Project Scheme Detail List
SL No. Package No. Name Length (Km) Allotment (Lac) Name of Contractor Contract Amount (Lac) Date of Commencement Date of Completion Physical Progress (%) Date of Progress Update Remarks
1 Alfadanga
1 UIIP-BC/PCO/W-472 A) Construction of Shed for Public Transport Passenger (28.00 sqm) ‍At Alfadanga local Bus Stand under Alfadanga Pourashava Faridpur.B) Construction of One Storied Public Toilet (Type A=56 sqm) at Alfadanga Bazer Dok Market under Alfadanga Pourashava Faridpur.C) Construction of One Storied Vegetables & Agricultural Products Market of 5 Storied Foundation (Floor Area=314 sqm) at Alfadanga Old Union Parishod under Alfadanga Pourashava Faridpur. 152.742 M/S. Kochi Enterprise- ACL (JV) 152.742 16/05/2023 0 27/09/2022 0.59% Less
2 UIIP-BC/PCO/W-290 (A) Improvement of BC road near T&T mhor to Sirirampur Kasem mia house via upazila auditoriam ch.0.00 - 435.00m with 02 link road Leangth 442m. Woard no. 02 . Under Alfadanga Pourashava,Dist - Faridpur Total Leangth 877 m.(B) Improvement of BC road starting from Mithapur Nodir Beri BC road to Mithapur Mukammel Hosen Motuk Khalashi House Via college road ch. 0.00-400.00m under Alfadanga Pourashava, Dist.- Faridpur(C) Improvement of BC road Starting from Mithapur Madrasha to Mithapur-Jatikgram BC road via Monnur House Ch. 0.00-715.00m and three 3 no. U Drain/Cross Drain at chainage 270.00m-440.00m & ch. 700m at Woard no. 09 Under Alfadanga Pourashava, Dist.- Faridpur(D) Improvement of BC Road Starting from Alfadanga Kasiani BC Road near Vhor Kusumdi Rejul Shop to Echapasha Moddo-Para BC road Near Hobi Munshi Shop Ch. 0.00-265.00m with one 01 Link road Vhor Kusumdi daud House to Zakir House Khal par Road ch.0.00-290.00m woard no.-05 &06 under Alfadanga pourashava, Dist.- Faridpur.(E) Improvement of BC road starting from Alfadanga Kasiani BC road Near Echapasa Bridge to Vhor Kusumdi Akter Hossain House Khal par road ch. 0.00-370.00m at woard no. 06 under Alfadanga Pourashava, Dist.- Faridpur 1.9920 279.108 M/s. Kochi Enterprise-ACL (JV) 279.108 25/09/2022 100 27/09/2022 14.68% Less
3 UIIP-BC/PCO/W-258 (a).Improvement of road side R.C.C drain of Alfadanga College road starting from Bazar Chourasta to Kusumdi Khal Ch.0.00-515.00m at ward no.07&08. (b)Improvement of road side R.C.C drain of Kali Babu Road starting from College road Cualisher Mhor to Totamia house Ch.0.00-412.00m with 01one Link road Ch.0.00-130.00m at ward no.07&08 Under Alfadanga Pourashava Faridpur. 243.331 M/S. Kochi Enterprise- ACL (JV) 243.331 02/02/2021 02/01/2022 100 27/09/2022 13.17% Less
4 UIIP-BC/PCO/W-257 (a)Improvement of B.C road starting from Alfadanga-Kashiani B.C Road Near Aynuddin Munshi Mhor to Kusumdi Kali-Mondir B.C road remaining part Ch.0.00-600.00 M at ward no.06 of Alfadanga Pourashava Dist: Faridpur.(b)Improvement of B.C Road Starting from Bacail-Nagarkanda B.C Road Near Miraj House to Kuciagram B.C Road Via Kuchiagram Govt. Primary School Ch.0.00-1180.00m with link road Ch.0.00-40.00m at ward no.03 under Alfadanga Pourashava Dist: Faridpur.(c)Improvement of B.C Road Starting from Alfadanga-Kuchagram B.C road Near Nowapara Delower house to Bacail-Nagarkanda B.C road Via west Nowapara Jame Mosjid Ch.0.00-500.00m With link road Ch.0.00-120.00m at ward no.04 under Alfadanga Pourashava Dist: Faridpur. 2.4400 216.993 M/S Samia Enterprise, Pro:Shah Muhammad Emar Hoque. 216.993 02/02/2021 01/02/2022 100 27/09/2022 0.93% Less
5 UIIP-BC/PCO/W-35 A) Improvement of B.C Road Starting from Mithapur Battola B.C Road Nodir beri road to Mithapur Talukder para B.C road Near Raza sikder house Ch.0.00-1885.00m at ward no.09 of alfadanga pourashava faridpur.B) Improvement of B.C Road Starting from Buraich Nodir beri B.C Road Near Tara mia Shop to Hidadanga B.C Road Near Hidadanga Sluice gate Ch.0.00-850.00m With 2 two link road at ward no.01 of alfadanga pourashava faridpur.C) Improvement of R.C.C road starting from Alfadanga Upazila road near central Jame Mosque to Alfadanga Kuchiagram B.C road near Aunirban school Ch.0.00-368.00m at ward no. 07 of Alfadanga Pourashava Dist Faridpur 3.0800 301.938 M/S. Kochi Enterprise- ACL (JV) 301.938 29/07/2021 100 27/09/2022 0.50% Less
2 Bhanga
1 UIIP-BC/PCO/W-307 Detail Estimate for the RCC Drain Starting from West Side of Bhanga Upazila Complex to Jelepara Culvert Ch. 0.00-450.00m (B) 2 nos Cross Drain (30.00+30.00) =60.00m Total Length = 510.00m 90.031 Mesarso Mehedi enterprise Pro. Zakir Hossen 90.031 25/04/2022 65 27/09/2022 17.92% Less
2 UIIP-BC/PCO/W-306 1.Kuthibari Charkanda BC Road via H/O Dr. Rezaul Korim to west Hasamdi Ch. 0.00-500.00m 2.Detail Estimate for the RCC Road Starting from BC road to H/O Md. Baccu x-Councillor atNowpara Ch. 0.0-80 003. Detail Estimate for the RCC Road Starting from BC road to H/OFerodous at Gozari Ch. 0.00-30.00m 4. Detauk Estimate for the RCC road Starting form BC road toH/O Goffar Masud at kuthibari Ch 0.00-197.00m 5. Detail Estimate for the RCC Road Startingfrom BC Road to H/O Biplob at Kuthibari Ch.0.00-90.00m 6. Detail Estimate for the RCC RoadStarting form BC road to H/O Zahangir Vender at Kuthibari Ch.0.00-55.00m 7. Detail Estimate forthe RCC Road Starting BC Road to Razib Monshi Near Toli Hospital at Bhanga Bazar Ch.0.00-106.00m 8. Detail Estimate for the RCC Road Starting from BC Road to H/O Sahin Sultan atBhanga Bazar Ch.0.00-120.00m 9. Detail Estimate for the RCC Road Starting from BC Road toH/O Ishaq Molla at Varoidanga Ch0.00-241.00m 10. Detail Estimate for the RCC Road Startingfrom BC Road to H/O Nazurl at Atadi Ch.0.00-37.00m(Reject) 11. Detail Estimate for the RCC RoadStarting from BC Road to H/O Alomgir vender at Atadi Modhopara Ch0.00-120.00m 12. DetailEstimate for the RCC Road Starting from BC Road to H/O Sattar at Kuthibari Ch0.00-220.00m 1.7960 246.436 Mesarso Mehedi enterprise Pro. Zakir Hossen 246.436 25/04/2022 80 27/09/2022 19.10% Less
3 UIIP-BC/PCO/W-193 (1) Omit Chowdhory to H/O Alok Chowdhory Ch:00-80.00m (2) Chilladharchar RCC Road Govt.Primary School to H/O Babu Bari Ghat Ch:00-170.00m (3) RCC road Starting from Govt.Godown to H/O Bimol Ch:00-40.00m (4) RCC road starting form BC to H/O Abul Kalam(xCouncillor) Ch;00-145.00m (5) RCC road starting from In front of BRACK BANK at Bhanga Bazar Ch:00-70.00m withRCC Drain Length= 90.00m 0.5050 64.271 Mehedi Enterprise 64.271 22/09/2021 100 27/09/2022 15.378% Less
4 UIIP-BC/PCO/W-192 (1) Darier math BC road From the H/O Kawser Matubbar to H/O Inuddin Daroga Ch:00-830.00m with Link (To the H/O x Councillor ) Abutaleb Ch: 00-50.00m ) Total Length =880.00m (2) Nowpara BC road to H/O Afsar Fakir Ch:00-90.00m (3) Nowpara (Link road ) BC road to H/O Mr.Tara mirza Ch:00-25.00m (4) Nowpara BC road to H/O Mr.Ebrahim Ch:00-38.00m(Reject) (5) Gozana BC road to gozaria mosque Ch:00-65.00m( Reject) (6) Mowpara BC road to graveyeard (Near H/O Ad.Johurul) Ch:00-45.00m,) (7) Nowpara (Mirza bari) BC road to BC road Ch:00-188.00m (8) Nowpara (Link road) BFS road to H/O Mr.Bablu Ch;00-18.00m,) (9) Kapuriasadardi BC road to H/O Mr.Alamgir Sikder Ch:00-155.00m, 10) Kapuriasdardi BC road to H/O Army Forhad Ch:00-135.00m Total Length= 1639.00m. 2.0740 167.083 Mehedi Enterprise 167.083 22/09/2021 80 27/09/2022 13.61% Less, Scheme 4 cancelled
5 UIIP-BC/PCO/W-191 (1) Koidobi BC road to H/O Kulsum Begum Ch:00-75.00m. (2) Hogladangi BC road to H/O Mr. Liakot Mollal Ch:00-80.00m. Detail Estimate for the RCC road starting from 3. hogladangi BC road to H/O Mr.Youns Chakderl Ch:00-210.00m (4) hogladangi BC road to H/O Mr. Uzzal & Zaker Molla Ch;00-80.00m (5) Bastokhola BC road to H/O Serajmirdha Ch:00-136.00m (6) Bastokhola BC road to H/O SK Sadek Ali Ch:00-28.00m (7) Chiladharchar BC road to H/O Hazi Hader Ch:00-65.00m (8) Bastokhola BC road to H/O Balam Mirdha Ch:00-65.00m (9) Bastokhola BC road to H/O SK Sorat Ch.00-31.00m (10) Bastokhola BC road to Bastokhola BC Ch:00-135.00m (11) Childharchar BC road to H/O Samim Fakir ChL00-25.00m (12) Chiladharchar BC road to H/O Jalal Kha Mosque Ch.00-45.00m (13) Childharchar BC road to H/O Asgor Ch:00-25.00m (14) Detail Estimate for the RCC Drain Starting from BC road to River at Kapuria Sadardi near House Rezaul Bishas ( Drain Length-75.00m) 1.0000 111.201 Mehedi Enterprise 111.201 22/09/2021 100 27/09/2022 20.88% Less
6 UIIP-BC/PCO/W-56 (1) Chondidashdi BC to H/O Khitish. Ch,00-35.0m, (2) Chondidashdi BC to H/O Sonjoy, ch,00-36.0m, (3) Chondidashdi BC to H/O Abdul Baki Monshi,ch,00-35.0m, (4) Chondidashdi BC to H/O Sonjoy Samol Bhowmik,ch, 00-25.0m., (5) Chondidashdi BC to H/O Abul Basher, ch,00-40.0m., (6) Chondidashdi BC to H/O Moti Molla, ch 00-30.0m (7) Chondidashdi BC to H/O Sadhin Sarkar, Ch ,00-30.0m, (8) Chondidashdi BC to H/O Kalipodo sarker,ch, 00-50.0m., (9) Chondidashdi BC to H/O Dipok Sarkar, Ch,00-36.0m (10) Chondidashdi BC to H/O Bimol Sarkar (mondir), Ch, 00-47.0m., (11) Chondidashdi BC to H/O Uzzal master, ch, 00-60.0m., (12) Chondidashdi BC to H/O Abu Alam , Ch. 00-65.0m, (13) Chondidashdi BC to H/O Nannu Monshi, ch, 00-60.0m, (14) Chondidashdi BC to H/O Sadek Monshi Ch, 00-30.0m, (15) Chondidashdi BC to H/O Bachu, ch. 00.51.0m, (16) Chondidashdi BC to H/O Kalam Bepary ch, 00-50.0m, (17) Chondidashdi BC to H/O Fazlul Haque, ch, 00-50.0m. (18) Chondidashdi BC to H/O Mohor Ali, Ch, 00-50.0m, (19) Chondidashdi BC to H/O Rostom Beparyi, Ch, 00-45.0m (20) Chondidashdi BC to H/O Akter, ch, 00-60.0m, (21) Dariarmath I BC to H/O Rashid, Ch, 00-30.0m, (22) Chondidashdi BC to H/O Monobindro ch, 00-41.0m (1) Koidobi BC road to H/O Kulsum Begum Ch:00-75.00m. 0.9410 103.145 M/S Mehedi Enterprise 103.145 22/10/2021 100 27/09/2022 17.10% Less
7 UIIP-BC/PCO/W-55 (1) Atadi BC to H/O Salam Moulana Ch, 00-100.0m., (2) East Hasamdia BC to H/O Riroz firoz sheikh ch. 00-90.0m, (ch.00-88m)(3) East Hasamdia BC to H/O Khaque Master ch, 00-90.0m(ch.00-54m)(4) East Hasamdia BC to H/O Montu, ch, 00-115.0m, (ch.00-117m)(5) East Hasamdia BC to H/O Mannan Master, ch, 00-135.0m, (ch.00-33m)(7) Atadi BC to H/O Zahangir Lashkar, ch. 00-60.0m, (ch.00-61m)(9) Atadi BC to H/O Forhad Mia, ch 00-45.0m,(ch.00-190m) (12) Atadi BC to H/O Abdul Aziz ch, 00-38.0m, (ch.00-49.50m)13)Atadi BC to H/O Add Khaled ch. 00-120m.(ch.00-121m) 0.7330 106.956 Mehedi Enterprise 106.956 22/10/2021 100 27/09/2022 19.00% Less
8 UIIP-BC/PCO/W-54 (1) Hoglakandi BC road to H/O Samad Bishwas. Ch; 00-105.0m (2) H oglakandi BC road to H/O K abir Khandakar. ch; 00-45.0m (3) H oglakandi BC road to H /O M ohi Sarif. ch; 00-110.0m (4) Hoglakandi BC road to H/O M into. ch; 00-93.0m(5) H oglakandi BC road to H/O Harun matubbar. ch; 00-50.0m (6) Hoglakandi BC road to H/O Botu- Khandakar.ch;00-55.0m (7) Baishakhali BC to H/O billal. ch: 00-85.0m (8) Baishakhali BC to H/O O m ar H annan ch;0D-l 00.0m (9) Kuthibari BC to H/O Helon ch;00-135.0m. (10) RCC road starting from BC to BC at K27M College Cam pus ch; 00-52.0m (11) RCC road starting from Hogladangi BC to Tohsilder H ouse ch;00-85.0m. (12) from Varoidanga RCC road to H/O Serajul Islam, ch; 00-31.0in Total Length=946.00m. Tender ID- 504950 0.8090 114.964 M/S MAK-MME (JVC) 114.964 07/02/2021 08/02/2022 100 27/09/2022 0.21% Less
3 Faridpur-s
1 UIIP-BC/PCO/W-366 (A) Construction of RCC Drain Starting From Shingpar Rakhal Dr. Road to Kumar River Ch.0.00-395.0m Under Faridpur Pourashava. (B) Construction of RCC Road Starting From Shingpar Rakhal Dr. Road to Kumar River Ch.0.00-355.0m Under Faridpur Pourashava. (C) Construction of RCC Road Starting From 01 No Road to Abul Driver House Ch:0.00-180.00 Under Faridpur Pourashava. (D) Construction of BC Road Starting From 01 No Road Babri Mosque to Nurumia by pass Road Ch:950.00-1252.0m Under Faridpur Pourashava. (E)Construction of RCC Cross Drain Starting from Wapda Godown Road (Near Rathkhola) Length=8.00m Under Faridpur Pourashava. (F)Construction of RCC Road Starting fromAlipur Town Embankment Road (Bedea Para) to Rail Line Ch:0.00-234.00m Under Faridpur Pourashava. (G) Construction of RCC Drain Starting From Wearlesspara Chairman Hakim Mia House to Kumar River.Ch:0.00-402.0m. Under Faridpur Pourashava. (H) Construction of RCC Drain Starting From Management College (Housing State) to Mr. jamal pond ad Housing state main road to A Block.Ch:0.00-160.00m Under Faridpur Pourashava. (I)Construction of RCC Cross Drain Starting from Madha Alipur Road (Infront of Khonika Building) Length=8.00m Under Faridpur Pourashava. 1.0710 265.953 Md. Saidur Rahman 265.953 02/12/2021 24/11/2022 0 27/09/2022 11.73% Less (work delay due to contractor sickness)
2 UIIP-BC/PCO/W-365 (A) Construction of RCC Road Starting From RHD to Kaharpara Road Ch.0.00-90.0m Under Faridpur Pourashava. (B) Construction of RCC Drain Starting From Debdas House to Charkamlapur Drain (Anather More) Under Faridpur Pourashava. Ch:0.00-140.00m (C) Re-Construction of BC Road Starting From Tepakhola Bazar to Sluice Gate (Munshi Bari Road) Under Faridpur Pourashava.Ch: 0.00-503.00m (D) Construction of RCC Road Starting From RHD to Shishu park Pond Ch:0.00-176.0 Under Faridpur Pourashava. (E) Construction of RCC Road Starting From Mosjidbari Road to Mr. Abdullah House.Ch:0.00-86.0m Under Faridpur Pourashava. (F)Construction of RCC Cross Drain Starting from Kobi Jossimuddin Road (Near Khakpir House) Length=22m, Under Faridpur Pourashava. (G) Construction of RCC Drain Starting From RHD to Shishupark pond Under Faridpur Pourashava.Ch:0.00-136.00m. Under Faridpur Pourashava. (H) Construction of HBB Road Starting Faridpur Chorvodrason Road to Nawab Ali House Under Faridpur Pourashava.Ch:0.00-425.00m (I) Re-Construction of BC Road Starting From Vatilokkhipur Shoid Minar to RHD Under Faridpur Pourashava.Ch:0.00-440.0m (J) Construction of RCC Road Starting From Alipur Bapari Bari Road to Shofi Masters House Under Faridpur Pourashava.Ch:0.00-174.00m (K) Construction of RCC Cross Drain Starting DIB Bottola (infront of Bornomala Building) Length= 9.00m Under Faridpur Pourashava. (L)Construction of RCC Cross Drain Starting From Thana Road (Infront of Masranga shopping mall) Length=9.00m Under Faridpur Pourashava. (M)Construction of RCC Cross Drain Starting From Dhopa Bari Road (Infront of Abdul Halim Mia House) Length=9.00m Under Faridpur Pourashava. (N)Construction of RCC Drain Starting From (i)Shantibag Road(Dr. Faruk House to shahabuddin House (ii) Emagbag Road to Kumar River (i+ii)=190.00m+197.00m=387.00m. Ch:387.00m Under Faridpur Pourashava. 1.8940 281.764 Ajam Construction LTD. 281.764 20/11/2022 98 27/09/2022 16.68% Less
3 UIIP-BC/PCO/W-158 a) Estimate for Construction of R. C.C Road With R.C.C Drain Starting from Char Kamlapur Jora Bridge Munshi Bari Road to Madrasha Under Faridpur Paurashava. CH 00.00-320.00 M b)Estimate for Construction of B.C Road Starting From Parchar Baribadh to Shahid Kabiraj House Under Faridpur Paurashava. CH 00.00-408.00m (c)Estimate for R.C.C Road Starting From Ali Pur Yeasin Road to Barek Sheikh Road CH 00.00-322.00 , Width =3.00 M Under Faridpur Paurashava. (d)Estimate for Construction of B.C Road Starting From Parchar Baribadh to Parchar Barai Bari to Matilal Kintar Gurden School Under Faridpur Paurashava. CH 00.00-860.00 m (e)Estimate for Bdamtoli Road Starting From Badamtoli bridge to Pial House to Forid Mollah House CH 00.00-334.00 , Width =3.50 M Under Faridpur Paurashava. 2.2440 265.063 Faridpur Jannat Construction Ltd. 265.063 12/10/2020 04/10/2021 75 27/09/2022 0.06% Less
4 UIIP-BC/PCO/W-122 ( a) Estimate For Improvement of Bonik Bari Road starting from Kobi Jossaimuddin Road to Town Embanment road By B.C Under Faridpur Paurashava. CH 00-00-1070.00 m ( b)Estimate for R.C.C Road Starting From North Bill Mahamudpur High School Bridge to Kholifa Bari Mosque Under Faridpur Paurashava. CH 00.00- 510.00 , Width =3.00 M ( c) Estimate for Construction of B.C Road Starting From RHD to Sukumar House at Badarpur Under Faridpur Paurashava. CH 00.00-320.00 m (d)Estimate for Construction of H.B.B Road Starting From RHD (Khanpura Mill/Sunny Filing Station) to Moulavibari Road (Amzad House) Under Faridpur Paurashava. CH 00.00-680.00 M,Width=3.00 M 2.5800 187.570 Tasa Construction LTD. 187.570 12/10/2020 04/10/2021 100 27/09/2022 0.21% less
5 UIIP-BC/PCO/W-121 (1) (a)Estimate for Improvement Work of Major Tofayel Road Starting From Faridpur DC Office to Tapakhola Cattle Market By B.C Under Faridpur Paurashava. CH 00.00-350.00 m , CH 2120.00-2320.00, Total =550.00 m (b) Estimate for Improvement Work of Major Tofayel Road Starting From Faridpur DC Office to Tapakhola Cattle Market By B.C Under Faridpur Paurashava. CH 350.00-2120.00 m(1770.00 m). (2) Estimate for R.C.C Road Starting From (a) RHD to Mollah Bari Sarak (Khorshed Vuhyan Road) CH 00.00- 225.00, Width =4.00 M (b) RHD to Somobay Office (Chowdhuri Bari Road) CH 00.00-350.00 , Width =3.50 M Under Faridpur Paurashava. Total =(CH 225.00 M+350.00)=575.00 m 2.8950 238.694 Faridpur Jannat Construction Ltd. 238.694 12/10/2020 04/10/2021 100 27/09/2022 0.19% Less
4 Madhukhali
1 UIIP-BC/PCO/W-285 Construction of RCC drain at West Garakhola from Boushakhi Mela Math to Chandona river at ward no 04 & 05 under Madhukhali Pourashava FY 2019-2020. Total Length 730.00m 233.897 Ajam Construction Ltd. 233.897 12/10/2021 04/10/2022 25 27/09/2022 22.26% Less
2 UIIP-BC/PCO/W-284 (A). improvement of B.C road at Dhaka-Khulna highway from Zela Parishad pont to Porikhitpur Tara Mia house via Lokman Khan house at ward no o8 Ch 0.00m- Ch 1200.00m(B ).Improvement of B.C Road at Nowapara More from Madhupur Bottola to Purator Kamarkhali Rail Line at ward no 03 Ch 0.00m- Ch 450.00m(C). Improvement of B.C road at Khatal Baru Mohisapur from oleman Molla house to Moyan Uddin house Ch 0.00m – Ch 312.00 m at ward no 01 . 1.9620 139.478 Golam Munsur Nannu 139.478 18/11/2021 21/11/2022 60 27/09/2022 1.45% Less
3 UIIP-BC/PCO/W-127 A) Improvement of BC road at Sreepur from Noba Mir Shop to Rafik Doctor house at ward no. 06 ch.0.00m- ch. 1005.00mUnder Madhukhali Pourshava, B) Improvement of BC road at Dhaka-Khulna Highway from Banglalink Tower to Bonamalidia Abdur Rashid house ch.0.00m- ch. 500.00m at ward no.08., Under Madhukhali Pourashava 1.5050 105.778 Golam Munsur Nannu 105.778 26/12/2021 100 27/09/2022 18.10% Less
4 UIIP-BC/PCO/W-86 A) Improvement of B.C road at Sreepur from Sah Mondol house to Shek bari Jame Mosjid at ward no 06 (ch 0.00m- ch 1100m) under Madhukhali Pourashava.B) Improvement of B.C road at Gondardia from Sah Md Faruk (Sanbadik) house to Sumon house at ward no 03 (ch 0.00m-ch 700.00m) under Madhukhali Pourashava. 1.1100 167.782 Golam Munsur Nannu 167.782 21/12/2021 100 27/09/2022 18.10% Less
Total : 30.6310 (Km) 4084.18 (Lac) 4084.18 (Lac)