Government of the People’s Republic of Bangladesh
Local
Government Engineering Department
Office of the Executive Engineer
District: Pabna.
Invitation
for Tender (Works)
Tender Notice No: 30/2009-10
Sealed tenders
are hereby invited from the eligible tenderers as defined in the tender
documents for the under mentioned works as per terms and conditions stated
below:
Package No.
|
Name of Works
|
Estimated Cost (Tk)
|
Tender security (Tk.)
|
Time for completion
(days)
|
Price of tender
documents (Tk.)
|
|
Name of Project:
IRBNWRC
|
|
|
|
|
Pab/IRBNWRC/09-10/W-213
|
Improvement of Raipur GC at Maifa High School –
Dulai Bodonpur NHW via Bonkola Gajaria Gorervita to Laldangi road at
Ch.4100-5100m (Sujanagar).
|
37,67,234.00
|
76000.00
|
270 days
|
1000.00
|
Pab/IRBNWRC/09-10/W-214
|
Improvement of Viana UP office – Josnar More
Mathurapur Bottala Modhupur school road at Ch. 3500-5500m (Sujanagar).
|
74,66,085.00
|
150000.00
|
270 days
|
2000.00
|
Pab/IRBNWRC/09-10/W-215
|
Improvement of Krishnapur new Mosque – Bortur
bill road at Ch. 00-1500m (Sujanagar).
|
56,18,891.00
|
115000.00
|
270 days
|
2000.00
|
Pab/IRBNWRC/09-10/W-216
|
Improvement of Aladipur – Gazznar bil via
Samsul’s house road Ch.00-1000m (Sujanagar).
|
38,70,188.00
|
78000.00
|
270 days
|
1000.00
|
Pab/IRBNWRC
/09-10/W-217
|
Improvement of Hatkhali Shahi road – Kamalpur
Mondir to Khalilpur bazar road at Ch. 00 – 1200m (Sujanagar)
|
44,45,088.00
|
90000.00
|
270 days
|
1000.00
|
Pab/IRBNWRC
/09-10/W-218
|
Improvement of Kuripara badh – Shahpur road at
Ch. 00 – 1000m (Sujanagar)
|
36,43,333.00
|
75000.00
|
270 days
|
1000.00
|
Pab/IRBNWRC
/09-10/W-219
|
Improvement of Ulat –
Binadangi road at Ch. 00 – 1500m (Sujanagar)
|
56,70,598.00
|
115000.00
|
270 days
|
2000.00
|
Pab/IRBNWRC
/09-10/W-220
|
Improv. of Syedpur
Madrasa – Tofazzal shop –Yakub Ali’s
home road at Ch. 00 – 1500m (Sujanagar)
|
57,27,107.00
|
115000.00
|
270 days
|
2000.00
|
Pab/IRBNWRC
/09-10/W-221
|
Improv. of Poradanga
bazar Kazipur road – Udaypur Pr. School road Ch. 400 – 1300m (Sujanagar)
|
39,70,729.00
|
80000.00
|
270 days
|
1000.00
|
Pab/IRBNWRC
/09-10/W-222
|
Improvement of
Hudarpara Azim Sarder’s home - Mosque road Ch. 00 – 1000m (Sujanagar)
|
39,02,487.00
|
80000.00
|
270 days
|
1000.00
|
Pab/IRBNWRC
/09-10/W-223
|
Improv. of Kodim
Malanchi Hasai Sarder House – High Scholl via Taltala road Ch. 00 – 1000m
(Sujanagar)
|
38,09,987.00
|
77000.00
|
270 days
|
1000.00
|
Pab/IRBNWRC
/09-10/W-224
|
Improv. of Tarabaria
Mosque – Fakitpur via Satbaria UP office road at Ch. 00 – 1500m (Sujanagar)
|
58,09,006.00
|
117000.00
|
270 days
|
2000.00
|
Pab/IRBNWRC
/09-10/W-225
|
Improvement of Goruri
– Akdanta GC road at Ch. 1000 – 3440m (Atghoria)
|
115,57,456.00
|
235000.00
|
270 days
|
3000.00
|
Pab/IRBNWRC
/09-10/W-226
|
Construction of
1.5mx1.50m box culavert at Ch. 1775m on Ekdanta GC- Ataikula GC road
(Atghoria)
|
3,22,547.00
|
6500.00
|
120 days
|
300.00
|
Pab/IRBNWRC
/09-10/W-227
|
Construction of
2.00mx2.00m box culavert at Ch. 785m on Ekdanta Bazar- Shibpur bazar road
(Atghoria)
|
5,26,592.00
|
11000.00
|
120 days
|
500.00
|
Package No.
|
Name of Works
|
Estimated Cost (Tk)
|
Tender security (Tk.)
|
Time for completion
(days)
|
Price of tender
documents (Tk.)
|
|
|
|
|
|
|
Pab/IRBNWRC
/09-10/W-228
|
Construction of
1.50mx1.50m box culavert at Ch. 1535m on Ekdanta Bazar- Shibpur bazar road
(Atghoria)
|
2,56,743.00
|
6000.00
|
120 days
|
300.00
|
Pab/IRBNWRC
/09-10/W-229
|
Improvement of
Kasinathpur Cold Storage – Tangbari GPS via Tangbari road (Tangbari Pr. –
Malek Molla’s house road) Ch. 00 –638m Ch. 1060 – 1390m Link road Ch: 196-
1100m (Bera)
|
73,00,527.00
|
150000.00
|
270 days
|
2000.00
|
Pab/IRBNWRC
/09-10/W-230
|
Construction of
4.30mx3.00m RCC box culvert on Khanmorich UP – Chandipur hat road at Ch.
4800m (Bhangura)
|
8,48,854.00
|
17000.00
|
120 days
|
500.00
|
Pab/IRBNWRC
/09-10/W-231
|
Construction of
4.00mx4.00m RCC Three-Vent box culvert on Bhangura – Noagoan GCM road at Ch.
12950m (Bhangura)
|
17,92,027.00
|
36000.00
|
120 days
|
750.00
|
Pab/IRBNWRC
/09-10/W-232
|
Construction of
2.30mx2.30m RCC box culvert on Bhangura – Noagoan GCM at Ch. 13450-15416m
(Bhangura)
|
8,49,200.00
|
17000.00
|
120 days
|
500.00
|
Pab/IRBNWRC
/09-10/W-233
|
Construction of
2.30mx1.60mx8.00m RCC box culvert on Sharatnagar GCM – Bonwarinagar GCM road
at Ch. 3500m 3900m & 4900m (Bhangura)
|
8,44,368.00
|
17000.00
|
120 days
|
500.00
|
Pab/IRBNWRC
/09-10/W-234
|
Construction of
2.30mx2.30m RCC box culvert on Jagatala Bhangura near South Para road at Ch.
2430m (Bhangura)
|
4,24,600.00
|
10000.00
|
120 days
|
300.00
|
Pab/IRBNWRC
/09-10/W-235
|
Construction of
4.30mx3.00m RCC box culvert on Upazila H/Q Kaydanga Ferry Ghat via Char
Bhangura East Para road at Ch. 2900m (Bhangura)
|
4,48,854.00
|
10000.00
|
120 days
|
300.00
|
1.
|
Source of Funds
|
:
|
GOB.
|
2.
|
Date, time and place of pre-tender meeting
|
:
|
Date: 11.05.10 Time : 12.00am and place office
of the undersigned
|
3.
|
Last date, time and places of selling tender
documents
|
:
|
Date: 19.05.10, Time: 5.00pm and Places:
i)
Project Director, IRBNWRC, LGED, LGED Bhaban,
Dhaka.
ii)
The Deputy Commissioner, Pabna.
iii)
The Superintendent of Police, Pabna.
iv)
Executive Engineer, LGED, Natore.
v)
Office of the undersigned(Principal)
vi) The
Upazila Engineer, Sadar/Sujanagar/Atghoria/Bera/Bhangura, Dist: Pabna
|
4.
|
|
:
|
Date: 20.05.10, Time: 12.00noon and Places:
i)
The Deputy Commissioner, Pabna
ii)
The Superintendent of Police, Pabna.
iii)
Office of the undersigned.
iv)
The Upazila Engineer,
Sadar/Sujanagar/Atghoria/Bera/Bhangura,
Dist: Pabna
|
5.
|
Date, time and place of opening of tender
|
:
|
Date: 20.05.10, Time: 3.00pm and Place:
Office of the undersigned
|
6.
|
Tender shall be valid for a
period of 120 days after tender
opening and must be accompanied by the tender security specified above.
Interested tenderer may obtain further information from the office of the
undersigned and purchase the tender documents in cash/treasury chalan/bank
draft from the places mentioned above. The tenderer or their authorized
representatives are allowed to attend the opening of tenders. If The Quoted Tender
Price Varies (Above/Less) More Than 5% (Five Percent) From The Official
Estimated Cost The Tender Shall Be Rejected. The
authority reserves the right to accept or reject any or all the tenders
without assigning any reasons whatsoever. This invitation
for tender is available on the LGED website www.lged.gov.bd
|
(Md.
Ghulam Kibria)
Executive Engineer
|
CC to:
1.
The Director General, CPTU, IMED, Block-12, 2nd
Floor, Sher-e-Banglanagar, Dhaka-1207.
2.
The Superintending Engineer, LGED, Rajshahi Region,
District: Rajshahi.
3.
The Deputy Commissioner, District: Pabna.
4.
The Project Director, IRBNWRC, LGED Bhaban, Agargaon, Sher-e-Bangla Nagar,
Dhaka-1207,
5.
The Superintendent of Police, District: Pabna.
6.
The Executive Engineer, PWD/RHD/BWDB/PHE, Pabna.
7.
The Executive Engineer, LGED, Natore.
8.
The Upazila Engineer, LGED, Sadar/Ishwardi/Atghoria/Chatmohar/Faridpur/Bhangura/Santhia/Bera/Sujanagar,
District:
Pabna.
9.
Notice Board (All).
10.
Editor, The Bangladesh Today/ˆ`wbK RbKÚ, Dhaka.
Sd/-
(Md. Ghulam Kibria)
Executive Engineer
|
|