Loading...

Project Scheme Detail List
SL No. Package No. Name Length (Km) Allotment (Lac) Name of Contractor Contract Amount (Lac) Date of Commencement Date of Completion Physical Progress (%) Date of Progress Update Remarks
1 Belkuchi
1 SP12025/Chandi Beel FCD Subproject Re-excavation of Chandi Khal (Ch-0+00km to 0+515km) Re-excavation of Shalakura Khal (Ch-0+00km to 0+600km) Ref. Lined Section 2 Nos. On 2 Khals, And SP Identf. Signboard (2 nos.) Repair & Maintenance work of 1vent (1.2mx1.8m) Regulater -. 19.269 S M Rofiqul Islam 19.269 20/06/2022 16/03/2023 100 13/08/2024 Completed
2 Tarash
1 SP43037/Bhadrabati Khal (North) Subproject Re-Excavation of Uttar Bhadrabati Khal (Ch.0+000 Km to 12+200Km) Construction of 6 Nos. Reference Lined sections, Sub-project Identification sign board 2 Nos. and Sub-project Indication Post 2 Nos. 206.955 LCS-9 206.955 02/03/2023 87 13/08/2024 Ongoing
2 SP43036/Bhadrabari South (Baruhash Khal) Subproject Re-Excavation of Dakshin Vhadrabati Khal(Ch.0+000 Km to 15+295 Km) Const. of 9 Nos. Reference lined Section on 1 Khal and SP Identf. sign board 2 Nos. and SP Indication Post 2 Nos. 209.572 LCS-9 209.572 16/03/2023 91 13/08/2024 Ongoing
3 SP15241/Duar-Nimaichara DR & WCS Subproject Duar-Nimaichara khal re-excavation Referenced line section Duar-Nimaichara khal re-excavation(ch.00-2100m) Referenced line section3nos(ch.100,1000,2000m) Bamboo bridge(3 Nos.) 80.786 Most. Mowazima Khatun Md. Shafiqul Islam 80.786 31/03/2019 30/05/2019 100 13/08/2024 Completed
4 SP14183/Horisona-Kundol WCS Subproject Harisona Kundoil khal re-excavation(ch.2000-6700m) Referenced line section(5 nos) Bamboo bridge(5 Nos.) Harisona Kundoil khal re-excavation(ch.00-2000m) 156.962 LCS 156.962 18/03/2019 30/05/2018 100 13/08/2024 Completed
5 SP14151/Mohisluti Baro Beel DR Subproject Mohisluti Baro Beel khal re-excavation(ch.00-5615m) Referenced line section(6 Nos.) Bamboo Bridge(6 Nos.) 103.754 LCS 103.754 04/04/2019 30/05/2019 100 13/08/2024 Completed
3 Ullapara
1 SP15239/Puthia-Falia FCD Subproject Embank. Re-Section. (Ch: 1165.00-2600.00 m, ch:3000.00-6270.00 m, ch: 9350.00-11850.00 m) Sign Bo 2 Rehabilitation of Regulators (3 nos) at ch.1760m, 4830m, 9450m on Embackment -. 78.714 M/S.Sojib Enterprise.Gikera,Ullapara,Serajgonj. 78.714 04/08/2021 20/03/2022 100 13/08/2024 Completed
2 SP13089/Dahapara-Goyhatta FCD Subproject Re-sectioning of Dohopara-Goyhatta Embankment (Ch: 750 - 4950 m) Subproject Identification signboard (2 nos.) 41.072 LCS-3 41.072 26/02/2020 06/05/2021 100 13/08/2024 Completed
Total : 0.0000 (Km) 897.08 (Lac) 897.08 (Lac)