Project Scheme Detail List
SL No. Package No. Name Length (Km) Allotment (Lac) Name of Contractor Contract Amount (Lac) Date of Commencement Date of Completion Physical Progress (%) Date of Progress Update Remarks
1 Chouddagram
1 UIIP/PCO/G-44 Implementation & Supply 781 nos Waste Basket (120 ltr) & 9 nos Non-motorized vehicle (van) under Chouddagram Pourashava District: Cumilla. 39.960 RFL Plastrics Limited 39.960 11/02/2024 10/02/2025 20 14/10/2024
2 UIIP-BC/PCO/W-573 (A) Improvement of RCC Road work at Dhaka Chittagong Highway to West Bypass Tower West Corner ( Ch.00-375.00m) Link Judge Kaushik Khandikar & Azad Home ( Ch. 00-100.00+00-40)=140.00m Ward no-06. Under Chouddagram PourashavaCumilla (B) Improvement of RCC Road & RCC Retaining wall at Falgunkora Bhuiyan Jame Mosque Road to H/O Mafigur Rahman Councilor ( Ch.00-199.00m) Ward no-06. Under Chouddagram PourashavaCumilla (C) Improvement of RCC Road at Ramchandrapur Siddikur Rahman Shop to Dhaka Chittagong Highway Deputy Tax Calculator Office( Ch.00-510.00m) With on Cross Drain at (Ch. 00-m) Ward no-08 & 09 Under Chouddagram PourashavaCumilla (D) Improvement of RCC Road Baiderkhil Jame Mosque Road to H/O Mahabudul Haque ( Ch.00-95.00m) Ward no-07. Under Chouddagram PourashavaCumilla 1.3190 196.910 Aristocratic Construction Firm 196.910 11/06/2023 10/06/2024 68 14/10/2024
3 UIIP-BC/PCO/W-511 A) Rehabilitation of RCC Road from Chouddagram Highway Connecting Road in front of Girls School Including Foothpath under Chouddagram PourashavaCumilla (Ch.0.00-25.00m) B) Construction of Top Slab of Drain at Chandishkara Laksham Road to South side Gazi Bari Road under Chouddagram Pourashava Cumilla (Ch.00-125.00m) C) Construction of RCC Box Culvert (4.00x3.00m) at Chandishkar on Shorpolona Canel Nearest H/O Journalist Mahbobur Rahman Miazil under Chouddagram PourashavaCumilla. (dropped) D) Construction of RCC Box Culvert (4.00x3.00m ) at on Kisnochora Canel at Falgunkara West-South side H/O Mano Masterl under Chouddagram PourashavaCumilla. E) Construction of RCC Box Culvert (4.00x4.00m) at Highwayl Connecting Road in front of Girls School at Ch.15.00m Under Chouddagram PourashavaCumilla. 0.2500 109.329 M/S Patwary Enterprise 109.329 21/08/2022 27/05/2024 46 14/10/2024
4 UIIP-BC/PCO/W-510 A) Construction of RCC Road at Chondipur Bypass Road to Graveyard under Chouddagram PourashavaCumilla (Ch.0.00-275.00m)B) Construction of RCC Road at Laxmipur Jame Mosque Road to Ramrygram H/O NSI Kazi Kamal under Chouddagram Pourashava Cumilla (Ch.0.00-295.00m)C) Construction of Protection wall at Laxmipur Jame Mosque Road to Ramrygram H/O NSI Kamal under Chouddagram PourashavaCumilla (Ch.0.00-295.00m) D) Construction of RCC Road at Jayantinagar BC Road to H/O CEO shab under Chouddagram Pourashava Cumilla (Ch. 0.00-130.00m)E) Construction of RCC Drain at Jayantinagar BC Road to H/O CEO shab under Chouddagram Pourashava Cumilla (Ch. 0.00-130.00m)F) Construction of RCC Drain at Laximipur Eidga to H/O khalill Miha under Chouddagram Pourashava Cumilla (Ch.0.00-107.00m)G) Construction of RCC Box Culvert (2.00x2.00m) at Joyantynagar GPS Road Nearest Highway at Ch.10.00m under Chouddagram Pourashava Cumilla. 0.9950 113.226 M/s Patwary Enterprise 113.226 11/07/2022 10/07/2023 97 14/10/2024
5 UIIP-BC/PCO/W-509 A) Constraction of RCC Road at Pachra Monshibari road under Chouddagram PourashavaCumilla (Ch.0.00-305.00m) B) Construction of Retaining wall at Pachra Monshibari Road under Chouddagram Pourashava(Ch.230.00- 300=70.00m))C) Construction of RCC Road at Natapara(East) H/O Kala Mia to Hoddar Pond under Chouddagram PourashavaCumilla (Ch.0.00-242.00m)D) Construction of RCC Road at Chandishkara Laksham Road to North Side of H/O Hazi Yousuf & Md. Ismail under Chouddagram Pourashava Cumilla (Ch.0.00-165.00m)E) Construction of RCC Drain at King Sreeour Kacha Bazer to Asho shah Fakir Mazer under Chouddagram PourashavaCumilla (Ch.0.00-263.00m)F) Construction of RCC Drain at Falgunkhara H/O Arob Mulla to North Side Canal under Chouddagram Pourashava Cumilla (Ch.508.00-577.00m=69.00m 0.7820 142.176 M/s Rafiq Traders 142.176 11/07/2012 10/07/2023 52 14/10/2024
6 UIIP-BC/PCO/W-264 (A)(ROAD -BC) Rehabilitation of Road by BC of Chouddagram H.J gov.High School Main Road Under Chouddagram Pourashava,Comilla.( Ch.00-150.00m)( B) ( Retaining wall ) Rehabilitation of Chouddagram H.J Gov.High School Main Road Under Chouddagram Pourashava,Comilla.( Ch.00-150.00m)( c) Construction of RCC Drain at H.J High School Road Side Under Chouddagram Pourashava,Comilla.( Ch.00-130.00m)( D) Construction of RCC Main Drain from H.J Gov.High School Play Ground to South Side Shorpolona Canel Under Chouddagram Pourashava,Comilla.( Ch.00-25.00m)( D) Construction of RCC Main Drain from H.J Gov.High School Play Ground to South Side Shorpolona Canel Under Chouddagram Pourashava,Comilla.( Ch.00-25.00m)( E) (Road-RCC)Construction of RCC Road at Chouddagram H.J Gov.High School Road Under Chouddagram Pourashava,Comilla.( Ch.00-520.00m) 0.8200 149.313 M/S. Tuhin Brothers 149.313 25/07/2021 30/06/2022 100 14/10/2024
7 UIIP-BC/PCO/W-263 (1) (ROAD) Improvement of a Road at Panchr House of Kader Mmember to House of Saiful Counselor under Chouddagram Pourashava,Cumilla (Ch.235.500m)(1) (CROSS DRAIN) Improvement of a Road at Panchr House of Kader Mmember to House of Saiful Counselor under Chouddagram Pourashava,Cumilla (Ch.235.500m)(3) (ROAD) Constructionof RCC Road for Chouddagram Upazila Porishod Under Chouddagram Pourashava,Cumilla.( Ch.00-80.00m)( 4) ( Rataining Wall) Construction of RCC Retaining wall at nearest in front of Chouddagaram Upazila Porishod Road Side Under Chouddagram Pourashava ,Cumilla( Ch.0.00-80.00m)( 5) ROAD-BC) Improvement of a Road From Dhaka-Chittagong Highway to Falgunkara Chowdhury Bari Road under Chouddagram Pourashava,Cumilla( Ch.00-510.00m)( 6) ( Road-R.C.C) Construction of R.C.C Road at South Falgunkara Road to house of Chowdhury Bari under Chouddagaram Pourashava,Cumilla( ch.00-96.00m)(7) Construction of RCC road at Chandishkara Laksum Road to Towards north side house of Shekh of Abdur Rahman under Chouddagram Pourashava Cumilla (Ch: 00-262.00m 1.2630 109.721 M/S. Tuhin Brothers 109.721 04/10/2021 08/05/2022 100 14/10/2024
8 UIIP-BC/PCO/W-265 ( A) Construction of RCC Drain at King Sreepur High School Road from house of Abdul Mannan to west side Culvert Under Chouddagram Pourashava,Comilla.( Ch.694-904.00m)( B) Construction of RCC Road at Sreepur West Bypass Road to West Side House of Chan Miah Under Chouddagram Pourashava,Comilla.( Ch.00-320.00m)( c) Construction of RCC Drain at Sreepur West Bypass Road to West Side House of Chan Miah & Jamal Under Chouddagram Pourashava,Comilla.( Ch.30-230.00m)( D) Improvement of West Dhonmuri Road to House of Advocat Shiraz Nearest Chatitola Road at Sreepur West Bypass Road to West Side House of Chan Miah Under Chouddagram Pourashava,Comilla.( Ch.00-300.00m) 100.491 M/S. Tuhin Brothers 100.491 25/07/2021 30/06/2022 100 27/09/2022 7.12% Less (Work in Progress may be compieted within this Month (August 2022))
9 UIIP-BC/PCO/W-82 (A)B1-( Drain) Construction of R.C.C Drain From Baidderkhi house of Habu Miah to North Side Canel under Chouddagram Pourashava,Cumilla. ( Ch.0.00-280.00 M )( B) C1-(Road -BC) Improvement of a Road from Dhaka-Chittagong Highway to East Dhonmuri BC Road under Chouddagram Pourashava,Cumilla. ( Ch.600-1310.00m)(C) E1-Construction of 2.00m x 2.00m RCC Box Culvert at Pachra Balujuri Road under Chouddagram Pourashava,Cumilla. ( Ch.1050.00M) ( D) E2-Contruction of 2.00m x 2.00 m RCC Box Culvert at Pachra Nearest House of Shamsu Bsc under Chouddagram Pourashava,Cumilla. ( Ch.750.0 M) 0.7100 81.056 M/S. Kamrul Enterprise 81.056 05/10/2020 05/10/2021 100 27/09/2022 2.86% Above (Final Bill done)
10 UIIP-BC/PCO/W-81 (A) A-1( Road) Construction of R.C.C Road at Chandishkara Laksum Road to Towards north West side house of Mizan Moulana under Chouddagram Pourashava,Cumilla . ( Ch.00-270.00 m) ( B).A2-(Retaining wall) Construction of Retaining wall Road Side at Chandishkara Laksum Road to Towards north West side of Mizan Moulana under Chouddagram Pourashava,Cumilla. ( Ch.200-234=34.00 m) ( B).A2-(Retaining wall) Construction of Retaining wall Road Side at Chandishkara Laksum Road to Towards north West side of Mizan Moulana under Chouddagram Pourashava,Cumilla. ( Ch.200-234=34.00 m)(C ) B1-( Road) Construction of R.C.C Road at Chandishkara Shiraz Patowary Bari RCC Road to South side New Mosque Nearest house of Ali Hossain under Chouddagram Pourashava,Cumilla ( Ch.0.00-300.00m)( D) B2-(Drain-1) Construction of Drain at Chandishkara Shiraz Patwory Bari R.C.C Road to south side New Mosque Nearest house of Ali Hossain under Chouddagram Pourashava,Cumilla. ( Ch.0.00-128.00m)( E) B3-(Drain-2) Construction of Drain at Chandishkara Shiraz Patwary Bari RCC Road to south side New Mosque Nearest house of Ali Hossain under Chouddagram Pourashava,Cumilla. ( Ch.0.00-45.00m) ( G) A2- ( Drain)Construction of Drain at Noapara East bypass Road to house of Driver Ali Hossain underChouddagram Pourashava,Cumilla. ( Ch.00-254.00m)( H) B1-( Road) Construction of HBB Road at Highway Side from Ramchandrapur BICIS Road to South Side Shop of Nurul Amin under Chouddagram Pourashava,Cumilla. ( Ch.2320.00-2950.00m) ( I) B2-Construction of 4.00m x3.00m RCC Box Culvert in on Mitalla Cannel under Chouddagram Pourashava,Cumilla ( Ch.2550.00 m) 1.4840 182.726 M/S.Hoque Traders 182.726 05/10/2020 05/10/2021 100 27/09/2022 0.28% Less (Final Bill done)
2 Homna
1 UIIP/PCO/G-45 Implementation & Supply 765 nos Waste Basket (120 ltr) & 10 nos Non-motorized vehicle (van) under Homna Pourashava District: Cumilla. 39.970 RFL Plastrics Limited 39.970 15/01/2024 17/04/2024 95 14/10/2024
2 UIIP-BC/PCO/W-630 Construction Of single Storied Vegetables and Agricultural products Market on 5 storied Foundation At Homna Pourashava,Cumilla.(Floor Area=314 sqm) 99.560 M/S Shahid Traders 99.560 31/07/2023 30/07/2024 76 14/10/2024
3 UIIP-BC/PCO/W-576 Improvement of BC road from starting from Srimoddi Bazar Mosjid moar to Latia road Anu Miahbari existing RCC road (Ch.00-795.00m) under Homna Pourasha,Cumilla. 0.7950 32.980 M/S Modina Construction 32.980 23/05/2023 22/05/2024 50 14/10/2024
4 UIIP-BC/PCO/W-420 Rehabilitation of BC Road by RCC Road starting from Homna Old Bus Stand Over Bridge to East Srimoddi Eidgah in ward No-05 & 06 under Homna Pourashava (Ch.820-2000m). 1.1800 152.478 M/S Modina Construction 152.478 07/07/2022 06/07/2023 100 14/10/2024
5 UIIP-BC/PCO/W-497 A) Construction of RCC Road starting from Bagmara-Kalmina Road to Graveyard existing pacca Road (Ch.0.00-155m) ward No.09 under Homna Pourashava. B) Construction of RCC Drain starting from REB Mosjid Road Hazrat Ali Bari moar to REB Office existing Drain (Ch.0.00-180m) ward No.04 under Homna Pourashava.C) Construction of 03 (Three) No. Box Culvert ( Size:3.0m x 3.5m x 6.20m) from Bus Stand to Latia Road at Chainage 650m 1600 & 2750m) Under under Homna Pourashava. 0.1550 138.972 MAM Construction Ltd. 138.972 06/05/2022 06/04/2023 80 14/10/2024
6 UIIP-BC/PCO/W-421 Construction of RCC Road starting from Bagmara Madrasha to Homna-Kashipur Road in ward No-02 under Homna Pourashava (Ch.0.00-850m). 0.8500 96.182 M/S. Lockman Hossain 96.182 06/05/2022 06/04/2023 100 14/10/2024
7 UIIP-BC/PCO/W-229 Construction of RCC Road starting from A) Homna Post Office Mour to Old Bus Stand Bridge approach via Homna Bazar ( Ch.00-712m). B) A 1 Rashid Plaza corner to Homna Thana Gate in ward no 04 & 05 under Homna Pourashava ( ch.00-48m) 0.7600 153.234 M/S. Zaman Traders 153.234 22/06/2021 21/12/2021 100 14/10/2024
8 UIIP-BC/PCO/W-74 ( a)Rehabilitation & Widening of BC road starting from Homna Post Office moar to Raj gat in ward No-04 ( Ch.00-700m) ( b) Construction of RCC Road starting from Rehana Mojid Mohila Collage to Motin Shop via Mostafa bari Graveyard in Ward No-03 & 04 ( Ch.00-470) ( c) Rehabilitation of BC Road starting from Homna Adrashapara Ghatla to Homna-Kashipur road in ward No-03 ( Ch. 800-1+820m) 2.1700 152.934 M/S Modina Construction 152.934 09/11/2020 25/05/2022 100 14/10/2024
9 UIIP-BC/PCO/W-230 (a)Construction of RCC Drain starting from Homna Degree College Bridge East Side to Titas River via BRDB Godown ( L-410.00 m) under Homna Pourashava & Link Goal Bari Bridge ( L-108.00 m) in ward No-05, under Homna Pourashava. ( b)Construction of RCC Drain Starting from Bagmara Bazer to Alipur Canal via Bagmara Madrasha ( L-705.00 m) in ward No-02 ,under Homna Pourashava. ( c) Construction of RCC Drain Starting from Homna Sadar from Homna Sadar Hospital Gate to Post Office moar existing drain ( L-170.00 m) in ward No-04, under Homna Pourashava. 210.834 M/S. Zaman Traders 210.834 22/06/2021 21/12/2021 100 27/09/2022 5.10% Less (Land dispute problem, but now Work in Progress may be compieted within this Month (Septembar 2022)
10 UIIP-BC/PCO/W-75 (a)Construction of RCC Road starting from Pourashava Office road to Existing Horipur via Homna Kanda Eidgah in ward No-03( Ch.00.00-891.00m) ( b) Rehabilitation of BC Road starting from Homna East Srimoddi Eidgag to Srimoddi Lanchgat in ward No-06,07 & 08( Ch.2+000-4+550 m). 2.8910 147.573 MAM Construction Ltd. 147.573 10/08/2020 09/08/2021 100 27/09/2022 3.01% Less (Final bill done)
3 Nangalkot
1 UIIP/PCO/G-46 Implementation & Supply 765 nos Waste Basket (120 ltr) & 10 nos Non-motorized vehicle (van) under Nangolkot Pourashava District: Cumilla. 39.970 RFL Plastrics Limited 39.970 10/03/2024 09/06/2024 60 15/10/2024
2 UIIP-BC/PCO/BCO/W-546 (A) Construction of One Storied Vegetable & Agricultural Product Market (Floor Area=145.00 sqm) under Nangalkot Bazar (B) Construction of One Storied Public Toilet Building (Type A=56 sqm) Under Nangalkot Bazar (C) Construction of Shed For Public Transport Passenger (28.00 sqm) Nangalkot Bus Stant 115.356 MMC-MST (JV) 115.356 07/06/2023 06/06/2024 51 15/10/2024
3 UIIP-BC/PCO/BCO/W-513 Construction of RCC drain front of Nangalkot Poura Bhaban (Ch.0.00-875.00m) under Nangalkot Pourashava Cumilla. 119.017 M/S Modina Construction 119.017 31/07/2022 30/07/2023 77 15/10/2024
4 UIIP-BC/PCO/BCO/W-499 Improvement of road from Mahini and Bazar Road to Anwar Kausar AC Land office Teacher Training Center Road (Ch.00-481.00m) by RCC under Nangalkot Pourashava. 0.4810 63.566 M/S Shalaha Traders 63.566 07/01/1900 30/06/2023 85 15/10/2024
5 UIIP-BC/PCO/BCO/W-498 Improvement of road from bypass road to Rail Station road & Police Station via B.B Chattar (Ch.00-470.00m) under Nangalkot Pourashava. 0.4700 118.482 M/S Azam & Saiham Traders 118.482 01/07/2022 30/06/2023 100 14/10/2024
6 UIIP-BC/PCO/BCO/W-512 A)    Construction of RCC drain beside Nangalkot to Dhalua Road (Ch.0.00-627.00m) under Nangalkot Pourashava Cumilla.B)    Construction of RCC drain beside Sreekamta Pucca Road (Ch.0.00-51.00m) under Nangalkot Pourashava Cumilla. 95.880 M/S Modina Construction 95.880 31/07/2022 30/07/2023 0 27/09/2022 9.940 % Above
7 UIIP-BC/PCO/BCO/W-190 Improvement of Road from Betagaon-Atakora Road to Sreehashya road (Ch. 0.00-1+490Km) under Nangolkot Pourosava. 1.4900 142.747 M/S Nur Ayesha Traders 142.747 23/01/2021 100 27/09/2022 0.02% Less
8 UIIP-BC/PCO/BCO/W-189 1. Improvement of Road from Dayemchati Bazar to Ludua Road (Ch. 0.000-0+790m) by BC under Nangalkot Porosava2. Construction of X Drain 6.00mx 1.00x1.00m on Dayemchati bazar to Ludia road3. Construction of 1x3.0x3.0m RCC Culkvert on Asawdia road (road way 5.00m) 0.7900 77.554 M/S Modina Construction 77.554 19/01/2021 100 27/09/2022 0.02% Less
9 UIIP-BC/PCO/BCO/W-188 Improvement of Road from Sreekamta pucca road to Poura boundary via Lucky's house (Ch. 0.11-0.900m) under Nangalkot Porosava 0.9000 118.275 M/S Saidul Enterprise 118.275 24/01/2021 23/01/2022 100 27/09/2022 0.05% Less
10 UIIP-BC/PCO/W-57 Improvement of road at Bot tola (Laksam rd. Mahin rd. Sreefolia rd. & Hospital road) (L-635.00m) by RCC 0.6400 270.407 MMC-MST (JV) Nagalkot Bazar 270.407 10/04/2020 30/09/2021 100 27/09/2022 0.01% Above
Total : 21.1950 (Km) 3610.88 (Lac) 3610.88 (Lac)