SL No.
|
Package No.
|
Name
|
Length (Km)
|
Allotment (Lac)
|
Name of Contractor
|
Contract Amount (Lac)
|
Date of Commencement
|
Date of Completion
|
Physical Progress (%)
|
Date of Progress Update
|
Remarks
|
1
|
Gopalganj-s
|
1
|
UIIP-PCO/BCO/W-602
|
(A) Improvement of Karalgati Horimondir Road by RCC Starting from Police Line to Rail Line Bridge, Ward No. 01, under Gopalganj Pourashava, (Ch.00-1066.00m), (Salvage Amount=13,00,968.00).
(B) Improvement of RCC road starting from Nripen house to Babu house (Ch.00-43.00m), Faringabari bylane to Mithun house, (Ch.00-45.00m) & Hazzaj house to Land of Rony, (Ch.00-37.00m), Ward No. 04, under Gopalganj Pourashava.
(C) 1. Improvement of RCC at Miapara Koborsthan bylane starting from Harun Manager to H/O Monir Molla (Ch.00-309.00m), Link H/O Humayun Kabir to H/O Tara Munshi (Ch.00-133.00m), 2.Munshi bari bylane near Fireservice road starting from H/O Johur Sadar to H/O Bacchu Sardar (Ch.00-58.00m), Ward No. 05, under Gopalganj Pourashava.
(D) Improvement of RCC road starting from Miapara Rokonuddin road to H/O Asrafu, (Ch.00-137.00m), Ward No. 05, under Gopalganj Pourashava.
(E) Improvement of RCC road at Shabujbag road bylane starting from H/O Murtoja to Lipa via H/O Rousan (Ch.00-60.00m), Ward No. 10, under Gopalganj Pourashava.
|
1.8880
|
252.518
|
M/S Lalin Traders
|
252.518
|
30/04/2024
|
29/04/2024
|
21
|
03/11/2024
|
|
2
|
UIIP/PCO/G-55
|
Implementation & Supply 194 nos Waste Basket (120 ltr) & 45 nos Non-motorized vehicle (van) under Gopalganj Pourashava, District: Gopalganj.
|
|
39.956
|
RFL Plastics Limited
|
39.956
|
|
|
0
|
03/11/2024
|
|
3
|
UIIP-PCO/BCO/W-600
|
1.Improvement of RCC Road at Taghuria starting from Mahagobindo House to Mini House, L-54.00m, Ward No.11.
2. Improvement of RCC Drain at Nabinbag starting from Nabinbag road Tipu Sultan House to Techcnical School South-East Side, L-147.00m Ward No.12.
3. Improvement of RCC Road at Upazala starting from Chapail Road Liaquat Ali House to Modhumati Lack, L=190.00m, Ward No-13.
4. (a) Improvement of RCC Road at Chair Pathali starting from Liaquat House to Box Culvert, L-33.00m (b) Improvement of RCC Road & Drain Mandartola Starting from Mandartola RHD Bridge to AKM Molla House, L-53.00m, Ward No.14
5. Improvement of RCC Road at Chair Pathali Jame Mosque Road Starting from Dhaka-Khulna Road to Nearable Milu Mia House, L=121.00m Ward No.15 (Salvage=42,269.00)
|
0.4510
|
100.620
|
M/S. Kamrul & Brothers
|
100.620
|
22/10/2023
|
18/10/2024
|
100
|
03/11/2024
|
|
4
|
UIIP-PCO/BCO/W-599
|
1. Improvemen work at Masterpara starting from Liton house to Jahid House by RCC Length=202.00m Ward No.01. (Salvage=65,372.00)
2. Improvemen work at Mouloipara from Banani Apa house to Mazed Molla house by RCC road and Drain, Length=150.00m, Ward No.02. (Salvage=25,948.00)
3. Improvemen work at Bedgram from Bypass to Hitu Sheikh house and from Nuru Molla house to Sajol molla house by RCC Road, Length=70.00m+70.00m, total length=140.00m, ward no.03.
4. Improvemen of Road from H/O Hobi Sarder to H/O Anirul by RCC at Miapara, Word No:05 (Ch0.00-90.00m) (Salvage=20,429.00)
5. Improvement of Himangon Road from Habibur Rahman’s (Fatema Monjil) to Humayun Kabir’s House by RCC Ward No.07 Under Gopalganj Pourashava (Ch.0.00-170.00m)
6. Improvement of Khan Saheb BC Road from Pikul’s House to H/O Khan Shaheb with 42m RCC Drain and 301m BC Road at Ward No:10 Gopalganj Pourashava
|
1.0530
|
131.848
|
M/S. Kamrul & Brothers
|
131.848
|
22/10/2023
|
18/10/2024
|
100
|
03/11/2024
|
|
5
|
UIIP-PCO/BCO/W-482
|
(1) Construction of 4.00x4.0m 2-vent RCC Box Culvert on Dhalibari road to Gussogram Homio College connecting road under Gopalgnaj Pourashava
(2) Construction of 4.00x4.0m 2-vent RCC Box Culvert on Boiragi Khal (near Miapara Mosque) Miapara Connecting road under Gopalgnaj Pourashava
|
|
72.262
|
M/S Lalin Traders
|
72.262
|
24/04/2022
|
17/04/2023
|
100
|
03/11/2024
|
|
6
|
UIIP-PCO/BCO/W-481
|
(1) Estimate for Construction of RCC road & Masonary drain work at Teghoria bylane road starting fromm Teghoria road to Selim Fakir house under Gopalgnaj Pourashava L=100.00m
(2) Estimate for Constrcution work of RCC Drain at Bedgram Barobari starting from Fierservice road to Sariful house RCC dran via Sajahan munsi house under Gopalgnaj Pourashava (Ch00-302.00m)
(3) Estimate for Construction of RCC road & Masonary drain work at Moulovhipara bylane road starting from Moulovhipara road to Beptist Charge under Gopalgnaj Pourashava L=82.00m
(4) Estimate for Construction work of RCC Drain at Chandmary bylane road starting from Farhad house to Akhil house under Gopalgnaj Pourashava (Ch00-45.00m)
|
0.1820
|
90.482
|
M/S Saiful Traders
|
90.482
|
24/04/2022
|
17/04/2023
|
100
|
03/11/2024
|
|
7
|
UIIP-PCO/BCO/W-480
|
(1) Estimate for Construction work of Gobra bylane road by HBB starting from Bypass road to Vercity Khalpar road via Ratan house under Gopalganj's Pourashava L=360.00m (2) Estimate for Construction work of RCC Drain at Kristanpara starting from Nazma upa house to DC road Pipe dran via Batu mia house under Gopalganj's Pourashava (Ch00-174.00m) (3) Estimate for Construction work of RCC Drain at Teghori Bottola starting from Ad. Kalachand house to RCC connecting drain via Gobinda master house under Gopalganj's Pourashava (Ch00-174.00m)
|
|
89.550
|
M/S Lalin Traders
|
89.550
|
24/04/2022
|
17/04/2023
|
100
|
03/11/2024
|
|
8
|
UIIP-PCO/BCO/W-479
|
(1) Estimate for Maintenance work of Natun bazar & Sikderpara road by BC Starting from BB road to DC road under Gopalganj's Pourashava (Ch00-622.00m+150.00m=772.00m) W-02 (2) Estimate for Improvement work of BC at Chachaniakandi road starting from Bypass to Mandertola road (Backchibari more) under Gopalganj's Pourashava. Ch00-738.00m
|
1.5100
|
110.769
|
M/S Lalin Traders
|
110.769
|
24/04/2022
|
17/04/2023
|
100
|
03/11/2024
|
|
9
|
UIIP-PCO/BCO/W-478
|
Estimate for Maintenance work of SP Office road & Ahosan Uddin road and Mandertola road by BC starting from DC Office more to Bypass road Link road Quart Mosijd to Rumi House under Gopalganj's Pourashava (Ch00-2156.00m+158.00=2314.00m) W-07,08
|
2.3140
|
116.594
|
M/S Lalin Traders
|
116.594
|
24/04/2022
|
17/04/2023
|
100
|
03/11/2024
|
|
10
|
UIIP-PCO/BCO/W-477
|
Estimate for Construction of RCC road & Drain at Marcus Mohalla Starting from Hanif Mia House to Education Office & Chatal L-791.00m W-09
|
0.7910
|
102.750
|
M/S Kamrul and Brothers
|
102.750
|
14/04/2022
|
17/04/2023
|
100
|
03/11/2024
|
|
11
|
UIIP-PCO/BCO/W-204
|
1) Construction of BC Road at Sashan Road starting from Chapail road ti Poura Sashan L-186.00, W-9.
2) Construction of RCC road at Chapail road bylane starting from Chapail road to Nannu Molla house. L-300.00, wide-3.00m, W-09
3) Construction of RCC road at Shisuban bylane starting from Zella Nirbachon Office to Scout Bhaban, L-52.00m, Wide-4.50, W-09
4) Construction work of RCC at Dumping Center road starting from Chapail road to Dumping center under Gopalganj's Pourashava (ch. 00-250m) W-09.
|
0.6020
|
110.500
|
M/S. Kamrul & Brothers
|
110.500
|
19/11/2020
|
11/11/2021
|
100
|
03/11/2024
|
|
12
|
UIIP-PCO/BCO/W-476
|
01. Estimate for Construction of RCC road & RCC Drain at Paddapukur starting form nearable Nowsar House to Banker Borhan House W-07
(2) Estimate for Construction of RCC raod at Bedgram Vajaler Math bylane starting from Sumon house to Salim Fakir House L-90.00m Wide-3.00m Word-01
(3) Estimate for Construction of RCC road at Sisubon starting from Mohila College Gate to Sheik Hasina Hostel L-126.00m Wide-2.50m Word-07
(4) Estimate for Construction of RCC Drain at Moulavipara Starting from Razu Mojahik to Nantu Khan House via Hizbulla house L-120.00m Word-01
(5) Estimate for Construction of 1) RCC road Karargati starting from Dhaka Khulna road to Doc Probir Banargy house L-73.00m,2) HBB Road Dhaka Khulna road to Roy Bari L= 165.00, w-3.00 word 01.
(6) Estimate for Construction of RCC Drain at Islambag starting from Md. Serajul Haque house to Nearable Islambag Mosque L-60m Word-08
|
0.4990
|
80.948
|
M/S Nizam Traders
|
80.948
|
24/04/2022
|
17/04/2023
|
100
|
03/11/2024
|
|
13
|
UIIP-PCO/BCO/W-203
|
1) Construction of RCC Road at Chachaniakandi road bylane starting from Chachaniakandi road to Parimal Mozumdar House, Link-1 Triple House, Link-2 Abdur Rashid house. L-265m, Wide-2.00m, W-08 2) Construction of HBB road at Chachaniakandi road bylane starting from Chachaniakandi NSI house to Dhaka-Khulna Road, L-375m, W-08. 3) Construction of RCC road at Mohammadpara starting from Maleka Academi more to Asrom Road. L-310.00m, Wide(2.4+.80)= 3.20m, W-8
|
0.9509
|
87.356
|
M/S. Saiful Traders
|
87.356
|
|
11/11/2021
|
100
|
27/09/2022
|
26.51%
Less
|
14
|
UIIP-PCO/BCO/W-202
|
1) Construction of RCC road & Drain at Biswas Bari road bylane starting from Biswas Bari road to professor Lutfor Rahman house. L-84.00m, wide-2.35m, W-4
2) Construction of HBB road at east Arambag starting from Dayud Mia house to Iqbal land via Kowsar Land. L-310m, wide-3.00m, W-04.
3) Construction of HBB road at East Arambag starting from Kowsar House to Naru Gopal House. L-126.00m, wide-3.00, W-4.
4) Construction of HBB road staring from Purbo Miapara bisha road to Purbo Arambag H/O Daud Mia H/O Tutul, W-04 under Gopalganj's Pourasahva. (ch. 0.00-550.00m)
|
1.0700
|
17.707
|
M/S. Saiful Traders
|
17.707
|
|
11/11/2021
|
100
|
27/09/2022
|
26.50%
Less
|
15
|
UIIP-BC/PCO/W-11
|
(1) Construction of BSF road at Shaplabag starting from Shaplabag road to Court Mosjid Immam house, Link 1 Thanda Molla House to Montu Mia House, Link 2 Bipul Mondal House L-(210+182+46)=438m, Wide-2.00m, W-07 (2) Construction work of RCC Appron at Gopalganj's Pourashava Office vhabon Entry road under Gopalganj's Pourashava.(CH00-81.0m). Word no-07.
|
0.4380
|
6.110
|
M/S. Nabiha Enterprise
|
6.110
|
10/09/2020
|
02/09/2021
|
100
|
27/09/2022
|
26.00%
Less
|
16
|
UIIP-BC/PCO/W-10
|
(1 Construction of RCC road at Arambag starting from Purabi house to Khakan Biswas House L-14m, Wide-2.00m, W-06
(2) Construction of RCC road at Amena School Road bylane starting from Amena School Gate to Israfil House L-132m, Wide-2.00m, W-06
(3) Construction of RCC road at Amena School Road bylane starting from Amena School Road to Rakib House L-60m, Wide-2.00m, W-06
(4) Construction of RCC road & M. Drain at Amena School Road bylane starting from Amena School Road to Tapos House L-57m, Wide-2.00m, W-06
(5) Construction of RCC road at Arambag (Bypass Connecting Road) bylane starting from Bypass Connecting Road to Jabber House L-105m, W-06
(6) Construction of RCC road at East Arambag (Santibag) bylane starting from Santibag Road to Alom House L-90m, W-06
(7) Construction of RCC road at Arambag Shamol Podder House to Monir Decotor House L-95m, W-06
(8) Construction of RCC road at Arambag starting Bairagi Khal to Sujan Bala House L-67m, Wide-2.00m, W-06
|
0.6200
|
10.229
|
M/S. Niaz Traders
|
10.229
|
10/09/2020
|
02/09/2021
|
100
|
27/09/2022
|
23.75%
Less
|
17
|
UIIP-BC/PCO/W-09
|
(1) Construction of RCC road at Rokon Uddin Trust road starting from Mali Mother Shop to Kabir Master House L-111m, Wide-2.50m, W-03
(2) Construction of RCC road at Rokon Uddin Trust road starting from Ekramul Huda House to Fire Service bylane (Loclman) L-70m, Wide-2.00m, W-03
(3) Development of Abul Basher road by BC Starting from Miapara Mosque to Bokultola road, Ward-03, L=447, Wide 3.5m. (Ch. 0.00 to 447.0m.)
(4) Construction work of RCC Drain & Road at Bakultola starting from DC road to old RCC Drain under Gopalganj'sPourashava.(ch00-160.0m). word no-03
|
0.7880
|
74.019
|
M/S. Nabiha Enterprise
|
74.019
|
10/09/2020
|
02/09/2021
|
100
|
27/09/2022
|
25.64%
Less
|
18
|
UIIP-BC/PCO/W-08
|
(1) Construction of RCC road & Drain at Gohata bylane starting from Gohata road to Md Rafiqul Islam House L-52m, Wide-2.00m, W-05
(2) Construction of RCC road & Cross Drain Gohata Bottola starting from Gohata road Bottola to Narayan Chandra Biswas House, L-63m, Wide-2.05m, W-05
(3) Construction of HBB road at Shaplabag road bylane starting from Shaplabag Road to Teacher Collone Drain, L-195m, W-07
(4) Construction of RCC Drain at Lichubagan starting from Tekka House to Natun School Road Drain L-64.500 Word -7
(5) Construction of RCC road & RCC Drain at Teacher Colloni Road bylane starting from Teacher Colloni More to Ulka Apa House L-270m, W-07
(6) Construction of RCC road at Natun Bazar starting from Word Councilor Biplob vi House Corner toTahaz Molla House L-76m, Wide-2.05m, W-02
|
0.6560
|
90.510
|
M/S. Benojire Construction
|
90.510
|
10/09/2020
|
02/09/2021
|
100
|
27/09/2022
|
23.05%
Less
|
19
|
UIIP-BC/PCO/W-07
|
(1) Construction of RCC road at Kalabagan starting from Kalabagan road (NearableAnowar Manager House) to Refaul Land L-66.00, Wide-3.00m, Word -1
(2) Construction of RCC road at Moulavipara starting from Mazor Mizanur house to Sha-AlamMolla House L-180m, W-01
(3) Construction of RCC & BSF road at Near Vagelar Math starting from In front of Mani Mia House to Fair Service Back side Road L-(93+40+47)=180m, W-01
(4) Construction & Improvement work of CC road at Moulovipara bylane road starting from Musa Molla house to Saha Alom Molla house & link road under Gopalganj's Pourashava.(ch00-333.0m),w-01
(5) Improvement work of CC road at Mouloviparabylane road starting from Shohel house to Bitu Councilor house & link road under Gopalganj's Pourashava.(ch00-260.0m),w-01
|
1.0190
|
95.157
|
M/S. Nabiha Enterprise
|
95.157
|
|
07/09/2021
|
100
|
27/09/2022
|
30.75%
Less
|
|
2
|
Muksudpur
|
1
|
UIIP/PCO/G-57
|
Implementation & Supply 521 nos Waste Basket (120 ltr) & 25 nos Non-motorized vehicle (van) under Muksudpur Pourashava District: Gopalganj.
|
|
39.997
|
RFL Plastics Limited
|
39.997
|
|
|
0
|
03/11/2024
|
|
2
|
UIIP-BC/PCO/W-605
|
Improvement of RCC road from Munsur Munsi House( Mia Bari mosjid to south mia bari road) to Mojibur Mollah (chourongi road to Atadanga road) with 03 nos RCC cross drain and 68 m RCC palisading at ward no. 05 under Muksudpur Paurashava. (Total Length=288m)
|
0.2880
|
55.456
|
M/S Arafat Traders-Alam Shikder Construction Ltd.
|
55.456
|
16/05/2023
|
15/05/2024
|
100
|
03/11/2024
|
|
3
|
UIIP-BC/PCO/W-541
|
A) Construction of One no. Shed for Public Transport Passenger (28.00sqm) in South Candibordi, Ward No.04, Under Muksudpur Pourashava, Dist: Gopalganj.
B) Construction of One Storied Public Toilet (Type A=56.00sqm) near Kamlapur Bus Stand, Ward No.07, Under Muksudpur Pourashava, Dist: Gopalganj.
|
|
46.954
|
M/S Arafat Traders-Alam Shikder Construction (JV)
|
46.954
|
20/02/2023
|
20/02/2024
|
79
|
03/11/2024
|
|
4
|
UIIP-BC/PCO/W-535
|
A) Improvement of road by RCC from Mohammad Ali Sheikh house to Moiur Ali Mia House at Gopinathpur ward No.-05 Under Muksudpur Pourashava, Gopalganj (L=310m)
B) Improvement of road by RCC from Dulal Munsi house to M.A. Khalek Govt. Primary School at Lokheirchar at ward No.-01 under Muksudpur Pourashava, Gopalganj (L=250m)
C) Improvement of road by RCC from Rejaul Sheikh house to Kiramot house at Provakordi at ward No-02 under Muksudpur Pourashava, Gopalganj (L=150m)
|
|
64.080
|
M/S Arafat Traders-Alam Shikder Construction (JV)
|
64.080
|
20/02/2023
|
20/02/2024
|
100
|
03/11/2024
|
|
5
|
UIIP-BC/PCO/W-391
|
(A) Construction of RCC Drain in Gopinathpur Salim Sarder’s house to Karitas Office Khal via Link Drain Sazzad mia’s house at Ch.00 to 750m Starting From Ch.00.00-400.00 Width=1000mm, Hight= 1750mm (avg) Total Length=750m (Word No.05)
|
|
195.950
|
M/S. Kamrul & Brothers
|
195.950
|
07/07/2022
|
30/05/2024
|
95
|
03/11/2024
|
|
6
|
UIIP-BC/PCO/W-277
|
(1) Improvement of road by BC from Provakurdi Faruk Sheikh house to Naryan Member house word no-3 at Muksudpur paurashava Gopalganj's. L=660.00m.(2) Improvement of road by BC from Provakordi main road to Nobin Chondra road via Boro Bari Madrasha (word no-2) at Muksudpur paurashava, Gopalganj's. L=726.00m.(3) Improvement of road by BC from Bishow road to Nagar Sundordi Tushar Mia house word no-3 at Muksudpur paurashava Gopalganj's. L=460.00m.(4) Improvement of road by BC from Provakurdi main road to Tara mia house word no-2 at Muksudpur paurashava Gopalganj's. L=390.00m.
|
2.2360
|
131.949
|
M/S. Benojire Construction
|
131.949
|
09/11/2021
|
09/11/2021
|
100
|
03/11/2024
|
|
7
|
UIIP-BC/PCO/W-276
|
(1) Improvement of road by BC from Provakordi Muslem Khandaker house to Mohiuddin house (word no-2) at Muksudpur paurashava, Gopalganj's. L=426.00m. (2) Improvement of road by BC Part-A: From Lakhayerchar Main BC road to Kalimondir, L= 150.00m. Part-B: From Lakhayerchar Main BC road to River Ghat, L= 650.00m (word no-01) at Muksudpur paurashava, Gopalganj's. Total Length = 800.00m. (3) Improvement of road by BC From Bisshow road Gopinathpur Sugom Madrasa (Word no-5) at Muksudpur paurashava, Gopalganj's. L=340.00m.
|
1.5660
|
123.920
|
M/S. Benojire Construction
|
123.920
|
09/11/2021
|
09/11/2022
|
100
|
03/11/2024
|
|
8
|
UIIP-BC/PCO/W-275
|
(1) Improvement of road by RCC from Tangrakhola Khal Par road to Hunnan mia house word no-6 at Muksudpur paurashava Gopalganj's. L=510.00m.(2) Improvement of road by RCC from Komlapur Zahad mia house to Oli mollahs house word no-7 at Muksudpur paurashava Gopalganj's. L=200.00m. (3) Improvement of road by RCC from Komlapur Mozibur sarder house to komlapur Abdul hi house word no-8 at Muksudpur paurashava Gopalganj's. L=820.00m. (4) Improvement of road by RCC from Gopinathpur BC road near mamun shops to Munshi Bari (word no-5) at Muksudpur paurashava, Gopalganj's. L=150.00m.
|
1.6800
|
205.492
|
NISHIT-SHOWROVE JV
|
205.492
|
06/12/2021
|
06/12/2022
|
100
|
03/11/2024
|
|
9
|
UIIP-BC/PCO/W-390
|
1 . Improvement of Golabaria Singboard-Vandaria road at CH 00 to 700m by 25mm Dense Carpeting W0rd No 09 Lenght 700m;2. Construction of Kamlapur-Dorika Dagga road at CH 00 to 670m by 25mm Dense Carpeting with ASS Word No 08. Lenght 670m;3. Construction of 4.50 X 4.50m RCC Box Culvert in Kamlapur-Dorika Dagga road near Harir Vuy Word No 08 in same road; 4. Construction of Dr.Boloram house road in Kamlapur Starting from Kamlapur Bus Stand to Muksudpur-Jalil par-Ujani road by RCC at Ch. 00 to 400m Word No 07 Length 400m
|
1.7700
|
157.136
|
M/S. Kamrul & Brothers
|
157.136
|
16/09/2021
|
16/09/2022
|
100
|
27/09/2022
|
0.59%
Less
|
10
|
UIIP-BC/PCO/W-105
|
1. Improvement of road by BC from Komlapur khodakar Bazar Chand hat road to Baroy para Shaha bari Woard no-8 at Muksudpur Paurashava Gopalganj's. L=390.00m (2) Improvement of road by BC from Komlapur Whahed Fakir house to Hobu mia house via Hannan houseWoard no-7 at Muksudpur Paurashava Gopalganj's. L=210.00m. (3) Improvement of road by BC from Tangrakhola Battala road Rawshon mia house to khalper via Sobuj Mia & Akram Chowdhory House Woard no-6 at Muksudpur Paurashava Gopalganj's. L=513.00mand(4) Improvement of road by BC from Golabaria Sign Board R&H way to End of Paura Boundary Via Vandaria Mohammad Kha & Hobi Mollah house Woard no-9 at Muksudpur Paurashava Gopalganj's. L=600.00m
|
1.7130
|
130.756
|
M/S. Showrove Traders
|
130.756
|
|
19/09/2021
|
100
|
27/09/2022
|
14.00%
Less
(Final Bill Done)
|
11
|
UIIP-BC/PCO/W-104
|
1 Improvement of road by RCC from Gopinathpur X-Upazila Chairman House to Muksudpur Collage Woard no-5 at Muksudpur Paurashava Gopalganj's. L 450.00m.2 Improvement of road by RCC from Komlapur Year Ali house to Battala via South Para Jame Mosque Woard no-7 at Muksudpur Paurashava Gopalganj's. L 385.00m.3 Part-A Improvement of Road by RCC with RCC Drain from Chondibordi Ripon Kha house to Sorowar Khan house Woard no-4 at Muksudpur Paurashava Gopalganj's. L122.00m.-B Construction of RCC Drain from Sonali Bank to Fish Market via Samim Mollah House Woard no-4 at Muksudpur Paurashava Gopalganj's. L175.00m Total-L297.00m
|
0.8350
|
123.598
|
M/S. Showrove Traders
|
123.598
|
|
19/09/2021
|
100
|
27/09/2022
|
14.00%
Less
(Final Bill Done)
|
|
3
|
Tungipara
|
1
|
UIIP/PCO/G-56
|
Estimate of implelemtation of 634.00 nos Waste Basket (120 ltr) & 18.00 nos Non-motorized vehicle (van) under Tungipara Pourashava District: Gopalganj.
|
|
39.949
|
RFL Plastrics Limited
|
39.949
|
27/03/2024
|
28/09/2024
|
0
|
03/11/2024
|
|
2
|
UIIP-PCO/BCO/W-604
|
(A) Construction of RCC Road at Near by H/O Mr. Tutul Sikdar to Tungipara Bypass Road 01 no Gate at Ch.0.00 to 144.00m under Tungipara Pourashava , Gopalganj. (Salvage Amount=14,165.00).
(B) Construction of RCC Road Starting from Sardarpara Primary School Near by H/O Mr. Sheikh Tuhin at Ch. 0.00 to 132.00m under Tungipara Pourashava , Gopalganj.
(B) Construction of RCC Cover Drain work Near by Poura Bhaban at Ch. 0.00 to 180.00m Ward no. 02 under Tungipara Pourashava , Gopalganj.
|
|
93.760
|
|
93.760
|
|
|
0
|
03/11/2024
|
Re-Tender Processing
|
3
|
UIIP-PCO/BCO/W-490
|
(A) Construction of RCC Cover Drain cum RCC Road with 100mm dia uPVC Water Supplying Line at 4 No Ward starting from Near the Gov Quarter Chairman up to East Tungipara main Road Ch: 0-480.00m)
(B) Construction of RCC Cover Drain cum RCC Road starting from Nearby Upazila Mosque South West Corner at Ward No 04 up to Kazibari Ch:0-150.00m Total Length-630.00m Under Tungipara Pourashava Tungipara District: Gopalganj
|
|
262.790
|
M/S. Mahmud Haque
|
262.790
|
02/02/2023
|
13/04/2024
|
73
|
03/11/2024
|
|
4
|
UIIP-PCO/BCO/W-489
|
(A) 2 No Ward Construction of RCC Cover Drain starting from Nearby H/O Mr. Kamrul Sheikh to Hazibari Ghat Ch:0-250.00m)
(B) 6 No Ward Construction of RCC Cover Drain starting from Near By H/O Mr. Tabibur to Sarderpara Main Drain Ch: 0-80.00m
(C) 4 No Ward Construction of RCC Cover Drain cum RCC Road starting from Nearby Food Godown Road to H/O Gazibari Ch:0-130.00m
(D) 4 No Ward Construction of RCC Cover Drain cum RCC Road starting from Near By Food Godown Road to H/O Mr. Mahan Ch: 0-130.00m Under Tungipara Pourashava Tungipara District: Gopalganj
|
|
197.430
|
M/S. Mahmud Haque
|
197.430
|
02/02/2023
|
13/04/2024
|
61
|
03/11/2024
|
|
5
|
UIIP-PCO/BCO/W-488
|
(1) Construction RCC Road starting From (a) Sardarpara RHD main Road to Near the House of Mr. Mohammad Ali Fakir at Ward No-06 Ch0-70 (b) Sardarpara RHD Main Road to Near the House of Mr. Golam Rosul via Mr. Lotif House With Retaining Wall & 3 Nos Link Road at Ward No-06 Under Tungipara Pourashava Dist: Gopalganj's Ch 0-180m Total Length (70+180)=250m. (2) Construction RCC Road starting From (a) Patgati Kitchen Market Road to Patgati Animal Yard of length 165.00m (b) Patgati Kitchen Market Road near The House of Mr. Robiul upto patgati Animal Yard at Ward No-09 of Length 46.00m Under Tungipara Pourashava Dist: Gopalganj's Total Length=211.00m
|
0.4610
|
127.801
|
Md. Babul sheikh
|
127.801
|
15/06/2022
|
11/06/2023
|
100
|
03/11/2024
|
|
6
|
UIIP-PCO/BCO/W-487
|
(1) Construction RCC Drain starting From Patgati Sadarpara beside the Mr. Billal Hossain house to RDH By Pass Road Side Khal at Ward No-07 Under Tungipara Pourashava Dist: Gopalganj's (Main Drain 220m Link 120m) Total Length 340.00m (2) Construction RCC Drain starting From Infront of Patgati Bottola Mondir To Patgati Khal With RDH Crossing at Ward No-09 Under Tungipara Pourashava Dist: Gopalganj's (Main Drain 105m Cross 2nos (20+25=45) Total Length 150.00m.
|
|
136.609
|
M/S. S.S Traders
|
136.609
|
15/06/2022
|
11/06/2023
|
100
|
03/11/2024
|
|
7
|
UIIP-PCO/BCO/W-03
|
Contruction RCC Drain Starting from Kazi Eyad Ali House to House of Mr. Babul Master at Ward no-05 Under TungiparaPourashava Gopalganj's. Ch0.00-195.000m
Contruction RCC Drain Starting from Kazi Anower House to Gimadangi Khal at Keraikopa Ward No 02 Under Tungipara Pourashava Gopalganj's. Ch0.00-115.000m
Contruction RCC Drain Starting from Kazi Deloar Brother House to House of Kazi Anower at Keraikopa Wadr No-02 Under Tungipara Pourashava Gopalganj's. Ch0.00-120.000m
Contruction RCC Drain Starting from Kurdus Sheikh House to Tungipara Khal at Ward No-05 Under Tungipara Pourashava Gopalganj's. Ch0.00-50.000m.
Construction of RCC Drain Starting from Sheikh Buranuddin House upto Sheikh Kabir Sir at Tungipara Under Tungipara Paurashava Gopalganj's. Ch 0.00-60.00m”
|
|
131.259
|
Md. Babul sheikh
|
131.259
|
09/12/2020
|
30/03/2022
|
100
|
03/11/2024
|
|
8
|
UIIP-PCO/BCO/W-02
|
Construction of RCC Drain Starting from the End of CCTF RCC Drain in front of Milk vita Store by the side of Patgati Main Road upto RHD Tungipara-Gopalganj's Main Road Near by Modumoti Counter at Ward no-08 Under Tungipara Pourashava Gopalganj's. Drain Ch0-310.00m.
|
|
77.003
|
Md. Babul sheikh
|
77.003
|
19/08/2020
|
30/03/2022
|
100
|
03/11/2024
|
|
9
|
UIIP-PCO/BCO/W-06
|
1. Construction of H.B.B Road Starting from Sheikh Hasina Gate to modhumoti River Ghat With Animal Yard at ward no-09 under Tungipara Paurashava.(L=460.00m) 2. Construction of H.B.B Road Starting from New Bus Terminal New gate to RHD Akkas Saw Mill Raod at ward no-09 under Tungipara Paurashava, L=180m.
|
0.6400
|
112.410
|
Md. Babul sheikh
|
112.410
|
09/12/2020
|
08/11/2021
|
100
|
27/09/2022
|
27.50%
Less
|
10
|
UIIP-PCO/BCO/W-05
|
Part -A: Construction of RCC Drain Starting from Tungipara poura Water plant Vaia Mr. Asarot/ Kinar Molla House to Baghin River at Word no-03. Part -B : Construction of RCC Drain Starting from Purbo Tungipara Billal Molla House side Baghia River at Word No-03 Under Tungipar pourashava. Gopalgang ch. 00-215m.
|
|
53.777
|
Md. Babul sheikh
|
53.777
|
09/12/2020
|
30/03/2022
|
100
|
27/09/2022
|
28.44%
Less
(Time Extended)
|
11
|
UIIP-PCO/BCO/W-04
|
Part 01. Construction of RCC Road Starting from Patgati old Bus-stand Road via Manik Mia super Murket upto Modhumati Clinic Via Joglul House at Word no-08 ( Ch. 0.0 to Ch. 289.00 m ) ( L= 289.00 m ) Part 02 . Reabilitation of Road by RCC Starting from Sheikh Salim House to Gubtola Bridge at Ward no-05 Under Tungipara Pourashava (L=165m).
|
0.4540
|
74.964
|
M/S. Monir Traders
|
74.964
|
09/12/2020
|
08/11/2021
|
100
|
27/09/2022
|
27.50%
Less
|
12
|
UIIP-PCO/BCO/W-01
|
A. Construction of RCC Road Startingfrom 2 No Gate Mausoleum RHD Road Near the House of Mr.Juber Sheikh to H/O Mr. Chalim Miah at Sardarpara Under Tungipara Pourashava Gopalganj's. Road Ch 00-320.00m
B Construction of RCC Road Starting from Sarder at Near theHouse of Mr. Rakib Sheikh to H/O Mr. Rabiul Miah atSarderpara at Aard No-06 Under Tungipara PourashavaGopalganj's Road ch 0-200.00m
A. Construction of RCC Road Startingfrom Kerailkopa Main Road to H/O Kazi Dulal at KerailkopaUnder Tungipara Pourashava Gopalganj's. Road Ch 00-120.00m
B. Construction of RCC Road Starting from Kerailkopa Main. Road to H/O Kazi Azad Hossain at Kerailkopa UnderTungipara Pourashava Gopalganj's. Road Ch 00-60.00m
C Construction of RCC Road Starting from 2 No Gate RHD toH/O Mr. Mahabub Hossain at Sardarpara Under TungiparaPourashava Gopalganj's. Road Ch 00-60.00m.
D Construction of RCC Road Starting from Patgati Main to Patgati Jame Mosquest at Patgati Under TungiparaPourashava Gopalganj's. Road Ch 00-70.00m.
|
0.8300
|
94.252
|
Md. Babul sheikh
|
94.252
|
10/09/2020
|
02/09/2021
|
100
|
27/09/2022
|
27.36%
Less
|
|
Total :
|
27.3049 (Km)
|
4357.18 (Lac)
|
4357.18 (Lac)
|
|
|
|
|
|
|