Project Scheme Detail List
SL No. Package No. Name Length (Km) Allotment (Lac) Name of Contractor Contract Amount (Lac) Date of Commencement Date of Completion Physical Progress (%) Date of Progress Update Remarks
1 Bauphal
1 UIIP-BC/PCO/W-428 A) Improvement of Carpating Sarak From R&H road to Jommader Bari (Janata Sarak) Ch.0.00-2000.00m at ward No-03 under BauphalPaurashava. B) Construction of BC road from Muslimpara Poura Bhaban Front side to Fredom Fighter Wayadut Mia Sarak Via Basur Bari in ward No.-03 Under Bauphal Paurashava.Ch.0.00-1400.00m & With 02 Nos Box Culvert. C) Construction of RCC Culvert on Muslimpara BC Sarak front side of Dr. Ramij Uddin Bari in ward No.-05 under Bauphal Paurashava. D) Construction of RCC Box Culvert on Muslimpara Sarak Near Bot tola in ward No.-03 under Bauphal Paurashava. at Ch.80m. 3.4000 190.907 M/S SH Etnr. & Shupty Cons. 190.907 10/02/2021 09/02/2022 65 27/09/2022 9.54% Above
2 UIIP-BC/PCO/W-427 A) Construction of RCC Drain front side of master Monir Existing RCC Drain to East side of Haji Golam Mostofa House under BauphalPaurashava in ward No.-08. Ch.0.00-281.00m. B) Construction of Muslimpara RCC road from R&H Road to Pauro Bhabon at ward No.-03 under Bauphal Paurashava. Ch.0.00-492m. C) Construction of RCC road from Sher-E-Bangla Sarak to Chan Mia House at word No.-07 under Bauphal Paurashava. Ch.0.00-64.00m. 0.5560 147.224 M/S Arman Builders & Rupali Construction 147.224 03/02/2022 22/02/2023 40 27/09/2022 9.71% Above
3 UIIP-BC/PCO/W-274 (a). Construction of RCC Digital Sarak to Fakir Bari via A Razzak Fokir, Mulai Fakir, & Athar Gazi in ward-O9, under Bauphal Pauroshava, District: Patuakhali. Ch.000-219m (b). Construction of RCC Sarak Chairpara Existing RCC road to fredonm fighter AKM khalak mia house in ward -09, under Bauphal Pauroshava, District: Patuakhali. Ch.000-107m. (c). Construction of RCC Sarak Nazirpur Board School Sarak to Ponchiyed Bari in ward-08, under Bauphal Pauroshava, District: Patuakhali. Ch.000-275m. (d). Construction of RCC Sarak Nazirpur Board School to Mirda Bari in ward no-08 under Bauphal Pauroshava, District: Patuakhali. Ch.000-141m (e). Construction of RCC Sarak Kazi Nazrul lslam Saroni Baitul Hamed lame Mosque to Gopal Sill front side Existing RCC road (Sill Para Sarak) via Madop Mondol Bari in ward-03, under Bauphal Pauroshava, District: Patuakhali. Ch.000-348m 1.0900 127.595 M/S Deip Enterprise 127.595 12/04/2021 11/04/2022 100 27/09/2022 0.41% Less
4 UIIP-BC/PCO/W-273 (a). Construction of RCC Drain Girl School more to Kali Bari Existing Drain via Sakender pesker, Councilor Kabir, Jarnalist Shohag in ward No-04, under Bauphal Paurashava, District: Patuakhali. Ch.000-415m (b). Construction of RCC Drain & road R&H sarak to Santh Bag Md, Balayet Kanongo Back side Existing RCC Drain via Rngr. Jafor House in ward No07, under Eauphal Paurashava, District: Patuakhali. Ch.000-177m 121.847 M/S Roza & Saom Enterprise - M/S Sawda Enterprise (JV) 121.847 12/11/2021 12/04/2022 100 27/09/2022 0.58% Less
5 UIIP-BC/PCO/W-272 (a). Construction of BC Sarak Noni Mistary Bari to Md. yousuf Sarder Bari in ward-06, under Bauphal Paurashava, District: Patuakhali. Ch.000-580m (b). Construction of Hisbullah BC Sarak from yousuf Sarder Bari via Alom Sikder Bari more in ward-06, under Bauphal Paurashava, District: Patuakhali. Ch.000-314m (c). Construction of BC Sarak from Darun Sunna Sarak to front side of sikder Bari (Bakultala Sarak) in ward-o7, under Bauphal Paurashava, District: Patuakhali. Ch.000-520m (d). Construction of BC Sarak Dr, momin Sarak to 5ha-E-Bangla Sarak (Assai Sarak) in ward09, under Bauphal Paurashava, District: Patuakhali. Ch.000-488m. 1.9020 106.563 M/s Sh Enterprise & Shupty Construction (JB) 106.563 12/04/2021 11/04/2022 100 27/09/2022 1.08% Less
6 UIIP-BC/PCO/W-222 Construction of RCC Road & Drain from Romijuddin Sarak to Md. Mannan Khan House ward no.-03 under Bauphal Paurosava, District Patuakhali. Ch. 0.00-475m. 0.4570 105.214 Md. Jamal Hossain 105.214 19/12/2021 100 27/09/2022 1.50% Less
7 UIIP-BC/PCO/W-221 A) Contruction of Earth filling & HBB Sarak ward no.-01 Bangabandhu Sarak to ward no.-03 al Modina Jame Mosque via Abdus Samad Jame Mosque under Bauphal Paurosava, District-Patuakhali. Ch. 0.00-1067m. B) Contruction of RCC Road & Drain from Saha Para existing Drain to Paurosava Bhaban via Councilor Miss Rina Begum House in ward no.-03 under under Bauphal Pourosava, District-Patakhali. Ch.0.00-182m. C). Construction of RCC Culvert front side of Md. Zakir Surveyer House ward no.-03 under Bauphal Paurosava, District-Patuakhali 1.2490 109.721 Md. Abul Kalam Azad 109.721 30/05/2022 82 27/09/2022 1.08% Less Works under this Package are not completed till now due to negligence of the assigned Contractor
8 UIIP-BC/PCO/W-132 (A). Construction of RCC Drain Dr. Abul Kalam Farmacy front side of Bauphal khal in ward-04, under Bauphal Pauroshava, District: Patuakhali. ch.000-170m. (B). Construction of RCC Drain Md. Sultan Ahammad House to North side of Bauphal Khal via Abdul Khalek Police, Md. Sultan Gazi, Jebon Kormokar in ward-03, under Bauphal Paurosova, District: Patuakhali ch. 000-290 80.615 Md. Iqbal Hossain 80.615 07/09/2020 06/09/2021 100 27/09/2022 13.17% Less
9 UIIP-BC/PCO/W-131 (a) Contruction of Earth filling & HBB Sarak…… Ch.000-670m (b) Contruction of Earth filling & HBB Sarak…… Ch.000-396m 1.0660 83.097 M/S Arman Builders 83.097 14/12/2020 30/05/2022 100 27/09/2022 1.50% Less (Time Extended)
10 UIIP-BC/PCO/W-130 (a) Contruction of Earth filling & HBB Sarak…… Ch.000-518m (b) Contruction of Earth filling & HBB Sarak……… Ch.000-548m (c) Construction of RCC Sarak………. Ch.000-225m 1.2910 92.785 M/s Hasan Construction & Shupty Construction (JB) 92.785 14/12/2020 30/05/2022 100 27/09/2022 1.01% Less Land Problem for the Scheme No. (b) under this Package
2 Kalapara
1 UIIP-BC/PCO/W-528 A) Construction of Shed for Public Transport Passenger (28.00sqm) at ward No.01 Under Kalapara's Pourashava. B) Construction of One Storied Public Toilet (Type A=56.00sqm) at ward No.02 Under Kalapara's Pourashava. C) Construction of One Storied Vegetables & Agricultural Product Market of 5 Storied Foundation (Floor Area=314 sqm) at ward No.02 Under Kalapara's Pourashava. 198.831 ATC-KCD (JV) 198.831 13/07/2022 12/07/2023 0 27/09/2022 15.89% Less
2 UIIP-BC/PCO/W-455 A) Construction of RCC 01 ( one) Vent Box Culvert ( 5m x4m x3m) over Kalibari road west side near Yeasin mia House at ward no-01 under Kalapara's Pourashava. B) Construction of RCC 01 ( one) Vent Box Culvert ( 5m x4m x3m) over Nachnapara Khal near Suny Cottage at ward No.-01 under Kalapara's Pourashava. C) Construction of RCC 03 ( Three) Vent Box Culvert( 7.55m x3.70m x3m) over Natun Bazar Canal (Atimkhana) near Yosuf mia House at ward No-04 under Kalapara's Pourashava. D) Construction of RCC Box Culvert (7.8m x 1.5m x 2.4m) Over Chinguria road at ward No.-05 under Kalapara's Pourashava 89.803 M/S Rupali Construction 89.803 01/02/2022 30/01/2023 100 27/09/2022 15.77% Less
3 UIIP-BC/PCO/W-454 Construction of RCC drain Starting from Baitul Aman Jame Masjid via Nazrul Islam Sarak to Chinguria road at ward No.-04 under Kalapara's Pourashava.Ch.0.00 to 300m. 63.350 M/S Antora Trading co 63.350 01/02/2022 30/01/2023 10 27/09/2022 18.35% Less
4 UIIP-BC/PCO/W-453 Construction of Rigid Pavement from Chinguria via Pourashava Office to Rahmat Pur Road at ward no-04 & 05 under Kalapara's Pourashava. Ch.0.00m to 1500m. 1.5000 204.223 M/S Rupali Construction 204.223 07/02/2021 30/01/2023 100 27/09/2022 18.64% Less
5 UIIP-BC/PCO/W-271 (a)Construction of RCC Drain starting from Upazila Hospital via Ad, chunnu Mia house to Old Drain at ward no. 01 under Kalapara's Pourosava. Ch. 0+500m. (a)Construction of RCC Drain starting from Madrasa Roadvia Mofij Mia house to Naseria Senior Madrasa at ward no. 07 under Kalapara's Pourosava. Ch. 0+280m. 133.813 Md. Kamal Hossain 133.813 11/01/2021 09/01/2022 100 27/09/2022 13.37% Less
6 UIIP-BC/PCO/W-270 (a)Construction of RCC Drain starting from Kartik Babu house to Bollov Kormokar house at ward no. 05 under Kalapara's Pourosava. Ch. 0+250m. (b) Construction of RCC Drain starting from west side of Nur Mohammad Sharif house via Jahirul Islam house, Narayon Shill house to Rahmatpur Khal at ward no. 03 under Kalapara's Pourosava. Ch. 0+152m. (c)Construction of RCC Drain starting from Shamir Pal house to Nimai Sarker house at ward no. 06 under Kalapara's Pourosava. Ch. 0+100m. 91.701 Md. Kamal Hossain 91.701 11/01/2021 09/01/2022 100 27/09/2022 13.97% Less
7 UIIP-BC/PCO/W-269 (a) Improvement of road by Rigid Pavement starting from Ukil Patti road via Kacha Bazar to WAPDA road at ward no.-02 under Kalapara's Pourosava. Ch. 0+500m. (b) Construction of RCC Road starting from Razzak Khan house via Girls School to Kabi Nazrul Islam Road at ward no. 04 under Kalapara's Pourosava. Ch. 0+330m. 0.5000 109.844 Md. Kamal Hossain 109.844 11/01/2021 09/01/2022 100 27/09/2022 16.46% Less
8 UIIP-BC/PCO/W-268 (a) Construction of RCC Road starting from WAPDA Road to Dak Bangla at ward no.-02 under Kalapara's Pourosava. Ch. 0+150m (b) Improvement of road by RCC work from WAPDA Road via Hamid Munshi house to Kumar Patti road at ward no.-06 under Kalapara's Pourosava. Ch. 0+150m. (c) Improvement of road by RCC work from East side of Sukh ranjan house to Rakha Chandi Khola at ward no.-05 under Kalapara's Pourosava. Ch. 0+150m. (d) Improvement of road by RCC work in Golab Bagh road at ward no.-03 under Kalapara's Pourosava. Ch. 0+200m. (e) Construction of RCC Road starting from Kabi Nazrul Islam Road via Army Khalek Mia house to Razzak Miah House at ward no.-03 under Kalapara's Pourosava. Ch. 0+120m 0.7700 97.113 ATC_ NUR, Puran Bazar, Patuakhali 97.113 11/01/2021 09/01/2022 100 27/09/2022 16.59% Less
9 UIIP-BC/PCO/W-267 (a) (A) Implementation of Road by RCC work from WAODA road Boro Callbari via Kallbari Box Culvert to Fire Service road at ward no- 01 under Kalapara's Pourosava. Ch. 0+000 to 0+930m 0.9300 113.116 M/S Rupali Construction & Rup Store JV 113.116 11/01/2021 09/01/2022 100 27/09/2022 17.85% Less
10 UIIP-BC/PCO/W-94 (a) Improvement of RCC road starting from behind Girls school to Adom Ali Master house at ward No.-04 Under Kalapara's Pourashava. Ch. 0.00-230.00m (b) Improvement of RCC road starting from Kumar Potti road via Naya potti Oilmill Mosjid at ward No.-06 Under Kalapara's Pourashava. Ch. 0.00-240.00m. (c) Improvement of RCC road starting from Pizus Kanti house via Kishor Vender house to Kobi Nazrul Islam road at ward No.-03 Under Kalapara's Pourashava. Ch. 0.00-340.00m. (d) Construction of road by rigid pavement from Uttam Karmoker house via Akhrabari to Vojohori Kundo at ward No.-06 Under Kalapara's Pourashava. Ch. 0.00-320.00m. 1.1300 98.235 M/S Bokshi Enterprise 98.235 15/09/2020 20/09/2021 100 27/09/2022 10.61% Less
11 UIIP-BC/PCO/W-93 (a) Improvement of road by rigid pavement from Madrasha road via Altaf Mia house to Rafique mia house at ward No.-07 under Kalapara's Pourashava. Ch. 0.00 to 640.00m. (b) Improvement of road by rigid pavement starting from west side Nur-E Jame Masjed Nesaria Sarak to Sohel Mia house at ward No.-09 under Kalapara's Pourashava. Ch. 0.00 to 513.00m. 1.1530 146.810 M/S TM Enterprise 146.810 29/09/2020 28/09/2021 100 27/09/2022 14.19% Less
12 UIIP-BC/PCO/W-400 A) Construction of RCC Box Culvert (2x4.00mx3.00m) near at Taher Khan Jame Mosque in Asriaon Ward No. 04, Under Kalapara's/ Kuakata Pourashava. B) Construction of RCC Box Culvert (1x4.30mx3.00m) near at Mr.Kalam & Mr. Afjal house Side Nabinpur Khal in Word No-06, Under Kalapara's/ Kuakata Pourashava. 71.636 M/S Bakshi Enterprise 71.636 04/03/2021 05/03/2022 0 27/09/2022 15.44% Less
13 UIIP-BC/PCO/W-399 Construction of RCC Drain Work Starting from 03 no. Ward Main BC Road (LGED Rest House West Side) to Shohed Nurujjaman Sorok, (Via Elish Park), Under Kalapara's/ Kuakata Pourashava. (Ch-0+000-0+985.00m) 177.418 M/S Libati Traders & Rezwanul Masud (JV) 177.418 08/03/2022 07/03/2023 0 27/09/2022 20.30% Less
14 UIIP-BC/PCO/W-398 A) Construction of RCC Drain Work starting from 80 Ghare Area, Ward No.01, Under Kalapara's/ Kuakata Pourashava. (Ch:0+000-0+572.00m) 51.897 M/S Mayer Doya Enterprise 51.897 08/03/2022 07/03/2023 50 27/09/2022 16.02% Less
15 UIIP-BC/PCO/W-397 Construction of RCC Road Starting From 03 no. ward Main BC Road (LGED Rest House West Side) to Shohed Nurujjaman Sorok (Via Elish Park).Ward No-07, Under Kalapara's/ Kuakata Pourashava. (Ch.0+000-0+380m) 0.3800 104.093 Rezwanul Maksud 104.093 08/03/2022 07/03/2023 0 27/09/2022 15.58% less
16 UIIP-BC/PCO/W-396 Improvement of Earthen Road by the BC from the House of Jabber Chawdary’s Culvert to Wapda Very Bandth at ward No-01, Under Kalapara's/ Kuakata Pourashava. (Ch-1+300m-1+965m) 0.6650 114.184 M/S Delowar Hossain 114.184 08/03/2022 07/03/2023 15 27/09/2022 11.29% less
17 UIIP-BC/PCO/W-172 1. Improvement of Soling & Earthen Road by the BC from Monir Shorif house to Asrayan 03 Three Road More Ch.000m0730m730.00m at Ward No-03 Under Kalapara's/ Kuakata Pourashav Patuakhali. 2. Construction of 01 One Nos of 1-Vent RCC Box Culvart 2.00m x2.50m at Ch-390m Under Kalapara's/ Kuakata Pourashava Patuakhali 0.7300 137.305 M/S Palli Store 137.305 05/01/2021 17/03/2022 65 27/09/2022 4.50% Less Work delay because of material carrying problem
18 UIIP-BC/PCO/W-171 1.Improvement of Earthen Road by the BC from the house of Jabber Chawdarys Culvert to Wapda Very Bandth Ch.690m - Ch. 1300m = 610 m at Ward No -01 Under Kalapara's/ Kuakata Pourashava Patuakhali. 2.Construction of UIIP/BC/PCO/W-17201one Nos of 1-Vent RCC Box Culvart 1.50m x1.80mat Ch-1085.00m at Ward No -01 Under Kalapara's/ Kuakata Pourashava Patuakhali. 3. Construction of 01one Nos X-Drain 0.750x1.80m at Ch1147.00m Ward No -01 Under Kalapara's/ Kuakata Pourashava. 0.6100 124.654 M/S Palli Store 124.654 05/01/2021 17/03/2022 60 27/09/2022 11.58% Less Work delay because of material carrying problem
19 UIIP-BC/PCO/W-170 1 Improvement of Earthen Road by the BC from Rahman Kha Mosque To Culvert of Rustum Musully Ch.00 m-690m at Ward No-01 Under Kalapara's/ Kuakata Pourashava. Patuakhali. 2. Construction of 01one Nos of 1-Vent RCC Box Culvart 1.50m x1.80m at Ch- 690m at Ward No -01 Under Kalapara's/ Kuakata Pourashava Patuakhali 0.6900 125.730 M/S Palli Store 125.730 05/01/2021 17/03/2022 50 27/09/2022 11.29% Less Work delay because of material carrying problem
20 UIIP-BC/PCO/W-19 1) Improvement of Earthen Road by the BC from Panju Para More To End of Pourashava Area Ch. 2+000m-2+760m = 760m at Ward No-08. Under Kalapara's/ Kuakata Pourashava.Patuakhali. 2) Construction of 01 One No of 1-Vent RCC Box Culvert 1.50mx1.80m Ch.2+00m-2+300m at Ward No-08 Under Kalapara's/ Kuakata Pourashava Patuakhali 0.7600 148.311 M/S Mamun Construction 148.311 07/10/2020 17/12/2021 100 27/09/2022 11.28% Less Final bill to be submitted
21 UIIP-BC/PCO/W-18 Improvement of Soling & Earthen Road by the BC from Toyeb Member house to Mahabub Talukder Sarak Ch.0+00m0+520m = 520.00m at Ward No-08 Under Kalapara's/ Kuakata Pourashava Patuakhali. (Salvage Cost Tk.103664.00) 0.5200 85.800 M/S Palli Store 85.800 07/10/2020 07/12/2021 65 27/09/2022 2.71% Less Progress is less due to negligence of the assigned Contractor
3 Patuakhali-s
1 UIIP-BC/PCO/W-450 Construction of RCC Drain with footpath at Sabujbag main road from Govt. College Gate-2 to Boy's Hostel with top slab of existing drain in ward No.-04 of Patuakhali Pourashava. (Ch:0.00-500.00m) 191.445 M/S Jakaullah & Brothers-M/S Ayan Entr. 191.445 28/02/2022 22/02/2023 65 27/09/2022 7.79% Above
2 UIIP-BC/PCO/W-220 1) Improvement of Road at Middle Kolatola Sarok Maik Gazi house to Poura BC road (Via Aziz gazi house), ch 0.00-780.0m, Word No-09, Under Patuakhali Pourashava. 2) Construction of 1 Nos Nox Culvert at Middle Kolatola Sarok Manik gazi house to Poura BC road (Via Aziz gazi house), ch 0.00-330.0m, Word No-09, Under Patuakhali Pourashava. 3) Construction of 2 nos Cross Drain (1.00x1.25x10m) at Middle Kolatola Sarok Maik Gazi house to Poura BC road (Via Aziz gazi house), ch 0.00-780.0m, Word No-09, Under Patuakhali Pourashava. 4) Construction of 5 nos 450m Dia UPVC Pipe wit Inlet Pit at Middle Kolatola Sarok Maik Gazi house to Poura BC road (Via Aziz gazi house), ch 0.00-780.0m, Word No-09, Under Patuakhali Pourashava. 0.7800 135.010 Md. Mizanur Alam 135.010 03/01/2021 01/03/2022 85 27/09/2022 8.44% Above Progress is slow due to negligence of the assigned Contractor
3 UIIP-BC/PCO/W-219 1 Improvement of Road at Puran Feery Ghat Main Road to South Side Mirzagong Main Road Muktizodda SarokCh 0.00-760.0 m Under Patuakhali Pourashava 0.7600 108.552 Md. Mizanur Alam 108.552 03/01/2021 28/02/2022 100 27/09/2022 4.41% Above
4 UIIP-BC/PCO/W-218 1. Improvement of Road at Nondokanai- Mirzagong Main Road to North Side Akusha Sarok ( Ch0.00-435.0m) in Ward No-09 Under Patuakhali Pourashava. 0.4400 78.055 Md. Mizanur Alam 78.055 03/01/2021 28/02/2022 100 27/09/2022 8.34% Above (Revise Done)
5 UIIP-BC/PCO/W-112 1 Improvement of Road at Chowrasta Mirzagong Sarak Mosque to South Side Polli Bidut Main Highway Ch 0.00-660.0m Under Patuakhali Pourashava.2 Construction of 5 nos Cross Drain 1.00x1.25x8m on Rigid Pavement at Chowrasta Mirzagong Sarak Mosque to South Side Polli Bidut Main Highway Under Patuakhali Pourashava. 0.6600 190.173 Md. Mizanur Alam 190.173 07/12/2021 60 27/09/2022 4.85% Above (Revise Done) Work delay due to Recast
6 UIIP-BC/PCO/W-111 1 Improvement of Road at Town Kalikapur Amtoly Main Sarok to West Side Gudigata Sarok Via 93 no Govt. Primary School Ch 0.00-450.0 m WordNo-09 Under Patuakhali Pourashava. 2 Improvement of Road at Town Kalikapur 93 no Govt. Primary School to North Side Md. Abu bakor Munci Goni Munci and Ali Munci house Ch0.00-350.0mWord No-09 Under Patuakhali Pourashava. 3 Construction of 5 nos 450m Dia UPVC Pipe wit Inlet Pit at Town Kalikapur 93 no Govt. Primary School to North Side Md. Abu bakor Munci Goni Munci and Ali Munci house Ch0.00-350.0mWord No-09 Under Patuakhali Pourashava. 0.8000 145.739 M/S Kohinoor Enterprise 145.739 07/04/2020 06/04/2020 97 27/09/2022 4.75% Above (Revise Done)
Total : 24.7890 (Km) 4502.41 (Lac) 4502.41 (Lac)