Project Scheme Detail List
SL No. Package No. Name Length (Km) Allotment (Lac) Name of Contractor Contract Amount (Lac) Date of Commencement Date of Completion Physical Progress (%) Date of Progress Update Remarks
1 Bhola-s
1 IRIDP-2/BHL/MW-130 (a) Maintenance of South char Anndra Register p. School- Daraogarkhal Bridge via Munshi Bari Road.(Ch.00-1500.00m)(b) Construction of 01 nos 0.75mx0.75m culvert at ch.800 on the same road. 1.5000 33.440 M/S. Haydar Builders 33.440 10/11/2017 100 15/04/2019
2 IRIDP-2/BHL/DW-125 (a) Improvement of Charfession RHD –Kaosaria Dakil Madrasha Gazaria Gc Road ( Ch.00m -1350m)(b) Construction of 03 nos 0.75mx0.75m culvert at ch.300m,625m&1200m on the same road. 1.3500 69.510 Md. Nazrul Islam Chunnu 69.510 16/04/2018 100 15/04/2019
3 IRIDP-2/BHL/DW-124 Improvement of Maler Hat- Raster matha- GC Road Colghat Bazar road( Ch.5000m -5500m) 0.5000 27.000 Md. Bahalul Karim 27.000 30/01/2018 100 15/04/2019
4 IRIDP-2/BHL/DW-123 (a) Improvement of Charsamaya Saheb Ali Bazar- Napiter Poll (Dopa Bari) road (Ch.00m -1300m)(b) Construction of 02 nos 1.50mx1.50m culvert at ch. 314m & 468 on the same road.(c) Construction of 04 nos 0.750mx0.750m culvert at ch. 374m,768m,910m & 990 on the same road. 1.3000 97.060 Md. Emdad Hossain 97.060 20/10/2017 100 15/04/2019
5 IRIDP-2/BHL/DW-116 (a) Improvement of Sikder Bari-Shihaly bari Road (Ch.00-700.00m)(b)Construction of 02 nos 0.75mx0.75m culvert at ch.350m&436 on the same road. 0.7000 39.570 M/s. Bahalul Kariam 39.570 12/02/2018 100 15/04/2019
6 IRIDP-2/BHL/MW-53 Maintenance of RHD ( Howlader hat)-Mukti Camp road (Ch. 00-2000m ) 2.0000 39.090 M/s. Harun-Or-Rashid 39.090 22/11/2016 100 15/04/2019
7 IRIDP-2/BHL/MW-52 a) Maintenance of Bapta Burir Mosque to weast piar khan road (Ch. 00-1000m) (b) Construction of 01no 1.5mx1.5m culvert at ch.520m on the same road. 1.0000 29.840 M/s. Ma Enterprise 29.840 16/08/2016 100 15/04/2019
8 IRIDP-2/BHL/DW-41 (a)Improvement of Barister Kachari-Purbo Char Ilisha –west Berry Bundh road ( Sluceghat Bazar) (Ch. 1000m-2200m) (b) Construction of 04no 0.75mx0.75m culvert at ch.1250m ,1350m,1920m &2030m on the same road. (c) Construction of 01no 2.50mx2.50m culvert at ch.1600m on the same road. 1.2000 67.760 Md. Akter Hossain 67.760 12/05/2017 100 15/04/2019
9 IRIDP-2/BHL/DW-38 Improvement of Amir kha bari – Berry bandh Road.( Ch.00m -800m) 0.8000 47.710 M/s. Monir Traders 47.710 20/08/2017 100 15/04/2019
10 IRIDP-2/BHL/MW-30 Maintenance of Jabal chairman Bari-Hazirhat (Bander par bazar) Road (Ch.00m-2000m) 2.0000 60.330 M/s. Sayem Enterprise 60.330 16/08/2016 100 15/04/2019
11 IRIDP-2/BHL/MW-29 (a) Maintenance of Vilumia Bazar (Bisso road) Chandrow Proshed-Gazirchar hat -Hazir hat road (Ch. 1650-3000m) (b) Construction of 01no 1.5mx1.5m culvert at ch.2002m on the same road. 1.3500 58.710 M/s. Elias Enterprise 58.710 31/12/2016 100 15/04/2019
12 IRIDP-2/BHL/SDW-163 a) Improvement of Dokhin Digoldy bagmara road (Kali khola)- Dimuddi kazi bari road (ch. 00m-830m) ID No. 509185256b) Construction of 03nos 0.75mx0.75m culvert at ch.26m, 110m, 380m on the same road. 0.8300 53.520 Md. Serajul Islam 53.520 08/08/2019 70 11/04/2019
13 IRIDP-2/BHL/MW-132 Maintenance of Shibpur paker Matha Hossain sarder bari Mosque- saru sader bari Mosque. road( Ch.332m -1258m) 0.9260 25.590 M/s. Jahanara Traders 25.590 28/01/2018 100 11/04/2019
14 IRIDP-2/BHL/MW-131 Maintenance of Maler Hat- Raster matha- GC Road Colghat Bazar road( Ch.5500m -7000m) 1.5000 31.140 M/S. Haydar Builders 31.140 16/03/2018 100 11/04/2019
15 IRIDP-2/BHL/MW-129 Maintenance of Bhola Charfession RHD ( NAzu Bepary hat)- Alinagar UP road ( Ch.00m -3870m) 3.8700 79.600 M/S. Sayem Enterprise 79.600 04/06/2017 100 11/04/2019
16 IRIDP-2/BHL/MW-128 (a) (a) Maintenance of Nabipur Bashtala- Kabir Charman Bari- Guramiar hat. road ( Ch.00m -1200m)(b) Construction of 01 nos 0.75mX 0.75m culvert at ch. 480m on the same road. Road ID: 509185250 1.2000 28.020 M/S. Prins Enterprise 28.020 20/08/2017 100 11/04/2019
17 IRIDP-2/BHL/MW-127 Maintenance of Balia Dakil Madrasha –Natun hat Road (Ch.00-1000.00m ) 1.0000 20.390 M/s. Rubel Enterprise 20.390 22/02/2018 100 11/04/2019
18 IRIDP-2/BHL/DW-126 Improvement of Shibpur paker Matha Hossain sarder bari Mosque- saru sader bari Mosque. road( Ch.00m -332m) 0.3320 17.440 M/S. Jarin & Co. 17.440 22/02/2018 100 11/04/2019
19 IRIDP-2/BHL/DW-122 (a) Improvement of Bhola Illisha RHD- Bapta Up- Mohajan Bari Road. ( Ch.00m -570m)(b) Construction of 01 nos 0.75mx0.75m culvert at ch.172 on the same road. 0.5700 35.310 M/S. Sayem Enterprise 35.310 20/12/2017 100 11/04/2019
20 IRIDP-2/BHL/DW-121 Improvement of Velumia Banker hat Road- Salam Charman Bari Road ( Ch.00m -260m) 0.2600 17.170 MS Younus & Sons 17.170 25/12/2017 100 11/04/2019
21 Bhola-S IRIDP-2/BHL/DW-120 Improvement of Road Chairkali GPS Abul Latif Mowaly RNGPS Saji Bari dania Alogo Bari Mosque Road ( Ch.1000m -1810m) 4 0.8100 42.630 M/S. Prins Enterprise 42.630 03/01/2018 100 11/04/2019
22 IRIDP-2/BHL/DW-119 Improvement of Kachia Sogerer Dokan- Korki Road ( Ch.00m -1200m) 1.2000 50.580 M/s. Bahalul Kariam 50.580 20/12/2017 100 11/04/2019
23 IRIDP-2/BHL/DW-118 Improvement of South char Anndra Register p. School- Daraogarkhal Bridge via Munshi Bari Road.(Ch.1500-1870.00m) 0.3700 20.080 MS Younus & Sons 20.080 11/11/2017 100 11/04/2019
24 IRIDP-2/BHL/DW-117 Improvement of South Dighaldi Naricel Tala- Kha Bari Road ( Ch.00m -700m) 0.7000 52.170 M/S. Maa Enterprise 52.170 30/10/2017 100 11/04/2019
25 IRIDP-2/BHL/MW-51 a)Maintenance of Bhola Hospital road –Altaf Member Bari-Kalikirti road (Ch. 00-2000m ) (b) Construction of 03no 0.75mx0.75m culvert at ch.308m,490m&1360mon the same road. (c) Construction of 01no 1.5mx1.5m culvert at ch.656m on the same road. (d) Construction of 01no 2x3.0mx3.0m culvert at ch.02m on the same road. 2.0000 60.140 M/S Lutful Kabir 60.140 30/01/2017 100 11/04/2019
26 IRIDP-2/BHL/MW-50 Maintenance of Bhola-Nasir Majhi Road (Ch. 00-2150m ) 10-Mar-17 2.1500 33.950 M/s. Amdad Hossain 33.950 10/03/2017 100 11/04/2019
27 Bhola-S IRIDP-2/BHL/DW-49 (a)Improvement of Parangonj Bazar –Roshon Alie Howlader Bari –Kalika Nagar GPS Road (Ch. 700-1000m) (b) Construction of 01no 1.5mx1.5m culvert at ch.800m on the same road. 0.3000 26.600 M/s. Bahalul Kariam 26.600 10/06/2017 100 11/04/2019
28 IRIDP-2/BHL/MW-48 Maintenance of Parangonj Bazar –Roshon Alie Howlader Bari –Kalika Nagar GPS Road (Ch. 00-700m) 0.7000 17.060 M/s. Harun-Or-Rashid 17.060 02/04/2017 100 10/04/2019
29 IRIDP-2/BHL/DW-47 Improvement of RHD Porangong bazar – Kachia UP roadRoad.( Ch.1500m -2000m) 0.5000 32.520 M/S Lutful Kabir 32.520 20/05/2017 100 10/04/2019
30 IRIDP-2/BHL/MW-46 (a) Maintenance of RHD Porangong bazar – Kachia UP roadRoad.( Ch.00m -1500m) (b) Construction of 02no 0.75mx0.75m culvert at ch.252m &1020m on the same road. 1.5000 40.720 M/s. Harun-Or-Rashid 40.720 15/12/2016 100 10/04/2019
31 IRIDP-2/BHL/MW-45 a) Maintenance of Rashid khan shop WDB Embank,emt road.(Ch.00-1410m)b) Construction of 01 nos 0.75mx0.75m culvert at Ch. 1135m on the smae road 1.4100 42.020 M/S. Eli Enterprise 42.020 20/12/2017 100 10/04/2019
32 IRIDP-2/BHL/DW-44 (a)Improvement of Uttar Digoldi Rarir hat-Alek jan mia bari –Shahid Salam High School road (Ch. 00-1100m ) (b) Construction of 03no 0.75mx0.75m culvert at ch.05m,120m&1050m on the same road. 1.1000 56.360 Md. Ruhul Amin 56.360 30/08/2017 100 10/04/2019
33 IRIDP-2/BHL/DW-43 (a)Improvement of Patabuniah PIR SAHAB KANKA - Basu Mollaher Bari - A. Rahmania Madrasha - Bercharasto Mostafa Kamal High School Road road (Ch. 00-800m ) (b) Construction of 01no 0.75mx0.75m culvert at ch.80m on the same road. (c) Construction of 01no 1.50mx1.50m culvert at ch.350m on the same road. 0.8000 52.800 M/s. Sayem Enterprise 52.800 12/11/2016 100 10/04/2019
34 IRIDP-2/BHL/DW-42 (a)Improvement of Bheduri A. Huq RPS char Gazi bridge road (Ch. 00-1000m ) (b) Construction of 02no 0.75mx0.75m culvert at ch.24m& 776m on the same road. (c) Construction of 01no 1.50mx1.50m culvert at ch.1600m on the same road. 1.0000 59.050 M/s. Ma Enterprise 59.050 27/03/2017 100 10/04/2019
35 IRIDP-2/BHL/DW-40 Improvement of Kachia Ramdabpur Bazar –Guccagram road ( Ch. 00-1000m) 1.0000 30.500 M/s. Harun-Or-Rashid 30.500 20/06/2017 100 10/04/2019
36 IRIDP-2/BHL/DW-39 (a)Improvement of Charfession RHD Joynagar high School(ma store) – Amir kha bari Road (Ch. 00-700m.) (b) Construction of 02no 0.75mx0.75m culvert at ch.252m &340m on the same road. 0.7000 36.370 M/s. Sayem Enterprise 36.370 20/02/2017 100 10/04/2019
37 IRIDP-2/BHL/DW-31 Construction of 01no 1.05mx0.90m culvert on Bhola Khaya ghat - kalinath Ray Bazer Darger road by pass-ponditer pol-Gazaria at ch.3837m, 2.600 M/S. Priyonti Construction 2.600 25/08/2016 100 10/04/2019
38 IRIDP-2/BHL/MW-28 (a) Maintenance of Vilumia Bazar (Bisso road) Chandrow Proshed-Gazirchar hat -Hazir hat road (Ch. 00-1530m) (b) Construction of 04nos 0.75mx0.75m culvert at ch.150m,240m,630m & 1125m on the same road. 1.5300 57.500 M/s. Sayem Enterprise 57.500 30/04/2016 100 10/04/2019
39 IRIDP-2/BHL/DW-7 Improvement of Jabal chairman Bari-Hazirhat (Bander par bazar) Road from Ch.2000m-3650 1.6500 48.640 M/s. Ruhul Amin 48.640 02/02/2016 16/08/2016 100 10/04/2019  
40 IRIDP-2/BHL/DW-1 (a) Improvement of Char Annando Part-3 Sudis School Al Haz Mofizul Haque Talukder Road from Ch. 00-600m . (b) Construction of 02nos 0.75mx0.0.75m culvert at ch.20m & 500m on the same road. (c) Construction of 01 nos 4x5.00mx5.0m culvert at ch. 340m on the 0.6000 95.590 M/s. Haider Bulders 95.590 27/01/2016 19/07/2016 100 10/04/2019  
41 IRIDP-2/BHL/DW-6 (a) Improvement of Dakhan Balia Naton hat -Lalpur Baribhandth Road via Joinal Moulavi Bari from Ch. 00-950m (b) Construction of 02nos 1.5mx1.5m culvert at ch.150&550m on the same road. 0.9500 54.300 M/s. Jahanara Traders 54.300 03/02/2016 20/06/2017 100 23/12/2018  
42 IRIDP-2/BHL/DW-5 (a) Improvement of Rashid khan shop Forazi bazar Koralia GPS Road from Ch. 00-1700m (b) Construction of 05nos 0.75mx0.0.75m culvert at ch. 300m, 450m, 660m, 935m & 1250m on the same road. 1.7000 91.090 M/S. Priyonti Construction 91.090 02/02/2016 15/03/2017 100 23/12/2018  
43 IRIDP-2/BHL/DW-4 (a) Improvement of Dagaldi Sikder bari –Nepit bari-Santoir hat Road from Ch. 00-1185m (b) Construction of 01no 1.5mx1.5m culvert at ch.364m on the same road. (c) Construction of 03nos 0.75mx0.0.75m culvert at ch. 69m, 265m & 560m on the same road. 1.1800 62.520 M/S. Priyonti Construction 62.520 02/02/2016 23/01/2017 100 23/12/2018  
44 IRIDP-2/BHL/DW-3 Improvement of Bheduria Shomitir hat –Rafique Miar Bari (Banker hat) Road from Ch. 00-1735m. 1.7300 87.260 M/s. Sayem Enterprise 87.260 02/02/2016 25/07/2016 100 23/12/2018  
45 IRIDP-2/BHL/DW-2 (a) Improvement of Tulatoli road Kaninagor GPS–Mostafa Chairman bari Nazu kha bari Road from Ch. 00-1525m. (b) Construction of 03nos 0.75mx0.0.75m culvert at ch.1390m, 1500m & 1585m on the same road. 1.5200 56.900 Md. Akter Hossain 56.900 17/01/2016 11/07/2016 100 23/12/2018  
2 Borhanuddin
1 IRIDP-2/BHL/DW-140 (a) Improvement of Shanter hat Moulobir hat road-Khyar hat road (Ch.772m -1474m) ID No.509215122 & community clinic link.35.0m(b)Construction of 01nos 1.0mx1.0m culvert at ch.1435 on the same road. 0.7370 45.080 JC & EE (JV), 45.080 100 15/04/2019
2 IRIDP-2/BHL/DW-95 (a) Improvement of R&H (Helth Complex) South East Ful Kachia Road ( Ch.00m -916m)(b) Construction of 03 nos 1.0mx1.0m culvert at ch. 136m,317m&619 on the same road. 0.9160 61.030 M/S. Priyonti Construction 61.030 26/12/2016 100 15/04/2019
3 IRIDP-2/BHL/DW-94 (a) Improvement of Kutuba 4No word Hazirhat - Patowary Bari via uttar Pachim Chotomanika GPS Road ( Ch.00m -1125m)(b) Construction of 01 nos 1.0mx1.0m culvert at ch. 619m on the same road.(c) Construction of 03 nos 0.625mx0.60m culvert at ch. 210m,240m & 390m on the same road. 1.1250 66.710 M/S. Priyonti Construction 66.710 12/07/2017 100 15/04/2019
4 IRIDP-2/BHL/DW-35 Improvement of Santir hat – Moulobir hat – Khayer hat road .( Ch.00m -550m) 0.5500 29.050 M/s. Nobarun Traders Ltd. 29.050 10/06/2017 100 15/04/2019
5 IRIDP-2/BHL/MW-34 (a)Maintenance of Borhanuddin Halipad – Gongapur Up Office Road.( Ch.00m -3934m) (b) Construction of 01no 1.0mx1.0m culvert at ch.1750m on the same road. 3.9340 136.350 M/S. Priyonti Construction 136.350 16/08/2016 100 15/04/2019
6 IRIDP-2/BHL/DW-145 (a)Improvement of Kutubia Miabari GPS (UZR) – Muslem bari road ( ch.00m-850m) ID No.509215270 (b)Construction of 03nos 0.625mx0.60m culvert at ch.32m,240m,576m on the same road.(c)Construction of 02nos 1.0mx1.0m culvert at ch.3000m,760m on the same road. 0.8500 55.760 M/S. Z.R Traders 55.760 10/08/2018 100 15/04/2019
7 IRIDP-2/BHL/DW-141 (a) Improvement of Jonab Ali RPS to Sultan Kha Bari road (Ch.00m -2000m) ID No.509215101(b)Construction of 03nos 1.0mx1.0m culvert at ch.35m,280m,396m on the same road.(c)Construction of 03nos 0.625mx0.60m culvert at ch.450m,510m,1528m on the same road. 2.0000 129.370 MS Roni Construction 129.370 10/12/2018 100 15/04/2019
8 IRIDP-2/BHL/DW-146 (a)Improvement of Ranigonj road - Khayer hat road ( ch.00m-353m) ID No.509215272 (b)Construction of 01nos 1.0mx1.0m culvert at ch.270m on the same road.(c)Construction of 01nos 0.625mx0.60m culvert at ch.204m on the same road.(d)Improvement of Kutba Mukles Pandit bari towards west upto Paurashava border road ( ch.00m-388m) ID No.509215271 (e)Construction of 03nos 0.625mx0.60m culvert at ch.112m,179m,312m on the same road. 0.7410 48.250 M/S. Sharmin Enterprise 48.250 11/04/2018 100 15/04/2019
9 IRIDP-2/BHL/DW-96 Improvement of Dargh-Moniram Munshirhat Road ( Ch.3400m -3670m) 0.2700 17.570 M/S. Priyonti Construction 17.570 24/12/2017 100 15/04/2019
10 IRIDP-2/BHL/DW-93 (a) Improvement of Manikahat Kaykobad Road - Laxmipur GPS Via Mostafij bari link Road ( Ch.00m -750m)(b) Construction of 03 nos 1.0mx1.0m culvert at ch. 99m,490m & 540m on the same road. 0.7500 53.200 M/S. Priyonti Construction 53.200 26/12/2016 100 15/04/2019
11 IRIDP-2/BHL/DW-92 (a) Improvement of Manikahat Uttor RHD - Gangapur Road ( Ch.1600m -2615m)(b) Construction of 02 nos 1.0mx1.0m culvert at ch. 2250m & 2550m on the same road. 1.0150 71.810 M/S. Priyonti Construction 71.810 10/06/2017 100 15/04/2019
12 IRIDP-2/BHL/MW-91 (a) Maintenance of Darun-Davirchar Rd.-BWDB Emb.Road ( Ch.00m -650m)(b) Construction of 03 nos 1.00mx1.00m culvert at ch. 220m,300m & 405m on the same road. 0.6500 28.520 M/S. Priyonti Construction 28.520 06/02/2017 100 15/04/2019
13 IRIDP-2/BHL/DW-90 (a) Improvement of Char Gazipur mahruddin bari deula border - Deula Up office , chan miar hat connecting road ( Abdur rashid shaje Road ) ( Ch.00m -2100m)(b) Construction of 04 nos 1.00mx1.00m culvert at ch. 115m,750m,900m&1830 on the same road.(c) Construction of 03 nos 0.625mx0.60m culvert at ch. 200m,1050m & 1390m on the same road. 2.1000 126.480 M/s. Priyonti Construction 126.480 30/07/2017 100 11/04/2019
14 IRIDP-2/BHL/DW-37 (a)Improvement of Tazemuddin RHD – Matkhola GPS Road (Ch. 00-3558m.) (b) Construction of 03no 1.00mx1.0m culvert at ch.217m,1187m &1344m on the same road. (c) Construction of 06no 0.625mx0.60m culvert at ch.114m,765m,1070m, 1199m 3156m &3210m on the same road. 3.5580 217.910 M/S. Priyonti Construction 217.910 27/01/2017 100 11/04/2019
15 IRIDP-2/BHL/DW-36 (a)Improvement of Manikar hat – Khayer hat GCRoad.( Ch.00m -347m) (b) Construction of 01no 1.0mx1.0m culvert at ch.238m on the same road. 0.3470 27.000 M/s. Howlader Construction 27.000 10/06/2017 100 11/04/2019
16 IRIDP-2/BHL/DW-11 (a) Improvement of Deula UP Talkukder Hat road Horjon Ali Bari (Darun-Davirchar Rd-UP Office-BWDB Emb. Deula Talukder Bari) Road from Ch. 00-1512m Construction of 02nos 1.0m x 1.0m culvert at ch. 557m, & 976m on the same road 1.5100 80.070 M/s. Nobarun Traders Ltd. 80.070 24/01/2016 16/07/2016 100 23/12/2018  
17 IRIDP-2/BHL/DW-10 (a) Improvement of Sachara RHD-Darun GCCR via Sharif Bari Road from Ch. 1910-4000m (b) Construction of 07nos 01.0mx1.0m culvert at ch. 2085m, 2480m, 2710m, 2940m, 3162m, 3586m & 3972m on the same road. 2.0900 122.830 M/s. Howlader Construction 122.830 02/02/2016 25/01/2017 100 23/12/2018  
18 IRIDP-2/BHL/DW-9 (a) Improvement of Azad Nagar Belayet Master Bari via Joynagar Border (Motiarmar Tank Laxmipur GPS) Road fromCh. 00-1525m (b) Construction of 03nos 01.0mx1.0m culvert at ch.914m, 1164m & 1350m on the same road. 1.5200 79.860 M/S. Priyonti Construction 79.860 02/02/2016 25/07/2016 100 23/12/2018  
19 IRIDP-2/BHL/DW-8 (a) Improvement of Dargh-Moniram Munshirhat Road from Ch. 2036-3400m. (b) Construction of 02nos 0.625mx0.6m culvert at ch. 3205m & 3310m on the same road. 1.3700 78.800 M/s. Rohima Construction 78.800 26/01/2016 28/02/2017 100 23/12/2018  
3 Charfassion
1 IRIDP-2/BHL/MW-157 Maintenance of Charfession GC-Dularhat GC Road( ch.2890m-2918m) & 8.0m Box culvert at ch.2900m. ID No.509252001 0.0280 8.550 Md. Bahalul Karim 8.550 10/10/2018 100 18/04/2019
2 IRIDP-2/BHL/DW-155 (a)Improvement of Jinnagor Union RHD (Motalab Faraji Bari ) - North Way of Aliulla Mia Bari via Jahangir Sardar Bari road ( ch.1200m-1605m) ID No.509254239(b)Construction of 02nos 0.75mx0.75m culvert at ch.1400m,1520m on the same road. 0.4050 32.440 M/s. Bokshi Enterprise 32.440 05/12/2018 100 18/04/2019
3 IRIDP-2/BHL/DW-150 Improvement of Anjurhat Bazar 39.440 Nabarun Traders Limited 39.440 04/06/2018 100 18/04/2019
4 IRIDP-2/BHL/DW-149 Improvement of Shashibhussion Bazar 43.940 Nabarun Traders Limited 43.940 06/06/2018 100 18/04/2019
5 IRIDP-2/BHL/DW-24 (a) Improvement of Road from Miakhamar- Surodip khal Via M.P Nazimuddin alam road from ch. 00m-1050m. (b) Construction of 02nos 2x 4.5mx3.5m culvert at ch.190m&695.0 on the same road. c) Construction of 02nos 0.75mx0.0.75m culvert at ch.901m & 1287m on the same road. 1.0500 93.940 M/s. Bhuya Enterprise 93.940 02/10/2017 100 18/04/2019
6 IRIDP-2/BHL/MW-161 Maintenance of Charfession (Jalu Munshir Chowmohani)-Betua Embankment via Aslampur UP office Roadroad ( ch.2600m-5225m) ID No.509253028 2.6250 81.240 M/s. Khan Traders 81.240 06/03/2018 100 18/04/2019
7 IRIDP-2/BHL/MW-160 (a)Maintenance of Charfession (Jalu Munshir Chowmohani)-Betua Embankment via Aslampur UP office Roadroad ( ch.00m-2600m) ID No.509253028(b)Construction of 02nos 0.75mx0.75m culvert at ch.50m,520m on the same road. 2.6000 93.070 Nabarun Traders Limited 93.070 10/04/2018 100 18/04/2019
8 IRIDP-2/BHL/DW-159 (a)Improvement of Charfassion – Dularhat road ( East side of FDA office) – Islam para Abubajar Jame Mosque road ( ch.1200m-1550m) ID No.509254275(b)Construction of 02nos 0.75mx0.75m culvert at ch.1355m,1500m on the same road. 0.3500 31.230 M/s. Khan Traders 31.230 05/04/2018 100 18/04/2019
9 IRIDP-2/BHL/DW-158 (a)Improvement of Chand Mia Sikder hat West way Ali Member house via Mynuddin Moulana bari road ( ch.00m-610m) ID No.509254273(b)Construction of 02nos 0.75mx0.75m culvert at ch.105m,307m on the same road. 0.6100 44.090 M/S. Saymum Traders 44.090 10/07/2018 100 18/04/2019
10 IRIDP-2/BHL/DW-156 Improvement of H/O Chand Mia Howlader bari road ( ch.00m-292m) ID No.509254276 0.2920 28.520 M/s. Bokshi Enterprise 28.520 03/06/2018 100 18/04/2019
11 IRIDP-2/BHL/DW-154 (a)Improvement of Thakurbari – DilMohammad bari road ( ch.00m-507m) ID No.509254274(b)Construction of 02nos 0.75mx0.75m culvert at ch.116m,310m on the same road. 0.5070 36.710 M/s. Khan Traders 36.710 24/04/2018 100 18/04/2019
12 IRIDP-2/BHL/MW-153 Maintenance of Batua RHD Road (East Side of Border Hat) - Thalakhali Khal ( Ahmmed Ali Patowary Bari) via Ayasha Bag Nurjahan GPS & Madrasha road ( ch.00m-608m) ID No.509254110 0.6080 20.300 M/S. Saymum Traders 20.300 05/03/2018 100 18/04/2019
13 IRIDP-2/BHL/DW-152 Improvement of Chowmohoni Bazar 0 24.910 M/s. Khan Traders 24.910 23/03/2018 100 18/04/2019
14 IRIDP-2/BHL/MW-151 Maintenance of Jinnagar Aslampur Boarder Culvert - Bhuya Bari via Kazi Bari. road ( ch.00m-800m) ID No.509255014 0.8000 19.720 M/S. Saymum Traders 19.720 05/03/2018 100 18/04/2019
15 IRIDP-2/BHL/MW-115 Maintenance of Charfassion GC Dulahat GC Road (Sukkurer Dokan)-R&H Kashemgonj Bazar.Road. ( Ch.500m -2750m) 2.2500 33.980 M/S. Jasim Construction 33.980 30/01/2018 100 18/04/2019
16 IRIDP-2/BHL/MW-114 (a)Maintenance of Hazarigonj UP Khajurgachia road to east way of Baribadh via Jhinuk Abashion Road. ( Ch.00m -1015m)(b) Construction of 01 no 1.50mx1.50m culvert at ch.888m on the same road. 1.0150 45.540 M/s. Bokshi Enterprise 2 45.540 22/02/2018 100 18/04/2019
17 IRIDP-2/BHL/MW-113 (a)Maintenance of Imamgonj Bazar (Nila Brick Field) - WDB Emblk.(Suruj Mazir Maschid) Near East Side of Ali Bapari Bazar via Nazimer Dokan.Road. ( Ch.2410m -4120m)(b) Construction of 05 nos 0.75mx0.75m culvert at ch.2718m,2928m,3183m, 3330m&4013m on the same road. 1.7100 57.160 M/S. Jasim Construction 57.160 25/02/2018 100 18/04/2019
18 IRIDP-2/BHL/MW-112 (a)Maintenance of Chairman Bazar GC Road (Kamal Chairman Old House) - Vhuter khal Bazar via Kalur Dokan Road. ( Ch.00m -1865m)(b) Construction of 01 nos 2x4.50mx3.50m culvert at ch. 1465m on the same road. 1.8650 59.200 M/s. Khan Traders 59.200 22/02/2018 100 18/04/2019
19 IRIDP-2/BHL/MW-111 Maintenance of Katabunia G.P.S.-Sultanmiar Hat. ( Ch.00m -1835m) 1.8350 51.380 M/s. Bokshi Enterprise 51.380 03/01/2019 100 18/04/2019
20 IRIDP-2/BHL/MW-110 (a)Maintenance of Samraj ( Naktibari) - Chairman Bazar Road (Siddiqe Dokan.) (Old Name:-.Samraj - Char kalmi west Border Road.4073) ( Ch.1366m -2360m)(b) Construction of 01 nos 1.50mx1.50m culvert at ch.1420m on the same road. & Girder bridge maint, ch.1913m 0.9940 47.680 M/S. Saymum Traders 47.680 28/02/2018 100 18/04/2019
21 IRIDP-2/BHL/MW-109 (a)Maintenance of Shaheber Hat - Dularhat Road (Sukurer Dokan). ( Ch.00m -460m)(b) Construction of 01 nos 1.50mx1.50m culvert at ch.352m on the same road. 0.4600 19.320 M/s. Khan Traders 19.320 30/01/2018 100 18/04/2019
22 IRIDP-2/BHL/MW-108 Maintenance of Kalmi bridge bazar-South Char Aicha bazar via Rasulpur UP Office ( Ch.00m -1000m) 1.0000 43.300 M/s. Bokshi Enterprise 43.300 09/06/2019 100 18/04/2019
23 IRIDP-2/BHL/MW-107 Maintenance of Jinnaganar UP-Dularhat-Hazirhat via Abdullahpur UP Office ( Ch.00m -1080m) 1.0800 36.310 M/S. Saymum Traders 36.310 20/02/2019 100 18/04/2019
24 IRIDP-2/BHL/MW-106 Maintenance of Char Coschhopia Khaya ghat Moszid - South Way of Dulal Miar Ice Factory. ( Ch.00m - 245m) 0.2450 27.690 M/s. Khan Traders 27.690 18/04/2018 100 17/04/2019
25 IRIDP-2/BHL/MW-105 Maintenance of Gazaria GC-Char Manika RHD via Dularhat, Anjurhat Road(Charfesion part) ( Ch.44230m -44780m) 0.5500 20.560 M/S. Saymum Traders 20.560 30/12/2017 100 17/04/2019
26 IRIDP-2/BHL/MW-104 Maintenance of Charfession GC-Dularhat GC Road ( Ch.00m -1500m) 1.5000 58.480 M/s. Khan Traders 58.480 25/10/2017 100 17/04/2019
27 IRIDP-2/BHL/DW-76 a) Improvement of road from Abubkarpur UP Office (UZR) – Mukharbunda Bazar via Moddho Osmangonj 04 No & 3 No GPS from 1290 -3160m.b) Construction of 03 nos 0.750mx0.750m culvert at ch. 1515,1980 & 2155m on the same road. 1.8700 125.640 Mr. Md. Enus Al Mamun 125.640 15/01/2018 100 17/04/2019
28 IRIDP-2/BHL/DW-75 a) Improvement of road from Shashibhussion Bazar Atkopat road - Vashanchar Abason road via Dholu Bapari RNGS (RHD) from Ch.00-145.00m.b) Construction of 01 no 0.750mx0.750m culvert at ch. 135m on the same road. 0.1450 11.330 M/s. Khan Traders 11.330 12/03/2017 100 17/04/2019
29 IRIDP-2/BHL/MW-74 Maintenance of road from Dularhat GC - Roychand GC road from Ch.00-1463m. 1.4630 68.820 M/s. Tohura Enterprise 68.820 13/04/2017 100 17/04/2019
30 IRIDP-2/BHL/MW-73 Maintenance of road from Nurabad Suknakhali Bazar - North way of Ghosherhat Beribadh from Ch.00-1980m. 1.9800 54.810 M/s. Bokshi Enterprise 54.810 30/11/2017 100 17/04/2019
31 IRIDP-2/BHL/MW-72 Maintenance of road from Aslampur UP Office (Bhuyar hat) – Charfassion Bazar via Dr. Shahalm Sharif House from Ch.2600-3523.00m. 0.9230 26.110 M/s. Monir Enterprise 26.110 15/03/2017 100 17/04/2019
32 IRIDP-2/BHL/MW-71 a) Maintenance of road from RHD Road (Miajir Khamar) –West way of 99.00m Girder Bridge (UZR) from Ch.00-840.00m.b) Construction of 01 no 0.750mx0.750m culvert at ch. 319m on the same road. 0.8400 21.590 M/s. Khan Traders 21.590 15/03/2017 100 17/04/2019
33 IRIDP-2/BHL/MW-70 Maintenance of road from Kalapania Bridge -North way of Nayebar Pool bazar (old name : Aslampur UP Border –Osmangonj Beribadh road 4072) from Ch.2670.00-3480.00m. 0.8100 22.530 M/s. Bokshi Enterprise 22.530 28/01/2018 100 17/04/2019
34 IRIDP-2/BHL/MW-69 a) Maintenance of road from Nayber Bridge Bacharkandi - Shashibhussion Gazaria road from Ch.00-2420.00m.b) Construction of 05 nos 0.750mx0.750m culvert at ch. 660,1673,1787,2005 & 2403m on the same road.c) Construction of 01 no 1.50mx1.50m culvert at ch. 907m on the same road. 2.4200 98.780 Mr. Md. Enus Al Mamun 98.780 29/12/2017 100 17/04/2019
35 IRIDP-2/BHL/MW-68 a) Maintenance of road from Abubkarpur UP office – Mukharbandha bazar via Osmangonj Motaleb Miar hat from Ch.3160-6050.00m.b) Construction of 02 nos 0.750mx0.750m culvert at ch. 5918 & 5986m on the same road. 2.8900 77.070 M/s. Jashim Construction 77.070 02/01/2017 100 17/04/2019
36 IRIDP-2/BHL/MW-67 Maintenance of road from Rasulpur UP 2 No Word Monir Pandith Bari – Dakkin Way of T&T road from Ch.00-1190m. 1.1900 36.790 M/s. Monir Enterprise 36.790 10/03/2017 100 17/04/2019
37 IRIDP-2/BHL/MW-66 Maintenance of road from Kalmi bridge bazar –south char Aicha bazaar Rasulpur UP office road from Ch.4170-4710m. 0.5400 13.310 M/s. Khan Traders 13.310 10/03/2017 100 17/04/2019
38 IRIDP-2/BHL/DW-65 Const of 1 no 2 x 4.0m x 3.50m (W-4.26m) Double vent RCC Box Culvert on south side of Khasemgonj Bazar (RHD) -Mina Bazar (UZR Road) at Ch. 300.00m. 18.290 M/s. Bokshi Enterprise 18.290 12/03/2017 100 17/04/2019
39 IRIDP-2/BHL/DW-64 Improvement for 1 no Culvert Approach on Gazaria GC –Char Manika RHD via Dularhat Anjurhat road Ch.7070-7100.00m & 7115-7140m. 0.0550 7.110 M/s. Monir Enterprise 7.110 12/03/2017 100 17/04/2019
40 IRIDP-2/BHL/MW-63 Maintenance of road from RHD Panirkal –Dowlatgonj Bazar road from Ch.00-1207.00m. 1.2070 43.480 M/s. Jashim Construction 43.480 12/03/2017 100 17/04/2019
41 IRIDP-2/BHL/MW-62 Maintenance of road from Ewaspur Up Office – Goaldehat-Belayet Chowkider more from Ch.00-856.00m. 0.8560 24.510 M/s. Bokshi Enterprise 24.510 15/03/2017 100 17/04/2019
42 IRIDP-2/BHL/MW-61 Maintenance of road from Nilkamal Up (Ghosherhat) Hazirhat (Maya river) from Ch.00-1840.00m. 1.8400 54.650 M/s. Jashim Construction 54.650 15/03/2017 100 17/04/2019
43 IRIDP-2/BHL/DW-60 Improvement for 4 nos Bridge Approach on Dularhat GC (Abubkarpur Chowmohani Hat) – Kalmir More RHD (Shashibhussion GC) via Fakirhat road at Ch. 3551-3617m,5500-5606m,7730-7820m & 8477-8587m. 0.3720 42.950 Mr. Md. Enus Al Mamun 42.950 30/01/2018 100 17/04/2019
44 IRIDP-2/BHL/DW-27 (a) Improvement of Road from Golder hat–WDB Embk road (New name Golder hat-WDB embk. UZR road from ch. 1000m-2370m. (b) Construction of 01no 1.5mx1.5m culvert at ch. 2220m on the same road. c) Construction of 04nos 0.75mx0.0.75m culvert at ch.1200m, 1507m, 1610m & 1910m on the same road. 1.3700 94.860 Mr. Md. Enus Al Mamun 94.860 27/03/2017 100 17/04/2019
45 IRIDP-2/BHL/DW-26 (a) Improvement of Road from Janata Bazar Bhuiyerhat road sheky mozib Mosque korterhat hat Bazar R&H road ( New Name dularhat GC Raychand GC Road Shekh Mozib Mosque –Korter hat Bazar R&H road from ch. 00m-1350m. (b) Construction of 01no 1.5mx1.5m culvert at ch.240m on the same road. c) Construction of 02nos 0.75mx0.0.75m culvert at ch.1071m & 1269m on the same road. 1.3500 94.860 M/s. Jashim Construction 94.860 27/03/2017 100 17/04/2019
46 IRIDP-2/BHL/DW-25 (a) Improvement of Road from WFP katha road ( Ibrahaim Khalil Bari Mosjid) WDB Embk. Near Forest office via Jalil Bapari road from ch. 1400m-1592m. (b) Construction of 01no 0.75mx0.0.75m culvert at ch.1401m on the same road. 0.1920 14.890 M/s. Bokshi Enterprise 14.890 30/03/2016 100 17/04/2019
47 IRIDP-2/BHL/DW-23 (a) Improvement of Road from Awaspur 01no ward Latra khal Rohijol mal khaya ghat) west Awaspur KO Aid Schoo from ch. 950m-2170m. (b) Construction of 01no 1.5mx1.5m culvert at ch.1380m on the same road. c) Construction of 04nos 0.75mx0.0.75m culvert at ch. 1150m, 1650m, 1807m & 2062m on the same road. 1.2200 95.280 Mr. Md. Enus Al Mamun 95.280 25/01/2017 100 17/04/2019
48 IRIDP-2/BHL/DW-22 (a) Improvement of Road from Siddik Howlader Bazar (Rodderhat) –Bangla Bazar (New Name: Abubokarpur UPC- Nasir Saiyal Bari via Bangla Bazar) from ch. 1100m-2000m. (b) Construction of 02nos 1.5mx1.5m culvert at ch.1229m & 1791m on the same road. c) Construction of 05nos 0.75mx0.0.75m culvert at ch. 1314m, 1368m, 1446m, 1608m & 1680m on the same road. 0.9000 70.140 M/s. Jashim Construction 70.140 15/03/2017 100 17/04/2019
4 Daulatkhan
1 IRIDP-2/BHL/DW-162 (a) Improvement of Kalakopa Shizuddin Hazi bari more to (North direction) Moulovi shaheb bari road ( ch.00m-440m) ID No.509295119(b)Construction of 03nos 1.0mx1.0m culvert at ch.52m,150m,271m on the same road. 0.4400 43.140 M/S. Jarin & Co. 43.140 22/10/2018 90 15/04/2019
2 IRIDP-2/BHL/MW-99 Maintenance of Bhola Charfession RHD (Komaruddin) to N.E Char pata GPS. road ( Ch.00m -1545m) 1.5450 29.630 M/S. Shanto Enterprise 29.630 02/03/2017 100 15/04/2019
3 IRIDP-2/BHL/DW-33 (a) Improvement of Guinger hat WAPDA embankment (Naymuddin Hat) - Kazir hat road.(Ch.00m -2415m) (b) Construction of 03nos 1.0mx1.0m culvert at ch.310m,1370m&1985m on the same road. 2.4150 120.990 M/s. Howlader Construction 120.990 20/04/2017 100 15/04/2019
4 IRIDP-2/BHL/MW-143 Maintenance of Otaruddin RHD - Munshir hat Road (Ch.00m -1100m) ID No.509295050 1.1000 30.130 JC & EE (JV), 30.130 15/02/2018 100 15/04/2019
5 IRIDP-2/BHL/DW-142 (a) Improvement of Otaruddin RHD - Munshir hat Road (Ch.1100m -2590m) (b)Construction of 03nos 1.0mx1.0m culvert at ch.1373m,1903m,2319m on the same road. 1.4900 95.530 JC & EE (JV), 95.530 20/03/2018 100 15/04/2019
6 IRIDP-2/BHL/DW-98 (a) Improvement of Didarullah NGPS to Guingar hat-WAPDA Embankment via Didarullah siniyar madrasha road ( Ch.2760m -3760m)(b) Construction of 01 nos 1.0mx1.0m culvert at ch. 1450.0m on the same road. 1.0000 47.740 M/S. Sayem Enterprise 47.740 25/12/2017 100 15/04/2019
7 IRIDP-2/BHL/DW-97 (a) Improvement of Guinger hat WAPDA embankment ( Char pata School) - kalapul Road. ( Ch.00m -970m)(b) Construction of 02 nos 1.0mx1.0m culvert at ch. 428m & 671 on the same road. 0.9700 56.730 M/S. Sayem Enterprise 56.730 20/01/2018 100 15/04/2019
8 IRIDP-2/BHL/DW-32 Improvement of Majhir hat bridge - (west direction) Mizi bari west side(Mujib nagar hat.)( Ch.925m -1650m) 0.7250 33.070 M/s. Howlader Construction 33.070 16/08/2016 100 11/04/2019
9 IRIDP-2/BHL/DW-12 (a) Naymuddin bazaar to CONTructor bari road (Annda bazaar) road Ch. 921m-2715m. (b) Construction of 04nos 1.0mx1.0m culvert at ch. 1322, 1530m, 1879m & 2223m on the same road. 1.7940 106.870 M/s. Nobarun Traders Ltd. 106.870 24/01/2016 16/01/2017 100 23/12/2018  
5 Lalmohan
1 IRIDP-2/BHL/DW-138 (a) Improvement of Abugonj Bazar RHD- Fulbagisa Bazar , Kharakandi & Mizipara GPS-Talpata Bazar UZR (Ch.5000m -6700m) ID No.509545078(b) Construction of 01 nos 1.50mx1.50m culvert at ch. 5435m on the same road.(c) Construction of 05 nos 0.750mx0.750m culvert at ch. 5267m,5614m,6135m,6185m & 6494 on the same road. 1.7000 126.140 Md. Nazrul Islam Chunnu 126.140 29/07/2018 100 17/04/2019
2 IRIDP-2/BHL/DW-85 (a) Improvement of Dawri FWC - H/O Abdul Ali Howladar road ( Ch.00m -1800m)(b) Construction of 02 nos 1.50mx1.50m culvert at ch. 609m & 1392m on the same road.(c) Construction of 03 nos 0.75mx0.75m culvert at ch. 346m,910m & 1609m on the same road. 1.8000 96.810 MS. Hawlader Construction 96.810 30/06/2018 100 17/04/2019
3 IRIDP-2/BHL/DW-16 (a) Improvement of road from Korter hat UZR- Nutun Bazar UZR road from Ch. 00m-1200m. (b) Construction of 01no 1.5mx1.5m culvert at ch.736.0m on the same road. (c) Construction of 06nos 0.625mx0.0.60m culvert at ch. 23m, 85m, 271m, 372m, 502m & 652m on the same road. 1.2000 64.400 M/s. Bhuya Enterprise 64.400 20/04/2017 100 17/04/2019
4 IRIDP-2/BHL/MW-144 Maintenance of Mongal Skider GC -Mongol Sikder Launchghat road ( ch.00m-360m & Ch.1350m -1620m) ID No.509544030 0.6300 14.320 Md. Asadullah 14.320 20/03/2018 100 17/04/2019
5 IRIDP-2/BHL/MW-137 (a)Maintenance of Gazaria-Shashibhushan Road (Shimul Tola) - Pangasia Bazar via H/o Younus member road ( Ch.00m -1095m) ID No.509544047(b)Construction of 03 nos 0.75mx0.75m culvert at ch.460m,757m&897m on the same road. 1.0950 28.540 Md. Asadullah 28.540 29/01/2018 100 17/04/2019
6 IRIDP-2/BHL/MW-136 (a)Maintenance of UZR 3001 Hazigonj Junior H/S-Muguria Bazar via Betua River (H/o Bazlu Miah) BANGUBANDHU Sarakroad( Ch.00m -550m) ID No.509545167(b)Construction of 02 nos 0.75mx0.75m culvert at ch.100m&2360m on the same road. 0.5500 16.290 M/S. Nowrose Enterprise 16.290 20/11/2017 100 17/04/2019
7 IRIDP-2/BHL/MW-135 Maintenance of Muslim Bazar( RHD) - Janata Bazar -Bhola -Charfession RHD (Jewe Brick Filed)Road.(Ch.00-2500m) ID No.509544029 2.5000 50.910 M/s. Bhuya Enterprise 50.910 15/03/2018 100 17/04/2019
8 IRIDP-2/BHL/MW-134 Maintenance of Lalmohan H/Q (North side of college)- Badarpur UPC road ( Ch.5720m -7000m) ID No.509543008 1.2800 32.290 Md. Nazrul Islam Chunnu 32.290 27/01/2018 100 17/04/2019
9 IRIDP-2/BHL/MW-133 Maintenance of Mongol Sikder UNR- Nurullah Bazar towards South Direction (H/O Aslam) road ( Ch.00m -266m) ID No.509545222(b)Construction of 01 nos 0.75mx0.75m culvert at ch.170 on the same road. 0.2660 11.700 Md. Asadullah 11.700 28/01/2018 100 17/04/2019
10 IRIDP-2/BHL/DW-103 (a) Improvement of Nazirpur RHD (GP Tower) - Habi Hawlader Bari Vote Kendra-Nabinagar Bazar Road ( Ch.1000m -1600m)(b) Construction of 01 nos 0.75mx0.75m culvert at ch.1330 on the same road. 0.6000 36.890 M/S. Ma Moni Enterprise 36.890 28/09/2017 100 17/04/2019
11 IRIDP-2/BHL/MW-101 (a) Maintenance of Satbaria Bazar - H/O Halim Dukal (Joint Secrt.) Road ( Ch.00m -534m)(b) Construction of 01 nos 0.75mx0.75m culvert at ch.328m on the same road. 0.5340 17.650 Md. Asadullah 17.650 12/06/2017 100 17/04/2019
12 IRIDP-2/BHL/MW-100 (a) Maintenance of Debirchar – Lalmohon – Mongol Sikder RHD (Aminuddin houlader bari pucca gate) – Chandrima abason Kheaghat road ( Ch.00m -633m)(b) Construction of 02 nos 0.75mx0.75m culvert at ch. 145m & 408m on the same road. 0.6300 20.060 M/S. Ma Moni Enterprise 20.060 28/09/2017 100 16/04/2019
13 IRIDP-2/BHL/DW-89 (a) Improvement Badarpur UP Office - Nabinagar Bazar Road ( Ch.00m -1000m)(b) Construction of 04 nos 0.75mx0.75m culvert at ch. 233m,472m,747m & 895m on the same road. 6,563,486.00 7-Dec-16 6,297,393.31 12-Nov-17 1.0000 65.630 M/S. Tahura Enterprise 65.630 12/11/2017 100 16/04/2019
14 IRIDP-2/BHL/DW-88 (a) Improvement of Lalmohan H/Q (North side of college)- Badarpur UPC Road ( Ch.1300m -3050m)(b) Construction of 03 nos 1.50mx1.50m culvert at ch. 1825m,2550m & 2750m on the same road.(c) Construction of 01 nos 0.75mx0.75m culvert at ch.2140m on the same road. 1.7500 120.640 Md. Shah Jalal 120.640 26/10/2017 100 16/04/2019
15 IRIDP-2/BHL/DW-87 (a) Improvement of Badarpur DC road-Berri bandh via Melker bari road ( Ch.00m -1625m)(b) Construction of 01 nos 1.50mx1.50m culvert at ch. 320m on the same road.(c) Construction of 07 nos 0.75mx0.75m culvert at ch. 137m,415m,492m, 824m, 1130m, 1340m & 1515m on the same road. 10,596,878.00 7-Dec-16 10,593,817.02 8-Jun-17 1.6250 105.960 Md. Asadullah 105.960 08/06/2017 100 16/04/2019
16 IRIDP-2/BHL/DW-86 (a) Improvement of RHD (Dr. Azaher Uddin College) - Gazaria shashibhushan Road (Gazaria shashibhushan UZR towards east direction H/O Mostafa mall) (Ch. 00m -1967m)(b) Construction of 04 nos 0.75mx0.75m culvert at ch.219m,1062m,1140m & 1460m on the same road. 1.9700 103.560 M/S. Promee Enterprise 103.560 25/05/2017 100 16/04/2019
17 IRIDP-2/BHL/DW-82 Const of 1 no 3 x 4.0m x 4.50m Culvert on RHD ( East side of Azam road) _ Fulbagisa Road at Ch.4.00 m. 31.570 M/S. Md. Delowar Hossain 31.570 25/06/2017 100 16/04/2019
18 IRIDP-2/BHL/DW-81 Const of 1 no 3 x 4.0m x 4.50m Culvert on RHD – Sikder hat (Azam road) South side of Noboni brick field at Ch.1718 m. 30.600 M/S. Md. Delowar Hossain 30.600 25/06/2017 100 16/04/2019
19 IRIDP-2/BHL/DW-80 Const of 1 no 2 x 4.0m x 3.50m Culvert on Shikder hat-Gazaria Berri bandh Road (H/o Karim Uddin bepari Via Janota Bazer (Awlad Hossain road) near H/O Imamjan bariat Ch.1300 m. 20.520 M/S. Swa Construction 20.520 01/07/2017 100 16/04/2019
20 IRIDP-2/BHL/DW-79 Const of 1 no 2 x 4.0m x 3.50m Culvert on Mojammel Hauqe road (Didar Mosque) Towards south Direction –Pesker road infront H/O Al Islam at Ch. 4150 m. 20.660 M/S. Swa Construction 20.660 30/06/2017 100 16/04/2019
21 IRIDP-2/BHL/DW-78 Const of 1 no 2 x 4.0m x 3.50m Culvert on Horigonj-Raychand road (Matobber bari)-Miar Hat Road (altatali khal) near Moktab bazar infront H/O Amin Member/Masud batania at Ch. 2650m. 20.520 M/s. Tapu Enterprise 20.520 02/07/2017 100 16/04/2019
22 IRIDP-2/BHL/DW-77 Const of 1 no 3 x 4.0m x 4.50m Culvert on Lalmohan Chowmohoni - Balurchar Road khal beside the H/Q Hazi Toafayel miah at Ch. 1950m. 31.950 M/s. Tapu Enterprise 31.950 02/06/2018 100 16/04/2019
23 IRIDP-2/BHL/DW-59 Construction of 01no 3.0mx3.0m culvert at ch.05m on Debir char – Mojam Bazar road. 11.800 M/s. Sorkar Enterprise 11.800 30/01/2017 100 16/04/2019
24 IRIDP-2/BHL/DW-58 a)Improvement of Alam Bazar – Santir hat road (Ch. 1960m-2980m) (b) Construction of 02no 1.5mx1.50m culvert at ch.2320m& 1973m on the same road. (c) Construction of 02no 0.75mx0.75m culvert at ch.2542m&2727m on the same road. 1.0200 57.860 M/s. Akter Hossain 57.860 20/04/2017 100 16/04/2019
25 IRIDP-2/BHL/DW-57 (a)Improvement of Alam Bazar – Santir hat road (Ch. 3175m-3900m) (b) Construction of 03no 0.75mx0.75m culvert at ch.3327m ,3535m &3795m on the same road. (c) Construction of 01no 2x4.00mx3.50m culvert at ch.3180m on the same road. 0.7250 54.790 M/s. Akter Hossain 54.790 20/04/2017 100 16/04/2019
26 IRIDP-2/BHL/DW-56 (a) Construction of 01no 3x4.0mx4.50m culvert at ch.905m on the same road. (b) Construction of 01no 3.0mx3.0m culvert at ch.1900m on the same road. (c) Construction of 01no 1.50mx1.50m culvert at ch.100m on the same road. 44.330 M/s. Sorkar Enterprise 44.330 20/12/2017 100 16/04/2019
27 IRIDP-2/BHL/DW-55 (a)Improvement of Madrasha Bazer-Berri bandh Road towards Northi Road (Ch. 00-1560m.) (b) Construction of 04no 0.75mx0.75m culvert at ch.253m,419m,702m & 1137mm on the same road. 1.5600 85.230 M/s. Sufian Brothers 85.230 10/05/2017 100 16/04/2019
28 IRIDP-2/BHL/DW-54 (a)Improvement of Char Bhuta UP-Balur char BazerRoad.( Ch.1145m -3320m) (b) Construction of 09no 0.75mx0.75m culvert at ch. 1173m,1255m,1936m,2149m, 2358m,2533m,2715m,2815m & 2978mm on the same road. 2.1750 126.830 M/s. Bhuya Enterprise 126.830 18/09/2017 100 16/04/2019
29 IRIDP-2/BHL/DW-18 (a) Improvement of road from Balur Char Bhange Pole Monotazia GPS road (Lalmohon Chawmohoni–Balurchar bazar) from Ch. 375m-875m. (b) Construction of 01no 0.625mx0.6m culvert at ch.710m on the same road. 0.5000 24.340 M/s. Bhuya Enterprise 24.340 30/05/2016 100 16/04/2019
30 IRIDP-2/BHL/DW-17 (a) Improvement of road from Alam bazar (RHD) Shantir hat via Akhter Chairman bari road fromCh. 960m-1960m road (b) Construction of 03nos 0.625mx0.6m culvert at ch.1030m, 1320m & 1635m on the same road. 1.0000 48.200 M/s. Akter Hossain 48.200 22/01/2017 100 16/04/2019
31 IRIDP-2/BHL/DW-15 Improvement of road from Mongle sikder bazar Fatamabad Sulice gate bazar from ch. 13955-14350m. 0.3950 21.270 M/s. Bhuya Enterprise 21.270 02/02/2016 28/07/2016 100 23/12/2018  
32 IRIDP-2/BHL/DW-14 (a) Improvement of road from Maddha Pesker Howla GPS –Abugonj via Kisorgonj GPS from Ch. 1000m-2275m. (b) Construction of 02nos 1.5mx1.5m culvert at ch.1272m&1890m on the same road. (c) Construction of 02nos 0.625mx0.0.60m culvert at ch.1598m & 2098m on 1.2700 75.860 M/s. Jahanara Traders 75.860 02/02/2016 28/07/2016 100 23/12/2018  
33 IRIDP-2/BHL/DW-13 (a) Improvement of road from UNR-3013 (Mondon Paler Sow meal) to Ajam Road from ch. 00m-1000m. (b) Construction of 02nos 0.625mx0.6m culvert at ch.133 & 642m on the same road. 1.0000 50.840 M/s. Haider Bulders 50.840 24/01/2016 15/03/2017 100 23/12/2018  
6 Monpura
1 IRIDP-2/BHL/DW-148 Improvement of Hazirhat UP- Bhuiyanrhat Via Fakirhat road ( ch.1626m-2354m) ID No.509653001 0.7280 64.820 Nabarun Traders Limited 64.820 01/04/2018 100 18/04/2019
2 IRIDP-2/BHL/DW-147 (a)Improvement of UZR-Kulagazir Tauk GPS – Ramnawaj New Launch ghat bazar – West EMT. road ( ch.00m-668m) ID No.509654064 & Ramnawaj New Launch ghat bazar Link road 100.00m(b)Construction of 01nos 0.75mx0.75m culvert at ch.412m on the same road. 7,828,749.80 31-Jan-18 7,827,945.85 16-May-18 100% 0.7680 78.280 Nabarun Traders Limited 78.280 16/05/2018 100 18/04/2019
7 Tazumuddin
1 IIRIDP-2/BHL/DW-139 Improvement of Nakul Sarkar Shop (UZR) to RHD via Hospital Road (Ch.00m -840m) ID No.509914027 0.8400 62.400 Md. Iqbal Hossain 62.400 29/04/2018 85 17/04/2019
2 IRIDP-2/BHL/DW-102 (a) Improvement of Chandpur Bridge to Ulshi Bridge via Gosher howla road (ch. 00m-1450m) ID No. 509915033(b) Construction of 01nos 1.0mX1.0m culvert at ch. 1210m on the same road. 1.4500 99.010 M/S. Mawa Construction 99.010 08/10/2018 70 17/04/2019
3 IRIDP-2/BHL/DW-84 (a) Improvement of Sonapur Bhoya bari to Shambopur - Natun hat via Khoshnadi GPS road (Ch.00m -770m)b) Construction of 02 nos 1.0mx1.0m culvert at ch. 150m & 240mon the same road. 0.7700 47.070 M/S. Swa Construction 47.070 04/03/2018 100 16/04/2019
4 IRIDP-2/BHL/DW-83 Improvement of Aralia GPS-Thakur Bazer road (Ch.1000m -2153m) 1.1530 57.780 M/S. Swa Construction 57.780 27/02/2018 100 16/04/2019
5 IRIDP-2/BHL/DW-21 Improvement of Tafiluddin Sikder house to Shibpur Khaser hat via Sonapur UP road from ch. 00m-1180m 1.1800 53.940 M/s. Rubel Enterprise 53.940 23/07/2016 100 16/04/2019
6 IRIDP-2/BHL/DW-20 Improvement of Fakir hat to Hasan Nagor Border Road from ch. 750m-1250m. 0.5000 27.010 M/s. Rubel Enterprise 27.010 31/03/2017 100 16/04/2019
7 IRIDP-2/BHL/DW-19 (a) Improvement of LGED road (Kashem house) to Chairman bari via Nashir uddin bridge road from ch. 00m-850m. (b) Construction of 01no 1.0mx1.0m culvert at ch. 50m on the same road. 0.8500 45.820 M/s. Sirazia Enterprise 45.820 16/08/2016 100 16/04/2019
Total : 174.6260 (Km) 8549.22 (Lac) 8549.22 (Lac)