1
|
BDIRWSP/BAR/AMT/DW-03
|
Widening & Strengthening of Amtali (AK High school) RHD- Gazipur GC via Talukder hat road at Ch. 740-3200m under Amtali Upazila, District-Barguna. Road ID No: 504092001. Salvage Materials Cost Tk. 520688.00
|
BDIRWSP
|
amtali
|
504092001
|
2.46
|
|
|
489.46
|
Barendra Construction Ltd. H-146, Shaheb Bazar, Ghoramara; Boalia PS; Rajshahi-6100; Bangladesh
|
440.51
|
|
|
|
0
|
|
|
07/10/2024
|
|
2
|
BDIRWSP/BAR/AMT/DW-04
|
Widening & Strengthening of Amtali (AK High school) RHD- Gazipur GC via Talukder hat road at Ch. 3200-3900m & Ch. 6000-7700m and 275.00m RCC Road on Talukder Bazar (Ch. 7000-7275m) under Amtali Upazila, District-Barguna. Road ID No: 504092001. Salvage Materials Cost Tk. 560448.00
|
BDIRWSP
|
amtali
|
504092001
|
2.40
|
|
|
486.60
|
Barendra Construction Ltd. H-146, Shaheb Bazar, Ghoramara; Boalia PS; Rajshahi-6100; Bangladesh
|
437.94
|
|
|
|
0
|
|
|
07/10/2024
|
|
3
|
BDIRWSP/BAR/AMT/DW-05
|
Widening & Strengthening of Amtali (AK High school) RHD- Gazipur GC via Talukder hat road at Ch. 7700-10200m under Amtali Upazila, District-Barguna. Road ID No: 504092001. Salvage Materials Cost Tk. 899836.00
|
BDIRWSP
|
amtali
|
504092001
|
2.50
|
|
|
466.04
|
Barendra Construction Ltd. H-146, Shaheb Bazar, Ghoramara; Boalia PS; Rajshahi-6100; Bangladesh
|
419.44
|
|
|
|
0
|
|
|
07/10/2024
|
|
4
|
BDIRWSP/BAR/AMT/DW-06
|
Widening & Strengthening of Amtali (AK High school) RHD- Gazipur GC via Talukder hat road at Ch. 10200-12350m under Amtali Upazila, District-Barguna. Road ID No: 504092001. Salvage Materials Cost Tk. 818888.00
|
BDIRWSP
|
amtali
|
504092001
|
2.15
|
|
|
398.03
|
Barendra Construction Ltd. H-146, Shaheb Bazar, Ghoramara; Boalia PS; Rajshahi-6100; Bangladesh
|
358.22
|
|
|
|
0
|
|
|
07/10/2024
|
|
5
|
BDIRWSP/BAR/BAM/DW-17
|
Widening & Strengthening of Bamna H/Q- Bukabunia UP-Dawatala GC road at Ch. 7000-12650m and 166.00m RCC Road (Ch. 8364-8530m) including 01 No. 1.50mx1.50m RCC Box Culvert at 8426m under Bamna Upazila, District-Barguna. Road ID No: 504192008. Salvage Materials Cost Tk. 1174044.00
|
BDIRWSP
|
bamna
|
504192008
|
5.82
|
|
|
1252.22
|
Barendra Construction Ltd. H-146, Shaheb Bazar, Ghoramara; Boalia PS; Rajshahi-6100; Bangladesh
|
1127.00
|
|
|
|
0
|
|
|
08/10/2024
|
|
6
|
BDIRWSP/BAR/SAD/DW-12
|
Widening & Strengthening of Barguna UZ HQ- Patharghata UZ HQ Via Parirkhal GC Road (Sadar Part) road at Ch. 13000-15000m under Sadar Upazila, District-Barguna. Road ID No: 504282004. Salvage Materials Cost Tk. 463420.00
|
BDIRWSP
|
barguna-s
|
504282004
|
2.00
|
|
|
349.81
|
Barendra Construction Ltd. H-146, Shaheb Bazar, Ghoramara; Boalia PS; Rajshahi-6100; Bangladesh
|
314.83
|
|
|
|
0
|
|
|
08/10/2024
|
|
7
|
BDIRWSP/BAR/BAM/DW-16
|
Widening & Strengthening of Bamna H/Q- Bukabunia UP-Dawatala GC road at Ch. 0.00-7000m and 215.00m RCC Road (Ch. 4600-4815m) including 01 No. 1.50mx1.50m RCC Box Culvert at 6116m and 02 Nos. 2.50mx2.50m RCC Box Culvert at 775m & 2744m 01 No. 4.00mx4.00m RCC Box Culvert at 6005m under Bamna Upazila, District-Barguna. Road ID No: 504192008. Salvage Materials Cost Tk. 1543600.00
|
BDIRWSP
|
barguna-s
|
504192008
|
7.22
|
|
|
1638.64
|
Barendra Construction Ltd. H-146, Shaheb Bazar, Ghoramara; Boalia PS; Rajshahi-6100; Bangladesh
|
1474.78
|
|
|
|
0
|
|
|
08/10/2024
|
|
8
|
BDIRWSP/BAR/SAD/DW-15
|
Widening & Strengthening of Barguna UZ HQ- Patnarghata UZ HQ Via Parirkhal GC Road (Sadar Part) road at Ch.20000-22680mm, under Sadar Upazila, Distnct-Barquna. Road ID No. 504282004, Salvage Materials Cost Tk. 972468.00
|
BDIRWSP
|
barguna-s
|
504282004
|
|
|
|
481.56
|
JAKAULLAH AND BROTHERS LIMITED, Molla Tower, Thana Mour, Jibannagar, Chuadanga
|
433.41
|
|
|
|
0
|
|
|
08/10/2024
|
|
9
|
BDIRWSP/BAR/SAD/DW-07
|
Widening & Strengthening of Barguna UZ HQ- Patharghata UZ HQ Via Parirkhal GC Road (Sadar Part) road at Ch. 0.00-2500m under Sadar Upazila, District-Barguna. Road ID No: 504282004. Salvage Materials Cost Tk. 635657.00
|
BDIRWSP
|
barguna-s
|
504282004
|
2.50
|
|
|
491.85
|
Barendra Construction Ltd. H-146, Shaheb Bazar, Ghoramara; Boalia PS; Rajshahi-6100; Bangladesh
|
442.67
|
|
|
|
0
|
|
|
07/10/2024
|
|
10
|
BDIRWSP/BAR/SAD/DW-08
|
Widening & Strengthening of Barguna UZ HQ- Patharghata UZ HQ Via Parirkhal GC Road (Sadar Part) road at Ch. 2500-5468m including 01 No. 1.00mx1.00m RCC Box Culvert at 5210m and 01 No. 2.00mx2.00m RCC Box Culvert at 2540m under Sadar Upazila, District-Barguna. Road ID No: 504282004. Salvage Materials Cost Tk. 1064204.00
|
BDIRWSP
|
barguna-s
|
504282004
|
2.97
|
|
|
487.87
|
Barendra Construction Ltd. H-146, Shaheb Bazar, Ghoramara; Boalia PS; Rajshahi-6100; Bangladesh
|
439.08
|
|
|
|
0
|
|
|
07/10/2024
|
|
11
|
BDIRWSP/BAR/SAD/DW-09
|
Widening & Strengthening of Barguna UZ HQ- Patharghata UZ HQ Via Parirkhal GC Road (Sadar Part) road at Ch. 5468-8300m under Sadar Upazila, District-Barguna. Road ID No: 504282004. Salvage Materials Cost Tk. 415715.00
|
BDIRWSP
|
barguna-s
|
504282004
|
2.83
|
|
|
495.34
|
Barendra Construction Ltd. H-146, Shaheb Bazar, Ghoramara; Boalia PS; Rajshahi-6100; Bangladesh
|
445.81
|
|
|
|
0
|
|
|
07/10/2024
|
|
12
|
BDIRWSP/BAR/SAD/DW-10
|
Widening & Strengthening of Barguna UZ HQ- Patharghata UZ HQ Via Parirkhal GC Road (Sadar Part) road at Ch. 8300-10900m including 01 No. 1.00mx1.00m RCC Box Culvert at 9759m under Sadar Upazila, District-Barguna. Road ID No: 504282004. Salvage Materials Cost Tk. 566365.00
|
BDIRWSP
|
barguna-s
|
504282004
|
2.60
|
|
|
480.95
|
Barendra Construction Ltd. H-146, Shaheb Bazar, Ghoramara; Boalia PS; Rajshahi-6100; Bangladesh
|
432.86
|
|
|
|
0
|
|
|
07/10/2024
|
|
13
|
BDIRWSP/BAR/SAD/DW-11
|
Widening & Strengthening of Barguna UZ HQ- Patharghata UZ HQ Via Parirkhal GC Road (Sadar Part) road at Ch. 10900-13000m under Sadar Upazila, District-Barguna. Road ID No: 504282004. Salvage Materials Cost Tk. 460583.00
|
BDIRWSP
|
barguna-s
|
504282004
|
2.10
|
|
|
359.25
|
Barendra Construction Ltd. H-146, Shaheb Bazar, Ghoramara; Boalia PS; Rajshahi-6100; Bangladesh
|
323.33
|
|
|
|
0
|
|
|
07/10/2024
|
|
14
|
BDIRWSP/BOR/PAT/DW-01
|
Widening & Strengthening of Patharghata GC (Ghutabacha RHD)-Kalmegha GC (UZR) road at Ch. 0.00-4165m including 03 Nos. 2.00mx2.00m RCC Box Culvert at 517m, 1127m & 2402m and 01 No. 2-vent 4.00mx4.00m RCC Box Culvert at 2825m under Patharghata Upazila, District-Barguna. Road ID No: 504852002. Salvage Materials Cost Tk. 5004691.00
|
BDIRWSP
|
patharghata
|
504852002
|
4.17
|
|
|
803.69
|
M/S Abul Kalam Azad Muslimpara, Patuakhali Sadar, Patuakhali
|
723.32
|
|
|
|
0
|
|
|
07/10/2024
|
|
15
|
BDIRWSP/BOR/PAT/DW-02
|
Widening & Strengthening of Patherghata HQ-Harinbaria Badurtala Bazar (UNR) road at Ch. 0.00-4615m including 01 No. 2-vent 4.00mx4.00m RCC Box Culvert at 1636m under Patharghata Upazila, District-Barguna. Road ID No: 504853001. Salvage Materials Cost Tk. 945868.00
|
BDIRWSP
|
patharghata
|
504853001
|
4.62
|
|
|
747.43
|
M/S Abul Kalam Azad Muslimpara, Patuakhali Sadar, Patuakhali
|
672.69
|
|
|
|
0
|
|
|
07/10/2024
|
|
16
|
BDIRWSP/BAR/TAL/DW-18
|
Widening & Strengthening of Taltali GC- Bogir hat GC via Taltali Digree College road at Ch. 0.00-9700m under Taltali Upazila, District-Barguna. Road ID No: 504872004. Salvage Materials Cost Tk. 2122400.00
|
BDIRWSP
|
Taltali
|
504872004
|
9.70
|
|
|
1615.49
|
Barendra Construction Ltd. H-146, Shaheb Bazar, Ghoramara; Boalia PS; Rajshahi-6100; Bangladesh
|
1453.94
|
|
|
|
0
|
|
|
08/10/2024
|
|
17
|
BDRIDP/BRG/AMT/CCA-Rd/01 (Tender ID 72101)
|
Improvement of road by BC from Angulkata GPS cum cyclone shelter-North Angulkata GPS & Lunch ghat via Khekuani Bazar Road at ch 1900m-4200m.Effective length 2270m and construction of 1 No0.925mx1.20m U-Drain(L=8m) at ch 3250m.
|
BDRIDP
|
amtali
|
|
2.30
|
|
|
131.06
|
M/S Mithun Traders
|
109.43
|
|
01/01/2017
|
06/11/2017
|
0
|
|
|
|
|
18
|
BDRIDP/BRG/PAT/CCA-Rd/04(ID-146855)
|
Improvement of Amratala GPS Cum Cyclone Shelter Connecting road Kelmegha UP-Mesherpur Bazar via Paschim Amratala GPS road. DPP ID No-504855062 New ID No-504853020 a) Earthwork Ch. 00-1000m. b) Bituminous Carpeting Ch. 00-1000m. c) U-Drain at Ch. 112.00m,
|
BDRIDP
|
amtali
|
|
1.00
|
|
|
69.86
|
M/S KK Enterprise
|
68.92
|
|
25/02/2018
|
10/07/2018
|
0
|
|
|
|
|
19
|
BDRIDP/BRG/ AMT/CCA-Rd/02(ID-162870)
|
Improvement of road Khaliyan Bus-Stand to H/O Hasem Mridha via Valoybunia GPS & Nilgonj High School Road by BC From Ch. 00m to 1450m Including structure under Amtali Upazila, District: Barguna [Road ID-504094087]
|
BDRIDP
|
amtali
|
|
1.45
|
|
|
91.65
|
Md. Abul Kalm Azad
|
89.63
|
|
30/10/2018
|
|
0
|
|
|
|
|
20
|
BDRIDP/BRG/AMT/UZ-St/01
|
Construction of 21.00n RCC Girder Bridge on Amtali Mohiskata R&H - Kalagasia Kaserhat GC via Gulishakhali Bazar at ch 3790m under Amtali Upazila.Barguna.
|
BDRIDP
|
amtali
|
|
|
|
|
155.45
|
Md.Enayet Hossain
|
147.64
|
|
14/05/2018
|
14/01/2019
|
0
|
|
|
|
|
21
|
BDRIDP/BRG/BET/UZ-Ew/03
|
Resectioning of road from Niamati - Deshanterkathi via DC Hat Ch. 3900-5363m
|
BDRIDP
|
amtali
|
|
1.46
|
|
|
4.94
|
LCS Hemayet
|
4.94
|
|
09/06/2015
|
30/08/2015
|
0
|
|
|
|
|
22
|
BDRIDP/BRG/AMT/CCA-Ew/01
|
Improvement of road from Bamna Bukabunia road to gafur Master House at WAPDA road from ch 0.00-600.00m
|
BDRIDP
|
amtali
|
|
0.60
|
|
|
1.81
|
Mrs Beauty Begum
|
1.81
|
|
20/06/2016
|
20/06/2016
|
0
|
|
|
|
|
23
|
BDRIDP/BRG/AMT/CCA-Ew/02
|
Improvement of road by Earth workfrom Amtali-Moshiskata RHD-Kalagasia Khasher Hat GC via Gulishakhali Bazar at ch 7500m-7900m under Amtali,Barguna.
|
BDRIDP
|
amtali
|
|
0.40
|
|
|
3.70
|
Md.Shahidul Islam
|
0.00
|
|
01/09/2016
|
30/03/2017
|
0
|
|
|
|
|
24
|
BDRIDP/BRG/AMT/CCA-Ew/03
|
Improvement of road by Earth workfrom Amtali-Moshiskata RHD-Kalagasia Khasher Hat GC via Gulishakhali Bazar at ch 7900m-8400m under Amtali,Barguna.
|
BDRIDP
|
amtali
|
|
0.50
|
|
|
3.14
|
Md Shohel Musulli
|
0.00
|
|
01/09/2016
|
30/03/2017
|
0
|
|
|
|
|
25
|
BDRIDP/BRG/AMT/CCA-Ew/04
|
Improvement of road by Earth workfrom Amtali-Moshiskata RHD-Kalagasia Khasher Hat GC via Gulishakhali Bazar at ch 8400m-8843m under Amtali,Barguna.
|
BDRIDP
|
amtali
|
|
0.44
|
|
|
3.23
|
Md.Shahin Gazi
|
3.23
|
|
01/09/2016
|
30/03/2017
|
0
|
|
|
|
|
26
|
BDRIDP/BRG/SDR/UZ-Ew/01(Group-2)
|
Improvement of road from Barguna - Lakurtala -Dhupati - Chandukhali GC at ch 9350m-10025m
|
BDRIDP
|
amtali
|
|
0.68
|
|
|
4.16
|
Abdus salam
|
4.16
|
|
30/06/2017
|
|
0
|
|
|
|
|
27
|
BDRIDP/BRG/AMT/UZ-EW/01
|
Resectioning of road from Gazipur GC-Badura GC via Atharogasia UP Ch.3600m-4220m
|
BDRIDP
|
amtali
|
|
0.62
|
|
|
4.98
|
Md.Shahajahan Fakir
|
4.98
|
|
21/11/2017
|
21/05/2018
|
0
|
|
|
|
|
28
|
BDRIDP/BRG/AMT/UZ-EW/02
|
Resectioning of road from Gazipur GC-Badura GC via Atharogasia UP Ch.4200m-4850m
|
BDRIDP
|
amtali
|
|
0.65
|
|
|
4.76
|
Md.Rubel chawkider
|
4.76
|
|
21/11/2017
|
21/05/2018
|
0
|
|
|
|
|
29
|
BDRIDP/BRG/AMT/UZ-EW/03
|
Resectioning of road from Gazipur GC-Badura GC via Atharogasia UP Ch.5860m-6285m
|
BDRIDP
|
amtali
|
|
0.43
|
|
|
4.52
|
Md.Shahajahan
|
4.52
|
|
28/01/2018
|
30/04/2018
|
0
|
|
|
|
|
30
|
BDRIDP/BRG/BAM/CCA-St/01
|
Construction of 1 No 1.50m*1.50m RCC Box culvert on Madha Kakchira GPS cum Cyclone Shelter- Cotto Bhaijora GPS- Khuchnichora GPS cum Cyclone Shelter road at Ch. 1350m (Road ID-504194011) Upazila: Bamna , District: Barguna.
|
BDRIDP
|
bamna
|
|
|
|
|
4.14
|
M/S Homaira construction
|
3.35
|
|
01/06/2015
|
30/09/2016
|
0
|
|
|
|
|
31
|
BDRIDP/BRG/BAM/UN-Rd(R)/01
|
Rehabilitation of road from Bukabunia Head Quarter- Amua GC via Laxmipura Madrasha road by BC from Ch. 1000-3000m with 1.50m*1.50m Box Culvert at Ch. 1400m (Road ID-504193004) Upazila: Bamna , District: Barguna.
|
BDRIDP
|
bamna
|
|
|
|
|
102.01
|
M/S Ahmed Still Industries
|
85.70
|
|
31/05/2015
|
30/06/2016
|
0
|
|
|
|
|
32
|
BDRIDP/BRG/BAM/CCA-Rd/02(Tender ID-23932)
|
Improvement of road from Bamna Bukabunia road to gafur Master House with 2Nos U-Drain at ch 10m & 300m.
|
BDRIDP
|
bamna
|
|
|
|
|
34.18
|
M/S Rudra Enterprise
|
28.36
|
|
18/04/2016
|
18/10/2016
|
0
|
|
|
|
|
33
|
BDRIDP/BRG/BAM/CCA-RdR/01 (Tender ID 103724)
|
Rehabilitation of road from Maidha Kakchira GPS cum Cyclone Shelter- Cotto Bhaijora GPS- Khuchnichora GPS cum Cyclone Shelter road from Ch. 930-2100m (Road ID-504194011 Salvage amount Tk 688913.00) Upazila: Bamna , District: Barguna.
|
BDRIDP
|
bamna
|
|
1.17
|
|
|
63.02
|
M/S Poly construction
|
56.72
|
|
01/09/2017
|
28/02/2018
|
0
|
|
|
|
|
34
|
BDRIDP/BRG/BAM/CCA-Rd/03
|
Improvement of Road from Tulatala BC road to Bebazia khal GPS cum Cyclone Shelter via Dhalu Sikder House from Ch. 00-500m under Bamna Upazila District Barguna Road ID-504194051 Salvage amount Tk. 27776
|
BDRIDP
|
bamna
|
|
0.50
|
|
|
25.23
|
M/S Kohinoor Enterprise
|
22.70
|
|
27/09/2017
|
27/03/2018
|
0
|
|
|
|
|
35
|
BDRIDP/BRG/BAM/CCA-Rd/04
|
Improvement of road from Ramna dawatala battala Culvert- Wapda via Poschim Golaghata GPS Cum Cyclone Shelter at ch 0.00-715m and Construction of 05Nos U-Drain on same road at ch 40m,250m450m,593m & 682m under Bamna Barguna
|
BDRIDP
|
bamna
|
|
0.72
|
|
|
51.85
|
M/S Atom Enterprise
|
49.26
|
|
07/03/2018
|
07/09/2018
|
0
|
|
|
|
|
36
|
BDRIDP/BRG/ BAM/UN-Rd/02(ID-162871)
|
Improvement of Bamna UP Office-Gudhighata Bazar via Kuchnichora GPS Ramna UP Office-Gudhighata Bazar via Kuchinichora GPS Road by BC From Ch. 1370m to 2370m Earthen from CH. 1000m to 2000m & 1 Nos U-Drain at Ch. 1940m under Bamna Upazila, District: Bargun
|
BDRIDP
|
bamna
|
|
1.00
|
|
|
59.86
|
M/S Khankaker Sahin Ahmed.Paschim Goalchatmot. Faridpur
|
53.87
|
|
14/05/2018
|
14/11/2018
|
0
|
|
|
|
|
37
|
BDRIDP/BRG/BAM/CCA-Rd/05(ID-162872)
|
Improvement of Uttar Kakchira Bazar Chalavanga Launch Ghat via Gudhighata Adarsha GPS cum Cyclone Shelter Road by BC From Ch. 00m to 1000m under Bamna Upazila, District: Barguna [Road ID-504194080]
|
BDRIDP
|
bamna
|
|
0.00
|
|
|
59.19
|
M/S Khankaker Sahin Ahmed.Paschim Goalchatmot. Faridpur
|
53.27
|
|
14/05/2018
|
14/11/2018
|
0
|
|
|
|
|
38
|
BDRIDP/BRG/ BAM/UN-Rd/03(ID-162873)
|
Improvement of Dawatala UP Office-Uttar Kakchira Bazar via Nobogram GPS Road by BC From Ch. 00m to 1000m under Bamna Upazila, District: Barguna [Road ID-504193012] (Salvage amount Tk 426251.00).
|
BDRIDP
|
bamna
|
|
1.00
|
|
|
73.79
|
M/S Khankaker Sahin Ahmed.Paschim Goalchatmot. Faridpur
|
66.41
|
|
21/05/2018
|
21/11/2018
|
0
|
|
|
|
|
39
|
BDRIDP/BRG/ BAM/GHT/01
|
Construction of Gfhat at Bukabunia Bazar
|
BDRIDP
|
bamna
|
|
|
|
|
30.30
|
M/S Arif & Asif Construction. Sadar road Barguna.
|
30.19
|
|
27/05/2018
|
27/09/2018
|
0
|
|
|
|
|
40
|
BDRIDP/BRG/BAM/CCA-Rd/06
|
Improvement of road Chalitabunia Bazar Bukabunia UP Dr. Lublu House.ID No-504194004 (a) Earth wark from Ch. 1739m-3174m. (b) Carpeting BC from Ch. 1739m-3174m. (c) Construction of 1 Nos 4.00mx3.00m & 1 Nos 1.5mX1.5m Box Culvert at Ch. 2616m & 2424m. 2 Nos
|
BDRIDP
|
bamna
|
|
1.44
|
|
|
123.35
|
M/S Akon Trading Hospital Road ,Bamna, Barguna
|
117.18
|
|
13/08/2018
|
13/02/2019
|
0
|
|
|
|
|
41
|
BDRIDP/BRG/BAM/CCA-Ew/01
|
Re-section of road from Bamna Bukabunia road-Gafur Master Hiouse at RAPDA road by Earthen at ch 00.00-600.00m under Bamna,Barguna
|
BDRIDP
|
bamna
|
|
0.60
|
|
|
1.81
|
LCS Mrs. Bauety Begum
|
1.81
|
|
03/06/2016
|
20/06/2016
|
0
|
|
|
|
|
42
|
BDRIDP/ PAT/SAD/ CCA-Rd/01
|
Imp. Of road from Moukaran UNR road start Purbo Talikhali Mazibar dokan-North side Kafulabunia khal-Daritaluk P/S & H/S road via Abdul Latif Howlader bari road by HBB from ch.00-1500m.
|
BDRIDP
|
bamna
|
|
1.50
|
|
|
35.00
|
Md. Shafiqur Rahman
|
30.80
|
|
|
|
0
|
|
|
|
|
43
|
BDRIDP/ PAT/SDR/ CCA-RD/02
|
Improvement of road from Pangashia UP-Gazipur R&H (Bus Stand)-Jamla road upto Sreerampur Sluice Gate road by BC from ch.4228-5724m
|
BDRIDP
|
bamna
|
|
1.50
|
|
|
76.41
|
M/S. Selim Stores
|
71.83
|
|
|
|
0
|
|
|
|
|
44
|
BDRIDP/ PAT/SAD/ CCA-Rd/03
|
Imp. Of road from Low Kathi Officer hat to Kaler hat via Kismat Moukarn Primary School road by BC from ch.1400-3116m
|
BDRIDP
|
bamna
|
|
1.72
|
|
|
79.96
|
Md. Jasim Uddin Khan
|
71.84
|
|
|
|
0
|
|
|
|
|
45
|
BDRIDP/ PAT/SAD/ CCA-Rd/04
|
Imp. Of road from Moukaran UZR road via Jabber Sikder bari via Fakir Bari-Rashid Kazi Bari via Muktijodda Yousuf Kazi bari-Moukarn Bazar Gazipur road by HBB from ch.00-1215m
|
BDRIDP
|
bamna
|
|
1.22
|
|
|
34.64
|
M/S. Hima Bricks
|
29.81
|
|
|
|
0
|
|
|
|
|
46
|
BDRIDP/PAT/SAD/CCA-Rd/07
|
Improvement of road from Showla Baily Bridge-Full Sharif Bazar via Mazi Bari-pachim Vaila Madrasha-Vaila RNGPS road By HBB from Ch.3000-4200m with 1 No U-Drain (625mmx625mm) at Ch.4200m (ID No. 578954111)
|
BDRIDP
|
bamna
|
|
1.20
|
|
|
40.09
|
M/S. Hima Bricks
|
39.97
|
|
|
|
0
|
|
|
|
|
47
|
BDRIDP/PAT/SAD/CCA-Rd/05
|
Improvement of road from Jainkati UP-Bhuria Bazar UNR to Pathan Bari Mosque via Abdul Malek Mredha Bari by HBB form ch. 00-550m (ID No. 578955341)
|
BDRIDP
|
bamna
|
|
0.55
|
|
|
11.06
|
M/S. Hima Bricks
|
10.12
|
|
|
|
0
|
|
|
|
|
48
|
BDRIDP/PAT/SAD/CCA-Rd/06
|
Improvement of road from Islampur Madrasha to BWDB Embankment via Rafiqul Islam Moulana Bari by HBB form ch. 00-600m (ID No. 578955342)
|
BDRIDP
|
bamna
|
|
0.60
|
|
|
14.75
|
M/S. Hima Bricks
|
12.69
|
|
|
|
0
|
|
|
|
|
49
|
BDRIDP/ PAT/SAD/ UN-Rd/01
|
Imp. Of road from Badarpur UP-Lowkati UP via Skandar Rari Bari road by HBB from ch.4955-5990m with 1No U-Drain at ch.5779m
|
BDRIDP
|
bamna
|
|
1.04
|
|
|
32.00
|
M/S. Hima Bricks
|
27.62
|
|
|
|
0
|
|
|
|
|
50
|
BDRIDP/ PAT/SAD/ UZR-Rd/01
|
Imp. Of road Patuakhali-Brisal R&H to Dumki Upazila via Moukaran GC (Sadar part) road by BC from ch.3255-5035m
|
BDRIDP
|
bamna
|
|
1.78
|
|
|
126.67
|
M/S. Nazmul Shahdat Traders
|
110.77
|
|
|
|
0
|
|
|
|
|
51
|
BDRIDP/ PAT/SDR/ UN-Rd/02
|
Improvement of road from Auliapur UP-Badura GC via Dhakkin Badura GPS (Dhakkin Badura GPS cum Cyclone Center) road (ID No. 578953035) by BC from Ch. 3500m-4500m under Patuakhali Sadar, Patuakhali.
|
BDRIDP
|
bamna
|
|
1.00
|
|
|
114.23
|
M/S. Lutfa Construction
|
93.02
|
|
|
|
0
|
|
|
|
|
52
|
BDRIDP/ PAT/SAD/ UZ-Rd/02
|
Improvement of road from Khaser hat GC to Bottolbunia GC via Hazikhali Bazar road by Earth work (Ch. 3805-4805m)
|
BDRIDP
|
bamna
|
|
1.00
|
|
|
66.53
|
M/S. Mohiuddin Ahmed
|
58.80
|
|
|
|
0
|
|
|
|
|
53
|
BDRIDP/PAT/SAD/UZ-Rd/03
|
Improvement of road from Patuakhali Barisal R&H (Moukaran Bridge)-Dumki UZHQ via Moukaran GC Road (Sadar Part) from Ch. 5035m-6965m (Road ID No. 578952007)
|
BDRIDP
|
bamna
|
|
1.93
|
|
|
131.69
|
M/S. Shakil Enterprise
|
104.92
|
|
|
|
0
|
|
|
|
|
54
|
BDRIDP/PAT/SDR/UZ-Rd/04
|
Improvement of Road from Patuakhali-Betagi R&H Pairakunja Bazar Kakrabunia GC via Officer hat Sadar Part from Ch. 3200m-5200m including 3 Nos 1.50mx1.50m RCC Box Culvert at Ch. 3615m 3700m & 4840m ID No. 578952011
|
BDRIDP
|
bamna
|
|
2.00
|
|
|
155.83
|
M/S. Nazmus Shahdat Traders
|
154.36
|
|
|
|
0
|
|
|
|
|
55
|
BDRIDP/PAT/SDR/CCA-Rd/08
|
Improvement of road From Khejurtala Bazar-Dhankhali Bazar via Dakurbunia GPS at Ch. 0.00-1000.00m including 2Nos. 1.50mX1.50m RCC Box Culvert at Ch. 220.00m & 415.00m (ID No. 578954096)
|
BDRIDP
|
bamna
|
|
1.00
|
|
|
68.65
|
Md. Gius Uddin
|
61.79
|
|
|
|
0
|
|
|
|
|
56
|
BDRIDP/PAT/SDR/CCA-Rd/09
|
Improvement of road From Sreerapur Bazar-Munshir hat via Parkartikpasha GPS at ch. 765.00m-2300.00m including 1No. 1.50mX1.50m RCC Box Culvert at Ch. 1250.00m (ID No. 578954052)
|
BDRIDP
|
bamna
|
|
1.54
|
|
|
96.81
|
Md. Firoz
|
91.01
|
|
|
|
0
|
|
|
|
|
57
|
BDRIDP/PAT/SDR/CCA-Rd/10
|
Improvement of road From (UZR) Fadea Bazar-(UNR) Gadur Bazar ch. 0.00-1300.00m including 1No. 1.50mX1.50m RCC Box Culvert at Ch. 1000.00m (ID No. 578954156)
|
BDRIDP
|
bamna
|
|
1.30
|
|
|
85.19
|
M/S. Soma Enterprise
|
77.47
|
|
|
|
0
|
|
|
|
|
58
|
BDRIDP/PAT/SAD/UZ-Rd/05
|
Improvement of BC road From Khasher Hat GC - Bottlebunia GC via Hazikhali Hat at Ch. 2450m-3805m including 01 No. 1.00mx1.00m RCC Box Culvert at ch. 3053m. (ID No. 578952006)
|
BDRIDP
|
bamna
|
|
1.36
|
|
|
109.33
|
Abdul Kader Khan
|
103.77
|
|
|
|
0
|
|
|
|
|
59
|
BDRIDP/PAT/SAD/CCA-Rd/11
|
Improvement of BC road From UZR (Hazikhali Mohammadia Madrasha) to UNR (Atahar Pada bari) - Iron Bridge road at Ch. 00m-1830m including 02 Nos. 1.50mx1.50m RCC Box Culvert at ch. 510m & 1380m. (ID No. 578954168)
|
BDRIDP
|
bamna
|
|
1.83
|
|
|
116.16
|
Md. Bashir Uddin
|
116.06
|
|
|
|
0
|
|
|
|
|
60
|
BDRIDP/PAT/SAD/UZ-Rd/06
|
Improvement of Patuakhali UZHQ-Muradia GC via Sreerampur Bazar (Sadar Part) at Ch. 6785m-8785m. Including 04 Nos 1.50mX1.50m, 01 No. 3.00mX3.00m (2-vent) RCC Box Culvert at Ch. 6945m, 7565m 7835m, 8495m & 7357m
|
BDRIDP
|
bamna
|
|
2.00
|
|
|
159.35
|
Md. Manebur Rahman
|
154.45
|
|
|
|
0
|
|
|
|
|
61
|
BDRIDP/ PAT/SAD/ UZR-ST/01
|
Const.of 1No 4.00mx4.00m RCC Box Culvert on Patuakhali-Barisal R&H to Dumki Upazila via Moukaran GC (Sadar part) road at ch.4715m.
|
BDRIDP
|
bamna
|
|
|
|
|
22.31
|
M/S. Gazi Enterprise
|
17.52
|
|
|
|
0
|
|
|
|
|
62
|
BDRIDP/ PAT/SAD/ CCA-ST/01
|
Const. of 3.00mx3.00m RCC Box culvert on Moukarn UNR road start Purbo Talikhali Mazibar dokan-North side Kafulabunia khal-daritaluk P/S & H/S road via Abdul Latif Howlader bari road at ch.1140m
|
BDRIDP
|
bamna
|
|
|
|
|
10.62
|
M/S. Masud & Brothers
|
7.78
|
|
|
|
0
|
|
|
|
|
63
|
BDRIDP/ PAT/SDR/ CCA-St/02
|
Const. of 1 No. 3.00mX1.00m Box culvert on Pangasha UP-Gazipur R&H (Bus Stand)-Jamla road upto Sreerampur Sluice Gate road at ch.4380m.
|
BDRIDP
|
bamna
|
|
|
|
|
9.79
|
M/S. Gazi Enterprise
|
7.29
|
|
|
|
0
|
|
|
|
|
64
|
BDRIDP/ PAT/SAD/ CCA-St/03
|
Const. of 1 No 3.00mx3.00m Box Culvert & 03 Nos U-Drain on Low Kathi Officer hat to Kaler hat via Kismat Moukaran Primary School road at ch.2630m, 1792m,2309m & 2976m.
|
BDRIDP
|
bamna
|
|
|
|
|
12.69
|
M/S. Gazi Enterprise
|
9.83
|
|
|
|
0
|
|
|
|
|
65
|
BDRIDP/ PAT/SDR/ UN-St/01
|
Construction of 02 Nos. 3.00mx3.00m RCC Box Culvert on Auliapur UP-Badura GC via Dhakkin Badura GPS (Dhakkin Badura GPS cum Cyclone Center) road at Ch. 3600m & 4150m (ID No. 578953035) under Patuakhali Sadar, Patuakhali.
|
BDRIDP
|
bamna
|
|
|
|
|
28.39
|
M/S. Soma Enterprise
|
19.42
|
|
|
|
0
|
|
|
|
|
66
|
BDRIDP/PAT/SAD/UZ-St/02
|
Construction of 2Nos 1.00mX1.00m RCC Box Culvert on Khaser Hat GC via Hazikhali Bazar road at Ch. 4285m & 4450m (ID No. 578952006)
|
BDRIDP
|
bamna
|
|
|
|
|
0.00
|
M/S. Talukder Enterprise
|
4.37
|
|
|
|
0
|
|
|
|
|
67
|
BDRIDP/PAT/SAD/UZ/St-03
|
Construction of 2 Nos. 3.00mx3.00m, 2 Nos. 2.00mx2.00m & 2 Nos. 1.50mx1.50m RCC Box Culvert on Patuakhali Barisal R&H (Moukaran Bridge)-Dumki UZHQ via Moukaran GC Road (Sadar Part) at Ch. 5865m, 6135m, 6592m, 6435m, 5185m & 5499m. (Road ID No. 578952007)
|
BDRIDP
|
bamna
|
|
|
|
|
52.98
|
Md. Gius Uddin
|
35.96
|
|
|
|
0
|
|
|
|
|
68
|
BDRIDP/PAT/SAD/CCA-St/04
|
Construction of 2-Vent 3.00mx3.00m RCC Box Culvert on Auliapur UP-Badura GC via Dakkhin Badura GPS at Ch. 6500m (Auliapur UP-H/O Bonda Ali Miah South Badura Bazar)
|
BDRIDP
|
bamna
|
|
|
|
|
19.38
|
Md. Mahafuz Khan
|
17.44
|
|
|
|
0
|
|
|
|
|
69
|
BDRIDP/PAT/SAD/UZ-St/04
|
Construction of 42.06m RCC Girder Bridge on Patuakhali Barisal RHD (Moukaron Bridge)-Dumki UZHQ via Moukaran GC (Sadar Part) at Ch. 3282m (Road ID: 578952007)
|
BDRIDP
|
bamna
|
|
|
|
|
268.58
|
M/S. Amir Engineering Corporation-M.M. Builders & Engineers Ltd.-M/S. Niaz Traders-JV
|
241.72
|
|
|
|
0
|
|
|
|
|
70
|
BDRIDP/BRG/SDR/UZ-St/01
|
Construction of 72.00n Long RCC Girder Bridge on Barguna - Fuljhuri GC- Kakchira GC road Adjacent to Barguna Fish Market at ch 50.00m under Barguna Sadar Upazila.Barguna.
|
BDRIDP
|
barguna-s
|
|
|
|
|
359.91
|
MSE-SMS(JV)
|
403.93
|
|
08/09/2016
|
30/01/2018
|
95
|
|
|
|
|
71
|
BDRIDP/BRG/SAD/CCA-Rd/01 (Tender ID 72101)
|
Improvement of road from Barguna - Lakurtala -Dhupati - Chandukhali GC at ch 8400m-10025m with construction of 2 Nos small structure U-Drain(625mmx900mm) at ch 8625m & 9350m
|
BDRIDP
|
barguna-s
|
|
1.63
|
|
|
114.89
|
M/S Sonali Enterprise
|
101.21
|
|
07/02/2017
|
07/02/2018
|
100
|
|
|
|
|
72
|
BDRIDP/BRG/SAD/CCA-Rd/01 (188387)
|
Improvement of Kumarkhali GPS Connecting Approach Road Bawalker GCCR- Kumarkhali Jame Mosque Road at Ch. 00.00m to 1000.00m under Barguna Sadar Upazila District Barguna Road ID- 504285029 Salvage amount Tk. 605472.00
|
BDRIDP
|
barguna-s
|
|
1.00
|
|
|
63.49
|
M/S RS Buisness Center
|
60.32
|
|
13/07/2018
|
13/01/2019
|
50
|
|
|
|
|
73
|
BDRIDP/BRG/SDR/UZ-St/04 (190364)
|
Construction of 15.00m Long RCC Girder Bridge on Katherpul RHD-Kadamtala Hat-Baikalin Hat-Ayla GC road at Ch. 4364.00m Road ID- 504282010 under Barguna Sadar Upazila Barguna District.
|
BDRIDP
|
barguna-s
|
|
|
|
|
137.80
|
M/S RS Buisness Center
|
130.91
|
|
13/07/2018
|
13/01/2019
|
30
|
|
|
|
|
74
|
BDRIDP/BRG/SDR/UZ-St/02(190361)
|
Construction of 36.00m Long RCC Girder Bridge on Katherpul RHD-Kadamtala Hat-Baikalin Hat-Ayla GC road at Ch. 6455.00m Road ID -504282010 under Barguna Sadar Upazila Barguna District.
|
BDRIDP
|
barguna-s
|
|
|
|
|
218.00
|
M/S Khan Enterprise & M/S Poly Construction
|
209.07
|
|
13/08/2018
|
13/04/2019
|
0
|
|
|
|
|
75
|
BDRIDP/BRG/SDR/UZ-St/03(190362)
|
Construction of 20.00m Long RCC Girder Bridge on Barguna-Lakurtala-Dhapati-Chandukhali GC Road Amtali-Kakchira RHDLakurtala-Chandukhali GC via Andarmanik Road Sadar Part at Ch. 11580.00m Road ID -504282007 under Barguna Sadar Upazila Barguna District.
|
BDRIDP
|
barguna-s
|
|
|
|
|
230.59
|
Quashem Construction & M/S polly Store(JV).Town Kalikapur, patuakhali
|
220.98
|
|
19/08/2018
|
19/08/2019
|
5
|
|
|
|
|
76
|
BDRIDP/BRG/SAD/CCA-St/05
|
Construction of 29.00m PSC Girder Bridge on Katherpol RHD - Kadamtala Hat - Baikalin Hat - Ayla GC road at ch 3215m under Barguna sadar,Barguna. Road ID- 504282010
|
BDRIDP
|
barguna-s
|
|
|
|
|
0.00
|
|
0.00
|
|
|
|
0
|
|
|
|
|
77
|
BDRIDP/BRG/SAD/UZ-St/06 (234465)
|
Construction of Retaining wall & Under pass way of 72.00n Long RCC Girder Bridge Approach on Barguna - Fuljhuri GC- Kakchira GC road Adjacent to Barguna Fish Market at ch 50m ID No-504282003 (a) retaining wall 84.00m (b)guide wall 8.40m (c 2Nos Culvert
|
BDRIDP
|
barguna-s
|
|
|
|
|
75.95
|
M/S RS Buisness Center
|
72.15
|
|
|
|
0
|
|
|
|
|
78
|
BDRIDP/BRG/SAD/CCA-Rd/02, (253161)
|
Improvement of Nazimuddin Bari-Kasem Musuli Bari road. ID No-504285074 a Earth wark from Ch. 00 - 1000m. 9b Carpeting DC from at Ch. 00 - 1000m. c Construction of 3 Nos U - Drain at Ch. 400m 580m 800m.
|
BDRIDP
|
barguna-s
|
|
|
|
|
73.80
|
|
0.00
|
|
|
|
0
|
|
|
|
|
79
|
BDRIDP/BRG/SAD/CCA-Rd/03, (253162)
|
Improvement of Monosatoli Sluice - Latakata road. ID No-504285078 a Earth wark at Ch. 00 - 1000m. b Carpeting DC from at Ch. 00 - 1000m. c Construction of 2 Nos U - Drain at Ch. 540m 700m.
|
BDRIDP
|
barguna-s
|
|
1.00
|
|
|
72.86
|
|
0.00
|
|
|
|
0
|
|
|
|
|
80
|
BDRIDP/BRG/SDR/UZ-Ew/01(Group-1)
|
Improvement of road from Barguna - Lakurtala -Dhupati - Chandukhali GC at ch 8400m-9350m
|
BDRIDP
|
barguna-s
|
|
0.95
|
|
|
4.84
|
Md.Chunnu Miah
|
4.84
|
|
30/06/2017
|
|
100
|
|
|
|
|
81
|
BDRIDP/BRG/BET/UZ-Rd/01
|
Badnikhali GC- Kazirhat GC via west karuna High school road by BC from ch 0.00m-2500.00m under Betagi.
|
BDRIDP
|
barguna-s
|
|
2.50
|
|
|
157.76
|
M/S Khan Enterprise
|
137.12
|
|
07/02/2015
|
06/02/2016
|
100
|
|
|
|
|
82
|
BDRIDP/BRG/BET/UZ-Rd/02
|
Badnikhali GC- Kazirhat GC via west karuna High school road by BC from ch 2500.00m-3700.00m under Betagi.
|
BDRIDP
|
barguna-s
|
|
1.20
|
|
|
73.73
|
M/S Khan Enterprise
|
63.39
|
|
07/02/2015
|
18/04/2016
|
100
|
|
|
|
|
83
|
BDRIDP/BRG/BET/UZ-St/01
|
Construction of 2Nos 4.00m*3.30m 2Vent Box culvert on Badnikhali GC- Kazirhat GC via west karuna High school road by BC at ch 2621.00m & 2891.00m under Betagi.
|
BDRIDP
|
barguna-s
|
|
|
|
|
35.29
|
M/S Safi Enterprise
|
29.46
|
|
01/02/2015
|
01/02/2016
|
100
|
|
|
|
|
84
|
BDRIDP/BRG/PAT/UN-Rd/01
|
Rehabilitation of road from Lemua GC - C&B Bazar(RHD) via Hatempur road by BC from ch 2230.00m-4230.00m(ID NO-504853008)
|
BDRIDP
|
barguna-s
|
|
2.00
|
|
|
105.04
|
Md.Nizam Uddin
|
104.96
|
|
26/04/2015
|
31/12/2016
|
100
|
|
|
|
|
85
|
BDRIDP/BRG/BAM/CCA-St/01
|
Construction of 1 No 1.50m*1.50m RCC Box culvert on Madha Kakchira GPS cum Cyclone Shelter- Cotto Bhaijora GPS- Khuchnichora GPS cum Cyclone Shelter road at Ch. 1350m (Road ID-504194011) Upazila: Bamna , District: Barguna.
|
BDRIDP
|
barguna-s
|
|
|
|
|
4.14
|
M/S Homaira construction
|
3.35
|
|
01/06/2015
|
30/09/2016
|
100
|
|
|
|
|
86
|
BDRIDP/BRG/BAM/UN-Rd(R)/01
|
Rehabilitation of road from Bukabunia Head Quarter- Amua GC via Laxmipura Madrasha road by BC from Ch. 1000-3000m with 1.50m*1.50m Box Culvert at Ch. 1400m (Road ID-504193004) Upazila: Bamna , District: Barguna.
|
BDRIDP
|
barguna-s
|
|
|
|
|
102.01
|
M/S Ahmed Still Industries
|
85.70
|
|
31/05/2015
|
30/06/2016
|
100
|
|
|
|
|
87
|
BDRIDP/BRG/BET/UZ-Rd(R)/03 (Tender ID 25642)
|
Rehabilitation of road from Niamati- Deshanterkathi via DC Hat by BC Ch. 3900-5363.00 (Road ID-504472002) Upazila: Betagi , District: Barguna.
|
BDRIDP
|
barguna-s
|
|
|
|
|
92.74
|
M/S Khan Enterprise
|
83.42
|
|
05/08/2015
|
17/10/2016
|
100
|
|
|
|
|
88
|
BDRIDP/BRG/BET/UZ-St/02(Tender ID 25643)
|
Construction of 2 Vent 3.60*4.00m RCC Box Culvert & 1 Nos U-Drain on Niamati -Deshantorkathi via DC Hat road at ch. 4830m & 1020m (Road ID-504472002) Upazila: Betagi , District: Barguna.
|
BDRIDP
|
barguna-s
|
|
|
|
|
29.60
|
Md.Munibur Rahman
|
23.47
|
|
05/08/2015
|
05/02/2016
|
100
|
|
|
|
|
89
|
BDRIDP/BRG/PAT/CCA-Rd(R)/01 (Tender ID-27058)
|
Rehabilitation of road from Jaliaghata Bridge -Apiler Bridge road from Ch. 0.00-1483m (Road ID-504855032) Upazila: Patharghata , District: Barguna.
|
BDRIDP
|
barguna-s
|
|
1.48
|
|
|
70.90
|
M/S Afser & Co.
|
64.00
|
|
20/08/2015
|
20/08/2016
|
100
|
|
|
|
|
90
|
BDRIDP/BRG/PAT/CCA-St/01(Tender ID-25645)
|
Construction of 5 Nos U-Drain and 1 No Box Culvert on Jaliaghata Bridge - Apiler Bridge road at Ch.350m,704m,896m,974m, 1260m,& 528m (Road ID-504855032) Upazila: Patharghata , District: Barguna.
|
BDRIDP
|
barguna-s
|
|
|
|
|
9.69
|
M/S Humaira Construction
|
7.89
|
|
05/08/2015
|
05/02/2016
|
100
|
|
|
|
|
91
|
BDRIDP/BRG/BET/CCA-Rd/01(Tender ID25646)
|
Improvement of road from Betagi-Barguna (UZR/Bango Bandhu Bazar) -Charkhali Wapda Bazar (Bango Bandhu Bazar Paschim Kauna H/S-Kaialghata- Charkhali) road By BC from Ch. 00-1800m(ID No. 504474298) Upazila: Betagi , District: Barguna.
|
BDRIDP
|
barguna-s
|
|
1.80
|
|
|
77.06
|
M/S Humayun Enterprise
|
65.83
|
|
05/08/2015
|
17/10/2016
|
100
|
|
|
|
|
92
|
BDRIDP/BRG/BET/CCA-Rd/02(Tender ID-25647)
|
Improvement of road from Betagi-Barguna (UZR/Bango Bandhu Bazar) -Charkhali Wapda Bazar (Bango Bandhu Bazar Paschim Kauna H/S-Kaialghata- Charkhali) road By BC from Ch. 1800-3425m(ID No. 504474298) Upazila: Betagi , District: Barguna.
|
BDRIDP
|
barguna-s
|
|
1.63
|
|
|
77.94
|
M/S Khan Enterprise
|
67.72
|
|
05/08/2015
|
17/10/2016
|
100
|
|
|
|
|
93
|
BDRIDP/BRG/BAT/CCA-St/01(Tender ID25648)
|
Construction of 4Nos U-Drain & 2Nos 2Vent 3.00X3.50m RCC Box Culvert on Betagi-Barguna (UZR/Bango Bandhu Bazar) -Charkhali Wapda Bazar (Bango Bandhu Bazar Paschim Kauna H/S-Kaialghata- Charkhali) road at ch.55m,638m,2810m,3200m,250m & 3112m (ID No. 504474
|
BDRIDP
|
barguna-s
|
|
|
|
|
26.38
|
M/S Khan Enterprise
|
21.63
|
|
05/08/2015
|
05/02/2016
|
100
|
|
|
|
|
94
|
BDRIDP/BRG/BAM/CCA-Rd/02(Tender ID-23932)
|
Improvement of road from Bamna Bukabunia road to gafur Master House with 2Nos U-Drain at ch 10m & 300m.
|
BDRIDP
|
barguna-s
|
|
|
|
|
34.18
|
M/S Rudra Enterprise
|
28.36
|
|
18/04/2016
|
18/10/2016
|
100
|
|
|
|
|
95
|
BDRIDP/BRG/AMT/UZ-Rd/01
|
Improvement of road from Amtali Mohiskata RHD -Kalagasia Khasherhat GC via Gulishakhali Bazar at ch 6843m-8843m
|
BDRIDP
|
barguna-s
|
|
2.00
|
|
|
116.84
|
M/S Mithun Traders
|
99.32
|
|
12/09/2016
|
20/07/2017
|
100
|
|
|
|
|
96
|
BDRIDP/BRG/AMT/CCA-Rd/01 (Tender ID 72101)
|
Improvement of road by BC from Angulkata GPS cum cyclone shelter-North Angulkata GPS & Lunch ghat via Khekuani Bazar Road at ch 1900m-4200m.Effective length 2270m and construction of 1 No0.925mx1.20m U-Drain(L=8m) at ch 3250m.
|
BDRIDP
|
barguna-s
|
|
2.30
|
|
|
131.06
|
M/S Mithun Traders
|
109.43
|
|
01/01/2017
|
06/11/2017
|
100
|
|
|
|
|
97
|
BDRIDP/BRG/BAM/CCA-RdR/01 (Tender ID 103724)
|
Rehabilitation of road from Maidha Kakchira GPS cum Cyclone Shelter- Cotto Bhaijora GPS- Khuchnichora GPS cum Cyclone Shelter road from Ch. 930-2100m (Road ID-504194011 Salvage amount Tk 688913.00) Upazila: Bamna , District: Barguna.
|
BDRIDP
|
barguna-s
|
|
1.17
|
|
|
63.02
|
M/S Poly construction
|
56.72
|
|
01/09/2017
|
28/02/2018
|
50
|
|
|
|
|
98
|
BDRIDP/BRG/BAM/CCA-Rd/03
|
Improvement of Road from Tulatala BC road to Bebazia khal GPS cum Cyclone Shelter via Dhalu Sikder House from Ch. 00-500m under Bamna Upazila District Barguna Road ID-504194051 Salvage amount Tk. 27776
|
BDRIDP
|
barguna-s
|
|
0.50
|
|
|
25.23
|
M/S Kohinoor Enterprise
|
22.70
|
|
27/09/2017
|
27/03/2018
|
100
|
|
|
|
|
99
|
BDRIDP/BRG/BAM/CCA-Rd/04
|
Improvement of road from Ramna dawatala battala Culvert- Wapda via Poschim Golaghata GPS Cum Cyclone Shelter at ch 0.00-715m and Construction of 05Nos U-Drain on same road at ch 40m,250m450m,593m & 682m under Bamna Barguna
|
BDRIDP
|
barguna-s
|
|
0.72
|
|
|
51.85
|
M/S Atom Enterprise
|
49.26
|
|
07/03/2018
|
07/09/2018
|
55
|
|
|
|
|
100
|
BDRIDP/BRG/PAT/CCA-Rd/04(ID-146855)
|
Improvement of Amratala GPS Cum Cyclone Shelter Connecting road Kelmegha UP-Mesherpur Bazar via Paschim Amratala GPS road. DPP ID No-504855062 New ID No-504853020 a) Earthwork Ch. 00-1000m. b) Bituminous Carpeting Ch. 00-1000m. c) U-Drain at Ch. 112.00m,
|
BDRIDP
|
barguna-s
|
|
1.00
|
|
|
69.86
|
M/S KK Enterprise
|
68.92
|
|
25/02/2018
|
10/07/2018
|
70
|
|
|
|
|
101
|
BDRIDP/BRG/ AMT/CCA-Rd/02(ID-162870)
|
Improvement of road Khaliyan Bus-Stand to H/O Hasem Mridha via Valoybunia GPS & Nilgonj High School Road by BC From Ch. 00m to 1450m Including structure under Amtali Upazila, District: Barguna [Road ID-504094087]
|
BDRIDP
|
barguna-s
|
|
1.45
|
|
|
91.65
|
Md. Abul Kalm Azad
|
89.63
|
|
30/10/2018
|
|
55
|
|
|
|
|
102
|
BDRIDP/BRG/ BAM/UN-Rd/02(ID-162871)
|
Improvement of Bamna UP Office-Gudhighata Bazar via Kuchnichora GPS Ramna UP Office-Gudhighata Bazar via Kuchinichora GPS Road by BC From Ch. 1370m to 2370m Earthen from CH. 1000m to 2000m & 1 Nos U-Drain at Ch. 1940m under Bamna Upazila, District: Bargun
|
BDRIDP
|
barguna-s
|
|
1.00
|
|
|
59.86
|
M/S Khankaker Sahin Ahmed.Paschim Goalchatmot. Faridpur
|
53.87
|
|
14/05/2018
|
14/11/2018
|
40
|
|
|
|
|
103
|
BDRIDP/BRG/BAM/CCA-Rd/05(ID-162872)
|
Improvement of Uttar Kakchira Bazar Chalavanga Launch Ghat via Gudhighata Adarsha GPS cum Cyclone Shelter Road by BC From Ch. 00m to 1000m under Bamna Upazila, District: Barguna [Road ID-504194080]
|
BDRIDP
|
barguna-s
|
|
0.00
|
|
|
59.19
|
M/S Khankaker Sahin Ahmed.Paschim Goalchatmot. Faridpur
|
53.27
|
|
14/05/2018
|
14/11/2018
|
0
|
|
|
|
|
104
|
BDRIDP/BRG/ BAM/UN-Rd/03(ID-162873)
|
Improvement of Dawatala UP Office-Uttar Kakchira Bazar via Nobogram GPS Road by BC From Ch. 00m to 1000m under Bamna Upazila, District: Barguna [Road ID-504193012] (Salvage amount Tk 426251.00).
|
BDRIDP
|
barguna-s
|
|
1.00
|
|
|
73.79
|
M/S Khankaker Sahin Ahmed.Paschim Goalchatmot. Faridpur
|
66.41
|
|
21/05/2018
|
21/11/2018
|
40
|
|
|
|
|
105
|
BDRIDP/BRG/ PAT/GHT/01
|
Construction of Gfhat at Kakchira Bazar(GC)
|
BDRIDP
|
barguna-s
|
|
|
|
|
29.16
|
M/S Arif & Asif Construction. Sadar road Barguna.
|
28.64
|
|
13/05/2018
|
13/09/2018
|
0
|
|
|
|
|
106
|
BDRIDP/BRG/ BAM/GHT/01
|
Construction of Gfhat at Bukabunia Bazar
|
BDRIDP
|
barguna-s
|
|
|
|
|
30.30
|
M/S Arif & Asif Construction. Sadar road Barguna.
|
30.19
|
|
27/05/2018
|
27/09/2018
|
10
|
|
|
|
|
107
|
BDRIDP/BRG/ TAL/GHT/01
|
Construction of Gfhat at Taltali Bazar(GC)
|
BDRIDP
|
barguna-s
|
|
|
|
|
34.39
|
M/S jahanara Islam,College Road,Barguna
|
32.67
|
|
02/07/2018
|
02/11/2018
|
10
|
|
|
|
|
108
|
BDRIDP/BRG/AMT/UZ-St/01
|
Construction of 21.00n RCC Girder Bridge on Amtali Mohiskata R&H - Kalagasia Kaserhat GC via Gulishakhali Bazar at ch 3790m under Amtali Upazila.Barguna.
|
BDRIDP
|
barguna-s
|
|
|
|
|
155.45
|
Md.Enayet Hossain
|
147.64
|
|
14/05/2018
|
14/01/2019
|
0
|
|
|
|
|
109
|
BDRIDP/BRG/PAT/CCA-Rd/05
|
Improvement of Kamarer Hat- Thakurbari to Katakhali Union road under Patharghata Upazila District Barguna Road ID-504854067a Earthwork Ch. 0.00m-250.00mb Carpeting BC Ch. 0.00m-250.00m
|
BDRIDP
|
barguna-s
|
|
0.25
|
|
|
17.15
|
M/S Othoi Enterprise,Dakkhin monosha,Purbo Dhupoti, Barguna Sadar,barguna.
|
16.29
|
|
01/07/2018
|
31/12/2018
|
55
|
|
|
|
|
110
|
BDRIDP/BRG/PAT/CCA-Rd/06
|
Improvement of Gabbaria GPS-Wapda Kamal shop via Tafalbaria Madrasha road under Patharghata Upazila District Barguna Road ID- 504855113a Earthwork Ch. 0.00m-2538.00mb Carpeting BC Ch. 0.00m-2538.00mc U-Drain 04 Nos at Ch. 628m 962m 1538m & 1950m
|
BDRIDP
|
barguna-s
|
|
2.54
|
|
|
168.35
|
M/S Akon Traders, pathorghata pauroshova, Barguna
|
166.66
|
|
01/07/2018
|
30/12/2018
|
15
|
|
|
|
|
111
|
BDRIDP/BRG/TAL/UZ-St/02(190363)
|
Construction of 36.06m Long RCC Girder Bridge on Kathupatra GC-Bogirhat GC via H/O Patoary & Panchakoralia Bazar road at Ch. 9714.00m Road ID -504872005 under Taltali Upazila Barguna District.
|
BDRIDP
|
barguna-s
|
|
|
|
|
232.79
|
M/S Arif & Asif Construction & M/S Mithun Traders (JV0
|
209.51
|
|
01/08/2018
|
28/05/2018
|
20
|
|
|
|
|
112
|
BDRIDP/BRG/TAL/UZ-St/01(188388)
|
Construction of 50.06m RCC Girder Bridge on Kachupatra GC- Bogirhat GC via Panchakoralia at Ch. 350.00m under Taltali Upazila District Barguna Road ID- 504872005
|
BDRIDP
|
barguna-s
|
|
|
|
|
290.10
|
M/S Arif & Asif Construction & M/S Mithun Traders (JV0
|
274.13
|
|
01/08/2018
|
30/05/2019
|
0
|
|
|
|
|
113
|
BDRIDP/BRG/BAM/CCA-Rd/06
|
Improvement of road Chalitabunia Bazar Bukabunia UP Dr. Lublu House.ID No-504194004 (a) Earth wark from Ch. 1739m-3174m. (b) Carpeting BC from Ch. 1739m-3174m. (c) Construction of 1 Nos 4.00mx3.00m & 1 Nos 1.5mX1.5m Box Culvert at Ch. 2616m & 2424m. 2 Nos
|
BDRIDP
|
barguna-s
|
|
1.44
|
|
|
123.35
|
M/S Akon Trading Hospital Road ,Bamna, Barguna
|
117.18
|
|
13/08/2018
|
13/02/2019
|
15
|
|
|
|
|
114
|
BDRIDP/BRG/BET/UZ-Ew/01
|
Badnikhali GC- Kazirhat GC via west karuna High school road by Earth Work from ch 1800.00m-2500.00m under Betagi.
|
BDRIDP
|
barguna-s
|
|
0.70
|
|
|
3.61
|
LCS Shapon
|
3.61
|
|
01/02/2015
|
30/04/2015
|
100
|
|
|
|
|
115
|
BDRIDP/BRG/BET/UZ-Ew/02
|
Badnikhali GC- Kazirhat GC via west karuna High school road by Earth Work from ch 2500.00m-3700.00m under Betagi.
|
BDRIDP
|
barguna-s
|
|
1.20
|
|
|
4.19
|
LCS Shanu
|
4.19
|
|
01/02/2015
|
30/04/2015
|
100
|
|
|
|
|
116
|
BDRIDP/BRG/BET/UZ-Ew/03
|
Resectioning of road from Niamati - Deshanterkathi via DC Hat Ch. 3900-5363m
|
BDRIDP
|
barguna-s
|
|
1.46
|
|
|
4.94
|
LCS Hemayet
|
4.94
|
|
09/06/2015
|
30/08/2015
|
100
|
|
|
|
|
117
|
BDRIDP/BRG/AMT/CCA-Ew/01
|
Improvement of road from Bamna Bukabunia road to gafur Master House at WAPDA road from ch 0.00-600.00m
|
BDRIDP
|
barguna-s
|
|
0.60
|
|
|
1.81
|
Mrs Beauty Begum
|
1.81
|
|
20/06/2016
|
20/06/2016
|
100
|
|
|
|
|
118
|
BDRIDP/BRG/BAT/CCA-Ew/01(a)
|
Re-section of road from Betagi Barguna(UZR/Bangobandhu Bazar)-Charkhali Wapda Bazar (Bangobandhu Bazar-Paschim Karuna H/S -Kaialghata-Charkhali)road by Earthen at ch 0.00-500.00m under Betagi,Barguna.
|
BDRIDP
|
barguna-s
|
|
0.50
|
|
|
4.00
|
LCS Nur-E-Alom
|
4.00
|
|
01/01/2016
|
30/05/2016
|
100
|
|
|
|
|
119
|
BDRIDP/BRG/BAT/CCA-Ew/01(b)
|
Re-section of road from Betagi Barguna(UZR/Bangobandhu Bazar)-Charkhali Wapda Bazar (Bangobandhu Bazar-Paschim Karuna H/S -Kaialghata-Charkhali)road by Earthen at ch 500.00-2200.00m under Betagi,Barguna
|
BDRIDP
|
barguna-s
|
|
1.70
|
|
|
4.77
|
LCS Forkan Mollik
|
4.77
|
|
01/01/2016
|
30/05/2016
|
100
|
|
|
|
|
120
|
BDRIDP/BRG/BAT/CCA-Ew/01(c)
|
Re-section of road from Betagi Barguna(UZR/Bangobandhu Bazar)-Charkhali Wapda Bazar (Bangobandhu Bazar-Paschim Karuna H/S -Kaialghata-Charkhali)road by Earthen at ch2200.00-3425.00m under Betagi,Barguna
|
BDRIDP
|
barguna-s
|
|
1.23
|
|
|
4.81
|
LCS Monir Hosain
|
4.81
|
|
01/01/2016
|
30/05/2016
|
100
|
|
|
|
|
121
|
BDRIDP/BRG/BAM/CCA-Ew/01
|
Re-section of road from Bamna Bukabunia road-Gafur Master Hiouse at RAPDA road by Earthen at ch 00.00-600.00m under Bamna,Barguna
|
BDRIDP
|
barguna-s
|
|
0.60
|
|
|
1.81
|
LCS Mrs. Bauety Begum
|
1.81
|
|
03/06/2016
|
20/06/2016
|
100
|
|
|
|
|
122
|
BDRIDP/BRG/PAT/CCA-Ew/01
|
Re-section of road from Patharghata Jhaliaghata Bridge-Apeler Bridge road by Earthen at ch 00.00-1483.00m under Patharghata,Barguna
|
BDRIDP
|
barguna-s
|
|
1.48
|
|
|
2.53
|
LCS Khadija Begum
|
2.53
|
|
03/06/2016
|
20/06/2016
|
100
|
|
|
|
|
123
|
BDRIDP/BRG/AMT/CCA-Ew/02
|
Improvement of road by Earth workfrom Amtali-Moshiskata RHD-Kalagasia Khasher Hat GC via Gulishakhali Bazar at ch 7500m-7900m under Amtali,Barguna.
|
BDRIDP
|
barguna-s
|
|
0.40
|
|
|
3.70
|
Md.Shahidul Islam
|
0.00
|
|
01/09/2016
|
30/03/2017
|
100
|
|
|
|
|
124
|
BDRIDP/BRG/AMT/CCA-Ew/03
|
Improvement of road by Earth workfrom Amtali-Moshiskata RHD-Kalagasia Khasher Hat GC via Gulishakhali Bazar at ch 7900m-8400m under Amtali,Barguna.
|
BDRIDP
|
barguna-s
|
|
0.50
|
|
|
3.14
|
Md Shohel Musulli
|
0.00
|
|
01/09/2016
|
30/03/2017
|
100
|
|
|
|
|
125
|
BDRIDP/BRG/AMT/CCA-Ew/04
|
Improvement of road by Earth workfrom Amtali-Moshiskata RHD-Kalagasia Khasher Hat GC via Gulishakhali Bazar at ch 8400m-8843m under Amtali,Barguna.
|
BDRIDP
|
barguna-s
|
|
0.44
|
|
|
3.23
|
Md.Shahin Gazi
|
3.23
|
|
01/09/2016
|
30/03/2017
|
100
|
|
|
|
|
126
|
BDRIDP/BRG/PAT/UZ-Rd/01
|
Improvement of Kalmegha - Charduani GC Road from ch 2134m-4200m(ID No-504852005)
|
BDRIDP
|
barguna-s
|
|
2.07
|
|
|
2.46
|
Md Shah Alom
|
2.46
|
|
30/05/2017
|
|
100
|
|
|
|
|
127
|
BDRIDP/BRG/PAT/UZ-Rd/02
|
Improvement of Kalmegha - Charduani GC Road from ch 4200m-5550m(ID No-504852005)
|
BDRIDP
|
barguna-s
|
|
1.35
|
|
|
2.61
|
Md. A.Rahim
|
2.61
|
|
30/05/2017
|
|
100
|
|
|
|
|
128
|
BDRIDP/BRG/PAT/UZ-Rd/03
|
Improvement of Kalmegha - Charduani GC Road from ch 5550m-6600m(ID No-504852005)
|
BDRIDP
|
barguna-s
|
|
1.05
|
|
|
2.47
|
Monju Rani Adhikay
|
2.47
|
|
30/05/2017
|
|
100
|
|
|
|
|
129
|
BDRIDP/BRG/PAT/UZ-Rd/04
|
Improvement of Kalmegha - Charduani GC Road from ch 6600m-6944m(ID No-504852005)
|
BDRIDP
|
barguna-s
|
|
0.34
|
|
|
1.71
|
Gonesh Chandra
|
1.71
|
|
30/05/2017
|
|
100
|
|
|
|
|
130
|
BDRIDP/BRG/PAT/UZ-Rd/05
|
Improvement of Kalmegha - Charduani GC Road from ch 6944m-7500m(ID No-504852005)
|
BDRIDP
|
barguna-s
|
|
0.56
|
|
|
3.29
|
Shibani Rani
|
3.29
|
|
30/05/2017
|
|
100
|
|
|
|
|
131
|
BDRIDP/BRG/PAT/UZ-Rd/06
|
Improvement of Kalmegha - Charduani GC Road from ch 7500m-8100m(ID No-504852005)
|
BDRIDP
|
barguna-s
|
|
0.60
|
|
|
2.64
|
Nikunjo Majhi
|
2.64
|
|
30/05/2017
|
|
100
|
|
|
|
|
132
|
BDRIDP/BRG/PAT/CCA-EW/02
|
Improvement of road from Chaherabad GPS cum Cyclone Shelter (Chaherabad Dali Bari - Subendra Nath High school) at ch 0m-1435m
|
BDRIDP
|
barguna-s
|
|
1.44
|
|
|
2.27
|
Shyamol
|
2.27
|
|
|
|
100
|
|
|
|
|
133
|
BDRIDP/BRG/PAT/CCA-EW/03
|
Improvement of road from Kathal Toli GPS Cum Cyclone shelter Connecting road ( Kathaltoli Bazar -Parighata via Kathaltoli GPS Road )at ch 0m-2230m
|
BDRIDP
|
barguna-s
|
|
2.23
|
|
|
3.02
|
Md.Mozibar
|
3.02
|
|
|
|
100
|
|
|
|
|
134
|
BDRIDP/BRG/TAL/UZ-EW/01(Group-1)
|
Improvement of Kachupatra Gc - bogir Hat GC via Panchakoralia Bazar road by earth at ch 4560m-8150m under Taltali,Barguna
|
BDRIDP
|
barguna-s
|
|
3.59
|
|
|
3.53
|
Lucky Begum
|
3.53
|
|
30/06/2017
|
|
100
|
|
|
|
|
135
|
BDRIDP/BRG/TAL/UZ-EW/01(Group-2)
|
Improvement of Kachupatra Gc - bogir Hat GC via Panchakoralia Bazar road by earth at ch 4560m-8150m under Taltali,Barguna
|
BDRIDP
|
barguna-s
|
|
3.59
|
|
|
3.42
|
Rashida Begum
|
3.42
|
|
30/06/2017
|
|
100
|
|
|
|
|
136
|
BDRIDP/BRG/TAL/UZ-EW/01(Group-3)
|
Improvement of Kachupatra Gc - bogir Hat GC via Panchakoralia Bazar road by earth at ch 4560m-8150m under Taltali,Barguna
|
BDRIDP
|
barguna-s
|
|
3.59
|
|
|
3.12
|
Hamida Begum
|
3.12
|
|
30/06/2017
|
|
100
|
|
|
|
|
137
|
BDRIDP/BRG/TAL/UZ-EW/01(Group-4)
|
Improvement of Kachupatra Gc - bogir Hat GC via Panchakoralia Bazar road by earth at ch 4560m-8150m under Taltali,Barguna
|
BDRIDP
|
barguna-s
|
|
3.59
|
|
|
2.62
|
Rahima Begum
|
2.62
|
|
30/06/2017
|
|
100
|
|
|
|
|
138
|
BDRIDP/BRG/TAL/UZ-EW/01(Group-5)
|
Improvement of Kachupatra Gc - bogir Hat GC via Panchakoralia Bazar road by earth at ch 4560m-8150m under Taltali,Barguna
|
BDRIDP
|
barguna-s
|
|
3.59
|
|
|
2.71
|
shahin Patoary
|
2.71
|
|
30/06/2017
|
|
100
|
|
|
|
|
139
|
BDRIDP/BRG/SDR/UZ-Ew/01(Group-2)
|
Improvement of road from Barguna - Lakurtala -Dhupati - Chandukhali GC at ch 9350m-10025m
|
BDRIDP
|
barguna-s
|
|
0.68
|
|
|
4.16
|
Abdus salam
|
4.16
|
|
30/06/2017
|
|
100
|
|
|
|
|
140
|
BDRIDP/BRG/AMT/UZ-EW/01
|
Resectioning of road from Gazipur GC-Badura GC via Atharogasia UP Ch.3600m-4220m
|
BDRIDP
|
barguna-s
|
|
0.62
|
|
|
4.98
|
Md.Shahajahan Fakir
|
4.98
|
|
21/11/2017
|
21/05/2018
|
100
|
|
|
|
|
141
|
BDRIDP/BRG/AMT/UZ-EW/02
|
Resectioning of road from Gazipur GC-Badura GC via Atharogasia UP Ch.4200m-4850m
|
BDRIDP
|
barguna-s
|
|
0.65
|
|
|
4.76
|
Md.Rubel chawkider
|
4.76
|
|
21/11/2017
|
21/05/2018
|
100
|
|
|
|
|
142
|
BDRIDP/BRG/AMT/UZ-EW/03
|
Resectioning of road from Gazipur GC-Badura GC via Atharogasia UP Ch.5860m-6285m
|
BDRIDP
|
barguna-s
|
|
0.43
|
|
|
4.52
|
Md.Shahajahan
|
4.52
|
|
28/01/2018
|
30/04/2018
|
100
|
|
|
|
|
143
|
BDRIDP/BRG/BET/UZ-Rd/01
|
Badnikhali GC- Kazirhat GC via west karuna High school road by BC from ch 0.00m-2500.00m under Betagi.
|
BDRIDP
|
betagi
|
|
2.50
|
|
|
157.76
|
M/S Khan Enterprise
|
137.12
|
|
07/02/2015
|
06/02/2016
|
0
|
|
|
|
|
144
|
BDRIDP/BRG/BET/UZ-Rd/02
|
Badnikhali GC- Kazirhat GC via west karuna High school road by BC from ch 2500.00m-3700.00m under Betagi.
|
BDRIDP
|
betagi
|
|
1.20
|
|
|
73.73
|
M/S Khan Enterprise
|
63.39
|
|
07/02/2015
|
18/04/2016
|
0
|
|
|
|
|
145
|
BDRIDP/BRG/BET/UZ-St/01
|
Construction of 2Nos 4.00m*3.30m 2Vent Box culvert on Badnikhali GC- Kazirhat GC via west karuna High school road by BC at ch 2621.00m & 2891.00m under Betagi.
|
BDRIDP
|
betagi
|
|
|
|
|
35.29
|
M/S Safi Enterprise
|
29.46
|
|
01/02/2015
|
01/02/2016
|
0
|
|
|
|
|
146
|
BDRIDP/BRG/BET/UZ-Rd(R)/03 (Tender ID 25642)
|
Rehabilitation of road from Niamati- Deshanterkathi via DC Hat by BC Ch. 3900-5363.00 (Road ID-504472002) Upazila: Betagi , District: Barguna.
|
BDRIDP
|
betagi
|
|
|
|
|
92.74
|
M/S Khan Enterprise
|
83.42
|
|
05/08/2015
|
17/10/2016
|
0
|
|
|
|
|
147
|
BDRIDP/BRG/BET/UZ-St/02(Tender ID 25643)
|
Construction of 2 Vent 3.60*4.00m RCC Box Culvert & 1 Nos U-Drain on Niamati -Deshantorkathi via DC Hat road at ch. 4830m & 1020m (Road ID-504472002) Upazila: Betagi , District: Barguna.
|
BDRIDP
|
betagi
|
|
|
|
|
29.60
|
Md.Munibur Rahman
|
23.47
|
|
05/08/2015
|
05/02/2016
|
0
|
|
|
|
|
148
|
BDRIDP/BRG/BET/CCA-Rd/01(Tender ID25646)
|
Improvement of road from Betagi-Barguna (UZR/Bango Bandhu Bazar) -Charkhali Wapda Bazar (Bango Bandhu Bazar Paschim Kauna H/S-Kaialghata- Charkhali) road By BC from Ch. 00-1800m(ID No. 504474298) Upazila: Betagi , District: Barguna.
|
BDRIDP
|
betagi
|
|
1.80
|
|
|
77.06
|
M/S Humayun Enterprise
|
65.83
|
|
05/08/2015
|
17/10/2016
|
0
|
|
|
|
|
149
|
BDRIDP/BRG/BET/CCA-Rd/02(Tender ID-25647)
|
Improvement of road from Betagi-Barguna (UZR/Bango Bandhu Bazar) -Charkhali Wapda Bazar (Bango Bandhu Bazar Paschim Kauna H/S-Kaialghata- Charkhali) road By BC from Ch. 1800-3425m(ID No. 504474298) Upazila: Betagi , District: Barguna.
|
BDRIDP
|
betagi
|
|
1.63
|
|
|
77.94
|
M/S Khan Enterprise
|
67.72
|
|
05/08/2015
|
17/10/2016
|
0
|
|
|
|
|
150
|
BDRIDP/BRG/BAT/CCA-St/01(Tender ID25648)
|
Construction of 4Nos U-Drain & 2Nos 2Vent 3.00X3.50m RCC Box Culvert on Betagi-Barguna (UZR/Bango Bandhu Bazar) -Charkhali Wapda Bazar (Bango Bandhu Bazar Paschim Kauna H/S-Kaialghata- Charkhali) road at ch.55m,638m,2810m,3200m,250m & 3112m (ID No. 504474
|
BDRIDP
|
betagi
|
|
|
|
|
26.38
|
M/S Khan Enterprise
|
21.63
|
|
05/08/2015
|
05/02/2016
|
0
|
|
|
|
|
151
|
BDRIDP/BRG/BET/UZ-Ew/01
|
Badnikhali GC- Kazirhat GC via west karuna High school road by Earth Work from ch 1800.00m-2500.00m under Betagi.
|
BDRIDP
|
betagi
|
|
0.70
|
|
|
3.61
|
LCS Shapon
|
3.61
|
|
01/02/2015
|
30/04/2015
|
0
|
|
|
|
|
152
|
BDRIDP/BRG/BET/UZ-Ew/02
|
Badnikhali GC- Kazirhat GC via west karuna High school road by Earth Work from ch 2500.00m-3700.00m under Betagi.
|
BDRIDP
|
betagi
|
|
1.20
|
|
|
4.19
|
LCS Shanu
|
4.19
|
|
01/02/2015
|
30/04/2015
|
0
|
|
|
|
|
153
|
BDRIDP/BRG/BAT/CCA-Ew/01(a)
|
Re-section of road from Betagi Barguna(UZR/Bangobandhu Bazar)-Charkhali Wapda Bazar (Bangobandhu Bazar-Paschim Karuna H/S -Kaialghata-Charkhali)road by Earthen at ch 0.00-500.00m under Betagi,Barguna.
|
BDRIDP
|
betagi
|
|
0.50
|
|
|
4.00
|
LCS Nur-E-Alom
|
4.00
|
|
01/01/2016
|
30/05/2016
|
0
|
|
|
|
|
154
|
BDRIDP/BRG/BAT/CCA-Ew/01(b)
|
Re-section of road from Betagi Barguna(UZR/Bangobandhu Bazar)-Charkhali Wapda Bazar (Bangobandhu Bazar-Paschim Karuna H/S -Kaialghata-Charkhali)road by Earthen at ch 500.00-2200.00m under Betagi,Barguna
|
BDRIDP
|
betagi
|
|
1.70
|
|
|
4.77
|
LCS Forkan Mollik
|
4.77
|
|
01/01/2016
|
30/05/2016
|
0
|
|
|
|
|
155
|
BDRIDP/BRG/BAT/CCA-Ew/01(c)
|
Re-section of road from Betagi Barguna(UZR/Bangobandhu Bazar)-Charkhali Wapda Bazar (Bangobandhu Bazar-Paschim Karuna H/S -Kaialghata-Charkhali)road by Earthen at ch2200.00-3425.00m under Betagi,Barguna
|
BDRIDP
|
betagi
|
|
1.23
|
|
|
4.81
|
LCS Monir Hosain
|
4.81
|
|
01/01/2016
|
30/05/2016
|
0
|
|
|
|
|
156
|
BDRIDP/BRG/PAT/UN-Rd/01
|
Rehabilitation of road from Lemua GC - C&B Bazar(RHD) via Hatempur road by BC from ch 2230.00m-4230.00m(ID NO-504853008)
|
BDRIDP
|
patharghata
|
|
2.00
|
|
|
105.04
|
Md.Nizam Uddin
|
104.96
|
|
26/04/2015
|
31/12/2016
|
0
|
|
|
|
|
157
|
BDRIDP/BRG/PAT/CCA-Rd(R)/01 (Tender ID-27058)
|
Rehabilitation of road from Jaliaghata Bridge -Apiler Bridge road from Ch. 0.00-1483m (Road ID-504855032) Upazila: Patharghata , District: Barguna.
|
BDRIDP
|
patharghata
|
|
1.48
|
|
|
70.90
|
M/S Afser & Co.
|
64.00
|
|
20/08/2015
|
20/08/2016
|
0
|
|
|
|
|
158
|
BDRIDP/BRG/PAT/CCA-St/01(Tender ID-25645)
|
Construction of 5 Nos U-Drain and 1 No Box Culvert on Jaliaghata Bridge - Apiler Bridge road at Ch.350m,704m,896m,974m, 1260m,& 528m (Road ID-504855032) Upazila: Patharghata , District: Barguna.
|
BDRIDP
|
patharghata
|
|
|
|
|
9.69
|
M/S Humaira Construction
|
7.89
|
|
05/08/2015
|
05/02/2016
|
0
|
|
|
|
|
159
|
BDRIDP/BRG/AMT/UZ-Rd/01
|
Improvement of road from Amtali Mohiskata RHD -Kalagasia Khasherhat GC via Gulishakhali Bazar at ch 6843m-8843m
|
BDRIDP
|
patharghata
|
|
2.00
|
|
|
116.84
|
M/S Mithun Traders
|
99.32
|
|
12/09/2016
|
20/07/2017
|
0
|
|
|
|
|
160
|
BDRIDP/BRG/ PAT/GHT/01
|
Construction of Gfhat at Kakchira Bazar(GC)
|
BDRIDP
|
patharghata
|
|
|
|
|
29.16
|
M/S Arif & Asif Construction. Sadar road Barguna.
|
28.64
|
|
13/05/2018
|
13/09/2018
|
0
|
|
|
|
|
161
|
BDRIDP/BRG/PAT/CCA-Rd/05
|
Improvement of Kamarer Hat- Thakurbari to Katakhali Union road under Patharghata Upazila District Barguna Road ID-504854067a Earthwork Ch. 0.00m-250.00mb Carpeting BC Ch. 0.00m-250.00m
|
BDRIDP
|
patharghata
|
|
0.25
|
|
|
17.15
|
M/S Othoi Enterprise,Dakkhin monosha,Purbo Dhupoti, Barguna Sadar,barguna.
|
16.29
|
|
01/07/2018
|
31/12/2018
|
0
|
|
|
|
|
162
|
BDRIDP/BRG/PAT/CCA-Rd/06
|
Improvement of Gabbaria GPS-Wapda Kamal shop via Tafalbaria Madrasha road under Patharghata Upazila District Barguna Road ID- 504855113a Earthwork Ch. 0.00m-2538.00mb Carpeting BC Ch. 0.00m-2538.00mc U-Drain 04 Nos at Ch. 628m 962m 1538m & 1950m
|
BDRIDP
|
patharghata
|
|
2.54
|
|
|
168.35
|
M/S Akon Traders, pathorghata pauroshova, Barguna
|
166.66
|
|
01/07/2018
|
30/12/2018
|
0
|
|
|
|
|
163
|
BDRIDP/BRG/PAT/CCA-Ew/01
|
Re-section of road from Patharghata Jhaliaghata Bridge-Apeler Bridge road by Earthen at ch 00.00-1483.00m under Patharghata,Barguna
|
BDRIDP
|
patharghata
|
|
1.48
|
|
|
2.53
|
LCS Khadija Begum
|
2.53
|
|
03/06/2016
|
20/06/2016
|
0
|
|
|
|
|
164
|
BDRIDP/BRG/PAT/UZ-Rd/01
|
Improvement of Kalmegha - Charduani GC Road from ch 2134m-4200m(ID No-504852005)
|
BDRIDP
|
patharghata
|
|
2.07
|
|
|
2.46
|
Md Shah Alom
|
2.46
|
|
30/05/2017
|
|
0
|
|
|
|
|
165
|
BDRIDP/BRG/PAT/UZ-Rd/02
|
Improvement of Kalmegha - Charduani GC Road from ch 4200m-5550m(ID No-504852005)
|
BDRIDP
|
patharghata
|
|
1.35
|
|
|
2.61
|
Md. A.Rahim
|
2.61
|
|
30/05/2017
|
|
0
|
|
|
|
|
166
|
BDRIDP/BRG/PAT/UZ-Rd/03
|
Improvement of Kalmegha - Charduani GC Road from ch 5550m-6600m(ID No-504852005)
|
BDRIDP
|
patharghata
|
|
1.05
|
|
|
2.47
|
Monju Rani Adhikay
|
2.47
|
|
30/05/2017
|
|
0
|
|
|
|
|
167
|
BDRIDP/BRG/PAT/UZ-Rd/04
|
Improvement of Kalmegha - Charduani GC Road from ch 6600m-6944m(ID No-504852005)
|
BDRIDP
|
patharghata
|
|
0.34
|
|
|
1.71
|
Gonesh Chandra
|
1.71
|
|
30/05/2017
|
|
0
|
|
|
|
|
168
|
BDRIDP/BRG/PAT/UZ-Rd/05
|
Improvement of Kalmegha - Charduani GC Road from ch 6944m-7500m(ID No-504852005)
|
BDRIDP
|
patharghata
|
|
0.56
|
|
|
3.29
|
Shibani Rani
|
3.29
|
|
30/05/2017
|
|
0
|
|
|
|
|
169
|
BDRIDP/BRG/PAT/UZ-Rd/06
|
Improvement of Kalmegha - Charduani GC Road from ch 7500m-8100m(ID No-504852005)
|
BDRIDP
|
patharghata
|
|
0.60
|
|
|
2.64
|
Nikunjo Majhi
|
2.64
|
|
30/05/2017
|
|
0
|
|
|
|
|
170
|
BDRIDP/BRG/PAT/CCA-EW/02
|
Improvement of road from Chaherabad GPS cum Cyclone Shelter (Chaherabad Dali Bari - Subendra Nath High school) at ch 0m-1435m
|
BDRIDP
|
patharghata
|
|
1.44
|
|
|
2.27
|
Shyamol
|
2.27
|
|
|
|
0
|
|
|
|
|
171
|
BDRIDP/BRG/PAT/CCA-EW/03
|
Improvement of road from Kathal Toli GPS Cum Cyclone shelter Connecting road ( Kathaltoli Bazar -Parighata via Kathaltoli GPS Road )at ch 0m-2230m
|
BDRIDP
|
patharghata
|
|
2.23
|
|
|
3.02
|
Md.Mozibar
|
3.02
|
|
|
|
0
|
|
|
|
|
172
|
BDRIDP/BRG/ TAL/GHT/01
|
Construction of Gfhat at Taltali Bazar(GC)
|
BDRIDP
|
Taltali
|
|
|
|
|
34.39
|
M/S jahanara Islam,College Road,Barguna
|
32.67
|
|
02/07/2018
|
02/11/2018
|
0
|
|
|
|
|
173
|
BDRIDP/BRG/TAL/UZ-St/02(190363)
|
Construction of 36.06m Long RCC Girder Bridge on Kathupatra GC-Bogirhat GC via H/O Patoary & Panchakoralia Bazar road at Ch. 9714.00m Road ID -504872005 under Taltali Upazila Barguna District.
|
BDRIDP
|
Taltali
|
|
|
|
|
232.79
|
M/S Arif & Asif Construction & M/S Mithun Traders (JV0
|
209.51
|
|
01/08/2018
|
28/05/2018
|
0
|
|
|
|
|
174
|
BDRIDP/BRG/TAL/UZ-St/01(188388)
|
Construction of 50.06m RCC Girder Bridge on Kachupatra GC- Bogirhat GC via Panchakoralia at Ch. 350.00m under Taltali Upazila District Barguna Road ID- 504872005
|
BDRIDP
|
Taltali
|
|
|
|
|
290.10
|
M/S Arif & Asif Construction & M/S Mithun Traders (JV0
|
274.13
|
|
01/08/2018
|
30/05/2019
|
0
|
|
|
|
|
175
|
BDRIDP/BRG/TAL/UZ-EW/01(Group-1)
|
Improvement of Kachupatra Gc - bogir Hat GC via Panchakoralia Bazar road by earth at ch 4560m-8150m under Taltali,Barguna
|
BDRIDP
|
Taltali
|
|
3.59
|
|
|
3.53
|
Lucky Begum
|
3.53
|
|
30/06/2017
|
|
0
|
|
|
|
|
176
|
BDRIDP/BRG/TAL/UZ-EW/01(Group-2)
|
Improvement of Kachupatra Gc - bogir Hat GC via Panchakoralia Bazar road by earth at ch 4560m-8150m under Taltali,Barguna
|
BDRIDP
|
Taltali
|
|
3.59
|
|
|
3.42
|
Rashida Begum
|
3.42
|
|
30/06/2017
|
|
0
|
|
|
|
|
177
|
BDRIDP/BRG/TAL/UZ-EW/01(Group-3)
|
Improvement of Kachupatra Gc - bogir Hat GC via Panchakoralia Bazar road by earth at ch 4560m-8150m under Taltali,Barguna
|
BDRIDP
|
Taltali
|
|
3.59
|
|
|
3.12
|
Hamida Begum
|
3.12
|
|
30/06/2017
|
|
0
|
|
|
|
|
178
|
BDRIDP/BRG/TAL/UZ-EW/01(Group-4)
|
Improvement of Kachupatra Gc - bogir Hat GC via Panchakoralia Bazar road by earth at ch 4560m-8150m under Taltali,Barguna
|
BDRIDP
|
Taltali
|
|
3.59
|
|
|
2.62
|
Rahima Begum
|
2.62
|
|
30/06/2017
|
|
0
|
|
|
|
|
179
|
BDRIDP/BRG/TAL/UZ-EW/01(Group-5)
|
Improvement of Kachupatra Gc - bogir Hat GC via Panchakoralia Bazar road by earth at ch 4560m-8150m under Taltali,Barguna
|
BDRIDP
|
Taltali
|
|
3.59
|
|
|
2.71
|
shahin Patoary
|
2.71
|
|
30/06/2017
|
|
0
|
|
|
|
|
180
|
CRMIDP/BRGN/W-202
|
Chandukhali Bazar
|
CRMIDP
|
betagi
|
|
|
|
67
|
268.00
|
M/S humayan Enterprise
|
224.62
|
12/04/2020
|
|
30/06/2022
|
80
|
149.87
|
67
|
26/07/2022
|
|
181
|
DIRIP-2/VR(STR)-07/Barguna/2018-19
|
Construction of 30m long PSC bridge at Ch:100m on Bamna-Doutala-Sherebangla school- Nantu bari road under Bamna Upazila ,District -Barguna
|
DIRIP-2
|
bamna
|
504195036
|
|
30.00
|
|
217.50
|
M/S MM Builders
|
183.18
|
|
|
|
90
|
|
|
31/12/2021
|
|
182
|
DIRIP-2/UNR(STR)-12/Barguna/2018-19
|
Construction of 24m long RCC Bridge at Ch. 1290m on Kakchira UP RHD - Fokir Hat via Khotasbag Road under Patharghata Upazila District Barguna Road ID- 504853015
|
DIRIP-2
|
bamna
|
504853015
|
24.00
|
|
|
174.41
|
M/S MM Builders
|
149.94
|
|
|
|
100
|
|
|
31/12/2021
|
|
183
|
DIRIP-2/VRBC-01/Barguna/2017-18 (TID-182446)
|
Improvement of Road from Bamna Douatola Road Sher-E-Bangla school Nantu Bari Road - Sher-E-Bangla high school - Badsha Bari Jame mosque from Ch. 00m-1530m under Bamna Upazila District Barguna Road ID- 504195036 Salvage amount Tk. 496022
|
DIRIP-2
|
bamna
|
504195036
|
1.53
|
|
|
119.56
|
Md.Golam sorwar.Sonali Para,Barguna.Mob-01770344212
|
113.58
|
18/06/2018
|
18/06/2018
|
25/01/2019
|
100
|
272.60
|
|
18/01/2021
|
|
184
|
DIRIP-2/UZRBC-01/Barguna/2017-18
|
Improvement of Road from Hogalpati RHD Kamal Jomaddar Bari Lemua GC Patharghata Jamira Tola sarok Douatola Hogalpati 25 road Langol vanga Sardar Dofadar Bari from Ch. 2000m-5030m under Bamna Upazila District Barguna Road ID- 504192009
|
DIRIP-2
|
bamna
|
504192009
|
3.03
|
|
|
27670523.00
|
M/S Atom Enterprise. Amtalarpar, Barguna
|
29745905.89
|
29/08/2018
|
|
02/06/2019
|
100
|
|
|
18/01/2021
|
|
185
|
DIRIP-II/UZR/BC-02/Barguna/2018-19(229720).
|
Improvement of Kholpatua GC - Douatola GC - Mathbaria RHD Kholpatua GC - Jafrakhali bridge Road from Ch. 1500m - 6147m under Bamna Upazila District Barguna Road ID- 504192005 Salvage amount Tk. 706228.00 [OSTETM]
|
DIRIP-2
|
bamna
|
504192009
|
4.65
|
|
|
517.09
|
M/S Al Mamun Enterprise
|
501.58
|
|
|
|
100
|
|
|
14/07/2020
|
|
186
|
DIRIP-2/VR/BC-09/Barguna/2017-18 (TID-174399)
|
Improvement of Aliyabad GPS-Dafa PS via GPS Road by BC from Ch. 00.00m-5525.00m under Betagi Upazila District Barguna. Road ID-504474093.
|
DIRIP-2
|
betagi
|
504474093
|
5.53
|
|
|
399.74
|
M/S Arif & Asif Construction & Afser & Co(Jv).Sadar Road Barguna.Mob-01712885528
|
397.22
|
21/05/2018
|
21/05/2018
|
28/03/2019
|
100
|
487.93
|
|
31/12/2021
|
|
187
|
DIRIP-II/Barguna/UNRSTR-01/2018-19(221796)
|
Construction of 18.00m long RCC Bridge on Betagi UPC-Hosnabad UPC via Goyal Bari GPS Road at Ch. 4547m under Betagi Upazila District Barguna Road ID-504473004
|
DIRIP-2
|
betagi
|
504473004
|
|
18.00
|
|
142.91
|
M/S Hazi Enterprise Bakerjong,BarishalMob:01715981612
|
135.49
|
04/12/2018
|
04/12/2018
|
27/10/2019
|
100
|
|
|
31/12/2021
|
|
188
|
DIRIP-II/Barguna/UNRSTR-03/2018-19(221798)
|
Construction of 17.00m long RCC Bridge on Betagi UPC - Sabuj kanan- Kadamtala- Jalisha bazar Road at Ch. 5400m under Betagi Upazila District Barguna Road ID-504473022
|
DIRIP-2
|
betagi
|
504473022
|
|
17.00
|
|
154.97
|
M/S Hazi Enterprise Bakerjong,BarishalMob:01715981612
|
146.93
|
03/12/2018
|
03/12/2018
|
11/08/2019
|
100
|
|
|
31/12/2021
|
|
189
|
DIRIP-II/UNR(Str)-05/Barguna/2018-19(231540).
|
Construction of 18m long RCC bridge at Ch. 6428m on Betagi UP-Hosnabad via Goalpar GPS Road under Betagi Upazila District Barguna Road ID-504473004 (Estimated Cost-1,34,75,248.00) [LTM]
|
DIRIP-2
|
betagi
|
504473004
|
|
18.00
|
|
134.75
|
M/S Jhuma Enterprise.
|
128.01
|
|
|
|
100
|
|
|
31/12/2021
|
|
190
|
DIRIP-II/UNR(Str)-06/Barguna/2018-19(231541).
|
Construction of 24m long RCC Bridge at Ch. 3000m on Betagi Kumrakhali Bazar - Mirer Hat via Kazirabad UP office Road under Betagi Upazila, Barguna Road ID- 504473013
|
DIRIP-2
|
betagi
|
504473013
|
|
24.00
|
|
191.16
|
M/S Khan Enterprise
|
181.61
|
|
|
|
100
|
|
|
18/01/2021
|
|
191
|
DIRIP-2/UNR/BC-03/Barguna/2017-18 (TID-174390)
|
Improvement of Fultala WARDA Bazar-Bibichini UP Office-Shantirhat Road Fultala WAPDA Bazar-Bibichini UP Office-Talgasia H/S-Shantir Hat Road Bibichini UP-Shantirhat road by BC from Ch. 00.00m-2500.00m under Betagi Upazila District Barguna. Road ID-5044730
|
DIRIP-2
|
betagi
|
504473020
|
2.50
|
|
|
184.79
|
M/S Khakon Traders,Dakkhin Barguna,Barguna, Mob-01716431543
|
175.55
|
06/05/2018
|
06/05/2018
|
06/01/2019
|
100
|
557.01
|
|
14/07/2020
|
|
192
|
DIRIP-2/VR/BC-08/Barguna/2017-18 (TID-174391) I
|
Improvement of Battala Bazar-Mosarrof Chairman College Road Kazirabad UPCNew-Barguna Betagi RHD Battala road by BC from Ch. 00.00m-1040.00m under Betagi Upazila District Barguna. Road ID-504474039 Salvage 1085289.00.
|
DIRIP-2
|
betagi
|
504474039
|
1.04
|
|
|
79.89
|
M/S Hasan Enterprise,College Road Barguna.Mob-01716682716
|
75.90
|
06/05/2018
|
06/05/2018
|
18/12/2018
|
100
|
|
|
14/07/2020
|
|
193
|
DIRIP-2/UNR/BC-02/Barguna/2017-18 (TID-174398)
|
Improvement of Betagi UPC-Hosnabad via Gowalbari GPS Road by BC from Ch. 1425.00m-6315.00m under Betagi Upazila District Barguna. Road ID-504473004 Salvage 59336.00.
|
DIRIP-2
|
betagi
|
504473004
|
4.89
|
|
|
340.13
|
M/S Khan Enterprise,Betagi pauroshava,Barguna.Mob-01711960560
|
339.00
|
22/05/2018
|
22/05/2018
|
25/03/2019
|
100
|
103.97
|
|
14/07/2020
|
|
194
|
DIRIP-II/Barguna/UNRSTR-02/2018-19(221797)
|
Construction of 20.00m long RCC Bridge on Betagi UPC - Sabuj kanan- Kadamtala- Jalisha bazar Road at Ch. 5800m under Betagi Upazila District Barguna Road ID-504473022
|
DIRIP-2
|
betagi
|
504473022
|
|
20.00
|
|
161.94
|
M/S Khan Enterprise,Betagi pauroshava,Barguna.Mob-01711960560
|
148.99
|
05/12/2018
|
05/12/2018
|
13/10/2019
|
100
|
|
|
14/07/2020
|
|
195
|
DIRIP-II/Barguna/UNRSTR-04/2018-19(221799)
|
Construction of 18.00m long RCC Bridge on Betagi UPC-Hosnabad UPC via Goyal Bari GPS Road at Ch. 2835m under Betagi Upazila District Barguna Road ID-504473004
|
DIRIP-2
|
betagi
|
504473004
|
|
18.00
|
|
156.63
|
M/S Khan Enterprise,Betagi pauroshava,Barguna.Mob-01711960560
|
144.10
|
05/12/2018
|
05/12/2018
|
13/10/2019
|
100
|
|
|
14/07/2020
|
|
196
|
DIRIP-2/VR/BC-07/Barguna/2017-18 (TID-200129)
|
Improvement of Khalifer Hat-Tengra Bazar Road by BC from Ch. 00.00m-3710.00m under Patharghata Upazila District Barguna. Road ID-504855063 Salvage 3124966.00.
|
DIRIP-2
|
patharghata
|
504855063
|
3.71
|
|
|
292.00
|
M/S Atom Enterprise. Amtalarpar, Barguna Mob:01719633865
|
316.82
|
29/08/2018
|
29/08/2018
|
02/07/2019
|
100
|
|
|
31/12/2021
|
|
197
|
DIRIP-2/VR/BC-10/Barguna/2017-18(TID-194448)
|
Improvement of Road from Keramotpur bazar RHD - Fokir Hat Apilar bhorani bridge from Ch. 00m-7600m under Patharghata Upazila District Barguna Road ID-504854023 Salvage amount Tk. 794117.00
|
DIRIP-2
|
patharghata
|
504854023
|
7.60
|
|
|
535.76
|
M/S Hazi Enterprise Bakerjong,BarishalMob:01715981612
|
556.17
|
29/07/2018
|
29/07/2018
|
09/06/2019
|
100
|
|
|
31/12/2021
|
|
198
|
DIRIP-II/VR(Str)-05/Barguna/2018-19(232757).
|
Construction of 22m RCC Bridge on Kazirhat - Jaliaghata Road at Ch. 1000m under Patharghata Upazila District Barguna Road ID- 504854032
|
DIRIP-2
|
patharghata
|
504854032
|
|
22.00
|
|
155.96
|
M/S Tareq Enterprise.
|
148.16
|
06/01/2019
|
06/01/2019
|
14/11/2019
|
100
|
|
|
31/12/2021
|
|
199
|
DIRIP-II/VR(Str)-06/Barguna/2018-19(239606).
|
Construction of 24m RCC Bridge on Nali Bazar Nachnapara Bazar via Uttor Kathaltoli community primary school Road at Ch. 2265m under Patharghata Upazila District Barguna Road ID- 504854050
|
DIRIP-2
|
patharghata
|
504854050
|
|
24.00
|
|
173.85
|
M/S Trinath Karmakar
|
165.15
|
06/01/2019
|
06/01/2019
|
14/12/2019
|
100
|
|
|
31/12/2021
|
|
200
|
DIRIP-2/UNRStr-20/Barguna/ 18-19(278509),
|
Construction of 33m long PSC Bridge on Kathaltala UP R&H - Saptagram - Kathaltala Bazar via Burujpur GPS road at CH 5190 ID NO 504853010 under upazila Patharghata Dist Barguna.
|
DIRIP-2
|
patharghata
|
504853010
|
|
33.00
|
|
339.51
|
|
0.00
|
08/05/2019
|
09/06/2020
|
09/06/2020
|
60
|
|
|
31/12/2021
|
|
201
|
DIRIP-2/UZRStr-04/Barguna/18-19,(278492)
|
Construction of 32m long PSC Bridge on munsigong hat R&H - Nali SHAPLAJA GC via Charduani GC road at CH 7600m ID NO 504852001 under upazila Patharghata Dist Barguna.
|
DIRIP-2
|
patharghata
|
504852001
|
|
32.00
|
|
414.26
|
|
0.00
|
08/05/2019
|
18/08/2020
|
18/08/2020
|
50
|
|
|
31/12/2021
|
|
202
|
DIRIP-II/VR(Str)-05/Barguna/2018-19
|
Construction of 22m RCC Bridge on Kazirhat - Jaliaghata Road at Ch. 1000m
|
DIRIP-2
|
patharghata
|
504854032
|
|
22.00
|
|
156.00
|
M/S Tareq EnterpriseBetagi Pauroshava,Barguna
|
148.15
|
06/01/2019
|
14/11/2019
|
14/11/2019
|
100
|
78.32
|
|
31/12/2021
|
|
203
|
DIRIP-2/UNRStr-13/Barguna/18-19
|
Construction of 36.00m long PSC Bridge on Nachnapara UP RHD-Talukder Charduani Hat via Napiter Kheya Ghat Road at Ch. 4350m
|
DIRIP-2
|
patharghata
|
504853013
|
|
36.00
|
55
|
417.00
|
TN - ASI(JV)
|
357.54
|
06/08/2019
|
18/08/2020
|
18/08/2020
|
55
|
0.00
|
55
|
31/12/2021
|
|
204
|
DIRIP-2/UNR/Str.-23/Barguna/2019-20
|
Construction of 30.00m Long PSC Girder Bridge on Patharghata UPC Padma Bazar Sluice Road at ch. 2400 m
|
DIRIP-2
|
patharghata
|
504853011
|
|
30.00
|
|
240.00
|
M/S Amir Engineering corporetion.
|
222.00
|
07/04/2020
|
06/02/2021
|
06/02/2021
|
85
|
0.00
|
|
31/12/2021
|
|
205
|
DIRIP-2/UZRStr-03/Barguna/18-19
|
Construction of 39.00m Long RCC Girder Bridge on Munsiganj hat R&H - Nali (Shaplaja GC) via Charduani GC Road at ch. 4360m
|
DIRIP-2
|
patharghata
|
504852001
|
|
39.00
|
|
321.00
|
M/S Lyla Builders & Md.Lutful Kabir (JV)
|
269.00
|
24/05/2020
|
11/04/2021
|
11/04/2021
|
85
|
0.00
|
|
31/12/2021
|
|
206
|
DIRIP-2/VR/BC-04/Barguna/2017-18:(TID-174389)
|
Improvement of Badhurtala-Haritana Road by BC from Ch. 00.00m-2257.00m under Patharghata Upazila District Barguna. Road ID-504854012Salvage 376722.00.
|
DIRIP-2
|
patharghata
|
|
2.26
|
|
|
165.23
|
M/S Moumita Traders.Ser-E-Bangla Road,BargunaMob-01716886426
|
156.97
|
07/05/2018
|
07/05/2018
|
14/01/2019
|
100
|
445.66
|
|
14/07/2020
|
|
207
|
DIRIP-2/UNR/BC-01/Barguna/2017-18 (TID-174392)I
|
mprovement of Nachnapara UP Hazi Mozahar Uddin RHD-Katakhali Bazar RHD via Fakir Hat & MKPS Road by BC from Ch. 00.00m-4100.00m under Patharghata Upazila District Barguna. Road ID-504853006 Salvage 261464.00.
|
DIRIP-2
|
patharghata
|
504853006
|
4.10
|
|
|
324.40
|
M/S Al Mamun Enterprise.Local Representative Md Nizam Uddin.Mob-01712742888
|
320.86
|
20/05/2018
|
20/05/2018
|
23/02/2019
|
100
|
249.21
|
|
14/07/2020
|
|
208
|
DIRIP-2/VR/BC-05/Barguna/2017-18 (TID-200128)
|
Improvement of Haritana-Tengra Bazar Road by BC from Ch. 00.00m-3445.00m under Patharghata Upazila District Barguna. Road ID-504854020 Salvage 909376.00.
|
DIRIP-2
|
patharghata
|
504854020
|
3.45
|
|
|
319.30
|
M/S Atom Enterprise. Amtalarpar, Barguna Mob:01719633865
|
349.64
|
29/08/2018
|
29/08/2018
|
02/07/2019
|
100
|
|
|
14/07/2020
|
|
209
|
DIRIP-2/VR/BC-06/Barguna/2017-18 (TID-174395)
|
Improvement of GutabashaR&H-Masherkhal R&H via H/O Kudus Mia Road by BC from Ch. 00.00m-3260.00m under Patharghata Upazila District Barguna. Road ID-504854089 Salvage 5276721.00.
|
DIRIP-2
|
patharghata
|
504854089
|
3.26
|
|
|
248.63
|
M/S Al Mamun Enterprise.Local Representative Md Nizam Uddin.Mob-01712742888
|
259.00
|
20/05/2018
|
20/05/2018
|
24/01/2019
|
100
|
90.96
|
|
14/07/2020
|
|
210
|
DIRIP-2/VR/BC-03/Barguna/2017-18(TID-208016)
|
Improvement of Karamothpur Bus Stand-Kazirhat via H/O Mokbul Road by BC from Ch. 00.00m-3360.00m under Patharghata Upazila District Barguna. Road ID-504854030 Salvage 22286.00.
|
DIRIP-2
|
patharghata
|
504854030
|
3.36
|
|
|
322.66
|
M/S Al Mamun Enterprise.Local Representative Md Nizam Uddin.Mob-01712742888
|
351.56
|
23/09/2018
|
23/09/2018
|
01/10/2019
|
100
|
|
|
14/07/2020
|
|
211
|
GSIDP/BGN/DW-54
|
Improvement of Hazi Abdul Gani Mosque Union: Gulisthakhali[Latitude:22.2291, Longitude:90.2370]
|
GSIDP
|
amtali
|
|
|
|
|
3.33
|
M/S Shaikh Service & Co
|
3.17
|
01/11/2018
|
|
09/02/2019
|
0
|
|
|
03/04/2019
|
|
212
|
GSIDP/BGN/DW-55
|
Improvement of Gulisthakhali Abdul Gani Mosque Attached Eidgha, Union: Gulisthakhali.[Latitude:22.2289, Longitude: 90.2373]
|
GSIDP
|
amtali
|
|
|
|
|
7.64
|
M/S. Mohona Enterprise ,
|
7.26
|
01/11/2018
|
|
09/02/2019
|
0
|
|
|
03/04/2019
|
|
213
|
GSIDP/BGN/DW-61
|
Improvmeent of Talukderbari jame Mosque,Union : Chawra .[ Latitude: 22.1490,Longitude: 90.2359]
|
GSIDP
|
amtali
|
|
|
|
|
5.00
|
M/S. Mridha Enterprise
|
4.75
|
14/02/2019
|
|
22/01/2019
|
10
|
|
|
03/04/2019
|
|
214
|
GSIDP/BGN/DW-62
|
Improvement of Sree Sree Hory Guru chad Baktoseba Asrom Mondir,Union: Chawra [ Latitude: 22.1554,Longitude: 90.2478]
|
GSIDP
|
amtali
|
|
|
|
|
5.00
|
Mst.Jahanara Isalam.
|
4.75
|
25/02/2019
|
|
05/05/2019
|
10
|
|
|
03/04/2019
|
|
215
|
GSIDP/BGN/DW-71
|
Improvement of Gulisthakhali Bazar Jame-E-Mosque,Union : Gulisthakhali .[ Latitude: 22.2218,Longitude: 90.2314]
|
GSIDP
|
amtali
|
|
|
|
|
5.00
|
|
0.00
|
|
|
|
0
|
|
|
03/04/2019
|
|
216
|
GSIDP/BGN/DW-72
|
Improvement of Jame-E-Mosque Infront H/O Badsha Mridha,Union : Amtali.[ Latitude: 22.1152,Longitude: 90.2372]
|
GSIDP
|
amtali
|
|
|
|
|
11.59
|
|
0.00
|
|
|
|
0
|
|
|
03/04/2019
|
|
217
|
GSIDP/BGN/DW-52
|
Improvement of Gulisthakhali Bazar Attached Shree Shree Radha Gobindo Kali Mondir, Union: Gulisthakhali.[Latitude: 22.3722, Longitude:90.3911]
|
GSIDP
|
amtali
|
|
|
|
|
5.37
|
M/S. Humayra Construction
|
5.10
|
01/11/2018
|
|
05/02/2019
|
100
|
|
|
02/04/2019
|
|
218
|
GSIDP/BGN/DW-53
|
Improvement of PurboKukua Shree Shree Hori DurgaShebashram, Union: Kukua.[Latitude: 22.3165, Longitude:90.531]
|
GSIDP
|
amtali
|
|
|
|
|
6.00
|
M/S. Sohel Traders
|
5.70
|
01/11/2018
|
|
04/02/2019
|
100
|
|
|
02/04/2019
|
|
219
|
GSIDP/BGN/DW-12
|
Improvement of Dakhin Kholpatua Late Abdul Hoque Howldar House Union:Ramna[Latitude:22.4333, Longitude: 90.11866.]
|
GSIDP
|
bamna
|
|
|
|
|
5.83
|
Md Golam Sarower
|
5.54
|
13/06/2018
|
|
03/05/2019
|
100
|
|
|
03/04/2019
|
|
220
|
GSIDP/BGN/DW-8
|
Improvement of Baitul Aman Jame Mosque at Chootto Jadoppura Union: Bukabunia[Latitude:22.5303, Longitude: 90.1121.]
|
GSIDP
|
bamna
|
|
|
|
|
5.83
|
M/S K.K Traders
|
5.08
|
|
20/06/2018
|
21/08/2018
|
100
|
|
|
|
|
221
|
GSIDP/BGN/DW-9
|
Improvement of Ruhita Bazar Jame Mosque Union: Bamna Sadar[Latitude:22.476, Longitude: 90.1345.]
|
GSIDP
|
bamna
|
|
|
|
|
5.83
|
M/S R.S Business Center
|
5.54
|
|
20/06/2018
|
20/08/2018
|
100
|
|
|
|
|
222
|
GSIDP/BGN/DW-10
|
Improvement of Parchim Safipur Jame Mosque (Chowdhary Bari) Union: Bamna Sadar[Latitude:22.5275, Longitude: 90.145.]
|
GSIDP
|
bamna
|
|
|
|
|
5.34
|
M/S K.K Traders
|
5.08
|
|
10/06/2018
|
11/10/2018
|
100
|
|
|
|
|
223
|
GSIDP/BGN/DW-11
|
Improvement of Durgha Mondir At Amtoli Ramesh Baparys House Union: Bamna Sadar[Latitude:22.5263, Longitude: 90.1101.]
|
GSIDP
|
bamna
|
|
|
|
|
5.00
|
M/S Shithil Enterprise
|
4.75
|
|
20/06/2018
|
21/08/2018
|
100
|
|
|
|
|
224
|
GSIDP/BGN/DW-13
|
Improvement of Maleque Jomadder Houses Jame Mosque Union: Ramna[Latitude:22.43336, Longitude: 90.12.]
|
GSIDP
|
bamna
|
|
|
|
|
5.00
|
M/S Shaikh Service & Co
|
4.75
|
|
20/06/2018
|
28/08/2018
|
100
|
|
|
|
|
225
|
GSIDP/BGN/DW-14
|
Improvement of Uttar Gudighata Baikalin Bazar Jamae Mosque Union: Dawatala [Latitude:22.3767, Longitude: 90.0502.]
|
GSIDP
|
bamna
|
|
|
|
|
5.00
|
M/S Al Mamun Enterprise
|
4.75
|
|
20/06/2018
|
20/08/2018
|
100
|
|
|
|
|
226
|
GSIDP/BGN/DW-15
|
Improvement of Jame Mosque at Dakhin Bhaijora Nasar Mirdha House Union: Ramna [Latitude:22.369, Longitude: 90.14616.]
|
GSIDP
|
bamna
|
|
|
|
|
5.83
|
M/S Akon Traders
|
4.75
|
|
20/06/2018
|
20/08/2018
|
60
|
|
|
|
|
227
|
GSIDP/BGN/SDW-59
|
Improvement of 01 No Ward Bashbunia Village Badsabari Common Graveyard,Union: 08 no Barguna .[ Latitude: 22.133,Longitude;90.1242.]
|
GSIDP
|
barguna-s
|
|
|
|
|
5.30
|
M/S Azad Traders
|
5.04
|
17/01/2019
|
|
18/03/2019
|
100
|
|
|
03/04/2019
|
|
228
|
GSIDP/BGN/SDW-63
|
Improvement of Parirkhal Chaiman Bari Jame Mosque,Union: M Baliatali .[ latitude: 22.0435,Longitude: 90.0542]
|
GSIDP
|
barguna-s
|
|
|
|
|
7.53
|
M/S Sumi & Brothers
|
7.15
|
18/03/2019
|
|
25/06/2019
|
0
|
|
|
03/04/2019
|
|
229
|
GSIDP/BGN/SDW-64
|
Improvment of Parirkhal Bazar Bus Stand Darus Sunnat Jame Mosque,Union :M Baliatali.[Latitude: 22.0435,Longitude:90.0542.]
|
GSIDP
|
barguna-s
|
|
|
|
|
5.00
|
M/S Sumi & Brothers
|
4.75
|
24/03/2019
|
|
01/06/2019
|
0
|
|
|
03/04/2019
|
|
230
|
GSIDP/BGN/SDW-66
|
Improvement of Karaitala Biswas Bari Jam-E-Mosque,Union : Barguna Pourashava.[ Latitude: 22.1500,Longitude: 90.1393]
|
GSIDP
|
barguna-s
|
|
|
|
|
5.00
|
|
0.00
|
|
|
|
0
|
|
|
03/04/2019
|
|
231
|
GSIDP/BGN/SDW-67
|
Improvement of Patakata Meher Ali Houlader Bari Jame-E-Mosque,Union : Baliatili [ Latitude: 21.9939,Longitude: 90.0372]
|
GSIDP
|
barguna-s
|
|
|
|
|
5.00
|
|
0.00
|
|
|
|
0
|
|
|
03/04/2019
|
|
232
|
GSIDP/BGN/SDW-68
|
Improvement of Graveyerd No Parirkhal AL-Haz Rustum Ali,Union : 9no M. Baliatoly,Latitude:22.0435,Longitude: 90.0568]
|
GSIDP
|
barguna-s
|
|
|
|
|
3.17
|
|
0.00
|
|
|
|
0
|
|
|
03/04/2019
|
|
233
|
GSIDP/BGN/DW-1
|
Improvement of Improvement of Late Asaduzzaman Khan house Jame Mosque at Nishanbaria village under Nishanbaria Union. [Latitude:22.036155, Longitude: 90.008388.]
|
GSIDP
|
barguna-s
|
|
|
|
|
5.00
|
M/S. Rajia Construction
|
4.75
|
03/05/2018
|
|
12/09/2018
|
100
|
|
|
02/04/2019
|
|
234
|
GSIDP/BGN/DW-16
|
GSIDP/BGN/DW-16 Improvement of Upazila parishad Jame Mosque Union: Barguna Pourashava[Latitude:22.1583, Longitude: 90.1099.]
|
GSIDP
|
barguna-s
|
|
|
|
|
5.00
|
M/S Hanif Costruction
|
4.75
|
|
|
|
100
|
|
|
02/04/2019
|
|
235
|
GSIDP/BGN/DW-17
|
Improvement of Kalibari Sarbojanin Durga mondir Union: Barguna Pourashava[Latitude:22.1556, Longitude: 90.1323.]
|
GSIDP
|
barguna-s
|
|
|
|
|
5.00
|
M/S Shaikh Service & Co
|
4.75
|
04/07/2018
|
|
09/10/2018
|
100
|
|
|
02/04/2019
|
|
236
|
GSIDP/BGN/DW-21
|
Improvement of Barguna Shahid Sriti Sarak Gono Koborsthan Union: Barguna Pourashava[Latitude:22.1527, Longitude: 90.1275.]
|
GSIDP
|
barguna-s
|
|
|
|
|
19.65
|
M/S Mahi Enterprise
|
18.67
|
04/07/2018
|
|
12/10/2018
|
100
|
|
|
02/04/2019
|
|
237
|
GSIDP/BGN/DW-22
|
Improvement of Shasanghat Chulli & Dahoghar Adjacent Barguna Shahid Sriti Sarak Union: Barguna Pourashava[Latitude:22.1525, Longitude: 90.1267.]
|
GSIDP
|
barguna-s
|
|
|
|
|
11.18
|
M/S Sumi & Brothers
|
10.62
|
|
|
|
100
|
|
|
02/04/2019
|
|
238
|
GSIDP/BGN/SDW-40
|
Improvement of Keorabunia Badamtala (Dawatala) Baitul Mamur Jam-E- Mosque, Union: Burirchar , Latitude: 22.1711 , Longitude: 90.1684.
|
GSIDP
|
barguna-s
|
|
|
|
|
24.08
|
M/S Azad Traders
|
22.88
|
29/07/2018
|
|
05/11/2018
|
100
|
|
|
02/04/2019
|
|
239
|
GSIDP/BGN/DW-58
|
GSIDP/BGN/DW-58 Improvement of No Waed Bashbunia village Badsabari Jame Mosque,Union : 08 No Barguna.[Latitude: 22.133,Longitude: 90.1242]
|
GSIDP
|
barguna-s
|
|
|
|
|
7.26
|
M/S Othoi Enterprise
|
6.90
|
17/01/2019
|
|
21/03/2019
|
100
|
|
|
02/04/2019
|
|
240
|
GSIDP/BGN/DW-2
|
Improvement of Potkakhali Grave Yard Under Dhalua Union.[Latitude:22.159568, Longitude:90.804400]
|
GSIDP
|
barguna-s
|
|
|
|
|
5.00
|
M/S. Sermin Construction
|
4.75
|
|
24/05/2018
|
24/09/2018
|
100
|
|
|
|
|
241
|
GSIDP/BGN/DW-3
|
Improvement of Potkakhali (Burning Ground) Shashan Under Dhalua Union.[Latitude:22.158780, Longitude:90.087078.]
|
GSIDP
|
barguna-s
|
|
|
|
|
5.00
|
M/S, Musolli Construction
|
4.75
|
|
24/05/2018
|
24/09/2018
|
100
|
|
|
|
|
242
|
GSIDP/BGN/DW-4
|
Improvement of Uttar Dema Arshed Gazi Bari Jame Mosque Under Badarkhali Union. [Latitude:22.1820, Longitude: 90.0605.]
|
GSIDP
|
barguna-s
|
|
|
|
|
5.00
|
M/S. Prapti and Somapti Enterprise
|
4.75
|
|
07/05/2018
|
07/07/2018
|
100
|
|
|
|
|
243
|
GSIDP/BGN/DW-5
|
Improvement of Maddya Gudhighata Jame Mosque Under Fuljhuri Union.[Latitude:22.2093, Longitude: 90.1526.]
|
GSIDP
|
barguna-s
|
|
|
|
|
5.00
|
M/S. Mim Construction
|
4.75
|
|
07/05/2018
|
07/07/2018
|
100
|
|
|
|
|
244
|
GSIDP/BGN/DW-6
|
Improvement of Md. Siddiqur Rahman Chairman bari Jame Mosque Under Burirchar Union.[Latitude:22.1427, Longitude: 90.1350.]
|
GSIDP
|
barguna-s
|
|
|
|
|
5.00
|
Md Golam Sarower
|
4.75
|
|
24/05/2018
|
25/07/2018
|
100
|
|
|
|
|
245
|
GSIDP/BGN/DW-7
|
Improvement of Garjanbunia School & College adjacent Jame Mosque under Nishanbaria Union.[Latitude:22.035397, Longitude: 90.024950.]
|
GSIDP
|
barguna-s
|
|
|
|
|
5.00
|
M/S. Mohona Enterprise ,
|
4.75
|
|
20/05/2018
|
20/09/2018
|
100
|
|
|
|
|
246
|
GSIDP/BGN/DW-33
|
Improvement of Badnikhali Jame Mosque, Union: Buramazumder.[Latitude: 23.298372, Longitude: 90.120030]
|
GSIDP
|
betagi
|
|
|
|
|
4.00
|
M/S Matri Enterprise
|
3.80
|
08/07/2018
|
|
16/11/2018
|
75
|
|
|
04/04/2019
|
|
247
|
GSI DP/BGN/DW-34
|
Improvement of Kazirhat Jame Mosque, Union: Buramazumder.[Latitude: 22.333887, Longitude: 90.137855]
|
GSIDP
|
betagi
|
|
|
|
|
3.00
|
M/S Subarna Enterprise
|
2.85
|
08/07/2018
|
|
16/09/2018
|
100
|
|
|
04/04/2019
|
|
248
|
GSIDP/BGN/DW-38
|
Improvement of Jannatul Baki Graveyard, Union: Kazirabad.[Latitude: 22.266078, Longitude: 90.142250]
|
GSIDP
|
betagi
|
|
|
|
|
3.00
|
M/S Tareque Enterprise
|
2.85
|
08/07/2018
|
|
16/11/2018
|
100
|
|
|
04/04/2019
|
|
249
|
GSIDP/BGN/SDW-60
|
Improvement of Gread Laxmipura Rahmatpur Madrasha Jame Mosque,Union : Betagi .[Latitude: 22.421752,Longitude: 90.214590.]
|
GSIDP
|
betagi
|
|
|
|
|
7.62
|
M/S Matri Enterprise
|
7.24
|
03/02/2019
|
|
11/01/2019
|
30
|
|
|
04/04/2019
|
|
250
|
GSIDP/BGN/SDW-69
|
Improvement of Bitun Nur Jame Mosque,Union : Bibichini.[ Latitude: 22.45880,Longitude: 90.21848]
|
GSIDP
|
betagi
|
|
|
|
|
5.00
|
|
0.00
|
|
|
|
0
|
|
|
04/04/2019
|
|
251
|
GSIDP/BGN/SDW-70
|
Improvement of South Sopkhali Sarder Bari Durga Mondir& Saba asrom,Union : Hosnabad.[ Latitude: 22.33543,Longitude: 90.1504]
|
GSIDP
|
betagi
|
|
|
|
|
5.01
|
|
0.00
|
|
|
|
0
|
|
|
04/04/2019
|
|
252
|
GSIDP/BGN/SDW-73
|
Improvement of Grade Laxmipur Village Khalifabari Jame Mosque, Union: Betagi Sadar.[Latitude: 22.428742, Longitude: 90.208605.]
|
GSIDP
|
betagi
|
|
|
|
|
3.04
|
|
0.00
|
|
|
|
0
|
|
|
04/04/2019
|
|
253
|
GSIDP/BGN/DW-23
|
Improvement of Kadomtala Central Mosjid & Eidgha near The Md. Jalil khan house, Union: Hosnabad [Latitude:22.3543, Longitude: 90.1924]
|
GSIDP
|
betagi
|
|
|
|
|
3.00
|
M/S Othoi Enterprise
|
2.85
|
08/07/2018
|
|
16/09/2018
|
100
|
|
|
03/04/2019
|
|
254
|
GSIDP/BGN/DW-25
|
Improvement of Jalisha bazer Central Mosjid, Union: Hosnabad.[Latitude:22.3697, Longitude: 90.1315
|
GSIDP
|
betagi
|
|
|
|
|
4.00
|
M/S Tareque Enterprise
|
3.80
|
08/07/2018
|
|
26/11/2018
|
100
|
|
|
03/04/2019
|
|
255
|
GSIDP/BGN/DW-26
|
Improvement Edgha Field near Talgasia High School, Union, Hosnabad,[Latitude:22.4475, Longitude: 90.2047]
|
GSIDP
|
betagi
|
|
|
|
|
4.00
|
M/S Othoi Enterprise
|
4.80
|
08/07/2018
|
|
12/11/2018
|
100
|
|
|
03/04/2019
|
|
256
|
GSIDP/BGN/DW-27
|
Improvement of putiakhali purbo para Sarbojonin Durgah Mondir, Union: Bibicini[Latitude:22.4557, Longitude: 90.1792]
|
GSIDP
|
betagi
|
|
|
|
|
3.00
|
M/S Othoi Enterprise
|
2.85
|
08/07/2018
|
|
16/09/2018
|
100
|
|
|
03/04/2019
|
|
257
|
GSIDP/BGN/DW-29
|
Improvement of Kathaltoli Madrasha Masjid, Union: Mokamia[Latitude:22.3217, Longitude: 90.1088]
|
GSIDP
|
betagi
|
|
|
|
|
4.00
|
M/S Othoi Enterprise
|
3.80
|
08/07/2018
|
|
12/10/2018
|
100
|
|
|
03/04/2019
|
|
258
|
GSIDP/BGN/DW-30
|
Improvement of Mokamia Sarbojonin Obhodut Mondir, Union Mokamia [Latitude:22.3697, Longitude: 90.1333]
|
GSIDP
|
betagi
|
|
|
|
|
3.00
|
M/S Othoi Enterprise
|
2.85
|
08/07/2018
|
|
16/09/2018
|
100
|
|
|
03/04/2019
|
|
259
|
GSIDP/BGN/DW-37
|
Improvement of Howlader bari Baitul Aman Jame Mosque, Union: Kazirabad.[Latitude: 22.265325, Longitude: 90.149872]
|
GSIDP
|
betagi
|
|
|
|
|
3.00
|
M/S Matri Enterprise
|
2.85
|
08/07/2018
|
|
10/10/2018
|
100
|
|
|
03/04/2019
|
|
260
|
GSIDP/BGN/DW-24
|
Improvement of Abdul bari Howlader house near The Mosjid & Eidgha, Union: [Latitude:22.3543, Longitude: 90.1924
|
GSIDP
|
betagi
|
|
|
|
|
3.00
|
M/S Subarna Enterprise
|
2.85
|
08/07/2018
|
|
18/09/2018
|
100
|
|
|
03/04/2019
|
|
261
|
GSIDP/BGN/DW-28
|
Improvement of DC hat Masjid, Union: Bibicini[Latitude:22.4705, Longitude: 90.2164]
|
GSIDP
|
betagi
|
|
|
|
|
3.00
|
M/S Matri Enterprise
|
2.85
|
08/07/2018
|
|
16/09/2018
|
100
|
|
|
03/04/2019
|
|
262
|
GSIDP/BGN/DW-32
|
Improvement of Palkanda Gafur Sikder bari Jame Mosque, Union: Batagi Sadar.[Latitude: 22.402095, Longitude: 90.157382]
|
GSIDP
|
betagi
|
|
|
|
|
3.02
|
M/S Othoi Enterprise
|
2.85
|
08/06/2018
|
|
16/10/2018
|
100
|
|
|
03/04/2019
|
|
263
|
GSIDP/BGN/DW-35
|
Improvement of Badnikhali Durga Mondir Paschim Buramajumder Paik bari Loknath Mondir, Union: Buramazumder[Latitude: 22.322007, Longitude: 90.109923]
|
GSIDP
|
betagi
|
|
|
|
|
3.00
|
M/S Subarna Enterprise
|
2.85
|
08/07/2018
|
|
16/09/2018
|
100
|
|
|
03/04/2019
|
|
264
|
GSIDP/BGN/DW-39
|
Improvement of Kalikabari Sarbojonin Durga Mondir, Union:Sharisamuri.[Latitude: 22.281605, Longitude: 90.116165]
|
GSIDP
|
betagi
|
|
|
|
|
3.00
|
M/S Subarna Enterprise
|
2.85
|
08/07/2018
|
|
13/09/2018
|
100
|
|
|
03/04/2019
|
|
265
|
GSIDP/BGN/DW-44
|
Improvement of 09no Singrabunia GPS Jame Mosque, Union:Nachnapara [Latitude:22.150725, Longitude: 89.949016]
|
GSIDP
|
patharghata
|
|
|
|
|
3.50
|
M/S. Sohel Traders
|
3.33
|
03/09/2018
|
|
11/01/2019
|
20
|
|
|
04/04/2019
|
|
266
|
GSIDP/BGN/DW-18
|
Improvement of Gono Kobor Union: Rayhanpur [Latitude:22.183599, Longitude: 89.994025.]
|
GSIDP
|
patharghata
|
|
|
|
|
14.59
|
M/S Sermin Construction
|
13.86
|
04/07/2018
|
|
30/10/2018
|
100
|
|
|
03/04/2019
|
|
267
|
GSIDP/BGN/DW-19
|
Improvement of Kathalia Union parishad Jame Mosque Union: Kathalia[Latitude:22.092666, Longitude: 89.961892.]
|
GSIDP
|
patharghata
|
|
|
|
|
26.14
|
M/S Anwar Hossain
|
24.84
|
04/07/2018
|
|
12/11/2018
|
100
|
|
|
03/04/2019
|
|
268
|
GSIDP/BGN/DW-20
|
Improvement of Patharghata Gobindo Mondir Union: Patharghata pourashava[Latitude:22.044530, Longitude: 89.972124.]
|
GSIDP
|
patharghata
|
|
|
|
|
9.69
|
M/S. Jayeda Enterprise
|
9.20
|
03/09/2018
|
|
03/04/2018
|
100
|
|
|
03/04/2019
|
|
269
|
GSIDP/BGN/DW-41
|
Improvement of Kamarerhat Jame Mosque, Union: Kathaltali [Latitude:22.124607, Longitude: 90.000383]
|
GSIDP
|
patharghata
|
|
|
|
|
4.00
|
M/S Jami Enterprise
|
3.80
|
03/09/2018
|
|
02/07/2019
|
100
|
|
|
03/04/2019
|
|
270
|
GSIDP/BGN/DW-42
|
Improvement of Kanchurhat Jame Mosjid, Union: Kalmegha.[Latitude:22.083874, Longitude: 89.99265]
|
GSIDP
|
patharghata
|
|
|
|
|
4.00
|
M/S Jami Enterprise
|
3.80
|
03/09/2018
|
|
03/04/2019
|
100
|
|
|
03/04/2019
|
|
271
|
GSIDP/BGN/DW-43
|
Improvement of Badurtala Hat Jame Mosque, Union: Patharghata sadar [Latitude:22.011992, Longitude: 89.964855]
|
GSIDP
|
patharghata
|
|
|
|
|
4.50
|
M/S. Khan Traders
|
4.28
|
10/10/2018
|
|
18/01/2019
|
100
|
|
|
03/04/2019
|
|
272
|
GSIDP/BGN/DW-45
|
Improvement of Khalufarhat Montazia Jame Mosque, Union: Charduani [Latitude:22.070536, Longitude: 89.917352]
|
GSIDP
|
patharghata
|
|
|
|
|
4.00
|
M/S. Khan Traders
|
3.80
|
10/10/2018
|
|
18/01/2019
|
100
|
|
|
03/04/2019
|
|
273
|
GSIDP/BGN/DW-48
|
Improvement of Charpara Sarbajonin Durga Mondir, Union: Chotobogi.[Latitude:22.0200, Longitude: 90.0881.]
|
GSIDP
|
Taltali
|
|
|
|
|
5.04
|
Mst.Jahanara Isalam. 01 Nov 2018
|
4.78
|
01/11/2018
|
|
10/02/2019
|
100
|
|
|
03/04/2019
|
|
274
|
GSIDP/BGN/DW-46
|
Improvement of Karaibaria Bazar Jamey Mosque, Union:Koaibaria.[Latitude: 22.0199, Longitude: 90.1596.]
|
GSIDP
|
Taltali
|
|
|
|
|
5.03
|
Mst,Jahanara Isalam,
|
4.78
|
01/11/2018
|
|
10/02/2019
|
40
|
|
|
03/04/2019
|
|
275
|
GSIDP/BGN/DW-49
|
Improvement of Behala Nath Para Sarbojonin Manasha Mondir, Union: Karibaria[Latitude: 22.004, Longitude: 90.1586.]
|
GSIDP
|
Taltali
|
|
|
|
|
5.06
|
M/S Hanif Costruction
|
4.80
|
01/11/2018
|
|
10/02/2019
|
80
|
|
|
03/04/2019
|
|
276
|
GSIDP/BGN/DW-50
|
Improvement of Fokir Hat Bazar Jamey Mosque, Union: Sonakata.[Latitude: 21.8974, Longitude: 90.0349]
|
GSIDP
|
Taltali
|
|
|
|
|
5.03
|
M/S Anwar Hossain
|
4.78
|
24/09/2018
|
|
12/12/2018
|
100
|
|
|
03/04/2019
|
|
277
|
GSIDP/BGN/DW-47
|
Improvement of Taltali Kalibari SarbajoninManashaMandir, Union: Barobogi.[Latitude:21.9805, Longitude: 90.0846.]
|
GSIDP
|
Taltali
|
|
|
|
|
5.04
|
Mst.Jahanara Isalam.
|
4.78
|
01/11/2018
|
|
10/02/2019
|
100
|
|
|
02/04/2019
|
|
278
|
GSIDP/BGN/DW-51
|
Improvement of Jamey Mosque Infront of H/O Jamal Master Vill: Kachupatra, Union: Panchakorila.[Latitude: 22.0659, Longitude: 90.1475.]
|
GSIDP
|
Taltali
|
|
|
|
|
5.00
|
Gazi Mozammel Haque
|
4.75
|
24/10/2018
|
|
03/04/2019
|
100
|
|
|
02/04/2019
|
|
279
|
IBRP/Bar/Amtoli/Brg-02
|
Construction of 37.00m Long RCC Girder Bridge over Tafalbari Khal branch on Atharogchia Up-Bauria Sluice via North Sonakhali GPS & Julakher Bazar & East Sonakhali GPS road.at ch 4400m
|
IBRP
|
amtali
|
504093024
|
|
37.00
|
30
|
355.52
|
Abul Kalam Azad.Azad Mansion Muslimpara
|
337.32
|
16/07/2019
|
02/08/2019
|
31/10/2020
|
30
|
100.00
|
30
|
13/07/2020
|
|
280
|
IBRP/Bar/Amtoli/Brg-03
|
Construction of 48.00m Long RCC Girder Bridge over gazipur Khal on Gazipur GC-Kukua hat(sahid Sohorawardi High School) road.at ch 522m
|
IBRP
|
amtali
|
504473001
|
|
48.00
|
0
|
480.63
|
Abul Kalam Azad.Azad Mansion Muslimpara,
|
423.79
|
16/07/2019
|
02/08/2019
|
26/09/2020
|
0
|
0.00
|
0
|
13/07/2020
|
|
281
|
IBRP/Bar/Bam/main/Brg-01
|
Maintenance of 18.00m Bridge on Goapkhali GPS -Amtoli GPS via karim Maolana House at ch.2100.00m.
|
IBRP
|
bamna
|
504194027
|
|
18.00
|
100
|
30.37
|
M/S. FK Enterprize
|
28.85
|
01/04/2019
|
15/04/2019
|
09/10/2019
|
100
|
28.84
|
100
|
13/07/2020
|
|
282
|
IBRP/Bar/Amtoli/Brg-01
|
Construction of 72.00m Long RCC Girder Bridge over Tafalbari Khal on Atharogachia UP - Gazipur GC road Via Budhbarar Bazar road at Ch 2540m
|
IBRP
|
bamna
|
504093030
|
|
72.00
|
0
|
685.70
|
TN-ASI (JV) Kapuria Patty
|
601.42
|
06/01/2020
|
20/01/2020
|
13/01/2021
|
0
|
0.00
|
0
|
13/07/2020
|
|
283
|
IBRP/Bar/Path/Brg-01
|
Construction of 50m Long R.C.C Girder Bridge on Machayer Khal Patharghata at Ch.15.00m
|
IBRP
|
patharghata
|
504854088
|
|
50.00
|
0
|
507.11
|
M/S Kohinur Enterprise
|
480.24
|
08/05/2019
|
22/05/2019
|
15/05/2020
|
2
|
0.00
|
0
|
13/07/2020
|
|
284
|
IRIDP-2/BGN/DW-75
|
(a) Improvement of Munshir hat (Garabunia GPS - Utter Garabunia H/O Kalam Molla Via Chalitabunia & Utter Garabunia GPS [ Atharogachia Union Parasad Calitabunia Golamail Hazir House – 37 no Uttar Calitabunia GPS - Utter Garabunia GPS - Munsir hat road] (Ch.00m - 1000m.) ID NO. 504095317(b) Construction of 03nos 0.625mx0.900m culvert at ch.620m,670m,940m on the same road.
|
IRIDP-2
|
amtali
|
504095317
|
1.00
|
|
|
61.19
|
M/S. Parul And Sons
|
58.13
|
|
|
|
0
|
|
|
06/05/2019
|
|
285
|
IRIDP-2/BGN/DW-63
|
Improvement of Aoule nagor-H/O Asoke Ali Molla via H/O Hanif Fakir road.(Ch.00m - 600m.) ID NO. 504095334
|
IRIDP-2
|
amtali
|
504095334
|
0.60
|
|
|
41.57
|
M/S Rudra Enterprise
|
41.33
|
27/02/2018
|
|
06/10/2018
|
100
|
|
|
05/05/2019
|
|
286
|
IRIDP-2/BGN/DW-10
|
Improvement of Locha Battala Sluice gate-Amtali Taltali UZR road (Ch. 2400m-3554m)
|
IRIDP-2
|
amtali
|
504094077
|
1.15
|
|
|
63.50
|
M/S Afser & Co
|
58.42
|
28/02/2016
|
|
30/06/2017
|
100
|
|
|
30/04/2019
|
|
287
|
IRIDP-2/BGN/DW-11
|
(a)Improvement of Kawnia BC- Loda Khalgora Iron Bridge Via Kawnia High School&GPS & Chalavanga GPS(Chalavanga culvert – Loda khal gora) road ( Ch.700m-1513m) (b) Construction of 01no 0.625mx0.90m culvert at ch.1360m on the same road.
|
IRIDP-2
|
amtali
|
504095019
|
0.81
|
|
|
47.93
|
M/S Masum Billah Enterprise
|
40.54
|
28/02/2016
|
|
13/02/2017
|
100
|
|
|
30/04/2019
|
|
288
|
IRIDP-2/BGN/DW-17
|
(a) Improvement of Khekuani Bazar- Haridrabaria DKS Dhakile Madrasha via Gulishakhali Bazar&Abdul Gini Dhakile Madrasha road ( Ch.2400m-3400m) (b) Construction of 01no 1.60mx1.60m culvert at ch.3150m on the same road.
|
IRIDP-2
|
amtali
|
504094054
|
1.00
|
|
|
57.64
|
M/S Md.Delwar Hossain
|
47.12
|
29/03/2016
|
|
23/01/2017
|
100
|
|
|
30/04/2019
|
|
289
|
IRIDP-2/BGN/SDW-20
|
Improvement of Atharogchia Up-Bauria Sluice road via Dakkhin Sonakhali GPS & Julakher Bazar & East Sonakhali GPS.Road(Ch.4450m-6000m.)
|
IRIDP-2
|
amtali
|
504093024
|
1.55
|
|
|
88.77
|
Md. Nizamuddin
|
76.27
|
04/10/2016
|
|
20/05/2018
|
100
|
|
|
30/04/2019
|
|
290
|
IRIDP-2/BGN/DW-28
|
Improvement of Locha Battala Sluice gate - Amtali Taltali UZR road.(Ch.4554m - 4984m.)
|
IRIDP-2
|
amtali
|
504094077
|
0.43
|
|
|
23.93
|
Md. Nizamuddin
|
19.73
|
24/11/2016
|
|
24/10/2017
|
100
|
|
|
30/04/2019
|
|
291
|
IRIDP-2/BGN/DW-29
|
(a)Improvement of Kawnia BC - Loda Khalgora Iron Bridge Via Kawnia High School&GPS & Chalavanga GPS(Chalavanga culvert – Loda khal gora) road ( Ch.1513m-2248m)(b) Construction of 02nos 0.625mx0.90m culvert at ch.1950m & 2230m on the same road.
|
IRIDP-2
|
amtali
|
504095019
|
0.74
|
|
|
42.60
|
M/S. Deip Enterprise
|
38.67
|
24/11/2016
|
|
15/02/2018
|
100
|
|
|
30/04/2019
|
|
292
|
IRIDP-2/BGN/DW-30
|
(a)Improvement of Sener hat-Biswaser hat road.(Ch.00m - 1000m.)(b) Construction of 01nos 4.0mx4.0m culvert at ch.968m on the same road.(c) Construction of 02nos 0.625mx0.90m culvert at ch.200m&450m on the same road.
|
IRIDP-2
|
amtali
|
504094016
|
1.00
|
|
|
70.63
|
Md. Sahidul Islam
|
61.10
|
24/11/2016
|
|
07/12/2016
|
100
|
|
|
30/04/2019
|
|
293
|
IRIDP-2/BGN/DW-31
|
(a)Improvement of Gulishakhali UP-Kalagachia Bazar via Fakirkhali GPS.road.(Ch.1750m - 2750m.)(b) Construction of 01nos 4.0mx4.0m culvert at ch.2560m on the same road.(c) Construction of 02nos 0.625mx0.90m culvert at ch.1960m&2350m on the same road.
|
IRIDP-2
|
amtali
|
504093019
|
1.00
|
|
|
72.22
|
M/S. Kamal Enterprise
|
61.02
|
24/11/2016
|
|
13/05/2018
|
100
|
|
|
30/04/2019
|
|
294
|
IRIDP-2/BGN/DW-32
|
(a)Improvement of Dulpukuria bridge-H/o Awalad Advocate.road ( Ch.00m-600m)(b) Construction of 01nos 0.625mx0.90m culvert at ch.365m on the same road.
|
IRIDP-2
|
amtali
|
504094029
|
0.60
|
|
|
39.74
|
Md. Sahidul Islam
|
34.38
|
24/11/2016
|
|
07/06/2017
|
100
|
|
|
30/04/2019
|
|
295
|
IRIDP-2/BGN/DW-33
|
(a)Improvement of Khekuani Bazar-Haridrabaria DKS Dhakile Madrasha via Gulishakhali Bazar&Abdul Gini Dhakile Madrasha. road( Ch.1897m-2400m)(b) Construction of 01nos 0.625mx0.90m culvert at ch.2210m on the same road.
|
IRIDP-2
|
amtali
|
504094054
|
0.50
|
|
|
28.97
|
M/S, Musolli Construction
|
24.04
|
24/11/2016
|
|
20/11/2017
|
100
|
|
|
30/04/2019
|
|
296
|
IRIDP-2/BGN/SDW-71
|
(a)Improvement of Ramna bridge at Soiyod doctor house to Altaf mashter house road [Ramna Ser E Bangla Secondary School infront of bridge west side main road to sattar Dr.madrasha – Golaghata karaitala bhitulla jam e mosque Dawatala karaitala GPS – Anower khan jame mosque road] (Ch.00m - 1443m.) ID NO. 504194114(b) Construction of 01nos 1.50mx1.50m culvert at ch.675m on the same road.(c) Construction of 02nos 0.625mxm culvert at ch.950m,1080m on the same road.
|
IRIDP-2
|
bamna
|
504194114
|
1.44
|
|
|
111.88
|
Md. Golam Sarower
|
106.28
|
31/01/2019
|
|
08/06/2019
|
10
|
|
|
13/05/2019
|
|
297
|
IRIDP-2/BGN/DW-40
|
(a)Improvement of Bamna UP – Sonakhali Bazar via Hanif house road ( Ch.1000m-2200m)(b) Construction of 02nos 1.60mx1.60m culvert at ch.1350m & 1760m on the same road.
|
IRIDP-2
|
bamna
|
504193010
|
1.20
|
|
|
65.21
|
M/S. Khan Enterprise
|
65.21
|
18/12/2016
|
|
30/12/2017
|
100
|
|
|
12/05/2019
|
|
298
|
IRIDP-2/BGN/DW-24
|
Improvement of Niz Amtali Madrasha RHD – Madu Chairman house UZR (Sonakhali Bazar RHD to Bamna Kholpatua GC road) road ( Ch.00m-1800m)
|
IRIDP-2
|
bamna
|
504195007
|
1.80
|
|
|
80.61
|
M/S. Al-Mamun Enterprise LTD
|
68.44
|
04/10/2016
|
|
08/12/2017
|
100
|
|
|
12/05/2019
|
|
299
|
IRIDP-2/BGN/DW-1
|
Improvement of Ramna UP-Dawatala UP (Battala Culvert) via Golagata Karaitala GPS road (Ch. 00-690m).
|
IRIDP-2
|
bamna
|
504193011
|
0.69
|
|
|
37.84
|
M/S Masum Billah Enterprise
|
32.19
|
21/01/2016
|
|
30/06/2016
|
100
|
|
|
06/05/2019
|
|
300
|
IRIDP-2/BGN/DW-2
|
Improvement of Gudighata Bazar-Napitbari Bridge RHD via Hemayet Member Bari road (Ch. 00-695m).
|
IRIDP-2
|
bamna
|
504195035
|
0.70
|
|
|
38.09
|
M/S Masum Billah Enterprise
|
32.15
|
21/01/2016
|
|
30/06/2016
|
100
|
|
|
06/05/2019
|
|
301
|
IRIDP-2/BGN/DW-22
|
(a)Improvement of South side of Chalitabunia Khal - WAPDA Beribandth -House of Hawlader Bari -Laxipura GPS road.(Ch.00m - 1414m.)(b) Construction of 02nos 1.50mx1.50m culvert at ch.400m & 1250m on the same road.
|
IRIDP-2
|
bamna
|
504194004
|
1.41
|
|
|
85.38
|
M/S. Rupali Construction
|
68.52
|
08/10/2016
|
|
16/11/2017
|
100
|
|
|
06/05/2019
|
|
302
|
IRIDP-2/BGN/DW-23
|
(a)Improvement of Gudighata Bazar-Napitbari Bridge RHD via Hemayet Member Bari road (Ch. 695m – 1770m)(b) Construction of 02nos 0.625mx0.60m culvert at ch.1116m & 1555m on the same road.
|
IRIDP-2
|
bamna
|
504195035
|
1.08
|
|
|
60.71
|
M/S. Rupali Construction
|
47.47
|
04/10/2016
|
|
05/03/2017
|
100
|
|
|
06/05/2019
|
|
303
|
IRIDP-2/BGN/MW-73
|
(a)Maintenance of Fuljhuri GC-Gaurichanna-Ghotbaria-Ayla GC road (Ch.5820m - 7820m.) ID NO. 504282008(b) Construction of 02nos 0.625mx0.900m culvert at ch.6130m,6397m on the same road.
|
IRIDP-2
|
barguna-s
|
504282008
|
2.00
|
|
|
68.59
|
M/S. Ema Traders
|
65.16
|
09/04/2019
|
|
17/10/2019
|
0
|
|
|
06/05/2019
|
|
304
|
IRIDP-2/BGN/MW-74
|
Maintenance of Burirchar UP-Hazarbigha-Kamrabad-Purakata hat Road (Ch.8194m - 10559m.) ID NO. 504473001
|
IRIDP-2
|
barguna-s
|
504283001
|
2.37
|
|
|
68.20
|
M/S. Zitu Enterprise
|
64.79
|
|
|
|
0
|
|
|
06/05/2019
|
|
305
|
IRIDP-2/BGN/MW-56
|
Maintenance of Burirchar UP-Hazarbigha-Kamrabad-Purakata hat road .(Ch.4500m - 5500m.) ID NO. 504283001
|
IRIDP-2
|
barguna-s
|
504283001
|
1.00
|
|
|
27.96
|
M/S. Mithun Traders
|
25.16
|
30/08/2017
|
|
15/01/2018
|
100
|
|
|
05/05/2019
|
|
306
|
IRIDP-2/BGN/MW-58
|
(a)Maintenance of Razzak Master House - Naltona UHC road.(Ch.00m - 500m.) ID NO. 504285219(b) Construction of 01nos 0.625mx0.60m culvert at ch.120m on the same road.
|
IRIDP-2
|
barguna-s
|
504285219
|
0.50
|
|
|
12.76
|
M/S. Khan Enterprise
|
11.48
|
01/01/2018
|
|
05/06/2018
|
100
|
|
|
05/05/2019
|
|
307
|
IRIDP-2/BGN/DW-25
|
(a)Improvement of Bushbunia UZR - Kalirtabok Sluice - Rayertabok H/S (Cyclone Shelter) road.(Ch.00m - 650m.)(b) Construction of 02nos 0.625mx0.60m culvert at ch.200m & 253m on the same road.
|
IRIDP-2
|
barguna-s
|
504284054
|
0.65
|
|
|
42.88
|
M/S, Musolli Construction
|
35.15
|
06/02/2017
|
|
30/04/2018
|
100
|
|
|
05/05/2019
|
|
308
|
IRIDP-2/BGN/DW-27
|
(a)Improvement of Babugonj GC- Padma (Sonatola ) road.(Ch.00m - 2000m.)(b) Construction of 01nos 0.625mx0.60m culvert at ch.720m on the same road.(c) Construction of 01nos 3.0mx3.0m culvert at ch.1643m on the same road.
|
IRIDP-2
|
barguna-s
|
504284048
|
2.00
|
|
|
100.72
|
M/S. Humayun Enterprise
|
85.33
|
24/11/2016
|
|
30/06/2018
|
100
|
|
|
05/05/2019
|
|
309
|
IRIDP-2/BGN/DW-60
|
(a)Improvement of Bhutmara khalgora-Sluice gate ( Monoshatoli GPS) road.(Ch.00m - 1000m.) ID NO. 504285039(b) Construction of 02nos 0.625mx0.60m culvert at ch.167m & 730m on the same road.
|
IRIDP-2
|
barguna-s
|
504285039
|
1.00
|
|
|
64.82
|
M/S Poly Construction
|
58.34
|
20/02/2018
|
|
11/11/2018
|
100
|
|
|
05/05/2019
|
|
310
|
IRIDP-2/BGN/DW-62
|
(a)Improvement of Napilkhli WDB-Batala Madrasha road.(Ch.00m - 1350m.) ID NO. 504285015(b) Construction of 04nos 0.625mx0.90m culvert at ch.70m,153m,420m & 905m on the same road.
|
IRIDP-2
|
barguna-s
|
504285015
|
1.35
|
|
|
89.39
|
M/S. Mithun Traders
|
80.45
|
07/03/2018
|
|
12/12/2018
|
100
|
|
|
05/05/2019
|
|
311
|
IRIDP-2/BGN/MW-54
|
Maintenance of Parir khal GC - Babugong GC road .(Ch.12350m - 14010m.) ID NO. 504282006
|
IRIDP-2
|
barguna-s
|
504282006
|
1.66
|
|
|
38.63
|
Md. Golam Kibria
|
34.77
|
29/08/2017
|
|
10/07/2018
|
50
|
|
|
05/05/2019
|
|
312
|
IRIDP-2/BGN/DW-59
|
(a)Improvement of Barguna-Chalitatali UZR (Shop of Sekander Mistree)-Chanderhat UNR road.(Ch.00m - 1700m.) ID NO. 504285324(b) Construction of 02nos 1.0mx1.0m culvert at ch.630m & 993m on the same road.(c) Construction of 01nos 0.625mx0.90m culvert at ch.140m on the same road.
|
IRIDP-2
|
barguna-s
|
504285324
|
1.70
|
|
|
117.32
|
M/S. Mithun Traders
|
105.59
|
20/02/2018
|
|
30/05/2019
|
70
|
|
|
05/05/2019
|
|
313
|
IRIDP-2/BGN/DW-61
|
(a)Improvement of Rayer Tabak High School West Side Forhad Forazir Bari Via Golbunia Bazar road.(Ch.00m - 800m.) ID NO. 504285283(b) Construction of 01nos 1.50mx1.50m culvert at ch.04m on the same road.(c) Construction of 03nos 0.625mx0.60m culvert at ch.300m,430m & 760m on the same road.
|
IRIDP-2
|
barguna-s
|
504285283
|
0.80
|
|
|
58.43
|
M/S. Mithun Traders
|
52.59
|
07/03/2018
|
|
30/05/2019
|
70
|
|
|
05/05/2019
|
|
314
|
IRIDP-2/BGN/DW-66
|
(a)Improvement of Nali GC-Babugonj GC road.(Ch.4600m - 6100m.) ID NO. 504282009(b) Construction of 04nos 0.625mx0.90m culvert at ch.560m,740m,980m,1195 on the same road.
|
IRIDP-2
|
barguna-s
|
504282009
|
1.50
|
|
|
119.95
|
M/S. Shamdder Construction
|
113.96
|
05/11/2018
|
|
13/06/2019
|
45
|
|
|
05/05/2019
|
|
315
|
IRIDP-2/BGN/DW-68
|
Improvement of Nali GC-Babugonj GC road. (Ch.6100m-710m) ID NO.504282009(b) Construction of 01 nos 0.625mx0.90m culvert at ch.6285 on the same road.
|
IRIDP-2
|
barguna-s
|
504282009
|
1.01
|
|
|
84.98
|
M/S. Azad Treders
|
80.73
|
05/11/2016
|
|
13/05/2019
|
45
|
|
|
05/05/2019
|
|
316
|
IRIDP-2/BGN/MW-16
|
Maintenance of Keorabunia RHD-Ghatbaria Hat-Chandukhali GC, road (Ch. 5600m-7345m)
|
IRIDP-2
|
barguna-s
|
504283003
|
1.75
|
|
|
45.18
|
M/S Md.Delwar Hossain
|
40.00
|
29/03/2016
|
|
06/10/2016
|
100
|
|
|
30/04/2019
|
|
317
|
IRIDP-2/BGN/DW-9
|
(a)Improvement of Khajurtala RHD-Dakhhin Khajurtala GPS-Kumrakhali S K Roy GPS-Bowalkar GCC (Khajurtala –Kumarkhali Ali mia house)Road.(Ch.300m-2300m.) (b) Construction of 04nos 0.625mx0.90m culvert at ch.1660m,1960m 2064m& 2210m on the same road.
|
IRIDP-2
|
barguna-s
|
504284018
|
2.00
|
|
|
93.61
|
M/S. Kamal Enterprise
|
85.99
|
20/03/2016
|
|
02/11/2016
|
100
|
|
|
30/04/2019
|
|
318
|
IRIDP-2/BGN/DW-15
|
(a)Improvement of Parirkhal GC-Chalitatali GC-Chowmuhoni-Nali (Chalitatali Chowmuhoni Part) GC Road.(Ch.6965m-7870m.) (b) Construction of 01no 0.625mx0.60m culvert at ch.7500m on the same road.
|
IRIDP-2
|
barguna-s
|
504282011
|
0.91
|
|
|
64.02
|
M/S Limon traders
|
57.30
|
29/03/2016
|
|
05/12/2016
|
100
|
|
|
30/04/2019
|
|
319
|
IRIDP-2/BGN/MW-16
|
Maintenance of Keorabunia RHD-Ghatbaria Hat-Chandukhali GC, road (Ch. 5600m-7345m)
|
IRIDP-2
|
barguna-s
|
504283003
|
1.75
|
|
|
45.18
|
M/S Md.Delwar Hossain
|
40.00
|
29/03/2016
|
|
06/10/2016
|
100
|
|
|
30/04/2019
|
|
320
|
IRIDP-2/BGN/DW-26
|
(a)Improvement of Keorabunia UP-Ayla GC-Sonarbangla-Naya Hat-Purakata hat road.(Ch.9250m - 10250m.)(b) Construction of 02nos 0.625mx0.60m culvert at ch.9562m & 10090m on the same road.
|
IRIDP-2
|
barguna-s
|
504283012
|
1.00
|
|
|
60.53
|
M/S. Humayun Enterprise
|
51.30
|
24/11/2016
|
|
15/02/2018
|
100
|
|
|
30/04/2019
|
|
321
|
IRIDP-2/BGN/DW-50
|
(a)Improvement of Cotto Gourichanna Dakhil Madrasha-Azimuddin House road.(Ch.1000m - 1400m.) ID NO. 504285145(b) Construction of 01nos 0.625mx0.60m culvert at ch.1060m on the same road.
|
IRIDP-2
|
barguna-s
|
504285145
|
0.40
|
|
|
19.87
|
M/S. Palli Stores,Pro. Md. Golam Sawrar (Badal)
|
17.92
|
05/09/2017
|
|
09/01/2018
|
100
|
|
|
30/04/2019
|
|
322
|
IRIDP-2/BGN/DW-51
|
(a)Improvement of Bara Labangola-Sonakhali Pourashava road.(Ch.00m - 2725m.) ID NO. 504284008(b) Construction of 05nos 0.625mx0.60m culvert at ch.246m,846m,1365m,2178m & 2390m on the same road.(c) Construction of 01nos 2.0mx2.0m culvert at ch.1669m on the same road.
|
IRIDP-2
|
barguna-s
|
504284008
|
2.73
|
|
|
162.56
|
M/S. Mithun Traders
|
146.30
|
13/11/2017
|
|
27/03/2018
|
100
|
|
|
30/04/2019
|
|
323
|
IRIDP-2/BGN/DW-52
|
(a)Improvement of Baro Labangola WDB-Khorshed Ali House road .(Ch.00m - 1750m.) ID NO. 504284010(b) Construction of 03nos 0.625mx0.60m culvert at ch.950m,1150m& 1360m on the same road.
|
IRIDP-2
|
barguna-s
|
504284010
|
1.75
|
|
|
98.72
|
M/S. Mithun Traders
|
98.34
|
25/09/2017
|
|
05/04/2018
|
100
|
|
|
30/04/2019
|
|
324
|
IRIDP-2/BGN/DW-53
|
(a)Improvement of Maitha GPS East Side - Kaderer Pule road .(Ch.00m - 1715m.) ID NO. 504285289(b) Construction of 02nos 0.625mx0.60m culvert at ch.100m& 360m on the same road.
|
IRIDP-2
|
barguna-s
|
504285289
|
1.72
|
|
|
95.35
|
M/S. Mithun Traders
|
95.18
|
27/09/2017
|
|
06/05/2018
|
100
|
|
|
30/04/2019
|
|
325
|
IRIDP-2/BGN/MW-55
|
Maintenance of Barguna UZ HQ - Kakchira GC Via Fuljhuri GC Road(Sadar Part) road .(Ch.9250m - 10250m.) ID NO. 504282003
|
IRIDP-2
|
barguna-s
|
504282003
|
1.00
|
|
|
26.93
|
Md. Golam Kibria
|
24.24
|
29/08/2017
|
|
15/01/2018
|
100
|
|
|
30/04/2019
|
|
326
|
IRIDP-2/BGN/DW-44
|
Improvement of Karuan Faker Master house- Barguna Betagi RHD road.(Ch.1487m - 2500m.) ID NO. 504474156
|
IRIDP-2
|
betagi
|
504474156
|
1.01
|
|
|
56.89
|
Rafiq Construction Co.
|
51.20
|
06/07/2017
|
|
30/12/2018
|
100
|
|
|
13/05/2019
|
|
327
|
IRIDP-2/BGN/DW-43
|
Improvement of Sharishamuri UP office-Gourichanna via Zumaddar Bari road.(Ch.00m - 893m.) ID NO. 504474262
|
IRIDP-2
|
betagi
|
504474262
|
0.89
|
|
|
49.02
|
M/S. Khan Enterprise
|
44.12
|
10/07/2017
|
|
31/03/2019
|
70
|
|
|
13/05/2019
|
|
328
|
IRIDP-2/BGN/DW-45
|
Improvement of Aurbunia Kheyaghat(UZR) - Niamati khal road.(Ch.00m - 1010m.) ID NO. 504474018
|
IRIDP-2
|
betagi
|
504474018
|
1.01
|
|
|
56.05
|
Rafiq Construction Co. (Pvt.) Ltd
|
50.44
|
06/07/2017
|
|
30/12/2018
|
45
|
|
|
13/05/2019
|
|
329
|
IRIDP-2/BGN/DW-46
|
Improvement of Betagi UZ HQ-Badnikhali GC road.(Ch.2700m - 3627m.) ID NO. 504472003
|
IRIDP-2
|
betagi
|
504472003
|
0.93
|
|
|
50.00
|
Rafiq Construction Co. (Pvt.) Ltd
|
45.00
|
07/07/2017
|
|
30/12/2018
|
70
|
|
|
13/05/2019
|
|
330
|
IRIDP-2/BGN/DW-47
|
Improvement of Betagi UP(Utter RanipurGPS)-Jagaikhal Bazar(Police Inspection Centre)road.(Ch.00m - 1470m.) ID NO. 504474233(b) Construction of 01nos 0.625mx0.90m culvert at ch.1100m on the same road.
|
IRIDP-2
|
betagi
|
504474233
|
1.47
|
|
|
96.07
|
M/S. Tareque Enterprise
|
91.27
|
08/07/2018
|
|
30/06/2019
|
50
|
|
|
13/05/2019
|
|
331
|
IRIDP-2/BGN/DW-57
|
Improvement of Bibicini UP – Katakhali scluice ghat bazar road.(Ch.1880-2600m.) ID NO. 504474263Construction of 2 nos. 0.625mX0.900m Culvert at Ch. 1100m & 2050m on the same road.Construction of 1 no. 3.00mX3.00m Culvert at Ch. 1883m on the same road.
|
IRIDP-2
|
betagi
|
504474263
|
0.72
|
|
|
45.04
|
|
45.04
|
05/09/2017
|
|
30/05/2019
|
50
|
|
|
13/05/2019
|
|
332
|
IRIDP-2/BGN/SDW-65
|
Improvement of Aurbunia Kheyaghat(UZR) - Niamati khal Via Pollymongol Bazar road.(Ch.1010m - 1430m.) ID NO. 504474018 & Link road 85.0m
|
IRIDP-2
|
betagi
|
504474018
|
0.51
|
|
|
30.91
|
M/S. R S Business Center
|
32.46
|
28/03/2018
|
|
30/07/2019
|
50
|
|
|
13/05/2019
|
|
333
|
IRIDP-2/BGN/SDW-70
|
(a)Improvement of Laxmipura Madrasha(Laxmipur Bazar)-Bibichini UNR via Khalifabari road.(Ch.585m - 2850m.) ID NO. 504474144(b) Construction of 02nos 3.50mx3.50m culvert at ch.1833m & 2383m on the same road.(c) Construction of 01nos 2.60mx2.00m culvert at ch.2257m on the same road.
|
IRIDP-2
|
betagi
|
504474144
|
2.27
|
|
|
202.68
|
M/S. Mubin Traders
|
192.55
|
06/01/2019
|
|
14/11/2019
|
25
|
|
|
13/05/2019
|
|
334
|
IRIDP-2/BGN/SDW-72
|
(a)Improvement of Betagi UPC-Laxmipura Bazar (Ch.3300m - 4635m.) ID NO. 504473001(b) Construction of 02nos 2x3.0mx3.0m culvert at ch.4425m,4590 on the same road.(c) Construction of 01nos 0.625mx0.900m culvert at ch.4210m on the same road.
|
IRIDP-2
|
betagi
|
504473001
|
1.34
|
|
|
122.93
|
M/S. Asia Enterprise
|
116.78
|
20/02/2019
|
|
25/06/2019
|
10
|
|
|
13/05/2019
|
|
335
|
IRIDP-2/BGN/DW-41
|
Improvement of Kadamtola Bazar- Goalbari Sluicegate road.(Ch.00m - 1900m.)
|
IRIDP-2
|
betagi
|
504474319
|
1.90
|
|
|
107.02
|
M/S. Khan Enterprise
|
91.40
|
23/01/2017
|
|
29/03/2018
|
100
|
|
|
12/05/2019
|
|
336
|
IRIDP-2/BGN/DW-42
|
Improvement of Betagi-Niamati UZR (Putiakhali Bazar) to Gariabunia Bazarroad.(Ch.500m - 1500m.)
|
IRIDP-2
|
betagi
|
504474308
|
1.00
|
|
|
53.40
|
|
44.86
|
23/01/2017
|
|
25/01/2018
|
100
|
|
|
12/05/2019
|
|
337
|
IRIDP-2/BGN/DW-49
|
a) Improvement of Amragasia RHD (Basunda Adasha GPS)-WAPDA Bazar via South Volanathpur GPS road (Ch.00m-700m.) ID NO.504474133(b) Construction of 01nos 2x3.0mx3.0m culvert at ch.298m on the same road.
|
IRIDP-2
|
betagi
|
504474133
|
0.70
|
|
|
53.48
|
M/S. Abul Kalam Azad
|
48.14
|
03/08/2017
|
|
30/05/2018
|
100
|
|
|
12/05/2019
|
|
338
|
IRIDP-2/BGN/DW-13
|
(a)Improvement of Kawnia RHD (Mobile Tower) - Mirzagonj RHD Via Al Modina Hafizia Madrasha (ch.1080m – 2400m) (b) Construction of 01no 2*3.0m*3.60m culvert at ch.1530 on the same road. (c) Construction of 01no 3.0m*3.0m culvert at ch.1880m on the same road.
|
IRIDP-2
|
betagi
|
504474017
|
1.32
|
|
|
112.81
|
M/S. Humayun Enterprise
|
93.41
|
28/03/2016
|
|
07/08/2016
|
100
|
|
|
12/05/2019
|
|
339
|
IRIDP-2/BGN/DW-18
|
Improvement of Mayer Hat (UZR)-Gaurichanna Bazar road.(Ch.2265m - 3121m.)
|
IRIDP-2
|
betagi
|
504474096
|
0.86
|
|
|
50.00
|
M/S. Gazi Construction
|
45.96
|
23/01/2017
|
|
27/02/2019
|
100
|
|
|
12/05/2019
|
|
340
|
IRIDP-2/BGN/DW-3
|
Improvement of Fultala WAPDA Bazar-Shantirhat Bazar-Bibichini UP Office road (Ch. 2850-3744m).
|
IRIDP-2
|
betagi
|
504473020
|
0.89
|
|
|
48.06
|
M/S Khan Enterprise
|
43.44
|
11/04/2016
|
|
17/12/2016
|
100
|
|
|
06/05/2019
|
|
341
|
IRIDP-2/BGN/DW-4
|
Improvement of Betagi UP-Hosnabad UP Office via Goalbari GPS road (Ch. 6319.5 - 7150m).
|
IRIDP-2
|
betagi
|
504473004
|
0.83
|
|
|
46.01
|
M/S Poly Construction
|
43.37
|
03/02/2016
|
|
25/02/2017
|
100
|
|
|
06/05/2019
|
|
342
|
IRIDP-2/BGN/DW-5
|
Improvement of Mokamia UP Office (Masuakhali bazar) – Betagi borguna RHD via Chotto Mokamia-(Battala) road (Ch. 3315-4150m).
|
IRIDP-2
|
betagi
|
504474239
|
0.84
|
|
|
46.16
|
M/S Poly Construction
|
43.63
|
03/02/2016
|
|
28/02/2017
|
100
|
|
|
06/05/2019
|
|
343
|
IRIDP-2/BGN/DW-14
|
(a)Improvement of Buramazumder UP office-Mirzagonj Border via house of Barake Mirdha (ch.880m – 2080m) (b) Construction of 01no 0.625mx0.90m culvert at ch.1180m on the same road.
|
IRIDP-2
|
betagi
|
504474276
|
1.20
|
|
|
67.78
|
M/S Khan Enterprise
|
56.49
|
11/04/2016
|
|
11/04/2017
|
100
|
|
|
06/05/2019
|
|
344
|
IRIDP-2/BGN/SDW-19
|
Improvement of Let. Abdus Salam khan (Kasem) Road(Ch.00m-490m.)
|
IRIDP-2
|
betagi
|
504475040
|
0.49
|
|
|
23.78
|
M/S Khan Enterprise
|
23.63
|
29/05/2016
|
|
15/05/2017
|
100
|
|
|
06/05/2019
|
|
345
|
IRIDP-2/BGN/DW-36
|
(a)Improvement of Charduani UP-Tengra Bazar road (Ch. 4675m – 5875m)(b) Construction of 01nos 0.625mx0.90m culvert at ch.4687m on the same road.
|
IRIDP-2
|
patharghata
|
504853005
|
1.20
|
|
|
71.04
|
M/S. Modina Traders
|
63.32
|
07/12/2016
|
|
07/12/2018
|
100
|
|
|
13/05/2019
|
|
346
|
IRIDP-2/BGN/DW-39
|
(a)Improvement of Patharghata-Kakchira RHD (Akon Bari Battala)-Pachim Kupdhon (Imdad Master Bari) road ( Ch.00m-1700m)(b) Construction of 01nos 1.60mx1.60m culvert at ch.399m on the same road.(c) Construction of 03nos 0.625mx0.90m culvert at ch.295m,1150m & 1360m on the same road.
|
IRIDP-2
|
patharghata
|
504855151
|
1.70
|
|
|
92.59
|
GM Ikfa Enterprise
|
82.17
|
07/12/2016
|
|
16/07/2018
|
100
|
|
|
13/05/2019
|
|
347
|
IRIDP-2/BGN/DW-38
|
(a)Improvement of Kathaltali UP (Keramotpur RHD) -Kamarer Hat road ( Ch.2950m-4930m)(b) Construction of 02nos 0.625mx0.90m culvert at ch.3694m & 4195m on the same road.
|
IRIDP-2
|
patharghata
|
504853021
|
1.98
|
|
|
121.78
|
M/S. F.K Construction
|
121.78
|
07/12/2016
|
|
30/05/2019
|
70
|
|
|
13/05/2019
|
|
348
|
IRIDP-2/BGN/DW-48
|
a) Improvement of Patharghata-Barguna RHD (Alisar More Munshi Bari) Azimpur Bazar via Singrabunia GPS road(Ch.00-1500m)ID NO.504854072(b) Construction of 021nos 0.625mx0.600m culvert at ch.183m & 663m on the same road.
|
IRIDP-2
|
patharghata
|
504854072
|
1.50
|
|
|
88.58
|
M/S. K.K. Enterprise, Pro. Md. Kabir Hossain
|
79.72
|
31/10/2017
|
|
28/02/2019
|
60
|
|
|
13/05/2019
|
|
349
|
IRIDP-2/BGN/DW-67
|
(a)Improvement of Charduani GC-Kathaltali UP (RHD) road.(Ch.1226m - 3660m.) ID NO. 504852004(b) Construction of 06nos 0.625mx0.90m culvert at ch.1338m,1678m, 2342m, 2948m, 3038m, 3540 on the same road.
|
IRIDP-2
|
patharghata
|
504852004
|
2.43
|
|
|
202.72
|
Trinath Kormokar
|
197.65
|
11/11/2018
|
|
19/08/2019
|
60
|
|
|
13/05/2019
|
|
350
|
IRIDP-2/BGN/DW-69
|
Improvement of Patherghata UP (RHD Kazi bari) Khaliferhat via Hatempur Bazar road. (Ch. 710m-2055m) ID NO. 504853017
|
IRIDP-2
|
patharghata
|
504853017
|
1.35
|
|
|
95.90
|
M/S. Shamdder Construction
|
91.11
|
05/11/2018
|
|
13/05/2019
|
50
|
|
|
13/05/2019
|
|
351
|
IRIDP-2/BGN/DW-37
|
(a)Improvement of Nali Bazar-Nachnapara Bazar via North Katakhali Comunity Primary School.road ( Ch.00m-1557m)(b) Construction of 01nos 1.60mx1.60m culvert at ch.785m on the same road.(c) Construction of 01nos 0.625mx0.90m culvert at ch.950on the same road.
|
IRIDP-2
|
patharghata
|
504854050
|
1.56
|
|
|
76.66
|
M/S. FH Enterprise
|
63.58
|
24/11/2016
|
|
31/12/2017
|
100
|
|
|
12/05/2019
|
|
352
|
IRIDP-2/BGN/DW-6
|
Improvement of Mathertali FRB-Chalabhanga Darber Sharif road (Ch. 00-544m).
|
IRIDP-2
|
patharghata
|
504854069
|
0.54
|
|
|
34.28
|
M/S Jami Enterprise
|
29.75
|
26/01/2016
|
|
25/03/2017
|
100
|
|
|
06/05/2019
|
|
353
|
IRIDP-2/BGN/DW-7
|
(a)Improvement of Jamirtala (Raton Member house) - House of Harun Mawlana via Keraitala (Altaf Chairman) road (Ch. 00-1375m). (b) Construction of 03nos 0.625mx0.60m culvert at ch.360m,730m & 994m on the same road.
|
IRIDP-2
|
patharghata
|
504854073
|
1.38
|
|
|
64.53
|
M/S Jami Enterprise
|
56.11
|
26/01/2016
|
|
25/03/2017
|
100
|
|
|
06/05/2019
|
|
354
|
IRIDP-2/BGN/DW-8
|
(a)Improvement of Old Kalmega UP-Munsigonj Bazar via Sonali Madrasha road (Ch. 1500-2280). (b) Construction of 01no 1.6mx1.6m culvert at ch.1825m on the same road. (c)Construction of 01no 0.625mx0.60m culvert at ch.2178m on the same road.
|
IRIDP-2
|
patharghata
|
504853012
|
0.78
|
|
|
47.18
|
M/S Rudra Enterprise
|
40.09
|
26/01/2016
|
|
10/05/2018
|
100
|
|
|
06/05/2019
|
|
355
|
IRIDP-2/BGN/DW-35
|
(a)Improvement of Old Kalmegha UP-Munshigonj Bazar via Sonali Madrasha road.(Ch.2280m - 3500m.)(b) Construction of 01nos 3.0mx3.00m culvert at ch.2840m on the same road.(c) Construction of 02nos 0.625mx0.90m culvert at ch.2915m& 3100 on the same road.
|
IRIDP-2
|
patharghata
|
504853012
|
1.22
|
|
|
76.01
|
M/S. Akon Traders
|
66.00
|
07/12/2016
|
|
31/12/2017
|
100
|
|
|
06/05/2019
|
|
356
|
IRIDP-2/BGN/DW-12
|
(a)Improvement of Taltali-Chairmanhat via Newpara Launchghat, H/O Nasir Mollah & Behala High School (Haribaria sanur bridge - H/O Abjal via Behala GPS) road ( ch.2000m - 3000m) (b) Construction of 02nos 0.625mx0.60m culvert at ch.2325m&3000m on the same road.
|
IRIDP-2
|
Taltali
|
504874113
|
1.00
|
|
|
59.47
|
M/S Poly Construction
|
55.68
|
01/03/2016
|
|
10/02/2017
|
100
|
|
|
05/05/2019
|
|
357
|
IRIDP-2/BGN/DW-64
|
Construction of Ghatla with 300m Approch road on the bank of Andarmanik at Dhaka Kuakata RHD (Mohipur GC) - Taltali GC road via Nishanbaria kheyaghat. ID NO. 504872014
|
IRIDP-2
|
Taltali
|
504872014
|
|
|
|
84.65
|
M/S. Arif & Asif Construction
|
84.22
|
12/04/2018
|
|
17/04/2019
|
100
|
|
|
05/05/2019
|
|
358
|
IRIDP-2/BGN/RDW-34
|
(a)Improvement of Horinbaria (sanur bridge) – Afzal house via behala GPS road. ( Ch.3000m-4000m) (b) Construction of 03nos 0.625mx0.90m culvert at ch.3005m,3550m&3850m on the same road.
|
IRIDP-2
|
Taltali
|
504874113
|
|
|
|
46.33
|
Ahurujjaman Khan Almas
|
44.02
|
01/01/2019
|
|
20/06/2019
|
50
|
|
|
05/05/2019
|
|
359
|
IRIDP-2/BGN/MW-21
|
Maintenance of Bogir hat GC-Taltali GC via taltali Digree collage road (Ch.00m-908m)
|
IRIDP-2
|
Taltali
|
504872004
|
0.91
|
|
|
49.79
|
M/S. Gazi Construction
|
38.92
|
04/10/2016
|
|
30/03/2017
|
100
|
|
|
30/04/2019
|
|
360
|
IRIDP-2/BGN/DW-34
|
Improvement of Horinbaria (sanur bridge) – Afzal house via behala GPS road. ( Ch.3000m-4000m)
|
IRIDP-2
|
Taltali
|
504874113
|
1.00
|
|
|
18.40
|
M/S Masum Billah Enterprise
|
18.40
|
24/11/2016
|
|
12/09/2016
|
100
|
|
|
30/04/2019
|
|
361
|
e-Tender/NBIDNNGPS/BAR/AMT/2017-2018/W1-00369
|
MODDHO TEPURA PRIMARY SCHOOL
|
NBIDNNGPS
|
amtali
|
|
|
|
|
72.21
|
M/S. Sohel Traders
|
68.60
|
|
14/08/2018
|
27/05/2019
|
0
|
|
|
|
|
362
|
e-Tender/NBIDNNGPS/BAR/AMT/2017-2018/W1-00370
|
MAITHA PRIMARY SCHOOL
|
NBIDNNGPS
|
amtali
|
|
|
|
|
72.70
|
Mrs. Jahanara Islam
|
69.06
|
|
14/08/2018
|
25/05/2019
|
0
|
|
|
|
|
363
|
e-Tender/NBIDNNGPS/BAR/AMT/2017-2018/W1-00371
|
CHOWRA LODA PRIMARY SCHOOL
|
NBIDNNGPS
|
amtali
|
|
|
|
|
72.19
|
Md. Allauddin Mirdha
|
68.58
|
|
14/08/2018
|
27/05/2019
|
0
|
|
|
|
|
364
|
e-Tender/NBIDNNGPS/BAR/AMT/2017-2018/W1-00372
|
UTTAR POCHIM TOKTABUNIYA PRIMARY SCHOOL
|
NBIDNNGPS
|
amtali
|
|
|
|
|
79.17
|
M/S Mahi Enterprise
|
75.03
|
|
14/08/2018
|
27/08/2019
|
0
|
|
|
|
|
365
|
e-Tender/NBIDNNGPS/BAR/AMT/2017-2018/W1-00373
|
PATAKATA NURUL HAQUE PRIMARY SCHOOL
|
NBIDNNGPS
|
amtali
|
|
|
|
|
81.00
|
M/S. Saleha Enterprise
|
76.95
|
|
|
|
0
|
|
|
|
|
366
|
e-Tender/NBIDNNGPS/BAR/AMT/2017-2018/W1-00501
|
POCHIM NACHNAPARA PRIMARY SCHOOL
|
NBIDNNGPS
|
amtali
|
|
|
|
|
79.03
|
Gazi Faruque Ahammed
|
75.08
|
|
14/08/2018
|
27/08/2019
|
0
|
|
|
|
|
367
|
e-Tender/NBIDNNGPS/BAR/AMT/2017-2018/W1-00502
|
UTTAR PASCHIM CHILA
|
NBIDNNGPS
|
amtali
|
|
|
|
|
138.46
|
Mr. Ahurujjaman khan Almas
|
131.54
|
|
|
|
0
|
|
|
|
|
368
|
e-Tender/NBIDNNGPS/BAR/AMT/2018-2019/W1-02086
|
UTTAR CHUNA KHALI PRIMARY SCHOOL
|
NBIDNNGPS
|
amtali
|
|
|
|
|
30.76
|
M/S Mohona Enterprise
|
29.23
|
|
|
|
0
|
|
|
|
|
369
|
e-Tender/NBIDNNGPS/BAR/AMT/2018-2019/W1-02087
|
MODDHO SONAKAHALI PRIMARY SCHOOL
|
NBIDNNGPS
|
amtali
|
|
|
|
|
82.88
|
Gazi Mozmmel Haque
|
78.74
|
|
|
|
0
|
|
|
|
|
370
|
e-Tender/NBIDNNGPS/BAR/BAR/2017-2018/W1-01235
|
MODDHO SHAHERB HAWLA PRIMARY SCHOOL
|
NBIDNNGPS
|
barguna-s
|
|
|
|
|
102.84
|
M/S. Mohona Enterprise
|
97.60
|
|
14/06/2018
|
21/04/2018
|
0
|
|
|
|
|
371
|
e-Tender/NBIDNNGPS/BAR/BAR/2017-2018/W1-01240
|
FUL TOLA PRIMARY SCHOOL
|
NBIDNNGPS
|
barguna-s
|
|
|
|
|
84.09
|
M/S. Sharmin Construction
|
79.89
|
|
02/07/2018
|
29/07/2019
|
0
|
|
|
|
|
372
|
e-Tender/NBIDNNGPS/BAR/BAR/2017-2018/W1-01241
|
BADARKAHLI BISAR FASKHOLA PRIMARY SCHOOL
|
NBIDNNGPS
|
barguna-s
|
|
|
|
|
83.15
|
M/S. Khokon Traders
|
78.99
|
|
11/06/2018
|
14/06/2018
|
0
|
|
|
|
|
373
|
e-Tender/NBIDNNGPS/BAR/BAR/2017-2018/W1-01243
|
CHOTO GOURICHANNA RUPNOGAR COM. PRIMARY SCHOOL
|
NBIDNNGPS
|
barguna-s
|
|
|
|
|
73.31
|
M/S. Mahi Enterprise
|
69.65
|
|
24/06/2018
|
04/04/2019
|
0
|
|
|
|
|
374
|
e-Tender/NBIDNNGPS/BAR/BAR/2017-2018/W1-01245
|
MADHYA LEMUA
|
NBIDNNGPS
|
barguna-s
|
|
|
|
|
71.30
|
M/S. Othoi Enterprise
|
67.74
|
|
24/06/2018
|
04/04/2019
|
0
|
|
|
|
|
375
|
e-Tender/NBIDNNGPS/BAR/BAR/2017-2018/W1-01246
|
COLLISH KAUNIA COMMIUNITY PRIMARY SCHOOL
|
NBIDNNGPS
|
barguna-s
|
|
|
|
|
83.07
|
M/S. Jayeda Enterprise
|
78.91
|
|
14/06/2018
|
21/06/2019
|
0
|
|
|
|
|
376
|
e-Tender/NBIDNNGPS/BAR/BAR/2018-2019/W1-02011
|
AMORTOLA DOKKHIN FUL DHALUYA PRIMARY SCHOOL
|
NBIDNNGPS
|
barguna-s
|
|
|
|
|
83.57
|
M/S. Rezaul Kabir Traders
|
79.39
|
|
|
|
0
|
|
|
|
|
377
|
e-Tender/NBIDNNGPS/BAR/BAR/2018-2019/W1-02084
|
UTTER BARO GOURICHANNA COMMUNITY PRIMARY SCHOOL
|
NBIDNNGPS
|
barguna-s
|
|
|
|
|
100.19
|
M/S. Azad Traders
|
95.18
|
|
|
|
0
|
|
|
|
|
378
|
e-Tender/NBIDNNGPS/BAR/PAT/2017-2018/W1-00503
|
HOGLAPASA ADARSO PRIMARY SCHOOL
|
NBIDNNGPS
|
patharghata
|
|
|
|
|
128.60
|
M/S Rudra Enterprise
|
122.17
|
|
30/07/2018
|
11/05/2019
|
40
|
|
|
|
|
379
|
e-Tender/NBIDNNGPS/BAR/PAT/2017-2018/W1-00505
|
UTTAR BETMOR PRIMARY SCHOOL
|
NBIDNNGPS
|
patharghata
|
|
|
|
|
108.71
|
M/S Zaman & Brothers
|
103.27
|
|
30/05/2018
|
03/03/2019
|
5
|
|
|
|
|
380
|
e-Tender/NBIDNNGPS/BAR/PAT/2017-2018/W1-00506
|
MODDHO GOLBUNIYA PRIMARY SCHOOL
|
NBIDNNGPS
|
patharghata
|
|
|
|
|
105.02
|
Md. Kayadur Rahman Manzu
|
99.77
|
|
30/05/2018
|
03/03/2019
|
32
|
|
|
|
|
381
|
e-Tender/NBIDNNGPS/BAR/PAT/2017-2018/W1-01216
|
HOGLA PASABINA PARIN PRIMARY SCHOOL
|
NBIDNNGPS
|
patharghata
|
|
|
|
|
130.26
|
Md. Monir Hossain
|
123.74
|
|
05/08/2018
|
11/05/2019
|
5
|
|
|
|
|
382
|
e-Tender/NBIDNNGPS/BAR/PAT/2017-2018/W1-01754
|
BADAMTOLA PRIMARY SCHOOL
|
NBIDNNGPS
|
patharghata
|
|
|
|
|
83.02
|
M/S. Hasan Enterprise
|
78.87
|
|
23/07/2018
|
11/05/2019
|
15
|
|
|
|
|
383
|
RERMP-3/BA RGU/W-30
|
Maintenance of Rural
Roads Barguna()
|
RERMP-3
|
barguna-s
|
N/A
|
|
|
38
|
1533.00
|
N/A
|
1533.00
|
|
|
|
40
|
586.00
|
38
|
26/12/2021
|
|
384
|
SP25318/Mirar Khal-Magan Khar Khal Subproject
|
Sarderer khal re-excavation(ch.00-4250m) Boshirgudi khal re-excavation(ch.00-2280m) Madborer khal re-excavation(ch.00-1370m) Mouje Ali khal re-excavation(ch.00-1070m) Referenced line seciton(9 Nos.)
|
SSSWRDP
|
amtali
|
|
|
8.97
|
98
|
108.86
|
Subol Mazi
|
108.86
|
01/01/2018
|
28/01/2018
|
30/04/2018
|
100
|
107.28
|
98
|
30/11/2022
|
|
385
|
SP43040/Singkhali Khal Subproject
|
Morichbunia khal(ch.00-5700m) Morichbunia Branch khal(ch.00-1900m) Referenced line section(7 Nos.) Bamboo bridge(7 Nos.)
|
SSSWRDP
|
amtali
|
|
|
7.60
|
93
|
89.67
|
Sunil Chandra Das
Satter Khan
|
89.67
|
13/02/2019
|
11/04/2019
|
25/05/2019
|
100
|
83.64
|
93
|
30/11/2022
|
|
386
|
SP44103/Gotkhali-Chalitabunia Khal Subproject
|
Ghotkhali khal (Ch.00-1000m) Referance Line (8 Nos.) Bamboo Bridge (4Nos.) Patakata Khal (Ch.00-7100m) Re-excavation of Katakhali khal (Ch-0.00m: to 3200.00m) 2022-23 Re-excavation of Bharanir khal (Ch-0.00m: to 2130.00m) 2022-23 Re-excavation of Jhinbunia khal (Ch-0.00m: to 3200.00m) 2022-23 Re-excavation of Boithakata khal (Ch-0.00m: to 1200.00m) 2022-23 Construction of 11 Reference-line sections in 4 canals, SP Identification sign board 2Nos. and SP Indication Post 2Nos 2022-23
|
SSSWRDP
|
amtali
|
|
|
17.83
|
98
|
190.92
|
Uttam Kumar
Md. Attaher
|
190.92
|
24/02/2019
|
30/04/2023
|
30/05/2023
|
100
|
188.43
|
98
|
30/11/2022
|
|
387
|
SP61010/Paschim Chila Subproject
|
Re-exacavation of Gazir khal (Ch-0+000km to 7+300km) Re-exacavation of Dushumir Khal (Ch-0+000km to 1+000km) Re-exacavation of Dushumir Branch khal (Ch-0+000km to 1+455km) Re-exacavation of Rajersar Talukdar Barir khal (Ch-0+000km to 1+000km) Re-exacavation of Mia Gazir khal (Ch-0+000km to 2+936km) Re-exacavation of Mia Gazir Branch khal (Ch-0+000km to 1+281km) Re-exacavation of Charer khal (Ch-0+000km to 2+900km) Re-exacavation of Charer Branch khal (Ch-0+000km to 1+960km) Ref. Lined Section 19 Nos. On 8 Khals, And SP Identf. Signboard (2 nos.) Construction of WMCA office building, Office furniture, Electification works
|
SSSWRDP
|
amtali
|
|
|
19.83
|
100
|
179.27
|
Tuhin
Ibrahim
|
177.22
|
08/02/2021
|
16/08/2021
|
30/04/2021
|
100
|
176.52
|
100
|
30/11/2022
|
|
388
|
SP61011/Purba Sonakhali Subproject
|
WMCA Office & Others Re-exacavation of Simmir khal (Ch-0+000km to 3+753km) Re-exacavation of Krisnaramer Khal (Ch-0+000km to 2+105km) Re-exacavation of Krisnaramer Branch khal (Ch-0+000km to 0+630km) Re-exacavation of Vider khal (Ch-0+000km to 0+929km) Re-exacavation of Babrer khal (Ch-0+000km to 0+643km) Construction of 9 Nos. Reference Lined & SP Identification signboard
|
SSSWRDP
|
amtali
|
|
|
8.06
|
87
|
127.43
|
Selim Khan
|
125.37
|
08/02/2021
|
15/08/2021
|
30/04/2021
|
100
|
110.18
|
87
|
30/11/2022
|
|
389
|
SP43044/Garabunia Subproject
|
Re-Excavation of Garabunia Belaler Khal(Ch.0+000 Km to 3+080 Km) Re-Excavation of Chalitabunia Belaler Khal (Ch.0+000 Km to 0+985 Km) Re-Excavation of Garabunia Branch 1 Khal (Ch.0+000 Km to 1+050 Km) Const. of 8 Nos Reference lined Section on 3 Khals, SP Identf. sign board 2 Nos. and SP Indication Post 2 Nos. Bauria Khal re-xcavation (Ch:0.00m - 4500.00m) 2023-24 Garabunia Khal re-xcavation (Ch:0.00m - 2500.00m) 2023-24 Const. of 08 Nos. Ref. lined Section on 02 Khals, SP Identf. sign board 2, SP Area Indication Post 2 Nos. | 2023-24
|
SSSWRDP
|
amtali
|
|
|
12.11
|
100
|
106.89
|
LCS Presodent : Mst. Rabya Begum
|
106.90
|
14/03/2024
|
24/03/2024
|
28/05/2024
|
100
|
106.54
|
100
|
30/11/2022
|
|
390
|
SP44120/Jabbar Ali - Sharif Shimon Subproject
|
Re-Excavation of Balaibunia Khal (Ch.0+000 Km to 3+200 Km) Re-Excavation of Balaibunia Branch Khal (Ch.0+00 Km to 1+000 Km) Re-Excavation of Mollapara Bill Khal (Ch.0+00 Km to 1+000 Km) Re-Excavation of Fulgazi Barir CAD Khal (Ch.0+00 Km to 1+200 Km) Const. of 10 Nos. Ref. lined Section on 4 Khals, SP Identf. sign board 2 Nos. and SP Indication Post 2 Nos.
|
SSSWRDP
|
amtali
|
|
|
6.40
|
71
|
55.65
|
LCS President- Nesaruddin Padha
|
55.65
|
18/04/2023
|
30/04/2023
|
27/05/2023
|
96
|
40.03
|
71
|
30/11/2022
|
|
391
|
SP62043/Kalank Bogi Subproject
|
Re-excavation of Boga Khal (Ch.0+000 to Ch. 8+000 km) Re-excavation of Kalanka Khal (Ch. 0+000 to Ch. 3+702 km) Re-excavation of Bogi Khal (Ch. 0+000 to Ch. 1+500 km) Re-excavation of Nalganj Khal (Ch. 0+000 to Ch. 1+308 km) Re-excavation of Nalganj Branch Khal (Ch. 0+000 to Ch. 0+909 km) Re-excavation of Kumari Khal (Ch. 0+000 to Ch. 0+971 km) Re-excavation of Khiler Khal (Ch. 0+000 to Ch. 0+475 km) Const. of 17 Nos. Reference lined Section on 7 Khals, SP Identf. sign board 2 Nos., Demercation Post 78 Nos. and SP Indication Post 2 Nos. Const. of Culvert (2v-3.50m x 3.50m) on Kalanka Khal Construction of WMCA office
|
SSSWRDP
|
amtali
|
|
|
15.86
|
74
|
187.54
|
M/S Mohiuddin Ahmed
|
183.14
|
02/03/2023
|
24/03/2023
|
30/05/2023
|
70
|
136.05
|
74
|
30/11/2022
|
|
392
|
SP13049/Dawatala DR Subproject
|
Construction of WMCA Building (Semi pacca) Re-excavation of Choto Bhaijora Khal (Ch: 0.00 - 1400 m) Re-excavation of Bhaijora Khal (Ch: 0.00 - 1025 m) Re-excavation of Darga Barir Khal (Ch: 0.00 - 1500 m) Re-excavation of Egor Khal (Ch: 0.00 - 925 m) Re-excavation of Hogol Patir Khal (Ch: 0.00 - 2400 m) and Provisional Sum. Reference Lined Section (11 nos.) and SP Identification Signboard (2 nos.)
|
SSSWRDP
|
bamna
|
|
|
7.25
|
100
|
82.94
|
M/S H S Engineerd
|
80.57
|
19/02/2020
|
20/08/2020
|
30/04/2020
|
100
|
80.42
|
100
|
30/11/2022
|
|
393
|
SP15290/Maitha Khal DR Subproject
|
Amrajuri Khal re-excavation(ch.00-3500m) Khakbunia Khal re-excavation(ch.00-1485m) Koraitola Khal re-excavation(ch.00-1860m) Khejurtola Khal re-excavation(ch.00-1460m) Ehurchan Khal re-excavation(ch.00-1000m) Referenced Line section(11 Nos.) Bamboo bridge(11 Nos.)
|
SSSWRDP
|
barguna-s
|
|
|
9.30
|
100
|
91.73
|
Shree Nemai Chandra
Md. Atick Hossen
|
92.24
|
18/02/2019
|
12/03/2019
|
18/05/2019
|
100
|
92.24
|
100
|
30/11/2022
|
|
394
|
SP15332/Baliatali DR Subproject
|
Bara Balia Tali Khal Re-excavation(ch0.00-1200m) Baliatali Branch Khal Re-excavation(ch0.00-2160m) Agapara Branch Khal Re-excavation(ch0.00-300m) Paler Baliatali Khal Re-excavation(ch0.00-792m) Baliatali Thadamara Branch Khal Re-excavation(ch0.00-480m) Rarir Khal Re-excavation(ch0.00-365m) Ref. Lined Section 8 Nos. On 6 Khals, And SP Identf. Signboard (2 nos.)
|
SSSWRDP
|
barguna-s
|
|
|
5.29
|
100
|
42.71
|
Panu Mollick(President) Abdul Awaual
|
42.71
|
24/01/2021
|
17/02/2021
|
07/04/2021
|
100
|
42.35
|
100
|
30/11/2022
|
|
395
|
SP25324/Parir Khal Subproject
|
Amlokitola khal re-excavation(ch.00-6100m) Bain Samerto khal re-excavation(ch.00-2000m) Referenced line section(8 Nos.)
|
SSSWRDP
|
barguna-s
|
|
|
8.10
|
100
|
102.11
|
Sonia akter
|
102.11
|
03/01/2018
|
18/01/2018
|
25/04/2018
|
100
|
101.94
|
100
|
30/11/2022
|
|
396
|
SP43029/Nur Ali-Burirchar Charakgachia
|
Nolitolar khal re-excavation(ch.00-4500m) Charakgachia khal re-excavation(ch.00-3800m) Referenced line section(8 Nos.) Bamboo bridge(6 Nos.)
|
SSSWRDP
|
barguna-s
|
|
|
8.30
|
100
|
89.07
|
Salma Begum
Md. Sagir Hossen
|
89.07
|
24/02/2019
|
12/03/2019
|
20/05/2019
|
100
|
88.93
|
100
|
30/11/2022
|
|
397
|
SP43030/Aylapatakata Sub-project
|
Re-excavation of Lakshman Shikhari Khal (Ch-0+00km to 0+555km) Re-excavation of Panjur Khal (Ch-0+000km to 1+110km) Re-excavation of Gabtali Khal (Ch-0+000km to +720km) Re-excavation of Pakur Gachia Khal (Ch-0+000km to 2+200km) Re-excavation of Kewabunia Khal (Ch-0+000km to 0+990km) Ref. Lined Section 11 Nos. On 5 Khals, And SP Identf. Signboard (2 nos.)
|
SSSWRDP
|
barguna-s
|
|
|
5.57
|
100
|
72.77
|
Sanu Sikder
Sirin
|
72.77
|
20/03/2022
|
28/03/2022
|
29/04/2022
|
100
|
72.59
|
100
|
30/11/2022
|
|
398
|
SP43034/Potka Khali Subproject
|
Noli Bharani khal re-excavation(ch.2600-5950m) Noli Bharani Branch khal re-excavation(ch.00-2600m) Uttar Dhalvanga khal re-excavation(ch.00-1260m) Golbunia khal re-excavation(ch.00-985m) Tunibaria khal re-excavation(ch.00-700m) Referenced line section(11 Nos.) Bamboo bridge(11 Nos.)
|
SSSWRDP
|
barguna-s
|
|
|
8.89
|
100
|
81.28
|
Shapan
Khaleq
|
81.86
|
20/02/2019
|
01/04/2019
|
25/05/2019
|
100
|
81.86
|
100
|
30/11/2022
|
|
399
|
SP43041/Sonbunia Subproject
|
Aga Poddha khal re-excavation(ch.00-4700m) Ungaria khal re-excavation(ch.00-540m) Nolirdon khal re-excavation(ch.00-335m) Referenced line section(7 Nos.) Bamboo bridge (4 Nos.)
|
SSSWRDP
|
barguna-s
|
|
|
5.57
|
100
|
76.15
|
Yunus Akon
Md. Sagir
|
76.15
|
25/03/2019
|
08/04/2019
|
25/05/2019
|
100
|
76.11
|
100
|
30/11/2022
|
|
400
|
SP61016/Raybhog Subproject
|
Re-excavation of Rayvog Khal (Ch-0+000km to 0+822km) Re-excavation of Rayvog Branch Khal (Ch-0+000km to 0+535km) Re-excavation of Noli Chargachia Khal (Ch-0+200km to 4+340km) Re-excavation of Noli Chargachia Branch Khal (Ch-0+000km to 2+850km) Re-excavation of Kodom Tola Khal (Ch-0+000km to 3+100km) Re-excavation of Uttar khakbunia Khal (Ch-0+000km to 1+045km) Ref. Lined Section 13 Nos. On 7 Khals, And SP Identf. Signboard (2 nos.) Construction of WMCA office building
|
SSSWRDP
|
barguna-s
|
|
|
12.49
|
100
|
135.77
|
Sayed Ali
Zahanara Begum
|
133.79
|
27/12/2021
|
23/01/2022
|
28/04/2022
|
100
|
133.49
|
100
|
30/11/2022
|
|
401
|
SP62046/Sonatala Subproject
|
Re-excavation of Aga Padma Khal (Ch. 0+000 to Ch. 3+216 km) Re-excavation of Aga Padma Khal Br.1 (Ch. 0+000 to Ch. 1+205 km) Re-excavation of Aga Padma Khal-2 (Ch.0+000 to Ch.0+375 km) Re-excavation of Pritambar Khal (Ch. 0+000 to Ch. 2+130 km) Re-excavation of Sonatala Khal (Ch. 0+000 to Ch. 1+110m) Re-excavation of Sonatala Br-1 Khal (Ch. 0+000 to Ch. 0+750m) Re-excavation of Sonatala Br-2 Khal (Ch. 0+000 to Ch. 3+617m) Re-excavation of Sonatala Br-3 Khal (Ch. 0+000 to Ch. 0+460m) Re-excavation of Sonatala Br-4 Khal (Ch. 0+000 to Ch. 0+288m) Const. of 14 Nos Ref. lined Section on 9 Khal, SP Identf. sign board 2 Nos., Demarcation Post 36 Nos. and SP Indication Post 2 Nos. Construction of WMCA office
|
SSSWRDP
|
barguna-s
|
|
|
13.15
|
100
|
199.68
|
Mohammed eunus & Brothers (Pvt.) Ltd
|
197.34
|
20/03/2023
|
30/03/2023
|
30/05/2023
|
100
|
195.87
|
100
|
30/11/2022
|
|
402
|
SP42024/Nishanbari-Gazi Mahmud Subproject
|
Gazi Mahmud Khal re-excavation (Ch:0.00 - 2900m) Rashidar Khal re-excavation (Ch:0.00 - 975.00m) Nishanbaria Branch-1 Khal re-excavation (Ch:0.00 - 1100.00m) Nishanbaria Branch-2 Khal re-excavation (Ch:0.00 - 500.00m) Const. of 08 Nos. Ref. lined Section on 4 Khals, SP Identf. sign board 2, SP Area Indication Post 2 Nos.
|
SSSWRDP
|
barguna-s
|
|
|
5.47
|
100
|
37.33
|
LCS Secretary : Mst. Sabina Begum
|
37.33
|
20/02/2024
|
27/02/2024
|
28/04/2024
|
100
|
37.30
|
100
|
30/11/2022
|
|
403
|
SP25308/Chhoto Mokamia-Bara Mokamia Subproject
|
Houder khal re-excavation(ch.00-3200m) Houder branch khal-1re-excavation(ch.00-600m) Houder branch khal-2 re-excavation(ch.00-1300m) Houder branch khal-3 re-excavation(ch.00-1200m) Sarder jugir khal re-excavation(ch.00-1500m) Chorkhali khal re-excavation(ch.00-1525m) Kurular khal re-excavation(ch.00-600m) Referenced line section(12Nos.)
|
SSSWRDP
|
betagi
|
|
|
9.92
|
100
|
115.59
|
Zalil Khan
|
115.58
|
19/02/2020
|
16/01/2018
|
30/04/2018
|
100
|
115.28
|
100
|
30/11/2022
|
|
404
|
SP42016/Gabua Fultala Subproject
|
Re-excavation of Modoner Khal (Ch-0+00km to 1+800km) Re-excavation of Baroir Khal (Ch-0+000km to 2.400km) Re-excavation of Jintala Khal (Ch-0+000km to 1+250km) Re-excavation of Gabua Branch Khal (Ch-0+000km to 0+850km) Re-excavation of Gabua Hawlader Barir Branch Khal (Ch-0+000km to 0+700km) Re-excavation of Shaner Branch Khal (Ch-0+000km to 0+900km) Ref. Lined Section 14 Nos. On 6 Khals, And SP Identf. Signboard (2 nos.)
|
SSSWRDP
|
betagi
|
|
|
7.90
|
96
|
47.90
|
Munni Akther
Mst.Sania Begum
|
47.90
|
15/02/2022
|
28/02/2022
|
30/04/2022
|
100
|
46.46
|
96
|
30/11/2022
|
|
405
|
SP43048/Deshantarkathi-Gouribunia Subproject
|
Re-excavation of Dasher Branch Khal-4 (Ch-0+000km to 1+100km) Re-excavation of Parer Branch Khal-1 (Ch-0+000km to 2+045km) Re-excavation of Parer Branch Khal-2 (Ch-0+000km to 0+500km) Re-excavation of Dasher Branch Khal-1 (Ch-0+00km to 0+770km) Re-excavation of Bamoner Branch Khal-1 (Ch-0+000km to 1+500km) Re-excavation of Bamoner Branch Khal-2 (Ch-0+000km to 0+900km) Re-excavation of Dasher Branch Khal-2 (Ch-000 m to 600 m) Ref. Lined Section 10 Nos. On 7 Khals, And SP Identf. Signboard (2 nos.)
|
SSSWRDP
|
betagi
|
|
|
7.41
|
98
|
69.84
|
Selina Khatun
Md.Hannan Sikder
|
69.84
|
15/02/2022
|
28/02/2022
|
26/04/2022
|
100
|
68.61
|
98
|
30/11/2022
|
|
406
|
SP14182/Kawnia-Mirjaganj FCD Subproject
|
Construction of WMCA Office
|
SSSWRDP
|
betagi
|
|
|
0.00
|
0
|
22.85
|
OTM
|
22.85
|
01/01/1900
|
|
|
0
|
0.00
|
0
|
30/11/2022
|
|
407
|
SP13071/Koralia-Hazir Khal DR Subproject
|
Padda Sluicegate-Karomjatola khal re-excavation(ch.00-3100m) Gohorpur moddhokola-purbo Mirabari khal re-excavation(ch.00-2000m) Ruhita -majher khal re-excavation (ch. 00-1820 m) Koralia-Hazir khal re-excavation(ch.00-1400m)
|
SSSWRDP
|
patharghata
|
|
|
8.32
|
100
|
119.14
|
Tariqul Khan
|
126.23
|
29/03/2018
|
03/04/2018
|
30/04/2018
|
100
|
126.23
|
100
|
30/11/2022
|
|
408
|
SP15268/Kakchira DR Subproject
|
Golbunia khal re-excavation(ch.00-3000m) Katakhali-Fakirhat khal re-excavation(ch.00-5270m) Referenced line section on Kakchira Varani Khal (8 Nos.)
|
SSSWRDP
|
patharghata
|
|
|
8.27
|
100
|
121.01
|
Sonkor Kormoker
|
121.88
|
27/02/2018
|
14/03/2018
|
30/04/2018
|
100
|
121.88
|
100
|
30/11/2022
|
|
409
|
SP25315/Kalmegha-Ghutabachha Subproject
|
Choto Pathorghata khal re-excavation(ch.00-7100m) Choto Pathorghata branch khal re-excavation(ch.00-840m) Referenced line section
|
SSSWRDP
|
patharghata
|
|
|
7.94
|
100
|
122.92
|
Sohel
|
122.92
|
12/03/2018
|
15/03/2018
|
28/04/2018
|
100
|
122.68
|
100
|
30/11/2022
|
|
410
|
SP62044/Gandamara Subproject
|
Re-excavation of Aowaler Khal (Ch.0+000 to Ch.2+058 km) Re-excavation of Gandamara Khal (Ch. 0+000 to Ch. 3+739 km) Const. of 6 Nos. Ref. lined Section on 2 Khals, SP Identf. sign board 2 Nos., Demercation Post 36 Nos. and SP Indication Post 2 Nos. Const. of Culvert (2v-2.50m x 3.00m) on Aowaler Khal Construction of WMCA office. (12.00m x 6.00m)
|
SSSWRDP
|
Taltali
|
|
|
5.79
|
66
|
121.39
|
M/S Mohiuddin Ahmed
|
116.95
|
27/03/2023
|
27/03/2023
|
30/05/2023
|
60
|
77.32
|
66
|
30/11/2022
|
|
411
|
SP62045/Gabtalir Khal Subproject
|
Re-excavation of Baraitali Khal (Ch.0+000 to Ch.2+900 km) Re-excavation of Baraitali Branch Khal (Ch. 0+000 to Ch. 0+900 km) Re-excavation of Gabtalir Khal (Ch. 0+000 to Ch. 1+650 km) Re-excavation of Beduria Khal (Ch. 0+000 to Ch. 2+000 km) Const. of 7 Nos Reference lined Section on 4 Khal, SP Identf. sign board 2 Nos., Demarcation Post 34 Nos. and SP Indication Post 2 Nos. Construction of WMCA office. (12.00mx6.00m)
|
SSSWRDP
|
Taltali
|
|
|
7.45
|
98
|
130.24
|
Mohammed eunus & Brothers (Pvt.) Ltd
|
127.92
|
20/03/2023
|
30/03/2023
|
25/12/2023
|
100
|
126.57
|
98
|
30/11/2022
|
|
412
|
SP15333/Khatachora DR Subproject
|
Re-excavation of Khatachora Khal (Ch: 0 to 4500 m) Re-excavation of Koraitola Khal (Ch: 0 to 2700 m) Ref. Line Section (8nos.) and SP Identification Signboard (2nos.) Jayal Bhanga Khal re-excavation (Ch:0.00 - 2600m) 2023-24 Beltala Khal re-excavation (Ch:0.00 - 2200.00m) 2023-24 Ratanilla Khal re-excavation (Ch:0.00 - 1200.00m) 2023-24 Bawltala Khal re-excavation (Ch:0.00 - 800.00m) 2023-24 Const. of 10 Nos. Ref. lined Section on 4 Khals, SP Identf. sign board 2, SP Area Indication Post 2 Nos. 2023-24 Construction of WMCA Office (12m X 6m)
|
SSSWRDP
|
Taltali
|
|
|
14.00
|
51
|
145.43
|
Sohag (President) Ali Akbar (Sec)
|
143.04
|
12/03/2024
|
22/03/2024
|
16/04/2021
|
43
|
74.19
|
51
|
30/11/2022
|
|
413
|
w.465
|
Construction of 3 no ramna UP Complex
|
UCCP-2
|
bamna
|
|
|
|
100
|
127.39
|
|
125.92
|
05/03/2017
|
|
30/09/2018
|
100
|
125.70
|
100
|
09/08/2020
|
|
414
|
w.151
|
Construction of gouricanna UP Complex
|
UCCP-2
|
barguna-s
|
|
|
|
100
|
115.86
|
|
107.11
|
25/11/2015
|
|
30/06/2017
|
100
|
105.17
|
100
|
09/08/2020
|
|
415
|
076/246
|
Cons. of fuljhuri up
|
UCCP-2
|
barguna-s
|
|
|
|
100
|
81.00
|
|
81.69
|
08/01/2011
|
|
30/06/2015
|
100
|
180.90
|
100
|
10/07/2020
|
|
416
|
075/246
|
Cons. of keorabunia up
|
UCCP-2
|
barguna-s
|
|
|
|
100
|
81.00
|
|
84.50
|
08/11/2010
|
|
30/11/2017
|
100
|
81.18
|
100
|
10/07/2020
|
|
417
|
058/176
|
Construction of betagi UP Complex
|
UCCP-2
|
betagi
|
|
|
|
100
|
59.00
|
|
63.41
|
10/12/2012
|
|
31/12/2015
|
100
|
63.03
|
100
|
31/08/2020
|
|
418
|
w.206
|
Construction of 6 no kazirabad UP Complex
|
UCCP-2
|
betagi
|
|
|
|
100
|
121.10
|
|
99.99
|
24/01/2016
|
|
30/09/2019
|
100
|
70.00
|
100
|
09/08/2020
|
|
419
|
077/246
|
Cons. of koraibaria up
|
UCCP-2
|
Taltali
|
|
|
|
100
|
88.86
|
|
88.86
|
15/03/2010
|
|
14/09/2010
|
100
|
88.86
|
100
|
10/07/2020
|
|
420
|
CBU-100/ Purto-424
|
বরগুনা জেলার আমতলী উপজেলাধীন আমড়াগছিয়া বাজার জঐউ খেকুয়ানি গুলিশাখালী সড়ক ২০০মি. চেইনেজে(রোড আইডি ৫০৪০৯৪০৮১) সেতু নির্মাণ।
|
UHBP
|
amtali
|
504094081
|
|
66.00
|
0
|
691.76
|
M/S. Kohinoor Enterprise-S.Ananta Bikash Tripura(JV)
|
622.58
|
15/05/2022
|
19/05/2022
|
02/06/2024
|
90
|
490.00
|
0
|
28/09/2024
|
|
421
|
CBU-100/ Purto-426
|
বরগুনা জেলার বামনা উপজেলাধীন সৈয়দ ড. এর বাড়ী থেকে আলতাফ মাষ্টারের বাড়ী সড়কে ১১০০মিটার চেইনেজে (রোড আইডি-৫০৪১৯৪১১৪) সেতু নির্মাণ।
|
UHBP
|
bamna
|
504194114
|
|
22.00
|
0
|
311.94
|
M/S. Kham Enterprise
|
244.76
|
16/03/2022
|
24/03/2022
|
30/06/2024
|
75
|
165.00
|
0
|
28/09/2024
|
|
422
|
CBU-100/ Purto-233
|
বরগুনার জেলার সদর উপজেলাধীন সুজাউদ্দিন খেয়াঘাট- রোডপাড়া বাজার সড়কে ৪০০ মিটার সুজাউদ্দিন খেয়াঘাট ব্রিজ নির্মাণ (রোড আইডিঃ ৫০৪২৮৪০৩৩)
|
UHBP
|
barguna-s
|
504284033
|
|
72.00
|
0
|
707.60
|
M/S. Abul Kalam Azad
|
558.92
|
06/04/2021
|
14/04/2021
|
30/06/2024
|
80
|
370.06
|
0
|
28/09/2024
|
|
423
|
CBU-100/ Purto-236
|
বরগুনা জেলার বেতাগি উপজেলাধীন ভরা - সরিষামরি সড়কে ৫০ মিটার চেইনেজে ব্রিজ নির্মাণ (রোড আইডিঃ ৫০৪৪৭৪০১৪)
|
UHBP
|
betagi
|
504474014
|
|
42.00
|
0
|
314.83
|
M/S. Abul Kalam Azad. Muslimpara, Sadar, Patuakhali.
|
245.55
|
25/11/2021
|
02/12/2021
|
30/06/2024
|
40
|
0.00
|
0
|
28/09/2024
|
|
424
|
CBU-100/ Purto-237
|
বরগুনা জেলার বেতাগি উপজেলাধীন ব্রিজের হাট সেতুর হাট পুলিশফাড়ি-পশ্চিম রানীপুর সরকারী প্রাথমিক বিদ্যালয় সড়কে ব্রিজ নির্মাণ (রোড আইডিঃ ৫০৪৪৭৪২৩৩)
|
UHBP
|
betagi
|
504474233
|
|
42.00
|
0
|
567.20
|
M/S. Islam Brothers Ltd
|
439.41
|
13/04/2021
|
20/04/2021
|
30/05/2024
|
90
|
362.56
|
0
|
28/09/2024
|
|
425
|
CBU-100/ Purto-425
|
বরগুনা জেলার পাথরঘাটা উপজেলাধীন জামিরতলা-রতন মেম্বারের বাড়ী-ইস্কান্দার ফকির বাড়ী সড়কে ১৩৪০মিটার চেইনেজে (রোড আইডি-৫০৪৮৫৪০৬৫) সেতু নির্মাণ।
|
UHBP
|
patharghata
|
504854065
|
|
31.00
|
0
|
385.39
|
M/S. Mohiuddin Ahmed
|
346.85
|
18/06/2023
|
01/08/2023
|
30/11/2024
|
60
|
197.38
|
0
|
28/09/2024
|
|
426
|
UIIP-BC/PCO/W-537
|
A) Construction of One no. Shed for Public Transport Passenger (28.00sqm) at Lanch Ghat at Ward No.07, Under Betagi Pourashava, Dist: Barguna. B) Construction of One Storied Public Toilet (Type A=56.00sqm) at Lanch Ghat at ward No.-07 Under Betagi Pourashava, Dist: Barguna.
|
UIIP
|
betagi
|
|
|
|
100
|
47.33
|
M/S Al-Amin Enterprise
|
47.23
|
19/09/2022
|
19/09/2022
|
18/09/2023
|
100
|
47.10
|
100
|
07/10/2024
|
|
427
|
UIIP-BC/PCO/W-548
|
A) Construction of RCC Road from Mridha Bari to Khalpar (Ch.0.00-260.00m) at Ward no-04 Under Betagi Pourashava, Barguna. (Salvage Amount-74,988.00)B) Construction of RCC Road with one no. U-Drain from Habib Councillor Home to Alam Councillor Home (Ch.0.00-188.00m) & both side of box Culvert (Ch.188.00-210.00=22.00m) at ward no.03. Under Betagi Pourashava, Barguna. (Salvage Amount-24,773.00)
|
UIIP
|
betagi
|
|
0.47
|
|
100
|
77.34
|
M/S Al-Amin Enterprise
|
77.18
|
26/07/2023
|
26/07/2023
|
25/07/2024
|
100
|
77.13
|
100
|
07/10/2024
|
|
428
|
UIIP-BC/PCO/W-549
|
A) Construction of RCC Road with 04 nos U-drain from Khalil Contractor Home to Masud Prof. Home via Moti Khan Home (Ch:0.00-316.00m) at ward no.08 under Betagi Pourashava, Barguna. (Salvage Amount-10,603.00) B) Construction of RCC Road from Madrasha BC road to Nasir Uddin Pijus Home Ch:0.00-175.00m at ward no.08 Under Betagi Pourashava, Barguna. (Salvage Amount-12,701.00)
|
UIIP
|
betagi
|
|
0.49
|
|
77
|
84.11
|
M/S Anfa Enterprise
|
83.89
|
26/07/2023
|
26/07/2023
|
25/07/2024
|
100
|
64.65
|
77
|
07/10/2024
|
|
429
|
UIIP-BC/PCO/W-550
|
A) Construction of RCC Road from Madrasha BC road to Al-Amin Mollik Home Ch.0.00m-100.00m and in front of Jalil Mollik Home Ch:0.00-70.00m at ward no.08 Under Betagi Pourashava, Barguna. (Salvage Amount-16,743.00)
B) Construction of RCC Road from RHD road to Dhali Khanda road via Panna Home Ch.0.00-371.00m at ward no.03 under Betagi Pourashava, Barguna. (Salvage Amount-31,176.00)
C) Construction of RCC Road from Wapda raod to Nondi Bari Ch.0.00-134.00m at Ward No.-06 Under Betagi Pourashava, Barguna. (Salvage Amount-9237.00)
|
UIIP
|
betagi
|
|
0.68
|
|
86
|
94.71
|
M/S Subama Enterprise
|
94.38
|
26/07/2023
|
26/07/2023
|
25/07/2024
|
100
|
80.82
|
86
|
07/10/2024
|
|
430
|
UIIP-BC/PCO/W-305
|
Construction of one Storied Vegetable & Agricultural Products Market on 3-Storied Foundation (Floor Area= 270.00 sqm) under Betagi Pourashava, Barguna.
|
UIIP
|
betagi
|
|
|
|
41
|
149.90
|
M/S Shikder Construction
|
149.75
|
20/09/2023
|
20/09/2023
|
19/09/2024
|
75
|
60.69
|
41
|
07/10/2024
|
|
431
|
UIIP/PCO/G-33
|
Implementation & Supply 439 nos Waste Basket (120 ltr) & 30 nos Non-motorized vehicle (van) under Betagi Pourashava District: Barguna.
|
UIIP
|
betagi
|
|
|
|
|
39.98
|
RFL Plastrics Limited
|
26.60
|
|
|
|
50
|
|
|
07/10/2024
|
|
432
|
UIIP-BC/PCO/W-39
|
Construction of RCC road from Daser Bridge to RCC road via Akon Bari & Wazed commander home at ward no.02 & 03.Ch. 00.00m-1073.00m.
|
UIIP
|
betagi
|
|
1.07
|
0.00
|
100
|
93.06
|
M/S Khan Enterprise
|
92.96
|
09/08/2020
|
16/08/2020
|
15/08/2020
|
100
|
92.96
|
100
|
29/09/2022
|
|
433
|
UIIP-BC/PCO/W-41
|
Construction of RCC road form Basonda Govt. Primary School to Carpating Road Via Dali kandha Pul Ch 00-1132 at Ward no3.
|
UIIP
|
betagi
|
|
1.13
|
0.00
|
100
|
98.17
|
M/S Khan Enterprise
|
98.13
|
09/08/2020
|
16/08/2020
|
15/08/2020
|
100
|
98.13
|
100
|
29/09/2022
|
|
434
|
UIIP-BC/PCO/W-42
|
A Construction of RCC road form Mahamudar gola to Hafizia Madrasha Ch 00.00-620.0 m at Ward no1
B Construction of RCC road with side Guide Wall Ch. 00.00-35.00m form Rafil Haji bari to Montu commissioner bari via Juwel and Sabina Yeasmin Doly Home Ch. 00.00-275.00m and Biswas bari to Habib commissioner home Ch 00.00-200.0m Total 475.00m at Ward no 03.
|
UIIP
|
betagi
|
|
1.10
|
0.00
|
100
|
96.83
|
M/S Shikder Enterprise
|
96.77
|
09/08/2020
|
16/08/2020
|
15/08/2020
|
100
|
96.77
|
100
|
29/09/2022
|
|
435
|
UIIP-BC/PCO/W-199
|
i. Construction of RCC road form Mahasarak to Baro Khal via Mridha Bari Ch 00.00-250.00m at Ward no:4,
ii. Construction of RCC road form Food Godown with palasiding (Ch. 90.00-250.00m ) to Mahamudar Gola Via Khal Par 00.00-300.00m at Ward no:1. Under Betagi Pourashava,
iii. Construction of RCC road form Hijoltala Primary School to Joynal Fakir home Ch 00.00-100.00m at Ward no:3 Under Betagi Pourashava, Barguna and
iv. Construction of RCC road with side Guide Wall form Upazila Quqrter to WAPDA road via Muslim Koloni Ch 00.00-192.00 m at Ward no: 08 Under Betagi Pourashava, Barguna
|
UIIP
|
betagi
|
|
0.84
|
0.00
|
99
|
85.29
|
M/S Hakkanur Enterprise
|
85.10
|
25/10/2020
|
01/11/2020
|
24/10/2021
|
100
|
85.10
|
99
|
29/09/2022
|
|
436
|
UIIP-BC/PCO/W-200
|
A Construction of RCC Drain from Captain Selim home to Jelepara Mondir via Govt College to Manik Khan home Ch. 00.00-410.00mat ward No. 05. Under Betagi Pourashava Barguna and ii. Construction of RCC Drain in front of Babul Mia home and kacha bazar to Madrasha Ch 00.00-190.00 m at Ward no 08. Under Betagi Pourashava Barguna B Construction of RCC road from College Pond to Humayun Professor via College Mosque 220.00m Betagi-Patuakhali road to Sayed Jakir home 60.00m College road to Harun Fakir home 75.00m at ward no.05 & 1 No. Ward Carpeting road to Tota Member home 200.00m at ward no. 01 Under Betagi Pourashava Barguna.
|
UIIP
|
betagi
|
|
1.15
|
0.00
|
100
|
122.33
|
M/S Shikder Enterprise
|
122.09
|
22/10/2020
|
|
28/10/2021
|
100
|
122.07
|
100
|
29/09/2022
|
|
437
|
UIIP-BC/PCO/W-201
|
A Construction of RCC road form Betagi Niamoti Highway Road to Dafi Howlader Bari via Purbo Betagi Primary School Ch 00.00-518.40 m at Ward no2. Under Betagi Pourashava.
B Construction of RCC road form by pass road to Upazila chairman bari Ch 00.00-180.0 m at Ward no9 Under Betagi Pourashava
C Construction of RCC work for Khas Kachari Math of Agriculture & Product Market Length-32.00m B-15.00m at ward No. 07 Under Betagi Pourashava.
|
UIIP
|
betagi
|
|
0.73
|
0.00
|
100
|
81.24
|
M/S Khan Enterprise
|
81.06
|
22/10/2020
|
|
28/10/2021
|
100
|
81.02
|
100
|
29/09/2022
|
|
438
|
UIIP-BC/PCO/W-40
|
A. Construction of RCC road with road side Guide Wall form Baily Bridge to By pass Road Via Goni Howlader Bari Ch 00-627 at Ward no 9
B. Construction of RCC road with side Guide Wall Ch. 302.00-332.00m form Baro khaler par to WAPDA road via Mazibar Howlader bari Ch 00.00-332.0 m at Ward no8.
|
UIIP
|
betagi
|
|
0.99
|
0.00
|
100
|
86.34
|
M/S Khan Enterprise
|
86.25
|
09/08/2020
|
16/08/2020
|
15/08/2020
|
100
|
86.25
|
100
|
29/09/2022
|
|
439
|
UIIP-BC/PCO/W-404
|
A) Construction of RCC Road with Guide wall from Upazila Parished Gate to South Side Upazila Parished Complex (Ch:0.00-124.00m) all side of Upazila Parished Pond (Ch:0.00-360.00m) Upazila Parished to KG School Via DPHE Office (Ch:0.00-260.00m) at ward No.07 (B) Salamer Barir Culvert to Betagi-Niamoti road (Ch:0.00-176.00m) at ward No.03 under Betagi Pourashava District : Barguna Total Length=920m.
|
UIIP
|
betagi
|
|
0.92
|
0.00
|
0
|
129.48
|
M/S Shikder Enterprise
|
129.31
|
17/05/2022
|
|
16/05/2023
|
32
|
0.00
|
0
|
29/09/2022
|
|
440
|
UIIP-BC/PCO/W-405
|
A) Construction of 01 No. 1-Vent Culvert size (3.00X3.00)m of Bapari Bari fornt site word no. 03 Under Betagi Pourashava District: Barguna.
B) Construction of 01 No. 1-Vent Culvert size (3.00X3.00)m of Samsul Islam Doctor Bari fornt site word no. 09 Under Betagi Pourashava District: Barguna.
C) Construction of 01 No. 1-Vent Culvert size (2.00X2.00)m of Sharif Bari fornt site word no. 02 Under Betagi Pourashava District: Barguna.
D) Construction of 01 No.1-Vent Culvert size (2.00X2.00)m of Prashanda's Danga word no 03 Under Betagi Pourashava District: Barguna.
E) Construction of 01 No. 1-Vent Culvert size (3.00x3.00)m of Habib Comisonar House Khal fornt site word no. 03 Under Betagi Pourashava District: Barguan.
F) Construction of 01 No. 1-Vent size (2.00x2.00)m of Dilip House fornt site word no. 02 Under Betagi Pourashava District: Barguna.
|
UIIP
|
betagi
|
|
|
14.00
|
100
|
79.07
|
M/S Hakkanur Entr.
|
79.00
|
11/09/2021
|
|
11/08/2022
|
100
|
79.00
|
100
|
29/09/2022
|
|
441
|
UIIP-BC/PCO/W-406
|
A) Construction of RCC Drain from (i) Natun Dack Bangla to Khal (Ch:0.00-125.00m) ward no. 06 (ii) Old Drain to Govt Collage (Ch:0.00-150.00m) ward no 05 (iii) Montu Khan’s House to Khal par (Ch:0.00-150.00m) word no 06 Under Betagi Pourashava District: Barguna.
B) Construction of RCC Drain from (i) RCC Road to boro Khal via Paltu Comisoner Home (Ch 0.00-40.00m) word no 07 (ii) RCC Road to boro Khal via Babul Kazi Home Ch. 0.00-36.00mm word no 07 (iii) Sankor Home to Hospital Gate (Ch. 0.00-170.00m) word no 07 (iv) Nazmul Huda home to boro Khal (Ch. 0.00-250.00m) word no 05 (v) Sabdar Chand Munsir Mazar to Faysal Home (Ch.0.00-168.00m) word no 08 (vi) RCC Road to baro Khal via Manik Roy Home (Ch. 0.00-250.00m) word no. 07 Under Betagi Pourashava District: Barguna.
|
UIIP
|
betagi
|
|
|
0.00
|
100
|
171.70
|
M/S Khan Entr.
|
171.69
|
09/11/2021
|
|
08/11/2022
|
100
|
171.69
|
100
|
29/09/2022
|
|
442
|
UTMIDP- BAMN/ BARG/ WR-29
|
1. Improvement of RCC road from Hospital BC road at Ali house to Hamayet Molla house via ponu Member house from Ch. 0.00m-900.00m under Bamna Upazila, District: Barguna. (Road ID:504194131) 2. Improvement of RCC road from Bamna Khaopatua BC to Baitul Karim Mosque BC road at Ch. 0.00m- 600.00m under Bamna Upazila, District: Barguna. (Road ID:504194057)
|
UTMIDP
|
bamna
|
|
1.50
|
|
|
124.86
|
M/S Ebad Construction & Tahidul Basher Kabir (JV), Mathbaria, Pirojpur
|
101.35
|
29/07/2019
|
|
30/06/2020
|
40
|
|
|
08/12/2019
|
|
443
|
UTMIDP-BAMN/ BARG/ WD-10
|
Comstruction of RCC Drain at Bamna Bazar (Total Length 705.00m) under Bamna Upzila, District: Barguna.
|
UTMIDP
|
bamna
|
504193001
|
0.71
|
|
|
106.81
|
M/S Poly Construction, College Road, Barguna
|
90.94
|
29/07/2019
|
|
07/06/2020
|
20
|
|
|
08/12/2019
|
|