1
|
ChCC2-01
|
Improvement of Port Connecting Road from Alanker to Nimtola By BC. Ch. 1+450 to Ch.2+400km
|
CGP
|
mirsharai
|
|
2.85
|
|
|
4323.36
|
|
0.00
|
|
|
|
0
|
|
|
|
|
2
|
ChCC2-02
|
Improvement of port connecting road from Alaker to Nimtola (Ch-2`+400 to Ch-4+289) by Bituminous Carpeting.
|
CGP
|
mirsharai
|
|
5.67
|
|
|
5354.45
|
Rana Builders
|
5063.00
|
|
05/12/2017
|
13/05/2019
|
0
|
|
|
|
|
3
|
ChCC2-03
|
Improvement of port connecting road by BC from Alaker to Nimtola Ch-4+289 to Ch.6+371.
|
CGP
|
mirsharai
|
|
6.25
|
|
|
5391.48
|
Rana -Saleh Jv
|
5084.70
|
|
05/12/2017
|
13/05/2019
|
0
|
|
|
|
|
4
|
ChCC2-04
|
Improvement of Agrabad access road by overlay and widening with BC (Ch-0+00 to Ch-2+378)
|
CGP
|
mirsharai
|
|
7.13
|
|
|
5103.31
|
MBEL-ROYAL Jv BGMEA
|
4896.67
|
|
04/12/2017
|
13/05/2019
|
0
|
|
|
|
|
5
|
ChCC2-16
|
Contruction of 65m Bridge on Marinars Road
|
CGP
|
mirsharai
|
|
|
|
|
970.32
|
S Ananta & Abdus Salam JV
|
867.00
|
|
|
|
0
|
|
|
|
|
6
|
ChCC2-17
|
Reconstruction of road by RCC from Sotsong Asrom Nibash to Soroni Road (Ch-0+00 to Ch-1+503)
|
CGP
|
mirsharai
|
|
3.10
|
|
|
679.49
|
M/S Quashem Construction
|
639.01
|
|
05/07/2017
|
25/12/2018
|
0
|
|
|
|
|
7
|
ChCC2-08
|
New construction of Six Storied Building at Patanga Girls High School and Colledge Cum Cyclone Shelter.
|
CGP
|
mirsharai
|
|
1.00
|
|
|
2085.57
|
Dhaly Construction Ltd.
|
2064.72
|
|
02/09/2018
|
25/11/2019
|
0
|
|
|
|
|
8
|
ChCC2-9
|
New construction of Mohabbat Ali Girls High School Cum Cyclone Shelter.
|
CGP
|
mirsharai
|
|
1.00
|
|
|
736.34
|
M/S Quashem Construction
|
642.38
|
|
30/11/2017
|
23/02/2019
|
0
|
|
|
|
|
9
|
ChCC2-10
|
New construction of Ahmed Mia City Corp. Girls School Cum Cyclone Shelter
|
CGP
|
mirsharai
|
|
1.00
|
|
|
790.07
|
M/S Tohid & Brothers
|
685.36
|
|
19/05/2017
|
06/09/2018
|
0
|
|
|
|
|
10
|
ChCC2-11
|
Re- construction of Laldighi Community Centre Cum Cyclone Shelter.
|
CGP
|
mirsharai
|
|
1.00
|
|
|
1515.64
|
M/S Hasan & Brothers, Anantan BikashTripura Jv
|
1295.92
|
|
30/11/2017
|
23/02/2019
|
0
|
|
|
|
|
11
|
ChCC2-12
|
Re-construction of East Madarbari girls high school cum cyclone center
|
CGP
|
mirsharai
|
|
1.00
|
|
|
451.02
|
M/S Tohid & Brothers
|
371.09
|
|
02/05/2017
|
26/07/2018
|
0
|
|
|
|
|
12
|
ChCC2-13
|
Re-construction of West Madarbari girls high school cum cyclone center
|
CGP
|
mirsharai
|
|
1.00
|
|
|
616.12
|
M/S Quashem Construction
|
542.19
|
|
02/05/2017
|
26/07/2018
|
0
|
|
|
|
|
13
|
ChCC2-14
|
New construction of Patantully boys high school cum cyclone center.
|
CGP
|
mirsharai
|
|
1.00
|
|
|
632.85
|
M/S Monir Ahmed-Hossan & Brothers(JV)
|
529.75
|
|
17/08/2017
|
09/11/2018
|
0
|
|
|
|
|
14
|
ChCC2-15
|
New construction of Rabindra Nazrul high school cum cyclone center.
|
CGP
|
mirsharai
|
|
1.00
|
|
|
1094.39
|
Consonence Engineers and Builders & Abul Bashar (JV)
|
905.86
|
|
16/08/2017
|
09/11/2018
|
0
|
|
|
|
|
15
|
CIB-Chi-W-59
|
"Construction of 240 m long bridge over Halda river at Chainez 1500 m on Panchpukuria road under Fatikchhari upazila ,District: Chattogram (Road ID: 415334108)
CIB-Chi-W-59"
|
CIBRR
|
fatikchari
|
415334108
|
|
240.00
|
4
|
4784.75
|
Taher Brothers Ltd.
|
4660.15
|
14/01/2024
|
21/01/2024
|
20/07/2026
|
13
|
200.00
|
4
|
05/02/2025
|
|
16
|
CIB-Chi-W-99
|
Const. of 252 m long PSC Girder Bridge over Feni river on Shantir Hat GC to Dhaka-Chattogram Highway via Somitir Hat road at Ch.1300m under Misarai Upazila, District: Chattogram
|
CIBRR
|
mirsharai
|
415532017
|
|
252.00
|
69
|
2764.05
|
SE-HT (JV)
|
2893.97
|
14/07/2020
|
21/07/2020
|
04/06/2025
|
78
|
1991.89
|
69
|
05/02/2025
|
|
17
|
CIB-Chi-W-123
|
Const. of 72 m long RCC Girder Bridge over Dolu khal on Satkania-Damsha-Kanchona (Bokshirkhil) road at Ch. 2400m under Satkania Upazila, District: Charrogram
|
CIBRR
|
satkania
|
415824028
|
|
72.00
|
100
|
480.05
|
M/S Quashem Construction
|
408.12
|
27/09/2017
|
04/10/2017
|
28/03/2023
|
100
|
406.64
|
100
|
05/04/2025
|
|
18
|
CIB-Chi-W-122
|
Const. of 69m long RCC Girder Bridge over Dolu khal on Dolu Embankment cum (Isamoti Mahmudia Madrasa) connecting road at Ch.1650m under Satkania Upazila, District: Chattogram
|
CIBRR
|
satkania
|
234500
|
|
69.00
|
87
|
471.54
|
MS.Nipa Enterprise-QC (JV )
|
454.34
|
02/01/2019
|
09/01/2019
|
05/11/2022
|
100
|
395.98
|
87
|
05/02/2025
|
|
19
|
CRMIDP/CHT/W-436
|
Sarkar Hat Bazar
|
CRMIDP
|
anwara
|
|
|
|
30
|
272.00
|
M/S Dynamic Associate
|
233.70
|
15/11/2020
|
|
13/07/2022
|
40
|
70.80
|
30
|
28/07/2022
|
|
20
|
CRMIDP/CHT/W-439
|
Khan Hat
|
CRMIDP
|
chandanish
|
|
|
|
49
|
257.00
|
M/S Mustafa & Sons
|
212.30
|
19/04/2021
|
|
12/07/2022
|
73
|
103.22
|
49
|
28/07/2022
|
|
21
|
CRMIDP/CHT/W-441
|
Modon Hat
|
CRMIDP
|
hathazari
|
|
|
|
81
|
629.00
|
"M/S Quashem Constrection 52, Katalgonj, Panchlaish Chattogram. "
|
602.35
|
19/07/2022
|
|
02/08/2022
|
91
|
485.33
|
81
|
28/07/2022
|
|
22
|
CRMIDP/CHT/W-443
|
Komor Ail Bazar
|
CRMIDP
|
mirsharai
|
|
|
|
81
|
566.00
|
"Nahean Engineers and Builders-the New Trade Lind JV Porshuram, Feni "
|
536.90
|
25/07/2022
|
|
18/01/2022
|
87
|
434.58
|
81
|
28/07/2022
|
|
23
|
CRMIDP/CHT/W-445
|
Dhamir Hat
|
CRMIDP
|
rangunia
|
|
|
|
20
|
312.00
|
M/S Nipa Enterprise
|
300.00
|
07/07/2020
|
|
28/07/2022
|
35
|
60.31
|
20
|
28/07/2022
|
|
24
|
CRMIDP/CHT/W-446
|
Nowajeshpur Notun Hat
|
CRMIDP
|
raojan
|
|
|
0.00
|
51
|
634.00
|
Noor Syndicate & SM Trading
|
633.89
|
05/07/2022
|
|
02/08/2022
|
60
|
322.48
|
51
|
28/07/2022
|
|
25
|
CRMIDP/CHT/W-447
|
Moulovir Bazar
|
CRMIDP
|
sandwip
|
|
|
|
85
|
166.00
|
"M/S Rittika Traders – S.R Enterprise (JV) Sandwip, Chittagram "
|
185.86
|
27/07/2019
|
|
01/08/2022
|
98
|
158.28
|
85
|
28/07/2022
|
|
26
|
W-09(A)
|
A) Development of Baralia GPS-Kerinjaghat Road (Borolia Ukuinnara Road) by BC at ch. 0+900km-2+000km.B) Development of Naikhain Gairala Connecting Road (Naikhain Siraj Munsi Road) by RCC at ch. 0+000-0+830km.
|
DPURRIP
|
banskhali
|
415614029, 415615221
|
1.93
|
7.00
|
90
|
247.31
|
Shahgodi Traders & Kashem Enterprise (JV)
|
269.38
|
20/11/2019
|
|
08/06/2020
|
100
|
236.42
|
90
|
03/01/2021
|
|
27
|
W-09(B)
|
A) Development of Janglekhain UP-Baralia UP Road (Shagadi Road) by BC at ch. 1+000-1+835km.B) Development of Akber Sha Mazer (RHD)-Dharma Darshi Bodho Bihar Gate (RHD) (Pairul Chowdhury Bari Road) by RCC at ch. 0+830-2+060km.
|
DPURRIP
|
banskhali
|
415613002, 415614098
|
2.07
|
5.00
|
95
|
248.66
|
Shahgodi Traders & Kashem Enterprise (JV)
|
270.86
|
06/02/2020
|
|
08/06/2020
|
100
|
242.71
|
95
|
03/01/2021
|
|
28
|
W-09(C)
|
A) Development of Baralia Mohajanpara Bari Raod (Moulavirhat Nazrul Master Road) by BC at ch. 0+000-1+200km.B) Development of Melgar-Bangla Bazar Road (Melgar-Jagadananda Road) by RCC at ch. 0+000-1+500km.
|
DPURRIP
|
banskhali
|
415614019, 415615229
|
2.70
|
13.00
|
80
|
343.58
|
A ali chowdhurY-Ahnaf Associates(JV)
|
373.82
|
20/11/2019
|
|
27/08/2020
|
94
|
297.03
|
80
|
03/01/2021
|
|
29
|
W-01
|
Olirhat Road (Vair Dighi-Olirhat Road).Faruki para Road (Komol Munsirhat -Faruki para Road).
Sreemai Forest Office Road.
Ershadullah Fakir Road.
Muzaffarabad Datta Para Krisna Mondir Road.
Kharana Lalarkhil Road- Vaierdighir Road (Remaning part of Vaierdighir Road -Lalarkhil Road).
|
DPURRIP
|
patiya
|
415632001,415614054,415614053,415614055,415615407,415615240
|
5.93
|
14.50
|
|
494.76
|
Yakub & Brothers-Anma Traders (JV)
|
469.72
|
29/05/2018
|
|
05/12/2018
|
45
|
195.30
|
|
03/01/2021
|
|
30
|
W-02
|
Improvement of Kalishahar-Maitala-Ratanpur High School Road (Kelishahar UP to Dhalghat UP) by BC at ch. 0+000-2+500km.Improvement of Haidgaon Pan Bazar Road (UZR Kaji Para-RHD Mazerpara Nurul Hoque Dokan) by BC at ch. 0+000-1+170km.
|
DPURRIP
|
patiya
|
415614064, 415615101
|
3.67
|
11.50
|
75
|
34149518.00
|
MIB-MJE (JV)
|
35850825.18
|
29/09/2019
|
|
20/09/2020
|
82
|
229.22
|
75
|
03/01/2021
|
|
31
|
W-03
|
Asia Bhathua Jonokallan Road (Kashiaish- Noyahat-Bancharampur-Bhathua Road).Dhalghat Tazulmuluk ( Goserhat UZR Karankhain Raster Matha) Road by RCC.
Biplobi Surjo Shen Road to Chairman Sunil Chokkroborti Suresananda Asharayam Road) by BC.
Budhpura (Kasiaish UP Office) Vandergao-Bakkhain-Maliara bazar Connecting Road (Vandergao Bridge to-Bakkhain) Road by BC.
|
DPURRIP
|
patiya
|
415613008,415615056,415615417,415613022
|
6.16
|
18.00
|
80
|
701.04
|
Mans Traders-Hossen & Brothers-MA (JV)
|
687.74
|
12/09/2018
|
|
30/05/2020
|
91
|
558.16
|
80
|
03/01/2021
|
|
32
|
W-04
|
Kaliaish-Shovandandi-Khankhanabad Road Shovandhandi-Ashata- Bailtoli Connecting Road).Hilchia Lawarkhil Road (Kazirpukur par- Lauarkhil Road).
Chamudaria Bazar Road (Chamudaria bazar- Hilchia Hindupara Road).
Shovandandi Rashidabad Village Road (Kanto Kazi bari Road).
|
DPURRIP
|
patiya
|
415614026,415615058,415615073,415612011
|
6.43
|
13.50
|
90
|
616.58
|
MAC & ARM,
|
584.03
|
11/06/2018
|
|
30/05/2020
|
95
|
517.84
|
90
|
03/01/2021
|
|
33
|
W-05
|
A)Muralihat (RDH) Bainertek road (Ram Horidash Road) by RCC.
B)Sohid Abdul Barek Road by RCC.
|
DPURRIP
|
patiya
|
415614045,415615238
|
2.15
|
6.00
|
95
|
257.42
|
Mans Traders-Hossen & Brothers-MA (JV)
|
254.86
|
22/11/2018
|
|
30/11/2019
|
100
|
219.31
|
95
|
03/01/2021
|
|
34
|
W-06
|
A)Development of Monosartek (RHD)-Kantafakirhat GC via Kusumpura UP(Abbas sikder connecting Road)
B)Development of Kusumpura Internal Road
|
DPURRIP
|
patiya
|
415612011,415615115
|
5.35
|
21.00
|
55
|
598.23
|
Mans Traders-Hossen & Brothers-MA (JV)
|
592.03
|
18/11/2018
|
|
30/05/2020
|
71
|
316.74
|
55
|
03/01/2021
|
|
35
|
W-07
|
A)Santirhat Jiri Madrasha-Maliara-Mohira- Fakira Mosque Road (Nichsintapur- Mohira Primary School Road). by RCC
B)Improvement of jiri Saider Road.
C)Improvement of Mohammadnagar -Doulotia Road
D) Improvement of Jiri Lamar Bazar Road.
|
DPURRIP
|
patiya
|
415612014
|
3.86
|
10.50
|
0
|
492.97
|
M/S. J J Traders
|
515.01
|
28/07/2019
|
|
11/03/2020
|
100
|
467.90
|
0
|
03/01/2021
|
|
36
|
W-8
|
A)Developement of Shafar Ali Munsir Hat GC Lalar Hat GC Road
B)Developement of habilasdwip High School Road (Infront of Habikasdwip Janakalayan Clab)
C)Developement of TL Chowdhury Road
|
DPURRIP
|
patiya
|
415612017,415614051,415615079
|
3.77
|
21.00
|
55
|
501.35
|
A ali chowdhury-Khan enterprise (JV)
|
499.29
|
13/05/2019
|
|
31/05/2020
|
80
|
287.99
|
55
|
03/01/2021
|
|
37
|
W-10
|
A)Improvement of Khan Mohana Station (RHD)-Bhattcharjee hat GC Road
B)Improvement of Dengapara Hajee Ahamed Miah Road (RHD Dengapara-UZR Tekota Road)
|
DPURRIP
|
patiya
|
415612021,415615162
|
2.37
|
4.50
|
100
|
262.26
|
J & S JV
|
283.87
|
15/11/2018
|
|
04/09/2019
|
100
|
282.74
|
100
|
03/01/2021
|
|
38
|
WR-01(A)
|
Improvement of Olirhat Road(Vair Dighi-Olirhat Road) by BC Ch. 0+000 to 0+900km.
|
DPURRIP
|
patiya
|
415632001
|
0.90
|
1.50
|
|
43.47
|
M/S. Alam & Company
|
41.29
|
16/11/2020
|
|
23/05/2021
|
0
|
0.00
|
|
03/01/2021
|
|
39
|
W-01(B)
|
Improvement of Faruki Para Road (Komol Munsirhat-Faruki Para Road) by BC at Ch. 0+000 to 0+900km.
|
DPURRIP
|
patiya
|
415614054
|
0.90
|
|
|
79.09
|
M/S. Salma Enterprise
|
75.14
|
15/11/2020
|
|
22/05/2021
|
0
|
0.00
|
|
03/01/2021
|
|
40
|
W-01(C)
|
Improvement of Sreemai Forest Office Road by BC at Ch. 0+000 to 1+000km.
|
DPURRIP
|
patiya
|
415614053
|
1.00
|
3.00
|
|
97.30
|
M/S. S K Enterprise
|
92.43
|
02/11/2020
|
|
09/05/2021
|
5
|
0.00
|
|
03/01/2021
|
|
41
|
WR-01(D)
|
Improvement of Ershadullah Fakir Road by BC at Ch. 1+000 to 2+000km.
|
DPURRIP
|
patiya
|
415614055
|
1.00
|
|
|
89.33
|
M/S. H R Enterprise
|
84.87
|
01/11/2020
|
|
08/05/2021
|
0
|
0.00
|
|
03/01/2021
|
|
42
|
WR-01(E)
|
Improvement of Muzaffarabad Datta Para Krisna Mondir Road by BC at Ch. 0+000 to 0+630km.
|
DPURRIP
|
patiya
|
415615407
|
0.63
|
|
|
14.66
|
M/S. Jamal & Brothers
|
13.93
|
29/10/2020
|
|
05/05/2021
|
75
|
0.00
|
|
03/01/2021
|
|
43
|
WR-01(F)
|
Improvement of Kharana Lalarkhil Road-Vaier Dighi Road by BC at Ch. 0+700 to 2+200km.
|
DPURRIP
|
patiya
|
415615240
|
1.50
|
|
|
34.79
|
M/S. Ahmedia Traders
|
33.05
|
19/11/2020
|
|
26/05/2021
|
0
|
0.00
|
|
03/01/2021
|
|
44
|
GCHDP-WD-VZR–CHT-ANOW –MAIN-16/01
|
Hazigon Koton Mill Road (Bogon Shah (R.) Majar-Koton Mill). By dense Carpeting Ch. 00-1160
|
GCCP-2
|
anwara
|
|
|
|
|
0.00
|
M/S. S.K.B Enterprise
|
32.83
|
|
15/01/2017
|
22/05/2017
|
100
|
|
|
|
|
45
|
GCHDP-WD-VZR–CHT-ANOW–MAIN-18/03
|
Shilaigora R&H- Sayed Kuchaiya Barkal PAB Road (Borkal PAB Connecting Road) By Dense Carpeting at Ch. 00-550m.
|
GCCP-2
|
anwara
|
|
1.60
|
|
|
35.12
|
M/S. Hazrat Shah Safi Tayib Sha (R) & Brothers
|
43.40
|
|
|
|
0
|
|
|
|
|
46
|
GCHDP-WD-VZR–CHT-ANOW –MAIN-16/09
|
Chatary Circular Road By Dense Carpeting at Ch. 310–1617m.
|
GCCP-2
|
anwara
|
|
0.55
|
|
|
46.00
|
M/S. Kalilm Trading
|
33.10
|
|
10/01/2017
|
17/05/2017
|
100
|
|
|
|
|
47
|
GCHDP-WD-FRB–CHT-ANOW –MAIN-17/04
|
Khaikhain- Chamuduria Hazrat Sha Ali Reza Rd(Morali Ghat- Chamuduria, Barkal Connectimg ) Raod By Dense Carpeting at Ch. 2200-3000m.
|
GCCP-2
|
anwara
|
|
1.31
|
|
|
34.00
|
M/S. Khaza Barib-E-Newaz® Enterprise
|
16.13
|
|
06/04/2017
|
13/08/2017
|
100
|
|
|
|
|
48
|
GCHDP-WD-VZR–CHT-ANOW–MAIN-17/07
|
Chunna Para Madrasa Road By Dense Carpeting at Ch. 00-535m.
|
GCCP-2
|
anwara
|
|
0.80
|
|
|
16.00
|
M/S. Jashim & Brothers
|
14.49
|
|
20/11/2017
|
27/02/2018
|
100
|
|
|
|
|
49
|
GCHDP-WD-VZR–CHT-ANOW–MAIN-18/02
|
South Tailardip Beryvad Road (Sorkar Hat Cow Bazar-Bodi Alam) By Dense Carpeting at Ch. 00–235m.
|
GCCP-2
|
anwara
|
|
0.54
|
|
|
16.10
|
M/S. Kabir Enterprise
|
15.26
|
|
|
|
0
|
|
|
|
|
50
|
GCHDP-WD-VZR–CHT-ANOW–MAIN-18/05
|
Dattar Hat Road By Dende Carpeting at ch.00-930m
|
GCCP-2
|
anwara
|
|
0.24
|
|
|
16.10
|
M. S. Jashim & Brothers
|
15.94
|
|
|
|
100
|
|
|
|
|
51
|
GCHDP-WD-VZR–CHT-ANOW–MAIN-17/06
|
Billpur Road By Dense Carpeting at Ch. 00-536m
|
GCCP-2
|
anwara
|
|
0.93
|
|
|
16.10
|
M/S. Abddus Sabur
|
10.90
|
|
21/11/2017
|
28/02/2018
|
100
|
|
|
|
|
52
|
GCHDP-WD-VZR–CHT-ANOW–MAIN-18/08
|
Chatary Bazar-School & Local Bazar (Abdul Aziz DC ) Road By Dende Carpeting at ch.600-1420m
|
GCCP-2
|
anwara
|
|
0.54
|
|
|
11.50
|
M/S. Abdus Sabur
|
18.23
|
|
|
|
70
|
|
|
|
|
53
|
GCHDP-WD-UNR-CHT-ANOW -16/01
|
Roypur Up office-Dovashi Bazar Road By BC Ch. 1150-2050m.
|
GCCP-2
|
anwara
|
|
|
|
|
0.00
|
M/S.The Engineers Syndicate
|
53.27
|
|
05/05/2016
|
12/10/2016
|
70
|
|
|
|
|
54
|
GCHDP-WD-UNR-CHT-ANOW -16/03
|
Haildhar UP Office-Hazir Hat Road (Hasan Ali Munsi Road) By BC at Ch. 1558m-2998m.
|
GCCP-2
|
anwara
|
|
0.90
|
|
|
80.00
|
M/S.A.Ali Chowdhury
|
80.37
|
|
09/05/2016
|
16/11/2016
|
100
|
|
|
|
|
55
|
GCHDP-WD-UNR-CHT-ANOW -16/02
|
Rustom Hat-Kanu Mazir Bazar Via Borumchari UP Office (Borumchara Hazari Road) Road By Bc at Ch. 4260m-5220m)
|
GCCP-2
|
anwara
|
|
1.44
|
|
|
84.00
|
M/S. Abdus Sabur
|
55.99
|
|
20/02/2017
|
27/06/2017
|
70
|
|
|
|
|
56
|
GCHDP-WD-UNR-CHT-ANOW -18/04
|
Anowara - Dhanpura Road (Hazi Abdul Zalil Road) By BC at Ch.990-1680m.
|
GCCP-2
|
anwara
|
|
0.96
|
|
|
56.00
|
|
0.00
|
|
|
|
0
|
|
|
|
|
57
|
GCHDP-WD-UNR-CHT-ANOW -18/05
|
Barasat UP Office-Parkibazar Road (Amir Hossain Dobashi Road) By BC at Ch. 2145-3000m.
|
GCCP-2
|
anwara
|
|
0.69
|
|
|
84.50
|
|
0.00
|
|
|
|
0
|
|
|
|
|
58
|
GCHDP-WD-VZR-CHT-ANOW -16/10
|
Borkol Bridge-Tisori Silalia mamurkhain Bazar Road By BC at Ch . 00-1000m.
|
GCCP-2
|
anwara
|
|
|
|
|
0.00
|
M/S.The Engineers Suydicate.
|
47.31
|
|
05/05/2016
|
15/04/2017
|
100
|
|
|
|
|
59
|
GCHDP-WD-VZR-CHT-ANOW -16/09
|
Tangarpod-Lala nagar Bazar Road By BC at Ch: 1450m-2250m.
|
GCCP-2
|
anwara
|
|
1.00
|
|
|
59.00
|
M/S.Saired Enterprise
|
51.89
|
|
08/06/2016
|
15/12/2016
|
100
|
|
|
|
|
60
|
GCHDP-WD-VZR-CHT-ANOW-16/06
|
Kainpura-Bakhine Road By RCC at Ch. 720m-1500m.
|
GCCP-2
|
anwara
|
|
0.80
|
|
|
59.00
|
M/S. Milton Traders
|
50.63
|
|
26/02/2017
|
05/07/2017
|
70
|
|
|
|
|
61
|
GCHDP-WD-VZR-CHT-ANOW–STR-17/07
|
Construction of 37.00m Long RCC Girder Bridge on Kainpura- Bakhine Road at Ch: 02+650Km.
|
GCCP-2
|
anwara
|
|
0.78
|
|
|
56.00
|
M/S. Yousuf Construction
|
225.07
|
|
11/06/2017
|
18/12/2018
|
65
|
|
|
|
|
62
|
GCHDP-WD- VZR –CHT-ANOW -16/17
|
Chanamoti Boddho Mondir to Master Bari Road By BC at Ch: 00-255m..
|
GCCP-2
|
anwara
|
|
|
|
|
217.77
|
M/S. Sufia Enterprise
|
13.98
|
|
20/11/2017
|
27/03/2018
|
0
|
|
|
|
|
63
|
GCHDP-WD-VZR-CHT-ANOW-16/06
|
Khaskama Anowara College Cnnenting (Kaskhama College Road) Road By HBB & BC at Ch.1135-1780m & 1780m -2500m
|
GCCP-2
|
anwara
|
|
0.26
|
|
|
16.50
|
M/S. Jashim & Brothers
|
55.89
|
|
30/11/2017
|
07/04/2018
|
100
|
|
|
|
|
64
|
GCHDP-WD-VZR-CHT-ANOW-16/19
|
Ramkrisna Ashram (Krisnokumar Sucharu Praba Road) Road By Bc at Ch. 00m-785m)
|
GCCP-2
|
anwara
|
|
1.37
|
|
|
59.00
|
M/S Saired Enterprise
|
42.93
|
|
12/06/2017
|
19/10/2017
|
100
|
|
|
|
|
65
|
GCHDP-WD-VZR-CHT-ANOW-STR -18/15
|
Construction of 32.00m Long P.C Girder Bridge on Singhara Keya Ghar Road at Ch.2600m.
|
GCCP-2
|
anwara
|
|
0.79
|
|
|
56.00
|
M/S. Tahira Enterprise
|
216.33
|
|
|
|
0
|
|
|
|
|
66
|
GCHDP-WD-VZR-CHT-ANOW -18/02
|
Late-Aktaruzzaman Chy. Road ( Roipur chunnapara) Road By BC ( Annar Ali Shikder Bazar-Joidder Hat Road) at ch. 00-850m.
|
GCCP-2
|
anwara
|
|
|
|
|
216.33
|
|
0.00
|
|
|
|
0
|
|
|
|
|
67
|
GCHDP-WD-VZR-CHT-ANOW -18/04
|
Hazrat Samad Shah Road By BC at Ch.00-850m.
|
GCCP-2
|
anwara
|
|
0.85
|
|
|
56.00
|
|
0.00
|
|
|
|
0
|
|
|
|
|
68
|
GCHDP-WD-VZR-CHT-ANOW -18/08
|
Shadad Khan Road By RCC at ch. 00-550m.
|
GCCP-2
|
anwara
|
|
0.85
|
|
|
56.00
|
|
0.00
|
|
|
|
0
|
|
|
|
|
69
|
GCHDP-WD-VZR-CHT-ANOW -18/12
|
Borumchara Ukil Bari Road By BC at ch. 120-540m.
|
GCCP-2
|
anwara
|
|
|
|
|
56.00
|
|
0.00
|
|
|
|
0
|
|
|
|
|
70
|
GCHDP-WD-VZR-CHT-ANOW -18/14
|
East Haildhar Rezaul Karim Chowdhury Road By RCC at ch. 00-550m.
|
GCCP-2
|
anwara
|
|
|
|
|
28.00
|
|
0.00
|
|
|
|
0
|
|
|
|
|
71
|
GCHDP-WD-VZR-CHT-ANOW -18/16
|
Gobadia Chaltatoli Road By BC Ch: 2210-3000m.
|
GCCP-2
|
anwara
|
|
0.55
|
|
|
56.00
|
M/S. Shah Ali Roza Steel Corporation
|
49.36
|
|
|
|
0
|
|
|
|
|
72
|
GCHDP-WD-VZR-CHT-ANOW- EX-16/20
|
Beelpur Chunapara ( Alhaz Nagu Mia Road) By RCC at Ch.00-120m.
|
GCCP-2
|
anwara
|
|
|
|
|
0.00
|
M/S. Quashem Construction
|
28.79
|
|
|
|
80
|
|
|
|
|
73
|
GCHDP-WD-UNR–CHT-BANS –MAIN-16/01
|
Puichari UP to Khudukkhali Bazar(Prem bazar-Chanua Emb.) Road By Dense Carpeting at Ch. 00–1000m.
|
GCCP-2
|
banskhali
|
|
|
|
|
0.00
|
M/S. Hakim & Brothers
|
29.14
|
|
30/05/2017
|
06/10/2017
|
100
|
|
|
|
|
74
|
GCHDP-WD-FRB-CHT-BANS-STR-17/03
|
Construction of 36.00m Long PC Girder Bridge on Moulobi Bazar at Shekherkhil- Chanua Road over Jalkadar Khal at Ch. 5100m.
|
GCCP-2
|
banskhali
|
|
|
|
|
0.00
|
M/S. Nipa Enterprise-QC(JV)
|
379.10
|
|
08/08/2017
|
20/02/2019
|
65
|
|
|
|
|
75
|
GCHDP-WD-FRB-CHT-BANS -17/02
|
Arabsha Bazar GC-Ishwar Babur Hat GC Road via Bashirullah Miazi Hat Chonua Gandamara Saral Shadonpur UP (Moulana Ashraf Ali Road) Road By BC at Ch. 4250-4960m.
|
GCCP-2
|
banskhali
|
|
|
|
|
418.53
|
M/S.S. S. Corporation
|
65.40
|
|
26/10/2017
|
02/04/2018
|
100
|
|
|
|
|
76
|
GCHDP-WD-UNR –CHT-BANSHKHALI -16/01
|
Pairang- Jaliaghata Road By BC at Ch. 00-1500m.
|
GCCP-2
|
banskhali
|
|
|
|
|
0.00
|
M/S.Ahnaf Associates
|
100.00
|
|
19/04/2016
|
15/06/2017
|
100
|
|
|
|
|
77
|
GCHDP-WD-UNR –CHT-BANS -16/03
|
Saral UP office-Shilkup UP office Road By BC at Ch: 4465m-5265m.
|
GCCP-2
|
banskhali
|
|
2.00
|
|
|
113.00
|
M/S. Romena Enterprise
|
48.37
|
|
08/12/2016
|
15/04/2017
|
100
|
|
|
|
|
78
|
GCHDP-WD-UNR –CHT-BANS -16/05
|
Chunoti Bazar-Basirullah Miazi Bazar-Mosharaf Miazi Bazar Upto Upokulio College Bari Bundh Road.(West Side of Jalkodor Khal) By HBB at Ch: 3696-4675m
|
GCCP-2
|
banskhali
|
|
0.80
|
|
|
56.00
|
M/S.S.S Corporation
|
28.46
|
|
12/07/2017
|
19/11/2017
|
100
|
|
|
|
|
79
|
GCHDP-WD-UNR –CHT-BANS -16/04
|
Napora bazar-Shaker khil UP office Road By HBB at Ch: 780-2700m
|
GCCP-2
|
banskhali
|
|
0.98
|
|
|
31.45
|
M/S.Hakim & Brothers
|
55.82
|
|
20/07/2017
|
27/11/2017
|
80
|
|
|
|
|
80
|
GCHDP-WD-UNR-CHT-BANS -18/02
|
Kalipur UP to Khankhanabad bazar (Gunagari-Khankhanabad Road) Road By BC at Ch.4950-5750m.
|
GCCP-2
|
banskhali
|
|
1.92
|
|
|
60.85
|
|
0.00
|
|
|
|
0
|
|
|
|
|
81
|
GCHDP-WD-VZR–CHT-BANS-17/01
|
West Banshkhali High School to Karim Bazar Road By HBB at Ch. 10-50m & 1550-2010m.
|
GCCP-2
|
banskhali
|
|
|
|
|
0.00
|
M/S. Azad Enterprise
|
20.09
|
|
|
|
100
|
|
|
|
|
82
|
GCHDP-WD-VZR –CHT-BANS -16/03
|
Shilkup Izzatia Road By HBB at Ch: 00m-500m.
|
GCCP-2
|
banskhali
|
|
0.50
|
|
|
50.00
|
|
0.00
|
|
|
|
0
|
|
|
|
|
83
|
GCHDP-WD-VZR –CHT-BANS -16/02
|
Asighar para Shaitgharpara Ailyar para Khalashipara Road By HBB at Ch: 500-1500m
|
GCCP-2
|
banskhali
|
|
1.00
|
|
|
33.00
|
M/S.S.S Corporation
|
29.10
|
|
12/07/2017
|
19/11/2017
|
100
|
|
|
|
|
84
|
GCHDP-WD-VZR-CHT- BANS -18/04
|
Jaliapara Puran Bazar- Monsuria Bazar- Shilkup UP office Link Road ( Middle Mankirchar Puran Bazar link Road) By HBB at Ch.00-730m.
|
GCCP-2
|
banskhali
|
|
1.00
|
|
|
32.00
|
M/S. Janasheba Enterprise
|
30.14
|
|
|
|
0
|
|
|
|
|
85
|
GCHDP-WD-UNR-CHT-BOAL-MAIN16/01
|
Murad Munshihat –Chowdhury Hat-Via- Kadhurkhil UP Road (Chowdhury Hat D.C Road) By Dense Carpeting at Ch. 1520–4450m.
|
GCCP-2
|
boalkhali
|
|
2.93
|
|
|
46.00
|
M/S. Julda Brick Manufacturing
|
90.28
|
|
06/04/2017
|
13/08/2017
|
100
|
|
|
|
|
86
|
GCHDP-WD-UNR–CHT-BOAL–MAIN-17/02
|
ShakPura UP-Golokmunshir Hat (LM0-Pachim Gomdandi UP Road(ShakPura D.C Road) By Dense Carpeting at Ch. 1058-1880m.
|
GCCP-2
|
boalkhali
|
|
0.82
|
|
|
46.00
|
M/S. Forak Ahmed & Sons
|
59.69
|
|
19/06/2017
|
26/09/2017
|
100
|
|
|
|
|
87
|
GCHDP-WD-FRB–CHT-BOAL –MAIN-17/01
|
Ali Ahamed Commissioner Raod(From RHD#145)(Shakpura Murgir Firm-Nurullah Munsir Hat) By Dense Carpeting at Ch. 9100-10175m.
|
GCCP-2
|
boalkhali
|
|
1.08
|
|
|
42.00
|
M/S. Forak Ahmed & Sons
|
37.26
|
|
15/05/2017
|
22/09/2017
|
100
|
|
|
|
|
88
|
GCHDP-WD-FRB-CHT-BOAL-16/01
|
Fultol-Kanungo Para (R&H) - Lalarhat G.C Road By Bc at Ch. 00m-600m)
|
GCCP-2
|
boalkhali
|
|
0.60
|
|
|
72.00
|
M/S. TowaKKul Enterprise
|
44.93
|
|
18/05/2017
|
25/09/2017
|
100
|
|
|
|
|
89
|
GCHDP-WD-UNR-CHT-BOAL-16/01
|
Shahed Dherandra Aminul Haque Chairman Road By BC at Ch.1800-2275m.
|
GCCP-2
|
boalkhali
|
|
0.48
|
|
|
28.00
|
M/S.Kaderia Enterprise
|
31.32
|
|
12/11/2017
|
19/04/2018
|
40
|
|
|
|
|
90
|
GCHDP-WD-UNR-CHT-BOAL-16/02
|
Kanungo Para Post Office Road By BC at Ch: 1150m-2350m.
|
GCCP-2
|
boalkhali
|
|
1.20
|
|
|
42.00
|
M/S.Jaker Hossen.
|
74.69
|
|
27/06/2016
|
04/01/2017
|
100
|
|
|
|
|
91
|
GCHDP-WD-UNR-CHT-BOAL-16/03
|
Amuchia Guccha gram Road By BC at Ch: 00m-1000m.
|
GCCP-2
|
boalkhali
|
|
1.00
|
|
|
51.00
|
Md. Sajia Trading
|
73.73
|
|
26/06/2016
|
03/01/2017
|
100
|
|
|
|
|
92
|
GCHDP-WD-UNR-CHT-BOAL-16/05
|
Monir Ahmed Road By BC at Ch.3100-3525m.
|
GCCP-2
|
boalkhali
|
|
0.42
|
|
|
33.00
|
M/S. Alam Company
|
24.97
|
|
23/01/2017
|
30/06/2017
|
100
|
|
|
|
|
93
|
GCHDP-WD-UNR-CHT-BOAL-16/04
|
Chand Chowdhury Road Popadia Road By HBB at Ch: 1380-2015m
|
GCCP-2
|
boalkhali
|
|
0.64
|
|
|
42.00
|
M/S. Abdul Salam
|
33.29
|
|
04/07/2017
|
11/11/2017
|
100
|
|
|
|
|
94
|
GCHDP-WD-VZR-CHT-BOAL-16/02
|
Maharram Nesa Road By BC at Ch.1000-1365m.
|
GCCP-2
|
boalkhali
|
|
0.37
|
|
|
28.00
|
M/S. Sultana Enterprise
|
20.54
|
|
15/12/2016
|
|
100
|
|
|
|
|
95
|
GCHDP-WD-VZR-CHT-BOAL-17/05
|
Jastiapura Fatarkhil Asryan Road By HBB at Ch. 633-1033m.
|
GCCP-2
|
boalkhali
|
|
0.40
|
|
|
14.00
|
M/S. KGN Enterprise
|
14.09
|
|
10/10/2017
|
17/03/2018
|
100
|
|
|
|
|
96
|
GCHDP-WD-VZR-CHT-BOAL-16/04
|
Purba Dhorolla Kali Bari Road By BC at Ch: 00m-1160m.
|
GCCP-2
|
boalkhali
|
|
1.16
|
|
|
22.00
|
M/S. Shormin Enterprice
|
68.03
|
|
12/07/2016
|
19/01/2017
|
100
|
|
|
|
|
97
|
GCHDP-WD-VZR-CHT-BOAL-16/06
|
Sreepur Muktizoddah Kamal Uddain Ahmed Road By BC at Ch.00-360m.
|
GCCP-2
|
boalkhali
|
|
0.36
|
|
|
22.00
|
M/S. Towakkul Ent.
|
20.72
|
|
26/12/2016
|
02/06/2017
|
60
|
|
|
|
|
98
|
GCHDP-WD-VZR-CHT-BOAL-16/11
|
Bijan BiBi Madrasha Road By BC at Ch.00-350m.
|
GCCP-2
|
boalkhali
|
|
0.35
|
|
|
14.00
|
M/S. Towakkul Enterprise
|
15.64
|
|
26/12/2016
|
02/06/2017
|
100
|
|
|
|
|
99
|
GCHDP-WD-VZR-CHT-BOAL-16/13
|
Jostiapura Golikishory Mondir Road By BC at Ch. 00-670m (ID No. 415124087)
|
GCCP-2
|
boalkhali
|
|
0.67
|
|
|
33.00
|
M/S. Shormin Enterprise
|
23.78
|
|
08/01/2017
|
15/05/2017
|
100
|
|
|
|
|
100
|
GCHDP-WD-VZR-CHT-BOAL-16/14
|
Paschim Kharandwip Bura Mowlana Road By Bc at Ch:00m-310m.
|
GCCP-2
|
boalkhali
|
|
0.31
|
|
|
16.00
|
M/S. Well Enterprise
|
14.38
|
|
28/02/2017
|
07/07/2017
|
60
|
|
|
|
|
101
|
GCHDP-WD-VZR-CHT-BOAL-16/15
|
Kharandwip Babu Chinta Horon Day Road By HBB at Ch:00m-415m.
|
GCCP-2
|
boalkhali
|
|
0.42
|
|
|
16.00
|
M/S.Ali Store
|
14.45
|
|
22/02/2017
|
30/06/2017
|
100
|
|
|
|
|
102
|
GCHDP-WD-VZR-CHT-BOAL-16/17
|
Hazi Ahamed Miah Road By BC at Ch.900-1240m.
|
GCCP-2
|
boalkhali
|
|
0.34
|
|
|
14.00
|
M/S. Abrar Const.
|
18.75
|
|
19/12/2016
|
26/05/2017
|
100
|
|
|
|
|
103
|
GCHDP-WD-VZR-CHT-BOAL-16/18
|
Shahid Rustam Road By BC at Ch.700-1110m.
|
GCCP-2
|
boalkhali
|
|
0.41
|
|
|
22.00
|
M/S. Jannat Enterprise
|
25.10
|
|
12/07/2017
|
19/12/2017
|
100
|
|
|
|
|
104
|
GCHDP-WD-VZR-CHT-BOAL-16/19
|
Khitabchar Nabarun Sanga Road By BC at Ch: 00m-1015m.
|
GCCP-2
|
boalkhali
|
|
1.02
|
|
|
22.00
|
M/S. Sultana Enterprise.
|
52.75
|
|
06/10/2016
|
|
100
|
|
|
|
|
105
|
GCHDP-WD-VZR-CHT-BOAL-16/01
|
Shaid Sipahi Md.Nayeb Ali Road (Loson Mohajan Road) By HBB at Ch.00-800m.
|
GCCP-2
|
boalkhali
|
|
0.80
|
|
|
28.00
|
M/S.Goni Construction
|
26.37
|
|
22/01/2017
|
29/05/2017
|
50
|
|
|
|
|
106
|
GCHDP-WD-VZR-CHT-BOAL-16/09
|
Grameen Bank Road, Popiadia Road By BC at Ch: 1450-1730m.
|
GCCP-2
|
boalkhali
|
|
0.28
|
|
|
22.00
|
M/S Suriya Traders
|
19.90
|
|
22/05/2017
|
29/09/2017
|
100
|
|
|
|
|
107
|
GCHDP-WD-VZR-CHT-BOAL-16/10
|
Popadia Shahid Hasan Road By BC at Ch: 2006-2266m.
|
GCCP-2
|
boalkhali
|
|
0.26
|
|
|
22.00
|
M/S.Khair & Sons
|
19.35
|
|
02/11/2017
|
09/03/2018
|
100
|
|
|
|
|
108
|
GCHDP-WD-VZR-CHT-BOAL-16/12
|
Siraj Fakir Road By HBB at Ch: 110-435m
|
GCCP-2
|
boalkhali
|
|
0.33
|
|
|
22.00
|
M/S. Jaker Hossen
|
11.03
|
|
26/04/2017
|
03/09/2017
|
100
|
|
|
|
|
109
|
GCHDP-WD-VZR–CHT-BOAL-17/07
|
Kanongopara R&H Bura Mosque-Tajghar Road ( Dhalghat D.C Road) By BC at Ch. 1300-1570m.
|
GCCP-2
|
boalkhali
|
|
0.27
|
|
|
14.00
|
M/S. Soliman Store
|
16.12
|
|
|
|
70
|
|
|
|
|
110
|
GCHDP-WD-VZR–CHT-BOAL-17/08
|
Loghonat Kanongo Bridge- Master Bazar (Datta Chowdhury Road) Road By BC at Ch. 5000-5312m.
|
GCCP-2
|
boalkhali
|
|
0.31
|
|
|
22.50
|
M/S. Jannat Enterprise
|
21.50
|
|
|
|
0
|
|
|
|
|
111
|
GCHDP-WD-FRB–CHT-CHAN –MAIN-17/01
|
Dohazari-Lalutia Raod By Dense Carpeting at Ch. 00-1000m
|
GCCP-2
|
chandanish
|
|
|
|
|
0.00
|
M S Nirman Sangstha
|
26.52
|
|
21/08/2017
|
28/12/2017
|
100
|
|
|
|
|
112
|
GCHDP-WD-VZR–CHT-CHAN –MAIN-16/01
|
Patiya Tea Garden Road By Dense Carpeting at Ch. 00–1000m.
|
GCCP-2
|
chandanish
|
|
1.00
|
|
|
27.00
|
M/S. Jalil Builders
|
22.38
|
|
08/12/2016
|
15/04/2017
|
100
|
|
|
|
|
113
|
GCHDP-WD-VZR–CHT-CHAN –MAIN-16/08
|
Chagachar Barudkhana Rd (Dohazari) Road By Dense Carpeting at Ch. 265–595m.
|
GCCP-2
|
chandanish
|
|
1.00
|
|
|
0.00
|
M S Nirman Sangstha
|
5.78
|
|
03/04/2017
|
10/08/2017
|
100
|
|
|
|
|
114
|
GCHDP-WD-VZR–CHT-CHAN –MAIN-16/04
|
Barkal Shahid Rafique Road By Dense Carpeting at Ch. 00–810m.
|
GCCP-2
|
chandanish
|
|
0.33
|
|
|
6.30
|
M/S. Nirman Sangstha
|
12.99
|
|
08/05/2017
|
15/09/2017
|
100
|
|
|
|
|
115
|
GCHDP-WD-VZR–CHT-CHAN –MAIN-16/02
|
South-Purboo Hasimpur M.K high school-Shikderpara Road By Dense Carpeting at Ch. 00–757m.
|
GCCP-2
|
chandanish
|
|
0.81
|
|
|
14.00
|
M/S. Hazi M A Sidker Traders
|
10.71
|
|
25/04/2017
|
02/09/2017
|
100
|
|
|
|
|
116
|
GCHDP-WD-VZR–CHT-CHAN –MAIN-16/07
|
Kashua Sayed Bazar to Maddham para-Purba para Connecting Road By Dense Carpeting at Ch. 00–400m.
|
GCCP-2
|
chandanish
|
|
0.76
|
|
|
11.90
|
M/S. Alam & Company
|
8.43
|
|
21/03/2017
|
28/07/2017
|
100
|
|
|
|
|
117
|
GCHDP-WD-VZR–CHT-CHAN –MAIN-16/05
|
Badurpara Munsifbazar chamudaria Rd Road By Dense Carpeting at Ch. 00–2000m.
|
GCCP-2
|
chandanish
|
|
0.40
|
|
|
8.98
|
M/S. Nirman Sangstha
|
22.86
|
|
24/05/2017
|
30/09/2017
|
100
|
|
|
|
|
118
|
GCHDP-WD-VZR–CHT-CHAN –MAIN-16/03
|
Muradabad-Uttar Kanchan Nogor Road By Dense Carpeting at Ch. 00–740m.
|
GCCP-2
|
chandanish
|
|
2.00
|
|
|
22.91
|
S & S Trading
|
16.26
|
|
24/10/2017
|
28/02/2018
|
100
|
|
|
|
|
119
|
GCHDP-WD-VZR–CHT-CHAN –MAIN-16/06
|
Omar Sultan road (Kanchanabad) Road By Dense Carpeting at Ch. 00–820m.
|
GCCP-2
|
chandanish
|
|
0.74
|
|
|
16.94
|
M/S. Alam & Company
|
19.68
|
|
03/04/2017
|
10/08/2017
|
85
|
|
|
|
|
120
|
GCHDP-WD-UNR–CHT-CHAN –MAIN-16/01
|
Diakul-Chringghata-Dhopachari-Monglarmokh-Rangunia Road By Dense Carpeting at Ch. 6500–7500m.
|
GCCP-2
|
chandanish
|
|
0.82
|
|
|
21.86
|
M/S. S. m nirman sangstha
|
9.50
|
|
03/04/2017
|
10/08/2017
|
100
|
|
|
|
|
121
|
GCHDP-WD-UZR-CHT-CHAN -18/01
|
Chandanish Upazila HQ -Nayarhat-Bailtali-Kodarhat GC Road By BC at Ch: 1975-4099m.
|
GCCP-2
|
chandanish
|
|
|
|
|
0.00
|
|
0.00
|
|
|
|
0
|
|
|
|
|
122
|
GCHDP-WD-UNR-CHT-CHAN -16/01
|
Diakul-Chiringghata-Dhopachari-Monglarmokh-Rangunia Road.(Dopachori Bazar mukh-Santirhat) By HBB at Ch: 8590m-12810m.
|
GCCP-2
|
chandanish
|
|
|
|
|
0.00
|
M/S.Mostafa & Son’s.
|
168.60
|
|
16/05/2016
|
08/10/2017
|
100
|
|
|
|
|
123
|
GCHDP-WD-UNR-CHT-CHAN-STR-17/01
|
Construction of 81.00m Long PC Girder Bridge Over Zero Book Chara on Vhomang hat GC- Diakul-Chringghata-Dhopachari-Monglarmokh-Rangunia Road at Ch. 13460m .
|
GCCP-2
|
chandanish
|
|
4.22
|
|
|
178.00
|
AR-ALML JV
|
412.04
|
|
|
|
25
|
|
|
|
|
124
|
GCHDP-WD-UNR-CHT-CHAN -16/02
|
Kanchanabad-Station-Mohammapur-Fatanagor road By BC at Ch: 00m-925m.
|
GCCP-2
|
chandanish
|
|
|
|
|
384.83
|
M/S.S.M Yosuf Brothers
|
50.04
|
|
18/05/2016
|
15/06/2017
|
100
|
|
|
|
|
125
|
GCHDP-WD-UNR-CHT-CHAN -16/06
|
Simirkul-Bolar Pahar Panjagonar Mukh Dhopachari RHD Connecting Road By HBB at Ch: 220-680m.
|
GCCP-2
|
chandanish
|
|
0.93
|
|
|
56.00
|
M/S. ARM Engineers
|
57.91
|
|
23/07/2017
|
30/11/2017
|
0
|
|
|
|
|
126
|
GCHDP-WD-UNR-CHT-CHAN -18/05
|
Khan Hat GC - Hashimpur U. P Office Road By HBB at Ch.00-100m.
|
GCCP-2
|
chandanish
|
|
|
|
|
46.50
|
M S Nirman Sangstha
|
44.70
|
|
|
|
80
|
|
|
|
|
127
|
GCHDP-WD-UNR-CHT-CHAN -18/07
|
Barkal UP-Treener Hat M.N.A.Shona Mia Chow. Road) Road By HBB at Ch.00-720m.
|
GCCP-2
|
chandanish
|
|
1.00
|
|
|
33.50
|
Hasina Construction
|
33.87
|
|
|
|
0
|
|
|
|
|
128
|
GCHDP-WD-VZR-CHT-CHAN -16/01
|
Durlop Chowdhury Para Road By BC at Ch: 00m-1510m.
|
GCCP-2
|
chandanish
|
|
|
|
|
0.00
|
M/S.Shahjahan Chowdhury
|
89.10
|
|
24/05/2016
|
01/06/2017
|
100
|
|
|
|
|
129
|
GCHDP-WD-VZR-CHT-CHAN -16/02
|
Soirapukur par to Chowdhury para Road By BC at Ch: 00m-550m.
|
GCCP-2
|
chandanish
|
|
1.51
|
|
|
39.00
|
M/S.S.M Yousuf Brothers
|
35.17
|
|
18/05/2016
|
15/06/2017
|
100
|
|
|
|
|
130
|
GCHDP-WD-VZR-CHT-CHAN -16/07
|
Kanchanabad H/S Road By BC at Ch: 290m-690m.
|
GCCP-2
|
chandanish
|
|
0.55
|
|
|
39.00
|
M.J Construction
|
28.22
|
|
02/11/2017
|
09/03/2018
|
70
|
|
|
|
|
131
|
GCHDP-WD-VZR-CHT-CHAN -16/05
|
North Muraderbad-East Elahabad Road By BC at Ch: 00m-630m.
|
GCCP-2
|
chandanish
|
|
0.40
|
|
|
28.00
|
M/S.S.M Yosuf Brothers.
|
36.63
|
|
18/05/2016
|
15/06/2017
|
100
|
|
|
|
|
132
|
GCHDP-WD-VZR-CHT-CHAN -16/09
|
Amitab Sen (Boroma) Road By Bc at Ch. 00m-375m.
|
GCCP-2
|
chandanish
|
|
0.63
|
|
|
39.00
|
M/S. NiRman Sangstha
|
22.82
|
|
05/06/2017
|
12/10/2017
|
70
|
|
|
|
|
133
|
GCHDP-WD-VZR-CHT-CHAN -16/21
|
Abadatkhana to Sonaicharikul Road By HBB at Ch: 00-500m.
|
GCCP-2
|
chandanish
|
|
0.38
|
|
|
28.00
|
S K B Enterprise
|
21.80
|
|
04/05/2017
|
11/09/2017
|
100
|
|
|
|
|
134
|
GCHDP-WD-VZR-CHT-CHAN -16/06
|
Pachim Alahabad Talukder Bari Road By BC at Ch: 00-510m.
|
GCCP-2
|
chandanish
|
|
0.50
|
|
|
23.00
|
M/S.Nasir Enterprise
|
32.34
|
|
27/04/2017
|
03/09/2017
|
60
|
|
|
|
|
135
|
GCHDP-WD-VZR-CHT-CHAN-16/19
|
Kashaipara-Jatarkul Road Chandanaish Pourashava Road By HBB at Ch. 317-975m
|
GCCP-2
|
chandanish
|
|
0.51
|
|
|
33.00
|
M/S. Mans Traders
|
21.36
|
|
|
|
75
|
|
|
|
|
136
|
GCHDP-WD-VZR-CHT-CHAN-18/03
|
East Zoara-Mahabub Market Nidhirampara Road By BC at Ch.930-1668m.
|
GCCP-2
|
chandanish
|
|
0.66
|
|
|
21.36
|
|
0.00
|
|
|
|
0
|
|
|
|
|
137
|
GCHDP-WD-VZR-CHT-CHAN-18/04
|
Chandanish upazila-Karanibari Nayapara-Idherampur Road By BC at Ch.00-811m.
|
GCCP-2
|
chandanish
|
|
0.74
|
|
|
39.00
|
|
0.00
|
|
|
|
0
|
|
|
|
|
138
|
GCHDP-WD-VZR-CHT-CHAN-18/10
|
Hazarat VoiKhaja Road (Joara) Road By BC at Ch.00-686m.
|
GCCP-2
|
chandanish
|
|
|
|
|
28.00
|
|
0.00
|
|
|
|
0
|
|
|
|
|
139
|
GCHDP-WD-VZR-CHT-CHAN-18/11
|
Fateh nagor Mohabodhi Road (Joara) By BC at Ch.00-500m.
|
GCCP-2
|
chandanish
|
|
0.69
|
|
|
39.00
|
|
0.00
|
|
|
|
0
|
|
|
|
|
140
|
GCHDP-WD-UNR–CHT-FATI –MAIN-16/01
|
Fatickchari Upazilla H .Q -Chamur Hat Road via Kanchan nagar UP. H.Q. Road By Dense Carpeting at Ch. 00–1000m.
|
GCCP-2
|
fatikchari
|
|
|
|
|
23.00
|
M/S. Hordoy Kumar Chakma
|
19.80
|
|
08/02/2017
|
15/06/2017
|
100
|
|
|
|
|
141
|
GCHDP-WD-VZR-CHT-FATI-MAIN-18/02
|
Nanupur UPC-Dowlat Munshir Hat Road Nanupur-Khiram Road By Dense Carpeting at Ch.200-1500m
|
GCCP-2
|
fatikchari
|
|
1.00
|
|
|
23.00
|
M/S. Rubel Enterprise
|
17.24
|
|
|
|
0
|
|
|
|
|
142
|
GCHDP-WD-VZR–CHT-FATI–MAIN-NEW -18/01
|
Hazrat Shah Ahmedullah Road By Dense Carpeting at Ch. 300–800m.
|
GCCP-2
|
fatikchari
|
|
1.30
|
|
|
11.34
|
|
0.00
|
|
|
|
0
|
|
|
|
|
143
|
GCHDP-WD-FRB –CHT-FATI -16/01
|
Kazirhat G.C to Baro Darogarhat G.C. Road via Barabil Nayahat lalarhat Road By HBB at Ch: 5700m-9470m.
|
GCCP-2
|
fatikchari
|
|
|
|
|
114.00
|
M/S.Hossan & Brothers
|
111.44
|
|
09/06/2016
|
16/12/2016
|
100
|
|
|
|
|
144
|
GCHDP-WD-FRB –CHT-FATI -17/01
|
Construction of 40.00m Long PC Girder Bridge on Barabil Kazirhat G.C to Lalar Hat (RHD) Road via Barabil Nayahat (Fatickchari Portion) at Ch: 8300m.
|
GCCP-2
|
fatikchari
|
|
3.77
|
|
|
268.35
|
SA-HB-JV
|
324.71
|
|
17/10/2017
|
24/01/2019
|
45
|
|
|
|
|
145
|
GCHDP-WD-UNR –CHT-FATI -16/11
|
Haruachari U.p. H.Q to Lalarhat Road via Harualchari Hospital & Santirhat Road By HBB at Ch: 350m-2150m.
|
GCCP-2
|
fatikchari
|
|
|
|
|
0.00
|
M/S. Elias Brothers
|
65.94
|
|
11/07/2016
|
18/11/2016
|
100
|
|
|
|
|
146
|
GCHDP-WD-UNR-CHT-FATI -16/12
|
Bibirhat GC- Kanchurhat Road Via North Rangmatia Natun Bazar Road By BC at Ch: 680m-1637m.
|
GCCP-2
|
fatikchari
|
|
1.80
|
|
|
56.00
|
M/S. S. Hoque & Sons Enterprise
|
54.12
|
|
17/10/2016
|
24/03/2017
|
100
|
|
|
|
|
147
|
GCHDP-WD-UNR-CHT-FATI -16/10
|
Suabil U.P. HQ to Shovanchari Bangla Bazar Road By HBB Ch:1000m-2000m.
|
GCCP-2
|
fatikchari
|
|
0.96
|
|
|
33.50
|
M/S. Dynamic International
|
31.46
|
|
14/08/2016
|
21/01/2017
|
100
|
|
|
|
|
148
|
GCHDP-WD-UNR-CHT-FATI -16/09
|
Nazirhat G.C. to Fakirhat Road via Babunagar Madrasha (Shafiul Azam road) Road By BC at Ch.2390-2870m
|
GCCP-2
|
fatikchari
|
|
1.00
|
|
|
28.00
|
M/S. Sharnali Ente.
|
21.67
|
|
22/12/2016
|
29/04/2017
|
30
|
|
|
|
|
149
|
GCHDP-WD-UNR-CHT-FATI -17/08
|
Lelang U.P.HQ.-Charalia Hat Bazar Road via Shainnashir Hat & Lelang Nayhat (Gopal Gatta) Road By BC at Ch: 1350-1900m.
|
GCCP-2
|
fatikchari
|
|
0.48
|
|
|
33.00
|
M/S. Arif Enterprise
|
32.21
|
|
30/08/2017
|
06/01/2018
|
80
|
|
|
|
|
150
|
GCHDP-WD-UNR-CHT-FATI–STR-17/03
|
Construction of 32.00m Long PC Girder Bridge on Dantmara U.P.HQ.to Balutila Bazar via Ziltoli Bazar Road Over Balukhali Khal Road at Ch: 10+450Km.
|
GCCP-2
|
fatikchari
|
|
0.55
|
|
|
212.61
|
M/S. Quashem Construction
|
202.52
|
|
11/09/2017
|
26/02/2019
|
80
|
|
|
|
|
151
|
GCHDP-WD-UNR-CHT-FATI -17/02
|
Mohammed Tokirhat GC-Samitirhat UP Office Road By HBB at Ch. 3130-3815m
|
GCCP-2
|
fatikchari
|
|
|
|
|
33.50
|
M/S. Jahangir Alam Traders
|
33.29
|
|
|
|
90
|
|
|
|
|
152
|
GCHDP-WD-UNR-CHT-FATI -17/02(01)
|
Mohammed Tokirhat G.C - Samitirhat UP Office Road By HBB at Ch. 3130-3815m.
|
GCCP-2
|
fatikchari
|
|
0.69
|
|
|
89.11
|
M/S. Alif Enterprise
|
97.31
|
|
|
|
0
|
|
|
|
|
153
|
GCHDP-WD-UNR–CHT-FATI-17/06
|
Roshangiri U.P.HQ.to Nanupur U.P.HQ. Road By HBB at Ch. 00-800m.
|
GCCP-2
|
fatikchari
|
|
1.29
|
|
|
33.50
|
M/S. S. Hoque & Sons Enterprise
|
30.19
|
|
|
|
80
|
|
|
|
|
154
|
GCHDP-WD-UNR-CHT-FATI -18/04
|
Bagan Bazar U.P. HQ.to Natun Bazar Road By HBB at Ch: 5486-6900m.GCHDP-WD-VZR-CHT-FATI-EX-18/25
|
GCCP-2
|
fatikchari
|
|
0.80
|
|
|
58.00
|
M/S. Goni Construction
|
55.08
|
|
|
|
0
|
|
|
|
|
155
|
GCHDP-WD-UNR-CHT-FATI-EX-17/13
|
Paindong UP HQ Brindabon-Kanchannager UP HQ Road Via Kanchurhat Road By BC at Ch. 1007-3007m
|
GCCP-2
|
fatikchari
|
|
|
|
|
107.87
|
M/S. Mohshin & Brothers
|
118.58
|
|
|
|
70
|
|
|
|
|
156
|
GCHDP-WD-UNR-CHT-FATI-EX-18/28
|
Mohammad Takirhat GC – Abdullahpur UP HQ Road By BC at Ch.00-370m.
|
GCCP-2
|
fatikchari
|
|
2.00
|
|
|
62.00
|
|
0.00
|
|
|
|
0
|
|
|
|
|
157
|
GCHDP-WD-VZR-FATICKCHARI-15/12
|
Purbo Haidchakia Barua para rod (Ch. 00m–500m)
|
GCCP-2
|
fatikchari
|
|
|
|
|
37.68
|
M/S.M.R Construction
|
31.33
|
|
11/04/2016
|
18/08/2016
|
100
|
|
|
|
|
158
|
GCHDP-WD-VZR-FATICKCHARI-15/13
|
Poschim Haidchakia Barua paraRoad By HBB at Ch. 640-840m,903-1005m,1143-1213m & 1313-1430m.
|
GCCP-2
|
fatikchari
|
|
1.09
|
|
|
26.55
|
M/S A.Ali Chowdhury
|
23.06
|
|
22/03/2016
|
29/07/2016
|
100
|
|
|
|
|
159
|
GCHDP-WD-VZR-CHT-FATI -16/18
|
Khairaty para village Road By HBB at Ch: 360m-1330m.
|
GCCP-2
|
fatikchari
|
|
0.49
|
|
|
28.00
|
M/S.Alam Abser & CO.
|
25.75
|
|
23/06/2016
|
30/10/2016
|
100
|
|
|
|
|
160
|
GCHDP-WD-VZR –CHT-FATI -16/19
|
Harualchari Betuarjhil-Khamaripara Road By HBB at Ch: 00m-1178m.
|
GCCP-2
|
fatikchari
|
|
0.97
|
|
|
28.00
|
M/S.Monir Ahmed
|
25.18
|
|
20/04/2017
|
27/06/2017
|
100
|
|
|
|
|
161
|
GCHDP-WD-VZR-CHT-FATI -16/24
|
Narayanhat-Mirsarai Govania Haldah vally Tea Garden connecting Road By HBB at Ch: 500m-1010m.
|
GCCP-2
|
fatikchari
|
|
1.18
|
|
|
16.00
|
M/S. A.Ali Chowdhury
|
15.47
|
|
19/07/2016
|
26/11/2016
|
100
|
|
|
|
|
162
|
GCHDP-WD-VZR-CHT-FATI–STR-17/24
|
Construction of 32.00m Long PC Girder Bridge on Narayanhat-Mirsarai Govania Haldah vally Tea Garden connecting Road at Ch: 02+465Km.
|
GCCP-2
|
fatikchari
|
|
0.51
|
|
|
120.00
|
M/S. Quashem Construction
|
215.31
|
|
11/09/2017
|
30/12/2018
|
75
|
|
|
|
|
163
|
GCHDP-WD-VZR-CHT-FATI -16/07
|
Narayanhat Bazar-Heako GC connecting road via Maazan tea Estate Hasnabad & Nichinta Road By HBB at Ch: 00m-503m.
|
GCCP-2
|
fatikchari
|
|
|
|
|
16.00
|
M/S.Alam Abser & CO.
|
14.71
|
|
23/06/2016
|
30/10/2016
|
100
|
|
|
|
|
164
|
GCHDP-WD-VZR-CHT-FATI -16/11
|
Heako-Dhuliachari Road By HBB at Ch: 00m-503m.
|
GCCP-2
|
fatikchari
|
|
0.50
|
|
|
16.00
|
M/S. S. Haque & Sons Enterprise
|
15.80
|
|
23/06/2016
|
30/11/2016
|
100
|
|
|
|
|
165
|
GCHDP-WD-VZR-CHT-FATI -16/23
|
Poran Chowdhuri Road (Hatir pul to Fanaykhil) Road Road By HBB at Ch: 703m-1250m
|
GCCP-2
|
fatikchari
|
|
0.50
|
|
|
13.00
|
M/S.Feroja Construction
|
12.80
|
|
30/06/2016
|
07/11/2016
|
100
|
|
|
|
|
166
|
GCHDP-WD-VZR-CHT-FATI-STR -16/21
|
2-Vent 3.00mx5.00m RCC Box Culvert on Kepaitnagar Abul Fazal BA Road (Baba Bandhari Khamar Khiram Khiram Cen. Road) at Ch:3235m.
|
GCCP-2
|
fatikchari
|
|
0.55
|
|
|
16.50
|
M/S. Dynamic International
|
15.60
|
|
14/08/2016
|
21/01/2017
|
100
|
|
|
|
|
167
|
GCHDP-WD-VZR-CHT-FATI -16/05
|
Kanchannagar UP 3 no. Woard Pukurpara Kamarpara Hajee Road By HBB at Ch.00-500m
|
GCCP-2
|
fatikchari
|
|
|
|
|
16.00
|
M/S. Feroza Constr.
|
14.50
|
|
09/02/2017
|
16/06/2017
|
100
|
|
|
|
|
168
|
GCHDP-WD-VZR-CHT-FATI-16/09
|
Shantirhat-Motor Road By BC at Ch. 1600-1970m.
|
GCCP-2
|
fatikchari
|
|
0.50
|
|
|
21.91
|
M/S. Shamali Enterprise
|
21.68
|
|
22/12/2016
|
29/04/2017
|
100
|
|
|
|
|
169
|
GCHDP-WD-VZR-CHT-FATI -17/22
|
Lelang U.P-Ananda Bazar Road (Lelang UP-Gopalghata Ananda Bazar) Road By HBB at Ch: 00-415m.
|
GCCP-2
|
fatikchari
|
|
0.37
|
|
|
16.00
|
M/S. Rubel Enterprise
|
14.98
|
|
06/09/2017
|
13/01/2018
|
100
|
|
|
|
|
170
|
GCHDP-WD-VZR-CHT-FATI -17/01
|
Shah Golamur Rahman Road (Baba Bhandari Road From Lohar Pool-Shah Ahmed Ullah road connection) By HBB at Ch. 00-315m.
|
GCCP-2
|
fatikchari
|
|
0.42
|
|
|
16.00
|
M/S.Mohshin & Brothers
|
15.90
|
|
|
|
100
|
|
|
|
|
171
|
GCHDP-WD-VZR-CHT-FATI -17/15
|
Samitirhat Mufti Garibullah Shah Road By HBB at Ch. 00-435m.
|
GCCP-2
|
fatikchari
|
|
0.32
|
|
|
16.75
|
M/S. Feroza Construction
|
16.69
|
|
|
|
100
|
|
|
|
|
172
|
GCHDP-WD-VZR-CHT-FATI -18/15(01)
|
Samitirhat Mufti Garibullah Shah Road By HBB at Ch. 00-435m.
|
GCCP-2
|
fatikchari
|
|
0.44
|
|
|
52.08
|
M/S. S A Traders
|
49.48
|
|
|
|
0
|
|
|
|
|
173
|
GCHDP-WD-VZR-CHT-FATI -17/08
|
Lelang Kanchannagar Road By HBB at Ch. 00-700m.
|
GCCP-2
|
fatikchari
|
|
1.07
|
|
|
26.80
|
M/S. Alif Enterprise
|
24.07
|
|
|
|
100
|
|
|
|
|
174
|
GCHDP-WD-VZR-CHT-FATI -18/10
|
Bagan Bazar Ander Manik Noydolang Road By HBB at Ch: 1127-1564m GCHDP-WD-VZR-CHT-FATI-EX-18/25
|
GCCP-2
|
fatikchari
|
|
0.70
|
|
|
16.50
|
M/S. Goni Construction
|
15.67
|
|
|
|
0
|
|
|
|
|
175
|
GCHDP-WD-VZR-CHT-FATI -18/20
|
Paindang Karam Sikdar Road By HBB at Ch: 366.40-810m..GCHDP-WD-VZR-CHT-FATI-EX-18/25
|
GCCP-2
|
fatikchari
|
|
0.44
|
|
|
16.75
|
M/S. Goni Construction
|
15.90
|
|
|
|
0
|
|
|
|
|
176
|
GCHDP-WD-VZR-CHT-FATI-EX-18/26.
|
Alhaz Rafiqual Anower Road( Samitirhat) By HBB at Ch.00-1650m.
|
GCCP-2
|
fatikchari
|
|
0.44
|
|
|
62.00
|
|
0.00
|
|
|
|
0
|
|
|
|
|
177
|
GCHDP-WD-VZR-CHT-FATI-EX-18/27.
|
Anandapur to Badurkhil Road By HBB at Ch.00-2292m.
|
GCCP-2
|
fatikchari
|
|
1.65
|
|
|
98.00
|
|
0.00
|
|
|
|
0
|
|
|
|
|
178
|
GCHDP-WD-VZR-CHT-FATI-EX-18/28.
|
Bagan Bazar – Natun Tea-Garden Road By HBB.
|
GCCP-2
|
fatikchari
|
|
2.29
|
|
|
62.00
|
|
0.00
|
|
|
|
0
|
|
|
|
|
179
|
GCHDP-WD-VZR-CHT-FATI-EX-18/29.
|
Nazir Hat GC- Roshanggiri UP Road By BC.
|
GCCP-2
|
fatikchari
|
|
1.45
|
|
|
56.00
|
|
0.00
|
|
|
|
0
|
|
|
|
|
180
|
GCHDP-WD-FRB –CHT-HATH-MAIN -16/03
|
Rajamiah Chowdhury Road (Sarkarhat-Peshkarhat connecting Road) By Dense Carpeting at Ch. 00–4345m.
|
GCCP-2
|
hathazari
|
|
2.70
|
|
|
38.09
|
M/S. M N Alam Brothers
|
102.78
|
|
28/12/2016
|
30/06/2017
|
100
|
|
|
|
|
181
|
GCHDP-WD-VZR–CHT-HATH–MAIN-17/09
|
Kazi para Road By Dense Carpeting at Ch. 00-880m.
|
GCCP-2
|
hathazari
|
|
|
|
|
24.00
|
Mrs. Ifaque Traders
|
20.97
|
|
|
|
100
|
|
|
|
|
182
|
GCHDP-WD-VZR–CHT-HATH–MAIN-17/10
|
Agriculture Research Institute Road (Hathazari Pourashava) By RCC at Ch.965- 1127m
|
GCCP-2
|
hathazari
|
|
0.88
|
|
|
21.00
|
M/S. Iqbal Hossain
|
0.00
|
|
|
|
100
|
|
|
|
|
183
|
GCHDP-WD-VZR–CHT-HATH–MAIN-18/01
|
Raza-Miah Road (Chikondondi) Road By BC at Ch. 00–1110m.
|
GCCP-2
|
hathazari
|
|
|
|
|
25.58
|
M/S. Diya Enterprise
|
35.67
|
|
|
|
25
|
|
|
|
|
184
|
GCHDP-WD-VZR–CHT-HATH–MAIN-EX- -18/12
|
Maintenance of Ala Miah Road Burichar By RCC at Ch. 252-744m
|
GCCP-2
|
hathazari
|
|
1.11
|
|
|
34.50
|
M/S. Nafi Traders
|
47.15
|
|
|
|
0
|
|
|
|
|
185
|
GCHDP-WD-FRB-CHT-HATH –STR-18/01
|
Construction of 36.00m Long PC With RCC Girder Bridge on Mufti Foizulla Road over Porag Pali Khal at Ch.4000m.
|
GCCP-2
|
hathazari
|
|
|
|
|
0.00
|
M/S. Chowdhury Enterprise and Consonance Engineers & Builders (JV)
|
220.34
|
|
|
|
0
|
|
|
|
|
186
|
GCHDP-WD-UNR-CHT- HATH -16/01
|
Chand Gazi Road (Mekhel & Chipatoli Union) Road By BC Ch:970m-1750m.
|
GCCP-2
|
hathazari
|
|
|
|
|
0.00
|
M/S. Elius Enterprise
|
53.27
|
|
20/07/2017
|
27/01/2018
|
70
|
|
|
|
|
187
|
GCHDP-WD-UNR-CHT- HATH -16/03
|
Noor Ahmed Chyowdhury Road By BC Ch:2933m-3800m.
|
GCCP-2
|
hathazari
|
|
0.78
|
|
|
48.00
|
Mrs. Ifaque Traders
|
52.81
|
|
16/01/2017
|
23/07/2017
|
100
|
|
|
|
|
188
|
GCHDP-WD-UNR–CHT-HATH-17/05
|
Buripukur- Chipatoli Eidgha High School Road ( Hajee Yousf Road) By BC at Ch. 2508-3780m.
|
GCCP-2
|
hathazari
|
|
|
|
|
40.00
|
M/S. Haque & Brothers
|
47.71
|
|
|
|
80
|
|
|
|
|
189
|
GCHDP-WD-UNR–CHT-HATH-18/06
|
Nazirhat Katcha Bazar - Mirzapur UP Road (Badshahi Road) By HBB at Ch. 4950-6500m.
|
GCCP-2
|
hathazari
|
|
1.27
|
|
|
40.50
|
M/S. Amzad & Brothers
|
56.36
|
|
|
|
95
|
|
|
|
|
190
|
GCHDP-WD-VZR-CHT- HATH -16/03
|
Asraf Ali Chowdhury (Dhalai Union) Road By HBB Ch:860m-1340m.
|
GCCP-2
|
hathazari
|
|
|
|
|
0.00
|
Mrs. Ifaque Traders
|
16.88
|
|
19/12/2016
|
26/04/2017
|
100
|
|
|
|
|
191
|
GCHDP-WD-VZR-CHT-HATH -16/06
|
Katakhali Road (Gumanmordan) By HBB at Ch: 00m-925m
|
GCCP-2
|
hathazari
|
|
0.48
|
|
|
23.00
|
Mrs. S.R Enterprise
|
28.00
|
|
09/11/2016
|
16/04/2017
|
100
|
|
|
|
|
192
|
GCHDP-WD-VZR-CHT- HATH -16/07
|
Master Para Mudshuddi (Gumanmardan) Road By HBB Ch:534m-1800m.
|
GCCP-2
|
hathazari
|
|
0.93
|
|
|
25.00
|
Mrs. Elius Enterprise.
|
33.86
|
|
01/11/2016
|
07/03/2017
|
100
|
|
|
|
|
193
|
GCHDP-WD-VZR-CHT-HATH -16/08
|
Basua Dhala Road (Forhadabad Union) Road By HBB Ch:1230m-2150m.
|
GCCP-2
|
hathazari
|
|
1.27
|
|
|
25.00
|
M/S. Sharnali Enter.
|
23.82
|
|
22/12/2016
|
29/04/2017
|
100
|
|
|
|
|
194
|
GCHDP-WD-VZR-CHT-HATH-16/11
|
Kodal Bari Road (Gumanmordan) By BC at Ch: 113-116.5m,118.5-122.5m & 675-807m.
|
GCCP-2
|
hathazari
|
|
0.92
|
|
|
25.00
|
M/S Shahen Ahah Bricks Field.
|
12.83
|
|
06/11/2016
|
13/04/2017
|
100
|
|
|
|
|
195
|
GCHDP-WD-VZR-CHT- HATH -16/14
|
Abdul Barik (Chikondondi Union) Charar Kul Road By BC Ch: 00m-500m.
|
GCCP-2
|
hathazari
|
|
0.14
|
|
|
16.00
|
M/S. Ifaque Traders
|
28.64
|
|
16/01/2017
|
23/05/2017
|
100
|
|
|
|
|
196
|
GCHDP-WD-VZR-CHT- HATH -16/19
|
Yousfia (Forhadabad) Road By BC Ch:500m-1350m.
|
GCCP-2
|
hathazari
|
|
0.50
|
|
|
28.00
|
M/S. Sharnali Enterprise
|
36.34
|
|
22/12/2016
|
29/04/2017
|
90
|
|
|
|
|
197
|
GCHDP-WD-VZR-CHT- HATH -16/20
|
Mokbul Shah Road By HBB Ch: 00m-750m.
|
GCCP-2
|
hathazari
|
|
0.85
|
|
|
36.00
|
M/S. Shahen Shah Bricks Field
|
23.19
|
|
27/12/2016
|
03/05/2017
|
100
|
|
|
|
|
198
|
GCHDP-WD-VZR-CHT- HATH -16/21
|
Hazi Ismaile Munshi (North Madarsha Union) Road By HBB Ch: 00m-1000m.
|
GCCP-2
|
hathazari
|
|
0.75
|
|
|
25.00
|
M/S. Akhi International.
|
31.10
|
|
11/07/2016
|
18/01/2017
|
100
|
|
|
|
|
199
|
GCHDP-WD-VZR-CHT- HATH -17/21(01)
|
Hazi Ismaile Munshi (North Madarsha Union) Road By HBB Ch: 1000m-1180m.
|
GCCP-2
|
hathazari
|
|
1.00
|
|
|
25.00
|
M/S. Akhi International
|
5.49
|
|
11/10/2017
|
18/04/2018
|
100
|
|
|
|
|
200
|
GCHDP-WD-VZR-CHT-HATH -16/27
|
Jamshedia Road ( M. Madersha) By HBB at Ch: 00m-655m.
|
GCCP-2
|
hathazari
|
|
0.18
|
|
|
5.50
|
M/S. Akhi International
|
19.16
|
|
31/01/2017
|
07/07/2017
|
100
|
|
|
|
|
201
|
GCHDP-WD-VZR-CHT-FATI -16/30
|
Sona Miah Road (S. Madrasha) By HBB at Ch: 100m-850m
|
GCCP-2
|
hathazari
|
|
|
|
|
25.00
|
M/S. Akhi International
|
23.45
|
|
31/01/2017
|
07/07/2017
|
100
|
|
|
|
|
202
|
GCHDP-WD-VZR-CHT-FATI -16/34
|
B.R khan Road (Mekhal) By BC at Ch: 00m-827m
|
GCCP-2
|
hathazari
|
|
0.75
|
|
|
25.00
|
Mrs. Elius Enterprise.
|
31.52
|
|
01/11/2016
|
07/04/2017
|
100
|
|
|
|
|
203
|
GCHDP-WD-VZR-CHT- HATH -16/35
|
Asraf Ali Munshi Road (Gumanmardan Union) Road By HBB Ch: 00m-390m.
|
GCCP-2
|
hathazari
|
|
0.83
|
|
|
28.00
|
M/S.Sharnali Enterprise
|
8.65
|
|
06/11/2016
|
13/03/2017
|
100
|
|
|
|
|
204
|
GCHDP-WD-VZR-CHT- HATH -16/37
|
Joganath Road (Mirzapur Union) Road By HBB Ch:00m-1040m.
|
GCCP-2
|
hathazari
|
|
0.39
|
|
|
20.00
|
Mrs. Ifaque Traders
|
26.40
|
|
19/12/2016
|
26/04/2017
|
100
|
|
|
|
|
205
|
GCHDP-WD-VZR-CHT- HATH -16/52
|
Jamtola Kulal Para Road By BC Ch: 00m-1000m.
|
GCCP-2
|
hathazari
|
|
1.04
|
|
|
25.00
|
M/S. Shahen Shah Bricks Field
|
26.77
|
|
27/12/2016
|
03/05/2017
|
100
|
|
|
|
|
206
|
GCHDP-WD-VZR-CHT- HATH -18/32
|
Rashik Acharjee Road By RCC Ch: 10m-466m.
|
GCCP-2
|
hathazari
|
|
1.00
|
|
|
28.00
|
|
0.00
|
|
|
|
0
|
|
|
|
|
207
|
GCHDP-WD-VZR-CHT- HATH -17/24
|
Mohammadpur Road By BC at Ch. 142-690m.
|
GCCP-2
|
hathazari
|
|
0.43
|
|
|
24.97
|
M/S Hossain & Brothers
|
34.53
|
|
04/10/2017
|
11/04/2018
|
70
|
|
|
|
|
208
|
GCHDP-WD-VZR-CHT- HATH -17/44
|
Lokmania Rd.(Mekhal Union) Road By HBB Ch: 00m-700m.
|
GCCP-2
|
hathazari
|
|
0.55
|
|
|
36.00
|
M/S. Shahen Shah Bricks Field
|
22.22
|
|
|
|
100
|
|
|
|
|
209
|
GCHDP-WD-VZR-CHT- HATH -17/48
|
Bachamia Sowdagor Road (N.Madrasa) By HBB Ch: 100m-610m.
|
GCCP-2
|
hathazari
|
|
|
|
|
25.00
|
M/S. Yakub & Brothers
|
20.61
|
|
|
|
90
|
|
|
|
|
210
|
GCHDP-WD-VZR-CHT-HATH-17/23
|
B.A. Sultan Bari Road By HBB at Ch. 00-2000m.
|
GCCP-2
|
hathazari
|
|
|
|
|
25.00
|
M/S. Haque & Brothers
|
69.69
|
|
|
|
50
|
|
|
|
|
211
|
GCHDP-WD-VZR-CHT- HATH-18/04
|
Asraf Ali Munshi Road (Mirzapur) By HBB at Ch.1345-2045m
|
GCCP-2
|
hathazari
|
|
2.00
|
|
|
25.00
|
M/S. Haque & Brothers
|
24.80
|
|
|
|
0
|
|
|
|
|
212
|
GCHDP-WD-VZR-CHT-HATH -17/12
|
Middle Madarsha Link Road (South Madrasha) By BC at Ch.1880-2550m.
|
GCCP-2
|
hathazari
|
|
|
|
|
25.00
|
M/S. N. B. Corporation
|
22.37
|
|
|
|
0
|
|
|
|
|
213
|
GCHDP-WD-VZR-CHT-HATH–STR-18/12
|
Construction of 32.00m Long PC Girder Bridge on Middle Madrasha Link Road Over Madari Khal at Ch.1750m.
|
GCCP-2
|
hathazari
|
|
0.67
|
|
|
0.00
|
M/S. Chowdhury Enterprise and Consonance Engineers & Builders (JV)
|
225.27
|
|
|
|
50
|
|
|
|
|
214
|
GCHDP-WD-VZR-CHT-HATH -18/15
|
Zobra Fatepur Road. (Fate pur) By HBB at Ch. 924-1025m & 1062-1715m.
|
GCCP-2
|
hathazari
|
|
|
|
|
228.93
|
M/S. Haque & Brothers
|
30.74
|
|
|
|
0
|
|
|
|
|
215
|
GCHDP-WD-VZR-CHT- HATH-18/36
|
Momen Shah Road Mirjapur By HBB at Ch.00-750m.
|
GCCP-2
|
hathazari
|
|
0.75
|
|
|
25.00
|
M/S. T.L Trading
|
27.73
|
|
|
|
0
|
|
|
|
|
216
|
GCHDP-WD-VZR-CHT-HATH -18/42
|
Nur ullah chowdhry Road (Dhalai) By BC at Ch. 00-1360m..
|
GCCP-2
|
hathazari
|
|
0.75
|
|
|
25.00
|
|
0.00
|
|
|
|
0
|
|
|
|
|
217
|
GCHDP-WD-VZR–CHT-HATH-18/17
|
Fazu Meah (Dhali) Road By BC at Ch. 00-610m.
|
GCCP-2
|
hathazari
|
|
|
|
|
25.00
|
|
0.00
|
|
|
|
0
|
|
|
|
|
218
|
GCHDP-WD-VZR-CHT-HATH -17/18
|
Solaiman Chowdhury Road By HBB at Ch.00-550m.
|
GCCP-2
|
hathazari
|
|
0.61
|
|
|
39.37
|
M/S. N. B. Corporation
|
23.82
|
|
|
|
0
|
|
|
|
|
219
|
GCHDP-WD-VZR-CHT-HATH –18/02
|
Hajee Safar Ali (Mirjapur) Road By BC at Ch.2220-2870m.
|
GCCP-2
|
hathazari
|
|
|
|
|
25.00
|
M/S. N. B. Corporation
|
38.85
|
|
|
|
0
|
|
|
|
|
220
|
GCHDP-WD-VZR–CHT-HATH-18/28
|
Baitu Sharaf Adrasha Madrasha Road (Mirzapur) Road By HBB at Ch. 00-730m.
|
GCCP-2
|
hathazari
|
|
|
|
|
25.00
|
M/S. Nafi Traders
|
27.98
|
|
|
|
0
|
|
|
|
|
221
|
GCHDP-WD-VZR–CHT-HATH-18/41
|
Kazipara Road – Bongshal Road ( Shil Rejeswari Road) By BC at Ch. 00-1475m.
|
GCCP-2
|
hathazari
|
|
0.73
|
|
|
25.00
|
M/S. Alif Enterprise
|
91.16
|
|
|
|
0
|
|
|
|
|
222
|
GCHDP-WD-VZR-CHT- HATH-18/22
|
Kazi para Road (Mirjapur) Road By HBB at Ch.218-256m & 317-1145m.
|
GCCP-2
|
hathazari
|
|
|
|
|
28.00
|
M/S. Belal Builders
|
35.90
|
|
|
|
0
|
|
|
|
|
223
|
GCHDP-WD-VZR-CHT- HATH-EX-17/56
|
Construction of 2X4.5mX 4.5m RCC Box Culvert on University Teachers Multi Co-Operative Society Road at Ch.40m.
|
GCCP-2
|
hathazari
|
|
|
|
|
25.00
|
M/S. M.N. Alam Brothers
|
19.66
|
|
|
|
100
|
|
|
|
|
224
|
GCHDP-WD-VZR-CHT- HATH-EX-18/57
|
Baker Beel Mandakini (Forhadabad ) Road BC at Ch.920-1420m.
|
GCCP-2
|
hathazari
|
|
|
|
|
21.85
|
M/S. L. T Trading
|
34.47
|
|
|
|
0
|
|
|
|
|
225
|
GCHDP-WD-VZR-CHT- HATH-EX-18/58
|
Moulana Abdul Karim Road By BC at Ch: 00-200m & 240-320m
|
GCCP-2
|
hathazari
|
|
0.50
|
|
|
36.29
|
|
0.00
|
|
|
|
0
|
|
|
|
|
226
|
GCHDP-WD-VZR-CHT- HATH-EX-18/59
|
|
GCCP-2
|
hathazari
|
|
0.26
|
|
|
21.69
|
|
0.00
|
|
|
|
0
|
|
|
|
|
227
|
GCHDP-WD-FRB-LOHA -MAIN-16/01
|
Kalauzan Feeder Road By Dense Carpeting at Ch. Ch.00m-3400m
|
GCCP-2
|
lohagara
|
|
|
|
|
0.00
|
M/S.Friends Traders
|
58.80
|
|
19/04/2016
|
26/08/2016
|
100
|
|
|
|
|
228
|
GCHDP-WD-UNR-LOHA -MAIN-16/01
|
Shah Peer Road By Dense Carpeting at Ch. 2200–2768m.
|
GCCP-2
|
lohagara
|
|
3.40
|
|
|
67.00
|
M/S. Md. Faruq
|
24.94
|
|
18/07/2016
|
25/11/2016
|
100
|
|
|
|
|
229
|
GCHDP-WD-VZR–CHT-LOHA –MAIN-16/02
|
Jangle Padua Road By Dense Carpeting at Ch. 00–1500m.
|
GCCP-2
|
lohagara
|
|
0.57
|
|
|
27.00
|
M. Rahman Traders
|
45.78
|
|
23/01/2017
|
30/05/2017
|
100
|
|
|
|
|
230
|
GCHDP-WD-VZR–CHT-LOHA –MAIN-16/01
|
Adhunagar Rajghata RoadBy Dense Carpeting at Ch. 00–1000m.
|
GCCP-2
|
lohagara
|
|
1.50
|
|
|
34.00
|
M. Rahman Traders
|
24.73
|
|
08/05/2016
|
22/05/2016
|
100
|
|
|
|
|
231
|
GCHDP-WD-UNR-CHT-LOHA-16/01
|
Amirabad UP to Kalauzan UP Road By BC at Ch: 3836m-4295m.
|
GCCP-2
|
lohagara
|
|
|
|
|
0.00
|
M/S.Kashem Brothers.
|
25.92
|
|
06/06/2016
|
13/10/2016
|
100
|
|
|
|
|
232
|
GCHDP-WD-UNR–CHT-LOHA-17/02
|
Lohardeghi & RHD Adhunagar Khan Hat GC (Adhunagar Aktaria Madrasa) Road By BC at Ch. 00-620m.
|
GCCP-2
|
lohagara
|
|
0.46
|
|
|
28.00
|
M/S.Nissan Traders
|
36.37
|
|
|
|
80
|
|
|
|
|
233
|
GCHDP-WD-CHT-LOHA -GC-17/02
|
Sener Hat Bazar / Growth Center.
|
GCCP-2
|
lohagara
|
|
0.62
|
|
|
33.00
|
Mr. U. T. Mong
|
41.12
|
|
04/10/2017
|
11/04/2018
|
100
|
|
|
|
|
234
|
GCHDP-WD-CHT-LOHA -GC-17/01
|
Kanuram Bazar / Growth Center
|
GCCP-2
|
lohagara
|
|
|
|
|
50.00
|
M/S. Nazrul Construction
|
46.26
|
|
|
|
80
|
|
|
|
|
235
|
GCHDP-WD-VZR-CHT-LOHAGARA -16/01
|
Chunati Rosainga Ghona Forest Office Haper Ghata Road (Ch: 00m-3000m)
|
GCCP-2
|
lohagara
|
|
|
|
|
0.00
|
M/S. Nipa Enterprise
|
102.88
|
|
15/03/2016
|
22/07/2016
|
100
|
|
|
|
|
236
|
GCHDP-WD-VZR-CHT-LOHAGARA -16/01(01)
|
Chunati Rosainga Ghona Forest Office Haper Ghata Road By HBB at Ch: 3000m-4650m)
|
GCCP-2
|
lohagara
|
|
3.00
|
|
|
120.58
|
M/S. Md. Faruq
|
45.12
|
|
12/09/2017
|
19/02/2018
|
100
|
|
|
|
|
237
|
GCHDP-WD-VZR-CHT-LOHA -16/04
|
Adhunagar Harina Road By BC at Ch: 00-1320m.
|
GCCP-2
|
lohagara
|
|
1.65
|
|
|
50.12
|
M/S Milton Traders
|
106.56
|
|
24/05/2017
|
30/11/2017
|
100
|
|
|
|
|
238
|
GCHDP-WD-VZR-CHT-LOHA -16/08
|
Lohagara Lohar Dighi Connecting road (Ch: 500m-900m)
|
GCCP-2
|
lohagara
|
|
1.32
|
|
|
28.00
|
M/S.M Rahman Traders
|
12.54
|
|
16/05/2016
|
23/09/2016
|
100
|
|
|
|
|
239
|
GCHDP-WD-VZR –CHT-LOHA-16/09
|
Amirabad Kamar Dighi Road By BC at Ch: 1108-1852m.
|
GCCP-2
|
lohagara
|
|
0.40
|
|
|
13.00
|
M. Rahman Traders
|
39.00
|
|
24/05/2017
|
10/10/2017
|
100
|
|
|
|
|
240
|
GCHDP-WD-VZR –CHT-LOHA-18/09(01)
|
Construction of 2-Vent 3.00mX3.00m RCC Box Culvert on Amirabad Kamar Dighi Road at Ch.1447m.
|
GCCP-2
|
lohagara
|
|
0.74
|
|
|
40.00
|
M/S. Saired Enterprise
|
16.81
|
|
|
|
0
|
|
|
|
|
241
|
GCHDP-WD-VZR-CHT-LOHA -16/11
|
Darbesh hat Maijbilla Road By HBB at Ch: 3500m-4000m.
|
GCCP-2
|
lohagara
|
|
|
|
|
17.70
|
M/S.Alam Enterprise
|
15.67
|
|
29/05/2016
|
05/10/2016
|
100
|
|
|
|
|
242
|
GCHDP-WD-VZR-CHT-LOHA -16/14
|
Kanuram Bazar Harina road (Ch. 962m-1362m)
|
GCCP-2
|
lohagara
|
|
0.50
|
|
|
16.00
|
M/S.Dipu Kanti Paul
|
12.42
|
|
05/06/2016
|
12/10/2016
|
100
|
|
|
|
|
243
|
GCHDP-WD-VZR-CHT-LOHA -16/19
|
Barahatia Harider Ghona Dakkin Para Jan Basu Bari Road By HBB at Ch: 00m-500m
|
GCCP-2
|
lohagara
|
|
0.40
|
|
|
13.00
|
M/S. Md. Faruq
|
14.28
|
|
18/07/2016
|
25/11/2016
|
100
|
|
|
|
|
244
|
GCHDP-WD-VZR-CHT-LOHA -16/22
|
Putivila Boddho Mondir Road (Ch. 00 to 500m)
|
GCCP-2
|
lohagara
|
|
0.50
|
|
|
16.00
|
M/S.Kabir Ahmed
|
15.57
|
|
18/05/2016
|
25/09/2016
|
100
|
|
|
|
|
245
|
GCHDP-WD-VZR-CHT-LOHA -16/24
|
Padua Hari Mandir Road By HBB at Ch. 2430 to 2730m.
|
GCCP-2
|
lohagara
|
|
0.50
|
|
|
16.00
|
M/S.Dipu Kanti Paul
|
9.31
|
|
05/06/2016
|
12/10/2016
|
100
|
|
|
|
|
246
|
GCHDP-WD-VZR –CHT-LOHA-MAIN -16/01
|
Adhunagar Rajghata Road
|
GCCP-2
|
lohagara
|
|
0.30
|
|
|
10.00
|
M/S.M Rahman Traders
|
24.73
|
|
22/05/2016
|
29/09/2016
|
100
|
|
|
|
|
247
|
GCHDP-WD-VZR-CHT-LOHA-STR -16/02
|
Construction of 27.00m Long RCC Girder Bridge Over Ratar Chara on Chunti Khairati Road at Ch: 1500m.
|
GCCP-2
|
lohagara
|
|
1.00
|
|
|
23.00
|
M/S.Milton Traders
|
101.70
|
|
30/06/2016
|
07/07/2017
|
100
|
|
|
|
|
248
|
GCHDP-WD-VZR –CHT-LOHA- STR-16/21
|
Construction of 4X4.50mX4.50m RCC Box Culvert on Shah Peer Road near Bhabanipur connecting Road over Thomthomkia Khal Road at Ch. 220m.
|
GCCP-2
|
lohagara
|
|
|
|
|
120.24
|
M/S. H.K.C Enterprise
|
39.44
|
|
06/07/2017
|
13/12/2017
|
100
|
|
|
|
|
249
|
GCHDP-WD-VZR –CHT-LOHA-16/12
|
Chunati Theker Dokan to Hadur Pahar Road By HBB at Ch: 170-572m.
|
GCCP-2
|
lohagara
|
|
|
|
|
43.82
|
M/S.Dipu Kanti Paul
|
11.63
|
|
07/06/2017
|
24/10/2017
|
100
|
|
|
|
|
250
|
GCHDP-WD-VZR –CHT-LOHA-16/06
|
Chunati Moulana para Sayer Fakir Ghona Road By HBB at Ch: 00-490m.
|
GCCP-2
|
lohagara
|
|
0.40
|
|
|
13.00
|
M/S. Dipu Kanti Paul.
|
11.63
|
|
|
|
100
|
|
|
|
|
251
|
GCHDP-WD-VZR–CHT-LOHA-17/10
|
Lohagara Sarkar Para Road By BC at Ch. 00-460m.
|
GCCP-2
|
lohagara
|
|
0.49
|
|
|
13.00
|
Kabir Ahmed
|
27.19
|
|
|
|
70
|
|
|
|
|
252
|
GCHDP-WD-VZR–CHT-LOHA-17/07
|
Barahatia Ghonar Mour Road By HBB at Ch. 00-347m.
|
GCCP-2
|
lohagara
|
|
0.46
|
|
|
22.00
|
M/S. Shah Jabbaria Construction & Co.
|
11.70
|
|
|
|
100
|
|
|
|
|
253
|
GCHDP-WD-VZR–CHT-LOHA-17/15
|
Chunati Shah Sufi GPS-Banshkhali Connecting Road By HBB at Ch. 635-954m.
|
GCCP-2
|
lohagara
|
|
0.35
|
|
|
13.00
|
M/S. Alam Enterprise
|
11.68
|
|
|
|
100
|
|
|
|
|
254
|
GCHDP-WD-VZR –CHT-LOHA-17/03
|
Boro Hatia Esataul Ulom Road By BC at CH.90-610m.
|
GCCP-2
|
lohagara
|
|
0.32
|
|
|
13.00
|
M Raraman Trades
|
27.01
|
|
12/09/2017
|
19/02/2018
|
100
|
|
|
|
|
255
|
GCHDP-WD-VZR-CHT-LOHA -17/16
|
Kalauzan AdharChar Road By HBB at Ch.00-375m.
|
GCCP-2
|
lohagara
|
|
0.52
|
|
|
29.09
|
Kabir Ahmed
|
12.07
|
|
|
|
0
|
|
|
|
|
256
|
GCHDP-WD-VZR-CHT-LOHA -17/18
|
Lohagara Rashider Para Road By BC at Ch.00-240m.
|
GCCP-2
|
lohagara
|
|
0.38
|
|
|
13.41
|
M/S. Alam Enterprise
|
15.77
|
|
|
|
0
|
|
|
|
|
257
|
GCHDP-WD-VZR-CHT-LOHA -17/23
|
Uzirvita Goda para Road By HBB at Ch.00-280m.
|
GCCP-2
|
lohagara
|
|
0.24
|
|
|
16.32
|
Hasina Construction
|
9.06
|
|
|
|
100
|
|
|
|
|
258
|
GCHDP-WD-VZR-CHT-LOHA -17/20
|
Bamirnala to Hajee Golambari High School Road By HBB at Ch.00-355m.
|
GCCP-2
|
lohagara
|
|
0.28
|
|
|
10.06
|
M/S. Alam Enterprise
|
12.06
|
|
|
|
20
|
|
|
|
|
259
|
GCHDP-WD-VZR-CHT-LOHA -17/25
|
Kalauzan Khatibiya Road By HBB at Ch.56-143m & 550-618m.
|
GCCP-2
|
lohagara
|
|
0.36
|
|
|
13.40
|
Kabir Ahmed
|
9.04
|
|
|
|
0
|
|
|
|
|
260
|
GCHDP-WD-VZR-CHT-LOHA -17/13
|
Purba Kalauzan Adarchar Road By HBB at Ch.00-281m.
|
GCCP-2
|
lohagara
|
|
0.16
|
|
|
10.05
|
Kabir Ahmed
|
9.05
|
|
|
|
20
|
|
|
|
|
261
|
GCHDP-WD-VZR-CHT-LOHA-EX-17/26
|
Islam Darogar Ghona – Haper Gath ( Start From Chandan Kata ) Road By HBB at Ch. 00-2100m.
|
GCCP-2
|
lohagara
|
|
0.28
|
|
|
10.05
|
M/S. Quashem Construction
|
177.40
|
|
|
|
95
|
|
|
|
|
262
|
GCHDP-WD-FRB-MIRS -MAIN-16/01
|
Zorar Gonj Borburia Ghat Road By Dense Carpeting at Ch. 5100–5800m.
|
GCCP-2
|
mirsharai
|
|
|
|
|
0.00
|
M/S well Enterprise
|
10.59
|
|
31/10/2016
|
07/03/2017
|
100
|
|
|
|
|
263
|
GCHDP-WD-UNR–CHT-MIRS–MAIN-16/01
|
Mogadia UP to Bari Bundha R&H via Thakur Hat Mozumderhat & Bangla Bazar (Abotorab-Hashem Nagar-Char sarat Road) Road By Dense Carpeting at Ch. 1750–3100m.
|
GCCP-2
|
mirsharai
|
|
|
|
|
55.00
|
M/S. Akif Enterprise
|
33.26
|
|
10/01/2017
|
17/05/2017
|
100
|
|
|
|
|
264
|
GCHDP-WD-VZR–CHT-MIRS–MAIN-17/16
|
Abdul Wahab – Dorgapara Mazar Road By Dense Carpeting at Ch. 325-1650m.
|
GCCP-2
|
mirsharai
|
|
1.35
|
|
|
37.00
|
M/S . Mirsharai Enterprise
|
28.31
|
|
06/07/2017
|
13/10/2017
|
100
|
|
|
|
|
265
|
GCHDP-WD-VZR–CHT-PATI –MAIN-17/09
|
Sub -Register Bari Via Motaherul Islam Chowdury Bakhali Barua para Road By Seal Coat at Ch. 550-1500m.
|
GCCP-2
|
mirsharai
|
|
1.33
|
|
|
30.02
|
|
0.00
|
|
|
|
0
|
|
|
|
|
266
|
GCHDP-WD-VZR–CHT-PATI –MAIN-17/11
|
Dhawardenga Kaliaish Banga Maji Road By Dense Carpeting at Ch. 00-1500m.
|
GCCP-2
|
mirsharai
|
|
0.95
|
|
|
10.63
|
|
0.00
|
|
|
|
0
|
|
|
|
|
267
|
GCHDP-WD-VZR–CHT-MIRS–MAIN-17/03
|
Choto Kamaldaha Patharia road By Dense Carpeting at Ch. 00-1400m.
|
GCCP-2
|
mirsharai
|
|
1.50
|
|
|
29.52
|
M/S. Hoq Traders
|
26.32
|
|
30/07/2017
|
06/10/2017
|
100
|
|
|
|
|
268
|
GCHDP-WD-VZR–CHT-MIRS–MAIN-17/21
|
Chinki Astana station Road (RHD to Hill) By Dense Carpeting at Ch. 00-850m.
|
GCCP-2
|
mirsharai
|
|
1.40
|
|
|
27.99
|
|
0.00
|
|
|
|
0
|
|
|
|
|
269
|
GCHDP-WD-VZR–CHT-MIRS–MAIN-18/20
|
Usha Gazi road By Dende Carpeting.at ch.00-1290m
|
GCCP-2
|
mirsharai
|
|
|
|
|
21.00
|
|
0.00
|
|
|
|
0
|
|
|
|
|
270
|
GCHDP-WD-VZR–CHT-MIRS–MAIN-18/17
|
Maintenance of Shaheed Zakir Hossain Road Koila By Dense Carpeting at Ch.00-1000m.
|
GCCP-2
|
mirsharai
|
|
1.29
|
|
|
21.00
|
|
0.00
|
|
|
|
0
|
|
|
|
|
271
|
GCHDP-WD-FRB-CHT-MIRS -16/01
|
Abur Hat GC- Bamon Sundar Darogar Hat GC Road By BC at Ch: 700m-3850m.
|
GCCP-2
|
mirsharai
|
|
|
|
|
0.00
|
Techbay International
|
244.74
|
|
05/06/2016
|
12/06/2017
|
35
|
|
|
|
|
272
|
GCHDP-WD-FRB-CHT-MIRS -16/02
|
Karer Hat UP to Santirhat GC Road By BC at Ch. 3780-6525m.
|
GCCP-2
|
mirsharai
|
|
3.15
|
|
|
270.00
|
M/S. Aradhana Enterprise
|
193.58
|
|
03/01/2017
|
10/09/2017
|
50
|
|
|
|
|
273
|
GCHDP-WD-FRB-CHT-MIRS-17/10
|
Bamansunder –Darogar Hat GC- Abur Hat GC Road Via Joulanpool Bazar ( Bamansunder-Bariayakhali-joulanpool Road & joulanpool-Abur Hat Road) road By BC at Ch. 1780-2480m.
|
GCCP-2
|
mirsharai
|
|
2.75
|
|
|
194.00
|
M/S. Onik Traders
|
61.23
|
|
|
|
30
|
|
|
|
|
274
|
GCHDP-WD-UZR-CHT-MIRS -EX-18/03
|
Bamansundar- Darogar Hat GC – Abur Hat GC Road via Joulanpool Bazar (Bamansundar-Bariayakhali- Joulanpool Road & Joulanpool- Abu Hat Road ) Road By BC at Ch.5870-7200m.
|
GCCP-2
|
mirsharai
|
|
0.70
|
|
|
56.49
|
M/S. Onik Traders
|
97.07
|
|
|
|
10
|
|
|
|
|
275
|
GCHDP-WD-UNR-CHT-MIRS -16/01
|
Gazaria-Haidkandi U.P Road (Oli Ahamed Abdur Rahman(Part-2) By BC at Ch.1400-2500m
|
GCCP-2
|
mirsharai
|
|
|
|
|
0.00
|
M/S. Hoque Traders
|
58.89
|
|
20/12/2016
|
27/06/2017
|
100
|
|
|
|
|
276
|
GCHDP-WD-UNR-CHT-MIRS -16/03
|
Gash Baria Shaher khali Hospital Road via Bhuiyar Hat Road By BC at Ch: 1250m-2250m.
|
GCCP-2
|
mirsharai
|
|
0.98
|
|
|
56.00
|
M/S. Arafat Steel & Engineering
|
56.98
|
|
21/03/2017
|
29/09/2017
|
100
|
|
|
|
|
277
|
GCHDP-WD-UNR-CHT-MIRS -16/09
|
Ludha Khali Sahaji Bazar Bamonsunder Daroger Hat Road (Bamonsunder Daroger Hat GC to Bari Bundh R & H Road via Luddakhali) By BC at Ch:3016-4046 m
|
GCCP-2
|
mirsharai
|
|
1.00
|
|
|
56.00
|
M/S. Well Enterprise
|
57.88
|
|
08/01/2017
|
15/07/2017
|
100
|
|
|
|
|
278
|
GCHDP-WD-UNR-CHT-MIRS -17/02
|
Mayani UP- Annenderhat Bazar Road via Maddam Mayani (Abutorab Anander hat ) Road By BC at Ch. 750-1120m
|
GCCP-2
|
mirsharai
|
|
1.03
|
|
|
56.00
|
M/S.N.M Enterprise
|
27.85
|
|
03/10/2017
|
|
100
|
|
|
|
|
279
|
GCHDP-WD-UNR-CHT-MIRS-STR-17/06
|
Construction of 20.00m Long RCC Girder Bridge on Moghadia UP- Bari Bundth R & H Via Thakur Hat Mozumdarhat & Banglabazar (Abutorab-Hashem Nagar-Char sarat Road) at Ch. 4250m.
|
GCCP-2
|
mirsharai
|
|
0.37
|
|
|
28.00
|
M/S.R A Enterprise.
|
119.88
|
|
09/08/2017
|
16/08/2018
|
0
|
|
|
|
|
280
|
GCHDP-WD-UNR-CHT-MIRS -17/06
|
Moghadia UP- Bari Bundth R & H Via Thakur Hat Mozumdarhat & Banglabazar (Abutorab-Hashem Nagar-Char sarat Road) By BC at Ch. 7800-8500m.
|
GCCP-2
|
mirsharai
|
|
|
|
|
141.68
|
M/S. Mirsharai Enterprise
|
44.32
|
|
|
|
65
|
|
|
|
|
281
|
GCHDP-WD-UNR-CHT-MIRS-17/10
|
Bamansunder –Darogar Hat GC- Abur Hat GC Road Via Joulanpool Bazar ( Bamansunder-Bariayakhali-joulanpool Road & joulanpool-Abur Hat Road) road By BC at Ch. 1780-2480m.
|
GCCP-2
|
mirsharai
|
|
0.80
|
|
|
45.19
|
|
0.00
|
|
|
|
10
|
|
|
|
|
282
|
GCHDP-WD-UNR-CHT-MIRS -17/08
|
Osmanpur UP-Muhuri Gate Bazar Road( Jahabox-Banshkhali-Muhuri Gate Bazar Road) By BC at CH.900-1625m.
|
GCCP-2
|
mirsharai
|
|
0.70
|
|
|
56.49
|
M/S. Arafat Steel & Engineering
|
44.96
|
|
|
|
65
|
|
|
|
|
283
|
GCHDP-WD-VZR-CHT-MIRS -16/14
|
Mohalanka Baliadi Road By BC at Ch: 2040m-3040m.
|
GCCP-2
|
mirsharai
|
|
|
|
|
0.00
|
M/S. Haque Traders
|
53.88
|
|
10/08/2016
|
17/02/2017
|
100
|
|
|
|
|
284
|
GCHDP-WD-VZR-CHT-MIRS -16/38
|
Kazir hat- Rammondol Road (Station Road) By BC at Ch.00-1200m
|
GCCP-2
|
mirsharai
|
|
1.00
|
|
|
56.00
|
M/S. R.A Enterprise
|
52.85
|
|
27/12/2016
|
30/06/2017
|
100
|
|
|
|
|
285
|
GCHDP-WD-VZR-CHT-MIRS -18/58
|
Kazirtaluk – Tingoria tola GPS Road (Moazzem Fakir Road) By BC at Ch.00-750m.
|
GCCP-2
|
mirsharai
|
|
1.20
|
|
|
53.00
|
M/S. Dulal & Sons
|
51.02
|
|
|
|
0
|
|
|
|
|
286
|
GCHDP-WD-VZR-CHT-MIRS -16/06
|
Yusuf Ali Road By BC at Ch: 00m-1500m.
|
GCCP-2
|
mirsharai
|
|
0.75
|
|
|
53.71
|
M/S Akter Enterprise.
|
83.45
|
|
20/09/2006
|
27/05/2017
|
100
|
|
|
|
|
287
|
GCHDP-WD-VZR-CHT-MIRS -16/63
|
Hazi Abdul Hoque Road By HBB at Ch. 00-690m.
|
GCCP-2
|
mirsharai
|
|
1.50
|
|
|
84.00
|
M/S Dulal & Sons.
|
22.14
|
|
13/11/2016
|
20/03/2017
|
100
|
|
|
|
|
288
|
GCHDP-WD-VZR-CHT-MIRS -16/23
|
Hadi Musa Road By BC at Ch. 00-1000m.
|
GCCP-2
|
mirsharai
|
|
0.69
|
|
|
23.00
|
M/S. Akter Enterprise
|
50.91
|
|
31/10/2016
|
07/05/2017
|
60
|
|
|
|
|
289
|
GCHDP-WD-VZR-CHT-MIRS -16/26
|
Joy Nagar (Aburhat-Bishu Miah Road) Road By BC at Ch. 00-1060m.
|
GCCP-2
|
mirsharai
|
|
1.00
|
|
|
56.00
|
M/S. Jonaet Enterprise
|
54.35
|
|
22/06/2017
|
29/12/2017
|
100
|
|
|
|
|
290
|
GCHDP-WD-VZR-CHT-MIRS -17/20
|
Shaheed Shakendar Ali Road By BC at Ch: 700-1500m
|
GCCP-2
|
mirsharai
|
|
1.06
|
|
|
56.00
|
M/S.Well Enterprise
|
54.63
|
|
04/07/2017
|
|
60
|
|
|
|
|
291
|
GCHDP-WD-VZR-CHT-MIRS -17/07
|
Union Eastern circular Road By BC at Ch: 1425-2350m.
|
GCCP-2
|
mirsharai
|
|
0.80
|
|
|
56.00
|
M/S Mirsharai Enterprise
|
58.72
|
|
|
|
100
|
|
|
|
|
292
|
GCHDP-WD-VZR-CHT-MIRS -17/55
|
Shahid Sirajul Hoque Road By HBB at Ch: 00-850m.
|
GCCP-2
|
mirsharai
|
|
0.93
|
|
|
56.48
|
M/S. Dulal & Sons
|
35.83
|
|
|
|
100
|
|
|
|
|
293
|
GCHDP-WD-VZR-CHT-MIRS -17/05
|
Zorargonj Project Road-Shahebpur Road (Kamar Ali chowdhury) By BC at Ch: 00-620m.
|
GCCP-2
|
mirsharai
|
|
0.85
|
|
|
33.49
|
M/S. Arafat Steel & Engineering
|
39.35
|
|
|
|
100
|
|
|
|
|
294
|
GCHDP-WD-VZR-CHT-MIRS-STR-17/67 65
|
Construction of 81.00m Long PC Girder Bridge on Asad Ali Kari Road over Ichakhali khal at Ch. 2000m.
|
GCCP-2
|
mirsharai
|
|
0.62
|
|
|
39.55
|
AR-ALML JV
|
402.17
|
|
|
|
40
|
|
|
|
|
295
|
GCHDP-WD-VZR-CHT-MIRS-STR-17/67
|
Construction of 32.00m Long PC Girder Bridge on Hinguli Central Road ( Khil Hinguli School Road ) at Ch. 1500m.
|
GCCP-2
|
mirsharai
|
|
|
|
|
430.12
|
M/S. Chowdhury Enterprise & The Trade Link JV.
|
194.62
|
|
|
|
80
|
|
|
|
|
296
|
GCHDP-WD-VZR-CHT-MIRS-STR-17/66
|
Construction of 20.00m Long RCC Girder Bridge on Moulovi Badiul Alam road ( Purbo Dom Khali School Road ) at Ch. 10m.
|
GCCP-2
|
mirsharai
|
|
|
|
|
209.20
|
Consonance Eingineers & Builders
|
162.23
|
|
|
|
100
|
|
|
|
|
297
|
GCHDP-WD-VZR-CHT-MIRS-STR-17/31
|
Construction of 75.00m Long PC Girder Bridge on Kaila Shaheed Jakir Hossan Road at Ch. 4070m.
|
GCCP-2
|
mirsharai
|
|
|
|
|
180.26
|
M/S. Chowdhury Enterprise & The Trade Link JV.
|
347.66
|
|
|
|
50
|
|
|
|
|
298
|
GCHDP-WD-VZR-CHT-MIRS-17/64
|
Hazi Sultan Ahamed Road (Darogarhat-Sattar Bhuyan Hat RD Bamonsundar) Road By BC at Ch. 00-460m.
|
GCCP-2
|
mirsharai
|
|
|
|
|
354.29
|
M/S. Ahan
Enterprise
|
28.09
|
|
|
|
100
|
|
|
|
|
299
|
GCHDP-WD-VZR-CHT-MIRS -17/22
|
Kachua Toshi Monshi Road By BC at CH.00-600m.
|
GCCP-2
|
mirsharai
|
|
0.46
|
|
|
28.24
|
M/S. Akif Enterprise
|
38.12
|
|
|
|
70
|
|
|
|
|
300
|
GCHDP-WD-VZR-CHT-MIRS -17/09
|
Khirodia Gonga Ram Road By BC at CH.00-850m.
|
GCCP-2
|
mirsharai
|
|
0.60
|
|
|
39.10
|
M/S. Akif Enterprise
|
55.43
|
|
|
|
100
|
|
|
|
|
301
|
GCHDP-WD-VZR-CHT-MIRS -17/13
|
Mokrem Ali Kala Gazi Anandarhat (Mokrem Ali Bridge-Bishu Miah Road ) Road By BC at CH.00-600m.
|
GCCP-2
|
mirsharai
|
|
0.85
|
|
|
56.00
|
M/S. Onik Traders
|
39.03
|
|
|
|
65
|
|
|
|
|
302
|
GCHDP-WD-VZR-CHT-MIRS -17/03
|
Union Central Road UP-3 (Bancharampur Road ) Road By BC at CH.00-600m.
|
GCCP-2
|
mirsharai
|
|
0.60
|
|
|
39.09
|
M/S. Arafat Steel & Engineering
|
0.00
|
|
|
|
65
|
|
|
|
|
303
|
GCHDP-WD-VZR-CHT-MIRS -17/48
|
Hadi Fakir Hat GC R&H – Bhuiya Para GPS (Baki Road ) Road By BC at CH.00-950m.
|
GCCP-2
|
mirsharai
|
|
0.60
|
|
|
39.81
|
M/S. R. A Enterprise
|
61.95
|
|
|
|
0
|
|
|
|
|
304
|
GCHDP-WD-VZR-CHT-MIRS -18/43
|
Takia Road (upto Khal) Road By BC at Ch.00-590m.
|
GCCP-2
|
mirsharai
|
|
|
|
|
39.50
|
|
0.00
|
|
|
|
0
|
|
|
|
|
305
|
GCHDP-WD-VZR-CHT-MIRS -18/33
|
Sheikh Bahar ullah road (Ganakchara Dhumghat road to DT road) Road By BC at Ch.00-875m.
|
GCCP-2
|
mirsharai
|
|
0.59
|
|
|
39.29
|
M/S. Mirsharai Enterprise
|
53.64
|
|
|
|
70
|
|
|
|
|
306
|
GCHDP-WD-VZR-CHT-MIRS -18/62
|
Shaheed Shanto Road By BC at Ch.470-795m.
|
GCCP-2
|
mirsharai
|
|
0.88
|
|
|
56.14
|
M/S. Taspia Enterprise
|
60.00
|
|
17/05/2018
|
|
65
|
|
|
|
|
307
|
GCHDP-WD-VZR-CHT-MIRS -18/30
|
Ganak Chara Majar Road (UP-2) By BC at Ch.00-610m.
|
GCCP-2
|
mirsharai
|
|
0.33
|
|
|
24.97
|
M/S. Taspia Enterprise
|
37.32
|
|
|
|
10
|
|
|
|
|
308
|
GCHDP-WD-VZR-CHT-MIRS -18/47
|
Lalmia Saha-Abdullah Qari (Madha Muradpur-Abdus Sattar road) Road By BC at Ch.00-600m.
|
GCCP-2
|
mirsharai
|
|
0.61
|
|
|
38.28
|
M/S.R. A Enterprise
|
54.04
|
|
|
|
0
|
|
|
|
|
309
|
GCHDP-WD-VZR-CHT-MIRS -18/28
|
Uttar Naharpur School (Zakir Hossain Road) Road By BC at Ch.00-1145m.
|
GCCP-2
|
mirsharai
|
|
0.60
|
|
|
51.48
|
|
0.00
|
|
|
|
0
|
|
|
|
|
310
|
GCHDP-WD-VZR-CHT-MIRS -18/39
|
Lick Shab Road (Sheikh shab Road) By BC at Ch.00-785m.
|
GCCP-2
|
mirsharai
|
|
1.15
|
|
|
78.29
|
M/S. R.A Enterprise
|
52.42
|
|
|
|
0
|
|
|
|
|
311
|
GCHDP-WD-VZR-CHT-MIRS -18/37
|
Meherali pandit road (Tili pukur-Hinguli chara) By BC at Ch.00-525m.
|
GCCP-2
|
mirsharai
|
|
0.79
|
|
|
52.52
|
M/S. Nizam Traders
|
39.42
|
|
|
|
25
|
|
|
|
|
312
|
GCHDP-WD-VZR-CHT-MIRS -18/45
|
Muradpur Road (UP-4)By BC at Ch.2500-3100m.
|
GCCP-2
|
mirsharai
|
|
0.53
|
|
|
39.42
|
M/S.R. A Enterprise
|
48.76
|
|
|
|
0
|
|
|
|
|
313
|
GCHDP-WD-VZR-CHT-MIRS -18/50
|
Maddam Tal Baria Road By BC at Ch.800-1450m.
|
GCCP-2
|
mirsharai
|
|
0.60
|
|
|
46.44
|
M/S. Akif Enterprise
|
48.30
|
|
|
|
10
|
|
|
|
|
314
|
GCHDP-WD-VZR-CHT-MIRS -18/49
|
Naherpur Sultan Ahamed Road By BC at Ch.00-400m.
|
GCCP-2
|
mirsharai
|
|
0.65
|
|
|
50.85
|
M/S.Nizam Traders
|
30.45
|
|
|
|
15
|
|
|
|
|
315
|
GCHDP-WD-VZR-CHT-MIRS -18/16
|
Samitir hat-Domkhali Edgah Road By BC at Ch.00-850m.
|
GCCP-2
|
mirsharai
|
|
0.40
|
|
|
30.55
|
|
0.00
|
|
|
|
0
|
|
|
|
|
316
|
GCHDP-WD-VZR-CHT-MIRS -17/18
|
Development of Usha Gazi Road By BC at Ch. 1290-1800m.
|
GCCP-2
|
mirsharai
|
|
|
|
|
39.00
|
|
0.00
|
|
|
|
0
|
|
|
|
|
317
|
GCHDP-WD-VZR-CHT-MIRS -17/21
|
Development of Mirsharai UZ HQ- Rail Line Road (Sah Shua Road) By BC at Ch. 700-1375m.
|
GCCP-2
|
mirsharai
|
|
0.51
|
|
|
39.17
|
M/S. Adian Enterprise
|
40.24
|
|
|
|
0
|
|
|
|
|
318
|
GCHDP-WD-VZR-CHT-MIRS -17/41
|
Development of Jamal Dokan R&H – Rail Link Road (Shah sundar Mia Road) By BC at Ch. 00-550m.
|
GCCP-2
|
mirsharai
|
|
0.68
|
|
|
44.04
|
M/S. Mirsharai Enterprise
|
47.30
|
|
|
|
100
|
|
|
|
|
319
|
GCHDP-WD-VZR-CHT-MIRS -17/08
|
Development of Shaheed Mahbub Alam Road By BC at Ch. 00-400m & 1670-2100m.
|
GCCP-2
|
mirsharai
|
|
0.55
|
|
|
50.79
|
M/S. Shatarupa Enterprise
|
64.61
|
|
|
|
30
|
|
|
|
|
320
|
GCHDP-WD-VZR-CHT-MIRS -17/57
|
Kamar Ali Bazar-Tarakathia By BC at Ch. 00-800m.
|
GCCP-2
|
mirsharai
|
|
0.83
|
|
|
66.43
|
M/S. Hannan Construction
|
65.00
|
|
|
|
0
|
|
|
|
|
321
|
GCHDP-WD-VZR-CHT-MIRS-EX-17/69
|
Jaypur Purba Joar Mosque Road By BC at Ch. 00-700m.
|
GCCP-2
|
mirsharai
|
|
0.80
|
|
|
61.96
|
M/S. Bismillah Trading
|
55.27
|
|
02/11/2017
|
09/03/2018
|
60
|
|
|
|
|
322
|
GCHDP-WD-VZR-CHT-MIRS-EX-17/68
|
Tukumia Mazar Road By BC at Ch. 00-480m.
|
GCCP-2
|
mirsharai
|
|
0.70
|
|
|
49.61
|
M/S. Bismillah Trading
|
44.22
|
|
02/11/2017
|
09/03/2018
|
50
|
|
|
|
|
323
|
GCHDP-WD-VZR–CHT-PATI –MAIN-17/09
|
Sub -Register Bari Via Motaherul Islam Chowdury Bakhali Barua para Road By Seal Coat at Ch. 550-1500m.
|
GCCP-2
|
patiya
|
|
|
|
|
0.00
|
M/S.Niro Enterprise
|
10.42
|
|
21/08/2017
|
28/10/2017
|
0
|
|
|
|
|
324
|
GCHDP-WD-VZR–CHT-PATI –MAIN-17/11
|
Dhawardenga Kaliaish Banga Maji Road By Dense Carpeting at Ch. 00-1500m.
|
GCCP-2
|
patiya
|
|
0.95
|
|
|
10.64
|
M/S. Mans Traders.
|
26.81
|
|
08/08/2017
|
15/10/2017
|
50
|
|
|
|
|
325
|
GCHDP-WD-VZR–CHT-PATI–MAIN-18/01
|
Jiri Saider Madrasa (RHD) - Mansa Chowdhury Para Road ( Abdul Wazed Road) By Seal Coat at ch.2150-3500m
|
GCCP-2
|
patiya
|
|
1.50
|
|
|
29.52
|
|
0.00
|
|
|
|
0
|
|
|
|
|
326
|
GCHDP-WD-VZR–CHT-PATI–MAIN-18/08
|
Vatikhain Steel Bridge - Dhaourdenga Road (Faizur Rahman Chy Road) By Seal Coat at ch.00-2200m
|
GCCP-2
|
patiya
|
|
|
|
|
14.00
|
|
0.00
|
|
|
|
0
|
|
|
|
|
327
|
GCHDP-WD-FRB–CHT-PATI–MAIN-EX-18/01
|
Chakrashala-Olirhat Road By Dende Carpeting.
|
GCCP-2
|
patiya
|
|
2.20
|
|
|
14.00
|
M/S. Maa Enterprise
|
9.52
|
|
|
|
0
|
|
|
|
|
328
|
GCHDP-WD-FRB–CHT-PATI–MAIN-EX-18/02
|
Rashal Sreetee Road By Dende Carpeting.
|
GCCP-2
|
patiya
|
|
1.00
|
|
|
14.00
|
|
0.00
|
|
|
|
0
|
|
|
|
|
329
|
GCHDP-WD-FRB–CHT-PATI–MAIN-EX-18/01
|
Maintenance of Chakrashala (RHD) - Olirhat Road By Seal Coat at Ch. 00 – 1000.
|
GCCP-2
|
patiya
|
|
1.05
|
|
|
14.00
|
|
0.00
|
|
|
|
0
|
|
|
|
|
330
|
GCHDP-WD-UZR–CHT-PATI–MAIN-NEW -18/04
|
Saw Mill (RHD) – Bhattcharjee Hat GC ( Shekh Rasel Sreety) Road By Dense Carpeting at ch.00-1050m.
|
GCCP-2
|
patiya
|
|
1.00
|
|
|
10.02
|
|
0.00
|
|
|
|
0
|
|
|
|
|
331
|
GCHDP-WD-FRB-CHT-PATI-16/02
|
Old Cox,s bazar Road(Kalar pool UP office-Fakirnir hat-Merin academy) (From RHD #132) (Ch. 9440m-9795m)
|
GCCP-2
|
patiya
|
|
|
|
|
0.00
|
M/S. Mohammed Selim & Brothers
|
19.68
|
|
03/04/2017
|
10/08/2017
|
70
|
|
|
|
|
332
|
GCHDP-WD-FRB-CHT-PATI-16/03
|
Santir hat-Ziri Madrasha Maliara-Mohera Fakira Mosjid Road By BC at Ch: 5330m-6190m.
|
GCCP-2
|
patiya
|
|
0.26
|
|
|
33.00
|
M/S. ARM Engineers.
|
64.92
|
|
14/07/2016
|
21/01/2017
|
100
|
|
|
|
|
333
|
GCHDP-WD-FRB –CHT-PATIYA - STR-16/04
|
Construction of 22.00m Long RCC Girder Bridge (Muslim Kjar Bridge) over Kerinja Khal on Bipin Behary Nandy Road at Ch. 3776m
|
GCCP-2
|
patiya
|
|
0.86
|
|
|
67.32
|
M/S. Shamim & Brothers
|
158.29
|
|
16/03/2017
|
23/03/2018
|
90
|
|
|
|
|
334
|
GCHDP-WD-FRB-CHT-PATI-17/01
|
Monsartek (RHD)-Kantafakirhat GC via Kusumpura UP (Abbas sikder connecting Road)Road By BC at Ch. 6000-7200m.
|
GCCP-2
|
patiya
|
|
|
|
|
90.00
|
M/S. Shah Godi Trading
|
93.44
|
|
|
|
65
|
|
|
|
|
335
|
GCHDP-WD-UNR-CHT-PATI-16/02
|
Abdul Jalil Chowdhury Road By Bc at Ch. 3040-3740m.
|
GCCP-2
|
patiya
|
|
|
|
|
0.00
|
|
0.00
|
|
|
|
0
|
|
|
|
|
336
|
GCHDP-WD-UNR-CHT-PATI-16/01
|
Haidgaon-Kelishahar Union Road.(Haidgaon shahid smrity Road By HBB at Ch: 00m-1965m.
|
GCCP-2
|
patiya
|
|
0.70
|
|
|
56.00
|
M/S. Mans Traders.
|
65.41
|
|
18/07/2016
|
25/01/2017
|
100
|
|
|
|
|
337
|
GCHDP-WD-UNR-CHT-PATI -16/03
|
Patiya Tagar Puni Road By BC at Ch. 5080-5940m.
|
GCCP-2
|
patiya
|
|
1.96
|
|
|
70.71
|
M/S. Azad Enterprise
|
52.54
|
|
26/12/2016
|
30/06/2017
|
100
|
|
|
|
|
338
|
GCHDP-WD-UNR-CHT-PATI -16/04
|
Shae Godi Road by BC at Ch. 00-813m
|
GCCP-2
|
patiya
|
|
0.86
|
|
|
56.00
|
M/S. Shah Godi Trading
|
53.11
|
|
|
|
60
|
|
|
|
|
339
|
GCHDP-WD-VZR –CHT-PATIYA-16/13
|
Alam Mazi Road (Ch. 00 - 1680m)
|
GCCP-2
|
patiya
|
|
|
|
|
0.00
|
M/S.Tohid & Brothers
|
163.03
|
|
10/04/2016
|
17/04/2017
|
95
|
|
|
|
|
340
|
GCHDP-WD-VZR –CHT-PATIYA-16/17
|
Super Petrochemical Road By BC at Ch. 00 -525m)
|
GCCP-2
|
patiya
|
|
1.68
|
|
|
56.00
|
M/S.Mans Traders
|
45.79
|
|
30/03/2016
|
30/11/2017
|
100
|
|
|
|
|
341
|
GCHDP-WD-VZR –CHT-PATIYA-16/16
|
Haidgaon Ziayar Para Hazi Bazlur Rahman Road By Bc at Ch. 0.00 - 740m.
|
GCCP-2
|
patiya
|
|
0.53
|
|
|
23.00
|
M/S. Shah Amir Construction
|
39.64
|
|
26/02/2017
|
05/07/2017
|
100
|
|
|
|
|
342
|
GCHDP-WD-VZR-CHT-PATI-16/11
|
Charlaikha Hospital Road(Ali Hossen market-Goal para). Ch. 00-500m
|
GCCP-2
|
patiya
|
|
0.74
|
|
|
42.00
|
M/S. Nipa Enterprise
|
21.93
|
|
12/06/2017
|
19/10/2017
|
70
|
|
|
|
|
343
|
GCHDP-WD-VZR-CHT-PATI-16/12
|
Ichanagar-Khowaz Nagar Charpather Ghata (I.K.C) Road By Bc at Ch. 4500-4900m.
|
GCCP-2
|
patiya
|
|
0.40
|
|
|
28.00
|
|
0.00
|
|
|
|
0
|
|
|
|
|
344
|
GCHDP-WD-VZR-CHT-PATI-16/14
|
Shikal baha Char Hazari Road By Bc at Ch. 00m-500m.
|
GCCP-2
|
patiya
|
|
0.40
|
|
|
28.00
|
Mohammed Selim & Brothers
|
19.63
|
|
24/05/2017
|
30/09/2017
|
70
|
|
|
|
|
345
|
GCHDP-WD-VZR-CHT-PATI-16/09
|
Sirazul Islam Ayub Road By BC at Ch: 00m-530m
|
GCCP-2
|
patiya
|
|
0.50
|
|
|
28.00
|
M/S.Shah Gadi Trading.
|
16.24
|
|
18/07/2016
|
30/04/2017
|
100
|
|
|
|
|
346
|
GCHDP-WD-VZR-CHT-PATI-16/10
|
Haidgaon Sirajul Haque Talukder Road via Bashi Member Road By BC at Ch: 00m-500m.
|
GCCP-2
|
patiya
|
|
0.53
|
|
|
16.26
|
M/S. Kashem Brothers
|
16.24
|
|
28/06/2016
|
05/11/2016
|
100
|
|
|
|
|
347
|
GCHDP-WD-VZR-CHT-PATI-17/01
|
Harinkhain Sayed Ahamad chowdhury Road.(Dr. Muslim Road),By HBB.
|
GCCP-2
|
patiya
|
|
0.50
|
|
|
16.52
|
M/S.Pavel Enterprise
|
103.77
|
|
|
|
30
|
|
|
|
|
348
|
GCHDP-WD-VZR-CHT-PATI -16/06
|
Pairul Chowdhury Bari Road By BC at Ch. 00-515m.
|
GCCP-2
|
patiya
|
|
1.44
|
|
|
25.00
|
A N J Corporation
|
29.90
|
|
02/11/2016
|
09/04/2017
|
100
|
|
|
|
|
349
|
GCHDGCHDP-WD-VZR-CHT-PATI -16/06P-WD-VZR-CHT-PATI -16/02
|
Asia Younus Khalifa Road.(Ayub Ali Road) By HBB at Ch. 00-750m.
|
GCCP-2
|
patiya
|
|
0.52
|
|
|
25.00
|
A N J Corporation
|
23.33
|
|
02/11/2016
|
09/04/2017
|
100
|
|
|
|
|
350
|
GCHDP-WD-VZR-CHT-PATI -16/03
|
Kaliaish Suvandandi-Khankhanabad Road By HBB at Ch. 4700-5650m.
|
GCCP-2
|
patiya
|
|
0.75
|
|
|
25.00
|
M/S. Mans Traders
|
28.15
|
|
19/12/2016
|
26/05/2017
|
100
|
|
|
|
|
351
|
GCHDP-WD-VZR-CHT-PATI -17/04
|
Dhakhin Mozafarabad Road by HBB at Ch.00-750m.
|
GCCP-2
|
patiya
|
|
0.95
|
|
|
31.00
|
M/S. Mans Traders
|
28.37
|
|
20/11/2017
|
27/03/2018
|
90
|
|
|
|
|
352
|
GCHDP-WD-VZR-CHT-PATI -17/07
|
Alampur Issarkhain Uttar Samura Road By BC at Ch. 00-1000m.
|
GCCP-2
|
patiya
|
|
0.75
|
|
|
30.62
|
M/S. Shah Amir Construction
|
76.48
|
|
|
|
40
|
|
|
|
|
353
|
GCHDP-WD-VZR-CHT-PATI -17/08
|
Dhaighat Purnendu Dastider Road By HBB at Ch.1000-1850m.
|
GCCP-2
|
patiya
|
|
1.00
|
|
|
77.41
|
M/S. Alam Enterprise
|
34.95
|
|
|
|
70
|
|
|
|
|
354
|
GCHDP-WD-VZR-CHT-PATI -17/15
|
Jangalkhain Paschim Para Road By BC at Ch.00-500m.
|
GCCP-2
|
patiya
|
|
0.85
|
|
|
36.32
|
|
0.00
|
|
|
|
0
|
|
|
|
|
355
|
GCHDP-WD-FRB-RANG -MAIN-16/01
|
Maintenance of Hazee Sayed Ali Road By Dence Carpation at Ch.3655-4640m
|
GCCP-2
|
rangunia
|
|
|
|
|
0.00
|
M/S. Akhi International
|
14.95
|
|
19/04/2016
|
26/02/2017
|
100
|
|
|
|
|
356
|
GCHDP-WD-VZR-RANG -MAIN-16/05
|
Sufipara Dargha Road By Re-Seal at Ch. 00-572m
|
GCCP-2
|
rangunia
|
|
0.99
|
|
|
15.99
|
M/S. Nurullah Enterprise
|
7.71
|
|
10/01/2017
|
17/05/2017
|
90
|
|
|
|
|
357
|
GCHDP-WD-VZR-RANG -MAIN-16/08
|
Magon road S. Rajanagar Road By Re-Seal at Ch.00-1226m
|
GCCP-2
|
rangunia
|
|
0.57
|
|
|
7.73
|
M/S. Alamgir Enterprise
|
10.66
|
|
09/01/2017
|
16/05/2017
|
100
|
|
|
|
|
358
|
GCHDP-WD-UNR–CHT-RANG–MAIN-16/01
|
Ram Mohan Sikder Road (Rangunia UP - Tarachan Hat).Road By Seal Coat at Ch. 00–1531m.
|
GCCP-2
|
rangunia
|
|
1.23
|
|
|
11.00
|
Khaja Gorebay Newaz Enterprise
|
13.28
|
|
05/02/2017
|
12/06/2017
|
100
|
|
|
|
|
359
|
GCHDP-WD-VZR–CHT-RANG –MAIN-16/06
|
Murad nagar East Road By BC at Ch. 1390–1873m.
|
GCCP-2
|
rangunia
|
|
1.00
|
|
|
14.00
|
M/S. F. R Traders
|
10.40
|
|
15/05/2017
|
22/09/2017
|
100
|
|
|
|
|
360
|
GCHDP-WD-VZR–CHT-RANG–MAIN-17/02
|
RHD Brammanghat-Daricupe High School-Chipchari Pekua Fruits Fram ( Daricupe Road ) Road By BC at Ch. 00-700m.
|
GCCP-2
|
rangunia
|
|
0.48
|
|
|
14.00
|
M/S. Yakub & Brothers
|
11.64
|
|
|
|
100
|
|
|
|
|
361
|
GCHDP-WD-VZR–CHT-RANG–MAIN-17/07
|
North Noagown Road ( Jute Mill Gate-Maddha Nowagawn GPS ) By BC at Ch. 00-746m, 880-914m
|
GCCP-2
|
rangunia
|
|
0.70
|
|
|
11.20
|
|
0.00
|
|
|
|
0
|
|
|
|
|
362
|
GCHDP-WD-VZR–CHT-RANG–MAIN-17/04
|
Maintenance of South Nichintupur A. Salam Road By BC at Ch. 00-835m.
|
GCCP-2
|
rangunia
|
|
0.78
|
|
|
7.00
|
|
0.00
|
|
|
|
0
|
|
|
|
|
363
|
GCHDP-WD-VZR–CHT-RANG–MAIN-18/01
|
Maintenance of RHD Santinication Bazar-Brommotar Nurul Uluam Madrasha-TC Hat ( Korban Ali Road ) Road By Dense Carpeting at ch.00-1200m
|
GCCP-2
|
rangunia
|
|
0.84
|
|
|
0.00
|
|
0.00
|
|
|
|
0
|
|
|
|
|
364
|
GCHDP-WD-FRB-CHT-RANG-16/01
|
Hazee Sayed Ali (Sarafvhata) Road By BC at Ch. Ch.14000m-15020m & 20m bridge on Raikhaali Khal at Ch.120m.
|
GCCP-2
|
rangunia
|
|
|
|
|
0.00
|
M/S.Akhi International
|
98.67
|
|
19/04/2016
|
26/02/2017
|
80
|
|
|
|
|
365
|
GCHDP-WD-FRB-CHT-RANG-STR-17/01(01)
|
Construction of 20.00m Long RCC Girder Bridge Over Rai Khali Khal on Hazee Sayed Ali Road at Ch. 120m.
|
GCCP-2
|
rangunia
|
|
1.02
|
|
|
124.00
|
M/S. Saleha Construction
|
68.07
|
|
29/11/2017
|
06/12/2018
|
40
|
|
|
|
|
366
|
GCHDP-WD-UNR-CHT-RANG-17/01
|
Maiddah Parua (Parua UP HQ-Sonichari Bazar) Road By HBB at Ch: 1640-2459m.
|
GCCP-2
|
rangunia
|
|
|
|
|
0.00
|
M/S. Mahbub Enterprise
|
31.18
|
|
26/07/2017
|
02/12/2017
|
90
|
|
|
|
|
367
|
GCHDP-WD-VZR-CHT-RANG-16/06
|
Nazru Para Road By BC Ch:745m-1405m.
|
GCCP-2
|
rangunia
|
|
|
|
|
0.00
|
Nur Ullah Enterprise
|
28.20
|
|
07/11/2006
|
14/03/2017
|
100
|
|
|
|
|
368
|
GCHDP-WD-VZR-CHT-RANG-16/07
|
Rawshania Tyabia Madrasha Road By HBB at Ch.00-750m
|
GCCP-2
|
rangunia
|
|
0.66
|
|
|
36.00
|
M/S. Jahanara & Sons
|
32.27
|
|
19/12/2016
|
30/11/2017
|
100
|
|
|
|
|
369
|
GCHDP-WD-VZR-CHT-RANG -16/15
|
Ranir Hat-Laingapara (Al-amin Para) Road By HBB at Ch. 00-5m, 38-138m & 345-736m.
|
GCCP-2
|
rangunia
|
|
0.75
|
|
|
33.00
|
M/S. Abhi Enterprise
|
16.15
|
|
23/10/2016
|
02/03/2017
|
85
|
|
|
|
|
370
|
GCHDP-WD-VZR-CHT-RANG-16/22
|
Chowdhury Para - Banik Para Road By HBB at Ch. 00-725m.
|
GCCP-2
|
rangunia
|
|
0.50
|
|
|
22.00
|
M/S. Alamgir Enterpr.
|
33.19
|
|
08/02/2017
|
15/06/2017
|
100
|
|
|
|
|
371
|
GCHDP-WD-VZR-CHT-RANG-17/09
|
Rafique Road By HBB at Ch: 1215-1265m & 1359-1699m.
|
GCCP-2
|
rangunia
|
|
0.73
|
|
|
36.00
|
M/S. Jahanara & Sons
|
23.22
|
|
12/07/2017
|
19/11/2017
|
80
|
|
|
|
|
372
|
GCHDP-WD-VZR –CHT-RANG- STR-16/03
|
Construction of 24.00m Long RCC Girder Bridge over Kurmai Khal on Agunia Tea Garden Road at Ch. 1740m.
|
GCCP-2
|
rangunia
|
|
0.90
|
|
|
24.00
|
M/S. Yousuf Construction
|
152.87
|
|
06/04/2017
|
13/04/2018
|
100
|
|
|
|
|
373
|
GCHDP-WD-VZR –CHT-RANG-17/01
|
RHD Sistal –Sonargaon High School-Rafique Miahar Farm (Sonargaon Road) Road By BC at Ch. 1140-1440m.
|
GCCP-2
|
rangunia
|
|
|
|
|
172.76
|
M/S. Karnafully Traders
|
27.03
|
|
|
|
0
|
|
|
|
|
374
|
GCHDP-WD-VZR –CHT-RANG-17/14
|
Hazee Para (Chandraghona) Road By HBB at Ch. 160-414m & 461-550m.
|
GCCP-2
|
rangunia
|
|
0.30
|
|
|
28.00
|
M/S. Chowdhury Construction
|
15.48
|
|
|
|
100
|
|
|
|
|
375
|
GCHDP-WD-VZR–CHT-RANG-17/05
|
Burir Dokan – Pomra Asrayan Prokolpo (Pomra Bomihin Road Burir Dokan Connecting Road.) Road By HBB at Ch. 425-470m,545-610m,665-690m & 725-864m.
|
GCCP-2
|
rangunia
|
|
0.34
|
|
|
16.00
|
M/S. K. R Traders
|
14.69
|
|
|
|
100
|
|
|
|
|
376
|
GCHDP-WD-VZR–CHT-RANG-17/16
|
Mozumder khill Durga Bari Connecting (Durgabari Road)Road By HBB at Ch. 180-530m.
|
GCCP-2
|
rangunia
|
|
0.27
|
|
|
16.00
|
M/S. Ayub & Brothers
|
22.75
|
|
|
|
100
|
|
|
|
|
377
|
GCHDP-WD-VZR–CHT-RANG-17/11
|
Parua Sankar Road Start from Parua D.C. Road By HBB at Ch. 00-195m.
|
GCCP-2
|
rangunia
|
|
|
|
|
16.50
|
M/S. Ahamadia Traders
|
15.34
|
|
|
|
0
|
|
|
|
|
378
|
GCHDP-WD-VZR-CHT-RANG-17/21
|
Kalurghat Road-Hafez Sarif Road (Munsur Ali Road) Road By RCC at Ch. 00-132m.
|
GCCP-2
|
rangunia
|
|
0.20
|
|
|
16.50
|
M/S. Nissan Traders
|
13.60
|
|
|
|
0
|
|
|
|
|
379
|
GCHDP-WD-VZR-CHT-RANG -18/10`
|
Nazu Meah Talukder Road By HBB at Ch.2520-3200m.
|
GCCP-2
|
rangunia
|
|
0.13
|
|
|
16.06
|
Nur Enterprise
|
34.48
|
|
|
|
0
|
|
|
|
|
380
|
GCHDP-WD-VZR-CHT-RANG -18/20
|
Majumder Khil School - Pattali Road By HBB at Ch.178-680m.
|
GCCP-2
|
rangunia
|
|
0.68
|
|
|
24.86
|
M/S. Nur Enterprise
|
23.61
|
|
|
|
70
|
|
|
|
|
381
|
GCHDP-WD-VZR-CHT-RANG -18/18
|
Parua D.C UZR – Sonaichari Khal (Sagor Road ) By HBB at Ch.00-270m.
|
GCCP-2
|
rangunia
|
|
0.50
|
|
|
24.86
|
M/S. Nur Enterprise
|
15.98
|
|
|
|
0
|
|
|
|
|
382
|
GCHDP-WD-VZR-CHT-RANG -18/17
|
South Nischintapur Maddam Para Road ( St. South side of Nicchintapur Bazar) By HBB at Ch.00-250m.
|
GCCP-2
|
rangunia
|
|
0.27
|
|
|
16.83
|
M/S. Ayub & Brothers
|
15.91
|
|
|
|
0
|
|
|
|
|
383
|
GCHDP-WD-VZR-CHT-RANG -18/10
|
Nazu Meah Talukder Road By HBB at Ch.2520-3200m.
|
GCCP-2
|
rangunia
|
|
0.25
|
|
|
16.74
|
|
0.00
|
|
|
|
0
|
|
|
|
|
384
|
GCHDP-WD-FRB–CHT-RAOZ–MAIN-17/01
|
Gohira R&H Halda Ghat at Hatajari ( Khan Bahadur Abdul Jabbar Road-1)( From RHD#100) By RCC( Link) at Ch. 00-100m.
|
GCCP-2
|
raojan
|
|
|
|
|
15.46
|
|
0.00
|
|
|
|
0
|
|
|
|
|
385
|
GCHDP-WD-VZR–CHT-RAOZ –MAIN-17/01
|
Chittagong – Rangamati (R&H) Road-Chikdair UP (Shaheb Bari Road)
By Dense Carpeting at Ch. 00-2000m.
|
GCCP-2
|
raojan
|
|
1.00
|
|
|
43.01
|
M/S. Fabiha Enterprise
|
42.99
|
|
29/11/2017
|
06/03/2018
|
40
|
|
|
|
|
386
|
GCHDP-WD-VZR–CHT-RAOZ –MAIN-17/09
|
khan Bahadur Abdul Jabbor road-1 – Binajuri Sonair Muck Via Gohira Jamtol Road (khan Bahadur Abdul Jabbor road-2 )By Dense Carpeting at Ch. 00-1115m.
|
GCCP-2
|
raojan
|
|
2.00
|
|
|
29.97
|
The Paramount International
|
31.47
|
|
05/03/2018
|
12/06/2018
|
100
|
|
|
|
|
387
|
GCHDP-WD-VZR–CHT-RAOZ –MAIN-17/08
|
Mohammed Zaman (Jonab Bibi) Road( Rawli Road to Ctg Kaoti Road) By Dense Carpeting at Ch. 00-600m.
|
GCCP-2
|
raojan
|
|
1.12
|
|
|
15.58
|
M/S. Munna Enterprise
|
15.47
|
|
17/08/2017
|
24/11/2017
|
100
|
|
|
|
|
388
|
GCHDP-WD-VZR–CHT-RAOZ–MAIN-17/07
|
A.K.M Fajlul Kabir Chowdhury Road By RCC at Ch. 00-226m & 00-60m.
|
GCCP-2
|
raojan
|
|
0.60
|
|
|
22.44
|
M/S. Hoque & Brothers
|
22.43
|
|
05/12/2017
|
12/02/2018
|
100
|
|
|
|
|
389
|
GCHDP-WD-VZR–CHT-RAOZ–MAIN-17/03
|
Abdul karim Road (Haludia UP) By RCC at Ch.600-700m & 750-1252m.
|
GCCP-2
|
raojan
|
|
0.29
|
|
|
21.15
|
M/S. Hazrat Shahjalal Bricks Manufactruer
|
21.13
|
|
20/09/2017
|
27/11/2017
|
100
|
|
|
|
|
390
|
GCHDP-WD-UNR-CHT-RAOZ-16/02
|
Section-3 Dabua/Chickdair Akbar Saha Road By BC at Ch. 4036-5177m.
|
GCCP-2
|
raojan
|
|
|
|
|
56.00
|
M/S Aziz Monoara Enterprise
|
66.90
|
|
31/10/2016
|
07/04/2017
|
100
|
|
|
|
|
391
|
GCHDP-WD-UNR-CHT-RAOZ-16/07
|
Gohira Fatickchari(R&H) Road to Ichapur(UZR) Road via Gohira Union Parisad Road By BC at Ch. 440-1300m.
|
GCCP-2
|
raojan
|
|
1.14
|
|
|
54.00
|
Mrs. Fabiha Enterprise.
|
56.00
|
|
17/10/2016
|
15/06/2017
|
100
|
|
|
|
|
392
|
GCHDP-WD-UNR-CHT-RAOZ-16/09
|
Amir Hat G.C-Fatickchari Upazila Connect South Karim( via Holadia UP Office) Road By BC & HBB at Ch.2208-2350m & 5130-6300m.
|
GCCP-2
|
raojan
|
|
0.86
|
|
|
45.00
|
Mrs. Iqbal & Brothers.
|
49.81
|
|
23/10/2016
|
30/03/2017
|
100
|
|
|
|
|
393
|
GCHDP-WD-UNR-CHT-RAOZ- 17/01
|
Chikdair UP office Maddya Pathanpara Kagatia Hat (R&H) via Kundasshari road By RCC at Ch. 4000-4440m & Ch. 4440-4850m (Kundasshari Road) By HBB.
|
GCCP-2
|
raojan
|
|
1.31
|
|
|
40.40
|
M/S. S. M. Trading
|
40.19
|
|
03/10/2017
|
10/02/2018
|
100
|
|
|
|
|
394
|
GCHDP-WD-UNR-RAOZ-17/08
|
Development of Noapara Kachukine Road By BC at Ch. 2300-2600m.
|
GCCP-2
|
raojan
|
|
0.85
|
|
|
6.05
|
M/S. Pubali Traders
|
6.05
|
|
06/09/2017
|
13/01/2018
|
0
|
|
|
|
|
395
|
GCHDP-WD-UNR-RAOZ-17/10
|
Development of Chittagong -Kaptai R&H road at Managazi to Baizzakhali Bazar LM at Urkirchar UP Office Road Minagazi Urkirchot By Danse Carpeting at Ch. 00-766m (ID No. 415743014)
|
GCCP-2
|
raojan
|
|
0.30
|
|
|
30.80
|
M/S. Fabiha Enterprise
|
33.78
|
|
07/05/2018
|
14/09/2018
|
80
|
|
|
|
|
396
|
GCHDP-WD-VZR-CHT-RAOZ-16/07
|
Madun Jungle Road (Noapara) By BC at Ch. 240-620m.
|
GCCP-2
|
raojan
|
|
|
|
|
16.00
|
M/S. Suja Enterprise
|
20.88
|
|
17/10/2016
|
24/02/2017
|
100
|
|
|
|
|
397
|
GCHDP-WD-VZR-CHT- RAOZ-17/15
|
Raozan Rangamati Road – Pachim Raozan Road Near Pink City By RCC (Link) at Ch.CH.00-320m.
|
GCCP-2
|
raojan
|
|
0.73
|
|
|
28.07
|
M/S. Bostame Enterprise
|
43.87
|
|
19/02/2018
|
26/06/2018
|
100
|
|
|
|
|
398
|
GCHDP-WD-VZR-CHT- RAOZ -16/20
|
Kadalpur Battacharja para Road By HBB at Ch: 00m-311m.
|
GCCP-2
|
raojan
|
|
0.31
|
|
|
7.00
|
M/S. Iqbal & Brothers
|
6.95
|
|
19/07/2016
|
26/12/2016
|
100
|
|
|
|
|
399
|
GCHDP-WD-VZR-CHT-RAOZ-16/24
|
Khan Bahadur Abdul Jabbar-2 Kagatia Hat (LM) Via Sonair Muck (West Binajuri Sonair Muck) Road By HBB at Ch. 500-1550m.
|
GCCP-2
|
raojan
|
|
0.31
|
|
|
10.00
|
M/S Pubali Traders
|
24.75
|
|
03/11/2016
|
10/03/2017
|
100
|
|
|
|
|
400
|
GCHDP-WD-VZR-CHT- RAOZ -16/31
|
Kutia Batta para Road By HBB at Ch: 75m-330m.
|
GCCP-2
|
raojan
|
|
1.05
|
|
|
6.00
|
M/S.M.R Construction
|
5.73
|
|
30/06/2016
|
07/11/2016
|
100
|
|
|
|
|
401
|
GCHDP-WD-VZR-CHT-RAOZ -16/38
|
Raozan Hazi Morhom Nazmul Huda Chowdhury Road. By HBB at Ch. 00-210m, 245-315m & 315-450m.
|
GCCP-2
|
raojan
|
|
0.26
|
|
|
10.00
|
M/S Nahian Traders.
|
11.16
|
|
|
26/02/2017
|
100
|
|
|
|
|
402
|
GCHDP-WD-VZR-CHT- RAOZ -16/46
|
Mina Akbor Road(Damage Portion) By HBB at Ch. 500-570m.
|
GCCP-2
|
raojan
|
|
0.73
|
|
|
6.00
|
M/S. S. M Trading
|
11.96
|
|
18/12/2016
|
25/04/2017
|
100
|
|
|
|
|
403
|
GCHDP-WD-VZR-CHT- RAOZ -16/75
|
Kundeshari Ram Jiban Road By BC at Ch: 00m-300m.
|
GCCP-2
|
raojan
|
|
0.07
|
|
|
10.00
|
M/S. Suja Enterprise
|
10.04
|
|
16/10/2016
|
23/02/2017
|
100
|
|
|
|
|
404
|
GCHDP-WD-VZR-CHT- RAOZ -16/95
|
Pahartali Khan para Rroad By RCC at Ch: 00m-200m.
|
GCCP-2
|
raojan
|
|
0.30
|
|
|
8.00
|
M/S. Sonali Traders
|
8.54
|
|
24/07/2016
|
15/06/2017
|
100
|
|
|
|
|
405
|
GCHDP-WD-VZR-CHT- RAOZ -16/96
|
Pahartali Sheakh para to Khan para Road By RCC at Ch: 00m-200m.
|
GCCP-2
|
raojan
|
|
0.20
|
|
|
8.00
|
M/S. Sonali Traders
|
8.55
|
|
24/07/2016
|
15/06/2017
|
100
|
|
|
|
|
406
|
GCHDP-WD-VZR-RAOZ-16/106
|
Moiskoran Hazrat Rostom Sha Rahmat Ulla road,Har para Road,Sakemder bari Road (Bajakhali Nath para, Joy nagor Road by HBB at Ch.00-132m,00-32m & 00-40m.
|
GCCP-2
|
raojan
|
|
0.20
|
|
|
6.00
|
M/S. M.A Traders
|
6.56
|
|
06/06/2017
|
13/10/2017
|
80
|
|
|
|
|
407
|
GCHDP-WD-VZR-CHT-RAOZ-16/110
|
Baguan Nasim Jangle Road (Koye para-Shil para) by HBB at Ch. 2000-2586m.
|
GCCP-2
|
raojan
|
|
0.20
|
|
|
8.00
|
Mrs. Sabb Traders
|
17.66
|
|
26/10/2016
|
02/03/2017
|
100
|
|
|
|
|
408
|
GCHDP-WD-VZR-CHT- RAOZ -16/138
|
Sarkar para Mog Chitta last portion / Intaj Barii Road by HBB at Ch: 300m-630m & 00-50m.
|
GCCP-2
|
raojan
|
|
0.59
|
|
|
10.00
|
Sayma Trate Enterprise
|
10.07
|
|
18/07/2016
|
25/11/2017
|
100
|
|
|
|
|
409
|
GCHDP-WD-VZR-RAOZ-16/04
|
Holadia Gada Moulavi road by HBB Ch.450-850m
|
GCCP-2
|
raojan
|
|
0.38
|
|
|
10.98
|
M/S. Iqbal & Brothers
|
10.76
|
|
16/02/2017
|
23/06/2017
|
100
|
|
|
|
|
410
|
GCHDP-WD-VZR-RAOZ-16/11
|
Raozan Shab babi road by HBB Ch.2000-2500m
|
GCCP-2
|
raojan
|
|
0.40
|
|
|
13.37
|
M/S. K. Alam Traders
|
13.36
|
|
28/02/2017
|
07/07/2017
|
100
|
|
|
|
|
411
|
GCHDP-WD-VZR-RAOZ-16/16
|
Development of Gulzar Para Village road/Kashem Nagar Road and Badsha Mia Bari Road by HBB at Ch. 00-100m, 00-100m, 00-30m, 00-60m, 60-260 & 00-36m
|
GCCP-2
|
raojan
|
|
0.50
|
|
|
10.30
|
Sayma Thate Enterprise
|
10.30
|
|
05/03/2017
|
12/07/2017
|
100
|
|
|
|
|
412
|
GCHDP-WD-VZR-RAOZ-16/17
|
Kagotia Abu Mia/Ahmad Sagir and Farikur Bari Road by HBB at Ch. 00-162m, 00-80m, 00-90m & 90-120m
|
GCCP-2
|
raojan
|
|
0.43
|
|
|
8.17
|
Sayma Thate Enterprise
|
8.17
|
|
05/03/2017
|
12/07/2017
|
100
|
|
|
|
|
413
|
GCHDP-WD-VZR-RAOZ-16/21
|
Kadalpur Dakkin Joynager Pachim barua para road by HBB Ch.490-860m
|
GCCP-2
|
raojan
|
|
0.36
|
|
|
8.64
|
M/S. Salam & Brother's
|
8.59
|
|
16/03/2017
|
23/07/2017
|
100
|
|
|
|
|
414
|
GCHDP-WD-VZR-RAOZ-16/23
|
Kadalpur Kala mia Baper bari road by HBB Ch.80-250m
|
GCCP-2
|
raojan
|
|
0.37
|
|
|
4.02
|
M/S. Salam & Brother's
|
3.97
|
|
16/03/2017
|
23/07/2017
|
100
|
|
|
|
|
415
|
GCHDP-WD-VZR-RAOZ-16/25
|
Lalangara Dost Mohamed (Binajuri) road by HBB Ch. 75-514m
|
GCCP-2
|
raojan
|
|
0.17
|
|
|
9.73
|
|
0.00
|
|
|
|
0
|
|
|
|
|
416
|
GCHDP-WD-VZR-RAOZ-16/32
|
Mohash Pondit bari & Dr.Bola nath road by HBB Ch.00-240m & 00-160m
|
GCCP-2
|
raojan
|
|
0.44
|
|
|
8.17
|
M/S. S. M. Traders
|
8.16
|
|
16/02/2017
|
14/07/2017
|
100
|
|
|
|
|
417
|
GCHDP-WD-VZR-RAOZ-16/37
|
Raozan Rashidar para Chan mia road by HBB Ch.3480-4000m
|
GCCP-2
|
raojan
|
|
0.40
|
|
|
13.85
|
M/S. K. Alam Traders
|
13.85
|
|
28/02/2017
|
07/07/2017
|
100
|
|
|
|
|
418
|
GCHDP-WD-VZR-RAOZ-16/48
|
Karim member (Hafazea Madrasha) road by HBB at Ch.00-950m
|
GCCP-2
|
raojan
|
|
0.52
|
|
|
24.54
|
M/S.Kashem Enterprise
|
24.54
|
|
10/04/2017
|
27/03/2018
|
100
|
|
|
|
|
419
|
GCHDP-WD-VZR-RAOZ-16/49
|
East Guzra Shat Baria road by HBB at Ch.00-1540m
|
GCCP-2
|
raojan
|
|
0.95
|
|
|
38.03
|
M/S. Munna Enterprise
|
37.95
|
|
22/03/2017
|
29/07/2017
|
95
|
|
|
|
|
420
|
GCHDP-WD-VZR-RAOZ-16/53
|
Kadalpur Shieakdar para Kazi para road by HBB at Ch.150-450m
|
GCCP-2
|
raojan
|
|
1.54
|
|
|
7.59
|
M/S. Salam & Brother's
|
7.42
|
|
22/03/2017
|
30/07/2017
|
100
|
|
|
|
|
421
|
GCHDP-WD-VZR-RAOZ-16/54
|
Kadalpur Bumor para road by HBB at Ch.100-535m
|
GCCP-2
|
raojan
|
|
0.30
|
|
|
10.05
|
M/S. Salam & Brother's
|
9.85
|
|
22/03/2017
|
30/07/2017
|
100
|
|
|
|
|
422
|
GCHDP-WD-VZR-RAOZ-16/56
|
Samser para (Kadalpur) road by HBB at Ch.00-580m
|
GCCP-2
|
raojan
|
|
0.44
|
|
|
13.35
|
M/S. Salam & Brother's
|
13.14
|
|
22/03/2017
|
30/07/2017
|
100
|
|
|
|
|
423
|
GCHDP-WD-VZR-RAOZ-16/60
|
Raozan Napara Section-1 (R&H) road at Chitaipara-Raozan-Noapara Section-1 (R&H) at Kagotia hat (KM) via Langara Para road (Lalangara para road) By HBB at Ch.2000-2390m
|
GCCP-2
|
raojan
|
|
0.58
|
|
|
7.97
|
|
0.00
|
|
|
|
0
|
|
|
|
|
424
|
GCHDP-WD-VZR-RAOZ-16/63
|
Binajuri Boddho Mandir road by HBB at Ch.00-360m
|
GCCP-2
|
raojan
|
|
0.39
|
|
|
8.53
|
M/S. Sayma Thate Enterprise
|
8.52
|
|
07/03/2017
|
14/07/2017
|
100
|
|
|
|
|
425
|
GCHDP-WD-VZR-RAOZ-16/72
|
Dabua Dakkin Hingala Santi nagor road (East Guzra Hajir Pul road) By HBB at Ch. 00-550m.
|
GCCP-2
|
raojan
|
|
0.36
|
|
|
14.08
|
M/S. Munna Enterprise
|
14.06
|
|
22/03/2017
|
29/07/2017
|
60
|
|
|
|
|
426
|
GCHDP-WD-VZR-RAOZ-16/87
|
Haladin Karagar bari road By HBB at Ch.500-860m
|
GCCP-2
|
raojan
|
|
0.55
|
|
|
9.99
|
M/S Iqbal & Brothers
|
9.99
|
|
29/05/2017
|
05/10/2017
|
100
|
|
|
|
|
427
|
GCHDP-WD-VZR-RAOZ-16/88
|
Ali Hossain Fakir road By HBB at Ch.230-235m, 300-1060m & 1800-1835m
|
GCCP-2
|
raojan
|
|
0.36
|
|
|
24.88
|
Hazrat Shahjalal Brick Manufacturers
|
24.87
|
|
04/04/2017
|
11/08/2017
|
100
|
|
|
|
|
428
|
GCHDP-WD-VZR-RAOZ-16/89
|
Joynager Barua para Shashan road By HBB at Ch.00-400m
|
GCCP-2
|
raojan
|
|
0.80
|
|
|
10.40
|
M/S. K. Alam Traders
|
10.40
|
|
28/02/2017
|
07/07/2017
|
100
|
|
|
|
|
429
|
GCHDP-WD-VZR-RAOZ-16/93
|
Moddha Chickdair Saymachran road by BC at Ch.975-1227m
|
GCCP-2
|
raojan
|
|
0.40
|
|
|
25.31
|
|
0.00
|
|
|
|
0
|
|
|
|
|
430
|
GCHDP-WD-VZR-RAOZ-16/94
|
Raozan Mohammedpur Mohajan Bari Road by HBB at Ch. 00-94m & 246-366m
|
GCCP-2
|
raojan
|
|
0.25
|
|
|
5.50
|
M/S. M. R Cosntruction
|
5.50
|
|
08/02/2017
|
15/06/2017
|
100
|
|
|
|
|
431
|
GCHDP-WD-VZR-RAOZ-16/97
|
Pahartoli Shahadulla Kazibari road by HBB. Ch. 00-285m
|
GCCP-2
|
raojan
|
|
0.21
|
|
|
6.70
|
M/S. Salam & Brother's
|
6.69
|
|
22/03/2017
|
29/07/2017
|
100
|
|
|
|
|
432
|
GCHDP-WD-VZR-RAOZ-16/101
|
Tita Gazi road (East Guzra Ander manik Rahamania) by HBB. Ch.135-635m
|
GCCP-2
|
raojan
|
|
0.29
|
|
|
12.73
|
|
0.00
|
|
|
|
0
|
|
|
|
|
433
|
GCHDP-WD-VZR-RAOZ-16/104
|
Sarker Para road (Samiuddin Matabor Mosque-Sujar para) By HBB at Ch.200-700m
|
GCCP-2
|
raojan
|
|
0.50
|
|
|
11.94
|
|
0.00
|
|
|
|
0
|
|
|
|
|
434
|
GCHDP-WD-VZR-RAOZ-16/105
|
East Urkirchar Sawdagorpara Connecting (Mohahammed Taki, Al-Haz Najir Ahmed Bari) road By HBB at Ch.817-1770m
|
GCCP-2
|
raojan
|
|
0.50
|
|
|
28.90
|
M/S. Bizid Enterprise
|
30.33
|
|
16/08/2017
|
23/12/2017
|
100
|
|
|
|
|
435
|
GCHDP-WD-VZR-RAOZ-16/113
|
Baguan Panchkhine Nath para road by HBB. Ch.00-192m
|
GCCP-2
|
raojan
|
|
0.95
|
|
|
4.38
|
|
0.00
|
|
|
|
0
|
|
|
|
|
436
|
GCHDP-WD-VZR-RAOZ-16/118
|
Gohira Moha Kabi Nobin Sen Road By HBB at Ch. 120-412m
|
GCCP-2
|
raojan
|
|
0.19
|
|
|
6.69
|
M/S. J.A Enterprise
|
6.68
|
|
19/02/2017
|
26/06/2017
|
100
|
|
|
|
|
437
|
GCHDP-WD-VZR-RAOZ-16/139
|
Baguan Asarja Para oad by HBB at Ch. 00-214m
|
GCCP-2
|
raojan
|
|
0.29
|
|
|
6.01
|
M/S. Fabiha Enterprise
|
5.99
|
|
20/02/2017
|
30/11/2017
|
100
|
|
|
|
|
438
|
GCHDP-WD-VZR-RAOZ-16/58
|
Development of Binajuri Purna Chandra road By HBB at Ch.350-830m
|
GCCP-2
|
raojan
|
|
0.21
|
|
|
9.54
|
M/S. Pubali Traders
|
9.28
|
|
|
|
100
|
|
|
|
|
439
|
GCHDP-WD-VZR-RAOZ-16/12
|
Keotia road By HBB at Ch.1000-1200m.
|
GCCP-2
|
raojan
|
|
0.48
|
|
|
5.30
|
M/S. K. Alam Traders
|
5.30
|
|
28/02/2017
|
07/07/2017
|
100
|
|
|
|
|
440
|
GCHDP-WD-VZR-RAOZ-16/02;
|
Pachim Gahira Brick Field RHD-Mohammed Towkir hat GC (Ichapur road) By RCC at Ch. 340-995m.
|
GCCP-2
|
raojan
|
|
0.20
|
|
|
51.17
|
M/S. Fabiha Enterprise
|
50.99
|
|
03/05/2017
|
10/09/2017
|
100
|
|
|
|
|
441
|
GCHDP-WD-VZR-RAOZ-16/05;
|
Phartali R.D. Mohammada (Ram Dulal) road by RCC Ch. 2860-3679m
|
GCCP-2
|
raojan
|
|
0.66
|
|
|
54.31
|
M/S.I.S Trading
|
54.30
|
|
28/06/2017
|
05/11/2017
|
100
|
|
|
|
|
442
|
GCHDP-WD-VZR-RAOZ-16/06
|
Noapara Patia para road (Majamdar bari) By RCC Ch.00-450m
|
GCCP-2
|
raojan
|
|
0.82
|
|
|
20.06
|
M/S. Nipa Enterprise
|
25.77
|
|
22/05/2017
|
29/09/2017
|
100
|
|
|
|
|
443
|
GCHDP-WD-VZR-RAOZ-16/42
|
of Shahnager road by RCC Ch.00-85m & 670-920m
|
GCCP-2
|
raojan
|
|
0.54
|
|
|
22.71
|
M/S. Baizid Enterprise
|
22.65
|
|
04/05/2017
|
11/09/2017
|
100
|
|
|
|
|
444
|
GCHDP-WD-VZR-RAOZ-16/69
|
Chickdair Yeshain house road By RCC at Ch.00-500m
|
GCCP-2
|
raojan
|
|
0.34
|
|
|
31.40
|
M/S. Hasnain Syndicate.
|
31.40
|
|
16/08/2017
|
23/12/2017
|
100
|
|
|
|
|
445
|
GCHDP-WD-VZR-RAOZ-16/79
|
Pachim Gohira Buddha Behir (Santimoy Bihar) road by RCC at Ch.181-426m
|
GCCP-2
|
raojan
|
|
0.50
|
|
|
20.32
|
M/S Sayem Traders
|
20.31
|
|
12/06/2017
|
19/10/2017
|
100
|
|
|
|
|
446
|
GCHDP-WD-VZR-RAOZ-16/84
|
Hazi para Baro Mawlana road By RCC at Ch.00-78m & 579-631m
|
GCCP-2
|
raojan
|
|
0.25
|
|
|
8.48
|
M/S. Ramim & Brothers
|
8.40
|
|
25/04/2017
|
09/09/2017
|
100
|
|
|
|
|
447
|
GCHDP-WD-VZR-RAOZ-16/129
|
Janata Bank and Mosque connecting (Santirdip South Sartta road) road by RCC at Ch.350-448m
|
GCCP-2
|
raojan
|
|
0.13
|
|
|
5.26
|
M/S. S. M Trading
|
5.24
|
|
11/05/2017
|
18/09/2017
|
100
|
|
|
|
|
448
|
GCHDP-WD-VZR-RAOZ-16/26
|
Noajishpur north Fatanager road By RCC at Ch.510-610m
|
GCCP-2
|
raojan
|
|
0.10
|
|
|
7.78
|
M/S S. M. Trading
|
7.74
|
|
22/05/2017
|
29/09/2017
|
100
|
|
|
|
|
449
|
GCHDP-WD-VZR-RAOZ-16/133
|
Nayam Munshe bari road by RCC at Ch. 00-200m
|
GCCP-2
|
raojan
|
|
0.10
|
|
|
8.89
|
M/S M. A Traders
|
8.88
|
|
12/06/2017
|
19/10/2017
|
100
|
|
|
|
|
450
|
GCHDP-WD-VZR-RAOZ-16/29
|
Moulana Abdul Jalil road /Parinibash bihar road and Muktijuddha Sunil borua road at Ch.50-477m
|
GCCP-2
|
raojan
|
|
0.20
|
|
|
10.33
|
Sayma Thate Enterprise
|
10.32
|
|
28/06/2017
|
05/11/2017
|
100
|
|
|
|
|
451
|
GCHDP-WD-VZR-RAOZ-16/36
|
Ali Mohammad Chowdury road By HBB at Ch. 00-325m
|
GCCP-2
|
raojan
|
|
0.43
|
|
|
14.02
|
M/S. S. M Trading
|
13.98
|
|
22/05/2017
|
29/09/2017
|
100
|
|
|
|
|
452
|
GCHDP-WD-VZR-RAOZ-17/30
|
Abdul Slam School Road From Mogdai Link Road/Mazar Gate From Rupcand Nager road Last Protion and Munshi Bari road By HBB at Ch. 00-250m, 00-165m & 00-337m.
|
GCCP-2
|
raojan
|
|
0.33
|
|
|
14.02
|
Sayma Thate Enterprise
|
17.16
|
|
28/06/2017
|
05/11/2017
|
100
|
|
|
|
|
453
|
GCHDP-WD-VZR-RAOZ-17/51
|
Kagatia Motsha Heasery road by HBB Ch. 00-490m
|
GCCP-2
|
raojan
|
|
|
|
|
14.02
|
M/S Sayem Thate Enterprise
|
13.65
|
|
12/06/2017
|
19/10/2017
|
100
|
|
|
|
|
454
|
GCHDP-WD-VZR-RAOZ-17/62
|
Binajuri Ganoshree Road By HBB Ch.334-756m
|
GCCP-2
|
raojan
|
|
0.49
|
|
|
14.02
|
M/S. Pubali Traders
|
8.35
|
|
28/06/2017
|
05/11/2017
|
100
|
|
|
|
|
455
|
GCHDP-WD-VZR-RAOZ-17/111
|
Baguan Guccy Das Para road by HBB Ch.00-300m.
|
GCCP-2
|
raojan
|
|
0.42
|
|
|
14.02
|
M/S. Fabiha Enterprise
|
6.83
|
|
06/07/2017
|
13/11/2017
|
100
|
|
|
|
|
456
|
GCHDP-WD-VZR-RAOZ-17/112
|
Braman Das Para Jala Kumare road by HBB Ch. 00-300m
|
GCCP-2
|
raojan
|
|
0.30
|
|
|
14.02
|
M/S. Fabiha Enterprise
|
6.83
|
|
06/07/2017
|
13/11/2017
|
100
|
|
|
|
|
457
|
GCHDP-WD-VZR-CHT-RAOZ-STR-17/65
|
Construction of 13.00m Long RCC Slab Bridge at Rangamati Road to West Raozan Near Pink City Khal at Ch.5m.
|
GCCP-2
|
raojan
|
|
0.30
|
|
|
95.17
|
M/S. Hoque & Brothers
|
95.15
|
|
07/08/2017
|
09/08/2018
|
100
|
|
|
|
|
458
|
GCHDP-WD-VZR-CHT-RAOZ- 17/127
|
Forest Office Road By RCC at Ch: 00-201m.
|
GCCP-2
|
raojan
|
|
|
|
|
25.48
|
M/S. Hoque & Brothers
|
44.43
|
|
07/08/2017
|
14/12/2017
|
100
|
|
|
|
|
459
|
GCHDP-WD-VZR-RAOZ-17/10
|
Development of Chickdair Shaheb Bari road By 25mm Carpeting 2000-2500m.
|
GCCP-2
|
raojan
|
|
0.20
|
|
|
27.96
|
M/S.Bizid Enterprise
|
27.94
|
|
09/08/2017
|
16/12/2017
|
100
|
|
|
|
|
460
|
GCHDP-WD-VZR-RAOZ-17/03
|
Development of Nazir Ahmed Road By HBB at Ch. 00-732m.
|
GCCP-2
|
raojan
|
|
0.50
|
|
|
23.75
|
M/S. M.R Construction
|
23.75
|
|
02/11/2017
|
09/03/2018
|
100
|
|
|
|
|
461
|
GCHDP-WD-VZR-RAOZ-17/81
GCHDP-WD-VZR-RAOZ-17/18
ID No. 415745634
|
Development of Raojan Sultan Auliya Road By HBB at Ch. 1500-1970m,
|
GCCP-2
|
raojan
|
|
0.73
|
|
|
15.30
|
M/S.K. Alam Traders
|
15.29
|
|
09/08/2017
|
16/12/2017
|
100
|
|
|
|
|
462
|
GCHDP-WD-VZR-RAOZ-17/18
|
Development of Mulla Miskin Shah Road By HBB at Ch. 492-720m.
|
GCCP-2
|
raojan
|
|
0.47
|
|
|
7.52
|
M/S. Salam & Brothers
|
7.50
|
|
08/08/2017
|
15/12/2017
|
100
|
|
|
|
|
463
|
GCHDP-WD-VZR-RAOZ-17/19
|
Development of Kadalpur Miajan Hazi Bari Road By HBB at Ch. 14-250m.
|
GCCP-2
|
raojan
|
|
0.23
|
|
|
7.57
|
M/S. Salam & Brother’s
|
7.54
|
|
26/09/2017
|
03/02/2018
|
100
|
|
|
|
|
464
|
GCHDP-WD-VZR-RAOZ-17/98
|
Development of R.D (Ram Dulal) Road By HBB at Ch.550-850m.
|
GCCP-2
|
raojan
|
|
0.24
|
|
|
9.69
|
|
0.00
|
|
|
|
0
|
|
|
|
|
465
|
GCHDP-WD-VZR-RAOZ-17/99
|
R.D Mohamadia Road-Pahartali Road By HBB at Ch. 00-270m.
|
GCCP-2
|
raojan
|
|
0.30
|
|
|
8.66
|
M/S. M. R. Construction
|
9.46
|
|
|
|
100
|
|
|
|
|
466
|
GCHDP-WD-VZR-RAOZ-17/108
|
Noapara Surjan Sen Road By HBB at Ch.00-280m.
|
GCCP-2
|
raojan
|
|
0.27
|
|
|
9.10
|
M/S. Pubali Traders
|
9.10
|
|
06/09/2017
|
13/01/2018
|
100
|
|
|
|
|
467
|
GCHDP-WD-VZR-RAOZ-17/22
|
Kadalpur Alam Bari Road By HBB at Ch. 00-324m.
|
GCCP-2
|
raojan
|
|
0.28
|
|
|
10.37
|
M/S. Salam & Brother’s
|
10.35
|
|
26/09/2017
|
03/02/2018
|
0
|
|
|
|
|
468
|
GCHDP-WD-VZR-RAOZ-17/52
|
Kadalpur Kalakatar Para Road By HBB at Ch.00-324m.
|
GCCP-2
|
raojan
|
|
0.32
|
|
|
10.40
|
M/S. Salam & Brother's
|
10.38
|
|
21/09/2017
|
28/01/2018
|
100
|
|
|
|
|
469
|
GCHDP-WD-VZR-RAOZ-17/55
|
Kadalpur Jamader Bari Road By HBB at Ch. 00-300m.
|
GCCP-2
|
raojan
|
|
0.32
|
|
|
9.69
|
M/S. Salam & Brother's
|
9.67
|
|
26/09/2017
|
03/02/2018
|
100
|
|
|
|
|
470
|
GCHDP-WD-VZR-RAOZ-17/91
|
Barub Kundu Road By HBB at Ch. 610-980m.
|
GCCP-2
|
raojan
|
|
0.30
|
|
|
12.00
|
M/S. Chowdhury Enterprise
|
11.96
|
|
29/01/2018
|
05/06/2018
|
100
|
|
|
|
|
471
|
GCHDP-WD-VZR-RAOZ-17/74
|
Development of Jarul tala (Raojan Section-2 road-Lalangra road) Road By HBB at Ch. 00-320m.
|
GCCP-2
|
raojan
|
|
0.37
|
|
|
9.15
|
M/S. Mithila Associates
|
9.14
|
|
03/08/2017
|
10/12/2017
|
100
|
|
|
|
|
472
|
GCHDP-WD-VZR-RAOZ-17/64
|
Edilpur Shakomoni Beheri (Binajuri) Road By HBB at Ch.612-960m.
|
GCCP-2
|
raojan
|
|
0.32
|
|
|
12.94
|
M/S. Pubali Traders
|
12.93
|
|
|
|
100
|
|
|
|
|
473
|
GCHDP-WD-VZR-RAOZ-17/80
|
Raojan Kulal Para Road By HBB at Ch. 00-425m.
|
GCCP-2
|
raojan
|
|
0.35
|
|
|
14.29
|
M/S. K. AlamTraders
|
14.29
|
|
07/09/2017
|
14/01/2018
|
100
|
|
|
|
|
474
|
GCHDP-WD-VZR-RAOZ-17/44
|
Abul Khayer Munshi Road By RCC at Ch. 00-248m.
|
GCCP-2
|
raojan
|
|
0.43
|
|
|
16.57
|
M/S. S. M. Trading
|
16.54
|
|
24/09/2017
|
28/02/2018
|
100
|
|
|
|
|
475
|
GCHDP-WD-VZR-RAOZ-17/45
|
Noajishpur Hazi Azizur Rahman Chowdury Road By HBB at Ch. 00-390m.
|
GCCP-2
|
raojan
|
|
0.25
|
|
|
12.85
|
M/S.M.R Construction.
|
12.84
|
|
28/08/2017
|
04/01/2018
|
100
|
|
|
|
|
476
|
GCHDP-WD-VZR-RAOZ-17/28
|
Development of Fatanagor Ashad Ali Munshi Road By HBB at Ch. 00-235m.
|
GCCP-2
|
raojan
|
|
0.39
|
|
|
8.34
|
M/S. S. M. Trading
|
8.31
|
|
25/04/2018
|
02/09/2018
|
100
|
|
|
|
|
477
|
GCHDP-WD-VZR-RAOZ-17/47
|
Fatehnagor Abdullahpur Road By HBB at Ch. 00-239m.
|
GCCP-2
|
raojan
|
|
0.24
|
|
|
7.75
|
M/S. S.M Trading.
|
7.73
|
|
03/08/2017
|
10/12/2017
|
100
|
|
|
|
|
478
|
GCHDP-WD-VZR-RAOZ-17/85
|
Mukbul Shah (Sultanpur Hazi Para) By HBB at Ch. 447-732m.
|
GCCP-2
|
raojan
|
|
0.24
|
|
|
10.52
|
M/S. M.R Construction
|
10.52
|
|
05/12/2017
|
12/04/2018
|
100
|
|
|
|
|
479
|
GCHDP-WD-VZR-RAOZ-17/ 50
|
Uttar Guzra Biswash Prymari School (East Guzra) Road By HBB at Ch. 00-320m.
|
GCCP-2
|
raojan
|
|
0.29
|
|
|
12.58
|
M/S. M. A Traders
|
12.58
|
|
22/08/2017
|
29/01/2018
|
100
|
|
|
|
|
480
|
GCHDP-WD-VZR-RAOZ-17/09
|
Nokul Moholder Bari to Noapara Section-1 Road By HBB at Ch. 500-800m.
|
GCCP-2
|
raojan
|
|
0.32
|
|
|
14.59
|
M/S. Samiun Enterprise
|
15.97
|
|
|
|
0
|
|
|
|
|
481
|
GCHDP-WD-VZR-RAOZ-17/59
|
Development of Bankeem Chandra (Binajuri) Road By HBB at Ch. 00-220m.
|
GCCP-2
|
raojan
|
|
0.30
|
|
|
7.97
|
M/S. Iqbal & Brothers
|
7.97
|
|
21/08/2017
|
28/12/2017
|
100
|
|
|
|
|
482
|
GCHDP-WD-VZR-RAOZ-17/46
|
Development of Mina Akbar Road By RCC at Ch. 00-750m.
|
GCCP-2
|
raojan
|
|
0.22
|
|
|
39.89
|
M/S. S.M Trading.
|
39.86
|
|
03/08/2017
|
10/12/2017
|
100
|
|
|
|
|
483
|
GCHDP-WD-VZR-RAOZ-17/ 57
|
Development of Binajuri Nobin Mohajan Road By HBB at Ch. 1009-1272m.
|
GCCP-2
|
raojan
|
|
0.75
|
|
|
9.04
|
M/S.Bizid Enterprise
|
8.83
|
|
09/08/2017
|
16/12/2017
|
100
|
|
|
|
|
484
|
GCHDP-WD-VZR-RAOZ-17/43
|
Development of Noajishpur Yousuf Chowdury Road By HBB at Ch. 00-355m.
|
GCCP-2
|
raojan
|
|
0.26
|
|
|
12.03
|
M/S. M.R Construction
|
12.03
|
|
02/08/2017
|
09/12/2017
|
100
|
|
|
|
|
485
|
GCHDP-WD-VZR-RAOZ-17/83
|
Development of Pachim Gohira Azim Habilder Bari Road By BC at Ch. 00-250m.
|
GCCP-2
|
raojan
|
|
0.36
|
|
|
13.99
|
M/S Atik Traders
|
13.99
|
|
17/09/2017
|
24/01/2018
|
100
|
|
|
|
|
486
|
GCHDP-WD-VZR-RAOZ-17/01
|
Development of Hafez Bazlur Rahman (R&H) near At Gowrisankar hat GC to Raojan Noapara Section-1 (R&H) via Ragunondon Hat (Rawali Road-1) By BC at Ch.4180-4880m.
|
GCCP-2
|
raojan
|
|
0.25
|
|
|
39.69
|
|
0.00
|
|
|
|
0
|
|
|
|
|
487
|
GCHDP-WD- VZR -RAOZ-17/27
|
Zinath Ali Munshi & Mohammed Ali Munshi road By HBB at Ch. 00-260m.
|
GCCP-2
|
raojan
|
|
0.70
|
|
|
8.80
|
M/S. S. M. Trading
|
8.74
|
|
07/12/2017
|
14/04/2018
|
100
|
|
|
|
|
488
|
GCHDP-WD-VZR-RAOZ-17/34
|
Sahid Eskander Bari Road by HBB at Ch.60-734m.
|
GCCP-2
|
raojan
|
|
0.26
|
|
|
21.79
|
|
0.00
|
|
|
|
0
|
|
|
|
|
489
|
GCHDP/WD/ /VZR/ CHT-RAOZ-18/35
|
Mobarek khil Jame Mosque Road By RCC at Ch. 509-709m.
|
GCCP-2
|
raojan
|
|
0.67
|
|
|
14.65
|
M/S. Fabiha Enterprise
|
14.60
|
|
|
|
100
|
|
|
|
|
490
|
GCHDP/WD/ /VZR/ CHT-RAOZ -18/125
|
Shil Bari Road By HBB at Ch. 218-355m.
|
GCCP-2
|
raojan
|
|
0.20
|
|
|
5.91
|
M/S. K. Alam Traders
|
5.91
|
|
|
|
0
|
|
|
|
|
491
|
GCHDP/WD/ /VZR/ CHT-RAOZ -18/33
|
Kabir Ahmed Talukder (Gohira) Road by RCC at Ch.2200-2400m.
|
GCCP-2
|
raojan
|
|
0.14
|
|
|
14.78
|
M/S.S. M Trading
|
14.75
|
|
|
|
100
|
|
|
|
|
492
|
GCHDP/WD/ /VZR/ CHT-RAOZ -18/78
|
Gohira Ismail Road By RCC at Ch.850-1200m.
|
GCCP-2
|
raojan
|
|
0.20
|
|
|
39.86
|
M/S.Sayem Trading
|
39.86
|
|
|
|
0
|
|
|
|
|
493
|
GCHDP/WD/ /VZR/ CHT-RAOZ -18/34
|
Shahid Eskander Bari Road By HBB at Ch.60-734m.
|
GCCP-2
|
raojan
|
|
0.35
|
|
|
23.73
|
M/S. Hoque & Brothers
|
24.91
|
|
|
|
80
|
|
|
|
|
494
|
GCHDP/WD/ /VZR/ CHT-RAOZ -18/36
|
Yar Mohammad Chowdury Road By BC at Ch.00-460m.
|
GCCP-2
|
raojan
|
|
0.67
|
|
|
30.53
|
|
0.00
|
|
|
|
0
|
|
|
|
|
495
|
GCHDP-WD-VZR-CHT- RAOZ-EX-17/141
|
Paschim Baruapara Student Road By HBB at Ch.CH.00-395m.
|
GCCP-2
|
raojan
|
|
0.46
|
|
|
26.75
|
M/S. Salam & Brother’s
|
26.73
|
|
|
|
0
|
|
|
|
|
496
|
GCHDP-WD-VZR-CHT- RAOZ-EX-18/142
|
Development of Kadalpur Parir Dighirpar Pachim Kadalpur Barua Para Road Parir Dighirpar Santo Babu Bari Road By RCC at Ch. 00-1003m.
|
GCCP-2
|
raojan
|
|
0.40
|
|
|
107.07
|
M/S. Erfan Enterprise
|
108.18
|
|
|
|
90
|
|
|
|
|
497
|
GCHDP-WD-VZR-CHT- RAOZ-EX-18/143
|
Development of Kadalpur Alam Bari Road By RCC at Ch.00-271m.
|
GCCP-2
|
raojan
|
|
1.00
|
|
|
37.72
|
M/S. Fabiha Enterprise
|
39.59
|
|
03/06/2018
|
05/10/2018
|
100
|
|
|
|
|
498
|
GCHDP-WD-VZR–CHT-SAND–MAIN-18/01
|
DB Road (Fokir Go Tematha) to Embamkment via Sheberhat G.C, Noahat (Pachuya Road) Road By RCC at Ch. 305–740m,1105-1170m&1500-1700m.
|
GCCP-2
|
sandwip
|
|
|
|
|
0.00
|
M/S. Abul Mohsin
|
26.38
|
|
|
|
0
|
|
|
|
|
499
|
GCHDP-WD-VZR–CHT-SAND–MAIN-18/02
|
CC Cenrer Road (H/O Moyna) To RHD Road (Dip Bandu Mustafizur Rahaman High School Road) By RCC at ch.150-450m,550-710m,900-950m,1100-1140m &2340-2520m.
|
GCCP-2
|
sandwip
|
|
0.70
|
|
|
27.75
|
M/S. AT Enterprise
|
26.28
|
|
|
|
100
|
|
|
|
|
500
|
GCHDP-WD-VZR–CHT-SAND–MAIN-18/03
|
Choyakhali Ferry ghat To RHD road (H/O Moulana Emdad) Via Sholoshore Bazar. (Choyakhali Ferry ghat road ) Road By RCC at ch.150-850m,1150-1225m&1500-1700m.
|
GCCP-2
|
sandwip
|
|
0.73
|
|
|
27.75
|
M/S. Nowrin & Brothers
|
38.71
|
|
|
|
0
|
|
|
|
|
501
|
GCHDP-WD-UNR-CHT-SAND -16/03
|
Palishar Road By RCC at Ch. Ch. 00-850m.
|
GCCP-2
|
sandwip
|
|
|
|
|
0.00
|
M/S Globe Enterprise.
|
48.43
|
|
31/01/2016
|
04/04/2017
|
100
|
|
|
|
|
502
|
GCHDP-WD-UNR-CHT-SAND -16/01
|
Circular (Sarikati UP HQ – Bangla Bazar) Road By RCC at Ch.1000m-1700m.
|
GCCP-2
|
sandwip
|
|
0.85
|
|
|
56.00
|
M/S.Lucky Enterprise
|
41.93
|
|
06/03/2017
|
13/07/2017
|
100
|
|
|
|
|
503
|
GCHDP-WD-UNR-CHT-SAND -17/04
|
Embankment to Circular Road Via Adarsho Para GPS & Shiber Hat GC (Abul Khair Khan Satgaria Road) Road By RCC at Ch.4140-4970m.
|
GCCP-2
|
sandwip
|
|
0.70
|
|
|
55.00
|
Md.Zakir Hossain
|
51.62
|
|
|
|
0
|
|
|
|
|
504
|
GCHDP-WD-VZR-CHT-SAND -17/01
|
Harispur UP to Embankment Via Dwipallo GPS RHD (Maddya Bauria Road) Road By RCC at Ch.1400-1825m.
|
GCCP-2
|
sandwip
|
|
|
|
|
0.00
|
M/S. Fatema Construction
|
27.24
|
|
|
|
100
|
|
|
|
|
505
|
GCHDP-WD-VZR-CHT-SAND -16/04
|
Chanu Meah Hazi Road By RCC at Ch: 350-765m.
|
GCCP-2
|
sandwip
|
|
0.43
|
|
|
28.89
|
M/S H.K Traders.
|
19.83
|
|
03/11/2016
|
10/03/2017
|
100
|
|
|
|
|
506
|
GCHDP-WD-VZR-CHT-SAND -16/05
|
Omed Ali Road By RCC at Ch: 150-565m.
|
GCCP-2
|
sandwip
|
|
0.42
|
|
|
22.00
|
M/S.Zakir Hossain
|
22.21
|
|
29/05/2016
|
05/10/2016
|
100
|
|
|
|
|
507
|
GCHDP-WD-VZR-CHT-SAND -16/14
|
Gulataki (Gashua Sontospur Border M. Obaidur Haque MP Road) Road By RCC at Ch: 200-615m.
|
GCCP-2
|
sandwip
|
|
0.42
|
|
|
22.00
|
M/S.The Engineers Syndicate.
|
22.22
|
|
05/05/2016
|
12/09/2016
|
100
|
|
|
|
|
508
|
GCHDP-WD-VZR-CHT-SAND -16/15
|
Cross Road By RCC at Ch: 3965-4380m.
|
GCCP-2
|
sandwip
|
|
0.42
|
|
|
22.00
|
M/S.S.R Enterprise
|
22.21
|
|
29/05/2016
|
05/05/2017
|
100
|
|
|
|
|
509
|
GCHDP-WD-VZR-CHT-SAND -16/17
|
Bagai Road By RCC at Ch: 200-615m.
|
GCCP-2
|
sandwip
|
|
0.42
|
|
|
22.00
|
M/S. Akash Enterprise
|
20.01
|
|
19/07/2017
|
26/11/2017
|
100
|
|
|
|
|
510
|
GCHDP-WD-VZR-CHT-SAND -16/02
|
Gasua-Bauria Border Road (East Part upto Gasua Feri Ghat road Md. Zamalul Mowla Road) By RCC at Ch. 00-300m, 2317-2517m & 4645-4800m
|
GCCP-2
|
sandwip
|
|
0.42
|
|
|
22.00
|
M/S.Fathema Construction
|
30.77
|
|
|
|
100
|
|
|
|
|
511
|
GCHDP-WD-VZR-CHT-SAND -16/03
|
Maitbanga-Mogdhara Ferrig Ghat Road By RCC at Ch. 1600-2010m.
|
GCCP-2
|
sandwip
|
|
0.66
|
|
|
35.34
|
M/S Globe Enterprise.
|
18.59
|
|
31/10/2016
|
07/04/2017
|
0
|
|
|
|
|
512
|
GCHDP-WD-VZR-CHT-SAND -16/12
|
solaimanis Road By RCC at Ch. Ch. 1200-1615m
|
GCCP-2
|
sandwip
|
|
0.41
|
|
|
22.00
|
M/S Globe Enterprise
|
19.27
|
|
31/01/1900
|
07/04/2017
|
100
|
|
|
|
|
513
|
GCHDP-WD-VZR-CHT-SAND -16/16
|
Sikder Road By RCC at Ch. 00-415m.
|
GCCP-2
|
sandwip
|
|
0.42
|
|
|
22.00
|
M/S Nazrul Islam & Brothers
|
19.40
|
|
19/10/2016
|
26/03/2017
|
100
|
|
|
|
|
514
|
GCHDP-WD-VZR-CHT-SAND -16/18
|
Fakirnama Road By RCC at Ch. 00-410m
|
GCCP-2
|
sandwip
|
|
0.42
|
|
|
22.00
|
M/S Shiblu & Brothers
|
19.38
|
|
03/11/2016
|
10/04/2017
|
100
|
|
|
|
|
515
|
GCHDP-WD-VZR-CHT-SAND -16/19
|
Pachuya Road By RCC at Ch. Ch. 1200-1615m.
|
GCCP-2
|
sandwip
|
|
0.41
|
|
|
22.00
|
M/S. Munna Enterprise
|
20.17
|
|
31/07/2017
|
07/01/2018
|
100
|
|
|
|
|
516
|
GCHDP-WD-VZR-CHT-SAND -16/06
|
Kalapania Eidgha Road By RCC at Ch. 1000-1415m
|
GCCP-2
|
sandwip
|
|
0.42
|
|
|
22.00
|
M/S.The Engineers Syndicate
|
18.90
|
|
|
|
100
|
|
|
|
|
517
|
GCHDP-WD-VZR-CHT-SAND -16/09
|
Bauria Cross Road By RCC at Ch. 2585m-3000m.
|
GCCP-2
|
sandwip
|
|
0.41
|
|
|
22.00
|
M/S.Rasael and Brothers
|
19.67
|
|
|
|
100
|
|
|
|
|
518
|
GCHDP-WD-VZR-CHT-SAND -16/13
|
G.K & College Road By RCC at Ch. 00m-415m.
|
GCCP-2
|
sandwip
|
|
0.42
|
|
|
22.00
|
M/S. Lucky Enterprise
|
19.99
|
|
12/06/2017
|
19/10/2017
|
100
|
|
|
|
|
519
|
GCHDP-WD-VZR-CHT-SAND -16/10
|
Bosidia Road By RCC at Ch. 1015m-1430m.
|
GCCP-2
|
sandwip
|
|
0.42
|
|
|
22.00
|
M/S.Rasael and Brothers
|
19.67
|
|
28/02/2017
|
07/07/2017
|
100
|
|
|
|
|
520
|
GCHDP-WD-VZR-CHT-SAND -16/07
|
Afsar Uddin Road By RCC at Ch. 475m-890m.
|
GCCP-2
|
sandwip
|
|
0.42
|
|
|
22.00
|
M/S. Lucky Enterprise
|
19.99
|
|
12/06/2017
|
19/10/2017
|
100
|
|
|
|
|
521
|
GCHDP-WD-FRB–CHT-SATK–MAIN-18/01
|
Charati-Khoderhat-Moulavir Dokan-Bazalia-Bomang Hat-Noya hat Road By Dense Carpeting at ch.21000-23000m
|
GCCP-2
|
satkania
|
|
|
|
|
0.00
|
M. S. Nirman Sangstha
|
36.36
|
|
|
|
0
|
|
|
|
|
522
|
GCHDP-WD-VZR–CHT-SATK –MAIN-17/01
|
Ali Ahmed Paran Hori Road (Jafar Ahmed Chowdhury Road) By Dense Carpeting at Ch. 00-1230m.
|
GCCP-2
|
satkania
|
|
2.00
|
|
|
40.00
|
M/S. Suborna Enterprise
|
25.43
|
|
31/05/2017
|
07/09/2017
|
100
|
|
|
|
|
523
|
GCHDP-WD-FRB-CHT-SATK -16/01
|
Gatiadanga-Deodighi-Mirzakhil Road. (From RHD #146) Road By BC at Ch: 7552m-8200m.
|
GCCP-2
|
satkania
|
|
|
|
|
0.00
|
M/S.Blue Bird.
|
50.58
|
|
11/07/2016
|
18/01/2017
|
100
|
|
|
|
|
524
|
GCHDP-WD-FRB-CHT-SATK -16/03
|
Dewan Hat GC-Tayari Hat GC (Lohagora) Satkania Portion By BC at Ch: 6850m-7950m
|
GCCP-2
|
satkania
|
|
0.65
|
|
|
63.00
|
M/S.Alam Enterprise
|
51.95
|
|
13/07/2016
|
20/01/2017
|
100
|
|
|
|
|
525
|
GCHDP-WD-FRB-CHT-SATK -16/05
|
Karani Hat GC-Khagoria Bhor Bazar GC. Road By BC at Ch: 00m-2360m.
|
GCCP-2
|
satkania
|
|
1.10
|
|
|
117.00
|
M/S.Tohid & Brothers
|
188.99
|
|
13/07/2016
|
20/11/2016
|
100
|
|
|
|
|
526
|
GCHDP-WD-FRB-CHT-SATK -16/07
|
Nalua-Satkania Road via Nalua Hadar Khal Bridge at 1.0 Km & Gatiadanga High School (from Ch.8.0 Km of Charati-Khoderhat-Noyahat-Bazalia (From RHD #143) Road By BC at Ch: 4620m-6156m.
|
GCCP-2
|
satkania
|
|
2.36
|
|
|
200.00
|
M/S. The Engineering Syndicate
|
82.17
|
|
09/10/2016
|
16/08/2016
|
100
|
|
|
|
|
527
|
GCHDP-WD-UNR-CHT-SATK -16/01
|
Amilaish U.P-Kanchana U.P.Via Hilimili Road By HBB at Ch: 2435m-3040m.
|
GCCP-2
|
satkania
|
|
|
|
|
0.00
|
M/S.Chowdhury International
|
15.89
|
|
10/05/2016
|
17/09/2016
|
100
|
|
|
|
|
528
|
GCHDP-WD-UNR-CHT-SATK -16/02
|
Eochia U.P- Jut Pokuria Bazar Road By HBB at Ch: 00m-597m.
|
GCCP-2
|
satkania
|
|
0.61
|
|
|
25.00
|
M/S.Shafi Enterprise.
|
14.48
|
|
13/07/2016
|
20/11/2016
|
100
|
|
|
|
|
529
|
GCHDP-WD-UNR-CHT-SATK -16/11
|
Kanchana U.P.-Monu Fakir Hat Road By HBB at Ch: 630m-1488m.
|
GCCP-2
|
satkania
|
|
0.60
|
|
|
16.00
|
M/S.Shafi Enterprise
|
21.98
|
|
13/07/2016
|
20/11/2016
|
100
|
|
|
|
|
530
|
GCHDP-WD-UNR-CHT-SATK -16/17
|
Khagoria U.P.-Nur Markat Via Mather Khil Road By HBB at Ch: 00m-500m.
|
GCCP-2
|
satkania
|
|
0.86
|
|
|
23.00
|
M/S.Rima Construction
|
16.04
|
|
30/06/2016
|
07/11/2016
|
100
|
|
|
|
|
531
|
GCHDP-WD-UNR-CHT-SATK -16/14
|
Sodaha U.P-Kaliaish U.P-Master Hat Via Keocia. Road By BC at Ch:00m-764m.
|
GCCP-2
|
satkania
|
|
0.50
|
|
|
16.00
|
Md.Rima Construction.
|
33.96
|
|
06/11/2016
|
13/04/2017
|
70
|
|
|
|
|
532
|
GCHDP-WD-UNR-CHT-SATK -16/15
|
Keochia U.P-Bajalia U.P Road By HBB at Ch:6015m-6650m & 7009-7100m.
|
GCCP-2
|
satkania
|
|
0.76
|
|
|
36.00
|
Md.Habibur Rahman.
|
22.48
|
|
08/11/2016
|
15/04/2017
|
100
|
|
|
|
|
533
|
GCHDP-WD-UNR-CHT-SATK-16/05
|
Demsha U.P.-Gholar Ghat Via Jut Pokuri Bazar Road By HBB at Ch.1600-1965m
|
GCCP-2
|
satkania
|
|
0.73
|
|
|
25.00
|
M/S. Rima Construction
|
9.79
|
|
26/12/2016
|
02/05/2017
|
100
|
|
|
|
|
534
|
GCHDP-WD-UNR-CHT-SATK -16/10
|
Sadha U.P-Shamadiapukur Bazar Road By BC at Ch. 443-1107m)
|
GCCP-2
|
satkania
|
|
0.37
|
|
|
20.00
|
Md.Chowdhury International
|
30.97
|
|
07/11/2016
|
14/03/2017
|
100
|
|
|
|
|
535
|
GCHDP-WD-UNR-CHT-SATK -16/12
|
Bomang Hat-Sodaha U.P Via Mahalia Road.(Md. Abul Hossain Chowdhury road) By HBB at Ch. 6448-7011m)
|
GCCP-2
|
satkania
|
|
0.63
|
|
|
33.00
|
Md.Habibur Rahman
|
14.47
|
|
08/11/2016
|
15/03/2017
|
100
|
|
|
|
|
536
|
|
|
GCCP-2
|
satkania
|
|
|
|
|
0.00
|
|
0.00
|
|
|
|
0
|
|
|
|
|
537
|
GCHDP-WD-VZR-CHT-SATK -16/01
|
Kalipur Dhala Road.(Morhoum Allama Fazlullah) By HBB at Ch: 2020m-2620m.
|
GCCP-2
|
satkania
|
|
|
|
|
0.00
|
M/S.Kashem Brothers
|
14.75
|
|
15/05/2016
|
22/09/2016
|
100
|
|
|
|
|
538
|
GCHDP-WD-VZR-CHT-SATK -16/02
|
Bichinna Para Ukhiyan kul Road By HBB at Ch: 100m-726m.
|
GCCP-2
|
satkania
|
|
0.60
|
|
|
16.00
|
M/S.Rima Construction
|
14.45
|
|
25/05/2016
|
01/10/2016
|
100
|
|
|
|
|
539
|
GCHDP-WD-VZR-CHT-SATK -16/03
|
Khordo Keyochia Primary School Road By HBB at Ch: 30m-659m
|
GCCP-2
|
satkania
|
|
0.63
|
|
|
16.00
|
M/S.Rima Construction
|
14.45
|
|
25/05/2016
|
01/10/2016
|
100
|
|
|
|
|
540
|
GCHDP-WD-VZR-CHT-SATK -16/04
|
Sha Monsuria Road By BC at Ch: 00m-581m
|
GCCP-2
|
satkania
|
|
0.63
|
|
|
16.00
|
M/S.Chowdhury International
|
27.33
|
|
13/07/2016
|
20/11/2016
|
100
|
|
|
|
|
541
|
GCHDP-WD-VZR-CHT-SATK -16/05
|
Choto Hatya Engineer Zia Road By BC at Ch: 00m-219m & 294m-660m.
|
GCCP-2
|
satkania
|
|
0.58
|
|
|
28.00
|
M/S.Kashem Brothers
|
26.73
|
|
21/06/2016
|
28/10/2016
|
100
|
|
|
|
|
542
|
GCHDP-WD-VZR-CHT-SATK -16/08
|
Azimpur Road By HBB at Ch. 00-880m)
|
GCCP-2
|
satkania
|
|
0.59
|
|
|
28.00
|
Md.Habibur Rahman.
|
23.09
|
|
08/11/2016
|
15/03/2017
|
100
|
|
|
|
|
543
|
GCHDP-WD-VZR-CHT-SATK -18/06
|
Rampur Madrasha sikder para Road By HBB at Ch.00-600m.
|
GCCP-2
|
satkania
|
|
0.88
|
|
|
28.00
|
M/S. ADS Builders
|
21.23
|
|
|
|
100
|
|
|
|
|
544
|
GCHDP-WD-VZR-CHT-SATK -18/07
|
Development of Dharmapur Alamgir Govt. Prymari School - Kundukul Sadu dokan Dharmapur Dabar Sharif road Fakirpara Khundu Khul road By HBB at Ch.165-665m.
|
GCCP-2
|
satkania
|
|
0.60
|
|
|
16.50
|
Makka Bilders
|
18.28
|
|
|
|
0
|
|
|
|
|
545
|
GCHDP-WD-VZR-CHT- SATK-18/09
|
Freedom Fighter Jalil Box Road (Ali Ahmed Chowdhury Road) By HBB at Ch.00-500m.
|
GCCP-2
|
satkania
|
|
0.50
|
|
|
16.50
|
M/S. A. K Chowdhury Enterprise
|
17.86
|
|
|
|
0
|
|
|
|
|
546
|
GCHDP-WD-VZR-CHT-SATK-STR –EX-18/10
|
Construction of 3-Vent 4.5X4.5m RCC Box Culvert of Isamoti Jugipara Road on Isamoti Khal at Ch: 975m.
|
GCCP-2
|
satkania
|
|
0.50
|
|
|
18.81
|
M/S. Shah Amanat Trading
|
33.70
|
|
|
|
0
|
|
|
|
|
547
|
GCHDP-WD-FRB –CHT-SITA-MAIN -16/02
|
Habib Ahamed Chowdhury Road By Dense Carpeting at Ch. 23850–27463m.
|
GCCP-2
|
sitakunda
|
|
|
|
|
0.00
|
Md. Omar Faruk
|
67.57
|
|
18/05/2016
|
25/09/2016
|
100
|
|
|
|
|
548
|
GCHDP-WD-UZR-CHT- SITA-STR-18/02
|
Construction of 30.00m Long PC Girder Bridge on Habib Ahmed Chowdhury Road at Ch.26900m, .
|
GCCP-2
|
sitakunda
|
|
|
|
|
100.00
|
M/S. Nipa Enterprise
|
189.27
|
|
|
|
0
|
|
|
|
|
549
|
GCHDP-WD--CHT- SITH-GC-18/01
|
Mirer Hat / Growth Center.
|
GCCP-2
|
sitakunda
|
|
|
|
|
26.00
|
M/S. Nahian Enterprise
|
47.50
|
|
|
|
0
|
|
|
|
|
550
|
GCHDP-WD-VZR-CHT-SITA -16/02
|
Tarun Samiti Road By HBB at Ch: 332-747m.
|
GCCP-2
|
sitakunda
|
|
|
|
|
0.00
|
M/S Murad & Sons.
|
14.62
|
|
07/11/2016
|
15/05/2017
|
100
|
|
|
|
|
551
|
GCHDP-WD-VZR-CHT-SITA -18/07
|
Mahmudabad Road By HBB at Ch: 418-773m.
|
GCCP-2
|
sitakunda
|
|
0.40
|
|
|
13.40
|
M/S. Joynal & Brothers
|
14.07
|
|
|
|
0
|
|
|
|
|
552
|
GCHDP-WD-VZR-CHT-SITA-17/22.
|
Development of Markentail Bank road By HBB at Ch. 00-500m
|
GCCP-2
|
sitakunda
|
|
0.40
|
|
|
13.40
|
|
0.00
|
|
|
|
0
|
|
|
|
|
553
|
GCHDP-WD-VZR-CHT-SITA-17/23.
|
Development of Motiar Rhaman Sarang road By HBB at Ch. 00-232m.
|
GCCP-2
|
sitakunda
|
|
0.50
|
|
|
16.65
|
M/S. Joynal & Brothers
|
8.41
|
|
15/11/2017
|
22/03/2018
|
100
|
|
|
|
|
554
|
GCHDP-WD-VZR-CHT-SITA-17/08.
|
Development of Niagazi road By HBB at Ch. 610-800m.
|
GCCP-2
|
sitakunda
|
|
0.23
|
|
|
7.66
|
|
0.00
|
|
|
|
0
|
|
|
|
|
555
|
GCHDP-WD-VZR-CHT-SITA-17/11.
|
Development of Nurur Rahman By HBB at Ch. 00-325m.
|
GCCP-2
|
sitakunda
|
|
0.19
|
|
|
6.70
|
M/S. Joynal & Brothers
|
11.46
|
|
15/11/2017
|
20/03/2018
|
100
|
|
|
|
|
556
|
GCHDP-WD-VZR-CHT-SITA-17/20.
|
Development of Polouan Para Rad By HBB at Ch. 00-350m.
|
GCCP-2
|
sitakunda
|
|
0.33
|
|
|
10.42
|
M/S. Three Star Enterprise
|
14.74
|
|
|
|
0
|
|
|
|
|
557
|
GCHDP-WD-VZR-CHT-SITA-17/13.
|
Development of South Sonaisory Road By HBB at Ch. 472-733m.
|
GCCP-2
|
sitakunda
|
|
0.35
|
|
|
13.40
|
|
0.00
|
|
|
|
0
|
|
|
|
|
558
|
GCP-3/ctg/WD-09
|
Pirkhain R&H-River Ghat via Haildhar UPC Rd.(Abdul Majid Chowdhury Rd).
|
GCRIDP-3
|
anwara
|
415043001
|
1.58
|
5.50
|
100
|
134.12
|
M/s SairedEntrrprise
|
127.42
|
14/06/2018
|
|
20/10/2019
|
100
|
123.32
|
100
|
03/01/2021
|
|
559
|
GCP-3/ctg/WD-43
|
Guzara-Tesury Rd
|
GCRIDP-3
|
anwara
|
415045017
|
1.22
|
6.00
|
0
|
109.94
|
M/s Jashim &Brothers
|
114.23
|
14/11/2018
|
|
30/04/2020
|
70
|
61.53
|
0
|
03/01/2021
|
|
560
|
GCP-3/ctg/WD-44
|
North Malghar Jame Mosque Road inc. link portion
|
GCRIDP-3
|
anwara
|
415045031
|
0.26
|
|
0
|
42.88
|
M/s Azad Entrrprise
|
40.74
|
07/11/2018
|
|
14/06/2019
|
100
|
39.89
|
0
|
03/01/2021
|
|
561
|
GCP-3/Ctg/WD-53
|
Improvement of Goni Shah Road
|
GCRIDP-3
|
anwara
|
415045031
|
0.79
|
1.50
|
100
|
61.79
|
M/S. Jashim & Brothers
|
64.08
|
13/01/2019
|
|
20/08/2019
|
100
|
63.48
|
100
|
03/01/2021
|
|
562
|
GCP-3/Ctg/WD-61
|
A) Improvement of Lal Mohammad (Lal Mohoti) Road
B) Improvement of Boirag-Guapanchak Road
|
GCRIDP-3
|
anwara
|
415044026,415044035
|
2.63
|
3.02
|
100
|
191.96
|
M/s Al kutub & Brothers
|
199.12
|
15/01/2019
|
|
25/01/2020
|
100
|
185.06
|
100
|
03/01/2021
|
|
563
|
GCP-3/ctg/WM-25
|
A) Maintenance of Barashat Gobadia Connecting Road by BC.
B) Maintenance of Anwara R&H-Barakhain UP Office Road via Badamtoli Bazar Road by BC .
C) Maintenance of Ayer Mongal R&H-Anner Ali Shikder Hat Road by BC
|
GCRIDP-3
|
anwara
|
415044037, 415043007, 415045001
|
3.55
|
3.00
|
|
101.03
|
M/S. Jashim & Brothers
|
95.98
|
28/05/2019
|
|
04/01/2020
|
65
|
62.98
|
|
03/01/2021
|
|
564
|
GCP-3/ctg/WM-27
|
Maintenance of Jiouria Fultoli R&H-Surut Bibe (Jan Ali Chowdhury Road) by BC
|
GCRIDP-3
|
anwara
|
415044012
|
2.50
|
|
100
|
59.99
|
M/S. Rima Construction
|
56.99
|
28/05/2019
|
|
04/01/2020
|
100
|
56.28
|
100
|
03/01/2021
|
|
565
|
GCP-3/Ctg/WD-96
|
Development of Anwara Joikali GC-Barakhain UP Office Road by BC
|
GCRIDP-3
|
anwara
|
415043012
|
0.96
|
5.75
|
|
100.89
|
M/S. Saired Enterprise
|
95.85
|
14/05/2019
|
|
21/03/2020
|
70
|
61.00
|
|
03/01/2021
|
|
566
|
GCP-3/ctg/WD-10
|
Development of Rustom hat Kanu Mazir Bazar-Burumchara UP Office via (Borumchara Hazari Road) Road by BC
|
GCRIDP-3
|
anwara
|
415043006
|
0.71
|
2.25
|
|
60.41
|
M/S. ALIM & BROTHERS
|
57.39
|
17/11/2019
|
|
23/06/2020
|
30
|
|
|
03/01/2021
|
|
567
|
GCP-3/ctg/WD-115
|
A) Development of Kunir Bill Road by BC.
B) Development of Heti Khayin-Borkal Ghat Road (Basiruzzaman Road) by BC
|
GCRIDP-3
|
anwara
|
415045016,415044015
|
1.80
|
9.50
|
|
170.55
|
M/S. AZAD ENTERPRISE
|
183.30
|
14/01/2020
|
|
21/01/2021
|
60
|
20.00
|
|
03/01/2021
|
|
568
|
GCP-3/ctg/WM-31
|
Maintenance of Pirkhain R&H-River Ghat via Haildhar UPC Road (Abdul Majid Chowdhury Road).
Maintenance of Anoara R&H Road-Khashama R&H Road.
|
GCRIDP-3
|
anwara
|
415043001, 415044054
|
1.97
|
|
|
63.65
|
M/S. RIDWANUL HOQUE & BROTHERS
|
60.47
|
01/03/2020
|
|
08/08/2020
|
5
|
|
|
03/01/2021
|
|
569
|
GCP-3/ctg/WD-159
|
Develoment of Shilaigora R&H-Sayed Kuchaiya Barkal PAB Road by BC
|
GCRIDP-3
|
anwara
|
415044009
|
0.92
|
1.00
|
|
85.04
|
M/S. ABDUS SABUR
|
80.79
|
27/02/2020
|
|
05/10/2020
|
10
|
|
|
03/01/2021
|
|
570
|
GCP-3/ctg/WD-155
|
Development of Moina Gazi Road by BC
|
GCRIDP-3
|
anwara
|
415044001
|
1.89
|
7.50
|
|
190.59
|
M/S. SHAH JABBARIA CONSTRUCTION & CO.
|
203.15
|
05/04/2020
|
|
12/11/2020
|
10
|
|
|
03/01/2021
|
|
571
|
GCP-3/ctg/WD-163
|
Develoment of Guzara Bazar-Haildhar UPC Road by BC
|
GCRIDP-3
|
anwara
|
415043014
|
0.67
|
3.00
|
|
75.67
|
M/S. RIDWANUL HOQUE & BROTHERS
|
71.89
|
27/04/2019
|
|
04/12/2020
|
65
|
32.00
|
|
03/01/2021
|
|
572
|
GCP-3/ctg/WDS-180
|
Development of West Raypor Government Primary School Connecting Road by HBB
|
GCRIDP-3
|
anwara
|
9941101801
|
1.00
|
|
|
61.20
|
M/S. ALFI ENTERPRISE
|
58.14
|
26/04/2020
|
|
03/11/2020
|
0
|
|
|
03/01/2021
|
|
573
|
GCP-3/ctg/WDS-181
|
Development of Cenamoti Government Primary School Connecting Road by HBB
|
GCRIDP-3
|
anwara
|
99411069001
|
0.93
|
1.00
|
|
55.83
|
M/S. DOT ENTERPRISE
|
53.04
|
01/06/2020
|
|
08/12/2020
|
30
|
|
|
03/01/2021
|
|
574
|
GCP-3/ctg/WD-162
|
Develoment of Anowara R&H-Barakhain UP office Road via Badamtoki Bazar Road by BC
|
GCRIDP-3
|
anwara
|
415043007
|
1.78
|
2.00
|
|
167.11
|
M/S A ALI CHOWDHURY
|
154.83
|
02/07/2020
|
|
09/03/2021
|
0
|
|
|
03/01/2021
|
|
575
|
GCP-3/ctg/WDS-189
|
Development of Banker Nurul Islam Chy Road (Ali Muddin Dovash GPS Connecting Road) by HBB
|
GCRIDP-3
|
anwara
|
99411011801
|
0.23
|
|
|
9.76
|
M/S. M A S K CONSTRUCTION
|
9.27
|
|
|
|
0
|
|
|
03/01/2021
|
|
576
|
GCP-3/ctg/WDS-190
|
Development of Poroikora Churushila GPS Connecting Road by HBB
|
GCRIDP-3
|
anwara
|
91411060912
|
0.14
|
|
|
12.32
|
M/S. H M FOUNDATION
|
11.71
|
09/07/2020
|
|
16/12/2020
|
0
|
|
|
03/01/2021
|
|
577
|
GCP-3/Ctg/WD-121
|
Development of Rustom hat Kanu Mazir Bazar-Burumchara UP Office via (Borumchara Hazari Road) Road by BC at. Ch: 5+220-5+930km.
|
GCRIDP-3
|
anwara
|
415043006
|
0.71
|
2.25
|
|
60.41
|
|
57.39
|
17/11/2019
|
|
24/01/2021
|
40
|
6.00
|
|
03/01/2021
|
|
578
|
GCP-3/Ctg/WD-195
|
Development of Shilalia Road (Barkal Bridge-Tisori Silalia Manurkhain Bazar Road) by BC at ch: 1000-1825m.
|
GCRIDP-3
|
anwara
|
415045048
|
0.83
|
3.00
|
|
81.47
|
|
77.40
|
01/09/2020
|
|
07/04/2021
|
0
|
|
|
03/01/2021
|
|
579
|
GCP-3/Ctg/WD-196
|
Development of Shilalia Jiori Fultoli R&H-Surat Bibi (Jan Ali Chowdhury Road) by BC at ch: 2500-2970m.
|
GCRIDP-3
|
anwara
|
415044012
|
0.47
|
2.00
|
|
44.51
|
|
42.29
|
31/08/2020
|
|
07/04/2021
|
0
|
|
|
03/01/2021
|
|
580
|
GCP-3/Ctg/WD-201
|
Construction of Bazar Sheed at Wahed Ali Bazar.
|
GCRIDP-3
|
anwara
|
|
|
|
|
39.71
|
|
37.73
|
01/09/2020
|
|
08/05/2021
|
0
|
|
|
03/01/2021
|
|
581
|
GCP-3/Ctg/WDS-197
|
Development of East Gohira Government Primary School Connecting Road by HBB at ch: 00-230m.
|
GCRIDP-3
|
anwara
|
99411011201
|
0.23
|
|
|
19.23
|
|
18.27
|
09/09/2020
|
|
16/02/2021
|
0
|
|
|
03/01/2021
|
|
582
|
GCP-3/Ctg/WDS-198
|
Development of Bairage Pilot Road (Mohadebpur Government Primary School Connecting Road) by HBB at ch: 00-665m.
|
GCRIDP-3
|
anwara
|
91411060108
|
0.67
|
1.00
|
|
39.10
|
|
37.15
|
30/09/2020
|
|
07/03/2021
|
0
|
|
|
03/01/2021
|
|
583
|
GCP-3/Ctg/WD-204
|
Development of Sarddar Para Road by BC at ch: 0+118-0+760km.
|
GCRIDP-3
|
anwara
|
415044033
|
|
|
|
87.80
|
|
83.41
|
15/10/2020
|
|
22/05/2021
|
0
|
|
|
03/01/2021
|
|
584
|
GCP-3/Ctg/WD-215
|
Improvement of keyagar-Chatary Road by BC at ch: 0+550-1+550km.
|
GCRIDP-3
|
anwara
|
415044027
|
1.00
|
2.25
|
|
92.51
|
|
87.88
|
19/11/2020
|
|
10/06/2021
|
0
|
|
|
03/01/2021
|
|
585
|
GCP-3/Ctg/WDS-210
|
Development of Saodagar Dighi Road (Noldia GPS School Connecting Road by HBB at ch: 00-570m.
|
GCRIDP-3
|
anwara
|
91411060504
|
0.57
|
3.10
|
|
42.94
|
|
40.79
|
|
|
|
0
|
|
|
03/01/2021
|
|
586
|
GCP-3/Ctg/WD-194
|
Development of Shouth Sholkata S.J Nijam High School Road by BC at ch: 00-655m.
|
GCRIDP-3
|
anwara
|
415044039
|
0.66
|
15.00
|
|
57.16
|
|
54.31
|
|
|
|
0
|
|
|
03/01/2021
|
|
587
|
GCP-3/Ctg/WM-07
|
A)Maintenance of Kalipur Emtazul Hoque Chy Road (Kamal Iskey Mostafa Road)
B)Maintenance of Banigram Union Land office to Shonkho River Road via Monayam Sha Bazar (Indra Narayon Road)
|
GCRIDP-3
|
banskhali
|
415085093 ,415084079
|
1.85
|
2.40
|
0
|
90.41
|
M/s. Salma Enterprise.
|
85.89
|
12/01/2019
|
|
09/05/2019
|
95
|
48.02
|
0
|
03/01/2021
|
|
588
|
GCP-3/ctg/WM-17
|
A) Maintenance of Boilgon Siraj Miah Road by BC.
B) Maintenance of Kotpara-Katharia-Bagmaara to Haliapara Road by BC
|
GCRIDP-3
|
banskhali
|
415085020, 415084097
|
1.64
|
|
100
|
44.72
|
M/S. H H Enterprise
|
42.48
|
13/03/2019
|
|
06/09/2019
|
100
|
42.16
|
100
|
03/01/2021
|
|
589
|
GCP-3/Ctg/WD-85
|
A)Development of Baharchara Foyz Ullah Master Road by HBB.
B)Development of Shadanpur P.U.H.S to Karim Bazar Road by HBB
|
GCRIDP-3
|
banskhali
|
415084039, 415084036
|
1.40
|
|
100
|
74.77
|
M/S. Romena Enterprise
|
71.03
|
02/04/2019
|
|
09/11/2019
|
100
|
70.91
|
100
|
03/01/2021
|
|
590
|
GCP-3/Ctg/WD-90
|
Development of kadam Rasul-Pramasia bazar Road (Baro Moulana Rd) by BC
|
GCRIDP-3
|
banskhali
|
415084090
|
1.88
|
1.80
|
|
90.24
|
M/S. B C H Internationa
|
85.73
|
15/05/2019
|
|
10/04/2020
|
100
|
64.00
|
|
03/01/2021
|
|
591
|
GCP-3/ctg/WD-129
|
Development of Shekerkhil Somadia Bahamoni Road by HBB
|
GCRIDP-3
|
banskhali
|
415084023
|
1.00
|
1.80
|
|
63.34
|
M/S. H M FOUNDATION
|
60.17
|
15/12/2019
|
|
22/07/2020
|
95
|
47.63
|
|
03/01/2021
|
|
592
|
GCP-3/ctg/WD-178
|
Development of katharia Raziullah Munshi Road from
|
GCRIDP-3
|
banskhali
|
415085125
|
0.98
|
4.00
|
|
129.26
|
M/S. ROBEL & BROTHERS
|
122.79
|
03/06/2020
|
|
30/12/2020
|
15
|
|
|
03/01/2021
|
|
593
|
GCP-3/ctg/WD-187
|
Development of Jaldi Mia hat-Napora Bazar via Chambol UP Office Road (Chambol Badshahee Road) by HBB
|
GCRIDP-3
|
banskhali
|
415083017
|
1.02
|
4.50
|
|
107.30
|
M/S. ROBEL & BROTHERS
|
101.94
|
16/06/2020
|
|
23/01/2021
|
10
|
|
|
03/01/2021
|
|
594
|
GCP-3/ctg/WD-28
|
Hamidia madrasha Road.
|
GCRIDP-3
|
boalkhali
|
415124005
|
1.00
|
1.50
|
100
|
89.64
|
M/s Abdul Salam
|
85.16
|
06/08/2018
|
|
13/06/2019
|
100
|
84.34
|
100
|
03/01/2021
|
|
595
|
GCP-3/ctg/WD-37
|
E.Gpomdandi UP - Hazir Hat (LM) Godown Road,(Janata Circular Road).
|
GCRIDP-3
|
boalkhali
|
415123010
|
1.57
|
3.00
|
100
|
147.48
|
M/s Azad Entrrprise
|
140.11
|
07/10/2018
|
|
27/02/2020
|
100
|
139.21
|
100
|
03/01/2021
|
|
596
|
GCP-3/Ctg/WD-84
|
Development of Shaheed Younus Road
|
GCRIDP-3
|
boalkhali
|
415124059
|
1.36
|
4.00
|
0
|
131.04
|
M/S. Forak Ahmed
|
124.48
|
23/04/2019
|
|
11/01/2020
|
70
|
80.00
|
0
|
03/01/2021
|
|
597
|
GCP-3/Ctg/WM-8
|
A) Maintenance of Kanungopara R&H Bura Mosque- Tajghar (Dhalghat D.C Road)
B)Maintenance of Ahalla Sadar para road
|
GCRIDP-3
|
boalkhali
|
415124001,415124078
|
2.23
|
3.50
|
100
|
84.58
|
M/s Sarkar Enterprise
|
80.35
|
07/02/2019
|
|
29/07/2019
|
100
|
78.02
|
100
|
03/01/2021
|
|
598
|
GCP-3/ctg/WD-42
|
Development of Sreepur Kharandwip UP-Kerani Hat(LM) Road (Okil Baidda Road ) by BC .
Development of Kharandwip Sufi Nurul Haq Jame Mosque Road by BC .
Development of Master Bazar Road by BC.
Development of Purba Dhorolla khali Bari Road by BC .
Development of Kaliar hat GC-Keranihat (LM) Road (Kalachad Thakur Road) by BC
|
GCRIDP-3
|
boalkhali
|
415123019,415124109,415124036,415124039,415123005
|
4.26
|
9.00
|
|
423.57
|
M/S A ALI CHOWDHURY
|
422.07
|
17/07/2019
|
|
24/07/2020
|
75
|
263.02
|
|
03/01/2021
|
|
599
|
GCP-3/ctg/WD-118
|
Development of Miapara-Nazir Dhighir Par Road (Fazal Fakir Road) by BC
|
GCRIDP-3
|
boalkhali
|
415124098
|
1.28
|
3.00
|
|
113.75
|
M/S. SOLAIMAN STORE
|
108.06
|
14/11/2019
|
|
21/07/2020
|
75
|
75.00
|
|
03/01/2021
|
|
600
|
GCP-3/ctg/WD-119
|
Development of Master Abul Kalam Azad Road by BC
|
GCRIDP-3
|
boalkhali
|
415124067
|
1.20
|
2.00
|
|
113.16
|
M/S. SOLAIMAN STORE
|
107.50
|
12/12/2019
|
|
18/08/2020
|
65
|
55.00
|
|
03/01/2021
|
|
601
|
GCP-3/ctg/WD-131
|
Development of Akubdandi Syed Abdur Nur Road by BC
|
GCRIDP-3
|
boalkhali
|
415124056
|
0.96
|
2.00
|
|
85.22
|
M/S. A S ENTERPRISE
|
80.96
|
15/12/2019
|
|
22/07/2020
|
65
|
49.00
|
|
03/01/2021
|
|
602
|
GCP-3/ctg/WD-94
|
Development of Ahamudur Rahman Road by BC
|
GCRIDP-3
|
boalkhali
|
415125113
|
1.40
|
3.50
|
|
142.31
|
TOWAKKUL ENTERPRISE -KGN ENTERPRISE (JV)
|
152.98
|
05/01/2020
|
|
12/09/2020
|
50
|
45.00
|
|
03/01/2021
|
|
603
|
GCP-3/ctg/WD-114
|
A) Development of Purba Gomdandi UP-Murad Munshir Hat GC Road (Ramesh Sil Road) by BC
B) Development of Amuchia UP-Golok Kanun Bazar (LM) Road (Kanongo Para Post office Road) by BC
|
GCRIDP-3
|
boalkhali
|
415123009,415123011
|
2.24
|
7.00
|
|
217.92
|
TOWAKKUL ENTERPRISE - FORAK AHMED & SONS(JV)
|
233.41
|
06/01/2020
|
|
13/01/2021
|
70
|
120.00
|
|
03/01/2021
|
|
604
|
GCP-3/ctg/WD-134
|
Development of Fakirhat Bazar
|
GCRIDP-3
|
boalkhali
|
|
|
|
|
58.05
|
M/S JEMU ENTERPRISE
|
55.15
|
14/01/2020
|
|
21/08/2020
|
20
|
|
|
03/01/2021
|
|
605
|
GCP-3/ctg/WD-136
|
Development of Munshi Bari Road by BC
|
GCRIDP-3
|
boalkhali
|
415124008
|
0.90
|
3.00
|
|
104.87
|
M/S. ABDUL SALAM
|
99.63
|
16/01/2020
|
|
23/08/2020
|
50
|
29.00
|
|
03/01/2021
|
|
606
|
GCP-3/ctg/WD-111
|
B) Development of Fultol-Kanungo Para (R&H) Road (Oli Bekari)-Lalarhat GC Road by BC
|
GCRIDP-3
|
boalkhali
|
415122007
|
2.26
|
3.00
|
|
307.69
|
M/S. YAKUB & BROTHERS
|
312.26
|
30/01/2020
|
|
07/02/2021
|
25
|
45.00
|
|
03/01/2021
|
|
607
|
GCP-3/ctg/WD-169
|
Develoment of Shakpura High School Road by BC
|
GCRIDP-3
|
boalkhali
|
415125046
|
0.86
|
3.00
|
|
94.82
|
M/S. ABRAR TRADING
|
90.08
|
08/06/2020
|
|
15/01/2021
|
15
|
|
|
03/01/2021
|
|
608
|
GCP-3/ctg/WDS-184
|
Development of Asadia Govt. Primary School Road by HBB (Allaha Asadia GPS School Connecting Road)
|
GCRIDP-3
|
boalkhali
|
415125161
|
1.00
|
2.00
|
|
65.76
|
M/S. DIPU KANTI PAUL
|
62.47
|
25/06/2020
|
|
02/12/2020
|
40
|
|
|
03/01/2021
|
|
609
|
GCP-3/Ctg/WD-89
|
Development of Munar Mar Mosjid Road by BC at ch0+000-0+635km.
|
GCRIDP-3
|
boalkhali
|
415125129
|
0.64
|
3.00
|
100
|
81.60
|
M/S. Didarul Alam
|
77.52
|
02/06/2019
|
|
20/01/2020
|
100
|
77.32
|
100
|
03/01/2021
|
|
610
|
GCP-3/Ctg/WD-130
|
Construction of 2-Vent 4.00m x 4.00m RCC Box Culvert at Shakpura Chawdhury R&H-Lalarhat GC Road at Ch: 165m.
|
GCRIDP-3
|
boalkhali
|
415122001
|
|
8.00
|
100
|
49.62
|
M/S. Abrar Trading
|
47.14
|
06/08/2020
|
|
03/11/2020
|
100
|
47.13
|
100
|
03/01/2021
|
|
611
|
GCP-3/Ctg/WDS-183
|
Development of Ahalla Dorbar Sharif (R&H-Santir hat Beyai Bazar (Champa Naryan Road) Road by BC (Allaha Utter vurshie School Connecting Road) at ch: 1+685-2+125km.
|
GCRIDP-3
|
boalkhali
|
415124018
|
0.44
|
1.00
|
|
48.36
|
|
45.95
|
27/09/2020
|
|
04/04/2021
|
30
|
|
|
03/01/2021
|
|
612
|
GCP-3/ctg/WD-32
|
Muradabad-Uttar Kanchan Nogor road.
|
GCRIDP-3
|
chandanish
|
415184037,415184040,415185030,
|
2.59
|
5.00
|
100
|
126.21
|
M/s AzadEntrrprise
|
119.90
|
14/10/2018
|
|
15/10/2019
|
100
|
119.04
|
100
|
03/01/2021
|
|
613
|
GCP-3/ctg/WD-54
|
Joara Kulalpara Road
|
GCRIDP-3
|
chandanish
|
415185076
|
1.13
|
2.00
|
|
96.26
|
M/s M JConstruction
|
96.27
|
22/11/2018
|
|
04/02/2021
|
60
|
55.00
|
|
03/01/2021
|
|
614
|
GCP-3/Ctg/WM-20
|
Maintenance of West Satbaria Natun Maszid Osman Fakir (RHD to RHD) Road
|
GCRIDP-3
|
chandanish
|
415185048
|
0.91
|
|
100
|
30.67
|
M/S. Islam & Sons
|
29.14
|
18/03/2019
|
|
14/08/2019
|
100
|
27.27
|
100
|
03/01/2021
|
|
615
|
GCP-3/ctg/WM-19
|
A) Maintenance of South-Purboo Hasimpur M.K high School-Shikderpara Road by BC.
B) Maintenance of Bolar Taluk (RHD) to South Gashbaria GPS (UZR) Road by BC
|
GCRIDP-3
|
chandanish
|
415184036, 415185051
|
1.31
|
|
100
|
28.60
|
M/S. Sarkar Enterprise
|
27.18
|
14/03/2019
|
|
11/08/2019
|
100
|
25.59
|
100
|
03/01/2021
|
|
616
|
GCP-3/ctg/WM-26
|
A) Maintenance of Dohajari G.C - Chagachar-Khagaria-Bhor Bazar G.C Road by BC
B) Maintenance of Hasimpur Jamirjuri Eidpukuria Road (Dohajari GC Connecting Road by BC
|
GCRIDP-3
|
chandanish
|
415182003, 415184001
|
3.76
|
|
|
91.01
|
M/S. Islam & Sons
|
86.45
|
26/05/2019
|
|
04/01/2020
|
60
|
50.60
|
|
03/01/2021
|
|
617
|
GCP-3/Ctg/WD-49
|
Improvement of Mohajan Gata to Barma Kalirhat (Al-Haz Ali Ahammed) Road by BC
|
GCRIDP-3
|
chandanish
|
415183009
|
1.45
|
6.00
|
100
|
141.17
|
M/S. A B & Sons
|
146.04
|
05/11/2018
|
|
29/12/2019
|
100
|
139.62
|
100
|
03/01/2021
|
|
618
|
GCP-3/Ctg/WD-56
|
Improvement of Boroma Collage Dhameerhat GC to Moulavi Bazar (RHD) Road by BC
Improvement of Fakir hat to Jamtal Bazar via Sha Alam Dohan Road (J.M Sen Road) by BC
Improvement of Badurpara (RHD) Munsif Bazar Chamudaria Bazar via Joara Bani GPS (RHD) Road Link by BC
|
GCRIDP-3
|
chandanish
|
415182008,415184003,415184013
|
3.27
|
8.00
|
|
386.53
|
M/S SHAH JABBARIA CONSTRUCTION-J S ENTERPRISE (JV)
|
42412.00
|
15/10/2019
|
|
22/10/2020
|
70
|
199.48
|
|
03/01/2021
|
|
619
|
GCP-3/Ctg/WD-55
|
Improvement of Chandanish Upazila H/Q (Nayahat) Bailtali-Kodarhat GC road by BC.
Improvement of Chandanish Upazila H/Q (Hospital) Churamoni (Al-Haj- Momtaz Oli) Sattarhat G.C Road by BC .
Improvement of Vogabanhat (RHD) to Koderhat GC via Ashraf Mohari Hat Bogerteg Road by BC
|
GCRIDP-3
|
chandanish
|
415182001,415182005,415182006
|
6.30
|
21.00
|
|
808.49
|
M/S. MOSTAFA & H E (JV)
|
864.78
|
26/01/2020
|
|
02/02/2021
|
45
|
200.00
|
|
03/01/2021
|
|
620
|
GCP-3/Ctg/WDS-139
|
Improvement of Sanowara Farm Govt. Primary School Connecting Road by HBB
|
GCRIDP-3
|
chandanish
|
99411109201
|
1.00
|
2.00
|
|
57.35
|
A.M.P. ENTERPRISE
|
54.48
|
27/02/2020
|
|
05/08/2020
|
0
|
|
|
03/01/2021
|
|
621
|
GCP-3/Ctg/WDS-140
|
A) Improvement of Paschim harala Schindraw Sikder Govt. Primary School Connecting Road by HBB .
) Improvement of Paschim harala Nabi Kulsum Govt. Primary School Connecting Road by HBB .
C) Improvement of Uttar Jamirjuri Govt. Primary School Connecting Road by HBB
|
GCRIDP-3
|
chandanish
|
99411031208,99411030401,99411030403
|
0.56
|
|
|
28.39
|
M/S. SALEH NUR CONSTRUCTION
|
26.97
|
27/02/2020
|
|
04/08/2020
|
55
|
14.00
|
|
03/01/2021
|
|
622
|
GCP-3/Ctg/WDS-141
|
A) Improvement of Mohammadpur (Ashab Sobhan) Govt. Primary School Connecting Road by HBB .
B) Improvement of Madhay Kanaimandary Govt. Primary School Connecting Road by HBB .
C) Improvement of Madhay Hasimpur Govt. Primary School Connecting Road by HBB .
D) Improvement of North Madhay Kanaimandary Govt. Primary School Connecting Road by HBB
|
GCRIDP-3
|
chandanish
|
91411100204,91411100501,91411100803,99411031402
|
1.01
|
|
100
|
21.67
|
M/S. KHUNDAKAR ENTERPRISE
|
20.58
|
27/02/2020
|
|
05/08/2020
|
100
|
20.49
|
100
|
03/01/2021
|
|
623
|
GCP-3/Ctg/WDS-142
|
A) Improvement of Diakul Govt. Primary School Connecting Road by HBB.
B) B) Improvement of Maddam Maradabad Govt. Primary School Connecting Road by HBB .
C) Improvement of East Jamirjuri Amitab Govt. Primary School Connecting Road by HBB .
D) Improvement of South Diakul K.M Govt. Primary School Connecting Road by HBB.
|
GCRIDP-3
|
chandanish
|
91411100401,99411030301,91411100406,99411020702
|
0.32
|
|
|
13.89
|
M/S. ISLAM TRADERS
|
13.19
|
18/02/2020
|
|
25/07/2020
|
100
|
|
|
03/01/2021
|
|
624
|
GCP-3/Ctg/WDS-143
|
A) Improvement of Samukchari Govt. Primary School Connecting Road by HBB .
B) Improvement of Paschim Dhopachari Govt. Primary School Connecting Road by HBB .
C) Improvement of Tapaaban Anath Asram Govt. Primary School Connecting Road by HBB .
|
GCRIDP-3
|
chandanish
|
99411109203,99411020201,99411031502
|
0.60
|
|
|
27.74
|
M/S. GARIN ENTERPRISE
|
27.29
|
19/02/2020
|
|
25/07/2020
|
100
|
20.00
|
|
03/01/2021
|
|
625
|
GCP-3/Ctg/WDS-144
|
A) Improvement of Haji Mohammad Khalil Badiuzzaman Govt. Primary School Connecting Road by HBB .
B) Improvement of Dhakkin Jafrabad Govt. Primary School Connecting Road by HBB.
C) Improvement of Basarat Nagor Govt. Primary School Connecting Road by HBB .
D) Improvement of Gachbaria Banikpara Govt. Primary School Connecting Road by HBB .
E) Improvement of Patandondy Uzir Ali Govt. Primary School Connecting Road by HBB .
F) Improvement of Hasandondy Govt. Primary School Connecting Road by HBB.
|
GCRIDP-3
|
chandanish
|
99411031301,9941100605,99411030601,91411100805,91411100508,91411100903
|
0.77
|
|
|
36.25
|
M/S. JANASHEBA ENTERPRISE
|
34.44
|
23/02/2020
|
|
30/07/2020
|
70
|
24.00
|
|
03/01/2021
|
|
626
|
GCP-3/Ctg/WM-33
|
Maintenance of Suchia GPS & Suchia Ram Krishna High School to Pathandandi Sree Sree Krishna via Mohajan Gate Road (Al- Haz Ali Ahmmed) Road by BC
|
GCRIDP-3
|
chandanish
|
415183009
|
0.78
|
|
|
18.95
|
M/S. ISLAM & SONS
|
18.00
|
24/03/2020
|
|
31/08/2020
|
95
|
15.00
|
|
03/01/2021
|
|
627
|
GCP-3/Ctg/WD-151
|
Construction of 22.00m Long RCC Girder Bridge on Boroma College Dhameerhat-GC to Moulavi Bazar (RHD) Road
|
GCRIDP-3
|
chandanish
|
415182008
|
|
22.00
|
|
260.96
|
M/S. ABSAR CONSTRION
|
249.57
|
18/05/2020
|
|
27/03/2021
|
30
|
50.00
|
|
03/01/2021
|
|
628
|
GCP-3/Ctg/WD-15
|
Development of Harualchari Lalarhat Road via Santirhat Road
|
GCRIDP-3
|
fatikchari
|
415333005
|
1.99
|
17.35
|
0
|
246.69
|
M/S. EB & MN (JV)
|
270.95
|
25/11/2019
|
|
02/10/2020
|
15
|
|
0
|
03/01/2021
|
|
629
|
GCP-3/ctg/WD-22
|
Paindong u.p H Q (Brindabonhat) to Kanchan Nagar U.p H .Q .Road via Kanchurhat
|
GCRIDP-3
|
fatikchari
|
415333006
|
2.06
|
5.00
|
|
171.21
|
M/s M A Construction
|
162.65
|
06/08/2018
|
|
31/01/2020
|
100
|
124.09
|
|
03/01/2021
|
|
630
|
GCP-3/ctg/WD-23
|
Dhurang Forest bit to Manikchari road Kanchannagar UP
|
GCRIDP-3
|
fatikchari
|
415335198
|
1.00
|
3.00
|
100
|
54.54
|
M/S S A Traders
|
51.81
|
30/07/2018
|
|
06/06/2019
|
100
|
51.75
|
100
|
03/01/2021
|
|
631
|
GCP-3/ctg/WD-26
|
Samitirhat Kulal Para Road
|
GCRIDP-3
|
fatikchari
|
415334062
|
1.00
|
2.75
|
100
|
85.97
|
M/s Masum Builders
|
88.55
|
30/09/2018
|
|
28/02/2020
|
100
|
85.89
|
100
|
03/01/2021
|
|
632
|
GCP-3/ctg/WD-47
|
Chowmuhani to Karnafuly Tea Estate road
|
GCRIDP-3
|
fatikchari
|
415334131
|
2.00
|
2.00
|
0
|
149.06
|
M/s M A Construction
|
141.61
|
14/11/2018
|
|
30/03/2020
|
100
|
133.00
|
0
|
03/01/2021
|
|
633
|
GCP-3/ctg/WM-03
|
A) Mohammed Tokirhat GC
B)Jonner Baper Masjeed Road
|
GCRIDP-3
|
fatikchari
|
415332013,415335082
|
2.29
|
5.00
|
100
|
76.51
|
M/S Nafi Traders
|
76.51
|
22/12/2018
|
|
05/08/2019
|
100
|
75.04
|
100
|
03/01/2021
|
|
634
|
GCP-3/Ctg/WD-72
|
Improvement of Barauthan UP-Jamtala Bazar Via PAB Road (Abdul Jalil Chowdary Road)
|
GCRIDP-3
|
fatikchari
|
415332012
|
1.86
|
5.20
|
0
|
224.33
|
M/s Sharnali Enterprise
|
213.12
|
23/01/2019
|
|
10/04/2020
|
100
|
107.00
|
0
|
03/01/2021
|
|
635
|
GCP-3/Ctg/WD-27
|
Improvement of Samitirhat Azam Bari Idris Road
|
GCRIDP-3
|
fatikchari
|
415334061
|
1.50
|
5.25
|
0
|
153.70
|
|
160.00
|
27/10/2020
|
|
03/09/2021
|
0
|
|
0
|
03/01/2021
|
|
636
|
GCP-3/Ctg/WD-51
|
Improvement of Kazirhat G.C to Lalar Hat (RHD) Road via Barobil Nayahat Road
|
GCRIDP-3
|
fatikchari
|
415332003
|
1.98
|
19.00
|
0
|
226.31
|
M/s Rfiqul Moula
|
214.99
|
22/07/2019
|
|
31/12/2020
|
30
|
35.39
|
0
|
03/01/2021
|
|
637
|
GCP-3/Ctg/WM-12
|
Maintenance of Fatikchari Upazila HQ to Lakshmichari Upazila HQ Road via kanchana Nagar Chamurhat Bazar
|
GCRIDP-3
|
fatikchari
|
415332011
|
4.04
|
20.00
|
0
|
379.04
|
M/S. Monir Ahmed
|
411.24
|
25/08/2019
|
|
30/06/2020
|
45
|
157.51
|
0
|
03/01/2021
|
|
638
|
GCP-3/Ctg/WM-14
|
Maintenance of Fatikchari Upazila HQ to Lakshmichari Upazila HQ Road via kanchana Nagar Chamurhat Bazar
|
GCRIDP-3
|
fatikchari
|
415332011
|
4.66
|
9.00
|
0
|
230.14
|
|
0.00
|
|
|
|
0
|
|
0
|
03/01/2021
|
|
639
|
GCP-3/Ctg/WM-04
|
A)Periodic Maintenance of Shantir hat Motor Road
B)Periodic Maintenance of Tofail Ahammed Road
|
GCRIDP-3
|
fatikchari
|
415334015,415334113
|
5.40
|
|
0
|
93.44
|
M/s. Mohsin & Brothers
|
88.77
|
10/01/2019
|
|
28/02/2020
|
100
|
80.00
|
0
|
03/01/2021
|
|
640
|
GCP-3/Ctg/WD-95
|
Development of Narayanhat UPC to Heako GC Road via Maazan, Hasnabad & Nischinta By BC.
|
GCRIDP-3
|
fatikchari
|
415333022
|
4.90
|
31.65
|
|
483.09
|
M/S. MONIR AHMED
|
521.74
|
02/09/2019
|
|
09/07/2020
|
25
|
72.00
|
|
03/01/2021
|
|
641
|
GCP-3/Ctg/WD-108
|
Development Sundarpur UPC to Azam Chowdhury Nayahat Bazar Road by BC
|
GCRIDP-3
|
fatikchari
|
415333021
|
1.00
|
3.35
|
|
97.19
|
M/S J S Traders
|
96.59
|
09/10/2019
|
|
12/10/2020
|
30
|
|
|
03/01/2021
|
|
642
|
GCP-3/Ctg/WD-65
|
A) Development of Kazirhat GC to Lalarhat Road via Barobil Noyahat by BC
B) Development of Haruaichari Latifa Bibi Road by HBB
|
GCRIDP-3
|
fatikchari
|
415332003,415335245
|
3.80
|
24.50
|
|
410.33
|
M/S ELIAS BROTHERS
|
443.95
|
14/01/2019
|
|
21/11/2020
|
50
|
106.27
|
|
03/01/2021
|
|
643
|
GCP-3/Ctg/WD-135
|
Development of Bagan Bazar UP-Natun Bazar Road by BC
|
GCRIDP-3
|
fatikchari
|
415333001
|
1.00
|
5.10
|
|
110.89
|
M/S SAIFUL & BROTHERS
|
105.35
|
16/01/2020
|
|
23/08/2020
|
0
|
|
|
03/01/2021
|
|
644
|
GCP-3/Ctg/WD-148
|
A) Development of adilpur GPS Connecting road by HBB.
B) Developmentof paschim bhuj pur gachuria GPS Connecting road.
|
GCRIDP-3
|
fatikchari
|
415335529,415335532
|
1.10
|
|
|
52.15
|
m/s s a minar & sons
|
49.54
|
24/02/2020
|
|
01/09/2020
|
100
|
|
|
03/01/2021
|
|
645
|
GCP-3/Ctg/WD-149
|
Development of bhuzpur amtoli gps connecting road by hbb
|
GCRIDP-3
|
fatikchari
|
415335523
|
1.60
|
|
|
78.52
|
m/s n a trading & co.
|
74.59
|
27/02/2020
|
|
05/09/2020
|
0
|
|
|
03/01/2021
|
|
646
|
GCP-3/Ctg/WDS-157
|
Improvement of Baromasia Talukder GPS Connecting Road by HBB
|
GCRIDP-3
|
fatikchari
|
99411080603
|
0.68
|
1.00
|
|
35.74
|
M/S KARIM ENTERPRISE
|
33.96
|
25/03/2020
|
|
01/10/2020
|
70
|
|
|
03/01/2021
|
|
647
|
GCP-3/Cox/WDS-168
|
Improvement of Baru Betua GPS (Barabetua-Sandip Para) Road by HBB
|
GCRIDP-3
|
fatikchari
|
415335279
|
1.33
|
|
|
62.14
|
M/S OMI & JARIN ENTERPRISE
|
59.03
|
21/04/2020
|
|
28/09/2020
|
55
|
|
|
03/01/2021
|
|
648
|
GCP-3/Cox/WDS-165
|
Improvement of Matin Nagar GPS (Chikonchara High School to Natun Bazar Road via Motion Nagar GPS) Road by HBB
|
GCRIDP-3
|
fatikchari
|
415335394
|
2.33
|
6.25
|
|
137.85
|
M/S. RAFIQ ENTERPRISE
|
130.95
|
19/05/2020
|
|
12/12/2020
|
0
|
|
|
03/01/2021
|
|
649
|
GCP-3/Cox/WDS-166
|
Improvement of Chela Uzan GPS (Dantmara-Natun Para) Road by HBB
|
GCRIDP-3
|
fatikchari
|
415335481
|
1.50
|
|
|
72.90
|
M/S. KAZI ENTERPRISE
|
69.25
|
19/05/2020
|
|
26/10/2020
|
10
|
|
|
03/01/2021
|
|
650
|
GCP-3/Cox/WDS-167
|
Improvement of Dulaichari GPS (Heako-Dholiachari) Road by HBB
|
GCRIDP-3
|
fatikchari
|
415334083
|
2.45
|
|
|
116.04
|
M/S. F R CONSTRUCTION
|
110.24
|
20/05/2020
|
|
12/12/2020
|
50
|
30.00
|
|
03/01/2021
|
|
651
|
GCP-3/Ctg/WM-37
|
Periodic Maintenance of Sundarpur Munshi Abdur Rashied Road by BC
|
GCRIDP-3
|
fatikchari
|
415334066
|
0.98
|
|
|
16.45
|
M/S. SUKANNYA ENTERPRISE
|
15.63
|
31/05/2020
|
|
07/11/2020
|
0
|
|
|
03/01/2021
|
|
652
|
GCP-3/Ctg/WD-188
|
Improvement of Chumur Hat Bazar at Kanchannager UP.
|
GCRIDP-3
|
fatikchari
|
|
|
|
|
47.48
|
M/S SARNALI ENTEPRISE
|
45.10
|
04/06/2020
|
|
11/01/2021
|
0
|
|
|
03/01/2021
|
|
653
|
GCP-3/Ctg/WD-185
|
Improvement of Kanchan Nagar Ajgar Bari to Ali Chowdhury Bari Road by BC
|
GCRIDP-3
|
fatikchari
|
415335461
|
1.00
|
6.00
|
|
97.39
|
M/S. SAMEER TRADERS
|
96.80
|
07/07/2020
|
|
14/01/2021
|
0
|
|
|
03/01/2021
|
|
654
|
GCP-3/Ctg/WD-200
|
Development of Lelang UPC-Kanchan Nagar UPC Road by BC at ch: 00-1862m.
|
GCRIDP-3
|
fatikchari
|
415334011
|
1.86
|
1.00
|
|
139.69
|
|
132.69
|
01/09/2020
|
|
|
0
|
|
|
03/01/2021
|
|
655
|
GCP-3/Ctg/WD-66
|
Improvement of South Nichintapur Road by BC at ch: 0+000-1+330 km.
|
GCRIDP-3
|
fatikchari
|
415334020
|
1.33
|
3.00
|
|
130.84
|
|
135.42
|
16/09/2020
|
|
26/04/2021
|
20
|
|
|
03/01/2021
|
|
656
|
GCP-3/Ctg/WD-100
|
Improvement of Lelang UPC to Charaliahat Bazar Road via Shainnashirhat & Lelang Neyhat (Gopal Gatta Road) by BC at ch: 1+900-5+100km.
|
GCRIDP-3
|
fatikchari
|
415333014
|
3.20
|
11.25
|
|
349.08
|
|
365.84
|
22/10/2020
|
|
29/08/2021
|
15
|
|
|
03/01/2021
|
|
657
|
GCP-3/Ctg/WD-202
|
Development of Sejuar Khan Road by BC at ch: 780-2190m.
|
GCRIDP-3
|
fatikchari
|
415334073
|
|
|
|
120.27
|
|
114.26
|
15/10/2020
|
|
22/06/2021
|
0
|
|
|
03/01/2021
|
|
658
|
GCP-3/Ctg/WM-13
|
Maintenance of Fatikchari Upazila HQ to Lakshmichari Upazila HQ Road via kanchana Nagar Chamurhat Bazar at ch: 0+000-4+760km.
|
GCRIDP-3
|
fatikchari
|
415332011
|
4.76
|
7.75
|
|
335.01
|
|
0.00
|
|
|
|
0
|
|
|
03/01/2021
|
|
659
|
GCP-3/Ctg/WD-158
|
Improvement of Narayanhat RHD to Garitaana Bazar Road by BC at ch: 1+000-3+050km.
|
GCRIDP-3
|
fatikchari
|
415332004
|
2.05
|
7.00
|
|
256.79
|
|
0.00
|
|
|
|
0
|
|
|
03/01/2021
|
|
660
|
GCP-3/Ctg/WD-186
|
Improvement of Nanupur UPC to Dowlat Munshir Hat Bazar Road (Nanupur-Khiram Road) Road by BC at ch: 6+262-8+262km.
|
GCRIDP-3
|
fatikchari
|
415333011
|
2.00
|
2.00
|
|
176.42
|
|
0.00
|
|
|
|
0
|
|
|
03/01/2021
|
|
661
|
GCP-3/Ctg/WD-34
|
Improvement of Siddiquia Road (Mekhol)
|
GCRIDP-3
|
hathazari
|
415374017
|
0.99
|
8.80
|
0
|
103.69
|
M/s Alam Abser & Co.
|
98.51
|
04/11/2018
|
|
28/02/2020
|
100
|
72.43
|
0
|
03/01/2021
|
|
662
|
GCP-3/Ctg/WD-76
|
Improvement of Aucha Mia Chowdhury Road (Buriri Char)
|
GCRIDP-3
|
hathazari
|
415375213
|
1.17
|
|
100
|
88.78
|
M/s Akil Enterprise
|
84.34
|
22/01/2019
|
|
31/01/2020
|
100
|
83.85
|
100
|
03/01/2021
|
|
663
|
GCP-3/Ctg/WD-78
|
Development of Kazi Khil Primary School Road (Chipatoli) road
|
GCRIDP-3
|
hathazari
|
415374077
|
0.71
|
1.80
|
0
|
57.49
|
M/s Renassance Enterprise
|
54.61
|
30/01/2019
|
|
15/08/2020
|
100
|
48.00
|
0
|
03/01/2021
|
|
664
|
GCP-3/Ctg/WD-57
|
Construction of 33.00m long PC Girder Bridge at ch. 00m over Dulakhali Khal on Dulakhali road
|
GCRIDP-3
|
hathazari
|
415375120
|
0.30
|
33.00
|
0
|
376.16
|
M/s. Chowdhury Enterprise and Consonance Engineering
|
376.17
|
30/01/2019
|
|
06/02/2020
|
90
|
240.09
|
0
|
03/01/2021
|
|
665
|
GCP-3/Ctg/WD-40
|
A) Development of Latif Para Road (Fatehpur)
B) Development of Dorduara Board School Road (Gorduara)
|
GCRIDP-3
|
hathazari
|
415375227,415375049
|
1.30
|
3.30
|
0
|
144.17
|
M/s Al kutub & Brothers
|
136.96
|
01/07/2019
|
|
30/06/2020
|
80
|
48.00
|
0
|
03/01/2021
|
|
666
|
GCP-3/Ctg/WD-67
|
A) Improvement of Basuadhala Road
B) Improvement of Faiz Ahmed (D.C Connecting ) Road (North Madrasha) Road
C) Improvement of Amin Mazi Road (Nangolmora)
|
GCRIDP-3
|
hathazari
|
415374084,415375164,415375040
|
2.77
|
4.20
|
0
|
263.01
|
M/s Akil Enterprise
|
249.86
|
22/01/2019
|
|
29/11/2019
|
85
|
150.32
|
0
|
03/01/2021
|
|
667
|
GCP-3/Ctg/WM-16
|
A) Maintenance of Faizur Rahman Road(Chikondondi)
B) Maintenance of Asad Ali Road (Sikerpur)
|
GCRIDP-3
|
hathazari
|
415374061,415374043
|
1.77
|
|
0
|
128.16
|
M/s. Hassan & Brothers
|
121.75
|
22/01/2019
|
|
31/01/2020
|
95
|
83.79
|
0
|
03/01/2021
|
|
668
|
GCP-3/ctg/WM-28
|
A) Maintenance of Hajee Safar Ali Road (Mirzapur) by BC
B) Maintenance of Atar Ali Road (Souty Madrasha Chikondondi) by BC
|
GCRIDP-3
|
hathazari
|
415374059, 415374030
|
1.90
|
|
|
43.33
|
M/S. Moriom Enterprise
|
41.16
|
12/06/2019
|
|
19/01/2020
|
80
|
8.00
|
|
03/01/2021
|
|
669
|
GCP-3/Ctg/WM-32
|
Maintenance of Abdul Aziz Road (Chipatoli) by BC
|
GCRIDP-3
|
hathazari
|
415375283
|
0.27
|
|
|
16.57
|
M/S ABSER & BROTHERS
|
16.57
|
27/02/2020
|
|
04/08/2020
|
0
|
|
|
03/01/2021
|
|
670
|
GCP-3/Ctg/WD-150
|
Development of Charia Noa Hat to Chipatali UP (Murad Road) (Mirzapur-Chipatoli) Road by BC
|
GCRIDP-3
|
hathazari
|
415373010
|
0.97
|
|
|
83.57
|
M/S. AFNAN ENTERPRISE
|
79.39
|
18/02/2020
|
|
24/08/2020
|
60
|
0.00
|
|
03/01/2021
|
|
671
|
GCP-3/Ctg/WD-147
|
Improvement of Chand Gazi (Forhadabad) Road by BC
|
GCRIDP-3
|
hathazari
|
415374033
|
0.91
|
0.60
|
|
74.57
|
M/S. B C H INTERNATIONAL
|
70.84
|
19/03/2020
|
|
26/09/2020
|
2
|
|
|
03/01/2021
|
|
672
|
GCP-3/Ctg/WM-30
|
A) Maintenance of Yousufia Road (Forhadabad) by BC
B) Maintenance of Chittagong Khagrachari Road to Brozrodam Road (Borzrodam Road) (Dhala) by BC
|
GCRIDP-3
|
hathazari
|
415374050, 415374112
|
1.36
|
1.25
|
|
34.45
|
M/S. GONI CONSTRUCTION
|
34.28
|
19/03/2020
|
|
26/08/2020
|
5
|
|
|
03/01/2021
|
|
673
|
GCP-3/Ctg/WD-174
|
Construction of 24.00m Long RCC Inverted Girder Bridge on Alawol Road
|
GCRIDP-3
|
hathazari
|
415374103
|
|
24.00
|
|
223.36
|
Mohammad younus & brothers
|
198.92
|
08/07/2020
|
|
15/05/2021
|
0
|
|
|
03/01/2021
|
|
674
|
GCP-3/Ctg/WD-176
|
Construction of 31.00m Long RCC Variable Girder Bridge on Kazir Khil AB Road (Chipatoli) at Ch. 780.00m.
|
GCRIDP-3
|
hathazari
|
415375041
|
|
31.00
|
|
289.47
|
|
275.46
|
10/08/2020
|
|
17/06/2021
|
10
|
|
|
03/01/2021
|
|
675
|
GCP-3/Ctg/WM-40
|
Maintenance of Dhalai Gumanmordon (Dhalai) Road by BC at Ch: 00-2000m.
|
GCRIDP-3
|
hathazari
|
415374107
|
2.00
|
|
|
52.80
|
|
51.16
|
14/10/2020
|
|
21/04/2021
|
0
|
|
|
03/01/2021
|
|
676
|
GCP-3/Ctg/WM-42
|
Maintenance of Azimpara (Hathazari) Road by BC at Ch: 00-800m.
|
GCRIDP-3
|
hathazari
|
415375007
|
0.80
|
|
|
19.72
|
|
18.74
|
13/10/2020
|
|
20/04/2021
|
0
|
|
|
03/01/2021
|
|
677
|
GCP-3/Ctg/WM-41
|
Maintenance of Dr.Sanaullah (S.Madarsha) Road by BC at Ch: 00-810m.
|
GCRIDP-3
|
hathazari
|
415374097
|
0.81
|
1.00
|
|
26.89
|
|
25.54
|
21/10/2020
|
|
28/04/2021
|
0
|
|
|
03/01/2021
|
|
678
|
GCP-3/Ctg/WD-74
|
Improvement of CTG Cox’s (RHD)- Karnafully River Road (College Bazar Road)
|
GCRIDP-3
|
Karnaphuli
|
415614032
|
1.00
|
1.50
|
0
|
161.43
|
M/s. S K Traders
|
153.35
|
12/02/2019
|
|
30/06/2020
|
85
|
47.66
|
0
|
03/01/2021
|
|
679
|
GCP-3/Ctg/WD-69
|
Improvement of PAB(RHD)-UZR Ukil Badrul Haque khan Road (Shadek Ali khan Road)
|
GCRIDP-3
|
Karnaphuli
|
415614030
|
1.95
|
6.50
|
0
|
313.03
|
M/S. A Ali Chowdhury
|
271.57
|
08/05/2019
|
|
15/03/2020
|
50
|
94.03
|
0
|
03/01/2021
|
|
680
|
GCP-3/Ctg/WD-70
|
Improvement of Shainertek (RHD) Khowaznagar Moulabir Dokan Road (Saifuzzaman Chowdary Javad) Road
|
GCRIDP-3
|
Karnaphuli
|
415614033
|
2.70
|
4.50
|
0
|
404.41
|
Delta Engineers & Construction
|
404.39
|
23/04/2019
|
|
28/02/2020
|
95
|
290.00
|
0
|
03/01/2021
|
|
681
|
GCP-3/Ctg/WD-120
|
Improvement of Middle Shikalbaha GPS-Kalarpool GPS Road (Wahidia Road) by RCC
|
GCRIDP-3
|
Karnaphuli
|
415614031
|
1.00
|
|
|
150.14
|
M/S. Nowrin and brothers
|
142.64
|
15/12/2019
|
|
22/07/2020
|
70
|
50.00
|
|
03/01/2021
|
|
682
|
GCP-3/Ctg/WD-71
|
A) Improvement of Miar Hat (RHD) –Deyang Hill Kaffco 6 no Pump Road from RHD#142 (Ukil Badrul Haque khan Road) by RCC
B) Improvement of Barauthan UP-Jamtala Bazar Via PAB Road (Abdul Jalil Chowdary Road) by RCC
|
GCRIDP-3
|
Karnaphuli
|
415612013, 415613014
|
1.22
|
|
|
466.14
|
M/S. Nipa Enterprise
|
452.15
|
07/03/2019
|
|
14/01/2020
|
70
|
177.00
|
|
03/01/2021
|
|
683
|
GCP-3/ctg/WD-24
|
Improvement of Tewari Hat GC to Chramba Up Via Andhar Manik Rd.
|
GCRIDP-3
|
lohagara
|
415473005
|
1.00
|
2.00
|
|
73.86
|
M/s Alam Entrrprise
|
70.18
|
06/08/2018
|
|
30/11/2019
|
100
|
30.03
|
|
03/01/2021
|
|
684
|
GCP-3/Ctg/WD-45
|
Improvement of Niazertek Tonkabati Forest Office via Kanuram Bazar Road (Kalauzan Feeder Road)
|
GCRIDP-3
|
lohagara
|
415472002
|
3.70
|
11.00
|
0
|
410.38
|
M/s Quashem Construction
|
433.99
|
05/02/2019
|
|
12/02/2020
|
100
|
399.78
|
0
|
03/01/2021
|
|
685
|
GCP-3/Ctg/WD-58
|
A) Construction of 54.00m long RCC Girder Bridge on Chunati Chandha Barua Para Forest Bit Road over Dulu khal
B) Construction of 30.00m long RCC Girder Bridge on Chunati Union-Chunati Kathalia Para-Hindu Para road Near Jetabon Buddha Bihar Over Hatiar Khal
|
GCRIDP-3
|
lohagara
|
415475087,415475048
|
|
84.00
|
0
|
606.59
|
M/S. Noor Syndicate- Shah Jabbaria (JV)
|
586.37
|
06/02/2019
|
|
13/02/2020
|
65
|
331.38
|
0
|
03/01/2021
|
|
686
|
GCP-3/ctg/WM-22
|
A) Maintenance of Adhunagar GC & RHD-Barahatia Tin Pather Matha Road by BC
B) Maintenance of Lohagara Roshiderpara Road by BC
|
GCRIDP-3
|
lohagara
|
415474038, 415474030
|
1.92
|
0.62
|
100
|
42.90
|
M/S. Dipu kanti paul
|
40.76
|
08/04/2019
|
|
02/10/2019
|
100
|
40.36
|
100
|
03/01/2021
|
|
687
|
GCP-3/ctg/WM-21
|
A) Maintenance of Amirabad UP-Kalauzan UP Road by BC.
B) Maintenance of Padua Hari Mondir Bara Para Road by BC
|
GCRIDP-3
|
lohagara
|
415473003, 415475079
|
2.05
|
2.22
|
100
|
40.84
|
M/S. Mahin Enterprise.
|
38.80
|
08/05/2019
|
|
15/10/2019
|
100
|
38.71
|
100
|
03/01/2021
|
|
688
|
GCP-3/Ctg/WD-29
|
A)Improvement of Barahatia Manu Fakir hat RHD-Naya hat RHD via Upazila H/Q Darbesh hat GC Charamba UP Road by BC
B) Improvement of Barahatia Manu Fakir hat RHD-Naya hat RHD via Upazila H/Q Darbesh hat GC Charamba UP Road by BC
C)Improvement of Dalu-Bridge-Fareengha Miar Bazar Road (Chunati-Fareengha Road) by BC.
D)Improvement of Adercher Rajghata-Tonnkaboty Road by HBB.
|
GCRIDP-3
|
lohagara
|
415472006,415472006,415474040,415475054
|
6.20
|
8.00
|
|
503.08
|
U T Mong- Shah Jabbaria (JV)
|
494.88
|
13/11/2018
|
|
30/05/2020
|
85
|
365.25
|
|
03/01/2021
|
|
689
|
GCP-3/Ctg/SWD-99
|
Development of Chunati Pantrisha Joynagar Narisha Road (Chambi Rabbar Dam Connecting Road) by HBB
|
GCRIDP-3
|
lohagara
|
415475086
|
1.30
|
11.22
|
100
|
93.77
|
M/S. Abdur Sabur
|
89.08
|
30/05/2019
|
|
06/01/2020
|
100
|
88.98
|
100
|
03/01/2021
|
|
690
|
GCP-3/Ctg/WD-92
|
A) Improvement of Charamba UP Office-Shapeer Road by HBB .
B) Improvement of Charamba Bayer Para School Conecting Road by HBB
|
GCRIDP-3
|
lohagara
|
415474048,415475047
|
2.91
|
16.60
|
|
216.58
|
M/S. UT MONG-SHAH JABBARIA (JV)
|
191.95
|
17/07/2019
|
|
30/11/2020
|
80
|
124.09
|
|
03/01/2021
|
|
691
|
GCP-3/Ctg/WD-137
|
Development of Amirabad UP to Kalauzan UP Road by BC.
|
GCRIDP-3
|
lohagara
|
415473003
|
1.00
|
1.00
|
|
94.66
|
M/S. RIDWANUL HOQUE & BROTHERS
|
89.93
|
16/01/2020
|
|
23/08/2020
|
30
|
|
|
03/01/2021
|
|
692
|
GCP-3/Ctg/WD-113
|
Construction of 69.00m Long RCC Girder Bridge on Putibila Sufi Fakir GPS to Saraiya Rambila Road
|
GCRIDP-3
|
lohagara
|
415473009
|
|
69.00
|
|
454.29
|
MR. UT MONG
|
436.04
|
30/01/2020
|
|
06/02/2021
|
45
|
159.36
|
|
03/01/2021
|
|
693
|
GCP-3/Ctg/WD-132
|
Construction of 81.00m Long PSC Gerder Bridge on Niazertek to Tonkabati Forest Office via Kanuram Bazar Road
|
GCRIDP-3
|
lohagara
|
415472002
|
|
81.00
|
|
560.59
|
M/S. NOOR SYNDICATE
|
545.06
|
18/03/2020
|
|
24/01/2021
|
25
|
|
|
03/01/2021
|
|
694
|
GCP-3/ctg/SWD-284
|
Improvement of Bangha Dokan Samsher Tila Road by BC at Ch: 00-1200m; Upazila: , District: Chattogram (ID No-415534252).
|
GCRIDP-3
|
mirsharai
|
415534252
|
1.20
|
2.25
|
100
|
109.73
|
Nabi Enterprise
|
104.24
|
27/03/2022
|
|
18/05/2023
|
100
|
104.10
|
100
|
30/04/2024
|
|
695
|
GCP-3/Ctg/WD-127
|
A) Development of Kamal teli Road (Border road to Khaia Ghona) Road by BC
B) Development of Mithanala UP to Bhorer Bazar Road (St. Panter Pokur) by BC
|
GCRIDP-3
|
mirsharai
|
415534169, 415533022
|
2.40
|
11.25
|
100
|
272.55
|
THE NEW TRADE
|
278.08
|
22/01/2020
|
|
05/12/2022
|
100
|
264.52
|
100
|
28/04/2024
|
|
696
|
GCP-3/ctg/WM-68
|
Periodic Maintenance of Dhum UP to Osmanpur UP Road via Moulovi Bazar (Bangla Bazar-Osmanpur Road) by BC at Ch: 00-1900m; Upazila: Miresarai, District: Chattogram (Salvage Materials Cost Tk. 204557.00) (ID No-415533007).
|
GCRIDP-3
|
mirsharai
|
415533007
|
1.90
|
|
100
|
8069131.00
|
Razia Enterprise
|
7665674.45
|
07/04/2022
|
|
15/09/2022
|
100
|
7649726.00
|
100
|
28/04/2024
|
|
697
|
GCP-3/ctg/WD-101
|
A) Development of Hamid Ullah Road by BC at Ch: 00-750m (ID No-415534024); Upazila: Mirsharai, District: Chattogram.
B) Development of Kali Bari Road (Old DT-Bishu Miah Via Kalibari) by BC at Ch: 00-975m (ID No-415535359); Upazila: Mirsharai, District: Chattogram.
C) Development of Uday Mahajan Road (Alinagar Border-Rezuudin Road) by BC at Ch: 00-650m (ID No-415534158); Upazila: Mirsharai, District: Chattogram.
|
GCRIDP-3
|
mirsharai
|
415534024, 415535359, 415534158
|
2.38
|
7.00
|
100
|
22490474.00
|
The New Trade Link
|
24063511.30
|
08/03/2021
|
|
28/08/2022
|
100
|
23592950.00
|
100
|
28/04/2024
|
|
698
|
GCP-3/ctg/SWD-256
|
Improvement of Sofia Road to Shidik Munshi Road by Uni-Block at Ch: 00-900m; Upazila: Miresarai, District: Chattogram (Salvage Materials Cost Tk. 179200.00) (ID No-415535081).
|
GCRIDP-3
|
mirsharai
|
415535081
|
0.90
|
2.00
|
100
|
11387358.00
|
M/S. Ishaque & Brothers
|
10817990.10
|
16/11/2021
|
|
25/10/2022
|
100
|
10791356.00
|
100
|
28/04/2024
|
|
699
|
GCP-3/ctg/SWD-248
|
Improvement of Abdul Wahab to Darogapara Mazar Road (UP-11) by Uni-Block at Ch: 2000-3200m; Upazila: Miresarai, District: Chattogram (ID No-415534108).
|
GCRIDP-3
|
mirsharai
|
415534108
|
1.20
|
3.45
|
100
|
14648041.00
|
M/S. Kashem Enterprise
|
15625318.00
|
03/10/2021
|
|
25/01/2023
|
100
|
147.95
|
100
|
28/04/2024
|
|
700
|
GCP-3/ctg/SWD-249
|
Improvement of Sufia Mithanala Road to Abdul Wahab Road by Uni-Block at Ch: 00-1300m; Upazila: Miresarai, District: Chattogram (ID No-415535106).
|
GCRIDP-3
|
mirsharai
|
415535106
|
1.30
|
3.00
|
100
|
14328908.00
|
M/S. F R Traders
|
152.97
|
21/09/2021
|
|
11/12/2022
|
100
|
152.92
|
100
|
28/04/2024
|
|
701
|
GCP-3/ctg/SWD-247
|
Improvement of Old Abutorab Darogar Hat Road by Uni-Block at Ch: 00-1300m; Upazila: Miresarai, District: Chattogram (ID No-415534391).
|
GCRIDP-3
|
mirsharai
|
415534391
|
1.30
|
5.50
|
100
|
154.44
|
M/S. Shajahan Construction
|
161.36
|
15/02/2022
|
|
12/01/2023
|
100
|
161.22
|
100
|
28/04/2024
|
|
702
|
GCP-3/ctg/WM-69
|
Periodic Maintenance of Bamonsundor Darogar Hat GC to Bari Bundth R & H Road via Luddakhali (Luddakhali-Shahazi Bazar-Bamonsundor Darogar Hat Road) by BC at Ch: 1100-2189m; Upazila: Miresarai, District: Chattogram (Salvage Materials Cost Tk. 111552.00) (ID No-415533015).
|
GCRIDP-3
|
mirsharai
|
415533015
|
1.09
|
|
100
|
56.46
|
Khan Construction
|
53.64
|
11/04/2022
|
|
20/11/2022
|
100
|
52.49
|
100
|
28/04/2024
|
|
703
|
GCP-3/ctg/SWD-257
|
Improvement of Mia Bari Road (Takia Rd-Mithnala High School) by Uni-Block at Ch: 00-1000m; Upazila: Miresarai, District: Chattogram (ID No-415534264).
|
GCRIDP-3
|
mirsharai
|
415534264
|
1.00
|
2.00
|
100
|
118.07
|
M/S. Jahan Steel
|
112.17
|
18/11/2021
|
|
25/01/2023
|
100
|
112.09
|
100
|
28/04/2024
|
|
704
|
GCP-3/ctg/WD-02
|
Gozaria Bazar to samitire Hat Bazar (Shaheed Nashir Uddin Road) By BC.
|
GCRIDP-3
|
mirsharai
|
415533010
|
1.55
|
3.00
|
100
|
132.35
|
M/S Junayet Enterprise
|
132.36
|
22/05/2018
|
|
29/05/2019
|
100
|
132.33
|
100
|
03/01/2021
|
|
705
|
GCP-3/ctg/WD-03
|
Tarakatia Road
|
GCRIDP-3
|
mirsharai
|
415534140
|
1.70
|
4.00
|
100
|
156.59
|
M/S Junayet Enterprise
|
164.42
|
22/05/2018
|
|
29/05/2019
|
100
|
164.20
|
100
|
03/01/2021
|
|
706
|
GCP-3/ctg/WD-04
|
Zorargong Bazar R&H to Rail line road (Fakir Astana road)
|
GCRIDP-3
|
mirsharai
|
415534075
|
1.07
|
3.00
|
100
|
79.50
|
M/S Mahin Associates
|
75.52
|
15/05/2018
|
|
23/06/2019
|
100
|
75.50
|
100
|
03/01/2021
|
|
707
|
GCP-3/ctg/WD-01
|
Nizampur R&H to Shaherkhali R&H via Damdama Bazar and Bhorerhat GC (Oli Ahmed Abdur Rahman Road)
|
GCRIDP-3
|
mirsharai
|
415532004
|
2.10
|
5.00
|
100
|
281.41
|
The New Trade Link
|
279.55
|
31/05/2018
|
|
07/04/2019
|
100
|
274.66
|
100
|
03/01/2021
|
|
708
|
GCP-3/ctg/WD-05
|
Sonapahar R&H to Zorargong Takar Hat R&H road (Jarif Mahammad Rd).
|
GCRIDP-3
|
mirsharai
|
415534021
|
1.00
|
7.00
|
100
|
126.18
|
M/S Nazim Traders
|
119.87
|
30/05/2018
|
|
06/04/2019
|
100
|
106.30
|
100
|
03/01/2021
|
|
709
|
GCP-3/ctg/WD-06
|
Nazar Ali Bhuyan Road
|
GCRIDP-3
|
mirsharai
|
415534125
|
1.50
|
8.50
|
|
164.77
|
M/S Sayeman Enterprise
|
156.53
|
30/05/2018
|
|
06/03/2020
|
95
|
132.86
|
|
03/01/2021
|
|
710
|
GCP-3/ctg/WD-07
|
West Bariakhali-Cyclone Shelter Road (Eashak Driver Hat-Cyclone Shelter Road)
|
GCRIDP-3
|
mirsharai
|
415534385
|
0.96
|
1.00
|
100
|
84.62
|
M/S Onik Traders
|
84.20
|
11/06/2018
|
|
18/04/2019
|
100
|
77.97
|
100
|
03/01/2021
|
|
711
|
GCP-3/ctg/WD-12
|
Mayani UP to Annerderhat bazar Road via Maddam Mayani ( Abutorab- Annerderhat)
|
GCRIDP-3
|
mirsharai
|
415533005
|
0.70
|
|
0
|
63.08
|
M/S R.A Enterprise
|
62.83
|
21/06/2018
|
|
10/02/2020
|
100
|
58.70
|
0
|
03/01/2021
|
|
712
|
GCP-3/ctg/WD-13
|
Moghadia UP to Bari Bundth R&H via Thakur hat, Mozumdarhat & Banglabazar(Abutorab-Hashem Nagar-Char sarat road)
|
GCRIDP-3
|
mirsharai
|
415533010
|
0.45
|
0.75
|
100
|
37.19
|
M/S Miressari Enterprise
|
38.87
|
02/07/2018
|
|
29/05/2019
|
100
|
38.84
|
100
|
03/01/2021
|
|
713
|
GCP-3/ctg/WD-14
|
Kalu kazi Mollah Rd.
|
GCRIDP-3
|
mirsharai
|
415534015
|
1.20
|
0.75
|
100
|
95.44
|
M/S Sayeman Enterprise
|
100.21
|
05/07/2018
|
|
12/05/2019
|
100
|
100.08
|
100
|
03/01/2021
|
|
714
|
GCP-3/ctg/WD-25
|
Hadi Fakirhat GC R&H to Shaher khali UP road via Bhuiyar Hat
|
GCRIDP-3
|
mirsharai
|
415533006
|
1.92
|
6.00
|
0
|
167.88
|
M/S Sayeman Enterprise
|
175.94
|
06/08/2018
|
|
13/06/2019
|
75
|
114.08
|
0
|
03/01/2021
|
|
715
|
GCP-3/ctg/WD-08
|
Mithanala UP - Esak Driver Hat road via Rahmatabad (Mithanala -Rahmatabad Central Road)
|
GCRIDP-3
|
mirsharai
|
415533024
|
3.90
|
10.00
|
0
|
319.90
|
The New Trade Link
|
318.87
|
25/09/2018
|
|
30/05/2020
|
100
|
262.16
|
0
|
03/01/2021
|
|
716
|
GCP-3/ctg/WD-46
|
Yousuf Ali Road
|
GCRIDP-3
|
mirsharai
|
415534215
|
0.42
|
1.00
|
0
|
46.96
|
M/S. A B Enterprise
|
44.61
|
26/04/2020
|
|
29/11/2020
|
0
|
|
0
|
03/01/2021
|
|
717
|
GCP-3/ctg/WD-50
|
Takia Road up to khal by bc.
|
GCRIDP-3
|
mirsharai
|
415534127
|
1.41
|
3.00
|
100
|
150.65
|
M/s. Dulal & sons
|
143.11
|
28/02/2019
|
|
19/04/2020
|
100
|
139.15
|
100
|
03/01/2021
|
|
718
|
Gcp-3/ctg/WM-18
|
Maintenance of Abdul Gafur-Golam Rahman Munshi Road
|
GCRIDP-3
|
mirsharai
|
415534348
|
0.75
|
1.50
|
100
|
28.98
|
M/S. Miressarai Enterprise
|
27.53
|
14/03/2019
|
|
10/08/2019
|
100
|
27.53
|
100
|
03/01/2021
|
|
719
|
GCP-3/Ctg/WD -83
|
Construction of 2vx4.00mx4.00m RCC Box culvert on Barayer Hat R&H to Aburhat GC via Santirhat GC (Santirhat-Abur Hat G.C Road) at ch:10+030km
|
GCRIDP-3
|
mirsharai
|
415532006
|
|
8.00
|
|
48.15
|
M/S. Nafi Traders
|
45.75
|
09/04/2019
|
|
16/01/2020
|
0
|
|
|
03/01/2021
|
|
720
|
GCP-3/Ctg/WD-60
|
Development of Hazi Abdul Haque Road
|
GCRIDP-3
|
mirsharai
|
415535127
|
1.16
|
3.00
|
0
|
102.40
|
M/s Junayet Enterprise
|
101.89
|
03/01/2019
|
|
10/01/2020
|
100
|
94.43
|
0
|
03/01/2021
|
|
721
|
GCP-3/Ctg/WM-11
|
Maintenance of Shaheed Shanto Road
|
GCRIDP-3
|
mirsharai
|
415534086
|
0.47
|
0.75
|
100
|
25.68
|
M/s. Haque Traders
|
24.39
|
17/01/2019
|
|
24/05/2019
|
100
|
24.39
|
100
|
03/01/2021
|
|
722
|
GCP-3/Ctg/WD-59
|
A) Development of Seru Member Road.
B) Development of Mowlana Nazir Ahmed Road (Sattar Bhuiyan Bazar- Habibullah Road)
|
GCRIDP-3
|
mirsharai
|
415535304, 415534228
|
1.83
|
4.00
|
0
|
201.27
|
M/s Junayet Enterprise
|
200.27
|
03/01/2019
|
|
30/12/2020
|
100
|
149.47
|
0
|
03/01/2021
|
|
723
|
GCP-3/Ctg/WD-75
|
A)Improvement of Saheed Zakir Hossain Road to Gul Chori Rahamatpur Road
B)Improvement of Ram Mainik Kar Road (Sarker Taluk Road)
|
GCRIDP-3
|
mirsharai
|
415535071, 415534166
|
2.05
|
5.00
|
0
|
182.16
|
M/s. A S Chowdhury
|
173.05
|
22/01/2019
|
|
29/01/2020
|
90
|
141.98
|
0
|
03/01/2021
|
|
724
|
GCP-3/ctg/WM-29
|
A) Maintenance of DT Road-D.C Obaidullah Road (Sayed Ali/Arab ali Mistry Road) by BC.
B) Maintenance of Sayedpur Bundh Road (Sufia Road-Chandpur Road) by BC.
C) Maintenance of Rezauddin of Muhuri Road by BC.
|
GCRIDP-3
|
mirsharai
|
415534293, 415534258, 415535018
|
2.40
|
|
100
|
107.35
|
M/S. Shahjahan Construction
|
101.98
|
13/06/2019
|
|
20/01/2020
|
100
|
101.89
|
100
|
03/01/2021
|
|
725
|
GCP-3/Ctg/WD-104
|
Development of Jamal Dhakan R&H to Rail Line Road (Shah Sundar Mia road) by BC
|
GCRIDP-3
|
mirsharai
|
415534017
|
1.18
|
4.50
|
|
131.98
|
M/S. AKIF ENTERPRISE
|
125.38
|
15/09/2019
|
|
22/09/2020
|
80
|
95.39
|
|
03/01/2021
|
|
726
|
GCP-3/Ctg/WD-107
|
Development of R&H Road to Kararhat Forest Road by HBB
|
GCRIDP-3
|
mirsharai
|
415535126
|
1.00
|
1.00
|
|
60.19
|
M/S K I BUILDERS
|
57.18
|
17/09/2019
|
|
24/05/2020
|
100
|
50.00
|
|
03/01/2021
|
|
727
|
GCP-3/Ctg/WD-126
|
Development of Nazir Ahmed Road by BC
|
GCRIDP-3
|
mirsharai
|
415535048
|
1.45
|
3.00
|
|
126.23
|
M/S SHOHAG ENTEPRISE
|
132.41
|
14/01/2020
|
|
15/12/2020
|
80
|
94.00
|
|
03/01/2021
|
|
728
|
GCP-3/Ctg/WD-133
|
Development of Zorargong Rural Market.
|
GCRIDP-3
|
mirsharai
|
373610
|
|
|
100
|
52.61
|
MS/ MIRSARAI ENTERPRISE
|
49.98
|
28/01/2020
|
|
03/09/2020
|
100
|
48.82
|
100
|
03/01/2021
|
|
729
|
GCP-3/Ctg/WD-153
|
Development of Habildar Basa R&H to Amulia Ghat Bazar via Olinagar High School (Oli nagar Border Road) by BC
|
GCRIDP-3
|
mirsharai
|
415532014
|
1.32
|
1.00
|
|
149.18
|
M/S BITHI BUILDCOM
|
141.72
|
24/02/2020
|
|
01/10/2020
|
30
|
|
|
03/01/2021
|
|
730
|
GCP-3/Ctg/WD-154
|
Development of Murarypur R&H to Janardanpur High School Road (Muraypur-janardanpur High School Road) by BC
|
GCRIDP-3
|
mirsharai
|
415534019
|
1.00
|
2.25
|
|
101.34
|
M/S. ADIAN ENTERPRISE
|
96.27
|
27/02/2020
|
|
05/10/2020
|
20
|
|
|
03/01/2021
|
|
731
|
GCP-3/Ctg/WD-171
|
Rehabilitation of Single Vent 5.00m x 5.00m RCC Box Culvert on Mogadia UP to Thakurhat Bazar road (Wasem Chowdhury Road)
|
GCRIDP-3
|
mirsharai
|
415534009
|
|
5.00
|
|
53.37
|
M/S MAHABUB & CO.
|
50.69
|
26/04/2020
|
|
03/12/2020
|
0
|
|
|
03/01/2021
|
|
732
|
GCP-3/Ctg/WD-175
|
Development of Khurmawala Road (Ram Mondol-Bhuyan Taluk Rd) by BC
|
GCRIDP-3
|
mirsharai
|
415534275
|
0.47
|
1.00
|
|
63.91
|
M/S TASPIYA ENTERPRISE
|
60.72
|
03/05/2020
|
|
10/12/2020
|
30
|
12.00
|
|
03/01/2021
|
|
733
|
GCP-3/Ctg/WD-110
|
Development of Mogadia UP to Shadurhat Bazar Road via Dorgapara Abutorab-Shadurhat Road) by BC
|
GCRIDP-3
|
mirsharai
|
415533012
|
2.85
|
4.00
|
|
296.37
|
THE NEW TRADE LINK
|
326.09
|
18/05/2020
|
|
25/05/2021
|
50
|
150.37
|
|
03/01/2021
|
|
734
|
GCP-3/Ctg/WD-152
|
Construction of 20.00m Long RCC Girder Bridge on Kamaldaha-Dhamdama-Abutorab Bazar Road Wahedpur RHD to Moghadia UP Dhamdama Bazar
|
GCRIDP-3
|
mirsharai
|
|
|
20.00
|
|
170.09
|
M/S SHAHJAHAN TRADE LINK (JV)
|
156.49
|
08/07/2020
|
|
15/05/2021
|
60
|
57.68
|
|
03/01/2021
|
|
735
|
GCP-3/Ctg/WD-177
|
Construction of 18.00m Long RCC Girder Bridge on Habildar Basa R&H to Amulia Ghat Bazar via Olinagar High School (Oli nagar Border Road) by BC
|
GCRIDP-3
|
mirsharai
|
415532014
|
|
18.00
|
|
190.08
|
THE NEW TRADE LINK
|
172.02
|
29/06/2020
|
|
06/05/2021
|
60
|
64.47
|
|
03/01/2021
|
|
736
|
GCP-3/Ctg/WD-105
|
Construction of 24.00m long RCC Girder Bridge on shaheed zakir hossain road (koila) at ch:2650m.
|
GCRIDP-3
|
mirsharai
|
415534117
|
|
24.00
|
100
|
147.29
|
Kashem Traders & Tulitushi Enterprise JV
|
142.65
|
29/10/2019
|
|
05/11/2020
|
100
|
142.47
|
100
|
03/01/2021
|
|
737
|
GCP-3/Ctg/WD-214
|
Development of Mogadia UP to Shadurhat Bazar Road via Dorgapara (Abutorab-Shadur Hat Road) by BC at ch: 2+850-3+625km.
|
GCRIDP-3
|
mirsharai
|
415533012
|
0.78
|
4.00
|
|
113.85
|
|
108.16
|
07/10/2020
|
|
04/05/2021
|
30
|
15.00
|
|
03/01/2021
|
|
738
|
GCP-3/Ctg/WD-209
|
Development of Katachara UP to Taytoia Bazar Road by BC at ch: 0+000-2+105m.
|
GCRIDP-3
|
mirsharai
|
415533019
|
2.11
|
9.00
|
|
306.95
|
|
0.00
|
|
|
|
0
|
|
|
03/01/2021
|
|
739
|
GCP-3/Ctg/WD-173
|
Development of Bamonsundar-daroger Hat GC to Abur Hat GC Road via Joulanpool Bazar (Bamonsundar-Bariakhali-Joulanpool Road & Joulanpol-Abu Hat Road) by BC at ch: 2+480-4+480km.
|
GCRIDP-3
|
mirsharai
|
415532016
|
2.00
|
9.00
|
|
269.92
|
|
269.91
|
02/11/2020
|
|
09/09/2021
|
0
|
|
|
03/01/2021
|
|
740
|
GCP-3/Ctg/WD-222
|
Development of Khayachara UP R&H to Duaru Bridge Road (Duaru Road) by BC at ch: 0+000-0+382km
|
GCRIDP-3
|
mirsharai
|
415534026
|
0.38
|
1.50
|
|
59.13
|
|
0.00
|
|
|
|
0
|
|
|
03/01/2021
|
|
741
|
GCP-3/Ctg/WD-87
|
Improvement of Kanchanabad UP (Chandanaish Upazila)-Shovandandi UP-Muralihat Road (Patiya Part)
|
GCRIDP-3
|
patiya
|
415613003
|
1.00
|
2.50
|
0
|
104.13
|
The Paramount International
|
98.93
|
04/04/2019
|
|
25/06/2020
|
20
|
|
0
|
03/01/2021
|
|
742
|
GCP-3/Ctg/WDS-62
|
A) Improvement of Kartala (RHD)-Belkhain GPS via Acharjee Para Road (Kartala Balkhain Road)
B) Improvement of Kharana UP-Haidgaon Annanda Datta (RHD) Road (Rajghata Road)
C) Improvement of Karankhain Village Road
D)Improvement of Dhawardenga Kaliaish (Banga Mazi Road)
|
GCRIDP-3
|
patiya
|
415614018,415614065,415615022,415615071
|
3.10
|
9.00
|
100
|
181.92
|
M/s. Tahera Enterprise
|
172.82
|
14/01/2019
|
|
21/01/2020
|
100
|
167.80
|
100
|
03/01/2021
|
|
743
|
GCP-3/Ctg/WDS-63
|
A) Development of Sargiya Prof. Pulin Dey Road
B) Development of kolagaon UP (RHD)-Sikalbhaha Ghat Road (Dwip Kalar Moral Lakhera Baruapara)
|
GCRIDP-3
|
patiya
|
415615247,415613016
|
1.79
|
5.00
|
0
|
103.31
|
M/s. Jabbaria Construction & Co.
|
98.14
|
16/01/2019
|
|
23/01/2020
|
100
|
76.19
|
0
|
03/01/2021
|
|
744
|
GCP-3/Ctg/WDS-64
|
A) Improvement of Asia Bathua Village Road
B) Improvement of Paschim Azimpur Bogun Para Road
C) Improvement of Kalishahar Moitala Uttar Burishi Road
|
GCRIDP-3
|
patiya
|
415615040,415615378,415615051
|
2.25
|
3.00
|
100
|
117.77
|
M/s. J K Enterprise
|
111.88
|
03/01/2019
|
|
14/08/2019
|
100
|
110.82
|
100
|
03/01/2021
|
|
745
|
GCP-3/ctg/WD-11
|
Dovashi Bazar GC - Nischintapur - RHD Mogalerhat (From RHD #103)
|
GCRIDP-3
|
rangunia
|
415702009
|
2.30
|
7.75
|
0
|
291.38
|
Dolly Construction
|
307.80
|
08/10/2018
|
|
31/05/2020
|
55
|
140.00
|
0
|
03/01/2021
|
|
746
|
GCP-3/Ctg/WD-41
|
Development of Parua UP Office -Sonai chori Bazar (Rangunia Part)
|
GCRIDP-3
|
rangunia
|
415703010
|
1.64
|
|
0
|
155.03
|
|
0.00
|
|
|
|
0
|
|
0
|
03/01/2021
|
|
747
|
GCP-3/Ctg/WM-15
|
Maintenance of RHD Shishutal-Ranirhat GC Road
|
GCRIDP-3
|
rangunia
|
415702006
|
3.20
|
2.25
|
0
|
97.16
|
M/S. Creation Construction
|
92.30
|
16/09/2019
|
|
05/03/2020
|
50
|
25.00
|
0
|
03/01/2021
|
|
748
|
GCP-3/Ctg/WD-86
|
Improvement of Azimpir Road (Khurushia Darikope Road-Semipara)
|
GCRIDP-3
|
rangunia
|
415705231
|
1.20
|
5.25
|
100
|
91.72
|
M/S. Afsana Enterprise
|
87.13
|
04/04/2019
|
|
20/12/2019
|
100
|
86.03
|
100
|
03/01/2021
|
|
749
|
GCP-3/Ctg/WM-24
|
Maintenance of Padua Razar Hat-Horihor GPS-RHD Narissa Bottal (SDO Road) Road
|
GCRIDP-3
|
rangunia
|
415704003
|
2.66
|
1.00
|
0
|
127.83
|
|
0.00
|
|
|
|
0
|
|
0
|
03/01/2021
|
|
750
|
GCP-3/Ctg/WM-01
|
A)Periodic Maintenance of RHD Brammon Ghat- Darikope High School-Chipchari Pekua Fruits Fram (Darikope Road)
B) Rehabilitation Dovashi Bazar GC-kodala UP-Shilok Up-Sarafvata Up- RHD Godown (Hazee Sayed Ali Road)
|
GCRIDP-3
|
rangunia
|
415704002 ,415702004
|
3.87
|
5.00
|
0
|
99.27
|
M/s. Al-Amin
|
94.30
|
30/01/2019
|
|
18/07/2019
|
50
|
60.71
|
0
|
03/01/2021
|
|
751
|
Gcp-3/ctg/WM-02
|
Periodic maintenance of RHD Rampgotirhat karnafully River Ghta.
|
GCRIDP-3
|
rangunia
|
415705129
|
0.73
|
2.62
|
100
|
36.20
|
M/s Jahanara & sons
|
34.39
|
10/01/2019
|
|
18/06/2019
|
100
|
33.96
|
100
|
03/01/2021
|
|
752
|
GCP-3/Ctg/WD-88
|
Construction of 20m Long RCC Girder Bridge (Clear Traffic Width 5.50m) over Gochara Katakhali Khal on Pomra GPS-Kaidiazam Market (Bacha Shah Road)
|
GCRIDP-3
|
rangunia
|
415704032
|
|
20.00
|
|
175.46
|
M/S. SALEHA CONSRUCTION
|
163.98
|
17/09/2019
|
|
24/07/2020
|
85
|
103.74
|
|
03/01/2021
|
|
753
|
GCP-3/Ctg/WD-109
|
Development of Pomra GPS-Kaidazam Market (Bachsah Road) by BC.
Development of Moriom Nagar RHD-Jaladas Para (Moriom Nagar Jaladas Para) Road by HBB
|
GCRIDP-3
|
rangunia
|
415704032,415705422
|
1.18
|
4.00
|
|
125.63
|
M/S. SALEHA CONSRUCTION
|
137.42
|
24/10/2019
|
|
07/11/2020
|
80
|
49.61
|
|
03/01/2021
|
|
754
|
GCP-3/Ctg/WD-117
|
Development of Parastani Bile Road (Shilak Nazir Ahammed Road-Goas Tali Para) by HBB
|
GCRIDP-3
|
rangunia
|
415705559
|
1.00
|
6.75
|
|
71.23
|
M/S. A S CHOWDHURY
|
67.67
|
16/01/2020
|
|
24/07/2020
|
45
|
22.21
|
|
03/01/2021
|
|
755
|
GCP-3/Ctg/WD-31
|
Improvement of Sarafvata UP-Mirrerkhill Bazar (Hazee Asraf Ali Road) by BC
|
GCRIDP-3
|
rangunia
|
415705151
|
3.03
|
8.75
|
|
316.46
|
A ALI -AKHI-AI AMIN (JV)
|
362.35
|
14/01/2020
|
|
21/11/2020
|
65
|
190.00
|
|
03/01/2021
|
|
756
|
GCP-3/Ctg/WM-38
|
Periodic Maintenance of Sawnirvar Rangunia UP-TC Hat-Hosnabad UP (Ram Mohansikder Road) Road by BC
|
GCRIDP-3
|
rangunia
|
415703007
|
1.51
|
|
|
39.84
|
M/S. SHOHAG ENTERPRISE
|
37.84
|
08/06/2020
|
|
15/02/2021
|
0
|
|
|
03/01/2021
|
|
757
|
GCP-3/Ctg/WM-34
|
Periodic Maintenance of Dovashi Bazar GC-Kodala UP-Shilok UP-Sarfvata UP-RHD- Godown (Hazee Sayed Ali Road) Road by BC
|
GCRIDP-3
|
rangunia
|
415702004
|
6.34
|
|
|
162.06
|
M/S. A ALI CHOWDHURY
|
161.24
|
05/07/2020
|
|
12/02/2021
|
0
|
|
|
03/01/2021
|
|
758
|
GCP-3/Ctg/WD-102
|
Development of RHD Shantinikaton Bazar Bommotar Nurul Ulum Madrasha-TC Hat (Korban ali Road & Nobo Chandra Road) by BC at ch: 1204-2765m.
|
GCRIDP-3
|
rangunia
|
415704001
|
1.45
|
27.60
|
|
250.58
|
|
286.37
|
21/07/2020
|
|
28/07/2021
|
10
|
|
|
03/01/2021
|
|
759
|
GCP-3/Ctg/WD-205
|
Development of Godown Bridge-Kalurghat Road (Muktijudddah Ali Akbor Road) by RCC at ch: 0+000-0+560km.
|
GCRIDP-3
|
rangunia
|
415705592
|
|
|
|
51.37
|
|
48.79
|
29/09/2020
|
|
06/05/2021
|
0
|
|
|
03/01/2021
|
|
760
|
GCP-3/Ctg/WD-172
|
Improvement of Padua Rajar Hat-Kamalachari GPS-RHD Bridge Ghat (Khurushia Abdul Hamid Road) Road by BC at Ch: 0+000-4+000km.
|
GCRIDP-3
|
rangunia
|
415704013
|
4.00
|
12.00
|
|
457.73
|
|
489.92
|
21/10/2020
|
|
28/10/2021
|
0
|
|
|
03/01/2021
|
|
761
|
GCP-3/Ctg/WM-36
|
Periodic Maintenance of R&H Ghatcheek-Rajarhat GC-Ranirhat GC (Parua DC Road) by BC at ch: 7+000-14+130km.
|
GCRIDP-3
|
rangunia
|
415702007
|
7.13
|
|
|
249.26
|
|
256.74
|
01/11/2020
|
|
08/06/2021
|
0
|
|
|
03/01/2021
|
|
762
|
GCP-3/Ctg/WD-97
|
Development of RHD Pattartila-Moulubir Tila-Kolompoti Bazar GC Road by BC (Rangunia Part) at ch.0+000-4+072km.
|
GCRIDP-3
|
rangunia
|
415702015
|
3.93
|
12.75
|
|
481.48
|
|
0.00
|
|
|
|
0
|
|
|
03/01/2021
|
|
763
|
GCP-3/Ctg/WD-98
|
A) Development of Sawnirvar Rangunia UP-TC Hat-Hosnsbad UP (Ram Mohan Sikder Road) at ch.1+529-3+104km. B) Improvement of Sayedul Haq Kabiraj Village Road by HBB at Ch: 0+000-1+003km.
|
GCRIDP-3
|
rangunia
|
415703007, 415705019
|
2.54
|
22.45
|
|
307.94
|
|
0.00
|
|
|
|
0
|
|
|
03/01/2021
|
|
764
|
GCP-3/ctg/WD-17
|
Kala Miah Road
|
GCRIDP-3
|
raojan
|
415744061
|
1.35
|
0.62
|
100
|
170.02
|
M/s S M Trading
|
177.67
|
30/07/2018
|
|
06/06/2019
|
100
|
177.52
|
100
|
03/01/2021
|
|
765
|
GCP-3/ctg/WD-18
|
Amir para road (Hafez Bazlur Rahman Road to Amirpara
|
GCRIDP-3
|
raojan
|
415744111
|
1.04
|
1.30
|
0
|
140.25
|
M/s ShahJabbariaConstruction & Co
|
147.27
|
29/07/2018
|
|
30/11/2019
|
100
|
135.61
|
0
|
03/01/2021
|
|
766
|
GCP-3/ctg/WD-20
|
Kulal para road ( Kodolpur UP) (Amir Para)
|
GCRIDP-3
|
raojan
|
41575015
|
0.88
|
5.00
|
100
|
81.51
|
M/sM N Traders
|
85.59
|
16/08/2018
|
|
25/03/2020
|
100
|
85.31
|
100
|
03/01/2021
|
|
767
|
GCP-3/ctg/WD-19
|
Shahid jafar Road (R&H) Dabua Rubber Garden via Hingola Mucha shah mazar (Dabua Rubber Gurden road)
|
GCRIDP-3
|
raojan
|
415744041
|
1.00
|
0.62
|
0
|
70.58
|
M/s ChowdhuryEnterprise,
|
74.12
|
20/08/2018
|
|
24/10/2019
|
70
|
49.84
|
0
|
03/01/2021
|
|
768
|
GCP-3/ctg/WD-33
|
A)Mozlish Bari Road (Via Naki
Miaji Bari)
B) Mobarak ali road.
|
GCRIDP-3
|
raojan
|
415745404,415745187
|
1.58
|
11.40
|
100
|
239.59
|
M/s Iqbal &Brothers
|
257.25
|
12/11/2018
|
|
13/11/2019
|
100
|
254.89
|
100
|
03/01/2021
|
|
769
|
GCP-3/ctg/WD-21
|
Improvement of Noapara Ovalong Road
|
GCRIDP-3
|
raojan
|
415745266
|
2.15
|
6.30
|
100
|
255.36
|
M/S. Iqbal & Brothers- Shah Amanat Enterprise (JV)
|
276.26
|
06/02/2019
|
|
13/02/2020
|
100
|
276.21
|
100
|
03/01/2021
|
|
770
|
GCP-3/ctg/WD-16
|
Improvement of Shair Mohammad Road (Kadalpur)
|
GCRIDP-3
|
raojan
|
415745185
|
0.47
|
2.62
|
0
|
43.95
|
M/S. Benchmark Construction
|
46.15
|
15/12/2019
|
|
22/07/2020
|
60
|
|
0
|
03/01/2021
|
|
771
|
GCP-3/Ctg/WM-23
|
Maintenance of Ramjan Ali Hat G.C – Noapara Pather hat (R&H) Road (Rouzan Noapara Sec-2)
|
GCRIDP-3
|
raojan
|
415742003
|
5.06
|
|
100
|
171.99
|
M/S. Shah Amanat Enterprise
|
171.59
|
14/03/2019
|
|
10/08/2019
|
100
|
162.18
|
100
|
03/01/2021
|
|
772
|
GCP-3/Ctg/WD-39
|
A) Improvement of Gourisankar Hat GC Ramchandra Bazar RHD via New Roghunandan Road
B)Improvement of R.D Mphammadia Road Paharoli Dewanpur Pathan Pra Road
|
GCRIDP-3
|
raojan
|
415742012,415744116
|
2.20
|
7.65
|
0
|
349.28
|
M/s. I S Trading
|
355.18
|
06/01/2019
|
|
25/03/2020
|
50
|
120.00
|
0
|
03/01/2021
|
|
773
|
GCP-3/Ctg/WD-68
|
A) Development of Chittagong-Rangamati (R&H) Road-Chikdair UP (Shaheb Bari Road)
B) Development of Saf Langa No-1 Road
|
GCRIDP-3
|
raojan
|
415744076,415745131
|
1.96
|
2.00
|
0
|
258.39
|
M/s. Riton Enterprise
|
258.39
|
04/02/2019
|
|
05/04/2020
|
100
|
235.08
|
0
|
03/01/2021
|
|
774
|
GCP-3/Ctg/WD-77
|
A) Development of Pachim Gahira Brick Field RHD-Mohammed Towkir hat GC (Raozan Part) by BC.
B)Development of Dost Mohammed (UZR) Hingula Musa Shah Majar & Bazar (LM) Riad (Kash Khali Dabua Hingolla Road) by HBB
C)Development of khan Bahadur Abdul Jabber Road-2 kagotia hat (LM) via Sonair Muk Road (West Binajuri Sonair Muk Road) by BC.
|
GCRIDP-3
|
raojan
|
415742013, 415745032,415744022
|
3.15
|
1.25
|
|
282.19
|
M/S. Pubali Traders
|
281.66
|
05/03/2019
|
|
30/12/2020
|
100
|
271.76
|
|
03/01/2021
|
|
775
|
GCP-3/Ctg/WD-79
|
A) Development of Raozan-Noapara Section-1 (R&H) at Chitiapara-Raozan-Noapara Sec-1(R&H) at kagotia Hat (LM) via Lalangara Para Road (Lalangara Para Road) by BC
B) Development of Shahid Jafar (R&H Road Brikka Bhanupur Bazar (LM) Road (Brindaban Para Road) by HBB
|
GCRIDP-3
|
raojan
|
415744027,415745038
|
3.00
|
11.00
|
|
235.95
|
M/S. Pubali Traders
|
235.52
|
05/03/2019
|
|
30/12/2020
|
65
|
119.50
|
|
03/01/2021
|
|
776
|
GCP-3/Ctg/WD-103
|
Development of Samsher Para road (Kadalpur) by RCC.
Development of Kadalpur Feda Gazir Bari Road-Nurali Munsi Road by RCC
|
GCRIDP-3
|
raojan
|
415745192, 415744135
|
1.41
|
2.62
|
|
213.87
|
M/S. KAHEM ENTERPRISE
|
213.68
|
28/07/2019
|
|
04/08/2020
|
80
|
114.77
|
|
03/01/2021
|
|
777
|
GCP-3/Ctg/WD-106
|
Development of Dost Mohammed Road (UZR) Akber Sha (UNR) Road at Gonir Ghat (Md. Amir Road) by BC
|
GCRIDP-3
|
raojan
|
415744007
|
0.50
|
0.60
|
|
35.17
|
M/S TASPIYA ENTERPRISE
|
36.91
|
15/12/2019
|
|
22/09/2020
|
70
|
22.75
|
|
03/01/2021
|
|
778
|
GCP-3/Ctg/WD-124
|
Development of Nowapara Paloan Para Nurani Madrasha Road by RCC
|
GCRIDP-3
|
raojan
|
415745573
|
0.73
|
1.25
|
|
117.21
|
M/S. K ALAM TRADERS
|
123.06
|
12/12/2019
|
|
27/12/2020
|
90
|
89.42
|
|
03/01/2021
|
|
779
|
GCP-3/Ctg/WD-123
|
Development of Bama Charan Road (East Guzra) by RCC
|
GCRIDP-3
|
raojan
|
415745219
|
1.00
|
1.25
|
|
157.18
|
M/S. BAIZID
|
168.18
|
29/01/2020
|
|
30/12/2020
|
90
|
116.00
|
|
03/01/2021
|
|
780
|
GCP-3/Ctg/WD-161
|
Improvement of Noajishpur Dabua Road (Gohira heaco Road to Dabua Gonirghat Bridge) by RCC
|
GCRIDP-3
|
raojan
|
415744099
|
0.80
|
0.62
|
|
128.55
|
M/S. S M TRADING
|
128.47
|
08/06/2020
|
|
15/01/2021
|
100
|
60.00
|
|
03/01/2021
|
|
781
|
GCP-3/Ctg/WD-160
|
Improvement of Bagon Bhupesh Barua Bari Road by RCC at ch: 0+000-0+951km.
|
GCRIDP-3
|
raojan
|
415745486
|
0.95
|
3.00
|
|
175.93
|
|
175.78
|
28/10/2020
|
|
04/07/2021
|
0
|
|
|
03/01/2021
|
|
782
|
GCP-3/Ctg/WD-213
|
Construction of 1 x 3.50 x 3.50m RCC Box Culvert at Ch: 118.00m on Kulal para Road (Kodolpur UP)
|
GCRIDP-3
|
raojan
|
415745015
|
|
3.50
|
|
31.25
|
|
32.77
|
|
|
|
0
|
|
|
03/01/2021
|
|
783
|
GCP-3/Ctg/WD-216
|
Development of Rawali Road (UZR)-Oli Mia Hat LM. Bara Takur Para Road) by RCC at ch: 740-1409km.
|
GCRIDP-3
|
raojan
|
415744001
|
0.68
|
0.60
|
|
107.12
|
|
101.76
|
|
|
|
0
|
|
|
03/01/2021
|
|
784
|
GCP-3/Ctg/WD-217
|
Development of Chattogram-Kaptai (R&H) Road-Zia Bazar (LM) via Modon Jungle) Madunaghat Road (Modon Jungle) by RCC at ch: 560-1226m.
|
GCRIDP-3
|
raojan
|
415744066
|
0.67
|
1.20
|
|
106.64
|
|
101.30
|
|
|
|
0
|
|
|
03/01/2021
|
|
785
|
GCP-3/Ctg/WD-218
|
Development of Vot Pukuria Hazrat Nojir Ahamed Shah Road-Shahid Jafar Road by HBB at ch: 732-1652km.
|
GCRIDP-3
|
raojan
|
415744151
|
0.92
|
1.80
|
|
74.87
|
|
45.47
|
|
|
|
0
|
|
|
03/01/2021
|
|
786
|
GCP-3/Ctg/WD-125
|
Development of Kachu Khain Abdul Nabi Road (Noapara) by RCC at ch: 0+000-1+000km.
|
GCRIDP-3
|
raojan
|
415745271
|
1.00
|
|
|
148.52
|
|
0.00
|
|
|
|
0
|
|
|
03/01/2021
|
|
787
|
GCP-3/Ctg/WD-221
|
Improvement of Moulana Sirajuddin road (Nazim Building to M.Farid ahammed Bari Road) by HBB at ch: 350-630m.
|
GCRIDP-3
|
raojan
|
415745210
|
0.28
|
|
|
13.81
|
|
0.00
|
|
|
|
0
|
|
|
03/01/2021
|
|
788
|
GCP-3/Ctg/WM-09
|
A)Maintenance of
Harish Pur Union Parishad-Salam Bazar Road
B)Maintenance of Embacment to Circular Road via Adarsho Para GPS & Shiberhat GC (Abul Khair Khan Satgoria Road)
|
GCRIDP-3
|
sandwip
|
415783010,415783018
|
1.46
|
|
100
|
136.86
|
Md. Zakir hossain
|
192.54
|
23/12/2018
|
|
15/09/2019
|
100
|
128.92
|
100
|
03/01/2021
|
|
789
|
GCP-3/Ctg/WD-82
|
A) Improvement of Panditer Hat & RHD Road to Embnmkent via kamala maitbanga Road (Alam khushi Road) by RCC
B) Improvement of Banir hat (H/O Rafiq Compani) to Bosidia Road via RHD & Ershad Market (Gasua Bauris boarder) by RCC
|
GCRIDP-3
|
sandwip
|
415784016, 415784003
|
1.21
|
|
100
|
160.85
|
M/S. S R Enterprise
|
152.81
|
03/03/2019
|
|
09/03/2020
|
100
|
137.00
|
100
|
03/01/2021
|
|
790
|
GCP-3/Ctg/WD-81
|
A) Improvement of Freedom Fighter Akram Khan Dulal Road (Mollah Road) by RCC
B) Improvement of Embakment to Circuler Road via Adarsho Para GPS & Shiberhat GC (Abul Khair Khan Satgoria Road) by RCC
C) Improvement of RHD Road (Malak Munshi Bazar) to Moulavi Bazar (Badalia Road) by RCC
|
GCRIDP-3
|
sandwip
|
415784017,415783018,415784015
|
2.25
|
|
|
300.18
|
Mohammed Eunus & Brothers (Pvt.) Ltd.
|
300.08
|
15/04/2019
|
|
30/11/2020
|
100
|
252.28
|
|
03/01/2021
|
|
791
|
GCP-3/Ctg/WD-38
|
Improvement of Bangla Bazar to Tonasa Road (Mafiz Mikter road) by RCC.
Improvement of Bauria Harishpur Road (H/O) Moulovi Shamsul Huda ) to Banir hat ( Moulovi Shamsul Huda Road) by RC
Improvement of Harishpur Up to Embankment via Dwipallo GPS RHD Road (Modhya Bauria Road) by RCC
Improvement of Musapur Chowmuhani Bazar to Mogdhara up Amtoli bazar via Chowdhury bazar Maitbanga up (DB Road) by RCC
Improvement of Palisher Hat GC to Embacment (Palisher road) by RCC
Improvement of Sandwip Upazila Sontospur up to Companigong Ghat (Noakhali) Road via Dirgapur UP & urir char UP (Sandwip Char Elahi Connecting Road) by RCC
|
GCRIDP-3
|
sandwip
|
415785013,415784002,415784004,415783005,415783011,415782002
|
3.42
|
|
|
324.19
|
M/S A. ALI CHOWDHURY
|
305.44
|
12/12/2018
|
|
15/07/2020
|
90
|
207.39
|
|
03/01/2021
|
|
792
|
GCP-3/Ctg/WD-80
|
A) Improvement of Ammanullah UP to Doamkhali ferry ghat via RHD Road (Doamkhali ferry ghat Road) by RCC
B) Improvement of Palashar Bazer GC to Sheber hat GC (RHD) Road via Amtoli Bazar & Janata bazar Road (Kamala & Dhopergopart Road) by RCC
|
GCRIDP-3
|
sandwip
|
415784001,415782005
|
2.75
|
|
|
409.69
|
Mohammad younus & brothers
|
421.99
|
30/06/2019
|
|
20/11/2020
|
50
|
157.00
|
|
03/01/2021
|
|
793
|
GCP-3/Ctg/WD-146
|
Development of Harish pur Union Parishad-Salam Bazar Road by RCC
|
GCRIDP-3
|
sandwip
|
415783010
|
0.60
|
|
|
101.85
|
M/S SANDWIP BUILDERS
|
96.76
|
01/03/2020
|
|
08/09/2020
|
0
|
|
|
03/01/2021
|
|
794
|
GCP-3/Ctg/WD-145
|
Development of Chwmuhani Road (Pouroshava Market) to Akbor Hat via Banir Hat (Cross Road) Road by RCC
|
GCRIDP-3
|
sandwip
|
415784058
|
1.00
|
|
|
170.20
|
M/S MOHSHIN & BROTHERS & M/S SAMIHA ENTERPRISE (JV)
|
170.10
|
19/05/2020
|
|
26/11/2020
|
0
|
|
|
03/01/2021
|
|
795
|
GCP-3/Ctg/WD-52
|
Development of Madrasha-Sonakania Gravyeard Road
|
GCRIDP-3
|
satkania
|
415824034
|
1.06
|
7.25
|
0
|
93.27
|
M/s. Alam Enterprise
|
97.47
|
22/01/2019
|
|
10/10/2019
|
90
|
50.00
|
0
|
03/01/2021
|
|
796
|
GCP-3/Ctg/WM-10
|
Maintenance of Upazila Headquarter-Keranihat GC road
|
GCRIDP-3
|
satkania
|
415822003
|
3.66
|
3.00
|
0
|
218.44
|
M/s Md. Faruq
|
207.52
|
27/12/2018
|
|
30/09/2019
|
100
|
191.12
|
0
|
03/01/2021
|
|
797
|
GCP-3/Ctg/WD-35
|
Development of Rampur Madrasha Shikder Para Road
|
GCRIDP-3
|
satkania
|
415824038
|
0.74
|
12.62
|
0
|
91.70
|
M/S. S M Yousuf Brothers
|
87.12
|
24/06/2019
|
|
30/06/2020
|
95
|
55.00
|
0
|
03/01/2021
|
|
798
|
GCP-3/Ctg/WD-36
|
Developement of Gatiadanga -Deodighi-Mirjakhil Road (From RHD #146)
|
GCRIDP-3
|
satkania
|
415822009
|
1.19
|
6.00
|
0
|
152.83
|
M/S. ADS Builders
|
145.19
|
17/09/2019
|
|
20/09/2020
|
65
|
60.23
|
0
|
03/01/2021
|
|
799
|
GCP-3/Ctg/WD-91
|
Development of Mirza Jabal Road by HBB
|
GCRIDP-3
|
satkania
|
415825011
|
0.73
|
2.00
|
|
43.04
|
M/S. M A S K Construction
|
40.89
|
14/05/2019
|
|
21/12/2019
|
10
|
13.60
|
|
03/01/2021
|
|
800
|
GCP-3/Ctg/WD-112
|
Development of Satkania U.P-Tayari Hat Bazar GC (Lohagora) Road from
|
GCRIDP-3
|
satkania
|
415823004
|
1.00
|
|
|
91.43
|
M/S. J K ENTERPRISE
|
86.86
|
19/11/2019
|
|
25/07/2020
|
60
|
40.00
|
|
03/01/2021
|
|
801
|
GCP-3/Ctg/WD-116
|
A) Development of Amilaish Char Para-Datta Ghat Road by BC .
B) Development of West Amilaish GPS-Khar Mosjid Road by HBB.
|
GCRIDP-3
|
satkania
|
415824018,415824065
|
1.55
|
9.50
|
|
125.80
|
S ANANTA BIKASH TRIPURA
|
130.79
|
30/01/2020
|
|
06/10/2020
|
50
|
24.00
|
|
03/01/2021
|
|
802
|
GCP-3/Ctg/WD-122
|
Development of Bomang Hat GC-Mithadighi (RHD) via Sadaha UPC Road by BC .
|
GCRIDP-3
|
satkania
|
415823014
|
2.00
|
3.12
|
|
188.29
|
M/S. ABSAR CONSTRION
|
186.87
|
29/01/2020
|
|
04/10/2020
|
55
|
50.00
|
|
03/01/2021
|
|
803
|
GCP-3/Ctg/WD-48
|
Develoment of Sadaha UP-Dostidar Hat Road by BC
|
GCRIDP-3
|
satkania
|
415823007
|
0.70
|
5.25
|
|
100.59
|
M/S. MOHSHIN & BROTHERS
|
95.56
|
25/03/2020
|
|
30/10/2020
|
40
|
|
|
03/01/2021
|
|
804
|
GCP-3/Ctg/WM-39
|
Maintenance of Nalua-Satkania Road via Nalua Hadar Khal Bridge at 1.00km & Gatiadanga High School at Ch: 8.00km of Charati-Khoderhat-Noyahat-Bazalia (From RHD# 143) Road by BC at ch: 0-200m, 340-550 & 870-2500m. RCC at ch: 200-340m & 550-870m
|
GCRIDP-3
|
satkania
|
415822007
|
2.46
|
|
|
113.77
|
M/S BLUE BIRDS
|
108.09
|
01/07/2020
|
|
02/03/2021
|
65
|
62.50
|
|
03/01/2021
|
|
805
|
GCP-3/ctg/WD-30
|
Postim Sayed Pur Auntar khali - Mirer Hat Road.
|
GCRIDP-3
|
sitakunda
|
415864020,415864044,415864108,415864131,415864151
|
0.98
|
4.20
|
|
242.79
|
|
0.00
|
|
|
|
0
|
|
|
03/01/2021
|
|
806
|
GCP-3/Ctg/WM-06
|
A)Maintenance of Mojid Mullah-Tofjolia Dhalipara Hasnabad road
B)Maintenance of Chotodarogerhat RHD-Sohasra Dhara Road
C)Maintenance of Mogpukira Road
|
GCRIDP-3
|
sitakunda
|
415864071,415864077,415865081
|
3.71
|
2.00
|
100
|
101.48
|
M/s. Hassan Motors
|
96.40
|
17/01/2019
|
|
30/10/2020
|
100
|
95.67
|
100
|
03/01/2021
|
|
807
|
GCP-3/Ctg/WM-05
|
A)Maintenance of Modhya Bogachator Cyclone Shelter Road
B)Maintenance of Mirer Hat GC Road- Sandwip Ferry Ghat Road (Mirer Hat GC) Road
C)Maintenance of Zinnat Ali Road
|
GCRIDP-3
|
sitakunda
|
415865169,415864123,415864075
|
4.45
|
5.40
|
100
|
130.68
|
M/s Stapathi Design & Consultant
|
124.14
|
13/01/2019
|
|
05/06/2019
|
100
|
124.14
|
100
|
03/01/2021
|
|
808
|
GCP-3/Ctg/WD-156
|
Improvement of Bhatiary Sunsade Point RHD-Dhaka Chattogram Road RHD via BMA High School Road by BC
|
GCRIDP-3
|
sitakunda
|
415864181
|
1.66
|
7.50
|
|
397.24
|
M/S JEWEL ENTERPRISE
|
405.01
|
19/05/2020
|
|
26/05/2021
|
0
|
|
|
03/01/2021
|
|
809
|
GCP-3/Ctg/WD-182
|
Development of Uttor Bohachattor Oli Ahammed (Raja Miah Chdry) Road by BC
|
GCRIDP-3
|
sitakunda
|
415864148
|
1.00
|
6.30
|
|
97.22
|
M/S THREE STAR ENTERPRISE
|
102.08
|
03/06/2020
|
|
27/12/2020
|
10
|
|
|
03/01/2021
|
|
810
|
GCP-3/Ctg/WD-73
|
Improvement of Middle Shikalbaha GPS-Kalarpool GPS Road (Wahidia Road) by RCC at ch: 0+000-1+400km.
|
GCRIDP-3
|
sitakunda
|
415614031
|
2.03
|
9.80
|
|
194.04
|
|
0.00
|
|
|
|
0
|
|
|
03/01/2021
|
|
811
|
WD-CHITTA-BANSKHALI/W-01
|
Development of Gondamara Bridge to Gondamara Power Plant Connecting Road (2-Lane Road with 4-Lane Structure Including Sub-GradeImprovement by PVD & other ancillary Works)
|
GPPCRP
|
banskhali
|
415084120
|
2.52
|
|
60
|
2013.51
|
M.A.H Construction Ltd-M/s J K Enterprise (jv)
|
2153.34
|
10/04/2018
|
|
30/03/2021
|
70
|
1459.24
|
60
|
03/01/2021
|
|
812
|
GSIDP/CTG/DW-38
|
Improvement of Garibullha Sha Mosque Eidgha Under 8 no Durgapur Union, Latitude: 22.8232, Longitude: 91.5552
|
GSIDP
|
mirsharai
|
|
|
|
|
5.00
|
M/S Fabia Traders
|
9.49
|
06/08/2018
|
|
13/11/2018
|
100
|
4.67
|
|
19/03/2019
|
|
813
|
GSIDP/CTG/DW-39
|
Improvement of Mithachara Eidgha Under 9 no Mirshrai Union, Latitude: 22.8087, Longitude: 91.5514
|
GSIDP
|
mirsharai
|
|
|
|
100
|
9.99
|
M/S Adian Enterprise
|
0.00
|
28/07/2019
|
|
11/12/2018
|
100
|
9.49
|
100
|
19/03/2019
|
|
814
|
GSIDP/CTG/DW-41
|
Improvement of Moghadia Hindu Para Sarbojonin Durga Mondir Under 11 no Moghadia Union, Latitude: 22.7501, Longitude: 91.5338
|
GSIDP
|
mirsharai
|
|
|
|
100
|
5.00
|
Sajia Trading
|
9.50
|
26/07/2018
|
|
11/01/2018
|
100
|
4.74
|
100
|
19/03/2019
|
|
815
|
GSIDP/CTG/DW-43
|
Improvement of Dakin Muradpur Eidgah Under 14 no Haitkandi Union, Latitude: 22.6997, Longitude: 91.4992
|
GSIDP
|
mirsharai
|
|
|
|
100
|
10.00
|
M/S Fabia Traders
|
19.00
|
06/08/2018
|
|
15/10/2018
|
100
|
9.50
|
100
|
19/03/2019
|
|
816
|
GSIDP/CTG/DW-40
|
Improvement of Abu Torab Sree Sree Jaghonnath Mondir Under 11 no Moghadia Union, Latitude: 22.7487, Longitude: 91.5569
|
GSIDP
|
mirsharai
|
|
|
|
0
|
5.01
|
M/S. S.R Enterprise
|
9.52
|
22/11/2018
|
|
28/02/2019
|
100
|
0.00
|
0
|
19/03/2019
|
|
817
|
IRIDP-2/CTG/DW-1
|
a) Improvement of Nanupur UPC Doulat Munshirhat Bazar (Nanupur-Khiram) Road from Ch. 3900-6262m.b) Construction of 1X2.00mx2.00m culvert at ch.6210m on the same road.
|
IRIDP-2
|
fatikchari
|
|
2.36
|
|
|
185.21
|
M/s R.N Enterprise.
|
185.20
|
|
|
|
0
|
|
|
|
|
818
|
IRIDP-2/CTG/DW-2
|
a) Improvement of Shaheed Ahammed Safa Road from Ch: 00-2000m.b) Construction of 1 No 4-vent 4.50x5.00m RCC Box culvert at Ch. 750m on the same road.
|
IRIDP-2
|
fatikchari
|
|
2.00
|
|
|
90.55
|
M/s. Elias Brothers, Prop: Mohammad Elias Chowdhury
|