Loading...

Project Scheme Detail List
SL No. Package No. Name Length (Km) Allotment (Lac) Name of Contractor Contract Amount (Lac) Date of Commencement Date of Completion Physical Progress (%) Date of Progress Update Remarks
1 Bakerganj
1 UIIP/PCO/G-34 Implementation & Supply 765 nos Waste Basket (120 ltr) & 10 nos Non-motorized vehicle (van) under Bakerganj Pourashava District: Barishal. 39.970 RFL Plastrics Limited 39.970 10 07/10/2024
2 UIIP-BC/PCO/W-551 A)       Construction of RCC Road from Sadar road to Betagi Road (Ch: 0.00-62.00m) Under R&H Bridge at ward No.-02, Under Bakerganj Paurashava. B) Construction of RCC road from Aga baker road to Bongobondhu Road (Ch:0.00-156.00m) Under R&H bridge Bank of Srimonto River at ward No.-08, Under Bakerganj Paurashava. C) Construction of RCC road from Sahebganj road to Sabujbag road west side of twin quarter (Ch: 0.00 -157.00m & Link 7m+7m=14m, Total Length=171m) at ward no 05, Under Bakerganj Paurashava D) Construction of Rustum ali road by RCC from R&H road to T&T road, Ch:0.00-122.00m at ward No.- 04, Under Bakerganj Paurashava E) Construction of RCC road from aga baker khan link road to aga baker khan road west side of Pourashava road (Ch:0.00-119.00m) at ward no. 04, Under Bakerganj Paurashava Construction of RCC road from Talukder bari road to Mollik bari road (Brave Freedom Fighter Abdus Sobhan Mallik Road) (Maim Road Ch: 0.00-120.00m & Link-01=20m, Link-02=80m, Link-03=15m) at ward no 09, Under Bakerganj Paurashva G) Construction of aga baker khan Main Road by RCC (Ch:0.00-51.00=51m) from T&T Road to R&H road at ward No. 04, Under Bakerganj Paurashava. (Dropped) 0.8820 145.860 M/S Enterprise 145.860 03/07/2023 02/06/2024 100 07/10/2024
3 UIIP-BC/PCO/W-520 A) Construction of Shed for Public Transport Passenger (28.00sqm) Beside R&H Road Connecting point on Bus stand at ward No.01 Under Bakerganj Pourashava. B) Construction of One Storied Public Toilet (Type A=56.00sqm) Beside R&H Road & Jelkhana Khal at ward No.02 Under Bakerganj Pourashava. 47.110 M/S Enterprise 47.110 19/09/2022 11/09/2023 97 07/10/2024
4 UIIP-BC/PCO/W-293 A construction of Single Vent RCC 3.00 x 3.00 Box Culvert in khal from R H road to North Azimpur Kshashem Mazi Bari Road. Ward No-07. Under Bakerganj Pourashava B. construction of Single Vent RCC 2.00x2.00 Box Culvert In khal side of Runshi road to West side of Kalam Councilors house. Ward No-O1. Under Bakerganj Pourashava C. construction of Single Vent RCC 2.00x2.00Box Culvert in Varani Khal West side of Bari market. Ward No-OS. Under BakerganjPourashava D. construction of Single Vent RCC 2.00x2.00Box Culvert in Khal Padma Dighivarry road . Ward No-06. Under Bakerganj Pourashava. E. construction of Single Vent RCC 2.00x2.00 Box Culvert in Khal Runshiivarry road to Shampurgami road in front of Unus Hawladers house Ward No-01. Under Bakerganj Pourashava. F construction of Single Vent RCC 2.00x2.00 Box Culvert in Khal Ruhiter par road towards South in front of Akkas Gazi House Ward No-09. Under Bakerganj Pourashava. 76.696 M/S Jamal Sarder 76.696 01/08/2021 31/07/2022 100 27/09/2022 0.028% Less
5 UIIP-BC/PCO/W-292 A. Construction of RCC Drain from West side of Rony house to R and H ditch Ward 0 I. Under Bakerganj Pourashava. ChO.00-153.00m 153.00m. B. Construction of RCC Drain from Skin Mridha shop to Thana more Chourasta existing RCC Drain Ch 00-98.00m D I from West side of Skin Mridha shop to Tulatoli River. Ch 00-122.00m D2 from Skin Mridha house to proposed D2 drain Ch 00-92m92m D3.At ward No-03. Under Bakerganj Pourashava C. Construction of RCC Drain from Emdad Khandoker house to R and Khal. At Ward No-07. Under Bakerganj Pourashava.ChOO- 107m. D. Construction of RCC Drain from Md. Kalarn house to Sreemonto river East side of Madrasha Road and West side of Girls School at ward No-05. Under Bakerganj Pourashava. D I ChOO-285m. D2 ChOO-60m. 136.589 M/S Muhib Construction 136.589 01/08/2021 31/07/2022 100 27/09/2022 2.024% Above
6 UIIP-BC/PCO/W-291 A Construction of RCC Road from high School road to Primary School and JSU High School.Bakerganj Pourashava.Ward No-04. Under Bakerganj Pourashava B Construction of RCC Road fromR & H road to M. Rahman Sarok. North side of Muzahidia Madrasha Ward No- 02. Under Bakerganj Pourashava. ChOOm-266m266m. C Construction of RCC Road from Sadar road to Ripon Councilors house. Ward No-02. Under Bakerganj Pourashava. ChOOm-244m.D Construction of RCC Road from Sadar road to Tulatoli River & house of ton Chakraborti twowards West. Ward No- 02. Under Bakerganj Pourashava. ChOOm 153m .Link30m 1.0290 121.913 S/M Enterprise 121.913 01/08/2021 31/07/2022 100 27/09/2022 0.048% Less
7 UIIP-BC/PCO/W-161 A Construction of RCC Road from Bakerganj Betagi Road to Runshi varry Road West side of Kundo Bari towards North ChO.OO-480m480m Ward No-01. Under Bakerganj Pourashava B Construction of RCC Road from Bakerganj Betagi Road to Runshi varry Road infront of Kalarn Councilor house toward west ChO.OO-165m165m. Ward no 01. Under Bakerganj Pourashava C Construction of Graveyard Road by RCC Ch 199-326 m. At ward No 07.Under Bakerganj Pourashava. 0.7720 95.365 M/S Muhib Construction 95.365 08/11/2020 30/10/2021 100 27/09/2022 0.063% Less
8 UIIP-BC/PCO/W-160 Construction of RCC Road from Akon Bari Road to Talukder Bari Road. Ch0.00-590.00m590.00m and Link Akon 3ari Mosque Ch 0.00-90.00 m. Total Length 680m Ward no- 09.Under Bakerganj Pourashava. 0.6800 84.680 S/M Enterprise 84.680 08/11/2020 30/10/2021 100 27/09/2022 As Per
9 UIIP-BC/PCO/W-159 Construction of RCC Drain left side of B.I.P Road from Bakerganj Betagi road to Khalifa Bari Khal ChOO.OOm to 510m.Ward No-O1.Under Bakerganj Pourashava and Agabaker Road to High School Road ChOO.OOm to 60m.Ward no- 04Under Bakerganj Pourahava. 89.106 S/M Enterprise 89.106 08/11/2020 30/10/2021 100 27/09/2022 0.047% less
10 UIIP-BC/PCO/W-126 Construction of R.C.C road from Sree dhanto bariroad to Atharogasiagami road via Nagor Mollah house.Ward No-0809. Under Bakerganj Pourashava.Ch 00 m- 885 m 0.8850 99.928 M/S Muhib Construction 99.928 15/10/2021 100 27/09/2022 As Per
11 UIIP-BC/PCO/W-125 Estimate for RCC road of Post Office road to Varani Khal.LGED Approch and Hospital Ch00m-310m and Post Office road to LGED Bridge Approch towards North- East Ch00-240 m.Ward No-05. Under Bakerganj Pourashava. Estimate for Construction of R.C.C road from Bakerganj Betagi road to B.I.P road North Side of Miraz House.Ch 00m to 362 m. Ward No-01.Under Bakerganj Pourashava. 0.6020 109.228 M/S Muhib Construction 109.228 15/10/2021 100 27/09/2022 0.01% Less
12 UIIP-BC/PCO/W-124 Construction of B.C road from Ruhiterpar R & H to Padma Dighi via Fiha Bricks.Ward No-06. Under Bakerganj Pourashava.Ch 00m - 682m. construction of BC road from R & H road to Hasan Mekar house. Ward No-01. Under Bakerganj Pourashava. Ch00m to ch320 m. 1.0020 90.172 M/S T M Enterprise 90.172 15/10/2022 100 27/09/2022 As Per
13 UIIP-BC/PCO/W-123 Construction of R.C.C. road from Bakerganj Betagi road to Baroi Bari Bridge infront of B.I.P. Colony.Ward No-01.Under Bakerganj Pourashava.Ch00.00-885.00m. Estimate for Construction of B.C road from Shahebganj road to Shahebganj West Side of Tween Quarter. Ch157-257.00 m100.00 m. Ward no-05.Under Bakerganj Pourashava 0.9850 91.147 M/S Muhib Construction 91.147 15/10/2021 100 27/09/2022 0.01% Less
2 Gouranadi
1 UIIP/PCO/G-35 Implementation & Supply 602 nos Waste Basket (120 ltr) & 20 nos Non-motorized vehicle (van) under Gournadi Pourashava District: Barishal. 39.975 RFL Plastrics Limited 39.975 03/04/2024 02/07/2024 0 07/10/2024
2 UIIP-BC/PCO/W-553 A) Improvement of Road from Goat Market Road to Torki Bondor Mutual Trust Bank via Torki High School (Ch. 22.00 to 280.00m) by RCC with a Cross Drain at Ward no. 01, under Gournadi Pourashava, Barishal. B) Improvement of Road from Sawra Shahjahan Howlader House to Sawra Govt. Primary School (Ch 0.00m to 146m) by RCC and One Road cross Drain at Ch.3.00m, Ward No. 06, Gournadi Pourashava, District : Barishal. C) Improvement of BC Road from Hizoltala Paik Bari to Bokultala Road (Ch:174-318m) by Bituminous Dense Carpeting (DC) at Ward No:06 under Gournadi Pourashava, District: Barishal 0.5430 75.875 M/S Howleder enterprise 75.875 28/05/2023 27/05/2024 99 07/10/2024
3 UIIP-BC/PCO/W-518 A) Construction of One Storied Public Toilet (Type A=56.00sqm) at ward No.06 Under Gournadi Pourashava, Dist: Barishal B)Construction of Shed for Public Transport Passenger (28.00sqm) at ward No.06 Under Gournadi Pourashava, Dist: Barishal. 49.898 M/S Howleder enterprise 49.898 10/07/2022 29/02/2024 100 07/10/2024
4 UIIP-BC/PCO/W-494 A) Construction of Single Vent (2.00x2.00m) RCC Box Culvert at Ashokati-Gerakul Road infront of Paik Bari Ward No.08 Under Gournadi Pourashava Dist: Barishal. B) Construction of Single Vent (2.00x2.60m) RCC Box Culvert at Torkir Char Kashir Mistir Dokan Ward No.02 Under Gournadi Pourashava Dist: Barishal. C) Construction of Single Vent (4.30x4.30m) RCC Box Culvert Over Khal at Torki Vozon Kundu Oil Mil Ward No.02 Under Gournadi Pourashava Dist: Barishal. D) Construction of Single Vent (3.00x3.00m) RCC Box Culvert Over Cannel infront of Torki Omor Roy House Ward No.01 Under Gournadi Pourashava Dist: Barishal. E) Construction of Single Vent (1.30x1.30m) RCC Box Culvert Over Cannel infront of Diashur Chowkider House Road Ward No.08 Under Gournadi Pourashava Dist: Barishal. 84.998 M/S Howleder enterprise 84.998 09/06/2022 05/06/2023 100 07/10/2024
5 UIIP-BC/PCO/W-493 A (i) Construciton of RCC Drain from Gournadi-Sarikal GC road North Side of Khan Shoping to via Bhuiya Store to Birendash store to Gournadi river (Ch: 0.00-195m D1) (ii) Ice factory to Shathi Garments (Ch: 0.00-95m D2) (iii) Birendash Store to Sochin Gosh Sweet factory near cannel (Ch: 0.00-95 D3) (iv) Shathi Garments to front of Registry Office (Ch: 0.00-85m D4) (v) Bhuiya Store to Gournadi Cannel ( Ch: 0.00-35m D5) Ward No. 05 Under Gournadi Pourashava Dist: Barishal. B(i) Construciton of RCC Drain Torki Bandor Liton khan store to near by Sheraz Member shop cannel (Ch: 0.00-275m D1) (ii) Torki Bandor High School gate to Fish Market South Corner (Ch: 0.00-155m D2) (iii) Bagdad Hotel near by pond to south side of fish market Main drain (Ch: 0.00-100 D3) (iv) Torki Bandor Mosque to South side main drain (Ch: 0.00-60 D4) at ward No. 01 Under Gournadi Pourashava Dist: Barishal. C (i) Construciton of RCC Drain from Gournadi - Sorikal GC road North side Karim Professor House to Chargadhatali Baitul Noor Mosque (Ch: 0.00-230m D1) (ii) Banker Akbar House to Baitul Noor Masque Main Drain (Ch: 0.00-120m D2) (iii) Baizid Akon House to Ekram Professor House near main Drain (Ch: 4.00-36m D3) (iv) X-Drain Near By Ekram Professor House (Ch: 0.00-04m) Ward No. 05 Under Gournadi Pourashava Dist: Barishal. 231.901 M/S Howleder enterprise 231.901 09/06/2022 31/08/2024 98 07/10/2024 0.001% Less
6 UIIP-BC/PCO/W-492 A) Repairing of BC road from Diasur Joshim Shop to Banglabazer road (Ch: 0.00m to 766m) by Bituminus Dense Carpeting (DC) Under Gournadi Pourashava District: Barishal B) Repairing of BC road from Gerakul Govt. Primary School to Dulal Khan Shop (Ch: 0.00m to 1160.00m) by Bituminus Dense Carpeting (DC) and Three U-drain at Ch. 296m 533m 722m ward No.08 Under Gournadi Pourashava District: Barishal C) Construction of RCC road from Diasur kobiraj House to Alamin Howlader House(Ch: 0.00m to 190m) via Shohid Gazi House (Ch: 176.00m to 236m) Under Gournadi Pourashava District: Barishal D) Construction and Installing Palisading for road side development at Pourashava road Tikasar Mintu Howlader House adjacent Pond (201m) by Masonry Brick work and Pre-Cast RCC Post Palisading ward No.05 under Gournadi Pourashava District : Barishal. 2.2770 115.126 M/S Howleder enterprise 115.126 30/05/2022 22/05/2023 100 07/10/2024 0.015% Less
7 UIIP-BC/PCO/W-491 A) Improvement of road from Madbor Bari Jame-Mosque to Bangla Bazar road (Ch: 0.00m to 518m) by Bituminous Dense Carpeting (DC) with three U-Drain at Ch:100m 196m 350m of Gournadi Pourashava District : Barishal. B) Rehabilitation of BC road South Bijoypur Mamun Furniture to R&H road (Ch: 0.00m to 566m) by Bituminous Dense Carpeting (DC) Gournadi Pourashava District : Barishal. C) Construction of RCC road from Food Godown to Fish Market Bridge (Ch: 0.00m to 135m) Under Gournadi Pourashava District: Barishal D) Repairing of BC road from Gournadi Thanar More to ASP Office Via Rob CEO House (Ch: 0.00m to 330m) by Bituminus Dense Carpeting (DC) Under Gournadi Pourashava District: Barishal 1.5490 91.590 M/S Howleder enterprise 91.590 30/05/2022 22/05/2023 100 07/10/2024 0.01% Less
8 UIIP-BC/PCO/W-233 (a) Improvement of road from Tikashar Khan Bari Mosque to Upazila Dormetory (Ch 0.00m to 391m) by Bituminous Dense Carpeting (DC), Gournadi Pourashava, District : Barishal. (b) Repairing of BC road from Gournadi Upazila Gate to Gournadi Bazar via Azad Professor House (Ch 0.00m to 673m) by Bituminous Dense Carpeting (DC), Gournadi Pourashava, District : Barishal. (c) Rehabilitation of BC road from Upazilla Public Health Office to Dewan Bari (Ch 0.00m to 240m) by Bituminous Dense Carpeting (DC), Gournadi Pourashava, District : Barishal. (e) Rehabilitation of BC road from Hizoltala Paik Bari road to Bokultala road (Ch 0.00m to 318m) by Bituminous Dense Carpeting (DC), Gournadi Pourashava, District : Barishal 1.4980 158.691 M/S Howleder Enterprise 158.691 01/12/2020 30/06/2022 100 07/10/2024
9 UIIP-BC/PCO/W-136 (A) Improvement of road from Torki Omor Roy House Bridge to Profullo Chokroborti House Ch 0.00m to 775m by Bituminous Dense Carpeting DC Gournadi Pourashava District Barishal. (B) Rehabilitation of BC road from Torki High School to Kali Khola ch 0.00m to 450m by Bituminous Dense Carpeting DC with Three U-Drain Under Gournadi Pourashava District Barishal. (C) Improvement of road from Sundardi Abdul Mozid Pre-Cadet School to Md. Alomgir Shikder house Ch 0.00m to 558m by Bituminous Dense Carpeting DC Gournadi Pourashava District Barishal. (D) Rehabilitation of BC road from Torki Bandor Goat Market to Anondopur Bridge Ch 0.00m to1328m by Bituminous Dense Carpeting DC Gournadi Pourashava District Barishal. 3.1110 161.729 M/S Howleder enterprise 161.729 03/11/2020 30/06/2022 100 07/10/2024
10 UIIP-BC/PCO/W-234 (a) Improvement of road from Ashokathi Bazar to Rasel Councilor House (Ch 0.00m to 510m) by Bituminous Dense Carpeting (DC), Gournadi Pourashava, District : Barishal (b) Repairing of BC road from Ashokathi Kacha Bazar to Gerakul Joshim's Shop (Ch 0.00m to 1470m) by Bituminous Dense Carpeting (DC), Gournadi Pourashava, District : Barisha (c) Rehabilitation of BC road from Ashokathi Filling Station to Gerakul Govt. Primary School (Ch 0.00m to 1315m) by Bituminous Dense Carpeting (DC), Gournadi Pourashava, District : Barishal 3.2950 128.151 M/S Howleder Enterprise 128.151 01/12/2020 30/06/2022 100 27/09/2022 0.02% Less, Recast done Progress is less for the Scheme No. (b) & (c) due to negligence of the assigned Contractor
11 UIIP-BC/PCO/W-137 (A) Improvement of road from Boro Kasba R&H to West side of Allah Mosque via Ex-Counsilor Alebali House Ch 0.00m to 480m by Bituminous Dense Carpeting DC with One U-Drain Gournadi Pourashava District Barishal. (B) Rehabilitation of BC road from Torki Cow Hat to Firoz Howlader House Tin Kona Via Sazol Kazi Counsilor House ch 0.00m to 825m by Bituminous Dense Carpeting DC Under Gournadi Pourashava District Barishal.(C) Improvement of road from Gournadi Goinaghata Bridge to Gournadi Bondar Katcha Bazar via Abdur rob Serniabad Hostel Ch 0.00m to 930m by Bituminous Dense Carpeting DC with Four U-Drain Gournadi Pourashava District Barishal. 2.2400 149.298 M/S Howleder Enterprise 149.298 03/11/2020 30/06/2022 100 27/09/2022 0.01% Less, Recast done (Time Extended)
3 Muladi
1 UIIP/PCO/G-36 Implementation & Supply 439 nos Waste Basket (120 ltr) & 30 nos Non-motorized vehicle (van) under Muladi Pourashava District: Barishal. 39.976 RFL Plastrics Limited 39.976 0 08/10/2024
2 UIIP-BC/PCO/W-555 (A) Improvement of RCC Road from Boro Mosque Delwar Shop To Graveyard (Ch. 0.00-105 m) at ward no. 06 Under Muladi Pourashova District. Barishal. (B) Improvement of RCC Road from Main Road To H/O Ketab Ali Bapary/Jakir Bapary (Ch. 0.00-160 m) at ward No.02.Under Muladi Pourashava District Barishal. (C) Improvement of RCC Road from Main Road Shah Alam Kha House To Habib Sikder (Paner Bor) (Ch. 0.00-305m) at ward No.03.Under Muladi Pourashava District Barishal. (D) Improvement of RCC Road from Main Road To H/O Khalek Kha To Masud Mollah (Ch. 0.00-100m) ward No.04.Under Muladi Pourashava District Barishal. (E) Improvement of RCC Road from CMB To Ajom Bapary & Bappy House (Ch. 0.00-320m) at ward No.07.Under Muladi Pourashava District Barishal. (F) Improvement of RCC Road from Main Road To H/O Shipu Kha (Ch. 0.00-250 m) at ward No.02.Under Muladi Pourashava District Barishal. 1.2890 206.230 AKA-PC (JV) 206.230 12/06/2023 05/06/2024 100 08/10/2024
3 UIIP-BC/PCO/W-416 A) Construction of RCC Road Starting from Bosar Howlader House To Kazi Kamal House Ch. 0.00-350 m.Ward No.09.Under Muladi Pourashava District Barishal. B) Construction of RCC Road Starting from Arif Shop To Praimary School Ch. 0.00-385m.Ward No.06 Under Muladi Pourashava District. Barishal. 0.7350 123.609 M/S. DEIP ENTERPRISE 123.609 23/01/2022 16/01/2023 100 08/10/2024 0.23% Less
4 UIIP-BC/PCO/W-419 A) Constructin Of 1-Vent 4.00 X4.00m Rcc Box Culvert on Mira Bari Canel.In Ward No.06.Under Muladi Pourashava B) Constructin Of 1-Vent 4.00 X4.00m Rcc Box Culvert on Akkas Howlader Canel Ward No.06 Under Muladi Pourashava C) Constructin Of 1-Vent 3.00 X3.00m Rcc Box Culvert on Monosagong Ghat Canel Ward No.01 Under Muladi Pourashava D) Constructin Of 1-Vent 4.00 X4.00m Rcc Box Culvert on Babul Sardar House Canel Ward No. 08 Under Muladi Pourashava 88.724 M/S Al Mamun Entr. 88.724 14/12/2021 06/12/2022 100 27/09/2022 0.17% Less
5 UIIP-BC/PCO/W-418 Construction Of RCC Drain starting from Dhali Market To East Bajar Ward No-06 Under Muladi Pourashava. Ch.0.00-336m 58.600 M/S. DEIP ENTERPRISE 58.600 14/12/2021 06/12/2022 100 27/09/2022 0.63% Less
6 UIIP-BC/PCO/W-417 A) Construction Of RCC Drain starting from Mithur Bari Culvert To Canel Ward No-04 Under Muladi Pourashava.Ch.0.00-306m B) Construction Of RCC Drain starting from Poura Kitchen Market To Kheya Ghat Ward No-06 Under Muladi Pourashava Ch.0.00-400m 123.096 m/s Khan Abdus Sabur 123.096 14/12/2021 06/12/2022 100 27/09/2022 0.14% Less
7 UIIP-BC/PCO/W-415 A.Construction Of Rcc Road starting from Mira Bari Mosque To Bapary bari House End of River. Ward No.06.Under Muladi Pourashava.Ch.0+00-0+410m.l. B.Rehabilitation Of BC Road Strarting from Terochar Madrasha To Farid Howlader House Ch. 0.00-560m.by Bituminous Dense Carpeting.Ward No.02 Under Muladi Pourashava District. Barisha 0.9700 98.442 M/S KHAN ABDUS SABUR 98.442 23/01/2022 16/01/2023 100 27/09/2022 0.17% :Less
8 UIIP-BC/PCO/W-232 01.Construction of RCC Road in Mollah Bazar Bridge To Rastar Matha End Of The River Via Vranir Khal.In Ward No.03.Under Muladi.Pourashava.Ch.000-0820m. 02.Construction of RCC Road in Boroi Tola To Salam mal House Via Sardar Bari.In Ward No.07.Under Muladi Pourashava.Ch.000-0645m. 1.4650 135.557 M/S KHAN ABDUS SABUR 135.557 07/12/2020 06/12/2020 100 27/09/2022 0.25% Less
9 UIIP-BC/PCO/W-231 01.Construction Of Rcc Road In East Side of Taltola Bajar To Anwar Shikder House.In Ward No.08.Under Muladi Pourashava.Ch.000-0813.(Salvage Tk=196102.00) 02.Construction of RCC Road in Main Road To Atik House House.In Ward No.02.Under Muladi Pourashava.Ch.000-0450m.(Salvage Tk=129515.00) 1.2630 120.245 M/S KHAN ABDUS SABUR 120.245 07/12/2020 06/12/2021 100 27/09/2022 0.21% Less
10 UIIP-BC/PCO/W-116 01.Construction of RCC Road in Launch Ghat To Brick Field Via Mosque In Ward No.05.Under Muladi Pourashava.Ch.000-0780m. 02.Construction of RCC Road in GP Tower To CMB Road Via Sopon House In Ward No.07.Under Muladi.Pourashava.Ch.000-0450m. 1.2300 112.739 M/S Rupali Construction 112.739 13/08/2020 12/08/2020 100 27/09/2022 0.20% Less
11 UIIP-BC/PCO/W-115 01.Construction of RCC Road in CMB Road To Poura Border.In Ward No.07.Under Muladi.Pourashava.Ch.000-0892m 02.Construction of RCC Road in Siklone Centre To Stadium.In Ward No.04.Under Muladi Pourashava.Ch.000-0450m. 1.3420 119.403 M/S Rupali Construction 119.403 12/08/2021 100 27/09/2022 3.98% above, Revised done
Total : 29.6440 (Km) 3741.62 (Lac) 3741.62 (Lac)