LGED BARGUNA , District Scheme Details

Project Name
Upazila

District Scheme Details

SL No. Package No. Package Name Project Name Upazila Name Road ID Length of Road (Km) Length of Bridge (M) Building Qauntity (No) Estimated Amount (Lac) Name of Contractor Contract Amount (Lac) Date of Contract Date of Commencement Date of Completion Physical Progress (%) Financial Progress (Amt) Financial Progress (%) Date of Progress Update Remarks
1 BDIRWSP/BAR/AMT/DW-03 Widening & Strengthening of Amtali (AK High school) RHD- Gazipur GC via Talukder hat road at Ch. 740-3200m under Amtali Upazila, District-Barguna. Road ID No: 504092001. Salvage Materials Cost Tk. 520688.00 BDIRWSP amtali 504092001 2.46 489.46 Barendra Construction Ltd. H-146, Shaheb Bazar, Ghoramara; Boalia PS; Rajshahi-6100; Bangladesh 440.51 0 07/10/2024
2 BDIRWSP/BAR/AMT/DW-04 Widening & Strengthening of Amtali (AK High school) RHD- Gazipur GC via Talukder hat road at Ch. 3200-3900m & Ch. 6000-7700m and 275.00m RCC Road on Talukder Bazar (Ch. 7000-7275m) under Amtali Upazila, District-Barguna. Road ID No: 504092001. Salvage Materials Cost Tk. 560448.00 BDIRWSP amtali 504092001 2.40 486.60 Barendra Construction Ltd. H-146, Shaheb Bazar, Ghoramara; Boalia PS; Rajshahi-6100; Bangladesh 437.94 0 07/10/2024
3 BDIRWSP/BAR/AMT/DW-05 Widening & Strengthening of Amtali (AK High school) RHD- Gazipur GC via Talukder hat road at Ch. 7700-10200m under Amtali Upazila, District-Barguna. Road ID No: 504092001. Salvage Materials Cost Tk. 899836.00 BDIRWSP amtali 504092001 2.50 466.04 Barendra Construction Ltd. H-146, Shaheb Bazar, Ghoramara; Boalia PS; Rajshahi-6100; Bangladesh 419.44 0 07/10/2024
4 BDIRWSP/BAR/AMT/DW-06 Widening & Strengthening of Amtali (AK High school) RHD- Gazipur GC via Talukder hat road at Ch. 10200-12350m under Amtali Upazila, District-Barguna. Road ID No: 504092001. Salvage Materials Cost Tk. 818888.00 BDIRWSP amtali 504092001 2.15 398.03 Barendra Construction Ltd. H-146, Shaheb Bazar, Ghoramara; Boalia PS; Rajshahi-6100; Bangladesh 358.22 0 07/10/2024
5 BDIRWSP/BAR/BAM/DW-17 Widening & Strengthening of Bamna H/Q- Bukabunia UP-Dawatala GC road at Ch. 7000-12650m and 166.00m RCC Road (Ch. 8364-8530m) including 01 No. 1.50mx1.50m RCC Box Culvert at 8426m under Bamna Upazila, District-Barguna. Road ID No: 504192008. Salvage Materials Cost Tk. 1174044.00 BDIRWSP bamna 504192008 5.82 1252.22 Barendra Construction Ltd. H-146, Shaheb Bazar, Ghoramara; Boalia PS; Rajshahi-6100; Bangladesh 1127.00 0 08/10/2024
6 BDIRWSP/BAR/SAD/DW-12 Widening & Strengthening of Barguna UZ HQ- Patharghata UZ HQ Via Parirkhal GC Road (Sadar Part) road at Ch. 13000-15000m under Sadar Upazila, District-Barguna. Road ID No: 504282004. Salvage Materials Cost Tk. 463420.00 BDIRWSP barguna-s 504282004 2.00 349.81 Barendra Construction Ltd. H-146, Shaheb Bazar, Ghoramara; Boalia PS; Rajshahi-6100; Bangladesh 314.83 0 08/10/2024
7 BDIRWSP/BAR/BAM/DW-16 Widening & Strengthening of Bamna H/Q- Bukabunia UP-Dawatala GC road at Ch. 0.00-7000m and 215.00m RCC Road (Ch. 4600-4815m) including 01 No. 1.50mx1.50m RCC Box Culvert at 6116m and 02 Nos. 2.50mx2.50m RCC Box Culvert at 775m & 2744m 01 No. 4.00mx4.00m RCC Box Culvert at 6005m under Bamna Upazila, District-Barguna. Road ID No: 504192008. Salvage Materials Cost Tk. 1543600.00 BDIRWSP barguna-s 504192008 7.22 1638.64 Barendra Construction Ltd. H-146, Shaheb Bazar, Ghoramara; Boalia PS; Rajshahi-6100; Bangladesh 1474.78 0 08/10/2024
8 BDIRWSP/BAR/SAD/DW-15 Widening & Strengthening of Barguna UZ HQ- Patnarghata UZ HQ Via Parirkhal GC Road (Sadar Part) road at Ch.20000-22680mm, under Sadar Upazila, Distnct-Barquna. Road ID No. 504282004, Salvage Materials Cost Tk. 972468.00 BDIRWSP barguna-s 504282004 481.56 JAKAULLAH AND BROTHERS LIMITED, Molla Tower, Thana Mour, Jibannagar, Chuadanga 433.41 0 08/10/2024
9 BDIRWSP/BAR/SAD/DW-07 Widening & Strengthening of Barguna UZ HQ- Patharghata UZ HQ Via Parirkhal GC Road (Sadar Part) road at Ch. 0.00-2500m under Sadar Upazila, District-Barguna. Road ID No: 504282004. Salvage Materials Cost Tk. 635657.00 BDIRWSP barguna-s 504282004 2.50 491.85 Barendra Construction Ltd. H-146, Shaheb Bazar, Ghoramara; Boalia PS; Rajshahi-6100; Bangladesh 442.67 0 07/10/2024
10 BDIRWSP/BAR/SAD/DW-08 Widening & Strengthening of Barguna UZ HQ- Patharghata UZ HQ Via Parirkhal GC Road (Sadar Part) road at Ch. 2500-5468m including 01 No. 1.00mx1.00m RCC Box Culvert at 5210m and 01 No. 2.00mx2.00m RCC Box Culvert at 2540m under Sadar Upazila, District-Barguna. Road ID No: 504282004. Salvage Materials Cost Tk. 1064204.00 BDIRWSP barguna-s 504282004 2.97 487.87 Barendra Construction Ltd. H-146, Shaheb Bazar, Ghoramara; Boalia PS; Rajshahi-6100; Bangladesh 439.08 0 07/10/2024
11 BDIRWSP/BAR/SAD/DW-09 Widening & Strengthening of Barguna UZ HQ- Patharghata UZ HQ Via Parirkhal GC Road (Sadar Part) road at Ch. 5468-8300m under Sadar Upazila, District-Barguna. Road ID No: 504282004. Salvage Materials Cost Tk. 415715.00 BDIRWSP barguna-s 504282004 2.83 495.34 Barendra Construction Ltd. H-146, Shaheb Bazar, Ghoramara; Boalia PS; Rajshahi-6100; Bangladesh 445.81 0 07/10/2024
12 BDIRWSP/BAR/SAD/DW-10 Widening & Strengthening of Barguna UZ HQ- Patharghata UZ HQ Via Parirkhal GC Road (Sadar Part) road at Ch. 8300-10900m including 01 No. 1.00mx1.00m RCC Box Culvert at 9759m under Sadar Upazila, District-Barguna. Road ID No: 504282004. Salvage Materials Cost Tk. 566365.00 BDIRWSP barguna-s 504282004 2.60 480.95 Barendra Construction Ltd. H-146, Shaheb Bazar, Ghoramara; Boalia PS; Rajshahi-6100; Bangladesh 432.86 0 07/10/2024
13 BDIRWSP/BAR/SAD/DW-11 Widening & Strengthening of Barguna UZ HQ- Patharghata UZ HQ Via Parirkhal GC Road (Sadar Part) road at Ch. 10900-13000m under Sadar Upazila, District-Barguna. Road ID No: 504282004. Salvage Materials Cost Tk. 460583.00 BDIRWSP barguna-s 504282004 2.10 359.25 Barendra Construction Ltd. H-146, Shaheb Bazar, Ghoramara; Boalia PS; Rajshahi-6100; Bangladesh 323.33 0 07/10/2024
14 BDIRWSP/BOR/PAT/DW-01 Widening & Strengthening of Patharghata GC (Ghutabacha RHD)-Kalmegha GC (UZR) road at Ch. 0.00-4165m including 03 Nos. 2.00mx2.00m RCC Box Culvert at 517m, 1127m & 2402m and 01 No. 2-vent 4.00mx4.00m RCC Box Culvert at 2825m under Patharghata Upazila, District-Barguna. Road ID No: 504852002. Salvage Materials Cost Tk. 5004691.00 BDIRWSP patharghata 504852002 4.17 803.69 M/S Abul Kalam Azad Muslimpara, Patuakhali Sadar, Patuakhali 723.32 0 07/10/2024
15 BDIRWSP/BOR/PAT/DW-02 Widening & Strengthening of Patherghata HQ-Harinbaria Badurtala Bazar (UNR) road at Ch. 0.00-4615m including 01 No. 2-vent 4.00mx4.00m RCC Box Culvert at 1636m under Patharghata Upazila, District-Barguna. Road ID No: 504853001. Salvage Materials Cost Tk. 945868.00 BDIRWSP patharghata 504853001 4.62 747.43 M/S Abul Kalam Azad Muslimpara, Patuakhali Sadar, Patuakhali 672.69 0 07/10/2024
16 BDIRWSP/BAR/TAL/DW-18 Widening & Strengthening of Taltali GC- Bogir hat GC via Taltali Digree College road at Ch. 0.00-9700m under Taltali Upazila, District-Barguna. Road ID No: 504872004. Salvage Materials Cost Tk. 2122400.00 BDIRWSP Taltali 504872004 9.70 1615.49 Barendra Construction Ltd. H-146, Shaheb Bazar, Ghoramara; Boalia PS; Rajshahi-6100; Bangladesh 1453.94 0 08/10/2024
17 BDRIDP/BRG/AMT/CCA-Rd/01 (Tender ID 72101) Improvement of road by BC from Angulkata GPS cum cyclone shelter-North Angulkata GPS & Lunch ghat via Khekuani Bazar Road at ch 1900m-4200m.Effective length 2270m and construction of 1 No0.925mx1.20m U-Drain(L=8m) at ch 3250m. BDRIDP amtali 2.30 131.06 M/S Mithun Traders 109.43 01/01/2017 06/11/2017 0 Final bill paid
18 BDRIDP/BRG/PAT/CCA-Rd/04(ID-146855) Improvement of Amratala GPS Cum Cyclone Shelter Connecting road Kelmegha UP-Mesherpur Bazar via Paschim Amratala GPS road. DPP ID No-504855062 New ID No-504853020 a) Earthwork Ch. 00-1000m. b) Bituminous Carpeting Ch. 00-1000m. c) U-Drain at Ch. 112.00m, BDRIDP amtali 1.00 69.86 M/S KK Enterprise 68.92 25/02/2018 10/07/2018 0 WBM completed
19 BDRIDP/BRG/ AMT/CCA-Rd/02(ID-162870) Improvement of road Khaliyan Bus-Stand to H/O Hasem Mridha via Valoybunia GPS & Nilgonj High School Road by BC From Ch. 00m to 1450m Including structure under Amtali Upazila, District: Barguna [Road ID-504094087] BDRIDP amtali 1.45 91.65 Md. Abul Kalm Azad 89.63 30/10/2018 0 WBM on going
20 BDRIDP/BRG/AMT/UZ-St/01 Construction of 21.00n RCC Girder Bridge on Amtali Mohiskata R&H - Kalagasia Kaserhat GC via Gulishakhali Bazar at ch 3790m under Amtali Upazila.Barguna. BDRIDP amtali 155.45 Md.Enayet Hossain 147.64 14/05/2018 14/01/2019 0 Materials Mobilized.Electric pole need shifted.
21 BDRIDP/BRG/BET/UZ-Ew/03 Resectioning of road from Niamati - Deshanterkathi via DC Hat Ch. 3900-5363m BDRIDP amtali 1.46 4.94 LCS Hemayet 4.94 09/06/2015 30/08/2015 0 Final
22 BDRIDP/BRG/AMT/CCA-Ew/01 Improvement of road from Bamna Bukabunia road to gafur Master House at WAPDA road from ch 0.00-600.00m BDRIDP amtali 0.60 1.81 Mrs Beauty Begum 1.81 20/06/2016 20/06/2016 0 Final
23 BDRIDP/BRG/AMT/CCA-Ew/02 Improvement of road by Earth workfrom Amtali-Moshiskata RHD-Kalagasia Khasher Hat GC via Gulishakhali Bazar at ch 7500m-7900m under Amtali,Barguna. BDRIDP amtali 0.40 3.70 Md.Shahidul Islam 0.00 01/09/2016 30/03/2017 0 Final
24 BDRIDP/BRG/AMT/CCA-Ew/03 Improvement of road by Earth workfrom Amtali-Moshiskata RHD-Kalagasia Khasher Hat GC via Gulishakhali Bazar at ch 7900m-8400m under Amtali,Barguna. BDRIDP amtali 0.50 3.14 Md Shohel Musulli 0.00 01/09/2016 30/03/2017 0 Final
25 BDRIDP/BRG/AMT/CCA-Ew/04 Improvement of road by Earth workfrom Amtali-Moshiskata RHD-Kalagasia Khasher Hat GC via Gulishakhali Bazar at ch 8400m-8843m under Amtali,Barguna. BDRIDP amtali 0.44 3.23 Md.Shahin Gazi 3.23 01/09/2016 30/03/2017 0 Final
26 BDRIDP/BRG/SDR/UZ-Ew/01(Group-2) Improvement of road from Barguna - Lakurtala -Dhupati - Chandukhali GC at ch 9350m-10025m BDRIDP amtali 0.68 4.16 Abdus salam 4.16 30/06/2017 0 Final
27 BDRIDP/BRG/AMT/UZ-EW/01 Resectioning of road from Gazipur GC-Badura GC via Atharogasia UP Ch.3600m-4220m BDRIDP amtali 0.62 4.98 Md.Shahajahan Fakir 4.98 21/11/2017 21/05/2018 0 Final
28 BDRIDP/BRG/AMT/UZ-EW/02 Resectioning of road from Gazipur GC-Badura GC via Atharogasia UP Ch.4200m-4850m BDRIDP amtali 0.65 4.76 Md.Rubel chawkider 4.76 21/11/2017 21/05/2018 0 Final
29 BDRIDP/BRG/AMT/UZ-EW/03 Resectioning of road from Gazipur GC-Badura GC via Atharogasia UP Ch.5860m-6285m BDRIDP amtali 0.43 4.52 Md.Shahajahan 4.52 28/01/2018 30/04/2018 0 Final
30 BDRIDP/BRG/BAM/CCA-St/01 Construction of 1 No 1.50m*1.50m RCC Box culvert on Madha Kakchira GPS cum Cyclone Shelter- Cotto Bhaijora GPS- Khuchnichora GPS cum Cyclone Shelter road at Ch. 1350m (Road ID-504194011) Upazila: Bamna , District: Barguna. BDRIDP bamna 4.14 M/S Homaira construction 3.35 01/06/2015 30/09/2016 0 Final bill paid
31 BDRIDP/BRG/BAM/UN-Rd(R)/01 Rehabilitation of road from Bukabunia Head Quarter- Amua GC via Laxmipura Madrasha road by BC from Ch. 1000-3000m with 1.50m*1.50m Box Culvert at Ch. 1400m (Road ID-504193004) Upazila: Bamna , District: Barguna. BDRIDP bamna 102.01 M/S Ahmed Still Industries 85.70 31/05/2015 30/06/2016 0 Final bill paid
32 BDRIDP/BRG/BAM/CCA-Rd/02(Tender ID-23932) Improvement of road from Bamna Bukabunia road to gafur Master House with 2Nos U-Drain at ch 10m & 300m. BDRIDP bamna 34.18 M/S Rudra Enterprise 28.36 18/04/2016 18/10/2016 0 Final bill paid
33 BDRIDP/BRG/BAM/CCA-RdR/01 (Tender ID 103724) Rehabilitation of road from Maidha Kakchira GPS cum Cyclone Shelter- Cotto Bhaijora GPS- Khuchnichora GPS cum Cyclone Shelter road from Ch. 930-2100m (Road ID-504194011 Salvage amount Tk 688913.00) Upazila: Bamna , District: Barguna. BDRIDP bamna 1.17 63.02 M/S Poly construction 56.72 01/09/2017 28/02/2018 0 WBM on going
34 BDRIDP/BRG/BAM/CCA-Rd/03 Improvement of Road from Tulatala BC road to Bebazia khal GPS cum Cyclone Shelter via Dhalu Sikder House from Ch. 00-500m under Bamna Upazila District Barguna Road ID-504194051 Salvage amount Tk. 27776 BDRIDP bamna 0.50 25.23 M/S Kohinoor Enterprise 22.70 27/09/2017 27/03/2018 0 Final bill paid
35 BDRIDP/BRG/BAM/CCA-Rd/04 Improvement of road from Ramna dawatala battala Culvert- Wapda via Poschim Golaghata GPS Cum Cyclone Shelter at ch 0.00-715m and Construction of 05Nos U-Drain on same road at ch 40m,250m450m,593m & 682m under Bamna Barguna BDRIDP bamna 0.72 51.85 M/S Atom Enterprise 49.26 07/03/2018 07/09/2018 0 WBM on going
36 BDRIDP/BRG/ BAM/UN-Rd/02(ID-162871) Improvement of Bamna UP Office-Gudhighata Bazar via Kuchnichora GPS Ramna UP Office-Gudhighata Bazar via Kuchinichora GPS Road by BC From Ch. 1370m to 2370m Earthen from CH. 1000m to 2000m & 1 Nos U-Drain at Ch. 1940m under Bamna Upazila, District: Bargun BDRIDP bamna 1.00 59.86 M/S Khankaker Sahin Ahmed.Paschim Goalchatmot. Faridpur 53.87 14/05/2018 14/11/2018 0 AS completed. WBM on going
37 BDRIDP/BRG/BAM/CCA-Rd/05(ID-162872) Improvement of Uttar Kakchira Bazar Chalavanga Launch Ghat via Gudhighata Adarsha GPS cum Cyclone Shelter Road by BC From Ch. 00m to 1000m under Bamna Upazila, District: Barguna [Road ID-504194080] BDRIDP bamna 0.00 59.19 M/S Khankaker Sahin Ahmed.Paschim Goalchatmot. Faridpur 53.27 14/05/2018 14/11/2018 0  
38 BDRIDP/BRG/ BAM/UN-Rd/03(ID-162873) Improvement of Dawatala UP Office-Uttar Kakchira Bazar via Nobogram GPS Road by BC From Ch. 00m to 1000m under Bamna Upazila, District: Barguna [Road ID-504193012] (Salvage amount Tk 426251.00). BDRIDP bamna 1.00 73.79 M/S Khankaker Sahin Ahmed.Paschim Goalchatmot. Faridpur 66.41 21/05/2018 21/11/2018 0 AS completed. WBM on going
39 BDRIDP/BRG/ BAM/GHT/01 Construction of Gfhat at Bukabunia Bazar BDRIDP bamna 30.30 M/S Arif & Asif Construction. Sadar road Barguna. 30.19 27/05/2018 27/09/2018 0  
40 BDRIDP/BRG/BAM/CCA-Rd/06 Improvement of road Chalitabunia Bazar Bukabunia UP Dr. Lublu House.ID No-504194004 (a) Earth wark from Ch. 1739m-3174m. (b) Carpeting BC from Ch. 1739m-3174m. (c) Construction of 1 Nos 4.00mx3.00m & 1 Nos 1.5mX1.5m Box Culvert at Ch. 2616m & 2424m. 2 Nos BDRIDP bamna 1.44 123.35 M/S Akon Trading Hospital Road ,Bamna, Barguna 117.18 13/08/2018 13/02/2019 0 pile casting for Palisading work on going.box cutting on going
41 BDRIDP/BRG/BAM/CCA-Ew/01 Re-section of road from Bamna Bukabunia road-Gafur Master Hiouse at RAPDA road by Earthen at ch 00.00-600.00m under Bamna,Barguna BDRIDP bamna 0.60 1.81 LCS Mrs. Bauety Begum 1.81 03/06/2016 20/06/2016 0 Final
42 BDRIDP/ PAT/SAD/ CCA-Rd/01 Imp. Of road from Moukaran UNR road start Purbo Talikhali Mazibar dokan-North side Kafulabunia khal-Daritaluk P/S & H/S road via Abdul Latif Howlader bari road by HBB from ch.00-1500m. BDRIDP bamna 1.50 35.00 Md. Shafiqur Rahman 30.80 0 FBP
43 BDRIDP/ PAT/SDR/ CCA-RD/02 Improvement of road from Pangashia UP-Gazipur R&H (Bus Stand)-Jamla road upto Sreerampur Sluice Gate road by BC from ch.4228-5724m BDRIDP bamna 1.50 76.41 M/S. Selim Stores 71.83 0 FBP
44 BDRIDP/ PAT/SAD/ CCA-Rd/03 Imp. Of road from Low Kathi Officer hat to Kaler hat via Kismat Moukarn Primary School road by BC from ch.1400-3116m BDRIDP bamna 1.72 79.96 Md. Jasim Uddin Khan 71.84 0 FBP
45 BDRIDP/ PAT/SAD/ CCA-Rd/04 Imp. Of road from Moukaran UZR road via Jabber Sikder bari via Fakir Bari-Rashid Kazi Bari via Muktijodda Yousuf Kazi bari-Moukarn Bazar Gazipur road by HBB from ch.00-1215m BDRIDP bamna 1.22 34.64 M/S. Hima Bricks 29.81 0 FBP
46 BDRIDP/PAT/SAD/CCA-Rd/07 Improvement of road from Showla Baily Bridge-Full Sharif Bazar via Mazi Bari-pachim Vaila Madrasha-Vaila RNGPS road By HBB from Ch.3000-4200m with 1 No U-Drain (625mmx625mm) at Ch.4200m (ID No. 578954111) BDRIDP bamna 1.20 40.09 M/S. Hima Bricks 39.97 0 FBP
47 BDRIDP/PAT/SAD/CCA-Rd/05 Improvement of road from Jainkati UP-Bhuria Bazar UNR to Pathan Bari Mosque via Abdul Malek Mredha Bari by HBB form ch. 00-550m (ID No. 578955341) BDRIDP bamna 0.55 11.06 M/S. Hima Bricks 10.12 0 FBP
48 BDRIDP/PAT/SAD/CCA-Rd/06 Improvement of road from Islampur Madrasha to BWDB Embankment via Rafiqul Islam Moulana Bari by HBB form ch. 00-600m (ID No. 578955342) BDRIDP bamna 0.60 14.75 M/S. Hima Bricks 12.69 0 FBP
49 BDRIDP/ PAT/SAD/ UN-Rd/01 Imp. Of road from Badarpur UP-Lowkati UP via Skandar Rari Bari road by HBB from ch.4955-5990m with 1No U-Drain at ch.5779m BDRIDP bamna 1.04 32.00 M/S. Hima Bricks 27.62 0 FBP
50 BDRIDP/ PAT/SAD/ UZR-Rd/01 Imp. Of road Patuakhali-Brisal R&H to Dumki Upazila via Moukaran GC (Sadar part) road by BC from ch.3255-5035m BDRIDP bamna 1.78 126.67 M/S. Nazmul Shahdat Traders 110.77 0 FBP
51 BDRIDP/ PAT/SDR/ UN-Rd/02 Improvement of road from Auliapur UP-Badura GC via Dhakkin Badura GPS (Dhakkin Badura GPS cum Cyclone Center) road (ID No. 578953035) by BC from Ch. 3500m-4500m under Patuakhali Sadar, Patuakhali. BDRIDP bamna 1.00 114.23 M/S. Lutfa Construction 93.02 0 FBP
52 BDRIDP/ PAT/SAD/ UZ-Rd/02 Improvement of road from Khaser hat GC to Bottolbunia GC via Hazikhali Bazar road by Earth work (Ch. 3805-4805m) BDRIDP bamna 1.00 66.53 M/S. Mohiuddin Ahmed 58.80 0 FBP
53 BDRIDP/PAT/SAD/UZ-Rd/03 Improvement of road from Patuakhali Barisal R&H (Moukaran Bridge)-Dumki UZHQ via Moukaran GC Road (Sadar Part) from Ch. 5035m-6965m (Road ID No. 578952007) BDRIDP bamna 1.93 131.69 M/S. Shakil Enterprise 104.92 0  
54 BDRIDP/PAT/SDR/UZ-Rd/04 Improvement of Road from Patuakhali-Betagi R&H Pairakunja Bazar Kakrabunia GC via Officer hat Sadar Part from Ch. 3200m-5200m including 3 Nos 1.50mx1.50m RCC Box Culvert at Ch. 3615m 3700m & 4840m ID No. 578952011 BDRIDP bamna 2.00 155.83 M/S. Nazmus Shahdat Traders 154.36 0 FBP
55 BDRIDP/PAT/SDR/CCA-Rd/08 Improvement of road From Khejurtala Bazar-Dhankhali Bazar via Dakurbunia GPS at Ch. 0.00-1000.00m including 2Nos. 1.50mX1.50m RCC Box Culvert at Ch. 220.00m & 415.00m (ID No. 578954096) BDRIDP bamna 1.00 68.65 Md. Gius Uddin 61.79 0  
56 BDRIDP/PAT/SDR/CCA-Rd/09 Improvement of road From Sreerapur Bazar-Munshir hat via Parkartikpasha GPS at ch. 765.00m-2300.00m including 1No. 1.50mX1.50m RCC Box Culvert at Ch. 1250.00m (ID No. 578954052) BDRIDP bamna 1.54 96.81 Md. Firoz 91.01 0  
57 BDRIDP/PAT/SDR/CCA-Rd/10 Improvement of road From (UZR) Fadea Bazar-(UNR) Gadur Bazar ch. 0.00-1300.00m including 1No. 1.50mX1.50m RCC Box Culvert at Ch. 1000.00m (ID No. 578954156) BDRIDP bamna 1.30 85.19 M/S. Soma Enterprise 77.47 0  
58 BDRIDP/PAT/SAD/UZ-Rd/05 Improvement of BC road From Khasher Hat GC - Bottlebunia GC via Hazikhali Hat at Ch. 2450m-3805m including 01 No. 1.00mx1.00m RCC Box Culvert at ch. 3053m. (ID No. 578952006) BDRIDP bamna 1.36 109.33 Abdul Kader Khan 103.77 0  
59 BDRIDP/PAT/SAD/CCA-Rd/11 Improvement of BC road From UZR (Hazikhali Mohammadia Madrasha) to UNR (Atahar Pada bari) - Iron Bridge road at Ch. 00m-1830m including 02 Nos. 1.50mx1.50m RCC Box Culvert at ch. 510m & 1380m. (ID No. 578954168) BDRIDP bamna 1.83 116.16 Md. Bashir Uddin 116.06 0  
60 BDRIDP/PAT/SAD/UZ-Rd/06 Improvement of Patuakhali UZHQ-Muradia GC via Sreerampur Bazar (Sadar Part) at Ch. 6785m-8785m. Including 04 Nos 1.50mX1.50m, 01 No. 3.00mX3.00m (2-vent) RCC Box Culvert at Ch. 6945m, 7565m 7835m, 8495m & 7357m BDRIDP bamna 2.00 159.35 Md. Manebur Rahman 154.45 0  
61 BDRIDP/ PAT/SAD/ UZR-ST/01 Const.of 1No 4.00mx4.00m RCC Box Culvert on Patuakhali-Barisal R&H to Dumki Upazila via Moukaran GC (Sadar part) road at ch.4715m. BDRIDP bamna 22.31 M/S. Gazi Enterprise 17.52 0 FBP
62 BDRIDP/ PAT/SAD/ CCA-ST/01 Const. of 3.00mx3.00m RCC Box culvert on Moukarn UNR road start Purbo Talikhali Mazibar dokan-North side Kafulabunia khal-daritaluk P/S & H/S road via Abdul Latif Howlader bari road at ch.1140m BDRIDP bamna 10.62 M/S. Masud & Brothers 7.78 0 FBP
63 BDRIDP/ PAT/SDR/ CCA-St/02 Const. of 1 No. 3.00mX1.00m Box culvert on Pangasha UP-Gazipur R&H (Bus Stand)-Jamla road upto Sreerampur Sluice Gate road at ch.4380m. BDRIDP bamna 9.79 M/S. Gazi Enterprise 7.29 0 FBP
64 BDRIDP/ PAT/SAD/ CCA-St/03 Const. of 1 No 3.00mx3.00m Box Culvert & 03 Nos U-Drain on Low Kathi Officer hat to Kaler hat via Kismat Moukaran Primary School road at ch.2630m, 1792m,2309m & 2976m. BDRIDP bamna 12.69 M/S. Gazi Enterprise 9.83 0 FBP
65 BDRIDP/ PAT/SDR/ UN-St/01 Construction of 02 Nos. 3.00mx3.00m RCC Box Culvert on Auliapur UP-Badura GC via Dhakkin Badura GPS (Dhakkin Badura GPS cum Cyclone Center) road at Ch. 3600m & 4150m (ID No. 578953035) under Patuakhali Sadar, Patuakhali. BDRIDP bamna 28.39 M/S. Soma Enterprise 19.42 0  
66 BDRIDP/PAT/SAD/UZ-St/02 Construction of 2Nos 1.00mX1.00m RCC Box Culvert on Khaser Hat GC via Hazikhali Bazar road at Ch. 4285m & 4450m (ID No. 578952006) BDRIDP bamna 0.00 M/S. Talukder Enterprise 4.37 0 FBP
67 BDRIDP/PAT/SAD/UZ/St-03 Construction of 2 Nos. 3.00mx3.00m, 2 Nos. 2.00mx2.00m & 2 Nos. 1.50mx1.50m RCC Box Culvert on Patuakhali Barisal R&H (Moukaran Bridge)-Dumki UZHQ via Moukaran GC Road (Sadar Part) at Ch. 5865m, 6135m, 6592m, 6435m, 5185m & 5499m. (Road ID No. 578952007) BDRIDP bamna 52.98 Md. Gius Uddin 35.96 0  
68 BDRIDP/PAT/SAD/CCA-St/04 Construction of 2-Vent 3.00mx3.00m RCC Box Culvert on Auliapur UP-Badura GC via Dakkhin Badura GPS at Ch. 6500m (Auliapur UP-H/O Bonda Ali Miah South Badura Bazar) BDRIDP bamna 19.38 Md. Mahafuz Khan 17.44 0  
69 BDRIDP/PAT/SAD/UZ-St/04 Construction of 42.06m RCC Girder Bridge on Patuakhali Barisal RHD (Moukaron Bridge)-Dumki UZHQ via Moukaran GC (Sadar Part) at Ch. 3282m (Road ID: 578952007) BDRIDP bamna 268.58 M/S. Amir Engineering Corporation-M.M. Builders & Engineers Ltd.-M/S. Niaz Traders-JV 241.72 0  
70 BDRIDP/BRG/SDR/UZ-St/01 Construction of 72.00n Long RCC Girder Bridge on Barguna - Fuljhuri GC- Kakchira GC road Adjacent to Barguna Fish Market at ch 50.00m under Barguna Sadar Upazila.Barguna. BDRIDP barguna-s 359.91 MSE-SMS(JV) 403.93 08/09/2016 30/01/2018 95 Block setting incompleted
71 BDRIDP/BRG/SAD/CCA-Rd/01 (Tender ID 72101) Improvement of road from Barguna - Lakurtala -Dhupati - Chandukhali GC at ch 8400m-10025m with construction of 2 Nos small structure U-Drain(625mmx900mm) at ch 8625m & 9350m BDRIDP barguna-s 1.63 114.89 M/S Sonali Enterprise 101.21 07/02/2017 07/02/2018 100 Final Bill submitted
72 BDRIDP/BRG/SAD/CCA-Rd/01 (188387) Improvement of Kumarkhali GPS Connecting Approach Road Bawalker GCCR- Kumarkhali Jame Mosque Road at Ch. 00.00m to 1000.00m under Barguna Sadar Upazila District Barguna Road ID- 504285029 Salvage amount Tk. 605472.00 BDRIDP barguna-s 1.00 63.49 M/S RS Buisness Center 60.32 13/07/2018 13/01/2019 50 WBM on going
73 BDRIDP/BRG/SDR/UZ-St/04 (190364) Construction of 15.00m Long RCC Girder Bridge on Katherpul RHD-Kadamtala Hat-Baikalin Hat-Ayla GC road at Ch. 4364.00m Road ID- 504282010 under Barguna Sadar Upazila Barguna District. BDRIDP barguna-s 137.80 M/S RS Buisness Center 130.91 13/07/2018 13/01/2019 30 Pile casting completed
74 BDRIDP/BRG/SDR/UZ-St/02(190361) Construction of 36.00m Long RCC Girder Bridge on Katherpul RHD-Kadamtala Hat-Baikalin Hat-Ayla GC road at Ch. 6455.00m Road ID -504282010 under Barguna Sadar Upazila Barguna District. BDRIDP barguna-s 218.00 M/S Khan Enterprise & M/S Poly Construction 209.07 13/08/2018 13/04/2019 0  
75 BDRIDP/BRG/SDR/UZ-St/03(190362) Construction of 20.00m Long RCC Girder Bridge on Barguna-Lakurtala-Dhapati-Chandukhali GC Road Amtali-Kakchira RHDLakurtala-Chandukhali GC via Andarmanik Road Sadar Part at Ch. 11580.00m Road ID -504282007 under Barguna Sadar Upazila Barguna District. BDRIDP barguna-s 230.59 Quashem Construction & M/S polly Store(JV).Town Kalikapur, patuakhali 220.98 19/08/2018 19/08/2019 5 Materials Mobilization
76 BDRIDP/BRG/SAD/CCA-St/05 Construction of 29.00m PSC Girder Bridge on Katherpol RHD - Kadamtala Hat - Baikalin Hat - Ayla GC road at ch 3215m under Barguna sadar,Barguna. Road ID- 504282010 BDRIDP barguna-s 0.00   0.00 0 2nd Stage TER sent to H/Q
77 BDRIDP/BRG/SAD/UZ-St/06 (234465) Construction of Retaining wall & Under pass way of 72.00n Long RCC Girder Bridge Approach on Barguna - Fuljhuri GC- Kakchira GC road Adjacent to Barguna Fish Market at ch 50m ID No-504282003 (a) retaining wall 84.00m (b)guide wall 8.40m (c 2Nos Culvert BDRIDP barguna-s 75.95 M/S RS Buisness Center 72.15 0 NOA Issued
78 BDRIDP/BRG/SAD/CCA-Rd/02, (253161) Improvement of Nazimuddin Bari-Kasem Musuli Bari road. ID No-504285074 a Earth wark from Ch. 00 - 1000m. 9b Carpeting DC from at Ch. 00 - 1000m. c Construction of 3 Nos U - Drain at Ch. 400m 580m 800m. BDRIDP barguna-s 73.80   0.00 0 Tender will be received on 10.12.2018
79 BDRIDP/BRG/SAD/CCA-Rd/03, (253162) Improvement of Monosatoli Sluice - Latakata road. ID No-504285078 a Earth wark at Ch. 00 - 1000m. b Carpeting DC from at Ch. 00 - 1000m. c Construction of 2 Nos U - Drain at Ch. 540m 700m. BDRIDP barguna-s 1.00 72.86   0.00 0 Tender will be received on 10.12.2018
80 BDRIDP/BRG/SDR/UZ-Ew/01(Group-1) Improvement of road from Barguna - Lakurtala -Dhupati - Chandukhali GC at ch 8400m-9350m BDRIDP barguna-s 0.95 4.84 Md.Chunnu Miah 4.84 30/06/2017 100 Final
81 BDRIDP/BRG/BET/UZ-Rd/01 Badnikhali GC- Kazirhat GC via west karuna High school road by BC from ch 0.00m-2500.00m under Betagi. BDRIDP barguna-s 2.50 157.76 M/S Khan Enterprise 137.12 07/02/2015 06/02/2016 100 Final bill paid
82 BDRIDP/BRG/BET/UZ-Rd/02 Badnikhali GC- Kazirhat GC via west karuna High school road by BC from ch 2500.00m-3700.00m under Betagi. BDRIDP barguna-s 1.20 73.73 M/S Khan Enterprise 63.39 07/02/2015 18/04/2016 100 Final bill paid
83 BDRIDP/BRG/BET/UZ-St/01 Construction of 2Nos 4.00m*3.30m 2Vent Box culvert on Badnikhali GC- Kazirhat GC via west karuna High school road by BC at ch 2621.00m & 2891.00m under Betagi. BDRIDP barguna-s 35.29 M/S Safi Enterprise 29.46 01/02/2015 01/02/2016 100 Final bill paid
84 BDRIDP/BRG/PAT/UN-Rd/01 Rehabilitation of road from Lemua GC - C&B Bazar(RHD) via Hatempur road by BC from ch 2230.00m-4230.00m(ID NO-504853008) BDRIDP barguna-s 2.00 105.04 Md.Nizam Uddin 104.96 26/04/2015 31/12/2016 100 Final bill paid
85 BDRIDP/BRG/BAM/CCA-St/01 Construction of 1 No 1.50m*1.50m RCC Box culvert on Madha Kakchira GPS cum Cyclone Shelter- Cotto Bhaijora GPS- Khuchnichora GPS cum Cyclone Shelter road at Ch. 1350m (Road ID-504194011) Upazila: Bamna , District: Barguna. BDRIDP barguna-s 4.14 M/S Homaira construction 3.35 01/06/2015 30/09/2016 100 Final bill paid
86 BDRIDP/BRG/BAM/UN-Rd(R)/01 Rehabilitation of road from Bukabunia Head Quarter- Amua GC via Laxmipura Madrasha road by BC from Ch. 1000-3000m with 1.50m*1.50m Box Culvert at Ch. 1400m (Road ID-504193004) Upazila: Bamna , District: Barguna. BDRIDP barguna-s 102.01 M/S Ahmed Still Industries 85.70 31/05/2015 30/06/2016 100 Final bill paid
87 BDRIDP/BRG/BET/UZ-Rd(R)/03 (Tender ID 25642) Rehabilitation of road from Niamati- Deshanterkathi via DC Hat by BC Ch. 3900-5363.00 (Road ID-504472002) Upazila: Betagi , District: Barguna. BDRIDP barguna-s 92.74 M/S Khan Enterprise 83.42 05/08/2015 17/10/2016 100 Final bill paid
88 BDRIDP/BRG/BET/UZ-St/02(Tender ID 25643) Construction of 2 Vent 3.60*4.00m RCC Box Culvert & 1 Nos U-Drain on Niamati -Deshantorkathi via DC Hat road at ch. 4830m & 1020m (Road ID-504472002) Upazila: Betagi , District: Barguna. BDRIDP barguna-s 29.60 Md.Munibur Rahman 23.47 05/08/2015 05/02/2016 100 Final bill paid
89 BDRIDP/BRG/PAT/CCA-Rd(R)/01 (Tender ID-27058) Rehabilitation of road from Jaliaghata Bridge -Apiler Bridge road from Ch. 0.00-1483m (Road ID-504855032) Upazila: Patharghata , District: Barguna. BDRIDP barguna-s 1.48 70.90 M/S Afser & Co. 64.00 20/08/2015 20/08/2016 100 Final bill paid
90 BDRIDP/BRG/PAT/CCA-St/01(Tender ID-25645) Construction of 5 Nos U-Drain and 1 No Box Culvert on Jaliaghata Bridge - Apiler Bridge road at Ch.350m,704m,896m,974m, 1260m,& 528m (Road ID-504855032) Upazila: Patharghata , District: Barguna. BDRIDP barguna-s 9.69 M/S Humaira Construction 7.89 05/08/2015 05/02/2016 100 Final bill paid
91 BDRIDP/BRG/BET/CCA-Rd/01(Tender ID25646) Improvement of road from Betagi-Barguna (UZR/Bango Bandhu Bazar) -Charkhali Wapda Bazar (Bango Bandhu Bazar Paschim Kauna H/S-Kaialghata- Charkhali) road By BC from Ch. 00-1800m(ID No. 504474298) Upazila: Betagi , District: Barguna. BDRIDP barguna-s 1.80 77.06 M/S Humayun Enterprise 65.83 05/08/2015 17/10/2016 100 Final bill paid
92 BDRIDP/BRG/BET/CCA-Rd/02(Tender ID-25647) Improvement of road from Betagi-Barguna (UZR/Bango Bandhu Bazar) -Charkhali Wapda Bazar (Bango Bandhu Bazar Paschim Kauna H/S-Kaialghata- Charkhali) road By BC from Ch. 1800-3425m(ID No. 504474298) Upazila: Betagi , District: Barguna. BDRIDP barguna-s 1.63 77.94 M/S Khan Enterprise 67.72 05/08/2015 17/10/2016 100 Final bill paid
93 BDRIDP/BRG/BAT/CCA-St/01(Tender ID25648) Construction of 4Nos U-Drain & 2Nos 2Vent 3.00X3.50m RCC Box Culvert on Betagi-Barguna (UZR/Bango Bandhu Bazar) -Charkhali Wapda Bazar (Bango Bandhu Bazar Paschim Kauna H/S-Kaialghata- Charkhali) road at ch.55m,638m,2810m,3200m,250m & 3112m (ID No. 504474 BDRIDP barguna-s 26.38 M/S Khan Enterprise 21.63 05/08/2015 05/02/2016 100 Final bill paid
94 BDRIDP/BRG/BAM/CCA-Rd/02(Tender ID-23932) Improvement of road from Bamna Bukabunia road to gafur Master House with 2Nos U-Drain at ch 10m & 300m. BDRIDP barguna-s 34.18 M/S Rudra Enterprise 28.36 18/04/2016 18/10/2016 100 Final bill paid
95 BDRIDP/BRG/AMT/UZ-Rd/01 Improvement of road from Amtali Mohiskata RHD -Kalagasia Khasherhat GC via Gulishakhali Bazar at ch 6843m-8843m BDRIDP barguna-s 2.00 116.84 M/S Mithun Traders 99.32 12/09/2016 20/07/2017 100 Final bill paid
96 BDRIDP/BRG/AMT/CCA-Rd/01 (Tender ID 72101) Improvement of road by BC from Angulkata GPS cum cyclone shelter-North Angulkata GPS & Lunch ghat via Khekuani Bazar Road at ch 1900m-4200m.Effective length 2270m and construction of 1 No0.925mx1.20m U-Drain(L=8m) at ch 3250m. BDRIDP barguna-s 2.30 131.06 M/S Mithun Traders 109.43 01/01/2017 06/11/2017 100 Final bill paid
97 BDRIDP/BRG/BAM/CCA-RdR/01 (Tender ID 103724) Rehabilitation of road from Maidha Kakchira GPS cum Cyclone Shelter- Cotto Bhaijora GPS- Khuchnichora GPS cum Cyclone Shelter road from Ch. 930-2100m (Road ID-504194011 Salvage amount Tk 688913.00) Upazila: Bamna , District: Barguna. BDRIDP barguna-s 1.17 63.02 M/S Poly construction 56.72 01/09/2017 28/02/2018 50 WBM on going
98 BDRIDP/BRG/BAM/CCA-Rd/03 Improvement of Road from Tulatala BC road to Bebazia khal GPS cum Cyclone Shelter via Dhalu Sikder House from Ch. 00-500m under Bamna Upazila District Barguna Road ID-504194051 Salvage amount Tk. 27776 BDRIDP barguna-s 0.50 25.23 M/S Kohinoor Enterprise 22.70 27/09/2017 27/03/2018 100 Final bill paid
99 BDRIDP/BRG/BAM/CCA-Rd/04 Improvement of road from Ramna dawatala battala Culvert- Wapda via Poschim Golaghata GPS Cum Cyclone Shelter at ch 0.00-715m and Construction of 05Nos U-Drain on same road at ch 40m,250m450m,593m & 682m under Bamna Barguna BDRIDP barguna-s 0.72 51.85 M/S Atom Enterprise 49.26 07/03/2018 07/09/2018 55 WBM on going
100 BDRIDP/BRG/PAT/CCA-Rd/04(ID-146855) Improvement of Amratala GPS Cum Cyclone Shelter Connecting road Kelmegha UP-Mesherpur Bazar via Paschim Amratala GPS road. DPP ID No-504855062 New ID No-504853020 a) Earthwork Ch. 00-1000m. b) Bituminous Carpeting Ch. 00-1000m. c) U-Drain at Ch. 112.00m, BDRIDP barguna-s 1.00 69.86 M/S KK Enterprise 68.92 25/02/2018 10/07/2018 70 WBM completed
101 BDRIDP/BRG/ AMT/CCA-Rd/02(ID-162870) Improvement of road Khaliyan Bus-Stand to H/O Hasem Mridha via Valoybunia GPS & Nilgonj High School Road by BC From Ch. 00m to 1450m Including structure under Amtali Upazila, District: Barguna [Road ID-504094087] BDRIDP barguna-s 1.45 91.65 Md. Abul Kalm Azad 89.63 30/10/2018 55 WBM on going
102 BDRIDP/BRG/ BAM/UN-Rd/02(ID-162871) Improvement of Bamna UP Office-Gudhighata Bazar via Kuchnichora GPS Ramna UP Office-Gudhighata Bazar via Kuchinichora GPS Road by BC From Ch. 1370m to 2370m Earthen from CH. 1000m to 2000m & 1 Nos U-Drain at Ch. 1940m under Bamna Upazila, District: Bargun BDRIDP barguna-s 1.00 59.86 M/S Khankaker Sahin Ahmed.Paschim Goalchatmot. Faridpur 53.87 14/05/2018 14/11/2018 40 AS completed. WBM on going
103 BDRIDP/BRG/BAM/CCA-Rd/05(ID-162872) Improvement of Uttar Kakchira Bazar Chalavanga Launch Ghat via Gudhighata Adarsha GPS cum Cyclone Shelter Road by BC From Ch. 00m to 1000m under Bamna Upazila, District: Barguna [Road ID-504194080] BDRIDP barguna-s 0.00 59.19 M/S Khankaker Sahin Ahmed.Paschim Goalchatmot. Faridpur 53.27 14/05/2018 14/11/2018 0  
104 BDRIDP/BRG/ BAM/UN-Rd/03(ID-162873) Improvement of Dawatala UP Office-Uttar Kakchira Bazar via Nobogram GPS Road by BC From Ch. 00m to 1000m under Bamna Upazila, District: Barguna [Road ID-504193012] (Salvage amount Tk 426251.00). BDRIDP barguna-s 1.00 73.79 M/S Khankaker Sahin Ahmed.Paschim Goalchatmot. Faridpur 66.41 21/05/2018 21/11/2018 40 AS completed. WBM on going
105 BDRIDP/BRG/ PAT/GHT/01 Construction of Gfhat at Kakchira Bazar(GC) BDRIDP barguna-s 29.16 M/S Arif & Asif Construction. Sadar road Barguna. 28.64 13/05/2018 13/09/2018 0  
106 BDRIDP/BRG/ BAM/GHT/01 Construction of Gfhat at Bukabunia Bazar BDRIDP barguna-s 30.30 M/S Arif & Asif Construction. Sadar road Barguna. 30.19 27/05/2018 27/09/2018 10  
107 BDRIDP/BRG/ TAL/GHT/01 Construction of Gfhat at Taltali Bazar(GC) BDRIDP barguna-s 34.39 M/S jahanara Islam,College Road,Barguna 32.67 02/07/2018 02/11/2018 10  
108 BDRIDP/BRG/AMT/UZ-St/01 Construction of 21.00n RCC Girder Bridge on Amtali Mohiskata R&H - Kalagasia Kaserhat GC via Gulishakhali Bazar at ch 3790m under Amtali Upazila.Barguna. BDRIDP barguna-s 155.45 Md.Enayet Hossain 147.64 14/05/2018 14/01/2019 0 Materials Mobilized.Electric pole need shifted.
109 BDRIDP/BRG/PAT/CCA-Rd/05 Improvement of Kamarer Hat- Thakurbari to Katakhali Union road under Patharghata Upazila District Barguna Road ID-504854067a Earthwork Ch. 0.00m-250.00mb Carpeting BC Ch. 0.00m-250.00m BDRIDP barguna-s 0.25 17.15 M/S Othoi Enterprise,Dakkhin monosha,Purbo Dhupoti, Barguna Sadar,barguna. 16.29 01/07/2018 31/12/2018 55 WBM on going
110 BDRIDP/BRG/PAT/CCA-Rd/06 Improvement of Gabbaria GPS-Wapda Kamal shop via Tafalbaria Madrasha road under Patharghata Upazila District Barguna Road ID- 504855113a Earthwork Ch. 0.00m-2538.00mb Carpeting BC Ch. 0.00m-2538.00mc U-Drain 04 Nos at Ch. 628m 962m 1538m & 1950m BDRIDP barguna-s 2.54 168.35 M/S Akon Traders, pathorghata pauroshova, Barguna 166.66 01/07/2018 30/12/2018 15 Picking up existing HBB.ISG on going
111 BDRIDP/BRG/TAL/UZ-St/02(190363) Construction of 36.06m Long RCC Girder Bridge on Kathupatra GC-Bogirhat GC via H/O Patoary & Panchakoralia Bazar road at Ch. 9714.00m Road ID -504872005 under Taltali Upazila Barguna District. BDRIDP barguna-s 232.79 M/S Arif & Asif Construction & M/S Mithun Traders (JV0 209.51 01/08/2018 28/05/2018 20 Pile casting on going
112 BDRIDP/BRG/TAL/UZ-St/01(188388) Construction of 50.06m RCC Girder Bridge on Kachupatra GC- Bogirhat GC via Panchakoralia at Ch. 350.00m under Taltali Upazila District Barguna Road ID- 504872005 BDRIDP barguna-s 290.10 M/S Arif & Asif Construction & M/S Mithun Traders (JV0 274.13 01/08/2018 30/05/2019 0  
113 BDRIDP/BRG/BAM/CCA-Rd/06 Improvement of road Chalitabunia Bazar Bukabunia UP Dr. Lublu House.ID No-504194004 (a) Earth wark from Ch. 1739m-3174m. (b) Carpeting BC from Ch. 1739m-3174m. (c) Construction of 1 Nos 4.00mx3.00m & 1 Nos 1.5mX1.5m Box Culvert at Ch. 2616m & 2424m. 2 Nos BDRIDP barguna-s 1.44 123.35 M/S Akon Trading Hospital Road ,Bamna, Barguna 117.18 13/08/2018 13/02/2019 15 pile casting for Palisading work on going.box cutting on going
114 BDRIDP/BRG/BET/UZ-Ew/01 Badnikhali GC- Kazirhat GC via west karuna High school road by Earth Work from ch 1800.00m-2500.00m under Betagi. BDRIDP barguna-s 0.70 3.61 LCS Shapon 3.61 01/02/2015 30/04/2015 100 Final
115 BDRIDP/BRG/BET/UZ-Ew/02 Badnikhali GC- Kazirhat GC via west karuna High school road by Earth Work from ch 2500.00m-3700.00m under Betagi. BDRIDP barguna-s 1.20 4.19 LCS Shanu 4.19 01/02/2015 30/04/2015 100 Final
116 BDRIDP/BRG/BET/UZ-Ew/03 Resectioning of road from Niamati - Deshanterkathi via DC Hat Ch. 3900-5363m BDRIDP barguna-s 1.46 4.94 LCS Hemayet 4.94 09/06/2015 30/08/2015 100 Final
117 BDRIDP/BRG/AMT/CCA-Ew/01 Improvement of road from Bamna Bukabunia road to gafur Master House at WAPDA road from ch 0.00-600.00m BDRIDP barguna-s 0.60 1.81 Mrs Beauty Begum 1.81 20/06/2016 20/06/2016 100 Final
118 BDRIDP/BRG/BAT/CCA-Ew/01(a) Re-section of road from Betagi Barguna(UZR/Bangobandhu Bazar)-Charkhali Wapda Bazar (Bangobandhu Bazar-Paschim Karuna H/S -Kaialghata-Charkhali)road by Earthen at ch 0.00-500.00m under Betagi,Barguna. BDRIDP barguna-s 0.50 4.00 LCS Nur-E-Alom 4.00 01/01/2016 30/05/2016 100 Final
119 BDRIDP/BRG/BAT/CCA-Ew/01(b) Re-section of road from Betagi Barguna(UZR/Bangobandhu Bazar)-Charkhali Wapda Bazar (Bangobandhu Bazar-Paschim Karuna H/S -Kaialghata-Charkhali)road by Earthen at ch 500.00-2200.00m under Betagi,Barguna BDRIDP barguna-s 1.70 4.77 LCS Forkan Mollik 4.77 01/01/2016 30/05/2016 100 Final
120 BDRIDP/BRG/BAT/CCA-Ew/01(c) Re-section of road from Betagi Barguna(UZR/Bangobandhu Bazar)-Charkhali Wapda Bazar (Bangobandhu Bazar-Paschim Karuna H/S -Kaialghata-Charkhali)road by Earthen at ch2200.00-3425.00m under Betagi,Barguna BDRIDP barguna-s 1.23 4.81 LCS Monir Hosain 4.81 01/01/2016 30/05/2016 100 Final
121 BDRIDP/BRG/BAM/CCA-Ew/01 Re-section of road from Bamna Bukabunia road-Gafur Master Hiouse at RAPDA road by Earthen at ch 00.00-600.00m under Bamna,Barguna BDRIDP barguna-s 0.60 1.81 LCS Mrs. Bauety Begum 1.81 03/06/2016 20/06/2016 100 Final
122 BDRIDP/BRG/PAT/CCA-Ew/01 Re-section of road from Patharghata Jhaliaghata Bridge-Apeler Bridge road by Earthen at ch 00.00-1483.00m under Patharghata,Barguna BDRIDP barguna-s 1.48 2.53 LCS Khadija Begum 2.53 03/06/2016 20/06/2016 100 Final
123 BDRIDP/BRG/AMT/CCA-Ew/02 Improvement of road by Earth workfrom Amtali-Moshiskata RHD-Kalagasia Khasher Hat GC via Gulishakhali Bazar at ch 7500m-7900m under Amtali,Barguna. BDRIDP barguna-s 0.40 3.70 Md.Shahidul Islam 0.00 01/09/2016 30/03/2017 100 Final
124 BDRIDP/BRG/AMT/CCA-Ew/03 Improvement of road by Earth workfrom Amtali-Moshiskata RHD-Kalagasia Khasher Hat GC via Gulishakhali Bazar at ch 7900m-8400m under Amtali,Barguna. BDRIDP barguna-s 0.50 3.14 Md Shohel Musulli 0.00 01/09/2016 30/03/2017 100 Final
125 BDRIDP/BRG/AMT/CCA-Ew/04 Improvement of road by Earth workfrom Amtali-Moshiskata RHD-Kalagasia Khasher Hat GC via Gulishakhali Bazar at ch 8400m-8843m under Amtali,Barguna. BDRIDP barguna-s 0.44 3.23 Md.Shahin Gazi 3.23 01/09/2016 30/03/2017 100 Final
126 BDRIDP/BRG/PAT/UZ-Rd/01 Improvement of Kalmegha - Charduani GC Road from ch 2134m-4200m(ID No-504852005) BDRIDP barguna-s 2.07 2.46 Md Shah Alom 2.46 30/05/2017 100 Final
127 BDRIDP/BRG/PAT/UZ-Rd/02 Improvement of Kalmegha - Charduani GC Road from ch 4200m-5550m(ID No-504852005) BDRIDP barguna-s 1.35 2.61 Md. A.Rahim 2.61 30/05/2017 100 Final
128 BDRIDP/BRG/PAT/UZ-Rd/03 Improvement of Kalmegha - Charduani GC Road from ch 5550m-6600m(ID No-504852005) BDRIDP barguna-s 1.05 2.47 Monju Rani Adhikay 2.47 30/05/2017 100 Final
129 BDRIDP/BRG/PAT/UZ-Rd/04 Improvement of Kalmegha - Charduani GC Road from ch 6600m-6944m(ID No-504852005) BDRIDP barguna-s 0.34 1.71 Gonesh Chandra 1.71 30/05/2017 100 Final
130 BDRIDP/BRG/PAT/UZ-Rd/05 Improvement of Kalmegha - Charduani GC Road from ch 6944m-7500m(ID No-504852005) BDRIDP barguna-s 0.56 3.29 Shibani Rani 3.29 30/05/2017 100 Final
131 BDRIDP/BRG/PAT/UZ-Rd/06 Improvement of Kalmegha - Charduani GC Road from ch 7500m-8100m(ID No-504852005) BDRIDP barguna-s 0.60 2.64 Nikunjo Majhi 2.64 30/05/2017 100 Final
132 BDRIDP/BRG/PAT/CCA-EW/02 Improvement of road from Chaherabad GPS cum Cyclone Shelter (Chaherabad Dali Bari - Subendra Nath High school) at ch 0m-1435m BDRIDP barguna-s 1.44 2.27 Shyamol 2.27 100 Final
133 BDRIDP/BRG/PAT/CCA-EW/03 Improvement of road from Kathal Toli GPS Cum Cyclone shelter Connecting road ( Kathaltoli Bazar -Parighata via Kathaltoli GPS Road )at ch 0m-2230m BDRIDP barguna-s 2.23 3.02 Md.Mozibar 3.02 100 Final
134 BDRIDP/BRG/TAL/UZ-EW/01(Group-1) Improvement of Kachupatra Gc - bogir Hat GC via Panchakoralia Bazar road by earth at ch 4560m-8150m under Taltali,Barguna BDRIDP barguna-s 3.59 3.53 Lucky Begum 3.53 30/06/2017 100 Final
135 BDRIDP/BRG/TAL/UZ-EW/01(Group-2) Improvement of Kachupatra Gc - bogir Hat GC via Panchakoralia Bazar road by earth at ch 4560m-8150m under Taltali,Barguna BDRIDP barguna-s 3.59 3.42 Rashida Begum 3.42 30/06/2017 100 Final
136 BDRIDP/BRG/TAL/UZ-EW/01(Group-3) Improvement of Kachupatra Gc - bogir Hat GC via Panchakoralia Bazar road by earth at ch 4560m-8150m under Taltali,Barguna BDRIDP barguna-s 3.59 3.12 Hamida Begum 3.12 30/06/2017 100 Final
137 BDRIDP/BRG/TAL/UZ-EW/01(Group-4) Improvement of Kachupatra Gc - bogir Hat GC via Panchakoralia Bazar road by earth at ch 4560m-8150m under Taltali,Barguna BDRIDP barguna-s 3.59 2.62 Rahima Begum 2.62 30/06/2017 100 Final
138 BDRIDP/BRG/TAL/UZ-EW/01(Group-5) Improvement of Kachupatra Gc - bogir Hat GC via Panchakoralia Bazar road by earth at ch 4560m-8150m under Taltali,Barguna BDRIDP barguna-s 3.59 2.71 shahin Patoary 2.71 30/06/2017 100 Final
139 BDRIDP/BRG/SDR/UZ-Ew/01(Group-2) Improvement of road from Barguna - Lakurtala -Dhupati - Chandukhali GC at ch 9350m-10025m BDRIDP barguna-s 0.68 4.16 Abdus salam 4.16 30/06/2017 100 Final
140 BDRIDP/BRG/AMT/UZ-EW/01 Resectioning of road from Gazipur GC-Badura GC via Atharogasia UP Ch.3600m-4220m BDRIDP barguna-s 0.62 4.98 Md.Shahajahan Fakir 4.98 21/11/2017 21/05/2018 100 Final
141 BDRIDP/BRG/AMT/UZ-EW/02 Resectioning of road from Gazipur GC-Badura GC via Atharogasia UP Ch.4200m-4850m BDRIDP barguna-s 0.65 4.76 Md.Rubel chawkider 4.76 21/11/2017 21/05/2018 100 Final
142 BDRIDP/BRG/AMT/UZ-EW/03 Resectioning of road from Gazipur GC-Badura GC via Atharogasia UP Ch.5860m-6285m BDRIDP barguna-s 0.43 4.52 Md.Shahajahan 4.52 28/01/2018 30/04/2018 100 Final
143 BDRIDP/BRG/BET/UZ-Rd/01 Badnikhali GC- Kazirhat GC via west karuna High school road by BC from ch 0.00m-2500.00m under Betagi. BDRIDP betagi 2.50 157.76 M/S Khan Enterprise 137.12 07/02/2015 06/02/2016 0 Final bill paid
144 BDRIDP/BRG/BET/UZ-Rd/02 Badnikhali GC- Kazirhat GC via west karuna High school road by BC from ch 2500.00m-3700.00m under Betagi. BDRIDP betagi 1.20 73.73 M/S Khan Enterprise 63.39 07/02/2015 18/04/2016 0 Final bill paid
145 BDRIDP/BRG/BET/UZ-St/01 Construction of 2Nos 4.00m*3.30m 2Vent Box culvert on Badnikhali GC- Kazirhat GC via west karuna High school road by BC at ch 2621.00m & 2891.00m under Betagi. BDRIDP betagi 35.29 M/S Safi Enterprise 29.46 01/02/2015 01/02/2016 0 Final bill paid
146 BDRIDP/BRG/BET/UZ-Rd(R)/03 (Tender ID 25642) Rehabilitation of road from Niamati- Deshanterkathi via DC Hat by BC Ch. 3900-5363.00 (Road ID-504472002) Upazila: Betagi , District: Barguna. BDRIDP betagi 92.74 M/S Khan Enterprise 83.42 05/08/2015 17/10/2016 0 Final bill paid
147 BDRIDP/BRG/BET/UZ-St/02(Tender ID 25643) Construction of 2 Vent 3.60*4.00m RCC Box Culvert & 1 Nos U-Drain on Niamati -Deshantorkathi via DC Hat road at ch. 4830m & 1020m (Road ID-504472002) Upazila: Betagi , District: Barguna. BDRIDP betagi 29.60 Md.Munibur Rahman 23.47 05/08/2015 05/02/2016 0 Final bill paid
148 BDRIDP/BRG/BET/CCA-Rd/01(Tender ID25646) Improvement of road from Betagi-Barguna (UZR/Bango Bandhu Bazar) -Charkhali Wapda Bazar (Bango Bandhu Bazar Paschim Kauna H/S-Kaialghata- Charkhali) road By BC from Ch. 00-1800m(ID No. 504474298) Upazila: Betagi , District: Barguna. BDRIDP betagi 1.80 77.06 M/S Humayun Enterprise 65.83 05/08/2015 17/10/2016 0 Final bill paid
149 BDRIDP/BRG/BET/CCA-Rd/02(Tender ID-25647) Improvement of road from Betagi-Barguna (UZR/Bango Bandhu Bazar) -Charkhali Wapda Bazar (Bango Bandhu Bazar Paschim Kauna H/S-Kaialghata- Charkhali) road By BC from Ch. 1800-3425m(ID No. 504474298) Upazila: Betagi , District: Barguna. BDRIDP betagi 1.63 77.94 M/S Khan Enterprise 67.72 05/08/2015 17/10/2016 0 Final bill paid
150 BDRIDP/BRG/BAT/CCA-St/01(Tender ID25648) Construction of 4Nos U-Drain & 2Nos 2Vent 3.00X3.50m RCC Box Culvert on Betagi-Barguna (UZR/Bango Bandhu Bazar) -Charkhali Wapda Bazar (Bango Bandhu Bazar Paschim Kauna H/S-Kaialghata- Charkhali) road at ch.55m,638m,2810m,3200m,250m & 3112m (ID No. 504474 BDRIDP betagi 26.38 M/S Khan Enterprise 21.63 05/08/2015 05/02/2016 0 Final bill paid
151 BDRIDP/BRG/BET/UZ-Ew/01 Badnikhali GC- Kazirhat GC via west karuna High school road by Earth Work from ch 1800.00m-2500.00m under Betagi. BDRIDP betagi 0.70 3.61 LCS Shapon 3.61 01/02/2015 30/04/2015 0 Final
152 BDRIDP/BRG/BET/UZ-Ew/02 Badnikhali GC- Kazirhat GC via west karuna High school road by Earth Work from ch 2500.00m-3700.00m under Betagi. BDRIDP betagi 1.20 4.19 LCS Shanu 4.19 01/02/2015 30/04/2015 0 Final
153 BDRIDP/BRG/BAT/CCA-Ew/01(a) Re-section of road from Betagi Barguna(UZR/Bangobandhu Bazar)-Charkhali Wapda Bazar (Bangobandhu Bazar-Paschim Karuna H/S -Kaialghata-Charkhali)road by Earthen at ch 0.00-500.00m under Betagi,Barguna. BDRIDP betagi 0.50 4.00 LCS Nur-E-Alom 4.00 01/01/2016 30/05/2016 0 Final
154 BDRIDP/BRG/BAT/CCA-Ew/01(b) Re-section of road from Betagi Barguna(UZR/Bangobandhu Bazar)-Charkhali Wapda Bazar (Bangobandhu Bazar-Paschim Karuna H/S -Kaialghata-Charkhali)road by Earthen at ch 500.00-2200.00m under Betagi,Barguna BDRIDP betagi 1.70 4.77 LCS Forkan Mollik 4.77 01/01/2016 30/05/2016 0 Final
155 BDRIDP/BRG/BAT/CCA-Ew/01(c) Re-section of road from Betagi Barguna(UZR/Bangobandhu Bazar)-Charkhali Wapda Bazar (Bangobandhu Bazar-Paschim Karuna H/S -Kaialghata-Charkhali)road by Earthen at ch2200.00-3425.00m under Betagi,Barguna BDRIDP betagi 1.23 4.81 LCS Monir Hosain 4.81 01/01/2016 30/05/2016 0 Final
156 BDRIDP/BRG/PAT/UN-Rd/01 Rehabilitation of road from Lemua GC - C&B Bazar(RHD) via Hatempur road by BC from ch 2230.00m-4230.00m(ID NO-504853008) BDRIDP patharghata 2.00 105.04 Md.Nizam Uddin 104.96 26/04/2015 31/12/2016 0 Final bill paid
157 BDRIDP/BRG/PAT/CCA-Rd(R)/01 (Tender ID-27058) Rehabilitation of road from Jaliaghata Bridge -Apiler Bridge road from Ch. 0.00-1483m (Road ID-504855032) Upazila: Patharghata , District: Barguna. BDRIDP patharghata 1.48 70.90 M/S Afser & Co. 64.00 20/08/2015 20/08/2016 0 Final bill paid
158 BDRIDP/BRG/PAT/CCA-St/01(Tender ID-25645) Construction of 5 Nos U-Drain and 1 No Box Culvert on Jaliaghata Bridge - Apiler Bridge road at Ch.350m,704m,896m,974m, 1260m,& 528m (Road ID-504855032) Upazila: Patharghata , District: Barguna. BDRIDP patharghata 9.69 M/S Humaira Construction 7.89 05/08/2015 05/02/2016 0 Final bill paid
159 BDRIDP/BRG/AMT/UZ-Rd/01 Improvement of road from Amtali Mohiskata RHD -Kalagasia Khasherhat GC via Gulishakhali Bazar at ch 6843m-8843m BDRIDP patharghata 2.00 116.84 M/S Mithun Traders 99.32 12/09/2016 20/07/2017 0 Final bill paid
160 BDRIDP/BRG/ PAT/GHT/01 Construction of Gfhat at Kakchira Bazar(GC) BDRIDP patharghata 29.16 M/S Arif & Asif Construction. Sadar road Barguna. 28.64 13/05/2018 13/09/2018 0  
161 BDRIDP/BRG/PAT/CCA-Rd/05 Improvement of Kamarer Hat- Thakurbari to Katakhali Union road under Patharghata Upazila District Barguna Road ID-504854067a Earthwork Ch. 0.00m-250.00mb Carpeting BC Ch. 0.00m-250.00m BDRIDP patharghata 0.25 17.15 M/S Othoi Enterprise,Dakkhin monosha,Purbo Dhupoti, Barguna Sadar,barguna. 16.29 01/07/2018 31/12/2018 0 WBM on going
162 BDRIDP/BRG/PAT/CCA-Rd/06 Improvement of Gabbaria GPS-Wapda Kamal shop via Tafalbaria Madrasha road under Patharghata Upazila District Barguna Road ID- 504855113a Earthwork Ch. 0.00m-2538.00mb Carpeting BC Ch. 0.00m-2538.00mc U-Drain 04 Nos at Ch. 628m 962m 1538m & 1950m BDRIDP patharghata 2.54 168.35 M/S Akon Traders, pathorghata pauroshova, Barguna 166.66 01/07/2018 30/12/2018 0 Picking up existing HBB.ISG on going
163 BDRIDP/BRG/PAT/CCA-Ew/01 Re-section of road from Patharghata Jhaliaghata Bridge-Apeler Bridge road by Earthen at ch 00.00-1483.00m under Patharghata,Barguna BDRIDP patharghata 1.48 2.53 LCS Khadija Begum 2.53 03/06/2016 20/06/2016 0 Final
164 BDRIDP/BRG/PAT/UZ-Rd/01 Improvement of Kalmegha - Charduani GC Road from ch 2134m-4200m(ID No-504852005) BDRIDP patharghata 2.07 2.46 Md Shah Alom 2.46 30/05/2017 0 Final
165 BDRIDP/BRG/PAT/UZ-Rd/02 Improvement of Kalmegha - Charduani GC Road from ch 4200m-5550m(ID No-504852005) BDRIDP patharghata 1.35 2.61 Md. A.Rahim 2.61 30/05/2017 0 Final
166 BDRIDP/BRG/PAT/UZ-Rd/03 Improvement of Kalmegha - Charduani GC Road from ch 5550m-6600m(ID No-504852005) BDRIDP patharghata 1.05 2.47 Monju Rani Adhikay 2.47 30/05/2017 0 Final
167 BDRIDP/BRG/PAT/UZ-Rd/04 Improvement of Kalmegha - Charduani GC Road from ch 6600m-6944m(ID No-504852005) BDRIDP patharghata 0.34 1.71 Gonesh Chandra 1.71 30/05/2017 0 Final
168 BDRIDP/BRG/PAT/UZ-Rd/05 Improvement of Kalmegha - Charduani GC Road from ch 6944m-7500m(ID No-504852005) BDRIDP patharghata 0.56 3.29 Shibani Rani 3.29 30/05/2017 0 Final
169 BDRIDP/BRG/PAT/UZ-Rd/06 Improvement of Kalmegha - Charduani GC Road from ch 7500m-8100m(ID No-504852005) BDRIDP patharghata 0.60 2.64 Nikunjo Majhi 2.64 30/05/2017 0 Final
170 BDRIDP/BRG/PAT/CCA-EW/02 Improvement of road from Chaherabad GPS cum Cyclone Shelter (Chaherabad Dali Bari - Subendra Nath High school) at ch 0m-1435m BDRIDP patharghata 1.44 2.27 Shyamol 2.27 0 Final
171 BDRIDP/BRG/PAT/CCA-EW/03 Improvement of road from Kathal Toli GPS Cum Cyclone shelter Connecting road ( Kathaltoli Bazar -Parighata via Kathaltoli GPS Road )at ch 0m-2230m BDRIDP patharghata 2.23 3.02 Md.Mozibar 3.02 0 Final
172 BDRIDP/BRG/ TAL/GHT/01 Construction of Gfhat at Taltali Bazar(GC) BDRIDP Taltali 34.39 M/S jahanara Islam,College Road,Barguna 32.67 02/07/2018 02/11/2018 0  
173 BDRIDP/BRG/TAL/UZ-St/02(190363) Construction of 36.06m Long RCC Girder Bridge on Kathupatra GC-Bogirhat GC via H/O Patoary & Panchakoralia Bazar road at Ch. 9714.00m Road ID -504872005 under Taltali Upazila Barguna District. BDRIDP Taltali 232.79 M/S Arif & Asif Construction & M/S Mithun Traders (JV0 209.51 01/08/2018 28/05/2018 0 Pile casting on going
174 BDRIDP/BRG/TAL/UZ-St/01(188388) Construction of 50.06m RCC Girder Bridge on Kachupatra GC- Bogirhat GC via Panchakoralia at Ch. 350.00m under Taltali Upazila District Barguna Road ID- 504872005 BDRIDP Taltali 290.10 M/S Arif & Asif Construction & M/S Mithun Traders (JV0 274.13 01/08/2018 30/05/2019 0  
175 BDRIDP/BRG/TAL/UZ-EW/01(Group-1) Improvement of Kachupatra Gc - bogir Hat GC via Panchakoralia Bazar road by earth at ch 4560m-8150m under Taltali,Barguna BDRIDP Taltali 3.59 3.53 Lucky Begum 3.53 30/06/2017 0 Final
176 BDRIDP/BRG/TAL/UZ-EW/01(Group-2) Improvement of Kachupatra Gc - bogir Hat GC via Panchakoralia Bazar road by earth at ch 4560m-8150m under Taltali,Barguna BDRIDP Taltali 3.59 3.42 Rashida Begum 3.42 30/06/2017 0 Final
177 BDRIDP/BRG/TAL/UZ-EW/01(Group-3) Improvement of Kachupatra Gc - bogir Hat GC via Panchakoralia Bazar road by earth at ch 4560m-8150m under Taltali,Barguna BDRIDP Taltali 3.59 3.12 Hamida Begum 3.12 30/06/2017 0 Final
178 BDRIDP/BRG/TAL/UZ-EW/01(Group-4) Improvement of Kachupatra Gc - bogir Hat GC via Panchakoralia Bazar road by earth at ch 4560m-8150m under Taltali,Barguna BDRIDP Taltali 3.59 2.62 Rahima Begum 2.62 30/06/2017 0 Final
179 BDRIDP/BRG/TAL/UZ-EW/01(Group-5) Improvement of Kachupatra Gc - bogir Hat GC via Panchakoralia Bazar road by earth at ch 4560m-8150m under Taltali,Barguna BDRIDP Taltali 3.59 2.71 shahin Patoary 2.71 30/06/2017 0 Final
180 CRMIDP/BRGN/W-202 Chandukhali Bazar CRMIDP betagi 67 268.00 M/S humayan Enterprise 224.62 12/04/2020 30/06/2022 80 149.87 67 26/07/2022
181 DIRIP-2/VR(STR)-07/Barguna/2018-19 Construction of 30m long PSC bridge at Ch:100m on Bamna-Doutala-Sherebangla school- Nantu bari road under Bamna Upazila ,District -Barguna DIRIP-2 bamna 504195036 30.00 217.50 M/S MM Builders 183.18 90 31/12/2021
182 DIRIP-2/UNR(STR)-12/Barguna/2018-19 Construction of 24m long RCC Bridge at Ch. 1290m on Kakchira UP RHD - Fokir Hat via Khotasbag Road under Patharghata Upazila District Barguna Road ID- 504853015 DIRIP-2 bamna 504853015 24.00 174.41 M/S MM Builders 149.94 100 31/12/2021
183 DIRIP-2/VRBC-01/Barguna/2017-18 (TID-182446) Improvement of Road from Bamna Douatola Road Sher-E-Bangla school Nantu Bari Road - Sher-E-Bangla high school - Badsha Bari Jame mosque from Ch. 00m-1530m under Bamna Upazila District Barguna Road ID- 504195036 Salvage amount Tk. 496022 DIRIP-2 bamna 504195036 1.53 119.56 Md.Golam sorwar.Sonali Para,Barguna.Mob-01770344212 113.58 18/06/2018 18/06/2018 25/01/2019 100 272.60 18/01/2021
184 DIRIP-2/UZRBC-01/Barguna/2017-18 Improvement of Road from Hogalpati RHD Kamal Jomaddar Bari Lemua GC Patharghata Jamira Tola sarok Douatola Hogalpati 25 road Langol vanga Sardar Dofadar Bari from Ch. 2000m-5030m under Bamna Upazila District Barguna Road ID- 504192009 DIRIP-2 bamna 504192009 3.03 27670523.00 M/S Atom Enterprise. Amtalarpar, Barguna 29745905.89 29/08/2018 02/06/2019 100 18/01/2021
185 DIRIP-II/UZR/BC-02/Barguna/2018-19(229720). Improvement of Kholpatua GC - Douatola GC - Mathbaria RHD Kholpatua GC - Jafrakhali bridge Road from Ch. 1500m - 6147m under Bamna Upazila District Barguna Road ID- 504192005 Salvage amount Tk. 706228.00 [OSTETM] DIRIP-2 bamna 504192009 4.65 517.09 M/S Al Mamun Enterprise 501.58 100 14/07/2020
186 DIRIP-2/VR/BC-09/Barguna/2017-18 (TID-174399) Improvement of Aliyabad GPS-Dafa PS via GPS Road by BC from Ch. 00.00m-5525.00m under Betagi Upazila District Barguna. Road ID-504474093. DIRIP-2 betagi 504474093 5.53 399.74 M/S Arif & Asif Construction & Afser & Co(Jv).Sadar Road Barguna.Mob-01712885528 397.22 21/05/2018 21/05/2018 28/03/2019 100 487.93 31/12/2021
187 DIRIP-II/Barguna/UNRSTR-01/2018-19(221796) Construction of 18.00m long RCC Bridge on Betagi UPC-Hosnabad UPC via Goyal Bari GPS Road at Ch. 4547m under Betagi Upazila District Barguna Road ID-504473004 DIRIP-2 betagi 504473004 18.00 142.91 M/S Hazi Enterprise Bakerjong,BarishalMob:01715981612 135.49 04/12/2018 04/12/2018 27/10/2019 100 31/12/2021
188 DIRIP-II/Barguna/UNRSTR-03/2018-19(221798) Construction of 17.00m long RCC Bridge on Betagi UPC - Sabuj kanan- Kadamtala- Jalisha bazar Road at Ch. 5400m under Betagi Upazila District Barguna Road ID-504473022 DIRIP-2 betagi 504473022 17.00 154.97 M/S Hazi Enterprise Bakerjong,BarishalMob:01715981612 146.93 03/12/2018 03/12/2018 11/08/2019 100 31/12/2021
189 DIRIP-II/UNR(Str)-05/Barguna/2018-19(231540). Construction of 18m long RCC bridge at Ch. 6428m on Betagi UP-Hosnabad via Goalpar GPS Road under Betagi Upazila District Barguna Road ID-504473004 (Estimated Cost-1,34,75,248.00) [LTM] DIRIP-2 betagi 504473004 18.00 134.75 M/S Jhuma Enterprise. 128.01 100 31/12/2021
190 DIRIP-II/UNR(Str)-06/Barguna/2018-19(231541). Construction of 24m long RCC Bridge at Ch. 3000m on Betagi Kumrakhali Bazar - Mirer Hat via Kazirabad UP office Road under Betagi Upazila, Barguna Road ID- 504473013 DIRIP-2 betagi 504473013 24.00 191.16 M/S Khan Enterprise 181.61 100 18/01/2021
191 DIRIP-2/UNR/BC-03/Barguna/2017-18 (TID-174390) Improvement of Fultala WARDA Bazar-Bibichini UP Office-Shantirhat Road Fultala WAPDA Bazar-Bibichini UP Office-Talgasia H/S-Shantir Hat Road Bibichini UP-Shantirhat road by BC from Ch. 00.00m-2500.00m under Betagi Upazila District Barguna. Road ID-5044730 DIRIP-2 betagi 504473020 2.50 184.79 M/S Khakon Traders,Dakkhin Barguna,Barguna, Mob-01716431543 175.55 06/05/2018 06/05/2018 06/01/2019 100 557.01 14/07/2020
192 DIRIP-2/VR/BC-08/Barguna/2017-18 (TID-174391) I Improvement of Battala Bazar-Mosarrof Chairman College Road Kazirabad UPCNew-Barguna Betagi RHD Battala road by BC from Ch. 00.00m-1040.00m under Betagi Upazila District Barguna. Road ID-504474039 Salvage 1085289.00. DIRIP-2 betagi 504474039 1.04 79.89 M/S Hasan Enterprise,College Road Barguna.Mob-01716682716 75.90 06/05/2018 06/05/2018 18/12/2018 100 14/07/2020
193 DIRIP-2/UNR/BC-02/Barguna/2017-18 (TID-174398) Improvement of Betagi UPC-Hosnabad via Gowalbari GPS Road by BC from Ch. 1425.00m-6315.00m under Betagi Upazila District Barguna. Road ID-504473004 Salvage 59336.00. DIRIP-2 betagi 504473004 4.89 340.13 M/S Khan Enterprise,Betagi pauroshava,Barguna.Mob-01711960560 339.00 22/05/2018 22/05/2018 25/03/2019 100 103.97 14/07/2020
194 DIRIP-II/Barguna/UNRSTR-02/2018-19(221797) Construction of 20.00m long RCC Bridge on Betagi UPC - Sabuj kanan- Kadamtala- Jalisha bazar Road at Ch. 5800m under Betagi Upazila District Barguna Road ID-504473022 DIRIP-2 betagi 504473022 20.00 161.94 M/S Khan Enterprise,Betagi pauroshava,Barguna.Mob-01711960560 148.99 05/12/2018 05/12/2018 13/10/2019 100 14/07/2020
195 DIRIP-II/Barguna/UNRSTR-04/2018-19(221799) Construction of 18.00m long RCC Bridge on Betagi UPC-Hosnabad UPC via Goyal Bari GPS Road at Ch. 2835m under Betagi Upazila District Barguna Road ID-504473004 DIRIP-2 betagi 504473004 18.00 156.63 M/S Khan Enterprise,Betagi pauroshava,Barguna.Mob-01711960560 144.10 05/12/2018 05/12/2018 13/10/2019 100 14/07/2020
196 DIRIP-2/VR/BC-07/Barguna/2017-18 (TID-200129) Improvement of Khalifer Hat-Tengra Bazar Road by BC from Ch. 00.00m-3710.00m under Patharghata Upazila District Barguna. Road ID-504855063 Salvage 3124966.00. DIRIP-2 patharghata 504855063 3.71 292.00 M/S Atom Enterprise. Amtalarpar, Barguna Mob:01719633865 316.82 29/08/2018 29/08/2018 02/07/2019 100 31/12/2021
197 DIRIP-2/VR/BC-10/Barguna/2017-18(TID-194448) Improvement of Road from Keramotpur bazar RHD - Fokir Hat Apilar bhorani bridge from Ch. 00m-7600m under Patharghata Upazila District Barguna Road ID-504854023 Salvage amount Tk. 794117.00 DIRIP-2 patharghata 504854023 7.60 535.76 M/S Hazi Enterprise Bakerjong,BarishalMob:01715981612 556.17 29/07/2018 29/07/2018 09/06/2019 100 31/12/2021
198 DIRIP-II/VR(Str)-05/Barguna/2018-19(232757). Construction of 22m RCC Bridge on Kazirhat - Jaliaghata Road at Ch. 1000m under Patharghata Upazila District Barguna Road ID- 504854032 DIRIP-2 patharghata 504854032 22.00 155.96 M/S Tareq Enterprise. 148.16 06/01/2019 06/01/2019 14/11/2019 100 31/12/2021
199 DIRIP-II/VR(Str)-06/Barguna/2018-19(239606). Construction of 24m RCC Bridge on Nali Bazar Nachnapara Bazar via Uttor Kathaltoli community primary school Road at Ch. 2265m under Patharghata Upazila District Barguna Road ID- 504854050 DIRIP-2 patharghata 504854050 24.00 173.85 M/S Trinath Karmakar 165.15 06/01/2019 06/01/2019 14/12/2019 100 31/12/2021
200 DIRIP-2/UNRStr-20/Barguna/ 18-19(278509), Construction of 33m long PSC Bridge on Kathaltala UP R&H - Saptagram - Kathaltala Bazar via Burujpur GPS road at CH 5190 ID NO 504853010 under upazila Patharghata Dist Barguna. DIRIP-2 patharghata 504853010 33.00 339.51 0.00 08/05/2019 09/06/2020 09/06/2020 60 31/12/2021
201 DIRIP-2/UZRStr-04/Barguna/18-19,(278492) Construction of 32m long PSC Bridge on munsigong hat R&H - Nali SHAPLAJA GC via Charduani GC road at CH 7600m ID NO 504852001 under upazila Patharghata Dist Barguna. DIRIP-2 patharghata 504852001 32.00 414.26 0.00 08/05/2019 18/08/2020 18/08/2020 50 31/12/2021
202 DIRIP-II/VR(Str)-05/Barguna/2018-19 Construction of 22m RCC Bridge on Kazirhat - Jaliaghata Road at Ch. 1000m DIRIP-2 patharghata 504854032 22.00 156.00 M/S Tareq EnterpriseBetagi Pauroshava,Barguna 148.15 06/01/2019 14/11/2019 14/11/2019 100 78.32 31/12/2021
203 DIRIP-2/UNRStr-13/Barguna/18-19 Construction of 36.00m long PSC Bridge on Nachnapara UP RHD-Talukder Charduani Hat via Napiter Kheya Ghat Road at Ch. 4350m DIRIP-2 patharghata 504853013 36.00 55 417.00 TN - ASI(JV) 357.54 06/08/2019 18/08/2020 18/08/2020 55 0.00 55 31/12/2021
204 DIRIP-2/UNR/Str.-23/Barguna/2019-20 Construction of 30.00m Long PSC Girder Bridge on Patharghata UPC Padma Bazar Sluice Road at ch. 2400 m DIRIP-2 patharghata 504853011 30.00 240.00 M/S Amir Engineering corporetion. 222.00 07/04/2020 06/02/2021 06/02/2021 85 0.00 31/12/2021
205 DIRIP-2/UZRStr-03/Barguna/18-19 Construction of 39.00m Long RCC Girder Bridge on Munsiganj hat R&H - Nali (Shaplaja GC) via Charduani GC Road at ch. 4360m DIRIP-2 patharghata 504852001 39.00 321.00 M/S Lyla Builders & Md.Lutful Kabir (JV) 269.00 24/05/2020 11/04/2021 11/04/2021 85 0.00 31/12/2021
206 DIRIP-2/VR/BC-04/Barguna/2017-18:(TID-174389) Improvement of Badhurtala-Haritana Road by BC from Ch. 00.00m-2257.00m under Patharghata Upazila District Barguna. Road ID-504854012Salvage 376722.00. DIRIP-2 patharghata 2.26 165.23 M/S Moumita Traders.Ser-E-Bangla Road,BargunaMob-01716886426 156.97 07/05/2018 07/05/2018 14/01/2019 100 445.66 14/07/2020
207 DIRIP-2/UNR/BC-01/Barguna/2017-18 (TID-174392)I mprovement of Nachnapara UP Hazi Mozahar Uddin RHD-Katakhali Bazar RHD via Fakir Hat & MKPS Road by BC from Ch. 00.00m-4100.00m under Patharghata Upazila District Barguna. Road ID-504853006 Salvage 261464.00. DIRIP-2 patharghata 504853006 4.10 324.40 M/S Al Mamun Enterprise.Local Representative Md Nizam Uddin.Mob-01712742888 320.86 20/05/2018 20/05/2018 23/02/2019 100 249.21 14/07/2020
208 DIRIP-2/VR/BC-05/Barguna/2017-18 (TID-200128) Improvement of Haritana-Tengra Bazar Road by BC from Ch. 00.00m-3445.00m under Patharghata Upazila District Barguna. Road ID-504854020 Salvage 909376.00. DIRIP-2 patharghata 504854020 3.45 319.30 M/S Atom Enterprise. Amtalarpar, Barguna Mob:01719633865 349.64 29/08/2018 29/08/2018 02/07/2019 100 14/07/2020
209 DIRIP-2/VR/BC-06/Barguna/2017-18 (TID-174395) Improvement of GutabashaR&H-Masherkhal R&H via H/O Kudus Mia Road by BC from Ch. 00.00m-3260.00m under Patharghata Upazila District Barguna. Road ID-504854089 Salvage 5276721.00. DIRIP-2 patharghata 504854089 3.26 248.63 M/S Al Mamun Enterprise.Local Representative Md Nizam Uddin.Mob-01712742888 259.00 20/05/2018 20/05/2018 24/01/2019 100 90.96 14/07/2020
210 DIRIP-2/VR/BC-03/Barguna/2017-18(TID-208016) Improvement of Karamothpur Bus Stand-Kazirhat via H/O Mokbul Road by BC from Ch. 00.00m-3360.00m under Patharghata Upazila District Barguna. Road ID-504854030 Salvage 22286.00. DIRIP-2 patharghata 504854030 3.36 322.66 M/S Al Mamun Enterprise.Local Representative Md Nizam Uddin.Mob-01712742888 351.56 23/09/2018 23/09/2018 01/10/2019 100 14/07/2020
211 GSIDP/BGN/DW-54 Improvement of Hazi Abdul Gani Mosque Union: Gulisthakhali[Latitude:22.2291, Longitude:90.2370] GSIDP amtali 3.33 M/S Shaikh Service & Co 3.17 01/11/2018 09/02/2019 0 03/04/2019
212 GSIDP/BGN/DW-55 Improvement of Gulisthakhali Abdul Gani Mosque Attached Eidgha, Union: Gulisthakhali.[Latitude:22.2289, Longitude: 90.2373] GSIDP amtali 7.64 M/S. Mohona Enterprise , 7.26 01/11/2018 09/02/2019 0 03/04/2019
213 GSIDP/BGN/DW-61 Improvmeent of Talukderbari jame Mosque,Union : Chawra .[ Latitude: 22.1490,Longitude: 90.2359] GSIDP amtali 5.00 M/S. Mridha Enterprise 4.75 14/02/2019 22/01/2019 10 03/04/2019
214 GSIDP/BGN/DW-62 Improvement of Sree Sree Hory Guru chad Baktoseba Asrom Mondir,Union: Chawra [ Latitude: 22.1554,Longitude: 90.2478] GSIDP amtali 5.00 Mst.Jahanara Isalam. 4.75 25/02/2019 05/05/2019 10 03/04/2019
215 GSIDP/BGN/DW-71 Improvement of Gulisthakhali Bazar Jame-E-Mosque,Union : Gulisthakhali .[ Latitude: 22.2218,Longitude: 90.2314] GSIDP amtali 5.00 0.00 0 03/04/2019
216 GSIDP/BGN/DW-72 Improvement of Jame-E-Mosque Infront H/O Badsha Mridha,Union : Amtali.[ Latitude: 22.1152,Longitude: 90.2372] GSIDP amtali 11.59 0.00 0 03/04/2019
217 GSIDP/BGN/DW-52 Improvement of Gulisthakhali Bazar Attached Shree Shree Radha Gobindo Kali Mondir, Union: Gulisthakhali.[Latitude: 22.3722, Longitude:90.3911] GSIDP amtali 5.37 M/S. Humayra Construction 5.10 01/11/2018 05/02/2019 100 02/04/2019
218 GSIDP/BGN/DW-53 Improvement of PurboKukua Shree Shree Hori DurgaShebashram, Union: Kukua.[Latitude: 22.3165, Longitude:90.531] GSIDP amtali 6.00 M/S. Sohel Traders 5.70 01/11/2018 04/02/2019 100 02/04/2019
219 GSIDP/BGN/DW-12 Improvement of Dakhin Kholpatua Late Abdul Hoque Howldar House Union:Ramna[Latitude:22.4333, Longitude: 90.11866.] GSIDP bamna 5.83 Md Golam Sarower 5.54 13/06/2018 03/05/2019 100 03/04/2019
220 GSIDP/BGN/DW-8 Improvement of Baitul Aman Jame Mosque at Chootto Jadoppura Union: Bukabunia[Latitude:22.5303, Longitude: 90.1121.] GSIDP bamna 5.83 M/S K.K Traders 5.08 20/06/2018 21/08/2018 100  
221 GSIDP/BGN/DW-9 Improvement of Ruhita Bazar Jame Mosque Union: Bamna Sadar[Latitude:22.476, Longitude: 90.1345.] GSIDP bamna 5.83 M/S R.S Business Center 5.54 20/06/2018 20/08/2018 100  
222 GSIDP/BGN/DW-10 Improvement of Parchim Safipur Jame Mosque (Chowdhary Bari) Union: Bamna Sadar[Latitude:22.5275, Longitude: 90.145.] GSIDP bamna 5.34 M/S K.K Traders 5.08 10/06/2018 11/10/2018 100  
223 GSIDP/BGN/DW-11 Improvement of Durgha Mondir At Amtoli Ramesh Baparys House Union: Bamna Sadar[Latitude:22.5263, Longitude: 90.1101.] GSIDP bamna 5.00 M/S Shithil Enterprise 4.75 20/06/2018 21/08/2018 100  
224 GSIDP/BGN/DW-13 Improvement of Maleque Jomadder Houses Jame Mosque Union: Ramna[Latitude:22.43336, Longitude: 90.12.] GSIDP bamna 5.00 M/S Shaikh Service & Co 4.75 20/06/2018 28/08/2018 100  
225 GSIDP/BGN/DW-14 Improvement of Uttar Gudighata Baikalin Bazar Jamae Mosque Union: Dawatala [Latitude:22.3767, Longitude: 90.0502.] GSIDP bamna 5.00 M/S Al Mamun Enterprise 4.75 20/06/2018 20/08/2018 100  
226 GSIDP/BGN/DW-15 Improvement of Jame Mosque at Dakhin Bhaijora Nasar Mirdha House Union: Ramna [Latitude:22.369, Longitude: 90.14616.] GSIDP bamna 5.83 M/S Akon Traders 4.75 20/06/2018 20/08/2018 60  
227 GSIDP/BGN/SDW-59 Improvement of 01 No Ward Bashbunia Village Badsabari Common Graveyard,Union: 08 no Barguna .[ Latitude: 22.133,Longitude;90.1242.] GSIDP barguna-s 5.30 M/S Azad Traders 5.04 17/01/2019 18/03/2019 100 03/04/2019
228 GSIDP/BGN/SDW-63 Improvement of Parirkhal Chaiman Bari Jame Mosque,Union: M Baliatali .[ latitude: 22.0435,Longitude: 90.0542] GSIDP barguna-s 7.53 M/S Sumi & Brothers 7.15 18/03/2019 25/06/2019 0 03/04/2019
229 GSIDP/BGN/SDW-64 Improvment of Parirkhal Bazar Bus Stand Darus Sunnat Jame Mosque,Union :M Baliatali.[Latitude: 22.0435,Longitude:90.0542.] GSIDP barguna-s 5.00 M/S Sumi & Brothers 4.75 24/03/2019 01/06/2019 0 03/04/2019
230 GSIDP/BGN/SDW-66 Improvement of Karaitala Biswas Bari Jam-E-Mosque,Union : Barguna Pourashava.[ Latitude: 22.1500,Longitude: 90.1393] GSIDP barguna-s 5.00 0.00 0 03/04/2019
231 GSIDP/BGN/SDW-67 Improvement of Patakata Meher Ali Houlader Bari Jame-E-Mosque,Union : Baliatili [ Latitude: 21.9939,Longitude: 90.0372] GSIDP barguna-s 5.00 0.00 0 03/04/2019
232 GSIDP/BGN/SDW-68 Improvement of Graveyerd No Parirkhal AL-Haz Rustum Ali,Union : 9no M. Baliatoly,Latitude:22.0435,Longitude: 90.0568] GSIDP barguna-s 3.17 0.00 0 03/04/2019
233 GSIDP/BGN/DW-1 Improvement of Improvement of Late Asaduzzaman Khan house Jame Mosque at Nishanbaria village under Nishanbaria Union. [Latitude:22.036155, Longitude: 90.008388.] GSIDP barguna-s 5.00 M/S. Rajia Construction 4.75 03/05/2018 12/09/2018 100 02/04/2019
234 GSIDP/BGN/DW-16 GSIDP/BGN/DW-16 Improvement of Upazila parishad Jame Mosque Union: Barguna Pourashava[Latitude:22.1583, Longitude: 90.1099.] GSIDP barguna-s 5.00 M/S Hanif Costruction 4.75 100 02/04/2019
235 GSIDP/BGN/DW-17 Improvement of Kalibari Sarbojanin Durga mondir Union: Barguna Pourashava[Latitude:22.1556, Longitude: 90.1323.] GSIDP barguna-s 5.00 M/S Shaikh Service & Co 4.75 04/07/2018 09/10/2018 100 02/04/2019
236 GSIDP/BGN/DW-21 Improvement of Barguna Shahid Sriti Sarak Gono Koborsthan Union: Barguna Pourashava[Latitude:22.1527, Longitude: 90.1275.] GSIDP barguna-s 19.65 M/S Mahi Enterprise 18.67 04/07/2018 12/10/2018 100 02/04/2019
237 GSIDP/BGN/DW-22 Improvement of Shasanghat Chulli & Dahoghar Adjacent Barguna Shahid Sriti Sarak Union: Barguna Pourashava[Latitude:22.1525, Longitude: 90.1267.] GSIDP barguna-s 11.18 M/S Sumi & Brothers 10.62 100 02/04/2019
238 GSIDP/BGN/SDW-40 Improvement of Keorabunia Badamtala (Dawatala) Baitul Mamur Jam-E- Mosque, Union: Burirchar , Latitude: 22.1711 , Longitude: 90.1684. GSIDP barguna-s 24.08 M/S Azad Traders 22.88 29/07/2018 05/11/2018 100 02/04/2019
239 GSIDP/BGN/DW-58 GSIDP/BGN/DW-58 Improvement of No Waed Bashbunia village Badsabari Jame Mosque,Union : 08 No Barguna.[Latitude: 22.133,Longitude: 90.1242] GSIDP barguna-s 7.26 M/S Othoi Enterprise 6.90 17/01/2019 21/03/2019 100 02/04/2019
240 GSIDP/BGN/DW-2 Improvement of Potkakhali Grave Yard Under Dhalua Union.[Latitude:22.159568, Longitude:90.804400] GSIDP barguna-s 5.00 M/S. Sermin Construction 4.75 24/05/2018 24/09/2018 100  
241 GSIDP/BGN/DW-3 Improvement of Potkakhali (Burning Ground) Shashan Under Dhalua Union.[Latitude:22.158780, Longitude:90.087078.] GSIDP barguna-s 5.00 M/S, Musolli Construction 4.75 24/05/2018 24/09/2018 100  
242 GSIDP/BGN/DW-4 Improvement of Uttar Dema Arshed Gazi Bari Jame Mosque Under Badarkhali Union. [Latitude:22.1820, Longitude: 90.0605.] GSIDP barguna-s 5.00 M/S. Prapti and Somapti Enterprise 4.75 07/05/2018 07/07/2018 100  
243 GSIDP/BGN/DW-5 Improvement of Maddya Gudhighata Jame Mosque Under Fuljhuri Union.[Latitude:22.2093, Longitude: 90.1526.] GSIDP barguna-s 5.00 M/S. Mim Construction 4.75 07/05/2018 07/07/2018 100  
244 GSIDP/BGN/DW-6 Improvement of Md. Siddiqur Rahman Chairman bari Jame Mosque Under Burirchar Union.[Latitude:22.1427, Longitude: 90.1350.] GSIDP barguna-s 5.00 Md Golam Sarower 4.75 24/05/2018 25/07/2018 100  
245 GSIDP/BGN/DW-7 Improvement of Garjanbunia School & College adjacent Jame Mosque under Nishanbaria Union.[Latitude:22.035397, Longitude: 90.024950.] GSIDP barguna-s 5.00 M/S. Mohona Enterprise , 4.75 20/05/2018 20/09/2018 100  
246 GSIDP/BGN/DW-33 Improvement of Badnikhali Jame Mosque, Union: Buramazumder.[Latitude: 23.298372, Longitude: 90.120030] GSIDP betagi 4.00 M/S Matri Enterprise 3.80 08/07/2018 16/11/2018 75 04/04/2019
247 GSI DP/BGN/DW-34 Improvement of Kazirhat Jame Mosque, Union: Buramazumder.[Latitude: 22.333887, Longitude: 90.137855] GSIDP betagi 3.00 M/S Subarna Enterprise 2.85 08/07/2018 16/09/2018 100 04/04/2019
248 GSIDP/BGN/DW-38 Improvement of Jannatul Baki Graveyard, Union: Kazirabad.[Latitude: 22.266078, Longitude: 90.142250] GSIDP betagi 3.00 M/S Tareque Enterprise 2.85 08/07/2018 16/11/2018 100 04/04/2019
249 GSIDP/BGN/SDW-60 Improvement of Gread Laxmipura Rahmatpur Madrasha Jame Mosque,Union : Betagi .[Latitude: 22.421752,Longitude: 90.214590.] GSIDP betagi 7.62 M/S Matri Enterprise 7.24 03/02/2019 11/01/2019 30 04/04/2019
250 GSIDP/BGN/SDW-69 Improvement of Bitun Nur Jame Mosque,Union : Bibichini.[ Latitude: 22.45880,Longitude: 90.21848] GSIDP betagi 5.00 0.00 0 04/04/2019
251 GSIDP/BGN/SDW-70 Improvement of South Sopkhali Sarder Bari Durga Mondir& Saba asrom,Union : Hosnabad.[ Latitude: 22.33543,Longitude: 90.1504] GSIDP betagi 5.01 0.00 0 04/04/2019
252 GSIDP/BGN/SDW-73 Improvement of Grade Laxmipur Village Khalifabari Jame Mosque, Union: Betagi Sadar.[Latitude: 22.428742, Longitude: 90.208605.] GSIDP betagi 3.04 0.00 0 04/04/2019
253 GSIDP/BGN/DW-23 Improvement of Kadomtala Central Mosjid & Eidgha near The Md. Jalil khan house, Union: Hosnabad [Latitude:22.3543, Longitude: 90.1924] GSIDP betagi 3.00 M/S Othoi Enterprise 2.85 08/07/2018 16/09/2018 100 03/04/2019
254 GSIDP/BGN/DW-25 Improvement of Jalisha bazer Central Mosjid, Union: Hosnabad.[Latitude:22.3697, Longitude: 90.1315 GSIDP betagi 4.00 M/S Tareque Enterprise 3.80 08/07/2018 26/11/2018 100 03/04/2019
255 GSIDP/BGN/DW-26 Improvement Edgha Field near Talgasia High School, Union, Hosnabad,[Latitude:22.4475, Longitude: 90.2047] GSIDP betagi 4.00 M/S Othoi Enterprise 4.80 08/07/2018 12/11/2018 100 03/04/2019
256 GSIDP/BGN/DW-27 Improvement of putiakhali purbo para Sarbojonin Durgah Mondir, Union: Bibicini[Latitude:22.4557, Longitude: 90.1792] GSIDP betagi 3.00 M/S Othoi Enterprise 2.85 08/07/2018 16/09/2018 100 03/04/2019
257 GSIDP/BGN/DW-29 Improvement of Kathaltoli Madrasha Masjid, Union: Mokamia[Latitude:22.3217, Longitude: 90.1088] GSIDP betagi 4.00 M/S Othoi Enterprise 3.80 08/07/2018 12/10/2018 100 03/04/2019
258 GSIDP/BGN/DW-30 Improvement of Mokamia Sarbojonin Obhodut Mondir, Union Mokamia [Latitude:22.3697, Longitude: 90.1333] GSIDP betagi 3.00 M/S Othoi Enterprise 2.85 08/07/2018 16/09/2018 100 03/04/2019
259 GSIDP/BGN/DW-37 Improvement of Howlader bari Baitul Aman Jame Mosque, Union: Kazirabad.[Latitude: 22.265325, Longitude: 90.149872] GSIDP betagi 3.00 M/S Matri Enterprise 2.85 08/07/2018 10/10/2018 100 03/04/2019
260 GSIDP/BGN/DW-24 Improvement of Abdul bari Howlader house near The Mosjid & Eidgha, Union: [Latitude:22.3543, Longitude: 90.1924 GSIDP betagi 3.00 M/S Subarna Enterprise 2.85 08/07/2018 18/09/2018 100 03/04/2019
261 GSIDP/BGN/DW-28 Improvement of DC hat Masjid, Union: Bibicini[Latitude:22.4705, Longitude: 90.2164] GSIDP betagi 3.00 M/S Matri Enterprise 2.85 08/07/2018 16/09/2018 100 03/04/2019
262 GSIDP/BGN/DW-32 Improvement of Palkanda Gafur Sikder bari Jame Mosque, Union: Batagi Sadar.[Latitude: 22.402095, Longitude: 90.157382] GSIDP betagi 3.02 M/S Othoi Enterprise 2.85 08/06/2018 16/10/2018 100 03/04/2019
263 GSIDP/BGN/DW-35 Improvement of Badnikhali Durga Mondir Paschim Buramajumder Paik bari Loknath Mondir, Union: Buramazumder[Latitude: 22.322007, Longitude: 90.109923] GSIDP betagi 3.00 M/S Subarna Enterprise 2.85 08/07/2018 16/09/2018 100 03/04/2019
264 GSIDP/BGN/DW-39 Improvement of Kalikabari Sarbojonin Durga Mondir, Union:Sharisamuri.[Latitude: 22.281605, Longitude: 90.116165] GSIDP betagi 3.00 M/S Subarna Enterprise 2.85 08/07/2018 13/09/2018 100 03/04/2019
265 GSIDP/BGN/DW-44 Improvement of 09no Singrabunia GPS Jame Mosque, Union:Nachnapara [Latitude:22.150725, Longitude: 89.949016] GSIDP patharghata 3.50 M/S. Sohel Traders 3.33 03/09/2018 11/01/2019 20 04/04/2019
266 GSIDP/BGN/DW-18 Improvement of Gono Kobor Union: Rayhanpur [Latitude:22.183599, Longitude: 89.994025.] GSIDP patharghata 14.59 M/S Sermin Construction 13.86 04/07/2018 30/10/2018 100 03/04/2019
267 GSIDP/BGN/DW-19 Improvement of Kathalia Union parishad Jame Mosque Union: Kathalia[Latitude:22.092666, Longitude: 89.961892.] GSIDP patharghata 26.14 M/S Anwar Hossain 24.84 04/07/2018 12/11/2018 100 03/04/2019
268 GSIDP/BGN/DW-20 Improvement of Patharghata Gobindo Mondir Union: Patharghata pourashava[Latitude:22.044530, Longitude: 89.972124.] GSIDP patharghata 9.69 M/S. Jayeda Enterprise 9.20 03/09/2018 03/04/2018 100 03/04/2019
269 GSIDP/BGN/DW-41 Improvement of Kamarerhat Jame Mosque, Union: Kathaltali [Latitude:22.124607, Longitude: 90.000383] GSIDP patharghata 4.00 M/S Jami Enterprise 3.80 03/09/2018 02/07/2019 100 03/04/2019
270 GSIDP/BGN/DW-42 Improvement of Kanchurhat Jame Mosjid, Union: Kalmegha.[Latitude:22.083874, Longitude: 89.99265] GSIDP patharghata 4.00 M/S Jami Enterprise 3.80 03/09/2018 03/04/2019 100 03/04/2019
271 GSIDP/BGN/DW-43 Improvement of Badurtala Hat Jame Mosque, Union: Patharghata sadar [Latitude:22.011992, Longitude: 89.964855] GSIDP patharghata 4.50 M/S. Khan Traders 4.28 10/10/2018 18/01/2019 100 03/04/2019
272 GSIDP/BGN/DW-45 Improvement of Khalufarhat Montazia Jame Mosque, Union: Charduani [Latitude:22.070536, Longitude: 89.917352] GSIDP patharghata 4.00 M/S. Khan Traders 3.80 10/10/2018 18/01/2019 100 03/04/2019
273 GSIDP/BGN/DW-48 Improvement of Charpara Sarbajonin Durga Mondir, Union: Chotobogi.[Latitude:22.0200, Longitude: 90.0881.] GSIDP Taltali 5.04 Mst.Jahanara Isalam. 01 Nov 2018 4.78 01/11/2018 10/02/2019 100 03/04/2019
274 GSIDP/BGN/DW-46 Improvement of Karaibaria Bazar Jamey Mosque, Union:Koaibaria.[Latitude: 22.0199, Longitude: 90.1596.] GSIDP Taltali 5.03 Mst,Jahanara Isalam, 4.78 01/11/2018 10/02/2019 40 03/04/2019
275 GSIDP/BGN/DW-49 Improvement of Behala Nath Para Sarbojonin Manasha Mondir, Union: Karibaria[Latitude: 22.004, Longitude: 90.1586.] GSIDP Taltali 5.06 M/S Hanif Costruction 4.80 01/11/2018 10/02/2019 80 03/04/2019
276 GSIDP/BGN/DW-50 Improvement of Fokir Hat Bazar Jamey Mosque, Union: Sonakata.[Latitude: 21.8974, Longitude: 90.0349] GSIDP Taltali 5.03 M/S Anwar Hossain 4.78 24/09/2018 12/12/2018 100 03/04/2019
277 GSIDP/BGN/DW-47 Improvement of Taltali Kalibari SarbajoninManashaMandir, Union: Barobogi.[Latitude:21.9805, Longitude: 90.0846.] GSIDP Taltali 5.04 Mst.Jahanara Isalam. 4.78 01/11/2018 10/02/2019 100 02/04/2019
278 GSIDP/BGN/DW-51 Improvement of Jamey Mosque Infront of H/O Jamal Master Vill: Kachupatra, Union: Panchakorila.[Latitude: 22.0659, Longitude: 90.1475.] GSIDP Taltali 5.00 Gazi Mozammel Haque 4.75 24/10/2018 03/04/2019 100 02/04/2019
279 IBRP/Bar/Amtoli/Brg-02 Construction of 37.00m Long RCC Girder Bridge over Tafalbari Khal branch on Atharogchia Up-Bauria Sluice via North Sonakhali GPS & Julakher Bazar & East Sonakhali GPS road.at ch 4400m IBRP amtali 504093024 37.00 30 355.52 Abul Kalam Azad.Azad Mansion Muslimpara 337.32 16/07/2019 02/08/2019 31/10/2020 30 100.00 30 13/07/2020
280 IBRP/Bar/Amtoli/Brg-03 Construction of 48.00m Long RCC Girder Bridge over gazipur Khal on Gazipur GC-Kukua hat(sahid Sohorawardi High School) road.at ch 522m IBRP amtali 504473001 48.00 0 480.63 Abul Kalam Azad.Azad Mansion Muslimpara, 423.79 16/07/2019 02/08/2019 26/09/2020 0 0.00 0 13/07/2020
281 IBRP/Bar/Bam/main/Brg-01 Maintenance of 18.00m Bridge on Goapkhali GPS -Amtoli GPS via karim Maolana House at ch.2100.00m. IBRP bamna 504194027 18.00 100 30.37 M/S. FK Enterprize 28.85 01/04/2019 15/04/2019 09/10/2019 100 28.84 100 13/07/2020 Completed
282 IBRP/Bar/Amtoli/Brg-01 Construction of 72.00m Long RCC Girder Bridge over Tafalbari Khal on Atharogachia UP - Gazipur GC road Via Budhbarar Bazar road at Ch 2540m IBRP bamna 504093030 72.00 0 685.70 TN-ASI (JV) Kapuria Patty 601.42 06/01/2020 20/01/2020 13/01/2021 0 0.00 0 13/07/2020
283 IBRP/Bar/Path/Brg-01 Construction of 50m Long R.C.C Girder Bridge on Machayer Khal Patharghata at Ch.15.00m IBRP patharghata 504854088 50.00 0 507.11 M/S Kohinur Enterprise 480.24 08/05/2019 22/05/2019 15/05/2020 2 0.00 0 13/07/2020 Site Condition is Completed
284 IRIDP-2/BGN/DW-75 (a) Improvement of Munshir hat (Garabunia GPS - Utter Garabunia H/O Kalam Molla Via Chalitabunia & Utter Garabunia GPS [ Atharogachia Union Parasad Calitabunia Golamail Hazir House – 37 no Uttar Calitabunia GPS - Utter Garabunia GPS - Munsir hat road] (Ch.00m - 1000m.) ID NO. 504095317(b) Construction of 03nos 0.625mx0.900m culvert at ch.620m,670m,940m on the same road. IRIDP-2 amtali 504095317 1.00 61.19 M/S. Parul And Sons 58.13 0 06/05/2019
285 IRIDP-2/BGN/DW-63 Improvement of Aoule nagor-H/O Asoke Ali Molla via H/O Hanif Fakir road.(Ch.00m - 600m.) ID NO. 504095334 IRIDP-2 amtali 504095334 0.60 41.57 M/S Rudra Enterprise 41.33 27/02/2018 06/10/2018 100 05/05/2019
286 IRIDP-2/BGN/DW-10 Improvement of Locha Battala Sluice gate-Amtali Taltali UZR road (Ch. 2400m-3554m) IRIDP-2 amtali 504094077 1.15 63.50 M/S Afser & Co 58.42 28/02/2016 30/06/2017 100 30/04/2019
287 IRIDP-2/BGN/DW-11 (a)Improvement of Kawnia BC- Loda Khalgora Iron Bridge Via Kawnia High School&GPS & Chalavanga GPS(Chalavanga culvert – Loda khal gora) road ( Ch.700m-1513m) (b) Construction of 01no 0.625mx0.90m culvert at ch.1360m on the same road. IRIDP-2 amtali 504095019 0.81 47.93 M/S Masum Billah Enterprise 40.54 28/02/2016 13/02/2017 100 30/04/2019
288 IRIDP-2/BGN/DW-17 (a) Improvement of Khekuani Bazar- Haridrabaria DKS Dhakile Madrasha via Gulishakhali Bazar&Abdul Gini Dhakile Madrasha road ( Ch.2400m-3400m) (b) Construction of 01no 1.60mx1.60m culvert at ch.3150m on the same road. IRIDP-2 amtali 504094054 1.00 57.64 M/S Md.Delwar Hossain 47.12 29/03/2016 23/01/2017 100 30/04/2019
289 IRIDP-2/BGN/SDW-20 Improvement of Atharogchia Up-Bauria Sluice road via Dakkhin Sonakhali GPS & Julakher Bazar & East Sonakhali GPS.Road(Ch.4450m-6000m.) IRIDP-2 amtali 504093024 1.55 88.77 Md. Nizamuddin 76.27 04/10/2016 20/05/2018 100 30/04/2019
290 IRIDP-2/BGN/DW-28 Improvement of Locha Battala Sluice gate - Amtali Taltali UZR road.(Ch.4554m - 4984m.) IRIDP-2 amtali 504094077 0.43 23.93 Md. Nizamuddin 19.73 24/11/2016 24/10/2017 100 30/04/2019
291 IRIDP-2/BGN/DW-29 (a)Improvement of Kawnia BC - Loda Khalgora Iron Bridge Via Kawnia High School&GPS & Chalavanga GPS(Chalavanga culvert – Loda khal gora) road ( Ch.1513m-2248m)(b) Construction of 02nos 0.625mx0.90m culvert at ch.1950m & 2230m on the same road. IRIDP-2 amtali 504095019 0.74 42.60 M/S. Deip Enterprise 38.67 24/11/2016 15/02/2018 100 30/04/2019
292 IRIDP-2/BGN/DW-30 (a)Improvement of Sener hat-Biswaser hat road.(Ch.00m - 1000m.)(b) Construction of 01nos 4.0mx4.0m culvert at ch.968m on the same road.(c) Construction of 02nos 0.625mx0.90m culvert at ch.200m&450m on the same road. IRIDP-2 amtali 504094016 1.00 70.63 Md. Sahidul Islam 61.10 24/11/2016 07/12/2016 100 30/04/2019
293 IRIDP-2/BGN/DW-31 (a)Improvement of Gulishakhali UP-Kalagachia Bazar via Fakirkhali GPS.road.(Ch.1750m - 2750m.)(b) Construction of 01nos 4.0mx4.0m culvert at ch.2560m on the same road.(c) Construction of 02nos 0.625mx0.90m culvert at ch.1960m&2350m on the same road. IRIDP-2 amtali 504093019 1.00 72.22 M/S. Kamal Enterprise 61.02 24/11/2016 13/05/2018 100 30/04/2019
294 IRIDP-2/BGN/DW-32 (a)Improvement of Dulpukuria bridge-H/o Awalad Advocate.road ( Ch.00m-600m)(b) Construction of 01nos 0.625mx0.90m culvert at ch.365m on the same road. IRIDP-2 amtali 504094029 0.60 39.74 Md. Sahidul Islam 34.38 24/11/2016 07/06/2017 100 30/04/2019
295 IRIDP-2/BGN/DW-33 (a)Improvement of Khekuani Bazar-Haridrabaria DKS Dhakile Madrasha via Gulishakhali Bazar&Abdul Gini Dhakile Madrasha. road( Ch.1897m-2400m)(b) Construction of 01nos 0.625mx0.90m culvert at ch.2210m on the same road. IRIDP-2 amtali 504094054 0.50 28.97 M/S, Musolli Construction 24.04 24/11/2016 20/11/2017 100 30/04/2019
296 IRIDP-2/BGN/SDW-71 (a)Improvement of Ramna bridge at Soiyod doctor house to Altaf mashter house road [Ramna Ser E Bangla Secondary School infront of bridge west side main road to sattar Dr.madrasha – Golaghata karaitala bhitulla jam e mosque Dawatala karaitala GPS – Anower khan jame mosque road] (Ch.00m - 1443m.) ID NO. 504194114(b) Construction of 01nos 1.50mx1.50m culvert at ch.675m on the same road.(c) Construction of 02nos 0.625mxm culvert at ch.950m,1080m on the same road. IRIDP-2 bamna 504194114 1.44 111.88 Md. Golam Sarower 106.28 31/01/2019 08/06/2019 10 13/05/2019
297 IRIDP-2/BGN/DW-40 (a)Improvement of Bamna UP – Sonakhali Bazar via Hanif house road ( Ch.1000m-2200m)(b) Construction of 02nos 1.60mx1.60m culvert at ch.1350m & 1760m on the same road. IRIDP-2 bamna 504193010 1.20 65.21 M/S. Khan Enterprise 65.21 18/12/2016 30/12/2017 100 12/05/2019
298 IRIDP-2/BGN/DW-24 Improvement of Niz Amtali Madrasha RHD – Madu Chairman house UZR (Sonakhali Bazar RHD to Bamna Kholpatua GC road) road ( Ch.00m-1800m) IRIDP-2 bamna 504195007 1.80 80.61 M/S. Al-Mamun Enterprise LTD 68.44 04/10/2016 08/12/2017 100 12/05/2019
299 IRIDP-2/BGN/DW-1 Improvement of Ramna UP-Dawatala UP (Battala Culvert) via Golagata Karaitala GPS road (Ch. 00-690m). IRIDP-2 bamna 504193011 0.69 37.84 M/S Masum Billah Enterprise 32.19 21/01/2016 30/06/2016 100 06/05/2019
300 IRIDP-2/BGN/DW-2 Improvement of Gudighata Bazar-Napitbari Bridge RHD via Hemayet Member Bari road (Ch. 00-695m). IRIDP-2 bamna 504195035 0.70 38.09 M/S Masum Billah Enterprise 32.15 21/01/2016 30/06/2016 100 06/05/2019
301 IRIDP-2/BGN/DW-22 (a)Improvement of South side of Chalitabunia Khal - WAPDA Beribandth -House of Hawlader Bari -Laxipura GPS road.(Ch.00m - 1414m.)(b) Construction of 02nos 1.50mx1.50m culvert at ch.400m & 1250m on the same road. IRIDP-2 bamna 504194004 1.41 85.38 M/S. Rupali Construction 68.52 08/10/2016 16/11/2017 100 06/05/2019
302 IRIDP-2/BGN/DW-23 (a)Improvement of Gudighata Bazar-Napitbari Bridge RHD via Hemayet Member Bari road (Ch. 695m – 1770m)(b) Construction of 02nos 0.625mx0.60m culvert at ch.1116m & 1555m on the same road. IRIDP-2 bamna 504195035 1.08 60.71 M/S. Rupali Construction 47.47 04/10/2016 05/03/2017 100 06/05/2019
303 IRIDP-2/BGN/MW-73 (a)Maintenance of Fuljhuri GC-Gaurichanna-Ghotbaria-Ayla GC road (Ch.5820m - 7820m.) ID NO. 504282008(b) Construction of 02nos 0.625mx0.900m culvert at ch.6130m,6397m on the same road. IRIDP-2 barguna-s 504282008 2.00 68.59 M/S. Ema Traders 65.16 09/04/2019 17/10/2019 0 06/05/2019
304 IRIDP-2/BGN/MW-74 Maintenance of Burirchar UP-Hazarbigha-Kamrabad-Purakata hat Road (Ch.8194m - 10559m.) ID NO. 504473001 IRIDP-2 barguna-s 504283001 2.37 68.20 M/S. Zitu Enterprise 64.79 0 06/05/2019
305 IRIDP-2/BGN/MW-56 Maintenance of Burirchar UP-Hazarbigha-Kamrabad-Purakata hat road .(Ch.4500m - 5500m.) ID NO. 504283001 IRIDP-2 barguna-s 504283001 1.00 27.96 M/S. Mithun Traders 25.16 30/08/2017 15/01/2018 100 05/05/2019
306 IRIDP-2/BGN/MW-58 (a)Maintenance of Razzak Master House - Naltona UHC road.(Ch.00m - 500m.) ID NO. 504285219(b) Construction of 01nos 0.625mx0.60m culvert at ch.120m on the same road. IRIDP-2 barguna-s 504285219 0.50 12.76 M/S. Khan Enterprise 11.48 01/01/2018 05/06/2018 100 05/05/2019
307 IRIDP-2/BGN/DW-25 (a)Improvement of Bushbunia UZR - Kalirtabok Sluice - Rayertabok H/S (Cyclone Shelter) road.(Ch.00m - 650m.)(b) Construction of 02nos 0.625mx0.60m culvert at ch.200m & 253m on the same road. IRIDP-2 barguna-s 504284054 0.65 42.88 M/S, Musolli Construction 35.15 06/02/2017 30/04/2018 100 05/05/2019
308 IRIDP-2/BGN/DW-27 (a)Improvement of Babugonj GC- Padma (Sonatola ) road.(Ch.00m - 2000m.)(b) Construction of 01nos 0.625mx0.60m culvert at ch.720m on the same road.(c) Construction of 01nos 3.0mx3.0m culvert at ch.1643m on the same road. IRIDP-2 barguna-s 504284048 2.00 100.72 M/S. Humayun Enterprise 85.33 24/11/2016 30/06/2018 100 05/05/2019
309 IRIDP-2/BGN/DW-60 (a)Improvement of Bhutmara khalgora-Sluice gate ( Monoshatoli GPS) road.(Ch.00m - 1000m.) ID NO. 504285039(b) Construction of 02nos 0.625mx0.60m culvert at ch.167m & 730m on the same road. IRIDP-2 barguna-s 504285039 1.00 64.82 M/S Poly Construction 58.34 20/02/2018 11/11/2018 100 05/05/2019
310 IRIDP-2/BGN/DW-62 (a)Improvement of Napilkhli WDB-Batala Madrasha road.(Ch.00m - 1350m.) ID NO. 504285015(b) Construction of 04nos 0.625mx0.90m culvert at ch.70m,153m,420m & 905m on the same road. IRIDP-2 barguna-s 504285015 1.35 89.39 M/S. Mithun Traders 80.45 07/03/2018 12/12/2018 100 05/05/2019
311 IRIDP-2/BGN/MW-54 Maintenance of Parir khal GC - Babugong GC road .(Ch.12350m - 14010m.) ID NO. 504282006 IRIDP-2 barguna-s 504282006 1.66 38.63 Md. Golam Kibria 34.77 29/08/2017 10/07/2018 50 05/05/2019
312 IRIDP-2/BGN/DW-59 (a)Improvement of Barguna-Chalitatali UZR (Shop of Sekander Mistree)-Chanderhat UNR road.(Ch.00m - 1700m.) ID NO. 504285324(b) Construction of 02nos 1.0mx1.0m culvert at ch.630m & 993m on the same road.(c) Construction of 01nos 0.625mx0.90m culvert at ch.140m on the same road. IRIDP-2 barguna-s 504285324 1.70 117.32 M/S. Mithun Traders 105.59 20/02/2018 30/05/2019 70 05/05/2019
313 IRIDP-2/BGN/DW-61 (a)Improvement of Rayer Tabak High School West Side Forhad Forazir Bari Via Golbunia Bazar road.(Ch.00m - 800m.) ID NO. 504285283(b) Construction of 01nos 1.50mx1.50m culvert at ch.04m on the same road.(c) Construction of 03nos 0.625mx0.60m culvert at ch.300m,430m & 760m on the same road. IRIDP-2 barguna-s 504285283 0.80 58.43 M/S. Mithun Traders 52.59 07/03/2018 30/05/2019 70 05/05/2019
314 IRIDP-2/BGN/DW-66 (a)Improvement of Nali GC-Babugonj GC road.(Ch.4600m - 6100m.) ID NO. 504282009(b) Construction of 04nos 0.625mx0.90m culvert at ch.560m,740m,980m,1195 on the same road. IRIDP-2 barguna-s 504282009 1.50 119.95 M/S. Shamdder Construction 113.96 05/11/2018 13/06/2019 45 05/05/2019
315 IRIDP-2/BGN/DW-68 Improvement of Nali GC-Babugonj GC road. (Ch.6100m-710m) ID NO.504282009(b) Construction of 01 nos 0.625mx0.90m culvert at ch.6285 on the same road. IRIDP-2 barguna-s 504282009 1.01 84.98 M/S. Azad Treders 80.73 05/11/2016 13/05/2019 45 05/05/2019
316 IRIDP-2/BGN/MW-16 Maintenance of Keorabunia RHD-Ghatbaria Hat-Chandukhali GC, road (Ch. 5600m-7345m) IRIDP-2 barguna-s 504283003 1.75 45.18 M/S Md.Delwar Hossain 40.00 29/03/2016 06/10/2016 100 30/04/2019
317 IRIDP-2/BGN/DW-9 (a)Improvement of Khajurtala RHD-Dakhhin Khajurtala GPS-Kumrakhali S K Roy GPS-Bowalkar GCC (Khajurtala –Kumarkhali Ali mia house)Road.(Ch.300m-2300m.) (b) Construction of 04nos 0.625mx0.90m culvert at ch.1660m,1960m 2064m& 2210m on the same road. IRIDP-2 barguna-s 504284018 2.00 93.61 M/S. Kamal Enterprise 85.99 20/03/2016 02/11/2016 100 30/04/2019
318 IRIDP-2/BGN/DW-15 (a)Improvement of Parirkhal GC-Chalitatali GC-Chowmuhoni-Nali (Chalitatali Chowmuhoni Part) GC Road.(Ch.6965m-7870m.) (b) Construction of 01no 0.625mx0.60m culvert at ch.7500m on the same road. IRIDP-2 barguna-s 504282011 0.91 64.02 M/S Limon traders 57.30 29/03/2016 05/12/2016 100 30/04/2019
319 IRIDP-2/BGN/MW-16 Maintenance of Keorabunia RHD-Ghatbaria Hat-Chandukhali GC, road (Ch. 5600m-7345m) IRIDP-2 barguna-s 504283003 1.75 45.18 M/S Md.Delwar Hossain 40.00 29/03/2016 06/10/2016 100 30/04/2019
320 IRIDP-2/BGN/DW-26 (a)Improvement of Keorabunia UP-Ayla GC-Sonarbangla-Naya Hat-Purakata hat road.(Ch.9250m - 10250m.)(b) Construction of 02nos 0.625mx0.60m culvert at ch.9562m & 10090m on the same road. IRIDP-2 barguna-s 504283012 1.00 60.53 M/S. Humayun Enterprise 51.30 24/11/2016 15/02/2018 100 30/04/2019
321 IRIDP-2/BGN/DW-50 (a)Improvement of Cotto Gourichanna Dakhil Madrasha-Azimuddin House road.(Ch.1000m - 1400m.) ID NO. 504285145(b) Construction of 01nos 0.625mx0.60m culvert at ch.1060m on the same road. IRIDP-2 barguna-s 504285145 0.40 19.87 M/S. Palli Stores,Pro. Md. Golam Sawrar (Badal) 17.92 05/09/2017 09/01/2018 100 30/04/2019
322 IRIDP-2/BGN/DW-51 (a)Improvement of Bara Labangola-Sonakhali Pourashava road.(Ch.00m - 2725m.) ID NO. 504284008(b) Construction of 05nos 0.625mx0.60m culvert at ch.246m,846m,1365m,2178m & 2390m on the same road.(c) Construction of 01nos 2.0mx2.0m culvert at ch.1669m on the same road. IRIDP-2 barguna-s 504284008 2.73 162.56 M/S. Mithun Traders 146.30 13/11/2017 27/03/2018 100 30/04/2019
323 IRIDP-2/BGN/DW-52 (a)Improvement of Baro Labangola WDB-Khorshed Ali House road .(Ch.00m - 1750m.) ID NO. 504284010(b) Construction of 03nos 0.625mx0.60m culvert at ch.950m,1150m& 1360m on the same road. IRIDP-2 barguna-s 504284010 1.75 98.72 M/S. Mithun Traders 98.34 25/09/2017 05/04/2018 100 30/04/2019
324 IRIDP-2/BGN/DW-53 (a)Improvement of Maitha GPS East Side - Kaderer Pule road .(Ch.00m - 1715m.) ID NO. 504285289(b) Construction of 02nos 0.625mx0.60m culvert at ch.100m& 360m on the same road. IRIDP-2 barguna-s 504285289 1.72 95.35 M/S. Mithun Traders 95.18 27/09/2017 06/05/2018 100 30/04/2019
325 IRIDP-2/BGN/MW-55 Maintenance of Barguna UZ HQ - Kakchira GC Via Fuljhuri GC Road(Sadar Part) road .(Ch.9250m - 10250m.) ID NO. 504282003 IRIDP-2 barguna-s 504282003 1.00 26.93 Md. Golam Kibria 24.24 29/08/2017 15/01/2018 100 30/04/2019
326 IRIDP-2/BGN/DW-44 Improvement of Karuan Faker Master house- Barguna Betagi RHD road.(Ch.1487m - 2500m.) ID NO. 504474156 IRIDP-2 betagi 504474156 1.01 56.89 Rafiq Construction Co. 51.20 06/07/2017 30/12/2018 100 13/05/2019
327 IRIDP-2/BGN/DW-43 Improvement of Sharishamuri UP office-Gourichanna via Zumaddar Bari road.(Ch.00m - 893m.) ID NO. 504474262 IRIDP-2 betagi 504474262 0.89 49.02 M/S. Khan Enterprise 44.12 10/07/2017 31/03/2019 70 13/05/2019
328 IRIDP-2/BGN/DW-45 Improvement of Aurbunia Kheyaghat(UZR) - Niamati khal road.(Ch.00m - 1010m.) ID NO. 504474018 IRIDP-2 betagi 504474018 1.01 56.05 Rafiq Construction Co. (Pvt.) Ltd 50.44 06/07/2017 30/12/2018 45 13/05/2019
329 IRIDP-2/BGN/DW-46 Improvement of Betagi UZ HQ-Badnikhali GC road.(Ch.2700m - 3627m.) ID NO. 504472003 IRIDP-2 betagi 504472003 0.93 50.00 Rafiq Construction Co. (Pvt.) Ltd 45.00 07/07/2017 30/12/2018 70 13/05/2019
330 IRIDP-2/BGN/DW-47 Improvement of Betagi UP(Utter RanipurGPS)-Jagaikhal Bazar(Police Inspection Centre)road.(Ch.00m - 1470m.) ID NO. 504474233(b) Construction of 01nos 0.625mx0.90m culvert at ch.1100m on the same road. IRIDP-2 betagi 504474233 1.47 96.07 M/S. Tareque Enterprise 91.27 08/07/2018 30/06/2019 50 13/05/2019
331 IRIDP-2/BGN/DW-57 Improvement of Bibicini UP – Katakhali scluice ghat bazar road.(Ch.1880-2600m.) ID NO. 504474263Construction of 2 nos. 0.625mX0.900m Culvert at Ch. 1100m & 2050m on the same road.Construction of 1 no. 3.00mX3.00m Culvert at Ch. 1883m on the same road. IRIDP-2 betagi 504474263 0.72 45.04 45.04 05/09/2017 30/05/2019 50 13/05/2019
332 IRIDP-2/BGN/SDW-65 Improvement of Aurbunia Kheyaghat(UZR) - Niamati khal Via Pollymongol Bazar road.(Ch.1010m - 1430m.) ID NO. 504474018 & Link road 85.0m IRIDP-2 betagi 504474018 0.51 30.91 M/S. R S Business Center 32.46 28/03/2018 30/07/2019 50 13/05/2019
333 IRIDP-2/BGN/SDW-70 (a)Improvement of Laxmipura Madrasha(Laxmipur Bazar)-Bibichini UNR via Khalifabari road.(Ch.585m - 2850m.) ID NO. 504474144(b) Construction of 02nos 3.50mx3.50m culvert at ch.1833m & 2383m on the same road.(c) Construction of 01nos 2.60mx2.00m culvert at ch.2257m on the same road. IRIDP-2 betagi 504474144 2.27 202.68 M/S. Mubin Traders 192.55 06/01/2019 14/11/2019 25 13/05/2019
334 IRIDP-2/BGN/SDW-72 (a)Improvement of Betagi UPC-Laxmipura Bazar (Ch.3300m - 4635m.) ID NO. 504473001(b) Construction of 02nos 2x3.0mx3.0m culvert at ch.4425m,4590 on the same road.(c) Construction of 01nos 0.625mx0.900m culvert at ch.4210m on the same road. IRIDP-2 betagi 504473001 1.34 122.93 M/S. Asia Enterprise 116.78 20/02/2019 25/06/2019 10 13/05/2019
335 IRIDP-2/BGN/DW-41 Improvement of Kadamtola Bazar- Goalbari Sluicegate road.(Ch.00m - 1900m.) IRIDP-2 betagi 504474319 1.90 107.02 M/S. Khan Enterprise 91.40 23/01/2017 29/03/2018 100 12/05/2019
336 IRIDP-2/BGN/DW-42 Improvement of Betagi-Niamati UZR (Putiakhali Bazar) to Gariabunia Bazarroad.(Ch.500m - 1500m.) IRIDP-2 betagi 504474308 1.00 53.40 44.86 23/01/2017 25/01/2018 100 12/05/2019
337 IRIDP-2/BGN/DW-49 a) Improvement of Amragasia RHD (Basunda Adasha GPS)-WAPDA Bazar via South Volanathpur GPS road (Ch.00m-700m.) ID NO.504474133(b) Construction of 01nos 2x3.0mx3.0m culvert at ch.298m on the same road. IRIDP-2 betagi 504474133 0.70 53.48 M/S. Abul Kalam Azad 48.14 03/08/2017 30/05/2018 100 12/05/2019
338 IRIDP-2/BGN/DW-13 (a)Improvement of Kawnia RHD (Mobile Tower) - Mirzagonj RHD Via Al Modina Hafizia Madrasha (ch.1080m – 2400m) (b) Construction of 01no 2*3.0m*3.60m culvert at ch.1530 on the same road. (c) Construction of 01no 3.0m*3.0m culvert at ch.1880m on the same road. IRIDP-2 betagi 504474017 1.32 112.81 M/S. Humayun Enterprise 93.41 28/03/2016 07/08/2016 100 12/05/2019
339 IRIDP-2/BGN/DW-18 Improvement of Mayer Hat (UZR)-Gaurichanna Bazar road.(Ch.2265m - 3121m.) IRIDP-2 betagi 504474096 0.86 50.00 M/S. Gazi Construction 45.96 23/01/2017 27/02/2019 100 12/05/2019
340 IRIDP-2/BGN/DW-3 Improvement of Fultala WAPDA Bazar-Shantirhat Bazar-Bibichini UP Office road (Ch. 2850-3744m). IRIDP-2 betagi 504473020 0.89 48.06 M/S Khan Enterprise 43.44 11/04/2016 17/12/2016 100 06/05/2019
341 IRIDP-2/BGN/DW-4 Improvement of Betagi UP-Hosnabad UP Office via Goalbari GPS road (Ch. 6319.5 - 7150m). IRIDP-2 betagi 504473004 0.83 46.01 M/S Poly Construction 43.37 03/02/2016 25/02/2017 100 06/05/2019
342 IRIDP-2/BGN/DW-5 Improvement of Mokamia UP Office (Masuakhali bazar) – Betagi borguna RHD via Chotto Mokamia-(Battala) road (Ch. 3315-4150m). IRIDP-2 betagi 504474239 0.84 46.16 M/S Poly Construction 43.63 03/02/2016 28/02/2017 100 06/05/2019
343 IRIDP-2/BGN/DW-14 (a)Improvement of Buramazumder UP office-Mirzagonj Border via house of Barake Mirdha (ch.880m – 2080m) (b) Construction of 01no 0.625mx0.90m culvert at ch.1180m on the same road. IRIDP-2 betagi 504474276 1.20 67.78 M/S Khan Enterprise 56.49 11/04/2016 11/04/2017 100 06/05/2019
344 IRIDP-2/BGN/SDW-19 Improvement of Let. Abdus Salam khan (Kasem) Road(Ch.00m-490m.) IRIDP-2 betagi 504475040 0.49 23.78 M/S Khan Enterprise 23.63 29/05/2016 15/05/2017 100 06/05/2019
345 IRIDP-2/BGN/DW-36 (a)Improvement of Charduani UP-Tengra Bazar road (Ch. 4675m – 5875m)(b) Construction of 01nos 0.625mx0.90m culvert at ch.4687m on the same road. IRIDP-2 patharghata 504853005 1.20 71.04 M/S. Modina Traders 63.32 07/12/2016 07/12/2018 100 13/05/2019
346 IRIDP-2/BGN/DW-39 (a)Improvement of Patharghata-Kakchira RHD (Akon Bari Battala)-Pachim Kupdhon (Imdad Master Bari) road ( Ch.00m-1700m)(b) Construction of 01nos 1.60mx1.60m culvert at ch.399m on the same road.(c) Construction of 03nos 0.625mx0.90m culvert at ch.295m,1150m & 1360m on the same road. IRIDP-2 patharghata 504855151 1.70 92.59 GM Ikfa Enterprise 82.17 07/12/2016 16/07/2018 100 13/05/2019
347 IRIDP-2/BGN/DW-38 (a)Improvement of Kathaltali UP (Keramotpur RHD) -Kamarer Hat road ( Ch.2950m-4930m)(b) Construction of 02nos 0.625mx0.90m culvert at ch.3694m & 4195m on the same road. IRIDP-2 patharghata 504853021 1.98 121.78 M/S. F.K Construction 121.78 07/12/2016 30/05/2019 70 13/05/2019
348 IRIDP-2/BGN/DW-48 a) Improvement of Patharghata-Barguna RHD (Alisar More Munshi Bari) Azimpur Bazar via Singrabunia GPS road(Ch.00-1500m)ID NO.504854072(b) Construction of 021nos 0.625mx0.600m culvert at ch.183m & 663m on the same road. IRIDP-2 patharghata 504854072 1.50 88.58 M/S. K.K. Enterprise, Pro. Md. Kabir Hossain 79.72 31/10/2017 28/02/2019 60 13/05/2019
349 IRIDP-2/BGN/DW-67 (a)Improvement of Charduani GC-Kathaltali UP (RHD) road.(Ch.1226m - 3660m.) ID NO. 504852004(b) Construction of 06nos 0.625mx0.90m culvert at ch.1338m,1678m, 2342m, 2948m, 3038m, 3540 on the same road. IRIDP-2 patharghata 504852004 2.43 202.72 Trinath Kormokar 197.65 11/11/2018 19/08/2019 60 13/05/2019
350 IRIDP-2/BGN/DW-69 Improvement of Patherghata UP (RHD Kazi bari) Khaliferhat via Hatempur Bazar road. (Ch. 710m-2055m) ID NO. 504853017 IRIDP-2 patharghata 504853017 1.35 95.90 M/S. Shamdder Construction 91.11 05/11/2018 13/05/2019 50 13/05/2019
351 IRIDP-2/BGN/DW-37 (a)Improvement of Nali Bazar-Nachnapara Bazar via North Katakhali Comunity Primary School.road ( Ch.00m-1557m)(b) Construction of 01nos 1.60mx1.60m culvert at ch.785m on the same road.(c) Construction of 01nos 0.625mx0.90m culvert at ch.950on the same road. IRIDP-2 patharghata 504854050 1.56 76.66 M/S. FH Enterprise 63.58 24/11/2016 31/12/2017 100 12/05/2019
352 IRIDP-2/BGN/DW-6 Improvement of Mathertali FRB-Chalabhanga Darber Sharif road (Ch. 00-544m). IRIDP-2 patharghata 504854069 0.54 34.28 M/S Jami Enterprise 29.75 26/01/2016 25/03/2017 100 06/05/2019
353 IRIDP-2/BGN/DW-7 (a)Improvement of Jamirtala (Raton Member house) - House of Harun Mawlana via Keraitala (Altaf Chairman) road (Ch. 00-1375m). (b) Construction of 03nos 0.625mx0.60m culvert at ch.360m,730m & 994m on the same road. IRIDP-2 patharghata 504854073 1.38 64.53 M/S Jami Enterprise 56.11 26/01/2016 25/03/2017 100 06/05/2019
354 IRIDP-2/BGN/DW-8 (a)Improvement of Old Kalmega UP-Munsigonj Bazar via Sonali Madrasha road (Ch. 1500-2280). (b) Construction of 01no 1.6mx1.6m culvert at ch.1825m on the same road. (c)Construction of 01no 0.625mx0.60m culvert at ch.2178m on the same road. IRIDP-2 patharghata 504853012 0.78 47.18 M/S Rudra Enterprise 40.09 26/01/2016 10/05/2018 100 06/05/2019
355 IRIDP-2/BGN/DW-35 (a)Improvement of Old Kalmegha UP-Munshigonj Bazar via Sonali Madrasha road.(Ch.2280m - 3500m.)(b) Construction of 01nos 3.0mx3.00m culvert at ch.2840m on the same road.(c) Construction of 02nos 0.625mx0.90m culvert at ch.2915m& 3100 on the same road. IRIDP-2 patharghata 504853012 1.22 76.01 M/S. Akon Traders 66.00 07/12/2016 31/12/2017 100 06/05/2019
356 IRIDP-2/BGN/DW-12 (a)Improvement of Taltali-Chairmanhat via Newpara Launchghat, H/O Nasir Mollah & Behala High School (Haribaria sanur bridge - H/O Abjal via Behala GPS) road ( ch.2000m - 3000m) (b) Construction of 02nos 0.625mx0.60m culvert at ch.2325m&3000m on the same road. IRIDP-2 Taltali 504874113 1.00 59.47 M/S Poly Construction 55.68 01/03/2016 10/02/2017 100 05/05/2019
357 IRIDP-2/BGN/DW-64 Construction of Ghatla with 300m Approch road on the bank of Andarmanik at Dhaka Kuakata RHD (Mohipur GC) - Taltali GC road via Nishanbaria kheyaghat. ID NO. 504872014 IRIDP-2 Taltali 504872014 84.65 M/S. Arif & Asif Construction 84.22 12/04/2018 17/04/2019 100 05/05/2019
358 IRIDP-2/BGN/RDW-34 (a)Improvement of Horinbaria (sanur bridge) – Afzal house via behala GPS road. ( Ch.3000m-4000m) (b) Construction of 03nos 0.625mx0.90m culvert at ch.3005m,3550m&3850m on the same road. IRIDP-2 Taltali 504874113 46.33 Ahurujjaman Khan Almas 44.02 01/01/2019 20/06/2019 50 05/05/2019
359 IRIDP-2/BGN/MW-21 Maintenance of Bogir hat GC-Taltali GC via taltali Digree collage road (Ch.00m-908m) IRIDP-2 Taltali 504872004 0.91 49.79 M/S. Gazi Construction 38.92 04/10/2016 30/03/2017 100 30/04/2019
360 IRIDP-2/BGN/DW-34 Improvement of Horinbaria (sanur bridge) – Afzal house via behala GPS road. ( Ch.3000m-4000m) IRIDP-2 Taltali 504874113 1.00 18.40 M/S Masum Billah Enterprise 18.40 24/11/2016 12/09/2016 100 30/04/2019
361 e-Tender/NBIDNNGPS/BAR/AMT/2017-2018/W1-00369 MODDHO TEPURA PRIMARY SCHOOL NBIDNNGPS amtali 72.21 M/S. Sohel Traders 68.60 14/08/2018 27/05/2019 0  
362 e-Tender/NBIDNNGPS/BAR/AMT/2017-2018/W1-00370 MAITHA PRIMARY SCHOOL NBIDNNGPS amtali 72.70 Mrs. Jahanara Islam 69.06 14/08/2018 25/05/2019 0  
363 e-Tender/NBIDNNGPS/BAR/AMT/2017-2018/W1-00371 CHOWRA LODA PRIMARY SCHOOL NBIDNNGPS amtali 72.19 Md. Allauddin Mirdha 68.58 14/08/2018 27/05/2019 0  
364 e-Tender/NBIDNNGPS/BAR/AMT/2017-2018/W1-00372 UTTAR POCHIM TOKTABUNIYA PRIMARY SCHOOL NBIDNNGPS amtali 79.17 M/S Mahi Enterprise 75.03 14/08/2018 27/08/2019 0  
365 e-Tender/NBIDNNGPS/BAR/AMT/2017-2018/W1-00373 PATAKATA NURUL HAQUE PRIMARY SCHOOL NBIDNNGPS amtali 81.00 M/S. Saleha Enterprise 76.95 0  
366 e-Tender/NBIDNNGPS/BAR/AMT/2017-2018/W1-00501 POCHIM NACHNAPARA PRIMARY SCHOOL NBIDNNGPS amtali 79.03 Gazi Faruque Ahammed 75.08 14/08/2018 27/08/2019 0  
367 e-Tender/NBIDNNGPS/BAR/AMT/2017-2018/W1-00502 UTTAR PASCHIM CHILA NBIDNNGPS amtali 138.46 Mr. Ahurujjaman khan Almas 131.54 0  
368 e-Tender/NBIDNNGPS/BAR/AMT/2018-2019/W1-02086 UTTAR CHUNA KHALI PRIMARY SCHOOL NBIDNNGPS amtali 30.76 M/S Mohona Enterprise 29.23 0  
369 e-Tender/NBIDNNGPS/BAR/AMT/2018-2019/W1-02087 MODDHO SONAKAHALI PRIMARY SCHOOL NBIDNNGPS amtali 82.88 Gazi Mozmmel Haque 78.74 0  
370 e-Tender/NBIDNNGPS/BAR/BAR/2017-2018/W1-01235 MODDHO SHAHERB HAWLA PRIMARY SCHOOL NBIDNNGPS barguna-s 102.84 M/S. Mohona Enterprise 97.60 14/06/2018 21/04/2018 0  
371 e-Tender/NBIDNNGPS/BAR/BAR/2017-2018/W1-01240 FUL TOLA PRIMARY SCHOOL NBIDNNGPS barguna-s 84.09 M/S. Sharmin Construction 79.89 02/07/2018 29/07/2019 0  
372 e-Tender/NBIDNNGPS/BAR/BAR/2017-2018/W1-01241 BADARKAHLI BISAR FASKHOLA PRIMARY SCHOOL NBIDNNGPS barguna-s 83.15 M/S. Khokon Traders 78.99 11/06/2018 14/06/2018 0  
373 e-Tender/NBIDNNGPS/BAR/BAR/2017-2018/W1-01243 CHOTO GOURICHANNA RUPNOGAR COM. PRIMARY SCHOOL NBIDNNGPS barguna-s 73.31 M/S. Mahi Enterprise 69.65 24/06/2018 04/04/2019 0  
374 e-Tender/NBIDNNGPS/BAR/BAR/2017-2018/W1-01245 MADHYA LEMUA NBIDNNGPS barguna-s 71.30 M/S. Othoi Enterprise 67.74 24/06/2018 04/04/2019 0  
375 e-Tender/NBIDNNGPS/BAR/BAR/2017-2018/W1-01246 COLLISH KAUNIA COMMIUNITY PRIMARY SCHOOL NBIDNNGPS barguna-s 83.07 M/S. Jayeda Enterprise 78.91 14/06/2018 21/06/2019 0  
376 e-Tender/NBIDNNGPS/BAR/BAR/2018-2019/W1-02011 AMORTOLA DOKKHIN FUL DHALUYA PRIMARY SCHOOL NBIDNNGPS barguna-s 83.57 M/S. Rezaul Kabir Traders 79.39 0  
377 e-Tender/NBIDNNGPS/BAR/BAR/2018-2019/W1-02084 UTTER BARO GOURICHANNA COMMUNITY PRIMARY SCHOOL NBIDNNGPS barguna-s 100.19 M/S. Azad Traders 95.18 0  
378 e-Tender/NBIDNNGPS/BAR/PAT/2017-2018/W1-00503 HOGLAPASA ADARSO PRIMARY SCHOOL NBIDNNGPS patharghata 128.60 M/S Rudra Enterprise 122.17 30/07/2018 11/05/2019 40  
379 e-Tender/NBIDNNGPS/BAR/PAT/2017-2018/W1-00505 UTTAR BETMOR PRIMARY SCHOOL NBIDNNGPS patharghata 108.71 M/S Zaman & Brothers 103.27 30/05/2018 03/03/2019 5  
380 e-Tender/NBIDNNGPS/BAR/PAT/2017-2018/W1-00506 MODDHO GOLBUNIYA PRIMARY SCHOOL NBIDNNGPS patharghata 105.02 Md. Kayadur Rahman Manzu 99.77 30/05/2018 03/03/2019 32  
381 e-Tender/NBIDNNGPS/BAR/PAT/2017-2018/W1-01216 HOGLA PASABINA PARIN PRIMARY SCHOOL NBIDNNGPS patharghata 130.26 Md. Monir Hossain 123.74 05/08/2018 11/05/2019 5  
382 e-Tender/NBIDNNGPS/BAR/PAT/2017-2018/W1-01754 BADAMTOLA PRIMARY SCHOOL NBIDNNGPS patharghata 83.02 M/S. Hasan Enterprise 78.87 23/07/2018 11/05/2019 15  
383 RERMP-3/BA RGU/W-30 Maintenance of Rural Roads Barguna() RERMP-3 barguna-s N/A 38 1533.00 N/A 1533.00 40 586.00 38 26/12/2021 Ongoing
384 SP25318/Mirar Khal-Magan Khar Khal Subproject Sarderer khal re-excavation(ch.00-4250m) Boshirgudi khal re-excavation(ch.00-2280m) Madborer khal re-excavation(ch.00-1370m) Mouje Ali khal re-excavation(ch.00-1070m) Referenced line seciton(9 Nos.) SSSWRDP amtali   8.97 98 108.86 Subol Mazi 108.86 01/01/2018 28/01/2018 30/04/2018 100 107.28 98 30/11/2022 Completed
385 SP43040/Singkhali Khal Subproject Morichbunia khal(ch.00-5700m) Morichbunia Branch khal(ch.00-1900m) Referenced line section(7 Nos.) Bamboo bridge(7 Nos.) SSSWRDP amtali   7.60 93 89.67 Sunil Chandra Das Satter Khan 89.67 13/02/2019 11/04/2019 25/05/2019 100 83.64 93 30/11/2022 Completed
386 SP44103/Gotkhali-Chalitabunia Khal Subproject Ghotkhali khal (Ch.00-1000m) Referance Line (8 Nos.) Bamboo Bridge (4Nos.) Patakata Khal (Ch.00-7100m) Re-excavation of Katakhali khal (Ch-0.00m: to 3200.00m) 2022-23 Re-excavation of Bharanir khal (Ch-0.00m: to 2130.00m) 2022-23 Re-excavation of Jhinbunia khal (Ch-0.00m: to 3200.00m) 2022-23 Re-excavation of Boithakata khal (Ch-0.00m: to 1200.00m) 2022-23 Construction of 11 Reference-line sections in 4 canals, SP Identification sign board 2Nos. and SP Indication Post 2Nos 2022-23 SSSWRDP amtali   17.83 98 190.92 Uttam Kumar Md. Attaher 190.92 24/02/2019 30/04/2023 30/05/2023 100 188.43 98 30/11/2022 Completed
387 SP61010/Paschim Chila Subproject Re-exacavation of Gazir khal (Ch-0+000km to 7+300km) Re-exacavation of Dushumir Khal (Ch-0+000km to 1+000km) Re-exacavation of Dushumir Branch khal (Ch-0+000km to 1+455km) Re-exacavation of Rajersar Talukdar Barir khal (Ch-0+000km to 1+000km) Re-exacavation of Mia Gazir khal (Ch-0+000km to 2+936km) Re-exacavation of Mia Gazir Branch khal (Ch-0+000km to 1+281km) Re-exacavation of Charer khal (Ch-0+000km to 2+900km) Re-exacavation of Charer Branch khal (Ch-0+000km to 1+960km) Ref. Lined Section 19 Nos. On 8 Khals, And SP Identf. Signboard (2 nos.) Construction of WMCA office building, Office furniture, Electification works SSSWRDP amtali   19.83 100 179.27 Tuhin Ibrahim 177.22 08/02/2021 16/08/2021 30/04/2021 100 176.52 100 30/11/2022 Completed
388 SP61011/Purba Sonakhali Subproject WMCA Office & Others Re-exacavation of Simmir khal (Ch-0+000km to 3+753km) Re-exacavation of Krisnaramer Khal (Ch-0+000km to 2+105km) Re-exacavation of Krisnaramer Branch khal (Ch-0+000km to 0+630km) Re-exacavation of Vider khal (Ch-0+000km to 0+929km) Re-exacavation of Babrer khal (Ch-0+000km to 0+643km) Construction of 9 Nos. Reference Lined & SP Identification signboard SSSWRDP amtali   8.06 87 127.43 Selim Khan 125.37 08/02/2021 15/08/2021 30/04/2021 100 110.18 87 30/11/2022 Completed
389 SP43044/Garabunia Subproject Re-Excavation of Garabunia Belaler Khal(Ch.0+000 Km to 3+080 Km) Re-Excavation of Chalitabunia Belaler Khal (Ch.0+000 Km to 0+985 Km) Re-Excavation of Garabunia Branch 1 Khal (Ch.0+000 Km to 1+050 Km) Const. of 8 Nos Reference lined Section on 3 Khals, SP Identf. sign board 2 Nos. and SP Indication Post 2 Nos. Bauria Khal re-xcavation (Ch:0.00m - 4500.00m) 2023-24 Garabunia Khal re-xcavation (Ch:0.00m - 2500.00m) 2023-24 Const. of 08 Nos. Ref. lined Section on 02 Khals, SP Identf. sign board 2, SP Area Indication Post 2 Nos. | 2023-24 SSSWRDP amtali   12.11 100 106.89 LCS Presodent : Mst. Rabya Begum 106.90 14/03/2024 24/03/2024 28/05/2024 100 106.54 100 30/11/2022 Completed
390 SP44120/Jabbar Ali - Sharif Shimon Subproject Re-Excavation of Balaibunia Khal (Ch.0+000 Km to 3+200 Km) Re-Excavation of Balaibunia Branch Khal (Ch.0+00 Km to 1+000 Km) Re-Excavation of Mollapara Bill Khal (Ch.0+00 Km to 1+000 Km) Re-Excavation of Fulgazi Barir CAD Khal (Ch.0+00 Km to 1+200 Km) Const. of 10 Nos. Ref. lined Section on 4 Khals, SP Identf. sign board 2 Nos. and SP Indication Post 2 Nos. SSSWRDP amtali   6.40 71 55.65 LCS President- Nesaruddin Padha 55.65 18/04/2023 30/04/2023 27/05/2023 96 40.03 71 30/11/2022 Ongoing
391 SP62043/Kalank Bogi Subproject Re-excavation of Boga Khal (Ch.0+000 to Ch. 8+000 km) Re-excavation of Kalanka Khal (Ch. 0+000 to Ch. 3+702 km) Re-excavation of Bogi Khal (Ch. 0+000 to Ch. 1+500 km) Re-excavation of Nalganj Khal (Ch. 0+000 to Ch. 1+308 km) Re-excavation of Nalganj Branch Khal (Ch. 0+000 to Ch. 0+909 km) Re-excavation of Kumari Khal (Ch. 0+000 to Ch. 0+971 km) Re-excavation of Khiler Khal (Ch. 0+000 to Ch. 0+475 km) Const. of 17 Nos. Reference lined Section on 7 Khals, SP Identf. sign board 2 Nos., Demercation Post 78 Nos. and SP Indication Post 2 Nos. Const. of Culvert (2v-3.50m x 3.50m) on Kalanka Khal Construction of WMCA office SSSWRDP amtali   15.86 74 187.54 M/S Mohiuddin Ahmed 183.14 02/03/2023 24/03/2023 30/05/2023 70 136.05 74 30/11/2022 Ongoing
392 SP13049/Dawatala DR Subproject Construction of WMCA Building (Semi pacca) Re-excavation of Choto Bhaijora Khal (Ch: 0.00 - 1400 m) Re-excavation of Bhaijora Khal (Ch: 0.00 - 1025 m) Re-excavation of Darga Barir Khal (Ch: 0.00 - 1500 m) Re-excavation of Egor Khal (Ch: 0.00 - 925 m) Re-excavation of Hogol Patir Khal (Ch: 0.00 - 2400 m) and Provisional Sum. Reference Lined Section (11 nos.) and SP Identification Signboard (2 nos.) SSSWRDP bamna   7.25 100 82.94 M/S H S Engineerd 80.57 19/02/2020 20/08/2020 30/04/2020 100 80.42 100 30/11/2022 Completed
393 SP15290/Maitha Khal DR Subproject Amrajuri Khal re-excavation(ch.00-3500m) Khakbunia Khal re-excavation(ch.00-1485m) Koraitola Khal re-excavation(ch.00-1860m) Khejurtola Khal re-excavation(ch.00-1460m) Ehurchan Khal re-excavation(ch.00-1000m) Referenced Line section(11 Nos.) Bamboo bridge(11 Nos.) SSSWRDP barguna-s   9.30 100 91.73 Shree Nemai Chandra Md. Atick Hossen 92.24 18/02/2019 12/03/2019 18/05/2019 100 92.24 100 30/11/2022 Completed
394 SP15332/Baliatali DR Subproject Bara Balia Tali Khal Re-excavation(ch0.00-1200m) Baliatali Branch Khal Re-excavation(ch0.00-2160m) Agapara Branch Khal Re-excavation(ch0.00-300m) Paler Baliatali Khal Re-excavation(ch0.00-792m) Baliatali Thadamara Branch Khal Re-excavation(ch0.00-480m) Rarir Khal Re-excavation(ch0.00-365m) Ref. Lined Section 8 Nos. On 6 Khals, And SP Identf. Signboard (2 nos.) SSSWRDP barguna-s   5.29 100 42.71 Panu Mollick(President) Abdul Awaual 42.71 24/01/2021 17/02/2021 07/04/2021 100 42.35 100 30/11/2022 Completed
395 SP25324/Parir Khal Subproject Amlokitola khal re-excavation(ch.00-6100m) Bain Samerto khal re-excavation(ch.00-2000m) Referenced line section(8 Nos.) SSSWRDP barguna-s   8.10 100 102.11 Sonia akter 102.11 03/01/2018 18/01/2018 25/04/2018 100 101.94 100 30/11/2022 Completed
396 SP43029/Nur Ali-Burirchar Charakgachia Nolitolar khal re-excavation(ch.00-4500m) Charakgachia khal re-excavation(ch.00-3800m) Referenced line section(8 Nos.) Bamboo bridge(6 Nos.) SSSWRDP barguna-s   8.30 100 89.07 Salma Begum Md. Sagir Hossen 89.07 24/02/2019 12/03/2019 20/05/2019 100 88.93 100 30/11/2022 Completed
397 SP43030/Aylapatakata Sub-project Re-excavation of Lakshman Shikhari Khal (Ch-0+00km to 0+555km) Re-excavation of Panjur Khal (Ch-0+000km to 1+110km) Re-excavation of Gabtali Khal (Ch-0+000km to +720km) Re-excavation of Pakur Gachia Khal (Ch-0+000km to 2+200km) Re-excavation of Kewabunia Khal (Ch-0+000km to 0+990km) Ref. Lined Section 11 Nos. On 5 Khals, And SP Identf. Signboard (2 nos.) SSSWRDP barguna-s   5.57 100 72.77 Sanu Sikder Sirin 72.77 20/03/2022 28/03/2022 29/04/2022 100 72.59 100 30/11/2022 Completed
398 SP43034/Potka Khali Subproject Noli Bharani khal re-excavation(ch.2600-5950m) Noli Bharani Branch khal re-excavation(ch.00-2600m) Uttar Dhalvanga khal re-excavation(ch.00-1260m) Golbunia khal re-excavation(ch.00-985m) Tunibaria khal re-excavation(ch.00-700m) Referenced line section(11 Nos.) Bamboo bridge(11 Nos.) SSSWRDP barguna-s   8.89 100 81.28 Shapan Khaleq 81.86 20/02/2019 01/04/2019 25/05/2019 100 81.86 100 30/11/2022 Completed
399 SP43041/Sonbunia Subproject Aga Poddha khal re-excavation(ch.00-4700m) Ungaria khal re-excavation(ch.00-540m) Nolirdon khal re-excavation(ch.00-335m) Referenced line section(7 Nos.) Bamboo bridge (4 Nos.) SSSWRDP barguna-s   5.57 100 76.15 Yunus Akon Md. Sagir 76.15 25/03/2019 08/04/2019 25/05/2019 100 76.11 100 30/11/2022 Completed
400 SP61016/Raybhog Subproject Re-excavation of Rayvog Khal (Ch-0+000km to 0+822km) Re-excavation of Rayvog Branch Khal (Ch-0+000km to 0+535km) Re-excavation of Noli Chargachia Khal (Ch-0+200km to 4+340km) Re-excavation of Noli Chargachia Branch Khal (Ch-0+000km to 2+850km) Re-excavation of Kodom Tola Khal (Ch-0+000km to 3+100km) Re-excavation of Uttar khakbunia Khal (Ch-0+000km to 1+045km) Ref. Lined Section 13 Nos. On 7 Khals, And SP Identf. Signboard (2 nos.) Construction of WMCA office building SSSWRDP barguna-s   12.49 100 135.77 Sayed Ali Zahanara Begum 133.79 27/12/2021 23/01/2022 28/04/2022 100 133.49 100 30/11/2022 Completed
401 SP62046/Sonatala Subproject Re-excavation of Aga Padma Khal (Ch. 0+000 to Ch. 3+216 km) Re-excavation of Aga Padma Khal Br.1 (Ch. 0+000 to Ch. 1+205 km) Re-excavation of Aga Padma Khal-2 (Ch.0+000 to Ch.0+375 km) Re-excavation of Pritambar Khal (Ch. 0+000 to Ch. 2+130 km) Re-excavation of Sonatala Khal (Ch. 0+000 to Ch. 1+110m) Re-excavation of Sonatala Br-1 Khal (Ch. 0+000 to Ch. 0+750m) Re-excavation of Sonatala Br-2 Khal (Ch. 0+000 to Ch. 3+617m) Re-excavation of Sonatala Br-3 Khal (Ch. 0+000 to Ch. 0+460m) Re-excavation of Sonatala Br-4 Khal (Ch. 0+000 to Ch. 0+288m) Const. of 14 Nos Ref. lined Section on 9 Khal, SP Identf. sign board 2 Nos., Demarcation Post 36 Nos. and SP Indication Post 2 Nos. Construction of WMCA office SSSWRDP barguna-s   13.15 100 199.68 Mohammed eunus & Brothers (Pvt.) Ltd 197.34 20/03/2023 30/03/2023 30/05/2023 100 195.87 100 30/11/2022 Completed
402 SP42024/Nishanbari-Gazi Mahmud Subproject Gazi Mahmud Khal re-excavation (Ch:0.00 - 2900m) Rashidar Khal re-excavation (Ch:0.00 - 975.00m) Nishanbaria Branch-1 Khal re-excavation (Ch:0.00 - 1100.00m) Nishanbaria Branch-2 Khal re-excavation (Ch:0.00 - 500.00m) Const. of 08 Nos. Ref. lined Section on 4 Khals, SP Identf. sign board 2, SP Area Indication Post 2 Nos. SSSWRDP barguna-s   5.47 100 37.33 LCS Secretary : Mst. Sabina Begum 37.33 20/02/2024 27/02/2024 28/04/2024 100 37.30 100 30/11/2022 Completed
403 SP25308/Chhoto Mokamia-Bara Mokamia Subproject Houder khal re-excavation(ch.00-3200m) Houder branch khal-1re-excavation(ch.00-600m) Houder branch khal-2 re-excavation(ch.00-1300m) Houder branch khal-3 re-excavation(ch.00-1200m) Sarder jugir khal re-excavation(ch.00-1500m) Chorkhali khal re-excavation(ch.00-1525m) Kurular khal re-excavation(ch.00-600m) Referenced line section(12Nos.) SSSWRDP betagi   9.92 100 115.59 Zalil Khan 115.58 19/02/2020 16/01/2018 30/04/2018 100 115.28 100 30/11/2022 Completed
404 SP42016/Gabua Fultala Subproject Re-excavation of Modoner Khal (Ch-0+00km to 1+800km) Re-excavation of Baroir Khal (Ch-0+000km to 2.400km) Re-excavation of Jintala Khal (Ch-0+000km to 1+250km) Re-excavation of Gabua Branch Khal (Ch-0+000km to 0+850km) Re-excavation of Gabua Hawlader Barir Branch Khal (Ch-0+000km to 0+700km) Re-excavation of Shaner Branch Khal (Ch-0+000km to 0+900km) Ref. Lined Section 14 Nos. On 6 Khals, And SP Identf. Signboard (2 nos.) SSSWRDP betagi   7.90 96 47.90 Munni Akther Mst.Sania Begum 47.90 15/02/2022 28/02/2022 30/04/2022 100 46.46 96 30/11/2022 Completed
405 SP43048/Deshantarkathi-Gouribunia Subproject Re-excavation of Dasher Branch Khal-4 (Ch-0+000km to 1+100km) Re-excavation of Parer Branch Khal-1 (Ch-0+000km to 2+045km) Re-excavation of Parer Branch Khal-2 (Ch-0+000km to 0+500km) Re-excavation of Dasher Branch Khal-1 (Ch-0+00km to 0+770km) Re-excavation of Bamoner Branch Khal-1 (Ch-0+000km to 1+500km) Re-excavation of Bamoner Branch Khal-2 (Ch-0+000km to 0+900km) Re-excavation of Dasher Branch Khal-2 (Ch-000 m to 600 m) Ref. Lined Section 10 Nos. On 7 Khals, And SP Identf. Signboard (2 nos.) SSSWRDP betagi   7.41 98 69.84 Selina Khatun Md.Hannan Sikder 69.84 15/02/2022 28/02/2022 26/04/2022 100 68.61 98 30/11/2022 Completed
406 SP14182/Kawnia-Mirjaganj FCD Subproject Construction of WMCA Office SSSWRDP betagi   0.00 0 22.85 OTM 22.85 01/01/1900 0 0.00 0 30/11/2022 Ongoing
407 SP13071/Koralia-Hazir Khal DR Subproject Padda Sluicegate-Karomjatola khal re-excavation(ch.00-3100m) Gohorpur moddhokola-purbo Mirabari khal re-excavation(ch.00-2000m) Ruhita -majher khal re-excavation (ch. 00-1820 m) Koralia-Hazir khal re-excavation(ch.00-1400m) SSSWRDP patharghata   8.32 100 119.14 Tariqul Khan 126.23 29/03/2018 03/04/2018 30/04/2018 100 126.23 100 30/11/2022 Completed
408 SP15268/Kakchira DR Subproject Golbunia khal re-excavation(ch.00-3000m) Katakhali-Fakirhat khal re-excavation(ch.00-5270m) Referenced line section on Kakchira Varani Khal (8 Nos.) SSSWRDP patharghata   8.27 100 121.01 Sonkor Kormoker 121.88 27/02/2018 14/03/2018 30/04/2018 100 121.88 100 30/11/2022 Completed
409 SP25315/Kalmegha-Ghutabachha Subproject Choto Pathorghata khal re-excavation(ch.00-7100m) Choto Pathorghata branch khal re-excavation(ch.00-840m) Referenced line section SSSWRDP patharghata   7.94 100 122.92 Sohel 122.92 12/03/2018 15/03/2018 28/04/2018 100 122.68 100 30/11/2022 Completed
410 SP62044/Gandamara Subproject Re-excavation of Aowaler Khal (Ch.0+000 to Ch.2+058 km) Re-excavation of Gandamara Khal (Ch. 0+000 to Ch. 3+739 km) Const. of 6 Nos. Ref. lined Section on 2 Khals, SP Identf. sign board 2 Nos., Demercation Post 36 Nos. and SP Indication Post 2 Nos. Const. of Culvert (2v-2.50m x 3.00m) on Aowaler Khal Construction of WMCA office. (12.00m x 6.00m) SSSWRDP Taltali   5.79 66 121.39 M/S Mohiuddin Ahmed 116.95 27/03/2023 27/03/2023 30/05/2023 60 77.32 66 30/11/2022 Ongoing
411 SP62045/Gabtalir Khal Subproject Re-excavation of Baraitali Khal (Ch.0+000 to Ch.2+900 km) Re-excavation of Baraitali Branch Khal (Ch. 0+000 to Ch. 0+900 km) Re-excavation of Gabtalir Khal (Ch. 0+000 to Ch. 1+650 km) Re-excavation of Beduria Khal (Ch. 0+000 to Ch. 2+000 km) Const. of 7 Nos Reference lined Section on 4 Khal, SP Identf. sign board 2 Nos., Demarcation Post 34 Nos. and SP Indication Post 2 Nos. Construction of WMCA office. (12.00mx6.00m) SSSWRDP Taltali   7.45 98 130.24 Mohammed eunus & Brothers (Pvt.) Ltd 127.92 20/03/2023 30/03/2023 25/12/2023 100 126.57 98 30/11/2022 Completed
412 SP15333/Khatachora DR Subproject Re-excavation of Khatachora Khal (Ch: 0 to 4500 m) Re-excavation of Koraitola Khal (Ch: 0 to 2700 m) Ref. Line Section (8nos.) and SP Identification Signboard (2nos.) Jayal Bhanga Khal re-excavation (Ch:0.00 - 2600m) 2023-24 Beltala Khal re-excavation (Ch:0.00 - 2200.00m) 2023-24 Ratanilla Khal re-excavation (Ch:0.00 - 1200.00m) 2023-24 Bawltala Khal re-excavation (Ch:0.00 - 800.00m) 2023-24 Const. of 10 Nos. Ref. lined Section on 4 Khals, SP Identf. sign board 2, SP Area Indication Post 2 Nos. 2023-24 Construction of WMCA Office (12m X 6m) SSSWRDP Taltali   14.00 51 145.43 Sohag (President) Ali Akbar (Sec) 143.04 12/03/2024 22/03/2024 16/04/2021 43 74.19 51 30/11/2022 Ongoing
413 w.465 Construction of 3 no ramna UP Complex UCCP-2 bamna 100 127.39 125.92 05/03/2017 30/09/2018 100 125.70 100 09/08/2020 final
414 w.151 Construction of gouricanna UP Complex UCCP-2 barguna-s 100 115.86 107.11 25/11/2015 30/06/2017 100 105.17 100 09/08/2020 final
415 076/246 Cons. of fuljhuri up UCCP-2 barguna-s 100 81.00 81.69 08/01/2011 30/06/2015 100 180.90 100 10/07/2020 final
416 075/246 Cons. of keorabunia up UCCP-2 barguna-s 100 81.00 84.50 08/11/2010 30/11/2017 100 81.18 100 10/07/2020 revised & final+
417 058/176 Construction of betagi UP Complex UCCP-2 betagi 100 59.00 63.41 10/12/2012 31/12/2015 100 63.03 100 31/08/2020 final
418 w.206 Construction of 6 no kazirabad UP Complex UCCP-2 betagi 100 121.10 99.99 24/01/2016 30/09/2019 100 70.00 100 09/08/2020 final
419 077/246 Cons. of koraibaria up UCCP-2 Taltali 100 88.86 88.86 15/03/2010 14/09/2010 100 88.86 100 10/07/2020 final
420 CBU-100/ Purto-424 বরগুনা জেলার আমতলী উপজেলাধীন আমড়াগছিয়া বাজার জঐউ খেকুয়ানি গুলিশাখালী সড়ক ২০০মি. চেইনেজে(রোড আইডি ৫০৪০৯৪০৮১) সেতু নির্মাণ। UHBP amtali 504094081 66.00 0 691.76 M/S. Kohinoor Enterprise-S.Ananta Bikash Tripura(JV) 622.58 15/05/2022 19/05/2022 02/06/2024 90 490.00 0 28/09/2024  
421 CBU-100/ Purto-426 বরগুনা জেলার বামনা উপজেলাধীন সৈয়দ ড. এর বাড়ী থেকে আলতাফ মাষ্টারের বাড়ী সড়কে ১১০০মিটার চেইনেজে (রোড আইডি-৫০৪১৯৪১১৪) সেতু নির্মাণ। UHBP bamna 504194114 22.00 0 311.94 M/S. Kham Enterprise 244.76 16/03/2022 24/03/2022 30/06/2024 75 165.00 0 28/09/2024  
422 CBU-100/ Purto-233 বরগুনার জেলার সদর উপজেলাধীন সুজাউদ্দিন খেয়াঘাট- রোডপাড়া বাজার সড়কে ৪০০ মিটার সুজাউদ্দিন খেয়াঘাট ব্রিজ নির্মাণ (রোড আইডিঃ ৫০৪২৮৪০৩৩) UHBP barguna-s 504284033 72.00 0 707.60 M/S. Abul Kalam Azad 558.92 06/04/2021 14/04/2021 30/06/2024 80 370.06 0 28/09/2024  
423 CBU-100/ Purto-236 বরগুনা জেলার বেতাগি উপজেলাধীন ভরা - সরিষামরি সড়কে ৫০ মিটার চেইনেজে ব্রিজ নির্মাণ (রোড আইডিঃ ৫০৪৪৭৪০১৪) UHBP betagi 504474014 42.00 0 314.83 M/S. Abul Kalam Azad. Muslimpara, Sadar, Patuakhali. 245.55 25/11/2021 02/12/2021 30/06/2024 40 0.00 0 28/09/2024  
424 CBU-100/ Purto-237 বরগুনা জেলার বেতাগি উপজেলাধীন ব্রিজের হাট সেতুর হাট পুলিশফাড়ি-পশ্চিম রানীপুর সরকারী প্রাথমিক বিদ্যালয় সড়কে ব্রিজ নির্মাণ (রোড আইডিঃ ৫০৪৪৭৪২৩৩) UHBP betagi 504474233 42.00 0 567.20 M/S. Islam Brothers Ltd 439.41 13/04/2021 20/04/2021 30/05/2024 90 362.56 0 28/09/2024  
425 CBU-100/ Purto-425 বরগুনা জেলার পাথরঘাটা উপজেলাধীন জামিরতলা-রতন মেম্বারের বাড়ী-ইস্কান্দার ফকির বাড়ী সড়কে ১৩৪০মিটার চেইনেজে (রোড আইডি-৫০৪৮৫৪০৬৫) সেতু নির্মাণ। UHBP patharghata 504854065 31.00 0 385.39 M/S. Mohiuddin Ahmed 346.85 18/06/2023 01/08/2023 30/11/2024 60 197.38 0 28/09/2024  
426 UIIP-BC/PCO/W-537 A) Construction of One no. Shed for Public Transport Passenger (28.00sqm) at Lanch Ghat at Ward No.07, Under Betagi Pourashava, Dist: Barguna. B) Construction of One Storied Public Toilet (Type A=56.00sqm) at Lanch Ghat at ward No.-07 Under Betagi Pourashava, Dist: Barguna. UIIP betagi 100 47.33 M/S Al-Amin Enterprise 47.23 19/09/2022 19/09/2022 18/09/2023 100 47.10 100 07/10/2024
427 UIIP-BC/PCO/W-548 A) Construction of RCC Road from Mridha Bari to Khalpar (Ch.0.00-260.00m) at Ward no-04 Under Betagi Pourashava, Barguna. (Salvage Amount-74,988.00)B) Construction of RCC Road with one no. U-Drain from Habib Councillor Home to Alam Councillor Home (Ch.0.00-188.00m) & both side of box Culvert (Ch.188.00-210.00=22.00m) at ward no.03. Under Betagi Pourashava, Barguna. (Salvage Amount-24,773.00) UIIP betagi 0.47 100 77.34 M/S Al-Amin Enterprise 77.18 26/07/2023 26/07/2023 25/07/2024 100 77.13 100 07/10/2024
428 UIIP-BC/PCO/W-549 A) Construction of RCC Road with 04 nos U-drain from Khalil Contractor Home to Masud Prof. Home via Moti Khan Home (Ch:0.00-316.00m) at ward no.08 under Betagi Pourashava, Barguna. (Salvage Amount-10,603.00) B) Construction of RCC Road from Madrasha BC road to Nasir Uddin Pijus Home Ch:0.00-175.00m at ward no.08 Under Betagi Pourashava, Barguna. (Salvage Amount-12,701.00) UIIP betagi 0.49 77 84.11 M/S Anfa Enterprise 83.89 26/07/2023 26/07/2023 25/07/2024 100 64.65 77 07/10/2024
429 UIIP-BC/PCO/W-550 A) Construction of RCC Road from Madrasha BC road to Al-Amin Mollik Home Ch.0.00m-100.00m and in front of Jalil Mollik Home Ch:0.00-70.00m at ward no.08 Under Betagi Pourashava, Barguna. (Salvage Amount-16,743.00) B) Construction of RCC Road from RHD road to Dhali Khanda road via Panna Home Ch.0.00-371.00m at ward no.03 under Betagi Pourashava, Barguna. (Salvage Amount-31,176.00) C) Construction of RCC Road from Wapda raod to Nondi Bari Ch.0.00-134.00m at Ward No.-06 Under Betagi Pourashava, Barguna. (Salvage Amount-9237.00) UIIP betagi 0.68 86 94.71 M/S Subama Enterprise 94.38 26/07/2023 26/07/2023 25/07/2024 100 80.82 86 07/10/2024
430 UIIP-BC/PCO/W-305 Construction of one Storied Vegetable & Agricultural Products Market on 3-Storied Foundation (Floor Area= 270.00 sqm) under Betagi Pourashava, Barguna. UIIP betagi 41 149.90 M/S Shikder Construction 149.75 20/09/2023 20/09/2023 19/09/2024 75 60.69 41 07/10/2024
431 UIIP/PCO/G-33 Implementation & Supply 439 nos Waste Basket (120 ltr) & 30 nos Non-motorized vehicle (van) under Betagi Pourashava District: Barguna. UIIP betagi 39.98 RFL Plastrics Limited 26.60 50 07/10/2024
432 UIIP-BC/PCO/W-39 Construction of RCC road from Daser Bridge to RCC road via Akon Bari & Wazed commander home at ward no.02 & 03.Ch. 00.00m-1073.00m. UIIP betagi   1.07 0.00 100 93.06 M/S Khan Enterprise 92.96 09/08/2020 16/08/2020 15/08/2020 100 92.96 100 29/09/2022 0.10% Less
433 UIIP-BC/PCO/W-41 Construction of RCC road form Basonda Govt. Primary School to Carpating Road Via Dali kandha Pul Ch 00-1132 at Ward no3. UIIP betagi   1.13 0.00 100 98.17 M/S Khan Enterprise 98.13 09/08/2020 16/08/2020 15/08/2020 100 98.13 100 29/09/2022 0.05% Less
434 UIIP-BC/PCO/W-42 A Construction of RCC road form Mahamudar gola to Hafizia Madrasha Ch 00.00-620.0 m at Ward no1 B Construction of RCC road with side Guide Wall Ch. 00.00-35.00m form Rafil Haji bari to Montu commissioner bari via Juwel and Sabina Yeasmin Doly Home Ch. 00.00-275.00m and Biswas bari to Habib commissioner home Ch 00.00-200.0m Total 475.00m at Ward no 03. UIIP betagi   1.10 0.00 100 96.83 M/S Shikder Enterprise 96.77 09/08/2020 16/08/2020 15/08/2020 100 96.77 100 29/09/2022 0.07% Less
435 UIIP-BC/PCO/W-199 i. Construction of RCC road form Mahasarak to Baro Khal via Mridha Bari Ch 00.00-250.00m at Ward no:4, ii. Construction of RCC road form Food Godown with palasiding (Ch. 90.00-250.00m ) to Mahamudar Gola Via Khal Par 00.00-300.00m at Ward no:1. Under Betagi Pourashava, iii. Construction of RCC road form Hijoltala Primary School to Joynal Fakir home Ch 00.00-100.00m at Ward no:3 Under Betagi Pourashava, Barguna and iv. Construction of RCC road with side Guide Wall form Upazila Quqrter to WAPDA road via Muslim Koloni Ch 00.00-192.00 m at Ward no: 08 Under Betagi Pourashava, Barguna UIIP betagi   0.84 0.00 99 85.29 M/S Hakkanur Enterprise 85.10 25/10/2020 01/11/2020 24/10/2021 100 85.10 99 29/09/2022 0.22% Less
436 UIIP-BC/PCO/W-200 A Construction of RCC Drain from Captain Selim home to Jelepara Mondir via Govt College to Manik Khan home Ch. 00.00-410.00mat ward No. 05. Under Betagi Pourashava Barguna and ii. Construction of RCC Drain in front of Babul Mia home and kacha bazar to Madrasha Ch 00.00-190.00 m at Ward no 08. Under Betagi Pourashava Barguna B Construction of RCC road from College Pond to Humayun Professor via College Mosque 220.00m Betagi-Patuakhali road to Sayed Jakir home 60.00m College road to Harun Fakir home 75.00m at ward no.05 & 1 No. Ward Carpeting road to Tota Member home 200.00m at ward no. 01 Under Betagi Pourashava Barguna. UIIP betagi   1.15 0.00 100 122.33 M/S Shikder Enterprise 122.09 22/10/2020 28/10/2021 100 122.07 100 29/09/2022 0.19% Less
437 UIIP-BC/PCO/W-201 A Construction of RCC road form Betagi Niamoti Highway Road to Dafi Howlader Bari via Purbo Betagi Primary School Ch 00.00-518.40 m at Ward no2. Under Betagi Pourashava. B Construction of RCC road form by pass road to Upazila chairman bari Ch 00.00-180.0 m at Ward no9 Under Betagi Pourashava C Construction of RCC work for Khas Kachari Math of Agriculture & Product Market Length-32.00m B-15.00m at ward No. 07 Under Betagi Pourashava. UIIP betagi   0.73 0.00 100 81.24 M/S Khan Enterprise 81.06 22/10/2020 28/10/2021 100 81.02 100 29/09/2022 0.22% Less
438 UIIP-BC/PCO/W-40 A. Construction of RCC road with road side Guide Wall form Baily Bridge to By pass Road Via Goni Howlader Bari Ch 00-627 at Ward no 9 B. Construction of RCC road with side Guide Wall Ch. 302.00-332.00m form Baro khaler par to WAPDA road via Mazibar Howlader bari Ch 00.00-332.0 m at Ward no8. UIIP betagi   0.99 0.00 100 86.34 M/S Khan Enterprise 86.25 09/08/2020 16/08/2020 15/08/2020 100 86.25 100 29/09/2022 0.10% Less
439 UIIP-BC/PCO/W-404 A) Construction of RCC Road with Guide wall from Upazila Parished Gate to South Side Upazila Parished Complex (Ch:0.00-124.00m) all side of Upazila Parished Pond (Ch:0.00-360.00m) Upazila Parished to KG School Via DPHE Office (Ch:0.00-260.00m) at ward No.07 (B) Salamer Barir Culvert to Betagi-Niamoti road (Ch:0.00-176.00m) at ward No.03 under Betagi Pourashava District : Barguna Total Length=920m. UIIP betagi   0.92 0.00 0 129.48 M/S Shikder Enterprise 129.31 17/05/2022 16/05/2023 32 0.00 0 29/09/2022 0.131% less
440 UIIP-BC/PCO/W-405 A) Construction of 01 No. 1-Vent Culvert size (3.00X3.00)m of Bapari Bari fornt site word no. 03 Under Betagi Pourashava District: Barguna. B) Construction of 01 No. 1-Vent Culvert size (3.00X3.00)m of Samsul Islam Doctor Bari fornt site word no. 09 Under Betagi Pourashava District: Barguna. C) Construction of 01 No. 1-Vent Culvert size (2.00X2.00)m of Sharif Bari fornt site word no. 02 Under Betagi Pourashava District: Barguna. D) Construction of 01 No.1-Vent Culvert size (2.00X2.00)m of Prashanda's Danga word no 03 Under Betagi Pourashava District: Barguna. E) Construction of 01 No. 1-Vent Culvert size (3.00x3.00)m of Habib Comisonar House Khal fornt site word no. 03 Under Betagi Pourashava District: Barguan. F) Construction of 01 No. 1-Vent size (2.00x2.00)m of Dilip House fornt site word no. 02 Under Betagi Pourashava District: Barguna. UIIP betagi   14.00 100 79.07 M/S Hakkanur Entr. 79.00 11/09/2021 11/08/2022 100 79.00 100 29/09/2022 0.08% Less
441 UIIP-BC/PCO/W-406 A) Construction of RCC Drain from (i) Natun Dack Bangla to Khal (Ch:0.00-125.00m) ward no. 06 (ii) Old Drain to Govt Collage (Ch:0.00-150.00m) ward no 05 (iii) Montu Khan’s House to Khal par (Ch:0.00-150.00m) word no 06 Under Betagi Pourashava District: Barguna. B) Construction of RCC Drain from (i) RCC Road to boro Khal via Paltu Comisoner Home (Ch 0.00-40.00m) word no 07 (ii) RCC Road to boro Khal via Babul Kazi Home Ch. 0.00-36.00mm word no 07 (iii) Sankor Home to Hospital Gate (Ch. 0.00-170.00m) word no 07 (iv) Nazmul Huda home to boro Khal (Ch. 0.00-250.00m) word no 05 (v) Sabdar Chand Munsir Mazar to Faysal Home (Ch.0.00-168.00m) word no 08 (vi) RCC Road to baro Khal via Manik Roy Home (Ch. 0.00-250.00m) word no. 07 Under Betagi Pourashava District: Barguna. UIIP betagi   0.00 100 171.70 M/S Khan Entr. 171.69 09/11/2021 08/11/2022 100 171.69 100 29/09/2022 As Per
442 UTMIDP- BAMN/ BARG/ WR-29 1. Improvement of RCC road from Hospital BC road at Ali house to Hamayet Molla house via ponu Member house from Ch. 0.00m-900.00m under Bamna Upazila, District: Barguna. (Road ID:504194131) 2. Improvement of RCC road from Bamna Khaopatua BC to Baitul Karim Mosque BC road at Ch. 0.00m- 600.00m under Bamna Upazila, District: Barguna. (Road ID:504194057) UTMIDP bamna 1.50 124.86 M/S Ebad Construction & Tahidul Basher Kabir (JV), Mathbaria, Pirojpur 101.35 29/07/2019 30/06/2020 40 08/12/2019 Work ongoing
443 UTMIDP-BAMN/ BARG/ WD-10 Comstruction of RCC Drain at Bamna Bazar (Total Length 705.00m) under Bamna Upzila, District: Barguna. UTMIDP bamna 504193001 0.71 106.81 M/S Poly Construction, College Road, Barguna 90.94 29/07/2019 07/06/2020 20 08/12/2019 Work ongoing