SL No. Package No. Package Name Project Name Upazila Name Road ID Length of Road (Km) Length of Bridge (M) Building Qauntity (No) Estimated Amount (Lac) Name of Contractor Contract Amount (Lac) Date of Contract Date of Commencement Date of Completion Physical Progress (%) Financial Progress (Amt) Financial Progress (%) Date of Progress Update Remarks
1 Kala/01/2013 Construction of 668m long Pre-Stressed Girder Bridge with RCC Deck on Kalapara-Baliatali-Gangamati Road over Barobaliatali Andarmanik River under Kalapara Upazila, Patuakhali District. Andermanik kalapara 0.68 930000000.00 MAX-RANKEN (JV) 898385923.49 31/08/2016 30/06/2019 0 Total span 13, each span 5 no. girder. 21 span girders completed out of 65 girders, Slab preparation ongoing. Completion Date: 04-09-2018 Ext 30-06-2019
2 Kala-02/Andhermanik Bridge/Road/2015 Construction of Access Road & Structures of 668m long pre-stressed Girder Bridge over Baliatoli Andhermanik River on Kalapara - Baliatoli - Gangamoti Road at Kalapara Upazila under Patuakhali District. Andermanik kalapara 5.47 163109822.00 BB-MGU JV 0.00 0 Problem on land acquisition [Land acquisition under process]. Due to land acquisition problem site has not been handed over to the contractor. So, work commencement date has not been started.
3 W-PATUA-Kalapara-MC-17-12 Improvement of Chapli Wholesale Market & Collection Center (USAID ID: Y2MC004) at Kalapara, Patuakhali BAIDP kalapara 0.00 Md. Feroz, Fire Service road, Patuakhali 109.38 16/04/2019 10 10/03/2019  
4 W-PATUA-Kalapara-VR-16-22 'Improvement of Dalutpur WAPDA - Pakhimara Bazar Road (USAID ID: Y2RD007,& LGED ID: 578665089) at ch: 0+000 - 4+525Km Total Length= 4.525 Km under Kalapara, Patuakhali BAIDP kalapara 4.53 0.00 M/s. Palli Stors, Town Kalikapur, Patuakhali 386.84 20/03/2019 28 10/03/2019  
5 BDIRWSP/PAT/BAU/DW-21 Widening & Strengthening of Boga RHD-Baharchar GC road at Ch. 0.00-6600m including 04 Nos. 1.00mx1.00m RCC Box Culvert at Ch. 1140m, 2933m, 3600m & 4536m under Bauphal Upazila, District- Patuakhali. Road ID No: 578382002. Salvage Materials Cost Tk. 2517175.00 BDIRWSP bauphal 578382002 6.60 1233.62 JAKAULLAH AND BROTHERS LIMITED Molla Tower, Thana Mour, Jibannagar, Chuadanga 1110.26 0 29/10/2024
6 BDIRWSP/PAT/BAU/DW-22 Widening & Strengthening of Boga RHD-Baharchar GC road at Ch. 6600-13285m including 02 Nos. 1.00mx1.00m RCC Box Culvert at Ch. 7353m, 12954m under Bauphal Upazila, District- Patuakhali. Road ID No: 578382002. Salvage Materials Cost Tk. 2239497.00 BDIRWSP bauphal 578382002 6.69 1164.44 Md. Khairul Kabir Rana S.M.C Road Guptapara, Rangpur 1048.00 0 29/10/2024
7 BDIRWSP/PAT/GAL/DW-01 Widening & Strengthening of Ulania GC-Patabunia GC via Chiknikandi UP road at Ch. 10000-13400m including 01 No. 1.00mx1.00m RCC Box Culvert at 10660m and 01 No. 2-vent 4.00mx4.00m RCC Box Culvert at 11687m under Galachipa Upazila, District-Patuakhali. Road ID No: 578572006. Salvage Materials Cost Tk. 973000.00 BDIRWSP galachipa 578572006 3.40 693.73 EFTE.ETCL (PVT.) LIMITED Horinpala, Bhandaria, Pirojpur 624.36 0 29/10/2024
8 BDIRWSP/PAT/GAL/DW-02 Widening & Strengthening of Ulania GC-Patabunia GC via Chiknikandi UP road at Ch. 13400-17416m under Galachipa Upazila, District-Patuakhali. Road ID No: 578572006. Salvage Materials Cost Tk. 1215790.00 BDIRWSP galachipa 578572006 4.16 682.62 Mohammed Eunus & Brothers (Pvt.) Ltd. Nasirabad, Panchlaish, Chattogram City, Dist: Chattogram 614.36 0 29/10/2024
9 BDIRWSP/PAT/GAL/DW-03 Widening & Strengthening of Ulania GC-Patabunia GC via Chiknikandi UP road at Ch. 17416-21916m including 03 Nos. 1.00mx1.00m RCC Box Culvert at 19413m, 19988m & 21802m under Galachipa Upazila, District-Patuakhali. Road ID No: 578572006. Salvage Materials Cost Tk. 1346558.00 BDIRWSP galachipa 578572006 4.50 835.21 Mohammed Eunus & Brothers (Pvt.) Ltd. Nasirabad, Panchlaish, Chattogram City, Dist: Chattogram 751.69 0 29/10/2024
10 BDIRWSP/PAT/KAL/DW-35 Widening & Strengthening of Boro Baliatali Hat- Latachapali UPC Via Gangamati, Kuakata, Khajura road at Ch. 6640-10140m under Kalapara Upazila, District-Patuakhali. Road ID No: 578663003 BDIRWSP kalapara 578663003 3.50 749.84 Mohammed Eunus & Brothers (Pvt.) Ltd. Eunus Business Centre, Equity G.F. Fortune Mall (7th Fl.), 01 No. Baizid Bostami Road, Nasirabad, Panchlaish, Chattogram 674.85 0 30/01/2025
11 BDIRWSP/PAT/SAD/DW-04 Widening & Strengthening of Itbaria UPC-Shiali Bazer (RHD) road at Ch. 0.00-2770m under Sadar Upazila, District-Patuakhali. Road ID No: 578953023. Salvage Materials Cost Tk. 571088.00 BDIRWSP patuakhali-s 578953023 2.77 461.37 Mohammed Eunus & Brothers (Pvt.) Ltd. Baizid Bostami Road, Nasirabad, Panchlaish, Chattogram 415.23 0 29/10/2024
12 BDIRWSP/PAT/SAD/DW-08 Widening & Strengthening of Kalikapur UP Bohalgachia Pakar Matha to Patuakhali Launch Ghat via 2 Nos Bundth Ghat & Puran bazer road at Ch. 0.00-1415m including 01 No. 2.00mx2.00m RCC Box Culvert at 450m under Sadar Upazila, District-Patuakhali. Road ID No: 578954418. Salvage Materials Cost Tk. 48048.00 BDIRWSP patuakhali-s 578954418 1.42 426.79 Mohammed Eunus & Brothers (Pvt.) Ltd. Eunus Business Centre, Equity G.F. Fortune Mall (7th Fl.), 01 No. Baizid Bostami Road, Nasirabad, Panchlaish, Dist: Chattogram 384.11 0 29/10/2024
13 BDIRWSP/PAT/SAD/DW-05 Widening & Strengthening of Dharandi GC-Patabunia GC via Dewan sharif Darghga (Sadar Part) road at Ch. 0.00-1638m under Sadar Upazila, District-Patuakhali. Road ID No: 578952008. Salvage Materials Cost Tk. 299040.00 BDIRWSP patuakhali-s 578952008 1.64 397.55 Mohammed Eunus & Brothers (Pvt.) Ltd. Eunus Business Centre, Equity G.F. Fortune Mall (7th Fl.), 01 No. Baizid Bostami Road, Nasirabad, Panchlaish, Dist: Chattogram 357.79 0 29/10/2024
14 BDIRWSP/PAT/SAD/DW-06 Widening & Strengthening of Dharandi GC-Patabunia GC via Dewan sharif Darghga (Sadar Part) road at Ch. 1638-3363m under Sadar Upazila, District-Patuakhali. Road ID No: 578952008. BDIRWSP patuakhali-s 578952008 1.73 481.98 Mohammed Eunus & Brothers (Pvt.) Ltd. Eunus Business Centre, Equity G.F. Fortune Mall (7th Fl.), 01 No. Baizid Bostami Road, Nasirabad, Panchlaish, Dist: Chattogram 433.78 0 29/10/2024
15 BDIRWSP/PAT/SAD/DW-07 Widening & Strengthening of Dharandi GC-Patabunia GC via Dewan sharif Darghga (Sadar Part) road at Ch. 3363-5552m including 02 Nos. 1.50mx1.50m RCC Box Culvert at 3874m & 4995m and 03 Nos. 2.00mx2.00m RCC Box Culvert at 3700m, 4680m & 5285m under Sadar Upazila, District-Patuakhali. Road ID No: 578952008. Salvage Materials Cost Tk. 451696.00 BDIRWSP patuakhali-s 578952008 2.19 463.42 Mohammed Eunus & Brothers (Pvt.) Ltd. Eunus Business Centre, Equity G.F. Fortune Mall (7th Fl.), 01 No. Baizid Bostami Road, Nasirabad, Panchlaish, Dist: Chattogram 417.07 0 29/10/2024
16 BDIRWSP/PAT/SAD/DW-11 Widening & Strengthening of Patuakhali UZHQ (Al-Amin Madrasha) to Amkhola UPC via Shehakati Bazar & Purbo Badura Sr. Madrasha road at Ch. 2550-5110m under Sadar Upazila, District-Patuakhali. Road ID No: 578953047. Salvage Materials Cost Tk. 701372.00 BDIRWSP patuakhali-s 578953047 2.56 421.61 Mohammed Eunus & Brothers (Pvt.) Ltd. Eunus Business Centre, Equity G.F. Fortune Mall (7th Fl.), 01 No. Baizid Bostami Road, Nasirabad, Panchlaish, Dist: Chattogram 379.44 0 29/10/2024
17 BDIRWSP/PAT/SAD/DW-10 Widening & Strengthening of Patuakhali UZHQ (Al-Amin Madrasha) to Amkhola UPC via Shehakati Bazar & Purbo Badura Sr. Madrasha road at Ch. 0.00-2550m under Sadar Upazila, District-Patuakhali. Road ID No: 578953047. Salvage Materials Cost Tk. 525840.00 BDIRWSP patuakhali-s 578953047 2.55 397.34 EFTE.ETCL (PVT.) LIMITED Horinpala, Bhandaria, Pirojpur 357.61 0 29/10/2024
18 BDIRWSP/PAT/SAD/DW-12 Widening & Strengthening of RHD (Karmjatala)- Lohalia Bridge via Napit bari Pasurbunia GPS road at Ch. 0.00-1700m under Sadar Upazila, District-Patuakhali. Road ID No: 578954061. Salvage Materials Cost Tk. 368480.00 BDIRWSP patuakhali-s 578954061 1.70 356.76 EFTE.ETCL (PVT.) LIMITED Horinpala, Bhandaria, Pirojpur 321.08 0 29/10/2024
19 BDIRWSP/PAT/SAD/DW-13 Widening & Strengthening of RHD (Karmjatala)- Lohalia Bridge via Napit bari Pasurbunia GPS road at Ch. 1700-3350m under Sadar Upazila, District-Patuakhali. Road ID No: 578954061. BDIRWSP patuakhali-s 578954061 1.65 370.93 Mohammed Eunus & Brothers (Pvt.) Ltd. Eunus Business Centre, Equity G.F. Fortune Mall (7th Fl.), 01 No. Baizid Bostami Road, Nasirabad, Panchlaish, Dist: Chattogram 333.83 0 29/10/2024
20 BDIRWSP/PAT/SAD/DW-14 Widening & Strengthening of RHD (Karmjatala)- Lohalia Bridge via Napit bari Pasurbunia GPS road at Ch. 3350-5000m under Sadar Upazila, District-Patuakhali. Road ID No: 578954061. BDIRWSP patuakhali-s 578954061 1.65 391.08 Mohammed Eunus & Brothers (Pvt.) Ltd. Eunus Business Centre, Equity G.F. Fortune Mall (7th Fl.), 01 No. Baizid Bostami Road, Nasirabad, Panchlaish, Dist: Chattogram 351.97 0 29/10/2024
21 BDIRWSP/PAT/SAD/DW-18 Widening & Strengthening of Patuakhali Lohalia Bridge to Patuakhali Sonali Bazer via Donaban GPS road at Ch. 3749-5793m under Sadar Upazila, District-Patuakhali. Road ID No: 578952010. Salvage Materials Cost Tk. 781256.00 BDIRWSP patuakhali-s 578952010 2.44 429.65 Mohammed Eunus & Brothers (Pvt.) Ltd. Eunus Business Centre, Equity G.F. Fortune Mall (7th Fl.), 01 No. Baizid Bostami Road, Nasirabad, Panchlaish, Dist: Chattogram 386.69 0 29/10/2024
22 BDIRWSP/PAT/SAD/DW-19 Widening & Strengthening of Patuakhali Sadar UZHQ -Ayla GC via Bottolbunia & Khatashia GC (Sadar Part) road at Ch. 0.00-1355m under Sadar Upazila, District-Patuakhali. Road ID No: 578952004. Salvage Materials Cost Tk. 291872.00 BDIRWSP patuakhali-s 578952004 1.36 296.03 EFTE.ETCL (PVT.) LIMITED Horinpala, Bhandaria, Pirojpur 266.43 0 29/10/2024
23 BDIRWSP/PAT/SAD/DW-15 Widening & Strengthening of RHD (Karmjatala)- Lohalia Bridge via Napit bari Pasurbunia GPS road at Ch. 5000-6985m under Sadar Upazila, District-Patuakhali. Road ID No: 578954061. Salvage Materials Cost Tk. 405916.00 BDIRWSP patuakhali-s 578954061 1.99 464.00 EFTE.ETCL (PVT.) LIMITED Horinpala, Bhandaria, Pirojpur 417.60 0 29/10/2024
24 BDIRWSP/PAT/SAD/DW-16 Widening & Strengthening of Patuakhali Lohalia Bridge to Patuakhali Sonali Bazer via Donaban GPS road at Ch. 0.00-2028m (Effective Length=1452.00m) under Sadar Upazila, District-Patuakhali. Road ID No: 578952010. Salvage Materials Cost Tk. 174440.00 BDIRWSP patuakhali-s 578952010 2.28 458.19 Mohammed Eunus & Brothers (Pvt.) Ltd. Eunus Business Centre, Equity G.F. Fortune Mall (7th Fl.), 01 No. Baizid Bostami Road, Nasirabad, Panchlaish, Dist: Chattogram 412.37 0 29/10/2024
25 BDIRWSP/PAT/SAD/DW-17 Widening & Strengthening of Patuakhali Lohalia Bridge to Patuakhali Sonali Bazer via Donaban GPS road at Ch. 2028-3749m under Sadar Upazila, District-Patuakhali. Road ID No: 578952010. Salvage Materials Cost Tk. 231280.00 BDIRWSP patuakhali-s 578952010 1.72 462.84 EFTE.ETCL (PVT.) LIMITED Horinpala, Bhandaria, Pirojpur 416.55 0 29/10/2024
26 BDRIDP/ PAT/BAF/ CCA-RD/01 Improvement of Nawmala UP-Sabupura Bazar-Bauphal-Patuakhali RHD road (Kaderer Garage) by BC at ch.00-1000m. BDRIDP bauphal 1.00 43.85 M/S Kabir Traders. 38.73 100 FBP
27 BDRIDP/ PAT/BAF/ CCA-RD/02 Improvement of Kanakdia UP-Dipasha Bazar-Afsarer Garage-Sabupura Bazar- Nager hat road by BC at ch.0.0m-1000m under Bauphal Upazila. BDRIDP bauphal 1.00 50.28 M/S Tanvir Ahmed. 44.47 100 FBP
28 BDRIDP/ PAT/BAF/ CCA-Rd/03 Improvement of road from Daspara UP Norer road to Kalaiya-Hosnabad road by BC from ch.00-1150m. BDRIDP bauphal 1.15 45.54 M/S. K. K. Enterprise 43.79 29/04/2015 100 FBP
29 BDRIDP/ PAT/BAF/ CCA-Rd(R)/04 Rehabilitation of road from Madanpura UP (Kagojir Pool) Merdar hat-Chandrapara-Chowrasta Bazar (Dhali Asia Khatun Madrasha) Madanpura Union road by BC from ch.00-1900m. BDRIDP bauphal 1.90 95.03 M/S. K. K. Enterprise 92.01 29/04/2015 100 FBP
30 BDRIDP/ PAT/BAF/ CCA-Rd/05 Rehab. Of road from North Soula GPS cum Cyclone Shelter-South Soula GPS cum Cyclone Shelter (UZR Iman Ali Howlader Mosque to Baharampur-WAPDA very Bunth road by BC from ch.1000-2650m BDRIDP bauphal 1.65 66.05 M/S. Tushar Enterprise 55.14 100 FBP
31 BDRIDP/ PAT/BAF/ CCA-Rd(R)/06 Rehab. Of road from North Soula GPS cum Cyclone Shelter-South Soula GPS cum Cyclone Shelter (UZR Iman Ali Howlader Mosque to Baharampur-WAPDA very Bunth road by BC from ch.2650m-3460m BDRIDP bauphal 0.81 32.23 M/S. Tushar Enterprise 26.90 50  
32 BDRIDP/ PAT/BAF/ UN-RD/01 Improvement of Chanropara Chowrasta- Tentulia River road by BC at ch.0.0m-1000m & Const. of 01 No U-Drain at ch.18m under Bauphal Upazila. BDRIDP bauphal 1.00 59.65 M/S Khandakar Brothers. 51.15 100 FBP
33 BDRIDP/ PAT/BAF/ UN-Rd/02 Improvement of road from Kalisuri UP (Kumarkhali Bridge)-Kanakdia Bazar (Kalisuri UP-Shibpur Hazar-Sattar Fakir House-Shibpur Satalight School road) by BC from ch.00-1750m BDRIDP bauphal 1.75 96.71 M/S. Y.A Khan 78.00 100 FBP
34 BDRIDP/ PAT/BAF/ UN-Rd/03 Imp. Of road from Daspara UP-Char Alogi GPS-Moishadi Bazar road by BC from ch.1500-2500m BDRIDP bauphal 1.00 55.58 M/S. K. K. Enterprise 55.13 100 FBP
35 BDRIDP/ PAT/BAF/ UN-Rd/04 Imp. Of road from Kanakdia UP Baultali Bazar- Jhilna Bazar road by BC from 3500m-5100m BDRIDP bauphal 1.60 87.42 M/S. Y.A Khan 71.69 100 FBP
36 BDRIDP/ PAT/BAF/ CCA-Rd/08 Improvement of road from East Side of Dr. Shahalom Talukder House Jame Mosque-Nogorer Hat Yuasub Member House via Nowmala High School road by BC from Ch. 00-510m (ID No. 578384274) under Bauphal, Patuakhali. BDRIDP bauphal 0.51 32.59 Dr. A. Khaleq Bishwas 25.53 50  
37 BDRIDP/ PAT/BAF/ CCA-Rd/09 Improvement of road from Shabupura Tulatola Bor Sikder Bari-Dasher Howla UZR Connecting road by BC from Ch. 2750-4100m with 02(Two) Nos. U-Drain at Ch. 2860m & 3275m (ID No. 578385057) under Bauphal, Patuakhali. BDRIDP bauphal 1.35 77.27 Md. Akhtaruzzaman 68.77 50  
38 BDRIDP/PAT/BAF/CCA-Rd/07 Improvement of road from Jamalkhati road-Oytizobahi Dighir Ghat & Kobor Stan via Advocate Nazrul Islam House road by CC work from Ch. 00-100m under Bauphal, Patuakhali. BDRIDP bauphal 0.10 3.14 M/S. Munia Enterprise 1.87 100 FBP
39 BDRIDP/PAT/BAF/CCA-Rd(R)/10 Rehabilitation of road from Bauphal UPC (Sher-E-Bangla Road)-Naomala BDC Bazar Road via Olipura Bazar East Side (Bilbilash Miah Bari Mr. M. K Raman's House) road By BC from Ch. 00-300m (ID No.578383021) BDRIDP bauphal 0.30 17.60 Md. Azaher Uddin 14.98 100 FBP
40 BDRIDP/PAT/BAF/UN-Rd/05 Improvement of Road from Kalisuri UPC Kumarkhali Bridge-Nurainpur Bazar via Kanakdia Bazar by BC at Ch. 1750m-2750m and including 3 Nos 1.60mX1.60m RCC Box Culvert at Ch. 1945.00m 2260.00m & 2530.00m ID No 578383001 BDRIDP bauphal 1.00 67.04 Md. Firoz 60.34 100  
41 BDRIDP/PAT/BAF/CCA-Rd/11 Improvement of Road from Karkhana Lanch Ghat -Karkhana Manik Gazi Bari (Karkhana High School West side of Fouekan Munsi Shop to Karkhana Senior Madrasha via previous Poura Chairmain Abdul Haque Mia Bari & Karkhana Lunch Ghat From Ch.0.00m-550.00m By HBB i BDRIDP bauphal 0.55 0.00   0.00 0 Evaluation under process
42 BDRIDP/PAT/BAF/CCA-Rd/12 Improvement of road from Mominpur Biswas Bari-Saber Howlader Bari- Sikder Bazar road from Ch. 600.00-1600.00m including 1No. 1.00mx1.00m RCC Box Culvert at Ch. 1510.00m & 2 Nos. U-drain at Ch. 785.00m & 915.00 ( ID No. 578385150) BDRIDP bauphal 1.00 65.18 Md. Khair Hossain 67.81 40  
43 BDRIDP/PAT/BAF/CCA-Rd/13 Improvement of road From Kalishuri-Chandkati H/School Kasobpur Bazar by BC at Ch. 1000m-1770m including 01 Nos. 1.00mx1.00m RCC Box Culvert at ch. 1175m & 1 No. U-Drain at Ch. 1308m. (ID No. 578384033) BDRIDP bauphal 0.77 60.47 M/S. Islam Brothers 54.42 60  
44 BDRIDP/PAT/BAF/CCA-Rd/14 Improvement of road From Kanakdia Kachipara (Bader hat) - Hisbullah Bazar (Mohosin Sepahi Bari) by BC at Ch. 00m-1500m including 03 Nos. 1.00mx1.00m RCC Box Culvert at ch. 437m, 732m & 831m and 04 Nos U-Drain at Ch. 250m, 510m, 1221m, 1450m. (ID No. 57838 BDRIDP bauphal 1.50 109.40 M/S. Mohiuddin Ahmed 102.74 25  
45 BDRIDP/PAT/BAF/CCA-Rd/15 Improvement of road From gonsinga (RHD) - Rasidea Madrasha - Bilbilash Molla Bari Bridge by BC at Ch. 00m-1215m including 02 Nos. 1.00mx1.00m RCC Box Culvert at ch. 20m, 676m and 03 Nos U-Drain at Ch. 145m, 380m, 1155m. (ID No. 578384103) BDRIDP bauphal 1.22 87.98 M/S. Najmus Shahadat Traders 87.88 15  
46 BDRIDP/PAT/BAF/CCA-Rd/16 Improvement of road From Uttar Modonpura Islamia Dakhil Madrasha - Daroga bari -via golam Mostafa Chairman House by BC at Ch. 2000m-3680m including 01 No. 2.00mx2.00m & 01 No. 1.00mx1.00m RCC Box Culvert at ch. 750m and 3660m. (ID No. 578384223) (Salvage BDRIDP bauphal 1.68 113.06 M/S. Tanvir Ahmed 109.51 0  
47 BDRIDP/PAT/BAF/CCA-Rd/17 Improvement of road From Madonpura Kanakdia UNr road (Shader bari Jame Mosque) -Kanakdia UPC - Chandrapara Bazar UNR Road connecting via Engr. Atikur Rahman House by BC at Ch. 500m-2110m including 02 Nos. 1.00mx1.00m RCC Box Culvert at Ch. 745m, 1325m & 0 BDRIDP bauphal 1.61 105.89 M/S. K. K. Enterprise 104.91 60  
48 BDRIDP/PAT/BAF/CCA-Rd/18 Improvement of road From Boga Sabupura BC road to Sabupura GPS Via Sabupura Mother & Child Hospital by BC at Ch. 950m-1678m including 01 No. 1.00mx1.00m RCC Box Culvert at Ch. 1165m. (ID No. 578384352) BDRIDP bauphal 0.73 0.00   0.00 0 Re-Tender
49 BDRIDP/PAT/BAF/CCA-Rd/19 Improvement of road From Boga UP Chairman Ahmmed Hpuse Mosque to Sabupura GPS - North side of Serjen Ali Mridha House by BC at Ch. 810m-1200m including 01 No. 2.00mx2.00m RCC Box Culvert at Ch. 1140m. (ID No. 578385103) BDRIDP bauphal 0.39 0.00   0.00 0 Re-Tender
50 BDRIDP/PAT/BAF/UN-Rd/06 Improvement of Road from Daspara UPC Moishadi Bazar via Char Alogi GPS Road by BC at Ch. 850m-1500m & 2500m-2850m including 01 No 3.00mX3.00m RCC Box Culvert at Ch. 2050m (ID No. 578383044) (Salvage: BDT: 1432898.00) BDRIDP bauphal 0.65 73.94   0.00 0 Tender Received
51 BDRIDP/ PAT/BAF/ UN-St/01 Const. of 02 Nos (1.60mX1.60) RCC Box Culvert on the road from Chanropara Chowrasta Tentulia River road at ch.1360m & 2030m. BDRIDP bauphal 6.07 M/S Khandakar Brothers. 4.71 100 FBP
52 BDRIDP/ PAT/BAF/ UN-St/02 Const. of 1 No. 1.60mX1.60m Box culvert and 1No U-Drain Kalisuri UP (Kumarkhali Bridge)-Kanakdia Bazar-Nurainpur Bazar (Kalisuri UP-Shibpur Hazar-Sattar Fakir House-Shibpur Satalight school road) at ch.1100m & 1650m. BDRIDP bauphal 3.96 M/S. K. K. Enterprise 3.72 100 FBP
53 BDRIDP/ PAT/BAF/ UN-St/03 Const. of road from 3 Nos 1.60mx1.60m Box culvert on Kanakdia UP Baultali Bazar-Jhilna Bazar road at ch.313m, 815m & 1153m. BDRIDP bauphal 9.62 Suresh Chandra Bishwas 7.50 100 FBP
54 BDRIDP/ PAT/BAF/ CCA-St/01 Const.of road from 1No 1.60mX1.60m Box Culvert and 1 No U-Drain on Daspara UP Norer road to Kalaiya-Hosnabad road at ch.750m & 1095m BDRIDP bauphal 3.96 M/S. K. K. Enterprise 3.73 100 FBP
55 BDRIDP/ PAT/BAF/ CCA-St/02 Const. of road from 3 Nos 1.60mX1.60m Box culvert and 1No U-Drain on Madanpura UP (Kagojir Pool) Merdar hat-Chandrapara-Chowrasta bazar (Dhali Asia Khatun Madrasha) Union road at ch.235m, 1205m, 1620m & 944m. BDRIDP bauphal 9.50 M/S. Auditi Enterprise 7.65 100 FBP
56 BDRIDP/ PAT/BAF/ CCA-St/03 Const. of 1No 1.60mx1.60m Box culvert & 1No U-Drain on North Soula GPS cum cyclone shelter-South Soula GPS cum Cyclone shelter (UZR Iman Ali Howlader Mosque to Baharampur-WAPDA very Bunth) road at ch.2202m & 2112m BDRIDP bauphal 3.96 M/S. Munia Enterprise 3.01 100 FBP
57 BDRIDP/PAT/BAF/UZ-St/01 Construction of 20.00m RCC Girder Bridge on Boga Bauphal RHD (Shaplakhali) to Kalisuri GC via Kanakdia Hat Road at Ch. 12+290km (Road ID No. 578382004) BDRIDP bauphal 150.35 M.M. Builders & Engineers Ltd. 135.32 40  
58 BDRIDP/PAT/BAF/UZ-St/02 Construction of 20.00m RCC Girder Bridge on Mominpur GC - Baherchar GC via Kalisuri GC Road at Ch. 13+680km (Road ID No. 578382005) BDRIDP bauphal 164.89 M.M. Builders & Engineers Ltd. 148.40 40  
59 BDRIDP/PAT/BAF/UZ-St/03 Construction of 15.00m RCC Girder Bridge on Boga Bauphal RHD (Shaplakhali) to Kalisuri GC via Kanakdia Hat Road at Ch. 14+990km (Road ID No. 578382004) BDRIDP bauphal 124.78 M.M. Builders & Engineers Ltd. 112.30 30  
60 BDRIDP/PAT/BAF/UZ-St/04 Construction of 15.00m RCC Girder Bridge on Boga Bauphal RHD (Shaplakhali) to Kalisuri GC via Kanakdia Hat Road at Ch. 15+980km (Road ID No. 578382004) BDRIDP bauphal 124.07 M.M. Builders & Engineers Ltd. 111.66 30  
61 BDRIDP/PAT/BAF/CCA-Rd/20 Improvement o Road from Alogi River-Sultanabad Bazar-Dandi GPS Road By BC at ch. 00.00m-1860.00m including 01 No 1.00mx1.00m, 01 No 3.00mx3.00m RCC Box Culvert at Ch. 1036.00m, 1860.00m & 2Nos U- Drain at Ch 1248.00m, 1570.00m. (ID No. 578384123) BDRIDP bauphal 1.86 0.00   0.00 0 Evaluation under process
62 BDRIDP/PAT/GAL/UZ-Rd/01 Improvement of road from Kalagachia GC-Patabunia GC (Kharizzama-Bazar UZR-Patabunia GC) Road by BC at Ch. 0.00-2000 m (Old ID no: 578572003),(New ID no: 578574201) BDRIDP dashmina 2.00 114.10 Shafiqur Rahman 91.83 100 FBP
63 BDRIDP/PAT/GAL/UZ-Rd/02 Improvement of road from Badura GC- Gazipur Gc ( Badhura GC-Julakha Bazar RHD) road by BC at Ch. 200-3200m (ID no. 578572005) (Salvage: BDT: 26,85,106.00) BDRIDP dashmina 3.00 213.46 Md. Firoz 170.00 85  
64 BDRIDP/PAT/GAL/UZ-Rd/03 Improvement of Kalagachia GC-Patabunia GC Kharizzama Bazar UZR-Patabunia GC road by BC from ch.2000.00m-4000.00m. ID No. Old 578572003 New 578574201 Salvage Cost Tk. 434417.00 BDRIDP dashmina 2.00 130.44 Shafiqur Rahman 117.40 100 FBP
65 BDRIDP/PAT/GAL/UZ-Rd/04 Improvement of Badura GC-Gazipur GC Badura GC - Julakha Bazar RHD road by BC from ch. 5200.00m-7750.00m including 3 Nos 2.00mx2.00m RCC Box Culvert at ch. 6260m 6470m & 7070m. ID No. 578572005 BDRIDP dashmina 2.55 205.67 Md. Firoz & Abdul Satter Howlader (JV) 187.05 50  
66 BDRIDP/PAT/GAL/CCA-Rd/01 Improvement of road by bothside Widening by Bitumenous Carpeting from Chottosiba UZR-Barosiba Launch Ghat (Ferry Ghat Road) at Ch. 1700m-3905m & 6300m-7100m including 01 No 1.50mX1.50m RCC Box Culvert at Ch. 3850m (ID No. 578574209) BDRIDP dashmina 2.21 180.36 M/S. Palli Stors 169.66 0  
67 BDRIDP/PAT/GAL/UZ-St/01 Construction of 4.00mX4.00m 2-Vent RCC Box Culvert on Badura GC-Gazipur GC (Badura GC-Julakha Bazar RHD) Road At Ch. 3240.00m (ID No: 578572005) BDRIDP dashmina 29.15 M/S. Talukder Enterprise 20.99 0 Dropped
68 BDRIDP/PAT/GAL/UZ-St/02 Construction of 42.06m RCC Girder Bridge on Badura GC-Julakha Bazar RHD Road at Ch. 11283m, [Road ID: 578572005] BDRIDP dashmina 268.59 M/S. Amir Engineering Corporation-M.M. Builders & Engineers Ltd.-M/S. Niaz Traders-JV 241.73 10  
69 BDRIDP/ PAT/DUM/ CCA-Rd/01 Improvement of road from Angaria (RHD Baherchar Ferry Ghat Janab Rubul Amin Howlader Honarable MP)-Old Patabunia Bazar road by BC from ch.00-600m. BDRIDP dumki 0.60 28.76 M/S. K. K. Enterprise 28.55 100 FBP
70 BDRIDP/ PAT/DUM/ CCA-Rd(R)/02 Rehabilitation of road from Angaria (RHD Baherchar Ferry ghat Janab Ruhul Amin Howlader Honorable MP)-Clinic road by BC from ch.00-258m. BDRIDP dumki 0.26 12.74 M/S. K. K. Enterprise 12.43 100 FBP Salvage 486814
71 BDRIDP/PAT/DUM/CCA-Rd/03 Improvement of Utter Muradia Cyclone Shelter connecting road under Dumki Upazila. (Ch. 0.00-400.00m) (Salvage amount Tk. 264289.00 (Fixed)) BDRIDP dumki 0.40 23.80 M/S. Melanium Traders 18.39 100 FBP
72 BDRIDP/PAT/DUM/CCA-Rd/04 Improvement of Dumki Satani GPS cum Cyclone Shelter connecting road.. (Ch. 0.00-450.00m) (Salvage amount Tk. 196726.00 (Fixed)) BDRIDP dumki 0.45 25.58 M/S. Melanium Traders 19.83 100 FBP
73 BDRIDP/PAT/DUM/CCA-Rd/05 Improvement of Muradia Santos Member Bari-Uttar Wapda Verry Bandh via Razzak Pada House Road by BC at Ch. 00m-850m & Link Road Ch. 00m-150m Including 2 nos 1.00mX1.00m RCC Box Culvert at Ch. 343.00m & 750.00m ID No. 578964123 Salvage Cost BDT219430.00 BDRIDP dumki 0.85 63.74 Lutfa Construction 57.37 50  
74 BDRIDP/PAT/DUM/UZ-Rd/01 Improvement of road from Muradia UP-Laukathi UP via South Khali GPS & Bhoktobari A Salam Doctor Abari via Mozumder Hat road by BC at Ch.0.00m-2000.00m Old ID No- 578962003 New ID No. 578964015 BDRIDP dumki 2.00 111.80 M/S. Amir Engineering Corporation 100.62 65  
75 BDRIDP/PAT/DUM/CCA-Rd/06 Improvement of road from Labukhali-Boga RHD Chorgorobdi Free Ghat-Amir Hossain Howlader Bazar launch Ghat via A. Kashem High School by BC at Ch.0.00.m-2000.00m Including 3 Nos 1.50m x 1.50m RCC Box Culvert at Ch. 1458.00m 1798.00m & 1918.00m Old ID No-578 BDRIDP dumki 2.00 139.80 Md. Enayet Hossain 125.82 100  
76 BDRIDP/PAT/DUM/CCA-Rd/07 Improvement of road from Jamla Bazar-Kalbari Bazar Gabtali Bazar-Sreerampur Dakatia Khalgora via Talukder Hat road by BC at Ch.0.00m-1000.00m ID No-578964135 BDRIDP dumki 1.00 58.36 M/S. Niaz Traders 52.52 35  
77 BDRIDP/PAT/DUM/CCA-Rd/08 Improvement of road from Board Office Bridge-Gabtoli Bazar via H/O Salam Mridha West side of Bridge- Gabtoli Hat via Salampur Fazil Madrasha by BC at CH.0.00m-1000.00m ID No-578964041 BDRIDP dumki 1.00 59.95 M/S. Niaz Traders 53.95 65  
78 BDRIDP/PAT/DUM/CCA-Rd/09 Improvement of road from Labukhali Bauphal RHD Taltali Chowrasta-Char Boyra High School road by BC at Ch.0.00m-500.00m Including 1 No 1.00 x 1.00m RCC Box Culvert at Ch. 135.00m ID No-578964047Salvage Cost 349064.00 BDRIDP dumki 0.50 34.81 M/S. Niaz Traders 31.33 42  
79 BDRIDP/PAT/DUM/CCA-Rd/10 Improvement of road from Atharogachia Mojibor Sikder Bari-Karthikpasha UZR road by BC at Ch.0.00m-1000.00m Including 1 No 4.00m x 4.00m 2 Nos 1.00m x 1.00m RCC Box Culvert at Ch. 536.00m 155.00m & 900.00m ID No-578964155 BDRIDP dumki 1.00 84.01 M/S. Niaz Traders 75.61 15  
80 BDRIDP/PAT/DUM/CCA-Rd/11 Improvement of road from Pangasi Noldoani High School & GPS - H/O Jennta Ali Gazi Mosque road by BC at Ch.0.00m-1000.00m Including 1 No 1.50m x 1.50m RCC Box Culvert at Ch. 476.00m ID No-578965071 BDRIDP dumki 1.00 61.12 M/S. Niaz Traders 55.01 20  
81 BDRIDP/PAT/DUM/CCA-Rd/12 Improvement of Road from United Mohila College-Wazed Ali Howlader Jum-E-Mosque (Uttar Sreerampur H/S, GPS-Rajakhali Bazar at Ch. 00m-414m by BC & Ch. 414m-1000m by HBB including 3 Nos 1.00mx1.00m RCC Box Culvert at Ch. 4.00m, 330.00m & 842.00m (ID No. 578 BDRIDP dumki 0.41 63.48 M/S. Md. Delowar Hossain 60.31 0  
82 BDRIDP/PAT/KAL/UN-Rd/01 Improvement of road from Kalapara-Teakhali Bazar-Madhaya Teakhali Ghat bazar road by BC form ch. 5050-7300m with 3 Nos U-Drain at Ch. 6430m, 6573m & 6950m under Kalapara, Patuakhali. BDRIDP kalapara 2.25 129.03 Md. Bashir Uddin 112.88 100 FBP
83 BDRIDP/PAT/KAL/CCA-Rd/01 Improvement of road by 25mm dense Carpeting on Omedpur GPS cum Cyclone Shelter road from ch. 0.00m-1500.00m with 01 No. U-Drain (0.600mx0.600m) at ch. 720.00m BDRIDP kalapara 1.50 89.57 M/S. Yousuf Ali 78.92 100 FBP
84 BDRIDP/PAT/KAL/GC/01 Improvement of Alipur Bazar at Latachapli Union, Kalapara, Patuakhali. BDRIDP kalapara 50.93 S. Ananta Bikash Tripura 45.84 10  
85 BDRIDP/PAT/MIR/UZ-Rd/02 Improvement of road from Voyang GC - Ayla GC (Habib Bazar) by BC from Ch. 1850.00m-2850.00m. (ID No. 578762007) BDRIDP mirjaganj 1.00 69.42 Sayed Md. Sohel 60.70 55 28 days notice
86 BDRIDP/PAT/MIR/UZ-Rd(R)/01 Rehabilitation of road from Voyang GC-Ayla GC (Habib Bazar) by BC from Ch. 0.00m-1850.00m including 3 nos. 2.00mx2.00m RCC Box Culvert at Ch. 509m, 1248m & 1641m. (Salvage Cost: Tk. 3056224.00) (ID No. 578762007) BDRIDP mirjaganj 1.85 154.19 Kinnary Construction 125.09 100  
87 BDRIDP/PAT/MIR/CCA-Rd/02 Improvement of Road from UZR near Charkhali GPS at Deuly Bererdon River (Chatra GPS) by BC from Ch. 0.00m-1450.00m. (ID No. 578765080) BDRIDP mirjaganj 1.45 80.39 Kinnary Construction 67.42 30  
88 BDRIDP/PAT/MIR/CCA-St/01 Construction of 9.15m OFC bridge on UZR near Chairkhali GPS at Deuly UP - Barrardone River (Chatra GPS) road at Ch:0.00m (Road ID No. 578765080) BDRIDP mirjaganj 25.50 M/S. Soma Enterprise 19.51 100  
89 BDRIDP/PAT/MIR/UZ-St/01 Construction of 21.00m long RCC Girder Bridge on Voyang GC-Ayola GC (Habib Bazar) Road at Ch. 3858m. (ID No-578762007) BDRIDP mirjaganj 148.44 M/S. Sikder Enterprise (Moyazzem) 141.02 0  
90 BDRIDP/PAT/MIR/CCA-Rd/03 Improvement of Road from R&H at East Bazita Club-H/O Bazlu Bayati-Munshirhat Road by BC at Ch. 00m-1000m including 02 Nos 1.50mx1.50m & 01 No 4.00mx3.50m RCC Box Culvert at Ch. 450m, 624m & 90m under Mirjagonj, Patuakhali. (ID No. 578764049) BDRIDP mirjaganj 1.00 99.91 M/S. Md. Delowar Hossain 94.92 0  
91 BDRIDP/PAT/MIR/CCA-Rd/04 Improvement of Road from Labubunia H/O Wazed Khan-Talukder Bari-H/O Nurmohammad Road by BC at Ch. 00m-1000m including 02 Nos 1.50mx1.50m & 01 No. 4.00mx3.50m RCC Box Culvert at Ch. 183m, 450m & 710m under Mirjagonj, Patuakhali. (ID No. 578765056) BDRIDP mirjaganj 1.00 96.36 M/S. Gazi Construction (Ahsan) 91.54 0  
92 BDRIDP/PAT/MIR/CCA-Rd/05 Improvement of Road from RHD at Humraibunia UZR Saylabunia road via south Jatibunia GPS-H/Q Kader Sikder Road by BC at Ch. 660m-1920m including 03 Nos 1.50mx1.50m & 01 No 2.00mx2.00m RCC Box Culvert at Ch. 77m, 171m 480m & 708m (ID No. 578765012) under Mi BDRIDP mirjaganj 1.26 103.37 M/S. Jannatul Ferdous Traders 100.03 15  
93 BDRIDP/ PAT/SAD/ CCA-Rd/01 Imp. Of road from Moukaran UNR road start Purbo Talikhali Mazibar dokan-North side Kafulabunia khal-Daritaluk P/S & H/S road via Abdul Latif Howlader bari road by HBB from ch.00-1500m. BDRIDP patuakhali-s 1.50 35.00 Md. Shafiqur Rahman 30.80 100 FBP
94 BDRIDP/ PAT/SDR/ CCA-RD/02 Improvement of road from Pangashia UP-Gazipur R&H (Bus Stand)-Jamla road upto Sreerampur Sluice Gate road by BC from ch.4228-5724m BDRIDP patuakhali-s 1.50 76.41 M/S. Selim Stores 71.83 100 FBP
95 BDRIDP/ PAT/SAD/ CCA-Rd/03 Imp. Of road from Low Kathi Officer hat to Kaler hat via Kismat Moukarn Primary School road by BC from ch.1400-3116m BDRIDP patuakhali-s 1.72 79.96 Md. Jasim Uddin Khan 71.84 100 FBP
96 BDRIDP/ PAT/SAD/ CCA-Rd/04 Imp. Of road from Moukaran UZR road via Jabber Sikder bari via Fakir Bari-Rashid Kazi Bari via Muktijodda Yousuf Kazi bari-Moukarn Bazar Gazipur road by HBB from ch.00-1215m BDRIDP patuakhali-s 1.22 34.64 M/S. Hima Bricks 29.81 100 FBP
97 BDRIDP/PAT/SAD/CCA-Rd/07 Improvement of road from Showla Baily Bridge-Full Sharif Bazar via Mazi Bari-pachim Vaila Madrasha-Vaila RNGPS road By HBB from Ch.3000-4200m with 1 No U-Drain (625mmx625mm) at Ch.4200m (ID No. 578954111) BDRIDP patuakhali-s 1.20 40.09 M/S. Hima Bricks 39.97 100 FBP
98 BDRIDP/PAT/SAD/CCA-Rd/05 Improvement of road from Jainkati UP-Bhuria Bazar UNR to Pathan Bari Mosque via Abdul Malek Mredha Bari by HBB form ch. 00-550m (ID No. 578955341) BDRIDP patuakhali-s 0.55 11.06 M/S. Hima Bricks 10.12 100 FBP
99 BDRIDP/PAT/SAD/CCA-Rd/06 Improvement of road from Islampur Madrasha to BWDB Embankment via Rafiqul Islam Moulana Bari by HBB form ch. 00-600m (ID No. 578955342) BDRIDP patuakhali-s 0.60 14.75 M/S. Hima Bricks 12.69 100 FBP
100 BDRIDP/ PAT/SAD/ UN-Rd/01 Imp. Of road from Badarpur UP-Lowkati UP via Skandar Rari Bari road by HBB from ch.4955-5990m with 1No U-Drain at ch.5779m BDRIDP patuakhali-s 1.04 32.00 M/S. Hima Bricks 27.62 100 FBP
101 BDRIDP/ PAT/SAD/ UZR-Rd/01 Imp. Of road Patuakhali-Brisal R&H to Dumki Upazila via Moukaran GC (Sadar part) road by BC from ch.3255-5035m BDRIDP patuakhali-s 1.78 126.67 M/S. Nazmul Shahdat Traders 110.77 100 FBP
102 BDRIDP/ PAT/SDR/ UN-Rd/02 Improvement of road from Auliapur UP-Badura GC via Dhakkin Badura GPS (Dhakkin Badura GPS cum Cyclone Center) road (ID No. 578953035) by BC from Ch. 3500m-4500m under Patuakhali Sadar, Patuakhali. BDRIDP patuakhali-s 1.00 114.23 M/S. Lutfa Construction 93.02 100 FBP
103 BDRIDP/ PAT/SAD/ UZ-Rd/02 Improvement of road from Khaser hat GC to Bottolbunia GC via Hazikhali Bazar road by Earth work (Ch. 3805-4805m) BDRIDP patuakhali-s 1.00 66.53 M/S. Mohiuddin Ahmed 58.80 100 FBP
104 BDRIDP/PAT/SAD/UZ-Rd/03 Improvement of road from Patuakhali Barisal R&H (Moukaran Bridge)-Dumki UZHQ via Moukaran GC Road (Sadar Part) from Ch. 5035m-6965m (Road ID No. 578952007) BDRIDP patuakhali-s 1.93 131.69 M/S. Shakil Enterprise 104.92 65  
105 BDRIDP/PAT/SDR/UZ-Rd/04 Improvement of Road from Patuakhali-Betagi R&H Pairakunja Bazar Kakrabunia GC via Officer hat Sadar Part from Ch. 3200m-5200m including 3 Nos 1.50mx1.50m RCC Box Culvert at Ch. 3615m 3700m & 4840m ID No. 578952011 BDRIDP patuakhali-s 2.00 155.83 M/S. Nazmus Shahdat Traders 154.36 100 FBP
106 BDRIDP/PAT/SDR/CCA-Rd/08 Improvement of road From Khejurtala Bazar-Dhankhali Bazar via Dakurbunia GPS at Ch. 0.00-1000.00m including 2Nos. 1.50mX1.50m RCC Box Culvert at Ch. 220.00m & 415.00m (ID No. 578954096) BDRIDP patuakhali-s 1.00 68.65 Md. Gius Uddin 61.79 100  
107 BDRIDP/PAT/SDR/CCA-Rd/09 Improvement of road From Sreerapur Bazar-Munshir hat via Parkartikpasha GPS at ch. 765.00m-2300.00m including 1No. 1.50mX1.50m RCC Box Culvert at Ch. 1250.00m (ID No. 578954052) BDRIDP patuakhali-s 1.54 96.81 Md. Firoz 91.01 35  
108 BDRIDP/PAT/SDR/CCA-Rd/10 Improvement of road From (UZR) Fadea Bazar-(UNR) Gadur Bazar ch. 0.00-1300.00m including 1No. 1.50mX1.50m RCC Box Culvert at Ch. 1000.00m (ID No. 578954156) BDRIDP patuakhali-s 1.30 85.19 M/S. Soma Enterprise 77.47 50  
109 BDRIDP/PAT/SAD/UZ-Rd/05 Improvement of BC road From Khasher Hat GC - Bottlebunia GC via Hazikhali Hat at Ch. 2450m-3805m including 01 No. 1.00mx1.00m RCC Box Culvert at ch. 3053m. (ID No. 578952006) BDRIDP patuakhali-s 1.36 109.33 Abdul Kader Khan 103.77 70  
110 BDRIDP/PAT/SAD/CCA-Rd/11 Improvement of BC road From UZR (Hazikhali Mohammadia Madrasha) to UNR (Atahar Pada bari) - Iron Bridge road at Ch. 00m-1830m including 02 Nos. 1.50mx1.50m RCC Box Culvert at ch. 510m & 1380m. (ID No. 578954168) BDRIDP patuakhali-s 1.83 116.16 Md. Bashir Uddin 116.06 100  
111 BDRIDP/PAT/SAD/UZ-Rd/06 Improvement of Patuakhali UZHQ-Muradia GC via Sreerampur Bazar (Sadar Part) at Ch. 6785m-8785m. Including 04 Nos 1.50mX1.50m, 01 No. 3.00mX3.00m (2-vent) RCC Box Culvert at Ch. 6945m, 7565m 7835m, 8495m & 7357m BDRIDP patuakhali-s 2.00 159.35 Md. Manebur Rahman 154.45 40  
112 BDRIDP/ PAT/SAD/ UZR-ST/01 Const.of 1No 4.00mx4.00m RCC Box Culvert on Patuakhali-Barisal R&H to Dumki Upazila via Moukaran GC (Sadar part) road at ch.4715m. BDRIDP patuakhali-s 22.31 M/S. Gazi Enterprise 17.52 100 FBP
113 BDRIDP/ PAT/SAD/ CCA-ST/01 Const. of 3.00mx3.00m RCC Box culvert on Moukarn UNR road start Purbo Talikhali Mazibar dokan-North side Kafulabunia khal-daritaluk P/S & H/S road via Abdul Latif Howlader bari road at ch.1140m BDRIDP patuakhali-s 10.62 M/S. Masud & Brothers 7.78 100 FBP
114 BDRIDP/ PAT/SDR/ CCA-St/02 Const. of 1 No. 3.00mX1.00m Box culvert on Pangasha UP-Gazipur R&H (Bus Stand)-Jamla road upto Sreerampur Sluice Gate road at ch.4380m. BDRIDP patuakhali-s 9.79 M/S. Gazi Enterprise 7.29 100 FBP
115 BDRIDP/ PAT/SAD/ CCA-St/03 Const. of 1 No 3.00mx3.00m Box Culvert & 03 Nos U-Drain on Low Kathi Officer hat to Kaler hat via Kismat Moukaran Primary School road at ch.2630m, 1792m,2309m & 2976m. BDRIDP patuakhali-s 12.69 M/S. Gazi Enterprise 9.83 100 FBP
116 BDRIDP/ PAT/SDR/ UN-St/01 Construction of 02 Nos. 3.00mx3.00m RCC Box Culvert on Auliapur UP-Badura GC via Dhakkin Badura GPS (Dhakkin Badura GPS cum Cyclone Center) road at Ch. 3600m & 4150m (ID No. 578953035) under Patuakhali Sadar, Patuakhali. BDRIDP patuakhali-s 28.39 M/S. Soma Enterprise 19.42 100  
117 BDRIDP/PAT/SAD/UZ-St/02 Construction of 2Nos 1.00mX1.00m RCC Box Culvert on Khaser Hat GC via Hazikhali Bazar road at Ch. 4285m & 4450m (ID No. 578952006) BDRIDP patuakhali-s 0.00 M/S. Talukder Enterprise 4.37 100 FBP
118 BDRIDP/PAT/SAD/UZ/St-03 Construction of 2 Nos. 3.00mx3.00m, 2 Nos. 2.00mx2.00m & 2 Nos. 1.50mx1.50m RCC Box Culvert on Patuakhali Barisal R&H (Moukaran Bridge)-Dumki UZHQ via Moukaran GC Road (Sadar Part) at Ch. 5865m, 6135m, 6592m, 6435m, 5185m & 5499m. (Road ID No. 578952007) BDRIDP patuakhali-s 52.98 Md. Gius Uddin 35.96 100  
119 BDRIDP/PAT/SAD/CCA-St/04 Construction of 2-Vent 3.00mx3.00m RCC Box Culvert on Auliapur UP-Badura GC via Dakkhin Badura GPS at Ch. 6500m (Auliapur UP-H/O Bonda Ali Miah South Badura Bazar) BDRIDP patuakhali-s 19.38 Md. Mahafuz Khan 17.44 60  
120 BDRIDP/PAT/SAD/UZ-St/04 Construction of 42.06m RCC Girder Bridge on Patuakhali Barisal RHD (Moukaron Bridge)-Dumki UZHQ via Moukaran GC (Sadar Part) at Ch. 3282m (Road ID: 578952007) BDRIDP patuakhali-s 268.58 M/S. Amir Engineering Corporation-M.M. Builders & Engineers Ltd.-M/S. Niaz Traders-JV 241.72 45  
121 BDRIDP/ PAT/RANG/ UN-Rd(R)/01 Rehabilitation of road from Chottobaisdia UP-Rangabali UP (Upto Samudafath) road from Ch. 00-1595m (ID No. 578583016) under Rangabali, Patuakhali. BDRIDP Rangabali 1.60 100.75 M/S. Palli Strores 93.09 100 FBP
122 BDRIDP/PAT/RAG/GHT/01 Construction of RCC Ghat at Khalgor Bazar (Kachibunia Bazar) BDRIDP Rangabali 30.53 M/S. Deip Enterprise 30.52 0  
123 CIB-Pat-W-87 Const. of 426 m long PSC Girder Bridge with viadact at Ch.90m over Sutabaria river on Alipur UPC to Cotkhali Bazar via Kalamiar Hat (Dasmina part) road under Dasmina Upazila, District: Patuakhali . CIBRR dashmina [Road ID: 578523006] 0.09 426.00 69 4329.62 Nabarun Traders Ltd. & M/S Abul Kalam Azad (JV), House # 18/7, Bashir Uddin Road, Kalabagan, Dhaka. 5090.82 30/07/2020 06/08/2020 30/06/2025 77 3752.89 69 05/02/2025 Work is on going
124 CIB-Pat-W-24 Const. of 90m long PSC Girder Bridge over Pagla river on Patuakhali Barishal RHD (Pagla)-Pangashia UP via Hazirhat-Doparhat road at Ch.9306m under Dumki Upazila, Dist. Patuakhali CIBRR dumki [Road ID: 578963014]. 90.00 91 870.29 QC-KKE JV Mahtab Center(12th floor),BijoyNagar, Dhaka-1000 849.04 31/05/2017 07/06/2017 28/04/2021 100 779.09 91 05/02/2025 Final Bill not Paid
125 CIB-Pat-W-84 Const. of 41 m long RCC Girder Bridge over Tagasia Khal at Ch.50m on Tegachia-Jamainagar Bazar road at Matagonj Up under Kalapara Upazila, District: Patuakhali CIBRR kalapara [Road ID: 578665298]. 41.00 100 324.98 PTSL MAITREE (PVT) LTD - M/S. AMIR ENGINEERING CORPORATION - RAB-RC (PVT.) LTD. JV, College Row, Barisal, Bangladesh 255.21 24/12/2017 31/12/2017 30/12/2018 100 272.87 100 05/02/2025 Final bill paid
126 CIB-Pat-W-86 Const. of 96 m long PSC Girder Bridge at Ch.1500m over Srimonto river on Kathaltali GC- Patuakhali-Betagi RHD (Thana Bridge) road and Kathaltoli roadunder Mirzaganj Upazila, District: Patuakhali CIBRR mirjaganj 578762004 96.00 95 1124.30 "M/S Abul Kalam Azad, Azad Bhaban, Muslimpara, Patuakhali Sadar, Patuakhali." 1360.63 10/10/2019 17/10/2019 30/05/2023 100 1305.06 95 05/02/2025 WORKS ON GOING
127 e-GP/CTCRP/PATU/RD-01 Construction/Improvement of 03 Nos Road under Patuakhali Pauroshava, District: Patuakhali CTCRP patuakhali-s 5.96 239590167.17 M/S Hamim International 262705918.47 21/03/2024 21/09/2025 21 02/04/2024
128 e-GP/CTCRP/PATU/RD-02 Construction/Improvement of 07 nos Road under Patuakhali Paurashava, District:Patuakhali CTCRP patuakhali-s 5.84 210508494.20 Md.Rashaduzzaman Peter 230607508.10 31/07/2025 25 25/03/2024
129 e-GP/CTCRP/PATU/DR-01 Construction/Improvement of 15 nos Drains under Patuakhali Pourashava, District:Patuakhali CTCRP patuakhali-s 4.13 149801546.64 M/S Kohinoor Enterprise 149794319.20 06/05/2025 70 25/03/2024
130 e-GP/CTCRP/PATU/DR-02 Construction/Improvement of 14 nos Drain under Patuakhali Pourashava, District: Patuakhali CTCRP patuakhali-s 4.33 155458352.00 M/S Hamim International 163104654.39 06/05/2025 40 25/03/2024
131 DIRIP-2/VR/BC-23/Patuakhali/2017-18 (200107) Improvement of Chiker gudhi-SikderBari Near Bara Gopaldi UZR Road by BC (Ch. 0-1500m), (ID: 578524023), (Dashmina) DIRIP-2 dashmina 1.50 44.50 M/S Palli StorsTown Kalikapur Patuakhali 42.27 100 31/12/2021
132 DIRIP-II/UZR/Str-01/Patuakhali /2018-19 (238567) Construction of 13m Long RCC Bridge on Barogopaldi GC-Ayaser hat RHD Road at Ch. 7300m under Dashmina Upazila, District: Patuakhali, (Road ID: 578522009) DIRIP-2 dashmina 578522009 13.00 127.22 Rezwanul Maksud, Eidgah Sarak, Patuakhali. 120.86 21/01/2019 28/01/2020 28/01/2020 100 31/12/2021
133 DIRIP-2/VR/BC-28/Patuakhali/2018-19 Improvement of Char Borhan Madrasha-Char Shahjalal Kheya Ghat Road by BC Ch. 00-2000m DIRIP-2 dashmina 578525171 2.00 250.00 M/S. Rupali Construction & Sarika Traders (JV), Char Montaz, Rangabali, Patuakhali. 213.00 23/07/2019 31/07/2020 31/07/2020 100 182.61 31/12/2021
134 DIRIP-II/UZR/Str-01/Patuakhali /2018-19 Construction of 13m Long RCC Bridge on Barogopaldi GC-Ayaser hat RHD Road at Ch. 7300m DIRIP-2 dashmina 578522009 13.00 127.22 Rezwanul Maksud, Eidgah Sarak, Patuakhali. 120.86 21/01/2019 28/01/2020 28/01/2020 100 94.60 31/12/2021
135 DIRIP-2/UNRStr-14/Patuakhali/18-19 Construction of 28m PSC bridge on Dashmina UPC-Mashukhali Hat Road at Ch. 470m DIRIP-2 dashmina 578523012 28.00 318.74 M/S. Abul Kalam Azae & M/S. Deip Enterprise (JV), Town Kalikapur, Patuakhali. 281.60 03/06/2019 09/06/2020 09/06/2020 75 90.00 31/12/2021
136 DIRIP-2/UNR(Str)-19/Patuakhali/2018-19 Construction of 66m long RCC Bridge at Ch. 7000m on Bohrampur UPC - Thakurer Hat Road DIRIP-2 dashmina 578523010 66.00 694.44 M/S. Eli Enterprise and Md. Enayet Hossain (JV), Natun Bazar, Patuakhali. 723.26 03/06/2019 09/06/2020 09/06/2020 100 529.40 31/12/2021
137 DIRIP-2/UNR/BC-04/Patuakhali/2017-18(176405) Improvement of Dashmina UPC-Masuakhali hat from Ch. 2000.00-3232.00m (Id No: 578523011) [Salvage Cost: 31,990] [Dashmina] DIRIP-2 dashmina 578523011 1.02 101.10 M/S Sikder EnterpriseMominpur, Bauphal, Patuakhali 96.04 04/06/2018 04/06/2018 03/06/2019 100 14/07/2020
138 DIRIP-2/UNR/BC-05/Patuakhali/2017-18(176411) Improvement of road of Alipur UPC Modhupura hat from Ch. 2000-4300.00m (Id No: 578523015) [Dashmina] DIRIP-2 dashmina 578523015 2.30 230.57 M/S Najmus Shahadat tradersBadarpur, Patuakhali 217.95 29/05/2018 29/05/2018 05/06/2019 100 14/07/2020
139 DIRIP-II/UNR/Str-08/Patuakhali/2018-19 Construction of 22m Long RCC Bridge on Basbaria UPC-Primary School Hat Road at Ch. 470m DIRIP-2 dashmina 578523014 22.00 169.40 Md. Mahabubur Rahman, Bogura, Bahrampur, Dashmina, Patuakhali. 161.00 21/01/2019 28/01/2020 28/01/2020 100 156.01 14/07/2020
140 DIRIP-II/UNR/Str-09/Patuakhali /2018-19 Construction of 24m Long RCC Bridge on Alipur UPC-Madupura Hat Road at Ch. 1525m DIRIP-2 dashmina : 578523015 24.00 184.00 Md. Kamal Hossain, Nalkhola Bandar, Dashmina, Patuakhali. 174.73 21/01/2019 28/01/2020 28/01/2020 100 169.00 14/07/2020
141 DIRIP-2/UNR(Str)-03/Patuakhali/2018-19 Construction of 22m Long RCC Bridge on Rangopaldi Bridge UNR-Rabibaria Hat RHD Road at Ch. 413m under Dashmina Upazila, District: Patuakhali, DIRIP-2 dashmina 578524122 22.00 147.86 M/S. Sunrise Construction, Charpara, Patuakhali. 140.05 21/01/2019 28/01/2019 28/01/2019 88 118.44 12/07/2020
142 DIRIP-2/Patua/Dash/M-02/2018-19 (238573) Maintenance of Galachipa UZHQ- Kalagachi GC Road.(Ch.3560-7000m) (ID No.578523010) (Galachipa) DIRIP-2 dashmina 578523010 2.80 133.46 M/S. Mamun Construction, Thanapara, Patuakhali. 126.79 21/01/2019 28/01/2020 28/01/2020 100 34.61 12/07/2020
143 DIRIP-2/UNR(Str)-04/Patuakhali/2018-19 Construction of 22.00m Long RCC Bridge on Rangopaldi Bridge UNR-Rabibaria Hat RHD Road (Ch. 1260m) (ID No. 578524122) (Dashmina) DIRIP-2 dashmina 578524122 22.00 148.78 M/S. Eva Construction, Baitul Aman Lane, Patuakhali. 141.34 04/01/2019 21/01/2020 21/01/2020 90 120.00 28/06/2020
144 DIRIP-2/Patua/Dash/M-03/2018-19 (238573) Maintenance of Baharampur UPC-Thakurer hat.Road (Ch. 2800-5657m) (ID No. 578523010) (Dashmina). DIRIP-2 dashmina 578523010 2.80 211.36 Golam Mostofa, Arambag, Patuakhali. 200.79 21/01/2019 31/01/2020 31/01/2020 100 20.05 28/06/2020
145 DIRIP-2/VRStr-01/Patuakhali/2017-18 (176406) Construction of 2.00x2.00m Box-Culvert on Ch. 3025.00m on Lebukhali Golachipa RHD near joutha bazar-Alipur GC Ulania GC road via ashimollar hat (Id No: 578524035) [Dashmina] DIRIP-2 dashmina 2.00 7.61 Md. Khabir Sikder Govt. Girls School Road, Patuakhali 7.23 04/12/2018 100  
146 DIRIP-2/UNRStr-01/Patuakhali/2017-18 (176407) Construction of 2.00x2.00 Box-Culvert on Ch. 1700.00m on Bashbaria UPC-Primary school hat road (Id No: 578523014) [Dashmina] DIRIP-2 dashmina 2.00 7.59 Md. Jasim Uddin Subidkhali, Mirjaganj, Patuakhali 7.21 15/11/2018 100  
147 DIRIP-2/VRStr-02/Patuakhali/2017-18 (176408) Construction of RCC Box-Culvert on 1490.00, 2650.00 & 4570.00m on Betagi sikder bari-Changoria purbo side moishadi via rambollov madrasha road (Id No: 578524024) [Dashmina] DIRIP-2 dashmina 5.00 17.25 Happy Construction Saubjbag, Patuakhali 16.39 04/12/2018 100  
148 DIRIP-2/VR/BC-15/Patuakhali/2017-18 (176409) Improvement of Chandpur hat-Modhupur cyclone shelter road (Kalamia bazar-Alaminer bari) from Ch. 00-1280.00m (Id No: 578524024) [Dashmina] DIRIP-2 dashmina 1.28 112.62 M/S Sikder Enterprise Mominpur, Bauphal, Patuakhali 106.99 100  
149 DIRIP-2/VR/BC-16/Patuakhali/2017-18 (176410) Improvement of road from Ronogopaldi bridge UNR-Robibaria hat RHD from Ch. 2010-2835.00m (Id No: 578524122) [Dashmina] DIRIP-2 dashmina 0.83 61.47 M/S Md. Delwar Hossain Lebukhali, Patuakhali 58.39 04/06/2019 100  
150 DIRIP-2/UNRStr-02/Patuakhali/2017-18 (192575) Construction of 4.00mX4.00m Box Culvert on Baharampur UPC-Thakurerhat Road at Ch. 4500m (ID: 578523010), (Dashmina) DIRIP-2 dashmina 4.00 24.28 M/S. Mim Enterprise Khalishakhali, Patuakhali 23.07 05/12/2019 100  
151 DIRIP-2/VR/BC-11/Patuakhali/2017-18(176400) Improvement of Sontoshdi launch ghat-Tulatola road (Muradia UP-Sontoshdi launch ghat A.K high school via Amir hossen launch ghat road) from ch.00-1000m (Id No: 578964003) [Dumki] DIRIP-2 dumki 1.00 77.09 Md. GiusuddinArambag, Patuakhali 73.24 13/05/2018 19/05/2019 100 31/12/2021
152 DIRIP-2/VR/BC-12/Patuakhali/2017-18 (176402) Improvement of Lebukhali-Boga RHD (Chor gorobdi ferry ghat)-Amir hossen howlader bazar via A Kashem high school (Muradia UP-Sontoshdi Launch ghat AK high school via Amir hossen launch ghat road) from Ch. 2000.00-4538.00m and Box-culvert on 2050.00,2221.0 DIRIP-2 dumki 2.05 180.41 Md. Enayet Hossain Natunbazar, Patuakhali 171.39 13/05/2018 19/05/2019 100  
153 DIRIP-2/VR/BC-19/Patuakhali/2017-18(192069) Improvement of Kalam Gradge RHD-Paul Bari UZR Road by BC (Ch. 0-5340m), (ID: 578574150), (Galachipa) DIRIP-2 galachipa 5.31 415.34 M/S Palli StorsTown Kalikapur Patuakhali 404.93 14/08/2018 20/08/2019 100 31/12/2021
154 DIRIP-2/VR/BC-20/Patuakhali/2017-18(192070) Improvement of Char Kazol UZR-Chota Kazol Ghat Road by BC (Ch. 00-4600m), (ID No: 578574122), (Galachipa) DIRIP-2 galachipa 4.59 332.46 Md. FirozFire Service RoadPatuakhali 317.81 14/08/2018 20/08/2019 100 31/12/2021
155 DIRIP-2/VR/BC-17/Patuakhali/2017-18(192071) Improvement of N.Sonkhola G.P/School-Lamna Sr Madrasha Road by BC (Ch. 00-3800m), (ID: 578574009), (Galachipa) DIRIP-2 galachipa 3.76 270.19 M/S Abdullah Enterprise Holding No-287, Morium Bhaban, Moshjid Lane, Simul Bag, Patuakhali 256.68 29/07/2018 04/08/2019 100 31/12/2021  
156 DIRIP-2/VR/BC-18/Patuakhali/2017-18(192072) Improvement of Sailabunia Primary school to Mudirhat Road by BC (Ch. 00-1250m), (ID: 578574170), (Galachipa) DIRIP-2 galachipa 1.24 98.00 M/S Palli StorsTown Kalikapur Patuakhali 93.10 29/07/2018 04/08/2019 100 31/12/2021
157 DIRIP-2/VR/BC-21/Patuakhali/2017-18(192074) Improvement of Golkhali Kheaghat-Kalirchar G.p.school Road by BC (Ch. 0-2950m), (ID: 578575095), (Galachipa) DIRIP-2 galachipa 2.95 220.31 M/S SOMA ENTERPRISEOLD BASS TERMINAL ROAD PATUAKHALI 209.29 29/07/2018 04/08/2019 80 31/12/2021
158 DIRIP-2/VR/BC-24/Patuakhali/2018-19 (293037) Improvement of Gilabaria Bazar-Banshbaria School via Abid Kha Road by BC from Ch. 00m-3100m ID No. 578574086 Galachipa DIRIP-2 galachipa 578574086 3.10 190.04 Shimanto Trading Angency 180.54 23/07/2019 30/09/2020 30/09/2020 100 31/12/2021
159 DIRIP-2/VR/BC-25/Patuakhali/2018-19 (293038) Improvement of Gilabaria Bazar-Banshbaria School via Abid Kha Road by BC from Ch. 3100m-6200m ID No. 578574086 Galachipa DIRIP-2 galachipa 578574086 3.10 272.89 Kohinur Enterprise & Mizanur Alam ( JV) 268.21 30/09/2019 06/10/2020 06/10/2020 65 31/12/2021
160 DIRIP-2/VR/BC-26/Patuakhali/2018-19 (293039) Improvement of Majhgram UZR Mallik Bari Bandh-Dabiruddin Bari Road Chiknikandi UP-Katkhali Lanch Ghat by BC from Ch. 00m-2800m ID No. 257857429 Galachipa DIRIP-2 galachipa 257857429 2.80 221.99 " Md. Enayet Hossain, Natun Bazar, Patuakhali. " 203.55 15/09/2019 21/09/2020 21/09/2020 100 31/12/2021
161 DIRIP-2/VR/BC-27/Patuakhali/2018-19 (293040) Improvement of Amkhola RHD-Tafalbaria UNR Amkhola UP Office-Mushorighati Sluice Road by BC from Ch. 2000m-5500m ID No. 578574102 Galachipa Salvage Cost BDT 814635.00 DIRIP-2 galachipa 578574102 2.50 298.15 Akteruzaman-Samim Ahasaun 275.14 09/09/2019 08/09/2020 08/09/2020 100 31/12/2021
162 DIRIP-2/UNRStr-15/Patuakhali/18-19 (287507) Construction of 30m PSC bridge on Gozalia UP-Thakur Bazar Gozalia UP-Dakua UP via Gozalia Bazar Road at Ch. 10m under Galachipa Upazila Dist Patuakhali ID No. 578573026 DIRIP-2 galachipa 578573026 30.00 227.52 QC-KKE (JV) 209.95 03/06/2019 09/06/2020 09/06/2020 85 31/12/2021
163 DIRIP-2/UNRStr-16/Patuakhali/2018-19 (269587) Construction of 54m long RCC Bridge at Ch. 1968m on Golkhali UPC - Naluabagi Bazar Naluabagi - Bazar RHD via UP office Road under Galachipa Upazila District Patuakhali Road ID- 578573022 DIRIP-2 galachipa 578573022 54.00 427.73 QC-KKE (JV) 390.00 03/06/2009 09/06/2020 09/06/2020 88 31/12/2021
164 DIRIP-2/UNRStr-17/Patuakhali/2018-19 (269588) Construction of 48m long RCC Bridge at Ch. 4362m on Chinikandi UPC Amkhola UPC Road under Galachipa Upazila District Patuakhali Road ID- 578573008 DIRIP-2 galachipa 578573008 48.00 465.40 M/S Palli Stors 440.78 03/06/2019 09/06/2020 09/06/2020 85 31/12/2021
165 DIRIP-2/UNR/Str-18/Patuakhali/2018-19 (269578) Construction of 40m long PSC Bridge at Ch. 1242m on Golkhali UPC - Naluabagi Bazar Naluabagi - Bazar RHD via UP office Road under Galachipa Upazila District Patuakhali Road ID- 578573022 DIRIP-2 galachipa 578573022 40.00 506.67 Kohinoor Enteprise & Mizanur Alam (JV), Mridha Bari Sarak, Town Kalikapur, Patuakhali. 519.92 04/08/2019 10/08/2020 10/08/2020 88 31/12/2021
166 DIRIP-2/UNR(Str)-20/Patuakhali/2018-19 (269801) Construction of 84m long RCC Bridge at Ch. 2303m on Amkhola UPC (Bhangra RHD)- Friday Hat Road under Galachipa Upazila District Patuakhali Road ID- 578573002 DIRIP-2 galachipa 578573002 48.00 706.30 QC-KKE(JV) 669.52 03/06/2019 09/06/2020 09/06/2020 45 31/12/2021
167 DIRIP-2/VRStr-08/Patuakhali/ 2018-19 (269585) Construction of 57m long RCC Bridge at Ch. 2208m on Tetultola Bazar UZR - Ulania GC Road under Galachipa Upazila District Patuakhali Road ID- 578574206 DIRIP-2 galachipa 578574206 57.00 309.40 M/S Abul Kalam Azad & M/S. Deip Enterprise (JV) 283.16 03/06/2019 09/06/2020 09/06/2020 90 31/12/2021
168 DIRIP-II/UNR/Str-10/Patuakhali /2018-19 (238571) Construction of 24m Long RCC Bridge on Panpatty UPC- Panpatty Bazar (Galachipa Kalikapur-Panpotty Launch Ghat) Road at Ch. 2600m under Galachipa Upazila, District: Patuakhali, (Road ID: 578573011) DIRIP-2 galachipa 578573011 24.00 161.35 M/S. Khairul Enterprise, Muslimpara, Patuakhali. 153.28 21/01/2019 28/01/2020 28/01/2020 100 31/12/2021
169 DIRIP-2/VR/BC-24/Patuakhali/2018-19 Improvement of Gilabaria Bazar-Banshbaria School via Abid Kha Road by BC from Ch. 00m-3100m DIRIP-2 galachipa 578574086 3.10 190.00 Shimanto Trading Agency, LGED, Patuakhali. 180.54 23/07/2019 30/09/2020 30/09/2020 100 62.53 31/12/2021
170 DIRIP-2/VR/BC-13/Patuakhali/2017-18(176403) Improvement of Gozalia UPC-Gozalia launch ghat road (Bahar gozalia madrasha-WAPDA-Adani bazar Gozalia bridge bazar from Ch. 00-3130.00m (Id No: 578575027) [Galachipa] DIRIP-2 galachipa 3.12 1.00 231.84 M/S Najmus Shahadat tradersBadarpur, Patuakhali 225.65 22/10/2018 22/10/2018 04/06/2019 100 14/07/2020
171 DIRIP-2/VR/BC-14/Patuakhali/2017-18(176404) Improvement of Kharizzama bazar UZR-Patabunia GC (Icchadi kheyaghat amkhola UP Kolagachia GC) from Ch. 00-2500.00m (Id No: 578574201) [Salvage Cost: 23,80,856] [Galachipa] DIRIP-2 galachipa 2.50 174.71 M/S Sikder EnterpriseMominpur, Bauphal, Patuakhali 16.60 28/05/2018 03/06/2019 100 14/07/2020
172 DIRIP-2/UNR/BC-07/Patuakhali/2017-18(192574) Improvement of Charkazol UPC - Jahazmara Sluice Road by BC (Ch. 7000m-12300m), (ID: 578573029), (Galachipa) DIRIP-2 galachipa 5.23 398.71 M/S Palli StorsTown Kalikapur Patuakhali 388.48 14/08/2018 20/08/2019 68 14/07/2020  
173 DIRIP-2/VR/BC-22/Patuakhali/2017-18(192576) Improvement of Golkhali Upc-Julakha Bazar RHD Road (Galachipa Head Quarter-Golkhali-Gazipur GC) by BC (Ch. 0-2450m), (ID: 578574216), (Galachipa), (Salvage BDT: 266,858) DIRIP-2 galachipa 2.39 172.48 M/S Sikder Enterprise, Muradia, Dumki, Patuakhali 163.86 29/07/2018 04/08/2019 65 14/07/2020  
174 DIRIP-2/UNR/BC-08/Patuakhali/2017-18(211187) Improvement of Chiknikandi UPC-Amkhola UPC road (Ch.5800m-6800m) By BC (ID.No. 578573008) (Galachipa) DIRIP-2 galachipa 0.60 44.50 M/S. Md. Delowar HossainDumkiPatuakhali 42.27 22/10/2018 28/04/2019 28/04/2019 100 14/07/2020  
175 DIRIP-II/UNR/Str-11/Patuakhali /2018-19 Construction of 18m Long RCC Bridge on Panpatty UPC- Panpatty Bazar (Galachipa Kalikapur-Panpotty Launch Ghat) Road at Ch. 1500m under Galachipa Upazila, District: Patuakhali, (Road ID: 578573011) DIRIP-2 galachipa 578573011 18.00 135.12 Shafiqur Rahman 128.36 10/06/2019 16/06/2020 16/06/2020 100 14/07/2020
176 DIRIP-II/UZR/Str-02/Patuakhali /2018-19 Construction of 22m Long RCC Bridge on Matibanga(RHD) -Char Biswas GC Road at Ch. 10420m DIRIP-2 galachipa 578572002 22.00 165.30 M/S. Sonali Traders, S.D.O Road, Patuakhali. 157.30 21/01/2019 14/11/2019 14/11/2019 100 151.00 14/07/2020
177 DIRIP-2/UNR(Str)-20/Patuakhali/2018-19 Construction of 84m long RCC Bridge at Ch. 2303m on Amkhola UPC (Bhangra RHD)- Friday Hat Road under Galachipa Upazila District Patuakhali DIRIP-2 galachipa 578573002 84.00 669.50 QC-KKE (JV), 177-Bijoy Nagar, Mahtab Center (12th Floor), Dhaka-1000. 669.52 07/07/2020 20/07/2020 07/07/2020 40 123.08 14/07/2020
178 DIRIP-2/Patua/Dash/M-01/2018-19 (238573) Maintenance ofUlania GC-Patabunia GC via Chiknikandi UP Road (Ch.3500-5250m) (ID No. 578572006) (Galachipa) DIRIP-2 galachipa 578572006 1.75 47.85 45.46 17/01/2019 24/07/2019 24/07/2019 100 47.85 13/07/2020
179 DIRIP-2/Patua/Gala/M-10/2018-19 (238582) Maintenance of Galachipa UZHQ- Kalagachi GC Road.(Ch.17279-20000m) (ID No. 578572001) (Galachipa) DIRIP-2 galachipa 578572001 2.72 125.08 M/S. Deip Enterprise, Town Kalikapur, Patuakhali. 136.34 21/01/2019 28/01/2020 28/01/2020 50 0.00 13/07/2020
180 DIRIP-2/UNR(Str)-12/Patuakhali/2018-19 Maintenance of Gilabaria Bazar-Kallan Kalos Bazer. Road (Ch.3635-5660m) (ID No. 578574203) (GalaMaintenence of Amkhola UPC (Vhangra RHD) - Friday Hat Road (Ch. 00-2450m) (ID No: 578573002) (Galachipa) chipa) DIRIP-2 galachipa 5578573002 2.45 22.00 112.26 M/S. Moniruzzaman Titu, Bazarghona, Marichbunia, South Sabujbag, Patuakhali. 106.65 21/01/2019 28/01/2020 28/01/2020 45 52.57 13/07/2020
181 DIRIP-2/Patua/Dash/M-14/2018-19 (238573) Maintenence of Chandrail H/S - Chander Hat Road. (Ch. 1495-3150m) (ID No: 578574020) (Galachipa) DIRIP-2 galachipa 578574020 1.65 85.40 M/S. Monira Enterprise, Kalaiya, Bauphal, Patuakhali. 81.13 21/01/2019 28/01/2020 28/01/2020 100 78.40 13/07/2020
182 DIRIP-2/Patua/Dash/M-15/2018-19 (238573) Maintenance of Panpatty UPC- Panpatty Bazar Launch Ghat Ch 00-3112 m ID No. 578573011 under Galachipa Upazila District Patuakhali DIRIP-2 galachipa 578573011 3.11 75.08 " M/S. Mamun Construction, Thanapara, Patuakhali. " 71.32 15/01/2020 21/04/2020 21/04/2020 25 50.93 13/07/2020
183 DIRIP-2/Patua/Dash/M-16/2018-19 (238573) Maintenance of Charbiswas UPC- Nomo Sluice Bazar via Battala BazarCh 3000-7000 m ID No. 578573018 under Galachipa Upazila District Patuakhali DIRIP-2 galachipa 578573018 4.00 287.74 M/S. K.K. Enterprise-M/S. Anowara & Sons- JVCA, Authorized Signatory: Md. Rimanul Islam, Word # 4, Arambag, Patuakhali. 246.13 02/04/2020 29/08/2020 29/08/2020 35 68.12 13/07/2020
184 DIRIP-2/Patua/Dash/M-17/2018-19 (238573) Maintenance of Gazalia UPC - Amkhola UPC Ch 00-1020 m ID No. 578573027 under Galachipa Upazila District Patuakhali DIRIP-2 galachipa 578573027 1.03 56.84 Shimanto Trading Agency, Latif School Road, Patuakhali. 54.00 27/01/2020 03/05/2020 03/05/2020 0 0.00 13/07/2020
185 DIRIP-2/Patua/Dash/M-18/2018-19 (238573) Maintenance of Tatultala Bazar UZR-Ulania GC Ch 00-4610 m ID No. 578574206 under Galachipa Upazila District Patuakhali DIRIP-2 galachipa 578574206 4.61 76.41 " Md. Shafiqul Islam, Natun Bazar, Word No-01, Galachipa, Patuakhali. " 72.59 16/02/2020 22/05/2020 22/05/2020 0 0.00 13/07/2020
186 DIRIP-2/Patua/Dash/M-19/2018-19 (238573) Maintenance of Gabua Bridge RHD- Friday HatCh 00-6000 m ID No. 578574208 under Galachipa Upazila District Patuakhali DIRIP-2 galachipa 578574208 6.00 129.89 M/S. Nishat Bilders, Marichbunia,Post-Marichbunia -8600, Patuakhali-Sadar,Patuakhali. 123.39 28/01/2020 26/05/2020 26/05/2020 0 0.00 13/07/2020
187 DIRIP-2/Patua/Dash/M-04/2018-19 (238573) Maintenance of Galachipa UZHQ- Kalagachi GC Road.(Ch.00-3560m) (ID No. 578572001) (Galachipa) DIRIP-2 galachipa 578572001 3.56 195.40 Md. Mizanur Alam, Town Kalikapur, Patuakhali. 212.46 21/01/2019 28/01/2020 28/01/2020 100 201.61 12/07/2020
188 DIRIP-2/UNR(Str)-06/Patuakhali/2018-19 Maintenance of Galachipa UZHQ- Kalagachi GC Road.(Ch.3560-7000m) (ID No. 578572001) (Galachipa) DIRIP-2 galachipa 578572001 3.44 163.69 M/S. M.L Builders, Eidgah Sarak, Sabujbag, Patuakhali. 178.24 21/01/2019 28/01/2020 28/01/2020 100 169.00 12/07/2020
189 DIRIP-2/Patua/Dash/M-07/2018-19 (238573) Maintenance of Galachipa UZHQ- Kalagachi GC Road.(Ch.7000-10500m) (ID No. 578572001) (Galachipa) DIRIP-2 galachipa 578572001 3.50 167.61 Akash Enterprise, Chandkati, Kalishuri, Bauphal, Patuakhali. 186.95 21/01/2019 28/01/2020 28/01/2020 100 166.70 12/07/2020
190 DIRIP-2/Patua/Dash/M-08/2018-19 (238573) Maintenance of Galachipa UZHQ- Kalagachi GC Road.(Ch.10500-13710m) (ID No. 578572001) (Galachipa) DIRIP-2 galachipa 578572001 3.21 22.00 156.90 " Happy Construction Saubjbag, Patuakhali " 170.88 21/01/2019 28/01/2020 28/01/2020 100 161.33 12/07/2020
191 DIRIP-2/Patua/Dash/M-09/2018-19 (238573) Maintenance of Galachipa UZHQ- Kalagachi GC Road.(Ch.13710-17279m) (ID No. 578572001) (Galachipa) DIRIP-2 galachipa 578572001 3.57 180.73 M/S. Bhuya Construction, Thanapara, Patuakhali Sadar, Patuakhali. 196.32 21/01/2019 28/01/2020 28/01/2020 75 161.33 12/07/2020
192 DIRIP-2/UNR/BC-06/Patuakhali/2017-18(192073) Improvement of Golkhali UPC -Naluabagi Bazar Road by BC (Ch. 3000-3500m), (ID: 578573022), (Galachipa) DIRIP-2 galachipa 0.50 435.31 M/S SOMA ENTERPRISEOLD BASS TERMINAL ROAD PATUAKHALI 41.35 29/07/2018 04/05/2019 10 12/03/2019
193 GSIDP/PTK/DW-45 Improvement of Nurainpur Jame-E-Mosque, Union: Surjamani.[Latitude:22.4698, Longitude: 90.5597 GSIDP bauphal 3.09 MD. Nurul Amin 2.93 0 07/04/2019
194 GSIDP/PTK/DW-46 Improvement of Boga Darus Sunnat Jame-E-Mosque, Union: Boga.[Latitude:22.4258, Longitude: 90.4653] GSIDP bauphal 5.69 M/S. Sithi Traders 5.41 29/01/2019 06/05/2019 70 07/04/2019
195 GSIDP/PTK/DW-47 Improvement of Kalaiya Bondor Eidgah Math , Union: Kalaiya.[Latitude:22.2340, Longitude: 90.3458 ] GSIDP bauphal 15.00 S.M Mijan 14.25 22/01/2019 28/04/2019 90 07/04/2019
196 GSIDP/PTK/DW-48 Improvement of Shinghera kati East side of Mirdha Bari Eidgah Field, Union: Kalisuri.[Latitude:22.5267, Longitude: 90.4816 ] GSIDP bauphal 5.62 M/S. Rubel Enterprise 5.34 29/01/2019 06/05/2019 0 07/04/2019
197 GSIDP/PTK/DW-49 Improvement of Kalaiya Rada Gobindo Mondir , Union: Kalaiya.[Latitude:22.2334, Longitude: 90.3527 GSIDP bauphal 3.09 M/S. Khan Traders 2.94 29/01/2019 06/05/2019 50 07/04/2019
198 GSIDP/PTK/DW-51 Improvement of Late Choundu Mia house Jame-E-Mosque, Union: Bauphal. [Latitude:22.2538, Longitude: 90.3012 ] GSIDP bauphal 3.05 MD. Nurul Amin 2.89 0 07/04/2019
199 GSIDP/PTK/DW-54 Improvement of Kalisuri Digree College Field, Union: Kalisuri.[Latitude:22.5330, Longitude: 90.5196 ] GSIDP bauphal 3.00 Sikder Traders 2.85 31/01/2019 08/05/2019 0 07/04/2019
200 GSIDP/PTK/DW-55 Improvement of Bilbilash Amir Molla Bari Jame-E-Mosque, Union: Kalaiya. [Latitude:22.2448, Longitude: 90.3111 ] GSIDP bauphal 3.02 M/S. Safiqul Enterprise 2.87 0 07/04/2019
201 GSIDP/PTK/DW-1 Improvement of Kalu Mollah hat Jam-E-Mosque, Union: Baharampur.[Latitude:22.169564, Longitude: 90.474580.] GSIDP dashmina 6.00 MD Anower Hossain 5.70 0  
202 GSIDP/PTK/DW-2 Improvement of Bashbaria Launch gate Jam-E-Mosque, Union: Bashbaria.[Latitude:22.189674, Longitude: 90.484585.] GSIDP dashmina 7.00 MD. Abu taher 6.65 0  
203 GSIDP/PTK/DW-3 Improvement of PaglaBazer Jam-E-Mosque, Union: Char Borhan. [Latitude:22.178474, Longitude: 90.569018.] GSIDP dashmina 7.00 Mrs. Rahima Traders 6.65 0  
204 GSIDP/PTK/DW-4 Improvement of Noalkhola Bazar Shasan, Union: Dashmina.[Latitude:22.345684, Longitude: 90.567180.] GSIDP dashmina 3.00 MD. Abu taher 2.85 0  
205 GSIDP/PTK/DW-5 Improvement of Alipur Hat Jam-E-Mosque, Union: Alipur.[Latitude:22.189681, Longitude: 90.484509.] GSIDP dashmina 6.00 MD Anower Hossain 5.70 0  
206 GSIDP/PTK/DW-6 Improvement of Auliapur Hat Jam-E-Mosque, Union: Rangopaldi.[Latitude:22.189674, Longitude: 90.484585.] GSIDP dashmina 6.00 MD Anower Hossain 5.70 28/06/2018 29/09/2018 100  
207 GSIDP/PTK/DW-7 Improvement of Arojbegi Jam-E-Mosque, Union: Dashmina.[Latitude:22.244957Longitude: 90.5555.] GSIDP dashmina 6.00 MD. Abu taher 5.70 0  
208 GSIDP/PTK/DW-8 Improvement of Thakurer hat Jam-E-Mosque, Union: Dashmina. [Latitude: 22.334240,Longitude: 90.515820.] GSIDP dashmina 6.00 Mrs. Rahima Traders 5.70 0  
209 GSIDP/PTK/DW-11 Improvement of Gilabaria Bazer Jame-E-Mosque, Union: Kalagachia.[Latitude:22.282, Longitude: 90.4836] GSIDP galachipa 3.00 Md. Basir Uddin 2.85 0  
210 GSIDP/PTK/DW-12 Improvement of Dhalu Fakir hat Jame-E-Mosque, Union: Bakulbaria.[Latitude:22.3393, Longitude: 90.4742] GSIDP galachipa 3.00 M/S. Gazi Construction 2.85 0  
211 GSIDP/PTK/DW-13 Improvement of Pankhali Bazer Jame-E-Mosque, Union: Chiknikandi.[Latitude:22.2327, Longitude: 90.4549] GSIDP galachipa 4.00 Saidin islam Traders, 3.85 0  
212 GSIDP/PTK/DW-14 Improvement of Nomor Sluice Bazer Jame-E-Mosque, Union: Charbiswash.[Latitude: 21.9986, Longitude: 90.5253] GSIDP galachipa 3.00 M/S. Arabe Enterprose 2.85 0  
213 GSIDP/PTK/DW-15 Improvement of Ichadi Chander Hat Jame-E-Mosque, Union: Gazalia.[Latitude:22.2483, Longitude: 90.3933] GSIDP galachipa 3.00 M/S. Gazi Construction 2.85 0  
214 GSIDP/PTK/DW-87 Improvement of Purbo Subidkhali Jame Mosque,Union: Dewli Subidkhali .[Latitude: 22.5310,Longitude:90.2650] GSIDP mirjaganj 5.00 M/S. Bepari Traders 4.75 20/03/2019 26/06/2019 0 07/04/2019
215 GSIDP/PTK/DW-89 Improvement of Pochim Sucidkhali Ased Houlader Jame Mosque,Union : Dewli Subidkhali.[Latitude; 22.5415,Longitude: 90.2745] GSIDP mirjaganj 3.00 M/S. Safiqul Enterprise 2.85 0 07/04/2019
216 GSIDP/PTK/SDW-94 Improvement of Sree Sree Radha Krisno Mondir Union : Amragachia.[ Latitude: 22.553,Longitude: 90.285] GSIDP mirjaganj 5.00 0.00 0 07/04/2019
217 GSIDP/PTK/SDW-31 Improvement of Jhatibunia Hossan Ali Houlader Bari Jame Mposque, Union: Amragachia [Latitude: 22.4122, Longitude: 90.2465.] GSIDP mirjaganj 10.00 MD. Jahirul Islam 95.00 02/12/2018 09/03/2018 75 04/04/2019
218 GSIDP/PTK/SDW-32 Improvement of Purbo Subidkhali Katun Zannat Madrasha front Jame Mposque, Union:Dewli Subidkhali [ Latitude: 22.3479, Longitude: 90.2111.] GSIDP mirjaganj 10.00 M/S. Patuakhali Hardware, 95.00 27/11/2018 26/02/2019 30 04/04/2019
219 GSIDP/PTK/SDW-33 Improvement of Hazi Asmoth Ali Jame Mposque, Union: Madafkhali [ Latitude: 22.35542, Longitude: 90.55026.] GSIDP mirjaganj 1.83 M/S. Mahmuda Enterprise 1.74 13/12/2018 20/03/2019 0 04/04/2019
220 GSIDP/PTK/SDW-63 Improvement of sharik khali Esahak Houladerbari Jame Mposque,union : Itabaria [Latitude:22.356305,Longitude:90.296827.] GSIDP patuakhali-s 8.53 Msdohaenterprise 8.10 0 07/04/2019
221 GSIDP/PTK/DW-70 Improvement of Uttar Dhaukhali Al Modina Jame -E-Mosque,Union: Uttar Lawkathi.[Latitude: 22.388257,Longitude: 90.351195] GSIDP patuakhali-s 3.24 Md. Matbor Enterprise 3.08 0 07/04/2019
222 GSIDP/PTK/DW-71 Improvemend Of sirajul Haque Mounshi Barri Jame -E-Mosque,Union: Patuakhali Sadar Pourashava.[ Latitude: 22.377829,Longitude: 90.361195] GSIDP patuakhali-s 3.01 Md. Khabir Sikder 2.86 0 07/04/2019
223 GSIDP/PTK/DW-72 Improvement of Auliapur Khash Howlade rJnnatul Jame-E-Mosque,Union : Patudkhali Sadar .[ Latitude: 22.285278,Longitude: 90.50351205] GSIDP patuakhali-s 3.33 Md. Matbor Enterprise 3.16 0 07/04/2019
224 GSIDP/PTK/DW-73 Improvement of Sabujbag Jame -E-Mosque Union : Patuakhali Sadar Pourashava.[ Laitutde: 22.355243,Longitude: 90.341972] GSIDP patuakhali-s 5.21 M/S. Bosir Enteprise 4.95 17/03/2019 05/07/2019 0 07/04/2019
225 GSIDP/PTK/DW-74 Improvement of Dakhin Dharandi Dewanshaha Mazar jame -E-Mosque,Union : Kamlapur ,[Latitude: 22.318695,Longitude: 90.448888] GSIDP patuakhali-s 3.00 M/S. Najmus Shahadat Traders 2.85 17/03/2019 26/06/2019 40 07/04/2019
226 GSIDP/PTK/DW-75 Improvement of Paschim DhaukhaliGazi Bari jame -E-Mosque,Union :Lawkathi .[ Latitude: 22.390360,Longitude; 90.344700] GSIDP patuakhali-s 3.00 A.K.M Moniruzzaman 2.85 17/03/2019 26/06/2019 0 07/04/2019
227 GSIDP/PTK/DW-76 Improvement of Nasrullah Shikder Bari Graveyards Union : Chotobighai [ Latitude: 22.321668,Longitude: 90.228248] GSIDP patuakhali-s 3.00 Mrs. Rahima Traders 2.85 0 07/04/2019
228 GSIDP/PTK/DW-77 Improvement of Lohalia Up mujaffor Ali Mredha Bari Jaem - E-Mosque,Union : Lohalia.[Latitude: 22.373928,Longitude:90.382258] GSIDP patuakhali-s 3.00 M/S. Mahmuda enterprise 2.85 17/03/2019 25/06/2019 0 07/04/2019
229 GSIDP/PTK/DW-78 Improvement of Tangrakhali Darbar Sharif Jame-E-Mosque,Union :Badorpur.[ Latitude: 22.37528,Longitude: 90.304915] GSIDP patuakhali-s 7.91 Md.Bachchu Mia 7.51 0 07/04/2019
230 GSIDP/PTK/DW-79 Improvement of Haji Abdul Karim Khan Gravyard,Union: Badorpur [ Latitude: 22.437445,Longitude: 90.339472] GSIDP patuakhali-s 8.73 M/S. Arun Builders 8.29 17/03/2019 26/06/2019 0 07/04/2019
231 GSIDP/PTK/DW-80 Improvement of Amjad Ali Khan Bari Jame-E-Mosque Cemetery,Union: Kamalpur [Latitude: 22.3055,Longitude:90.4084] GSIDP patuakhali-s 4.18 Shimanto Trading Agency 3.97 20/03/2019 28/06/2019 15 07/04/2019
232 GSIDP/PTK/DW-83 Improvement of Nazir Mollahbarir Gravyards,Union; Longalia [Latitude; 22.360067,Longitude: 90.377540] GSIDP patuakhali-s 3.02 M/S. Najmus Shahadat Traders 2.87 20/03/2019 26/07/2019 35 07/04/2019
233 GSIDP/PTK/DW-84 Improvement of Kasisera Muktizoodha Nasir Uddin Biswas Jam-E-Mosque,Union: Itbaria [Latitude: 22.386980,Longitude: 90.286807] GSIDP patuakhali-s 5.20 M/S. Bepari Traders 4.94 20/03/2019 26/06/2019 30 07/04/2019
234 GSIDP/PTK/DW-85 Improvement of Bottola jam-E-Mosque,Union;Lalikapur [ Latitude: 22.352453,Longitude: 90.32330] GSIDP patuakhali-s 3.37 M/S. South Bengal Engineers 3.21 12/03/2019 19/06/2019 10 07/04/2019
235 GSIDP/PTK/DW-88 Improvement of Bangladesh Sebaasrom Radha Gobindo Mondir Union: Mirjagonj.[Latitude: 22.531,Longitude:90.268] GSIDP patuakhali-s 3.00 M/S. Adarso Enterprise 2.85 20/03/2019 28/06/2019 0 07/04/2019
236 GSIDP/PTK/SDW-90 Improvement of Hazi Asmoth All Eidgha Bazita,Union: Madhobkhali.[ Latitude : 22.36455,Longitude: 90.565028] GSIDP patuakhali-s 13.20 M/S. Tajin Enterprise 12.54 0 07/04/2019
237 GSIDP/PTK/DW-86 Improvement of Nazirpur Fazlu Karim Mredhabari Jam-E-mosque,Union: Lohalia [Latitude; 22.382078,Longitude: 90.37975] GSIDP patuakhali-s 5.06 0.00 0 07/04/2019
238 GSIDP/PTK/SDW-92 Improvement of Sreerampur Bazar Jame mosque ,Union : Lawkathi .[ Latitude: 22.4179,Longitude: 90.3705] GSIDP patuakhali-s 6.07 0.00 0 07/04/2019
239 GSIDP/PTK/SDW-93 Improvement of Char Gobordi baitul Aman Jame Mosque,Union :Muradia [ Latitude :22.422888,Longitude:90.44657666 GSIDP patuakhali-s 8.99 0.00 0 07/04/2019
240 GSIDP/PTK/SDW-99 Improvement of Pukurjana Boro Khan Bari Jame Mosqeu Union : Itbaria .[ Latitude: 22.403492,Longitude: 90.299537] GSIDP patuakhali-s 5.06 0.00 0 07/04/2019
241 GSIDP/PTK/SDW-100 Improvement of Mia Bari Jame Mosque Union : Loukathgi .[ Latitude: 22.4255,Longitude: 90.3729] GSIDP patuakhali-s 4.74 0.00 0 07/04/2019
242 GSIDP/PTK/SDW-101 Improvement of West Bhuria Houlader bari Jame Mosque Union : Kamalpur. [ Latitude: 22.3665,Longitude: 90.4018] GSIDP patuakhali-s 3.37 0.00 0 07/04/2019
243 GSIDP/PTK/SDW-102 Improvement of Charhali Khondokar Bari Jame Mosque Union : Dewlisubidkhali . Latitude : 22.5310,Longitude: 90.2650] GSIDP patuakhali-s 6.91 0.00 0 07/04/2019
244 GSIDP/PTK/DW-50 Improvement of Brammoner Bill Kali Mondir , Union: : Kanakdia.[Latitude:22.4843, Longitude: 90.4756 ] GSIDP patuakhali-s 3.00 Matraders 2.85 29/01/2019 06/05/2019 0 07/04/2019
245 GSIDP/PTK/SDW-62 Improvement of Kazibari Jame Mqosque,Union:Lawkarhi {Latitude:22.4299,Longitude:90.3421.] GSIDP patuakhali-s 5.97 M/S. Zakir Enterprise 5.67 0 04/04/2019
246 GSIDP/PTK/SDW-9 Improvement of Moukaron Cemetery, Union: lowkathi.Latitude :224297, Longitude :903424. GSIDP patuakhali-s 12.10 M/S. Jahedul Traders 11.50 30/07/2018 30/10/2018 0  
247 GSIDP/PTK/DW-10 Improvement of Purbo Auliapur Baitul Falah Jame Mposque, Union: Auliapur [ Latitude: 22.304165, Longitude: 90.363690.] GSIDP patuakhali-s 14.00 M/S.Ahamed Construction 13.30 0  
248 IBRP/Patua/Mirza/Brg-01 Construction of 12.0m Long RCC Girder Bridge Mahiskata Muchibari Bridge-Bazita High School via. Beparibari. Road (East side & Bazita high school) at Ch 2100m IBRP mirjaganj 578764058 12.00 92 148.90 M/S S H Enterprise 124.55 09/11/2019 23/11/2019 17/09/2020 80 114.27 92 21/07/2020
249 IBRP/Patua/Mirza/Brg-02 Construction of 96.0m Long RCC Girder Bridge on Dahkin Jattibunia RHD via H/O Salam Master bari-RHD road (Infront of jattibunia high school) at Ch 0+000m IBRP mirjaganj 578765133 96.00 33 1120.97 M/S Kohinoor Enterprise 1102.98 09/11/2019 23/11/2019 17/09/2020 40 369.07 33 21/07/2020
250 IBRP/Patua/Mirza/Brg-03 Construction of 18.0m Long RCC Girder Bridge RHD (Monasep Sikder Bari) - UZR ( West side Bazita Arshed Dr. Bari) Road via Karikorbari,at Ch 1100m IBRP mirjaganj 578764023 18.00 53 141.85 M/S. Sifat Enterprise 124.03 09/11/2019 23/11/2019 17/09/2020 60 66.35 53 21/07/2020
251 IBRP/Patua/Mirza/Brg-4 Construction of 14.0m Long RCC Girder Bridge on New market R&H- dargabari hat Road via Shishurhat at Ch 1769m IBRP mirjaganj 578764021 14.00 58 113.10 M/S. Sifat Enterprise 97.90 09/11/2019 23/11/2019 17/09/2020 65 56.57 58 21/07/2020
252 IBRP/Patua/Mirza/Brg-05 Construction of 11.0m Long RCC Girder Bridge Mahiskata Muchibari Bridge-Bazita High School via. Beparibari. Road, at Ch 2450m IBRP mirjaganj 578764058 11.00 95 91.90 M/S Khan Enterpris 78.43 09/11/2019 23/11/2019 17/09/2020 98 75.05 95 21/07/2020
253 PATBAU171801 Improvement of Sabupura Bazar Rajnagar Khal under Bauphal Upazila at Patuakhali district IPCP bauphal 5.14 109.50 M/S Rony Enterprise. 104.03 0  
254 IRIDP-2/PTK/DW-123 Improvement of Kalisuri Vasai Mredha house-(Munshur President new house)-South Mankham Bridge road (ch.00-390m) ID. No.578385121 IRIDP-2 bauphal 578385121 0.39 19.91 Md. Zashim Uddin Talukder 19.50 22/06/2017 24/01/2019 68 09/05/2019
255 IRIDP-2/PTK/DW-134 Improvement of Kalisuri-Baherchar UZR-Baherchar Bazar Via Sighar Khati Abdul Khalek Merdha House (ch.1000m-1500m) ID. No. 578384069 0 0 0 1,871,009.00 1,777,458.55 0 IRIDP-2 bauphal 578384069 0.50 18.71 M/S. Authoye Construction 17.77 0 09/05/2019
256 IRIDP-2/PTK/DW-170 (a)Improvement of Bauphal Boga RHD Road Afsarer Grage West Side To Dipasha Bazar (Via SP house) road (ch.00m-450m) ID. No. (b) Construction of 01no 1.00mx1.00m culvert at ch.200m on the same road IRIDP-2 bauphal 578384328 0.45 1.00 21.36 M/S. Gazi Construction 20.29 09/10/2018 16/02/2019 10 09/05/2019
257 IRIDP-2/PTK/DW-171 Improvement of Kalisuri Baherchar UZR-Kalisuri Baherchar UNR Via Rashid Chowkider & Khalek Kondokar Bari road (ch.00m-400m) IRIDP-2 bauphal 578384278 0.40 15.97 M/S. Gazi Construction 15.17 09/10/2018 16/02/2019 50 09/05/2019
258 IRIDP-2/PTK/DW-172 Improvement of Manderbon Eidgha To Karkhana (High School) Pacca Road Via East Side of Shahin Fakir House ( Kachipara Karkhana BC road – Sahin Fakir House road) road (ch.00m-170m) IRIDP-2 bauphal 578384174 0.17 10.10 M/S. Gazi Construction 9.60 09/10/2018 16/02/2019 0 09/05/2019
259 IRIDP-2/PTK/DW-174 Improvement of Modonpura Sonamuddin High School-East Side Of Modonpura Board GPSroad (ch.640m-1000m) IRIDP-2 bauphal 578384204 0.36 21.71 M/S. Gazi Construction 20.62 09/10/2018 16/02/2019 55 09/05/2019
260 IRIDP-2/PTK/DW-175 (a)Improvement of Sharif Bari Bridge-Aroary now GPS-House Of Mayor Heron-Patilapar Hatem Ali GPS.road (ch.850m-1450m) ID. No. 578384144(b)Construction of 01no 1.00mx1.00m culvert at ch.950m on the same road IRIDP-2 bauphal 578384144 0.60 1.00 27.57 M/S. Gazi Construction 26.19 09/10/2018 16/02/2019 10 09/05/2019
261 RIDP-2/PTK/DW-176 (a)Improvement of Kanakdia Kasipara UNR - (Basa Bari Bridge)-Kiratul Quran Madrasha Via Sipahi Bari Dhakil Madrasha.road (ch.00m-700m) ID. No. (b) Construction of 01no 0.625mx0.60m culvert at ch.250m on the same road IRIDP-2 bauphal 578385220 0.70 0.62 28.54 Md. Hemayet Uddin 27.11 09/10/2018 16/02/2019 60 09/05/2019
262 IRIDP-2/PTK/DW-182 Improvement of Kalaiya Bazar. IRIDP-2 bauphal 131.14 M/S. Akon Enterprise 124.58 09/10/2018 15/04/2019 88 09/05/2019
263 IRIDP-2/PTK/DW-193 Improvement of Kalisuri Baherchar UZR- Kalisuri Gopalia via khalek Merdha House (ch.00m-500m) 0 IRIDP-2 bauphal 578384232 0.50 18.77 MS Ali Traders 17.83 0 09/05/2019
264 IRIDP-2/PTK/DW-127 Improvement of Mominpur Kalaiya UZR-Voripasha High School Road (ch.00-500m) ID. No.578385124 IRIDP-2 bauphal 578385124 0.50 27.00 Md. Abdul Aziz Molla 26.78 31/08/2017 20/11/2018 100 07/05/2019
265 IRIDP-2/PTK/DW-173 (a)Improvement of Kachipara-(Health Complex) - Joybangla Bazar-Eidgha Mat -Maderbon Bazar.road (ch.400m-760m) ID. No. (b)Construction of 01no 1.00mx1.00m culvert at ch.550m on the same road 578384110 IRIDP-2 bauphal 578384110 0.36 1.00 16.59 Md. Hemayet Uddin 15.76 09/10/2018 05/02/2019 100 07/05/2019
266 IRIDP-2/PTK/DW-177 (a)Improvement of Momenpur GC Kalayua GC road via Basar Khan House via Buher hat Road (ch.00m-1000m) ID. No. (b) Construction of 02no 0.625mx0.60m culvert at ch.250m ,410m on the same road 578385244 IRIDP-2 bauphal 578385244 1.00 1.25 41.21 Md. Mahbubur Rahman 39.15 09/10/2018 14/02/2019 100 07/05/2019
267 IRIDP-2/PTK/DW-178 Improvement of North Madobpur Durga Mondir-Sorgio Nisikanto Sorkar Bari Road (ch.00m-335m) ID. No. 578385143 IRIDP-2 bauphal 578385143 0.34 13.49 M/S. Deip Enterprise 12.82 09/10/2018 15/02/2019 100 07/05/2019
268 IRIDP-2/PTK/DW-180 Improvement of Kashabpur Mominpur Road-Dr.Moklesur Rhaman House Road (ch.00m-360m) ID. No. 578385123 & Mosque link. 90.0m IRIDP-2 bauphal 578385123 0.45 17.04 M/S. Gazi Construction 16.19 09/10/2018 07/01/2019 100 07/05/2019
269 IRIDP-2/PTK/DW-25 Improvement of Nowmala Nogorer Hat – Hospital – Alea Rahman Ladish GPS Road (Ch.00-600m). IRIDP-2 bauphal 578385130 0.60 25.91 Md. Firoz 21.95 15/03/2016 25/03/2019 100 07/05/2019
270 IRIDP-2/PTK/DW-114 (a) Improvement of Voripasha Khaya Ghat-Morhum Md.Dalil Uddin Master House Via Chowmohoni Bazar & Merdhar Hatroad (ch.00m-1500m) ID. No.578384304(b) Construction of 04no. 0.625mx0.60m culvert at ch.855m,965m,1255m&1385m on the same road. IRIDP-2 bauphal 578384304 1.50 2.25 82.33 Md. Abdul Aziz Molla 74.10 19/06/2017 28/12/2018 100 07/05/2019
271 IRIDP-2/PTK/DW-125 (a) Improvement of Boga-Baherchar GC road (Shaid Jalal GPS)- South side of Siddiq Master House Road (ch.00m-500m) ID. No.(b) Construction of 01no. 0.625mx0.60m culvert at ch.300m on the same road. 578385128 IRIDP-2 bauphal 578385128 0.50 0.62 28.61 Md. Mizanur Alam 28.23 31/08/2017 06/03/2018 100 07/05/2019
272 IRIDP-2/PTK/DW-128 (a) Improvement of Bauphal Dasmina R&H (Hasan Siddik High School) West Site Of kabale House Road.Road (ch.00m-1148m) ID. No.578384208 & Hasan Siddik High School. Link 124m(b) Construction of 04no. 0.625mx0.60m culvert at ch.350m,630m,720m,840m on the same road. IRIDP-2 bauphal 578384208 1.27 2.50 73.11 Brothers Treding, Pro. Md. Al-Amin Sikder 68.46 22/06/2017 25/03/2018 100 07/05/2019
273 IRIDP-2/PTK/DW-190 Improvement of Birpasa Tatultola – Satrokanda GPS road (ch.00m-300m) ID. No. 578385620 0 0 0 1,335,787.00 03 Feb 2019 1,268,997.65 10 May 2019 27 Feb 2019 100 IRIDP-2 bauphal 578385620 0.30 13.35 M/S. Safiqul Enterprise 12.68 03/02/2019 10/05/2019 100 07/05/2019
274 IRIDP-2/PTK/DW-20 a) Improvement of Hosnabad Bazar – Dakhil Madrasha to Kaguji Bari Bazar via Alauddin Gazi Bari JameMosque Road (Ch. 500-1340m). b) Construction of 2Nos 0.625x0.600m Culvert on Same Road at Ch. 1021m & 1126m. IRIDP-2 bauphal 578384286 0.84 1.25 37.51 Md. Akhtaruzzaman 31.45 09/02/2016 30/12/2017 45 07/05/2019
275 IRIDP-2/PTK/DW-24 Improvement of Botkajol Board GPS – Nowmala UPC via Muslimpara Jame Mosque Road (Ch.00-780m). 30 IRIDP-2 bauphal 578385144 0.78 33.69 Md. Firoz 28.50 09/03/2016 30/06/2019 30 07/05/2019
276 IRIDP-2/PTK/DW-102 (a) Improvement of Bauphal-Kalisuri R&H(Chandrapara Jorpool) Dhali Asia Khatun Dhakil Madrasha (ch.00-1300m) ID. No.578384203(b) Construction of 02no 1.0mx1.0m culvert at ch.660m& 1080m on the same road IRIDP-2 bauphal 578384203 1.30 2.00 76.47 M/S. Zakir Enterprise 68.83 30/08/2017 31/12/2018 35 07/05/2019
277 IRIDP-2/PTK/DW-106 (a) Improvement of Joybangla Bazar - Manderbon Bazer Via Pakdal Post Office road (ch.00-800m) ID. No.578384136(b) Construction of 01no. 1.0mx1.0m culvert at ch.375m on the same road(c) Construction of 01no. 0.625mx0.60m culvert at ch.75m on the same road IRIDP-2 bauphal 578384136 0.80 1.62 46.89 Md. Zashim Uddin Talukder 44.48 18/06/2017 24/01/2019 70 07/05/2019
278 IRIDP-2/PTK/DW-112 (a) Improvement of Olipura Nowmala UNR Road-Nowmala BDC Bazar Via Md.Edrish Moll House-Sagor Ali Chowkidar House road (ch.1455m-2455m) ID. No. (b) Construction of 02no. 1.0mx1.0m culvert at ch.1535m&2385m on the same road IRIDP-2 bauphal 578384165 1.00 2.00 59.27 Md. Iqbal Hossain 55.94 19/06/2017 30/05/2019 75 07/05/2019
279 IRIDP-2/PTK/DW-7 Improvement of Dalapara – Moominpur GC – Kalisuri GC- Baherchar GC-Dalapara Anis Maliker Barir Pucca Road to Ponahura Kalikumar Bari via Sulice Gate Road (Ch. 00-500m). IRIDP-2 bauphal 578384130 0.50 21.59 Rezwanul Maksud 20.91 06/03/2016 21/05/2017 100 06/05/2019
280 IRIDP-2/PTK/DW-8 Improvement of Purbo Rajapur Digirpar Bridge – west side of Gosai Kabiraj house Road to Ponahura Kalikumar Bari via Sulice Gate Road (Ch. 00-800m). IRIDP-2 bauphal 578384184 0.80 34.55 Md. Shamim Ahsan 30.76 21/02/2016 02/01/2017 100 06/05/2019
281 IRIDP-2/PTK/DW-9 a) Improvement of Matobber hat (South Side of Gias Mredha House) via North Rajapur GPS road (Ch. 00-500m). b) Construction of 2Nos 0.625x0.600m Culvert on Same Road at Ch. 400m & 450m. IRIDP-2 bauphal 578384188 0.50 1.25 22.82 Md. Abdul Aziz Molla 20.63 18/02/2016 06/08/2016 100 06/05/2019
282 IRIDP-2/PTK/DW-10 a) Improvement of Bauphal H/Q Kalisuri RHD – Surjamoni – Kalisuri – UZR Connecting Road via Late Member Abdur Rashid Mirdha House East Side – Maddy Goaliabaga GPS (Ch.00-420m). b) Construction of 1No 0.625x0.600m Culvert on Same Road at Ch. 285m. 0 0 1,875,536.00 04 Feb 2016 1,613,102.53 30 Mar 2017 06 Aug 2016 100 IRIDP-2 bauphal 578384281 0.42 0.62 18.75 Md. Azahar Uddin 16.13 04/02/2016 06/08/2016 100 06/05/2019
283 IRIDP-2/PTK/DW-11 Improvement of Bauphal Kalisuri GC RHD (Battala) – Indrokul High School & Bazar via Gazimazi High School & Kalikapur GPS (Ch. 00-500m). IRIDP-2 bauphal 578384193 0.50 21.59 Md. Firoz 18.26 19/06/2016 06/08/2016 100 06/05/2019
284 IRIDP-2/PTK/DW-12 Improvement of Road from Surjamoni UPC – Nurainpur – Kanakdia Connecting via Akbaria Dakhil Madrasha (Ch. 00-500m). IRIDP-2 bauphal 578384194 0.50 20.86 Brothers Treding, Pro. Md. Al-Amin Sikder 19.17 18/02/2016 20/05/2017 100 06/05/2019
285 IRIDP-2/PTK/DW-13 Improvement of Birpasha Bazar – Boga- Baherchar GC Connecting Road (Ch. 2735-3035m). IRIDP-2 bauphal 578384198 0.30 12.95 Md. Akhtaruzzaman 10.94 07/02/2016 06/08/2016 100 06/05/2019
286 IRIDP-2/PTK/DW-14 Improvement of Joorpukuria GPS – Dhouravanga GPS – Banajora GPS via Chairman Motalab Howlader House Road (Ch. 00-675m). IRIDP-2 bauphal 578384200 0.68 28.29 Md. Azahar Uddin 24.40 04/02/2016 25/01/2017 100 06/05/2019
287 IRIDP-2/PTK/DW-15 a) Improvement of Daurabanga Chancon Chowkider Shop – Khaukhali Bazar Road (Ch. 00-740m). b) Construction of 1No. 0.625x0.600m Culvert on Same Road at Ch. 480m. IRIDP-2 bauphal 578384202 0.74 0.62 32.58 Md. Azahar Uddin 28.27 04/02/2016 10/01/2017 100 06/05/2019
288 IRIDP-2/PTK/DW-16 Improvement of Modonpura Sonamuddin High School – East Side of Modonpura Board GPS Road (Ch.00-500m). IRIDP-2 bauphal 578384204 0.50 21.59 Md. Abdul Aziz Molla 19.30 18/02/2016 29/09/2016 100 06/05/2019
289 IRIDP-2/PTK/DW-17 a) Improvement of Abdul Aziz Mollah House – Nazirpur High School Road (Ch.00-468m). b) Construction of 1No. 0.625x0.600m Culvert on Same Road at Ch. 465m. IRIDP-2 bauphal 578384206 0.47 0.62 23.13 Md. Azahar Uddin 20.02 08/02/2016 10/08/2016 100 06/05/2019
290 IRIDP-2/PTK/DW-18 a) Improvement of Bouphal Upazila H/Q – Kalaiya UZR at Zammader Bari GPS via Nazirpur Abdul Motaleb Bayati Bari Jame Mosque road (Ch. 00-570m) b) Construction of 1No. 0.625x0.600m Culvert on Same Road at Ch. 380m. IRIDP-2 bauphal 578384100 0.57 0.62 25.23 Md. Azahar Uddin 21.75 04/02/2016 06/08/2016 100 06/05/2019
291 IRIDP-2/PTK/DW-19 Improvement of Kalayia Bogi UNR ( Sikder Bazar) South Saula GPS via SKDC High School Road Ch. 700-1077m IRIDP-2 bauphal 578384207 0.38 15.10 Md. Firoz 13.28 01/02/2016 07/02/2018 100 06/05/2019
292 IRIDP-2/PTK/DW-21 a) Improvement of Olipura Nowmala UNR Road –Nowmala BDC Bazar via Md. Edrish Molla House – Sagor Ali Chowkidar House Road (Ch. 00-800m). b) Construction of 1No. 0.625x0.600m Culvert on Same Road at Ch. 236m. IRIDP-2 bauphal 578384165 0.80 0.62 35.17 M/S. Najmus Shahadat Traders 32.52 09/03/2016 06/03/2017 100 06/05/2019
293 IRIDP-2/PTK/DW-22 a) Improvement of Adabaria Mohasraddi Siddik Merdhar Hat Gulita Mouja Digir per Road (Ch. 00-800m). b) Construction of 1no 0.625x0.600m Culvert on Same Road at Ch. 290m. IRIDP-2 bauphal 578384211 0.80 0.62 33.96 Md. Enayet Hossain 31.97 08/03/2016 25/04/2017 100 06/05/2019
294 IRIDP-2/PTK/DW-23 a) Improvement of Adabaria – Milgor – Atoskhali High School (Ch. 1000-1576m). b) Construction of 1No 0.625x0.600m Culvert on Same Road at Ch. 1125m. IRIDP-2 bauphal 578384213 0.58 0.62 25.49 Md. Enayet Hossain 24.00 20/03/2016 26/04/2017 100 06/05/2019
295 IRIDP-2/PTK/DW-26 Improvement of Mominpur GC – Fazilpur – Vhuar Hat Road (Ch.00-500m). IRIDP-2 bauphal 578385153 0.50 21.59 Rezwanul Maksud 19.87 06/03/2016 28/05/2018 100 06/05/2019
296 IRIDP-2/PTK/DW-27 Improvement of Nowmala dasmina UZR – South Site of Nowar Hat – Hindupara – Banker HalimMia House Road (Ch.120-620m). IRIDP-2 bauphal 578385146 0.50 21.59 M/S. Dr. A. Khalek Biswas Enterprise, Pro. Md. Atikur Rahman (Mamun) 17.96 24/03/2016 27/03/2017 100 06/05/2019
297 IRIDP-2/PTK/DW-28 a) Improvement of Kanakdia – Kalishuri UZR Road star Azaharer Rice Mill to Akbaria Sinior Madrasha via Late Abdul Barak Sikder Bari Road (Kanakdia – Kalisuri UZR to Late Abul Barek Sikder Road (CH. 00-500m). b) Construction of 1No. 0.625x0.600m Culvert on Same Road at Ch. 111m. IRIDP-2 bauphal 578385126 0.50 0.62 22.21 M/S. Sikder Enterprise 20.08 01/03/2016 26/12/2017 100 06/05/2019
298 IRIDP-2/PTK/SDW-64 Construction of 15.0m RCC Girder Bridge on Balia Bazar-Shabupura Bazar via Balia GPS road at ch.1500m IRIDP-2 bauphal 578384042 15.00 85.26 M/S. Jiaul & Brothers, Pro. Khandoker Jiaul Hossain 64.92 09/04/2016 27/03/2017 100 06/05/2019
299 IRIDP-2/PTK/SDW-65 Construction of 15.0m RCC Girder Bridge on Shabupura Tulatola Mor Sikder bari - Dasher howla UZR Connecting road at ch.1150m IRIDP-2 bauphal 578385057 15.00 84.95 M/S. Jiaul & Brothers, Pro. Khandoker Jiaul Hossain 64.21 09/04/2016 25/03/2017 100 06/05/2019
300 IRIDP-2/PTK/SDW-77 (a) Improvement of Kachipara-(Health Complex) - Joybangla Bazar-Eidgha Mat -Maderbon Bazar. Via Rashid chairman house road (ch.00m - 400m) & Mosque link road 380.0m(b) Construction of 01no 1.0mx1.0m culvert at ch.330m on the same road IRIDP-2 bauphal 578384110 0.78 1.00 44.65 Md. Firoz 39.14 08/02/2017 28/03/2018 100 06/05/2019
301 IRIDP-2/PTK/DW-101 (a) Improvement of Kachipara Karkhana BC – Karkhana Lanch Ghat via late Abdur Rob Master house road (ch.00-1100m) ID. No.578384369(b) Construction of 01no. 0.625mx0.60m culvert at ch.360m on the same road IRIDP-2 bauphal 578384369 1.10 0.62 59.86 Sonali Enterprise 55.77 18/06/2017 20/11/2018 100 06/05/2019
302 IRIDP-2/PTK/DW-103 a) Improvement of Nazirpur bangla Bazar Road - Nazirpur high School Via Dipti Bari road (ch.700-825m) ID. No.(b) Improvement of Nazirpur UPC (Dhandi GPS) -Chandapara Bazer Via Sultanabad Bazar.road (ch.600-905m) ID. No.578383039(c) Improvement of Nazirpur High school – Tatuli river via Abul mira bari road (ch.800-955m) ID. No.578384377 578384377 IRIDP-2 bauphal 578384282 0.59 31.07 Md. Abdul Aziz Molla 27.96 18/06/2017 30/04/2018 100 06/05/2019
303 IRIDP-2/PTK/DW-104 (a) Improvement of Madonpura Khan Bari-Jalal Sikder House-Madonpura Board GPS road (ch.00-600m) ID. No.578385020(b) Construction of 01no. 0.625mx0.60m culvert at ch.525m on the same road IRIDP-2 bauphal 578385020 0.60 0.62 34.38 Md. Abdul Aziz Molla 33.86 13/11/2017 25/01/2018 100 06/05/2019
304 IRIDP-2/PTK/DW-105 (a) Improvement of Kanakdia Kachipara Road To Gofur Sikdar House & APS Rafik House road (ch.00-550m) ID. No.(b) Construction of 01no. 1.0mx1.0m culvert at ch.356m on the same road 578385254 IRIDP-2 bauphal 578385254 0.55 1.00 36.52 M/S. Abul Kalam Azad 32.86 18/06/2017 21/09/2018 100 06/05/2019
305 IRIDP-2/PTK/DW-108 (a) Improvement of Kalisuri Baherchar UZR- Kalisuri Gopalia via khalek Merdha House(Sajjal bari – Qran sunna madrasha) road (ch.00-600m) ID. No.(b) Construction of 01no. 1.0mx1.0m culvert at ch.297m on the same road 578384232 IRIDP-2 bauphal 578384232 0.60 1.00 27.48 Md. Basir Uddin 27.38 18/06/2017 20/12/2017 100 06/05/2019
306 IRIDP-2/PTK/DW-109 (a) Improvement of Kachipara-(Health Complex) - Joybangla Bazar-Eidgha Mat -Maderbon Bazar.road (ch.400-1500m) ID. No.578384110(b) Construction of 02no. 0.625mx0.60m culvert at ch.740m & 1240m on the same road IRIDP-2 bauphal 578384110 1.10 1.25 63.59 M/S. Deip Enterprise 63.19 18/06/2017 20/03/2018 100 06/05/2019
307 IRIDP-2/PTK/DW-110 Improvement of Mominpur Bissas Bari-Saber Howlader House-Sikder Bazar road (ch.00-600m) ID. No.578385150 IRIDP-2 bauphal 578385150 0.60 32.38 Md. Abdul Aziz Molla 32.12 31/08/2017 25/12/2018 100 06/05/2019
308 IRIDP-2/PTK/DW-111 (a) Improvement of Bauphal UPC (Bilbilas Bazar)- Keshabpur Bazer via Surjomoni UPC road (ch.400-600m &3670m-4270m) ID. No.(b) Construction of 01no. 0.625mx0.60m culvert at ch.4200m on the same road 578383033 IRIDP-2 bauphal 578383033 0.80 0.62 43.54 Md. Khair Hossain 42.86 14/08/2017 28/05/2018 100 06/05/2019
309 IRIDP-2/PTK/DW-113 (a) Improvement of Adabaria UPC-Hatem Mirder hat-Golabari Hat. Via Hazir Hat road (ch.7700m-8160m) ID. No.578383030(b) Construction of 01no. 1.0mx1.0m culvert at ch.8046m on the same road IRIDP-2 bauphal 578383030 0.46 1.00 28.44 Md. Iqbal Hossain 26.30 19/01/2017 06/05/2018 100 06/05/2019
310 IRIDP-2/PTK/DW-115 Improvement of Boga Bazar Bridge -Dhowravanga west side Foraje Bari Bridgeroad (ch.00-500m) ID. No. 578385129 0 IRIDP-2 bauphal 578385129 0.50 28.50 M/S. Najmus Shahadat Traders 25.65 19/01/2017 28/05/2018 100 06/05/2019
311 IRIDP-2/PTK/DW-116 (a) Improvement of Joorpukuria GPS-Dhouravanga GPS-Banajora GPS via Chairman Motalab howlader house road (ch.750m-1410m) ID. No.(b) Construction of 01no. 1.0mx1.0m culvert at ch.1140m on the same road. 578384200 IRIDP-2 bauphal 578384200 0.66 1.00 38.42 Md. Azahar Uddin 37.84 22/01/2017 25/04/2018 100 06/05/2019
312 IRIDP-2/PTK/DW-117 Improvement of kalaiya Nuru Mia House Road-Jamal Merdha House road (ch.00-500m) ID. No. 578385137 IRIDP-2 bauphal 578385137 0.50 28.74 Sonali Enterprise 27.49 22/01/2017 31/05/2018 100 06/05/2019
313 IRIDP-2/PTK/DW-118 Improvement of Boga Milghor UZR Road-Ashury Hawlader Hat.road (ch.7000-7850m) ID. No.578384065 IRIDP-2 bauphal 578384065 0.85 48.27 Brothers Treding, Pro. Md. Al-Amin Sikder 46.34 22/06/2017 20/03/2018 100 06/05/2019
314 IRIDP-2/PTK/DW-119 Improvement of Kalaiya Bogi Bazar Road-Taro Gor Via Nurul Islam Member House.road (ch.00-370m) ID. No.578385135 IRIDP-2 bauphal 578385135 0.37 20.01 Md. Abdur Rashid Mia 18.00 22/06/2017 25/12/2018 100 06/05/2019
315 IRIDP-2/PTK/DW-120 Improvement of Bauphal Kalaiya Dasmina R&H(kanchon Ali Master) Kotpar Connacting road (ch.00-450m) ID. No. 578385136 IRIDP-2 bauphal 578385136 0.45 24.48 M/S. Sithi Traders 23.26 22/06/2017 30/04/2018 100 06/05/2019
316 IRIDP-2/PTK/DW-121 Improvement of Kalaiya Dasmina R&H wapda Veri(Nur jahan Garden) South Shoula GPS Via Ahmed Ali Kha Jame Mosque road (ch.00-1000m) ID. No.578384210.& Link Mosque and Park-200m IRIDP-2 bauphal 578384210 1.20 69.21 M/S. Monira Enterprise 62.29 22/06/2017 20/03/2018 10 06/05/2019
317 IRIDP-2/PTK/DW-122 (a) Improvement of Birpasha Bazar-(North side)- Bottola Bridge Jabber Shop via Nadu Holader Yousuf Howlader Bariroad (ch.780m-1580m) ID. No.578384196.(b) Construction of 01no. 1.0mx1.0m culvert at ch.1585m on the same road. IRIDP-2 bauphal 578384196 0.80 1.00 46.30 M/S. Zakir Enterprise 43.87 22/06/2017 28/05/2018 100 06/05/2019
318 IRIDP-2/PTK/DW-124 Improvement of Daspara Bas Stand-Aziz Howlader-House Of Alauddin Road (ch.00-400m) ID. No.578385154 IRIDP-2 bauphal 578385154 0.40 22.64 M/S. Sithi Traders 21.33 22/06/2017 30/05/2018 100 06/05/2019
319 IRIDP-2/PTK/DW-126 (a) Improvement of Mominpur GC-Fazilpur-Vhuar Hat Road (ch.500m-1000m) ID. No.578385153. & Mosq. Link 150m(b) Construction of 01no. 0.625mx0.60m culvert at ch.620m on the same road. IRIDP-2 bauphal 578385153 0.65 0.62 33.92 Md. Abdul Aziz Molla 33.56 08/11/2017 15/12/2018 100 06/05/2019
320 IRIDP-2/PTK/DW-95 (a) Improvement of Alipura -Kalagachia GC- B.B Roy High school road (ch.00m - 1150m)(b) Construction of 01no 1.50mx1.50m culvert at ch.300m on the same road.(c) Construction of 01no 3.0mx3.0m culvert at ch.750m on the same road. IRIDP-2 dashmina 578524069 1.15 4.50 78.13 Shafiqur Rahman 70.32 25/04/2017 05/06/2018 100 12/05/2019
321 IRIDP-2/PTK/DW-96 Improvement of Nizabad Asrayan UZR-Ranua Hat via Mirmadon GPS road (ch.1950m - 3500m) IRIDP-2 dashmina 578524050 1.55 79.57 M/S. Abul Kalam Azad 79.36 25/04/2017 30/10/2018 100 12/05/2019
322 IRIDP-2/PTK/DW-97 Improvement of Dasmina UP- Dashmina Upazila Border via Mollar hat.road (ch.6720m - 8250m)Construction of 3 nos 1.50mx1.50m Culvert at ch. 7020m, 7270m & 7730m on the same Road. IRIDP-2 dashmina 578523003 1.53 4.50 90.65 M/S. Selim Store 90.65 25/04/2017 30/04/2019 65 12/05/2019
323 IRIDP-2/PTK/DW-149 (a)Improvement of CharBorhan Launchghat-Birazer Kheyaghat road (ch.00-1750m) ID. No.578524001(b)Improvement of Maddya Char Borhan Reg. P.School-Cyclone Sheltre..road (ch.600-2100m) ID. No.578524005(c) Construction of 02no. 2.0mx2.0m culvert at ch.1400m&1930m on the same road IRIDP-2 dashmina 578524005 3.25 4.00 229.59 M/S. Abul Kalam Azad 240.01 10/12/2017 30/01/2019 75 12/05/2019
324 IRIDP-2/PTK/SDW-168 Improvement of Nizabad Asrayan UzR-Ranua Hat via Mirmadon GPS road (ch. 3500m-4040m) ID No. 578524050 IRIDP-2 dashmina 578524050 0.54 41.72 M/S. Palli Stores,Pro. Md. Golam Sawrar (Badal) 39.64 19/08/2018 25/01/2019 15 12/05/2019
325 IRIDP-2/PTK/DW-32 (a)Improvement of Alipur UP – koatkhali Bazar via Kalamiar Hat ( Dashmina Part) Road ( Ch. 4823-5308m) ( Alipur UP – Patabunia GC) b) Construction of 1No. 1.5mx1.5m Culvert on Same Road at Ch. 5143m. IRIDP-2 dashmina 578523006 0.49 1.50 32.25 M/S. Milenium Traders 26.91 06/06/2016 30/08/2017 100 09/05/2019
326 IRIDP-2/PTK/DW-33 Improvement of Labukhali Galachipa RHD near Panchom Ali Bepari - Labukhali Galachipa RHD – Alipur GC UZR via Uttar Arojbegi GPS ( RHD Road near Sobhan Bapari House to North Arozbagi GPS) Road (Ch. 00-600m). IRIDP-2 dashmina 578525191 0.60 32.78 M/S. Milenium Traders 26.65 06/06/2016 06/08/2016 100 09/05/2019
327 IRIDP-2/PTK/DW-34 Improvement of Hazir Hat UZR-Dhandhania Wapda Bari Bandh Road (Ch.800m-1975m). IRIDP-2 dashmina 578524017 1.18 65.29 M/S. Palli Stores,Pro. Md. Golam Sawrar (Badal) 56.80 06/04/2016 26/01/2017 100 09/05/2019
328 IRIDP-2/PTK/DW-35 Improvement of Dasmina Arojbegi UNR near Nowab Ali Hazi Bari Battala Mosque - Laksmipur GPS via Ributi Mondal House Road ( Ch. 00-950m). IRIDP-2 dashmina 578524116 0.95 51.35 M/S. Sunrise Construction, Pro. Md. Kamal Hossain 47.72 09/03/2016 25/11/2017 100 09/05/2019
329 IRIDP-2/PTK/DW-36 Improvement of Betagi Thakurer Hat – Bottala Bazar Road (Ch.1200 - 2800m). IRIDP-2 dashmina 578524079 1.60 42.20 M/S. Hima Bricks, Pro. Mrs. Fatema Enayet Bithi 39.45 20/03/2016 06/08/2016 100 09/05/2019
330 IRIDP-2/PTK/DW-61 Improvement of Dumki Satani Chowkiderbari Al-Modina Mosque - H/O Jalal Master - Ujjan Ali Munshi (Labukhali-Boga RHD (H/O Somer UddinChowkider) -Angari road (Ch.00m - 550m). IRIDP-2 dumki 578964072 0.55 15.87 H/O Khorshed Howlader 14.17 27/03/2016 30/03/2017 15 06/05/2019
331 IRIDP-2/PTK/DW-68 (a) Improvement of Angaria UPC (Baher chor ferry ghat) - Razakhali Bazar via T&T, Kadamtala Bazar.road (ch.867m - 1237m)(b) Construction of 01no 1.00mx 1.00m culvert at ch.1052m on the same road IRIDP-2 dumki 578963002 0.37 1.00 24.50 M/S. Nisha Enterprise 19.83 10/10/2016 28/02/2018 55 06/05/2019
332 IRIDP-2/PTK/DW-83 (a) Improvement of Angaria UPC(Baher Chor Ferry Ghat)-Razakhali Bazar via T&T, Kadamtala Bazar.road (ch.1237m - 1603m)(b) Construction of 01no 1.0mx1.0m culvert at ch.1240 m on the same road(b) Construction of 01no 6.10m culvert at ch.862m on the same road IRIDP-2 dumki 578963002 0.37 7.10 40.52 Md. Giusuddin 36.46 25/04/2017 27/11/2018 100 30/04/2019
333 IRIDP-2/PTK/DW-55 Improvement of Dumki Union Connecting Road (Khurmatala Bridge) - H/O Jahanara Member road (Ch.467m - 1017m). IRIDP-2 dumki 578964098 0.55 15.97 Md. Firoz 15.00 11/04/2016 10/06/2017 100 29/04/2019
334 IRIDP-2/PTK/DW-56 Improvement of South Muradia S.M. Kalagacia GPS-North side H/O doctor Edrish Ali Khan road (Ch.600m -1000m) IRIDP-2 dumki 578964152 0.40 11.08 Md. Firoz 10.39 11/04/2016 17/07/2016 100 29/04/2019
335 IRIDP-2/PTK/DW-57 Improvement of Angaria UP- Upazila H/Q RHD via Dumki GPS road (Ch.00m -550m) IRIDP-2 dumki 578963011 0.55 16.40 Md. Shamim Ahsan 16.33 24/03/2016 30/06/2016 100 29/04/2019
336 IRIDP-2/PTK/DW-58 Improvement of Angaria UP (MontuMirdha Bari)-nasir Bari Bridge road (Ch.00m - 550m) IRIDP-2 dumki 578963008 0.55 15.44 Md. Shamim Ahsan 15.32 24/03/2016 30/11/2016 100 29/04/2019
337 IRIDP-2/PTK/DW-59 Construction of 3.0mx3.0m Culvert on Angaria UP-North side H/O Abubakar (West Jharta) road at Ch.200m) IRIDP-2 dumki 578963009 3.00 12.31 Suresh Chandra Bishwas 8.94 27/03/2016 02/08/2016 100 29/04/2019
338 IRIDP-2/PTK/DW-60 Improvement of Dumki Satani H/O (AsmanGazi)-Holagachia via Dumki Satani GPS road (Ch.00m -600m). IRIDP-2 dumki 578965081 0.60 17.17 Suresh Chandra Bishwas 14.97 27/03/2016 02/08/2016 100 29/04/2019
339 IRIDP-2/PTK/DW-62 Improvement of Angaria Hatem Ali Atem Khana (H/O Abu Chairman) - H/O Bajlu member via H/O Giash Uddin road (Ch.00m - 626m) IRIDP-2 dumki 578965142 0.63 18.83 M/S. Deip Enterprise 18.83 28/03/2016 03/07/2016 100 29/04/2019
340 IRIDP-2/PTK/DW-69 (a) Improvement of Atharogachia Dakhli Madrasha - East Kartikpasha H/O Joynal Fakir.road (ch.00m - 2250m)(b) Construction of 02nos 1.00mx 1.00m culvert at ch.404m & 652m on the same road IRIDP-2 dumki 578965083 2.25 2.00 129.04 M/S. Selim Store 109.03 02/10/2016 04/04/2018 100 29/04/2019
341 IRIDP-2/PTK/DW-70 (a) Improvement of East Karticpasha (H/O Aziz Mirah) - East Karticpasha road (ch.00m - 1210m)(b) Construction of 02nos 1.00mx 1.00m culvert at ch.226m & 920m on the same road 0 0 7,127,175.00 10 Oct 2016 5,706,378.63 31 Mar 2018 28 Mar 2018 100 IRIDP-2 dumki 578964153 1.21 2.00 71.27 Suresh Chandra Bishwas 57.06 10/10/2016 28/03/2018 100 29/04/2019
342 RIDP-2/PTK/DW-78 (a) Improvement of Angaria (Baher Char RHD) H/O Malek Mridha - H/O Ali Howlader via H/O Moulana Nashir Uddin road (ch.00m - 580m)(b) Construction of 01no 1.0mx1.0m culvert at ch.130m on the same road IRIDP-2 dumki 578965143 0.58 1.00 22.10 Sonali Enterprise 21.70 25/04/2017 05/02/2018 100 29/04/2019
343 IRIDP-2/PTK/DW-79 Improvement of Angaria UP (H/O muntu Mridha, West jhatra GPS) – H/O Nashai Bridge road (ch.180m - 1500m) IRIDP-2 dumki 578963008 1.32 43.53 Sonali Enterprise 42.79 25/04/2017 04/03/2018 100 29/04/2019
344 IRIDP-2/PTK/DW-80 Improvement of Angaria UP - UZHQ Via Dumki GPS road (ch.550m - 862m & 1292m-1692m) IRIDP-2 dumki 578963011 0.71 25.44 Sonali Enterprise 24.87 25/04/2017 03/04/2018 100 29/04/2019
345 IRIDP-2/PTK/DW-81 (a)Improvement of Dumki Union Connecting Road (Khurmatala baridge) - Jatra Jahanara Member bari road (ch.1010m - 1830m)(b) Construction of 01no 1.0mx1.0m culvert at ch.1192m on the same road IRIDP-2 dumki 578964098 0.82 1.00 29.60 Sonali Enterprise 29.01 25/04/2017 04/03/2018 100 29/04/2019
346 IRIDP-2/PTK/DW-82 Improvement of Jhatra Napit bari -Kadomtala bazar (H/O habib houlader bari) road (ch.680m - 1700m) IRIDP-2 dumki 578964002 1.02 47.76 Sonali Enterprise 47.22 25/04/2017 04/03/2018 100 29/04/2019
347 IRIDP-2/PTK/DW-84 Improvement of Angaria Hatem Ali Atim Khana (H/O Abu Chairman) - H/O Bajlu Member bari via H/O Gias Uddin road (ch.626m - 926m) IRIDP-2 dumki 578965142 0.30 10.11 Sonali Enterprise 9.96 25/04/2017 04/03/2018 100 29/04/2019
348 IRIDP-2/PTK/DW-85 (a)Improvement of Lebukhali-Bauphal RHD(Nisi Mondal Bari)-Angaria U.P via Rob Talukder Bari road (ch.00m - 490m)(b) Construction of 01no 1.0mx1.0m culvert at ch.169m on the same road IRIDP-2 dumki 578964023 1.00 0.49 19.47 uresh Chandra Bishwas 18.22 25/04/2017 10/10/2017 100 29/04/2019
349 IRIDP-2/PTK/DW-86 Improvement of Jamla Bridge - Muradha Baro Sikder Bari via Gabtali Bazar road (ch.1535m - 2095m) IRIDP-2 dumki 578964067 0.56 18.16 Sonali Enterprise 17.99 25/04/2017 03/02/2018 100 29/04/2019
350 IRIDP-2/PTK/DW-87 Improvement of Sreerampur UPC (Labukhali Boga RHD) -Gabtali Bazar via LAM United Mohela College & High School road (ch.00m - 500m) IRIDP-2 dumki 578963003 0.50 30.64 M/S. Palli Stores,Pro. Md. Golam Sawrar (Badal) 27.57 25/04/2017 30/10/2017 100 29/04/2019
351 IRIDP-2/PTK/DW-88 (a)Improvement of Algi Musa Mirdha Bari (Bridge) - Shorb Mirdha & Moulana Habibur Rahman house Bari road (ch.300m - 900m)(b) Construction of 01no 1.0mx1.0m culvert at ch.450m on the same road IRIDP-2 dumki 578964109 0.60 1.00 22.58 Sonali Enterprise 22.11 25/04/2017 08/04/2018 100 29/04/2019
352 IRIDP-2/PTK/DW-89 Improvement of West Muradia west wapda -Bimal BISwas Bari (infront carpeting road) road (ch.00m - 550m) IRIDP-2 dumki 578965016 0.55 18.02 Sonali Enterprise 17.82 25/04/2017 04/02/2018 100 29/04/2019
353 IRIDP-2/PTK/DW-90 Improvement of Panchyet Hat - Basiria Senior Madrasha via Taltali Bazar road (ch.00m - 550m) IRIDP-2 dumki 578964124 0.55 17.94 Sonali Enterprise 17.77 25/04/2017 04/03/2018 100 29/04/2019
354 IRIDP-2/PTK/DW-91 Improvement of Raja Rahamatullha Jalisha T&T Road - Amin Ghata khal gora (valu gain bari) road (ch.355m - 1000m) IRIDP-2 dumki 578964111 0.65 20.98 Sonali Enterprise 20.67 25/04/2017 03/04/2018 100 29/04/2019
355 IRIDP-2/PTK/DW-92 Construction of 01no 3.0mx3.0m culvert at ch.450m on the Labukhali UP – Near lhe H/O Mokbul Sharif ( West Lebukhali) road IRIDP-2 dumki 578965156 3.00 13.02 M/S. Mohiuddin Ahmed 11.71 25/04/2017 28/05/2017 100 29/04/2019
356 IRIDP-2/PTK/DW-129 Improvement of Keshabpur GPS (Bazar) – Basak bazar via Kesabpur Talukder bari (Jainkati UP- Bashak Bazar Via Keshabpur bazar) road (ch.2700-3280m) IRIDP-2 dumki 578953055 0.58 20.11 Syed Md. Sohel 19.96 11/10/2017 20/02/2018 100 29/04/2019
357 IRIDP-2/PTK/DW-52 Improvement of H/O Raja RahametUllah - Amin Ghata Khal gora road (Ch.00m - 800m). IRIDP-2 dumki 578965030 0.80 23.54 Md. Shamim Ahsan 23.44 24/03/2016 30/10/2016 100 28/04/2019
358 IRIDP-2/PTK/DW-54 Improvement of Labukhali - Boga RHD - H/O Nasimondol via H/O A Rob Talukder road (ch.487m -1187m). IRIDP-2 dumki 578964023 0.70 20.78 Suresh Chandra Bishwas 17.80 27/03/2016 27/02/2017 100 28/04/2019
359 IRIDP-2/PTK/DW-74 (a) Improvement of Baher Gazalia WAPDA - Jamaddar bari - Isadi Chander hat road (ch.3450m - 6000m)(b) Construction of 02nos 0.625mx0.60m culvert at ch.4550m & 5250m on the same road. IRIDP-2 galachipa 578574077 2.55 1.25 113.54 Md. Asadur Rahman 96.63 10/10/2016 25/05/2018 100 12/05/2019
360 IRIDP-2/PTK/DW-75 (a) Improvement of Kala raja hat - Horidebpur high School (katakhali Madrasha) road (ch.1550m - 2550m)(b) Construction of 01no 2.0mx2.0m culvert at ch.2150m on the same road. IRIDP-2 galachipa 578574016 1.00 2.00 50.07 M/S. Ruma Bricks 42.56 10/10/2016 05/12/2017 100 12/05/2019
361 IRIDP-2/PTK/DW-76 (a) Improvement of south Kapalbera Bazar - Baro Shiba Matir Killa (Closser) road (ch.1000m - 2000m)(b) Construction of 01no 0.625mx0.60m culvert at ch.1650m on the same road. IRIDP-2 galachipa 578574075 1.00 0.63 44.67 M/S. Gazi Construction 42.03 27/09/2019 17/06/2017 100 12/05/2019
362 IRIDP-2/PTK/MW-152 Maintenance of Atkhali UZR-Chandrail UNR [Galachipa (Atkhali)-Gazalia FWC) Road (00-5250m) ID. No.[578574141] IRIDP-2 galachipa 578574141 5.25 73.32 M/S. Kohinoor Enterprise 65.99 21/09/2017 20/01/2018 100 12/05/2019
363 IRIDP-2/PTK/SDW-153 (a)Improvement of Sekander kari house to North WAPDA road (ch.00-1000m) ID. No. 578574168(b) Construction of 02no 0.625mx0.60m culvert at ch.325m&830m on the same road IRIDP-2 galachipa 578574168 1.00 1.25 45.72 M/S. Kabir Traders 41.15 08/11/2017 10/05/2018 100 12/05/2019
364 IRIDP-2/PTK/DW-155 Improvement of South Kapalvera Bazar – North Charbiswash FRB (Closure Bazar) road (ch.00-1850m) ID. No. 578574399 IRIDP-2 galachipa 578574399 1.85 109.19 M/S. Saibal Enterprise 106.56 18/01/2018 25/12/2018 100 12/05/2019
365 IRIDP-2/PTK/DW-157 Improvement of Bangabandhu Sriti UZR-dakkin Purbo Ulania GPs via Gramardon GPS road (ch.2150-3300m) ID. No. 578574227 IRIDP-2 galachipa 578574227 1.15 68.16 M/S. Saibal Enterprise 66.55 18/01/2018 20/10/2018 100 12/05/2019
366 IRIDP-2/PTK/DW-72 Improvement of Galachipa H/Q.-Galachipa UP to WAPDA road (ch.5370m - 7370m) IRIDP-2 galachipa 578573010 2.00 107.27 Md. Asadur Rahman 91.25 10/10/2016 30/05/2019 25 12/05/2019
367 IRIDP-2/PTK/DW-156 (a)Improvement of Galachipa College-H/O Abu Baker siddique (Samudafath road Ratandi GPS) road (ch.00-1760m) ID. No. 578574047(b) Construction of 03no 0.625mx0.90m culvert at ch.57m,500m&660m on the same road(c) Construction of 01no 1.50mx1.50m culvert at ch.930m on the same road IRIDP-2 galachipa 578574047 1.76 3.38 112.92 M/S. Snehangsu Sarkar 109.50 18/01/2018 24/01/2019 65 12/05/2019
368 IRIDP-2/PTK/SDW-191 (a)Improvement of Sekander kari house to North WAPDA road (ch.1000m-1550m) ID. No. 578574168(b) Construction of 01no 0.60mx0.60m culvert at ch.1200m on the same road IRIDP-2 galachipa 578574168 0.55 0.60 53.65 Md. Khokon Shikder 50.97 31/01/2019 08/08/2019 20 12/05/2019
369 IRIDP-2/PTK/DW-29 (a)Improvement of Amkhola UP- Sehakati Hat road(ch.3700m-5100m)b) Construction of 1No. 0.625x0.600m Culvert on Same Road at Ch. 3750m. IRIDP-2 galachipa 578573001 1.40 0.62 75.57 Mizanur Rahman Monir 64.42 19/04/2016 07/02/2018 100 09/05/2019
370 IRIDP-2/PTK/DW-30 Improvement of Baher Gazalia Madrasha -WAPDA road( ch.2000m-3740m) IRIDP-2 galachipa 578575027 1.74 76.06 Mizanur Rahman Monir 64.16 19/04/2016 29/03/2018 100 09/05/2019
371 IRIDP-2/PTK/DW-31 Improvement of Patabunia Chomed Khan-Joynal Howlader House road(ch.00m-350m) IRIDP-2 galachipa 578575015 0.35 15.11 M/S. Sunrise Construction, Pro. 14.20 09/03/2016 15/09/2016 100 09/05/2019
372 IRIDP-2/PTK/DW-71 (a) Improvement of Galabaria Bazar - Kallayan Kalos .road (ch.2000m - 3500m)(b) Construction of 01no 0.625mx0.60m culvert at ch.2350m on the same road IRIDP-2 galachipa 578573006 1.50 0.63 81.20 M/S. Najmus Shahadat Traders 77.87 10/10/2016 27/04/2018 100 09/05/2019
373 IRIDP-2/PTK/DW-73 (a) Improvement of Choto Shiba FRB - Baro Shiba Launch ghat road (ch.1700m - 3950m)(b) Construction of 01no 2.00mx 2.00m culvert at ch.3350m on the same road(c) Construction of 01no 0.625mx 0.60m culvert at ch.3650m on the same road IRIDP-2 galachipa 578573030 2.25 2.63 127.84 M/S. Selim Store 108.66 02/10/2016 08/07/2017 100 09/05/2019
374 IRIDP-2/PTK/DW-165 (a)Improvement of Tieakhali UPC - RHD (Biskani) road (ch.884m-2100m) ID. No. 578665307(b) Construction of 01no 2.60mx4.0m culvert at ch.1708m on the same road IRIDP-2 kalapara 578665307 1.22 2.60 88.31 H.M. Delowar Hossain 86.65 29/03/2018 05/01/2019 62 13/05/2019
375 IRIDP-2/PTK/DW-187 (a)Improvement of Gohinkhali UZR - South Fulkhali GPS - WAPDA UNR .road (ch.00m-1250m) ID. No. 578584146(b) Construction of 01no 0.625mx0.60m culvert at ch.1050m on the same road IRIDP-2 kalapara 578584146 1.25 0.62 95.70 M/S. Bhuyia Construction 90.92 21/01/2019 28/07/2019 60 13/05/2019
376 IRIDP-2/PTK/SDW-192 (a)Improvement of Badur toli - South Teakhali GPS ( Badurtoly villg. Hafez Jommaddar – Salam miara house ) road (ch.00m-1000m) ID. No. 578664039 & Link road 250.0m(b) Construction of 02no 0.60mx0.60m culvert at ch.300m,900m on the same road IRIDP-2 kalapara 578664039 1.25 1.20 95.78 M/S. Safiqul Enterprise 90.99 03/02/2019 10/12/2019 5 13/05/2019
377 IRIDP-2/PTK/DW-37 (a)Improvement of Road Gilatala GPS - Pachim Wapda (Ch. 2700m-4505m) b) Construction of 1No. 2.0mx2.0m Culvert on Same Road at Ch.2925m. c) Construction of 1No.0.60mx0.60m Culvert on Same Road at Ch.4200m. IRIDP-2 kalapara 578664044 1.81 2.60 69.03 M/S. Palli Stores,Pro. Md. Golam Sawrar (Badal) 68.14 09/03/2016 14/03/2017 100 12/05/2019
378 IRIDP-2/PTK/DW-38 Improvement of road Baliatali Chapli Bazar GCC Road - Bayddaopara Road(Ch.00m-1500m). IRIDP-2 kalapara 578665204 1.50 51.67 M/S. K.K. Enterprise, Pro. Md. Kabir Hossain 50.95 25/02/2016 06/08/2016 100 12/05/2019
379 IRIDP-2/PTK/DW-39 (a) Improvement of Lamupara Zafer Talukder House-Amtolipara Khaleque khan house road (ch. 00-2375m). (b) Construction of 3 nos 0.60mx0.60m culvert on the same road at (ch. 535m, 670m & 2335m) IRIDP-2 kalapara 578665153 2.38 1.80 86.11 M/S. Hima Bricks, Pro. Mrs. Fatema Enayet Bithi 83.18 08/03/2016 15/02/2017 100 12/05/2019
380 IRIDP-2/PTK/DW-40 (a) Improvement of Dalbugonj High School-Fulbunia Kheya Ghat road at (Ch. 00-1769m) (b) Construction of 2 nos 0.60mx0.60m Culvert at ch.1400m &1725m on the same road (c) Construction of 2 nos 3.30mx 3.00m culvert at ch. 668m&1037m on the same road 0 0 7,067,861.00 23 Feb 2016 7,067,861.00 31 Dec 2017 31 Dec 2017 100 IRIDP-2 kalapara 578664045 1.77 7.80 70.67 Shafiqur Rahman 70.67 23/02/2016 31/12/2017 100 12/05/2019
381 IRIDP-2/PTK/DW-41 (a) Improvement of Kathalpara Noor High-Howlader Bari road (ch. 00-2000m) (b) Construction of 01no 1.50mx 1.50m culvert at ch.1210m on the same road IRIDP-2 kalapara 578665139 2.00 1.50 74.54 Md. Enayet Hossain 68.00 19/04/2016 22/03/2018 100 12/05/2019
382 IRIDP-2/PTK/DW-42 (a) Improvement of Baro Baliatali GCCR-Latif Chaklader house road a (ch. 00-2675m) (b) Construction of 0.60mx0.60m Culvert at ch.2290m on the same road (c) Construction of 01no 1.50mx1.50m Culvert at ch. 1100m on the same road (d) Construction of 01 no 3x4.00x4.00m Culvert at ch.1925m on the same road . IRIDP-2 kalapara 578665037 2.68 14.10 119.09 M/S. Snehangsu Sarkar 107.68 09/03/2016 27/08/2017 100 12/05/2019
383 IRIDP-2/PTK/MW-43 Maintenance of Borobaliatoli Nolbunia After ali Matubber Bari - Degor baliatoli Bridge via G.C.C. road (ch.00m-4250m) ID. No. 578665246 IRIDP-2 kalapara 578665246 4.25 36.59 M/S. Gazi Enterprise 34.59 18/03/2018 01/04/2018 100 12/05/2019
384 IRIDP-2/PTK/DW-162 Improvement of Salimpur Bazar - Nilgonj UPC Via Tongibaria GPS road (ch.1940m-4072m) ID. No. 578663008 IRIDP-2 kalapara 578663008 2.13 130.09 Md. Yousuf Ali 127.49 29/03/2018 02/01/2019 100 12/05/2019
385 IRIDP-2/PTK/DW-163 (a)Improvement of Khalilpur RHD -Doulatpur GPS – WAPDA road (ch.00m-2075m) ID. No. 578665256(b) Construction of 01no 0.600mx0.60m culvert at ch.150m on the same road IRIDP-2 kalapara 578665256 2.08 0.60 110.01 M/S. Najmus Shahadat Traders 114.40 20/08/2018 02/04/2019 100 12/05/2019
386 IRIDP-2/PTK/DW-98 Improvement of Lalua UPC-nilgonj UPC Road.Via Baliatoli UPC, Mithagong UPC road (Ch.13245-16945m)(b) Construction of 03no 1.50mx1.50m culvert at ch.13345m,15525m& 16045m on the same road(c) Construction of 02no 0.60mx0.60m culvert at ch.15173m&15345 on the same road IRIDP-2 kalapara 578663004 3.70 5.70 228.74 M/S. Santu Traders 205.86 11/05/2017 17/05/2017 0 12/05/2019
387 IRIDP-2/PTK/SDW-99 (a) Improvement of Tagachia Bazar - Mithagonj Gazir Bazar Road via Modokhali Dakkail madrasha, Bishakhola bridge (ch.6050-8500m)(b) Construction of 02no 0.60mx0.60m culvert at ch.6350m& 6540m on the same road IRIDP-2 kalapara 578665279 2.45 1.20 135.33 M/S. Santu Traders 121.80 25/04/2017 25/12/2018 60 12/05/2019
388 IRIDP-2/PTK/DW-100 (a) Improvement of Baliatulli – Karmazaparra via Modupara road (ch.00-4915m)(b) Construction of 02no 1.50mx1.50m culvert at ch.3260m&4335m on the same road Road ID: (c) Construction of 01no 0.60mx0.60m culvert at ch.1100m on the same road 578665004 IRIDP-2 kalapara 578665004 4.92 3.60 281.74 M/S. Santu Traders 253.56 11/05/2017 31/05/2019 15 12/05/2019
389 IRIDP-2/PTK/DW-160 (a)Improvement of Baharchar Bazar - Neta bazar via Nadu pada. road (ch.1976m-3646m) ID. No. 578584229(b) Construction of 01no 2.0mx2.0m culvert at ch.2750m on the same road(c) Construction of 01no 0.60mx0.90m culvert at ch.3060m on the same road IRIDP-2 kalapara 578584229 1.67 2.60 188.29 M/S. Mohiuddin Ahmed 188.25 29/03/2018 05/04/2019 10 12/05/2019
390 IRIDP-2/PTK/DW-164 (a)Improvement of Monihapur - Mowlamer khal road (ch.00m-950m) ID. No. 578665007(b) Construction of 01no 0.600mx0.60m culvert at ch.320m on the same road IRIDP-2 kalapara 578665007 0.95 0.60 60.75 Brothers Treding, Pro. Md. Al-Amin Sikder 60.20 20/03/2018 05/10/2018 70 12/05/2019
391 IRIDP-2/PTK/SDW-189 (a)Improvement of Kesmath sree nagor high school-Barrerdhone River ( Kismat sreenagar high school – Laximipura bridge) road (ch.00m-1650m) ID. No. 578764050(b) Construction of 01no 1.50mx1.50m culvert at ch.750m on the same road IRIDP-2 mirjaganj 578764050 1.65 1.50 114.38 M/S. Munim Enterprise 108.66 20/03/2019 26/08/2019 0 06/05/2019
392 IRIDP-2/PTK/SDW-158 (a)Improvement of Gazipur hat-H/O Tajem Hawlader-Gabua GPS-RHD at Amrajuri road (ch.00-1500m) (b) Construction of 03no 1.50mx1.50m culvert at ch.132m,542m&812m on the same road IRIDP-2 mirjaganj 578764073 1.50 4.50 81.80 M/S. Snehangsu Sarkar 79.00 18/01/2018 20/10/2018 100 30/04/2019
393 IRIDP-2/PTK/DW-159 (a)Improvement of Dakkhin Mazidbaria Gazi Bari Pool - Mizan-Dulal Bari road (ch.465-605m) ID. No. (b) Construction of 01no 1.50mx1.50m culvert at ch.465m on the same road 578765199 IRIDP-2 mirjaganj 578765199 0.14 1.50 17.92 M/S. Palli Stores,Pro. Md. Golam Sawrar (Badal) 16.13 18/01/2018 04/05/2018 100 30/04/2019
394 IRIDP-2/PTK/DW-46 Improvement of Golderbari – Nuria Dakhil Madrasha-H/O Razzaque Mollah at Sreemonto River road (Ch. 1700-3150m). IRIDP-2 mirjaganj 578764003 1.45 40.76 Siful Enterprise 37.60 28/03/2016 29/07/2016 100 28/04/2019
395 IRIDP-2/PTK/DW-47 Improvement of Dakhin Mozidbaria Gazi Bari pool - mizan,Dulal Bari road (Ch.00m - 465m). IRIDP-2 mirjaganj 578765199 0.47 14.91 Md. Shamim Ahsan 14.81 24/03/2016 28/06/2016 100 28/04/2019
396 IRIDP-2/PTK/DW-48 Improvement of Shing Bari - Kewabunia Sluice gate via Dakhin Kakrabunia RPS road (Ch.00m - 960m). IRIDP-2 mirjaganj 578764101 0.96 29.85 Syed Md. Sohel 31.32 28/03/2016 03/07/2016 100 28/04/2019
397 IRIDP-2/PTK/DW-49 Improvement of Gabua Nabab Ali Kerani Bari - Blaiet Member Bari - Aziz Howlader Bari -Tazuddin Master Bari road (ch. 00-498m). IRIDP-2 mirjaganj 578765201 0.50 14.88 Md. Shamim Ahsan 13.92 24/03/2016 05/05/2018 100 28/04/2019
398 IRIDP-2/PTK/DW-50 Improvement of Batamara GPS – Dakhin Gabua Reg. Pry. School via Latif Chairman Bari road (Ch.800m -1475m). IRIDP-2 mirjaganj 578765098 0.68 19.86 S.M Trading 20.71 28/03/2016 27/03/2017 100 28/04/2019
399 IRIDP-2/PTK/DW-51 Improvement of Angaria UP - Rajakhali Bazar via T&T Kadamtala Bazar road (Ch 00m - 626m). IRIDP-2 mirjaganj 578963002 0.63 18.56 S.M Trading 19.34 28/03/2016 03/07/2016 100 28/04/2019
400 IRIDP-2/PTK/SDW-93 (a) Improvement of Daritaluk Pucca road ( Abdul Rog Gazibari ) – Kismat Moukaram Pucca road ( Bajlul Houladar Bari) road (ch.00m - 1620m) &Mosque link road 80.00m(b) Construction of 02no 1.50mx1.50m culvert at ch.200m & 1610m on the same road IRIDP-2 patuakhali-s 578955388 1.70 3.00 75.44 M/S. Palli Stores,Pro. Md. Golam Sawrar (Badal) 67.90 25/04/2017 02/05/2018 32 06/05/2019
401 IRIDP-2/PTK/DW-94 Improvement of Itbaria Pukurjana Isahak Ali Jommader to Sathghar bazar via Aziz Molla H/S road (ch.1500m-2000m) ID. No. 578954302 0 0 0 2,357,861.00 2,239,967.95 0 IRIDP-2 patuakhali-s 578954302 0.50 23.57 Mizanur Rahman Manir 22.39 0 06/05/2019
402 IRIDP-2/PTK/DW-132 Improvement of Lohalia Kakarbunia Shahalam Sikder bari -Monir Mollah Dokan road (ch.00-580m) ID. No. 578955405 IRIDP-2 patuakhali-s 578955405 0.58 20.07 Md. Enayet Hossain 19.42 12/07/2017 20/11/2018 30 06/05/2019
403 IRIDP-2/PTK/DW-144 Improvement of Khalishakhali Fatiker Khaya ghat west side Wapda Sluice- west side khalpar, north side Kalu Mredha bari,Munshi bari – north side khalisakhali GPS & H/S roadroad (ch.00m-600m) ID. No.Construction of 1.00mx1.00m Culvert at Ch.375m on the same Road 578954381 IRIDP-2 patuakhali-s 578954381 0.60 1.00 35.75 M/S. Shahin Enterprise 35.75 12/07/2017 30/08/2018 45 06/05/2019
404 IRIDP-2/PTK/SDW-166 a) Improvement of Sreerampur Bazar- kaler hat Bazar via Dhakkin Sreerampur GPS road (Ch.00-1200m)b) Construction of 02no 1.50x1.50m culvert at Ch. 1050m&1200m on the same road. IRIDP-2 patuakhali-s 578954044 1.20 3.00 85.46 Md. Mahafuz Khan 76.92 22/03/2018 28/12/2018 70 06/05/2019
405 IRIDP-2/PTK/SMW-167 (a)Maintenance of Itbaria UPC-Kalichana Bazar via Ghopkhali Bazar road (ch.00m-1750m) ID. No. 578953025(b) Construction of 01no 3.0mx3.0m culvert at ch.800m on the same road(c) Construction of 01no 1.50mx1.50m culvert at ch.930m on the same road IRIDP-2 patuakhali-s 578953025 1.75 4.50 48.12 Md. Mahafuz Khan 43.31 04/06/2018 26/12/2018 10 06/05/2019
406 IRIDP-2/PTK/SDW-181 Improvement of Sreerampur Bazar-Kaler hat Bazar via Dakkhin Sreerampur GPS Road (Ch. 1200m-1750m) ID. No. 578954044 IRIDP-2 patuakhali-s 578954044 0.55 39.27 M/S. Sikder Enterprise 37.31 09/10/2018 16/04/2019 60 06/05/2019
407 IRIDP-2/PTK/DW-183 Improvement of Arshed Molla Barir Mosque – Mojibar Khan Bari via Uzzal dali road (ch.00m-250m) ID. No. 578954424 & Mosque link.133m. IRIDP-2 patuakhali-s 578954424 0.38 20.52 M/S. Bhuyia Construction 19.50 21/01/2019 28/07/2019 0 06/05/2019
408 IRIDP-2/PTK/DW-184 Improvement of Khalishakhali Ferry ghat hat to UZR ( Khalishakhali H/S) road (ch.00m-300m) ID. No. 578955058 IRIDP-2 patuakhali-s 578955058 0.30 20.70 M/S. Abul Kalam Azad 19.67 0 06/05/2019
409 IRIDP-2/PTK/DW-185 Improvement of Chottobeghi Kumarkhali Madrasha to Seraj Ali Akan Bari via Sobahan Mredha bariroad (ch.650m-1000m) ID. No. 578954291 IRIDP-2 patuakhali-s 578954291 0.35 15.89 Mrs. Rahima Traders 15.10 21/01/2019 28/07/2019 15 06/05/2019
410 IRIDP-2/PTK/SDW-169 (a)Improvement of Kachabunia Bazar to Pairakunja bazar road (ch.00m-1023m) ID. No. 578954211(b) Construction of 01no 1.50mx1.50m culvert at ch.940m on the same road IRIDP-2 patuakhali-s 578954211 1.02 1.50 84.27 M/S. M.L. Builders 80.06 09/10/2018 04/02/2019 100 30/04/2019
411 IRIDP-2/PTK/DW-186 (a)Improvement of Kalikapur Bahalgachia Pakar Matha to Akin Holwader bari road (ch.940m-1040m) ID. No. (b) Construction of 01no 3.00mx3.00m culvert at ch.1042m on the same road IRIDP-2 patuakhali-s 578954277 0.10 3.00 19.19 M/S. Akon Enterprise 18.23 17/01/2019 15/02/2019 100 30/04/2019
412 IRIDP-2/PTK/DW-3 (a) Improvement of Patuakhali Ferry gaht - Khalishakhali H/S East side Ghat road (ch.400m-850m) (b)Const. of 3.00mX3.00m culvert at ch.950m on the same road. IRIDP-2 patuakhali-s 578955058 0.45 3.00 23.17 Mizanur Rahman Manir 19.36 29/02/2016 02/08/2016 100 30/04/2019
413 IRIDP-2/PTK/DW-63 Improvement of Nandipara Bridge - Nandipara GPS via Maddya Nandiapara GPS Mativanga bazar road (ch.00m-1150m) IRIDP-2 patuakhali-s 578955172 1.15 35.04 M/S. Kalam Construction 29.07 11/04/2016 02/08/2016 100 29/04/2019
414 IRIDP-2/PTK/DW-66 Improvement of Tangrakhali UNR road – Zilaparisad Dack bangle via Tangrakhali Oij Abad madrasha & Tangrakhali GPS. road (ch.00m-253m) IRIDP-2 patuakhali-s 578954237 0.25 20.07 M/S. Sunrise Construction, Pro. Md. Kamal Hossain 16.49 18/07/2016 24/11/2016 100 29/04/2019
415 IRIDP-2/PTK/DW-67 Improvement of Badarpur Kherunessa Mahila Madrasha – Darber Sharif via Khan Bahadur Bari road (ch.00m-830m) & Link 70.0m IRIDP-2 patuakhali-s 578955341 0.90 43.59 M/S. Jiaul & Brothers, Pro. Khandoker Jiaul Hossain 35.75 31/08/2016 21/03/2018 100 29/04/2019
416 IRIDP-2/PTK/DW-130 Improvement of Charbalaykhati Joynal Abidin mridha – Mia bari Pool (ch.00-735m) IRIDP-2 patuakhali-s 578955125 0.74 24.92 Md. Enayet Hossain 24.21 12/07/2017 18/01/2018 100 29/04/2019
417 IRIDP-2/PTK/DW-131 Improvement of Vhayla Jaynal Khan School-Bishas Bari Via Sholeman Munshi Bari road (ch.00-560m) IRIDP-2 patuakhali-s 578955397 0.56 19.92 Md. Enayet Hossain 19.29 12/07/2017 17/01/2018 100 29/04/2019
418 IRIDP-2/PTK/DW-133 Improvement of Lohalia Up Kartick Pal bari – Miarhat via Anis Sikder bari road (ch.00-1300m) IRIDP-2 patuakhali-s 578954149 1.30 45.85 Md. Enayet Hossain 43.81 12/07/2017 20/12/2018 100 29/04/2019
419 IRIDP-2/PTK/DW-135 Improvement of Auliapur RHD Waresh Sikder bari – Sone Ali Houlader bari via Jalal Mridha Bari road (ch.6600-7000m) IRIDP-2 patuakhali-s 578954398 0.40 21.87 M/S. Kabir Traders 19.69 12/07/2017 05/01/2018 100 29/04/2019
420 IRIDP-2/PTK/DW-136 Improvement of Choddobhuria dhali bari Patabunia bazar road (ch7250-7630m) IRIDP-2 patuakhali-s 578952008 0.42 22.47 Md. Azahar Uddin 21.75 12/07/2017 09/08/2018 100 29/04/2019
421 IRIDP-2/PTK/DW-137 Improvement of Uttar Baduria high School - Amkhola UPC via Shehakati Bazar & Purbo Badura Sr.Madrasha via Alamin Sikder bari .road (ch.6950-7600m) IRIDP-2 patuakhali-s 578953047 0.65 37.28 M/S. Kabir Traders 33.55 13/08/2017 10/01/2018 100 29/04/2019
422 IRIDP-2/PTK/DW-138 Improvement of Tangrakhali Abul Mazid bari – Ansar mredha bari road (ch.00-570m) IRIDP-2 patuakhali-s 578955505 0.57 19.76 Md. Basir Uddin 20.75 10/12/2017 30/03/2018 100 29/04/2019
423 IRIDP-2/PTK/DW-139 Improvement of Pachim Auliapur Fatulah Bazar- Seni Ali Bari via Adersho high school road (ch.00m-570m) IRIDP-2 patuakhali-s 578954251 0.57 19.77 Md. Basir Uddin 19.39 12/07/2017 02/12/2017 100 29/04/2019
424 IRIDP-2/PTK/DW-140 Improvement of Purba Katakhali Sluice road – Au Board School road (ch.00m-570m) ID. IRIDP-2 patuakhali-s 578954249 0.57 19.57 Md. Manebur Rahman 18.99 12/07/2017 04/12/2017 100 29/04/2019
425 IRIDP-2/PTK/DW-141 Improvement of Bahalgachia kolom Gazi bari – Hetalia mosque via kancon munsi bari road (ch.00m-940m) IRIDP-2 patuakhali-s 578954277 0.94 33.26 M/S. Najmus Shahadat Traders 32.96 12/07/2017 15/01/2018 100 29/04/2019
426 IRIDP-2/PTK/DW-142 Improvement of Matibanga Khaleque Sikder bari – Kumarkhali Alia Madrasha (Chottobeghi Kumarkhali Madrasha to Seraj Ali Akan Bari via Sobahan Mredha bari ) road (ch.00m-650m) IRIDP-2 patuakhali-s 578954291 0.65 22.06 Shafiqur Rahman 21.88 12/07/2017 03/05/2018 100 29/04/2019
427 IRIDP-2/PTK/DW-143 Improvement of Maderbunia Up at Nandipara gram Mazaffar chokider bari – Chottb egi Fultala (UZR Nandipara Bridge) to UNR Nandipara GPS road) road(ch.1150-1650m) IRIDP-2 patuakhali-s 578955172 0.68 22.27 Md. Khabir Uddin Mridha 21.19 12/07/2017 15/01/2018 100 29/04/2019
428 IRIDP-2/PTK/DW-145 Improvement of Auliapur UPC-Keshabpur Hat.road (ch.2620-3800m) IRIDP-2 patuakhali-s 578953038 1.18 66.09 M/S. Kabir Traders 59.48 26/07/2017 20/11/2017 100 29/04/2019
429 IRIDP-2/PTK/DW-146 (a)Improvement of Sreerampur Portoniz jadughar Mosque - Lahaj Master bari via Hanif Munsi bari road (ch.220-500m) ID. No.578954383.&Mosque Link -78m(b) Construction of 01no. 2.50mx2.50m culvert at ch.464m on the same road. IRIDP-2 patuakhali-s 578954383 0.36 2.50 21.30 M/S. Najmus Shahadat Traders 19.17 12/07/2017 07/03/2018 100 29/04/2019
430 IRIDP-2/PTK/DW-147 Improvement of Dhakin Dharandi GPS -Mohammadia Hafizia ,Nurani Madrasha road (ch.00-465m) IRIDP-2 patuakhali-s 57895398 0.47 26.57 Md. Manebur Rahman 23.99 12/07/2017 15/01/2018 100 29/04/2019
431 IRIDP-2/PTK/DW-148 Improvement of Dumki Upazila H/Q (Janata Collage) - Moukoron GC (East Karticpasha UZR) via Islamia Dakhil Madrasha.road (ch.00-1920m) IRIDP-2 patuakhali-s 578963013 1.92 91.19 Md. Abdul Halim Mondal 86.95 12/07/2017 22/11/2018 100 29/04/2019
432 IRIDP-2/PTK/DW-151 Improvement of Dhankhali Bazar – Pukurjana bazar Gani sikder bari road (ch.00-450m) IRIDP-2 patuakhali-s 578954135 0.45 16.36 M/S. Palli Stores,Pro. Md. Golam Sawrar (Badal) 17.07 08/11/2017 09/04/2018 100 29/04/2019
433 IRIDP-2/PTK/DW-154 Improvement of Itbaria Pukurjana Isahak Ali Jommader - Sathghar Bazar via Aziz Molla H/S road (Ch.00-1500m) IRIDP-2 patuakhali-s 578954302 1.50 54.41 Md. Basir Uddin 57.15 10/12/2017 15/03/2018 100 29/04/2019
434 IRIDP-2/PTK/DW-1 Improvement of Bottolbunia College- Late Mujafar Chowkider Bari-Late Keramat Ali Howlader Bari road (ch.00m-1100m) 0 IRIDP-2 patuakhali-s 578955179 1.10 36.99 Brothers Treding, Pro. Md. Al-Amin Sikder 32.26 29/02/2016 01/08/2016 100 32.24 28/04/2019
435 IRIDP-2/PTK/DW-2 Improvement of Patuakhali-Barisal R&H (Kader Munshi) Bari - Badarpur Moslem Khan Bari via Hakim Ali Bari. (ch.00m-900m)& Mosque Link road180m IRIDP-2 patuakhali-s 578955156 1.08 35.00 Mizanur Rahman Manir 29.52 25/02/2016 01/06/2018 100 28/04/2019
436 IRIDP-2/PTK/DW-4 Improvement of North Kachisira Motaher Molla Bari - Dakhin Kachisira Hanif Merdha Bari Pul (Dhankhali UNR-Ghopkhali UNR Haji Bari) road (ch.00m-725m. IRIDP-2 patuakhali-s 578954135 0.73 19.93 Brothers Treding, Pro. Md. Al-Amin Sikder 16.56 18/02/2016 02/08/2016 100 28/04/2019
437 IRIDP-2/PTK/DW-5 Improvement of Talikhali Datter Bridge - west Talikhali GPS-Talikhali Dakhil Madrasha & cyclone Shelter ( ch.1000m-1890m.) IRIDP-2 patuakhali-s 578953019 0.89 29.90 izanur Rahman Manir 24.58 29/02/2016 02/08/2016 100 28/04/2019
438 IRIDP-2/PTK/DW-6 Improvement of Pukurjana Anil Das Bari - Ishaque Bari College (Itbaria UPC to Sathghar Bazar) road(ch.00m-740m) IRIDP-2 patuakhali-s 578953026 0.74 24.96 Mizanur Rahman Manir 20.73 25/02/2016 02/08/2016 100 28/04/2019
439 IRIDP-2/PTK/DW-44 Improvement of Sreerampur Bazar (Sreerampur School) UZR – Kalikapur GPS via Moddya Sreerampur GPS road (Ch. 1500-2250m). IRIDP-2 patuakhali-s 578954196 0.75 25.45 Md. Enayet Hossain 25.39 20/03/2016 02/08/2016 100 28/04/2019
440 IRIDP-2/PTK/DW-45 Improvement of Ballabpur Mazibari - Shadia College via GaniChowkider Bari, ballabpur GPS road (Ch. 00-900m). IRIDP-2 patuakhali-s 578954179 0.90 25.19 S.M Trading 23.09 11/04/2016 02/08/2016 100 28/04/2019
441 IRIDP-2/PTK/DW-188 Improvement of South Kajir Howla Rg.P.S - H/o Aliomgier medha road (ch.826m-2300m) ID. No. 578585218 0 0 0 10,920,203.00 21 Jan 2019 10,374,192.85 28 Jul 2019 25 IRIDP-2 Rangabali 578585218 1.47 109.20 M/S. Bhuyia Construction 103.74 21/01/2019 28/07/2019 25 13/05/2019
442 IRIDP-2/PTK/SDW-150 Improvement of Gohinkhali Bazar UZR- Gohinkhali Launch ghat road (Ch.3200m-3450m) & Moktob Link road 00-280m. IRIDP-2 Rangabali 578584231 0.53 47.33 M/S. Palli Stores,Pro. Md. Golam Sawrar (Badal) 46.89 22/07/2017 14/01/2018 100 12/05/2019
443 IRIDP-2/PTK/DW-161 (a)Improvement of Gohin khali C. Shelter-Horidrakhali road (ch.3000m-4400m) ID. No. (b) Construction of 02no 0.625mx0.60m culvert at ch.3430m,4200m on the same road IRIDP-2 Rangabali 578585068 1.40 1.25 156.62 M/S. Kohinoor Enterprise 140.96 29/03/2018 05/04/2019 10 12/05/2019
444 LGED/MDSP/PATU/14-15/NW-05 Construction of 36 nos GPS cum Disaster Shelters with connecting Road. MDSP patuakhali-s 31.32 20814.02 The Civil Engineers Ltd & Nabarun Traders Ltd (JV) 24032.94 09/03/2020 16/06/2020 31/12/2021 14 10/02/2021 Only One Package for entire district covering 8 Upazilas. 9 shelters in Bauphal, 5 shelters in Dashmina, 2 shelters in Dumki, 5 shelters in Galachipa,3 shelters in Kalapara, 3 shelters in Mirzagonj, 5 shelters in Sadar and 4 shelters in Rangabali Upazila.
445 RERMP-3/PA TUA/W-31 Maintenance of Rural Roads Patuakhali () RERMP-3 patuakhali-s N/A 33 2701.00 N/A 2701.00 40 896.00 33 26/12/2021 Ongoing
446 SP14192/Char Roy Shaheb FCD Subproject Char Alji Khal Re-excavation(ch: 0.00-1900 m) Char Kachua Khal Re-excavation(ch: 0.00-650 m) Char Roy Shaherb Embankment Re-sectioning (Ch: 5035 - 13550 m) Reference Lined Section (4 nos.) and SP Identification Signboard (2 nos.) WMCA Office Construction, Electrification Works and Furniture Supply Regulator Repair of Char Kachua Khal -. Regulator Repairs of Dakshin Char Mizan Khal -. Regulator Repairs of Char Alji Khal -. SSSWRDP bauphal   11.06 95 121.99 Presideny:Sohel Rana Secretary:Mahinur 119.36 28/11/2020 23/02/2021 30/04/2021 96 114.14 95 30/11/2022 Ongoing
447 SP43050/Moddah-Purba Rajapur Subproject Shikhol Gara Khal Re-excavation(ch0.00-2500m) Kumar Khali Branch Khal Re-excavation(ch0.00-2100m) Hisbullah Khal Re-excavation(ch0.00-1380m) Dighir Par Khal Re-excavation(ch0.00-900m) Souder Khal Re-excavation(ch0.00-500m) Thakur Bari Khal Re-excavation(ch0.00-500m) Ref. Lined Section 12 Nos. On 6 Khals, And SP Identf. Signboard (2 nos.) Maintenace of WMCA office building - SSSWRDP bauphal   7.88 97 71.29 Shidul rahaman/Farjana 70.93 31/01/2021 26/07/2021 30/04/2022 100 69.03 97 30/11/2022 Completed
448 SP43058/Shabupura Khal Subproject Re-excavation of Fultala Khal-1 (Ch-0+00km to 1+600km) Re-excavation of Fultala Khal-2 (Ch-0+000km to 1+800km) Re-excavation of Fultala Khal-3 (Ch-0+000km to 0+820km) Re-excavation of Fultala Khal-4 (Ch-0+000km to 0+500km) Re-excavation of Uttar Raj Nagar Khal (Ch-0+000km to 1+400km) Re-excavation of Gazi Hota-2 Khal (Ch-0+000km to 1+100km) Ref. Lined Section 13 Nos. On 6 Khals, And SP Identf. Signboard (2 nos.) Rehabilitation of WMCA Office - SSSWRDP bauphal   7.22 100 71.76 MD. KHOKON SHIKDAR 71.27 22/06/2022 25/07/2022 30/04/2022 100 70.90 100 30/11/2022 Completed
449 SP41005/Kanakdia FMD Subproject Re-Sectioning of Kanadia Embankment(Ch.0+000 Km to 7+750 Km) Re-Excavation of Amirabad Khal (Ch.0+000 Km to 2+750 Km) Re-Excavation of Narayanpasha Branch Khal (Ch.0+000 Km to 1+200 Km) Re-Excavation of Dakual Khal (Ch.0+000 Km to 0+600 Km) Const. of 6 Nos. Reference Lined on 3 Khals, SP Identification sign board 2 Nos. and SP Indication Post 2 Nos. SSSWRDP bauphal   12.30 98 111.86 LCS-08 111.86 28/02/2023 05/03/2023 30/05/2023 100 110.11 98 30/11/2022 Completed
450 SP14194/Anarashia FCD Subproject Rehebilitation of 2Nos Regulator (Size 1V-1.50mX1.80m.) at ch. 5680m & ch. 6530m on Meser Khal. Rehebilitation of 3Nos Pipe Sluice (Size 1V-900mm) at ch. 200m on Betaler khal-1, ch.3235m on Betaler khal-2 & ch. 4125m on Meser Khal. Rehebilitation of 1No. Regulator (Size 2V-1.50mX1.50m.) at ch. 200m on Betaler khal-2 Re-excavation of Betaler Khal-2 (Ch-0+000km to 1+950km) Re-excavation of Betaler Khal-1 (Ch-0+000km to 1+650km) Re-excavation of Meser Khal (Ch-0+000km to 0+750km) Re-excavation of Bausar Khal (Ch-0+000km to 0+500km) Re-excavation of Bangar Khal (Ch-0+000km to 0+500km) Ref. Lined Section 8 Nos. On 5 Khals, And SP Identf. Signboard (2 nos.) SSSWRDP bauphal   168.70 95 67.76 M/S Mohiuddin Ahmed 66.64 28/11/2023 20/02/2024 30/04/2024 97 63.34 95 30/11/2022 Ongoing
451 SP15345/Rajapur Patilapara FCD Subproject Rajapur-Patilapara Embankment re-sectioning(ch:0.00 - 1000m and 2700m - 3250m) Rajapur Khal re-excavation (Ch:0.00 - 1600m) Kachabunia Khal re-excavation (Ch:0.00 - 450m) Burir Khal re-excavation (Ch:0.00 - 1700m) Rajapur Branch Khal re-excavation (Ch:0.00 - 1180m) Mahish Barir Khal re-excavation (Ch:0.00 - 1250m) Const. of 09 Nos. Ref. lined Section on 5 Khals, SP Identf. sign board 2, SP Area Indication Post 2 Nos. Rehabilitation of Regula. (1V-1.5m x 1.5) on Burir khal, Rehabilitation of 2Nos Regu. (2V-1.5m x 1.5) on Rajapur Branch & Kalia Barir khal, Rehabi. of 2Nos Regulator (1V-1.5m x 1.5) on Arinow & Patilapara Khal SSSWRDP bauphal   7.73 78 79.46 M/S Mohiuddin Ahmed 78.05 14/11/2023 30/01/2024 30/04/2024 87 61.15 78 30/11/2022 Ongoing
452 SP22027/Dhulia Subproject Dhulia Embankment re-sectioning(ch:350.00 - 2400m, 4870m - 6250m and 11300m - 12790m), Const. SP Identf. sign board 2 Nos. and SP Area Indication Post 2 Nos. Rehabi. of 2Nos Regulator (1v-1.50mx1.50m) on Mondal bari Khal At Ch-12+809Km (emb) and Patuakhali Khal At ch.19+204Km (emb) Rehabi. 1No Regulator (1v-1.50mx1.50m) on Rabaiyer Bazer Khal At Ch-2+850 Maint. of WMCA Office SSSWRDP bauphal   4.92 43 74.99 OTM 74.99 17/01/2024 22 32.54 43 30/11/2022 Ongoing
453 SP61018/Uttar Char Bishwas Subproject Re-exacavation of Annir Khal (Ch-0+00km to 8+568km) Re-excavation of Char Agosthi Khal (Ch-0+00km to 6+215km) Re-excavation of Modon Hawlader Barir Khal (Ch-0+000km to 2+472km) Ref. Lined Section 19 Nos. On 3 Khals, And SP Identf. Signboard (2 nos.) Construction of WMCA office building SSSWRDP galachipa   17.25 96 207.38 M/S Ayan Enterprise 205.65 26/12/2021 27/03/2022 30/04/2022 100 199.26 96 30/11/2022 Completed
454 SP62053/Guabaria Subproject Re-excavation of Paschim Guabaria Khal (Ch.0+000 to Ch. 3+887 km) Re-excavation of Taltalir Khal (Ch. 0+000 to Ch. 2+207 km) Re-excavation of Puraba Guabaria Khal (Ch.0+000 to Ch. 2+002 km) Re-excavation of Lamnar Khal (Ch. 0+000 to Ch. 1+180 km) Const. of 9 Nos. Ref. lined Section, SP Identification Signboard and Post 2 Nos. and Demarcation Post 22 Nos. Construction of WMCA office SSSWRDP galachipa   9.27 85 152.11 Md.Mohibul Islam 149.78 27/03/2023 28/03/2023 30/05/2024 96 128.22 85 30/11/2022 Ongoing
455 SP61013/Dakkhin Amragachhia Subproject Re-excavation Gawatala Char Khal (Ch-0+000km to 0+930km) Re-excavation of Napiter Khal (Ch-0+000km to 1+440km) Re-excavation of Hashemer khal (Ch-0+00km to 0+615km) Re-excavation of Jugir khal (Ch-0+000km to 0+915km) Re-exacavation of Kamarer Khal (Ch-0+000km to 1+374km) Re-excavation of Purbo Awra to Pashim Awra khal (Ch-0+000km to 2+800km) Re-excavation of Uttar Awra Mongoler khal (Ch-0+000km to 2+775km) Ref. Lined Section 13 Nos. On 7 Khals, And SP Identf. Signboard (2 nos.) Construction of WMCA office building Const. of Gawatala Khal Box culvert (2v-3.00mx3.50m) at ch.0+010km | 2023-24 SSSWRDP mirjaganj   10.82 78 135.07 OTM 133.08 22/02/2022 27/03/2022 30/04/2022 90 104.37 78 30/11/2022 Ongoing
456 SP62048/Madhya Amragachia Subproject Re-excavation of Bebajia Khal (Ch. 0+000 to Ch. 3+000 km) Re-excavation of Ruitar Khal (Ch. 0+000 to Ch.1+885 km) Re-excavation of Daser Danga Khal (Ch. 0+000 to Ch. 2+256 km) Re-excavation of Molla Barir Khal (Ch. 0+000 to Ch. 1+550 km) Re-excavation of Thakurer Khal (Ch. 0+000 to Ch. 1+710m) Re-excavation Nizam Alir Khal (Ch. 0+000 to Ch. 2+800m) Const. of 14 Nos. Ref. lined Section, SP Indentification signboard and Post 2 Nos. and Demarcation Post 48 Nos. Construction of WMCA office Construction of Thakurer Khal Box culvert (2v-2.80m x 3.70m) at ch.0+625km | 2023-24 Construction of Ruiter Khal Box culvert (1v-3.5m x 3.70m) at ch.0+400km | 2023-24 Construction of Ruiter Khal Box culvert (1v-3.5m x 3.70m) at ch.1+885km | 2023-24 SSSWRDP mirjaganj   13.20 61 209.04 OTM 206.70 27/03/2023 28/03/2023 30/05/2023 72 126.79 61 30/11/2022 Ongoing
457 SP25210/Deuli-Subidkhali Subproject Golkhali Branch Khal re-xcavation (Ch:0.00m - 3000.00m) 2023-24 Charer Khal re-xcavation (Ch:0.00m - 2300.00m) 2023-24 Const. of 07 Nos. Ref. lined Section on 02 Khals, SP Identf. sign board 2, SP Area Indication Post 2 Nos. | 2023-24 SSSWRDP mirjaganj   5.30 24 48.73 LCS-3 48.73 16/05/2024 10/06/2024 25 12.16 24 30/11/2022 Ongoing
458 SP13103/Hetalia-Madarbunia FCD Subproject Patabunia khal re-excavation(ch.00-2200m) Meser Mollar khal re-excavation(ch.00-1000m) Hetalia embankment re-sectioning(ch.1000-4000m) Referenced line section(4 Nos.) WMCA Office and Others Bamboo bridge(2nos) SSSWRDP patuakhali-s   6.20 100 127.46 Md.Kholil Kazi/Abu Hawlader 126.28 19/03/2019 25/07/2019 30/04/2019 100 125.65 100 30/11/2022 Completed
459 SP13104/Barobigha Mollabari FCD Subproject Embankment Re-Sectioning (Ch: 1320.00m-5500.00 m) SSSWRDP patuakhali-s   4.18 98 84.55 syed Nurul Islam/Md Kobir Uddin 84.55 14/02/2021 27/03/2021 30/04/2021 100 83.45 98 30/11/2022 Completed
460 SP15265/Pairakunja FCD Subproject Embankment Re-exca (Ch: 500 - 3227 m, 5600 - 7100 m and 8800 - 10800 m ) 2 SP Identifying Board Repair of Galachipa Khal Regulator (3 Vent) -. Repair of Durgapur Khal Regulator (2 Vent) -. Repair of Kurir Khal Regulator (2 Vent) -. Repair of Hala BashKhali Khal Pipe Sluice (1 Vent) -. Repair of Golabunia Khal Pipe Sluice (1 Vent) -. Durgpur Khal re-xcavation (Ch:0.00m - 2200.00m) 2023-24 Gilabuni Khal re-xcavation (Ch:0.00m - 2050.00m) 2023-24 Eitbaria Khal re-xcavation (Ch:0.00m - 2000.00m) 2023-24 Lakshmipur Shiri Khali Khal re-xcavation (Ch:0.00m - 1600.00m) 2023-24 Const. of 10 Nos. Ref. lined Section on 04 Khals, SP Area Indication Post 2 Nos. | 2023-24 Cons. of Pipe Sluice (1V- 600m dia at Ch. 9+110 km of Embankment.) & Cons. of Pipe Sluice (1V-600m dia at Ch. 10+800 km of Embankment.) 2023-24 SSSWRDP patuakhali-s   14.07 77 219.19 President:mokbul hossain Secretary:ali akbor mirrida 199.24 28/10/2020 28/12/2020 30/04/2021 60 153.45 77 30/11/2022 Ongoing
461 SP15266/Barabighai DR Subproject Chakar Bari Khal Re-excavation(ch0.00-2500m) Katakhali Khal Re-excavation(ch0.00-1650m) Shadhu Akan Khal Re-excavation(ch0.00-2000m) Shedam Gain Khal Re-excavation(ch0.00-950m) Titkata Khal Re-excavation(ch0.00-1550m) Ref. Lined Section 8 Nos. On 5 Khals, And SP Identf. Signboard (2 nos.) SSSWRDP patuakhali-s   8.65 92 76.16 Sohidul/Nasima 76.16 27/01/2021 27/03/2021 30/04/2021 100 70.72 92 30/11/2022 Completed
462 SP15316/Bhagirabad-Jainkathi FCD Subproject Kalibari khal re-excavation(ch.00-800m) Referenced line section((2 Nos.) Bamboo bridge((1 Nos.) Embankment re-sectioning(ch.00-1800m) SSSWRDP patuakhali-s   2.60 95 51.85 LCS 51.85 25/09/2018 08/01/2019 30/09/2019 100 49.56 95 30/11/2022 Completed
463 SP44143/Hetalia-Ballabhpur Khal Subproject Re-excavation of Hetalia Khal (Ch: 0 m to 2076 m) Re-excavation of Dudhar Khal (Ch: 0 m to 1160 m) Re-excavation of Poshurbunia Khal (Ch: 0 m to 1450 m) Re-excavation of Bausar Khal (Ch: 0 m to 1235 m) Re-excavation of Bahalgachia Khal (Ch: 0 m to 1150 m) Ref line section (5 nos. ) and SP signboard (2 nos.) Charabunia Switch to Miya Bari Ballavpur Khal re-xcavation (Ch:0.00m - 2800.00m) 2023-24 Wazid Bari Katakhali Khal re-xcavation (Ch:0.00m - 2800.00m) 2023-24 Kalam Gazi to Bahalgachiya Bharania Khal re-xcavation (Ch:0.00m - 1800.00m) 2023-24 Const. of 08 Nos. Ref. lined Section on 03 Khals, SP Identf. sign board 2, SP Area Indication Post 2 Nos. | 2023-24 SSSWRDP patuakhali-s   14.47 98 110.01 pesident:Mst.Nur-Jahan Begum Secretary:Md.Yousuf monsi 109.98 31/03/2024 31/03/2024 31/05/2024 100 108.56 98 30/11/2022 Completed
464 SP62050/Saula Subproject Re-excavation of Bhayalar Khal (Ch. 0+000 to Ch. 1+166 km) Re-excavation of Bhuria Khal (Ch. 0+000 to Ch. 2+210 km) Re-excavation of Biler Bari Khal (Ch. 0+000 to Ch. 2+600 km) Re-excavation of Biler Bari Br. Khal (Ch. 0+000 to Ch. 0+387 km) Re-excavation of Boyati Bari Khal (Ch. 0+000 to Ch. 0+880m) Re-excavation of Saula Sikdar Bari Khal (Ch. 0+000 to Ch. 1+160m) Const. of 09 Nos. Ref. Lined Section and SP Identification Signboard Construction of WMCA office SSSWRDP patuakhali-s   8.40 98 159.72 Md.Mohibul Islam 155.87 27/03/2023 28/03/2023 30/05/2023 100 153.93 98 30/11/2022 Completed
465 061/176 Construction of Adabaria UP Complex UCCP-2 bauphal 100 111.60 117.06 24/09/2014 30/12/2015 100 116.33 100 06/09/2020 final
466 060/176 Construction of kanakdia UP Complex UCCP-2 bauphal 111.60 117.06 15/10/2014 30/06/2016 100 06/09/2020 final
467 092/246 Construction of Kalaiya UP Complex UCCP-2 bauphal 100 81.00 85.03 01/06/2011 30/08/2016 100 84.10 100 29/07/2020 final
468 091/246 Construction of Nazirpur-taterkhati UP Complex UCCP-2 bauphal 100 81.00 84.97 01/06/2011 25/06/2015 100 84.43 100 29/07/2020 final
469 093/246 Construction of Dashpara UP Complex UCCP-2 bauphal 100 59.00 55.12 18/12/2008 30/12/2013 100 54.59 100 28/07/2020 final
470 062/176 Construction of BETAGISANKIPUR UP Complex UCCP-2 dashmina 100 120.75 120.75 07/03/2013 06/09/2014 100 120.75 100 06/09/2020 final
471 090/246 Construction of Bashbaria UP Complex UCCP-2 dashmina 100 65.18 65.18 06/02/2010 30/08/2014 100 62.20 100 30/07/2020 final
472 68/176 Construction of charbiswas UP Complex UCCP-2 galachipa 100 122.88 93.50 23/06/2016 30/09/2018 100 93.50 100 06/09/2020 final
473 088/246 Construction of dakua UP Complex UCCP-2 galachipa 100 81.00 87.64 03/06/2010 30/11/2015 100 87.63 100 29/07/2020 final
474 087/246 Construction of panpatti UP Complex UCCP-2 galachipa 0 190.37 185.19 26/08/2019 01/06/2020 10 0.00 0 29/07/2020 ongoing
475 w.464 Construction of dabluganj UP Complex UCCP-2 kalapara 127.28 106.97 20/11/2016 30/08/2018 100 105.00 26/08/2020 scr not submitted
476 086/246 Construction of chakami UP Complex UCCP-2 kalapara 100 81.00 96.02 30/09/2010 20/12/2014 100 95.85 100 28/07/2020 final
477 085/246 Construction of dhankali UP Complex UCCP-2 kalapara 100 81.00 84.85 26/09/2010 30/09/2015 100 84.29 100 28/07/2020 final
478 084/246 Construction of Kalaiya UP Complex UCCP-2 kalapara 100 81.00 95.69 26/09/2010 30/06/2015 100 95.51 100 28/07/2020 final
479 083/246 Construction of nilgonj UP Complex UCCP-2 kalapara 100 81.00 84.88 26/09/2010 30/06/2015 100 84.44 100 28/07/2020 final
480 082/246 Construction of tiakhali UP Complex UCCP-2 kalapara 100 81.00 84.80 29/09/2010 31/12/2014 100 84.07 100 28/07/2020 final
481 080/246 Construction of badarpur UP Complex UCCP-2 patuakhali-s 100 81.00 84.89 19/01/2011 29/05/2016 100 84.48 100 28/07/2020 final
482 081/246 Construction of barobeghai UP Complex UCCP-2 patuakhali-s 100 81.00 84.99 30/05/2011 29/05/2016 100 84.97 100 28/07/2020 final
483 079/246 Construction of Kalaiya UP Complex UCCP-2 patuakhali-s 100 81.00 84.33 19/01/2011 25/03/2016 100 84.80 100 28/07/2020 final
484 078/246 Construction of kalikapur UP Complex UCCP-2 patuakhali-s 100 81.00 84.99 19/01/2011 25/03/2016 100 84.97 100 28/07/2020 final
485 066/176 Construction of barobaisdia UP Complex UCCP-2 Rangabali 100 81.00 80.90 21/09/2010 30/12/2014 100 80.47 100 06/09/2020 final
486 065/176 Construction of rangabali up (remaining) complex UCCP-2 Rangabali 100 92.28 73.26 12/06/2017 13/05/2018 100 73.21 100 06/09/2020 final
487 089/246 Construction of charmontaj UP Complex UCCP-2 Rangabali 100 81.00 86.03 15/09/2010 12/05/2016 100 86.03 100 28/07/2020 final
488 CBU-100/ Purto-225 পটুয়াখালী জেলার বাউফল উপজেলাধীন জয়বাংলা বাজার সড়ক থেকে পাকডাল হাই স্কুল এবং টেকনিক্যাল কলেজ সড়কে ১৬৫০ মিটার চেইনেজে ব্রিজ নির্মাণ রোড আইডিঃ ৫৭৮৩৮৪২৯৩) UHBP bauphal 578384293 24.00 0 253.26 M/S. Shampa Construction-Md. Enayet Hossain(JV) 193.35 25/04/2021 01/05/2022 11/01/2023 95 158.01 0 28/06/2024  
489 CBU-100/ Purto-227 পটুয়াখালী জেলার দশমীনা উপজেলাধীন দশমিনা মোল্লারহাট UNR সড়কে বামনি দোকান হইতে UZR তহমিল অফিস সড়কে নলখোলা বাজার ১৬৪ মি. চেইনেজে ব্রিজ নির্মাণ (রোড আইডিঃ ৫৭৮৫২৫২৪৪) UHBP dashmina 578525244 24.00 0 270.91 M/S. Shampa Construction-Md. Enayet Hossain(JV) 208.16 25/04/2021 01/05/2022 31/08/2023 100 195.58 0 28/06/2024  
490 CBU-100/ Purto-230 পটুয়াখালী জেলার দুমকি উপজেলার মুরাদিয়া ইউপিসি-লাউকাঠি সড়কে ৭৭০০মি. চেইনেজে শ্রীরামপুর খালের উপর লাউকাঠি-শ্রীরামপুর সড়কের সংযোগ সেতু নির্মাণ (রোড আইডিঃ ৫৭৮৯৬৩০১৫) UHBP dumki 578963015 45.00 0 561.51 M/S. Mohiuddin Ahmed 505.36 06/04/2022 12/04/2023 30/12/2024 90 453.45 0 28/06/2024  
491 CBU-100/ Purto-228 পটুয়াখালি জেলার গলাচিপা উপজেলাধীন কোটখালী বাজার রোড খেয়াঘাট-আব্দুল বারেক মিয়া (এম.পি) বাড়ীর সামনে ঘাট রোডে ব্রিজ নির্মাণ। (রোড আইডিঃ ৫৭৮৫৭৫০২৪) UHBP galachipa 578575024 60.00 0 590.66 M/S. Shampa Construction-Md. Enayet Hossain(JV) 464.36 25/04/2021 01/05/2022 30/06/2023 97 439.96 0 28/06/2024  
492 CBU-100/ Purto-423 পটুয়াখালী জেলার গলাচিপা উপজেলাধীন বকুলবাড়ীয়া ইউনিয়নের লামনা বড় বাজারস্থ খালে ০০মিটার চেইনেজে (রোড আইডি-৫৭৮৫৭৪১৪০) সেতু নির্মাণ। UHBP galachipa 578574140 36.00 0 397.37 M/S.Abul Kalam Azad 351.63 02/03/2022 26/03/2023 15/11/2024 85 272.87 0 28/06/2024  
493 CBU-100/ Purto-231 পটুয়াখালী জেলার সদর উপজেলাধীন তাফালবাড়ীয়া দেলোওয়ার মুন্সীর বাড়ী - বরুলবাড়ীয়া ফুলনেছা জিপি এস ভায়া হাজী কোব্বাত আলী খান বাড়ী সড়কে ৪০০ মিটার চেইনেজে হাজী কোব্বাত আলী খান বাড়ী এর পূর্ব পাশে খালের উপর সেতু নির্মাণ (রোড আইডিঃ ৫৭৮৯৫৪৪১১) UHBP patuakhali-s 578954411 30.00 0 271.54 EFTE.ETCL(Pvt.) Ltd. Horinpala, Bhandaria, Pirojpur. 244.38 03/07/2022 06/07/2023 25/10/2024 55 119.15 0 28/06/2024  
494 CBU-100/ Purto-232 পটুয়াখালী জেলার সদর উপজেলাধীন মরিচবুনিয়া ইউনিয়নে নারিকেলতলা খালের উপর ২৭৫০ মিটার চেইনেজে সেতু নির্মাণ। (রোড আইডিঃ ৫৭৮৯৫৩০৩২) UHBP patuakhali-s 578953032 66.00 0 691.01 Mohammed Eunus & Brothers(Pvt.) Ltd 621.91 03/07/2022 09/07/2023 30/04/2025 65 303.18 0 28/06/2024  
495 CBU-100/ Purto-229 পটুয়াখালী জেলার রাংগাবালী উপজেলাধীন মতিয়ার রহমান হাউস- চরমার্গারেট সড়কে ৩০০ মিটার চেইনেজে সেতু নির্মাণ (রোড আইডিঃ ৫৭৮৫৮৪০৭২) UHBP Rangabali 578584072 66.00 0 595.73 EFTE.ETCL(Pvt.) Ltd. Horinpala, Bhandaria, Pirojpur. 609.92 22/06/2022 28/06/2023 30/06/2024 100 609.70 0 28/06/2024  
496 UIIP-BC/PCO/W-221 A) Contruction of Earth filling & HBB Sarak ward no.-01 Bangabandhu Sarak to ward no.-03 al Modina Jame Mosque via Abdus Samad Jame Mosque under Bauphal Paurosava, District-Patuakhali. Ch. 0.00-1067m. B) Contruction of RCC Road & Drain from Saha Para existing Drain to Paurosava Bhaban via Councilor Miss Rina Begum House in ward no.-03 under under Bauphal Pourosava, District-Patakhali. Ch.0.00-182m. C). Construction of RCC Culvert front side of Md. Zakir Surveyer House ward no.-03 under Bauphal Paurosava, District-Patuakhali UIIP bauphal 1.25 1.00 100 109.72 Md. Abul Kalam Azad 108.54 13/12/2020 30/05/2022 100 108.31 100 08/10/2024
497 UIIP-BC/PCO/W-427 A) Construction of RCC Drain front side of master Monir Existing RCC Drain to East side of Haji Golam Mostofa House under BauphalPaurashava in ward No.-08. Ch.0.00-281.00m. B) Construction of Muslimpara RCC road from R&H Road to Pauro Bhabon at ward No.-03 under Bauphal Paurashava. Ch.0.00-492m. C) Construction of RCC road from Sher-E-Bangla Sarak to Chan Mia House at word No.-07 under Bauphal Paurashava. Ch.0.00-64.00m. UIIP bauphal 0.56 0.00 100 147.22 M/S Arman Builders & Rupali Construction 161.52 23/02/2022 03/02/2022 22/02/2023 100 161.24 100 08/10/2024
498 UIIP-BC/PCO/W-428 A) Improvement of Carpating Sarak From R&H road to Jommader Bari (Janata Sarak) Ch.0.00-2000.00m at ward No-03 under BauphalPaurashava. B) Construction of BC road from Muslimpara Poura Bhaban Front side to Fredom Fighter Wayadut Mia Sarak Via Basur Bari in ward No.-03 Under Bauphal Paurashava.Ch.0.00-1400.00m & With 02 Nos Box Culvert. C) Construction of RCC Culvert on Muslimpara BC Sarak front side of Dr. Ramij Uddin Bari in ward No.-05 under Bauphal Paurashava. D) Construction of RCC Box Culvert on Muslimpara Sarak Near Bot tola in ward No.-03 under Bauphal Paurashava. at Ch.80m. UIIP bauphal 3.40 5.00 100 190.91 M/S SH Etnr. & Shupty Cons. 208.12 10/02/2021 10/02/2021 09/02/2022 100 207.86 100 08/10/2024
499 UIIP-BC/PCO/W-558 (A). Construction of RCC Road Bangla Bazer to Napter Khal Via Mohila Collage Bridge Approch end side (Mohila Collage Road) under Bauphal Paurashava in ward No-08. Ch.000-562m) (B). Construction of RCC Road Napiter Khal Culvert road end point to Jor poll RCC Road in ward No-08. Ch.960.00-1128.00=168m). (C).Construction of RCC Drain Md. Mahadi House Back side to South side Mrs. Rakha Begum front side via Khalil Bari at ward no.09 Under Bauphal Paurashava, Patuakhali. (Ch.000-548.00m). UIIP bauphal 0.73 100 211.26 M/S Arman Builders & Rupali Construction 211.01 02/02/2023 02/02/2023 01/02/2024 100 206.71 100 08/10/2024
500 UIIP-BC/PCO/W-559 A) Improvement of BC Road from R&H road to South side of Poura end area (Sher-E-Bangla Road) in ward no. 07 ( Ch:0.00-885.00m) under Bauphal Paurashava, Patuakhali. B) Improvement of BC Road from Shre-E-Bangla road to Md. Yousuf Sarder Bari (Bangla Link Sarak) in ward no. 06 ( Ch:0.00-500.00m) under Bauphal Pourashava, Patuakhali C) Improvement of BC Road from R&H road to North Side Bangla Bazer Bridge under Bauphal Paurashava in ward no. 07 ( Ch:0.00-173.00m) under Bauphal Pourashava, Patuakhali D) Construction of RCC Road from Dr. Momin Sarak to Md. Aziz Member Bari via Daspara Dakhil Madrasha in ward no. 09 ( Ch:360.00-512.00m=152.00m) and Link road of Aziz Membar Bari ( Ch:0.00-16.50m) under Bauphal Paurashava, Patuakhali . UIIP bauphal 1.73 100 127.77 DEEP-SAHINOOR (JV) 127.52 23/04/2023 30/04/2023 29/04/2024 100 125.49 100 08/10/2024
501 UIIP-BC/PCO/W-552 (a). Construction of shed for public transport Passenger (28.00 spm) at Bauphal Poura Tempu Stand Near H/Q Eng. Faraque North Side od RHD Under Bauphal Pourashava, Patuakhali. (b). Construction of single storied public Toilet (Type-A) near poraton Samaj kallan Gano Milonatan Under Bauphal Pourashava, Patuakhali UIIP bauphal 0 55.68 M/S Mahatab Enterprise 55.47 15/02/2024 25/02/2024 14/02/2025 22 0.00 0 08/10/2024
502 UIIP-BC/PCO/W-579 (A). Construction of RCC Road from R&H Road to Qazi Nazrul Islam Saroni Via College Mosque (ch.0.00-250.00m) at ward no-03 Under Bauphal Pourashava, Patuakhali. (B). Improvement of Carpating Road R&H to Bauphal-Patuakhali BC Sarak Via Jommadder Bari (Janata Road) (ch.1096.00-1963.00=867.00m) at ward no-03 Under Bauphal Paurashava, Patuakhali. "(C). Improvement of Carpating Road from MB Bridge East side slope of Bauphal -Dhandi BC Sarok ( ch.275.00 + 283 .00m+152.00m=710.00m) at ward no-08 Under Bauphal Paurashava, Patuakhali." (D). Improvement of Carpating road from Nurul Haq Master house to Noni Mistre Bari Via Salaheya Dinia Complex Madrasha at ward no-06 (ch.0.00-470.00m) Under Bauphal Paurashava, Patuakhali. UIIP bauphal 2.30 30 274.97 M/S Shupty Arman-Mahabub (JV) Swapnil 274.78 05/02/2024 15/02/2024 04/02/2025 67 82.62 30 08/10/2024
503 UIIP/PCO/G-37 Implementation & Supply 765 nos Waste Basket (120 ltr) & 10 nos Non-motorized vehicle (van) under Bauphal Pourashava District: Patuakhali. UIIP bauphal 0 39.97 RFL Plastrics Limited 25.26 0 0.00 0 08/10/2024
504 UIIP-BC/PCO/W-130 (a) Contruction of Earth filling & HBB Sarak…… Ch.000-518m (b) Contruction of Earth filling & HBB Sarak……… Ch.000-548m (c) Construction of RCC Sarak………. Ch.000-225m UIIP bauphal   1.29 0.00 63 92.79 M/s Hasan Construction & Shupty Construction (JB) 91.85 14/12/2020 14/12/2020 30/05/2022 100 58.43 63 29/09/2022 1.01% Less Land Problem for the Scheme No. (b) under this Package
505 UIIP-BC/PCO/W-131 (a) Contruction of Earth filling & HBB Sarak…… Ch.000-670m (b) Contruction of Earth filling & HBB Sarak…… Ch.000-396m UIIP bauphal   1.07 0.00 100 83.10 M/S Arman Builders 81.85 14/12/2020 14/12/2020 30/05/2022 100 81.85 100 29/09/2022 1.50% Less (Time Extended)
506 UIIP-BC/PCO/W-132 (A). Construction of RCC Drain Dr. Abul Kalam Farmacy front side of Bauphal khal in ward-04, under Bauphal Pauroshava, District: Patuakhali. ch.000-170m. (B). Construction of RCC Drain Md. Sultan Ahammad House to North side of Bauphal Khal via Abdul Khalek Police, Md. Sultan Gazi, Jebon Kormokar in ward-03, under Bauphal Paurosova, District: Patuakhali ch. 000-290 UIIP bauphal   0.00 100 80.62 Md. Iqbal Hossain 70.00 01/09/2020 07/09/2020 06/09/2021 100 69.98 100 29/09/2022 13.17% Less
507 UIIP-BC/PCO/W-222 Construction of RCC Road & Drain from Romijuddin Sarak to Md. Mannan Khan House ward no.-03 under Bauphal Paurosava, District Patuakhali. Ch. 0.00-475m. UIIP bauphal   0.46 0.00 100 105.21 Md. Jamal Hossain 103.64 13/12/2020 19/12/2021 100 103.60 100 29/09/2022 1.50% Less
508 UIIP-BC/PCO/W-272 (a). Construction of BC Sarak Noni Mistary Bari to Md. yousuf Sarder Bari in ward-06, under Bauphal Paurashava, District: Patuakhali. Ch.000-580m (b). Construction of Hisbullah BC Sarak from yousuf Sarder Bari via Alom Sikder Bari more in ward-06, under Bauphal Paurashava, District: Patuakhali. Ch.000-314m (c). Construction of BC Sarak from Darun Sunna Sarak to front side of sikder Bari (Bakultala Sarak) in ward-o7, under Bauphal Paurashava, District: Patuakhali. Ch.000-520m (d). Construction of BC Sarak Dr, momin Sarak to 5ha-E-Bangla Sarak (Assai Sarak) in ward09, under Bauphal Paurashava, District: Patuakhali. Ch.000-488m. UIIP bauphal   1.90 0.00 100 106.56 M/s Sh Enterprise & Shupty Construction (JB) 105.41 12/04/2021 12/04/2021 11/04/2022 100 105.25 100 29/09/2022 1.08% Less
509 UIIP-BC/PCO/W-273 (a). Construction of RCC Drain Girl School more to Kali Bari Existing Drain via Sakender pesker, Councilor Kabir, Jarnalist Shohag in ward No-04, under Bauphal Paurashava, District: Patuakhali. Ch.000-415m (b). Construction of RCC Drain & road R&H sarak to Santh Bag Md, Balayet Kanongo Back side Existing RCC Drain via Rngr. Jafor House in ward No07, under Eauphal Paurashava, District: Patuakhali. Ch.000-177m UIIP bauphal   0.00 100 121.85 M/S Roza & Saom Enterprise - M/S Sawda Enterprise (JV) 121.14 12/04/2021 12/11/2021 12/04/2022 100 121.11 100 29/09/2022 0.58% Less
510 UIIP-BC/PCO/W-274 (a). Construction of RCC Digital Sarak to Fakir Bari via A Razzak Fokir, Mulai Fakir, & Athar Gazi in ward-O9, under Bauphal Pauroshava, District: Patuakhali. Ch.000-219m (b). Construction of RCC Sarak Chairpara Existing RCC road to fredonm fighter AKM khalak mia house in ward -09, under Bauphal Pauroshava, District: Patuakhali. Ch.000-107m. (c). Construction of RCC Sarak Nazirpur Board School Sarak to Ponchiyed Bari in ward-08, under Bauphal Pauroshava, District: Patuakhali. Ch.000-275m. (d). Construction of RCC Sarak Nazirpur Board School to Mirda Bari in ward no-08 under Bauphal Pauroshava, District: Patuakhali. Ch.000-141m (e). Construction of RCC Sarak Kazi Nazrul lslam Saroni Baitul Hamed lame Mosque to Gopal Sill front side Existing RCC road (Sill Para Sarak) via Madop Mondol Bari in ward-03, under Bauphal Pauroshava, District: Patuakhali. Ch.000-348m UIIP bauphal   1.09 0.00 100 127.60 M/S Deip Enterprise 127.08 12/04/2021 12/04/2021 11/04/2022 100 126.85 100 29/09/2022 0.41% Less
511 UIIP-BC/PCO/W-528 A) Construction of Shed for Public Transport Passenger (28.00sqm) at ward No.01 Under Kalapara's Pourashava. B) Construction of One Storied Public Toilet (Type A=56.00sqm) at ward No.02 Under Kalapara's Pourashava. C) Construction of One Storied Vegetables & Agricultural Product Market of 5 Storied Foundation (Floor Area=314 sqm) at ward No.02 Under Kalapara's Pourashava. UIIP kalapara 0.00 100 198.83 ATC-KCD (JV) 167.23 07/07/2022 13/07/2022 12/07/2023 100 162.42 100 09/10/2024 15.89% Less
512 UIIP-BC/PCO/W-538 Construction of Parks and Playgrounds under Kalapara Pourashava. Dist. Patuakhali, (Boundary Wall -117.000m , Surface Drain -131.40m , Footpath-131.40, Gate-02no, Ticket Conner -01no , Food Coner -01 no, Toilet-01 no and Bench-15Nos). UIIP kalapara 100 124.01 M/S Mahmud Kamal, South Sabujbagh, Patuakhali 99.94 14/09/2022 21/09/2022 13/09/2023 100 98.22 100 09/10/2024
513 UIIP-BC/PCO/W-567 Improvement of BC Road from Fery Ghat Chowrasta to Shantibagh Road at Ward No: 01, 02 & 06 Under Kalapara Pourashava , District: Patuakhali(Ch. 0.00-1000m) UIIP kalapara 1.00 100 92.44 MZH-ST (JV) 92.37 02/08/2023 09/08/2023 01/08/2024 100 92.33 100 09/10/2024
514 UIIP-BC/PCO/W-560 Construction of Road by RCC, Starting from RHD Road to Sayed Uddin Super Market via Dak-Bangla Road via Sheikh Kamal Auditorium via Mohila College at Ward No-01 & 02 Under Kalapara Pourahava, Dist: Patuakhali (Ch. 0.00m to 215.00m & 363.00m to 906.00m) Total Length- 758.00m UIIP kalapara 0.76 100 134.05 MD. Kamal Hossain 133.57 18/07/2023 25/07/2023 23/04/2024 100 133.35 100 09/10/2024
515 UIIP-BC/PCO/W-561 A) Construction of RCC Road Starting from WAPDA Road to Sobahan Sikder Model Academy Road at Ward No-09 Under Kalapara Pourahava, Dist: Patuakhali (Ch. 0.00m to 189.00m) B) (i) Construction of RCC Drain Starting from WAPDA Road Adv. Abdur Rob House via Jahangir Mridha House via Abdul Awal Shannomot to Ferdous Matubbar House at Ward No-08 Under Kalapara Pourahava, Dist: Patuakhali (Ch. 0.00m to 235.00m) (ii) Construction of RCC Drain Starting from Kalapara Thana to Press Club at Ward No-02 Under Kalapara Pourahava, (Ch. 0.00m to 85.00m) UIIP kalapara 0.19 100 105.66 AT_JAKIR 104.96 18/07/2023 25/07/2023 25/07/2024 100 91.90 100 09/10/2024
516 UIIP/PCO/G-40 Implementation & Supply 863 nos Waste Basket (120 ltr) & 4 nos Non-motorized vehicle (van) under Kalapara Pourashava District: Patuakhali. UIIP kalapara 0 39.98 RFL Plastrics Limited 27.43 08/02/2024 09/02/2024 08/06/2024 0 0.00 0 09/10/2024
517 UIIP-BC/PCO/W-18 Improvement of Soling & Earthen Road by the BC from Toyeb Member house to Mahabub Talukder Sarak Ch.0+00m0+520m = 520.00m at Ward No-08 Under Kalapara's/ Kuakata Pourashava Patuakhali. (Salvage Cost Tk.103664.00) UIIP kalapara 0.52 0.00 100 85.80 M/S Palli Store 83.47 01/10/2020 07/10/2020 31/05/2024 100 73.87 100 08/10/2024 2.71% Less Progress is less due to negligence of the assigned Contractor
518 UIIP-BC/PCO/W-170 1 Improvement of Earthen Road by the BC from Rahman Kha Mosque To Culvert of Rustum Musully Ch.00 m-690m at Ward No-01 Under Kalapara's/ Kuakata Pourashava. Patuakhali. 2. Construction of 01one Nos of 1-Vent RCC Box Culvart 1.50m x1.80m at Ch- 690m at Ward No -01 Under Kalapara's/ Kuakata Pourashava Patuakhali UIIP kalapara 0.69 1.50 100 125.73 M/S Palli Store 111.54 05/01/2021 05/01/2021 31/05/2024 100 110.09 100 08/10/2024 11.29% Less Work delay because of material carrying problem
519 UIIP-BC/PCO/W-171 1.Improvement of Earthen Road by the BC from the house of Jabber Chawdarys Culvert to Wapda Very Bandth Ch.690m - Ch. 1300m = 610 m at Ward No -01 Under Kalapara's/ Kuakata Pourashava Patuakhali. 2.Construction of UIIP/BC/PCO/W-17201one Nos of 1-Vent RCC Box Culvart 1.50m x1.80mat Ch-1085.00m at Ward No -01 Under Kalapara's/ Kuakata Pourashava Patuakhali. 3. Construction of 01one Nos X-Drain 0.750x1.80m at Ch1147.00m Ward No -01 Under Kalapara's/ Kuakata Pourashava. UIIP kalapara 0.61 1.50 100 124.65 M/S Palli Store 110.21 05/01/2021 05/01/2021 31/05/2024 100 109.07 100 08/10/2024 11.58% Less Work delay because of material carrying problem
520 UIIP-BC/PCO/W-172 1. Improvement of Soling & Earthen Road by the BC from Monir Shorif house to Asrayan 03 Three Road More Ch.000m0730m730.00m at Ward No-03 Under Kalapara's/ Kuakata Pourashav Patuakhali. 2. Construction of 01 One Nos of 1-Vent RCC Box Culvart 2.00m x2.50m at Ch-390m Under Kalapara's/ Kuakata Pourashava Patuakhali UIIP kalapara 0.73 2.00 100 137.31 M/S Palli Store 131.14 05/01/2021 05/01/2021 31/05/2024 100 129.09 100 08/10/2024 4.50% Less Work delay because of material carrying problem
521 UIIP-BC/PCO/W-396 Improvement of Earthen Road by the BC from the House of Jabber Chawdary’s Culvert to Wapda Very Bandth at ward No-01, Under Kalapara's/ Kuakata Pourashava. (Ch-1+300m-1+965m) UIIP kalapara 0.67 0.00 100 114.18 M/S Delowar Hossain 97.94 03/03/2022 08/03/2022 07/03/2023 100 97.72 100 08/10/2024 11.29% less
522 UIIP-BC/PCO/W-397 Construction of RCC Road Starting From 03 no. ward Main BC Road (LGED Rest House West Side) to Shohed Nurujjaman Sorok (Via Elish Park).Ward No-07, Under Kalapara's/ Kuakata Pourashava. (Ch.0+000-0+380m) UIIP kalapara 0.38 0.00 100 104.09 Rezwanul Maksud 87.88 03/03/2022 08/03/2022 30/04/2024 100 83.46 100 08/10/2024 15.58% less
523 UIIP-BC/PCO/W-398 A) Construction of RCC Drain Work starting from 80 Ghare Area, Ward No.01, Under Kalapara's/ Kuakata Pourashava. (Ch:0+000-0+572.00m) UIIP kalapara 0.00 100 51.90 M/S Mayer Doya Enterprise 43.59 03/03/2022 08/03/2022 07/03/2023 100 43.54 100 08/10/2024 16.02% Less
524 UIIP-BC/PCO/W-399 Construction of RCC Drain Work Starting from 03 no. Ward Main BC Road (LGED Rest House West Side) to Shohed Nurujjaman Sorok, (Via Elish Park), Under Kalapara's/ Kuakata Pourashava. (Ch-0+000-0+985.00m) UIIP kalapara 0.00 80 177.42 M/S Libati Traders & Rezwanul Masud (JV) 141.40 03/03/2022 08/03/2022 07/03/2023 100 113.11 80 08/10/2024 20.30% Less
525 UIIP-BC/PCO/W-400 A) Construction of RCC Box Culvert (2x4.00mx3.00m) near at Taher Khan Jame Mosque in Asriaon Ward No. 04, Under Kalapara's/ Kuakata Pourashava. B) Construction of RCC Box Culvert (1x4.30mx3.00m) near at Mr.Kalam & Mr. Afjal house Side Nabinpur Khal in Word No-06, Under Kalapara's/ Kuakata Pourashava. UIIP kalapara 8.30 100 71.64 M/S Bakshi Enterprise 60.58 03/03/2021 04/03/2021 05/03/2022 100 60.22 100 08/10/2024 15.44% Less
526 UIIP-BC/PCO/W-521 A) Improvement of BC Road from Nilonjona Road (Faraje Bari Mosque) to Anchar Camp (Very Bandth) (Ch:0.00-265.00m) Ward No.-07, Under Kuakata Pourashava, Kalapara, Patuakhali. B) Construction of 01 Nos X-Culvert (Size 1.35mX1.80m) of BC Road from Nilonjona Road (Faraje Bari Mosque) to Anchar Camp (Very Bandth) at Ch:180m, Ward No.-07, Under Kuakata Pourashava, Kalapara, Patuakhali.(dropped) C) Improvement of Earthen Road by BC from Mala Para 02 No. Ward BC Road To Sorifpur Primary School West side 01 No. Ward BC Road, (via Habib Soref house), (Ch:0.00-290.00m), Ward No-01, Under Kuakata Pourashava, Kalapara, Patuakhali. D) Construction of 01-Vent RCC Box Culvert (Size: 2.00m x2.50m) of Mala Para 02 No. Ward BC Road To Sorifpur Primary School West side 01 No. Ward BC Road, (via Habib Soref house) at Ch:150m, Ward No -01, Under Kuakata Pourashava, Kalapara, Patuakhali. E) Construction of RCC Drain starting from 07 No Ward Rakin Market Field No LGED Training Center (Councilor Asraf Sikder House Front Road Side), (Ch.0.00-200.00m), Ward No.-07, Under Kuakata Pourashava, Kalapara, Patuakhali. UIIP kalapara 0.67 2.00 88 150.38 M/S Najmus Shahadat Traders, Patuakhali 142.04 16/11/2022 23/11/2022 31/05/2024 100 125.50 88 08/10/2024
527 UIIP-BC/PCO/W-522 A) Construction of Shed for Public Transport Passenger (28.00sqm) at Kuakata Bus Terminal Front Side Under Kuakata Pourashava. B) Construction of One Storied Public Toilet (Type A=56.00sqm) at North Panjupara, ward No.08 Under Kuakata Pourashava. UIIP kalapara 79 47.33 M/S Mamun Construction 44.59 16/11/2022 23/11/2022 15/11/2023 100 35.40 79 08/10/2024
528 UIIP/PCO/G-38 Implementation & Supply 500 nos Waste Basket (120 ltr) & 25 nos Non-motorized vehicle (van) under Kuakata Pourashava District: Patuakhali. UIIP kalapara 0 39.09 RFL Plastrics Limited 30.00 0 0.00 0 08/10/2024
529 UIIP-BC/PCO/W-19 1) Improvement of Earthen Road by the BC from Panju Para More To End of Pourashava Area Ch. 2+000m-2+760m = 760m at Ward No-08. Under Kalapara's/ Kuakata Pourashava.Patuakhali. 2) Construction of 01 One No of 1-Vent RCC Box Culvert 1.50mx1.80m Ch.2+00m-2+300m at Ward No-08 Under Kalapara's/ Kuakata Pourashava Patuakhali UIIP kalapara   0.76 1.50 68 148.31 M/S Mamun Construction 131.53 01/10/2020 07/10/2020 17/12/2021 100 89.73 68 29/09/2022 11.28% Less Final bill to be submitted
530 UIIP-BC/PCO/W-93 (a) Improvement of road by rigid pavement from Madrasha road via Altaf Mia house to Rafique mia house at ward No.-07 under Kalapara's Pourashava. Ch. 0.00 to 640.00m. (b) Improvement of road by rigid pavement starting from west side Nur-E Jame Masjed Nesaria Sarak to Sohel Mia house at ward No.-09 under Kalapara's Pourashava. Ch. 0.00 to 513.00m. UIIP kalapara   1.15 0.00 68 146.81 M/S TM Enterprise 125.98 22/09/2020 29/09/2020 28/09/2021 100 86.29 68 29/09/2022 14.19% Less
531 UIIP-BC/PCO/W-94 (a) Improvement of RCC road starting from behind Girls school to Adom Ali Master house at ward No.-04 Under Kalapara's Pourashava. Ch. 0.00-230.00m (b) Improvement of RCC road starting from Kumar Potti road via Naya potti Oilmill Mosjid at ward No.-06 Under Kalapara's Pourashava. Ch. 0.00-240.00m. (c) Improvement of RCC road starting from Pizus Kanti house via Kishor Vender house to Kobi Nazrul Islam road at ward No.-03 Under Kalapara's Pourashava. Ch. 0.00-340.00m. (d) Construction of road by rigid pavement from Uttam Karmoker house via Akhrabari to Vojohori Kundo at ward No.-06 Under Kalapara's Pourashava. Ch. 0.00-320.00m. UIIP kalapara   1.13 0.00 100 98.24 M/S Bokshi Enterprise 87.82 08/09/2020 15/09/2020 20/09/2021 100 87.81 100 29/09/2022 10.61% Less
532 UIIP-BC/PCO/W-267 (a) (A) Implementation of Road by RCC work from WAODA road Boro Callbari via Kallbari Box Culvert to Fire Service road at ward no- 01 under Kalapara's Pourosava. Ch. 0+000 to 0+930m UIIP kalapara   0.93 0.00 100 113.12 M/S Rupali Construction & Rup Store JV 92.93 10/01/2021 11/01/2021 09/01/2022 100 92.86 100 29/09/2022 17.85% Less
533 UIIP-BC/PCO/W-268 (a) Construction of RCC Road starting from WAPDA Road to Dak Bangla at ward no.-02 under Kalapara's Pourosava. Ch. 0+150m (b) Improvement of road by RCC work from WAPDA Road via Hamid Munshi house to Kumar Patti road at ward no.-06 under Kalapara's Pourosava. Ch. 0+150m. (c) Improvement of road by RCC work from East side of Sukh ranjan house to Rakha Chandi Khola at ward no.-05 under Kalapara's Pourosava. Ch. 0+150m. (d) Improvement of road by RCC work in Golab Bagh road at ward no.-03 under Kalapara's Pourosava. Ch. 0+200m. (e) Construction of RCC Road starting from Kabi Nazrul Islam Road via Army Khalek Mia house to Razzak Miah House at ward no.-03 under Kalapara's Pourosava. Ch. 0+120m UIIP kalapara   0.77 0.00 100 97.11 ATC_ NUR, Puran Bazar, Patuakhali 81.00 10/01/2021 11/01/2021 09/01/2022 100 80.89 100 29/09/2022 16.59% Less
534 UIIP-BC/PCO/W-269 (a) Improvement of road by Rigid Pavement starting from Ukil Patti road via Kacha Bazar to WAPDA road at ward no.-02 under Kalapara's Pourosava. Ch. 0+500m. (b) Construction of RCC Road starting from Razzak Khan house via Girls School to Kabi Nazrul Islam Road at ward no. 04 under Kalapara's Pourosava. Ch. 0+330m. UIIP kalapara   0.50 0.00 100 109.84 Md. Kamal Hossain 91.76 10/01/2021 11/01/2021 09/01/2022 100 91.60 100 29/09/2022 16.46% Less
535 UIIP-BC/PCO/W-270 (a)Construction of RCC Drain starting from Kartik Babu house to Bollov Kormokar house at ward no. 05 under Kalapara's Pourosava. Ch. 0+250m. (b) Construction of RCC Drain starting from west side of Nur Mohammad Sharif house via Jahirul Islam house, Narayon Shill house to Rahmatpur Khal at ward no. 03 under Kalapara's Pourosava. Ch. 0+152m. (c)Construction of RCC Drain starting from Shamir Pal house to Nimai Sarker house at ward no. 06 under Kalapara's Pourosava. Ch. 0+100m. UIIP kalapara   0.00 100 91.70 Md. Kamal Hossain 78.89 10/01/2021 11/01/2021 09/01/2022 100 78.88 100 29/09/2022 13.97% Less
536 UIIP-BC/PCO/W-271 (a)Construction of RCC Drain starting from Upazila Hospital via Ad, chunnu Mia house to Old Drain at ward no. 01 under Kalapara's Pourosava. Ch. 0+500m. (a)Construction of RCC Drain starting from Madrasa Roadvia Mofij Mia house to Naseria Senior Madrasa at ward no. 07 under Kalapara's Pourosava. Ch. 0+280m. UIIP kalapara   0.00 100 133.81 Md. Kamal Hossain 115.92 10/01/2021 11/01/2021 09/01/2022 100 115.65 100 29/09/2022 13.37% Less
537 UIIP-BC/PCO/W-453 Construction of Rigid Pavement from Chinguria via Pourashava Office to Rahmat Pur Road at ward no-04 & 05 under Kalapara's Pourashava. Ch.0.00m to 1500m. UIIP kalapara   1.50 0.00 100 204.22 M/S Rupali Construction 166.17 31/01/2022 07/02/2021 30/01/2023 100 166.05 100 29/09/2022 18.64% Less
538 UIIP-BC/PCO/W-454 Construction of RCC drain Starting from Baitul Aman Jame Masjid via Nazrul Islam Sarak to Chinguria road at ward No.-04 under Kalapara's Pourashava.Ch.0.00 to 300m. UIIP kalapara   0.00 0 63.35 M/S Antora Trading co 53.36 25/01/2022 01/02/2022 30/01/2023 10 0.00 0 29/09/2022 18.35% Less
539 UIIP-BC/PCO/W-455 A) Construction of RCC 01 ( one) Vent Box Culvert ( 5m x4m x3m) over Kalibari road west side near Yeasin mia House at ward no-01 under Kalapara's Pourashava. B) Construction of RCC 01 ( one) Vent Box Culvert ( 5m x4m x3m) over Nachnapara Khal near Suny Cottage at ward No.-01 under Kalapara's Pourashava. C) Construction of RCC 03 ( Three) Vent Box Culvert( 7.55m x3.70m x3m) over Natun Bazar Canal (Atimkhana) near Yosuf mia House at ward No-04 under Kalapara's Pourashava. D) Construction of RCC Box Culvert (7.8m x 1.5m x 2.4m) Over Chinguria road at ward No.-05 under Kalapara's Pourashava UIIP kalapara   20.00 100 89.80 M/S Rupali Construction 73.32 25/01/2022 01/02/2022 30/01/2023 100 73.02 100 29/09/2022 15.77% Less
540 UIIP-BC/PCO/W-111 1 Improvement of Road at Town Kalikapur Amtoly Main Sarok to West Side Gudigata Sarok Via 93 no Govt. Primary School Ch 0.00-450.0 m WordNo-09 Under Patuakhali Pourashava. 2 Improvement of Road at Town Kalikapur 93 no Govt. Primary School to North Side Md. Abu bakor Munci Goni Munci and Ali Munci house Ch0.00-350.0mWord No-09 Under Patuakhali Pourashava. 3 Construction of 5 nos 450m Dia UPVC Pipe wit Inlet Pit at Town Kalikapur 93 no Govt. Primary School to North Side Md. Abu bakor Munci Goni Munci and Ali Munci house Ch0.00-350.0mWord No-09 Under Patuakhali Pourashava. UIIP patuakhali-s 0.80 0.00 100 145.74 M/S Kohinoor Enterprise 142.56 01/04/2020 07/04/2020 06/04/2020 100 142.55 100 09/10/2024 4.75% Above (Revise Done)
541 UIIP-BC/PCO/W-112 1 Improvement of Road at Chowrasta Mirzagong Sarak Mosque to South Side Polli Bidut Main Highway Ch 0.00-660.0m Under Patuakhali Pourashava.2 Construction of 5 nos Cross Drain 1.00x1.25x8m on Rigid Pavement at Chowrasta Mirzagong Sarak Mosque to South Side Polli Bidut Main Highway Under Patuakhali Pourashava. UIIP patuakhali-s 0.66 0.00 100 190.17 Md. Mizanur Alam 193.85 23/09/2020 07/12/2021 100 192.77 100 09/10/2024 4.85% Above (Revise Done) Work delay due to Recast
542 UIIP-BC/PCO/W-220 1) Improvement of Road at Middle Kolatola Sarok Maik Gazi house to Poura BC road (Via Aziz gazi house), ch 0.00-780.0m, Word No-09, Under Patuakhali Pourashava. 2) Construction of 1 Nos Nox Culvert at Middle Kolatola Sarok Manik gazi house to Poura BC road (Via Aziz gazi house), ch 0.00-330.0m, Word No-09, Under Patuakhali Pourashava. 3) Construction of 2 nos Cross Drain (1.00x1.25x10m) at Middle Kolatola Sarok Maik Gazi house to Poura BC road (Via Aziz gazi house), ch 0.00-780.0m, Word No-09, Under Patuakhali Pourashava. 4) Construction of 5 nos 450m Dia UPVC Pipe wit Inlet Pit at Middle Kolatola Sarok Maik Gazi house to Poura BC road (Via Aziz gazi house), ch 0.00-780.0m, Word No-09, Under Patuakhali Pourashava. UIIP patuakhali-s 0.78 5.00 100 135.01 Md. Mizanur Alam 146.41 13/12/2020 03/01/2021 01/03/2022 100 165.11 100 09/10/2024 8.44% Above Progress is slow due to negligence of the assigned Contractor
543 UIIP-BC/PCO/W-450 Construction of RCC Drain with footpath at Sabujbag main road from Govt. College Gate-2 to Boy's Hostel with top slab of existing drain in ward No.-04 of Patuakhali Pourashava. (Ch:0.00-500.00m) UIIP patuakhali-s 0.00 72 191.45 M/S Jakaullah & Brothers-M/S Ayan Entr. 206.36 23/02/2022 28/02/2022 22/02/2023 88 149.05 72 09/10/2024 7.79% Above
544 UIIP-BC/PCO/W-562 A) Construction of RCC Road starting fromAd, Aziz house to Shimulbag Shahadat house in Ward No.03 of Patuakhali Pourashava (Ch: 0.00-260m) and Link Road (Ch : 0.00-110m & Ch:0.00-90.00m). " B) Construction of RCC Drain Starting from Ad, Aziz house to Shimulbag Shahadat house in Ward No,03 of Patuakhali Pourashava (Ch: 0.00-260.00m) and Link drain (Ch:0-200.00m). " " C) Construction of RCC Road from Town Joinkati Main Road to Bagan Bari Road (New Salim Mia Zamia Mosque) at Ward No : 01 of Patuakhali Pourashava (Ch: 0.00-145.00m). " " D) Construction of RCC Drain Starting from Sonali Bank Turning to Tax Office & 01 No. Cross Drain at Ward No. 08 of Patuakhali Pourashava (Ch: 0.00-275.00m) " UIIP patuakhali-s 0.61 65 304.61 Gazi Al-Mamun-Ayan (JV) 319.48 28/03/2023 03/04/2023 27/03/2024 85 208.47 65 09/10/2024
545 UIIP-BC/PCO/W-534 A) Construction of Shed for Public Transport Passenger at 4 Lane Road Circuit House South Side of Patuakhali Pourashava B) Construction of Shed for Public Transport Passenger at 4 Lane Road Sonali Bank South Side of Patuakhali Pourashava C) Construction of Single Storied Public Toilet Building (Type A) at 4 Lane Road Circuit House South Side of Patuakhali Pourashava UIIP patuakhali-s 0 69.48 M/S Jui Enterprise 69.35 14/02/2024 23/02/2024 13/02/2025 19 0.00 0 09/10/2024
546 UIIP/PCO/G-39 Implementation & Supply 358 nos Waste Basket (120 ltr) & 35 nos Non-motorized vehicle (van) under Patuakhali Pourashava District: Patuakhali. UIIP patuakhali-s 0 40.00 0.00 0 0.00 0 09/10/2024
547 UIIP-BC/PCO/W-218 1. Improvement of Road at Nondokanai- Mirzagong Main Road to North Side Akusha Sarok ( Ch0.00-435.0m) in Ward No-09 Under Patuakhali Pourashava. UIIP patuakhali-s   0.44 0.00 100 78.06 Md. Mizanur Alam 109.86 28/02/2021 03/01/2021 28/02/2022 100 109.86 100 29/09/2022 8.34% Above (Revise Done)
548 UIIP-BC/PCO/W-219 1 Improvement of Road at Puran Feery Ghat Main Road to South Side Mirzagong Main Road Muktizodda SarokCh 0.00-760.0 m Under Patuakhali Pourashava UIIP patuakhali-s   0.76 0.00 100 108.55 Md. Mizanur Alam 138.75 28/02/2021 03/01/2021 28/02/2022 100 138.74 100 29/09/2022 4.41% Above
549 UTMIDP- DAS /PAT / WR-25 1. Improvement of Dashmina UPC- Kharihat via ART College Road by BC at Ch. 00m-726m. Under Dashmina Upazila, Dist: Patuakhali. (Road ID: 578523001) 2.Improvement of Road from Lutfar Rahaman House- Dashmina Khankaa Ch. 00-1120m. under Dashmina Upazila, Dist: Patuakhali. (Road ID: 578525046) UTMIDP dashmina 1.85 194.29 Samim Ahasun - Tanvir Ahmed (JV) 187.33 0