Project Scheme Detail List
SL No. Package No. Name Length (Km) Allotment (Lac) Name of Contractor Contract Amount (Lac) Date of Commencement Date of Completion Physical Progress (%) Date of Progress Update Remarks
1 Amtali
1 IRIDP-2/BGN/DW-75 (a) Improvement of Munshir hat (Garabunia GPS - Utter Garabunia H/O Kalam Molla Via Chalitabunia & Utter Garabunia GPS [ Atharogachia Union Parasad Calitabunia Golamail Hazir House – 37 no Uttar Calitabunia GPS - Utter Garabunia GPS - Munsir hat road] (Ch.00m - 1000m.) ID NO. 504095317(b) Construction of 03nos 0.625mx0.900m culvert at ch.620m,670m,940m on the same road. 1.0000 61.190 M/S. Parul And Sons 61.190 0 06/05/2019
2 IRIDP-2/BGN/DW-63 Improvement of Aoule nagor-H/O Asoke Ali Molla via H/O Hanif Fakir road.(Ch.00m - 600m.) ID NO. 504095334 0.6000 41.570 M/S Rudra Enterprise 41.570 06/10/2018 100 05/05/2019
3 IRIDP-2/BGN/DW-33 (a)Improvement of Khekuani Bazar-Haridrabaria DKS Dhakile Madrasha via Gulishakhali Bazar&Abdul Gini Dhakile Madrasha. road( Ch.1897m-2400m)(b) Construction of 01nos 0.625mx0.90m culvert at ch.2210m on the same road. 0.5030 28.970 M/S, Musolli Construction 28.970 20/11/2017 100 30/04/2019
4 IRIDP-2/BGN/DW-32 (a)Improvement of Dulpukuria bridge-H/o Awalad Advocate.road ( Ch.00m-600m)(b) Construction of 01nos 0.625mx0.90m culvert at ch.365m on the same road. 0.6000 39.740 Md. Sahidul Islam 39.740 07/06/2017 100 30/04/2019
5 IRIDP-2/BGN/DW-31 (a)Improvement of Gulishakhali UP-Kalagachia Bazar via Fakirkhali GPS.road.(Ch.1750m - 2750m.)(b) Construction of 01nos 4.0mx4.0m culvert at ch.2560m on the same road.(c) Construction of 02nos 0.625mx0.90m culvert at ch.1960m&2350m on the same road. 1.0000 72.220 M/S. Kamal Enterprise 72.220 13/05/2018 100 30/04/2019
6 IRIDP-2/BGN/DW-30 (a)Improvement of Sener hat-Biswaser hat road.(Ch.00m - 1000m.)(b) Construction of 01nos 4.0mx4.0m culvert at ch.968m on the same road.(c) Construction of 02nos 0.625mx0.90m culvert at ch.200m&450m on the same road. 1.0000 70.630 Md. Sahidul Islam 70.630 07/12/2016 100 30/04/2019
7 IRIDP-2/BGN/DW-29 (a)Improvement of Kawnia BC - Loda Khalgora Iron Bridge Via Kawnia High School&GPS & Chalavanga GPS(Chalavanga culvert – Loda khal gora) road ( Ch.1513m-2248m)(b) Construction of 02nos 0.625mx0.90m culvert at ch.1950m & 2230m on the same road. 0.7350 42.600 M/S. Deip Enterprise 42.600 15/02/2018 100 30/04/2019
8 IRIDP-2/BGN/DW-28 Improvement of Locha Battala Sluice gate - Amtali Taltali UZR road.(Ch.4554m - 4984m.) 0.4300 23.930 Md. Nizamuddin 23.930 24/10/2017 100 30/04/2019
9 IRIDP-2/BGN/SDW-20 Improvement of Atharogchia Up-Bauria Sluice road via Dakkhin Sonakhali GPS & Julakher Bazar & East Sonakhali GPS.Road(Ch.4450m-6000m.) 1.5500 88.770 Md. Nizamuddin 88.770 20/05/2018 100 30/04/2019
10 IRIDP-2/BGN/DW-17 (a) Improvement of Khekuani Bazar- Haridrabaria DKS Dhakile Madrasha via Gulishakhali Bazar&Abdul Gini Dhakile Madrasha road ( Ch.2400m-3400m) (b) Construction of 01no 1.60mx1.60m culvert at ch.3150m on the same road. 1.0000 57.640 M/S Md.Delwar Hossain 57.640 23/01/2017 100 30/04/2019
11 IRIDP-2/BGN/DW-11 (a)Improvement of Kawnia BC- Loda Khalgora Iron Bridge Via Kawnia High School&GPS & Chalavanga GPS(Chalavanga culvert – Loda khal gora) road ( Ch.700m-1513m) (b) Construction of 01no 0.625mx0.90m culvert at ch.1360m on the same road. 0.8130 47.930 M/S Masum Billah Enterprise 47.930 13/02/2017 100 30/04/2019
12 IRIDP-2/BGN/DW-10 Improvement of Locha Battala Sluice gate-Amtali Taltali UZR road (Ch. 2400m-3554m) 1.1540 63.500 M/S Afser & Co 63.500 30/06/2017 100 30/04/2019
2 Bamna
1 IRIDP-2/BGN/SDW-71 (a)Improvement of Ramna bridge at Soiyod doctor house to Altaf mashter house road [Ramna Ser E Bangla Secondary School infront of bridge west side main road to sattar Dr.madrasha – Golaghata karaitala bhitulla jam e mosque Dawatala karaitala GPS – Anower khan jame mosque road] (Ch.00m - 1443m.) ID NO. 504194114(b) Construction of 01nos 1.50mx1.50m culvert at ch.675m on the same road.(c) Construction of 02nos 0.625mxm culvert at ch.950m,1080m on the same road. 1.4430 111.880 Md. Golam Sarower 111.880 08/06/2019 10 13/05/2019
2 IRIDP-2/BGN/DW-24 Improvement of Niz Amtali Madrasha RHD – Madu Chairman house UZR (Sonakhali Bazar RHD to Bamna Kholpatua GC road) road ( Ch.00m-1800m) 1.8000 80.610 M/S. Al-Mamun Enterprise LTD 80.610 08/12/2017 100 12/05/2019
3 IRIDP-2/BGN/DW-40 (a)Improvement of Bamna UP – Sonakhali Bazar via Hanif house road ( Ch.1000m-2200m)(b) Construction of 02nos 1.60mx1.60m culvert at ch.1350m & 1760m on the same road. 1.2000 65.210 M/S. Khan Enterprise 65.210 30/12/2017 100 12/05/2019
4 IRIDP-2/BGN/DW-23 (a)Improvement of Gudighata Bazar-Napitbari Bridge RHD via Hemayet Member Bari road (Ch. 695m – 1770m)(b) Construction of 02nos 0.625mx0.60m culvert at ch.1116m & 1555m on the same road. 1.0750 60.710 M/S. Rupali Construction 60.710 05/03/2017 100 06/05/2019
5 IRIDP-2/BGN/DW-22 (a)Improvement of South side of Chalitabunia Khal - WAPDA Beribandth -House of Hawlader Bari -Laxipura GPS road.(Ch.00m - 1414m.)(b) Construction of 02nos 1.50mx1.50m culvert at ch.400m & 1250m on the same road. 1.4140 85.380 M/S. Rupali Construction 85.380 16/11/2017 100 06/05/2019
6 IRIDP-2/BGN/DW-2 Improvement of Gudighata Bazar-Napitbari Bridge RHD via Hemayet Member Bari road (Ch. 00-695m). 0.6950 38.090 M/S Masum Billah Enterprise 38.090 30/06/2016 100 06/05/2019
7 IRIDP-2/BGN/DW-1 Improvement of Ramna UP-Dawatala UP (Battala Culvert) via Golagata Karaitala GPS road (Ch. 00-690m). 0.6900 37.840 M/S Masum Billah Enterprise 37.840 30/06/2016 100 06/05/2019
3 Barguna-s
1 IRIDP-2/BGN/MW-74 Maintenance of Burirchar UP-Hazarbigha-Kamrabad-Purakata hat Road (Ch.8194m - 10559m.) ID NO. 504473001 2.3650 68.200 M/S. Zitu Enterprise 68.200 0 06/05/2019
2 IRIDP-2/BGN/MW-73 (a)Maintenance of Fuljhuri GC-Gaurichanna-Ghotbaria-Ayla GC road (Ch.5820m - 7820m.) ID NO. 504282008(b) Construction of 02nos 0.625mx0.900m culvert at ch.6130m,6397m on the same road. 2.0000 68.590 M/S. Ema Traders 68.590 17/10/2019 0 06/05/2019
3 IRIDP-2/BGN/DW-68 Improvement of Nali GC-Babugonj GC road. (Ch.6100m-710m) ID NO.504282009(b) Construction of 01 nos 0.625mx0.90m culvert at ch.6285 on the same road. 1.0070 84.980 M/S. Azad Treders 84.980 13/05/2019 45 05/05/2019
4 IRIDP-2/BGN/DW-66 (a)Improvement of Nali GC-Babugonj GC road.(Ch.4600m - 6100m.) ID NO. 504282009(b) Construction of 04nos 0.625mx0.90m culvert at ch.560m,740m,980m,1195 on the same road. 1.5000 119.950 M/S. Shamdder Construction 119.950 13/06/2019 45 05/05/2019
5 IRIDP-2/BGN/DW-61 (a)Improvement of Rayer Tabak High School West Side Forhad Forazir Bari Via Golbunia Bazar road.(Ch.00m - 800m.) ID NO. 504285283(b) Construction of 01nos 1.50mx1.50m culvert at ch.04m on the same road.(c) Construction of 03nos 0.625mx0.60m culvert at ch.300m,430m & 760m on the same road. 0.8000 58.430 M/S. Mithun Traders 58.430 30/05/2019 70 05/05/2019
6 IRIDP-2/BGN/DW-59 (a)Improvement of Barguna-Chalitatali UZR (Shop of Sekander Mistree)-Chanderhat UNR road.(Ch.00m - 1700m.) ID NO. 504285324(b) Construction of 02nos 1.0mx1.0m culvert at ch.630m & 993m on the same road.(c) Construction of 01nos 0.625mx0.90m culvert at ch.140m on the same road. 1.7000 117.320 M/S. Mithun Traders 117.320 30/05/2019 70 05/05/2019
7 IRIDP-2/BGN/MW-54 Maintenance of Parir khal GC - Babugong GC road .(Ch.12350m - 14010m.) ID NO. 504282006 1.6600 38.630 Md. Golam Kibria 38.630 10/07/2018 50 05/05/2019
8 IRIDP-2/BGN/DW-62 (a)Improvement of Napilkhli WDB-Batala Madrasha road.(Ch.00m - 1350m.) ID NO. 504285015(b) Construction of 04nos 0.625mx0.90m culvert at ch.70m,153m,420m & 905m on the same road. 1.3500 89.390 M/S. Mithun Traders 89.390 12/12/2018 100 05/05/2019
9 IRIDP-2/BGN/DW-60 (a)Improvement of Bhutmara khalgora-Sluice gate ( Monoshatoli GPS) road.(Ch.00m - 1000m.) ID NO. 504285039(b) Construction of 02nos 0.625mx0.60m culvert at ch.167m & 730m on the same road. 1.0000 64.820 M/S Poly Construction 64.820 11/11/2018 100 05/05/2019
10 IRIDP-2/BGN/DW-27 (a)Improvement of Babugonj GC- Padma (Sonatola ) road.(Ch.00m - 2000m.)(b) Construction of 01nos 0.625mx0.60m culvert at ch.720m on the same road.(c) Construction of 01nos 3.0mx3.0m culvert at ch.1643m on the same road. 2.0000 100.720 M/S. Humayun Enterprise 100.720 30/06/2018 100 05/05/2019
11 IRIDP-2/BGN/DW-25 (a)Improvement of Bushbunia UZR - Kalirtabok Sluice - Rayertabok H/S (Cyclone Shelter) road.(Ch.00m - 650m.)(b) Construction of 02nos 0.625mx0.60m culvert at ch.200m & 253m on the same road. 0.6500 42.880 M/S, Musolli Construction 42.880 30/04/2018 100 05/05/2019
12 IRIDP-2/BGN/MW-58 (a)Maintenance of Razzak Master House - Naltona UHC road.(Ch.00m - 500m.) ID NO. 504285219(b) Construction of 01nos 0.625mx0.60m culvert at ch.120m on the same road. 0.5000 12.760 M/S. Khan Enterprise 12.760 05/06/2018 100 05/05/2019
13 IRIDP-2/BGN/MW-56 Maintenance of Burirchar UP-Hazarbigha-Kamrabad-Purakata hat road .(Ch.4500m - 5500m.) ID NO. 504283001 1.0000 27.960 M/S. Mithun Traders 27.960 15/01/2018 100 05/05/2019
14 IRIDP-2/BGN/MW-55 Maintenance of Barguna UZ HQ - Kakchira GC Via Fuljhuri GC Road(Sadar Part) road .(Ch.9250m - 10250m.) ID NO. 504282003 1.0000 26.930 Md. Golam Kibria 26.930 15/01/2018 100 30/04/2019
15 IRIDP-2/BGN/DW-53 (a)Improvement of Maitha GPS East Side - Kaderer Pule road .(Ch.00m - 1715m.) ID NO. 504285289(b) Construction of 02nos 0.625mx0.60m culvert at ch.100m& 360m on the same road. 1.7150 95.350 M/S. Mithun Traders 95.350 06/05/2018 100 30/04/2019
16 IRIDP-2/BGN/DW-52 (a)Improvement of Baro Labangola WDB-Khorshed Ali House road .(Ch.00m - 1750m.) ID NO. 504284010(b) Construction of 03nos 0.625mx0.60m culvert at ch.950m,1150m& 1360m on the same road. 1.7500 98.720 M/S. Mithun Traders 98.720 05/04/2018 100 30/04/2019
17 IRIDP-2/BGN/DW-51 (a)Improvement of Bara Labangola-Sonakhali Pourashava road.(Ch.00m - 2725m.) ID NO. 504284008(b) Construction of 05nos 0.625mx0.60m culvert at ch.246m,846m,1365m,2178m & 2390m on the same road.(c) Construction of 01nos 2.0mx2.0m culvert at ch.1669m on the same road. 2.7250 162.560 M/S. Mithun Traders 162.560 27/03/2018 100 30/04/2019
18 IRIDP-2/BGN/DW-50 (a)Improvement of Cotto Gourichanna Dakhil Madrasha-Azimuddin House road.(Ch.1000m - 1400m.) ID NO. 504285145(b) Construction of 01nos 0.625mx0.60m culvert at ch.1060m on the same road. 0.4000 19.870 M/S. Palli Stores,Pro. Md. Golam Sawrar (Badal) 19.870 09/01/2018 100 30/04/2019
19 IRIDP-2/BGN/DW-26 (a)Improvement of Keorabunia UP-Ayla GC-Sonarbangla-Naya Hat-Purakata hat road.(Ch.9250m - 10250m.)(b) Construction of 02nos 0.625mx0.60m culvert at ch.9562m & 10090m on the same road. 1.0000 60.530 M/S. Humayun Enterprise 60.530 15/02/2018 100 30/04/2019
20 IRIDP-2/BGN/MW-16 Maintenance of Keorabunia RHD-Ghatbaria Hat-Chandukhali GC, road (Ch. 5600m-7345m) 1.7450 45.180 M/S Md.Delwar Hossain 45.180 06/10/2016 100 30/04/2019
21 IRIDP-2/BGN/MW-16 Maintenance of Keorabunia RHD-Ghatbaria Hat-Chandukhali GC, road (Ch. 5600m-7345m) 1.7450 45.180 M/S Md.Delwar Hossain 45.180 06/10/2016 100 30/04/2019
22 IRIDP-2/BGN/DW-15 (a)Improvement of Parirkhal GC-Chalitatali GC-Chowmuhoni-Nali (Chalitatali Chowmuhoni Part) GC Road.(Ch.6965m-7870m.) (b) Construction of 01no 0.625mx0.60m culvert at ch.7500m on the same road. 0.9050 64.020 M/S Limon traders 64.020 05/12/2016 100 30/04/2019
23 IRIDP-2/BGN/DW-9 (a)Improvement of Khajurtala RHD-Dakhhin Khajurtala GPS-Kumrakhali S K Roy GPS-Bowalkar GCC (Khajurtala –Kumarkhali Ali mia house)Road.(Ch.300m-2300m.) (b) Construction of 04nos 0.625mx0.90m culvert at ch.1660m,1960m 2064m& 2210m on the same road. 2.0000 93.610 M/S. Kamal Enterprise 93.610 02/11/2016 100 30/04/2019
4 Betagi
1 IRIDP-2/BGN/SDW-72 (a)Improvement of Betagi UPC-Laxmipura Bazar (Ch.3300m - 4635m.) ID NO. 504473001(b) Construction of 02nos 2x3.0mx3.0m culvert at ch.4425m,4590 on the same road.(c) Construction of 01nos 0.625mx0.900m culvert at ch.4210m on the same road. 1.3350 122.930 M/S. Asia Enterprise 122.930 25/06/2019 10 13/05/2019
2 IRIDP-2/BGN/SDW-70 (a)Improvement of Laxmipura Madrasha(Laxmipur Bazar)-Bibichini UNR via Khalifabari road.(Ch.585m - 2850m.) ID NO. 504474144(b) Construction of 02nos 3.50mx3.50m culvert at ch.1833m & 2383m on the same road.(c) Construction of 01nos 2.60mx2.00m culvert at ch.2257m on the same road. 2.2650 202.680 M/S. Mubin Traders 202.680 14/11/2019 25 13/05/2019
3 IRIDP-2/BGN/SDW-65 Improvement of Aurbunia Kheyaghat(UZR) - Niamati khal Via Pollymongol Bazar road.(Ch.1010m - 1430m.) ID NO. 504474018 & Link road 85.0m 0.5050 30.910 M/S. R S Business Center 30.910 30/07/2019 50 13/05/2019
4 IRIDP-2/BGN/DW-57 Improvement of Bibicini UP – Katakhali scluice ghat bazar road.(Ch.1880-2600m.) ID NO. 504474263Construction of 2 nos. 0.625mX0.900m Culvert at Ch. 1100m & 2050m on the same road.Construction of 1 no. 3.00mX3.00m Culvert at Ch. 1883m on the same road. 0.7200 45.040 45.040 30/05/2019 50 13/05/2019
5 IRIDP-2/BGN/DW-47 Improvement of Betagi UP(Utter RanipurGPS)-Jagaikhal Bazar(Police Inspection Centre)road.(Ch.00m - 1470m.) ID NO. 504474233(b) Construction of 01nos 0.625mx0.90m culvert at ch.1100m on the same road. 1.4700 96.070 M/S. Tareque Enterprise 96.070 30/06/2019 50 13/05/2019
6 IRIDP-2/BGN/DW-46 Improvement of Betagi UZ HQ-Badnikhali GC road.(Ch.2700m - 3627m.) ID NO. 504472003 0.9270 50.000 Rafiq Construction Co. (Pvt.) Ltd 50.000 30/12/2018 70 13/05/2019
7 IRIDP-2/BGN/DW-45 Improvement of Aurbunia Kheyaghat(UZR) - Niamati khal road.(Ch.00m - 1010m.) ID NO. 504474018 1.0100 56.050 Rafiq Construction Co. (Pvt.) Ltd 56.050 30/12/2018 45 13/05/2019
8 IRIDP-2/BGN/DW-43 Improvement of Sharishamuri UP office-Gourichanna via Zumaddar Bari road.(Ch.00m - 893m.) ID NO. 504474262 0.8930 49.020 M/S. Khan Enterprise 49.020 31/03/2019 70 13/05/2019
9 IRIDP-2/BGN/DW-44 Improvement of Karuan Faker Master house- Barguna Betagi RHD road.(Ch.1487m - 2500m.) ID NO. 504474156 1.0130 56.890 Rafiq Construction Co. 56.890 30/12/2018 100 13/05/2019
10 IRIDP-2/BGN/DW-18 Improvement of Mayer Hat (UZR)-Gaurichanna Bazar road.(Ch.2265m - 3121m.) 0.8560 50.000 M/S. Gazi Construction 50.000 27/02/2019 100 12/05/2019
11 IRIDP-2/BGN/DW-13 (a)Improvement of Kawnia RHD (Mobile Tower) - Mirzagonj RHD Via Al Modina Hafizia Madrasha (ch.1080m – 2400m) (b) Construction of 01no 2*3.0m*3.60m culvert at ch.1530 on the same road. (c) Construction of 01no 3.0m*3.0m culvert at ch.1880m on the same road. 1.3200 112.810 M/S. Humayun Enterprise 112.810 07/08/2016 100 12/05/2019
12 IRIDP-2/BGN/DW-49 a) Improvement of Amragasia RHD (Basunda Adasha GPS)-WAPDA Bazar via South Volanathpur GPS road (Ch.00m-700m.) ID NO.504474133(b) Construction of 01nos 2x3.0mx3.0m culvert at ch.298m on the same road. 0.7000 53.480 M/S. Abul Kalam Azad 53.480 30/05/2018 100 12/05/2019
13 IRIDP-2/BGN/DW-42 Improvement of Betagi-Niamati UZR (Putiakhali Bazar) to Gariabunia Bazarroad.(Ch.500m - 1500m.) 1.0000 53.400 53.400 25/01/2018 100 12/05/2019
14 IRIDP-2/BGN/DW-41 Improvement of Kadamtola Bazar- Goalbari Sluicegate road.(Ch.00m - 1900m.) 1.9000 107.020 M/S. Khan Enterprise 107.020 29/03/2018 100 12/05/2019
15 IRIDP-2/BGN/SDW-19 Improvement of Let. Abdus Salam khan (Kasem) Road(Ch.00m-490m.) 0.4900 23.780 M/S Khan Enterprise 23.780 15/05/2017 100 06/05/2019
16 IRIDP-2/BGN/DW-14 (a)Improvement of Buramazumder UP office-Mirzagonj Border via house of Barake Mirdha (ch.880m – 2080m) (b) Construction of 01no 0.625mx0.90m culvert at ch.1180m on the same road. 1.2000 67.780 M/S Khan Enterprise 67.780 11/04/2017 100 06/05/2019
17 IRIDP-2/BGN/DW-5 Improvement of Mokamia UP Office (Masuakhali bazar) – Betagi borguna RHD via Chotto Mokamia-(Battala) road (Ch. 3315-4150m). 0.8350 46.160 M/S Poly Construction 46.160 28/02/2017 100 06/05/2019
18 IRIDP-2/BGN/DW-4 Improvement of Betagi UP-Hosnabad UP Office via Goalbari GPS road (Ch. 6319.5 - 7150m). 0.8305 46.010 M/S Poly Construction 46.010 25/02/2017 100 06/05/2019
19 IRIDP-2/BGN/DW-3 Improvement of Fultala WAPDA Bazar-Shantirhat Bazar-Bibichini UP Office road (Ch. 2850-3744m). 0.8940 48.060 M/S Khan Enterprise 48.060 17/12/2016 100 06/05/2019
5 Patharghata
1 IRIDP-2/BGN/DW-69 Improvement of Patherghata UP (RHD Kazi bari) Khaliferhat via Hatempur Bazar road. (Ch. 710m-2055m) ID NO. 504853017 1.3450 95.900 M/S. Shamdder Construction 95.900 13/05/2019 50 13/05/2019
2 IRIDP-2/BGN/DW-67 (a)Improvement of Charduani GC-Kathaltali UP (RHD) road.(Ch.1226m - 3660m.) ID NO. 504852004(b) Construction of 06nos 0.625mx0.90m culvert at ch.1338m,1678m, 2342m, 2948m, 3038m, 3540 on the same road. 2.4340 202.720 Trinath Kormokar 202.720 19/08/2019 60 13/05/2019
3 IRIDP-2/BGN/DW-48 a) Improvement of Patharghata-Barguna RHD (Alisar More Munshi Bari) Azimpur Bazar via Singrabunia GPS road(Ch.00-1500m)ID NO.504854072(b) Construction of 021nos 0.625mx0.600m culvert at ch.183m & 663m on the same road. 1.5000 88.580 M/S. K.K. Enterprise, Pro. Md. Kabir Hossain 88.580 28/02/2019 60 13/05/2019
4 IRIDP-2/BGN/DW-38 (a)Improvement of Kathaltali UP (Keramotpur RHD) -Kamarer Hat road ( Ch.2950m-4930m)(b) Construction of 02nos 0.625mx0.90m culvert at ch.3694m & 4195m on the same road. 1.9800 121.780 M/S. F.K Construction 121.780 30/05/2019 70 13/05/2019
5 IRIDP-2/BGN/DW-39 (a)Improvement of Patharghata-Kakchira RHD (Akon Bari Battala)-Pachim Kupdhon (Imdad Master Bari) road ( Ch.00m-1700m)(b) Construction of 01nos 1.60mx1.60m culvert at ch.399m on the same road.(c) Construction of 03nos 0.625mx0.90m culvert at ch.295m,1150m & 1360m on the same road. 1.7000 92.590 GM Ikfa Enterprise 92.590 16/07/2018 100 13/05/2019
6 IRIDP-2/BGN/DW-36 (a)Improvement of Charduani UP-Tengra Bazar road (Ch. 4675m – 5875m)(b) Construction of 01nos 0.625mx0.90m culvert at ch.4687m on the same road. 1.2000 71.040 M/S. Modina Traders 71.040 07/12/2018 100 13/05/2019
7 IRIDP-2/BGN/DW-37 (a)Improvement of Nali Bazar-Nachnapara Bazar via North Katakhali Comunity Primary School.road ( Ch.00m-1557m)(b) Construction of 01nos 1.60mx1.60m culvert at ch.785m on the same road.(c) Construction of 01nos 0.625mx0.90m culvert at ch.950on the same road. 1.5570 76.660 M/S. FH Enterprise 76.660 31/12/2017 100 12/05/2019
8 IRIDP-2/BGN/DW-35 (a)Improvement of Old Kalmegha UP-Munshigonj Bazar via Sonali Madrasha road.(Ch.2280m - 3500m.)(b) Construction of 01nos 3.0mx3.00m culvert at ch.2840m on the same road.(c) Construction of 02nos 0.625mx0.90m culvert at ch.2915m& 3100 on the same road. 1.2200 76.010 M/S. Akon Traders 76.010 31/12/2017 100 06/05/2019
9 IRIDP-2/BGN/DW-8 (a)Improvement of Old Kalmega UP-Munsigonj Bazar via Sonali Madrasha road (Ch. 1500-2280). (b) Construction of 01no 1.6mx1.6m culvert at ch.1825m on the same road. (c)Construction of 01no 0.625mx0.60m culvert at ch.2178m on the same road. 0.7800 47.180 M/S Rudra Enterprise 47.180 10/05/2018 100 06/05/2019
10 IRIDP-2/BGN/DW-7 (a)Improvement of Jamirtala (Raton Member house) - House of Harun Mawlana via Keraitala (Altaf Chairman) road (Ch. 00-1375m). (b) Construction of 03nos 0.625mx0.60m culvert at ch.360m,730m & 994m on the same road. 1.3750 64.530 M/S Jami Enterprise 64.530 25/03/2017 100 06/05/2019
11 IRIDP-2/BGN/DW-6 Improvement of Mathertali FRB-Chalabhanga Darber Sharif road (Ch. 00-544m). 0.5440 34.280 M/S Jami Enterprise 34.280 25/03/2017 100 06/05/2019
6 Taltali
1 IRIDP-2/BGN/RDW-34 (a)Improvement of Horinbaria (sanur bridge) – Afzal house via behala GPS road. ( Ch.3000m-4000m) (b) Construction of 03nos 0.625mx0.90m culvert at ch.3005m,3550m&3850m on the same road. 46.330 Ahurujjaman Khan Almas 46.330 20/06/2019 50 05/05/2019
2 IRIDP-2/BGN/DW-64 Construction of Ghatla with 300m Approch road on the bank of Andarmanik at Dhaka Kuakata RHD (Mohipur GC) - Taltali GC road via Nishanbaria kheyaghat. ID NO. 504872014 84.650 M/S. Arif & Asif Construction 84.650 17/04/2019 100 05/05/2019
3 IRIDP-2/BGN/DW-12 (a)Improvement of Taltali-Chairmanhat via Newpara Launchghat, H/O Nasir Mollah & Behala High School (Haribaria sanur bridge - H/O Abjal via Behala GPS) road ( ch.2000m - 3000m) (b) Construction of 02nos 0.625mx0.60m culvert at ch.2325m&3000m on the same road. 1.0000 59.470 M/S Poly Construction 59.470 10/02/2017 100 05/05/2019
4 IRIDP-2/BGN/DW-34 Improvement of Horinbaria (sanur bridge) – Afzal house via behala GPS road. ( Ch.3000m-4000m) 1.0000 18.400 M/S Masum Billah Enterprise 18.400 12/09/2016 100 30/04/2019
5 IRIDP-2/BGN/MW-21 Maintenance of Bogir hat GC-Taltali GC via taltali Digree collage road (Ch.00m-908m) 0.9080 49.790 M/S. Gazi Construction 49.790 30/03/2017 100 30/04/2019
Total : 89.9255 (Km) 5272.99 (Lac) 5272.99 (Lac)