1
|
Barguna
|
2
|
betagi
|
2
|
824
|
UIIP/PCO/G-33
|
Implementation & Supply 439 nos Waste Basket (120 ltr) & 30 nos Non-motorized vehicle (van) under Betagi Pourashava District: Barguna.
|
|
|
|
1.00
|
39.98
|
RFL Plastrics Limited
|
26.60
|
|
|
|
50
|
|
|
07/10/2024
|
|
2
|
Barguna
|
2
|
betagi
|
2
|
824
|
UIIP-BC/PCO/W-305
|
Construction of one Storied Vegetable & Agricultural Products Market on 3-Storied Foundation (Floor Area= 270.00 sqm) under Betagi Pourashava, Barguna.
|
|
|
|
1.00
|
149.90
|
M/S Shikder Construction
|
149.75
|
20/09/2023
|
20/09/2023
|
19/09/2024
|
75
|
60.69
|
41
|
07/10/2024
|
|
3
|
Barguna
|
2
|
betagi
|
2
|
824
|
UIIP-BC/PCO/W-550
|
A) Construction of RCC Road from Madrasha BC road to Al-Amin Mollik Home Ch.0.00m-100.00m and in front of Jalil Mollik Home Ch:0.00-70.00m at ward no.08 Under Betagi Pourashava, Barguna. (Salvage Amount-16,743.00)
B) Construction of RCC Road from RHD road to Dhali Khanda road via Panna Home Ch.0.00-371.00m at ward no.03 under Betagi Pourashava, Barguna. (Salvage Amount-31,176.00)
C) Construction of RCC Road from Wapda raod to Nondi Bari Ch.0.00-134.00m at Ward No.-06 Under Betagi Pourashava, Barguna. (Salvage Amount-9237.00)
|
|
0.68
|
|
|
94.71
|
M/S Subama Enterprise
|
94.38
|
26/07/2023
|
26/07/2023
|
25/07/2024
|
100
|
80.82
|
86
|
07/10/2024
|
|
4
|
Barguna
|
2
|
betagi
|
2
|
824
|
UIIP-BC/PCO/W-549
|
A) Construction of RCC Road with 04 nos U-drain from Khalil Contractor Home to Masud Prof. Home via Moti Khan Home (Ch:0.00-316.00m) at ward no.08 under Betagi Pourashava, Barguna. (Salvage Amount-10,603.00) B) Construction of RCC Road from Madrasha BC road to Nasir Uddin Pijus Home Ch:0.00-175.00m at ward no.08 Under Betagi Pourashava, Barguna. (Salvage Amount-12,701.00)
|
|
0.49
|
|
|
84.11
|
M/S Anfa Enterprise
|
83.89
|
26/07/2023
|
26/07/2023
|
25/07/2024
|
100
|
64.65
|
77
|
07/10/2024
|
|
5
|
Barguna
|
2
|
betagi
|
2
|
824
|
UIIP-BC/PCO/W-548
|
A) Construction of RCC Road from Mridha Bari to Khalpar (Ch.0.00-260.00m) at Ward no-04 Under Betagi Pourashava, Barguna. (Salvage Amount-74,988.00)B) Construction of RCC Road with one no. U-Drain from Habib Councillor Home to Alam Councillor Home (Ch.0.00-188.00m) & both side of box Culvert (Ch.188.00-210.00=22.00m) at ward no.03. Under Betagi Pourashava, Barguna. (Salvage Amount-24,773.00)
|
|
0.47
|
|
|
77.34
|
M/S Al-Amin Enterprise
|
77.18
|
26/07/2023
|
26/07/2023
|
25/07/2024
|
100
|
77.13
|
100
|
07/10/2024
|
|
6
|
Barguna
|
2
|
betagi
|
2
|
824
|
UIIP-BC/PCO/W-537
|
A) Construction of One no. Shed for Public Transport Passenger (28.00sqm) at Lanch Ghat at Ward No.07, Under Betagi Pourashava, Dist: Barguna. B) Construction of One Storied Public Toilet (Type A=56.00sqm) at Lanch Ghat at ward No.-07 Under Betagi Pourashava, Dist: Barguna.
|
|
|
|
2.00
|
47.33
|
M/S Al-Amin Enterprise
|
47.23
|
19/09/2022
|
19/09/2022
|
18/09/2023
|
100
|
47.10
|
100
|
07/10/2024
|
|
7
|
Barguna
|
2
|
betagi
|
2
|
824
|
UIIP-BC/PCO/W-39
|
Construction of RCC road from Daser Bridge to RCC road via Akon Bari & Wazed commander home at ward no.02 & 03.Ch. 00.00m-1073.00m.
|
|
1.07
|
0.00
|
0.00
|
93.06
|
M/S Khan Enterprise
|
92.96
|
09/08/2020
|
16/08/2020
|
15/08/2020
|
100
|
92.96
|
100
|
29/09/2022
|
|
8
|
Barguna
|
2
|
betagi
|
2
|
824
|
UIIP-BC/PCO/W-406
|
A) Construction of RCC Drain from (i) Natun Dack Bangla to Khal (Ch:0.00-125.00m) ward no. 06 (ii) Old Drain to Govt Collage (Ch:0.00-150.00m) ward no 05 (iii) Montu Khan’s House to Khal par (Ch:0.00-150.00m) word no 06 Under Betagi Pourashava District: Barguna.
B) Construction of RCC Drain from (i) RCC Road to boro Khal via Paltu Comisoner Home (Ch 0.00-40.00m) word no 07 (ii) RCC Road to boro Khal via Babul Kazi Home Ch. 0.00-36.00mm word no 07 (iii) Sankor Home to Hospital Gate (Ch. 0.00-170.00m) word no 07 (iv) Nazmul Huda home to boro Khal (Ch. 0.00-250.00m) word no 05 (v) Sabdar Chand Munsir Mazar to Faysal Home (Ch.0.00-168.00m) word no 08 (vi) RCC Road to baro Khal via Manik Roy Home (Ch. 0.00-250.00m) word no. 07 Under Betagi Pourashava District: Barguna.
|
|
|
0.00
|
0.00
|
171.70
|
M/S Khan Entr.
|
171.69
|
09/11/2021
|
|
08/11/2022
|
100
|
171.69
|
100
|
29/09/2022
|
|
9
|
Barguna
|
2
|
betagi
|
2
|
824
|
UIIP-BC/PCO/W-405
|
A) Construction of 01 No. 1-Vent Culvert size (3.00X3.00)m of Bapari Bari fornt site word no. 03 Under Betagi Pourashava District: Barguna.
B) Construction of 01 No. 1-Vent Culvert size (3.00X3.00)m of Samsul Islam Doctor Bari fornt site word no. 09 Under Betagi Pourashava District: Barguna.
C) Construction of 01 No. 1-Vent Culvert size (2.00X2.00)m of Sharif Bari fornt site word no. 02 Under Betagi Pourashava District: Barguna.
D) Construction of 01 No.1-Vent Culvert size (2.00X2.00)m of Prashanda's Danga word no 03 Under Betagi Pourashava District: Barguna.
E) Construction of 01 No. 1-Vent Culvert size (3.00x3.00)m of Habib Comisonar House Khal fornt site word no. 03 Under Betagi Pourashava District: Barguan.
F) Construction of 01 No. 1-Vent size (2.00x2.00)m of Dilip House fornt site word no. 02 Under Betagi Pourashava District: Barguna.
|
|
|
14.00
|
0.00
|
79.07
|
M/S Hakkanur Entr.
|
79.00
|
11/09/2021
|
|
11/08/2022
|
100
|
79.00
|
100
|
29/09/2022
|
|
10
|
Barguna
|
2
|
betagi
|
2
|
824
|
UIIP-BC/PCO/W-404
|
A) Construction of RCC Road with Guide wall from Upazila Parished Gate to South Side Upazila Parished Complex (Ch:0.00-124.00m) all side of Upazila Parished Pond (Ch:0.00-360.00m) Upazila Parished to KG School Via DPHE Office (Ch:0.00-260.00m) at ward No.07 (B) Salamer Barir Culvert to Betagi-Niamoti road (Ch:0.00-176.00m) at ward No.03 under Betagi Pourashava District : Barguna Total Length=920m.
|
|
0.92
|
0.00
|
0.00
|
129.48
|
M/S Shikder Enterprise
|
129.31
|
17/05/2022
|
|
16/05/2023
|
32
|
0.00
|
0
|
29/09/2022
|
|
11
|
Barguna
|
2
|
betagi
|
2
|
824
|
UIIP-BC/PCO/W-201
|
A Construction of RCC road form Betagi Niamoti Highway Road to Dafi Howlader Bari via Purbo Betagi Primary School Ch 00.00-518.40 m at Ward no2. Under Betagi Pourashava.
B Construction of RCC road form by pass road to Upazila chairman bari Ch 00.00-180.0 m at Ward no9 Under Betagi Pourashava
C Construction of RCC work for Khas Kachari Math of Agriculture & Product Market Length-32.00m B-15.00m at ward No. 07 Under Betagi Pourashava.
|
|
0.73
|
0.00
|
0.00
|
81.24
|
M/S Khan Enterprise
|
81.06
|
22/10/2020
|
|
28/10/2021
|
100
|
81.02
|
100
|
29/09/2022
|
|
12
|
Barguna
|
2
|
betagi
|
2
|
824
|
UIIP-BC/PCO/W-200
|
A Construction of RCC Drain from Captain Selim home to Jelepara Mondir via Govt College to Manik Khan home Ch. 00.00-410.00mat ward No. 05. Under Betagi Pourashava Barguna and ii. Construction of RCC Drain in front of Babul Mia home and kacha bazar to Madrasha Ch 00.00-190.00 m at Ward no 08. Under Betagi Pourashava Barguna B Construction of RCC road from College Pond to Humayun Professor via College Mosque 220.00m Betagi-Patuakhali road to Sayed Jakir home 60.00m College road to Harun Fakir home 75.00m at ward no.05 & 1 No. Ward Carpeting road to Tota Member home 200.00m at ward no. 01 Under Betagi Pourashava Barguna.
|
|
1.15
|
0.00
|
0.00
|
122.33
|
M/S Shikder Enterprise
|
122.09
|
22/10/2020
|
|
28/10/2021
|
100
|
122.07
|
100
|
29/09/2022
|
|
13
|
Barguna
|
2
|
betagi
|
2
|
824
|
UIIP-BC/PCO/W-199
|
i. Construction of RCC road form Mahasarak to Baro Khal via Mridha Bari Ch 00.00-250.00m at Ward no:4,
ii. Construction of RCC road form Food Godown with palasiding (Ch. 90.00-250.00m ) to Mahamudar Gola Via Khal Par 00.00-300.00m at Ward no:1. Under Betagi Pourashava,
iii. Construction of RCC road form Hijoltala Primary School to Joynal Fakir home Ch 00.00-100.00m at Ward no:3 Under Betagi Pourashava, Barguna and
iv. Construction of RCC road with side Guide Wall form Upazila Quqrter to WAPDA road via Muslim Koloni Ch 00.00-192.00 m at Ward no: 08 Under Betagi Pourashava, Barguna
|
|
0.84
|
0.00
|
0.00
|
85.29
|
M/S Hakkanur Enterprise
|
85.10
|
25/10/2020
|
01/11/2020
|
24/10/2021
|
100
|
85.10
|
99
|
29/09/2022
|
|
14
|
Barguna
|
2
|
betagi
|
2
|
824
|
UIIP-BC/PCO/W-42
|
A Construction of RCC road form Mahamudar gola to Hafizia Madrasha Ch 00.00-620.0 m at Ward no1
B Construction of RCC road with side Guide Wall Ch. 00.00-35.00m form Rafil Haji bari to Montu commissioner bari via Juwel and Sabina Yeasmin Doly Home Ch. 00.00-275.00m and Biswas bari to Habib commissioner home Ch 00.00-200.0m Total 475.00m at Ward no 03.
|
|
1.10
|
0.00
|
0.00
|
96.83
|
M/S Shikder Enterprise
|
96.77
|
09/08/2020
|
16/08/2020
|
15/08/2020
|
100
|
96.77
|
100
|
29/09/2022
|
|
15
|
Barguna
|
2
|
betagi
|
2
|
824
|
UIIP-BC/PCO/W-41
|
Construction of RCC road form Basonda Govt. Primary School to Carpating Road Via Dali kandha Pul Ch 00-1132 at Ward no3.
|
|
1.13
|
0.00
|
0.00
|
98.17
|
M/S Khan Enterprise
|
98.13
|
09/08/2020
|
16/08/2020
|
15/08/2020
|
100
|
98.13
|
100
|
29/09/2022
|
|
16
|
Barguna
|
2
|
betagi
|
2
|
824
|
UIIP-BC/PCO/W-40
|
A. Construction of RCC road with road side Guide Wall form Baily Bridge to By pass Road Via Goni Howlader Bari Ch 00-627 at Ward no 9
B. Construction of RCC road with side Guide Wall Ch. 302.00-332.00m form Baro khaler par to WAPDA road via Mazibar Howlader bari Ch 00.00-332.0 m at Ward no8.
|
|
0.99
|
0.00
|
0.00
|
86.34
|
M/S Khan Enterprise
|
86.25
|
09/08/2020
|
16/08/2020
|
15/08/2020
|
100
|
86.25
|
100
|
29/09/2022
|
|
17
|
Barishal
|
5
|
bakerganj
|
27
|
824
|
UIIP/PCO/G-34
|
Implementation & Supply 765 nos Waste Basket (120 ltr) & 10 nos Non-motorized vehicle (van) under Bakerganj Pourashava District: Barishal.
|
|
|
|
1.00
|
39.97
|
RFL Plastrics Limited
|
27.60
|
|
|
|
10
|
|
|
07/10/2024
|
|
18
|
Barishal
|
5
|
bakerganj
|
27
|
824
|
UIIP-BC/PCO/W-551
|
A) Construction of RCC Road from Sadar road to Betagi Road (Ch: 0.00-62.00m) Under R&H Bridge at ward No.-02, Under Bakerganj Paurashava.
B) Construction of RCC road from Aga baker road to Bongobondhu Road (Ch:0.00-156.00m) Under R&H bridge Bank of Srimonto River at ward No.-08, Under Bakerganj Paurashava.
C) Construction of RCC road from Sahebganj road to Sabujbag road west side of twin quarter (Ch: 0.00 -157.00m & Link 7m+7m=14m, Total Length=171m) at ward no 05, Under Bakerganj Paurashava
D) Construction of Rustum ali road by RCC from R&H road to T&T road, Ch:0.00-122.00m at ward No.- 04, Under Bakerganj Paurashava
E) Construction of RCC road from aga baker khan link road to aga baker khan road west side of Pourashava road (Ch:0.00-119.00m) at ward no. 04, Under Bakerganj Paurashava
Construction of RCC road from Talukder bari road to Mollik bari road (Brave Freedom Fighter Abdus Sobhan Mallik Road) (Maim Road Ch: 0.00-120.00m & Link-01=20m, Link-02=80m, Link-03=15m) at ward no 09, Under Bakerganj Paurashva
G) Construction of aga baker khan Main Road by RCC (Ch:0.00-51.00=51m) from T&T Road to R&H road at ward No. 04, Under Bakerganj Paurashava. (Dropped)
|
|
0.88
|
|
|
145.86
|
M/S Enterprise
|
143.47
|
03/06/2023
|
03/07/2023
|
02/06/2024
|
100
|
122.18
|
85
|
07/10/2024
|
|
19
|
Barishal
|
5
|
bakerganj
|
27
|
824
|
UIIP-BC/PCO/W-520
|
A) Construction of Shed for Public Transport Passenger (28.00sqm) Beside R&H Road Connecting point on Bus stand at ward No.01 Under Bakerganj Pourashava.
B) Construction of One Storied Public Toilet (Type A=56.00sqm) Beside R&H Road & Jelkhana Khal at ward No.02 Under Bakerganj Pourashava.
|
|
|
|
2.00
|
47.11
|
M/S Enterprise
|
51.51
|
12/09/2022
|
19/09/2022
|
11/09/2023
|
97
|
44.94
|
87
|
07/10/2024
|
|
20
|
Barishal
|
5
|
bakerganj
|
27
|
824
|
UIIP-BC/PCO/W-293
|
A construction of Single Vent RCC 3.00 x 3.00 Box Culvert in khal from R H road to North Azimpur Kshashem Mazi Bari Road. Ward No-07. Under Bakerganj Pourashava
B. construction of Single Vent RCC 2.00x2.00 Box Culvert In khal side of Runshi road to West side of Kalam Councilors house. Ward No-O1. Under Bakerganj Pourashava
C. construction of Single Vent RCC 2.00x2.00Box Culvert in Varani Khal West side of Bari market. Ward No-OS. Under BakerganjPourashava
D. construction of Single Vent RCC 2.00x2.00Box Culvert in Khal Padma Dighivarry road . Ward No-06. Under Bakerganj Pourashava.
E. construction of Single Vent RCC 2.00x2.00 Box Culvert in Khal Runshiivarry road to Shampurgami road in front of Unus Hawladers house Ward No-01. Under Bakerganj Pourashava.
F construction of Single Vent RCC 2.00x2.00 Box Culvert in Khal Ruhiter par road towards South in front of Akkas Gazi House Ward No-09. Under Bakerganj Pourashava.
|
|
|
13.00
|
0.00
|
76.70
|
M/S Jamal Sarder
|
76.68
|
01/08/2021
|
01/08/2021
|
31/07/2022
|
100
|
72.87
|
95
|
29/09/2022
|
|
21
|
Barishal
|
5
|
bakerganj
|
27
|
824
|
UIIP-BC/PCO/W-292
|
A. Construction of RCC Drain from West side of Rony house to R and H ditch Ward 0 I. Under Bakerganj Pourashava. ChO.00-153.00m 153.00m.
B. Construction of RCC Drain from Skin Mridha shop to Thana more Chourasta existing RCC Drain Ch 00-98.00m D I from West side of Skin Mridha shop to Tulatoli River. Ch 00-122.00m D2 from Skin Mridha house to proposed D2 drain Ch 00-92m92m D3.At ward No-03. Under Bakerganj Pourashava
C. Construction of RCC Drain from Emdad Khandoker house to R and Khal. At Ward No-07. Under Bakerganj Pourashava.ChOO- 107m.
D. Construction of RCC Drain from Md. Kalarn house to Sreemonto river East side of Madrasha Road and West side of Girls School at ward No-05. Under Bakerganj Pourashava. D I ChOO-285m. D2 ChOO-60m.
|
|
|
0.00
|
0.00
|
136.59
|
M/S Muhib Construction
|
139.35
|
01/08/2021
|
01/08/2021
|
31/07/2022
|
100
|
114.05
|
82
|
29/09/2022
|
|
22
|
Barishal
|
5
|
bakerganj
|
27
|
824
|
UIIP-BC/PCO/W-291
|
A Construction of RCC Road from high School road to Primary School and JSU High School.Bakerganj Pourashava.Ward No-04. Under Bakerganj Pourashava B Construction of RCC Road fromR & H road to M. Rahman Sarok. North side of Muzahidia Madrasha Ward No- 02. Under Bakerganj Pourashava. ChOOm-266m266m. C Construction of RCC Road from Sadar road to Ripon Councilors house. Ward No-02. Under Bakerganj Pourashava. ChOOm-244m.D Construction of RCC Road from Sadar road to Tulatoli River & house of ton Chakraborti twowards West. Ward No- 02. Under Bakerganj Pourashava. ChOOm 153m .Link30m
|
|
1.03
|
0.00
|
0.00
|
121.91
|
S/M Enterprise
|
121.86
|
01/08/2021
|
01/08/2021
|
31/07/2022
|
100
|
104.79
|
86
|
29/09/2022
|
|
23
|
Barishal
|
5
|
bakerganj
|
27
|
824
|
UIIP-BC/PCO/W-161
|
A Construction of RCC Road from Bakerganj Betagi Road to Runshi varry Road West side of Kundo Bari towards North ChO.OO-480m480m Ward No-01. Under Bakerganj Pourashava
B Construction of RCC Road from Bakerganj Betagi Road to Runshi varry Road infront of Kalarn Councilor house toward west ChO.OO-165m165m. Ward no 01. Under Bakerganj Pourashava
C Construction of Graveyard Road by RCC Ch 199-326 m. At ward No 07.Under Bakerganj Pourashava.
|
|
0.77
|
0.00
|
0.00
|
95.37
|
M/S Muhib Construction
|
95.31
|
01/11/2020
|
08/11/2020
|
30/10/2021
|
100
|
94.45
|
100
|
29/09/2022
|
|
24
|
Barishal
|
5
|
bakerganj
|
27
|
824
|
UIIP-BC/PCO/W-160
|
Construction of RCC Road from Akon Bari Road to Talukder Bari Road. Ch0.00-590.00m590.00m and Link Akon 3ari Mosque Ch 0.00-90.00 m. Total Length 680m Ward no- 09.Under Bakerganj Pourashava.
|
|
0.68
|
0.00
|
0.00
|
84.68
|
S/M Enterprise
|
84.68
|
01/11/2020
|
08/11/2020
|
30/10/2021
|
100
|
84.66
|
100
|
29/09/2022
|
|
25
|
Barishal
|
5
|
bakerganj
|
27
|
824
|
UIIP-BC/PCO/W-159
|
Construction of RCC Drain left side of B.I.P Road from Bakerganj Betagi road to Khalifa Bari Khal ChOO.OOm to 510m.Ward No-O1.Under Bakerganj Pourashava and Agabaker Road to High School Road ChOO.OOm to 60m.Ward no- 04Under Bakerganj Pourahava.
|
|
|
0.00
|
0.00
|
89.11
|
S/M Enterprise
|
89.00
|
01/11/2020
|
08/11/2020
|
30/10/2021
|
100
|
88.94
|
100
|
29/09/2022
|
|
26
|
Barishal
|
5
|
bakerganj
|
27
|
824
|
UIIP-BC/PCO/W-126
|
Construction of R.C.C road from Sree dhanto bariroad to Atharogasiagami road via Nagor Mollah house.Ward No-0809. Under Bakerganj Pourashava.Ch 00 m- 885 m
|
|
0.89
|
0.00
|
0.00
|
99.93
|
M/S Muhib Construction
|
99.93
|
06/10/2020
|
|
15/10/2021
|
100
|
99.91
|
100
|
29/09/2022
|
|
27
|
Barishal
|
5
|
bakerganj
|
27
|
824
|
UIIP-BC/PCO/W-125
|
Estimate for RCC road of Post Office road to Varani Khal.LGED Approch and Hospital Ch00m-310m and Post Office road to LGED Bridge Approch towards North- East Ch00-240 m.Ward No-05. Under Bakerganj Pourashava.
Estimate for Construction of R.C.C road from Bakerganj Betagi road to B.I.P road North Side of Miraz House.Ch 00m to 362 m. Ward No-01.Under Bakerganj Pourashava.
|
|
0.60
|
0.00
|
0.00
|
109.23
|
M/S Muhib Construction
|
109.22
|
04/10/2020
|
|
15/10/2021
|
100
|
109.14
|
100
|
29/09/2022
|
|
28
|
Barishal
|
5
|
bakerganj
|
27
|
824
|
UIIP-BC/PCO/W-124
|
Construction of B.C road from Ruhiterpar R & H to Padma Dighi via Fiha Bricks.Ward No-06. Under Bakerganj Pourashava.Ch 00m - 682m.
construction of BC road from R & H road to Hasan Mekar house. Ward No-01. Under Bakerganj Pourashava. Ch00m to ch320 m.
|
|
1.00
|
0.00
|
0.00
|
90.17
|
M/S T M Enterprise
|
90.17
|
04/10/2020
|
|
15/10/2022
|
100
|
89.01
|
99
|
29/09/2022
|
|
29
|
Barishal
|
5
|
bakerganj
|
27
|
824
|
UIIP-BC/PCO/W-123
|
Construction of R.C.C. road from Bakerganj Betagi road to Baroi Bari Bridge infront of B.I.P. Colony.Ward No-01.Under Bakerganj Pourashava.Ch00.00-885.00m.
Estimate for Construction of B.C road from Shahebganj road to Shahebganj West Side of Tween Quarter. Ch157-257.00 m100.00 m. Ward no-05.Under Bakerganj Pourashava
|
|
0.99
|
0.00
|
0.00
|
91.15
|
M/S Muhib Construction
|
91.14
|
06/10/2020
|
|
15/10/2021
|
100
|
91.01
|
100
|
29/09/2022
|
|
30
|
Barishal
|
5
|
gouranadi
|
22
|
824
|
UIIP/PCO/G-35
|
Implementation & Supply 602 nos Waste Basket (120 ltr) & 20 nos Non-motorized vehicle (van) under Gournadi Pourashava District: Barishal.
|
|
|
|
1.00
|
39.98
|
RFL Plastrics Limited
|
29.99
|
03/04/2024
|
03/04/2024
|
02/07/2024
|
0
|
0.00
|
0
|
07/10/2024
|
|
31
|
Barishal
|
5
|
gouranadi
|
22
|
824
|
UIIP-BC/PCO/W-553
|
A) Improvement of Road from Goat Market Road to Torki Bondor Mutual Trust Bank via Torki High School (Ch. 22.00 to 280.00m) by RCC with a Cross Drain at Ward no. 01, under Gournadi Pourashava, Barishal.
B) Improvement of Road from Sawra Shahjahan Howlader House to Sawra Govt. Primary School (Ch 0.00m to 146m) by RCC and One Road cross Drain at Ch.3.00m, Ward No. 06, Gournadi Pourashava, District : Barishal.
C) Improvement of BC Road from Hizoltala Paik Bari to Bokultala Road (Ch:174-318m) by Bituminous Dense Carpeting (DC) at Ward No:06 under Gournadi Pourashava, District: Barishal
|
|
0.54
|
|
|
75.88
|
M/S Howleder enterprise
|
75.86
|
28/05/2023
|
28/05/2023
|
27/05/2024
|
99
|
216.31
|
85
|
07/10/2024
|
|
32
|
Barishal
|
5
|
gouranadi
|
22
|
824
|
UIIP-BC/PCO/W-518
|
A) Construction of One Storied Public Toilet (Type A=56.00sqm) at ward No.06 Under Gournadi Pourashava, Dist: Barishal
B)Construction of Shed for Public Transport Passenger (28.00sqm) at ward No.06 Under Gournadi Pourashava, Dist: Barishal.
|
|
|
0.00
|
2.00
|
49.90
|
M/S Howleder enterprise
|
49.89
|
03/07/2022
|
10/07/2022
|
29/02/2024
|
100
|
48.80
|
100
|
07/10/2024
|
|
33
|
Barishal
|
5
|
gouranadi
|
22
|
824
|
UIIP-BC/PCO/W-494
|
A) Construction of Single Vent (2.00x2.00m) RCC Box Culvert at Ashokati-Gerakul Road infront of Paik Bari Ward No.08 Under Gournadi Pourashava Dist: Barishal.
B) Construction of Single Vent (2.00x2.60m) RCC Box Culvert at Torkir Char Kashir Mistir Dokan Ward No.02 Under Gournadi Pourashava Dist: Barishal.
C) Construction of Single Vent (4.30x4.30m) RCC Box Culvert Over Khal at Torki Vozon Kundu Oil Mil Ward No.02 Under Gournadi Pourashava Dist: Barishal.
D) Construction of Single Vent (3.00x3.00m) RCC Box Culvert Over Cannel infront of Torki Omor Roy House Ward No.01 Under Gournadi Pourashava Dist: Barishal.
E) Construction of Single Vent (1.30x1.30m) RCC Box Culvert Over Cannel infront of Diashur Chowkider House Road Ward No.08 Under Gournadi Pourashava Dist: Barishal.
|
|
|
14.76
|
0.00
|
85.00
|
M/S Howleder enterprise
|
84.98
|
06/06/2022
|
09/06/2022
|
05/06/2023
|
100
|
83.86
|
100
|
07/10/2024
|
|
34
|
Barishal
|
5
|
gouranadi
|
22
|
824
|
UIIP-BC/PCO/W-493
|
A (i) Construciton of RCC Drain from Gournadi-Sarikal GC road North Side of Khan Shoping to via Bhuiya Store to Birendash store to Gournadi river (Ch: 0.00-195m D1) (ii) Ice factory to Shathi Garments (Ch: 0.00-95m D2) (iii) Birendash Store to Sochin Gosh Sweet factory near cannel (Ch: 0.00-95 D3) (iv) Shathi Garments to front of Registry Office (Ch: 0.00-85m D4) (v) Bhuiya Store to Gournadi Cannel ( Ch: 0.00-35m D5) Ward No. 05 Under Gournadi Pourashava Dist: Barishal.
B(i) Construciton of RCC Drain Torki Bandor Liton khan store to near by Sheraz Member shop cannel (Ch: 0.00-275m D1) (ii) Torki Bandor High School gate to Fish Market South Corner (Ch: 0.00-155m D2) (iii) Bagdad Hotel near by pond to south side of fish market Main drain (Ch: 0.00-100 D3) (iv) Torki Bandor Mosque to South side main drain (Ch: 0.00-60 D4) at ward No. 01 Under Gournadi Pourashava Dist: Barishal.
C (i) Construciton of RCC Drain from Gournadi - Sorikal GC road North side Karim Professor House to Chargadhatali Baitul Noor Mosque (Ch: 0.00-230m D1) (ii) Banker Akbar House to Baitul Noor Masque Main Drain (Ch: 0.00-120m D2) (iii) Baizid Akon House to Ekram Professor House near main Drain (Ch: 4.00-36m D3) (iv) X-Drain Near By Ekram Professor House (Ch: 0.00-04m) Ward No. 05 Under Gournadi Pourashava Dist: Barishal.
|
|
|
0.00
|
0.00
|
231.90
|
M/S Howleder enterprise
|
231.90
|
06/06/2022
|
09/06/2022
|
31/08/2024
|
98
|
218.51
|
94
|
07/10/2024
|
|
35
|
Barishal
|
5
|
gouranadi
|
22
|
824
|
UIIP-BC/PCO/W-492
|
A) Repairing of BC road from Diasur Joshim Shop to Banglabazer road (Ch: 0.00m to 766m) by Bituminus Dense Carpeting (DC) Under Gournadi Pourashava District: Barishal
B) Repairing of BC road from Gerakul Govt. Primary School to Dulal Khan Shop (Ch: 0.00m to 1160.00m) by Bituminus Dense Carpeting (DC) and Three U-drain at Ch. 296m 533m 722m ward No.08 Under Gournadi Pourashava District: Barishal
C) Construction of RCC road from Diasur kobiraj House to Alamin Howlader House(Ch: 0.00m to 190m) via Shohid Gazi House (Ch: 176.00m to 236m) Under Gournadi Pourashava District: Barishal
D) Construction and Installing Palisading for road side development at Pourashava road Tikasar Mintu Howlader House adjacent Pond (201m) by Masonry Brick work and Pre-Cast RCC Post Palisading ward No.05 under Gournadi Pourashava District : Barishal.
|
|
2.28
|
0.00
|
0.00
|
115.13
|
M/S Howleder enterprise
|
115.11
|
23/05/2022
|
30/05/2022
|
22/05/2023
|
100
|
114.63
|
100
|
07/10/2024
|
|
36
|
Barishal
|
5
|
gouranadi
|
22
|
824
|
UIIP-BC/PCO/W-491
|
A) Improvement of road from Madbor Bari Jame-Mosque to Bangla Bazar road (Ch: 0.00m to 518m) by Bituminous Dense Carpeting (DC) with three U-Drain at Ch:100m 196m 350m of Gournadi Pourashava District : Barishal.
B) Rehabilitation of BC road South Bijoypur Mamun Furniture to R&H road (Ch: 0.00m to 566m) by Bituminous Dense Carpeting (DC) Gournadi Pourashava District : Barishal.
C) Construction of RCC road from Food Godown to Fish Market Bridge (Ch: 0.00m to 135m) Under Gournadi Pourashava District: Barishal
D) Repairing of BC road from Gournadi Thanar More to ASP Office Via Rob CEO House (Ch: 0.00m to 330m) by Bituminus Dense Carpeting (DC) Under Gournadi Pourashava District: Barishal
|
|
1.55
|
0.00
|
0.00
|
91.59
|
M/S Howleder enterprise
|
91.58
|
23/05/2022
|
30/05/2022
|
22/05/2023
|
100
|
90.02
|
100
|
07/10/2024
|
|
37
|
Barishal
|
5
|
gouranadi
|
22
|
824
|
UIIP-BC/PCO/W-233
|
(a) Improvement of road from Tikashar Khan Bari Mosque to Upazila Dormetory (Ch 0.00m to 391m) by Bituminous Dense Carpeting (DC), Gournadi Pourashava, District : Barishal.
(b) Repairing of BC road from Gournadi Upazila Gate to Gournadi Bazar via Azad Professor House (Ch 0.00m to 673m) by Bituminous Dense Carpeting (DC), Gournadi Pourashava, District : Barishal.
(c) Rehabilitation of BC road from Upazilla Public Health Office to Dewan Bari (Ch 0.00m to 240m) by Bituminous Dense Carpeting (DC), Gournadi Pourashava, District : Barishal.
(e) Rehabilitation of BC road from Hizoltala Paik Bari road to Bokultala road (Ch 0.00m to 318m) by Bituminous Dense Carpeting (DC), Gournadi Pourashava, District : Barishal
|
|
1.50
|
0.00
|
0.00
|
158.69
|
M/S Howleder Enterprise
|
70.27
|
24/11/2020
|
01/12/2020
|
30/06/2022
|
100
|
70.27
|
100
|
07/10/2024
|
|
38
|
Barishal
|
5
|
gouranadi
|
22
|
824
|
UIIP-BC/PCO/W-136
|
(A) Improvement of road from Torki Omor Roy House Bridge to Profullo Chokroborti House Ch 0.00m to 775m by Bituminous Dense Carpeting DC Gournadi Pourashava District Barishal.
(B) Rehabilitation of BC road from Torki High School to Kali Khola ch 0.00m to 450m by Bituminous Dense Carpeting DC with Three U-Drain Under Gournadi Pourashava District Barishal.
(C) Improvement of road from Sundardi Abdul Mozid Pre-Cadet School to Md. Alomgir Shikder house Ch 0.00m to 558m by Bituminous Dense Carpeting DC Gournadi Pourashava District Barishal.
(D) Rehabilitation of BC road from Torki Bandor Goat Market to Anondopur Bridge Ch 0.00m to1328m by Bituminous Dense Carpeting DC Gournadi Pourashava District Barishal.
|
|
3.11
|
0.00
|
0.00
|
161.73
|
M/S Howleder enterprise
|
155.88
|
27/10/2020
|
03/11/2020
|
30/06/2022
|
100
|
155.71
|
100
|
07/10/2024
|
|
39
|
Barishal
|
5
|
gouranadi
|
22
|
824
|
UIIP-BC/PCO/W-234
|
(a) Improvement of road from Ashokathi Bazar to Rasel Councilor House (Ch 0.00m to 510m) by Bituminous Dense Carpeting (DC), Gournadi Pourashava, District : Barishal
(b) Repairing of BC road from Ashokathi Kacha Bazar to Gerakul Joshim's Shop (Ch 0.00m to 1470m) by Bituminous Dense Carpeting (DC), Gournadi Pourashava, District : Barisha
(c) Rehabilitation of BC road from Ashokathi Filling Station to Gerakul Govt. Primary School (Ch 0.00m to 1315m) by Bituminous Dense Carpeting (DC), Gournadi Pourashava, District : Barishal
|
|
3.30
|
0.00
|
0.00
|
128.15
|
M/S Howleder Enterprise
|
127.67
|
24/11/2020
|
01/12/2020
|
30/06/2022
|
100
|
66.14
|
52
|
29/09/2022
|
|
40
|
Barishal
|
5
|
gouranadi
|
22
|
824
|
UIIP-BC/PCO/W-137
|
(A) Improvement of road from Boro Kasba R&H to West side of Allah Mosque via Ex-Counsilor Alebali House Ch 0.00m to 480m by Bituminous Dense Carpeting DC with One U-Drain Gournadi Pourashava District Barishal. (B) Rehabilitation of BC road from Torki Cow Hat to Firoz Howlader House Tin Kona Via Sazol Kazi Counsilor House ch 0.00m to 825m by Bituminous Dense Carpeting DC Under Gournadi Pourashava District Barishal.(C) Improvement of road from Gournadi Goinaghata Bridge to Gournadi Bondar Katcha Bazar via Abdur rob Serniabad Hostel Ch 0.00m to 930m by Bituminous Dense Carpeting DC with Four U-Drain Gournadi Pourashava District Barishal.
|
|
2.24
|
0.00
|
0.00
|
149.30
|
M/S Howleder Enterprise
|
149.28
|
27/10/2020
|
03/11/2020
|
30/06/2022
|
100
|
0.00
|
0
|
29/09/2022
|
|
41
|
Barishal
|
5
|
muladi
|
25
|
824
|
UIIP/PCO/G-36
|
Implementation & Supply 439 nos Waste Basket (120 ltr) & 30 nos Non-motorized vehicle (van) under Muladi Pourashava District: Barishal.
|
|
|
|
1.00
|
39.98
|
RFL Plastrics Limited
|
0.00
|
|
|
|
0
|
0.00
|
0
|
08/10/2024
|
|
42
|
Barishal
|
5
|
muladi
|
25
|
824
|
UIIP-BC/PCO/W-555
|
(A) Improvement of RCC Road from Boro Mosque Delwar Shop To Graveyard (Ch. 0.00-105 m) at ward no. 06 Under Muladi Pourashova District. Barishal.
(B) Improvement of RCC Road from Main Road To H/O Ketab Ali Bapary/Jakir Bapary (Ch. 0.00-160 m) at ward No.02.Under Muladi Pourashava District Barishal.
(C) Improvement of RCC Road from Main Road Shah Alam Kha House To Habib Sikder (Paner Bor) (Ch. 0.00-305m) at ward No.03.Under Muladi Pourashava District Barishal.
(D) Improvement of RCC Road from Main Road To H/O Khalek Kha To Masud Mollah (Ch. 0.00-100m) ward No.04.Under Muladi Pourashava District Barishal.
(E) Improvement of RCC Road from CMB To Ajom Bapary & Bappy House (Ch. 0.00-320m) at ward No.07.Under Muladi Pourashava District Barishal.
(F) Improvement of RCC Road from Main Road To H/O Shipu Kha (Ch. 0.00-250 m) at ward No.02.Under Muladi Pourashava District Barishal.
|
|
1.29
|
|
|
206.23
|
AKA-PC (JV)
|
214.56
|
06/06/2023
|
12/06/2023
|
05/06/2024
|
100
|
214.09
|
100
|
10/10/2024
|
|
43
|
Barishal
|
5
|
muladi
|
25
|
824
|
UIIP-BC/PCO/W-416
|
A) Construction of RCC Road Starting from Bosar Howlader House To Kazi Kamal House Ch. 0.00-350 m.Ward No.09.Under Muladi Pourashava District Barishal.
B) Construction of RCC Road Starting from Arif Shop To Praimary School Ch. 0.00-385m.Ward No.06 Under Muladi Pourashava District. Barishal.
|
|
0.74
|
0.00
|
0.00
|
123.61
|
M/S. DEIP ENTERPRISE
|
123.32
|
17/01/2022
|
23/01/2022
|
16/01/2023
|
100
|
123.30
|
100
|
10/10/2024
|
|
44
|
Barishal
|
5
|
muladi
|
25
|
824
|
UIIP-BC/PCO/W-419
|
A) Constructin Of 1-Vent 4.00 X4.00m Rcc Box Culvert on Mira Bari Canel.In Ward No.06.Under Muladi Pourashava
B) Constructin Of 1-Vent 4.00 X4.00m Rcc Box Culvert on Akkas Howlader Canel Ward No.06 Under Muladi Pourashava
C) Constructin Of 1-Vent 3.00 X3.00m Rcc Box Culvert on Monosagong Ghat Canel Ward No.01 Under Muladi Pourashava
D) Constructin Of 1-Vent 4.00 X4.00m Rcc Box Culvert on Babul Sardar House Canel Ward No. 08 Under Muladi Pourashava
|
|
|
15.00
|
0.00
|
88.72
|
M/S Al Mamun Entr.
|
88.57
|
07/12/2021
|
14/12/2021
|
06/12/2022
|
100
|
88.55
|
100
|
29/09/2022
|
|
45
|
Barishal
|
5
|
muladi
|
25
|
824
|
UIIP-BC/PCO/W-418
|
Construction Of RCC Drain starting from Dhali Market To East Bajar Ward No-06 Under Muladi Pourashava. Ch.0.00-336m
|
|
|
0.00
|
0.00
|
58.60
|
M/S. DEIP ENTERPRISE
|
58.23
|
07/12/2021
|
14/12/2021
|
06/12/2022
|
100
|
58.21
|
100
|
29/09/2022
|
|
46
|
Barishal
|
5
|
muladi
|
25
|
824
|
UIIP-BC/PCO/W-417
|
A) Construction Of RCC Drain starting from Mithur Bari Culvert To Canel Ward No-04 Under Muladi Pourashava.Ch.0.00-306m
B) Construction Of RCC Drain starting from Poura Kitchen Market To Kheya Ghat Ward No-06 Under Muladi Pourashava Ch.0.00-400m
|
|
|
0.00
|
0.00
|
123.10
|
m/s Khan Abdus Sabur
|
122.92
|
07/12/2021
|
14/12/2021
|
06/12/2022
|
100
|
122.87
|
100
|
29/09/2022
|
|
47
|
Barishal
|
5
|
muladi
|
25
|
824
|
UIIP-BC/PCO/W-415
|
A.Construction Of Rcc Road starting from Mira Bari Mosque To Bapary bari House End of River. Ward No.06.Under Muladi Pourashava.Ch.0+00-0+410m.l.
B.Rehabilitation Of BC Road Strarting from Terochar Madrasha To Farid Howlader House Ch. 0.00-560m.by Bituminous Dense Carpeting.Ward No.02 Under Muladi Pourashava District. Barisha
|
|
0.97
|
0.00
|
0.00
|
98.44
|
M/S KHAN ABDUS SABUR
|
98.28
|
17/01/2022
|
23/01/2022
|
16/01/2023
|
100
|
98.24
|
100
|
29/09/2022
|
|
48
|
Barishal
|
5
|
muladi
|
25
|
824
|
UIIP-BC/PCO/W-232
|
01.Construction of RCC Road in Mollah Bazar Bridge To Rastar Matha End Of The River Via Vranir Khal.In Ward No.03.Under Muladi.Pourashava.Ch.000-0820m.
02.Construction of RCC Road in Boroi Tola To Salam mal House Via Sardar Bari.In Ward No.07.Under Muladi Pourashava.Ch.000-0645m.
|
|
1.47
|
0.00
|
0.00
|
135.56
|
M/S KHAN ABDUS SABUR
|
135.22
|
30/11/2020
|
07/12/2020
|
06/12/2020
|
100
|
135.18
|
100
|
29/09/2022
|
|
49
|
Barishal
|
5
|
muladi
|
25
|
824
|
UIIP-BC/PCO/W-231
|
01.Construction Of Rcc Road In East Side of Taltola Bajar To Anwar Shikder House.In Ward No.08.Under Muladi Pourashava.Ch.000-0813.(Salvage Tk=196102.00)
02.Construction of RCC Road in Main Road To Atik House House.In Ward No.02.Under Muladi Pourashava.Ch.000-0450m.(Salvage Tk=129515.00)
|
|
1.26
|
0.00
|
0.00
|
120.25
|
M/S KHAN ABDUS SABUR
|
120.00
|
30/11/2020
|
07/12/2020
|
06/12/2021
|
100
|
119.88
|
100
|
29/09/2022
|
|
50
|
Barishal
|
5
|
muladi
|
25
|
824
|
UIIP-BC/PCO/W-116
|
01.Construction of RCC Road in Launch Ghat To Brick Field Via Mosque In Ward No.05.Under Muladi Pourashava.Ch.000-0780m.
02.Construction of RCC Road in GP Tower To CMB Road Via Sopon House In Ward No.07.Under Muladi.Pourashava.Ch.000-0450m.
|
|
1.23
|
0.00
|
0.00
|
112.74
|
M/S Rupali Construction
|
112.51
|
08/09/2020
|
13/08/2020
|
12/08/2020
|
100
|
112.47
|
100
|
29/09/2022
|
|
51
|
Barishal
|
5
|
muladi
|
25
|
824
|
UIIP-BC/PCO/W-115
|
01.Construction of RCC Road in CMB Road To Poura Border.In Ward No.07.Under Muladi.Pourashava.Ch.000-0892m
02.Construction of RCC Road in Siklone Centre To Stadium.In Ward No.04.Under Muladi Pourashava.Ch.000-0450m.
|
|
1.34
|
0.00
|
0.00
|
119.40
|
M/S Rupali Construction
|
124.16
|
09/08/2020
|
|
12/08/2021
|
100
|
124.09
|
100
|
29/09/2022
|
|
52
|
C. nawabganj
|
47
|
shibganj
|
341
|
824
|
UIIP-BC/PCO/W-485
|
A) Construction of One Storied Vegetables & Agricultural Products Market of 5 Storied Foundation (Floor Area=314 sqm) at Shibganj Kacha Bazer under Shibganj Pourashava Chapai Nawabganj.
|
|
|
0.00
|
1.00
|
104.17
|
M/S Nisha Enterprise
|
104.04
|
28/06/2022
|
21/07/2022
|
20/07/2023
|
0
|
0.00
|
0
|
29/09/2022
|
|
53
|
C. nawabganj
|
47
|
shibganj
|
341
|
824
|
UIIP-BC/PCO/W-357
|
A) Construction of Single vent Box Culvert (2.6mx2.6m ) at jalmachmary behind Primary School in Shibganj Pourashava Area ward no. 07 under Shibganj Pourashava length- 7.00m
B) Construction of Single vent Box Culvert (2.6mx2.6m ) at Chondipur beside H/O Hazrat in Shibganj Pourashava Area. ward no. 07 under Shibganj Pourashava length- 7.00m
C) Construction of Single vent Box Culvert (2.6mx2.6m ) at Pitholitala Boglauril in Shibganj Pourashava Area. ward no. 07 under Shibganj Pourashava length- 7.00m
D) Construction of Single vent Box Culvert (2.6mx2.6m) at Salimabad Khanpara H/O Gudha Hazil in Shibganj Pourashava Area. ward no. 07 under Shibganj Pourashava length- 7.00m
E) Construction of Single vent Box Culvert at Choturpur beside H/O Rakib in Shibganj Pourashava Area. ward no. 07 under Shibganj Pourashava . length- 7.00m
|
|
|
35.00
|
0.00
|
77.38
|
Rithin & G.R (JV)
|
65.66
|
16/02/2022
|
22/02/2022
|
21/08/2022
|
100
|
11.44
|
17
|
29/09/2022
|
|
54
|
C. nawabganj
|
47
|
shibganj
|
341
|
824
|
UIIP-BC/PCO/W-356
|
A) Construction & Re-construction of drain by RCC start from Shibganj Girls School mour to Barendro Road drain via Contractor's Somiti & H/O Lotif ( Ch. 0.00-500.00m) under Shibganj Pourashava .B) Construction of drain by RCC start from Choto Chalk mour to Jalmachmary Barendro Road via Kadomtala Culb ( Ch. 0.00-410.00m) under Shibganj Pourashava .
|
|
|
0.00
|
0.00
|
162.06
|
Rithin & G.R (JV)
|
138.81
|
22/02/2022
|
|
21/08/2022
|
15
|
14.85
|
11
|
29/09/2022
|
|
55
|
C. nawabganj
|
47
|
shibganj
|
341
|
824
|
UIIP-BC/PCO/W-355
|
Construction & Re-Construction of drain by RCC start from Shibganj Bazar Bisu's Shop to Barandro Road via Shibganj Pourashava uttar Gate and H/O Lotif (Ch.: 0.00-623.00m) under Shibganj Pourashava .
|
|
|
0.00
|
0.00
|
107.12
|
MD. Abdul mannan
|
88.90
|
22/02/2022
|
|
21/08/2022
|
40
|
17.90
|
20
|
29/09/2022
|
|
56
|
C. nawabganj
|
47
|
shibganj
|
341
|
824
|
UIIP-BC/PCO/W-301
|
(a) Improvement of existing HBB road by BC start from Dowlatpur Hazipara mosque to H/O Alauddin at Dowlatpur Kabirajpara via Hazaridanga H/O late Sadek to Babupara H/O late Kalu Member. Ch. 00-500.00m ward no. 04 Under Shibganj Pourashava.
(b) Improvement of existing HBB road by BC start from Dowlatpur Kadomtala moor to H/O Monirul Principal vai H/O Badol at Dowlatpur Mondoltola. Ch. 00-420.00m. Ward no. 04 Under Shibganj Pourashava.
(c) Rehabilitation of Alidanga damage BC road by BC start from H/O Nabokanto dadu to R&H Road Ch. 00-510.00m Under Shibganj Pourashava.
|
|
1.43
|
0.00
|
0.00
|
99.83
|
M/S Rony Enterprise & M/S Shefat International JV
|
82.18
|
10/09/2020
|
30/04/2021
|
09/09/2021
|
100
|
82.18
|
100
|
29/09/2022
|
|
57
|
C. nawabganj
|
47
|
shibganj
|
341
|
824
|
UIIP-BC/PCO/W-248
|
(a) Improvement of Kacha Road by RCC with Protective work starting from Club Road to House of Oni mia via House of Diamond at Mordana Miapara. Ch. 00-125.00m. Under Shibganj Pourashava.
b) Improvement of Kacha Road by RCC with Protective work starting from Club Road to House of Yeasin Ali at Mordana. Ch. 00-100.00m. Under Shibganj Pourashava.
(c) Improvement of Mordana existing HBB Road by RCC starting from moon light Club to H/O Kalam. Ch. 00-450.00m. Under Shibganj Pourashava
(d) Improvement of Kacha Road by RCC Starting from Mordana HBB Road H/O. Khudi to House of Dablu at Mordana. Ch. 00-300.00m. ward no. 09. Under Shibganj Pourashava.
|
|
0.98
|
0.00
|
0.00
|
140.81
|
Opal-Pathbangl- JV
|
130.95
|
10/09/2020
|
30/04/2021
|
09/09/2021
|
100
|
130.94
|
100
|
29/09/2022
|
|
58
|
C. nawabganj
|
47
|
shibganj
|
341
|
824
|
UIIP-BC/PCO/W-247
|
Improvement of existing earthen Road by BC starting from H/O Polash at Choturpur to H/O Abdul Mannan via H/O Hazrat Ali at Jalmachmary. Ch. 00-1000.00m, ward no. 05, Under Shibganj Pourashava.
|
|
1.00
|
0.00
|
0.00
|
83.08
|
Opal-Pathbangl- JV
|
71.48
|
10/09/2020
|
30/04/2021
|
09/09/2021
|
100
|
71.47
|
100
|
29/09/2022
|
|
59
|
C. nawabganj
|
47
|
shibganj
|
341
|
824
|
UIIP-BC/PCO/W-246
|
(a) Improvemrnt of damage existing BC & WBM Road by Bituminous carpeting starting from Barendro Road to H/O Al-Abdur Razzak via H/O Hazrat Mistiry at Jalmachmary Ch. 00-1400.00m ward no. 07, Shibganj Pourashava. (b) Improvement of existing WBM Road by BC starting from Shop of Tohid to H/O Anamul Maulana at Roshulpur Ch. 00-500.00m. ward no. 06, Under Shibganj Pourashava.
|
|
1.90
|
0.00
|
0.00
|
92.43
|
Hanzu Enterprise & Selim Reza- JV
|
78.35
|
10/09/2020
|
30/04/2021
|
09/09/2021
|
100
|
78.27
|
100
|
29/09/2022
|
|
60
|
C. nawabganj
|
47
|
shibganj
|
341
|
824
|
UIIP-BC/PCO/W-240
|
Rehabilitation of existing damage Selimabab BC & HBB road by BC starting from Shimul Talal Moure to Babupukur via paikor tala. Ch. 00-1110.00m Under Shibganj Pourashava.
|
|
1.11
|
0.00
|
0.00
|
89.10
|
M/S Rony Enterprise & M/S Shefat International JV
|
76.19
|
10/09/2020
|
30/04/2021
|
09/09/2021
|
100
|
76.19
|
100
|
29/09/2022
|
|
61
|
C. nawabganj
|
47
|
shibganj
|
341
|
824
|
UIIP-BC/PCO/W-97
|
Improvement of existing earthen & HBB road by BC start from H/O Humayon to H/O Hazrat via Oktiya Mosjid twowards bottala moor at Chondipur Ch. 00-1000.00m, in ward no. 07. Under Shibganj Pourashava, Dist: Chapai Nawabganj.
|
|
1.00
|
0.00
|
0.00
|
94.69
|
Opal International
|
95.31
|
10/09/2020
|
|
09/09/2021
|
100
|
95.31
|
100
|
29/09/2022
|
|
62
|
C. nawabganj
|
47
|
shibganj
|
341
|
824
|
UIIP-BC/PCO/W-96
|
(a) Improvement of Existing damage WBM road by BC start from H/O Late Menu Master to H/O Sayed former councilor at Pitholitala with 02 nos R.C.C cross drain. Total length= 1325.00m, ward no. 08 Under Shibganj Pourashava, Dist: Chapai Nawabganj. (b) Improvement of exiting damage HBB road by BC start from H/O Cethu to H/O Alauddin via H/O Subed at Pitholitala north para Ch. 00-650.00m ward no. 03 Under Shibganj Pourashava, Dist: Chapai Nawabganj.
|
|
1.98
|
0.00
|
0.00
|
121.55
|
Opal International
|
109.39
|
04/11/2020
|
11/11/2020
|
10/11/2021
|
100
|
109.29
|
100
|
29/09/2022
|
|
63
|
C. nawabganj
|
47
|
shibganj
|
341
|
824
|
UIIP-BC/PCO/W-95
|
Improvement of existing HBB road by BC start from Mohisgara Borendo road to towards culvert at Mithupur Jagnathpur.Ch. 00-1115.00m, ward no. 09 Under Shibganj Pourashava, Dist: Chapai Nawabganj.
|
|
1.12
|
0.00
|
0.00
|
108.83
|
Opal International
|
97.94
|
10/09/2020
|
|
09/09/2021
|
100
|
97.93
|
100
|
29/09/2022
|
|
64
|
Chandpur
|
12
|
kachua
|
90
|
824
|
UIIP/PCO/G-42
|
Implementation & Supply 602 nos Waste Basket (120 ltr) & 20 nos Non-motorized vehicle (van) under Kachua Pourashava District: Chandpur.
|
|
|
|
1.00
|
39.98
|
RFL Plastrics Limited
|
30.23
|
|
|
|
0
|
0.00
|
0
|
09/10/2024
|
|
65
|
Chandpur
|
12
|
kachua
|
90
|
824
|
UIIP-BC/PCO/W-565
|
A) Improvement of Road and widening Work at Damaluya Baro bari Road Start From Kachua Taguria Road to Damaluya Baro bari Bridge ch (0.00-1000.00m) infornt of kamal Councillor Home and connected Hossanpur road (Ward No- 07), under Kachua Pourashava
B) Improvement work of RCC Road From Kachua Badpur road to kachua postoffice road .(Ch0.00~127.00m). Ward no -08 Under kachua pourashava,Chandpur.
|
|
1.13
|
|
|
88.33
|
M/S Tanim Traders
|
92.53
|
28/08/2023
|
03/09/2023
|
05/03/2024
|
100
|
83.69
|
90
|
09/10/2024
|
|
66
|
Chandpur
|
12
|
kachua
|
90
|
824
|
UIIP-BC/PCO/W-564
|
A) Improvement of RCC Drain Start from J.B Electric to Banoful Hotel ( Danbazar road) ch 0.00-37.00m link chal Bazar road 122.00m and Bisno pal hope to proposed bridge ch 0.00-43.00m ward no -08,under kachua pourashava
B) Improvement of Road by RCC Start from J.B Electric to Banoful Hotel ( Danbazar road) ch 0.00-37.00m link chal Bazar road 122.00m and Bisno pal hope to proposed bridge ch 0.00-43.00m ward no -08,under kachua pourashava
C)Improvement of RCC Road Start from Nurani hotel to chattel Market (Present Wood Market) ward no -08,under kachua pourashava
|
|
0.32
|
|
|
87.27
|
M/S Tamim Traders
|
91.50
|
28/08/2023
|
03/09/2023
|
05/03/2024
|
100
|
91.08
|
100
|
09/10/2024
|
|
67
|
Chandpur
|
12
|
kachua
|
90
|
824
|
UIIP-BC/PCO/W-563
|
A) Improvement of BC Road from Kachua-Rogunanthpur Road Kachua Upzilla Hospital to end of Poura Area Ch.0.00-1500.00m Ward no-02 & 03 Kachua Pourashava, Chandpur.
B) Improvement of BC Road From Preyotush Podder Shop to Kariya Mojumdar Bari Bridge Ward No-05 (Ch.0.00-615.00m) Under Kachua Pourashava, Chandpur. (Salvage Amount-1,83,680.00)
|
|
2.12
|
|
|
126.86
|
M/S Abdullah Enterprise
|
132.70
|
28/08/2023
|
03/08/2023
|
05/03/2024
|
71
|
60.37
|
45
|
09/10/2024
|
|
68
|
Chandpur
|
12
|
kachua
|
90
|
824
|
UIIP-BC/PCO/W-569
|
(1) Construction of RCC Road by the side of kachua Upzilla Parishad Road From Preyotush Podder Shop To Kachua Hajigonj by Pass road .(Ch0.00~393.00m)and infront of Upzilla hospital ch(0.00-60.00) Under kachua pourashava,Chandpur.
(2) Improvement of BC Road from Kachua Gulbahar Road to Koachanpur Gazirpole Road ch 0.00-990.00 meter Ward no01-02 under kachau pourashava
|
|
1.43
|
|
|
170.69
|
Jeet-Tanim (JV)
|
170.59
|
06/03/2023
|
10/03/2023
|
05/03/2024
|
100
|
170.49
|
100
|
09/10/2024
|
|
69
|
Chandpur
|
12
|
kachua
|
90
|
824
|
UIIP-BC/PCO/W-467
|
A) Construction of Shed for Public Transport Passenger (28.00 sqm) under Under Kachua Pourashava, Chandpur.
B) Construction of One Storied Public Toilet (Type A=56 sqm) under Under Kachua Pourashava, Chandpur.
C) Construction of One Storied Vegetables & Agricultural Products Market of 5 Storied Foundation (Floor Area=314 sqm) under Under Kachua Pourashava, Chandpur.
|
|
|
|
3.00
|
149.27
|
MS Ousmani and Brothers
|
143.23
|
20/02/2023
|
20/02/2023
|
30/12/2024
|
33
|
21.63
|
15
|
09/10/2024
|
|
70
|
Chandpur
|
12
|
kachua
|
90
|
824
|
UIIP-BC/PCO/W-348
|
A) Construction of RCC Drain from Kachua Gulbahar CNG stand H/O Iqbal to Palashpur Masimpur Road (Ch:0.00-165.00m) Ward No.-03 Under Kachua Pourashava Chandpur.
B) Construction of RCC Drain starting from Kachua Post Office to Khal Adjacent H/O Abdul Momin Master (Ch:0.00-126.00m) Ward No.-08 Under Kachua Pourashava Chandpur.
|
|
|
0.00
|
0.00
|
59.72
|
MIS Abdullah & Basher (JV)
|
58.77
|
16/03/2022
|
24/03/2022
|
22/03/2023
|
100
|
53.37
|
91
|
09/10/2024
|
|
71
|
Chandpur
|
12
|
kachua
|
90
|
824
|
UIIP-BC/PCO/W-347
|
A) Construction of RCC Drain From Kachua Sachar Road mor VIP Hospital to SR Office East site Near Khal (Ch:0.00m-126.00m) Ward No.-07 Under Kachua Pourashava Chandpur.
B) Construction of RCC Drain at Nurani Hotel Via Fish Market to Old Cow Market (Ch:0.00m-135.00m) Ward No.-08 Under Kachua Pourashava Chandpur.
C) Construction of RCC Drain From Kachua Upazila Prishad Road H/O Mizanur Rahman Near Existing RCC Drain End to H/O Edris Bakaul South Side Near Khal (Ch:0.00-195.00m) Ward No.-03 Under Kachua Pourashava Chandpur.
|
|
|
0.00
|
0.00
|
96.15
|
M/S Kamal Enterprise
|
95.77
|
27/02/2022
|
02/03/2022
|
02/03/2023
|
100
|
95.46
|
100
|
09/10/2024
|
|
72
|
Chandpur
|
12
|
kachua
|
90
|
824
|
UIIP-BC/PCO/W-346
|
A) Rehabilitation Works at Kachua Sachar Road VIP Hospital to Kachua Taguria Road End of Poura Area (Ch: 0.00-1015.00m) Ward No-07 Under Kachua Pourashava Chandpur .
B) Construction Work of RCC Road at Kachua Bedpur road to Karish Bachu Mia Home (Ch:0.00-455.00m) & Link Road H/O Abdur Rab Master to Dr. Fajar Ali Home Pond North Side (Ch:0.00-190.00m) Ward No-08 Under Kachua Pourashava. Chandpur.
|
|
1.96
|
0.00
|
0.00
|
87.07
|
M/S Shafiq Enterprise
|
82.88
|
03/02/2022
|
10/02/2022
|
08/02/2023
|
100
|
82.85
|
100
|
09/10/2024
|
|
73
|
Chandpur
|
12
|
kachua
|
90
|
824
|
UIIP-BC/PCO/W-345
|
A) Construction Work of RCC Road & Palisading work start from Kachua Hajigonj bypass Road H/O Osman Mia to Kariya domria road Kariya North Para Pokania Madrasa (Ch:0.00-275m) Link Osman Mia Bari Pond par (Ch:0.00-120.00m) Ward No-03&04 Under Kachua Pourashava Chandpur.
B) Construction Work of RCC Road from Kachua Bedpur Road to Kachua Nobabpur Road Ward No-08 Under Kachua Pourashava Chandpur. ( Ch:0.00-195.00m )
C) Construction Work of RCC Road from Kachua Dhan Bazar Bridge to Taj Tredars start from Dhan Bazer Bridge Ward No-08 Under Kachua Pourashava Chandpur. (Ch:0.00-166.00m)
D) Rehabilitation Work at Kariya Domoria Road start from Kachua Paranpur Road Mojumdar Bari Bridge to Kariya Rahim Councillor old Home (Ch:0.00-560.00m) Ward No-04 Under Kachua Pourashava Chandpur.
|
|
1.26
|
0.00
|
0.00
|
131.18
|
m/s Tanim Traders
|
131.12
|
25/09/2021
|
30/09/2021
|
29/09/2022
|
100
|
130.59
|
100
|
09/10/2024
|
|
74
|
Chandpur
|
12
|
kachua
|
90
|
824
|
UIIP-BC/PCO/W-456
|
A) Construction of Three Vent (5.00x4.00m) RCC Box Culvert on Kachua Shoe Maker Market near Khal (connecting road RCC Culvert Bridge) under Kachua Pourashava, Chandpur.
B) Construction of One Vent (4.00x5.00m) RCC Box Culvert on Karish Ismail Hafej Bari near Khal (Kachua to Nababpur road RCC Culvert) under Kachua Pourashava, Chandpur.
|
|
|
19.00
|
0.00
|
88.19
|
Alamgir Hayder Bhuiya
|
83.64
|
09/05/2022
|
16/05/2022
|
16/05/2023
|
0
|
0.00
|
0
|
29/09/2022
|
|
75
|
Chandpur
|
12
|
kachua
|
90
|
824
|
UIIP-BC/PCO/W-252
|
Construction of RCC U Drain with Cover Slab at Kachua Banga Bondhu Degree College North side Khal, ward no.-08 (Ch. 0.00-95.00m) under Kachua Pourosava.
|
|
|
0.00
|
0.00
|
54.09
|
M/S Alif Enterprise
|
44.02
|
24/01/2021
|
|
30/01/2022
|
60
|
15.82
|
36
|
29/09/2022
|
|
76
|
Chandpur
|
12
|
kachua
|
90
|
824
|
UIIP-BC/PCO/W-251
|
(A) Construction Works of RCC Road & Retaining Wall from Kachua Bedpur Road to Karish Sirajdilar Home Road start fro Kachua Bedpur BC Road, ward no27-06 (Ch. 0.00m-215m) under Kachua Pourosava.
(B)Construction Works of RCC Road & Retaining Wall from Kachua Teguria Road to Dhamalua wet8324 Para miazi Bari (Ch. 0.00m-200m) under Kachua Pourosava.
|
|
0.42
|
0.00
|
0.00
|
121.15
|
M/S Tanim Traders
|
100.38
|
24/01/2021
|
|
30/01/2022
|
100
|
100.19
|
100
|
29/09/2022
|
|
77
|
Chandpur
|
12
|
kachua
|
90
|
824
|
UIIP-BC/PCO/W-250
|
Rehabilitation works and widening of Kachua Nababpur Road by BC start from Post Office to Karish thakurbari Pond Par (Ch. 000m-1060m) under Kachua Pourosava.
|
|
1.06
|
0.00
|
0.00
|
83.37
|
M/S Renu mia
|
83.25
|
14/01/2021
|
|
19/01/2022
|
100
|
85.59
|
100
|
29/09/2022
|
|
78
|
Chandpur
|
12
|
kachua
|
90
|
824
|
UIIP-BC/PCO/W-249
|
Rehaliation works and widening of Kachua Nababpur road by BC start from Karish Thakurbari pond par north site to end of poura area (ch 1060m-2405m) Under Kachua pourashava.
|
|
1.35
|
0.00
|
0.00
|
89.77
|
M/S Renu mia
|
91.00
|
14/01/2021
|
|
19/01/2022
|
100
|
91.00
|
100
|
29/09/2022
|
|
79
|
Chandpur
|
12
|
kachua
|
90
|
824
|
UIIP-BC/PCO/W-53
|
(a) Construction work of RCC Road & Retaining wall Start from Kachua Gaulbahar Road to Baliyatoli Rahman hazi bari road. Ward no-01 Under Kachua Pourashava for the year of 2018-19. Ch. 0.00-0.215
b) Construction Work of RCC Road from Kachua Golbahar Road to H/O Abu Sofiyan via Baliyatoly pal Bari Jame mosque Road. Word no-01 under Dachua Pourashava for the year of 2018-19. Ch. 0.00- 0.395
(C) Construction work of RCC Road from Kachua Golbahar Road to h/o bachu mia start from Koachancipur guni mia cashiar home north side corner Word no-02 Under Kachua pourashava for the year of 2018-19.ch 00-270m
|
|
0.85
|
0.00
|
0.00
|
105.99
|
MAM Construction Ltd
|
92.22
|
12/08/2020
|
19/08/2020
|
18/08/2021
|
100
|
92.19
|
100
|
29/09/2022
|
|
80
|
Chandpur
|
12
|
kachua
|
90
|
824
|
UIIP-BC/PCO/W-52
|
(a) Construction work of RCC Road & Retaining wall Start from Kachua Hajigong bypass via H/O Krisna patikor to Kariya Dumoria Road. Ward No-04 Under Kachua pourashava for the year of 2018-19.
(b) Construction work of RCC Road & Retaining wall from Kachua paranpur road to kariya H/O Shahidullah. Kariya eidgah road start from BC Road ward no-05 under Kachua pourashavafor the year of 1018-19.
|
|
0.85
|
0.00
|
0.00
|
156.60
|
MAM Construction Ltd
|
136.24
|
12/08/2020
|
19/08/2020
|
31/03/2022
|
100
|
136.21
|
100
|
29/09/2022
|
|
81
|
Chattogram
|
11
|
fatikchari
|
70
|
824
|
UIIP/PCO/G-43
|
Implementation & Supply 358 nos Waste Basket (120 ltr) & 35 nos Non-motorized vehicle (van) under Fatikcahri Pourashava District: Chittagong.
|
|
|
|
1.00
|
40.00
|
RFL Plastrics Limited
|
26.95
|
20/02/2024
|
27/02/2024
|
26/02/2025
|
0
|
0.00
|
0
|
14/10/2024
|
|
82
|
Chattogram
|
11
|
fatikchari
|
70
|
824
|
UIIP-BC/PCO/W-572
|
Constrction of One - Storied Vegetable & Agricultural Product Market on 5 - std Foundation under Fatikchhari Pourashava District: Chattogram.
|
|
|
|
1.00
|
87.20
|
M/S SA Traders
|
82.15
|
19/07/2023
|
27/07/2023
|
27/07/2024
|
70
|
37.96
|
46
|
14/10/2024
|
|
83
|
Chattogram
|
11
|
fatikchari
|
70
|
824
|
UIIP-BC/PCO/W-434
|
Construction of Drain Starting from Fatikchhari central Eidgah to Chilonia Chora through Soyodpara Ch.0+00-0+900.00m . Under Fatikchhari Pourashava
|
|
|
0.00
|
0.00
|
236.65
|
M/S- Nipa Enterprise – S A Traders (JV)
|
202.80
|
08/02/2022
|
09/02/2022
|
08/02/2023
|
75
|
117.68
|
58
|
14/10/2024
|
|
84
|
Chattogram
|
11
|
fatikchari
|
70
|
824
|
UIIP-BC/PCO/W-433
|
(A) Construction of Culvert on the Amanbazar road (3.50x3.00) 6m width
(B) Construction of Culvert on the Nahir Md. Chy. Road 2(2.50x3.00) 6m width
(C) Construction of Culvert on the Eidgah to Gawsiya Market road 2(2.50x3.00) 6m width
(D) Improvement of Kabir hazi road by H.B.B, Guide wall & sand filling Ch.0+000-Ch.0+490.00m .Starting from Gohira – Heyako road.
(E) Improvement of Rangamatiya Sheba Khola road by H.B.B Ch.0-110,Ch.570-875m.under Fatikchhari Pourashava
|
|
0.91
|
13.50
|
0.00
|
121.14
|
M/S- Nipa Enterprise – S A Traders (JV)
|
100.44
|
08/02/2022
|
09/02/2022
|
08/02/2023
|
100
|
99.38
|
100
|
14/10/2024
|
|
85
|
Chattogram
|
11
|
fatikchari
|
70
|
824
|
UIIP-BC/PCO/W-150
|
( A) Improvement of Husmot Ali Tilok Chan road by carpeting and partial protective work in required place (Ch.0+000-Ch. 1+690m).Starting From Munafkhil Madrasha road. Under Fatikchhari Pourashava.
|
|
1.69
|
0.00
|
0.00
|
140.13
|
Kingdom Builders Ltd.
|
139.00
|
15/07/2021
|
26/08/2021
|
25/08/2022
|
100
|
139.00
|
100
|
14/10/2024
|
|
86
|
Chattogram
|
11
|
fatikchari
|
70
|
824
|
UIIP-BC/PCO/W-149
|
(A) Improvement of Saw mill to Shahid Mahbubul Alam road via Bagmara Mosque by Carpeting & Const. of 1 nos cross drain & partial Protective work in required place (ch. 0.00-1975m). starting from Shahid Mahbubul Alam road under Fatikchhari Pourashava.
|
|
1.98
|
0.00
|
0.00
|
163.80
|
M/S. R N Enterprise
|
171.18
|
07/02/2021
|
11/02/2021
|
20/04/2022
|
100
|
148.01
|
87
|
29/09/2022
|
|
87
|
Chattogram
|
11
|
fatikchari
|
70
|
824
|
UIIP-BC/PCO/W-148
|
(A) Improvement of Jamanul Quran Madrasha road by Carpeting & Const. of 2 nos cross drain & partial Protective work (ch. 0+ 000- ch. 0+ 748m).starting from Khagrachhari road. under Fatikchhari Pourashava.
(B) Rehabilitation of Ramgor old bypass road by Carpeting & Const. of partial Guide wall ch. 0+000- ch. 0+336m.Starting from Ananda Club.under Fatikchhari Pourashava.
|
|
1.08
|
0.00
|
0.00
|
97.98
|
M/S. R N Enterprise
|
96.98
|
07/02/2021
|
11/02/2021
|
07/02/2022
|
100
|
96.98
|
100
|
29/09/2022
|
|
88
|
Chattogram
|
11
|
fatikchari
|
70
|
824
|
UIIP-BC/PCO/W-110
|
a) Improvement of Bhuiyan house road by carprting & partial guid wall in required place ch.0+000-ch.0+900m starting from Gohira-Heyako road, Under Fatikchhari Pourashava.
b) Improvement of Fanerkhil road rest part by carprting & partial protective work in required place ch.0+000-ch.0+537m starting from Munafkhil Madrasha road, Under Fatikchhari Pourashava.
|
|
537.90
|
0.00
|
0.00
|
119.42
|
M/S. Alif Trading
|
129.65
|
20/12/2020
|
27/12/2020
|
26/12/2021
|
100
|
129.65
|
100
|
29/09/2022
|
|
89
|
Chattogram
|
11
|
fatikchari
|
70
|
824
|
UIIP-BC/PCO/W--109
|
a) Improvement of Baroyarhat road by carprting & Const. of 1 no cross drain in required place & partial protective work ch.0+000-ch.0+520m starting from Baroyarhat to Amtol road, Under Fatikchhari Pourashava.
b) Improvement of Ludi Sikder road by carprting & Const. of 1 no cross drain in required place ch.0+000-ch.0+890m starting from Munafkhil Madrasha road, Under Fatikchhari Pourashava.
|
|
1.41
|
0.00
|
0.00
|
122.07
|
M/S. Alif Trading
|
132.48
|
20/12/2020
|
27/12/2020
|
26/12/2021
|
100
|
132.48
|
100
|
29/09/2022
|
|
90
|
Cox's bazar
|
13
|
moheskhali
|
126
|
824
|
UIIP/PCO/G-47
|
Implementation & Supply 520 nos Waste Basket (120 ltr) & 25 nos Non-motorized vehicle (van) under Moheshkhali Pourashava District: Cox's Bazar.
|
|
|
|
1.00
|
39.95
|
RFL Plastrics Limited
|
26.25
|
18/03/2024
|
18/03/2024
|
17/06/2024
|
0
|
0.00
|
0
|
15/10/2024
|
|
91
|
Cox's bazar
|
13
|
moheskhali
|
126
|
824
|
UIIP-BC/PCO/W-580
|
A) Construction of Shed for Public Transport Passenger (28.00 sqm) Ward No.-04 under Moheshkhali Pourashava, District: Cox’s Bazar.
B) Construction of Single Storied Public Toilet Building (Type A=56 sqm) Ward No.-04 under Moheshkhali Pourashava, District: Cox’s Bazar.
C) Construction of One Storied Vegetables & Agricultural Products Market of 5 Storied Foundation (Floor Area=145.00 sqm) Ward No.-07 Moheshkhali Pourashava, District: Cox’s Bazar.
|
|
|
|
3.00
|
121.22
|
M/S Asad Enterprise
|
118.14
|
26/10/2023
|
02/11/2023
|
01/11/2024
|
42
|
0.00
|
0
|
15/10/2024
|
|
92
|
Cox's bazar
|
13
|
moheskhali
|
126
|
824
|
UIIP-BC/PCO/W-571
|
Construction of RCC Drain from Shop of Aujit Babu to Shop of Shala Uddin Via Namer Bazer Box Culvert, Ward No.-07 Under Moheshkhali Pourashava, District: Cox’s Bazar. (Ch.0.00-310.00m)
|
|
0.31
|
|
|
71.51
|
M/s Asad Enterprise
|
69.72
|
26/10/2023
|
02/11/2023
|
01/11/2024
|
0
|
0.00
|
0
|
15/10/2024
|
|
93
|
Cox's bazar
|
13
|
moheskhali
|
126
|
824
|
UIIP-BC/PCO/W-410
|
A) Construction of RCC Box Culvert (1.20 m x 2.00m) at Azizur Rahaman Road Near House of Siraj mea Word No:-07 Under Moheshhkali Pourashava District:Coxs Bazer.
B) Construction of RCC Box Culvert (1.20m x 2.00m) at Bara Rakain Para Main RoadWard No:-04 Under Moheshhkali Pourashava District: Coxs Bazer.
C) Construction of RCC Box Culvert (1.20m x 2.00m) at Lal Mohammed Sikder Connecting Road Near Moheshkhali Collage Ward No:-03 Under Moheshhkali Pourashava District:Coxs Bazer.
D) Construction of RCC Box Culvert (1.20m x 2.00m) at Lal Mohammed Sikder Connecting Road Near Hospital Pond Ward No:-03 Under Moheshhkali Pourashava District:Coxs Bazer.
|
|
|
8.00
|
|
72.58
|
M/s Asad Enterprise
|
0.00
|
30/10/2022
|
16/11/2022
|
16/11/2023
|
100
|
70.06
|
92
|
15/10/2024
|
|
94
|
Cox's bazar
|
13
|
moheskhali
|
126
|
824
|
UIIP-BC/PCO/W-409
|
Construction of RCC Box Darin from Shota Rakain Para to Fish Ger Under Moheshkhali Pourashava (Cha. 00.00m - 288.00m) Ward No.-04 Under Moheshhkali Pourashava District: Coxs Bazer.
|
|
|
|
|
111.76
|
M/s Asad Enterprise
|
116.88
|
30/10/2022
|
16/11/2022
|
16/11/2023
|
100
|
116.88
|
100
|
15/10/2024
|
|
95
|
Cox's bazar
|
13
|
moheskhali
|
126
|
824
|
UIIP-BC/PCO/W-408
|
A) Improved by RCC from Badaradojja Connecting Road by Gona Para Masjid to Gotivanga Connecting Road,Ward No.-05 (Ch.0.00m-351.00m) Under Moheshhkali Pourashava, District: Coxs Bazer.
B) Improved by RCC from Bara Rakain Para Main Road to Near House of Mongsino Connecting Road, Ward No.-04 (Ch.0.00m - 153.00m) Under Moheshhkali Pourashava, District: Coxs Bazer.
C) Improved by RCC from Bara Rakain Para Main Road to Vinjja Para Ghat Connecting Road Ward No.-04 (Ch.0.00m - 175.00m) Under Moheshhkali Pourashava, District:Coxs Bazer.
D) Re-Construction of Janata Bazar Connecting Road to near of Wear House Bara Rakin Para Bodda Mondir Road (Ch:0.00m-170.00m) Ward No.-07 under Under Moheshhkali Pourashava, District: Coxs Bazer.
E) Re-Construction of Janata Bazer Connecting Road to Shipahir Para Bridge Bainner Bokan Connecting Road (Ch:0.00-573.00m), Ward No.-07, Under Moheshhkali Pourashava, District:Coxs Bazer.
|
|
1.42
|
|
|
177.23
|
M/s Asad Enterprise
|
185.38
|
30/10/2022
|
16/11/2022
|
30/05/2024
|
80
|
145.18
|
78
|
15/10/2024
|
|
96
|
Cox's bazar
|
13
|
moheskhali
|
126
|
824
|
UIIP-BC/PCO/W-351
|
A) Improved by RCC at from Gorakgata Jip Station by Lamongsa Jowelers to Near House of Donjia, Word No-04 Under Moheskhali Pourashava. ( Ch: 0.00-400.00m)
B) Improved by RCC at from Sojal store to Near House of Salamong, W-04, Under Moheskhali Pourashava. ( Cha.0.00-280.00m)
|
|
0.66
|
|
|
120.59
|
Hasan Enterprise
|
119.95
|
14/06/2023
|
15/06/2023
|
18/06/2024
|
78
|
81.94
|
68
|
15/10/2024
|
|
97
|
Cox's bazar
|
13
|
moheskhali
|
126
|
824
|
UIIP-BC/PCO/W-350
|
A) Improved by RCC at from Joladash Para Pond West Embankment to Goraggata Bazar Connecting Raod, W-07 Under Moheskhali Pourashava. (Ch.00.00m - 65.00m). (Salvage Amount: 15300)
B) Improved by RCC of at from Uttar Rakain para Mondir Boddamondir Gate to Vinjja para Bridge Connecting Road ,W-04, Under Moheskhali Pourashava. (Ch.00.00m - 220.00m). (Salvage Amount: 179540.00
C) Improved by RCC at From Char Para Main Road to See Beatch Connecting Road ( Ch: 0.00-340.00m)in Word No-04 Under Moheskhali Pourashava. (Salvage Amount: 4633.00). (Total Slavage: 199473.00
|
|
0.63
|
|
|
110.83
|
Hasan Enterprise
|
109.52
|
14/06/2023
|
15/06/2023
|
18/06/2024
|
100
|
109.35
|
100
|
15/10/2024
|
|
98
|
Cox's bazar
|
13
|
moheskhali
|
126
|
824
|
UIIP-BC/PCO/W-349
|
A) Improved by RCC Of at from Near House of Rafik to majar Para Connecting Road .W-08 Ch.00.00m - 135.00m B) Improved by RCC Of at from Jatty Road by South Rakain para Mondir to Rakain para Inter Connecting East Connecting Raod .W-04 Ch.00.00m - 340.00m335.00m and C) Improved by RCC Pajjip Office to Upazila Connecting Raod in Word-07 Cha. 0.00 m - 90.00m Under Moheshkhali Pourashava District Coxs Bazar
|
|
0.67
|
0.00
|
0.00
|
124.95
|
Kingdom Builders Ltd.
|
118.64
|
14/07/2021
|
28/07/2021
|
14/07/2022
|
100
|
93.39
|
79
|
15/10/2024
|
|
99
|
Cox's bazar
|
13
|
moheskhali
|
126
|
824
|
UIIP-BC/PCO/W-119
|
a)Improved by RCC from Addersh Garam to Pachaim Char para Goll chattar Connecting Road in Word-09 Cha. 0.00 m - 426.00m Under Moheshkhali Pourashava District Coxs Bazar
|
|
0.43
|
0.00
|
0.00
|
83.99
|
M/s Asad Enterprise
|
83.99
|
29/10/2020
|
11/05/2020
|
11/05/2021
|
100
|
83.99
|
100
|
29/09/2022
|
|
100
|
Cox's bazar
|
13
|
moheskhali
|
126
|
824
|
UIIP-BC/PCO/W-118
|
a) Improved by RCC Kaji office to Phal Para Connecting Road in Word-03 Cha. 0.00 m - 246.00m b)Improved by RCC from shota Moheshkhali connecting road to near House of Amir Hossain Connecting Road in Word-03 Cha. 0.00 m - 240.00m
|
|
0.49
|
0.00
|
0.00
|
101.44
|
M/s Asad Enterprise
|
100.97
|
29/10/2020
|
04/11/2020
|
03/11/2021
|
100
|
100.97
|
100
|
29/09/2022
|
|
101
|
Cumilla
|
10
|
chouddagram
|
94
|
824
|
UIIP/PCO/G-44
|
Implementation & Supply 781 nos Waste Basket (120 ltr) & 9 nos Non-motorized vehicle (van) under Chouddagram Pourashava District: Cumilla.
|
|
|
|
1.00
|
39.96
|
RFL Plastrics Limited
|
25.57
|
02/02/2024
|
11/02/2024
|
10/02/2025
|
20
|
0.00
|
0
|
14/10/2024
|
|
102
|
Cumilla
|
10
|
chouddagram
|
94
|
824
|
UIIP-BC/PCO/W-573
|
(A) Improvement of RCC Road work at Dhaka Chittagong Highway to West Bypass Tower West Corner ( Ch.00-375.00m) Link Judge Kaushik Khandikar & Azad Home ( Ch. 00-100.00+00-40)=140.00m Ward no-06. Under Chouddagram PourashavaCumilla
(B) Improvement of RCC Road & RCC Retaining wall at Falgunkora Bhuiyan Jame Mosque Road to H/O Mafigur Rahman Councilor ( Ch.00-199.00m) Ward no-06. Under Chouddagram PourashavaCumilla
(C) Improvement of RCC Road at Ramchandrapur Siddikur Rahman Shop to Dhaka Chittagong Highway Deputy Tax Calculator Office( Ch.00-510.00m) With on Cross Drain at (Ch. 00-m) Ward no-08 & 09 Under Chouddagram PourashavaCumilla
(D) Improvement of RCC Road Baiderkhil Jame Mosque Road to H/O Mahabudul Haque ( Ch.00-95.00m) Ward no-07. Under Chouddagram PourashavaCumilla
|
|
1.32
|
|
|
196.91
|
Aristocratic Construction Firm
|
196.39
|
05/06/2023
|
11/06/2023
|
10/06/2024
|
68
|
107.59
|
55
|
14/10/2024
|
|
103
|
Cumilla
|
10
|
chouddagram
|
94
|
824
|
UIIP-BC/PCO/W-511
|
A) Rehabilitation of RCC Road from Chouddagram Highway Connecting Road in front of Girls School Including Foothpath under Chouddagram PourashavaCumilla (Ch.0.00-25.00m)
B) Construction of Top Slab of Drain at Chandishkara Laksham Road to South side Gazi Bari Road under Chouddagram Pourashava Cumilla (Ch.00-125.00m)
C) Construction of RCC Box Culvert (4.00x3.00m) at Chandishkar on Shorpolona Canel Nearest H/O Journalist Mahbobur Rahman Miazil under Chouddagram PourashavaCumilla. (dropped)
D) Construction of RCC Box Culvert (4.00x3.00m ) at on Kisnochora Canel at Falgunkara West-South side H/O Mano Masterl under Chouddagram PourashavaCumilla.
E) Construction of RCC Box Culvert (4.00x4.00m) at Highwayl Connecting Road in front of Girls School at Ch.15.00m Under Chouddagram PourashavaCumilla.
|
|
0.25
|
9.55
|
|
109.33
|
M/S Patwary Enterprise
|
74.62
|
14/08/2022
|
21/08/2022
|
27/05/2024
|
46
|
21.25
|
28
|
14/10/2024
|
|
104
|
Cumilla
|
10
|
chouddagram
|
94
|
824
|
UIIP-BC/PCO/W-510
|
A) Construction of RCC Road at Chondipur Bypass Road to Graveyard under Chouddagram PourashavaCumilla (Ch.0.00-275.00m)B) Construction of RCC Road at Laxmipur Jame Mosque Road to Ramrygram H/O NSI Kazi Kamal under Chouddagram Pourashava Cumilla (Ch.0.00-295.00m)C) Construction of Protection wall at Laxmipur Jame Mosque Road to Ramrygram H/O NSI Kamal under Chouddagram PourashavaCumilla (Ch.0.00-295.00m) D) Construction of RCC Road at Jayantinagar BC Road to H/O CEO shab under Chouddagram Pourashava Cumilla (Ch. 0.00-130.00m)E) Construction of RCC Drain at Jayantinagar BC Road to H/O CEO shab under Chouddagram Pourashava Cumilla (Ch. 0.00-130.00m)F) Construction of RCC Drain at Laximipur Eidga to H/O khalill Miha under Chouddagram Pourashava Cumilla (Ch.0.00-107.00m)G) Construction of RCC Box Culvert (2.00x2.00m) at Joyantynagar GPS Road Nearest Highway at Ch.10.00m under Chouddagram Pourashava Cumilla.
|
|
1.00
|
2.50
|
0.00
|
113.23
|
M/s Patwary Enterprise
|
100.87
|
07/07/2022
|
11/07/2022
|
10/07/2023
|
97
|
76.83
|
76
|
14/10/2024
|
|
105
|
Cumilla
|
10
|
chouddagram
|
94
|
824
|
UIIP-BC/PCO/W-509
|
A) Constraction of RCC Road at Pachra Monshibari road under Chouddagram PourashavaCumilla (Ch.0.00-305.00m) B) Construction of Retaining wall at Pachra Monshibari Road under Chouddagram Pourashava(Ch.230.00- 300=70.00m))C) Construction of RCC Road at Natapara(East) H/O Kala Mia to Hoddar Pond under Chouddagram PourashavaCumilla (Ch.0.00-242.00m)D) Construction of RCC Road at Chandishkara Laksham Road to North Side of H/O Hazi Yousuf & Md. Ismail under Chouddagram Pourashava Cumilla (Ch.0.00-165.00m)E) Construction of RCC Drain at King Sreeour Kacha Bazer to Asho shah Fakir Mazer under Chouddagram PourashavaCumilla (Ch.0.00-263.00m)F) Construction of RCC Drain at Falgunkhara H/O Arob Mulla to North Side Canal under Chouddagram Pourashava Cumilla (Ch.508.00-577.00m=69.00m
|
|
0.78
|
0.00
|
0.00
|
142.18
|
M/s Rafiq Traders
|
127.84
|
07/07/2022
|
11/07/2012
|
10/07/2023
|
52
|
52.98
|
41
|
14/10/2024
|
|
106
|
Cumilla
|
10
|
chouddagram
|
94
|
824
|
UIIP-BC/PCO/W-264
|
(A)(ROAD -BC) Rehabilitation of Road by BC of Chouddagram H.J gov.High School Main Road Under Chouddagram Pourashava,Comilla.( Ch.00-150.00m)( B) ( Retaining wall ) Rehabilitation of Chouddagram H.J Gov.High School Main Road Under Chouddagram Pourashava,Comilla.( Ch.00-150.00m)( c) Construction of RCC Drain at H.J High School Road Side Under Chouddagram Pourashava,Comilla.( Ch.00-130.00m)( D) Construction of RCC Main Drain from H.J Gov.High School Play Ground to South Side Shorpolona Canel Under Chouddagram Pourashava,Comilla.( Ch.00-25.00m)( D) Construction of RCC Main Drain from H.J Gov.High School Play Ground to South Side Shorpolona Canel Under Chouddagram Pourashava,Comilla.( Ch.00-25.00m)( E) (Road-RCC)Construction of RCC Road at Chouddagram H.J Gov.High School Road Under Chouddagram Pourashava,Comilla.( Ch.00-520.00m)
|
|
0.82
|
0.00
|
0.00
|
149.31
|
M/S. Tuhin Brothers
|
133.38
|
18/07/2021
|
25/07/2021
|
30/06/2022
|
100
|
132.43
|
100
|
14/10/2024
|
|
107
|
Cumilla
|
10
|
chouddagram
|
94
|
824
|
UIIP-BC/PCO/W-263
|
(1) (ROAD) Improvement of a Road at Panchr House of Kader Mmember to House of Saiful Counselor under Chouddagram Pourashava,Cumilla (Ch.235.500m)(1) (CROSS DRAIN) Improvement of a Road at Panchr House of Kader Mmember to House of Saiful Counselor under Chouddagram Pourashava,Cumilla (Ch.235.500m)(3) (ROAD) Constructionof RCC Road for Chouddagram Upazila Porishod Under Chouddagram Pourashava,Cumilla.( Ch.00-80.00m)( 4) ( Rataining Wall) Construction of RCC Retaining wall at nearest in front of Chouddagaram Upazila Porishod Road Side Under Chouddagram Pourashava ,Cumilla( Ch.0.00-80.00m)( 5) ROAD-BC) Improvement of a Road From Dhaka-Chittagong Highway to Falgunkara Chowdhury Bari Road under Chouddagram Pourashava,Cumilla( Ch.00-510.00m)( 6) ( Road-R.C.C) Construction of R.C.C Road at South Falgunkara Road to house of Chowdhury Bari under Chouddagaram Pourashava,Cumilla( ch.00-96.00m)(7) Construction of RCC road at Chandishkara Laksum Road to Towards north side house of Shekh of Abdur Rahman under Chouddagram Pourashava Cumilla (Ch: 00-262.00m
|
|
1.26
|
0.00
|
0.00
|
109.72
|
M/S. Tuhin Brothers
|
102.05
|
27/09/2021
|
04/10/2021
|
08/05/2022
|
100
|
62.55
|
79
|
14/10/2024
|
|
108
|
Cumilla
|
10
|
chouddagram
|
94
|
824
|
UIIP-BC/PCO/W-265
|
( A) Construction of RCC Drain at King Sreepur High School Road from house of Abdul Mannan to west side Culvert Under Chouddagram Pourashava,Comilla.( Ch.694-904.00m)( B) Construction of RCC Road at Sreepur West Bypass Road to West Side House of Chan Miah Under Chouddagram Pourashava,Comilla.( Ch.00-320.00m)( c) Construction of RCC Drain at Sreepur West Bypass Road to West Side House of Chan Miah & Jamal Under Chouddagram Pourashava,Comilla.( Ch.30-230.00m)( D) Improvement of West Dhonmuri Road to House of Advocat Shiraz Nearest Chatitola Road at Sreepur West Bypass Road to West Side House of Chan Miah Under Chouddagram Pourashava,Comilla.( Ch.00-300.00m)
|
|
|
0.00
|
0.00
|
100.49
|
M/S. Tuhin Brothers
|
93.34
|
18/07/2021
|
25/07/2021
|
30/06/2022
|
100
|
47.88
|
51
|
29/09/2022
|
|
109
|
Cumilla
|
10
|
chouddagram
|
94
|
824
|
UIIP-BC/PCO/W-82
|
(A)B1-( Drain) Construction of R.C.C Drain From Baidderkhi house of Habu Miah to North Side Canel under Chouddagram Pourashava,Cumilla. ( Ch.0.00-280.00 M )( B) C1-(Road -BC) Improvement of a Road from Dhaka-Chittagong Highway to East Dhonmuri BC Road under Chouddagram Pourashava,Cumilla. ( Ch.600-1310.00m)(C) E1-Construction of 2.00m x 2.00m RCC Box Culvert at Pachra Balujuri Road under Chouddagram Pourashava,Cumilla. ( Ch.1050.00M) ( D) E2-Contruction of 2.00m x 2.00 m RCC Box Culvert at Pachra Nearest House of Shamsu Bsc under Chouddagram Pourashava,Cumilla. ( Ch.750.0 M)
|
|
0.71
|
2.00
|
0.00
|
81.06
|
M/S. Kamrul Enterprise
|
83.37
|
28/09/2020
|
05/10/2020
|
05/10/2021
|
100
|
82.99
|
100
|
29/09/2022
|
|
110
|
Cumilla
|
10
|
chouddagram
|
94
|
824
|
UIIP-BC/PCO/W-81
|
(A) A-1( Road) Construction of R.C.C Road at Chandishkara Laksum Road to Towards north West side house of Mizan Moulana under Chouddagram Pourashava,Cumilla . ( Ch.00-270.00 m) ( B).A2-(Retaining wall) Construction of Retaining wall Road Side at Chandishkara Laksum Road to Towards north West side of Mizan Moulana under Chouddagram Pourashava,Cumilla. ( Ch.200-234=34.00 m) ( B).A2-(Retaining wall) Construction of Retaining wall Road Side at Chandishkara Laksum Road to Towards north West side of Mizan Moulana under Chouddagram Pourashava,Cumilla. ( Ch.200-234=34.00 m)(C ) B1-( Road) Construction of R.C.C Road at Chandishkara Shiraz Patowary Bari RCC Road to South side New Mosque Nearest house of Ali Hossain under Chouddagram Pourashava,Cumilla ( Ch.0.00-300.00m)( D) B2-(Drain-1) Construction of Drain at Chandishkara Shiraz Patwory Bari R.C.C Road to south side New Mosque Nearest house of Ali Hossain under Chouddagram Pourashava,Cumilla. ( Ch.0.00-128.00m)( E) B3-(Drain-2) Construction of Drain at Chandishkara Shiraz Patwary Bari RCC Road to south side New Mosque Nearest house of Ali Hossain under Chouddagram Pourashava,Cumilla. ( Ch.0.00-45.00m) ( G) A2- ( Drain)Construction of Drain at Noapara East bypass Road to house of Driver Ali Hossain underChouddagram Pourashava,Cumilla. ( Ch.00-254.00m)( H) B1-( Road) Construction of HBB Road at Highway Side from Ramchandrapur BICIS Road to South Side Shop of Nurul Amin under Chouddagram Pourashava,Cumilla. ( Ch.2320.00-2950.00m) ( I) B2-Construction of 4.00m x3.00m RCC Box Culvert in on Mitalla Cannel under Chouddagram Pourashava,Cumilla ( Ch.2550.00 m)
|
|
1.48
|
4.00
|
0.00
|
182.73
|
M/S.Hoque Traders
|
182.22
|
28/09/2020
|
05/10/2020
|
05/10/2021
|
100
|
147.16
|
81
|
29/09/2022
|
|
111
|
Cumilla
|
10
|
homna
|
81
|
824
|
UIIP/PCO/G-45
|
Implementation & Supply 765 nos Waste Basket (120 ltr) & 10 nos Non-motorized vehicle (van) under Homna Pourashava District: Cumilla.
|
|
|
|
1.00
|
39.97
|
RFL Plastrics Limited
|
27.22
|
11/01/2024
|
15/01/2024
|
17/04/2024
|
95
|
15.00
|
55
|
14/10/2024
|
|
112
|
Cumilla
|
10
|
homna
|
81
|
824
|
UIIP-BC/PCO/W-630
|
Construction Of single Storied Vegetables and Agricultural products Market on 5 storied Foundation At Homna Pourashava,Cumilla.(Floor Area=314 sqm)
|
|
|
|
1.00
|
99.56
|
M/S Shahid Traders
|
104.54
|
24/07/2023
|
31/07/2023
|
30/07/2024
|
76
|
49.67
|
48
|
14/10/2024
|
|
113
|
Cumilla
|
10
|
homna
|
81
|
824
|
UIIP-BC/PCO/W-576
|
Improvement of BC road from starting from Srimoddi Bazar Mosjid moar to Latia road Anu Miahbari existing RCC road (Ch.00-795.00m) under Homna Pourasha,Cumilla.
|
|
0.80
|
|
|
32.98
|
M/S Modina Construction
|
32.37
|
16/05/2023
|
23/05/2023
|
22/05/2024
|
50
|
0.00
|
0
|
14/10/2024
|
|
114
|
Cumilla
|
10
|
homna
|
81
|
824
|
UIIP-BC/PCO/W-420
|
Rehabilitation of BC Road by RCC Road starting from Homna Old Bus Stand Over Bridge to East Srimoddi Eidgah in ward No-05 & 06 under Homna Pourashava (Ch.820-2000m).
|
|
1.18
|
|
|
152.48
|
M/S Modina Construction
|
152.47
|
30/06/2022
|
07/07/2022
|
06/07/2023
|
100
|
151.76
|
100
|
14/10/2024
|
|
115
|
Cumilla
|
10
|
homna
|
81
|
824
|
UIIP-BC/PCO/W-497
|
A) Construction of RCC Road starting from Bagmara-Kalmina Road to Graveyard existing pacca Road (Ch.0.00-155m) ward No.09 under Homna Pourashava. B) Construction of RCC Drain starting from REB Mosjid Road Hazrat Ali Bari moar to REB Office existing Drain (Ch.0.00-180m) ward No.04 under Homna Pourashava.C) Construction of 03 (Three) No. Box Culvert ( Size:3.0m x 3.5m x 6.20m) from Bus Stand to Latia Road at Chainage 650m 1600 & 2750m) Under under Homna Pourashava.
|
|
0.16
|
9.00
|
0.00
|
138.97
|
MAM Construction Ltd.
|
132.56
|
29/05/2022
|
06/05/2022
|
06/04/2023
|
80
|
77.41
|
58
|
14/10/2024
|
|
116
|
Cumilla
|
10
|
homna
|
81
|
824
|
UIIP-BC/PCO/W-421
|
Construction of RCC Road starting from Bagmara Madrasha to Homna-Kashipur Road in ward No-02 under Homna Pourashava (Ch.0.00-850m).
|
|
0.85
|
0.00
|
0.00
|
96.18
|
M/S. Lockman Hossain
|
96.18
|
29/05/2022
|
06/05/2022
|
06/04/2023
|
100
|
96.10
|
100
|
14/10/2024
|
|
117
|
Cumilla
|
10
|
homna
|
81
|
824
|
UIIP-BC/PCO/W-229
|
Construction of RCC Road starting from A) Homna Post Office Mour to Old Bus Stand Bridge approach via Homna Bazar ( Ch.00-712m). B) A 1 Rashid Plaza corner to Homna Thana Gate in ward no 04 & 05 under Homna Pourashava ( ch.00-48m)
|
|
0.76
|
0.00
|
0.00
|
153.23
|
M/S. Zaman Traders
|
71.57
|
15/06/2021
|
22/06/2021
|
21/12/2021
|
100
|
145.48
|
100
|
14/10/2024
|
|
118
|
Cumilla
|
10
|
homna
|
81
|
824
|
UIIP-BC/PCO/W-74
|
( a)Rehabilitation & Widening of BC road starting from Homna Post Office moar to Raj gat in ward No-04 ( Ch.00-700m) ( b) Construction of RCC Road starting from Rehana Mojid Mohila Collage to Motin Shop via Mostafa bari Graveyard in Ward No-03 & 04 ( Ch.00-470) ( c) Rehabilitation of BC Road starting from Homna Adrashapara Ghatla to Homna-Kashipur road in ward No-03 ( Ch. 800-1+820m)
|
|
2.17
|
0.00
|
0.00
|
152.93
|
M/S Modina Construction
|
152.89
|
02/11/2020
|
09/11/2020
|
25/05/2022
|
100
|
151.03
|
100
|
14/10/2024
|
|
119
|
Cumilla
|
10
|
homna
|
81
|
824
|
UIIP-BC/PCO/W-230
|
(a)Construction of RCC Drain starting from Homna Degree College Bridge East Side to Titas River via BRDB Godown ( L-410.00 m) under Homna Pourashava & Link Goal Bari Bridge ( L-108.00 m) in ward No-05, under Homna Pourashava. ( b)Construction of RCC Drain Starting from Bagmara Bazer to Alipur Canal via Bagmara Madrasha ( L-705.00 m) in ward No-02 ,under Homna Pourashava. ( c) Construction of RCC Drain Starting from Homna Sadar from Homna Sadar Hospital Gate to Post Office moar existing drain ( L-170.00 m) in ward No-04, under Homna Pourashava.
|
|
|
0.00
|
0.00
|
210.83
|
M/S. Zaman Traders
|
200.08
|
15/06/2021
|
22/06/2021
|
21/12/2021
|
100
|
143.11
|
72
|
29/09/2022
|
|
120
|
Cumilla
|
10
|
homna
|
81
|
824
|
UIIP-BC/PCO/W-75
|
(a)Construction of RCC Road starting from Pourashava Office road to Existing Horipur via Homna Kanda Eidgah in ward No-03( Ch.00.00-891.00m) ( b) Rehabilitation of BC Road starting from Homna East Srimoddi Eidgag to Srimoddi Lanchgat in ward No-06,07 & 08( Ch.2+000-4+550 m).
|
|
2.89
|
0.00
|
0.00
|
147.57
|
MAM Construction Ltd.
|
143.14
|
03/08/2020
|
10/08/2020
|
09/08/2021
|
100
|
143.01
|
100
|
29/09/2022
|
|
121
|
Cumilla
|
10
|
nangalkot
|
97
|
824
|
UIIP/PCO/G-46
|
Implementation & Supply 765 nos Waste Basket (120 ltr) & 10 nos Non-motorized vehicle (van) under Nangolkot Pourashava District: Cumilla.
|
|
|
|
1.00
|
39.97
|
RFL Plastrics Limited
|
29.98
|
10/03/2024
|
10/03/2024
|
09/06/2024
|
60
|
15.00
|
50
|
15/10/2024
|
|
122
|
Cumilla
|
10
|
nangalkot
|
97
|
824
|
UIIP-BC/PCO/BCO/W-546
|
(A) Construction of One Storied Vegetable & Agricultural Product Market (Floor Area=145.00 sqm) under Nangalkot Bazar
(B) Construction of One Storied Public Toilet Building (Type A=56 sqm) Under Nangalkot Bazar
(C) Construction of Shed For Public Transport Passenger (28.00 sqm) Nangalkot Bus Stant
|
|
|
|
3.00
|
115.36
|
MMC-MST (JV)
|
125.97
|
31/05/2023
|
07/06/2023
|
06/06/2024
|
51
|
37.16
|
29
|
15/10/2024
|
|
123
|
Cumilla
|
10
|
nangalkot
|
97
|
824
|
UIIP-BC/PCO/BCO/W-513
|
Construction of RCC drain front of Nangalkot Poura Bhaban (Ch.0.00-875.00m) under Nangalkot Pourashava Cumilla.
|
|
|
0.00
|
0.00
|
119.02
|
M/S Modina Construction
|
130.85
|
24/07/2022
|
31/07/2022
|
30/07/2023
|
77
|
78.35
|
60
|
15/10/2024
|
|
124
|
Cumilla
|
10
|
nangalkot
|
97
|
824
|
UIIP-BC/PCO/BCO/W-499
|
Improvement of road from Mahini and Bazar Road to Anwar Kausar AC Land office Teacher Training Center Road (Ch.00-481.00m) by RCC under Nangalkot Pourashava.
|
|
0.48
|
0.00
|
0.00
|
63.57
|
M/S Shalaha Traders
|
69.25
|
24/06/2022
|
07/01/1900
|
30/06/2023
|
85
|
57.14
|
83
|
14/10/2024
|
|
125
|
Cumilla
|
10
|
nangalkot
|
97
|
824
|
UIIP-BC/PCO/BCO/W-498
|
Improvement of road from bypass road to Rail Station road & Police Station via B.B Chattar (Ch.00-470.00m) under Nangalkot Pourashava.
|
|
0.47
|
0.00
|
0.00
|
118.48
|
M/S Azam & Saiham Traders
|
128.85
|
24/06/2022
|
01/07/2022
|
30/06/2023
|
100
|
128.15
|
100
|
14/10/2024
|
|
126
|
Cumilla
|
10
|
nangalkot
|
97
|
824
|
UIIP-BC/PCO/BCO/W-512
|
A) Construction of RCC drain beside Nangalkot to Dhalua Road (Ch.0.00-627.00m) under Nangalkot Pourashava Cumilla.B) Construction of RCC drain beside Sreekamta Pucca Road (Ch.0.00-51.00m) under Nangalkot Pourashava Cumilla.
|
|
|
0.00
|
0.00
|
95.88
|
M/S Modina Construction
|
105.41
|
24/07/2022
|
31/07/2022
|
30/07/2023
|
0
|
0.00
|
0
|
29/09/2022
|
|
127
|
Cumilla
|
10
|
nangalkot
|
97
|
824
|
UIIP-BC/PCO/BCO/W-190
|
Improvement of Road from Betagaon-Atakora Road to Sreehashya road (Ch. 0.00-1+490Km) under Nangolkot Pourosava.
|
|
1.49
|
0.00
|
0.00
|
142.75
|
M/S Nur Ayesha Traders
|
142.72
|
17/01/2021
|
|
23/01/2021
|
100
|
108.83
|
76
|
29/09/2022
|
|
128
|
Cumilla
|
10
|
nangalkot
|
97
|
824
|
UIIP-BC/PCO/BCO/W-189
|
1. Improvement of Road from Dayemchati Bazar to Ludua Road (Ch. 0.000-0+790m) by BC under Nangalkot Porosava2. Construction of X Drain 6.00mx 1.00x1.00m on Dayemchati bazar to Ludia road3. Construction of 1x3.0x3.0m RCC Culkvert on Asawdia road (road way 5.00m)
|
|
0.79
|
1.00
|
0.00
|
77.55
|
M/S Modina Construction
|
77.54
|
13/01/2021
|
|
19/01/2021
|
100
|
77.35
|
100
|
29/09/2022
|
|
129
|
Cumilla
|
10
|
nangalkot
|
97
|
824
|
UIIP-BC/PCO/BCO/W-188
|
Improvement of Road from Sreekamta pucca road to Poura boundary via Lucky's house (Ch. 0.11-0.900m) under Nangalkot Porosava
|
|
0.90
|
1.00
|
0.00
|
118.28
|
M/S Saidul Enterprise
|
118.21
|
17/01/2021
|
24/01/2021
|
23/01/2022
|
100
|
117.19
|
99
|
29/09/2022
|
|
130
|
Cumilla
|
10
|
nangalkot
|
97
|
824
|
UIIP-BC/PCO/W-57
|
Improvement of road at Bot tola (Laksam rd. Mahin rd. Sreefolia rd. & Hospital road) (L-635.00m) by RCC
|
|
0.64
|
0.00
|
0.00
|
270.41
|
MMC-MST (JV) Nagalkot Bazar
|
270.43
|
10/01/2020
|
10/04/2020
|
30/09/2021
|
100
|
270.41
|
100
|
29/09/2022
|
|
131
|
Dhaka
|
24
|
savar
|
176
|
824
|
UIIP-BC/PCO/W-621
|
Improvement of RCC Road starting from Ganda Mr. Roton Matbor Store to Engr. Abul Kalam Azad house in ward no-09, Savar Pourashava, Savar Dhaka
|
|
|
|
|
21.94
|
|
0.00
|
|
|
|
0
|
0.00
|
0
|
17/10/2024
|
|
132
|
Dhaka
|
24
|
savar
|
176
|
824
|
UIIP-BC/PCO/W-619
|
Improvement of BC road at starting from Dhaka-Aricha Road Chourongi Super Market to Rajasion Vission Garments in ward no-08 under Savar Pourashava ( Ch.30.00-2565.00m) Salvage Amount=6,24,461.00)
|
|
2.54
|
|
|
301.32
|
Shikder Builders
|
264.86
|
17/02/2024
|
18/02/2024
|
17/02/2025
|
45
|
259.38
|
100
|
17/10/2024
|
|
133
|
Dhaka
|
24
|
savar
|
176
|
824
|
UIIP-PCO/BCO/W-471
|
1.Construction of RCC u-Drain Starting from Dhaka-Aricha high way near Talbag Grave yeard to Thana road near woman collage. (Ch- 0.00+000-0+215.00m), in ward no - 06, SavarPourashava, Savar, Dhaka. 2.Improvement of RCC Road from Dhaka-Aricha high way near Talbag Grave yeard to Thana road near woman collage. (Ch- 0.00+000-0+215.00m), in ward no - 06, SavarPourashava, Savar, Dhaka.
|
|
0.22
|
0.00
|
0.00
|
75.00
|
Buildex & MNC (JV.)
|
64.52
|
24/04/2022
|
07/05/2022
|
28/04/2023
|
100
|
59.49
|
100
|
17/10/2024
|
|
134
|
Dhaka
|
24
|
savar
|
176
|
824
|
UIIP-PCO/BCO/W-470
|
Construction of RCC Drain with slab at starting from Dhaka-Aricha Road JamanTreders(Near Rana Plaza) to RobindronathBabu to Mojidpur Road Mridha Bari. (ch-0.00-235.00 m)
2.Construction of R.C.C Road at starting from Dhaka-Aricha Road JamanTreders(Near Rana Plaza) to RobindronathBabu to Mojidpur Road Mridha Bari. (ch-0.00-235.00 m)
|
|
0.24
|
0.00
|
0.00
|
72.71
|
M/S JAHAN ENTERPRISE
|
62.89
|
24/04/2022
|
07/05/2022
|
28/04/2023
|
100
|
56.33
|
100
|
17/10/2024
|
|
135
|
Dhaka
|
24
|
savar
|
176
|
824
|
UIIP-PCO/BCO/W-469
|
Construction of RCC Drain with slab at starting from Kotbari Kamal Garments Road Kobba Mosque to Balumath to Paramount school in ward no - 02, SavarPourashava, Savar, Dhaka. (Ch. 0.00-345.00m)
Construction of R.C.C Road at starting from Kotbari Kamal Garments Road Kobba Mosque to Balumath to Paramount school in ward no - 02, SavarPourashava, Savar, Dhaka. (Ch. 0.00-345.00m)
|
|
0.35
|
0.00
|
0.00
|
120.46
|
G2G Tech Limited
|
104.21
|
24/04/2022
|
07/05/2022
|
28/04/2023
|
100
|
98.33
|
100
|
17/10/2024
|
|
136
|
Dhaka
|
24
|
savar
|
176
|
824
|
UIIP-BC/PCO/W-215
|
1) Improvement of RCC road at Banpukar Main road joynal abedin house to kamal garments road (Ch. 0.00+000-0+505.00m) & Partly Drain top slab, in ward no - 03, Savar, Pourashava, Dhaka2) Improvement of RCC road starting from rajashoin Palowan para more to house to sufia bakary in w and no - 08, Savar Pourashava, Savar, Dhaka (Ch. 0.00+000-0+525.00m)
|
|
1.03
|
0.00
|
0.00
|
160.93
|
M/S JAHAN ENTERPRISE
|
141.07
|
26/11/2020
|
03/12/2020
|
25/05/2021
|
100
|
141.02
|
100
|
17/10/2024
|
|
137
|
Dhaka
|
24
|
savar
|
176
|
824
|
UIIP-PCO/BCO/W-468
|
1.Construction of RCC Drain with slab at starting from Nama Bazar Jet Ghat Road to KheyaGhatFokirstore in ward no - 02, SavarPourashava, Savar, Dhaka. (Ch. 0.00-205.00m) 2.Construction of R.C.C Road at starting from Nama Bazar Jet Ghat Road to KheyaGhatFokir store in ward no -02, SavarPourashava, Savar, Dhaka. (Ch. 0.00-205.00m) 3.Construction of RCC Drain with slab at starting from Nama Bazar Banjaramraic via taramollah to bongsirever (Ch. 0.00-75.00m) & Link-1-tara mollah-vandary (Ch. 0.00-50.00m) & link-2,4,5,6 (Link-2,4,5,6-Ch. 0.00-18.75m x 4= 75.00m) in ward no -02, SavarPourashava, Savar, Dhaka. 4.Construction of R.C.C Road at starting from Nama Bazar Banjaramraic via taramollah to bongsirever (Ch. 0.00-75.00m) & Link-1-tara mollah-vandary (Ch. 0.00-50.00m) & R.C.C Road at link-2,4,5,6 (Link-2,4,5,6-Ch. 0.00-18.75m x 4= 75.00m) in ward no - 02, SavarPourashava, Savar, Dhaka.5.Construction of RCC Drain with slab at starting from Nama Bazar Jonu store to Bongsi River in ward no - 02, SavarPourashava, Savar, Dhaka. (Ch. 0.00-105.00m)
|
|
0.41
|
0.00
|
0.00
|
165.18
|
M/S JAHAN ENTERPRISE
|
142.88
|
28/04/2022
|
07/05/2022
|
28/04/2023
|
0
|
0.00
|
0
|
29/09/2022
|
|
138
|
Dhaka
|
24
|
savar
|
176
|
824
|
UIIP-BC/PCO/W-216
|
(1) Improvement of RCC Road Starting from Moddah Rajashion Eidgah more to Soleman Mosque, in w ard no - 08, Savar Pourashava, Savar, Dhaka. (Ch. .00+000-0+600.00m)(2) Construction of RCC Road & Brick Drain up with slab from Savar south para Ad. Usuf shaheb's house to Chandon babu house in ward no-04, Savar Pourashava, Savar, Dhaka. (Ch. 0.00+000-0+301.00m), in ward no-04, Savar Pourashava, Savar, Dhaka.
|
|
0.90
|
0.00
|
0.00
|
141.36
|
M/S JAHAN ENTERPRISE
|
122.29
|
26/11/2020
|
03/12/2020
|
30/06/2021
|
100
|
104.39
|
85
|
29/09/2022
|
|
139
|
Dhaka
|
24
|
savar
|
176
|
824
|
UIIP-BC/PCO/W-214
|
1) Construction of RCC raod starting form Chapain road ala uddin charman market to dogomora house ara house via samad molla house in w and no-07, savar pourashava, savar, dhaka (Ch. 0.00+000-0.250.00m)2) Construction of RCC road & Vertical extension of Brick drain with slab from bank colony alom shaheb house to thana road mohila college via treepti chanachur more, in ward no -05, Savar pourashava, Savar, Dhaka, (Ch. 0.00+000-0+250m)
|
|
0.50
|
0.00
|
0.00
|
87.33
|
Raka Enterprise
|
75.10
|
26/07/2020
|
03/08/2020
|
03/08/2021
|
100
|
63.47
|
84
|
29/09/2022
|
|
140
|
Dhaka
|
24
|
savar
|
176
|
824
|
UIIP-BC/PCO/W-71
|
Improvement of R.C.C Road Starting from Imandipur chowrasta mor to Khokon Traders more ch.0600-1350m via councilor house at UpazilaSAVARward no 07 under savar pourashava.
|
|
0.75
|
0.00
|
0.00
|
127.36
|
M/S Kofil Enterprise
|
112.00
|
26/07/2020
|
02/08/2020
|
01/08/2021
|
100
|
101.04
|
90
|
29/09/2022
|
|
141
|
Dhaka
|
24
|
savar
|
176
|
824
|
UIIP-BC/PCO/W-70
|
A) Construction of RCC Road Starting from Care Bridge to Mohendra ghosh shop in w ard no - 02 Savar Pourashava Savar Dhaka. Ch. 0.00000-0200.00m232672-20-20008
B) Improvement of DBC & RCC Road Starting from Jamsing Nobin Market to Joypara Hasmot Alis house Ch. 0.00000-0500.00m. Link-1 North Jamsing Samsul Aloms hose to Hazi Md. Momtaz Uddin house Ch. 0.00000-0295.00m in ward no - 01 Savar Pourashava Savar Dhaka.
|
|
1.00
|
0.00
|
0.00
|
129.42
|
M/S Sumon Enterprise
|
100.80
|
26/07/2020
|
04/08/2020
|
31/08/2022
|
100
|
58.82
|
58
|
29/09/2022
|
|
142
|
Dinajpur
|
58
|
birganj
|
436
|
824
|
UIIP-BC/PCO/W-371
|
A) Improvement of Rd. at South Mushidhat, Jalals (UP Chairman) Husking Mill. – res. of Sazen Mistri. Ch.00-415.00 m (Ward No. 09)
B) Improvement of Model School Rd. Rampur road – Mushidhat Model School. Ch.00-300.00 m & link Model School-Chirar mill Ch.00-310.00 m (Ward No. 09)
C) Construction of RCC Rd. at Kamar Para, Mr. Sattar Res. – Mr. Mokbul Res27 Ch.00-200.00 m (Ward No. 09)
|
|
1.23
|
0.00
|
0.00
|
115.69
|
S.M.A Moin
|
90.84
|
22/12/2021
|
|
21/12/2022
|
97
|
40.01
|
45
|
29/09/2022
|
|
143
|
Dinajpur
|
58
|
birganj
|
436
|
824
|
UIIP-BC/PCO/W-370
|
A. Construction of RCC Road at Haliport para Hospital road Mr. kalu res. Ch. 00-300.00 m Ward No. 06 B. Improvement of Rd. at Station para Station Gate LSD Godown. Ch. 00-200.00 m & Link LSD Godown-Nur Alom res. Ch200.00-300.00 Ward No. 06 C. Improvement of Malipara Rd. Suvol Chandra Biswas res. Sonali Husking Mill. Ch. 00-825.00 m & Link Mondir-Rail Gate Bazar Ch.00-215.00m Ward No. 07
|
|
1.64
|
0.00
|
0.00
|
107.22
|
M/S Khan Enterprise
|
88.04
|
26/01/2022
|
02/02/2022
|
25/01/2023
|
98
|
80.00
|
91
|
29/09/2022
|
|
144
|
Dinajpur
|
58
|
birganj
|
436
|
824
|
UIIP-BC/PCO/W-369
|
A) Improvement & Rehabilitation of Rd. at Shahpara, Dhontola GPS – res. of Mr. Abdul Based. Ch.00-1100.00 m (Ward No. 05) B) Improvement of Rd. at Dhontola Dafaderpara, Kaharol road – Iqbal Hosain Res27 Ch.00-165.00 m (Ward No. 05)
|
|
1.27
|
0.00
|
0.00
|
74.36
|
Md.Mahibul Islam
|
70.66
|
30/06/2022
|
07/07/2022
|
29/06/2023
|
10
|
0.00
|
0
|
29/09/2022
|
|
145
|
Dinajpur
|
58
|
birganj
|
436
|
824
|
UIIP-BC/PCO/W-368
|
A) Improvement & Rehabilitation of Rd. at Garuhati, Madrasa road – Doyal Vander. Ch.00-512.00 m (Ward No. 03) B) Improvement of Rd. at School road, School road Mosque – Thana Rd27 Ch.00-200.00 m with RCC Box drain Ch.00-300.00m (Ward No. 03)
|
|
0.51
|
0.00
|
0.00
|
86.47
|
S.M.A Moin
|
64.26
|
22/12/2021
|
29/12/2021
|
21/12/2022
|
98
|
34.19
|
54
|
29/09/2022
|
|
146
|
Dinajpur
|
58
|
birganj
|
436
|
824
|
UIIP-BC/PCO/W-367
|
A) Improvement & Rehabilitation of Rd. at Vorora, Shahabuddin Store – Doyal Bihaga Rd27 Ch.00-600.00 m (Ward No. 01) B) Improvement of Rd. at Shah Mukdumpara, Manik Auto – Rafiqul Husking Mill. Ch.00-618.00 m with RCC box drain, Ch. 00-300.00m (Ward No. 02)
|
|
|
0.00
|
0.00
|
83.50
|
M/S Khan Enterprise
|
68.59
|
22/12/2021
|
29/12/2021
|
21/12/2022
|
98
|
32.95
|
48
|
29/09/2022
|
|
147
|
Dinajpur
|
58
|
birganj
|
436
|
824
|
UIIP-BC/PCO/W-239
|
a) RCC Drain at Melagachi, Bottola – T&T Rd. Culvert, ch.00- 380.00 m (Ward No. 08).
|
|
|
0.00
|
0.00
|
52.27
|
Ali Construction
|
54.52
|
04/02/2021
|
11/02/2021
|
09/02/2022
|
100
|
54.52
|
100
|
29/09/2022
|
|
148
|
Dinajpur
|
58
|
birganj
|
436
|
824
|
UIIP-BC/PCO/W-238
|
a) RCC Drain at Jharbari, Upazilla Rd.(Chartola) – Rail Bridge, ch.00- 720.00 m (Ward No. 06).
|
|
|
0.00
|
0.00
|
116.91
|
M/S Khan Enterprise
|
121.62
|
04/02/2021
|
11/02/2021
|
30/06/2022
|
97
|
105.19
|
87
|
29/09/2022
|
|
149
|
Dinajpur
|
58
|
birganj
|
436
|
824
|
UIIP-BC/PCO/W-237
|
A.Improvement & Rehabilitation of Rd at Malipara Malipara Rail Gate to Suger Mill Club. Ch0.00-1600.00 m, Ward No-07/08.
B. Improvement & Rehabilitation of Rdat Malagachi Bottola- T&T Rd Culvert, Ch0.00-380m, Ward no-08.
C. Improvement & Rehabilitation of Road at Rail Colonipara Shahid Minar-Resof Aley & Res. of Kanti-Res of Akbar,, Ch0.00-360m Ward no-07.
.
|
|
2.34
|
0.00
|
0.00
|
79.39
|
Md Habibur Rahman
|
83.40
|
04/03/2021
|
11/03/2021
|
09/03/2022
|
100
|
83.40
|
100
|
29/09/2022
|
|
150
|
Dinajpur
|
58
|
birganj
|
436
|
824
|
UIIP-BC/PCO/W-236
|
A.Improvement & Rehabilitation of Rd at Karitaspara Nangrakali Mondir-Monipur Ttd. Ch0.00-720.00 m,Ward No06
B.RCC Drain at T&T Road Pirganj Rd-Rail Line, Ch0.00-250m, Ward no-03.
C.Improvement & Rehabilitation of Road at Khalpara LSD Godown-Res of Birganj/ Setabganj Govt. College Principal, Ch0.00-400m Ward no-07&08.
|
|
1.12
|
0.00
|
0.00
|
92.16
|
Md Habibur Rahman
|
96.91
|
04/03/2021
|
11/03/2021
|
09/03/2022
|
100
|
96.90
|
100
|
29/09/2022
|
|
151
|
Dinajpur
|
58
|
birganj
|
436
|
824
|
UIIP-BC/PCO/W-235
|
a) Improvement & Rehabilitation of Rd. at Gopalpur, Gopalpur School more - Bedang more. Ch.00-650.00 m (Ward No. 01)
b) Improvement & Rehabilitation of Rd. at Vorora, Uzzal Husking Mill – Ramdaspara Rd27 Ch.00-300.00 m (Ward No. 01)
c) Improvement & Rehabilitation of Rd. at Azimabad, Abul khayer res. – Thana Rd27 Ch.00-250.00 m (Ward No. 03)
d) Improvement & Rehabilitation of Rd. at Azimabad, Pourashava Gate – Taher more27 Ch.00-310.00 m (Ward No. 03 & 08)
e) RCC Drain at Shahidpara, Belal Master House – Jamal House Ch.00-150.00 m (Ward No. 04)
.
|
|
1.51
|
0.00
|
0.00
|
74.72
|
Md Habibur Rahman
|
78.32
|
04/02/2021
|
|
03/02/2022
|
100
|
78.31
|
100
|
29/09/2022
|
|
152
|
Dinajpur
|
58
|
birganj
|
436
|
824
|
UIIP-BC/PCO/W-107
|
RCC.Drain at Shahidpara,Dhontola GPS-Alehsan School via Cinema hall Road)Ch.680.00-1100.00m,(Ward No.03)&Dhontola GPS-Balapukur More, Ch.680.00-1000.00m(Ward No.05)
|
|
|
0.00
|
0.00
|
104.21
|
M/S BN Bricks
|
104.00
|
10/09/2020
|
17/09/2020
|
09/09/2021
|
100
|
104.00
|
100
|
29/09/2022
|
|
153
|
Dinajpur
|
58
|
birganj
|
436
|
824
|
UIIP-BC/PCO/W-106
|
RCC. Drain at Shahidpara, Upazila Road-Dhontola GPS, Ch.0.00-680m (Ward No-04,05,06)
|
|
|
0.00
|
0.00
|
103.56
|
Md Habibur Rahman
|
103.40
|
10/09/2020
|
17/09/2020
|
09/09/2021
|
100
|
103.40
|
100
|
29/09/2022
|
|
154
|
Dinajpur
|
58
|
hakimpur
|
417
|
824
|
UIIP-BC/PCO/W-500
|
Construction of Shed For Public Transport Passenger (28.00 sqm)
Construction of One-Storied Vegetable & Agricultural Product Market on 5-std Foundation (Floor Area=314.00sqm)
Construction of Public Toilet Building (Type A=56.00sqm)
|
|
|
0.00
|
3.00
|
150.57
|
M/s, Liton Trader's
|
164.06
|
27/06/2022
|
28/06/2022
|
27/06/2023
|
0
|
0.00
|
0
|
29/09/2022
|
|
155
|
Dinajpur
|
58
|
hakimpur
|
417
|
824
|
UIIP-BC/PCO/W-422
|
(a) Construction of RCC road & RCC drain at Barodangapara near Hili-Ghoraghat road to North side start of Pucca road. Ch.0.00~295.00m. Word no.06 under Hakimpur Pourashava. (b) Construction of RCC Drain at Palpara Rana house to adjacent of Hili-Ghoraghat road main drain. Ch. 0.00 ~124m, word no.6 under Hakimpur Pourashava
|
|
0.30
|
0.00
|
0.00
|
78.69
|
M/s, Nazmul Trader's,
|
84.86
|
02/12/2021
|
05/12/2021
|
04/12/2022
|
100
|
84.76
|
100
|
29/09/2022
|
|
156
|
Dinajpur
|
58
|
hakimpur
|
417
|
824
|
UIIP-BC/PCO/W-329
|
(a) Construction of RCC Drain at Uttar Bashudebpur (Master Para) In front of Nazir Mondol house to Sonar potti main drain, Ch. 0+00~0+145km, under ward no. 3
(b) Construction of RCC Drain at Choto Dangapara near Mosque to east side Anishur house low land, Ch. 0+00~0+165km, under ward no. 7
(c.)Construction of RCC Drain at Moddho Bashudebpur Shahid house to in front of Posho hospital culvert. Ch. 0.00~267.00m, under ward no. 4
(d) Construction of 1x3.6mx4.0m RCC Culvert at Choto Jalalpur Hili-Ghoraghat Road North side Link road, Under woard no. 07. under Hakimpur Pourashava, Dinajpur
(e) Construction of 1x3.6mx4.0m RCC Culvert at CP road near Hili charmatha in front of Niaz Ahamed house, Under woard no. 02. under Hakimpur Pourashava, Dinajpur.
(f) Construction of 1x3.6mx4.0m RCC Culvert at Jalalpur Hili-Ghoraghat Road North side near Brack office, Under woard no. 07. under Hakimpur Pourashava, Dinajpur.
|
|
|
10.80
|
0.00
|
141.94
|
M/s, Liton Trader's,
|
151.68
|
03/03/2021
|
10/03/2021
|
09/03/2022
|
100
|
149.33
|
100
|
29/09/2022
|
|
157
|
Dinajpur
|
58
|
hakimpur
|
417
|
824
|
UIIP-BC/PCO/W-328
|
(a) Construction of RCC road at Chandipur Eidgha to east side Sobuj house , Ch. 0+00~0+145km, & Bokul shop to Saidul house Ch. 0+145~0+205 km Under Word no.01.(b) Construction of RCC Drain at Banglahili Bazar Anamul Shop to South side Choripotti more Main Drain. Ch. 0+00km ~0+420km, under ward no. 4
|
|
0.20
|
0.00
|
0.00
|
80.77
|
M/s, Liton Trader's,
|
86.35
|
09/03/2021
|
10/03/2021
|
09/03/2022
|
100
|
86.16
|
100
|
29/09/2022
|
|
158
|
Dinajpur
|
58
|
hakimpur
|
417
|
824
|
UIIP-BC/PCO/W-327
|
(a) Construction of RCC road at Chatni, Hili-Ghoraghat main road near School to south side Aziz house . Ch.0+00~0+190 km, Word no. 09.
(b) Construction of RCC road at Singrapara Infront of Primary School to west side Azidul House. Via Mosque road Ch. 0+00~0+195km, Under Word no.08.
(c') Construction of RCC road at Ismailpur more South side Mozaffar house Ch. 0+00~0+075km, Under Word no.07.
(d) Construction of RCC Drain at Chandipur Razzak house to south side Hili- Ghoraghat road main drain. Ch. 0+00~0+467km, under ward no.1
|
|
0.46
|
0.00
|
0.00
|
130.13
|
M/s, Liton Trader's,
|
139.05
|
04/04/2021
|
04/11/2021
|
10/04/2022
|
100
|
138.37
|
100
|
29/09/2022
|
|
159
|
Dinajpur
|
58
|
hakimpur
|
417
|
824
|
UIIP-BC/PCO/W-326
|
(a) Construction of RCC road with 3 nos cross Drain (L=4m) at Rangamatia main road near in front of Mominul shop to east side Khairul house via Khalil house . Ch.0+00~0+305 km.Word no. 09.
(b) Construction of RCC road with 3 nos cross Drain (L=3 m) at Chatni Charmatha near Nur Mohammad godowan to east side near School via Jamtolimore . Ch.0+00~0+310 km.Word no. 09
(c) Construction of RCC road with 2 nos cross Drain (L=4 m) at Chatni, Hili-Ghoraghat road near Momin shop to south side Amirul house . Ch.0+00~0+075 km. Word no. 09.
(d) Construction of RCC Drain at Uttar bashudebpur near BGB camp to north side CP road main drain, via near culvert in front of Monto Mondol house, Ch. 0+00~0+247 km, under ward no. 3.
(e) Construction of RCC Drain at Dharandha Mofon house to Main drain near Toffazal house, Ch. 0+00~0+045km, under ward no. 2
|
|
0.69
|
0.00
|
0.00
|
139.72
|
M/s, Liton Trader's,
|
149.29
|
04/04/2021
|
04/11/2021
|
10/04/2022
|
100
|
149.27
|
100
|
29/09/2022
|
|
160
|
Dinajpur
|
58
|
hakimpur
|
417
|
824
|
UIIP-BC/PCO/W-167
|
(a) Construction of HBB road at Rangamatia road to Bagmara. Ch.0+00~0+700,L=0.700km under word no. 09
(b) Construction of HBB road at Chatni Taleb house to Chatni Pokuria.Ch.0+00-0+680=0.680 km under word no. 09
('c) Construction of RCC road at Moddho Bashudebpur Moshfik House to west side Rail Station road, Ch. 0+00~0+265km. Under word no. 04
(d) Construction of CC road at Dharandh Ismail Godowan to west side Sherajul house And East Hili-Dinajpur road to Hanif house Ch. 0+00~0+255km. Under word No. 02
.
|
|
1.90
|
0.00
|
0.00
|
106.75
|
Md. Saiful Islam
|
111.49
|
23/08/2020
|
|
22/08/2021
|
100
|
111.24
|
100
|
29/09/2022
|
|
161
|
Dinajpur
|
58
|
hakimpur
|
417
|
824
|
UIIP-BC/PCO/W-166
|
(a) Construction of RCC road at Dhakkin Bashudebpur Hili-Joypurhat road Near Khairul house to east side Mokles house Ch. 0+00~0+315.00m. Under woard No.05
(b) Construction of RCC road at Baro Jalalpur Hili-Ghoraghat road to north side Alhaz Nurul House, Ch. 0+00~0+224km. Under word no. 07
('c) Construction of RCC road at Chatni Hili-Ghoraghat Road to south side Mozir house via Abdul house, Ch. 0+00~0+255km. Under word no. 09
(d) Construction of HBB road at chandipur Charge to Boigram main road. Ch.0+00+745=0.745 km under word no. 01
|
|
225.29
|
0.00
|
0.00
|
108.61
|
Md. Saiful Islam
|
113.66
|
23/08/2020
|
|
22/08/2021
|
100
|
112.18
|
100
|
29/09/2022
|
|
162
|
Dinajpur
|
58
|
hakimpur
|
417
|
824
|
UIIP-BC/PCO/W-50
|
(a) Rehabilitation of BC road at Hili-Ghoraghat road near Chatni Charmatha Bazar to Rangamati more. Ch. 0+00 ~ 2+100 km, Woard no. 09, Under Hakimpur (Hili) Pouradshava.(b) Construction of BC road at LSD Godowan more to Hili Rail station. Ch. 0.000 ~ 350.00m, Woard no.03
|
|
2.45
|
0.00
|
0.00
|
129.84
|
M/s, Liton Trader's,
|
129.66
|
08/07/2020
|
15/07/2020
|
14/07/2021
|
100
|
129.66
|
100
|
29/09/2022
|
|
163
|
Dinajpur
|
58
|
hakimpur
|
417
|
824
|
UIIP-BC/PCO/W-50
|
(a) Rehabilitation of BC road at Hili-Ghoraghat road near Chatni Charmatha Bazar to Rangamati more. Ch. 0+00 ~ 2+100 km, Woard no. 09, Under Hakimpur (Hili) Pouradshava.(b) Construction of BC road at LSD Godowan more to Hili Rail station. Ch. 0.000 ~ 350.00m, Woard no.03
|
|
2.45
|
0.00
|
0.00
|
129.84
|
M/s, Liton Trader's,
|
129.66
|
08/07/2020
|
15/07/2020
|
14/07/2021
|
100
|
129.66
|
100
|
29/09/2022
|
|
164
|
Dinajpur
|
58
|
hakimpur
|
417
|
824
|
UIIP-BC/PCO/W-50
|
(a) Rehabilitation of BC road at Hili-Ghoraghat road near Chatni Charmatha Bazar to Rangamati more. Ch. 0+00 ~ 2+100 km, Woard no. 09, Under Hakimpur (Hili) Pouradshava.(b) Construction of BC road at LSD Godowan more to Hili Rail station. Ch. 0.000 ~ 350.00m, Woard no.03
|
|
2.45
|
0.00
|
0.00
|
129.84
|
M/s, Liton Trader's,
|
129.66
|
08/07/2020
|
15/07/2020
|
14/07/2021
|
100
|
129.66
|
100
|
29/09/2022
|
|
165
|
Dinajpur
|
58
|
hakimpur
|
417
|
824
|
UIIP-BC/PCO/W-50
|
(a) Rehabilitation of BC road at Hili-Ghoraghat road near Chatni Charmatha Bazar to Rangamati more. Ch. 0+00 ~ 2+100 km, Woard no. 09, Under Hakimpur (Hili) Pouradshava.(b) Construction of BC road at LSD Godowan more to Hili Rail station. Ch. 0.000 ~ 350.00m, Woard no.03
|
|
2.45
|
0.00
|
0.00
|
129.84
|
M/s, Liton Trader's,
|
129.66
|
08/07/2020
|
15/07/2020
|
14/07/2021
|
100
|
129.66
|
100
|
29/09/2022
|
|
166
|
Dinajpur
|
58
|
hakimpur
|
417
|
824
|
UIIP-BC/PCO/W-50
|
(a) Rehabilitation of BC road at Hili-Ghoraghat road near Chatni Charmatha Bazar to Rangamati more. Ch. 0+00 ~ 2+100 km, Woard no. 09, Under Hakimpur (Hili) Pouradshava.(b) Construction of BC road at LSD Godowan more to Hili Rail station. Ch. 0.000 ~ 350.00m, Woard no.03
|
|
2.45
|
0.00
|
0.00
|
129.84
|
M/s, Liton Trader's,
|
129.66
|
08/07/2020
|
15/07/2020
|
14/07/2021
|
100
|
129.66
|
100
|
29/09/2022
|
|
167
|
Dinajpur
|
58
|
hakimpur
|
417
|
824
|
UIIP-BC/PCO/W-49
|
(a) Construction of RCC road at Rangamatia Rahim Master house to Karim hazi house Ch. 0+00~0+100.00km. And East side Karim hazi house to Mashudul house. Ch. 0+100~0+252km. Total Lengtg = 0.252km(b) Construction of RCC road at Uddaigiri Hili-Ghoraghat road to Juel house & Gohara Mohan house to Bodla house via Badol house & Nobanu house . Ch.0+00~0+630km.Word no. 08(c) Construction of RCC road at Moddho Bashudebpur (Mathpara) Foju house toeast side Kader house Ch. 0+00~0+110km. under word no. 04(d) Construction of RCC road at Dhakkin Bashudebpur (Malepara) Joshim So mill to Hili-Shonapur road Ch. 0+00~0+332km. under word no. 05
|
|
1.32
|
0.00
|
0.00
|
108.41
|
M/s, Liton Trader's,
|
108.27
|
08/07/2020
|
15/07/2020
|
08/07/2021
|
100
|
108.23
|
100
|
29/09/2022
|
|
168
|
Dinajpur
|
58
|
hakimpur
|
417
|
824
|
UIIP-BC/PCO/W-48
|
(a) Rehabilitation of BC road at Hili Hospital mor to Dodu Chatall. Ch.0+00-0+913, L=0.913 km under word no. 01
(b)Rehabilitation of BC road at Hili-Ghoraghat road South side Rautara Anshar VDP Club. Ch. 0.000 ~0.870 km, Woard no. 08,
(c) Construction of RCC road at Moddho Bashudebpur Kashem house west side Adv. Golam house. Ch.00.00~0.163.00km. under word no. 04
(d) Construction of RCC road at Moharapara Motin house to Mizanur house Ch. 00.00~0.090.00 km.under word no. 01
(e) Construction of RCC road at Choto Dangapara Toslim house to west side Start of Boro Dangapara. Ch. 0+00~0+0.355km. Under Woard No. 07
(f) Construction of RCC road at Ismailpur more to north side Anshar house. Ch. 0+00~0+260km. Under Woard No. 07
(g) Construction of RCC road at Rautara Malek house to east side Shopon house (Near Culvert). Ch. 0+00~0+130km. L=0.130km Woard No.08
(h) Construction of RCC road at Palpara Shopon house East side Shahidul house Ch. 0+00~0+140km. Under word no. 06
|
|
2.92
|
0.00
|
0.00
|
170.48
|
M/s, Liton Trader's,
|
170.30
|
30/09/2020
|
10/07/2020
|
29/09/2021
|
100
|
170.12
|
100
|
29/09/2022
|
|
169
|
Faridpur
|
31
|
alfadanga
|
254
|
824
|
UIIP-BC/PCO/W-635
|
A) Improvement of road starting from Alfadanga Nurani Mosque culvert to Bazidanga road Bottola (via Mithapur Maddrasha) ch 0.00m-1242.00m at ward no 08 & 09 under Alfadanga pourashava, Faridpur.
B) Improvement of road starting from Bakail road (Bapari para Mosque) to Gopalpur road ch 0.00-270.00m at ward no. 03 under Alfadanga pourashava, Faridpur.
|
|
|
|
|
194.69
|
|
0.00
|
|
|
|
0
|
0.00
|
0
|
17/10/2024
|
|
170
|
Faridpur
|
31
|
alfadanga
|
254
|
824
|
UIIP-BC/PCO/W-611
|
A) Improvement of road starting from Alfadanga Bazar Chourasta to Old Paribahan Stand (BRAC Office) Ch 0.00m-520.00m by RCC at Ward No. 07, Under Alfadnaga Pourashava, Faridpur.
B) Improvement of road starting from Alfadanga Mohisarghop road to Dholae char road shammer moor ch 0.00m-900.00m by BC in Ward No. 09 under Alfadnaga Pourashava, Faridpur. Salvage Amount: 46508.00 BDT
|
|
|
|
|
1115.30
|
|
0.00
|
|
|
|
0
|
0.00
|
0
|
17/10/2024
|
|
171
|
Faridpur
|
31
|
alfadanga
|
254
|
824
|
UIIP/PCO/G-51
|
Implementation & Supply 781 nos Waste Basket (120 ltr) & 9 nos Non-motorized vehicle (van) under Alfadanga Pourashava District: Faridpur.
|
|
|
|
1.00
|
39.96
|
RFL Plastrics Limited
|
25.19
|
|
|
|
60
|
15.00
|
0
|
17/10/2024
|
|
172
|
Faridpur
|
31
|
alfadanga
|
254
|
824
|
UIIP-BC/PCO/W-566
|
A) Improvement of RCC Road Starting from Alfadanga Bazar Chourasta to Collage road Nurani Jame Mosque (Ch.0.00-530.00m) at Ward No.07&08 under Alfadanga Pourashava, Dist: Faridpur.
B) Improvement of BC Road Starting from Alfadanga Nodir Beri BC Road (Near Loca Strand Morti moor) To Mithapur Chorpara Nodir Beri Bottola BC road (Near Mohhamad Ali House) Ch.0.00-1260.00m & Link Ch 0.00-195.00m
|
|
2.10
|
|
|
234.95
|
M/S. Kochi Enterprise
|
231.68
|
16/01/2024
|
22/01/2024
|
15/01/2025
|
99
|
132.13
|
57
|
17/10/2024
|
|
173
|
Faridpur
|
31
|
alfadanga
|
254
|
824
|
UIIP-BC/PCO/W-460
|
A) Side Widening & Improvement of BC Road Starting from Alfadanga-Kashiani BC Road (Kusumdi Govt. Primary School) to Alfadanga College road (Near Chualliser Mor) (Ch.0.00-640.00m) at ward No.06 & 07 under Alfadanga Pourashava Dist: Faridpur. (L=640.00 m Width=3.50 m).
B) Improvement of RCC drain of Alfadanga Bazar Kamal studio to Malo-Para Pongkoj Bisshas House (Ch.0.00-95.00m) at ward No.07 under Alfadanga Pourashava Faridpur.
C) Construction of Two Vent RCC Box Culvert (Size 2x4.00x4.00m) at Ch.650.00m of Kusumdi Kali Mondir to Echapasha BC road at ward no.05 under Alfadanga Pourashava Dist:Faridpur.
D) Construction of Two Vent RCC Box Culvert (Size 2x4.00x4.50m) on Echapasa Khal at Echapasa Koborsthan under Alfadanga Pourashava Dist. Faridpur.
E) Construction of Two Vent RCC Box Culvert (Size 2x4.00x4.00m) on Nowapara Khal near Moddho Nowapara khal par Jame Mosque (Jabed Member House) at ward No.04 under Alfadanga Pourashava dist:Faridpur.
F) Construction of single Vent RCC Box culvert (size 1x1.50m x 1.50m) at Ch.350.00m of Buraich Asad house to Bakail Eid-gha BC road at ward no.01 under Alfadanga Pourashava dist:Faridpur.
|
|
0.64
|
|
|
153.63
|
M/S. Kochi Enterprise- ACL (JV)
|
149.22
|
27/10/2022
|
02/11/2022
|
26/10/2023
|
100
|
147.98
|
100
|
17/10/2024
|
|
174
|
Faridpur
|
31
|
alfadanga
|
254
|
824
|
UIIP-BC/PCO/W-472
|
A) Construction of Shed for Public Transport Passenger (28.00 sqm) At Alfadanga local Bus Stand under Alfadanga Pourashava Faridpur.B) Construction of One Storied Public Toilet (Type A=56 sqm) at Alfadanga Bazer Dok Market under Alfadanga Pourashava Faridpur.C) Construction of One Storied Vegetables & Agricultural Products Market of 5 Storied Foundation (Floor Area=314 sqm) at Alfadanga Old Union Parishod under Alfadanga Pourashava Faridpur.
|
|
|
0.00
|
3.00
|
152.74
|
M/S. Kochi Enterprise- ACL (JV)
|
151.84
|
17/05/2022
|
23/05/2022
|
27/06/2024
|
99
|
114.23
|
76
|
17/10/2024
|
|
175
|
Faridpur
|
31
|
alfadanga
|
254
|
824
|
UIIP-BC/PCO/W-290
|
(A) Improvement of BC road near T&T mhor to Sirirampur Kasem mia house via upazila auditoriam ch.0.00 - 435.00m with 02 link road Leangth 442m. Woard no. 02 . Under Alfadanga Pourashava,Dist - Faridpur Total Leangth 877 m.(B) Improvement of BC road starting from Mithapur Nodir Beri BC road to Mithapur Mukammel Hosen Motuk Khalashi House Via college road ch. 0.00-400.00m under Alfadanga Pourashava, Dist.- Faridpur(C) Improvement of BC road Starting from Mithapur Madrasha to Mithapur-Jatikgram BC road via Monnur House Ch. 0.00-715.00m and three 3 no. U Drain/Cross Drain at chainage 270.00m-440.00m & ch. 700m at Woard no. 09 Under Alfadanga Pourashava, Dist.- Faridpur(D) Improvement of BC Road Starting from Alfadanga Kasiani BC Road near Vhor Kusumdi Rejul Shop to Echapasha Moddo-Para BC road Near Hobi Munshi Shop Ch. 0.00-265.00m with one 01 Link road Vhor Kusumdi daud House to Zakir House Khal par Road ch.0.00-290.00m woard no.-05 &06 under Alfadanga pourashava, Dist.- Faridpur.(E) Improvement of BC road starting from Alfadanga Kasiani BC road Near Echapasa Bridge to Vhor Kusumdi Akter Hossain House Khal par road ch. 0.00-370.00m at woard no. 06 under Alfadanga Pourashava, Dist.- Faridpur
|
|
1.99
|
0.00
|
0.00
|
279.11
|
M/s. Kochi Enterprise-ACL (JV)
|
238.14
|
20/09/2021
|
|
25/09/2022
|
100
|
238.14
|
100
|
29/09/2022
|
|
176
|
Faridpur
|
31
|
alfadanga
|
254
|
824
|
UIIP-BC/PCO/W-258
|
(a).Improvement of road side R.C.C drain of Alfadanga College road starting from Bazar Chourasta to Kusumdi Khal Ch.0.00-515.00m at ward no.07&08. (b)Improvement of road side R.C.C drain of Kali Babu Road starting from College road Cualisher Mhor to Totamia house Ch.0.00-412.00m with 01one Link road Ch.0.00-130.00m at ward no.07&08 Under Alfadanga Pourashava Faridpur.
|
|
|
0.00
|
0.00
|
243.33
|
M/S. Kochi Enterprise- ACL (JV)
|
211.28
|
25/01/2021
|
02/02/2021
|
02/01/2022
|
100
|
210.68
|
100
|
29/09/2022
|
|
177
|
Faridpur
|
31
|
alfadanga
|
254
|
824
|
UIIP-BC/PCO/W-257
|
(a)Improvement of B.C road starting from Alfadanga-Kashiani B.C Road Near Aynuddin Munshi Mhor to Kusumdi Kali-Mondir B.C road remaining part Ch.0.00-600.00 M at ward no.06 of Alfadanga Pourashava Dist: Faridpur.(b)Improvement of B.C Road Starting from Bacail-Nagarkanda B.C Road Near Miraj House to Kuciagram B.C Road Via Kuchiagram Govt. Primary School Ch.0.00-1180.00m with link road Ch.0.00-40.00m at ward no.03 under Alfadanga Pourashava Dist: Faridpur.(c)Improvement of B.C Road Starting from Alfadanga-Kuchagram B.C road Near Nowapara Delower house to Bacail-Nagarkanda B.C road Via west Nowapara Jame Mosjid Ch.0.00-500.00m With link road Ch.0.00-120.00m at ward no.04 under Alfadanga Pourashava Dist: Faridpur.
|
|
2.44
|
0.00
|
0.00
|
216.99
|
M/S Samia Enterprise, Pro:Shah Muhammad Emar Hoque.
|
214.97
|
25/01/2021
|
02/02/2021
|
01/02/2022
|
100
|
214.97
|
100
|
29/09/2022
|
|
178
|
Faridpur
|
31
|
alfadanga
|
254
|
824
|
UIIP-BC/PCO/W-35
|
A) Improvement of B.C Road Starting from Mithapur Battola B.C Road Nodir beri road to Mithapur Talukder para B.C road Near Raza sikder house Ch.0.00-1885.00m at ward no.09 of alfadanga pourashava faridpur.B) Improvement of B.C Road Starting from Buraich Nodir beri B.C Road Near Tara mia Shop to Hidadanga B.C Road Near Hidadanga Sluice gate Ch.0.00-850.00m With 2 two link road at ward no.01 of alfadanga pourashava faridpur.C) Improvement of R.C.C road starting from Alfadanga Upazila road near central Jame Mosque to Alfadanga Kuchiagram B.C road near Aunirban school Ch.0.00-368.00m at ward no. 07 of Alfadanga Pourashava Dist Faridpur
|
|
3.08
|
0.00
|
0.00
|
301.94
|
M/S. Kochi Enterprise- ACL (JV)
|
300.44
|
23/07/2020
|
|
29/07/2021
|
100
|
300.41
|
100
|
29/09/2022
|
|
179
|
Faridpur
|
31
|
bhanga
|
255
|
824
|
UIIP/PCO/G-52
|
Implementation & Supply 521 nos Waste Basket (120 ltr) & 25 nos Non-motorized vehicle (van) under Bhanga Pourashava District: Faridpur.
|
|
|
|
1.00
|
40.00
|
RFL Plastics Limited
|
29.97
|
|
|
|
0
|
0.00
|
0
|
17/10/2024
|
|
180
|
Faridpur
|
31
|
bhanga
|
255
|
824
|
UIIP-BC/PCO/W-578
|
Construction of One storied vegetables & agricultural products market of 5 storied foundation (Floor area=270 sqm) at Bhanga Pourashava,Faridpur.
|
|
|
|
1.00
|
157.01
|
M/S. Tarek Traders-Golam Mansur Nannu JV, Bhanga Coatpara, Faridpur
|
124.03
|
15/11/2023
|
20/11/2023
|
14/11/2024
|
40
|
0.00
|
0
|
17/10/2024
|
|
181
|
Faridpur
|
31
|
bhanga
|
255
|
824
|
UIIP-BC/PCO/W-575
|
Improvement of Road from the Slope Bridge Approach to Saw Mill (Panna Mia at Courtper Bazar, L=240.00m) by RCC Under Bhanga Pourashava (Salvage=35,700.00)
2. Improvement of Road from BC Road to Dariar Math Madrasha to H/O Zonu Molla (L=250.00m) by RCC Under Bhanga Pourashava (Salvage=41,772.00)
3. Improvement of RCC Drain with Road backside of Kazi Samsunnesa Girls School (L=136.00m) Under Bhanga Pourashava
4. Improvement of Road from Chiladharchar BC to H/O Shah Saheb by RCC (L=141.00m) Under Bhanga Pourashava
|
|
0.63
|
|
|
119.58
|
Mesarso Mehedi enterprise Pro. Zakir Hossen
|
94.42
|
15/11/2023
|
20/11/2023
|
16/11/2024
|
89
|
69.77
|
74
|
17/10/2024
|
|
182
|
Faridpur
|
31
|
bhanga
|
255
|
824
|
UIIP-BC/PCO/W-451
|
Detail Estimate for the Construction of RCC drain from Eidgah to AC(Land) office Ch.00-470m+Cross Drain 45.00m Total Length=515.00m Under Bhanga Pourashava.
|
|
|
|
|
106.17
|
M/S. Tarek Traders-Bellal Hossain JV, Bhanga Coatpara, Faridpur
|
97.49
|
20/06/2022
|
26/06/2022
|
30/12/2023
|
100
|
97.45
|
100
|
17/10/2024
|
|
183
|
Faridpur
|
31
|
bhanga
|
255
|
824
|
UIIP-BC/PCO/W-192
|
(1) Darier math BC road From the H/O Kawser Matubbar to H/O Inuddin Daroga Ch:00-830.00m with Link (To the H/O x Councillor ) Abutaleb Ch: 00-50.00m ) Total Length =880.00m
(2) Nowpara BC road to H/O Afsar Fakir Ch:00-90.00m
(3) Nowpara (Link road ) BC road to H/O Mr.Tara mirza Ch:00-25.00m
(4) Nowpara BC road to H/O Mr.Ebrahim Ch:00-38.00m(Reject)
(5) Gozana BC road to gozaria mosque Ch:00-65.00m( Reject)
(6) Mowpara BC road to graveyeard (Near H/O Ad.Johurul) Ch:00-45.00m,)
(7) Nowpara (Mirza bari) BC road to BC road Ch:00-188.00m
(8) Nowpara (Link road) BFS road to H/O Mr.Bablu Ch;00-18.00m,)
(9) Kapuriasadardi BC road to H/O Mr.Alamgir Sikder Ch:00-155.00m,
10) Kapuriasdardi BC road to H/O Army Forhad Ch:00-135.00m Total Length= 1639.00m.
|
|
1.64
|
0.00
|
0.00
|
167.08
|
Mehedi Enterprise
|
144.34
|
16/09/2020
|
|
22/09/2021
|
100
|
144.34
|
100
|
17/10/2024
|
|
184
|
Faridpur
|
31
|
bhanga
|
255
|
824
|
UIIP-BC/PCO/W-306
|
1.Kuthibari Charkanda BC Road via H/O Dr. Rezaul Korim to west Hasamdi Ch. 0.00-500.00m
2.Detail Estimate for the RCC Road Starting from BC road to H/O Md. Baccu x-Councillor atNowpara Ch. 0.0-80
003. Detail Estimate for the RCC Road Starting from BC road to H/OFerodous at Gozari Ch. 0.00-30.00m
4. Detauk Estimate for the RCC road Starting form BC road toH/O Goffar Masud at kuthibari Ch 0.00-197.00m
5. Detail Estimate for the RCC Road Startingfrom BC Road to H/O Biplob at Kuthibari Ch.0.00-90.00m
6. Detail Estimate for the RCC RoadStarting form BC road to H/O Zahangir Vender at Kuthibari Ch.0.00-55.00m
7. Detail Estimate forthe RCC Road Starting BC Road to Razib Monshi Near Toli Hospital at Bhanga Bazar Ch.0.00-106.00m
8. Detail Estimate for the RCC Road Starting from BC Road to H/O Sahin Sultan atBhanga Bazar Ch.0.00-120.00m
9. Detail Estimate for the RCC Road Starting from BC Road toH/O Ishaq Molla at Varoidanga Ch0.00-241.00m
10. Detail Estimate for the RCC Road Startingfrom BC Road to H/O Nazurl at Atadi Ch.0.00-37.00m(Reject)
11. Detail Estimate for the RCC RoadStarting from BC Road to H/O Alomgir vender at Atadi Modhopara Ch0.00-120.00m
12. DetailEstimate for the RCC Road Starting from BC Road to H/O Sattar at Kuthibari Ch0.00-220.00m
|
|
1.22
|
0.00
|
0.00
|
246.44
|
Mesarso Mehedi enterprise Pro. Zakir Hossen
|
199.36
|
25/04/2021
|
|
25/04/2022
|
93
|
168.13
|
84
|
17/10/2024
|
|
185
|
Faridpur
|
31
|
bhanga
|
255
|
824
|
UIIP-BC/PCO/W-307
|
Detail Estimate for the RCC Drain Starting from West Side of Bhanga Upazila Complex to Jelepara Culvert Ch. 0.00-450.00m (B) 2 nos Cross Drain (30.00+30.00) =60.00m Total Length = 510.00m
|
|
|
0.00
|
0.00
|
90.03
|
Mesarso Mehedi enterprise Pro. Zakir Hossen
|
73.89
|
25/04/2021
|
|
25/04/2022
|
100
|
73.89
|
100
|
17/10/2024
|
|
186
|
Faridpur
|
31
|
bhanga
|
255
|
824
|
UIIP-BC/PCO/W-193
|
(1) Omit Chowdhory to H/O Alok Chowdhory Ch:00-80.00m
(2) Chilladharchar RCC Road Govt.Primary School to H/O Babu Bari Ghat Ch:00-170.00m
(3) RCC road Starting from Govt.Godown to H/O Bimol Ch:00-40.00m
(4) RCC road starting form BC to H/O Abul Kalam(xCouncillor) Ch;00-145.00m
(5) RCC road starting from In front of BRACK BANK at Bhanga Bazar Ch:00-70.00m withRCC Drain Length= 90.00m
|
|
0.51
|
0.00
|
0.00
|
64.27
|
Mehedi Enterprise
|
54.39
|
16/09/2020
|
|
22/09/2021
|
100
|
49.27
|
91
|
29/09/2022
|
|
187
|
Faridpur
|
31
|
bhanga
|
255
|
824
|
UIIP-BC/PCO/W-191
|
(1) Koidobi BC road to H/O Kulsum Begum Ch:00-75.00m.
(2) Hogladangi BC road to H/O Mr. Liakot Mollal Ch:00-80.00m. Detail Estimate for the RCC road starting from
3. hogladangi BC road to H/O Mr.Youns Chakderl Ch:00-210.00m
(4) hogladangi BC road to H/O Mr. Uzzal & Zaker Molla Ch;00-80.00m
(5) Bastokhola BC road to H/O Serajmirdha Ch:00-136.00m
(6) Bastokhola BC road to H/O SK Sadek Ali Ch:00-28.00m
(7) Chiladharchar BC road to H/O Hazi Hader Ch:00-65.00m
(8) Bastokhola BC road to H/O Balam Mirdha Ch:00-65.00m
(9) Bastokhola BC road to H/O SK Sorat Ch.00-31.00m
(10) Bastokhola BC road to Bastokhola BC Ch:00-135.00m
(11) Childharchar BC road to H/O Samim Fakir ChL00-25.00m
(12) Chiladharchar BC road to H/O Jalal Kha Mosque Ch.00-45.00m
(13) Childharchar BC road to H/O Asgor Ch:00-25.00m
(14) Detail Estimate for the RCC Drain Starting from BC road to River at Kapuria Sadardi near House Rezaul Bishas ( Drain Length-75.00m)
|
|
1.00
|
0.00
|
0.00
|
111.20
|
Mehedi Enterprise
|
94.51
|
16/09/2020
|
|
22/09/2021
|
100
|
90.79
|
96
|
29/09/2022
|
|
188
|
Faridpur
|
31
|
bhanga
|
255
|
824
|
UIIP-BC/PCO/W-56
|
(1) Chondidashdi BC to H/O Khitish. Ch,00-35.0m,
(2) Chondidashdi BC to H/O Sonjoy, ch,00-36.0m,
(3) Chondidashdi BC to H/O Abdul Baki Monshi,ch,00-35.0m,
(4) Chondidashdi BC to H/O Sonjoy Samol Bhowmik,ch, 00-25.0m.,
(5) Chondidashdi BC to H/O Abul Basher, ch,00-40.0m.,
(6) Chondidashdi BC to H/O Moti Molla, ch 00-30.0m
(7) Chondidashdi BC to H/O Sadhin Sarkar, Ch ,00-30.0m,
(8) Chondidashdi BC to H/O Kalipodo sarker,ch, 00-50.0m.,
(9) Chondidashdi BC to H/O Dipok Sarkar, Ch,00-36.0m
(10) Chondidashdi BC to H/O Bimol Sarkar (mondir), Ch, 00-47.0m.,
(11) Chondidashdi BC to H/O Uzzal master, ch, 00-60.0m.,
(12) Chondidashdi BC to H/O Abu Alam , Ch. 00-65.0m,
(13) Chondidashdi BC to H/O Nannu Monshi, ch, 00-60.0m,
(14) Chondidashdi BC to H/O Sadek Monshi Ch, 00-30.0m,
(15) Chondidashdi BC to H/O Bachu, ch. 00.51.0m,
(16) Chondidashdi BC to H/O Kalam Bepary ch, 00-50.0m,
(17) Chondidashdi BC to H/O Fazlul Haque, ch, 00-50.0m.
(18) Chondidashdi BC to H/O Mohor Ali, Ch, 00-50.0m,
(19) Chondidashdi BC to H/O Rostom Beparyi, Ch, 00-45.0m
(20) Chondidashdi BC to H/O Akter, ch, 00-60.0m,
(21) Dariarmath I BC to H/O Rashid, Ch, 00-30.0m,
(22) Chondidashdi BC to H/O Monobindro ch, 00-41.0m
(1) Koidobi BC road to H/O Kulsum Begum Ch:00-75.00m.
|
|
0.94
|
0.00
|
0.00
|
103.15
|
M/S Mehedi Enterprise
|
85.51
|
16/10/2020
|
|
22/10/2021
|
100
|
80.27
|
94
|
29/09/2022
|
|
189
|
Faridpur
|
31
|
bhanga
|
255
|
824
|
UIIP-BC/PCO/W-55
|
(1) Atadi BC to H/O Salam Moulana Ch, 00-100.0m., (2) East Hasamdia BC to H/O Riroz firoz sheikh ch. 00-90.0m, (ch.00-88m)(3) East Hasamdia BC to H/O Khaque Master ch, 00-90.0m(ch.00-54m)(4) East Hasamdia BC to H/O Montu, ch, 00-115.0m, (ch.00-117m)(5) East Hasamdia BC to H/O Mannan Master, ch, 00-135.0m, (ch.00-33m)(7) Atadi BC to H/O Zahangir Lashkar, ch. 00-60.0m, (ch.00-61m)(9) Atadi BC to H/O Forhad Mia, ch 00-45.0m,(ch.00-190m) (12) Atadi BC to H/O Abdul Aziz ch, 00-38.0m, (ch.00-49.50m)13)Atadi BC to H/O Add Khaled ch. 00-120m.(ch.00-121m)
|
|
0.73
|
0.00
|
0.00
|
106.96
|
Mehedi Enterprise
|
86.63
|
16/10/2020
|
|
22/10/2021
|
100
|
33.12
|
38
|
29/09/2022
|
|
190
|
Faridpur
|
31
|
bhanga
|
255
|
824
|
UIIP-BC/PCO/W-54
|
(1) Hoglakandi BC road to H/O Samad Bishwas. Ch; 00-105.0m (2) H oglakandi BC road to H/O K abir Khandakar. ch; 00-45.0m (3) H oglakandi BC road to H /O M ohi Sarif. ch; 00-110.0m (4) Hoglakandi BC road to H/O M into. ch; 00-93.0m(5) H oglakandi BC road to H/O Harun matubbar. ch; 00-50.0m (6) Hoglakandi BC road to H/O Botu- Khandakar.ch;00-55.0m (7) Baishakhali BC to H/O billal. ch: 00-85.0m (8) Baishakhali BC to H/O O m ar H annan ch;0D-l 00.0m (9) Kuthibari BC to H/O Helon ch;00-135.0m. (10) RCC road starting from BC to BC at K27M College Cam pus ch; 00-52.0m (11) RCC road starting from Hogladangi BC to Tohsilder H ouse ch;00-85.0m. (12) from Varoidanga RCC road to H/O Serajul Islam, ch; 00-31.0in Total Length=946.00m. Tender ID- 504950
|
|
0.81
|
0.00
|
0.00
|
114.96
|
M/S MAK-MME (JVC)
|
114.72
|
04/02/2021
|
07/02/2021
|
08/02/2022
|
100
|
109.22
|
95
|
29/09/2022
|
|
191
|
Faridpur
|
31
|
faridpur-s
|
258
|
824
|
UIIP?PCO/G-54
|
Implementation & Supply 798 nos Waste Basket (120 ltr) & 8 nos Non-motorized vehicle (van) under Faridpur Pourashava District: Faridpur.
|
|
|
|
1.00
|
40.00
|
RFL Plastics Limited
|
25.53
|
|
|
|
0
|
0.00
|
0
|
03/11/2024
|
|
192
|
Faridpur
|
31
|
faridpur-s
|
258
|
824
|
UIIP-BC/PCO/W-365/1
|
A) Construction of RCC Drain from South Jhiltuli main drain (Al-Modina store) to Purbakhabaspur link road (Dhakia potti) via Emambag Mosque (Ch:0.00-295.0m) under Faridpur Pourashava, Faridpur.
B) Construction of RCC Drain from Shantibag road side main drain (Bismillah general store) to kolomer more via shahebs home (Ch:0.00-300.0m) under Faridpur Pourashava, Faridpur.
|
|
|
|
|
118.13
|
Md. Saidur Rahman
|
103.03
|
28/03/2024
|
05/04/2024
|
27/03/2024
|
35
|
25.60
|
25
|
03/11/2024
|
|
193
|
Faridpur
|
31
|
faridpur-s
|
258
|
824
|
UIIP-BC/PCO/W-597
|
A) Improvement of Shovarampur BC Road from Mahim School to Slwice Gate Bazzar Under Faridpur Pourashava, Ch.0.00-1400.00m. (Salvage Amount-70,604.80)
B) Improvement of BC Road Govt. Rajendra Collage Honours Campus from Baitul Aman Road to Chemistry & Bangla Department Bhaban Under Faridpur Pourashava, Ch.0.00-409.00m. (Salvage Amount-55,462.46)
C) Improvement of Raghunandanpur BC Road From RHD (Housing State Main Get) to Professional Training Institute Under Faridpur Pourashava, Faridpur Ch.0.00-514.00m. (Salvage Amount-50,534.40)
D) Improvement of Mosjidbari BC Road From Daibetic Hospital more to Rajendra Collage Sohor Campus Under Faridpur Pourashava, Faridpur, Ch.0.00-520.00m. (Salvage Amount-63,884.80)
|
|
2.84
|
|
|
261.81
|
Green Construction
|
231.00
|
22/08/2023
|
27/08/2023
|
21/08/2024
|
100
|
229.55
|
100
|
03/11/2024
|
|
194
|
Faridpur
|
31
|
faridpur-s
|
258
|
824
|
UIIP-BC/PCO/W-539
|
A) Construction of One no. Shed for Public Transport Passenger (28.00sqm) at Bongobondhu Squre, Ward No.06, Under Faridpur Pourashava, Dist: Faridpur.
B) Construction of One Storied Public Toilet (Type A=56.00sqm) at Bongobondhu Squre, Ward No.06, Under Faridpur Pourashava, Dist: Faridpur.
|
|
|
|
2.00
|
46.95
|
M/S Samia Enterprise
|
45.99
|
06/03/2023
|
13/02/2023
|
05/02/2024
|
93
|
29.38
|
64
|
03/11/2024
|
|
195
|
Faridpur
|
31
|
faridpur-s
|
258
|
824
|
UIIP-BC/PCO/W-366
|
(A) Construction of RCC Drain Starting From Shingpar Rakhal Dr. Road to Kumar River Ch.0.00-395.0m Under Faridpur Pourashava.
(B) Construction of RCC Road Starting From Shingpar Rakhal Dr. Road to Kumar River Ch.0.00-355.0m Under Faridpur Pourashava.
(C) Construction of RCC Road Starting From 01 No Road to Abul Driver House Ch:0.00-180.00 Under Faridpur Pourashava.
(D) Construction of BC Road Starting From 01 No Road Babri Mosque to Nurumia by pass Road Ch:950.00-1252.0m Under Faridpur Pourashava.
(E)Construction of RCC Cross Drain Starting from Wapda Godown Road (Near Rathkhola) Length=8.00m Under Faridpur Pourashava.
(F)Construction of RCC Road Starting fromAlipur Town Embankment Road (Bedea Para) to Rail Line Ch:0.00-234.00m Under Faridpur Pourashava.
(G) Construction of RCC Drain Starting From Wearlesspara Chairman Hakim Mia House to Kumar River.Ch:0.00-402.0m. Under Faridpur Pourashava.
(H) Construction of RCC Drain Starting From Management College (Housing State) to Mr. jamal pond ad Housing state main road to A Block.Ch:0.00-160.00m Under Faridpur Pourashava.
(I)Construction of RCC Cross Drain Starting from Madha Alipur Road (Infront of Khonika Building) Length=8.00m Under Faridpur Pourashava.
|
|
1.07
|
0.00
|
0.00
|
265.95
|
Md. Saidur Rahman
|
230.68
|
25/11/2021
|
02/12/2021
|
30/11/2023
|
80
|
150.47
|
65
|
03/11/2024
|
|
196
|
Faridpur
|
31
|
faridpur-s
|
258
|
824
|
UIIP-BC/PCO/W-365
|
(A) Construction of RCC Road Starting From RHD to Kaharpara Road Ch.0.00-90.0m Under Faridpur Pourashava.
(B) Construction of RCC Drain Starting From Debdas House to Charkamlapur Drain (Anather More) Under Faridpur Pourashava. Ch:0.00-140.00m
(C) Re-Construction of BC Road Starting From Tepakhola Bazar to Sluice Gate (Munshi Bari Road) Under Faridpur Pourashava.Ch: 0.00-503.00m
(D) Construction of RCC Road Starting From RHD to Shishu park Pond Ch:0.00-176.0 Under Faridpur Pourashava.
(E) Construction of RCC Road Starting From Mosjidbari Road to Mr. Abdullah House.Ch:0.00-86.0m Under Faridpur Pourashava.
(F)Construction of RCC Cross Drain Starting from Kobi Jossimuddin Road (Near Khakpir House) Length=22m, Under Faridpur Pourashava.
(G) Construction of RCC Drain Starting From RHD to Shishupark pond Under Faridpur Pourashava.Ch:0.00-136.00m. Under Faridpur Pourashava.
(H) Construction of HBB Road Starting Faridpur Chorvodrason Road to Nawab Ali House Under Faridpur Pourashava.Ch:0.00-425.00m
(I) Re-Construction of BC Road Starting From Vatilokkhipur Shoid Minar to RHD Under Faridpur Pourashava.Ch:0.00-440.0m
(J) Construction of RCC Road Starting From Alipur Bapari Bari Road to Shofi Masters House Under Faridpur Pourashava.Ch:0.00-174.00m
(K) Construction of RCC Cross Drain Starting DIB Bottola (infront of Bornomala Building) Length= 9.00m Under Faridpur Pourashava.
(L)Construction of RCC Cross Drain Starting From Thana Road (Infront of Masranga shopping mall) Length=9.00m Under Faridpur Pourashava.
(M)Construction of RCC Cross Drain Starting From Dhopa Bari Road (Infront of Abdul Halim Mia House) Length=9.00m Under Faridpur Pourashava.
(N)Construction of RCC Drain Starting From (i)Shantibag Road(Dr. Faruk House to shahabuddin House (ii) Emagbag Road to Kumar River (i+ii)=190.00m+197.00m=387.00m. Ch:387.00m Under Faridpur Pourashava.
|
|
1.89
|
0.00
|
0.00
|
281.76
|
Ajam Construction LTD.
|
234.77
|
21/11/2021
|
28/11/2021
|
28/02/2024
|
100
|
101.05
|
100
|
03/11/2024
|
|
197
|
Faridpur
|
31
|
faridpur-s
|
258
|
824
|
UIIP-BC/PCO/W-158
|
a) Estimate for Construction of R. C.C Road With R.C.C Drain Starting from Char Kamlapur Jora Bridge Munshi Bari Road to Madrasha Under Faridpur Paurashava. CH 00.00-320.00 M
b)Estimate for Construction of B.C Road Starting From Parchar Baribadh to Shahid Kabiraj House Under Faridpur Paurashava. CH 00.00-408.00m
(c)Estimate for R.C.C Road Starting From Ali Pur Yeasin Road to Barek Sheikh Road CH 00.00-322.00 , Width =3.00 M Under Faridpur Paurashava.
(d)Estimate for Construction of B.C Road Starting From Parchar Baribadh to Parchar Barai Bari to Matilal Kintar Gurden School Under Faridpur Paurashava. CH 00.00-860.00 m
(e)Estimate for Bdamtoli Road Starting From Badamtoli bridge to Pial House to Forid Mollah House CH 00.00-334.00 , Width =3.50 M Under Faridpur Paurashava.
|
|
2.24
|
0.00
|
0.00
|
265.06
|
Faridpur Jannat Construction Ltd.
|
264.90
|
05/10/2020
|
12/10/2020
|
04/10/2021
|
100
|
263.25
|
100
|
03/11/2024
|
|
198
|
Faridpur
|
31
|
faridpur-s
|
258
|
824
|
UIIP-BC/PCO/W-122
|
( a) Estimate For Improvement of Bonik Bari Road starting from Kobi Jossaimuddin Road to Town Embanment road By B.C Under Faridpur Paurashava. CH 00-00-1070.00 m
( b)Estimate for R.C.C Road Starting From North Bill Mahamudpur High School Bridge to Kholifa Bari Mosque Under Faridpur Paurashava. CH 00.00- 510.00 , Width =3.00 M
( c) Estimate for Construction of B.C Road Starting From RHD to Sukumar House at Badarpur Under Faridpur Paurashava. CH 00.00-320.00 m
(d)Estimate for Construction of H.B.B Road Starting From RHD (Khanpura Mill/Sunny Filing Station) to Moulavibari Road (Amzad House) Under Faridpur Paurashava. CH 00.00-680.00 M,Width=3.00 M
|
|
2.58
|
0.00
|
0.00
|
187.57
|
Tasa Construction LTD.
|
187.17
|
05/10/2020
|
12/10/2020
|
04/10/2021
|
100
|
123.65
|
66
|
29/09/2022
|
|
199
|
Faridpur
|
31
|
faridpur-s
|
258
|
824
|
UIIP-BC/PCO/W-121
|
(1) (a)Estimate for Improvement Work of Major Tofayel Road Starting From Faridpur DC Office to Tapakhola Cattle Market By B.C Under Faridpur Paurashava. CH 00.00-350.00 m , CH 2120.00-2320.00, Total =550.00 m
(b) Estimate for Improvement Work of Major Tofayel Road Starting From Faridpur DC Office to Tapakhola Cattle Market By B.C Under Faridpur Paurashava. CH 350.00-2120.00 m(1770.00 m). (2) Estimate for R.C.C Road Starting From (a) RHD to Mollah Bari Sarak (Khorshed Vuhyan Road) CH 00.00- 225.00, Width =4.00 M
(b) RHD to Somobay Office (Chowdhuri Bari Road) CH 00.00-350.00 , Width =3.50 M Under Faridpur Paurashava. Total =(CH 225.00 M+350.00)=575.00 m
|
|
2.90
|
0.00
|
0.00
|
238.69
|
Faridpur Jannat Construction Ltd.
|
238.25
|
05/10/2020
|
12/10/2020
|
04/10/2021
|
100
|
198.66
|
84
|
29/09/2022
|
|
200
|
Faridpur
|
31
|
madhukhali
|
262
|
824
|
UIIP/PCO/G-53
|
Implementation & Supply 651 nos Waste Basket (120 ltr) & 17 nos Non-motorized vehicle (van) under Madhukhali Pourashava District: Faridpur.
|
|
|
|
1.00
|
39.98
|
RFL Plastrics Limited
|
29.90
|
|
|
|
0
|
0.00
|
0
|
17/10/2024
|
|
201
|
Faridpur
|
31
|
madhukhali
|
262
|
824
|
UIIP-BC/PCO/W-586
|
Improvement of BC road at Purbo Garakhola from Taru Shek House to Gopaladi road Mozibor Molla house (Length=2412.00m) at ward no 07 & 06 under Modhukhali Pourashava. FY 2022-2023
|
|
2.41
|
|
|
132.30
|
M/S Asif Construction
|
114.76
|
17/12/2023
|
17/12/2023
|
16/12/2024
|
65
|
55.94
|
49
|
17/10/2024
|
|
202
|
Faridpur
|
31
|
madhukhali
|
262
|
824
|
UIIP-BC/PCO/W-581
|
1. Construction of RCC road (Ch 0.00m-48.7m) with 1 no Cross Drain at (Ch48.70-50.10m) from Dhaka-Khulna Highway to Madhukhali Bazar public toilet at (ward no.04) under Madhukhali Pourashava. FY-2022-2023
2. Construction of RCC road Ch 0.00m-113.40m with Link "T" Ch 0.00m-11.30m (Total Length=124.70m) at Madhukhali Bazar from Mohila Market to Bazar Durga Mondir at ward no 04 under Modhukhali Paurashava FY 2022-2023.
3. Construction of RCC Drain at Madhukhali Bazar from Samol Jewlers to Bipul Shop Ch 0.00m-132.00m at ward no 04 under madhukhali Paurashava FY 2022-2023.
|
|
0.61
|
|
|
68.23
|
Al-Amin Traders Pro- Anisuzzaman
|
66.51
|
17/12/2023
|
12/02/2024
|
16/12/2024
|
100
|
53.52
|
80
|
17/10/2024
|
|
203
|
Faridpur
|
31
|
madhukhali
|
262
|
824
|
UIIP-BC/PCO/W-403
|
(A) Construction of BC Road at Sreepur Uzzol Shop to Sreepur High School at ward no 06 (Length=780.00m)
(B) Improvement of BC Road at Dhaka-Kulana Highway from Gondardia-College Para from Lutfor house to New Mosjid (Length =364.00m)
(C) Improvement of BC road at Purbo Garakhola from Bangla-Link Tower to Vatakandi Mathurapur Amirunnesh Madrasha at ward no 07 & 06 (Length=350.00m)
(D) Improvement of BC at Nodia Bazarkandi Uttorpara New Mosjid to Zalal Fakir House (Length =437.00m) at ward no 07 under Madhukhali Pourashava.(Total Length)=1931.00m
|
|
1.93
|
|
|
166.64
|
Al-Amin Traders Pro- Anisuzzaman
|
167.73
|
28/08/2022
|
04/09/2022
|
27/08/2023
|
100
|
167.63
|
100
|
17/10/2024
|
|
204
|
Faridpur
|
31
|
madhukhali
|
262
|
824
|
UIIP-BC/PCO/W-402
|
(A) Improvement of BC Road at Bonomalida from Mazar Mosjid to Sah Habib Madrasha (Via Mesordia More Bazar to Mohon Molla house) at ward no 08 (Length=1235+278=1513.00m)
(B) Improvement of BC Road at Gondardia from Mirza Farhad house to Dhaka-Khulna Highway (Via Gondardia Kaomi Madrasha) at ward no 02 (Length=615.00m) (Totla Length=2128.00m) under Madhujhali Pourashava
|
|
2.13
|
|
|
164.77
|
Al-Amin Traders Pro- Anisuzzaman
|
165.84
|
28/08/2022
|
04/09/2022
|
27/08/2023
|
100
|
165.84
|
100
|
17/10/2024
|
|
205
|
Faridpur
|
31
|
madhukhali
|
262
|
824
|
UIIP-BC/PCO/W-401
|
(A) Improvement of BC Road at Sreepur Dhakale Para from Ali Hossain Dhaly house to Zabbar Mondol house (via Zalal Mollah House) length 400.00+166.00m = 566.00m)
(B) Improvement of BC road at Sreepur form Dhakale Para Jame Mosjid to Azad house (Length=361.00m) at ward no 06
(C ) Improvement of BC road at West Garakhola (05 no word) at from Helal house to West Garakhola (04 no ward) Rokon house (via Firoz house) (Length=430.00m)
(D) Construction of RCC road from Dhaka – Khalana Highway to Madhukhali Mach Bazar (Length=111.00m)
(E) Construction of RCC road at Madhukhali Narkel Bazar from Sofi Optices Shop to Public Toilet (Length=98.00m) (Total Length=1566.00m) under Madhukhali Pourashava.
|
|
1.57
|
|
|
130.71
|
Al-Amin Traders Pro- Anisuzzaman
|
132.71
|
28/08/2022
|
04/09/2022
|
27/08/2023
|
100
|
132.71
|
100
|
17/10/2024
|
|
206
|
Faridpur
|
31
|
madhukhali
|
262
|
824
|
UIIP-BC/PCO/W-284
|
(A). improvement of B.C road at Dhaka-Khulna highway from Zela Parishad pont to Porikhitpur Tara Mia house via Lokman Khan house at ward no o8 Ch 0.00m- Ch 1200.00m
(B ).Improvement of B.C Road at Nowapara More from Madhupur Bottola to Purator Kamarkhali Rail Line at ward no 03 Ch 0.00m- Ch 450.00m
(C). Improvement of B.C road at Khatal Baru Mohisapur from oleman Molla house to Moyan Uddin house Ch 0.00m – Ch 312.00 m at ward no 01 .
|
|
1.96
|
0.00
|
0.00
|
139.48
|
Golam Munsur Nannu
|
137.46
|
10/11/2021
|
18/11/2021
|
21/11/2022
|
70
|
62.35
|
45
|
17/10/2024
|
|
207
|
Faridpur
|
31
|
madhukhali
|
262
|
824
|
UIIP-BC/PCO/W-285
|
Construction of RCC drain at West Garakhola from Boushakhi Mela Math to Chandona river at ward no 04 & 05 under Madhukhali Pourashava FY 2019-2020. Total Length 730.00m
|
|
|
0.00
|
0.00
|
233.90
|
Ajam Construction Ltd.
|
198.75
|
05/10/2021
|
12/10/2021
|
04/10/2022
|
30
|
88.29
|
49
|
17/10/2024
|
|
208
|
Faridpur
|
31
|
madhukhali
|
262
|
824
|
UIIP-BC/PCO/W-127
|
A) Improvement of BC road at Sreepur from Noba Mir Shop to Rafik Doctor house at ward no. 06 ch.0.00m- ch. 1005.00mUnder Madhukhali Pourshava, B) Improvement of BC road at Dhaka-Khulna Highway from Banglalink Tower to Bonamalidia Abdur Rashid house ch.0.00m- ch. 500.00m at ward no.08., Under Madhukhali Pourashava
|
|
1.51
|
0.00
|
0.00
|
105.78
|
Golam Munsur Nannu
|
86.63
|
09/10/2020
|
|
26/12/2021
|
100
|
86.63
|
100
|
29/09/2022
|
|
209
|
Faridpur
|
31
|
madhukhali
|
262
|
824
|
UIIP-BC/PCO/W-86
|
A) Improvement of B.C road at Sreepur from Sah Mondol house to Shek bari Jame Mosjid at ward no 06 (ch 0.00m- ch 1100m) under Madhukhali Pourashava.B) Improvement of B.C road at Gondardia from Sah Md Faruk (Sanbadik) house to Sumon house at ward no 03 (ch 0.00m-ch 700.00m) under Madhukhali Pourashava.
|
|
1.11
|
0.00
|
0.00
|
167.78
|
Golam Munsur Nannu
|
137.41
|
09/10/2020
|
|
21/12/2021
|
100
|
103.25
|
75
|
29/09/2022
|
|
210
|
Feni
|
8
|
daganbhuiyan
|
42
|
824
|
UIIP-BC/PCO/W-554
|
A) Improvement of road by BC at Ward No: 01, under Dagonbhuiyan Pourashava, Feni (Ch 0.00m-207.00m)
B) Rehabilitation and widening of Chandpur school to pourashava border by BC at Ward No: 08, under Dagonbhuiyan Pourashava, Feni (Ch 0.00-210.00), Salvage Amount=21,247.00 Tk)
C) Re-habilitation and Widening of Tinu Bhuiyan bari to Boro Bari Mosjid by BC at Ward No: 08 under DagonbhuiyanPourashava, Feni (Ch 0.00m-250.00m) Salvage Amount=27,955.00 Tk.
D) Re-habilitation and widening of Bari Bari to Bash Tola road by BC at Ward No: 08 under Dagonbhuiyan Pourashava. CCh 0.00m-390.00m) Salvage Amount = 48,921.00 Tk.
E) RE-habilitation and Widening of Kalam Cont' to Moulovi Abdul Mannan road by BC at Ward No: 02 under Dagonbhuiyan Pourashava, Feni (Ch 0.00m-326.00) Salvage Amount 47,990.00 Tk
|
|
|
|
|
150.38
|
|
0.00
|
|
|
|
0
|
0.00
|
0
|
17/10/2024
|
|
211
|
Feni
|
8
|
daganbhuiyan
|
42
|
824
|
UIIP/PCO/G-50
|
Implementation o& Supply 341 nos Waste Basket (120 ltr) & 36 nos Non-motorized vehicle (van) under Dagonbhuiyan Pourashava District: Feni.
|
|
|
|
1.00
|
39.97
|
RFL plastic ltd.
|
29.99
|
14/03/2024
|
14/03/2024
|
12/09/2024
|
60
|
15.00
|
50
|
17/10/2024
|
|
212
|
Feni
|
8
|
daganbhuiyan
|
42
|
824
|
UIIP-BC/PCO/W-588
|
Construction and widening of Hospital road from Dagonbhuiyan Pourashava, Feni (CH 00-975m)
|
|
0.98
|
|
|
168.94
|
M/S Chowdhury Enterprise
|
185.78
|
11/07/2023
|
18/07/2023
|
17/07/2024
|
15
|
21.31
|
11
|
17/10/2024
|
|
213
|
Feni
|
8
|
daganbhuiyan
|
42
|
824
|
UIIP-BC/PCO/W-587
|
1 Improvement of Surjer Hashi Clinic Road from Koyeller Tek to Alairpur Main Road at Ward No-01 Under Dagonbhuiyan Pourashva, Feni (Ch.0.00- 875.00M)
"2. Improvement of Road from Das Para to Feni Road (Nipu Bhaban) at Word No:09 Under Dagenbhuiyan Pourashva, Feni (Ch.0.00-186.00m)
"
|
|
1.06
|
|
|
194.74
|
"M/S Chowdari Enterprise "
|
204.43
|
14/03/2024
|
21/03/2024
|
20/03/2025
|
23
|
24.39
|
12
|
17/10/2024
|
|
214
|
Feni
|
8
|
daganbhuiyan
|
42
|
824
|
UIIP-BC/PCO/W-531
|
A) Construction of Palisading works at Canal Side of x-Chairman Mohammed Hossain Road Ch.167.00m-758.00m Ward No-04 Under Dagonbhyiyan Pourashava Feni L=591.00m
(B) Construction of RCC Guide Wall Works at Canal Side of X-Chairman Mohammed Hossain Road Ch.0.00m-118.00m Word no-04 Under Dagonbhyiyan Pourashava Feni
C) Construction of RCC Guide Wall Works at Canal Side of Mejjo Hujur House Road to Tal Toli Link Road Ch.263.00m-732.00m Ward No-04 Under Dagonbhyiyan Pourashava Feni
(D) Construction of Palisading works at Jejjo Hujur House Road to Tal Toli Link Road L=25m 24m30m & Canal Side Ch.230.00m-799.00m (L=67m) Ward no-04 Under Dagonbhyiyan Pourashava Feni.
|
|
1.85
|
|
|
189.63
|
M/S Chowdari Enterprise
|
198.95
|
06/09/2022
|
13/09/2022
|
15/04/2024
|
100
|
187.61
|
94
|
17/10/2024
|
|
215
|
Feni
|
8
|
daganbhuiyan
|
42
|
824
|
UIIP-BC/PCO/W-309
|
A )Construction of RCC Drain From Feni Road to Nipu Bhaban Word No: 9 Ch 0.00 - 228.5m B) Construction of RCC Drain From Feni Road to Nipu Bhaban to Faziler Ghat Link Road Word No: 9 : Ch 228.5m - 457mC) Construction Of RCC Drain from Nur Masjid Road, word no 3 . Ch 0.00m- 305.00mD) Construction Of RCC Drain From Sudra Bari (Alipur Road) to Dadnar khal Word no 3. Ch 0.00m-300m
|
|
|
0.00
|
0.00
|
234.57
|
M/SChowdariEnterprise
|
234.30
|
11/04/2021
|
18/04/2021
|
31/07/2023
|
100
|
217.85
|
100
|
17/10/2024
|
|
216
|
Feni
|
8
|
daganbhuiyan
|
42
|
824
|
UIIP-BC/PCO/W-308
|
A) Rehabilitation and widening of bitumenous Carpeting of Faziler Ghat Link Road, word No :9 Ch 0.00m - 475.00m B) Rehabilitation and Widening of Bitumenous Carpeting Road From Nur Mosjid to Sultan miar Bari, Word No :3 Ch: 33m- 275.00m
|
|
0.72
|
0.00
|
0.00
|
65.34
|
M/S Chowdari Enterprise
|
65.31
|
11/04/2021
|
18/04/2021
|
01/07/2022
|
100
|
64.98
|
100
|
17/10/2024
|
|
217
|
Feni
|
8
|
daganbhuiyan
|
42
|
824
|
UIIP-BC/PCO/W-187
|
Improvement of Bitumenous Carpeting Road from Feni road (Gonipur Bazaar) to Udrazpur Ruhul Amin Shop W-8 Ch:0.00m-1433.00m.
|
|
1.43
|
0.00
|
0.00
|
113.26
|
M/SChowdariEnterprise
|
113.24
|
17/08/2020
|
24/08/2020
|
31/12/2023
|
100
|
112.86
|
100
|
17/10/2024
|
|
218
|
Feni
|
8
|
daganbhuiyan
|
42
|
824
|
UIIP- BC/PCO/W-185
|
Improvement of Bitumenous Carpeting Road from Satara Mojil to (Chairman Mohammded Hoshain) Road W-4, Ch:0.00m-1805m.
|
|
1.81
|
0.00
|
0.00
|
129.92
|
M/S Chowdari Enterprise
|
129.89
|
17/08/2020
|
24/08/2020
|
23/08/2021
|
100
|
129.49
|
100
|
17/10/2024
|
|
219
|
Feni
|
8
|
daganbhuiyan
|
42
|
824
|
UIIP-BC/PCO/W-310
|
A) Construction Of Box Culvert Double vent From Freedom Fighter Abdul Malak Road, Word No 3. CH: 0.00m-10.00m B) Construction of box Culvert Double Vent From Mayor Omar Faruk Khan Road, Word no 3. Ch0.00m- 10.00m
|
|
|
20.00
|
0.00
|
104.99
|
M/S Century Traders
|
104.21
|
08/04/2021
|
15/04/2021
|
14/04/2022
|
100
|
102.03
|
98
|
29/09/2022
|
|
220
|
Feni
|
8
|
daganbhuiyan
|
42
|
824
|
UIIP-BC/PCO/W-186
|
Improvement of Bitumenous Carpeting Fazilargat Road from to Muharibari via Engineer Nurul Huda Road W-6 Ch:0.00m-1060.00m
|
|
1.06
|
0.00
|
0.00
|
74.99
|
M/S H.K Enterprise
|
74.77
|
17/08/2020
|
24/08/2020
|
23/08/2021
|
100
|
74.72
|
100
|
29/09/2022
|
|
221
|
Feni
|
8
|
daganbhuiyan
|
42
|
824
|
UIIP-BC/PCO/W-31
|
Improvement of Bitumenous Carpeting Road from North SedarPur to Khajur Gas Tola W-1 Ch:0.00m-680.00m
|
|
0.68
|
0.00
|
0.00
|
48.90
|
M/S H.K Enterprise
|
48.84
|
30/09/2020
|
07/10/2020
|
06/10/2021
|
100
|
48.82
|
100
|
29/09/2022
|
|
222
|
Feni
|
8
|
daganbhuiyan
|
42
|
824
|
UIIP-BC/PCO/W-30
|
Improvement of Bitumenous Carpeting Road from Fathama Monjil FazilerGat Road to Taltoli Link Road W-4 Ch:0.00m-1611.00m
|
|
1.61
|
0.00
|
0.00
|
112.42
|
M/S
Chowdari
Enterprise
|
112.37
|
30/09/2020
|
07/10/2020
|
06/10/2021
|
100
|
112.37
|
100
|
29/09/2022
|
|
223
|
Feni
|
8
|
daganbhuiyan
|
42
|
824
|
UIIP-BC/PCO/W-29
|
Improvement of Bitumenous Carpeting Road from X-Mayor Akbar Hoshain Road W-1 Ch:0.00m-700.00m
|
|
0.70
|
0.00
|
0.00
|
51.42
|
M/s Sajin Corporation
|
51.35
|
30/09/2020
|
07/10/2020
|
06/10/2021
|
100
|
50.64
|
99
|
29/09/2022
|
|
224
|
Feni
|
8
|
daganbhuiyan
|
42
|
824
|
UIIP-BC/PCO/W-28
|
Improvement of Bitumenous Carpeting Road form Krisna-Rampur New Briz to Motin Miar Bari Road W-7 Ch:0.00m-745.00m.
|
|
0.75
|
0.00
|
0.00
|
51.37
|
M/S Hoque Enterprise
|
51.29
|
29/09/2020
|
06/10/2020
|
05/10/2021
|
100
|
50.43
|
99
|
29/09/2022
|
|
225
|
Feni
|
8
|
daganbhuiyan
|
42
|
824
|
UIIP-BC/PCO/W-27
|
Improvement of bitumenus carpeting Road From Pentagon Hospital to Bash tola Road W-9 Ch 72-805m
|
|
0.73
|
0.00
|
0.00
|
57.06
|
M/s Hasanuzzaman Bhuiyan
|
57.80
|
05/04/2021
|
12/04/2021
|
11/04/2022
|
100
|
57.22
|
99
|
29/09/2022
|
|
226
|
Gopalganj
|
28
|
gopalganj-s
|
241
|
824
|
UIIP-PCO/BCO/W-602
|
(A) Improvement of Karalgati Horimondir Road by RCC Starting from Police Line to Rail Line Bridge, Ward No. 01, under Gopalganj Pourashava, (Ch.00-1066.00m), (Salvage Amount=13,00,968.00).
(B) Improvement of RCC road starting from Nripen house to Babu house (Ch.00-43.00m), Faringabari bylane to Mithun house, (Ch.00-45.00m) & Hazzaj house to Land of Rony, (Ch.00-37.00m), Ward No. 04, under Gopalganj Pourashava.
(C) 1. Improvement of RCC at Miapara Koborsthan bylane starting from Harun Manager to H/O Monir Molla (Ch.00-309.00m), Link H/O Humayun Kabir to H/O Tara Munshi (Ch.00-133.00m), 2.Munshi bari bylane near Fireservice road starting from H/O Johur Sadar to H/O Bacchu Sardar (Ch.00-58.00m), Ward No. 05, under Gopalganj Pourashava.
(D) Improvement of RCC road starting from Miapara Rokonuddin road to H/O Asrafu, (Ch.00-137.00m), Ward No. 05, under Gopalganj Pourashava.
(E) Improvement of RCC road at Shabujbag road bylane starting from H/O Murtoja to Lipa via H/O Rousan (Ch.00-60.00m), Ward No. 10, under Gopalganj Pourashava.
|
|
1.89
|
|
|
252.52
|
M/S Lalin Traders
|
252.50
|
20/04/2024
|
30/04/2024
|
29/04/2024
|
21
|
0.00
|
0
|
03/11/2024
|
|
227
|
Gopalganj
|
28
|
gopalganj-s
|
241
|
824
|
UIIP/PCO/G-55
|
Implementation & Supply 194 nos Waste Basket (120 ltr) & 45 nos Non-motorized vehicle (van) under Gopalganj Pourashava, District: Gopalganj.
|
|
|
|
1.00
|
39.96
|
RFL Plastics Limited
|
35.91
|
|
|
|
0
|
0.00
|
0
|
03/11/2024
|
|
228
|
Gopalganj
|
28
|
gopalganj-s
|
241
|
824
|
UIIP-PCO/BCO/W-600
|
1.Improvement of RCC Road at Taghuria starting from Mahagobindo House to Mini House, L-54.00m, Ward No.11.
2. Improvement of RCC Drain at Nabinbag starting from Nabinbag road Tipu Sultan House to Techcnical School South-East Side, L-147.00m Ward No.12.
3. Improvement of RCC Road at Upazala starting from Chapail Road Liaquat Ali House to Modhumati Lack, L=190.00m, Ward No-13.
4. (a) Improvement of RCC Road at Chair Pathali starting from Liaquat House to Box Culvert, L-33.00m (b) Improvement of RCC Road & Drain Mandartola Starting from Mandartola RHD Bridge to AKM Molla House, L-53.00m, Ward No.14
5. Improvement of RCC Road at Chair Pathali Jame Mosque Road Starting from Dhaka-Khulna Road to Nearable Milu Mia House, L=121.00m Ward No.15 (Salvage=42,269.00)
|
|
0.45
|
|
|
100.62
|
M/S. Kamrul & Brothers
|
83.98
|
19/10/2023
|
22/10/2023
|
18/10/2024
|
100
|
82.17
|
100
|
03/11/2024
|
|
229
|
Gopalganj
|
28
|
gopalganj-s
|
241
|
824
|
UIIP-PCO/BCO/W-599
|
1. Improvemen work at Masterpara starting from Liton house to Jahid House by RCC Length=202.00m Ward No.01. (Salvage=65,372.00)
2. Improvemen work at Mouloipara from Banani Apa house to Mazed Molla house by RCC road and Drain, Length=150.00m, Ward No.02. (Salvage=25,948.00)
3. Improvemen work at Bedgram from Bypass to Hitu Sheikh house and from Nuru Molla house to Sajol molla house by RCC Road, Length=70.00m+70.00m, total length=140.00m, ward no.03.
4. Improvemen of Road from H/O Hobi Sarder to H/O Anirul by RCC at Miapara, Word No:05 (Ch0.00-90.00m) (Salvage=20,429.00)
5. Improvement of Himangon Road from Habibur Rahman’s (Fatema Monjil) to Humayun Kabir’s House by RCC Ward No.07 Under Gopalganj Pourashava (Ch.0.00-170.00m)
6. Improvement of Khan Saheb BC Road from Pikul’s House to H/O Khan Shaheb with 42m RCC Drain and 301m BC Road at Ward No:10 Gopalganj Pourashava
|
|
1.05
|
|
|
131.85
|
M/S. Kamrul & Brothers
|
103.91
|
19/10/2023
|
22/10/2023
|
18/10/2024
|
100
|
101.78
|
100
|
03/11/2024
|
|
230
|
Gopalganj
|
28
|
gopalganj-s
|
241
|
824
|
UIIP-PCO/BCO/W-482
|
(1) Construction of 4.00x4.0m 2-vent RCC Box Culvert on Dhalibari road to Gussogram Homio College connecting road under Gopalgnaj Pourashava
(2) Construction of 4.00x4.0m 2-vent RCC Box Culvert on Boiragi Khal (near Miapara Mosque) Miapara Connecting road under Gopalgnaj Pourashava
|
|
|
4.00
|
0.00
|
72.26
|
M/S Lalin Traders
|
58.07
|
18/04/2022
|
24/04/2022
|
17/04/2023
|
100
|
27.50
|
100
|
03/11/2024
|
|
231
|
Gopalganj
|
28
|
gopalganj-s
|
241
|
824
|
UIIP-PCO/BCO/W-481
|
(1) Estimate for Construction of RCC road & Masonary drain work at Teghoria bylane road starting fromm Teghoria road to Selim Fakir house under Gopalgnaj Pourashava L=100.00m
(2) Estimate for Constrcution work of RCC Drain at Bedgram Barobari starting from Fierservice road to Sariful house RCC dran via Sajahan munsi house under Gopalgnaj Pourashava (Ch00-302.00m)
(3) Estimate for Construction of RCC road & Masonary drain work at Moulovhipara bylane road starting from Moulovhipara road to Beptist Charge under Gopalgnaj Pourashava L=82.00m
(4) Estimate for Construction work of RCC Drain at Chandmary bylane road starting from Farhad house to Akhil house under Gopalgnaj Pourashava (Ch00-45.00m)
|
|
0.18
|
0.00
|
0.00
|
90.48
|
M/S Saiful Traders
|
68.01
|
18/04/2022
|
24/04/2022
|
17/04/2023
|
100
|
26.34
|
100
|
03/11/2024
|
|
232
|
Gopalganj
|
28
|
gopalganj-s
|
241
|
824
|
UIIP-PCO/BCO/W-480
|
(1) Estimate for Construction work of Gobra bylane road by HBB starting from Bypass road to Vercity Khalpar road via Ratan house under Gopalganj's Pourashava L=360.00m (2) Estimate for Construction work of RCC Drain at Kristanpara starting from Nazma upa house to DC road Pipe dran via Batu mia house under Gopalganj's Pourashava (Ch00-174.00m) (3) Estimate for Construction work of RCC Drain at Teghori Bottola starting from Ad. Kalachand house to RCC connecting drain via Gobinda master house under Gopalganj's Pourashava (Ch00-174.00m)
|
|
|
0.00
|
0.00
|
89.55
|
M/S Lalin Traders
|
72.12
|
18/04/2022
|
24/04/2022
|
17/04/2023
|
100
|
34.40
|
100
|
03/11/2024
|
|
233
|
Gopalganj
|
28
|
gopalganj-s
|
241
|
824
|
UIIP-PCO/BCO/W-479
|
(1) Estimate for Maintenance work of Natun bazar & Sikderpara road by BC Starting from BB road to DC road under Gopalganj's Pourashava (Ch00-622.00m+150.00m=772.00m) W-02 (2) Estimate for Improvement work of BC at Chachaniakandi road starting from Bypass to Mandertola road (Backchibari more) under Gopalganj's Pourashava. Ch00-738.00m
|
|
1.51
|
0.00
|
0.00
|
110.77
|
M/S Lalin Traders
|
81.79
|
18/04/2022
|
24/04/2022
|
17/04/2023
|
100
|
65.85
|
100
|
03/11/2024
|
|
234
|
Gopalganj
|
28
|
gopalganj-s
|
241
|
824
|
UIIP-PCO/BCO/W-478
|
Estimate for Maintenance work of SP Office road & Ahosan Uddin road and Mandertola road by BC starting from DC Office more to Bypass road Link road Quart Mosijd to Rumi House under Gopalganj's Pourashava (Ch00-2156.00m+158.00=2314.00m) W-07,08
|
|
2.31
|
0.00
|
0.00
|
116.59
|
M/S Lalin Traders
|
87.44
|
18/04/2022
|
24/04/2022
|
17/04/2023
|
100
|
87.34
|
100
|
03/11/2024
|
|
235
|
Gopalganj
|
28
|
gopalganj-s
|
241
|
824
|
UIIP-PCO/BCO/W-477
|
Estimate for Construction of RCC road & Drain at Marcus Mohalla Starting from Hanif Mia House to Education Office & Chatal L-791.00m W-09
|
|
0.79
|
0.00
|
0.00
|
102.75
|
M/S Kamrul and Brothers
|
76.04
|
18/04/2022
|
14/04/2022
|
17/04/2023
|
100
|
56.55
|
100
|
03/11/2024
|
|
236
|
Gopalganj
|
28
|
gopalganj-s
|
241
|
824
|
UIIP-PCO/BCO/W-204
|
1) Construction of BC Road at Sashan Road starting from Chapail road ti Poura Sashan L-186.00, W-9.
2) Construction of RCC road at Chapail road bylane starting from Chapail road to Nannu Molla house. L-300.00, wide-3.00m, W-09
3) Construction of RCC road at Shisuban bylane starting from Zella Nirbachon Office to Scout Bhaban, L-52.00m, Wide-4.50, W-09
4) Construction work of RCC at Dumping Center road starting from Chapail road to Dumping center under Gopalganj's Pourashava (ch. 00-250m) W-09.
|
|
0.60
|
0.00
|
0.00
|
110.50
|
M/S. Kamrul & Brothers
|
79.99
|
12/11/2020
|
19/11/2020
|
11/11/2021
|
100
|
64.50
|
100
|
03/11/2024
|
|
237
|
Gopalganj
|
28
|
gopalganj-s
|
241
|
824
|
UIIP-PCO/BCO/W-476
|
01. Estimate for Construction of RCC road & RCC Drain at Paddapukur starting form nearable Nowsar House to Banker Borhan House W-07
(2) Estimate for Construction of RCC raod at Bedgram Vajaler Math bylane starting from Sumon house to Salim Fakir House L-90.00m Wide-3.00m Word-01
(3) Estimate for Construction of RCC road at Sisubon starting from Mohila College Gate to Sheik Hasina Hostel L-126.00m Wide-2.50m Word-07
(4) Estimate for Construction of RCC Drain at Moulavipara Starting from Razu Mojahik to Nantu Khan House via Hizbulla house L-120.00m Word-01
(5) Estimate for Construction of 1) RCC road Karargati starting from Dhaka Khulna road to Doc Probir Banargy house L-73.00m,2) HBB Road Dhaka Khulna road to Roy Bari L= 165.00, w-3.00 word 01.
(6) Estimate for Construction of RCC Drain at Islambag starting from Md. Serajul Haque house to Nearable Islambag Mosque L-60m Word-08
|
|
0.50
|
0.00
|
0.00
|
80.95
|
M/S Nizam Traders
|
61.93
|
18/04/2022
|
24/04/2022
|
17/04/2023
|
100
|
51.44
|
100
|
03/11/2024
|
|
238
|
Gopalganj
|
28
|
gopalganj-s
|
241
|
824
|
UIIP-PCO/BCO/W-203
|
1) Construction of RCC Road at Chachaniakandi road bylane starting from Chachaniakandi road to Parimal Mozumdar House, Link-1 Triple House, Link-2 Abdur Rashid house. L-265m, Wide-2.00m, W-08 2) Construction of HBB road at Chachaniakandi road bylane starting from Chachaniakandi NSI house to Dhaka-Khulna Road, L-375m, W-08. 3) Construction of RCC road at Mohammadpara starting from Maleka Academi more to Asrom Road. L-310.00m, Wide(2.4+.80)= 3.20m, W-8
|
|
0.95
|
0.00
|
0.00
|
87.36
|
M/S. Saiful Traders
|
69.90
|
12/01/2020
|
|
11/11/2021
|
100
|
58.99
|
84
|
29/09/2022
|
|
239
|
Gopalganj
|
28
|
gopalganj-s
|
241
|
824
|
UIIP-PCO/BCO/W-202
|
1) Construction of RCC road & Drain at Biswas Bari road bylane starting from Biswas Bari road to professor Lutfor Rahman house. L-84.00m, wide-2.35m, W-4
2) Construction of HBB road at east Arambag starting from Dayud Mia house to Iqbal land via Kowsar Land. L-310m, wide-3.00m, W-04.
3) Construction of HBB road at East Arambag starting from Kowsar House to Naru Gopal House. L-126.00m, wide-3.00, W-4.
4) Construction of HBB road staring from Purbo Miapara bisha road to Purbo Arambag H/O Daud Mia H/O Tutul, W-04 under Gopalganj's Pourasahva. (ch. 0.00-550.00m)
|
|
1.07
|
0.00
|
0.00
|
17.71
|
M/S. Saiful Traders
|
64.21
|
12/11/2021
|
|
11/11/2021
|
100
|
57.96
|
90
|
29/09/2022
|
|
240
|
Gopalganj
|
28
|
gopalganj-s
|
241
|
824
|
UIIP-BC/PCO/W-11
|
(1) Construction of BSF road at Shaplabag starting from Shaplabag road to Court Mosjid Immam house, Link 1 Thanda Molla House to Montu Mia House, Link 2 Bipul Mondal House L-(210+182+46)=438m, Wide-2.00m, W-07 (2) Construction work of RCC Appron at Gopalganj's Pourashava Office vhabon Entry road under Gopalganj's Pourashava.(CH00-81.0m). Word no-07.
|
|
0.44
|
0.00
|
0.00
|
6.11
|
M/S. Nabiha Enterprise
|
64.92
|
03/09/2020
|
10/09/2020
|
02/09/2021
|
100
|
60.41
|
93
|
29/09/2022
|
|
241
|
Gopalganj
|
28
|
gopalganj-s
|
241
|
824
|
UIIP-BC/PCO/W-10
|
(1 Construction of RCC road at Arambag starting from Purabi house to Khakan Biswas House L-14m, Wide-2.00m, W-06
(2) Construction of RCC road at Amena School Road bylane starting from Amena School Gate to Israfil House L-132m, Wide-2.00m, W-06
(3) Construction of RCC road at Amena School Road bylane starting from Amena School Road to Rakib House L-60m, Wide-2.00m, W-06
(4) Construction of RCC road & M. Drain at Amena School Road bylane starting from Amena School Road to Tapos House L-57m, Wide-2.00m, W-06
(5) Construction of RCC road at Arambag (Bypass Connecting Road) bylane starting from Bypass Connecting Road to Jabber House L-105m, W-06
(6) Construction of RCC road at East Arambag (Santibag) bylane starting from Santibag Road to Alom House L-90m, W-06
(7) Construction of RCC road at Arambag Shamol Podder House to Monir Decotor House L-95m, W-06
(8) Construction of RCC road at Arambag starting Bairagi Khal to Sujan Bala House L-67m, Wide-2.00m, W-06
|
|
0.62
|
0.00
|
0.00
|
10.23
|
M/S. Niaz Traders
|
43.50
|
03/09/2020
|
10/09/2020
|
02/09/2021
|
100
|
27.70
|
64
|
29/09/2022
|
|
242
|
Gopalganj
|
28
|
gopalganj-s
|
241
|
824
|
UIIP-BC/PCO/W-09
|
(1) Construction of RCC road at Rokon Uddin Trust road starting from Mali Mother Shop to Kabir Master House L-111m, Wide-2.50m, W-03
(2) Construction of RCC road at Rokon Uddin Trust road starting from Ekramul Huda House to Fire Service bylane (Loclman) L-70m, Wide-2.00m, W-03
(3) Development of Abul Basher road by BC Starting from Miapara Mosque to Bokultola road, Ward-03, L=447, Wide 3.5m. (Ch. 0.00 to 447.0m.)
(4) Construction work of RCC Drain & Road at Bakultola starting from DC road to old RCC Drain under Gopalganj'sPourashava.(ch00-160.0m). word no-03
|
|
0.79
|
0.00
|
0.00
|
74.02
|
M/S. Nabiha Enterprise
|
55.04
|
03/09/2020
|
10/09/2020
|
02/09/2021
|
100
|
49.26
|
89
|
29/09/2022
|
|
243
|
Gopalganj
|
28
|
gopalganj-s
|
241
|
824
|
UIIP-BC/PCO/W-08
|
(1) Construction of RCC road & Drain at Gohata bylane starting from Gohata road to Md Rafiqul Islam House L-52m, Wide-2.00m, W-05
(2) Construction of RCC road & Cross Drain Gohata Bottola starting from Gohata road Bottola to Narayan Chandra Biswas House, L-63m, Wide-2.05m, W-05
(3) Construction of HBB road at Shaplabag road bylane starting from Shaplabag Road to Teacher Collone Drain, L-195m, W-07
(4) Construction of RCC Drain at Lichubagan starting from Tekka House to Natun School Road Drain L-64.500 Word -7
(5) Construction of RCC road & RCC Drain at Teacher Colloni Road bylane starting from Teacher Colloni More to Ulka Apa House L-270m, W-07
(6) Construction of RCC road at Natun Bazar starting from Word Councilor Biplob vi House Corner toTahaz Molla House L-76m, Wide-2.05m, W-02
|
|
0.66
|
0.00
|
0.00
|
90.51
|
M/S. Benojire Construction
|
69.65
|
03/09/2020
|
10/09/2020
|
02/09/2021
|
100
|
28.87
|
41
|
29/09/2022
|
|
244
|
Gopalganj
|
28
|
gopalganj-s
|
241
|
824
|
UIIP-BC/PCO/W-07
|
(1) Construction of RCC road at Kalabagan starting from Kalabagan road (NearableAnowar Manager House) to Refaul Land L-66.00, Wide-3.00m, Word -1
(2) Construction of RCC road at Moulavipara starting from Mazor Mizanur house to Sha-AlamMolla House L-180m, W-01
(3) Construction of RCC & BSF road at Near Vagelar Math starting from In front of Mani Mia House to Fair Service Back side Road L-(93+40+47)=180m, W-01
(4) Construction & Improvement work of CC road at Moulovipara bylane road starting from Musa Molla house to Saha Alom Molla house & link road under Gopalganj's Pourashava.(ch00-333.0m),w-01
(5) Improvement work of CC road at Mouloviparabylane road starting from Shohel house to Bitu Councilor house & link road under Gopalganj's Pourashava.(ch00-260.0m),w-01
|
|
1.02
|
0.00
|
0.00
|
95.16
|
M/S. Nabiha Enterprise
|
65.90
|
04/09/2020
|
|
07/09/2021
|
100
|
65.60
|
100
|
29/09/2022
|
|
245
|
Gopalganj
|
28
|
muksudpur
|
220
|
824
|
UIIP/PCO/G-57
|
Implementation & Supply 521 nos Waste Basket (120 ltr) & 25 nos Non-motorized vehicle (van) under Muksudpur Pourashava District: Gopalganj.
|
|
|
|
1.00
|
40.00
|
RFL Plastics Limited
|
26.28
|
|
|
|
0
|
0.00
|
0
|
03/11/2024
|
|
246
|
Gopalganj
|
28
|
muksudpur
|
220
|
824
|
UIIP-BC/PCO/W-605
|
Improvement of RCC road from Munsur Munsi House( Mia Bari mosjid to south mia bari road) to Mojibur Mollah (chourongi road to Atadanga road) with 03 nos RCC cross drain and 68 m RCC palisading at ward no. 05 under Muksudpur Paurashava. (Total Length=288m)
|
|
0.29
|
|
|
55.46
|
M/S Arafat Traders-Alam Shikder Construction Ltd.
|
48.24
|
15/05/2023
|
16/05/2023
|
15/05/2024
|
100
|
46.69
|
100
|
03/11/2024
|
|
247
|
Gopalganj
|
28
|
muksudpur
|
220
|
824
|
UIIP-BC/PCO/W-541
|
A) Construction of One no. Shed for Public Transport Passenger (28.00sqm) in South Candibordi, Ward No.04, Under Muksudpur Pourashava, Dist: Gopalganj.
B) Construction of One Storied Public Toilet (Type A=56.00sqm) near Kamlapur Bus Stand, Ward No.07, Under Muksudpur Pourashava, Dist: Gopalganj.
|
|
|
|
2.00
|
46.95
|
M/S Arafat Traders-Alam Shikder Construction (JV)
|
46.95
|
15/02/2023
|
20/02/2023
|
20/02/2024
|
79
|
25.09
|
53
|
03/11/2024
|
|
248
|
Gopalganj
|
28
|
muksudpur
|
220
|
824
|
UIIP-BC/PCO/W-535
|
A) Improvement of road by RCC from Mohammad Ali Sheikh house to Moiur Ali Mia House at Gopinathpur ward No.-05 Under Muksudpur Pourashava, Gopalganj (L=310m)
B) Improvement of road by RCC from Dulal Munsi house to M.A. Khalek Govt. Primary School at Lokheirchar at ward No.-01 under Muksudpur Pourashava, Gopalganj (L=250m)
C) Improvement of road by RCC from Rejaul Sheikh house to Kiramot house at Provakordi at ward No-02 under Muksudpur Pourashava, Gopalganj (L=150m)
|
|
|
|
|
64.08
|
M/S Arafat Traders-Alam Shikder Construction (JV)
|
63.94
|
15/02/2023
|
20/02/2023
|
20/02/2024
|
100
|
52.63
|
82
|
03/11/2024
|
|
249
|
Gopalganj
|
28
|
muksudpur
|
220
|
824
|
UIIP-BC/PCO/W-391
|
(A) Construction of RCC Drain in Gopinathpur Salim Sarder’s house to Karitas Office Khal via Link Drain Sazzad mia’s house at Ch.00 to 750m Starting From Ch.00.00-400.00 Width=1000mm, Hight= 1750mm (avg) Total Length=750m (Word No.05)
|
|
|
|
|
195.95
|
M/S. Kamrul & Brothers
|
195.05
|
07/07/2022
|
07/07/2022
|
30/05/2024
|
95
|
111.55
|
57
|
03/11/2024
|
|
250
|
Gopalganj
|
28
|
muksudpur
|
220
|
824
|
UIIP-BC/PCO/W-277
|
(1) Improvement of road by BC from Provakurdi Faruk Sheikh house to Naryan Member house word no-3 at Muksudpur paurashava Gopalganj's. L=660.00m.(2) Improvement of road by BC from Provakordi main road to Nobin Chondra road via Boro Bari Madrasha (word no-2) at Muksudpur paurashava, Gopalganj's. L=726.00m.(3) Improvement of road by BC from Bishow road to Nagar Sundordi Tushar Mia house word no-3 at Muksudpur paurashava Gopalganj's. L=460.00m.(4) Improvement of road by BC from Provakurdi main road to Tara mia house word no-2 at Muksudpur paurashava Gopalganj's. L=390.00m.
|
|
2.24
|
0.00
|
0.00
|
131.95
|
M/S. Benojire Construction
|
105.68
|
09/11/2021
|
09/11/2021
|
09/11/2021
|
100
|
105.50
|
100
|
03/11/2024
|
|
251
|
Gopalganj
|
28
|
muksudpur
|
220
|
824
|
UIIP-BC/PCO/W-276
|
(1) Improvement of road by BC from Provakordi Muslem Khandaker house to Mohiuddin house (word no-2) at Muksudpur paurashava, Gopalganj's. L=426.00m. (2) Improvement of road by BC Part-A: From Lakhayerchar Main BC road to Kalimondir, L= 150.00m. Part-B: From Lakhayerchar Main BC road to River Ghat, L= 650.00m (word no-01) at Muksudpur paurashava, Gopalganj's. Total Length = 800.00m. (3) Improvement of road by BC From Bisshow road Gopinathpur Sugom Madrasa (Word no-5) at Muksudpur paurashava, Gopalganj's. L=340.00m.
|
|
1.57
|
0.00
|
0.00
|
123.92
|
M/S. Benojire Construction
|
101.59
|
09/11/2021
|
09/11/2021
|
09/11/2022
|
100
|
101.59
|
100
|
03/11/2024
|
|
252
|
Gopalganj
|
28
|
muksudpur
|
220
|
824
|
UIIP-BC/PCO/W-275
|
(1) Improvement of road by RCC from Tangrakhola Khal Par road to Hunnan mia house word no-6 at Muksudpur paurashava Gopalganj's. L=510.00m.(2) Improvement of road by RCC from Komlapur Zahad mia house to Oli mollahs house word no-7 at Muksudpur paurashava Gopalganj's. L=200.00m. (3) Improvement of road by RCC from Komlapur Mozibur sarder house to komlapur Abdul hi house word no-8 at Muksudpur paurashava Gopalganj's. L=820.00m. (4) Improvement of road by RCC from Gopinathpur BC road near mamun shops to Munshi Bari (word no-5) at Muksudpur paurashava, Gopalganj's. L=150.00m.
|
|
1.68
|
0.00
|
0.00
|
205.49
|
NISHIT-SHOWROVE JV
|
177.57
|
06/12/2021
|
06/12/2021
|
06/12/2022
|
100
|
177.57
|
100
|
03/11/2024
|
|
253
|
Gopalganj
|
28
|
muksudpur
|
220
|
824
|
UIIP-BC/PCO/W-390
|
1 . Improvement of Golabaria Singboard-Vandaria road at CH 00 to 700m by 25mm Dense Carpeting W0rd No 09 Lenght 700m;2. Construction of Kamlapur-Dorika Dagga road at CH 00 to 670m by 25mm Dense Carpeting with ASS Word No 08. Lenght 670m;3. Construction of 4.50 X 4.50m RCC Box Culvert in Kamlapur-Dorika Dagga road near Harir Vuy Word No 08 in same road; 4. Construction of Dr.Boloram house road in Kamlapur Starting from Kamlapur Bus Stand to Muksudpur-Jalil par-Ujani road by RCC at Ch. 00 to 400m Word No 07 Length 400m
|
|
1.77
|
0.00
|
0.00
|
157.14
|
M/S. Kamrul & Brothers
|
157.14
|
04/09/2021
|
16/09/2021
|
16/09/2022
|
100
|
157.14
|
100
|
29/09/2022
|
|
254
|
Gopalganj
|
28
|
muksudpur
|
220
|
824
|
UIIP-BC/PCO/W-105
|
1. Improvement of road by BC from Komlapur khodakar Bazar Chand hat road to Baroy para Shaha bari Woard no-8 at Muksudpur Paurashava Gopalganj's. L=390.00m (2) Improvement of road by BC from Komlapur Whahed Fakir house to Hobu mia house via Hannan houseWoard no-7 at Muksudpur Paurashava Gopalganj's. L=210.00m. (3) Improvement of road by BC from Tangrakhola Battala road Rawshon mia house to khalper via Sobuj Mia & Akram Chowdhory House Woard no-6 at Muksudpur Paurashava Gopalganj's. L=513.00mand(4) Improvement of road by BC from Golabaria Sign Board R&H way to End of Paura Boundary Via Vandaria Mohammad Kha & Hobi Mollah house Woard no-9 at Muksudpur Paurashava Gopalganj's. L=600.00m
|
|
1.71
|
0.00
|
0.00
|
130.76
|
M/S. Showrove Traders
|
112.45
|
13/09/2020
|
|
19/09/2021
|
100
|
112.45
|
100
|
29/09/2022
|
|
255
|
Gopalganj
|
28
|
muksudpur
|
220
|
824
|
UIIP-BC/PCO/W-104
|
1 Improvement of road by RCC from Gopinathpur X-Upazila Chairman House to Muksudpur Collage Woard no-5 at Muksudpur Paurashava Gopalganj's. L 450.00m.2 Improvement of road by RCC from Komlapur Year Ali house to Battala via South Para Jame Mosque Woard no-7 at Muksudpur Paurashava Gopalganj's. L 385.00m.3 Part-A Improvement of Road by RCC with RCC Drain from Chondibordi Ripon Kha house to Sorowar Khan house Woard no-4 at Muksudpur Paurashava Gopalganj's. L122.00m.-B Construction of RCC Drain from Sonali Bank to Fish Market via Samim Mollah House Woard no-4 at Muksudpur Paurashava Gopalganj's. L175.00m Total-L297.00m
|
|
0.84
|
0.00
|
0.00
|
123.60
|
M/S. Showrove Traders
|
106.29
|
13/09/2020
|
|
19/09/2021
|
100
|
106.25
|
100
|
29/09/2022
|
|
256
|
Gopalganj
|
28
|
tungipara
|
232
|
824
|
UIIP/PCO/G-56
|
Estimate of implelemtation of 634.00 nos Waste Basket (120 ltr) & 18.00 nos Non-motorized vehicle (van) under Tungipara Pourashava District: Gopalganj.
|
|
|
|
1.00
|
39.95
|
RFL Plastrics Limited
|
28.91
|
21/03/2024
|
27/03/2024
|
28/09/2024
|
0
|
0.00
|
0
|
03/11/2024
|
|
257
|
Gopalganj
|
28
|
tungipara
|
232
|
824
|
UIIP-PCO/BCO/W-604
|
(A) Construction of RCC Road at Near by H/O Mr. Tutul Sikdar to Tungipara Bypass Road 01 no Gate at Ch.0.00 to 144.00m under Tungipara Pourashava , Gopalganj. (Salvage Amount=14,165.00).
(B) Construction of RCC Road Starting from Sardarpara Primary School Near by H/O Mr. Sheikh Tuhin at Ch. 0.00 to 132.00m under Tungipara Pourashava , Gopalganj.
(B) Construction of RCC Cover Drain work Near by Poura Bhaban at Ch. 0.00 to 180.00m Ward no. 02 under Tungipara Pourashava , Gopalganj.
|
|
|
|
|
93.76
|
|
0.00
|
|
|
|
0
|
0.00
|
0
|
03/11/2024
|
|
258
|
Gopalganj
|
28
|
tungipara
|
232
|
824
|
UIIP-PCO/BCO/W-490
|
(A) Construction of RCC Cover Drain cum RCC Road with 100mm dia uPVC Water Supplying Line at 4 No Ward starting from Near the Gov Quarter Chairman up to East Tungipara main Road Ch: 0-480.00m)
(B) Construction of RCC Cover Drain cum RCC Road starting from Nearby Upazila Mosque South West Corner at Ward No 04 up to Kazibari Ch:0-150.00m Total Length-630.00m Under Tungipara Pourashava Tungipara District: Gopalganj
|
|
|
|
|
262.79
|
M/S. Mahmud Haque
|
219.42
|
02/02/2023
|
02/02/2023
|
13/04/2024
|
73
|
79.81
|
36
|
03/11/2024
|
|
259
|
Gopalganj
|
28
|
tungipara
|
232
|
824
|
UIIP-PCO/BCO/W-489
|
(A) 2 No Ward Construction of RCC Cover Drain starting from Nearby H/O Mr. Kamrul Sheikh to Hazibari Ghat Ch:0-250.00m)
(B) 6 No Ward Construction of RCC Cover Drain starting from Near By H/O Mr. Tabibur to Sarderpara Main Drain Ch: 0-80.00m
(C) 4 No Ward Construction of RCC Cover Drain cum RCC Road starting from Nearby Food Godown Road to H/O Gazibari Ch:0-130.00m
(D) 4 No Ward Construction of RCC Cover Drain cum RCC Road starting from Near By Food Godown Road to H/O Mr. Mahan Ch: 0-130.00m Under Tungipara Pourashava Tungipara District: Gopalganj
|
|
|
|
|
197.43
|
M/S. Mahmud Haque
|
161.86
|
02/02/2023
|
02/02/2023
|
13/04/2024
|
61
|
72.19
|
45
|
03/11/2024
|
|
260
|
Gopalganj
|
28
|
tungipara
|
232
|
824
|
UIIP-PCO/BCO/W-488
|
(1) Construction RCC Road starting From (a) Sardarpara RHD main Road to Near the House of Mr. Mohammad Ali Fakir at Ward No-06 Ch0-70 (b) Sardarpara RHD Main Road to Near the House of Mr. Golam Rosul via Mr. Lotif House With Retaining Wall & 3 Nos Link Road at Ward No-06 Under Tungipara Pourashava Dist: Gopalganj's Ch 0-180m Total Length (70+180)=250m. (2) Construction RCC Road starting From (a) Patgati Kitchen Market Road to Patgati Animal Yard of length 165.00m (b) Patgati Kitchen Market Road near The House of Mr. Robiul upto patgati Animal Yard at Ward No-09 of Length 46.00m Under Tungipara Pourashava Dist: Gopalganj's Total Length=211.00m
|
|
0.46
|
0.00
|
0.00
|
127.80
|
Md. Babul sheikh
|
134.10
|
12/06/2022
|
15/06/2022
|
11/06/2023
|
100
|
129.64
|
100
|
03/11/2024
|
|
261
|
Gopalganj
|
28
|
tungipara
|
232
|
824
|
UIIP-PCO/BCO/W-487
|
(1) Construction RCC Drain starting From Patgati Sadarpara beside the Mr. Billal Hossain house to RDH By Pass Road Side Khal at Ward No-07 Under Tungipara Pourashava Dist: Gopalganj's (Main Drain 220m Link 120m) Total Length 340.00m (2) Construction RCC Drain starting From Infront of Patgati Bottola Mondir To Patgati Khal With RDH Crossing at Ward No-09 Under Tungipara Pourashava Dist: Gopalganj's (Main Drain 105m Cross 2nos (20+25=45) Total Length 150.00m.
|
|
|
0.00
|
0.00
|
136.61
|
M/S. S.S Traders
|
143.22
|
12/06/2022
|
15/06/2022
|
11/06/2023
|
100
|
139.23
|
100
|
03/11/2024
|
|
262
|
Gopalganj
|
28
|
tungipara
|
232
|
824
|
UIIP-PCO/BCO/W-03
|
Contruction RCC Drain Starting from Kazi Eyad Ali House to House of Mr. Babul Master at Ward no-05 Under TungiparaPourashava Gopalganj's. Ch0.00-195.000m
Contruction RCC Drain Starting from Kazi Anower House to Gimadangi Khal at Keraikopa Ward No 02 Under Tungipara Pourashava Gopalganj's. Ch0.00-115.000m
Contruction RCC Drain Starting from Kazi Deloar Brother House to House of Kazi Anower at Keraikopa Wadr No-02 Under Tungipara Pourashava Gopalganj's. Ch0.00-120.000m
Contruction RCC Drain Starting from Kurdus Sheikh House to Tungipara Khal at Ward No-05 Under Tungipara Pourashava Gopalganj's. Ch0.00-50.000m.
Construction of RCC Drain Starting from Sheikh Buranuddin House upto Sheikh Kabir Sir at Tungipara Under Tungipara Paurashava Gopalganj's. Ch 0.00-60.00m”
|
|
|
0.00
|
0.00
|
131.26
|
Md. Babul sheikh
|
98.33
|
08/12/2020
|
09/12/2020
|
30/03/2022
|
100
|
51.31
|
100
|
03/11/2024
|
|
263
|
Gopalganj
|
28
|
tungipara
|
232
|
824
|
UIIP-PCO/BCO/W-02
|
Construction of RCC Drain Starting from the End of CCTF RCC Drain in front of Milk vita Store by the side of Patgati Main Road upto RHD Tungipara-Gopalganj's Main Road Near by Modumoti Counter at Ward no-08 Under Tungipara Pourashava Gopalganj's. Drain Ch0-310.00m.
|
|
|
0.00
|
0.00
|
77.00
|
Md. Babul sheikh
|
61.55
|
12/08/2020
|
19/08/2020
|
30/03/2022
|
100
|
61.55
|
100
|
03/11/2024
|
|
264
|
Gopalganj
|
28
|
tungipara
|
232
|
824
|
UIIP-PCO/BCO/W-06
|
1. Construction of H.B.B Road Starting from Sheikh Hasina Gate to modhumoti River Ghat With Animal Yard at ward no-09 under Tungipara Paurashava.(L=460.00m) 2. Construction of H.B.B Road Starting from New Bus Terminal New gate to RHD Akkas Saw Mill Raod at ward no-09 under Tungipara Paurashava, L=180m.
|
|
0.64
|
0.00
|
0.00
|
112.41
|
Md. Babul sheikh
|
79.42
|
08/12/2020
|
09/12/2020
|
08/11/2021
|
100
|
72.93
|
92
|
29/09/2022
|
|
265
|
Gopalganj
|
28
|
tungipara
|
232
|
824
|
UIIP-PCO/BCO/W-05
|
Part -A: Construction of RCC Drain Starting from Tungipara poura Water plant Vaia Mr. Asarot/ Kinar Molla House to Baghin River at Word no-03. Part -B : Construction of RCC Drain Starting from Purbo Tungipara Billal Molla House side Baghia River at Word No-03 Under Tungipar pourashava. Gopalgang ch. 00-215m.
|
|
|
0.00
|
0.00
|
53.78
|
Md. Babul sheikh
|
38.48
|
08/12/2020
|
09/12/2020
|
30/03/2022
|
100
|
29.29
|
76
|
29/09/2022
|
|
266
|
Gopalganj
|
28
|
tungipara
|
232
|
824
|
UIIP-PCO/BCO/W-04
|
Part 01. Construction of RCC Road Starting from Patgati old Bus-stand Road via Manik Mia super Murket upto Modhumati Clinic Via Joglul House at Word no-08 ( Ch. 0.0 to Ch. 289.00 m ) ( L= 289.00 m ) Part 02 . Reabilitation of Road by RCC Starting from Sheikh Salim House to Gubtola Bridge at Ward no-05 Under Tungipara Pourashava (L=165m).
|
|
0.45
|
0.00
|
0.00
|
74.96
|
M/S. Monir Traders
|
55.02
|
08/12/2020
|
09/12/2020
|
08/11/2021
|
100
|
55.01
|
100
|
29/09/2022
|
|
267
|
Gopalganj
|
28
|
tungipara
|
232
|
824
|
UIIP-PCO/BCO/W-01
|
A. Construction of RCC Road Startingfrom 2 No Gate Mausoleum RHD Road Near the House of Mr.Juber Sheikh to H/O Mr. Chalim Miah at Sardarpara Under Tungipara Pourashava Gopalganj's. Road Ch 00-320.00m
B Construction of RCC Road Starting from Sarder at Near theHouse of Mr. Rakib Sheikh to H/O Mr. Rabiul Miah atSarderpara at Aard No-06 Under Tungipara PourashavaGopalganj's Road ch 0-200.00m
A. Construction of RCC Road Startingfrom Kerailkopa Main Road to H/O Kazi Dulal at KerailkopaUnder Tungipara Pourashava Gopalganj's. Road Ch 00-120.00m
B. Construction of RCC Road Starting from Kerailkopa Main. Road to H/O Kazi Azad Hossain at Kerailkopa UnderTungipara Pourashava Gopalganj's. Road Ch 00-60.00m
C Construction of RCC Road Starting from 2 No Gate RHD toH/O Mr. Mahabub Hossain at Sardarpara Under TungiparaPourashava Gopalganj's. Road Ch 00-60.00m.
D Construction of RCC Road Starting from Patgati Main to Patgati Jame Mosquest at Patgati Under TungiparaPourashava Gopalganj's. Road Ch 00-70.00m.
|
|
0.83
|
0.00
|
0.00
|
94.25
|
Md. Babul sheikh
|
74.27
|
03/09/2020
|
10/09/2020
|
02/09/2021
|
100
|
74.27
|
100
|
29/09/2022
|
|
268
|
Jamalpur
|
27
|
jamalpur-s
|
204
|
824
|
UIIP/PCO/G-60
|
Implementation & Supply 648 nos Waste Basket (120 ltr) & 15 nos Non-motorized vehicle (van) under Jamalpur Pourashava District: Jamalpur.
|
|
|
|
1.00
|
38.45
|
RFL Plastrics Limited
|
27.60
|
|
|
|
60
|
15.00
|
54
|
18/11/2024
|
|
269
|
Jamalpur
|
27
|
jamalpur-s
|
204
|
824
|
UIIP-BC/PCO/W-636
|
1. Construction of shed for Public transport Passenger at Shekhervita railcrossing Under Jamalpur Pourashava, Jamalpur.
2. Construction of single Storied public toilet Building (Type A) at Sofimia Bazer Jamalpur Pourashava, Jamalpur
|
|
|
|
|
55.81
|
|
0.00
|
|
|
|
0
|
0.00
|
0
|
18/11/2024
|
|
270
|
Jamalpur
|
27
|
jamalpur-s
|
204
|
824
|
UIIP-BC/PCO/W-613
|
Construction of one storied Vegetables & agricultural Products market on 5 storied foundation at jongolpara Boardghar under Jamalpur Pourashava Jamalpur. (Floor Area-254 sqm)
|
|
|
|
1.00
|
124.97
|
M/S Mirza Construction
|
124.90
|
07/09/2023
|
07/09/2023
|
07/08/2024
|
75
|
51.09
|
41
|
18/11/2024
|
|
271
|
Jamalpur
|
27
|
jamalpur-s
|
204
|
824
|
UIIP-BC/PCO/W-452
|
Construction of 22.00m RCC Bridge on Tetulia-Hazipur Road at Jamalpur Pourashava, District Jamalpur
|
|
|
22.00
|
0.00
|
241.43
|
Bilkis Enterprise- Mirza Construction
|
217.36
|
16/06/2022
|
|
16/06/2023
|
100
|
217.35
|
100
|
05/11/2024
|
|
272
|
Jamalpur
|
27
|
jamalpur-s
|
204
|
824
|
UIIP-BC/PCO/W-299
|
Imporvement of Road By RCC Starting from infront of Bakultola Pubali Bank Mour to Pach Rasta Mour via Nayapara Mour (Ch: 0.00-875.00m under Jamalpur Pourashava Jamalpur.
|
|
0.88
|
0.00
|
0.00
|
307.70
|
SRS Construction
|
306.53
|
20/09/2021
|
28/09/2021
|
20/09/2022
|
100
|
306.40
|
100
|
05/11/2024
|
|
273
|
Jamalpur
|
27
|
jamalpur-s
|
204
|
824
|
UIIP-BC/PCO/W-178
|
(B) Construction of RCC Road Starting from Infront of Jamalpur Zilla School to College Road (Soyed Abdus Subhan Sarak) via Amlapara IRP ch 00-340m & Link Road starting from Amlapara IRP to Lichutola Mour ch 00-125m under Jamalpur Pourashava, Dist: Jamalpur. (A) Construction of RCC Drain Starting from Infront of Jamalpur Zilla School to College Road (Soyed Abdus Subhan Sarak) via Amlapara IRP ch 148-340m & Link Road starting from Amlapara IRP to Lichutola Mour ch 00-125m under Jamalpur Pourashava, Dist: Jamalpur.
|
|
0.47
|
0.00
|
0.00
|
165.83
|
M/S A.K.M. SHAHABUDDIN SK
|
128.17
|
24/09/2020
|
01/10/2020
|
30/09/2021
|
100
|
127.20
|
99
|
29/09/2022
|
|
274
|
Jamalpur
|
27
|
jamalpur-s
|
204
|
824
|
UIIP-BC/PCO/W-177
|
Construction of RCC Drain with cover slab starting from Pathaliya Guabariya Switch Gate to Compopur ch 1700-2660m. & 02 No X-Drain at ch 1800m & ch 2640m Under Jamalpur Pourashava. Dist Jamalpur
|
|
|
0.00
|
0.00
|
149.92
|
M/S Laboni Enterprise - M/S.Farhan Enterprise [JV]
|
119.42
|
24/09/2020
|
01/10/2020
|
30/09/2021
|
100
|
119.09
|
100
|
29/09/2022
|
|
275
|
Jamalpur
|
27
|
jamalpur-s
|
204
|
824
|
UIIP-BC/PCO/W-72
|
Improvement of Road by DBC & RCC Starting from Pathaliya Guabariya Sluice Gate to Compopur Ch0.00-2650.00m Under Jamalpur Pourashava. Dist Jamalpur.
|
|
2.65
|
0.00
|
0.00
|
318.52
|
Islam Construction - MN Trade - Farhan Enterprise (JV)
|
282.37
|
07/09/2020
|
14/09/2020
|
13/09/2021
|
100
|
282.33
|
100
|
29/09/2022
|
|
276
|
Jashore
|
41
|
abhoynagar
|
287
|
824
|
UIIP-BC/PCO/W-612
|
Construction of Public Transport Passenger Shed (28.00sqm) at Bhanga Gate Bazar in Word No-01 Under Nowapara Pourashava.
Construction of Public Transport Passenger Shed (28.00sqm) at Rajghat Bus Stand in Word No-08 Under Nowapara Pourashava.
|
|
|
|
|
27.99
|
|
0.00
|
|
|
|
0
|
0.00
|
0
|
18/11/2024
|
|
277
|
Jashore
|
41
|
abhoynagar
|
287
|
824
|
UIIP/PCO/G-63
|
Implelemtation of 500.00 nos Waste Basket 920 ltr) & 26 nos Non-motorized vehicle (van) under Noapara Pourashava District: Jashore.
|
|
|
|
1.00
|
39.79
|
RFL Plastics Limited
|
28.71
|
07/02/2024
|
20/02/2024
|
20/05/2024
|
90
|
15.00
|
52
|
18/11/2024
|
|
278
|
Jashore
|
41
|
abhoynagar
|
287
|
824
|
UIIP-BC/PCO/W-609
|
1. Improvement of BC Road from Dhopadi Ulu Bottala to Dhopadi Charatala Road Via Nurani Madrasha at Ch. 0+00-1+886= 1886.00m at Ward No:03 Under Nowapara Pourashava.
2. Improvement of BC Road from Nowapara College Road to Buikara Govt. Primary School at Ch.0+00-0+946.00m at Ward No- 06 & 07 Under Nowapara Pourashava.
"3. Improvement of Buinkara Purabari BC Road Ch.0+00-0+646.00m and Link 01: Buinkara Sahadat House to Imran House side Road (Purabari) at Ch. 0.00-196.00m at Ward No:05 Under Nowapara Pourashava and Palisading work at (a) Samsul Haque Road at Ch. 0+400-0+430 (L/S) & Ch.0+400-0+420 (R/S) (b) Ekterpur Jamader Bari Road at Ch.00-25.00 (R/S) (C) Gazipur Buri Hattola Ch.390.00-415.00(R/S)
(Total Salvaged Amount=20,46,075.00 for Package)"
|
|
3.48
|
|
|
296.06
|
Nishit Bosu
|
325.31
|
16/08/2023
|
28/08/2023
|
27/08/2024
|
99
|
164.48
|
51
|
18/11/2024
|
|
279
|
Jashore
|
41
|
abhoynagar
|
287
|
824
|
UIIP-BC /PCO/W-373
|
(1) Improvement of road by BC from Jashore-Khulna Road to Nowapara Cement Mill Via Uttara Group Under Nowapara Pourashava,ch0+00-0+350.00=350.00m out of Ch 900.00m
(2)Construction of 2 (Two) Nos RCC road Cross Box Culvert ch 05m & ch 270m Near Uttora Group of Nowapara HimaloyCement millroad size 12.00x1.00x1.600.
(3)Improvement of BC Road from Nowapara Mini Bazar to Rupsha Poltry Road Ch0+00-0+440m.Out of Ch580.00m.Ward no-04
(4) Construction of 1 One Nos RCC Cross Drain Size -6.00x1.00x1.00 At Ch 02m.At BC Road from Nowapara Mini Bazar to Rupsha Poltry Road.
(5)Improvemnt of Road by BC from Pond of Mrs. Kala Buri to Maha Sashan Road at Kabiraj Paara Under Nowapara Pourashava,ch0+00-0+580.00m Ward No-02.
(6)Construction of 2 (Two) Nos RCC road Cross Drain from Pond of Mrs. Kala Buri to Maha Sashan Road at Kabiraj Para Size -6.00x1.00x1.00 at Ch 02m & Ch 577m Under Nowapara Pourashava Ward No-02.
(7)Construction of 1 (one) Nos RCC road cross Box Culvert at By pass Road Near Shop of Mr.Raihan CRDP/W-1 Under Nowapara Pourashava Size-10.00x1.000x2.000.
(8) Construction of RCC Drain cum Footpath of Mohila College and Girls School area at Guakhula at Ch 01) 0+00-0+210m, 02)0+00-0+071m, 03)0+00-0+035m 05)0+00-0+045m under Nowapara Pourashava.
|
|
1.37
|
52.00
|
0.00
|
246.61
|
M/S. SAIFUL HASAN JOARDAR
|
256.88
|
21/07/2022
|
04/08/2022
|
03/08/2023
|
96
|
200.02
|
78
|
18/11/2024
|
|
280
|
Jashore
|
41
|
abhoynagar
|
287
|
824
|
UIIP-BC /PCO/W-372
|
(1) Improvement of Hospital Road by lane by RCC from Nowapara Puls Clinic to H/o. Mr. Harun/ Sahana Bilash C h 0+000-0+340m.out of 450m.Ward No-05.
(2 )Construction of RCC drain by the side of Hospital road from Nowapara Puls Clinic to H/o. Sahana Bilash Ch 0+000-0+340m.out of 450m.Ward No-05.
(3)Construction of 4 (Four) Nos RCC road Cross Drain Type-E size- 3.00mx0.400x0.600 at Ch 0+05m, 0+195m,0+300m & 0+335m of Hospital road from Nowapara Puls Clinic to H/o. Sahana Bilash Ward No-05.
(4)Construction of 2 (Two) Nos 12m RCC road Cross Box Culvert at Entry of Nowapara Rail Station In and Out Size-1.600x1.600.
(5) Construction of RCC Drain cum Footpath at Clinic Para from H/o. Mr.Modesser to Hospital road via H/o.Mst.Morzina and H/o Mr. Monju Ch 01) 0+00-0+131m, 2)0+00-0+031m 03) 0+00-0+020m.
(6)Construction of RCC Drain from S/o. MARCEL Show Room to H/o.Mr.Dulu at Ch 0+00-0+170m.
(7) Improvement of RCC road From S/o.MARCEL Showroom to H/o. Mr.Dulu at Ch 0+00-0+110m.
(8) Improvement of Peer Bari Majar to Jashore-Khulna road Via Abhaynagar Upozilla Office at Ch 0+00-0+660m Ward No-06.
(9) Construction of RCC Drain by the side of Peer Bari Majar to Jashore-Khulna road Via Abhaynagar Upozilla Office at Ch 0+00-0+660m Ward no-06
(10) Improvement of RCC road from Jashore-Khulna road to H/o.Mr.Mustain via Mr. Kosi Huzur at Ch 0+00-0+150m.
(11) Construction of RCC Drain from Jashore-Khulna road to Southern School via H/o Mr. Mustain and Mr.Kosi Huzur at Ch 0+00-0+200m
(12) Construction of RCC Drain from H/o.Mr. Musa to Bypass road Via H/o.Mr. Goutom at Ch 0+00-0+160m
(13 )Construction of 1 One RCC Box Culvert at Bypass road Near H/o.Mr. Goutom Size 10.00x1.00x1.600 under Nowapara Pourashava.
|
|
1.26
|
46.00
|
0.00
|
291.40
|
M/S. SAIFUL HASAN JOARDAR
|
302.64
|
21/07/2022
|
04/08/2022
|
03/08/2023
|
84
|
180.90
|
60
|
18/11/2024
|
|
281
|
Jashore
|
41
|
abhoynagar
|
287
|
824
|
UIIP-BC/B25:B31PCO/W-195
|
(1) Improvement of BC road from Taltola Jamader Bari LGED Road to H/o. Siddique at Ekterpur under Nowapara Paurashava at Ch 0+000-0+310m.
(2) Improvement of By pass road from Model School to H/o. Mr. Aslam under Nowapara Paurashava at ch 0+000-0+475m ward No-06.
(3) Improvement of BC Road road from Koila Ghate School to Ropsha Poltri road under Nowapara Paurashava at Ch 0+000-0+550m.
(4) Improvement of BC road from JK road Ratkhola Mondir to Dham Road Via H/o. Mr. Ali Sir under Nowapara Paurashava at Ch 0+000-1+250m, Ward No-01.
(5) Construction of 2 (Two) nos RCC cross Drain (size-6.00x1.00x1.00) at Ch 0+050m & Ch 0+305m at Taltola Jamader Bari under Nowapara Paurashava.
(6) Construction Of 2 (Two) Nos RCC Cross Drain (size-6.00x1.00x1.00) at Ch 0+050m & ch 0.00+540m at Koila Ghate School Road under Nowapara Paurashava
|
|
1.46
|
24.00
|
0.00
|
158.55
|
M/S Y A Khan
|
134.50
|
17/09/2020
|
24/09/2020
|
25/05/2022
|
100
|
124.78
|
100
|
18/11/2024
|
|
282
|
Jashore
|
41
|
abhoynagar
|
287
|
824
|
UIIP-BC/PCO/W-194
|
(1) Improvement of BC road from Gazipur Moddo Para Mosque to Johor Ali Golder House at Ch 0+00-0+350m and Link Monjur Gazi House to South Para Jame Mosque under Nowapara Paurashava at Ch 0+000-0+250m (Total Length=600m).
(2) Improvement of BC Road from Gazipur Tarun Songo to Pouro Last area Lutfor Sheikh House at Ch 0+000-0+370m. under Nowapara Paurashava Total Length=370m (Ward No-8).
(3) Improvement of BC Road from Gazipur Buri Battala Jame Mosque to Sarder Para Jame Mosque at Ch 0+000-0+750m, and Link Mojher Ali House to Gofur Sheik House at Ch 0+000-0+160m Total (Length=910.00m) under Nowapara Paurashava, Ward No-8.
(4) Construction Of 2 (Two) Nos RCC cross Drain (size-6.00x1.00x1.00) at Ch 0+50m & 0+305m, under Nowapara Paurashava.
|
|
1.88
|
12.00
|
0.00
|
148.93
|
M/s Y. A. Khan
|
126.46
|
17/09/2020
|
|
25/05/2022
|
100
|
124.44
|
100
|
18/11/2024
|
|
283
|
Jashore
|
41
|
abhoynagar
|
287
|
824
|
UIIP-BC/PCO/W-26
|
(1) Improvement of BC Road from Rajghat JK road to JJI 2no Gate Under Nawapara Paurashava at ch 0+000-0+450m
(2) Improvement of BC road from H/o Mr.Sumsul Haque to Pouro Last Area under Nowapara Paurashava at Ch 0+000-0+650m
(3) Improvement of BC road from Mollamtola Molla Para Eid Goa to Ahad Ali Biswas House under Nowapara Paurashava at Ch 0+000-0+350m
(4) Construction Of 2 (Two) Nos RCC Box Drain (size-6.000x1.00x1.00) at Ch 0+05m & 0+240m, Parashava: Nowapara , District: Jashore
(5) Construction Of 01 (One) Nos RCC Box Drain (size-6.000x1.000x1.000) at Ch 0+350m), Parashava: Nowapara , District: Jashore
|
|
1.45
|
18.00
|
0.00
|
106.12
|
SI & SC JV
|
91.37
|
08/06/2020
|
15/06/2020
|
17/10/2021
|
100
|
89.80
|
100
|
18/11/2024
|
|
284
|
Jashore
|
41
|
abhoynagar
|
287
|
824
|
UIIP-BC/PCO/W-25
|
(1) Improvement of BC road from Shashan Ghat to Dhopadi Chashi Club more Under Nowapara Paurashava at Ch 0+000-2+000 = 2000.00m (Ward No-04). (2) Improvement of BC road from Dhopadi Chashi Club to H/o. Mr. Mojid Biswas Via Dhopadi Natun Bazer under Nowapara Paurashava at Ch 0+000-1+550 =1550m (Ward No-03), Parashava: Nowapara , District: Jashore
|
|
3.55
|
0.00
|
0.00
|
151.70
|
SI & SC JV
|
129.47
|
08/06/2020
|
15/06/2020
|
08/06/2021
|
70
|
87.44
|
68
|
18/11/2024
|
|
285
|
Joypurhat
|
50
|
panchbibi
|
362
|
824
|
UIIP-BC/PCO/W-508
|
Rehabilitation on of RCC Road & RCC drain St from Joypurhat-Panchbibi Road to H/O Chandon Ward No: 02 Ch.0+94.00m.
|
|
0.09
|
0.00
|
0.00
|
17.60
|
Kalicharan Agarwala
|
18.64
|
31/05/2022
|
07/06/2022
|
30/05/2022
|
40
|
0.00
|
0
|
29/09/2022
|
|
286
|
Joypurhat
|
50
|
panchbibi
|
362
|
824
|
UIIP-BC/PCO/W-446
|
1. Construction of RCC Drain St. From Baitul Noor Boro Mosijid Moor to Balighata Bazar Tinmatha Moor (South Road Side) at Panchbibi Pourashava Ward No-03 (Ch0+000-0+115.00m)
2. Improvement of BC Road Starting from Pollibidut more to upzila Mosque Moor Length- 0+000-0+200.00m, Ward No-0) 3. Rehabilitation of BC Road Starting from upzila Mosque Moore to Jonoshatho Length- 0+000-0+550.00m) Ward No-05.
|
|
0.55
|
0.00
|
0.00
|
61.38
|
Kalicharan Agarwala
|
64.43
|
14/06/2022
|
21/06/2022
|
20/06/2023
|
0
|
0.00
|
0
|
29/09/2022
|
|
287
|
Joypurhat
|
50
|
panchbibi
|
362
|
824
|
UIIP-BC/PCO/W-445
|
1. Construction of RCC Drain & RCC Road St. from Maloncha Charmatha More Culvert to House of Rashid Mosque (East side) at Panchbibi Pourashava (Drain Ch.0+000-0+80m, Road Ch.0+00-0+60m) Ward No-04 2. Construction of RCC Road St. from Kazi Office More to Kalai Hati Road at Panchbibi Pourashava, Joypurhat Length-0+000-200.00m, Ward No-08 3. Construction of RCC Drain & RCC Road St. from Textile Mill More to House of Nuhur at Panchbibi Pourashava, Joypurhat Length-0+000-90.00m, Ward No-02
|
|
0.06
|
0.00
|
0.00
|
64.61
|
Kalicharan Agarwala
|
67.84
|
14/06/2022
|
21/06/2022
|
20/06/2023
|
0
|
0.00
|
0
|
29/09/2022
|
|
288
|
Joypurhat
|
50
|
panchbibi
|
362
|
824
|
UIIP-BC/PCO/W-444
|
1. Construction of RCC Drain St. from Kamdia Road MP House Old Mosque to East Balighata (West Side) at Panchbibi Pourashava (Ch.0+000-0+400.00m) Ward No-01
|
|
|
0.00
|
0.00
|
68.70
|
Kalicharan Agarwala
|
72.06
|
14/06/2022
|
21/06/2022
|
20/06/2023
|
0
|
0.00
|
0
|
29/09/2022
|
|
289
|
Joypurhat
|
50
|
panchbibi
|
362
|
824
|
UIIP-BC/PCO/W-361
|
Improvement of BC Road St from Danejpur H/O Ab.Khallek to Via H/O Obaidul to H/O Shafiulla Mia at Panchbibi Pourashava Length- 0+000-380.00m (2) Improvement of BC Road St form Korroti Ram Krishno Mondir to Rail Line Via Ossman Para at Panchbibi Pourashava Joypurhat Length-0+000-850.00m
|
|
1.04
|
0.00
|
0.00
|
94.67
|
M/S Progoti Nirman
|
103.67
|
19/12/2021
|
19/12/2021
|
19/12/2022
|
65
|
64.03
|
62
|
29/09/2022
|
|
290
|
Joypurhat
|
50
|
panchbibi
|
362
|
824
|
UIIP-BC/PCO/W-360
|
Improvement of BC Road Starting From H/O Kohorulla Master to Ramtanu School (Rail) Gate) Via H/O Ex Copunsilor Mojurul at Panchbibi Pourashava
|
|
0.68
|
0.00
|
0.00
|
70.29
|
M/S Progoti Nirman
|
76.90
|
19/12/2021
|
19/12/2021
|
19/12/2022
|
35
|
0.00
|
0
|
29/09/2022
|
|
291
|
Joypurhat
|
50
|
panchbibi
|
362
|
824
|
UIIP-BC/PCO/W-359
|
(1) Improvement of BC Road Starting From Mahatas Monjil Mosjid to Mukto Khalaghor Via H/O Monower Chowdhury Pond at Panchbabi Pourashava, Joyporhat Length-0+000-360.00m
(2) Improvement of BC Road St from Hilli Road to H/O Shirajul at Panchbibi Pourashava, Joypurhat Length- 0+000-290.00m
(3) Improvement of BC Road St from Borgahati Road to 1.ono Raill Gate Via Griho Nirman office at Panchbibi Pourashava, Joypurhat, Length-0+000-350.00m
(4) Improvement of BC Road Starting From H/O Elias Moulana to Gopalpur at Panchbibi Pourashava, Joypurhat, Length- 0+000-260.00m
|
|
1.06
|
0.00
|
0.00
|
76.11
|
M/S Progoti Nirman
|
83.33
|
19/12/2021
|
19/12/2021
|
19/12/2022
|
60
|
36.83
|
44
|
29/09/2022
|
|
292
|
Joypurhat
|
50
|
panchbibi
|
362
|
824
|
UIIP-BC/PCO/W-358
|
Construction of RCC Drain and RCC Road St From Society Market Gate Balighata Bazar Front Side of Panchbibi Pourashava Kitchen & Municipal Market to Panchbibi Bus Stand at Panchbibi Pourashava (Drain Ch. 0.0-295.00m Road Ch. 0.0-512.00m
|
|
0.54
|
0.00
|
0.00
|
152.85
|
Kalicharan Agarwala
|
167.34
|
19/12/2021
|
19/12/2021
|
19/12/2021
|
100
|
167.30
|
100
|
29/09/2022
|
|
293
|
Joypurhat
|
50
|
panchbibi
|
362
|
824
|
UIIP-BC/PCO/W-066
|
1. Construction of RCC Drain St. From Mukto Khelaghor at Damdama Panchbibi Pourashava.Word no.05 (Ch. 0+000-0+255.00m).2. Construction of RCC Drain St. From Balighata Bazar Tinmatha Moor to Janata Bank Moor South Road Side at Panchbibi Pourashava.Word no.03 (Ch. 0+000-0+185.00m).
|
|
|
0.00
|
0.00
|
99.52
|
M/S Raihan Construction
|
99.52
|
23/03/2021
|
03/12/2020
|
12/04/2021
|
100
|
99.52
|
100
|
29/09/2022
|
|
294
|
Joypurhat
|
50
|
panchbibi
|
362
|
824
|
UIIP-BC/PCO/W-065
|
Construction of Rcc Drain starting from 1 no. railgate to Danejpur Kamrul chaw mill at Panchbibi Pourashava, Ward no-09, length- ch.-0+000-0+550.00m, under Panchbibi Pourashava, District: Joypurhat.
|
|
|
0.00
|
0.00
|
99.31
|
Kalicharan Agarwala
|
99.15
|
08/08/2020
|
15/08/2020
|
14/08/2021
|
100
|
99.15
|
100
|
29/09/2022
|
|
295
|
Joypurhat
|
50
|
panchbibi
|
362
|
824
|
UIIP- BC/PCO/W-064
|
1. Improvement of Road Starting from Joypurhat - Hili Road to H/o Radhanath at Damdama, Panchbibi Pourashava. Length- 0+000-0+250.00m, Ward No.-05
2. Improvement of BC Road Starting from Mohipur College Road to H/o Kalam Sharkar at Panchbibi, Panchbibi Pourashava. Length- 0+000-0+180.00m, Ward No.-08
3. Improvement of BC Road Starting from Gopalpur Road to Danajpur Adibashipara at Danajpur, Panchbibi Pourashava. Length- 0+000-0+270.00m, Ward No.-09
4. Construction of RCC Drain St. From Pond of Kenedi Mondol to Radhabari Mosque at Radhabari,Panchbibi Pourashava.Word no.06 (Ch. 0+000-0+210.00).
|
|
0.76
|
0.00
|
0.00
|
98.13
|
M/S Progoti Nirman
|
98.13
|
23/03/2021
|
|
26/09/2021
|
100
|
96.10
|
98
|
29/09/2022
|
|
296
|
Joypurhat
|
50
|
panchbibi
|
362
|
824
|
UIIP- BC/PCO/W-063
|
1.(a) Improvement of BC Road Starting from UNO Office to H/O Maruf at Damdama, Panchbibi Pourashava. Length- 0+000-0+200.00m, Ward No.-05.
2. Rehabilation of BC Road St. from Hili Road H/o Vim , to Mukto Khelaghor, Length- 0+000-0+600.00m, Ward No.- 05.
3. Improvement of BC Road St. from Panchbibi Koria Road Via Raihan Vai Plot to Hotatpara at Maloncha, Panchbibi Pourashava Length- 0+000-0+500.m, Ward No.- 04.
4. Rehabilation of BC Road St. from Kmdia Road to Danajpur Khanka Shrif, Length- 0+000-0+230.0m, Ward No.- 09.
5. Rehabilation of BC Road St. from Hariharpur Lat Aziz Chowdhury Para, Length- 0+000-0+220.00m, Ward No.- 01.
|
|
1.69
|
0.00
|
0.00
|
98.69
|
M/S Raihan Construction
|
98.69
|
23/03/2021
|
|
26/09/2021
|
100
|
93.94
|
95
|
29/09/2022
|
|
297
|
Kurigram
|
56
|
nageswari
|
430
|
824
|
UIIP-BC/PCO/W-443
|
(1) Construction of RCC road Gach hati at Nageswari Bazar Under Negeswari Pourashava W-04 ( RCC road L=125.00m).(2) Construction of RCC road from Abu Bokkor Hazi Mosque to Mr. Saiyad Ali house at Momin Gonj Under Negeswari Pourashava W-08 ( RCC road L=50.00m).
|
|
0.18
|
0.00
|
0.00
|
28.60
|
M/S Aroshi Construction
|
27.59
|
15/02/2022
|
16/02/2022
|
16/02/2023
|
95
|
21.78
|
79
|
29/09/2022
|
|
298
|
Kurigram
|
56
|
nageswari
|
430
|
824
|
UIIP-BC/PCO/W-442
|
(1) Construction of RCC Road Mukul Sub-Register house up to South via Manik house to Khairul Mia Pond Under Nageswari Pourashava. W-04 (Rcc road L=330.00m )
(2)Construction of RCC Road Tazul house up to east Koligong gami road Under Nageswari Pourashava. W-04 (Rcc road L=432.00m )
(3) Construction of RCC Road Balika Ucch Biddaloy to Fozlu house at Monir Char Under Nageswari Pourashava. W-04 (Rcc road L=120.00m )
|
|
0.88
|
0.00
|
0.00
|
84.31
|
M/S Aroshi Construction
|
84.31
|
15/02/2022
|
16/02/2022
|
16/02/2023
|
100
|
55.20
|
66
|
29/09/2022
|
|
299
|
Kurigram
|
56
|
nageswari
|
430
|
824
|
UIIP-BC/PCO/W-441
|
(1) Maintenance of Carpeting road from Horirpat to Hashem Bazar more at Hashem Bazar Under Negeswari Pourashava W-08 L=2350.00m).
(2) Maintenance of Carpeting road from Badsha Chairman house to Mohashin Kerani house at Sanzuavita Under Negeswari Pourashava W-04 L=720.00m .
|
|
3.02
|
0.00
|
0.00
|
63.24
|
M/S Hamid Traders
|
56.38
|
15/02/2022
|
16/02/2022
|
16/02/2023
|
45
|
22.17
|
40
|
29/09/2022
|
|
300
|
Kurigram
|
56
|
nageswari
|
430
|
824
|
UIIP-BC/PCO/W-440
|
(1) Construction of RCC Drain from Shahin house to Rawson house at kachari bazar, Under Nageswari Pourashava. W-08 (RCC drain L=135.00m )
(2) Construction of RCC Drain from Mongol house to Murgi hati at Nageswari Bazar, Under Nageswari Pourashava. W-04 (Rcc drain L=50.00m+90.00m)=140.00m
|
|
|
0.00
|
0.00
|
32.60
|
Md. Khairul Kabir Rana
|
35.58
|
13/03/2022
|
20/03/2022
|
12/03/2023
|
25
|
6.00
|
17
|
29/09/2022
|
|
301
|
Kurigram
|
56
|
nageswari
|
430
|
824
|
UIIP-BC/PCO/W-439
|
(1) Construction of RCC Drain from Horirpat road (Box-Culvert) to Monzu house East side of Geash house Under Nageswari Pourashava. W-08 (Rcc drain L=50.00m )(2) Construction of RCC Drain from Bimol master house to Robi Ram house at Gurguri Under Nageswari Pourashava. W-08 (Rcc drain L=33.00m )
|
|
|
0.00
|
0.00
|
14.57
|
M/S Aroshi Construction
|
13.31
|
15/02/2022
|
16/02/2022
|
16/02/2023
|
85
|
8.01
|
60
|
29/09/2022
|
|
302
|
Kurigram
|
56
|
nageswari
|
430
|
824
|
UIIP-BC/PCO/W-438
|
(1) Construction of RCC Drain from Vusurtary Abdul khalek house to Enayetpuri khanka at Vusurtary under Nageswari Pourashava. W-04 (Rcc drain L=355.00m)
(2) Construction of RCC Drain from Vusultary Ali house to Girai under Nageswari Pourashava. W-04 (Ch0.0-70.00m)
(3) Construction of RCC Drain Gach hati Both side at Nageswari Bazar Under Nageswari Pourashava. W-04 (Rcc drain L=125.00mx2=250.00m )
|
|
|
0.00
|
0.00
|
90.00
|
M/S Aroshi Construction
|
82.03
|
15/02/2022
|
16/02/2022
|
16/02/2023
|
65
|
47.46
|
58
|
29/09/2022
|
|
303
|
Kurigram
|
56
|
nageswari
|
430
|
824
|
UIIP-BC/PCO/W-437
|
(1) Construction of RCC Drain from Bolditari more Anis Master house up to South Mosque Under Nageswari Pourashava. W-06 (Rcc drain L=90.00m )
(2) Construction of RCC Drain from Bolditari more to Chamtarpar Box-culvert (near Vola house) Under Nageswari Pourashava. W-06 (Rcc drain L=505.00m )
|
|
|
0.00
|
0.00
|
74.37
|
M/S Aroshi Construction
|
68.54
|
15/02/2022
|
16/02/2022
|
16/02/2023
|
100
|
54.69
|
80
|
29/09/2022
|
|
304
|
Kurigram
|
56
|
nageswari
|
430
|
824
|
UIIP-BC/PCO/W-436
|
(1) Construction of Box Culvert (Size 2x1.5) at Monirchar near of Tazul house Under Negeswari Pourashava w-04
(2) Construction of Box Culvert (Size 1.5x1) at Solor khamar Dr. Mizanur house near Under Negeswari Pourashava W-02
(3) Construction of Box Culvert (Size 1.5x1) at Machur khamar Mozibor house near Under Negeswari Pourashava w-02
(4) Construction of Box Culvert (Size 1.5x1) at Boxi khamar Ayonarl house near Under Negeswari Pourashava W-02
(5)Construction of Box Culvert (Size 1.5x1) near Mannan house at Akalur vita Under Negeswari Pourashava w-01
(6)Construction of Box Culvert (Size 1.5x1) near of Samad house at Sarkar tari Under Negeswari Pourashavaw-01
(7) Construction of Box Culvert (Size 1.5x1) near of Mozibor Rahman house at Sarkartary Under Negeswari Pourashava w-01
|
|
|
11.00
|
0.00
|
39.73
|
M/S Alif Enterprise
|
37.97
|
15/02/2022
|
16/02/2022
|
16/02/2023
|
30
|
0.00
|
0
|
29/09/2022
|
|
305
|
Kurigram
|
56
|
nageswari
|
430
|
824
|
UIIP-BC/PCO/W-435
|
(1) Construction of Box Culvert (Size 2x2) at Gurgure par Momingong Under Negeswari Pourashava w-08
(2) Construction of Box Culvert (Size 2x1.5) at Ali dighi Malvanga Under Negeswari Pourashava w-02
(3) Construction of Box Culvert (Size 2x2) east sie of Dr. Sumad house at Modhurhallia Under Negeswari Pourashava w-03
(4) Construction of Box Culvert (Size 1.5x1) near h/o sama sing at South side of Gurguri Momingong Under Negeswari Pourashava w-08
(5) Construction of Box Culvert (Size 2x1.5) at Mulatikari Under Negeswari Pourashava w-02
(6) Construction of Box Culvert (Size 2x1.5) near Shop of Alimuddin at Hurka tari Under Negeswari Pourashava w-05
|
|
|
9.50
|
0.00
|
46.67
|
M/S Alif Enterprise
|
44.16
|
15/02/2022
|
16/02/2022
|
16/02/2023
|
70
|
0.00
|
0
|
29/09/2022
|
|
306
|
Kurigram
|
56
|
nageswari
|
430
|
824
|
UIIP-BC/PCO/W-184
|
(1) Improvement of Carpeting Road from sukhati Gonesh house to Horey Krisna house under Nageswari Pourosava w-06 L 100.00m
(2) Improvement of carpeting Road Upazila campus under Nageswari pourosava w-05 L 270.00m
(3) Maintenance Weding of carpeting road Construction of RCC Drain and RCC Road from Adorsho para Sishu bitan School road & new Protisruti School Road under nageswai pourosava W-05 BC road 136.00m RCC Road L Ch. 0.0-110m & Rccdrain L 260.00m
(4) Improvement of carpeting road from Hirakhamar Bahar Master house towards north upto Mojafor house under Nageswari Pourosava w-02 L 150.00m
(5) Maintanance of Carpeting Road & Construction of RCC Road from Hirakamar Ataur house to malvanga mosque under Nageswari pourosava w-02 LBC160.00m RCC 160.00m. Total L 320.00m
(6) Improvement of Carpeting Road from hiirakamar main road to Mosque under Nageswari pourosova w-03 L 40.00m
|
|
0.99
|
0.00
|
0.00
|
109.22
|
M/S Arshi Construction
|
109.04
|
06/12/2020
|
|
12/12/2021
|
100
|
109.04
|
100
|
29/09/2022
|
|
307
|
Kurigram
|
56
|
nageswari
|
430
|
824
|
UIIP-BC/PCO/W-183
|
(1) Improvement of Carpeting road from K.B road to Poura Bhavan Under Negeswari Pourahava w-06 L 47.00m
(2) Constrction of Boz Culvert Size 2*1.5 at Moduhaillah gami road west side ot Goni molla dhoni molla gami road Under Negeswari Pourashava w-03 Box Culvert 01 nos
(3) Improvement of Carpeting road form K.B road near kachari Poiradanga towards west upto Bridge of Kanddura hat Under Negeswari Pourashava w-07 L 405.00m
(4) Maintenance of Carpeting road & Construciton of RCC road from K.B road to Thana gate Under Negeswari Pourashava w-02 L 217.00m & x-drain 01 nos
(5) Improvement of Carpeting road form Buddermore towards north upto Kashem hazi house Under Negeswari Pourashava w-06 L 390.00m & x-drain 01 nos
(6) Construction of RCC road from Satanipara Obbot shop to Fulbari gami road under Negeswari Pourashava W-05 Ch0.00-330.00m.
|
|
0.74
|
2.00
|
0.00
|
120.30
|
Sun Flower Constuction Ltd.
|
119.49
|
11/03/2020
|
11/03/2020
|
11/02/2021
|
100
|
119.49
|
100
|
29/09/2022
|
|
308
|
Kurigram
|
56
|
nageswari
|
430
|
824
|
UIIP-BC/PCO/W-182
|
(1) Construction of Box Culvert size 2x1.5 at Malvanga vai vai more to Usman hazi house under Nagesshwari Pourosava w-02 Box Culvert 01 nos.(2) Improvement of Carpeting Road from Moduhailla game lged road to Goni Molla Dhoni Molla gami road under Nageswari pourosava w- 04 L 302.00m(3) Maintanance and Improvement of carpeting Road from Malvanga vai vai more toUsman haji house under Nageswari pourosava w-02 L 590.00m & Box Culvert 01 nos.
|
|
0.89
|
1.00
|
0.00
|
73.98
|
M/S Zahurul Haque Dulal
|
73.95
|
17/12/2020
|
|
16/12/2021
|
100
|
72.78
|
99
|
29/09/2022
|
|
309
|
Kurigram
|
56
|
nageswari
|
430
|
824
|
UIIP-BC/PCO/W-117
|
(1) Construction of RCC Drain Road form Markaz Mosque South Side Mannan Khan house ot Rezaul house at Monirchor under Nageswari Porashava W-04 Ch0.00138.20m
(2) Improvement of Carpeting road from Musulli para to digirpar Under Negeswari Pourashava W-09 L542.00m & x-drain 03 nos
(3) Construction of Boz Culvert Size 2*1.5 at Musulli para to digirpar Under Negeswari Pourashava W-09 Box- culvert 01 nos
(4) Improvement of Carpeting road form Saifur Dala house to arazikumorpur new eidgah filed Under Negeswari Pourashava w-09 L920.00m & x-drain 03 nos
(5) Construction of Boz Culvert Size 2*1.5 at Saifur Dalal house to arazikumorpur new eidgah filed under negeswari Pourashava w-09 Box- culvert 01 nos
|
|
1.46
|
5.00
|
0.00
|
252.35
|
M/S Arshi Construction
|
131.95
|
18/08/2021
|
|
17/08/2022
|
100
|
130.39
|
99
|
29/09/2022
|
|
310
|
Kurigram
|
56
|
nageswari
|
430
|
824
|
UIIP-BC/PCO/W-17
|
(1) Construction of RCC Road from Chamterpar Roshid house to Altaf Polish house undernageswari Pourashava W-06 Ch0.0-59.00m
(2) Construction of RCC Road from Dayanar par faruk shop to Akramul master house under Nageswari Pourashava W-09 Ch0.00-110.00m
(3) Construction of RCC Drain Chataing Abdul Hai house to Lal miya low land under Nageswari Pourashava W-08 L20.00m 20.00m 40.00m only slab 20.00m
(4) Construciton of RCC Drain Chemperpar Shohidul house to Fozor Ali via Anower Master house to Altaf house under Nageswari Pourashava W-06 RCC drain L 215.00m
(5) Construction of RCC Drain & RCC Road from College more fulbari gami towards south Gopal house under Nageswari Pourashva W-05 RCC road L Ch0.00-125.00m & RCC drain L 16.00m
(6) Construciton of RCC from Kazi para Azim Master house to Alam Chatal under Nageswari Pourashava W-04 Ch0.0-165.00m
|
|
0.46
|
0.00
|
0.00
|
22.59
|
MD Khaiurl Kabir Rana
|
73.26
|
18/08/2021
|
|
17/08/2022
|
100
|
73.24
|
100
|
29/09/2022
|
|
311
|
Kurigram
|
56
|
nageswari
|
430
|
824
|
UIIP-BC/PCO/W-16
|
(1) Construction of RCC Road from Faksa more towards south upto salam house under Nageswari Pourashava W-06 Ch0.00-58.00m
(2) Construction of RCC Road from newashi gami road chamterpar Mozedul house to Hamidul house under Nageswari Pourashava . W-06 Ch0.00-180.00m
(3) Rehabiltation of Carpeting road from Budder more towards South up to Mr. Mofiz deyani house/Pakhir more road Under Negeswari pourashava w-06 Link road 200.00m total 1445.00m & x-drain-03 nos
|
|
1.68
|
0.00
|
0.00
|
0.03
|
M/S Zahurul Haque Dulal
|
95.94
|
18/08/2021
|
25/08/2020
|
17/08/2022
|
100
|
95.94
|
100
|
29/09/2022
|
|
312
|
Lalmonirhat
|
54
|
patgram
|
389
|
824
|
UIIP-BC/PCO/W-176
|
A Construction of DC Road Afiuddin Shop to Ruhul Amin house. Word No-07. Ch.0.00-510.00m. Under Patgram Pourashava Dist. Lalmonirhat.
B Rehabilitation of BC Road From Rubber Dum Moslimpara Mosque to Ayliarhat Ayliarhat BC Road via Ajo Kabiraz house. Word No-01. Ch.0.00-1290.00m. Under Patgram Pourashava Dist. Lalmonirhat
. C Construction of BC Road From Kasem Masters Chatal to Gomir Member graveyard Word No-03. Ch.0.00-140.00m. Under Patgram Pourashava Dist. Lalmonirhat.
|
|
1.94
|
0.00
|
0.00
|
171.77
|
Md. Golam Rabbani
|
131.11
|
10/04/2020
|
10/11/2020
|
10/10/2021
|
100
|
93.40
|
71
|
29/09/2022
|
|
313
|
Lalmonirhat
|
54
|
patgram
|
389
|
824
|
UIIP-BC/PCO/W-175
|
A Construction of DC Road From Soreo Bazar RHD Road to Faruks house. Word No-09. Ch.0.00-635.00m. Under Patgram Pourashava Dist. Lalmonirhat.
B Construction of RCC Drain from Abuls House to Patgram Rest House Word No-05. Ch.0.00-170.00m. Under Patgram Pourashava. Dist. Lalmonirhat.
C Construction of RCC Drain from Upozila more to Juel Shop. Word No-05. Ch.0.00-165.00m. Under Patgram Pourashava. Dist. Lalmonirhat.
D Construction of RCC Drain from Gov. Primary School to Anamuls House Via Press Club. Word No-06. Ch.0.00-255.00m. Under Patgram Pourashava. Dist. Lalmonirhat.
|
|
0.64
|
0.00
|
0.00
|
152.65
|
Md. Golam Rabbani
|
115.01
|
12/08/2020
|
|
14/12/2021
|
100
|
27.96
|
25
|
29/09/2022
|
|
314
|
Lalmonirhat
|
54
|
patgram
|
389
|
824
|
UIIP-BC/PCO/W-78
|
a. Construction of RCC Drain from Bulu Member house to East site Darla River Word No-08. Ch.0.00-200.00m. Under Patgram Pourashava. Dist. Lalmonirhat. b. Construction of RCC Drain from Mahabuls house to Fozlu house. Word No-06. Ch.0.00-70.00m. Under Patgram Pourashava. Dist. Lalmonirhat.
|
|
|
0.00
|
0.00
|
123.12
|
Md. Golam Rabbani
|
97.79
|
17/11/2020
|
|
23/11/2021
|
0
|
0.00
|
0
|
29/09/2022
|
|
315
|
Lalmonirhat
|
54
|
patgram
|
389
|
824
|
UIIP-BC/PCO/W-77
|
a. Construction of BC Road From Mofijul Couchilor house to Subot shah Godawn. Word No-09. Ch.0.00-500.00m. Under Patgram Pourashava Dist. Lalmonirhat.
b. Construction of RCC Road from Rafikuls house to Jhakuatari Mosque. Ch.150.00-350.00m Word No-04. Patgram Pourashava Dist. Lalmonirhat.
c. Construction of RCC Drain from Saheb dhanga More to Post office. Word No-06. Ch.0.00-295.00m. Under Patgram Pourashava. Dist. Lalmonirhat.
d. Construction of RCC Drain from Jobbar house to Jobbar Abasic Hotel. Word No-04. Ch.0.00-210.00m. Under Patgram Pourashava. Dist. Lalmonirhat.
|
|
0.85
|
0.00
|
0.00
|
117.45
|
OE & SH(JV), M/S. Anto Enterprise, Dist.-Lalmonirhat.
|
92.16
|
24/08/2020
|
|
30/08/2021
|
100
|
75.00
|
82
|
29/09/2022
|
|
316
|
Lalmonirhat
|
54
|
patgram
|
389
|
824
|
UIIP-BC/PCO/W-76
|
a. Construction of BC Road From Achir Khan Shop to Sekor Uddin house. Word No-03. Ch.200.00-750.00m. Under Patgram Pourashava Dist. Lalmonirhat.
b Construction of DC Road From Mirjarcot Rahimuddin Mazar graveyard to habibur Rahman house Word No-09. Ch.0.00-330m. Under Patgram Pourashava Dist. Lalmonirhat
c Construction of RCC Drain from Punna Sirr House to Susil House Word No-03. Ch.0.00-100.00m. Under Patgram Pourashava. Dist. Lalmonirhat.
.d Rehabilitation of BC Road From joynals house to Afaz mia house. Word No-03. Ch.0.00-400.00m. Under Patgram Pourashava Dist. Lalmonirhat.
.
|
|
1.48
|
0.00
|
0.00
|
96.89
|
OE & SH(JV), M/S. Anto Enterprise, Dist.-Lalmonirhat.
|
75.63
|
24/08/2020
|
|
30/08/2021
|
100
|
58.90
|
78
|
29/09/2022
|
|
317
|
Madaripur
|
30
|
rajoir
|
228
|
824
|
UIIP/PCO/G-58
|
Implementation & Supply 602 nos Waste Basket (120 ltr) & 20 nos Non-motorized vehicle (van) under Rajoir Pourashava District: Madaripur.
|
|
|
|
1.00
|
39.98
|
RFL Plastics LTD
|
30.15
|
|
|
|
0
|
0.00
|
0
|
04/11/2024
|
|
318
|
Madaripur
|
30
|
rajoir
|
228
|
824
|
UIIP-BC/PCO/W-607
|
Contruction of RCC Road From Rajoir Bus Stand to Rajoir-Bazar RCC Via Upazila Parishad in Ward No. -07 Under Rajoir Pourashava. Madaripur (Ch:0.00-710)m
|
|
0.71
|
|
|
175.72
|
M/s. Farjana Khan
|
165.00
|
26/07/2023
|
02/08/2023
|
25/08/2024
|
100
|
164.02
|
100
|
04/11/2024
|
|
319
|
Madaripur
|
30
|
rajoir
|
228
|
824
|
UIIP-BC/PCO/W-519
|
A) Construction of Shed for Public Transport Passenger (28.00 sqm) at Rajoir Bazar Ward No.-07 Under Rajoir Pourashava District: Madaripur.
B) Construction of One Storied Public Toilet (Type A=56 sqm) ৃat Shaner Par Ward No.-07 Under Rajoir Pourashava District: Madaripur.
C) Construction of One storied vegetables & agricultural products market of 5 storied foundation (Floor area=314 sqm) at Tekerhat Bazar, Ward No.-03 under Rajoir Pourashava,Madaripur.
|
|
|
|
3.00
|
193.15
|
Syed Ziaul Hoque
|
171.37
|
26/07/2023
|
02/08/2023
|
25/07/2024
|
42
|
50.00
|
29
|
04/11/2024
|
|
320
|
Madaripur
|
30
|
rajoir
|
228
|
824
|
UIIP-BC/PCO/W-466
|
(A)Improvement workat Sundukuri Chayna Member house road to west Rajoir Boro Bridge via Baitussalam Mosque by Carpeting Road under Rajoir Pourashava, District : Madaripur(L=728.00m)(Salvage Materials Cost Tk. 503145.00)
(B) Cimprovement work at Jonab Ali road to Nurmohammed house via Yunus Member House by RCC road under Rajoir Popurashava, District: Madaripur(Ch:0.00-656.0m) (Salvage materials cost Tk. 943122.00)
©Improvement work at Macharong RCC road to Jon ab Ali road by RCCroad Under Rajoir Pourashava, District: Madaripur (Ch: 0.00-702.0m)
|
|
2.09
|
|
|
216.21
|
M/sRimi Nerman Sangstha
|
179.13
|
17/04/2022
|
24/04/2022
|
30/08/2024
|
94
|
155.78
|
87
|
04/11/2024
|
|
321
|
Madaripur
|
30
|
rajoir
|
228
|
824
|
UIIP-BC/PCO/W-429
|
(A) Construction of road from Takerhat Bazar to Milk Vita Dairy Plant.(Ch.0+(-30)-0+768=798m) (B) Construction Drain of Road from Takerhat Bazar to Milk Vita Dairy Plant (Ch:0+240 to 0+440=200.00m) (C) Construction of Guide wall along drain outfall of Road from Takerhat Bazar to Milk Vita Dairy Plant
|
|
0.80
|
0.00
|
0.00
|
226.48
|
M/s Mizan Enterprise
|
183.99
|
06/02/2022
|
|
05/02/2023
|
84
|
103.09
|
56
|
04/11/2024
|
|
322
|
Madaripur
|
30
|
rajoir
|
228
|
824
|
UIIP-BC/PCO/W-255
|
Improvement work at Amgram BC road to Shilbari by RCC road (L=162.00m). Improvement work at Mojumderkandi Eshakia Madrasha to Koda Molla house by RCC road (L=507.00m). Construction of RCC Drain at West Rajoir Choukider house road to Kumar River via Gorerhat (L=240.00m) under Rajoir Pourashava District Madaripur.
|
|
0.67
|
0.00
|
0.00
|
114.60
|
M/s Mizan Enterprise
|
91.00
|
11/02/2021
|
|
10/02/2022
|
61
|
48.78
|
54
|
04/11/2024
|
|
323
|
Madaripur
|
30
|
rajoir
|
228
|
824
|
UIIP-BC/PCO/W-242
|
Improvement work at Sundikuri Chayna Member house road to Lalmia Shop house by Carpeting road (L=625.00m). Improvement work at Norakandi Boro Mosque road to Molla bari by RCC road (L=300.00m). Improvement work at Norakandi BC road to Shamsu kha house via Dr. Mizan House by RCC road (L=170.00m) under Rajoir Pourashava District Madaripur.
|
|
0.63
|
0.00
|
0.00
|
115.53
|
M/s Mizan Enterprise
|
91.00
|
11/02/2021
|
|
10/02/2022
|
100
|
86.09
|
86
|
04/11/2024
|
|
324
|
Madaripur
|
30
|
rajoir
|
228
|
824
|
UIIP-BC/PCO/W-241
|
Improvement work at Ambag Mosque to Chunni house & Billal Shop to Emran House by RCC road (L=200.00m). Improvement work at Mojumderkandi BC road to Islam member house by Carpeting road (L=497.00m)Rehabilitaion work at Mojumderkandi Kotalipara road to Sanerpara BC road by Bituminous Carpeting(L=570.00m)
|
|
0.20
|
0.00
|
0.00
|
89.46
|
Rafiq Construction Co. (Pvt.) Ltd.
|
71.46
|
27/06/2021
|
04/07/2021
|
26/06/2022
|
100
|
69.51
|
100
|
04/11/2024
|
|
325
|
Madaripur
|
30
|
rajoir
|
228
|
824
|
UIIP-BC/PCO/W-103
|
Improvement Work at Bhagha bari BC road to Bagha bari Jame Mosque by RCC road (L=435.00m).Improvement & widening Work at Tekerhat Durgamondir Road starting from EXIM Bank to Jonab Ali road by RCC road (L=312.00m). Improvement work at Ridoynondi School road by RCC work (L=182.00m).
|
|
0.44
|
0.00
|
0.00
|
123.40
|
MPE-MTE (JVCA)
|
100.39
|
12/08/2020
|
19/08/2020
|
18/08/2021
|
100
|
97.21
|
100
|
04/11/2024
|
|
326
|
Madaripur
|
30
|
rajoir
|
228
|
824
|
UIIP-BC/PCO/W-102
|
Construction of RCC Drain at Beparipara Shahpara road under Rajoir Pouroshava (L=152.00m).
Improvement Work at Shundikuri Sona Mia house Road to Profullo Bala House by RCC road (L=350.00m).Improvement Work at Shahapara box culvert to Beparipara Jame Mosque by RCC road (L=152.00m).
|
|
0.50
|
0.00
|
0.00
|
81.63
|
M/S Toma Enterprise
|
61.82
|
12/08/2020
|
|
18/08/2021
|
100
|
61.74
|
100
|
29/09/2022
|
|
327
|
Madaripur
|
30
|
rajoir
|
228
|
824
|
UIIP-BC/PCO/W-101
|
Improvement Work at Rajoir Girls School to Rajoir Thanar more via Rajoir Bazzar by RCC road (Ch.684.00-1549.00m=865.00m).
|
|
0.87
|
0.00
|
0.00
|
177.20
|
M/S Farjana Khan
|
154.62
|
12/08/2020
|
19/08/2020
|
18/08/2021
|
100
|
154.56
|
100
|
29/09/2022
|
|
328
|
Moulvibazar
|
62
|
sreemangal
|
474
|
824
|
UIIP-BC/PCO/W-484
|
a) Construction of Vegetables Agriculter Products Markets (Sager Digipar)
b) Constrcution of Public Toilet (Bhanugassroad)
c) Construction of Shed for Public Transport Passenger (Bhanugassroad)
|
|
|
0.00
|
3.00
|
183.02
|
Abu Bakar Ahmed & Sons
|
182.79
|
13/04/2022
|
20/04/2022
|
19/04/2022
|
30
|
0.00
|
0
|
29/09/2022
|
|
329
|
Moulvibazar
|
62
|
sreemangal
|
474
|
824
|
UIIP-BC/PCO/W-337
|
Construction of drain at vanugash road via infornt of zilla porishad rest house staring from station road to rail corssing ch.00.0m to 507.00m
|
|
|
0.00
|
0.00
|
183.22
|
M/S Abu bakkar ahmed sons
|
182.45
|
02/05/2021
|
09/06/2021
|
06/05/2022
|
100
|
182.33
|
100
|
29/09/2022
|
|
330
|
Moulvibazar
|
62
|
sreemangal
|
474
|
824
|
UIIP-BC/PCO/W-336
|
a)Improvement of post office road by bituminious carpeting under sreemangal pourashava ch.0.00m to 210.30m
b) Improvement of Shaplabag road by bituminous carpeting under sreemangal pourashava ch.0.00 m to 225.00m.
c) Construction of Ukil bari approch road near Sher ali house south side. Ch.0.00m+310.46m.
c) Improvement of central road by bituminus carpeting under sreemangal pourashava ch.0.00m to 199.70m
|
|
0.95
|
0.00
|
0.00
|
83.37
|
M/S Suma Enterprise
|
83.35
|
09/06/2021
|
10/06/2021
|
09/06/2022
|
100
|
43.70
|
52
|
29/09/2022
|
|
331
|
Moulvibazar
|
62
|
sreemangal
|
474
|
824
|
UIIP-BC/PCO/W-335
|
Construction of drain at Abdul kayum road to rail corssing under Sreemangal Pourashava ch.00m to 217.00m
|
|
|
0.00
|
0.00
|
44.58
|
M/S Suma Enterprise
|
44.57
|
13/06/2021
|
20/06/2021
|
19/06/2022
|
100
|
30.14
|
68
|
29/09/2022
|
|
332
|
Moulvibazar
|
62
|
sreemangal
|
474
|
824
|
UIIP-BC/PCO/W-334
|
a) Construction of RCC drain puranbazar road to shaplabag road ch.00-51.21m b) Construction of drain at Ukilbari approach road near Sher ali house south side ch.00-310.46m
|
|
|
0.00
|
0.00
|
49.20
|
M/S Chowdhury Enterprise
|
49.00
|
12/05/2021
|
19/05/2021
|
19/05/2022
|
100
|
32.92
|
67
|
29/09/2022
|
|
333
|
Moulvibazar
|
62
|
sreemangal
|
474
|
824
|
UIIP-BC/PCO/W-169
|
Construction of RCC Road side drain at Jalalia road north side starting from vanugach Road to Khalighat road chowmuhuna ch. 0.00-660.00m
|
|
|
0.00
|
0.00
|
165.36
|
M/S Suma Enterprise
|
164.82
|
06/09/2020
|
13/09/2020
|
12/09/2021
|
100
|
128.85
|
78
|
29/09/2022
|
|
334
|
Moulvibazar
|
62
|
sreemangal
|
474
|
824
|
UIIP-BC/PCO/W-168
|
Construction of BC Road side Drain at Collage road starting from chowmuhona point to collage road'' bridge, (ch. 00- 675.00m)
|
|
|
0.00
|
0.00
|
190.05
|
Abu Bakar Ahmed & Sons
|
189.00
|
03/09/2020
|
10/09/2020
|
09/09/2021
|
100
|
170.34
|
91
|
29/09/2022
|
|
335
|
Moulvibazar
|
62
|
sreemangal
|
474
|
824
|
UIIP-BC/PCO/W-60
|
Construction of RCC Road side drain at Puranbazar approch to sagordigi road sagordigi pukurpard road ch.00-266.00m
|
|
0.27
|
0.00
|
0.00
|
34.78
|
M/S Suma Enterprise
|
34.22
|
11/01/2021
|
13/01/2021
|
12/01/2022
|
100
|
33.56
|
98
|
29/09/2022
|
|
336
|
Moulvibazar
|
62
|
sreemangal
|
474
|
824
|
UIIP-BC/PCO/W-59
|
Construction of RCC Road side drain at Moulvibazar road starting form Jame mosque road to 1no bridge ch.00-450.00m
|
|
0.45
|
0.00
|
0.00
|
116.33
|
Abu Bakar Ahmed & Sons
|
115.84
|
10/01/2021
|
13/01/2021
|
12/01/2022
|
100
|
96.97
|
84
|
29/09/2022
|
|
337
|
Moulvibazar
|
62
|
sreemangal
|
474
|
824
|
UIIP-BC/PCO/W-58
|
Construction of RCC Road side drain at Habigonj road starting from Mucca market to Hobigonj bridge near fire service office ch.00-507.00m
|
|
0.51
|
0.00
|
0.00
|
149.05
|
Abu Bakar Ahmed & Sons
|
163.34
|
10/01/2021
|
13/01/2021
|
12/01/2022
|
100
|
163.33
|
100
|
29/09/2022
|
|
338
|
Munshiganj
|
33
|
munshiganj-s
|
244
|
824
|
UIIP-BC/PCO/W-624
|
A) Improvement of existing BC road by DC starting from Nagarkasba Ayna Cinema Hall more to Mirkadim Bazar Mosque Ch. 0.00m-1290.00m in ward no 07, 08 & 09 under Mirkadim Pourashava. (Salvage Amount 106236.00 BDT)
B) Improvement of existing damaged brick drain beside road starting from Nagarkasba Ayna Cinema Hall more to Mirkadim bazar Mosque with RCC Ch. 0.00m-110.00m in ward no. 07, 08 & 09 under Mirkadim Pourashava (Salvage Amount 98843.00 BDT)
|
|
|
|
|
161.74
|
|
0.00
|
|
|
|
0
|
0.00
|
0
|
04/11/2024
|
|
339
|
Munshiganj
|
33
|
munshiganj-s
|
244
|
824
|
UIIP-BC/PCO/W-608
|
A) Improvement of BC Road from Ramgopalpur Mosque to Rikabibazar Bridge (Ch.+0.00 to +770.00m), Under Mirkadim Pourashava, District: Munshiganj.
B) Improvement of BC Road from Rikabibazar Bridge to Ayna Cinema Hall (Ch.+770.00m to +1340.00m) Including RCC Side Drain Under Mirkadim Pourashava, District: Munshiganj.
|
|
1.34
|
|
|
200.51
|
Rafiq Construction Co. (Pvt.) Ltd.
|
219.46
|
04/06/2023
|
11/06/2023
|
10/06/2024
|
100
|
219.11
|
100
|
04/11/2024
|
|
340
|
Munshiganj
|
33
|
munshiganj-s
|
244
|
824
|
UIIP-BC/PCO/W-533
|
(A) Construction of 01 No Box Culvert (2x2.5x3.0x6.0m) Near Rekabi Bazar Fish Market on Rekabi Bazar Main Road Under Mirkadim Pourashava.
(B) Construction of RCC Road from Sipahipara Main Road to Chondontola Bridge at (Ch.00.00 to 0+612.00m) including palasiding work at (Ch.0+333.00m to 0+365.00m & Ch:0+536.00m to 0+612.00m) & R.C.C Drain (Ch:00.00 to 0+125.00m) Under Mirkadim Pourashava, Munshiganj.
|
|
|
6.00
|
|
142.32
|
M/S Khan Enterpise
|
153.59
|
18/10/2022
|
27/10/2022
|
27/10/2023
|
100
|
152.81
|
100
|
04/11/2024
|
|
341
|
Munshiganj
|
33
|
munshiganj-s
|
244
|
824
|
UIIP-BC/PCO/W-430
|
Construction of RCC Road from Rikabi Bazar- Sipahipara main road towards east near H/O Selim at Golapbag (Ch: 0+00 to 0+154m) Link (Ch: 0+00 to 0+076m) towards South near Golapbag mosjid Under Mirkadim Pourashava Munshiganj (Including Side Drain 154.00m)
|
|
0.23
|
|
|
57.72
|
M/S Khan Enterpise
|
62.58
|
19/10/2022
|
27/10/2022
|
27/10/2023
|
100
|
62.21
|
100
|
04/11/2024
|
|
342
|
Munshiganj
|
33
|
munshiganj-s
|
244
|
824
|
UIIP-BC/PCO/W-432
|
Construction of RCC Road from H/O Akber at Goppara to Rikabi Bazar Isamoti khal at bot tolar moor opposite site of Sajib telecom including RCC side drain at Ch00.00-30.00m. under Mirkadim pourashava District : Munshiganj.
|
|
0.30
|
0.00
|
0.00
|
80.48
|
M/S Samrat Traders
|
74.02
|
29/05/2022
|
05/06/2022
|
04/06/2023
|
100
|
73.10
|
100
|
04/11/2024
|
|
343
|
Munshiganj
|
33
|
munshiganj-s
|
244
|
824
|
UIIP-BC/PCO/W-431
|
Construction of RCC Road from BADC Godown towards west upto H/O Hanif Bapary at Shariatnagar including side Drain Ch00.00-300.00m under Mirkadim pourashava District : Munshiganj.
|
|
0.30
|
0.00
|
0.00
|
96.43
|
M/S Samrat Traders
|
87.05
|
14/06/2022
|
21/06/2022
|
20/06/2023
|
100
|
84.30
|
100
|
04/11/2024
|
|
344
|
Munshiganj
|
33
|
munshiganj-s
|
244
|
824
|
UIIP-BC/PCO/W-282
|
Construction of RCC Drain from Godi of Eusuf Mia at Kamalarhat to Harishora road via nagarkasba bridge Ch00.00-360.00m.
|
|
|
0.00
|
0.00
|
52.11
|
M/S Samrat Traders
|
51.92
|
28/06/2021
|
05/07/2021
|
04/07/2022
|
100
|
51.53
|
100
|
04/11/2024
|
|
345
|
Munshiganj
|
33
|
munshiganj-s
|
244
|
824
|
UIIP-BC/PCO/W-281
|
Construction of RCC Road from Mirkadem Fire Serfvice Office to Saudia Rice Mill at Tilardichor Ch00.00-250.00m.
|
|
0.25
|
0.00
|
0.00
|
43.77
|
Rafiq Construction Co (PVT) Ltd
|
39.39
|
28/06/2021
|
05/07/2021
|
04/07/2022
|
100
|
35.39
|
100
|
04/11/2024
|
|
346
|
Munshiganj
|
33
|
munshiganj-s
|
244
|
824
|
UIIP-BC/PCO/W-280
|
Construction of RCC Road from Mirkadim Fire Serfvice Office to BADC Godown Ch00.00-300.00m.
|
|
0.30
|
0.00
|
0.00
|
68.42
|
Rafiq Construction Co (PVT) Ltd
|
61.58
|
28/06/2021
|
05/07/2021
|
29/06/2022
|
100
|
61.44
|
100
|
04/11/2024
|
|
347
|
Munshiganj
|
33
|
munshiganj-s
|
244
|
824
|
UIIP-BC/PCO/W-278
|
Construction of RCC Drain from Mirkadem Fire Serfvice Office to Saudia Rice Mill at Tilardichor Ch00.00-205.00m.
|
|
|
0.00
|
0.00
|
29.59
|
Rafiq Construction Co (PVT) Ltd
|
26.64
|
28/06/2021
|
05/07/2021
|
04/07/2022
|
100
|
26.04
|
100
|
04/11/2024
|
|
348
|
Munshiganj
|
33
|
munshiganj-s
|
244
|
824
|
UIIP-BC/PCO/W-283
|
Construction of RCC Road from Godi of Eusuf Mia at Kamalarhat to Harishora road via nagarkasba bridge Ch00.00-360.00m.
|
|
0.36
|
0.00
|
0.00
|
74.02
|
M/S Samrat Traders
|
73.94
|
28/06/2021
|
|
04/07/2022
|
85
|
51.80
|
70
|
29/09/2022
|
|
349
|
Munshiganj
|
33
|
munshiganj-s
|
244
|
824
|
UIIP-BC/PCO/W-15
|
Construction of RCC road from Godi of Nizam uddin at Kamalaghat to Munshiganj Polytechnic Institute Ch00.00-300.00m.
|
|
0.30
|
0.00
|
0.00
|
97.00
|
M/S Samrat Traders
|
96.86
|
19/10/2020
|
|
25/10/2021
|
100
|
96.86
|
100
|
29/09/2022
|
|
350
|
Munshiganj
|
33
|
munshiganj-s
|
244
|
824
|
UIIP-BC/PCO/W-14
|
Construction of RCC Box drain from Godi of Nizam uddin at Kamalaghat to to Munshiganj Polytechnic Institute Ch 00.00-300.00m.
|
|
|
0.00
|
0.00
|
59.50
|
M/S Redoy Enterprise
|
59.47
|
19/10/2020
|
|
25/10/2021
|
100
|
58.59
|
98
|
29/09/2022
|
|
351
|
Munshiganj
|
33
|
munshiganj-s
|
244
|
824
|
UIIP-BC/PCO/W-13
|
Construction of RCC road from house of Salahuddin at Kalindipara to Mirapara main road near Mirapara Mosjid Ch. 00.00-430.00m
|
|
0.43
|
0.00
|
0.00
|
84.00
|
Rafiq Construction Co (PVT) Ltd
|
85.98
|
21/10/2020
|
|
27/10/2021
|
100
|
82.78
|
96
|
29/09/2022
|
|
352
|
Munshiganj
|
33
|
munshiganj-s
|
244
|
824
|
UIIP-BC/PCO/W-12
|
Construction of RCC drain from house of Salahuddin at Kalindipara to Mirapara main road near Mirapara Mosjid Ch. 00.00-430.00m.
|
|
|
0.00
|
0.00
|
61.50
|
Rafiq Construction Co (PVT) Ltd
|
61.44
|
21/10/2020
|
|
27/10/2021
|
100
|
61.44
|
100
|
29/09/2022
|
|
353
|
Natore
|
46
|
natore-s
|
335
|
824
|
UIIP-BC/PCO/W-395
|
1.Construction of Road By RCC Starting from (a) Chokrampur H/o Atiur Rahman to H/o Hasan at-Chakrampur (Ch00-160.00m) word no -03 (b) Charman para Natore Rajshahi Tarminal to Samim shop (Ch00-230.00m) word no -03, Under-Natore Pourashava.
2.Construction of Road By RCC Starting from (a) Mollikhati Bazer H/o Arsed To H/o Momotaj at-Mollikhati (Ch00-450.00m) word no -07 Under-Natore Pourashava.2.(b) Kandivita H/o Mansur Rahman To H/o Dalim at-Kandivita (Ch00-75.00m) word no -05 Under-Natore Pourashava.
3,Construction of Road By RCC Starting from (a) Tebaria H/o abul Hosen (dhan hata) to H/o Afajat-Tebaria,(Ch00-210.00m).3(b) Tebaria H/o abul Hosen (dhan hata) to Tebaria primari School(Ch00-160.00m) © Tebaria H/o Sabu to Nojrul shop at-Tebaria (Ch00-250.00m) word no -08, Under-Natore Pourashava.
4.Construction of Road By RCC Starting from Natore Bogra Main Road to Madrasha more Bazer at-Madrashamore (Ch00-150.00m) word no-03, Under-Natore Pourashava.
|
|
1.69
|
0.00
|
0.00
|
195.09
|
M/S Sarkar Construction
|
195.09
|
14/11/2021
|
21/11/2021
|
13/11/2022
|
100
|
187.40
|
96
|
29/09/2022
|
|
354
|
Natore
|
46
|
natore-s
|
335
|
824
|
UIIP-BC/PCO/W-394
|
1.Rihabilitation of Road by Carpeting Starting from Natore Bogra Main road (Poribar poricolpona Office) to Natore Bogra Main road (Polli Doridro Office) (Ch00-660.00m) at- Hajra natore ,word no -03, Under-Natore Pourashava.
2.Rihabilitation of Road by Carpeting Starting from Charmanpara (Mamun Confeksonari) to Charmanpara Bodar more mosque (Ch00-870.00m) at- Charmanpara ,word no -03, Under-Natore Pourashava.
3.Rihabilitation of Road by Carpeting Starting from Natore Rajshahi Main Road (H/o Secretary Mir.Ozit) to Uttom shop (Ch00-500.00m) at- Charmanpara ,word no -03, Under-Natore Pourashava.
4.Rihabilitation of Road by Carpeting Starting from (a) H/o Ikbal Hosen to H/o Moksed toward Railway coloni at-Chokbodonath (Ch00-425.00m) word no -09, (b) H/o Dulu to Chokbodonath Eadgha Fild at-Chokbodonath (Ch00-400.00m) word no -09, © H/o Khadeza to H/o Aslam at-Chokbodonath (Ch00-225.00m) word no -09 Under-Natore Pourashava.
|
|
3.08
|
0.00
|
0.00
|
139.67
|
Md. Anisur Rahman
|
139.00
|
14/11/2021
|
21/11/2021
|
13/11/2022
|
100
|
137.35
|
99
|
29/09/2022
|
|
355
|
Natore
|
46
|
natore-s
|
335
|
824
|
UIIP-BC/PCO/W-393
|
1.Rihabilitation of Road by Carpeting Starting from (a) Natore pourashava station road H/o Korsed to H/o Adv.Adil Towerds Mirpara Mosque at- Alaipr,(Ch00-750.00m) word no-06 (b)Alaipur Old boyes School at- Alaipr,(Ch00-250.00m) word no-06 , © Alaipur Old boyes School to Medical road at- Alaipr,(Ch00-150.00m)) word no -06 Under natore Pourashava.
2. Rihabilitation of Road by Carpeting Starting from Borgasa Haf rasta main road (Razib medisin shop) to kollage jola at-Hafrasta, (Ch00-820.00m) word no -07, Under-Natore Pourashava.
(3)Rihabilitation of Road by Carpeting Starting from Borgasa kollage jola Both (East & west) side at-Borgacha, word no -
|
|
2.15
|
0.00
|
0.00
|
141.12
|
M/s MN Trade
|
141.01
|
14/11/2021
|
21/11/2021
|
13/11/2022
|
100
|
140.99
|
100
|
29/09/2022
|
|
356
|
Natore
|
46
|
natore-s
|
335
|
824
|
UIIP-BC/PCO/W-392
|
1.Rihabilitation of Road by Carpeting Starting form Natore Pourashava station road (Sanmun School road) To Main road at Borgasa(Ch.00-240) Under Natore Pourashava.
(2) Rihabilitation of Road By Carpeting Starting from(a) Horishpur (Mehejonibagan) Shorab Shoptowar calector school (x-Drain) at Hajra Natore word no 03, Under Natore Pourashava (Ch.650.00m) (b) Rihabilitation of Road by Carpeting Starting from (Razbari get)Mamun Shop to H/O Sumon at Chukirpar, ward No 02 Under Natore Pourashava (Ch.00-350.00m)
(3)Rihabilitation of Roiad by Carpeting Starting from Garikhana gaward (North side) Lokman Farniture to H/O Partho Chokroborti at-Kurmitola word no-02(Ch.00-360.00m)Under Natore Pourashava
(4)Rihabilitation of Road by Carpeting Starting from H/O Bokul to H/O Nur Islam at Kandivita (Ch.00-280.00m) Word no-05, under Natore Pourashava.
|
|
1.23
|
0.00
|
0.00
|
80.51
|
M/s Zabeda Enterprise
|
80.31
|
14/11/2021
|
21/11/2021
|
20/11/2022
|
60
|
0.00
|
0
|
29/09/2022
|
|
357
|
Natore
|
46
|
natore-s
|
335
|
824
|
UIIP-BC/PCO/W-224
|
(a) Construction Of Road By RCC Starting From (a) Alaipur main Road To Sahin school at Alaipur ,(Ch.00-220.00m)
(b) Main Road (Reza Badsha Farniture Shope ) To Nur Bag Mosque at Alaipur (Ch:00-250.00m),
(c) Shahin School to Zila Porishod oditorium at Alaipur (Ch:00-160.00m)
(d)Medha Coching To Nichabazar at Alaipur (Ch:00-200.00m) Word no-06, Under Natore Paurashava ,
(e) Sonali Bank Nichabazar Road .at Alaipur (Ch:00-200.00m) Under Natore Paurashava ,
(f).Constraction of Road by RCC Starting From (a) Kamarpara sen Bostrolay to Kamarpara Mondir at Kamarpara ,(Ch:00-220.00m)
(g) Batargoli H/O Mastafa Master to Ho Ikbal at Alaipur (Ch:00-220.00m),Under Natore Paurashava.
|
|
1.47
|
0.00
|
0.00
|
177.57
|
M/S Hossain Enterprise
|
143.15
|
25/11/2020
|
12/02/2020
|
12/01/2021
|
100
|
125.64
|
88
|
29/09/2022
|
|
358
|
Natore
|
46
|
natore-s
|
335
|
824
|
UIIP-BC/PCO/W-135
|
1. Construction of Drain by RCC Starting From Alaipur Adv.Dill Mohammad House To Narod River (Prokaser More)at Alaipur word No 06 Ch.0.00-460m
2.Alaipur Natore Rajshahi RSD Road to Shahin coching & East Side of Onima Chowdhury Oditoriam at Alaipur Word No 06 Under Natore Paurashava Ch.0.00-170m Under Natore Paurashava .
|
|
0.17
|
0.00
|
0.00
|
83.82
|
M/s Pinki Construction
|
70.32
|
27/09/2020
|
04/10/2020
|
03/10/2021
|
100
|
70.09
|
100
|
29/09/2022
|
|
359
|
Natore
|
46
|
natore-s
|
335
|
824
|
UIIP-BC/PCO/W-134
|
1. Construction of Drain by RCC Starting From Natore Paurasha Station Road H/O House to H/O Adv.Adl at Alaipur Ch.0.00-400.00m Word No 06.
2.Alaipur old boyes school to Liakot Bridge at Alaipur Ch.0.00-250.00m Word No 06 under Natore Paurasha.
|
|
|
0.00
|
0.00
|
69.09
|
M/s Pinki Construction
|
59.00
|
27/09/2020
|
04/10/2020
|
03/10/2021
|
100
|
58.72
|
100
|
29/09/2022
|
|
360
|
Natore
|
46
|
natore-s
|
335
|
824
|
UIIP-BC/PCO/W-133
|
1. Construction of Drain by RCC Starting From Borgasa Haf Rasta Main Road Rajib Medisin Shop to Collage Jola at Haf Rasta Ward no 07 Under Natore Paurasha Ch.0.00-800m.
|
|
|
0.00
|
0.00
|
95.32
|
M/s Pinki Construction
|
80.39
|
27/09/2020
|
04/10/2020
|
03/10/2021
|
96
|
76.56
|
95
|
29/09/2022
|
|
361
|
Natore
|
46
|
singra
|
345
|
824
|
UIIP/ BC/PCO/W-385
|
(A) Construction of RCC Road from Upazila BC Road to Korim house at Godown para (Ward No-08) under Singra Paurashava (Ch.0+00 -0+374.00m). Link: Natore Bogura highway to Maa Veriety store (Ch.0+00 -0+105.00m).
(B) Construction of RCC Drain with Slab from Arif house to Gur River at Ningoin Adarsha gram (Ward No-07) under Singra Paurashava (Ch.0+00 -0+168.00m).
(C) Construction of RCC Drain with Slab from Hamid house to Gur River at Ningoin Adarsha gram (Ward No-07) under Singra Paurashava (Ch.0+00 -0+171.00m).
|
|
0.71
|
0.00
|
0.00
|
118.14
|
M/s Hossain Enterprise
|
102.64
|
21/09/2021
|
29/09/2021
|
28/09/2022
|
100
|
0.00
|
0
|
29/09/2022
|
|
362
|
Natore
|
46
|
singra
|
345
|
824
|
UIIP/ BC/PCO/W-384
|
(A) Construction of RCC Road from Mollah para BC Road to CNB Office at Mollah para (Ward No-04) under Singra Paurashava (Ch.0+00 -0+243.00m).
(B) Construction of Road by DBC Starting from Tajuddin house to Saidul Shop at Katuabari (ward no-11) under Singra paurashava (Ch.0+00-0+600.00).
(C) Improvement of Road by DBC Starting from Rofiq sarder house to Lotif Mondol house at Ningoin natunpara ( ward no-12) under Singra Paurashava (Ch.2+000 -2+235m).
|
|
3.07
|
0.00
|
0.00
|
97.99
|
M/s MN Trade
|
84.58
|
21/09/2021
|
29/09/2021
|
28/09/2022
|
60
|
54.09
|
64
|
29/09/2022
|
|
363
|
Natore
|
46
|
singra
|
345
|
824
|
UIIP/ BC/PCO/W-383
|
(A) Construction of RCC Road with Slope protection from Ningoin high School to Joyanta house at Ningoin ghunpara (Ward No-07) under Singra Paurashava (Ch.0+00 -0+362.00m).
|
|
0.36
|
0.00
|
0.00
|
94.45
|
M/S HOSSAIN ENTERPRISE
|
82.26
|
21/09/2021
|
29/09/2021
|
28/09/2022
|
10
|
0.00
|
0
|
29/09/2022
|
|
364
|
Natore
|
46
|
singra
|
345
|
824
|
UIIP/ BC/PCO/W-382
|
1 Construction of RCC Road from Krishi office Road to Abu Kasem house at Chandpur Ward No-04 under Singra Paurashava Ch.000 -0190.00m.
2 Construction of RCC Drain with Slab from Krishi Office Road to Cholonbill at Chandpur Ward No-04 under Singra Paurashava Ch.000 -0276m.
3 Construction of RCC Drain with Slab from Dheren house to Ronjon house at Kantapukuria Ward No-01 under Singra Paurashava Ch.000 -0154.00m.Link Benoy house to Sreejon house Ch.000 -030.00m
|
|
0.19
|
0.00
|
0.00
|
111.82
|
Ethen Enterprise (Pvt.) Ltd.- M/S. Sinthia Enterprise (JV)
|
95.97
|
21/09/2021
|
29/09/2021
|
28/09/2022
|
0
|
0.00
|
0
|
29/09/2022
|
|
365
|
Natore
|
46
|
singra
|
345
|
824
|
UIIP/ BC/PCO/W-228
|
(A) R-12: Construction of Submerged RCC Road from Ningoin Bus-Stand to Ningoin Notun Para Road with X-Drain at Ningoin Notun Para (Ward No. 7 & 12) under Singra Paurashava (Ch. 0+00 - 0+320m). (B) R-13: Construction of RCC Road from Anowara Pilot School to Mojammel house at Moheshchandrapur (Ward No. 10) under Singra Paurashava (Ch. 0+00 - 0+335m).
|
|
0.66
|
0.00
|
0.00
|
82.29
|
M/S Purbanchal Trade
|
86.37
|
24/01/2021
|
|
24/01/2022
|
100
|
41.50
|
49
|
29/09/2022
|
|
366
|
Natore
|
46
|
singra
|
345
|
824
|
UIIP/ BC/PCO/W-227
|
(A) R-02: Construction of RCC Road from Thana Mosgue to Kasem house at Masinda (Ward No. 01) under Singra Paurashava (Ch. 0+00 - 0+138 m). Link: Manu Master House Road (Ch. 0+00 - 0+ 45.00m m).
(B) R-10: Improvement of Road by DBC Starting from Omar Master house to Esmail house at Uttar Damdama (Ward No. 2) under Singra Paurashava (Ch. 0+00 - 0+415m). Link: Mohsin house to Akbar house at Uttar Damdama (Ch. 0+00 - 0+60m).
(C) R-11: Construction of RCC Road from Mozzammel house to Esmail house at Uttar Damdama Madhapara (Ward No. 2) under Singra Paurashava (Ch. 0+00 - 0+365m). Link: Katazola Bridge Road (Ch. 0+00-0+145m).
|
|
1.16
|
0.00
|
0.00
|
79.54
|
M/S Purbanchal Trade
|
83.49
|
24/01/2021
|
|
24/01/2022
|
100
|
53.91
|
65
|
29/09/2022
|
|
367
|
Natore
|
46
|
singra
|
345
|
824
|
UIIP-BC/PCO/W-226
|
(A) R-06: Construction of RCC Road from Prof. Ashraf house to Tower Road at Chandpur (ward no. 04) under Singra Pourasava. Ch. 0+000- 0+340m
(B) D-02: Construction of RCC Drain with Slab from Prof. Ashraf house to Tower Road at Chandpur (ward no. 04) under Singra Pourasava. Ch. 0+000- 0+340m
(C) R-05: Construction of RCC Road from Shahnaj house to Mohasin house at Kantapukuria (ward no. 01) under Singra Pourasava(Ch. 0+000- 0+235m). Link: Abu Bakkar Siddique House Road (Ch.0+000- 0+115m)
|
|
1.03
|
0.00
|
0.00
|
108.36
|
M/s Das Traders
|
113.01
|
22/12/2020
|
|
22/12/2021
|
100
|
112.20
|
99
|
29/09/2022
|
|
368
|
Natore
|
46
|
singra
|
345
|
824
|
UIIP-BC/PCO/W-225
|
(A) R-07: Improvement of Road by DBC starting from Mahesh Shop to Haspukuria Road at Katapukuria (ward no.-1) under Singra Pourasava. Ch. 0+000- 0+875m(B) R-08: Improvement of Road by DBC starting from Singra Fish Market to Natore-Bogura Highway Road at Petrobangla (ward no.-08) under Singra Pourosava (Ch. 0+000- 0+290m). Link-01:Singra Municipallity Office Road (Ch.0+00- 0+20m). Link-02: CNG Stand Road (Ch. 0+000- 0+100m).
|
|
1.29
|
0.00
|
0.00
|
96.09
|
M/s M N Trade
|
100.79
|
22/12/2020
|
|
22/12/2021
|
60
|
39.00
|
39
|
29/09/2022
|
|
369
|
Natore
|
46
|
singra
|
345
|
824
|
UIIP-BC/PCO/W-87
|
(A) (a) (R-09) Construction of RCC Road from Uttar Damdama Eidgah Field to Hossain House at Uttar Damdama (Ward no-02) under Singra Paurashava (Ch.0+00- 0+335.00m).
(B) (R-01) Construction of RCC Road from Saiful House to Dilip House at Masinda (Ward no-01) under Singra Paurashava (Ch.0+00-0+185.00m).
(C) (D-03) Construction of RCC drain with Slab from Dilip House to River Ghat at Masinda (ward no-01) Under Singra Paurashava (ch.0+00-0+235.00m).
|
|
0.52
|
0.00
|
0.00
|
83.33
|
M/S. Das Traders
|
75.79
|
28/07/2020
|
04/08/2020
|
03/08/2021
|
100
|
75.52
|
100
|
29/09/2022
|
|
370
|
Natore
|
46
|
singra
|
345
|
824
|
UIIP-BC/PCO/W-80
|
(A) (R-04) Improvement of Road by DBC Starting from Natore-Bogura Highway Road to Salam Morh at Katuabari (Ward no-6 & 11) under Singra Paurashava (Ch.0+00-0+2+460.00m).(B) (R-03) Construction of RCC Road from Mozahar House to Mobarak House at Ningoin Uttar Para (Ward no-07) under singra Paurashava (Ch.0+00-0+970.00m).
|
|
3.43
|
0.00
|
0.00
|
225.95
|
M/S Islam Construction & M/s MN Trade (JV)
|
205.17
|
30/07/2020
|
05/08/2020
|
04/08/2021
|
100
|
204.99
|
100
|
29/09/2022
|
|
371
|
Noakhali
|
7
|
begumganj
|
86
|
824
|
UIIP/PCO/G-48
|
Implementation & Supply 340 nos Waste Basket (120 ltr) & 36 nos Non-motorized vehicle 9van) under Chowmuhani Pourashava District: Noakhali.
|
|
|
|
1.00
|
39.93
|
RFL Plastrics Limited
|
26.97
|
13/03/2024
|
13/03/2024
|
09/09/2024
|
60
|
15.00
|
56
|
15/10/2024
|
|
372
|
Noakhali
|
7
|
begumganj
|
86
|
824
|
UIIP-BC/PCO/W-650
|
" (1)Improvement of read from Ponu Beppary bari to
Kabil Khan hazi via by AUPCO DOC Ward no-9 Under
Chowmuhani Pourashava, Noakhali. (540.00m length) "
" (2) Improvement of road from Badinath road to
Chatarpaiya road via Toron hart ad by RCC
(172.00m Length), Ward-6, Chowmuhani Pourashava, Noakhali. "
" (3) Improvement of meeting road between Yousuf
market-Peskar market mad and Akram Uddin Hazi
bari road by RCC (200.00m length) with 75.00
Retaining Wall at Wand-02. Under Chowmahani
Pourashava, Noakhali. "
" (4) Improvement of road from Nazirpur (1) Zolnal
abeden road to Minto Miar bari (ch. 0+00-0+885), (2) MP House road (ch. 0+00-359)m by DBC at Ward-02 Under Chowmuhani Pourushava, Noakhali.Protective Work=326m,Length=1244m. "
" (5) Construction of Public Toilet at hawkers market
Under ward no-05 Chowmuhani Pourasheva "
|
|
2.16
|
|
1.00
|
295.21
|
Mona-Spondhon-JV
|
250.13
|
08/04/2024
|
15/04/2024
|
14/04/2025
|
25
|
27.88
|
11
|
15/10/2024
|
|
373
|
Noakhali
|
7
|
begumganj
|
86
|
824
|
UIIP-BC/PCO/W-582
|
1. Improvement of road from Ummod Ali Hazi bari to Nirapod Housing Road by RCC (Ch.0+00-0+140), Link-1 (Ch.0+00-0+30), Link-2 (Ch.0-00-0-10) at word no-03. Under Chowmuhani Pourashiva. Noakhali.
" 2. Improvement of road from Topadar Pol-Momtaz miar School Road to Guard bari road by RCC (Ch0+00-0+215) at ward no-02 Under Chowmuhani Pourashava, Noakhali
"
" 3. Improvement of road from RHD Lakshmipur road to Boksho ali munshi bari road by RCC (Ch.0+00-0+177) at ward no-01, Under Chowmuhani Pourashava, Noakhali
"
" 4. Improvement of road from Shajur Dokan-Khalpar road to Jhontu Patowary bari road via Hukka Member bari by RCC (Ch.0+00- 0+235), Link-(0+00-0+040) at ward no-05, Under Chowmuhani Pourashava, Noakhali
"
" 5. Improvement of road from Arif Hazi Road to Gine bari (Pach bari) road by RCC (Ch.0+00-491), Protective work-169.00m at ward o-08 Under Chowmuhani Pourashava, Noakhali
"
" 6. Improvement of road from Kismot Hazi bari (Degree Hostel Road) to Khobir Mia bari road by DBC (Ch.0+00-0+225), Protective work 61.00m at ward o-08 Under Chowmuhani Pourashava, Noakhali
"
" 7. Improvement of road from Arif Hazi Road to Hazipur Eidgah road by RCC (Ch.0+00-0-68) Protection work 50m at wird o-06 Under Chowmuhani Pourashava, Noakhali.
"
|
|
1.63
|
|
|
200.19
|
Maa-Islam (JV)
|
213.17
|
28/05/2023
|
05/06/2023
|
04/06/2024
|
76
|
129.45
|
61
|
15/10/2024
|
|
374
|
Noakhali
|
7
|
begumganj
|
86
|
824
|
UIIP-BC/PCO/W-331
|
A) Construction of RCC drain at nazirpur karani bari up to canal at ward no-01, under chowmuhani pourashva.(Ch-0+00-0+.260m) link=40 m (B) Construction of RCC drain at nazim uddin bapari bari road at ward no-01, under chowmuhani pourashva.(Ch-0+00-0+.0.160 m(C) ) Construction of RCC drain at gonipur haradon bhuyan bari to east side existing pourashava drain at ward no-06, under chowmuhani pourashva.(Ch-0+00-0+.0.95 m) (D) ) Construction of RCC drain from bus tarminal drain towards north truck tarminal at ward no-03, under chowmuhani pourashva.(Ch-0+00-0+.0.38 m)
|
|
|
0.00
|
0.00
|
99.65
|
M/S Mona Construction
|
99.61
|
24/06/2021
|
30/06/2021
|
12/09/2022
|
100
|
99.22
|
100
|
15/10/2024
|
|
375
|
Noakhali
|
7
|
begumganj
|
86
|
824
|
UIIP-BC/PCO/W-333
|
(A) Improvement of bus Tarminal south road at word no -03,(Ch-0+00+0+150m) under chowmohoni pourashava Area ,Noakhali.
|
|
0.15
|
0.00
|
0.00
|
24.33
|
M/S. Molla Traders
|
24.33
|
30/05/2021
|
01/06/2021
|
30/05/2022
|
100
|
23.38
|
96
|
29/09/2022
|
|
376
|
Noakhali
|
7
|
begumganj
|
86
|
824
|
UIIP-BC/PCO/W-332
|
(A) Construction of 3 vant RCC box culvart at tulatoli khal poposed new comfort genarel hospital & diagonistic center point at ward no-07, under chowmuhani pourashva.(B) Construction of 3 vant RCC box culvart atsouth bazar to golabari road shutki hata point at ward no-04, under chowmuhani pourashva.
|
|
|
18.00
|
0.00
|
85.68
|
M/S. Hoque & Brothers
|
85.67
|
24/06/2021
|
|
30/06/2022
|
100
|
43.67
|
51
|
29/09/2022
|
|
377
|
Noakhali
|
7
|
begumganj
|
86
|
824
|
UIIP-BC/PCO/W-330
|
(A) Improvment of Ganipur GP tower road remaining part ward no-06, under chowmuhani pourashva.(Ch-0+00-0+400m) (B) Improvment and protective work of taltola aluminiam factory road at ward no-08, under chowmuhani pourashva.(Ch-0+400-0+455m)(C) Improvment of road from amir hossain dokan to chan mia arottdar bari (remaining part) at ward no-09, under chowmuhani pourashva.(Ch-0+00-0+220m) (D) Improvment & maintanance of degree hostal road up to kabir uddin mia bari at ward no-07, under chowmuhani pourashva.(Ch-0+00-1+455m)
|
|
2.08
|
0.00
|
0.00
|
140.77
|
M/S Mona Construction
|
140.74
|
24/06/2021
|
30/06/2021
|
30/06/2022
|
100
|
45.41
|
32
|
29/09/2022
|
|
378
|
Noakhali
|
7
|
begumganj
|
86
|
824
|
UIIP-BC/PCO/W-181
|
(A) Improvement of shah alam chaiman road from laxmipur RHD road to joinal abedin road at word no-02 under Chowmuahni pourashava, Noakhali by BC (Ch.0+00-0+940)(B) Improvement of meherulla miar bari road at ward no-04 Under Chowmuhani pourashava by RCC ( Ch-0+00-0+95m)(C) Improvement of Bashir Ullah khan shaeb bari to Nadna-sonaimuri khalpur road at ward no-05, under chowmuhani pourashva.(Ch-0+00-0+270m)(D) Improvement of karipur wasil uddin Buiya bari road at ward no-04,Under Chowmuhani Pourashava by RCC (Ch-00+00-00+100m)(E)Construction of RCC Drain at Degree Hostel road upto culert at ward no-07,under chowmuhani pourashva.(Ch-0+00-0+270m)
|
|
1.41
|
0.00
|
0.00
|
119.75
|
M/S. Hoque & Brothers
|
121.82
|
11/08/2020
|
|
14/11/2021
|
100
|
94.58
|
78
|
29/09/2022
|
|
379
|
Noakhali
|
7
|
begumganj
|
86
|
824
|
UIIP-BC/PCO/W-180
|
(A) Improvement of mirwaridhpur jamai para road at word no -08 by RCC (Ch-0+00+0+250m) under chowmohoni pourashava Area ,Noakhal(B) Improvement of Tagar bari ,shorif sordar bari road at word no - 04 by RCC ( Ch-0+00--0+248m) link (Ch0+00-0+76m) under chowmohoni pourashava Area , Noakhal(C)Improvement Of South bazar madrahsa road at word no-04 by RCC (Ch-0+00-0+76m) link 1 (Ch-0+00-0+155m), link 2 (Ch-0+00-0+53m) under chowmohoni Pourashava Area, Noakhal(D) Improvement & Protactive wark of alipur hazi bari road ( remining part ) up to school road calvart at word no-03by RCC (Ch-0+00-0+160m) link 75m under chowmohoni pourashava Area.Noakhal
|
|
1.09
|
0.00
|
0.00
|
119.05
|
S.B Trading Corporation
|
117.04
|
09/07/2020
|
|
13/09/2021
|
100
|
115.08
|
98
|
29/09/2022
|
|
380
|
Noakhali
|
7
|
begumganj
|
86
|
824
|
UIIP-BC/PCO/W-179
|
(A) Improvement of Laximpur RHD To nazirpur Karani bari links back side of primary school via mia bari up to khalapar road at word no-01 by BC (Ch-0+00-0+350m) link 1(Ch-0+00-0+135m) link 2 (Ch-0+00-0+623m) under Chowmuhani pourashava,Noakhali.(B) Improvement of Napeter poll to kismat karimpur mosque azims shop to mondal para road at word no-07, by BC (Ch-0+00-0+840m) & Ch-0+00-0+516m) link-30m under Chowmuhani pourashava Area, Noakhali.( C) Improvement & weading of hajipur sharader bari road starting from fani road to maijde at word no-08 by BC (Ch-0+00-0+220m) under Chowmuhani pourashava Area,Noakhali.(D) Improvement of ganipur browalar bari road at word no-06 by RCC (Ch-0+00-0+150m) under Chowmuhani pourashava,Noakhali.
|
|
2.83
|
0.00
|
0.00
|
139.41
|
M/S Mona Construction
|
139.40
|
09/07/2020
|
|
13/09/2021
|
100
|
137.84
|
99
|
29/09/2022
|
|
381
|
Noakhali
|
7
|
begumganj
|
86
|
824
|
UIIP-BC/PCO/W-62
|
(A) (a) Improvement of Advocate joinal Abedin road (Contractor Pool road to Montaz mia Govt. Primari school at ward no -02 under Chowmuahni Pourashava, Noakhali by BC (Ch.0+00-2+020)(B) Improvement of road from Arif Hazi road to khalpar via Poddar bari Mosque at word no-09 under Chowmuhani Pourashava, Noakhali by RCC (Ch-0+00-290)( C) Improvement of Alipur Doctor Para road (Remaining Part) Up to Dighir Par Court road at ward no-03, under Chowmuhani pourashava,Noakhali. by BC (Ch-0+530-0+810m)
|
|
2.59
|
0.00
|
0.00
|
129.72
|
M/S Mona Construction
|
129.67
|
11/08/2020
|
|
17/11/2021
|
100
|
128.36
|
99
|
29/09/2022
|
|
382
|
Noakhali
|
7
|
begumganj
|
86
|
824
|
UIIP-BC/PCO/W-61
|
(A) Improvement of road Atia bari bridge to South bazar via food godown at ward no-04 by BC (Ch-0+00-01+090m) (B) Improvement of N. Zaman Road from Rail line to N. Zaman Govt. Primary School at ward no-05 by RCC (Ch -0+00+810m)
|
|
1.09
|
0.00
|
0.00
|
157.42
|
M/S Mona Construction
|
157.12
|
12/02/2020
|
12/09/2020
|
22/02/2022
|
100
|
153.64
|
97
|
29/09/2022
|
|
383
|
Noakhali
|
7
|
chatkhil
|
85
|
824
|
UIIP-BC/PCO/W-589
|
Construction of Ferdous mosjied From College road to Poundth bari via Fardaus Mosjied by R.C.C Ch.0-630 at ward no -05 under chatkhil pourashava, Noakhali.
Construction of public Tranport Passenger Shed (28.00sqm)at Chatkhil Bus stand Under Chatkhil Pourashava,Noakhali.
|
|
|
|
1.00
|
106.87
|
M/s Tasin Enterprise
|
105.93
|
18/02/2024
|
25/02/2024
|
25/02/2025
|
82
|
0.00
|
0
|
17/10/2024
|
|
384
|
Noakhali
|
7
|
chatkhil
|
85
|
824
|
UIIP-BC/PCO/W-584
|
(A)Estimate Construcetion of choyani Tobga molla bari Road from G.M Ruhul Amin Road To khilpara Road By R.C.C ch.0-885m at ward no -08 under chatkhil pourashava, Noakhali.
(B) Construcetion of west Sundur pur Molllick bri Road From Brige to mollick bari By R.C.C ch.0-460m at ward no -02 under chatkhil pourashava, Noakhali.
(C) Construcetion of East Gobindo pur road From G.M Ruhul amin Road to Goni Mia Sub Bari By R.C.C ch.0-775m at ward no -07 under chatkhil pourashava, Noakhali.
|
|
2.12
|
|
|
232.74
|
M/s. S S Traders
|
243.22
|
22/10/2023
|
28/10/2023
|
27/10/2024
|
81
|
219.22
|
90
|
17/10/2024
|
|
385
|
Noakhali
|
7
|
chatkhil
|
85
|
824
|
UIIP-BC/PCO/W-583/1
|
(A)Construction of RCC Road from Khilpara Road to Late Kashem Mia House ,By RCC (Ch. 0.00-275.00m at word no-06 Under Chatkhil Pourashava ,Noakhali.
|
|
0.28
|
|
|
31.85
|
SAYERA ENTERPRISE
|
31.81
|
28/05/2023
|
05/06/2023
|
04/06/2024
|
100
|
29.95
|
94
|
17/10/2024
|
|
386
|
Noakhali
|
7
|
chatkhil
|
85
|
824
|
UIIP-BC/PCO/W-583
|
(A.)Construction of Shat Baria Road From GM Ruhul Amin Road To End Point To Pourashava by R.C.C ch.0-975m at ward no -08,under chatkhil pourashava, Noakhali..(
( B.) Construction of Sunderpur School Road From School to Suma hazi bari majid (Ch.0.000-300.00m)by RCC, at ward no -02under chatkhil pourashava, Noakhali.
C)Construction of Chatkhil Govt. girls school road from shahapur road to khilpara road by R.C.C (Ch.0.00-265m at ward no -06 under chatkhil pourashava, noakhali
D.) Construction of Dasani tobga School Road From main Road To Mosjid by R.C.C Ch.0.00-300m at ward no -07under chatkhil pourashava, Noakhali
E.)Construction of Tregaria patwary bari Raod from School to Amir uddin Patwary bari by R.C.C ch.0.00-245m at ward no -01 under chatkhil pourashava, Noakhali.
|
|
2.09
|
|
|
250.75
|
M/S SS Traders
|
250.66
|
23/05/2023
|
30/05/2023
|
30/05/2024
|
67
|
127.83
|
51
|
17/10/2024
|
|
387
|
Noakhali
|
7
|
chatkhil
|
85
|
824
|
UIIP-BC/PCO/W-461
|
(1) Construction of Chayanitobga Kashim Mia Moshjid Road From Khilpara Road to Kashim Mia MOshjid Ch.0.00m-670.00 by RCC at Word No-09 Under Chatkhil Pourashava, Noakhali (2) Construction of Sunder Pur Ozibari Mosjied to Thana road by RCC Ch.0.00m-320.00m at Word No-02 Under Chatkhil Pourashava, Dist: Noakhali (3) Construction of Bheampur Masi Bepari Bari Road From BSR road to Masi Bepari bari by RCC Ch.0.00m-=541.00m at Word No-04 Under Chatkhil Pourashava Noakhali (4) Construction of Chatkhil Hawladar Bari Road From Khilpara Road to Hawlader Bari Road From Khilpara Road to Hawlader Bari Road by RCC, CH.0.00m-365.00m at Word no-06 Under Chatkhil Pourashava, Noakhali.
|
|
1.90
|
0.00
|
0.00
|
174.89
|
m/s S.S Traders
|
155.46
|
24/05/2022
|
31/05/2022
|
30/05/2023
|
100
|
128.75
|
83
|
17/10/2024
|
|
388
|
Noakhali
|
7
|
chatkhil
|
85
|
824
|
UIIP-BC/PCO/W-364
|
(A) Improvement of Chyani Tobga Shahab Bari Road from Khilpara Road to shahab bari (Ch 0.00m-365.00m), By Bituminous Dense Carpeting (DC), at Word No-08, under Chatkhil Pourashava, District: Noakhali.(B) Improvement of Chayani Tobga Hazi Momtazul Hoq Bhuyan Road from Taher Munshi Dokan to Bridge (Ch 0.00m-470.00m), By Bituminous Dense Carpeting (DC), at Word No-09, under Chatkhil Pourashava, District: Noakhali.(C) Construction of R.C.C. Drain at Bheempur East Mongazi Bepari bari(ch0.00-120.00m), At ward no.03,Under Chatkhil Pourashava, Noakhali.(D) Construction of Drain Chatkhil Jahangir sb bari road (Ch 0.00-197.00m), At ward no.06,Under Chatkhil Pourashava, Noakhali.(E) Construction of Box Culvert in front of Chayani Tobga Boro Bari,at ward No.08, under Chatkhil Pourashava, District: Noakhali.(F) Construction of Box Culvert over Chayani Tobga FSM treatment plant connecting, at ward No.09, under Chatkhil Pourashava, District: Noakhali.
|
|
0.84
|
12.00
|
0.00
|
147.51
|
S.S Traders
|
115.49
|
15/07/2021
|
23/07/2021
|
06/10/2022
|
100
|
80.87
|
70
|
29/09/2022
|
|
389
|
Noakhali
|
7
|
chatkhil
|
85
|
824
|
UIIP-BC/PCO/W-153
|
(A) Improvement of Bheempur VP sakil & Kasim mia road (Ch 00-10m) by bituminous dense carpeting at ward no-04 under Chatkhil Pourashava (B) Rehabilitation of douatlpur Bhuiyan bari kibria chairman SB road from kobir Chairman bari to bhuiyan bair (Ch 00-440m) by bituminous dense carpeting at ward no-05 under Chatkhil Pourashava (C ) Improvement of Chatkhil bapari bari road from khil para road to bapari bari (Ch 00-290m) by bituminous dense carpeting at ward no-06 under Chatkhil Pourashava (D) Improvement of doshani toboga khadua bari road (Ch 00-183m), Ibrahim bari (Ch 00-80m) Darus salam mosjid road (Ch 00-30m) by bituminous dense carpeting at ward no-07 under Chatkhil pourashava (E) Improvement of Chyani tobga wall bari road (Ch 00-320m) by bituminous dense carpeting at ward no-08 under Chatkhil Pourashava (F) Rehabilitation of chayani tobga junnat gazi bepari bari road from colleage road to gazi bari (Ch00-290m) by bituminous dense carpeting at ward no-09 under Chatkhil Pourashava (G) Construction of shaha neyamotpur mosjid road (Ch 00-25m) by RCC at ward no-09 under Chatkhil Pourashava
|
|
1.77
|
0.00
|
0.00
|
104.17
|
MS. SHAD ENTERPRISE
|
104.15
|
15/12/2020
|
|
28/02/2022
|
100
|
104.09
|
100
|
29/09/2022
|
|
390
|
Noakhali
|
7
|
chatkhil
|
85
|
824
|
UIIP-BC/PCO/W-152
|
(A) Construction of Chatkhil Bhuiyan bari mize bari road (Ch 00-45m) by RCC at ward no-06 under Chatkhil Pourashava (B) Improvement of BC road chyani tobga putol mia bari (Ch 00-91m) by Bituminos dense carpeting at ward no-09 under Chatkhil Pourashava (C ) Construction of central hospital road (Ch 00-50m) by RCC at ward no-06 under Chatkhil Pourashava (D) Improvement of dasani tobga road from bottala to BS road (Ch 00-475m) by BC at ward no-07 under Chatkhil Pourashava
|
|
1.07
|
0.00
|
0.00
|
106.18
|
M/S Galaxy Enterprise,
|
106.17
|
08/12/2020
|
|
15/12/2021
|
100
|
106.07
|
100
|
29/09/2022
|
|
391
|
Noakhali
|
7
|
chatkhil
|
85
|
824
|
UIIP-BC/PCO/W-151
|
(A) Construction of road by bheempur Councillor nazir sab bari road (Ch 00-150m) by RCC at ward no-03 under Chatkhil Pourashava .(B) Construction of road by bheempur gainer bari Mosjid road (Ch 00-510m) by Bituminous dense carpeting at ward no-04 under Chatkhil Pourashava (C ) Construction of lamchar road talukder bari to soader bari (Ch 00-200m) by RCC at ward no-05 under Chatkhil Pourashava (D) Improvement of damali road form PG School bridge road to kalarajer pool (Ch00-900m) by Bituminous dense carpeting at ward no-06 under Chatkhil Pourashava
|
|
0.15
|
0.00
|
0.00
|
127.83
|
M/S Shad Enterprise
|
127.82
|
01/10/2020
|
07/10/2020
|
04/10/2021
|
100
|
127.82
|
100
|
29/09/2022
|
|
392
|
Noakhali
|
7
|
chatkhil
|
85
|
824
|
UIIP-BC/PCO/W-34
|
(A) Improvement of Fatepur (I) Munshi bari road (ch 00-230m).(ii)chan Gazi bari (ch 00-67m) by bituminous dense carpeting at ward no-01 under Chathil Pourashava. (B) Improvement of Fatepur (i) Dorji bari road (ch 00-152m).(ii) bapari bari road (ch00-45m)by bituminous dense carperting at ward no-01under Chatkhil pourashava.Ch. 00-0.75, Bepari 00-170(C ) Improvement of Fatepur (i)Matupatwary road9ch00-130m) by bituminous dence carpeting at ward no-01under Chatkhil pourashava.(D) Improvement of Fatepur mosjid road (ch 00-130m) by bituminous dense carpeting atWard no -01 Chatkhil pourashva.(E) Construction j of Featepur (i) Washim uddin bapari road (ch 00-12m).(i) Jalal Ahamad bapari road (ch 00-35m) by RCC at ward no-01 under Chatkhil pourashava. (f) Improvement of Sunder (i) Sarkar bari road (ch 00-161m) . (ii) Shahid Dr.bari road(ch 00-84m) by bituminous dense carpeting at word no-02 ) under Chatkhil pourashava.(G) ) Improvement of Sunder Karigor bari road from palla road to masjid (ch 00-23m) by bituminous dense carpeting at ward no-03 under Chatkhil pourashava.(H) Improvement of Bheempur madrasa road from atia road to Tomijja road (ch 00-335m) by bituminous dense carpeting at ward no-04 under Chatkhil Pourashava.
|
|
1.83
|
0.00
|
0.00
|
104.85
|
M/S Galaxy Enterprise
|
104.82
|
16/07/2020
|
|
17/01/2021
|
100
|
103.96
|
100
|
29/09/2022
|
|
393
|
Noakhali
|
7
|
chatkhil
|
85
|
824
|
UIIP-BC/PCO/W-33
|
(A) Improvement of Ratepur halim Mohazon bari road (ch 00-445m) by bituminous dense carpeting at word no-01 under Chatkhil pourashava (B) Improvement of Chatkhil Thana road from patowary bari to Shahaze bari bridge (ch 00-460m) by bituminous carpeting at ward no-02 under Chatkhil Pourashava (c) Improvement of Chatkhil Thana road from B.S.R Road to patowary bari (ch 00--500m) by bituminous dense carpeting at ward no -02 under Chatkhil Pourashava.(D) Improvement of Sundorpur thana road to Bodol Kort road (ch 00-520m) by bituminous dense carpeting at word no-02,03 under Chatkhil Pourashava.(E) Construction of Doualatpur box all bepari bari road (ch 00-250m) by RCC at ward no -05 under Chatkhil Pourashava.
|
|
2.18
|
0.00
|
0.00
|
109.71
|
M/S Shad Enterprise
|
109.69
|
15/07/2020
|
|
17/01/2021
|
100
|
109.69
|
100
|
29/09/2022
|
|
394
|
Noakhali
|
7
|
chatkhil
|
85
|
824
|
UIIP-BC/PCO/W-32
|
(A) Construction of Datepur (i)Nur Alam Mia road (ch00-50m).(iii)Sree Ram bari road (ch00-135m).(iii) millick bari road (00-61m)By RCC at ward no -01under Chathil pourashava .(B) construcuction west Fatepur buter bari road (ch00-91m)by RCC at ward no -01under chatkhil pourashava ( C) Construction west ferepur Basher professor bari road (ch00-91m) by RCC Ward no-01 under Chatkhil porashava (D) construction west fatepur Harun bari road (ch00-185m)by RCC at ward no-01under Chatkhil pourashave.(E) Construction West Fetepur Chan Gazi bapari road (ch 00-160m)by RCC at ward no-01under Chatkhil prourashava . (F) Construction west Fetepur (i) kamar bari road (ch00-120m).(iii)Faruker bari road (ch00-26m) by RCC Chatkhil pourashave. (G) Improvement of West Fatepur tara bari road ( ch00-275m) by bituminous dense carpeting at waed no-01under Chatkhil pourashava. (H) Contruction of sundarpur road from porantopader bari Roton Mia bari (ch 00-170m) by RCC at ward no -02 under Chatkhil pourashava.
|
|
1.36
|
0.00
|
0.00
|
112.88
|
M/S Sumon & Nazrul Traders
|
112.86
|
16/07/2020
|
|
17/01/2021
|
100
|
112.78
|
100
|
29/09/2022
|
|
395
|
Noakhali
|
7
|
noakhali-s
|
51
|
824
|
UIIP/PCO/G-49
|
Implementation & Supply 341 nos Waste Basket (120 ltr) & 36 nos Non-motorized vehicle (van) under Natore Pourashava District: Natore.
|
|
|
|
1.00
|
39.97
|
RFL Plastrics Limited
|
27.00
|
25/03/2024
|
25/03/2024
|
23/09/2024
|
60
|
15.00
|
56
|
17/10/2024
|
|
396
|
Noakhali
|
7
|
noakhali-s
|
51
|
824
|
UIIP- BC/PCO/W-574
|
(A) Construction of Park and Playground at Noakhali Pourashava.
(B) Construction of Public Transport Passenger Shed (28.00sqm) Adjacent to Comilla-Noakhali High-Way mear Maijdee Municipal Market at ward no-05 Under Noakhali Pourashava area.
(C) Construction of Single Storied Public Toilet (Type-A) near Maijdee Municipal Market at ward no-05 Under Noakhali Pourashava area.
"
|
|
|
|
|
204.50
|
M/S Md Kamal Uddin
|
209.64
|
17/12/2023
|
24/12/2023
|
23/12/2024
|
41
|
40.12
|
19
|
17/10/2024
|
|
397
|
Noakhali
|
7
|
noakhali-s
|
51
|
824
|
UIIP- BC/PCO/W-585
|
Constraction work of dattarhat one-storied vagetable & Agrecultural Product market on 5 storied foundation building (Floor area 314.00sqm) at word no-06 under Noakhali Pourashava.
|
|
|
|
1.00
|
98.07
|
M/S Azad Enterprise
|
98.05
|
14/05/2023
|
21/05/2023
|
20/05/2024
|
100
|
70.01
|
71
|
17/10/2024
|
|
398
|
Noakhali
|
7
|
noakhali-s
|
51
|
824
|
UIIP- BC/PCO/W-289
|
(A) Re- Construction of 3x4.5mx4.5m RCC Culvert on Binodpur Khal (infront of Gopal road) at ward no-06 under Noakhali Pourosava area.(B) Re- Construction of 2x3.6mx3.6m RCC Culvert on Chagol Mara Khal (Datter Hat Goru Bazar to kacha bazar connecting) at ward no- 06 under Noakhali Pourosava area.
|
|
|
16.20
|
0.00
|
80.40
|
M/S Zihad Enterprise
|
80.33
|
29/12/2020
|
05/01/2021
|
04/01/2022
|
100
|
80.06
|
100
|
29/09/2022
|
|
399
|
Noakhali
|
7
|
noakhali-s
|
51
|
824
|
UIIP- BC/PCO/W-288
|
(A) Construction of RCC Drain (starting from Town Hall to back side of Sonali Bank besides Flat Road) Ch. 0.00-99m, Ch. 99- 525 & 0.000-63m at ward no. 04 under Noakhali Pourosava area.(B) Construction of RCC Drain besides of Khadimul Islam road Ch. 0.000-0.290m at ward no.-04 under Noakhali Pourosava area.
|
|
|
0.00
|
0.00
|
118.56
|
M/S Wali Ahad Bhuiyan
|
118.45
|
29/12/2020
|
01/05/2021
|
12/03/2022
|
100
|
116.23
|
98
|
29/09/2022
|
|
400
|
Noakhali
|
7
|
noakhali-s
|
51
|
824
|
UIIP- BC/PCO/W-287
|
(A) Construction works of RCC drain besides of Noakhali College to Master Para Road Ch. 0.00-485m at ward no.-02 under Noakhali Pourosava.(B) Construction works of RCC drain besides of Sonapur Pouro Bazar main drain Ch. 0.00-250m & Link- 1,2,3 &4 (4x50)=200m at ward no.-02 under Noakhali Pourosava area.
|
|
|
0.00
|
0.00
|
116.32
|
M/S Maisa-Khalek JV
|
116.24
|
29/12/2020
|
01/05/2021
|
12/03/2022
|
100
|
115.56
|
99
|
29/09/2022
|
|
401
|
Noakhali
|
7
|
noakhali-s
|
51
|
824
|
UIIP- BC/PCO/W-286
|
Improvement of Joykrisna pur road (starting from Islamia road to Fakirpur Madrasha) by RCC CH. 0.00-845m at ward no. 04 under Noakhali Pourosava.
|
|
0.85
|
0.00
|
0.00
|
87.11
|
M/S Abdul khalek
|
87.06
|
28/12/2020
|
01/04/2021
|
01/03/2022
|
100
|
81.61
|
94
|
29/09/2022
|
|
402
|
Noakhali
|
7
|
noakhali-s
|
51
|
824
|
UIIP- BC/PCO/W-157
|
(A)Re construction of judge court to new judicial court to new judicial magistrate court caonnecting road by RCC ( ch -00265.00m) at ward -03 under noakhali pourashava area . Ch. 0.00-0.270(B)Re construction of chaild school road ( main road to west sode joy krisnopur road ) by RCC ( ch-00-550.00m)at ward -04 ,under noakhali pourashava area.
|
|
0.82
|
0.00
|
0.00
|
110.34
|
M/S Abdul Khalak
|
110.25
|
30/07/2020
|
06/08/2020
|
05/08/2021
|
100
|
110.24
|
100
|
29/09/2022
|
|
403
|
Noakhali
|
7
|
noakhali-s
|
51
|
824
|
UIIP- BC/PCO/W-156
|
(A)Improvement of north maijdee old collage road by RCC ch 00+650.00m at word no -03, under Noakhali pourashava Area.(B)Improvement of north maijdee borad school road ( from police line borad school ) by RCC ch 00+400.00m at word no -01, under Noakhali pourashava Area.
|
|
1.05
|
0.00
|
0.00
|
123.93
|
M/S Abdul Khalak
|
129.73
|
30/07/2020
|
06/08/2020
|
05/08/2021
|
100
|
126.34
|
98
|
29/09/2022
|
|
404
|
Noakhali
|
7
|
noakhali-s
|
51
|
824
|
UIIP- BC/PCO/W-24
|
Re construction of vobanigang road by BC (ch-00-965.00m) at ward -09, under noakhali pourashava.
|
|
0.97
|
0.00
|
0.00
|
103.34
|
M/S Osman gani
|
103.29
|
12/07/2020
|
|
18/07/2021
|
100
|
103.13
|
100
|
29/09/2022
|
|
405
|
Noakhali
|
7
|
noakhali-s
|
51
|
824
|
UIIP- BC/PCO/W-23
|
Re construction of badrul haider road by BC (ch-00-406.00m) at ward -09 ,under noakhali pourashava area.
|
|
1.41
|
0.00
|
0.00
|
114.60
|
M/D Wali Ahad Bhuiyan
|
114.39
|
27/07/2020
|
03/08/2020
|
02/08/2021
|
100
|
114.30
|
100
|
29/09/2022
|
|
406
|
Noakhali
|
7
|
noakhali-s
|
51
|
824
|
UIIP- BC/PCO/W-22
|
Re construction & widening of Hakim quarter road & DC office connecting road by BC (ch-00.00-530.00m)and (ch-00.00-130.00m)at ward -3,under nokhali pourashava area.
|
|
0.66
|
0.00
|
0.00
|
75.84
|
M/S Rupali Enterprise (JV)
|
75.84
|
27/07/2020
|
03/08/2020
|
02/08/2021
|
100
|
74.47
|
98
|
29/09/2022
|
|
407
|
Noakhali
|
7
|
noakhali-s
|
51
|
824
|
UIIP- BC/PCO/W-21
|
Improvement of fakirpur road ( from main road alipur road) by BC ch 00+1150m at word no -04, under Noakhali pourashava Area.
|
|
1.15
|
0.00
|
0.00
|
112.73
|
M/S Abdul Khalak
|
112.65
|
26/07/2020
|
02/08/2020
|
01/08/2021
|
100
|
111.97
|
99
|
29/09/2022
|
|
408
|
Pabna
|
49
|
bhangura
|
383
|
824
|
UIIP-BC/PCO/W-449
|
A) Construction of Road from Shahjahan's Pond to H/O Hasem Ch.0.00-400m by RCC work at Chowbaria Dokkhinpara Ward No-09 Under Bhangura Pourashava District: Pabna
B) Construction of Road from Mr. Mokaddes's Pond to H/O Mr. Afzal Ch.0.00-160m by RCC work at Kashipur Pourashava Ward No-06 Under Bhangura Pourashava District: Pabna
C) Rehabilitation of Road from Uttam's Shop to H/O Mojibor Chairman (Ch.0.00-280.00m) by Dense Carpeting (DC) at Saratnagar Bazar Ward No-08 Under Bhangura Pourashava District: Pabna
|
|
0.84
|
0.00
|
0.00
|
104.69
|
IBNUL-SAMIHA (JV)
|
90.40
|
27/02/2022
|
11/03/2022
|
11/03/2023
|
70
|
47.36
|
52
|
29/09/2022
|
|
409
|
Pabna
|
49
|
bhangura
|
383
|
824
|
UIIP-BC/PCO/W-448
|
A) Rehabilitation of Road from H/O Monirul to Graveyard Ch.0.00-500m by Bituminus Dense Carpeting DC at Uttar Menda Ward No-01 under Bhangura Pourashava District: Pabna.
B) Construction of Road from H/O Peal to H/O Hasinur Master by RCC Road (Ch.0.00-80m) at Kalibari Ward No-02 Under Bhangura Pourashava District: Pabna
C) Rehabilitation of Road from DC Road Bylane to DC Main road Adjacent Sarutia School & H/O Pakhi Ch.0.00-1246m by Bituminus Dense Carpeting DC at Chowbaria Moddhopara Ward No-04 Under Bhangura Pourashava
|
|
1.83
|
0.00
|
0.00
|
105.10
|
M/S Goodman Enterprise
|
86.36
|
27/02/2022
|
11/03/2022
|
11/03/2023
|
75
|
74.67
|
86
|
29/09/2022
|
|
410
|
Pabna
|
49
|
bhangura
|
383
|
824
|
UIIP-BC/PCO/W-447
|
A) Rehabilitation of Road from Akram Shop to Mouchak Cenama Hall Foot Bridge (Ch:0.00-420.00m) By Bituminous Dense Carpeting (DC) at Bhangura Bazer Ward No.-03 under Bhangura Pourashava District: Pabna.B) Rehabilitation of Road from Batajuri Mor to H/O Khorshed (Ch:0.00m-950.00m By Bituminous Dense Carpeting (DC) at Chowbaria Uttar Para Ward No.-07 under Bhangura Pourashava District: Pabna.
|
|
1.15
|
0.00
|
0.00
|
128.16
|
M/S Goodman Enterprise
|
103.83
|
27/02/2022
|
11/03/2022
|
11/03/2023
|
100
|
95.96
|
92
|
29/09/2022
|
|
411
|
Pabna
|
49
|
bhangura
|
383
|
824
|
UIIP-BC/PCO/W-319
|
A) Rehabilitation of Road from H/O Mr. Kolimuddin Sir to GSM Road Ch.0.00-150m by RCC work at BhanguraMosjidpara ward-03 under BhanguraPourashava
B) Construction of RCC Drain from (i) H/O KurbanSarder to H/O NimuCh.0-240m (ii) H/O Nimu to H/O SaifulCh.0-180m at Mosjidpara Ward-3 under BhanguraPourashava.
C) Rehabilitation of Road from Shahinur Shop to H/O ShahalomShikderCh.0-1030m by Bituminus Dense Carpeting DC at Uttar Sarutia Ward No.-04 under BhanguraPourashava.
|
|
1.18
|
0.00
|
0.00
|
126.42
|
IBNUL-SAMIHA (JV)
|
103.16
|
12/08/2021
|
11/10/2021
|
11/10/2021
|
80
|
88.29
|
85
|
29/09/2022
|
|
412
|
Pabna
|
49
|
bhangura
|
383
|
824
|
UIIP-BC/PCO/W-318
|
A) Construction of Road from Abdulpur Bazar Mor to Graveyard Culvert by RCC work Ch. 0.00-325m by RCC work at Uttar Menda ward no-01 under BhanguraPourashava.
B) Improvement of Road from Uttar Menda Main Road bylane to toward SantinagrCh.0-400m by RCC work at Uttar Menda ward no-01 under BhanguraPourashava Pabna.
C) Rehabilitation of Road from Baily Bridge to Hospital gate via Bus Stand by WBM Dense Carpeting Ch.0.00-400m at Ward No-05 under BhanguraPourashava. District: Pabna.
|
|
1.13
|
0.00
|
0.00
|
114.99
|
SAMIHA-BISHWAS (JV)
|
94.64
|
12/08/2021
|
11/10/2021
|
11/10/2022
|
70
|
72.87
|
77
|
29/09/2022
|
|
413
|
Pabna
|
49
|
bhangura
|
383
|
824
|
UIIP-BC/PCO/W-317
|
A) Construction of RCC Drain from H/O Mr. Mozibor Chairman to Haran MajiGhatCh.0.00-330m at Saratnagar Bazar ward no-08 UnderBhanguraPourashava. District: Pabna.
B) Rehabilitation of Road from H/O Mr. Mozibor Chairman to K.G School (Ch.0-95m) by Dense Carpeting (DC) at Saratnagar Bazar Ward no-8 under BhanguraPourashava. District :Pabna.
C) Contruction of RCC Drain from Bissokorma Shop to H/O Aslam (Ch.0.00-110m) at ChowbariaModdopara ward-08 Under BhanguraPourashava. District :Pabna.
D) Rehabilitation of Road from Bissokorma Shop to H/O Aslam (Ch.0.00-110m) by RCC at ChowbariaModdopara ward-08 Under BhanguraPourashava.District : Pabna.
|
|
0.21
|
0.00
|
0.00
|
113.19
|
SAMIHA-BISHWAS (JV)
|
95.64
|
12/08/2021
|
11/10/2021
|
11/10/2022
|
60
|
76.36
|
79
|
29/09/2022
|
|
414
|
Pabna
|
49
|
bhangura
|
383
|
824
|
UIIP-BC/PCO/W-316
|
A) Rehabilitation of Road from College Mor to H/O KhorshedCh.0.00-720m by Bituminus Dense Carpeting DC at ChowbariaModdhopara Ward No.-07 under BhanguraPourashava.
B) Contruction of RCC Drain from BhanguraSorotnogor Bazar Collage More to H/O Mr. Mahatab Master via H/O Mr.FoyajMolla to Sun-Bart School (Ch.0-405m) Under BhanguraPourashava District : Pabna.
C) Improvement of Road from H/O Mr. Bissonatdeb to H/O Mr. Sohidul Ch. 0.00-210m by RCC work at Bhadropara ward no-08 under BhanguraPourashava.
|
|
0.93
|
0.00
|
0.00
|
116.54
|
IBNUL-SAMIHA (JV)
|
98.48
|
12/08/2021
|
11/10/2021
|
11/10/2022
|
95
|
85.80
|
87
|
29/09/2022
|
|
415
|
Pabna
|
49
|
bhangura
|
383
|
824
|
UIIP-BC/PCO/W-92
|
(a) Improvement of Road from Maita-pool GSM Road to H/O Mr. Roj Ch.0-590m by WBM & Dense Carpeting at Dokkhin Sarutia Ward no-06 Under Bhangura Pourashava. District: Pabna (b) Improvement of Road from H/O Mr. Tojim Sir to H/O Mr. Monjur Mollah Ch.0m-515m by R.C.C Work at Chowbaria Dokkhinpara, Ward-09 under Bhangura Pourashava.
|
|
0.59
|
0.00
|
0.00
|
107.16
|
Zinnat Ali Zinnah Ltd.
|
88.67
|
05/08/2020
|
|
11/08/2021
|
100
|
88.66
|
100
|
29/09/2022
|
|
416
|
Pabna
|
49
|
bhangura
|
383
|
824
|
UIIP-BC/PCO/W-91
|
(a) Rehabilitation of Road from Bhangur Sorote Nogur Bazar Cow Hat to H/O Aslam by R.C.C Work,WBM, Dense Carpeting (Ch.00-910m) at ward no-8 under Bhangura Pourashava. District :Pabna. (b) Rehabilitation of Road from Kalibari Bazar Main Road to H/O Abdur Rahman Sornokar Ch.0-420m by Dense Carpeting (DC) at Ward No-02 Under Bhangura Pourashava. District: Pabna.
|
|
1.33
|
0.00
|
0.00
|
102.32
|
Zinnat Ali Zinnah Ltd.
|
81.60
|
05/08/2020
|
|
11/08/2021
|
100
|
81.60
|
100
|
29/09/2022
|
|
417
|
Pabna
|
49
|
chatmohar
|
344
|
824
|
UIIP/BC/PCO/W-325
|
A) Improvement of Bituminous Carpeting Road from 03 No. Ward Zero Point to Khaghat Mosque Road (Ch:0.00-870.00m) Under Chatmohar Pourashava Pabna.B) Construction of RCC Road from 04 No. Ward Kazi Para Shahi Mosque to kajipara Pond (Ch: 0.00-172.00m) Under Chatmohar Pourashava Pabna.
|
|
1.04
|
0.00
|
0.00
|
67.75
|
Zinnat Ali Zinnah Ltd.
|
52.70
|
05/07/2021
|
|
04/07/2022
|
20
|
19.80
|
38
|
29/09/2022
|
|
418
|
Pabna
|
49
|
chatmohar
|
344
|
824
|
UIIP/BC/PCO/W-324
|
A) Construction of RCC Drain from 02 No. Ward at Vadunagor Bondhon Clenick to Haran more to Janata Bank to Boral River (Ch: 0.00-458.00m ) Under Chatmohar Pourashava Pabna. (Part-1)B) Construction of RCC Drain from Baluchor Mr. Chaonsol Comisonar House to Boral River(Ch: 0.00-105.00m ) Under Chatmohar Pourashava Pabna.
|
|
|
0.00
|
0.00
|
119.92
|
STJVMC
|
99.89
|
05/07/2021
|
12/08/2021
|
04/07/2022
|
20
|
0.00
|
0
|
29/09/2022
|
|
419
|
Pabna
|
49
|
chatmohar
|
344
|
824
|
UIIP/BC/PCO/W-323
|
A) Construction of RCC Road from 08 No. Ward Baluchar Ansar House to 02 No. Ward Choto Shalikha Hanufa Eye Hospital to Haran more Akhlass Councilor House (Ch: 0.00-850.00m) Under Chatmohar Pourashava Pabna.
B) Construction of RCC Road from 05 No. Ward Chowdhury para Medicine Corner Shop to Abdus Samad House (Ch: 0.00-385.00m) Under Chatmohar Pourashava Pabna.
C) Construction of RCC Road from 03 No. Ward Baluchor Mr. Chonchol Comisonar House to Boral River (Ch: 0.00-105.00m ) Under Chatmohar Pourashava Pabna.
D) Construction of RCC Road from 03 No. Ward Baluchar Mr. Mayon Shake House to Mr. Gopal Master (Ch: 0.00-212.00m ) Under Chatmohar Pourashava Pabna.
|
|
1.55
|
0.00
|
0.00
|
174.07
|
STJVMC
|
146.00
|
05/07/2021
|
04/08/2021
|
04/07/2022
|
98
|
116.07
|
80
|
29/09/2022
|
|
420
|
Pabna
|
49
|
chatmohar
|
344
|
824
|
UIIP/BC/PCO/W-88
|
Construction of RCC Drain at Vadunagor Bondhon Clenick to Haran more to Janata Bank to Boral River ch458.00 to 916.00 m under Chatmohar Pourashava Pabna.
|
|
0.92
|
0.00
|
0.00
|
116.74
|
Zinnat Ali Zinnah Ltd
|
116.73
|
09/08/2020
|
|
18/10/2021
|
85
|
89.69
|
77
|
29/09/2022
|
|
421
|
Pabna
|
49
|
chatmohar
|
344
|
824
|
UIIP/BC/PCO/W-20
|
A) Rehabilitation of BC Road From word no 04 Narsary More to Vadu Nagor Road (ch00m – ch:0.00-535.00m) under Chatmohar Pourashavapabna.
B)Rehabilitation of BC Road at word no 04 in site of Chatmohar Upozila porishod office Boundary under Chatmohar Pourashava Pabna. (i) UNO office To TEO office (ch 0.00m-257.00m).(ii) Officer's Cloub To UNO Residence (ch: 0.00- 171.00m). (iii) Upazila Jame Mosjid To BRBB Office (ch: 0.00-105.00m). (iv)Shillpokola Acadamy To Shapla coloni (ch 00m - 101m).
C) Construction of RCC Road From 08 no ward Affrat Para Dhoshorote House to Aakul/Rontu house (ch: 0.00 – 148.00m) under Chatmohar Pourashava Pabna.
D)Rehabilitation of BC Road From Ward no 08 Affrat Para G. A Joyen Uddin School to Sentry Security office (ch:0.00m – 185.00m) Under Chatmohar Pourashava Pabna . ii ) Rehabilitation of BC Road From Shapla Cloub to Balal house (ch:0.00 -215.00m) Under Chatmohar PourashavaPabna .
E)Rehabilitation of BC Road From word no 04 Kaji para Pukur to X-Councilor Mukul house to Word no Affrat para Kaida master house (ch:0.00 -762.00m) Under Chatmohar Pourashava Pabna. ii) Rehabilitation of BC Road Link road Jabbar house to Lalon master house (Ch:0.00 – ch:142.00m) Under Chatmohar Pourashava pabna.
F)Rehabilitation of BC Road From word no 04 Kaji Para Wahab house to Dr. Anish house at Narsary Road (ch:0.00m – Ch:301.00m) Under Chatmohar Pourashava Pabna. ii ) Rehabilitation of BC Road From 04 no word Kaji Para Aanis house to Sanu house (ch:0.00- 168.00m) under Chatmohar Pourashava Pabna.
|
|
3.09
|
0.00
|
0.00
|
127.96
|
M/S Samiha Enterprise
|
121.99
|
08/09/2020
|
|
18/10/2021
|
100
|
121.99
|
100
|
29/09/2022
|
|
422
|
Pabna
|
49
|
faridpur
|
369
|
824
|
UIIP-BC/ PCO/W-516
|
A) Construction of RCC road including RCC slope protection works from Banwarinagar- Khagorbaria road to Ruldah moar- Notun Para road under Faridpur Pourashava (Ch.0.00-207m).
B) Construction of RCC road from WAPDA Bundh- Ruldah road to house of Actor Masum Aziz at Khalishadah under Faridpur Pourashava (Ch.0.00-72 m).
C) Construction of HBB road including earth filling work beside the house of Alamin at Khalishadah under Faridpur Pourashava (Ch.0.00-52m)
D) Widening of RCC road including RCC slope protection works from Faridpur Upazila Complex Gate to Upazila Parished Dormitory Gate at Banwarinagar under Faridpur Pourashava (Ch.0.00-400 m).
E) Construction of RCC drain with top slab from the House of Rahim to the canal at Khalishadah under Faridpur Pourashova Pabna (Ch.0.00-167 m).
F) Construction of single Vent RCC Box Culvert (4.0 mX2.6m) on the canal beside the House of Hafiz at Khalishadah under Faridpur Pourashava Pabna. Leanth 4.50.
G) Construction of RCC drain with top slap from the House of Masum to the main drain beside Thanapara Bus-Stand at Thanapara south under Faridpur Pourashava Pabna (Ch.0.00- 108 m)
H) Construction of RCC drain with top slab from House of Ratan Das to the drain beside the house of Shamsul at Thanapara south under Faridpur Pourashava Pabna (Ch.0.00-52 m)
|
|
0.73
|
4.50
|
0.00
|
164.57
|
Md. Zahidur Rahman, Pabna Sadar, Pabna.
|
161.70
|
12/04/2022
|
19/04/2022
|
18/04/2023
|
0
|
0.00
|
0
|
29/09/2022
|
|
423
|
Pabna
|
49
|
faridpur
|
369
|
824
|
UIIP-BC/ PCO/W-515
|
(A) Construction of RCC road including RCC slope protection works from Banwarinagar Central Zam-E-Mosque to toilet of Banwarinagar CBP High School under Faridpur Pourashava Pabna (Ch:0.00-178.00m).
(B) Construction of RCC road from main road to house of Abbas at Par-Faridpur under Faridpur Pourashava Pabna (Ch.0.00-158m).
(C) Construction of RCC road from main road to house of Younus at Kashipur under Faridpur Pourashava Pabna (Ch.0.00-128m).
(D) Construction of RCC road from main road to the land of Rashidul at Kashipur under Faridpur Pourashava Pabna (Ch.0.00-100m).
(E) Widening of RCC road including RCC slope protection works from Banwarinagar Tetul Tala moar to Banwarinagar CBP High School Gate under Faridpur Pourashava Pabna (Ch.0.00-72m).
|
|
0.64
|
0.00
|
0.00
|
148.70
|
Md. Rafiqul Islam, Sujanagar, Pabna.
|
117.75
|
20/04/2022
|
27/04/2022
|
26/04/2022
|
0
|
0.00
|
0
|
29/09/2022
|
|
424
|
Pabna
|
49
|
faridpur
|
369
|
824
|
UIIP-BC/ PCO/W-380
|
Construction of RCC drain from Nishipara culvert to Baral River under Faridpur Pourashava (ch.0.00-300 m).
|
|
|
0.00
|
0.00
|
209.03
|
M/S Hossain Enterprise
|
181.02
|
04/07/2021
|
11/07/2021
|
10/07/2022
|
73
|
66.64
|
37
|
29/09/2022
|
|
425
|
Pabna
|
49
|
faridpur
|
369
|
824
|
UIIP-BC/ PCO/W-379
|
(a) Construction of HBB road including earth filling from Shamsul Huda market to Proposed Mosque at Banwarinagar under Faridpur Pourashava (ch.0-235 m)
(b) Construction of HBB road including earth filling from h/o Shamsul Professor to h/o Bakar master at Banwarinagar under Faridpur Pourashava (ch.0-162m)
© Construction of RCC road including earth filling from h/o Kamal Pasha to h/o Shahadat at Khalishadah under Faridpur Pourashava (ch.0-107 m )
(d) Improvement and widening of BC road by Bituminous Dense Carpeting (DC) from Khalishadah WAPDA bundh to h/o Rezaul under Faridpur Pourashava (ch.0-293m)
(e) Construction of HBB road including earth filling from Khalishadah Carpeting road to the land of Torit under Faridpur Pourashava (ch.0-90 m )
f) Construction of BC road from house of Freedom Fighter Dulal to house of Lablu at Thanapara north under Faridpur Pourashava (ch.0-479 m)
(g) Construction of RCC road from Faridpur Technical & B.M College to h/o Alomgir at Banwarinagar under Faridpur Pourashava (ch.0-65 m ).
|
|
1.43
|
0.00
|
0.00
|
100.51
|
M/S Five Brothers Construction
|
100.40
|
19/09/2021
|
26/09/2021
|
25/09/2021
|
60
|
0.00
|
0
|
29/09/2022
|
|
426
|
Pabna
|
49
|
faridpur
|
369
|
824
|
UIIP-BC/ PCO/W-378
|
(a) Construction of BC road from Wapda Bundh to house of Ali at Ruldah under Faridpur Pourashava ( ch.0- 410 m)(b)Construction of BC road from Wapda Bundh to Mridhapara road at Rauthnagdhapara under Faridpur Pourashava ( ch.0-733 m).
|
|
1.14
|
0.00
|
0.00
|
79.34
|
M/S Progoti Enterprise
|
60.80
|
04/07/2021
|
11/07/2021
|
10/07/2022
|
34
|
0.00
|
0
|
29/09/2022
|
|
427
|
Pabna
|
49
|
faridpur
|
369
|
824
|
UIIP-BC/ PCO/W-315
|
Improvement of BC road by Bituminous Dense Carpeting (DC) from Sharif moar to Kashipur Govt. Primary School under Faridpur Pourashava (ch.0 - 2290 m ).
|
|
2.29
|
0.00
|
0.00
|
91.62
|
M/S Faridpur Enterprise-Sri Sushanto Kumar(JV)
|
70.45
|
28/01/2021
|
05/02/2021
|
25/06/2021
|
100
|
70.44
|
100
|
29/09/2022
|
|
428
|
Pabna
|
49
|
faridpur
|
369
|
824
|
UIIP-BC/ PCO/W-314
|
(a) Construction of RCC road from Uttar Tearpara main road at h/o Karim to WAPDA Bundh under Faridpur Pourashava (ch.0 - 359 m ).(b) Improvement of BC road by Bituminous Dense Carpeting (DC) from Banwarinagar CBP High School to Gopalnagar Bazar moar under Faridpur Pourashava (ch.0-1170 m).
|
|
1.53
|
0.00
|
0.00
|
103.26
|
FIVE BROTHERS-EHSANUL AZAM-JV
|
80.79
|
28/01/2021
|
05/02/2021
|
09/06/2021
|
100
|
80.78
|
100
|
29/09/2022
|
|
429
|
Pabna
|
49
|
faridpur
|
369
|
824
|
UIIP-BC/ PCO/W-313
|
Construction of RCC road including RCC protective works from Faridpur Upazila Complex Gate to Upazila Server Station at Banwarinagar under Faridpur Pourashava (Road= ch.0 - 250 m, RCC Protective Works= ch.153 - 423 m ).
|
|
0.25
|
0.00
|
0.00
|
108.36
|
M/S OMIO TRADERS
|
83.04
|
01/02/2021
|
08/02/2021
|
07/02/2022
|
92
|
70.93
|
86
|
29/09/2022
|
|
430
|
Pabna
|
49
|
faridpur
|
369
|
824
|
UIIP-BC/ PCO/W-312
|
(a) Construction of RCC road from Par-Faridpur Sharif moar to house of Shamser at Par-Faridpur under Faridpur Pourashava ( ch.0- 72 m).
(b) Construction of HBB road including earth filling from Par-Faridpur main road to Par-Faridpur Govt. Primary School under Faridpur Pourashava ( ch.0- 95 m).
(c) Construction of RCC road from house of Rezaul to bathing ghat at Par-Faridpur under Faridpur Pourashava ( ch. 0- 43 m).
(d) Construction of RCC road from Par-Faridpur main road at house of Helal to house of Abul at Par-Faridpur under Faridpur Pourashava ( ch.0-153 m).
(e) Construction of RCC drain with slab from Par-Faridpur main road at house of Helal to house of Abul at Par-Faridpur under Faridpur Pourashava ( ch.0- 113 m).
(f) Construction of RCC road from main road to Faridpur Poura Women's College at Par-Faridpur under Faridpur Pourashava (ch.0- 49 m ).
(g) Construction of HBB road including earth filling from house of Aynal mistry to Wapda Bundh at Rauthnagdhapara under Faridpur Pourashava ( ch.0- 215 m).
(h) Construction of HBB road including earth filling work from house of Dev Narayan to house of Ahammad Ali at South Tearpara under Faridpur Pourashava ( ch.0 - 52 m).
(I) Construction of RCC road from the main road at Rauthnagdhapara Govt. Primary School to stair ghat at Rauthnagdhapara under Faridpur Pourashava (ch.0 - 313 m ).
|
|
0.99
|
0.00
|
0.00
|
108.78
|
OMIO TRADERS-DIN AMIN (JV)
|
89.13
|
16/02/2021
|
|
22/02/2022
|
100
|
70.56
|
80
|
29/09/2022
|
|
431
|
Pabna
|
49
|
faridpur
|
369
|
824
|
UIIP-BC/ PCO/W-311
|
(a) Improvement of BC road by Bituminous Dense Carpeting from Banwarinagar- Khagorbaria road in front of Faridpur Upazila Parishad Gate to dwelling house of UNO, Faridpur, Pabna under Faridpur Pourashava (ch.0 - 207 m )
(b) Improvement of BC road by Bituminous Dense Carpeting from Faridpur Upazila Parishad main road in front of dwelling house of Upazila Parishad Chairman to Officers' Staff Quarter under Faridpur Pourashava (ch.0 - 37 m ).
(c) Construction of RCC road from Upazila Digital Centre to Upazila Programme Office, Faridpur, Pabna under Faridpur Pourashava (ch.0 - 102 m ).
(d) Construction of RCC road from Banomali Memorial Library to Upazila Sub-Register Office, Faridpur, Pabna under Faridpur Pourashava (ch.0 - 86 m ).
(e) Construction of RCC road from Upazila Sub-Register Office road to AC (Land) Office, Faridpur, Pabna under Faridpur Pourashava (ch.0 - 51 m ).
(f) Construction of RCC road from Faridpur Upazila Parishad main road in front of Upazila Ansar VDP Office to Banwarinagar Girl's High School under Faridpur Pourashava (ch.0 - 75 m ).
(g) Construction of RCC road from Banwarinagar Girl's High School road to Faridpur Upazila DPHE Office under Faridpur Pourashava (ch.0 - 31 m ).
(h) Construction of RCC road from Faridpur Upazila Parishad main road in front of dwelling house of UNO,Faridpur, Pabna to Officers' Club under Faridpur Pourashava (ch.0 - 67 m ).
(I) Construction of RCC road in front of Faridpur Upazila Dormitory and Staff Quarter at Banwarinagar under Faridpur Pourashava ( ch.0-119 m).
(j) Construction of RCC road from Banwarinagar-Khagorbaria road to Upazila Staff Quarter at Ban-wainagar under Faridpur Pourashava (ch.0-28 m).
(k) Construction of RCC road from Upazila Server Station road to h/o Freedom Fighter Abul Hashem at Ban-warinagar under Faridpur Pourashava (ch.0-75 m ).
|
|
0.80
|
0.00
|
0.00
|
90.23
|
M/S Faridpur Enterprise-Sri Sushanto Kumar(JV)
|
83.01
|
03/03/2021
|
10/03/2021
|
09/03/2022
|
100
|
74.47
|
90
|
29/09/2022
|
|
432
|
Pabna
|
49
|
faridpur
|
369
|
824
|
UIIP/BC/ PCO/W-90
|
(A) Construction of RCC road from Banwarinagar Alim Madrasa to Ruldah Wapda Bundh under Faridpur Pourashava ( ch.0- 312 m).
(B) Construction of RCC road from house of Advocate Abul Hossain to house of Abdus Sattar at Banwarinagar under Faridpur Pourashava ( ch.0- 65 m).
(C) Construction of HBB road including earth filling from house of Nuru to Wapda Bundh at Banwarinagar under Faridpur Pourashava ( ch.0- 72 m).
(D) Construction of RCC drain with RCC slab including box drain (1.0 mX1.0 mX0.200 m) from Faridpur Technical & B.M College to C
|
|
0.45
|
0.00
|
0.00
|
96.27
|
SONEX-KHALEQUE JV
|
77.11
|
09/08/2020
|
09/08/2020
|
27/10/2021
|
100
|
77.01
|
100
|
29/09/2022
|
|
433
|
Pabna
|
49
|
faridpur
|
369
|
824
|
UIIP/BC/ PCO/W-89
|
(A)Improvement and Widening of road from Thanapara culvert to Food godown moar by Bituminous Dense Carpeting (DC) under Faridpur Pourashava ( ch.0-518 m ).
(B) Construction of RCC road from Thanapara culvert to house of Krishna Councillor at Thanapara north under Faridpur Pourashava ( ch.0-93 m).
(C) Construction of RCC road from Krishna councilor’s shop to Nishipara Govt. Primary School at Nishipara under Faridpur Pourashava ( ch.0-76 m).
(D) Construction of RCC road from Thanapara main road at house of Kalimuddin to Nishipara Kalimondir under Faridpur Pourashava ( ch.0-116 m).
(E) Construction of RCC Box drain beside Nishipara Kali-mondir under Faridpur Pourashava (2.5 mX3.0 mX0.225 m). Leanth 12m.
(F) Construction of HBB road from house of Nurul Islam to house of Hafiz at Khalishadah under Faridpur Pourashava( ch.0-77 m).
|
|
0.88
|
0.00
|
0.00
|
110.08
|
SONEX-KHALEQUE JV
|
88.24
|
09/08/2020
|
09/08/2020
|
27/10/2021
|
100
|
88.22
|
100
|
29/09/2022
|
|
434
|
Patuakhali
|
1
|
bauphal
|
19
|
824
|
UIIP/PCO/G-37
|
Implementation & Supply 765 nos Waste Basket (120 ltr) & 10 nos Non-motorized vehicle (van) under Bauphal Pourashava District: Patuakhali.
|
|
|
|
1.00
|
39.97
|
RFL Plastrics Limited
|
25.26
|
|
|
|
0
|
0.00
|
0
|
08/10/2024
|
|
435
|
Patuakhali
|
1
|
bauphal
|
19
|
824
|
UIIP-BC/PCO/W-579
|
(A). Construction of RCC Road from R&H Road to Qazi Nazrul Islam Saroni Via College Mosque (ch.0.00-250.00m) at ward no-03 Under Bauphal Pourashava, Patuakhali.
(B). Improvement of Carpating Road R&H to Bauphal-Patuakhali BC Sarak Via Jommadder Bari (Janata Road) (ch.1096.00-1963.00=867.00m) at ward no-03 Under Bauphal Paurashava, Patuakhali.
"(C). Improvement of Carpating Road from MB Bridge East side slope of Bauphal -Dhandi BC Sarok ( ch.275.00 +
283 .00m+152.00m=710.00m) at ward no-08 Under Bauphal Paurashava, Patuakhali."
(D). Improvement of Carpating road from Nurul Haq Master house to Noni Mistre Bari Via Salaheya Dinia Complex Madrasha at ward no-06 (ch.0.00-470.00m) Under Bauphal Paurashava, Patuakhali.
|
|
2.30
|
|
|
274.97
|
M/S Shupty Arman-Mahabub (JV) Swapnil
|
274.78
|
05/02/2024
|
15/02/2024
|
04/02/2025
|
67
|
82.62
|
30
|
08/10/2024
|
|
436
|
Patuakhali
|
1
|
bauphal
|
19
|
824
|
UIIP-BC/PCO/W-552
|
(a). Construction of shed for public transport Passenger (28.00 spm) at Bauphal Poura Tempu Stand Near H/Q Eng. Faraque North Side od RHD Under Bauphal Pourashava, Patuakhali.
(b). Construction of single storied public Toilet (Type-A) near poraton Samaj kallan Gano Milonatan Under Bauphal Pourashava, Patuakhali
|
|
|
|
2.00
|
55.68
|
M/S Mahatab Enterprise
|
55.47
|
15/02/2024
|
25/02/2024
|
14/02/2025
|
22
|
0.00
|
0
|
08/10/2024
|
|
437
|
Patuakhali
|
1
|
bauphal
|
19
|
824
|
UIIP-BC/PCO/W-559
|
A) Improvement of BC Road from R&H road to South side of Poura end area (Sher-E-Bangla Road) in ward no. 07 ( Ch:0.00-885.00m) under Bauphal Paurashava, Patuakhali.
B) Improvement of BC Road from Shre-E-Bangla road to Md. Yousuf Sarder Bari (Bangla Link Sarak) in ward no. 06 ( Ch:0.00-500.00m) under Bauphal Pourashava, Patuakhali
C) Improvement of BC Road from R&H road to North Side Bangla Bazer Bridge under Bauphal Paurashava in ward no. 07 ( Ch:0.00-173.00m) under Bauphal Pourashava, Patuakhali
D) Construction of RCC Road from Dr. Momin Sarak to Md. Aziz Member Bari via Daspara Dakhil Madrasha in ward no. 09 ( Ch:360.00-512.00m=152.00m) and Link road of Aziz Membar Bari ( Ch:0.00-16.50m) under Bauphal Paurashava, Patuakhali .
|
|
1.73
|
|
|
127.77
|
DEEP-SAHINOOR (JV)
|
127.52
|
23/04/2023
|
30/04/2023
|
29/04/2024
|
100
|
125.49
|
100
|
08/10/2024
|
|
438
|
Patuakhali
|
1
|
bauphal
|
19
|
824
|
UIIP-BC/PCO/W-558
|
(A). Construction of RCC Road Bangla Bazer to Napter Khal Via Mohila Collage Bridge Approch end side (Mohila Collage Road) under Bauphal Paurashava in ward No-08. Ch.000-562m)
(B). Construction of RCC Road Napiter Khal Culvert road end point to Jor poll RCC Road in ward No-08. Ch.960.00-1128.00=168m).
(C).Construction of RCC Drain Md. Mahadi House Back side to South side Mrs. Rakha Begum front side via Khalil Bari at ward no.09 Under Bauphal Paurashava, Patuakhali. (Ch.000-548.00m).
|
|
0.73
|
|
|
211.26
|
M/S Arman Builders & Rupali Construction
|
211.01
|
02/02/2023
|
02/02/2023
|
01/02/2024
|
100
|
206.71
|
100
|
08/10/2024
|
|
439
|
Patuakhali
|
1
|
bauphal
|
19
|
824
|
UIIP-BC/PCO/W-428
|
A) Improvement of Carpating Sarak From R&H road to Jommader Bari (Janata Sarak) Ch.0.00-2000.00m at ward No-03 under BauphalPaurashava.
B) Construction of BC road from Muslimpara Poura Bhaban Front side to Fredom Fighter Wayadut Mia Sarak Via Basur Bari in ward No.-03 Under Bauphal Paurashava.Ch.0.00-1400.00m & With 02 Nos Box Culvert.
C) Construction of RCC Culvert on Muslimpara BC Sarak front side of Dr. Ramij Uddin Bari in ward No.-05 under Bauphal Paurashava.
D) Construction of RCC Box Culvert on Muslimpara Sarak Near Bot tola in ward No.-03 under Bauphal Paurashava. at Ch.80m.
|
|
3.40
|
5.00
|
0.00
|
190.91
|
M/S SH Etnr. & Shupty Cons.
|
208.12
|
10/02/2021
|
10/02/2021
|
09/02/2022
|
100
|
207.86
|
100
|
08/10/2024
|
|
440
|
Patuakhali
|
1
|
bauphal
|
19
|
824
|
UIIP-BC/PCO/W-427
|
A) Construction of RCC Drain front side of master Monir Existing RCC Drain to East side of Haji Golam Mostofa House under BauphalPaurashava in ward No.-08. Ch.0.00-281.00m.
B) Construction of Muslimpara RCC road from R&H Road to Pauro Bhabon at ward No.-03 under Bauphal Paurashava. Ch.0.00-492m.
C) Construction of RCC road from Sher-E-Bangla Sarak to Chan Mia House at word No.-07 under Bauphal Paurashava. Ch.0.00-64.00m.
|
|
0.56
|
0.00
|
0.00
|
147.22
|
M/S Arman Builders & Rupali Construction
|
161.52
|
23/02/2022
|
03/02/2022
|
22/02/2023
|
100
|
161.24
|
100
|
08/10/2024
|
|
441
|
Patuakhali
|
1
|
bauphal
|
19
|
824
|
UIIP-BC/PCO/W-221
|
A) Contruction of Earth filling & HBB Sarak ward no.-01 Bangabandhu Sarak to ward no.-03 al Modina Jame Mosque via Abdus Samad Jame Mosque under Bauphal Paurosava, District-Patuakhali. Ch. 0.00-1067m.
B) Contruction of RCC Road & Drain from Saha Para existing Drain to Paurosava Bhaban via Councilor Miss Rina Begum House in ward no.-03 under under Bauphal Pourosava, District-Patakhali. Ch.0.00-182m.
C). Construction of RCC Culvert front side of Md. Zakir Surveyer House ward no.-03 under Bauphal Paurosava, District-Patuakhali
|
|
1.25
|
1.00
|
0.00
|
109.72
|
Md. Abul Kalam Azad
|
108.54
|
13/12/2020
|
|
30/05/2022
|
100
|
108.31
|
100
|
08/10/2024
|
|
442
|
Patuakhali
|
1
|
bauphal
|
19
|
824
|
UIIP-BC/PCO/W-274
|
(a). Construction of RCC Digital Sarak to Fakir Bari via A Razzak Fokir, Mulai Fakir, & Athar Gazi in ward-O9, under Bauphal Pauroshava, District: Patuakhali. Ch.000-219m
(b). Construction of RCC Sarak Chairpara Existing RCC road to fredonm fighter AKM khalak mia house in ward -09, under Bauphal Pauroshava, District: Patuakhali. Ch.000-107m.
(c). Construction of RCC Sarak Nazirpur Board School Sarak to Ponchiyed Bari in ward-08, under Bauphal Pauroshava, District: Patuakhali. Ch.000-275m.
(d). Construction of RCC Sarak Nazirpur Board School to Mirda Bari in ward no-08 under Bauphal Pauroshava, District: Patuakhali. Ch.000-141m
(e). Construction of RCC Sarak Kazi Nazrul lslam Saroni Baitul Hamed lame Mosque to Gopal Sill front side Existing RCC road (Sill Para Sarak) via Madop Mondol Bari in ward-03, under Bauphal Pauroshava, District: Patuakhali. Ch.000-348m
|
|
1.09
|
0.00
|
0.00
|
127.60
|
M/S Deip Enterprise
|
127.08
|
12/04/2021
|
12/04/2021
|
11/04/2022
|
100
|
126.85
|
100
|
29/09/2022
|
|
443
|
Patuakhali
|
1
|
bauphal
|
19
|
824
|
UIIP-BC/PCO/W-273
|
(a). Construction of RCC Drain Girl School more to Kali Bari Existing Drain via Sakender pesker, Councilor Kabir, Jarnalist Shohag in ward No-04, under Bauphal Paurashava, District: Patuakhali. Ch.000-415m
(b). Construction of RCC Drain & road R&H sarak to Santh Bag Md, Balayet Kanongo Back side Existing RCC Drain via Rngr. Jafor House in ward No07, under Eauphal Paurashava, District: Patuakhali. Ch.000-177m
|
|
|
0.00
|
0.00
|
121.85
|
M/S Roza & Saom Enterprise - M/S Sawda Enterprise (JV)
|
121.14
|
12/04/2021
|
12/11/2021
|
12/04/2022
|
100
|
121.11
|
100
|
29/09/2022
|
|
444
|
Patuakhali
|
1
|
bauphal
|
19
|
824
|
UIIP-BC/PCO/W-272
|
(a). Construction of BC Sarak Noni Mistary Bari to Md. yousuf Sarder Bari in ward-06, under Bauphal Paurashava, District: Patuakhali. Ch.000-580m
(b). Construction of Hisbullah BC Sarak from yousuf Sarder Bari via Alom Sikder Bari more in ward-06, under Bauphal Paurashava, District: Patuakhali. Ch.000-314m
(c). Construction of BC Sarak from Darun Sunna Sarak to front side of sikder Bari (Bakultala Sarak) in ward-o7, under Bauphal Paurashava, District: Patuakhali. Ch.000-520m
(d). Construction of BC Sarak Dr, momin Sarak to 5ha-E-Bangla Sarak (Assai Sarak) in ward09, under Bauphal Paurashava, District: Patuakhali. Ch.000-488m.
|
|
1.90
|
0.00
|
0.00
|
106.56
|
M/s Sh Enterprise & Shupty Construction (JB)
|
105.41
|
12/04/2021
|
12/04/2021
|
11/04/2022
|
100
|
105.25
|
100
|
29/09/2022
|
|
445
|
Patuakhali
|
1
|
bauphal
|
19
|
824
|
UIIP-BC/PCO/W-222
|
Construction of RCC Road & Drain from Romijuddin Sarak to Md. Mannan Khan House ward no.-03 under Bauphal Paurosava, District Patuakhali. Ch. 0.00-475m.
|
|
0.46
|
0.00
|
0.00
|
105.21
|
Md. Jamal Hossain
|
103.64
|
13/12/2020
|
|
19/12/2021
|
100
|
103.60
|
100
|
29/09/2022
|
|
446
|
Patuakhali
|
1
|
bauphal
|
19
|
824
|
UIIP-BC/PCO/W-132
|
(A). Construction of RCC Drain Dr. Abul Kalam Farmacy front side of Bauphal khal in ward-04, under Bauphal Pauroshava, District: Patuakhali. ch.000-170m.
(B). Construction of RCC Drain Md. Sultan Ahammad House to North side of Bauphal Khal via Abdul Khalek Police, Md. Sultan Gazi, Jebon Kormokar in ward-03, under Bauphal Paurosova, District: Patuakhali ch. 000-290
|
|
|
0.00
|
0.00
|
80.62
|
Md. Iqbal Hossain
|
70.00
|
01/09/2020
|
07/09/2020
|
06/09/2021
|
100
|
69.98
|
100
|
29/09/2022
|
|
447
|
Patuakhali
|
1
|
bauphal
|
19
|
824
|
UIIP-BC/PCO/W-131
|
(a) Contruction of Earth filling & HBB Sarak…… Ch.000-670m
(b) Contruction of Earth filling & HBB Sarak…… Ch.000-396m
|
|
1.07
|
0.00
|
0.00
|
83.10
|
M/S Arman Builders
|
81.85
|
14/12/2020
|
14/12/2020
|
30/05/2022
|
100
|
81.85
|
100
|
29/09/2022
|
|
448
|
Patuakhali
|
1
|
bauphal
|
19
|
824
|
UIIP-BC/PCO/W-130
|
(a) Contruction of Earth filling & HBB Sarak…… Ch.000-518m
(b) Contruction of Earth filling & HBB Sarak……… Ch.000-548m
(c) Construction of RCC Sarak………. Ch.000-225m
|
|
1.29
|
0.00
|
0.00
|
92.79
|
M/s Hasan Construction & Shupty Construction (JB)
|
91.85
|
14/12/2020
|
14/12/2020
|
30/05/2022
|
100
|
58.43
|
63
|
29/09/2022
|
|
449
|
Patuakhali
|
1
|
kalapara
|
12
|
824
|
UIIP/PCO/G-40
|
Implementation & Supply 863 nos Waste Basket (120 ltr) & 4 nos Non-motorized vehicle (van) under Kalapara Pourashava District: Patuakhali.
|
|
|
|
1.00
|
39.98
|
RFL Plastrics Limited
|
27.43
|
08/02/2024
|
09/02/2024
|
08/06/2024
|
0
|
0.00
|
0
|
09/10/2024
|
|
450
|
Patuakhali
|
1
|
kalapara
|
12
|
824
|
UIIP-BC/PCO/W-561
|
A) Construction of RCC Road Starting from WAPDA Road to Sobahan Sikder Model Academy Road at Ward No-09 Under Kalapara Pourahava, Dist: Patuakhali (Ch. 0.00m to 189.00m)
B) (i) Construction of RCC Drain Starting from WAPDA Road Adv. Abdur Rob House via Jahangir Mridha House via Abdul Awal Shannomot to Ferdous Matubbar House at Ward No-08 Under Kalapara Pourahava, Dist: Patuakhali (Ch. 0.00m to 235.00m)
(ii) Construction of RCC Drain Starting from Kalapara Thana to Press Club at Ward No-02 Under Kalapara Pourahava, (Ch. 0.00m to 85.00m)
|
|
0.19
|
|
|
105.66
|
AT_JAKIR
|
104.96
|
18/07/2023
|
25/07/2023
|
25/07/2024
|
100
|
91.90
|
100
|
09/10/2024
|
|
451
|
Patuakhali
|
1
|
kalapara
|
12
|
824
|
UIIP-BC/PCO/W-560
|
Construction of Road by RCC, Starting from RHD Road to Sayed Uddin Super Market via Dak-Bangla Road via Sheikh Kamal Auditorium via Mohila College at Ward No-01 & 02 Under Kalapara Pourahava, Dist: Patuakhali (Ch. 0.00m to 215.00m & 363.00m to 906.00m) Total Length- 758.00m
|
|
0.76
|
|
|
134.05
|
MD. Kamal Hossain
|
133.57
|
18/07/2023
|
25/07/2023
|
23/04/2024
|
100
|
133.35
|
100
|
09/10/2024
|
|
452
|
Patuakhali
|
1
|
kalapara
|
12
|
824
|
UIIP-BC/PCO/W-567
|
Improvement of BC Road from Fery Ghat Chowrasta to Shantibagh Road at Ward No: 01, 02 & 06 Under Kalapara Pourashava , District: Patuakhali(Ch. 0.00-1000m)
|
|
1.00
|
|
|
92.44
|
MZH-ST (JV)
|
92.37
|
02/08/2023
|
09/08/2023
|
01/08/2024
|
100
|
92.33
|
100
|
09/10/2024
|
|
453
|
Patuakhali
|
1
|
kalapara
|
12
|
824
|
UIIP-BC/PCO/W-538
|
Construction of Parks and Playgrounds under Kalapara Pourashava. Dist. Patuakhali, (Boundary Wall -117.000m , Surface Drain -131.40m , Footpath-131.40, Gate-02no, Ticket Conner -01no , Food Coner -01 no, Toilet-01 no and Bench-15Nos).
|
|
|
|
1.00
|
124.01
|
M/S Mahmud Kamal, South Sabujbagh, Patuakhali
|
99.94
|
14/09/2022
|
21/09/2022
|
13/09/2023
|
100
|
98.22
|
100
|
09/10/2024
|
|
454
|
Patuakhali
|
1
|
kalapara
|
12
|
824
|
UIIP-BC/PCO/W-528
|
A) Construction of Shed for Public Transport Passenger (28.00sqm) at ward No.01 Under Kalapara's Pourashava.
B) Construction of One Storied Public Toilet (Type A=56.00sqm) at ward No.02 Under Kalapara's Pourashava.
C) Construction of One Storied Vegetables & Agricultural Product Market of 5 Storied Foundation (Floor Area=314 sqm) at ward No.02 Under Kalapara's Pourashava.
|
|
|
0.00
|
3.00
|
198.83
|
ATC-KCD (JV)
|
167.23
|
07/07/2022
|
13/07/2022
|
12/07/2023
|
100
|
162.42
|
100
|
09/10/2024
|
|
455
|
Patuakhali
|
1
|
kalapara
|
12
|
824
|
UIIP/PCO/G-38
|
Implementation & Supply 500 nos Waste Basket (120 ltr) & 25 nos Non-motorized vehicle (van) under Kuakata Pourashava District: Patuakhali.
|
|
|
|
1.00
|
39.09
|
RFL Plastrics Limited
|
30.00
|
|
|
|
0
|
0.00
|
0
|
08/10/2024
|
|
456
|
Patuakhali
|
1
|
kalapara
|
12
|
824
|
UIIP-BC/PCO/W-522
|
A) Construction of Shed for Public Transport Passenger (28.00sqm) at Kuakata Bus Terminal Front Side Under Kuakata Pourashava.
B) Construction of One Storied Public Toilet (Type A=56.00sqm) at North Panjupara, ward No.08 Under Kuakata Pourashava.
|
|
|
|
2.00
|
47.33
|
M/S Mamun Construction
|
44.59
|
16/11/2022
|
23/11/2022
|
15/11/2023
|
100
|
35.40
|
79
|
08/10/2024
|
|
457
|
Patuakhali
|
1
|
kalapara
|
12
|
824
|
UIIP-BC/PCO/W-521
|
A) Improvement of BC Road from Nilonjona Road (Faraje Bari Mosque) to Anchar Camp (Very Bandth) (Ch:0.00-265.00m) Ward No.-07, Under Kuakata Pourashava, Kalapara, Patuakhali.
B) Construction of 01 Nos X-Culvert (Size 1.35mX1.80m) of BC Road from Nilonjona Road (Faraje Bari Mosque) to Anchar Camp (Very Bandth) at Ch:180m, Ward No.-07, Under Kuakata Pourashava, Kalapara, Patuakhali.(dropped)
C) Improvement of Earthen Road by BC from Mala Para 02 No. Ward BC Road To Sorifpur Primary School West side 01 No. Ward BC Road, (via Habib Soref house), (Ch:0.00-290.00m), Ward No-01, Under Kuakata Pourashava, Kalapara, Patuakhali.
D) Construction of 01-Vent RCC Box Culvert (Size: 2.00m x2.50m) of Mala Para 02 No. Ward BC Road To Sorifpur Primary School West side 01 No. Ward BC Road, (via Habib Soref house) at Ch:150m, Ward No -01, Under Kuakata Pourashava, Kalapara, Patuakhali.
E) Construction of RCC Drain starting from 07 No Ward Rakin Market Field No LGED Training Center (Councilor Asraf Sikder House Front Road Side), (Ch.0.00-200.00m), Ward No.-07, Under Kuakata Pourashava, Kalapara, Patuakhali.
|
|
0.67
|
2.00
|
|
150.38
|
M/S Najmus Shahadat Traders, Patuakhali
|
142.04
|
16/11/2022
|
23/11/2022
|
31/05/2024
|
100
|
125.50
|
88
|
08/10/2024
|
|
458
|
Patuakhali
|
1
|
kalapara
|
12
|
824
|
UIIP-BC/PCO/W-400
|
A) Construction of RCC Box Culvert (2x4.00mx3.00m) near at Taher Khan Jame Mosque in Asriaon Ward No. 04, Under Kalapara's/ Kuakata Pourashava.
B) Construction of RCC Box Culvert (1x4.30mx3.00m) near at Mr.Kalam & Mr. Afjal house Side Nabinpur Khal in Word No-06, Under Kalapara's/ Kuakata Pourashava.
|
|
|
8.30
|
0.00
|
71.64
|
M/S Bakshi Enterprise
|
60.58
|
03/03/2021
|
04/03/2021
|
05/03/2022
|
100
|
60.22
|
100
|
08/10/2024
|
|
459
|
Patuakhali
|
1
|
kalapara
|
12
|
824
|
UIIP-BC/PCO/W-399
|
Construction of RCC Drain Work Starting from 03 no. Ward Main BC Road (LGED Rest House West Side) to Shohed Nurujjaman Sorok, (Via Elish Park), Under Kalapara's/ Kuakata Pourashava. (Ch-0+000-0+985.00m)
|
|
|
0.00
|
0.00
|
177.42
|
M/S Libati Traders & Rezwanul Masud (JV)
|
141.40
|
03/03/2022
|
08/03/2022
|
07/03/2023
|
100
|
113.11
|
80
|
08/10/2024
|
|
460
|
Patuakhali
|
1
|
kalapara
|
12
|
824
|
UIIP-BC/PCO/W-398
|
A) Construction of RCC Drain Work starting from 80 Ghare Area, Ward No.01, Under Kalapara's/ Kuakata Pourashava. (Ch:0+000-0+572.00m)
|
|
|
0.00
|
0.00
|
51.90
|
M/S Mayer Doya Enterprise
|
43.59
|
03/03/2022
|
08/03/2022
|
07/03/2023
|
100
|
43.54
|
100
|
08/10/2024
|
|
461
|
Patuakhali
|
1
|
kalapara
|
12
|
824
|
UIIP-BC/PCO/W-397
|
Construction of RCC Road Starting From 03 no. ward Main BC Road (LGED Rest House West Side) to Shohed Nurujjaman Sorok (Via Elish Park).Ward No-07, Under Kalapara's/ Kuakata Pourashava. (Ch.0+000-0+380m)
|
|
0.38
|
0.00
|
0.00
|
104.09
|
Rezwanul Maksud
|
87.88
|
03/03/2022
|
08/03/2022
|
30/04/2024
|
100
|
83.46
|
100
|
08/10/2024
|
|
462
|
Patuakhali
|
1
|
kalapara
|
12
|
824
|
UIIP-BC/PCO/W-396
|
Improvement of Earthen Road by the BC from the House of Jabber Chawdary’s Culvert to Wapda Very Bandth at ward No-01, Under Kalapara's/ Kuakata Pourashava. (Ch-1+300m-1+965m)
|
|
0.67
|
0.00
|
0.00
|
114.18
|
M/S Delowar Hossain
|
97.94
|
03/03/2022
|
08/03/2022
|
07/03/2023
|
100
|
97.72
|
100
|
08/10/2024
|
|
463
|
Patuakhali
|
1
|
kalapara
|
12
|
824
|
UIIP-BC/PCO/W-172
|
1. Improvement of Soling & Earthen Road by the BC from Monir Shorif house to Asrayan 03 Three Road More Ch.000m0730m730.00m at Ward No-03 Under Kalapara's/ Kuakata Pourashav Patuakhali.
2. Construction of 01 One Nos of 1-Vent RCC Box Culvart
2.00m x2.50m at Ch-390m Under Kalapara's/ Kuakata Pourashava
Patuakhali
|
|
0.73
|
2.00
|
0.00
|
137.31
|
M/S Palli Store
|
131.14
|
05/01/2021
|
05/01/2021
|
31/05/2024
|
100
|
129.09
|
100
|
08/10/2024
|
|
464
|
Patuakhali
|
1
|
kalapara
|
12
|
824
|
UIIP-BC/PCO/W-171
|
1.Improvement of Earthen Road by the BC from the house of
Jabber Chawdarys Culvert to Wapda Very Bandth Ch.690m - Ch. 1300m = 610 m at Ward No -01 Under Kalapara's/ Kuakata Pourashava Patuakhali.
2.Construction of UIIP/BC/PCO/W-17201one Nos of 1-Vent RCC Box Culvart 1.50m x1.80mat Ch-1085.00m at Ward No -01 Under Kalapara's/ Kuakata Pourashava Patuakhali.
3. Construction of 01one Nos X-Drain 0.750x1.80m at Ch1147.00m Ward No -01 Under Kalapara's/ Kuakata Pourashava.
|
|
0.61
|
1.50
|
0.00
|
124.65
|
M/S Palli Store
|
110.21
|
05/01/2021
|
05/01/2021
|
31/05/2024
|
100
|
109.07
|
100
|
08/10/2024
|
|
465
|
Patuakhali
|
1
|
kalapara
|
12
|
824
|
UIIP-BC/PCO/W-170
|
1 Improvement of Earthen Road by the BC from Rahman Kha Mosque To Culvert of Rustum Musully Ch.00 m-690m at Ward No-01 Under Kalapara's/ Kuakata Pourashava. Patuakhali.
2. Construction of 01one Nos of 1-Vent RCC Box Culvart 1.50m x1.80m at Ch- 690m at Ward No -01 Under Kalapara's/ Kuakata Pourashava Patuakhali
|
|
0.69
|
1.50
|
0.00
|
125.73
|
M/S Palli Store
|
111.54
|
05/01/2021
|
05/01/2021
|
31/05/2024
|
100
|
110.09
|
100
|
08/10/2024
|
|
466
|
Patuakhali
|
1
|
kalapara
|
12
|
824
|
UIIP-BC/PCO/W-18
|
Improvement of Soling & Earthen Road by the BC from Toyeb Member house to Mahabub Talukder Sarak Ch.0+00m0+520m = 520.00m at Ward No-08 Under Kalapara's/ Kuakata Pourashava Patuakhali. (Salvage Cost Tk.103664.00)
|
|
0.52
|
0.00
|
0.00
|
85.80
|
M/S Palli Store
|
83.47
|
01/10/2020
|
07/10/2020
|
31/05/2024
|
100
|
73.87
|
100
|
08/10/2024
|
|
467
|
Patuakhali
|
1
|
kalapara
|
12
|
824
|
UIIP-BC/PCO/W-455
|
A) Construction of RCC 01 ( one) Vent Box Culvert ( 5m x4m x3m) over Kalibari road west side near Yeasin mia House at ward no-01 under Kalapara's Pourashava.
B) Construction of RCC 01 ( one) Vent Box Culvert ( 5m x4m x3m) over Nachnapara Khal near Suny Cottage at ward No.-01 under Kalapara's Pourashava.
C) Construction of RCC 03 ( Three) Vent Box Culvert( 7.55m x3.70m x3m) over Natun Bazar Canal (Atimkhana) near Yosuf mia House at ward No-04 under Kalapara's Pourashava.
D) Construction of RCC Box Culvert (7.8m x 1.5m x 2.4m) Over Chinguria road at ward No.-05 under Kalapara's Pourashava
|
|
|
20.00
|
0.00
|
89.80
|
M/S Rupali Construction
|
73.32
|
25/01/2022
|
01/02/2022
|
30/01/2023
|
100
|
73.02
|
100
|
29/09/2022
|
|
468
|
Patuakhali
|
1
|
kalapara
|
12
|
824
|
UIIP-BC/PCO/W-454
|
Construction of RCC drain Starting from Baitul Aman Jame Masjid via Nazrul Islam Sarak to Chinguria road at ward No.-04 under Kalapara's Pourashava.Ch.0.00 to 300m.
|
|
|
0.00
|
0.00
|
63.35
|
M/S Antora Trading co
|
53.36
|
25/01/2022
|
01/02/2022
|
30/01/2023
|
10
|
0.00
|
0
|
29/09/2022
|
|
469
|
Patuakhali
|
1
|
kalapara
|
12
|
824
|
UIIP-BC/PCO/W-453
|
Construction of Rigid Pavement from Chinguria via Pourashava Office to Rahmat Pur Road at ward no-04 & 05 under Kalapara's Pourashava. Ch.0.00m to 1500m.
|
|
1.50
|
0.00
|
0.00
|
204.22
|
M/S Rupali Construction
|
166.17
|
31/01/2022
|
07/02/2021
|
30/01/2023
|
100
|
166.05
|
100
|
29/09/2022
|
|
470
|
Patuakhali
|
1
|
kalapara
|
12
|
824
|
UIIP-BC/PCO/W-271
|
(a)Construction of RCC Drain starting from Upazila Hospital via Ad, chunnu Mia house to Old Drain at ward no. 01 under Kalapara's Pourosava. Ch. 0+500m.
(a)Construction of RCC Drain starting from Madrasa Roadvia Mofij Mia house to Naseria Senior Madrasa at ward no. 07 under Kalapara's Pourosava. Ch. 0+280m.
|
|
|
0.00
|
0.00
|
133.81
|
Md. Kamal Hossain
|
115.92
|
10/01/2021
|
11/01/2021
|
09/01/2022
|
100
|
115.65
|
100
|
29/09/2022
|
|
471
|
Patuakhali
|
1
|
kalapara
|
12
|
824
|
UIIP-BC/PCO/W-270
|
(a)Construction of RCC Drain starting from Kartik Babu house to Bollov Kormokar house at ward no. 05 under Kalapara's Pourosava. Ch. 0+250m.
(b) Construction of RCC Drain starting from west side of Nur Mohammad Sharif house via Jahirul Islam house, Narayon Shill house to Rahmatpur Khal at ward no. 03 under Kalapara's Pourosava. Ch. 0+152m.
(c)Construction of RCC Drain starting from Shamir Pal house to Nimai Sarker house at ward no. 06 under Kalapara's Pourosava. Ch. 0+100m.
|
|
|
0.00
|
0.00
|
91.70
|
Md. Kamal Hossain
|
78.89
|
10/01/2021
|
11/01/2021
|
09/01/2022
|
100
|
78.88
|
100
|
29/09/2022
|
|
472
|
Patuakhali
|
1
|
kalapara
|
12
|
824
|
UIIP-BC/PCO/W-269
|
(a) Improvement of road by Rigid Pavement starting from Ukil Patti road via Kacha Bazar to WAPDA road at ward no.-02 under Kalapara's Pourosava. Ch. 0+500m.
(b) Construction of RCC Road starting from Razzak Khan house via Girls School to Kabi Nazrul Islam Road at ward no. 04 under Kalapara's Pourosava. Ch. 0+330m.
|
|
0.50
|
0.00
|
0.00
|
109.84
|
Md. Kamal Hossain
|
91.76
|
10/01/2021
|
11/01/2021
|
09/01/2022
|
100
|
91.60
|
100
|
29/09/2022
|
|
473
|
Patuakhali
|
1
|
kalapara
|
12
|
824
|
UIIP-BC/PCO/W-268
|
(a) Construction of RCC Road starting from WAPDA Road to Dak Bangla at ward no.-02 under Kalapara's Pourosava. Ch. 0+150m
(b) Improvement of road by RCC work from WAPDA Road via Hamid Munshi house to Kumar Patti road at ward no.-06 under Kalapara's Pourosava. Ch. 0+150m.
(c) Improvement of road by RCC work from East side of Sukh ranjan house to Rakha Chandi Khola at ward no.-05 under Kalapara's Pourosava. Ch. 0+150m.
(d) Improvement of road by RCC work in Golab Bagh road at ward no.-03 under Kalapara's Pourosava. Ch. 0+200m.
(e) Construction of RCC Road starting from Kabi Nazrul Islam Road via Army Khalek Mia house to Razzak Miah House at ward no.-03 under Kalapara's Pourosava. Ch. 0+120m
|
|
0.77
|
0.00
|
0.00
|
97.11
|
ATC_ NUR, Puran Bazar, Patuakhali
|
81.00
|
10/01/2021
|
11/01/2021
|
09/01/2022
|
100
|
80.89
|
100
|
29/09/2022
|
|
474
|
Patuakhali
|
1
|
kalapara
|
12
|
824
|
UIIP-BC/PCO/W-267
|
(a) (A) Implementation of Road by RCC work from WAODA road Boro Callbari via Kallbari Box Culvert to Fire Service road at ward no- 01 under Kalapara's Pourosava. Ch. 0+000 to 0+930m
|
|
0.93
|
0.00
|
0.00
|
113.12
|
M/S Rupali Construction & Rup Store JV
|
92.93
|
10/01/2021
|
11/01/2021
|
09/01/2022
|
100
|
92.86
|
100
|
29/09/2022
|
|
475
|
Patuakhali
|
1
|
kalapara
|
12
|
824
|
UIIP-BC/PCO/W-94
|
(a) Improvement of RCC road starting from behind Girls school to Adom Ali Master house at ward No.-04 Under Kalapara's Pourashava. Ch. 0.00-230.00m
(b) Improvement of RCC road starting from Kumar Potti road via Naya potti Oilmill Mosjid at ward No.-06 Under Kalapara's Pourashava. Ch. 0.00-240.00m.
(c) Improvement of RCC road starting from Pizus Kanti house via Kishor Vender house to Kobi Nazrul Islam road at ward No.-03 Under Kalapara's Pourashava. Ch. 0.00-340.00m.
(d) Construction of road by rigid pavement from Uttam Karmoker house via Akhrabari to Vojohori Kundo at ward No.-06 Under Kalapara's Pourashava. Ch. 0.00-320.00m.
|
|
1.13
|
0.00
|
0.00
|
98.24
|
M/S Bokshi Enterprise
|
87.82
|
08/09/2020
|
15/09/2020
|
20/09/2021
|
100
|
87.81
|
100
|
29/09/2022
|
|
476
|
Patuakhali
|
1
|
kalapara
|
12
|
824
|
UIIP-BC/PCO/W-93
|
(a) Improvement of road by rigid pavement from Madrasha road via Altaf Mia house to Rafique mia house at ward No.-07 under Kalapara's Pourashava. Ch. 0.00 to 640.00m.
(b) Improvement of road by rigid pavement starting from west side Nur-E Jame Masjed Nesaria Sarak to Sohel Mia house at ward No.-09 under Kalapara's Pourashava. Ch. 0.00 to 513.00m.
|
|
1.15
|
0.00
|
0.00
|
146.81
|
M/S TM Enterprise
|
125.98
|
22/09/2020
|
29/09/2020
|
28/09/2021
|
100
|
86.29
|
68
|
29/09/2022
|
|
477
|
Patuakhali
|
1
|
kalapara
|
12
|
824
|
UIIP-BC/PCO/W-19
|
1) Improvement of Earthen Road by the BC from Panju Para More To End of Pourashava Area Ch. 2+000m-2+760m = 760m at Ward No-08. Under Kalapara's/ Kuakata Pourashava.Patuakhali.
2) Construction of 01 One No of 1-Vent RCC Box Culvert 1.50mx1.80m Ch.2+00m-2+300m at Ward No-08 Under Kalapara's/ Kuakata Pourashava Patuakhali
|
|
0.76
|
1.50
|
0.00
|
148.31
|
M/S Mamun Construction
|
131.53
|
01/10/2020
|
07/10/2020
|
17/12/2021
|
100
|
89.73
|
68
|
29/09/2022
|
|
478
|
Patuakhali
|
1
|
patuakhali-s
|
14
|
824
|
UIIP/PCO/G-39
|
Implementation & Supply 358 nos Waste Basket (120 ltr) & 35 nos Non-motorized vehicle (van) under Patuakhali Pourashava District: Patuakhali.
|
|
|
|
|
40.00
|
|
0.00
|
|
|
|
0
|
0.00
|
0
|
09/10/2024
|
|
479
|
Patuakhali
|
1
|
patuakhali-s
|
14
|
824
|
UIIP-BC/PCO/W-534
|
A) Construction of Shed for Public Transport Passenger at 4 Lane Road Circuit House South Side of Patuakhali Pourashava
B) Construction of Shed for Public Transport Passenger at 4 Lane Road Sonali Bank South Side of Patuakhali Pourashava
C) Construction of Single Storied Public Toilet Building (Type A) at 4 Lane Road Circuit House South Side of Patuakhali Pourashava
|
|
|
|
3.00
|
69.48
|
M/S Jui Enterprise
|
69.35
|
14/02/2024
|
23/02/2024
|
13/02/2025
|
19
|
0.00
|
0
|
09/10/2024
|
|
480
|
Patuakhali
|
1
|
patuakhali-s
|
14
|
824
|
UIIP-BC/PCO/W-562
|
A) Construction of RCC Road starting fromAd, Aziz house to Shimulbag Shahadat house in Ward No.03 of Patuakhali Pourashava (Ch: 0.00-260m) and Link Road (Ch : 0.00-110m & Ch:0.00-90.00m).
" B) Construction of RCC Drain Starting from Ad, Aziz
house to Shimulbag Shahadat house in Ward No,03
of Patuakhali Pourashava (Ch: 0.00-260.00m) and Link
drain (Ch:0-200.00m). "
" C) Construction of RCC Road from Town Joinkati Main
Road to Bagan Bari Road (New Salim Mia Zamia Mosque)
at Ward No : 01 of Patuakhali Pourashava
(Ch: 0.00-145.00m). "
" D) Construction of RCC Drain Starting from Sonali Bank
Turning to Tax Office & 01 No. Cross Drain at Ward
No. 08 of Patuakhali Pourashava (Ch: 0.00-275.00m) "
|
|
0.61
|
|
|
304.61
|
Gazi Al-Mamun-Ayan (JV)
|
319.48
|
28/03/2023
|
03/04/2023
|
27/03/2024
|
85
|
208.47
|
65
|
09/10/2024
|
|
481
|
Patuakhali
|
1
|
patuakhali-s
|
14
|
824
|
UIIP-BC/PCO/W-450
|
Construction of RCC Drain with footpath at Sabujbag main road from Govt. College Gate-2 to Boy's Hostel with top slab of existing drain in ward No.-04 of Patuakhali Pourashava. (Ch:0.00-500.00m)
|
|
|
0.00
|
0.00
|
191.45
|
M/S Jakaullah & Brothers-M/S Ayan Entr.
|
206.36
|
23/02/2022
|
28/02/2022
|
22/02/2023
|
88
|
149.05
|
72
|
09/10/2024
|
|
482
|
Patuakhali
|
1
|
patuakhali-s
|
14
|
824
|
UIIP-BC/PCO/W-220
|
1) Improvement of Road at Middle Kolatola Sarok Maik Gazi house to Poura BC road (Via Aziz gazi house), ch 0.00-780.0m, Word No-09, Under Patuakhali Pourashava.
2) Construction of 1 Nos Nox Culvert at Middle Kolatola Sarok Manik gazi house to Poura BC road (Via Aziz gazi house), ch 0.00-330.0m, Word No-09, Under Patuakhali Pourashava.
3) Construction of 2 nos Cross Drain (1.00x1.25x10m) at Middle Kolatola Sarok Maik Gazi house to Poura BC road (Via Aziz gazi house), ch 0.00-780.0m, Word No-09, Under Patuakhali Pourashava.
4) Construction of 5 nos 450m Dia UPVC Pipe wit Inlet Pit at Middle Kolatola Sarok Maik Gazi house to Poura BC road (Via Aziz gazi house), ch 0.00-780.0m, Word No-09, Under Patuakhali Pourashava.
|
|
0.78
|
5.00
|
0.00
|
135.01
|
Md. Mizanur Alam
|
146.41
|
13/12/2020
|
03/01/2021
|
01/03/2022
|
100
|
165.11
|
100
|
09/10/2024
|
|
483
|
Patuakhali
|
1
|
patuakhali-s
|
14
|
824
|
UIIP-BC/PCO/W-112
|
1 Improvement of Road at Chowrasta Mirzagong Sarak Mosque to South Side Polli Bidut Main Highway Ch 0.00-660.0m Under Patuakhali Pourashava.2 Construction of 5 nos Cross Drain 1.00x1.25x8m on Rigid Pavement at Chowrasta Mirzagong Sarak Mosque to South Side Polli Bidut Main Highway Under Patuakhali Pourashava.
|
|
0.66
|
0.00
|
0.00
|
190.17
|
Md. Mizanur Alam
|
193.85
|
23/09/2020
|
|
07/12/2021
|
100
|
192.77
|
100
|
09/10/2024
|
|
484
|
Patuakhali
|
1
|
patuakhali-s
|
14
|
824
|
UIIP-BC/PCO/W-111
|
1 Improvement of Road at Town Kalikapur Amtoly Main Sarok to West Side Gudigata Sarok Via 93 no Govt. Primary School Ch 0.00-450.0 m WordNo-09 Under Patuakhali Pourashava.
2 Improvement of Road at Town Kalikapur 93 no Govt. Primary School to North Side Md. Abu bakor Munci Goni Munci and Ali Munci house Ch0.00-350.0mWord No-09 Under Patuakhali Pourashava.
3 Construction of 5 nos 450m Dia UPVC Pipe wit Inlet Pit at Town Kalikapur 93 no Govt. Primary School to North Side Md. Abu bakor Munci Goni Munci and Ali Munci house Ch0.00-350.0mWord No-09 Under Patuakhali Pourashava.
|
|
0.80
|
0.00
|
0.00
|
145.74
|
M/S Kohinoor Enterprise
|
142.56
|
01/04/2020
|
07/04/2020
|
06/04/2020
|
100
|
142.55
|
100
|
09/10/2024
|
|
485
|
Patuakhali
|
1
|
patuakhali-s
|
14
|
824
|
UIIP-BC/PCO/W-219
|
1 Improvement of Road at Puran Feery Ghat Main Road to South Side Mirzagong Main Road Muktizodda SarokCh 0.00-760.0 m Under Patuakhali Pourashava
|
|
0.76
|
0.00
|
0.00
|
108.55
|
Md. Mizanur Alam
|
138.75
|
28/02/2021
|
03/01/2021
|
28/02/2022
|
100
|
138.74
|
100
|
29/09/2022
|
|
486
|
Patuakhali
|
1
|
patuakhali-s
|
14
|
824
|
UIIP-BC/PCO/W-218
|
1. Improvement of Road at Nondokanai- Mirzagong Main Road to North Side Akusha Sarok ( Ch0.00-435.0m) in Ward No-09 Under Patuakhali Pourashava.
|
|
0.44
|
0.00
|
0.00
|
78.06
|
Md. Mizanur Alam
|
109.86
|
28/02/2021
|
03/01/2021
|
28/02/2022
|
100
|
109.86
|
100
|
29/09/2022
|
|
487
|
Pirojpur
|
3
|
bhandaria
|
35
|
824
|
UIIP/PCO/G-41
|
Implementation & Supply 439 nos Waste Basket (120 ltr) & 30 nos Non-motorized vehicle (van) under Bhandaria Pourashava District: Pirojpur.
|
|
|
|
|
39.98
|
RFL Plastrics Limited
|
0.00
|
|
|
|
0
|
0.00
|
0
|
09/10/2024
|
|
488
|
Pirojpur
|
3
|
bhandaria
|
35
|
824
|
UIIP-BC/PCO/W-517
|
A) Construction of Shed for Public Transport Passenger (28.00sqm) Beside Bottola Bus Stand at ward No.01 Under Bhandaria Pourashava.
B) Construction of One Storied Public Toilet (Type A=56.00sqm) at Bhandaria Bazer Supari Potti, ward No.03 Under Bhandaria Pourashava.
C) Construction of One Storied Vegetables & Agricultural Product Market of 5 Storied Foundation (Floor Area=314 sqm) Beside Ex-UP Complex Bhaban Bhandaria Bazer, ward No.03 Under Bhandaria Pourashava.
|
|
|
0.00
|
3.00
|
201.72
|
M/S Tuhin Enterprise
|
201.54
|
06/08/2022
|
|
07/06/2023
|
100
|
200.00
|
100
|
09/10/2024
|
|
489
|
Pirojpur
|
3
|
bhandaria
|
35
|
824
|
UIIP-BC/PCO/W-407
|
A) Rehabilitation of Road by Bituminous Carpeting Starting from Bottola ( Bhandaria Barishal R&H Road) to Lakshmipura GPS Via Lakshmipura Gagibari ( Ch.0.00m-780.00m) under Bhandaria Pourashava, Pirojpur.
B) Construction of RCC Road from Freedom fighter Bhabon to Sahida Akter House & Bhandaria Bazar to Kolema Chattar Road, Link Road Rustom Ali House (Ch-0.00-156.00m Link-0.00-58.00m & Link -0.00-20.00m) at ward No-03, under Bhandaria Pourashava, pirojpur.
C) Construction of RCC Drain from Freedom fighter Bhabon to Sahida Akter House & Bhandaria Bazar to Kolema Chattar Road (Ch-0.00-201.00m) at ward No-03, under Bhandaria Pourashava, pirojpur.
D) Construction of RCC Road from Bhandaria to Vani Road to Shikder & Jomadder House to Pona River ( Ch. 0.00- 780.00m ) in ward No-09 Under Bhandaria Pourashava, Pirojpur.
E) Construction of RCC Box Culvert (2x4.00 X 3.600m) near at Motin Sorkar House front Cannel in ward No-09 Under Bhandaria Pourashava, Pirojpur.
F) Construction of RCC road from Bhandaria to Vani Road (Eidgha) to Pona River ( Ch. 0.00- 400.00 m ) in ward No-07 Under Bhandaria Pourashava, Pirojpur.
G) Construction of RCC Road from Siddek Bishas House to 107 No Gazipur Government Primary School to Mintu Sarkar house ( Ch. 00- 670.00 m ) in ward No-09 Under Bhandaria Pourashava, Pirojpur.
H) Construction of RCC Road from Bhandaria Vani Road (Boro Kanua Goverment Pond) to Pona River Road ( Ch. 0.00- 670.00 m ) in ward No-08 Under Bhandaria Pourashava, Pirojpur.
|
|
3.51
|
4.00
|
0.00
|
418.73
|
M/S Rupali Construction,Hospital road,Barishal
|
392.11
|
19/06/2022
|
26/06/2022
|
18/06/2023
|
92
|
330.09
|
84
|
09/10/2024
|
|
490
|
Pirojpur
|
3
|
bhandaria
|
35
|
824
|
UIIP-BC/PCO/W-254
|
A)Construction of RCC Road With Guide Wall from Bhandariavani road ( Ali shop) BoroKanua High School Back side (Ch-0.00-550.00) m at Ward No-08Under BhandariaPourahava Pirojpur.
B) Construction of RCC Drain on LakiJomdder House to Bubonasher Khal (Ch-0.00-180.00)m in Ward No-03 Under BhandariaPourahava Pirojpur.
|
|
0.55
|
0.00
|
0.00
|
190.17
|
M/S Kayed Builders
|
190.17
|
23/01/2022
|
|
29/01/2023
|
100
|
97.97
|
100
|
09/10/2024
|
|
491
|
Pirojpur
|
3
|
bhandaria
|
35
|
824
|
UIIP-BC/PCO/W-253
|
Construction of RCC Drain with cover slab from R & H road (Vartaoffice) to Jomadder House at ch-0.00-420.00m at Ward No-03Under BhandariaPourahava. Pirojpur
|
|
0.42
|
0.00
|
0.00
|
107.20
|
M/S Luna Enterprise
|
107.10
|
01/06/2022
|
06/06/2022
|
31/05/2023
|
100
|
107.10
|
100
|
09/10/2024
|
|
492
|
Pirojpur
|
3
|
bhandaria
|
35
|
824
|
UIIP-BC/PCO/W-69
|
A) Construction of RCC Road With Guide Wall from LGED Road to Babul Khondokar House (ch-0.00-280.00)m and Box-Culvert (2.00X2.00)m at (ch-0.00-18.00)m on Babul Khaondokar House ront Khal in Ward No-05,Under Bhandaria Pourashava,Pirojpur.
B)(i) Construction of RCC Box Culvert (4.00X3.600)m From Bhandaria-Vani Road west site of Shikder & Jomadder House at Ward No-09,Under Bhandaria Pourashava Pirojpur.(ii) Construction of RCC Box culvert (4.00X3.600)m at Yeashin Molla House Madrasha Front Canel in Ward No-04, Under Bhandaria Pourashava,Pirojpur.
|
|
0.28
|
8.00
|
0.00
|
99.48
|
M/S Ramisha Enterprise
|
93.55
|
06/05/2021
|
06/05/2021
|
16/07/2022
|
100
|
93.53
|
100
|
09/10/2024
|
|
493
|
Pirojpur
|
3
|
bhandaria
|
35
|
824
|
UIIP-BC/PCO/W-129
|
A) Estimate for Construction of RCC Road With Guide Wall from Piklu Sha house to Khan Bare (ch-0.00-287.00) m at Ward No-01,Under Bhandaria Pourshava, Pirojpur.
B) Estimate for Construction of RCC Drain from Govt College Road (East Side)- Chowdhury Para in Ward No-02, Under Bhandaria Pourashava, Pirojpur.
C) Estitmate for Construction of RCC Road With Guide Wall from Bhandaria-Barishal R&H road south near Siddeq master house in Ward No-01, (ch-0.00-239.00)m, Under Bhandaria Pourshava,Pirojpur
|
|
0.53
|
0.00
|
0.00
|
120.19
|
M/S Oshi Construction
|
115.91
|
12/10/2020
|
|
16/07/2022
|
100
|
89.64
|
77
|
29/09/2022
|
|
494
|
Pirojpur
|
3
|
bhandaria
|
35
|
824
|
UIIP-BC/PCO/W-128
|
A) Estimate for Construction of RCC Road With Guide Wall from Vhari School road to Vp Kamal (ch-0.00-100.00)m at Ward No-08,Under Bhandaria Pourashava,Pirojpur
B) Estimate for Construction of RCC Road With Guide Wall From Bhandaria Vani Road Mafajel Sorder House (ch-0.00-340.00) m at Ward No-08, Under Bhandaria Pourashava,Pirojpur
C) Estitmate for Construction of RCC Road With Guide Wall from food Goodawn back side Malli khall bridge (ch-0.00-700.00)m at Ward No-02,Under Bhandaria Pourashava,Pirojpur.
|
|
1.14
|
0.00
|
0.00
|
109.26
|
M/S Oshi Construction
|
102.51
|
12/10/2020
|
|
05/12/2021
|
100
|
95.81
|
93
|
29/09/2022
|
|
495
|
Pirojpur
|
3
|
bhandaria
|
35
|
824
|
UIIP-BC/PCO/W-68
|
A) Construction of RCC Road With Guide Wall from Old Zell Khana back side old CC road to freedom fighter Dadon Ali Bishas house Bottola Collage road (ch-0.00-300.00)m at Ward No-01,Under Bhandaria Pourashava,Pirojpur
B) Construction of RCC Road With Guide Wall From Bottola Collage road (shopon Shikder) House via Shikder Bari to vihari Bari School (ch-0.00-278.00)m at Ward No-01, Under Bhandaria Pourshava, Pirojpur.
C) Construction of RCC Road With Guide Wall from Vehari School Road to Lotif Shikder & Heron Munshi House (ch-0.00-189.00)m at Ward No-01,Under Bhandaria Pourashava,Pirojpur.D)Improvement Of BC Road From Abdur Hai Shakder House To Bhandaria Pourashava Boundary (ch-0.00-370.00)m at ward No-06,Under Bhandaria Pourashava,Pirojpur.
|
|
1.14
|
0.00
|
0.00
|
93.27
|
M/S Ramisha Enterprise
|
87.51
|
06/05/2021
|
06/05/2021
|
05/05/2022
|
100
|
87.51
|
100
|
29/09/2022
|
|
496
|
Rajbari
|
29
|
pangsha
|
223
|
824
|
UIIP/PCO/G-59
|
Implementation & Supply 798 nos Waste Basket (120 ltr) & 8 nos Non-motorized vehicle (van) under Pangsha Pourashava District: Rajbari.
|
|
|
|
1.00
|
39.99
|
RFL Plastics LTD
|
29.98
|
|
|
|
50
|
15.00
|
50
|
05/11/2024
|
|
497
|
Rajbari
|
29
|
pangsha
|
223
|
824
|
UIIP-BC/PCO/W-590/1
|
Improvement of RCC Road from Bagdoli road to Nurislam house via Mondal Bari Mosque under Pangsha pourashava, Rajbari (Ch.00m-ch.710m )
|
|
|
|
|
103.94
|
|
0.00
|
|
|
|
0
|
0.00
|
0
|
05/11/2024
|
|
498
|
Rajbari
|
29
|
pangsha
|
223
|
824
|
UIIP-BC/PCO/W-590
|
A. Improvement of RCC Road from Moukuri GPS to Bindu house via Sahid shop to Chondina river under Pangsha pourashava, Rajbari Ch.00-900m ( Salvage=53,708.00) B. Construction of Public Transport Passenger shed (28.00sqm) at Borogasi Bus Stand in ward no-09 under Pangsha Pourashava, Dist.: Rajbari
|
|
|
|
|
137.58
|
|
0.00
|
|
|
|
0
|
0.00
|
0
|
05/11/2024
|
|
499
|
Rajbari
|
29
|
pangsha
|
223
|
824
|
UIIP-BC/PCO/W-610
|
(A) Improvement of RCC Road from Monsi bari Mosque to bishas para mosque, Via Ashok mor Under Pangsha Pourashava, Pangsha, Rajbari. Ch.10 90.00m.
(B) Improvement of RCC Road from Aziz BDR house to Masum brick fild, Link Rafik Okil house, Under Pangsha Pourashava, Pangsha, Rajbari. Ch.800.00m. (Total Salvage Amount for Package=8,11,104.00)
|
|
1.89
|
|
|
236.79
|
JAKAULLAH & BROTHERS LTD
|
259.88
|
11/09/2023
|
18/09/2023
|
11/06/2024
|
45
|
76.63
|
29
|
05/11/2024
|
|
500
|
Rajbari
|
29
|
pangsha
|
223
|
824
|
UIIP-BC/PCO/W-530
|
Improvement of BC Road from Pangsha Thana Road to Kashem House via Pangsha Mohila College at word No : 07 under Pangsha Paurashava, Dist: Rajbari, (Ch.0.00-930.00m)
|
|
0.93
|
|
|
93.48
|
M/S Hasib Enterprise
|
79.22
|
04/09/2022
|
07/09/2022
|
03/09/2023
|
100
|
79.22
|
100
|
05/11/2024
|
|
501
|
Rajbari
|
29
|
pangsha
|
223
|
824
|
UIIP-BC/PCO/W-529
|
A. Construction of RCC Road fromGodhibari Basara Primary School to Godhibari Mosque (Yeakub Ali Biddapit road )Ch 0.00-500.00 m word no-03.under Pangsha Paurashava Pangsha Rajbari.
B. Estimate for construction of RCC X drain in Yeakub Ali Biddapit Road at Ch 0.00-200.00 & Ch 450.00 m word no-06 under Pangsha Paurashava ,Pangsha Rajbari
|
|
0.50
|
|
|
66.82
|
M/S Mayami Enterprise
|
59.95
|
11/09/2022
|
18/09/2022
|
10/09/2023
|
100
|
56.30
|
100
|
05/11/2024
|
|
502
|
Rajbari
|
29
|
pangsha
|
223
|
824
|
UIIP-BC/PCO/W-389
|
Construction of RCC Drain from Myshaala Primari School to Dhaka Road Bridge via Jahuril house eard No.08 (Ch 0.00-430.00 m) under Pangsha Pourashava Pangsha Rajbari.
|
|
0.43
|
0.00
|
0.00
|
91.40
|
M/S Rupali Construction
|
83.85
|
22/02/2022
|
27/02/2022
|
23/02/2023
|
100
|
91.37
|
100
|
05/11/2024
|
|
503
|
Rajbari
|
29
|
pangsha
|
223
|
824
|
UIIP-BC/PCO/W-388
|
(A). improvement of B.C road at Pangsha Tempu stand to old Taj Cenama holl (Ch 0.00- 500.00 m) ,word no. 06 ,under Pangsha Paurashava ,Rajbari .(B ).improvement of B.C road at Pangsha sub-rejestar office to Collage road (anup datto road ) (Ch 0.00- 410.00 m) ,word no. 04 ,under Pangsha Paurashava ,Rajbari .(C). improvement of B.C road at Pangsha Langol Bad road to Roghonathpur abdul salam house (Ch 0.00- 482.00 m) ,word no. 09 ,under Pangsha Paurashava ,Rajbari .
|
|
1.39
|
0.00
|
0.00
|
91.35
|
M/S Rupali Construction
|
85.53
|
15/06/2022
|
21/06/2022
|
14/05/2023
|
100
|
91.30
|
100
|
05/11/2024
|
|
504
|
Rajbari
|
29
|
pangsha
|
223
|
824
|
UIIP-BC/PCO/W-387
|
Construction of RCC road from Magoradingee Advokat Shoid House to Tota meya house and link Moksad house( Ch.00-850.00) Word No-07 Under Pangsha Pourashava Pangsha Rajbari
|
|
0.85
|
0.00
|
0.00
|
102.54
|
M/S Rupali Construction
|
94.07
|
22/02/2022
|
|
23/02/2023
|
100
|
102.53
|
100
|
05/11/2024
|
|
505
|
Rajbari
|
29
|
pangsha
|
223
|
824
|
UIIP-BC/PCO/W-386
|
Construction of RCC Road from Yeakub aali biddapit to Dol Vita (Ch 0.00-290.00 m) word No.03 under Pangsha Pourashava Pangsha Rajbari.A. Construction of RCC Road from Naryan pur Shokur Bissess house to Jenna Bissess house (Ch 0.00-370.00 m) word No.07 under Pangsha Pourashava Pangsha Rajbari.
|
|
0.29
|
0.00
|
0.00
|
65.89
|
M/S Rupali Construction
|
60.45
|
22/02/2022
|
27/02/2022
|
23/02/2023
|
100
|
65.89
|
100
|
05/11/2024
|
|
506
|
Rajbari
|
29
|
pangsha
|
223
|
824
|
UIIP-BC/PCO/W-322
|
A) Estimate for construction of RCC Road from Myshala Nemtola to Dhaka road link Kamarpara road under Pangsha Pourashava word no-08 Pangsha Rajbari.Ch.0.00-700.00mB) Estimate for construction of RCC Road at Narayanpur Collage road to Feroj house under Pangsha Pourash ava word no-06 Pangsha Rajbari.Ch.0.00-120.00m
|
|
0.82
|
0.00
|
0.00
|
115.43
|
M/S Lorin Enterprise
|
107.19
|
13/04/2021
|
15/04/2021
|
14/04/2021
|
100
|
107.19
|
100
|
05/11/2024
|
|
507
|
Rajbari
|
29
|
pangsha
|
223
|
824
|
UIIP-BC/PCO/W-320
|
Estimate for construction of RCC Drain from Narayanpur Shokur Bissess house to Moddho Para Mosque vai Kalu Bissess and Jinna Bissess house Under Pangsha Pourashava word no-07 Pangsha Rajbari.Ch.00.00-1000.00 m.
|
|
|
0.00
|
0.00
|
204.65
|
M/S Jakaullah & Brothers
|
190.99
|
29/04/2021
|
04/05/2021
|
05/05/2022
|
100
|
189.71
|
100
|
05/11/2024
|
|
508
|
Rajbari
|
29
|
pangsha
|
223
|
824
|
UIIP-BC/PCO/W-321
|
Estimate for RCC road at old rall line to Khobir Chairman house via Shoko house under Pangsha Pourashava word no-07 Pangsha Rajbari.Ch.00.00-1100.00 m.
|
|
1.11
|
0.00
|
0.00
|
122.64
|
M/S Lorin Enterprise
|
113.88
|
26/04/2021
|
|
28/04/2022
|
100
|
113.59
|
100
|
29/09/2022
|
|
509
|
Rajbari
|
29
|
pangsha
|
223
|
824
|
UIIP-BC/PCO/W-85
|
A. Etimate for extention RCC road in college road to Khalukhali Upozila road Ch.00m-510m under Pangsha porusova word no 05. District Rajbari. B. Esimate for rcc road myshala nimtola to Dr. Shrerdoto houise ch. 00m-280 m UnderPangsha word no: 08District Rajbari
|
|
0.79
|
0.00
|
0.00
|
97.21
|
M/S Uttam Kumar
|
97.20
|
26/11/2020
|
|
28/11/2021
|
100
|
95.89
|
99
|
29/09/2022
|
|
510
|
Rajbari
|
29
|
pangsha
|
223
|
824
|
UIIP-BC/PCO/W-84
|
Estimate for Re-Construction of RCC road from Dhaka road to Electric sub Station at Pangsha Pourashava Word no-06 Pangsha Rajbari.Ch.830.00 m.
|
|
0.83
|
0.00
|
0.00
|
100.18
|
MD.Abul Kasem Soroar
|
94.95
|
29/04/2021
|
05/04/2021
|
05/05/2022
|
100
|
94.81
|
100
|
29/09/2022
|
|
511
|
Rajshahi
|
48
|
bagha
|
360
|
824
|
UIIP-BC/PCO/W-495
|
A) Construction of Shed for Public Transport Passenger (28.00sqm) at Bagha New Bus Terminal Ward No.01 Under Bagha Pourashava Rajshahi.
B) Construction of One Storied Public Toilet (Type A=56.00sqm) at Bagha Upazilla Health Complex Ward No.07 Under Bagha Pourashava Rajshahi.
C) Construction of One Storied Vegetables & Agricultural Products Market of 5 Storied Foundation (Floor Area=314 sqm) at Bagha Hat Area Ward No.01 Under Bagha Pourashava Rajshahi.
|
|
|
0.00
|
3.00
|
150.52
|
Liton Traders & M/S Mamun Traders (JV)
|
141.64
|
26/06/2022
|
01/07/2022
|
30/06/2023
|
20
|
0.00
|
0
|
29/09/2022
|
|
512
|
Rajshahi
|
48
|
bagha
|
360
|
824
|
UIIP-BC/PCO/W-413
|
(A)Improvement of Road with RCC from Pakuria BC Road To H/O Shohidul Islam at Pakuria Ward No-02 Under Bagha Pourashava Bagha Rajshah. Ch.( 0+000 - 0+ 460)m.
(B)Rehabilitation of BC road from Sorokghat Pakuria BC road near at Mr.Serajul Islam House to Mr. Mazdar Dofader House at kaligram word no-03 under Bagha pourashava Bagha Rajshahi Ch:(0+090-0+810)m.
(C)Rehabilitation of BC road from Murshidpur Kheya Ghat to Narayonpur Bazar GC road at ward no-04 05 & 09 Under Bagha Pourashava Bagha Rajshahi. Ch.(0+000 - 1+500)m.
(D)Rehabilitation and widening of BC road from Bagha-Arani main road to Nischintapur Jame mosque at word no- 07 Under Bagha Pourashava Bagha Rajshahi Ch:(0+000-0+570)m.
(E)Improvement of road with BC from Bagha lalpur main road near Bottola to land of Mr.Chanda to South Milikbagha at word no-08 Under Bagha PourashavaBagha Rajshahi Ch:(0+000-0+402)m.
(F)Rehabilitation of BC road from Mr.Sakandor Ali House to Mr. Abdur Razzaq house near at Monmohon Primary school at word no-09 Under Bagha Pourashava Bagha Rajshahi Ch:(0+000-0+440)m.
|
|
4.18
|
0.00
|
0.00
|
229.09
|
MM Development Engineering LTD.
|
187.23
|
02/03/2022
|
10/03/2022
|
09/03/2023
|
10
|
0.00
|
0
|
29/09/2022
|
|
513
|
Rajshahi
|
48
|
bagha
|
360
|
824
|
UIIP-BC/PCO/W-412
|
Construction of RCC drain from Mr. Rafique house to Existing Box Culvert and toward Padma River side at South Gaonpara at Ward No-05 Under Bagha Pourashava Bagha Rajshahi Ch: (0+000 - 0+577)m.
|
|
|
0.00
|
0.00
|
77.71
|
MM Development Engineering LTD.
|
62.10
|
02/03/2022
|
02/03/2022
|
09/03/2022
|
0
|
0.00
|
0
|
29/09/2022
|
|
514
|
Rajshahi
|
48
|
bagha
|
360
|
824
|
UIIP-BC/PCO/W-411
|
Improvement of Road with BC from Bagha Brack office to at Hat Bolihar Government Primary School road at Bolihar ward no-1 Under Bagha Pourashava Bagha Rajshahi.
|
|
1.32
|
0.00
|
0.00
|
95.67
|
M/S Shammy Enterprise
|
76.95
|
02/03/2022
|
10/03/2022
|
09/03/2023
|
15
|
0.00
|
0
|
29/09/2022
|
|
515
|
Rajshahi
|
48
|
bagha
|
360
|
824
|
UIIP-BC/PCO/W-165
|
Construction of RCC Road from Mr. Anarul Islam house to Mr. Abdul Mannan house at Pakuria at ward no.02 under Bagha Pourashava, Bagha, Rajshahi. Ch:(0+000-0+640)m.
|
|
0.64
|
0.00
|
0.00
|
68.30
|
M/S Hossain
|
49.52
|
07/12/2020
|
|
13/12/2021
|
100
|
49.52
|
100
|
29/09/2022
|
|
516
|
Rajshahi
|
48
|
bagha
|
360
|
824
|
UIIP-BC/PCO/W-164
|
Improvement of Road with BC from Bagha-Arani BC Road to Bolihar more BC Road at Ward No: 06 & 01 Under Bagha Pourashava, Bagha, Rajshahi. Ch: (0+000-1+200)m.
|
|
1.20
|
0.00
|
0.00
|
95.65
|
M/S Hossain
|
77.95
|
07/12/2020
|
|
13/12/2021
|
100
|
77.95
|
100
|
29/09/2022
|
|
517
|
Rajshahi
|
48
|
bagha
|
360
|
824
|
UIIP-BC/PCO/W-163
|
(A)iConstruction of Road with BC from Mr.Mokbul Hossain house to Mr.Kamal Mondal house at Jotsayesta& From Mr. Abul Hossain house to Musidpur Dakkinpara Jame Mosque at Musidpur at Ward no.09 under Bagha Pourashava, Bagha,Rajshahi. Ch: (0+000-0+600)m& Ch: (0+000-0+100)m.
(ii) Construction of RCC Road crossing drain at Ch: (0+350)m.
(B) Construction of RCC drain near at Bottoly old drain forward east along Bagha-Lalpur Highway road at Baniapara at Ch:(0+000-0+120)m at ward No.08 under Bagha Pourashava, Bagha, Rajshahi.
(C) Construction of RCC drain near at Mr.Mahabul house at Kaligram Westpara at Ch:(0+000-0+030)m & near at Mr.Akram Ali house at Kaligram Kazipara at Ch:(0+000-0+030)m at ward No.03 under Bagha Pourashava, Bagha, Rajshahi.
|
|
0.70
|
0.00
|
0.00
|
77.15
|
M/S Hossain
|
60.57
|
03/12/2020
|
20/12/2020
|
09/12/2021
|
95
|
46.96
|
78
|
29/09/2022
|
|
518
|
Rajshahi
|
48
|
bagha
|
360
|
824
|
UIIP-BC/PCO/W-162
|
(A) Construction of BC Road at Bagha Upazila Healh Complex at Uttor Milikbagha at ward No.07 under Bagha Pourashava, Bagha, Rajshahi. Ch:(0+000-0+210)m.
(B) Construction of RCC Road from Mr.Shahidul Islam house to Mr.Mokbul hossain house,Baniapara Graveyeard, Caigary Pond to Late Kader Master house at Baniapara at ward No.08 under Bagha Pourashava, Bagha, Rajshahi. Ch:(0+000-0+470)m.
(C) Construction of Road by BC from Mr.Karim house to Sree Assini Shah house at Pakuria Shahpara at ward no.02 under Bagha Pourashava, Bagha,Rajshahi. Ch: (0+000-0+400)m.
|
|
1.08
|
0.00
|
0.00
|
74.51
|
M/S Hossain
|
60.73
|
03/12/2020
|
20/12/2020
|
09/12/2021
|
100
|
56.47
|
93
|
29/09/2022
|
|
519
|
Rajshahi
|
48
|
bagha
|
360
|
824
|
UIIP-BC/PCO/W-143
|
(A) Construction of BC road from Mr.Shafi house via BaliharJame Mosque & Mr. Hasem Ali house to Mr. Ainal Ali house at Balihar at ward No.01 under BaghaPourashava. Ch:(0+000-0+360)m.
(B) Construction of R.C.C Palisading workat Mr.Tozammel Haque pond side at South Gaonpara at ward no.05 under BaghaPourashava, Bagha,Rajshahi.Ch: (0+000-120)m.
(C) Construction of road with B.C from BaghaUpazila Election office to BaghaUpazila Police station gate at ward no.06 under BaghaPourashava.Bagha,Rajshahi. Ch: (0+000-0+205)m.
(D) Construction of R.C.C coverd drain from Mr.Mominul Islam Mill house via Mr. Hossain Ali house to Mr.Masud shop at UttorMilikbagha at ward no.07 under BaghaPourashava, Bagha,Rajshahi.Ch: (0+000-0+300)m.
|
|
0.69
|
0.00
|
0.00
|
82.34
|
Fariva Auto
|
81.51
|
27/09/2020
|
08/10/2020
|
07/10/2021
|
100
|
73.35
|
90
|
29/09/2022
|
|
520
|
Rajshahi
|
48
|
bagha
|
360
|
824
|
UIIP-BC/PCO/W-100
|
(A)iConstruction of RCC road from Sree Sunil house to Mr. Kalim Uddin house at Hat Balihar at ward No.1 under Bagha Pourashava. (Ch 0+000-0+240)m.(ii) Construction of RCC Palisading work at (Ch 0+030-0+100)m, (Ch 0+110-0+170)m, (Ch 0+190-0+220)m.B) Construction of BC road from Mr Akkal Ali House via Mr. Moser Ali house to Malitapara Jame Mosque road & Mr. Mahabub house road Malitapara & Mr. Mozir Uddin house road at Karigorpara at ward No. 02 under Bagha Pourashava.(Ch 0+000-0+544)m.
|
|
0.78
|
0.00
|
0.00
|
69.70
|
Fariva Auto
|
69.00
|
27/09/2020
|
08/10/2020
|
07/10/2021
|
100
|
68.06
|
98
|
29/09/2022
|
|
521
|
Rajshahi
|
48
|
bagha
|
360
|
824
|
UIIP-BC/PCO/W-99
|
(A)iConstruction of RCC drain from Mr.Tozammel Haque Pond via Mr. Abu Hossain house to Mr.Motaleb Ali house at South Gaonpara at ward no.05 under Bagha Pourashava Rajshahi. (Ch 0+000-0+260)m. (ii) Road crossing drain at (Ch 0+060)m & (Ch 0+215)m.(B)i Construction of RCC road from Mr.Bokul house to Mr. Altaf Ali house at Chalk- Ahammedpur at ward No.06 under Bagha Pourashava (Ch 0+000-0+600)m.(ii) Construction of RCC Palisading work at (Ch 0+455-0+520)m.(iii) Construction of road crossing drain at(Ch 0+210)m & (Ch 0+485)m.
|
|
0.85
|
0.00
|
0.00
|
105.99
|
Fariva Auto
|
104.93
|
27/09/2020
|
08/10/2020
|
07/10/2021
|
95
|
96.18
|
92
|
29/09/2022
|
|
522
|
Rajshahi
|
48
|
bagha
|
360
|
824
|
UIIP-BC/PCO/W-98
|
(A)i Construction of RCC road from Mr. Bikom Master house to Mr. Muku house at Kaligram at ward No.03 under Bagha Pourashava.(Ch 0+075-0+345)m.
(ii) Construction of RCC Palisading work at (Ch 0+285-0+310)m.
(B) Construction of RCC road near at Doctor Sree Mithun house at Ghospara& from Sarakghat-Pakuria BC road to Kalidaskhali High School & Primary School road at Kaligram at ward No.03 under Bagha Pourashava. (Ch 0+000-0+100)m. & (Ch 0+000-0+150)m.
(C) Rehabilitation of BC road from Sree Bhobash Pandey house to Dairitola Jame Mosque at Chalk-Narayanpur at ward no.04 under Bagha Pourashava, Rajshahi. Ch:(0+000-0+555)m.
(D) Construction of RCC drain from Mr. Dulal Professor house to Dairitola Jame Mosque at Chalk-Narayanpur at ward no.04 under Bagha Pourashava, Rajshahi.(Ch 0+000-0+330)m.
|
|
1.08
|
0.00
|
0.00
|
101.65
|
Fariva Auto
|
100.63
|
27/09/2020
|
08/10/2020
|
07/10/2021
|
100
|
100.49
|
100
|
29/09/2022
|
|
523
|
Rajshahi
|
48
|
bagha
|
360
|
824
|
UIIP-BC/PCO/W-296
|
Construction of Rcc Box Culvert Ward no 01-09 Under Arani Pourashava,Bagha ,Rajshahi
|
|
|
2.61
|
0.00
|
85.07
|
Bashundra House Builder
|
63.64
|
07/03/2022
|
08/03/2022
|
07/03/2023
|
30
|
0.00
|
0
|
29/09/2022
|
|
524
|
Rajshahi
|
48
|
bagha
|
360
|
824
|
UIIP-BC/PCO/W-295
|
Rehabilitation & Widening of station road & In side of arani Bazer ch 000-2750 ward no 04,06 Under Arani Pourashava,Bagha,Rajshahi
|
|
2.75
|
0.00
|
0.00
|
187.11
|
Bashundra House Builder
|
137.24
|
07/03/2022
|
08/03/2022
|
07/03/2023
|
90
|
108.86
|
80
|
29/09/2022
|
|
525
|
Rajshahi
|
48
|
bagha
|
360
|
824
|
UIIP-BC/PCO/W-294
|
1 Construction of B/C Road i) In Kusabari from h/o Jillu to Jamnagar Ghat & j/o Nuruzzaman Ch.000-0920. ii )From Kusabari Main Road near Eid Ghah to h/o Yousuf Ch. 000-0250. iii) In Shahpur from Main Road to h/o Rahman Shah Ch.000- 0600 ward no. 01 05 under Arani Pourshava Bagha Rajshahi.
|
|
1.77
|
0.00
|
0.00
|
121.63
|
Bashundra House Builder
|
93.94
|
07/03/2022
|
08/03/2022
|
07/03/2023
|
80
|
66.50
|
71
|
29/09/2022
|
|
526
|
Rajshahi
|
48
|
bagmara
|
364
|
824
|
UIIP-BC/PCO/W-344
|
Construction Box Culvert on Mothurapur Khal Near Younus house at word no 04 under Taherpur Pourashava, Rajshahi.
|
|
|
3.00
|
0.00
|
31.15
|
Md. Anwar Hosain, Bisupara
|
31.00
|
31/05/2021
|
07/06/2021
|
30/05/2022
|
100
|
30.99
|
100
|
29/09/2022
|
|
527
|
Rajshahi
|
48
|
bagmara
|
364
|
824
|
UIIP-BC/PCO/W-343
|
Construction of Rcc road from Mothurapur Idris House to Pabnapara Road & front of Hafiz Master house (ch.00-570m) under Taherpur Pourashava, Rajshahi.
|
|
0.57
|
0.00
|
0.00
|
71.98
|
Md. Mamunur Rashid Khan
|
71.62
|
31/05/2021
|
07/06/2021
|
30/05/2022
|
100
|
71.62
|
100
|
29/09/2022
|
|
528
|
Rajshahi
|
48
|
bagmara
|
364
|
824
|
UIIP-BC/PCO/W-342
|
Extention & Re Construction of Dense Carpeting road with Retaining wall from Jamgram Korim shop to Gaidoa Mosque (ch.00-2100m) under Taherpur Pourashava, Rajshahi.
|
|
2.10
|
0.00
|
0.00
|
160.21
|
Md. Anwar Hosain,
|
159.57
|
31/05/2021
|
07/06/2021
|
30/05/2022
|
100
|
159.39
|
100
|
29/09/2022
|
|
529
|
Rajshahi
|
48
|
bagmara
|
364
|
824
|
UIIP-BC/PCO/W-341
|
Construction of Rcc road with Retaining wall front of Basiapara Mosque, Palisading Basiapara Ibrahim Pond (Ch 00-75m) under Taherpur Pourashava, Rajshahi.
|
|
0.08
|
0.00
|
0.00
|
33.46
|
M/S Rifath Enterprise
|
33.29
|
31/05/2021
|
07/06/2021
|
30/05/2022
|
100
|
33.19
|
100
|
29/09/2022
|
|
530
|
Rajshahi
|
48
|
bagmara
|
364
|
824
|
UIIP-BC/PCO/W-340
|
Construction of Rcc Retaining wall & pointing road Front of Poura Tohsil Office Pond to high school mosque(ch140-240m). under Taherpur Pourashava, Rajshahi.
|
|
0.10
|
0.00
|
0.00
|
65.13
|
M/S Rifath Enterprise, Md. Rafiqul Islam Pk
|
64.93
|
31/05/2021
|
07/06/2021
|
30/05/2022
|
100
|
64.92
|
100
|
29/09/2022
|
|
531
|
Rajshahi
|
48
|
bagmara
|
364
|
824
|
UIIP-BC/PCO/W-339
|
Construction of Rcc Covered Drain from Chokirpara Moajjem shek house to Main Drain (ch.00-130m) under Taherpur Pourashava, Rajshahi.
|
|
0.13
|
0.00
|
0.00
|
29.88
|
Md. Abu Bakkar Mridha Munsur
|
29.76
|
08/04/2021
|
|
07/04/2022
|
100
|
29.76
|
100
|
29/09/2022
|
|
532
|
Rajshahi
|
48
|
bagmara
|
364
|
824
|
UIIP-BC/PCO/W-338
|
Construction of Rcc road with drain from Poura Auditorium to Main road near Police Fari Ch 00-250m under Taherpur Pourashava, Rajshahi.
|
|
0.25
|
0.00
|
0.00
|
58.33
|
Md. Abu Bakkar Mridha Munsur
|
58.07
|
08/04/2021
|
|
07/04/2022
|
100
|
58.07
|
100
|
29/09/2022
|
|
533
|
Rajshahi
|
48
|
bagmara
|
364
|
824
|
UIIP-BC/PCO/W-213
|
a) Re-Construction of Rcc road from Koalipara Primary School to Rosulpur Mosque under Taherpur Pourashava (ch.00-600). B)Construction of Rcc road from Nurpur Rhaman more to Patketola more (ch 00-950m) under Taherpur Pourashava, Rajshahi.
|
|
0.60
|
0.00
|
0.00
|
155.13
|
M/S Mishad International
|
154.55
|
16/08/2020
|
|
23/08/2021
|
100
|
154.53
|
100
|
29/09/2022
|
|
534
|
Rajshahi
|
48
|
bagmara
|
364
|
824
|
UIIP-BC/PCO/W-212
|
a)Construction of Rcc Road from Chankhali Bridge to mohongonj main road, under Taherpur Pourashava, (ch00-850m).b)Construction of Rcc road from Poura Auditorium to Mohongonj main road via Mohila collage under Taherpur Pourashava, (ch 00-1000m)
|
|
1.85
|
0.00
|
0.00
|
172.02
|
M/S Mishad International
|
171.62
|
16/08/2020
|
|
23/08/2021
|
100
|
171.62
|
100
|
29/09/2022
|
|
535
|
Rajshahi
|
48
|
bagmara
|
364
|
824
|
UIIP-BC/PCO/W-47
|
Construction of Rcc Retaining wall & road Front of Poura Tohsil Office to high school mosque under Taherpur Pourashava, Rajshahi.
|
|
0.14
|
0.00
|
0.00
|
64.76
|
Md. Mamunur Rashid Khan
|
67.60
|
16/07/2020
|
|
22/07/2021
|
100
|
67.55
|
100
|
29/09/2022
|
|
536
|
Rajshahi
|
48
|
bagmara
|
364
|
824
|
UIIP-BC/PCO/W-46
|
(A) Construction of Rcc Covered drain from LGED Godawn to River via Piaz hata mosque under Taherpur Pourashava, (ch220-440m).(B) Construction of 9 Nos Rcc road from-
(a) Jamgram mosque to Bahar house, (ch. 00-325m)
(b) RosulpurSefatulla house to Akkas house,(ch. 00-270)
(c) Amtoli Mosque to Sohel house, (ch.00-m160)
(d) Front of Munsur house, (ch. 00-50m)
(e) RosulpurRoidul house to Salam house, (ch.00-130)
(f) Side of Jomuna Shoe room, (ch.00-130)
(g) Front of JalaparaMondir(ch.00-145)
(h) JamloiLalu house to Somser house.ch.(00-150)
(i) BisuparaSohidkhondokar main rode ch. (00-180
|
|
1.49
|
0.00
|
0.00
|
163.79
|
Md. Abu Bakkar Mridha Munsur
|
170.63
|
16/07/2020
|
|
22/07/2021
|
100
|
170.63
|
100
|
29/09/2022
|
|
537
|
Rajshahi
|
48
|
bagmara
|
364
|
824
|
UIIP-BC/PCO/W-45
|
(A) Construction of Rcc Covered drain from Horitola more to LGED Godown under Taherpur Pourashava, (ch00-220m).
(B) Re-Construction of Dens carpeting road with Retaining wall from Dighipara Babul house to Hejatipara Mojnu house, (ch. 00-1500m).
|
|
1.50
|
0.00
|
0.00
|
142.99
|
M/S Rifath Enterprise
|
151.97
|
16/07/2020
|
|
22/07/2021
|
100
|
151.97
|
100
|
29/09/2022
|
|
538
|
Rajshahi
|
48
|
paba
|
358
|
824
|
UIIP-BC/PCOW-245
|
(a) Construction of RCC Drain Starting Form Dawonpara EID-GHA to Bakrabaz UttorPara Culvert (Ch.00m - 680.00m) Under Katakhali Pourashava, District Rajshahi. (b)Improvement of DC Road Starting from Samsadipur H/O Monju member to H/O Arshad (Ch.00m -230.00m) by Bituminous Dense Carpeting (DC) RCC Retaining Wall under Katakhali Pourashava, District Rajshahi.
|
|
0.23
|
0.00
|
0.00
|
124.53
|
MD. Abdul Mannan
|
108.90
|
25/01/2021
|
15/02/2021
|
15/10/2021
|
90
|
86.40
|
80
|
29/09/2022
|
|
539
|
Rajshahi
|
48
|
paba
|
358
|
824
|
UIIP-BC/PCOW-244
|
(a) Improvement of RCC Road Starting from shyampur Boubazar (Ch.00m-470.00m) Under Katakhali Pourashava, District: Rajshahi.
(b) Improvement of RCC Road Starting from shyampur thandar para Mosque to Beribadh Bottula (Ch.00m-200.00m) With Retaining Wall Under Katakhali Pourashava, District: Rajshahi.
(c) Improvement of RCC Road Starting from Samsadipur Islam Road to Grareg Road ( Ch.00m-250.00m) Under Katakhali Pourashava, District: Rajshahi.
(d) Improvement of RCC Road Starting from Hajrapokur Koayl Pond to H/O Shafi uddin (Ch.00m-200.00m) Under Katakhali Pourashava, District: Rajshahi.
|
|
1.12
|
0.00
|
0.00
|
96.33
|
M/S Mamun Traders
|
82.85
|
25/01/2021
|
15/02/2021
|
25/06/2022
|
90
|
66.65
|
81
|
29/09/2022
|
|
540
|
Rajshahi
|
48
|
paba
|
358
|
824
|
UIIP-BC/PCOW-243
|
(a) Rehabilitation of BC Road Starting from shympur Sayad more to Box Calvert (Ch. 00m -300.00m) by Bituminous Dense Carpeting (DC) Under Katakhali Pourashava, District: Rajshahi. (b)Improvement of DC Road Starting from Shympur Azizur more to Boain shop (Ch.00m -320.00m) by Bituminous Dense Carpeting (DC) RCC Retaining Wall under Katakhali Pourashava, District Rajshahi
|
|
0.62
|
0.00
|
0.00
|
54.06
|
M/S Mamun Traders
|
46.97
|
15/01/2021
|
15/02/2021
|
25/06/2022
|
90
|
18.02
|
39
|
29/09/2022
|
|
541
|
Rajshahi
|
48
|
paba
|
358
|
824
|
UIIP-BC/PCO/W-79
|
(A)Construction of Two Vent Box Culvert (box size4.0mx4.0m) At near Bakrabag Hossin House Cannal Under Katakhali Pourashava, District; Rajshahi. (b) Construction of RCC Box Drain Strting Form West Comer of Maskatadinghi Hi-School to Horian Cannel (Ch. 00-232.00m) Under Katakhali Pourashava, District; Rajshahi. ( c) Rehabilitation of DC Road Starting from Hajrapukur H/O Shafiuddin to Shop of Rejaul (Ch. 00-150.00m) by Bituminous Dense Carpeting (DC) Under Katakhali Pourashava, District; Rajshahi.
|
|
0.15
|
1.00
|
0.00
|
100.90
|
MD. Abdul Mannan
|
90.72
|
15/10/2020
|
|
28/02/2022
|
90
|
72.70
|
80
|
29/09/2022
|
|
542
|
Rajshahi
|
48
|
paba
|
358
|
824
|
UIIP-BC/PCO/W-43
|
(A) Rehabilitation of BC Road Starting from Dawonpara Eid-Gha to Bakerbaz Uttor Para Culvert via katakhali Bazar (Ch.00m-945.0m) by Bituminous Dense Carpeting (DC) under Katakhali Pourashava, District: Rajshahi. (B)Rehabilitation of BC Road Starting from Maskatadighi Shop of Samsul to Shop of Zillur (ch.00-370.00m) By Bituminous Dense Carpeting (DC) With RCC Reataining Wall under Katakhali Pourashava, District: Rajshahi.
|
|
1.32
|
0.00
|
0.00
|
101.22
|
MD. Abdul Mannan
|
91.03
|
15/10/2020
|
|
28/02/2022
|
90
|
45.38
|
50
|
29/09/2022
|
|
543
|
Rangpur
|
53
|
pirganj
|
395
|
824
|
UIIP-BC/PCO/W-465
|
A) Construction of Shed for Public Transport Passenger (28.00 sqm) under Pirgonj Pourashava District: Rangpur.
B) Construction of One Storied Public Toilet (Type A=56 sqm) under Pirgonj Pourashava District: Rangpur.
C) Construction of One Storied Vegetables & Agricultural Products Market of 5 Storied Foundation (Floor Area=314 sqm) under Pirgonj Pourashava District: Rangpur.
|
|
|
0.00
|
3.00
|
151.64
|
Vision 2020
|
115.21
|
14/02/2022
|
20/02/2022
|
13/02/2023
|
0
|
0.00
|
0
|
29/09/2022
|
|
544
|
Rangpur
|
53
|
pirganj
|
395
|
824
|
UIIP-BC/PCO/W-464
|
A) Construction of RCC Drain at Tularam Mojidpur of Asiyar Master house ward No .01 under Pirgonj Pourashava.
B) Construction of RCC Drain at Niyamotpur Ass. Director Golam Feroj house to pacca Drain at word No. 03 under Pirgonj Pourashava.
C) Construction of RCC Drain at Dhonsala Khalashpir Highway road side near Dr.Prince house Curlvert at ward No. 03 under Pirgonj Pourashava.
|
|
|
0.00
|
0.00
|
38.58
|
Vision 2020
|
30.15
|
14/02/2022
|
20/02/2022
|
13/02/2023
|
0
|
0.00
|
0
|
29/09/2022
|
|
545
|
Rangpur
|
53
|
pirganj
|
395
|
824
|
UIIP-BC/PCO/W-463
|
A) Construction of RCC Drain at back side of Pirgonj Govt. Primary School at Abdus Sobhan house ward No. 04 under Pirgonj Pourashava.
B) Construction of RCC road start from Sonakantor Pacca road to Fatik house at word No. 08 under Pirganj Pourashava.
C) Construction of RCC road start from Chothra pacca road to Swakat Master house at Dhonsala ward No. 03 under Pirganj Pourashava
D) Construction of RCC Drain at Thana Para Existing drain to Thana more Highway road side drain word No. 04 under Pirgonj Pourashava
E) Construction of RCC road start from Gharaber Bituminas Carpeting pacca road to Grave yeard at ward No. 03 under Pirganj Pourashava
F) Construction of RCC road start from Sarderpara Bakul house to Mr.Bakul Freedom Fighter house at ward No. 06 under Pirganj Pourashava.
|
|
0.29
|
0.00
|
0.00
|
65.61
|
Vision 2020
|
52.18
|
12/02/2022
|
20/02/2022
|
13/02/2023
|
0
|
0.00
|
0
|
29/09/2022
|
|
546
|
Rangpur
|
53
|
pirganj
|
395
|
824
|
UIIP-BC/PCO/W-462
|
A) Construction RCC Drain at Sonakandor Westpara Akhi Anju house front and Sonakandor pacca Road side at ward No. 08 under Pirganj Pourashava. B) Construction RCC Drain at Pirganj Shakh Hasina Adorsho High School at ward No. 04 under Pirganj Pourashava.
|
|
|
0.00
|
0.00
|
54.46
|
Vision 2020
|
44.11
|
14/02/2022
|
20/02/2023
|
13/02/2023
|
0
|
0.00
|
0
|
29/09/2022
|
|
547
|
Rangpur
|
53
|
pirganj
|
395
|
824
|
UIIP-BC/PCO/W-363
|
a) Construction of Rcc culvert at monna house front Attrai khal under pirgonj pourashava word no 09 ch 300.00m.
b) Construction of Rcc culvert at khalashipir Road URI-UI-70-6543. Prince House front under pirganj pourashava word no 03 ch 0.00m
c) Construction of RCC Curlvert at chothra Road Dhonsala government primary school front under pirgonj pourashava word no 03 ch 20.00m.
d) Construction of Rcc culvert at panir Dorgah Road Under pirganj pourashava word no 03 ch 100.00m
|
|
|
21.19
|
0.00
|
86.83
|
Rabbi Enterprise
|
63.92
|
24/02/2021
|
28/02/2021
|
23/02/2022
|
100
|
45.18
|
70
|
29/09/2022
|
|
548
|
Rangpur
|
53
|
pirganj
|
395
|
824
|
UIIP-BC/PCO/W-362
|
a) construction of RCC Drain at Upazila helth complex under pirgonj pourashava word no 05 ch , 0.00 to 525.0b) construction of RCC Drain Start from niamotpur Abdus salam house front curvert to akhira River under Pirgonj Pourashava word no 03 ch 0.00 to 120.00m.
|
|
|
0.00
|
0.00
|
109.20
|
Vision2020
|
85.17
|
24/02/2021
|
28/02/2021
|
23/02/2022
|
30
|
23.45
|
28
|
29/09/2022
|
|
549
|
Rangpur
|
53
|
pirganj
|
395
|
824
|
UIIP-BC/PCO/W-298
|
a) construction of RCC Road Start from Thana Para pacca road to Rajjak munshi house Salek mondol house Zobbar hazi house ander house sohel Sarder house suly house Under pirganj pourashava word no 04 ch 0.00 to 653.00m
b) construction of RCC Road Start from Bangubandhu school road to pal para sunil house via nurani Musque ander pirgonj pourashava word no 02 ,ch 0.00 to 475.00
c) construction of RCC Road Start from Dudu sarkar house to pacca drain and khalaspir highway to sheik hasina Adarsha Girl School Thana para under pirganj pourashava word no 04,ch 0.0 to 160.00
|
|
1.29
|
0.00
|
0.00
|
121.66
|
M/S Shakib Enterprise
|
99.73
|
27/01/2021
|
03/02/2021
|
26/01/2022
|
60
|
75.62
|
76
|
29/09/2022
|
|
550
|
Rangpur
|
53
|
pirganj
|
395
|
824
|
UIIP-BC/PCO/W-139
|
(A) Construction of RCC Road at Front of Pirganj LSD to Bangobondhu School Via Khier Para Mosque at Ch 0+00m-925m, Word No-07
(B) Construction of RCC Drain at Front of Pirganj LSD to Bangobondhu School Via Khier Para Mosque at Ch 0+00m-925m, Word No-07
(C) Construction of RCC Road at Projapara Bangobondhu School Road Anisar House to Borobila Bill at Ch0+00m-0+210m.Word No-07
(D) Construction of Drain at Projapara Bangobondhu School Road Anisar House to Borobila Bill at Ch 0+00m, word no 07.
(E) Construction of RCC Road at Niamolpur Poschim Para Mosk to Dokkin Para Ismail Mohori House at (Ch 0+00-0+196m, Word No-03
|
|
1.33
|
0.00
|
0.00
|
207.52
|
M/S Moskur Rahman
|
176.20
|
21/09/2020
|
01/10/2020
|
20/09/2021
|
60
|
36.16
|
21
|
29/09/2022
|
|
551
|
Rangpur
|
53
|
pirganj
|
395
|
824
|
UIIP-BC/PCO/W-138
|
(a) Construction of Dense Bituminous Surfacing Road at Tularampur Mojidpur Likhon House to Mohir House Via East Side Borobila & West side RHD Road, Ch0.00-2+255m. Word No-01
|
|
2.26
|
0.00
|
0.00
|
180.47
|
M/S Tahity Enterprise
|
150.25
|
21/09/2020
|
28/09/2020
|
27/09/2021
|
70
|
95.40
|
64
|
29/09/2022
|
|
552
|
Rangpur
|
53
|
pirganj
|
395
|
824
|
UIIP-BC/PCO/W-67
|
(a) Consturction of RCC Road at Pirganj hi way Ripon Garadge to Medergonj H way via Shaju House Word No -06 at ch 0+00 to 1+115m) b) (a) Consturction of RCC Road at Pirganj Dhaka hi way to Medergonj by pass Road at ch 0+00 to 0+480m at word no-07
|
|
1.60
|
0.00
|
0.00
|
158.97
|
M/S
Moskur
Rahman
|
135.12
|
24/02/2021
|
02/03/2021
|
23/02/2022
|
75
|
98.93
|
74
|
29/09/2022
|
|
553
|
Rangpur
|
53
|
pirganj
|
395
|
824
|
UIIP-BC/PCO/W-51
|
(a) Consturction of RCC Road at Pirganj Shapla Para Rabbal House to back side of Ksd Godawan Via Pintu House & Via Hiru House at Ch 0+00m to 0+395m Word No-06
(b) Construction of RC Drian at Pirganj Shapla Para Robbal House to Back Side of Lsd Godawan Via Pintu House & Via Hiru House at Ch 0+00m to 0+395m Word No-06
(C ) Construction of RCC Road at Araji Gongarampur Mis Para Pucca Road to Monno Mia House Via Balal House at Ch 0+00m to 0+605m Word No-09
(d) Construction of RCC Road at Osmanpur Pucca road to Abutahar House at Ch 0+00m to 0+283m. Word No-09
(e) Construction of RCC Road at Jamtola Modinatul Ulim Masrasha at Ch 0+00m to 0+184m. Word No-09
|
|
1.57
|
0.00
|
0.00
|
179.92
|
M/S
Moskur
Rahman
|
152.93
|
21/09/2020
|
01/10/2020
|
20/09/2021
|
60
|
103.41
|
68
|
29/09/2022
|
|
554
|
Sirajganj
|
52
|
belkuchi
|
382
|
824
|
UIIP-BC/PCO/W-425
|
Construction of RCC Drain starting from Chala Eid Ghah Math to Zidhuri Abdur Razzak Mondal House & Chala Thana Gate Uttar to Shah Alam Kazi's house (Ch.0.00-850.00m & Link 0.00-290.00m) in Ward No.-07 Under Belkuchi Pourashava District: Sirajgonj.
|
|
|
0.00
|
0.00
|
202.61
|
M/s. Ocean Enterprise
|
202.51
|
03/04/2022
|
17/04/2022
|
17/04/2023
|
52
|
72.07
|
36
|
29/09/2022
|
|
555
|
Sirajganj
|
52
|
belkuchi
|
382
|
824
|
UIIP-BC/PCO/W-303
|
A) Construction of a RCC Road starting fromBerakharua Govt. Primary Schoo} to Grave yeard (ChO.00-400.00m). Construction of RCC Road starting from Berakharua ZameMosque to Seken Mondal house. Ward no-01,(0.00- 120.00m. B) Construction of a RCC Road starting from Dariapur Boirabari Govt. Primary School to Dariapur Madrasa Graveyeard,Ward no -01-, Sirajgonj ch-O OO-220.00m Under Belkuchi Pourashava,Sirajgonj
|
|
0.74
|
0.00
|
0.00
|
114.89
|
M/s. Zaidul Islam
|
114.84
|
26/09/2021
|
|
24/11/2022
|
45
|
23.70
|
21
|
29/09/2022
|
|
556
|
Sirajganj
|
52
|
belkuchi
|
382
|
824
|
UIIP-BC/PCO/W-302
|
A) Construction of a RCC road starting fromShernagor Moddhapara Govt. PrimarySchool to Ainal Munshi House, Ward no -08,Under Belkuchi Pourashava, ChO.00-280.00m. Under BelkuchiPourashavaSirajgonj. B)Construction of a RCC Road startingfrom Delua Faruk house to Delua Govt.Primary School fch 0.00-400.00m),Ward no-02, Under Belkuchi Pourashava, Sirajgonj
|
|
0.68
|
0.00
|
0.00
|
121.09
|
M/s. Ocean Enterprise
|
121.01
|
18/11/2021
|
10/12/2021
|
24/11/2022
|
60
|
51.22
|
43
|
29/09/2022
|
|
557
|
Sirajganj
|
52
|
belkuchi
|
382
|
824
|
UIIP-BC/PCO/W-300
|
Construction of RCC Road starting from Subarnasara Talpatti to Huda Sarker houseVia Mohi Sarker house to Wapda ,Ward No-04, Under Belkuchi Pourashava, Sirajgonj.(Ch,0.00-300.0m s, link Road 0.00-400.0m . Under BelkuchiPourashavaSirajgonj.
|
|
0.70
|
0.00
|
0.00
|
110.60
|
M/s. Liton Enterprise
|
110.50
|
18/11/2021
|
|
24/11/2022
|
25
|
0.00
|
0
|
29/09/2022
|
|
558
|
Sirajganj
|
52
|
belkuchi
|
382
|
824
|
UIIP-BC/
PCO/W-155
|
A Construction of RCC road starting from Garamasi east Shamim shop to Suzan house via MonnafMoulanas house. Ward no-05 & 07. Under BelkuchiPourashavaSirajgonj. Ch 00m to 0850m
|
|
0.85
|
0.00
|
0.00
|
132.24
|
M/s. Ocean Enterprise
|
101.55
|
18/11/2020
|
|
24/11/2021
|
70
|
41.98
|
42
|
29/09/2022
|
|
559
|
Sirajganj
|
52
|
belkuchi
|
382
|
824
|
UIIP-BC/PCO/W-154
|
A .Construction of a RCC road starting from at ZidhuriRamzanSikder house back side to Halim house. Ward no-04. Under BelkuchiPourashava. Sirajgonj. Ch 000 to 0480m.
B. Construction of RCC road starting from at Khidromatia Chan Ullahs house to Grave Yeard Ward no-02 Under BelkuchiPourashavaSirajgonj. Ch 000 to 0280m
C Construction of RCC road starting from ShernagorAuib Ali house to NuasaryBatan house via Karamot house. ch0.00- 210.00m Link 0.00-160.00m Total370.00m Ward no-08. Under Belkuchi Pourashava Sirajgonj
|
|
1.13
|
0.00
|
0.00
|
153.56
|
M/s. Ocean Enterprise
|
117.63
|
18/11/2020
|
|
24/11/2021
|
50
|
83.12
|
71
|
29/09/2022
|
|
560
|
Sirajganj
|
52
|
belkuchi
|
382
|
824
|
UIIP/BC/ PCO/W-38
|
Construction of a R.C.C Road Starting from Shernagor Latif House to Main Road Via Grave Yeard. Ward No-09. Under Belkuchi Pourashava. Sirajgonj.ch0.00-470.00mB Construction of Mukundaganti Sobhan Member House to Hazi Zulmat house Via Boxs House.Ward No-07 Under Belkuchi Pourashava. Sirajgonj.Ch0.00-190.00m & link road 0.00-120.0m
|
|
0.78
|
0.00
|
0.00
|
132.33
|
M/s. Zaidul Islam
|
108.72
|
26/07/2020
|
03/08/2020
|
02/08/2021
|
100
|
108.67
|
100
|
29/09/2022
|
|
561
|
Sirajganj
|
52
|
belkuchi
|
382
|
824
|
UIIP/BC/ PCO/W-37
|
Construction of a R.C.C Road Starting from Garamasi Selim House to Azizal House via Mantus Tea Stall. Ward No-05. Under Belkuchi Pourashava. Sirajgonj. Ch 830.00m & Link 265.00m
|
|
1.10
|
0.00
|
0.00
|
100.47
|
M/s.Liton Enterprise
|
81.21
|
26/07/2020
|
03/08/2020
|
02/08/2021
|
95
|
63.17
|
78
|
29/09/2022
|
|
562
|
Sirajganj
|
52
|
belkuchi
|
382
|
824
|
UIIP/BC/ PCO/W-36
|
A .Construction of Khidromatia Baniapara Ataur House to Likus house Via Himmat house .Ward No-02 Under Belkuchi Pourashava. Sirajgonj.Ch0.00-400.00m B.Construction of R.C.C Road Starting From Chala Saukat Munsi House to Bolder Bazar. Ward No-03 Under Belkuchi pourashava Sirajgonj.ch0.00-580.0m
|
|
0.98
|
0.00
|
0.00
|
143.09
|
M/s.Liton Enterprise
|
114.98
|
26/07/2020
|
03/08/2020
|
02/08/2021
|
95
|
79.25
|
69
|
29/09/2022
|
|
563
|
Sirajganj
|
52
|
kazipur
|
380
|
824
|
UIIP-BC/PCO/W-353
|
Construction of RCC Drain at Alompur Cohorasta from Beara Khudbandi River Ghate. Ch.0.00-1200m Under kazipur Pourashava Dist-Serajganj.
|
|
|
0.00
|
0.00
|
163.63
|
MMH MAT (JV)
|
117.78
|
05/05/2022
|
12/05/2022
|
04/05/2023
|
0
|
0.00
|
0
|
29/09/2022
|
|
564
|
Sirajganj
|
52
|
kazipur
|
380
|
824
|
UIIP-BC/PCO/W-352
|
Construction of RCC Road Alampur Foker bari Poker paa to Alampur Modea Para Korban Mobber House Ch:0.00-1000m. Under kazipur Pourashava Dist-Serajganj.
|
|
1.00
|
0.00
|
0.00
|
151.09
|
BK&Uzzal(JV)Jamalpur
|
137.51
|
05/05/2022
|
12/05/2022
|
04/05/2023
|
0
|
0.00
|
0
|
29/09/2022
|
|
565
|
Sirajganj
|
52
|
kazipur
|
380
|
824
|
UIIP-BC/PCO/W-198
|
(A) Construction of RCC Road Starting from Beara High School to Nazma Counselor house Ch:0.00-500m, Under kazipur Pourashava, Dist:-Serajganj. (B) Construction of RCC Road from Alampur Haleport to Baripotal Chairpara LGED Bridge Ch:00.00-850.00m, Under kazipur Pourashava, Dist:-Serajganj.
|
|
1.35
|
0.00
|
0.00
|
180.19
|
M/S. LITON ENTERPRISE
|
177.03
|
02/12/2020
|
09/12/2020
|
08/12/2021
|
100
|
173.25
|
97
|
29/09/2022
|
|
566
|
Sirajganj
|
52
|
kazipur
|
380
|
824
|
UIIP-BC/PCO/W-197
|
(A) Construction of RCC Road Starting from Awami League Office East side to Hobe Master house Ch.0.00-425.00m under Kajipur Pourosava, Dist: Sirajganj(B) Construction of RCC Road Starting from Baripotol Pachani Para Moti Talukder house to kobirtain road Ch. 0.00-400.00m Under Kazipur Pourosava, Dist: Sirajgonj(C) Construction of RCC Road from Upazila RHD Road to house to Alimpur Fakirbari House Ch. 0.00-460m Under Kazipur Pourosava, Dist Serajganj.
|
|
1.29
|
0.00
|
0.00
|
132.02
|
MME-MAT (JV)
|
129.27
|
02/12/2020
|
09/12/2020
|
10/12/2021
|
53
|
75.92
|
59
|
29/09/2022
|
|
567
|
Sirajganj
|
52
|
kazipur
|
380
|
824
|
UIIP-BC/PCO/W-196
|
(A) Construction of RCC Road Starting from Beara High School to Nazma Counselor house Ch:0.00-500m, Under kazipur Pourashava, Dist:-Serajganj. (B) Construction of RCC Road from Alampur Haleport to Baripotal Chairpara LGED Bridge Ch:00.00-850.00m, Under kazipur Pourashava, Dist:-Serajganj.(c) Construction of RCC Road from Pouro Supar Bazar Jame Mosque to Pouro New Super market Ch. 0.00-350m under Kazipur Pourosava, Dist Sirajganj
|
|
1.70
|
0.00
|
0.00
|
105.99
|
Mohammad Ali
|
104.38
|
07/12/2020
|
|
13/12/2021
|
100
|
101.23
|
97
|
29/09/2022
|
|
568
|
Sirajganj
|
52
|
kazipur
|
380
|
824
|
UIIP-BC/PCO/W-114
|
A) Construction of RCC Road Baripotal Pechani Para Babu Councelor House to Manjnu house ch 0-00-150m. Under kazipur Pourashava Dist-Serajgonj.(B)Construction of RCC Road from Alampur Procham Para Shaban house road to Shajahan house Ch 00-230m. Under kazipur Pourashava Dist-Serajgonj.C)Construction of RCC Road from Upazila Parished to Alampur Shonkerpara Mozad house ch 0-00-375m. Under kazipur Pourashava Dist-Serajgonj.
|
|
0.76
|
0.00
|
0.00
|
106.16
|
Shah Enterprise
|
84.26
|
10/01/2021
|
29/01/2021
|
06/02/2022
|
100
|
49.74
|
59
|
29/09/2022
|
|
569
|
Sirajganj
|
52
|
kazipur
|
380
|
824
|
UIIP-BC/PCO/W-113
|
(A) Construction of RCC Road Starting from Beara Ashraf House to Dupchal neair Ch:0.00-420m, Under kazipur Pourashava, Dist:-Serajganj. (B) Construction of RCC Road Starting from Beara Pachani Para Jame mosque to Tozam house Ch:0.00-350m, Under kazipur Pourashava, Dist:-Serajganj.
|
|
0.42
|
0.00
|
0.00
|
110.50
|
Shah Enterprise
|
89.44
|
10/01/2021
|
29/01/2021
|
06/02/2022
|
100
|
44.83
|
50
|
29/09/2022
|
|
570
|
Tangail
|
18
|
ghatail
|
140
|
824
|
UIIP/PCO/G-61
|
Implementation of 600.00 nos Waste Basket 9120 ltr) & 20.00 nos Non-motorized vehicle (van) under Ghatail Pourashava District: Tangail.
|
|
|
|
1.00
|
39.89
|
RFL Plastics LTD
|
29.95
|
|
|
|
0
|
0.00
|
0
|
18/11/2024
|
|
571
|
Tangail
|
18
|
ghatail
|
140
|
824
|
UIIP-BC/PCO/W-615
|
" Improvement of Ghatail-Jamuria Road Start From near Shop of Mr. Mukul to Nandongati Mor by Bituminious Carpeting, Under Ghatail Pourashava, Tangail.(Ch.0+1020-0+1880.00m)+Link Road (Ch. 00-35.0m)
"
|
|
0.90
|
|
|
109.94
|
M/S Kirshna Studio
|
105.66
|
17/04/2023
|
24/04/2023
|
23/04/2024
|
100
|
104.78
|
100
|
18/11/2024
|
|
572
|
Tangail
|
18
|
ghatail
|
140
|
824
|
UIIP-BC/PCO/W-545
|
Rehabilitation of Bituminous Carpeting Road Starting From Chandushi Mr. Barek House to Jamal B.sc House Under Ghatail Pourashava,Tangail.(Ch:0.00m-575.00m)
Rehabilitation Of Bituminous Carpeting Road Start from Ghatail Bazar Road Near Amtola Mor to College Mor, Under Ghatail Pourashava,Tangail.(Ch.0.00m-493.00m)
|
|
1.07
|
|
|
74.12
|
M/S Krishna Studio
|
67.44
|
16/11/2022
|
22/11/2022
|
21/11/2023
|
100
|
44.39
|
66
|
18/11/2024
|
|
573
|
Tangail
|
18
|
ghatail
|
140
|
824
|
UIIP-BC/PCO/W-544
|
Construction of RCC Drain from Ghatail Bazar Saw mill road to Ghatail Uttarpara Mosque Near H/O Mahabub Talukder. (Length: 875.00m)
|
|
|
|
|
249.75
|
Abdus Salam Khan
|
239.92
|
07/11/2022
|
11/11/2022
|
11/11/2023
|
25
|
0.00
|
0
|
18/11/2024
|
|
574
|
Tangail
|
18
|
ghatail
|
140
|
824
|
UIIP-BC/PCO/W-424
|
Rehabilitation of Bituminous Carpeting Road start from near Ghatail Bazar Mosque to Dharial near Shop of Mr. Mukul Under Ghatail Pourashava Tangail (Ch.0.00m-1020.00m)
|
|
1.02
|
0.00
|
0.00
|
95.58
|
M/S Durga Enterprise
|
90.64
|
19/05/2022
|
22/05/2022
|
21/05/2023
|
100
|
88.00
|
100
|
18/11/2024
|
|
575
|
Tangail
|
18
|
ghatail
|
140
|
824
|
UIIP-BC/PCO/W-423
|
Construction of RCC road start from Telenga Para near H/O Mr. Rafi to near H/O Mr. Mukter Hossain Under Ghatail Pourashava Tangail (Ch.0.00m-265.00m)
|
|
0.27
|
0.00
|
0.00
|
57.24
|
BHB Nirman Kusholi JV
|
52.71
|
19/05/2022
|
22/05/2022
|
21/05/2023
|
100
|
49.45
|
100
|
18/11/2024
|
|
576
|
Tangail
|
18
|
ghatail
|
140
|
824
|
UIIP-BC/PCO/W-262
|
(a) Construction of R.C.C road start from Chandushi near H/o. Mr. Sukur Mahmud to near H/o. Mr.Goljar Hossain Master, Under Ghatail Pourashava, Tangail.(Ch:0.00m-310.00m). (b) Construction of R.C.C road start from Chandushi near H/o. Mr. Sultan to near H/o. Mr.kazem uddin, Under Ghatail Pourashava, Tangail.(Ch:0.00m-270.00m).
|
|
0.58
|
0.00
|
0.00
|
90.05
|
M/S Durga Enterprise
|
89.28
|
28/11/2021
|
|
28/11/2022
|
100
|
37.23
|
42
|
29/09/2022
|
|
577
|
Tangail
|
18
|
ghatail
|
140
|
824
|
UIIP-BC/PCO/W-261
|
(a) Construction of R.C.C road start from Ghatail- Jamuria Road near Murgi Hat to near H/o. Mr. Abul Kalam Azad, Under Ghatail Pourashava, Tangail.(Ch:0.00m-163.00m). (b) Construction of R.C.C road start from Tangail - Moymensing Road near shop of Mr. Mojnu Miah to Halua para road near H/o. Mr.Ripon, Under Ghatail Pourashava, Tangail.(Ch:0.00m-312.00m).
|
|
0.48
|
0.00
|
0.00
|
86.99
|
M/S Durga Enterprise
|
67.38
|
28/11/2021
|
|
28/11/2022
|
100
|
66.80
|
99
|
29/09/2022
|
|
578
|
Tangail
|
18
|
ghatail
|
140
|
824
|
UIIP-BC/PCO/W-260
|
Construction of R.C.C Road Start From Sobujbag near of Eid gha to near H/O of Mr. Badol, Under Ghatail Pourashava, Tangail.(Ch:0.00m-300.00m)Construction of R.C.C Road Start From Khorabor H/O Mr. Nazrul Islam to near H/O Mr. Sohrab Master, Under Ghatail Pourashava, Tangail.(Ch:0.00m-250.00m)
|
|
0.55
|
0.00
|
0.00
|
82.52
|
M/S Durga Enterprise.
|
65.49
|
16/09/2021
|
|
22/09/2022
|
100
|
65.32
|
100
|
29/09/2022
|
|
579
|
Tangail
|
18
|
ghatail
|
140
|
824
|
UIIP-BC/PCO/W-259
|
Construction of R.C.C Road Start From Polashtoli near H/O Mr. Kh. Gaziur Rahman to near H/O of Mr. Babu, Under Ghatail Pourashava, Tangail.(Ch:0.00m-185.00m)Construction of R.C.C Road Start From Tangail-Mymensingh road near Gorosthan madrasa to Polashtoli to near H/O of Mr. Sana mia, Under Ghatail Pourashava, Tangail.(Ch:0.00m-266.00m)
|
|
0.45
|
0.00
|
0.00
|
72.65
|
M/S Durga Enterprise.
|
61.69
|
16/09/2021
|
|
22/09/2022
|
100
|
61.49
|
100
|
29/09/2022
|
|
580
|
Tangail
|
18
|
ghatail
|
140
|
824
|
UIIP-BC/PCO/W-142
|
Rehabilitation of Betuminus Carpeting road start from near Foterpara Mosque to near H/o. Mr. Muktalib, Under Ghatail Pourashava, (Ch. 00-650m).
|
|
0.65
|
0.00
|
0.00
|
56.69
|
M/s Multiplex Enterprise.
|
52.69
|
25/08/2020
|
09/01/2020
|
31/08/2021
|
100
|
52.43
|
100
|
29/09/2022
|
|
581
|
Tangail
|
18
|
ghatail
|
140
|
824
|
UIIP-BC/PCO/W-141
|
Construction of R.C.C road start from Joinabari Primary school near Box-culvert to Vanikatra near H/o Mr. Abu Hanif, Under Ghatail Pourashava (ch. 00-360m).
|
|
0.36
|
0.00
|
0.00
|
63.83
|
MTN-MME(JV)
|
56.89
|
25/08/2020
|
01/09/2020
|
31/08/2021
|
100
|
56.72
|
100
|
29/09/2022
|
|
582
|
Tangail
|
18
|
ghatail
|
140
|
824
|
UIIP-BC/PCO/W-140
|
Construction of RCC Road start from Ratonpur Primary School to Ghatail Jamuria Road near shop of Mr. Baki Hossain, under Ghatail Pourosava, ch. 00.00-0.750m
|
|
0.75
|
0.00
|
0.00
|
113.17
|
MTN-MME(JV)
|
104.00
|
12/11/2020
|
|
18/11/2021
|
100
|
102.90
|
99
|
29/09/2022
|
|
583
|
Tangail
|
18
|
tangail-s
|
144
|
824
|
UIIP-BC/PCO/W-593
|
(A) Construction of RCC Road starting from Shahid Joglu Road to Mosjid Road at Pachani Bazar Ch 0.00m-85.00m under Tangail Pourashava.
(B) Construction of RCC Drain starting from Shahid Joglu Road to Mosjid Road at Pachani Bazar Ch 0.00m-85.00m under Tangail Pourashava.
|
|
|
|
|
30.13
|
|
0.00
|
|
|
|
0
|
0.00
|
0
|
18/11/2024
|
|
584
|
Tangail
|
18
|
tangail-s
|
144
|
824
|
UIIP/PCO/G-62
|
Implementation & Supply 341 nos Waste Basket (120 ltr) & 36 nos Non-motorized vehicle (van) under Tangail Pourashava District: Tangail.
|
|
|
|
1.00
|
39.97
|
RFL Plastics Limited
|
27.00
|
25/01/2024
|
23/03/2024
|
13/04/2024
|
75
|
20.00
|
74
|
18/11/2024
|
|
585
|
Tangail
|
18
|
tangail-s
|
144
|
824
|
UIIP-BC/PCO/W-536
|
" (A) Construction of CC and RCC Slab back side of Sawkat Ali Supar Poura Market (Cuspule) at Victoria Road Ch.0-290m & link 01 Ch.0-105 Under Tangail Pourashava.
"
(B) Improvement of road near the H/O Khaleq Saheb to Nowjes Saheb at Dewla Ch.0-460m Under Tangail Pourashava.
|
|
0.86
|
|
|
173.00
|
Nabila & Hiru (JV)
|
162.62
|
12/09/2022
|
19/09/2022
|
11/09/2023
|
100
|
149.77
|
92
|
18/11/2024
|
|
586
|
Tangail
|
18
|
tangail-s
|
144
|
824
|
UIIP-BC/PCO/W-532
|
" (A) Construction of RCC Road Starting from Gharinda Road to Borai Beel Ch.0-152m & Link-01 near the H/O Mr. Selim Ch.0-82m Link-02 Near the H/O Mr. Afzal Ch. 0-68m at Biswas betka Under Tangail Pourashava
"
(B) Construction of RCC Drain Starting from Gharinda Road to Boral Beel Ch.0-152m & Link-01 near the H/O Mr. Selim Ch.0-84m Link-02 Near the H/O Mr. Afzal Ch. 0-68m at Biswas betka Under Tangail Pourashava
|
|
0.30
|
|
|
79.33
|
M/S Nabila Enterprise
|
74.72
|
12/09/2022
|
19/09/2022
|
11/09/2023
|
100
|
71.89
|
96
|
18/11/2024
|
|
587
|
Tangail
|
18
|
tangail-s
|
144
|
824
|
UIIP-BC/PCO/W-475
|
A) Construction of One Storied Public Toilet (Type A=56 sqm) at Tangail Victoria Road under Tangail Pourashava, Tangail.B) Construction of One Storied Vegetables & Agricultural Products Market of 5 Storied Foundation (Floor Area=314 sqm) at Tangail Tangail Park Bazer under Tangail Pourashava, Tangail.
|
|
|
0.00
|
2.00
|
144.30
|
M/S Khan Traders
|
137.00
|
28/04/2022
|
15/05/2022
|
14/05/2023
|
7
|
0.00
|
0
|
18/11/2024
|
|
588
|
Tangail
|
18
|
tangail-s
|
144
|
824
|
UIIP-BC/PCO/W-381
|
A) Rehabilitation of road widening (1.175m)starting from Vocational morh to Delduar road by WBM & Carpeting Ch. 270.00-505.00= 235m. under Tangail Pourashava .B) B) Construction of RCC drain starting from Vocational morh to Delduar road Ch. 270.00-505.00= 235m. under Tangail Pourashava.
|
|
0.24
|
0.00
|
0.00
|
90.69
|
MIBL & MFC(JV)
|
84.78
|
23/06/2022
|
30/06/2022
|
29/06/2023
|
91
|
67.01
|
79
|
18/11/2024
|
|
589
|
Tangail
|
18
|
tangail-s
|
144
|
824
|
UIIP-BC/PCO/W-217
|
A) Improvement of road starting from Omarpur road (Near the h/o Mr. Amirul) to Maser Market Ghona Para road by WBM & carpeting at Tangail Pourashava. Ch. 0+000-0+597.00, Ch. 0+203-0+653.00, Ch. 0+303-0+403.00, Total Length=1147.00 m
B) Improvement of road starting from Zilla Sadar road to Choto kalibari road with one (01) link by WBM & carpeting at Tangail Pourashava. Ch. 0+000-0+285 and Link length =50.00
C) Construction of RCC drain starting from Zilla Sadar road to Choto kalibari road at Tangail Pourashava. Ch.0+.000-285.00.
|
|
1.46
|
0.00
|
0.00
|
168.65
|
M/S Hiru Enterprise
|
177.28
|
22/11/2020
|
30/11/2020
|
08/04/2022
|
100
|
132.99
|
100
|
18/11/2024
|
|
590
|
Tangail
|
18
|
tangail-s
|
144
|
824
|
UIIP-BC/PCO/W-147
|
A) Improvement of road starting from Sakrail Bakultoly road to Sontosh Science & Technology University by WBM & Dense carpeting at Tangail Pourashava under. Ch.0+000-1+200m.
B) Improvement of road starting from near the h/o Mr. Khaleque to Tal Tola road by WBM & carpeting Tangail Pourashava. Ch. 0+000-0+150.00
C) Construction of RCC drain starting from near the h/o Mr. Khaleque to Tal Tola road at Tangail Pourashava. Ch. 0+000-0+150.00.
|
|
1.35
|
0.00
|
0.00
|
135.42
|
M/S Das Traders
|
134.63
|
20/09/2020
|
01/10/2020
|
09/12/2020
|
100
|
132.99
|
99
|
29/09/2022
|
|
591
|
Tangail
|
18
|
tangail-s
|
144
|
824
|
UIIP-BC/PCO/W-108
|
A) Rehabilitation of road starting from Vocational morh to Delduar raoad by WBM & Carpeting at Tangail Pourashava. Ch. 0+000-505.00 = 505m. B) Construction of RCC drain starting from Vocational morh to Delduar road at Tangail. Ch.0+.000-516.00. = (Side drain = 505.00m & cross drain = 11.00m
|
|
0.51
|
0.00
|
0.00
|
105.20
|
M/S KAWSAR AKBAR
|
104.69
|
29/10/2020
|
05/11/2020
|
16/01/2022
|
100
|
103.37
|
99
|
29/09/2022
|
|
592
|
Tangail
|
18
|
tangail-s
|
144
|
824
|
UIIP-BC/PCO/W-73
|
Improvement of road starting from Alowa Tarini morh to Alasin road (Berabuchna) via near the house of Badal Ch. 0+000-1+350 and link-1 near the house of Badal to alowa Tarini bakultoly Alasin road ch. 0+822-1+822 by WBM & carpeting at Tangail Pourashava. Total Length = 2,350.00 m, Palisading = Ch. 0+480-0+520 and Ch. 1+460-1+500.
|
|
2.07
|
0.00
|
0.00
|
184.22
|
M/S KAWSAR AKBAR
|
183.51
|
29/10/2020
|
05/11/2020
|
13/01/2022
|
100
|
182.93
|
100
|
29/09/2022
|
|