LGED Tender Banner

Government of the People’s Republic of Bangladesh

Local Government Engineering Department

Third Primary Education Development Program (PEDP-3)

Agargaon, Sher-e-Bangla Nagar, Dhaka-1207

 

Request for Expression of Interest (EOI) for Selection of Individual National Consultant

 

EOI Ref No:    LGED/PEDP-3/E-01/2012/6557                                                                                 Date: 19/09/2013

                The Local Government Engineering Department has been allocated public funds from the Government of the Peoples Republic of Bangladesh (GOB) toward the cost of the Third Primary Education Development Program (PEDP-3), and intends to apply part of the proceeds of these funds to payments under the contract for the provision of consultancy services for the project by an individual consultant (national).

 

                The services include and the qualification and experience required for the assignment is as follows:

Position

No of Post

Qualification

Experience

Project Management Consultant

1

B.Sc. in Civil Engineering

The candidates must have a minimum educational qualification of Graduation in Civil Engineering from a recognized institution. He should have total experience at least 20 years and minimum 15 years should be relevant experiences. Preference will be given having experiences in foreign aided projects.

 

                The Additional Chief Engineer (Maintenance), LGED now invites eligible Applicants to apply for the positions.  Applicants are invited to provide information indicating that they are qualified to perform the services (complete CV with other details as required in the TOR).

 

                A Consultant will be selected using the selection of individual consultant sub-method in accordance with the Public Procurement Rules 2008. It is expected that the services will be commenced on 1st November 2013 at LGED Bhaban, Agargaon, Dhaka-1207 and shall be completed on 30th October 2015.

                Interested consultants are required to submit their expressions of interest in accordance with the standard Application Forms which may be obtained from the office of the undersigned during normal office hours or available in the website: www.lged.gov.bd.

 

                Expressions of Interest shall be submitted by 3.00 pm on 21th October 2013, in sealed envelope delivered to Additional Chief Engineer (Maintenance), LGED and be clearly marked “Request for Expressions of Interest for Selection of Project Management Consultant”. Applicants who are already in employment shall have to send their application through proper channel. Otherwise their applications will not be considered. The procuring entity reserves the right to accept or reject any or all the EOI without assigning any reason whatsoever.

                                                                                                                                               

 

 

 

                                                                                                                                                (Md. Ashraful Haque)

Additional Chief Engineer (Maintenance)

                LGED Bhaban (Level-7)

Agargaon, Sher-e-Bangla Nagar, Dhaka-1207

 

Memo: LGED/PEDP-3/E-01/2012/6557/1(3)                                                                                                      Date:19/09/2013

Copy forwarded for kind information and necessary action:

1.        Chief Engineer, LGED, Agargaon, Sher-e-Bangla Nagar, Dhaka-1207.

2.        Superintending Engineer (Admin), LGED, Agargaon, Sher-e-Bangla Nagar, Dhaka-1207.

3.        Manager Advertisement, The Daily Star/The Daily Samakal,

(You are requested to publish the above EOI notice for one day on or before 28-09-2013)


 

 

 


GOVERNMENT OF THE PEOPLE’S REPUBLIC OF BANGLADESH

Local Government Engineering Department

Third Primary Education Development Program (PEDP-3)

Level-7, LGED Bhaban

Agargaon, Sher-e-Bangla Nagar, Dhaka-1207

 

 

 

Request for Application (RFA) For

Selection of Individual Consultant (National)

 

 

Name of Position: Project Management Consultant

 

 

Request for Application No.:

 

 

Issued To

:

 

 

 

 

 

 

EOI Ref. No. :                                            Date :

________________________________________________________

 

September 2013

Table of Contents

 

           ....................................................................................................................................................................................

A.       General 4

1.        Scope of assignment 4

2.        Qualifications of the Applicant 4

3.        Eligible Applicants. 4

4.        Corrupt, Fraudulent, Collusive or Coercive Practices. 5

5.        Conflict of Interest 5

B.       Preparation, Submission & Modification or Substitution of Applications 6

6.        Preparation of Application. 6

7.        Submission of Application. 6

C.       Evaluation of Applications 7

8.        Evaluation of applications. 7

9.        Application   Negotiations. 8

D.       Award of Contract 9

10.     Award of Contract 9

11.     Debriefing. 9

12.     Commencement of Services. 9

Section-2:  Terms of Reference. 10

Section-3:... Application Forms. 13

Form 3A: Application Submission. 14

Attachment:Form 3B. Curriculum Vitae (CV) of the Applicant 14

Form 3B. Curriculum Vitae (CV) of the Applicant 15

Form 3C. Indicative Remuneration & Expenses 16

Section-4.... Contract Forms. 17

4.1 Contract Agreement (Time-based) 18

General 18

1.        Services. 18

2.        Duration. 18

3.        Corrupt, Fraudulent, Collusive or Coercive Practices. 18

4.        Applicable Law.. 19

5.        Governing Language. 19

6.        Modification of Contract 19

7.        Ownership of Material 19

8.        Relation between the Parties. 19

9.        Contractual Ethics. 20

Payments to the Consultant 20

10.     Ceiling Amount 20

11.     Remuneration. 20

12.     Reimbursable. 20

13.     Payment Conditions. 21

Obligations of the Consultant 22

14.     Medical Arrangements. 22

15.     Working Hours and Leave. 22

16.     Performance Standard. 22

17.     Contract Administration. 22

18.     Confidentiality. 22

19.     Consultant’s Liabilities. 22

20.     Consultant not to be Engaged in Certain Activities. 22

Obligations of the Client 23

21.     Services, Facilities and Property. 23

Termination and Settlement of Disputes 23

22.     Termination. 23

23.     Dispute Resolution. 23

ANNEX A: Description of the Services 25

ANNEX B: Cost estimates of Services and Schedule of Rates 26

ANNEX C: Consultant’s Reporting Obligations 27

Government of the People’s Republic of Bangladesh. 28

 


Section-1.  Information to the Applicants

 

A.    General

 

1.    Scope of assignment

1.1          The Client has been allocated Public fund for Third Primary Education Development Program (PEDP-3) and intends to select an Individual Consultant for the specific assignment as specified in the Terms of Reference  in Section 2.

2.    Qualifications of the Applicant

2.1         Prospective Individuals shall demonstrate in their Applications that they meet the required qualifications and experiences and are fully capable of carrying out the assignment.

 

2.2         The capability of Individuals shall be judged on the basis of academic background, experience in the field of assignment, and as appropriate, knowledge of the local conditions, as well as language and culture.

[ Minimum educational qualifications, required experience have been mentioned in Terms of reference  in Section 2 ]

3.    Eligible Applicants

3.1          Any Bangladeshi national including persons in the service of the Republic or the local authority / Corporations is eligible to apply for the positions 

 

3.2          Government officials and civil servants including individuals from autonomous bodies or corporations while on leave of absence without pay are not being hired by the agency they were working for immediately before going on leave and, their employment will not give rise to Conflict of Interest, pursuant to Rule 112 (9) of the Public Procurement rules, 2008

 

3.3          Persons who are already in employment in the services of the Republic or the local authorities/ Corporation etc must have written certification from their employer confirming that they are on leave without pay from their official position and allowed to work full-time outside of their previous official position. Such certification shall be provided to the Client by the Consultant as part of his/her Applications

 

3.4          No person who has been convicted by any Court of Law or dismissed from Services for misconduct shall be eligible for consideration for appointment to a post.

 

3.5          The Applicant has the legal capacity to enter into the Contract

 

3.6          The Applicant has fulfilled its obligations to pay taxes and social security contributions under the relevant national laws.

 

3.7          The Applicant shall not be under a declaration of ineligibility for corrupt, fraudulent, collusive or coercive practices in accordance with Sub-Clause 4.2.

 

3.8          The Applicant shall not have conflict of interest pursuant to the Clause 5 

4.    Corrupt, Fraudulent, Collusive or Coercive Practices

4.1          The Government requires that Client, as well as Applicants, shall observe the highest standard of ethics during the implementation of procurement proceedings and the execution of Contracts under public funds.

 

4.2          The Government defines corrupt, fraudulent, collusive or coercive practices, for the purposes of this provision, in the Contract Agreement Sub-Clause 3.4

 

4.3          Should any corrupt, fraudulent, collusive or coercive practice of any kind come to the knowledge of the Client, it shall, in the first place, allow the Applicant to provide an explanation and shall, take actions only when a satisfactory explanation is not received.

 

4.4          If the Client at any time determines that the Applicant has, directly or through an agent, engaged in corrupt, fraudulent, collusive or coercive practices in competing for, or in executing, a Contract under public funds., the Client shall:

(a)        exclude the Applicant from participation in the procurement proceedings concerned or reject an Application for award; and

(b)         Declare the Applicant ineligible, either indefinitely or for a stated period of time, from participation in procurement proceedings under public funds.

5.    Conflict of
Interest

5.1         Government policy requires that the Applicant provide professional, objective, and impartial advice, and at all times hold the Executing Agency’s (Client's) interests paramount, without any consideration for future work, and strictly avoid conflicts with other assignments or their own corporate interests.

 

5.2         The Applicant shall not be hired for any assignment that would be in conflict with their prior or current obligations or that may place them in a position of not being able to carry out the assignment in the best interest of the Client.

 

5.3         Pursuant to Rule 55 of the Public Procurement Rule 2008, the Applicant has an obligation to disclose any situation of actual or potential conflict of interest that impacts on his capacity to serve the best interest of his Client, or that may reasonably be perceived as having this effect. Failure to disclose said situations may lead to the disqualification of the Applicant or the termination of its Contract.

 

5.4         The Applicant that has a business or family relationship with a member of the Client’s staff may not be awarded a Contract, unless the conflict stemming from this relationship has been addressed adequately throughout the selection process and the execution of the Contract.

 

 

B.   Preparation, Submission & Modification or Substitution of Applications

 

6.    Preparation of Application

6.1          Applications shall be typed or written in indelible ink in English language and shall be signed by the Applicant. Applicants are required to complete  the following Forms:

(a)         Form 3A: Application Submission Form;

(b)         Form 3B: CV of the Applicant; and

(c)         Form 3C: Remuneration and Reimbursable 

 

 

6.2          The Remuneration and reimbursable are purely indicative and are subject to negotiations and agreement with the Client prior to finalisation of the Contract.

 

7.    Submission of Application

7.1          Pursuant to Rule-113(5) of the Public Procurement Rules, prospective Applicants can deliver their Application by hand, mail, courier service to the address mentioned in the request for Application advertisement.

 

 

7.2          Application shall be properly sealed in envelopes addressed to the Client as mentioned in the request for Application advertisement and bear the name & address of the Applicant as well as the name of the assignment.

 

 

7.3          In case of hand delivery, the Client, on request, shall provide the Applicant with a receipt.

 

 

7.4          The closing date for submission of Application is [insert date] up to [insert time] Applications must be submitted within this deadline. Any Application received after the deadline for submission of Applications shall be declared late, and returned unopened to the Applicant.

 

 

7.5           Applications may be modified or substituted before the deadline for submission of Applications.

 

 

7.6          The Client may at its sole discretion, extend the deadline for submission of Applications.

 

7.7          At any time prior to the deadline for submission of Applications the client for any reason on its own initiative may revise the Request for Application Document by issuing an Addendum which shall form an integral part of the Document.

 

C.  Evaluation of Applications

 

8.    Evaluation of applications

8.1          Suitability of the Applicants shall be rated by evaluation on the basis of their academic background, relevant Working Experience and its adequacy for the assignment, knowledge of local conditions as well as language.

 

8.2          The points to be given under each of the evaluation Criteria are:

 

 

Criteria

Points

 

·         Educational Qualification                                                                                                          

20  points

 

 

·         Relevant Working Experience and its adequacy for the assignment

65 points

 

·         Suitability considering age, skill (such as training, computer skills, proficiency in English and Bengali languages and others).

10 points

 

Total points:

95  points

 

 

8.3          Applicants thus given points as stated under Clause 8.2, not securing the minimum qualifying points not less than 70 shall be considered disqualified.

 

8.4          Applications shall be evaluated by the PEC, who shall prepare a short-list of maximum seven (7) Applicants

 

8.5          The qualified short-listed Applicants as stated under Clause 8.4 shall be invited for an interview to test their aptitude and presentation by the PEC and shall be rated with five (5) points.

 

8.6           Points already secured by the Applicants in the evaluation as stated under Clause 8.5, shall be combined with the points obtained in the interview and a list of maximum three (3) most suitable Applicants ranked in order of merit (1-2-3) shall be prepared.  

 

8.7          In pursuant to Rule 114 of the Public Procurement Rules 2008, there shall be no public opening of Applications.

 

8.8          The Client shall immediately after the deadline for submission of Application convene a meeting of the Proposal Opening Committee(POC)

 

8.9          The POC, having completed the record of opening, shall send the Applications received and the opening record to the PEC.

 

8.10     Following the opening of the Applications, and until the Contract is signed, no Applicant shall make any unsolicited communication to the Client. Such an attempt to influence the Client in its decisions on the examination, evaluation, and comparison of either the Applications or Contract award may result in the rejection of the Application.

9.    Application   Negotiations

9.1        The first-ranked Applicant stated under Clause 8.5 shall then be invited for negotiations, pursuant to Rule 122 of the Public Procurement Rule, 2008 at the address of the client.

 

9.2        If this fails, negotiate with the second-ranked Applicant, and if this fails negotiate with the third-ranked Applicant, with the hope that successful negotiations are concluded

 

9.3        During negotiations, the Client and the Applicant shall finalize the “Terms of Reference”, work schedule, logistics and reporting schedule etc. These documents shall then be incorporated into the Contract as Description of Services”

 

9.4        The Financial negotiations will involve the remuneration and other reimbursable cost to be paid to the Applicant.

 

9.5        Negotiations will conclude with a review of the draft Contract. To complete negotiations the Client and the Applicant will initial the agreed Contract.

 

 

D.  Award of Contract

 

10.  Award of Contract

10.1     After completing negotiations and having received the approval to award the contract, the Client shall sign the Contract with the selected Applicant.

11. Debriefing

11.1      After signature of the Contract, the Client shall promptly notify other Applicants that they were unsuccessful.

 

11.2      The Client shall promptly respond in writing to any unsuccessful Applicant who request the client in writing to explain on which grounds its application was not selected.

12. Commencement of Services

12.1      The applicant is expected to commence the assignment on 1st November 2013 at LGED Bhaban, Agargaon, Dhaka 1207. The duration of the contract shall be 24 Months from the date of commencement.

 

 


 

Section-2:  Terms of Reference

 

 

 

 

(a)          Background and General Description

Primary Education Development is being carried out since inception of Bangladesh following global and national policies such as Millennium Development Goal (MDG), Constitutional of Bangladesh, National Perspective Plan, Sixth Five Year Plan (SFYP), National Education Policy etc. Series of development projects/programs were/are being carried out following that. Third Primary Education Development Program (PEDP-3) has been incepted since 1st July 2011 for a period of five years following successful completion of PEDP-2. There are many stakeholders under PEDP-3. LGED under Local Government Division (LGD) of Ministry of Local Government, Rural Development and Co-operatives (MoLGRD&C) is responsible for reconstruction, construction of additional class room, primary education offices, maintenance and supply of furniture.

LGED is seeking an experienced professional to assist in Third Primary Education Development Program (PEDP-3) as well as in overall management of LGED activities. This position is initially a fixed-term position for two years and could be renewed if needed and warranted by the candidate’s performance.

Our Strategic Objectives:                                               

§   Development of Rural, Urban, Small Scale Water Resources and Primary Education infrastructure;

§   Provide Technical Assistance to Rural and Urban Local Government Institute;

§   Provide Technical Assistance to other ministries such as Ministry of Primary and Mass Education (MoPME);

§   Support policies and interventions that promote growth rate, reduce poverty, inequality and vulnerability; promote gender equity, and empower the poor;

§   Ensure Transparency, Accountability and Good Governance in carrying out own mandate.

Our Values:

*      Focusing on results on the ground;

*      Improve human living standard through development and maintenance of infrastructure;

*      Ensure child friendly / social-environment friendly / hill friendly / gender sensitive and climate resilient infrastructure for quality primary education;

*      Being collaborative and innovative;

*      Forging partnerships with the public and private sectors;

*      Being at the frontier of knowledge in our areas of expertise.

(b)          Objectives of  Services Required

The objective of the services of Project Management Consultant is to appraise infrastructure development activities in on-going programs/projects under DPE, Assist Additional Chief Engineer (Maintenance) to carry out all preparatory works needed for infrastructure development activities under MPOME, Assist in Monitoring infrastructure development activities under MOPME; Assist and advise the Chief Engineer, LGED in overall management of LGED activities; Updating CE, LGED about the current status of all projects and program of LGED and Identify problems, weaknesses and critical gaps in LGED ongoing activities and advise CE, LGED for problem shooting.

 

(c)          Scope of The Services Required ( Duties And Responsibility)

Project Management Consultant will appraise and monitor infrastructure development activities under MoPME, assist in all preparatory works as well as preparation of guidelines/formats/checklists and different sort of reports. Besides these, PMS will assist CE, LGED in monitoring LGED activities, preparation of Annual Progress Report and other reports as and when required.

The individual consultant in the capacity of Project Management Consultant will provide consultancy service in areas of planning, monitoring, reporting and evaluating primary schools construction works as well as assist Chief Engineer, LGED in monitoring LGED activities and in adopting remedial measures as and when required. The consultant will perform his duties in accordance with acceptable professional standard, utilizing sound engineering, management and economic practices of national standard. The assignments of Project Management Consultant will include, but not limited to, the following:

 

1.            Work under the direct supervision of the Chief Engineer and work in close coordination with Project Management Unit (PMU), LGED for MOPME delegated works.

2.            Keep close liaison with Chief Engineer LGED for different activities of LGED projects/programs and update him with the progress and problems time to time.

3.            Assist CE, LGED in evaluation of projects/programs.

4.            Suggest remedial measures against problems and Action Plan for timely completion of LGED mandate with desired quality.

5.            Prepare progress report, brochure, and speeches, supplementary to be published in national dailies as and when required.

6.            Prepare paper and presentation for seminar/workshop as well as documentation of those.

7.            Provide LGED overall assistance and guidance for efficient management and smooth implementation of the Primary Education Infrastructure Development. 

8.            Assist in preparation of reports, documents, formats and checklist for smooth implementation of PEDP-3 and other projects of MOPME being implemented by LGED.

9.            Advise and assist LGED in the preparation of yearly planning and implementation program.

10.          Review the progress of the project/program at LGED head quarter/Divisional level/District level, identify the problems/bottlenecks and suggest action for mitigation.

11.          Add better technical expertise in the existing management of LGED and PEDP leading to better management.

12.          Promote LGED with suitable and better management policy to face and manage ever increasing work pressure including associated with the existing LGED management.

 

The Project Management Consultant will report to the Chief Engineer, LGED.  He will work closely with Additional Chief Engineer (Maintenance), LGED and Superintending Engineer (PEDP), LGED.

 

 

(d)          Selection Criteria

Candidates meeting the following requirements are encouraged to apply:

 

·               Minimum Educational Qualifications: B.Sc. Engineering (Civil)

·               Minimum Overall Experience: 20 Years;

·               Minimum 15 years experience in the relevant filed;

·               Close familiarity with development activities specially Foreign Aided Projects Activity at local level;

·               Adequate knowledge about LGED development activity particularly in Primary Education Development Program;

·               Familiarity with relevant institutions, the sources of economic data in Bangladesh;

·               Excellent analytical and communications skills and ability to write clearly and concisely;

·               Strong interpersonal skills and ability to work effectively in a team-based environment and under tight time constraints;

·               Ability to provide the full range of operational assistance with independent responsibility;

·               Ability to build effective working relations with Client’s and colleagues.

 

(e)          Indicative Work Program and Location(s) of various activities to be carried out by Consultant

The Project Management consultant’s office shall be within LGED Bhaban at Sher-e-Bangla Nagar, Agargaon, Dhaka-1207. He will work closely with Chief Engineer, Additional Chief Engineer (Maintenance) and Superintending Engineer (PEDP), LGED.

 

His works shall be within and not limited to as mentioned above. He will have to attend meeting with relevant stakeholder at Dhaka and regional levels.

 

 

Section-3:    Application Forms

 

                       

 

 

 

 

 

 

 

Form 3A  : Application Submission Form

 

                Form 3B  : CV of the Applicant

 

                        Form 3C: Remuneration and Reimbursable  

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 


Form 3A: Application Submission

 

                                                                                                                           Date:  ..................

 

To

The Additional Chief Engineer (Maintenance)

Local Government Engineering Department

Level-7, LGED Bhaban, Agargaon

Sher-e-Bangla Nagar, Dhaka-1207

 

 

Dear Sirs:

 

I am hereby submitting my Application to provide the consulting Services for Project Management Consultant in strict accordance with your Request for Application dated ........................

I declare that I was not associated, nor have been associated in the past, directly or indirectly, with a Consultant or any other entity that has prepared the design, specifications and others documents in accordance with Clause 5.

I further declare that I have not been declared ineligible by the Government of Bangladesh on charges of engaging in corrupt, fraudulent, collusive or coercive practices in accordance with Clause 4.

I undertake, if I am selected, to commence the consulting Services for the assignment not later than the date indicated in Clause 12.1.

I understand that you are not bound to accept any Application that you may receive.

I remain,

Yours sincerely,

                                    Signature           :

                                    Name                :

                                    Address             :

                                    Telephone          :

 

Attachment:

Form 3B. Curriculum Vitae (CV)
of the Applicant

1

PROPOSED POSITION FOR

THIS PROJECT                                    :

Project Management Consultant

2

NAME OF PERSON                             :

[state full name]

3

DATE OF BIRTH                                 :

[ dd/mm/yy]

4

NATIONALITY                                   :

 

5

MEMBERSHIP IN PROFESSIONAL

SOCIETIES                                        

[state rank and name of society and year of attaining that rank].

6

EDUCATION                                     

[list all the colleges/universities which the Applicant  attended, stating degrees obtained, and dates, and list any other specialised education of the Applicant ].

7

OTHER TRAINING

[indicate significant training since degrees under EDUCATION were obtained, which is pertinent to the proposed tasks of the Consultant].

8

LANGUAGES & DEGREE OF

PROFICIENCY

Language

Speaking

Reading

Writing

 

e.g. English

Fluent

Excellent

Excellent

9

COUNTRIES OF WORK EXPERIENCE

 

10

EMPLOYMENT RECORD

[starting with present position list in reverse order [every employment held and state the start and end dates of each employment]

[The Applicant should clearly distinguish whether as an “employee” of the firm or as a “Consultant” or “Advisor” of the firm].

[The Applicant should clearly indicate the Position held and give a brief description of the duties in which the Applicant was involved].

 

EMPLOYER 1

FROM: [e.g. January 1999]

TO: [e.g. December 2001

 

EMPLOYER 2

FROM:

TO:

 

EMPLOYER 3

FROM:

TO:

 

EMPLOYER 4 (etc)

FROM:

TO:

11

WORK UNDERTAKEN THAT BEST ILLUSTRATES THE CAPABILITY TO HANDLE THIS ASSIGNMENT

[give an outline of experience and training most pertinent to tasks on this assignment, with degree of responsibility held. Use about half of a page A4].

12

COMPUTER SKILL

 

 

CERTIFICATION

[Do not amend this Certification].

I, the undersigned, certify that (i) I was not a former employee of the Client immediately before the submission of this proposal, and (ii) to the best of my knowledge and belief, this CV correctly describes myself, my qualifications, and my experience. I understand that any wilful misstatement described herein may lead to my disqualification or dismissal, if engaged.

                                                                                    Signature           :

 

                                                                                    Print Name        :

                                                                                    Date of Signing  :

                                                                                    dd/mm/yyyy      :

 

 


Form 3C. Indicative Remuneration & Expenses

 

 

The Consultant should provide an indication of the remuneration as per the format shown below. This will not be used for evaluation of the Consultant’s Application but solely for the purposes of Application Negotiations to be held as stated in Clause 9.1 .

 

(1)               Remuneration

 

Rate

(per month / day / hour in Tk)

Staff Time

(No. month / day / hour)

Total (Tk)

 

 

 

Note: A month consists of 30 calendar days.

 

(2)                           Reimbursable (as applicable)

 

 

Rate per unit

Total unit

Total Amount (Tk)

(a)      Per Diem Allowance

 

 

 

(b)      Air Travel Costs

 

 

 

(c)      Other Travel Costs

        (state mode of travel)

 

 

 

(d)      Communication charges

 

 

 

(e)      Reproduction of Reports

 

 

 

(f)       Other Expenses (to be listed)

 

 

 

 

 

 

 

 

 

Sub-total

 

 

 

CONTRACT CEILING (1) + (2)

 

 

 

 

 

 

 

 

 

 

 

 

 


 Section-4.   Contract Forms

 

 

 

 

 

 

 

 

 

The Contract Agreement, which once completed and signed by the Client and the Consultant, clearly defines the Client’s and Consultants’ respective responsibilities.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

           

4.1 Contract Agreement (Time-based)

 

THIS CONTRACT (“the Contract”) is entered into this day of [dd/mm/yy], by and between [insert name of Client] (“the Procuring Entity”) having its office at [insert address of Client], and [insert name of Consultant] (“the Consultant”) having his/her address at [insert address of Consultant].

 

WHEREAS, the Client wishes to have the Consultant performing the Services hereinafter referred to, and

WHEREAS, the Consultant is willing to perform these Services,

NOW THEREFORE THE PARTIES hereby agree as follows:

General

1.           Services

1.1       The Consultant shall perform the Services specified in Annex A (Description of Services), which are made an integral part of the Contract.

2.           Duration

2.1       The Consultant shall perform the Services during the period commencing from [dd/mm/yy] and continuing until [dd/mm/yy], or any other period as may be subsequently agreed by the parties in writing.

3.           Corrupt, Fraudulent, Collusive or Coercive Practices

3.1       The Government requires that Client , as well as Applicants, shall observe the highest standard of ethics during the implementation of procurement proceedings and the execution of Contracts under public funds.

 

3.2       The Government defines corrupt, fraudulent, collusive or coercive practices, for the purposes of this provision, in the  Sub-Clause 3.5

 

3.3       Should any corrupt, fraudulent, collusive or coercive practice of any kind come to the knowledge of the Client, it shall, in the first place, allow the Applicant to provide an explanation and shall, take actions only when a satisfactory explanation is not received.

 

3.4       If the Client at any time determines that the Applicant has, directly or through an agent, engaged in corrupt, fraudulent, collusive or coercive practices in competing for, or in executing, a Contract under public funds., the Client shall:

(a)        exclude the Applicant from participation in the procurement proceedings concerned or reject an Application for award; and

(b)         declare the Applicant ineligible, either indefinitely or for a stated period of time, from participation in procurement proceedings under public funds.

 

3.5       The Government defines, for the purposes of this provision, the terms set forth below as follows:

“corrupt practice” means offering, giving or promising to give, receiving, or soliciting either directly or indirectly, to any officer or employee of a Client or other public or private authority or individual, a gratuity in any form; employment or any other thing or service of value as an inducement with respect to an act or decision or method followed by a Client in connection with a Procurement proceeding or Contract execution;

“fraudulent practice” means the misrepresentation or omission of facts in order to influence a decision to be taken in a  Procurement proceeding or   Contract execution;

“collusive practice” means a scheme or arrangement between two (2)  or more Persons, with or without the knowledge of the Client, that is designed to  arbitrarily reduce the number of Tenders submitted or fix Tender prices at artificial, non-competitive levels, thereby denying a Client the benefits of competitive price arising from genuine and open competition; or

“coercive practice” means harming or threatening to harm, directly or indirectly, Persons or their property to influence a decision to be taken in the Procurement proceeding or the execution of a Contract, and this will include creating obstructions in the normal submission process used for Tenders, Applications, Proposals or Quotations.

4.           Applicable Law

4.1       The Contract shall be governed by and interpreted in accordance with the laws of the People’s Republic of Bangladesh

5.           Governing Language

5.1       The language governing the Contract shall be English, however for day to day communications in writing both Bangla and English may be used.

6.           Modification of Contract

6.1       The Contract shall only be modified by agreement in writing between the Client and the Consultant.

7.           Ownership of Material

7.1       Any studies, reports or other material, graphic, software or otherwise, prepared by the Consultant for the Client under the Contract shall belong to and remain the property of the Client.

 

7.2       The Consultant may, with the prior written approval of the Client, retain a copy of such documents and software, but shall not use them for purposes unrelated to the Contract.

8.           Relation between the Parties

8.1       Nothing contained in the Contract shall be construed as establishing or creating any relationship other than that of independent Consultant between the Client and the Consultant.

9.           Contractual Ethics

9.1       No fees, gratuities, rebates, gifts, commissions or other payments, other than those shown in the Contract, shall have been given or received in connection with the selection process or in the contract execution.

Payments to the Consultant

 

10.       Ceiling Amount

10.1       The Client shall pay the Consultant for the Services rendered pursuant to  ‘Description of Services’ ‘a ceiling amount not to exceed Tk [insert amount], which includes remuneration and reimbursable expenses as set forth in Clauses 10.2. These amounts have been established based on the understanding that it includes all of the Consultant’s costs as well as any tax obligation that may be imposed on the Consultant.

 

10.2       The composition of the Remuneration and Reimbursable which make up the ceiling amount are detailed in Annex B

11.       Remuneration

11.1        The Client shall pay the Consultant for Services rendered with the rates agreed and specified in ANNEX B  Cost estimates for Services and Schedule of Rates”. Remuneration rates shall be on monthly/daily/hourly [ delete those inappropriate ]

11.2        Monthly Rate:  The time spent in performing the Services shall include travel time, weekends and public holidays, and to the extent specified in Clause 15.2 shall also include periods of casual leave and sick leave. In cases where only part of a month is worked then remuneration shall be computed by dividing the monthly rate by 30 and multiplying by the number of days worked i.e. time spent (as described above) during that month;

                    or

 

Daily rate: The time spent in performing the Services shall be determined solely on the basis of the number of days actually worked by the Consultant, and shall include travel time, but not weekends, public holidays, casual or sick leave

                    or

 

Hourly rate: The time spent in performing the Services shall be determined solely on the basis of the number of hours actually worked by the Consultant, and shall include travel time, but not weekends, public holidays, casual or sick leave.

12.       Reimbursable

12.1        Per Diem Allowance:  The Consultant shall, when performing the Services away from the duty station, be entitled to per diem allowance in accordance with the agreed per diem rates.

 

12.2        Travel Costs: The Consultant shall, when performing the Services away from the duty station, be entitled to travel costs in accordance with the agreed   travel costs.

 

12.3        Other Expenses: The Consultant shall, when performing the Services, be entitled to reimbursement of any other expenses as detailed in Annex B.

 

12.4        For other reasonable reimbursable expenses not falling within the above three categories, but which may arise during performance of the Services, such expenses will only be reimbursed by the Client as it may at its sole discretion approve, subject to available of budget.

13.       Payment Conditions

13.1        Currency: Payments shall be made in Bangladesh Taka by the end of each calendar month or within fifteen (15) calendar days of receipt of the Invoice as the case may be.

13.2        Advance Payment: The Consultant shall, if he/she so requests, be entitled to a total advance payment, as specified in Annex B, to cover his/her out-of-pocket expenses which are to be recovered in equal installments from monthly amounts due to him/her.

[For aid funded procurement Advance Payments may be applicable. However, for 100% GOB funded procurement Advance payments shall not be applicable unless otherwise specifically decided by The Government.]

 

 

 

13.3        Monthly Payments: The Consultant shall submit an Invoice for Remuneration and Reimbursable at the end of every month and payments shall be made by the Client within fifteen (15) calendar days of receipt of the invoice.

13.4        Final Payment: The final payment shall be made only after the final report shall have been submitted by the Consultant and approved as satisfactory to the Client. If the Client notifies any deficiencies in the Services or the final report, the Consultant shall promptly make any necessary corrections, to the satisfaction of the Client.

13.5        Suspension: The Client may, by written notice of suspension to the Consultant, suspend all payments to the Consultant hereunder if the Consultant fails to perform his/her obligations under this Contract.

13.6        Refund of Excess Payment: Any amount if paid to the Consultant in excess of the amount actually payable under the provisions of the Contract shall be reimbursed by the Consultant within thirty (30) days of receipt of the claim from the Client, provided that such claim is lodged within three(3) months after the acceptance of the final report.

 

Obligations of the Consultant

14.       Medical Arrangements

14.1        The Consultant shall, before commencement of the Services furnish the Client with a medical report providing evidence satisfactory to the Client that the Consultant is in good health and is not subject to any physical or mental disability which may interfere with his/her performance of the Services.

15.       Working Hours and Leave

15.1        The Consultant shall, when engaged directly with the Client, follow the normal Working Hours and Holidays of the Client, and entitlement to leave as per the Client’s Rules.

 

15.2        The Consultant’s remuneration shall be deemed to cover  leave except otherwise specified in the Contract.

16.       Performance Standard

16.1        The Consultant undertakes to perform the Services with the highest standards of professional and ethical competence and integrity.

17.       Contract Administration

17.1        Client’s Representative

The Client’s representative, as indicated in Annex A, shall be responsible for the coordination of all activities under the Contract.

17.2      Timesheets

The Consultant providing Services may be required to complete standard timesheets or any other document to identify the time spent, as requested by the Client’s Representative.

18.       Confidentiality

18.1        The Consultant shall not, during the term of the Contract or within two years after its expiration, disclose any proprietary or confidential information relating to the Services, the Contract or the Client’s business operations without the prior written consent of the Client.

19.       Consultant’s Liabilities

19.1        The Consultant shall continue to cooperate with the Client after the termination of the Contract, to such reasonable extent as may be necessary to clarify or explain any reports or recommendations made by the Consultant.

 

19.2        The Consultant shall report immediately to the Client any circumstances or events which might reasonably be expected to hinder or prejudice the performance of the Services.

20.       Consultant not to be Engaged in Certain Activities

20.1        The Consultant agrees that, during the term of the Contract and after its termination, the Consultant shall be disqualified from providing goods, works or services (other than any continuation of the Services under the Contract) for any project resulting from or closely related to the Services.

 

Obligations of the Client

21.       Services, Facilities and Property

21.1       The Client shall, free of any charge to the Consultant, make available for the purpose of carrying out the assignment data, local services, personnel, and facilities indicated in Annex A.

 

 

 Termination and Settlement of Disputes

 

 

22.       Termination

22.1        By the Client

The Client may terminate the Contract by not less than twenty-eight (28) days written notice to the Consultant, Such notice to be given after the occurrence of any event necessitating such termination.

22.2        By the Consultant

          The Consultant may terminate the Contract, by not less than twenty eight (28) days written notice to the Client, if the Client fails to pay any monies due to the Consultant pursuant to the Contract.

23.       Dispute Resolution

23.1        Amicable Settlement

The Client and the Consultant shall use their best efforts to settle amicably all disputes arising out of or in connection with this Contract or its interpretation.

 

 

23.2        Arbitration

If the dispute cannot be settled the same may be settled through arbitration in accordance with the Arbitration Act 2001 of Bangladesh as at present in force. The place of Arbitration shall be in Dhaka.

 

IN WITNESS WHEREOF the parties hereto have signed this agreement the day and year first above written.

 

FOR THE CLIENT

FOR THE CONSULTANT

Signature

Signature

Print Name & Position:

Print Name:

           

                                                                 

The following documents forming the integral part of this contract shall be interpreted in the following order of priority:

 

(a) The Form of contract

 

      Annex A: Description of Services

 

      Annex B:  Cost Estimates of Services and Schedule of Rates

    

      Annex C: Consultant’s Reporting Obligations

                                                                 

ANNEX A: Description of the Services

 

 

[Give detailed descriptions of the Services including its (a) Background, (b) Objectives, (c) Detailed negotiated TOR providing a description of Services to be provided , (d) Work plan with dates for completion of various tasks, (e) Place of performance of different tasks, (f) Specific tasks to be approved by the Client; etc.).

 

[also ensure the following data is listed in this Annex in conformity with the Contract Agreement.

 

1.      The name of the main location (Duty Station) at which the Services are to be provided. Also advise if any other travel will be necessary, and if so, to which expected locations will the Consultant be required to travel.

 

2.      Indicate the Contact Addresses for Notices and Requests as indicated in Clause 22.1 of the Contract Agreement.

 

(a) Address of the Client:

            (With phone number, Fax number & e-mail)

 

 (b) Address of the Client:

             (With phone number, Fax number & e-mail)

 

 

Note : As mentioned in RFA and EOI. Negotiated shall be provided in Contract Agreement)

 

 

3.      Logistics  and facilities to be provided to the Consultant by the Client are listed below:

·             Office space with furniture including file cabinet and  electric connection;

·             Office Assistant(s)/Support staff;

·             Office equipment like computer, printer etc;

·             Facilities for production and binding of reports etc. shall be the responsibility of the Client in case of Time based contract.

·             Any other facilities agreed by both Client & the Consultant.

 

 



ANNEX B
: Cost estimates of Services and Schedule of Rates

 

(A)       Remuneration

 

Name of Consultant

 

Rate, Taka

Quantity

Total

Taka

(a)

(b)

(c)

(d) = (b) x (c)

 

 

 

 

Remuneration is made on a [state monthly, daily or hourly] rate

 

Sub-Total (A)

 

(B)       Reimbursable

 

Items of reimbursable

Unit

Qty

Rate(Taka)

Total

(Taka)

(a)

(b)

(c)

(d)

(e) = (c) x (d)

(a) Per Diem Allowance

 

 

 

 

(b) Air Travel Costs

 

 

 

 

(c) Other Travel cost

 

 

 

 

(d) Communication charges

 

 

 

 

(e) Reproduction of reports

 

 

 

 

(f) Other Expenses (to be listed)

 

 

 

 

 

 

 

 

 

Supporting documents and vouchers must be attached with the invoice

 

Sub-total (B) =

 

CONTRACT CEILING (A) +(B)=

Total =

 

 


ANNEX C: Consultant’s Reporting Obligations

(Sample Format)

 

 

Sl.

No.

Reports

Contents of

Reports

Persons to

Receive them

Date of

Submission

1

Inception Report

 

 

 

2

 

Interim Progress Report

(a)                First Status Report

(b)               Second Status Report

 

 

 

3

Draft Report

 

 

 

4

Final Report