Loading...

Narayanganj

LGED NARAYANGANJ , District Scheme Details

Project Name
Upazila

District Scheme Details

SL No. Package No. Package Name Project Name Upazila Name Road ID Length of Road (Km) Length of Bridge (M) Building Qauntity (No) Estimated Amount (Lac) Name of Contractor Contract Amount (Lac) Date of Contract Date of Commencement Date of Completion Physical Progress (%) Financial Progress (Amt) Financial Progress (%) Date of Progress Update Remarks
1 NCC2-01 a) Improvement of Bhasha Sainik Sarak by RCC with Footpath cum RCC drains in ward no-13 (Ch 0+00 to 0+400.00m), b) Construction of CC road with RCC drain beside Paikpara Big Graveyard in ward no-17 & 18 (Ch 0+00 to 0+700.00m), c)Construction of RCC road & Drain starting from Shantibag Stadium road near EURO Garments upto north line of Islam Nagar WAPDA canal in ward No:08 (Ch 0+00 to 0+ 615m ) . CGP narayanganj-s 4.13 711.25 MAM Construction Ltd 674.79 12/07/2017 30/11/2018 0  
2 NCC2-02 a) Re-habilitation of road & drain with link from lithi garmentsd to dhaka-Chittagong highway road vai london market & Nemai kaisari bazer by RCC in ward-03 Length 1582 & 8 nos. Link road length:2796.0m Total Effective length4378.0m CGP narayanganj-s 11.39 1931.42 M/S Ratna Enterprise 1693.74 08/10/2017 08/11/2018 0  
3 NCC2-03 Re-construction of road by RCC with Road Side RCC Drain, from Nobiganj Bazar to Dakesshay Mill. Ch(00-4432m) including some Links CGP narayanganj-s 16.05 2841.86 Rana Builders & Hasan Builders (JV) 2700.33 23/05/2017 31/12/2018 0  
4 NCC2-04 a) Construction of 18m etre span RCC Tribini Bridge over Tribini Khal on Madanganj power grid to Nabigonj bus stand Road at Chainage 1+735 m. Ward-21 b)Construction of 20m metre span RCC Baparipara Bridge over Baparipara Khal on Madanganj power grid to Nabigonj bus stand Road at Chainage 0+370 m. CGP narayanganj-s 0.04 892.12 Prominent -Quashem (JV) 779.16 05/03/2017 31/12/2018 0  
5 NCC2-05 a) Construction of 15m long RCC bridge over WAPDA canal near Lithigarments at ward no-3,; 14m long RCC bridge (Abdul Ali pool) at ward no-2, 10m long RCC culvert near Rahim market at ward-02, b) Reconstruction of 60m long RCC birdge over Shitalakkhya Khal at Shaheed Nagar in ward no-18 c) Reconstruction of 60m long RCC bridge over Shitalakkhya khal at Sayedpur in ward no-18, d) Construction of 12m long RCC bridge over Nolkhali Khal near Knit conern at ward no-10. CGP narayanganj-s 0.13 2098.27 Prominent -Quashem (JV) 1845.95 05/03/2017 31/12/2018 0  
6 NCC2-06 Construction of 20m span RCC Luhia Bridge over Nabiganj Khal on Nobiganj Bazar to Dakesshay Mill Road at Chainage 0+350m and 22m span RCC Lakankhola Brige over Lakhankhola Khal on Nobiganj Bazar to Dakesshay Mill Road at Chainage 2+750. CGP narayanganj-s 0.04 556.34 Prominent -Quashem (JV) 482.36 05/03/2017 31/10/2018 0  
7 NCC2-10 (i) Construction of 40.00m long RCC foot over bridge over WAPDA main canal at Ch.0+280km (ii) Construction of 33.00m long RCC bridge over WAPDA main canal at Ch.1+200km (iii) Construction of 38.00m long RCC bridge over WAPDA main canal at Ch.2+130km (iv) Construction of 46.25m long RCC foot over bridge over WAPDA main canal at Ch.2+630km (v) Construction of 34.00m long RCC bridge over WAPDA main canal at Ch. 3+550km (vi) Construction of 37.00m long RCC foot over bridege over WAPDA main canal at Ch.5+150km. CGP narayanganj-s 0.23 3813.80 Mir Habibul Alam-Udayan Builders(JV) 3584.87 25/11/2018 19/03/2020 0  
8 NCC2-11 Re-construction of road by RCC with Road Side RCC Drain, from Nobiganj Bazar to Dakesshay Mill. Ch(00-4432m) including some Links CGP narayanganj-s 3.91 791.31 M/S Munia Traders 749.43 23/05/2017 17/10/2018 0  
9 NCC2-12 a) Re-construction of Road and Drain by RCC starting from AEPZ Road to Sumilpara Road in ward No-06 at Ch.000 to 0646. b) Re-construction of Char Sumilpara road by RCC with RCC drain in ward No06 Length350m & 6 nos link road length 1099m total effective length1449m. c) Re-construction of RCC road with RCC drain from Kaiums house to Noardapara moszid in ward no-24 Length86m & 1 Nos Link Road Length134m Total Effective length220m. d) Construction of Road by RCC with side drain in Shitolankha housing under Ward no.11including 4 Nos Link Road Effective length674m. e) Re-construction of drain & road by RCC from 100-0 road to Baitul Mamur Madrasha via Roman house beside Kadamrasul College in ward no-23Length400m & 1 Nos Link Road Length117m Total Effective length517m. f) Re-construction of RCC road with RCC drain from Bugbari Bus road to Bhandary bari in ward no-23 (Ch.000 to 0480). CGP narayanganj-s 8.61 1180.24 Starline Services Limited 1068.11 08/10/2017 13/12/2018 0  
10 NCC2-07 Re-excavation of main canal from bhangar poll to Shimrail galakata bridge along with Protective Works by CC Block lining at west side of the main canal in Siddhirganj (Ch.0+000km to 5+538Km) at both sides. CGP narayanganj-s 5.20 5834.50   0.00 0 Evaluation on process
11 NCC2-09 a) Construction of RCC Drain Starting from Godnail Lal Building to Anayetnagar Lacky Bazzar Ch.0+000-2+505. (b) Construction of Drain (RCC/Brick/Pipe) Starting from Tatkhana more upto WAPDA Canal via Sayedpara wooden bridge, sayedpara kafil uddin Garments & the H/O mr. shamim at ward no.-08. Ch.0+000-0+670. (Total Length with 7 link drain=1616.0m) (c) Construction of RCC Drain(RCC/Brick/Pipe) Starting from Tatkhana Government Primary school to Chowdhuri bari road via Dr. Kuddus house at word no.-8. Ch.0+000-0+292 & Link Ch.0+000-0+100. (d) Construction of RCC Drain(RCC/Brick/Pipe) Starting from Starting from Dhanakunda Saudbari to rail line & Barepara Aklim Mia House at ward No.-08. Ch.0+000-0+170. (e) Construction of drain (RCC/Brick/Pipe) starting from Modhugar connecting upto WAPDA canal at ward no-08.Ch.0+000-0+356. Total Length (including 8 nos. Link Drain)=1840m. (f) Construction of Drain (RCC/Brick/Pipe) at Jhalkuri Starting from amtala mor to wapda canal via east side & Jhalkuri khola market at word no.-9. Ch.0+000-0+735, Ch.0+000-0+493(Link-1), Ch.0+000-0+288(Link-2). (g) Construction of Drain (RCC/Brick/Pipe) at Jhalkuri Starting from Jalkuri Naintarpar to Karoitala via Firoz Master House at ward no.-09. Ch.0+000-0+650, Ch.0+000-0+599(Link-1), Ch.0+000-0+100(Link-2), Ch.0+000-0+118(Link-3). (h) Construction of drain (RCC/Brick/Pipe) at Jalkuri starting from Jalkuri Wapda canal Culvert to end of NCC & Goramara Mosque-E-Noor via Rajmahal Chinema Hall at ward no-9. Ch.0+000-0+225, Total Length (including Link drain)=837m. (i) Construction of Drain (RCC/Brick/Pipe) at Jhalkuri Starting from Jalkuri Transmeter to Sheikderbari pool via Taher Ali House & Jalkuri Graveyard at ward no.-9. Ch.0+000-0+580. Ch.0+000-0+580(Link-1), Ch.0+000-0+190(Link-2) (j) Construction of Drain (RCC/Brick/Pipe) at Jhalkuri Starting from Modhugar Mojibor Poulty firm to Wapda canal near Ali Hossain House via Dewan Jame Mosque at ward no-9. Ch.0+000-0+400, Ch.0+000-0+370(Link-1), Ch.0+000-0+580(Link-2) CGP narayanganj-s 12.87 2144.52 Mir Habibul Alam-Udayan Builders(JV) 1917.36 10/08/2017 13/12/2018 0  
12 CIB-Nar-W-35 Const. of 320m long PSC Girder Bridge over the river Balu at Ch. 00.00m on Porshi G.C-Rupganj-Kayetpara -Demra RHD road at Isapura under Rupganj Upazila, District: Narayanganj. CIBRR rupganj [Road ID: 367682001] 320.00 69 3807.66 M/S Prominent-Qushem-PPL(JV) 3888.20 07/08/2018 13/08/2018 31/08/2024 82 2718.31 69 04/08/2024 WORKS ON GOING
13 CIB-Nar-W-35(b) Const. of 250m Vaiduct of 320m long PSC Girder Bridge over the river Balu at Ch. 00.00m on Porshi G.C-Rupganj-Kayetpara -Demra RHD road at Isapura Part under Rupganj Upazila, District: Narayanganj. CIBRR rupganj 367682001 250.00 21 2444.95 KINGDOM Builders Limited,House No. 470,Road-31, DOHS, Mohakhali, Dhaka-1206. 2178.24 08/12/2021 15/12/2021 14/06/2024 39 558.28 21 04/08/2024 WORKS ON GOING
14 CIB-Nar-W-41 "Construction of 625.35m Long Bridge Over Balu River On Demra- Kamshire Road On Keodhala -Kayetpara Nadirghat Road at Chainage 290m Under Rupganj Upazila, District: Narayanganj. [ Road ID: 367685042] CIB-Nar-W-41 " CIBRR rupganj 367685042 625.35 9763.72 SEL-KBL-UCC JV 9763.72 22/04/2024 29/04/2024 28/04/2027 0 04/08/2024 Financial Tender Evulation Sent to Ministry
15 CIB-Nar-W-35(b) "(b) Const. of 250m Vaiduct of 320m long PSC Girder Bridge over the river Balu at Ch. 00.00m on Porshi G.C-Rupganj-Kayetpara -Demra RHD road at Isapura Part under Rupganj Upazila, District: Narayanganj. [Road ID: 367682001] CIB-Nar-W-35(b)" CIBRR rupganj 367682001 0 9763.72 0.00 0 0.00 0 05/10/2023
16 CRDP-II/LGED/NARAYANGANJ/ARAIHAZAR/NCB/2018/W-01 Road ID # 367024082: Improvement of Road from Binaichar-Kamrangir Char Road. (ch.0-3434m) , Road ID # 367024082: Construction of 15.00m Long RCC Girder Bridge at ch:0+689m on Binaichar-Kamrangir Char Road. , Road ID # 367024083: Improvement of Road from Fakirbari-Kamrangir char-Majerchar Gopindir School Road. (ch.0-4077m) ; Road ID # 367024083: Construction of 3.0m x 2.50m RCC Box Culvert at ch.0+774m on Fakirbari-Kamrangirchar-Majerchar Gopindir School Road. ; Road ID # 367024083: Construction of 4.50m x 4.50m RCC Box Culvert at ch.1+067m on Fakirbari-Kamrangirchar-Majerchar Gopindir School Road. ; Road ID # 367024083: Construction of 4.00m x 4.00m RCC Box Culvert at ch.2+499m on Fakirbari-Kamrangirchar-Majerchar Gopindir School Road. ; Road ID # 367024083: Construction of RCC Box drain along the Fakirbari-Kamrangirchar Majerchar Gopindir School Road. (ch.0-260m) & (ch.2250-2350m) ; Road ID # 367024083: Improvement of Road from Bagbari-Nowagoan Road . (ch.0+00-4+245m) (Road ID-4080); Road ID # 367024080: Construction of RCC Box drain along the Bagbari-Nowagoan Road. (Length=470m) , Road ID # 367024004: Improvement of Road from Mukandi-Araihazar Narsinghdi R&H Road.(ch.0+00-1+500m) & Link-01 (ch.0+00-0+300m) ; Road ID # 367024004: Construction of 3 nos 1.00m x 1.200m RCC Cross Drain at ch. 1+094m, ch.1+396m & ch.0+138m Link-01 on Mukundi-Araihazar Road. ; Improvement of road from Government Safar Ali Collage - Araihazar Upazila Porishod - RHD via Mohila Collage (Ch.0-1000m) (Road ID # 367024095) including 799m link road ; CRDP-2 araihazar 367024082, 367024083, 3670240004 13.66 29.50 0 2412.37 MEC Engineers & Construction Ltd. 2361.02 15/09/2019 29/09/2019 05/02/2021 20 486.10 0 30/06/2020 As per contract Agreement 10% Mobiization Advance Paid
17 CRDP-II/LGED/NARAYANGANJ/ARAIHAZAR/NCB/2018/W-02 Improvement of road from Government Safar Ali Collage - Araihazar Upazila Porishod - RHD via Mohila Collage (Ch.0-1000m) (Road ID # 367024095) including 799m link road ; Construction of 4.00m x 4.00m Box Culvert at Ch. 660m on Government Safar Ali Collage - Araihazar Upazila Porishod-RHD via Mohela Collage (Road ID # 367024095); Construction of RCC drain along the Government Safar Ali Collage - Araihazar Upazila Porishod-RHD via Mohela Collage (Ch.0-900m) (Road ID # 367024095); Improvement of RHD Araihazar bazar - Araihazar Purinda road (Ch.0-1126m) (Road ID # 367024094) including 517m link road; Construction of RCC drain along the RHD Araihazar bazar - Araihazar Purinda road (Ch.0-576m) (Road ID # 367024094); Construction of RCC drain along the Araihazar Gol Chakkor Box Culvert to Dakkhin Para Steel Bridge road (Ch.0-1000m) including 315m link drain; Improvement of Laskardi - Langardi Bazar road (Ch.0-2200m) (Road ID # 367024072); Construction of 5.00m x 5.00m Box Culvert at Ch.1430m on Laskardi - Langardi Bazar road (Road ID # 367024072); Improvement of Kalibari bazar - Panchrukhy road (Ch.0-3520m) (Road ID # 367024081); Construction of railing and wheel guard of 2 x 4.60m x 4.60m Box Culvert at Ch.1295m on Kalibari bazar - Panchrukhy road (Road ID # 367024081); Construction of railing and wheel guard of 3 x 4.50m x 4.50m Box Culvert at Ch.2870m on Kalibari bazar - Panchrukhy road (Road ID # 367024081); Improvement of Dhuptara - Buntim Pullah road (Ch. 0 - 3007m) (Road ID # 367024077); Construction of 4.50m x 4.50m Box Culvert at Ch.1856m on Dhuptara - Buntim Pullah road (Road ID # 367024077); Construction of 2x 5.00m x 5.00m Box Culvert at Ch.2630m on Dhuptara - Buntim Pullah road (Road ID # 367024077); Construction of RCC drain from Araihazar Bazar Krisnochura to Dakkhin Para Oucha Bridge road (Ch.0-900m ) (Road ID # 367024077); CRDP-2 araihazar 367024095, 367024094, 367024072, 367024081, 367024077 12.17 46.20 0 4139.85 JV of NCEL-PDL 3965.11 27/10/2019 10/11/2019 24/03/2021 12 603.16 0 30/06/2020 As per contract Agreement 10% Mobiization Advance Paid
18 CRDP-II/LGED/NARAYANGANJ/RUPGANJ/NCB/2018/W-02 Improvement of Kanchan GC - Sornakhali bazar - Chanpara RHD road (Ch.0-7300m) (Road ID # 367682003), Widening of RCC Box Culvert (4.50m x 4.50m) at Ch. 836m on Kanchan GC - Sornakhali bazar - Chanpara RHD road (Road ID # 367682003). Widening of RCC Box Culvert (3.50m x 3.50m) at Ch. 2593m on Kanchan GC - Sornakhali bazar - Chanpara RHD road (Road ID # 367682003).; Construction of RCC Box Culvert (3.50m x 3.50m) at Ch. 3765m on Kanchan GC - Sornakhali bazar - Chanpara RHD road (Road ID # 367682003).; Construction of RCC Box Culvert (5.0m x 5.0m) at Ch. 6133m on Kanchan GC - Sornakhali bazar - Chanpara RHD road (Road ID # 367682003).; Construction of RCC Box Culvert (4.50m x 4.50m) at Ch. 6625m on Kanchan GC - Sornakhali bazar - Chanpara RHD road (Road ID # 367682003).; Construction of 45m long RCC girder bridge at Ch. 4855m on Kanchan GC - Sornakhali bazar - Chanpara RHD road (Road ID # 367682003).; Improvement of Kanchan GC - Atlapur bazar - Danga RHD road (Ch.5594-10200m) (Road ID # 367682004) including 80m link road.; Construction of 8 nos. cross drain (0.625m x 0.600m) on Kanchan GC - Atlapur bazar - Danga RHD road (Road ID # 367682004).; Construction of RCC drain along the Kanchan GC - Atlapur bazar - Danga RHD road (Ch.6900-7775m and Ch.9700-10250m) (Road ID # 367682004).; Improvement of Sornokhali bazar - Bolabo UP road (Ch.0-3900m) (Road ID # 367683003).; CRDP-2 rupganj 367682003, 367682004, 367683003, 15.89 72.00 12 5784.08 JV of NCEL-PDL 5477.66 27/10/2019 22/03/2021 6 659.27 12 30/06/2020 As per contract Agreement 10% Mobiization Advance Paid
19 CRDP-II/LGED/NARAYANGANJ/RUPGANJ/NCB/2018/W-03 Improvement of Rupshi-Kanchon GC to Dagarkhal via Karnogoup, Gondrabpur Road (Ch.0-3320m) (Road ID # 367684002), Improvement of Tarabo GC - Rupshi Bazar (Ch.0-2960m) (Road ID # 367683010), Improvement of Borpa RHD - Mohajampur UP Road (Ch.0-5020m) (Road ID # 367682010), Improvement of Murapara GC - Mohishvita - RHD Road (Ch.0-4780m) (Road ID # 367682007) including 2685m Link Roads., Construction of RCC Box Culvert (3.50m x 3.50m) at Ch. 1361m on Murapara GC - Mohishvita - RHD Road (Road ID # 367682007). Construction of 1000mm dia pipe culvert (2 nos.) at Ch.2755m & Ch. 2810m on Murapara GC - Mohishvita - RHD Road (Road ID # 367682007) CRDP-2 rupganj 367684002, 367683010, 367682010, 367682007, 18.77 5.50 10 4010.39 JV of NCEL-PDL 3970.05 22/01/2020 0 397.00 10 30/06/2020 As per contract Agreement 10% Mobiization Advance Paid
20 CRMIDP/NYNG/W-340 Langolbondho Bazar CRMIDP bandar 64 293.00 "M/S S.R Enterprise 69/2, North Chasara Narayanganj " 292.99 03/07/2022 30/05/2022 95 188.49 64 27/07/2022
21 CRMIDP/NYNG/W-337 Fotulla Bazar CRMIDP narayanganj-s 18 169.00 M/S Corporation 169.00 14/07/2022 01/08/2022 65 30.15 18 27/07/2022
22 GDP-3/NA-94 Improvement of Dasherdia Batala-H/O Ismail Hazi Road from Ch.960m-1715m (Road ID No. 367024070) under Upazila: Araihazar, District: Narayanganj. GDP-3 araihazar 0.76 111.57 M/S Sajid Enterprise 111.55 04/04/2022 20 06/02/2024
23 GDP-3/ NA-82 Improvement of Doyakanda Barak Mia house-Amir Uddin Chowkedar House Road By BC at Ch. 00-600m under Upazila: Araihazar, District: Narayanganj Road ID No. 367025304 Salvage Cost Tk. 36,772.00 Package no: GDP-3/ NA-82 GDP-3 araihazar 0.60 47.98 M/S MUHAMMADITRADERS 47.91 100 23/05/2023
24 GDP-3/NA-78 Improvement of Rail Line (Araihazar-Madonpur) Pacca Road to Fawsha Pacca Road by BC at Ch. 0.00-935.00m under Upazila: Araihazar District: Narayanganj Road ID No. 367025359 Salvage Cost Tk. 17,24,318.00 Package no: GDP-3/NA-78 GDP-3 araihazar 0.94 87.35 GDP-3/NA-78 82.98 100 29/01/2023
25 GDP-3/ NA-81 Improvement of Bogadi Kand Para raham Ali Member House to Noapara Chairman House Via Kandapara Atim Khana Via Bogadi Samajkallan Road By BC at Ch. 1412-2250m under Upazila: Araihazar, District: Narayanganj Road ID No. 367025279 Salvage Cost Tk. 15,19,847.00 Package no: GDP-3/ NA-81 GDP-3 araihazar 0.84 73.50 M/S FOYSAL TRADERS 73.50 100 26/07/2022
26 GDP-3/NA-79 Improvement of Pachgaon Noyapara Pacca Road- Kahunda Graveyard Road by RCC at Ch. 0.00-624.00m under Upazila: Araihazar District: Narayanganj Road ID No. 367025368 Package no: GDP-3/NA-79 GDP-3 araihazar 0.62 111.84 M/S Aliza Amin Construction, 106.24 28/02/2022 01/05/2023 100 28/06/2022
27 Package no: GDP-3/NA-66 a) Improvement of Kalibari Panchrukhi road at Ragobdi Bridge to Singrati Jumma Maszid road by BC at Ch. 00-930m under Upazila: Araihazar District: Narayanganj Road ID No. 367025355 Salvage Cost. 9,78,880.00 b) Improvement of Karaitala baily Bridge to Karaitala Sultan Repotar’s House road by BC at Ch. 00-230m under Upazila: Araihazar District: Narayanganj Road ID No. 367025293 Package no: GDP-3/NA-66 GDP-3 araihazar 1.16 104.63 M/S Masum Builders, Prop: Serajul Islam Bhuiyan, Araihazar, Narayanganj 99.40 100 98.76 19/06/2022
28 GDP-3/NA-56 1. Improvement of Dokkhinpara Nasir Dr. House to Dokkhinpara Govt. Primary School Road by BC at Ch. 00-421m under Upazila: Araihazar District: Narayanganj Road ID No. 367025217 2. Improvement of Doyakanda to Shomvupura Road by BC at Ch. 00-532m under Upazila: Araihazar District: Narayanganj Road ID No. 367025233 3. Improvement of Dasherdia (Pacca Road) to Madhobdi Ghat (Dasherdia Elies House- Field) Road by BC at Ch. 00-468m under Upazila: Araihazar District: Narayanganj Road ID No. 367025075 Package no: GDP-3/NA-56 GDP-3 araihazar 1.42 142.90 M/S Islam & Brothers, Prop: Shafiqul Islam, Baronagar, Sonargaon, Narayanganj. 135.76 100 06/10/2021
29 GDP-3/NA-64 Improvement of Tateya Hanif Doctor House-Primary School Road from Ch. 570-970m under Upazila: Araihazar District: Narayanganj Road ID No. 367025160 Package no: GDP-3/NA-64 GDP-3 araihazar 0.40 33.08 B.A.K Construction, 28.77 100 18.81 26/08/2021
30 GDP-3/NA-65 Improvement of Tateya Hanif Doctor House-Primary School Road from Ch. 970-1365m under Upazila: Araihazar District: Narayanganj Road ID No. 367025160. Package no: GDP-3/NA-65 GDP-3 araihazar 0.40 32.66 B.A.K Construction, 28.29 100 15.65 26/08/2021
31 GDP-3/NA-42 1. a) Improvement of Bagbari Noagaon Road (Dakkhin Para Mosque) – In front of Tara Miah House Road at Ch: 00-404m under Araihazar Upazila, District: Narayanganj. Road ID No: 367025375. b) Improvement of Dhaka Sylhet RHD Near of Panchrukhi GPS to Shalek Haji House Road at Ch: 00m-182m under Araihazar Upazila District: Narayanganj. Road ID No: 367025365. c) Improvement of Dhaka Sylhet RHD – Khanpara Mosque via Shiraj Molla House Road at Ch: 00m-300m under Araihazar Upazila District: Narayanganj. Road ID No: 367025366. d) Improvement of Dhaka Shibpur Main Road to Noapara Culvert via Graveyard Road at Ch: 00m-530m under Araihazar Upazila, District: Narayanganj. Road ID No: 367025289. e) Improvement of Khanpara H/O Khalil Bhayan to Mukter Khan house via Khanpara Graveyard Road at Ch: 00m-490m under Araihazar Upazila, District: Narayanganj. Road ID No: 367025352. f) Improvement of Kalibari Panchrukhi road pond of Munsurali- via Moszid to Ambor ali house Road at Ch: 00m-167m under Araihazar Upazila, District: Narayanganj. Road ID No: 367025353. g) Improvement of Baro Mollarchar Pukur Par Mosjid - Rail line (Mollerchor Bazar) via Eid Gha Road at Ch: 00m-590m under Araihazar Upazila, District: Narayanganj. Road ID No: 367025370 Package no: GDP-3/NA-42 GDP-3 araihazar 2.66 189.83 M/S S. S. Corporation, Araihazar, Narayanganj 189.67 100 03/02/2021
32 GDP-3/ NA-19 a) Improvement of Pachgaon Mollapara (Araihazar- Purinda Pacca Road)- Khodai Bari Mosque via Mollapara Madrasha Road at Ch. 0+om-0+425m.( ID No.367025369), b) Improvement of Tateya Hanif Doctor House-Primary School Road from Ch. 00m-570m.( Id No. 3670251 GDP-3 araihazar 2.50 151.29 M/S Masum Builders 151.28 05/11/2018 04/07/2019 100 03/06/2020
33 GDP-3/ NA-22 a) Improvement of Brammandi Union Parishad to Digoldi Pacca road via Mohila Madrash Road from Ch.00m-501m Under Araihazar Upazila, District: Narayanganj (ID No: 367025364), b) Improvement of Khagkanda Kadamtalir Katakhalir Bridge- Lalurkandi GPS Road from GDP-3 araihazar 1.47 142.10 M/S Masum traders 142.10 100 03/06/2020
34 GDP-3/ NA-25 a) Improvement of Salomdi Pucca Road to Primary School Road from Ch. 800m-1260m Under Araihazar Upazila, District: Narayanganj (ID No: 367025145), b) Improvement of Afordi More- Shonghodi Kanda Near H/O Soad Ali Road from Ch. 00m-1072m Under Araihazar Up GDP-3 araihazar 2.18 190.43 M/S Masum Builders 190.42 100 03/06/2020
35 GDP-3/ NA-23 a) Improvement of Rohmat Ali Mill to Pucc Road Near Waj Uddin via Muktizudda Sukkur Ali House (Panchrukhi Dakhin Molla Para Raham Ali Pradhan Mill to Pucca Road near the House of Waj Uddin Khan via H/O Emamuddin Member Road )Road from Ch.00m-510m Under A GDP-3 araihazar 1.48 91.60 M/S Nazmul Enterprise 91.60 100 05/12/2019
36 GDP-3/ NA-24 a) Improvement of Kollandi Mullah Para - Gangkul Para via Mahabub House Road from Ch.00m-288m Under Araihazar Upazila, District: Narayanganj (ID No: 367025203), b) Improvement of Baliapara Provakardi Road- Tofazzal Hossain Master House Road from Ch.00m-20 GDP-3 araihazar 1.63 123.17 M/S S.S Corporation 123.17 100 06/08/2019
37 GDP-3/NA-104 Improvement of Kushira Puran Bandar Connecting Road Giash Uddin miah house to Abil mia house Road by BC at Ch. 00-450mm Road (ID-367065157) under Upazila: Bandar, District: Narayanganj. GDP-3 bandar 367065157 0.45 53.30 M/S Sarkar Enterprise 53.63 08/05/2022 72 01/07/2024
38 GDP-3/ NA-70 Improvement of Rustampur-Mir Kundi Road by RCC at Ch. 360m-2230m under Upazila: Bandar District: Narayanganj Road ID No. 367064036 Salvage Cost Tk. 3,14,689.00 Package no: GDP-3/ NA-70 GDP-3 bandar 1.87 338.56 M/S Mominul Hoque and M/S SIAM CORPORATION JV 307.80 100 03/03/2024
39 GDP-3/NA-54 Constuction of 18.00m Long RCC Girder Bridge on Malibag High School to Baligaon Road at Ch 20m under Upazila : Bandar, District: Narayanganj Road ID No. 367064014 Package no: GDP-3/NA-54 GDP-3 bandar 18.00 149.95 Orient Trade International, 17/18, Akhoy Das Lane, Gandaria, Sutrapur, Dhaka-1204 179.92 25/07/2022 31/07/2022 31/01/2024 100 04/09/2023
40 GDP-3/ NA-47 1. a) Improvement of Kamtal Madrasha-Brahammaputra river via H/O Sokina Member Road at Ch. 00-605m under Upazila: Bandar District: Narayanganj Road ID No. 36706407. Salvage Cost: 63,552.00 b) Improvement of Madanpur Madanganj R&H- Ananda Nagar Road at Ch. 00-635m under Upazila: Bandar District: Narayanganj Road ID No. 367065048. Salvage Cost: 3,46,718.00 c) Improvement of Jangul-Kumrabo Road at Ch. 00-500m under Upazila: Bandar District: Narayanganj Road ID No. 367064049 Package no: GDP-3/ NA-47 GDP-3 bandar 1.74 157.16 M/S Asif & Brothers, 157.12 100 53.43 01/08/2023
41 GDP-3/NA-87 Constuction of 2x5.00m x 3.00m RCC Box Culvert on Kushiara-Dashergaon R&H Road at Ch 5.00m under Upazila : Bandar, District: Narayanganj Road ID No. 367064027 Package no: GDP-3/NA-87 GDP-3 bandar 10.00 54.45 M/S Hazi Yunus Enterprise, 51.73 19/05/2022 25/05/2022 24/05/2023 100 01/08/2023
42 GDP-3/NA-53 Construction of 15.00m Long RCC Girder bridge on Jungle-Kandapara Hazradi Road at ch.700m under Upazila: Bandar District: Narayanganj Road ID No. 367064007 Package no: GDP-3/NA-53 GDP-3 bandar 15.00 124.95 M/S Zihad Enterprise, Prop: Md. Zakir Hossain, Farazikanda, Modanganj, Bandar, Naraynganj. 124.95 100 98.52 05/07/2023
43 GDP-3/NA-57 a. Improvement of Adampur Bridge-Alauddin(Akiluddin) bari Road by BC at Ch. 00-375m under Upazila: Bandar District: Narayanganj Road ID No. 367065147. b.Improvement of Zeodhara-(Shelsardi)- Digaldi Primary School Road by BC at Ch. 00-510m. under Upazila: Bandar District: Narayanganj Road ID No. 367065020. Salvage Cost Tk. 45,798.00 Package no: GDP-3/NA-57 GDP-3 bandar 0.89 92.27 M/S Kazi Enterprise, Prop: Kazi Masud, Golnagar, Olipura bazar, Sonargaon, Narayanganj 87.66 60 30/03/2023
44 GDP-3/NA-58 Improvement of Salserdi GPS-Sabdi bazar main Road by BC at Ch. 00-675m under Upazila: Bandar District: Narayanganj Road ID No.367065108 (367065107). Salvage Cost Tk. 1,73,644.00 Package no: GDP-3/NA-58 GDP-3 bandar 0.68 65.68 M/S Kazi Enterprise, Prop: Kazi Masud, Golnagar, Olipura bazar, Sonargaon, Narayanganj. 62.39 100 05/12/2022
45 GDP-3/NA-67 Improvement of UZ H/Q-Sabdi Bazar Road (Kollandi Bazar RHD –Sathi Bazar) By RCC at Ch. 1257-2000m under Upazila: Bandar, District: Narayanganj Road ID No. 367062004. Salvage Cost Tk. 1,07,209.00 Package no: GDP-3/NA-67 GDP-3 bandar 0.74 189.87 Aristocratic Construction Firm, Mouchak, Sanarpar, Siddirganj, Narayanganj 206.00 28/06/2022 05/07/2022 02/01/2024 100 8.00 04/10/2022
46 GDP-3/NA-55 Construction of 28.00m Long RCC Girder bridge on Chanpur Bigghan parished-Kalabag Road at ch.400m under Upazila: Bandar District: Narayanganj Road ID No. 367065038 Package no: GDP-3/NA-55 GDP-3 bandar 28.00 165.47 Nannu-Hasib JV, Bagori, Sonargaon, Narayanganj. 165.37 100 29/08/2022
47 GDP-3/ NA-40 1.a) Improvement of Adampur Pagla bari- Kallayandi Main Road from Ch: 00m-805.00m under Bandar Upazila District: Narayanganj. Road ID No: 367065146. Salvage Cost: 1,30,370.00 b)Improvement of Kandipara pacca Bridge -Hazradi Road from Ch: 600.00m-1150.00m under Bandar Upazila District: Narayanganj. Road ID No: 367064028. Salvage Cost: 2,09,736.00 c) Improvement of Hazi Saleque Bridge – Mohanpur Graveyard Road from Ch: 00m-300.00m under Bandar Upazila District: Narayanganj. Road ID No: 367065031. d)Improvement of Burandhi Moslauddin Memberbari-Kuria vita via Narpadi Road from Ch: 00.00m-550.00m under Bandar Upazila District: Narayanganj. Road ID No: 367065144. Salvage Cost: 1,60,536.00 e) Improvement of Burandhi Nurul Huda bari- Kandhipar Narpadi via Uttarpara Mosque Road form Ch: 00m-734.00m under Bandar Upazila District: Narayanganj. Road ID No: 367065143. Salvage Cost: 9,04,485.00 f) Improvement of Lausher H/O Sukkur Ali-Lausher Registered Primari School Road form Ch: 00.00m-318.00m under Bandar Upazila District: Narayanganj. Road ID No: 367065074. Salvage Cost: 1,33,453.00 g) Improvement of Madanpur Madrasha - Dewanbag H/O Shoban Mia Road form Ch: 00m-335.00m under Bandar Upazila District: Narayanganj. Road ID No: 367065036. Package no: GDP-3/ NA-40 GDP-3 bandar 3.59 335.92 M/S Ahsan Enterprise, 351.18 100 303.56 19/06/2022
48 GDP-3/NA-60 Improvement of Kuripara Bat Tala to Amior Bat Tala Road by BC at Ch. 00-500m under Upazila: Bandar District: Narayanganj Road ID No. 367065103. Salvage Cost Tk. 1,37,441.00 Package no: GDP-3/NA-60 GDP-3 bandar 0.50 51.67 M/S Kazi Enterprise, Prop: Kazi Masud, Golnagar, Olipura bazar, Sonargaon, Narayanganj. 49.09 100 01/06/2021
49 GDP-3/NA-46 1. a) Improvement of Kushiara – Dashergaon R&H Road at Ch. 00-660m under Upazila: Bandar District: Narayanganj Road ID No. 367064027. b) Improvement of Madanpur R&H-Changain Road at Ch. 00-262m under Upazila: Bandar District: Narayanganj Road ID No. 367064012. Salvage Cost Tk. 47,167.00 Package no: GDP-3/NA-46 GDP-3 bandar 0.92 92.28 M/S Prodhan Construction, Prop: Abul Hasnat Sohan, 2 No. Madhabpasa, Madanganj, Bandar, Naraynganj. 92.28 100 11/04/2021
50 GDP-3/NA-48 2. Improvement of Padugar-Kulcharitra Road at Ch. 00-760m under Upazila: Bandar District: Narayanganj Road ID No. 367064015. Salvage Cost Tk. 3,91,631.00 Package no: GDP-3/NA-48 GDP-3 bandar 0.76 73.67 M/S Prodhan Construction 73.67 100 03/03/2021
51 GDP-3/ NA-13 a) Improvement of Musapur RHD Pacca Road - H/O Ataulla Via Musapur Primary School Road from Ch.00m-730m (ID No.367065065), b) Improvement of Jungal to Kandapara Road from Ch. 1350m-1950m. ( ID No. 367064007), c) Improvement of Bandar Shahi Mosque-Kalaba GDP-3 bandar 2.36 233.47 M/S Ahasan Enterprise 233.47 100 10/08/2020
52 GDP-3/ NA-14 a)Improvement of Aaistala Kalabag Bridge - Uttar Sabdhi Main Road from Ch. 00m-636m (ID No.367065106), b) Improvement of Lousher Road-kainal vita Graveyeard Road from Ch. 00m-1330m, Construction of Double Vent (2x900mm) Pipe Culvert on Lousher road-kainal GDP-3 bandar 2.66 248.04 M/S Ahasan Enterprise 248.04 100 03/06/2020
53 GDP-3/NA-99 Improvement of Bhuighar Canalpar Pucca Road to Adrosha Nagar Chowrasta Road from Ch. 00m-810m & Connecting 110m by RCC (Road ID-367585427) under Upazila: Sadar, District: Narayanganj. GDP-3 narayanganj-s 0.81 8.00 262.43 M/S Akbar Construction 146.26 06/03/2022 65 02/09/2024
54 Package no: GDP-3/NA-93 Improvement of House of Ismail Bhuyan Paper Mill up to DN link Road by RCC by Ch. 0.00m-665.00m (Road ID No. 367584023) under Upazila: Sadar, District: Narayanganj). Package no: GDP-3/NA-93 GDP-3 narayanganj-s 0.67 126.92 M/S A. N. Corporation 133.25 75 02/09/2024
55 Package no: GDP-3/NA-91 Improvement of Adarsha Nagar to Dalutpur join Road by RCC at Ch. 0.00m-517.00m (Road ID No. 367585052) under Upazila: Sadar, District: Narayanganj. Package no: GDP-3/NA-91 GDP-3 narayanganj-s 0.52 101.77 M/S S Haque Construction 106.85 100 03/03/2024
56 GDP-3/NA-89 Improvement of 3 No. Nur Mosque to azmiribug (Fatullah) Road by RCC at Ch. 0.00m-335.00m (Road ID No. 367585402) [Salvage cost Tk. 7,66,437.00] under Upazila: Sadar, District: Narayanganj. Package no: GDP-3/NA-89 GDP-3 narayanganj-s 0.34 76.51 M/S Atif Enterprise 80.26 18/04/2023 25/04/2023 100 03/03/2024
57 Package no: GDP-3/NA-90 Improvement of koraitola Bus stand-H/O Rahmat Road by RCC at Ch. 0.00m-620.00m (Road ID No. 367585222) under Upazila: Sadar, District: Narayanganj. Package no: GDP-3/NA-90 GDP-3 narayanganj-s 0.62 127.18 AEIMCO INTERNATIONAL 132.91 04/10/2023 100 04/09/2023
58 Package no: GDP-3/NA-92 Improvement of kutubpur union Santidhara link road to Anwar member house Road by RCC at Ch. 0.00m-375.00m (Road ID No. 367585319) under Upazila: Sadar, District: Narayanganj. Package no: GDP-3/NA-92 GDP-3 narayanganj-s 0.38 71.26 S.A. Trade & Syndicate 74.83 100 04/09/2023
59 GDP-3/NA-77 Improvement of Kutubpur west Rasulpur Railline- Alakchan BB Madrasha Road by RCC at Ch. 0.00-600.00m under Upazila: Sadar District: Narayanganj Road ID No. 367585206 Package no: GDP-3/NA-77 GDP-3 narayanganj-s 0.60 110.17 M/S S Haque Construction 110.17 100 30.00 04/10/2022
60 GDP-3/NA-75 Improvement of Kutubpur union Santidhara link road to Anwar Member house Road by RCC at Ch. 0.00-375.00m under Upazila: Sadar District: Narayanganj Road ID No. 367585319 Package no: GDP-3/NA-75 GDP-3 narayanganj-s 0.38 66.40 M/S Real Enterprise 63.08 0 19/06/2022
61 GDP-3/NA-76 Improvement of House of Ismail Bhuyan Paper Mill up to DN link Road by RCC at Ch. 0.00-665.00m under Upazila: Sadar District: Narayanganj Road ID No. 367584023 Package no: GDP-3/NA-76 GDP-3 narayanganj-s 0.67 121.23 M/S Real Enterprise 115.16 0 19/06/2022
62 GDP-3/ NA-29 4.a) Improvement of Pagla Moddha Rasulpur A.K.M. Shamshujjoha Road from Ch. 000m-1000m by RCC ( Road ID No.367585465), b) Improvement of Panchobati Koloni to Shah Fateullah Railgate Road from Ch. 000m-253m ( Road ID No.367585472), c) Improvement of Gog GDP-3 narayanganj-s 2.17 251.75 M/S Ahasan Enterprise 251.75 100 01/06/2021
63 GDP-3/ NA-11 a) Improvement of Talla D Capital Print-Noborobi Clab Road at Ch. 000-455m (Road ID 367585084), b) Improvement of Fatullah RHD-Rail Crossing-Jalkuri RHD Road at Ch. 2475-3420m by RCC (Road ID 367584096) under Upazila: Sadar, District: Narayanganj. GDP-3 narayanganj-s 1.40 149.52 M/S A. N. Corporation 149.51 10/10/2018 09/04/2019 100 03/12/2020
64 GDP-3/ NA-27 2.a) Improvement of Kayempur Old Jamme Mosque to Pitali Pool Road from Ch. 000m-290m ( Road ID No.367585475), b) Improvement of Kayempur WAPDA Pool- Kutubpur Club to Kutubpur Pry. School Road from Ch. 000m-365m ( Road ID No.367585477), c) Improvement of GDP-3 narayanganj-s 1.66 128.82 M/S Akbar Construction 128.82 100 03/12/2020
65 GDP-3/ NA-26 .a) Improvement of Gosherbug Jamal Garrage to H/O Nazrul Road from Ch.000-580m ( Road ID No.367585469), b)Improvement of Pagla Moddah Rasulpur H/O Motaleb Kha to H/O Majib Kha Road from Ch. 000m-275m ( Road ID No.367585406), c) Improvement of Mamudpur K GDP-3 narayanganj-s 2.81 193.99 M/S Akbar Construction 193.99 100 04/11/2020
66 GDP-3/ NA-28 3.a) Improvement of Enayetnagar UP Office(Panchaboti)-Mazdair Kabarstan bazar Road from Ch.1355-2480m ( Road ID No.367583001), b) Improvement of Islambag-WAPDA Pool Road from Ch. 000m-355m ( Road ID No.367584075), c) Improvement of Uttor Gopalnagar River GDP-3 narayanganj-s 2.65 284.45 M/S Ripa Construction & M/S Asib Enterprise (JV) 284.43 100 03/06/2020
67 GDP-3/ NA-30 .a) Improvement of Moddhonagar Rajnagar H/O Sattar Mia to Bhandari Char Moddhonagar Road from Ch. 000m-670m ( Road ID No.367585449), b) Improvement of Pagla Rail line Side to Dhaka Munshiganj Road from Ch. 000m-810m ( Road ID No.367585464), c) Improvem GDP-3 narayanganj-s 2.07 152.63 M/S Akbar Construction 152.63 100 10/02/2020
68 GDP-3/ NA-21 a) Improvement of Dharmaganj Kheyaghat to Maddhya Naga Road from Ch.1000-1569m Under Sadar Upazila, District: Narayanganj (ID No: 367584033), b) Improvement of Abdul Samad Hazi Khamar - Mahmudpur Karim Market Road from Ch. 00m-685m Under Sadar Upazila, Di GDP-3 narayanganj-s 2.50 218.91 M/S Ahasan Enterprise 205.99 100 08/01/2020
69 GDP-3/ NA-16 Improvement of Shashongaon R&H-Baktabali GC-Taltola GC Road from Ch.4000m-6000m by RCC. (ID No.367582003) GDP-3 narayanganj-s 20.00 397.46 M/S S. R. Enterprise 397.44 100 05/12/2019
70 GDP-3/ NA-18 a) Improvement of Baktaboli UP office - Prashannonagar ( Radanagar)Road from Ch. 1227m-2608m (ID No. 367585095), b)Improvement of Shashongaon Boktaboli GCCR- Laxminagar Madrasha to Moddhanagar Rajnagar Road from Ch. 00m-1100m.(ID No.367585405) GDP-3 narayanganj-s 2.48 183.91 M/S S. R. Enterprise 183.91 18/11/2018 17/11/2019 100 05/11/2019
71 GDP-3/NA-Reh-45 Rehabilitation of Nalua – Farazikanda - Paikpara road. at Ch. 00-420m. under Sadar Upazila, Dist.: Narayanganj. Road ID No. 367584083. Salvage Cost Tk. 57,626.00, Package no: GDP-3/NA-Reh-45 GDP-3 narayanganj-s 0.42 69.28 M/S A.N Corporation, 69.28 100 05/11/2019
72 GDP-3/ NA-39 2. a) Improvement of Pagla-Noyamati Hazi Amir Ali Road at Ch. 00-470m (Road ID: 367585433) , b) Improvement of Volail bridge to Tower Road at Ch. 00-1150m (Road ID: 367585434), c) Improvement of Masdair Siam Garments-Ponchoboti Colony Road (Dormagonj Khea GDP-3 narayanganj-s 2.17 156.69 M/S Akbar Construction Prop: Md. Ali Akbar, 72/2, North Chasara, Narayanganj 156.69 100 09/10/2019
73 GDP-3/ NA-7 Improvement of Masdair DN to R & H Road by RCC from Ch.349m-395m & Ch. 495m-958m (Road ID-367584125), 2)Improvement of Kutubpur Bhuigar Shamshuzzoha Road by RCC from Ch.000m-1025m (Road ID-367584068, 3)Improvement of Bhuighar DN Link Road - Rupayan Housin GDP-3 narayanganj-s 2.99 463.55 M/S Ahasan Enterprise 463.38 02/10/2018 01/10/2019 100 05/10/2019
74 GDP-3/ NA-10 Improvement of Kutubpur UP Office (Tatkhana) to Dhaka-Narayanganj link Road via Bhuighar Bus-Stand Bazar Road by RCC at Ch. 000-3710m (Road ID-367583004) under Upazlia: Sadar, District: Narayanganj. GDP-3 narayanganj-s 3.71 905.34 M/S Ahasan Enterprise 905.21 02/10/2018 01/10/2019 100 08/07/2019
75 GDP-3/ NA-12 a) Improvement of Mizmizi-Bhuighar-Roughunathpur Road at Ch. 2540-3500m by RCC (Road ID 367584106), b) Improvement of Kaium old Jamme Mosque to New Jailkhana Road at Ch. 575-940m by RCC (Road ID 367584046), c) Improvement of Ragunathpur link Road to Hossa GDP-3 narayanganj-s 1.70 206.51 M/S Ahasan Enterprise 206.50 26/11/2018 25/11/2019 100 08/07/2019
76 GDP-3/ NA-15 Improvement of Fatulla post office R&H-Hazigonj R&H Road via Upazila H/Q Road from Ch. 2170m-4260m by RCC.(ID No.367582002) GDP-3 narayanganj-s 2.09 387.55 M/S S. R. Enterprise 387.47 20/11/2018 19/05/2019 100 08/07/2019
77 GDP-3/ NA-17 a) Improvement of Isdair bazar Gabtali via Uttar Masdair(Pilkhana) Road from Ch. 00m-660m by RCC (ID No. 367584067), b) Improvement of Hazipara culvert to Gaddar bazar road via Nur Nagar Road from Ch. 00m-1032m by RCC .(ID No.367585412) GDP-3 narayanganj-s 16.92 225.30 M/S Akbar Construction 225.29 100 08/07/2019
78 GDP-3/ NA-38 1. a) Improvement of Pilkuni Bhasha Sainik Nagina Joha Road at Ch. 00-805m by RCC (Road ID: 367585473) b) Improvement of Saddam market to Bhuigoar Graveyeard via Delpara Khalpar Road at Ch. 00-1080m by RCC (Road ID: 367585462) , c) Improvement of Dapa Uk GDP-3 narayanganj-s 2.27 349.97 M/s Ahsan Enterprise, 60, Shahsuja Road , Paikpara, Narayanganj 349.85 100 08/07/2019
79 GDP-3/ NA-20 Improvement of Baktabali UP Office-DecreercharBazar Road by RCC at Ch. 995-1567m Under Sadar Upazila, District: Narayanganj (ID No: 367583008) GDP-3 narayanganj-s 0.61 73.88 M/S S. R. Enterprise 73.88 18/12/2018 100 09/06/2019
80 GDP-3/ NA-1 Improvement of Baburail Bangla bazar to Kashipur UP Office (R&H) Road (Road ID-367583006) from Ch: 00m-1124m by RCC under Upazila: Sadar, District: Narayanganj. GDP-3 narayanganj-s 1.14 136.01 M/S A.N Corporation 136.01 14/05/2018 13/05/2019 100  
81 GDP-3/ NA-2 Improvement of Delpara Road Bhuighar (Dhaka Narayanganj Link Road) Road from Ch: 00m-1690m by RCC (Road ID-367584058) under Upazila: Sadar, District: Narayanganj. GDP-3 narayanganj-s 1.69 205.77 M/S S.R Enterprise 205.77 15/05/2019 100  
82 GDP-3/ NA-3 Improvement of Shadu Madbar Road from Ch: 00m-1505m by RCC (Road ID-367584090) under Upazila: Sadar, District: Narayanganj. GDP-3 narayanganj-s 1.50 180.05 M/S A.N Corporation 180.05 26/05/2018 25/05/2019 100  
83 GDP-3/ NA-4 Improvement of Kutubpur Bhuighar Shamshuzzoha Road from Ch: 00m-1500m by RCC (Road ID-367585443) under Upazila: Sadar, District: Narayanganj. GDP-3 narayanganj-s 1.50 194.25 M/S S.R Enterprise 194.25 16/05/2018 15/05/2019 0  
84 GDP-3/ NA-5 Improvement of Aligonj to Dhaka-Narayanganj Rail Line Road from Ch: 00m-1000m by RCC (Road ID-367585055) under Upazila: Sadar, District: Narayanganj. GDP-3 narayanganj-s 1.00 121.30 M/S A.S.B Enterprise 121.30 26/05/2018 25/05/2019 100  
85 GDP-3/ NA-6 Improvement of Bhuighar Canalpar Pucca Road to Adrosha Nagar Chowrasta Road from Ch. 00m-810m by RCC (Road ID-367585427) under Upazila: Sadar, District: Narayanganj. GDP-3 narayanganj-s 0.81 52.58 M/S S.R Enterprise 52.58 16/05/2018 15/11/2018 0  
86 GDP-3/NA-100 Construction of RCC Drain on Demra Kaligonj Road Liton Member Bari - Jangir Konapara via Kudur Market Road at Ch.00m-515m. (Road ID No. 367685461) under Upazila: Rupganj, District: Narayanganj GDP-3 rupganj 515.00 90.11 M/S Samiya Enterprise 85.61 27/12/2023 100 02/09/2024
87 GDP-3/NA-88 Constuction of 22m RCC Inverted Girder Bridge on Golakandail Dorikandi Mouza Road at Ch 1052m under Upazila : Rupganj, District: Narayanganj Road ID No. 367683011. Package no: GDP-3/NA-88 GDP-3 rupganj 22.00 235.75 Samrat Enterprise 230.00 15/12/2022 18/12/2022 09/06/2024 100 01/07/2024
88 GDP-3/ NA-71 Improvement of Demara Kaligonj Road Liton Member Bari- Zangir Konapara Via Kudur Market Road by RCC at Ch. 0.00-600m under Upazila: Rupganj District: Narayanganj Road ID No. 367685461. Package no: GDP-3/ NA-71 GDP-3 rupganj 0.60 187.87 M/S E.M TRADERS 178.48 100 05/07/2023
89 Package no: GDP-3/NA-84 Improvement of Chanpar Punorbashon Centre Word No-9 Minto Bari Hotel – Ward no-8 Somoddur Bari Road By RCC at Ch. 00-190m under Upazila: Rupganj, District: Narayanganj Road ID No. 367685486. Package no: GDP-3/NA-84 GDP-3 rupganj 0.19 59.29 M/S Rakib Enterprise 56.33 04/03/2022 04/10/2022 04/10/2023 100 07/05/2023
90 GDP-3/NA-83 Improvement of Chanpar Punorbashon Centre Word No-8 Taru Mia Bari To Sultan shop Road By RCC at Ch. 00-149m under Upazila: Rupganj, District: Narayanganj Road ID No. 367685485 Package no: GDP-3/NA-83 GDP-3 rupganj 0.15 43.82 M/S. SOHANA ENTERPRISE, 41.63 27/03/2022 03/04/2022 03/04/2023 100 31/10/2022
91 GDP-3/NA-68 Improvement of Tangrartead to Kali (Kali BC Road To Tangrarteak Jame Mosque) Road by RCC at Ch. 0.00-740m under Upazila: Rupganj District: Narayanganj Road ID No. 367685202. Salvage Cost Tk. 1,26,164.00 Package no: GDP-3/NA-68 GDP-3 rupganj 0.74 138.28 A. R TRADING CONSTRUCTION 131.36 100 28/06/2022
92 GDP-3/NA-Market-69 Improvement of Murapara Growth Center under Upazila: Rupganj, District: Narayanganj. Package no: GDP-3/NA-Market-69 GDP-3 rupganj 16.12 M/S CHOWDHURY BUILDERS, 15.31 100 1459637.00 27/06/2022
93 GDP-3/NA-50 1. Improvement of Mazina to Mailabo ( Maileb) by BC Road at Ch. 00-850m under Upazila: Rupganj District: Narayanganj Road ID No. 367685244 2. Improvement of Boruna Primary School - Dattabari Road by BC at Ch. 00-280m under Upazila: Rupganj District: Narayanganj Road ID No. 367685247 Package no: GDP-3/NA-50 GDP-3 rupganj 1.13 95.92 M/S Rafida Enterprise, Prop: Sayed Asfaquz Zaman Robal, Mahmudabad, Murapara, Rupganj, Narayanganj. 91.12 100 06/10/2021
94 GDP-3/NA-61 Improvement of Boruna Bazar to Basulia via Futatali by RCC Road at Ch. 00-935m under Upazila: Rupganj District: Narayanganj Road ID No. 367685246 Package no: GDP-3/NA-61 GDP-3 rupganj 0.94 176.25 M/s Rakib Enterprise - M/s Habib Enterprise JV, Murapara, Rupganj, Nanayanganj. 176.20 100 26/08/2021
95 GDP-3/ NA-33 a) Improvement of Hankur-Madhabpur Mosque to Parartek Pacca Road at Ch. 00-700m (Road ID: 367685406), b) Improvement of Takmanikpur to Hankor-Madhobpur Road at Ch. 00-810m (Road ID: 367685057), c) Improvement of Beldi GC Road Hira Market to Vaoal Shimolia GDP-3 rupganj 1.83 142.47 M/S concord Enterprise 133.38 100 11/04/2021
96 GDP-3/ NA-35 a) Improvement of Taora Kurdi bari to Danga Pasdona Road at Ch. 00m-570m (Road ID: 367685138), b) Improvement of Agla Mahabub’s Shop to Beribadh to Agla Pry school, Agla Mosque Road at Ch. 00-640m (Road ID: 367685275), c) Improvement of Hirnal Vagboti Kha GDP-3 rupganj 2.88 211.49 RE-MRC JV 211.14 100 11/04/2021
97 GDP-3/NA(Market)-62 Rehabilitation of Porshi Bazar under Upazila: Rupganj, District: Narayanganj. Package no:GDP-3/NA(Market)-62 GDP-3 rupganj 15.00 M/S ASHIF ENTERPRISE 14.25 100 03/12/2020
98 GDP-3/ NA-32 a) Improvement of Kuliadi Pacca Road to Kagirbag Pacca Road at Ch. 00-1360m (Road ID: 367685414), b) Improvement of Potina Bazar to Agla Beri Bandth Road at Ch. 00-1425m (Road ID: 367684072) under Upazila: Rupganj, District: Narayanganj. GDP-3 rupganj 2.79 219.63 RE-MRC JV 219.47 100 05/10/2020
99 GDP-3/ NA-34 a) Improvement of Madhobpur jakir's house to Nondibari Bridge via Tofazzol Chairman & Hankur Primary School Road at Ch. 00-1400m (Road ID: 367685407), b) Improvement of Bagla Ali Hossen’s Shop to Beribadh to Mostafa's House Road at Ch. 00-2700m (Road ID: GDP-3 rupganj 4.10 294.39 RE-MRC JV 293.91 100 10/08/2020
100 Package No: GDP-3/NA-41 1. a) Gandhorbpur-Kornogop Rafique House - east nogor Jame Mosque (Rafique House at Gondhorbpur-Kornogop Road To east nogor Jame Mosque) by RCC Road from Ch. 00-1035.00m. Under Rupganj Upazila District: Narayanganj. Road ID No: 367685393 (367685401). b) Improvement of Dohorgaon BC road to Sasankhola Road from Ch. 00m-800m. Under Rupganj Upazila District: Narayanganj. Road ID No: 367685168. Salvage cost Tk. 27,54,568.00 c) Improvement of Paragao Eidga to the H/O Nabi Hossain bari Road from Ch.00m-750m. Under Rupganj Upazila District: Narayanganj. Road ID No: 367685183. Salvage cost Tk. 4,14,790.00 Package No: GDP-3/NA-41 GDP-3 rupganj 2.59 292.55 Habib Enterprise-Asif & Brothers JV 292.49 100 08/07/2020
101 GDP-3/ NA-31 a) Improvement of Dighi Barabo Pappur House to Eng. Munir House Road at Ch. 00-780m by BC (Road ID: 367685405) [Salvaged materials cost Tk. 3,38,584.00], b) Improvement of Salam Member House to Labrapara Road at Ch. 00-480m by BC (Road ID: 367685229), c) GDP-3 rupganj 3.00 324.59 M/S Asif & Brothers 324.58 100 03/06/2020
102 GDP-3/ NA-8 1.a) Improvement of Masumabad-Dighirpar Road from Ch.00m-600m by BC (Road ID-367685178), b)Improvement of Gondhorbpur Hazi bari to Boro Mosque via Prymary School Road ( Gondhorbpur Taltola to Gondhorbpur Boro Mosque) from Ch. 00m-566m by RCC (Road ID-36 GDP-3 rupganj 1.17 115.93 M/S A S Mollah Trading 110.13 06/10/2018 05/04/2019 100 10/06/2019
103 GDP-3/ NA-9 Improvement of Borpa-Mohazompur Road to Bagan bari Mosque Road (Borpa-Mohazompur Road to H/o A.Aziz Road) from Ch. 00m-1068m by RCC & BC (Road ID-367685115 , under Upazila: Rupganj, District: Narayanganj. GDP-3 rupganj 1.07 90.31 M/S Asif & Brothers 85.80 07/10/2018 06/04/2019 100 07/03/2019  
104 GDP-3/NA-98 Improvement of Mirertek Bazar-jampur UP Office Road Ch.1760m-3760m (Road ID No. 367043001) under Upazila: Sonargaon, District: Narayanganj GDP-3 sonargaon 367043001 2.00 232.35 M/S Hasmat & Brothers 243.31 08/03/2022 35 02/09/2024
105 GDP-3/NA-95 Improvement of Fuldi Bagerpara Road (Barodi Annando Bazar GC Fuldi Via Hasem Chairman House) by BC at Ch.00m-1400m. (Road ID No. 367045022) under Upazila: Sonargaon, District: Narayanganj GDP-3 sonargaon 1.40 15.00 179.08 M/S Sabbir Corporation 170.12 06/03/2022 95 02/09/2024
106 GDP-3/NA-97 Improvement of Chotrapasha to WAPDA bundh Road Ch.00m-1810m (Road ID No. 367044057) [Salvage Cost Tk. 2061900.00] under Upazila: Sonargaon, District: Narayanganj GDP-3 sonargaon 1.81 187.92 M/S Anik Enterprise 178.52 08/03/2022 40 01/07/2024
107 GDP-3/NA-96 Improvement of Pirojpur UP Office-Battala Baza Road from Ch.752m-1722m (Road ID No. 367043004) under Upazila: Sonargaon, District: Narayanganj GDP-3 sonargaon 0.97 126.26 M/S J.M Enterprise 119.95 70 01/07/2024
108 GDP-3/NA-102 (Remaining) Remaining Work of Uazila H/Q- Panchamighat GC via Adampur Pramer Bazar Sonmandi Road at ch 6337-9640m under Upazila Sonargaon Dist Narayangan Road ID-367042009) GDP-3 sonargaon 367042009 1.60 207.78 M/S Shamim Enterprise 192.26 78 01/07/2024
109 GDP-3/NA-85 Improvement of BSIC Pucca Road to Kutubpur Madrasa Road By RCC at Ch. 00-680m under Upazila: Sonargaon, District: Narayanganj Road ID No. 367044055 Package no: GDP-3/NA-85 GDP-3 sonargaon 0.68 148.89 M/S Nadim Enterprise, Prop: Rafiqul Islam Nannu, Gohatta, Baro nagar, Sonargaon, Narayanganj. 141.44 16/05/2022 24/05/2022 23/05/2023 100 26/09/2023
110 Package no: GDP-3/NA-80 Improvement of Ramgobidergaon – Kikertek Hat via Mogarchar Road by RCC at Ch. 998-1532.00m under Upazila: Sonargaon, District: Narayanganj Road ID No. 367044025. Salvage Cost Tk. 2,79,449.00 Package no: GDP-3/NA-80 GDP-3 sonargaon 534.00 128.87 M/S Nadim Enterprise, 122.43 07/03/2022 14/03/2022 06/05/2023 100 04/09/2023
111 GDP-3/NA-86 Improvement of R&H to Katchpur UP Office road Via Padma Metal and Katchpur Uttarpara road by RCC at Ch. 00-738m under Upazila: Sonargaon, District: Narayanganj Road ID No. 367044049 Salvage Cost: 2,11,319.00 Package no: GDP-3/NA-86 GDP-3 sonargaon 0.74 143.69 M/S Monir Traders 136.51 06/06/2022 14/06/2022 13/06/2023 100 23/05/2023
112 GDP-3/ NA-37 a) Improvement of Amgaon Majherchar via omma (Ambag-Majherchar via Ottma) Road at Ch. 00-2221m (Road ID: 367044022) [Salvaged materials cost. Tk. 9,91,676.00], b) Improvement of Amgaon Majherchar via omma (Ambag-Majherchar via Ottma) Road at Ch. 2240-3874 GDP-3 sonargaon 3.86 266.56 M/S S. Sarker Enterprise 249.77 45 04/10/2022
113 GDP-3/ NA-49 Improvement of Upazila H/Q-Panchamighat GC via Adampur Pramer Bazar Sonmandi Road at Ch. 6337-9640m under Upazila: Sonargaon, District: Narayanganj, Road ID No. 367042009. Salvage Cost: 11,89,692.00 Package no: GDP-3/ NA-49 GDP-3 sonargaon 3.30 322.26 M/S S. Sarker Enterprise, Lotobdi, Sirajdikhan, Munshiganj. 299.92 55 29/08/2022
114 GDP-3/NA-63 Improvement of Pramer Bazar-Bangla Bazar Road at Ch. 00-1750m under Upazila: Sonargaon District: Narayanganj Road ID No. 367044008. Package no:GDP-3/NA-63 GDP-3 sonargaon 1.75 142.98 Messrs Razu and Raquib Enterprise, 135.83 100 03/01/2022
115 GDP-3/NA- 43 Constuction of 37m Long RCC Girder Bridge at Ch.3+758km. from Noyapur NHW-Gangapur GC Road under Upazila Sonargaon, District: Narayanganj Road ID no.367042005 Package no: GDP-3/NA- 43 GDP-3 sonargaon 37.00 273.47 Orient Trade International,17/18, Akhoy Das Lane, Gendaria, Dhaka-1204. 258.28 100 295.50 26/08/2021
116 GDP-3/NA-44 1. a) Constuction of 22m Long Inverted RCC Girder Bridge at Ch.2+870km. from Sonargaon Bazar(Panam)-Ananda Bazar GC via Hamsadi Road under Upazila Sonargaon, District: Narayanganj Road ID no.367043007 b) Constuction of 24m Long Inverted RCC Girder Bridge at Ch.4+300km. from Upazila H//Q to Panchamighat Road under Upazila Sonargaon, District: Narayanganj Road ID no.367042009 Package no: GDP-3/NA-44 GDP-3 sonargaon 22.00 332.27 Orient Trade International,17/18, Akhoy Das Lane, Gendaria, Dhaka-1204. 314.16 100 26/08/2021
117 GDP-3/NA-52 Improvement of Sonmandi UP Noakandi – West Sonmandi Old Zame Mosque via Kafaiakanda Road ( Darikandi Barodi Road at Noakandi- Kafaiakanda) at Ch. 00-1000m under Upazila: Sonargaon, District: Narayanganj Road ID No. 367045131(367044072) Package no: GDP-3/NA-52 GDP-3 sonargaon 1.00 78.41 M/S Nadim Enterprise, Pror: Rafiqul Islam Nannu, Gohatta, Baronagar, Sonargaon, Narayanganj. 74.49 100 26/08/2021
118 GDP-3/ NA-36 a) Improvement of Hamsadi-Premar Bazar Road (Hamsadi west para Bridge Hamsadi Madrasha) at Ch. 680-1366m Road ID: 367044028) b) Improvement of Batarkandi-Kuichamara Majer char Road at Ch. 00-1400m (Road ID: 367044015) under Upazila: Sonargaon, District: N GDP-3 sonargaon 2.09 130.64 M/S A.S.B Enterprise 124.11 100 04/11/2020
119 GDP-3/NA-59 Improvement of Katchpur-Changain Road by BC at Ch. 2130-3340m under Upazila: Sonargaon District: Narayanganj Road ID No. 367044003. Salvage Cost Tk. 22,07,323.00 Package no: GDP-3/NA-59 GDP-3 sonargaon 1.21 96.00 Aristocratic Construction Firm, Mouchak, Sanarpar, Siddirganj, Narayanganj 91.20 100 03/06/2020
120 GDP-iv/NAR/ RUP/WR-62 Development of Dhak abipass to golakandail notun bazar road by RCC (Ch. 0-790m) (Road ID 367684026) GDP-4 rupganj 367684026 0.79 100 124.47 M/S Rabby Enterprise 127.29 12/06/2019 18/06/2020 100 127.22 100 07/11/2022
121 GDP-iv/NAR/ RUP/WR-63 Development of vaola murapara vaola bazar road to aziz nagar bridge road (Ch. 0-950m) GDP-4 rupganj 367685398 0.95 100 135.20 Habib Enterprise-Asif& Brothers JV 135.15 01/07/2019 07/07/2020 100 135.15 100 07/11/2022
122 GSIDP/NRG/DW-5 Improvement of Girda South Para Zame Mosque. Union: Duptara, Latitude: 90.6014, Longitude: 23.7849 GSIDP araihazar 5.00 M/S Nazmul Enterprise 5.00 0  
123 GSIDP/NRG/DW-6 Improvement of Kumarpara Pathita Para Zame Mosque. Union: Duptara, Latitude: 90.610, Longitude: 23.803 GSIDP araihazar 4.99 M/S Nazmul Enterprise 4.99 0  
124 GSIDP/NRG/DW-7 Improvement of Hatkhola Para Edghah. Union: Duptara, Latitude: 90.602, Longitude: 23.801 GSIDP araihazar 15.95 M/S. Erik Enterprise 16.74 0  
125 GSIDP/NRG/DW-8 Improvement of Lokhkhibordi Eidgha. Union: Gopaldi, Latitude: 23.80507, Longitude: 90.70411 GSIDP araihazar 0.00 M/S Abul Traders 5.00 0  
126 GSIDP/NRG/DW-9 Improvement of Dhondi Eidgha. Union: Haijadi, Latitude: 23.7469, Longitude: 90.6288 GSIDP araihazar 0.00 M/S Masum Builders 10.50 0  
127 GSIDP/NRG/DW-10 Improvement of Bajbi Graveyerd. Union: Duptara, Latitude: 23.7961, Longitude: 90.5966 GSIDP araihazar 15.00 M/S Nazmul Enterprise 15.00 0  
128 GSIDP/NRG/DW-1 Improvement of Noni Sadur’s Ashram. Union: Dhamgar, Latitude: 23.66254, Longitude:90.57113 GSIDP bandar 9.07 M/S. Al-Mizan Construction and Supplliers 9.07 0  
129 GSIDP/NRG/DW-2 Improvement of Bandar Chowdhuri Bari Eidgah Math. Union: Bandar, Latitude: 23.61518, Longitude: 90.52618 GSIDP bandar 10.12 M/S Zihad Enterprise 10.12 0  
130 GSIDP/NRG/DW-3 Improvement of Lakshmon Khola Graveyard. Union: Mushapur, Latitude: 23.1494, Longitude: 90.53073 GSIDP bandar 15.95 M/S. Al-Mizan Construction and Supplliers 15.95 0  
131 GSIDP/NRG/DW-4 Improvement of Dakshin Char Gharmora Zam-E-Mosque. Union: Kalagachia, Latitude: 23.58451, Longitude: 90.52648 GSIDP bandar 15.02 M/S. J M Enterprise 15.02 0  
132 GSIDP/NRG/DW-11 Improvement of Hajrathpur Jangalshahee Jame Mosque. Union: Sonmandi, Latitude: 23.6736, Longitude: 90.58437 GSIDP sonargaon 8.00 M/S .A.S.B Enterprise.Pro-Ekramul Karim 7.60 0  
133 GSIDP/NRG/DW-12 Improvement of Habibpur Jame Mosque. Union: Mograpara, Latitude:23.6358, Longitude: 90.61472 GSIDP sonargaon 0.00 M/S .A.S.B Enterprise.Pro-Ekramul Karim 7.60 15/11/2018 100  
134 GSIDP/NRG/DW-13 Improvement of Nanakhi Moulabi Jame Mosque. Union: Sadipur, Latitude: 23.7116, Longitude: 90.5908 GSIDP sonargaon 5.31 M/S .A.S.B Enterprise.Pro-Ekramul Karim 5.04 0  
135 GSIDP/NRG/DW-14 Improvement of Ananda Bazar Baitul Karim Jame Mosque. Union: Baiddarbazar, Latitude: 23.6697, Longitude: 90.6358 GSIDP sonargaon 10.16 M/S .A.S.B Enterprise.Pro-Ekramul Karim 9.65 0  
136 GSIDP/NRG/DW-15 Improvement of Hossinpur Jame Mosque near Hossainpur School. Union: Shambupura, Latitude: 23.6405, Longitude: 90.5783 GSIDP sonargaon 5.67 M/S .A.S.B Enterprise.Pro-Ekramul Karim 5.39 0  
137 IRIDP-2/NRG/DW-12 Improvement of Puran Bandar Noor pur Pacca road - Vadrashan RHD Road from Ch. 00-1445m. IRIDP-2 bandar 1.40 129.04 M/S. Ahsan Enterprise 12.80 21/11/2016 31/05/2017 100  
138 IRIDP-2/NRG/DW-13 Improvement of Rustompur-Shelsardi Road from Ch.00-875m. IRIDP-2 bandar 0.87 82.76 M/S. Ahsan Enterprise 82.14 16/03/2016 23/03/2017 100  
139 IRIDP-2/NRG/DW-14 Improvement of Haluapara bazar-Langolbandh Road from Ch.00-1000m. IRIDP-2 bandar 1.00 107.80 M/S. Aristocatic Construction Firm 107.42 28/03/2016 10/08/2016 100  
140 IRIDP-2/NRG/DW-15 Improvement of Madanpur R&H-Madanpur H/O Kalai Hossain Road from Ch.00-600m. IRIDP-2 bandar 0.60 63.68 M/S Hasib Enterprise 63.62 15/03/2016 31/01/2017 100  
141 IRIDP-2/NRG/DW-1 IRIDP-2/NRG/DW-1 IRIDP-2 rupganj 0.30 22.73 M/S Dewan Trading 22.71 10/03/2016 22/02/2017 100  
142 IRIDP-2/NRG/DW-2 Improvement of Rupshi sluitch Gate-Kahina Road from Ch.600-885m. IRIDP-2 rupganj 0.28 29.08 M/S Rakib Enterprise 29.08 27/03/2016 29/05/2016 100  
143 IRIDP-2/NRG/DW-3 Improvement of Ropshi-Kanchon GC road (Rohima food mill) to Ropshi Bazar Road from Ch.00-275m. IRIDP-2 rupganj 0.27 37.07 M/S Asif & Brothers 37.03 14/03/2016 20/12/2018 45  
144 IRIDP-2/NRG/DW-4 Improvement of Rupshi-Kanchon GC to Dagarkhal via Karnogoup ,Gondrabpur Road from Ch.0.00-1000m. IRIDP-2 rupganj 1.00 57.78 M/S Rakib Enterprise 57.78 27/03/2016 30/07/2017 100  
145 IRIDP-2/NRG/DW-5 Improvement of Hatabo Abul Market to Enaet Market Road from Ch.800-1800m. IRIDP-2 rupganj 1.00 57.79 M/S Concord Enterprise 54.55 08/08/2016 19/09/2016 100  
146 IRIDP-2/NRG/DW-6 Improvement of Chanpara punorbasonkendra word no. 4 from Ch.00-384m. IRIDP-2 rupganj 0.38 27.28 M/S Progoti Traders 27.25 27/03/2016 30/06/2017 100  
147 IRIDP-2/NRG/DW-7 Improvement of Rupshi-KanchonGC road Sluice gate Kazi Rafiq house to Sohrab house via Graveyard, House of Ali Azgor Road from Ch.00-280m. IRIDP-2 rupganj 0.28 41.71 M/S Asif & Brothers 41.70 14/03/2016 15/05/2016 100  
148 IRIDP-2/NRG/DW-8 Improvement of Borpa Ahamed Re-Rolling Mill to Santi Nagar Zame Mosque Road from Ch.00-800m. IRIDP-2 rupganj 0.80 46.35 M/S Imtiaz Enterprise 46.31 13/03/2016 07/04/2016 100  
149 IRIDP-2/NRG/DW-9 Improvement of Barpa RHD - Sutolara Beribundh Road from Ch.2000m-2250m. IRIDP-2 rupganj 0.25 14.55 M/S A.S. Mollah Trading 14.49 15/03/2016 21/06/2016 100  
150 IRIDP-2/NRG/DW-10 Improvement of Khadun Haji Ayet Ali High School to Mograkul Road from Ch.700-1100. IRIDP-2 rupganj 0.40 56.26 M/S Asif & Brothers 56.19 29/02/2016 05/05/2016 100  
151 IRIDP-2/NRG/DW-11 Improvement of Anupam Garments to Majhipara(Dhaka-Sylhet RHD Aunopom Garments to Koirabo Mosque) Road from Ch.00-667m. IRIDP-2 rupganj 0.66 38.52 M/S Azmat trading 38.51 13/03/2016 30/04/2017 100  
152 LMAHBFP/WD-1 Construction of 1 No. RCC Nasim Osman Ghat at the West Bank of Brahammaputra River under Upazila: Bandar, District: Narayanganj. LMAHBFP bandar 1.00 60 10850000.00 M/S S R Enterprise 10847646.77 24/05/2018 30/05/2018 29/05/2019 60 5839930.00 60 29/08/2022 Ongoing
153 LMAHBFP/WD-2 Construction of 1 No. RCC Brishnupria Ghat at the West Bank of Brahammaputra River under Upazila: Bandar, District: Narayanganj. LMAHBFP bandar 100 108.50 M/S Ahasan Enterprise 108.45 24/05/2018 30/05/2018 30/06/2020 100 10727722.00 100 29/08/2022 Final
154 LMAHBFP/WD-3 Construction of 1 No. RCC Annapurna Ghat at the West Bank of Brahammaputra River under Upazila: Bandar, District: Narayanganj. LMAHBFP bandar 100 108.50 108.47646774 0.00 30/05/2018 29/05/2019 100 10288894.00 100 29/08/2022 Final
155 LMAHBFP/WD-4 Construction of 1 No. RCC Raj Ghat No.-1 at the West Bank of Brahammaputra River under Upazila: Bandar, District: Narayanganj. LMAHBFP bandar 108.50 108.45495731 0.00 30/05/2018 29/05/2019 55 3113461.00 29/08/2022 ongoing
156 LMAHBFP/WD-5 Construction of 1 No. RCC Raj Ghat No.-2 at the West Bank of Brahammaputra River under Upazila: Bandar, District: Narayanganj. LMAHBFP bandar 108.50 108.4783 0.00 05/09/2018 04/06/2019 55 3114257.00 29/08/2022 ongoing
157 LMAHBFP/WD-6