1
|
NCC2-01
|
a) Improvement of Bhasha Sainik Sarak by RCC with Footpath cum RCC drains in ward no-13 (Ch 0+00 to 0+400.00m),
b) Construction of CC road with RCC drain beside Paikpara Big Graveyard in ward no-17 & 18 (Ch 0+00 to 0+700.00m),
c)Construction of RCC road & Drain starting from Shantibag Stadium road near EURO Garments upto north line of Islam Nagar WAPDA canal in ward No:08 (Ch 0+00 to 0+ 615m ) .
|
CGP
|
narayanganj-s
|
|
4.13
|
|
|
711.25
|
MAM Construction Ltd
|
674.79
|
|
12/07/2017
|
30/11/2018
|
0
|
|
|
|
|
2
|
NCC2-02
|
a) Re-habilitation of road & drain with link from lithi garmentsd to dhaka-Chittagong highway road vai london market & Nemai kaisari bazer by RCC in ward-03 Length 1582 & 8 nos.
Link road length:2796.0m Total Effective length4378.0m
|
CGP
|
narayanganj-s
|
|
11.39
|
|
|
1931.42
|
M/S Ratna Enterprise
|
1693.74
|
|
08/10/2017
|
08/11/2018
|
0
|
|
|
|
|
3
|
NCC2-03
|
Re-construction of road by RCC with Road Side RCC Drain, from Nobiganj Bazar to Dakesshay Mill. Ch(00-4432m) including some Links
|
CGP
|
narayanganj-s
|
|
16.05
|
|
|
2841.86
|
Rana Builders & Hasan Builders (JV)
|
2700.33
|
|
23/05/2017
|
31/12/2018
|
0
|
|
|
|
|
4
|
NCC2-04
|
a) Construction of 18m etre span RCC Tribini Bridge over Tribini Khal on Madanganj power grid to Nabigonj bus stand Road at Chainage 1+735 m. Ward-21 b)Construction of 20m metre span RCC Baparipara Bridge over Baparipara Khal on Madanganj power grid to Nabigonj bus stand Road at Chainage 0+370 m.
|
CGP
|
narayanganj-s
|
|
0.04
|
|
|
892.12
|
Prominent -Quashem (JV)
|
779.16
|
|
05/03/2017
|
31/12/2018
|
0
|
|
|
|
|
5
|
NCC2-05
|
a) Construction of 15m long RCC bridge over WAPDA canal near Lithigarments at ward no-3,; 14m long RCC bridge (Abdul Ali pool) at ward no-2, 10m long RCC culvert near Rahim market at ward-02, b) Reconstruction of 60m long RCC birdge over Shitalakkhya Khal at Shaheed Nagar in ward no-18
c) Reconstruction of 60m long RCC bridge over Shitalakkhya khal at Sayedpur in ward no-18,
d) Construction of 12m long RCC bridge over Nolkhali Khal near Knit conern at ward no-10.
|
CGP
|
narayanganj-s
|
|
0.13
|
|
|
2098.27
|
Prominent -Quashem (JV)
|
1845.95
|
|
05/03/2017
|
31/12/2018
|
0
|
|
|
|
|
6
|
NCC2-06
|
Construction of 20m span RCC Luhia Bridge over Nabiganj Khal on Nobiganj Bazar to Dakesshay Mill Road at Chainage 0+350m and 22m span RCC Lakankhola Brige over Lakhankhola Khal on Nobiganj Bazar to Dakesshay Mill Road at Chainage 2+750.
|
CGP
|
narayanganj-s
|
|
0.04
|
|
|
556.34
|
Prominent -Quashem (JV)
|
482.36
|
|
05/03/2017
|
31/10/2018
|
0
|
|
|
|
|
7
|
NCC2-10
|
(i) Construction of 40.00m long RCC foot over bridge over WAPDA main canal at Ch.0+280km (ii) Construction of 33.00m long RCC bridge over WAPDA main canal at Ch.1+200km (iii) Construction of 38.00m long RCC bridge over WAPDA main canal at Ch.2+130km (iv) Construction of 46.25m long RCC foot over bridge over WAPDA main canal at Ch.2+630km (v) Construction of 34.00m long RCC bridge over WAPDA main canal at Ch. 3+550km (vi) Construction of 37.00m long RCC foot over bridege over WAPDA main canal at Ch.5+150km.
|
CGP
|
narayanganj-s
|
|
0.23
|
|
|
3813.80
|
Mir Habibul Alam-Udayan Builders(JV)
|
3584.87
|
|
25/11/2018
|
19/03/2020
|
0
|
|
|
|
|
8
|
NCC2-11
|
Re-construction of road by RCC with Road Side RCC Drain, from Nobiganj Bazar to Dakesshay Mill. Ch(00-4432m) including some Links
|
CGP
|
narayanganj-s
|
|
3.91
|
|
|
791.31
|
M/S Munia Traders
|
749.43
|
|
23/05/2017
|
17/10/2018
|
0
|
|
|
|
|
9
|
NCC2-12
|
a) Re-construction of Road and Drain by RCC starting from AEPZ Road to Sumilpara Road in ward No-06 at Ch.000 to 0646.
b) Re-construction of Char Sumilpara road by RCC with RCC drain in ward No06 Length350m & 6 nos link road length 1099m total effective length1449m.
c) Re-construction of RCC road with RCC drain from Kaiums house to Noardapara moszid in ward no-24 Length86m & 1 Nos Link Road Length134m Total Effective length220m.
d) Construction of Road by RCC with side drain in Shitolankha housing under Ward no.11including 4 Nos Link Road Effective length674m.
e) Re-construction of drain & road by RCC from 100-0 road to Baitul Mamur Madrasha via Roman house beside Kadamrasul College in ward no-23Length400m & 1 Nos Link Road Length117m Total Effective length517m.
f) Re-construction of RCC road with RCC drain from Bugbari Bus road to Bhandary bari in ward no-23 (Ch.000 to 0480).
|
CGP
|
narayanganj-s
|
|
8.61
|
|
|
1180.24
|
Starline Services Limited
|
1068.11
|
|
08/10/2017
|
13/12/2018
|
0
|
|
|
|
|
10
|
NCC2-07
|
Re-excavation of main canal from bhangar poll to Shimrail galakata bridge along with Protective Works by CC Block lining at west side of the main canal in Siddhirganj (Ch.0+000km to 5+538Km) at both sides.
|
CGP
|
narayanganj-s
|
|
5.20
|
|
|
5834.50
|
|
0.00
|
|
|
|
0
|
|
|
|
|
11
|
NCC2-09
|
a) Construction of RCC Drain Starting from Godnail Lal Building to Anayetnagar Lacky Bazzar Ch.0+000-2+505.
(b) Construction of Drain (RCC/Brick/Pipe) Starting from Tatkhana more upto WAPDA Canal via Sayedpara wooden bridge, sayedpara kafil uddin Garments & the H/O mr. shamim at ward no.-08. Ch.0+000-0+670. (Total Length with 7 link drain=1616.0m) (c) Construction of RCC Drain(RCC/Brick/Pipe) Starting from Tatkhana Government Primary school to Chowdhuri bari road via Dr. Kuddus house at word no.-8. Ch.0+000-0+292 & Link Ch.0+000-0+100. (d) Construction of RCC Drain(RCC/Brick/Pipe) Starting from Starting from Dhanakunda Saudbari to rail line & Barepara Aklim Mia House at ward No.-08. Ch.0+000-0+170. (e) Construction of drain (RCC/Brick/Pipe) starting from Modhugar connecting upto WAPDA canal at ward no-08.Ch.0+000-0+356. Total Length (including 8 nos. Link Drain)=1840m. (f) Construction of Drain (RCC/Brick/Pipe) at Jhalkuri Starting from amtala mor to wapda canal via east side & Jhalkuri khola market at word no.-9. Ch.0+000-0+735, Ch.0+000-0+493(Link-1), Ch.0+000-0+288(Link-2). (g) Construction of Drain (RCC/Brick/Pipe) at Jhalkuri Starting from Jalkuri Naintarpar to Karoitala via Firoz Master House at ward no.-09. Ch.0+000-0+650, Ch.0+000-0+599(Link-1), Ch.0+000-0+100(Link-2), Ch.0+000-0+118(Link-3). (h) Construction of drain (RCC/Brick/Pipe) at Jalkuri starting from Jalkuri Wapda canal Culvert to end of NCC & Goramara Mosque-E-Noor via Rajmahal Chinema Hall at ward no-9. Ch.0+000-0+225, Total Length (including Link drain)=837m. (i) Construction of Drain (RCC/Brick/Pipe) at Jhalkuri Starting from Jalkuri Transmeter to Sheikderbari pool via Taher Ali House & Jalkuri Graveyard at ward no.-9. Ch.0+000-0+580. Ch.0+000-0+580(Link-1), Ch.0+000-0+190(Link-2) (j) Construction of Drain (RCC/Brick/Pipe) at Jhalkuri Starting from Modhugar Mojibor Poulty firm to Wapda canal near Ali Hossain House via Dewan Jame Mosque at ward no-9. Ch.0+000-0+400, Ch.0+000-0+370(Link-1), Ch.0+000-0+580(Link-2)
|
CGP
|
narayanganj-s
|
|
12.87
|
|
|
2144.52
|
Mir Habibul Alam-Udayan Builders(JV)
|
1917.36
|
|
10/08/2017
|
13/12/2018
|
0
|
|
|
|
|
12
|
CIB-Nar-W-35
|
Const. of 320m long PSC Girder Bridge over the river Balu at Ch. 00.00m on Porshi G.C-Rupganj-Kayetpara -Demra RHD road at Isapura under Rupganj Upazila, District: Narayanganj.
|
CIBRR
|
rupganj
|
[Road ID: 367682001]
|
|
320.00
|
69
|
3807.66
|
M/S Prominent-Qushem-PPL(JV)
|
3888.20
|
07/08/2018
|
13/08/2018
|
31/08/2024
|
82
|
2718.31
|
69
|
04/08/2024
|
|
13
|
CIB-Nar-W-35(b)
|
Const. of 250m Vaiduct of 320m long PSC Girder Bridge over the river Balu at Ch. 00.00m on Porshi G.C-Rupganj-Kayetpara -Demra RHD road at Isapura Part under Rupganj Upazila, District: Narayanganj.
|
CIBRR
|
rupganj
|
367682001
|
|
250.00
|
21
|
2444.95
|
KINGDOM Builders Limited,House No. 470,Road-31, DOHS, Mohakhali, Dhaka-1206.
|
2178.24
|
08/12/2021
|
15/12/2021
|
14/06/2024
|
39
|
558.28
|
21
|
04/08/2024
|
|
14
|
CIB-Nar-W-41
|
"Construction of 625.35m Long Bridge Over Balu River On Demra- Kamshire Road On Keodhala -Kayetpara Nadirghat Road at Chainage 290m Under Rupganj Upazila, District: Narayanganj.
[ Road ID: 367685042] CIB-Nar-W-41 "
|
CIBRR
|
rupganj
|
367685042
|
|
625.35
|
|
9763.72
|
SEL-KBL-UCC JV
|
9763.72
|
22/04/2024
|
29/04/2024
|
28/04/2027
|
0
|
|
|
04/08/2024
|
|
15
|
CIB-Nar-W-35(b)
|
"(b) Const. of 250m Vaiduct of 320m long PSC Girder Bridge over the river Balu at Ch. 00.00m on Porshi G.C-Rupganj-Kayetpara -Demra RHD road at Isapura Part under Rupganj Upazila, District: Narayanganj.
[Road ID: 367682001] CIB-Nar-W-35(b)"
|
CIBRR
|
rupganj
|
367682001
|
|
|
0
|
9763.72
|
|
0.00
|
|
|
|
0
|
0.00
|
0
|
05/10/2023
|
|
16
|
CRDP-II/LGED/NARAYANGANJ/ARAIHAZAR/NCB/2018/W-01
|
Road ID # 367024082: Improvement of Road from Binaichar-Kamrangir Char Road. (ch.0-3434m) , Road ID # 367024082: Construction of 15.00m Long RCC Girder Bridge at ch:0+689m on Binaichar-Kamrangir Char Road. , Road ID # 367024083: Improvement of Road from Fakirbari-Kamrangir char-Majerchar Gopindir School Road. (ch.0-4077m) ; Road ID # 367024083: Construction of 3.0m x 2.50m RCC Box Culvert at ch.0+774m on Fakirbari-Kamrangirchar-Majerchar Gopindir School Road. ; Road ID # 367024083: Construction of 4.50m x 4.50m RCC Box Culvert at ch.1+067m on Fakirbari-Kamrangirchar-Majerchar Gopindir School Road. ; Road ID # 367024083: Construction of 4.00m x 4.00m RCC Box Culvert at ch.2+499m on Fakirbari-Kamrangirchar-Majerchar Gopindir School Road. ; Road ID # 367024083: Construction of RCC Box drain along the Fakirbari-Kamrangirchar Majerchar Gopindir School Road. (ch.0-260m) & (ch.2250-2350m) ; Road ID # 367024083: Improvement of Road from Bagbari-Nowagoan Road . (ch.0+00-4+245m) (Road ID-4080); Road ID # 367024080: Construction of RCC Box drain along the Bagbari-Nowagoan Road. (Length=470m) , Road ID # 367024004: Improvement of Road from Mukandi-Araihazar Narsinghdi R&H Road.(ch.0+00-1+500m) & Link-01 (ch.0+00-0+300m) ; Road ID # 367024004: Construction of 3 nos 1.00m x 1.200m RCC Cross Drain at ch. 1+094m, ch.1+396m & ch.0+138m Link-01 on Mukundi-Araihazar Road. ; Improvement of road from Government Safar Ali Collage - Araihazar Upazila Porishod - RHD via Mohila Collage (Ch.0-1000m) (Road ID # 367024095) including 799m link road ;
|
CRDP-2
|
araihazar
|
367024082, 367024083, 3670240004
|
13.66
|
29.50
|
0
|
2412.37
|
MEC Engineers & Construction Ltd.
|
2361.02
|
15/09/2019
|
29/09/2019
|
05/02/2021
|
20
|
486.10
|
0
|
30/06/2020
|
|
17
|
CRDP-II/LGED/NARAYANGANJ/ARAIHAZAR/NCB/2018/W-02
|
Improvement of road from Government Safar Ali Collage - Araihazar Upazila Porishod - RHD via Mohila Collage (Ch.0-1000m) (Road ID # 367024095) including 799m link road ; Construction of 4.00m x 4.00m Box Culvert at Ch. 660m on Government Safar Ali Collage - Araihazar Upazila Porishod-RHD via Mohela Collage (Road ID # 367024095); Construction of RCC drain along the Government Safar Ali Collage - Araihazar Upazila Porishod-RHD via Mohela Collage (Ch.0-900m) (Road ID # 367024095); Improvement of RHD Araihazar bazar - Araihazar Purinda road (Ch.0-1126m) (Road ID # 367024094) including 517m link road; Construction of RCC drain along the RHD Araihazar bazar - Araihazar Purinda road (Ch.0-576m) (Road ID # 367024094); Construction of RCC drain along the Araihazar Gol Chakkor Box Culvert to Dakkhin Para Steel Bridge road (Ch.0-1000m) including 315m link drain; Improvement of Laskardi - Langardi Bazar road (Ch.0-2200m) (Road ID # 367024072); Construction of 5.00m x 5.00m Box Culvert at Ch.1430m on Laskardi - Langardi Bazar road (Road ID # 367024072); Improvement of Kalibari bazar - Panchrukhy road (Ch.0-3520m) (Road ID # 367024081); Construction of railing and wheel guard of 2 x 4.60m x 4.60m Box Culvert at Ch.1295m on Kalibari bazar - Panchrukhy road (Road ID # 367024081); Construction of railing and wheel guard of 3 x 4.50m x 4.50m Box Culvert at Ch.2870m on Kalibari bazar - Panchrukhy road (Road ID # 367024081); Improvement of Dhuptara - Buntim Pullah road (Ch. 0 - 3007m) (Road ID # 367024077); Construction of 4.50m x 4.50m Box Culvert at Ch.1856m on Dhuptara - Buntim Pullah road (Road ID # 367024077); Construction of 2x 5.00m x 5.00m Box Culvert at Ch.2630m on Dhuptara - Buntim Pullah road (Road ID # 367024077); Construction of RCC drain from Araihazar Bazar Krisnochura to Dakkhin Para Oucha Bridge road (Ch.0-900m ) (Road ID # 367024077);
|
CRDP-2
|
araihazar
|
367024095, 367024094, 367024072, 367024081, 367024077
|
12.17
|
46.20
|
0
|
4139.85
|
JV of NCEL-PDL
|
3965.11
|
27/10/2019
|
10/11/2019
|
24/03/2021
|
12
|
603.16
|
0
|
30/06/2020
|
|
18
|
CRDP-II/LGED/NARAYANGANJ/RUPGANJ/NCB/2018/W-02
|
Improvement of Kanchan GC - Sornakhali bazar - Chanpara RHD road (Ch.0-7300m) (Road ID # 367682003), Widening of RCC Box Culvert (4.50m x 4.50m) at Ch. 836m on Kanchan GC - Sornakhali bazar - Chanpara RHD road (Road ID # 367682003). Widening of RCC Box Culvert (3.50m x 3.50m) at Ch. 2593m on Kanchan GC - Sornakhali bazar - Chanpara RHD road (Road ID # 367682003).; Construction of RCC Box Culvert (3.50m x 3.50m) at Ch. 3765m on Kanchan GC - Sornakhali bazar - Chanpara RHD road (Road ID # 367682003).; Construction of RCC Box Culvert (5.0m x 5.0m) at Ch. 6133m on Kanchan GC - Sornakhali bazar - Chanpara RHD road (Road ID # 367682003).; Construction of RCC Box Culvert (4.50m x 4.50m) at Ch. 6625m on Kanchan GC - Sornakhali bazar - Chanpara RHD road (Road ID # 367682003).; Construction of 45m long RCC girder bridge at Ch. 4855m on Kanchan GC - Sornakhali bazar - Chanpara RHD road (Road ID # 367682003).; Improvement of Kanchan GC - Atlapur bazar - Danga RHD road (Ch.5594-10200m) (Road ID # 367682004) including 80m link road.; Construction of 8 nos. cross drain (0.625m x 0.600m) on Kanchan GC - Atlapur bazar - Danga RHD road (Road ID # 367682004).; Construction of RCC drain along the Kanchan GC - Atlapur bazar - Danga RHD road (Ch.6900-7775m and Ch.9700-10250m) (Road ID # 367682004).; Improvement of Sornokhali bazar - Bolabo UP road (Ch.0-3900m) (Road ID # 367683003).;
|
CRDP-2
|
rupganj
|
367682003, 367682004, 367683003,
|
15.89
|
72.00
|
12
|
5784.08
|
JV of NCEL-PDL
|
5477.66
|
27/10/2019
|
|
22/03/2021
|
6
|
659.27
|
12
|
30/06/2020
|
|
19
|
CRDP-II/LGED/NARAYANGANJ/RUPGANJ/NCB/2018/W-03
|
Improvement of Rupshi-Kanchon GC to Dagarkhal via Karnogoup, Gondrabpur Road (Ch.0-3320m) (Road ID # 367684002), Improvement of Tarabo GC - Rupshi Bazar (Ch.0-2960m) (Road ID # 367683010), Improvement of Borpa RHD - Mohajampur UP Road (Ch.0-5020m) (Road ID # 367682010), Improvement of Murapara GC - Mohishvita - RHD Road (Ch.0-4780m) (Road ID # 367682007) including 2685m Link Roads., Construction of RCC Box Culvert (3.50m x 3.50m) at Ch. 1361m on Murapara GC - Mohishvita - RHD Road (Road ID # 367682007). Construction of 1000mm dia pipe culvert (2 nos.) at Ch.2755m & Ch. 2810m on Murapara GC - Mohishvita - RHD Road (Road ID # 367682007)
|
CRDP-2
|
rupganj
|
367684002, 367683010, 367682010, 367682007,
|
18.77
|
5.50
|
10
|
4010.39
|
JV of NCEL-PDL
|
3970.05
|
22/01/2020
|
|
|
0
|
397.00
|
10
|
30/06/2020
|
|
20
|
CRMIDP/NYNG/W-340
|
Langolbondho Bazar
|
CRMIDP
|
bandar
|
|
|
|
64
|
293.00
|
"M/S S.R Enterprise 69/2, North Chasara Narayanganj "
|
292.99
|
03/07/2022
|
|
30/05/2022
|
95
|
188.49
|
64
|
27/07/2022
|
|
21
|
CRMIDP/NYNG/W-337
|
Fotulla Bazar
|
CRMIDP
|
narayanganj-s
|
|
|
|
18
|
169.00
|
M/S Corporation
|
169.00
|
14/07/2022
|
|
01/08/2022
|
65
|
30.15
|
18
|
27/07/2022
|
|
22
|
GDP-3/NA-94
|
Improvement of Dasherdia Batala-H/O Ismail Hazi Road from Ch.960m-1715m (Road ID No. 367024070) under Upazila: Araihazar, District: Narayanganj.
|
GDP-3
|
araihazar
|
|
0.76
|
|
|
111.57
|
M/S Sajid Enterprise
|
111.55
|
04/04/2022
|
|
|
20
|
|
|
06/02/2024
|
|
23
|
GDP-3/ NA-82
|
Improvement of Doyakanda Barak Mia house-Amir Uddin Chowkedar House Road By BC at Ch. 00-600m under Upazila: Araihazar, District: Narayanganj Road ID No. 367025304
Salvage Cost Tk. 36,772.00
Package no: GDP-3/ NA-82
|
GDP-3
|
araihazar
|
|
0.60
|
|
|
47.98
|
M/S MUHAMMADITRADERS
|
47.91
|
|
|
|
100
|
|
|
23/05/2023
|
|
24
|
GDP-3/NA-78
|
Improvement of Rail Line (Araihazar-Madonpur) Pacca Road to Fawsha Pacca Road by BC at Ch. 0.00-935.00m under Upazila: Araihazar District: Narayanganj Road ID No. 367025359
Salvage Cost Tk. 17,24,318.00
Package no: GDP-3/NA-78
|
GDP-3
|
araihazar
|
|
0.94
|
|
|
87.35
|
GDP-3/NA-78
|
82.98
|
|
|
|
100
|
|
|
29/01/2023
|
|
25
|
GDP-3/ NA-81
|
Improvement of Bogadi Kand Para raham Ali Member House to Noapara Chairman House Via Kandapara Atim Khana Via Bogadi Samajkallan Road By BC at Ch. 1412-2250m under Upazila: Araihazar, District: Narayanganj Road ID No. 367025279
Salvage Cost Tk. 15,19,847.00
Package no: GDP-3/ NA-81
|
GDP-3
|
araihazar
|
|
0.84
|
|
|
73.50
|
M/S FOYSAL TRADERS
|
73.50
|
|
|
|
100
|
|
|
26/07/2022
|
|
26
|
GDP-3/NA-79
|
Improvement of Pachgaon Noyapara Pacca Road- Kahunda Graveyard Road by RCC at Ch. 0.00-624.00m under Upazila: Araihazar District: Narayanganj Road ID No. 367025368
Package no: GDP-3/NA-79
|
GDP-3
|
araihazar
|
|
0.62
|
|
|
111.84
|
M/S Aliza Amin Construction,
|
106.24
|
28/02/2022
|
|
01/05/2023
|
100
|
|
|
28/06/2022
|
|
27
|
Package no: GDP-3/NA-66
|
a) Improvement of Kalibari Panchrukhi road at Ragobdi Bridge to Singrati Jumma Maszid road by BC at Ch. 00-930m under Upazila: Araihazar District: Narayanganj Road ID No. 367025355
Salvage Cost. 9,78,880.00
b) Improvement of Karaitala baily Bridge to Karaitala Sultan Repotar’s House road by BC at Ch. 00-230m under Upazila: Araihazar District: Narayanganj Road ID No. 367025293
Package no: GDP-3/NA-66
|
GDP-3
|
araihazar
|
|
1.16
|
|
|
104.63
|
M/S Masum Builders, Prop: Serajul Islam Bhuiyan, Araihazar, Narayanganj
|
99.40
|
|
|
|
100
|
98.76
|
|
19/06/2022
|
|
28
|
GDP-3/NA-56
|
1. Improvement of Dokkhinpara Nasir Dr. House to Dokkhinpara Govt. Primary School Road by BC at Ch. 00-421m under Upazila: Araihazar District: Narayanganj Road ID No. 367025217
2. Improvement of Doyakanda to Shomvupura Road by BC at Ch. 00-532m under Upazila: Araihazar District: Narayanganj Road ID No. 367025233
3. Improvement of Dasherdia (Pacca Road) to Madhobdi Ghat (Dasherdia Elies House- Field) Road by BC at Ch. 00-468m under Upazila: Araihazar District: Narayanganj Road ID No. 367025075
Package no: GDP-3/NA-56
|
GDP-3
|
araihazar
|
|
1.42
|
|
|
142.90
|
M/S Islam & Brothers, Prop: Shafiqul Islam, Baronagar, Sonargaon, Narayanganj.
|
135.76
|
|
|
|
100
|
|
|
06/10/2021
|
|
29
|
GDP-3/NA-64
|
Improvement of Tateya Hanif Doctor House-Primary School Road from Ch. 570-970m under Upazila: Araihazar District: Narayanganj Road ID No. 367025160
Package no: GDP-3/NA-64
|
GDP-3
|
araihazar
|
|
0.40
|
|
|
33.08
|
B.A.K Construction,
|
28.77
|
|
|
|
100
|
18.81
|
|
26/08/2021
|
|
30
|
GDP-3/NA-65
|
Improvement of Tateya Hanif Doctor House-Primary School Road from Ch. 970-1365m under Upazila: Araihazar District: Narayanganj Road ID No. 367025160.
Package no: GDP-3/NA-65
|
GDP-3
|
araihazar
|
|
0.40
|
|
|
32.66
|
B.A.K Construction,
|
28.29
|
|
|
|
100
|
15.65
|
|
26/08/2021
|
|
31
|
GDP-3/NA-42
|
1. a) Improvement of Bagbari Noagaon Road (Dakkhin Para Mosque) – In front of Tara Miah House Road at Ch: 00-404m under Araihazar Upazila, District: Narayanganj. Road ID No: 367025375.
b) Improvement of Dhaka Sylhet RHD Near of Panchrukhi GPS to Shalek Haji House Road at Ch: 00m-182m under Araihazar Upazila District: Narayanganj. Road ID No: 367025365.
c) Improvement of Dhaka Sylhet RHD – Khanpara Mosque via Shiraj Molla House Road at Ch: 00m-300m under Araihazar Upazila District: Narayanganj. Road ID No: 367025366.
d) Improvement of Dhaka Shibpur Main Road to Noapara Culvert via Graveyard Road at Ch: 00m-530m under Araihazar Upazila, District: Narayanganj. Road ID No: 367025289.
e) Improvement of Khanpara H/O Khalil Bhayan to Mukter Khan house via Khanpara Graveyard Road at Ch: 00m-490m under Araihazar Upazila, District: Narayanganj. Road ID No: 367025352.
f) Improvement of Kalibari Panchrukhi road pond of Munsurali- via Moszid to Ambor ali house Road at Ch: 00m-167m under Araihazar Upazila, District: Narayanganj. Road ID No: 367025353.
g) Improvement of Baro Mollarchar Pukur Par Mosjid - Rail line (Mollerchor Bazar) via Eid Gha Road at Ch: 00m-590m under Araihazar Upazila, District: Narayanganj. Road ID No: 367025370
Package no: GDP-3/NA-42
|
GDP-3
|
araihazar
|
|
2.66
|
|
|
189.83
|
M/S S. S. Corporation, Araihazar, Narayanganj
|
189.67
|
|
|
|
100
|
|
|
03/02/2021
|
|
32
|
GDP-3/ NA-19
|
a) Improvement of Pachgaon Mollapara (Araihazar- Purinda Pacca Road)- Khodai Bari Mosque via Mollapara Madrasha Road at Ch. 0+om-0+425m.( ID No.367025369), b) Improvement of Tateya Hanif Doctor House-Primary School Road from Ch. 00m-570m.( Id No. 3670251
|
GDP-3
|
araihazar
|
|
2.50
|
|
|
151.29
|
M/S Masum Builders
|
151.28
|
|
05/11/2018
|
04/07/2019
|
100
|
|
|
03/06/2020
|
|
33
|
GDP-3/ NA-22
|
a) Improvement of Brammandi Union Parishad to Digoldi Pacca road via Mohila Madrash Road from Ch.00m-501m Under Araihazar Upazila, District: Narayanganj (ID No: 367025364), b) Improvement of Khagkanda Kadamtalir Katakhalir Bridge- Lalurkandi GPS Road from
|
GDP-3
|
araihazar
|
|
1.47
|
|
|
142.10
|
M/S Masum traders
|
142.10
|
|
|
|
100
|
|
|
03/06/2020
|
|
34
|
GDP-3/ NA-25
|
a) Improvement of Salomdi Pucca Road to Primary School Road from Ch. 800m-1260m Under Araihazar Upazila, District: Narayanganj (ID No: 367025145), b) Improvement of Afordi More- Shonghodi Kanda Near H/O Soad Ali Road from Ch. 00m-1072m Under Araihazar Up
|
GDP-3
|
araihazar
|
|
2.18
|
|
|
190.43
|
M/S Masum Builders
|
190.42
|
|
|
|
100
|
|
|
03/06/2020
|
|
35
|
GDP-3/ NA-23
|
a) Improvement of Rohmat Ali Mill to Pucc Road Near Waj Uddin via Muktizudda Sukkur Ali House (Panchrukhi Dakhin Molla Para Raham Ali Pradhan Mill to Pucca Road near the House of Waj Uddin Khan via H/O Emamuddin Member Road )Road from Ch.00m-510m Under A
|
GDP-3
|
araihazar
|
|
1.48
|
|
|
91.60
|
M/S Nazmul Enterprise
|
91.60
|
|
|
|
100
|
|
|
05/12/2019
|
|
36
|
GDP-3/ NA-24
|
a) Improvement of Kollandi Mullah Para - Gangkul Para via Mahabub House Road from Ch.00m-288m Under Araihazar Upazila, District: Narayanganj (ID No: 367025203), b) Improvement of Baliapara Provakardi Road- Tofazzal Hossain Master House Road from Ch.00m-20
|
GDP-3
|
araihazar
|
|
1.63
|
|
|
123.17
|
M/S S.S Corporation
|
123.17
|
|
|
|
100
|
|
|
06/08/2019
|
|
37
|
GDP-3/NA-104
|
Improvement of Kushira Puran Bandar Connecting Road Giash Uddin miah house to Abil mia house Road by BC at Ch. 00-450mm Road (ID-367065157) under Upazila: Bandar, District: Narayanganj.
|
GDP-3
|
bandar
|
367065157
|
0.45
|
|
|
53.30
|
M/S Sarkar Enterprise
|
53.63
|
08/05/2022
|
|
|
72
|
|
|
01/07/2024
|
|
38
|
GDP-3/ NA-70
|
Improvement of Rustampur-Mir Kundi Road by RCC at Ch. 360m-2230m under Upazila: Bandar District: Narayanganj Road ID No. 367064036
Salvage Cost Tk. 3,14,689.00
Package no: GDP-3/ NA-70
|
GDP-3
|
bandar
|
|
1.87
|
|
|
338.56
|
M/S Mominul Hoque and M/S SIAM CORPORATION JV
|
307.80
|
|
|
|
100
|
|
|
03/03/2024
|
|
39
|
GDP-3/NA-54
|
Constuction of 18.00m Long RCC Girder Bridge on Malibag High School to Baligaon Road at Ch 20m under Upazila : Bandar, District: Narayanganj Road ID No. 367064014
Package no: GDP-3/NA-54
|
GDP-3
|
bandar
|
|
|
18.00
|
|
149.95
|
Orient Trade International, 17/18, Akhoy Das Lane, Gandaria, Sutrapur, Dhaka-1204
|
179.92
|
25/07/2022
|
31/07/2022
|
31/01/2024
|
100
|
|
|
04/09/2023
|
|
40
|
GDP-3/ NA-47
|
1. a) Improvement of Kamtal Madrasha-Brahammaputra river via H/O Sokina Member Road at Ch. 00-605m under Upazila: Bandar District: Narayanganj Road ID No. 36706407. Salvage Cost: 63,552.00
b) Improvement of Madanpur Madanganj R&H- Ananda Nagar Road at Ch. 00-635m under Upazila: Bandar District: Narayanganj Road ID No. 367065048. Salvage Cost: 3,46,718.00
c) Improvement of Jangul-Kumrabo Road at Ch. 00-500m under Upazila: Bandar District: Narayanganj Road ID No. 367064049
Package no: GDP-3/ NA-47
|
GDP-3
|
bandar
|
|
1.74
|
|
|
157.16
|
M/S Asif & Brothers,
|
157.12
|
|
|
|
100
|
53.43
|
|
01/08/2023
|
|
41
|
GDP-3/NA-87
|
Constuction of 2x5.00m x 3.00m RCC Box Culvert on Kushiara-Dashergaon R&H Road at Ch 5.00m under Upazila : Bandar, District: Narayanganj Road ID No. 367064027
Package no: GDP-3/NA-87
|
GDP-3
|
bandar
|
|
|
10.00
|
|
54.45
|
M/S Hazi Yunus Enterprise,
|
51.73
|
19/05/2022
|
25/05/2022
|
24/05/2023
|
100
|
|
|
01/08/2023
|
|
42
|
GDP-3/NA-53
|
Construction of 15.00m Long RCC Girder bridge on Jungle-Kandapara Hazradi Road at ch.700m under Upazila: Bandar District: Narayanganj Road ID No. 367064007
Package no: GDP-3/NA-53
|
GDP-3
|
bandar
|
|
|
15.00
|
|
124.95
|
M/S Zihad Enterprise, Prop: Md. Zakir Hossain, Farazikanda, Modanganj, Bandar, Naraynganj.
|
124.95
|
|
|
|
100
|
98.52
|
|
05/07/2023
|
|
43
|
GDP-3/NA-57
|
a. Improvement of Adampur Bridge-Alauddin(Akiluddin) bari Road by BC at Ch. 00-375m under Upazila: Bandar District: Narayanganj Road ID No. 367065147.
b.Improvement of Zeodhara-(Shelsardi)- Digaldi Primary School Road by BC at Ch. 00-510m. under Upazila: Bandar District: Narayanganj Road ID No. 367065020. Salvage Cost Tk. 45,798.00
Package no: GDP-3/NA-57
|
GDP-3
|
bandar
|
|
0.89
|
|
|
92.27
|
M/S Kazi Enterprise, Prop: Kazi Masud, Golnagar, Olipura bazar, Sonargaon, Narayanganj
|
87.66
|
|
|
|
60
|
|
|
30/03/2023
|
|
44
|
GDP-3/NA-58
|
Improvement of Salserdi GPS-Sabdi bazar main Road by BC at Ch. 00-675m under Upazila: Bandar District: Narayanganj Road ID No.367065108 (367065107). Salvage Cost Tk. 1,73,644.00
Package no: GDP-3/NA-58
|
GDP-3
|
bandar
|
|
0.68
|
|
|
65.68
|
M/S Kazi Enterprise, Prop: Kazi Masud, Golnagar, Olipura bazar, Sonargaon, Narayanganj.
|
62.39
|
|
|
|
100
|
|
|
05/12/2022
|
|
45
|
GDP-3/NA-67
|
Improvement of UZ H/Q-Sabdi Bazar Road (Kollandi Bazar RHD –Sathi Bazar) By RCC at Ch. 1257-2000m under Upazila: Bandar, District: Narayanganj Road ID No. 367062004.
Salvage Cost Tk. 1,07,209.00
Package no: GDP-3/NA-67
|
GDP-3
|
bandar
|
|
0.74
|
|
|
189.87
|
Aristocratic Construction Firm, Mouchak, Sanarpar, Siddirganj, Narayanganj
|
206.00
|
28/06/2022
|
05/07/2022
|
02/01/2024
|
100
|
8.00
|
|
04/10/2022
|
|
46
|
GDP-3/NA-55
|
Construction of 28.00m Long RCC Girder bridge on Chanpur Bigghan parished-Kalabag Road at ch.400m under Upazila: Bandar District: Narayanganj Road ID No. 367065038
Package no: GDP-3/NA-55
|
GDP-3
|
bandar
|
|
|
28.00
|
|
165.47
|
Nannu-Hasib JV, Bagori, Sonargaon, Narayanganj.
|
165.37
|
|
|
|
100
|
|
|
29/08/2022
|
|
47
|
GDP-3/ NA-40
|
1.a) Improvement of Adampur Pagla bari- Kallayandi Main Road from Ch: 00m-805.00m under Bandar Upazila District: Narayanganj. Road ID No: 367065146. Salvage Cost: 1,30,370.00
b)Improvement of Kandipara pacca Bridge -Hazradi Road from Ch: 600.00m-1150.00m under Bandar Upazila District: Narayanganj. Road ID No: 367064028. Salvage Cost: 2,09,736.00
c) Improvement of Hazi Saleque Bridge – Mohanpur Graveyard Road from Ch: 00m-300.00m under Bandar Upazila District: Narayanganj. Road ID No: 367065031.
d)Improvement of Burandhi Moslauddin Memberbari-Kuria vita via Narpadi Road from Ch: 00.00m-550.00m under Bandar Upazila District: Narayanganj. Road ID No: 367065144. Salvage Cost: 1,60,536.00
e) Improvement of Burandhi Nurul Huda bari- Kandhipar Narpadi via Uttarpara Mosque Road form Ch: 00m-734.00m under Bandar Upazila District: Narayanganj. Road ID No: 367065143. Salvage Cost: 9,04,485.00
f) Improvement of Lausher H/O Sukkur Ali-Lausher Registered Primari School Road form Ch: 00.00m-318.00m under Bandar Upazila District: Narayanganj. Road ID No: 367065074. Salvage Cost: 1,33,453.00
g) Improvement of Madanpur Madrasha - Dewanbag H/O Shoban Mia Road form Ch: 00m-335.00m under Bandar Upazila District: Narayanganj. Road ID No: 367065036.
Package no: GDP-3/ NA-40
|
GDP-3
|
bandar
|
|
3.59
|
|
|
335.92
|
M/S Ahsan Enterprise,
|
351.18
|
|
|
|
100
|
303.56
|
|
19/06/2022
|
|
48
|
GDP-3/NA-60
|
Improvement of Kuripara Bat Tala to Amior Bat Tala Road by BC at Ch. 00-500m under Upazila: Bandar District: Narayanganj Road ID No. 367065103. Salvage Cost Tk. 1,37,441.00
Package no: GDP-3/NA-60
|
GDP-3
|
bandar
|
|
0.50
|
|
|
51.67
|
M/S Kazi Enterprise, Prop: Kazi Masud, Golnagar, Olipura bazar, Sonargaon, Narayanganj.
|
49.09
|
|
|
|
100
|
|
|
01/06/2021
|
|
49
|
GDP-3/NA-46
|
1. a) Improvement of Kushiara – Dashergaon R&H Road at Ch. 00-660m under Upazila: Bandar District: Narayanganj Road ID No. 367064027.
b) Improvement of Madanpur R&H-Changain Road at Ch. 00-262m under Upazila: Bandar District: Narayanganj Road ID No. 367064012. Salvage Cost Tk. 47,167.00
Package no: GDP-3/NA-46
|
GDP-3
|
bandar
|
|
0.92
|
|
|
92.28
|
M/S Prodhan Construction, Prop: Abul Hasnat Sohan, 2 No. Madhabpasa, Madanganj, Bandar, Naraynganj.
|
92.28
|
|
|
|
100
|
|
|
11/04/2021
|
|
50
|
GDP-3/NA-48
|
2. Improvement of Padugar-Kulcharitra Road at Ch. 00-760m under Upazila: Bandar District: Narayanganj Road ID No. 367064015.
Salvage Cost Tk. 3,91,631.00
Package no: GDP-3/NA-48
|
GDP-3
|
bandar
|
|
0.76
|
|
|
73.67
|
M/S Prodhan Construction
|
73.67
|
|
|
|
100
|
|
|
03/03/2021
|
|
51
|
GDP-3/ NA-13
|
a) Improvement of Musapur RHD Pacca Road - H/O Ataulla Via Musapur Primary School Road from Ch.00m-730m (ID No.367065065), b) Improvement of Jungal to Kandapara Road from Ch. 1350m-1950m. ( ID No. 367064007), c) Improvement of Bandar Shahi Mosque-Kalaba
|
GDP-3
|
bandar
|
|
2.36
|
|
|
233.47
|
M/S Ahasan Enterprise
|
233.47
|
|
|
|
100
|
|
|
10/08/2020
|
|
52
|
GDP-3/ NA-14
|
a)Improvement of Aaistala Kalabag Bridge - Uttar Sabdhi Main Road from Ch. 00m-636m (ID No.367065106), b) Improvement of Lousher Road-kainal vita Graveyeard Road from Ch. 00m-1330m, Construction of Double Vent (2x900mm) Pipe Culvert on Lousher road-kainal
|
GDP-3
|
bandar
|
|
2.66
|
|
|
248.04
|
M/S Ahasan Enterprise
|
248.04
|
|
|
|
100
|
|
|
03/06/2020
|
|
53
|
GDP-3/NA-99
|
Improvement of Bhuighar Canalpar Pucca Road to Adrosha Nagar Chowrasta Road from Ch. 00m-810m & Connecting 110m by RCC (Road ID-367585427) under Upazila: Sadar, District: Narayanganj.
|
GDP-3
|
narayanganj-s
|
|
0.81
|
8.00
|
|
262.43
|
M/S Akbar Construction
|
146.26
|
06/03/2022
|
|
|
65
|
|
|
02/09/2024
|
|
54
|
Package no: GDP-3/NA-93
|
Improvement of House of Ismail Bhuyan Paper Mill up to DN link Road by RCC by Ch. 0.00m-665.00m (Road ID No. 367584023) under Upazila: Sadar, District: Narayanganj).
Package no: GDP-3/NA-93
|
GDP-3
|
narayanganj-s
|
|
0.67
|
|
|
126.92
|
M/S A. N. Corporation
|
133.25
|
|
|
|
75
|
|
|
02/09/2024
|
|
55
|
Package no: GDP-3/NA-91
|
Improvement of Adarsha Nagar to Dalutpur join Road by RCC at Ch. 0.00m-517.00m (Road ID No. 367585052) under Upazila: Sadar, District: Narayanganj.
Package no: GDP-3/NA-91
|
GDP-3
|
narayanganj-s
|
|
0.52
|
|
|
101.77
|
M/S S Haque Construction
|
106.85
|
|
|
|
100
|
|
|
03/03/2024
|
|
56
|
GDP-3/NA-89
|
Improvement of 3 No. Nur Mosque to azmiribug (Fatullah) Road by RCC at Ch. 0.00m-335.00m (Road ID No. 367585402) [Salvage cost Tk. 7,66,437.00] under Upazila: Sadar, District: Narayanganj.
Package no: GDP-3/NA-89
|
GDP-3
|
narayanganj-s
|
|
0.34
|
|
|
76.51
|
M/S Atif Enterprise
|
80.26
|
18/04/2023
|
25/04/2023
|
|
100
|
|
|
03/03/2024
|
|
57
|
Package no: GDP-3/NA-90
|
Improvement of koraitola Bus stand-H/O Rahmat Road by RCC at Ch. 0.00m-620.00m (Road ID No. 367585222) under Upazila: Sadar, District: Narayanganj.
Package no: GDP-3/NA-90
|
GDP-3
|
narayanganj-s
|
|
0.62
|
|
|
127.18
|
AEIMCO INTERNATIONAL
|
132.91
|
04/10/2023
|
|
|
100
|
|
|
04/09/2023
|
|
58
|
Package no: GDP-3/NA-92
|
Improvement of kutubpur union Santidhara link road to Anwar member house Road by RCC at Ch. 0.00m-375.00m (Road ID No. 367585319) under Upazila: Sadar, District: Narayanganj.
Package no: GDP-3/NA-92
|
GDP-3
|
narayanganj-s
|
|
0.38
|
|
|
71.26
|
S.A. Trade & Syndicate
|
74.83
|
|
|
|
100
|
|
|
04/09/2023
|
|
59
|
GDP-3/NA-77
|
Improvement of Kutubpur west Rasulpur Railline- Alakchan BB Madrasha Road by RCC at Ch. 0.00-600.00m under Upazila: Sadar District: Narayanganj Road ID No. 367585206
Package no: GDP-3/NA-77
|
GDP-3
|
narayanganj-s
|
|
0.60
|
|
|
110.17
|
M/S S Haque Construction
|
110.17
|
|
|
|
100
|
30.00
|
|
04/10/2022
|
|
60
|
GDP-3/NA-75
|
Improvement of Kutubpur union Santidhara link road to Anwar Member house Road by RCC at Ch. 0.00-375.00m under Upazila: Sadar District: Narayanganj Road ID No. 367585319
Package no: GDP-3/NA-75
|
GDP-3
|
narayanganj-s
|
|
0.38
|
|
|
66.40
|
M/S Real Enterprise
|
63.08
|
|
|
|
0
|
|
|
19/06/2022
|
|
61
|
GDP-3/NA-76
|
Improvement of House of Ismail Bhuyan Paper Mill up to DN link Road by RCC at Ch. 0.00-665.00m under Upazila: Sadar District: Narayanganj Road ID No. 367584023
Package no: GDP-3/NA-76
|
GDP-3
|
narayanganj-s
|
|
0.67
|
|
|
121.23
|
M/S Real Enterprise
|
115.16
|
|
|
|
0
|
|
|
19/06/2022
|
|
62
|
GDP-3/ NA-29
|
4.a) Improvement of Pagla Moddha Rasulpur A.K.M. Shamshujjoha Road from Ch. 000m-1000m by RCC ( Road ID No.367585465),
b) Improvement of Panchobati Koloni to Shah Fateullah Railgate Road from Ch. 000m-253m ( Road ID No.367585472),
c) Improvement of Gog
|
GDP-3
|
narayanganj-s
|
|
2.17
|
|
|
251.75
|
M/S Ahasan Enterprise
|
251.75
|
|
|
|
100
|
|
|
01/06/2021
|
|
63
|
GDP-3/ NA-11
|
a) Improvement of Talla D Capital Print-Noborobi Clab Road at Ch. 000-455m (Road ID 367585084), b) Improvement of Fatullah RHD-Rail Crossing-Jalkuri RHD Road at Ch. 2475-3420m by RCC (Road ID 367584096) under Upazila: Sadar, District: Narayanganj.
|
GDP-3
|
narayanganj-s
|
|
1.40
|
|
|
149.52
|
M/S A. N. Corporation
|
149.51
|
|
10/10/2018
|
09/04/2019
|
100
|
|
|
03/12/2020
|
|
64
|
GDP-3/ NA-27
|
2.a) Improvement of Kayempur Old Jamme Mosque to Pitali Pool Road from Ch. 000m-290m ( Road ID No.367585475),
b) Improvement of Kayempur WAPDA Pool- Kutubpur Club to Kutubpur Pry. School Road from Ch. 000m-365m ( Road ID No.367585477),
c) Improvement of
|
GDP-3
|
narayanganj-s
|
|
1.66
|
|
|
128.82
|
M/S Akbar Construction
|
128.82
|
|
|
|
100
|
|
|
03/12/2020
|
|
65
|
GDP-3/ NA-26
|
.a) Improvement of Gosherbug Jamal Garrage to H/O Nazrul Road from Ch.000-580m ( Road ID No.367585469), b)Improvement of Pagla Moddah Rasulpur H/O Motaleb Kha to H/O Majib Kha Road from Ch. 000m-275m ( Road ID No.367585406),
c) Improvement of Mamudpur K
|
GDP-3
|
narayanganj-s
|
|
2.81
|
|
|
193.99
|
M/S Akbar Construction
|
193.99
|
|
|
|
100
|
|
|
04/11/2020
|
|
66
|
GDP-3/ NA-28
|
3.a) Improvement of Enayetnagar UP Office(Panchaboti)-Mazdair Kabarstan bazar Road from Ch.1355-2480m ( Road ID No.367583001),
b) Improvement of Islambag-WAPDA Pool Road from Ch. 000m-355m ( Road ID No.367584075),
c) Improvement of Uttor Gopalnagar River
|
GDP-3
|
narayanganj-s
|
|
2.65
|
|
|
284.45
|
M/S Ripa Construction & M/S Asib Enterprise (JV)
|
284.43
|
|
|
|
100
|
|
|
03/06/2020
|
|
67
|
GDP-3/ NA-30
|
.a) Improvement of Moddhonagar Rajnagar H/O Sattar Mia to Bhandari Char Moddhonagar Road from Ch. 000m-670m ( Road ID No.367585449),
b) Improvement of Pagla Rail line Side to Dhaka Munshiganj Road from Ch. 000m-810m ( Road ID No.367585464),
c) Improvem
|
GDP-3
|
narayanganj-s
|
|
2.07
|
|
|
152.63
|
M/S Akbar Construction
|
152.63
|
|
|
|
100
|
|
|
10/02/2020
|
|
68
|
GDP-3/ NA-21
|
a) Improvement of Dharmaganj Kheyaghat to Maddhya Naga Road from Ch.1000-1569m Under Sadar Upazila, District: Narayanganj (ID No: 367584033), b) Improvement of Abdul Samad Hazi Khamar - Mahmudpur Karim Market Road from Ch. 00m-685m Under Sadar Upazila, Di
|
GDP-3
|
narayanganj-s
|
|
2.50
|
|
|
218.91
|
M/S Ahasan Enterprise
|
205.99
|
|
|
|
100
|
|
|
08/01/2020
|
|
69
|
GDP-3/ NA-16
|
Improvement of Shashongaon R&H-Baktabali GC-Taltola GC Road from Ch.4000m-6000m by RCC. (ID No.367582003)
|
GDP-3
|
narayanganj-s
|
|
20.00
|
|
|
397.46
|
M/S S. R. Enterprise
|
397.44
|
|
|
|
100
|
|
|
05/12/2019
|
|
70
|
GDP-3/ NA-18
|
a) Improvement of Baktaboli UP office - Prashannonagar ( Radanagar)Road from Ch. 1227m-2608m (ID No. 367585095), b)Improvement of Shashongaon Boktaboli GCCR- Laxminagar Madrasha to Moddhanagar Rajnagar Road from Ch. 00m-1100m.(ID No.367585405)
|
GDP-3
|
narayanganj-s
|
|
2.48
|
|
|
183.91
|
M/S S. R. Enterprise
|
183.91
|
|
18/11/2018
|
17/11/2019
|
100
|
|
|
05/11/2019
|
|
71
|
GDP-3/NA-Reh-45
|
Rehabilitation of Nalua – Farazikanda - Paikpara road. at Ch. 00-420m. under Sadar Upazila, Dist.: Narayanganj. Road ID No. 367584083. Salvage Cost Tk. 57,626.00,
Package no: GDP-3/NA-Reh-45
|
GDP-3
|
narayanganj-s
|
|
0.42
|
|
|
69.28
|
M/S A.N Corporation,
|
69.28
|
|
|
|
100
|
|
|
05/11/2019
|
|
72
|
GDP-3/ NA-39
|
2. a) Improvement of Pagla-Noyamati Hazi Amir Ali Road at Ch. 00-470m (Road ID: 367585433) , b) Improvement of Volail bridge to Tower Road at Ch. 00-1150m (Road ID: 367585434), c) Improvement of Masdair Siam Garments-Ponchoboti Colony Road (Dormagonj Khea
|
GDP-3
|
narayanganj-s
|
|
2.17
|
|
|
156.69
|
M/S Akbar Construction Prop: Md. Ali Akbar, 72/2, North Chasara, Narayanganj
|
156.69
|
|
|
|
100
|
|
|
09/10/2019
|
|
73
|
GDP-3/ NA-7
|
Improvement of Masdair DN to R & H Road by RCC from Ch.349m-395m & Ch. 495m-958m (Road ID-367584125), 2)Improvement of Kutubpur Bhuigar Shamshuzzoha Road by RCC from Ch.000m-1025m (Road ID-367584068, 3)Improvement of Bhuighar DN Link Road - Rupayan Housin
|
GDP-3
|
narayanganj-s
|
|
2.99
|
|
|
463.55
|
M/S Ahasan Enterprise
|
463.38
|
|
02/10/2018
|
01/10/2019
|
100
|
|
|
05/10/2019
|
|
74
|
GDP-3/ NA-10
|
Improvement of Kutubpur UP Office (Tatkhana) to Dhaka-Narayanganj link Road via Bhuighar Bus-Stand Bazar Road by RCC at Ch. 000-3710m (Road ID-367583004) under Upazlia: Sadar, District: Narayanganj.
|
GDP-3
|
narayanganj-s
|
|
3.71
|
|
|
905.34
|
M/S Ahasan Enterprise
|
905.21
|
|
02/10/2018
|
01/10/2019
|
100
|
|
|
08/07/2019
|
|
75
|
GDP-3/ NA-12
|
a) Improvement of Mizmizi-Bhuighar-Roughunathpur Road at Ch. 2540-3500m by RCC (Road ID 367584106), b) Improvement of Kaium old Jamme Mosque to New Jailkhana Road at Ch. 575-940m by RCC (Road ID 367584046), c) Improvement of Ragunathpur link Road to Hossa
|
GDP-3
|
narayanganj-s
|
|
1.70
|
|
|
206.51
|
M/S Ahasan Enterprise
|
206.50
|
|
26/11/2018
|
25/11/2019
|
100
|
|
|
08/07/2019
|
|
76
|
GDP-3/ NA-15
|
Improvement of Fatulla post office R&H-Hazigonj R&H Road via Upazila H/Q Road from Ch. 2170m-4260m by RCC.(ID No.367582002)
|
GDP-3
|
narayanganj-s
|
|
2.09
|
|
|
387.55
|
M/S S. R. Enterprise
|
387.47
|
|
20/11/2018
|
19/05/2019
|
100
|
|
|
08/07/2019
|
|
77
|
GDP-3/ NA-17
|
a) Improvement of Isdair bazar Gabtali via Uttar Masdair(Pilkhana) Road from Ch. 00m-660m by RCC (ID No. 367584067), b) Improvement of Hazipara culvert to Gaddar bazar road via Nur Nagar Road from Ch. 00m-1032m by RCC .(ID No.367585412)
|
GDP-3
|
narayanganj-s
|
|
16.92
|
|
|
225.30
|
M/S Akbar Construction
|
225.29
|
|
|
|
100
|
|
|
08/07/2019
|
|
78
|
GDP-3/ NA-38
|
1. a) Improvement of Pilkuni Bhasha Sainik Nagina Joha Road at Ch. 00-805m by RCC (Road ID: 367585473) b) Improvement of Saddam market to Bhuigoar Graveyeard via Delpara Khalpar Road at Ch. 00-1080m by RCC (Road ID: 367585462) , c) Improvement of Dapa Uk
|
GDP-3
|
narayanganj-s
|
|
2.27
|
|
|
349.97
|
M/s Ahsan Enterprise, 60, Shahsuja Road , Paikpara, Narayanganj
|
349.85
|
|
|
|
100
|
|
|
08/07/2019
|
|
79
|
GDP-3/ NA-20
|
Improvement of Baktabali UP Office-DecreercharBazar Road by RCC at Ch. 995-1567m Under Sadar Upazila, District: Narayanganj (ID No: 367583008)
|
GDP-3
|
narayanganj-s
|
|
0.61
|
|
|
73.88
|
M/S S. R. Enterprise
|
73.88
|
18/12/2018
|
|
|
100
|
|
|
09/06/2019
|
|
80
|
GDP-3/ NA-1
|
Improvement of Baburail Bangla bazar to Kashipur UP Office (R&H) Road (Road ID-367583006) from Ch: 00m-1124m by RCC under Upazila: Sadar, District: Narayanganj.
|
GDP-3
|
narayanganj-s
|
|
1.14
|
|
|
136.01
|
M/S A.N Corporation
|
136.01
|
|
14/05/2018
|
13/05/2019
|
100
|
|
|
|
|
81
|
GDP-3/ NA-2
|
Improvement of Delpara Road Bhuighar (Dhaka Narayanganj Link Road) Road from Ch: 00m-1690m by RCC (Road ID-367584058) under Upazila: Sadar, District: Narayanganj.
|
GDP-3
|
narayanganj-s
|
|
1.69
|
|
|
205.77
|
M/S S.R Enterprise
|
205.77
|
|
|
15/05/2019
|
100
|
|
|
|
|
82
|
GDP-3/ NA-3
|
Improvement of Shadu Madbar Road from Ch: 00m-1505m by RCC (Road ID-367584090) under Upazila: Sadar, District: Narayanganj.
|
GDP-3
|
narayanganj-s
|
|
1.50
|
|
|
180.05
|
M/S A.N Corporation
|
180.05
|
|
26/05/2018
|
25/05/2019
|
100
|
|
|
|
|
83
|
GDP-3/ NA-4
|
Improvement of Kutubpur Bhuighar Shamshuzzoha Road from Ch: 00m-1500m by RCC (Road ID-367585443) under Upazila: Sadar, District: Narayanganj.
|
GDP-3
|
narayanganj-s
|
|
1.50
|
|
|
194.25
|
M/S S.R Enterprise
|
194.25
|
|
16/05/2018
|
15/05/2019
|
0
|
|
|
|
|
84
|
GDP-3/ NA-5
|
Improvement of Aligonj to Dhaka-Narayanganj Rail Line Road from Ch: 00m-1000m by RCC (Road ID-367585055) under Upazila: Sadar, District: Narayanganj.
|
GDP-3
|
narayanganj-s
|
|
1.00
|
|
|
121.30
|
M/S A.S.B Enterprise
|
121.30
|
|
26/05/2018
|
25/05/2019
|
100
|
|
|
|
|
85
|
GDP-3/ NA-6
|
Improvement of Bhuighar Canalpar Pucca Road to Adrosha Nagar Chowrasta Road from Ch. 00m-810m by RCC (Road ID-367585427) under Upazila: Sadar, District: Narayanganj.
|
GDP-3
|
narayanganj-s
|
|
0.81
|
|
|
52.58
|
M/S S.R Enterprise
|
52.58
|
|
16/05/2018
|
15/11/2018
|
0
|
|
|
|
|
86
|
GDP-3/NA-100
|
Construction of RCC Drain on Demra Kaligonj Road Liton Member Bari - Jangir Konapara via Kudur Market Road at Ch.00m-515m. (Road ID No. 367685461) under Upazila: Rupganj, District: Narayanganj
|
GDP-3
|
rupganj
|
|
|
515.00
|
|
90.11
|
M/S Samiya Enterprise
|
85.61
|
27/12/2023
|
|
|
100
|
|
|
02/09/2024
|
|
87
|
GDP-3/NA-88
|
Constuction of 22m RCC Inverted Girder Bridge on Golakandail Dorikandi Mouza Road at Ch 1052m under Upazila : Rupganj, District: Narayanganj Road ID No. 367683011.
Package no: GDP-3/NA-88
|
GDP-3
|
rupganj
|
|
|
22.00
|
|
235.75
|
Samrat Enterprise
|
230.00
|
15/12/2022
|
18/12/2022
|
09/06/2024
|
100
|
|
|
01/07/2024
|
|
88
|
GDP-3/ NA-71
|
Improvement of Demara Kaligonj Road Liton Member Bari- Zangir Konapara Via Kudur Market Road by RCC at Ch. 0.00-600m under Upazila: Rupganj District: Narayanganj Road ID No. 367685461.
Package no: GDP-3/ NA-71
|
GDP-3
|
rupganj
|
|
0.60
|
|
|
187.87
|
M/S E.M TRADERS
|
178.48
|
|
|
|
100
|
|
|
05/07/2023
|
|
89
|
Package no: GDP-3/NA-84
|
Improvement of Chanpar Punorbashon Centre Word No-9 Minto Bari Hotel – Ward no-8 Somoddur Bari Road By RCC at Ch. 00-190m under Upazila: Rupganj, District: Narayanganj Road ID No. 367685486.
Package no: GDP-3/NA-84
|
GDP-3
|
rupganj
|
|
0.19
|
|
|
59.29
|
M/S Rakib Enterprise
|
56.33
|
04/03/2022
|
04/10/2022
|
04/10/2023
|
100
|
|
|
07/05/2023
|
|
90
|
GDP-3/NA-83
|
Improvement of Chanpar Punorbashon Centre Word No-8 Taru Mia Bari To Sultan shop Road By RCC at Ch. 00-149m under Upazila: Rupganj, District: Narayanganj Road ID No. 367685485
Package no: GDP-3/NA-83
|
GDP-3
|
rupganj
|
|
0.15
|
|
|
43.82
|
M/S. SOHANA ENTERPRISE,
|
41.63
|
27/03/2022
|
03/04/2022
|
03/04/2023
|
100
|
|
|
31/10/2022
|
|
91
|
GDP-3/NA-68
|
Improvement of Tangrartead to Kali (Kali BC Road To Tangrarteak Jame Mosque) Road by RCC at Ch. 0.00-740m under Upazila: Rupganj District: Narayanganj Road ID No. 367685202.
Salvage Cost Tk. 1,26,164.00
Package no: GDP-3/NA-68
|
GDP-3
|
rupganj
|
|
0.74
|
|
|
138.28
|
A. R TRADING CONSTRUCTION
|
131.36
|
|
|
|
100
|
|
|
28/06/2022
|
|
92
|
GDP-3/NA-Market-69
|
Improvement of Murapara Growth Center under Upazila: Rupganj, District: Narayanganj.
Package no: GDP-3/NA-Market-69
|
GDP-3
|
rupganj
|
|
|
|
|
16.12
|
M/S CHOWDHURY BUILDERS,
|
15.31
|
|
|
|
100
|
1459637.00
|
|
27/06/2022
|
|
93
|
GDP-3/NA-50
|
1. Improvement of Mazina to Mailabo ( Maileb) by BC Road at Ch. 00-850m under Upazila: Rupganj District: Narayanganj Road ID No. 367685244
2. Improvement of Boruna Primary School - Dattabari Road by BC at Ch. 00-280m under Upazila: Rupganj District: Narayanganj Road ID No. 367685247
Package no: GDP-3/NA-50
|
GDP-3
|
rupganj
|
|
1.13
|
|
|
95.92
|
M/S Rafida Enterprise, Prop: Sayed Asfaquz Zaman Robal, Mahmudabad, Murapara, Rupganj, Narayanganj.
|
91.12
|
|
|
|
100
|
|
|
06/10/2021
|
|
94
|
GDP-3/NA-61
|
Improvement of Boruna Bazar to Basulia via Futatali by RCC Road at Ch. 00-935m under Upazila: Rupganj District: Narayanganj Road ID No. 367685246
Package no: GDP-3/NA-61
|
GDP-3
|
rupganj
|
|
0.94
|
|
|
176.25
|
M/s Rakib Enterprise - M/s Habib Enterprise JV, Murapara, Rupganj, Nanayanganj.
|
176.20
|
|
|
|
100
|
|
|
26/08/2021
|
|
95
|
GDP-3/ NA-33
|
a) Improvement of Hankur-Madhabpur Mosque to Parartek Pacca Road at Ch. 00-700m (Road ID: 367685406), b) Improvement of Takmanikpur to Hankor-Madhobpur Road at Ch. 00-810m (Road ID: 367685057), c) Improvement of Beldi GC Road Hira Market to Vaoal Shimolia
|
GDP-3
|
rupganj
|
|
1.83
|
|
|
142.47
|
M/S concord Enterprise
|
133.38
|
|
|
|
100
|
|
|
11/04/2021
|
|
96
|
GDP-3/ NA-35
|
a) Improvement of Taora Kurdi bari to Danga Pasdona Road at Ch. 00m-570m (Road ID: 367685138), b) Improvement of Agla Mahabub’s Shop to Beribadh to Agla Pry school, Agla Mosque Road at Ch. 00-640m (Road ID: 367685275), c) Improvement of Hirnal Vagboti Kha
|
GDP-3
|
rupganj
|
|
2.88
|
|
|
211.49
|
RE-MRC JV
|
211.14
|
|
|
|
100
|
|
|
11/04/2021
|
|
97
|
GDP-3/NA(Market)-62
|
Rehabilitation of Porshi Bazar under Upazila: Rupganj, District: Narayanganj.
Package no:GDP-3/NA(Market)-62
|
GDP-3
|
rupganj
|
|
|
|
|
15.00
|
M/S ASHIF ENTERPRISE
|
14.25
|
|
|
|
100
|
|
|
03/12/2020
|
|
98
|
GDP-3/ NA-32
|
a) Improvement of Kuliadi Pacca Road to Kagirbag Pacca Road at Ch. 00-1360m (Road ID: 367685414), b) Improvement of Potina Bazar to Agla Beri Bandth Road at Ch. 00-1425m (Road ID: 367684072) under Upazila: Rupganj, District: Narayanganj.
|
GDP-3
|
rupganj
|
|
2.79
|
|
|
219.63
|
RE-MRC JV
|
219.47
|
|
|
|
100
|
|
|
05/10/2020
|
|
99
|
GDP-3/ NA-34
|
a) Improvement of Madhobpur jakir's house to Nondibari Bridge via Tofazzol Chairman & Hankur Primary School Road at Ch. 00-1400m (Road ID: 367685407), b) Improvement of Bagla Ali Hossen’s Shop to Beribadh to Mostafa's House Road at Ch. 00-2700m (Road ID:
|
GDP-3
|
rupganj
|
|
4.10
|
|
|
294.39
|
RE-MRC JV
|
293.91
|
|
|
|
100
|
|
|
10/08/2020
|
|
100
|
Package No: GDP-3/NA-41
|
1. a) Gandhorbpur-Kornogop Rafique House - east nogor Jame Mosque (Rafique House at Gondhorbpur-Kornogop Road To east nogor Jame Mosque) by RCC Road from Ch. 00-1035.00m. Under Rupganj Upazila District: Narayanganj. Road ID No: 367685393 (367685401).
b) Improvement of Dohorgaon BC road to Sasankhola Road from Ch. 00m-800m. Under Rupganj Upazila District: Narayanganj. Road ID No: 367685168. Salvage cost Tk. 27,54,568.00
c) Improvement of Paragao Eidga to the H/O Nabi Hossain bari Road from Ch.00m-750m. Under Rupganj Upazila District: Narayanganj. Road ID No: 367685183. Salvage cost Tk. 4,14,790.00
Package No: GDP-3/NA-41
|
GDP-3
|
rupganj
|
|
2.59
|
|
|
292.55
|
Habib Enterprise-Asif & Brothers JV
|
292.49
|
|
|
|
100
|
|
|
08/07/2020
|
|
101
|
GDP-3/ NA-31
|
a) Improvement of Dighi Barabo Pappur House to Eng. Munir House Road at Ch. 00-780m by BC (Road ID: 367685405) [Salvaged materials cost Tk. 3,38,584.00], b) Improvement of Salam Member House to Labrapara Road at Ch. 00-480m by BC (Road ID: 367685229), c)
|
GDP-3
|
rupganj
|
|
3.00
|
|
|
324.59
|
M/S Asif & Brothers
|
324.58
|
|
|
|
100
|
|
|
03/06/2020
|
|
102
|
GDP-3/ NA-8
|
1.a) Improvement of Masumabad-Dighirpar Road from Ch.00m-600m by BC (Road ID-367685178), b)Improvement of Gondhorbpur Hazi bari to Boro Mosque via Prymary School Road ( Gondhorbpur Taltola to Gondhorbpur Boro Mosque) from Ch. 00m-566m by RCC (Road ID-36
|
GDP-3
|
rupganj
|
|
1.17
|
|
|
115.93
|
M/S A S Mollah Trading
|
110.13
|
|
06/10/2018
|
05/04/2019
|
100
|
|
|
10/06/2019
|
|
103
|
GDP-3/ NA-9
|
Improvement of Borpa-Mohazompur Road to Bagan bari Mosque Road (Borpa-Mohazompur Road to H/o A.Aziz Road) from Ch. 00m-1068m by RCC & BC (Road ID-367685115 , under Upazila: Rupganj, District: Narayanganj.
|
GDP-3
|
rupganj
|
|
1.07
|
|
|
90.31
|
M/S Asif & Brothers
|
85.80
|
|
07/10/2018
|
06/04/2019
|
100
|
|
|
07/03/2019
|
|
104
|
GDP-3/NA-98
|
Improvement of Mirertek Bazar-jampur UP Office Road Ch.1760m-3760m (Road ID No. 367043001) under Upazila: Sonargaon, District: Narayanganj
|
GDP-3
|
sonargaon
|
367043001
|
2.00
|
|
|
232.35
|
M/S Hasmat & Brothers
|
243.31
|
08/03/2022
|
|
|
35
|
|
|
02/09/2024
|
|
105
|
GDP-3/NA-95
|
Improvement of Fuldi Bagerpara Road (Barodi Annando Bazar GC Fuldi Via Hasem Chairman House) by BC at Ch.00m-1400m. (Road ID No. 367045022) under Upazila: Sonargaon, District: Narayanganj
|
GDP-3
|
sonargaon
|
|
1.40
|
15.00
|
|
179.08
|
M/S Sabbir Corporation
|
170.12
|
06/03/2022
|
|
|
95
|
|
|
02/09/2024
|
|
106
|
GDP-3/NA-97
|
Improvement of Chotrapasha to WAPDA bundh Road Ch.00m-1810m (Road ID No. 367044057) [Salvage Cost Tk. 2061900.00] under Upazila: Sonargaon, District: Narayanganj
|
GDP-3
|
sonargaon
|
|
1.81
|
|
|
187.92
|
M/S Anik Enterprise
|
178.52
|
08/03/2022
|
|
|
40
|
|
|
01/07/2024
|
|
107
|
GDP-3/NA-96
|
Improvement of Pirojpur UP Office-Battala Baza Road from Ch.752m-1722m (Road ID No. 367043004) under Upazila: Sonargaon, District: Narayanganj
|
GDP-3
|
sonargaon
|
|
0.97
|
|
|
126.26
|
M/S J.M Enterprise
|
119.95
|
|
|
|
70
|
|
|
01/07/2024
|
|
108
|
GDP-3/NA-102 (Remaining)
|
Remaining Work of Uazila H/Q- Panchamighat GC via Adampur Pramer Bazar Sonmandi Road at ch 6337-9640m under Upazila Sonargaon Dist Narayangan Road ID-367042009)
|
GDP-3
|
sonargaon
|
367042009
|
1.60
|
|
|
207.78
|
M/S Shamim Enterprise
|
192.26
|
|
|
|
78
|
|
|
01/07/2024
|
|
109
|
GDP-3/NA-85
|
Improvement of BSIC Pucca Road to Kutubpur Madrasa Road By RCC at Ch. 00-680m under Upazila: Sonargaon, District: Narayanganj Road ID No. 367044055
Package no: GDP-3/NA-85
|
GDP-3
|
sonargaon
|
|
0.68
|
|
|
148.89
|
M/S Nadim Enterprise, Prop: Rafiqul Islam Nannu, Gohatta, Baro nagar, Sonargaon, Narayanganj.
|
141.44
|
16/05/2022
|
24/05/2022
|
23/05/2023
|
100
|
|
|
26/09/2023
|
|
110
|
Package no: GDP-3/NA-80
|
Improvement of Ramgobidergaon – Kikertek Hat via Mogarchar Road by RCC at Ch. 998-1532.00m under Upazila: Sonargaon, District: Narayanganj Road ID No. 367044025.
Salvage Cost Tk. 2,79,449.00
Package no: GDP-3/NA-80
|
GDP-3
|
sonargaon
|
|
534.00
|
|
|
128.87
|
M/S Nadim Enterprise,
|
122.43
|
07/03/2022
|
14/03/2022
|
06/05/2023
|
100
|
|
|
04/09/2023
|
|
111
|
GDP-3/NA-86
|
Improvement of R&H to Katchpur UP Office road Via Padma Metal and Katchpur Uttarpara road by RCC at Ch. 00-738m under Upazila: Sonargaon, District: Narayanganj Road ID No. 367044049
Salvage Cost: 2,11,319.00
Package no: GDP-3/NA-86
|
GDP-3
|
sonargaon
|
|
0.74
|
|
|
143.69
|
M/S Monir Traders
|
136.51
|
06/06/2022
|
14/06/2022
|
13/06/2023
|
100
|
|
|
23/05/2023
|
|
112
|
GDP-3/ NA-37
|
a) Improvement of Amgaon Majherchar via omma (Ambag-Majherchar via Ottma) Road at Ch. 00-2221m (Road ID: 367044022) [Salvaged materials cost. Tk. 9,91,676.00], b) Improvement of Amgaon Majherchar via omma (Ambag-Majherchar via Ottma) Road at Ch. 2240-3874
|
GDP-3
|
sonargaon
|
|
3.86
|
|
|
266.56
|
M/S S. Sarker Enterprise
|
249.77
|
|
|
|
45
|
|
|
04/10/2022
|
|
113
|
GDP-3/ NA-49
|
Improvement of Upazila H/Q-Panchamighat GC via Adampur Pramer Bazar Sonmandi Road at Ch. 6337-9640m under Upazila: Sonargaon, District: Narayanganj, Road ID No. 367042009.
Salvage Cost: 11,89,692.00
Package no: GDP-3/ NA-49
|
GDP-3
|
sonargaon
|
|
3.30
|
|
|
322.26
|
M/S S. Sarker Enterprise, Lotobdi, Sirajdikhan, Munshiganj.
|
299.92
|
|
|
|
55
|
|
|
29/08/2022
|
|
114
|
GDP-3/NA-63
|
Improvement of Pramer Bazar-Bangla Bazar Road at Ch. 00-1750m under Upazila: Sonargaon District: Narayanganj Road ID No. 367044008.
Package no:GDP-3/NA-63
|
GDP-3
|
sonargaon
|
|
1.75
|
|
|
142.98
|
Messrs Razu and Raquib Enterprise,
|
135.83
|
|
|
|
100
|
|
|
03/01/2022
|
|
115
|
GDP-3/NA- 43
|
Constuction of 37m Long RCC Girder Bridge at Ch.3+758km. from Noyapur NHW-Gangapur GC Road under Upazila Sonargaon, District: Narayanganj Road ID no.367042005
Package no: GDP-3/NA- 43
|
GDP-3
|
sonargaon
|
|
|
37.00
|
|
273.47
|
Orient Trade International,17/18, Akhoy Das Lane, Gendaria, Dhaka-1204.
|
258.28
|
|
|
|
100
|
295.50
|
|
26/08/2021
|
|
116
|
GDP-3/NA-44
|
1. a) Constuction of 22m Long Inverted RCC Girder Bridge at Ch.2+870km. from Sonargaon Bazar(Panam)-Ananda Bazar GC via Hamsadi Road under Upazila Sonargaon, District: Narayanganj Road ID no.367043007
b) Constuction of 24m Long Inverted RCC Girder Bridge at Ch.4+300km. from Upazila H//Q to Panchamighat Road under Upazila Sonargaon, District: Narayanganj Road ID no.367042009
Package no: GDP-3/NA-44
|
GDP-3
|
sonargaon
|
|
|
22.00
|
|
332.27
|
Orient Trade International,17/18, Akhoy Das Lane, Gendaria, Dhaka-1204.
|
314.16
|
|
|
|
100
|
|
|
26/08/2021
|
|
117
|
GDP-3/NA-52
|
Improvement of Sonmandi UP Noakandi – West Sonmandi Old Zame Mosque via Kafaiakanda Road ( Darikandi Barodi Road at Noakandi- Kafaiakanda) at Ch. 00-1000m under Upazila: Sonargaon, District: Narayanganj Road ID No. 367045131(367044072)
Package no: GDP-3/NA-52
|
GDP-3
|
sonargaon
|
|
1.00
|
|
|
78.41
|
M/S Nadim Enterprise, Pror: Rafiqul Islam Nannu, Gohatta, Baronagar, Sonargaon, Narayanganj.
|
74.49
|
|
|
|
100
|
|
|
26/08/2021
|
|
118
|
GDP-3/ NA-36
|
a) Improvement of Hamsadi-Premar Bazar Road (Hamsadi west para Bridge Hamsadi Madrasha) at Ch. 680-1366m Road ID: 367044028) b) Improvement of Batarkandi-Kuichamara Majer char Road at Ch. 00-1400m (Road ID: 367044015) under Upazila: Sonargaon, District: N
|
GDP-3
|
sonargaon
|
|
2.09
|
|
|
130.64
|
M/S A.S.B Enterprise
|
124.11
|
|
|
|
100
|
|
|
04/11/2020
|
|
119
|
GDP-3/NA-59
|
Improvement of Katchpur-Changain Road by BC at Ch. 2130-3340m under Upazila: Sonargaon District: Narayanganj Road ID No. 367044003. Salvage Cost Tk. 22,07,323.00
Package no: GDP-3/NA-59
|
GDP-3
|
sonargaon
|
|
1.21
|
|
|
96.00
|
Aristocratic Construction Firm, Mouchak, Sanarpar, Siddirganj, Narayanganj
|
91.20
|
|
|
|
100
|
|
|
03/06/2020
|
|
120
|
GDP-iv/NAR/ RUP/WR-62
|
Development of Dhak abipass to golakandail notun bazar road by RCC (Ch. 0-790m) (Road ID 367684026)
|
GDP-4
|
rupganj
|
367684026
|
0.79
|
|
100
|
124.47
|
M/S Rabby Enterprise
|
127.29
|
12/06/2019
|
|
18/06/2020
|
100
|
127.22
|
100
|
07/11/2022
|
|
121
|
GDP-iv/NAR/ RUP/WR-63
|
Development of vaola murapara vaola bazar road to aziz nagar bridge road (Ch. 0-950m)
|
GDP-4
|
rupganj
|
367685398
|
0.95
|
|
100
|
135.20
|
Habib Enterprise-Asif& Brothers JV
|
135.15
|
01/07/2019
|
|
07/07/2020
|
100
|
135.15
|
100
|
07/11/2022
|
|
122
|
GSIDP/NRG/DW-5
|
Improvement of Girda South Para Zame Mosque. Union: Duptara, Latitude: 90.6014, Longitude: 23.7849
|
GSIDP
|
araihazar
|
|
|
|
|
5.00
|
M/S Nazmul Enterprise
|
5.00
|
|
|
|
0
|
|
|
|
|
123
|
GSIDP/NRG/DW-6
|
Improvement of Kumarpara Pathita Para Zame Mosque. Union: Duptara, Latitude: 90.610, Longitude: 23.803
|
GSIDP
|
araihazar
|
|
|
|
|
4.99
|
M/S Nazmul Enterprise
|
4.99
|
|
|
|
0
|
|
|
|
|
124
|
GSIDP/NRG/DW-7
|
Improvement of Hatkhola Para Edghah. Union: Duptara, Latitude: 90.602, Longitude: 23.801
|
GSIDP
|
araihazar
|
|
|
|
|
15.95
|
M/S. Erik Enterprise
|
16.74
|
|
|
|
0
|
|
|
|
|
125
|
GSIDP/NRG/DW-8
|
Improvement of Lokhkhibordi Eidgha. Union: Gopaldi, Latitude: 23.80507, Longitude: 90.70411
|
GSIDP
|
araihazar
|
|
|
|
|
0.00
|
M/S Abul Traders
|
5.00
|
|
|
|
0
|
|
|
|
|
126
|
GSIDP/NRG/DW-9
|
Improvement of Dhondi Eidgha. Union: Haijadi, Latitude: 23.7469, Longitude: 90.6288
|
GSIDP
|
araihazar
|
|
|
|
|
0.00
|
M/S Masum Builders
|
10.50
|
|
|
|
0
|
|
|
|
|
127
|
GSIDP/NRG/DW-10
|
Improvement of Bajbi Graveyerd. Union: Duptara, Latitude: 23.7961, Longitude: 90.5966
|
GSIDP
|
araihazar
|
|
|
|
|
15.00
|
M/S Nazmul Enterprise
|
15.00
|
|
|
|
0
|
|
|
|
|
128
|
GSIDP/NRG/DW-1
|
Improvement of Noni Sadur’s Ashram. Union: Dhamgar, Latitude: 23.66254, Longitude:90.57113
|
GSIDP
|
bandar
|
|
|
|
|
9.07
|
M/S. Al-Mizan Construction and Supplliers
|
9.07
|
|
|
|
0
|
|
|
|
|
129
|
GSIDP/NRG/DW-2
|
Improvement of Bandar Chowdhuri Bari Eidgah Math. Union: Bandar, Latitude: 23.61518, Longitude: 90.52618
|
GSIDP
|
bandar
|
|
|
|
|
10.12
|
M/S Zihad Enterprise
|
10.12
|
|
|
|
0
|
|
|
|
|
130
|
GSIDP/NRG/DW-3
|
Improvement of Lakshmon Khola Graveyard. Union: Mushapur, Latitude: 23.1494, Longitude: 90.53073
|
GSIDP
|
bandar
|
|
|
|
|
15.95
|
M/S. Al-Mizan Construction and Supplliers
|
15.95
|
|
|
|
0
|
|
|
|
|
131
|
GSIDP/NRG/DW-4
|
Improvement of Dakshin Char Gharmora Zam-E-Mosque. Union: Kalagachia, Latitude: 23.58451, Longitude: 90.52648
|
GSIDP
|
bandar
|
|
|
|
|
15.02
|
M/S. J M Enterprise
|
15.02
|
|
|
|
0
|
|
|
|
|
132
|
GSIDP/NRG/DW-11
|
Improvement of Hajrathpur Jangalshahee Jame Mosque. Union: Sonmandi, Latitude: 23.6736, Longitude: 90.58437
|
GSIDP
|
sonargaon
|
|
|
|
|
8.00
|
M/S .A.S.B Enterprise.Pro-Ekramul Karim
|
7.60
|
|
|
|
0
|
|
|
|
|
133
|
GSIDP/NRG/DW-12
|
Improvement of Habibpur Jame Mosque. Union: Mograpara, Latitude:23.6358, Longitude: 90.61472
|
GSIDP
|
sonargaon
|
|
|
|
|
0.00
|
M/S .A.S.B Enterprise.Pro-Ekramul Karim
|
7.60
|
|
|
15/11/2018
|
100
|
|
|
|
|
134
|
GSIDP/NRG/DW-13
|
Improvement of Nanakhi Moulabi Jame Mosque. Union: Sadipur, Latitude: 23.7116, Longitude: 90.5908
|
GSIDP
|
sonargaon
|
|
|
|
|
5.31
|
M/S .A.S.B Enterprise.Pro-Ekramul Karim
|
5.04
|
|
|
|
0
|
|
|
|
|
135
|
GSIDP/NRG/DW-14
|
Improvement of Ananda Bazar Baitul Karim Jame Mosque. Union: Baiddarbazar, Latitude: 23.6697, Longitude: 90.6358
|
GSIDP
|
sonargaon
|
|
|
|
|
10.16
|
M/S .A.S.B Enterprise.Pro-Ekramul Karim
|
9.65
|
|
|
|
0
|
|
|
|
|
136
|
GSIDP/NRG/DW-15
|
Improvement of Hossinpur Jame Mosque near Hossainpur School. Union: Shambupura, Latitude: 23.6405, Longitude: 90.5783
|
GSIDP
|
sonargaon
|
|
|
|
|
5.67
|
M/S .A.S.B Enterprise.Pro-Ekramul Karim
|
5.39
|
|
|
|
0
|
|
|
|
|
137
|
IRIDP-2/NRG/DW-12
|
Improvement of Puran Bandar Noor pur Pacca road - Vadrashan RHD Road from Ch. 00-1445m.
|
IRIDP-2
|
bandar
|
|
1.40
|
|
|
129.04
|
M/S. Ahsan Enterprise
|
12.80
|
|
21/11/2016
|
31/05/2017
|
100
|
|
|
|
|
138
|
IRIDP-2/NRG/DW-13
|
Improvement of Rustompur-Shelsardi Road from Ch.00-875m.
|
IRIDP-2
|
bandar
|
|
0.87
|
|
|
82.76
|
M/S. Ahsan Enterprise
|
82.14
|
|
16/03/2016
|
23/03/2017
|
100
|
|
|
|
|
139
|
IRIDP-2/NRG/DW-14
|
Improvement of Haluapara bazar-Langolbandh Road from Ch.00-1000m.
|
IRIDP-2
|
bandar
|
|
1.00
|
|
|
107.80
|
M/S. Aristocatic Construction Firm
|
107.42
|
|
28/03/2016
|
10/08/2016
|
100
|
|
|
|
|
140
|
IRIDP-2/NRG/DW-15
|
Improvement of Madanpur R&H-Madanpur H/O Kalai Hossain Road from Ch.00-600m.
|
IRIDP-2
|
bandar
|
|
0.60
|
|
|
63.68
|
M/S Hasib Enterprise
|
63.62
|
|
15/03/2016
|
31/01/2017
|
100
|
|
|
|
|
141
|
IRIDP-2/NRG/DW-1
|
IRIDP-2/NRG/DW-1
|
IRIDP-2
|
rupganj
|
|
0.30
|
|
|
22.73
|
M/S Dewan Trading
|
22.71
|
|
10/03/2016
|
22/02/2017
|
100
|
|
|
|
|
142
|
IRIDP-2/NRG/DW-2
|
Improvement of Rupshi sluitch Gate-Kahina Road from Ch.600-885m.
|
IRIDP-2
|
rupganj
|
|
0.28
|
|
|
29.08
|
M/S Rakib Enterprise
|
29.08
|
|
27/03/2016
|
29/05/2016
|
100
|
|
|
|
|
143
|
IRIDP-2/NRG/DW-3
|
Improvement of Ropshi-Kanchon GC road (Rohima food mill) to Ropshi Bazar Road from Ch.00-275m.
|
IRIDP-2
|
rupganj
|
|
0.27
|
|
|
37.07
|
M/S Asif & Brothers
|
37.03
|
|
14/03/2016
|
20/12/2018
|
45
|
|
|
|
|
144
|
IRIDP-2/NRG/DW-4
|
Improvement of Rupshi-Kanchon GC to Dagarkhal via Karnogoup ,Gondrabpur Road from Ch.0.00-1000m.
|
IRIDP-2
|
rupganj
|
|
1.00
|
|
|
57.78
|
M/S Rakib Enterprise
|
57.78
|
|
27/03/2016
|
30/07/2017
|
100
|
|
|
|
|
145
|
IRIDP-2/NRG/DW-5
|
Improvement of Hatabo Abul Market to Enaet Market Road from Ch.800-1800m.
|
IRIDP-2
|
rupganj
|
|
1.00
|
|
|
57.79
|
M/S Concord Enterprise
|
54.55
|
|
08/08/2016
|
19/09/2016
|
100
|
|
|
|
|
146
|
IRIDP-2/NRG/DW-6
|
Improvement of Chanpara punorbasonkendra word no. 4 from Ch.00-384m.
|
IRIDP-2
|
rupganj
|
|
0.38
|
|
|
27.28
|
M/S Progoti Traders
|
27.25
|
|
27/03/2016
|
30/06/2017
|
100
|
|
|
|
|
147
|
IRIDP-2/NRG/DW-7
|
Improvement of Rupshi-KanchonGC road Sluice gate Kazi Rafiq house to Sohrab house via Graveyard, House of Ali Azgor Road from Ch.00-280m.
|
IRIDP-2
|
rupganj
|
|
0.28
|
|
|
41.71
|
M/S Asif & Brothers
|
41.70
|
|
14/03/2016
|
15/05/2016
|
100
|
|
|
|
|
148
|
IRIDP-2/NRG/DW-8
|
Improvement of Borpa Ahamed Re-Rolling Mill to Santi Nagar Zame Mosque Road from Ch.00-800m.
|
IRIDP-2
|
rupganj
|
|
0.80
|
|
|
46.35
|
M/S Imtiaz Enterprise
|
46.31
|
|
13/03/2016
|
07/04/2016
|
100
|
|
|
|
|
149
|
IRIDP-2/NRG/DW-9
|
Improvement of Barpa RHD - Sutolara Beribundh Road from Ch.2000m-2250m.
|
IRIDP-2
|
rupganj
|
|
0.25
|
|
|
14.55
|
M/S A.S. Mollah Trading
|
14.49
|
|
15/03/2016
|
21/06/2016
|
100
|
|
|
|
|
150
|
IRIDP-2/NRG/DW-10
|
Improvement of Khadun Haji Ayet Ali High School to Mograkul Road from Ch.700-1100.
|
IRIDP-2
|
rupganj
|
|
0.40
|
|
|
56.26
|
M/S Asif & Brothers
|
56.19
|
|
29/02/2016
|
05/05/2016
|
100
|
|
|
|
|
151
|
IRIDP-2/NRG/DW-11
|
Improvement of Anupam Garments to Majhipara(Dhaka-Sylhet RHD Aunopom Garments to Koirabo Mosque) Road from Ch.00-667m.
|
IRIDP-2
|
rupganj
|
|
0.66
|
|
|
38.52
|
M/S Azmat trading
|
38.51
|
|
13/03/2016
|
30/04/2017
|
100
|
|
|
|
|
152
|
LMAHBFP/WD-1
|
Construction of 1 No. RCC Nasim Osman Ghat at the West Bank of Brahammaputra River under Upazila: Bandar, District: Narayanganj.
|
LMAHBFP
|
bandar
|
|
|
1.00
|
60
|
10850000.00
|
M/S S R Enterprise
|
10847646.77
|
24/05/2018
|
30/05/2018
|
29/05/2019
|
60
|
5839930.00
|
60
|
29/08/2022
|
|
153
|
LMAHBFP/WD-2
|
Construction of 1 No. RCC Brishnupria Ghat at the West Bank of Brahammaputra River under Upazila: Bandar, District: Narayanganj.
|
LMAHBFP
|
bandar
|
|
|
|
100
|
108.50
|
M/S Ahasan Enterprise
|
108.45
|
24/05/2018
|
30/05/2018
|
30/06/2020
|
100
|
10727722.00
|
100
|
29/08/2022
|
|
154
|
LMAHBFP/WD-3
|
Construction of 1 No. RCC Annapurna Ghat at the West Bank of Brahammaputra River under Upazila: Bandar, District: Narayanganj.
|
LMAHBFP
|
bandar
|
|
|
|
100
|
108.50
|
108.47646774
|
0.00
|
|
30/05/2018
|
29/05/2019
|
100
|
10288894.00
|
100
|
29/08/2022
|
|
155
|
LMAHBFP/WD-4
|
Construction of 1 No. RCC Raj Ghat No.-1 at the West Bank of Brahammaputra River under Upazila: Bandar, District: Narayanganj.
|
LMAHBFP
|
bandar
|
|
|
|
|
108.50
|
108.45495731
|
0.00
|
|
30/05/2018
|
29/05/2019
|
55
|
3113461.00
|
|
29/08/2022
|
|
156
|
LMAHBFP/WD-5
|
Construction of 1 No. RCC Raj Ghat No.-2 at the West Bank of Brahammaputra River under Upazila: Bandar, District: Narayanganj.
|
LMAHBFP
|
bandar
|
|
|
|
|
108.50
|
108.4783
|
0.00
|
|
05/09/2018
|
04/06/2019
|
55
|
3114257.00
|
|
29/08/2022
|
|
157
|
LMAHBFP/WD-6
|
|