Urban Infrastructure Improvement Project (1st Revised)

Serial District Name District Code/ID Upazila Name Upazila Code/ID Project ID Package No Scheme Name Road ID Length of Scheme(Km) - Road Length of Scheme(m) - Bridge/Culverts Building Quantity Estimated Amount(LAC) Contractor Name Contract Amount(LAC) Date of Contract (DD/MM/YYYY) Date of commencement (DD/MM/YYYY) Date of Completion (DD/MM/YYYY) Physical Progress(%) Financial Progress (Amount) (LAC) Financial Progress(%) Date of Progress Update (DD/MM/YYYY) Remarks
1 Barguna 2 betagi 2 824 UIIP/PCO/G-33 Implementation & Supply 439 nos Waste Basket (120 ltr) & 30 nos Non-motorized vehicle (van) under Betagi Pourashava District: Barguna. 1.00 39.98 RFL Plastrics Limited 26.60 50 07/10/2024
2 Barguna 2 betagi 2 824 UIIP-BC/PCO/W-305 Construction of one Storied Vegetable & Agricultural Products Market on 3-Storied Foundation (Floor Area= 270.00 sqm) under Betagi Pourashava, Barguna. 1.00 149.90 M/S Shikder Construction 149.75 20/09/2023 20/09/2023 19/09/2024 75 60.69 41 07/10/2024
3 Barguna 2 betagi 2 824 UIIP-BC/PCO/W-550 A) Construction of RCC Road from Madrasha BC road to Al-Amin Mollik Home Ch.0.00m-100.00m and in front of Jalil Mollik Home Ch:0.00-70.00m at ward no.08 Under Betagi Pourashava, Barguna. (Salvage Amount-16,743.00) B) Construction of RCC Road from RHD road to Dhali Khanda road via Panna Home Ch.0.00-371.00m at ward no.03 under Betagi Pourashava, Barguna. (Salvage Amount-31,176.00) C) Construction of RCC Road from Wapda raod to Nondi Bari Ch.0.00-134.00m at Ward No.-06 Under Betagi Pourashava, Barguna. (Salvage Amount-9237.00) 0.68 94.71 M/S Subama Enterprise 94.38 26/07/2023 26/07/2023 25/07/2024 100 80.82 86 07/10/2024
4 Barguna 2 betagi 2 824 UIIP-BC/PCO/W-549 A) Construction of RCC Road with 04 nos U-drain from Khalil Contractor Home to Masud Prof. Home via Moti Khan Home (Ch:0.00-316.00m) at ward no.08 under Betagi Pourashava, Barguna. (Salvage Amount-10,603.00) B) Construction of RCC Road from Madrasha BC road to Nasir Uddin Pijus Home Ch:0.00-175.00m at ward no.08 Under Betagi Pourashava, Barguna. (Salvage Amount-12,701.00) 0.49 84.11 M/S Anfa Enterprise 83.89 26/07/2023 26/07/2023 25/07/2024 100 64.65 77 07/10/2024
5 Barguna 2 betagi 2 824 UIIP-BC/PCO/W-548 A) Construction of RCC Road from Mridha Bari to Khalpar (Ch.0.00-260.00m) at Ward no-04 Under Betagi Pourashava, Barguna. (Salvage Amount-74,988.00)B) Construction of RCC Road with one no. U-Drain from Habib Councillor Home to Alam Councillor Home (Ch.0.00-188.00m) & both side of box Culvert (Ch.188.00-210.00=22.00m) at ward no.03. Under Betagi Pourashava, Barguna. (Salvage Amount-24,773.00) 0.47 77.34 M/S Al-Amin Enterprise 77.18 26/07/2023 26/07/2023 25/07/2024 100 77.13 100 07/10/2024
6 Barguna 2 betagi 2 824 UIIP-BC/PCO/W-537 A) Construction of One no. Shed for Public Transport Passenger (28.00sqm) at Lanch Ghat at Ward No.07, Under Betagi Pourashava, Dist: Barguna. B) Construction of One Storied Public Toilet (Type A=56.00sqm) at Lanch Ghat at ward No.-07 Under Betagi Pourashava, Dist: Barguna. 2.00 47.33 M/S Al-Amin Enterprise 47.23 19/09/2022 19/09/2022 18/09/2023 100 47.10 100 07/10/2024
7 Barguna 2 betagi 2 824 UIIP-BC/PCO/W-39 Construction of RCC road from Daser Bridge to RCC road via Akon Bari & Wazed commander home at ward no.02 & 03.Ch. 00.00m-1073.00m.   1.07 0.00 0.00 93.06 M/S Khan Enterprise 92.96 09/08/2020 16/08/2020 15/08/2020 100 92.96 100 29/09/2022 0.10% Less
8 Barguna 2 betagi 2 824 UIIP-BC/PCO/W-406 A) Construction of RCC Drain from (i) Natun Dack Bangla to Khal (Ch:0.00-125.00m) ward no. 06 (ii) Old Drain to Govt Collage (Ch:0.00-150.00m) ward no 05 (iii) Montu Khan’s House to Khal par (Ch:0.00-150.00m) word no 06 Under Betagi Pourashava District: Barguna. B) Construction of RCC Drain from (i) RCC Road to boro Khal via Paltu Comisoner Home (Ch 0.00-40.00m) word no 07 (ii) RCC Road to boro Khal via Babul Kazi Home Ch. 0.00-36.00mm word no 07 (iii) Sankor Home to Hospital Gate (Ch. 0.00-170.00m) word no 07 (iv) Nazmul Huda home to boro Khal (Ch. 0.00-250.00m) word no 05 (v) Sabdar Chand Munsir Mazar to Faysal Home (Ch.0.00-168.00m) word no 08 (vi) RCC Road to baro Khal via Manik Roy Home (Ch. 0.00-250.00m) word no. 07 Under Betagi Pourashava District: Barguna.   0.00 0.00 171.70 M/S Khan Entr. 171.69 09/11/2021 08/11/2022 100 171.69 100 29/09/2022 As Per
9 Barguna 2 betagi 2 824 UIIP-BC/PCO/W-405 A) Construction of 01 No. 1-Vent Culvert size (3.00X3.00)m of Bapari Bari fornt site word no. 03 Under Betagi Pourashava District: Barguna. B) Construction of 01 No. 1-Vent Culvert size (3.00X3.00)m of Samsul Islam Doctor Bari fornt site word no. 09 Under Betagi Pourashava District: Barguna. C) Construction of 01 No. 1-Vent Culvert size (2.00X2.00)m of Sharif Bari fornt site word no. 02 Under Betagi Pourashava District: Barguna. D) Construction of 01 No.1-Vent Culvert size (2.00X2.00)m of Prashanda's Danga word no 03 Under Betagi Pourashava District: Barguna. E) Construction of 01 No. 1-Vent Culvert size (3.00x3.00)m of Habib Comisonar House Khal fornt site word no. 03 Under Betagi Pourashava District: Barguan. F) Construction of 01 No. 1-Vent size (2.00x2.00)m of Dilip House fornt site word no. 02 Under Betagi Pourashava District: Barguna.   14.00 0.00 79.07 M/S Hakkanur Entr. 79.00 11/09/2021 11/08/2022 100 79.00 100 29/09/2022 0.08% Less
10 Barguna 2 betagi 2 824 UIIP-BC/PCO/W-404 A) Construction of RCC Road with Guide wall from Upazila Parished Gate to South Side Upazila Parished Complex (Ch:0.00-124.00m) all side of Upazila Parished Pond (Ch:0.00-360.00m) Upazila Parished to KG School Via DPHE Office (Ch:0.00-260.00m) at ward No.07 (B) Salamer Barir Culvert to Betagi-Niamoti road (Ch:0.00-176.00m) at ward No.03 under Betagi Pourashava District : Barguna Total Length=920m.   0.92 0.00 0.00 129.48 M/S Shikder Enterprise 129.31 17/05/2022 16/05/2023 32 0.00 0 29/09/2022 0.131% less
11 Barguna 2 betagi 2 824 UIIP-BC/PCO/W-201 A Construction of RCC road form Betagi Niamoti Highway Road to Dafi Howlader Bari via Purbo Betagi Primary School Ch 00.00-518.40 m at Ward no2. Under Betagi Pourashava. B Construction of RCC road form by pass road to Upazila chairman bari Ch 00.00-180.0 m at Ward no9 Under Betagi Pourashava C Construction of RCC work for Khas Kachari Math of Agriculture & Product Market Length-32.00m B-15.00m at ward No. 07 Under Betagi Pourashava.   0.73 0.00 0.00 81.24 M/S Khan Enterprise 81.06 22/10/2020 28/10/2021 100 81.02 100 29/09/2022 0.22% Less
12 Barguna 2 betagi 2 824 UIIP-BC/PCO/W-200 A Construction of RCC Drain from Captain Selim home to Jelepara Mondir via Govt College to Manik Khan home Ch. 00.00-410.00mat ward No. 05. Under Betagi Pourashava Barguna and ii. Construction of RCC Drain in front of Babul Mia home and kacha bazar to Madrasha Ch 00.00-190.00 m at Ward no 08. Under Betagi Pourashava Barguna B Construction of RCC road from College Pond to Humayun Professor via College Mosque 220.00m Betagi-Patuakhali road to Sayed Jakir home 60.00m College road to Harun Fakir home 75.00m at ward no.05 & 1 No. Ward Carpeting road to Tota Member home 200.00m at ward no. 01 Under Betagi Pourashava Barguna.   1.15 0.00 0.00 122.33 M/S Shikder Enterprise 122.09 22/10/2020 28/10/2021 100 122.07 100 29/09/2022 0.19% Less
13 Barguna 2 betagi 2 824 UIIP-BC/PCO/W-199 i. Construction of RCC road form Mahasarak to Baro Khal via Mridha Bari Ch 00.00-250.00m at Ward no:4, ii. Construction of RCC road form Food Godown with palasiding (Ch. 90.00-250.00m ) to Mahamudar Gola Via Khal Par 00.00-300.00m at Ward no:1. Under Betagi Pourashava, iii. Construction of RCC road form Hijoltala Primary School to Joynal Fakir home Ch 00.00-100.00m at Ward no:3 Under Betagi Pourashava, Barguna and iv. Construction of RCC road with side Guide Wall form Upazila Quqrter to WAPDA road via Muslim Koloni Ch 00.00-192.00 m at Ward no: 08 Under Betagi Pourashava, Barguna   0.84 0.00 0.00 85.29 M/S Hakkanur Enterprise 85.10 25/10/2020 01/11/2020 24/10/2021 100 85.10 99 29/09/2022 0.22% Less
14 Barguna 2 betagi 2 824 UIIP-BC/PCO/W-42 A Construction of RCC road form Mahamudar gola to Hafizia Madrasha Ch 00.00-620.0 m at Ward no1 B Construction of RCC road with side Guide Wall Ch. 00.00-35.00m form Rafil Haji bari to Montu commissioner bari via Juwel and Sabina Yeasmin Doly Home Ch. 00.00-275.00m and Biswas bari to Habib commissioner home Ch 00.00-200.0m Total 475.00m at Ward no 03.   1.10 0.00 0.00 96.83 M/S Shikder Enterprise 96.77 09/08/2020 16/08/2020 15/08/2020 100 96.77 100 29/09/2022 0.07% Less
15 Barguna 2 betagi 2 824 UIIP-BC/PCO/W-41 Construction of RCC road form Basonda Govt. Primary School to Carpating Road Via Dali kandha Pul Ch 00-1132 at Ward no3.   1.13 0.00 0.00 98.17 M/S Khan Enterprise 98.13 09/08/2020 16/08/2020 15/08/2020 100 98.13 100 29/09/2022 0.05% Less
16 Barguna 2 betagi 2 824 UIIP-BC/PCO/W-40 A. Construction of RCC road with road side Guide Wall form Baily Bridge to By pass Road Via Goni Howlader Bari Ch 00-627 at Ward no 9 B. Construction of RCC road with side Guide Wall Ch. 302.00-332.00m form Baro khaler par to WAPDA road via Mazibar Howlader bari Ch 00.00-332.0 m at Ward no8.   0.99 0.00 0.00 86.34 M/S Khan Enterprise 86.25 09/08/2020 16/08/2020 15/08/2020 100 86.25 100 29/09/2022 0.10% Less
17 Barishal 5 bakerganj 27 824 UIIP/PCO/G-34 Implementation & Supply 765 nos Waste Basket (120 ltr) & 10 nos Non-motorized vehicle (van) under Bakerganj Pourashava District: Barishal. 1.00 39.97 RFL Plastrics Limited 27.60 10 07/10/2024
18 Barishal 5 bakerganj 27 824 UIIP-BC/PCO/W-551 A)       Construction of RCC Road from Sadar road to Betagi Road (Ch: 0.00-62.00m) Under R&H Bridge at ward No.-02, Under Bakerganj Paurashava. B) Construction of RCC road from Aga baker road to Bongobondhu Road (Ch:0.00-156.00m) Under R&H bridge Bank of Srimonto River at ward No.-08, Under Bakerganj Paurashava. C) Construction of RCC road from Sahebganj road to Sabujbag road west side of twin quarter (Ch: 0.00 -157.00m & Link 7m+7m=14m, Total Length=171m) at ward no 05, Under Bakerganj Paurashava D) Construction of Rustum ali road by RCC from R&H road to T&T road, Ch:0.00-122.00m at ward No.- 04, Under Bakerganj Paurashava E) Construction of RCC road from aga baker khan link road to aga baker khan road west side of Pourashava road (Ch:0.00-119.00m) at ward no. 04, Under Bakerganj Paurashava Construction of RCC road from Talukder bari road to Mollik bari road (Brave Freedom Fighter Abdus Sobhan Mallik Road) (Maim Road Ch: 0.00-120.00m & Link-01=20m, Link-02=80m, Link-03=15m) at ward no 09, Under Bakerganj Paurashva G) Construction of aga baker khan Main Road by RCC (Ch:0.00-51.00=51m) from T&T Road to R&H road at ward No. 04, Under Bakerganj Paurashava. (Dropped) 0.88 145.86 M/S Enterprise 143.47 03/06/2023 03/07/2023 02/06/2024 100 122.18 85 07/10/2024
19 Barishal 5 bakerganj 27 824 UIIP-BC/PCO/W-520 A) Construction of Shed for Public Transport Passenger (28.00sqm) Beside R&H Road Connecting point on Bus stand at ward No.01 Under Bakerganj Pourashava. B) Construction of One Storied Public Toilet (Type A=56.00sqm) Beside R&H Road & Jelkhana Khal at ward No.02 Under Bakerganj Pourashava. 2.00 47.11 M/S Enterprise 51.51 12/09/2022 19/09/2022 11/09/2023 97 44.94 87 07/10/2024
20 Barishal 5 bakerganj 27 824 UIIP-BC/PCO/W-293 A construction of Single Vent RCC 3.00 x 3.00 Box Culvert in khal from R H road to North Azimpur Kshashem Mazi Bari Road. Ward No-07. Under Bakerganj Pourashava B. construction of Single Vent RCC 2.00x2.00 Box Culvert In khal side of Runshi road to West side of Kalam Councilors house. Ward No-O1. Under Bakerganj Pourashava C. construction of Single Vent RCC 2.00x2.00Box Culvert in Varani Khal West side of Bari market. Ward No-OS. Under BakerganjPourashava D. construction of Single Vent RCC 2.00x2.00Box Culvert in Khal Padma Dighivarry road . Ward No-06. Under Bakerganj Pourashava. E. construction of Single Vent RCC 2.00x2.00 Box Culvert in Khal Runshiivarry road to Shampurgami road in front of Unus Hawladers house Ward No-01. Under Bakerganj Pourashava. F construction of Single Vent RCC 2.00x2.00 Box Culvert in Khal Ruhiter par road towards South in front of Akkas Gazi House Ward No-09. Under Bakerganj Pourashava.   13.00 0.00 76.70 M/S Jamal Sarder 76.68 01/08/2021 01/08/2021 31/07/2022 100 72.87 95 29/09/2022 0.028% Less
21 Barishal 5 bakerganj 27 824 UIIP-BC/PCO/W-292 A. Construction of RCC Drain from West side of Rony house to R and H ditch Ward 0 I. Under Bakerganj Pourashava. ChO.00-153.00m 153.00m. B. Construction of RCC Drain from Skin Mridha shop to Thana more Chourasta existing RCC Drain Ch 00-98.00m D I from West side of Skin Mridha shop to Tulatoli River. Ch 00-122.00m D2 from Skin Mridha house to proposed D2 drain Ch 00-92m92m D3.At ward No-03. Under Bakerganj Pourashava C. Construction of RCC Drain from Emdad Khandoker house to R and Khal. At Ward No-07. Under Bakerganj Pourashava.ChOO- 107m. D. Construction of RCC Drain from Md. Kalarn house to Sreemonto river East side of Madrasha Road and West side of Girls School at ward No-05. Under Bakerganj Pourashava. D I ChOO-285m. D2 ChOO-60m.   0.00 0.00 136.59 M/S Muhib Construction 139.35 01/08/2021 01/08/2021 31/07/2022 100 114.05 82 29/09/2022 2.024% Above
22 Barishal 5 bakerganj 27 824 UIIP-BC/PCO/W-291 A Construction of RCC Road from high School road to Primary School and JSU High School.Bakerganj Pourashava.Ward No-04. Under Bakerganj Pourashava B Construction of RCC Road fromR & H road to M. Rahman Sarok. North side of Muzahidia Madrasha Ward No- 02. Under Bakerganj Pourashava. ChOOm-266m266m. C Construction of RCC Road from Sadar road to Ripon Councilors house. Ward No-02. Under Bakerganj Pourashava. ChOOm-244m.D Construction of RCC Road from Sadar road to Tulatoli River & house of ton Chakraborti twowards West. Ward No- 02. Under Bakerganj Pourashava. ChOOm 153m .Link30m   1.03 0.00 0.00 121.91 S/M Enterprise 121.86 01/08/2021 01/08/2021 31/07/2022 100 104.79 86 29/09/2022 0.048% Less
23 Barishal 5 bakerganj 27 824 UIIP-BC/PCO/W-161 A Construction of RCC Road from Bakerganj Betagi Road to Runshi varry Road West side of Kundo Bari towards North ChO.OO-480m480m Ward No-01. Under Bakerganj Pourashava B Construction of RCC Road from Bakerganj Betagi Road to Runshi varry Road infront of Kalarn Councilor house toward west ChO.OO-165m165m. Ward no 01. Under Bakerganj Pourashava C Construction of Graveyard Road by RCC Ch 199-326 m. At ward No 07.Under Bakerganj Pourashava.   0.77 0.00 0.00 95.37 M/S Muhib Construction 95.31 01/11/2020 08/11/2020 30/10/2021 100 94.45 100 29/09/2022 0.063% Less
24 Barishal 5 bakerganj 27 824 UIIP-BC/PCO/W-160 Construction of RCC Road from Akon Bari Road to Talukder Bari Road. Ch0.00-590.00m590.00m and Link Akon 3ari Mosque Ch 0.00-90.00 m. Total Length 680m Ward no- 09.Under Bakerganj Pourashava.   0.68 0.00 0.00 84.68 S/M Enterprise 84.68 01/11/2020 08/11/2020 30/10/2021 100 84.66 100 29/09/2022 As Per
25 Barishal 5 bakerganj 27 824 UIIP-BC/PCO/W-159 Construction of RCC Drain left side of B.I.P Road from Bakerganj Betagi road to Khalifa Bari Khal ChOO.OOm to 510m.Ward No-O1.Under Bakerganj Pourashava and Agabaker Road to High School Road ChOO.OOm to 60m.Ward no- 04Under Bakerganj Pourahava.   0.00 0.00 89.11 S/M Enterprise 89.00 01/11/2020 08/11/2020 30/10/2021 100 88.94 100 29/09/2022 0.047% less
26 Barishal 5 bakerganj 27 824 UIIP-BC/PCO/W-126 Construction of R.C.C road from Sree dhanto bariroad to Atharogasiagami road via Nagor Mollah house.Ward No-0809. Under Bakerganj Pourashava.Ch 00 m- 885 m   0.89 0.00 0.00 99.93 M/S Muhib Construction 99.93 06/10/2020 15/10/2021 100 99.91 100 29/09/2022 As Per
27 Barishal 5 bakerganj 27 824 UIIP-BC/PCO/W-125 Estimate for RCC road of Post Office road to Varani Khal.LGED Approch and Hospital Ch00m-310m and Post Office road to LGED Bridge Approch towards North- East Ch00-240 m.Ward No-05. Under Bakerganj Pourashava. Estimate for Construction of R.C.C road from Bakerganj Betagi road to B.I.P road North Side of Miraz House.Ch 00m to 362 m. Ward No-01.Under Bakerganj Pourashava.   0.60 0.00 0.00 109.23 M/S Muhib Construction 109.22 04/10/2020 15/10/2021 100 109.14 100 29/09/2022 0.01% Less
28 Barishal 5 bakerganj 27 824 UIIP-BC/PCO/W-124 Construction of B.C road from Ruhiterpar R & H to Padma Dighi via Fiha Bricks.Ward No-06. Under Bakerganj Pourashava.Ch 00m - 682m. construction of BC road from R & H road to Hasan Mekar house. Ward No-01. Under Bakerganj Pourashava. Ch00m to ch320 m.   1.00 0.00 0.00 90.17 M/S T M Enterprise 90.17 04/10/2020 15/10/2022 100 89.01 99 29/09/2022 As Per
29 Barishal 5 bakerganj 27 824 UIIP-BC/PCO/W-123 Construction of R.C.C. road from Bakerganj Betagi road to Baroi Bari Bridge infront of B.I.P. Colony.Ward No-01.Under Bakerganj Pourashava.Ch00.00-885.00m. Estimate for Construction of B.C road from Shahebganj road to Shahebganj West Side of Tween Quarter. Ch157-257.00 m100.00 m. Ward no-05.Under Bakerganj Pourashava   0.99 0.00 0.00 91.15 M/S Muhib Construction 91.14 06/10/2020 15/10/2021 100 91.01 100 29/09/2022 0.01% Less
30 Barishal 5 gouranadi 22 824 UIIP/PCO/G-35 Implementation & Supply 602 nos Waste Basket (120 ltr) & 20 nos Non-motorized vehicle (van) under Gournadi Pourashava District: Barishal. 1.00 39.98 RFL Plastrics Limited 29.99 03/04/2024 03/04/2024 02/07/2024 0 0.00 0 07/10/2024
31 Barishal 5 gouranadi 22 824 UIIP-BC/PCO/W-553 A) Improvement of Road from Goat Market Road to Torki Bondor Mutual Trust Bank via Torki High School (Ch. 22.00 to 280.00m) by RCC with a Cross Drain at Ward no. 01, under Gournadi Pourashava, Barishal. B) Improvement of Road from Sawra Shahjahan Howlader House to Sawra Govt. Primary School (Ch 0.00m to 146m) by RCC and One Road cross Drain at Ch.3.00m, Ward No. 06, Gournadi Pourashava, District : Barishal. C) Improvement of BC Road from Hizoltala Paik Bari to Bokultala Road (Ch:174-318m) by Bituminous Dense Carpeting (DC) at Ward No:06 under Gournadi Pourashava, District: Barishal 0.54 75.88 M/S Howleder enterprise 75.86 28/05/2023 28/05/2023 27/05/2024 99 216.31 85 07/10/2024
32 Barishal 5 gouranadi 22 824 UIIP-BC/PCO/W-518 A) Construction of One Storied Public Toilet (Type A=56.00sqm) at ward No.06 Under Gournadi Pourashava, Dist: Barishal B)Construction of Shed for Public Transport Passenger (28.00sqm) at ward No.06 Under Gournadi Pourashava, Dist: Barishal. 0.00 2.00 49.90 M/S Howleder enterprise 49.89 03/07/2022 10/07/2022 29/02/2024 100 48.80 100 07/10/2024
33 Barishal 5 gouranadi 22 824 UIIP-BC/PCO/W-494 A) Construction of Single Vent (2.00x2.00m) RCC Box Culvert at Ashokati-Gerakul Road infront of Paik Bari Ward No.08 Under Gournadi Pourashava Dist: Barishal. B) Construction of Single Vent (2.00x2.60m) RCC Box Culvert at Torkir Char Kashir Mistir Dokan Ward No.02 Under Gournadi Pourashava Dist: Barishal. C) Construction of Single Vent (4.30x4.30m) RCC Box Culvert Over Khal at Torki Vozon Kundu Oil Mil Ward No.02 Under Gournadi Pourashava Dist: Barishal. D) Construction of Single Vent (3.00x3.00m) RCC Box Culvert Over Cannel infront of Torki Omor Roy House Ward No.01 Under Gournadi Pourashava Dist: Barishal. E) Construction of Single Vent (1.30x1.30m) RCC Box Culvert Over Cannel infront of Diashur Chowkider House Road Ward No.08 Under Gournadi Pourashava Dist: Barishal. 14.76 0.00 85.00 M/S Howleder enterprise 84.98 06/06/2022 09/06/2022 05/06/2023 100 83.86 100 07/10/2024
34 Barishal 5 gouranadi 22 824 UIIP-BC/PCO/W-493 A (i) Construciton of RCC Drain from Gournadi-Sarikal GC road North Side of Khan Shoping to via Bhuiya Store to Birendash store to Gournadi river (Ch: 0.00-195m D1) (ii) Ice factory to Shathi Garments (Ch: 0.00-95m D2) (iii) Birendash Store to Sochin Gosh Sweet factory near cannel (Ch: 0.00-95 D3) (iv) Shathi Garments to front of Registry Office (Ch: 0.00-85m D4) (v) Bhuiya Store to Gournadi Cannel ( Ch: 0.00-35m D5) Ward No. 05 Under Gournadi Pourashava Dist: Barishal. B(i) Construciton of RCC Drain Torki Bandor Liton khan store to near by Sheraz Member shop cannel (Ch: 0.00-275m D1) (ii) Torki Bandor High School gate to Fish Market South Corner (Ch: 0.00-155m D2) (iii) Bagdad Hotel near by pond to south side of fish market Main drain (Ch: 0.00-100 D3) (iv) Torki Bandor Mosque to South side main drain (Ch: 0.00-60 D4) at ward No. 01 Under Gournadi Pourashava Dist: Barishal. C (i) Construciton of RCC Drain from Gournadi - Sorikal GC road North side Karim Professor House to Chargadhatali Baitul Noor Mosque (Ch: 0.00-230m D1) (ii) Banker Akbar House to Baitul Noor Masque Main Drain (Ch: 0.00-120m D2) (iii) Baizid Akon House to Ekram Professor House near main Drain (Ch: 4.00-36m D3) (iv) X-Drain Near By Ekram Professor House (Ch: 0.00-04m) Ward No. 05 Under Gournadi Pourashava Dist: Barishal. 0.00 0.00 231.90 M/S Howleder enterprise 231.90 06/06/2022 09/06/2022 31/08/2024 98 218.51 94 07/10/2024 0.001% Less
35 Barishal 5 gouranadi 22 824 UIIP-BC/PCO/W-492 A) Repairing of BC road from Diasur Joshim Shop to Banglabazer road (Ch: 0.00m to 766m) by Bituminus Dense Carpeting (DC) Under Gournadi Pourashava District: Barishal B) Repairing of BC road from Gerakul Govt. Primary School to Dulal Khan Shop (Ch: 0.00m to 1160.00m) by Bituminus Dense Carpeting (DC) and Three U-drain at Ch. 296m 533m 722m ward No.08 Under Gournadi Pourashava District: Barishal C) Construction of RCC road from Diasur kobiraj House to Alamin Howlader House(Ch: 0.00m to 190m) via Shohid Gazi House (Ch: 176.00m to 236m) Under Gournadi Pourashava District: Barishal D) Construction and Installing Palisading for road side development at Pourashava road Tikasar Mintu Howlader House adjacent Pond (201m) by Masonry Brick work and Pre-Cast RCC Post Palisading ward No.05 under Gournadi Pourashava District : Barishal. 2.28 0.00 0.00 115.13 M/S Howleder enterprise 115.11 23/05/2022 30/05/2022 22/05/2023 100 114.63 100 07/10/2024 0.015% Less
36 Barishal 5 gouranadi 22 824 UIIP-BC/PCO/W-491 A) Improvement of road from Madbor Bari Jame-Mosque to Bangla Bazar road (Ch: 0.00m to 518m) by Bituminous Dense Carpeting (DC) with three U-Drain at Ch:100m 196m 350m of Gournadi Pourashava District : Barishal. B) Rehabilitation of BC road South Bijoypur Mamun Furniture to R&H road (Ch: 0.00m to 566m) by Bituminous Dense Carpeting (DC) Gournadi Pourashava District : Barishal. C) Construction of RCC road from Food Godown to Fish Market Bridge (Ch: 0.00m to 135m) Under Gournadi Pourashava District: Barishal D) Repairing of BC road from Gournadi Thanar More to ASP Office Via Rob CEO House (Ch: 0.00m to 330m) by Bituminus Dense Carpeting (DC) Under Gournadi Pourashava District: Barishal 1.55 0.00 0.00 91.59 M/S Howleder enterprise 91.58 23/05/2022 30/05/2022 22/05/2023 100 90.02 100 07/10/2024 0.01% Less
37 Barishal 5 gouranadi 22 824 UIIP-BC/PCO/W-233 (a) Improvement of road from Tikashar Khan Bari Mosque to Upazila Dormetory (Ch 0.00m to 391m) by Bituminous Dense Carpeting (DC), Gournadi Pourashava, District : Barishal. (b) Repairing of BC road from Gournadi Upazila Gate to Gournadi Bazar via Azad Professor House (Ch 0.00m to 673m) by Bituminous Dense Carpeting (DC), Gournadi Pourashava, District : Barishal. (c) Rehabilitation of BC road from Upazilla Public Health Office to Dewan Bari (Ch 0.00m to 240m) by Bituminous Dense Carpeting (DC), Gournadi Pourashava, District : Barishal. (e) Rehabilitation of BC road from Hizoltala Paik Bari road to Bokultala road (Ch 0.00m to 318m) by Bituminous Dense Carpeting (DC), Gournadi Pourashava, District : Barishal 1.50 0.00 0.00 158.69 M/S Howleder Enterprise 70.27 24/11/2020 01/12/2020 30/06/2022 100 70.27 100 07/10/2024
38 Barishal 5 gouranadi 22 824 UIIP-BC/PCO/W-136 (A) Improvement of road from Torki Omor Roy House Bridge to Profullo Chokroborti House Ch 0.00m to 775m by Bituminous Dense Carpeting DC Gournadi Pourashava District Barishal. (B) Rehabilitation of BC road from Torki High School to Kali Khola ch 0.00m to 450m by Bituminous Dense Carpeting DC with Three U-Drain Under Gournadi Pourashava District Barishal. (C) Improvement of road from Sundardi Abdul Mozid Pre-Cadet School to Md. Alomgir Shikder house Ch 0.00m to 558m by Bituminous Dense Carpeting DC Gournadi Pourashava District Barishal. (D) Rehabilitation of BC road from Torki Bandor Goat Market to Anondopur Bridge Ch 0.00m to1328m by Bituminous Dense Carpeting DC Gournadi Pourashava District Barishal. 3.11 0.00 0.00 161.73 M/S Howleder enterprise 155.88 27/10/2020 03/11/2020 30/06/2022 100 155.71 100 07/10/2024
39 Barishal 5 gouranadi 22 824 UIIP-BC/PCO/W-234 (a) Improvement of road from Ashokathi Bazar to Rasel Councilor House (Ch 0.00m to 510m) by Bituminous Dense Carpeting (DC), Gournadi Pourashava, District : Barishal (b) Repairing of BC road from Ashokathi Kacha Bazar to Gerakul Joshim's Shop (Ch 0.00m to 1470m) by Bituminous Dense Carpeting (DC), Gournadi Pourashava, District : Barisha (c) Rehabilitation of BC road from Ashokathi Filling Station to Gerakul Govt. Primary School (Ch 0.00m to 1315m) by Bituminous Dense Carpeting (DC), Gournadi Pourashava, District : Barishal   3.30 0.00 0.00 128.15 M/S Howleder Enterprise 127.67 24/11/2020 01/12/2020 30/06/2022 100 66.14 52 29/09/2022 0.02% Less, Recast done Progress is less for the Scheme No. (b) & (c) due to negligence of the assigned Contractor
40 Barishal 5 gouranadi 22 824 UIIP-BC/PCO/W-137 (A) Improvement of road from Boro Kasba R&H to West side of Allah Mosque via Ex-Counsilor Alebali House Ch 0.00m to 480m by Bituminous Dense Carpeting DC with One U-Drain Gournadi Pourashava District Barishal. (B) Rehabilitation of BC road from Torki Cow Hat to Firoz Howlader House Tin Kona Via Sazol Kazi Counsilor House ch 0.00m to 825m by Bituminous Dense Carpeting DC Under Gournadi Pourashava District Barishal.(C) Improvement of road from Gournadi Goinaghata Bridge to Gournadi Bondar Katcha Bazar via Abdur rob Serniabad Hostel Ch 0.00m to 930m by Bituminous Dense Carpeting DC with Four U-Drain Gournadi Pourashava District Barishal.   2.24 0.00 0.00 149.30 M/S Howleder Enterprise 149.28 27/10/2020 03/11/2020 30/06/2022 100 0.00 0 29/09/2022 0.01% Less, Recast done (Time Extended)
41 Barishal 5 muladi 25 824 UIIP-BC/PCO/W-419 A) Constructin Of 1-Vent 4.00 X4.00m Rcc Box Culvert on Mira Bari Canel.In Ward No.06.Under Muladi Pourashava B) Constructin Of 1-Vent 4.00 X4.00m Rcc Box Culvert on Akkas Howlader Canel Ward No.06 Under Muladi Pourashava C) Constructin Of 1-Vent 3.00 X3.00m Rcc Box Culvert on Monosagong Ghat Canel Ward No.01 Under Muladi Pourashava D) Constructin Of 1-Vent 4.00 X4.00m Rcc Box Culvert on Babul Sardar House Canel Ward No. 08 Under Muladi Pourashava   15.00 0.00 88.72 M/S Al Mamun Entr. 88.57 07/12/2021 14/12/2021 06/12/2022 100 88.55 100 29/09/2022 0.17% Less
42 Barishal 5 muladi 25 824 UIIP-BC/PCO/W-418 Construction Of RCC Drain starting from Dhali Market To East Bajar Ward No-06 Under Muladi Pourashava. Ch.0.00-336m   0.00 0.00 58.60 M/S. DEIP ENTERPRISE 58.23 07/12/2021 14/12/2021 06/12/2022 100 58.21 100 29/09/2022 0.63% Less
43 Barishal 5 muladi 25 824 UIIP-BC/PCO/W-417 A) Construction Of RCC Drain starting from Mithur Bari Culvert To Canel Ward No-04 Under Muladi Pourashava.Ch.0.00-306m B) Construction Of RCC Drain starting from Poura Kitchen Market To Kheya Ghat Ward No-06 Under Muladi Pourashava Ch.0.00-400m   0.00 0.00 123.10 m/s Khan Abdus Sabur 122.92 07/12/2021 14/12/2021 06/12/2022 100 122.87 100 29/09/2022 0.14% Less
44 Barishal 5 muladi 25 824 UIIP-BC/PCO/W-416 A) Construction of RCC Road Starting from Bosar Howlader House To Kazi Kamal House Ch. 0.00-350 m.Ward No.09.Under Muladi Pourashava District Barishal. B) Construction of RCC Road Starting from Arif Shop To Praimary School Ch. 0.00-385m.Ward No.06 Under Muladi Pourashava District. Barishal.   0.74 0.00 0.00 123.61 M/S. DEIP ENTERPRISE 123.32 17/01/2022 23/01/2022 16/01/2023 95 56.28 46 29/09/2022 0.23% Less
45 Barishal 5 muladi 25 824 UIIP-BC/PCO/W-415 A.Construction Of Rcc Road starting from Mira Bari Mosque To Bapary bari House End of River. Ward No.06.Under Muladi Pourashava.Ch.0+00-0+410m.l. B.Rehabilitation Of BC Road Strarting from Terochar Madrasha To Farid Howlader House Ch. 0.00-560m.by Bituminous Dense Carpeting.Ward No.02 Under Muladi Pourashava District. Barisha   0.97 0.00 0.00 98.44 M/S KHAN ABDUS SABUR 98.28 17/01/2022 23/01/2022 16/01/2023 100 98.24 100 29/09/2022 0.17% :Less
46 Barishal 5 muladi 25 824 UIIP-BC/PCO/W-232 01.Construction of RCC Road in Mollah Bazar Bridge To Rastar Matha End Of The River Via Vranir Khal.In Ward No.03.Under Muladi.Pourashava.Ch.000-0820m. 02.Construction of RCC Road in Boroi Tola To Salam mal House Via Sardar Bari.In Ward No.07.Under Muladi Pourashava.Ch.000-0645m.   1.47 0.00 0.00 135.56 M/S KHAN ABDUS SABUR 135.22 30/11/2020 07/12/2020 06/12/2020 100 135.18 100 29/09/2022 0.25% Less
47 Barishal 5 muladi 25 824 UIIP-BC/PCO/W-231 01.Construction Of Rcc Road In East Side of Taltola Bajar To Anwar Shikder House.In Ward No.08.Under Muladi Pourashava.Ch.000-0813.(Salvage Tk=196102.00) 02.Construction of RCC Road in Main Road To Atik House House.In Ward No.02.Under Muladi Pourashava.Ch.000-0450m.(Salvage Tk=129515.00)   1.26 0.00 0.00 120.25 M/S KHAN ABDUS SABUR 120.00 30/11/2020 07/12/2020 06/12/2021 100 119.88 100 29/09/2022 0.21% Less
48 Barishal 5 muladi 25 824 UIIP-BC/PCO/W-116 01.Construction of RCC Road in Launch Ghat To Brick Field Via Mosque In Ward No.05.Under Muladi Pourashava.Ch.000-0780m. 02.Construction of RCC Road in GP Tower To CMB Road Via Sopon House In Ward No.07.Under Muladi.Pourashava.Ch.000-0450m.   1.23 0.00 0.00 112.74 M/S Rupali Construction 112.51 08/09/2020 13/08/2020 12/08/2020 100 112.47 100 29/09/2022 0.20% Less
49 Barishal 5 muladi 25 824 UIIP-BC/PCO/W-115 01.Construction of RCC Road in CMB Road To Poura Border.In Ward No.07.Under Muladi.Pourashava.Ch.000-0892m 02.Construction of RCC Road in Siklone Centre To Stadium.In Ward No.04.Under Muladi Pourashava.Ch.000-0450m.   1.34 0.00 0.00 119.40 M/S Rupali Construction 124.16 09/08/2020 12/08/2021 100 124.09 100 29/09/2022 3.98% above, Revised done
50 C. nawabganj 47 shibganj 341 824 UIIP-BC/PCO/W-485 A) Construction of One Storied Vegetables & Agricultural Products Market of 5 Storied Foundation (Floor Area=314 sqm) at Shibganj Kacha Bazer under Shibganj Pourashava Chapai Nawabganj.   0.00 1.00 104.17 M/S Nisha Enterprise 104.04 28/06/2022 21/07/2022 20/07/2023 0 0.00 0 29/09/2022 0.13% Less
51 C. nawabganj 47 shibganj 341 824 UIIP-BC/PCO/W-357 A) Construction of Single vent Box Culvert (2.6mx2.6m ) at jalmachmary behind Primary School in Shibganj Pourashava Area ward no. 07 under Shibganj Pourashava length- 7.00m B) Construction of Single vent Box Culvert (2.6mx2.6m ) at Chondipur beside H/O Hazrat in Shibganj Pourashava Area. ward no. 07 under Shibganj Pourashava length- 7.00m C) Construction of Single vent Box Culvert (2.6mx2.6m ) at Pitholitala Boglauril in Shibganj Pourashava Area. ward no. 07 under Shibganj Pourashava length- 7.00m D) Construction of Single vent Box Culvert (2.6mx2.6m) at Salimabad Khanpara H/O Gudha Hazil in Shibganj Pourashava Area. ward no. 07 under Shibganj Pourashava length- 7.00m E) Construction of Single vent Box Culvert at Choturpur beside H/O Rakib in Shibganj Pourashava Area. ward no. 07 under Shibganj Pourashava . length- 7.00m   35.00 0.00 77.38 Rithin & G.R (JV) 65.66 16/02/2022 22/02/2022 21/08/2022 100 11.44 17 29/09/2022 15.14% Less
52 C. nawabganj 47 shibganj 341 824 UIIP-BC/PCO/W-356 A) Construction & Re-construction of drain by RCC start from Shibganj Girls School mour to Barendro Road drain via Contractor's Somiti & H/O Lotif ( Ch. 0.00-500.00m) under Shibganj Pourashava .B) Construction of drain by RCC start from Choto Chalk mour to Jalmachmary Barendro Road via Kadomtala Culb ( Ch. 0.00-410.00m) under Shibganj Pourashava .   0.00 0.00 162.06 Rithin & G.R (JV) 138.81 22/02/2022 21/08/2022 15 14.85 11 29/09/2022 14.34% Less
53 C. nawabganj 47 shibganj 341 824 UIIP-BC/PCO/W-355 Construction & Re-Construction of drain by RCC start from Shibganj Bazar Bisu's Shop to Barandro Road via Shibganj Pourashava uttar Gate and H/O Lotif (Ch.: 0.00-623.00m) under Shibganj Pourashava .   0.00 0.00 107.12 MD. Abdul mannan 88.90 22/02/2022 21/08/2022 40 17.90 20 29/09/2022 17.01% Less
54 C. nawabganj 47 shibganj 341 824 UIIP-BC/PCO/W-301 (a) Improvement of existing HBB road by BC start from Dowlatpur Hazipara mosque to H/O Alauddin at Dowlatpur Kabirajpara via Hazaridanga H/O late Sadek to Babupara H/O late Kalu Member. Ch. 00-500.00m ward no. 04 Under Shibganj Pourashava. (b) Improvement of existing HBB road by BC start from Dowlatpur Kadomtala moor to H/O Monirul Principal vai H/O Badol at Dowlatpur Mondoltola. Ch. 00-420.00m. Ward no. 04 Under Shibganj Pourashava. (c) Rehabilitation of Alidanga damage BC road by BC start from H/O Nabokanto dadu to R&H Road Ch. 00-510.00m Under Shibganj Pourashava.   1.43 0.00 0.00 99.83 M/S Rony Enterprise & M/S Shefat International JV 82.18 10/09/2020 30/04/2021 09/09/2021 100 82.18 100 29/09/2022 17.68% Less
55 C. nawabganj 47 shibganj 341 824 UIIP-BC/PCO/W-248 (a) Improvement of Kacha Road by RCC with Protective work starting from Club Road to House of Oni mia via House of Diamond at Mordana Miapara. Ch. 00-125.00m. Under Shibganj Pourashava. b) Improvement of Kacha Road by RCC with Protective work starting from Club Road to House of Yeasin Ali at Mordana. Ch. 00-100.00m. Under Shibganj Pourashava. (c) Improvement of Mordana existing HBB Road by RCC starting from moon light Club to H/O Kalam. Ch. 00-450.00m. Under Shibganj Pourashava (d) Improvement of Kacha Road by RCC Starting from Mordana HBB Road H/O. Khudi to House of Dablu at Mordana. Ch. 00-300.00m. ward no. 09. Under Shibganj Pourashava.   0.98 0.00 0.00 140.81 Opal-Pathbangl- JV 130.95 10/09/2020 30/04/2021 09/09/2021 100 130.94 100 29/09/2022 15.17% Less, Revised
56 C. nawabganj 47 shibganj 341 824 UIIP-BC/PCO/W-247 Improvement of existing earthen Road by BC starting from H/O Polash at Choturpur to H/O Abdul Mannan via H/O Hazrat Ali at Jalmachmary. Ch. 00-1000.00m, ward no. 05, Under Shibganj Pourashava.   1.00 0.00 0.00 83.08 Opal-Pathbangl- JV 71.48 10/09/2020 30/04/2021 09/09/2021 100 71.47 100 29/09/2022 13.97% Less
57 C. nawabganj 47 shibganj 341 824 UIIP-BC/PCO/W-246 (a) Improvemrnt of damage existing BC & WBM Road by Bituminous carpeting starting from Barendro Road to H/O Al-Abdur Razzak via H/O Hazrat Mistiry at Jalmachmary Ch. 00-1400.00m ward no. 07, Shibganj Pourashava. (b) Improvement of existing WBM Road by BC starting from Shop of Tohid to H/O Anamul Maulana at Roshulpur Ch. 00-500.00m. ward no. 06, Under Shibganj Pourashava.   1.90 0.00 0.00 92.43 Hanzu Enterprise & Selim Reza- JV 78.35 10/09/2020 30/04/2021 09/09/2021 100 78.27 100 29/09/2022 15.24% Less
58 C. nawabganj 47 shibganj 341 824 UIIP-BC/PCO/W-240 Rehabilitation of existing damage Selimabab BC & HBB road by BC starting from Shimul Talal Moure to Babupukur via paikor tala. Ch. 00-1110.00m Under Shibganj Pourashava.   1.11 0.00 0.00 89.10 M/S Rony Enterprise & M/S Shefat International JV 76.19 10/09/2020 30/04/2021 09/09/2021 100 76.19 100 29/09/2022 14.49% Less
59 C. nawabganj 47 shibganj 341 824 UIIP-BC/PCO/W-97 Improvement of existing earthen & HBB road by BC start from H/O Humayon to H/O Hazrat via Oktiya Mosjid twowards bottala moor at Chondipur Ch. 00-1000.00m, in ward no. 07. Under Shibganj Pourashava, Dist: Chapai Nawabganj.   1.00 0.00 0.00 94.69 Opal International 95.31 10/09/2020 09/09/2021 100 95.31 100 29/09/2022 1.20% Less, Revised
60 C. nawabganj 47 shibganj 341 824 UIIP-BC/PCO/W-96 (a) Improvement of Existing damage WBM road by BC start from H/O Late Menu Master to H/O Sayed former councilor at Pitholitala with 02 nos R.C.C cross drain. Total length= 1325.00m, ward no. 08 Under Shibganj Pourashava, Dist: Chapai Nawabganj. (b) Improvement of exiting damage HBB road by BC start from H/O Cethu to H/O Alauddin via H/O Subed at Pitholitala north para Ch. 00-650.00m ward no. 03 Under Shibganj Pourashava, Dist: Chapai Nawabganj.   1.98 0.00 0.00 121.55 Opal International 109.39 04/11/2020 11/11/2020 10/11/2021 100 109.29 100 29/09/2022 10.00% Less
61 C. nawabganj 47 shibganj 341 824 UIIP-BC/PCO/W-95 Improvement of existing HBB road by BC start from Mohisgara Borendo road to towards culvert at Mithupur Jagnathpur.Ch. 00-1115.00m, ward no. 09 Under Shibganj Pourashava, Dist: Chapai Nawabganj.   1.12 0.00 0.00 108.83 Opal International 97.94 10/09/2020 09/09/2021 100 97.93 100