Loading...

Project Scheme Detail List
SL No. Package No. Name Length (Km) Allotment (Lac) Name of Contractor Contract Amount (Lac) Date of Commencement Date of Completion Physical Progress (%) Date of Progress Update Remarks
1 Narayanganj-s
1 NCC2-09 a) Construction of RCC Drain Starting from Godnail Lal Building to Anayetnagar Lacky Bazzar Ch.0+000-2+505. (b) Construction of Drain (RCC/Brick/Pipe) Starting from Tatkhana more upto WAPDA Canal via Sayedpara wooden bridge, sayedpara kafil uddin Garments & the H/O mr. shamim at ward no.-08. Ch.0+000-0+670. (Total Length with 7 link drain=1616.0m) (c) Construction of RCC Drain(RCC/Brick/Pipe) Starting from Tatkhana Government Primary school to Chowdhuri bari road via Dr. Kuddus house at word no.-8. Ch.0+000-0+292 & Link Ch.0+000-0+100. (d) Construction of RCC Drain(RCC/Brick/Pipe) Starting from Starting from Dhanakunda Saudbari to rail line & Barepara Aklim Mia House at ward No.-08. Ch.0+000-0+170. (e) Construction of drain (RCC/Brick/Pipe) starting from Modhugar connecting upto WAPDA canal at ward no-08.Ch.0+000-0+356. Total Length (including 8 nos. Link Drain)=1840m. (f) Construction of Drain (RCC/Brick/Pipe) at Jhalkuri Starting from amtala mor to wapda canal via east side & Jhalkuri khola market at word no.-9. Ch.0+000-0+735, Ch.0+000-0+493(Link-1), Ch.0+000-0+288(Link-2). (g) Construction of Drain (RCC/Brick/Pipe) at Jhalkuri Starting from Jalkuri Naintarpar to Karoitala via Firoz Master House at ward no.-09. Ch.0+000-0+650, Ch.0+000-0+599(Link-1), Ch.0+000-0+100(Link-2), Ch.0+000-0+118(Link-3). (h) Construction of drain (RCC/Brick/Pipe) at Jalkuri starting from Jalkuri Wapda canal Culvert to end of NCC & Goramara Mosque-E-Noor via Rajmahal Chinema Hall at ward no-9. Ch.0+000-0+225, Total Length (including Link drain)=837m. (i) Construction of Drain (RCC/Brick/Pipe) at Jhalkuri Starting from Jalkuri Transmeter to Sheikderbari pool via Taher Ali House & Jalkuri Graveyard at ward no.-9. Ch.0+000-0+580. Ch.0+000-0+580(Link-1), Ch.0+000-0+190(Link-2) (j) Construction of Drain (RCC/Brick/Pipe) at Jhalkuri Starting from Modhugar Mojibor Poulty firm to Wapda canal near Ali Hossain House via Dewan Jame Mosque at ward no-9. Ch.0+000-0+400, Ch.0+000-0+370(Link-1), Ch.0+000-0+580(Link-2) 12.8720 2144.520 Mir Habibul Alam-Udayan Builders(JV) 2144.520 10/08/2017 13/12/2018 0 07/02/2019  
2 NCC2-07 Re-excavation of main canal from bhangar poll to Shimrail galakata bridge along with Protective Works by CC Block lining at west side of the main canal in Siddhirganj (Ch.0+000km to 5+538Km) at both sides. 5.2000 5834.501   5834.501 0 07/02/2019 Evaluation on process
3 NCC2-12 a) Re-construction of Road and Drain by RCC starting from AEPZ Road to Sumilpara Road in ward No-06 at Ch.000 to 0646. b) Re-construction of Char Sumilpara road by RCC with RCC drain in ward No06 Length350m & 6 nos link road length 1099m total effective length1449m. c) Re-construction of RCC road with RCC drain from Kaiums house to Noardapara moszid in ward no-24 Length86m & 1 Nos Link Road Length134m Total Effective length220m. d) Construction of Road by RCC with side drain in Shitolankha housing under Ward no.11including 4 Nos Link Road Effective length674m. e) Re-construction of drain & road by RCC from 100-0 road to Baitul Mamur Madrasha via Roman house beside Kadamrasul College in ward no-23Length400m & 1 Nos Link Road Length117m Total Effective length517m. f) Re-construction of RCC road with RCC drain from Bugbari Bus road to Bhandary bari in ward no-23 (Ch.000 to 0480). 8.6060 1180.236 Starline Services Limited 1180.236 08/10/2017 13/12/2018 0 07/02/2019  
4 NCC2-11 Re-construction of road by RCC with Road Side RCC Drain, from Nobiganj Bazar to Dakesshay Mill. Ch(00-4432m) including some Links 3.9050 791.307 M/S Munia Traders 791.307 23/05/2017 17/10/2018 0 07/02/2019  
5 NCC2-10 (i) Construction of 40.00m long RCC foot over bridge over WAPDA main canal at Ch.0+280km (ii) Construction of 33.00m long RCC bridge over WAPDA main canal at Ch.1+200km (iii) Construction of 38.00m long RCC bridge over WAPDA main canal at Ch.2+130km (iv) Construction of 46.25m long RCC foot over bridge over WAPDA main canal at Ch.2+630km (v) Construction of 34.00m long RCC bridge over WAPDA main canal at Ch. 3+550km (vi) Construction of 37.00m long RCC foot over bridege over WAPDA main canal at Ch.5+150km. 0.2280 3813.800 Mir Habibul Alam-Udayan Builders(JV) 3813.800 25/11/2018 19/03/2020 0 07/02/2019  
6 NCC2-06 Construction of 20m span RCC Luhia Bridge over Nabiganj Khal on Nobiganj Bazar to Dakesshay Mill Road at Chainage 0+350m and 22m span RCC Lakankhola Brige over Lakhankhola Khal on Nobiganj Bazar to Dakesshay Mill Road at Chainage 2+750. 0.0420 556.339 Prominent -Quashem (JV) 556.339 05/03/2017 31/10/2018 0 07/02/2019  
7 NCC2-05 a) Construction of 15m long RCC bridge over WAPDA canal near Lithigarments at ward no-3,; 14m long RCC bridge (Abdul Ali pool) at ward no-2, 10m long RCC culvert near Rahim market at ward-02, b) Reconstruction of 60m long RCC birdge over Shitalakkhya Khal at Shaheed Nagar in ward no-18 c) Reconstruction of 60m long RCC bridge over Shitalakkhya khal at Sayedpur in ward no-18, d) Construction of 12m long RCC bridge over Nolkhali Khal near Knit conern at ward no-10. 0.1320 2098.266 Prominent -Quashem (JV) 2098.266 05/03/2017 31/12/2018 0 07/02/2019  
8 NCC2-04 a) Construction of 18m etre span RCC Tribini Bridge over Tribini Khal on Madanganj power grid to Nabigonj bus stand Road at Chainage 1+735 m. Ward-21 b)Construction of 20m metre span RCC Baparipara Bridge over Baparipara Khal on Madanganj power grid to Nabigonj bus stand Road at Chainage 0+370 m. 0.0380 892.121 Prominent -Quashem (JV) 892.121 05/03/2017 31/12/2018 0 07/02/2019  
9 NCC2-03 Re-construction of road by RCC with Road Side RCC Drain, from Nobiganj Bazar to Dakesshay Mill. Ch(00-4432m) including some Links 16.0490 2841.857 Rana Builders & Hasan Builders (JV) 2841.857 23/05/2017 31/12/2018 0 07/02/2019  
10 NCC2-02 a) Re-habilitation of road & drain with link from lithi garmentsd to dhaka-Chittagong highway road vai london market & Nemai kaisari bazer by RCC in ward-03 Length 1582 & 8 nos. Link road length:2796.0m Total Effective length4378.0m 11.3880 1931.421 M/S Ratna Enterprise 1931.421 08/10/2017 08/11/2018 0 07/02/2019  
11 NCC2-01 a) Improvement of Bhasha Sainik Sarak by RCC with Footpath cum RCC drains in ward no-13 (Ch 0+00 to 0+400.00m), b) Construction of CC road with RCC drain beside Paikpara Big Graveyard in ward no-17 & 18 (Ch 0+00 to 0+700.00m), c)Construction of RCC road & Drain starting from Shantibag Stadium road near EURO Garments upto north line of Islam Nagar WAPDA canal in ward No:08 (Ch 0+00 to 0+ 615m ) . 4.1290 711.250 MAM Construction Ltd 711.250 12/07/2017 30/11/2018 0 07/02/2019  
Total : 62.5890 (Km) 22795.62 (Lac) 22795.62 (Lac)