Loading...

Project Scheme Detail List
SL No. Package No. Name Length (Km) Allotment (Lac) Name of Contractor Contract Amount (Lac) Date of Commencement Date of Completion Physical Progress (%) Date of Progress Update Remarks
1 Bhola-s
1 llp ff 23.000 23.000 80 06/01/2021
2 SA/M-08 A. Maintenance of Alia Madrasha - Kheya ghat (Babul Molla Bridge ) road at Ch.00-680.0mm Road ID- 509184008 (BC Pavement Length 680m) B. Construction of Palisading Work on Alia Madrasha - Kheya ghat (Babul Molla Bridge ) road at Ch. 120-140m L/S (Pound), 360-370m L/S (Pound). Road ID- 509184008 (Length- 210m). C. Construction of (0.75m x 0.75m) RCC Box Culvert on Alia Madrasha - Kheya ghat (Babul Molla Bridge ) road at Ch-57.00m . Road ID- 509184008 0.6800 2079085.000 Kabir & Brothers, 4 Free School Street, Hatirpool, Dhaka. 2079085.000 12/07/2017 04/07/2018 100 05/03/2019
3 SA/M- 293 (A) Maintenance (Site Widening) of RHD (Howlader Hat) - Mukti Camp Road at Ch. 00-1980.0m under Bhola Sadar Upazila. Road ID 509184093 (B) Maintenance (Overly) of Ponditer hat - Wapda (West) Berry Bandth Road. at Ch. 00-1400.0m under Bhola Sadar Upazila. Road ID 509185044 4.0000 162.831   162.831 0 31/12/2018  
4 SA/M- 292 Maintenance (Site Widening) of Shibpur - Charpata via Ratanpur Satalight School Road. at Ch. 00-3146.0m under Bhola Sadar Upazila. Road ID 509185083 3.0000 123.928   123.928 0 31/12/2018  
5 SA/M- 291 (A) Maintenance (Overly) of D.C road to Manik Mia Bari via Katalia Howlader Bari Road Under 7 No- Sibpur Union. at Ch. 00-1500.0m under Bhola Sadar Upazila. Road ID 509185101,(B) Maintenance (Re-Seal) of Shibpur Paccar Matha Hossen Sarder Bari Mosque Road. at Ch. 00-1456.0m under Bhola Sadar Upazila. Road ID 509185045,(C) Maintenance (Overly) of Shibpur DC road-Manike mia bari-shibpur chow muhaie at Ch. 00-1800.0m under Bhola Sadar Upazila. Road ID 509185033 5.0000 132.545   132.545 0 31/12/2018  
6 SA/M/SE-24 Surface Enhancement of Bhola Bhola kheya ghat-Kalinath bazar-Dorgar road-Bypass-Ponditer pool-Gozaria GC road at CH- 00-4030.00m Road ID- 509182010 4.0000 133.491   133.491 0 31/12/2018  
7 SA/STR-283 Construction of (3.0x4.50x4.50m) (W-5.50m 3 Vent) RCC Box Culvert on RHD (Howladar Hat) –Mukti Camp road at CH- 1120.00m Under Bhola Sadar , Upazila Dist Bhola. Road ID 509184093 61.335   61.335 0 31/12/2018  
8 SA/STR-258 Construction of 44m Long RCC Girder Bridge on Bankerhat GC – Lahar hat RHD via Char Chatkimara (Bhola Sadar Portion) at Ch.4750.00m under Sadar Upazila. Dist, Bhola (509182017) 363.749   363.749 0 31/12/2018  
9 SA/STR-257 Construction of 44m Long RCC Girder Bridge on Bankerhat GC – Lahar hat RHD via Char Chatkimara (Bhola Sadar Portion) at Ch.4557.00m under Sadar Upazila. Dist, Bhola (509182017) 362.955   362.955 0 31/12/2018  
10 SA/STR-256 Construction of 52m Long RCC Girder Bridge on Banker hat GC – Lahar hat RHD via Char Chatkimara ( Bhola Sadar Portion) at Ch.3961.00 m under Sadar Upazila. Dist, Bhola (509182017) 369.987   369.987 0 31/12/2018  
11 SA/STR-255 Construction of 34m Long RCC Girder Bridge on Banker hat GC – Lahar hat RHD via Char Chatkimara (Bhola Sadar Portion) at Ch.19.00 m under Sadar Upazila. Dist, Bhola (509182017) 333.317 M/S Samata Enterprise, Bhola Sadar, Bhola . 333.317 0 31/12/2018  
12 SA/STR-252 Construction of 44.0m RCC Girder Bridge on Velumia Bazar (UPC) - Sharif Khan Bazar – Bauphal Lunch Ghat Road Under Velumia UP at CH- 4200.0m Road ID 509183008 364.529 M/S Priyonti Construction, Holding No-1409, Gazipur road, Bhola. 364.529 0 31/12/2018  
13 SA/R-251 (A) (1) Improvement of Pairkhan road-jonpure Mirsaheb EIDgha-colghat road (Hawladar Bari-Bodi Doctor Bari-Mokhu Kha Bari) at Ch. 00-1065m under Bapta UP. (Effective Length-1065.0m) Road ID 509185080 (2) Construction of Palisading Work on the Same road (Effective Length-281.00m) (3) Construction of 3 no RCC (1.50m x 1.50m) Box Culvert on the Same road at CH- 30m, 102m & 800m (4) Construction of 3 no RCC (0.75x0.75) Box Culvert on the Same road at CH- 30/102/800 (B) Constrcution of (2x4.0x4.0) (W-5.50) on Bhola-Gazaria GC road under Alinagar UP from CH- 00.0m Road ID 509182015 (C) (1) Improvement ( Side Widening) of Kabi Mozzmel Hoque Bari - Tobgi Road. under Bapta UP at CH- 00-2400.0m (Effective Length- 2400.0m) Road ID 509184005 (2) Construction of 4 no RCC (1.50 x 1.50m) Box Culvert on the Same road at CH- 800m, 945m, 1390m &1500m (3) Construction of 4 no RCC (0.750x0.750m) Box Culvert on the Same road at CH- 290m, 510m, 1691m & 1800m (D) (1) Improvement of ( Side Widening) Mazir hat - Taker hat Road. Ch.00m-3130.0m under Veduria UP. Road ID 509184045 (2) Construction of 2 no RCC (1.50x1.50m) Box Culvert on the Same road at CH- 1110/1340.0m 7.0000 474.027 M/S Sayem Enterprise,Kalinath Bazar, Bhola Sadar, Bhola 474.027 0 31/12/2018  
14 SA/R-250 (A) (1) Improvement of ( Side Widening) Purbo Ilisha UP RHD Tultuli-Sudurchar khal (Bridge) via Kali bayati bari road from ch: 00-1800m. (Effecetive Length - 1800.0m ) Road ID 509185135 (Old) 509185146 (New) (2) Construction of 3 no RCC (1..50 x 1.50m) Box Culvert on the Same road at CH- 440m, 600m & 1224m (B) (1) Improvement ( Side Widening) of Dania Up - Bekego Bari Very Bath Road(Site Widing) at Ch. 00-1500m under Dhani UP (Effective Length- 1500.0m) Road ID 509185154 (2) Construction of 2 no RCC (0.750x0.750m) Box Culvert on the Same road at CH- 433.0m & 1400.0m (C) (1) Improvement of ( Side Widening) Shibpur Salauddin dokan-Abdul Hoque bari road at CH- 00-1100.0m (Effective Length - 1100.0m ) Road ID 509185217 (2) Construction of 2 no RCC (1.50 x 1.50m) Box Culvert on the Same road at CH- 1250m & 1450.0m 4.0000 324.288 Md. Zakir Hossain,Masum Khanam Road,Bhola 324.288 0 31/12/2018  
15 SA/R-249 (A) (1) Improvement by HBB of Babul Molla Bridge Road - Malkanda – Bhola Kheya ghat Road. at Ch. 1000-1935.0m under Paschim Ilisha UP. ( Effective Length- 935.0m) Road ID 5090184084 (2) Construction of 2 no RCC (1.50 x 1.50m ) Box Culvert on the Same road at CH- 1110.0m & 1340.0m (B) (1) Improvement of Ilisha UP R&H to Shantir hat WAPDA Very bandh road Ilisha UP raod at CH- 850-1850m.( Effective Length-1000.0m) Raod ID 509184031 (2) Construction of Palisading Work on the Same road (Effective Length-290.00m) (3) Construction of 3 no RCC (1.50x1.50) Box Culvert on the Same road at CH- 928m, 1100m, & 1310m (4) Construction of 2 no RCC (0.75x0.75) Box Culvert on the Same road at CH- 1540m & 1605m (C) Improvement ( Side Widening) of Bhola Parangonj – Pangashia FRB road to Talukder Char Bridge via Guptamunshi – Char Algi – Talukder hat Road. Ch.00m-2850.0m under East Ilisha UP.( Effective Length-2850.0m) Raod ID 509185108 5.0000 346.737 Nabarun Traders Limited Khaier Hat, Borhanuddin, Bhola 346.737 0 31/12/2018  
16 SA/R-248 (A) (1) Improvement by HBB of Banker hat GC – Lahar hat RHD via Char Chatkimara ( Bhola Sadar Portion) Road. Ch 00-480 & .2450-4550.00m under Veduria UP. (HBB Road, Effective Length -2580m) Road ID – 509182017 (2) Construction of 3 no RCC (2.0m x 2.0m) Box Culvert on the Same road at CH- 2850m, 3225m & 3580m (B) (1) Improvement of Ilisha RHD-sonadugi Mosque(Sogirer Dokan South East Ilisha - Mosraf Hossain Rari Bari-Ilih RHD) Ch.00m-1610.00m under East Ilisha UP (Effective Length - 1610.0m) Road ID – 509184046 (2) Construction of Palisading Work on the Same road at CH- 150-1590.0 m (Effective Length-453.00m) (3) Construction of 6 no RCC (1.50m x 1.50m) Box Culvert on the Same road at CH- 270m, 400m, 587m, 722m, 1087m & 1520m(4) Construction of 6 no RCC (0.750 x 0.750) Box Culvert on the Same road at CH- 672m, 762m, 987m, 1144m, 1210m, & 1373m. (5) Construction of RCC (2x4.50x4.50) Box Culvert on the Same road at CH- 985m. 10.0000 480.652   480.652 0 31/12/2018  
17 SA/M- 282 Maintenance work of Bhola-Charfassion RHD(Mollah bari)-Gazaria GC via Shahid Salam high school Road at CH- 00-2750.0m Road ID 509182016 (Effective Length- 2750.0m) 2.0000 120.980   120.980 0 31/12/2018  
18 SA/M- 281 Maintenance work of Bhola-Charfassion RHD (Mollah bari)-Gazaria GC via Shahid Salam high school Road at CH- 2750-4880.0m Road ID 509182016 (Effective Length- 2130.0m) 3.0000 166.006 M/S Eli Enterprise, Sadar Raod Bhola 166.006 0 31/12/2018  
19 SA/M- 270 Maintenance work of Shibpur Santir Hat Madrasha -Alauddin Mazi Bari- Harun Mazi bari(Madua Up Border) Road from Ch.00-1500m under Bhola Sadar Upazila (509185174) Maintenance work of Degir parar Mosque- Mazer Bari- Rokeya Pry. School Road from Ch.00-1400m under Bhola Sadar Upazila (509185170) Maintenance work of Algi Te Maiha-Nasir Majhi Madrasha Road from Ch. 00-1760m under Bhola Sadar Upazila (509185009) 6.0000 159.516 Md. Bahlul Karim, RHD Bhola Sadar, Bhola.. 159.516 0 31/12/2018  
20 SA/M- 269 Maintenance work of Hazir hat-Porir hat Road from Ch.00-1765m under Bhola Sadar Upazila (509184062) Maintenance work of Agarpole-Muslime para-Abu doctor bari Road from Ch.00-350m under Bhola Sadar Upazila (509185091) Maintenance work of Shibpur (dak bangla)-al-haz jalal ahmed school Road from Ch.00-1310m under Bhola Sadar Upazila (509185221) 3.0000 124.216 M/S Prince Enterprise, Collage Road, Poura Kathali, Bhola. 124.216 0 31/12/2018  
21 SA/M- 268 Maintenance work of Char Gazi Bazar- Hatem Ali Reg Pry. School - Helal Member Bari Road from Ch. 00-2300m under Bhola Sadar Upazila (509185168) 2.0000 142.591 M/S Eli Enterprise, Sadar Raod Bhola.. 142.591 0 31/12/2018  
22 SA/M- 267 Maintenance work of Agor pole road-Altazer Rahaman college Road from Ch.00-1770m under Bhola Sadar Upazila (509184050) Maintenance work of Ukil Bari-Chachra school Payer khan Road from Ch. 00-1280m under Bhola Sadar Upazila (509184028) 3.0000 147.269 Md. Bahlul Karim, RHD Bhola Sadar, Bhola. 147.269 0 31/12/2018  
23 SA/M- 266 Maintenance work of bapta Burir Mosque to Weast Piar khan Road from Ch.00-2110m under Bhola Sadar Upazila (509184024) 2.0000 114.771 M/S Shad Jahan Enterprise, South Charnoabadh Bhola Sadar, Bhola. 114.771 0 31/12/2018  
24 SA/M- 265 Maintenance work of Kheyaghat bridge-shere Bangla RPS-Nazir Majee khayghat Road from Ch.00-4700m under Bhola Sadar Upazila (509184044) 5.0000 189.405 M/S Eli Enterprise, Sadar Raod Bhola 189.405 0 31/12/2018  
25 SA/M- 264 Maintenance work of Bhola-Ilisha RHD (Mohajan bari)-Tulatali via porir hat Road from Ch.00m-2500m under Bhola Sadar Upazila (509184069) 3.0000 145.829 M/S Ruhul Amin, Amin Villa, Muslim Para Bhola Sadar, Bhola. 145.829 0 31/12/2018  
26 SA/M- 263 Maintenance work of Charkali-Majeer hat Road from Ch. 00-3140m under Bhola Sadar Upazila (509184042) 3.0000 147.967   147.967 0 31/12/2018  
27 SA/M- 262 Maintenance work of Charkali-Luzarhat-natun hat-Nazirmazi kheyaghat Road from Ch. 00m-4600m under Bhola Sadar Upazila (509184049) 5.0000 233.191 Salahuddin Lincon, Kalibari Road, Bhola Sadar, Bhola. 233.191 0 31/12/2018  
28 SA/M-26 Maintenance of Teli bari (Nabipur)-Giringi bazar. (Site Wading) at Ch. 00-1790.0m (Length- 1790.0m) Road ID- 509184016 Construction of Palisading work on Teli bari (Nabipur)-Giringi bazar. (Site Wading) at Ch. 10-24m LS, 117-132 LS, 195-206 LS, 402-408 RS, 746-774 RS, 1211-1245 LS, 1260-1287 BS, 1503-1515 RS, 1660-1675 RS. (Length- 189.0m) Construction of 2 no Cross Drain on Teli bari (Nabipur)-Giringi bazar. (Site Wading) at Ch. 570m & 1270m 2.0000 53.640 Salahuddin Lincon, Kali bari Road, Bhola Sadar, Bhola 53.640 25/10/2017 17/07/2018 100 31/12/2018 Final Bill Payment
29 SA/R-96 Improvement of Maler hat Rice Mill - Bokshi Bari – Rastermatha Bridge Connecting Road. Ch.1000m-2000m under East Ilisha UP (Length- 1000m. Road ID- 509185123) Construction of Palisading Work on Maler hat Rice Mill - Bokshi Bari – Rastermatha Bridge Connecting Road. at CH- 1190-1205m R/S, 1920-1970m R/S (Length- 65m) Construction of 2 no (0.75m x 0.75m) RCC Box Culvert on Maler hat Rice Mill - Bokshi Bari – Rastermatha Bridge Connecting Road.at CH- 1600m & 1920m Construction of 2 vent (3m x 3m) RCC Box Culvert on Maler hat Rice Mill - Bokshi Bari – Rastermatha Bridge Connecting Road.at CH- 1390m 1.0000 95.715 Nabarun Traders Limited and H.L Corporation JV House#18/7, Basiruddin Road, Kalabagan, Dhaka 95.715 22/01/2018 21/01/2018 100 31/12/2018 Final Bill Payment
30 SA/R-100 Improvement of Sadur char gangaliar hat-norona road via Dulamiar bari road at Ch. 00-1850m (Length- 1850m. Road ID- 509184053) Construction of Palisading Work on Sadur char gangaliar hat-norona road via Dulamiar bari road. at CH- 40-60 RS, 270-300 RS, 320-400 RS, 500-530 LS, 550-580 LS, 600-635 LS, 640-670RS, 700-725 RS, 800-825 RS, 1030-1060RS, 1120-1150 LS, 1330-1360 LS, 1410-1480 LS, 1520-1540 RS, 1600-1620 LS (Length- 565.00m) Construction of 3 no (1.50m x1.50m) RCC Box Culvert on Sadur char gangaliar hat-norona road via Dulamiar bari road .at CH- 103m , 900m, 1350mConstruction of 3 no (0.75m x 0.75m) RCC Box Culvert on Sadur char gangaliar hat-norona road via Dulamiar bari road .at CH- 103m , 900m, 1350m Construction of (4.50m x 4.50m) RCC Box Culvert on Sadur char gangaliar hat-norona road via Dulamiar bari road .at CH- 1405m 2.0000 214.202 Md. Zakir Hossain, 830, Sadar, Bhola 214.202 17/01/2019 16/01/2019 100 31/12/2018 Carpeting Completed
31 SA/R-140 Improvement of Closser Berry Bandth – Annanda bazar (Hazipur School)-Mehendiganj Border road under Rajapur UP Road at Ch. 00-1620.0m (Road ID-509185178) (Length-1620.0m) Construction of Palisading work on Closser Berry Bandth – Annanda bazar (Hazipur School)-Mehendiganj Border road under Rajapur UP Road at Ch. 00-1620.0m (Length-227.0m) Construction of (1.50m x 1.50m) RCC Box Culvert on Closser Berry Bandth – Annanda bazar (Hazipur School)-Mehendiganj Border road under Rajapur UP Road at Ch. 380.0m 2.0000 89.438 Md. Zakir Hossain, 830, Sadar, Bhola 89.438 31/01/2018 30/01/2019 100 31/12/2018 Final Bill Payment
32 SA/R-124 Improvement of Tunu Chowdarir Bridge - Magedpur cyclone Shelter Road at Ch. at CH- 00-1100.0m (Road ID- 509185164) (Length- 1100.0m) Construction of Tunu Chowdarir Bridge - Magedpur cyclone Shelter Road at CH- (Length- 121.0m) Construction of (3 x 4.50m X 4.50m ) RCC Box Culvert on Tunu Chowdarir Bridge - Magedpur cyclone Shelter Road at CH- 105.0mConstruction of (1.50m X 1.50m) no Tunu Chowdarir Bridge - Magedpur cyclone Shelter Road at CH-645.0m Construction of 4 no (0.75m x 0.75m) no Tunu Chowdarir Bridge - Magedpur cyclone Shelter Road at CH-530m, 580m, 800m 1.0000 131.172 Md. Zakir Hossain, 830, Sadar, Bhola 131.172 11/02/2018 10/02/2019 100 31/12/2018 final Bill Payment
33 SA/R-121 Improvement of Valumiya Sahajan member bari-Gusso gram road via Ruhul Amin Miar bari road at CH- 00-1000.0m (Road ID- 509185222) (Length- 1000.0m) Construction of Palisading Work on Valumiya Sahajan member bari-Gusso gram road via Ruhul Amin Miar bari road at CH- (Length- 456.0m) Construction of (1.50m X 1.50m) RCC Box Culvert on Valumiya Sahajan member bari-Gusso gram road via Ruhul Amin Miar bari road at CH-440.0m Construction of (2.40m X 2.40m) no Valumiya Sahajan member bari-Gusso gram road via Ruhul Amin Miar bari road at CH-530.0m 1.0000 111.122 Md. Zakir Hossain Masum khanam Road Bhola 111.122 31/01/2018 30/01/2019 60 31/12/2018 AS on going
34 SA/R-01 A. Improvement of Velumia Bazar - Bisso Road - Hadis Faragir Mosques Road Ch.00m-1000m Road ID: 509185167 (BC Pavement). B. Construction of Palisading Work on Velumia Bazar - Bisso Road - Hadis Faragir Mosques Road at Ch.82-109m R/S, 188-200m R/S, 330-395m R/S, 485-500m L/S, 506-519m L/S, 859-875m L/S, 942-962m L/S. Road ID: 509185167 (Lenght168m). C. Construction of Cross Drain on Velumia Bazar - Bisso Road - Hadis Faragir Mosques Road Ch.596.00m. Road ID: 509185167 1.0000 67.189 Md. Ruhul Amin, Amin Vila, Muslimpara, Bhola Sadar, Bhola. 67.189 25/06/2017 17/03/2018 100 31/12/2018 Final Bill Payment
35 SA/R-49 Improvement of Char Samaiya Kalimuddin Chairman bari-Munshi bari road at ch- 00-870.00m Road ID 5509185232Construction of Palisading Work on Char Samaiya Kalimuddin Chairman bari-Munshi bari road at ch-7-32m BS, 197-210m BS, 720-746m RS, 839-855m LS (Total Length- 118.0m). Construction of (1.50mx1.50m) RCC Box Culvert on Char Samaiya Kalimuddin Chairman bari-Munshi bari road at ch- 303.0m Construction of 2 no RCC Cross Drain on Char Samaiya Kalimuddin Chairman bari-Munshi bari road at ch- 116& 770m 1.0000 57.187 Md. Ruhul Amin, Amin Vila, Muslimpara, Bhola Sadar, Bhola. 57.187 16/10/2017 08/07/2018 100 31/12/2018 Final Bill Payment
36 SA/M-10 A.Maintenance of Ponditer pole-Hassain member bari Berry Bandh Ekata Brick field road at CH-00-1660.0m Road ID- 509185031 (BC Pavement Length 1660m B. Construction of Palisading Work on Ponditer pole-Hassain member bari Berry Bandh Ekata Brick field road at CH- 82-92m R/S, 156-170 m L/S, 354-360 m R/S, 375-390 m R/S, 438-466 m R/S, 530-555 m R/S, 700-725 m L/S, 719-754 m R/S, 760-786 m L/S, 764-786 m R/S, 998-1009 m R/S, 1023-1087 m L/S, 1093-1115 m R/S, 1131-1145 m L/S, 1306-1316 m R/S, 1368-1378 m L/S, 1425-1470 m R/S, 1555-1571 m L/S. Road ID- 509185031 (Length- 398m). C. Construction of 3 no cross Drain on Ponditer Ponditer pole-Hassain member bari Berry Bandh Ekata Brick field road at CH- 750m, 768m & 1172m Road ID- 509185031 2.0000 60.645 Md. Ruhul Amin, Amin Vila Muslimpara, Bhola Sadar Bhola. 60.645 12/07/2017 04/04/2018 100 31/12/2018 Final Bill Payment
37 SA/R-41 Improvement of Shibpur - Montaz Bapari Bari – Dulal Bari Pusti Bari Road at CH- 00-750.00m (BC Pavement Length - 750m). Road ID- 509185219 Construction of Palisading Work on Shibpur - Montaz Bapari Bari – Dulal Bari Pusti Bari Road. at Ch. 8-40m LS, 96-107m LS, 372-387m LS, 402-412m RS, 447-462m LS, 558-573m LS. (Length- 98m). Construction of 6 no RCC Cross Drain on Shibpur - Montaz Bapari Bari – Dulal Bari Pusti Bari Road. at Ch.- 35m, 119m, 160m, 452m, 477m, 558m. 1.0000 48.603 Md. Ruhul Amin, 8300, Sadar, Bhola 48.603 20/11/2017 12/05/2018 70 31/12/2018 WBM Completed
38 SA/R-122 Improvement of Valumiya Sahajan member bari-Gusso gram road via Ruhul Amin Miar bari road at CH- 1000-2000.0m (Road ID- 509185222) (Length- 1000.0m) Construction of Palisading Work on Valumiya Sahajan member bari-Gusso gram road via Ruhul Amin Miar bari road at CH- (Length- 170.0m) Construction of (3 x 4.50m X 4.50m ) RCC Box Culvert on Valumiya Sahajan member bari-Gusso gram road via Ruhul Amin Miar bari road at CH-1102.0m Construction of (1.50m X 1.50m) no Valumiya Sahajan member bari-Gusso gram road via Ruhul Amin Miar bari road at CH-1500.0m 1.0000 127.211 Md. Rubel Enterprise, Vaduria, Bhola Sadar, Bhola 127.211 26/04/2018 17/04/2019 0 31/12/2018  
39 SA/R-158 Improvement of Charsamaya UP Office – Bapta Union Border via by pass Road. at Ch. 00-1900.00m (Length – 1900.0m) Road ID- 509184032Construction of Palisading Work on Charsamaya UP Office – Bapta Union Border via by pass Road. at Ch. 00-1900.00m (Effective Length – 806.0m) Construction of 2 no (1.50m x1.50m) RCC Box Culvert on Charsamaya UP Office – Bapta Union Border via by pass Road. at Ch. 905.0m & 1800.0m Construction of 3 no (0.750m x0.750m) RCC Box Culvert on Charsamaya UP Office – Bapta Union Border via by pass Road. at Ch. 1030.0m, 1620.0m & 1725.0m 2.0000 168.724 Md. Nazrul Islam Chunnu, Ali nagar, Bhola Sadar, Bhola 168.724 17/04/2018 08/04/2019 80 31/12/2018 WBM on going
40 SA/R-157 Improvement of Maler Hat Bridge to Rustom Ali Mia Brick Field Road at Ch. 00-1020.0m (Length – 1020.0m) Road ID -509185109Construction of Palisading Work on Maler Hat Bridge to Rustom Ali Mia Brick Field Road at Ch. 00-1020.0m (Effective Length – 508.00m) Construction of 2 no (0.750m x0.750m) RCC Box Culvert on Maler Hat Bridge to Rustom Ali Mia Brick Field Road at Ch. 206m & 766m 1.0000 89.586 Md. Mohshin Nagar, 1 No. Woard, Bhola Sadar, Bhola 89.586 17/04/2018 08/04/2019 40 31/12/2018 AS on going
41 SA/R-101 Improvement of Pangashia GC -Char Illisha Talukder GPS Road at Ch. 00-1400m (Length- 1400m. Road ID- 509185159) Construction of Palisading Work on Pangashia GC -Char Illisha Talukder GPS Road at Ch.- 5-30m BS,140-165M RS, 190-215M RS, 240-260M LS, 270-320M LS, 550-590M RS, 600-740M LS, 1000-1040M LS, 1070-1100M LS, 1230-1300M LS (Length- 465m) Construction of 3 no (1.50m X1.50m) RCC Box Culvert on Pangashia GC -Char Illisha Talukder GPS Road at Ch – 560m, 810m, & 980m Construction of 2 no (0.750m x0.750m) RCC Box Culvert on Barister Kachari-Purbo Berry Bandh road at CH- 134m & 920m 1.0000 128.259 Md. Jamal Uddin Golder, 8300 Bhola Sadar, Bhola 128.259 31/01/2018 30/01/2019 100 31/12/2018 final Bill Payment
42 SA/M-28 Maintenance of Dania Munaf Talukder Bari(Madrasha)- Bodi Ker Bari at Ch. 00-850.0m (Length-850.0m) Road ID- 509185155 Construction of Palisading work on Dania Munaf Talukder Bari(Madrasha)- Bodi Ker Bari at Ch. 100-125m L/S, 525-552m L/S, 580-603m L/S, 655-678m L/S, 770-805m L/S. & RS. (Length- 195.0m) 1.0000 25.528 Md. Emdad Hossain, Office Para Bhola Sadar, Bhola. 25.528 18/10/2017 10/04/2018 100 31/12/2018 Final Bill Payment
43 SA/M-165 Maintenance of Charsamaiya Shintar hat road-Notun hat-Nazimuddin Matobbor bari Road at Ch.00-1000m (Side Widing) & 1000-2270m (Effective Length – 2270.00m) Road ID - 509185213 Construction of 3 no’s (1.50m x1.50m) RCC Box Culvert at Ch.- 490m, 745m, 1700m & 1 no (0.750m x 0.750m) RCC Box Culvert at Ch.- 1966.0m on the same road. 2.0000 84.939 Md. Bahalul Karim, 8300, Sadar Road Bhola. 84.939 10/04/2018 02/10/2018 100 31/12/2018 Final Bill Payment
44 SA/M-25 Maintenance of Ilisha RHD ( Pulesher Dokan )- Chowdagor Road at CH- 00-1170m (Length – 1170.0m) road ID - 509185143 Construction of Palisading work on Ilisha RHD ( Pulesher Dokan )- Chowdagor Road at CH-44-64m RS, 250-281 RS, 472-479 RS, 686-700 RS, 852-862 RS, 972-979 LS, 1035-1048 RS, 1077-1106 RS, 1132-1142 RS. (Length – 141.0m) 1.0000 45.279 M/s. Maa Enterprise, Bangla Bazar,Fatema Khanam College Gate, Bhola 45.279 18/10/2017 10/04/2018 100 31/12/2018 Final Bill Payment
45 SA/R-97 Improvement of Bheduria Mesturi Bari pole - Fajlu Gharani Bari via Madday Bheduria RNGPs Road Ch.00m-2000m (Length- 2000m. Road ID- 509185149) Palisading Work (Effective Length – 695.0m) on the same road. Construction of 5 no (1.50m x 1.50m ) RCC Box Culvert on the same road at CH- 617.0m, 1126.0m, 1532.0m 1785.0m & 1950.0m Construction of 4 no (0.625m x 0.625m) RCC U Drain on the same road at CH- 617.0m, 1126.0m, 1532.0m 1785.0m & 1950.0m312.0m, 518.0m 980.0m & 1650.0m 2.0000 206.327 M/S Zakir Hossain, 830 Bhola Sadar, Bhola. 206.327 31/01/2019 0 31/12/2018  
46 SA/R-28 Improvement of Barisal RHD- Ilisha RNGPS-kalu Boati Road. at Ch.00-1500.0m (BC Pavement Length -1500m). Road ID-509185116 Construction of Palisading Work on Barisal RHD- Ilisha RNGPS-kalu Boati Road.. at Ch. 14-44m B/S, 184-227m L/S, 368-423m L/S, 440-460m R/S, 690-720m B/S, 760-785m L/S, 1020-1050m L/S, 1050-1075m, L/S, 1170-1190m L/S, 1420-1470m, L/S. (Length- 348.0m). Road ID-509185116 Construction of 2 nos (1.50m x 1.50m) (With-5.50m) RCC Box Culvert on Barisal RHD- Ilisha RNGPS-kalu Boati Road. at CH- 890m, & 1220m. Construction of 3 nos (.750m x .750m) RCC Box Culvert on Barisal RHD- Ilisha RNGPS-kalu Boati Road. at CH- 960m, 1125m, & 1375m. 2.0000 105.107 M/S Tublu Enterprise, Barishal Sadar, Barishal 105.107 05/10/2017 27/09/2018 100 31/12/2018 final Bill Payment
47 SA/STR-106 Constrcution of 2 vent 3.00m x 3.00m RCC box culvert on Bapta Mushkandi Peyar khan road near East side of Manik Dr. bari road ID No- 509184024 (Length- 6m) 21.783 M/S Tahura Enterprise 21.783 0 31/12/2018  
48 SA/R-212 Improvement of Santir hat Bazar - Sattar Mal Bari - Alamgir Mal Bari Road. Ch.00m- 1360.00m Road ID – 509185185 Palisading work at CH- 90-1275m (Effective Length – 620.0m) on the same road. Construction of 6 no (1.50 x 1.50m) RCC Box Culvert on the same road at CH- 108.0m, 220.0m, 310.0m, 465.0m, 842.0m & 1263.0m Construction of 5 no ( 0.75m x 0.75m) RCC U Drain on the same road at CH- 70.0m, 160.0m, 251.0m, 350.0m, 610.0m 1.0000 116.211 M/S Supti Enterprise, Notun Bazar, Bhola Sadar, Bhola 116.211 0 31/12/2018  
49 SA/M-164 Maintenance of Rajapur UP - (New Proposed) Janata bazar – Roder hat – RHD Junction Road. at Ch. 00-2300.00m Road ID – 509184064 (Effective Length – 2300.00m) Construction of Palisading work on Rajapur UP - (New Proposed) Janata bazar – Roder hat – RHD Junction Road. at Ch. 00-2300.00m (Effective Length – 54.00m) 2.0000 55.496 M/S Supti Enterprise, Notun Bazar, Bhola Sadar, Bhola 55.496 17/04/2018 08/10/2018 100 31/12/2018 Final Bill Payment
50 SA/M-163 Maintenance of Agar pole Road-charshifly by pass road at CH- 00-2700.00m Road ID-509184047 (Effective Length – 2700.00m) 3.0000 58.502 M/S Shanto Entrprise, Holding No- 309 Ukilpara, Bhola. 58.502 17/04/2018 08/10/2018 100 31/12/2018 Final Bill Payment
51 SA/M-166 Maintenance of Abohowa office road-Chodhoghor road via Siraj Maker Bari (Site Widing) at Ch-00-1000m & 1000-1220.0m (Effective Length – 1190.00m) Road ID- 509185081 Palisading Work at CH- 167m-1120m (Effective Length – 277.00m) on the same Road. 1.0000 41.092 M/S Shanto Enterprise, Holding No.309, Ukilpara, Bhola 41.092 15/04/2018 04/10/2018 100 31/12/2018 Carpeting Completed
52 SA/R-125 Improvement of Sadur char camunity school- Colghat Bazar Road at CH- 00-1100.0m (Road ID- 509185158) (Length- 1100.0m) Construction of Palisading work on Sadur char camunity school- Colghat Bazar Road at CH - (Length- 282.0m) Construction of (3.0m x 3.0m ) RCC Box Culvert on Sadur char camunity school- Colghat Bazar Road at CH-557.0mConstruction of (1.50m X 1.50m) no Sadur char camunity school- Colghat Bazar Road at CH-756.0m Construction of 3 no (0.75m x 0.75m) RCC U Drain no Sadur char camunity school- Colghat Bazar Road at CH- 338.0m, 806.0m, & 964.0m 1.0000 98.737 M/S Shanto Enterprise, Holding No.309, Ukilpara, Bhola 98.737 11/02/2018 10/11/2018 100 31/12/2018 final Bill Payment
53 SA/R-123 Improvement of Charfession RHD-Purbo Ruhita RNGPS at CH- 00-1550.0m (Road ID- 509184079) (Length- 1550.0m) Construction of Charfession RHD-Purbo Ruhita RNGPS at CH- (Length- 301.0m) Construction of (1.50m x 1.50m ) RCC Box Culvert on Charfession RHD-Purbo Ruhita RNGPS at CH-315.0m & 1100.0m Construction of 4 no (0.75m x 0.75m) RCC U Drain no Charfession RHD-Purbo Ruhita RNGPS at CH-520m, 900, 1020m, 1240m 2.0000 124.234 M/S Shaki Enterprise, Koralia, Ward No.09, Bhola 124.234 11/02/2018 10/02/2019 100 31/12/2018 final Bill Payment
54 SA/M-162 Maintenance of Bhola-Ilisha RHD-Purba Ilisha up (NEW) Connection road at CH- 00-2000.00m Road ID- 509184065 (Effective Length – 2000.00m) 2.0000 41.366 M/S Shaha Alam, Muslim para, Bhola Sadar, Bhola 41.366 17/04/2018 08/10/2018 100 31/12/2018 BC Completed
55 SA/M-160 Maintenance of Maintenance of Madrasha hat - East Ilisha UP (East Berry Bandth) Road from Ch. 00-1475m (Length- 1475m) Road ID- 509183002 Under Sadar Upazila. Construction of Palisading Work on Madrasha hat - East Ilisha UP (East Berry Bandth) Road from Ch. (Effective Length – 388.00m) 1.0000 57.142 M/S Sayem Enterprise, Kalinath Rayer Bazar, Sadar, Bhola 57.142 10/04/2018 02/11/2018 60 31/12/2018 BC preperation on going
56 SA/R-139 Improvement of Majer Hat Bazer - Farid Member Bari at Ch. 00-1550.0m (Road ID-509185157) (Length-1550.0m) Construction of Palisading work on Majer Hat Bazer - Farid Member Bari at Ch. 00-1550.0m (Length-180.0m) Construction of 5 no (0.750 x 0.750 m) RCC U Drain on Majer Hat Bazer - Farid Member Bari at Ch.-110m, 230m, 320m, 390m, 506mConstruction of 2 no (1.50m x 1.50m) RCC Box Culvert on Majer Hat Bazer - Farid Member Bari at Ch.- 600m & 790m Construction of (3.00m x 3.00m) RCC Box Culvert on Majer Hat Bazer - Farid Member Bari at Ch.- 1400m 2.0000 135.477 M/S Sayem Enterprise, Kalinath Rayer Bazar, Bhola Sadar, Bhola. 135.477 31/01/2018 30/01/2019 100 31/12/2018 final Bill Payment
57 SA/R-48 Improvement of Sadur char Tematha-BholaKhaya ghat-Babul molla bridge at Ch 00-1830.00m Road ID 509184052 Construction of Palisading Work on Sadur char Tematha-BholaKhaya ghat-Babul molla bridge at Ch 162-178m (Total Length- 16.0m). 2.0000 74.669 M/S Sayem Enterprise, Kalinath Rayer Bazar, Bhola Sadar, Bhola. 74.669 16/10/2017 08/07/2018 100 31/12/2018 Final Bill Payment
58 SA/R-03 A. Improvement of Babul Molla Bridge-B.C k nogar Ch.00m-1250m. Road ID: 509184027 (BC Pavement). Construction of Palisading Work on Babul Molla Bridge-B.C k nogar at Ch.00m-20m B/S, 80-100m L/S, 130-150m R/S, 920-940m L/S, 1000-1015m Pond, 1060-1090m R/S, 1150-1170m L/S, 1210-1230m L/S . Road ID: 509184027 (Length- 165m). Construction of 3nos (0.75m x 0.75m) RCC Box Culvert on Babul Molla Bridge-B.C k nogar Ch.165.00m, 454.00m & 1000.00m. Road ID: 509184027 1.0000 82.803 M/S Sayem Enterprise, Kalinath Rayer Bazar, Bhola Sadar, Bhola 82.803 29/06/2017 21/03/2018 100 31/12/2018 Final Bill Payment
59 SA/M-159 Maintenance of Charnayabad Boddo Bari - Parem Road - chowkider Bari Mosques at Ch. 00-1440.0m (Length- 1440.0m) Road ID – 509185172 Under Sadar Upazila. Construction of Palisading Work on Charnayabad Boddo Bari - Parem Road - chowkider Bari Mosques at Ch. 00-1440.0m (Effective Length – 282.00m) Construction of (0.750m x0.750m) RCC Box Culvert on Charnayabad Boddo Bari - Parem Road - chowkider Bari Mosques at Ch. 1260.0m 1.0000 56.752 M/S Sayem Enterprise, Bhola Sadar Bhola. 56.752 10/04/2018 02/11/2018 100 31/12/2018 Final Bill Payment
60 SA/R-95 Improvement of Hetner Hat - Atol Howlader Bari Road at CH- 00-1240.0m (Length- 1240m. Road ID- 509185150) Construction of Palisading Work on Hetner Hat - Atol Howlader Bari Road at CH- 30-48m R/S, 91-105m R/S, 145-156 L/S, 290-298m L/S, 363-368 L/S, 1230-1240 L/S & R/S (Length- 94m) Construction of 2 no (0.75m x 0.75m) RCC Box Culvert on Hetner Hat - Atol Howlader Bari Road at CH- 43m & 458m Construction of 3 no (1.50m x 1.50m) RCC Box Culvert on Hetner Hat - Atol Howlader Bari Road at CH- 423m & 886m & 1024m 1.0000 90.042 M/S Sayem Enterprise, Bhola Sadar Bhola. 90.042 31/01/2018 30/01/2019 100 31/12/2018 Final Bill Payment
61 SA/M-24/1 1. Maintenance of Bhola kheya ghat-Kalinath bazar-Dorgar road-Bypass-Ponditer pool-Gozaria GC road at CH- 00-2000.00m Road (Length- 2000m) Road ID No- ID- 509182010 A. Pavment & Surfasing Work (Length- 2000m & Width -5.5m) B. Earth Work C. Protrective work (Length- 120.0m) D. RCC Pipe-Drain (Length- 800.0m 2.0000 269.410 M/S Santo Enterprise, Holding No-309, Ukilpara, Bhola. 269.410 25/01/2018 24/01/2019 90 31/12/2018 BC Completed
62 SA/M-168 Maintenance of Berry Bandh - Ponditer pole road at Ch- 00-1450.0m (Effective Length – 1450.00m) Road ID - 509185038 Palisading work at CH- 00-1442.0m (Effective Length – 319.00m) on the same Road. Construction of (1.50m x1.50m) RCC Box Culvert at Ch- 1087.0m & 1 no (0.750m x0.750m) RCC Box Culvert at Ch.- 90.0m & 1415.0m on the same Road. 1.0000 65.997 M/S Saleah Enterprise, Word No-06, Enayetullah Sarak Kasai Bari Pool, Borishal 65.997 17/04/2018 08/10/2018 60 31/12/2018 Hard bed preperation on going
63 SA/M-27 Maintenance of Puran Gogirghol – by pass road – Puran kathali – Nazi Bepari shop Road under Alinagar UP at CH- 00-2600.00m (Length- 2600.00m) Road ID- 509184025 Construction of Palisading work on Puran Gogirghol – by pass road – Puran kathali – Nazi Bepari shop Road under Alinagar UP at CH- 445-489 RS, 550-572M RS, 735-750 RS, 837-854 RS, 949-968 LS, 2050-2050-2085 LS. (177.0M) Construction of 3 no RCC Cross Drain on Puran Gogirghol – by pass road – Puran kathali – Nazi Bepari shop Road under Alinagar UP at CH- 700m, 1000m, & 1208m Construction of 2 vent 3.0x3.0m RCC Box Culvert on Puran Gogirghol – by pass road – Puran kathali – Nazi Bepari shop Road under Alinagar UP at CH- 00m. 3.0000 99.739 M/S Ruhul Amin, Amin Villa, Muslim Para, Bhola Sadar Bhola 99.739 01/11/2017 24/07/2018 100 31/12/2018 Final Bill Payment
64 SA/R-43 Improvement of Uttar Beduria High school Jungiala khayghat Road at Ch- 00-600.00m (BC Pavement Length - 600m). Road ID- 509185016Construction of Palisading Work on Uttar Beduria High school Jungiala khayghat Road at Ch-124-132m, LS, 182-210m RS, 224-248m RS, 290-315m RS, 333-340m RS, 432-442m LS (Length- 102m). Construction of (0.75x0.75m) RCC Cross Drain on Uttar Beduria High school Jungiala khayghat Road at Ch- 124m 1.0000 45.538 M/S Rubel Enterprise, Vaduria, Bhola Sadar. 45.538 05/10/2017 27/03/2018 100 31/12/2018 Final Bill Payment
65 SA/R-46 Improvement of PIlot Sadek Howlader Bari Mill - Sunder khali Pacca Road. at Ch.-00-1100.00m (BC Pavement Length - 1615m). Road ID- 509185161 Construction of Palisading Work on PIlot Sadek Howlader Bari Mill - Sunder khali Pacca Road. at Ch.- 00-25m RS, 65-107m LS, 160-190m RS, 262-305m LS, 328-393m LS, 530-550m LS, 600-620m RS, 640-660m RS, 668-712m LS, 718-758m RS, 760-770m RS, 930-963m RS, 987-1030m LS (Total Length- 445.0m). Construction of 2 no (1.50mx1.50m) RCC Box Culvert on PIlot Sadek Howlader Bari Mill - Sunder khali Pacca Road. at Ch.- 116.0m & 440.0m Construction of 2 no (0.75mx0.75) RCC Box Culvert on PIlot Sadek Howlader Bari Mill - Sunder khali Pacca Road. at Ch.- 700.0m & 895.0m 2.0000 88.507 M/S Rubel Enterprise, Vaduria, Bhola Sadar. 88.507 16/10/2017 08/07/2018 70 31/12/2018 WBM On completed
66 SA/M-02 A. Maintenance of Wapda (BIP-2)-Ratanpur Bazar-Charpata UP –RHD Ch- 2000m-3610m. B. Construction of Palisading Work on Wapda (BIP-2)-Ratanpur Bazar-Charpata UP –RHD at Ch- 3000-3045m R/S, 3400-3440m R/S, 3540-3590m R/S. (Length 135m). Road ID 509183005 2.0000 80.189 M/S Priyonti Construction, Holding No-1409, Gazipur road, Bhola. 80.189 15/06/2017 07/03/2018 100 31/12/2018 Final Bill Payment
67 SA/M-24/2 1. Maintenance of Bhola kheya ghat-Kalinath bazar-Dorgar road-Bypass-Ponditer pool-Gozaria GC road at CH- 2000-4030.00m Road (Length- 2030m) Road ID No- ID- 509182010 A. Pavment & Surfasing Work (Length- 2030m & Width -5.5m) B. Earth Work C. Protrective work (Length- 63.0m) D. RCC Pipe-Drain (Length- 1125.0m) 2.0000 310.767 M/S Priyonti Construction 310.767 25/01/2018 24/01/2019 90 31/12/2018 BC Completed
68 SA/R-45 Improvement of Humawan Mia Brick Field – Hossen Ali khan Bari – Harun member Bari Road. at Ch. 00-1500m under Bapta UP at CH- 00-1615.00m (BC Pavement Length - 1615m). Road ID- 509185160 Construction of Palisading Work on Humawan Mia Brick Field – Hossen Ali khan Bari – Harun member Bari Road. at Ch.-. 12-55m RS, 110-125m RS, 145-163m RS, 163-197m LS, 213-227m LS, 275-300m LS, 426-503m LS, 521-662m RS, 778-816m RS, 850-860m RS, 880-930m LS, 1090-1105m LS, 1220-1240m LS, 1250-1280m RS, 1420-1460m LS, 570-1600m RS (Length- 600m). Construction of (1.50mx1.50m) RCC Box Culvert on Humawan Mia Brick Field – Hossen Ali khan Bari – Harun member Bari Road. at Ch.- 822.00mConstruction of 2 vent (4.0mx4.0m) RCC Box Culvert on Humawan Mia Brick Field – Hossen Ali khan Bari – Harun member Bari Road. at Ch.- 195.00m Construction of 2 no (0.75mx0.75m) RCC Box Culvert on Humawan Mia Brick Field – Hossen Ali khan Bari – Harun member Bari Road. at Ch.- 1122.0m & 1338.0m 2.0000 156.866 M/S Prins Enterprsie, Bhola Sadar, Bhola 156.866 16/10/2017 08/10/2018 100 31/12/2018 Final Bill Payment
69 SA/R-30 Improvement of Rajapur Closer Berry Badh- (New UP Porished)--Roder hat Connecting Road at Ch. 526-2300m (BC Pavement Length -1774m). Road ID-509184077 Construction of Palisading Work on Rajapur Closer Berry Badh- (New UP Porished)--Roder hat Connecting Road at Ch. 550-570m L/S, 580-600m L/S, 605-625m R/S, 634-644m Rs, 692-720m Rs, 750-762m RS, 920-928m RS, 934-990m LS (Length- 174.0m). Construction of nos (0.750m x 0.750) RCC Cross Drain on of Rajapur Closer Berry Badh- (New UP Porished)--Roder hat Connecting Road. at CH- 788m, 2050m, 1855m, 2245m. 2.0000 113.860 M/S Orni Enterprise, Bhola Sadar, Bhola 113.860 10/07/2017 01/07/2018 100 31/12/2018 Carpeting Completed
70 SA/M-161 Maintenance of Bhola Barisal RHD Fajapur Tutatali bazar road at Ch. 00-1000.00m Road ID – 509185073 Under Sadar Upazila. Construction of Palisading Work on Bhola Barisal RHD Fajapur Tutatali bazar road at Ch. 00-1000.00m (Effective Length – 45.00m) Construction of 2 no (0.750m x0.750m) RCC Box Culvert on Bhola Barisal RHD Fajapur Tutatali bazar road at Ch. 35.0m & 890.0m 1.0000 33.345 M/S Orni Enterprise, Bhola sada, Bhola. 33.345 15/04/2018 04/10/2018 100 31/12/2018 Carpeting Completed
71 SA/R-02 A. Improvement of RHD -Taltoli Bazar- Ponditer Pool Road. at Ch.1625m-3615m .& 2765m-3615m Road ID: 509184011 (BC Pavement). B. Construction of Palisading Work on RHD -Taltoli Bazar- Ponditer Pool Road. at Ch.1670-1719m R/S, 1740-1755m L/S, 2200-2230m L/S, 2390-2420m L/S. Road ID: 509184011 (Length -124m). 2.0000 88.860 House No. 187/7, Lake Circus, Bashir Uddin road, Kalabagan, Dhaka-1205, Bangladesh. 88.860 28/06/2017 20/03/2018 100 31/12/2018 Final Bill Payment
72 SA/M-04 A. Maintenance of Bhola -charfession RHD Bangla Bazer-Dakshin Dighaldi UP via Santir Ch-2280m-2586m & 2720m-5870m. Road. B. Construction of Palisading Work on Bhola -charfession RHD Bangla Bazer-Dakshin Dighaldi UP via Santir at Ch-2375-2390m R/S, 2760-2780m R/S, 2808-2828m L/S, 2847-2872m L/S, 2908-2960m L/S, 3157-3187m L/S, 3250-3270m L/S, 3550-3570m L/S, 3630-3675m B/S, 3960-3990m L/S, 4060-4080m R/S, 4140-4155m R/S, 4515-4535m R/S, 4490-4420m R/S, 4550-5180m L/S, 5640-5655m R/S, 5710-5725m R/S, 5730-5745m R/S. (Length 427m). C. Construction of 2 no’s (0.750m x 0.750m) RCC Box Culvert at CH- 3430.00m, 5210.00m & 1 no’s (1.50m x 1.50m) ) (With-5.50m) RCC Box Culvert at CH- 4270.00m on Bhola -charfession RHD Bangla Bazer-Dakshin Dighaldi UP via Santir hat &. Road ID 509183015. 3.0000 132.302 M/S Nabarun Traders 132.302 15/06/2017 07/06/2018 100 31/12/2018 Final Bill Payment
73 SA/M-01 A. Maintenance of Dakshin Dighaldi UP (Joynogor high school)-Natun hat Berir hat-Gazaria GC Ch.00m-3300m. B. Construction of Palisading Work on Dakshin Dighaldi UP (Joynogor high school)-Natun hat Berir hat-Gazaria GC at Ch.350m-380m R/S Pond, 860-890m L/S Pond, 1530-1550m L/S Pond, 1586-1645m L/S Pond, 1930-1970m B/S Pond, 2840-2860m L/S Pond. C. Construction of 2 no’s (0.750m x 0.750m) RCC Box Culvert on Dakshin Dighaldi UP (Joynogor high school)-Natun hat Berir hat-Gazaria GC Road at Ch.1344.00m & 2200.00m . Road ID 509183014. 3.0000 107.496 M/S Md. Jakir Hossain, Masuma Khanom Rod, Bhola 107.496 25/06/2017 17/06/2018 100 31/12/2018 Final Bill Payment
74 SA/R-99 Improvement of Barister Kachari-Purbo Berry Bandh road at CH- 00-1330m (Length- 1330m. Road ID- 509185177) Construction of Palisading Work on Barister Kachari-Purbo Berry Bandh road. at CH- 40-100m R/S, 250-270m R/S, 310-410m R/S, 840-920m R/S, 1100-1190m R/S, 1250-1300 R/S (Length- 400m) Construction of 5 no (0.75m x 0.75m) RCC Box Culvert on Barister Kachari-Purbo Berry Bandh road .at CH- 104m, 335m, 660m, 1030m & 1210m Construction of (2x4.00x4.00) RCC Box Culvert on Barister Kachari-Purbo Berry Bandh road at CH- 812m 1.0000 126.724 M/S Mahir & Munem Business International, Ukilpara, Bhola Sadar Bhola. 126.724 15/02/2018 14/02/2019 50 31/12/2018 structure and palasiding on going
75 SA/R-29 Improvement of Dokkhin digoldy bagmara road-Harun Bepari bari road at Ch.00-600.0m (BC Pavement Length -600m). Road ID-509185210 Construction of Palisading Work on Dokkhin digoldy bagmara road-Harun Bepari bari road at Ch. 9-39m B/S, 99-116m L/S, 160-185m L/S, 215-246m R/S, 438-538m R/S (Length- 203.0m). Road ID-509185210 Construction of 3 nos (0.750m x 0.750m) RCC Box Culvert on of Dokkhin digoldy bagmara road-Harun Bepari bari road. at CH- 250m, 306m & 438m Construction of (1.50m x 1.50m) RCC Box Culvert on of Dokkhin digoldy bagmara road-Harun Bepari bari road at CH- 510m. . 1.0000 48.854 M/S Maa Enterprise, Bhola Sadar, Bhola. 48.854 05/10/2017 27/03/2018 100 31/12/2018 Final Bill Payment
76 SA/R-207 Improvement of CC Road at Charsaymia Charcifoly Ibrahim Charashi Bari at CH- 870-1000.0m Road ID - 509185232 5.769 M/S Julfikar Ahmed, Muslimpara, Bhola 5.769 19/07/2019 0 31/12/2018  
77 SA/R-206 Improvement of Agar pole-Muslime para Aukande Bari (Site Wading) Ch. 00-400m under Bapta UP Road ID 509185092 33.339 M/S Julfikar Ahmed, Muslimpara, Bhola 33.339 19/07/2019 0 31/12/2018  
78 SA/M-03 A. Maintenance of Wapda (BIP-2)-Ratanpur Bazar-Charpata UP–RHD CH - 00m-2000m. B. Construction of Palisading Work on Wapda (BIP-2)-Ratanpur Bazar-Charpata UP–RHD at CH - 1100m-1116m L/S, 1300-1360m L/S, 1900-1936m L/S. (Length 112m). Road ID 509183005. 2.0000 91.633 M/S Jahanara Trading Corp. Word No. 9 Poura Char Jangal, Vocational road Bhola 91.633 15/06/2017 07/03/2018 100 31/12/2018 Final Bill Payment
79 SA/M-167 Maintenance of Dhania Chaklader Bari – Ali Hossen Minister Bari – Cyclone shelter road via Moazem house Road. at Ch- 00-1400.00m (Effective Length – 1440.00m) Road ID - 509185072 Palisading Work at CH- 55m-738.0m (Effective Length – 142.00m) on the same road. Construction of (0.750m x0.750m) RCC Box Culvert at Ch.- 930.0m on the same Road. 1.0000 49.613 M/S Jahanara Trading Corp, Word No-9 Poura Jangla Vocational Road Bhola 49.613 17/04/2018 08/10/2018 100 31/12/2018 Final Bill Payment
80 SA/STR-126 Construction of (2.0m x 4.0m x 4.0m) RCC Box Culvert on on Ismail Forazi bari road under Bapta UP Road at CH- 5.00m ( Road ID – 509184143) 24.791 M/S Jahanara Trading Corp, Word no.9 Poura Char Jangla, Vocational Road, Bhola 24.791 11/02/2018 10/08/2018 100 31/12/2018 Final Bill Payment
81 SA/M-07 A. Maintenance of Bangla Bazer – Bagmara - Baroni kachare-Shainter hat road at Ch.00m-1930.00m Road ID 509185087 (BC Pavement Length 1930m) B. Construction of Palisading Work on Bangla Bazer – Bagmara - Baroni kachare-Shainter hat road at Ch.-25-75m R/S (Pond), 150-180m R/S (Pond), 320-345m L/S (Pond), 370-380m R/S (Pond), 730-780m L/S (Pond), 1100-1115m R/S (Pond), 1170-1200m R/S (Pond). Road ID 509185087 (Length- 210m). 2.0000 68.347 M/S Hayder Builders, Bhola Sadar, Bhola 68.347 12/07/2017 04/04/2018 100 31/12/2018 Final Bill Payment
82 SA/R-47 Improvement of Alinagar Madrashsa Bazar Mazi Bari - Gazaria GC Road. at Ch- 00-1380.00m Road ID 509185141Construction of Palisading Work on Alinagar Madrashsa Bazar Mazi Bari - Gazaria GC Road. Ch- 66-90m LS, 355-394m LS, 432-455m RS, 584-617m RS, 650-670m RS, 690-713m LS, 855-870m LS, 931-965m RS, 1014-1025m LS, 1188-1208m RS, 1340-1375m LS. (Total Length- 312.0m). Construction of 3 no (1.50mx1.50m) RCC Box Culvert on Alinagar Madrashsa Bazar Mazi Bari - Gazaria GC Road. at Ch- 80m , 870m, & 1222m 1.0000 110.255 M/S Hawladar Construction, Borhanuddin, Bhola 110.255 16/10/2017 08/10/2018 100 31/12/2018 final Bill Payment
83 SA/R-42 Improvement of Bhola Coast Guard office - Nazim Chowkider Bari Road. at CH- 00-950.00m (BC Pavement Length - 950m). Road ID- 509185165 Construction of Palisading Work on Bhola Coast Guard office - Nazim Chowkider Bari Road. at CH- 25-58m RS, 107-125m LS, 225-238m LS, 250-273m LS, 410-416m LS, 770-795m LS (Length- 118m). 1.0000 65.700 M/S Hawladar Construction, Borhanuddin, Bhola 65.700 05/10/2017 27/06/2018 100 31/12/2018 Final Bill Payment
84 SA/R-120 Improvement of Hatner hat-Arujan ali khayghat road at CH- 00-2060.0m (Road ID- 509184036) (Length- 2060.0m) Construction of Palisading Work on Hatner hat-Arujan ali khayghat road at CH- (Length- 359.0m) Construction of 4 no (0.75m X 0.75m) RCC Box Culvert on Hatner hat-Arujan ali khayghat road at CH- 516m, 660m, 990m, & 1080m Construction of (1.50m X 1.50m) no Hatner hat-Arujan ali khayghat road at CH- 480.0m Construction of (3.0m X 3.0m) no Hatner hat-Arujan ali khayghat road at CH- 1262.0m 2.0000 159.531 M/S Eli Enterprise, Sadar Road, Bhola 159.531 23/02/2018 14/10/2019 40 31/12/2018 structure and palasiding on going
85 SA/M-09 A. Maintenance of Velumia Bazar (UPC) - Sharif Khan Bazar – Bauphal Lunch Ghat Road. Ch. 4170-5620.0m. Road ID- 509183008. (BC Pavement Length 1450m) .B. Construction of Palisading Work on Velumia Bazar (UPC) - Sharif Khan Bazar – Bauphal Lunch Ghat Road. Ch- 4308-4324m L/S, 4347-4360m L/S, 4470-4495m L/S,4526-4540m L/S, 4550-4563m L/S, 4573-4594m L/S, 4776-4837m R/S, 4853-4922m L/S, 4991-5005m R/S, 5065-5087m L/S, 5355-5363m L/S, 5572-5608m R/S. Road ID- 509183008. (Length- 312m). 1.0000 97.381 M/S Alif Enterprise 97.381 10/07/2017 02/04/2018 100 31/12/2018 Final Bill Payment
86 SA/R-04 A. Improvement of RHD - Bagmara – Madhe Bari-Sorif bari - Balia high school Khorshed Alom Master Bari. Ch.00m- 1030m Road ID-509185104 (BC Pavement). B. Construction of Palisading Work on RHD - Bagmara – Madhe Bari-Sorif bari - Balia high school Khorshed Alom Master Bari. at Ch.10m- 60m R/S, 100-120m L/S, 400-420m R/S, 500-540m L/S, 600-640m B/S Road ID-509185104 (Length- 170m). C. Construction of 2 nos (1.50m x 1.50m) (With-5.50m) RCC Box Culvert on RHD - Bagmara – Madhe Bari-Sorif bari - Balia high school Khorshed Alom Master Bari.Ch. 800.00m & 998.00m. Road ID-509185104 1.0000 77.724 M/S Akter Hossain, Bhola Sadar, Bhola. 77.724 26/06/2017 13/03/2018 100 31/12/2018 Final Bill Payment
2 Borhanuddin
1 BOR/R-236 Improvement of Tobgi Fakir Bari to Nafu Mia Bari RHD raod at CH- 00-1398.0m Road ID 509214070 Construction of 5 no (0.625x0.625m) RCC Box Culvert on the same Road at CH- 472m/647m/1094m/1284m/1336m 1.4000 96.143 Md. Ruhul Amin, Amin Villa, Muslimpara, Bhola Sadar, Bhola 96.143 0 31/12/2018  
2 BOR/R-235 Improvement of Kali Mondir road to East side Piyari Mohan Hawladerbari clinic East side to Sagla road at CH- 00-1039.0m Road ID 509215180 Palisading Work (Effective Length- 303.0m)on the same Road Construction of 3 no (0.750x0.750m) RCC Box Culvert on the same Road at CH- 49m/467m/567m Construction of (3.0mx2.0m) RCC Box Culvert on the same Road at 397.0m 1.0300 93.445 M/S Md. Javed, Pawro Khatli, Bhola 93.445 0 31/12/2018  
3 BOR/R-234 Improvement of Kutuba UP Office-Baklaibari RHD road at CH- 1300-1910.0m Road ID 509213009 Palisading Work (Effective Length- 160.0m)on the same Road Construction of 2 no (0.625x0.625m) RCC Box Culvert on the same Road at CH- 1825m/1889m 0.6100 48.040 M/S. Shaki Enterprise, Koralia, Ward No-09, Bhola Sadar, Bhola 48.040 0 31/12/2018  
4 BOR/R-233 Improvement of Entukaribari-Shantir hat road at CH- 00-238m Road ID 509215168 Palisading Work (Effective Length- 78.0m)on the same Road Repair of RCC Box Culvert on the same Road 0.2400 18.854 M/S Md. Jamal Uddin Golder, Sadar Road, Bhola 18.854 0 31/12/2018  
5 BOR/R-232 Improvement of GeduGazibari-Gosso gram bridge road at CH- 00-782.0m Road ID 509215167 Palisading Work (Effective Length- 348.0m)on the same Road Construction of 3 no (0.750x0.750m) RCC Box Culvert on the same Road at CH- 496m/543m/634m Construction of (2.0mx2.0m) RCC Box Culvert on the same Road at CH- 732.0m 0.7900 78.476 M/S Apu Enterprise, Narkathi, Barisal Sadar, Barisal 78.476 0 31/12/2018  
6 BOR/R-231 Improvement of South Jaya road to Khayer hat Borhanuddin RHD road at CH- 00-1000.0m Road ID 509215035 Palisading Work (Effective Length- 186.0m)on the same Road Construction of 7 no (0.750x0.750m) RCC Box Culvert on the same Road at CH- 12m/96m/145m/227m/403m/527m/707m Construction of (2.0mx2.0m) RCC Box Culvert on the same Road at CH- 919.0m 1.0000 113.508 Golam Mowla Liton, S/O Sultan Ahmed, Kalibari Road, Bhola Sadar, Bhola 113.508 0 31/12/2018  
7 BOR/R-230 Improvement of Helipad to Gongapur road via AfajuddinSarkerbari to Kutuba UP road at CH- 00-520.0m, Road ID 509215181 Palisading Work (Effective Length- 186.0m)on the same Road Construction of 2 no (0.625x0.625m) RCC Box Culvert on the same Road at CH- 127m/281m 0.5200 43.654 Golam Mowla Liton, S/O Sultan Ahmed, Kalibari Road, Bhola Sadar, Bhola 43.654 0 31/12/2018  
8 BOR/R-229 Improvement of Munshir Hat- Lion Cottage RHD road at CH- 00-1250.0m Raod ID - 509214043 Palisading Work (Effective Length- 347.0m)on the same Road Construction of (1.0x1.0m) RCC Box Culvert on the same Road at CH- 948.0m 1.2500 97.833 M/S Priyonti Construction, Holding No-1409, Gazipur Road, Bhola 97.833 0 31/12/2018  
9 BOR/R-216 Improvement of Baisagobari-NasuMattabbar house road at CH – 00-1460.0m (Effective Length- 1460.0m)509215170 Palisading Work (Effective Length- 378.0m)on the same Road Construction of 5 no (0.625x0.625m) RCC Box Culvert on the same Road at CH- 375m/649m/905m/810m/12310m 1.4600 135.530 M/S Sayem Enterprise,Kalinath Rayer Bazar, Bhola Sadar, Bhola 135.530 0 31/12/2018  
10 BOR/R-215 Improvement of MohilaMadrasha-East side to Katakhali Bridge road at CH- 00-1142.0m (Effective Length- 1142.0m) Road ID- 509215166 Palisading Work (Effective Length- 367.0m)on the same Road Construction of 3 no (0.625x0.625m) RCC Box Culvert on the same Road at CH- 333.0m, 426.0m & 947.0m 1.1500 92.740 M/S Sayem Enterprise,Kalinath Rayer Bazar, Bhola Sadar, Bhola 92.740 0 31/12/2018  
11 BOR/R-214 Improvement of RHD East Kachia GPS to Red rose GPS Road at CH- 670-1935m (Effective Length- 1935.0m) Road ID- 509215047 Palisading Work (Effective Length- 242.0m) on the same Road Construction of 2 no (1.0x1.0m) RCC Box Culvert on the same Road at CH- 735.0m & 1811.0m 1.9400 97.482 M/S Priyonti Construction, Holding No-1409, Gazipur Road, Bhola 97.482 0 31/12/2018  
12 BOR/R-202 Improvement of Borhanuddin Mridha bari North side pacca-South side khal road at CH- 00-1790.0m (Effective Length- 1790.0m) Road ID: 509215054 Palisading Work (Effective Length- 250.0m) on the same Road Construction of 4 no (1.0x1.0m) RCC Box Culvert on the same Road at CH- 397m, 496m, 1112m & 1667m 1.7900 140.908 M/S Howladar Construction Borhanuddin, Bhola 140.908 03/07/2018 26/06/2019 30 31/12/2018 STR on going
13 BOR/R-198 Improvement of RHD Boyajuddin Howlader Bari to Arob ali Hawlader Bari at CH- 00-623.0m (Effective Length- 623.0m) Road ID-509215107 0.6200 34.912 M/S Shahabuddin Bhola Sadar, Bhola 34.912 05/07/2018 25/06/2019 0 31/12/2018  
14 BOR/R-197 Improvement of Manikar hat-Kahayer hat GC road at CH- 00-2877.0m (Effective Length- 2877.0m) Road ID- 509214061 2.8800 57.467 M/S Roni Construction Borhanuddin, Powrashava Bhola 57.467 05/07/2018 27/06/2019 0 31/12/2018  
15 BOR/R-196 Improvement of Khayer hat south side to fish ghat road at CH- 00-832.0m (Effective Length- 832.0m) Road ID- 509215164 Palisading work (Effective Length- 333.0m) on the same road. 0.8300 63.926 H.L Corporation H/N 1156Vill Western Para, post Bhola Powrashava Bhola 63.926 05/07/2018 27/06/2019 0 31/12/2018  
16 BOR/R-195 Improvement of Boromanika Farazi bari-Kowmi Madrasha vai Moulla Bari road at CH- 00-1566.0m (Effective Length- 1566.0m) Road ID- 509215119 1.0000 49.991 M/S Kaikobad,2 no Powroword, Kutba, Borhanuddin, Bhola 49.991 05/07/2018 27/06/2019 0 31/12/2018  
17 BOR/R-194 Improvement of Karamotgonj RHD to Ranigonj road at CH- 00-1000.00m (Effective Length- 1000.0m) Road ID- 509214057 1.0000 56.179 M/S Sharmin Enterprise Pokhia Borhanuddin Bhola 56.179 05/07/2018 27/06/2019 0 31/12/2018  
18 BOR/R-193 Improvement of Moulavir hat-East side to Abdul Hasem Farazi house road at CH- 00-600.0m (Effective Length- 600.0m) Road ID- 509215165 Palisading Work (Effective Length- 600.0m) on the same Road Construction of (1.0x1.0m) RCC Box Culvert on the same Road at CH- 377.0m Construction of 4 no (0.6250m x 0.625m) RCC Box Culvert on the same Road at CH- 377.0m 0.6000 54.185 M/S Roni Construction Borhanuddin, Powrashava Bhola 54.185 03/07/2018 25/06/2019 70 31/12/2018 WBM on going
19 BOR/R-183 Improvement of Bhola to Charfassion CMB road Chowdhury para Via Betua Khal at CH-00-1436.00 m (Effective Length 1436.00 m) ID No. 509215189 Palisading Work (Effective Length 354.00 m) on the same road. Construction of 2 no RCC Box Culvert at Ch 206.00 m, 765.00m on the same road.. 1.4400 111.103 M/S Bikrompur Enterprise Muslimpara Bhola 111.103 03/07/2018 25/06/2019 0 31/12/2018  
20 BOR/R-182 Improvement of RHD Lal Dighi-CO road at CH-00-1694.00 m (Effective Length 1694.00 m) ID No. 509214027. Palisading Work (Effective Length 142.00 m) on the same road. Construction of 6 no RCC Box Culvert at Ch 85.00 m, 113.00m, 594.00m,761.00m, 885.00m, 986.00m on the same road. 1.6900 84.286 M/S Khan & sons Thana road Borhanuddin, Bhola 84.286 26/07/2018 18/07/2019 40 31/12/2018 sub base on going
21 BOR/R-181 Improvement of Char Titia to Talpater Hat via Komoruddin Houlader road at CH-00-1135.00 m (Effective Length 1135.00 m) ID No. 509214041. Palisading Work (Effective Length 243.00 m) on the same road. Construction of 3 no RCC Box Culvert at Ch 185.00 m, 409.00m, 965.00m on the same road. 1.1400 84.860 Md. Rafiqul Islam Borhanuddin, Bhola 84.860 05/07/2018 27/06/2019 0 31/12/2018  
22 BOR/R-180 Improvement of Choto Manika GPS to South side to Gongapur border at CH-00-1180.00 m (Length 1180.00 m) ID No. 509215178. Palisading Work (Effective Effective Length 142.00 m) on the same road. Construction of 5 no RCC Box Culvert at Ch 338.00 m, 513.00m, 712.00m, 739.00m, 1146.00m on the same road. 1.1800 86.119 M/S Bikrompur Enterprise Muslimpara Bhola 86.119 26/07/2018 18/07/2019 0 31/12/2018  
23 BOR/R-179 Improvement of Kunjerhat GCR road Akbor lat shop- Abdul karim Munshir bari to Nur Alam hawlader dokan via North side Kalu Hawlader Bari to Musalman pukur Cyclone shelter at CH-00-1127.00 m (Effective Length 1127.00 m) ID No. 509215184. Palisading Work (Effective Length 88.00 m) on the same road. Construction of 3 no RCC Box Culvert at Ch 451.00 m, 939.00m, 1115.00m on the same road. 1.1300 77.119 M/S Shazi Traders Chack Dosh Kunjerhat Borhanuddin Bhola 77.119 01/07/2018 23/06/2019 0 31/12/2018  
24 BOR/R-178 Improvement of Bhola to Charfassion CMB road Kunjerhat North side of west side Kazi Bari road Via west side Bazlu Hawlader Bari at CH-00-1000.00 m (Effective Length 1000.00 m) ID No. 509215185. Palisading Work (Effective Length 222.00 m) on the same road. Construction of RCC Box Culvert at Ch 828.00 m on the same road. 1.0000 77.849 M/S Bhuya Enterprise 77.849 04/09/2018 26/08/2019 0 31/12/2018  
25 BOR/R-177 Improvement of CO road ful kachia Majunder bari Kunjer hat to Mozzam GCR Abbas Munshi Bari Road at CH-00-1340.00 m (Effective Length 1340.00 m) ID No. 509215187. Palisading Work (Effective Length 182.00 m) on the same road. Construction of 2 no RCC Box Culvert at Ch 700.00 m, 1178.00m on the same road. 1.3400 94.276 M/S Sharmin Enterprise Pokhia Borhanuddin Bhola. 94.276 26/07/2018 18/07/2019 0 31/12/2018  
26 BOR/R-176 Improvement of RHD Khayer Moulovi Mosque-Dakkhin side road at CH-00-687.00 m (Effective Length 687.00 m) ID No. 509215160 Palisading Work (Effective Length 55.46 m) on the same road. Construction of 5 no RCC Box Culvert at Ch 160.00m, 343.00m, 385.00m, 412.00m, and 485.00m on the same road.. 0.6900 58.925 M/S Khan & sons Thana road Borhanuddin Powrashava, Bhola 58.925 02/07/2018 29/06/2019 0 31/12/2018  
27 BOR/R-175 Improvement of RHD to Woaziullah Biswas bari road at CH-00-240.00 m (Effective Length 240.00 m) ID No. 509215194. Palisading Work at (Effective Length 65.00 m) on the same road. 2.4000 18.405 M/S Md. Kalikobad 18.405 04/09/2018 26/02/2019 0 31/12/2018  
28 BOR/R-243 (A) Improvement of CO road Chowmohani-North Kachia RPS Road at CH- 00-3679.00m Road ID 509214030 (B) Palisading Work (Effective Length- 568.0m) on the same Road(C) Construction of 8 no (1.0x1.0m) & 2 no (0.625x0.625m) RCC Box Culvert on the same Road at CH -808/985/1194/152/2007/2482/2798/3463m (D) Improvement of Imam uddin Mirdha Bari-Gov. Dighi road at CH- 00-1665.0m Road ID 509215172(E) Palisading Work (Effective Length- 618.0m) on the same Road(F) Construction of 6 no (0.75x0.75m) & 1 no (2x4.50x2.50m) & 1 no (2.00x2.00m) RCC Box Culvert on the same Road at CH -30/345/439/572/1155/1537/995/559m (Salvage Cost 91,186.00) 5.0000 466.739 M/S Priyonti Construction, Holding No-1409, Gazipur Road, Bhola 466.739 0 31/12/2018  
29 BOR/STR-203 Construction of 12m RCC bridge on Borhanuddin RHD-Sayed Bepari bari to Choto Manika Baro bari road. at CH- 15.00m Road ID 502914080 84.874 M/S Khan & Sons, Thana Road, Borhanuddin Powrashava, Bhola. 84.874 26/07/2018 18/07/2019 0 31/12/2018  
30 BOR/R-59 Improvement of ofRHD Krisnachura Tree-(Shohid Zia road to BorhangonjRanigonj road at Ch- 00-1340.0m (Length – 1340.0m) Road ID- 509214037 Construction of Palisading Work onRHD Krisnachura Tree-(Shohid Zia road to BorhangonjRanigonj road at Ch- 286-306m R/S, 297-606 LS, 335-345 LS, 362-390 RS, 490-517 LS 555-568 RS, 568-591 LS, 591-620 LS, 620-640 BS, 753-773 LS, 792-828 RS, 852-888 RS, 919-930 RS. (Length = 302.0m) 1.3400 48.440 M/S Hawlader Construction, Borhanuddin, Bhola 48.440 19/10/2017 11/04/2018 100 31/12/2018 Final Bill Payment
31 BOR/R-52 Improvement of Char GazipurHawladerbari to west Gazi Bari road at Ch- 00-1000.00m Length ( 1000m) Road ID- 509214080 Construction of Palisading Work onChar gazipurHawladerbari to west Gazi Bari road at Ch- 19-30, RS, 40-58, LS, 64-74, LS, 450-465 RS, 610-619 RS, 633-642 RS, 652-664-LS, 831-842 RS, 945-966 RS (Total Length = 116.5m) Construction of 2 no (0.625 x 0.600) (5.5m) RCC “U” Drain onGazipurHawladerbari to west Gazi Bari road at Ch- 114m & 468m 1.0000 65.182 M/S Hawlader Construction, Borhanuddin, Bhola 65.182 18/10/2017 10/07/2018 100 31/12/2018 BC Completed
32 BOR/R-51 Improvement of South Mirzakalu bazar-Katakhali bridge road at CH- 00-1000.00m Length ( 1000m) Construction of Palisading Work onSouth Mirzakalu bazar-Katakhali bridge road at CH- 23-35m, LS, 359-374 LS, 475-500 LS, 694-713 RS, 846-876 RS, 952-900 RS Road ID 509214074 1.0000 68.604 M/S Madina Enterprise, North Degoldi, Joynagar, Bhola 68.604 18/10/2017 10/07/2018 0 31/12/2018 Contruct Reject
33 BOR/R-200 Improvement of Boromanika Bashir Miar Dhighe to santerhat via Dargha hat at CH- 00-2392.0m (Effective Length- 2392.0m) Road ID: 509215108 2.3000 140.714 H.L Corporation H/N 1156Vill Western Para, post Bhola Powrashava Bhola 140.714 05/07/2018 25/06/2019 30 31/12/2018 STR on going
34 BOR/R-199 Improvement of Manika Hat-Noor Miar Hat Road at CH- 00-4670.0m (Effective Length- 4670.0m) Road ID: 509214060 4.6000 191.463 M/S Hauladar Construction 191.463 26/08/2019 0 31/12/2018  
35 BOR/R-156 Improvement of Sachra Pacca road to Rare bari road at CH- 00m-2050m (Effective Length- 2050.0m) Road ID: 509214083Construction of Palisading work on Sachra Pacca road to Rare bari road at CH- 00m-2050m (Effective Length – 456.0m) Construction of (0.625x0.625m) RCC U Drain on Sachra Pacca road to Rare bari road at CH- 1358.0mConstruction of (1.50m x 1.50m ) RCC Box Culvert on Sachra Pacca road to Rare bari road at CH- 1794.0m Construction of (1.00m x 1.00m ) RCC Box Culvert on Sachra Pacca road to Rare bari road at CH- 1662.0m 2.0500 139.787 M/S Mohammad Hanif, Bhola Sadar, Bhola 139.787 01/05/2018 22/04/2019 50 31/12/2018 WBM on going
36 BOR/R-107 Improvement of Gafurgong Bazar-Mollarhat Mosonerhat road at CH- 00m-875m (Length- 875.00m. Road ID- 509214075) Construction of Palisading work on Gafurgong Bazar-Mollarhat Mosonerhat road at CH – 433-458m, RS, 541-548M RS, 556-576M RS, 595-600M RS, 631-635M LS, 784-795M RS, 813-833M RS, 863-870M LS (Length – 99m) Construction of (0.625x0.625m) RCC U Drain on Gafurgong Bazar-Mollarhat Mosonerhat road at CH – 712.00m 0.8800 60.802 M/S Zakir Hossain, Bhola Sadar Bhola 60.802 100 31/12/2018 Final Bill Payment
37 BOR/M-201 Maintenance of RHD at Azad Nagar (Motiar mar pukur)-Alimuddin Via Bara Manika Up & Mollar Hat road at CH- 00-7120.0m (Effective Length- 7120.0m) Road ID: 509213008 7.1200 201.353 Md. Rafiqul Islam Borhanuddin, Bhola 201.353 28/06/2018 27/06/2019 0 31/12/2018  
38 BOR/M-15 Maintenance of Maintenance of Borhanuddin Upzila H/Q (Kutuba High School) Borhangonj GC south Kutuba Natun Bazar road at CH-00-6660.0m Road ID-509212012Construction of Palisading Work on Borhanuddin Upzila H/Q (Kutuba High School) Borhangonj GC south Kutuba Natun Bazar road at CH- 1100-1116m L/S 1157-1173m L/S, 1745-1766m L/S, 2255-2286m R/S, 2301-2330m L/S, 2598-2620m L/S, 2812-2833m L/S, 2860-2870m R/S, 3712-3725m L/S, 6101-6125m R/S, 6148-6160-R/S, 6164-6175m R/S, 6385-6423m R/S, 6572-6596m R/S. (Total Length – 288m ). Road ID- 509212012Construction of (2x3.0x3.0) (5.50m) RCC Box Culvert on Borhanuddin Upzila H/Q (Kutuba High School) Borhangonj GC south Kutuba Natun Bazar road at CH- 1246m. Road ID- 509212012Construction of U Drain (0.625x0.600) (5.50m) on Borhanuddin Upzila H/Q (Kutuba High School) Borhangonj GC south Kutuba Natun Bazar road at CH- 56896m. Road ID- 509212012 6.6600 158.289 Md. Rafiqul Islam, Khaier Hat Borhanuddin Bhola. 158.289 12/07/2017 06/09/2018 100 31/12/2018 BC Completed
39 BOR/M-14 Maintenance of Moazzem Hat-Dowri GC (Borhanuddin Part) at CH- 00-2723m (BC Pavement, Length 00– 2723m). Road ID- 509212013Construction of Palisading Work on Moazzem Hat-Dowri GC (Borhanuddin Part) at CH- 1035-1065m R/S (Total Length – 27m ). Road ID- 509212013Construction of (1m x 1m) (7.30m) RCC Box Culvert on Moazzem Hat-Dowri GC (Borhanuddin Part) at CH- 756.0m Road ID- 509212013Construction of 2 no U Drain (0.625x0.600) (7.30m) on Moazzem Hat-Dowri GC (Borhanuddin Part) at CH- 107m & 1995m. Road ID- 509212013 2.7200 110.432 M/S Shah Alam, Muslim Para Bhola Sadar Bhola. 110.432 12/07/2017 04/04/2018 60 31/12/2018 WBM Completed
40 BOR/M-13 A. Maintenance of Sikderhat-Kunjer Hat GC up to Boyder Bridge road at CH- 00-3405m (BC Pavement, Length – 3405 m ). Road ID- 509212011 B. Construction of Palisading Work on Sikderhat-Kunjer Hat GC up to Boyder Bridge road at CH- 3364-3374m L/S ( Total Length – 10m ). Road ID- 509212011 C. Construction of 3 no (1m x 1m) (4.66m) RCC Box Culvert on Sikderhat-Kunjer Hat GC up to Boyder Bridge road at CH- 70m , 3318m, 3400m. Road ID- 509212011 D. Construction of 6 no (0.625m x 0.600m ) (7.30m) RCC Box Culvert on Sikderhat-Kunjer Hat GC up to Boyder Bridge road at CH- 680m, 880m, 1670m, 2172m. Road ID- 509212011 3.4100 89.265 M/S S & N JV, 8200, Barishal Sadar Upazila Borishal. 89.265 07/12/2017 04/04/2018 100 31/12/2018 Final Bill Payment
41 BOR/M-12 Maintenance of Mirzakalu GC (Near Chowdhury Bari)- Fakir hat Dalal Bazar R & D Road at CH- 00-2111m & 6000-9755m (BC Pavement, Length – 5866m ). Road ID- 509212004 Construction of Palisading Work on Mirzakalu GC (Near Chowdhury Bari)- Fakir hat Dalal Bazar R & D Road at CH- 842-847m L/S, 854-859m R/S, 1172-1178m L/S1302-1318m R/S, 1500-1519m R/S, 1743-1753m L/S, 1772-1800m L/S. ( Total Length – 98m ). Road ID- 509212004 Construction of 5 no (1m x 1m) RCC Box Culvert on Mirzakalu GC (Near Chowdhury Bari)- Fakir hat Dalal Bazar R & D Road at CH- 790m , 1790m, 6458m, 6725m, 8470m. Road ID- 509212004 Construction of 6 no (0.625mx 0.600m) U Drain on Mirzakalu GC (Near Chowdhury Bari)- Fakir hat Dalal Bazar R & D Road at CH- 815m, 6275m, 6553m, 6624m, 7860m. Road ID- 509212004 5.8700 213.667 M/S Hawlader Construction.Borhanuddin,Bhola,Bhola 213.667 30/07/2018 30/07/2018 100 31/12/2018 BC Completed
42 BOR/R-50 Improvement of Sikderhar- Maniram RD Borhanuddin Lalmohan RHD Road at CH- 1230-2392.00m. Length ( 1162m) Road ID- 509214016hanudding Lalmohan RHD Road at CH- 1475m 1.1600 162.637 M/S Jarin & Co, Word No. 07 Ukilpara, Bhola. 162.637 0 31/12/2018  
43 BOR/M-238 Maintenance of Moazzam Hat (Deula Up)- Kacharir hat road from CH- 2000-3300m Road ID 509213011. Maintenance of Chargazipur-Chartitiya via Talukder hat road at CH- 2300-3130.0m Road ID 509214034 2.1300 85.209 M/S Hawladar Construction, Borhanuddin, Bhola. 85.209 0 31/12/2018  
44 BOR/R-141 Improvement of Deula Moulavi Bari to Hazi Md. Shahalam Chowkider Bari Via south Battala road at CH- 00-3257.0m Road ID 509214088 3.2600 211.356   211.356 0 31/12/2018  
45 BOR/R-240 (A) Improvement of Maniram-Munshir hat RHD- Azahar Chowdhury Bari Road at CH- 1000-2057.0m Including 6 no (0.75x0.75m) RCC Box Culvert, 1 no (2.0x2.0m) RCC Box Culvert & 154m RCC Palisading works on the same Road. Road ID 509214020 (B) Improvement of Deula Mongolar Dokan South Deula RPS road at CH- 00-1307.0m Including 83.0m RCC Palisading works on the same Road ID 50925123 2.3600 113.723   113.723 0 31/12/2018  
46 BOR/R-277 Improvement of Choto Manika Senior Madrasha road to South Mostafiz bari via South side of Jantu Kazi bari road at CH - 00-2392.00m Road ID 509215179 2.3900 129.461   129.461 0 31/12/2018  
47 BOR/R-276 Improvement of CO road Aziz Miar Bari-Uttor Kachia RPS Road at CH- 00-2008m Road ID 509215050 2.0100 140.597   140.597 0 31/12/2018  
48 BOR/R-275 (A) Improvement of Munshir-Lamukata road at CH- 00-2471.0m Including 259.0m RCC Palisading works on the same Road. Road ID - 509214008 (B) Improvement of Dargh-Maniram -Munshirhat Road at CH- 00-2143.0m Road ID 509214005 Salvage Cost =58,800.00 (C) I mprovement of - Serajul Patwary bari-Uttor side to Bazir hat Raod at CH- 00-957m Road ID 509215177 Salvage Cost =8,199.0 5.5700 197.934   197.934 0 31/12/2018  
49 BOR/R-280 (D) Improvement of Deula Up Moazzem Bazar-East Side to hazir Hat road at CH-00-2771.0m Road ID 509214087(E) Palisading Work (Effective Length- 195.0m) on the same Road(F) Construction of 3 no (1.00x1.00m) & 5 no (0.625x0.625m) RCC Box Culvert on the same Road at CH -788/2273/2393/956/1043/1641/2083/2663 2.7700 207.040   207.040 0 31/12/2018  
50 BOR/R-279 (A) Improvement of Sikderhat RHD-Kunjer Hat RHD raod at CH- 00-2000.00m Road ID 509214025(B) Palisading Work (Effective Length- 278.0m) on the same Road(C) Construction of 3 no (1.00x1.00m) & 4 no (0.625x0.625m) RCC Box Culvert on the same Road at CH -1346, 526,798,1791, . 2.0000 157.544   157.544 0 31/12/2018  
51 BOR/R-278 (G) Improvement of Fulkacia Kalir Hat south side of CO road via Mira bari field road at CH- 00-2140.0m Road ID 509215183 (H) Palisading Work (Effective Length- 173.0m) on the same Road(I) Construction of 3 no (0.625x0.625m) RCC Box Culvert on the same Road at CH -767/1676/1784 2.1400 144.645   144.645 0 31/12/2018  
52 BOR/R-244 (A) Improvement of Kachia Gas Field RD Tobgi Jamal Kandi road at CH- 00-1523.0m Road ID 509214017 (B) Palisading Work (Effective Length- 269.0m) on the same Road(C) Construction of 3 no (1.0x1.0m) & 2 no (0.625x0.625m) RCC Box Culvert on the same Road at CH -275/435/773/1022/1444m 1.5200 117.435   117.435 0 31/12/2018  
53 BOR/R-242 (A) Improvement of Bhola to Charfasshion CMB road Dalal Bazar North side to patawary bari Via Mohajon Bari Gas Field road at CH- 00-2342.0m Road ID 509215186(B) Palisading Work (Effective Length- 233.0m) on the same Road(C) Construction of 1 no (1.00x1.00m) & 3 no (0.625x0.625m) RCC Box Culvert on the same Road at CH -1346, 526,798,1791 2.3400 165.314   165.314 0 31/12/2018  
3 Charfassion
1 CHA/R-290 A. Improvement of Ahammadpur Union Akota Bazar - Ali Ahammad Munshir Bari via Abdur Rab Bapari Bari. Road From Ch. 00-650m under Charfassion Upazila, (509255087) B. Improvement of Nurabad Dc Road - Maya River (Ghat) via Rari Bari Mosjid Road From Ch. 1200-2200m under Charfassion Upazila, (509255034) C. Improvement of Uttar Char Manika Dakkin Beri Badh (Rahim Munshir Bari) -North way of Nasir Master Bazar.Road From Ch. 00-500m under Charfassion Upazila, (509254199) 2.1500 206.899   206.899 0 31/12/2018  
2 CHA/R-289 A. Improvement of Abdullahpur Sibarhat Bazar - South way of Surandip Khal. Road From Ch. 00-1000m under Charfassion Upazila, (509254198) B. Improvement of North Side of Janota Bazar (RHD) - East way of Kalapania Khal via Dafader Bari. Road From Ch. 00-500m under Charfassion Upazila, (509254195) C. Improvement of North Side of Nayeber Bridge (RHD) - East way of F. Rahaman Road From Ch. 00-500m under Charfassion Upazila, (509254194) 2.0000 214.985   214.985 0 31/12/2018  
3 CHA/R-288 A. Improvement of Abdullahpur UP Abdul Hasem Khan Jame Moszid - Mina Bazar.Road From Ch. 00-500m under Charfassion Upazila, (509254197) B. Improvement of Shashibhussion-Anjurhat road(Iqbal Patwary Dokan) to Bazlur Bazar Road From Ch. 800-2000m under Charfession Upazila, (509254183) C. Improvement of Ahammadpur Union South Side of Akota Bazar - Mahafujul HoqeMowlana Bari Road From Ch. 600-1280m under Charfassion Upazila, (509255088) 2.9800 222.464   222.464 0 31/12/2018  
4 CHA/R-287 A. Improvement of Rasulpur Dawan Bari Mosjid - West side More of Uttar Aicha Bazar (RHD Road). From Ch. 00-1000m under Charfession Upazila, (509254132) B. Improvement of RHD ( Miazir Khamar) - Baitul Gani Jame Moszid ( BC Road) via Ali Akbor Mazi Bari Moszid.Road From Ch. 1050-1550m under Charfession Upazila, (509254188) C. Improvement of North Aicha Bazar Embk. Via Golkhali khal From Ch. 1300-2755m under Charfession Upazila, (509254043) 2.9550 240.404   240.404 0 31/12/2018  
5 CHA/R-286 A. Improvement of Uttar Aicha RHD Road- Shashibussion Atkapat road via Zahira Madrasha Cum Cyclone Shelter.Road From Ch. 1000-1850m under Charfession Upazila, (509254125) B. Improvement of Anjur hat Maya Bridge ( Adu Mirdah Bari) - Langlapata 1No. Word Hafej howlader Bari via Bokshi Berry Bazar Jame Moszid.Road From Ch. 00-500m under Charfession Upazila, (509254193) 1.3500 125.316   125.316 0 31/12/2018  
6 CHA/R-285 Improvement of Kasemgonj Jalil Bapari Road (Kanchon Patowary Bari) - East way of Basir Bone Bazar (Embk)Road From Ch. 00-1735m under Charfession Upazila, (509255093) 1.7350 209.221   209.221 0 31/12/2018  
7 CHA/R-284 Improvement of Nurabad Madrasha-Katchia Khali Bazar Road From Ch. 2500-4700m under Charfession Upazila, (509254006) 2.2000 182.640   182.640 0 31/12/2018  
8 CHA/R-171 Improvement of Road From Betua RHD (Lounch Ghat) - Char Aicha GC Via Chairman Bazar Road at Ch- 8000-9300.0m (length-1300m) (Road ID- 509252007) 1.3000 76.075 Md. Jasim Construction, Thana Road, Charfassion, Bhola. 76.075 26/06/2018 25/06/2019 0 31/12/2018  
9 CHA/R-15 Improvement of Road From RHD Road (Hali pad) - West way of Kuchiamora Dr. Bari Bridge Road at Ch.00m-2432.0m Road ID: 509254018 (BC Pavement Length – 2432.0m). Construction of Palisading Work on RHD Road (Hali pad) - West way of Kuchiamora Dr. Bari Bridge Road at Ch. 00-100m L/S, 280-336m L/S, 460-535m L/S, 590-620m L/S, 631-676m L/S, 721-731m L/S, 941-970m L/S, 1092-1149m L/S, 1260-1286m L/S . Road ID: 509254018 (Length -428m). Construction of 1 no (2m X 4.50m X 3.50m) (w-4.260m) RCC Box Culvert on RHD Road (Hali pad) - West way of Kuchiamora Dr. Bari Bridge Road. at CH- 815.0m. Road ID: 509254018 Construction of 4 no (1.50m X 1.50m) (w-5.50m) RCC Box Culvert on RHD Road (Hali pad) - West way of Kuchiamora Dr. Bari Bridge Road. at CH- 21.0m, 333.0m, 1928.0m, & 2075.0m. Road ID: 509254018 Construction of 10 no (0.75m X 0.75m) (w-5.50m) RCC Box Culvert on RHD Road (Hali pad) - West way of Kuchiamora Dr. Bari Bridge Road. at CH- 167.0m, 515.0m, 655.0m, 1040.0m, 1156.0m, 1260.0m, 1482.0m, 2024.0m, 2220.0m, 2342.0m, & 2386.0m. Road ID: 509254018 2.4320 204.058 M/S Jasim Construction, Thana Road Charfashion, Bhola. 204.058 12/07/2017 07/04/2018 70 31/12/2018 WBM completed
10 CHA/R-144 Improvement of Samraj Done - West way of Madraj Done ( Zaman Road). Road at Ch- 00-1000.0m (length- 1000.0m) (Road ID – 509254202) Construction of (2 x 4.50m x 3.50m ) RCC Box Culvert on Samraj Done - West way of Madraj Done ( Zaman Road). Road at Ch- 600.00m 1.0000 78.994 M/S Khan Traders, Charfassion, Bhola 78.994 19/02/2018 10/11/2019 0 31/12/2018  
11 CHA/R-143 Improvement of Nurabad DC Road to Maya River Via Abdul Ali Chairman Bari Road at Ch- 00-1000.0m (length- 1000.0m) (Road ID – 509255035) Construction of Palisading Work on Nurabad DC Road to Maya River Via Abdul Ali Chairman Bari Road at Ch- 00-1000.0m (Length –222.0m) Construction of 5 no (1.50m x 1.50m ) RCC Box Culvert on Nurabad DC Road to Maya River Via Abdul Ali Chairman Bari Road at Ch- 250.0m, 348m, 460m, 708m, & 847.0m 1.0000 95.835 M/S Khan Traders Charfassion, Bhola 95.835 19/02/2018 10/11/2018 50 31/12/2018 WBM on going
12 CHA/R-142 Improvement of Anjur hat Road (Zor- Moszid) - Maya River Road. at Ch- 00-1000.0m (length- 1000.0m) (Road ID – 509255026) Construction of Palisading Work on Anjur hat Road (Zor- Moszid) - Maya River Road. at Ch- 00-1000.0m (Length –128.0m) Construction of 2 no (1.50m x 1.50m ) RCC Box Culvert on Anjur hat Road (Zor- Moszid) - Maya River Road. at Ch- 424.0m & 802.0m Construction of (0.75m x0.75m ) RCC U Drain on Anjur hat Road (Zor- Moszid) - Maya River Road. at Ch-115.0m 1.0000 79.194 Nabarun Traders Limited, House#187/7, Basiruddin Road, Kalabagan, Dhaka 79.194 19/02/2018 10/11/2018 70 31/12/2018 WBM completed
13 CHA/R-141 Improvement of Betua RHD Roadat Ch- 00-695.0m (length- 695.0m) (Road ID – 509254147) Construction of Palisading Work on Betua RHD Roadat Ch- 00-695.0m (Length – 60.0m) Construction of (3.0m x 3.0m ) RCC Box Culvert on Betua RHD Roadat Ch- 618.0m Construction of (1.50m x 1.50m ) RCC Box Culvert on Betua RHD Roadat Ch- 112.0m 0.6950 81.301 Nabarun Traders Limited, House#187/7, Basiruddin Road, Kalabagan, Dhaka 81.301 19/02/2018 10/11/2018 100 31/12/2018 BC Complete
14 CHA/R-14 Improvement of Charfession GC Betua road to Jinnagar U.HQ.via Chakbazar Road (Ch. 4000-4900m). ID: 509253052 (BC Pavement).Construction of Palisading Work on Charfession GC Betua road to Jinnagar U.HQ.via Chakbazar Road (Ch. 4670-4685m R/S). ID: 509253052 (Length 15m). Construction of 1no (1.5m x 1.5m) (w-5.5m) RCC Box Culvert on Charfession GC Betua road to Jinnagar U.HQ. via Chakbazar Road at Ch. 4630m. Road ID: 509253052. Construction of 3nos (0.75m x 0.75m) (w-5.5m) RCC Box Culvert on Charfession GC Betua road to Jinnagar U.HQ. via Chakbazar Road at Ch. 4157m, 4384m & 4475m. Road ID: 509253052. 0.9000 68.419 M/S Fakrul Islam, Ward No-01, Charfashion, Pourashava, Bhola. 68.419 04/07/2017 19/03/2018 100 31/12/2018 BC Complete
15 CHA/R-137 Improvement of Ahammedpur Union Hazirhat Bazar - North way of Akota Bazar Pucca Road (Nilkamol UP Border). at Ch- 00-1000.0m (length- 1000.0m) (Road ID – 509255086) Construction of Palisading Work on Ahammedpur Union Hazirhat Bazar - North way of Akota Bazar Pucca Road (Nilkamol UP Border). at Ch- 00-1000.0m (Length – 59.0m) Construction of 4 no (0.75m x 0.75m ) RCC U Drain on Ahammedpur Union Hazirhat Bazar - North way of Akota Bazar Pucca Road (Nilkamol UP Border). at Ch- 315, 500m, 590m & 850m 1.0000 74.476 M/S Khan Traders, Charfassion, Bhola 74.476 09/02/2018 11/10/2018 50 31/12/2018 WBM on going
16 CHA/R-136 Improvement of Char Manika Union Naya Miar Bari to Kalar Dhokan via Faruk Mamber Bari Road. at Ch- 00-845.0m (length- 845.0m) (Road ID – 509254217) Construction of Palisading Work on Char Manika Union Naya Miar Bari to Kalar Dhokan via Faruk Mamber Bari Road.at Ch-00-1000m (Length – 160.0m) Construction of 2 no (0.75m x 0.75m ) RCC U Drain on Char Manika Union Naya Miar Bari to Kalar Dhokan via Faruk Mamber Bari Road.at Ch- 585.0m & 669.0m 0.8450 64.240 M/S Khan Traders, Charfassion, Bhola 64.240 25/02/2018 19/02/2018 50 31/12/2018 WBM on going
17 CHA/R-135 Improvement of Bhuiyarhat Abugonj BC Road Gulam Maulana Sikder Bari - Sundari Khal Road at Ch- 00-1000.0m (length-1000.0m) (Road ID – 509255079) Construction of Palisading Work on Bhuiyarhat Abugonj BC Road Gulam Maulana Sikder Bari - Sundari Khal Road at Ch- 00-845m (Length – 22.0m) Construction of 2 no (0.75m x 0.75m ) RCC U Drain on Bhuiyarhat Abugonj BC Road Gulam Maulana Sikder Bari - Sundari Khal Road at Ch- 360m, 983m 1.0000 69.367 Md. Eunus Al Mamun, Thana Road, Charfassion, Bhola 69.367 11/02/2018 10/11/2018 50 31/12/2018 WBM on going
18 CHA/R-134 Improvement of Road From Charfassion Dularhat Road (Bat tala) -Surudip Khal Road. at Ch- 1000-2000m (length-1000.0m) (Road ID – 509254203) Construction of Palisading Work on Road From Charfassion Dularhat Road (Bat tala) -Surudip Khal Road. at Ch- Ch- 1000-2000m (Length – 182.0m) Construction of 5 no (0.75m x 0.75m ) RCC U Drain on Road From Charfassion Dularhat Road (Bat tala) -Surudip Khal Road. at Ch- 1235m 1400m, 1569m, 1807m, 1973m 1.0000 81.875 Nabarun Traders Limited, House#187/7, Basiruddin Road, Kalabagan, Dhaka 81.875 11/02/2018 10/11/2018 100 31/12/2018 Final bill payment
19 CHA/R-119 Improvement of Road From Golderhat - WDB Embk. (UZR Road) at Ch- 1000-2000.0m (length-1000.0m) (Road ID – 509254182) Construction of Palisading Work on Golderhat - WDB Embk. (UZR Road) at Ch- 1182 1196 RS, 1290-1321 LS, 1509-1521 RS, 1847-1867 RS (Length – 77.0m) Construction of (0.75m x 0.75m ) RCC U Drain on Golderhat - WDB Embk. (UZR Road) at Ch- 1595.00m Construction of (2.0m X 4.50m X 3.50m) RCC box Culvert on Golderhat - WDB Embk. (UZR Road) at Ch- 1994.00m 1.0000 85.604 M/S Eunus Al Mamun, Thana Road Charfashion, Bhola. 85.604 11/02/2018 10/11/2018 30 31/12/2018 ISG
20 CHA/R-118 Improvement of Road From Vhuter Khal - Mukharbanda Khal Near Farazi Bari (Mazahar Ali Road) at Ch- 00-1125.00m (length-1125m) (Road ID- 509254029) Construction of Palisading Work on Vhuter Khal - Mukharbanda Khal Near Farazi Bari (Mazahar Ali Road) at Ch- 233-271LS, 978-993 LS, 1094-1101 RS (length-60.0m) Construction of 7 no (0.75m x 0.75m ) RCC U Drain on Vhuter Khal - Mukharbanda Khal Near Farazi Bari (Mazahar Ali Road) at Ch- 58m, 114m, 235m, 549m, 755m, 875m & 1058m 1.1250 88.904 M/S Nabarun Traders Ltd, House No. 187/7, Lake Circus, Bashir Uddin road, Kalabagan, Dhaka-1205, Bangladesh 88.904 11/02/2018 10/11/2018 70 31/12/2018 WBM completed
21 CHA/R-117 Improvement of Road From Gazaria Shashibussion Road (Keramot Ali Moszid) - East way of Kuchiamora Madrasha Road Via College Road 02 No. Bridge Road at Ch- 00-2075.0m (length-2075m) (Road ID- 509254190) Construction of Palisading Work on Gazaria Shashibussion Road (Keramot Ali Moszid) - East way of Kuchiamora Madrasha Road Via College Road 02 No. Bridge Road at Ch- 811-835 RS, 825-834LS, 2050-2070 RS (length-53.0m) Construction of 5 no (0.75m x 0.75m ) RCC U Drain on Gazaria Shashibussion Road (Keramot Ali Moszid) - East way of Kuchiamora Madrasha Road Via College Road 02 No. Bridge Road at Ch- 294m, 1210m, 1323m, 1453m & 1982m Construction of (3.00m x 3.00m) RCC box Culvert on Gazaria Shashibussion Road (Keramot Ali Moszid) - East way of Kuchiamora Madrasha Road Via College Road 02 No. Bridge Road at Ch- 824.00m 2.0750 151.775 M/S Nabarun Traders Ltd, House No. 187/7, Lake Circus, Bashir Uddin road, Kalabagan, Dhaka-1205, Bangladesh 151.775 11/02/2018 10/02/2019 100 31/12/2018 BC Completed
22 CHA/R-116 Improvement of Road From West Side of RHD Road - Vhanchar Abason Project Via Moulobi Road at Ch- 1200-2200.0m (length-1000.0m) (Road ID- 509255062) Construction of (0.75m x 0.75m ) RCC U Drain on West Side of RHD Road - Vhanchar Abason Project Via Moulobi Road at Ch- 1900.0mConstruction of (3.00m x 3.00m) RCC box Culvert on West Side of RHD Road - Vhanchar Abason Project Via Moulobi Road at Ch- 1377.0m Construction of (2.0m x 4.50m x 3.50m) RCC box Culvert on West Side of RHD Road - Vhanchar Abason Project Via Moulobi Road at Ch- 1770.0m 1.0000 98.077 Md. Eunus Al Mamun, Thana Road Charfashion, Bhoal 98.077 20/03/2018 19/12/2018 0 31/12/2018 RE-Tender
23 CHA/R-115 IImprovement of Road From Kalmi bridge bazar-South Char Aicha bazar via Rasulpur UP Office Road at Ch- 7300-9800.0m (length-2500.0m) (Road ID- 509253041) Construction of Palisading Work on Kalmi bridge bazar-South Char Aicha bazar via Rasulpur UP Office Road at Ch- 8847-8868m LS (length- 21.0m) Construction of 2 no (1.50m x 1.50m) RCC box Culvert on Kalmi bridge bazar-South Char Aicha bazar via Rasulpur UP Office Road at Ch- 7836m & 8500m Construction of (3.00m x 3.00m) RCC box Culvert on Kalmi bridge bazar-South Char Aicha bazar via Rasulpur UP Office Road at Ch- 9690.0m Construction of (2.0m x 4.50m x 3.50m) RCC box Culvert on Kalmi bridge bazar-South Char Aicha bazar via Rasulpur UP Office Road at Ch- 9785.0m 2.5000 195.196 M/S Eunus al Mamun, Thana road Charfashion Bhola. 195.196 11/02/2018 10/02/2019 70 31/12/2018 WBM completed
24 CHA/R-114 Improvement of Road From Mukharbandha Khal (Bridge) - North way of Oli Mia Chowkider Bari (Principal Nazrul Islam Road). at Ch- 500-2000.0m (length-1500.0m) (Road ID- 509255156) Construction of Palisading Work on Mukharbandha Khal (Bridge) - North way of Oli Mia Chowkider Bari (Principal Nazrul Islam Road). at Ch- 955-960 RS, 1295-1310 LS, 1356-1368 RS, 1477-1500 LS, 1487-1513 RS, 1667-1684 RS (Length- 89.00) Construction of 8 no (1.50m x 1.50m) RCC box Culvert on Mukharbandha Khal (Bridge) - North way of Oli Mia Chowkider Bari (Principal Nazrul Islam Road). at Ch- 950m, 1044m, 1152m, 1237m, 1331m, 1629m, 1700m, & 1860m Construction of 4 no (0.75m x 0.75m) RCC box Culvert on Mukharbandha Khal (Bridge) - North way of Oli Mia Chowkider Bari (Principal Nazrul Islam Road). at Ch- 636.0m, 870m, 1823m & 1984m. 1.5000 139.075 M/S Jasim Construction, Bhola Sadar Bhola 139.075 11/02/2018 10/02/2019 70 31/12/2018 WBM completed
25 CHA/R-113 Improvement of Road From Kasemgonj Jalil Bapari Road (06 No Ward) - West way of Mollah Bari road. at Ch- 00-1200.0m (length-1200.0m) (Road ID- 509255092) Construction of Palisading Work on Kasemgonj Jalil Bapari Road (06 No Ward) - West way of Mollah Bari road. at Ch- 5-42m RS, 46-76M RS, 78-112M, BS, 112-141 RS, 412-427 RS, 438-451 RS, 473-495 RS, 618-630 RS, 696-717 RS, 803-853 RS, 914-939RS, 943-955 RS (Length- 334.0m) Construction of 6 no (0.75m x 0.75m) RCC U Drain on Kasemgonj Jalil Bapari Road (06 No Ward) - West way of Mollah Bari road. at Ch- 242m, 412m, 473m, 717m, 824m & 1122m Construction of (1.50m x 1.50m) RCC RCC box on Kasemgonj Jalil Bapari Road (06 No Ward) - West way of Mollah Bari road. at Ch- 100.0m 1.2000 109.099 M/S Nabarun Traders Ltd, House No. 187/7, Lake Circus, Bashir Uddin road, Kalabagan, Dhaka-1205, Bangladesh 109.099 11/02/2018 10/02/2019 100 31/12/2018 final bill payment
26 CHA/R-112 Improvement of Road From Boktirhat Baburhat Pucca Road (Kasem Akhon Bridge) - Sharek Khali Bridge Road. at Ch- 00-1500.0m (length-1500m) (Road ID- 509254191) Construction of 7 no (0.75m x 0.75m) RCC RCC box on Boktirhat Baburhat Pucca Road (Kasem Akhon Bridge) - Sharek Khali Bridge Road. at Ch- 165m, 244m, 500m, 722m, 810m, 1021m & 1142.0m 1.5000 117.739 M/S Eunus al Mamun, Thana Road Charfashion 117.739 11/02/2018 10/02/2019 50 31/12/2018 SUB on going
27 CHA/R-111 Improvement of Road From Charfassion Dularhat Road -Surudip Khal Road Via Hazirhat Road. at Ch- 1800-3750.0m (length-1950m) (Road ID- 509254051) Construction of Palisading Work on Charfassion Dularhat Road -Surudip Khal Road Via Hazirhat Road. at Ch- 1807-1823m RS, 1850-1865M RS, 1890-1917M LS, 1929-1948M RS, 1973-1990 LS, 2104-2113M RS (Length- 103.0m) Construction of 7 no (0.75m x 0.75m) RCC RCC box on Charfassion Dularhat Road -Surudip Khal Road Via Hazirhat Road. at Ch- 1994m, 2100m, 2250m, 2610m, 3191m, 3556m & 3570m. Construction of (3.0m x 3.0m) RCC box Culvert on Charfassion Dularhat Road -Surudip Khal Road Via Hazirhat Road. at Ch-.2890.0m 1.9500 161.356 M/S Khan Traders , 8340, Charfashion, Bhola 161.356 11/02/2018 10/02/2019 70 31/12/2018 WBM completed
28 CHA/R-110 Improvement of Road From RHD Road (Salam Patowary House) - West way of Buragaurango River Via Shashibussion Gazaria GC Road & West Awaspur 49 No.GPS Road at Ch- 1000-4000.0m (length-3000m) (Road ID- 509254085) 3.0000 238.204 Md. Eunus Al Mamun, Thana Road, Charfassion, Bhola 238.204 22/02/2018 14/02/2019 70 31/12/2018 WBM completed
29 CHA/R-109 Improvement of Road From Betua RHD (Lounch Ghat) - Char Aicha GC Via Chairman Bazar Road at Ch- 4000-8000.0m (length-4000m) (Road ID- 509252007) 4.0000 234.037 Nabarun Traders Limited, House#187/7, Basiruddin Road, Kalabagan, Dhaka 234.037 11/02/2018 10/02/2019 30 31/12/2018 ISG
30 CHA/R-108 Improvement of Road From Betua RHD (Lounch Ghat) - Char Aicha GC Via Chairman Bazar Road at Ch- 00-4000.0m (length-4000m) (Road ID- 509252007) 4.0000 234.037 Nabarun Traders Limited, House#187/7, Basiruddin Road, Kalabagan, Dhaka 234.037 11/02/2018 10/02/2019 70 31/12/2018 WBM completed
31 CHA/R-09 A. Improvement of Goni Chairman C.S-WDB Embk. via Omrabaz Cyclone Shelter Road at CH- 00-1000.00m. B. Construction of Palisading Work on Goni Chairman C.S-WDB Embk. via Omrabaz Cyclone Shelter Road at CH- 498.00-514.00m B/S, 622.00-630.00m L/S. ( Length 24m). C. Construction of 2 no’s (3.00mx4.50mx3.50m) (W-4.26m) Three Vent RCC Box Culvert on Goni Chairman C.S-WDB Embk. via Omrabaj Syclone Shelter Road . at CH- 230.00m & 445.00m. Road ID:509255007. 1.0000 110.901 M/S Fakrul Islam, Ward-01, Charfashion Pourashava, Bhola 110.901 22/06/2017 06/07/2018 100 31/12/2018 BC Complete
32 CHA/R-08 A. Improvement of Charfassion GC Dularhat GC (Kabir Shop) - North Way of Siddque Howladar Bazar Ghosher hat Road via Madrasha & Dularhat Adarsha Collage Road Ch.1200m-2990m, B) Construction of Palisading Work on Charfassion GC Dularhat GC (Kabir Shop) - North Way of Siddque Howladar Bazar Ghosher hat Road via Madrasha & Dularhat Adarsha Collage Road at Ch.1496m-1508m R/S, 1877m-1892m R/S, 1922m-1944m R/S, 2011m-2028m L/S, 2561m-2570m R/S, 2675m-2685m R/S, 2801m-2813m R/S. C) Construction of 1no (3.00m x 3.00m) (w-4.26m) RCC Box Culvert on Charfassion GC Dularhat GC (Kabir Shop) - North Way of Siddque Howladar Bazar Ghosher hat Road via Madrasha & Dularhat Adarsha Collage. at CH- 2410.00m. D) Construction of 5nos (0.75m x 0.75m) (w-5.5m) RCC Box Culvert on Charfassion GC Dularhat GC (Kabir Shop) - North Way of Siddque Howladar Bazar Ghosher hat Road via Madrasha & Dularhat Adarsha Collage. at CH- 1510m, 1940m, 2113m, 2712m, 2940m). Road ID: 509254119 1.7900 133.171 M/S Khan Traders, 8340, Charfassion, Bhola 133.171 22/06/2017 06/07/2018 100 31/12/2018 Final bill payment
4 Daulatkhan
1 DA/R-67 Improvement of Faruk miar hat-Noor miar hat to Eddgha road at CH- 00-480.00m (Length-480.0m) Road ID- 509295018 0.4800 33.208 Md. Ruhul Amin, Amin Villa, Muslimpara Bhola Sadar Bhola. 33.208 20/11/2017 12/08/2018 60 31/12/2018 WBM ON GOING
2 DA/R-154 Improvement of Improvement of Charpata Komaruddin to Angali rani Members house at CH- 1000-2427.0m (Effective Length- 1440.0m) Road ID: 509295051 Construction of 4 no (0.625m x0.625m) U Drain on Charpata Komaruddin to Angali rani Members house at CH- 1441.0m 1.4270 98.785 Md. Zakir Hossain, Md. Zakir Hossain, Masuma Khanam Road, Bhola 98.785 26/04/2018 17/04/2019 50 31/12/2018 Sub Base on going
3 DA/R-153 Improvement of Improvement of Chiltatali bazar UZR to Azim Rari Howla Madrasha road at Ch- 00-1455.0m (Effective Length- 1440.0m) Road ID: 509294020 Construction of (2.50m x 2.50m x 5.50m) RCC box Culvert on Chiltatali bazar UZR to Azim Rari Howla Madrasha road at Ch- 630.0m Construction of 4 no (0.625m x0.625m) U Drain on Chiltatali bazar UZR to Azim Rari Howla Madrasha road at Ch- 61m, 250m, 370m & 548.0m 1.4400 107.838 M/S Eli Enterprise, Sadar Road, Bhola 107.838 26/04/2018 17/04/2019 50 31/12/2018 WBM ON GOING
4 DA/R-152 Improvement of Charpata old kazir hat to Gharami bariat CH- 405-1405.0m (Effective Length- 1000.0m) Road ID: 509294024 Construction of 2 no (0.625m x0.625m) U Drain on Charpata old kazir hat to Gharami bariat CH- 792m & 1235m 1.0000 65.152 M/S Shanto Enterprise, Holding No-309, Ukilpara, Bhola 65.152 01/05/2018 22/09/2019 0 31/12/2018  
5 DA/R-151 Improvement of Improvement of North Jaynagar UP Office – Chalitatali Bazar Road at CH- 00-1386.0m (Effective Length- 1386.0m) Road ID: 509294030 Construction of 4 no (0.625m x0.625m) U Drain on North Jaynagar UP Office – Chalitatali Bazar Road at CH- 465m, 822m, 929m & 1301m 1.3860 95.802 M/S Sayem Enterprise, Kalinath Rayer Bazar, Sadar, Bhola 95.802 30/09/2018 21/09/2019 70 31/12/2018 WBM Completed
6 DA/R-07 A) Improvement of Kalakopa- Sanibari road at CH- 700-1700m. B) Improvement of Kalakopa- Sanibari road at CH- 719-811 R/S, 841-870 R/S, 1068-1086 L/S, 1377-1391 L/S, 1359-1389 R/S. ID: 509294031 (Including 3 nos Box Culvert) 1.0000 72.923 Md. Nazrul Islam Chunnu. Alinagor, Sadar, Bhola 72.923 22/06/2017 07/03/2018 70 31/12/2018 WBM Completed
7 DA/M-29 Earth Work on Khayer hat GC to Bhola-Charfession R&H Road at CH- 00-4880m (3144.36m3) Maintenance of Pavment & Surfacing Eorks on Khayer hat GC to Bhola-Charfession R&H Road at CH- 00-4880m (Length-4880.m) Road ID- 509294028 Construction of 4 no 1.0x1.0x5.50m RCC Box Culvert on Khayer hat GC to Bhola-Charfession R&H Road at CH- 240n, 626m, 1466m, 2913m Construction of Palisading work on Khayer hat GC to Bhola-Charfession R&H Road at CH- 690-721m L/S, 1898-1961m L/S, 3065-3107m L/S (Length-136.0m. 4.8800 99.107 Md. Farid Uddin, Daulotkhan Bazar, Daulotkhan, Bhola 99.107 20/11/2017 12/08/2018 100 31/12/2018 Final Bill Payment
8 DA/M-28 Earth Work on Noor miar hat to Chailtatali hat to Chailtatali hat UZR Road at CH- 00-4910m (2621m3) Maintenance of Pavment & Surfacing Eorks on Noor miar hat to Chailtatali hat to Chailtatali hat UZR Road at CH- 00-5315.0m (Length-5315.0m) Road ID- 509294013 Construction of 1.0x1.0x5.50m RCC Box Culvert on Noor miar hat to Chailtatali hat to Chailtatali hat UZR Road at CH- 1498.0m Construction of Palisading work on Noor miar hat to Chailtatali hat to Chailtatali hat UZR Road at CH- 178-184m L/S, 362-388m R/S, 465-480m L/S, 752-780m L/S, 667-684m R/S, 721-752m L/S, 844-862m L/S, 915-928m L/S, 968-985m L/S, 1002-1023m L/S, 1120-1129m L/S, 1175-1198m R/S, 1721-1729m R/S, 2201-2238m R/S, 2352-2364m R/S, 3150-3166m R/S, 3269-3306m R/S3426-3458m R/S, 4090-4102m R/S (Length-351.0m) 5.3150 134.563 M/S Sayem Enterprise, Kalinath Rayerbazar, Bhola Sadar, Bhola 134.563 18/10/2017 10/10/2018 100 31/12/2018 Final Bill Payment
9 DA/M-27 Earth Work on South charshuvi Faruk miar hat to Noormiarhat Raod at CH- 00-3407.0m (2143.0m3) Maintenance of Pavment & Surfacing Eorks on South charshuvi Faruk miar hat to Noormiarhat Raod at CH- 00-3470.0m (Road ID- 509294015) Construction of 5no 1.0mx1.0mx5.50m RCC Box Culvert on South charshuvi Faruk miar hat to Noormiarhat Raod at CH- 72.0m, 137m, 530m, 660m Construction of Palisading work on South charshuvi Faruk miar hat to Noormiarhat Raod at CH- 688-703 R/S, 728-745m L/S, 761-777 m L/S, 952-968 m L/S, 1057-1070 m L/S, 1074-1105 m L/S, 1250-1288 m R/S,, 1536-1558 m R/S, 1876-1955 m L/S, 2666-2685 m R/S,, 2968-2983m R/S, 2990-3020 m R/S,3030-3040 m R/S,3077-3086 m R/S,3170-3183 m R/S.3327-3339 m R/S, (Length-381.0m) 3.4700 100.195 M/S Farid Uddin, Daulatkhan Bazar, Bhola 100.195 25/10/2017 17/10/2018 100 31/12/2018 Final Bill Payment
10 DA/M-23 Maintenance of Banglabazaar-Daulatkhan R&H to (Kalim Patwary bari) to Helipad road at CH- 00-900.00m (Length- 900.0m) road ID- 509295058 Construction of Palisading work on Banglabazaar-Daulatkhan R&H to (Kalim Patwary bari) to Helipad road at CH- 30-52 LS, 245-281 LS, 315-335 RS, 393-424 RS. (Length- 109.0m) Construction of (1.0mx1.0mx5.50m) RCC Box Culvert on Banglabazaar-Daulatkhan R&H to (Kalim Patwary bari) to Helipad road at CH- 50.0m 0.9000 25.424 M/S Farid Uddin, Daulatkhan Bazar, Bhola 25.424 25/10/2017 17/04/2018 100 31/12/2018 Final Bill Payment
11 DA/M-22 Maintenance of Chailtatali-Noormiarhat road to Howlader para NGPS via mohon propesar bari at CH- 00-607.0m (Length – 607m) Road ID 509295069 Construction of Palisading work on Chailtatali-Noormiarhat road to Howlader para NGPS via mohon propesar bari at CH- 67-110 LS, 297-314 LS, 430-453 LS, 560-580 RS, 579-589 LS. (Length- 113.0m) 0.6070 17.809 M/S Rahima Construction, West Joynagar, Daulotkhan 17.809 18/10/2017 10/04/2018 100 31/12/2018 Final Bill Payment
12 DA/M-21 Maintenance of Daulatkhan GC to (Daulatkhan Live Stock office) Guinger hat-Daulatkhan UZR via Radhaballov GC road at CH- 00-720.0m (length-720.0m) road ID- 509293007 Construction of Palisading work on Maintenance of Daulatkhan GC to (Daulatkhan Live Stock office) Guinger hat-Daulatkhan UZR via Radhaballov GC road at CH- 239-260 RS, 355-367 RS, 432-459 RS, 465-484 RS, 503-517 RS, 565-591 RS, 604-615 RS, 654-705 RS. (Length- 181.0m) 0.7200 25.593 M/S Farid Uddin, Daulatkhan Bazar, Bhola 25.593 25/10/2017 17/07/2018 100 31/12/2018 Final Bill Payment
13 DA/M-20 Maintenance of Orni Brick field to Azimuddin Noor miar hat Road at CH- 00-909.0m (length-909m) road ID- 509295057 Construction of Palisading work on Orni Brick field to Azimuddin Noor miar hat Road at Ch-332-387m LS, 332-363 RS, 387-409 RS, 437-459 RS, 487-500 LS, 847-867 LS. (Length- 163.0m) 0.9090 23.961 M/S Rahima Construction,West Joynagar, Bhola 23.961 25/10/2017 10/04/2018 100 31/12/2018 Final Bill Payment
14 DA/M-06 0.6050 13.202 M/S Farid Uddin, Daulatkhan Bazar, Daulatkhan, Bhola. 13.202 14/06/2017 30/11/2017 100 31/12/2018 Final Bill Payment
15 DA/M-05 A. Maintenance of Moulovi Shanko to Bhola Charfassion RHD Road. from ch- 712m-1810m Road ID 509294029 1.0980 24.864 M/S Farid Uddin, Daulatkhan Bazar, Daulatkhan. 24.864 14/06/2017 30/11/2017 100 31/12/2018 Final Bill Payment
16 DAU/M-271 Periodic Maintenance of Banglabazar-Doulatkhan UZR (Hasmat Bepari Baro) to WAPDA Embankment at Ch. 00 -1082 m under DaulatkhanUpazila. (509295103) Periodic Maintenance of Noor Miar Hat-Chailtatali Raad-Palowan Bari Road at Ch. 00-585m under DaulatkhanUpazila. (509295097) Periodic Maintenance of Middle Kalakopa GPS road-Chowkider Bari road at Ch. 00 -.1063m under Daulatkhan Upazila. (509295049) 2.7250 99.914   99.914 0 31/12/2018  
17 DAU/R-237 Improvement of KalacopaHazibari Mosque to Box Ali road via St. Munshir hat road at CH -3340-3710.0m Road ID 509294001 Palisading Work at CH- 3530-3710.0m (Effective Length – 32.0m) on the same Road. Construction of (0.625m x 0.600m) RCC Box Culvert at CH- 3442.0m 0.3700 25.147 M/S Z.R Traders, Boro Manika, Manika, Borhanuddin, Bhola 25.147 0 31/12/2018  
18 DAU/R-236 Improvement of Charpata Nagar Member bari to North joynagarMadrash.road at CH- 00-852.0m Road ID - 509295013 0.8600 48.045 M/S Farid Uddin, Daulatkhan Bazar , Daulatkhan, Bhola 48.045 0 31/12/2018  
19 DAU/R-174 Improvement of Charpata UP office to Dhania bari road at CH- 00-792.00m (Effective Length – 792.00m) Road ID - 509294023 Palisading Work at CH- 00-792.0m (Effective Length – 104.0m) on the same Road. Construction of (0.625m x 0.600m) RCC Box Culvert at CH- 185.0m 0.7920 41.463 Md. Kamal Hossain, Kalakopa, Daulatkhan, Bhola 41.463 03/07/2018 25/06/2019 0 31/12/2018  
20 DAU/R-173 Improvement of Bangla bazar-Daulatkhan RHD to Miar hat hawlader road at CH- 00-766.0m (Bechu Maler bari to Ali Miar dighi) (Effective Length – 766.00m) Road ID - 509295066 Palisading Work at CH- 00-766.0m (Effective Length – 167.0m) on the same Road. Construction of 2 no (0.625m x 0.600m) RCC Box Culvert at CH- 372.0m & 623.0m 0.7660 55.393 Md. Farid Uddin, Daulatkhan Bazar, Daulatkhan, Bhola. 55.393 30/07/2018 29/06/2019 70 31/12/2018 WBM ON GOING
21 DAU/R-172 Improvement of Helipad road to Doska bridge at CH- 00-792.00 (Effective Length – 792.00m) Road ID - 509295011 Palisading Work at CH- 00-792.0m (Effective Length – 498.00m) on the same Road. 0.7920 72.295 Md. Kamal Hossain, Kalakopa, Daulatkhan, Bhola 72.295 30/07/2018 25/06/2019 0 31/12/2018  
5 Lalmohan
1 LAL/STR-274 Consruction of 25.00m Long RCC Gurder bridge on Lalmohan Chowmohoni-Karterhat (East) Road (Miar Hat Near Mawlana Nazrul Islam Bari at Ch.10m) at Ch.2+500Km Under Lalmohan, Bhola.(509543002) 254.234   254.234 0 31/12/2018  
2 LAL/R-273 Improvement of Mongol Shikder Bazar-Fatemabad Road-Lordhardings Chatla Bazer (South side of Chatla Mohammadia GPS) Road From Ch.00-1004m Lalmohan ID No-509545134 Improvement of Lalmohan Chawmohini- Balurchar Bazar Road From Ch.1925-2450m Lalmohan ID No-509543004 1.5650 156.618 Md. Akter Hossain, Pourakathali, Bhola Sadar, Bhola. 156.618 0 31/12/2018  
3 LAL/R-272 Improvement of Madrasha Bazar Road- Chan Miar Hat via Sayadabad GPS From Ch.1000-2006m Lalmohan ID No-509545022 Improvement of Taragonj Alamiah Madrasha Bazer-Miar Hat Road Via H/O Waziullah Sharder From Ch.00-925m Lalmohan ID No-509545176 2.0550 188.331 Md. Akter Hossain, Pourakathali, Bhola Sadar, Bhola. 188.331 0 31/12/2018  
4 LAL/R-260 Improvement of Char Bhuta UP- Chatla Bazar via Lengutia GPS Road From Ch.4200-5923m Lalmohan ID No-509543010 1.7000 154.490 M/S Howlader Construction, Shams Grehaion, Holding No – 734, Ward No-05, Lalmohon Bhola. 154.490 0 31/12/2018  
5 LAL/R-259 Improvement of Char Bhuta UP- Chatla Bazar via Lengutia GPS Road From Ch.2500-4200m Lalmohan ID No-509543010 1.7000 151.880   151.880 0 31/12/2018  
6 LAL/M-261 Maintenance of New ID & Name: Pachim Char Umed UPC-Gazaria Sluice Bazar Via Keramottoa Madrasha Road at CH- 00-1076.0m Old Name: Gazaria Senior Madrasha -Gazaria Sluice Bazer. Road ID 09544026 Maintenance of New ID & Name: Purba Char Ummed jalal Master Bari Bridge-Mugria Bazar from CH- 00-1415.0m ID 509545216. Old Name & ID: Old Muguria Bazar -New Muguria Bazar UNR 3001 ID 509544009. 2.4900 123.406 Md. Asadullah, Bhola Sadar, Bhola. 123.406 0 31/12/2018  
7 LAL/STR-254 (A) Construction of 40.0m long PC Gurder bridge on Lord Harding Up- Fatimabad Sluice Gate Bazar Road at CH- 2+100km Road ID 509543016 (B) Construction of 34.0m long RCC Gurder bridge on RHD North side of College to Hazir hat road at CH- 2+500km Road ID 509543008 592.361   592.361 0 31/12/2018  
8 LAL/GCM-245 (A) Development of Chairman Hat under Lalmohan UP(B) Development of Chatla Dalal Bazar under Lalmohan Upazila(C) Development of Lordharding Bazar under Lalmohan Upazila(D) Development of GM Bazar uunder Lalmohan Upazila(E) Development of Charbhuta Janata Bazar under Lalmohan Upazila(F) Development of Ramagonj Chawmohoni Bazar under Lalmohan Upazila(G) Development of South Khasher hat Bazar under Shambopur union under Tazimuddin Upazila(H) Development of Chatta Dowari Baza, under Chandpur union under Tazimuddin Tazimuddin Upazila 198.529 M/S Tahura Enterprise, 05 No Ward, Kalinath roy Bazar Bhola 198.529 0 31/12/2018  
9 LAL/R-246 Improvement of Lalmohan RHD-West very banth (Bedorkari road) Bhola Charfashion RHD( Ananda Bazar) Gaimara Sluice gate Bazar (Tofayel miah sarak) at CH- 00-1000.00m Road ID 50945063Construction of Palisading work at CH- 15m-832.0m (Effective Length- 74.0m) on the same roadConstruction of 2 no (0.75m x0.75m) RCC Box Culvert at CH- 28m & 660.0m on the same road. Construction of 2 no (1.50m x1.50m) RCC Box Culvert at CH- 28m & 660.0m on the same road Construction of (3.00x3.00m) RCC Box Culvert at CH- 581.0m on the same road 1.0000 95.476 Md. Nazrul Islam Cunnu, Alinagar, Bhola Sadar, Bhola 95.476 0 31/12/2018  
10 LAL/STR-209 Construction of RCC Box Culvert size (2x 4.50 x 4.50m) (W.5.50m) on Lordharding Up- Madrasha Bazar Embankment Road at CH- 1050.00m Road ID- 509543015 & Construction of of RCC Box Culvert size (2x 4.50 x 4.50m) (W.5.50m) on R&H (Shada Pol)-Kalirtak Bazer via Balam Char Kandi road at CH- 1010.00m Road ID-509544035 76.693 M/S Bhuya Enterprsie 76.693 26/08/2019 0 31/12/2018  
11 LAL/STR-130 Consruction of 20.0m RCC Gurder bridge on Ramagonj UP - Miar Hat Road at CH- 3200.0m (ID No- 509543011) Earth Work on Ramagonj UP - Miar Hat Road at CH- 3200.0m 145.779 Md. Rashaduzzaman Peter, Md. Rashaduzzaman Peter, Ward No.04, Lalmohan, Bhola 145.779 70 31/12/2018 Abultment work on going
12 LAL/R-57 Improvement of Raychad Road- Katatara Khal road at CH- 00-2000.0m (Length- 2000m) Raod ID- 509544001Construction of Palisading Work on Raychad Road- Katatara Khal road at CH- 1040m R/S, 15-50m L/S, 1385-1405m R/S, 1880-1900m R/S. (Length- 105.0m) Construction of 3 no (1.50mx1.50m) RCC box Culvert on Raychad Road- Katatara Khal road at CH- 420m, 1385m & 1900m Construction of 3 no (0.75x0.75m) RCC box Culvert on Raychad Road- Katatara Khal road at CH- 250m, 900m & 1700m 2.0000 146.113 Md. Iqbal Hossain, Rahim Villa, Poura Kathali, Bhola Sadar, Bhola. 146.113 20/06/2017 12/03/2018 60 31/12/2018 Sub Base on going
13 LAL/R-55 Improvement of Hazigonj Junior High School-Betua river (H/o Bazlu Mia road) Banghabandhu Sarak road at Ch- 2700-3450.0m (length-750m ) Road ID- 50945167 Construction of Palisading Work on Hazigonj Junior High School-Betua river (H/o Bazlu Mia road) Banghabandhu Sarak road at Ch- 2740-2769m R/S, 2881-2900m R/S, 2940-2950m L/S, 3010-3035m L/S. (Length – 83.0m) Construction of 3 no RCC (0.75x0.75m) box Culvert on Hazigonj Junior High School-Betua river (H/o Bazlu Mia road) Banghabandhu Sarak road at Ch- 2710m, 3073m & 3370m 0.7500 54.930 M/S Ma Moni Enterprise, 8 no Word Pourashava, Lalmohon Bhola. 54.930 25/10/2017 17/07/2018 50 31/12/2018 WBM on going
14 LAL/R-54 Improvement of Natun Bazar (Lordharding) - Char Udaykhali Wapda Road at CH- 00-1050m (Length – 1050m ) Road ID- 509545004Construction of Palisading Work on Natun Bazar (Lordharding) - Char Udaykhali Wapda Road at CH- 14-20m BS, 24-32m BS, 300-312m LS, 514-532m RS. (length- 58.0) Construction of RCC (3.0mx3.0m) box Culvert on Natun Bazar (Lordharding) - Char Udaykhali Wapda Road at CH- 20m Construction of 5 no RCC (0.75x0.75m) box Culvert on Natun Bazar (Lordharding) - Char Udaykhali Wapda Road at CH- 20m 1.0500 89.138 M/S Bhuya Enterprise, Charfashion Bhola 89.138 25/10/2017 17/07/2018 50 31/12/2018 WBM on going
15 LAL/R-53 Improvement of Fatemabad barri-H/o Jashim member towards west road at CH- 00-500m (Total Length = 500m) Road ID- 50945112Construction of Palisading Work on Fatemabad barri-H/o Jashim member towards west road at CH- 125-146.0m (Total Length – 21m ) Construction of 2 no RCC (0.75x0.75m) box Culvert on Fatemabad barri-H/o Jashim member towards west road at CH- 105m & 470mTalukder Bari(Madrasha)- Bodi Ker Bari at Ch. 100-125m L/S, 525-552m L/S, 580-603m L/S, 655-678m L/S, 770-805m L/S. & RS. (Length- 195.0m) 0.5000 35.112 M/S Bhuya Enterprise, Charfashion Bhola 35.112 25/10/2017 17/07/2018 60 31/12/2018 WBM on going
16 LAL/R-51 Improvement of Chatla Bazar C/C Clinic - Shambhupur Border via Saji Chawmohoni Road at Ch- 00-1000.00m (BC Pavement Length 822m) Road ID 509544015 Construction of Palisading Work on Chatla Bazar C/C Clinic - Shambhupur Border via Saji Chawmohoni Road at Ch- 61-134m LS, 158-181m LS, 231-240m LS, 697-704m LS, 963-977m LS, 440-460m RS. (Total Length- 315m). Construction of 3 no ( 0.75x0.75) ( W5.5) RCC BOX Culvert on Chatla Bazar C/C Clinic - Shambhupur Border via Saji Chawmohoni Road at Ch- 65.0m, 431.0m, & 771.0m. 0.8220 76.457 M/S Bhuya Enterprise, Charfashion, Bhola, Bhola. 76.457 05/10/2017 27/06/2018 100 31/12/2018 Final Bill Payment
17 LAL/R-50 Improvement of Dhaligournagar Janata Mongol Sikder Hospital-Chatla Bazar road at CH- 00-822.00m. (BC Pavement Length 822m) Road ID 50945130 0.8220 74.164 M/S Elias Enterprise, Bhola Sadar, Bhola. 74.164 17/01/2018 16/10/2018 100 31/12/2018 BC Completed
18 LAL/R-40 Improvement of Ramagonj UP- Miar Hat Road at CH- 00-2400.00m Road ID 509543011 (BC Pavement Length 2400m) Construction of Palisading Work on Ramagonj UP- Miar Hat Road at CH- 4-26m LS, 45-55m LS, 1252-1269m LS, 1676-1701m LS, 99-108m RS, 556-568m RS, 1140-1171m RS, 1188-1211m RS. (Length- 149m). Construction of 7 no ( 0.75x0.75) ( W5.5) RCC BOX Culvert on Ramagonj UP- Miar Hat Road at CH- 67m, 157m, 657m, 752m, 975m, 1150m, 2154m. 2.4000 168.794 M/S Nazimuddin Traders Ward No-06, Mahajon Patti , Sadar Road Bhola 168.794 13/11/2017 05/11/2018 75 31/12/2018 WBM completed
19 LAL/R-39 Improvement of Road from RHD (Asholi Minar Mosque) HQ Kader Master Master Road at CH- 00-980m Road ID 509545149 (BC Pavement Effective Length 813m) Construction of Palisading Work on RHD (Asholi Minar Mosque) HQ Kader Master Master Road at CH- 07-18m LS, 31-42m LS, 463-470m LS, 754-786m LS, 127-135m RS. (Length- 69m). Construction of 5 no ( 0.75x0.75) ( W5.5) RCC BOX Culvert on RHD (Asholi Minar Mosque) HQ Kader Master Master Road at CH- 77m, 176m, 283m, 819m, 933m. 0.8130 63.091 M/S Moni Enterprise, 8 no Ward, Pourashava, Lalmohon, Bhola. 63.091 25/09/2017 27/06/2018 100 31/12/2018 BC Completed
20 LAL/R-38 Improvement of UNR 3012 (Asrafia C/C - Chandrima Abason Kheyaghat via Anisol Miar Hat & Dider Mosque road at CH- 00-1000m. Road ID 509544045 (BC Pavement Length 752m) Construction of Palisading Work on UNR 3012 (Asrafia C/C - Chandrima Abason Kheyaghat via Anisol Miar Hat & Dider Mosque road at CH- 2136-2154m LS,2183-2199m LS, 2355-2375m LS, 2149-2162m RS, 2755-2771m RS. (Length- 83m). Construction of 4 no ( 0.75x0.75) ( W5.5) RCC BOX Culvert on UNR 3012 (Asrafia C/C - Chandrima Abason Kheyaghat via Anisol Miar Hat & Dider Mosque road at CH- 2245m,2397m, 2627m, 2837m. 0.7520 57.268 Md. Raseduzzaman Petar, 8330, Lalmohon , Bhola . 57.268 05/10/2017 27/06/2018 40 31/12/2018 Sub base on going
21 LAL/R-37 Improvement of Chatla Dalal bazar UZR (Bawaria RNGPS) Dafadar bari road at CH- 00-1000m. Road ID 50945126 (BC Pavement Length 1000m) Construction of 2 no ( 0.75x0.75) ( W5.5) RCC BOX Culvert on Chatla Dalal bazar UZR (Bawaria RNGPS) Dafadar bari road at CH- 42m &810m. 1.0000 65.590 Md. Mokanmel Enterprise, Lalmohon, Bhola 65.590 05/10/2017 27/06/2018 100 31/12/2018 Final Bill Payment
22 LAL/R-226 Improvement of Anndaprosad Rakhit road (Betua river-UNR 3007) (New Name UZR 2009 (HQ) Safiul Sarder – Diner Baper Kheyaghat via GM Bazar) from at CH – 00-1000.00m Road ID- 50945115 Construction of (2x4.0x3.50m) RCC Box Culvert at CH- 924.0m on the same road. Construction of (0.75m x0.75m) RCC Box Culvert at CH- 385.0m.0m on the same road. 1.0000 84.377 M/S Santo Enterprise, Holding No-309, Ukilpara, Bhola 84.377 0 31/12/2018  
23 LAL/R-225 Improvement of Lalmohan 2 No. GPS-Fulbagicha road at CH – 00-1550.0m Road ID 50945082 Palisading work at CH- 12-1362.0m (Effective Length- 121.0m) on the same road Construction of 6 no (0.75m x0.75m) RCC Box Culvert at CH- 44,220,497,671,982, & 1272.0m.0m on the same road. Construction of (1.50m x 1.50m) RCC Box Culvert at CH- 1453.0m on the same road. 1.5500 119.383 M/S Santo Enterprise, Bhola Sadar, Bhola 119.383 0 31/12/2018  
24 LAL/R-224 Improvement of Munshir Hawla (H/o Dulu Miah)-Patowary Bari-Dewan bari Via Hazi Solayman Reg. NGPS road at CH- 00-750.0m Road ID 509545081 Palisading work at CH- 30-613.0m (Effective Length- 121.0m) on the same road Construction of 5 no (0.75m x0.75m) RCC Box Culvert at CH- 117,318,422,575, & 706m on the same road. 0.7500 62.451 M/S Apu Enterprise, Narkathi, Barishal Sadar, Bhola 62.451 0 31/12/2018  
25 LAL/R-223 Improvement of Rahimpur Bridge - Yasin Gonj UNR road at CH- 00-1000.0m Road ID 509545068 Palisading work at CH- 35-1000.0m (Effective Length- 121.0m) on the same road Construction of 2 no (1.50m x 1.50m) RCC Box Culvert at CH- 280.0m & 500.0m on the same road. Construction of 2 no (0.75m x0.75m) RCC Box Culvert at 1.0000 82.678 M/S Howlader Traders & Construction, Bhola Sadar, Bhola. 82.678 0 31/12/2018  
26 LAL/R-222 Improvement of Monglakikder Road (East side of Dalal Bazer)-Tozummuddin LALder road at CH- 00-970.0m Raod ID 509545031. Palisading work at CH- 2-390.0m (Effective Length- 75.0m) on the same road Construction of 2 no (1.50m x 1.50m) RCC Box Culvert at CH- 280.0m & 500.0m on the same road. Construction of 3 no (0.75m x0.75m) RCC Box Culvert at CH- 98.0m, 661.0m & 910.0m on the same road. 0.9700 81.751 M/S Santo Enterprise, Holding No-309, Ukilpara, Bhola 81.751 0 31/12/2018  
27 LAL/R-221 Improvement of Rahimpur GPS - Abdul Motaleb Dakhil Madrasha road at CH- 00-500.0m Road ID 509544057 Construction of Palisading work at CH- 30m-75.0m (Effective Length- 45.0m) on the same road Construction of (0.75m x0.75m) RCC Box Culvert at CH- 261.0m, 318.0m, & 456.0m on the same road. 0.5000 40.751 M/S Shawdagor Traders , Post-Khasher hat, Tazumuddin, Bhola. 40.751 0 31/12/2018  
28 LAL/R-220 Improvement of UZR 2003 (H/O) Moslem Uddin - Sambhupur LALder via Master Bazar raod at CH – 00-500.0m Road ID 509544053 Construction of (1.50m x 1.50m) RCC Box Culvert at CH- 230.0m on the same road. Construction of (0.75m x0.75m) RCC Box Culvert at CH- 477.0m on the same road. 0.5000 39.084   39.084 0 31/12/2018  
29 LAL/R-219 Improvement of Gazaria-Shashibhushan road (H/o Abu Musa commender)-Pangashia bazer road at CH- 00-500.0m Road ID 509544046 Construction of Palisading work at CH- 110m-123.0m (Effective Length- 22.0m) on the same road Construction of (0.75m x0.75m) RCC Box Culvert at CH- 287.0m on the same road. 0.5000 35.493 M/S Md. Shahabuddin Ward No-09, Paurachar Jangal, Bhola Pourasava, Bhola Sadar, Bhola 35.493 0 31/12/2018  
30 LAL/R-213 Improvement of Nazirpur RHD (GP Tower) - Habi Howladar bari vote Kendra – Nabinagar Bazar road at CH- 3660-4700.0m Road ID 50945195 Construction of Palisading work at CH- 3675-4696.00m (Effective Length- 201.0m) on the same road. Construction of (1.50m x 1.50m) RCC Box Culvert at CH- 3660.0m on the same road Construction of 2 no (0.75m x0.75m) RCC Box Culvert at CH- 4077m, 4288.0m on the same road.. 1.0400 82.379 M/S Tahura Enterprise, 05 No Ward, Kalinath roy Bazar Bhola 82.379 0 31/12/2018  
31 LAL/R-19 Improvement of Torabagonj Pas pagar more-UNR road at CH- 00-1000m. Road ID 50945226 (BC Pavement Length 1000m) Construction of Palisading Work on Torabagonj Pas pagar more-UNR road at CH- 26-40m L/S, 110-115 L/S, 480-490m L/S, 990-1000m L/S. Road ID 50945226 (Length- 39m). 1.0000 60.295 Md. Akter Hossain, Pourakathali Bhola Sadar Bhola. 60.295 07/12/2017 04/05/2018 70 31/12/2018 WBM Completed
32 LAL/R-18 A. Improvement of Road from Lalmohan UP office-Baklali bari road at CH- 00-1000m. Road ID 50945087 (BC Pavement Length 1000m) B. Construction of Palisading Work on Lalmohan UP office-Baklali bari road at CH-225-238 m L/S, 532-548 m L/S, 550-562 m L/S, 640-661 m L/S, 765-785 m L/S, 893-907 m R/S, 973-983 m R/S. Road ID 50945087 (Length- 106m). 1.0000 63.147 Md. Asadullah Bhola Sadar Bhola 63.147 07/02/2017 17/03/2018 100 31/12/2018 final Bill Payment
33 LAL/R-170 Improvement of Mongol Sikder bazar Fadebad Sluice gate bazar via Lord Harding UP road at CH- 3950-5300m (Effictive Length- 1350.0m) Road ID- 509543007 (old) 509542009 (new Construction of 3x4.50x4.50 (W-5.5) RCC Box Culvert on the Same Road at CH- 7420.0m) 1.3500 80.080 M/S Md. Javed, Pawro Khatli, Bhola 80.080 25/06/2018 24/06/2019 0 31/12/2018  
34 LAL/R-17 A. Improvement of road from RHD-Boddhi bari Char Road at CH- 00-1000m. Road ID 509545069 (BC Pavement Length 1000m). B. Construction of Palisading Work on RHD-Boddhi bari Char Road Road at CH- 520-540m R/S, 568-587m L/S. Road ID 509545069 (Length- 39m). 1.0000 60.378 Md. Iqbal Hossain, Bhola Sadar 60.378 20/06/2017 12/03/2018 50 31/12/2018 WBM on going
35 LAL/R-16 Improvement of Muguria Bazar-UZR-2002 (Fazal Munsir Bari Mosque) via Janata Bazar via Bangla Bazar road at CH- 2000-3000m. Road ID 509544004 (BC Pavement Length 1000m) Construction of Palisading Work on Muguria Bazar-UZR-2002 (Fazal Munsir Bari Mosque) via Janata Bazar via Bangla Bazar road at CH- 2125-2135m L/S & 2213-2253m L/S. Road ID 509544004 (Length- 50m). 1.0000 57.076 Md. Asadullah, 8300, Bhola Sadar Bhola 57.076 07/12/2017 04/04/2018 100 31/12/2018 Final Bill Payment
36 LAL/R-155 Improvement of -UNR 3008 (Gudir Pole) - Nazirpur via Tarullah Bridge Road at CH- 2500-4010.0m (Length- 1510.0m) Road ID -509544011 Construction of Palisading Work on UNR 3008 (Gudir Pole) - Nazirpur via Tarullah Bridge Road at CH- 2584-2632m L/S, 2696-2738m L/S, 3920-3966m L/S, 2564-2594m R/S. ( Length- 166.0m) Construction of 6 no (0.75m x 0.75m) RCC Box Culvert on UNR 3008 (Gudir Pole) - Nazirpur via Tarullah Bridge Road at CH- 2613m, 3197m, 3287m, 3376m, 3695m, & 3895m. 1.5100 116.159 Md. Akter Hossain, Pourakathali, Bhola Sadar, Bhola 116.159 30/04/2018 21/04/2018 40 31/12/2018 sub base on going
37 LAL/R-105 Improvement of Paschim Char Umed Samsul Haque road at CH- 00m-1304m (Length- 1304.00m. Road ID- 509545105) Construction of Palisading work on Paschim Char Umed Samsul Haque road at CH - 730-736m, LS, 736-756 RS, 777-800M LS, 796-816M, RS, 821-836M LS, 868-878M RS, 904-914M RS (Length – 104m) Construction of 2 no (1.50mx1.50m) RCC Box Culvert on Paschim Char Umed Samsul Haque road at CH -32.0m & 980.0m Construction of 2 no (0.75x0.75m) RCC Box Culvert on Paschim Char Umed Samsul Haque road at CH – 586.0m & 644.0m 1.3040 106.241 M/S Santo Enterprise, Holding no- 309, Ukilpara, Bhola. 106.241 12/02/2018 10/02/2019 40 31/12/2018 str completed
38 LAL/R-104 Improvement of UNR 3013 to Azam Road via Purba Kachuakhali GPS (Awlad Hossain Road) at CH- 00m-590m (Length- 590.00m. Road ID- 509544044) Construction of 1 no (1.50mx1.50m) RCC Box Culvert on UNR 3013 to Azam Road via Purba Kachuakhali GPS (Awlad Hossain Road) at CH- 295.00m Construction of 1 no (0.75x0.75m) RCC Box Culvert on UNR 3013 to Azam Road via Purba Kachuakhali GPS (Awlad Hossain Road) at CH- 22.00m 0.5900 45.358 M/S Santo Enterprise, Holding no- 309, Ukilpara, Bhola 45.358 11/02/2018 10/07/2018 60 31/12/2018 WBM on going
39 LAL/R-06 A. Improvement of Paschim Char Umed UPC (RHD)-Amin Miar hat via Soinik bazar road (Lalmohan Part)(Ch.3480m-4440m ). B. Improvement of Road From Paschim Char Umed UP (RHD)-Amin Miar bazar via Soinik bazar road (Lalmohan Part) (Ch.3900m-3928m L/S, 4111-4123m L/S). (Palisading Work Length 40m). C. Construction of 1 no’s (1.5m x 1.5m) (w-5.5m) Size Box Culvert on Paschim Char Umed UP (RHD)-Amin Miar bazar via Soinik bazar road (Lalmohan Part) (Ch.3988m ). D. Construction of 2nos (0.75m x 0.75m) (w-5.5m) RCC Box Culvert on Paschim Char Umed UP (RHD)-Amin Miar bazar via Soinik bazar road (Lalmohan Part) (Ch.3775m & 4240m ). Road ID: 509543019 0.9600 67.985 M/S Bhuya Enterprise, Charfassion, Bhola. 67.985 06/07/2017 31/03/2018 100 31/12/2018 final Bill Payment
40 LAL/R-05 A) Improvement of Lordharding UPC- Fatemabad Sluice Gate Bazar Road from Ch.4300m-5710m B) Construction of 3 no’s (1.5m x 1.5m) (w-5.50m) Size Box Culvert on Lordharding UPC- Fatemabad Sluice gate Bazar Road at Ch.4460.00m, 4820.00m & 5460.00m. C) Construction of 3 no’s (0.75m x 0.75m) RCC Culvert on Lordharding UPC- Fatemabad Sluice gate Bazar Road at Ch. 2157m, 2225m 2419m, 2780m, 3008m & 3216m). Road ID: 509543016 1.4100 99.708 Md. Iqbal Hossain, Rahima Villa, Poura Kathali, Bhola Sadar. Bhola 99.708 06/11/2017 04/02/2018 75 31/12/2018 WBM on going
41 LAL/M-210 Maintenance of Banglabazar (North Side) Kobkhali Bazar Embankment via Nayabhanguni GPS UNR 3001 Azhar Road - Patoary Bazar via Kazir Bazar at CH- 990-1839.0m & 2842-4017.0m (Effective Length- 2014.0m) Road ID- 509544010 Construction of 4 no RCC (0.75x 0.75m) Box Culvert on the same road at CH- 1082m, 2982m, 3044m, & 3103.0m 2.0140 105.492 M/S Bhuya Enterprise, Charfassion, Bhola 105.492 24/06/2019 0 31/12/2018  
42 LAL/M-208 Maintenance of RHD- Maddha Gazaria RNGPS - Kalir Take Bazar via Motaher Master Bari & Dewal Kandi GPS at CH-00-1000.0m (Effective Length -1000.0m) Road ID 509544061(old) 509543017 (New) Palisading Work at ch- 55-946.00m 0m (Effective Length -372.00.0m) on the same road. Construction of (1.50 x 1.50m ) & (3.0x3.0m) RCC Box Culvert on the same road at CH- 532m & 945.0m 1.0000 63.575 M/S Santo Enterprise, Bhola Sadar, Bhola 63.575 0 31/12/2018  
43 LAL/M-205 Maintenance of RHD (Balur tak) - Hazir hat Road at CH- 00-1955.0m (Effective Length -1955.0m) Road ID 509544052 1.9500 53.577 M/S Happy Enterprise, Lalmohon Powrashava, Bhola 53.577 18/01/2019 0 31/12/2018  
44 LAL/M-204 Maintenance of Madrasha Bazar- Chan Miar Hat via Sayadabad GPS at CH- 00-1275.0m (Effective Length -1275.0m) Road ID 509545022 Construction of 4 no (0.75m x 0.75m) RCC Box Culvert at CH- 210m, 360m, 670m & 860m on the same Road. 1.2700 42.573 M/S Bhuya Enterprise, Charfashion, Bhola 42.573 18/01/2019 0 31/12/2018  
45 LAL/M-203 Maintenance of Road from RHD (Nurunnabi Chowdhury Collage)-Moazzem Bazar Debir Char Bazar-Mojam Bazar road at CH- 550-1225.0m (Effective Length -675.0m) Road ID 509544012 0.6750 11.691 M/S Happy Enterprise, Lalmohon Pourashava, Bhola 11.691 18/01/2019 0 31/12/2018  
46 LAL/M-190 Maintenance of Muguria Bazar 2002 (Fazle Rahman Munshi Bari Mosque) via Bangla Bazar Ch. 00m - 2000m (509544004). (Effective Length 2000.00 m) Palisading Work (Effective Length 254.00 m) on the same Road. Construction of 6 no (0.75m x 0.75m) RCC Box Culvert at CH- 238m, 554m, 804m, 953m, 1844m, & 1900.0m on the same Road. 2.0000 77.542 M/S Diganto Construction, Lalmohan, Bhola 77.542 24/06/2018 24/06/2019 20 31/12/2018 STR on going
47 LAL/M-189 Maintenance of Lordharding UP- Fatemabad Sluice Gate Bazar Road Ch. 00m - 1000m (509543016). (Effective Length 1000.00 m) Construction of 2 no (0.75m x 0.75m) RCC Box Culvert at CH- 97m & 780.0m on the same Road. 1.0000 35.115 M/S Mokammal Enterprise, Prop: Md Zulfqar Ali, 7/404, Modhuchanda to college road, Lalmohan, Bhola 35.115 28/06/2018 27/12/2018 0 31/12/2018  
48 LAL/M-188 Maintenance of Farargong UP to - Miar Hat Road Ch. 4400m - 5677m (509543011). (Effective Length 1277.00 m) Construction of (0.75m x 0.75m) & 3 no (1.50m X 1.50m) RCC Box Culvert at CH- 5492m, 4415m, 4554m, & 4682.0m on the same Road. 1.2770 46.042 M/S Shawdagor Traders, Kasherhat, Tazumuddin, Bhola 46.042 28/06/2018 27/12/2018 0 31/12/2018  
49 LAL/M-187 Maintenance of RHD at Kassopia Jame Moshjid- Gazaria GC via Farargonj UP Road (New name) Ch. 1317m - 2317m (509542010). Nazirpur Bazar-Paschim Char Umed Via Farazganj UP Road (old name & ID No 509543012) from Ch. 3800m - 4800m (Effective Length 1000.00 m) Palisading Work (Effective Length 78.00 m) on the same Road. Construction of (0.75m x 0.75m) RCC Box Culvert at CH- 1437 on the same Road. 1.0000 35.120 M/S Mokammal Enterprise, Prop: Md Zulfqar Ali, 7/404, Modhuchanda to college road, Lalmohan, Bhola 35.120 28/06/2018 27/12/2018 0 31/12/2018  
50 LAL/M-186 Maintenance of Abu gong Bazar RHD - Fulbagisa Bazar (UZR)- Kharakandi & mizipara GPS- Talpta Bazar UZR (New name) Border (UNR). Fulbagisa Bazar(UZR)- Mofix tori Sikder Bari (old name & ID No 509545094) from Ch. 1277m -2500m (509545078) (Effective Length 1223.00 m) 1.2230 33.468 M/S Promee Enterprise, 5 No ward, Lalmohan, Bhola 33.468 0 31/12/2018 NOA Issure
51 LAL/M-185 Maintenance of Farazganj UPC-Gaimara Slauice gate bazaar via Gaimara GPS Road (New name). Farazganj UP-Gaimara GPS Road (old name & ID No 509544027) from Ch. 00-1000.0m (509543020) (Effective Length 1000.00 m) Construction of 3 no (0.75m x 0.75m) RCC Box Culvert at CH- 156.0m, 331.0m, & 463.0m on the same Road. 1.0000 35.880 M/S Shanto Enterprise, Holding No.309, Ukil Para, Bhola 35.880 27/06/2019 27/12/2018 0 31/12/2018  
52 LAL/M-184 Maintenance of Abu gong Bazar RHD - Fulbagisa Bazar(UZR)- Kharakandi & mizipara GPS- Talpta Bazar UZR (New name) Border (UNR). Fulbagisa Bazar(UZR)- Kharakandi Border (UNR) (old name & ID No 509545089) from Ch. 2510m - 3830m (509545078) (Effective Length 1320.00 m) Palisading Work (Effective Length 53.00 m) on the same Road. Construction of (0.75m x 0.75m) RCC Box Culvert at CH- 2626m on the same Road. 1.3200 45.887 M/S Julfikar Ahmed, Pawro Khatli, Muslim Para, Bhola 45.887 25/06/2018 24/12/2018 0 31/12/2018  
53 LAL/M-15 Maintenance of H/O Khan Shahed - H/O Mamun Nadda towards South Direction at CH- 00-1730.0m (BC Pavement Length 1730m) Road ID - 509544016 1.7300 58.827 M/S Bhuya Enterprise, Charfashion, Bhola 58.827 25/10/2017 17/07/2018 100 31/12/2018 Final Bill Payment
54 LAL/M-07 Periodic Maintenance (PM Overlay) of road from Paschim Char Umed UP (RHD)-Amin Miar Hat via Soinik bazar road (Lalmohon Part) from Ch.2370m-3480m) Road ID: 509543019 (BC Pavement Length-1110m). 1.1100 26.029 Md. Asadullah Bhola Sadar Bhola. 26.029 25/01/2017 17/12/2017 100 31/12/2018 Final Bill Payment
6 Monpura
1 MON/R-192 Improvement of Nutan Bazar Road –Julfikar Ali GPS ( UZR-2) – Haris Rokea GPS Road at CH- 00-1000.0m (Effective Length- 985.0m) Road ID- 509654057 Construction of 4 no (0.75x0.75m) RCC Box Culvert on the Same Road at CH- 7.0m, 475.0m, 650.0m, & 910.0m 0.9850 78.394 Md. Jasim Construction, Thana Road, Charfassion, Bhola. 78.394 25/06/2018 24/06/2019 0 31/12/2018  
2 MON/R-191 Improvement of UZR - Pal Bari - Koralia Bazar - West Embankment Road at CH- 890-2090.0m (Effective Length- 1115.0m) Road ID 509654039 Construction of (1x2.50x2.50m) RCC Box Culvert on the Same Road at CH- 1337.0m 1.1150 89.629 M/S Bokshi Enterprise, Prop: Md. Arman Bokshi, Charfassion, Bhola. 89.629 24/06/2018 23/06/2019 0 31/12/2018  
3 MON/R-150 Improvement of Kalatoli Abassion Bazar - Monir Bazar - Kabir Bazar Roadat CH- 00-1000.00m. (Effective Length- 1000.0m) Road ID: 509654055 1.0000 88.550 M/S Bokshi Enterprise, Md. Arman Bokshi, Charfassaion, Bhola 88.550 30/04/2018 21/04/2019 0 31/12/2018  
4 MON/R-149 Improvement of East EMBK. - UZR - West EMBk. Surazamukhi Bazar Road at CH- 00-1800.00m. (Effective Length- 1789.0m) Road ID: 509654015 Construction of 4 no (0.75m x 0.75m) RCC Box Culvert no East EMBK. - UZR - West EMBk. Surazamukhi Bazar Road at CH- 275.0m, 610.0m, 810.0m &1382.0m. Construction of (2 x 3.50m x 4.00m) RCC Box Culvert no East EMBK. - UZR - West EMBk. Surazamukhi Bazar Road at CH- 1565.0m 1.8000 166.443 M/S Jasim Construction, Thana Road, Charfassaion, Bhola 166.443 30/04/2018 21/04/2019 0 31/12/2018  
5 MON/R-148 Improvement of Rahamanpur Delur Dokan – Shakuchia UZR – Nuton Bazar road at CH- 00-1080.00m. (Effective Length- 1080.0m) Road ID: 509654063 Construction of (0.75m x 0.75m) RCC Box Culvert no North Sakuchia UP office - Char Goalia - Batankhali Bazar road at CH- 390.0m 1.0800 95.851 M/S Bokshi Enterprise, Md. Arman Bokshi, Charfassaion, Bhola 95.851 30/04/2018 21/04/2019 0 31/12/2018  
6 MON/R-147 Improvement of Alom Bazar –Anondo Bazar (UZR-2) Taltoli Bazar Road at CH- 00-1000.00m. (Effective Length- 1000.0m) Road ID: 509654058 1.0000 85.242 M/S Khan Traders Thana road Charfashion 85.242 0 31/12/2018  
7 MON/R-146 Improvement of Rahmanpur Koralia Bazar UZR - Majher Ghat South EMBK. Road at CH- 1220-5100.00m. (Effective Length- 3839.0m) Road ID: 509654013 Construction of 2 no (0.75m x 0.75m) RCC Box Culvert no Rahmanpur Koralia Bazar UZR - Majher Ghat South EMBK. Road at CH- 1620.0m & 2370.0m 3.8390 342.714 Md. Eunus Al Mamun, Thana Road, Charfassion, Bhola 342.714 30/04/2018 21/04/2019 0 31/12/2018  
8 MON/R-145 Improvement of Koralia bazar - Kachiakhali - Shikder hat Halot Road at CH- 1300-3120.00m. (Effective Length- 1805.0m) Road ID: 509654032 Construction of 2 no (0.75m x 0.75m) RCC Box Culvert no Koralia bazar - Kachiakhali - Shikder hat Halot Road at CH- 2215.0m, 2590.0m & 2850.0m 1.8050 146.746 M/S Jasim Construction, Thana Road, Charfassion, Bhola 146.746 30/04/2018 21/04/2019 0 31/12/2018  
9 MON/R-144 Improvement of Nazir Ahammed Road - Taltola Majher Ghat Bazar Road at CH- 00-1000.00m. (Effective Length- 1000.0m) Road ID: 509654036 Construction of 2 no (0.75m x 0.75m) RCC Box Culvert no Nazir Ahammed Road - Taltola Majher Ghat Bazar Road at CH- 30.0m & 913.0m 1.0000 88.114 M/S Bokshi Enterprise, Md.Arman Bokshi, Charfassion, Bhola 88.114 30/04/2018 21/04/2019 0 31/12/2018  
10 MON/R-143 Improvement of Sakuchia UP-Koralia GC Road at CH- 292-5000.00m. (Effective Length- 4523.0m) Road ID: 509653004 Construction of (0.75m x 0.75m) RCC Box Culvert no Sakuchia UP-Koralia GC Road at CH - 392.0m 4.5230 345.732 Md. Eunus Al Mamun, Thana Road, Charfassion, Bhola 345.732 30/04/2018 21/04/2019 60 31/12/2018 RCC
11 MON/R-142 Improvement of North Sakuchia UP office - Char Goalia - Batankhali Bazar road at CH- 2300-3383.00m. (Effective Length- 1016.0m) Road ID: 509653007 Construction of (0.75m x 0.75m) RCC Box Culvert no North Sakuchia UP office - Char Goalia - Batankhali Bazar road at CH- 3150.0m 1.0160 85.532 M/S Khan Traders, Charfassion, Bhola 85.532 30/04/2018 21/04/2019 30 31/12/2018 RCC
12 MO/R-21 Improvement of Latakhali - Banglabazar GC - Zakir Chairman Bari - East EMBK. Road at CH-1443-3650m Road ID- 509654025 ( 2270 m RCC Road) Construction of Palisading Work on Latakhali - Banglabazar GC - Zakir Chairman Bari - East EMBK. Road at CH-2860-3080m R/S Road ID- 509654025 (Total = 220m).Construction of 2 no (1x1.50x1.50m ) RCC Box Culvert on Latakhali - Banglabazar GC - Zakir Chairman Bari - East EMBK. Road at CH- 2045m & 2275m Road ID- 509654025Construction of (1x2.50x2.50m ) RCC Box Culvert on Latakhali - Banglabazar GC - Zakir Chairman Bari - East EMBK. Road at CH- 2585m Road ID- 509654025Construction of (2x3.50xm ) RCC Box Culvert on Latakhali - Banglabazar GC - Zakir Chairman Bari - East EMBK. Road at CH- 2045m & 2275m Road ID- 509654025 2.2700 173.576 M/S Bokshi Enterprise, Charfashion, Bhola. 173.576 12/07/2017 07/04/2018 100 31/12/2018 RCC Complete
13 MO/R-20 Improvement of Hazirhat UP. (Badher Hat) - Bhuiar Hat South Embankment Road at CH- 00-3960.0m Road ID-509653009 ( 3960m RCC Road) Construction of Palisading Work on Hazirhat UP. (Badher Hat) - Bhuiar Hat South Embankment Road at CH-295-304m L/S, 490-503m L/S, 700-730m L/S, 700-715m R/S. Road ID-509653009 (Total = 67.0m).Construction of 6 No (0.75x 0.75m) RCC Box Culvert on Hazirhat UP. (Badher Hat) - Bhuiar Hat South Embankment Road at CH- 700m, 875m, 1107m, 1175m, 1375m, & 1516m Road ID-509653009Construction of (2x3.50x4.00m) RCC Box Culvert on Hazirhat UP. (Badher Hat) - Bhuiar Hat South Embankment Road at CH- 295m Road ID-509653009 3.9600 279.722 Md. Unus All Mamun, Thana Road Charfashion, Bhola. 279.722 12/07/2017 07/04/2018 100 31/12/2018 Final bill payment
7 Tazumuddin
1 TAZ/STR-129 509912001-Construction of 18.00m Long Girder Bridge on RHD (Muchibari)- khaser hat GC-Mongolsikder GC (Tazumuddin-Part) Road at CH-9100.0m (ID No- 509912001) Earth Work on RHD (Muchibari)- khaser hat GC-Mongolsikder GC (Tazumuddin-Part) Road at CH-9100.0m 136.192 M/S Md. Shaha Alam, Muslim Para, Sadar, Bhola 136.192 25/01/2018 24/01/2019 90 31/12/2018 deck slab completed
2 TAZ/STR-128 Construction of 19.00m Long Girder Bridge on RHD (Muchibari)- Shibpur khaser hat GC-Munsir hat GC (Tazumuddin-Part) Road at CH-475.0m (ID No- 509912002) Earth Work on RHD (Muchibari)- Shibpur khaser hat GC-Munsir hat GC (Tazumuddin-Part) Road at CH-475.0m 102.871 Md. Eunus Al Mamun, Thana Road, Charfassion, Bhola 102.871 11/02/2018 20/02/2019 20 31/12/2018 Pile completed
3 TAZ/STR-127 Construction of 20.00m Long Girder Bridge on Chandpur UP (Shashoing Bazar) Chatta Dawari via Madrasha at CH- 1900.0m (ID No- 509913001) Earth Work on Chandpur UP (Shashoing Bazar) Chatta Dawari via Madrasha at CH- 1900.0m 112.309 Md. Iqbal Hossain, Rahima Villa, Poura Kathali Bhola Sadar Bhola. 112.309 20/03/2018 19/03/2019 20 31/12/2018 Pile completed
4 TAZ/R-66 Improvement of Eashinggonj Bazar to khyaghat Bridge via North koralmara RNGPS ID-509915017 0.5000 31.416 A.H Trading Corporation, 1209, Dhanmondi, Dhaka. 31.416 30/01/2018 29/07/2018 50 31/12/2018 WBM on going
5 TAZ/R-65 Improvement of Badlipur-Mirzakalu road at CH- 00-1100.0m (Length-1110m ) Road ID- 09915006Construction of Palisading Work on Badlipur-Mirzakalu road at CH- 145-162 L/S, 600-625 L/S 825-860LS, 875-900 LS, 975-995 LS, 1075-1095 LS, (Length-142.0m) Construction of 4 no (1.00x1.00m) RCC Box Culvert on Badlipur-Mirzakalu road at CH- 458m, 880m, 930m, & 1095m 1.1100 92.203 A.H Trading Corporation, 1209, Dhanmondi, Dhaka. 92.203 30/01/2018 29/10/2018 50 31/12/2018 WBM on going
6 TAZ/R-64 Improvement of Dakhin Shambopur-Bangla Bazar Road at CH- 00-1100.0m (Length-1100m) Raod ID-509915002 1.1000 88.839 M/S Nazrul Islam Cunnu, 8300, Bhola Sadar, Bhola 88.839 25/01/2018 24/01/2019 70 31/12/2018 WBM completed
7 TAZ/R-63 Improvement of Aralia Thakur Bazar to Kalasa Road at CH- 00-500.0m (Length-500m) Road ID- 509914011 0.5000 37.203 M/S Mokammal Enterprise, 8330, Lalmohon, Bhola. 37.203 31/01/2018 30/07/2018 70 31/12/2018 WBM completed
8 TAZ/R-62 Improvement of Chatto Dawri Bridge to Hatkhola bari Bridge road at CH- 00-500.0m (Length-500m) Road ID- 509915018 0.5000 47.613 M/S Bhuya Enterprise, Charfashion Bhola 47.613 20/11/2017 12/06/2018 100 31/12/2018 BC Completed
9 TAZ/R-61 Improvement of LGED Road (Kasem house) to Chairman bari via Nasir uddin bridge at Ch-800-1300.0m (Length-500m) Road ID- 509914017 0.5000 38.822 Serajia Enterprise, Westernpara, Laomohon , Bhola 38.822 23/11/2017 15/05/2018 100 31/12/2018 BC Completed
10 TAZ/R-60 Improvement of North Chanchra GPS-Ponar kandi Road at CH- 00-1000m (Length-1000m) Road ID-509915012 1.0000 68.367 Serajia Enterprise, Westernpara, Laomohon , Bhola 68.367 23/11/2017 15/08/2018 100 31/12/2018 BC Completed
11 TAZ/R-59 Improvement of South Shambopur GPS to Koralmara Adarsha Gram Road at Ch- 00-500.0m (Length-500m) Road ID-509915016 0.5000 36.197 M/S Nazimuddin Traders, Ward No-06, Mahajon Patti , Sadar Road Bhola 36.197 22/02/2018 14/08/2018 30 31/12/2018 STR
12 TAZ/R-36 Improvement of Chanchra Enbankment –Ponarkandi Road at CH- 00-1200m (BC Pavement. Length 1250m). Road ID-509915011 Construction of Palisading Work on Chanchra Enbankment –Ponarkandi Road at CH- 110-130m LS, 330-350m RS, 580-590m LS, 990-1010m RS. (Length 70 m). 1.2500 76.643 Serajia Enterprise, Westernpara, Laomohon , Bhola. 76.643 05/10/2017 27/06/2018 100 31/12/2018 BC Completed
13 TAZ/R-35 Improvement of Chanchra Enbankmant –Aralia road at CH- 00-1200m (BC Pavement. Length – 1250m). Road ID 509914005 1.2500 71.552 M/S Bhuya Enterprise, Charfashion, Bhola. 71.552 05/10/2017 27/06/2018 30 31/12/2018 Sub-Base On Going
14 TAZ/R-34 Improvement of Hazir hat –Lamchi Shambopur Road at CH- 1800-3050m (BC Pavement. Length – 1250m). Road ID 509915001 Construction of Palisading Work on Hazir hat –Lamchi Shambopur Road at CH- 1800-1810m LS, 1845-1850m LS, 1953-1980m LS, 1953-1970m RS, 2060-2067m, 2496-2506m, RS, 2500-2510m LS, 2545-2595m RS, 2968-2978m RS. (Length 1 46 m). Construction of 2no (1mx1m W- 5.500m) RCC Box Culvert on South Kaymullah –North Kaymullah Road at CH- 1805m, 2950m. Road ID 509915001 1.2500 94.134 M/S Bhuya Enterprise, Charfashion, Bhola 94.134 25/10/2017 17/07/2018 50 31/12/2018 Sub-Base Completed
15 TAZ/R-33 IImprovement of South Kaymullah –North Kaymullah Road at CH- 00-1200m (BC Pavement. Length – 1200m). Road ID 509915008Construction of Palisading Work on South Kaymullah –North Kaymullah Road at CH- 620-660m RS, 630-650m RS, 950-960m LS. (Length 70 m). Construction of (1mx1m W- 5.500m) RCC Box Culvert on South Kaymullah –North Kaymullah Road at CH- 660m 1.2000 80.714 M/S Bhuya Enterprise, Charfashion, Bhola. 80.714 05/10/2017 27/06/2018 70 31/12/2018 WBM Completed
16 TAZ/R-32 Improvement of Shibpur Khaser hat –Anada Bazar road at CH- 00-1200m (BC Pavement. Length – 1200m). Road ID 509914008 Construction of Palisading Work on Shibpur Khaser hat –Anada Bazar road at CH- 60-70m LS, 270-300m RS, 980-990m BS (Length 51 m). Construction of 3no (1mx1m W- 5.500m W-5.5m) RCC Box Culvert on Shibpur Khaser hat –Anada Bazar road at CH- 280m, 570m, & 937m. 1.2000 85.248 M/S Bhuya Enterprise, Charfashion, Bhola. 85.248 05/10/2017 27/06/2018 60 31/12/2018 WBM On Going
17 TAZ/R-31 Improvement of Shibpur Khasher hat- Mirzakalu road at CH- 330-1150m (BC Pavement. Length – 820m). Road ID 509914001 Construction of Palisading Work on Shibpur Khasher hat- Mirzakalu road at CH- 330-370m RS, 380-420m RS, 525-535m RS, 700-710m LS, 1075-1090m LS (Length 105 m). Construction of 3no (1mx1m W- 5.500m W-5.5m) RCC Box Culvert on Shibpur Khasher hat- Mirzakalu road at CH- 525m, 730m & 1045m. 0.8200 67.933 M/S Bhuya Enterprise, Charfashion, Bhola. 67.933 05/10/2017 21/08/2018 70 31/12/2018 WBM Completed
18 TAZ/R-22 Improvement of Pandith kandi Bridge to Badura bridge road at CH- 00-1000m (BC Pavement. Length – 1000m). Road ID 509914010 Construction of Palisading Work on Pandith kandi Bridge to Badura bridge road at CH- 70-94m 910-930m 930-980m (Length 94 m). Road ID 509914010 Construction of (1mx1m W- 3.70m) RCC Box Culvert on Pandith kandi Bridge to Badura bridge road at CH- 865m Road ID 509914010 1.0000 29.215 M/S Serajia Enterprise, Westernpara , Lalmohon, Bhola 29.215 09/07/2017 01/01/2018 100 31/12/2018 Final
19 TAZ/R-218 Improvement of Shibpur Khasher hat- Mirzakalu road at CH- 820-1123.0m Road ID 509914001 Construction of Palisading Work at CH- 13-30m (effective Length – 43.0m) on the same Road. 0.3300 21.645 M/S Podder Enterprise, Talluk, Hat Shashigonj, Tazimuddin, Bhola 21.645 0 31/12/2018  
20 TAZ/R-217 Improvement of Katakhali Bridge to Indranarayanpur RNGPS road at CH- 00-500.00m Road ID - 509915019 Construction of Palisading Work at CH- 200-260.0m on the same Road. Construction of (1.00x1.00) RCC Box Culvert at CH- 90.0m on the same road. 0.5000 37.985 M/S Shawdagor Traders, Kasherhat, Tazumuddin, Bhola 37.985 0 31/12/2018  
21 TAZ/R-13 A. Improvement of road from Charcha UP- Chachra Addrasho High School – Gosher hat Bazar road at CH- 00-1445.00m Road ID- 509913007 B. Construction of Palisading Work on Charcha UP- Chachra Addrasho High School – Gosher hat Bazar road at CH-60-80m L/S, 65-95m R/S, 910-920m L/S, 1410-1445m L/S (Length- 90m) C. Construction of 3 no’s (1.00x1.00m W-5.50m ) RCC Box Culvert on Charcha UP- Chachra Addrasho High School – Gosher hat Bazar road at CH- 120m, 740m, 1220m. Road ID- 509913007 1.4400 113.331 Iqbal Hossain, Bhola Sadar 113.331 27/06/2017 03/12/2018 50 31/12/2018 WBM ON GOING
22 TAZ/R-12 A. Improvement of Improvement of Thakur Bazar (UZR) to Anil Sadur Asram Bangla Bazar (UZR) road at CH- 2000-2500.00m. Road ID – 509914015 0.5000 36.161 Md. Mohshin Nagar, 1 No Woard, Bhola Sadar Bhola 36.161 02/07/2017 17/12/2017 100 31/12/2018 Final
23 TAZ/R-11 A. Improvement of Pandith kandi Bridge to Badura bridge at CH- 1000-1515.00m. Road ID – 509914010 B. Construction of Palisading Work on Pandith kandi Bridge to Badura bridge at CH-1018-1028m R/S, 1210-1240m R/S, 1222-1233m L/S, 1260-1273m R/S, 1265-1277m L/S, 1330-1360m R/S, 1383-1425m R/S, 1437-1452m R/S, 1500-1513m L/S, (Length-176m) Road ID – 509914010 C. Construction of 3 no’s (1.00x1.00m W-5.50m ) RCC Box Culvert on Pandith kandi Bridge to Badura bridge at CH- 1005m, 1383m, 1475m. Road ID – 509914010 0.5150 51.959 M/S Bhuya Enterprise, Charfashion Bhola 51.959 05/07/2017 20/03/2018 100 31/12/2018 BC Completed
24 TAZ/R-103 Improvement of Improvement of Kaymullah bridge-krishna mazumder Road at CH- 00m-1000m (Length- 1000.00m. Road ID- 509914006) Construction of Palisading Work on Kaymullah bridge-krishna mazumder Road at CH – 450-480 RS, 380-390RS, 250-270 RS, 120-135 RS, 60-80 RS, 600-620 RS, 680-700 LS, 850-875 RS, 880-900 LS (Length- 220m) 1.0000 76.946 M/S Nazimuddin Traders, 8300 Bhola Sadar Bhola. 76.946 14/02/2018 06/09/2018 30 31/12/2018 STR
25 TAZ/R-102 Improvement of Improvement of Chandpur UP (Shashigonj Bazar)- Chatta Dowari via madrasha Road at CH- 2200m-3900m (Length- 1700.00m. Road ID- 509913001) Construction of Palisading Work on Chandpur UP (Shashigonj Bazar)- Chatta Dowari via madrasha Road at CH - 2370-2400BS, 2433-2458 BS, 2800-2812 LS, 3550-3675 LS, 3780-3810 RS (Length- 277m) Construction of 3 no (1.50m x 1.50m) RCC Box Culvert on Chandpur UP (Shashigonj Bazar)- Chatta Dowari via madrasha Road at CH – 2350M, 2750M & 2946M 1.7000 139.796 M/S Mohshin Nagar, Bhola Sadar Bhola. 139.796 0 31/12/2018  
26 TAZ/R-10 A. Improvement of Uttar Aralia UZR Road to Aralia UZR via Matabbar kandi BC Road at CH- 00-500.00m. Road ID – 509914018 B. Construction of Palisading Work on Uttar Aralia UZR Road to Aralia UZR via Matabbar kandi BC Road at CH- 50-75m R/S, 130-150 L/S, 211-242m R/S, 320-340m R/S, 359-385m R/S, 400-419m R/S, 405-438 L/S, 490-501m L/S. Road ID – 509914018 (Length- 173) C. Construction of 1 no’s (1.00x1.00m W-5.50m) RCC Box Culvert on Uttar Aralia UZR Road to Aralia UZR via Matabbar kandi BC Road at CH- 300.00m Road ID - 509914018 0.5000 45.396 M/S Bhuya Enterprise, Charfashion Bhola 45.396 05/07/2017 20/12/2017 100 31/12/2018 BC Completed
27 TAZ/M-11 Maintenance of RHD Fulkuri-Shibpur khasherhat GCCR Road at CH- 00-1400m. Road ID 509914013Construction of Palisading Work on RHD Fulkuri-Shibpur khasherhat GCCR Road at CH- 445-460m L/S, 810-825m L/S, 1293-1308m R/S, 1312-1327m R/S, 1400-1414m L/S. (Length 74 m). Road ID 509914013Construction of 3 no (1mx1m W-5.50m) RCC Box Culvert on RHD Fulkuri-Shibpur khasherhat GCCR Road at CH-18.00m, 970.0m, 1125.0m. Road ID 509914013 1.4000 59.269 Md. Khair Hossain, 8200- Barishal Sadar, Barishal 59.269 09/07/2017 01/01/2018 100 31/12/2018 Final
Total : 464.0040 (Km) 2111013.42 (Lac) 2111013.42 (Lac)