Project Scheme Detail List
SL No. Package No. Name Length (Km) Allotment (Lac) Name of Contractor Contract Amount (Lac) Date of Commencement Date of Completion Physical Progress (%) Date of Progress Update Remarks
1 Gopalganj-s
1 UIIP-PCO/BCO/W-482 (1) Construction of 4.00x4.0m 2-vent RCC Box Culvert on Dhalibari road to Gussogram Homio College connecting road under Gopalgnaj Pourashava (2) Construction of 4.00x4.0m 2-vent RCC Box Culvert on Boiragi Khal (near Miapara Mosque) Miapara Connecting road under Gopalgnaj Pourashava 72.262 M/S Lalin Traders 72.262 24/04/2022 17/04/2023 0 27/09/2022 19.64% Less
2 UIIP-PCO/BCO/W-481 (1) Estimate for Construction of RCC road & Masonary drain work at Teghoria bylane road starting fromm Teghoria road to Selim Fakir house under Gopalgnaj Pourashava L=100.00m (2) Estimate for Constrcution work of RCC Drain at Bedgram Barobari starting from Fierservice road to Sariful house RCC dran via Sajahan munsi house under Gopalgnaj Pourashava (Ch00-302.00m) (3) Estimate for Construction of RCC road & Masonary drain work at Moulovhipara bylane road starting from Moulovhipara road to Beptist Charge under Gopalgnaj Pourashava L=82.00m (4) Estimate for Construction work of RCC Drain at Chandmary bylane road starting from Farhad house to Akhil house under Gopalgnaj Pourashava (Ch00-45.00m) 0.1820 90.482 M/S Saiful Traders 90.482 24/04/2022 17/04/2023 5 27/09/2022 24.83% Less
3 UIIP-PCO/BCO/W-480 (1) Estimate for Construction work of Gobra bylane road by HBB starting from Bypass road to Vercity Khalpar road via Ratan house under Gopalganj's Pourashava L=360.00m (2) Estimate for Construction work of RCC Drain at Kristanpara starting from Nazma upa house to DC road Pipe dran via Batu mia house under Gopalganj's Pourashava (Ch00-174.00m) (3) Estimate for Construction work of RCC Drain at Teghori Bottola starting from Ad. Kalachand house to RCC connecting drain via Gobinda master house under Gopalganj's Pourashava (Ch00-174.00m) 0.3600 89.550 M/S Lalin Traders 89.550 24/04/2022 17/04/2023 5 27/09/2022 19.47% Less
4 UIIP-PCO/BCO/W-479 (1) Estimate for Maintenance work of Natun bazar & Sikderpara road by BC Starting from BB road to DC road under Gopalganj's Pourashava (Ch00-622.00m+150.00m=772.00m) W-02 (2) Estimate for Improvement work of BC at Chachaniakandi road starting from Bypass to Mandertola road (Backchibari more) under Gopalganj's Pourashava. Ch00-738.00m 0.7720 110.769 M/S Lalin Traders 110.769 24/04/2022 17/04/2023 5 27/09/2022 26.16% Less
5 UIIP-PCO/BCO/W-478 Estimate for Maintenance work of SP Office road & Ahosan Uddin road and Mandertola road by BC starting from DC Office more to Bypass road Link road Quart Mosijd to Rumi House under Gopalganj's Pourashava (Ch00-2156.00m+158.00=2314.00m) W-07,08 2.3140 116.594 M/S Lalin Traders 116.594 24/04/2022 17/04/2023 0 27/09/2022 25% Less
6 UIIP-PCO/BCO/W-477 Estimate for Construction of RCC road & Drain at Marcus Mohalla Starting from Hanif Mia House to Education Office & Chatal L-791.00m W-09 0.7910 102.750 M/S Kamrul and Brothers 102.750 14/04/2022 17/04/2023 5 27/09/2022 26% Less
7 UIIP-PCO/BCO/W-476 01. Estimate for Construction of RCC road & RCC Drain at Paddapukur starting form nearable Nowsar House to Banker Borhan House W-07 (2) Estimate for Construction of RCC raod at Bedgram Vajaler Math bylane starting from Sumon house to Salim Fakir House L-90.00m Wide-3.00m Word-01 (3) Estimate for Construction of RCC road at Sisubon starting from Mohila College Gate to Sheik Hasina Hostel L-126.00m Wide-2.50m Word-07 (4) Estimate for Construction of RCC Drain at Moulavipara Starting from Razu Mojahik to Nantu Khan House via Hizbulla house L-120.00m Word-01 (5) Estimate for Construction of 1) RCC road Karargati starting from Dhaka Khulna road to Doc Probir Banargy house L-73.00m,2) HBB Road Dhaka Khulna road to Roy Bari L= 165.00, w-3.00 word 01. (6) Estimate for Construction of RCC Drain at Islambag starting from Md. Serajul Haque house to Nearable Islambag Mosque L-60m Word-08 0.4990 235.989 M/S Nizam Traders 235.989 17/04/2023 0 27/09/2022 23.5% Less
8 UIIP-PCO/BCO/W-204 1) Construction of BC Road at Sashan Road starting from Chapail road ti Poura Sashan L-186.00, W-9. 2) Construction of RCC road at Chapail road bylane starting from Chapail road to Nannu Molla house. L-300.00, wide-3.00m, W-09 3) Construction of RCC road at Shisuban bylane starting from Zella Nirbachon Office to Scout Bhaban, L-52.00m, Wide-4.50, W-09 4) Construction work of RCC at Dumping Center road starting from Chapail road to Dumping center under Gopalganj's Pourashava (ch. 00-250m) W-09. 0.7880 18.582 M/S. Kamrul & Brothers 18.582 11/11/2021 6 27/09/2022 27.62% Less
9 UIIP-PCO/BCO/W-203 1) Construction of RCC Road at Chachaniakandi road bylane starting from Chachaniakandi road to Parimal Mozumdar House, Link-1 Triple House, Link-2 Abdur Rashid house. L-265m, Wide-2.00m, W-08 2) Construction of HBB road at Chachaniakandi road bylane starting from Chachaniakandi NSI house to Dhaka-Khulna Road, L-375m, W-08. 3) Construction of RCC road at Mohammadpara starting from Maleka Academi more to Asrom Road. L-310.00m, Wide(2.4+.80)= 3.20m, W-8 0.9509 87.356 M/S. Saiful Traders 87.356 11/11/2021 100 27/09/2022 26.51% Less
10 UIIP-PCO/BCO/W-202 1) Construction of RCC road & Drain at Biswas Bari road bylane starting from Biswas Bari road to professor Lutfor Rahman house. L-84.00m, wide-2.35m, W-4 2) Construction of HBB road at east Arambag starting from Dayud Mia house to Iqbal land via Kowsar Land. L-310m, wide-3.00m, W-04. 3) Construction of HBB road at East Arambag starting from Kowsar House to Naru Gopal House. L-126.00m, wide-3.00, W-4. 4) Construction of HBB road staring from Purbo Miapara bisha road to Purbo Arambag H/O Daud Mia H/O Tutul, W-04 under Gopalganj's Pourasahva. (ch. 0.00-550.00m) 1.0700 17.707 M/S. Saiful Traders 17.707 11/11/2021 100 27/09/2022 26.50% Less
11 UIIP-BC/PCO/W-11 (1) Construction of BSF road at Shaplabag starting from Shaplabag road to Court Mosjid Immam house, Link 1 Thanda Molla House to Montu Mia House, Link 2 Bipul Mondal House L-(210+182+46)=438m, Wide-2.00m, W-07 (2) Construction work of RCC Appron at Gopalganj's Pourashava Office vhabon Entry road under Gopalganj's Pourashava.(CH00-81.0m). Word no-07. 0.4380 6.110 M/S. Nabiha Enterprise 6.110 10/09/2020 02/09/2021 100 27/09/2022 26.00% Less
12 UIIP-BC/PCO/W-10 (1 Construction of RCC road at Arambag starting from Purabi house to Khakan Biswas House L-14m, Wide-2.00m, W-06 (2) Construction of RCC road at Amena School Road bylane starting from Amena School Gate to Israfil House L-132m, Wide-2.00m, W-06 (3) Construction of RCC road at Amena School Road bylane starting from Amena School Road to Rakib House L-60m, Wide-2.00m, W-06 (4) Construction of RCC road & M. Drain at Amena School Road bylane starting from Amena School Road to Tapos House L-57m, Wide-2.00m, W-06 (5) Construction of RCC road at Arambag (Bypass Connecting Road) bylane starting from Bypass Connecting Road to Jabber House L-105m, W-06 (6) Construction of RCC road at East Arambag (Santibag) bylane starting from Santibag Road to Alom House L-90m, W-06 (7) Construction of RCC road at Arambag Shamol Podder House to Monir Decotor House L-95m, W-06 (8) Construction of RCC road at Arambag starting Bairagi Khal to Sujan Bala House L-67m, Wide-2.00m, W-06 0.6200 10.229 M/S. Niaz Traders 10.229 10/09/2020 02/09/2021 100 27/09/2022 23.75% Less
13 UIIP-BC/PCO/W-09 (1) Construction of RCC road at Rokon Uddin Trust road starting from Mali Mother Shop to Kabir Master House L-111m, Wide-2.50m, W-03 (2) Construction of RCC road at Rokon Uddin Trust road starting from Ekramul Huda House to Fire Service bylane (Loclman) L-70m, Wide-2.00m, W-03 (3) Development of Abul Basher road by BC Starting from Miapara Mosque to Bokultola road, Ward-03, L=447, Wide 3.5m. (Ch. 0.00 to 447.0m.) (4) Construction work of RCC Drain & Road at Bakultola starting from DC road to old RCC Drain under Gopalganj'sPourashava.(ch00-160.0m). word no-03 0.7880 74.019 M/S. Nabiha Enterprise 74.019 10/09/2020 02/09/2021 100 27/09/2022 25.64% Less
14 UIIP-BC/PCO/W-08 (1) Construction of RCC road & Drain at Gohata bylane starting from Gohata road to Md Rafiqul Islam House L-52m, Wide-2.00m, W-05 (2) Construction of RCC road & Cross Drain Gohata Bottola starting from Gohata road Bottola to Narayan Chandra Biswas House, L-63m, Wide-2.05m, W-05 (3) Construction of HBB road at Shaplabag road bylane starting from Shaplabag Road to Teacher Collone Drain, L-195m, W-07 (4) Construction of RCC Drain at Lichubagan starting from Tekka House to Natun School Road Drain L-64.500 Word -7 (5) Construction of RCC road & RCC Drain at Teacher Colloni Road bylane starting from Teacher Colloni More to Ulka Apa House L-270m, W-07 (6) Construction of RCC road at Natun Bazar starting from Word Councilor Biplob vi House Corner toTahaz Molla House L-76m, Wide-2.05m, W-02 0.6560 90.510 M/S. Benojire Construction 90.510 10/09/2020 02/09/2021 100 27/09/2022 23.05% Less
15 UIIP-BC/PCO/W-07 (1) Construction of RCC road at Kalabagan starting from Kalabagan road (NearableAnowar Manager House) to Refaul Land L-66.00, Wide-3.00m, Word -1 (2) Construction of RCC road at Moulavipara starting from Mazor Mizanur house to Sha-AlamMolla House L-180m, W-01 (3) Construction of RCC & BSF road at Near Vagelar Math starting from In front of Mani Mia House to Fair Service Back side Road L-(93+40+47)=180m, W-01 (4) Construction & Improvement work of CC road at Moulovipara bylane road starting from Musa Molla house to Saha Alom Molla house & link road under Gopalganj's Pourashava.(ch00-333.0m),w-01 (5) Improvement work of CC road at Mouloviparabylane road starting from Shohel house to Bitu Councilor house & link road under Gopalganj's Pourashava.(ch00-260.0m),w-01 1.0190 95.157 M/S. Nabiha Enterprise 95.157 07/09/2021 100 27/09/2022 30.75% Less
2 Muksudpur
1 UIIP-BC/PCO/W-390 1 . Improvement of Golabaria Singboard-Vandaria road at CH 00 to 700m by 25mm Dense Carpeting W0rd No 09 Lenght 700m;2. Construction of Kamlapur-Dorika Dagga road at CH 00 to 670m by 25mm Dense Carpeting with ASS Word No 08. Lenght 670m;3. Construction of 4.50 X 4.50m RCC Box Culvert in Kamlapur-Dorika Dagga road near Harir Vuy Word No 08 in same road; 4. Construction of Dr.Boloram house road in Kamlapur Starting from Kamlapur Bus Stand to Muksudpur-Jalil par-Ujani road by RCC at Ch. 00 to 400m Word No 07 Length 400m 1.7700 157.136 M/S. Kamrul & Brothers 157.136 16/09/2021 16/09/2022 100 27/09/2022 0.59% Less
2 UIIP-BC/PCO/W-277 (1) Improvement of road by BC from Provakurdi Faruk Sheikh house to Naryan Member house word no-3 at Muksudpur paurashava Gopalganj's. L=660.00m.(2) Improvement of road by BC from Provakordi main road to Nobin Chondra road via Boro Bari Madrasha (word no-2) at Muksudpur paurashava, Gopalganj's. L=726.00m.(3) Improvement of road by BC from Bishow road to Nagar Sundordi Tushar Mia house word no-3 at Muksudpur paurashava Gopalganj's. L=460.00m.(4) Improvement of road by BC from Provakurdi main road to Tara mia house word no-2 at Muksudpur paurashava Gopalganj's. L=390.00m. 2.2360 131.949 M/S. Benojire Construction 131.949 09/11/2021 09/11/2021 46 27/09/2022 19.91% Less
3 UIIP-BC/PCO/W-276 (1) Improvement of road by BC from Provakordi Muslem Khandaker house to Mohiuddin house (word no-2) at Muksudpur paurashava, Gopalganj's. L=426.00m. (2) Improvement of road by BC Part-A: From Lakhayerchar Main BC road to Kalimondir, L= 150.00m. Part-B: From Lakhayerchar Main BC road to River Ghat, L= 650.00m (word no-01) at Muksudpur paurashava, Gopalganj's. Total Length = 800.00m. (3) Improvement of road by BC From Bisshow road Gopinathpur Sugom Madrasa (Word no-5) at Muksudpur paurashava, Gopalganj's. L=340.00m. 1.5660 123.920 M/S. Benojire Construction 123.920 09/11/2021 09/11/2022 86 27/09/2022 18.02% Less
4 UIIP-BC/PCO/W-275 (1) Improvement of road by RCC from Tangrakhola Khal Par road to Hunnan mia house word no-6 at Muksudpur paurashava Gopalganj's. L=510.00m.(2) Improvement of road by RCC from Komlapur Zahad mia house to Oli mollahs house word no-7 at Muksudpur paurashava Gopalganj's. L=200.00m. (3) Improvement of road by RCC from Komlapur Mozibur sarder house to komlapur Abdul hi house word no-8 at Muksudpur paurashava Gopalganj's. L=820.00m. (4) Improvement of road by RCC from Gopinathpur BC road near mamun shops to Munshi Bari (word no-5) at Muksudpur paurashava, Gopalganj's. L=150.00m. 1.6600 205.492 NISHIT-SHOWROVE JV 205.492 06/12/2021 06/12/2022 64 27/09/2022 13.59% Less
5 UIIP-BC/PCO/W-105 1. Improvement of road by BC from Komlapur khodakar Bazar Chand hat road to Baroy para Shaha bari Woard no-8 at Muksudpur Paurashava Gopalganj's. L=390.00m (2) Improvement of road by BC from Komlapur Whahed Fakir house to Hobu mia house via Hannan houseWoard no-7 at Muksudpur Paurashava Gopalganj's. L=210.00m. (3) Improvement of road by BC from Tangrakhola Battala road Rawshon mia house to khalper via Sobuj Mia & Akram Chowdhory House Woard no-6 at Muksudpur Paurashava Gopalganj's. L=513.00mand(4) Improvement of road by BC from Golabaria Sign Board R&H way to End of Paura Boundary Via Vandaria Mohammad Kha & Hobi Mollah house Woard no-9 at Muksudpur Paurashava Gopalganj's. L=600.00m 1.7130 130.756 M/S. Showrove Traders 130.756 19/09/2021 100 27/09/2022 14.00% Less (Final Bill Done)
6 UIIP-BC/PCO/W-104 1 Improvement of road by RCC from Gopinathpur X-Upazila Chairman House to Muksudpur Collage Woard no-5 at Muksudpur Paurashava Gopalganj's. L 450.00m.2 Improvement of road by RCC from Komlapur Year Ali house to Battala via South Para Jame Mosque Woard no-7 at Muksudpur Paurashava Gopalganj's. L 385.00m.3 Part-A Improvement of Road by RCC with RCC Drain from Chondibordi Ripon Kha house to Sorowar Khan house Woard no-4 at Muksudpur Paurashava Gopalganj's. L122.00m.-B Construction of RCC Drain from Sonali Bank to Fish Market via Samim Mollah House Woard no-4 at Muksudpur Paurashava Gopalganj's. L175.00m Total-L297.00m 0.8350 123.598 M/S. Showrove Traders 123.598 19/09/2021 100 27/09/2022 14.00% Less (Final Bill Done)
3 Tungipara
1 UIIP-PCO/BCO/W-488 (1) Construction RCC Road starting From (a) Sardarpara RHD main Road to Near the House of Mr. Mohammad Ali Fakir at Ward No-06 Ch0-70 (b) Sardarpara RHD Main Road to Near the House of Mr. Golam Rosul via Mr. Lotif House With Retaining Wall & 3 Nos Link Road at Ward No-06 Under Tungipara Pourashava Dist: Gopalganj's Ch 0-180m Total Length (70+180)=250m. (2) Construction RCC Road starting From (a) Patgati Kitchen Market Road to Patgati Animal Yard of length 165.00m (b) Patgati Kitchen Market Road near The House of Mr. Robiul upto patgati Animal Yard at Ward No-09 of Length 46.00m Under Tungipara Pourashava Dist: Gopalganj's Total Length=211.00m 0.4610 127.801 Md. Babul sheikh 127.801 15/06/2022 11/06/2023 0 27/09/2022 4.93% Above.
2 UIIP-PCO/BCO/W-487 (1) Construction RCC Drain starting From Patgati Sadarpara beside the Mr. Billal Hossain house to RDH By Pass Road Side Khal at Ward No-07 Under Tungipara Pourashava Dist: Gopalganj's (Main Drain 220m Link 120m) Total Length 340.00m (2) Construction RCC Drain starting From Infront of Patgati Bottola Mondir To Patgati Khal With RDH Crossing at Ward No-09 Under Tungipara Pourashava Dist: Gopalganj's (Main Drain 105m Cross 2nos (20+25=45) Total Length 150.00m. 136.609 M/S. S.S Traders 136.609 11/06/2023 0 27/09/2022 4.84% Above.
3 UIIP-PCO/BCO/W-06 1. Construction of H.B.B Road Starting from Sheikh Hasina Gate to modhumoti River Ghat With Animal Yard at ward no-09 under Tungipara Paurashava.(L=460.00m) 2. Construction of H.B.B Road Starting from New Bus Terminal New gate to RHD Akkas Saw Mill Raod at ward no-09 under Tungipara Paurashava, L=180m. 0.6400 112.410 Md. Babul sheikh 112.410 09/12/2020 08/11/2021 100 27/09/2022 27.50% Less
4 UIIP-PCO/BCO/W-05 Part -A: Construction of RCC Drain Starting from Tungipara poura Water plant Vaia Mr. Asarot/ Kinar Molla House to Baghin River at Word no-03. Part -B : Construction of RCC Drain Starting from Purbo Tungipara Billal Molla House side Baghia River at Word No-03 Under Tungipar pourashava. Gopalgang ch. 00-215m. 53.777 Md. Babul sheikh 53.777 09/12/2020 30/03/2022 100 27/09/2022 28.44% Less (Time Extended)
5 UIIP-PCO/BCO/W-04 Part 01. Construction of RCC Road Starting from Patgati old Bus-stand Road via Manik Mia super Murket upto Modhumati Clinic Via Joglul House at Word no-08 ( Ch. 0.0 to Ch. 289.00 m ) ( L= 289.00 m ) Part 02 . Reabilitation of Road by RCC Starting from Sheikh Salim House to Gubtola Bridge at Ward no-05 Under Tungipara Pourashava (L=165m). 0.4540 74.964 M/S. Monir Traders 74.964 09/12/2020 08/11/2021 100 27/09/2022 27.50% Less
6 UIIP-PCO/BCO/W-03 Contruction RCC Drain Starting from Kazi Eyad Ali House to House of Mr. Babul Master at Ward no-05 Under TungiparaPourashava Gopalganj's. Ch0.00-195.000m Contruction RCC Drain Starting from Kazi Anower House to Gimadangi Khal at Keraikopa Ward No 02 Under Tungipara Pourashava Gopalganj's. Ch0.00-115.000m Contruction RCC Drain Starting from Kazi Deloar Brother House to House of Kazi Anower at Keraikopa Wadr No-02 Under Tungipara Pourashava Gopalganj's. Ch0.00-120.000m Contruction RCC Drain Starting from Kurdus Sheikh House to Tungipara Khal at Ward No-05 Under Tungipara Pourashava Gopalganj's. Ch0.00-50.000m. Construction of RCC Drain Starting from Sheikh Buranuddin House upto Sheikh Kabir Sir at Tungipara Under Tungipara Paurashava Gopalganj's. Ch 0.00-60.00m” 131.259 Md. Babul sheikh 131.259 09/12/2020 30/03/2022 95 27/09/2022 25.08% Less
7 UIIP-PCO/BCO/W-02 Construction of RCC Drain Starting from the End of CCTF RCC Drain in front of Milk vita Store by the side of Patgati Main Road upto RHD Tungipara-Gopalganj's Main Road Near by Modumoti Counter at Ward no-08 Under Tungipara Pourashava Gopalganj's. Drain Ch0-310.00m. 77.003 Md. Babul sheikh 77.003 30/03/2022 96 27/09/2022 25.49% Less (Time Extended)
8 UIIP-PCO/BCO/W-01 A. Construction of RCC Road Startingfrom 2 No Gate Mausoleum RHD Road Near the House of Mr.Juber Sheikh to H/O Mr. Chalim Miah at Sardarpara Under Tungipara Pourashava Gopalganj's. Road Ch 00-320.00m B Construction of RCC Road Starting from Sarder at Near theHouse of Mr. Rakib Sheikh to H/O Mr. Rabiul Miah atSarderpara at Aard No-06 Under Tungipara PourashavaGopalganj's Road ch 0-200.00m A. Construction of RCC Road Startingfrom Kerailkopa Main Road to H/O Kazi Dulal at KerailkopaUnder Tungipara Pourashava Gopalganj's. Road Ch 00-120.00m B. Construction of RCC Road Starting from Kerailkopa Main. Road to H/O Kazi Azad Hossain at Kerailkopa UnderTungipara Pourashava Gopalganj's. Road Ch 00-60.00m C Construction of RCC Road Starting from 2 No Gate RHD toH/O Mr. Mahabub Hossain at Sardarpara Under TungiparaPourashava Gopalganj's. Road Ch 00-60.00m. D Construction of RCC Road Starting from Patgati Main to Patgati Jame Mosquest at Patgati Under TungiparaPourashava Gopalganj's. Road Ch 00-70.00m. 0.8300 94.252 Md. Babul sheikh 94.252 10/09/2020 02/09/2021 100 27/09/2022 27.36% Less
Total : 23.4129 (Km) 2898.99 (Lac) 2898.99 (Lac)