Government of the people’s
republic of Bangladesh Local government Engineering
Department Office of the Executive
Engineer District : Bhola. |
|
Memo No: 46.02.09.000.07.028.17.2787 Date : 10/12/2017
e –Tender Notice No. 28/2017-18
e – Tender is invited in the national e –GP System Portal (http://www.eprocure.gov.bd) for the
procurement of :
SL No. |
Upazila |
Package No |
T-ID No. |
Name of Scheme |
Last date of selling |
Last
date of receiving |
IRIDP-Bhola
Project |
||||||
01. |
Charfassion |
CHA/R-108 |
145592 |
Improvement of Road From Betua RHD Lounch
Ghat-Char Aicha GC Via Chairman Bazar Road at Ch-00-4000.0m Length-4000m Road
ID-509252007 |
03-01-2018 till 17:00 PM |
04-01-2018 till 12:00 AM |
02. |
Charfassion |
CHA/R-110 |
145593 |
Improvement of Road From RHD Road Salam
Patowary House- West way of Buragaurango River Via Shashibussion Gazaria GC
Road & West Awaspur 49 No. GPS Road at Ch-1000-7000.0m Length-3000m Road
ID-509254085Construction of Palisading Work on RHD Road Salam Patowary House-
West way of Buragaurango River Via Shashibussion Gazaria GC Road & West
Awaspur 49 No. GPS Road at Ch- 1546-1650m L/S 1594-1610m R/S 2227-2250m R/S
Length-143.00mConstruction of 0.75m x 0.75m 9 no RCC U Drain on RHD Road
Salam Patowary House- West way of Buragaurango River Via Shashibussion
Gazaria GC Road & West Awaspur 49 No. GPS at Ch-1026m 1063m 1603m 1670m
1900m 2100m 2540m 3013m & 3198m.Construction of 2 no 1.50m x 1.50m RCC
box Culvert on RHD Road Salam Patowary House- West way of Buragaurango River
Via Shashibussion Gazaria GC Road & West Awaspur 49 No. GPS at Ch-1305m
& 3650m. |
03-01-2018 till 17:00 PM |
04-01-2018 till 12:00 AM |
03. |
Charfassion |
CHA/R-111 |
145594 |
Improvement of Road From Charfassion Dularhat
Road-Surudip Khal Road Via Hazirhat Road at Ch-1800-3750.0m Length-1950m Road
ID-509254051Construction of Palisading Work on Charfassion Dularhat
Road-Surudip Khal Road Via Hazirhat Road at Ch- 1807-1823m R/S 1850-1865m R/S
1890-1917m L/S 1929-1948m R/S 1973-1990m L/S 2104-2113m R/S
Length-103.0mConstruction of 7 no 0.75m x 0.75m RCC box Culvert on
Charfassion Dularhat Road-Surudip Khal Road Via Hazirhat Road at Ch-1994m
2100m 2250m 2610m 3191m 3556m & 3570m.Construction of 3.0m x 3.0m RCC box
Culvert on Charfassion Dularhat Road-Surudip Khal Road Via Hazirhat Road at
Ch-2890m. |
27-12-2017 till 17:00 PM |
28-12-2017 till 12:00 AM |
04. |
Charfassion |
CHA/R-113 |
145595 |
Improvement of Road From Kasemgonj Jalil
Bapari Road 06 No Ward- West way of Mollah Bari Road at Ch-00-1200.0m
Length-1200m Road ID-509255092Construction of Palisading Work on Kasemgonj
Jalil Bapari Road 06 No Ward- West way of Mollah Bari Road at Ch- 5-42m R/S
46-76m R/S 78-112m B/S 112-141 R/S 412-427 R/S 438-451 R/S 473-495 R/S
618-630 R/S 696-717 R/S 803-853 R/S 914-939 R/S 943-955 R/S
Length-334.0mConstruction of 6 no 0.75m x 0.75m RCC U Drain on Kasemgonj
Jalil Bapari Road 06 No Ward- West way of Mollah Bari Road at Ch-242m 412m
473m 717m 824m & 1122m.Construction of 1.50m x 1.50m RCC box Culvert on
Kasemgonj Jalil Bapari Road 06 No Ward- West way of Mollah Bari Road at
Ch-100.0m. |
27-12-2017 till 17:00 PM |
28-12-2017 till 12:00 AM |
05. |
Charfassion |
CHA/R-114 |
145596 |
Improvement of Road From Mukharbandha Khal
Bridge-North way of Oli Mia Chowkider Bari Principal Nazrul Islam Road at
Ch-500-2000.0m Length-1500m Road ID-509255156Construction of Palisading Work
on Mukharbandha Khal Bridge-North way of Oli Mia Chowkider Bari Principal
Nazrul Islam Road at Ch-955-960 R/S 1295-1310 L/S 1356-1368 R/S 1477-1500 L/S
1487-1513 R/S 1667-1684 R/S Length-89.0mConstruction of 8 no 1.50m x 1.50m
RCC box Culvert on Mukharbandha Khal Bridge-North way of Oli Mia Chowkider
Bari Principal Nazrul Islam Road at Ch-950m 1044m 1152m 1237m 1331m 1629m 170m
& 1860m.Construction of 4 no 0.75m x 0.75m RCC box Culvert on
Mukharbandha Khal Bridge-North way of Oli Mia Chowkider Bari Principal Nazrul
Islam Road at Ch-636m 870m 1823m & 1984m. |
27-12-2017 till 17:00 PM |
28-12-2017 till 12:00 AM |
06. |
Charfassion |
CHA/R-115 |
145597 |
Improvement of Road From Kalmi bridge
bazzar-South Char Aicha bazar via Rasulpur UP Office Road at Ch-7300-9800.0m
Length-2500.0m Road ID-509253041Construction of Palisading Work on Kalmi
bridge bazzar-South Char Aicha bazar via Rasulpur UP Office Road at
Ch-8847-8868m L/S Length-21.0mConstruction of 2 no 1.50m x 1.50m RCC box
Culvert on Kalmi bridge bazzar-South Char Aicha bazar via Rasulpur UP Office
Road at Ch-7836m & 8500m.Construction of 3.00m x 3.00m RCC box Culvert on
Kalmi bridge bazzar-South Char Aicha bazar via Rasulpur UP Office Road at
Ch-9690.0m.Construction of 2.0m x 4.50m x 3.50m RCC box Culvert on Kalmi
bridge bazzar-South Char Aicha bazar via Rasulpur UP Office Road at
Ch-9785.0m. |
27-12-2017 till 17:00 PM |
28-12-2017 till 12:00 AM |
07. |
Charfassion |
CHA/R-116 |
145598 |
Improvement of Road From West Side of RHD
Road-Vhanchar Abason Project Via Moulobi Road at Ch-1200-2200.0m
Length-1000.0m Road ID-509255062Construction of 0.75m x 0.75m RCC box Culvert
on West Side of RHD Road-Vhanchar Abason Project Via Moulobi Road at
Ch-1900.0m.Construction of 3.00m x 3.00m RCC box Culvert on West Side of RHD
Road-Vhanchar Abason Project Via Moulobi Road at Ch-1377.0m.Construction of
2.0m x 4.50m x 3.50m RCC box Culvert on West Side of RHD Road-Vhanchar Abason
Project Via Moulobi Road at Ch-1770.0m. |
27-12-2017 till 17:00 PM |
28-12-2017 till 12:00 AM |
08. |
Charfassion |
CHA/R-109 |
145599 |
Improvement of Road From Betua RHD Lounch
Ghat-Char Aicha GC Via Chairman Bazar Road at Ch-4000-8000.0m Length-4000m
Road ID-509252007 |
03-01-2018 till 17:00 PM |
04-01-2018 till 12:00 AM |
09. |
Charfassion |
CHA/R-112 |
145600 |
Improvement of Road From Boktirhat Baburhat
Pucca Road Kasem Akhon Bridge-Sharek Khali Bridge Road. at Ch-00-1500.0m
Length-1500m Road ID-509254191Construction of 7 no 0.75m x 0.75m RCC Box
Culvert on Boktirhat Baburhat Pucca Road Kasem Akhon Bridge-Sharek Khali
Bridge Road at Ch- 165m 244m 500m 722m 810m 1021m & 1142.0m. |
27-12-2017 till 17:00 PM |
28-12-2017 till 12:00 AM |
Continue Page-02
Page-02
SL No. |
Upazila |
Package No |
T-ID No. |
Name of Scheme |
Last date of selling |
Last
date of receiving |
IRIDP-Bhola
Project |
||||||
10. |
Charfassion |
CHA/R-117 |
145601 |
Improvement of Road From Gazaria
Shashibussion Road Keramot Ali Moszid-East way of Kuchiamora Madrasha Road
Via College Road 02 No. Bridge Road at Ch-00-2075.0m Length-2075m Road
ID-509254190Construction of Palisading Work on Gazaria Shashibussion Road
Keramot Ali Moszid-East way of Kuchiamora Madrasha Road Via College Road 02
No. Bridge Road at Ch-811-835 R/S 825-834 L/S 2050-2070 R/S
Length-53.0m.Construction of 5 no 0.75m x 0.75m RCC U Drain on Gazaria
Shashibussion Road Keramot Ali Moszid-East way of Kuchiamora Madrasha Road
Via College Road 02 No. Bridge Road at Ch- 294m 1210m 1323m 1453m &
1982m. Construction of 3.00m x 3.00m RCC box Culvert on Gazaria Shashibussion
Road Keramot Ali Moszid-East way of Kuchiamora Madrasha Road Via College Road
02 No. Bridge Road at Ch- 824.00m. |
27-12-2017 till 17:00 PM |
28-12-2017 till 12:00 AM |
11. |
Charfassion |
CHA/R-118 |
145602 |
Improvement of Road From Vhuter
Khal-Mukharbanda Khal Near Farazi Bari Mazahar Ali Road at Ch-00-1125.0m
Length-1125m Road ID-509254029Construction of Palisading Work on Vhuter
Khal-Mukharbanda Khal Near Farazi Bari Mazahar Ali Road at Ch-233-271 L/S
978-993 L/S 1094-1101 R/S Length-60.0m.Construction of 7 no 0.75m x 0.75m RCC
U Drain on Vhuter Khal-Mukharbanda Khal Near Farazi Bari Mazahar Ali Road at
Ch- 58m 114m 235m 549m 755m 875m & 1058m. |
27-12-2017 till 17:00 PM |
28-12-2017 till 12:00 AM |
12. |
Charfassion |
CHA/R-119 |
145603 |
Improvement of Road From Golderhat-WDB Embk.
UZR Road at Ch-1000-2000.0m Length-1000m Road ID-509254182Construction of
Palisading Work on Golderhat-WDB Embk. UZR Road at Ch-1182-1196 R/S 1290-1321
L/S 1509-1521 R/S 1847-1867 R/S Length-77.0m.Construction of 0.75m x 0.75m
RCC U Drain on Golderhat-WDB Embk. UZR Road at Ch-1595.00mConstruction of
2.0m x 4.50m x 3.50m RCC box Culvert on Golderhat-WDB Embk. UZR Road at Ch-
1994.00m. |
27-12-2017 till 17:00 PM |
28-12-2017 till 12:00 AM |
13. |
Borhanuddin |
BOR/R-107 |
145604 |
Improvement of Gafurgong Bazar-Mollarhat
Mosonerhat road at Ch-00-875.0m Length-875m Road ID-509214075Construction of
Palisading Gafurgong Bazar-Mollarhat Mosonerhat road at Ch-433-458m R/S
541-548m R/S 556-576m R/S 595-600m R/S 631-635m L/S 784-795m R/S 813-833m R/S
863-870m L/S Length-99.0m.Construction of 0.625x0.625m RCC U Drain on
Gafurgong Bazar-Mollarhat Mosonerhat road at Ch-712.00m |
27-12-2017 till 17:00 PM |
28-12-2017 till 12:00 AM |
14. |
Lalmohan |
LAL/R-104 |
145605 |
Improvement of UNR 3013 to Azam Road via
Purba Kachuakhali GPS Awlad Hossain Road at Ch-00-590m Length-590.00m Road
ID-509544044Construction of 1 no 1.50mx1.50m RCC Box Culvert on Azam Road via
Purba Kachuakhali GPS Awlad Hossain Road at Ch-295.00m.Construction of 1 no
0.75x0.75m RCC Box Culvert on Azam Road via Purba Kachuakhali GPS Awlad
Hossain Road at Ch-22.00m. |
27-12-2017 till 17:00 PM |
28-12-2017 till 12:00 AM |
15. |
Lalmohan |
LAL/R-105 |
145606 |
Improvement of Paschim Char Umed Samsul Haque
road at Ch-00-1304m Length-1304.00m Road ID-509545105Construction of
Palisading Work on Paschim Char Umed Samsul Haque road at Ch-730-736m L/S
736-756m R/S 777-800m L/S 796-816m R/S 821-836m L/S 868-878m R/S 904-914m R/S
Length-104.0m.Construction of 2 no 1.50mx1.50m RCC Box Culvert on Char Umed Samsul
Haque road at Ch-32.0m & 980.0mConstruction of 2 no 0.75x0.75m RCC Box
Culvert on Char Umed Samsul Haque road at Ch-586.0m & 644.0m |
27-12-2017 till 17:00 PM |
28-12-2017 till 12:00 AM |
This
is an online Tender where only e – Tender will be accepted in the national e –
GP portal and on offline/ hard copies will be accepted to submit e – Tender
registration in the National- e – GP system portal (http://WWW.eprocure.gov.bd) is required.
The fees for down loading the
e – Tender documents from the national e – GP System portal have to be
deposited online through any registers banks branch up to 27/12/2017 till 17.00 PM & (Sl No. 01,
02, 08) 03/01/2018 till 17.00 PM. Further information and guidelines and available
in the national e – GP system portal and from e – GP help desk (helpdesk@eprocure.gov.bd)
(Md. Shakhawat Hossain)
Executive Engineer
LGED, Bhola.
Ph: No.0491-61378
E-mail: xen.bhola@lged.gov.bd
Memo No: 46.02.09.000.07.028.17. 2787/1(100) Date : 10/12/2017
Copy forwarded for
information & necessary action please:-
1. |
Chief Engineer, LGED, LGED Bhabon,
Agargaon Shar-E-Bangla Nagar,Dhaka-1207 |
2. |
The Additional Chief Engineer, LGED, Barisal
Division, Barisal. |
3. |
The Superintendent Engineer, LGED, Barisal Zone,
Barisal. |
4. |
The Project Director, (IRIDP-Bhola Project), LGED
Bhabon, Agargaon Shar-E-Bangla Nagar,Dhaka-1207 |
5. |
The Deputy Commissioner, Bhola. |
6. |
The Superintendent of Police, Bhola |
7. |
The Executive Engineer RHD/PWD/WDB/DPHE, Bhola. |
8. |
The Upazila Engineer, Bhola(s)/ Borhanuddin/
Daulatkhan/ Lalmohan/ Tozumuddin/ Charfassion & Monpura, Bhola |
9. |
The Editor, The Daily Jugantor,
12/7 North Kamolapur, Dhaka-1217.
Requested to published the Tender Notice. |
10. |
The Editor, The Daily Star, 44-46, Kazinazrul Islam
Avenue, Dhaka-1215. Requested to published the Tender Notice. |
11. |
Notice Board, of this office. |
(Md. Shakhawat Hossain)
Executive Engineer
LGED, Bhola.
Ph: No.0491-61378
E-mail: xen.bhola@lged.gov.bd