LGED Tender Banner

Government of the People’s Republic of Bangladesh

Local Government Engineering Department

Greater Mymensingh Rural Infrastructure Development Project

LGED Bhaban, Level-07, Agargaon, Sher-e-Bangla Nagar

Dhaka-1207

Memo No. LGED/PD/GMRIDP/C-06/2016/231                                                                      Dated: 21.03.2016

                                                                                                                                                         

 

Request for Expression of Interest (EoI)

 

 

1.

Ministry/Division

Ministry of Local Government, Rural Development & Co-operatives/Local Government Division

2.

Agency

Local Government Engineering Department (LGED)

3.

Procuring Entity Name

Project Director, GMRIDP

4.

Procuring Entity Code

Not at present.                                                                   

5.

Procuring Entity District

Dhaka

6.

Expression of Interest (EoI) for selection of

Selection of Consulting firm(national) for Hydrological and Morphological Study and Environmental Impact Assessment (EIA) for Construction of 100.00m long RCC bridge on Achintapur UP H/Q - Bhalukapur bazar road over Jalburunga river under Gouripur Upazila, Dist.- Mymensingh (Quality & cost based selection system) 

7.

EoI Ref. No.

Memo No. LGED/PD/GMRIDP/C-06/2016/231

8.

Ref. Date

21.03.2016

KEY INFORMATION

 

9.

Procurement Sub-Method

Quality & cost based selection.

FUNDING INFORMATION

 

10.

Budget and Source of Funds

GOB

11.

Development Partners

Not Applicable

PARTICULAR INFORMATION

 

12.

Project Code

5-3731-5106

13.

Project Name

Greater Mymensingh Rural Infrastructure Development Project

14.

Place of EoI submission

Office of the Project director GMRIDP, LGED Bhaban, Level-07, Agargaon, Sher-e-Bangla Nagar, Dhaka-1207.

 

15.

EoI closing date & time

Date

Time

 

12/04/2016

03:00pm

INFORMATION FOR APPILICANT

 

16.

Brief Description of Assignment

Hydrological and Morphological Study and Environmental Impact Assessment (EIA) :  The main objective of the assignment is to investigate the detailed hydrological, hydraulic and morphological analysis of the river sites in determining suitable bridge locations for the proposed bridges, openings, and hydraulic design variables of the bridge piers, abutment/guide bunds and associated river training works(RTW).

To provide technical assistance to the executing agency by preparing Comprehensive Environmental Study report i.e. Environmental Impact Assessment (EIA) report and presentation at  Department of Environment(DoE) to get Environmental Clearance Certificate(ECC) which is required for execution of the project. The study should embody a detailed yield of comprehensive report on environmental aspects of the project. Specific objectives of the present assignment is the Preparation of Environmental Management and Monitoring Plan(EMMP) considering significant environmental impacts regarding physical environment, ecosystems, climate, water resources, geology, human health, particularly agriculture, fisheries, industry, aquatic ecology and socio-economic environment.

The assignment period would be about for 2(two) months and tentatively starting from July 2016.

 

17.

Required experience

The Consulting Firm shall have a general experience of at least 5(five) years and practical experience with proven assignment record in preparation of Hydrological and Morphological Study and Comprehensive Environmental Study report i.e. Environmental Impact Assessment (EIA) report of at least 3(three) nos of large bridges(bridge length is equal to 100m or more) over river at different locations of our country. The EoI shall be evaluated on the basis of following documents:

 

1)   Registration of the firm.

2)   Age of the firm (Year in relevant business).

3)   Availability of key personals (List of key personnel in permanent pay role)   

4)   Financial Statement supported by audit report for last 3(three) years including turn over.

5) Experience of the firm in similar task/assignments last 10 (ten) years (example of past experience of similar nature and for complexity including cost and duration of the assignment).

6)  Experience of the firm in other works last 10 (ten) years (example of past experience of similar nature of task including cost and duration of the assignment).

7)    Support services of the firm(office space, support staff, equipment)

18.

Other information                                         

a)    Consulting firm will be selected in accordance with the procedures set out in the PPR-2008.

b)     Detailed information may be collected from the undersigned office during office hour.

19.

Association with foreign firm

Not encourage able.

20.

Ref No

Phasing of Service

Location

Indicative start date

Indicative Completion date

 

-

Not applicable

Mymensingh District.

July/2016

August/2016

PROCURING  ENTITY DETAILS

                                

21.

Name of Official Inviting EoI

S.M Abdus Salam                                   

22.

Designation of Official Inviting EoI

Project Director

23.

Address of Official Inviting EoI

GMRIDP, LGED Bhaban, Level-07, Agargaon, Sher-e-Bangla Nagar, Dhaka-1207.

24.

Contact details of Official Inviting EoI

Telephone: +(88)-02 91166178, Email: pd.gmridp@lged.gov.bd

25.

The procuring entity reserves the right to accept or reject all EoI’s

 

                                                                       

 

 

 

 

 

 

(S.M Abdus Salam)

Project Director

Tel: 02-9116647 (Off)

E-mail: pd.gmridp@lged.gov.bd

 

 

C.C to :

1. Chief Engineer, Local Government Engineering Department, LGED Bhaban, Agargaon, Sher-e-Bangla Nagar, Dhaka-1207.

2. Additional Chief Engineer (Impl.), LGED Bhaban, Agargaon, Sher-e-Bangla Nagar, Dhaka-1207.

3. Superintending Engineer (Design), LGED Bhaban, Agargaon, Sher-e-Bangla Nagar, Dhaka-1207.

4. Superintending Engineer, Mymensingh Region, LGED, Mymensingh.

5. Assistant Engineer, GIS, LGED, Agargaon, Dhaka. He is requested to published the EoI in LGED Website on or before 27/03/2016.

6. The Advertisement Manager, The Daily Jugantor/The Daily Observer. He is requested to Published the EoI in Newspaper for one day on or before 27/03/2016.

7. Office Copy.