1
|
RBCTRHD/CHA/R-03
|
Improvement of Hazigonj Bazar Rail Station-Tarapalla Road (Ch 00-3700m, 10620-10820m)
|
|
haziganj
|
0
|
3.90
|
0.00
|
84
|
12540982.00
|
Mizanur Rahman Liton
|
13850000.00
|
28/03/2013
|
05/04/2013
|
02/05/2014
|
100
|
11692531.00
|
84
|
01/02/2017
|
|
2
|
CRMIDP/CHND/W-429
|
Jonata Bazar
|
CRMIDP
|
haimchar
|
|
|
|
85
|
251.00
|
"M/S Aziz Brothers Holding No-401, Kabi Nazrul Islam Road, Chandpur "
|
201.79
|
20/02/2020
|
|
30/06/2022
|
95
|
170.93
|
85
|
28/07/2022
|
|
3
|
CRMIDP/CHND/W-434
|
Kalipur Bazar
|
CRMIDP
|
matlab (uttar)
|
|
|
|
50
|
324.00
|
Shams Engineering & Construction Ltd
|
260.00
|
05/04/2020
|
|
30/06/2022
|
65
|
129.07
|
50
|
28/07/2022
|
|
4
|
UMC/Chan/Kac/13/C-006
|
Construction of 3 Storied (5 Storied Foundation) Upazila Muktijoddha Complex Bhaban under Kachua Upazila, District: Chandpur.
|
CUMCP
|
kachua
|
0
|
|
0.00
|
50
|
26928396.47
|
M/S. Hossain Trading
|
28141294.30
|
18/11/2013
|
18/11/2013
|
30/06/2015
|
90
|
14283040.00
|
50
|
01/02/2017
|
|
5
|
UMC/CHA/MOT(D)/ 14/C-135
|
Construction of Upazila Muktijoddha Complex Bhaban under Matlab South Upazila, District: Chandpur.
|
CUMCP
|
matlab (dakshin)
|
0
|
|
0.00
|
0
|
24540316.00
|
Appollo Engineering and Construction Ltd.
|
21636455.00
|
23/08/2015
|
23/08/2015
|
30/08/2016
|
0
|
0.00
|
0
|
01/02/2017
|
|
6
|
UMC/CHA/MOT(D)/14/C-135
|
Construction of Upazila Muktijoddha Complex Bhaban under Matlab South Upazila, District: Chandpur.
|
CUMCP
|
matlab (dakshin)
|
0
|
|
0.00
|
0
|
24540316.00
|
Appollo Engineering and Construction Ltd.
|
21636455.00
|
23/08/2015
|
30/08/2015
|
30/08/2016
|
0
|
0.00
|
0
|
30/01/2017
|
|
7
|
UMC/CHA/MOT(U)/14/C-134
|
Construction of Upazila Muktijoddha Complex Bhaban under Matlab Uttar Upazila, District: Chandpur.
|
CUMCP
|
matlab (uttar)
|
0
|
|
0.00
|
52
|
26335463.00
|
Appollo Engineering and Construction Ltd.
|
22488835.00
|
23/08/2015
|
23/08/2015
|
30/08/2016
|
75
|
11716960.00
|
52
|
01/02/2017
|
|
8
|
UMC/CHA/MOT(U)/14/C-13
|
Construction of Upazila Muktijoddha Complex Bhaban under Matlab Uttar Upazila, District: Chandpur.
|
CUMCP
|
matlab (uttar)
|
0
|
|
0.00
|
52
|
26335463.00
|
Appollo Engineering and Construction Ltd.
|
22488835.00
|
23/08/2015
|
30/08/2015
|
30/08/2016
|
70
|
11716960.00
|
52
|
30/01/2017
|
|
9
|
GCP-3/Ch-M04 ID 413453004
|
Periodic Maintenance (Overlay) of R&H Dakshin Rupsha UP Gridakalindia to Char Dhukhia UP Islamganj bazarAligonj Road via shahebganj bazar from Ch. 5440 to 6810m
|
GCP-3
|
faridganj
|
|
1.34
|
|
|
52.20
|
M/S. Ratin Ptwary Traders
|
35.90
|
|
28/06/2018
|
27/02/2019
|
30
|
|
|
|
|
10
|
GCP-3/Ch-M13 ID. 413454029
|
Periodic Maintenance Widening and Rehabilitation of CIP Embankment to Islampur from Ch 00m to 1820m
|
GCP-3
|
faridganj
|
|
1.82
|
|
|
99.57
|
M/S. Alif Enterprise
|
104.55
|
|
21/06/2018
|
27/02/2019
|
10
|
|
|
|
|
11
|
GCP-3/Ch-M65
|
Periodic Maintenance Widening and Rehabilitation of Faridganj RHD to Rampur GC via Katakhali bazar Road ID No. 413452014 from Ch 00m to 3000m
|
GCP-3
|
faridganj
|
|
|
|
|
126.25
|
M/S. Taj Enterprise
|
119.94
|
|
19/11/2018
|
25/09/2019
|
5
|
|
|
|
|
12
|
GCP-3/Ch-W45 ID No 413453022
|
Improvement of Dakshin Faridganj UP Kalirbazar to Sahebgonj Bazar Road from Ch.00 to 1000m .b Construction of 1.65m Culvert on Dakshin Faridganj UP Kalirbazar to Sahebgonj Bazar Road.c 100m Protective works at Dakshin Faridganj UP Kalirbazar to Sahebgonj
|
GCP-3
|
faridganj
|
|
1.00
|
|
|
81.71
|
M/S Alif Enterprise
|
85.79
|
|
21/06/2018
|
27/02/2019
|
100
|
|
|
|
|
13
|
GCP-3/Ch-W47 ID No 413454034
|
Improvement of Girdakalindia Bazar to Chowmohoni bazar via shabgonj bazar Road from Ch.700 to 1700m .b Construction of 1.65m Culvert on Girdakalindia Bazar to howmohoni bazar via shabgonj bazar Road under Faridgonj upazila Dist. Chandpur.c 111m Protectiv
|
GCP-3
|
faridganj
|
|
1.00
|
|
|
76.47
|
The Royal Enterprise
|
76.47
|
|
23/04/2018
|
22/12/2018
|
100
|
|
|
|
|
14
|
GCP-3/Ch-SM01
|
Rehabilitation of Haimchar bazar (Degree College)-Charbhairabi Bazar via Gazinagar Road (By HBB) to 6th National COMDECA place (Ch. 00-620m)
|
GCP-3
|
haimchar
|
|
0.62
|
|
|
30.00
|
M/S. Jasim & Brothers
|
28.50
|
|
22/03/2018
|
18/04/2018
|
100
|
|
|
|
|
15
|
GCP-3/Ch-SM02
|
Rehabilitation of Haimchar bazar (Degree College)-Charbhairabi Bazar via Gazinagar Road (By HBB) to 6th National COMDECA place (Ch. 620-1240m)
|
GCP-3
|
haimchar
|
|
0.62
|
|
|
30.00
|
M/S. Aboni Traders
|
28.50
|
|
29/03/2018
|
18/04/2018
|
100
|
|
|
|
|
16
|
GCP-3/Ch-M02 ID 413473002
|
Periodic Maintenance (Re-seal) of Haimchar GC to Upazila H/Q from Ch. 00 to 1455m
|
GCP-3
|
haimchar
|
|
1.46
|
|
|
26.95
|
M/S. M.Asma Enterprise
|
26.24
|
|
22/03/2018
|
06/12/2018
|
20
|
|
|
|
|
17
|
GCP-3/Ch-M03 ID No 413473003
|
Periodic Maintenance (Re-seal) of Algi South UP to Rayer Bazar Bordar Pool Road via Purba Algi Govt. Paimary School from Ch. 00 to 1955m
|
GCP-3
|
haimchar
|
|
1.96
|
|
|
30.59
|
M/S. M.Asma Enterprise
|
29.47
|
|
22/03/2018
|
06/12/2018
|
100
|
|
|
|
|
18
|
GCP-3/Ch-M41 ID No. 413474041 ID No. 413474044 ID No. 413474024 ID No. 413474022
|
a) Periodic Maintenance (Overlay) of Mahajampur Eid Goan to Mahajampur Syal Bari Mosque road from Ch 000m to 574m. b) Periodic Maintenance (Overlay) of Algi North UP Office to Rayer Bazar Road from Ch 000m to1316m. c) Periodic Maintenance (Overlay) of G
|
GCP-3
|
haimchar
|
|
2.41
|
|
|
95.41
|
M/S. Ananto Traders
|
90.64
|
|
29/05/2018
|
04/02/2019
|
5
|
|
|
|
|
19
|
GCP-3/Ch-W07 ID. 413492005
|
a) Improvement of Hazigonj to Palishara bazar road from Ch. 6711 to 8516m under Hazigonj Upazila Dist. Chandpur. b) 680m Protective works at Hazigonj to Palishara bazar road
|
GCP-3
|
haziganj
|
|
1.11
|
|
|
183.35
|
M/S. Faysal Steel
|
193.54
|
|
03/05/2018
|
09/01/2019
|
55
|
|
|
|
|
20
|
GCP-3/Ch-W11 ID No 413494018
|
a) Improvement of Menapur Tin rasta to Noagoan Hazi market Road from Ch.00 to 1200m under Hazigonj Upazila Dist. Chandpur. b) 222m Protective works at Menapur Tin rasta to Noagoan Hazi market Road under Hazigonj Upazila Dist. Chandpur. C) Construction of
|
GCP-3
|
haziganj
|
|
1.20
|
|
|
93.39
|
M/S. Jahanara Traders
|
100.06
|
|
30/04/2018
|
29/12/2018
|
10
|
|
|
|
|
21
|
GCP-3/Ch-W12 ID No 413494002
|
a) Improvement of Randunimura to Gopalkhore Road from Ch. 2440 to 2900m under Hazigonj Upazila Dist. Chandpur. b) 330m Protective works at Randunimura to Gopalkhore Road
|
GCP-3
|
haziganj
|
|
0.46
|
|
|
49.78
|
M/S. Tanim Traders
|
49.58
|
|
06/03/2018
|
12/11/2018
|
5
|
|
|
|
|
22
|
GCP -3/Ch-M42 ID No. 413584027 ID No. 413584013
|
a) Periodic Maintenance Widening and Rehabilitationof Moomkhola to Tulpai to Kolin road from Ch 000m to 1775m b) Periodic Maintenance Rehabilitationof North Shibpur to Nindapur road from Ch 000m to 2158m
|
GCP-3
|
kachua
|
|
2.16
|
|
|
123.59
|
M/S. Nur Hossain Traders
|
129.74
|
|
23/05/2018
|
29/01/2019
|
90
|
|
|
|
|
23
|
GCP-3/Ch-M43 ID No. 413584071 ID No. 413585207 ID No. 413584076
|
a) Periodic Maintenance (Rehabilitationo) of Malchua to Charatbanga road from Ch 000m to 2300m b) Periodic Maintenance (Rehabilitationo) of Chandpur Bazar to paranpur Road from Ch 000m to 835m c) Periodic Maintenance (Rehabilitation) of Uzani to Ghagra
|
GCP-3
|
kachua
|
|
0.93
|
|
|
124.29
|
M/S. Nur Hossain Traders
|
130.48
|
|
23/05/2018
|
29/01/2019
|
10
|
|
|
|
|
24
|
GCP-3/Ch-W01 ID No. 413584081
|
a) Improvement of Bayek Bazar to Joari khola road from Ch. 570 to 2292m b) 382m Protective work at Bayek Bazar to Joari khola road
|
GCP-3
|
kachua
|
|
0.96
|
|
|
141.09
|
Z Enginering Ltd
|
146.16
|
|
22/05/2018
|
27/01/2019
|
15
|
|
|
|
|
25
|
GCP-3/Ch-W21 ID No 413584083
|
a) Improvement of Malchua to Nandan pur road from Ch.00 to 1590m under Kachua Upazila Dist. Chandpur. b) Construction of 3.5m culvert at Malchua to Nandan pur road under Kachua Upazila Dist. Chandpur. C) 100m Protective works at Malchua to Nandan pur roa
|
GCP-3
|
kachua
|
|
1.59
|
|
|
120.29
|
M/S. Ranu Mia
|
119.50
|
|
20/03/2018
|
26/11/2018
|
20
|
|
|
|
|
26
|
GCP-3/Ch-W22 ID No 413584075
|
Improvement of Baichara Madrasha to Shingadda Bazar road from Ch.00 to 865m
|
GCP-3
|
kachua
|
|
0.87
|
|
|
56.24
|
M/S. Ranu Mia
|
55.84
|
|
20/03/2018
|
26/11/2018
|
80
|
|
|
|
|
27
|
GCP-3/Ch-W23 ID No 413583026
|
a) Improvement of Kadla UP Batabaria to Shahadebpur west UP road via Bachaia Brick field road from Ch.6900 to 7410m. b) Construction of 0.6m culvert at Kadla UP Batabaria to Shahadebpur west UP road via Bachaia Brick field road C) 78m Protective works a
|
GCP-3
|
kachua
|
|
0.51
|
|
|
40.42
|
M/S. Ranu Mia
|
40.22
|
|
20/03/2018
|
26/11/2018
|
10
|
|
|
|
|
28
|
GCP-3/Ch-W39 ID No 413584120
|
aImprovement of Ujani to Nowabpur road to Akania road via Komorkasha road from Ch.00 to 2500m .b Construction of 3.625m Culvert on Ujani to Nowabpur road to Akania road via Komorkasha road c 423m Protective works at Ujani to Nowabpur road to Akania road
|
GCP-3
|
kachua
|
|
2.50
|
|
|
201.81
|
M/S. Ranu Mia
|
201.61
|
|
03/04/2018
|
02/12/2018
|
60
|
|
|
|
|
29
|
GCP-3/Ch-W40 ID No 413584077
|
aImprovement of Kandirpar to Laxmipur road from Ch.642 to 1657m.b Construction of 0.625m Culvert on Kandirpar to Laxmipur road .c 105m Protective works at Kandirpar to Laxmipur road
|
GCP-3
|
kachua
|
|
1.02
|
|
|
74.78
|
M/S. Shikder Assiociet
|
73.66
|
|
25/04/2018
|
02/01/2019
|
40
|
|
|
|
|
30
|
GCP-3/Ch-M20 ID No. 413964011
|
Periodic Maintenance Rehabilitation of Rajargaon to Mahamaya Road from Ch 00m to 450m
|
GCP-3
|
matlab (dakshin)
|
|
0.45
|
|
|
17.76
|
M/S. Aboni Traders
|
17.66
|
|
25/04/2018
|
02/01/2019
|
100
|
|
|
|
|
31
|
GCP-3/Ch-M21 ID No. 413965001
|
Periodic Maintenance Rehabilitation of DC road to Jaforia road from Ch 00m to 208m
|
GCP-3
|
matlab (dakshin)
|
|
0.21
|
|
|
9.56
|
Md. Chidu Mizi
|
9.95
|
|
08/05/2018
|
14/01/2019
|
100
|
|
|
|
|
32
|
GCP-3/Ch-M40 ID No. 413963002
|
Periodic Maintenance (Rehabilitation) of Matlab to Bohori Arong to Karbanda Road from Ch 3320m to 6305m
|
GCP-3
|
matlab (dakshin)
|
|
2.99
|
|
|
159.44
|
M/S. Harun & Sons
|
166.38
|
|
11/06/2018
|
10/02/2019
|
5
|
|
|
|
|
33
|
GCP-3/Ch-W02 ID. 413965004
|
a) Improvement of Ghoradhari to Santir Bazar Road from Ch. 00 to 1356m b) 106m Protective works at Ghoradhari to Santir Bazar Road
|
GCP-3
|
matlab (dakshin)
|
|
0.21
|
|
|
99.17
|
Md. Chidu Mizi
|
101.99
|
|
07/03/2018
|
10/11/2018
|
100
|
|
|
|
|
34
|
GCP-3/Ch-W04 ID No. 413963011
|
a) Improvement of Matlab bazar to Uddamdi to Farzikandi Road from Ch.2150 to 2838m under Matlab South Upazila Dist. Chandpur. b) 60m Protective works at Boalia to Achalchila Road Matlab bazar to Uddamdi to Farzikandi Road.
|
GCP-3
|
matlab (dakshin)
|
|
0.69
|
|
|
52.20
|
M/S. Aboni Traders
|
53.25
|
|
07/03/2018
|
12/11/2018
|
30
|
|
|
|
|
35
|
GCP-3/Ch-W05 ID. 413964011
|
a) Improvement of Rajargaon to Mahamaya Road Matlab South Part from Ch. 850 to 2900m under Matlab South Upazila Dist. Chandpur. b) 490m Protective works at Rajargaon to Mahamaya Road Matlab South Part
|
GCP-3
|
matlab (dakshin)
|
|
1.00
|
|
|
169.52
|
M/S. National Trade System
|
173.19
|
|
13/03/2018
|
19/11/2018
|
0
|
|
|
|
|
36
|
GCP-3/Ch-W06 ID No 413964017
|
a) Improvement of Machuakahal to Charot Bhanga Road from Ch.426 to 1920m. b) 441m Protective works at Machuakahal to Charot Bhanga Road
|
GCP-3
|
matlab (dakshin)
|
|
1.41
|
|
|
123.51
|
M/S. Irin Enterprise
|
126.17
|
|
07/03/2018
|
11/11/2018
|
65
|
|
|
|
|
37
|
GCP-3/Ch-M15 ID 413764002
|
Periodic Maintenance Reseal of SujatpurBegumpur to Ludhua from Ch 00m to 1500m
|
GCP-3
|
matlab (uttar)
|
|
1.50
|
|
|
34.86
|
Mizanur Rahman(Liton)
|
34.85
|
|
08/05/2018
|
14/01/2019
|
100
|
|
|
|
|
38
|
GCP-3/Ch-M16 ID No. 413764061
|
Periodic Maintenance Rehabilitation of Naburkandi to Gazipur road from Ch 00m to 2110m
|
GCP-3
|
matlab (uttar)
|
|
2.11
|
|
|
61.56
|
M/S. Noor Syndacat
|
61.47
|
|
03/05/2018
|
09/01/2019
|
100
|
|
|
|
|
39
|
GCP-3/Ch-M17 ID No. 413764081
|
Periodic Maintenance Overlay of Otarchar High School to Baiddanathpur from Ch 00m to 900m
|
GCP-3
|
matlab (uttar)
|
|
0.90
|
|
|
26.65
|
M/S. Omi Enterprise
|
26.62
|
|
08/05/2019
|
14/01/2019
|
100
|
|
|
|
|
40
|
GCP-3/Ch-M18 ID No. 413764092
|
Periodic Maintenance Widening and Rehabilitation of Sujatpur bazar to biddut office to Anandabazar via sarkerbari road from Ch 00m to 2300m
|
GCP-3
|
matlab (uttar)
|
|
2.30
|
|
|
97.94
|
M/S. Akkas Construction
|
97.80
|
|
07/05/2018
|
12/01/2019
|
100
|
|
|
|
|
41
|
GCP-3/Ch-W33 ID No 413765165
|
aImprovement of Nandalalpur Beri bundh to Goni Sarker bari road road from Ch.00 to 650m un. b 206m Protective works at Nandalalpur Beri bundh to Goni Sarker bari road road
|
GCP-3
|
matlab (uttar)
|
|
0.65
|
|
|
54.36
|
M/S. Akkas Construction
|
54.28
|
|
30/04/2018
|
29/12/2018
|
65
|
|
|
|
|
42
|
GCP-3/Ch-W34 ID No 413764091
|
Improvement of Shatnal DC road to Abu Market road to WDB Beri Bandgh via Purba Shatnal road from Ch.500 to 1445m .b 75m Protective works at Shatnal DC road to Abu Market road to WDB Beri Bandgh via Purba Shatnal road
|
GCP-3
|
matlab (uttar)
|
|
0.95
|
|
|
67.45
|
M/S. Aboni Traders
|
67.08
|
|
23/04/2018
|
06/01/2019
|
30
|
|
|
|
|
43
|
GCP-3/Ch-W35 ID No 413765029
|
Improvement of Shataki bazar to Shataki Village to Rostam Market Road from Ch.1045 to 2030m .b 25m Protective works at Shataki bazar to Shataki Village to Rostam Market Road
|
GCP-3
|
matlab (uttar)
|
|
0.99
|
|
|
67.69
|
M/S. Nur Syldacat
|
70.94
|
|
23/04/2018
|
22/12/2018
|
65
|
|
|
|
|
44
|
GCP-3/Ch-W36 ID No 413764040
|
aImprovement of Naori Bazar to Chowrasta bazar road from Ch.1000 to 2100m under Matlab Uttar upazila Dist. Chandpur..b Construction of 3.08m Culvert on Naori Bazar to Chowrasta bazar road .c 305m Protective works at Naori Bazar to Chowrasta bazar road
|
GCP-3
|
matlab (uttar)
|
|
1.10
|
|
|
97.88
|
Md. Mizanur Rahman Liton
|
97.86
|
|
18/04/2018
|
17/12/2018
|
50
|
|
|
|
|
45
|
GCP-3/Ch-W37 ID No 413765166
|
aImprovement of Purbo Islamabad Boida Bari pucca road to Rahim Fakir Majar road from Ch.00 to 1000m .b Construction of 2.25m Culvert on Purbo Islamabad Boida Bari pucca road to Rahim Fakir Majar road c 228m Protective works at Purbo Islamabad Boida Bari
|
GCP-3
|
matlab (uttar)
|
|
1.00
|
|
|
95.71
|
M/S. Akkas Construction
|
85.64
|
|
30/04/2018
|
29/12/2018
|
30
|
|
|
|
|
46
|
GCP-3/Ch-W38 ID No 413764104
|
Improvement of Nandalalpur to Sujatpur pacca road to Santer bari More to Modda Islamabad Kalimuddin Bepari bari to Dasher Arong road from Ch.00 to 1150m .b Construction of 3.00m Culvert on Nandalalpur to Sujatpur pacca road to Santer bari More to Modda I
|
GCP-3
|
matlab (uttar)
|
|
1.15
|
|
|
92.07
|
M/S. Akkas Construction
|
92.00
|
|
30/04/2018
|
29/12/2018
|
55
|
|
|
|
|
47
|
GCP-3/Ch-W48 ID No 413763016
|
a) Improvement of Amirabad bazar to Bamarbazar to Jahirabad UP Office road Road from Ch 2570m to 5327m, b) 552m Protective works at the same road
|
GCP-3
|
matlab (uttar)
|
|
2.76
|
|
|
215.11
|
M/S. Omi Enterprise
|
215.08
|
|
08/05/2018
|
14/01/2019
|
10
|
|
|
|
|
48
|
GCP-3/Ch-W49 ID No 413763023
|
a) Improvement of Ludhua Amtala bazar to Shatnal UP Office Kalipur via Walipur Madrasha road from Ch 4355m to 5605m and 6730m to 7350m b) Construction of 1.25m culvert on the same road. c) 217m Protective works at the same road
|
GCP-3
|
matlab (uttar)
|
|
1.25
|
|
|
142.42
|
Mizanur Rahman Liton
|
149.51
|
|
11/06/2018
|
10/02/2019
|
25
|
|
|
|
|
49
|
GCP-3/Ch-W50 ID No 413764088
|
a) Improvement of Kalipur bazar kamlakandi road to Kalipur to Baribhanga to Kalipur to Imampur to Lalpur DC road from Ch 1175m to 1920m b) Construction of 0.62m culvert on the same road. c) 35m Protective works at the same road
|
GCP-3
|
matlab (uttar)
|
|
0.75
|
|
|
55.62
|
M/S. Noor Syndicate
|
55.56
|
|
06/05/2018
|
12/01/2019
|
60
|
|
|
|
|
50
|
GCP-3/Ch-W51 ID No.413764098
|
a) Improvement of Rarikandi to mandertoli bazar via kazikandi registered primary School road from Ch 000m to 1350m b) 140m Protective works at the same road
|
GCP-3
|
matlab (uttar)
|
|
1.35
|
|
|
99.96
|
M/S. Noor Syndicate
|
97.91
|
|
06/05/2018
|
12/01/2019
|
45
|
|
|
|
|
51
|
GCP-3/Ch-W52 ID No.413764106
|
a) Improvement of Improvement of Pachani Chowrasta to Satani Bottola via biddut office road from Ch 750m to 1750m b) Construction of 0.62m culvert on the same road. c) 246m Protective works at the same road
|
GCP-3
|
matlab (uttar)
|
|
1.00
|
|
|
82.54
|
M/S. Omi Enterprise
|
82.50
|
|
08/05/2018
|
14/01/2019
|
50
|
|
|
|
|
52
|
GCP-3/Ch-M49 ID No. 413953012
|
Periodic Maintenance(Overlay)of Aynatali bazar to Daiara bazar Via Chitoshi (W) U.P office road from Ch 480m to 3172m
|
GCP-3
|
shahrasti
|
|
2.69
|
|
|
82.66
|
M/S. Saiful Assiociats
|
86.32
|
|
03/06/2018
|
09/02/2019
|
10
|
|
|
|
|
53
|
GCP-3/Ch-W24 ID No 413953004
|
a) Improvement of Suchipara N UP Office to Chitoshi bazar GC Via Monipur Primary School Road from Ch.4220 to 6220m under Shahrasti Upazila Dist. Chandpur. b) 51m Protective works at Suchipara N UP Office to Chitoshi bazar GC via Monipur Primary School Ro
|
GCP-3
|
shahrasti
|
|
2.00
|
|
|
134.87
|
M/S. Sekandar Enterprise
|
148.10
|
|
09/05/2018
|
14/01/2019
|
25
|
|
|
|
|
54
|
GCP-3/Ch-W26 ID No 413953015
|
a) Improvement of Suchipara (S) UP office to Keshranga to Noring bazar via Dashna para road from Ch.2570 to 4473m b) 65m Protective works at Suchipara (S) UP office to Keshranga to Noring bazar via Dashna para road
|
GCP-3
|
shahrasti
|
|
1.90
|
|
|
128.29
|
M/S. Gulshan International
|
127.86
|
|
12/04/2018
|
18/12/2018
|
45
|
|
|
|
|
55
|
GCP-3/Ch-W28 ID No 413954013
|
a) Improvement of Nahara to Khila road from Ch. 00 to 1066m under Shahrasti Upazila Dist. Chandpur. b) 95m Protective works at Nahara to Khila road
|
GCP-3
|
shahrasti
|
|
1.07
|
|
|
73.77
|
M/S. Faruk Hossain
|
75.61
|
|
03/04/2018
|
14/12/2018
|
70
|
|
|
|
|
56
|
GCP-3/Ch-W29 ID No 413954038
|
a) Improvement of Comilla to Chandpur R&H to Alipur bottala road from Ch. 850 to 1785m under Shahrasti Upazila Dist. Chandpur. b) 105m Protective works at Comilla to Chandpur R&H to Alipur bottala road
|
GCP-3
|
shahrasti
|
|
0.94
|
|
|
68.09
|
M/S Patwary Enterprise
|
67.89
|
|
27/04/2018
|
04/12/2018
|
65
|
|
|
|
|
57
|
GCP-3/Ch-W30 ID No 413954073
|
a) Improvement of Vabnabari Konar to Ahmmad Nogor Madrasha via Rajakha bazar road from Ch. 500 to 1529m . b) 18m Protective works at Vabnabari Konar to Ahmmad Nogor Madrasha via Rajakha bazar road
|
GCP-3
|
shahrasti
|
|
1.03
|
|
|
68.50
|
Mizanur Rahman Liton
|
66.50
|
|
04/04/2018
|
14/12/2018
|
100
|
|
|
|
|
58
|
GCP-3/Ch-W31 ID No 413954099
|
a) Improvement of Shahid Abul Kashem Road to Suchipara North UP office to Shorsak bazar road from Ch. 2610 to 3640m b) 72m Protective works at Suchipara North UP office to Shorsak bazar road
|
GCP-3
|
shahrasti
|
|
1.03
|
|
|
71.49
|
M/S. Jarin Enterprise
|
73.24
|
|
11/04/2018
|
17/12/2018
|
40
|
|
|
|
|
59
|
GSIDP/CDP/DW-1
|
Improvement of Nahara Jame Mosque. Union: Kachua (Uttor), Latitude: 23.65361, Longitude: 91.50444
|
GSIDP
|
kachua
|
|
|
|
0
|
9.84
|
M/S Fahim Traders
|
9.35
|
05/06/2018
|
|
11/02/2019
|
0
|
|
0
|
21/03/2019
|
|
60
|
GSIDP/CDP/DW-2
|
Improvement of Mazigacha Jamalia Graveyard. Union: Bitara, Latitude: 23.674722, Longitude: 91.353055
|
GSIDP
|
kachua
|
|
|
|
0
|
7.88
|
M/S. Kamal Hossain
|
7.49
|
|
|
|
0
|
|
0
|
21/03/2019
|
|
61
|
GSIDP/CDP/DW-3
|
Improvement of Pathair Madda para Jame Mosque. Union: Pathir, Latitude: 23.730, Longitude: 91.37888
|
GSIDP
|
kachua
|
|
|
|
100
|
5.00
|
M/S Patni Traders
|
4.75
|
03/06/2018
|
|
11/01/2018
|
100
|
4.75
|
100
|
21/03/2019
|
|
62
|
GSIDP/CDP/DW-7
|
Improvement of Taltoli Baitul Ali Central Jame Mosque. Union: Gohat (Uttor), Latitude: 23.55, Longitude: 91.82222
|
GSIDP
|
kachua
|
|
|
|
100
|
20.61
|
M/S Mia Traders
|
19.58
|
28/02/2018
|
|
11/11/2018
|
100
|
19.53
|
100
|
21/03/2019
|
|
63
|
GSIDP/CDP/SDW-11
|
Improvement of Baraiara Uttar para Molla bari Jame Mosque. Union: Pathoyr, Latitude: 23.3772, Longitude: 90.8613
|
GSIDP
|
kachua
|
|
|
|
100
|
10.00
|
M/S. Hi-Tech Enterprise
|
9.50
|
14/08/2018
|
|
01/11/2018
|
100
|
9.21
|
100
|
21/03/2019
|
|
64
|
IRIDP-2/CDP/DW-101
|
Improvement of Chandkhar Dokan-Pingra-Raldia Road (Ch.3345 - 5235m, ID No.413224002)
|
IRIDP-2
|
chandpur-s
|
413224002
|
1.89
|
0.00
|
0
|
10808136.00
|
M/S. Sanim Enterprise
|
10121817.00
|
22/12/2016
|
29/12/2016
|
30/06/2019
|
25
|
0.00
|
0
|
28/03/2019
|
|
65
|
IRIDP-2/CDP/DW-109
|
Improvement of Paschim Gupti UP (Khajuria)-Austra Bazar road via Solodana road (Sholodana Azim Bhuyia bari to Noiwar bari road) ( Ch. 1750-3310m)
|
IRIDP-2
|
faridganj
|
413453026
|
1.56
|
0.00
|
|
9158938.00
|
0
|
0.00
|
|
|
30/09/2018
|
100
|
|
|
28/03/2019
|
|
66
|
IRIDP-2/CDP/DW-10
|
Improvement of Palishara bazar-Kashimpur bazar Gandabyapur(s) UP (Deshgoun) road (Ch. 3000-4870m)
|
IRIDP-2
|
haziganj
|
413493022
|
1.87
|
0.00
|
0
|
11457286.00
|
Md Abdul Kader Bapari
|
10248572.00
|
28/02/2016
|
07/03/2016
|
15/10/2018
|
100
|
0.00
|
0
|
28/03/2019
|
|
67
|
IRIDP-2/CDP/DW-9
|
Improvement of Uttar Rajargaon UP (Rajargaon bazaar)-Mukundashar bazar road (ch.00-1200m)
|
IRIDP-2
|
haziganj
|
|
1.20
|
|
|
77.40
|
M/S. Ahsan Habib Arun
|
68.48
|
|
21/02/2016
|
02/10/2016
|
100
|
|
|
|
|
68
|
IRIDP-2/CDP/DW-10
|
Improvement of Palishara bazaar-Kashimpur bazaar Gandabyapur (S) UP (Deshgoun) road (ch.3000-4870m)
|
IRIDP-2
|
haziganj
|
|
1.80
|
|
|
114.57
|
Md. Abdul Kader Bapari
|
102.49
|
|
06/03/2016
|
30/10/2018
|
95
|
|
|
|
|
69
|
IRIDP-2/CDP/DW-11
|
(a) Improvement of Belchow Bazar R&H-Moyshamura Bazar Road (ch.1010-2000m).(b) Construction of 2.0x2.00m Culvert at ch.1590m on the same road
|
IRIDP-2
|
haziganj
|
|
0.99
|
|
|
57.03
|
Md. Afzal Hossain
|
50.18
|
|
06/03/2016
|
31/12/2017
|
100
|
|
|
|
|
70
|
IRIDP-2/CDP/DW-56
|
Improvement of Kachua Kashimpur R&H road-Monpura Madrasha road upto Shaid Mondar Bari (Ch. 00-2500m) (Road ID 413585025) (Tender IS No. 46633)
|
IRIDP-2
|
kachua
|
413585025
|
2.50
|
0.00
|
0
|
12704614.00
|
M/S. Appolo Engineering
|
11821084.00
|
04/04/2016
|
10/04/2016
|
30/11/2018
|
60
|
0.00
|
0
|
28/03/2019
|
|
71
|
IRIDP-2/CDP/DW-73
|
Construction of 34.00m RCC Girder Bridge on Nindapur Gutpur road at Ch. 450m (Road ID 413584026)
|
IRIDP-2
|
kachua
|
413584026
|
|
34.00
|
0
|
13468812.00
|
M/S. Khan Enterprise
|
12377888.00
|
06/06/2016
|
13/06/2016
|
31/10/2018
|
96
|
0.00
|
0
|
28/03/2019
|
|
72
|
IRIDP-2/CDP/DW-72
|
Construction of 20.00m RCC Girder Bridge over Udara Khal on Kachua-Raghubathpur GC road to Ali Ahamed Master bari road at Ch. 3m (Road ID 413585272)
|
IRIDP-2
|
kachua
|
413585272
|
|
20.00
|
0
|
11928762.00
|
M/S. Ahsan Habib Aurun
|
11258564.00
|
06/06/2016
|
13/06/2016
|
30/05/2016
|
100
|
0.00
|
0
|
28/03/2019
|
|
73
|
IRIDP-2/CDP/DW-77
|
Construction of 28.00m RCC Girder Bridge over Boailjuri Khal on Dogor - Noadda - Paskhali Road at Ch. 1420m
|
IRIDP-2
|
kachua
|
413585159
|
|
28.00
|
0
|
12904732.00
|
M/S. Aboni Traders
|
11802884.44
|
23/06/2016
|
30/06/2016
|
31/10/2018
|
75
|
0.00
|
0
|
28/03/2019
|
|
74
|
IRIDP-2/CDP/DW-12
|
Construction of 2x4.50mx4.50m culvert on Debipur raghunatpur road at ch.850m.
|
IRIDP-2
|
kachua
|
|
|
|
|
18.81
|
M/S. Ahsan Habib Arun
|
16.36
|
|
21/02/2016
|
21/10/2016
|
100
|
|
|
|
|
75
|
IRIDP-2/CDP/DW-13
|
Construction of 3x4.50mx5.0m culvert on Kachua – Raghunatpur GC road – Kachua – Hajigonj R&H (kidp training center) road at ch.350m.
|
IRIDP-2
|
kachua
|
|
|
|
|
25.23
|
M/S. Tahar & Co.
|
21.69
|
|
04/03/2016
|
30/12/2017
|
100
|
|
|
|
|
76
|
IRIDP-2/CDP/DW-14
|
Construction of 2x4.50mx4.50m culvert on Bitara - Bitora purbopara GPS (GPS of West Side) road at ch.850m.
|
IRIDP-2
|
kachua
|
|
|
|
|
18.95
|
M/S. Ahsan Habib Arun
|
16.41
|
|
21/02/2016
|
15/03/2017
|
100
|
|
|
|
|
77
|
IRIDP-2/CDP/DW-15
|
Construction of 2x4.50mx4.50m culvert on Golbahar – Darbeshgang ( Modderbag vill. near house of Sohel ) road at ch.606m.
|
IRIDP-2
|
kachua
|
|
|
|
|
19.04
|
Md. Abu Bakkar Siddik
|
17.14
|
|
15/02/2016
|
15/10/2016
|
100
|
|
|
|
|
78
|
IRIDP-2/CDP/DW-45
|
Improvement of Barothalia bazar - Ashram-Pingra Master bazar- Kumardugi Road (Ch. 6850-7538m & Ch. 7780-8950m)
|
IRIDP-2
|
matlab (dakshin)
|
413963004
|
1.86
|
0.00
|
0
|
10783912.00
|
M/S. Appolo Engineering
|
10578307.00
|
02/03/2016
|
09/03/2016
|
30/04/2019
|
45
|
0.00
|
0
|
28/03/2019
|
|
79
|
IRIDP-2/CDP/DW-7
|
Improvement of Pachgoria-Shahapur Road (ch. 00-1570m)
|
IRIDP-2
|
matlab (dakshin)
|
|
1.50
|
|
|
94.32
|
M/S. National Trade System
|
88.56
|
|
22/02/2016
|
30/03/2017
|
100
|
|
|
|
|
80
|
IRIDP-2/CDP/DW-8
|
Improvement of Gilatali GCCR-Changatali Narayanpur GCC road (ch. 00-530m)
|
IRIDP-2
|
matlab (dakshin)
|
|
0.53
|
|
|
31.03
|
M/S. Farida Enterprise
|
31.01
|
|
02/03/2016
|
30/05/2018
|
100
|
|
|
|
|
81
|
IRIDP-2/CDP/DW-06
|
(a) Improvement of Sengachar GC-Eklashpur GC road (Ch. 5750-8100m)
|
IRIDP-2
|
matlab (uttar)
|
413762004
|
2.35
|
0.00
|
100
|
13945779.00
|
M/S. M.H Bablu
|
13943972.00
|
18/02/2016
|
24/02/2016
|
22/08/2016
|
100
|
9503390.00
|
100
|
28/03/2019
|
|
82
|
IRIDP-2/CDP/DW-1
|
Improvement of Mudafar Bazar-Mudafar Pry. School road (ch. 00-1520m).
|
IRIDP-2
|
matlab (uttar)
|
|
1.50
|
|
|
76.73
|
Md Mizanur Rahman Liton
|
76.63
|
|
15/02/2016
|
22/10/2016
|
100
|
|
|
|
|
83
|
IRIDP-2/CDP/DW-2
|
(a) Improvement of East Lalpur Kheyaghat-Shatnal DC road (ch. 850-2000m) (b) Construction of 0.30mx0.45m culvert at ch.1475m on the same road.
|
IRIDP-2
|
matlab (uttar)
|
|
1.15
|
|
|
55.14
|
Md. Abdul Kader Bapari
|
55.04
|
|
05/03/2016
|
06/11/2016
|
100
|
|
|
|
|
84
|
IRIDP-2/CDP/DW-3
|
Improvement of Uddamdi-Naburkandi Pacca Bridge road (ch. 00-1200m)
|
IRIDP-2
|
matlab (uttar)
|
|
1.20
|
|
|
57.04
|
M/S. Omi Traders
|
56.94
|
|
22/02/2016
|
22/10/2016
|
100
|
|
|
|
|
85
|
IRIDP-2/CDP/DW-4
|
(a)Improvement of Islamia Bazar-Bara Holdia Ainuddin Sha Mazar-Baraholdia Pry. School road (ch. 00-1200m)(b) Construction of 0.30mx0.90m culvert at ch.850m on the same road.
|
IRIDP-2
|
matlab (uttar)
|
|
1.20
|
|
|
56.48
|
M/S. Omi Traders
|
56.38
|
|
22/02/2016
|
22/10/2016
|
100
|
|
|
|
|
86
|
IRIDP-2/CDP/DW-5
|
(a) Improvement of Failakandi (Zia Uddin Mollabari)-Amiakandi road via Failakandi Gov. Pry. School road (ch. 00-1415m)(b) Construction of 04 nos 0.30mx0.875m culvert at ch.180m, 270m, 540m & 1260m on the same road.
|
IRIDP-2
|
matlab (uttar)
|
|
1.41
|
|
|
77.10
|
Md Mizanur Rahman Liton
|
76.91
|
|
24/02/2016
|
23/10/2016
|
100
|
|
|
|
|
87
|
IRIDP-2/CDP/DW-6
|
(a) Improvement of Sengarchar GC-Eklashpur GC road (ch. 5750-8100m)(b) Construction of 3 nos culvert at Ch. 7000m, 7950m & 8090m on the same road.
|
IRIDP-2
|
matlab (uttar)
|
|
2.35
|
|
|
139.46
|
M/S. M.H Bablu
|
139.44
|
|
25/02/2016
|
25/10/2016
|
100
|
|
|
|
|
88
|
IRIDP-2/CDP/DW-33
|
Improvement of Debkora Bazar - Kurkamta via Fatikkhira S.A girls High School Road (Ch.00-2190m)
|
IRIDP-2
|
shahrasti
|
413954101
|
2.19
|
0.00
|
100
|
10498209.00
|
M/S. Harun & Sons
|
9070000.00
|
14/02/2016
|
21/02/2016
|
23/08/2016
|
100
|
6039720.00
|
100
|
28/03/2019
|
|
89
|
e-Tender/NBIDNNGPS/CHA/CHA/2017-2018/W1-00306
|
NIZGASTOLA PRIMARY SCHOOL
|
NBIDNNGPS
|
chandpur-s
|
|
|
|
|
69.03
|
M/S. Contemporary
|
62.12
|
|
03/04/2018
|
10/04/2019
|
0
|
|
|
|
|
90
|
e-Tender/NBIDNNGPS/CHA/CHA/2017-2018/W1-00307
|
UTTAR MOYSHADI PRIMARY SCHOOL
|
NBIDNNGPS
|
chandpur-s
|
|
|
|
|
65.00
|
M/S. Dawn Corporation
|
58.50
|
|
18/04/2018
|
25/04/2019
|
40
|
|
|
|
|
91
|
e-Tender/NBIDNNGPS/CHA/CHA/2017-2018/W1-00387
|
UTTAR PASCHIM BISNUPUR PRIMARY SCHOOL
|
NBIDNNGPS
|
chandpur-s
|
|
|
|
|
68.67
|
M/s. Contemporary
|
61.80
|
|
03/04/2018
|
10/04/2019
|
0
|
|
|
|
|
92
|
e-Tender/NBIDNNGPS/CHA/CHA/2017-2018/W1-00388
|
DAKKHIN KALLANDI REG. PRIMARY SCHOOL
|
NBIDNNGPS
|
chandpur-s
|
|
|
|
|
68.67
|
M/S. Dawn Corporation
|
61.80
|
|
18/04/2018
|
25/04/2019
|
60
|
|
|
|
|
93
|
e-Tender/NBIDNNGPS/CHA/CHA/2017-2018/W1-01646
|
CHAPILA PRIMARY SCHOOL
|
NBIDNNGPS
|
chandpur-s
|
|
|
|
|
52.99
|
M/S Ripon Traders
|
50.34
|
|
03/06/2018
|
10/04/2019
|
0
|
|
|
|
|
94
|
e-Tender/NBIDNNGPS/CHA/CHA/2017-2018/W1-01669
|
MADHA ASHIKATI PRIMARY SCHOOL
|
NBIDNNGPS
|
chandpur-s
|
|
|
|
|
69.42
|
MIZANUR RAHMAN LITON
|
65.95
|
|
14/05/2018
|
20/05/2019
|
75
|
|
|
|
|
95
|
e-Tender/NBIDNNGPS/CHA/CHA/2018-2019/W1-03084
|
DAKKHIN LALPUR SHOHID ZIAUR RAHMAN PRIMARY SCHOOL
|
NBIDNNGPS
|
chandpur-s
|
|
|
|
|
84.01
|
M/S Mridha Enterprise
|
79.81
|
|
|
|
0
|
|
|
|
|
96
|
e-Tender/NBIDNNGPS/CHA/CHA/2018-2019/W1-03085
|
UTTAR RALDIYA REG. PRIMARY SCHOOL
|
NBIDNNGPS
|
chandpur-s
|
|
|
|
|
80.73
|
MD. ABDUL AWAL PATWARY
|
76.70
|
|
|
|
0
|
|
|
|
|
97
|
e-Tender/NBIDNNGPS/CHA/CHA/2018-2019/W1-03086
|
UTTAR SHONAGOW REG. PRIMARY SCHOOL
|
NBIDNNGPS
|
chandpur-s
|
|
|
|
|
61.52
|
M/S. Maa Builders
|
58.45
|
|
|
|
0
|
|
|
|
|
98
|
e-Tender/NBIDNNGPS/CHA/CHA/2018-2019/W1-03087
|
DHAKIN DASHADI GOVT. PRIMARY SCHOOL
|
NBIDNNGPS
|
chandpur-s
|
|
|
|
|
76.89
|
M/S Ananta Traders
|
73.04
|
|
|
|
0
|
|
|
|
|
99
|
e-Tender/NBIDNNGPS/CHA/HAZ/2017-2018/W1-00273
|
SHARASIA GOVT. PRIMARY SCHOOL
|
NBIDNNGPS
|
haziganj
|
|
|
|
|
68.25
|
Md. Akbor Hossain Mridha
|
68.24
|
|
23/04/2018
|
22/04/2019
|
90
|
|
|
|
|
100
|
e-Tender/NBIDNNGPS/CHA/HAZ/2017-2018/W1-01647
|
MENA PUR
|
NBIDNNGPS
|
haziganj
|
|
|
|
|
64.18
|
M/S Unnayan Engineering & Associates
|
60.97
|
|
24/06/2018
|
23/06/2018
|
60
|
|
|
|
|
101
|
e-Tender/NBIDNNGPS/CHA/HAZ/2017-2018/W1-01720
|
SHEHIR CHOW PRIMARY SCHOOL
|
NBIDNNGPS
|
haziganj
|
|
|
|
|
33.35
|
The Royal Enterprise
|
31.68
|
|
24/06/2018
|
23/06/2019
|
92
|
|
|
|
|
102
|
e-Tender/NBIDNNGPS/CHA/MAT/2017-2018/W1-00305
|
UTTAR ACHALA CHILA PRIMARY SCHOOL
|
NBIDNNGPS
|
matlab (dakshin)
|
|
|
|
|
65.00
|
M/S.Aziz Brothers
|
61.41
|
|
29/03/2018
|
31/03/2019
|
70
|
|
|
|
|
103
|
e-Tender/NBIDNNGPS/CHA/MAT/2017-2018/W1-00382
|
MODHABAKRA SHOHID ZIAUR RAHMAN PRIMARY SCHOOL
|
NBIDNNGPS
|
matlab (dakshin)
|
|
|
|
|
69.03
|
M/S.Ripon Traders
|
64.18
|
|
29/03/2018
|
31/03/2019
|
80
|
|
|
|
|
104
|
e-Tender/NBIDNNGPS/CHA/MAT/2017-2018/W1-00448
|
UTTAR DINGABHANGA PRIMARY SCHOOL
|
NBIDNNGPS
|
matlab (dakshin)
|
|
|
|
|
47.07
|
M/S.M.R.S Enterprise
|
44.72
|
|
24/04/2018
|
26/02/2019
|
40
|
|
|
|
|
105
|
e-Tender/NBIDNNGPS/CHA/MAT/2017-2018/W1-00573
|
MASUYAKHAL PRIMARY SCHOOL
|
NBIDNNGPS
|
matlab (dakshin)
|
|
|
|
|
53.77
|
M/S. Mahabub Enterprise
|
51.08
|
|
|
|
10
|
|
|
|
|
106
|
e-Tender/NBIDNNGPS/CHA/MAT/2017-2018/W1-00574
|
CHAR BAYSHPUR SHOHIDZIA PRIMARY SCHOOL
|
NBIDNNGPS
|
matlab (dakshin)
|
|
|
|
|
51.98
|
M/S.Farida Enterprise
|
54.32
|
|
22/04/2018
|
24/02/2019
|
70
|
|
|
|
|
107
|
e-Tender/NBIDNNGPS/CHA/MAT/2017-2018/W1-00583
|
MIDDLE PINGRA REG: PRIMARY SCHOOL
|
NBIDNNGPS
|
matlab (dakshin)
|
|
|
|
|
72.07
|
M/S.Harun & Sons.
|
68.47
|
|
24/04/2018
|
26/04/2019
|
80
|
|
|
|
|
108
|
e-Tender/NBIDNNGPS/CHA/MAT/2017-2018/W1-00584
|
PADUYA PRIMARY SCHOOL
|
NBIDNNGPS
|
matlab (dakshin)
|
|
|
|
|
51.60
|
M/S Mahbub Enterprise
|
49.02
|
|
|
|
0
|
|
|
|
|
109
|
e-Tender/NBIDNNGPS/CHA/MAT/2017-2018/W1-00585
|
SOUTH BAROGOUN REG PRIMARY SCHOOL
|
NBIDNNGPS
|
matlab (dakshin)
|
|
|
|
|
72.03
|
M/S.Farida Enterprise
|
75.27
|
|
22/04/2018
|
24/04/2019
|
60
|
|
|
|
|
110
|
e-Tender/NBIDNNGPS/CHA/MAT/2017-2018/W1-01561
|
DAKHIN BAISHPUR PRIMARY SCHOOL
|
NBIDNNGPS
|
matlab (dakshin)
|
|
|
|
|
57.19
|
M/S. Nasir Enterprise
|
54.33
|
|
03/10/2018
|
06/08/2019
|
0
|
|
|
|
|
111
|
e-Tender/NBIDNNGPS/CHA/MAT/2018-2019/W1-02021
|
UTTAR BHORI PRIMARY SCHOOL
|
NBIDNNGPS
|
matlab (dakshin)
|
|
|
|
|
30.76
|
M/S.Nasir Enterprise
|
29.23
|
|
18/12/2018
|
18/09/2019
|
0
|
|
|
|
|
112
|
e-Tender/NBIDNNGPS/CHA/MAT/2017-2018/W1-00572
|
EAST NUARI GOVT. PRIMARY SCHOOL
|
NBIDNNGPS
|
matlab (uttar)
|
|
|
|
|
69.03
|
M/s Mridha Enterpriae
|
65.58
|
|
27/05/2018
|
04/06/2019
|
85
|
|
|
|
|
113
|
e-Tender/NBIDNNGPS/CHA/MAT/2017-2018/W1-01546
|
UTTAR LUDHUYA PRIMARY SCHOOL
|
NBIDNNGPS
|
matlab (uttar)
|
|
|
|
|
79.98
|
M/s R.K Enterprise
|
78.78
|
|
20/05/2018
|
27/05/2019
|
40
|
|
|
|
|
114
|
e-Tender/NBIDNNGPS/CHA/MAT/2017-2018/W1-01547
|
PATHANCHACK PRIMARY SCHOOL
|
NBIDNNGPS
|
matlab (uttar)
|
|
|
|
|
72.65
|
Mizanur Rahman Liton
|
72.43
|
|
13/05/2018
|
20/05/2019
|
70
|
|
|
|
|
115
|
e-Tender/NBIDNNGPS/CHA/MAT/2017-2018/W1-01549
|
MAIZAKANDI PRIMARY SCHOOL
|
NBIDNNGPS
|
matlab (uttar)
|
|
|
|
|
78.13
|
M/S Irin Enterprise
|
79.30
|
|
27/05/2018
|
04/06/2019
|
30
|
|
|
|
|
116
|
e-Tender/NBIDNNGPS/CHA/MAT/2017-2018/W1-01552
|
CHARLAXMIPUR PRIMARY SCHOOL
|
NBIDNNGPS
|
matlab (uttar)
|
|
|
|
|
71.11
|
M/S Liberty Traders
|
70.69
|
|
21/05/2018
|
28/05/2019
|
70
|
|
|
|
|
117
|
e-Tender/NBIDNNGPS/CHA/MAT/2017-2018/W1-01553
|
MOZLISH-PUR GOVERNMENT P:S:
|
NBIDNNGPS
|
matlab (uttar)
|
|
|
|
|
80.54
|
M/S Liberty Traders
|
76.51
|
|
21/05/2018
|
28/05/2019
|
30
|
|
|
|
|
118
|
e-Tender/NBIDNNGPS/CHA/MAT/2017-2018/W1-01554
|
DAKKHIN RAMPUR PRIMARY SCHOOL
|
NBIDNNGPS
|
matlab (uttar)
|
|
|
|
|
73.97
|
Abdul Kadir Bepary
|
73.52
|
|
08/05/2018
|
15/05/2019
|
50
|
|
|
|
|
119
|
e-Tender/NBIDNNGPS/CHA/MAT/2017-2018/W1-01556
|
RASULPUR GOV. PRIMARY SCHOOL
|
NBIDNNGPS
|
matlab (uttar)
|
|
|
|
|
79.11
|
M/s R.K Enterprise
|
77.92
|
|
20/05/2018
|
27/05/2019
|
25
|
|
|
|
|
120
|
e-Tender/NBIDNNGPS/CHA/MAT/2017-2018/W1-01560
|
HAZIPUR RHH SCHOOL
|
NBIDNNGPS
|
matlab (uttar)
|
|
|
|
|
73.95
|
Abdul Kadir Bepary
|
73.50
|
|
08/05/2018
|
15/05/2019
|
81
|
|
|
|
|
121
|
e-Tender/NBIDNNGPS/CHA/MAT/2017-2018/W1-01567
|
DAKKHIN UDHAMDI PRIMARY SCHOOL
|
NBIDNNGPS
|
matlab (uttar)
|
|
|
|
|
72.48
|
Mizanur Rahman Liton
|
72.44
|
|
13/05/2018
|
20/05/2019
|
85
|
|
|
|
|
122
|
e-Tender/NBIDNNGPS/CHA/MAT/2017-2018/W1-01570
|
MUKTIPOLLY GOVERMANT SCHOOL
|
NBIDNNGPS
|
matlab (uttar)
|
|
|
|
|
81.53
|
M/S M.R Construction
|
79.97
|
|
19/04/2018
|
26/04/2019
|
30
|
|
|
|
|
123
|
e-Tender/NBIDNNGPS/CHA/MAT/2017-2018/W1-01571
|
TUUAR AMIYAPUR DOCTOR MOHOL PRIMARY SCHOOL
|
NBIDNNGPS
|
matlab (uttar)
|
|
|
|
|
82.54
|
M/s Mridha Enterprise
|
78.42
|
|
06/11/2018
|
12/08/2019
|
0
|
|
|
|
|
124
|
e-Tender/NBIDNNGPS/CHA/MAT/2017-2018/W1-01572
|
ANOWARAPUR PRIMARY SCHOOL
|
NBIDNNGPS
|
matlab (uttar)
|
|
|
|
|
74.07
|
M/S Omi Enterprise
|
74.03
|
|
13/05/2018
|
20/05/2019
|
85
|
|
|
|
|
125
|
e-Tender/NBIDNNGPS/CHA/MAT/2017-2018/W1-01573
|
ABUR KANDI PRIMARY SCHOOL
|
NBIDNNGPS
|
matlab (uttar)
|
|
|
|
|
72.29
|
Mizanur Rahman Liton
|
75.38
|
|
13/05/2018
|
20/05/2019
|
90
|
|
|
|
|
126
|
e-Tender/NBIDNNGPS/CHA/MAT/2017-2018/W1-01574
|
DEGHOLIPARA PRIMARY SCHOOL
|
NBIDNNGPS
|
matlab (uttar)
|
|
|
|
|
65.00
|
M/S Gazi Pharmicy
|
62.66
|
|
27/05/2018
|
04/06/2019
|
95
|
|
|
|
|
127
|
e-Tender/NBIDNNGPS/CHA/MAT/2017-2018/W1-01575
|
DAKKHIN GAZIPUR PRIMARY SCHOOL
|
NBIDNNGPS
|
matlab (uttar)
|
|
|
|
|
73.95
|
Abdul Kadir Bepary
|
72.99
|
|
08/05/2018
|
15/05/2019
|
85
|
|
|
|
|
128
|
e-Tender/NBIDNNGPS/CHA/MAT/2017-2018/W1-01578
|
SHIBPUR GOV. PRIMARY SCHOOL
|
NBIDNNGPS
|
matlab (uttar)
|
|
|
|
|
72.48
|
M/S Akkas Construction
|
72.45
|
|
10/05/2018
|
17/05/2019
|
85
|
|
|
|
|
129
|
e-Tender/NBIDNNGPS/CHA/MAT/2017-2018/W1-01657
|
UTTAR MANDARTALI COMMUNITY
|
NBIDNNGPS
|
matlab (uttar)
|
|
|
|
|
70.26
|
Abdul Kadir Bepary
|
67.05
|
|
15/04/2018
|
23/04/2019
|
55
|
|
|
|
|
130
|
e-Tender/NBIDNNGPS/CHA/MAT/2017-2018/W1-01777
|
DAKHIN MATHA BANGHA GOVT.PRY.SCHOOL
|
NBIDNNGPS
|
matlab (uttar)
|
|
|
|
|
30.76
|
Shahar Corporation(Pvt)Ltd
|
29.23
|
|
16/08/2018
|
23/05/2019
|
0
|
|
|
|
|
131
|
e-Tender/NBIDNNGPS/CHA/MAT/2017-2018/W1-01778
|
TATUYA PRIMARY SCHOOL
|
NBIDNNGPS
|
matlab (uttar)
|
|
|
|
|
33.55
|
M/s R.K Enterprise
|
31.87
|
|
26/08/2018
|
01/06/2019
|
10
|
|
|
|
|
132
|
e-Tender/NBIDNNGPS/CHA/MAT/2017-2018/W1-01783
|
CHARKASHIM GOVT. PRIMARY SCHOOL
|
NBIDNNGPS
|
matlab (uttar)
|
|
|
|
|
51.06
|
Fardoush Morshed Ahmed
|
48.51
|
|
15/10/2018
|
21/07/2018
|
0
|
|
|
|
|
133
|
e-Tender/NBIDNNGPS/CHA/SHA/2017-2018/W1-01721
|
KHARIHAR MUKTA PRIMARY SCHOOL
|
NBIDNNGPS
|
shahrasti
|
|
|
|
|
48.68
|
M/S Shaiful Associates
|
44.40
|
|
28/08/2018
|
|
0
|
|
|
|
|
134
|
e-Tender/NBIDNNGPS/CHA/SHA/2017-2018/W1-01740
|
GHORIMONDAL REG. PRIMARY SCHOOL
|
NBIDNNGPS
|
shahrasti
|
|
|
|
|
36.80
|
Mizanur Rahman
|
34.96
|
|
11/06/2018
|
15/03/2019
|
48
|
|
|
|
|
135
|
e-Tender/NBIDNNGPS/CHA/SHA/2017-2018/W1-01741
|
PIR SHAH SHARIF REG. PRIMARY SCHOOL
|
NBIDNNGPS
|
shahrasti
|
|
|
|
|
36.80
|
M/S Patwary & Sons
|
34.96
|
|
11/06/2018
|
15/03/2019
|
48
|
|
|
|
|
136
|
CW-10(a1)/RCIP/CDP
|
1.Improvement of Faridganj GC-Rupsha GC Road. (Road ID413452001, Upazila: Faridganj, District: Chandpur) 2.Improvement of Purbo subidpur UP to Basara Bazar Road. Via Munshir Hat Bazar (Road ID413453035, Upazila: Faridganj, District: Chandpur)
|
RCIP
|
faridganj
|
|
10.34
|
0.00
|
54
|
1394.19
|
M/S. Shahid Brothers & M/S. Contemporary,Merul,Badda,Dhaka-1212.
|
1673.65
|
05/04/2020
|
12/04/2020
|
27/07/2022
|
70
|
906.02
|
54
|
31/08/2023
|
|
137
|
CW-10(a2)/RCIP/CDP
|
Improvement of Gazipur UP Office to Upazilla Head Quarter (Road ID413473011, Upazila: Haimchor, District: Chandpur)
|
RCIP
|
haimchar
|
413473011
|
3.11
|
0.00
|
61
|
396.57
|
KE-AB (JV),North Algi,Algi Bazar,Haimchar,Chandpur.
|
340.60
|
24/03/2020
|
01/04/2020
|
16/07/2022
|
100
|
206.83
|
61
|
31/08/2023
|
|
138
|
CW-10(b1)/RCIP/CDP
|
Improvement of Cheangatali GC (Dadasgram up)-Dhadda-Khalpar bazar Road via Shaheb bazar & Pirojpur Bazar (Road ID413493015, Upazila: Hazigonj, District: Chandpur) 2. Improvement of Chioshi (E) UP Office-Kharihor Bazar road via Kadra bazar (Road ID413953010, Upazila: Shahrasti, District: Chandpur)
|
RCIP
|
haziganj
|
413493015
|
12.24
|
0.00
|
27
|
1492.59
|
MRC-MI JV ,147 Motijheel C/A ,Dhaka-1000.
|
1714.67
|
16/08/2020
|
23/08/2020
|
24/11/2022
|
53
|
469.99
|
27
|
31/08/2023
|
|
139
|
CW-10(b2)/RCIP/CDP
|
Improvement of Kachua North UP (Tetuya)-Loskari-Boxagonj bazar road via Duati (Road ID413583023, Upazila: Kachua, District: Chandpur)
|
RCIP
|
kachua
|
413583023
|
6.60
|
0.00
|
19
|
871.81
|
Mam-Shams-Moon JV,Sattara Center (9th Floor),Nayapaltan,Dhaka-1000.
|
1026.00
|
05/04/2020
|
12/04/2020
|
25/07/2022
|
38
|
195.27
|
19
|
31/08/2023
|
|
140
|
CW-10(a3)/RCIP/CDP
|
Improvement of Dakshin Nayergaon UP-Ashinpur-Aliara Road (Road ID413963003, Upazila: Matlab South , District: Chandpur)
|
RCIP
|
matlab (dakshin)
|
413963003
|
6.27
|
0.00
|
96
|
636.95
|
MJA-MHS (JV),Gobindia,Horina Bazar,Sadar,Chandpur.
|
738.63
|
05/04/2020
|
12/04/2020
|
30/05/2022
|
100
|
647.68
|
96
|
31/08/2023
|
|
141
|
RERMP-3/CH AND/W-56
|
Maintenance of Rural
Roads Chandpur()
|
RERMP-3
|
chandpur-s
|
N/A
|
|
|
36
|
3248.50
|
N/A
|
3248.50
|
|
|
|
40
|
1182.00
|
36
|
26/12/2021
|
|
142
|
RIDP(CBC)/Ch-M149 (Road ID: 413223012)
|
Periodic Maintenance (Overlay) of Mohamaya GC to Lodergong Algi Bazar Road ID No. 413223012 from Ch.00 to 1025m
|
RIDP-CBC
|
chandpur-s
|
|
1.03
|
|
|
21.17
|
M/S. Patwary Construction
|
20.95
|
|
18/02/2018
|
25/10/2018
|
90
|
|
|
|
|
143
|
RIDP(CBC)/Ch-W80 ID: 413223021
|
Improvement of Bishnupur UP-Munshirhat road Via Kherudia (Ch. 1808-2896m) under Chandpur Sadar Upazila, Chandpur
|
RIDP-CBC
|
chandpur-s
|
|
1.09
|
|
|
45.80
|
M/S. Banizik Songastha
|
43.58
|
|
17/01/2016
|
24/07/2016
|
100
|
|
|
|
|
144
|
RIDP(CBC)/Ch-W115 ID:413223017 ID. 413223022
|
1) Improvement of Balia UP- Gulisha, Modna- Chandra road ( Ch. 2000-2840m, 2) Improvement of Korer Dokan ( Dhalir ghat) - Balia road ( Ch.000-500m,
|
RIDP-CBC
|
chandpur-s
|
|
1.34
|
|
|
88.30
|
M/S Patwary Construction
|
83.80
|
|
05/10/2016
|
12/06/2017
|
100
|
|
|
|
|
145
|
RIDP(CBC)/Ch-W118 ID:413224069
|
Improvement of Horina Frryghat-Hanarchar UP road ( Ch. 580-1500m)
|
RIDP-CBC
|
chandpur-s
|
|
0.92
|
|
|
45.23
|
M/S. Harun & Sons
|
45.21
|
|
07/10/2016
|
15/02/2018
|
100
|
|
|
|
|
146
|
RIDP(CBC)/Ch-W117 ID:413223006
|
Improvement of Chandra UP-Balia GC road ( Ch. 2000-3000m)
|
RIDP-CBC
|
chandpur-s
|
|
1.00
|
|
|
50.56
|
M/S. Aboni Traders
|
50.51
|
|
06/10/2016
|
30/06/2017
|
100
|
|
|
|
|
147
|
RIDP(CBC)/Ch-W30 Road ID: 413224021
|
Improvement of Chankar Dokan-Shahatoli Collage Road road (Ch. 750-1250m) Tender ID No. 19582
|
RIDP-CBC
|
chandpur-s
|
|
0.50
|
|
|
22.47
|
Md Jahangir Alam
|
20.00
|
|
25/05/2015
|
14/02/2016
|
100
|
|
|
|
|
148
|
RIDP(CBC)/Ch-W31 Road ID: 413224100
|
Improvement of Chankar Dokan-Pingra-Hossinpur Primary School Road (Ch. 00-750m) Tender ID No. 19583
|
RIDP-CBC
|
chandpur-s
|
|
0.75
|
|
|
35.51
|
M/S. Sayem Trade International
|
32.60
|
|
16/08/2015
|
30/11/2016
|
100
|
|
|
|
|
149
|
RIDP(CBC)/Ch-W41 Road ID: 413224037
|
Improvement of Dhalirghat-North Ichali road (Ch. 00-500m) Tender ID No. 33709
|
RIDP-CBC
|
chandpur-s
|
|
0.50
|
|
|
22.25
|
M/S. Applo Enginering & Construction
|
19.31
|
|
31/01/2016
|
30/06/2017
|
100
|
|
|
|
|
150
|
RIDP(CBC)/Ch-W39 Road ID: 413225078
|
Improvement of Kamranga Bazar-Gudaraghat road (Ch. 00-770m) Tender ID No.21564
|
RIDP-CBC
|
chandpur-s
|
|
0.77
|
|
|
35.02
|
M/S. Aziz and Brothers
|
33.06
|
|
15/06/2015
|
04/03/2016
|
100
|
|
|
|
|
151
|
RIDP(CBC)/Ch-W40 Road ID: 413225075
|
Improvement of Jabbar dhalir dokan to Baksillya road (Ch. 00-500m) Tender ID No. 21566
|
RIDP-CBC
|
chandpur-s
|
|
0.50
|
|
|
33.50
|
M/S. Amena International
|
31.49
|
|
03/08/2015
|
10/02/2016
|
100
|
|
|
|
|
152
|
RIDP(CBC)/Ch-W65 Road ID: 413225032
|
(a) Improvement of Baharia-Ramdasdi road from Ch. 00-500m ID No. 27829 (b) Construction of 2x4.50x3.00m RCC Box Culvert on Same road at Ch. 475m
|
RIDP-CBC
|
chandpur-s
|
|
0.50
|
|
|
42.28
|
M/S. Khan Enterprise
|
37.75
|
|
08/10/2015
|
11/04/2016
|
100
|
|
|
|
|
153
|
RIDP(CBC)/Ch-W-70 Road ID: 413225099
|
Improvement of Rampur Siddiqia Etimkhana & Hafizia Madrasha road from (Ch. 00-195m) ID No. 31491
|
RIDP-CBC
|
chandpur-s
|
|
0.20
|
|
|
9.62
|
M/S. Fatema Enterprise
|
9.61
|
|
15/12/2015
|
27/11/2016
|
100
|
|
|
|
|
154
|
RIDP(CBC)/Ch-W79 Road ID: 413225049
|
Improvement of Kumardugi to Ketua (Master Bazar) road (Ch. 384-1800m) ID No. 36269
|
RIDP-CBC
|
chandpur-s
|
|
1.46
|
|
|
62.51
|
Mr. Giash Uddin Prodan
|
62.26
|
|
07/02/2016
|
14/08/2016
|
70
|
|
|
|
|
155
|
RIDP(CBC)/Ch.W-124 ID No. 413225008
|
Improvement of Hosenpur- Paikasta Kazi Bari Road [Ch.1420 - 1920m,
|
RIDP-CBC
|
chandpur-s
|
|
0.50
|
|
|
35.33
|
M/S. Shyam Trade International
|
34.27
|
|
11/12/2016
|
15/08/2017
|
100
|
|
|
|
|
156
|
RIDP(CBC)/Ch.W-125 ID No. 413224040
|
Improvement of Bagadi-Bramman Sakhua Rd (Ch.00 - 500m and 1500 -1960m
|
RIDP-CBC
|
chandpur-s
|
|
0.50
|
|
|
55.47
|
M/S. Jahangir Enterprise
|
51.71
|
|
27/11/2016
|
04/08/2017
|
100
|
|
|
|
|
157
|
RIDP(CBC)/Ch.W-127 ID No. 413225039
|
Improvement of Babur hat - Taltala road - Shahatali Feeder road(Ch.335 - 835m,
|
RIDP-CBC
|
chandpur-s
|
|
0.50
|
|
|
30.44
|
M/S. Shyam Trade International
|
29.52
|
|
11/12/2016
|
01/09/2017
|
100
|
|
|
|
|
158
|
RIDP(CBC)/Ch.W-128 ID No. 413224093
|
Improvement of Laxmipur -Balia road to Harina road [Ch.500 - 943m,
|
RIDP-CBC
|
chandpur-s
|
|
0.44
|
|
|
23.52
|
M/S. Nasir Enterprise
|
23.28
|
|
24/11/2016
|
01/08/2017
|
100
|
|
|
|
|
159
|
RIDP(CBC)/Ch.W-130 ID No. 413224048
|
a) Improvement of Raldia-Matlab Road (Ch.00 - 500m, ID No. 413225006) under Chandpur-sadar Upazila, Dist. Chandpur and b) Improvement of Kamranga-Maheshpur Rd (Ch.00 - 500m, ID No. 413224048)
|
RIDP-CBC
|
chandpur-s
|
|
0.50
|
|
|
59.70
|
M/S. A. H Trading Corporation
|
56.12
|
|
18/12/2016
|
12/10/2017
|
100
|
|
|
|
|
160
|
RIDP(CBC)/Ch.W-157 ID No. 413225076
|
Improvement of Amanullahpur Prymary school road including Umma Al-Ragdadi Mosque road from Ch. 400m to 900m and Road ID No. 413225076 under Chandpur sadar upazila, Dist. Chandpur.
|
RIDP-CBC
|
chandpur-s
|
|
0.50
|
|
|
37.24
|
Md. Habibullah Seikh
|
37.19
|
|
08/08/2017
|
14/04/2018
|
100
|
|
|
|
|
161
|
RIDP(CBC)/Ch-W194 ID No 413224024
|
Construction of 1x4.50x4.50m RCC Culvert at ch.1415m on Mandari to Shahmahmudpur U.P. Road
|
RIDP-CBC
|
chandpur-s
|
|
|
|
|
15.52
|
M/S. Ripon Traders
|
13.97
|
|
12/04/2018
|
17/12/2018
|
100
|
|
|
|
|
162
|
RIDP(CBC)/Ch-W63 Road ID: 413224094
|
(a) Improvement of Sreerampur-Bara Laxmipur road from Ch. 00-500m Id No. 27827 (b) Improvement of Kamalapur-Balia road from Ch. 740-840m
|
RIDP-CBC
|
chandpur-s
|
|
0.60
|
|
|
30.10
|
M/S. Khan Enterprise
|
26.98
|
|
08/10/2015
|
|
60
|
|
|
|
|
163
|
RIDP(CBC)/Ch-W64 Road ID: 413224093
|
Improvement of Laxmipur-Harina road via Aksha Jama Mosque road from Ch. 00-500m ID No. 27828
|
RIDP-CBC
|
chandpur-s
|
|
0.50
|
|
|
27.18
|
M/S. Khan Enterprise
|
24.26
|
|
08/10/2015
|
|
60
|
|
|
|
|
164
|
RIDP(CBC)/Ch.W-123 ID No. 413225007)
|
Improvement of Hapania-National High Way Road (Ch.00 - 900m,
|
RIDP-CBC
|
chandpur-s
|
|
0.90
|
|
|
56.33
|
Md Afzal Hossain
|
52.88
|
|
11/12/2016
|
15/08/2017
|
0
|
|
|
|
|
165
|
RIDP(CBC)/Ch.W-126 ID No. 413225037
|
Improvement of Gagirhat - West Dasadi govt.Pry. School (Ch.00 - 1030m,
|
RIDP-CBC
|
chandpur-s
|
|
1.03
|
|
|
59.19
|
Md Mizanur Rahman Liton
|
57.99
|
|
17/01/2017
|
24/09/2017
|
10
|
|
|
|
|
166
|
RIDP(CBC)/Ch.W-129 ID No. 413225067
|
Improvement of B.T. road (Rice Mill) - Lal Miah Talukder house Road (Ch.00 - 745m,
|
RIDP-CBC
|
chandpur-s
|
|
0.75
|
|
|
34.12
|
M/S. S.Q Trade International
|
33.87
|
|
07/03/2017
|
06/11/2017
|
40
|
|
|
|
|
167
|
RIDP(CBC)/Ch.W-131 ID No. 413224094
|
Improvement of Sreerampur Arajibalia road to Baralaxmipur road [Ch.500 - 875m, I
|
RIDP-CBC
|
chandpur-s
|
|
0.38
|
|
|
19.67
|
M/S. Arifa Enterprise
|
19.62
|
|
08/12/2016
|
07/08/2017
|
50
|
|
|
|
|
168
|
RIDP(CBC)/Ch.W-158 ID No. 413225082
|
Improvement of Charbakila to Madhu road from Ch. 00m to 785m and
|
RIDP-CBC
|
chandpur-s
|
|
0.79
|
|
|
44.14
|
A.H Trading Corporation
|
44.09
|
|
28/05/2017
|
27/01/2018
|
70
|
|
|
|
|
169
|
RIDP(CBC)/Ch-W193 ID No 413224098
|
Improvement of Modina Bazar to janata Bazar Road from Ch. 00 to 1530m
|
RIDP-CBC
|
chandpur-s
|
|
1.53
|
|
|
102.73
|
M/S. Nasir Enterprise
|
101.98
|
|
28/04/2018
|
04/12/2018
|
35
|
|
|
|
|
170
|
RIDP(CBC)/Ch-W147
|
Improvement of Rupsha bazar GC-Kalir bazar GC Road (Ch. 5050-6580m)
|
RIDP-CBC
|
faridganj
|
413452011
|
1.53
|
0.00
|
0
|
11214662.00
|
0
|
0.00
|
|
|
|
0
|
|
0
|
01/02/2017
|
|
171
|
RIDP(CBC)/Ch-M42
|
Re Construction of 39m Long RCC Girder Bridge on Rupsha GC-Palihar GC road at near Kamta Bazar at Ch. 9300m ID No. 32505
|
RIDP-CBC
|
faridganj
|
413452006
|
|
0.00
|
0
|
26377397.00
|
Md Younus & Brothers Pvt
|
20587864.00
|
03/01/2016
|
03/01/2016
|
10/06/2017
|
10
|
0.00
|
0
|
01/02/2017
|
|
172
|
RIDP(CBC)/Ch-M22 ID: 413453001
|
Periodic Maintenance of Faridgonj-Kamta Bazar (Ch. 00-2500m) Tender ID No. 17827
|
RIDP-CBC
|
faridganj
|
|
2.50
|
|
|
65.02
|
M/S. Khan Enterprise
|
51.70
|
|
05/04/2015
|
06/02/2016
|
100
|
|
|
|
|
173
|
RIDP(CBC)/Ch-M50 ID:413453005.
|
Periodic Maintenance (Overlay) of Uttar Rupsha UP (Rupsha GC)-Moulobi bazar Road (Ch. 00-2000m) (ID No. 36216)
|
RIDP-CBC
|
faridganj
|
|
2.00
|
|
|
56.13
|
H.S Enterprise
|
47.98
|
|
04/02/2016
|
10/08/2016
|
100
|
|
|
|
|
174
|
RIDP(CBC)/Ch-M123 ID: 413453029.
|
Periodic Maintenance (Overlay) of Dakshin Rupsha UP (Gridakalindia)Kaonia Bazar roaf via Badarpur, Rustompur Bazar (Ch. 00-500m)
|
RIDP-CBC
|
faridganj
|
|
0.50
|
|
|
10.52
|
M/S. Contemporary
|
9.77
|
|
07/05/2017
|
06/01/2018
|
100
|
|
|
|
|
175
|
RIDP(CBC)/Ch-M153 ID No 413453003
|
Periodic Maintenance (Overlay) of Dhanua Bazar RHD to Gollak bazar Road via Dakshin Paikpara UP Office Road from Ch.11780 to13614m
|
RIDP-CBC
|
faridganj
|
|
1.83
|
|
|
37.00
|
M/S. Mahbub Enterprise
|
39.92
|
|
19/07/2018
|
25/03/2018
|
100
|
|
|
|
|
176
|
RIDP(CBC)/Ch-M21 ID 413452006
|
Periodic Maintenance of Rupsha GC-Palishara GC (Hazigonj) (Ch. 00-2300m) Tender ID No. 17826
|
RIDP-CBC
|
faridganj
|
|
2.30
|
|
|
70.00
|
M/S. Unnyan Enginnering
|
56.04
|
|
09/04/2015
|
16/11/2015
|
100
|
|
|
|
|
177
|
RIDP(CBC)/Ch-M42 ID: 413452006
|
Re Construction of 39m Long RCC Girder Bridge on Rupsha GC-Palishar GC road at near Kamta Bazar at Ch. 9300m ID No. 32505
|
RIDP-CBC
|
faridganj
|
|
|
|
|
263.77
|
Md Younus & Brothers Pvt
|
205.88
|
|
03/01/2016
|
10/06/2017
|
35
|
|
|
|
|
178
|
RIDP(CBC)/Ch-W81 ID: 413452011
|
Improvement of Rupsha bazar GC-Kalir bazar GC Road (Ch. 2190-3300m)
|
RIDP-CBC
|
faridganj
|
|
1.11
|
|
|
80.22
|
M/S. Ananto Traders
|
80.19
|
|
25/01/2016
|
31/07/2016
|
100
|
|
|
|
|
179
|
RIDP(CBC)/Ch-W147 ID: 413452011
|
Improvement of Rupsha bazar GC-Kalir bazar GC Road (Ch. 5050-6580m)
|
RIDP-CBC
|
faridganj
|
|
1.53
|
|
|
112.15
|
M/S. H.S Enterprise
|
109.91
|
|
09/03/2017
|
03/01/2018
|
100
|
|
|
|
|
180
|
RIDP(CBC)/Ch-W187 ID. 413452013
|
Improvement of Tugbi RHD to Chandra GC from Ch.1000 to 1900m
|
RIDP-CBC
|
faridganj
|
|
0.90
|
|
|
65.79
|
M/S. Hazi Jamal Enterpri
|
63.62
|
|
06/02/2018
|
12/10/2018
|
100
|
|
|
|
|
181
|
RIDP(CBC)/Ch-W113 ID No.413455242 ID No. 413455250
|
(a) Improvement of 12 No Chardhukia Khalpar-Ak Goumbos Mosque Raypur road Via Bongobondo Shomaj Shaba Office road from (Ch. 00-500m) (b) Improvement of Balithoba Mia bari-Dorgoan road from (Ch. 00-630m) ID No. 58069
|
RIDP-CBC
|
faridganj
|
|
1.13
|
|
|
53.08
|
M/S. Arifa Enterprise
|
49.03
|
|
20/07/2016
|
27/03/2017
|
100
|
|
|
|
|
182
|
RIDP(CBC)/Ch.RM-13
|
Improvement of Munshirhat/Growth Center
|
RIDP-CBC
|
faridganj
|
|
|
|
|
30.63
|
M/S. National Trade System
|
30.58
|
|
28/03/2017
|
05/12/2017
|
100
|
|
|
|
|
183
|
RIDP(CBC)/Ch-W18 Road ID: 413453005
|
Improvement of Rupsha UP(Rupsha GC) Mowlovi Bazar Road (Ch. 4200-5050m) Tender ID No. 18801
|
RIDP-CBC
|
faridganj
|
|
0.85
|
|
|
51.10
|
M/S. Hazi Jamal Enterpri
|
43.68
|
|
24/05/2015
|
25/10/2016
|
100
|
|
|
|
|
184
|
RIDP(CBC)/Ch-W52 ID: 413453020
|
Improvement of Dakshin Gobindapur UP (Goalbar bazar)-Horipur bazar Road (Ch. 00-600m) ID No. 25616
|
RIDP-CBC
|
faridganj
|
|
0.60
|
|
|
35.37
|
M/S. Unnyan Engineeris & Assio.
|
29.71
|
|
09/09/2015
|
30/10/2016
|
100
|
|
|
|
|
185
|
RIDP(CBC)/Ch-W162 ID No.413453002
|
Improvement of Faridgonj to Goalbour Road from Ch.4150m to 5000m
|
RIDP-CBC
|
faridganj
|
|
0.85
|
|
|
51.96
|
M/S. Shafiq Enterprise
|
519.00
|
|
19/06/2017
|
25/02/2018
|
100
|
|
|
|
|
186
|
RIDP(CBC)/Ch-W19 Road ID: 413453002
|
Improvement of Faridgonj-Gowalvoar Bazar Road (Ch. 3650-4150m) Tender ID No. 18802
|
RIDP-CBC
|
faridganj
|
|
0.50
|
|
|
27.43
|
Md. Immam Hossain
|
23.24
|
|
26/04/2015
|
12/03/2016
|
60
|
|
|
|
|
187
|
RIDP(CBC)/Ch-W159 ID No.413453013
|
Improvement of Purba Gupti UP Gollakbazar to Anando bazar via laxmipur Road from Ch.000m to 810m
|
RIDP-CBC
|
faridganj
|
|
0.81
|
|
|
56.59
|
M/S. Contamporary
|
59.34
|
|
18/10/2017
|
24/06/2018
|
80
|
|
|
|
|
188
|
RIDP(CBC)/Ch-W160 ID No.413453021
|
Improvement of Paschim Chardukhia UP Chowmohoni bazar-Bepari bazar Road from Ch.350m to 950m
|
RIDP-CBC
|
faridganj
|
|
0.60
|
|
|
40.40
|
M/S. Ananto Traders
|
40.36
|
|
11/06/2017
|
17/02/2018
|
60
|
|
|
|
|
189
|
RIDP(CBC)/Ch-W161 ID No.413453035
|
Improvement of Pashim subidpur UP to Basara Bazar Road Via Munshir Hat from Ch.1500m to 2200m
|
RIDP-CBC
|
faridganj
|
|
0.70
|
|
|
41.94
|
M/S. Tanim Traders
|
41.10
|
|
09/08/2017
|
14/04/2018
|
60
|
|
|
|
|
190
|
RIDP(CBC)/Ch-BW15 ID No.413453009
|
Construction of 36.00m long RCC Girder Bridge on Purba Gupti UP (Gollak) to Fakir bazar Road (
|
RIDP-CBC
|
faridganj
|
|
|
|
|
224.79
|
M/S. Aziz & Brothers
|
216.00
|
|
24/09/2017
|
01/03/2019
|
33
|
|
|
|
|
191
|
RIDP(CBC)/Ch-W20 Road ID: 413455168
|
Improvement of Paikpara Samsul Hoque Chowdhary Bari-Paikpara Gowalbari Road (Ch. 00-775m) Tender ID No. 18803
|
RIDP-CBC
|
faridganj
|
|
0.78
|
|
|
34.55
|
M/S. Hazi Jamal Enterpri
|
27.91
|
|
12/05/2015
|
26/03/2016
|
100
|
|
|
|
|
192
|
RIDP(CBC)/Ch-W44 Road ID: 413454062
|
Improvement of Nayarhat Bazar ((9no UP) Charmathura Charragobari-Lamchar-Gowalbour road (Ch. 1000-1500m) ID No. 22663
|
RIDP-CBC
|
faridganj
|
|
0.50
|
|
|
27.36
|
M/S. Arifa Enterprise
|
22.99
|
|
08/06/2015
|
03/12/2015
|
100
|
|
|
|
|
193
|
RIDP(CBC)/Ch-W45 Road ID: 413455015
|
Improvement of Nowapara-Sholodana Road (Ch.00-500m) ID No. 22664
|
RIDP-CBC
|
faridganj
|
|
0.50
|
|
|
23.29
|
M/S. Unnyan Engineeris & Assio.
|
19.45
|
|
17/06/2015
|
16/07/2016
|
100
|
|
|
|
|
194
|
RIDP(CBC)/ Ch-W58 Road ID: 413455241
|
Improvement of CIP Bari Bandh Kharkhadia GPS-Ashraful Ullum Madrasha road (Ch. 00-1300m) ID No. 27212
|
RIDP-CBC
|
faridganj
|
|
1.30
|
|
|
59.84
|
M/S. Unnyan Engineeris & Assio.
|
59.78
|
|
09/09/2015
|
14/03/2016
|
100
|
|
|
|
|
195
|
RIDP(CBC)/Ch-SW26 Road ID 413454066
|
Improvement of Krishnapur CIP Embankment - Daskhin Balithuba Pir Shaheb bari road ( Daskhin Balithuba boro Bari to Mizi bari) road ( Ch. 2000 - 3050 m,
|
RIDP-CBC
|
faridganj
|
|
1.05
|
|
|
52.76
|
M/S. Arifa Enterprise
|
52.22
|
|
20/07/2016
|
30/06/2017
|
100
|
|
|
|
|
196
|
RIDP(CBC)/Ch-W89 ID: 413455019
|
Improvement of Shontospur-Shollakhali road via west Eklashpur Patwary Bari-Abdul Bapari GPS road (Ch. 400-970m) ID No. 39858
|
RIDP-CBC
|
faridganj
|
|
0.57
|
|
|
33.58
|
Applo Enginering & Construction Ltd
|
29.47
|
|
28/02/2016
|
30/12/2017
|
100
|
|
|
|
|
197
|
RIDP(CBC)/Ch-W33 ID: 413455061
|
Improvement of Faridgonj Chandra-Modonergaon Khasherbari road (Ch. 00-500m) Tender ID No. 19585
|
RIDP-CBC
|
faridganj
|
|
0.50
|
|
|
22.92
|
M/S. Unnyan Engineer & Assiocate
|
22.90
|
|
15/05/2015
|
28/03/2016
|
100
|
|
|
|
|
198
|
RIDP(CBC)/Ch-W-68 ID: 413454019
|
Improvement of R&H Sovan Bazar-Joyganj road via Nayahat Bazar road from (Ch. 1000-1500m) ID No. 31489
|
RIDP-CBC
|
faridganj
|
|
0.50
|
|
|
27.36
|
M/S. Alif Enterprise
|
23.65
|
|
17/12/2015
|
28/02/2017
|
100
|
|
|
|
|
199
|
RIDP(CBC)/Ch-W-69 ID: 413454013
|
Improvement of Ruderganj-Joyganj road from (Ch. 00-800m) ID No. 31490
|
RIDP-CBC
|
faridganj
|
|
0.80
|
|
|
39.50
|
M/S. Raton Patwary Traders
|
31.32
|
|
06/12/2015
|
30/11/2016
|
100
|
|
|
|
|
200
|
RIDP(CBC)/Ch-W71 ID: 413455065
|
Improvement of CIP Baribad-Subidpur road from (Ch. 00-500m) ID No 33705
|
RIDP-CBC
|
faridganj
|
|
0.50
|
|
|
22.81
|
M/S. Arifa Enterprise
|
19.39
|
|
05/01/2016
|
12/07/2016
|
100
|
|
|
|
|
201
|
RIDP(CBC)/Ch-W72 ID: 413454070
|
Improvement of Faridgonj-Chandra GC road (mennutia Jame Mosque)-Modonergoan Road from (Ch. 00-500m) ID No. 33706
|
RIDP-CBC
|
faridganj
|
|
0.50
|
|
|
22.99
|
M/S. Contamporary
|
19.88
|
|
03/01/2016
|
10/07/2016
|
100
|
|
|
|
|
202
|
RIDP(CBC)/Ch-W111 ID: 413454047
|
(a) Improvement of Sontoshpur Shollakhali road via West Eklashpur Mollah Bari Jamee Mosque-Abul Bapari GPS road from Ch. 1450-2120m (b) Improvement of Gazipur Gollak road-Votal Asta road from (Ch. 400-900m)
|
RIDP-CBC
|
faridganj
|
|
1.17
|
|
|
46.58
|
M/S. Hazi Jamal Enterpri
|
57.45
|
|
20/12/2016
|
28/08/2017
|
100
|
|
|
|
|
203
|
RIDP(CBC)/Ch-W112 ID: 413455245
|
(a) Improvement of Barir Bazar-Bishkatali road from Ch. 00-500m (b) Improvement of Janata Bazar-Mize Bari road Via Ahad Ali High School Road from Ch. 00-1042m ID No. 58068
|
RIDP-CBC
|
faridganj
|
|
1.54
|
|
|
73.01
|
M/S. Alif Enterprise
|
67.12
|
|
19/07/2016
|
14/05/2017
|
100
|
|
|
|
|
204
|
RIDP(CBC)/Ch-W116 ID 413454073, 413454062
|
a) Improvement of Paltaluk Mizi bari - Upadic Barkantaj bari road via Upadic Govt. Primary School road ( Ch.000-700m. b) Improvement of Nayerhat Bazar ( 9 no UP) Charmathura Char ragobrai - Lamchar - Gowalvour road ( Ch.1500-2250 m,
|
RIDP-CBC
|
faridganj
|
|
1.45
|
|
|
78.49
|
M/S. Ananto Traders
|
70.28
|
|
01/08/2016
|
06/05/2017
|
100
|
|
|
|
|
205
|
RIDP(CBC)/Ch-SW27 ID No. 413455280
|
mprovement of Gazipur Beri Bandh - Gollak road via Gazibari road ( Ch.000-580m,
|
RIDP-CBC
|
faridganj
|
|
0.58
|
|
|
27.57
|
M/S. Ananto Traders
|
24.67
|
|
01/08/2016
|
31/03/2017
|
100
|
|
|
|
|
206
|
RIDP(CBC)/Ch-SW28 ID 413455275)
|
Improvement of Faridgonj GC - South Rajapur Govt. Primary School road ( Ch.000-1120m,
|
RIDP-CBC
|
faridganj
|
|
1.12
|
|
|
59.02
|
M/S. Ananto Traders
|
52.52
|
|
01/08/2016
|
31/03/2017
|
100
|
|
|
|
|
207
|
RIDP(CBC)/Ch-W93 ID: 413455199
|
Improvement of Khayaghat-ShollaKhali Mannan Mize Bari Road (Ch. 00-1050m) ID No. 43763
|
RIDP-CBC
|
faridganj
|
|
1.05
|
|
|
58.85
|
Applo Enginering & Construction Ltd
|
52.63
|
|
02/03/2016
|
|
100
|
|
|
|
|
208
|
RIDP(CBC)/Ch-W153 ID 413455168
|
Improvement of Paikpara Samsul Hoque Chowdhary Bari mor-Noyani via Kashara Madrasha road ( Ch.775-1652m,
|
RIDP-CBC
|
faridganj
|
|
0.85
|
|
|
54.56
|
M/S. Unnyan Engineering Assiociats
|
54.40
|
|
20/03/2017
|
27/11/2017
|
100
|
|
|
|
|
209
|
RIDP(CBC)/Ch.W197 ID No 413455065
|
Improvement of CIP Embankment to Subidpur Road via Diamoddhi Patwary Bari from Ch.500 to 1490m
|
RIDP-CBC
|
faridganj
|
|
0.99
|
|
|
68.27
|
M/S. Ananto Traders
|
67.86
|
|
04/04/2018
|
11/12/2018
|
100
|
|
|
|
|
210
|
RIDP(CBC)/Ch-W188 ID No. 413455073 ID 413454024
|
a) Improvement of Ghania RHD to Manori primari School Road via Hujur Bari from Ch.1220 to 1775m under Faridgonj Upazila Dist. Chandpur. b) Improvement of Gridakalindia to Kawnia Madrasa Road from Ch.1380 to 1745m
|
RIDP-CBC
|
faridganj
|
|
0.95
|
|
|
65.65
|
M/S. Mahabub Enterprise
|
61.58
|
|
04/02/2018
|
10/10/2018
|
100
|
|
|
|
|
211
|
RIDP(CBC)/Ch.W190 ID No. 413455158
|
Improvement of Kashara Mizi bari to Kashara Noyani Bari Road from Ch. 00 to 1100m
|
RIDP-CBC
|
faridganj
|
|
1.10
|
|
|
72.15
|
M/S. Arifa Enterprise
|
70.50
|
|
08/03/2018
|
14/11/2018
|
100
|
|
|
|
|
212
|
RIDP(CBC)/Ch-SW35 Road ID: 413455274
|
Improvement of Sontoshpur Bapari Bazar to Ali Patwary Bari Via Shontospur pir Shaheb Bari road from Ch. 00-1150m
|
RIDP-CBC
|
faridganj
|
|
1.15
|
|
|
55.37
|
M/S. Hi-Tech Enterprise
|
55.27
|
|
27/03/2017
|
04/12/2017
|
65
|
|
|
|
|
213
|
RIDP(CBC)/Ch-W168 Road ID 413454065
|
Improvement of Manori to Montala road from Ch. 2324 to 4200m a
|
RIDP-CBC
|
faridganj
|
|
1.88
|
|
|
91.67
|
M/S. Gulshan International
|
90.52
|
|
26/10/2017
|
26/06/2018
|
60
|
|
|
|
|
214
|
RIDP(CBC)/Ch-W189 ID No. 413455030 ID No. 413454042 ID No. 413454068
|
a) Improvement of Laxmipur to Sonachow Road from Ch.00 to 500m. b) Improvement of Sosirchar Bazar to Jamtala Via Community Clinic road from Ch.00 to 500m. c) Improvement of Sosairchar Paharbari to Daichar Govt. Primary School road from Ch.00 to 500m
|
RIDP-CBC
|
faridganj
|
|
1.00
|
|
|
87.89
|
M/S. Contemporary
|
86.56
|
|
18/02/2018
|
23/10/2018
|
60
|
|
|
|
|
215
|
RIDP(CBC)/Ch-W15
|
Improvement of Haimchar Upazila H/Q-Charbhairabi GC (Via Bordar pool, Gondamara Madrasa, High School, Tamtam Bridge) (Ch. 7650-8650m) Tender ID No. 18792
|
RIDP-CBC
|
haimchar
|
413472005
|
1.00
|
0.00
|
0
|
8849224.00
|
M/S. Patwary Construction
|
6900000.00
|
09/04/2015
|
09/04/2015
|
13/11/2015
|
100
|
6822957.00
|
0
|
01/02/2017
|
|
216
|
RIDP(CBC)/Ch-M49 ID: 413472005
|
Periodic Maintenance (Overlay) of road from Haimchar Upazila H/Q to Charbhairabi G.C. (Via Bordar pool, Gondamara Madrasa, High School, Old Howladar bazar, Charbhanga High School,Tamtam Bridge) (Ch. 5442-6242m) (ID No. 36258)
|
RIDP-CBC
|
haimchar
|
|
0.80
|
|
|
17.64
|
M.Asma Enterprise
|
16.47
|
|
08/02/2016
|
20/11/2018
|
100
|
|
|
|
|
217
|
RIDP(CBC)/Ch-W15 ID: 413472005
|
Improvement of Haimchar Upazila H/Q-Charbhairabi GC (Via Bordar pool, Gondamara Madrasa, High School, Tamtam Bridge) (Ch. 7650-8650m) Tender ID No. 18792
|
RIDP-CBC
|
haimchar
|
|
1.00
|
|
|
88.49
|
M/S. Patwary Construction
|
69.00
|
|
09/04/2015
|
13/11/2015
|
100
|
|
|
|
|
218
|
RIDP(CBC)/Ch-W146 ID: 413472005
|
Improvement of Haimchar Upazila H/Q-Charbhairabi GC (Via Bordar pool, Gondamara Madrasa, High School, Tamtam Bridge) (Ch.9650-11060m)
|
RIDP-CBC
|
haimchar
|
|
1.41
|
|
|
115.91
|
M/S. Khair Enterprise
|
104.32
|
|
28/02/2017
|
12/04/2018
|
100
|
|
|
|
|
219
|
RIDP(CBC)/Ch-W182 ID: 413472004
|
Improvement of Ishanbala GC to Shariatpur to Chandpur R&H from Ch. 00 to 2990m
|
RIDP-CBC
|
haimchar
|
|
2.99
|
|
|
314.76
|
M/S. National Trade System
|
283.29
|
|
26/02/2018
|
21/11/2018
|
65
|
|
|
|
|
220
|
RIDP(CBC)/Ch-W163 ID NO.413473003
|
Improvement of Algi South UP to Rayer Bazar Bardar Pool Road via Purba Algi Govt. Paimary School Road from Ch. 2020m to 3520m and
|
RIDP-CBC
|
haimchar
|
|
1.50
|
|
|
97.16
|
M/S. Khair Enterprise
|
91.39
|
|
18/06/2017
|
24/02/2018
|
100
|
|
|
|
|
221
|
RIDP(CBC)/Ch-W169 ID 413473004
|
Improvement of Algi North UP Office to Katakhali GC Road from Ch. 500 to 1238m ID 124328
|
RIDP-CBC
|
haimchar
|
|
0.74
|
|
|
51.74
|
M/S. Momotaj Enterprise
|
49.30
|
|
26/11/2017
|
26/07/2018
|
65
|
|
|
|
|
222
|
RIDP(CBC)/Ch-W148 ID : 413474038 ID 413474049, ID 413474012
|
a) Improvement of Kala Chowkider Mor to Dinia Madrasha road (500-1114m (b) Improvement of Gazir bazar-Bazafti Govt. Primary School Via Voingolia road Ch. 00-500m (c) Improvement of Algi South UP-Charvarbi GC Via Charvanga High School road ( Ch: 4500-4700
|
RIDP-CBC
|
haimchar
|
|
1.31
|
|
|
82.57
|
M/S. Aboni Traders
|
82.24
|
|
28/02/2017
|
07/11/2017
|
100
|
|
|
|
|
223
|
RIDP(CBC)/Ch-W170 ID : 413475072
|
a) Improvement of Rahaman Kabiraj house to Katakhali Road ID No. 413474017 from Ch. 00 to 400 m b) Improvement of Amtoli to Badsha Sarder House via Khalifakandi GPS from Ch. 00 to 617 m
|
RIDP-CBC
|
haimchar
|
|
|
|
|
72.84
|
M/S. Ripon Traders
|
69.22
|
|
30/11/2017
|
29/07/2018
|
100
|
|
|
|
|
224
|
RIDP(CBC)/Ch-W171 ID : 413475005
|
Improvement of Uttar Charbhairabi primary school to Tajkhar kandi Govt. primary school from Ch. 00 to 1007 m
|
RIDP-CBC
|
haimchar
|
|
1.01
|
|
|
74.12
|
M/S. Ripon Traders
|
67.45
|
|
30/11/2017
|
29/07/2018
|
100
|
|
|
|
|
225
|
RIDP(CBC)/Ch.W195 ID No 413474008
|
Improvement of Gondamara Sub Post Office to Katakhali to Gondamara road from Ch.00 to 825m
|
RIDP-CBC
|
haimchar
|
|
0.83
|
|
|
54.59
|
M/S. Khair Enterprise
|
49.13
|
|
28/03/2018
|
04/12/2018
|
100
|
|
|
|
|
226
|
RIDP(CBC)/Ch-W149 ID : 413474040, ID. 413474018
|
a) Improvement of Algi Bazar-Faridgonj Thana Border roaf Via Ismail Mamber bari road ( Ch:00-660m, and b) Improvement of Algi South UP Office-Charvairobi GC road ( Ch: 00-800m,
|
RIDP-CBC
|
haimchar
|
|
1.46
|
|
|
93.39
|
M/S. Aboni Traders
|
84.05
|
|
27/03/2017
|
04/12/2017
|
80
|
|
|
|
|
227
|
RIDP(CBC)/Ch-W11
|
Improvement of Palishara bazar GC-Sonapur GC Road via Kakairtola-Gondabyapur bazar road (Ch. 4203-6103m) Tender ID No. 26349 (b) Construction of 2x4.00x4.00m RCC Box Culver on Same road at Ch, 5942m
|
RIDP-CBC
|
haziganj
|
413492009
|
1.90
|
0.00
|
90
|
13841917.00
|
M/S. Zakir Enterprise
|
12484691.00
|
17/08/2015
|
17/08/2015
|
23/05/2016
|
100
|
12379755.00
|
90
|
01/02/2017
|
|
228
|
RIDP(CBC)/Ch-W11 ID 413492009
|
Improvement of Palishara bazar GC-Sonapur GC Road via Kakairtola-Gondabyapur bazar road (Ch. 4203-6103m) Tender ID No. 26349 (b) Construction of 2x4.00x4.00m RCC Box Culver on Same road at Ch, 5942m
|
RIDP-CBC
|
haziganj
|
|
1.90
|
|
|
138.42
|
M/S. Zakir Enterprise
|
124.85
|
|
17/08/2015
|
23/05/2016
|
100
|
|
|
|
|
229
|
RIDP(CBC)/Ch-W21 ID : 413493006
|
Improvement of Suhilpur Bazar-Kalachow South UP road (Ch. 3016-4261m) Tender ID No.19571
|
RIDP-CBC
|
haziganj
|
|
1.25
|
|
|
71.89
|
M/S. Patwary Constuction
|
71.89
|
|
11/06/2015
|
16/01/2016
|
100
|
|
|
|
|
230
|
RIDP(CBC)/Ch-W106 ID 413493013
|
a) Improvement of Balakhal - Paschim Barkul UP ( Ramchandrapur ) road ( Ch. 1325 - 2000 m, b) Protection works 373 m at the same road.
|
RIDP-CBC
|
haziganj
|
|
0.68
|
|
|
76.70
|
Md. Akbor Hossain Mridha
|
69.01
|
|
11/07/2016
|
10/03/2018
|
100
|
|
|
|
|
231
|
RIDP(CBC)/Ch-W108 ID 413493022
|
Improvement of Palishara bazar - Kashimpur bazar Deshgaon UP road ( Ch. 2000 - 3000 m,
|
RIDP-CBC
|
haziganj
|
|
1.00
|
|
|
62.18
|
Md. Afzal Hossain
|
57.97
|
|
20/07/2016
|
30/12/2017
|
100
|
|
|
|
|
232
|
RIDP(CBC)/Ch-W1109 ID 413493020
|
Improvement of Hazigonj Upazila H/Q ( Kangaish Rail line) - Tongirpar - Belghor Arong bazar road ( Ch. 2660 - 3660 m,
|
RIDP-CBC
|
haziganj
|
|
1.00
|
|
|
65.60
|
M/S. Nur Hossain Traders
|
61.00
|
|
22/06/2016
|
30/06/2017
|
100
|
|
|
|
|
233
|
RIDP(CBC)/Ch-W110 Road ID 413493014 Road ID 413493019
|
a) Improvement of Hatila West UP - Dhadda Khalpar bazar road ( Ch. 250 - 865m, b) Improvement of Hazigonj Barkul Ferry ghat (East ) UP office road ( Ch. 1155 - 1655m),
|
RIDP-CBC
|
haziganj
|
|
1.12
|
|
|
76.70
|
Md. Akbor Hossain Mridha
|
65.09
|
|
11/07/2016
|
30/08/2017
|
100
|
|
|
|
|
234
|
RIDP(CBC)/Ch.W-137 ID No. 413493015
|
Improvement of Cheangatali GC (Dadasgram up)-Dhadda Khalpar bazar via Shaheb bazar and Pirojpur Bazar (Ch.4340 - 5430m,
|
RIDP-CBC
|
haziganj
|
|
1.09
|
|
|
68.60
|
Md Ahsan Habib Arun
|
64.18
|
|
15/03/2017
|
06/06/2018
|
100
|
|
|
|
|
235
|
RIDP(CBC)/Ch.W-138 D No. 413493010
|
a) Improvement of Maligaon bazar-Deshgaon U.P road (Ch.00 - 1148m, ID No. 413493010) under Hazigonj Upazila, Dist. Chandpur and b) Construction of 2x4.0x4.0 m RCC Box Culvert at ch.176m on the same road.
|
RIDP-CBC
|
haziganj
|
|
1.15
|
|
|
82.55
|
M/S. Faruk Traders
|
73.78
|
|
24/11/2016
|
01/08/2017
|
100
|
|
|
|
|
236
|
RIDP(CBC)/Ch-W12 Road ID: 413493004
|
Improvement of Kalachow North UP-Changatali GC Road (Ch. 1550-2435m) Tender ID No. 27029
|
RIDP-CBC
|
haziganj
|
|
0.89
|
|
|
46.00
|
M/A. A Rahman Enterprise
|
41.03
|
|
17/09/2015
|
29/04/2016
|
100
|
|
|
|
|
237
|
RIDP(CBC)/Ch-W108 Road ID 413493022
|
Improvement of Palishara bazar - Kashimpur bazar Deshgaon UP road ( Ch. 2000 - 3000 m, ID No. 413493022)
|
RIDP-CBC
|
haziganj
|
|
1.00
|
|
|
62.18
|
Md. Afzal Hossain
|
57.97
|
|
20/07/2016
|
30/12/2017
|
100
|
|
|
|
|
238
|
RIDP(CBC)/Ch-W107 Road ID 413493003
|
a) Improvement of Waruk station bazar - Hatila East U.P road ( Ch.7050 - 8050 m , ID No. 413493003 ) b) Construction of 01 no. 3.5x3.5 m RCC Box culvert at ch. 7248m on the same road.
|
RIDP-CBC
|
haziganj
|
|
1.00
|
|
|
81.25
|
Abdul Kader Bapari
|
76.58
|
|
11/07/2016
|
30/12/2017
|
35
|
|
|
|
|
239
|
RIDP(CBC)/Ch-W23 Road ID : 413494017
|
Improvement of Satbaria-Batiyapara road (Ch. 00-800m) Tender ID No. 19573
|
RIDP-CBC
|
haziganj
|
|
0.80
|
|
|
37.53
|
M/S. Zakir Enterprise
|
37.53
|
|
31/03/2015
|
06/07/2015
|
100
|
|
|
|
|
240
|
RIDP(CBC)/Ch-W43 Road ID : 413495072
|
Improvement of Bangla Bazar to Bhatra Dulal Patwary Bari Mosque via Bhatra Primary School road (Ch. 00-1000m) ID No. 22662
|
RIDP-CBC
|
haziganj
|
|
1.00
|
|
|
47.55
|
Md. Gais Uddin Prodhan
|
43.30
|
|
28/06/2015
|
27/12/2015
|
100
|
|
|
|
|
241
|
RIDP(CBC)/Ch-W22 Road ID : 413495071
|
Improvement of Jagannathpur Ferrighat-Horipur-Bhatbari road (Ch. 00-1685m) Tender ID No. 19572
|
RIDP-CBC
|
haziganj
|
|
1.69
|
|
|
78.38
|
M/S. Amana International
|
74.07
|
|
21/06/2015
|
10/05/2016
|
100
|
|
|
|
|
242
|
RIDP(CBC)/Ch-W34 Road ID: 413494029
|
Improvement of Sudia Maishaid-Rampur bazar Road (Ch. 2200-3050m) Tender ID No. 26343
|
RIDP-CBC
|
haziganj
|
|
1.17
|
|
|
37.69
|
M/S. Arifa Enterprise
|
34.86
|
|
05/08/2015
|
30/03/2016
|
100
|
|
|
|
|
243
|
RIDP(CBC)/Ch-W13 Road ID: 413494079
|
Improvement of Kapaikhap R&H (Pry. School)- Nasircat College Via Bangabandu bazar, Nasircat Post office road (Ch. 750-1917m) Tender ID No. 18799
|
RIDP-CBC
|
haziganj
|
|
1.17
|
|
|
60.28
|
M/S. Aboni Traders
|
59.99
|
|
20/04/2015
|
05/02/2016
|
100
|
|
|
|
|
244
|
RIDP(CBC)/Ch-W14 Road ID: 413494005
|
Improvement of Ramchandarpur-Pratabpur Ferryghat road (Ch. 00-400m) Tender ID No. 27028
|
RIDP-CBC
|
haziganj
|
|
0.40
|
|
|
22.03
|
M/S. A. Rahman Enterprise
|
19.50
|
|
17/09/2015
|
30/10/2016
|
100
|
|
|
|
|
245
|
RIDP(CBC)/Ch-W67 Road ID: 413494005
|
Improvement of Ramchandarpur-Pratabpur Ferryghat road (Ch. 400-1200m) Tender ID No. 29136
|
RIDP-CBC
|
haziganj
|
|
0.80
|
|
|
36.18
|
M/S. A. Rahman Enterprise
|
32.11
|
|
05/11/2015
|
30/10/2016
|
100
|
|
|
|
|
246
|
RIDP(CBC)/Ch-W47 Road ID: 413494008
|
Improvement of Hazigonj-Khakbaria road (Ch. 4155-3500m) ID No. 23939
|
RIDP-CBC
|
haziganj
|
|
0.35
|
|
|
17.02
|
M/S. Sanim Enterprise
|
14.98
|
|
15/06/2015
|
22/12/2015
|
100
|
|
|
|
|
247
|
RIDP(CBC)/Ch-W54 Road ID: 413494031
|
Improvement of Bakhorpara Eidgoan Bazar- Janata Bazar Via Sakshepara road (Ch. 700-1525m) ID No.
|
RIDP-CBC
|
haziganj
|
|
0.83
|
|
|
40.15
|
M/S. A. Rahman Enterprise
|
37.44
|
|
19/09/2015
|
29/04/2016
|
100
|
|
|
|
|
248
|
RIDP(CBC)/Ch.W-150 ID No. 413494005
|
Improvement of Ramchandropur-Protabpur Farry Ghat road (Ch. 1200-1868m)
|
RIDP-CBC
|
haziganj
|
|
0.67
|
|
|
32.61
|
Md Anower Hossain
|
29.51
|
|
27/03/2017
|
15/01/2018
|
100
|
|
|
|
|
249
|
RIDP(CBC)/Ch.W-151 ID No. 413495072
|
Improvement of Banglabazar-Bhatra Dulal Patwart bari Mosque via Bhatra Promary School road (Ch. 1000-1565m)
|
RIDP-CBC
|
haziganj
|
|
0.57
|
|
|
34.87
|
Md Anower Hossain
|
32.15
|
|
27/03/2017
|
18/01/2018
|
100
|
|
|
|
|
250
|
RIDP(CBC)/Ch.SW-34 ID No. 413494060
|
Improvement of Protabpur Farry Ghat-Ramchandropur Ghabba Bri via Sadra Chowrasta road (Ch. 00-1000m)
|
RIDP-CBC
|
haziganj
|
|
1.00
|
|
|
57.83
|
M/S. Faysal Steel
|
52.91
|
|
05/03/2017
|
04/11/2017
|
100
|
|
|
|
|
251
|
RIDP(CBC)/Ch.W-144 ID No. 413494002
|
Improvement of Randunimura-Gopalkhore Road ( Ch.2900 - 3900m,
|
RIDP-CBC
|
haziganj
|
|
1.00
|
|
|
61.38
|
M/S. Tanim Enterprise
|
60.11
|
|
30/01/2017
|
30/09/2017
|
100
|
|
|
|
|
252
|
RIDP(CBC)/Ch.W-145 ID No. 413494048 ID No. 413494053
|
a) Improvement of Rampur bazar-Kalochow road via Maramura, Parapur High School Tarapallah road ( Ch.210 - 710m,
b) Improvement of Kalochow south UP (Orpur mazar gate)- Kalochow road (Londoni bari ) via Mohammad pur road ( Ch.00 - 400m,
|
RIDP-CBC
|
haziganj
|
|
0.90
|
|
|
0.00
|
M/S. Tanim Enterprise
|
51.93
|
|
30/01/2017
|
30/09/2017
|
100
|
|
|
|
|
253
|
RIDP(CBC)/Ch.W-165 ID No. 413494038
|
Improvement of Sandra palishara GC ( Hotoni) road to Deshgoan Degree collage road from Ch.00 to 1000m
|
RIDP-CBC
|
haziganj
|
|
1.00
|
|
|
66.84
|
M/S. Faysal Steel
|
66.41
|
|
27/07/2017
|
02/04/2018
|
100
|
|
|
|
|
254
|
RIDP(CBC)/Ch-W172 ID No. 413495075
|
Improvement of Uccanga to Mogoar bari road from Ch.1000 to 1448m
|
RIDP-CBC
|
haziganj
|
|
0.45
|
|
|
29.97
|
M/S. Adrita Enterprise
|
31.18
|
|
11/02/2018
|
10/10/2018
|
100
|
|
|
|
|
255
|
RIDP(CBC)/Ch-W176 ID No. 413494083
|
a) Improvement of Joyshara R&H to Gondobopur UP office road from Ch.00 to 1065m under Hazigonj Upazila Dist. Chandpur. b) Construction of 2x3.0mx3.0m Culvert at Ch. 766m on the same road.
|
RIDP-CBC
|
haziganj
|
|
1.07
|
|
|
78.96
|
M/S. Faysal Steel
|
76.88
|
|
13/12/2017
|
19/08/2018
|
100
|
|
|
|
|
256
|
RIDP(CBC)/Ch.W-164 ID No. 413494037
|
Improvement of Sandra palishara GC Pachi road to Desh goan Degree collage via Ghatia bari road from Ch. 00 to 1000m
|
RIDP-CBC
|
haziganj
|
|
1.00
|
|
|
62.95
|
M/S. Contemporary
|
66.00
|
|
18/10/2017
|
24/06/2018
|
50
|
|
|
|
|
257
|
RIDP(CBC)/Ch-W175 ID No. 413494026
|
Improvement of Suhilpur bazar to Kathali Badamtali Via Sharasia Community School road from Ch. 00 to 500m
|
RIDP-CBC
|
haziganj
|
|
0.50
|
|
|
31.79
|
M/S. Tanim Enterprise
|
31.69
|
|
31/01/2018
|
06/01/2018
|
40
|
|
|
|
|
258
|
RIDP(CBC)/Ch-M120 ID 413492001
|
Periodic Maintenance (Overlay) of Debpur RHD-Rajargoan Bazar road (Ch. 00-1800m)
|
RIDP-CBC
|
haziganj
|
|
1.80
|
|
|
53.72
|
M/S. Bangladesh Construction
|
49.25
|
|
27/02/2017
|
26/10/2017
|
100
|
|
|
|
|
259
|
RIDP(CBC)/Ch-M162 ID No. 413492005
|
a) Periodic Maintenance Rehabilitation of Hazigonj to Palishara Bazar Road ID No. 413492005 from Ch 2860m to 5843m, b) Re-Construction of 2x3.5x4.0m Culvert on the same road Ch.3560m
|
RIDP-CBC
|
haziganj
|
|
2.98
|
|
|
106.06
|
Md Alamgir Hayder Bhuyan
|
110.83
|
|
08/05/2018
|
14/01/2019
|
80
|
|
|
|
|
260
|
RIDP(CBC)/Ch-M28 ID : 413493015
|
Re-Construction of 2x4.00x4.50m RCC Box Culvert on Changatoli GC-Dhadda-Khalpar Bazar Road via Shaheb Bazar & Pirojpur Bazar road at Ch. 2372m, Tender ID No.18796
|
RIDP-CBC
|
haziganj
|
|
|
|
|
17.87
|
Md Gias Uddin Prodhan
|
14.67
|
|
06/05/2015
|
30/06/2016
|
100
|
|
|
|
|
261
|
RIDP(CBC)/Ch-M52 ID: 413493020
|
Re-Construction of 1x3.00x4.00m RCC Box Culvert on Hazigonj Upazila H/Q (Kangaish Rail line)-Tongirpar-Belghor Arong Bazar Road at Ch. 3200m (ID No. 36262)
|
RIDP-CBC
|
haziganj
|
|
|
|
|
10.11
|
A. Rahman Enterprise
|
8.09
|
|
07/02/2016
|
14/08/2016
|
100
|
|
|
|
|
262
|
RIDP(CBC)/Ch-M53 ID: 413494071
|
Periodic Maintenance (Rehabilitation) of Dhadda Khalpar Bazar - Goureshor Shaheber Dokan Road Via Goureshor West/North (Ch. 00-2100m) ID No. 36263
|
RIDP-CBC
|
haziganj
|
|
2.10
|
|
|
42.30
|
Ahsan Habib Arun
|
36.97
|
|
31/01/2016
|
07/08/2016
|
100
|
|
|
|
|
263
|
RIDP(CBC)/Ch-M121 ID 413492003
|
Periodic Maintenance (Overlay) (Rehabilitation) of R&H Raghunathpur GC Road (Ch. 5100-6400M)
|
RIDP-CBC
|
haziganj
|
|
1.30
|
|
|
70.38
|
Md Ahsan Habib Arun
|
65.42
|
|
15/03/2017
|
23/11/2017
|
100
|
|
|
|
|
264
|
RIDP/(CBC)/Ch-M148 ID No. 413582004
|
Periodic Maintenance (Overlay) of Teguria R&H-Baichara to Nowabpur GC Road from Ch. 2997 to 6150m
|
RIDP-CBC
|
kachua
|
|
3.15
|
|
|
52.23
|
M/S. Shalaha Enterprise
|
55.65
|
|
29/03/2018
|
14/12/2018
|
100
|
|
|
|
|
265
|
RIDP(CBC)/Ch-SM1 ID 413583028
|
Periodic Maintenance of Gohat South UP (Rahimanagar)-Kailain bazar via Palgiri road (Ch. 1563-4233m) Tender ID No. 16434
|
RIDP-CBC
|
kachua
|
|
2.67
|
|
|
36.22
|
M/S. M.S Traders
|
32.20
|
|
16/03/2015
|
09/01/2016
|
100
|
|
|
|
|
266
|
RIDP(CBC)/Ch.SM-6 ID No. 413583019
|
Maintenance of Ashrafpur UP to Poyelgacha road (Ashrafpur Purba Bazar More to Eidgah Road) from Ch.00 to 150m and 1000 to 1900m
|
RIDP-CBC
|
kachua
|
|
0.15
|
|
|
27.51
|
M/S. Sams Engineering
|
27.46
|
|
06/10/2017
|
20/01/2018
|
100
|
|
|
|
|
267
|
RIDP(CBC)/Ch-M3 ID 413583032
|
Periodic Maintenance of Ashrafpur UP-Beltali Bazar Road (Ch. 00-1100m) Tender ID No.16437
|
RIDP-CBC
|
kachua
|
|
1.10
|
|
|
10.00
|
Md. Kamal Hossain
|
8.50
|
|
08/03/2015
|
14/06/2015
|
100
|
|
|
|
|
268
|
RIDP(CBC)/Ch-M46 ID: 413583012
|
Periodic Maintenance (Overlay) of Rahimanagar-Koitoba-Amujan road (Ch. 3500-4650m) (ID No. 36255)
|
RIDP-CBC
|
kachua
|
|
1.12
|
|
|
25.52
|
M.S Traders
|
25.40
|
|
31/01/2016
|
07/08/2016
|
100
|
|
|
|
|
269
|
RIDP(CBC)/Ch-M47 ID: 413583008
|
Periodic Maintenance (Overlay) of Akania-Enayetpur-Fatepur road (Ch. 2000-2950m) (ID No. 36256)
|
RIDP-CBC
|
kachua
|
|
0.95
|
|
|
19.87
|
M.S. Traders
|
19.77
|
|
31/01/2016
|
07/08/2016
|
100
|
|
|
|
|
270
|
RIDP(CBC)/Ch-M48 ID: 413583010
|
Periodic Maintenance (Overlay) of Ujani Bazar-Uttar Kachua UP (Tetueya) road (Ch. 1000-1800m) (ID No. 36257)
|
RIDP-CBC
|
kachua
|
|
0.80
|
|
|
19.90
|
M.S Traders
|
19.80
|
|
31/01/2016
|
02/10/2017
|
100
|
|
|
|
|
271
|
RIDP(CBC)/Ch-M38 Road ID 413582006
|
Maintenance of Batapukuria-Uttarshibpur-Narayenpur GC road (Ch. 00-1925m) under Kachua Upazila, Chandpur. (Road ID: 413582006) ID No. 27213
|
RIDP-CBC
|
kachua
|
|
1.93
|
|
|
68.14
|
M/S. Bashar Traders
|
57.25
|
|
17/09/2015
|
22/05/2016
|
100
|
|
|
|
|
272
|
RIDP(CBC)/Ch- W120 ID 413582010
|
Improvement of Rahimanagar GC - Nalua Bazar - Raghunathpur GC Road (Ch. 3500 - 4460m)
|
RIDP-CBC
|
kachua
|
|
0.96
|
|
|
62.45
|
M/S Shohag Enterprise
|
58.08
|
|
21/09/2016
|
25/12/2017
|
100
|
|
|
|
|
273
|
RIDP(CBC)/Ch- W1 ID 413582012
|
Improvement of Kachua- Miar Bazar- Adda Bazar Rd ( Ch. 5328 m-5367 m & Ch. 5467m-5639m )
|
RIDP-CBC
|
kachua
|
|
0.21
|
|
|
16.75
|
Md Abdul Hai
|
16.72
|
|
24/11/2014
|
12/08/2015
|
100
|
|
|
|
|
274
|
RIDP(CBC)/Ch.W-142 ID No. 413582009
|
Improvement of Kachua GC-Teguria R&H road ( , Ch. 8614m -9060m)
|
RIDP-CBC
|
kachua
|
|
0.45
|
|
|
19.11
|
M/S. Nur Hossain Traders
|
18.53
|
|
17/01/2017
|
12/11/2017
|
100
|
|
|
|
|
275
|
RIDP(CBC)/Ch-W24 Road ID: 413583007
|
Improvement of Pathair-Majigacha-Nandanpur Road (Ch. 1065-1425m) Tender ID No. 27027
|
RIDP-CBC
|
kachua
|
|
0.36
|
|
|
19.93
|
M/S. ShikderTrading Agincy
|
19.66
|
|
17/09/2015
|
24/03/2016
|
100
|
|
|
|
|
276
|
RIDP(CBC)/Ch-W25 Road ID: 413583011
|
Improvement of Dashkin Kachua UP-Chandpur Bazar road (Ch. 3200-3592m) Tender ID No. 29293
|
RIDP-CBC
|
kachua
|
|
0.39
|
|
|
20.72
|
Md. Kamal Hossain
|
20.68
|
|
20/10/2015
|
30/10/2016
|
100
|
|
|
|
|
277
|
RIDP(CBC)/Ch-W26 Road ID: 413583004
|
Improvement of Karaiya UP(Subidpur)-Darveshganj Bazar road (Ch. 6500-7200m) Tender ID No. 19577
|
RIDP-CBC
|
kachua
|
|
0.70
|
|
|
40.09
|
M/S. Ranu Mia
|
37.28
|
|
19/05/2015
|
21/04/2016
|
100
|
|
|
|
|
278
|
RIDP(CBC)/Ch-W27 Road ID: 413583016
|
Improvement of Pathair-Shilastan-Aliara Bazar road Road (Ch. 3064-4014m) Tender ID No. 19578
|
RIDP-CBC
|
kachua
|
|
0.95
|
|
|
49.53
|
M/S. Ranu Mia
|
46.06
|
|
20/05/2015
|
21/04/2016
|
100
|
|
|
|
|
279
|
RIDP(CBC)/Ch-SW16 Road ID: 413583015
|
Improvement of Sachar Bazar-Durgapur-Bitara Bazar road (Ch. 2185-2885m) ID No. 25618
|
RIDP-CBC
|
kachua
|
|
0.70
|
|
|
36.78
|
M/S. Bashar Traderts
|
33.28
|
|
10/08/2015
|
15/03/2016
|
100
|
|
|
|
|
280
|
RIDP(CBC)/Ch-W53 Road ID 413583027
|
(a) Improvement of Karaya UP (Akiara)-Taltoli Ayengiri Bazar road (Ch. 550-1250m), (Package No. RIDP(CBC)/Ch-W53) ID No. 26348 (b) Construction of 90m Protection work on Same road
|
RIDP-CBC
|
kachua
|
|
0.70
|
|
|
47.99
|
M/S. Akter Enterprise
|
45.26
|
|
04/08/2015
|
24/06/2016
|
100
|
|
|
|
|
281
|
RIDP(CBC)/Ch.W-143 ID No.413583018
|
Improvement of Batabaria - Darbeshgon j road ( Ch.4585 - 6080m, )
|
RIDP-CBC
|
kachua
|
|
1.50
|
|
|
90.73
|
M/S. Shohag Enterprise
|
86.84
|
|
14/12/2016
|
29/04/2018
|
100
|
|
|
|
|
282
|
RIDP(CBC)/Ch.W-139 ID No. 413583008,
|
a) Improvement of Akania-Enayetpur-Fateypur road ( Ch. 4450m -5540m) under Kachua upazila, Dist. Chandpur. b) Construction of 2.00x3.00m RCC Box culvert at ch.4800m on the same road.
|
RIDP-CBC
|
kachua
|
|
1.00
|
|
|
76.92
|
M/S. Kamal Hossain
|
75.35
|
|
03/02/2017
|
03/10/2017
|
60
|
|
|
|
|
283
|
RIDP(CBC)/Ch.W-140 ID No. 413585192 ID No. 413585229
|
a) Improvement of Pulgiri-Taltoli Up complex Via Batabaria Road ( , Ch. 00m -650m) b) Improvement of Jagatpur -parul Road-chakra munshi Bari jam-E-Mosque- Rasul pur GPS ( , Ch. 00m -300m)
|
RIDP-CBC
|
kachua
|
|
0.95
|
|
|
52.23
|
M/S. Fahim Traders
|
52.21
|
|
14/12/2016
|
08/10/2017
|
100
|
|
|
|
|
284
|
RIDP(CBC)/Ch- W2
Road ID 413584190
|
Improvement of Palgiri - Borgi From Pacca Rd to Horichail Rd (Ch. 00-650 m) (No e-gp Tender)
|
RIDP-CBC
|
kachua
|
|
0.65
|
|
|
32.56
|
Md Abdul Hai
|
30.93
|
|
24/11/2014
|
24/09/2015
|
100
|
|
|
|
|
285
|
RIDP(CBC)/Ch- W3
Road ID 413584021
|
Improvement of Satbaria- Khila- Nurpur High School (Ch. 00-511 m) (No e-gp Tender)
|
RIDP-CBC
|
kachua
|
|
0.51
|
|
|
23.73
|
Md Abdul Hai
|
23.70
|
|
24/11/2014
|
12/08/2015
|
100
|
|
|
|
|
286
|
RIDP(CBC)/Ch- W46
Road ID 413588192
|
Construction of 2x4.50x3.50m RCC Box Culvert on Palgiri-Taltoli UP Complex via Batabria road at Ch. 280m ID No. 23938
|
RIDP-CBC
|
kachua
|
|
|
|
|
17.08
|
M/S. Fahim Traders
|
17.03
|
|
09/08/2015
|
27/04/2016
|
100
|
|
|
|
|
287
|
RIDP(CBC)/Ch-SW15 Road ID: 413584092
|
Improvement of Nurpur-Boratolagoan road (Ch. 1421-1980m) ID No. 25617
|
RIDP-CBC
|
kachua
|
|
0.56
|
|
|
25.59
|
M/S. Shohag Enterprise
|
22.90
|
|
26/07/2015
|
01/04/2016
|
100
|
|
|
|
|
288
|
RIDP(CBC)/Ch-W49 Road ID: 413584084
|
Improvement of Barayara-Modhupur-Shilastan Road (Ch. 4100-5360m) ID No. 25613
|
RIDP-CBC
|
kachua
|
|
1.20
|
|
|
62.53
|
M/S. Aboni Traders
|
62.46
|
|
06/08/2015
|
13/03/2016
|
100
|
|
|
|
|
289
|
RIDP(CBC)/Ch-W62 Road ID: 413585227
|
Improvement of Aliara-Rajbari-Sachar road from Ch. 00-300m (b) Construction of 2x4.00x4.00m RCC Box Culvert on Same road at Ch. 373m ID No. 27660
|
RIDP-CBC
|
kachua
|
|
0.30
|
|
|
30.10
|
M/S. Shikder Assiociat
|
26.91
|
|
17/09/2015
|
23/03/2016
|
100
|
|
|
|
|
290
|
RIDP(CBC)/Ch-W78 (Road ID: 413584176
|
Improvement of Rosulpur-Hossinpur Bazar road (Ch. 00-1500m)
|
RIDP-CBC
|
kachua
|
|
1.50
|
|
|
74.29
|
M/S. Shohag Enterprise
|
73.92
|
|
31/01/2016
|
07/08/2016
|
100
|
|
|
|
|
291
|
RIDP(CBC)/Ch-W9 Road ID : 413585222
|
Construction of 3x4.50x4.50m Box Culvert on Sadipur Vallage Connecting Road over Kachua-Hazigonj Khal at Ch. 5.00m Tender ID No. 17779
|
RIDP-CBC
|
kachua
|
|
|
|
|
25.27
|
M/S. Tahar & co.
|
21.11
|
|
02/04/2015
|
09/10/2015
|
100
|
|
|
|
|
292
|
RIDP(CBC)/Ch-W28 Road ID: 413585207
|
Improvement of Chandpur Bazar-Puranpur Bazar road (Ch. 500-1700m) Tender ID No. 19579
|
RIDP-CBC
|
kachua
|
|
1.20
|
|
|
56.04
|
M/S. Ranu Mia
|
52.11
|
|
19/05/2015
|
30/05/2017
|
100
|
|
|
|
|
293
|
RIDP(CBC)/Ch-W29 Road ID: 413585059
|
Improvement of Shaidapur-Dighirpart-Barahayetpur road (Ch. 870-2170m) Tender ID No. 19580
|
RIDP-CBC
|
kachua
|
|
1.30
|
|
|
60.67
|
M/S. Ranu Mia
|
56.43
|
|
20/05/2015
|
03/07/2015
|
100
|
|
|
|
|
294
|
RIDP(CBC)/Ch-SW19 ID: 413584091).
|
Improvement of Ragdail Bazar-Bayek Bazar road (Ch. 00-1000m) ID No. 44057
|
RIDP-CBC
|
kachua
|
|
1.00
|
|
|
55.70
|
M/S. Nur Hossain Traders
|
55.74
|
|
13/04/2016
|
20/12/2016
|
100
|
|
|
|
|
295
|
RIDP(CBC)/Ch-SW13 ID: 413585243
|
Improvement of Islampur Hossain House-Primary School Chapatoli Madshara road (Ch. 00-1000m) Tender ID No. 27026
|
RIDP-CBC
|
kachua
|
|
1.00
|
|
|
44.06
|
M/S. Shikder Assiociat
|
39.65
|
|
06/09/2015
|
05/11/2016
|
100
|
|
|
|
|
296
|
RIDP(CBC)/Ch-SW46 Road ID: 413585279
|
Improvement of Chotta Bhabanipur (RHD) road to Chotta Bhabanipur (Batu Patwary House) from Ch.00 to 875m
|
RIDP-CBC
|
kachua
|
|
0.88
|
|
|
52.64
|
M/S. Sams Engineering
|
54.95
|
|
02/10/2017
|
08/06/2018
|
100
|
|
|
|
|
297
|
RIDP(CBC)/Ch-W94 ID: 413485095
|
Improvement of Nasirpur-Akania Bazar-Akania Patwary Bari road (Ch. 2000-2800m) ID No. 43764
|
RIDP-CBC
|
kachua
|
|
0.80
|
|
|
42.60
|
M/S. AGA Corporation
|
39.99
|
|
23/02/2016
|
01/11/2016
|
100
|
|
|
|
|
298
|
RIDP(CBC)/Ch-SW18 ID: 413584185
|
(a) Improvement of Palgiri R & H to Kolomia-Nowla GC Pucca Road (Starting point Palgiri School) from (Ch. 1000-2281m) Construction of 1x2.20x2.00m Box Culvert on Same road at Ch. 1770m
|
RIDP-CBC
|
kachua
|
|
1.28
|
|
|
63.01
|
Md Abdul Hai
|
62.98
|
|
14/12/2015
|
01/03/2018
|
100
|
|
|
|
|
299
|
RIDP(CBC)/Ch-W177 ID No. 413584176
|
Improvement of Rosulpur to Hossinpur Bazar road from Ch.2500 to 3650m
|
RIDP-CBC
|
kachua
|
|
1.15
|
|
|
84.02
|
M/S. Shohag Enterprise
|
81.24
|
|
04/02/2018
|
10/10/2018
|
55
|
|
|
|
|
300
|
RIDP(CBC)/Ch-W61 ID: 413584020
|
Improvement of Nischintapur Madrasha-Domoria road from Ch. 00-450m (b) Construction of 2x4.00x4.00m RCC Box Culvert on Same road at Ch. 150m ID No. 27659
|
RIDP-CBC
|
kachua
|
|
0.50
|
|
|
27.77
|
M/S. Bashar Traders
|
37.61
|
|
30/09/2015
|
07/04/2016
|
55
|
|
|
|
|
301
|
RIDP(CBC)/Ch-W152 ID: 413585095
|
Improvement of Nashirpur-Akania Bazar-Akania Patwary bari road (Ch. 00-805m)
|
RIDP-CBC
|
kachua
|
|
0.81
|
|
|
51.83
|
M/S. A.G.A Corporation
|
49.98
|
|
12/03/2017
|
16/11/2017
|
60
|
|
|
|
|
302
|
RIDP(CBC)/Ch-SW38 Road ID: .413584192 ID No.413585261
|
a.) Improvement of Lunti Bridge to Jalil Professor's bari via Mollah bari road ( Ch.000 to 1144m, b.) Improvement of Bordoil Ujjalpur village road ( Zamtola to Bank of Khirai river) ( Ch.000 to 200m, )
|
RIDP-CBC
|
kachua
|
|
1.38
|
|
|
92.08
|
M/S. Sans Engineering & Const.
|
91.96
|
|
01/08/2017
|
07/04/2018
|
30
|
|
|
|
|
303
|
RIDP(CBC)/Ch-W179 ID No. 413585239 ID No. 413585228
|
a) Improvement of Suarul to Madupur road from Ch.45 to 564m . b) Improvement of Bitara to Baisara Main Road to Mofij Chaiman Bari road from Ch.00 to 450m
|
RIDP-CBC
|
kachua
|
|
0.52
|
|
|
56.87
|
M/S. Ranu Mia
|
56.59
|
|
04/02/2018
|
10/10/2018
|
50
|
|
|
|
|
304
|
RIDP(CBC)/Ch-W180 ID No. 413584035
|
Improvement of Kohal thori to Paranpur via Akania road from Ch.1500 to 2300m
|
RIDP-CBC
|
kachua
|
|
0.80
|
|
|
53.76
|
M/S. Shohag Enterprise
|
50.94
|
|
04/02/2018
|
10/10/2018
|
40
|
|
|
|
|
305
|
RIDP(CBC)/Ch-W178 ID No. 413584180
|
Improvement of Ujani to Loskari to Boxgonj to duati Road from Ch.1125 to 2125m
|
RIDP-CBC
|
kachua
|
|
1.00
|
|
|
82.93
|
M/S. Ranu Mia
|
86.93
|
|
10/04/2018
|
16/12/2018
|
15
|
|
|
|
|
306
|
RIDP(CBC)/Ch-W204 Road ID:413585194 ID No. 413584055
|
a) Improvement of Jagotpur Bazar to Poyelgacha Road from Ch 00m to 1000m. b) Improvement of Nayakandi to Mongalmora road from Ch 00m to 618m
|
RIDP-CBC
|
kachua
|
|
1.62
|
|
|
111.46
|
Md Kamal Hossain
|
111.47
|
|
30/04/2018
|
19/01/2019
|
60
|
|
|
|
|
307
|
RIDP(CBC)/Ch-M146 ID No. 413963011
|
Periodic Maintenance (Re-Seal) of Matlab bazar to Uddamdi to Farzikandi UP Road from Ch. 1135 to 2115m
|
RIDP-CBC
|
matlab (dakshin)
|
|
0.98
|
|
|
13.36
|
M/S. Aboni Traders
|
13.29
|
|
07/03/2018
|
06/11/2018
|
100
|
|
|
|
|
308
|
RIDP(CBC)/Ch-RM10
|
Improvement of Narayanpur Bazar
|
RIDP-CBC
|
matlab (dakshin)
|
|
|
|
|
30.43
|
M/S. Faraji Enterprise
|
26.17
|
|
16/06/2016
|
23/02/2017
|
100
|
|
|
|
|
309
|
RIDP(CBC)/Ch-W10 ID: 413963004
|
Improvement of Barothalia Bazar-Asram-Pingra-Master bazar-Kumardugi road (Ch. 5350-6850m) Tender ID No.18794
|
RIDP-CBC
|
matlab (dakshin)
|
|
1.50
|
|
|
62.95
|
M/S. Tania & Co.
|
56.42
|
|
20/04/2015
|
07/01/2016
|
100
|
|
|
|
|
310
|
RIDP(CBC)/Ch-W82 ID: 413963002
|
Improvement of Matlab-Bohori Arong-Karbanda Road (Ch. 8099-8724m) under Matlab (South) Upazila, Chandpur
|
RIDP-CBC
|
matlab (dakshin)
|
|
0.63
|
|
|
39.65
|
M/S. Aboni Traders
|
39.29
|
|
01/02/2016
|
08/08/2016
|
100
|
|
|
|
|
311
|
RIDP(CBC)/Ch.W-136 ID No. 413963008 ID No. 413963010
|
a) Improvement of Narayanpur -Tushpur-Kachiara-pitambotdi Road ( Ch.3070 - 3335m) and b) Improvement of Narayanpur -Kalikapur H/S Road ( Ch.770 - 1270m)
|
RIDP-CBC
|
matlab (dakshin)
|
|
0.77
|
|
|
51.47
|
M/S. Irin Enterprise
|
51.24
|
|
01/12/2016
|
13/05/2018
|
100
|
|
|
|
|
312
|
RIDP(CBC)/Ch.W-134 ID No. 413963013
|
Improvement of Nayergoan GC-Nayergoan UP via Payer Khala Road ( Ch.2290 - 3290 m
|
RIDP-CBC
|
matlab (dakshin)
|
|
1.00
|
|
|
76.43
|
M/S, Mamun Enterprise
|
72.66
|
|
11/12/2016
|
15/08/2017
|
100
|
|
|
|
|
313
|
RIDP(CBC)/Ch.W-135 ID No. 413963007
|
Improvement of Narayanpur GC-Khadergoan bazar Road ( Ch.1500 - 2500 m)
|
RIDP-CBC
|
matlab (dakshin)
|
|
1.00
|
|
|
73.63
|
M/S. Faraji Enterprise
|
70.61
|
|
30/11/2016
|
07/08/2017
|
100
|
|
|
|
|
314
|
RIDP(CBC)/Ch-W5 Road ID 413964019
|
Improvement of Nowga bazar-Manapur bazar road (Ch. 1000-1758m) Tender ID No. 16438
|
RIDP-CBC
|
matlab (dakshin)
|
|
0.76
|
|
|
43.00
|
Md Gias Uddin Prodhan
|
40.70
|
|
16/03/2015
|
30/12/2016
|
100
|
|
|
|
|
315
|
RIDP(CBC)/Ch-W55 Road ID 413964012
|
Improvement of Chinau-Rasulpur-Badamtali Road (Ch. 00-1000m) ID No. 27215
|
RIDP-CBC
|
matlab (dakshin)
|
|
1.00
|
|
|
61.51
|
Md Sidu Meze
|
58.28
|
|
06/09/2015
|
30/12/2016
|
100
|
|
|
|
|
316
|
RIDP(CBC)/Ch-W56 Road ID 413964008
|
a) Improvement of Boalia-Achalchila-Charpoyali Road (Ch. 7067-8100m), (b) Construction of 117m Protective Work on Same road (Road ID: 413964008) ID No. 27216
|
RIDP-CBC
|
matlab (dakshin)
|
|
1.03
|
|
|
65.86
|
Md Sidu Meze
|
61.16
|
|
06/09/2015
|
30/12/2016
|
100
|
|
|
|
|
317
|
RIDP(CBC)/Ch-W86 (Road ID: 413964011, 413965001, 413964038)
|
Improvement of (a) Rajargaon-Mohamaya (Matlab South Part) road (Ch. 00-400m) Road ID. 413964011 b) DC road-Jafaria road (Ch. 200-600m) Road ID. 413965001 (c) Ashram-Dakgar road (Ch. 00-500m) Road ID 413964038, ID No. 38015
|
RIDP-CBC
|
matlab (dakshin)
|
|
1.30
|
|
|
73.54
|
M/S. Aboni Traders
|
73.32
|
|
01/02/2016
|
08/08/2016
|
100
|
|
|
|
|
318
|
RIDP(CBC)/Ch-W88 (ID: 413965043).
|
Improvement of Ashinpur-Aliara road to Jamia Mohammadia Darul-Ulum Madrasha road (Ch. 00-1200m) (ID No. 39857)
|
RIDP-CBC
|
matlab (dakshin)
|
|
1.20
|
|
|
65.87
|
National Trade System
|
62.51
|
|
08/02/2016
|
16/08/2016
|
100
|
|
|
|
|
319
|
RIDP(CBC)/Ch.W-133 ID No. 41396401 ID No. 413964017
|
a) Improvement of Pitambordi bazar-Naujan Road ( Ch.00 - 400 m, ID No. 413964016) and b) Improvement of Machuakahal-Charot Bhanga Road ( Ch.00 - 400 m, ID No. 413964017)
|
RIDP-CBC
|
matlab (dakshin)
|
|
0.80
|
|
|
51.51
|
M/S. Faraji Enterprise
|
51.25
|
|
29/11/2016
|
07/08/2017
|
100
|
|
|
|
|
320
|
RIDP(CBC)/Ch-W96 ID: 413964001
|
Improvement of Matlab-Dingabhanga Zia Bazar-Rajargaon Bazar Via Hazi bazar road (Ch. 00-800m) (Road ID: 413964001). (ID No. 45850)
|
RIDP-CBC
|
matlab (dakshin)
|
|
0.80
|
|
|
54.81
|
M/S. Baby Traders
|
52.06
|
|
13/03/2016
|
20/11/2016
|
20
|
|
|
|
|
321
|
RIDP/(CBC)/Ch-W183 ID No. 4139640122
|
Improvement of Chinau to Rasulpur to Badamtali road from Ch.1000 to 1692m
|
RIDP-CBC
|
matlab (dakshin)
|
|
0.69
|
|
|
50.14
|
Md Gias Uddin Prodhan
|
52.58
|
|
10/05/2018
|
16/01/2019
|
30
|
|
|
|
|
322
|
RIDP(CBC)/Ch.W-183 ID No. 4139640122
|
Improvement of Chinau to Rasulpur to Badamtali road from Ch.1000 to 1692m
|
RIDP-CBC
|
matlab (dakshin)
|
|
0.69
|
|
|
50.14
|
Md Gias Uddin Prodhan
|
52.58
|
|
10/05/2018
|
16/01/2019
|
30
|
|
|
|
|
323
|
RIDP(CBC)/Ch.W-184 ID No. 413964008
|
Improvement of Boalia to Achalchila Road ID No. 413964008 from Ch.6345 to 7067m
|
RIDP-CBC
|
matlab (dakshin)
|
|
0.72
|
|
|
49.27
|
M/S. Aboni Traders
|
51.30
|
|
07/03/2018
|
06/11/2018
|
15
|
|
|
|
|
324
|
RIDP(CBC)/Ch.W-185 ID No. 413965003
|
Improvement of Nagda Primary School to Mirama Road from Ch.00 to 500m
|
RIDP-CBC
|
matlab (dakshin)
|
|
0.50
|
|
|
32.50
|
M/S. Aboni Traders
|
34.00
|
|
07/03/2018
|
06/11/2018
|
40
|
|
|
|
|
325
|
RIDP(CBC)/Ch.W-119 ID No. 413965044
|
Improvement of Matlab WAPDA Larim Cold Storage-Nabakalash Molla bari road (Ch.00 - 1330m,
|
RIDP-CBC
|
matlab (dakshin)
|
|
1.33
|
|
|
73.07
|
M/S. Baby Traders
|
73.07
|
|
30/10/2016
|
07/10/2017
|
30
|
|
|
|
|
326
|
RIDP(CBC)/Ch-W83
|
Improvement of Mohonpur-Kalakanda UP Office-Sengachar GC Road (Ch. 1200-3000m) ID No. 36279
|
RIDP-CBC
|
matlab (uttar)
|
413763018
|
1.80
|
0.00
|
45
|
11233539.00
|
M/S. Sikder Enterprise
|
11222216.00
|
08/02/2016
|
08/02/2016
|
08/08/2016
|
75
|
5070869.00
|
45
|
01/02/2017
|
|
327
|
RIDP(CBC)/Ch-M2 ID 413763016
|
Periodic Maintenance of Amirabad bazar-Bamar bazar-Jhahirabad UP Office road (Ch. 400-1400m) Tender ID No. 16436
|
RIDP-CBC
|
matlab (uttar)
|
|
1.00
|
|
|
15.00
|
M/S. Gazi Builders
|
13.00
|
|
06/03/2015
|
30/12/2015
|
100
|
|
|
|
|
328
|
RIDP(CBC)/Ch-M51 ID: 413764075
|
Periodic Maintenance (Overlay) of Eklashpur UP Office-Hashimpur-Bokul Tola Bazar road (Ch.1000-2000m)
|
RIDP-CBC
|
matlab (uttar)
|
|
1.00
|
|
|
13.33
|
M.R. Chnstruction
|
12.93
|
|
11/01/2016
|
02/02/2016
|
100
|
|
|
|
|
329
|
RIDP(CBC)/Ch-M89 ID: 413764075
|
Maintenance (Overlay) of Eklaspur UP Office - Hasimpur - Bakultala Bazar Road ( Ch. 00 - 1000 m) Road ID No. 413764075 ID No. 52763
|
RIDP-CBC
|
matlab (uttar)
|
|
1.00
|
|
|
21.50
|
M/S, Shahara Cormoparsion
|
21.54
|
|
09/06/2016
|
16/02/2017
|
100
|
|
|
|
|
330
|
RIDP(CBC)/Ch-M150 ID: 413764006
|
Periodic Maintenance Overlayof Ludhuya bazar to Goalbaour Naburkandi Road ID No. 413764006 from Ch. 00 to 2138m
|
RIDP-CBC
|
matlab (uttar)
|
|
2.14
|
|
|
75.48
|
M/S. Sundorbon
|
75.64
|
|
18/02/2018
|
25/10/2018
|
100
|
|
|
|
|
331
|
RIDP(CBC)/Ch-W8 ID : 413763019
|
Improvement of Modaffor Bazar-Eklaspur Up Office Road (Ch. 800-1800m) Tender ID No. 17778
|
RIDP-CBC
|
matlab (uttar)
|
|
1.00
|
|
|
58.87
|
M.Builders
|
56.01
|
|
28/04/2015
|
02/11/2015
|
100
|
|
|
|
|
332
|
RIDP(CBC)/Ch-W48 ID : 413763023
|
Improvement of Ludua Amtoli Bazar-Shatnol UP Office (Kalipurpur) Via Olipur Madrasha road (Ch. 1550--2550m) ID No. 23940
|
RIDP-CBC
|
matlab (uttar)
|
|
1.00
|
|
|
58.63
|
M/S. Omi Traders
|
57.72
|
|
10/08/2015
|
15/02/2016
|
100
|
|
|
|
|
333
|
RIDP(CBC)/Ch-W74 ID: 413763025
|
Improvement of Islamia Bazar-Nadamdi Bazar Govt. Primary School-Eklashpur UP Office road (Ch. 1200-2200m) ID No. 36275
|
RIDP-CBC
|
matlab (uttar)
|
|
1.00
|
|
|
63.69
|
Techbay International
|
63.66
|
|
04/02/2016
|
10/08/2016
|
100
|
|
|
|
|
334
|
RIDP(CBC)/Ch-W75 ID: 413763013
|
Improvement of Gozra Bazar-Pachani Chowrasta Bazar-Eklashpur UP Office road (Ch. 3000-4000m) ID No. 36276
|
RIDP-CBC
|
matlab (uttar)
|
|
1.00
|
|
|
63.86
|
M.H Bablo
|
63.84
|
|
04/02/2016
|
10/08/2016
|
100
|
|
|
|
|
335
|
RIDP(CBC)/Ch-W83 ID: 413763018
|
Improvement of Mohonpur-Kalakanda UP Office-Sengachar GC Road (Ch. 1200-3000m) ID No. 36279
|
RIDP-CBC
|
matlab (uttar)
|
|
1.80
|
|
|
112.34
|
Sikder Enterprise
|
112.22
|
|
08/02/2016
|
30/04/2017
|
100
|
|
|
|
|
336
|
RIDP(CBC)/Ch-W92 ID: 413763023).
|
Construction of 3x4.00x4.00m RCC Box Culvert on Ludhua Amtoli Bazar-Shatnol UP Office (Kalipur) Via Olipur Madrasha Road at Ch. 2500m (Tender ID No. 43798)
|
RIDP-CBC
|
matlab (uttar)
|
|
|
|
|
22.90
|
Abu Bakkor Siddik
|
20.62
|
|
14/02/2016
|
12/07/2016
|
100
|
|
|
|
|
337
|
RIDP(CBC)/Ch-W166 ID: 413763025
|
Improvement of Islamia Bazar to Nedamdi Primary School to Eklashpur UP office Road from Ch. 00 to 1165m
|
RIDP-CBC
|
matlab (uttar)
|
|
1.17
|
|
|
78.27
|
M/S. M.H Bablo
|
78.18
|
|
18/07/2017
|
24/03/2018
|
100
|
|
|
|
|
338
|
RIDP(CBC)/Ch- W4 Road ID 413765029
|
Improvement of Shataki Bazar-Shataki Village-Roston Market Road ( Ch. 00-50m & 220-370m) (b) Porticion Work at on Same road
|
RIDP-CBC
|
matlab (uttar)
|
|
0.20
|
|
|
19.78
|
M/S. Shohagi Enterprise
|
16.61
|
|
11/12/2014
|
10/10/2015
|
100
|
|
|
|
|
339
|
RIDP(CBC)/Ch-SW4 Road ID 413765074
|
Improvement of Vandaria bazar-Putiapar (Including 250m Mosque link Road) Pucca Road (Ch. 00-1000m) Tender ID No. 16439
|
RIDP-CBC
|
matlab (uttar)
|
|
1.00
|
|
|
54.47
|
M/S. Baby Traders
|
56.61
|
|
22/03/2015
|
29/09/2016
|
100
|
|
|
|
|
340
|
RIDP(CBC)/Ch-W6 Road ID : 413764083
|
Improvement of Durgapur Bazar-Anandha Bazar-Ghasherchar road (Ch. 1000-2350m) Tender ID No.17775
|
RIDP-CBC
|
matlab (uttar)
|
|
1.35
|
|
|
77.46
|
M. Builders
|
73.74
|
|
28/04/2015
|
03/12/2015
|
100
|
|
|
|
|
341
|
RIDP(CBC)/Ch-W7 Road ID : 413765124
|
Improvement of Noyanagar Berrybund-Hasimpur Mathavanga road (Ch. 00-1200m) Tender ID No. 21045
|
RIDP-CBC
|
matlab (uttar)
|
|
1.20
|
|
|
59.39
|
M/S. Omi Enterprise
|
59.38
|
|
11/01/2016
|
03/12/2016
|
100
|
|
|
|
|
342
|
RIDP(CBC)/Ch-W50 Road ID: 413764085)
|
Improvement of Torkey Dewanji bari Govt. Primary School- Torkey Modhu Sarker bari-Torkey Arong road (Ch. 00-750m) ID No. 25614
|
RIDP-CBC
|
matlab (uttar)
|
|
0.75
|
|
|
38.47
|
M/S. Omil Tarders
|
38.45
|
|
10/08/2015
|
14/03/2016
|
100
|
|
|
|
|
343
|
RIDP(CBC)/Ch-W57 Road ID: 413764103)
|
Improvement of Nondolalpur-Sujatpur Pacca Road to Bataner Dokan-Islamabad Dasher Arong road (Ch. 00-500m) ID No. 27211
|
RIDP-CBC
|
matlab (uttar)
|
|
0.50
|
|
|
27.46
|
M/S. Irin Enterprise
|
26.07
|
|
06/09/2015
|
13/03/2016
|
100
|
|
|
|
|
344
|
RIDP(CBC)/Ch-W76 (Road ID: 413765157
|
Improvement of Depoti Secratory Muktijudda Mozammal Sarkar bari-Melarchar Joinal Sarkar bari road (Ch. 00-500m)ID No. 36277
|
RIDP-CBC
|
matlab (uttar)
|
|
0.50
|
|
|
23.68
|
M/S. Sumi Enterprise
|
23.67
|
|
08/02/2016
|
14/08/2015
|
100
|
|
|
|
|
345
|
RIDP(CBC)/Ch-W77 (Road ID: 413764106
|
Improvement of Pachani Chowrasta-Shatani Bittola road Via Biddot Office road (Ch. 00-750m) ID No. 36278
|
RIDP-CBC
|
matlab (uttar)
|
|
0.75
|
|
|
35.52
|
M/S. Sumi Enterprise
|
34.39
|
|
08/02/2016
|
04/12/2016
|
100
|
|
|
|
|
346
|
RIDP(CBC)/Ch-W84 (Road ID: 413764105
|
Improvement of Mohonpur-Modaffar Bazar-Bariband Loni Mize bari Road (Ch. 00-800m) ID No. 36280
|
RIDP-CBC
|
matlab (uttar)
|
|
0.80
|
|
|
41.51
|
M/S. Omi Enterprise
|
41.50
|
|
08/02/2016
|
07/08/2017
|
100
|
|
|
|
|
347
|
RIDP(CBC)/Ch-W17 Road ID : 413764040
|
Improvement of Naori Bazar-Chowrasta Bazar Road (Ch. 00-1000m) Tender ID No. 18795
|
RIDP-CBC
|
matlab (uttar)
|
|
1.00
|
|
|
44.35
|
M/S. Baby Traders
|
41.69
|
|
20/04/2015
|
09/01/2016
|
100
|
|
|
|
|
348
|
RIDP(CBC)/Ch-W60 Road ID : 413764091
|
Improvement of Shatnal DC road -Abu Market BWDB Bandgh via Purba Shatnal road from Ch. 00-500m ID No. 27826
|
RIDP-CBC
|
matlab (uttar)
|
|
0.50
|
|
|
24.08
|
M/S. Amena International
|
22.38
|
|
17/09/2015
|
24/03/2016
|
100
|
|
|
|
|
349
|
RIDP(CBC)/Ch-W167 Road ID : 413764103
|
Improvement of Nandalalpur to Sujatpur pacca road at Baten Dokani Modda Islamabd Dasher Arong road from Ch.1200m to 1960m and ID No. 112527
|
RIDP-CBC
|
matlab (uttar)
|
|
0.76
|
|
|
50.29
|
M/S. Irin Enterprise
|
49.04
|
|
27/09/2017
|
03/06/2018
|
100
|
|
|
|
|
350
|
RIDP(CBC)/Ch-W105 Road ID : 413765098
|
a) Improvement of Thatalia GCCR - Fatepur UP Office road ( Ch:000 - 650 m, Road ID No. 413764046) and b) Improvement of Fatepur Nadir par - Thadalia bridge road ( Ch: 750.00 - 1580.00 m, ID NO. 52470
|
RIDP-CBC
|
matlab (uttar)
|
|
0.65
|
|
|
99.33
|
M/S. Mamun Enterprise
|
95.77
|
|
11/08/2016
|
18/04/2017
|
100
|
|
|
|
|
351
|
RIDP(CBC)/ Ch-W32 Road ID: 413765130
|
Improvement of Nichantapur Bazar(College)-Mithurkandi road (Ch. 00-600m) Tender ID No. 19584
|
RIDP-CBC
|
matlab (uttar)
|
|
0.60
|
|
|
33.77
|
M/S. Baby Traders
|
33.77
|
|
12/05/2015
|
05/03/2016
|
100
|
|
|
|
|
352
|
RIDP(CBC)/Ch-W42 Road ID: 413765123
|
Improvement of Fazlul Haque Miji house pucca road-Nuruddin Patwary house road (Ch. 00-640m) ID No. 22661
|
RIDP-CBC
|
matlab (uttar)
|
|
0.64
|
|
|
28.79
|
M/S. Arifa Enterprise
|
27.02
|
|
08/06/2015
|
15/12/2015
|
100
|
|
|
|
|
353
|
RIDP(CBC)/Ch-W59 Road ID: 413765029
|
Improvement of Shataki Bazar-Shataki Village-Rostom Market road from (Ch. 545-1045m) ID No. 29754
|
RIDP-CBC
|
matlab (uttar)
|
|
0.50
|
|
|
25.89
|
Tacba International
|
22.78
|
|
20/10/2015
|
27/11/2016
|
100
|
|
|
|
|
354
|
RIDP(CBC)/Ch-W87 ID: 413765158
|
Improvement of Haniarpara village Mofajjal bapari house-Baluchar Pucca road (Ch. 00-1100m)
|
RIDP-CBC
|
matlab (uttar)
|
|
1.10
|
|
|
53.01
|
M/S. Omi Enterpeise
|
52.90
|
|
04/02/2016
|
08/12/2016
|
100
|
|
|
|
|
355
|
RIDP(CBC)/Ch-W90 ID: 413765050).
|
Improvement of Ludhua Ghuabard-South Ludhua Govt. Pry. School road (00-1415m) (b) Construction of 2.00x2.00m RCC Culvert at Ch. 1005m on Same road ID No. 43795
|
RIDP-CBC
|
matlab (uttar)
|
|
1.42
|
|
|
87.54
|
M/S, Sundorbon
|
87.34
|
|
23/02/2016
|
05/03/2017
|
100
|
|
|
|
|
356
|
RIDP(CBC)/Ch-W91 ID: 413764044
|
Construction of 2x4.00x4.00m & 2x3.50x3.50m RCC Culvert on Shahabajkandi GCCR-Vati Rasulpur Govt. Pry School GPS BWDB road at Ch. 426m, 609m ID No. 43797
|
RIDP-CBC
|
matlab (uttar)
|
|
|
|
|
32.46
|
M/S, Sundorbon
|
32.25
|
|
23/02/2016
|
01/11/2016
|
100
|
|
|
|
|
357
|
RIDP(CBC)/Ch-W102 ID: 413764103
|
Improvement of Nandalalpur-Sujatpur Pacca road Baten Dokan-Modda Islamabad Dasher Arong road at Ch. 500-1200m)
|
RIDP-CBC
|
matlab (uttar)
|
|
0.70
|
|
|
48.42
|
M/S. Irin Enterprise
|
48.35
|
|
13/04/2016
|
20/12/2016
|
100
|
|
|
|
|
358
|
RIDP(CBC)/Ch.W-122 ID: 413765159
|
Improvement of Raipur Islamabad - North Islamabad Mosque ( Ch.000-1000m
|
RIDP-CBC
|
matlab (uttar)
|
|
1.00
|
|
|
55.08
|
M/S. Akkas Construction
|
54.59
|
|
06/12/2016
|
12/08/2017
|
100
|
|
|
|
|
359
|
RIDP(CBC)/Ch-W103 ID No. 413765086 ID No. 413765044
|
(a) Improvement of Eklahpur Hospital - Bachchu Prodhan bari road ( ch. 000 - 720 m) and (b) Improvement of Hasimpur - Jolil Gazi bari - Noyanagar Mosque road ( ch. 000 - 400 m)
|
RIDP-CBC
|
matlab (uttar)
|
|
1.12
|
|
|
55.46
|
M/S. Shahara Corporation
|
53.09
|
|
24/04/2016
|
31/12/2016
|
100
|
|
|
|
|
360
|
RIDPCBC/Ch-BW5 Road ID No.413765162
|
Construction of 51.00 m RCC Girder Bridge on Lodhua Hospital to Shahabaj kandi road at Ch.800m
|
RIDP-CBC
|
matlab (uttar)
|
|
|
|
|
204.62
|
M/S. Ahsan Habib
|
204.57
|
|
03/08/2017
|
02/03/2018
|
100
|
|
|
|
|
361
|
RIDP(CBC)/Ch-W73 Road ID: 413764088
|
Improvement of Kalipur-Kamlakandi road-Barivanga-Kalipur-Imampur-Lalpur DC road from (Ch. 00-1175m) ID No. 33707
|
RIDP-CBC
|
matlab (uttar)
|
|
1.07
|
|
|
65.48
|
Applo Enginering & Construction Ltd
|
54.68
|
|
03/01/2016
|
10/07/2016
|
45
|
|
|
|
|
362
|
RIDP(CBC)/Ch.W199 ID No 413764119
|
Improvement of Shikarikandi to Sengarchar Bazar Pacca Road to Pathanbazar Road from Ch.00 to 1455m
|
RIDP-CBC
|
matlab (uttar)
|
|
1.46
|
|
|
95.98
|
Mizanur Rahman Liton
|
101.70
|
|
08/05/2018
|
14/01/2019
|
20
|
|
|
|
|
363
|
RIDP(CBC)/Ch.W201 ID No 413764108
|
Improvement of Torkey Hatikata (Mannan Hazi House) to Utta torkey hakim miyar mill ghar road from Ch.00 to 1413m
|
RIDP-CBC
|
matlab (uttar)
|
|
1.41
|
|
|
112.32
|
M/S. Liberty Traders
|
112.31
|
|
17/04/2018
|
16/12/2018
|
45
|
|
|
|
|
364
|
RIDP(CBC)/Ch-W202 ID No 413765102
|
a) Improvement of Shujatpur bazarMukul Bekari to Uttar Islamabad Reg.School road from Ch. 00 to 1316m b) Construction of 2 nos culvert and 2nos U-Drain Total length8.5m on the same road
|
RIDP-CBC
|
matlab (uttar)
|
|
1.32
|
|
|
96.12
|
M/S. Irin Enterprise
|
99.44
|
|
03/04/2018
|
09/12/2018
|
55
|
|
|
|
|
365
|
RIDP(CBC)/Ch-W203 ID No 413765145
|
Improvement of Uttar Torkey Pacca road to Shibpur wapda Beribandh road from Ch. 00 to 1555m
|
RIDP-CBC
|
matlab (uttar)
|
|
1.56
|
|
|
115.17
|
M/S. Liberty Traders
|
115.13
|
|
17/04/2018
|
16/12/2018
|
40
|
|
|
|
|
366
|
RIDP(CBC)/Ch-W85
|
Improvement of Upazila H/Q- Shibpur Road (Ch. 9100-10700m) ID No. 38014
|
RIDP-CBC
|
shahrasti
|
413952001).
|
1.60
|
0.00
|
0
|
12315122.00
|
Md. Ahsan Habib Aurun
|
11244700.00
|
31/01/2016
|
31/01/2016
|
07/08/2016
|
25
|
0.00
|
0
|
01/02/2017
|
|
367
|
RIDP(CBC)/Ch-W99
|
Improvement of Raysree(N) UP office H/Q-Ullashar Bazar road (Ch. 1000-2850m) Under Shahrasti Upazila, Dist. Chandpur (Road ID: 413953005). (ID No. 45853)
|
RIDP-CBC
|
shahrasti
|
413953005
|
1.85
|
0.00
|
0
|
11996243.00
|
M/S. Shekander Enterprise
|
11720579.00
|
09/04/2016
|
09/04/2016
|
26/12/2016
|
35
|
0.00
|
0
|
01/02/2017
|
|
368
|
RIDP(CBC)/Ch-W85 (Road ID: 413952001)
|
Improvement of Upazila H/Q- Shibpur Road (Ch. 9100-10700m)
|
RIDP-CBC
|
shahrasti
|
|
1.60
|
|
|
123.15
|
Md. Ahsan Habib Aurun
|
112.45
|
|
31/01/2016
|
07/08/2016
|
100
|
|
|
|
|
369
|
RIDP(CBC)/Ch-W36 Road ID: 413953004
|
Improvement of Suchipara(N) UP Office-Chetoshi Bazar Via Monipur Primary School Road (Ch. 1000-2000m) Tender ID No. 21559
|
RIDP-CBC
|
shahrasti
|
|
1.00
|
|
|
55.82
|
M/S. Faysal Enterprise
|
53.03
|
|
23/08/2015
|
20/12/2016
|
100
|
|
|
|
|
370
|
RIDP(CBC)/Ch-W37 Road ID: 413953016
|
Improvement of Suchipara(S) UP Office-Digdair Bazar Road Via Lotra Bazar Road (Ch. 700-2000m) Tender ID No. 21560
|
RIDP-CBC
|
shahrasti
|
|
1.30
|
|
|
75.69
|
M/S. Faysal Enterprise
|
74.18
|
|
08/06/2015
|
10/05/2016
|
100
|
|
|
|
|
371
|
RIDP(CBC)/Ch.W-141 ID No. 413953011 ID No. 413953015
|
a) Improvement of Jadabpur Bazar-Chandipur-Unkila bazar(Roysree North U.P Head Quarter) Road (Ch.900- 1400m, and b) Improvement of Suchipara (South) UP office-Keshranga-Noring pur bazar via Dashna para road (Ch.2070 - 2570m,
|
RIDP-CBC
|
shahrasti
|
|
1.00
|
|
|
71.49
|
M/S. Farik Enterprise
|
70.94
|
|
05/02/2017
|
05/10/2017
|
100
|
|
|
|
|
372
|
RIDP(CBC)/Ch-W99 Road ID: 413953005
|
Improvement of Raysree(N) UP office H/Q-Ullashar Bazar road (Ch. 1000-2850m) (ID No. 45853)
|
RIDP-CBC
|
shahrasti
|
|
1.85
|
|
|
119.96
|
M/S. Shekander Enterprise
|
117.21
|
|
19/04/2016
|
30/05/2017
|
100
|
|
|
|
|
373
|
RIDP(CBC)/Ch-W154 Road ID: 413953010
|
Improvement of Chitoshi (e) UP Office-Khaarihor Bazar road via Kadra Bzar road (Ch. 00-800m)
|
RIDP-CBC
|
shahrasti
|
|
0.80
|
|
|
59.78
|
M/S. Patwary Enterprise
|
60.24
|
|
03/05/2017
|
02/01/2018
|
65
|
|
|
|
|
374
|
RIDP(CBC)/Ch-W35 Road ID: 413954002
|
Improvement of Dasua-Taralia road (Ch. 00-400m) Tender ID No.26344
|
RIDP-CBC
|
shahrasti
|
|
0.40
|
|
|
20.55
|
M/S. Arifa Enterprise
|
19.21
|
|
05/08/2015
|
22/04/2016
|
100
|
|
|
|
|
375
|
RIDP(CBC)/Ch-W51 Road ID: 413954099
|
Improvement of Shahid Abul Kashem Road-Suchipara(N) UP office-Shorsak bazar road (Ch. 3640-4640m) ID No. 25615
|
RIDP-CBC
|
shahrasti
|
|
1.00
|
|
|
54.86
|
M/S. Gulshan International
|
47.10
|
|
28/07/2015
|
05/03/2016
|
100
|
|
|
|
|
376
|
RIDP(CBC)/Ch-W97 Road ID: 413954040 Road ID: 413954065
|
(a) Improvement of Rajapur R & H-Dopalla Bazar road (Ch. 00-500m) (b) Improvement of Kaliapara-Nayanagar-Baniachow road (Kaliapara-Baniachow-Debpur via post Office) road (Ch. 00-500m)
|
RIDP-CBC
|
shahrasti
|
|
1.00
|
|
|
52.91
|
M/S. Sanim Enterprise
|
51.54
|
|
05/04/2016
|
12/12/2016
|
100
|
|
|
|
|
377
|
RIDP(CBC)/Ch-W98 Road ID: 413954036
|
Improvement of Tamta FWC-Simna road (Ch. 150-1000m)
|
RIDP-CBC
|
shahrasti
|
|
0.85
|
|
|
521.37
|
M/S. Shohag Enterprise
|
50.58
|
|
13/04/2016
|
20/12/2016
|
100
|
|
|
|
|
378
|
RIDP(CBC)/Ch-W100 Road ID: 413954052
|
Improvement of Juginagar-Poranpur road (Ch. 00-1000m)
|
RIDP-CBC
|
shahrasti
|
|
1.00
|
|
|
55.17
|
M/S. Ratul Enterprise
|
51.64
|
|
17/04/2016
|
24/12/2016
|
100
|
|
|
|
|
379
|
RIDP(CBC)/Ch-W155 Road ID: 419354100
|
Improvement of Shibpur-Sahed Bazar Via Vatnikhpla road Ch. 00-800m
|
RIDP-CBC
|
shahrasti
|
|
0.80
|
|
|
51.02
|
M/S. Bangladesh Construction
|
47.27
|
|
19/03/2017
|
26/11/2017
|
100
|
|
|
|
|
380
|
RIDP(CBC)/Ch-W156 Road ID: 419354026
|
Improvement of Moutabari-Horipur bazar road Ch. 500-1250m
|
RIDP-CBC
|
shahrasti
|
|
0.75
|
|
|
49.85
|
M/S. Bangladesh Construction
|
45.58
|
|
19/03/2017
|
26/11/2017
|
100
|
|
|
|
|
381
|
RIDP(CBC)/Ch-W121 Road ID: 413954026
|
Improvement of Moutabari R&H - Haripur Bazar Road ( Ch. 00-500m)
|
RIDP-CBC
|
shahrasti
|
|
0.50
|
|
|
31.17
|
M/S. Bangladesh Construction
|
27.94
|
|
21/09/2016
|
28/05/2017
|
100
|
|
|
|
|
382
|
RIDP(CBC)/Ch-W35 ID: 413954002
|
Improvement of Dasua-Taralia road (Ch. 00-400m) Tender ID No.26344
|
RIDP-CBC
|
shahrasti
|
|
0.40
|
|
|
20.55
|
M/S. Arifa Enterprise
|
19.21
|
|
05/08/2015
|
22/04/2016
|
100
|
|
|
|
|
383
|
RIDP(CBC)/Ch-W38 Road ID: 413955096
|
Improvement of Panchail-Kadra Bazar road road (Ch. 00-500m) Tender ID No.33708
|
RIDP-CBC
|
shahrasti
|
|
0.50
|
|
|
31.78
|
M/S. Applo Enginering & Construction
|
27.51
|
|
03/01/2016
|
10/07/2016
|
20
|
|
|
|
|
384
|
RIDP(CBC)/Ch-W114 ID No.419355139
|
Improvement of Badiullah Bangti-Baoragir Bangti road (Ch. 1150-1650m) under Sharasti upazila, Dist. Chandpur ID No. 58066
|
RIDP-CBC
|
shahrasti
|
|
0.50
|
|
|
38.56
|
M/S. Faruq Enterprise
|
38.25
|
|
24/07/2016
|
01/04/2017
|
60
|
|
|
|
|
385
|
RIDP/(CBC)/Ch-W181 ID No.: 419354035 ID No. 413954073
|
a) Improvement of Thakur Bazar GC to Bijoypur bazar to Dahala Bazar Road from Ch.3360-3860m b) Improvement of Vabnabari Konar to Ahmmad Nogor Madrasha via Rajakha bazar road from Ch. 00 to 500m
|
RIDP-CBC
|
shahrasti
|
|
1.00
|
|
|
61.10
|
M/S. Raisa & Co.
|
60.72
|
|
26/02/2018
|
02/11/2018
|
15
|
|
|
|
|
386
|
RIDP(CBC)/ Ch-M35 ID: 413953001
|
Periodic Maintenance of Paranpur Balshid Badia-Raysree (N) Up office at Unkila via Thakur Bazar GC (Ch.6460-9030m) Tender ID No. 23872
|
RIDP-CBC
|
shahrasti
|
|
2.57
|
|
|
45.07
|
M/S. Shohag Enterprise
|
39.66
|
|
15/06/2015
|
30/04/2016
|
100
|
|
|
|
|
387
|
RIDP(CBC)/Ch-M35 Road ID: 413953001
|
Periodic Maintenance of Paranpur Balshid Badia-Raysree (N) Up office at Unkila via Thakur Bazar GC (Ch.6460-9030m)
|
RIDP-CBC
|
shahrasti
|
|
2.57
|
|
|
45.07
|
M/S. Shohag Enterprise
|
39.66
|
|
06/05/2015
|
30/04/2016
|
100
|
|
|
|
|
388
|
RTIP-II/CHA/RPM-43.1
|
Chandpur (Bagadi R&H)-Chandra GC
|
RTIP-2
|
chandpur-s
|
|
8.25
|
|
|
162.80
|
Mizanur Rahman Liton
|
175.28
|
|
20/02/2013
|
11/02/2014
|
100
|
|
|
|
|
389
|
RTIP-II/CHA/GCM-2
|
a) Improvement of Mohamaya GCM
|
RTIP-2
|
chandpur-s
|
|
2.00
|
|
|
85.82
|
Joint Venture of M/S. Aziz Brothers & Md. Mizanur Rahman Liton (JV of AB-MRL)
|
131.15
|
|
26/01/2015
|
28/12/2016
|
100
|
|
|
|
|
390
|
RTIP-II/CHA/RPM-180
|
b) Kallayanpur UP (Baburhat G.C)-Upazila H/Q (Bishnadi) Road via Kasim Bazar.
|
RTIP-2
|
chandpur-s
|
|
5.68
|
|
|
134.78
|
|
0.00
|
|
06/05/2015
|
30/05/2017
|
100
|
|
|
|
|
391
|
CHA/UNR-4
|
(A) Improvement of Latifgonj Bazar-Paschim Subidpur UP (Uttali) Road via Guher Bazar (Faridgonj Upazila). (B) Improvement of Khila Bazar (Khila Eidgah)-Shahrasti Bazar Road via Gabtoli (Shahrasti Upazila). (C) Improvement of Matlab-Master Bazar Ghosherhat Road (Matlab South Upazila)
|
RTIP-2
|
faridganj
|
|
13.40
|
0.00
|
100
|
82130047.00
|
Mohammed Eunus & Brothers (Pvt.) Ltd
|
93610298.80
|
13/10/2014
|
20/10/2014
|
30/06/2017
|
100
|
50.00
|
100
|
08/04/2019
|
|
392
|
CHA/RPM-179
|
Rehabilitation and periodic Maintenance of Faridgonj R&H-Rampur GC-Sollakhali R&H Road (Ch-0+000 15+475km)
|
RTIP-2
|
faridganj
|
0
|
15.48
|
0.00
|
36
|
43500000.00
|
Appolo Engineering Constraction Ltd
|
34243541.50
|
04/06/2015
|
11/06/2015
|
30/04/2017
|
75
|
4183000.00
|
36
|
08/04/2019
|
|
393
|
CHA/RPM-339
|
Rehabilitation and periodic Maintenance of Faridganj GC-Chandra GC Road at (Ch.0+000 - 9+350km)
|
RTIP-2
|
faridganj
|
0
|
9.35
|
0.00
|
|
66147557.00
|
0
|
0.00
|
|
|
|
0
|
|
|
01/02/2017
|
|
394
|
RTIP-II/CHA/UNR-4
|
a) Latifgonj Bazar-Paschim Subidpur UP (Uttali) Road via Guher Bazar
|
RTIP-2
|
faridganj
|
|
4.70
|
|
|
274.18
|
M/S. Mohammad Eunus & Brothers (Pvt), Ltd
|
910.87
|
|
26/10/2014
|
30/06/2017
|
100
|
|
|
|
|
395
|
RTIP-II/CHA/RPM-43.2
|
Faridganj GC-Rupsha GC
|
RTIP-2
|
faridganj
|
|
5.40
|
|
|
89.76
|
M/S. Aziz & Brothers
|
98.25
|
|
24/02/2013
|
05/05/2014
|
100
|
|
|
|
|
396
|
RTIP-II/CHA/RPM-179
|
Faridgonj R&H-Rampur GC-Sollakhali R&H Road
|
RTIP-2
|
faridganj
|
|
15.48
|
|
|
419.76
|
Appollo Engineering & Construction Ltd.
|
342.44
|
|
11/06/2015
|
30/04/2017
|
75
|
|
|
|
|
397
|
RTIP-II/CHA/RPM-339
|
Faridganj GC-Chandra GC Road.
|
RTIP-2
|
faridganj
|
|
9.35
|
|
|
661.48
|
Mohammed Eunus & Brothers (Pvt.) Ltd
|
616.82
|
|
19/02/2017
|
30/06/2018
|
94
|
|
|
|
|
398
|
CHA/UZR-96.1
|
Improvement of Chandpur puran bazar (Nayani bazar)-Haimchar-Charbhairabi Road (ch. 0+ 000-6+953km)
|
RTIP-2
|
haimchar
|
0
|
6.95
|
0.00
|
69
|
106702459.00
|
M/S Paradise Tra. & Mashiure Rahman JV
|
99269796.17
|
31/01/2017
|
07/02/2017
|
14/03/2018
|
85
|
0.00
|
69
|
08/04/2019
|
|
399
|
CHA/UZR-96.2
|
Improvement of Chandpur puran bazar (Nayani bazar)-Haimchar-Charbhairabi Road (ch. 6+953-12+083km)
|
RTIP-2
|
haimchar
|
0
|
5.13
|
0.00
|
24
|
89452696.00
|
Mashiure Rahman Chowdhury
|
83394637.80
|
31/01/2017
|
07/02/2017
|
14/03/2018
|
52
|
0.00
|
24
|
08/04/2019
|
|
400
|
RTIP-II/CHA/UZR-96.1
|
Chandpur Puran bazar-Haimchar-Charbhairabi Road (Haimchar Part)
|
RTIP-2
|
haimchar
|
|
6.95
|
|
|
1067.02
|
M/S. Paradise Traders & Moshiur Rahman Chowdhury JV
|
992.70
|
|
07/02/2017
|
30/06/2018
|
81
|
|
|
|
|
401
|
RTIP-II/CHA/UZR-96.2
|
Chandpur Puran bazar-Haimchar-Charbhairabi Road (Haimchar Part)
|
RTIP-2
|
haimchar
|
|
5.13
|
|
|
894.53
|
Moshiur Rahman Chowdhury
|
833.95
|
|
07/02/2017
|
30/06/2018
|
49
|
|
|
|
|
402
|
RTIP-II/CHA/RPM-138
|
b) Charbharabi U.P Office-Shahorali Mour road
|
RTIP-2
|
haimchar
|
|
3.05
|
|
|
72.51
|
|
0.00
|
|
25/05/2014
|
19/07/2015
|
100
|
|
|
|
|
403
|
RTIP-II/CHA/RPM-340
|
Haimchar Upazila H/Q-Madina market R&H via Ananda bazar Road.
|
RTIP-2
|
haimchar
|
|
5.12
|
|
|
358.86
|
RAB-RC (PVT) Limited-M/S. Patwary Construction (JV)
|
328.78
|
|
06/02/2017
|
11/12/2017
|
100
|
|
|
|
|
404
|
CHA/UZR-45
|
Improvement of Belchow-Ramchandrapur-Sameshpur-Nadighat road (Ch. 00-7+785km)
|
RTIP-2
|
haziganj
|
0
|
7.75
|
0.00
|
100
|
107632405.00
|
RBL-HBZT JV
|
106375347.00
|
08/03/2015
|
15/03/2015
|
05/09/2016
|
100
|
102828000.00
|
100
|
01/02/2017
|
|
405
|
RTIP-II/CHA/UZR-45
|
Belchow-Ramchandrapur-Sameshpur-Nadighat road.
|
RTIP-2
|
haziganj
|
|
7.75
|
|
|
1076.32
|
RBL-HB-ZT JV
|
1063.23
|
|
15/03/2015
|
16/12/2015
|
100
|
|
|
|
|
406
|
RTIP-II/CHA/RPM-45.2
|
Balakhal-Rampur-Narayanpur
|
RTIP-2
|
haziganj
|
|
5.35
|
|
|
157.46
|
M/S. Amena International
|
163.92
|
|
18/02/2013
|
08/12/2013
|
100
|
|
|
|
|
407
|
CHA/RPM-334
|
Rehabilitation and periodic Maintenance of Sachar-Bardali-Nayergoan Road (Kachua Portion) at (Ch.0+000 - 5+830km)
|
RTIP-2
|
kachua
|
0
|
5.83
|
0.00
|
0
|
30720866.00
|
A A Trading Corporation
|
26586446.40
|
23/06/2016
|
30/06/2016
|
30/06/2017
|
20
|
0.00
|
0
|
30/01/2017
|
|
408
|
RTIP-II/CHA/RPM-139
|
a) Kachua-Raghunathpur G.C road
|
RTIP-2
|
kachua
|
|
6.50
|
|
|
112.71
|
JV of Tania & Shahid
|
123.56
|
|
01/04/2014
|
11/06/2015
|
100
|
|
|
|
|
409
|
RTIP-II/CHA/RPM-181
|
b) Asrafpur (Kathal bagan)-Jagatpur bazar road. Via Asrafpur UP
|
RTIP-2
|
kachua
|
|
3.83
|
|
|
117.84
|
|
0.00
|
|
14/06/2015
|
10/02/2019
|
0
|
|
|
|
|
410
|
RTIP-II/CHA/RPM-334
|
Sachar-Bardail-Nayergoan road (Kachua portion)
|
RTIP-2
|
kachua
|
|
5.83
|
|
|
307.21
|
A.A Trading Construction
|
265.87
|
|
30/06/2016
|
12/08/2017
|
41
|
|
|
|
|
411
|
RTIP-II/CHA/RPM-337
|
Pathair-Mazigacha-Nandanpur bazar road.
|
RTIP-2
|
kachua
|
|
4.96
|
|
|
265.71
|
Pioneer Construction
|
254.16
|
|
06/02/2017
|
30/06/2018
|
59
|
|
|
|
|
412
|
Cha/RPM-181
|
Rehabilitation and Periodic Maintenance of (a) Nayergaon-Bordol Shachar via Pitambordi Road (Matlab South part) (Ch. 0+700 to 6+065km) Upazila: Matlab Dakshin, Chandpur. (b) Asrafpur (Kathal bagan)-Jagatpur bazar road via Asrafpur UP road (Ch. 0+000 to 3+825km) Upazila: Kachua, Chandpur
|
RTIP-2
|
matlab (dakshin)
|
|
9.19
|
0.00
|
31
|
33171838.00
|
M/S. R-TA Enterprise
|
30726921.00
|
04/06/2015
|
14/06/2015
|
30/04/2019
|
69
|
0.00
|
31
|
08/04/2019
|
|
413
|
CHA/RPM-140
|
Rehabilitation and periodic Maintenance of Machuakhal-Narayanpur-Balakhal road (Ch. 1+425 to 11+880km)
|
RTIP-2
|
matlab (dakshin)
|
0
|
8.81
|
0.00
|
86
|
15836569.00
|
Mohammed Eunus & Brothers (Pvt.) Ltd.
|
17412061.91
|
24/03/2014
|
01/04/2014
|
30/06/2015
|
100
|
14913000.00
|
86
|
01/02/2017
|
|
414
|
RTIP-II/CHA/UNR-4
|
c) Matlab-Master Bazar Ghosherhat Road
|
RTIP-2
|
matlab (dakshin)
|
|
4.53
|
|
|
321.89
|
|
0.00
|
|
26/10/2014
|
30/06/2017
|
100
|
|
|
|
|
415
|
RTIP-II/CHA/RPM-140
|
Machuakhal-Narayanpur-Balakhal road
|
RTIP-2
|
matlab (dakshin)
|
|
8.81
|
|
|
158.37
|
Mohammed Eunus & Brothers (Pvt.) Ltd.
|
174.12
|
|
01/04/2014
|
01/04/2015
|
100
|
|
|
|
|
416
|
RTIP-II/CHA/GCM-2
|
b) Improvement of Chengarchar GCM
|
RTIP-2
|
matlab (dakshin)
|
|
2.00
|
|
|
79.64
|
|
0.00
|
|
26/01/2015
|
28/12/2016
|
100
|
|
|
|
|
417
|
RTIP-II/CHA/RPM-181
|
a) Nayergaon-Bordol Shachar via pitambordi Road (Matlab South part)
|
RTIP-2
|
matlab (dakshin)
|
|
5.37
|
|
|
213.88
|
M/S. R-TA Enterprise
|
332.37
|
|
14/06/2015
|
10/02/2019
|
0
|
|
|
|
|
418
|
RTIP-II/CHA/RPM-341
|
Bahari Arong-Munshirhat Road
|
RTIP-2
|
matlab (dakshin)
|
|
4.70
|
|
|
280.07
|
M/S. Sarkar Construction-M/S. Zakir Enterprise (JV)
|
276.47
|
|
06/02/2017
|
30/12/2017
|
100
|
|
|
|
|
419
|
CHA/RPM-182
|
Rehabilitation and periodic Maintenance of Matlab Bazar-Sengarchar Road (Ch-0+000 to 12+335km)
|
RTIP-2
|
matlab (uttar)
|
0
|
12.34
|
0.00
|
100
|
71500000.00
|
M/S Shahid & Brothers
|
70900427.35
|
29/06/2015
|
06/07/2015
|
18/01/2017
|
100
|
27381000.00
|
100
|
08/04/2019
|
|
420
|
CHA/RPM-335
|
Rehabilitation and periodic Maintenance of Sujatpur bazar-Pathan bazar-Shatnal UP office Road at (Ch.0+000 - 12+450km)
|
RTIP-2
|
matlab (uttar)
|
0
|
12.45
|
0.00
|
0
|
43759913.00
|
M/S Asif Trading
|
43733436.42
|
30/06/2016
|
08/07/2016
|
08/07/2017
|
30
|
0.00
|
0
|
30/01/2017
|
|
421
|
RTIP-II/CHA/RPM-44.1
|
Senganchar-Kalirbazar
|
RTIP-2
|
matlab (uttar)
|
|
6.00
|
|
|
149.40
|
M/S. Akkas Construction
|
162.50
|
|
18/02/2013
|
15/02/2014
|
100
|
|
|
|
|
422
|
RTIP-II/CHA/RPM-44.2
|
Senganchar-Kalirbazar
|
RTIP-2
|
matlab (uttar)
|
|
7.50
|
|
|
127.35
|
Mohammad Ali Zinnah
|
138.94
|
|
17/02/2013
|
16/02/2014
|
100
|
|
|
|
|
423
|
RTIP-II/CHA/RPM-138
|
a) Senganchar-Eklaspur road
|
RTIP-2
|
matlab (uttar)
|
|
8.10
|
|
|
142.97
|
M/S. Rathindra Chandra Roy & Md. Mizanur Rahman Liton Joint Venture (JV of RCR-MRL)
|
256.49
|
|
25/05/2014
|
19/07/2015
|
100
|
|
|
|
|
424
|
RTIP-II/CHA/RPM-182
|
Matlab Bazar-Sengarchar Road.
|
RTIP-2
|
matlab (uttar)
|
|
12.34
|
|
|
715.42
|
M/S. Shahid Brothers
|
708.87
|
|
06/07/2015
|
28/01/2017
|
100
|
|
|
|
|
425
|
RTIP-II/CHA/RPM-335
|
Sujatpur bazar-Pathanbazar-Shatnal UP Office road.
|
RTIP-2
|
matlab (uttar)
|
|
12.45
|
|
|
437.60
|
M/S. Asif Traders
|
433.94
|
|
08/07/2016
|
20/09/2017
|
100
|
|
|
|
|
426
|
RTIP-II/CHA/RPM-338
|
Gazra bazar-Pachani Chowrasta bazar-Eklashpur UP Office road.
|
RTIP-2
|
matlab (uttar)
|
|
2.75
|
|
|
195.84
|
M/S. Confidence International & M/S. M.H Bablu (JV)
|
194.38
|
|
01/02/2017
|
30/06/2018
|
100
|
|
|
|
|
427
|
CHA/UZR-49
|
Improvement of Thakur Bazar (U.H.C) GC-Jadabpur R&H Net work (ch. 5+ 375-7+125km)
|
RTIP-2
|
shahrasti
|
0
|
1.75
|
0.00
|
20
|
20969834.00
|
Appolo Engineering Constraction Ltd
|
18177488.12
|
05/11/2015
|
12/11/2015
|
07/08/2017
|
61
|
0.00
|
20
|
08/04/2019
|
|
428
|
RTIP-II/CHA/UZR-49
|
Thakur bazar (U.H.C) GC-Jadabpur R& H Net work.
|
RTIP-2
|
shahrasti
|
|
1.75
|
|
|
209.70
|
Appollo Engineering and Construction Ltd.
|
181.77
|
|
12/11/2015
|
22/04/2017
|
61
|
|
|
|
|
429
|
RTIP-II/CHA/UNR-4
|
b) Khila Bazar (Khila Eidgah)-Shahrasti Bazar Road via Gabtoli
|
RTIP-2
|
shahrasti
|
|
3.67
|
|
|
225.23
|
|
0.00
|
|
26/10/2014
|
30/06/2017
|
100
|
|
|
|
|
430
|
RTIP-II/CHA/RPM-45.1
|
Tamta U.P H/Q-Khorda Fery Ghat
|
RTIP-2
|
shahrasti
|
|
3.52
|
|
|
60.66
|
M/S. Zia Enterprise
|
65.01
|
|
24/02/2013
|
17/02/2014
|
100
|
|
|
|
|
431
|
RTIP-II/CHA/RPM-180
|
a) Shahid Anwar Hossain Road (Mehar North Up office-Debkara Bazar Via Bholdighi bazar)
|
RTIP-2
|
shahrasti
|
|
5.32
|
|
|
142.19
|
AB-MRL
|
269.01
|
|
06/05/2015
|
30/05/2017
|
100
|
|
|
|
|
432
|
RTIP-II/CHA/RPM-336
|
Chitoshi (w) U.P office-Shampur bazar road via Ugharia bazar
|
RTIP-2
|
shahrasti
|
|
3.94
|
|
|
255.64
|
Ahsan Habib Arun
|
235.02
|
|
21/03/2017
|
30/11/2018
|
100
|
|
|
|
|
433
|
138/176
|
Construction of RAMPUR UP Complex
|
UCCP-2
|
chandpur-s
|
|
|
|
100
|
87.00
|
|
90.95
|
07/04/2013
|
|
08/09/2015
|
100
|
86.71
|
100
|
01/09/2020
|
|
434
|
213/246
|
Construction of ashikhati up
|
UCCP-2
|
chandpur-s
|
|
|
|
100
|
59.00
|
|
57.54
|
15/03/2010
|
|
23/06/2011
|
100
|
57.08
|
100
|
15/07/2020
|
|
435
|
211/246
|
Construction of ibrahimpur up
|
UCCP-2
|
chandpur-s
|
|
|
|
100
|
42.00
|
|
50.12
|
23/07/2008
|
|
|
100
|
49.86
|
100
|
15/07/2020
|
|
436
|
210/246
|
Construction of moisadi up
|
UCCP-2
|
chandpur-s
|
|
|
|
100
|
59.00
|
|
52.84
|
05/05/2009
|
|
30/06/2012
|
100
|
52.76
|
100
|
15/07/2020
|
|
437
|
141/176
|
Construction of Rupsa (N) UP Complex
|
UCCP-2
|
faridganj
|
|
|
|
100
|
89.09
|
|
84.64
|
18/12/2013
|
|
30/06/2015
|
100
|
84.27
|
100
|
01/09/2020
|
|
438
|
w.192
|
Construction of 1 no. Rajargaon UP Complex
|
UCCP-2
|
haziganj
|
|
|
|
100
|
86.87
|
|
91.11
|
28/04/2013
|
|
30/09/2015
|
100
|
68.99
|
100
|
17/08/2020
|
|
439
|
w.008
|
Construction of 3. no Kalchow (n) UP Complex
|
UCCP-2
|
haziganj
|
|
|
|
100
|
90.24
|
|
94.60
|
21/04/2013
|
|
31/03/2015
|
100
|
94.57
|
100
|
17/08/2020
|
|
440
|
w.526
|
Construction of 9 no. gordabapur UP Complex
|
UCCP-2
|
haziganj
|
|
|
|
100
|
104.00
|
104
|
108.62
|
02/12/2017
|
|
01/09/2018
|
100
|
108.09
|
100
|
17/08/2020
|
|
441
|
214/246
|
Construction of hajiganj up
|
UCCP-2
|
haziganj
|
|
|
|
|
34.97
|
|
34.97
|
18/05/2005
|
|
|
15
|
5.25
|
|
15/07/2020
|
|
442
|
w.358
|
Construction of fatepur (w) UP Complex
|
UCCP-2
|
matlab (uttar)
|
|
|
|
100
|
98.27
|
|
97.07
|
09/07/2015
|
|
30/09/2018
|
100
|
97.06
|
100
|
17/08/2020
|
|
443
|
w.196
|
Construction of islamabad UP Complex
|
UCCP-2
|
matlab (uttar)
|
|
|
|
100
|
89.01
|
|
89.23
|
11/11/2012
|
|
17/03/2015
|
100
|
93.05
|
100
|
17/08/2020
|
|
444
|
139/176
|
Construction of SUCHIPARA UP Complex
|
UCCP-2
|
shahrasti
|
|
|
|
|
121.70
|
|
109.53
|
14/05/2017
|
|
30/08/2018
|
100
|
98.00
|
|
01/09/2020
|
|
445
|
w.586
|
Construction of tamta (uttar) UP Complex
|
UCCP-2
|
shahrasti
|
|
|
|
0
|
167.98
|
|
157.02
|
28/08/2019
|
|
27/05/2020
|
10
|
0.00
|
0
|
17/08/2020
|
|
446
|
w-57
|
Construction ofraysree (n) UP Complex
|
UCCP-2
|
shahrasti
|
|
|
|
0
|
124.71
|
|
110.17
|
19/11/2019
|
|
31/05/2020
|
15
|
0.00
|
0
|
17/08/2020
|
|
447
|
CBU-100/ Purto-270
|
চাঁদপুর জেলার ফরিদগঞ্জ উপজেলাধীন তুলাতলী বাজার-মদিনা বাজার সড়কে ৪০০০মিটারে চেইনেজে RCC ব্রিজ নির্মণ। (রোড আইডিঃ ৪১৩৪৫৩০৩৭)
|
UHBP
|
faridganj
|
413453037
|
|
63.00
|
0
|
479.69
|
Friends-Khan (JV)
|
476.49
|
22/07/2020
|
22/07/2020
|
30/06/2023
|
100
|
476.21
|
0
|
28/09/2024
|
|
448
|
CBU-100/ Purto-473
|
Access Road to the Construction of 63m long RCC Girder Bridge on Tulatoli Bazar-Modina Bazar at Ch. 4000m (Road ID 413453037) Upazila: Faridganj, District: Chandpur. (Total length 120m)
|
UHBP
|
faridganj
|
413453037
|
0.12
|
0.00
|
0
|
30.07
|
MS Farida Enterprise
|
28.02
|
01/01/1900
|
|
|
0
|
0.00
|
0
|
28/09/2024
|
|
449
|
CBU-100/ Purto-271
|
চাঁদপুর জেলার হাজিগঞ্জ উপজেলাধীন কাদলা প্রজেক্ট থেকে উওর গরেশ্বরের সড়কে পশ্চিম পার্শে বোয়ালজুড়ি খালের উপর RCC ব্রিজ নির্মাণ (রোড আইডিঃ ৪১৩৪৯৫০৯৬)
|
UHBP
|
haziganj
|
413495096
|
|
30.00
|
0
|
255.20
|
Friends-Faraji (JV)
|
223.40
|
22/07/2020
|
22/07/2020
|
30/09/2022
|
100
|
208.11
|
0
|
28/09/2024
|
|
450
|
CBU-100/ Purto-267
|
চাঁদপুর জেলার কচুয়া উপজেলাধীন সাচার বাজার ব্রিজ-রাজারামপুর ব্রিজ রোড আরএন্ডএইচ আরডি সড়কে ৩১১মিঃ চেইনেজে PSC সেতু নির্মাণ (রোড আইডিঃ ৪১৩৫৮৫২৭১)
|
UHBP
|
kachua
|
413585271
|
|
30.00
|
0
|
330.02
|
M/S. Kohinoor Enterprise AND Ahsan Habib Arun-(JV)
|
344.13
|
26/07/2020
|
26/07/2020
|
30/06/2024
|
95
|
291.74
|
0
|
28/09/2024
|
|
451
|
CBU-100/ Purto-441
|
চাঁদপুর জেলার মতলব(দক্ষিণ) উপজেলাধীন চাঁদপুর জেলা, উপজেলা মতলব(দঃ) গ্রাম-চর শিলিন্দা ও কুমিল্লা জেলা, উপজেলা-দাউদকান্দি, গ্রাম-দক্ষিণ নারানদিয়া দুই উপজেলার সংযোগ সড়কে ক্ষিরাই নদীর উপর (রোড আইডি-৪১৩৯৬৫০২২) সেতু নির্মাণ।
|
UHBP
|
matlab (dakshin)
|
413965022
|
|
88.00
|
0
|
831.32
|
NT-AB-MRL(JV)
|
913.70
|
01/01/1900
|
|
01/04/2025
|
20
|
75.55
|
0
|
28/09/2024
|
|
452
|
CBU-100/ Purto-272
|
চাঁদপুর জেলার শাহরাস্তি উপজেলাধীন শাহরাস্তি উপজেলাধীন কালীবাড়ী-বিশারা-নোয়াবপুর ফেরীঘাট রাস্তায় ৪৬০০মিটার চেইনেজে ডাকাতিয়া নদীর উপর PSC ব্রিজ নির্মাণ। রোড আইডিঃ ৪১৩৯৫৪০১৭)
|
UHBP
|
shahrasti
|
413954017
|
|
81.00
|
0
|
758.38
|
M/S. Surma Enterprise
|
794.14
|
23/07/2020
|
23/07/2020
|
25/02/2025
|
75
|
545.55
|
0
|
28/09/2024
|
|
453
|
UIIP-BC/PCO/W-345
|
A) Construction Work of RCC Road & Palisading work start from Kachua Hajigonj bypass Road H/O Osman Mia to Kariya domria road Kariya North Para Pokania Madrasa (Ch:0.00-275m) Link Osman Mia Bari Pond par (Ch:0.00-120.00m) Ward No-03&04 Under Kachua Pourashava Chandpur.
B) Construction Work of RCC Road from Kachua Bedpur Road to Kachua Nobabpur Road Ward No-08 Under Kachua Pourashava Chandpur. ( Ch:0.00-195.00m )
C) Construction Work of RCC Road from Kachua Dhan Bazar Bridge to Taj Tredars start from Dhan Bazer Bridge Ward No-08 Under Kachua Pourashava Chandpur. (Ch:0.00-166.00m)
D) Rehabilitation Work at Kariya Domoria Road start from Kachua Paranpur Road Mojumdar Bari Bridge to Kariya Rahim Councillor old Home (Ch:0.00-560.00m) Ward No-04 Under Kachua Pourashava Chandpur.
|
UIIP
|
kachua
|
|
1.26
|
0.00
|
100
|
131.18
|
m/s Tanim Traders
|
131.12
|
25/09/2021
|
30/09/2021
|
29/09/2022
|
100
|
130.59
|
100
|
09/10/2024
|
|
454
|
UIIP-BC/PCO/W-346
|
A) Rehabilitation Works at Kachua Sachar Road VIP Hospital to Kachua Taguria Road End of Poura Area (Ch: 0.00-1015.00m) Ward No-07 Under Kachua Pourashava Chandpur .
B) Construction Work of RCC Road at Kachua Bedpur road to Karish Bachu Mia Home (Ch:0.00-455.00m) & Link Road H/O Abdur Rab Master to Dr. Fajar Ali Home Pond North Side (Ch:0.00-190.00m) Ward No-08 Under Kachua Pourashava. Chandpur.
|
UIIP
|
kachua
|
|
1.96
|
0.00
|
100
|
87.07
|
M/S Shafiq Enterprise
|
82.88
|
03/02/2022
|
10/02/2022
|
08/02/2023
|
100
|
82.85
|
100
|
09/10/2024
|
|
455
|
UIIP-BC/PCO/W-347
|
A) Construction of RCC Drain From Kachua Sachar Road mor VIP Hospital to SR Office East site Near Khal (Ch:0.00m-126.00m) Ward No.-07 Under Kachua Pourashava Chandpur.
B) Construction of RCC Drain at Nurani Hotel Via Fish Market to Old Cow Market (Ch:0.00m-135.00m) Ward No.-08 Under Kachua Pourashava Chandpur.
C) Construction of RCC Drain From Kachua Upazila Prishad Road H/O Mizanur Rahman Near Existing RCC Drain End to H/O Edris Bakaul South Side Near Khal (Ch:0.00-195.00m) Ward No.-03 Under Kachua Pourashava Chandpur.
|
UIIP
|
kachua
|
|
|
0.00
|
100
|
96.15
|
M/S Kamal Enterprise
|
95.77
|
27/02/2022
|
02/03/2022
|
02/03/2023
|
100
|
95.46
|
100
|
09/10/2024
|
|
456
|
UIIP-BC/PCO/W-348
|
A) Construction of RCC Drain from Kachua Gulbahar CNG stand H/O Iqbal to Palashpur Masimpur Road (Ch:0.00-165.00m) Ward No.-03 Under Kachua Pourashava Chandpur.
B) Construction of RCC Drain starting from Kachua Post Office to Khal Adjacent H/O Abdul Momin Master (Ch:0.00-126.00m) Ward No.-08 Under Kachua Pourashava Chandpur.
|
UIIP
|
kachua
|
|
|
0.00
|
91
|
59.72
|
MIS Abdullah & Basher (JV)
|
58.77
|
16/03/2022
|
24/03/2022
|
22/03/2023
|
100
|
53.37
|
91
|
09/10/2024
|
|
457
|
UIIP-BC/PCO/W-467
|
A) Construction of Shed for Public Transport Passenger (28.00 sqm) under Under Kachua Pourashava, Chandpur.
B) Construction of One Storied Public Toilet (Type A=56 sqm) under Under Kachua Pourashava, Chandpur.
C) Construction of One Storied Vegetables & Agricultural Products Market of 5 Storied Foundation (Floor Area=314 sqm) under Under Kachua Pourashava, Chandpur.
|
UIIP
|
kachua
|
|
|
|
15
|
149.27
|
MS Ousmani and Brothers
|
143.23
|
20/02/2023
|
20/02/2023
|
30/12/2024
|
33
|
21.63
|
15
|
09/10/2024
|
|
458
|
UIIP-BC/PCO/W-569
|
(1) Construction of RCC Road by the side of kachua Upzilla Parishad Road From Preyotush Podder Shop To Kachua Hajigonj by Pass road .(Ch0.00~393.00m)and infront of Upzilla hospital ch(0.00-60.00) Under kachua pourashava,Chandpur.
(2) Improvement of BC Road from Kachua Gulbahar Road to Koachanpur Gazirpole Road ch 0.00-990.00 meter Ward no01-02 under kachau pourashava
|
UIIP
|
kachua
|
|
1.43
|
|
100
|
170.69
|
Jeet-Tanim (JV)
|
170.59
|
06/03/2023
|
10/03/2023
|
05/03/2024
|
100
|
170.49
|
100
|
09/10/2024
|
|
459
|
UIIP-BC/PCO/W-563
|
A) Improvement of BC Road from Kachua-Rogunanthpur Road Kachua Upzilla Hospital to end of Poura Area Ch.0.00-1500.00m Ward no-02 & 03 Kachua Pourashava, Chandpur.
B) Improvement of BC Road From Preyotush Podder Shop to Kariya Mojumdar Bari Bridge Ward No-05 (Ch.0.00-615.00m) Under Kachua Pourashava, Chandpur. (Salvage Amount-1,83,680.00)
|
UIIP
|
kachua
|
|
2.12
|
|
45
|
126.86
|
M/S Abdullah Enterprise
|
132.70
|
28/08/2023
|
03/08/2023
|
05/03/2024
|
71
|
60.37
|
45
|
09/10/2024
|
|
460
|
UIIP-BC/PCO/W-564
|
A) Improvement of RCC Drain Start from J.B Electric to Banoful Hotel ( Danbazar road) ch 0.00-37.00m link chal Bazar road 122.00m and Bisno pal hope to proposed bridge ch 0.00-43.00m ward no -08,under kachua pourashava
B) Improvement of Road by RCC Start from J.B Electric to Banoful Hotel ( Danbazar road) ch 0.00-37.00m link chal Bazar road 122.00m and Bisno pal hope to proposed bridge ch 0.00-43.00m ward no -08,under kachua pourashava
C)Improvement of RCC Road Start from Nurani hotel to chattel Market (Present Wood Market) ward no -08,under kachua pourashava
|
UIIP
|
kachua
|
|
0.32
|
|
100
|
87.27
|
M/S Tamim Traders
|
91.50
|
28/08/2023
|
03/09/2023
|
05/03/2024
|
100
|
91.08
|
100
|
09/10/2024
|
|
461
|
UIIP-BC/PCO/W-565
|
A) Improvement of Road and widening Work at Damaluya Baro bari Road Start From Kachua Taguria Road to Damaluya Baro bari Bridge ch (0.00-1000.00m) infornt of kamal Councillor Home and connected Hossanpur road (Ward No- 07), under Kachua Pourashava
B) Improvement work of RCC Road From Kachua Badpur road to kachua postoffice road .(Ch0.00~127.00m). Ward no -08 Under kachua pourashava,Chandpur.
|
UIIP
|
kachua
|
|
1.13
|
|
90
|
88.33
|
M/S Tanim Traders
|
92.53
|
28/08/2023
|
03/09/2023
|
05/03/2024
|
100
|
83.69
|
90
|
09/10/2024
|
|
462
|
UIIP/PCO/G-42
|
Implementation & Supply 602 nos Waste Basket (120 ltr) & 20 nos Non-motorized vehicle (van) under Kachua Pourashava District: Chandpur.
|
UIIP
|
kachua
|
|
|
|
0
|
39.98
|
RFL Plastrics Limited
|
30.23
|
|
|
|
0
|
0.00
|
0
|
09/10/2024
|
|
463
|
UIIP-BC/PCO/W-52
|
(a) Construction work of RCC Road & Retaining wall Start from Kachua Hajigong bypass via H/O Krisna patikor to Kariya Dumoria Road. Ward No-04 Under Kachua pourashava for the year of 2018-19.
(b) Construction work of RCC Road & Retaining wall from Kachua paranpur road to kariya H/O Shahidullah. Kariya eidgah road start from BC Road ward no-05 under Kachua pourashavafor the year of 1018-19.
|
UIIP
|
kachua
|
|
0.85
|
0.00
|
100
|
156.60
|
MAM Construction Ltd
|
136.24
|
12/08/2020
|
19/08/2020
|
31/03/2022
|
100
|
136.21
|
100
|
29/09/2022
|
|
464
|
UIIP-BC/PCO/W-53
|
(a) Construction work of RCC Road & Retaining wall Start from Kachua Gaulbahar Road to Baliyatoli Rahman hazi bari road. Ward no-01 Under Kachua Pourashava for the year of 2018-19. Ch. 0.00-0.215
b) Construction Work of RCC Road from Kachua Golbahar Road to H/O Abu Sofiyan via Baliyatoly pal Bari Jame mosque Road. Word no-01 under Dachua Pourashava for the year of 2018-19. Ch. 0.00- 0.395
(C) Construction work of RCC Road from Kachua Golbahar Road to h/o bachu mia start from Koachancipur guni mia cashiar home north side corner Word no-02 Under Kachua pourashava for the year of 2018-19.ch 00-270m
|
UIIP
|
kachua
|
|
0.85
|
0.00
|
100
|
105.99
|
MAM Construction Ltd
|
92.22
|
12/08/2020
|
19/08/2020
|
18/08/2021
|
100
|
92.19
|
100
|
29/09/2022
|
|
465
|
UIIP-BC/PCO/W-249
|
Rehaliation works and widening of Kachua Nababpur road by BC start from Karish Thakurbari pond par north site to end of poura area (ch 1060m-2405m) Under Kachua pourashava.
|
UIIP
|
kachua
|
|
1.35
|
0.00
|
100
|
89.77
|
M/S Renu mia
|
91.00
|
14/01/2021
|
|
19/01/2022
|
100
|
91.00
|
100
|
29/09/2022
|
|
466
|
UIIP-BC/PCO/W-250
|
Rehabilitation works and widening of Kachua Nababpur Road by BC start from Post Office to Karish thakurbari Pond Par (Ch. 000m-1060m) under Kachua Pourosava.
|
UIIP
|
kachua
|
|
1.06
|
0.00
|
100
|
83.37
|
M/S Renu mia
|
83.25
|
14/01/2021
|
|
19/01/2022
|
100
|
85.59
|
100
|
29/09/2022
|
|
467
|
UIIP-BC/PCO/W-251
|
(A) Construction Works of RCC Road & Retaining Wall from Kachua Bedpur Road to Karish Sirajdilar Home Road start fro Kachua Bedpur BC Road, ward no27-06 (Ch. 0.00m-215m) under Kachua Pourosava.
(B)Construction Works of RCC Road & Retaining Wall from Kachua Teguria Road to Dhamalua wet8324 Para miazi Bari (Ch. 0.00m-200m) under Kachua Pourosava.
|
UIIP
|
kachua
|
|
0.42
|
0.00
|
100
|
121.15
|
M/S Tanim Traders
|
100.38
|
24/01/2021
|
|
30/01/2022
|
100
|
100.19
|
100
|
29/09/2022
|
|
468
|
UIIP-BC/PCO/W-252
|
Construction of RCC U Drain with Cover Slab at Kachua Banga Bondhu Degree College North side Khal, ward no.-08 (Ch. 0.00-95.00m) under Kachua Pourosava.
|
UIIP
|
kachua
|
|
|
0.00
|
36
|
54.09
|
M/S Alif Enterprise
|
44.02
|
24/01/2021
|
|
30/01/2022
|
60
|
15.82
|
36
|
29/09/2022
|
|
469
|
UIIP-BC/PCO/W-456
|
A) Construction of Three Vent (5.00x4.00m) RCC Box Culvert on Kachua Shoe Maker Market near Khal (connecting road RCC Culvert Bridge) under Kachua Pourashava, Chandpur.
B) Construction of One Vent (4.00x5.00m) RCC Box Culvert on Karish Ismail Hafej Bari near Khal (Kachua to Nababpur road RCC Culvert) under Kachua Pourashava, Chandpur.
|
UIIP
|
kachua
|
|
|
19.00
|
0
|
88.19
|
Alamgir Hayder Bhuiya
|
83.64
|
09/05/2022
|
16/05/2022
|
16/05/2023
|
0
|
0.00
|
0
|
29/09/2022
|
|
470
|
UTMIDP- HAIM / CHAN/ WR-41
|
1. Improvement of RCC road (Rigid Pavement) of Babul Patwary House Jalamia Bari Road via Hossain Patwary Bari road at Ch. 00m-685m. Under Haimchar Upazila, Dist: Chandpur. (Road ID: 413475054). 2. Improvement of RCC road (Rigid Pavement) of Nurul Amin Sarder Bari Graveyard to Rampur Road via Yousuf Khan House road at Ch. 00m-707m. Under Haimchar Upazila, Dist: Chandpur. (Road ID: 413475092).
|
UTMIDP
|
haimchar
|
|
1.38
|
|
|
216.45
|
M/S Contemporary
|
202.00
|
|
|
|
0
|
|
|
|
|