1
|
GNP-2/LAX/ SAD/16-17/ W-186
|
Improvement of Chandraganj Bazar (GC) internal road Ch. 190-510m and link 80.00m. (2nd. Phase)
|
|
72.231
|
M/S. Rahman Engineering
|
72.231
|
21/09/2017
|
10/04/2018
|
100
|
05/05/2019
|
|
2
|
GNP-2/LAX/ SAD/14-15/ W-32
|
Improvement of Mandari Bazar (GC)
|
|
40.000
|
M/S. Progati Traders
|
40.000
|
02/04/2015
|
18/01/2016
|
100
|
05/05/2019
|
|
3
|
GNP-2/LAX/ SAD/14-15/ W-31
|
Re-Construction of Chandraganj Bazar (GC) internal road Ch. 00-190m .
|
|
39.990
|
M/S. Emdad Ullah
|
39.990
|
02/04/2015
|
18/01/2016
|
100
|
05/05/2019
|
|
4
|
GNP-2/LAX/ SAD/16-17/ W-146
|
Slope protection of Yusufpur Bora-Ballabpur Mahabub member road, Road ID-451435046,
|
|
18.050
|
M/S. Khondaker Brothers
|
18.050
|
24/01/2017
|
02/11/2017
|
100
|
05/05/2019
|
|
5
|
GNP-2/LAX/ SAD/16-17/ W-145
|
Slope protection of Hazirpara UP-Charshahi UP (Nurullapur) road Ch.00-11, 142-164,240-330,353-437 & 508-595m, Road ID-451433002,
|
|
51.180
|
M/S Progati Traders
|
51.180
|
24/01/2017
|
14/11/2017
|
100
|
05/05/2019
|
|
6
|
GNP-2/LAX/ SAD/16-17/ W-129
|
Slope protection of Parbati Nagar-Sonapur Bazar-Roshidpur Bazar road (Board office road), Road ID-451433008,
|
|
21.180
|
M/S. Razu Enterprise
|
21.180
|
01/01/2017
|
17/10/2017
|
100
|
05/05/2019
|
|
7
|
GNP-2/LAX/ SAD/16-17/ W-124
|
Slope protection of Uttar Chandrapur-Dakkhin Chandrapur road, Ch.1470-1540m, Road ID-451435049,
|
|
19.040
|
Md. Shahidul Islam
|
19.040
|
10/01/2017
|
30/10/2017
|
100
|
05/05/2019
|
|
8
|
GNP-2/LAX/ SAD/16-17/ W-123
|
Slope protection of Dalal Bazar-Paler Hat road, Ch.22-42 & 285-395m, Road ID-451432010,
|
|
36.830
|
M/S. Razu Enterprise
|
36.830
|
12/01/2017
|
24/10/2017
|
100
|
05/05/2019
|
|
9
|
GNP-2/LAX/ SAD/16-17/ W-117
|
Strengthening & Widening of Bottoli-Dattapara Road. (Ch.00-1500m) Road Id-451432014 under Sadar Upazila, District: Laxmipur
|
1.5000
|
57.350
|
|
57.350
|
02/10/2016
|
19/07/2017
|
100
|
05/05/2019
|
|
10
|
GNP-2/LAX/ SAD/16-17/ W-181
|
Maintenance of Charpata UP Office to Gazi Nagar bazar road Ch. 00-1300m. ID No. 451583013. (ii) Providing 70.00m Palisading work.
|
1.3000
|
36.006
|
M/S Progoti Traders
|
36.006
|
04/05/2017
|
24/11/2017
|
100
|
05/05/2019
|
|
11
|
GNP-2/LAX/ SAD/14-15/ W-57
|
Maintenance of Tumchar Bazar-Tumchar Madrsha Road at Ch. 00-4570m Road ID-451433012
|
4.5700
|
129.590
|
M/S. Hydro Tech.
|
129.590
|
25/06/2005
|
14/04/2016
|
100
|
05/05/2019
|
|
12
|
GNP-2/LAX/ SAD/14-15/ W-21
|
Maintenance of Ayub Ali Bridge-Tumchar union road Ch. 00-2880m IDNo-451434070
|
2.8800
|
47.500
|
M/S. Ripon Enterprise
|
47.500
|
08/01/2015
|
16/04/2015
|
100
|
05/05/2019
|
|
13
|
GNP-2/LAX/ SAD/16-17/ W-144
|
Maintenance of Bahsikpur Alia Madrasha-Mandari Bazar (Oli Ullah D.C) road Ch. 00-950m, Road ID-451433007,
|
0.9500
|
15.550
|
M/S Shajahan Monir
|
15.550
|
24/01/2017
|
14/11/2017
|
100
|
05/05/2019
|
|
14
|
GNP-2/LAX/ SAD/14-15/ W-24
|
Maintenance of Bangakha UP Neyamatpur TC-Mitterhat road Ch. 00-1800m IDNo-451433013
|
1.8000
|
49.920
|
M/S. Ripon Enterprise
|
49.920
|
05/04/2015
|
21/01/2016
|
100
|
05/05/2019
|
|
15
|
GNP-2/LAX/ SAD/14-15/ W-20
|
Maintenance of Chandraganj UP Office to Chowpally UP via Kurirbari-Mostafar Dokan-Panchpara-Palpara road Ch. 00-1870m IDNo-451432005
|
1.8700
|
33.660
|
M/S. Kandakar Brothers
|
33.660
|
30/03/2015
|
21/01/2016
|
100
|
05/05/2019
|
|
16
|
GNP-2/LAX/ SAD/14-15/ W-19
|
Maintenanc of Chandraganj GC to Charshahi UP road (College road) Ch. 00-3740m IDNo-451433003
|
3.7400
|
82.420
|
M/S. Khandakar Brothers
|
82.420
|
30/03/2015
|
21/01/2016
|
100
|
05/05/2019
|
|
17
|
GNP-2/LAX/ SAD/16-17/ W-176
|
Imp. Of Basubazar to Noarhat road (Daggatoli bazar) road Ch. 1675-2545m Road ID-451433022
|
0.8700
|
52.250
|
M/S. L M Traders
|
52.250
|
11/04/2017
|
31/01/2018
|
100
|
05/05/2019
|
|
18
|
GNP-2/LAX/ SAD/16-17/ W-143
|
Improvement of Dattapara-Hanifmijir Hat-Delai Bazar road Ch. 4315-5055m, Road ID-451433006,
|
0.7400
|
34.660
|
M/S. Shahjahan Manir
|
34.660
|
24/01/2017
|
14/11/2017
|
100
|
05/05/2019
|
|
19
|
GNP-2/LAX/ SAD/16-17/ W-142
|
Improvement of Hazirpara-Dasherhat road Ch. 4538-4668m, Road ID-451433036,
|
0.1300
|
7.830
|
M/S. Raju Enterprise
|
7.830
|
24/01/2017
|
06/11/2017
|
100
|
05/05/2019
|
|
20
|
GNP-2/LAX/ SAD/16-17/ W-141
|
Improvement of Hazirpara UP-Charshahi UP (Nurullapur) Road Ch. 2410-3150m, Road ID-451433002,
|
0.7400
|
36.460
|
M/S. Sumon Enterprise
|
36.460
|
24/01/2017
|
09/11/2017
|
100
|
05/05/2019
|
|
21
|
GNP-2/LAX/ SAD/14-15/ W-46
|
Improvement of Ranirhat Bazar-Rasulganj Bazar Road at Ch. 00-1045m, Road ID-451433030.
|
1.0450
|
60.790
|
M/S. Riasat & Brothers
|
60.790
|
07/06/2015
|
03/05/2016
|
100
|
05/05/2019
|
|
22
|
GNP-2/LAX/ SAD/14-15/ W-30
|
Improvement of Mostan Mosjid-Munshirhat-Dakkhin Khidrpur-Rakhalia Bazar road Ch. 2304-4065m IDNo-451433005
|
1.7610
|
111.500
|
M/S. Riasat & Brothers
|
111.500
|
02/04/2015
|
18/01/2016
|
100
|
05/05/2019
|
|
23
|
GNP-2/LAXI/ SAD/13-14/ W-1
|
Improvement of Terobeki-Shakchar (Hazi Pana Miah Road) (Ch. 1000-1555m) (ID No-451432015)
|
0.5550
|
39.660
|
M/A. Khondaker Brothers
|
39.660
|
25/09/2014
|
15/07/2015
|
100
|
05/05/2019
|
|
24
|
GNP-2/LAXI/ SAD/15-16/ W-115
|
Impvr. Of Boshikpur chhara GPS Road from ch.00-884m, Road ID-451435241
|
0.8840
|
40.400
|
M/S Sakil Construction
|
40.400
|
22/06/2016
|
07/04/2017
|
100
|
05/05/2019
|
|
25
|
GNP-2/LAXI/ SAD/15-16/ W-89
|
Improvement of Bijoynagor-Sonapur Road (Asraf Uddin Jame Mosque Road) from Ch.00-570 m. Road ID-451435018
|
0.5700
|
26.167
|
MS Shajahan Monir
|
26.167
|
11/05/2016
|
28/02/2017
|
100
|
05/05/2019
|
|
26
|
GNP-2/LAXI/ SAD/14-15/ W-60
|
Improvement of Kashem Member House to Kusholnagar road at ch. 00-1300m Road ID No-451434256
|
1.0000
|
45.000
|
M/S Mukta Enterprise
|
45.000
|
04/11/2015
|
18/08/2016
|
100
|
05/05/2019
|
|
27
|
GNP-2/LAXI/ SAD/14-15/ W-42
|
Improvement of Char Ruhita Monir Ahmed (from Dhongazi Bari-Anu Hawlader Jame Mosjid road. west comer) ch. 1000-1710m IDNo-451434244
|
0.7100
|
34.330
|
M/S. Mishu Enterprise
|
34.330
|
02/04/2015
|
18/01/2016
|
100
|
05/05/2019
|
|
28
|
GNP-2/LAXI/ SAD/14-15/ W-41
|
Improvement of Bainna Bari-Hamchadi-Brindabon Chowdhury GPS road ch. 00-1200m IDNo-451435211
|
1.2000
|
54.670
|
M/S. Ripon Enterprise
|
54.670
|
02/04/2015
|
21/01/2016
|
100
|
05/05/2019
|
|
29
|
GNP-2/LAXI/ SAD/14-15/ W-29
|
Improvement of Mailer Matha-Mail Gate road Ch. 600-2080m IDNo-451434132
|
1.8000
|
68.360
|
M/S. Khorshed Alam
|
68.360
|
05/04/2015
|
18/01/2016
|
100
|
05/05/2019
|
|
30
|
GNP-2/LAXI/ SAD/14-15/ W-28
|
Improvement of Sonapur Aziz Ullah Master road (Start from Sonapur-Rashidpur BC road) Ch. 00-635m IDNo-451434315
|
0.6350
|
30.400
|
M/S. Jaflong Enterprise
|
30.400
|
02/04/2015
|
18/01/2016
|
100
|
05/05/2019
|
|
31
|
GNP-2/LAXI/ SAD/14-15/ W-23
|
Construction of 2x3.50mx3.50m RCC Box Culvert on Jobed Ullah Patwary Jame Mosjid road at ch. 1260m IDNo-451435389
|
|
11.880
|
M/S. Kandakar Brothers
|
11.880
|
05/04/2015
|
21/01/2016
|
100
|
05/05/2019
|
|
32
|
GNP-2/LAXI/ SAD/14-15/ W-22
|
Improvement of Jobed Ullah Patwary Jame Mosjid road (From Shadulla Miar Bridge to Bongshi road Kazi Bari) Ch. 00-1260m ID No-451435389
|
1.2600
|
58.280
|
M/S. Panjeri Enterprise
|
58.280
|
30/03/2015
|
18/01/2016
|
100
|
05/05/2019
|
|
33
|
GNP-2/LAXI/ SAD/14-15/ W-15
|
Improvement of Char Ruhita Islam Market-Ichagotemuhoni-Ranirhat-Bongshi Bridge road Ch. 3000-5800m) ID No-451434042
|
1.0000
|
44.040
|
M/S. Riasat & Brothers
|
44.040
|
02/04/2015
|
08/01/2016
|
100
|
05/05/2019
|
|
34
|
GNP-2/LAXI/ SAD/14-15/ W-10
|
Improvement of Gawchia road (from Ch. 290-990m) ID No-451434076
|
0.7000
|
33.300
|
M/A. Khondaker Brothers
|
33.300
|
27/01/2015
|
02/02/2016
|
100
|
05/05/2019
|
|
35
|
GNP-2/LAXI/ SAD/17-18/ W-215
|
(i) Improvement of Hazirpara Muktijoddha Kazi Anowarullah road Ch. 00-533m. ID No. 451435623. (ii) Construction of 2Nos U-Drain Culvert at Ch. 200m & 395m.
|
0.5330
|
30.806
|
Md. Shahidul Islam
|
30.806
|
12/03/2018
|
01/08/2018
|
40
|
05/05/2019
|
|
36
|
GNP-2/LAXI/ SAD/17-18/ W-214
|
(i) Improvement of Donnopur RGPS -Boroballabpur GPS road Ch. 00-250m. ID No: 451435347. (ii) Providing 85.00m Palisading work.
|
0.2500
|
15.777
|
M/S. Sumon Enterprise
|
15.777
|
30/01/2018
|
14/05/2018
|
100
|
05/05/2019
|
|
37
|
GNP-2/LAXI/ SAD/17-18/ W-213
|
(i) Improvement of Yusufpur Bora-Ballabpur Mahabub Member road Ch. 1900-2500m. ID No: 451435046.
(ii) Providing 50.00m Palisading work.
|
0.6000
|
30.954
|
Md. Shahidul Islam
|
30.954
|
30/01/2018
|
20/03/2018
|
65
|
05/05/2019
|
|
38
|
GNP-2/LAXI/ SAD/17-18/ W-212
|
(i) Improvement of Muktizoddha Abul Hossain road (St. RHD) Ch. 1337-2357m. ID No: 451434108.
(ii) Providing 45.00m Palisading work.
|
1.0200
|
51.022
|
M/S Riasat & Brothers
|
51.022
|
31/01/2018
|
10/07/2018
|
65
|
05/05/2019
|
|
39
|
GNP-2/LAXI/ SAD/17-18/ W-208
|
(i) Improvement of Samsu Compani bari–Chowpally bazar road Ch.00-628m & 882-1264m. ID No: 451435227. (ii) Providing 65m Palisading work.
|
1.0100
|
60.667
|
Md. Shahidul Islam
|
60.667
|
30/01/2018
|
19/07/2018
|
65
|
05/05/2019
|
|
40
|
GNP-2/LAXI/ SAD/17-18/ W-207
|
(i) Improvement of Diguli Jele Bari-Hosen Member bari-Jafapur road Ch. 500-1140m. ID No: 451435236.
(ii) Providing 89m Palisading work.
|
0.6400
|
32.657
|
Md. Shahidul Islam
|
32.657
|
30/01/2018
|
19/06/2018
|
100
|
05/05/2019
|
|
41
|
GNP-2/LAXI/ SAD/17-18/ W-206
|
(i) Improvement of Poschim Jamirtoli - Gopiar khil road (Gopair Khil - Jamirtoli Antar Sluice Gate) road Ch. 1500-2325m. ID No: 451435187. (ii) Providing 24m Palisading work.
(iii) Construction of 1No 900mmx900mm U-Drain Culvert at Ch. 1680m. (iv) Constr
|
0.8250
|
42.604
|
M/S Riasat & Brothers
|
42.604
|
29/01/2018
|
19/06/2018
|
20
|
05/05/2019
|
|
42
|
GNP-2/LAXI/ SAD/17-18/ W-205
|
(i) Improvement of Char Ruhita Islam Market-Ichagotemuhoni-Ranirhat-Bongshi Bridge road Ch. 3082-3659m & 5659-6082m. ID No: 451434042.
(ii) Providing 101m Palisading work.
|
1.0000
|
54.850
|
M/S. L M Traders
|
54.850
|
26/03/2018
|
09/11/2018
|
0
|
05/05/2019
|
|
43
|
GNP-2/LAXI/ SAD/17-18/ W-204
|
(i) Improvement of Rampur - Jagannathpur road (Rampur-Jonota college-Jaliakandi road) Ch. 00-200m & 1100-3200m. ID No: 451435125.
(ii) Providing 157m Palisading work.
|
2.3000
|
116.230
|
M/S Bonus International
|
116.230
|
29/01/2018
|
29/08/2018
|
30
|
05/05/2019
|
|
44
|
GNP-2/LAXI/ SAD/17-18/ W-203
|
(i) Improvement of Botgachtola - Kamarhat (Borobollobpur-Boraitola) road Ch. 500-1670m. ID No: 451435234. (ii) Providing 64m Palisading work. (iii) Construction of 2Nos U-Drain Culvert at Ch.1400m & 1643m.
|
1.1700
|
62.382
|
M/S. Sumon Enterprise
|
62.382
|
29/01/2018
|
14/07/2018
|
100
|
05/05/2019
|
|
45
|
GNP-2/LAXI/ SAD/17-18/ W-200
|
(i) Improvement of Chandragonj-Dasherhat (RHD)-Rajapur- Rashidpur road Ch. 00-1370m. ID No: 451435165.
(ii) Providing 155m Palisading work.
(iii) Construction of 1No U-Drain Culvert at Ch.928m.
|
1.3700
|
72.612
|
M/S. Mukta Enterprise
|
72.612
|
|
07/07/2018
|
65
|
05/05/2019
|
|
46
|
GNP-2/LAXI/ SAD/17-18/ W-199
|
(i) Improvement of Dewpara Monar Dokan - Dewpara GPS - Bismilla road Ch. 00-1090m. ID No: 451434156.
(ii) Providing 92m Palisading work.
|
1.0900
|
49.298
|
M/S Bonus International
|
49.298
|
29/01/2018
|
19/06/2018
|
65
|
05/05/2019
|
|
47
|
GNP-2/LAXI/ SAD/17-18/ W-196
|
Construction of 3x4.00mx4.00m RCC Box Culvert on Toyab Chairman bari-Dibi road (infront of Toiab Chairman bari) at Ch. 2.00m.
|
|
22.354
|
M/S Monirul Karim
|
22.354
|
21/01/2018
|
30/04/2018
|
100
|
05/05/2019
|
|
48
|
GNP-2/LAXI/ SAD/17-18/ W-195
|
(i) Improvement of Banglabazar-Daggatoli pucca road-Somitir bazar road via Ma & Shisu Hospital road Ch. 00-750m. ID No. 451434389. (ii) Construction of 2Nos U-Drain Culvert at Ch. 450m & 650m.
|
0.7500
|
42.095
|
M/S. Mukta Enterprise
|
42.095
|
06/03/2018
|
26/09/2018
|
0
|
05/05/2019
|
|
49
|
GNP-2/LAXI/ SAD/17-18/ W-194
|
(i) Improvement of Rokonpur Chowdury bari-Baitun nur Jame Mosque road Ch. 00-500m. ID No. 451434387. (ii) Providing 59.00m Palisading work.
|
0.5000
|
28.454
|
M/S. Emdad Ullah
|
28.454
|
13/01/2018
|
20/03/2018
|
100
|
05/05/2019
|
|
50
|
GNP-2/LAXI/ SAD/17-18/ W-193
|
(i) Improvement of Hazi Abdul Hoque road Ch. 00-989m. ID No. 451435380.
(ii) Providing 130.00m Palisading work.
(iii) Construction of 3Nos U-Drain Culvert at Ch.167m, 349m & 828m.
(iv) Construction of 3.00mx3.00m RCC Box Culvert at Ch. 100m.
|
0.9890
|
69.077
|
M/S Monirul Karim
|
69.077
|
21/01/2018
|
30/04/2018
|
0
|
05/05/2019
|
|
51
|
GNP-2/LAXI/ SAD/16-17/ W-192
|
(i) Improvement of Khaguria Haspatal road Ch. 1000-2092m. ID No. 451435243. (ii) Providing 36.00m Palisading work.
|
1.0920
|
57.019
|
RAB-RC (Pvt.) Ltd.
|
57.019
|
22/10/2017
|
05/07/2018
|
65
|
05/05/2019
|
|
52
|
GNP-2/LAXI/ SAD/16-17/ W-191
|
(i) Improvement of Chandragonj UP office Kuribari - Dhopaghata bridge road Ch. 53-580m. ID No. 451434089 .(ii) Providing 78.00m Palisading work.
|
0.5300
|
32.158
|
Md. Eunus & Brothers
|
32.158
|
|
|
0
|
05/05/2019
|
|
53
|
GNP-2/LAXI/ SAD/16-17/ W-190
|
(i) Improvement of Chandragonj - Shekhpur college road Ch. 00-1000m. ID No. 451435008 .(ii) Providing 150.00m Palisading work.(iii) Construction of 1No U-Drain Culvert at Ch.124m.
|
1.0000
|
62.011
|
Md. Shahidul Islam
|
62.011
|
19/10/2017
|
30/04/2018
|
100
|
05/05/2019
|
|
54
|
GNP-2/LAXI/ SAD/16-17/ W-180
|
(i) Improvement of Tatakrkhil Ayesha High School- Nozir Master road Ch. 00-930m. ID No. 451435167 .(ii) Providing 105.00m Palisading work.
|
0.9300
|
58.850
|
M/S Khandakar Brothers
|
58.850
|
04/05/2017
|
24/01/2018
|
100
|
05/05/2019
|
|
55
|
GNP-2/LAXI/ SAD/16-17/ W-179
|
Const. 39.00m RCC Girder Bridge on Nurullapur-Shankibhanga (Nurullapur WAPDA Bridge-Shankibhanga-Deghuli Bazar) road at Ch. 5m Road ID-451434236
|
|
167.920
|
Md. Eunus & Brothers
|
167.920
|
27/07/2017
|
08/08/2018
|
0
|
05/05/2019
|
|
56
|
GNP-2/LAXI/ SAD/16-17/ W-178
|
Const. 30.00m RCC Girder Bridge on Uttar Chandrapur-Dakhin Chandrapur road at Ch. 1620m Road ID-451435049
|
|
137.600
|
Md. Eunus & Brothers
|
137.600
|
27/07/2017
|
08/08/2018
|
0
|
05/05/2019
|
|
57
|
GNP-2/LAXI/ SAD/16-17/ W-177
|
Imp. Of Pukurdia Baza-Noldogi RGPS-Ahamad miat hat road Ch. 600-1000m Road ID-451434003
|
0.4000
|
23.280
|
M/S. Khorshed Alam
|
23.280
|
27/07/2017
|
08/12/2017
|
65
|
05/05/2019
|
|
58
|
GNP-2/LAXI/ SAD/16-17/ W-175
|
(i) Imp. Of Char Mondol Dadsha Miah GPS road Ch. 665-1025m (ii) Providing 37.00m Palisading work Road ID-451434281
|
0.3600
|
22.520
|
M/S. Kazi Construction
|
22.520
|
22/01/2018
|
25/01/2018
|
100
|
05/05/2019
|
|
59
|
GNP-2/LAXI/ SAD/16-17/ W-174
|
(i) Imp. Of Char Ruhita-Chowdhury Bazar -Akond Bazar road Ch. 00-1000m (ii) Providing 14.00m Palisading work (iii) Const. of 2 Nos U-Drain Culvert at Ch. 608m & 967m Road ID-451434358
|
1.0000
|
59.440
|
Md. Shahidul Islam
|
59.440
|
11/04/2017
|
23/01/2018
|
100
|
05/05/2019
|
|
60
|
GNP-2/LAXI/ SAD/16-17/ W-173
|
(i) Imp. Of East Charuboti Baitul Mamur Islamia Madrasha road Ch. 00-752m (ii) Providing 47.00m Palisading work (iii) Const. of 1 Nos U-Drain Culvert at Ch. 193m Road ID-451435483
|
0.7520
|
44.910
|
M/S. Mukta Enterprise
|
44.910
|
11/04/2017
|
24/01/2018
|
100
|
05/05/2019
|
|
61
|
GNP-2/LAXI/ SAD/16-17/ W-172
|
Imp. Of Char Mandol Dash Kandi road Ch. 00-1495m Road ID-4514350143
|
1.4950
|
87.500
|
M/S. Jaflong Enterprise
|
87.500
|
11/04/2017
|
01/02/2018
|
100
|
05/05/2019
|
|
62
|
GNP-2/LAXI/ SAD/16-17/ W-171
|
(i) Imp. Of Mohabbat Ali Hazi Bari-Serazul Hoque President Bari (Serazul Hoque President Bari road) road Ch. 00-1082m (ii) Providing 143.00m Palisading work (iii) Const. of 7 Nos U-Drain Culvert at Ch. 86m, 204m, 261m, 704m, 751, 867m & 932m (iv) Const. o
|
1.0820
|
80.370
|
M/S. Progoti Traders
|
80.370
|
11/04/2017
|
01/02/2018
|
100
|
05/05/2019
|
|
63
|
GNP-2/LAXI/ SAD/16-17/ W-170
|
(i) Imp. Of Hasondi-Somitirhat road (Rashid Contractor bari-Hosondi High School-Somitirhat road) Ch. 350-1230m (ii) Providing 19.00m Palisading work Road ID-451435017
|
0.8800
|
51.300
|
M/S. L M Traders
|
51.300
|
11/04/2017
|
30/01/2017
|
100
|
05/05/2019
|
|
64
|
GNP-2/LAXI/ SAD/16-17/ W-169
|
(i) Imp. Of Palpara Binodpur road Ch. 650-1650m (ii) Providing 50.00m Palisading work Road ID-451434031
|
1.0000
|
59.560
|
Md. Shahidul Islam
|
59.560
|
|
26/01/2018
|
100
|
05/05/2019
|
|
65
|
GNP-2/LAXI/ SAD/16-17/ W-168
|
(i) Imp. Of Baluabhangti-Doabari-Radapur-East radapur Forkania Madrasha-Boro Awlia Community Clinic road (Datta Para-Mirterhat RHD) Ch. 615-1540m (ii) Providing 52.00m Palisading work Road ID-451435424
|
0.9250
|
55.350
|
M/S. Khorshed Alam
|
55.350
|
11/04/2017
|
15/10/2017
|
100
|
05/05/2019
|
|
66
|
GNP-2/LAXI/ SAD/16-17/ W-140
|
Improvement of Kashipur Moktijoddah Abdul Latif Road (Boro aam ghach tola-Dombari road) Ch. 00m-1122.00m, Road ID-451434386,
|
1.1220
|
47.280
|
M/S. Emdad Ullah
|
47.280
|
10/01/2017
|
21/10/2017
|
100
|
05/05/2019
|
|
67
|
GNP-2/LAXI/ SAD/16-17/ W-139
|
Improvement of Hasandi-Bijoynagar Road (Bijoynagar bazaar-Hasandi road) Ch. 816.00m-1700.00m, Road ID-451435487,
|
0.8840
|
37.760
|
M/S. L M Traders
|
37.760
|
10/01/2017
|
30/10/2017
|
100
|
05/05/2019
|
|
68
|
GNP-2/LAXI/ SAD/16-17/ W-131
|
Improvement of Palpara Bazar-N. Joypur-Clinic-Hanif Miazir Hat road Ch. 00-1000m, Road ID-451435084,
|
1.0000
|
43.150
|
M/S. Sumon Enterprise
|
43.150
|
01/01/2017
|
18/10/2017
|
100
|
05/05/2019
|
|
69
|
GNP-2/LAXI/ SAD/16-17/ W-130
|
Improvement of Panch para Donkazi Patowary Mosque road Ch. 00-830m, Road ID-451435242,
|
0.8300
|
39.550
|
Md. Shahidul Islam
|
39.550
|
24/01/2017
|
09/11/2017
|
100
|
05/05/2019
|
|
70
|
GNP-2/LAXI/ SAD/16-17/ W-128
|
Improvement of Mohajan bari bridge-Motobi Ozi Ullah Bhuiyan bari road Ch. 1000-1470m, Road ID-451435568,
|
0.4700
|
22.440
|
M/S. Sumon Enterprise
|
22.440
|
01/01/2017
|
21/10/2017
|
100
|
05/05/2019
|
|
71
|
GNP-2/LAXI/ SAD/16-17/ W-127
|
Improvement of Muktizoddha Abul Hossain road Ch. 400-1337m, Road ID-451434108,
|
0.9370
|
45.170
|
M/S. Sumon Enterprise
|
45.170
|
01/01/2017
|
21/10/2017
|
100
|
05/05/2019
|
|
72
|
GNP-2/LAXI/ SAD/16-17/ W-126
|
Improvement of Chandkhali High School-Aminbazar road Ch. 00-1025m, Road ID-451435183,
|
1.0250
|
44.990
|
M/S. Sumon Enterprise
|
44.990
|
01/01/2017
|
15/10/2017
|
100
|
05/05/2019
|
|
73
|
GNP-2/LAXI/ SAD/16-17/ W-125
|
Improvement of Pachim Mandari Paler Bari-Amin bazaar road Ch. 00-950m, Road ID-451435381,
|
0.9500
|
45.000
|
M/S. Sumon Enterprise
|
45.000
|
01/01/2017
|
15/10/2017
|
100
|
05/05/2019
|
|
74
|
GNP-2/LAXI/ SAD/16-17/ W-119
|
Improvement of Mirikpur - Mokordhas RNGPS- Parbotinagor Botgach tola{ Mirikpur (Bolir Dokan)- Parboti nagor} Road. (Ch.00-1000m) Road Id-451435033 under Sadar Upazila,District: Laxmipur,
|
1.0000
|
46.220
|
M/S. Wahidul Karim
|
46.220
|
02/10/2016
|
22/07/2017
|
100
|
05/05/2019
|
|
75
|
GNP-2/LAXI/ SAD/16-17/ W-118
|
Improvement of Punianagar Mosque Road. (Ch.00-1000m) Road Id-451435281 under Sadar Upazila, District: Laxmipur
|
1.0000
|
46.000
|
M/S. Samiya Enterprise
|
46.000
|
02/10/2016
|
19/07/2017
|
100
|
05/05/2019
|
|
76
|
GNP-2/LAXI/ SAD/15-16/ W-116
|
Impvr. Of Chandrgonj - Dewpara-Panchpara-Monharpur Bazar road ch.2500-3230.00m, Road ID-451434022 W-116
|
0.7300
|
32.600
|
M/S Progati Traders
|
32.600
|
26/06/2016
|
07/04/2017
|
100
|
05/05/2019
|
|
77
|
GNP-2/LAXI/ SAD/15-16/ W-114
|
Impvr. Of Uttar Panchpara Talimul Quran Etimkhana Madrasa road from Ch.00-870m Road ID-45143 W-114
|
0.5700
|
28.670
|
M/S Shahjahan Monir
|
28.670
|
26/06/2016
|
07/04/2017
|
100
|
05/05/2019
|
|
78
|
GNP-2/LAXI/ SAD/15-16/ W-113
|
Constructin of 2x4.50x4.50 m Box Culvert on Diguli UP office-Ansar Companir Bari Road at Ch. 989m. over Diguli Katakhali Khal. Road Id-451435295
|
|
18.290
|
Md. Shahidul Islam
|
18.290
|
01/08/2016
|
18/05/2017
|
100
|
05/05/2019
|
|
79
|
GNP-2/LAXI/ SAD/15-16/ W-112
|
Construction of 3x3.00x3.00 m RCC Box Culvert on Mirikpur Muktijoddha Rafique Ullah Road at Ch. 3.00m over Darbeshpur Hatibandha Khal. Road Id-451435362
|
|
13.520
|
M/S Monirul Karim
|
13.520
|
01/08/2016
|
14/05/2017
|
100
|
05/05/2019
|
|
80
|
GNP-2/LAXI/ SAD/15-16/ W-93
|
Improvement of Impvr. Of Hazirpara - Chawpally Bazar to Monohorpur Cyclone Shelter Road ( Chawpally Bazar - Monohorpur Road) from Ch.1200 - 2000 m Road ID-451434032
|
0.8000
|
37.695
|
M/S samia Enterprise
|
37.695
|
11/05/2006
|
24/02/2017
|
100
|
05/05/2019
|
|
81
|
GNP-2/LAXI/ SAD/15-16/ W-92
|
Improvement of Rotna Gorba Khushid Ara Begum Road ( Bobanigonj- Rotna Gorba Khushid Ara Begum Road) from Ch.00-710 m Road ID-451435373
|
0.7100
|
30.328
|
M/S Riasat & Brothers
|
30.328
|
11/05/2016
|
28/02/2017
|
100
|
05/05/2019
|
|
82
|
GNP-2/LAXI/ SAD/15-16/ W-91
|
Improvement of Bobanigonj Mukti Zudda K. M. Siddiq Ullah Road (St. Boiragir Dokan RHD) from Ch. 00 to 1040m, Road ID-451434327
|
1.0400
|
44.849
|
M/S Ripon Enterprise
|
44.849
|
11/05/2016
|
19/02/2017
|
100
|
05/05/2019
|
|
83
|
GNP-2/LAXI/ SAD/15-16/ W-80
|
(A) Improvement of Diguli Jele Bari-Hosen Member Bari-Jafarpur Road By BC from Ch. 00m to 482m, Road ID-451435236 (B) Const. of 1x3.00x3.00m size Box Culvert on the Same Road
|
0.3000
|
23.935
|
M/S Salam Traders
|
23.935
|
03/05/2016
|
22/02/2017
|
100
|
05/05/2019
|
|
84
|
GNP-2/LAXI/ SAD/15-16/ W-79
|
Improvement of Jamirtoli-Rajapur Rd. By BC from Ch. 1500m to 2080m, Road ID-451435090
|
0.5800
|
27.517
|
M/S Salam Traders
|
27.517
|
24/04/2016
|
12/02/2017
|
100
|
05/05/2019
|
|
85
|
GNP-2/LAXI/ SAD/15-16/ W-77
|
Improvement of Etim Bazar - East Bijoy nagar GPS - Sonapur Bazar Road from Ch. 00m-1900m.Road Id-451435203
|
1.9000
|
84.367
|
M/S. Khondaker Brothers
|
84.367
|
23/03/2016
|
03/12/2016
|
100
|
05/05/2019
|
|
86
|
GNP-2/LAXI/ SAD/15-16/ W-76
|
Constructin of 2x4.50x4.00 m Box Culvert on Gopiar Khil - Jamirtoli Antar Pukurpar - Sluice Gate Road (Jamirtoli Road) at Ch. 3370m. Road Id-451435187
|
|
18.289
|
M/S. Hafiz & Sons
|
18.289
|
23/03/2016
|
12/01/2017
|
100
|
05/05/2019
|
|
87
|
GNP-2/LAXI/ SAD/15-16/ W-75
|
Constructin of 2x4.50x4.00 m Box Culvert on Jamirtoli-Rajapur Road at Ch. 3.00m. Over Manik Poddar Khal Road Id-451435090
|
|
16.749
|
M/S. Shajahan Monir
|
16.749
|
23/03/2016
|
04/01/2017
|
100
|
05/05/2019
|
|
88
|
GNP-2/LAXI/ SAD/15-16/ W-74
|
Constructin of 2x3.50x3.00 m Box Culvert on Gopiarkhil - Maizerbari - Antarpukur High School Road at Ch. 3.00m. Road Id-451434318
|
|
11.226
|
M/S. Shajahan Monir
|
11.226
|
23/03/2016
|
04/01/2017
|
100
|
05/05/2019
|
|
89
|
GNP-2/LAXI/ SAD/15-16/ W-73
|
Constructin of 2x4.50x4.00 m Box Culvert on Durgapur Ozi Ullah Sddar Bari - Shahid Master Road at Ch. 3.00m. Road Id-451435293
|
|
16.583
|
M/S. Shajahan Monir
|
16.583
|
23/03/2016
|
04/01/2017
|
100
|
05/05/2019
|
|
90
|
GNP-2/LAXI/ SAD/15-16/ W-71
|
Improvement of Rampur - Bhuyan Bazar - Nozir Bari) Road from Ch. 0.00m-1048m. Road Id-451435187.
|
1.0480
|
45.120
|
M/S. Sumon Enterprise
|
45.120
|
23/03/2016
|
04/01/2017
|
100
|
05/05/2019
|
|
91
|
GNP-2/LAXI/ SAD/15-16/ W-70
|
Improvement of Panchpara Besu Patwary Road (St.Kalu Master Bari- Kazi bari) Road from Ch. 0.00m-1255m. .Road Id-45143524.
|
1.2550
|
54.310
|
M/S. Khondaker Brothers
|
54.310
|
23/03/2016
|
10/01/2017
|
100
|
05/05/2019
|
|
92
|
GNP-2/LAXI/ SAD/15-16/ W-67
|
Improvement of Poschim Jamirtoli - Gopiar khil Road ( Gopair Khil - Jamirtoli Atana Sluce Gate )Road from Ch. 0.00m-500m.Road Id-451435187.
|
0.5000
|
21.420
|
M/S. R-TA Enterprise
|
21.420
|
28/01/2016
|
13/11/2016
|
100
|
05/05/2019
|
|
93
|
GNP-2/LAXI/ SAD/15-16/ W-66
|
Improvement of Durgapur Road ( Durgapur Khamar Bari Mosque road from Ch.0.00m-1000m) Road ID-451435420.
|
1.0000
|
44.050
|
Md. Shahidul Islam
|
44.050
|
03/02/2016
|
21/11/2016
|
100
|
05/05/2019
|
|
94
|
GNP-2/LAXI/ SAD/15-16/ W-65
|
Improvement of Radapur Balla Bagnti -Mizi Bari Mosque Road from Ch. 650-750m & 900-1700m. Road ID-451435455/
|
0.8500
|
35.967
|
M/S. R-TA Enterprise
|
35.967
|
28/01/2016
|
13/11/2016
|
100
|
05/05/2019
|
|
95
|
GNP-2/LAXI/ SAD/15-16/ W-64
|
Improvement of Bagbari-Mollabari-Kanu Patwarybari-Enayetpur Madrasa road at ch. 00-910m , Road ID-451435458.
|
0.9100
|
45.000
|
M/S. Khorshed Alam
|
45.000
|
18/02/2016
|
01/12/2016
|
100
|
05/05/2019
|
|
96
|
GNP-2/LAXI/ SAD/15-16/ W-63
|
Improvement of Rampur-Jagannathpur road at ch. 00-925m , Road ID-451435125.
|
0.9250
|
45.000
|
M/S. Khandakar Brothers
|
45.000
|
03/01/2016
|
19/10/2016
|
100
|
05/05/2019
|
|
97
|
GNP-2/LAXI/ SAD/15-16/ W-62
|
Improvement of Shanki Bhanga GPS-Romapur Dasherhat RHD road at ch. 00-1110m , Road ID-451435268.
|
1.1100
|
49.960
|
M/S. Sumon Enterprise
|
49.960
|
18/02/2016
|
01/12/2016
|
100
|
05/05/2019
|
|
98
|
GNP-2/LAXI/ SAD/14-15/ W-59
|
Improvement of Amani Laxmipur Lakshan Hazi Bari Road at ch. 00-450m Road ID-451434269
|
0.4500
|
21.000
|
M/S. Samiya Enterprise
|
21.000
|
10/08/2015
|
29/05/2016
|
100
|
05/05/2019
|
|
99
|
GNP-2/LAXI/ SAD/14-15/ W-58
|
Improvement of Amani Laxmipur Akmol Bhouyan Bari Onil Dr. Bari Bridge Road at ch. 00-900 Road ID-451435459
|
0.9000
|
43.500
|
M/S. Sumon Enterprise
|
43.500
|
10/08/2015
|
29/05/2016
|
100
|
05/05/2019
|
|
100
|
GNP-2/LAXI/ SAD/14-15/ W-44
|
Improvement of West Gandhabhapur Moulana Shafiullah Mosque to Bhuluar Khal Baraipur Jame Mosque Road, Road ID-451435486 .
|
1.0000
|
45.120
|
M/S. Mukta Enterprise
|
45.120
|
07/06/2015
|
24/03/2016
|
100
|
05/05/2019
|
|
101
|
GNP-2/LAXI/ SAD/14-15/ W-43
|
Improvement of Protabganj-Miah Bari-Goal Bari-Bismillah Road at Ch. 00-992m, Road ID-451435188.
|
0.9920
|
49.720
|
M/S. Sumon Enterprise
|
49.720
|
07/06/2015
|
24/06/2016
|
100
|
05/05/2019
|
|
102
|
GNP-2/LAXI/ SAD/14-15/ W-36
|
Construction of 2x3.50mx3.50m RCC Box Culvert on Mukhlesur Rahman Patway Bari road at ch. 03m over Mandari-Gondabyapur Canal IDNo-451435395
|
|
11.880
|
M/S. Jaflong Enterprise
|
11.880
|
05/04/2016
|
18/01/2016
|
100
|
05/05/2019
|
|
103
|
GNP-2/LAXI/ SAD/14-15/ W-35
|
Construction of 3x3.00mx3.00m RCC Box Culvert on Miapur Harunur Rashid Bari road at ch. 03m over Mandari-Gondabyapur Canal IDNo-451435394
|
|
13.620
|
M/S. Jaflong Enterprise
|
13.620
|
02/04/2015
|
26/01/2016
|
100
|
05/05/2019
|
|
104
|
GNP-2/LAXI/ SAD/14-15/ W-34
|
Construction of 2x3.50mx3.50m RCC Box Culvert on Mozibur Rahman Molla Bari road at ch. 03m over Mandari-Gandabyapur Canal IDNo-451435393
|
|
11.880
|
M/S. Jaflong Enterprise
|
11.880
|
02/04/2015
|
18/01/2016
|
100
|
05/05/2019
|
|
105
|
GNP-2/LAXI/ SAD/14-15/ W-33
|
Construction of 3x3.00mx3.00m RCC Box Culvert on Ikra Pre-Cadet School road at ch. 07m over Mandari-Bottali Canal IDNo-451435392
|
|
13.620
|
M/S. Jaflong Enterprise
|
13.620
|
02/04/2015
|
18/01/2016
|
100
|
05/05/2019
|
|
106
|
GNP-2/LAXI/ SAD/14-15/ W-27
|
Improvement of Nurullapur WAPDA Bridge to Shanki Bhanga road via Khamar Bari road Ch. 00-1032m IDNo-451434236
|
1.0320
|
44.220
|
M/S. Razu Enterprise
|
44.220
|
05/04/2015
|
22/01/2016
|
100
|
05/05/2019
|
|
107
|
GNP-2/LAXI/ SAD/14-15/ W-26
|
Improvement of Jaforpur-Rahimpur road Ch. 00-1045m IDNo-451435224
|
1.0450
|
47.640
|
Md. Jahangir Alam
|
47.640
|
06/05/2015
|
28/02/2016
|
100
|
05/05/2019
|
|
108
|
GNP-2/LAXI/ SAD/14-15/ W-25
|
Improvement of Uttar Hamchadi Rashid Chairman road Ch. 00-1760m IDNo-451435260
|
1.5000
|
67.030
|
M/S. Panjeri Enterprise
|
67.030
|
05/04/2015
|
18/01/2016
|
100
|
05/05/2019
|
|
109
|
GNP-2/LAXI/ SAD/14-15/ W-18
|
Improvement of Hazi Miajan Jame Mosjid road Ch. 00-800m ID No-451434110
|
0.3300
|
14.660
|
M/S. Khorshed Alam
|
14.660
|
30/03/2015
|
18/01/2016
|
100
|
05/05/2019
|
|
110
|
GNP-2/LAXI/ SAD/14-15/ W-17
|
Improvement of Changalchira-Rajamia road (Gourinagar high school road) Ch. 800-1800m) ID No-451435168
|
1.0000
|
45.000
|
M/S. Khorshed Alam
|
45.000
|
30/03/2015
|
18/01/2016
|
100
|
05/05/2019
|
|
111
|
GNP-2/LAXI/ SAD/14-15/ W-16
|
Improvement of Shanki Bhanga-Shakhawat Hossain tulu road Ch. 00-750m) ID No-451435029
|
0.7500
|
31.080
|
M/S. Sumon Enterprise
|
31.080
|
02/04/2015
|
08/01/2016
|
100
|
05/05/2019
|
|
112
|
GNP-2/LAXI/ SAD/14-15/ W-11
|
Improvement of South Radhapur-North Radhapur road (from Ch. 00-575m) ID No-451435379
|
0.5750
|
29.120
|
M/S. Mukta Enterprise
|
29.120
|
28/01/2015
|
03/12/2016
|
100
|
05/05/2019
|
|
113
|
GNP-2/LAXI/ SAD/13-14/ W-\05
|
Improvement of Uttar Chandropur Shahid A Motin Road (Hazipara Abdul Motin Road (St. RHD) (Ch. 00-850m) (ID No-451434270),
|
0.8500
|
46.340
|
M/A. Khondaker Brothers
|
46.340
|
25/09/2014
|
15/07/2015
|
100
|
05/05/2019
|
|
114
|
GNP-2/LAXI/ SAD/13-14/ W-04
|
Improvement of Monoharpur Darjipara (Dr. Anowarul Azim) Road (Ch. 00-1250m) (ID No-451435016),
|
0.9400
|
41.970
|
M/S. Sumon Enterprise
|
41.970
|
25/09/2014
|
19/07/2015
|
100
|
05/05/2019
|
|
115
|
GNP-2/LAXI/ SAD/13-14/ W-03
|
Improvement of Endurpur Botgach Tola-Kalekgonj Bazar Road (Ch. 00-1000m) (ID No-451435233)
|
1.0000
|
45.360
|
M/S. Ma Traders
|
45.360
|
25/09/2014
|
17/07/2015
|
100
|
05/05/2019
|
|
116
|
GNP-2/LAXI/ SAD/13-14/ W-02
|
Improvement of Diguli Juniar High School-WPBDA Beri Road (Diguli Juniar High School-Hawladar Bari-WPBDA Beri Road) (Ch. 00-1285m) (ID No-451435299)
|
1.0000
|
45.980
|
Md. Shahidul Islam
|
45.980
|
25/09/2014
|
16/09/2015
|
100
|
05/05/2019
|
|