1
|
B.baria
|
14
|
bancharampur
|
103
|
253
|
PWA-UZC- Bancharampur-74
|
Construction of Upazila Complex Extention Building & Hall Room
|
|
|
|
2.00
|
344.09
|
M/S Tushi & Hazi ALi AKbar(JV)
|
354.24
|
|
14/03/2012
|
13/03/2013
|
100
|
|
100
|
03/07/2019
|
|
2
|
B.baria
|
14
|
kasba
|
105
|
253
|
PWA-UZC- Kashba-75
|
Construction of Upazila Complex Extention Building & Hall Room
|
|
|
|
|
445.00
|
M/S Business Syndicate International
|
405.29
|
|
12/11/2014
|
31/10/2018
|
100
|
|
|
20/12/2021
|
|
3
|
B.baria
|
14
|
nabinagar
|
106
|
253
|
PWA-UZC- Nabinagar-76
|
Construction of Upazila Complex Extention Building & Hall Room
|
|
|
|
2.00
|
344.09
|
M/S Smriti Enterprise
|
378.08
|
|
27/03/2012
|
26/03/2013
|
100
|
|
100
|
03/07/2019
|
|
4
|
B.baria
|
14
|
nasirnagar
|
83
|
253
|
PWA-UZC- Nasirnagar-77
|
Construction of Upazila Complex Extention Building & Hall Room
|
|
|
|
|
479.68
|
MBC & MZH (JV)
|
378.99
|
|
13/04/2016
|
12/07/2017
|
75
|
|
|
19/12/2018
|
|
5
|
Bagerhat
|
44
|
fakirhat
|
319
|
253
|
PWA-UZC- Fakirhat-156
|
Construction of Upazila Complex Extention Building & Hall Room
|
|
|
|
|
476.23
|
M/S Hemel Enterprise
|
375.49
|
|
|
|
35
|
|
|
19/12/2018
|
|
6
|
Bagerhat
|
44
|
kachua
|
318
|
253
|
PWA-UZC- Kachua-158
|
Construction of Upazila Complex Extention Building & Hall Room
|
|
|
|
|
682.16
|
Dhaly Construction Ltd
|
589.90
|
|
01/06/2016
|
01/09/2017
|
85
|
|
|
19/12/2018
|
|
7
|
Bagerhat
|
44
|
morrelganj
|
321
|
253
|
PWA-UZC- Morolgonj-157
|
Construction of Upazila Complex Extention Building & Hall Room
|
|
|
|
2.00
|
882.46
|
M/S S.S. Brothers
|
1075.80
|
03/11/2019
|
18/11/2019
|
31/12/2021
|
80
|
811.39
|
75
|
20/12/2021
|
|
8
|
Bagerhat
|
44
|
rampal
|
316
|
253
|
PWA-UZC- Rampal-155
|
Construction of Upazila Complex Extention Building & Hall Room
|
|
|
|
|
552.00
|
M/S SN Builders
|
496.08
|
|
25/06/2012
|
24/06/2013
|
100
|
|
|
19/12/2018
|
|
9
|
Bandarban
|
15
|
ruma
|
127
|
253
|
PWA-UZC- Ruma-65
|
Construction of Upazila Complex Extention Building & Hall Room
|
|
|
|
|
496.43
|
Mohammad Eunus & Brothers Pvt. Ltd.
|
511.82
|
|
25/01/2016
|
11/05/2017
|
65
|
|
|
19/12/2018
|
|
10
|
Bandarban
|
15
|
thanchi
|
119
|
253
|
PWA-UZC-OW-10
|
Construction of Internal Road
|
|
|
|
|
21.63
|
M/S Zawad Enterprise
|
20.55
|
|
|
|
0
|
|
|
19/12/2018
|
|
11
|
Bandarban
|
15
|
thanchi
|
119
|
253
|
PWA-UZC- Thanchi-234
|
Construction of Dormitory
|
|
|
|
|
210.66
|
Mr. U.T.Mong
|
189.60
|
|
28/09/2017
|
28/10/2018
|
35
|
|
|
19/12/2018
|
|
12
|
Bandarban
|
15
|
thanchi
|
119
|
253
|
PWA-UZC- Thanchi-232
|
Construction of UNO Qrtr.
|
|
|
|
|
105.47
|
Mr. U.T.Mong
|
92.21
|
|
15/02/2017
|
14/02/2018
|
93
|
|
|
19/12/2018
|
|
13
|
Bandarban
|
15
|
thanchi
|
119
|
253
|
PWA-UZC- Thanchi-64
|
Construction of Upazila Complex Extention Building & Hall Room
|
|
|
|
|
712.64
|
M/S Zawad Enterprise
|
925.90
|
|
23/10/2014
|
23/10/2015
|
100
|
|
|
19/12/2018
|
|
14
|
Barguna
|
2
|
bamna
|
17
|
253
|
PWA-UZC- Bamna-194
|
Construction of Upazila Complex Extention Building & Hall Room
|
|
|
|
|
490.44
|
M/S Alam Construction & F.H. enterprise (JV)
|
592.88
|
|
04/02/2013
|
04/02/2014
|
100
|
|
|
19/12/2018
|
|
15
|
Barguna
|
2
|
barguna-s
|
18
|
253
|
PWA-UZC- Barguna-S-195
|
Construction of Upazila Complex Extention Building & Hall Room
|
|
|
|
|
624.59
|
M/S Poly Construction
|
647.74
|
|
|
|
0
|
|
|
19/12/2018
|
|
16
|
Barguna
|
2
|
betagi
|
2
|
253
|
PWA-UZC- Betagi-193
|
Construction of Upazila Complex Extention Building & Hall Room
|
|
|
|
|
679.45
|
M/S Khandaker Shahin Ahmed
|
611.51
|
|
23/08/2017
|
22/08/2018
|
40
|
|
|
19/12/2018
|
|
17
|
Barguna
|
2
|
patharghata
|
40
|
253
|
PWA-UZC- Patharghata-192
|
Construction of Upazila Complex Extention Building & Hall Room
|
|
|
|
|
832.49
|
M/S Islam Brothers
|
749.24
|
|
15/10/2017
|
14/10/2018
|
35
|
|
|
19/12/2018
|
|
18
|
Barishal
|
5
|
agailjhara
|
21
|
253
|
PWA-UZC- Agailjhara-240
|
Construction of Dormitory
|
|
|
|
|
0.00
|
|
0.00
|
|
|
|
0
|
|
|
19/12/2018
|
|
19
|
Barishal
|
5
|
agailjhara
|
21
|
253
|
PWA-UZC- Agailjhara-238
|
Construction of UNO Qrtr
|
|
|
|
|
132.91
|
M/S Mother Engineering
|
136.91
|
|
17/07/2018
|
30/06/2019
|
30
|
|
|
19/12/2018
|
|
20
|
Barishal
|
5
|
agailjhara
|
21
|
253
|
PWA-UZC- Agailjhara-239
|
Construction of Twin Qrtr
|
|
|
|
|
0.00
|
|
0.00
|
|
|
|
0
|
|
|
19/12/2018
|
|
21
|
Barishal
|
5
|
agailjhara
|
21
|
253
|
PWA-UZC- Agailjhara-230
|
Construction of Upazila Complex Extention Building & Hall Room
|
|
|
|
|
548.81
|
MME-AEC (JV)
|
602.00
|
|
13/06/2017
|
28/06/2018
|
80
|
|
|
19/12/2018
|
|
22
|
Barishal
|
5
|
babuganj
|
26
|
253
|
PWA-UZC- Babugonj-182
|
Construction of Upazila Complex Extention Building & Hall Room
|
|
|
|
|
535.98
|
M/S Podder Enterprise
|
423.86
|
|
25/02/2016
|
16/07/2017
|
95
|
|
|
19/12/2018
|
|
23
|
Barishal
|
5
|
banaripara
|
20
|
253
|
PWA-UZC- Banaripara-183
|
Construction of Upazila Complex Extention Building & Hall Room
|
|
|
|
|
534.98
|
M/S Kohinoor Enterprise
|
586.60
|
|
20/04/2015
|
18/07/2016
|
100
|
|
|
19/12/2018
|
|
24
|
Barishal
|
5
|
gouranadi
|
22
|
253
|
PWA-UZC- Gaurnadi-181
|
Construction of Upazila Complex Extention Building & Hall Room
|
|
|
|
|
530.82
|
M/S Santu Traders
|
583.78
|
|
07/07/2015
|
30/09/2016
|
100
|
|
|
19/12/2018
|
|
25
|
Barishal
|
5
|
uzirpur
|
29
|
253
|
PWA-UZC- Ujirpur-180
|
Construction of Upazila Complex Extention Building & Hall Room
|
|
|
|
|
535.20
|
M/S Poly Engineering
|
561.31
|
|
|
|
100
|
|
|
19/12/2018
|
|
26
|
Bhola
|
4
|
bhola-s
|
4
|
253
|
PWA-UZC- Bhola-S-216
|
Construction of Upazila Complex Extention Building & Hall Room
|
|
|
|
|
558.44
|
M/S Elli Enterprise
|
458.39
|
|
|
|
100
|
|
|
19/12/2018
|
|
27
|
Bhola
|
4
|
charfassion
|
5
|
253
|
PWA-UZC- Charfasion-196
|
Construction of Upazila Complex Extention Building & Hall Room
|
|
|
|
|
529.54
|
Md. Abdul Khaleque
|
631.89
|
|
06/11/2013
|
05/11/2014
|
100
|
|
|
19/12/2018
|
|
28
|
Bhola
|
4
|
daulatkhan
|
30
|
253
|
PWA-UZC- OW-05
|
Construction of Internal Road
|
|
|
|
|
17.92
|
Mohammad Eunus & Brothers Pvt. Ltd.
|
17.91
|
|
|
|
100
|
|
|
19/12/2018
|
|
29
|
Bhola
|
4
|
daulatkhan
|
30
|
253
|
PWA-UZC- Daulatkhan-198
|
Construction of Upazila Complex Extention Building & Hall Room
|
|
|
|
|
591.54
|
Mohammad Eunus & Brothers Pvt. Ltd.
|
621.12
|
|
|
|
100
|
|
|
19/12/2018
|
|
30
|
Bhola
|
4
|
lalmohan
|
6
|
253
|
PWA-UZC- Lalmohon-197
|
Construction of Upazila Complex Extention Building & Hall Room
|
|
|
|
|
518.09
|
Md. Rasheduzzaman
|
687.92
|
|
13/01/2013
|
13/01/2014
|
100
|
|
|
19/12/2018
|
|
31
|
Bogura
|
51
|
dhupchancia
|
350
|
253
|
PWA-UZC- Dhupchancia-27
|
Construction of Upazila Complex Extention Building & Hall Room
|
|
|
|
|
378.84
|
M/S Das Traders
|
359.30
|
|
03/06/2018
|
03/09/2019
|
5
|
|
|
19/12/2018
|
|
32
|
Bogura
|
51
|
kahaloo
|
352
|
253
|
PWA-UZC- Kahaloo-220
|
Construction of Upazila Complex Extention Building & Hall Room
|
|
|
|
|
470.34
|
MIM & Mondol (JV)
|
383.65
|
|
18/09/2018
|
22/06/2019
|
75
|
|
|
19/12/2018
|
|
33
|
Bogura
|
51
|
nandigram
|
353
|
253
|
PWA-UZC- Nandigram-30
|
Construction of Upazila Complex Extention Building & Hall Room
|
|
|
|
|
430.47
|
M/S Kabir Traders
|
428.84
|
|
16/04/2014
|
15/04/2015
|
100
|
|
|
19/12/2018
|
|
34
|
Bogura
|
51
|
sonatala
|
357
|
253
|
PWA-UZC- Sonatala-26
|
Construction of Upazila Complex Extention Building & Hall Room
|
|
|
|
|
483.40
|
RTSC (JV)
|
406.82
|
|
15/02/2017
|
14/05/2018
|
100
|
|
|
19/12/2018
|
|
35
|
C. nawabganj
|
47
|
nachol
|
339
|
253
|
PWA-UZC- Nachol-41
|
Construction of Upazila Complex Extention Building & Hall Room
|
|
|
|
|
473.36
|
Md. Moyen Khan & HE (JV)
|
368.11
|
|
08/03/2017
|
10/01/2018
|
90
|
|
|
19/12/2018
|
|
36
|
C. nawabganj
|
47
|
nawabganj-s
|
340
|
253
|
PWA-UZC- Nawabganj-S-520
|
Construction of Upazila Complex Extention Building & Hall Room
|
|
|
|
|
456.91
|
Uday-Fair (JV)
|
349.61
|
|
16/10/2016
|
15/01/2018
|
100
|
|
|
19/12/2018
|
|
37
|
C. nawabganj
|
47
|
shibganj
|
341
|
253
|
PWA-UZC- Shibganj-40
|
Construction of Upazila Complex Extention Building & Hall Room
|
|
|
|
|
434.81
|
MIM & Selim (JV)
|
393.01
|
|
15/10/2014
|
07/01/2016
|
100
|
|
|
19/12/2018
|
|
38
|
Chandpur
|
12
|
chandpur-s
|
77
|
253
|
PWA-UZC- Chandpur-S-73
|
Construction of Upazila Complex Extention Building & Hall Room
|
|
|
|
|
362.37
|
M/S Niaz traders
|
389.25
|
|
18/06/2012
|
17/06/2013
|
100
|
|
|
19/12/2018
|
|
39
|
Chandpur
|
12
|
faridganj
|
78
|
253
|
PWA-UZC- Faridgonj-71
|
Construction of Upazila Complex Extention Building & Hall Room
|
|
|
|
|
461.39
|
Appollo Engineering & Consortium
|
405.90
|
|
01/07/2016
|
24/09/2017
|
75
|
|
|
19/12/2018
|
|
40
|
Chandpur
|
12
|
kachua
|
90
|
253
|
PWA-UZC- Kachua-293
|
Construction of Twin Qrtr.
|
|
|
|
|
0.00
|
|
0.00
|
|
|
|
0
|
|
|
19/12/2018
|
|
41
|
Chandpur
|
12
|
kachua
|
90
|
253
|
PWA-UZC- Kachua-292
|
Construction of Upazila Complex Extention Building & Hall Room
|
|
|
|
|
614.01
|
MAZ-MMK (JV)
|
552.61
|
|
23/07/2017
|
15/07/2018
|
40
|
|
|
19/12/2018
|
|
42
|
Chandpur
|
12
|
shahrasti
|
74
|
253
|
PWA-UZC- Shahrajtri-72
|
Construction of Upazila Complex Extention Building & Hall Room
|
|
|
|
|
484.42
|
MRE-MRTA (JV)
|
455.03
|
|
01/03/2018
|
28/02/2019
|
5
|
|
|
19/12/2018
|
|
43
|
Chattogram
|
11
|
anwara
|
73
|
253
|
PWA-UZC- Anwara-53
|
Construction of Upazila Complex Extention Building & Hall Room
|
|
|
|
|
643.87
|
Consonance & Abul Bashar (JV)
|
579.48
|
|
|
|
0
|
|
|
19/12/2018
|
|
44
|
Chattogram
|
11
|
banskhali
|
62
|
253
|
PWA-UZC- Banshkhali-214
|
Construction of Upazila Complex Extention Building & Hall Room
|
|
|
|
|
618.05
|
Mohammad Eunus & Brothers Pvt. Ltd.
|
570.66
|
|
09/02/2015
|
19/07/2016
|
80
|
|
|
19/12/2018
|
|
45
|
Chattogram
|
11
|
mirsharai
|
68
|
253
|
PWA-UZC- Mirsarai-52
|
Construction of Upazila Complex Extention Building & Hall Room
|
|
|
|
|
474.84
|
Delta Engineering & Consortium
|
521.87
|
|
|
|
100
|
|
|
19/12/2018
|
|
46
|
Chattogram
|
11
|
rangunia
|
67
|
253
|
PWA-UZC- Rangunia-54
|
Construction of Upazila Complex Extention Building & Hall Room
|
|
|
|
|
351.22
|
Consonance Engineers & Builders
|
391.27
|
|
27/06/2012
|
26/06/2013
|
100
|
|
|
19/12/2018
|
|
47
|
Chattogram
|
11
|
raojan
|
66
|
253
|
PWA-UZC- OW-01
|
Construction of Retaining Wall
|
|
|
|
|
20.51
|
M/S Iqbal & Brothers
|
20.50
|
|
|
|
100
|
|
|
19/12/2018
|
|
48
|
Chattogram
|
11
|
raojan
|
66
|
253
|
PWA-UZC- Raujan-50
|
Construction of Upazila Complex Extention Building & Hall Room
|
|
|
|
|
404.22
|
M/S Choudhury Enterprise-Kashem Construction (JV)
|
444.90
|
|
13/06/2013
|
12/06/2014
|
100
|
|
|
19/12/2018
|
|
49
|
Chattogram
|
11
|
satkania
|
58
|
253
|
PWA-UZC- Satkania-49
|
Construction of Upazila Complex Extention Building & Hall Room
|
|
|
|
|
519.75
|
M/S Friends International
|
468.13
|
|
21/11/2017
|
21/02/2019
|
0
|
|
|
19/12/2018
|
|
50
|
Chattogram
|
11
|
sitakunda
|
64
|
253
|
PWA-UZC- Shitakunda-51
|
Construction of Upazila Complex Extention Building & Hall Room
|
|
|
|
|
548.88
|
Mohammad Eunus & Brothers Pvt. Ltd.
|
449.35
|
|
23/02/2016
|
23/05/2017
|
100
|
|
|
19/12/2018
|
|
51
|
Chuadanga
|
42
|
alamdanga
|
311
|
253
|
PWA-UZC- Alamdanga-178
|
Construction of Upazila Complex Extention Building & Hall Room
|
|
|
|
|
0.00
|
|
0.00
|
|
|
|
0
|
|
|
19/12/2018
|
|
52
|
Chuadanga
|
42
|
jibannagar
|
295
|
253
|
PWA-UZC- Jibannagar-179
|
Construction of Upazila Complex Extention Building & Hall Room
|
|
|
|
|
438.42
|
Jahirul Limited
|
394.58
|
|
15/05/2017
|
06/08/2018
|
85
|
|
|
19/12/2018
|
|
53
|
Cox's bazar
|
13
|
chakoria
|
123
|
253
|
PWA-UZC- Chakoria-527
|
Construction of Upazila Complex Extention Building & Hall Room
|
|
|
|
|
623.86
|
M/S Noor Syndicate
|
639.91
|
|
12/07/2018
|
12/11/2019
|
10
|
|
|
19/12/2018
|
|
54
|
Cox's bazar
|
13
|
cox's bazar-s
|
100
|
253
|
PWA-UZC- Cox'sbazar-S-58
|
Construction of Upazila Complex Extention Building & Hall Room
|
|
|
|
|
466.05
|
Delta Engineers & Consortium Ltd.
|
442.53
|
|
15/03/2015
|
14/06/2016
|
100
|
|
|
19/12/2018
|
|
55
|
Cox's bazar
|
13
|
moheskhali
|
126
|
253
|
PWA-UZC- Maheshkhali-57
|
Construction of Upazila Complex Extention Building & Hall Room
|
|
|
|
|
650.03
|
Delta Engineering & Hasan Enterprise
|
649.72
|
|
30/05/2018
|
30/08/2019
|
0
|
|
|
19/12/2018
|
|
56
|
Cox's bazar
|
13
|
ramu
|
129
|
253
|
PWA-UZC- Ramu-56
|
Construction of Upazila Complex Extention Building & Hall Room
|
|
|
|
|
0.00
|
|
0.00
|
|
|
|
0
|
|
|
19/12/2018
|
|
57
|
Cox's bazar
|
13
|
teknaf
|
135
|
253
|
PWA-UZC- Teknaf-55
|
Construction of Upazila Complex Extention Building & Hall Room
|
|
|
|
|
470.65
|
The Engineers & Construction - The Engineers & Builders (JV)
|
437.00
|
|
22/05/2016
|
22/11/2017
|
45
|
|
|
19/12/2018
|
|
58
|
Cumilla
|
10
|
barura
|
72
|
253
|
PWA-UZC- Barura-67
|
Construction of Upazila Complex Extention Building & Hall Room
|
|
|
|
|
344.09
|
M/S MI EnterPrise
|
355.74
|
|
22/02/2012
|
17/04/2014
|
100
|
|
|
19/12/2018
|
|
59
|
Cumilla
|
10
|
burichong
|
93
|
253
|
PWA-UZC- Burichang-68
|
Construction of Upazila Complex Extention Building & Hall Room
|
|
|
|
|
481.18
|
M/S R-ta Enterprise
|
441.30
|
|
28/04/2016
|
29/07/2017
|
100
|
|
|
19/12/2018
|
|
60
|
Cumilla
|
10
|
chouddagram
|
94
|
253
|
PWA-UZC- Chaddagram-66
|
Construction of Upazila Complex Extention Building & Hall Room
|
|
|
|
|
344.09
|
M/S R-ta Enterprise
|
361.22
|
|
29/02/2012
|
28/02/2013
|
100
|
|
|
19/12/2018
|
|
61
|
Cumilla
|
10
|
debidwar
|
54
|
253
|
PWA-UZC- Debidar-70
|
Construction of Upazila Complex Extention Building & Hall Room
|
|
|
|
|
443.46
|
M/S R-ta Enterprise & M/S Sumi Enterprise (JV)
|
487.67
|
|
25/09/2014
|
28/02/2017
|
100
|
|
|
19/12/2018
|
|
62
|
Cumilla
|
10
|
nangalkot
|
97
|
253
|
PWA-UZC- Langalkot-69
|
Construction of Upazila Complex Extention Building & Hall Room
|
|
|
|
|
453.75
|
M/S R-TA Enterprise
|
498.86
|
|
31/08/2013
|
24/08/2014
|
100
|
|
|
19/12/2018
|
|
63
|
Dhaka
|
24
|
keraniganj
|
178
|
253
|
PWA-UZC- Keranigonj-98
|
Construction of Upazila Complex Extention Building & Hall Room
|
|
|
|
|
506.31
|
M/S Noor Construction
|
473.36
|
|
|
|
100
|
|
|
19/12/2018
|
|
64
|
Dhaka
|
24
|
savar
|
176
|
253
|
PWA-UZC- Savar-99
|
Construction of Upazila Complex Extention Building & Hall Room
|
|
|
|
|
346.19
|
M/S Urmi Enterprise
|
360.87
|
|
07/03/2012
|
07/03/2013
|
100
|
|
|
19/12/2018
|
|
65
|
Dinajpur
|
58
|
birol
|
412
|
253
|
PWA-UZC- Birol-06
|
Construction of Upazila Complex Extention Building & Hall Room
|
|
|
|
|
442.10
|
KT-TE (JV)
|
371.83
|
|
08/11/2015
|
08/02/2017
|
100
|
|
|
19/12/2018
|
|
66
|
Dinajpur
|
58
|
dinajpur-s
|
420
|
253
|
PWA-UZC- Dinajpur-S-11
|
Construction of Upazila Complex Extention Building & Hall Room
|
|
|
|
|
439.50
|
M/S Rafiqul Islam
|
401.37
|
|
11/06/2015
|
10/09/2016
|
100
|
|
|
19/12/2018
|
|
67
|
Dinajpur
|
58
|
fulbari
|
415
|
253
|
PWA-UZC- Fulbari-09
|
Construction of Upazila Complex Extention Building & Hall Room
|
|
|
|
|
465.59
|
Dhaly Construction Ltd.
|
479.04
|
|
16/07/2017
|
22/07/2018
|
80
|
|
|
19/12/2018
|
|
68
|
Dinajpur
|
58
|
ghoraghat
|
416
|
253
|
PWA-UZC- Ghoraghat-07
|
Construction of Upazila Complex Extention Building & Hall Room
|
|
|
|
|
443.86
|
Techbay International
|
382.60
|
|
18/04/2016
|
17/07/2017
|
90
|
|
|
19/12/2018
|
|
69
|
Dinajpur
|
58
|
kaharol
|
418
|
253
|
PWA-UZC- Kaharol-08
|
Construction of Upazila Complex Extention Building & Hall Room
|
|
|
|
|
435.31
|
Real & Habibur (JV)
|
357.03
|
|
09/11/2015
|
15/02/2017
|
100
|
|
|
19/12/2018
|
|
70
|
Dinajpur
|
58
|
khanshama
|
419
|
253
|
PWA-UZC- Khansama-10
|
Construction of Upazila Complex Extention Building & Hall Room
|
|
|
|
|
323.88
|
Md. Nazir Hossain
|
343.61
|
|
17/09/2012
|
16/09/2013
|
100
|
|
|
19/12/2018
|
|
71
|
Faridpur
|
31
|
alfadanga
|
254
|
253
|
PWA-UZC- Alfadanga-140
|
Construction of Upazila Complex Extention Building & Hall Room
|
|
|
|
|
470.59
|
Mr. Atiar Rahman
|
420.46
|
|
28/10/2014
|
20/01/2016
|
100
|
|
|
19/12/2018
|
|
72
|
Faridpur
|
31
|
boalmari
|
256
|
253
|
PWA-UZC- Boalmari-228
|
Construction of Upazila Complex Extention Building & Hall Room
|
|
|
|
|
464.49
|
M/S Rafia Construction
|
706.22
|
|
11/04/2018
|
17/07/2019
|
35
|
|
|
19/12/2018
|
|
73
|
Faridpur
|
31
|
faridpur-s
|
258
|
253
|
PWA-UZC- OW-03
|
Construction of Pre-Cast Pile
|
|
|
|
|
149.96
|
M/S Rafia Construction
|
149.85
|
|
28/12/2016
|
27/03/2017
|
100
|
|
|
19/12/2018
|
|
74
|
Faridpur
|
31
|
faridpur-s
|
258
|
253
|
PWA-UZC- Faridpur-S-141
|
Construction of Upazila Complex Extention Building & Hall Room
|
|
|
|
|
499.90
|
M/S Rafia Construction
|
524.74
|
|
21/08/2016
|
20/11/2017
|
95
|
|
|
19/12/2018
|
|
75
|
Faridpur
|
31
|
madhukhali
|
262
|
253
|
PWA-UZC- Modhukhali-295
|
Construction of Dormitory
|
|
|
|
|
0.00
|
|
0.00
|
|
|
|
0
|
|
|
19/12/2018
|
|
76
|
Faridpur
|
31
|
madhukhali
|
262
|
253
|
PWA-UZC- Modhukhali-294
|
Construction of Twin Qrtr.
|
|
|
|
|
0.00
|
|
0.00
|
|
|
|
0
|
|
|
19/12/2018
|
|
77
|
Faridpur
|
31
|
madhukhali
|
262
|
253
|
PWA-UZC- Modhukhali-227
|
Construction of Upazila Complex Extention Building & Hall Room
|
|
|
|
|
468.77
|
M/S Rafia Construction
|
491.85
|
|
30/10/2017
|
29/10/2018
|
0
|
|
|
19/12/2018
|
|
78
|
Faridpur
|
31
|
nagarkanda
|
253
|
253
|
PWA-UZC- Nagarkanda-139
|
Construction of Upazila Complex Extention Building & Hall Room
|
|
|
|
|
351.52
|
M/S Khondokar Shaheen Ahmed
|
386.50
|
|
07/03/2012
|
06/03/2013
|
100
|
|
|
19/12/2018
|
|
79
|
Feni
|
8
|
chhagalniya
|
43
|
253
|
PWA-UZC- sagalnaia-82
|
Construction of Upazila Complex Extention Building & Hall Room
|
|
|
|
|
448.80
|
TBEAL-RU (JV)
|
488.93
|
|
02/03/2016
|
01/06/2017
|
100
|
|
|
19/12/2018
|
|
80
|
Feni
|
8
|
feni-s
|
63
|
253
|
PWA-UZC- Feni-S-83
|
Construction of Upazila Complex Extention Building & Hall Room
|
|
|
|
|
458.39
|
The Builders Engineers Associates Ltd.
|
490.41
|
|
20/01/2015
|
19/01/2016
|
100
|
|
|
19/12/2018
|
|
81
|
Gaibandha
|
60
|
gobindaganj
|
441
|
253
|
PWA-UZC- Gobindaganj-24
|
Construction of Upazila Complex Extention Building & Hall Room
|
|
|
|
|
431.36
|
M/S Masuma Begum
|
407.25
|
|
|
|
100
|
|
|
19/12/2018
|
|
82
|
Gaibandha
|
60
|
saghata
|
428
|
253
|
PWA-UZC- Saghata-525
|
Construction of Upazila Complex Extention Building & Hall Room
|
|
|
|
|
449.98
|
Dhaly Construction Ltd.
|
404.98
|
|
05/07/2017
|
27/06/2018
|
80
|
|
|
19/12/2018
|
|
83
|
Gaibandha
|
60
|
sundarganj
|
439
|
253
|
PWA-UZC- Sundarganj-25
|
Construction of Upazila Complex Extention Building & Hall Room
|
|
|
|
|
466.88
|
Md. Saidur Rahman
|
398.71
|
|
25/08/2016
|
22/05/2017
|
100
|
|
|
19/12/2018
|
|
84
|
Gazipur
|
21
|
kaliakoir
|
173
|
253
|
PWA-UZC- Kaliakair-100
|
Construction of Upazila Complex Extention Building & Hall Room
|
|
|
|
|
425.14
|
Md. Rofiqul Islam
|
414.60
|
|
20/11/2014
|
20/11/2015
|
100
|
|
|
19/12/2018
|
|
85
|
Gazipur
|
21
|
sreepur
|
159
|
253
|
PWA-UZC- Sreepur-101
|
Construction of Upazila Complex Extention Building & Hall Room
|
|
|
|
|
346.19
|
M/S Apon Enterprise
|
353.25
|
|
18/01/2012
|
17/01/2013
|
100
|
|
|
19/12/2018
|
|
86
|
Gopalganj
|
28
|
kasiani
|
245
|
253
|
PWA-UZC- Kasiani-146
|
Construction of Upazila Complex Extention Building & Hall Room
|
|
|
|
|
475.84
|
M/S Islam Traders & Md. Nayeb Ali Khan (JV)
|
387.10
|
|
28/05/2017
|
27/04/2018
|
60
|
|
|
19/12/2018
|
|
87
|
Gopalganj
|
28
|
kotwalipara
|
230
|
253
|
PWA-UZC- Kotalipara-205
|
Others Construction
|
|
|
|
|
174.40
|
Mazid Sons Construction
|
156.96
|
|
|
|
0
|
|
|
19/12/2018
|
|
88
|
Gopalganj
|
28
|
kotwalipara
|
230
|
253
|
PWA-UZC- Kotalipara-200
|
Land Development
|
|
|
|
|
0.00
|
|
0.00
|
|
|
|
0
|
|
|
19/12/2018
|
|
89
|
Gopalganj
|
28
|
kotwalipara
|
230
|
253
|
PWA-UZC- Kotalipara-203
|
Construction of UNO Qrtr
|
|
|
|
|
82.99
|
M/S Hazi Joynal Abedin & Sons
|
69.95
|
|
|
|
0
|
|
|
19/12/2018
|
|
90
|
Gopalganj
|
28
|
kotwalipara
|
230
|
253
|
PWA-UZC- Kotalipara-202
|
Construction of Chairman Qrtr
|
|
|
|
|
82.99
|
M/S Hazi Joynal Abedin & Sons
|
71.18
|
|
|
|
0
|
|
|
19/12/2018
|
|
91
|
Gopalganj
|
28
|
kotwalipara
|
230
|
253
|
PWA-UZC- Kotalipara-204
|
Construction of Dormitory
|
|
|
|
|
105.21
|
M/S Dulal Chandra Saha
|
99.95
|
|
21/02/2012
|
21/02/2013
|
100
|
|
|
19/12/2018
|
|
92
|
Gopalganj
|
28
|
kotwalipara
|
230
|
253
|
PWA-UZC- Kotalipara-201
|
Construction of Gazzeted Qrtr
|
|
|
|
|
168.09
|
M/S Delowar Hossain Shikder
|
159.79
|
|
21/02/2012
|
21/02/2013
|
100
|
|
|
19/12/2018
|
|
93
|
Gopalganj
|
28
|
kotwalipara
|
230
|
253
|
PWA-UZC- Kotalipara-199
|
Construction of Upazila Complex Extention Building with Hall Room
|
|
|
|
|
815.30
|
GKB & Md. Badrul Iqbal (JV)
|
807.79
|
|
11/03/2012
|
12/06/2013
|
100
|
|
|
19/12/2018
|
|
94
|
Gopalganj
|
28
|
muksudpur
|
220
|
253
|
PWA-UZC- Moksudpur-236
|
Construction of Twin Qrtr
|
|
|
|
|
0.00
|
|
0.00
|
|
|
|
0
|
|
|
19/12/2018
|
|
95
|
Gopalganj
|
28
|
muksudpur
|
220
|
253
|
PWA-UZC- Moksudpur-235
|
Construction of UNO Qrtr
|
|
|
|
|
116.63
|
Starlite Services Limited
|
104.97
|
|
|
|
0
|
|
|
19/12/2018
|
|
96
|
Gopalganj
|
28
|
muksudpur
|
220
|
253
|
PWA-UZC- Moksudpur-237
|
Construction of Dormitory
|
|
|
|
|
0.00
|
|
0.00
|
|
|
|
0
|
|
|
19/12/2018
|
|
97
|
Gopalganj
|
28
|
muksudpur
|
220
|
253
|
PWA-UZC- Moksudpur-145
|
Construction of Upazila Complex Extention Building & Hall Room
|
|
|
|
|
569.78
|
M/S Lalin Traders (JV)
|
468.50
|
|
14/05/2015
|
21/08/2016
|
100
|
|
|
19/12/2018
|
|
98
|
Gopalganj
|
28
|
tungipara
|
232
|
253
|
PWA-UZC- Tungipara-212
|
Others Construction
|
|
|
|
|
0.00
|
|
0.00
|
|
|
|
0
|
|
|
19/12/2018
|
|
99
|
Gopalganj
|
28
|
tungipara
|
232
|
253
|
PWA-UZC- Tungipara-207(b)
|
Land Development
|
|
|
|
|
0.00
|
|
0.00
|
|
|
|
0
|
|
|
19/12/2018
|
|
100
|
Gopalganj
|
28
|
tungipara
|
232
|
253
|
PWA-UZC- Tungipara-210
|
Construction of UNO Qrtr
|
|
|
|
|
134.22
|
Md. Eunus & Brothers Pvt. Ltd.
|
120.79
|
|
25/07/2017
|
24/08/2018
|
60
|
|
|
19/12/2018
|
|
101
|
Gopalganj
|
28
|
tungipara
|
232
|
253
|
PWA-UZC- Tungipara-209
|
Construction of Chairman Qrtr
|
|
|
|
|
152.47
|
Md. Eunus & Brothers Pvt. Ltd.
|
137.22
|
|
25/07/2017
|
24/08/2018
|
60
|
|
|
19/12/2018
|
|
102
|
Gopalganj
|
28
|
tungipara
|
232
|
253
|
PWA-UZC- Tungipara-211
|
Construction of Dormitory
|
|
|
|
|
105.21
|
M/S Rana Construction
|
99.95
|
|
21/02/2012
|
20/02/2013
|
100
|
|
|
19/12/2018
|
|
103
|
Gopalganj
|
28
|
tungipara
|
232
|
253
|
PWA-UZC- Tungipara-208
|
Construction of Gazzeted Qrtr
|
|
|
|
|
175.45
|
M/S Satarupa fabrics
|
166.68
|
|
25/02/2012
|
24/02/2013
|
100
|
|
|
19/12/2018
|
|
104
|
Gopalganj
|
28
|
tungipara
|
232
|
253
|
PWA-UZC- Tungipara-207(a)
|
Construction of Hall Room
|
|
|
|
|
99.76
|
M/S Abdur Rakib Sikder
|
94.77
|
|
25/02/2012
|
20/11/2012
|
100
|
|
|
19/12/2018
|
|
105
|
Gopalganj
|
28
|
tungipara
|
232
|
253
|
PWA-UZC- Tungipara-206
|
Construction of Upazila Complex Extention Building
|
|
|
|
|
793.46
|
M/S Dhaka Mercantile Corporation Ltd.
|
928.83
|
|
15/03/2012
|
08/06/2013
|
100
|
|
|
19/12/2018
|
|
106
|
Habiganj
|
63
|
bahubal
|
480
|
253
|
PWA-UZC- Bahubal-94
|
Construction of Upazila Complex Extention Building & Hall Room
|
|
|
|
|
533.06
|
MBC & NB (JV)
|
476.74
|
|
02/03/2017
|
22/05/2018
|
5
|
|
|
19/12/2018
|
|
107
|
Habiganj
|
63
|
baniachong
|
458
|
253
|
PWA-UZC- Baniachong-96
|
Construction of Upazila Complex Extention Building & Hall Room
|
|
|
|
|
470.05
|
M/S Haque Trading Corporation
|
417.17
|
|
20/02/2017
|
12/02/2018
|
35
|
|
|
19/12/2018
|
|
108
|
Habiganj
|
63
|
chunarughat
|
479
|
253
|
PWA-UZC- Chunarughat-95
|
Construction of Upazila Complex Extention Building & Hall Room
|
|
|
|
|
427.08
|
M/S Shikder Enterprise
|
426.56
|
|
30/04/2015
|
30/08/2017
|
95
|
|
|
19/12/2018
|
|
109
|
Habiganj
|
63
|
habiganj-s
|
478
|
253
|
PWA-UZC-Habiganj-S-97
|
Construction of Upazila Complex Extention Building & Hall Room
|
|
|
|
|
485.84
|
MBC & NB (JV)
|
408.84
|
|
05/03/2017
|
04/09/2018
|
35
|
|
|
19/12/2018
|
|
110
|
Jamalpur
|
27
|
dewanganj
|
202
|
253
|
PWA-UZC- Dewanganj-225
|
Construction of Upazila Complex Extention Building & Hall Room
|
|
|
|
|
0.00
|
|
0.00
|
|
|
|
0
|
|
|
19/12/2018
|
|
111
|
Jamalpur
|
27
|
jamalpur-s
|
204
|
253
|
PWA-UZC- Jamalpur-S-224
|
Construction of Upazila Complex Extention Building & Hall Room
|
|
|
|
|
487.16
|
M/S Dhrobe Trade Agency
|
486.92
|
|
26/02/2017
|
25/05/2018
|
75
|
|
|
19/12/2018
|
|
112
|
Jamalpur
|
27
|
madarganj
|
205
|
253
|
PWA-UZC- Madargonj-129
|
Construction of Upazila Complex Extention Building & Hall Room
|
|
|
|
|
361.34
|
M/S Mirza Construction
|
349.99
|
|
05/06/2012
|
04/06/2013
|
100
|
|
|
19/12/2018
|
|
113
|
Jamalpur
|
27
|
sarishabari
|
207
|
253
|
PWA-UZC- Sharishabari-128
|
Construction of Upazila Complex Extention Building & Hall Room
|
|
|
|
|
442.48
|
M/S R-TA Enterprise &Mitu Traders (Jv)
|
365.77
|
|
15/02/2014
|
15/02/2015
|
82
|
|
|
19/12/2018
|
|
114
|
Jashore
|
41
|
bagherpara
|
300
|
253
|
PWA-UZC- Bagharpara-165
|
Construction of Upazila Complex Extention Building & Hall Room
|
|
|
|
|
466.19
|
MIM Construction
|
466.33
|
|
08/05/2018
|
07/05/2019
|
45
|
|
|
19/12/2018
|
|
115
|
Jashore
|
41
|
jhikargacha
|
302
|
253
|
PWA-UZC- Jhikorgacha-164
|
Construction of Upazila Complex Extention Building & Hall Room
|
|
|
|
|
444.64
|
Dhaly Construction Ltd
|
490.18
|
|
18/01/2018
|
07/01/2019
|
10
|
|
|
19/12/2018
|
|
116
|
Jashore
|
41
|
keshabpur
|
303
|
253
|
PWA-UZC- Kesabpur-167
|
Construction of Upazila Complex Extention Building & Hall Room
|
|
|
|
|
0.00
|
|
0.00
|
|
|
|
0
|
|
|
19/12/2018
|
|
117
|
Jashore
|
41
|
monirampur
|
305
|
253
|
PWA-UZC- Manirampur-163
|
Construction of Upazila Complex Extention Building & Hall Room
|
|
|
|
|
459.09
|
EP-ZK (JV)
|
417.86
|
|
|
|
100
|
|
|
19/12/2018
|
|
118
|
Jashore
|
41
|
sarsha
|
306
|
253
|
PWA-UZC- Sharsha-166
|
Construction of Upazila Complex Extention Building & Hall Room
|
|
|
|
|
420.76
|
M/S Mohidul Islam
|
398.59
|
|
16/04/2015
|
15/07/2016
|
100
|
|
|
19/12/2018
|
|
119
|
Jhalokathi
|
6
|
kathalia
|
32
|
253
|
PWA-UZC- Kathalia-184
|
Construction of Upazila Complex Extention Building & Hall Room
|
|
|
|
|
605.50
|
M/S Kohinoor Enterprise
|
544.95
|
|
25/09/2017
|
01/10/2018
|
60
|
|
|
19/12/2018
|
|
120
|
Jhalokathi
|
6
|
nalchity
|
33
|
253
|
PWA-UZC- Nalchiti-185
|
Construction of Upazila Complex Extention Building & Hall Room
|
|
|
|
|
645.22
|
M/S Amir Engineering
|
674.32
|
|
|
|
0
|
|
|
19/12/2018
|
|
121
|
Jhenaidah
|
36
|
kaliganj
|
309
|
253
|
PWA-UZC- Kaligonj-169
|
Construction of Upazila Complex Extention Building & Hall Room
|
|
|
|
|
562.74
|
Md. Moyenuddin Bashi
|
556.87
|
|
05/09/2015
|
04/12/2016
|
90
|
|
|
19/12/2018
|
|
122
|
Jhenaidah
|
36
|
shailkupa
|
265
|
253
|
PWA-UZC- Sailokupa-170
|
Construction of Upazila Complex Extention Building & Hall Room
|
|
|
|
|
497.16
|
UCL-MME-MPT (JV)
|
521.09
|
|
|
|
100
|
|
|
19/12/2018
|
|
123
|
Joypurhat
|
50
|
joypurhat-s
|
346
|
253
|
PWA-UZC- Joypurhat-S--28
|
Construction of Upazila Complex Extention Building & Hall Room
|
|
|
|
|
439.47
|
M/S MI Trading & CO.
|
379.47
|
|
17/01/2016
|
17/03/2017
|
100
|
|
|
19/12/2018
|
|
124
|
Joypurhat
|
50
|
khetlal
|
361
|
253
|
PWA-UZC- Khetlal-526
|
Construction of Upazila Complex Extention Building & Hall Room
|
|
|
|
|
467.04
|
Mc Ke Re (JV)
|
420.33
|
|
31/03/2018
|
30/03/2019
|
0
|
|
|
19/12/2018
|
|
125
|
Khagrachari
|
16
|
dighinala
|
112
|
253
|
PWA-UZC- Dighinala-63
|
Construction of Upazila Complex Extention Building & Hall Room
|
|
|
|
|
488.90
|
M/S Rupali Traders
|
440.01
|
|
03/01/2017
|
27/06/2018
|
45
|
|
|
19/12/2018
|
|
126
|
Khagrachari
|
16
|
Guimara
|
490
|
253
|
PWA-UZC- Guimara-290
|
Others Construction (Water Supply)
|
|
|
|
|
0.00
|
|
0.00
|
|
|
|
0
|
|
|
19/12/2018
|
|
127
|
Khagrachari
|
16
|
Guimara
|
490
|
253
|
PWA-UZC- Guimara-289
|
Others Construction (Electrification)
|
|
|
|
|
0.00
|
|
0.00
|
|
|
|
0
|
|
|
19/12/2018
|
|
128
|
Khagrachari
|
16
|
Guimara
|
490
|
253
|
PWA-UZC- Guimara-288
|
Others Construction (Internal Road & Boundary wall)
|
|
|
|
|
0.00
|
|
0.00
|
|
|
|
0
|
|
|
19/12/2018
|
|
129
|
Khagrachari
|
16
|
Guimara
|
490
|
253
|
PWA-UZC- Guimara-287
|
Land Development
|
|
|
|
|
0.00
|
|
0.00
|
|
|
|
0
|
|
|
19/12/2018
|
|
130
|
Khagrachari
|
16
|
Guimara
|
490
|
253
|
PWA-UZC- Guimara-286
|
Construction of Dormitory
|
|
|
|
|
0.00
|
|
0.00
|
|
|
|
0
|
|
|
19/12/2018
|
|
131
|
Khagrachari
|
16
|
Guimara
|
490
|
253
|
PWA-UZC- Guimara-285
|
Construction of Twin Qrtr.
|
|
|
|
|
0.00
|
|
0.00
|
|
|
|
0
|
|
|
19/12/2018
|
|
132
|
Khagrachari
|
16
|
Guimara
|
490
|
253
|
PWA-UZC- Guimara-284
|
Construction of UNO Qrtr.
|
|
|
|
|
0.00
|
|
0.00
|
|
|
|
0
|
|
|
19/12/2018
|
|
133
|
Khagrachari
|
16
|
Guimara
|
490
|
253
|
PWA-UZC- Guimara-283
|
Construction of Upazila Chairman Qrtr.
|
|
|
|
|
0.00
|
|
0.00
|
|
|
|
0
|
|
|
19/12/2018
|
|
134
|
Khagrachari
|
16
|
Guimara
|
490
|
253
|
PWA-UZC- Guimara-278
|
Construction of Upazila Complex Extention Building & Hall Room
|
|
|
|
|
0.00
|
|
0.00
|
|
|
|
0
|
|
|
19/12/2018
|
|
135
|
Khagrachari
|
16
|
matiranga
|
124
|
253
|
PWA-UZC- Matiranga-62
|
Construction of Upazila Complex Extention Building & Hall Room
|
|
|
|
|
506.91
|
Delta Engineering & Consortium
|
466.00
|
|
20/10/2016
|
20/01/2018
|
90
|
|
|
19/12/2018
|
|
136
|
Khulna
|
35
|
dighalia
|
270
|
253
|
PWA-UZC- Dighalia-153
|
Construction of Upazila Complex Extention Building & Hall Room
|
|
|
|
|
638.65
|
M/S Azam Construction-MH (JV)
|
523.60
|
|
|
|
100
|
|
|
19/12/2018
|
|
137
|
Khulna
|
35
|
dumuria
|
274
|
253
|
PWA-UZC- Dumuria-154
|
Construction of Upazila Complex Extention Building & Hall Room
|
|
|
|
|
752.85
|
Esha-Mbpl-Mohiuddin (JV)
|
677.57
|
|
20/11/2017
|
20/11/2018
|
20
|
|
|
19/12/2018
|
|
138
|
Khulna
|
35
|
koira
|
275
|
253
|
PWA-UZC- Kayra-151
|
Construction of Upazila Complex Extention Building & Hall Room
|
|
|
|
|
440.14
|
M/S Esha Enterprise
|
625.35
|
|
21/11/2012
|
20/11/2013
|
100
|
|
|
19/12/2018
|
|
139
|
Khulna
|
35
|
terokhada
|
278
|
253
|
PWA-UZC- Terokhada-529
|
Construction of Upazila Complex Extention Building & Hall Room
|
|
|
|
|
548.21
|
M/S Ziaul Traders
|
547.89
|
|
09/08/2017
|
08/08/2018
|
15
|
|
|
19/12/2018
|
|
140
|
Kishoreganj
|
19
|
austagram
|
195
|
253
|
PWA-UZC- Austagram-126
|
Construction of Upazila Complex Extention Building & Hall Room
|
|
|
|
|
499.14
|
M/S Shahidul Islam
|
433.97
|
|
03/08/2015
|
03/11/2016
|
100
|
|
|
19/12/2018
|
|
141
|
Kishoreganj
|
19
|
bhairab
|
197
|
253
|
PWA-UZC- Bhairab-123
|
Construction of Upazila Complex Extention Building & Hall Room
|
|
|
|