Government of the People’s
of Republic of Bangladesh
Local Government Engineering Department
Office of the Executive Engineer
District: Nilphamari
www.lged.gov.bd
Memo No:
LGED/XEN/NIL/e-GP/2016-17/2161 Dated: 24-09-2016
e-Tender is invited
in the National e-GP System (http:/www.eprocure.gov.bd) for the procurement of
Sl. No. |
TID No. |
Name of Scheme |
1 |
66376 |
(a) Improvement of Dangapara
GPS Khalisha High School via Nayapara
Mosque road(Ch.00-1250m).(b). Construction of 01 no
(Size 0.625x0.600m) RCC Culvert at Ch. 450m on the same road.(Road ID-173854081).(Upazila-
Sayedpur,Dist.-Nilphamari. Package No: IRIDP-2/NIL/ DW-28 |
2 |
66377 |
(a) Improvement of Hazarihat
GC-NHW at Chikli Bazar via Changmari
Road. (Ch.500-3000m).(b). Construction of 06 nos (Size 0.625x0.600m) RCC Culvert at ch. 656m,1197m,1654m,1852m,2665m & 2979m on the same
road.(Road ID-173852010).Upazila-Sayedpur,Dist.-Nilphamari. . Package
No: IRIDP-2/NIL/ DW-56 |
3 |
66378 |
(a) Improvement of UZR Nayabari
Moydan-Kumargari via Derani
road at (Ch.1000-2220m)(b). Construction of 01
no(Size0.625x0.600m)RCC Culvert at ch.1105m on the same road.(Road
Id-173854056),Upazila-Sayedpur Package No: IRIDP-2/NIL/ DW-57 |
4 |
66379 |
Improvement of Hazarihat
GC Near Doksar dighi-Babrijhar
GC up to Upazila Border Road at (Ch.1710-2340m).(Road ID-173852008),Upazila-Sayedpur,Dist.-Nilphamari. Package
No: IRIDP-2/NIL/ DW-58 |
5 |
66380 |
(a)Improvement of Chowra
Bazar-Tinpai Hat road at (Ch.1070-1508m) &(Ch.1825-3040m) [438+1215=1653m]. (b) Construction of
01 no (Size:0.625x0.600m) RCC Culvert at Ch. 2435m
on the same road.(Road ID. 173854068), Upazila-Sayedpur,
Dist.-Nilphamari.. Package No: IRIDP-2/NIL/ DW-59 |
6 |
66381 |
(a) Improvement of Taragonj
Border at Doali para -Sarder para via Molan pukur road (Ch.00-2500m).(b). Construction of 04 nos
(Size 0.625x0.600m) RCC Culvert at Ch. 450m,750m,1600m&2410m on the same
road.(c)Construction of 01 no (Size 4.00x2.50m) RCC Box Culvert at Ch.688m on
the same road. (Road ID-173854006).(Upazila- Sayedpur,Dist.-Nilphamari.. Package
No: IRIDP-2/NIL/ DW-60 |
7 |
66382 |
(a) Improvement of UZR 1 near Shipaigonj hat - UZR 5 near Bottoli
GPS road.(Ch.00-1950m).(b). Construction of 05 nos (Size 0.625x0.600m) RCC Culvert at Ch. 184m,471m,819m,871m
& 969m on the same road.(Road ID-173855044).(Upazila-
Sayedpur,Dist.-Nilphamari. Package No: IRIDP-2/NIL/ DW-61 |
This is an
online Tender, where only e-Tender will be accepted in the National e-GP Portal
and no offline/hard copies will be accepted.
To submit
e-Tender, registration in the National e-GP system portal
(http:/www.eprocure.gov.bd) is required.
The fees
for downloading the e-Tender Documents from the National e-GP System Portal
have to be deposited on line through any registered banks branches up to 16/10/2016
to 17.00 P.M.
Further information
and guidelines are available in the National e-GP system portal and also from
E-mail: xen.nilphamari@lged.gov.bd
or Call to 0551-61485
Interested persons can communicate with the
undersigned during office hours.
(Md. Belal Hossain )
Executive Engineer
LGED, Nilphamari.
CC.
1.
The Chief
Engineer, Local Government
Engineering Department, LGED Bhaban, Agargaon, Shere Bangla Nagar,
Dhaka-1207.
2.
The Additional Chief Engineer (Implementation), LGED Bhaban,
Agargaon, Sher-e-Bangla
Nagar, Dhaka-1207
3.
Superintending
Engineer, (Region), LGED, Dinajpur.
4.
The Project Director, IRIDP-2, LGED Bhaban, Agargaon, Sher-e-Bangla Nagar, Dhaka-1207
5.
The Deputy
Commissioner, Nilphamari.
6.
The Superintendent of Pol1ice, Dist : Nilphamari.
7.
The
Executive Engineer, LGED, Dinajpur
8.
The Upazila Engineer, LGED, Upazila- Sayedpur, Dist:-
Nilphamari.
9.
The
Circulation Manager ______________________________
10. Office Copy