Project Scheme Detail List
SL No. Package No. Name Length (Km) Allotment (Lac) Name of Contractor Contract Amount (Lac) Date of Commencement Date of Completion Physical Progress (%) Date of Progress Update Remarks
1 Abhoynagar
1 UIIP-BC/PCO/W-612 Construction of Public Transport Passenger Shed (28.00sqm) at Bhanga Gate Bazar in Word No-01 Under Nowapara Pourashava. Construction of Public Transport Passenger Shed (28.00sqm) at Rajghat Bus Stand in Word No-08 Under Nowapara Pourashava. 27.990 27.990 0 18/11/2024
2 UIIP/PCO/G-63 Implelemtation of 500.00 nos Waste Basket 920 ltr) & 26 nos Non-motorized vehicle (van) under Noapara Pourashava District: Jashore. 39.790 RFL Plastics Limited 39.790 20/02/2024 20/05/2024 90 18/11/2024
3 UIIP-BC/PCO/W-609 1. Improvement of BC Road from Dhopadi Ulu Bottala to Dhopadi Charatala Road Via Nurani Madrasha at Ch. 0+00-1+886= 1886.00m at Ward No:03 Under Nowapara Pourashava. 2. Improvement of BC Road from Nowapara College Road to Buikara Govt. Primary School at Ch.0+00-0+946.00m at Ward No- 06 & 07 Under Nowapara Pourashava. "3.  Improvement of Buinkara Purabari BC Road Ch.0+00-0+646.00m and Link 01: Buinkara Sahadat House to Imran House side Road (Purabari) at Ch. 0.00-196.00m at Ward No:05 Under Nowapara Pourashava and Palisading work at (a) Samsul Haque Road at Ch. 0+400-0+430 (L/S) & Ch.0+400-0+420 (R/S) (b) Ekterpur Jamader Bari Road at Ch.00-25.00 (R/S) (C) Gazipur Buri Hattola Ch.390.00-415.00(R/S) (Total Salvaged Amount=20,46,075.00 for Package)" 3.4780 296.055 Nishit Bosu 296.055 28/08/2023 27/08/2024 99 18/11/2024
4 UIIP-BC /PCO/W-373 (1) Improvement of road by BC from Jashore-Khulna Road to Nowapara Cement Mill Via Uttara Group Under Nowapara Pourashava,ch0+00-0+350.00=350.00m out of Ch 900.00m (2)Construction of 2 (Two) Nos RCC road Cross Box Culvert ch 05m & ch 270m Near Uttora Group of Nowapara HimaloyCement millroad size 12.00x1.00x1.600. (3)Improvement of BC Road from Nowapara Mini Bazar to Rupsha Poltry Road Ch0+00-0+440m.Out of Ch580.00m.Ward no-04 (4) Construction of 1 One Nos RCC Cross Drain Size -6.00x1.00x1.00 At Ch 02m.At BC Road from Nowapara Mini Bazar to Rupsha Poltry Road. (5)Improvemnt of Road by BC from Pond of Mrs. Kala Buri to Maha Sashan Road at Kabiraj Paara Under Nowapara Pourashava,ch0+00-0+580.00m Ward No-02. (6)Construction of 2 (Two) Nos RCC road Cross Drain from Pond of Mrs. Kala Buri to Maha Sashan Road at Kabiraj Para Size -6.00x1.00x1.00 at Ch 02m & Ch 577m Under Nowapara Pourashava Ward No-02. (7)Construction of 1 (one) Nos RCC road cross Box Culvert at By pass Road Near Shop of Mr.Raihan CRDP/W-1 Under Nowapara Pourashava Size-10.00x1.000x2.000. (8) Construction of RCC Drain cum Footpath of Mohila College and Girls School area at Guakhula at Ch 01) 0+00-0+210m, 02)0+00-0+071m, 03)0+00-0+035m 05)0+00-0+045m under Nowapara Pourashava. 1.3700 246.612 M/S. SAIFUL HASAN JOARDAR 246.612 04/08/2022 03/08/2023 96 18/11/2024
5 UIIP-BC /PCO/W-372 (1) Improvement of Hospital Road by lane by RCC from Nowapara Puls Clinic to H/o. Mr. Harun/ Sahana Bilash C h 0+000-0+340m.out of 450m.Ward No-05. (2 )Construction of RCC drain by the side of Hospital road from Nowapara Puls Clinic to H/o. Sahana Bilash Ch 0+000-0+340m.out of 450m.Ward No-05. (3)Construction of 4 (Four) Nos RCC road Cross Drain Type-E size- 3.00mx0.400x0.600 at Ch 0+05m, 0+195m,0+300m & 0+335m of Hospital road from Nowapara Puls Clinic to H/o. Sahana Bilash Ward No-05. (4)Construction of 2 (Two) Nos 12m RCC road Cross Box Culvert at Entry of Nowapara Rail Station In and Out Size-1.600x1.600. (5) Construction of RCC Drain cum Footpath at Clinic Para from H/o. Mr.Modesser to Hospital road via H/o.Mst.Morzina and H/o Mr. Monju Ch 01) 0+00-0+131m, 2)0+00-0+031m 03) 0+00-0+020m. (6)Construction of RCC Drain from S/o. MARCEL Show Room to H/o.Mr.Dulu at Ch 0+00-0+170m. (7) Improvement of RCC road From S/o.MARCEL Showroom to H/o. Mr.Dulu at Ch 0+00-0+110m. (8) Improvement of Peer Bari Majar to Jashore-Khulna road Via Abhaynagar Upozilla Office at Ch 0+00-0+660m Ward No-06. (9) Construction of RCC Drain by the side of Peer Bari Majar to Jashore-Khulna road Via Abhaynagar Upozilla Office at Ch 0+00-0+660m Ward no-06 (10) Improvement of RCC road from Jashore-Khulna road to H/o.Mr.Mustain via Mr. Kosi Huzur at Ch 0+00-0+150m. (11) Construction of RCC Drain from Jashore-Khulna road to Southern School via H/o Mr. Mustain and Mr.Kosi Huzur at Ch 0+00-0+200m (12) Construction of RCC Drain from H/o.Mr. Musa to Bypass road Via H/o.Mr. Goutom at Ch 0+00-0+160m (13 )Construction of 1 One RCC Box Culvert at Bypass road Near H/o.Mr. Goutom Size 10.00x1.00x1.600 under Nowapara Pourashava. 1.2600 291.400 M/S. SAIFUL HASAN JOARDAR 291.400 04/08/2022 03/08/2023 84 18/11/2024
6 UIIP-BC/B25:B31PCO/W-195 (1) Improvement of BC road from Taltola Jamader Bari LGED Road to H/o. Siddique at Ekterpur under Nowapara Paurashava at Ch 0+000-0+310m. (2) Improvement of By pass road from Model School to H/o. Mr. Aslam under Nowapara Paurashava at ch 0+000-0+475m ward No-06. (3) Improvement of BC Road road from Koila Ghate School to Ropsha Poltri road under Nowapara Paurashava at Ch 0+000-0+550m. (4) Improvement of BC road from JK road Ratkhola Mondir to Dham Road Via H/o. Mr. Ali Sir under Nowapara Paurashava at Ch 0+000-1+250m, Ward No-01. (5) Construction of 2 (Two) nos RCC cross Drain (size-6.00x1.00x1.00) at Ch 0+050m & Ch 0+305m at Taltola Jamader Bari under Nowapara Paurashava. (6) Construction Of 2 (Two) Nos RCC Cross Drain (size-6.00x1.00x1.00) at Ch 0+050m & ch 0.00+540m at Koila Ghate School Road under Nowapara Paurashava 1.4600 158.554 M/S Y A Khan 158.554 24/09/2020 25/05/2022 100 18/11/2024
7 UIIP-BC/PCO/W-194 (1) Improvement of BC road from Gazipur Moddo Para Mosque to Johor Ali Golder House at Ch 0+00-0+350m and Link Monjur Gazi House to South Para Jame Mosque under Nowapara Paurashava at Ch 0+000-0+250m (Total Length=600m). (2) Improvement of BC Road from Gazipur Tarun Songo to Pouro Last area Lutfor Sheikh House at Ch 0+000-0+370m. under Nowapara Paurashava Total Length=370m (Ward No-8). (3) Improvement of BC Road from Gazipur Buri Battala Jame Mosque to Sarder Para Jame Mosque at Ch 0+000-0+750m, and Link Mojher Ali House to Gofur Sheik House at Ch 0+000-0+160m Total (Length=910.00m) under Nowapara Paurashava, Ward No-8. (4) Construction Of 2 (Two) Nos RCC cross Drain (size-6.00x1.00x1.00) at Ch 0+50m & 0+305m, under Nowapara Paurashava. 1.8800 148.931 M/s Y. A. Khan 148.931 25/05/2022 100 18/11/2024
8 UIIP-BC/PCO/W-26 (1) Improvement of BC Road from Rajghat JK road to JJI 2no Gate Under Nawapara Paurashava at ch 0+000-0+450m (2) Improvement of BC road from H/o Mr.Sumsul Haque to Pouro Last Area under Nowapara Paurashava at Ch 0+000-0+650m (3) Improvement of BC road from Mollamtola Molla Para Eid Goa to Ahad Ali Biswas House under Nowapara Paurashava at Ch 0+000-0+350m (4) Construction Of 2 (Two) Nos RCC Box Drain (size-6.000x1.00x1.00) at Ch 0+05m & 0+240m, Parashava: Nowapara , District: Jashore (5) Construction Of 01 (One) Nos RCC Box Drain (size-6.000x1.000x1.000) at Ch 0+350m), Parashava: Nowapara , District: Jashore 1.4500 106.117 SI & SC JV 106.117 15/06/2020 17/10/2021 100 18/11/2024
9 UIIP-BC/PCO/W-25 (1) Improvement of BC road from Shashan Ghat to Dhopadi Chashi Club more Under Nowapara Paurashava at Ch 0+000-2+000 = 2000.00m (Ward No-04). (2) Improvement of BC road from Dhopadi Chashi Club to H/o. Mr. Mojid Biswas Via Dhopadi Natun Bazer under Nowapara Paurashava at Ch 0+000-1+550 =1550m (Ward No-03), Parashava: Nowapara , District: Jashore 3.5500 151.699 SI & SC JV 151.699 15/06/2020 08/06/2021 70 18/11/2024
Total : 14.4480 (Km) 1467.15 (Lac) 1467.15 (Lac)