Government of the People's Republic of Bangladesh
Local
Government Engineering Department (LGED)
Haor
Infrastructure and Livelihood Improvement Project (HILIP)
Project
Management Unit, LGED-RDEC Bhaban (Level-3)
Agargaon, Sher-E-Bangla Nagar,Dhaka -1207.
www.lged.gov.bd
Memo No.: LGED/PD/HILIP/M-02(Part-01)/2012/2105 Date: 10/01/2017
Request for Expression of
Interest (EOI)
For
Short-listing of a National Individual Consultant:
Infrastructure Management Specialist
The
Government of the People’s Republic of Bangladesh has received a credit for Haor
Infrastructure and Livelihood Improvement Project (HILIP)) from the International Fund for Agricultural Development (IFAD) and the Spanish Food Security
Co-financing Facility Trust Fund (IFAD Loan No-I-847-BD, IFAD Grant
No-I-C-847-BD & Trust Loan No-E-3-BD) and intends to apply part of the proceeds
of this credit to cover eligible payments under the contract for the provision
of consultancy services for the project by the following National Individual
Consultant. In view of above, the Project intends to
engage the same consultant. The service, experience, resource and delivery
capacity expected for the position are outlined as follows:-
Package No. |
Position Name |
No of Post |
Qualification and Experience |
Key Responsibilities |
HILIP/16/SD3/09 |
Infrastructure
Management Specialist |
1 |
Ø
The applicant should
have minimum bachelor degree in
Civil
Engineering from any reputed
university.
Ø
The applicant
should have at
least
10 years of
professional experience
of which
at least 5 years
in civil infrastructure
development as consultant/ design engineer/
quality
control engineer/ supervision engineer.
Ø
S/he should
have experience in
quality control, structural
design, scheme preparation, BOQ
preparation, supervision of civil and
labour intensive works. Ø
The incumbent
must have computer
proficiency (MS Office,
Auto-Cad etc.) . |
The Infrastructure Management Specialist (IMS) shall carry
out the following tasks outlined
below: ·
Prepare, verify, ensure and recommend infrastructure
schemes
in project areas based
on ranking criteria outlined in
the project documentation/ project
design
phase/ implementation phase; ·
Review tender
documents
(technical parts, drawing, and bill of
quantities, etc.) for implementation of infrastructure schemes; ·
Monitor Upazila, District and Project
Management
Unit (PMU) in timely planning
and completion of civil
works
(such as
road construction and maintenance,
market construction and
maintenance, village
flood
protection
works,
culverts,
small bridges, and
village development)
by mitigating/
minimizing environmental impacts and ensuring participation
of women to
the
greatest
extent possible; ·
Monitor quality
control engineer
(QCE) in
planning and coordinating
project activities,
communicating
the best practices relating to
quality control, preparing
the
implementation and
training manuals to
improve
the implementing capacity, and
in preparing annual/
periodical
reports of the project activities/components; ·
Guide DMU/UPU/ PD
to conduct
survey for community
infrastructure development
need assessment, identify
corrective
measures
to improve
infrastructure provision, and assist
in preparing detailed project implementation
plan and annual work plan
and budgets (AWPB); ·
Monitor physical progress and financial progress of infrastructure schemes
which include schemes implemented by LCS; Identify serious delays and
bottleneck and propose and follow up on mitigation measure; Identity
non-performance and recommend adequate penalties in accordance with the
provision of the contract. ·
Identify serious delays and bottleneck and propose and follow up on mitigation
measure; Identity non-performance and recommend adequate penalties in
accordance with the provision of the contract. ·
Ensure
timely preparation and
submission
of the
progress report
in the
prescribed format for
Ministry,
ERD, GoB, IFAD, STF and other
agencies as and when required. In
addition, prepare and
submit monthly, quarterly, half-yearly
and yearly
progress
report,
completion report
and other relevant
reports as arising of the
project needs as and
when requried; Key
Responsibilities/Accountability ·
Infrastructure
Management Specialist is a middle level consultant positioned at PMU and
will
co-ordinate the overall infrastructural activities
of the concerned
project district
under the project.
S/he
will
ensure
total
quality
control of
works including the works done by the contractors
and LCS. S/he
will assist in preparing proper
document and
look
after
the maintenance of infrastructure
works for the
quality and
sustainability. |
The Project
Director now invites eligible applicants to indicate their interest in
providing the services. Interested applicants are invited to provide information
indicating that they are qualified and competent to perform the services with a
complete CV having one copy of recent passport size photograph and other details
as required as per the application forms of RFA document provided by the
undersigned.
Only one consultant will be selected in
accordance with the PPR-2008. It is expected that the services may be commenced
on March-2017 and continued till the end of project completion or June 2019
based on requirement. Interested applicants may obtain further information and collect the
request for application (RFA) documents by applying to the address mentioned
above during office hours up to 29/01/2017 at 5:00 PM.
Expressions of interest shall be
submitted by the applicants on or before 30/01/2017 at 2.00 PM in sealed envelope delivered to the
undersigned and be clearly marked
“Request for expression of
interest for short-listing of Infrastructure Management
Specialist”.
(Gopal Chandra Sarker)
Project Director
Phone: 02 8144578
Email: gopalpdhilip@gmail.com
CC:
1.
The Chief
Engineer, LGED, Dhaka.
2.
The Additional Chief Engineer (-----------------------), LGED, Dhaka.
3.
The Unit In- Charge, MIS Unit, LGED, Dhaka: He is requested to publish
the above notice in LGED website.
4.
The Editor, 1)The Daily Star, 2) Jai Jai din: He is requested to publish
the above notice in his widely circulated daily newspaper in inner page for 1
day only before 13/01/2017.
5. Office Copy.