Towns Integrated Flood Protection (Phase-II) Project
Kushtia Pourashava District: Kushtia
Invitation for Tender (Works)
Tender Notice Number :
03/2010-2011
Memo No. KP/XEN/2010/434 Date:
11/08/2010
1.
|
Government of the People’s Republic of Bangladesh
has received a Loan from Asian Development Bank (ADB) & Organization of Petroleum Exporting Countries
(OPEC),
towards the cost of Secondary Towns Integrated Flood Protection
(Phase-2) Project-LGED Part, and it is intended that part of the proceeds of
this loan will be applied to eligible payments under the contract for the
works as mentioned in para-2. Bidding is open to all bidders from eligible
source countries of the Asian Development Bank.
|
2.
|
The Executive
Engineer, Kushtia Pourashava, Kushtia now
invites sealed tenders from eligible tenderer for the purpose of the following
works:
|
Tender Package No.
|
Name of Works
|
Tender security (Tk.)
|
Time for completion (days)
|
Price of tender documents (Non-Refundable)
(Tk.)
|
STIFPP-II/LGED/ KUS/10/DW-20
|
Construction of RCC
drain from:
a) M.A Rahim road box
culvert to Housing “C” Block outfall drain (Ch.0+00-0+055m);
b) Khodadad Khan road
Police Club Eid Ghah Field to BWDB, SDO-02 outlet (Ch.0+00-0+090m);
c) Purna Chandra Lahiri
road from RCRC road to Mazarpur Rail gate RHD road side drain (Total
Length=780m);
d) Babor Ali Rail (Sonali
Bank) to Rajar hat more outfall drain (Ch.0+00-0+0785m); with a link
(Ch.0+00-0+510m) (Total Length 2220m); Kushtia Pourashava, Kushtia.
|
4,80,000.00
|
150
|
12,000.00
|
STIFPP-II/LGED/ KUS/10/DW-21
|
Construction of RCC
drain start from:
a) Girzanath Mozumder
road side drain from Dadapur road to DW-18 outfall drain with link drain
(Total length=1485m);
b) Azizul Jali road
(North side) from DPHE road side STIDP-1 outfall drain with link drain (Total
length=1100m);
c) Railing a`Mm& (i)
Khodadad Khan road side drain from Police Club to BWDB SDO-0 Sluice gate
(Total length=350m);
c) (ii) Comrade Rawshan
Ali road side from Bozlar moar to Nishan mour (L=150m);
c) (iii) Nishan mour to
Housing “C&D” block divider road side drain (L-210m);
c) (iv) Customs mour to
Mollah Teghoria mour (L=350m);
c) (v) Gadon MIstry road
from Fultala mour to Vacational Training Institute (L=255m);
c) (vi) Hagda beel side
drain (L=95m). (Total Length Drain + Railing 3995m) Kushtia Pourashava,
Kushtia.
|
4,80,000.00
|
150
|
12,000.00
|
STIFPP-II/LGED/ KUS/10/DW-22
|
Construction of RCC
drain from:
a) Yousuf Ali Khan road
side from Mill Line Rail gate to Kaliganga
River (Ch.0+00-1+250m);
b) Lorance Lane road side
drain to Matin house to Chow. Kawser Uddin road side outfall drain
(Ch.0+00-0+350m);
c) Moti Miah Rail gate to
Chourhash Fultala RHD box culvert DW-13 outfall drain (Ch.0+00-0+965m);
(Total Length 2565m); Kushtia Pourashava, Kushtia.
|
5,00,000.00
|
150
|
13,000.00
|
STIFPP-II/LGED/ KUS/10/DW-23
|
Construction of RCC
drain from:
a) Raja Promoth
Bhusiondev Roy road (East & West side) from near Boro Bazar Rail gate to
Rajar hat mour outfall drain (Ch.0+00-0+700m);
b) M.A Rahim Super Market
to Bador Ali Rail gate to Mahatab Uddin Main drain with a links.(Length=
1250m); (Total Length 1950m) Kushtia Pourashava, Kushtia.
|
3,00,000.00
|
150
|
10,000.00
|
3.
|
Source of Funds
|
:
|
Asian
Development Bank (ADB), Organization of Petroleum Exporting Countries (OPEC)
& Government of Bangladesh
(GOB).
|
4.
|
Date, time and place of pre-tender meeting
|
:
|
Date:
25.08.2010, Time: 11.00AM and
Place:
Office of the undersigned
|
5.
|
Last date, time and places of selling tender
documents
|
:
|
Date:
05.09.2010, Time: 12.00Noon and
Places: Office
of the undersigned/The Executive Engineer, BWDB, Kushtia
/ Executive Engineer, LGED, Kushtia /The Superintendent of Police, Kushtia
/The Deputy Commissioner, Kushtia. /The Project Director, Secondary Towns
Integrated Flood Protection (Phase-2)Project,Level-7, LGED Building , LGED,
Dhaka.
|
6.
|
Last date, time and places of receiving tender
|
:
|
Date:
05.09..2010, Time: 12.00Noon and
Places:
Office of the undersigned/The Executive Engineer, BWDB, Kushtia
/ Executive Engineer, LGED, Kushtia / The Superintendent of Police, Kushtia
/The Deputy Commissioner, Kushtia.
|
7.
|
Date, time and place of opening of tender
|
:
|
Date:
05.09.2010, Time: 03.00PM and
Place:
Office of the undersigned
|
8.
|
Tender shall be valid
for a period of 120 (One hundred Twenty) days
after bid opening and must be accompanied by the tender security specified
above. Interested tenderer may purchase the tender documents or obtain
further information from the office as stated above & Office of the
undersigned.
|
9.
|
All tenders must be accompanied by a tender
security mentioned in Bangladesh Taka in the form of either Payment Order or
Bank Draft or Bank Guarantee for Tender Security from any Schedule Bank in favour of the Mayor, Kushtia Pourashava, Kushtia and must be delivered in accordance with the Instructions to Tenderers.
|
10.
|
The tenderer or their
authorized representatives are allowed to attend the opening of tenders
|
11.
|
The authority reserves the right to accept any
tender, or to accept any part of the tender, or to reject any or all the
tenders without assigning any reason thereof and in such case no compensation
will be entertained.
|
12.
|
This invitation for tender is available at the
website www.lged.gov.bd
And www.cptu.gov.bd.
|
|
|
|
|
|
|
|
|
Sd/=
(Md.
Rafiqul Islam)
Executive
Engineer &
Head
of IIS,PIU,STIFPP-2.