1
|
UIIP-BC/PCO/W-612
|
Construction of Public Transport Passenger Shed (28.00sqm) at Bhanga Gate Bazar in Word No-01 Under Nowapara Pourashava.
Construction of Public Transport Passenger Shed (28.00sqm) at Rajghat Bus Stand in Word No-08 Under Nowapara Pourashava.
|
|
27.990
|
|
27.990
|
|
|
0
|
18/11/2024
|
|
2
|
UIIP/PCO/G-63
|
Implelemtation of 500.00 nos Waste Basket 920 ltr) & 26 nos Non-motorized vehicle (van) under Noapara Pourashava District: Jashore.
|
|
39.790
|
RFL Plastics Limited
|
39.790
|
20/02/2024
|
20/05/2024
|
90
|
18/11/2024
|
|
3
|
UIIP-BC/PCO/W-609
|
1. Improvement of BC Road from Dhopadi Ulu Bottala to Dhopadi Charatala Road Via Nurani Madrasha at Ch. 0+00-1+886= 1886.00m at Ward No:03 Under Nowapara Pourashava.
2. Improvement of BC Road from Nowapara College Road to Buikara Govt. Primary School at Ch.0+00-0+946.00m at Ward No- 06 & 07 Under Nowapara Pourashava.
"3. Improvement of Buinkara Purabari BC Road Ch.0+00-0+646.00m and Link 01: Buinkara Sahadat House to Imran House side Road (Purabari) at Ch. 0.00-196.00m at Ward No:05 Under Nowapara Pourashava and Palisading work at (a) Samsul Haque Road at Ch. 0+400-0+430 (L/S) & Ch.0+400-0+420 (R/S) (b) Ekterpur Jamader Bari Road at Ch.00-25.00 (R/S) (C) Gazipur Buri Hattola Ch.390.00-415.00(R/S)
(Total Salvaged Amount=20,46,075.00 for Package)"
|
3.4780
|
296.055
|
Nishit Bosu
|
296.055
|
28/08/2023
|
27/08/2024
|
99
|
18/11/2024
|
|
4
|
UIIP-BC /PCO/W-373
|
(1) Improvement of road by BC from Jashore-Khulna Road to Nowapara Cement Mill Via Uttara Group Under Nowapara Pourashava,ch0+00-0+350.00=350.00m out of Ch 900.00m
(2)Construction of 2 (Two) Nos RCC road Cross Box Culvert ch 05m & ch 270m Near Uttora Group of Nowapara HimaloyCement millroad size 12.00x1.00x1.600.
(3)Improvement of BC Road from Nowapara Mini Bazar to Rupsha Poltry Road Ch0+00-0+440m.Out of Ch580.00m.Ward no-04
(4) Construction of 1 One Nos RCC Cross Drain Size -6.00x1.00x1.00 At Ch 02m.At BC Road from Nowapara Mini Bazar to Rupsha Poltry Road.
(5)Improvemnt of Road by BC from Pond of Mrs. Kala Buri to Maha Sashan Road at Kabiraj Paara Under Nowapara Pourashava,ch0+00-0+580.00m Ward No-02.
(6)Construction of 2 (Two) Nos RCC road Cross Drain from Pond of Mrs. Kala Buri to Maha Sashan Road at Kabiraj Para Size -6.00x1.00x1.00 at Ch 02m & Ch 577m Under Nowapara Pourashava Ward No-02.
(7)Construction of 1 (one) Nos RCC road cross Box Culvert at By pass Road Near Shop of Mr.Raihan CRDP/W-1 Under Nowapara Pourashava Size-10.00x1.000x2.000.
(8) Construction of RCC Drain cum Footpath of Mohila College and Girls School area at Guakhula at Ch 01) 0+00-0+210m, 02)0+00-0+071m, 03)0+00-0+035m 05)0+00-0+045m under Nowapara Pourashava.
|
1.3700
|
246.612
|
M/S. SAIFUL HASAN JOARDAR
|
246.612
|
04/08/2022
|
03/08/2023
|
96
|
18/11/2024
|
|
5
|
UIIP-BC /PCO/W-372
|
(1) Improvement of Hospital Road by lane by RCC from Nowapara Puls Clinic to H/o. Mr. Harun/ Sahana Bilash C h 0+000-0+340m.out of 450m.Ward No-05.
(2 )Construction of RCC drain by the side of Hospital road from Nowapara Puls Clinic to H/o. Sahana Bilash Ch 0+000-0+340m.out of 450m.Ward No-05.
(3)Construction of 4 (Four) Nos RCC road Cross Drain Type-E size- 3.00mx0.400x0.600 at Ch 0+05m, 0+195m,0+300m & 0+335m of Hospital road from Nowapara Puls Clinic to H/o. Sahana Bilash Ward No-05.
(4)Construction of 2 (Two) Nos 12m RCC road Cross Box Culvert at Entry of Nowapara Rail Station In and Out Size-1.600x1.600.
(5) Construction of RCC Drain cum Footpath at Clinic Para from H/o. Mr.Modesser to Hospital road via H/o.Mst.Morzina and H/o Mr. Monju Ch 01) 0+00-0+131m, 2)0+00-0+031m 03) 0+00-0+020m.
(6)Construction of RCC Drain from S/o. MARCEL Show Room to H/o.Mr.Dulu at Ch 0+00-0+170m.
(7) Improvement of RCC road From S/o.MARCEL Showroom to H/o. Mr.Dulu at Ch 0+00-0+110m.
(8) Improvement of Peer Bari Majar to Jashore-Khulna road Via Abhaynagar Upozilla Office at Ch 0+00-0+660m Ward No-06.
(9) Construction of RCC Drain by the side of Peer Bari Majar to Jashore-Khulna road Via Abhaynagar Upozilla Office at Ch 0+00-0+660m Ward no-06
(10) Improvement of RCC road from Jashore-Khulna road to H/o.Mr.Mustain via Mr. Kosi Huzur at Ch 0+00-0+150m.
(11) Construction of RCC Drain from Jashore-Khulna road to Southern School via H/o Mr. Mustain and Mr.Kosi Huzur at Ch 0+00-0+200m
(12) Construction of RCC Drain from H/o.Mr. Musa to Bypass road Via H/o.Mr. Goutom at Ch 0+00-0+160m
(13 )Construction of 1 One RCC Box Culvert at Bypass road Near H/o.Mr. Goutom Size 10.00x1.00x1.600 under Nowapara Pourashava.
|
1.2600
|
291.400
|
M/S. SAIFUL HASAN JOARDAR
|
291.400
|
04/08/2022
|
03/08/2023
|
84
|
18/11/2024
|
|
6
|
UIIP-BC/B25:B31PCO/W-195
|
(1) Improvement of BC road from Taltola Jamader Bari LGED Road to H/o. Siddique at Ekterpur under Nowapara Paurashava at Ch 0+000-0+310m.
(2) Improvement of By pass road from Model School to H/o. Mr. Aslam under Nowapara Paurashava at ch 0+000-0+475m ward No-06.
(3) Improvement of BC Road road from Koila Ghate School to Ropsha Poltri road under Nowapara Paurashava at Ch 0+000-0+550m.
(4) Improvement of BC road from JK road Ratkhola Mondir to Dham Road Via H/o. Mr. Ali Sir under Nowapara Paurashava at Ch 0+000-1+250m, Ward No-01.
(5) Construction of 2 (Two) nos RCC cross Drain (size-6.00x1.00x1.00) at Ch 0+050m & Ch 0+305m at Taltola Jamader Bari under Nowapara Paurashava.
(6) Construction Of 2 (Two) Nos RCC Cross Drain (size-6.00x1.00x1.00) at Ch 0+050m & ch 0.00+540m at Koila Ghate School Road under Nowapara Paurashava
|
1.4600
|
158.554
|
M/S Y A Khan
|
158.554
|
24/09/2020
|
25/05/2022
|
100
|
18/11/2024
|
|
7
|
UIIP-BC/PCO/W-194
|
(1) Improvement of BC road from Gazipur Moddo Para Mosque to Johor Ali Golder House at Ch 0+00-0+350m and Link Monjur Gazi House to South Para Jame Mosque under Nowapara Paurashava at Ch 0+000-0+250m (Total Length=600m).
(2) Improvement of BC Road from Gazipur Tarun Songo to Pouro Last area Lutfor Sheikh House at Ch 0+000-0+370m. under Nowapara Paurashava Total Length=370m (Ward No-8).
(3) Improvement of BC Road from Gazipur Buri Battala Jame Mosque to Sarder Para Jame Mosque at Ch 0+000-0+750m, and Link Mojher Ali House to Gofur Sheik House at Ch 0+000-0+160m Total (Length=910.00m) under Nowapara Paurashava, Ward No-8.
(4) Construction Of 2 (Two) Nos RCC cross Drain (size-6.00x1.00x1.00) at Ch 0+50m & 0+305m, under Nowapara Paurashava.
|
1.8800
|
148.931
|
M/s Y. A. Khan
|
148.931
|
|
25/05/2022
|
100
|
18/11/2024
|
|
8
|
UIIP-BC/PCO/W-26
|
(1) Improvement of BC Road from Rajghat JK road to JJI 2no Gate Under Nawapara Paurashava at ch 0+000-0+450m
(2) Improvement of BC road from H/o Mr.Sumsul Haque to Pouro Last Area under Nowapara Paurashava at Ch 0+000-0+650m
(3) Improvement of BC road from Mollamtola Molla Para Eid Goa to Ahad Ali Biswas House under Nowapara Paurashava at Ch 0+000-0+350m
(4) Construction Of 2 (Two) Nos RCC Box Drain (size-6.000x1.00x1.00) at Ch 0+05m & 0+240m, Parashava: Nowapara , District: Jashore
(5) Construction Of 01 (One) Nos RCC Box Drain (size-6.000x1.000x1.000) at Ch 0+350m), Parashava: Nowapara , District: Jashore
|
1.4500
|
106.117
|
SI & SC JV
|
106.117
|
15/06/2020
|
17/10/2021
|
100
|
18/11/2024
|
|
9
|
UIIP-BC/PCO/W-25
|
(1) Improvement of BC road from Shashan Ghat to Dhopadi Chashi Club more Under Nowapara Paurashava at Ch 0+000-2+000 = 2000.00m (Ward No-04). (2) Improvement of BC road from Dhopadi Chashi Club to H/o. Mr. Mojid Biswas Via Dhopadi Natun Bazer under Nowapara Paurashava at Ch 0+000-1+550 =1550m (Ward No-03), Parashava: Nowapara , District: Jashore
|
3.5500
|
151.699
|
SI & SC JV
|
151.699
|
15/06/2020
|
08/06/2021
|
70
|
18/11/2024
|
|