City Governance Project (CGP) (CGP)

Serial District Name District Code/ID Upazila Name Upazila Code/ID Project ID Package No Scheme Name Road ID Length of Scheme(Km) - Road Length of Scheme(m) - Bridge/Culverts Building Quantity Estimated Amount(LAC) Contractor Name Contract Amount(LAC) Date of Contract (DD/MM/YYYY) Date of commencement (DD/MM/YYYY) Date of Completion (DD/MM/YYYY) Physical Progress(%) Financial Progress (Amount) (LAC) Financial Progress(%) Date of Progress Update (DD/MM/YYYY) Remarks
1 Chattogram 11 mirsharai 68 291 ChCC2-15 New construction of Rabindra Nazrul high school cum cyclone center. 1.00 1094.39 Consonence Engineers and Builders & Abul Bashar (JV) 905.86 16/08/2017 09/11/2018 0 07/02/2019  
2 Chattogram 11 mirsharai 68 291 ChCC2-14 New construction of Patantully boys high school cum cyclone center. 1.00 632.85 M/S Monir Ahmed-Hossan & Brothers(JV) 529.75 17/08/2017 09/11/2018 0 07/02/2019  
3 Chattogram 11 mirsharai 68 291 ChCC2-13 Re-construction of West Madarbari girls high school cum cyclone center 1.00 616.12 M/S Quashem Construction 542.19 02/05/2017 26/07/2018 0 07/02/2019  
4 Chattogram 11 mirsharai 68 291 ChCC2-12 Re-construction of East Madarbari girls high school cum cyclone center 1.00 451.02 M/S Tohid & Brothers 371.09 02/05/2017 26/07/2018 0 07/02/2019  
5 Chattogram 11 mirsharai 68 291 ChCC2-11 Re- construction of Laldighi Community Centre Cum Cyclone Shelter. 1.00 1515.64 M/S Hasan & Brothers, Anantan BikashTripura Jv 1295.92 30/11/2017 23/02/2019 0 07/02/2019  
6 Chattogram 11 mirsharai 68 291 ChCC2-10 New construction of Ahmed Mia City Corp. Girls School Cum Cyclone Shelter 1.00 790.07 M/S Tohid & Brothers 685.36 19/05/2017 06/09/2018 0 07/02/2019  
7 Chattogram 11 mirsharai 68 291 ChCC2-9 New construction of Mohabbat Ali Girls High School Cum Cyclone Shelter. 1.00 736.34 M/S Quashem Construction 642.38 30/11/2017 23/02/2019 0 07/02/2019  
8 Chattogram 11 mirsharai 68 291 ChCC2-08 New construction of Six Storied Building at Patanga Girls High School and Colledge Cum Cyclone Shelter. 1.00 2085.57 Dhaly Construction Ltd. 2064.72 02/09/2018 25/11/2019 0 07/02/2019  
9 Chattogram 11 mirsharai 68 291 ChCC2-17 Reconstruction of road by RCC from Sotsong Asrom Nibash to Soroni Road (Ch-0+00 to Ch-1+503) 3.10 679.49 M/S Quashem Construction 639.01 05/07/2017 25/12/2018 0 07/02/2019  
10 Chattogram 11 mirsharai 68 291 ChCC2-16 Contruction of 65m Bridge on Marinars Road 970.32 S Ananta & Abdus Salam JV 867.00 0 07/02/2019 NOA Issued
11 Chattogram 11 mirsharai 68 291 ChCC2-04 Improvement of Agrabad access road by overlay and widening with BC (Ch-0+00 to Ch-2+378) 7.13 5103.31 MBEL-ROYAL Jv BGMEA 4896.67 04/12/2017 13/05/2019 0 07/02/2019  
12 Chattogram 11 mirsharai 68 291 ChCC2-03 Improvement of port connecting road by BC from Alaker to Nimtola Ch-4+289 to Ch.6+371. 6.25 5391.48 Rana -Saleh Jv 5084.70 05/12/2017 13/05/2019 0 07/02/2019  
13 Chattogram 11 mirsharai 68 291 ChCC2-02 Improvement of port connecting road from Alaker to Nimtola (Ch-2`+400 to Ch-4+289) by Bituminous Carpeting. 5.67 5354.45 Rana Builders 5063.00 05/12/2017 13/05/2019 0 07/02/2019  
14 Chattogram 11 mirsharai 68 291 ChCC2-01 Improvement of Port Connecting Road from Alanker to Nimtola By BC. Ch. 1+450 to Ch.2+400km 2.85 4323.36   0.00 0 07/02/2019 Evaluation on Process
15 Cumilla 10 cumilla-s 95 291 CoCC2-07 Installation of street lighting system in different areas of CoCC (2550 Nos. GI Pole with 2550 Nos. LED Street light Including all accessories) 2068.61 PDL-IEL-MDHV(JV) 1949.60 22/01/2018 21/01/2019 0 07/02/2019  
16 Cumilla 10 cumilla-s 95 291 CoCC2-06 Installation of 9 nos production Tube-wells including pump house with all other accessories in ward no 01 to 27 568.09 MSST-MCS JV 584.56 27/11/2018 26/11/2019 0 07/02/2019  
17 Cumilla 10 cumilla-s 95 291 CoCC2-08 b) Construction of Drain, Footpath & Road at Fazlul Hoque Road (From Kandirpar to Rajgonj) (Ch. 0+00 to 0+729) and Construction of Drain & Footpath from Post Office or Circuit House to Rajgonj (Ch. 0+000 to 0+626). c) Re-construction of Drain Judge Court-Eidgah-Stadium Market-New Market-Kandirpar to Circit House road side Khal at Hotel Salauddin (Ch. 0+000 to 1+900). 5.02 1506.45 Rana builders 1565.77 22/01/2018 21/01/2019 0 07/02/2019  
18 Cumilla 10 cumilla-s 95 291 CoCC2-05 (a) Excavation of Khal from Medical Hospital to EPZ road with beautification. ( Ch. 00 + 00 to 00 + 800 m.) (b) Excavation of Airport khal (EPZ poket gate to Gopenathpur khal/Canal) . ( Ch. 00 + 00 to 05 + 000 m.) (c) Excavation of Unaishar khal (South- Westen side of EPZ wall to Gopenathpur khal/Canal via Kazipara-Hirapur) with beautification ( Ch. 00 + 00 to 7 + 000 m.) (d) Excavation of Kuchaitoly khal (Kuchaitoly to Gopenathpur khal/Canal via Donessor-Rajapara-Tarapaia) . ( Ch. 00 + 00 to 15 + 000 m.) (e) Excavation of Sonaichori khal/Canal (from Pathankot to Gopenathpur khal/Canal via Chowara Bazar Matiara) . ( Ch. 00 + 00 to 06 + 000 m.) 28.47 1665.06 HASAN TECHNO BUILDERS,TAHER BROTHERS LTD (JV) 1663.91 09/07/2018 03/09/2019 0 07/02/2019  
19 Cumilla 10 cumilla-s 95 291 ICGP B2 CoCC09 b) (i) Reconstruction of drain from Akther Hamid Khan road to Morden Hospital and Nowgaon chowmohoni (Laksam road) via RAB office, Ch.0+000-1+063. b) (ii) Reconstruction of drain from Akther Hamid Khan road to Morden Hospital and Nowgaon chowmohoni (Laksam road) via RAB office, Link, Ch.0+000-0+341. c) (i) Reconstruction of Rampur road from Kourt bari road (Cantonment gate and opposite side of land office) to Kourt bari road (Moynamoty Housing) via Rampur area, Ch.0+000-1+690. 1 x 1 m x 1 m Size Box Culvert at Ch.0+603, 0+825, 0+928, 1+207, 1+351, 1+385. & 1 x 3 m x 1.5 m Size Box Culvert at Ch.1+325,& 1x1.5mx1.5m box culvert at Ch.1+588. c) (ii) Reconstruction of Rampur road from Kourt bari road (Cantonment gate and opposite side of land office) to Kourt bari road (Moynamoty Housing) via Rampur area, Link, Ch.0+000-0+593. 1 x 1.5 m x 1.5 m Size Box Culvert at Ch.0+476. f) (ii) Reconstruction of drain from Laksam road to Easin market via Mirpukurpar, Ch.0+000-0+402. g) Reconstruction of drain from Thomson bridge - EPZ (North side) - Housing Estate - Medical College near Bakhrabad Gas office.Ch.0+000-2+450. & Link drain At Ch.1+755(R/S), Ch.0+000-0+250. 6.79 1466.38 Hasan builders 1466.22 17/12/2017 16/12/2018 0 07/02/2019  
20 Cumilla 10 cumilla-s 95 291 ICGP B2 CoCC04 (c) Re-construction of 8m span R.C.C. Bridge at Kazipara. (d) Re-construction of 8m span R.C.C. Bridge at Near Noagah Chowmohony over katakhali khal. (h) Construction of 3X5.0mX4.0m RCC Box Culvert at Rececourse Khalpar 0.04 528.05 HASAN BUILDERS 528.05 17/12/2017 16/12/2018 0 07/02/2019  
21 Cumilla 10 cumilla-s 95 291 ICGP B2 CoCC-03 Part: 1, Road Improvement a) Reconstruction of Road Start From Old Dhaka-Chittagong Highway Road to Airport Road (Laxmipur Chownohony) Via Gram Chowara And Laxmipur By B.C From I.SG.( Ch. 0+000 to 02+ 855 m). b) Reconstruction of Road Start From Old Dhaka-Chittagong Highway road (Near City Corporation Office) Via Raypur, Dayapur. Link From Doyapur Madrasa to Dhaka-Chittagong Highway Road By B.C From I.SG. (Ch. 0+000 to 02+ 772 m). c) Contraction of Road Start From Dhaka-Chittagong Highway Road to Airport Road, Domoria Road & Tarapaia Road Via Laxminagar, Laxmipur Katcha Road By B.C (Ch. 00+00 to 02+ 284 m) Link -1(Ch. 0+ 000 To 0+ 278) Link -2(Ch. 0+000 To 0+ 625) d) Reconstruction of Road Start From Old Dhaka-Chittagong Highway Road (Old Chowara) to Rajapara (Near Post Office) Via Domoria, Tarapaia & Noapara By B.C From I.S.G (Ch. 0+000 to 03+302m) e) Reconstruction of Dhaneshor Road (From Old Dhaka - Chittagong Highway Road to Airport Road) By B.C From I.S.G. (Ch.0+000 to 02+368m). f) Reconstruction of Road Start From Old Dhaka-Chittagong Highway Road to Airport Road Via Goalmothon & Rajapara By B.C From I.S.G (Ch.0+000 to 02+812m). Link -1 (Ch.0+000 to 0+700) g) Reconstruction of Road Start From Old Dhaka-Chittagong Highway Road (Chowara Madrasha & Chira Mill) to Dhaka-Chittagong Highway Road (Matiara & Chashapara) By B.C From I.S.G.(Ch.0+000 to 1+148m). Link -1 (Ch.0+000 to 0+657) Link-2 (Ch.0+000 to 0+539) Part: 2, Drainage a) Contruction of Drain (RCC) From Laxmipur Khal to Dhaka- Chittagong Highway Besides Airport Road & From Doyapur Madrasa (Ch. 0+000-0+712)Link -1 (Ch.0+000-1+372) b) Contruction of Drain (RCC) From Sonaichori Khal to Funka Industries Besides Old Dhaka-Chittagong Highway Road.(Ch.0+000-2+449) 24.87 4260.58 HASAN TECHNO BUILDERS,TAHER BROTHERS LTD (JV) 4259.42 20/06/2018 26/10/2019 0 07/02/2019  
22 Cumilla 10 cumilla-s 95 291 CoCC2-02 (a) Reconstruction of road Start from Dhaka-Chittogong Highway road (Joypur) to Kotbari road (Singapur Market) area by B.C. from I.S.G. (b) Reconstruction of road Start from Kotbari road (Beltoly school gate) to Batabaria moszid by B.C. from I.S.G. (c) Development of Monipur road (from Batabaria to City Boundary) by B.C. from I.S.G. (d) Reconstruction of road Start from Kotbari road (Gondmoty moszid) to Museum road (Shalbon High school & opposite side of BARD Boundary) & Gabtoly Beby Stand via Bagmara & Lalmai area. Link : Morapara road & Mannan Darbesh house road by B.C. from I.S.G. (e) Repairing of Museum road (Kotbari road to University) by Base Course and B.C. 21.82 3816.06 RAB-RC(PVT)LTD,M/S HOQUE ENTERPRISE (JV) 3815.70 20/06/2018 26/10/2019 0 07/02/2019  
23 Cumilla 10 cumilla-s 95 291 CoCC2-01 (a) Reconstruction of road Start from Kazipara road (Pry. School) to Kazipara road (Graveyard) via Kazipara area by B.C. from I.S.G. (b) Development of road from Old Ctg road (Chowara cattle market) to Dhaka – Chittagong Highway(matiara) via hindu para+ 1 bridge (30m) (c) Reconstruction of road from Lacsam road to Airport road, and Kazipara road via herapur ,Mostapur, Laxminagar, Disabond and Kazipara (d) Construction of Drain (RCC/Briek/ Pipe) from EPZ khal to Laxminagar Chowmohony, Asrayon, Airport road.by RCC 3.20 1041.12 MAMCL-PC-SAS(JV) 1040.87 17/12/2017 16/12/2018 0 07/02/2019  
24 Gazipur 21 gazipur-s 174 291 GCC2-14 Installation of 3 Nos Production Tube wells,Pump house,Necessary electrical work with 10.00km distribution pipe line at Zone-2,4 5 respectively 1900.21 RFL Plastics Limited 1595.35 0 07/02/2019 NOA Issued
25 Gazipur 21 gazipur-s 174 291 GCC2-13 Construction of drain along the side of Nowzour to Zirani Bazar (starting from Zitermour to west direction up to 6.75 Km). (Ch. 00+000 to 6+750) 6.75 1664.38 Wahid Construction ltd 1572.38 26/02/2017 14/09/2018 0 07/02/2019  
26 Gazipur 21 gazipur-s 174 291 GCC2-11 Construction of RCC Drain along side of Khapara road lasr part (up to Tilargati road ) Ch. 1+375 to Ch-3+810 3.19 643.76 MRC-MKH(JV) 575.00 26/02/2017 21/04/2018 0 07/02/2019  
27 Gazipur 21 gazipur-s 174 291 GCC2-07 Cosntruction of drain from Dhaka-Mymensingh highway to Dhaka bypass road via Gorib & Gorib factory & vogra bazar. (Ch. 00+00 to 1+400) b) Construction of drain from Mogorkhal to Kadda-Turag Khal along Dhaka By pass road Ch.0+0 to 3+950 5.18 1500.77 MDJ Associates 1373.73 19/05/2017 25/06/2018 19 07/02/2019  
28 Gazipur 21 gazipur-s 174 291 GCC2-04 Construction of RCC Drain along side of Tongi Vadam road at Ch. 0+00 to Ch-4+125 5.22 854.54 MRC-MKH(JV) 740.58 26/02/2017 21/04/2018 0 07/02/2019  
29 Gazipur 21 gazipur-s 174 291 GCC2-12 Repairing & Widening of BC road from Nowzour to Zirani Bazar (starting from Zitermour to west direction up to 6.75. Km). (Ch. 0+00 to 6+750) 6.75 1210.07 NT-RA(JV) 1062.33 14/05/2017 30/11/2018 0 07/02/2019  
30 Gazipur 21 gazipur-s 174 291 GCC2-10 Repairing & widening of Khapara road (starting from Dhaka -Mymenshinhg road to Vadam road via Tilargati) (Ch-0+00 to Ch-3+810 ) By RCC Work 4.36 1237.65 Wahid Construction ltd 1167.30 17/04/2017 22/12/2018 0 07/02/2019  
31 Gazipur 21 gazipur-s 174 291 GCC2-09 Repairing & Widening of BC road from Dhaka-Pubail road at Markun K2 factory to Harbaid Bazar via Maruka. (Ch. 0+00 to Ch-5+950) 5.95 921.26 MAQ Engineering ltd. 882.83 30/03/2017 04/06/2018 0 07/02/2019  
32 Gazipur 21 gazipur-s 174 291 GCC2-08 Repairing & Widening of BC Road from Shibbari Moor to Zoorpukur & Repairing and Widening of Road from Zoorpukur Moor to Titarkul. (Ch.0+045 to 3+625) & Repairing and widening of BC road from Surabari Rice mill to Kashimpur-Sreepur Road Kazi Market Mr.Malek House via Shaildubi Member Market. Ward No (04 & 05). 6.75 1105.02 NT-MMB(JV) 994.51 31/01/2018 26/01/2019 0 07/02/2019  
33 Gazipur 21 gazipur-s 174 291 GCC2-06 Repairing & Widening of Joybangla road by RCC/BC (Barobari to Maghdubi bypass via Akkas marker) including a Link Road L=8280m 10.03 1434.04 Wahid Construction ltd 1349.78 18/05/2017 23/01/2019 0 07/02/2019  
34 Gazipur 21 gazipur-s 174 291 GCC2-05 a) Repairing & Widening of BC Road from Kashimpur to Sreepur connecting road (UP to Mother Textile). (RCC Road Ch. 0+000-4+500)(Link-1 BC Road Ch.0+380-1+277.7) and 530m link-2 RCC road with side drain (Engineer bari road starting from Gacha polasona main road) b) Construction of RCC drain at Kashimpur to Sreepur connecting road (Zitermoor to Mother textile) (Ch.0+000 to 4+500) & Link (Ch.0+000- 11.82 2337.09 MKE-CDC-NPIL Jv 2123.94 29/11/2017 23/11/2018 0 07/02/2019  
35 Gazipur 21 gazipur-s 174 291 GCC2-03 Repairing & widening of Tongi Vadam road by RCC work (Ch-1+651 to Ch-4+150 & Link-1 road by BC ch-0+100 to Ch-0+950 & Link-2 road by RCC Ch-0+625) 3.97 993.78 MRC-MKH (JV ) 953.86 17/04/2017 11/04/2018 0 07/02/2019  
36 Gazipur 21 gazipur-s 174 291 GCC2-02 a. Repairing & Widening of BC road from Maleker bari (Dhaka-Mymanshingh Highway) to Bashan sarak via Ojerpara & Haque Market. (Ch. 00+000 to 6+650 & a link Ch-0.0 to 0+763). b. Construction of RCC drain along the side of Maleker bari raod (Dhaka-Mymanshingh Highway) to Bashan sarak via Ojerpara & Haque Market. (Ch.0.0 to -1+950), 12.72 1972.08 CDC-NPL(JV) 1744.78 22/06/2017 28/08/2018 0 07/02/2019  
37 Gazipur 21 gazipur-s 174 291 GCC2-01 Repairing & Widening of Road by BC from Vanuya to Banomala rail crossing via Joydebpur-Dhirasram, Haydarabad. (Ch-0+00 to Ch-15+259) 15.26 3335.92 RAB-RC(pvt) Ltd & Dawn Corporation(JV) 3283.43 16/11/2017 10/11/2018 0 07/02/2019  
38 Narayanganj 20 narayanganj-s 198 291 NCC2-09 a) Construction of RCC Drain Starting from Godnail Lal Building to Anayetnagar Lacky Bazzar Ch.0+000-2+505. (b) Construction of Drain (RCC/Brick/Pipe) Starting from Tatkhana more upto WAPDA Canal via Sayedpara wooden bridge, sayedpara kafil uddin Garments & the H/O mr. shamim at ward no.-08. Ch.0+000-0+670. (Total Length with 7 link drain=1616.0m) (c) Construction of RCC Drain(RCC/Brick/Pipe) Starting from Tatkhana Government Primary school to Chowdhuri bari road via Dr. Kuddus house at word no.-8. Ch.0+000-0+292 & Link Ch.0+000-0+100. (d) Construction of RCC Drain(RCC/Brick/Pipe) Starting from Starting from Dhanakunda Saudbari to rail line & Barepara Aklim Mia House at ward No.-08. Ch.0+000-0+170. (e) Construction of drain (RCC/Brick/Pipe) starting from Modhugar connecting upto WAPDA canal at ward no-08.Ch.0+000-0+356. Total Length (including 8 nos. Link Drain)=1840m. (f) Construction of Drain (RCC/Brick/Pipe) at Jhalkuri Starting from amtala mor to wapda canal via east side & Jhalkuri khola market at word no.-9. Ch.0+000-0+735, Ch.0+000-0+493(Link-1), Ch.0+000-0+288(Link-2). (g) Construction of Drain (RCC/Brick/Pipe) at Jhalkuri Starting from Jalkuri Naintarpar to Karoitala via Firoz Master House at ward no.-09. Ch.0+000-0+650, Ch.0+000-0+599(Link-1), Ch.0+000-0+100(Link-2), Ch.0+000-0+118(Link-3). (h) Construction of drain (RCC/Brick/Pipe) at Jalkuri starting from Jalkuri Wapda canal Culvert to end of NCC & Goramara Mosque-E-Noor via Rajmahal Chinema Hall at ward no-9. Ch.0+000-0+225, Total Length (including Link drain)=837m. (i) Construction of Drain (RCC/Brick/Pipe) at Jhalkuri Starting from Jalkuri Transmeter to Sheikderbari pool via Taher Ali House & Jalkuri Graveyard at ward no.-9. Ch.0+000-0+580. Ch.0+000-0+580(Link-1), Ch.0+000-0+190(Link-2) (j) Construction of Drain (RCC/Brick/Pipe) at Jhalkuri Starting from Modhugar Mojibor Poulty firm to Wapda canal near Ali Hossain House via Dewan Jame Mosque at ward no-9. Ch.0+000-0+400, Ch.0+000-0+370(Link-1), Ch.0+000-0+580(Link-2) 12.87 2144.52 Mir Habibul Alam-Udayan Builders(JV) 1917.36 10/08/2017 13/12/2018 0 07/02/2019  
39 Narayanganj 20 narayanganj-s 198 291 NCC2-07 Re-excavation of main canal from bhangar poll to Shimrail galakata bridge along with Protective Works by CC Block lining at west side of the main canal in Siddhirganj (Ch.0+000km to 5+538Km) at both sides. 5.20 5834.50   0.00 0 07/02/2019 Evaluation on process
40 Narayanganj 20 narayanganj-s 198 291 NCC2-12 a) Re-construction of Road and Drain by RCC starting from AEPZ Road to Sumilpara Road in ward No-06 at Ch.000 to 0646. b) Re-construction of Char Sumilpara road by RCC with RCC drain in ward No06 Length350m & 6 nos link road length 1099m total effective length1449m. c) Re-construction of RCC road with RCC drain from Kaiums house to Noardapara moszid in ward no-24 Length86m & 1 Nos Link Road Length134m Total Effective length220m. d) Construction of Road by RCC with side drain in Shitolankha housing under Ward no.11including 4 Nos Link Road Effective length674m. e) Re-construction of drain & road by RCC from 100-0 road to Baitul Mamur Madrasha via Roman house beside Kadamrasul College in ward no-23Length400m & 1 Nos Link Road Length117m Total Effective length517m. f) Re-construction of RCC road with RCC drain from Bugbari Bus road to Bhandary bari in ward no-23 (Ch.000 to 0480). 8.61 1180.24 Starline Services Limited 1068.11 08/10/2017 13/12/2018 0 07/02/2019  
41 Narayanganj 20 narayanganj-s 198 291 NCC2-11 Re-construction of road by RCC with Road Side RCC Drain, from Nobiganj Bazar to Dakesshay Mill. Ch(00-4432m) including some Links 3.91 791.31 M/S Munia Traders 749.43 23/05/2017 17/10/2018 0 07/02/2019  
42 Narayanganj 20 narayanganj-s 198 291 NCC2-10 (i) Construction of 40.00m long RCC foot over bridge over WAPDA main canal at Ch.0+280km (ii) Construction of 33.00m long RCC bridge over WAPDA main canal at Ch.1+200km (iii) Construction of 38.00m long RCC bridge over WAPDA main canal at Ch.2+130km (iv) Construction of 46.25m long RCC foot over bridge over WAPDA main canal at Ch.2+630km (v) Construction of 34.00m long RCC bridge over WAPDA main canal at Ch. 3+550km (vi) Construction of 37.00m long RCC foot over bridege over WAPDA main canal at Ch.5+150km. 0.23 3813.80 Mir Habibul Alam-Udayan Builders(JV) 3584.87 25/11/2018 19/03/2020 0 07/02/2019  
43 Narayanganj 20 narayanganj-s 198 291 NCC2-06 Construction of 20m span RCC Luhia Bridge over Nabiganj Khal on Nobiganj Bazar to Dakesshay Mill Road at Chainage 0+350m and 22m span RCC Lakankhola Brige over Lakhankhola Khal on Nobiganj Bazar to Dakesshay Mill Road at Chainage 2+750. 0.04 556.34 Prominent -Quashem (JV) 482.36 05/03/2017 31/10/2018 0 07/02/2019  
44 Narayanganj 20 narayanganj-s 198 291 NCC2-05 a) Construction of 15m long RCC bridge over WAPDA canal near Lithigarments at ward no-3,; 14m long RCC bridge (Abdul Ali pool) at ward no-2, 10m long RCC culvert near Rahim market at ward-02, b) Reconstruction of 60m long RCC birdge over Shitalakkhya Khal at Shaheed Nagar in ward no-18 c) Reconstruction of 60m long RCC bridge over Shitalakkhya khal at Sayedpur in ward no-18, d) Construction of 12m long RCC bridge over Nolkhali Khal near Knit conern at ward no-10. 0.13 2098.27 Prominent -Quashem (JV) 1845.95 05/03/2017 31/12/2018 0 07/02/2019  
45 Narayanganj 20 narayanganj-s 198 291 NCC2-04 a) Construction of 18m etre span RCC Tribini Bridge over Tribini Khal on Madanganj power grid to Nabigonj bus stand Road at Chainage 1+735 m. Ward-21 b)Construction of 20m metre span RCC Baparipara Bridge over Baparipara Khal on Madanganj power grid to Nabigonj bus stand Road at Chainage 0+370 m. 0.04 892.12 Prominent -Quashem (JV) 779.16 05/03/2017 31/12/2018 0 07/02/2019  
46 Narayanganj 20 narayanganj-s 198 291 NCC2-03 Re-construction of road by RCC with Road Side RCC Drain, from Nobiganj Bazar to Dakesshay Mill. Ch(00-4432m) including some Links 16.05 2841.86 Rana Builders & Hasan Builders (JV) 2700.33 23/05/2017 31/12/2018 0 07/02/2019  
47 Narayanganj 20 narayanganj-s 198 291 NCC2-02 a) Re-habilitation of road & drain with link from lithi garmentsd to dhaka-Chittagong highway road vai london market & Nemai kaisari bazer by RCC in ward-03 Length 1582 & 8 nos. Link road length:2796.0m Total Effective length4378.0m 11.39 1931.42 M/S Ratna Enterprise 1693.74 08/10/2017 08/11/2018 0 07/02/2019  
48 Narayanganj 20 narayanganj-s 198 291 NCC2-01 a) Improvement of Bhasha Sainik Sarak by RCC with Footpath cum RCC drains in ward no-13 (Ch 0+00 to 0+400.00m), b) Construction of CC road with RCC drain beside Paikpara Big Graveyard in ward no-17 & 18 (Ch 0+00 to 0+700.00m), c)Construction of RCC road & Drain starting from Shantibag Stadium road near EURO Garments upto north line of Islam Nagar WAPDA canal in ward No:08 (Ch 0+00 to 0+ 615m ) . 4.13 711.25 MAM Construction Ltd 674.79 12/07/2017 30/11/2018 0 07/02/2019  
49 Pabna 49 ishwardi 374 291 RpCC2-11 Construction of Bus Terminal at Bodorganj road Rangpur. 2868.64 PMPL-KSA JV 2581.77 06/09/2018 19/09/2018 0 07/02/2019  
50 Pabna 49 ishwardi 374 291 RpCC2-04 Construction of 4 nos production tube-well (PTW), 3 nos overhead tank including pump and 50km distribution line in different places of Rangpur City Corporation 50.00 1882.66 M/S MT & SS Construction 1876.92 03/09/2018 13/09/2019 0 07/02/2019  
51 Pabna 49 ishwardi 374 291 RpCC2-02 Replacement of 12.50km Old Asbestos/ MS Water Supply Pipe line from Medical Moure to Mahigonj and Construction of 6 nos production tube-well (PTW) including pump house, pump and 32.0 km distribution line at different places of Rangpur City Corporations. 44.50 1506.22 FSL-TCEL JV 1414.69 06/09/2018 19/09/2019 0 07/02/2019  
52 Pabna 49 ishwardi 374 291 RpCC2-25 a)Contruction of drain beside Nilkantha road.(Ch 0- 2.1 km.) b)Contruction of drain starting from behind of Kotwali thana to Mulatol Madrasha. (Ch 0- 0.7 km.) c)Contruction of drain beside Babukha Shantipara (Hindupara) road side drain.(Ch 0- 1.0 km.) d)Contruction of drain beside Dhopapotty road & Beltola road.(Ch 0- 0.8 km) 2.50 590.90 Rafiq constructionco(pvt)Ltd-Ujjal Kumar Dey 584.02 21/03/2018 31/03/2019 0 07/02/2019  
53 Pabna 49 ishwardi 374 291 RpCC2-24 a)Contruction of drain from Satgara Mistrypara road. (Ch 0- 2.1 km.) b)Contruction of drain beside Nisbetgonj road.(Ch 0- 2.2 km.) c)Contruction of drain Beside Salema Khatun road. Ch 0- 1.2 km.) 5.07 954.40 Rafiq constructionco(pvt)Ltd-Ujjal Kumar Dey 909.76 21/03/2018 31/03/2019 0 07/02/2019  
54 Pabna 49 ishwardi 374 291 RpCC2-23 a)Contruction of drain from Satgara H/O Shaheen to Satgara Madrasa. (Ch 0- 2100 m.) b)Contruction of drain from Purba Vogi H/O Shahider to Nengrar more. (Ch 0- 3.61m.) 4.32 756.45 Shamsurjaman& Shajahan Ali( JV) 680.79 20/06/2017 23/08/2018 0 07/02/2019  
55 Pabna 49 ishwardi 374 291 RpCC2-22 a) Contruction of drain (RCC/Brick/Pipe) besideIslambug internal road. (Ch 0- 2693mm.) b) Contruction of drain (RCC/Brick/Pipe) from Satgara Kamil Madrasa to MP Checkpost.(Ch 0- 2027m) 2.90 817.94 Md.Khairul Kabir Rana 874.53 10/10/2017 09/10/2018 0 07/02/2019  
56 Pabna 49 ishwardi 374 291 RpCC2-21 a)Contructiont of drain (RCC/Brick/Pipe) from Modern more Dimond Hotel to R.K road Shutki Godown.(Ch 0- 1230 m.) b)Contruction of drain (RCC/Brick/Pipe) from Dhap 4 storied Mosque to Lakuthi more to Checkpost to Lalkuthi School.(Ch 0- 1133m.) c)Contruction of drain (RCC/Brick/Pipe) from Dhap Police Fari to Sena auditorium & link Ridom clinic & H/O Ratan.(Ch 0- 995 m.) 3.26 516.21 SA & ME (JV) 452.35 20/07/2017 19/07/2018 0 07/02/2019  
57 Pabna 49 ishwardi 374 291 RpCC2-20 a)Contruction of drain from Lalbag to Darshan more & Link Ch 0- 3.00 km. b)Contruction of drain (RCC/Brick/Pipe) from central Bus stand to Barobari hat road.( Ch 0- 4.0 km) 9.10 1234.85 Kobir Hossain 1100.65 11/04/2017 15/06/2018 0 07/02/2019  
58 Pabna 49 ishwardi 374 291 RpCC2-19 a) Contruction of drain (RCC/Brick/Pipe) beside Keranipara Kakina Kuthi road.(Ch 0- 815 m.) b) Contruction of drain (RCC/Brick/Pipe) from Burirhat road Pakar matha to East side of Shakati Bridge.(Ch 0- 589 m.) c) Contruction of drain (RCC/Brick/Pipe) from old Desh Clinic to Gonganath road.(Ch 0- 583 m.) 4.29 533.89 Khan &Sons and M/S enterprise Ltd Jv 485.02 11/03/2017 15/06/2018 0 07/02/2019  
59 Pabna 49 ishwardi 374 291 RpCC2-18 a) Contruction of drain (RCC/Brick/Pipe) from Textile more to Nisbetgonj Mosque Ghaghot River.( Ch 0-2800 m.) b) Contruction of drain (RCC/Brick/Pipe) from 2 no MP Checkpost to Misbetgonj road via H/O sujit.(Ch 0- 1200 m.) c) Contruction of drain (RCC/Brick/Pipe) beside Dewanbari road.(Ch 0- 2622 m.) 6.62 1282.85 Kobir Hossain 1163.64 11/03/2017 15/06/2018 0 07/02/2019  
60 Pabna 49 ishwardi 374 291 RpCC2-17 Contruction of drain (RCC/Brick/Pipe) from Central Bus Terminal to Ghaghot River.( Ch 0- 3170m) 3.17 869.70 Alamgir Jahan 790.06 30/03/2017 11/08/2018 0 07/02/2019  
61 Pabna 49 ishwardi 374 291 RpCC2-16 a) Contruction of drain (RCC/Brick/Pipe) from Kellabond Mosque to Uttam School via Juenalist Mounul Islam & link Shop of Azam. (Ch 0- 1633 m.) b) Contruction of drain (RCC/Brick/Pipe) from Hazipara more to BDR drain via ex Councillor Nur mohammad House & link Aftab School.( Ch 0- 1260m.) 4.17 542.02 Abul Hossain 503.28 30/03/2017 23/08/2018 0 07/02/2019  
62 Pabna 49 ishwardi 374 291 RpCC2-15 a) Contruction of drain (RCC/Brick/Pipe) from H/O Moti to Chowrapara Fuel Station to Kellabond Sluice Gate via CO bazar & Connecting Drain back side of Upazilla Office(Ch 0- 2160 m.) b) Contruction of drain (RCC/Brick/Pipe) from H/O ex Councillor Nurul Haque to BCIC road & beside BCIC road & Link.( Ch 0- 809 m.) 4.61 768.51 Khairul-Ujjal-Rej(JV) 701.35 03/04/2017 30/08/2018 0 07/02/2019  
63 Pabna 49 ishwardi 374 291 RpCC2-14 Construction of 25 m span Bridge over K.D canal at Angur Mia. 294.11 Alamgir Jahan 232.57 30/03/2017 09/08/2018 0 07/02/2019  
64 Pabna 49 ishwardi 374 291 RpCC2-12 a) Improvement of Charcit house road bylane Ch 0-647m. b) Improvement of road from Betpotty to kamarpara to Abohway office & Link. ch0.0-2900m c) Rehabilitation and widenning of Dhap old Desh Clinic to Gonganath road by BC. Ch 0-576m. d) Rehabilitation and widenning of Jummapara Fokir Mohammad road by BC. Ch 0-946m. e) Rehabilitation and widenning of Jummapara Mosque to Jummapara Pakar Matha road by BC. Ch 0-1080m. 8.03 421.23 Md. Ayub Hossain 334.47 26/09/2017 25/09/2018 0 07/02/2019  
65 Pabna 49 ishwardi 374 291 RpCC2-10 b)Improvement of road by BC from H/O azizer Driver to Shop of Babu. Ch 0- 827m. c)Improvement of Monoharpur road & bylane by BC. Ch 0- 1342m. d)Improvement of Darshan road bylane from Bothtola to Gofurer Bazzar to H/O Ashraf to H/O Mokhless Ch 0-3745m e)Rehabitation of Bhurarghat road by BC.Ch 0- 1778m. 7.69 691.68 SMAH-JC-GME(JV) 617.67 26/09/2017 25/09/2018 0 07/02/2019  
66 Pabna 49 ishwardi 374 291 RpCC2-09 a) Improvementt of benglar para road from chadcuty halipad up to benglar para.ch0-2.955km.b) Improvement of shahapara road from girls schoolmore up to chilmon H/O Anamul Islam & link Road. ch 0.0-1708m c)Improvement of Bara Bazar road & bylane.Ch 0- 2795.0 m 7.46 792.25 M.Shahjahan Ali 724.08 20/06/2017 19/06/2018 0 07/02/2019  
67 Pabna 49 ishwardi 374 291 RpCC2-08 a)Improvementt of road from Vatiatary road Mohabbat Kha Govt. Primary School to Fulamer more..Ch 0- 2174m b) Improvement of road from Uttamkuthi road Tapodhan UP road to Chilmon Chowrasta Bazar..Ch 0- 1166 m. c) Improvementtof road from Chandkuthi road to Hazir Bazar via Bodhukamla..Ch 0- 2741 m. d)Improvementt of road from Mohabbat kha School to Ful Amartol..Ch 0- 1675 m 7.76 872.03 M. Shajahan Ali 797.14 20/06/2017 19/06/2018 0 07/02/2019  
68 Pabna 49 ishwardi 374 291 RpCC2-07 a)Improvement of Chandkuthi road from H/O Bidhu master to shop of Lablu ch00.0-1105 & Chandkuthi halipad site Mohabbadkha H/O Advocate ch00.0-1564m b)Improvement of Topadhan UP road by lane Shakpara road Horirammol Boksha GPS ch00.00-2182.Topadhan Mobbatkha school shakpara ch00.0-1721m. Chowrahat shakpara ch00.0-1638m 8.21 967.90 M/S Shohid Brothers. 874.69 20/06/2017 29/07/2018 0 07/02/2019  
69 Pabna 49 ishwardi 374 291 RpCC2-06 Improvement of road by RCC from Harail to Burail. Ch 0- 1483m. 1.49 220.21 S.M Shafiqul Alam 163.12 20/07/2017 19/07/2018 0 07/02/2019  
70 Pabna 49 ishwardi 374 291 RpCC2-05 Improvement of road by BC from Benughat to 2 no ward Pucca road. Ch 0- 8247 m 8.25 1303.69 M/S Shohid Brothers 1163.15 24/06/2017 17/11/2018 0 07/02/2019  
71 Pabna 49 ishwardi 374 291 RpCC2-03 a)Improvement of road by BC from Burirhat road to Monohar road.Ch 0- 2.9 km. b)Improvementof road by BC from Burirhat road Kellbond Kachari to H/O Azizer.Ch 0- 1.3 km. c)Improvement of road by BC from Bala Komor Saraker par to Kaiagoli School more. Ch 0- 1.90 km. d)Improvement of road By Muktizandha H/O Abdul Gofur to Barogharia Dakhil Madrasha. e)Improvement of road By Burirhat Muntu Mill Bazzar to Goalu H/O Kader Chairman . f)Improvement of road Rangpur-Dinajpur road to Uttam East para Baytul Aman Jame Mosque. g)Improvement of road Madha Oviram H/O Jamal to Oviram Central Jame Mosque. 11.71 1303.68 Rafiq constructionco(pvt)Ltd-Ujjal Kumar Dey 1204.58 28/02/2018 10/03/2019 0 07/02/2019  
72 Pabna 49 ishwardi 374 291 RpCC2-01 a) Improvementof road By BC from Ranachandi Sheikhpara to Hazir Hat. Ch 0- 1602m, link-1 ch0.0-956m & link-2 ch0.0-653m b) Improvementof road by BC from South side of Uttam Boshunia Jame Mosque to H/O Alam to Bashunia para 2nd Jame Mosque to H/O Nurul Hazi to H/O yasin.Ch 0- 939m. d) Rehabilitation of kutir para road from G.L roy road to Mondal para road.ch.00-905m, link-1 ch00.0-490m. e) Rehabilition of gorapir mazar road to Robertsongong(IRP) choo-1041m, link-1 352m. f)Rehabilitation of Mouvhasa (Mobaser) road. ch0.0-1342 m, link-1 ch.00-674m , link-2 ch.00-297m. g)Improvement of road Moladevpur to robertsongong connection road ch.o-698m 10.30 837.95 Md. Khairul Kabir Rana 896.39 10/10/2017 10/09/2018 0 07/02/2019