Project Scheme Detail List
SL No. Package No. Name Length (Km) Allotment (Lac) Name of Contractor Contract Amount (Lac) Date of Commencement Date of Completion Physical Progress (%) Date of Progress Update Remarks
1 Agailjhara
1 BDRIDP/ BAR/AGL/ CCA-Rd/09 A Improvement of Temar Bastaila Nagar GPS-West Mollapara-Ohchiarmad Bazar. i Earthwark Ch.650m-1865m.ii Carpeting DC Ch. 650m-1865m. iii Palsading 641m.B Choto Basail Kander Bepari House to East Valukshi Bridge.Salvaged Cost Tk 37835.00i Earthwark Ch.0.00m-360m.ii Carpeting DC Ch.0.00m-360m. iii Palsading 120m. Under Agailjhara upazila District Barishal. 15112800.000 15112800.000 0 08/04/2019
2 BDRIDP/BAR/AGL/UN-RdR/02 Maintenance of Road From Basail Hat Rajihar UP-Batra Bazar viiiia Basail Pachchim Para Bazar Road at Ch 00m-1000m Agailjhara Under Agailjhara Upazila District - Barishal. 3511387.000 3511387.000 0 08/04/2019
3 BDRIDP/BAR/AGL/UN-RdR/03 Maintenance of Road From Goila UP Office to Billogram Bazar via Rajer Bari Road at Ch 00m-2000mm Agailjhara Under Agailjhara Upazila District- Barishal. 2890888.000 2890888.000 0 08/04/2019
4 BDRIDP/BAR/AGL/ UZ-RdR/04 Maintenance of Road From Nimtola RHD-Dhamura GC viaRatnapur UP Road at Ch 5265m-7383m Agailjhara Under Agailjhara Upazila District- Barishal. 2249883.000 2249883.000 0 08/04/2019 E-Tender Under Process.
5 BDRIDP/BAR/AGL/UZ-RdR/03 Maintenance of Barthi- Valiukshi-Magura Bakal Hat Roada Earthwark from Ch. 9860- 11860m.b Carpeting DC 21.3 sqm.c 12mm SC-5237.7 sqm. d Palisading Work 103.00m. Under Agailjhara Upazila District- Barishal. 1265178.000 1265178.000 0 08/04/2019 E-Tender Under Process.
6 BDRIDP/BAR/AGL/Gha/01 Construction of Ghat at Paisarhat Paschim par under Agailjhara Upazila Barisal 29.000 M/S Sharif Enterprise 29.000 29/03/2018 29/09/2018 60 08/04/2019  
7 BDRIDP/BAR/AGL/CCA-Rd/08 Improvement of road from Hazi Mokbul Sardar House via Sardar Mohabubul Alom & Sardar Harun - Jainger Gomosta House road. at Ch.00 to 208m under Agailjhara Upazila Barisal. 0.2080 21.683 M/S Sharif Enterprise 21.683 22/03/2018 22/09/2018 100 08/04/2019  
8 BDRIDP/BAR/AGL/CCA-Rd/02 Improvement of Road from Seral-Goila road viaShahid Serniabad House- Tamer Jame Mosjid (Tamer Girls High School - Seral Community Center by BC From Ch. 0.0m-975m under Agailjhara Upazila,Barisal. 0.9750 55.270 M/S Mitushi Traders 55.270 100 08/04/2019 W/O Cancel
9 BDRIDP/BAR/AGL/CCA-EW/01 Resectioning of Road from Seral-Goila road via Shahid Serniabad House-Tamer Jame Mosjid (Tamer Girls High School-Seral Community Center) by Earth at Ch. 0.00m-975m. 0.9750 3.176 Md. Babul Sikder 3.176 30/03/2017 30/04/2017 100 16/01/2019  
10     16.054 Pangkoj Joydhor LCS No-7 16.054 20/02/2015 30/04/2015 100 16/01/2019  
11 BDRIDP/BAR/AGL/UN-EW/01 Improvement of road from Goila (DR) to Teimukhi via Bakal hat & Kodaldhoa bazar road by Earth work form Ch. 11192-13954m under Agailjhara Upazila, Barisal. 2.7620 16.054 Mahim Baishnab LCS No-1 16.054 20/02/2015 30/04/2015 100 16/01/2019  
12 BDRIDP/BAR/AGL/UZ-EW/01 Improvement of road from Paisharhat GC to Shatla GC via Bagdha GC road by Earth work from Ch. 3800-5800m under Agailjhara Upazila, Barisal. 2.0000 10.918 Md. Sohrab Howlader LCS No-1 10.918 20/02/2015 30/04/2015 100 16/01/2019 Final
13 BDRIDP/BAR/AGL/CCA-EW/03 Resectioning of road from Temar Bastala to Hawla Bridge via Nagar GPS-Talbazar-lichermath Bazar road from Ch. 3840-4840m. 1.0000 3.446 Nolini Halder LCS No-1 3.446 15/01/2017 30/04/2017 100 16/01/2019  
14 BDRIDP/BAR/AGL/CCA-EW/02 Improvement of road from Ashkor Puraton Kalibari Baily Bridge to Kishore Bissas’s House by Earth work from Ch. 00-1200m under Agailjhara Upazila, Barisal. 1.2000 4.486 Abdul Hakim Molla LCS No-1 4.486 30/04/2015 100 16/01/2019  
15 BDRIDP/BAR/AGL/CCA-Rd/ 02 Improvement of road from Seral - Goila road via Shahid Serniabad House - Tamer Jame Mosjid(Tamer Girls High School-Seral Community Center) by BC (Ch.0.0 - 975m) under Agailjhara Upazila,Barisal. 0.9750 72.325 M/S Serniabad Traders 72.325 16/03/2017 16/10/2017 100 16/01/2019 Final
16 BDRIDP/BAR/AGL/CCA-Rd/07 Improvement of road from Biplob Serniabad House to Hazi Musa House road By BC from ch.00-400m. 0.4000 19.170 M/S Serniabad Enterprise 19.170 100 16/01/2019 Final
17 BDRIDP/BAR/AGL/UZ-Rd(R)/01 Rehabilitation of Barthi - Valukshi - Magura- Ambari-Bakalhat road by BC at ch.5870-7880m. 2.0100 127.469 M/S Santu Traders 127.469 15/07/2015 14/07/2016 100 16/01/2019 Final
18 BDRIDP/BAR/AGL/CCA-Rd(R)/05 Rehabilitation of road from Ashkor Puraton Kalibari Baily Bridge to Kishore Bissas's house road from Ch. 0.00m-1200m. 1.2000 41.592 M/S Helal Traders 41.592 100 16/01/2019  
19 BDRIDP/BAR/AGL/CCA-Rd/04 Improvement of road from Poiser hat GC-Ramshil Bazar via Trimukhi road by BC from Ch. 0.00m-1000m. 1.0000 49.262 M/S Shafique Brothers 49.262 28/05/2015 28/11/2015 100 16/01/2019 Final
20 BDRIDP/BAR/AGL/CCA-Rd/03 Improvement of road from Boro Magra Sluice to Ramshil Bazar via Kodaldhoa road by BC from Ch. 0.00m-1000m with on Boromagra Stuice to Ramshil Bazar via Dodaldhoa road from Ch. 280m 1.0000 60.171 M/S Sarniabad Enterprise 60.171 100 16/01/2019 Final
21 BDRIDP/BAR/AGL/UZ-Rd/02 Improvement of road from Paisharhat GC to Shatla GC via Bagdha GC road by BC from Ch. 3800m-5800m. 2.0000 107.712 M/S Sraboni Construction 107.712 100 16/01/2019 Final
22 BDRIDP/BAR/AGL/UN-Rd(R)/01 Rehabilitation of road from Goila (DR) to Teimukhi via Bakal hat & Kodaldhoa bazar road by BC form Ch. 11192m-13954m. 2.7620 147.393 M/S Sharif Enterprise 147.393 30/05/2015 100 16/01/2019  
23 BDRIDP/BAR/AGL/CCA-St/01 Construction of road from 2 vent 4.00m×4.00m RCC Box Culvert on Ashkor Puraton Kalibari Baily Bridge to Kishore Bissas's house road at Ch. 841m with Dranage Culvert at Ch. 930m. 16.776 M/S Sharif Enterprise 16.776 100 16/01/2019 Final
24 BDRIDP/BAR/AGL/CCA-Rd(R)/06 Rehabilitation of road from Temar Bastala to Hawla bridge via Nagar GPS-Talbazar-Oichermath bazar road by BC from Ch. 3840m-4840m with 3 Nos U-Drain at Ch. 4410m, 4590m & 4740m. 1.0000 49.140 M/S Sharif Enterprise 49.140 29/04/2015 28/01/2016 100 16/01/2019 Final
25 BDRIDP/BAR /AGL/CCA-Rd/01 Improvement of Road by BC from Rathkhola Bazar-Bhadrapara Road (ch. 0m-1000m) Under Agailjhara Upazila, District-Barisal. 1.0000 50.976 M/S Talukder Enterprise 50.976 30/10/2014 30/04/2015 100 16/01/2019 Final
2 Babuganj
1 BDRIDP/ BAR/BAB/ CCA-Rd/09 Improvement of from Khudrokathi Freedom Fighter Mogibor Rahaman Sikder House to Baige Comander Abdul Mojid Khan house. At Ch. 00m-1100m.Salvaged Cost Tk 285357.00i Earthwark Ch.0.00m-1100m.ii Carpeting DC Ch.0.00m-1100m. iii Construction of 02 Nos 0.625mx0.600m U-Drain. at Ch.110m & 400m.iv Palsading 46m.Under Babuganj Upazila Barishal District. 7945251.000 7945251.000 0 08/04/2019 E-Tender Under Process.
2 BDRIDP/ BAR/BAB/ CCA-Rd/08 Improvement of Road from Ramjankathi GPS to Charalgi GPS. a Earthwark from Ch. 0- 1500m.b Carpeting DC from Ch. 0- 1500m.c Construction of 2 Nos 625mmx600mm U-Drain at Ch. 736m & 1285m.d Palisading Work 150.00m. Under Babuganj District- Barishal. 11562581.000 11562581.000 0 08/04/2019 E-Tender Under Process.
3 BDRIDP/BAR/BAB/CCA-EW/04 Improvement of road From Daroger hat to Shandha river bank via Battala Bazar road by Earth work from Ch. 0.00m-3900m. 3.9000 3.548 Md. Kabir SikderLCS No-1 3.548 15/05/2015 30/09/2015 100 08/04/2019  
4 BDRIDP/BAR/BAB/CCA-Ew/03 Improvement of road Jayinpur madrasha to Dhaka Barisal RHD via Molla Bari by Earth Work under Dehergothi UP at Ch. 0.00m-2+600km. 2.6000 3.005 Md. Liton HossainLCS No-1 3.005 15/05/2015 30/09/2015 100 08/04/2019  
5 BDRIDP/BAR/BAB/CCA-Ew/02 Improvement of road Dehergothi in High School-Rahamotpur Krishi College via Khalik member's house by Earth Work under Dehergothi UP at Ch. 0.00m-4+320km. 4.3200 3.810 Rajib HossainLCS No-1 3.810 15/05/2015 30/09/2015 80 08/04/2019  
6 BDRIDP/BAR/BAB/CCA-Ew/01 Improvement of road Shajahan Sikder Farm to Najam Mridha House via Idel Kathi High School By Earth Work under Dehergothi UP at Ch. 0.00m-2+350km. 2.3500 2.851 TaslimaLCS No-1 2.851 15/05/2015 30/09/2015 100 08/04/2019  
7 BDRIDP/BAR/BAB/UN-Ew/01 Improvement of road from Dehergothi UP office to Kalir Bazar road by Earth Work from Ch. 1960m-3710m. 1.7500 1.958 Md. Masum Hossain GaziLCS No-1 1.958 15/05/2015 30/09/2015 100 08/04/2019  
8 BDRIDP/BAR/BAB/CCA-Rd/07 Improvement of road from Jahapur Shilondia Bridge -Uttor Mujafforpur Peda Master bari under Jahangir Nagar Union a Bituminous Surfacing -wearing courseDC ch.190m -1190m b 1No. 2.0m x 2.0m & 1No.1.0m x1.0m RCC Box Culvert at Ch.273m & 615m under Babuganj U 1.0000 69.552 M/S Amir Engineering Corporation 69.552 100 08/04/2019  
9 BDRIDP/BAR/BAB/CCA-RdR/06 Improvement of Road from Telerchar GPS -Najamrari Bari - Jahungirnagar UP road Start ch.1700m Satter Mirar Bari -Thakur. From Ch.0.0m - 550mSalvaged Cost Tk 192766.00 35.076 M/S Niaz Traders 35.076 18/01/2018 18/07/2018 50 08/04/2019  
10 BDRIDP/BAR/BAB/UN-EW/02 Resectioning of Road from Agorpur UP Office (Chairman Hat) to Miar Hat via Jahapur under Jahangirnagor (Agorpur) UP at Ch. 0.00m-2110m 2.1100 2.906 Md. Habibur Rohman LCS No-1 2.906 20/06/2016 20/10/2016 100 16/01/2019  
11 BDRIDP/BAR/BAB/UN-St/02 Construction of No 6.00m Span OFC, 3 Nos 2.00m×2.00m & 2 Nos 1.60m×1.60m RCC Box Culvert on Road From Agorpur UP Office (Chairman Hat) to Miar Hat via Jahapur under Jahangirnagor (Agorpur) UP at Ch. 0.00m, 0.00m, 125m, 1101m, 1907m & 708m. 41.829 M/S Saifuddin Traders 41.829 20/11/2016 19/09/2017 100 16/01/2019 Final
12 BDRIDP/BAR/BAB/UN-RD/02 Improvement of Road from Agorpur UP Office (Chairman Hat) to Miar Hat via Jahapur under Jahangirnagor (Agorpur) UP at Ch. 0.00m-2110m 2.1100 124.213 M/S Hasan Construction 124.213 29/11/2016 28/06/2017 100 16/01/2019 Final
13 BDRIDP/BAR/BAB/CCA-Rd/05 Improvement of road from Daroger hat to Shandha river bank via Battala bazar road By BC from Ch. 00-3800m under Babuganj Upazila, Barisal District. 3.8000 143.083 M/S Atique Construction 143.083 100 16/01/2019 Final
14 BDRIDP/BAR/BAB/UN-Rd(R)/01 Rehabilitation of road from Dehergothi UP office to Kalir Bazar by BC from Ch. 1930m-3710m. 1.7800 64.572 M/S Alvi Construction 64.572 100 16/01/2019 Final
15 BDRIDP/BAR/BAB/UN-St/01 Construction of 2 Nos 2.00×2.00m 1 No 1.60m×1.60m 1No 1.00m×1.00m RCC Box Culvert on Dehergothi UP office to Kalir Bazar road at Ch. 2475m, 2693m, 2860m & 3035m. 14.433 M/S Lutful Kobir 14.433 25/10/2015 100 16/01/2019 Final
16 BDRIDP/BAR/BAB/CCA-St/04 Construction of 3.00m×3.00m 3 Nos 1.00m×1.00m 1Nos 2.00m×2.00m RCC Box Culvert on Daroger hat to Shandha river bank via Battala Bazar road at Ch. 33m, 2820m, 2980m, 3155m & 1785m. 19.824 M/S Atique Construction 19.824 100 16/01/2019  
17 BDRIDP/BAR/BAB/CCA-St/03 Construction of 5Nos RCC Box Culvert on road Jayipuri Madrasha to Dhaka Barisal RHD via Molla Bari Under Dehergothi UP at Ch. 1135m, 1612m, 2272m, 2375m, 2540m. 20.010 M/S Atique Construction 20.010 100 16/01/2019  
18 BDRIDP/BAR/BAB/CCA-St/02 Construction of 11Nos RCC Box Culvert on road from Dehergothi in High school-Rahamotpur Krishi College via Khalik member's house under Dehergothi UP at Ch. 797m, 1455m, 1602m, 1875m, 1965m, 2362m, 2535m, 2655m, 4140m & Link road 2250m & 380m. 47.443 M/S Atique Construction 47.443 100 16/01/2019  
19 BDRIDP/BAR/BAB/CCA-St/01 Construction of 4Nos RCC Box Culvert on road Shajahan Sikder Farm to Najam Mridha House via Idel Kathi High School Under Dehergothi UP at Ch 248m, 715m, 1414m & 1543m. 29.317 M/S Atique Construction 29.317 100 16/01/2019 715wgt †PB‡b‡R KvR Kiv hv‡e bv|
20 BDRIDP/BAR/BABU/CCA-Rd/04 Improvement of road Jayinpur Madrasha to Dhaka Barisal RHD via Molla Bari by Carpeting under dehergoti UP at Ch. 00-2+600km. 2.6000 99.594 M/S Atique Construction 99.594 100 16/01/2019 Final
21 BDRIDP/BAR/BAB/CCA-Rd(R)/03 Rehabilitation of road Dehergothi in High School-Rahamotpur Krishi College via Khalik member's house by Carpeting under Dehergoti UP at Ch. 00m-4+320km 4.3200 185.184 M/S Atique Construction 185.184 100 16/01/2019 Final
22 BDRIDP/BAR/BAB/CCA-Rd(R)/02 Rehabilitation of road Shajahan Sikder Farm to Najam Mridha House via idel Kathi High School by Carpeting under dehergothi UP at Ch 00-2+350km. 2.3500 97.188 M/S Atique Construction 97.188 100 16/01/2019 Final
23 BDRIDP/BAR/BABU/CCA-Rd/01 Improvement of road from Babugonj Agorpur GC to Mr. Younusur Rahman (Divisional Commissioner) house via Clubgonj hat by Carpeting from Ch. 750-1400m & 0.00-1550m. 0.8000 97.923 M/S Lutful Kobir 97.923 17/07/2014 16/04/2015 100 16/01/2019 Final
3 Bakerganj
1 BDRIDP/BAR/BAK/UN-EW/01 Improvement of road from Kalaskati UP Office (Vumi Office) to Arshed Khaya Ghat via Kumarbari Bridge & Bagdia Govt. Pry. Schoo. Road by Earth Filling Work at Ch. 00m-4870m. 4.8700 2228745.000 2228745.000 100 08/04/2019
2 BDRIDP/ BAR/BAK/ CCA-Rd/18 Improvement of Road UZR Rabipur GPS UNR Younous Sharif Bari Via Rabipur. Salvaged Cost Tk 641271.00i Earthwark Ch.0.00m-500m. ii Carpeting DC Ch.0.00m-500m. iii Palsading 50m. Under Bakergonj Upazila Barishal District. 3691293.000 3691293.000 0 08/04/2019
3 BDRIDP/BAR/BAK/CCA-Rd/17 Part A Improvement of road from Padrishibpur GPSUZR to Bismillah Bazar via Sikder Bari Kowabunia khal & Dhulal sadu Bari Salvaged Cost Tk 921459.76i Earthwark Ch.0.0m-900m. ii Carpeting DC Ch. 0.0 - 900m. iii Construction of 01 No 2.0 m x 2.0m RCC Box Culvert & 1No.U-Drain at Ch 482m.& 28m iv Palsading 59m.Under Bakergonj Upazila District Barishal. Part B Improvement of road from East side of Bangla bazar Box Culvert to Wapder Khal Ghorar Bridge Bothra via Biharipur Madrasha road. i Earthwark Ch.3250m-3850m. ii Carpeting DC Ch.3250m-3850m. iii Construction of 01 No 2.0 m x 2.0m RCC Box Culvert at Ch.3255m & 01 No 1.6 m x 1.6m RCC Box Culvert at Ch.3716m iv Palsading 28m.Under Bakergonj Upazila District Barishal.Part C Improvement of road from Padrishibpur Sunddartala Baily Bridge UZR to Aowal Sikderbari i Earthwark Ch.0.0m-500m. ii Carpeting DC Ch. 0.0 - 500m. Under Bakergonj Upazila District Barishal. 1.9000 16443000.000 16443000.000 0 08/04/2019
4 BDRIDP/BAR/BAK/CCA-Rd/16 Part A Improvement of road from H/O Sujauddin Halta F.H. high School. Halta Mouza Sholoshath to Surath Memorial GPS. i Earthwark Ch.0.00m-850m. ii Carpeting DC Ch.0.00m-850m. iii Construction of 02 Nos RCC Culvert1.6mx1.6m at Ch 4m845m 3 Nos U-Drain 0.9mx0.9m at Ch.120m190m235m.iv Palsading 96mPart B Improvement of road from Mokimabad Bajar S/Side of Culvert to East Side of BIP Siuce Get via Dilip Master Bari.Oza Bari to Thakur Bari via Naboraz Biswas bari i Earthwark Ch.2500m-3250m. ii Carpeting DC Ch. 2500m-3250m. iii Construction of 01 No RCC Culvert 1.6mx1.6m at Ch 3125m.iv Palsading 38m.Under Bakergonj Upazila District Barishal. 0.7500 14776000.000 14776000.000 0 08/04/2019
5 BDRIDP/BAR/BAK/CCA-Rd/15 Improvement of road East Bathsala UZR to Dhulia River Bank via Bathsala Karikornagar GPS infront of Amir Khan Bari Mosque Salvaged Cost Tk 331586.00 i Earthwark Ch.0.00m-1450m. ii Carpeting DC Ch.0.00m-1450m. iii Construction of 01 No U-Drain 0.9mx0.9m at Ch.1250m.iv Palasading 79m. Under Bakergonj Upazila Barishal District. 1.4500 10466500.000 10466500.000 0 08/04/2019 Ternder Process
6 BDRIDP/BAR/BAK/CCA-Rd/14 A Improvement of road from Rabipur Ali Hossain Khan Bari UZR to Sharif Bari via Ayeb Boyati Bari i Earthwork Ch.0.0m-500m ii CarpetingDC Ch.0.0 - 500m.iii Palisading work-50m B Improvement of road from S/Side of Kabai HatNear Chunakhali Sluice Get to E/S of Pearpur Iron BridgeUZR via Chunakhali HatDhola Madrasa & Dhola Sluice Get i Earthwork Ch.4000m-5000m ii Carpeting DC Ch.4000m-5000m iii Construction of 2Nos 1.0m x 1.0m Box Culvert at Ch.4666m 4951m & 1No. U-Drain at Ch.4830m iv Palisading work-55m Under Bakergonj Upazila Barishal District 2.0000 11940345.810 11940345.810 0 08/04/2019 Tender Process
7 BDRIDP/BAR/BAK/CCA-Rd/13 Improvement of Road from Kabai Dhola Riazuddin Madrasha to Khodaboxkati Govt. Pry. School by BC work at Ch.00m-500 with 1 No. 900mx900m U-Drain. Under Bakerganj Upazila District- Barishal. 0.5000 3857006.710 3857006.710 0 08/04/2019 Tender Process
8 BDRIDP/BAR/BAK/CCA-Rd/12 Improvement of road from Kabiraj Altaf Chairman Bari near Madrasha to East Dhudal Community Pry School via Shahajahan Howlader & Alomgir Mollik Bari road by BC Ch. 736m-2000m. Under Bakerganj Upazila District- Barishal. 1.2640 8566686.780 8566686.780 0 08/04/2019 Tender Process
9 BDRIDP/BAR/BAK/CCA-Rd/11 Improvement of Road from Goma Amtala to Chatra Hat via Gajir Hat DKP High School & Sowdakar Bari Road by BC at Ch. 1600m-2100. Effective Length 500m.Under Bakerganj Upazila District- Barishal. 0.5000 3243472.300 3243472.300 0 07/04/2019
10 BDRIDP/BAR/BAK/CCA-RdR/10 Improvement of Road from Hanua UP Office Bridge to Sarder Bari Foot Bridge via Jainpuri Khanka Sarif Bari & Khodaboxkati Eshak Member Bari Char a Earth work at Ch.0.0 - 2000m b CarpettingBC Ch.0.0 -2000m c Construction of 1 No Box culvert 1.0m x 1.0m at ch.1310m d Protective worksPalisading 60m under Bakergonj UpazilaBarishal District. Salvaged Cost TK.1943192.00 2.0000 14520624.670 M/S Sikder Enterprise 14520624.670 15 07/04/2019
11 BDRIDP/BAR/BAK/UZ-St/01 Construction of 23.00m Long RCC Girder Bridge over road from Kamarkali GC to Baharchar GC via Sarsi Pollice Farry Patkati L/G Faridpur UP Office & Janota Bajarat at Ch. 5847m Under Bakerganj Upazila District Barisal Road ID 506072012 13048406.720 M/S SUN TRADERS 13048406.720 23/08/2018 04/08/2019 80 07/04/2019
12 BDRIDP/BAR/BAK/Gha/01 Construction of Ghatla at Kaligonj Bazar Khal under Bakergonj Upazila Barisal . 19.333 M/S S H Enterprise 19.333 40 07/04/2019  
13 BDRIDP/BAR/BAK/UZ-Rd/01 Improvement of Rahamgonj RHD via Dhokati GPS & Bakergonj-Sampur Road to BoaliaGC Bakergonj-Sampur Road Mill Ghar to Auliapur Dargabari RHD-Sampur Road Howlader Bari Trimohini a Earth work at Ch.1913-2775mb CarpetingBC at Ch.1913-2775mc Construction of 1No 0.8620 85.830 M/s Kazi Holdings 85.830 90 07/04/2019  
14 BDRIDP/BAR/BAK/CCA-Rd/09 Improvement of Aulia DargabariRHD to Shyampur Hat via Dhokati Madrasha & Dhokati Govt.Pry.school Auliapur Dargabari RHD-Sampur Road Howlader Bari Trimohini to Syampur Hat via Ali Khan Bari a Earth work at Ch.4500-6000m b Carpeting BC at Ch.4500 - 6000m c 1.5000 147.915 Md. Nasir Uddin 147.915 100 07/04/2019  
15 BDRIDP/BAR/BAK/CCA-Rd/07 Improvement of road from Sampur Ray Barir Culvert to Birangal Digirpar Kader Hohlade Bari via Karim Gaji Bari a Earth work 0.0 - 1500m b Bituminous Surfacing - wearing course DC 0.0m - 1500m c 1.5 m x 1.5m RCC Box Culvert at Ch.900m 1.5000 91.259 M/S Abul Kalam Azad 91.259 29/01/2018 29/10/2018 60 07/04/2019  
16 BDRIDP/BAR/BAK/CCA-Rd(R)/05 Improvement of road from ATIMKHANA to Bothra Road via Mr. Matiur Rahman (ASP) at Ch. 0.00m-500.00m (Efective Length= 475.00m) (ID No.506074225) under Bakergonj Upazila, Dist : Barisal [Salvaged cost : Tk1049647.00] 0.5000 33.048 M/S Osin Enterprise 33.048 24/01/2018 24/05/2018 100 07/04/2019  
17 BDRIDP/BAR/BAK/CCA-Rd/04 Improvement of road from west Faridpur Ajgor Sikder Bari to DC road Ferry-ghat via H/O Rahim Mrida Road, a Earth Work from Ch. 0.0 - 1300.00m. b Bituminus Carpeting from Ch. 0.0 - 1300m c Construction of 1 No. 4.0m x 4.0m RCC Box Culvert at Ch. 425m. unde 1.3000 99.940 M/S Islam Brothers 99.940 100 07/04/2019  
18 BDRIDP/BAR/BAK/CCA-Rd/03 Improvement of Dudhalmou Ferryghat(RHD) to Kanki Govt.Pry.School Road by Earth Work and HBB under Bakergonj Upazila, District -Barisal. 176.416 Md. Sumsudhoa Mollick 176.416 28/12/2016 27/06/2017 100 07/04/2019  
19 BDRIDP/BAR/BAK/UN-Rd(R)/01 Rehabilitation of Road from Kalaskati UP Office (Vumi Office) to Arshed Khayaghat via Kumarbari Bridge & Bagdia GPS road By BC from Ch. 00-1000m. (Salvage Cost Tk. 9,46,801.00) e-ID : 22666 45.669 M/S Khondokear Brothers 45.669 28/07/2015 27/04/2016 75 07/04/2019  
20 BDRIDP/BAR/BAK/CCA-Rd/01 Improvement of road from South side Dhola Sluice Gate to Alim Meridha Bari (Vary) via Sikder Bari, Manik Member Bari, Shatghor & Mannan Princhpal Bari (East side of Hanua Bridge to Shatghor via Shikder Bari) By HBB from Ch. 0.00-1013m. 1.0130 35.585 M/S Nahid Enterprise 35.585 24/07/2014 24/01/2015 100 07/04/2019 Final
21 BDRIDP/BAR/BAK/CCA-Rd/08 Improvement of Extended Portion of Dudhalmou Ferryghat (RHD) to Kanki Govt. Pry. School Road (Connecting Road Sheikh Hasina Cantonment). 43.328 M/S Amir Engineering Corporation 43.328 20/01/2018 15/02/2018 100 16/01/2019 Final
22 BDRIDP/BAR/BAK/CCA-Rd/06 Improvement of road from Shashi Bazar Bridge-Telani Lunch Ghat Najrul Talukder Bari. under Bakergonj Upazila Dist:Barisal. a) HBB from Ch. 00m-1000m b) Protection Work 108m c) Earth work from Ch. 00m-1000m 1.0000 46.094 Md. Zakir Hossain Mia 46.094 24/01/2018 24/07/2018 100 16/01/2019  
23 BDRIDP/BAR/BAK/UN-Rd/03 Improvement of road from Faridpur Hat Kheya Ghat Durgapasa UP office Gobindapur Bothtala via Kakordha Bazar Road, a Earth Work from Ch. 4860m 7320m.b Bituminus Carpeting from Ch. 4860m 7470m.c Construction of 1 No. 1.60mx1.60m RCC Box Culvert at Ch. 7435 2.4600 164.597 Md Mafuz Khan 164.597 30/11/2018 100 16/01/2019  
24 BDRIDP/BAR/BAK/CCA-Rd(R)/02 Rehabilitation of road from Gavikola Mannan Sikder Bari Foot Bridge to West side of Nilganj Foot Bridge via Moksad Khan,Kumarghudi & Kaptain Saye Bari by BC from Ch.00-810m [Salvaged Value Tk.10,53,654.00] e-ID : 29366 0.8100 35.539 Md. Nasir Uddin 35.539 100 16/01/2019 Final
25 BDRIDP/BAR/BAK/UN-Rd(R)/02 Improvement of road from Kalaskati UP Office (Vumi Office) to Arshed Khayaghat via Kumarbari Bridge & Bagdia GPS road By BC from Ch. 1000m-4870m. e-ID : 22667 180.931 M/S Khondokear Brothers 180.931 100 16/01/2019 Final
26 BDRIDP/BAR/BAK/UN-St/01 Construction of RCC Box Culvert over road from Kaloskati UP Office (Vumi Office) to Arshed Khayaghat via Kumarbari Bridge & Bagdia GPS with 7 Nos. 1.60mx1.60m at Ch. 850m, 1110m, 1456m, 1608m, 2507m, 3520m, 4245m & 2 Nos. 2vent 4.00mx4.00m at Ch. 1242m & 73.396 M/S Khondokear Brothers 73.396 21/06/2015 20/06/2016 100 16/01/2019 Final
4 Banaripara
1 BDRIDP/ BAR/BAN/ CCA-Rd/01 Improvement of road by BC Gordder Abu Taher Shop to Kachua Madrasha. Salvaged Cost Tk 448135.00i Earthwark Ch.600m-1600m. ii Carpeting DC Ch.600m-1600m. iii Construction of 03 Nos. 1.5mx1.5m Box Culvert at Ch.667m742m & 938m & U-Drain 0.6mx0.6m at Ch.870m973m & 1550m. under Banaripara UpazilaBarishal District 8974998.000 8974998.000 0 08/04/2019 E-Tender Under Process.
2 BDRIDP/BAR/BAN/UZ-EW/01 Resectioning of Banaripara-Harta Road at Ch. 4665m-6066m. 1.4010 4.418 Zakir HossainLCS No: 1 4.418 30/03/2017 100 08/04/2019  
3 BDRIDP/BAR/BAN/Gha/01 Construction of RCC Ghat at Mohish Katakhali Kheya Ghat under Banaripara Upazila Barisal . 29.119 M/S Amir Engineering Corporation 29.119 20 08/04/2019  
4 BDRIDP/BAR/BAN/UZ-St/03 Construction of 15.00m RCC Girder Bridge on Banaripara to Harta road at ch.7162 km over Onil Ghat Khal under Banaripara UpazilaBarisal District 98.143 Md Mahfuz Khan 98.143 70 08/04/2019  
5 BDRIDP/BAR/BAN/UZ-St/02 Construction of 15.00m RCC Girder Bridge on Banaripara to Harta road at ch.8642km over B.Bari Khal under Banaripara UpazilaBarisal District 118.501 Md Mahfuz Khan 118.501 90 08/04/2019  
6 BDRIDP/BAR/BAN/UZ-St/01 Construction of 1No.2.0m x 2.0m ,1 No.3.0m x 3.0m , 2Nos.4.0m x 4.0m , 1No.1.0m x 1.0m RCC Box Culvert & 3 Nos 0.625m x 0.625m U-Drain at Ch.5950m, 6787m, 6145m, 6230m, 6407m, 5871m, 6555m & 6622m on Banaripara-Harta Road. 75.315 M/S Soma Enterprise 75.315 100 08/04/2019  
7 BDRIDP/BAR/BAN/UZ-Rd/01 Improvement of road from Banaripara - Harta, At Ch.5865 -6865m under Banaripara Upazila, District Barisal. 1.0000 70.137 M/S Saleha Enterprise 70.137 50 08/04/2019  
5 Barishal-s
1 BDRIDP/BAR/SDW/UZ-Ew/01 Resectioning of Shehaber Hat-Singherkati Chandramohon Road at Ch. 1009m-1309m 12.0870 3.557 LCS No-2 3.557 100 07/04/2019 Final
2 BDRIDP/BAR/SDR/CCA-EW/04 Resectioning of Road from Shaheber Hat to Bairagibari via Gourchandar Bridge (Bisharad GPS cum CS) at Ch. 2557m-3280m. 4.0900 7.517 Md. Hemayet HowladerLCS No-1Md. Mojibor Rohman SikderLCS No-2Mosharof Hossain ShikderLCS No-3 7.517 28/03/2017 30/04/2017 70 07/04/2019 10 % 100% 100%
3 BDRIDP/BAR/SDR/CCA-RdR/14 Improvement of Shibpasha Sarder bari-Sholna Tarunclub road a Earth work at Ch.1505-2392m b Carpetting BC Ch.1505 -2392m c Construction of 1 No Double vent Box culvert 4.0m x 4.0m at ch.1901m d Protective worksPalisading 134m e Link Road Baitul Mamur Jame 0.8240 101.119   101.119 0 07/04/2019 E-Tender Under Process.
4 BDRIDP/BAR/SDR/CCA-Rd/13 Improvement of Shibpasha Sarder bari Sholna Tarunclub Road Road Part-A Earth work at Ch. 0.00 -1505.00m Part-B Carpeting BC work at Ch. 0.00-1505.00m Salvage Amount Tk. 2626839.00 Part-C Construction of 2Nos U-Drain 1.00mx1.00m at Ch. 140m & 380m Under B 1.5050 106.039 M/S Noor & Sons 106.039 18/06/2018 18/05/2019 35 07/04/2019  
5 BDRIDP/BAR/SDR/Gha/01 Construction of Ghat & CC Road at Shaheber Bazar under Sadar Upazila Barisal . 32.787 M/S S H Enterprise 32.787 12/05/2018 12/11/2018 20 07/04/2019
6 BDRIDP/BAR/SDR/CCA-Rd(R)/11 Improvement of road from Charmonai Talukder Bari-West Razarchar Club by BC. at Ch. 0.00m-1203.00m under Charmonai Union, Upazila : Sadar, Dist-Barisal [Salvaged cost- Tk 231155.00] 1.2030 87.691 M/S Kohinoor Enterprise 87.691 25/01/2018 25/11/2018 40 07/04/2019  
7 BDRIDP/BAR/SDR/UZ-Rd/01 Improvement of Shehaber Hat Singherkati Chandramohon road from Ch. 729m - 1308m.under Sadar Upazila Barisal. 0.5790 42.095 M/S Niaz Traders 42.095 70 07/04/2019  
8 BDRIDP/BAR/SDR/UN-Rd/01 a .Improvement of road from Gilatali Kheyaghat - Biswasher hat via Model Madrasha. from Ch.1500 - 4260m under Sadar UpazilaDistrict-Barisal. b. Construction of 3 Nos 1.6m x 1.6m RCC Box culvert at ch.2568m 3530m & 4033m and 1No.4m x4m RCC Box Culvert at ch.3640m on the same road. 2.7600 18760504.000 Md Mafuz Khan 18760504.000 18/01/2018 30/11/2019 20 07/04/2019
9 BDRIDP/BAR/SDR/CCA-Rd/10 Improvement of Road from Shaheber Hat to Bairagibari Via Gourchandra Bridge (Bisharad GPS cum CS) from Ch.5103 - 6647m including 1 No.1.0m x1.0m U-Drain & 1No.3.m x 3.0m RCC Box Culvert at Ch.5479m & 6141m under Sadar Upazila,Barisal. 1.5400 9500469.000 M/S Sirajul Alam Sikder 9500469.000 29/05/2017 08/04/2019 65 07/04/2019
10 BDRIDP/BAR/SDR/CCA-Rd(R)/05 Rehabilitation of road from Jaliabari Pool via Mujaffar Hazi Bari road by BC from Ch. 0.00m-2782m. 2.7820 109.104 M/S Hasan Construction 109.104 17/05/2015 17/02/2016 100 07/04/2019  
11 BDRIDP/BAR/SDW/UZ-Ew/01 Resectioning of Shehaber Hat-Singherkati Chandramohon Road at Ch. 729m-1009m 0.2800 2.551 LCS No-1 2.551 100 16/01/2019 Final
12 BDRIDP/BAR/SDR/UN-EW/01 Resectioning of Road from Gilatali Kheyaghat-Biswasherhat via Model Madrasha at Ch. 1500m-2700m 1.2000 4.381 LCS No-1 4.381 100 16/01/2019 Final
13 BDRIDP/BAR/SDR/CCA-EW/03 Resectioning of road Shibpasha-Sholna Talukder Bari via Malek Police Bari at Ch. 0.00m-1600m (Sholna DC Road-Tulatola-Badantola with link road Tulatola-Ghorami Bari Bridge). 1.6000 4.000 Fatema Begum LCS No-1 4.000 29/02/2016 30/04/2016 100 16/01/2019  
14 BDRIDP/BAR/SDR/CCA-EW/02 Resectioning of road from Charkawa Nayami-Shaheber hat via Durgapur hat (Barisal Sadar Upzila 7no. Charkawa union 1no word nurul islam to Bank Jalal Bari Pull) road from Ch. 0.00m-1000m. 1.554 Md. Anowar Hossain Mridha LCS No-1 1.554 16/04/2015 16/05/2015 100 16/01/2019  
15 BDRIDP/BAR/SDR/CCA-EW/01 Rehabiliation of road from of Narokati Altaf Mollah Bari-Moslem Howlader Dokan via GPS (Narokati GPS) road by BC from Ch. 0.00m-732m. 0.7320 2.382 Md. Giush Uddin LCS No-1 2.382 15/02/2015 30/04/2015 100 16/01/2019 Final
16 BDRIDP/BAR/SDR/CCA-RdR/12 Improvement of road Shibpasha - Sholna Talukder bari via H/O Malek Police at ch.1600km - 2020km under Sadar Upazila Barisal. 0.4200 27.200 M/S Kohinoor Enterprise 27.200 100 16/01/2019  
17 BDRIDP/BAR/SDR/UN-Rd/02 Improvement of Charkawa Kheyaghat - Durgapur hat road from Ch. 3000m - 3600m.under Sadar Upazila Barisal District. 0.6000 34.646 M/S Niaz Traders 34.646 60 16/01/2019  
18 BDRIDP/BAR/SDR/CCA-Rd/09 (a) Improvement of road Shibpasha-Sholna Talukder Bari via Malek Police Bari at Ch. 0.00m-1600m (Sholna DC Road-Tulatola-Badantola with link road Tulatola-Ghorami Bari Bridge) (b) Construction of 1.60m×1.60m Box Culvert and U-Type Culvert at Ch. 694m & 13 1.6000 125.904 M/S Khondokear Enterprise 125.904 30/06/2016 26/06/2017 100 16/01/2019  
19 BDRIDP/BAR/SDR/CCA-Rd/07 Improvement of road from Charkawa Nayani - Shaberhat via Durgapur hat (Barisal Sadar Upazila 7no. Charkawa union 1no.word nurul islam to Bank Jalal Bari Pull) road By HBB from Ch.0.0 - 1000m under Barisal-S Upazila,Barisal District. e-ID : 29367 1.0000 24.308 M/S Apu Enterprise 24.308 100 16/01/2019 Final
20 BDRIDP/BAR/SDR/CCA-Rd(R)/06 Rehabilitation of road from Kasem Defader Bari - Karnokati High School & College road By BC from ch.310 - 1125m under Sadar upazila ,Barisal District [Salvaged Cost-Tk 4,97,038.00] 0.8150 33.858 M/S Oshin Enterprise 33.858 18/05/2015 18/02/2016 100 16/01/2019 Final
21 BDRIDP/BAR/SDR/CCA-St/02 Construction of 1.0 x 1.0m and 1.6 x1.6m RCC Box culvert on Kasem Defader Bari - Karnokati High School & College road at ch.773m & 526m e-ID: 17457 5.162 M/S Khondokar Borthers 5.162 23/06/2015 22/12/2015 100 16/01/2019 Final
22 BDRIDP/BAR/SDR/CCA-St/04 Construction of 4 Nos 2.00×1.60m Box Culvert on Jaliabari Pool via Mujaffar Hazi Bari road at Ch. 391m, 910m, 1740, & 1860m. 13.339 M/S Khondokar Borthers 13.339 28/07/2015 27/01/2016 100 16/01/2019 Final
23 BDRIDP/BAR/SDR/CCA-Rd/04 Improvement of road from Chownatha Toabu Chowkider Bari via Clinic road by BC from Ch. 0.00m-1000m with 1 No 1.60m×1.60m Box Culvert at Ch. 366m. 1.0000 45.435 M/S Lutful Kabir 45.435 100 16/01/2019 Final
24 BDRIDP/BAR/SDR/UN-St/01 Construction of 20.00m Long RCC Girder Bridge on Nishatala Tunglbaria UP office-Shaheberhat via Bisharad road at Ch. 136m. 0.0200 127.728 M/S Rupali Construction 127.728 17/03/2015 17/03/2016 100 16/01/2019  
25 BDRIDP/BAR/SDR/CCA-Rd/03 Improvement of Road form Karnakathi Puraton Hat-Char Aicha Sabuz Memerer Bari By BC Ch. 0.00-513m 0.5130 28.095 M/S Serajul Islam Hanif 28.095 100 16/01/2019 Final
26 BDRIDP/BAR/SDR/CCA-Rd/02 Improvement of Chandpura Mojidderhat-Saheberhat via Khontakhali School road from Ch. 1635-3192m. 1.5570 74.667 M/S G M Construction 74.667 17/08/2014 16/05/2015 100 16/01/2019 Final
27 BDRIDP/BAR/SDR/CCA-Rd/01 Improvement of Bukhainagar Bridge to Abdul Aziz Khan's House via Shaluka GPS Road (Ch. 00-500m). 0.5000 20.456 M/S Talukder Enterprise 20.456 16/06/2014 16/09/2014 100 16/01/2019 Final
6 Gouranadi
1 BDRIDP/BAR/GOR/UN-RdR/05 Periodic Maintenance of Chadshi UP Office-Goila UP Office Road.a Earthwark from Ch. 0- 830m.b Carpeting DC 322.5 sqm.c 12mm SC-2208.35 sqm. Under Gournadi Upazila District - Barishal. 1001243.000 1001243.000 0 08/04/2019 E-Tender Under Process.
2 BDRIDP/BAR/GOR/UZ-RdR/07 Periodic Maintenance of Batazore GCNHW to Dhamura GC via Solak Bazar road.a Earthwark from Ch. 0- 2145m.b Carpeting 40mm-DC 6403.2 sqm.c Palisading Work297.00m. Under Gournadi Upazila District - Barishal. 8824294.000 8824294.000 0 08/04/2019 E-Tender Under Process.
3 BDRIDP/BAR/GOR/UZ-RdR/06 Periodic Maintenance of iIlah Bas stand NHW to Agailjhara H/Q via Bakai & Rajihar Bazar in/c Nutun Bazar Connecting road.a Earthwark from Ch. 0- 3832m.b Carpeting DC 3224.409 sqm.c 12mm SC-11191.1 sqm. Under Gournadi Upazila District - Barishal. 5915176.000 5915176.000 0 08/04/2019 E-Tender Under Process.
4 BDRIDP/BAR/GOR/UZ-RdR/05 Periodic Maintenance of Batazore-Agarpur-Sarikal via Hosnabad Nalchira-Miarchar road. a Earthwark from Ch. 8725- 17177m.b Carpeting DC 17361.14 sqm.c 12mm SC-13906.56 sqm. Under Gournadi Upazila District - Barishal. 16020946.000 16020946.000 0 08/04/2019 E-Tender Under Process.
5 BDRIDP/BAR/GOR/UZ-ST/02 Construction of 32.00m PSC Girder Bridge on Barti BazarNHW to Gournadi GC via Torky GC at Ch.9340km over Kashba Khal under Gournadi Upazila District-Barisal 241.968 M/S Kohinoor Enterprise 241.968 18/03/2018 18/03/2019 65 08/04/2019  
6 BDRIDP/BAR/GOR/UZ-ST/01 Construction of 30.00m PSC Girder Bridge on Barti Bazar to Gournadi GC at Ch.5000km over Anandhapur Khal under Gournadi UpazilaDistrict-Barisal 249.342 M/S Kohinoor Enterprise 249.342 18/03/2018 18/03/2019 75 08/04/2019  
7     2.099 Md Mohasin Sharder LCS-2 2.099 100 16/01/2019  
8 BDRIDP/BAR/GOR/UZ-EW/01 Resectioning of road from Brthi Bazar (NHW) to Burghata Bus Stand (NHW) via Amanothgonj hat at Ch. 450m-2450m by earth. 2.0000 3.000 Md Mahabub Khan LCS-1 3.000 100 16/01/2019  
9 BDRIDP/BAR/GOR/UN-EW/01 Improvement of road from Mahilara UP Office to Chadshi hat via Billogram Bazar road By Earth Filling Work from Ch. 3740m-4850m. 1.1100 3.495 Anjur Ali Sarder LCS No-1 3.495 15/11/2015 30/03/2016 100 16/01/2019  
10 BDRIDP/BAR/GOR/UZ-Rd/04 Improvement of Barthi Bazar (NHW) to Burghata bus Stand (NHW) via Amanagong hat at Ch. 450-2450m. e-ID : 19611 2.0000 128.745 M/S Howlader Constructure 128.745 100 16/01/2019 Final
11 BDRIDP/BAR/GOR/CCA-Rd/03 Improvement of road from Battala Kapali bari Bridge (NHW) to Khanjapur High School road by BC from Ch.00 - 1656m Under Gournadi Upazila, District-Barisal e-ID : 22285 1.6560 70.608 M/S Siam Enterprise 70.608 100 16/01/2019 Final
12 BDRIDP/BAR/GOR/CCA-St/01 Construction of 3 Nos Single Vent 4.30mx4.30m RCC Box Culvert & 2 nos U-Drain on Battala Kapali bari Bridge (NHW) to Khanjapur High School road at ch. 95m,270m,1276m564m&970m Under Gournadi Upazila, District-Barisal e-ID : 22284 66.805 M/S Siam Enterprise 66.805 100 16/01/2019 Final
13 BDRIDP/BAR/GOR/UN-St/01 Construction of 2-Vent 4.30mx4.30m RCC Box Culvert on Mahilara UP office to Chadshi hat via Billogram Bazar road at Ch. 4200m. 19.709 M/S Santu Traders 19.709 15/07/2015 14/12/2015 100 16/01/2019 Final
14 BDRIDP/BAR/GOR/UN-Rd(R)/04 Rehabilitation of road from Mahilara UP office to Chadshi hat via Billogram Bazar road from Ch. 3740-4850m (Salvage Material Cost Tk. 11,01,418.00) 1.1100 53.594 M/S Santu Traders 53.594 15/07/2015 14/04/2016 100 16/01/2019  
15 BDRIDP/BAR/GOR/UN-Rd/03 Rehabilitation of road from Mahilara UP Office to Chadshi Hat via Bilogram Bazar (A. Rob Chokder House to Chadshi Hat road) road By BC from Ch. 5370-6900m. 1.5300 58.344 M/S Santu Traders 58.344 15/07/2015 14/04/2016 100 16/01/2019 Final
16 BDRIDP/BAR/GOR/UZ-Rd/03 Improvement of Barthi Bazar (NHW) to Gournadi GC via Torky GC at ch.2150 - 4150m. 2.0000 131.456 M/S Santu Traders 131.456 15/07/2015 14/07/2016 100 16/01/2019 Final
17 BDRIDP/BAR/GOR/CCA-Rd/01 Improvement of road from Maddam Hosnabad Nabarun RPS to Nezamuddin College by HBB at Ch.481-1492m (Nizamuddin Degree College road from freedom fighter Nizamuddin Shaheber Kaborstan via Madha hosnabad UP Member Md.Matiur Rahman Sarif Bari Bridge under Gour 1.0110 28.392 Md. Sirazul Islam Hanif 28.392 27/11/2014 27/04/2015 100 16/01/2019 Final
18 BDRIDP/BAR /GOU/UN-Rd/02 (a) Improvement of Batazore GC to Pinglakathi Bazar via Pachim Chandrahar GPS at ch. 0m-1000m), (b)Construction of 1 nos U-drain at at ch.14m on the same road, (c) Construction 1v-2.3mx2.30m RCC Box Culvert at ch.527m & 1583m on the same road Under Gourna 1.0000 78.051 M/S Islam Brothers 78.051 23/11/2014 23/05/2015 100 16/01/2019 Final
19 BDRIDP/BAR /GOU/UZ-Rd/02 Improvement of illah (NHW) to Kalkini Upazila HQ via Tulatala Bazar at ch.2413m-3213m), Under Gournadi Upazila, District-Barisal. 0.8000 46.433 M/S Sadman Builders 46.433 16/11/2014 15/05/2015 100 16/01/2019 Final
20 BDRIDP/BAR /GOU/UZ-Rd/01 (a) Improvement of Road from Gournadi Bandar GC to Muladi GC via Kutubpur Bazar at ch. 0m-630m), (b) Construction of 2 nos U-drain at ch. 205m & 364m on the same road Under Gournadi Upazila, District-Barisal. 0.6300 51.226 M/S Islam Brothers 51.226 23/11/2014 23/05/2015 100 16/01/2019 Final
21 BDRIDP/BAR /GOU/UN-Rd/01 (a) Improvement of Road from Sarikal GC to Shaheber char Bazar via Nalchira Bazar ch. 5555m-7055m), (b) Construction of 2 nos U-drain at ch.599m & 6555m on the same road Under Gournadi Upazila, District-Barisal. 1.5000 97.854 M/S Islam Brothers 97.854 23/11/2014 23/05/2015 100 16/01/2019 Final
22 BDRIDP/BAR/GOR/CCA-Rd/02 Improvement of road from Gournadi Highway Thana Connecting road under Gournadi Upazila. 15.442 M/S Tamim Enterprise 15.442 21/06/2015 20/11/2015 100 16/01/2019 Final
7 Hizla
1 BDRIDP/ BAR/HZL/ CCA-Rd/07 Improvement of Purbo Kandi WDB Embt. Salvaged Cost Tk 257546.00i Earthwark Ch.0.00m-900m. ii Carpeting DC Ch.0.00m-900m. iii Palsading 95m.Under Hizla Upazila Barishal District. 6755327.000 6755327.000 0 08/04/2019 E-Tender Under Process.
2 BDRIDP/BAR/HZL/UZ-St/01 Dhunusikder Hat to Memania Taker Hat road via Abupur Kheyaghat i Construction of Diuble vent 2 x 4.50 x 6.50m RCC Box Culvert at Ch.2600mii Construction of Diuble vent 2 x 4.00 x 5.00m RCC Box Culvert at Ch.3380mUnder Hizla Upazila Barishal District. 5693472.000 5693472.000 0 08/04/2019 E-Tender Under Process.
3 BDRIDP/BAR/HZL/CCA-Rd/06 Improvement of Kawria Bazar Danushikder hat road - Noroshingpur road Start Mollah Bari Shop Salvaged Cost Tk.309333.54 i Earth work Ch.0.0 - 760miiCarpeting DC Ch.0.0 - 760m under Hizla Upazila District Barishal. 1255934.000 1255934.000 0 08/04/2019 E-Tender Under Process.
4 BDRIDP/ BAR/HZL/ CCA-Rd/05 Improvement of road from UZR -6 Mohishkhola Madrasha to VRA-15 Uttor Guabaria GPS via house of Abdul Gafur Sarder road by BC From Ch. 00m-1760.00m. Salvage Amount TK 296023.00 Under Hizla Upazila District- Barishal. 12738507.000 12738507.000 0 08/04/2019 E-Tender Under Process.
5 BDRIDP/BAR/HZL/UZ-EW/01 Resectioning of road from Dhanusikder Hat to Muladi Upazila Road at Ch. 0.00m-325m 0.3250 2.265 Md. Humaun KabirLCS No-1 2.265 15/11/2015 30/03/2016 100 08/04/2019  
6 BDRIDP/BAR/HZL/CCA-Rd/04 Improvement of road from Horinathpur Koshaipotti UZR - Zetighat GPS UZR ID No. a Earthwork from Ch.0.0 -1500m b Carpetting BC from Ch.0.0 -1500m under Hizla Upazila District Barishal Salvaged Cost TK 112128.00 1.5000 99.367   99.367 10 08/04/2019  
7 BDRIDP/BAR/HZL/CCA-Rd/03 Improvement of Khunna Hospital RHD via Kawmi Madrasha - Baherchar UZR Barajalia Board GPS CS Connecting road a Earthwork from Ch.850 -1820m b Carpetting BC from Ch.850 -1820m under Hizla Upazila District Barishal Salvaged Cost TK 2343371.00 0.9700 67.976   67.976 20 08/04/2019  
8 BDRIDP/BAR/HZL/Gha/01 Construction of RCC Boat land Station at Abupur Ghat under Hizla Upazila Barisal 32.546 M/S S H Enterprise 32.546 100 08/04/2019  
9 BDRIDP/BAR/HZL/CCA-Rd/02 Improvement of Hizla Muladi road to Motiar Dewan Bari via Sergent Dula Bari roadRHD via Surgeant Dulal- Kathal BeganUZR under Hizla Upazila Barisal District.ID No.506364003 Salvaged Cost Tk.2186650.00a Earth work Ch.0.0 - 1500mb Carpetting Ch. 0.0 - 1500m 1.5000 100.534 M/S R S Construction 100.534 28/06/2018 28/12/2018 25 08/04/2019  
10 BDRIDP/BAR/HZL/CCA-Rd/01 Improvement of Kowria- Moulavirhat UZR Poschim koralia road under Hizla Upazila District Barisal aEarth work from Ch.0.0 -900m b Dense Carpeting Ch.0.0 -900m c Two vent 4m x 4m RCC Box Culvert at Ch.252m 0.9000 0.000 Md. Mahafuz Khan 0.000 35 08/04/2019  
11 BDRIDP/BAR/HZL/UZ-Rd(R)/01 Rehabilitation of road from of Dhanusikder Hat-Muladi Upazila road by BC from Ch. 0.00m-1000m. 1.0000 70.946 M/S Oshin Enterprise 70.946 28/05/2015 28/02/2016 100 16/01/2019 Final
8 Mehendiganj
1 BDRIDP/BAR/MHN/UZ-EW/01 Resectioning of Ulania GC-Aligonj GC (Hizla) Road at Ch. 1000m-1600m 0.6000 1.649 LCS No-1 1.649 100 08/04/2019  
2 BDRIDP/BAR/MHN/CCA-EW/01 Resectioning of Purbo Yearbeg (Paloun Bari)-Trimohoni Big Road via Howlader Bari, Jamadder Bari Ebtadi Madrasha at Ch. 0.00m-600m by Earth. 0.6000 3.464 Nizam Uddin TalukderLCS No-1 3.464 18/12/2016 18/03/2017 100 08/04/2019  
3 BDRIDP/BAR/MHN/GC/01 Constructionof Langutia G C (i) Fish Shed (Size : 12m x 6m) (ii) 2 Nos Waste collection Pit (Dustbin) (Size : 1.4m x 1.4m) (iii) Multipurpose Shed (Size : 12m x 6m) (iv) Logistic Support for Langutia Bazar (v) Toilet Block (Size : 5.75m x 3.07m) (vi) 2 No 49.897   49.897 0 08/04/2019 Evaluation on going
4 BDRIDP/BAR/MHN/CCA-Rd/03 Improvement of Road from Posshim Yearbeg Dadpur GPS under Mehendiganj Upazila District Barisal ID 506625062aEarthwork Ch.1000 2760m b HBB Ch.1000 -2760m 1.7600 59.603 M/S Amir Engineering Corporation 59.603 100 08/04/2019  
5 BDRIDP/BAR/MHN/UZ-Rd/02 Improvement of Ulania GC Aligonj(Hizla) road from Ch.1000-4000m under Mehandigonj Upazila,Barisal. 3.0000 105.453 M/S Lutful Kabir 105.453 14/05/2017 14/02/2018 100 08/04/2019  
6 BDRIDP/BAR/MHN/CCA-Rd/02 Improvement of road Purbo Yearbeg (Paloun Bari) - Trimohoni Big Road via Howlader Bari,Jamadder Bari Ebtadi Madrasha from ch.0.00 - 1610m with U-Drain (0.625m x 0.90m) at ch.1051m. 1.6100 68.643 M/S Hasan Construction 68.643 19/01/2017 19/09/2017 70 08/04/2019  
7 BDRIDP/BAR/MHN/CCA-St/01 Construction of 1.0 x 1.0m RCC Box culvert at Ch.3042 on Mothertoli Bazar - Uttarchar road via Charekkaria UP road Under Mehendigonj Upazila, District-Barisal. 2.227 M/S Hasib Enterprise 2.227 16/11/2014 15/03/2015 100 16/01/2019 Final
8 BDRIDP/BAR/MHN/CCA-Rd/01 Improvement of Mothertoli Bazar - Uttarchar road via Charekkaria road by BC (Ch.2170-3220m, Road Under Mehendigonj Upazila, District-Barisal. 1.0500 53.274 M/S Nahid Enterprise 53.274 23/11/2014 23/04/2015 100 16/01/2019 Final
9 BDRIDP/BAR/MHN/UZR(R)-Rd/01 Rehabilitation of Patherhat GC - Kazirhat GC Road by BC at Ch.1500 - 2610m Under Mehendigonj Upazila, District-Barisal. 1.1100 58.537 M/S Santu Traders 58.537 27/11/2014 27/04/2015 100 16/01/2019 Final
9 Muladi
1 BDRIDP/BAR/MUL/CCA-Rd/01 Rehabilitation of road Raguya Kazirchar R & H - Joynal Master via H/O Sahajahan Dafader (Ch.0.00- 1000.00m. Road under Muladi upazila, Barisal District. 1.0000 41.728 M/S Santu Traders 41.728 27/11/2014 27/04/2015 100 07/04/2019 Final
2 BDRIDP/BAR/MUL/UZ-Rd/01 Improvement of road from Mirdarhat GC-Nazirpur GCCR via Madrasharhat Nomorhat & Bangla Bazar road Ch. 0.00-3450m. 3.4500 244.063 M/S Lutful Kobir 244.063 20/08/2014 20/05/2015 100 07/04/2019 Final
3 BDRIDP/BAR/MUL/CCA-EW/04 Resectioning of road from Char Kalekhan Goni Bari-khalil Bepari bari road by Earth work from Ch. 0.00m-1550m. 1.5500 1.012 Md. Mojibor RohmanLCS No-1 1.012 30/08/2015 30/12/2015 100 07/04/2019 Final
4 BDRIDP/BAR/MUL/CCA-EW/02 Earth work of road from Boraiya R&D to Prokas Mondol bari via Boraiya GPS at Ch. 0.00-585m under Muladi upazila, Barisal District. 0.5850 2.398 Md Kabir HossainLCS No-1 2.398 18/11/2014 18/02/2015 100 07/04/2019 Final
5 BDRIDP/BAR/UZP/UN-EW/01 Resectioning of Mirdar Hat GC (Bashtala Bazar)-Poddar hat-Dumuritala-Dhanu Shikder Hat GC (Horinatpur) at Ch. 2150m-2750m. 0.6000 2.496 LCS No-1 2.496 80 07/04/2019 Final
6 BDRIDP/BAR/MUL/CCA-EW/01 Earth work of road Raguya Kazirchar R&H-Joynal Master via H/Q Sahajahan Dafader Ch. 0.00m-1000m under Muladi upazila, Barisal District. 1.0000 2.219 Md Fazlu TafaderLCS No-1 2.219 18/11/2014 18/02/2015 100 07/04/2019 Final
7 BDRIDP/BAR/MUL/CCA-EW/03 Improvement of road from Bepari Bridge to Char Padma hat via Habib noli at Safipur UP (South Side of Amir Sarif Bridge to Madrasha Bazar via Front of Mojibur Rahaman Noli Bari) road by Earth work from Ch. 00-1250m under Muladi upazila, Barisal District. 1.2500 3.233 Fokrul AhosanLCS No-1 3.233 31/05/2015 30/09/2015 50 07/04/2019  
8 LCS Improvement of road by earth work from Mirdarhat GC-Nazirpur GCCR via Madrasharhat, Nomorhat & Bangla Bazar Ch.0-3450m. 3.4500 4.281 LCS No 01 to LCS No-10 4.281 22/05/2014 22/10/2014 100 07/04/2019  
9 BDRIDP/BAR/MUL/CCA-Rd/12 Improvement of road from Haraz Sikder Bari to Laxmipur Nutun hat via Rashid Dhali Bari by BC at Ch. 0.900km-2.400km under muladi upazila Barisal District.Salvaged cost Tk.888105.00 1.5000 91.473 M/S R.S Construction 91.473 15 07/04/2019  
10 BDRIDP/BAR/MUL/CCA-Rd/11 Improvement of road from Muladi-Bara Patarchar Ferry Ghat M by BC at Ch. 3.500km-4.065km. ID No.506694017 under muladi upazila Barisal District 0.5650 33.385 M/S AK Buidlers 33.385 14/06/2018 14/11/2018 10 07/04/2019  
11 BDRIDP/BAR/MUL/CCA-Rd/10 Improvement of road from Balarmpur Bazar-Dumurtala GPS-Char Dumuritala Bissas Bari Mosque UNRG by BC at Ch. 0.000km-1.000km. under muladi upazila Barisal District 1.0000 57.020 M/S Ferdousi Construction 57.020 10 07/04/2019  
12 BDRIDP/BAR/MUL/CCA-Rd/08 Improvement of road from Batamara Paderhat Launch Ghat -Salimpur Bazar via Batamara Regd.Primary School via Aminul Haque Kabir Bari by BC at ch.200m - 1252m under Muladi Upazila Barisal. 1.0520 60.000 Md. Mahafuz Khan 60.000 15 07/04/2019  
13 BDRIDP/BAR/MUL/CCA-Rd/09 Improvement of road from Talukder HatKhejurtala Ali Sikder bari by BC Start Pokhi Rostom fokir bari to Nomor hat via Sumsun Nahar Chowdhury Bari at Ch.0.0m -1000m under Muladi Upazila Barisal District.Salvaged Cost Tk 591644.00Improvement of road from Tal 1.0000 58.851 Orien Trading & Builders 58.851 60 07/04/2019  
14 BDRIDP/BAR/MUL/UZ-Rd/02 a Improvement of Mirdar Hat GC Bashtala Bazar - Poddar hat- dumuritala -Dhanu Shikder Hat GC Horinathpur Road from Ch.2150m - 4415m under Muladi Upazila Barisal District.b Construction of 1 Nos. 1vent 2.0m x 2.0m RCC box culvert on Mirdar Hat GC Bashtala 2.2650 171.700 Orien Trading & Builders 171.700 40 07/04/2019  
15 BDRIDP/BAR/MUL/CCA-Rd/07 Improvement of road from Muladi-Mirdar Hat GCCR Kazi Ali Ahmed Bari Grostan Alauddin Dewan Bari under Muladi UpazilaBarisal.a Bituminus Surfacing wearing courseDC 0.0m - 375mb 1 No.1.3m x 1.3m RCC Box Culvert at ch.170m 0.3750 25.911 M/S Kohinoor Enterprise 25.911 25/01/2018 25/07/2018 25 07/04/2019  
16 BDRIDP/BAR/MUL/UZ-St/05 Construction of 30.00m PC Girder Bridge on Mirdhar Hat GC-Nazirpur GC at Ch.7620km over Banimardhan Khal under Muladi UpazilaDistrict-Barisal 210.221 M/S Amir Engineering Corporation and M.M Builders & Engineers 210.221 95 07/04/2019  
17 BDRIDP/BAR/MUL/UZ-St/04 Construction of 25.00m long PC Girder Bridge on Mirdhar Hat GC-Nazirpur GC at ch.8380km over Banimardhan khal under Muladi Upazila Barisal. 235.036 Orien Trading & Builders 235.036 90 07/04/2019  
18 BDRIDP/BAR/MUL/UZ-St/02 Construction of 45.00m long RCC Girder Bridge on Mirdhar hat GC-Harinathpur GC - Muladi Border at Ch.3+596km. Over Char Dumuritala khal under Muladi Upazila,Barisal District. 244.348 M/S Islam Brothers 244.348 80 07/04/2019  
19 BDRIDP/BAR/MUL/UN-St/01 Construction of 21.00m long RCC Girder Bridge on Boropatherchar GPS at Ch.0900km over Uttar Char Dakatia Khal under Muladi Upazila Barisal District. 157.955 M/S Islam Brothers 157.955 95 07/04/2019  
20 BDRIDP/BAR/MUL/UZ-St/03 Construction of 20.00m long RCC Girder Bridge on Mirdhar hat GC-Nazirpur GC at Ch. 4+500km Over Charkalekhan khal under Muladi Upazila, Barisal District. 179.240 PTSL-MOTREE (PVT) LTD 179.240 16/08/2017 15/08/2018 100 07/04/2019  
21 BDRIDP/BAR/MUL/UN-St/02 Construction of 20.00m long RCC Girder Bridge on Boropatherchar GPS at Ch. 0+650km Over Uttar Dakathia khal under Muladi Upazila, Barisal District. 143.126 PTSL-MOTREE (PVT) LTD 143.126 16/08/2017 15/08/2018 100 07/04/2019  
22 BDRIDP/BAR/MUL/UZ-St/01 Construction of 4 Nos Box Culvert on Mirdarhat GC-Nazirpur GCCR via Madrasharhat Nomorhat & Bangla Bazar road at Ch. 1020m, 1950m, 2360m & 3435m. 77.981 M/S Misi Construction 77.981 28/07/2014 27/03/2015 100 07/04/2019 Final
23 BDRIDP/BAR/MUL/CCA-St/05 Construction of 12.00m RCC Slab Bridge on Char Pakkia GPS at Ch.0+000km over Char Pakkia Khal. 100.681 M/S Shafi Enterprise 100.681 13/02/2017 13/12/2017 100 16/01/2019 Final
24 BDRIDP/BAR/MUL/CCA-St/04 Construction of 1 vent 4.00m×4.00m and 1 vent 1.00m×1.00m RCC Box Culvert on Char Kalekhan Goni Bari-Khalil Bepari Bari road at Ch.182m & 330m. 19.374 Md. Khair Hossain 19.374 15/10/2015 15/04/2016 100 16/01/2019 Final
25 BDRIDP/BAR/MUL/CCA-Rd/06 Improvement of road from Char Kalekhan Goni Bari-Khalil Bepari Bari road by BC from Ch. 0.00m-1550m. 1.5500 89.331 Md. Khair Hossain 89.331 15/10/2015 15/04/2016 100 16/01/2019 Final
26 BDRIDP/BAR/MUL/CCA-St/01 Construction of 1 no 1 Vent 2.00m×2.00m RCC Box Culvert on Bepari Bridge to Char Padma hat via Habib noli at Safipur UP (South Side of Amir Sarif Bridge to Madrasha Bazar via Front of Mojibur Rahaman Noli Bari) road at Ch. 750m 5.055 M/S Sraboni Enterprise 5.055 28/06/2015 27/12/2015 100 16/01/2019 Final
27 BDRIDP/BAR/MUL/CCA-Rd/03 Improvement of road from Bepari Bridge to Char Padma hat via Habib noli at Safipur UP (South Side of Amir Sarif Bridge to Madrasha Bazar via Front of Mojibur Rahaman Noli Bari) road from Ch. 0.00m-1250m. 1.2500 33.103 Md Sirazul Islam Hanif 33.103 25/05/2015 25/05/2016 100 16/01/2019 Final
28 BDRIDP/BAR/MUL/CCA-Rd/05 Improvement of road from Kashem Sharder Barir Pool-Kaetmara Kader Mirda Bari road by BC road Ch. 750m-2100m. 1.3500 54.501 M/S Topu Enterprise 54.501 18/05/2015 18/10/2016 100 16/01/2019 Final
29 BDRIDP/BAR/MUL/CCA-Rd(R)/04 Rehabilitation of road from Madrashar Hat (Start from Char Kalekhan College gate) to Charmalia Beparir Hat road by BC from Ch. 0.00m-2175m. 2.1750 89.692 M/S Topu Enterprise 89.692 18/05/2015 18/10/2016 100 16/01/2019 Final
30 BDRIDP/BAR/MUL/CCA-St/03 Construction of 2 Nos 4.00m×4.00m (2 Vent) RCC Box Culvert on Kashem Sharder Barir Pool-Kaetmara Kader Mirda Bari road at Ch. 750m & 1402m 51.155 M/S Lutful Kobir 51.155 25/10/2015 100 16/01/2019 Final
31 BDRIDP/BAR/MUL/CCA-St/02 Construction of 1 No 4.00m×4.00m (3 Vent) RCC Box Culvert on Madrashar Hat (Start from Char Kalekhan College gate) to Charmalia Beparir Hat Road at ch. 0.00m. 25.438 M/S Lutful Kobir 25.438 25/10/2015 100 16/01/2019 Final
32 BDRIDP/BAR/MUL/CCA-Rd/02 Improvement of Road from Boraiya R & HD to Prokas Mondol bari via Boraiya GPS at Ch.0+00km to 0+585km ,Road under Muladi upazila, Barisal District. 0.5850 27.631 M/S Santu Traders 27.631 27/11/2014 27/04/2015 100 16/01/2019 Final
10 Uzirpur
1 BDRIDP/BAR/UZP/CCA-Rd/05 Part A Improvement of road from Muktijodda Milon Kendra Connecting road Harasia road.i Carpeting DC Ch. 0.00m-900m. ii 3 Nos.0.625mx0.600m U-Drain at Ch.10m365m665m.Part B Improvement of road from East Joysree Village road.i Carpeting DC Ch. 0.00m-1000m.ii 2 Nos.0.625mx0.600m U-Drain at Ch.605m865m. Salvaged Cost Tk 141267.00Part C Improvement of road from Jugihati-Chokder bari Jame Mosque to Damodarkathi Tri mukhi Atok road by DC at Ch.0.00m-1050.00m with 1 No.4.30mx4.30m RCC Box Culvert at Ch.560m. 3 Nos.0.625mx0.600m U-Drain at Ch.130m760m & 835m. Under Uzirpur Upazila Barishal District. 2.5000 23428700.000 23428700.000 0 07/04/2019 Tender Processing
2 BDRIDP/BAR/UZP/UZ-EW/04 Resectioning of Harta Chowmuhani (Bisherkandi) {Harta GC-Bisherkandi GC} Road at Ch. 0.00m-1000m 1.0000 5.128 Shilpi BiswasLCS No-1 5.128 30/10/2017 30/03/2018 80 07/04/2019  
3 BDRIDP/BAR/UZP/UN-EW/01 Resectioning of Uzirpur H/Q Bamril UP Office-Gondesor Bazar (Uzirpur UZHQ Girls School-Kholna More-Bamril R&H) From Ch. 3400m-3900m By Earth. 0.5000 4.345 Md. Ziaul HaqueLCS No-1 4.345 31/05/2017 31/10/2017 100 07/04/2019 Final
4 BDRIDP/BAR/UZP/UZ-EW/01 Resectioning of road from Dhamura-Sholok Batajore (Upto Gouranadi Upazila Border) Road from Ch. 0.00m-700m. 0.7000 2.589 Yasin SarderLCS No-1 2.589 15/02/2016 30/04/2016 100 07/04/2019 Final
5 BDRIDP/BAR/UZP/UZ-EW/03 Resectioning of Road from Kalirbazar GC-Barisal Dhaka NHW-Sikerpur R&H Road Ch. 1754m-2850m. 1.0960 4.217 Kamrun NesaLCS No-1 4.217 18/12/2016 18/03/2017 75 07/04/2019  
6 BDRIDP/BAR/UZP/UZ-EW/02 Resectioning of Road from Satla-Chowmuhani (Bisherkandi upto Banaripara Upazila) {Satla GC (Satla H. School)-Razapur Chowmohoni-Bisherkandi GC Road} at Ch. 0.00m-1100m. 1.1000 4.185 Md. Shahidul IslamLCS No-1 4.185 30/04/2017 80 07/04/2019  
7 BDRIDP/BAR/UZP/CCA-Rd/03 Improvement of road from Guthia kakradhari Connecting road North side of Khaleque Mollas House of Dahorpara GPS via Mojid Masters House under Uzirpur Upazila Barisal a Earthwork Ch.0.0m -1550m b Bituminous Carpetting Ch.0.0m - 1550m c U-Drain 04 nos at Ch 1.5500 120.428 Md. Mahafuz Khan 120.428 65 07/04/2019  
8 BDRIDP/BAR/UZP/Gha/01 Construction of Typical Ghat at Satla Bazar under Uzirpur Upazila Barisal . 25.654 M/S S H Enterprise 25.654 40 07/04/2019  
9 BDRIDP/BAR/UZP/CCA-Rd/04 Improvement of Old Sikerpur Bandar-Abul Hasan Mridhas House Connecting road under Uzirpur Upazila Barisal a Earthwork Ch.0.0m - 360m b Bituminous Carpetting Ch.0.0m - 360m c U-Drain 01 no at Ch.117. 0.3600 27.387 M/S Kohinoor Enterprise 27.387 29/04/2018 29/08/2018 35 07/04/2019  
10 BDRIDP/BAR/UZP/UN-St/01 Construction of 12.00m Long RCC Girder Bridge over Chowdhuri Hat - Hasti Shundi via Daberkul road infront of A. Latif MasterDaberkul Chowmohani - Chowmohini Sere Bangla road at ch. 00.0m under Uzirpur Upazila Barisal District. 0.000 M.M Builders & Engineers 0.000 100 07/04/2019  
11 BDRIDP/BAR/UZP/UN-Rd/01 a Improvement of Uzirpur H/Q-Bamrail UP Office -Gondesor BazarUzirpur UZHQ Girls School-Kholna More-Bamrail R&H from Ch.3400m - 5740m under Banaripara UpazilaBarisal District. b Construction of 2Nos U-Drain on the same road at Ch.4695m & 5090m. 2.3400 150.606 M/S Niaz Traders 150.606 40 07/04/2019  
12 BDRIDP/BAR/UZP/UZ-RdR/04 Rehabilitation of Harta Chowmuhani Bisherkandi Harta GC - Bisharkandi GC Road at Ch.0.00m - 2600m including 04 Nos 0.625m x 0.600 Drainage CulvertU-Drain at ch.805m 933m 1148m & 1248m under Uzirpur Upazila Barisal District Salvaged Value 4053176.00 2.6000 178.273 M/S S H Enterprise 178.273 15/03/2018 15/03/2019 70 07/04/2019  
13 BDRIDP/BAR/UZP/UZ-Rd/03 Improvement of Road from Kalirbazar GC - Barisal Dhaka NHW - Sikerpur R & H Road at Ch.1754 - 4050m under Uzirpur Upazila, Barisal. 2.2960 147.539 M/S Hasan Construction 147.539 75 07/04/2019  
14 BDRIDP/BAR/UZP/UZ-Rd /02 Improvement of Road from Satla -Chowmuhani (Bisherkandi upto Banaripara Upazila) [Satla GC (Satla H. School) -Razapur Chowmohoni-Bisherkandi GC Road) At Ch.0.0m -2605m under uzirpur Upazila, Barisal. 2.6050 183.149 M/S Hasan Construction 183.149 60 07/04/2019  
15 BDRIDP/BAR/UZP/CCA-St/02 Construction of 1No.0.625m x 0.600m U-Drain & 1No.2 x 4.0m x 4.0m RCC Box Culvert on Goria Natunhat to Fakirbari via Gomostabari Corner, H/O Hazi Makbul Molla, Santu Market ,Nurani Madrasha & H/O Mr.Habibur Rahman road at Ch.650m & 816m. 25.862 Md Zakir Hossain Mia 25.862 30/11/2014 30/05/2015 100 07/04/2019 Final
16 BDRIDP/BAR/UZP/UZ-Rd(R)/01 Rehabilitation of road from Dhamura-Sholok Batajore (Upto Gouranadi Upazila Border) road from Ch. 0.00m-2100m. 2.1000 102.152 M/S G M Construction 102.152 100 16/01/2019 Final
17 BDRIDP/BAR/UZP/CCA-St/03 Construction of 2 Nos 1 Vent 2.00×2.00m RCC Box Culvert on the Khal on the road from Mosang Bazar South side of river towards the west (Mosang Khal GCCR to Mosang Jamey Mosque road) at Ch 10m & 400m. 33.971 Md Zakir Hossain Mia 33.971 18/05/2015 18/10/2015 100 16/01/2019 Final
18 BDRIDP/BAR/UZP/CCA-Rd/02 Improvement of road from Paschim Satla WAPDA to Satla Kheyaghat via H/O Fazlul Hoque Hawlader & Mosque By HBB from Ch. 0.00-375m. 0.3750 13.161 M/S Lutful Kabir 13.161 100 16/01/2019 Final
19 BDRIDP/BAR/UZP/CCA-Rd/01 Improvement of road from Goria Natunhat to Fakirbari via Gomostabari Corner, H/O Hazi Makbul Molla, Santu Market, Nurani Madrasha & H/O Mr.Habibur Rahman (Beer Protik) by BC from Ch.0.00-1500m under Uzirpur Upazila, Barisal. 1.5000 63.782 Md Sirazul Islam Hanif 63.782 100 16/01/2019 Final
20 BDRIDP/BAR/UZ/CCA-St/01 Construction of 15.00m RCC Girder Bridge at Ch. 1600m on Daberkul-Dhamura Road over the Thandar Khal infornt of Wazed Ali Sikder GPS. 65.441 M/S Safi Enterprise 65.441 18/06/2014 17/06/2015 100 16/01/2019 Final
Total : 208.4900 (Km) 266200192.92 (Lac) 266200192.92 (Lac)