1
|
Kala/01/2013
|
Construction of 668m long Pre-Stressed Girder Bridge with RCC Deck on Kalapara-Baliatali-Gangamati Road over Barobaliatali Andarmanik River under Kalapara Upazila, Patuakhali District.
|
Andermanik
|
kalapara
|
|
0.68
|
|
|
930000000.00
|
MAX-RANKEN (JV)
|
898385923.49
|
|
31/08/2016
|
30/06/2019
|
0
|
|
|
|
|
2
|
Kala-02/Andhermanik Bridge/Road/2015
|
Construction of Access Road & Structures of 668m long pre-stressed Girder Bridge over Baliatoli Andhermanik River on Kalapara - Baliatoli - Gangamoti Road at Kalapara Upazila under Patuakhali District.
|
Andermanik
|
kalapara
|
|
5.47
|
|
|
163109822.00
|
BB-MGU JV
|
0.00
|
|
|
|
0
|
|
|
|
|
3
|
W-PATUA-Kalapara-MC-17-12
|
Improvement of Chapli Wholesale Market & Collection Center (USAID ID: Y2MC004) at Kalapara, Patuakhali
|
BAIDP
|
kalapara
|
|
|
|
|
0.00
|
Md. Feroz, Fire Service road, Patuakhali
|
109.38
|
|
|
16/04/2019
|
10
|
|
|
10/03/2019
|
|
4
|
W-PATUA-Kalapara-VR-16-22
|
'Improvement of Dalutpur WAPDA - Pakhimara Bazar Road (USAID ID: Y2RD007,& LGED ID: 578665089) at ch: 0+000 - 4+525Km Total Length= 4.525 Km under Kalapara, Patuakhali
|
BAIDP
|
kalapara
|
|
4.53
|
|
|
0.00
|
M/s. Palli Stors, Town Kalikapur, Patuakhali
|
386.84
|
|
|
20/03/2019
|
28
|
|
|
10/03/2019
|
|
5
|
BDIRWSP/PAT/BAU/DW-21
|
Widening & Strengthening of Boga RHD-Baharchar GC road at Ch. 0.00-6600m including 04 Nos. 1.00mx1.00m RCC Box Culvert at Ch. 1140m, 2933m, 3600m & 4536m under Bauphal Upazila, District- Patuakhali. Road ID No: 578382002. Salvage Materials Cost Tk. 2517175.00
|
BDIRWSP
|
bauphal
|
578382002
|
6.60
|
|
|
1233.62
|
JAKAULLAH AND BROTHERS LIMITED Molla Tower, Thana Mour, Jibannagar, Chuadanga
|
1110.26
|
|
|
|
0
|
|
|
29/10/2024
|
|
6
|
BDIRWSP/PAT/BAU/DW-22
|
Widening & Strengthening of Boga RHD-Baharchar GC road at Ch. 6600-13285m including 02 Nos. 1.00mx1.00m RCC Box Culvert at Ch. 7353m, 12954m under Bauphal Upazila, District- Patuakhali. Road ID No: 578382002. Salvage Materials Cost Tk. 2239497.00
|
BDIRWSP
|
bauphal
|
578382002
|
6.69
|
|
|
1164.44
|
Md. Khairul Kabir Rana S.M.C Road Guptapara, Rangpur
|
1048.00
|
|
|
|
0
|
|
|
29/10/2024
|
|
7
|
BDIRWSP/PAT/GAL/DW-01
|
Widening & Strengthening of Ulania GC-Patabunia GC via Chiknikandi UP road at Ch. 10000-13400m including 01 No. 1.00mx1.00m RCC Box Culvert at 10660m and 01 No. 2-vent 4.00mx4.00m RCC Box Culvert at 11687m under Galachipa Upazila, District-Patuakhali. Road ID No: 578572006. Salvage Materials Cost Tk. 973000.00
|
BDIRWSP
|
galachipa
|
578572006
|
3.40
|
|
|
693.73
|
EFTE.ETCL (PVT.) LIMITED Horinpala, Bhandaria, Pirojpur
|
624.36
|
|
|
|
0
|
|
|
29/10/2024
|
|
8
|
BDIRWSP/PAT/GAL/DW-02
|
Widening & Strengthening of Ulania GC-Patabunia GC via Chiknikandi UP road at Ch. 13400-17416m under Galachipa Upazila, District-Patuakhali. Road ID No: 578572006. Salvage Materials Cost Tk. 1215790.00
|
BDIRWSP
|
galachipa
|
578572006
|
4.16
|
|
|
682.62
|
Mohammed Eunus & Brothers (Pvt.) Ltd. Nasirabad, Panchlaish, Chattogram City, Dist: Chattogram
|
614.36
|
|
|
|
0
|
|
|
29/10/2024
|
|
9
|
BDIRWSP/PAT/GAL/DW-03
|
Widening & Strengthening of Ulania GC-Patabunia GC via Chiknikandi UP road at Ch. 17416-21916m including 03 Nos. 1.00mx1.00m RCC Box Culvert at 19413m, 19988m & 21802m under Galachipa Upazila, District-Patuakhali. Road ID No: 578572006. Salvage Materials Cost Tk. 1346558.00
|
BDIRWSP
|
galachipa
|
578572006
|
4.50
|
|
|
835.21
|
Mohammed Eunus & Brothers (Pvt.) Ltd. Nasirabad, Panchlaish, Chattogram City, Dist: Chattogram
|
751.69
|
|
|
|
0
|
|
|
29/10/2024
|
|
10
|
BDIRWSP/PAT/KAL/DW-35
|
Widening & Strengthening of Boro Baliatali Hat- Latachapali UPC Via Gangamati, Kuakata, Khajura road at Ch. 6640-10140m under Kalapara Upazila, District-Patuakhali. Road ID No: 578663003
|
BDIRWSP
|
kalapara
|
578663003
|
3.50
|
|
|
749.84
|
Mohammed Eunus & Brothers (Pvt.) Ltd. Eunus Business Centre, Equity G.F. Fortune Mall (7th Fl.), 01 No. Baizid Bostami Road, Nasirabad, Panchlaish, Chattogram
|
674.85
|
|
|
|
0
|
|
|
30/01/2025
|
|
11
|
BDIRWSP/PAT/SAD/DW-04
|
Widening & Strengthening of Itbaria UPC-Shiali Bazer (RHD) road at Ch. 0.00-2770m under Sadar Upazila, District-Patuakhali. Road ID No: 578953023. Salvage Materials Cost Tk. 571088.00
|
BDIRWSP
|
patuakhali-s
|
578953023
|
2.77
|
|
|
461.37
|
Mohammed Eunus & Brothers (Pvt.) Ltd. Baizid Bostami Road, Nasirabad, Panchlaish, Chattogram
|
415.23
|
|
|
|
0
|
|
|
29/10/2024
|
|
12
|
BDIRWSP/PAT/SAD/DW-08
|
Widening & Strengthening of Kalikapur UP Bohalgachia Pakar Matha to Patuakhali Launch Ghat via 2 Nos Bundth Ghat & Puran bazer road at Ch. 0.00-1415m including 01 No. 2.00mx2.00m RCC Box Culvert at 450m under Sadar Upazila, District-Patuakhali. Road ID No: 578954418. Salvage Materials Cost Tk. 48048.00
|
BDIRWSP
|
patuakhali-s
|
578954418
|
1.42
|
|
|
426.79
|
Mohammed Eunus & Brothers (Pvt.) Ltd. Eunus Business Centre, Equity G.F. Fortune Mall (7th Fl.), 01 No. Baizid Bostami Road, Nasirabad, Panchlaish, Dist: Chattogram
|
384.11
|
|
|
|
0
|
|
|
29/10/2024
|
|
13
|
BDIRWSP/PAT/SAD/DW-05
|
Widening & Strengthening of Dharandi GC-Patabunia GC via Dewan sharif Darghga (Sadar Part) road at Ch. 0.00-1638m under Sadar Upazila, District-Patuakhali. Road ID No: 578952008. Salvage Materials Cost Tk. 299040.00
|
BDIRWSP
|
patuakhali-s
|
578952008
|
1.64
|
|
|
397.55
|
Mohammed Eunus & Brothers (Pvt.) Ltd. Eunus Business Centre, Equity G.F. Fortune Mall (7th Fl.), 01 No. Baizid Bostami Road, Nasirabad, Panchlaish, Dist: Chattogram
|
357.79
|
|
|
|
0
|
|
|
29/10/2024
|
|
14
|
BDIRWSP/PAT/SAD/DW-06
|
Widening & Strengthening of Dharandi GC-Patabunia GC via Dewan sharif Darghga (Sadar Part) road at Ch. 1638-3363m under Sadar Upazila, District-Patuakhali. Road ID No: 578952008.
|
BDIRWSP
|
patuakhali-s
|
578952008
|
1.73
|
|
|
481.98
|
Mohammed Eunus & Brothers (Pvt.) Ltd. Eunus Business Centre, Equity G.F. Fortune Mall (7th Fl.), 01 No. Baizid Bostami Road, Nasirabad, Panchlaish, Dist: Chattogram
|
433.78
|
|
|
|
0
|
|
|
29/10/2024
|
|
15
|
BDIRWSP/PAT/SAD/DW-07
|
Widening & Strengthening of Dharandi GC-Patabunia GC via Dewan sharif Darghga (Sadar Part) road at Ch. 3363-5552m including 02 Nos. 1.50mx1.50m RCC Box Culvert at 3874m & 4995m and 03 Nos. 2.00mx2.00m RCC Box Culvert at 3700m, 4680m & 5285m under Sadar Upazila, District-Patuakhali. Road ID No: 578952008. Salvage Materials Cost Tk. 451696.00
|
BDIRWSP
|
patuakhali-s
|
578952008
|
2.19
|
|
|
463.42
|
Mohammed Eunus & Brothers (Pvt.) Ltd. Eunus Business Centre, Equity G.F. Fortune Mall (7th Fl.), 01 No. Baizid Bostami Road, Nasirabad, Panchlaish, Dist: Chattogram
|
417.07
|
|
|
|
0
|
|
|
29/10/2024
|
|
16
|
BDIRWSP/PAT/SAD/DW-11
|
Widening & Strengthening of Patuakhali UZHQ (Al-Amin Madrasha) to Amkhola UPC via Shehakati Bazar & Purbo Badura Sr. Madrasha road at Ch. 2550-5110m under Sadar Upazila, District-Patuakhali. Road ID No: 578953047. Salvage Materials Cost Tk. 701372.00
|
BDIRWSP
|
patuakhali-s
|
578953047
|
2.56
|
|
|
421.61
|
Mohammed Eunus & Brothers (Pvt.) Ltd. Eunus Business Centre, Equity G.F. Fortune Mall (7th Fl.), 01 No. Baizid Bostami Road, Nasirabad, Panchlaish, Dist: Chattogram
|
379.44
|
|
|
|
0
|
|
|
29/10/2024
|
|
17
|
BDIRWSP/PAT/SAD/DW-10
|
Widening & Strengthening of Patuakhali UZHQ (Al-Amin Madrasha) to Amkhola UPC via Shehakati Bazar & Purbo Badura Sr. Madrasha road at Ch. 0.00-2550m under Sadar Upazila, District-Patuakhali. Road ID No: 578953047. Salvage Materials Cost Tk. 525840.00
|
BDIRWSP
|
patuakhali-s
|
578953047
|
2.55
|
|
|
397.34
|
EFTE.ETCL (PVT.) LIMITED Horinpala, Bhandaria, Pirojpur
|
357.61
|
|
|
|
0
|
|
|
29/10/2024
|
|
18
|
BDIRWSP/PAT/SAD/DW-12
|
Widening & Strengthening of RHD (Karmjatala)- Lohalia Bridge via Napit bari Pasurbunia GPS road at Ch. 0.00-1700m under Sadar Upazila, District-Patuakhali. Road ID No: 578954061. Salvage Materials Cost Tk. 368480.00
|
BDIRWSP
|
patuakhali-s
|
578954061
|
1.70
|
|
|
356.76
|
EFTE.ETCL (PVT.) LIMITED Horinpala, Bhandaria, Pirojpur
|
321.08
|
|
|
|
0
|
|
|
29/10/2024
|
|
19
|
BDIRWSP/PAT/SAD/DW-13
|
Widening & Strengthening of RHD (Karmjatala)- Lohalia Bridge via Napit bari Pasurbunia GPS road at Ch. 1700-3350m under Sadar Upazila, District-Patuakhali. Road ID No: 578954061.
|
BDIRWSP
|
patuakhali-s
|
578954061
|
1.65
|
|
|
370.93
|
Mohammed Eunus & Brothers (Pvt.) Ltd. Eunus Business Centre, Equity G.F. Fortune Mall (7th Fl.), 01 No. Baizid Bostami Road, Nasirabad, Panchlaish, Dist: Chattogram
|
333.83
|
|
|
|
0
|
|
|
29/10/2024
|
|
20
|
BDIRWSP/PAT/SAD/DW-14
|
Widening & Strengthening of RHD (Karmjatala)- Lohalia Bridge via Napit bari Pasurbunia GPS road at Ch. 3350-5000m under Sadar Upazila, District-Patuakhali. Road ID No: 578954061.
|
BDIRWSP
|
patuakhali-s
|
578954061
|
1.65
|
|
|
391.08
|
Mohammed Eunus & Brothers (Pvt.) Ltd. Eunus Business Centre, Equity G.F. Fortune Mall (7th Fl.), 01 No. Baizid Bostami Road, Nasirabad, Panchlaish, Dist: Chattogram
|
351.97
|
|
|
|
0
|
|
|
29/10/2024
|
|
21
|
BDIRWSP/PAT/SAD/DW-18
|
Widening & Strengthening of Patuakhali Lohalia Bridge to Patuakhali Sonali Bazer via Donaban GPS road at Ch. 3749-5793m under Sadar Upazila, District-Patuakhali. Road ID No: 578952010. Salvage Materials Cost Tk. 781256.00
|
BDIRWSP
|
patuakhali-s
|
578952010
|
2.44
|
|
|
429.65
|
Mohammed Eunus & Brothers (Pvt.) Ltd. Eunus Business Centre, Equity G.F. Fortune Mall (7th Fl.), 01 No. Baizid Bostami Road, Nasirabad, Panchlaish, Dist: Chattogram
|
386.69
|
|
|
|
0
|
|
|
29/10/2024
|
|
22
|
BDIRWSP/PAT/SAD/DW-19
|
Widening & Strengthening of Patuakhali Sadar UZHQ -Ayla GC via Bottolbunia & Khatashia GC (Sadar Part) road at Ch. 0.00-1355m under Sadar Upazila, District-Patuakhali. Road ID No: 578952004. Salvage Materials Cost Tk. 291872.00
|
BDIRWSP
|
patuakhali-s
|
578952004
|
1.36
|
|
|
296.03
|
EFTE.ETCL (PVT.) LIMITED Horinpala, Bhandaria, Pirojpur
|
266.43
|
|
|
|
0
|
|
|
29/10/2024
|
|
23
|
BDIRWSP/PAT/SAD/DW-15
|
Widening & Strengthening of RHD (Karmjatala)- Lohalia Bridge via Napit bari Pasurbunia GPS road at Ch. 5000-6985m under Sadar Upazila, District-Patuakhali. Road ID No: 578954061. Salvage Materials Cost Tk. 405916.00
|
BDIRWSP
|
patuakhali-s
|
578954061
|
1.99
|
|
|
464.00
|
EFTE.ETCL (PVT.) LIMITED Horinpala, Bhandaria, Pirojpur
|
417.60
|
|
|
|
0
|
|
|
29/10/2024
|
|
24
|
BDIRWSP/PAT/SAD/DW-16
|
Widening & Strengthening of Patuakhali Lohalia Bridge to Patuakhali Sonali Bazer via Donaban GPS road at Ch. 0.00-2028m (Effective Length=1452.00m) under Sadar Upazila, District-Patuakhali. Road ID No: 578952010. Salvage Materials Cost Tk. 174440.00
|
BDIRWSP
|
patuakhali-s
|
578952010
|
2.28
|
|
|
458.19
|
Mohammed Eunus & Brothers (Pvt.) Ltd. Eunus Business Centre, Equity G.F. Fortune Mall (7th Fl.), 01 No. Baizid Bostami Road, Nasirabad, Panchlaish, Dist: Chattogram
|
412.37
|
|
|
|
0
|
|
|
29/10/2024
|
|
25
|
BDIRWSP/PAT/SAD/DW-17
|
Widening & Strengthening of Patuakhali Lohalia Bridge to Patuakhali Sonali Bazer via Donaban GPS road at Ch. 2028-3749m under Sadar Upazila, District-Patuakhali. Road ID No: 578952010. Salvage Materials Cost Tk. 231280.00
|
BDIRWSP
|
patuakhali-s
|
578952010
|
1.72
|
|
|
462.84
|
EFTE.ETCL (PVT.) LIMITED Horinpala, Bhandaria, Pirojpur
|
416.55
|
|
|
|
0
|
|
|
29/10/2024
|
|
26
|
BDRIDP/ PAT/BAF/ CCA-RD/01
|
Improvement of Nawmala UP-Sabupura Bazar-Bauphal-Patuakhali RHD road (Kaderer Garage) by BC at ch.00-1000m.
|
BDRIDP
|
bauphal
|
|
1.00
|
|
|
43.85
|
M/S Kabir Traders.
|
38.73
|
|
|
|
100
|
|
|
|
|
27
|
BDRIDP/ PAT/BAF/ CCA-RD/02
|
Improvement of Kanakdia UP-Dipasha Bazar-Afsarer Garage-Sabupura Bazar- Nager hat road by BC at ch.0.0m-1000m under Bauphal Upazila.
|
BDRIDP
|
bauphal
|
|
1.00
|
|
|
50.28
|
M/S Tanvir Ahmed.
|
44.47
|
|
|
|
100
|
|
|
|
|
28
|
BDRIDP/ PAT/BAF/ CCA-Rd/03
|
Improvement of road from Daspara UP Norer road to Kalaiya-Hosnabad road by BC from ch.00-1150m.
|
BDRIDP
|
bauphal
|
|
1.15
|
|
|
45.54
|
M/S. K. K. Enterprise
|
43.79
|
|
29/04/2015
|
|
100
|
|
|
|
|
29
|
BDRIDP/ PAT/BAF/ CCA-Rd(R)/04
|
Rehabilitation of road from Madanpura UP (Kagojir Pool) Merdar hat-Chandrapara-Chowrasta Bazar (Dhali Asia Khatun Madrasha) Madanpura Union road by BC from ch.00-1900m.
|
BDRIDP
|
bauphal
|
|
1.90
|
|
|
95.03
|
M/S. K. K. Enterprise
|
92.01
|
|
29/04/2015
|
|
100
|
|
|
|
|
30
|
BDRIDP/ PAT/BAF/ CCA-Rd/05
|
Rehab. Of road from North Soula GPS cum Cyclone Shelter-South Soula GPS cum Cyclone Shelter (UZR Iman Ali Howlader Mosque to Baharampur-WAPDA very Bunth road by BC from ch.1000-2650m
|
BDRIDP
|
bauphal
|
|
1.65
|
|
|
66.05
|
M/S. Tushar Enterprise
|
55.14
|
|
|
|
100
|
|
|
|
|
31
|
BDRIDP/ PAT/BAF/ CCA-Rd(R)/06
|
Rehab. Of road from North Soula GPS cum Cyclone Shelter-South Soula GPS cum Cyclone Shelter (UZR Iman Ali Howlader Mosque to Baharampur-WAPDA very Bunth road by BC from ch.2650m-3460m
|
BDRIDP
|
bauphal
|
|
0.81
|
|
|
32.23
|
M/S. Tushar Enterprise
|
26.90
|
|
|
|
50
|
|
|
|
|
32
|
BDRIDP/ PAT/BAF/ UN-RD/01
|
Improvement of Chanropara Chowrasta- Tentulia River road by BC at ch.0.0m-1000m & Const. of 01 No U-Drain at ch.18m under Bauphal Upazila.
|
BDRIDP
|
bauphal
|
|
1.00
|
|
|
59.65
|
M/S Khandakar Brothers.
|
51.15
|
|
|
|
100
|
|
|
|
|
33
|
BDRIDP/ PAT/BAF/ UN-Rd/02
|
Improvement of road from Kalisuri UP (Kumarkhali Bridge)-Kanakdia Bazar (Kalisuri UP-Shibpur Hazar-Sattar Fakir House-Shibpur Satalight School road) by BC from ch.00-1750m
|
BDRIDP
|
bauphal
|
|
1.75
|
|
|
96.71
|
M/S. Y.A Khan
|
78.00
|
|
|
|
100
|
|
|
|
|
34
|
BDRIDP/ PAT/BAF/ UN-Rd/03
|
Imp. Of road from Daspara UP-Char Alogi GPS-Moishadi Bazar road by BC from ch.1500-2500m
|
BDRIDP
|
bauphal
|
|
1.00
|
|
|
55.58
|
M/S. K. K. Enterprise
|
55.13
|
|
|
|
100
|
|
|
|
|
35
|
BDRIDP/ PAT/BAF/ UN-Rd/04
|
Imp. Of road from Kanakdia UP Baultali Bazar- Jhilna Bazar road by BC from 3500m-5100m
|
BDRIDP
|
bauphal
|
|
1.60
|
|
|
87.42
|
M/S. Y.A Khan
|
71.69
|
|
|
|
100
|
|
|
|
|
36
|
BDRIDP/ PAT/BAF/ CCA-Rd/08
|
Improvement of road from East Side of Dr. Shahalom Talukder House Jame Mosque-Nogorer Hat Yuasub Member House via Nowmala High School road by BC from Ch. 00-510m (ID No. 578384274) under Bauphal, Patuakhali.
|
BDRIDP
|
bauphal
|
|
0.51
|
|
|
32.59
|
Dr. A. Khaleq Bishwas
|
25.53
|
|
|
|
50
|
|
|
|
|
37
|
BDRIDP/ PAT/BAF/ CCA-Rd/09
|
Improvement of road from Shabupura Tulatola Bor Sikder Bari-Dasher Howla UZR Connecting road by BC from Ch. 2750-4100m with 02(Two) Nos. U-Drain at Ch. 2860m & 3275m (ID No. 578385057) under Bauphal, Patuakhali.
|
BDRIDP
|
bauphal
|
|
1.35
|
|
|
77.27
|
Md. Akhtaruzzaman
|
68.77
|
|
|
|
50
|
|
|
|
|
38
|
BDRIDP/PAT/BAF/CCA-Rd/07
|
Improvement of road from Jamalkhati road-Oytizobahi Dighir Ghat & Kobor Stan via Advocate Nazrul Islam House road by CC work from Ch. 00-100m under Bauphal, Patuakhali.
|
BDRIDP
|
bauphal
|
|
0.10
|
|
|
3.14
|
M/S. Munia Enterprise
|
1.87
|
|
|
|
100
|
|
|
|
|
39
|
BDRIDP/PAT/BAF/CCA-Rd(R)/10
|
Rehabilitation of road from Bauphal UPC (Sher-E-Bangla Road)-Naomala BDC Bazar Road via Olipura Bazar East Side (Bilbilash Miah Bari Mr. M. K Raman's House) road By BC from Ch. 00-300m (ID No.578383021)
|
BDRIDP
|
bauphal
|
|
0.30
|
|
|
17.60
|
Md. Azaher Uddin
|
14.98
|
|
|
|
100
|
|
|
|
|
40
|
BDRIDP/PAT/BAF/UN-Rd/05
|
Improvement of Road from Kalisuri UPC Kumarkhali Bridge-Nurainpur Bazar via Kanakdia Bazar by BC at Ch. 1750m-2750m and including 3 Nos 1.60mX1.60m RCC Box Culvert at Ch. 1945.00m 2260.00m & 2530.00m ID No 578383001
|
BDRIDP
|
bauphal
|
|
1.00
|
|
|
67.04
|
Md. Firoz
|
60.34
|
|
|
|
100
|
|
|
|
|
41
|
BDRIDP/PAT/BAF/CCA-Rd/11
|
Improvement of Road from Karkhana Lanch Ghat -Karkhana Manik Gazi Bari (Karkhana High School West side of Fouekan Munsi Shop to Karkhana Senior Madrasha via previous Poura Chairmain Abdul Haque Mia Bari & Karkhana Lunch Ghat From Ch.0.00m-550.00m By HBB i
|
BDRIDP
|
bauphal
|
|
0.55
|
|
|
0.00
|
|
0.00
|
|
|
|
0
|
|
|
|
|
42
|
BDRIDP/PAT/BAF/CCA-Rd/12
|
Improvement of road from Mominpur Biswas Bari-Saber Howlader Bari- Sikder Bazar road from Ch. 600.00-1600.00m including 1No. 1.00mx1.00m RCC Box Culvert at Ch. 1510.00m & 2 Nos. U-drain at Ch. 785.00m & 915.00 ( ID No. 578385150)
|
BDRIDP
|
bauphal
|
|
1.00
|
|
|
65.18
|
Md. Khair Hossain
|
67.81
|
|
|
|
40
|
|
|
|
|
43
|
BDRIDP/PAT/BAF/CCA-Rd/13
|
Improvement of road From Kalishuri-Chandkati H/School Kasobpur Bazar by BC at Ch. 1000m-1770m including 01 Nos. 1.00mx1.00m RCC Box Culvert at ch. 1175m & 1 No. U-Drain at Ch. 1308m. (ID No. 578384033)
|
BDRIDP
|
bauphal
|
|
0.77
|
|
|
60.47
|
M/S. Islam Brothers
|
54.42
|
|
|
|
60
|
|
|
|
|
44
|
BDRIDP/PAT/BAF/CCA-Rd/14
|
Improvement of road From Kanakdia Kachipara (Bader hat) - Hisbullah Bazar (Mohosin Sepahi Bari) by BC at Ch. 00m-1500m including 03 Nos. 1.00mx1.00m RCC Box Culvert at ch. 437m, 732m & 831m and 04 Nos U-Drain at Ch. 250m, 510m, 1221m, 1450m. (ID No. 57838
|
BDRIDP
|
bauphal
|
|
1.50
|
|
|
109.40
|
M/S. Mohiuddin Ahmed
|
102.74
|
|
|
|
25
|
|
|
|
|
45
|
BDRIDP/PAT/BAF/CCA-Rd/15
|
Improvement of road From gonsinga (RHD) - Rasidea Madrasha - Bilbilash Molla Bari Bridge by BC at Ch. 00m-1215m including 02 Nos. 1.00mx1.00m RCC Box Culvert at ch. 20m, 676m and 03 Nos U-Drain at Ch. 145m, 380m, 1155m. (ID No. 578384103)
|
BDRIDP
|
bauphal
|
|
1.22
|
|
|
87.98
|
M/S. Najmus Shahadat Traders
|
87.88
|
|
|
|
15
|
|
|
|
|
46
|
BDRIDP/PAT/BAF/CCA-Rd/16
|
Improvement of road From Uttar Modonpura Islamia Dakhil Madrasha - Daroga bari -via golam Mostafa Chairman House by BC at Ch. 2000m-3680m including 01 No. 2.00mx2.00m & 01 No. 1.00mx1.00m RCC Box Culvert at ch. 750m and 3660m. (ID No. 578384223) (Salvage
|
BDRIDP
|
bauphal
|
|
1.68
|
|
|
113.06
|
M/S. Tanvir Ahmed
|
109.51
|
|
|
|
0
|
|
|
|
|
47
|
BDRIDP/PAT/BAF/CCA-Rd/17
|
Improvement of road From Madonpura Kanakdia UNr road (Shader bari Jame Mosque) -Kanakdia UPC - Chandrapara Bazar UNR Road connecting via Engr. Atikur Rahman House by BC at Ch. 500m-2110m including 02 Nos. 1.00mx1.00m RCC Box Culvert at Ch. 745m, 1325m & 0
|
BDRIDP
|
bauphal
|
|
1.61
|
|
|
105.89
|
M/S. K. K. Enterprise
|
104.91
|
|
|
|
60
|
|
|
|
|
48
|
BDRIDP/PAT/BAF/CCA-Rd/18
|
Improvement of road From Boga Sabupura BC road to Sabupura GPS Via Sabupura Mother & Child Hospital by BC at Ch. 950m-1678m including 01 No. 1.00mx1.00m RCC Box Culvert at Ch. 1165m. (ID No. 578384352)
|
BDRIDP
|
bauphal
|
|
0.73
|
|
|
0.00
|
|
0.00
|
|
|
|
0
|
|
|
|
|
49
|
BDRIDP/PAT/BAF/CCA-Rd/19
|
Improvement of road From Boga UP Chairman Ahmmed Hpuse Mosque to Sabupura GPS - North side of Serjen Ali Mridha House by BC at Ch. 810m-1200m including 01 No. 2.00mx2.00m RCC Box Culvert at Ch. 1140m. (ID No. 578385103)
|
BDRIDP
|
bauphal
|
|
0.39
|
|
|
0.00
|
|
0.00
|
|
|
|
0
|
|
|
|
|
50
|
BDRIDP/PAT/BAF/UN-Rd/06
|
Improvement of Road from Daspara UPC Moishadi Bazar via Char Alogi GPS Road by BC at Ch. 850m-1500m & 2500m-2850m including 01 No 3.00mX3.00m RCC Box Culvert at Ch. 2050m (ID No. 578383044) (Salvage: BDT: 1432898.00)
|
BDRIDP
|
bauphal
|
|
0.65
|
|
|
73.94
|
|
0.00
|
|
|
|
0
|
|
|
|
|
51
|
BDRIDP/ PAT/BAF/ UN-St/01
|
Const. of 02 Nos (1.60mX1.60) RCC Box Culvert on the road from Chanropara Chowrasta Tentulia River road at ch.1360m & 2030m.
|
BDRIDP
|
bauphal
|
|
|
|
|
6.07
|
M/S Khandakar Brothers.
|
4.71
|
|
|
|
100
|
|
|
|
|
52
|
BDRIDP/ PAT/BAF/ UN-St/02
|
Const. of 1 No. 1.60mX1.60m Box culvert and 1No U-Drain Kalisuri UP (Kumarkhali Bridge)-Kanakdia Bazar-Nurainpur Bazar (Kalisuri UP-Shibpur Hazar-Sattar Fakir House-Shibpur Satalight school road) at ch.1100m & 1650m.
|
BDRIDP
|
bauphal
|
|
|
|
|
3.96
|
M/S. K. K. Enterprise
|
3.72
|
|
|
|
100
|
|
|
|
|
53
|
BDRIDP/ PAT/BAF/ UN-St/03
|
Const. of road from 3 Nos 1.60mx1.60m Box culvert on Kanakdia UP Baultali Bazar-Jhilna Bazar road at ch.313m, 815m & 1153m.
|
BDRIDP
|
bauphal
|
|
|
|
|
9.62
|
Suresh Chandra Bishwas
|
7.50
|
|
|
|
100
|
|
|
|
|
54
|
BDRIDP/ PAT/BAF/ CCA-St/01
|
Const.of road from 1No 1.60mX1.60m Box Culvert and 1 No U-Drain on Daspara UP Norer road to Kalaiya-Hosnabad road at ch.750m & 1095m
|
BDRIDP
|
bauphal
|
|
|
|
|
3.96
|
M/S. K. K. Enterprise
|
3.73
|
|
|
|
100
|
|
|
|
|
55
|
BDRIDP/ PAT/BAF/ CCA-St/02
|
Const. of road from 3 Nos 1.60mX1.60m Box culvert and 1No U-Drain on Madanpura UP (Kagojir Pool) Merdar hat-Chandrapara-Chowrasta bazar (Dhali Asia Khatun Madrasha) Union road at ch.235m, 1205m, 1620m & 944m.
|
BDRIDP
|
bauphal
|
|
|
|
|
9.50
|
M/S. Auditi Enterprise
|
7.65
|
|
|
|
100
|
|
|
|
|
56
|
BDRIDP/ PAT/BAF/ CCA-St/03
|
Const. of 1No 1.60mx1.60m Box culvert & 1No U-Drain on North Soula GPS cum cyclone shelter-South Soula GPS cum Cyclone shelter (UZR Iman Ali Howlader Mosque to Baharampur-WAPDA very Bunth) road at ch.2202m & 2112m
|
BDRIDP
|
bauphal
|
|
|
|
|
3.96
|
M/S. Munia Enterprise
|
3.01
|
|
|
|
100
|
|
|
|
|
57
|
BDRIDP/PAT/BAF/UZ-St/01
|
Construction of 20.00m RCC Girder Bridge on Boga Bauphal RHD (Shaplakhali) to Kalisuri GC via Kanakdia Hat Road at Ch. 12+290km (Road ID No. 578382004)
|
BDRIDP
|
bauphal
|
|
|
|
|
150.35
|
M.M. Builders & Engineers Ltd.
|
135.32
|
|
|
|
40
|
|
|
|
|
58
|
BDRIDP/PAT/BAF/UZ-St/02
|
Construction of 20.00m RCC Girder Bridge on Mominpur GC - Baherchar GC via Kalisuri GC Road at Ch. 13+680km (Road ID No. 578382005)
|
BDRIDP
|
bauphal
|
|
|
|
|
164.89
|
M.M. Builders & Engineers Ltd.
|
148.40
|
|
|
|
40
|
|
|
|
|
59
|
BDRIDP/PAT/BAF/UZ-St/03
|
Construction of 15.00m RCC Girder Bridge on Boga Bauphal RHD (Shaplakhali) to Kalisuri GC via Kanakdia Hat Road at Ch. 14+990km (Road ID No. 578382004)
|
BDRIDP
|
bauphal
|
|
|
|
|
124.78
|
M.M. Builders & Engineers Ltd.
|
112.30
|
|
|
|
30
|
|
|
|
|
60
|
BDRIDP/PAT/BAF/UZ-St/04
|
Construction of 15.00m RCC Girder Bridge on Boga Bauphal RHD (Shaplakhali) to Kalisuri GC via Kanakdia Hat Road at Ch. 15+980km (Road ID No. 578382004)
|
BDRIDP
|
bauphal
|
|
|
|
|
124.07
|
M.M. Builders & Engineers Ltd.
|
111.66
|
|
|
|
30
|
|
|
|
|
61
|
BDRIDP/PAT/BAF/CCA-Rd/20
|
Improvement o Road from Alogi River-Sultanabad Bazar-Dandi GPS Road By BC at ch. 00.00m-1860.00m including 01 No 1.00mx1.00m, 01 No 3.00mx3.00m RCC Box Culvert at Ch. 1036.00m, 1860.00m & 2Nos U- Drain at Ch 1248.00m, 1570.00m. (ID No. 578384123)
|
BDRIDP
|
bauphal
|
|
1.86
|
|
|
0.00
|
|
0.00
|
|
|
|
0
|
|
|
|
|
62
|
BDRIDP/PAT/GAL/UZ-Rd/01
|
Improvement of road from Kalagachia GC-Patabunia GC (Kharizzama-Bazar UZR-Patabunia GC) Road by BC at Ch. 0.00-2000 m (Old ID no: 578572003),(New ID no: 578574201)
|
BDRIDP
|
dashmina
|
|
2.00
|
|
|
114.10
|
Shafiqur Rahman
|
91.83
|
|
|
|
100
|
|
|
|
|
63
|
BDRIDP/PAT/GAL/UZ-Rd/02
|
Improvement of road from Badura GC- Gazipur Gc ( Badhura GC-Julakha Bazar RHD) road by BC at Ch. 200-3200m (ID no. 578572005) (Salvage: BDT: 26,85,106.00)
|
BDRIDP
|
dashmina
|
|
3.00
|
|
|
213.46
|
Md. Firoz
|
170.00
|
|
|
|
85
|
|
|
|
|
64
|
BDRIDP/PAT/GAL/UZ-Rd/03
|
Improvement of Kalagachia GC-Patabunia GC Kharizzama Bazar UZR-Patabunia GC road by BC from ch.2000.00m-4000.00m. ID No. Old 578572003 New 578574201 Salvage Cost Tk. 434417.00
|
BDRIDP
|
dashmina
|
|
2.00
|
|
|
130.44
|
Shafiqur Rahman
|
117.40
|
|
|
|
100
|
|
|
|
|
65
|
BDRIDP/PAT/GAL/UZ-Rd/04
|
Improvement of Badura GC-Gazipur GC Badura GC - Julakha Bazar RHD road by BC from ch. 5200.00m-7750.00m including 3 Nos 2.00mx2.00m RCC Box Culvert at ch. 6260m 6470m & 7070m. ID No. 578572005
|
BDRIDP
|
dashmina
|
|
2.55
|
|
|
205.67
|
Md. Firoz & Abdul Satter Howlader (JV)
|
187.05
|
|
|
|
50
|
|
|
|
|
66
|
BDRIDP/PAT/GAL/CCA-Rd/01
|
Improvement of road by bothside Widening by Bitumenous Carpeting from Chottosiba UZR-Barosiba Launch Ghat (Ferry Ghat Road) at Ch. 1700m-3905m & 6300m-7100m including 01 No 1.50mX1.50m RCC Box Culvert at Ch. 3850m (ID No. 578574209)
|
BDRIDP
|
dashmina
|
|
2.21
|
|
|
180.36
|
M/S. Palli Stors
|
169.66
|
|
|
|
0
|
|
|
|
|
67
|
BDRIDP/PAT/GAL/UZ-St/01
|
Construction of 4.00mX4.00m 2-Vent RCC Box Culvert on Badura GC-Gazipur GC (Badura GC-Julakha Bazar RHD) Road At Ch. 3240.00m (ID No: 578572005)
|
BDRIDP
|
dashmina
|
|
|
|
|
29.15
|
M/S. Talukder Enterprise
|
20.99
|
|
|
|
0
|
|
|
|
|
68
|
BDRIDP/PAT/GAL/UZ-St/02
|
Construction of 42.06m RCC Girder Bridge on Badura GC-Julakha Bazar RHD Road at Ch. 11283m, [Road ID: 578572005]
|
BDRIDP
|
dashmina
|
|
|
|
|
268.59
|
M/S. Amir Engineering Corporation-M.M. Builders & Engineers Ltd.-M/S. Niaz Traders-JV
|
241.73
|
|
|
|
10
|
|
|
|
|
69
|
BDRIDP/ PAT/DUM/ CCA-Rd/01
|
Improvement of road from Angaria (RHD Baherchar Ferry Ghat Janab Rubul Amin Howlader Honarable MP)-Old Patabunia Bazar road by BC from ch.00-600m.
|
BDRIDP
|
dumki
|
|
0.60
|
|
|
28.76
|
M/S. K. K. Enterprise
|
28.55
|
|
|
|
100
|
|
|
|
|
70
|
BDRIDP/ PAT/DUM/ CCA-Rd(R)/02
|
Rehabilitation of road from Angaria (RHD Baherchar Ferry ghat Janab Ruhul Amin Howlader Honorable MP)-Clinic road by BC from ch.00-258m.
|
BDRIDP
|
dumki
|
|
0.26
|
|
|
12.74
|
M/S. K. K. Enterprise
|
12.43
|
|
|
|
100
|
|
|
|
|
71
|
BDRIDP/PAT/DUM/CCA-Rd/03
|
Improvement of Utter Muradia Cyclone Shelter connecting road under Dumki Upazila. (Ch. 0.00-400.00m) (Salvage amount Tk. 264289.00 (Fixed))
|
BDRIDP
|
dumki
|
|
0.40
|
|
|
23.80
|
M/S. Melanium Traders
|
18.39
|
|
|
|
100
|
|
|
|
|
72
|
BDRIDP/PAT/DUM/CCA-Rd/04
|
Improvement of Dumki Satani GPS cum Cyclone Shelter connecting road.. (Ch. 0.00-450.00m) (Salvage amount Tk. 196726.00 (Fixed))
|
BDRIDP
|
dumki
|
|
0.45
|
|
|
25.58
|
M/S. Melanium Traders
|
19.83
|
|
|
|
100
|
|
|
|
|
73
|
BDRIDP/PAT/DUM/CCA-Rd/05
|
Improvement of Muradia Santos Member Bari-Uttar Wapda Verry Bandh via Razzak Pada House Road by BC at Ch. 00m-850m & Link Road Ch. 00m-150m Including 2 nos 1.00mX1.00m RCC Box Culvert at Ch. 343.00m & 750.00m ID No. 578964123 Salvage Cost BDT219430.00
|
BDRIDP
|
dumki
|
|
0.85
|
|
|
63.74
|
Lutfa Construction
|
57.37
|
|
|
|
50
|
|
|
|
|
74
|
BDRIDP/PAT/DUM/UZ-Rd/01
|
Improvement of road from Muradia UP-Laukathi UP via South Khali GPS & Bhoktobari A Salam Doctor Abari via Mozumder Hat road by BC at Ch.0.00m-2000.00m Old ID No- 578962003 New ID No. 578964015
|
BDRIDP
|
dumki
|
|
2.00
|
|
|
111.80
|
M/S. Amir Engineering Corporation
|
100.62
|
|
|
|
65
|
|
|
|
|
75
|
BDRIDP/PAT/DUM/CCA-Rd/06
|
Improvement of road from Labukhali-Boga RHD Chorgorobdi Free Ghat-Amir Hossain Howlader Bazar launch Ghat via A. Kashem High School by BC at Ch.0.00.m-2000.00m Including 3 Nos 1.50m x 1.50m RCC Box Culvert at Ch. 1458.00m 1798.00m & 1918.00m Old ID No-578
|
BDRIDP
|
dumki
|
|
2.00
|
|
|
139.80
|
Md. Enayet Hossain
|
125.82
|
|
|
|
100
|
|
|
|
|
76
|
BDRIDP/PAT/DUM/CCA-Rd/07
|
Improvement of road from Jamla Bazar-Kalbari Bazar Gabtali Bazar-Sreerampur Dakatia Khalgora via Talukder Hat road by BC at Ch.0.00m-1000.00m ID No-578964135
|
BDRIDP
|
dumki
|
|
1.00
|
|
|
58.36
|
M/S. Niaz Traders
|
52.52
|
|
|
|
35
|
|
|
|
|
77
|
BDRIDP/PAT/DUM/CCA-Rd/08
|
Improvement of road from Board Office Bridge-Gabtoli Bazar via H/O Salam Mridha West side of Bridge- Gabtoli Hat via Salampur Fazil Madrasha by BC at CH.0.00m-1000.00m ID No-578964041
|
BDRIDP
|
dumki
|
|
1.00
|
|
|
59.95
|
M/S. Niaz Traders
|
53.95
|
|
|
|
65
|
|
|
|
|
78
|
BDRIDP/PAT/DUM/CCA-Rd/09
|
Improvement of road from Labukhali Bauphal RHD Taltali Chowrasta-Char Boyra High School road by BC at Ch.0.00m-500.00m Including 1 No 1.00 x 1.00m RCC Box Culvert at Ch. 135.00m ID No-578964047Salvage Cost 349064.00
|
BDRIDP
|
dumki
|
|
0.50
|
|
|
34.81
|
M/S. Niaz Traders
|
31.33
|
|
|
|
42
|
|
|
|
|
79
|
BDRIDP/PAT/DUM/CCA-Rd/10
|
Improvement of road from Atharogachia Mojibor Sikder Bari-Karthikpasha UZR road by BC at Ch.0.00m-1000.00m Including 1 No 4.00m x 4.00m 2 Nos 1.00m x 1.00m RCC Box Culvert at Ch. 536.00m 155.00m & 900.00m ID No-578964155
|
BDRIDP
|
dumki
|
|
1.00
|
|
|
84.01
|
M/S. Niaz Traders
|
75.61
|
|
|
|
15
|
|
|
|
|
80
|
BDRIDP/PAT/DUM/CCA-Rd/11
|
Improvement of road from Pangasi Noldoani High School & GPS - H/O Jennta Ali Gazi Mosque road by BC at Ch.0.00m-1000.00m Including 1 No 1.50m x 1.50m RCC Box Culvert at Ch. 476.00m ID No-578965071
|
BDRIDP
|
dumki
|
|
1.00
|
|
|
61.12
|
M/S. Niaz Traders
|
55.01
|
|
|
|
20
|
|
|
|
|
81
|
BDRIDP/PAT/DUM/CCA-Rd/12
|
Improvement of Road from United Mohila College-Wazed Ali Howlader Jum-E-Mosque (Uttar Sreerampur H/S, GPS-Rajakhali Bazar at Ch. 00m-414m by BC & Ch. 414m-1000m by HBB including 3 Nos 1.00mx1.00m RCC Box Culvert at Ch. 4.00m, 330.00m & 842.00m (ID No. 578
|
BDRIDP
|
dumki
|
|
0.41
|
|
|
63.48
|
M/S. Md. Delowar Hossain
|
60.31
|
|
|
|
0
|
|
|
|
|
82
|
BDRIDP/PAT/KAL/UN-Rd/01
|
Improvement of road from Kalapara-Teakhali Bazar-Madhaya Teakhali Ghat bazar road by BC form ch. 5050-7300m with 3 Nos U-Drain at Ch. 6430m, 6573m & 6950m under Kalapara, Patuakhali.
|
BDRIDP
|
kalapara
|
|
2.25
|
|
|
129.03
|
Md. Bashir Uddin
|
112.88
|
|
|
|
100
|
|
|
|
|
83
|
BDRIDP/PAT/KAL/CCA-Rd/01
|
Improvement of road by 25mm dense Carpeting on Omedpur GPS cum Cyclone Shelter road from ch. 0.00m-1500.00m with 01 No. U-Drain (0.600mx0.600m) at ch. 720.00m
|
BDRIDP
|
kalapara
|
|
1.50
|
|
|
89.57
|
M/S. Yousuf Ali
|
78.92
|
|
|
|
100
|
|
|
|
|
84
|
BDRIDP/PAT/KAL/GC/01
|
Improvement of Alipur Bazar at Latachapli Union, Kalapara, Patuakhali.
|
BDRIDP
|
kalapara
|
|
|
|
|
50.93
|
S. Ananta Bikash Tripura
|
45.84
|
|
|
|
10
|
|
|
|
|
85
|
BDRIDP/PAT/MIR/UZ-Rd/02
|
Improvement of road from Voyang GC - Ayla GC (Habib Bazar) by BC from Ch. 1850.00m-2850.00m. (ID No. 578762007)
|
BDRIDP
|
mirjaganj
|
|
1.00
|
|
|
69.42
|
Sayed Md. Sohel
|
60.70
|
|
|
|
55
|
|
|
|
|
86
|
BDRIDP/PAT/MIR/UZ-Rd(R)/01
|
Rehabilitation of road from Voyang GC-Ayla GC (Habib Bazar) by BC from Ch. 0.00m-1850.00m including 3 nos. 2.00mx2.00m RCC Box Culvert at Ch. 509m, 1248m & 1641m. (Salvage Cost: Tk. 3056224.00) (ID No. 578762007)
|
BDRIDP
|
mirjaganj
|
|
1.85
|
|
|
154.19
|
Kinnary Construction
|
125.09
|
|
|
|
100
|
|
|
|
|
87
|
BDRIDP/PAT/MIR/CCA-Rd/02
|
Improvement of Road from UZR near Charkhali GPS at Deuly Bererdon River (Chatra GPS) by BC from Ch. 0.00m-1450.00m. (ID No. 578765080)
|
BDRIDP
|
mirjaganj
|
|
1.45
|
|
|
80.39
|
Kinnary Construction
|
67.42
|
|
|
|
30
|
|
|
|
|
88
|
BDRIDP/PAT/MIR/CCA-St/01
|
Construction of 9.15m OFC bridge on UZR near Chairkhali GPS at Deuly UP - Barrardone River (Chatra GPS) road at Ch:0.00m (Road ID No. 578765080)
|
BDRIDP
|
mirjaganj
|
|
|
|
|
25.50
|
M/S. Soma Enterprise
|
19.51
|
|
|
|
100
|
|
|
|
|
89
|
BDRIDP/PAT/MIR/UZ-St/01
|
Construction of 21.00m long RCC Girder Bridge on Voyang GC-Ayola GC (Habib Bazar) Road at Ch. 3858m. (ID No-578762007)
|
BDRIDP
|
mirjaganj
|
|
|
|
|
148.44
|
M/S. Sikder Enterprise (Moyazzem)
|
141.02
|
|
|
|
0
|
|
|
|
|
90
|
BDRIDP/PAT/MIR/CCA-Rd/03
|
Improvement of Road from R&H at East Bazita Club-H/O Bazlu Bayati-Munshirhat Road by BC at Ch. 00m-1000m including 02 Nos 1.50mx1.50m & 01 No 4.00mx3.50m RCC Box Culvert at Ch. 450m, 624m & 90m under Mirjagonj, Patuakhali. (ID No. 578764049)
|
BDRIDP
|
mirjaganj
|
|
1.00
|
|
|
99.91
|
M/S. Md. Delowar Hossain
|
94.92
|
|
|
|
0
|
|
|
|
|
91
|
BDRIDP/PAT/MIR/CCA-Rd/04
|
Improvement of Road from Labubunia H/O Wazed Khan-Talukder Bari-H/O Nurmohammad Road by BC at Ch. 00m-1000m including 02 Nos 1.50mx1.50m & 01 No. 4.00mx3.50m RCC Box Culvert at Ch. 183m, 450m & 710m under Mirjagonj, Patuakhali. (ID No. 578765056)
|
BDRIDP
|
mirjaganj
|
|
1.00
|
|
|
96.36
|
M/S. Gazi Construction (Ahsan)
|
91.54
|
|
|
|
0
|
|
|
|
|
92
|
BDRIDP/PAT/MIR/CCA-Rd/05
|
Improvement of Road from RHD at Humraibunia UZR Saylabunia road via south Jatibunia GPS-H/Q Kader Sikder Road by BC at Ch. 660m-1920m including 03 Nos 1.50mx1.50m & 01 No 2.00mx2.00m RCC Box Culvert at Ch. 77m, 171m 480m & 708m (ID No. 578765012) under Mi
|
BDRIDP
|
mirjaganj
|
|
1.26
|
|
|
103.37
|
M/S. Jannatul Ferdous Traders
|
100.03
|
|
|
|
15
|
|
|
|
|
93
|
BDRIDP/ PAT/SAD/ CCA-Rd/01
|
Imp. Of road from Moukaran UNR road start Purbo Talikhali Mazibar dokan-North side Kafulabunia khal-Daritaluk P/S & H/S road via Abdul Latif Howlader bari road by HBB from ch.00-1500m.
|
BDRIDP
|
patuakhali-s
|
|
1.50
|
|
|
35.00
|
Md. Shafiqur Rahman
|
30.80
|
|
|
|
100
|
|
|
|
|
94
|
BDRIDP/ PAT/SDR/ CCA-RD/02
|
Improvement of road from Pangashia UP-Gazipur R&H (Bus Stand)-Jamla road upto Sreerampur Sluice Gate road by BC from ch.4228-5724m
|
BDRIDP
|
patuakhali-s
|
|
1.50
|
|
|
76.41
|
M/S. Selim Stores
|
71.83
|
|
|
|
100
|
|
|
|
|
95
|
BDRIDP/ PAT/SAD/ CCA-Rd/03
|
Imp. Of road from Low Kathi Officer hat to Kaler hat via Kismat Moukarn Primary School road by BC from ch.1400-3116m
|
BDRIDP
|
patuakhali-s
|
|
1.72
|
|
|
79.96
|
Md. Jasim Uddin Khan
|
71.84
|
|
|
|
100
|
|
|
|
|
96
|
BDRIDP/ PAT/SAD/ CCA-Rd/04
|
Imp. Of road from Moukaran UZR road via Jabber Sikder bari via Fakir Bari-Rashid Kazi Bari via Muktijodda Yousuf Kazi bari-Moukarn Bazar Gazipur road by HBB from ch.00-1215m
|
BDRIDP
|
patuakhali-s
|
|
1.22
|
|
|
34.64
|
M/S. Hima Bricks
|
29.81
|
|
|
|
100
|
|
|
|
|
97
|
BDRIDP/PAT/SAD/CCA-Rd/07
|
Improvement of road from Showla Baily Bridge-Full Sharif Bazar via Mazi Bari-pachim Vaila Madrasha-Vaila RNGPS road By HBB from Ch.3000-4200m with 1 No U-Drain (625mmx625mm) at Ch.4200m (ID No. 578954111)
|
BDRIDP
|
patuakhali-s
|
|
1.20
|
|
|
40.09
|
M/S. Hima Bricks
|
39.97
|
|
|
|
100
|
|
|
|
|
98
|
BDRIDP/PAT/SAD/CCA-Rd/05
|
Improvement of road from Jainkati UP-Bhuria Bazar UNR to Pathan Bari Mosque via Abdul Malek Mredha Bari by HBB form ch. 00-550m (ID No. 578955341)
|
BDRIDP
|
patuakhali-s
|
|
0.55
|
|
|
11.06
|
M/S. Hima Bricks
|
10.12
|
|
|
|
100
|
|
|
|
|
99
|
BDRIDP/PAT/SAD/CCA-Rd/06
|
Improvement of road from Islampur Madrasha to BWDB Embankment via Rafiqul Islam Moulana Bari by HBB form ch. 00-600m (ID No. 578955342)
|
BDRIDP
|
patuakhali-s
|
|
0.60
|
|
|
14.75
|
M/S. Hima Bricks
|
12.69
|
|
|
|
100
|
|
|
|
|
100
|
BDRIDP/ PAT/SAD/ UN-Rd/01
|
Imp. Of road from Badarpur UP-Lowkati UP via Skandar Rari Bari road by HBB from ch.4955-5990m with 1No U-Drain at ch.5779m
|
BDRIDP
|
patuakhali-s
|
|
1.04
|
|
|
32.00
|
M/S. Hima Bricks
|
27.62
|
|
|
|
100
|
|
|
|
|
101
|
BDRIDP/ PAT/SAD/ UZR-Rd/01
|
Imp. Of road Patuakhali-Brisal R&H to Dumki Upazila via Moukaran GC (Sadar part) road by BC from ch.3255-5035m
|
BDRIDP
|
patuakhali-s
|
|
1.78
|
|
|
126.67
|
M/S. Nazmul Shahdat Traders
|
110.77
|
|
|
|
100
|
|
|
|
|
102
|
BDRIDP/ PAT/SDR/ UN-Rd/02
|
Improvement of road from Auliapur UP-Badura GC via Dhakkin Badura GPS (Dhakkin Badura GPS cum Cyclone Center) road (ID No. 578953035) by BC from Ch. 3500m-4500m under Patuakhali Sadar, Patuakhali.
|
BDRIDP
|
patuakhali-s
|
|
1.00
|
|
|
114.23
|
M/S. Lutfa Construction
|
93.02
|
|
|
|
100
|
|
|
|
|
103
|
BDRIDP/ PAT/SAD/ UZ-Rd/02
|
Improvement of road from Khaser hat GC to Bottolbunia GC via Hazikhali Bazar road by Earth work (Ch. 3805-4805m)
|
BDRIDP
|
patuakhali-s
|
|
1.00
|
|
|
66.53
|
M/S. Mohiuddin Ahmed
|
58.80
|
|
|
|
100
|
|
|
|
|
104
|
BDRIDP/PAT/SAD/UZ-Rd/03
|
Improvement of road from Patuakhali Barisal R&H (Moukaran Bridge)-Dumki UZHQ via Moukaran GC Road (Sadar Part) from Ch. 5035m-6965m (Road ID No. 578952007)
|
BDRIDP
|
patuakhali-s
|
|
1.93
|
|
|
131.69
|
M/S. Shakil Enterprise
|
104.92
|
|
|
|
65
|
|
|
|
|
105
|
BDRIDP/PAT/SDR/UZ-Rd/04
|
Improvement of Road from Patuakhali-Betagi R&H Pairakunja Bazar Kakrabunia GC via Officer hat Sadar Part from Ch. 3200m-5200m including 3 Nos 1.50mx1.50m RCC Box Culvert at Ch. 3615m 3700m & 4840m ID No. 578952011
|
BDRIDP
|
patuakhali-s
|
|
2.00
|
|
|
155.83
|
M/S. Nazmus Shahdat Traders
|
154.36
|
|
|
|
100
|
|
|
|
|
106
|
BDRIDP/PAT/SDR/CCA-Rd/08
|
Improvement of road From Khejurtala Bazar-Dhankhali Bazar via Dakurbunia GPS at Ch. 0.00-1000.00m including 2Nos. 1.50mX1.50m RCC Box Culvert at Ch. 220.00m & 415.00m (ID No. 578954096)
|
BDRIDP
|
patuakhali-s
|
|
1.00
|
|
|
68.65
|
Md. Gius Uddin
|
61.79
|
|
|
|
100
|
|
|
|
|
107
|
BDRIDP/PAT/SDR/CCA-Rd/09
|
Improvement of road From Sreerapur Bazar-Munshir hat via Parkartikpasha GPS at ch. 765.00m-2300.00m including 1No. 1.50mX1.50m RCC Box Culvert at Ch. 1250.00m (ID No. 578954052)
|
BDRIDP
|
patuakhali-s
|
|
1.54
|
|
|
96.81
|
Md. Firoz
|
91.01
|
|
|
|
35
|
|
|
|
|
108
|
BDRIDP/PAT/SDR/CCA-Rd/10
|
Improvement of road From (UZR) Fadea Bazar-(UNR) Gadur Bazar ch. 0.00-1300.00m including 1No. 1.50mX1.50m RCC Box Culvert at Ch. 1000.00m (ID No. 578954156)
|
BDRIDP
|
patuakhali-s
|
|
1.30
|
|
|
85.19
|
M/S. Soma Enterprise
|
77.47
|
|
|
|
50
|
|
|
|
|
109
|
BDRIDP/PAT/SAD/UZ-Rd/05
|
Improvement of BC road From Khasher Hat GC - Bottlebunia GC via Hazikhali Hat at Ch. 2450m-3805m including 01 No. 1.00mx1.00m RCC Box Culvert at ch. 3053m. (ID No. 578952006)
|
BDRIDP
|
patuakhali-s
|
|
1.36
|
|
|
109.33
|
Abdul Kader Khan
|
103.77
|
|
|
|
70
|
|
|
|
|
110
|
BDRIDP/PAT/SAD/CCA-Rd/11
|
Improvement of BC road From UZR (Hazikhali Mohammadia Madrasha) to UNR (Atahar Pada bari) - Iron Bridge road at Ch. 00m-1830m including 02 Nos. 1.50mx1.50m RCC Box Culvert at ch. 510m & 1380m. (ID No. 578954168)
|
BDRIDP
|
patuakhali-s
|
|
1.83
|
|
|
116.16
|
Md. Bashir Uddin
|
116.06
|
|
|
|
100
|
|
|
|
|
111
|
BDRIDP/PAT/SAD/UZ-Rd/06
|
Improvement of Patuakhali UZHQ-Muradia GC via Sreerampur Bazar (Sadar Part) at Ch. 6785m-8785m. Including 04 Nos 1.50mX1.50m, 01 No. 3.00mX3.00m (2-vent) RCC Box Culvert at Ch. 6945m, 7565m 7835m, 8495m & 7357m
|
BDRIDP
|
patuakhali-s
|
|
2.00
|
|
|
159.35
|
Md. Manebur Rahman
|
154.45
|
|
|
|
40
|
|
|
|
|
112
|
BDRIDP/ PAT/SAD/ UZR-ST/01
|
Const.of 1No 4.00mx4.00m RCC Box Culvert on Patuakhali-Barisal R&H to Dumki Upazila via Moukaran GC (Sadar part) road at ch.4715m.
|
BDRIDP
|
patuakhali-s
|
|
|
|
|
22.31
|
M/S. Gazi Enterprise
|
17.52
|
|
|
|
100
|
|
|
|
|
113
|
BDRIDP/ PAT/SAD/ CCA-ST/01
|
Const. of 3.00mx3.00m RCC Box culvert on Moukarn UNR road start Purbo Talikhali Mazibar dokan-North side Kafulabunia khal-daritaluk P/S & H/S road via Abdul Latif Howlader bari road at ch.1140m
|
BDRIDP
|
patuakhali-s
|
|
|
|
|
10.62
|
M/S. Masud & Brothers
|
7.78
|
|
|
|
100
|
|
|
|
|
114
|
BDRIDP/ PAT/SDR/ CCA-St/02
|
Const. of 1 No. 3.00mX1.00m Box culvert on Pangasha UP-Gazipur R&H (Bus Stand)-Jamla road upto Sreerampur Sluice Gate road at ch.4380m.
|
BDRIDP
|
patuakhali-s
|
|
|
|
|
9.79
|
M/S. Gazi Enterprise
|
7.29
|
|
|
|
100
|
|
|
|
|
115
|
BDRIDP/ PAT/SAD/ CCA-St/03
|
Const. of 1 No 3.00mx3.00m Box Culvert & 03 Nos U-Drain on Low Kathi Officer hat to Kaler hat via Kismat Moukaran Primary School road at ch.2630m, 1792m,2309m & 2976m.
|
BDRIDP
|
patuakhali-s
|
|
|
|
|
12.69
|
M/S. Gazi Enterprise
|
9.83
|
|
|
|
100
|
|
|
|
|
116
|
BDRIDP/ PAT/SDR/ UN-St/01
|
Construction of 02 Nos. 3.00mx3.00m RCC Box Culvert on Auliapur UP-Badura GC via Dhakkin Badura GPS (Dhakkin Badura GPS cum Cyclone Center) road at Ch. 3600m & 4150m (ID No. 578953035) under Patuakhali Sadar, Patuakhali.
|
BDRIDP
|
patuakhali-s
|
|
|
|
|
28.39
|
M/S. Soma Enterprise
|
19.42
|
|
|
|
100
|
|
|
|
|
117
|
BDRIDP/PAT/SAD/UZ-St/02
|
Construction of 2Nos 1.00mX1.00m RCC Box Culvert on Khaser Hat GC via Hazikhali Bazar road at Ch. 4285m & 4450m (ID No. 578952006)
|
BDRIDP
|
patuakhali-s
|
|
|
|
|
0.00
|
M/S. Talukder Enterprise
|
4.37
|
|
|
|
100
|
|
|
|
|
118
|
BDRIDP/PAT/SAD/UZ/St-03
|
Construction of 2 Nos. 3.00mx3.00m, 2 Nos. 2.00mx2.00m & 2 Nos. 1.50mx1.50m RCC Box Culvert on Patuakhali Barisal R&H (Moukaran Bridge)-Dumki UZHQ via Moukaran GC Road (Sadar Part) at Ch. 5865m, 6135m, 6592m, 6435m, 5185m & 5499m. (Road ID No. 578952007)
|
BDRIDP
|
patuakhali-s
|
|
|
|
|
52.98
|
Md. Gius Uddin
|
35.96
|
|
|
|
100
|
|
|
|
|
119
|
BDRIDP/PAT/SAD/CCA-St/04
|
Construction of 2-Vent 3.00mx3.00m RCC Box Culvert on Auliapur UP-Badura GC via Dakkhin Badura GPS at Ch. 6500m (Auliapur UP-H/O Bonda Ali Miah South Badura Bazar)
|
BDRIDP
|
patuakhali-s
|
|
|
|
|
19.38
|
Md. Mahafuz Khan
|
17.44
|
|
|
|
60
|
|
|
|
|
120
|
BDRIDP/PAT/SAD/UZ-St/04
|
Construction of 42.06m RCC Girder Bridge on Patuakhali Barisal RHD (Moukaron Bridge)-Dumki UZHQ via Moukaran GC (Sadar Part) at Ch. 3282m (Road ID: 578952007)
|
BDRIDP
|
patuakhali-s
|
|
|
|
|
268.58
|
M/S. Amir Engineering Corporation-M.M. Builders & Engineers Ltd.-M/S. Niaz Traders-JV
|
241.72
|
|
|
|
45
|
|
|
|
|
121
|
BDRIDP/ PAT/RANG/ UN-Rd(R)/01
|
Rehabilitation of road from Chottobaisdia UP-Rangabali UP (Upto Samudafath) road from Ch. 00-1595m (ID No. 578583016) under Rangabali, Patuakhali.
|
BDRIDP
|
Rangabali
|
|
1.60
|
|
|
100.75
|
M/S. Palli Strores
|
93.09
|
|
|
|
100
|
|
|
|
|
122
|
BDRIDP/PAT/RAG/GHT/01
|
Construction of RCC Ghat at Khalgor Bazar (Kachibunia Bazar)
|
BDRIDP
|
Rangabali
|
|
|
|
|
30.53
|
M/S. Deip Enterprise
|
30.52
|
|
|
|
0
|
|
|
|
|
123
|
CIB-Pat-W-87
|
Const. of 426 m long PSC Girder Bridge with viadact at Ch.90m over Sutabaria river on Alipur UPC to Cotkhali Bazar via Kalamiar Hat (Dasmina part) road under Dasmina Upazila, District: Patuakhali
.
|
CIBRR
|
dashmina
|
[Road ID: 578523006]
|
0.09
|
426.00
|
69
|
4329.62
|
Nabarun Traders Ltd. & M/S Abul Kalam Azad (JV), House # 18/7, Bashir Uddin Road, Kalabagan, Dhaka.
|
5090.82
|
30/07/2020
|
06/08/2020
|
30/06/2025
|
77
|
3752.89
|
69
|
05/02/2025
|
|
124
|
CIB-Pat-W-24
|
Const. of 90m long PSC Girder Bridge over Pagla river on Patuakhali Barishal RHD (Pagla)-Pangashia UP via Hazirhat-Doparhat road at Ch.9306m under Dumki Upazila, Dist. Patuakhali
|
CIBRR
|
dumki
|
[Road ID: 578963014].
|
|
90.00
|
91
|
870.29
|
QC-KKE JV Mahtab Center(12th floor),BijoyNagar, Dhaka-1000
|
849.04
|
31/05/2017
|
07/06/2017
|
28/04/2021
|
100
|
779.09
|
91
|
05/02/2025
|
|
125
|
CIB-Pat-W-84
|
Const. of 41 m long RCC Girder Bridge over Tagasia Khal at Ch.50m on Tegachia-Jamainagar Bazar road at Matagonj Up under Kalapara Upazila, District: Patuakhali
|
CIBRR
|
kalapara
|
[Road ID: 578665298].
|
|
41.00
|
100
|
324.98
|
PTSL MAITREE (PVT) LTD - M/S. AMIR ENGINEERING CORPORATION - RAB-RC (PVT.) LTD. JV, College Row, Barisal, Bangladesh
|
255.21
|
24/12/2017
|
31/12/2017
|
30/12/2018
|
100
|
272.87
|
100
|
05/02/2025
|
|
126
|
CIB-Pat-W-86
|
Const. of 96 m long PSC Girder Bridge at Ch.1500m over Srimonto river on Kathaltali GC- Patuakhali-Betagi RHD (Thana Bridge) road and Kathaltoli roadunder Mirzaganj Upazila, District: Patuakhali
|
CIBRR
|
mirjaganj
|
578762004
|
|
96.00
|
95
|
1124.30
|
"M/S Abul Kalam Azad, Azad Bhaban, Muslimpara, Patuakhali Sadar, Patuakhali."
|
1360.63
|
10/10/2019
|
17/10/2019
|
30/05/2023
|
100
|
1305.06
|
95
|
05/02/2025
|
|
127
|
e-GP/CTCRP/PATU/RD-01
|
Construction/Improvement of 03 Nos Road under Patuakhali Pauroshava, District: Patuakhali
|
CTCRP
|
patuakhali-s
|
|
5.96
|
|
|
239590167.17
|
M/S Hamim International
|
262705918.47
|
21/03/2024
|
|
21/09/2025
|
21
|
|
|
02/04/2024
|
|
128
|
e-GP/CTCRP/PATU/RD-02
|
Construction/Improvement of 07 nos Road under Patuakhali Paurashava, District:Patuakhali
|
CTCRP
|
patuakhali-s
|
|
5.84
|
|
|
210508494.20
|
Md.Rashaduzzaman Peter
|
230607508.10
|
|
|
31/07/2025
|
25
|
|
|
25/03/2024
|
|
129
|
e-GP/CTCRP/PATU/DR-01
|
Construction/Improvement of 15 nos Drains under Patuakhali Pourashava, District:Patuakhali
|
CTCRP
|
patuakhali-s
|
|
4.13
|
|
|
149801546.64
|
M/S Kohinoor Enterprise
|
149794319.20
|
|
|
06/05/2025
|
70
|
|
|
25/03/2024
|
|
130
|
e-GP/CTCRP/PATU/DR-02
|
Construction/Improvement of 14 nos Drain under Patuakhali Pourashava, District: Patuakhali
|
CTCRP
|
patuakhali-s
|
|
4.33
|
|
|
155458352.00
|
M/S Hamim International
|
163104654.39
|
|
|
06/05/2025
|
40
|
|
|
25/03/2024
|
|
131
|
DIRIP-2/VR/BC-23/Patuakhali/2017-18 (200107)
|
Improvement of Chiker gudhi-SikderBari Near Bara Gopaldi UZR Road by BC (Ch. 0-1500m), (ID: 578524023), (Dashmina)
|
DIRIP-2
|
dashmina
|
|
1.50
|
|
|
44.50
|
M/S Palli StorsTown Kalikapur Patuakhali
|
42.27
|
|
|
|
100
|
|
|
31/12/2021
|
|
132
|
DIRIP-II/UZR/Str-01/Patuakhali /2018-19 (238567)
|
Construction of 13m Long RCC Bridge on Barogopaldi GC-Ayaser hat RHD Road at Ch. 7300m under Dashmina Upazila, District: Patuakhali, (Road ID: 578522009)
|
DIRIP-2
|
dashmina
|
578522009
|
|
13.00
|
|
127.22
|
Rezwanul Maksud, Eidgah Sarak, Patuakhali.
|
120.86
|
21/01/2019
|
28/01/2020
|
28/01/2020
|
100
|
|
|
31/12/2021
|
|
133
|
DIRIP-2/VR/BC-28/Patuakhali/2018-19
|
Improvement of Char Borhan Madrasha-Char Shahjalal Kheya Ghat Road by BC Ch. 00-2000m
|
DIRIP-2
|
dashmina
|
578525171
|
2.00
|
|
|
250.00
|
M/S. Rupali Construction & Sarika Traders (JV), Char Montaz, Rangabali, Patuakhali.
|
213.00
|
23/07/2019
|
31/07/2020
|
31/07/2020
|
100
|
182.61
|
|
31/12/2021
|
|
134
|
DIRIP-II/UZR/Str-01/Patuakhali /2018-19
|
Construction of 13m Long RCC Bridge on Barogopaldi GC-Ayaser hat RHD Road at Ch. 7300m
|
DIRIP-2
|
dashmina
|
578522009
|
|
13.00
|
|
127.22
|
Rezwanul Maksud, Eidgah Sarak, Patuakhali.
|
120.86
|
21/01/2019
|
28/01/2020
|
28/01/2020
|
100
|
94.60
|
|
31/12/2021
|
|
135
|
DIRIP-2/UNRStr-14/Patuakhali/18-19
|
Construction of 28m PSC bridge on Dashmina UPC-Mashukhali Hat Road at Ch. 470m
|
DIRIP-2
|
dashmina
|
578523012
|
|
28.00
|
|
318.74
|
M/S. Abul Kalam Azae & M/S. Deip Enterprise (JV), Town Kalikapur, Patuakhali.
|
281.60
|
03/06/2019
|
09/06/2020
|
09/06/2020
|
75
|
90.00
|
|
31/12/2021
|
|
136
|
DIRIP-2/UNR(Str)-19/Patuakhali/2018-19
|
Construction of 66m long RCC Bridge at Ch. 7000m on Bohrampur UPC - Thakurer Hat Road
|
DIRIP-2
|
dashmina
|
578523010
|
|
66.00
|
|
694.44
|
M/S. Eli Enterprise and Md. Enayet Hossain (JV), Natun Bazar, Patuakhali.
|
723.26
|
03/06/2019
|
09/06/2020
|
09/06/2020
|
100
|
529.40
|
|
31/12/2021
|
|
137
|
DIRIP-2/UNR/BC-04/Patuakhali/2017-18(176405)
|
Improvement of Dashmina UPC-Masuakhali hat from Ch. 2000.00-3232.00m (Id No: 578523011) [Salvage Cost: 31,990] [Dashmina]
|
DIRIP-2
|
dashmina
|
578523011
|
1.02
|
|
|
101.10
|
M/S Sikder EnterpriseMominpur, Bauphal, Patuakhali
|
96.04
|
04/06/2018
|
04/06/2018
|
03/06/2019
|
100
|
|
|
14/07/2020
|
|
138
|
DIRIP-2/UNR/BC-05/Patuakhali/2017-18(176411)
|
Improvement of road of Alipur UPC Modhupura hat from Ch. 2000-4300.00m (Id No: 578523015) [Dashmina]
|
DIRIP-2
|
dashmina
|
578523015
|
2.30
|
|
|
230.57
|
M/S Najmus Shahadat tradersBadarpur, Patuakhali
|
217.95
|
29/05/2018
|
29/05/2018
|
05/06/2019
|
100
|
|
|
14/07/2020
|
|
139
|
DIRIP-II/UNR/Str-08/Patuakhali/2018-19
|
Construction of 22m Long RCC Bridge on Basbaria UPC-Primary School Hat Road at Ch. 470m
|
DIRIP-2
|
dashmina
|
578523014
|
|
22.00
|
|
169.40
|
Md. Mahabubur Rahman, Bogura, Bahrampur, Dashmina, Patuakhali.
|
161.00
|
21/01/2019
|
28/01/2020
|
28/01/2020
|
100
|
156.01
|
|
14/07/2020
|
|
140
|
DIRIP-II/UNR/Str-09/Patuakhali /2018-19
|
Construction of 24m Long RCC Bridge on Alipur UPC-Madupura Hat Road at Ch. 1525m
|
DIRIP-2
|
dashmina
|
: 578523015
|
|
24.00
|
|
184.00
|
Md. Kamal Hossain, Nalkhola Bandar, Dashmina, Patuakhali.
|
174.73
|
21/01/2019
|
28/01/2020
|
28/01/2020
|
100
|
169.00
|
|
14/07/2020
|
|
141
|
DIRIP-2/UNR(Str)-03/Patuakhali/2018-19
|
Construction of 22m Long RCC Bridge on Rangopaldi Bridge UNR-Rabibaria Hat RHD Road at Ch. 413m under Dashmina Upazila, District: Patuakhali,
|
DIRIP-2
|
dashmina
|
578524122
|
|
22.00
|
|
147.86
|
M/S. Sunrise Construction, Charpara, Patuakhali.
|
140.05
|
21/01/2019
|
28/01/2019
|
28/01/2019
|
88
|
118.44
|
|
12/07/2020
|
|
142
|
DIRIP-2/Patua/Dash/M-02/2018-19 (238573)
|
Maintenance of Galachipa UZHQ- Kalagachi GC Road.(Ch.3560-7000m) (ID No.578523010) (Galachipa)
|
DIRIP-2
|
dashmina
|
578523010
|
2.80
|
|
|
133.46
|
M/S. Mamun Construction, Thanapara, Patuakhali.
|
126.79
|
21/01/2019
|
28/01/2020
|
28/01/2020
|
100
|
34.61
|
|
12/07/2020
|
|
143
|
DIRIP-2/UNR(Str)-04/Patuakhali/2018-19
|
Construction of 22.00m Long RCC Bridge on Rangopaldi Bridge UNR-Rabibaria Hat RHD Road (Ch. 1260m) (ID No. 578524122) (Dashmina)
|
DIRIP-2
|
dashmina
|
578524122
|
|
22.00
|
|
148.78
|
M/S. Eva Construction, Baitul Aman Lane, Patuakhali.
|
141.34
|
04/01/2019
|
21/01/2020
|
21/01/2020
|
90
|
120.00
|
|
28/06/2020
|
|
144
|
DIRIP-2/Patua/Dash/M-03/2018-19 (238573)
|
Maintenance of Baharampur UPC-Thakurer hat.Road (Ch. 2800-5657m) (ID No. 578523010) (Dashmina).
|
DIRIP-2
|
dashmina
|
578523010
|
2.80
|
|
|
211.36
|
Golam Mostofa, Arambag, Patuakhali.
|
200.79
|
21/01/2019
|
31/01/2020
|
31/01/2020
|
100
|
20.05
|
|
28/06/2020
|
|
145
|
DIRIP-2/VRStr-01/Patuakhali/2017-18
(176406)
|
Construction of 2.00x2.00m Box-Culvert on Ch. 3025.00m on Lebukhali Golachipa RHD near joutha bazar-Alipur GC Ulania GC road via ashimollar hat (Id No: 578524035) [Dashmina]
|
DIRIP-2
|
dashmina
|
|
2.00
|
|
|
7.61
|
Md. Khabir Sikder
Govt. Girls School Road, Patuakhali
|
7.23
|
|
|
04/12/2018
|
100
|
|
|
|
|
146
|
DIRIP-2/UNRStr-01/Patuakhali/2017-18
(176407)
|
Construction of 2.00x2.00 Box-Culvert on Ch. 1700.00m on Bashbaria UPC-Primary school hat road (Id No: 578523014) [Dashmina]
|
DIRIP-2
|
dashmina
|
|
2.00
|
|
|
7.59
|
Md. Jasim Uddin
Subidkhali, Mirjaganj, Patuakhali
|
7.21
|
|
|
15/11/2018
|
100
|
|
|
|
|
147
|
DIRIP-2/VRStr-02/Patuakhali/2017-18
(176408)
|
Construction of RCC Box-Culvert on 1490.00, 2650.00 & 4570.00m on Betagi sikder bari-Changoria purbo side moishadi via rambollov madrasha road (Id No: 578524024) [Dashmina]
|
DIRIP-2
|
dashmina
|
|
5.00
|
|
|
17.25
|
Happy Construction
Saubjbag, Patuakhali
|
16.39
|
|
|
04/12/2018
|
100
|
|
|
|
|
148
|
DIRIP-2/VR/BC-15/Patuakhali/2017-18
(176409)
|
Improvement of Chandpur hat-Modhupur cyclone shelter road (Kalamia bazar-Alaminer bari) from Ch. 00-1280.00m (Id No: 578524024) [Dashmina]
|
DIRIP-2
|
dashmina
|
|
1.28
|
|
|
112.62
|
M/S Sikder Enterprise
Mominpur, Bauphal, Patuakhali
|
106.99
|
|
|
|
100
|
|
|
|
|
149
|
DIRIP-2/VR/BC-16/Patuakhali/2017-18
(176410)
|
Improvement of road from Ronogopaldi bridge UNR-Robibaria hat RHD from Ch. 2010-2835.00m (Id No: 578524122) [Dashmina]
|
DIRIP-2
|
dashmina
|
|
0.83
|
|
|
61.47
|
M/S Md. Delwar Hossain
Lebukhali, Patuakhali
|
58.39
|
|
|
04/06/2019
|
100
|
|
|
|
|
150
|
DIRIP-2/UNRStr-02/Patuakhali/2017-18
(192575)
|
Construction of 4.00mX4.00m Box Culvert on Baharampur UPC-Thakurerhat Road at Ch. 4500m (ID: 578523010), (Dashmina)
|
DIRIP-2
|
dashmina
|
|
4.00
|
|
|
24.28
|
M/S. Mim Enterprise
Khalishakhali, Patuakhali
|
23.07
|
|
|
05/12/2019
|
100
|
|
|
|
|
151
|
DIRIP-2/VR/BC-11/Patuakhali/2017-18(176400)
|
Improvement of Sontoshdi launch ghat-Tulatola road (Muradia UP-Sontoshdi launch ghat A.K high school via Amir hossen launch ghat road) from ch.00-1000m (Id No: 578964003) [Dumki]
|
DIRIP-2
|
dumki
|
|
1.00
|
|
|
77.09
|
Md. GiusuddinArambag, Patuakhali
|
73.24
|
|
13/05/2018
|
19/05/2019
|
100
|
|
|
31/12/2021
|
|
152
|
DIRIP-2/VR/BC-12/Patuakhali/2017-18
(176402)
|
Improvement of Lebukhali-Boga RHD (Chor gorobdi ferry ghat)-Amir hossen howlader bazar via A Kashem high school (Muradia UP-Sontoshdi Launch ghat AK high school via Amir hossen launch ghat road) from Ch. 2000.00-4538.00m and Box-culvert on 2050.00,2221.0
|
DIRIP-2
|
dumki
|
|
2.05
|
|
|
180.41
|
Md. Enayet Hossain
Natunbazar, Patuakhali
|
171.39
|
|
13/05/2018
|
19/05/2019
|
100
|
|
|
|
|
153
|
DIRIP-2/VR/BC-19/Patuakhali/2017-18(192069)
|
Improvement of Kalam Gradge RHD-Paul Bari UZR Road by BC (Ch. 0-5340m), (ID: 578574150), (Galachipa)
|
DIRIP-2
|
galachipa
|
|
5.31
|
|
|
415.34
|
M/S Palli StorsTown Kalikapur Patuakhali
|
404.93
|
|
14/08/2018
|
20/08/2019
|
100
|
|
|
31/12/2021
|
|
154
|
DIRIP-2/VR/BC-20/Patuakhali/2017-18(192070)
|
Improvement of Char Kazol UZR-Chota Kazol Ghat Road by BC (Ch. 00-4600m), (ID No: 578574122), (Galachipa)
|
DIRIP-2
|
galachipa
|
|
4.59
|
|
|
332.46
|
Md. FirozFire Service RoadPatuakhali
|
317.81
|
|
14/08/2018
|
20/08/2019
|
100
|
|
|
31/12/2021
|
|
155
|
DIRIP-2/VR/BC-17/Patuakhali/2017-18(192071)
|
Improvement of N.Sonkhola G.P/School-Lamna Sr Madrasha Road by BC (Ch. 00-3800m), (ID: 578574009), (Galachipa)
|
DIRIP-2
|
galachipa
|
|
3.76
|
|
|
270.19
|
M/S Abdullah Enterprise Holding No-287, Morium Bhaban, Moshjid Lane, Simul Bag, Patuakhali
|
256.68
|
|
29/07/2018
|
04/08/2019
|
100
|
|
|
31/12/2021
|
|
156
|
DIRIP-2/VR/BC-18/Patuakhali/2017-18(192072)
|
Improvement of Sailabunia Primary school to Mudirhat Road by BC (Ch. 00-1250m), (ID: 578574170), (Galachipa)
|
DIRIP-2
|
galachipa
|
|
1.24
|
|
|
98.00
|
M/S Palli StorsTown Kalikapur Patuakhali
|
93.10
|
|
29/07/2018
|
04/08/2019
|
100
|
|
|
31/12/2021
|
|
157
|
DIRIP-2/VR/BC-21/Patuakhali/2017-18(192074)
|
Improvement of Golkhali Kheaghat-Kalirchar G.p.school Road by BC (Ch. 0-2950m), (ID: 578575095), (Galachipa)
|
DIRIP-2
|
galachipa
|
|
2.95
|
|
|
220.31
|
M/S SOMA ENTERPRISEOLD BASS TERMINAL ROAD PATUAKHALI
|
209.29
|
|
29/07/2018
|
04/08/2019
|
80
|
|
|
31/12/2021
|
|
158
|
DIRIP-2/VR/BC-24/Patuakhali/2018-19 (293037)
|
Improvement of Gilabaria Bazar-Banshbaria School via Abid Kha Road by BC from Ch. 00m-3100m ID No. 578574086 Galachipa
|
DIRIP-2
|
galachipa
|
578574086
|
3.10
|
|
|
190.04
|
Shimanto Trading Angency
|
180.54
|
23/07/2019
|
30/09/2020
|
30/09/2020
|
100
|
|
|
31/12/2021
|
|
159
|
DIRIP-2/VR/BC-25/Patuakhali/2018-19 (293038)
|
Improvement of Gilabaria Bazar-Banshbaria School via Abid Kha Road by BC from Ch. 3100m-6200m ID No. 578574086 Galachipa
|
DIRIP-2
|
galachipa
|
578574086
|
3.10
|
|
|
272.89
|
Kohinur Enterprise & Mizanur Alam ( JV)
|
268.21
|
30/09/2019
|
06/10/2020
|
06/10/2020
|
65
|
|
|
31/12/2021
|
|
160
|
DIRIP-2/VR/BC-26/Patuakhali/2018-19 (293039)
|
Improvement of Majhgram UZR Mallik Bari Bandh-Dabiruddin Bari Road Chiknikandi UP-Katkhali Lanch Ghat by BC from Ch. 00m-2800m ID No. 257857429 Galachipa
|
DIRIP-2
|
galachipa
|
257857429
|
2.80
|
|
|
221.99
|
" Md. Enayet Hossain, Natun Bazar, Patuakhali. "
|
203.55
|
15/09/2019
|
21/09/2020
|
21/09/2020
|
100
|
|
|
31/12/2021
|
|
161
|
DIRIP-2/VR/BC-27/Patuakhali/2018-19 (293040)
|
Improvement of Amkhola RHD-Tafalbaria UNR Amkhola UP Office-Mushorighati Sluice Road by BC from Ch. 2000m-5500m ID No. 578574102 Galachipa Salvage Cost BDT 814635.00
|
DIRIP-2
|
galachipa
|
578574102
|
2.50
|
|
|
298.15
|
Akteruzaman-Samim Ahasaun
|
275.14
|
09/09/2019
|
08/09/2020
|
08/09/2020
|
100
|
|
|
31/12/2021
|
|
162
|
DIRIP-2/UNRStr-15/Patuakhali/18-19 (287507)
|
Construction of 30m PSC bridge on Gozalia UP-Thakur Bazar Gozalia UP-Dakua UP via Gozalia Bazar Road at Ch. 10m under Galachipa Upazila Dist Patuakhali ID No. 578573026
|
DIRIP-2
|
galachipa
|
578573026
|
30.00
|
|
|
227.52
|
QC-KKE (JV)
|
209.95
|
03/06/2019
|
09/06/2020
|
09/06/2020
|
85
|
|
|
31/12/2021
|
|
163
|
DIRIP-2/UNRStr-16/Patuakhali/2018-19 (269587)
|
Construction of 54m long RCC Bridge at Ch. 1968m on Golkhali UPC - Naluabagi Bazar Naluabagi - Bazar RHD via UP office Road under Galachipa Upazila District Patuakhali Road ID- 578573022
|
DIRIP-2
|
galachipa
|
578573022
|
54.00
|
|
|
427.73
|
QC-KKE (JV)
|
390.00
|
03/06/2009
|
09/06/2020
|
09/06/2020
|
88
|
|
|
31/12/2021
|
|
164
|
DIRIP-2/UNRStr-17/Patuakhali/2018-19 (269588)
|
Construction of 48m long RCC Bridge at Ch. 4362m on Chinikandi UPC Amkhola UPC Road under Galachipa Upazila District Patuakhali Road ID- 578573008
|
DIRIP-2
|
galachipa
|
578573008
|
|
48.00
|
|
465.40
|
M/S Palli Stors
|
440.78
|
03/06/2019
|
09/06/2020
|
09/06/2020
|
85
|
|
|
31/12/2021
|
|
165
|
DIRIP-2/UNR/Str-18/Patuakhali/2018-19 (269578)
|
Construction of 40m long PSC Bridge at Ch. 1242m on Golkhali UPC - Naluabagi Bazar Naluabagi - Bazar RHD via UP office Road under Galachipa Upazila District Patuakhali Road ID- 578573022
|
DIRIP-2
|
galachipa
|
578573022
|
|
40.00
|
|
506.67
|
Kohinoor Enteprise & Mizanur Alam (JV), Mridha Bari Sarak, Town Kalikapur, Patuakhali.
|
519.92
|
04/08/2019
|
10/08/2020
|
10/08/2020
|
88
|
|
|
31/12/2021
|
|
166
|
DIRIP-2/UNR(Str)-20/Patuakhali/2018-19 (269801)
|
Construction of 84m long RCC Bridge at Ch. 2303m on Amkhola UPC (Bhangra RHD)- Friday Hat Road under Galachipa Upazila District Patuakhali Road ID- 578573002
|
DIRIP-2
|
galachipa
|
578573002
|
|
48.00
|
|
706.30
|
QC-KKE(JV)
|
669.52
|
03/06/2019
|
09/06/2020
|
09/06/2020
|
45
|
|
|
31/12/2021
|
|
167
|
DIRIP-2/VRStr-08/Patuakhali/ 2018-19 (269585)
|
Construction of 57m long RCC Bridge at Ch. 2208m on Tetultola Bazar UZR - Ulania GC Road under Galachipa Upazila District Patuakhali Road ID- 578574206
|
DIRIP-2
|
galachipa
|
578574206
|
|
57.00
|
|
309.40
|
M/S Abul Kalam Azad & M/S. Deip Enterprise (JV)
|
283.16
|
03/06/2019
|
09/06/2020
|
09/06/2020
|
90
|
|
|
31/12/2021
|
|
168
|
DIRIP-II/UNR/Str-10/Patuakhali /2018-19 (238571)
|
Construction of 24m Long RCC Bridge on Panpatty UPC- Panpatty Bazar (Galachipa Kalikapur-Panpotty Launch Ghat) Road at Ch. 2600m under Galachipa Upazila, District: Patuakhali, (Road ID: 578573011)
|
DIRIP-2
|
galachipa
|
578573011
|
|
24.00
|
|
161.35
|
M/S. Khairul Enterprise, Muslimpara, Patuakhali.
|
153.28
|
21/01/2019
|
28/01/2020
|
28/01/2020
|
100
|
|
|
31/12/2021
|
|
169
|
DIRIP-2/VR/BC-24/Patuakhali/2018-19
|
Improvement of Gilabaria Bazar-Banshbaria School via Abid Kha Road by BC from Ch. 00m-3100m
|
DIRIP-2
|
galachipa
|
578574086
|
3.10
|
|
|
190.00
|
Shimanto Trading Agency, LGED, Patuakhali.
|
180.54
|
23/07/2019
|
30/09/2020
|
30/09/2020
|
100
|
62.53
|
|
31/12/2021
|
|
170
|
DIRIP-2/VR/BC-13/Patuakhali/2017-18(176403)
|
Improvement of Gozalia UPC-Gozalia launch ghat road (Bahar gozalia madrasha-WAPDA-Adani bazar Gozalia bridge bazar from Ch. 00-3130.00m (Id No: 578575027) [Galachipa]
|
DIRIP-2
|
galachipa
|
|
3.12
|
1.00
|
|
231.84
|
M/S Najmus Shahadat tradersBadarpur, Patuakhali
|
225.65
|
22/10/2018
|
22/10/2018
|
04/06/2019
|
100
|
|
|
14/07/2020
|
|
171
|
DIRIP-2/VR/BC-14/Patuakhali/2017-18(176404)
|
Improvement of Kharizzama bazar UZR-Patabunia GC (Icchadi kheyaghat amkhola UP Kolagachia GC) from Ch. 00-2500.00m (Id No: 578574201) [Salvage Cost: 23,80,856] [Galachipa]
|
DIRIP-2
|
galachipa
|
|
2.50
|
|
|
174.71
|
M/S Sikder EnterpriseMominpur, Bauphal, Patuakhali
|
16.60
|
|
28/05/2018
|
03/06/2019
|
100
|
|
|
14/07/2020
|
|
172
|
DIRIP-2/UNR/BC-07/Patuakhali/2017-18(192574)
|
Improvement of Charkazol UPC - Jahazmara Sluice Road by BC (Ch. 7000m-12300m), (ID: 578573029), (Galachipa)
|
DIRIP-2
|
galachipa
|
|
5.23
|
|
|
398.71
|
M/S Palli StorsTown Kalikapur Patuakhali
|
388.48
|
|
14/08/2018
|
20/08/2019
|
68
|
|
|
14/07/2020
|
|
173
|
DIRIP-2/VR/BC-22/Patuakhali/2017-18(192576)
|
Improvement of Golkhali Upc-Julakha Bazar RHD Road (Galachipa Head Quarter-Golkhali-Gazipur GC) by BC (Ch. 0-2450m), (ID: 578574216), (Galachipa), (Salvage BDT: 266,858)
|
DIRIP-2
|
galachipa
|
|
2.39
|
|
|
172.48
|
M/S Sikder Enterprise, Muradia, Dumki, Patuakhali
|
163.86
|
|
29/07/2018
|
04/08/2019
|
65
|
|
|
14/07/2020
|
|
174
|
DIRIP-2/UNR/BC-08/Patuakhali/2017-18(211187)
|
Improvement of Chiknikandi UPC-Amkhola UPC road (Ch.5800m-6800m) By BC (ID.No. 578573008) (Galachipa)
|
DIRIP-2
|
galachipa
|
|
0.60
|
|
|
44.50
|
M/S. Md. Delowar HossainDumkiPatuakhali
|
42.27
|
22/10/2018
|
28/04/2019
|
28/04/2019
|
100
|
|
|
14/07/2020
|
|
175
|
DIRIP-II/UNR/Str-11/Patuakhali /2018-19
|
Construction of 18m Long RCC Bridge on Panpatty UPC- Panpatty Bazar (Galachipa Kalikapur-Panpotty Launch Ghat) Road at Ch. 1500m under Galachipa Upazila, District: Patuakhali, (Road ID: 578573011)
|
DIRIP-2
|
galachipa
|
578573011
|
|
18.00
|
|
135.12
|
Shafiqur Rahman
|
128.36
|
10/06/2019
|
16/06/2020
|
16/06/2020
|
100
|
|
|
14/07/2020
|
|
176
|
DIRIP-II/UZR/Str-02/Patuakhali /2018-19
|
Construction of 22m Long RCC Bridge on Matibanga(RHD) -Char Biswas GC Road at Ch. 10420m
|
DIRIP-2
|
galachipa
|
578572002
|
|
22.00
|
|
165.30
|
M/S. Sonali Traders, S.D.O Road, Patuakhali.
|
157.30
|
21/01/2019
|
14/11/2019
|
14/11/2019
|
100
|
151.00
|
|
14/07/2020
|
|
177
|
DIRIP-2/UNR(Str)-20/Patuakhali/2018-19
|
Construction of 84m long RCC Bridge at Ch. 2303m on Amkhola UPC (Bhangra RHD)- Friday Hat Road under Galachipa Upazila District Patuakhali
|
DIRIP-2
|
galachipa
|
578573002
|
|
84.00
|
|
669.50
|
QC-KKE (JV), 177-Bijoy Nagar, Mahtab Center (12th Floor), Dhaka-1000.
|
669.52
|
07/07/2020
|
20/07/2020
|
07/07/2020
|
40
|
123.08
|
|
14/07/2020
|
|
178
|
DIRIP-2/Patua/Dash/M-01/2018-19 (238573)
|
Maintenance ofUlania GC-Patabunia GC via Chiknikandi UP Road (Ch.3500-5250m) (ID No. 578572006) (Galachipa)
|
DIRIP-2
|
galachipa
|
578572006
|
1.75
|
|
|
47.85
|
|
45.46
|
17/01/2019
|
24/07/2019
|
24/07/2019
|
100
|
47.85
|
|
13/07/2020
|
|
179
|
DIRIP-2/Patua/Gala/M-10/2018-19 (238582)
|
Maintenance of Galachipa UZHQ- Kalagachi GC Road.(Ch.17279-20000m) (ID No. 578572001) (Galachipa)
|
DIRIP-2
|
galachipa
|
578572001
|
2.72
|
|
|
125.08
|
M/S. Deip Enterprise, Town Kalikapur, Patuakhali.
|
136.34
|
21/01/2019
|
28/01/2020
|
28/01/2020
|
50
|
0.00
|
|
13/07/2020
|
|
180
|
DIRIP-2/UNR(Str)-12/Patuakhali/2018-19
|
Maintenance of Gilabaria Bazar-Kallan Kalos Bazer. Road (Ch.3635-5660m) (ID No. 578574203) (GalaMaintenence of Amkhola UPC (Vhangra RHD) - Friday Hat Road (Ch. 00-2450m) (ID No: 578573002) (Galachipa)
chipa)
|
DIRIP-2
|
galachipa
|
5578573002
|
2.45
|
22.00
|
|
112.26
|
M/S. Moniruzzaman Titu, Bazarghona, Marichbunia, South Sabujbag, Patuakhali.
|
106.65
|
21/01/2019
|
28/01/2020
|
28/01/2020
|
45
|
52.57
|
|
13/07/2020
|
|
181
|
DIRIP-2/Patua/Dash/M-14/2018-19 (238573)
|
Maintenence of Chandrail H/S - Chander Hat Road. (Ch. 1495-3150m) (ID No: 578574020) (Galachipa)
|
DIRIP-2
|
galachipa
|
578574020
|
1.65
|
|
|
85.40
|
M/S. Monira Enterprise, Kalaiya, Bauphal, Patuakhali.
|
81.13
|
21/01/2019
|
28/01/2020
|
28/01/2020
|
100
|
78.40
|
|
13/07/2020
|
|
182
|
DIRIP-2/Patua/Dash/M-15/2018-19 (238573)
|
Maintenance of Panpatty UPC- Panpatty Bazar Launch Ghat Ch 00-3112 m ID No. 578573011 under Galachipa Upazila District Patuakhali
|
DIRIP-2
|
galachipa
|
578573011
|
3.11
|
|
|
75.08
|
" M/S. Mamun Construction, Thanapara, Patuakhali. "
|
71.32
|
15/01/2020
|
21/04/2020
|
21/04/2020
|
25
|
50.93
|
|
13/07/2020
|
|
183
|
DIRIP-2/Patua/Dash/M-16/2018-19 (238573)
|
Maintenance of Charbiswas UPC- Nomo Sluice Bazar via Battala BazarCh 3000-7000 m ID No. 578573018 under Galachipa Upazila District Patuakhali
|
DIRIP-2
|
galachipa
|
578573018
|
4.00
|
|
|
287.74
|
M/S. K.K. Enterprise-M/S. Anowara & Sons- JVCA, Authorized Signatory: Md. Rimanul Islam, Word # 4, Arambag, Patuakhali.
|
246.13
|
02/04/2020
|
29/08/2020
|
29/08/2020
|
35
|
68.12
|
|
13/07/2020
|
|
184
|
DIRIP-2/Patua/Dash/M-17/2018-19 (238573)
|
Maintenance of Gazalia UPC - Amkhola UPC Ch 00-1020 m ID No. 578573027 under Galachipa Upazila District Patuakhali
|
DIRIP-2
|
galachipa
|
578573027
|
1.03
|
|
|
56.84
|
Shimanto Trading Agency, Latif School Road, Patuakhali.
|
54.00
|
27/01/2020
|
03/05/2020
|
03/05/2020
|
0
|
0.00
|
|
13/07/2020
|
|
185
|
DIRIP-2/Patua/Dash/M-18/2018-19 (238573)
|
Maintenance of Tatultala Bazar UZR-Ulania GC Ch 00-4610 m ID No. 578574206 under Galachipa Upazila District Patuakhali
|
DIRIP-2
|
galachipa
|
578574206
|
4.61
|
|
|
76.41
|
" Md. Shafiqul Islam, Natun Bazar, Word No-01, Galachipa, Patuakhali. "
|
72.59
|
16/02/2020
|
22/05/2020
|
22/05/2020
|
0
|
0.00
|
|
13/07/2020
|
|
186
|
DIRIP-2/Patua/Dash/M-19/2018-19 (238573)
|
Maintenance of Gabua Bridge RHD- Friday HatCh 00-6000 m ID No. 578574208 under Galachipa Upazila District Patuakhali
|
DIRIP-2
|
galachipa
|
578574208
|
6.00
|
|
|
129.89
|
M/S. Nishat Bilders, Marichbunia,Post-Marichbunia -8600, Patuakhali-Sadar,Patuakhali.
|
123.39
|
28/01/2020
|
26/05/2020
|
26/05/2020
|
0
|
0.00
|
|
13/07/2020
|
|
187
|
DIRIP-2/Patua/Dash/M-04/2018-19 (238573)
|
Maintenance of Galachipa UZHQ- Kalagachi GC Road.(Ch.00-3560m) (ID No. 578572001) (Galachipa)
|
DIRIP-2
|
galachipa
|
578572001
|
3.56
|
|
|
195.40
|
Md. Mizanur Alam, Town Kalikapur, Patuakhali.
|
212.46
|
21/01/2019
|
28/01/2020
|
28/01/2020
|
100
|
201.61
|
|
12/07/2020
|
|
188
|
DIRIP-2/UNR(Str)-06/Patuakhali/2018-19
|
Maintenance of Galachipa UZHQ- Kalagachi GC Road.(Ch.3560-7000m) (ID No. 578572001) (Galachipa)
|
DIRIP-2
|
galachipa
|
578572001
|
3.44
|
|
|
163.69
|
M/S. M.L Builders, Eidgah Sarak, Sabujbag, Patuakhali.
|
178.24
|
21/01/2019
|
28/01/2020
|
28/01/2020
|
100
|
169.00
|
|
12/07/2020
|
|
189
|
DIRIP-2/Patua/Dash/M-07/2018-19 (238573)
|
Maintenance of Galachipa UZHQ- Kalagachi GC Road.(Ch.7000-10500m) (ID No. 578572001) (Galachipa)
|
DIRIP-2
|
galachipa
|
578572001
|
3.50
|
|
|
167.61
|
Akash Enterprise, Chandkati, Kalishuri, Bauphal, Patuakhali.
|
186.95
|
21/01/2019
|
28/01/2020
|
28/01/2020
|
100
|
166.70
|
|
12/07/2020
|
|
190
|
DIRIP-2/Patua/Dash/M-08/2018-19 (238573)
|
Maintenance of Galachipa UZHQ- Kalagachi GC Road.(Ch.10500-13710m) (ID No. 578572001) (Galachipa)
|
DIRIP-2
|
galachipa
|
578572001
|
3.21
|
22.00
|
|
156.90
|
" Happy Construction Saubjbag, Patuakhali "
|
170.88
|
21/01/2019
|
28/01/2020
|
28/01/2020
|
100
|
161.33
|
|
12/07/2020
|
|
191
|
DIRIP-2/Patua/Dash/M-09/2018-19 (238573)
|
Maintenance of Galachipa UZHQ- Kalagachi GC Road.(Ch.13710-17279m) (ID No. 578572001) (Galachipa)
|
DIRIP-2
|
galachipa
|
578572001
|
3.57
|
|
|
180.73
|
M/S. Bhuya Construction, Thanapara, Patuakhali Sadar, Patuakhali.
|
196.32
|
21/01/2019
|
28/01/2020
|
28/01/2020
|
75
|
161.33
|
|
12/07/2020
|
|
192
|
DIRIP-2/UNR/BC-06/Patuakhali/2017-18(192073)
|
Improvement of Golkhali UPC -Naluabagi Bazar Road by BC (Ch. 3000-3500m), (ID: 578573022), (Galachipa)
|
DIRIP-2
|
galachipa
|
|
0.50
|
|
|
435.31
|
M/S SOMA ENTERPRISEOLD BASS TERMINAL ROAD PATUAKHALI
|
41.35
|
|
29/07/2018
|
04/05/2019
|
10
|
|
|
12/03/2019
|
|
193
|
GSIDP/PTK/DW-45
|
Improvement of Nurainpur Jame-E-Mosque, Union: Surjamani.[Latitude:22.4698, Longitude: 90.5597
|
GSIDP
|
bauphal
|
|
|
|
|
3.09
|
MD. Nurul Amin
|
2.93
|
|
|
|
0
|
|
|
07/04/2019
|
|
194
|
GSIDP/PTK/DW-46
|
Improvement of Boga Darus Sunnat Jame-E-Mosque, Union: Boga.[Latitude:22.4258, Longitude: 90.4653]
|
GSIDP
|
bauphal
|
|
|
|
|
5.69
|
M/S. Sithi Traders
|
5.41
|
29/01/2019
|
|
06/05/2019
|
70
|
|
|
07/04/2019
|
|
195
|
GSIDP/PTK/DW-47
|
Improvement of Kalaiya Bondor Eidgah Math , Union: Kalaiya.[Latitude:22.2340, Longitude: 90.3458 ]
|
GSIDP
|
bauphal
|
|
|
|
|
15.00
|
S.M Mijan
|
14.25
|
22/01/2019
|
|
28/04/2019
|
90
|
|
|
07/04/2019
|
|
196
|
GSIDP/PTK/DW-48
|
Improvement of Shinghera kati East side of Mirdha Bari Eidgah Field, Union: Kalisuri.[Latitude:22.5267, Longitude: 90.4816 ]
|
GSIDP
|
bauphal
|
|
|
|
|
5.62
|
M/S. Rubel Enterprise
|
5.34
|
29/01/2019
|
|
06/05/2019
|
0
|
|
|
07/04/2019
|
|
197
|
GSIDP/PTK/DW-49
|
Improvement of Kalaiya Rada Gobindo Mondir , Union: Kalaiya.[Latitude:22.2334, Longitude: 90.3527
|
GSIDP
|
bauphal
|
|
|
|
|
3.09
|
M/S. Khan Traders
|
2.94
|
29/01/2019
|
|
06/05/2019
|
50
|
|
|
07/04/2019
|
|
198
|
GSIDP/PTK/DW-51
|
Improvement of Late Choundu Mia house Jame-E-Mosque, Union: Bauphal. [Latitude:22.2538, Longitude: 90.3012 ]
|
GSIDP
|
bauphal
|
|
|
|
|
3.05
|
MD. Nurul Amin
|
2.89
|
|
|
|
0
|
|
|
07/04/2019
|
|
199
|
GSIDP/PTK/DW-54
|
Improvement of Kalisuri Digree College Field, Union: Kalisuri.[Latitude:22.5330, Longitude: 90.5196 ]
|
GSIDP
|
bauphal
|
|
|
|
|
3.00
|
Sikder Traders
|
2.85
|
31/01/2019
|
|
08/05/2019
|
0
|
|
|
07/04/2019
|
|
200
|
GSIDP/PTK/DW-55
|
Improvement of Bilbilash Amir Molla Bari Jame-E-Mosque, Union: Kalaiya. [Latitude:22.2448, Longitude: 90.3111 ]
|
GSIDP
|
bauphal
|
|
|
|
|
3.02
|
M/S. Safiqul Enterprise
|
2.87
|
|
|
|
0
|
|
|
07/04/2019
|
|
201
|
GSIDP/PTK/DW-1
|
Improvement of Kalu Mollah hat Jam-E-Mosque, Union: Baharampur.[Latitude:22.169564, Longitude: 90.474580.]
|
GSIDP
|
dashmina
|
|
|
|
|
6.00
|
MD Anower Hossain
|
5.70
|
|
|
|
0
|
|
|
|
|
202
|
GSIDP/PTK/DW-2
|
Improvement of Bashbaria Launch gate Jam-E-Mosque, Union: Bashbaria.[Latitude:22.189674, Longitude: 90.484585.]
|
GSIDP
|
dashmina
|
|
|
|
|
7.00
|
MD. Abu taher
|
6.65
|
|
|
|
0
|
|
|
|
|
203
|
GSIDP/PTK/DW-3
|
Improvement of PaglaBazer Jam-E-Mosque, Union: Char Borhan. [Latitude:22.178474, Longitude: 90.569018.]
|
GSIDP
|
dashmina
|
|
|
|
|
7.00
|
Mrs. Rahima Traders
|
6.65
|
|
|
|
0
|
|
|
|
|
204
|
GSIDP/PTK/DW-4
|
Improvement of Noalkhola Bazar Shasan, Union: Dashmina.[Latitude:22.345684, Longitude: 90.567180.]
|
GSIDP
|
dashmina
|
|
|
|
|
3.00
|
MD. Abu taher
|
2.85
|
|
|
|
0
|
|
|
|
|
205
|
GSIDP/PTK/DW-5
|
Improvement of Alipur Hat Jam-E-Mosque, Union: Alipur.[Latitude:22.189681, Longitude: 90.484509.]
|
GSIDP
|
dashmina
|
|
|
|
|
6.00
|
MD Anower Hossain
|
5.70
|
|
|
|
0
|
|
|
|
|
206
|
GSIDP/PTK/DW-6
|
Improvement of Auliapur Hat Jam-E-Mosque, Union: Rangopaldi.[Latitude:22.189674, Longitude: 90.484585.]
|
GSIDP
|
dashmina
|
|
|
|
|
6.00
|
MD Anower Hossain
|
5.70
|
|
28/06/2018
|
29/09/2018
|
100
|
|
|
|
|
207
|
GSIDP/PTK/DW-7
|
Improvement of Arojbegi Jam-E-Mosque, Union: Dashmina.[Latitude:22.244957Longitude: 90.5555.]
|
GSIDP
|
dashmina
|
|
|
|
|
6.00
|
MD. Abu taher
|
5.70
|
|
|
|
0
|
|
|
|
|
208
|
GSIDP/PTK/DW-8
|
Improvement of Thakurer hat Jam-E-Mosque, Union: Dashmina. [Latitude: 22.334240,Longitude: 90.515820.]
|
GSIDP
|
dashmina
|
|
|
|
|
6.00
|
Mrs. Rahima Traders
|
5.70
|
|
|
|
0
|
|
|
|
|
209
|
GSIDP/PTK/DW-11
|
Improvement of Gilabaria Bazer Jame-E-Mosque, Union: Kalagachia.[Latitude:22.282, Longitude: 90.4836]
|
GSIDP
|
galachipa
|
|
|
|
|
3.00
|
Md. Basir Uddin
|
2.85
|
|
|
|
0
|
|
|
|
|
210
|
GSIDP/PTK/DW-12
|
Improvement of Dhalu Fakir hat Jame-E-Mosque, Union: Bakulbaria.[Latitude:22.3393, Longitude: 90.4742]
|
GSIDP
|
galachipa
|
|
|
|
|
3.00
|
M/S. Gazi Construction
|
2.85
|
|
|
|
0
|
|
|
|
|
211
|
GSIDP/PTK/DW-13
|
Improvement of Pankhali Bazer Jame-E-Mosque, Union: Chiknikandi.[Latitude:22.2327, Longitude: 90.4549]
|
GSIDP
|
galachipa
|
|
|
|
|
4.00
|
Saidin islam Traders,
|
3.85
|
|
|
|
0
|
|
|
|
|
212
|
GSIDP/PTK/DW-14
|
Improvement of Nomor Sluice Bazer Jame-E-Mosque, Union: Charbiswash.[Latitude: 21.9986, Longitude: 90.5253]
|
GSIDP
|
galachipa
|
|
|
|
|
3.00
|
M/S. Arabe Enterprose
|
2.85
|
|
|
|
0
|
|
|
|
|
213
|
GSIDP/PTK/DW-15
|
Improvement of Ichadi Chander Hat Jame-E-Mosque, Union: Gazalia.[Latitude:22.2483, Longitude: 90.3933]
|
GSIDP
|
galachipa
|
|
|
|
|
3.00
|
M/S. Gazi Construction
|
2.85
|
|
|
|
0
|
|
|
|
|
214
|
GSIDP/PTK/DW-87
|
Improvement of Purbo Subidkhali Jame Mosque,Union: Dewli Subidkhali .[Latitude: 22.5310,Longitude:90.2650]
|
GSIDP
|
mirjaganj
|
|
|
|
|
5.00
|
M/S. Bepari Traders
|
4.75
|
20/03/2019
|
|
26/06/2019
|
0
|
|
|
07/04/2019
|
|
215
|
GSIDP/PTK/DW-89
|
Improvement of Pochim Sucidkhali Ased Houlader Jame Mosque,Union : Dewli Subidkhali.[Latitude; 22.5415,Longitude: 90.2745]
|
GSIDP
|
mirjaganj
|
|
|
|
|
3.00
|
M/S. Safiqul Enterprise
|
2.85
|
|
|
|
0
|
|
|
07/04/2019
|
|
216
|
GSIDP/PTK/SDW-94
|
Improvement of Sree Sree Radha Krisno Mondir Union : Amragachia.[ Latitude: 22.553,Longitude: 90.285]
|
GSIDP
|
mirjaganj
|
|
|
|
|
5.00
|
|
0.00
|
|
|
|
0
|
|
|
07/04/2019
|
|
217
|
GSIDP/PTK/SDW-31
|
Improvement of Jhatibunia Hossan Ali Houlader Bari Jame Mposque, Union: Amragachia [Latitude: 22.4122, Longitude: 90.2465.]
|
GSIDP
|
mirjaganj
|
|
|
|
|
10.00
|
MD. Jahirul Islam
|
95.00
|
02/12/2018
|
|
09/03/2018
|
75
|
|
|
04/04/2019
|
|
218
|
GSIDP/PTK/SDW-32
|
Improvement of Purbo Subidkhali Katun Zannat Madrasha front Jame Mposque, Union:Dewli Subidkhali [ Latitude: 22.3479, Longitude: 90.2111.]
|
GSIDP
|
mirjaganj
|
|
|
|
|
10.00
|
M/S. Patuakhali Hardware,
|
95.00
|
27/11/2018
|
|
26/02/2019
|
30
|
|
|
04/04/2019
|
|
219
|
GSIDP/PTK/SDW-33
|
Improvement of Hazi Asmoth Ali Jame Mposque, Union: Madafkhali [ Latitude: 22.35542, Longitude: 90.55026.]
|
GSIDP
|
mirjaganj
|
|
|
|
|
1.83
|
M/S. Mahmuda Enterprise
|
1.74
|
13/12/2018
|
|
20/03/2019
|
0
|
|
|
04/04/2019
|
|
220
|
GSIDP/PTK/SDW-63
|
Improvement of sharik khali Esahak Houladerbari Jame Mposque,union : Itabaria [Latitude:22.356305,Longitude:90.296827.]
|
GSIDP
|
patuakhali-s
|
|
|
|
|
8.53
|
Msdohaenterprise
|
8.10
|
|
|
|
0
|
|
|
07/04/2019
|
|
221
|
GSIDP/PTK/DW-70
|
Improvement of Uttar Dhaukhali Al Modina Jame -E-Mosque,Union: Uttar Lawkathi.[Latitude: 22.388257,Longitude: 90.351195]
|
GSIDP
|
patuakhali-s
|
|
|
|
|
3.24
|
Md. Matbor Enterprise
|
3.08
|
|
|
|
0
|
|
|
07/04/2019
|
|
222
|
GSIDP/PTK/DW-71
|
Improvemend Of sirajul Haque Mounshi Barri Jame -E-Mosque,Union: Patuakhali Sadar Pourashava.[ Latitude: 22.377829,Longitude: 90.361195]
|
GSIDP
|
patuakhali-s
|
|
|
|
|
3.01
|
Md. Khabir Sikder
|
2.86
|
|
|
|
0
|
|
|
07/04/2019
|
|
223
|
GSIDP/PTK/DW-72
|
Improvement of Auliapur Khash Howlade rJnnatul Jame-E-Mosque,Union : Patudkhali Sadar .[ Latitude: 22.285278,Longitude: 90.50351205]
|
GSIDP
|
patuakhali-s
|
|
|
|
|
3.33
|
Md. Matbor Enterprise
|
3.16
|
|
|
|
0
|
|
|
07/04/2019
|
|
224
|
GSIDP/PTK/DW-73
|
Improvement of Sabujbag Jame -E-Mosque Union : Patuakhali Sadar Pourashava.[ Laitutde: 22.355243,Longitude: 90.341972]
|
GSIDP
|
patuakhali-s
|
|
|
|
|
5.21
|
M/S. Bosir Enteprise
|
4.95
|
17/03/2019
|
|
05/07/2019
|
0
|
|
|
07/04/2019
|
|
225
|
GSIDP/PTK/DW-74
|
Improvement of Dakhin Dharandi Dewanshaha Mazar jame -E-Mosque,Union : Kamlapur ,[Latitude: 22.318695,Longitude: 90.448888]
|
GSIDP
|
patuakhali-s
|
|
|
|
|
3.00
|
M/S. Najmus Shahadat Traders
|
2.85
|
17/03/2019
|
|
26/06/2019
|
40
|
|
|
07/04/2019
|
|
226
|
GSIDP/PTK/DW-75
|
Improvement of Paschim DhaukhaliGazi Bari jame -E-Mosque,Union :Lawkathi .[ Latitude: 22.390360,Longitude; 90.344700]
|
GSIDP
|
patuakhali-s
|
|
|
|
|
3.00
|
A.K.M Moniruzzaman
|
2.85
|
17/03/2019
|
|
26/06/2019
|
0
|
|
|
07/04/2019
|
|
227
|
GSIDP/PTK/DW-76
|
Improvement of Nasrullah Shikder Bari Graveyards Union : Chotobighai [ Latitude: 22.321668,Longitude: 90.228248]
|
GSIDP
|
patuakhali-s
|
|
|
|
|
3.00
|
Mrs. Rahima Traders
|
2.85
|
|
|
|
0
|
|
|
07/04/2019
|
|
228
|
GSIDP/PTK/DW-77
|
Improvement of Lohalia Up mujaffor Ali Mredha Bari Jaem - E-Mosque,Union : Lohalia.[Latitude: 22.373928,Longitude:90.382258]
|
GSIDP
|
patuakhali-s
|
|
|
|
|
3.00
|
M/S. Mahmuda enterprise
|
2.85
|
17/03/2019
|
|
25/06/2019
|
0
|
|
|
07/04/2019
|
|
229
|
GSIDP/PTK/DW-78
|
Improvement of Tangrakhali Darbar Sharif Jame-E-Mosque,Union :Badorpur.[ Latitude: 22.37528,Longitude: 90.304915]
|
GSIDP
|
patuakhali-s
|
|
|
|
|
7.91
|
Md.Bachchu Mia
|
7.51
|
|
|
|
0
|
|
|
07/04/2019
|
|
230
|
GSIDP/PTK/DW-79
|
Improvement of Haji Abdul Karim Khan Gravyard,Union: Badorpur [ Latitude: 22.437445,Longitude: 90.339472]
|
GSIDP
|
patuakhali-s
|
|
|
|
|
8.73
|
M/S. Arun Builders
|
8.29
|
17/03/2019
|
|
26/06/2019
|
0
|
|
|
07/04/2019
|
|
231
|
GSIDP/PTK/DW-80
|
Improvement of Amjad Ali Khan Bari Jame-E-Mosque Cemetery,Union: Kamalpur [Latitude: 22.3055,Longitude:90.4084]
|
GSIDP
|
patuakhali-s
|
|
|
|
|
4.18
|
Shimanto Trading Agency
|
3.97
|
20/03/2019
|
|
28/06/2019
|
15
|
|
|
07/04/2019
|
|
232
|
GSIDP/PTK/DW-83
|
Improvement of Nazir Mollahbarir Gravyards,Union; Longalia [Latitude; 22.360067,Longitude: 90.377540]
|
GSIDP
|
patuakhali-s
|
|
|
|
|
3.02
|
M/S. Najmus Shahadat Traders
|
2.87
|
20/03/2019
|
|
26/07/2019
|
35
|
|
|
07/04/2019
|
|
233
|
GSIDP/PTK/DW-84
|
Improvement of Kasisera Muktizoodha Nasir Uddin Biswas Jam-E-Mosque,Union: Itbaria [Latitude: 22.386980,Longitude: 90.286807]
|
GSIDP
|
patuakhali-s
|
|
|
|
|
5.20
|
M/S. Bepari Traders
|
4.94
|
20/03/2019
|
|
26/06/2019
|
30
|
|
|
07/04/2019
|
|
234
|
GSIDP/PTK/DW-85
|
Improvement of Bottola jam-E-Mosque,Union;Lalikapur [ Latitude: 22.352453,Longitude: 90.32330]
|
GSIDP
|
patuakhali-s
|
|
|
|
|
3.37
|
M/S. South Bengal Engineers
|
3.21
|
12/03/2019
|
|
19/06/2019
|
10
|
|
|
07/04/2019
|
|
235
|
GSIDP/PTK/DW-88
|
Improvement of Bangladesh Sebaasrom Radha Gobindo Mondir Union: Mirjagonj.[Latitude: 22.531,Longitude:90.268]
|
GSIDP
|
patuakhali-s
|
|
|
|
|
3.00
|
M/S. Adarso Enterprise
|
2.85
|
20/03/2019
|
|
28/06/2019
|
0
|
|
|
07/04/2019
|
|
236
|
GSIDP/PTK/SDW-90
|
Improvement of Hazi Asmoth All Eidgha Bazita,Union: Madhobkhali.[ Latitude : 22.36455,Longitude: 90.565028]
|
GSIDP
|
patuakhali-s
|
|
|
|
|
13.20
|
M/S. Tajin Enterprise
|
12.54
|
|
|
|
0
|
|
|
07/04/2019
|
|
237
|
GSIDP/PTK/DW-86
|
Improvement of Nazirpur Fazlu Karim Mredhabari Jam-E-mosque,Union: Lohalia [Latitude; 22.382078,Longitude: 90.37975]
|
GSIDP
|
patuakhali-s
|
|
|
|
|
5.06
|
|
0.00
|
|
|
|
0
|
|
|
07/04/2019
|
|
238
|
GSIDP/PTK/SDW-92
|
Improvement of Sreerampur Bazar Jame mosque ,Union : Lawkathi .[ Latitude: 22.4179,Longitude: 90.3705]
|
GSIDP
|
patuakhali-s
|
|
|
|
|
6.07
|
|
0.00
|
|
|
|
0
|
|
|
07/04/2019
|
|
239
|
GSIDP/PTK/SDW-93
|
Improvement of Char Gobordi baitul Aman Jame Mosque,Union :Muradia [ Latitude :22.422888,Longitude:90.44657666
|
GSIDP
|
patuakhali-s
|
|
|
|
|
8.99
|
|
0.00
|
|
|
|
0
|
|
|
07/04/2019
|
|
240
|
GSIDP/PTK/SDW-99
|
Improvement of Pukurjana Boro Khan Bari Jame Mosqeu Union : Itbaria .[ Latitude: 22.403492,Longitude: 90.299537]
|
GSIDP
|
patuakhali-s
|
|
|
|
|
5.06
|
|
0.00
|
|
|
|
0
|
|
|
07/04/2019
|
|
241
|
GSIDP/PTK/SDW-100
|
Improvement of Mia Bari Jame Mosque Union : Loukathgi .[ Latitude: 22.4255,Longitude: 90.3729]
|
GSIDP
|
patuakhali-s
|
|
|
|
|
4.74
|
|
0.00
|
|
|
|
0
|
|
|
07/04/2019
|
|
242
|
GSIDP/PTK/SDW-101
|
Improvement of West Bhuria Houlader bari Jame Mosque Union : Kamalpur. [ Latitude: 22.3665,Longitude: 90.4018]
|
GSIDP
|
patuakhali-s
|
|
|
|
|
3.37
|
|
0.00
|
|
|
|
0
|
|
|
07/04/2019
|
|
243
|
GSIDP/PTK/SDW-102
|
Improvement of Charhali Khondokar Bari Jame Mosque Union : Dewlisubidkhali . Latitude : 22.5310,Longitude: 90.2650]
|
GSIDP
|
patuakhali-s
|
|
|
|
|
6.91
|
|
0.00
|
|
|
|
0
|
|
|
07/04/2019
|
|
244
|
GSIDP/PTK/DW-50
|
Improvement of Brammoner Bill Kali Mondir , Union: : Kanakdia.[Latitude:22.4843, Longitude: 90.4756 ]
|
GSIDP
|
patuakhali-s
|
|
|
|
|
3.00
|
Matraders
|
2.85
|
29/01/2019
|
|
06/05/2019
|
0
|
|
|
07/04/2019
|
|
245
|
GSIDP/PTK/SDW-62
|
Improvement of Kazibari Jame Mqosque,Union:Lawkarhi {Latitude:22.4299,Longitude:90.3421.]
|
GSIDP
|
patuakhali-s
|
|
|
|
|
5.97
|
M/S. Zakir Enterprise
|
5.67
|
|
|
|
0
|
|
|
04/04/2019
|
|
246
|
GSIDP/PTK/SDW-9
|
Improvement of Moukaron Cemetery, Union: lowkathi.Latitude :224297, Longitude :903424.
|
GSIDP
|
patuakhali-s
|
|
|
|
|
12.10
|
M/S. Jahedul Traders
|
11.50
|
|
30/07/2018
|
30/10/2018
|
0
|
|
|
|
|
247
|
GSIDP/PTK/DW-10
|
Improvement of Purbo Auliapur Baitul Falah Jame Mposque, Union: Auliapur [ Latitude: 22.304165, Longitude: 90.363690.]
|
GSIDP
|
patuakhali-s
|
|
|
|
|
14.00
|
M/S.Ahamed Construction
|
13.30
|
|
|
|
0
|
|
|
|
|
248
|
IBRP/Patua/Mirza/Brg-01
|
Construction of 12.0m Long RCC Girder Bridge Mahiskata Muchibari Bridge-Bazita High School via. Beparibari. Road (East side & Bazita high school) at Ch 2100m
|
IBRP
|
mirjaganj
|
578764058
|
|
12.00
|
92
|
148.90
|
M/S S H Enterprise
|
124.55
|
09/11/2019
|
23/11/2019
|
17/09/2020
|
80
|
114.27
|
92
|
21/07/2020
|
|
249
|
IBRP/Patua/Mirza/Brg-02
|
Construction of 96.0m Long RCC Girder Bridge on Dahkin Jattibunia RHD via H/O Salam Master bari-RHD road (Infront of jattibunia high school) at Ch 0+000m
|
IBRP
|
mirjaganj
|
578765133
|
|
96.00
|
33
|
1120.97
|
M/S Kohinoor Enterprise
|
1102.98
|
09/11/2019
|
23/11/2019
|
17/09/2020
|
40
|
369.07
|
33
|
21/07/2020
|
|
250
|
IBRP/Patua/Mirza/Brg-03
|
Construction of 18.0m Long RCC Girder Bridge RHD (Monasep Sikder Bari) - UZR ( West side Bazita Arshed Dr. Bari) Road via Karikorbari,at Ch 1100m
|
IBRP
|
mirjaganj
|
578764023
|
|
18.00
|
53
|
141.85
|
M/S. Sifat Enterprise
|
124.03
|
09/11/2019
|
23/11/2019
|
17/09/2020
|
60
|
66.35
|
53
|
21/07/2020
|
|
251
|
IBRP/Patua/Mirza/Brg-4
|
Construction of 14.0m Long RCC Girder Bridge on New market R&H- dargabari hat Road via Shishurhat at Ch 1769m
|
IBRP
|
mirjaganj
|
578764021
|
|
14.00
|
58
|
113.10
|
M/S. Sifat Enterprise
|
97.90
|
09/11/2019
|
23/11/2019
|
17/09/2020
|
65
|
56.57
|
58
|
21/07/2020
|
|
252
|
IBRP/Patua/Mirza/Brg-05
|
Construction of 11.0m Long RCC Girder Bridge Mahiskata Muchibari Bridge-Bazita High School via. Beparibari. Road, at Ch 2450m
|
IBRP
|
mirjaganj
|
578764058
|
|
11.00
|
95
|
91.90
|
M/S Khan Enterpris
|
78.43
|
09/11/2019
|
23/11/2019
|
17/09/2020
|
98
|
75.05
|
95
|
21/07/2020
|
|
253
|
PATBAU171801
|
Improvement of Sabupura Bazar Rajnagar Khal under Bauphal Upazila at Patuakhali district
|
IPCP
|
bauphal
|
|
5.14
|
|
|
109.50
|
M/S Rony Enterprise.
|
104.03
|
|
|
|
0
|
|
|
|
|
254
|
IRIDP-2/PTK/DW-123
|
Improvement of Kalisuri Vasai Mredha house-(Munshur President new house)-South Mankham Bridge road (ch.00-390m) ID. No.578385121
|
IRIDP-2
|
bauphal
|
578385121
|
0.39
|
|
|
19.91
|
Md. Zashim Uddin Talukder
|
19.50
|
22/06/2017
|
|
24/01/2019
|
68
|
|
|
09/05/2019
|
|
255
|
IRIDP-2/PTK/DW-134
|
Improvement of Kalisuri-Baherchar UZR-Baherchar Bazar Via Sighar Khati Abdul Khalek Merdha House (ch.1000m-1500m) ID. No. 578384069 0 0 0 1,871,009.00 1,777,458.55 0
|
IRIDP-2
|
bauphal
|
578384069
|
0.50
|
|
|
18.71
|
M/S. Authoye Construction
|
17.77
|
|
|
|
0
|
|
|
09/05/2019
|
|
256
|
IRIDP-2/PTK/DW-170
|
(a)Improvement of Bauphal Boga RHD Road Afsarer Grage West Side To Dipasha Bazar (Via SP house) road (ch.00m-450m) ID. No. (b) Construction of 01no 1.00mx1.00m culvert at ch.200m on the same road
|
IRIDP-2
|
bauphal
|
578384328
|
0.45
|
1.00
|
|
21.36
|
M/S. Gazi Construction
|
20.29
|
09/10/2018
|
|
16/02/2019
|
10
|
|
|
09/05/2019
|
|
257
|
IRIDP-2/PTK/DW-171
|
Improvement of Kalisuri Baherchar UZR-Kalisuri Baherchar UNR Via Rashid Chowkider & Khalek Kondokar Bari road (ch.00m-400m)
|
IRIDP-2
|
bauphal
|
578384278
|
0.40
|
|
|
15.97
|
M/S. Gazi Construction
|
15.17
|
09/10/2018
|
|
16/02/2019
|
50
|
|
|
09/05/2019
|
|
258
|
IRIDP-2/PTK/DW-172
|
Improvement of Manderbon Eidgha To Karkhana (High School) Pacca Road Via East Side of Shahin Fakir House ( Kachipara Karkhana BC road – Sahin Fakir House road) road (ch.00m-170m)
|
IRIDP-2
|
bauphal
|
578384174
|
0.17
|
|
|
10.10
|
M/S. Gazi Construction
|
9.60
|
09/10/2018
|
|
16/02/2019
|
0
|
|
|
09/05/2019
|
|
259
|
IRIDP-2/PTK/DW-174
|
Improvement of Modonpura Sonamuddin High School-East Side Of Modonpura Board GPSroad (ch.640m-1000m)
|
IRIDP-2
|
bauphal
|
578384204
|
0.36
|
|
|
21.71
|
M/S. Gazi Construction
|
20.62
|
09/10/2018
|
|
16/02/2019
|
55
|
|
|
09/05/2019
|
|
260
|
IRIDP-2/PTK/DW-175
|
(a)Improvement of Sharif Bari Bridge-Aroary now GPS-House Of Mayor Heron-Patilapar Hatem Ali GPS.road (ch.850m-1450m) ID. No. 578384144(b)Construction of 01no 1.00mx1.00m culvert at ch.950m on the same road
|
IRIDP-2
|
bauphal
|
578384144
|
0.60
|
1.00
|
|
27.57
|
M/S. Gazi Construction
|
26.19
|
09/10/2018
|
|
16/02/2019
|
10
|
|
|
09/05/2019
|
|
261
|
RIDP-2/PTK/DW-176
|
(a)Improvement of Kanakdia Kasipara UNR - (Basa Bari Bridge)-Kiratul Quran Madrasha Via Sipahi Bari Dhakil Madrasha.road (ch.00m-700m) ID. No. (b) Construction of 01no 0.625mx0.60m culvert at ch.250m on the same road
|
IRIDP-2
|
bauphal
|
578385220
|
0.70
|
0.62
|
|
28.54
|
Md. Hemayet Uddin
|
27.11
|
09/10/2018
|
|
16/02/2019
|
60
|
|
|
09/05/2019
|
|
262
|
IRIDP-2/PTK/DW-182
|
Improvement of Kalaiya Bazar.
|
IRIDP-2
|
bauphal
|
|
|
|
|
131.14
|
M/S. Akon Enterprise
|
124.58
|
09/10/2018
|
|
15/04/2019
|
88
|
|
|
09/05/2019
|
|
263
|
IRIDP-2/PTK/DW-193
|
Improvement of Kalisuri Baherchar UZR- Kalisuri Gopalia via khalek Merdha House (ch.00m-500m) 0
|
IRIDP-2
|
bauphal
|
578384232
|
0.50
|
|
|
18.77
|
MS Ali Traders
|
17.83
|
|
|
|
0
|
|
|
09/05/2019
|
|
264
|
IRIDP-2/PTK/DW-127
|
Improvement of Mominpur Kalaiya UZR-Voripasha High School Road (ch.00-500m) ID. No.578385124
|
IRIDP-2
|
bauphal
|
578385124
|
0.50
|
|
|
27.00
|
Md. Abdul Aziz Molla
|
26.78
|
31/08/2017
|
|
20/11/2018
|
100
|
|
|
07/05/2019
|
|
265
|
IRIDP-2/PTK/DW-173
|
(a)Improvement of Kachipara-(Health Complex) - Joybangla Bazar-Eidgha Mat -Maderbon Bazar.road (ch.400m-760m) ID. No. (b)Construction of 01no 1.00mx1.00m culvert at ch.550m on the same road 578384110
|
IRIDP-2
|
bauphal
|
578384110
|
0.36
|
1.00
|
|
16.59
|
Md. Hemayet Uddin
|
15.76
|
09/10/2018
|
|
05/02/2019
|
100
|
|
|
07/05/2019
|
|
266
|
IRIDP-2/PTK/DW-177
|
(a)Improvement of Momenpur GC Kalayua GC road via Basar Khan House via Buher hat Road (ch.00m-1000m) ID. No. (b) Construction of 02no 0.625mx0.60m culvert at ch.250m ,410m on the same road 578385244
|
IRIDP-2
|
bauphal
|
578385244
|
1.00
|
1.25
|
|
41.21
|
Md. Mahbubur Rahman
|
39.15
|
09/10/2018
|
|
14/02/2019
|
100
|
|
|
07/05/2019
|
|
267
|
IRIDP-2/PTK/DW-178
|
Improvement of North Madobpur Durga Mondir-Sorgio Nisikanto Sorkar Bari Road (ch.00m-335m) ID. No. 578385143
|
IRIDP-2
|
bauphal
|
578385143
|
0.34
|
|
|
13.49
|
M/S. Deip Enterprise
|
12.82
|
09/10/2018
|
|
15/02/2019
|
100
|
|
|
07/05/2019
|
|
268
|
IRIDP-2/PTK/DW-180
|
Improvement of Kashabpur Mominpur Road-Dr.Moklesur Rhaman House Road (ch.00m-360m) ID. No. 578385123 & Mosque link. 90.0m
|
IRIDP-2
|
bauphal
|
578385123
|
0.45
|
|
|
17.04
|
M/S. Gazi Construction
|
16.19
|
09/10/2018
|
|
07/01/2019
|
100
|
|
|
07/05/2019
|
|
269
|
IRIDP-2/PTK/DW-25
|
Improvement of Nowmala Nogorer Hat – Hospital – Alea Rahman Ladish GPS Road (Ch.00-600m).
|
IRIDP-2
|
bauphal
|
578385130
|
0.60
|
|
|
25.91
|
Md. Firoz
|
21.95
|
15/03/2016
|
|
25/03/2019
|
100
|
|
|
07/05/2019
|
|
270
|
IRIDP-2/PTK/DW-114
|
(a) Improvement of Voripasha Khaya Ghat-Morhum Md.Dalil Uddin Master House Via Chowmohoni Bazar & Merdhar Hatroad (ch.00m-1500m) ID. No.578384304(b) Construction of 04no. 0.625mx0.60m culvert at ch.855m,965m,1255m&1385m on the same road.
|
IRIDP-2
|
bauphal
|
578384304
|
1.50
|
2.25
|
|
82.33
|
Md. Abdul Aziz Molla
|
74.10
|
19/06/2017
|
|
28/12/2018
|
100
|
|
|
07/05/2019
|
|
271
|
IRIDP-2/PTK/DW-125
|
(a) Improvement of Boga-Baherchar GC road (Shaid Jalal GPS)- South side of Siddiq Master House Road (ch.00m-500m) ID. No.(b) Construction of 01no. 0.625mx0.60m culvert at ch.300m on the same road. 578385128
|
IRIDP-2
|
bauphal
|
578385128
|
0.50
|
0.62
|
|
28.61
|
Md. Mizanur Alam
|
28.23
|
31/08/2017
|
|
06/03/2018
|
100
|
|
|
07/05/2019
|
|
272
|
IRIDP-2/PTK/DW-128
|
(a) Improvement of Bauphal Dasmina R&H (Hasan Siddik High School) West Site Of kabale House Road.Road (ch.00m-1148m) ID. No.578384208 & Hasan Siddik High School. Link 124m(b) Construction of 04no. 0.625mx0.60m culvert at ch.350m,630m,720m,840m on the same road.
|
IRIDP-2
|
bauphal
|
578384208
|
1.27
|
2.50
|
|
73.11
|
Brothers Treding, Pro. Md. Al-Amin Sikder
|
68.46
|
22/06/2017
|
|
25/03/2018
|
100
|
|
|
07/05/2019
|
|
273
|
IRIDP-2/PTK/DW-190
|
Improvement of Birpasa Tatultola – Satrokanda GPS road (ch.00m-300m) ID. No. 578385620 0 0 0 1,335,787.00 03 Feb 2019 1,268,997.65 10 May 2019 27 Feb 2019 100
|
IRIDP-2
|
bauphal
|
578385620
|
0.30
|
|
|
13.35
|
M/S. Safiqul Enterprise
|
12.68
|
03/02/2019
|
|
10/05/2019
|
100
|
|
|
07/05/2019
|
|
274
|
IRIDP-2/PTK/DW-20
|
a) Improvement of Hosnabad Bazar – Dakhil Madrasha to Kaguji Bari Bazar via Alauddin Gazi Bari JameMosque Road (Ch. 500-1340m). b) Construction of 2Nos 0.625x0.600m Culvert on Same Road at Ch. 1021m & 1126m.
|
IRIDP-2
|
bauphal
|
578384286
|
0.84
|
1.25
|
|
37.51
|
Md. Akhtaruzzaman
|
31.45
|
09/02/2016
|
|
30/12/2017
|
45
|
|
|
07/05/2019
|
|
275
|
IRIDP-2/PTK/DW-24
|
Improvement of Botkajol Board GPS – Nowmala UPC via Muslimpara Jame Mosque Road (Ch.00-780m). 30
|
IRIDP-2
|
bauphal
|
578385144
|
0.78
|
|
|
33.69
|
Md. Firoz
|
28.50
|
09/03/2016
|
|
30/06/2019
|
30
|
|
|
07/05/2019
|
|
276
|
IRIDP-2/PTK/DW-102
|
(a) Improvement of Bauphal-Kalisuri R&H(Chandrapara Jorpool) Dhali Asia Khatun Dhakil Madrasha (ch.00-1300m) ID. No.578384203(b) Construction of 02no 1.0mx1.0m culvert at ch.660m& 1080m on the same road
|
IRIDP-2
|
bauphal
|
578384203
|
1.30
|
2.00
|
|
76.47
|
M/S. Zakir Enterprise
|
68.83
|
30/08/2017
|
|
31/12/2018
|
35
|
|
|
07/05/2019
|
|
277
|
IRIDP-2/PTK/DW-106
|
(a) Improvement of Joybangla Bazar - Manderbon Bazer Via Pakdal Post Office road (ch.00-800m) ID. No.578384136(b) Construction of 01no. 1.0mx1.0m culvert at ch.375m on the same road(c) Construction of 01no. 0.625mx0.60m culvert at ch.75m on the same road
|
IRIDP-2
|
bauphal
|
578384136
|
0.80
|
1.62
|
|
46.89
|
Md. Zashim Uddin Talukder
|
44.48
|
18/06/2017
|
|
24/01/2019
|
70
|
|
|
07/05/2019
|
|
278
|
IRIDP-2/PTK/DW-112
|
(a) Improvement of Olipura Nowmala UNR Road-Nowmala BDC Bazar Via Md.Edrish Moll House-Sagor Ali Chowkidar House road (ch.1455m-2455m) ID. No. (b) Construction of 02no. 1.0mx1.0m culvert at ch.1535m&2385m on the same road
|
IRIDP-2
|
bauphal
|
578384165
|
1.00
|
2.00
|
|
59.27
|
Md. Iqbal Hossain
|
55.94
|
19/06/2017
|
|
30/05/2019
|
75
|
|
|
07/05/2019
|
|
279
|
IRIDP-2/PTK/DW-7
|
Improvement of Dalapara – Moominpur GC – Kalisuri GC- Baherchar GC-Dalapara Anis Maliker Barir Pucca Road to Ponahura Kalikumar Bari via Sulice Gate Road (Ch. 00-500m).
|
IRIDP-2
|
bauphal
|
578384130
|
0.50
|
|
|
21.59
|
Rezwanul Maksud
|
20.91
|
06/03/2016
|
|
21/05/2017
|
100
|
|
|
06/05/2019
|
|
280
|
IRIDP-2/PTK/DW-8
|
Improvement of Purbo Rajapur Digirpar Bridge – west side of Gosai Kabiraj house Road to Ponahura Kalikumar Bari via Sulice Gate Road (Ch. 00-800m).
|
IRIDP-2
|
bauphal
|
578384184
|
0.80
|
|
|
34.55
|
Md. Shamim Ahsan
|
30.76
|
21/02/2016
|
|
02/01/2017
|
100
|
|
|
06/05/2019
|
|
281
|
IRIDP-2/PTK/DW-9
|
a) Improvement of Matobber hat (South Side of Gias Mredha House) via North Rajapur GPS road (Ch. 00-500m). b) Construction of 2Nos 0.625x0.600m Culvert on Same Road at Ch. 400m & 450m.
|
IRIDP-2
|
bauphal
|
578384188
|
0.50
|
1.25
|
|
22.82
|
Md. Abdul Aziz Molla
|
20.63
|
18/02/2016
|
|
06/08/2016
|
100
|
|
|
06/05/2019
|
|
282
|
IRIDP-2/PTK/DW-10
|
a) Improvement of Bauphal H/Q Kalisuri RHD – Surjamoni – Kalisuri – UZR Connecting Road via Late Member Abdur Rashid Mirdha House East Side – Maddy Goaliabaga GPS (Ch.00-420m). b) Construction of 1No 0.625x0.600m Culvert on Same Road at Ch. 285m. 0 0 1,875,536.00
04 Feb 2016
1,613,102.53 30 Mar 2017 06 Aug 2016 100
|
IRIDP-2
|
bauphal
|
578384281
|
0.42
|
0.62
|
|
18.75
|
Md. Azahar Uddin
|
16.13
|
04/02/2016
|
|
06/08/2016
|
100
|
|
|
06/05/2019
|
|
283
|
IRIDP-2/PTK/DW-11
|
Improvement of Bauphal Kalisuri GC RHD (Battala) – Indrokul High School & Bazar via Gazimazi High School & Kalikapur GPS (Ch. 00-500m).
|
IRIDP-2
|
bauphal
|
578384193
|
0.50
|
|
|
21.59
|
Md. Firoz
|
18.26
|
19/06/2016
|
|
06/08/2016
|
100
|
|
|
06/05/2019
|
|
284
|
IRIDP-2/PTK/DW-12
|
Improvement of Road from Surjamoni UPC – Nurainpur – Kanakdia Connecting via Akbaria Dakhil Madrasha (Ch. 00-500m).
|
IRIDP-2
|
bauphal
|
578384194
|
0.50
|
|
|
20.86
|
Brothers Treding, Pro. Md. Al-Amin Sikder
|
19.17
|
18/02/2016
|
|
20/05/2017
|
100
|
|
|
06/05/2019
|
|
285
|
IRIDP-2/PTK/DW-13
|
Improvement of Birpasha Bazar – Boga- Baherchar GC Connecting Road (Ch. 2735-3035m).
|
IRIDP-2
|
bauphal
|
578384198
|
0.30
|
|
|
12.95
|
Md. Akhtaruzzaman
|
10.94
|
07/02/2016
|
|
06/08/2016
|
100
|
|
|
06/05/2019
|
|
286
|
IRIDP-2/PTK/DW-14
|
Improvement of Joorpukuria GPS – Dhouravanga GPS – Banajora GPS via Chairman Motalab Howlader House Road (Ch. 00-675m).
|
IRIDP-2
|
bauphal
|
578384200
|
0.68
|
|
|
28.29
|
Md. Azahar Uddin
|
24.40
|
04/02/2016
|
|
25/01/2017
|
100
|
|
|
06/05/2019
|
|
287
|
IRIDP-2/PTK/DW-15
|
a) Improvement of Daurabanga Chancon Chowkider Shop – Khaukhali Bazar Road (Ch. 00-740m). b) Construction of 1No. 0.625x0.600m Culvert on Same Road at Ch. 480m.
|
IRIDP-2
|
bauphal
|
578384202
|
0.74
|
0.62
|
|
32.58
|
Md. Azahar Uddin
|
28.27
|
04/02/2016
|
|
10/01/2017
|
100
|
|
|
06/05/2019
|
|
288
|
IRIDP-2/PTK/DW-16
|
Improvement of Modonpura Sonamuddin High School – East Side of Modonpura Board GPS Road (Ch.00-500m).
|
IRIDP-2
|
bauphal
|
578384204
|
0.50
|
|
|
21.59
|
Md. Abdul Aziz Molla
|
19.30
|
18/02/2016
|
|
29/09/2016
|
100
|
|
|
06/05/2019
|
|
289
|
IRIDP-2/PTK/DW-17
|
a) Improvement of Abdul Aziz Mollah House – Nazirpur High School Road (Ch.00-468m). b) Construction of 1No. 0.625x0.600m Culvert on Same Road at Ch. 465m.
|
IRIDP-2
|
bauphal
|
578384206
|
0.47
|
0.62
|
|
23.13
|
Md. Azahar Uddin
|
20.02
|
08/02/2016
|
|
10/08/2016
|
100
|
|
|
06/05/2019
|
|
290
|
IRIDP-2/PTK/DW-18
|
a) Improvement of Bouphal Upazila H/Q – Kalaiya UZR at Zammader Bari GPS via Nazirpur Abdul Motaleb Bayati Bari Jame Mosque road (Ch. 00-570m) b) Construction of 1No. 0.625x0.600m Culvert on Same Road at Ch. 380m.
|
IRIDP-2
|
bauphal
|
578384100
|
0.57
|
0.62
|
|
25.23
|
Md. Azahar Uddin
|
21.75
|
04/02/2016
|
|
06/08/2016
|
100
|
|
|
06/05/2019
|
|
291
|
IRIDP-2/PTK/DW-19
|
Improvement of Kalayia Bogi UNR ( Sikder Bazar) South Saula GPS via SKDC High School Road Ch. 700-1077m
|
IRIDP-2
|
bauphal
|
578384207
|
0.38
|
|
|
15.10
|
Md. Firoz
|
13.28
|
01/02/2016
|
|
07/02/2018
|
100
|
|
|
06/05/2019
|
|
292
|
IRIDP-2/PTK/DW-21
|
a) Improvement of Olipura Nowmala UNR Road –Nowmala BDC Bazar via Md. Edrish Molla House – Sagor Ali Chowkidar House Road (Ch. 00-800m). b) Construction of 1No. 0.625x0.600m Culvert on Same Road at Ch. 236m.
|
IRIDP-2
|
bauphal
|
578384165
|
0.80
|
0.62
|
|
35.17
|
M/S. Najmus Shahadat Traders
|
32.52
|
09/03/2016
|
|
06/03/2017
|
100
|
|
|
06/05/2019
|
|
293
|
IRIDP-2/PTK/DW-22
|
a) Improvement of Adabaria Mohasraddi Siddik Merdhar Hat Gulita Mouja Digir per Road (Ch. 00-800m). b) Construction of 1no 0.625x0.600m Culvert on Same Road at Ch. 290m.
|
IRIDP-2
|
bauphal
|
578384211
|
0.80
|
0.62
|
|
33.96
|
Md. Enayet Hossain
|
31.97
|
08/03/2016
|
|
25/04/2017
|
100
|
|
|
06/05/2019
|
|
294
|
IRIDP-2/PTK/DW-23
|
a) Improvement of Adabaria – Milgor – Atoskhali High School (Ch. 1000-1576m). b) Construction of 1No 0.625x0.600m Culvert on Same Road at Ch. 1125m.
|
IRIDP-2
|
bauphal
|
578384213
|
0.58
|
0.62
|
|
25.49
|
Md. Enayet Hossain
|
24.00
|
20/03/2016
|
|
26/04/2017
|
100
|
|
|
06/05/2019
|
|
295
|
IRIDP-2/PTK/DW-26
|
Improvement of Mominpur GC – Fazilpur – Vhuar Hat Road (Ch.00-500m).
|
IRIDP-2
|
bauphal
|
578385153
|
0.50
|
|
|
21.59
|
Rezwanul Maksud
|
19.87
|
06/03/2016
|
|
28/05/2018
|
100
|
|
|
06/05/2019
|
|
296
|
IRIDP-2/PTK/DW-27
|
Improvement of Nowmala dasmina UZR – South Site of Nowar Hat – Hindupara – Banker HalimMia House Road (Ch.120-620m).
|
IRIDP-2
|
bauphal
|
578385146
|
0.50
|
|
|
21.59
|
M/S. Dr. A. Khalek Biswas Enterprise, Pro. Md. Atikur Rahman (Mamun)
|
17.96
|
24/03/2016
|
|
27/03/2017
|
100
|
|
|
06/05/2019
|
|
297
|
IRIDP-2/PTK/DW-28
|
a) Improvement of Kanakdia – Kalishuri UZR Road star Azaharer Rice Mill to Akbaria Sinior Madrasha via Late Abdul Barak Sikder Bari Road (Kanakdia – Kalisuri UZR to Late Abul Barek Sikder Road (CH. 00-500m). b) Construction of 1No. 0.625x0.600m Culvert on Same Road at Ch. 111m.
|
IRIDP-2
|
bauphal
|
578385126
|
0.50
|
0.62
|
|
22.21
|
M/S. Sikder Enterprise
|
20.08
|
01/03/2016
|
|
26/12/2017
|
100
|
|
|
06/05/2019
|
|
298
|
IRIDP-2/PTK/SDW-64
|
Construction of 15.0m RCC Girder Bridge on Balia Bazar-Shabupura Bazar via Balia GPS road at ch.1500m
|
IRIDP-2
|
bauphal
|
578384042
|
|
15.00
|
|
85.26
|
M/S. Jiaul & Brothers, Pro. Khandoker Jiaul Hossain
|
64.92
|
09/04/2016
|
|
27/03/2017
|
100
|
|
|
06/05/2019
|
|
299
|
IRIDP-2/PTK/SDW-65
|
Construction of 15.0m RCC Girder Bridge on Shabupura Tulatola Mor Sikder bari - Dasher howla UZR Connecting road at ch.1150m
|
IRIDP-2
|
bauphal
|
578385057
|
15.00
|
|
|
84.95
|
M/S. Jiaul & Brothers, Pro. Khandoker Jiaul Hossain
|
64.21
|
09/04/2016
|
|
25/03/2017
|
100
|
|
|
06/05/2019
|
|
300
|
IRIDP-2/PTK/SDW-77
|
(a) Improvement of Kachipara-(Health Complex) - Joybangla Bazar-Eidgha Mat -Maderbon Bazar. Via Rashid chairman house road (ch.00m - 400m) & Mosque link road 380.0m(b) Construction of 01no 1.0mx1.0m culvert at ch.330m on the same road
|
IRIDP-2
|
bauphal
|
578384110
|
0.78
|
1.00
|
|
44.65
|
Md. Firoz
|
39.14
|
08/02/2017
|
|
28/03/2018
|
100
|
|
|
06/05/2019
|
|
301
|
IRIDP-2/PTK/DW-101
|
(a) Improvement of Kachipara Karkhana BC – Karkhana Lanch Ghat via late Abdur Rob Master house road (ch.00-1100m) ID. No.578384369(b) Construction of 01no. 0.625mx0.60m culvert at ch.360m on the same road
|
IRIDP-2
|
bauphal
|
578384369
|
1.10
|
0.62
|
|
59.86
|
Sonali Enterprise
|
55.77
|
18/06/2017
|
|
20/11/2018
|
100
|
|
|
06/05/2019
|
|
302
|
IRIDP-2/PTK/DW-103
|
a) Improvement of Nazirpur bangla Bazar Road - Nazirpur high School Via Dipti Bari road (ch.700-825m) ID. No.(b) Improvement of Nazirpur UPC (Dhandi GPS) -Chandapara Bazer Via Sultanabad Bazar.road (ch.600-905m) ID. No.578383039(c) Improvement of Nazirpur High school – Tatuli river via Abul mira bari road (ch.800-955m) ID. No.578384377 578384377
|
IRIDP-2
|
bauphal
|
578384282
|
0.59
|
|
|
31.07
|
Md. Abdul Aziz Molla
|
27.96
|
18/06/2017
|
|
30/04/2018
|
100
|
|
|
06/05/2019
|
|
303
|
IRIDP-2/PTK/DW-104
|
(a) Improvement of Madonpura Khan Bari-Jalal Sikder House-Madonpura Board GPS road (ch.00-600m) ID. No.578385020(b) Construction of 01no. 0.625mx0.60m culvert at ch.525m on the same road
|
IRIDP-2
|
bauphal
|
578385020
|
0.60
|
0.62
|
|
34.38
|
Md. Abdul Aziz Molla
|
33.86
|
13/11/2017
|
|
25/01/2018
|
100
|
|
|
06/05/2019
|
|
304
|
IRIDP-2/PTK/DW-105
|
(a) Improvement of Kanakdia Kachipara Road To Gofur Sikdar House & APS Rafik House road (ch.00-550m) ID. No.(b) Construction of 01no. 1.0mx1.0m culvert at ch.356m on the same road 578385254
|
IRIDP-2
|
bauphal
|
578385254
|
0.55
|
1.00
|
|
36.52
|
M/S. Abul Kalam Azad
|
32.86
|
18/06/2017
|
|
21/09/2018
|
100
|
|
|
06/05/2019
|
|
305
|
IRIDP-2/PTK/DW-108
|
(a) Improvement of Kalisuri Baherchar UZR- Kalisuri Gopalia via khalek Merdha House(Sajjal bari – Qran sunna madrasha) road (ch.00-600m) ID. No.(b) Construction of 01no. 1.0mx1.0m culvert at ch.297m on the same road 578384232
|
IRIDP-2
|
bauphal
|
578384232
|
0.60
|
1.00
|
|
27.48
|
Md. Basir Uddin
|
27.38
|
18/06/2017
|
|
20/12/2017
|
100
|
|
|
06/05/2019
|
|
306
|
IRIDP-2/PTK/DW-109
|
(a) Improvement of Kachipara-(Health Complex) - Joybangla Bazar-Eidgha Mat -Maderbon Bazar.road (ch.400-1500m) ID. No.578384110(b) Construction of 02no. 0.625mx0.60m culvert at ch.740m & 1240m on the same road
|
IRIDP-2
|
bauphal
|
578384110
|
1.10
|
1.25
|
|
63.59
|
M/S. Deip Enterprise
|
63.19
|
18/06/2017
|
|
20/03/2018
|
100
|
|
|
06/05/2019
|
|
307
|
IRIDP-2/PTK/DW-110
|
Improvement of Mominpur Bissas Bari-Saber Howlader House-Sikder Bazar road (ch.00-600m) ID. No.578385150
|
IRIDP-2
|
bauphal
|
578385150
|
0.60
|
|
|
32.38
|
Md. Abdul Aziz Molla
|
32.12
|
31/08/2017
|
|
25/12/2018
|
100
|
|
|
06/05/2019
|
|
308
|
IRIDP-2/PTK/DW-111
|
(a) Improvement of Bauphal UPC (Bilbilas Bazar)- Keshabpur Bazer via Surjomoni UPC road (ch.400-600m &3670m-4270m) ID. No.(b) Construction of 01no. 0.625mx0.60m culvert at ch.4200m on the same road 578383033
|
IRIDP-2
|
bauphal
|
578383033
|
0.80
|
0.62
|
|
43.54
|
Md. Khair Hossain
|
42.86
|
14/08/2017
|
|
28/05/2018
|
100
|
|
|
06/05/2019
|
|
309
|
IRIDP-2/PTK/DW-113
|
(a) Improvement of Adabaria UPC-Hatem Mirder hat-Golabari Hat. Via Hazir Hat road (ch.7700m-8160m) ID. No.578383030(b) Construction of 01no. 1.0mx1.0m culvert at ch.8046m on the same road
|
IRIDP-2
|
bauphal
|
578383030
|
0.46
|
1.00
|
|
28.44
|
Md. Iqbal Hossain
|
26.30
|
19/01/2017
|
|
06/05/2018
|
100
|
|
|
06/05/2019
|
|
310
|
IRIDP-2/PTK/DW-115
|
Improvement of Boga Bazar Bridge -Dhowravanga west side Foraje Bari Bridgeroad (ch.00-500m) ID. No. 578385129 0
|
IRIDP-2
|
bauphal
|
578385129
|
0.50
|
|
|
28.50
|
M/S. Najmus Shahadat Traders
|
25.65
|
19/01/2017
|
|
28/05/2018
|
100
|
|
|
06/05/2019
|
|
311
|
IRIDP-2/PTK/DW-116
|
(a) Improvement of Joorpukuria GPS-Dhouravanga GPS-Banajora GPS via Chairman Motalab howlader house road (ch.750m-1410m) ID. No.(b) Construction of 01no. 1.0mx1.0m culvert at ch.1140m on the same road. 578384200
|
IRIDP-2
|
bauphal
|
578384200
|
0.66
|
1.00
|
|
38.42
|
Md. Azahar Uddin
|
37.84
|
22/01/2017
|
|
25/04/2018
|
100
|
|
|
06/05/2019
|
|
312
|
IRIDP-2/PTK/DW-117
|
Improvement of kalaiya Nuru Mia House Road-Jamal Merdha House road (ch.00-500m) ID. No. 578385137
|
IRIDP-2
|
bauphal
|
578385137
|
0.50
|
|
|
28.74
|
Sonali Enterprise
|
27.49
|
22/01/2017
|
|
31/05/2018
|
100
|
|
|
06/05/2019
|
|
313
|
IRIDP-2/PTK/DW-118
|
Improvement of Boga Milghor UZR Road-Ashury Hawlader Hat.road (ch.7000-7850m) ID. No.578384065
|
IRIDP-2
|
bauphal
|
578384065
|
0.85
|
|
|
48.27
|
Brothers Treding, Pro. Md. Al-Amin Sikder
|
46.34
|
22/06/2017
|
|
20/03/2018
|
100
|
|
|
06/05/2019
|
|
314
|
IRIDP-2/PTK/DW-119
|
Improvement of Kalaiya Bogi Bazar Road-Taro Gor Via Nurul Islam Member House.road (ch.00-370m) ID. No.578385135
|
IRIDP-2
|
bauphal
|
578385135
|
0.37
|
|
|
20.01
|
Md. Abdur Rashid Mia
|
18.00
|
22/06/2017
|
|
25/12/2018
|
100
|
|
|
06/05/2019
|
|
315
|
IRIDP-2/PTK/DW-120
|
Improvement of Bauphal Kalaiya Dasmina R&H(kanchon Ali Master) Kotpar Connacting road (ch.00-450m) ID. No. 578385136
|
IRIDP-2
|
bauphal
|
578385136
|
0.45
|
|
|
24.48
|
M/S. Sithi Traders
|
23.26
|
22/06/2017
|
|
30/04/2018
|
100
|
|
|
06/05/2019
|
|
316
|
IRIDP-2/PTK/DW-121
|
Improvement of Kalaiya Dasmina R&H wapda Veri(Nur jahan Garden) South Shoula GPS Via Ahmed Ali Kha Jame Mosque road (ch.00-1000m) ID. No.578384210.& Link Mosque and Park-200m
|
IRIDP-2
|
bauphal
|
578384210
|
1.20
|
|
|
69.21
|
M/S. Monira Enterprise
|
62.29
|
22/06/2017
|
|
20/03/2018
|
10
|
|
|
06/05/2019
|
|
317
|
IRIDP-2/PTK/DW-122
|
(a) Improvement of Birpasha Bazar-(North side)- Bottola Bridge Jabber Shop via Nadu Holader Yousuf Howlader Bariroad (ch.780m-1580m) ID. No.578384196.(b) Construction of 01no. 1.0mx1.0m culvert at ch.1585m on the same road.
|
IRIDP-2
|
bauphal
|
578384196
|
0.80
|
1.00
|
|
46.30
|
M/S. Zakir Enterprise
|
43.87
|
22/06/2017
|
|
28/05/2018
|
100
|
|
|
06/05/2019
|
|
318
|
IRIDP-2/PTK/DW-124
|
Improvement of Daspara Bas Stand-Aziz Howlader-House Of Alauddin Road (ch.00-400m) ID. No.578385154
|
IRIDP-2
|
bauphal
|
578385154
|
0.40
|
|
|
22.64
|
M/S. Sithi Traders
|
21.33
|
22/06/2017
|
|
30/05/2018
|
100
|
|
|
06/05/2019
|
|
319
|
IRIDP-2/PTK/DW-126
|
(a) Improvement of Mominpur GC-Fazilpur-Vhuar Hat Road (ch.500m-1000m) ID. No.578385153. & Mosq. Link 150m(b) Construction of 01no. 0.625mx0.60m culvert at ch.620m on the same road.
|
IRIDP-2
|
bauphal
|
578385153
|
0.65
|
0.62
|
|
33.92
|
Md. Abdul Aziz Molla
|
33.56
|
08/11/2017
|
|
15/12/2018
|
100
|
|
|
06/05/2019
|
|
320
|
IRIDP-2/PTK/DW-95
|
(a) Improvement of Alipura -Kalagachia GC- B.B Roy High school road (ch.00m - 1150m)(b) Construction of 01no 1.50mx1.50m culvert at ch.300m on the same road.(c) Construction of 01no 3.0mx3.0m culvert at ch.750m on the same road.
|
IRIDP-2
|
dashmina
|
578524069
|
1.15
|
4.50
|
|
78.13
|
Shafiqur Rahman
|
70.32
|
25/04/2017
|
|
05/06/2018
|
100
|
|
|
12/05/2019
|
|
321
|
IRIDP-2/PTK/DW-96
|
Improvement of Nizabad Asrayan UZR-Ranua Hat via Mirmadon GPS road (ch.1950m - 3500m)
|
IRIDP-2
|
dashmina
|
578524050
|
1.55
|
|
|
79.57
|
M/S. Abul Kalam Azad
|
79.36
|
25/04/2017
|
|
30/10/2018
|
100
|
|
|
12/05/2019
|
|
322
|
IRIDP-2/PTK/DW-97
|
Improvement of Dasmina UP- Dashmina Upazila Border via Mollar hat.road (ch.6720m - 8250m)Construction of 3 nos 1.50mx1.50m Culvert at ch. 7020m, 7270m & 7730m on the same Road.
|
IRIDP-2
|
dashmina
|
578523003
|
1.53
|
4.50
|
|
90.65
|
M/S. Selim Store
|
90.65
|
25/04/2017
|
|
30/04/2019
|
65
|
|
|
12/05/2019
|
|
323
|
IRIDP-2/PTK/DW-149
|
(a)Improvement of CharBorhan Launchghat-Birazer Kheyaghat road (ch.00-1750m) ID. No.578524001(b)Improvement of Maddya Char Borhan Reg. P.School-Cyclone Sheltre..road (ch.600-2100m) ID. No.578524005(c) Construction of 02no. 2.0mx2.0m culvert at ch.1400m&1930m on the same road
|
IRIDP-2
|
dashmina
|
578524005
|
3.25
|
4.00
|
|
229.59
|
M/S. Abul Kalam Azad
|
240.01
|
10/12/2017
|
|
30/01/2019
|
75
|
|
|
12/05/2019
|
|
324
|
IRIDP-2/PTK/SDW-168
|
Improvement of Nizabad Asrayan UzR-Ranua Hat via Mirmadon GPS road (ch. 3500m-4040m) ID No. 578524050
|
IRIDP-2
|
dashmina
|
578524050
|
0.54
|
|
|
41.72
|
M/S. Palli Stores,Pro. Md. Golam Sawrar (Badal)
|
39.64
|
19/08/2018
|
|
25/01/2019
|
15
|
|
|
12/05/2019
|
|
325
|
IRIDP-2/PTK/DW-32
|
(a)Improvement of Alipur UP – koatkhali Bazar via Kalamiar Hat ( Dashmina Part) Road ( Ch. 4823-5308m) ( Alipur UP – Patabunia GC) b) Construction of 1No. 1.5mx1.5m Culvert on Same Road at Ch. 5143m.
|
IRIDP-2
|
dashmina
|
578523006
|
0.49
|
1.50
|
|
32.25
|
M/S. Milenium Traders
|
26.91
|
06/06/2016
|
|
30/08/2017
|
100
|
|
|
09/05/2019
|
|
326
|
IRIDP-2/PTK/DW-33
|
Improvement of Labukhali Galachipa RHD near Panchom Ali Bepari - Labukhali Galachipa RHD – Alipur GC UZR via Uttar Arojbegi GPS ( RHD Road near Sobhan Bapari House to North Arozbagi GPS) Road (Ch. 00-600m).
|
IRIDP-2
|
dashmina
|
578525191
|
0.60
|
|
|
32.78
|
M/S. Milenium Traders
|
26.65
|
06/06/2016
|
|
06/08/2016
|
100
|
|
|
09/05/2019
|
|
327
|
IRIDP-2/PTK/DW-34
|
Improvement of Hazir Hat UZR-Dhandhania Wapda Bari Bandh Road (Ch.800m-1975m).
|
IRIDP-2
|
dashmina
|
578524017
|
1.18
|
|
|
65.29
|
M/S. Palli Stores,Pro. Md. Golam Sawrar (Badal)
|
56.80
|
06/04/2016
|
|
26/01/2017
|
100
|
|
|
09/05/2019
|
|
328
|
IRIDP-2/PTK/DW-35
|
Improvement of Dasmina Arojbegi UNR near Nowab Ali Hazi Bari Battala Mosque - Laksmipur GPS via Ributi Mondal House Road ( Ch. 00-950m).
|
IRIDP-2
|
dashmina
|
578524116
|
0.95
|
|
|
51.35
|
M/S. Sunrise Construction, Pro. Md. Kamal Hossain
|
47.72
|
09/03/2016
|
|
25/11/2017
|
100
|
|
|
09/05/2019
|
|
329
|
IRIDP-2/PTK/DW-36
|
Improvement of Betagi Thakurer Hat – Bottala Bazar Road (Ch.1200 - 2800m).
|
IRIDP-2
|
dashmina
|
578524079
|
1.60
|
|
|
42.20
|
M/S. Hima Bricks, Pro. Mrs. Fatema Enayet Bithi
|
39.45
|
20/03/2016
|
|
06/08/2016
|
100
|
|
|
09/05/2019
|
|
330
|
IRIDP-2/PTK/DW-61
|
Improvement of Dumki Satani Chowkiderbari Al-Modina Mosque - H/O Jalal Master - Ujjan Ali Munshi (Labukhali-Boga RHD (H/O Somer UddinChowkider) -Angari road (Ch.00m - 550m).
|
IRIDP-2
|
dumki
|
578964072
|
0.55
|
|
|
15.87
|
H/O Khorshed Howlader
|
14.17
|
27/03/2016
|
|
30/03/2017
|
15
|
|
|
06/05/2019
|
|
331
|
IRIDP-2/PTK/DW-68
|
(a) Improvement of Angaria UPC (Baher chor ferry ghat) - Razakhali Bazar via T&T, Kadamtala Bazar.road (ch.867m - 1237m)(b) Construction of 01no 1.00mx 1.00m culvert at ch.1052m on the same road
|
IRIDP-2
|
dumki
|
578963002
|
0.37
|
1.00
|
|
24.50
|
M/S. Nisha Enterprise
|
19.83
|
10/10/2016
|
|
28/02/2018
|
55
|
|
|
06/05/2019
|
|
332
|
IRIDP-2/PTK/DW-83
|
(a) Improvement of Angaria UPC(Baher Chor Ferry Ghat)-Razakhali Bazar via T&T, Kadamtala Bazar.road (ch.1237m - 1603m)(b) Construction of 01no 1.0mx1.0m culvert at ch.1240 m on the same road(b) Construction of 01no 6.10m culvert at ch.862m on the same road
|
IRIDP-2
|
dumki
|
578963002
|
0.37
|
7.10
|
|
40.52
|
Md. Giusuddin
|
36.46
|
25/04/2017
|
|
27/11/2018
|
100
|
|
|
30/04/2019
|
|
333
|
IRIDP-2/PTK/DW-55
|
Improvement of Dumki Union Connecting Road (Khurmatala Bridge) - H/O Jahanara Member road (Ch.467m - 1017m).
|
IRIDP-2
|
dumki
|
578964098
|
0.55
|
|
|
15.97
|
Md. Firoz
|
15.00
|
11/04/2016
|
|
10/06/2017
|
100
|
|
|
29/04/2019
|
|
334
|
IRIDP-2/PTK/DW-56
|
Improvement of South Muradia S.M. Kalagacia GPS-North side H/O doctor Edrish Ali Khan road (Ch.600m -1000m)
|
IRIDP-2
|
dumki
|
578964152
|
0.40
|
|
|
11.08
|
Md. Firoz
|
10.39
|
11/04/2016
|
|
17/07/2016
|
100
|
|
|
29/04/2019
|
|
335
|
IRIDP-2/PTK/DW-57
|
Improvement of Angaria UP- Upazila H/Q RHD via Dumki GPS road (Ch.00m -550m)
|
IRIDP-2
|
dumki
|
578963011
|
0.55
|
|
|
16.40
|
Md. Shamim Ahsan
|
16.33
|
24/03/2016
|
|
30/06/2016
|
100
|
|
|
29/04/2019
|
|
336
|
IRIDP-2/PTK/DW-58
|
Improvement of Angaria UP (MontuMirdha Bari)-nasir Bari Bridge road (Ch.00m - 550m)
|
IRIDP-2
|
dumki
|
578963008
|
0.55
|
|
|
15.44
|
Md. Shamim Ahsan
|
15.32
|
24/03/2016
|
|
30/11/2016
|
100
|
|
|
29/04/2019
|
|
337
|
IRIDP-2/PTK/DW-59
|
Construction of 3.0mx3.0m Culvert on Angaria UP-North side H/O Abubakar (West Jharta) road at Ch.200m)
|
IRIDP-2
|
dumki
|
578963009
|
|
3.00
|
|
12.31
|
Suresh Chandra Bishwas
|
8.94
|
27/03/2016
|
|
02/08/2016
|
100
|
|
|
29/04/2019
|
|
338
|
IRIDP-2/PTK/DW-60
|
Improvement of Dumki Satani H/O (AsmanGazi)-Holagachia via Dumki Satani GPS road (Ch.00m -600m).
|
IRIDP-2
|
dumki
|
578965081
|
0.60
|
|
|
17.17
|
Suresh Chandra Bishwas
|
14.97
|
27/03/2016
|
|
02/08/2016
|
100
|
|
|
29/04/2019
|
|
339
|
IRIDP-2/PTK/DW-62
|
Improvement of Angaria Hatem Ali Atem Khana (H/O Abu Chairman) - H/O Bajlu member via H/O Giash Uddin road (Ch.00m - 626m)
|
IRIDP-2
|
dumki
|
578965142
|
0.63
|
|
|
18.83
|
M/S. Deip Enterprise
|
18.83
|
28/03/2016
|
|
03/07/2016
|
100
|
|
|
29/04/2019
|
|
340
|
IRIDP-2/PTK/DW-69
|
(a) Improvement of Atharogachia Dakhli Madrasha - East Kartikpasha H/O Joynal Fakir.road (ch.00m - 2250m)(b) Construction of 02nos 1.00mx 1.00m culvert at ch.404m & 652m on the same road
|
IRIDP-2
|
dumki
|
578965083
|
2.25
|
2.00
|
|
129.04
|
M/S. Selim Store
|
109.03
|
02/10/2016
|
|
04/04/2018
|
100
|
|
|
29/04/2019
|
|
341
|
IRIDP-2/PTK/DW-70
|
(a) Improvement of East Karticpasha (H/O Aziz Mirah) - East Karticpasha road (ch.00m - 1210m)(b) Construction of 02nos 1.00mx 1.00m culvert at ch.226m & 920m on the same road 0 0 7,127,175.00
10 Oct 2016
5,706,378.63 31 Mar 2018 28 Mar 2018 100
|
IRIDP-2
|
dumki
|
578964153
|
1.21
|
2.00
|
|
71.27
|
Suresh Chandra Bishwas
|
57.06
|
10/10/2016
|
|
28/03/2018
|
100
|
|
|
29/04/2019
|
|
342
|
RIDP-2/PTK/DW-78
|
(a) Improvement of Angaria (Baher Char RHD) H/O Malek Mridha - H/O Ali Howlader via H/O Moulana Nashir Uddin road (ch.00m - 580m)(b) Construction of 01no 1.0mx1.0m culvert at ch.130m on the same road
|
IRIDP-2
|
dumki
|
578965143
|
0.58
|
1.00
|
|
22.10
|
Sonali Enterprise
|
21.70
|
25/04/2017
|
|
05/02/2018
|
100
|
|
|
29/04/2019
|
|
343
|
IRIDP-2/PTK/DW-79
|
Improvement of Angaria UP (H/O muntu Mridha, West jhatra GPS) – H/O Nashai Bridge road (ch.180m - 1500m)
|
IRIDP-2
|
dumki
|
578963008
|
1.32
|
|
|
43.53
|
Sonali Enterprise
|
42.79
|
25/04/2017
|
|
04/03/2018
|
100
|
|
|
29/04/2019
|
|
344
|
IRIDP-2/PTK/DW-80
|
Improvement of Angaria UP - UZHQ Via Dumki GPS road (ch.550m - 862m & 1292m-1692m)
|
IRIDP-2
|
dumki
|
578963011
|
0.71
|
|
|
25.44
|
Sonali Enterprise
|
24.87
|
25/04/2017
|
|
03/04/2018
|
100
|
|
|
29/04/2019
|
|
345
|
IRIDP-2/PTK/DW-81
|
(a)Improvement of Dumki Union Connecting Road (Khurmatala baridge) - Jatra Jahanara Member bari road (ch.1010m - 1830m)(b) Construction of 01no 1.0mx1.0m culvert at ch.1192m on the same road
|
IRIDP-2
|
dumki
|
578964098
|
0.82
|
1.00
|
|
29.60
|
Sonali Enterprise
|
29.01
|
25/04/2017
|
|
04/03/2018
|
100
|
|
|
29/04/2019
|
|
346
|
IRIDP-2/PTK/DW-82
|
Improvement of Jhatra Napit bari -Kadomtala bazar (H/O habib houlader bari) road (ch.680m - 1700m)
|
IRIDP-2
|
dumki
|
578964002
|
1.02
|
|
|
47.76
|
Sonali Enterprise
|
47.22
|
25/04/2017
|
|
04/03/2018
|
100
|
|
|
29/04/2019
|
|
347
|
IRIDP-2/PTK/DW-84
|
Improvement of Angaria Hatem Ali Atim Khana (H/O Abu Chairman) - H/O Bajlu Member bari via H/O Gias Uddin road (ch.626m - 926m)
|
IRIDP-2
|
dumki
|
578965142
|
0.30
|
|
|
10.11
|
Sonali Enterprise
|
9.96
|
25/04/2017
|
|
04/03/2018
|
100
|
|
|
29/04/2019
|
|
348
|
IRIDP-2/PTK/DW-85
|
(a)Improvement of Lebukhali-Bauphal RHD(Nisi Mondal Bari)-Angaria U.P via Rob Talukder Bari road (ch.00m - 490m)(b) Construction of 01no 1.0mx1.0m culvert at ch.169m on the same road
|
IRIDP-2
|
dumki
|
578964023
|
1.00
|
0.49
|
|
19.47
|
uresh Chandra Bishwas
|
18.22
|
25/04/2017
|
|
10/10/2017
|
100
|
|
|
29/04/2019
|
|
349
|
IRIDP-2/PTK/DW-86
|
Improvement of Jamla Bridge - Muradha Baro Sikder Bari via Gabtali Bazar road (ch.1535m - 2095m)
|
IRIDP-2
|
dumki
|
578964067
|
0.56
|
|
|
18.16
|
Sonali Enterprise
|
17.99
|
25/04/2017
|
|
03/02/2018
|
100
|
|
|
29/04/2019
|
|
350
|
IRIDP-2/PTK/DW-87
|
Improvement of Sreerampur UPC (Labukhali Boga RHD) -Gabtali Bazar via LAM United Mohela College & High School road (ch.00m - 500m)
|
IRIDP-2
|
dumki
|
578963003
|
0.50
|
|
|
30.64
|
M/S. Palli Stores,Pro. Md. Golam Sawrar (Badal)
|
27.57
|
25/04/2017
|
|
30/10/2017
|
100
|
|
|
29/04/2019
|
|
351
|
IRIDP-2/PTK/DW-88
|
(a)Improvement of Algi Musa Mirdha Bari (Bridge) - Shorb Mirdha & Moulana Habibur Rahman house Bari road (ch.300m - 900m)(b) Construction of 01no 1.0mx1.0m culvert at ch.450m on the same road
|
IRIDP-2
|
dumki
|
578964109
|
0.60
|
1.00
|
|
22.58
|
Sonali Enterprise
|
22.11
|
25/04/2017
|
|
08/04/2018
|
100
|
|
|
29/04/2019
|
|
352
|
IRIDP-2/PTK/DW-89
|
Improvement of West Muradia west wapda -Bimal BISwas Bari (infront carpeting road) road (ch.00m - 550m)
|
IRIDP-2
|
dumki
|
578965016
|
0.55
|
|
|
18.02
|
Sonali Enterprise
|
17.82
|
25/04/2017
|
|
04/02/2018
|
100
|
|
|
29/04/2019
|
|
353
|
IRIDP-2/PTK/DW-90
|
Improvement of Panchyet Hat - Basiria Senior Madrasha via Taltali Bazar road (ch.00m - 550m)
|
IRIDP-2
|
dumki
|
578964124
|
0.55
|
|
|
17.94
|
Sonali Enterprise
|
17.77
|
25/04/2017
|
|
04/03/2018
|
100
|
|
|
29/04/2019
|
|
354
|
IRIDP-2/PTK/DW-91
|
Improvement of Raja Rahamatullha Jalisha T&T Road - Amin Ghata khal gora (valu gain bari) road (ch.355m - 1000m)
|
IRIDP-2
|
dumki
|
578964111
|
0.65
|
|
|
20.98
|
Sonali Enterprise
|
20.67
|
25/04/2017
|
|
03/04/2018
|
100
|
|
|
29/04/2019
|
|
355
|
IRIDP-2/PTK/DW-92
|
Construction of 01no 3.0mx3.0m culvert at ch.450m on the Labukhali UP – Near lhe H/O Mokbul Sharif ( West Lebukhali) road
|
IRIDP-2
|
dumki
|
578965156
|
|
3.00
|
|
13.02
|
M/S. Mohiuddin Ahmed
|
11.71
|
25/04/2017
|
|
28/05/2017
|
100
|
|
|
29/04/2019
|
|
356
|
IRIDP-2/PTK/DW-129
|
Improvement of Keshabpur GPS (Bazar) – Basak bazar via Kesabpur Talukder bari (Jainkati UP- Bashak Bazar Via Keshabpur bazar) road (ch.2700-3280m)
|
IRIDP-2
|
dumki
|
578953055
|
0.58
|
|
|
20.11
|
Syed Md. Sohel
|
19.96
|
11/10/2017
|
|
20/02/2018
|
100
|
|
|
29/04/2019
|
|
357
|
IRIDP-2/PTK/DW-52
|
Improvement of H/O Raja RahametUllah - Amin Ghata Khal gora road (Ch.00m - 800m).
|
IRIDP-2
|
dumki
|
578965030
|
0.80
|
|
|
23.54
|
Md. Shamim Ahsan
|
23.44
|
24/03/2016
|
|
30/10/2016
|
100
|
|
|
28/04/2019
|
|
358
|
IRIDP-2/PTK/DW-54
|
Improvement of Labukhali - Boga RHD - H/O Nasimondol via H/O A Rob Talukder road (ch.487m -1187m).
|
IRIDP-2
|
dumki
|
578964023
|
0.70
|
|
|
20.78
|
Suresh Chandra Bishwas
|
17.80
|
27/03/2016
|
|
27/02/2017
|
100
|
|
|
28/04/2019
|
|
359
|
IRIDP-2/PTK/DW-74
|
(a) Improvement of Baher Gazalia WAPDA - Jamaddar bari - Isadi Chander hat road (ch.3450m - 6000m)(b) Construction of 02nos 0.625mx0.60m culvert at ch.4550m & 5250m on the same road.
|
IRIDP-2
|
galachipa
|
578574077
|
2.55
|
1.25
|
|
113.54
|
Md. Asadur Rahman
|
96.63
|
10/10/2016
|
|
25/05/2018
|
100
|
|
|
12/05/2019
|
|
360
|
IRIDP-2/PTK/DW-75
|
(a) Improvement of Kala raja hat - Horidebpur high School (katakhali Madrasha) road (ch.1550m - 2550m)(b) Construction of 01no 2.0mx2.0m culvert at ch.2150m on the same road.
|
IRIDP-2
|
galachipa
|
578574016
|
1.00
|
2.00
|
|
50.07
|
M/S. Ruma Bricks
|
42.56
|
10/10/2016
|
|
05/12/2017
|
100
|
|
|
12/05/2019
|
|
361
|
IRIDP-2/PTK/DW-76
|
(a) Improvement of south Kapalbera Bazar - Baro Shiba Matir Killa (Closser) road (ch.1000m - 2000m)(b) Construction of 01no 0.625mx0.60m culvert at ch.1650m on the same road.
|
IRIDP-2
|
galachipa
|
578574075
|
1.00
|
0.63
|
|
44.67
|
M/S. Gazi Construction
|
42.03
|
27/09/2019
|
|
17/06/2017
|
100
|
|
|
12/05/2019
|
|
362
|
IRIDP-2/PTK/MW-152
|
Maintenance of Atkhali UZR-Chandrail UNR [Galachipa (Atkhali)-Gazalia FWC) Road (00-5250m) ID. No.[578574141]
|
IRIDP-2
|
galachipa
|
578574141
|
5.25
|
|
|
73.32
|
M/S. Kohinoor Enterprise
|
65.99
|
21/09/2017
|
|
20/01/2018
|
100
|
|
|
12/05/2019
|
|
363
|
IRIDP-2/PTK/SDW-153
|
(a)Improvement of Sekander kari house to North WAPDA road (ch.00-1000m) ID. No. 578574168(b) Construction of 02no 0.625mx0.60m culvert at ch.325m&830m on the same road
|
IRIDP-2
|
galachipa
|
578574168
|
1.00
|
1.25
|
|
45.72
|
M/S. Kabir Traders
|
41.15
|
08/11/2017
|
|
10/05/2018
|
100
|
|
|
12/05/2019
|
|
364
|
IRIDP-2/PTK/DW-155
|
Improvement of South Kapalvera Bazar – North Charbiswash FRB (Closure Bazar) road (ch.00-1850m) ID. No. 578574399
|
IRIDP-2
|
galachipa
|
578574399
|
1.85
|
|
|
109.19
|
M/S. Saibal Enterprise
|
106.56
|
18/01/2018
|
|
25/12/2018
|
100
|
|
|
12/05/2019
|
|
365
|
IRIDP-2/PTK/DW-157
|
Improvement of Bangabandhu Sriti UZR-dakkin Purbo Ulania GPs via Gramardon GPS road (ch.2150-3300m) ID. No. 578574227
|
IRIDP-2
|
galachipa
|
578574227
|
1.15
|
|
|
68.16
|
M/S. Saibal Enterprise
|
66.55
|
18/01/2018
|
|
20/10/2018
|
100
|
|
|
12/05/2019
|
|
366
|
IRIDP-2/PTK/DW-72
|
Improvement of Galachipa H/Q.-Galachipa UP to WAPDA road (ch.5370m - 7370m)
|
IRIDP-2
|
galachipa
|
578573010
|
2.00
|
|
|
107.27
|
Md. Asadur Rahman
|
91.25
|
10/10/2016
|
|
30/05/2019
|
25
|
|
|
12/05/2019
|
|
367
|
IRIDP-2/PTK/DW-156
|
(a)Improvement of Galachipa College-H/O Abu Baker siddique (Samudafath road Ratandi GPS) road (ch.00-1760m) ID. No. 578574047(b) Construction of 03no 0.625mx0.90m culvert at ch.57m,500m&660m on the same road(c) Construction of 01no 1.50mx1.50m culvert at ch.930m on the same road
|
IRIDP-2
|
galachipa
|
578574047
|
1.76
|
3.38
|
|
112.92
|
M/S. Snehangsu Sarkar
|
109.50
|
18/01/2018
|
|
24/01/2019
|
65
|
|
|
12/05/2019
|
|
368
|
IRIDP-2/PTK/SDW-191
|
(a)Improvement of Sekander kari house to North WAPDA road (ch.1000m-1550m) ID. No. 578574168(b) Construction of 01no 0.60mx0.60m culvert at ch.1200m on the same road
|
IRIDP-2
|
galachipa
|
578574168
|
0.55
|
0.60
|
|
53.65
|
Md. Khokon Shikder
|
50.97
|
31/01/2019
|
|
08/08/2019
|
20
|
|
|
12/05/2019
|
|
369
|
IRIDP-2/PTK/DW-29
|
(a)Improvement of Amkhola UP- Sehakati Hat road(ch.3700m-5100m)b) Construction of 1No. 0.625x0.600m Culvert on Same Road at Ch. 3750m.
|
IRIDP-2
|
galachipa
|
578573001
|
1.40
|
0.62
|
|
75.57
|
Mizanur Rahman Monir
|
64.42
|
19/04/2016
|
|
07/02/2018
|
100
|
|
|
09/05/2019
|
|
370
|
IRIDP-2/PTK/DW-30
|
Improvement of Baher Gazalia Madrasha -WAPDA road( ch.2000m-3740m)
|
IRIDP-2
|
galachipa
|
578575027
|
1.74
|
|
|
76.06
|
Mizanur Rahman Monir
|
64.16
|
19/04/2016
|
|
29/03/2018
|
100
|
|
|
09/05/2019
|
|
371
|
IRIDP-2/PTK/DW-31
|
Improvement of Patabunia Chomed Khan-Joynal Howlader House road(ch.00m-350m)
|
IRIDP-2
|
galachipa
|
578575015
|
0.35
|
|
|
15.11
|
M/S. Sunrise Construction, Pro.
|
14.20
|
09/03/2016
|
|
15/09/2016
|
100
|
|
|
09/05/2019
|
|
372
|
IRIDP-2/PTK/DW-71
|
(a) Improvement of Galabaria Bazar - Kallayan Kalos .road (ch.2000m - 3500m)(b) Construction of 01no 0.625mx0.60m culvert at ch.2350m on the same road
|
IRIDP-2
|
galachipa
|
578573006
|
1.50
|
0.63
|
|
81.20
|
M/S. Najmus Shahadat Traders
|
77.87
|
10/10/2016
|
|
27/04/2018
|
100
|
|
|
09/05/2019
|
|
373
|
IRIDP-2/PTK/DW-73
|
(a) Improvement of Choto Shiba FRB - Baro Shiba Launch ghat road (ch.1700m - 3950m)(b) Construction of 01no 2.00mx 2.00m culvert at ch.3350m on the same road(c) Construction of 01no 0.625mx 0.60m culvert at ch.3650m on the same road
|
IRIDP-2
|
galachipa
|
578573030
|
2.25
|
2.63
|
|
127.84
|
M/S. Selim Store
|
108.66
|
02/10/2016
|
|
08/07/2017
|
100
|
|
|
09/05/2019
|
|
374
|
IRIDP-2/PTK/DW-165
|
(a)Improvement of Tieakhali UPC - RHD (Biskani) road (ch.884m-2100m) ID. No. 578665307(b) Construction of 01no 2.60mx4.0m culvert at ch.1708m on the same road
|
IRIDP-2
|
kalapara
|
578665307
|
1.22
|
2.60
|
|
88.31
|
H.M. Delowar Hossain
|
86.65
|
29/03/2018
|
|
05/01/2019
|
62
|
|
|
13/05/2019
|
|
375
|
IRIDP-2/PTK/DW-187
|
(a)Improvement of Gohinkhali UZR - South Fulkhali GPS - WAPDA UNR .road (ch.00m-1250m) ID. No. 578584146(b) Construction of 01no 0.625mx0.60m culvert at ch.1050m on the same road
|
IRIDP-2
|
kalapara
|
578584146
|
1.25
|
0.62
|
|
95.70
|
M/S. Bhuyia Construction
|
90.92
|
21/01/2019
|
|
28/07/2019
|
60
|
|
|
13/05/2019
|
|
376
|
IRIDP-2/PTK/SDW-192
|
(a)Improvement of Badur toli - South Teakhali GPS ( Badurtoly villg. Hafez Jommaddar – Salam miara house ) road (ch.00m-1000m) ID. No. 578664039 & Link road 250.0m(b) Construction of 02no 0.60mx0.60m culvert at ch.300m,900m on the same road
|
IRIDP-2
|
kalapara
|
578664039
|
1.25
|
1.20
|
|
95.78
|
M/S. Safiqul Enterprise
|
90.99
|
03/02/2019
|
|
10/12/2019
|
5
|
|
|
13/05/2019
|
|
377
|
IRIDP-2/PTK/DW-37
|
(a)Improvement of Road Gilatala GPS - Pachim Wapda (Ch. 2700m-4505m) b) Construction of 1No. 2.0mx2.0m Culvert on Same Road at Ch.2925m. c) Construction of 1No.0.60mx0.60m Culvert on Same Road at Ch.4200m.
|
IRIDP-2
|
kalapara
|
578664044
|
1.81
|
2.60
|
|
69.03
|
M/S. Palli Stores,Pro. Md. Golam Sawrar (Badal)
|
68.14
|
09/03/2016
|
|
14/03/2017
|
100
|
|
|
12/05/2019
|
|
378
|
IRIDP-2/PTK/DW-38
|
Improvement of road Baliatali Chapli Bazar GCC Road - Bayddaopara Road(Ch.00m-1500m).
|
IRIDP-2
|
kalapara
|
578665204
|
1.50
|
|
|
51.67
|
M/S. K.K. Enterprise, Pro. Md. Kabir Hossain
|
50.95
|
25/02/2016
|
|
06/08/2016
|
100
|
|
|
12/05/2019
|
|
379
|
IRIDP-2/PTK/DW-39
|
(a) Improvement of Lamupara Zafer Talukder House-Amtolipara Khaleque khan house road (ch. 00-2375m). (b) Construction of 3 nos 0.60mx0.60m culvert on the same road at (ch. 535m, 670m & 2335m)
|
IRIDP-2
|
kalapara
|
578665153
|
2.38
|
1.80
|
|
86.11
|
M/S. Hima Bricks, Pro. Mrs. Fatema Enayet Bithi
|
83.18
|
08/03/2016
|
|
15/02/2017
|
100
|
|
|
12/05/2019
|
|
380
|
IRIDP-2/PTK/DW-40
|
(a) Improvement of Dalbugonj High School-Fulbunia Kheya Ghat road at (Ch. 00-1769m) (b) Construction of 2 nos 0.60mx0.60m Culvert at ch.1400m &1725m on the same road (c) Construction of 2 nos 3.30mx 3.00m culvert at ch. 668m&1037m on the same road 0 0 7,067,861.00
23 Feb 2016
7,067,861.00 31 Dec 2017 31 Dec 2017 100
|
IRIDP-2
|
kalapara
|
578664045
|
1.77
|
7.80
|
|
70.67
|
Shafiqur Rahman
|
70.67
|
23/02/2016
|
|
31/12/2017
|
100
|
|
|
12/05/2019
|
|
381
|
IRIDP-2/PTK/DW-41
|
(a) Improvement of Kathalpara Noor High-Howlader Bari road (ch. 00-2000m) (b) Construction of 01no 1.50mx 1.50m culvert at ch.1210m on the same road
|
IRIDP-2
|
kalapara
|
578665139
|
2.00
|
1.50
|
|
74.54
|
Md. Enayet Hossain
|
68.00
|
19/04/2016
|
|
22/03/2018
|
100
|
|
|
12/05/2019
|
|
382
|
IRIDP-2/PTK/DW-42
|
(a) Improvement of Baro Baliatali GCCR-Latif Chaklader house road a (ch. 00-2675m) (b) Construction of 0.60mx0.60m Culvert at ch.2290m on the same road (c) Construction of 01no 1.50mx1.50m Culvert at ch. 1100m on the same road (d) Construction of 01 no 3x4.00x4.00m Culvert at ch.1925m on the same road .
|
IRIDP-2
|
kalapara
|
578665037
|
2.68
|
14.10
|
|
119.09
|
M/S. Snehangsu Sarkar
|
107.68
|
09/03/2016
|
|
27/08/2017
|
100
|
|
|
12/05/2019
|
|
383
|
IRIDP-2/PTK/MW-43
|
Maintenance of Borobaliatoli Nolbunia After ali Matubber Bari - Degor baliatoli Bridge via G.C.C. road (ch.00m-4250m) ID. No. 578665246
|
IRIDP-2
|
kalapara
|
578665246
|
4.25
|
|
|
36.59
|
M/S. Gazi Enterprise
|
34.59
|
18/03/2018
|
|
01/04/2018
|
100
|
|
|
12/05/2019
|
|
384
|
IRIDP-2/PTK/DW-162
|
Improvement of Salimpur Bazar - Nilgonj UPC Via Tongibaria GPS road (ch.1940m-4072m) ID. No. 578663008
|
IRIDP-2
|
kalapara
|
578663008
|
2.13
|
|
|
130.09
|
Md. Yousuf Ali
|
127.49
|
29/03/2018
|
|
02/01/2019
|
100
|
|
|
12/05/2019
|
|
385
|
IRIDP-2/PTK/DW-163
|
(a)Improvement of Khalilpur RHD -Doulatpur GPS – WAPDA road (ch.00m-2075m) ID. No. 578665256(b) Construction of 01no 0.600mx0.60m culvert at ch.150m on the same road
|
IRIDP-2
|
kalapara
|
578665256
|
2.08
|
0.60
|
|
110.01
|
M/S. Najmus Shahadat Traders
|
114.40
|
20/08/2018
|
|
02/04/2019
|
100
|
|
|
12/05/2019
|
|
386
|
IRIDP-2/PTK/DW-98
|
Improvement of Lalua UPC-nilgonj UPC Road.Via Baliatoli UPC, Mithagong UPC road (Ch.13245-16945m)(b) Construction of 03no 1.50mx1.50m culvert at ch.13345m,15525m& 16045m on the same road(c) Construction of 02no 0.60mx0.60m culvert at ch.15173m&15345 on the same road
|
IRIDP-2
|
kalapara
|
578663004
|
3.70
|
5.70
|
|
228.74
|
M/S. Santu Traders
|
205.86
|
11/05/2017
|
|
17/05/2017
|
0
|
|
|
12/05/2019
|
|
387
|
IRIDP-2/PTK/SDW-99
|
(a) Improvement of Tagachia Bazar - Mithagonj Gazir Bazar Road via Modokhali Dakkail madrasha, Bishakhola bridge (ch.6050-8500m)(b) Construction of 02no 0.60mx0.60m culvert at ch.6350m& 6540m on the same road
|
IRIDP-2
|
kalapara
|
578665279
|
2.45
|
1.20
|
|
135.33
|
M/S. Santu Traders
|
121.80
|
25/04/2017
|
|
25/12/2018
|
60
|
|
|
12/05/2019
|
|
388
|
IRIDP-2/PTK/DW-100
|
(a) Improvement of Baliatulli – Karmazaparra via Modupara road (ch.00-4915m)(b) Construction of 02no 1.50mx1.50m culvert at ch.3260m&4335m on the same road Road ID: (c) Construction of 01no 0.60mx0.60m culvert at ch.1100m on the same road 578665004
|
IRIDP-2
|
kalapara
|
578665004
|
4.92
|
3.60
|
|
281.74
|
M/S. Santu Traders
|
253.56
|
11/05/2017
|
|
31/05/2019
|
15
|
|
|
12/05/2019
|
|
389
|
IRIDP-2/PTK/DW-160
|
(a)Improvement of Baharchar Bazar - Neta bazar via Nadu pada. road (ch.1976m-3646m) ID. No. 578584229(b) Construction of 01no 2.0mx2.0m culvert at ch.2750m on the same road(c) Construction of 01no 0.60mx0.90m culvert at ch.3060m on the same road
|
IRIDP-2
|
kalapara
|
578584229
|
1.67
|
2.60
|
|
188.29
|
M/S. Mohiuddin Ahmed
|
188.25
|
29/03/2018
|
|
05/04/2019
|
10
|
|
|
12/05/2019
|
|
390
|
IRIDP-2/PTK/DW-164
|
(a)Improvement of Monihapur - Mowlamer khal road (ch.00m-950m) ID. No. 578665007(b) Construction of 01no 0.600mx0.60m culvert at ch.320m on the same road
|
IRIDP-2
|
kalapara
|
578665007
|
0.95
|
0.60
|
|
60.75
|
Brothers Treding, Pro. Md. Al-Amin Sikder
|
60.20
|
20/03/2018
|
|
05/10/2018
|
70
|
|
|
12/05/2019
|
|
391
|
IRIDP-2/PTK/SDW-189
|
(a)Improvement of Kesmath sree nagor high school-Barrerdhone River ( Kismat sreenagar high school – Laximipura bridge) road (ch.00m-1650m) ID. No. 578764050(b) Construction of 01no 1.50mx1.50m culvert at ch.750m on the same road
|
IRIDP-2
|
mirjaganj
|
578764050
|
1.65
|
1.50
|
|
114.38
|
M/S. Munim Enterprise
|
108.66
|
20/03/2019
|
|
26/08/2019
|
0
|
|
|
06/05/2019
|
|
392
|
IRIDP-2/PTK/SDW-158
|
(a)Improvement of Gazipur hat-H/O Tajem Hawlader-Gabua GPS-RHD at Amrajuri road (ch.00-1500m) (b) Construction of 03no 1.50mx1.50m culvert at ch.132m,542m&812m on the same road
|
IRIDP-2
|
mirjaganj
|
578764073
|
1.50
|
4.50
|
|
81.80
|
M/S. Snehangsu Sarkar
|
79.00
|
18/01/2018
|
|
20/10/2018
|
100
|
|
|
30/04/2019
|
|
393
|
IRIDP-2/PTK/DW-159
|
(a)Improvement of Dakkhin Mazidbaria Gazi Bari Pool - Mizan-Dulal Bari road (ch.465-605m) ID. No. (b) Construction of 01no 1.50mx1.50m culvert at ch.465m on the same road 578765199
|
IRIDP-2
|
mirjaganj
|
578765199
|
0.14
|
1.50
|
|
17.92
|
M/S. Palli Stores,Pro. Md. Golam Sawrar (Badal)
|
16.13
|
18/01/2018
|
|
04/05/2018
|
100
|
|
|
30/04/2019
|
|
394
|
IRIDP-2/PTK/DW-46
|
Improvement of Golderbari – Nuria Dakhil Madrasha-H/O Razzaque Mollah at Sreemonto River road (Ch. 1700-3150m).
|
IRIDP-2
|
mirjaganj
|
578764003
|
1.45
|
|
|
40.76
|
Siful Enterprise
|
37.60
|
28/03/2016
|
|
29/07/2016
|
100
|
|
|
28/04/2019
|
|
395
|
IRIDP-2/PTK/DW-47
|
Improvement of Dakhin Mozidbaria Gazi Bari pool - mizan,Dulal Bari road (Ch.00m - 465m).
|
IRIDP-2
|
mirjaganj
|
578765199
|
0.47
|
|
|
14.91
|
Md. Shamim Ahsan
|
14.81
|
24/03/2016
|
|
28/06/2016
|
100
|
|
|
28/04/2019
|
|
396
|
IRIDP-2/PTK/DW-48
|
Improvement of Shing Bari - Kewabunia Sluice gate via Dakhin Kakrabunia RPS road (Ch.00m - 960m).
|
IRIDP-2
|
mirjaganj
|
578764101
|
0.96
|
|
|
29.85
|
Syed Md. Sohel
|
31.32
|
28/03/2016
|
|
03/07/2016
|
100
|
|
|
28/04/2019
|
|
397
|
IRIDP-2/PTK/DW-49
|
Improvement of Gabua Nabab Ali Kerani Bari - Blaiet Member Bari - Aziz Howlader Bari -Tazuddin Master Bari road (ch. 00-498m).
|
IRIDP-2
|
mirjaganj
|
578765201
|
0.50
|
|
|
14.88
|
Md. Shamim Ahsan
|
13.92
|
24/03/2016
|
|
05/05/2018
|
100
|
|
|
28/04/2019
|
|
398
|
IRIDP-2/PTK/DW-50
|
Improvement of Batamara GPS – Dakhin Gabua Reg. Pry. School via Latif Chairman Bari road (Ch.800m -1475m).
|
IRIDP-2
|
mirjaganj
|
578765098
|
0.68
|
|
|
19.86
|
S.M Trading
|
20.71
|
28/03/2016
|
|
27/03/2017
|
100
|
|
|
28/04/2019
|
|
399
|
IRIDP-2/PTK/DW-51
|
Improvement of Angaria UP - Rajakhali Bazar via T&T Kadamtala Bazar road (Ch 00m - 626m).
|
IRIDP-2
|
mirjaganj
|
578963002
|
0.63
|
|
|
18.56
|
S.M Trading
|
19.34
|
28/03/2016
|
|
03/07/2016
|
100
|
|
|
28/04/2019
|
|
400
|
IRIDP-2/PTK/SDW-93
|
(a) Improvement of Daritaluk Pucca road ( Abdul Rog Gazibari ) – Kismat Moukaram Pucca road ( Bajlul Houladar Bari) road (ch.00m - 1620m) &Mosque link road 80.00m(b) Construction of 02no 1.50mx1.50m culvert at ch.200m & 1610m on the same road
|
IRIDP-2
|
patuakhali-s
|
578955388
|
1.70
|
3.00
|
|
75.44
|
M/S. Palli Stores,Pro. Md. Golam Sawrar (Badal)
|
67.90
|
25/04/2017
|
|
02/05/2018
|
32
|
|
|
06/05/2019
|
|
401
|
IRIDP-2/PTK/DW-94
|
Improvement of Itbaria Pukurjana Isahak Ali Jommader to Sathghar bazar via Aziz Molla H/S road (ch.1500m-2000m) ID. No. 578954302 0 0 0 2,357,861.00 2,239,967.95 0
|
IRIDP-2
|
patuakhali-s
|
578954302
|
0.50
|
|
|
23.57
|
Mizanur Rahman Manir
|
22.39
|
|
|
|
0
|
|
|
06/05/2019
|
|
402
|
IRIDP-2/PTK/DW-132
|
Improvement of Lohalia Kakarbunia Shahalam Sikder bari -Monir Mollah Dokan road (ch.00-580m) ID. No. 578955405
|
IRIDP-2
|
patuakhali-s
|
578955405
|
0.58
|
|
|
20.07
|
Md. Enayet Hossain
|
19.42
|
12/07/2017
|
|
20/11/2018
|
30
|
|
|
06/05/2019
|
|
403
|
IRIDP-2/PTK/DW-144
|
Improvement of Khalishakhali Fatiker Khaya ghat west side Wapda Sluice- west side khalpar, north side Kalu Mredha bari,Munshi bari – north side khalisakhali GPS & H/S roadroad (ch.00m-600m) ID. No.Construction of 1.00mx1.00m Culvert at Ch.375m on the same Road 578954381
|
IRIDP-2
|
patuakhali-s
|
578954381
|
0.60
|
1.00
|
|
35.75
|
M/S. Shahin Enterprise
|
35.75
|
12/07/2017
|
|
30/08/2018
|
45
|
|
|
06/05/2019
|
|
404
|
IRIDP-2/PTK/SDW-166
|
a) Improvement of Sreerampur Bazar- kaler hat Bazar via Dhakkin Sreerampur GPS road (Ch.00-1200m)b) Construction of 02no 1.50x1.50m culvert at Ch. 1050m&1200m on the same road.
|
IRIDP-2
|
patuakhali-s
|
578954044
|
1.20
|
3.00
|
|
85.46
|
Md. Mahafuz Khan
|
76.92
|
22/03/2018
|
|
28/12/2018
|
70
|
|
|
06/05/2019
|
|
405
|
IRIDP-2/PTK/SMW-167
|
(a)Maintenance of Itbaria UPC-Kalichana Bazar via Ghopkhali Bazar road (ch.00m-1750m) ID. No. 578953025(b) Construction of 01no 3.0mx3.0m culvert at ch.800m on the same road(c) Construction of 01no 1.50mx1.50m culvert at ch.930m on the same road
|
IRIDP-2
|
patuakhali-s
|
578953025
|
1.75
|
4.50
|
|
48.12
|
Md. Mahafuz Khan
|
43.31
|
04/06/2018
|
|
26/12/2018
|
10
|
|
|
06/05/2019
|
|
406
|
IRIDP-2/PTK/SDW-181
|
Improvement of Sreerampur Bazar-Kaler hat Bazar via Dakkhin Sreerampur GPS Road (Ch. 1200m-1750m) ID. No. 578954044
|
IRIDP-2
|
patuakhali-s
|
578954044
|
0.55
|
|
|
39.27
|
M/S. Sikder Enterprise
|
37.31
|
09/10/2018
|
|
16/04/2019
|
60
|
|
|
06/05/2019
|
|
407
|
IRIDP-2/PTK/DW-183
|
Improvement of Arshed Molla Barir Mosque – Mojibar Khan Bari via Uzzal dali road (ch.00m-250m) ID. No. 578954424 & Mosque link.133m.
|
IRIDP-2
|
patuakhali-s
|
578954424
|
0.38
|
|
|
20.52
|
M/S. Bhuyia Construction
|
19.50
|
21/01/2019
|
|
28/07/2019
|
0
|
|
|
06/05/2019
|
|
408
|
IRIDP-2/PTK/DW-184
|
Improvement of Khalishakhali Ferry ghat hat to UZR ( Khalishakhali H/S) road (ch.00m-300m) ID. No. 578955058
|
IRIDP-2
|
patuakhali-s
|
578955058
|
0.30
|
|
|
20.70
|
M/S. Abul Kalam Azad
|
19.67
|
|
|
|
0
|
|
|
06/05/2019
|
|
409
|
IRIDP-2/PTK/DW-185
|
Improvement of Chottobeghi Kumarkhali Madrasha to Seraj Ali Akan Bari via Sobahan Mredha bariroad (ch.650m-1000m) ID. No. 578954291
|
IRIDP-2
|
patuakhali-s
|
578954291
|
0.35
|
|
|
15.89
|
Mrs. Rahima Traders
|
15.10
|
21/01/2019
|
|
28/07/2019
|
15
|
|
|
06/05/2019
|
|
410
|
IRIDP-2/PTK/SDW-169
|
(a)Improvement of Kachabunia Bazar to Pairakunja bazar road (ch.00m-1023m) ID. No. 578954211(b) Construction of 01no 1.50mx1.50m culvert at ch.940m on the same road
|
IRIDP-2
|
patuakhali-s
|
578954211
|
1.02
|
1.50
|
|
84.27
|
M/S. M.L. Builders
|
80.06
|
09/10/2018
|
|
04/02/2019
|
100
|
|
|
30/04/2019
|
|
411
|
IRIDP-2/PTK/DW-186
|
(a)Improvement of Kalikapur Bahalgachia Pakar Matha to Akin Holwader bari road (ch.940m-1040m) ID. No. (b) Construction of 01no 3.00mx3.00m culvert at ch.1042m on the same road
|
IRIDP-2
|
patuakhali-s
|
578954277
|
0.10
|
3.00
|
|
19.19
|
M/S. Akon Enterprise
|
18.23
|
17/01/2019
|
|
15/02/2019
|
100
|
|
|
30/04/2019
|
|
412
|
IRIDP-2/PTK/DW-3
|
(a) Improvement of Patuakhali Ferry gaht - Khalishakhali H/S East side Ghat road (ch.400m-850m) (b)Const. of 3.00mX3.00m culvert at ch.950m on the same road.
|
IRIDP-2
|
patuakhali-s
|
578955058
|
0.45
|
3.00
|
|
23.17
|
Mizanur Rahman Manir
|
19.36
|
29/02/2016
|
|
02/08/2016
|
100
|
|
|
30/04/2019
|
|
413
|
IRIDP-2/PTK/DW-63
|
Improvement of Nandipara Bridge - Nandipara GPS via Maddya Nandiapara GPS Mativanga bazar road (ch.00m-1150m)
|
IRIDP-2
|
patuakhali-s
|
578955172
|
1.15
|
|
|
35.04
|
M/S. Kalam Construction
|
29.07
|
11/04/2016
|
|
02/08/2016
|
100
|
|
|
29/04/2019
|
|
414
|
IRIDP-2/PTK/DW-66
|
Improvement of Tangrakhali UNR road – Zilaparisad Dack bangle via Tangrakhali Oij Abad madrasha & Tangrakhali GPS. road (ch.00m-253m)
|
IRIDP-2
|
patuakhali-s
|
578954237
|
0.25
|
|
|
20.07
|
M/S. Sunrise Construction, Pro. Md. Kamal Hossain
|
16.49
|
18/07/2016
|
|
24/11/2016
|
100
|
|
|
29/04/2019
|
|
415
|
IRIDP-2/PTK/DW-67
|
Improvement of Badarpur Kherunessa Mahila Madrasha – Darber Sharif via Khan Bahadur Bari road (ch.00m-830m) & Link 70.0m
|
IRIDP-2
|
patuakhali-s
|
578955341
|
0.90
|
|
|
43.59
|
M/S. Jiaul & Brothers, Pro. Khandoker Jiaul Hossain
|
35.75
|
31/08/2016
|
|
21/03/2018
|
100
|
|
|
29/04/2019
|
|
416
|
IRIDP-2/PTK/DW-130
|
Improvement of Charbalaykhati Joynal Abidin mridha – Mia bari Pool (ch.00-735m)
|
IRIDP-2
|
patuakhali-s
|
578955125
|
0.74
|
|
|
24.92
|
Md. Enayet Hossain
|
24.21
|
12/07/2017
|
|
18/01/2018
|
100
|
|
|
29/04/2019
|
|
417
|
IRIDP-2/PTK/DW-131
|
Improvement of Vhayla Jaynal Khan School-Bishas Bari Via Sholeman Munshi Bari road (ch.00-560m)
|
IRIDP-2
|
patuakhali-s
|
578955397
|
0.56
|
|
|
19.92
|
Md. Enayet Hossain
|
19.29
|
12/07/2017
|
|
17/01/2018
|
100
|
|
|
29/04/2019
|
|
418
|
IRIDP-2/PTK/DW-133
|
Improvement of Lohalia Up Kartick Pal bari – Miarhat via Anis Sikder bari road (ch.00-1300m)
|
IRIDP-2
|
patuakhali-s
|
578954149
|
1.30
|
|
|
45.85
|
Md. Enayet Hossain
|
43.81
|
12/07/2017
|
|
20/12/2018
|
100
|
|
|
29/04/2019
|
|
419
|
IRIDP-2/PTK/DW-135
|
Improvement of Auliapur RHD Waresh Sikder bari – Sone Ali Houlader bari via Jalal Mridha Bari road (ch.6600-7000m)
|
IRIDP-2
|
patuakhali-s
|
578954398
|
0.40
|
|
|
21.87
|
M/S. Kabir Traders
|
19.69
|
12/07/2017
|
|
05/01/2018
|
100
|
|
|
29/04/2019
|
|
420
|
IRIDP-2/PTK/DW-136
|
Improvement of Choddobhuria dhali bari Patabunia bazar road (ch7250-7630m)
|
IRIDP-2
|
patuakhali-s
|
578952008
|
0.42
|
|
|
22.47
|
Md. Azahar Uddin
|
21.75
|
12/07/2017
|
|
09/08/2018
|
100
|
|
|
29/04/2019
|
|
421
|
IRIDP-2/PTK/DW-137
|
Improvement of Uttar Baduria high School - Amkhola UPC via Shehakati Bazar & Purbo Badura Sr.Madrasha via Alamin Sikder bari .road (ch.6950-7600m)
|
IRIDP-2
|
patuakhali-s
|
578953047
|
0.65
|
|
|
37.28
|
M/S. Kabir Traders
|
33.55
|
13/08/2017
|
|
10/01/2018
|
100
|
|
|
29/04/2019
|
|
422
|
IRIDP-2/PTK/DW-138
|
Improvement of Tangrakhali Abul Mazid bari – Ansar mredha bari road (ch.00-570m)
|
IRIDP-2
|
patuakhali-s
|
578955505
|
0.57
|
|
|
19.76
|
Md. Basir Uddin
|
20.75
|
10/12/2017
|
|
30/03/2018
|
100
|
|
|
29/04/2019
|
|
423
|
IRIDP-2/PTK/DW-139
|
Improvement of Pachim Auliapur Fatulah Bazar- Seni Ali Bari via Adersho high school road (ch.00m-570m)
|
IRIDP-2
|
patuakhali-s
|
578954251
|
0.57
|
|
|
19.77
|
Md. Basir Uddin
|
19.39
|
12/07/2017
|
|
02/12/2017
|
100
|
|
|
29/04/2019
|
|
424
|
IRIDP-2/PTK/DW-140
|
Improvement of Purba Katakhali Sluice road – Au Board School road (ch.00m-570m) ID.
|
IRIDP-2
|
patuakhali-s
|
578954249
|
0.57
|
|
|
19.57
|
Md. Manebur Rahman
|
18.99
|
12/07/2017
|
|
04/12/2017
|
100
|
|
|
29/04/2019
|
|
425
|
IRIDP-2/PTK/DW-141
|
Improvement of Bahalgachia kolom Gazi bari – Hetalia mosque via kancon munsi bari road (ch.00m-940m)
|
IRIDP-2
|
patuakhali-s
|
578954277
|
0.94
|
|
|
33.26
|
M/S. Najmus Shahadat Traders
|
32.96
|
12/07/2017
|
|
15/01/2018
|
100
|
|
|
29/04/2019
|
|
426
|
IRIDP-2/PTK/DW-142
|
Improvement of Matibanga Khaleque Sikder bari – Kumarkhali Alia Madrasha (Chottobeghi Kumarkhali Madrasha to Seraj Ali Akan Bari via Sobahan Mredha bari ) road (ch.00m-650m)
|
IRIDP-2
|
patuakhali-s
|
578954291
|
0.65
|
|
|
22.06
|
Shafiqur Rahman
|
21.88
|
12/07/2017
|
|
03/05/2018
|
100
|
|
|
29/04/2019
|
|
427
|
IRIDP-2/PTK/DW-143
|
Improvement of Maderbunia Up at Nandipara gram Mazaffar chokider bari – Chottb egi Fultala (UZR Nandipara Bridge) to UNR Nandipara GPS road) road(ch.1150-1650m)
|
IRIDP-2
|
patuakhali-s
|
578955172
|
0.68
|
|
|
22.27
|
Md. Khabir Uddin Mridha
|
21.19
|
12/07/2017
|
|
15/01/2018
|
100
|
|
|
29/04/2019
|
|
428
|
IRIDP-2/PTK/DW-145
|
Improvement of Auliapur UPC-Keshabpur Hat.road (ch.2620-3800m)
|
IRIDP-2
|
patuakhali-s
|
578953038
|
1.18
|
|
|
66.09
|
M/S. Kabir Traders
|
59.48
|
26/07/2017
|
|
20/11/2017
|
100
|
|
|
29/04/2019
|
|
429
|
IRIDP-2/PTK/DW-146
|
(a)Improvement of Sreerampur Portoniz jadughar Mosque - Lahaj Master bari via Hanif Munsi bari road (ch.220-500m) ID. No.578954383.&Mosque Link -78m(b) Construction of 01no. 2.50mx2.50m culvert at ch.464m on the same road.
|
IRIDP-2
|
patuakhali-s
|
578954383
|
0.36
|
2.50
|
|
21.30
|
M/S. Najmus Shahadat Traders
|
19.17
|
12/07/2017
|
|
07/03/2018
|
100
|
|
|
29/04/2019
|
|
430
|
IRIDP-2/PTK/DW-147
|
Improvement of Dhakin Dharandi GPS -Mohammadia Hafizia ,Nurani Madrasha road (ch.00-465m)
|
IRIDP-2
|
patuakhali-s
|
57895398
|
0.47
|
|
|
26.57
|
Md. Manebur Rahman
|
23.99
|
12/07/2017
|
|
15/01/2018
|
100
|
|
|
29/04/2019
|
|
431
|
IRIDP-2/PTK/DW-148
|
Improvement of Dumki Upazila H/Q (Janata Collage) - Moukoron GC (East Karticpasha UZR) via Islamia Dakhil Madrasha.road (ch.00-1920m)
|
IRIDP-2
|
patuakhali-s
|
578963013
|
1.92
|
|
|
91.19
|
Md. Abdul Halim Mondal
|
86.95
|
12/07/2017
|
|
22/11/2018
|
100
|
|
|
29/04/2019
|
|
432
|
IRIDP-2/PTK/DW-151
|
Improvement of Dhankhali Bazar – Pukurjana bazar Gani sikder bari road (ch.00-450m)
|
IRIDP-2
|
patuakhali-s
|
578954135
|
0.45
|
|
|
16.36
|
M/S. Palli Stores,Pro. Md. Golam Sawrar (Badal)
|
17.07
|
08/11/2017
|
|
09/04/2018
|
100
|
|
|
29/04/2019
|
|
433
|
IRIDP-2/PTK/DW-154
|
Improvement of Itbaria Pukurjana Isahak Ali Jommader - Sathghar Bazar via Aziz Molla H/S road (Ch.00-1500m)
|
IRIDP-2
|
patuakhali-s
|
578954302
|
1.50
|
|
|
54.41
|
Md. Basir Uddin
|
57.15
|
10/12/2017
|
|
15/03/2018
|
100
|
|
|
29/04/2019
|
|
434
|
IRIDP-2/PTK/DW-1
|
Improvement of Bottolbunia College- Late Mujafar Chowkider Bari-Late Keramat Ali Howlader Bari road (ch.00m-1100m) 0
|
IRIDP-2
|
patuakhali-s
|
578955179
|
1.10
|
|
|
36.99
|
Brothers Treding, Pro. Md. Al-Amin Sikder
|
32.26
|
29/02/2016
|
|
01/08/2016
|
100
|
32.24
|
|
28/04/2019
|
|
435
|
IRIDP-2/PTK/DW-2
|
Improvement of Patuakhali-Barisal R&H (Kader Munshi) Bari - Badarpur Moslem Khan Bari via Hakim Ali Bari. (ch.00m-900m)& Mosque Link road180m
|
IRIDP-2
|
patuakhali-s
|
578955156
|
1.08
|
|
|
35.00
|
Mizanur Rahman Manir
|
29.52
|
25/02/2016
|
|
01/06/2018
|
100
|
|
|
28/04/2019
|
|
436
|
IRIDP-2/PTK/DW-4
|
Improvement of North Kachisira Motaher Molla Bari - Dakhin Kachisira Hanif Merdha Bari Pul (Dhankhali UNR-Ghopkhali UNR Haji Bari) road (ch.00m-725m.
|
IRIDP-2
|
patuakhali-s
|
578954135
|
0.73
|
|
|
19.93
|
Brothers Treding, Pro. Md. Al-Amin Sikder
|
16.56
|
18/02/2016
|
|
02/08/2016
|
100
|
|
|
28/04/2019
|
|
437
|
IRIDP-2/PTK/DW-5
|
Improvement of Talikhali Datter Bridge - west Talikhali GPS-Talikhali Dakhil Madrasha & cyclone Shelter ( ch.1000m-1890m.)
|
IRIDP-2
|
patuakhali-s
|
578953019
|
0.89
|
|
|
29.90
|
izanur Rahman Manir
|
24.58
|
29/02/2016
|
|
02/08/2016
|
100
|
|
|
28/04/2019
|
|
438
|
IRIDP-2/PTK/DW-6
|
Improvement of Pukurjana Anil Das Bari - Ishaque Bari College (Itbaria UPC to Sathghar Bazar) road(ch.00m-740m)
|
IRIDP-2
|
patuakhali-s
|
578953026
|
0.74
|
|
|
24.96
|
Mizanur Rahman Manir
|
20.73
|
25/02/2016
|
|
02/08/2016
|
100
|
|
|
28/04/2019
|
|
439
|
IRIDP-2/PTK/DW-44
|
Improvement of Sreerampur Bazar (Sreerampur School) UZR – Kalikapur GPS via Moddya Sreerampur GPS road (Ch. 1500-2250m).
|
IRIDP-2
|
patuakhali-s
|
578954196
|
0.75
|
|
|
25.45
|
Md. Enayet Hossain
|
25.39
|
20/03/2016
|
|
02/08/2016
|
100
|
|
|
28/04/2019
|
|
440
|
IRIDP-2/PTK/DW-45
|
Improvement of Ballabpur Mazibari - Shadia College via GaniChowkider Bari, ballabpur GPS road (Ch. 00-900m).
|
IRIDP-2
|
patuakhali-s
|
578954179
|
0.90
|
|
|
25.19
|
S.M Trading
|
23.09
|
11/04/2016
|
|
02/08/2016
|
100
|
|
|
28/04/2019
|
|
441
|
IRIDP-2/PTK/DW-188
|
Improvement of South Kajir Howla Rg.P.S - H/o Aliomgier medha road (ch.826m-2300m) ID. No. 578585218 0 0 0 10,920,203.00 21 Jan 2019 10,374,192.85 28 Jul 2019 25
|
IRIDP-2
|
Rangabali
|
578585218
|
1.47
|
|
|
109.20
|
M/S. Bhuyia Construction
|
103.74
|
21/01/2019
|
|
28/07/2019
|
25
|
|
|
13/05/2019
|
|
442
|
IRIDP-2/PTK/SDW-150
|
Improvement of Gohinkhali Bazar UZR- Gohinkhali Launch ghat road (Ch.3200m-3450m) & Moktob Link road 00-280m.
|
IRIDP-2
|
Rangabali
|
578584231
|
0.53
|
|
|
47.33
|
M/S. Palli Stores,Pro. Md. Golam Sawrar (Badal)
|
46.89
|
22/07/2017
|
|
14/01/2018
|
100
|
|
|
12/05/2019
|
|
443
|
IRIDP-2/PTK/DW-161
|
(a)Improvement of Gohin khali C. Shelter-Horidrakhali road (ch.3000m-4400m) ID. No. (b) Construction of 02no 0.625mx0.60m culvert at ch.3430m,4200m on the same road
|
IRIDP-2
|
Rangabali
|
578585068
|
1.40
|
1.25
|
|
156.62
|
M/S. Kohinoor Enterprise
|
140.96
|
29/03/2018
|
|
05/04/2019
|
10
|
|
|
12/05/2019
|
|
444
|
LGED/MDSP/PATU/14-15/NW-05
|
Construction of 36 nos GPS cum Disaster Shelters with connecting Road.
|
MDSP
|
patuakhali-s
|
|
31.32
|
|
|
20814.02
|
The Civil Engineers Ltd & Nabarun Traders Ltd (JV)
|
24032.94
|
09/03/2020
|
16/06/2020
|
31/12/2021
|
14
|
|
|
10/02/2021
|
|
445
|
RERMP-3/PA TUA/W-31
|
Maintenance of Rural
Roads Patuakhali ()
|
RERMP-3
|
patuakhali-s
|
N/A
|
|
|
33
|
2701.00
|
N/A
|
2701.00
|
|
|
|
40
|
896.00
|
33
|
26/12/2021
|
|
446
|
SP14192/Char Roy Shaheb FCD Subproject
|
Char Alji Khal Re-excavation(ch: 0.00-1900 m) Char Kachua Khal Re-excavation(ch: 0.00-650 m) Char Roy Shaherb Embankment Re-sectioning (Ch: 5035 - 13550 m) Reference Lined Section (4 nos.) and SP Identification Signboard (2 nos.) WMCA Office Construction, Electrification Works and Furniture Supply Regulator Repair of Char Kachua Khal -. Regulator Repairs of Dakshin Char Mizan Khal -. Regulator Repairs of Char Alji Khal -.
|
SSSWRDP
|
bauphal
|
|
|
11.06
|
95
|
121.99
|
Presideny:Sohel Rana
Secretary:Mahinur
|
119.36
|
28/11/2020
|
23/02/2021
|
30/04/2021
|
96
|
114.14
|
95
|
30/11/2022
|
|
447
|
SP43050/Moddah-Purba Rajapur Subproject
|
Shikhol Gara Khal Re-excavation(ch0.00-2500m) Kumar Khali Branch Khal Re-excavation(ch0.00-2100m) Hisbullah Khal Re-excavation(ch0.00-1380m) Dighir Par Khal Re-excavation(ch0.00-900m) Souder Khal Re-excavation(ch0.00-500m) Thakur Bari Khal Re-excavation(ch0.00-500m) Ref. Lined Section 12 Nos. On 6 Khals, And SP Identf. Signboard (2 nos.) Maintenace of WMCA office building -
|
SSSWRDP
|
bauphal
|
|
|
7.88
|
97
|
71.29
|
Shidul rahaman/Farjana
|
70.93
|
31/01/2021
|
26/07/2021
|
30/04/2022
|
100
|
69.03
|
97
|
30/11/2022
|
|
448
|
SP43058/Shabupura Khal Subproject
|
Re-excavation of Fultala Khal-1 (Ch-0+00km to 1+600km) Re-excavation of Fultala Khal-2 (Ch-0+000km to 1+800km) Re-excavation of Fultala Khal-3 (Ch-0+000km to 0+820km) Re-excavation of Fultala Khal-4 (Ch-0+000km to 0+500km) Re-excavation of Uttar Raj Nagar Khal (Ch-0+000km to 1+400km) Re-excavation of Gazi Hota-2 Khal (Ch-0+000km to 1+100km) Ref. Lined Section 13 Nos. On 6 Khals, And SP Identf. Signboard (2 nos.) Rehabilitation of WMCA Office -
|
SSSWRDP
|
bauphal
|
|
|
7.22
|
100
|
71.76
|
MD. KHOKON SHIKDAR
|
71.27
|
22/06/2022
|
25/07/2022
|
30/04/2022
|
100
|
70.90
|
100
|
30/11/2022
|
|
449
|
SP41005/Kanakdia FMD Subproject
|
Re-Sectioning of Kanadia Embankment(Ch.0+000 Km to 7+750 Km) Re-Excavation of Amirabad Khal (Ch.0+000 Km to 2+750 Km) Re-Excavation of Narayanpasha Branch Khal (Ch.0+000 Km to 1+200 Km) Re-Excavation of Dakual Khal (Ch.0+000 Km to 0+600 Km) Const. of 6 Nos. Reference Lined on 3 Khals, SP Identification sign board 2 Nos. and SP Indication Post 2 Nos.
|
SSSWRDP
|
bauphal
|
|
|
12.30
|
98
|
111.86
|
LCS-08
|
111.86
|
28/02/2023
|
05/03/2023
|
30/05/2023
|
100
|
110.11
|
98
|
30/11/2022
|
|
450
|
SP14194/Anarashia FCD Subproject
|
Rehebilitation of 2Nos Regulator (Size 1V-1.50mX1.80m.) at ch. 5680m & ch. 6530m on Meser Khal. Rehebilitation of 3Nos Pipe Sluice (Size 1V-900mm) at ch. 200m on Betaler khal-1, ch.3235m on Betaler khal-2 & ch. 4125m on Meser Khal. Rehebilitation of 1No. Regulator (Size 2V-1.50mX1.50m.) at ch. 200m on Betaler khal-2 Re-excavation of Betaler Khal-2 (Ch-0+000km to 1+950km) Re-excavation of Betaler Khal-1 (Ch-0+000km to 1+650km) Re-excavation of Meser Khal (Ch-0+000km to 0+750km) Re-excavation of Bausar Khal (Ch-0+000km to 0+500km) Re-excavation of Bangar Khal (Ch-0+000km to 0+500km) Ref. Lined Section 8 Nos. On 5 Khals, And SP Identf. Signboard (2 nos.)
|
SSSWRDP
|
bauphal
|
|
|
168.70
|
95
|
67.76
|
M/S Mohiuddin Ahmed
|
66.64
|
28/11/2023
|
20/02/2024
|
30/04/2024
|
97
|
63.34
|
95
|
30/11/2022
|
|
451
|
SP15345/Rajapur Patilapara FCD Subproject
|
Rajapur-Patilapara Embankment re-sectioning(ch:0.00 - 1000m and 2700m - 3250m) Rajapur Khal re-excavation (Ch:0.00 - 1600m) Kachabunia Khal re-excavation (Ch:0.00 - 450m) Burir Khal re-excavation (Ch:0.00 - 1700m) Rajapur Branch Khal re-excavation (Ch:0.00 - 1180m) Mahish Barir Khal re-excavation (Ch:0.00 - 1250m) Const. of 09 Nos. Ref. lined Section on 5 Khals, SP Identf. sign board 2, SP Area Indication Post 2 Nos. Rehabilitation of Regula. (1V-1.5m x 1.5) on Burir khal, Rehabilitation of 2Nos Regu. (2V-1.5m x 1.5) on Rajapur Branch & Kalia Barir khal, Rehabi. of 2Nos Regulator (1V-1.5m x 1.5) on Arinow & Patilapara Khal
|
SSSWRDP
|
bauphal
|
|
|
7.73
|
78
|
79.46
|
M/S Mohiuddin Ahmed
|
78.05
|
14/11/2023
|
30/01/2024
|
30/04/2024
|
87
|
61.15
|
78
|
30/11/2022
|
|
452
|
SP22027/Dhulia Subproject
|
Dhulia Embankment re-sectioning(ch:350.00 - 2400m, 4870m - 6250m and 11300m - 12790m), Const. SP Identf. sign board 2 Nos. and SP Area Indication Post 2 Nos. Rehabi. of 2Nos Regulator (1v-1.50mx1.50m) on Mondal bari Khal At Ch-12+809Km (emb) and Patuakhali Khal At ch.19+204Km (emb) Rehabi. 1No Regulator (1v-1.50mx1.50m) on Rabaiyer Bazer Khal At Ch-2+850 Maint. of WMCA Office
|
SSSWRDP
|
bauphal
|
|
|
4.92
|
43
|
74.99
|
OTM
|
74.99
|
17/01/2024
|
|
|
22
|
32.54
|
43
|
30/11/2022
|
|
453
|
SP61018/Uttar Char Bishwas Subproject
|
Re-exacavation of Annir Khal (Ch-0+00km to 8+568km) Re-excavation of Char Agosthi Khal (Ch-0+00km to 6+215km) Re-excavation of Modon Hawlader Barir Khal (Ch-0+000km to 2+472km) Ref. Lined Section 19 Nos. On 3 Khals, And SP Identf. Signboard (2 nos.) Construction of WMCA office building
|
SSSWRDP
|
galachipa
|
|
|
17.25
|
96
|
207.38
|
M/S Ayan Enterprise
|
205.65
|
26/12/2021
|
27/03/2022
|
30/04/2022
|
100
|
199.26
|
96
|
30/11/2022
|
|
454
|
SP62053/Guabaria Subproject
|
Re-excavation of Paschim Guabaria Khal (Ch.0+000 to Ch. 3+887 km) Re-excavation of Taltalir Khal (Ch. 0+000 to Ch. 2+207 km) Re-excavation of Puraba Guabaria Khal (Ch.0+000 to Ch. 2+002 km) Re-excavation of Lamnar Khal (Ch. 0+000 to Ch. 1+180 km) Const. of 9 Nos. Ref. lined Section, SP Identification Signboard and Post 2 Nos. and Demarcation Post 22 Nos. Construction of WMCA office
|
SSSWRDP
|
galachipa
|
|
|
9.27
|
85
|
152.11
|
Md.Mohibul Islam
|
149.78
|
27/03/2023
|
28/03/2023
|
30/05/2024
|
96
|
128.22
|
85
|
30/11/2022
|
|
455
|
SP61013/Dakkhin Amragachhia Subproject
|
Re-excavation Gawatala Char Khal (Ch-0+000km to 0+930km) Re-excavation of Napiter Khal (Ch-0+000km to 1+440km) Re-excavation of Hashemer khal (Ch-0+00km to 0+615km) Re-excavation of Jugir khal (Ch-0+000km to 0+915km) Re-exacavation of Kamarer Khal (Ch-0+000km to 1+374km) Re-excavation of Purbo Awra to Pashim Awra khal (Ch-0+000km to 2+800km) Re-excavation of Uttar Awra Mongoler khal (Ch-0+000km to 2+775km) Ref. Lined Section 13 Nos. On 7 Khals, And SP Identf. Signboard (2 nos.) Construction of WMCA office building Const. of Gawatala Khal Box culvert (2v-3.00mx3.50m) at ch.0+010km | 2023-24
|
SSSWRDP
|
mirjaganj
|
|
|
10.82
|
78
|
135.07
|
OTM
|
133.08
|
22/02/2022
|
27/03/2022
|
30/04/2022
|
90
|
104.37
|
78
|
30/11/2022
|
|
456
|
SP62048/Madhya Amragachia Subproject
|
Re-excavation of Bebajia Khal (Ch. 0+000 to Ch. 3+000 km) Re-excavation of Ruitar Khal (Ch. 0+000 to Ch.1+885 km) Re-excavation of Daser Danga Khal (Ch. 0+000 to Ch. 2+256 km) Re-excavation of Molla Barir Khal (Ch. 0+000 to Ch. 1+550 km) Re-excavation of Thakurer Khal (Ch. 0+000 to Ch. 1+710m) Re-excavation Nizam Alir Khal (Ch. 0+000 to Ch. 2+800m) Const. of 14 Nos. Ref. lined Section, SP Indentification signboard and Post 2 Nos. and Demarcation Post 48 Nos. Construction of WMCA office Construction of Thakurer Khal Box culvert (2v-2.80m x 3.70m) at ch.0+625km | 2023-24 Construction of Ruiter Khal Box culvert (1v-3.5m x 3.70m) at ch.0+400km | 2023-24 Construction of Ruiter Khal Box culvert (1v-3.5m x 3.70m) at ch.1+885km | 2023-24
|
SSSWRDP
|
mirjaganj
|
|
|
13.20
|
61
|
209.04
|
OTM
|
206.70
|
27/03/2023
|
28/03/2023
|
30/05/2023
|
72
|
126.79
|
61
|
30/11/2022
|
|
457
|
SP25210/Deuli-Subidkhali Subproject
|
Golkhali Branch Khal re-xcavation (Ch:0.00m - 3000.00m) 2023-24 Charer Khal re-xcavation (Ch:0.00m - 2300.00m) 2023-24 Const. of 07 Nos. Ref. lined Section on 02 Khals, SP Identf. sign board 2, SP Area Indication Post 2 Nos. | 2023-24
|
SSSWRDP
|
mirjaganj
|
|
|
5.30
|
24
|
48.73
|
LCS-3
|
48.73
|
16/05/2024
|
10/06/2024
|
|
25
|
12.16
|
24
|
30/11/2022
|
|
458
|
SP13103/Hetalia-Madarbunia FCD Subproject
|
Patabunia khal re-excavation(ch.00-2200m) Meser Mollar khal re-excavation(ch.00-1000m) Hetalia embankment re-sectioning(ch.1000-4000m) Referenced line section(4 Nos.) WMCA Office and Others Bamboo bridge(2nos)
|
SSSWRDP
|
patuakhali-s
|
|
|
6.20
|
100
|
127.46
|
Md.Kholil Kazi/Abu Hawlader
|
126.28
|
19/03/2019
|
25/07/2019
|
30/04/2019
|
100
|
125.65
|
100
|
30/11/2022
|
|
459
|
SP13104/Barobigha Mollabari FCD Subproject
|
Embankment Re-Sectioning (Ch: 1320.00m-5500.00 m)
|
SSSWRDP
|
patuakhali-s
|
|
|
4.18
|
98
|
84.55
|
syed Nurul Islam/Md Kobir Uddin
|
84.55
|
14/02/2021
|
27/03/2021
|
30/04/2021
|
100
|
83.45
|
98
|
30/11/2022
|
|
460
|
SP15265/Pairakunja FCD Subproject
|
Embankment Re-exca (Ch: 500 - 3227 m, 5600 - 7100 m and 8800 - 10800 m ) 2 SP Identifying Board Repair of Galachipa Khal Regulator (3 Vent) -. Repair of Durgapur Khal Regulator (2 Vent) -. Repair of Kurir Khal Regulator (2 Vent) -. Repair of Hala BashKhali Khal Pipe Sluice (1 Vent) -. Repair of Golabunia Khal Pipe Sluice (1 Vent) -. Durgpur Khal re-xcavation (Ch:0.00m - 2200.00m) 2023-24 Gilabuni Khal re-xcavation (Ch:0.00m - 2050.00m) 2023-24 Eitbaria Khal re-xcavation (Ch:0.00m - 2000.00m) 2023-24 Lakshmipur Shiri Khali Khal re-xcavation (Ch:0.00m - 1600.00m) 2023-24 Const. of 10 Nos. Ref. lined Section on 04 Khals, SP Area Indication Post 2 Nos. | 2023-24 Cons. of Pipe Sluice (1V- 600m dia at Ch. 9+110 km of Embankment.) & Cons. of Pipe Sluice (1V-600m dia at Ch. 10+800 km of Embankment.) 2023-24
|
SSSWRDP
|
patuakhali-s
|
|
|
14.07
|
77
|
219.19
|
President:mokbul hossain
Secretary:ali akbor mirrida
|
199.24
|
28/10/2020
|
28/12/2020
|
30/04/2021
|
60
|
153.45
|
77
|
30/11/2022
|
|
461
|
SP15266/Barabighai DR Subproject
|
Chakar Bari Khal Re-excavation(ch0.00-2500m) Katakhali Khal Re-excavation(ch0.00-1650m) Shadhu Akan Khal Re-excavation(ch0.00-2000m) Shedam Gain Khal Re-excavation(ch0.00-950m) Titkata Khal Re-excavation(ch0.00-1550m) Ref. Lined Section 8 Nos. On 5 Khals, And SP Identf. Signboard (2 nos.)
|
SSSWRDP
|
patuakhali-s
|
|
|
8.65
|
92
|
76.16
|
Sohidul/Nasima
|
76.16
|
27/01/2021
|
27/03/2021
|
30/04/2021
|
100
|
70.72
|
92
|
30/11/2022
|
|
462
|
SP15316/Bhagirabad-Jainkathi FCD Subproject
|
Kalibari khal re-excavation(ch.00-800m) Referenced line section((2 Nos.) Bamboo bridge((1 Nos.) Embankment re-sectioning(ch.00-1800m)
|
SSSWRDP
|
patuakhali-s
|
|
|
2.60
|
95
|
51.85
|
LCS
|
51.85
|
25/09/2018
|
08/01/2019
|
30/09/2019
|
100
|
49.56
|
95
|
30/11/2022
|
|
463
|
SP44143/Hetalia-Ballabhpur Khal Subproject
|
Re-excavation of Hetalia Khal (Ch: 0 m to 2076 m) Re-excavation of Dudhar Khal (Ch: 0 m to 1160 m) Re-excavation of Poshurbunia Khal (Ch: 0 m to 1450 m) Re-excavation of Bausar Khal (Ch: 0 m to 1235 m) Re-excavation of Bahalgachia Khal (Ch: 0 m to 1150 m) Ref line section (5 nos. ) and SP signboard (2 nos.) Charabunia Switch to Miya Bari Ballavpur Khal re-xcavation (Ch:0.00m - 2800.00m) 2023-24 Wazid Bari Katakhali Khal re-xcavation (Ch:0.00m - 2800.00m) 2023-24 Kalam Gazi to Bahalgachiya Bharania Khal re-xcavation (Ch:0.00m - 1800.00m) 2023-24 Const. of 08 Nos. Ref. lined Section on 03 Khals, SP Identf. sign board 2, SP Area Indication Post 2 Nos. | 2023-24
|
SSSWRDP
|
patuakhali-s
|
|
|
14.47
|
98
|
110.01
|
pesident:Mst.Nur-Jahan Begum
Secretary:Md.Yousuf monsi
|
109.98
|
31/03/2024
|
31/03/2024
|
31/05/2024
|
100
|
108.56
|
98
|
30/11/2022
|
|
464
|
SP62050/Saula Subproject
|
Re-excavation of Bhayalar Khal (Ch. 0+000 to Ch. 1+166 km) Re-excavation of Bhuria Khal (Ch. 0+000 to Ch. 2+210 km) Re-excavation of Biler Bari Khal (Ch. 0+000 to Ch. 2+600 km) Re-excavation of Biler Bari Br. Khal (Ch. 0+000 to Ch. 0+387 km) Re-excavation of Boyati Bari Khal (Ch. 0+000 to Ch. 0+880m) Re-excavation of Saula Sikdar Bari Khal (Ch. 0+000 to Ch. 1+160m) Const. of 09 Nos. Ref. Lined Section and SP Identification Signboard Construction of WMCA office
|
SSSWRDP
|
patuakhali-s
|
|
|
8.40
|
98
|
159.72
|
Md.Mohibul Islam
|
155.87
|
27/03/2023
|
28/03/2023
|
30/05/2023
|
100
|
153.93
|
98
|
30/11/2022
|
|
465
|
061/176
|
Construction of Adabaria UP Complex
|
UCCP-2
|
bauphal
|
|
|
|
100
|
111.60
|
|
117.06
|
24/09/2014
|
|
30/12/2015
|
100
|
116.33
|
100
|
06/09/2020
|
|
466
|
060/176
|
Construction of kanakdia UP Complex
|
UCCP-2
|
bauphal
|
|
|
|
|
111.60
|
|
117.06
|
15/10/2014
|
|
30/06/2016
|
100
|
|
|
06/09/2020
|
|
467
|
092/246
|
Construction of Kalaiya UP Complex
|
UCCP-2
|
bauphal
|
|
|
|
100
|
81.00
|
|
85.03
|
01/06/2011
|
|
30/08/2016
|
100
|
84.10
|
100
|
29/07/2020
|
|
468
|
091/246
|
Construction of Nazirpur-taterkhati UP Complex
|
UCCP-2
|
bauphal
|
|
|
|
100
|
81.00
|
|
84.97
|
01/06/2011
|
|
25/06/2015
|
100
|
84.43
|
100
|
29/07/2020
|
|
469
|
093/246
|
Construction of Dashpara UP Complex
|
UCCP-2
|
bauphal
|
|
|
|
100
|
59.00
|
|
55.12
|
18/12/2008
|
|
30/12/2013
|
100
|
54.59
|
100
|
28/07/2020
|
|
470
|
062/176
|
Construction of BETAGISANKIPUR UP Complex
|
UCCP-2
|
dashmina
|
|
|
|
100
|
120.75
|
|
120.75
|
07/03/2013
|
|
06/09/2014
|
100
|
120.75
|
100
|
06/09/2020
|
|
471
|
090/246
|
Construction of Bashbaria UP Complex
|
UCCP-2
|
dashmina
|
|
|
|
100
|
65.18
|
|
65.18
|
06/02/2010
|
|
30/08/2014
|
100
|
62.20
|
100
|
30/07/2020
|
|
472
|
68/176
|
Construction of charbiswas UP Complex
|
UCCP-2
|
galachipa
|
|
|
|
100
|
122.88
|
|
93.50
|
23/06/2016
|
|
30/09/2018
|
100
|
93.50
|
100
|
06/09/2020
|
|
473
|
088/246
|
Construction of dakua UP Complex
|
UCCP-2
|
galachipa
|
|
|
|
100
|
81.00
|
|
87.64
|
03/06/2010
|
|
30/11/2015
|
100
|
87.63
|
100
|
29/07/2020
|
|
474
|
087/246
|
Construction of panpatti UP Complex
|
UCCP-2
|
galachipa
|
|
|
|
0
|
190.37
|
|
185.19
|
26/08/2019
|
|
01/06/2020
|
10
|
0.00
|
0
|
29/07/2020
|
|
475
|
w.464
|
Construction of dabluganj UP Complex
|
UCCP-2
|
kalapara
|
|
|
|
|
127.28
|
|
106.97
|
20/11/2016
|
|
30/08/2018
|
100
|
105.00
|
|
26/08/2020
|
|
476
|
086/246
|
Construction of chakami UP Complex
|
UCCP-2
|
kalapara
|
|
|
|
100
|
81.00
|
|
96.02
|
30/09/2010
|
|
20/12/2014
|
100
|
95.85
|
100
|
28/07/2020
|
|
477
|
085/246
|
Construction of dhankali UP Complex
|
UCCP-2
|
kalapara
|
|
|
|
100
|
81.00
|
|
84.85
|
26/09/2010
|
|
30/09/2015
|
100
|
84.29
|
100
|
28/07/2020
|
|
478
|
084/246
|
Construction of Kalaiya UP Complex
|
UCCP-2
|
kalapara
|
|
|
|
100
|
81.00
|
|
95.69
|
26/09/2010
|
|
30/06/2015
|
100
|
95.51
|
100
|
28/07/2020
|
|
479
|
083/246
|
Construction of nilgonj UP Complex
|
UCCP-2
|
kalapara
|
|
|
|
100
|
81.00
|
|
84.88
|
26/09/2010
|
|
30/06/2015
|
100
|
84.44
|
100
|
28/07/2020
|
|
480
|
082/246
|
Construction of tiakhali UP Complex
|
UCCP-2
|
kalapara
|
|
|
|
100
|
81.00
|
|
84.80
|
29/09/2010
|
|
31/12/2014
|
100
|
84.07
|
100
|
28/07/2020
|
|
481
|
080/246
|
Construction of badarpur UP Complex
|
UCCP-2
|
patuakhali-s
|
|
|
|
100
|
81.00
|
|
84.89
|
19/01/2011
|
|
29/05/2016
|
100
|
84.48
|
100
|
28/07/2020
|
|
482
|
081/246
|
Construction of barobeghai UP Complex
|
UCCP-2
|
patuakhali-s
|
|
|
|
100
|
81.00
|
|
84.99
|
30/05/2011
|
|
29/05/2016
|
100
|
84.97
|
100
|
28/07/2020
|
|
483
|
079/246
|
Construction of Kalaiya UP Complex
|
UCCP-2
|
patuakhali-s
|
|
|
|
100
|
81.00
|
|
84.33
|
19/01/2011
|
|
25/03/2016
|
100
|
84.80
|
100
|
28/07/2020
|
|
484
|
078/246
|
Construction of kalikapur UP Complex
|
UCCP-2
|
patuakhali-s
|
|
|
|
100
|
81.00
|
|
84.99
|
19/01/2011
|
|
25/03/2016
|
100
|
84.97
|
100
|
28/07/2020
|
|
485
|
066/176
|
Construction of barobaisdia UP Complex
|
UCCP-2
|
Rangabali
|
|
|
|
100
|
81.00
|
|
80.90
|
21/09/2010
|
|
30/12/2014
|
100
|
80.47
|
100
|
06/09/2020
|
|
486
|
065/176
|
Construction of rangabali up (remaining) complex
|
UCCP-2
|
Rangabali
|
|
|
|
100
|
92.28
|
|
73.26
|
12/06/2017
|
|
13/05/2018
|
100
|
73.21
|
100
|
06/09/2020
|
|
487
|
089/246
|
Construction of charmontaj UP Complex
|
UCCP-2
|
Rangabali
|
|
|
|
100
|
81.00
|
|
86.03
|
15/09/2010
|
|
12/05/2016
|
100
|
86.03
|
100
|
28/07/2020
|
|
488
|
CBU-100/ Purto-225
|
পটুয়াখালী জেলার বাউফল উপজেলাধীন জয়বাংলা বাজার সড়ক থেকে পাকডাল হাই স্কুল এবং টেকনিক্যাল কলেজ সড়কে ১৬৫০ মিটার চেইনেজে ব্রিজ নির্মাণ রোড আইডিঃ ৫৭৮৩৮৪২৯৩)
|
UHBP
|
bauphal
|
578384293
|
|
24.00
|
0
|
253.26
|
M/S. Shampa Construction-Md. Enayet Hossain(JV)
|
193.35
|
25/04/2021
|
01/05/2022
|
11/01/2023
|
95
|
158.01
|
0
|
28/06/2024
|
|
489
|
CBU-100/ Purto-227
|
পটুয়াখালী জেলার দশমীনা উপজেলাধীন দশমিনা মোল্লারহাট UNR সড়কে বামনি দোকান হইতে UZR তহমিল অফিস সড়কে নলখোলা বাজার ১৬৪ মি. চেইনেজে ব্রিজ নির্মাণ (রোড আইডিঃ ৫৭৮৫২৫২৪৪)
|
UHBP
|
dashmina
|
578525244
|
|
24.00
|
0
|
270.91
|
M/S. Shampa Construction-Md. Enayet Hossain(JV)
|
208.16
|
25/04/2021
|
01/05/2022
|
31/08/2023
|
100
|
195.58
|
0
|
28/06/2024
|
|
490
|
CBU-100/ Purto-230
|
পটুয়াখালী জেলার দুমকি উপজেলার মুরাদিয়া ইউপিসি-লাউকাঠি সড়কে ৭৭০০মি. চেইনেজে শ্রীরামপুর খালের উপর লাউকাঠি-শ্রীরামপুর সড়কের সংযোগ সেতু নির্মাণ (রোড আইডিঃ ৫৭৮৯৬৩০১৫)
|
UHBP
|
dumki
|
578963015
|
|
45.00
|
0
|
561.51
|
M/S. Mohiuddin Ahmed
|
505.36
|
06/04/2022
|
12/04/2023
|
30/12/2024
|
90
|
453.45
|
0
|
28/06/2024
|
|
491
|
CBU-100/ Purto-228
|
পটুয়াখালি জেলার গলাচিপা উপজেলাধীন কোটখালী বাজার রোড খেয়াঘাট-আব্দুল বারেক মিয়া (এম.পি) বাড়ীর সামনে ঘাট রোডে ব্রিজ নির্মাণ। (রোড আইডিঃ ৫৭৮৫৭৫০২৪)
|
UHBP
|
galachipa
|
578575024
|
|
60.00
|
0
|
590.66
|
M/S. Shampa Construction-Md. Enayet Hossain(JV)
|
464.36
|
25/04/2021
|
01/05/2022
|
30/06/2023
|
97
|
439.96
|
0
|
28/06/2024
|
|
492
|
CBU-100/ Purto-423
|
পটুয়াখালী জেলার গলাচিপা উপজেলাধীন বকুলবাড়ীয়া ইউনিয়নের লামনা বড় বাজারস্থ খালে ০০মিটার চেইনেজে (রোড আইডি-৫৭৮৫৭৪১৪০) সেতু নির্মাণ।
|
UHBP
|
galachipa
|
578574140
|
|
36.00
|
0
|
397.37
|
M/S.Abul Kalam Azad
|
351.63
|
02/03/2022
|
26/03/2023
|
15/11/2024
|
85
|
272.87
|
0
|
28/06/2024
|
|
493
|
CBU-100/ Purto-231
|
পটুয়াখালী জেলার সদর উপজেলাধীন তাফালবাড়ীয়া দেলোওয়ার মুন্সীর বাড়ী - বরুলবাড়ীয়া ফুলনেছা জিপি এস ভায়া হাজী কোব্বাত আলী খান বাড়ী সড়কে ৪০০ মিটার চেইনেজে হাজী কোব্বাত আলী খান বাড়ী এর পূর্ব পাশে খালের উপর সেতু নির্মাণ (রোড আইডিঃ ৫৭৮৯৫৪৪১১)
|
UHBP
|
patuakhali-s
|
578954411
|
|
30.00
|
0
|
271.54
|
EFTE.ETCL(Pvt.) Ltd. Horinpala, Bhandaria, Pirojpur.
|
244.38
|
03/07/2022
|
06/07/2023
|
25/10/2024
|
55
|
119.15
|
0
|
28/06/2024
|
|
494
|
CBU-100/ Purto-232
|
পটুয়াখালী জেলার সদর উপজেলাধীন মরিচবুনিয়া ইউনিয়নে নারিকেলতলা খালের উপর ২৭৫০ মিটার চেইনেজে সেতু নির্মাণ। (রোড আইডিঃ ৫৭৮৯৫৩০৩২)
|
UHBP
|
patuakhali-s
|
578953032
|
|
66.00
|
0
|
691.01
|
Mohammed Eunus & Brothers(Pvt.) Ltd
|
621.91
|
03/07/2022
|
09/07/2023
|
30/04/2025
|
65
|
303.18
|
0
|
28/06/2024
|
|
495
|
CBU-100/ Purto-229
|
পটুয়াখালী জেলার রাংগাবালী উপজেলাধীন মতিয়ার রহমান হাউস- চরমার্গারেট সড়কে ৩০০ মিটার চেইনেজে সেতু নির্মাণ (রোড আইডিঃ ৫৭৮৫৮৪০৭২)
|
UHBP
|
Rangabali
|
578584072
|
|
66.00
|
0
|
595.73
|
EFTE.ETCL(Pvt.) Ltd. Horinpala, Bhandaria, Pirojpur.
|
609.92
|
22/06/2022
|
28/06/2023
|
30/06/2024
|
100
|
609.70
|
0
|
28/06/2024
|
|
496
|
UIIP-BC/PCO/W-221
|
A) Contruction of Earth filling & HBB Sarak ward no.-01 Bangabandhu Sarak to ward no.-03 al Modina Jame Mosque via Abdus Samad Jame Mosque under Bauphal Paurosava, District-Patuakhali. Ch. 0.00-1067m.
B) Contruction of RCC Road & Drain from Saha Para existing Drain to Paurosava Bhaban via Councilor Miss Rina Begum House in ward no.-03 under under Bauphal Pourosava, District-Patakhali. Ch.0.00-182m.
C). Construction of RCC Culvert front side of Md. Zakir Surveyer House ward no.-03 under Bauphal Paurosava, District-Patuakhali
|
UIIP
|
bauphal
|
|
1.25
|
1.00
|
100
|
109.72
|
Md. Abul Kalam Azad
|
108.54
|
13/12/2020
|
|
30/05/2022
|
100
|
108.31
|
100
|
08/10/2024
|
|
497
|
UIIP-BC/PCO/W-427
|
A) Construction of RCC Drain front side of master Monir Existing RCC Drain to East side of Haji Golam Mostofa House under BauphalPaurashava in ward No.-08. Ch.0.00-281.00m.
B) Construction of Muslimpara RCC road from R&H Road to Pauro Bhabon at ward No.-03 under Bauphal Paurashava. Ch.0.00-492m.
C) Construction of RCC road from Sher-E-Bangla Sarak to Chan Mia House at word No.-07 under Bauphal Paurashava. Ch.0.00-64.00m.
|
UIIP
|
bauphal
|
|
0.56
|
0.00
|
100
|
147.22
|
M/S Arman Builders & Rupali Construction
|
161.52
|
23/02/2022
|
03/02/2022
|
22/02/2023
|
100
|
161.24
|
100
|
08/10/2024
|
|
498
|
UIIP-BC/PCO/W-428
|
A) Improvement of Carpating Sarak From R&H road to Jommader Bari (Janata Sarak) Ch.0.00-2000.00m at ward No-03 under BauphalPaurashava.
B) Construction of BC road from Muslimpara Poura Bhaban Front side to Fredom Fighter Wayadut Mia Sarak Via Basur Bari in ward No.-03 Under Bauphal Paurashava.Ch.0.00-1400.00m & With 02 Nos Box Culvert.
C) Construction of RCC Culvert on Muslimpara BC Sarak front side of Dr. Ramij Uddin Bari in ward No.-05 under Bauphal Paurashava.
D) Construction of RCC Box Culvert on Muslimpara Sarak Near Bot tola in ward No.-03 under Bauphal Paurashava. at Ch.80m.
|
UIIP
|
bauphal
|
|
3.40
|
5.00
|
100
|
190.91
|
M/S SH Etnr. & Shupty Cons.
|
208.12
|
10/02/2021
|
10/02/2021
|
09/02/2022
|
100
|
207.86
|
100
|
08/10/2024
|
|
499
|
UIIP-BC/PCO/W-558
|
(A). Construction of RCC Road Bangla Bazer to Napter Khal Via Mohila Collage Bridge Approch end side (Mohila Collage Road) under Bauphal Paurashava in ward No-08. Ch.000-562m)
(B). Construction of RCC Road Napiter Khal Culvert road end point to Jor poll RCC Road in ward No-08. Ch.960.00-1128.00=168m).
(C).Construction of RCC Drain Md. Mahadi House Back side to South side Mrs. Rakha Begum front side via Khalil Bari at ward no.09 Under Bauphal Paurashava, Patuakhali. (Ch.000-548.00m).
|
UIIP
|
bauphal
|
|
0.73
|
|
100
|
211.26
|
M/S Arman Builders & Rupali Construction
|
211.01
|
02/02/2023
|
02/02/2023
|
01/02/2024
|
100
|
206.71
|
100
|
08/10/2024
|
|
500
|
UIIP-BC/PCO/W-559
|
A) Improvement of BC Road from R&H road to South side of Poura end area (Sher-E-Bangla Road) in ward no. 07 ( Ch:0.00-885.00m) under Bauphal Paurashava, Patuakhali.
B) Improvement of BC Road from Shre-E-Bangla road to Md. Yousuf Sarder Bari (Bangla Link Sarak) in ward no. 06 ( Ch:0.00-500.00m) under Bauphal Pourashava, Patuakhali
C) Improvement of BC Road from R&H road to North Side Bangla Bazer Bridge under Bauphal Paurashava in ward no. 07 ( Ch:0.00-173.00m) under Bauphal Pourashava, Patuakhali
D) Construction of RCC Road from Dr. Momin Sarak to Md. Aziz Member Bari via Daspara Dakhil Madrasha in ward no. 09 ( Ch:360.00-512.00m=152.00m) and Link road of Aziz Membar Bari ( Ch:0.00-16.50m) under Bauphal Paurashava, Patuakhali .
|
UIIP
|
bauphal
|
|
1.73
|
|
100
|
127.77
|
DEEP-SAHINOOR (JV)
|
127.52
|
23/04/2023
|
30/04/2023
|
29/04/2024
|
100
|
125.49
|
100
|
08/10/2024
|
|
501
|
UIIP-BC/PCO/W-552
|
(a). Construction of shed for public transport Passenger (28.00 spm) at Bauphal Poura Tempu Stand Near H/Q Eng. Faraque North Side od RHD Under Bauphal Pourashava, Patuakhali.
(b). Construction of single storied public Toilet (Type-A) near poraton Samaj kallan Gano Milonatan Under Bauphal Pourashava, Patuakhali
|
UIIP
|
bauphal
|
|
|
|
0
|
55.68
|
M/S Mahatab Enterprise
|
55.47
|
15/02/2024
|
25/02/2024
|
14/02/2025
|
22
|
0.00
|
0
|
08/10/2024
|
|
502
|
UIIP-BC/PCO/W-579
|
(A). Construction of RCC Road from R&H Road to Qazi Nazrul Islam Saroni Via College Mosque (ch.0.00-250.00m) at ward no-03 Under Bauphal Pourashava, Patuakhali.
(B). Improvement of Carpating Road R&H to Bauphal-Patuakhali BC Sarak Via Jommadder Bari (Janata Road) (ch.1096.00-1963.00=867.00m) at ward no-03 Under Bauphal Paurashava, Patuakhali.
"(C). Improvement of Carpating Road from MB Bridge East side slope of Bauphal -Dhandi BC Sarok ( ch.275.00 +
283 .00m+152.00m=710.00m) at ward no-08 Under Bauphal Paurashava, Patuakhali."
(D). Improvement of Carpating road from Nurul Haq Master house to Noni Mistre Bari Via Salaheya Dinia Complex Madrasha at ward no-06 (ch.0.00-470.00m) Under Bauphal Paurashava, Patuakhali.
|
UIIP
|
bauphal
|
|
2.30
|
|
30
|
274.97
|
M/S Shupty Arman-Mahabub (JV) Swapnil
|
274.78
|
05/02/2024
|
15/02/2024
|
04/02/2025
|
67
|
82.62
|
30
|
08/10/2024
|
|
503
|
UIIP/PCO/G-37
|
Implementation & Supply 765 nos Waste Basket (120 ltr) & 10 nos Non-motorized vehicle (van) under Bauphal Pourashava District: Patuakhali.
|
UIIP
|
bauphal
|
|
|
|
0
|
39.97
|
RFL Plastrics Limited
|
25.26
|
|
|
|
0
|
0.00
|
0
|
08/10/2024
|
|
504
|
UIIP-BC/PCO/W-130
|
(a) Contruction of Earth filling & HBB Sarak…… Ch.000-518m
(b) Contruction of Earth filling & HBB Sarak……… Ch.000-548m
(c) Construction of RCC Sarak………. Ch.000-225m
|
UIIP
|
bauphal
|
|
1.29
|
0.00
|
63
|
92.79
|
M/s Hasan Construction & Shupty Construction (JB)
|
91.85
|
14/12/2020
|
14/12/2020
|
30/05/2022
|
100
|
58.43
|
63
|
29/09/2022
|
|
505
|
UIIP-BC/PCO/W-131
|
(a) Contruction of Earth filling & HBB Sarak…… Ch.000-670m
(b) Contruction of Earth filling & HBB Sarak…… Ch.000-396m
|
UIIP
|
bauphal
|
|
1.07
|
0.00
|
100
|
83.10
|
M/S Arman Builders
|
81.85
|
14/12/2020
|
14/12/2020
|
30/05/2022
|
100
|
81.85
|
100
|
29/09/2022
|
|
506
|
UIIP-BC/PCO/W-132
|
(A). Construction of RCC Drain Dr. Abul Kalam Farmacy front side of Bauphal khal in ward-04, under Bauphal Pauroshava, District: Patuakhali. ch.000-170m.
(B). Construction of RCC Drain Md. Sultan Ahammad House to North side of Bauphal Khal via Abdul Khalek Police, Md. Sultan Gazi, Jebon Kormokar in ward-03, under Bauphal Paurosova, District: Patuakhali ch. 000-290
|
UIIP
|
bauphal
|
|
|
0.00
|
100
|
80.62
|
Md. Iqbal Hossain
|
70.00
|
01/09/2020
|
07/09/2020
|
06/09/2021
|
100
|
69.98
|
100
|
29/09/2022
|
|
507
|
UIIP-BC/PCO/W-222
|
Construction of RCC Road & Drain from Romijuddin Sarak to Md. Mannan Khan House ward no.-03 under Bauphal Paurosava, District Patuakhali. Ch. 0.00-475m.
|
UIIP
|
bauphal
|
|
0.46
|
0.00
|
100
|
105.21
|
Md. Jamal Hossain
|
103.64
|
13/12/2020
|
|
19/12/2021
|
100
|
103.60
|
100
|
29/09/2022
|
|
508
|
UIIP-BC/PCO/W-272
|
(a). Construction of BC Sarak Noni Mistary Bari to Md. yousuf Sarder Bari in ward-06, under Bauphal Paurashava, District: Patuakhali. Ch.000-580m
(b). Construction of Hisbullah BC Sarak from yousuf Sarder Bari via Alom Sikder Bari more in ward-06, under Bauphal Paurashava, District: Patuakhali. Ch.000-314m
(c). Construction of BC Sarak from Darun Sunna Sarak to front side of sikder Bari (Bakultala Sarak) in ward-o7, under Bauphal Paurashava, District: Patuakhali. Ch.000-520m
(d). Construction of BC Sarak Dr, momin Sarak to 5ha-E-Bangla Sarak (Assai Sarak) in ward09, under Bauphal Paurashava, District: Patuakhali. Ch.000-488m.
|
UIIP
|
bauphal
|
|
1.90
|
0.00
|
100
|
106.56
|
M/s Sh Enterprise & Shupty Construction (JB)
|
105.41
|
12/04/2021
|
12/04/2021
|
11/04/2022
|
100
|
105.25
|
100
|
29/09/2022
|
|
509
|
UIIP-BC/PCO/W-273
|
(a). Construction of RCC Drain Girl School more to Kali Bari Existing Drain via Sakender pesker, Councilor Kabir, Jarnalist Shohag in ward No-04, under Bauphal Paurashava, District: Patuakhali. Ch.000-415m
(b). Construction of RCC Drain & road R&H sarak to Santh Bag Md, Balayet Kanongo Back side Existing RCC Drain via Rngr. Jafor House in ward No07, under Eauphal Paurashava, District: Patuakhali. Ch.000-177m
|
UIIP
|
bauphal
|
|
|
0.00
|
100
|
121.85
|
M/S Roza & Saom Enterprise - M/S Sawda Enterprise (JV)
|
121.14
|
12/04/2021
|
12/11/2021
|
12/04/2022
|
100
|
121.11
|
100
|
29/09/2022
|
|
510
|
UIIP-BC/PCO/W-274
|
(a). Construction of RCC Digital Sarak to Fakir Bari via A Razzak Fokir, Mulai Fakir, & Athar Gazi in ward-O9, under Bauphal Pauroshava, District: Patuakhali. Ch.000-219m
(b). Construction of RCC Sarak Chairpara Existing RCC road to fredonm fighter AKM khalak mia house in ward -09, under Bauphal Pauroshava, District: Patuakhali. Ch.000-107m.
(c). Construction of RCC Sarak Nazirpur Board School Sarak to Ponchiyed Bari in ward-08, under Bauphal Pauroshava, District: Patuakhali. Ch.000-275m.
(d). Construction of RCC Sarak Nazirpur Board School to Mirda Bari in ward no-08 under Bauphal Pauroshava, District: Patuakhali. Ch.000-141m
(e). Construction of RCC Sarak Kazi Nazrul lslam Saroni Baitul Hamed lame Mosque to Gopal Sill front side Existing RCC road (Sill Para Sarak) via Madop Mondol Bari in ward-03, under Bauphal Pauroshava, District: Patuakhali. Ch.000-348m
|
UIIP
|
bauphal
|
|
1.09
|
0.00
|
100
|
127.60
|
M/S Deip Enterprise
|
127.08
|
12/04/2021
|
12/04/2021
|
11/04/2022
|
100
|
126.85
|
100
|
29/09/2022
|
|
511
|
UIIP-BC/PCO/W-528
|
A) Construction of Shed for Public Transport Passenger (28.00sqm) at ward No.01 Under Kalapara's Pourashava.
B) Construction of One Storied Public Toilet (Type A=56.00sqm) at ward No.02 Under Kalapara's Pourashava.
C) Construction of One Storied Vegetables & Agricultural Product Market of 5 Storied Foundation (Floor Area=314 sqm) at ward No.02 Under Kalapara's Pourashava.
|
UIIP
|
kalapara
|
|
|
0.00
|
100
|
198.83
|
ATC-KCD (JV)
|
167.23
|
07/07/2022
|
13/07/2022
|
12/07/2023
|
100
|
162.42
|
100
|
09/10/2024
|
|
512
|
UIIP-BC/PCO/W-538
|
Construction of Parks and Playgrounds under Kalapara Pourashava. Dist. Patuakhali, (Boundary Wall -117.000m , Surface Drain -131.40m , Footpath-131.40, Gate-02no, Ticket Conner -01no , Food Coner -01 no, Toilet-01 no and Bench-15Nos).
|
UIIP
|
kalapara
|
|
|
|
100
|
124.01
|
M/S Mahmud Kamal, South Sabujbagh, Patuakhali
|
99.94
|
14/09/2022
|
21/09/2022
|
13/09/2023
|
100
|
98.22
|
100
|
09/10/2024
|
|
513
|
UIIP-BC/PCO/W-567
|
Improvement of BC Road from Fery Ghat Chowrasta to Shantibagh Road at Ward No: 01, 02 & 06 Under Kalapara Pourashava , District: Patuakhali(Ch. 0.00-1000m)
|
UIIP
|
kalapara
|
|
1.00
|
|
100
|
92.44
|
MZH-ST (JV)
|
92.37
|
02/08/2023
|
09/08/2023
|
01/08/2024
|
100
|
92.33
|
100
|
09/10/2024
|
|
514
|
UIIP-BC/PCO/W-560
|
Construction of Road by RCC, Starting from RHD Road to Sayed Uddin Super Market via Dak-Bangla Road via Sheikh Kamal Auditorium via Mohila College at Ward No-01 & 02 Under Kalapara Pourahava, Dist: Patuakhali (Ch. 0.00m to 215.00m & 363.00m to 906.00m) Total Length- 758.00m
|
UIIP
|
kalapara
|
|
0.76
|
|
100
|
134.05
|
MD. Kamal Hossain
|
133.57
|
18/07/2023
|
25/07/2023
|
23/04/2024
|
100
|
133.35
|
100
|
09/10/2024
|
|
515
|
UIIP-BC/PCO/W-561
|
A) Construction of RCC Road Starting from WAPDA Road to Sobahan Sikder Model Academy Road at Ward No-09 Under Kalapara Pourahava, Dist: Patuakhali (Ch. 0.00m to 189.00m)
B) (i) Construction of RCC Drain Starting from WAPDA Road Adv. Abdur Rob House via Jahangir Mridha House via Abdul Awal Shannomot to Ferdous Matubbar House at Ward No-08 Under Kalapara Pourahava, Dist: Patuakhali (Ch. 0.00m to 235.00m)
(ii) Construction of RCC Drain Starting from Kalapara Thana to Press Club at Ward No-02 Under Kalapara Pourahava, (Ch. 0.00m to 85.00m)
|
UIIP
|
kalapara
|
|
0.19
|
|
100
|
105.66
|
AT_JAKIR
|
104.96
|
18/07/2023
|
25/07/2023
|
25/07/2024
|
100
|
91.90
|
100
|
09/10/2024
|
|
516
|
UIIP/PCO/G-40
|
Implementation & Supply 863 nos Waste Basket (120 ltr) & 4 nos Non-motorized vehicle (van) under Kalapara Pourashava District: Patuakhali.
|
UIIP
|
kalapara
|
|
|
|
0
|
39.98
|
RFL Plastrics Limited
|
27.43
|
08/02/2024
|
09/02/2024
|
08/06/2024
|
0
|
0.00
|
0
|
09/10/2024
|
|
517
|
UIIP-BC/PCO/W-18
|
Improvement of Soling & Earthen Road by the BC from Toyeb Member house to Mahabub Talukder Sarak Ch.0+00m0+520m = 520.00m at Ward No-08 Under Kalapara's/ Kuakata Pourashava Patuakhali. (Salvage Cost Tk.103664.00)
|
UIIP
|
kalapara
|
|
0.52
|
0.00
|
100
|
85.80
|
M/S Palli Store
|
83.47
|
01/10/2020
|
07/10/2020
|
31/05/2024
|
100
|
73.87
|
100
|
08/10/2024
|
|
518
|
UIIP-BC/PCO/W-170
|
1 Improvement of Earthen Road by the BC from Rahman Kha Mosque To Culvert of Rustum Musully Ch.00 m-690m at Ward No-01 Under Kalapara's/ Kuakata Pourashava. Patuakhali.
2. Construction of 01one Nos of 1-Vent RCC Box Culvart 1.50m x1.80m at Ch- 690m at Ward No -01 Under Kalapara's/ Kuakata Pourashava Patuakhali
|
UIIP
|
kalapara
|
|
0.69
|
1.50
|
100
|
125.73
|
M/S Palli Store
|
111.54
|
05/01/2021
|
05/01/2021
|
31/05/2024
|
100
|
110.09
|
100
|
08/10/2024
|
|
519
|
UIIP-BC/PCO/W-171
|
1.Improvement of Earthen Road by the BC from the house of
Jabber Chawdarys Culvert to Wapda Very Bandth Ch.690m - Ch. 1300m = 610 m at Ward No -01 Under Kalapara's/ Kuakata Pourashava Patuakhali.
2.Construction of UIIP/BC/PCO/W-17201one Nos of 1-Vent RCC Box Culvart 1.50m x1.80mat Ch-1085.00m at Ward No -01 Under Kalapara's/ Kuakata Pourashava Patuakhali.
3. Construction of 01one Nos X-Drain 0.750x1.80m at Ch1147.00m Ward No -01 Under Kalapara's/ Kuakata Pourashava.
|
UIIP
|
kalapara
|
|
0.61
|
1.50
|
100
|
124.65
|
M/S Palli Store
|
110.21
|
05/01/2021
|
05/01/2021
|
31/05/2024
|
100
|
109.07
|
100
|
08/10/2024
|
|
520
|
UIIP-BC/PCO/W-172
|
1. Improvement of Soling & Earthen Road by the BC from Monir Shorif house to Asrayan 03 Three Road More Ch.000m0730m730.00m at Ward No-03 Under Kalapara's/ Kuakata Pourashav Patuakhali.
2. Construction of 01 One Nos of 1-Vent RCC Box Culvart
2.00m x2.50m at Ch-390m Under Kalapara's/ Kuakata Pourashava
Patuakhali
|
UIIP
|
kalapara
|
|
0.73
|
2.00
|
100
|
137.31
|
M/S Palli Store
|
131.14
|
05/01/2021
|
05/01/2021
|
31/05/2024
|
100
|
129.09
|
100
|
08/10/2024
|
|
521
|
UIIP-BC/PCO/W-396
|
Improvement of Earthen Road by the BC from the House of Jabber Chawdary’s Culvert to Wapda Very Bandth at ward No-01, Under Kalapara's/ Kuakata Pourashava. (Ch-1+300m-1+965m)
|
UIIP
|
kalapara
|
|
0.67
|
0.00
|
100
|
114.18
|
M/S Delowar Hossain
|
97.94
|
03/03/2022
|
08/03/2022
|
07/03/2023
|
100
|
97.72
|
100
|
08/10/2024
|
|
522
|
UIIP-BC/PCO/W-397
|
Construction of RCC Road Starting From 03 no. ward Main BC Road (LGED Rest House West Side) to Shohed Nurujjaman Sorok (Via Elish Park).Ward No-07, Under Kalapara's/ Kuakata Pourashava. (Ch.0+000-0+380m)
|
UIIP
|
kalapara
|
|
0.38
|
0.00
|
100
|
104.09
|
Rezwanul Maksud
|
87.88
|
03/03/2022
|
08/03/2022
|
30/04/2024
|
100
|
83.46
|
100
|
08/10/2024
|
|
523
|
UIIP-BC/PCO/W-398
|
A) Construction of RCC Drain Work starting from 80 Ghare Area, Ward No.01, Under Kalapara's/ Kuakata Pourashava. (Ch:0+000-0+572.00m)
|
UIIP
|
kalapara
|
|
|
0.00
|
100
|
51.90
|
M/S Mayer Doya Enterprise
|
43.59
|
03/03/2022
|
08/03/2022
|
07/03/2023
|
100
|
43.54
|
100
|
08/10/2024
|
|
524
|
UIIP-BC/PCO/W-399
|
Construction of RCC Drain Work Starting from 03 no. Ward Main BC Road (LGED Rest House West Side) to Shohed Nurujjaman Sorok, (Via Elish Park), Under Kalapara's/ Kuakata Pourashava. (Ch-0+000-0+985.00m)
|
UIIP
|
kalapara
|
|
|
0.00
|
80
|
177.42
|
M/S Libati Traders & Rezwanul Masud (JV)
|
141.40
|
03/03/2022
|
08/03/2022
|
07/03/2023
|
100
|
113.11
|
80
|
08/10/2024
|
|
525
|
UIIP-BC/PCO/W-400
|
A) Construction of RCC Box Culvert (2x4.00mx3.00m) near at Taher Khan Jame Mosque in Asriaon Ward No. 04, Under Kalapara's/ Kuakata Pourashava.
B) Construction of RCC Box Culvert (1x4.30mx3.00m) near at Mr.Kalam & Mr. Afjal house Side Nabinpur Khal in Word No-06, Under Kalapara's/ Kuakata Pourashava.
|
UIIP
|
kalapara
|
|
|
8.30
|
100
|
71.64
|
M/S Bakshi Enterprise
|
60.58
|
03/03/2021
|
04/03/2021
|
05/03/2022
|
100
|
60.22
|
100
|
08/10/2024
|
|
526
|
UIIP-BC/PCO/W-521
|
A) Improvement of BC Road from Nilonjona Road (Faraje Bari Mosque) to Anchar Camp (Very Bandth) (Ch:0.00-265.00m) Ward No.-07, Under Kuakata Pourashava, Kalapara, Patuakhali.
B) Construction of 01 Nos X-Culvert (Size 1.35mX1.80m) of BC Road from Nilonjona Road (Faraje Bari Mosque) to Anchar Camp (Very Bandth) at Ch:180m, Ward No.-07, Under Kuakata Pourashava, Kalapara, Patuakhali.(dropped)
C) Improvement of Earthen Road by BC from Mala Para 02 No. Ward BC Road To Sorifpur Primary School West side 01 No. Ward BC Road, (via Habib Soref house), (Ch:0.00-290.00m), Ward No-01, Under Kuakata Pourashava, Kalapara, Patuakhali.
D) Construction of 01-Vent RCC Box Culvert (Size: 2.00m x2.50m) of Mala Para 02 No. Ward BC Road To Sorifpur Primary School West side 01 No. Ward BC Road, (via Habib Soref house) at Ch:150m, Ward No -01, Under Kuakata Pourashava, Kalapara, Patuakhali.
E) Construction of RCC Drain starting from 07 No Ward Rakin Market Field No LGED Training Center (Councilor Asraf Sikder House Front Road Side), (Ch.0.00-200.00m), Ward No.-07, Under Kuakata Pourashava, Kalapara, Patuakhali.
|
UIIP
|
kalapara
|
|
0.67
|
2.00
|
88
|
150.38
|
M/S Najmus Shahadat Traders, Patuakhali
|
142.04
|
16/11/2022
|
23/11/2022
|
31/05/2024
|
100
|
125.50
|
88
|
08/10/2024
|
|
527
|
UIIP-BC/PCO/W-522
|
A) Construction of Shed for Public Transport Passenger (28.00sqm) at Kuakata Bus Terminal Front Side Under Kuakata Pourashava.
B) Construction of One Storied Public Toilet (Type A=56.00sqm) at North Panjupara, ward No.08 Under Kuakata Pourashava.
|
UIIP
|
kalapara
|
|
|
|
79
|
47.33
|
M/S Mamun Construction
|
44.59
|
16/11/2022
|
23/11/2022
|
15/11/2023
|
100
|
35.40
|
79
|
08/10/2024
|
|
528
|
UIIP/PCO/G-38
|
Implementation & Supply 500 nos Waste Basket (120 ltr) & 25 nos Non-motorized vehicle (van) under Kuakata Pourashava District: Patuakhali.
|
UIIP
|
kalapara
|
|
|
|
0
|
39.09
|
RFL Plastrics Limited
|
30.00
|
|
|
|
0
|
0.00
|
0
|
08/10/2024
|
|
529
|
UIIP-BC/PCO/W-19
|
1) Improvement of Earthen Road by the BC from Panju Para More To End of Pourashava Area Ch. 2+000m-2+760m = 760m at Ward No-08. Under Kalapara's/ Kuakata Pourashava.Patuakhali.
2) Construction of 01 One No of 1-Vent RCC Box Culvert 1.50mx1.80m Ch.2+00m-2+300m at Ward No-08 Under Kalapara's/ Kuakata Pourashava Patuakhali
|
UIIP
|
kalapara
|
|
0.76
|
1.50
|
68
|
148.31
|
M/S Mamun Construction
|
131.53
|
01/10/2020
|
07/10/2020
|
17/12/2021
|
100
|
89.73
|
68
|
29/09/2022
|
|
530
|
UIIP-BC/PCO/W-93
|
(a) Improvement of road by rigid pavement from Madrasha road via Altaf Mia house to Rafique mia house at ward No.-07 under Kalapara's Pourashava. Ch. 0.00 to 640.00m.
(b) Improvement of road by rigid pavement starting from west side Nur-E Jame Masjed Nesaria Sarak to Sohel Mia house at ward No.-09 under Kalapara's Pourashava. Ch. 0.00 to 513.00m.
|
UIIP
|
kalapara
|
|
1.15
|
0.00
|
68
|
146.81
|
M/S TM Enterprise
|
125.98
|
22/09/2020
|
29/09/2020
|
28/09/2021
|
100
|
86.29
|
68
|
29/09/2022
|
|
531
|
UIIP-BC/PCO/W-94
|
(a) Improvement of RCC road starting from behind Girls school to Adom Ali Master house at ward No.-04 Under Kalapara's Pourashava. Ch. 0.00-230.00m
(b) Improvement of RCC road starting from Kumar Potti road via Naya potti Oilmill Mosjid at ward No.-06 Under Kalapara's Pourashava. Ch. 0.00-240.00m.
(c) Improvement of RCC road starting from Pizus Kanti house via Kishor Vender house to Kobi Nazrul Islam road at ward No.-03 Under Kalapara's Pourashava. Ch. 0.00-340.00m.
(d) Construction of road by rigid pavement from Uttam Karmoker house via Akhrabari to Vojohori Kundo at ward No.-06 Under Kalapara's Pourashava. Ch. 0.00-320.00m.
|
UIIP
|
kalapara
|
|
1.13
|
0.00
|
100
|
98.24
|
M/S Bokshi Enterprise
|
87.82
|
08/09/2020
|
15/09/2020
|
20/09/2021
|
100
|
87.81
|
100
|
29/09/2022
|
|
532
|
UIIP-BC/PCO/W-267
|
(a) (A) Implementation of Road by RCC work from WAODA road Boro Callbari via Kallbari Box Culvert to Fire Service road at ward no- 01 under Kalapara's Pourosava. Ch. 0+000 to 0+930m
|
UIIP
|
kalapara
|
|
0.93
|
0.00
|
100
|
113.12
|
M/S Rupali Construction & Rup Store JV
|
92.93
|
10/01/2021
|
11/01/2021
|
09/01/2022
|
100
|
92.86
|
100
|
29/09/2022
|
|
533
|
UIIP-BC/PCO/W-268
|
(a) Construction of RCC Road starting from WAPDA Road to Dak Bangla at ward no.-02 under Kalapara's Pourosava. Ch. 0+150m
(b) Improvement of road by RCC work from WAPDA Road via Hamid Munshi house to Kumar Patti road at ward no.-06 under Kalapara's Pourosava. Ch. 0+150m.
(c) Improvement of road by RCC work from East side of Sukh ranjan house to Rakha Chandi Khola at ward no.-05 under Kalapara's Pourosava. Ch. 0+150m.
(d) Improvement of road by RCC work in Golab Bagh road at ward no.-03 under Kalapara's Pourosava. Ch. 0+200m.
(e) Construction of RCC Road starting from Kabi Nazrul Islam Road via Army Khalek Mia house to Razzak Miah House at ward no.-03 under Kalapara's Pourosava. Ch. 0+120m
|
UIIP
|
kalapara
|
|
0.77
|
0.00
|
100
|
97.11
|
ATC_ NUR, Puran Bazar, Patuakhali
|
81.00
|
10/01/2021
|
11/01/2021
|
09/01/2022
|
100
|
80.89
|
100
|
29/09/2022
|
|
534
|
UIIP-BC/PCO/W-269
|
(a) Improvement of road by Rigid Pavement starting from Ukil Patti road via Kacha Bazar to WAPDA road at ward no.-02 under Kalapara's Pourosava. Ch. 0+500m.
(b) Construction of RCC Road starting from Razzak Khan house via Girls School to Kabi Nazrul Islam Road at ward no. 04 under Kalapara's Pourosava. Ch. 0+330m.
|
UIIP
|
kalapara
|
|
0.50
|
0.00
|
100
|
109.84
|
Md. Kamal Hossain
|
91.76
|
10/01/2021
|
11/01/2021
|
09/01/2022
|
100
|
91.60
|
100
|
29/09/2022
|
|
535
|
UIIP-BC/PCO/W-270
|
(a)Construction of RCC Drain starting from Kartik Babu house to Bollov Kormokar house at ward no. 05 under Kalapara's Pourosava. Ch. 0+250m.
(b) Construction of RCC Drain starting from west side of Nur Mohammad Sharif house via Jahirul Islam house, Narayon Shill house to Rahmatpur Khal at ward no. 03 under Kalapara's Pourosava. Ch. 0+152m.
(c)Construction of RCC Drain starting from Shamir Pal house to Nimai Sarker house at ward no. 06 under Kalapara's Pourosava. Ch. 0+100m.
|
UIIP
|
kalapara
|
|
|
0.00
|
100
|
91.70
|
Md. Kamal Hossain
|
78.89
|
10/01/2021
|
11/01/2021
|
09/01/2022
|
100
|
78.88
|
100
|
29/09/2022
|
|
536
|
UIIP-BC/PCO/W-271
|
(a)Construction of RCC Drain starting from Upazila Hospital via Ad, chunnu Mia house to Old Drain at ward no. 01 under Kalapara's Pourosava. Ch. 0+500m.
(a)Construction of RCC Drain starting from Madrasa Roadvia Mofij Mia house to Naseria Senior Madrasa at ward no. 07 under Kalapara's Pourosava. Ch. 0+280m.
|
UIIP
|
kalapara
|
|
|
0.00
|
100
|
133.81
|
Md. Kamal Hossain
|
115.92
|
10/01/2021
|
11/01/2021
|
09/01/2022
|
100
|
115.65
|
100
|
29/09/2022
|
|
537
|
UIIP-BC/PCO/W-453
|
Construction of Rigid Pavement from Chinguria via Pourashava Office to Rahmat Pur Road at ward no-04 & 05 under Kalapara's Pourashava. Ch.0.00m to 1500m.
|
UIIP
|
kalapara
|
|
1.50
|
0.00
|
100
|
204.22
|
M/S Rupali Construction
|
166.17
|
31/01/2022
|
07/02/2021
|
30/01/2023
|
100
|
166.05
|
100
|
29/09/2022
|
|
538
|
UIIP-BC/PCO/W-454
|
Construction of RCC drain Starting from Baitul Aman Jame Masjid via Nazrul Islam Sarak to Chinguria road at ward No.-04 under Kalapara's Pourashava.Ch.0.00 to 300m.
|
UIIP
|
kalapara
|
|
|
0.00
|
0
|
63.35
|
M/S Antora Trading co
|
53.36
|
25/01/2022
|
01/02/2022
|
30/01/2023
|
10
|
0.00
|
0
|
29/09/2022
|
|
539
|
UIIP-BC/PCO/W-455
|
A) Construction of RCC 01 ( one) Vent Box Culvert ( 5m x4m x3m) over Kalibari road west side near Yeasin mia House at ward no-01 under Kalapara's Pourashava.
B) Construction of RCC 01 ( one) Vent Box Culvert ( 5m x4m x3m) over Nachnapara Khal near Suny Cottage at ward No.-01 under Kalapara's Pourashava.
C) Construction of RCC 03 ( Three) Vent Box Culvert( 7.55m x3.70m x3m) over Natun Bazar Canal (Atimkhana) near Yosuf mia House at ward No-04 under Kalapara's Pourashava.
D) Construction of RCC Box Culvert (7.8m x 1.5m x 2.4m) Over Chinguria road at ward No.-05 under Kalapara's Pourashava
|
UIIP
|
kalapara
|
|
|
20.00
|
100
|
89.80
|
M/S Rupali Construction
|
73.32
|
25/01/2022
|
01/02/2022
|
30/01/2023
|
100
|
73.02
|
100
|
29/09/2022
|
|
540
|
UIIP-BC/PCO/W-111
|
1 Improvement of Road at Town Kalikapur Amtoly Main Sarok to West Side Gudigata Sarok Via 93 no Govt. Primary School Ch 0.00-450.0 m WordNo-09 Under Patuakhali Pourashava.
2 Improvement of Road at Town Kalikapur 93 no Govt. Primary School to North Side Md. Abu bakor Munci Goni Munci and Ali Munci house Ch0.00-350.0mWord No-09 Under Patuakhali Pourashava.
3 Construction of 5 nos 450m Dia UPVC Pipe wit Inlet Pit at Town Kalikapur 93 no Govt. Primary School to North Side Md. Abu bakor Munci Goni Munci and Ali Munci house Ch0.00-350.0mWord No-09 Under Patuakhali Pourashava.
|
UIIP
|
patuakhali-s
|
|
0.80
|
0.00
|
100
|
145.74
|
M/S Kohinoor Enterprise
|
142.56
|
01/04/2020
|
07/04/2020
|
06/04/2020
|
100
|
142.55
|
100
|
09/10/2024
|
|
541
|
UIIP-BC/PCO/W-112
|
1 Improvement of Road at Chowrasta Mirzagong Sarak Mosque to South Side Polli Bidut Main Highway Ch 0.00-660.0m Under Patuakhali Pourashava.2 Construction of 5 nos Cross Drain 1.00x1.25x8m on Rigid Pavement at Chowrasta Mirzagong Sarak Mosque to South Side Polli Bidut Main Highway Under Patuakhali Pourashava.
|
UIIP
|
patuakhali-s
|
|
0.66
|
0.00
|
100
|
190.17
|
Md. Mizanur Alam
|
193.85
|
23/09/2020
|
|
07/12/2021
|
100
|
192.77
|
100
|
09/10/2024
|
|
542
|
UIIP-BC/PCO/W-220
|
1) Improvement of Road at Middle Kolatola Sarok Maik Gazi house to Poura BC road (Via Aziz gazi house), ch 0.00-780.0m, Word No-09, Under Patuakhali Pourashava.
2) Construction of 1 Nos Nox Culvert at Middle Kolatola Sarok Manik gazi house to Poura BC road (Via Aziz gazi house), ch 0.00-330.0m, Word No-09, Under Patuakhali Pourashava.
3) Construction of 2 nos Cross Drain (1.00x1.25x10m) at Middle Kolatola Sarok Maik Gazi house to Poura BC road (Via Aziz gazi house), ch 0.00-780.0m, Word No-09, Under Patuakhali Pourashava.
4) Construction of 5 nos 450m Dia UPVC Pipe wit Inlet Pit at Middle Kolatola Sarok Maik Gazi house to Poura BC road (Via Aziz gazi house), ch 0.00-780.0m, Word No-09, Under Patuakhali Pourashava.
|
UIIP
|
patuakhali-s
|
|
0.78
|
5.00
|
100
|
135.01
|
Md. Mizanur Alam
|
146.41
|
13/12/2020
|
03/01/2021
|
01/03/2022
|
100
|
165.11
|
100
|
09/10/2024
|
|
543
|
UIIP-BC/PCO/W-450
|
Construction of RCC Drain with footpath at Sabujbag main road from Govt. College Gate-2 to Boy's Hostel with top slab of existing drain in ward No.-04 of Patuakhali Pourashava. (Ch:0.00-500.00m)
|
UIIP
|
patuakhali-s
|
|
|
0.00
|
72
|
191.45
|
M/S Jakaullah & Brothers-M/S Ayan Entr.
|
206.36
|
23/02/2022
|
28/02/2022
|
22/02/2023
|
88
|
149.05
|
72
|
09/10/2024
|
|
544
|
UIIP-BC/PCO/W-562
|
A) Construction of RCC Road starting fromAd, Aziz house to Shimulbag Shahadat house in Ward No.03 of Patuakhali Pourashava (Ch: 0.00-260m) and Link Road (Ch : 0.00-110m & Ch:0.00-90.00m).
" B) Construction of RCC Drain Starting from Ad, Aziz
house to Shimulbag Shahadat house in Ward No,03
of Patuakhali Pourashava (Ch: 0.00-260.00m) and Link
drain (Ch:0-200.00m). "
" C) Construction of RCC Road from Town Joinkati Main
Road to Bagan Bari Road (New Salim Mia Zamia Mosque)
at Ward No : 01 of Patuakhali Pourashava
(Ch: 0.00-145.00m). "
" D) Construction of RCC Drain Starting from Sonali Bank
Turning to Tax Office & 01 No. Cross Drain at Ward
No. 08 of Patuakhali Pourashava (Ch: 0.00-275.00m) "
|
UIIP
|
patuakhali-s
|
|
0.61
|
|
65
|
304.61
|
Gazi Al-Mamun-Ayan (JV)
|
319.48
|
28/03/2023
|
03/04/2023
|
27/03/2024
|
85
|
208.47
|
65
|
09/10/2024
|
|
545
|
UIIP-BC/PCO/W-534
|
A) Construction of Shed for Public Transport Passenger at 4 Lane Road Circuit House South Side of Patuakhali Pourashava
B) Construction of Shed for Public Transport Passenger at 4 Lane Road Sonali Bank South Side of Patuakhali Pourashava
C) Construction of Single Storied Public Toilet Building (Type A) at 4 Lane Road Circuit House South Side of Patuakhali Pourashava
|
UIIP
|
patuakhali-s
|
|
|
|
0
|
69.48
|
M/S Jui Enterprise
|
69.35
|
14/02/2024
|
23/02/2024
|
13/02/2025
|
19
|
0.00
|
0
|
09/10/2024
|
|
546
|
UIIP/PCO/G-39
|
Implementation & Supply 358 nos Waste Basket (120 ltr) & 35 nos Non-motorized vehicle (van) under Patuakhali Pourashava District: Patuakhali.
|
UIIP
|
patuakhali-s
|
|
|
|
0
|
40.00
|
|
0.00
|
|
|
|
0
|
0.00
|
0
|
09/10/2024
|
|
547
|
UIIP-BC/PCO/W-218
|
1. Improvement of Road at Nondokanai- Mirzagong Main Road to North Side Akusha Sarok ( Ch0.00-435.0m) in Ward No-09 Under Patuakhali Pourashava.
|
UIIP
|
patuakhali-s
|
|
0.44
|
0.00
|
100
|
78.06
|
Md. Mizanur Alam
|
109.86
|
28/02/2021
|
03/01/2021
|
28/02/2022
|
100
|
109.86
|
100
|
29/09/2022
|
|
548
|
UIIP-BC/PCO/W-219
|
1 Improvement of Road at Puran Feery Ghat Main Road to South Side Mirzagong Main Road Muktizodda SarokCh 0.00-760.0 m Under Patuakhali Pourashava
|
UIIP
|
patuakhali-s
|
|
0.76
|
0.00
|
100
|
108.55
|
Md. Mizanur Alam
|
138.75
|
28/02/2021
|
03/01/2021
|
28/02/2022
|
100
|
138.74
|
100
|
29/09/2022
|
|
549
|
UTMIDP- DAS /PAT / WR-25
|
1. Improvement of Dashmina UPC- Kharihat via ART College Road by BC at Ch. 00m-726m. Under Dashmina Upazila, Dist: Patuakhali. (Road ID: 578523001) 2.Improvement of Road from Lutfar Rahaman House- Dashmina Khankaa Ch. 00-1120m. under Dashmina Upazila, Dist: Patuakhali. (Road ID: 578525046)
|
UTMIDP
|
dashmina
|
|
1.85
|
|
|
194.29
|
Samim Ahasun - Tanvir Ahmed (JV)
|
187.33
|
|
|
|
0
|
|
|
|
|