LGED Tender Banner

Government of the People’s Republic of Bangladesh

Local Government Engineering Department

Feasibility Study in terms of Hydrological and Morphological Study,

Economic Analysis, Environmental Impact Assessment Study (EIA) and,

Preparation of Bidding Documents including Topographical Survey & Structural Design for Construction of 6 (Six) nos.

Important Large Bridges in Rangpur Division Project.

LGED, H/Q (Level-11), Dhaka.

Memo No. LGED/PD/GRDP/T-04/2012/467                                                                                                             Dated:11/11/2012

Request for Expression of Interest (EOI)

 

 

1.

Ministry/Division

Local Government, Rural Development & Co-operatives / Local Government Division

2.

Agency

Local Government Engineering Department (LGED)

3.

Procuring Entity Name

Project Director, Feasibility Study in terms of Hydrological and Morphological Study, Economic Analysis, Environmental Impact Assessment Study (EIA) and Preparation of Bidding Documents including Topographical Survey & Structural Design for Construction of 6 (Six) nos. Important Large Bridges in Rangpur Division Project, LGED H/Q,(Level-11), Agargaon, Dhaka-1207. 

4.

Procuring Entity Code

Not used at present

5.

Procuring Entity District

Dhaka

6.

Expression of Interest for selection of

Consulting Firm (National)

7.

EOI Ref No

02/2011-12

8.

Date

11-11-2012

        KEY INFORMATION

9.

Procurement Sub-Method

Fixed Budget Selection (FBS)

        FUNDING INFORMATION

10.

Budget and Source of Funds

GoB

11.

Development Partners (if applicable)

Not Applicable

        PARTICULAR INFORMATION

12.

Project Code (if applicable)

Not used at present

13.

Project Name

“Feasibility Study in terms of Hydrological and Morphological Study, Economic Analysis, Environmental Impact Assessment Study (EIA) and Preparation of Bidding Documents including Topographical Survey & Structural Design for Construction of 6 (Six) nos. Important Large Bridges in Rangpur Division Project, LGED H/Q,(Level-11), Agargaon, Dhaka-1207.” 

14.

Place of EOI Submission

Project Director, Feasibility Study in terms of Hydrological and Morphological Study, Economic Analysis, Environmental Impact Assessment Study (EIA) and Preparation of Bidding Documents including Topographical Survey & Structural Design for Construction of 6 (Six) nos. Important Large Bridges in Rangpur Division Project, LGED H/Q,(Level-11), Agargaon, Dhaka-1207.

15.

EOI Closing Date & Time

Date

Time

 

 

09-12-2012

2.00 PM (Bangladesh Standard Time)

        INFORMATION FOR APPLICANT

16.

Brief Description of the Assignment

LGED now invites Expression of Interest (EOI) from a Experienced Consulting Firm(National) to conduct the Financial & Economic Analysis:

Survey

(a)     Detailed Traffic Survey.

(b)     Social Survey

Analysis

(a)     Benefit Cost Ratio (BCR)

(b)     Net Present Value (NPV)

(c)     Economic Internal Rate of Return( EIRR)

(d)     Financial Internal Rate of Return (FIRR)

(e)     Public views regarding the impact of proposed construction.

Method

(a)     Economic & Financial Analysis will be conducted using Vehicle Operating Cost Saving Approach

(b)     Public views regarding the impact of proposed construction through PRA.

 

 

 

17.

Required Experience

The Consulting Firm shall have a general experience of at least 5 (Five) years in performing at least 3 (Three) nos. of financial & economic analysis of rural development projects. The EOI shall be submitted along with the following documents.

(a)     Registration of the firm.

(b)     Background of the firm with brochures.

(c)     Summary of similar nature of works experience on the last 3 (Three) years with assignment name/start date/ completion date including financial year.

(d)     Organization information, manpower having relevant experience and professional qualification.

(e)     Availability of resources supported by audit report for the last 1 (one) year.

(f)      Logistic Services of the firm.

18.

Other Information

Consulting firm will be selected in accordance with the procedures set out in the Public Procurement Rules-2008 (PPR-2008). Interested consulting firms may obtain further information from the undersigned office during 09.00 am to 05.00 pm excepting Govt. Holiday.  

        EMPLOYER  DETAILS

19.

Name of Official Inviting EOI

Syed Shafiul Alam

20.

Designation of Official Inviting EOI

Project Director

21.

Address of Official Inviting EOI

Project Director, Feasibility Study in terms of Hydrological and Morphological Study, Economic Analysis, Environmental Impact Assessment Study (EIA) and Preparation of Bidding Documents including Topographical Survey & Structural Design for Construction of 6 (Six) nos. Important Large Bridges in Rangpur Division Project, LGED H/Q,(Level-11), Agargaon, Dhaka-1207.

22.

Contact details of Official Inviting EOI

Tel. No.  02-9142982

Fax No. 02-8124037

e-mail: shafiullged@gmail.com

23.

The Procuring Entity reserves the right to accept or reject any or all the EOI’s.

 

(Syed Shafiul Alam)

Project Director

Tel: 02-9142982 (Off)

Fax: 02-8124037 (Off)

E-mail: shafiullged@gmail.com

 
 

 


CC:

-  Chief Engineer, LGED, Dhaka.