LGED Tender Banner

Government of the Peoples Republic of Bangladesh

Local Government Engineering Department

Office of the Executive Engineer

District: Patuakhali.

Memo.No.LGED/XEN/Patua/2011/B-01/10-12/975                                                             Date : 18/03/2012

Invitation for Tender (Works)

Tender Notice Number: 26/2011-2012

Sealed tenders are hereby invited from the eligible tenderers as defined in the tender documents for the under mentioned works as per terms and conditions stated below:

Sl No

Package No.

Name of Works

Tender security (Tk.)

Time for completion (days)

Price of tender documents (Tk.)

1

RAILA/PTK/W-01

Rehab. of road from Patuakhali Khalishakhali Ferry Bazer-(Pukurjana bazar) Itbaria UP at ch.00-3000m, ID No.578953011 (Sadar)

78,000/=

120 days

1000/=

2

RAILA/PTK/W-02

Rehab. of road from Patuakhali H/Q-Muradia GC via Sreerampur Bazar (Sadar part), at ch.3700-6100m, ID No.578952009 (Sadar)

2,88,000/=

150 days

3000/=

3

RAILA/PTK/W-05

Rehab. of road from Nazirpur UP-Dhandi GPS-Chandapara Bazar road, at ch.1500-1850m, ID No.578383039 Const. of Mathborehat-Kalisuri-Kachipara-Gopalia Bazar (Jamal Munshi Bari) road: 3x3m RCC box culvert at ch.800m ID No.578384120 (Bauphal)

68,000/=

120 days

1000/=

3

RAILA/PTK/W-06

Rehab. of road from Kachipara UP-Joybangla Bazar-Karkhana Bazar-Paier hat-Dariabad UZR, at ch.0.0-4038m, ID No.578383037 (Bauphal)

1,34,000/=

120 days

2000/=

4

RAILA/PTK/W-04

Bauphal UP (Sher-E-Bangla road)-Naomala BDC road, at ch.0.0-4700m, ID No.578383021 (Bauphal)

1,49,000/=

120 days

2000/=

5

RAILA/PTK/W-15

Rehab. of  road from Nazirpur UP-Upazila H/Q-Daspara UP-Moisadi Bazar road, at ch.1500-3055m, ID No.578383013 (Bauphal)

2,27,000/=

150 days

2000/=

6

RAILA/PTK/W-09

Rehab. of  road from Lalua UP-Chinguria-Teakhali UP, at ch.0.0-1000m & RCC box culvert on 1.50mX1.50m at ch.190m, ID No.578663009 (Kalapara)

1,46,000/=

120 days

2000/=

7

RAILA/PTK/W-10

Rehab. of  road from Solimpur Bazar-West Sonatola Nilgonj UP, at ch.0.0-960m,  ID No.578663008 (Kalapara)

70,000/=

120 days

1000/=

8

IRIDP/PTU/ W-41

Improvement of Charmontaj Sluice Bazar-Char Basten Bazar road at ch.0.0m-2500.0m (Galachipa).

2,66,000/=

150 days

3000/=

9

IRIDP/PTU/ W-55

Improvement of Charmontaj Sluice Bazar-Char Basten Bazar road at ch.2500.0m-5000m (Galachipa).

2,66,000/=

180 days

3000/=

10

IRIDP/PTU/ W-56

Improvement of  Galachipa (Kalikapur)-Panpatty Launch ghat road from ch.4000m-6000m (Galachipa).

2,34,000/=

150 days

2000/=

11

IRIDP/PTU/ W-57

Improvement of Galachipa (Kalikapur)- Panpatty Launch ghat road from ch.6000m-8500m (Galachipa).

2,86,000/=

150 days

3000/=

12

IRIDP/PTU/ W-42

Improvement of road from Madrasha connecting road from Kachipara UP-Joy Bangla Bazar-Karkhana Bazar-Parerhat-Dariabad UZR (Kachipara Danida Bazar-Dariabad-Parerhat RNGPS-Karkhana Launch ghat) road by BC at ch.4550.0m-5400.0m (Bauphal)

92,000/=

120 days

1000/=

13

IRIDP/PTU/ W-43

A)Improvement of road from School connecting road from Kalisuri UP-Dhulia UP BC road Chandkhati J.N. Madrasha & RNGPS  ch.0.0m-295.70m (B) Imp. of school connecting road from Bauphal UP-Bilbilas Bazar-Madha Modanpura bazar-Kashabpur bazar-Mominpur GC-Kashabpur High school by BC at ch.0.0m-120.0m (C)Imp. of Madrasha connecting road from Mominpur GC-Kalisuri GC-Baherchar GC-Fazlul Haque Dhakhil Madrasha by BC at ch.0.0m-130.0m (D)Imp. of College connecting road from Bauphal Upazila H/Q Kalisuri GC to Nurainpur Colletge road by BY HBB at ch.0.0m-120.0m (Bauphal)

54,000/=

150 days

750/=

14

IRIDP/PTU/ W-44

Improvement of School connecting road from Boga GC (Shaplakhali R&H)-Kanakdia hat-Surjamoni-Kalisuri GC road-Pashim Indrokul GPS by BC at ch.0.0m-810.0m (Bauphal)

78,000/=

120 days

1000/=

15

IRIDP/PTU/ W-45

Improvement of School connecting road from Madanpura UP-Kanakdia bazar-Kachipara UP road-Joybangla Zakerabad Dakhan Madrasha  by BC at ch.0.0m-180.0m (B)Imp. of school connecting road from Danida BC road-Dakhin Boga Adarsho RNGPS by HBB at ch.0.0m-40.0m (C)Imp. of school connecting road from Boga Danida BC road-Daurabhanga GPS by BC at ch.0.0m-130.om under Boga Union (D)Imp. of school connecting road from Bauphal-Kalisuri BC road-Purbo Madonpura GPS by BC at ch.0.0m-400.0m under Madonpura Union (E)Const. of 1.60mX1.60m RCC Box culvert on the road from Bauphal-Kalisuri BC road-Purbo Madonpura GPS at ch.244m under Madonpura Union (Bauphal)

74,000/=

120 daus

1000/=

16

IRIDP/PTU/ W-46

Improvement of School connecting road from Mominpur GC-Kalaiya GC road-Kachua Dalima GPS  by BC at ch.0.0m-1036.0m under Nazirpur Union (Bauphal)

89,000/=

150 days

1000/=

17

IRIDP/PTU/ W-47

(A)Improvement of School connecting road from Purbo Kalaiya Sattar Master Bari road-Hasan Siddique High school by BC at ch.0.0m-730m (B)Const. of 01 No U-Drain culvert on at ch.550m on the same road (Bauphal)

66,000/=

120 days

1000/=

18

IRIDP/PTU/ W-48

(A)Improvement of School connecting road from Dakhin Dipasha RHD-Dakhin Dipasha GPS by BC at ch.0.0m-140m under Modonpura Union (B)Imp.of school connecting road from Madanpura UP-Kachipara UP BC road-Sonamaddin H/school by BC at ch.0.0m-200.0m (C)Const.of 1No 0.375mX0.450m U-Drain at ch.160m on the same road under Madanpura Union(D)Imp.of school connecting road from Uttar Kalaiya BC road-Uttar Kalaiya GPS by BC at ch.0.0m-180.0m under Kalaiya Union (Bauphal)

47,000/=

120 days

750/=

19

IRIDP/PTU/ W-49

Improvement of Aynabas Kalaiya Comunity school- connecting road at ch.0.0m-700.0 m  (Bauphal)

61,000/=

120 days

750/=

20

IRIDP/PTU/ W-50

(A)Improvement of School connecting road from Boga-Kalaiya R&H road-Salam Pada House-Purbo Daspara Nesaria Dhakhil Madrasha by BC at ch.0.0m-950m (B) Const. 2Nos 0.625mX0.600m  U-Drain at ch.130m & 350m on the same road  (Bauphal)

88,000/=

150 days

1000/=

21

IRIDP/PTU/ W-51

(A)Improvement of School connecting road from Bauphal-Kalaiya RHD road-South side of Amena Khatun RNGPS by BC at ch.0.0m-275.0m under Daspara Union (B)Imp.of school connecting road from Bauphal UP (Sher-e-bangla road)-Nowmala VCD road-Jouta Dakhil Mohila Madrasha by BC at ch.0.0m-250m (C)Const.of 01No  0.625mX0.600m U-Drain at ch.4.0m on the same road under Bauphal Union(D)Imp.of school connecting road from Dasmina-Bauphal-Patuakhali RHD-Bauphal collage road by BC at ch.0.0m-180.0m under Bauphal Union  (Bauphal)

65,000/=

150 days

1000/=

22

IRIDP/PTU/ W-52

(A)Improvement of School connecting road from Mohasanuddin BC road-Mohasanuddin Sineor Fajil Madrasha BY BC at ch.0.0m-400.0m under Adabaria Union (B)Imp. of school conecting road from UZR-Nowmala High school by BC at ch.0.0m-260.0m under Nowmala Union (C)Imp.of school connecting road from UZR-Maddho Nowmala GPS by HBB at ch.0.0m-70.0m under Nowmala Union  (Bauphal)

62,000/=

120 days

750/=

23

IRIDP/PTU/ W-53

(A)Improvement of School connecting road from Golabari BC road-Sapleza RNGPS by BC at ch.0.0m-600.0m under Adabaria Union (B)Imp. of school connecting road from UZR-Batkajol Board GPS by HBB at ch.0.0m-70.0m under Nowmala union  (Bauphal)

53,000/=

120 days

750/=

24

IRIDP/PTU/ W-54

(A)Improvement of School connecting road from UZR-Holabunia Bazar-North side of Sitakundo bari RNGPS by BC at ch.0.0m-250m under Nowmala Union  (Bauphal)

22,000/=

90 days

500/=

25

UCRIP-18

A)Improvement of road from Kanakdia up  to Birpasha bazar via Nadu Howlader house via Chairman Abdul Raman house Shinherakati road by BC at ch.2500m-3400m (B)Imp. of same road by earth from ch.2500m-3400m (Bauphal)

1,12,000/=

120 days

1000/=

26

UCRIP-19

A)Improvement of road from kalaiya UP-Bogi hat (Aynabaj-Kalaiya-S Karpurkathi GPS) road by BC at ch.00m-900m (B)Imp. of same road by earth from ch.00m-900m (Bauphal)

1,12,000/=

120 days

1000/=

27

UCRIP-20

A)Improvement of road from kalaiya UP-Kalaiya Launch ghat Cable house road by BC at ch.3000m-3500m (B)Imp. of same road by earth from ch.3000m-3500m (Bauphal)

62,000/=

120 days

1000/=

28

UCRIP-21

A)Improvement of road from Kalishuri UP-Dhulia UP Jamalkathi Reg. Primary school & Chadkathi  road at ch.4000m-5000m (B)Imp. of same road by earth from ch.4000m-5000m (Bauphal)

1,24,000/=

150 days

1000/=

29

UCRIP-22

A)Improvement of road from Deuli Subidkhali UP Office-Goalkhali Bazar  road by HBB  at ch.1000m-2560m (B)Imp. of same road by earth from ch.1000m-2560m (C)Const. of  2Nos 625mX600m U-Drain at ch.1120m & 1490m on the same road  (Mirzagonj)

1,04,000/=

120 days

1000/=

 

1.

Method of Procurement.

:

Open Tendering Method (OTM).

2.

Source of Funds

:

RAARIP/ IRIDP/ UCRIP

3.

Date, time and place of pre-tender meeting

:

Date:  19 April  2012, Time: 11.00am and

Place: Office of the undersigned

4.

Last date, time and places of selling tender documents

 

:

Date:  29 April  2012, Time: 5.00pm and

a)The Project Director( RAARIP/IRIDP/UCRIP)(Concerned Project),LGED, LGED Bhaban, Agargoan, Sher-e-Bangla Nagar,  Dhaka-1207.

b)The Deputy Commissioner, Patuakhali.

c)The Superintendent of Police, Patuakhali.

d)The Executive Engineer, LGED, Patuakhali/Barisal.

e)The Upazila Engineer, LGED, Patuakhali Sadar/ Bauphal, Kalapara, Galachipa & Mirzagonj, Dist. Patuakhali (Concerned Group).

5.

Last date, time and places of receiving tender

:

Date: 30 April  2012, Time: 01:00 p.m and

a)The Deputy Commissioner, Patuakhali.

b)The Superintendent of Police, Patuakhali.

c)The Executive Engineer, LGED, Patuakhali/Barisal.

d)The Upazila Engineer, LGED, Patuakhali Sadar/Bauphal, Kalapara, Galachipa & Mirzagonj, Dist. Patuakhali.

6.

Date, time and place of opening of tender

:

Date: 30 April  2012, Time: 03.00pm and

Place: Office of the undersigned.

7.

Tender shall be valid for a period of 90 days days after tender opening and must be accompanied by the tender security specified above. Interested tenderers may obtain further information from the office of the undersigned and purchase the tender documents in cash/treasury chalan/ bank draft from the places mentioned above. The tenderer or their authorized representatives are allowed to attend the opening of tenders. The authority reserves the right to accept or reject any or all the tenders without assigning any reasons whatsoever.

 

 

(Sayeed Ahmed Baset)

Executive Engineer

LGED, Patuakhali.

Ph: 0441-62244

Email:xen.patuakhali@lged.gov.bd

Contd..P/3

 

 

 

 

 

 

Page No.3

CC.

 

1.The Chief Engineer, LGED, LGED Bhaban, Agargaon, Dhaka-1207.

2. The Superintending Engineer(Admin.), LGED, LGED Bhaban, Agargaon, Sher-E-Bangla Nagar, Dhaka-1207.

3. The Superintending Engineer, LGED, Barisal Region, District: Barisal.

4. The Project Director, (RAARIP/IRIDP/UCRIP), LGED, LGED Bhaban, Agargaon, Sher-E-Bangla Nagar, Dhaka-1207.

5. The Deputy Commissioner, District: Patuakhali.

6. The Superintendent of Police, District: Patuakhali.

7. The District Special Branch, Patuakhali.

8. The Executive Engineer, LGED, District: Barisal.

9. The Executive Engineer, RHD/BWDB/PWD, District:Patuakhali.

10. The Upazila Engineer, LGED, Upazila : Kalapara,Patuakhali Sadar,Bauphal, Galachipa & Mirzagonj, District:Patuakhali.

11. m¤úv`K, ˆ`wbK Lei, †ZRMvI wkí GjvKv, XvKv z (for wide circulation before 25 March/2012)

12.The Editor,The Daily New Nation, R.K.Mission road #1, Dhaka-1203 (for wide circulation before  25 March/2012)

13. Notice Board (All).