SL No. Package No. Name Length (Km) Allotment (Lac) Name of Contractor Contract Amount (Lac) Date of Commencement Date of Completion Physical Progress (%) Date of Progress Update Remarks
1 Bhangura
1 UIIP-BC/PCO/W-449 A) Construction of Road from Shahjahan's Pond to H/O Hasem Ch.0.00-400m by RCC work at Chowbaria Dokkhinpara Ward No-09 Under Bhangura Pourashava District: Pabna B) Construction of Road from Mr. Mokaddes's Pond to H/O Mr. Afzal Ch.0.00-160m by RCC work at Kashipur Pourashava Ward No-06 Under Bhangura Pourashava District: Pabna C) Rehabilitation of Road from Uttam's Shop to H/O Mojibor Chairman (Ch.0.00-280.00m) by Dense Carpeting (DC) at Saratnagar Bazar Ward No-08 Under Bhangura Pourashava District: Pabna 0.8400 104.686 IBNUL-SAMIHA (JV) 104.686 11/03/2022 11/03/2023 70 27/09/2022 -
2 UIIP-BC/PCO/W-448 A) Rehabilitation of Road from H/O Monirul to Graveyard Ch.0.00-500m by Bituminus Dense Carpeting DC at Uttar Menda Ward No-01 under Bhangura Pourashava District: Pabna. B) Construction of Road from H/O Peal to H/O Hasinur Master by RCC Road (Ch.0.00-80m) at Kalibari Ward No-02 Under Bhangura Pourashava District: Pabna C) Rehabilitation of Road from DC Road Bylane to DC Main road Adjacent Sarutia School & H/O Pakhi Ch.0.00-1246m by Bituminus Dense Carpeting DC at Chowbaria Moddhopara Ward No-04 Under Bhangura Pourashava 1.8260 105.098 M/S Goodman Enterprise 105.098 11/03/2022 11/03/2023 75 27/09/2022 17.83% Less
3 UIIP-BC/PCO/W-447 A) Rehabilitation of Road from Akram Shop to Mouchak Cenama Hall Foot Bridge (Ch:0.00-420.00m) By Bituminous Dense Carpeting (DC) at Bhangura Bazer Ward No.-03 under Bhangura Pourashava District: Pabna.B) Rehabilitation of Road from Batajuri Mor to H/O Khorshed (Ch:0.00m-950.00m By Bituminous Dense Carpeting (DC) at Chowbaria Uttar Para Ward No.-07 under Bhangura Pourashava District: Pabna. 1.1530 128.160 M/S Goodman Enterprise 128.160 11/03/2022 11/03/2023 100 27/09/2022 18.90% Less
4 UIIP-BC/PCO/W-319 A) Rehabilitation of Road from H/O Mr. Kolimuddin Sir to GSM Road Ch.0.00-150m by RCC work at BhanguraMosjidpara ward-03 under BhanguraPourashava B) Construction of RCC Drain from (i) H/O KurbanSarder to H/O NimuCh.0-240m (ii) H/O Nimu to H/O SaifulCh.0-180m at Mosjidpara Ward-3 under BhanguraPourashava. C) Rehabilitation of Road from Shahinur Shop to H/O ShahalomShikderCh.0-1030m by Bituminus Dense Carpeting DC at Uttar Sarutia Ward No.-04 under BhanguraPourashava. 1.1800 126.423 IBNUL-SAMIHA (JV) 126.423 11/10/2021 11/10/2021 80 27/09/2022 18.40% Less
5 UIIP-BC/PCO/W-318 A) Construction of Road from Abdulpur Bazar Mor to Graveyard Culvert by RCC work Ch. 0.00-325m by RCC work at Uttar Menda ward no-01 under BhanguraPourashava. B) Improvement of Road from Uttar Menda Main Road bylane to toward SantinagrCh.0-400m by RCC work at Uttar Menda ward no-01 under BhanguraPourashava Pabna. C) Rehabilitation of Road from Baily Bridge to Hospital gate via Bus Stand by WBM Dense Carpeting Ch.0.00-400m at Ward No-05 under BhanguraPourashava. District: Pabna. 1.1250 114.990 SAMIHA-BISHWAS (JV) 114.990 11/10/2021 11/10/2022 70 27/09/2022 17.70% Less
6 UIIP-BC/PCO/W-317 A) Construction of RCC Drain from H/O Mr. Mozibor Chairman to Haran MajiGhatCh.0.00-330m at Saratnagar Bazar ward no-08 UnderBhanguraPourashava. District: Pabna. B) Rehabilitation of Road from H/O Mr. Mozibor Chairman to K.G School (Ch.0-95m) by Dense Carpeting (DC) at Saratnagar Bazar Ward no-8 under BhanguraPourashava. District :Pabna. C) Contruction of RCC Drain from Bissokorma Shop to H/O Aslam (Ch.0.00-110m) at ChowbariaModdopara ward-08 Under BhanguraPourashava. District :Pabna. D) Rehabilitation of Road from Bissokorma Shop to H/O Aslam (Ch.0.00-110m) by RCC at ChowbariaModdopara ward-08 Under BhanguraPourashava.District : Pabna. 0.2060 113.194 SAMIHA-BISHWAS (JV) 113.194 11/10/2021 11/10/2022 60 27/09/2022 15.508% Less
7 UIIP-BC/PCO/W-316 A) Rehabilitation of Road from College Mor to H/O KhorshedCh.0.00-720m by Bituminus Dense Carpeting DC at ChowbariaModdhopara Ward No.-07 under BhanguraPourashava. B) Contruction of RCC Drain from BhanguraSorotnogor Bazar Collage More to H/O Mr. Mahatab Master via H/O Mr.FoyajMolla to Sun-Bart School (Ch.0-405m) Under BhanguraPourashava District : Pabna. C) Improvement of Road from H/O Mr. Bissonatdeb to H/O Mr. Sohidul Ch. 0.00-210m by RCC work at Bhadropara ward no-08 under BhanguraPourashava. 0.9300 116.543 IBNUL-SAMIHA (JV) 116.543 11/10/2021 11/10/2022 95 27/09/2022 15.50% Less
8 UIIP-BC/PCO/W-92 (a) Improvement of Road from Maita-pool GSM Road to H/O Mr. Roj Ch.0-590m by WBM & Dense Carpeting at Dokkhin Sarutia Ward no-06 Under Bhangura Pourashava. District: Pabna (b) Improvement of Road from H/O Mr. Tojim Sir to H/O Mr. Monjur Mollah Ch.0m-515m by R.C.C Work at Chowbaria Dokkhinpara, Ward-09 under Bhangura Pourashava. 0.5900 107.159 Zinnat Ali Zinnah Ltd. 107.159 11/08/2021 100 27/09/2022 17.26% Less
9 UIIP-BC/PCO/W-91 (a) Rehabilitation of Road from Bhangur Sorote Nogur Bazar Cow Hat to H/O Aslam by R.C.C Work,WBM, Dense Carpeting (Ch.00-910m) at ward no-8 under Bhangura Pourashava. District :Pabna. (b) Rehabilitation of Road from Kalibari Bazar Main Road to H/O Abdur Rahman Sornokar Ch.0-420m by Dense Carpeting (DC) at Ward No-02 Under Bhangura Pourashava. District: Pabna. 1.3300 102.324 Zinnat Ali Zinnah Ltd. 102.324 11/08/2021 100 27/09/2022 20.25% Less
2 Chatmohar
1 UIIP/BC/PCO/W-325 A) Improvement of Bituminous Carpeting Road from 03 No. Ward Zero Point to Khaghat Mosque Road (Ch:0.00-870.00m) Under Chatmohar Pourashava Pabna.B) Construction of RCC Road from 04 No. Ward Kazi Para Shahi Mosque to kajipara Pond (Ch: 0.00-172.00m) Under Chatmohar Pourashava Pabna. 1.0420 67.746 Zinnat Ali Zinnah Ltd. 67.746 04/07/2022 20 27/09/2022 -
2 UIIP/BC/PCO/W-324 A) Construction of RCC Drain from 02 No. Ward at Vadunagor Bondhon Clenick to Haran more to Janata Bank to Boral River (Ch: 0.00-458.00m ) Under Chatmohar Pourashava Pabna. (Part-1)B) Construction of RCC Drain from Baluchor Mr. Chaonsol Comisonar House to Boral River(Ch: 0.00-105.00m ) Under Chatmohar Pourashava Pabna. 119.922 STJVMC 119.922 12/08/2021 04/07/2022 20 27/09/2022 16.70% Less
3 UIIP/BC/PCO/W-323 A) Construction of RCC Road from 08 No. Ward Baluchar Ansar House to 02 No. Ward Choto Shalikha Hanufa Eye Hospital to Haran more Akhlass Councilor House (Ch: 0.00-850.00m) Under Chatmohar Pourashava Pabna. B) Construction of RCC Road from 05 No. Ward Chowdhury para Medicine Corner Shop to Abdus Samad House (Ch: 0.00-385.00m) Under Chatmohar Pourashava Pabna. C) Construction of RCC Road from 03 No. Ward Baluchor Mr. Chonchol Comisonar House to Boral River (Ch: 0.00-105.00m ) Under Chatmohar Pourashava Pabna. D) Construction of RCC Road from 03 No. Ward Baluchar Mr. Mayon Shake House to Mr. Gopal Master (Ch: 0.00-212.00m ) Under Chatmohar Pourashava Pabna. 1.5520 174.068 STJVMC 174.068 04/08/2021 04/07/2022 98 27/09/2022 16.13% Less 1st and 2nd RA Done
4 UIIP/BC/PCO/W-88 Construction of RCC Drain at Vadunagor Bondhon Clenick to Haran more to Janata Bank to Boral River ch458.00 to 916.00 m under Chatmohar Pourashava Pabna. 0.9160 116.739 Zinnat Ali Zinnah Ltd 116.739 18/10/2021 85 27/09/2022 Heavy Raifall is hampering work progress
5 UIIP/BC/PCO/W-20 A) Rehabilitation of BC Road From word no 04 Narsary More to Vadu Nagor Road (ch00m – ch:0.00-535.00m) under Chatmohar Pourashavapabna. B)Rehabilitation of BC Road at word no 04 in site of Chatmohar Upozila porishod office Boundary under Chatmohar Pourashava Pabna. (i) UNO office To TEO office (ch 0.00m-257.00m).(ii) Officer's Cloub To UNO Residence (ch: 0.00- 171.00m). (iii) Upazila Jame Mosjid To BRBB Office (ch: 0.00-105.00m). (iv)Shillpokola Acadamy To Shapla coloni (ch 00m - 101m). C) Construction of RCC Road From 08 no ward Affrat Para Dhoshorote House to Aakul/Rontu house (ch: 0.00 – 148.00m) under Chatmohar Pourashava Pabna. D)Rehabilitation of BC Road From Ward no 08 Affrat Para G. A Joyen Uddin School to Sentry Security office (ch:0.00m – 185.00m) Under Chatmohar Pourashava Pabna . ii ) Rehabilitation of BC Road From Shapla Cloub to Balal house (ch:0.00 -215.00m) Under Chatmohar PourashavaPabna . E)Rehabilitation of BC Road From word no 04 Kaji para Pukur to X-Councilor Mukul house to Word no Affrat para Kaida master house (ch:0.00 -762.00m) Under Chatmohar Pourashava Pabna. ii) Rehabilitation of BC Road Link road Jabbar house to Lalon master house (Ch:0.00 – ch:142.00m) Under Chatmohar Pourashava pabna. F)Rehabilitation of BC Road From word no 04 Kaji Para Wahab house to Dr. Anish house at Narsary Road (ch:0.00m – Ch:301.00m) Under Chatmohar Pourashava Pabna. ii ) Rehabilitation of BC Road From 04 no word Kaji Para Aanis house to Sanu house (ch:0.00- 168.00m) under Chatmohar Pourashava Pabna. 3.0900 127.958 M/S Samiha Enterprise 127.958 18/10/2021 100 27/09/2022 4.67% Less
3 Faridpur
1 UIIP-BC/ PCO/W-516 A) Construction of RCC road including RCC slope protection works from Banwarinagar- Khagorbaria road to Ruldah moar- Notun Para road under Faridpur Pourashava (Ch.0.00-207m). B) Construction of RCC road from WAPDA Bundh- Ruldah road to house of Actor Masum Aziz at Khalishadah under Faridpur Pourashava (Ch.0.00-72 m). C) Construction of HBB road including earth filling work beside the house of Alamin at Khalishadah under Faridpur Pourashava (Ch.0.00-52m) D) Widening of RCC road including RCC slope protection works from Faridpur Upazila Complex Gate to Upazila Parished Dormitory Gate at Banwarinagar under Faridpur Pourashava (Ch.0.00-400 m). E) Construction of RCC drain with top slab from the House of Rahim to the canal at Khalishadah under Faridpur Pourashova Pabna (Ch.0.00-167 m). F) Construction of single Vent RCC Box Culvert (4.0 mX2.6m) on the canal beside the House of Hafiz at Khalishadah under Faridpur Pourashava Pabna. Leanth 4.50. G) Construction of RCC drain with top slap from the House of Masum to the main drain beside Thanapara Bus-Stand at Thanapara south under Faridpur Pourashava Pabna (Ch.0.00- 108 m) H) Construction of RCC drain with top slab from House of Ratan Das to the drain beside the house of Shamsul at Thanapara south under Faridpur Pourashava Pabna (Ch.0.00-52 m) 0.7310 164.574 Md. Zahidur Rahman, Pabna Sadar, Pabna. 164.574 19/04/2022 18/04/2023 0 27/09/2022 1.75% Less
2 UIIP-BC/ PCO/W-515 (A) Construction of RCC road including RCC slope protection works from Banwarinagar Central Zam-E-Mosque to toilet of Banwarinagar CBP High School under Faridpur Pourashava Pabna (Ch:0.00-178.00m). (B) Construction of RCC road from main road to house of Abbas at Par-Faridpur under Faridpur Pourashava Pabna (Ch.0.00-158m). (C) Construction of RCC road from main road to house of Younus at Kashipur under Faridpur Pourashava Pabna (Ch.0.00-128m). (D) Construction of RCC road from main road to the land of Rashidul at Kashipur under Faridpur Pourashava Pabna (Ch.0.00-100m). (E) Widening of RCC road including RCC slope protection works from Banwarinagar Tetul Tala moar to Banwarinagar CBP High School Gate under Faridpur Pourashava Pabna (Ch.0.00-72m). 0.6360 148.698 Md. Rafiqul Islam, Sujanagar, Pabna. 148.698 27/04/2022 26/04/2022 0 27/09/2022 20.81% Less
3 UIIP-BC/ PCO/W-380 Construction of RCC drain from Nishipara culvert to Baral River under Faridpur Pourashava (ch.0.00-300 m). 209.030 M/S Hossain Enterprise 209.030 11/07/2021 10/07/2022 73 27/09/2022 13.40% Less
4 UIIP-BC/ PCO/W-379 (a) Construction of HBB road including earth filling from Shamsul Huda market to Proposed Mosque at Banwarinagar under Faridpur Pourashava (ch.0-235 m) (b) Construction of HBB road including earth filling from h/o Shamsul Professor to h/o Bakar master at Banwarinagar under Faridpur Pourashava (ch.0-162m) © Construction of RCC road including earth filling from h/o Kamal Pasha to h/o Shahadat at Khalishadah under Faridpur Pourashava (ch.0-107 m ) (d) Improvement and widening of BC road by Bituminous Dense Carpeting (DC) from Khalishadah WAPDA bundh to h/o Rezaul under Faridpur Pourashava (ch.0-293m) (e) Construction of HBB road including earth filling from Khalishadah Carpeting road to the land of Torit under Faridpur Pourashava (ch.0-90 m ) f) Construction of BC road from house of Freedom Fighter Dulal to house of Lablu at Thanapara north under Faridpur Pourashava (ch.0-479 m) (g) Construction of RCC road from Faridpur Technical & B.M College to h/o Alomgir at Banwarinagar under Faridpur Pourashava (ch.0-65 m ). 1.4310 100.506 M/S Five Brothers Construction 100.506 26/09/2021 25/09/2021 60 27/09/2022 0.11% Less
5 UIIP-BC/ PCO/W-378 (a) Construction of BC road from Wapda Bundh to house of Ali at Ruldah under Faridpur Pourashava ( ch.0- 410 m)(b)Construction of BC road from Wapda Bundh to Mridhapara road at Rauthnagdhapara under Faridpur Pourashava ( ch.0-733 m). 1.1430 79.335 M/S Progoti Enterprise 79.335 11/07/2021 10/07/2022 34 27/09/2022 23.36% Less
6 UIIP-BC/ PCO/W-315 Improvement of BC road by Bituminous Dense Carpeting (DC) from Sharif moar to Kashipur Govt. Primary School under Faridpur Pourashava (ch.0 - 2290 m ). 2.2900 91.619 M/S Faridpur Enterprise-Sri Sushanto Kumar(JV) 91.619 05/02/2021 25/06/2021 100 27/09/2022 23.11% Less
7 UIIP-BC/ PCO/W-314 (a) Construction of RCC road from Uttar Tearpara main road at h/o Karim to WAPDA Bundh under Faridpur Pourashava (ch.0 - 359 m ).(b) Improvement of BC road by Bituminous Dense Carpeting (DC) from Banwarinagar CBP High School to Gopalnagar Bazar moar under Faridpur Pourashava (ch.0-1170 m). 1.5290 103.256 FIVE BROTHERS-EHSANUL AZAM-JV 103.256 05/02/2021 09/06/2021 100 27/09/2022 21.76% Less
8 UIIP-BC/ PCO/W-313 Construction of RCC road including RCC protective works from Faridpur Upazila Complex Gate to Upazila Server Station at Banwarinagar under Faridpur Pourashava (Road= ch.0 - 250 m, RCC Protective Works= ch.153 - 423 m ). 0.2500 108.364 M/S OMIO TRADERS 108.364 08/02/2021 07/02/2022 92 27/09/2022 23.37% Less
9 UIIP-BC/ PCO/W-312 (a) Construction of RCC road from Par-Faridpur Sharif moar to house of Shamser at Par-Faridpur under Faridpur Pourashava ( ch.0- 72 m). (b) Construction of HBB road including earth filling from Par-Faridpur main road to Par-Faridpur Govt. Primary School under Faridpur Pourashava ( ch.0- 95 m). (c) Construction of RCC road from house of Rezaul to bathing ghat at Par-Faridpur under Faridpur Pourashava ( ch. 0- 43 m). (d) Construction of RCC road from Par-Faridpur main road at house of Helal to house of Abul at Par-Faridpur under Faridpur Pourashava ( ch.0-153 m). (e) Construction of RCC drain with slab from Par-Faridpur main road at house of Helal to house of Abul at Par-Faridpur under Faridpur Pourashava ( ch.0- 113 m). (f) Construction of RCC road from main road to Faridpur Poura Women's College at Par-Faridpur under Faridpur Pourashava (ch.0- 49 m ). (g) Construction of HBB road including earth filling from house of Aynal mistry to Wapda Bundh at Rauthnagdhapara under Faridpur Pourashava ( ch.0- 215 m). (h) Construction of HBB road including earth filling work from house of Dev Narayan to house of Ahammad Ali at South Tearpara under Faridpur Pourashava ( ch.0 - 52 m). (I) Construction of RCC road from the main road at Rauthnagdhapara Govt. Primary School to stair ghat at Rauthnagdhapara under Faridpur Pourashava (ch.0 - 313 m ). 0.9920 108.784 OMIO TRADERS-DIN AMIN (JV) 108.784 22/02/2022 100 27/09/2022 18.07% Less
10 UIIP-BC/ PCO/W-311 (a) Improvement of BC road by Bituminous Dense Carpeting from Banwarinagar- Khagorbaria road in front of Faridpur Upazila Parishad Gate to dwelling house of UNO, Faridpur, Pabna under Faridpur Pourashava (ch.0 - 207 m ) (b) Improvement of BC road by Bituminous Dense Carpeting from Faridpur Upazila Parishad main road in front of dwelling house of Upazila Parishad Chairman to Officers' Staff Quarter under Faridpur Pourashava (ch.0 - 37 m ). (c) Construction of RCC road from Upazila Digital Centre to Upazila Programme Office, Faridpur, Pabna under Faridpur Pourashava (ch.0 - 102 m ). (d) Construction of RCC road from Banomali Memorial Library to Upazila Sub-Register Office, Faridpur, Pabna under Faridpur Pourashava (ch.0 - 86 m ). (e) Construction of RCC road from Upazila Sub-Register Office road to AC (Land) Office, Faridpur, Pabna under Faridpur Pourashava (ch.0 - 51 m ). (f) Construction of RCC road from Faridpur Upazila Parishad main road in front of Upazila Ansar VDP Office to Banwarinagar Girl's High School under Faridpur Pourashava (ch.0 - 75 m ). (g) Construction of RCC road from Banwarinagar Girl's High School road to Faridpur Upazila DPHE Office under Faridpur Pourashava (ch.0 - 31 m ). (h) Construction of RCC road from Faridpur Upazila Parishad main road in front of dwelling house of UNO,Faridpur, Pabna to Officers' Club under Faridpur Pourashava (ch.0 - 67 m ). (I) Construction of RCC road in front of Faridpur Upazila Dormitory and Staff Quarter at Banwarinagar under Faridpur Pourashava ( ch.0-119 m). (j) Construction of RCC road from Banwarinagar-Khagorbaria road to Upazila Staff Quarter at Ban-wainagar under Faridpur Pourashava (ch.0-28 m). (k) Construction of RCC road from Upazila Server Station road to h/o Freedom Fighter Abul Hashem at Ban-warinagar under Faridpur Pourashava (ch.0-75 m ). 0.8030 90.227 M/S Faridpur Enterprise-Sri Sushanto Kumar(JV) 90.227 10/03/2021 09/03/2022 100 27/09/2022 8.00% Less
11 UIIP/BC/ PCO/W-90 (A) Construction of RCC road from Banwarinagar Alim Madrasa to Ruldah Wapda Bundh under Faridpur Pourashava ( ch.0- 312 m). (B) Construction of RCC road from house of Advocate Abul Hossain to house of Abdus Sattar at Banwarinagar under Faridpur Pourashava ( ch.0- 65 m). (C) Construction of HBB road including earth filling from house of Nuru to Wapda Bundh at Banwarinagar under Faridpur Pourashava ( ch.0- 72 m). (D) Construction of RCC drain with RCC slab including box drain (1.0 mX1.0 mX0.200 m) from Faridpur Technical & B.M College to C 0.4490 96.272 SONEX-KHALEQUE JV 96.272 09/08/2020 27/10/2021 100 27/09/2022 19.90% Less
12 UIIP/BC/ PCO/W-89 (A)Improvement and Widening of road from Thanapara culvert to Food godown moar by Bituminous Dense Carpeting (DC) under Faridpur Pourashava ( ch.0-518 m ). (B) Construction of RCC road from Thanapara culvert to house of Krishna Councillor at Thanapara north under Faridpur Pourashava ( ch.0-93 m). (C) Construction of RCC road from Krishna councilor’s shop to Nishipara Govt. Primary School at Nishipara under Faridpur Pourashava ( ch.0-76 m). (D) Construction of RCC road from Thanapara main road at house of Kalimuddin to Nishipara Kalimondir under Faridpur Pourashava ( ch.0-116 m). (E) Construction of RCC Box drain beside Nishipara Kali-mondir under Faridpur Pourashava (2.5 mX3.0 mX0.225 m). Leanth 12m. (F) Construction of HBB road from house of Nurul Islam to house of Hafiz at Khalishadah under Faridpur Pourashava( ch.0-77 m). 0.8800 110.080 SONEX-KHALEQUE JV 110.080 09/08/2020 27/10/2021 100 27/09/2022 19.84% less
Total : 26.9140 (Km) 3035.76 (Lac) 3035.76 (Lac)