1
|
GCC2-01
|
Repairing & Widening of Road by BC from Vanuya to Banomala rail crossing via Joydebpur-Dhirasram, Haydarabad. (Ch-0+00 to Ch-15+259)
|
CGP
|
gazipur-s
|
|
15.26
|
|
|
3335.92
|
RAB-RC(pvt) Ltd & Dawn Corporation(JV)
|
3283.43
|
|
16/11/2017
|
10/11/2018
|
0
|
|
|
|
|
2
|
GCC2-02
|
a. Repairing & Widening of BC road from Maleker bari (Dhaka-Mymanshingh Highway) to Bashan sarak via Ojerpara & Haque Market. (Ch. 00+000 to 6+650 & a link Ch-0.0 to 0+763).
b. Construction of RCC drain along the side of Maleker bari raod (Dhaka-Mymanshingh Highway) to Bashan sarak via Ojerpara & Haque Market. (Ch.0.0 to -1+950),
|
CGP
|
gazipur-s
|
|
12.72
|
|
|
1972.08
|
CDC-NPL(JV)
|
1744.78
|
|
22/06/2017
|
28/08/2018
|
0
|
|
|
|
|
3
|
GCC2-03
|
Repairing & widening of Tongi Vadam road by RCC work (Ch-1+651 to Ch-4+150 & Link-1 road by BC ch-0+100 to Ch-0+950 & Link-2 road by RCC Ch-0+625)
|
CGP
|
gazipur-s
|
|
3.97
|
|
|
993.78
|
MRC-MKH (JV )
|
953.86
|
|
17/04/2017
|
11/04/2018
|
0
|
|
|
|
|
4
|
GCC2-05
|
a) Repairing & Widening of BC Road from Kashimpur to Sreepur connecting road (UP to Mother Textile). (RCC Road Ch. 0+000-4+500)(Link-1 BC Road Ch.0+380-1+277.7) and 530m link-2 RCC road with side drain (Engineer bari road starting from Gacha polasona main road) b) Construction of RCC drain at Kashimpur to Sreepur connecting road (Zitermoor to Mother textile) (Ch.0+000 to 4+500) & Link (Ch.0+000-
|
CGP
|
gazipur-s
|
|
11.82
|
|
|
2337.09
|
MKE-CDC-NPIL Jv
|
2123.94
|
|
29/11/2017
|
23/11/2018
|
0
|
|
|
|
|
5
|
GCC2-06
|
Repairing & Widening of Joybangla road by RCC/BC (Barobari to Maghdubi bypass via Akkas marker) including a Link Road L=8280m
|
CGP
|
gazipur-s
|
|
10.03
|
|
|
1434.04
|
Wahid Construction ltd
|
1349.78
|
|
18/05/2017
|
23/01/2019
|
0
|
|
|
|
|
6
|
GCC2-08
|
Repairing & Widening of BC Road from Shibbari Moor to Zoorpukur & Repairing and Widening of Road from Zoorpukur Moor to Titarkul. (Ch.0+045 to 3+625) & Repairing and widening of BC road from Surabari Rice mill to Kashimpur-Sreepur Road Kazi Market Mr.Malek House via Shaildubi Member Market. Ward No (04 & 05).
|
CGP
|
gazipur-s
|
|
6.75
|
|
|
1105.02
|
NT-MMB(JV)
|
994.51
|
|
31/01/2018
|
26/01/2019
|
0
|
|
|
|
|
7
|
GCC2-09
|
Repairing & Widening of BC road from Dhaka-Pubail road at Markun K2 factory to Harbaid Bazar via Maruka. (Ch. 0+00 to Ch-5+950)
|
CGP
|
gazipur-s
|
|
5.95
|
|
|
921.26
|
MAQ Engineering ltd.
|
882.83
|
|
30/03/2017
|
04/06/2018
|
0
|
|
|
|
|
8
|
GCC2-10
|
Repairing & widening of Khapara road (starting from Dhaka -Mymenshinhg road to Vadam road via Tilargati) (Ch-0+00 to Ch-3+810 ) By RCC Work
|
CGP
|
gazipur-s
|
|
4.36
|
|
|
1237.65
|
Wahid Construction ltd
|
1167.30
|
|
17/04/2017
|
22/12/2018
|
0
|
|
|
|
|
9
|
GCC2-12
|
Repairing & Widening of BC road from Nowzour to Zirani Bazar (starting from Zitermour to west direction up to 6.75. Km). (Ch. 0+00 to 6+750)
|
CGP
|
gazipur-s
|
|
6.75
|
|
|
1210.07
|
NT-RA(JV)
|
1062.33
|
|
14/05/2017
|
30/11/2018
|
0
|
|
|
|
|
10
|
GCC2-04
|
Construction of RCC Drain along side of Tongi Vadam road at Ch. 0+00 to Ch-4+125
|
CGP
|
gazipur-s
|
|
5.22
|
|
|
854.54
|
MRC-MKH(JV)
|
740.58
|
|
26/02/2017
|
21/04/2018
|
0
|
|
|
|
|
11
|
GCC2-07
|
Cosntruction of drain from Dhaka-Mymensingh highway to Dhaka bypass road via Gorib & Gorib factory & vogra bazar. (Ch. 00+00 to 1+400) b) Construction of drain from Mogorkhal to Kadda-Turag Khal along Dhaka By pass road Ch.0+0 to 3+950
|
CGP
|
gazipur-s
|
|
5.18
|
|
|
1500.77
|
MDJ Associates
|
1373.73
|
|
19/05/2017
|
25/06/2018
|
19
|
|
|
|
|
12
|
GCC2-11
|
Construction of RCC Drain along side of Khapara road lasr part (up to Tilargati road ) Ch. 1+375 to Ch-3+810
|
CGP
|
gazipur-s
|
|
3.19
|
|
|
643.76
|
MRC-MKH(JV)
|
575.00
|
|
26/02/2017
|
21/04/2018
|
0
|
|
|
|
|
13
|
GCC2-13
|
Construction of drain along the side of Nowzour to Zirani Bazar (starting from Zitermour to west direction up to 6.75 Km). (Ch. 00+000 to 6+750)
|
CGP
|
gazipur-s
|
|
6.75
|
|
|
1664.38
|
Wahid Construction ltd
|
1572.38
|
|
26/02/2017
|
14/09/2018
|
0
|
|
|
|
|
14
|
GCC2-14
|
Installation of 3 Nos Production Tube wells,Pump house,Necessary electrical work with 10.00km distribution pipe line at Zone-2,4 5 respectively
|
CGP
|
gazipur-s
|
|
|
|
|
1900.21
|
RFL Plastics Limited
|
1595.35
|
|
|
|
0
|
|
|
|
|
15
|
CIB-Gaz-W-121
|
Const. of 584m long PSC Girder Bridge over Shitalakhya river on Kapasia GC-Raniganj GC to Aralia-Lakhpur RHD road at Ch.7500m under Kapasia Upazila District: Gazipur
|
CIBRR
|
kapasia
|
333362002
|
|
584.00
|
100
|
6513.27
|
Navana Construction Ltd. Hous#28/A, Road#83, Gulshan-2, Dhaka-1212
|
422.86
|
15/05/2019
|
09/06/2019
|
27/05/2022
|
100
|
326.25
|
100
|
04/08/2024
|
|
16
|
CIB-Gaz-W-121(b)
|
"Const. of 584m long PSC Girder Bridge over Shitalakhya river on Kapasia GC-Raniganj GC to Aralia-Lakhpur RHD road at Ch.7500m under Kapasia Upazila District: Gazipur
[Road ID: 333362002]. CIB-Gaz-W-121"
|
CIBRR
|
kapasia
|
333362002
|
|
584.00
|
19
|
7167.67
|
M.M. Builders & Engineers Ltd-Confidence Infrastructure Limited JV, House#127 (6th Floor), Road-10, Block-C, Niketon,Gulshan-1, Dhaka-1212.
|
7200.96
|
12/01/2023
|
19/01/2023
|
18/01/2026
|
19
|
1300.00
|
19
|
04/08/2024
|
|
17
|
CRMIDP/GAZ/W-305
|
Amraid Bazar
|
CRMIDP
|
kapasia
|
|
|
|
92
|
295.00
|
"MCJVSTAR Harua, Kishoreganj Sadar, Kishoregonj "
|
266.78
|
21/11/2019
|
10/07/2022
|
15/01/2022
|
99
|
245.84
|
92
|
27/07/2022
|
|
18
|
CRMIDP/GAZ/W-306
|
Kawraid Bazar
|
CRMIDP
|
sreepur
|
|
|
|
66
|
212.00
|
Faisal Mollik JV
|
201.59
|
19/04/2020
|
|
08/02/2022
|
93
|
132.16
|
66
|
27/07/2022
|
|
19
|
GDP-3/Gaz-96
|
Construction of 30.00m Long PC Girder Bridge of Baria UP Office Bandhakhola Kaligonj via Baria Sonarhat Road at Ch.1300m Under Upazila: Sadar, District:Gazipur Road ID: 333303002
|
GDP-3
|
gazipur-s
|
333303002
|
|
30.00
|
|
27922542.00
|
M/S Heaven Enterprise
|
26467694.21
|
06/02/2022
|
|
|
10
|
|
|
28/06/2022
|
|
20
|
GDP-3/Gaz-89
|
Improvement of Harinal (RHD)-Pubail GC via Bari UP Office (St.from Titarkul Bridge) by BC road at Ch. 6350-8087m under Upazila : Sadar Dist: Gazipur Road ID No.333302012 Salvage Cost Tk.32,10,748.00
|
GDP-3
|
gazipur-s
|
333302012
|
1.74
|
|
|
61781929.44
|
M/S.Mostafa Kamal
|
54743622.83
|
31/01/2022
|
|
|
10
|
|
|
22/06/2022
|
|
21
|
GDP-3/Gaz-81
|
Improvement of Pirujali Alimpara Road-Baridhara Corporation Road by BC from Ch. 00-510m under Upazila : Sadar Dist: Gazipur Road ID No.333305117
Salvage Cost. 21,163.00
Package no: GDP-3/Gaz-81
|
GDP-3
|
gazipur-s
|
|
0.51
|
|
|
39.35
|
M/s Setu Enterprise
|
37.38
|
|
|
|
75
|
|
|
10/11/2021
|
|
22
|
GDP-3/Gaz-87
|
Improvement of Bashakoir KNB Bazar- Goalchala GPS via Kombolpara GPS road by BC at Ch. 3730-4620m under Upazila : Kaliakoir Dist: Gazipur Road ID No.333325057
|
GDP-3
|
kaliakoir
|
333325057
|
0.89
|
|
|
8559753.00
|
M/S. FAHIA ENTER PRISE, Pro: Hosen Ahamed, Post- Latifpur, Kaliakoir-1750, Powroshava, Kaliakoir, Gazipur
|
8131765.00
|
24/11/2021
|
|
|
40
|
|
|
28/06/2022
|
|
23
|
GDP-3/Gaz-88
|
Improvement of Fulbaria UP-Paburiachala Bazar road by BC at Ch. 5125-6000m under Upazila : Kaliakoir Dist: Gazipur Road ID No.333323003
|
GDP-3
|
kaliakoir
|
333323003
|
0.88
|
|
|
7793105.00
|
M/S Khan Revive, Pro: Md. Moshiur Rahman, 795, Begum Rokeya Saroni, Kazi Para, Mirpur-Dhaka
|
7403449.75
|
15/11/2021
|
|
|
70
|
|
|
28/06/2022
|
|
24
|
GDP-3/Gaz-79
|
Improvement of Bahadurshadi –Soiladi via Jamalpur Road by BC from Ch. 00-1995m under Union: Bahadurshadi/Jamalpur Upazila : Kaliganj Dist: Gazipur Road ID No.333344007
Salvage amount Tk. 8,60,989.00 Package no: GDP-3/Gaz-79
|
GDP-3
|
kaliakoir
|
|
2.00
|
|
|
170.06
|
M/S Amzad Traders
|
159.13
|
|
|
|
100
|
|
|
20/06/2022
|
|
25
|
GDP-3/Gaz-86
|
Improvement of Rayerchala-Golachipa school Road by BC at Ch. 1250-2250m under Upazila : Kaliakoir Dist: Gazipur Road ID No.333324042 Salvage Cost Tk 9,51,563.00
|
GDP-3
|
kaliakoir
|
333324042
|
1.00
|
|
|
9368294.00
|
Ahad Nur Enterprise, Pro: Md. Sheikh Aziz, Post- Kaliakoir, Kaliakoir Gazipur
|
8899879.00
|
24/11/2021
|
|
|
15
|
|
|
20/06/2022
|
|
26
|
235008 GDP-3/GAZ-(Reh)-24
|
a) Maintenance Of Kanchanpur bazar (R&H) Hatkhola bazar Via Rashidpur beelbaria ajgana Village road From Ch.0.00-4000m under Kaliakoir Upazila District :Gazipur Road ID No 333324014 b) Maintenance Of Muradpur Sakassor road From Ch.0.00-0.800kmm unde
|
GDP-3
|
kaliakoir
|
|
4.80
|
|
|
159.09
|
|
165.54
|
|
|
|
100
|
|
|
19/06/2022
|
|
27
|
GDP-3/Gaz-32
|
5.a) Improvement Of Talchala Bazar -Fulbaria Up Road (Fulbaria-Talchala Bazar)at Ch.3000-5050m.Under Kaliakoir Upazila District>GazipurRoad Id No. 333323004 b) Improvement Of NHW Janata Bank -Mouchak Railw
|
GDP-3
|
kaliakoir
|
|
3.87
|
|
|
295.15
|
M/S D.A Enterprise
|
274.54
|
|
|
|
80
|
|
|
19/06/2022
|
|
28
|
Package no: GDP-3/Gaz-40
|
Constuction of 63m Long RCC Girder Bridge of Benupur- Dhantara road at Ch.0+450km. over Bongshai River under Union: Dhalzora, Upazila: Kaliakoir, District: Gazipur Road ID no.333324058
Package no: GDP-3/Gaz-40
|
GDP-3
|
kaliakoir
|
|
|
63.00
|
|
410.52
|
M/s. Durga Enterprise, Pro: Shamol Chandra Saha, Dewangonj Bazar, Jamalpur
|
384.31
|
|
|
|
100
|
|
|
19/06/2022
|
|
29
|
Package no: GDP-3/Gaz- 49
|
Improvement of Kundaghata-Naloa Bazar via Golua G.P.S (Kundaghata village-Naloa bazar) Road at Ch.750-2850m. under Upazila Kaliakoir, District: Gazipur Road ID no.333324001
Salvage amount Tk. 17,16,939.00
Package no: GDP-3/Gaz- 49
|
GDP-3
|
kaliakoir
|
|
2.10
|
|
|
193.49
|
M/s. D A Enterprise, Pro: Ezarder Mukitur Rahaman, 554, West Nakhal Para, Shaheenbag, Dhaka-1215
|
181.33
|
|
|
|
65
|
|
|
19/06/2022
|
|
30
|
Package no: GDP-3/Gaz- 54
|
Improvement of Kaliakoir Dhamrai road near Khan para- Nalua Mosque Road ( Boliadi- Chandabaha) Road at Ch. 00-1465m under Union: Atabah, Upazila : Kaliakoir, Dist: Gazipur Road ID No.333324108
Salvage Cost. 5,76,047.00
Package no: GDP-3/Gaz- 54
|
GDP-3
|
kaliakoir
|
|
1.47
|
|
|
137.53
|
M/S. M.M Traders, Pro: Md. Abdur Razzak, Ward No: 02, Area: Latifpur, Kaliakair, Gazipur.
|
130.66
|
|
|
|
70
|
|
|
19/06/2022
|
|
31
|
Package no: GDP-3/Gaz-41
|
Constuction of 63m Long RCC Girder Bridge on Boraibari G.C- Boali UP road over Norakhali River at Ch.3790m. under Upazila Kaliakoir, District: Gazipur Road ID no.333322012
Package no: GDP-3/Gaz-41
|
GDP-3
|
kaliakoir
|
|
|
63.00
|
|
478.95
|
M/S Durga Enterprise, Pro: Shamol Chandra Saha, Dewangonj Bazar, Jamalpur
|
458.23
|
28/10/2020
|
|
28/09/2020
|
70
|
|
|
19/06/2022
|
|
32
|
Package no: GDP-3/Gaz-55
|
Improvement of Mazukhan Bazar Vannara Bazar Road from Ch. 00-850m under Upazila : Kaliakoir Dist: Gazipur Road ID No.333325029
Salvage Cost. 14,81,338.00
Package no: GDP-3/Gaz-55
|
GDP-3
|
kaliakoir
|
|
0.85
|
|
|
87.32
|
Geonex Builders, Pro: Mr. S.M. Jahidul Islam, Kaliakoir, Gazipur
|
82.95
|
17/11/2019
|
|
30/08/2019
|
100
|
|
|
19/06/2022
|
|
33
|
GDP-3/Gaz-65
|
Construction of 92.00m Long RCC Girder Bridge on Gachbari-Nalua Amtoli Mozidchala Road over Goalia River at ch:3450m Under Upazila: Kaliakoir, District:Gazipur Road ID: 333325155. GDP-3/Gaz-65
|
GDP-3
|
kaliakoir
|
|
|
92.00
|
|
757.70
|
Orient Trade
|
825.68
|
|
|
|
95
|
|
|
19/06/2022
|
|
34
|
GDP-3/Gaz-82
|
Improvement of Kaliakoir -Fulbaria R&H (Borachala) –Baghair Road by BC from Ch. 00-1500m under Upazila : Kaliakoir Dist: Gazipur Road ID No.333324078.
Package no: GDP-3/Gaz-82
|
GDP-3
|
kaliakoir
|
|
1.50
|
|
|
125.48
|
M/S Morol Enterprise
|
119.21
|
|
|
|
100
|
|
|
19/06/2022
|
|
35
|
GDP-3/Gaz-78
|
Improvement of NHW Mouchak-Fulbaria (GC) (Mojid Market) – Turag river ghat via misir Ali High School & Collage Road by BC from Ch. 00-1000m under Upazila : Kaliakoir Dist: Gazipur Road ID No.333324118
Salvage Cost. 7,80,581.00
Package no: GDP-3/Gaz-78
|
GDP-3
|
kaliakoir
|
|
1.00
|
|
|
104.18
|
Khan Builders,
|
98.97
|
|
|
|
100
|
|
|
19/06/2022
|
|
36
|
GDP-3/Gaz-80
|
Improvement of Bashakoir KNB Bazar- Goalchala GPS via Kombolpara GPS Road from Ch. 00-3730m under Union: Fulbaria Upazila : Kaliakoir, Dist: Gazipur Road ID No.333325057
Salvage amount Tk. 12,52,469.00 Package no: GDP-3/Gaz-80
|
GDP-3
|
kaliakoir
|
|
3.73
|
|
|
376.17
|
AMT STAR JV
|
372.28
|
|
|
|
100
|
|
|
19/06/2022
|
|
37
|
GDP-3/Gaz- 56
|
Improvement of K. N. B bazar- Janpara GPS road from Ch. 00-2000m under Union: Fulbaria, Upazila : Kaliakoir, Dist: Gazipur Road ID No.333324099
Package no: GDP-3/Gaz- 56
|
GDP-3
|
kaliakoir
|
|
2.00
|
|
|
152.17
|
AMT STAR JV,
|
158.77
|
|
|
|
100
|
|
|
11/10/2021
|
|
38
|
GDP-3/Gaz- 57
|
Improvement of Solonga-Saldah para Road from Ch. 00-3000m under Union: Fulbaria, Upazila : Kaliakoir, Dist: Gazipur. Road ID No.333324012
Salvage amount Tk. 24,31,844.00
Package no: GDP-3/Gaz- 57
|
GDP-3
|
kaliakoir
|
|
3.00
|
|
|
301.17
|
AMT STAR JV,
|
314.86
|
|
|
|
100
|
|
|
11/10/2021
|
|
39
|
Package no: GDP-3/Gaz- 37
|
Improvement of NHW, Ansar Academy – Habibpur Road at Ch.1100-2000m. under Upazila Kaliakoir, District: Gazipur Road ID no.333325191
Salvage Cost. 5,91,022.00
Package no: GDP-3/Gaz- 37
|
GDP-3
|
kaliakoir
|
|
0.90
|
|
|
68.91
|
M/S SHANAJ INTERNATIONAL, Pro: KABIR AHAMED KHAN, 795, (4TH FLOOR), KAZIPARA, MIRPUR, DHAKA-1216
|
65.47
|
|
|
|
100
|
|
|
04/02/2021
|
|
40
|
GDP-3/Gaz Market-59
|
Improvement of Fulbaria GC Under Upazila: Kaliakoir, District: Gazipur.
Package no: GDP-3/Gaz
Market-59
|
GDP-3
|
kaliakoir
|
|
|
|
|
15.00
|
CHOTUSKHON ENTERPRISE, Pro:MD.
|
14.25
|
|
|
|
100
|
100.00
|
|
09/08/2020
|
|
41
|
GDP-3/Gaz-31
|
4.a) Improvement Of R&H Haburchala Bottola -Nalua Bazar Via Gosai Bari Gps Road at Ch. 1000-2000m Under Kaliakoir Upazila District Gazipur.Road id no.333324127 b) mprovement Of Sirajpur - Kathchura (Shop Of Mofazzal -R&H -Biman Bihari Kalimondir )Road
|
GDP-3
|
kaliakoir
|
|
2.00
|
|
|
158.16
|
M/S Nurzaahan Enterprise
|
150.25
|
|
|
|
100
|
|
|
02/03/2020
|
|
42
|
GDP-3/Gaz- 43
|
Improvement of Sakashor- Akulichala Road (Sakashor Konabari GC- Akulichla Road) at Ch. 00-1000m under Upazila Kaliakoir, District: Gazipur Road ID no.333325076
Package no: GDP-3/Gaz- 43
|
GDP-3
|
kaliakoir
|
|
1.00
|
|
|
82.16
|
M/S. Jui Enterprise, Pro: Md. Jaynal Abdin, Jugitala, PS. BRRI, Joydebpur, Gazipur.
|
78.05
|
|
|
|
100
|
|
|
10/02/2020
|
|
43
|
235007 GDP-3/GAZ-(Reh)-23
|
a) Maintenance Of Ramchandropur bazar - Boheratoli School Road From Ch. 0.00-1860m Under Upazila District :Gazipur Road ID No 333324064. b) Maintenance Of kaliakoir GCCR Goalchala Road From Ch.0.00-0.468Km
|
GDP-3
|
kaliakoir
|
|
2.33
|
|
|
109.54
|
|
104.07
|
|
|
|
100
|
|
|
08/07/2019
|
|
44
|
182013 GDP-3/GAZ-(Reh)-3
|
Maintenance work of Ramchandrapur Bazar-Fulbaria UP Road (Ch.0+000-2+100km) (Road ID-333323010)
|
GDP-3
|
kaliakoir
|
|
2.10
|
|
|
55.61
|
M/S R & R Ent
|
52.83
|
|
04/06/2018
|
30/10/2018
|
100
|
|
|
|
|
45
|
GDP-3/Gaz-106
|
Improvement of Jangalia UP- Alauddin Tek Bazar road via Bonna GPS by BC at ch.1900-2865m under Upazila Kaligonj Dist.Gazipur Rooad ID No.333343019
|
GDP-3
|
kaliganj
|
333343019
|
0.97
|
|
|
100.61
|
Gorai Engineering and Construction Compani Limited
|
95.58
|
28/04/2022
|
|
|
0
|
|
|
28/06/2022
|
|
46
|
GDP-3/Gaz-107
|
Improvement of Rayerdia- Kolun road by BC at ch.00-850m under Upazila Kaligonj Dist.Gazipur Rooad ID No.333344086
|
GDP-3
|
kaliganj
|
333344086
|
0.85
|
|
|
93.01
|
Sinha Enterprise
|
88.36
|
|
|
|
0
|
|
|
28/06/2022
|
|
47
|
GDP-3/ Gaz-Reh-77
|
Maintenance of Tumulia UP-Tek Manikpur Bazar Road Via Chuarikhola Bazar Road at Ch.00-1200m under Upazila : Kaliganj Dist: Gazipur Road ID No.333343005 Salvage amount tk.1,70,538.00
|
GDP-3
|
kaliganj
|
333343005
|
1.20
|
|
|
7498024.00
|
M/S Hazi Traders
|
7123127.00
|
11/06/2020
|
|
|
100
|
|
|
20/06/2022
|
|
48
|
GDP-3/Gaz- Reh-58
|
a) Maintenance of Nagori UP H/Q – New Nawtana Bazar RHD Rd. Via Petrobangla (Kamta Gas Field) Road at Ch. 900-1900m under Upazila : Kaliganj Dist: Gazipur Road ID No.333343006
b) Maintenance of Tumuli Mission –Nagori Road at Point of Shop of Monjur – Chorakhola Non govt. Primary School (Tumuli-Nagori road Beribandth at Shop of Suraj- H/o Chandu Via Chorakhola Non govt. Primary School Road at Ch. 00-600m under Upazila : Kaliganj Dist: Gazipur Road ID No.333344124
Salvage Cost. 95,479.00
Package no: GDP-3/Gaz- Reh-58
|
GDP-3
|
kaliganj
|
|
1.60
|
|
|
116.83
|
M/S MEEM TRADEIMPEX, Pro:NAHID AHMED, BOALI, KALIGANJ, GAZIPUR
|
110.98
|
|
|
|
100
|
|
|
19/06/2022
|
|
49
|
Package no: GDP-3/Gaz-72
|
Improvement of Mazu Khan – Vatira Bazar Road from Ch. 500-1280m under Union: Upazila : Boktarpur Kaliganj Dist: Gazipur Road ID No.333344056
Salvage Cost. 14,15,997.00
Package no: GDP-3/Gaz-72
|
GDP-3
|
kaliganj
|
|
0.78
|
|
|
70.91
|
M/S MEEM TRADEIMPEX, Pro: MD. NAHID AHMED, BOALI, KALIGANJ, GAZIPUR
|
67.37
|
12/04/2020
|
|
31/01/2021
|
100
|
|
|
19/06/2022
|
|
50
|
Package no: GDP-3/Gaz-73
|
Improvement of Narun P/School-Batenhati & Narun Bazar Pucca Road- Narun Post Office Road from Ch. 500-1450m under Uniong: Jangalia, Upazila : Kaliganj Dist: Gazipur Road ID No.333345009
Salvage Cost. 5,43,076.00
Package no: GDP-3/Gaz-73
|
GDP-3
|
kaliganj
|
|
0.95
|
|
|
79.59
|
Masud Construction, Pro: Sheikh Mohammad Masud, Gazipur Sadar, Gazipur
|
75.61
|
12/04/2020
|
|
31/01/2021
|
60
|
|
|
19/06/2022
|
|
51
|
GDP-3/Gaz-71
|
Improvement of Sharsarchala Mistri Bari-Boraid Road from Ch. 1000-3000m under Upazila : Kaliganj Dist: Gazipur Road ID No.333344012
Salvage amount Tk. 9,21,018.00
Package no: GDP-3/Gaz-71
|
GDP-3
|
kaliganj
|
|
2.00
|
|
|
176.76
|
M/S Heaven Enterprise
|
170.21
|
|
|
|
55
|
|
|
19/06/2022
|
|
52
|
Package no: GDP-3/Gaz-Reh- 60
|
Maintenance of RK Jute Mill Uttar Gow Tatibazar Road at Ch.00-1000m under Upazila : Kaliganj Dist: Gazipur Road ID No.333344058
Package no: GDP-3/Gaz-Reh-60
|
GDP-3
|
kaliganj
|
|
1.00
|
|
|
30.86
|
M/S MEEM TRADEIMPEX, Pro: MD. NAHID AHMED, BOALI, KALIGANJ, GAZIPUR
|
29.32
|
10/02/2020
|
|
20/07/2020
|
100
|
|
|
07/02/2021
|
|
53
|
235010GDP-3/Gaz-(Reh)-26
|
a) maintenance Of Khalpara police capm Eidgha ch.0+00-1+125km.Under Kaligonj Upazila District:Gazipur Road ID no 33334405. b) maintenance Of Chupair -kapaisa Rd Ch. 0+00-1+430km Under Kaligonj Upazila
|
GDP-3
|
kaliganj
|
|
1.26
|
|
|
85.38
|
M/S Vhuiyan Builders
|
81.11
|
14/01/2019
|
|
|
100
|
|
|
04/11/2020
|
|
54
|
GDP-3/Gaz-(Reh)-34
|
1.a) Maintenance Of Dolian Bazar BY PASS.Road At Ch.00-305m, Under Kaligong Uapzilla District. Gazipur.Road Id No.333344051
|
GDP-3
|
kaliganj
|
|
0.31
|
|
|
54.49
|
M/S Tehcno Construction
|
51.76
|
|
|
|
100
|
|
|
08/09/2020
|
|
55
|
GDP-3/Gaz-Market-66
|
Rehabilitation of Borgaon Hat Upazila: Kaliganj, District: Gazipur
Package no: GDP-3/Gaz-Market-66
|
GDP-3
|
kaliganj
|
|
|
|
|
14.97
|
SHAHIDULLAH ENTERPRISE
|
14.22
|
|
|
|
100
|
|
|
09/08/2020
|
|
56
|
Package no: GDP-3/Gaz- 38
|
2. a) Improvement of Mukterpur UP – Akota Ferry Ghat Bazar Road via Kalihashi Road at Ch.800-1500m. under Upazila Kaliganj, District: Gazipur Road ID no.333343021
b) Improvement of Showraid GC- Dolon Bzar Road via Borogaon Bazar Road at Ch.2250-3920m. under Upazila Kaliganj, District: Gazipur Road ID no.333343008 Salvage Cost Tk. 5,56,293.00
c) Improvement of Ulukhola – Termokh Bridge Jelepara Dineshbari via Karaihati Monshibari Mosjid Road at Ch.00-1250m. under Upazila Kaliganj, District: Gazipur Road ID no.333345176
Salvage Cost Tk. 1,26,331.00
Package no: GDP-3/Gaz- 38
|
GDP-3
|
kaliganj
|
|
3.62
|
|
|
311.04
|
M/S. Amzad Traders
|
298.18
|
|
|
|
100
|
|
|
01/01/2020
|
|
57
|
GDP-3/Gaz-Reh-27
|
Maintenance Of Bhaiasuti-Bhat Para (Bangla) Road at Ch. 00-1150m Under Kaligonj Upazila, District.Gazipur.Road Id No. 333344022
|
GDP-3
|
kaliganj
|
|
1.15
|
|
|
39.25
|
M/S Nahid Enterprise
|
37.28
|
|
|
|
100
|
|
|
04/12/2019
|
|
58
|
189819 GDP-3/Gaz-15
|
Improvement of Azmotpur Morol Bari Pacca road to Tilsuniya Khideertack Road Ch.0+00-1+500km (Road ID-333345177)
|
GDP-3
|
kaliganj
|
|
1.50
|
|
|
106.85
|
M/S Mukul Ent.
|
101.51
|
|
25/06/2018
|
31/03/2019
|
100
|
|
|
09/10/2019
|
|
59
|
235009GDP-3/Gaz-(Reh)-25
|
a) maintenance Of Showraid GC -Dolon bazar Rd via Borogaon Bazar .Ch.4+060-5+150km Under Kaligonj Upazila District .Gazipur Road ID no 333343008. b) maintenance Of Tumulia Mishion-Piprar Shair Rd.Ch.00-750m.
|
GDP-3
|
kaliganj
|
|
2.35
|
|
|
64.18
|
M/S Amzad Traders
|
60.97
|
|
|
|
100
|
|
|
08/07/2019
|
|
60
|
191526 GDP-3/Gaz-8
|
Improvement of Sanmania Etimkhana Madrasha-Gabtoli More Via Mollah Bari Road (Ch.00-1040m) (Road ID-333364235)
|
GDP-3
|
kapasia
|
|
1.04
|
|
|
79.93
|
M/S MERCY Enterprise
|
75.93
|
|
|
|
100
|
|
|
28/06/2022
|
|
61
|
GDP-3/ Gaz-85
|
Improvement of Kapasia Kaliganj RHD Road Osinir Bari-Rajabari GC- Chandpur GC road by BC at Ch. 00-1500m under Upazila : Kapasia Dist: Gazipur Road ID No.333364137
|
GDP-3
|
kapasia
|
333364137
|
1.50
|
|
|
12617559.00
|
M/S Tarim Enterprise
|
11986681.50
|
29/09/2021
|
|
|
45
|
|
|
28/06/2022
|
|
62
|
GDP-3/Gaz-93
|
Improvement of Dhandia Kalibari–Bhabani Ghat (Dhandia Kalibari St. from BC road – Hijolia Pacca) Road by BC at Ch. 00-930m under Upazila : Kapasia Dist: Gazipur Road ID No.333365259
Salvage Cost BDT: 56,944.00
Package no: GDP-3/Gaz-93
|
GDP-3
|
kapasia
|
333365259
|
0.93
|
|
|
8709045.00
|
Aamaira Construction & Co.
|
8273592.00
|
02/01/2022
|
|
|
60
|
|
|
28/06/2022
|
|
63
|
GDP-3/Gaz-94
|
Improvement of Rampur High School – Pirozpur Dakhin Para Via Sikder Bari Jame Mosque Road by BC at Ch. 00-600m under Upazila : Kapasia Dist: Gazipur Road ID No.333365031
Salvage Cost BDT: 5,47,517.00
Package no: GDP-3/Gaz-94
|
GDP-3
|
kapasia
|
333365031
|
0.60
|
|
|
5817641.00
|
MS M.R. ENTERPRISE
|
5526758.00
|
05/01/2022
|
|
|
40
|
|
|
28/06/2022
|
|
64
|
GDP-3/Gaz-97
|
Improvement of Aral Hatirdia R&H Road Shabeb Ali Market – Aral Kamar Bari Via Tetultala more ( Aral Profulla bari Pucca Road Connecting – Mirza Nagar Girls high School-Mirzanagar Bazar Pucca Road by BC at Ch. 0.00-3000.00m under Upazila : Kapasia Dist: Gazipur Road ID No.333364097 Salvage Cost: BDT. 8,08,385.00
Package no: GDP-3/Gaz-97
|
GDP-3
|
kapasia
|
333364097
|
3.00
|
|
|
23861640.00
|
m/s ibrahim construction
|
21475476.00
|
22/02/2022
|
|
|
25
|
|
|
28/06/2022
|
|
65
|
GDP-3/Gaz-99
|
Improvement of Torgoan Purbopara Eidgah Jamee Mosque –Nobipur (Noradia) Road by BC at Ch. 00-1350.00m under Upazila : Kapasia Dist: Gazipur Road ID No.333365216
|
GDP-3
|
kapasia
|
333365216
|
1.35
|
|
|
12075339.00
|
M/S. S. ALAM CONSTRUCTION
|
11471572.00
|
24/01/2022
|
|
|
40
|
|
|
28/06/2022
|
|
66
|
GDP-3/Gaz-101
|
Improvement Sanmania lta Khola to Mendir Baper Bari via Boro Kandha (Kaliabo Hafizia Madrasha Near of Paca Road – Dokhingha- Kalibo Dakhil Madrasha Near of Paca Road) by BC at Ch. 00-2100.00m under Upazila : Kapasia Dist: Gazipur Road ID No.333365232
Salvage Cost BDT: 3,13,417.00
Package no: GDP-3/Gaz-101
|
GDP-3
|
kapasia
|
333365232
|
2.10
|
|
|
17644938.00
|
M/S MAHMUD ENTERPRISE
|
16762691.00
|
27/01/2022
|
|
|
55
|
|
|
28/06/2022
|
|
67
|
GDP-3/Gaz-105
|
Construction of 30.00m Long PSC Girder Bridge on Moysa Dhamna Bazar -Charpara road at ch.24m Under Upazila Kapasia,District.gazipur Road ID No.333364036
|
GDP-3
|
kapasia
|
333364036
|
|
30.00
|
|
272.25
|
Faridpur Jannat Construction
|
254.10
|
18/04/2022
|
|
|
0
|
|
|
28/06/2022
|
|
68
|
GDP-3/Gaz-95
|
Improvement of Durgapur Union H/Q Kamramashuk Siniar Madrasha Road (Abdullah House) – Chatarbag Bus Stand (Madrasha Road (Abdullah House) Chatarbag Bus Stand) Road by BC at Ch. 850-1400m under Upazila : Kapasia Dist: Gazipur Road ID No.333365071
Salvage Cost BDT: 6,10,864.00
Package no: GDP-3/Gaz-95
|
GDP-3
|
kapasia
|
333365071
|
0.55
|
|
|
4529764.00
|
M/S Jalil Enterprise
|
4303275.00
|
05/01/2022
|
|
|
40
|
|
|
22/06/2022
|
|
69
|
GDP-3/Gaz-98
|
Improvement of Dakhingaon RHD Road Ramij Uddin Mkt-Dakhingaon Hazi Bari Mosque RHD Road.( Dokhin Gha Hazibari Mosque ( Ebrahim Prodhan) Near of Paca Road-Dokhin Gha Kaliar Dakhil Madrasha to Misu Mistre House Road) Road by BC at Ch. 00-838.00m under Upazila : Kapasia Dist: Gazipur Road ID No.333365256
Salvage Cost BDT: 42,610.00
Package no: GDP-3/Gaz-98
|
GDP-3
|
kapasia
|
333365256
|
0.84
|
|
|
9445199.00
|
M/s Setu Enterprise
|
8972939.00
|
31/01/2022
|
|
|
25
|
|
|
22/06/2022
|
|
70
|
GDP-3/Gaz-100
|
Improvement of Barishabo Nurar Pul-Banar River Purchim Side Batna LGED Pacca Road by BC at Ch. 0.00-2000.00m under Upazila : Kapasia Dist: Gazipur Road ID No.333365346
Salvage Cost BDT: 3,24,014.00
Package no: GDP-3/Gaz-100
|
GDP-3
|
kapasia
|
333365346
|
2.00
|
|
|
16379384.00
|
M/S. Jaman Enterprise
|
15560414.00
|
25/01/2022
|
|
|
5
|
|
|
22/06/2022
|
|
71
|
GDP-3/Gaz-102
|
Construction of 20.00m Long RCC Girder Bridge on Taragonj Bazar-Ghatkuri Bazar Road at Ch.3000m Under Upazila: Kapasia, District: Gazipur Road ID: 333362011
Salvage Cost: BDT. 82,194.00
Package no: GDP-3/Gaz-102
|
GDP-3
|
kapasia
|
333362011
|
|
20.00
|
|
23962599.00
|
M/S Musfiqur Rahman (Kanchan)
|
21566339.00
|
24/02/2022
|
|
|
5
|
|
|
22/06/2022
|
|
72
|
GDP-3/Gaz-103
|
Construction of 20.00m Long RCC Girder Bridge on Kapasia GC-Kaligonj GC Road at Ch.9500m Under Upazila: Kapasia, District: Gazipur Road ID: 333362004
Salvage Cost: BDT. 79,816.00
Package no: GDP-3/Gaz-103
|
GDP-3
|
kapasia
|
333362004
|
|
20.00
|
|
21079791.00
|
M/S Musfiqur Rahman (Kanchan)
|
18971811.00
|
24/02/2022
|
|
|
5
|
|
|
22/06/2022
|
|
73
|
GDP-3/Gaz-104
|
Construction of 25.00m Long PSC Girder Bridge on Rayed UP H/Q – Dulalpur Bazar via Moision Miar Bazar Road at Ch.10700km Under Upazila: Kapasia, District: Gazipur Road ID: 333363001
Salvage Cost: BDT. 64,407.00
Package no: GDP-3/Gaz-104
|
GDP-3
|
kapasia
|
333363001
|
|
25.00
|
10
|
22938145.00
|
M/S Musfiqur Rahman (Kanchan)
|
20644330.00
|
24/02/2022
|
|
|
10
|
|
10
|
22/06/2022
|
|
74
|
189816 GDP-3/Gaz-12
|
Improvement of Aral to Aralia Pucca Road (H/Q Awal)-Kamargaon School via Zab Village road at (Ch.1200-2200m) (Road ID-333365042)
|
GDP-3
|
kapasia
|
|
1.00
|
|
|
65.51
|
M/S MR Ent.
|
62.23
|
|
05/06/2018
|
12/11/2018
|
100
|
|
|
19/06/2022
|
|
75
|
225723 GDP-3/Gaz-21
|
a) Improvement of Toke Union H/Q -(Toke GC More )- Hariadi Kheya Ghata Via Shohagpur Bazar Road Ulusara Bazar at Ch.4400-6350 m And Ch. 8850-9650m. Under Upazila Kapasia, District Gazipur.Road ID no333363018.
|
GDP-3
|
kapasia
|
|
2.95
|
|
|
253.38
|
Sreete Enterprise
|
250.07
|
|
|
|
100
|
|
|
19/06/2022
|
|
76
|
Package no: GDP-3/Gaz- 47
|
Improvement of Toke Union H/Q- Pachua Bazar Road at Ch. 3300-5700m under Union: Toke, Upazila : Kapasia, Dist: Gazipur Road ID No.333363020
Salvage Cost Tk. 10,62,921.00
Package no: GDP-3/Gaz- 47
|
GDP-3
|
kapasia
|
|
2.40
|
|
|
179.81
|
m.s. belal & brothers, Pro: Md. billal Hossain, House-407, Road-29, New DOHS, Mohakhali, Dhaka-1206.
|
170.82
|
|
|
|
100
|
|
|
10/11/2021
|
|
77
|
GDP-3/Gaz-28
|
1.a) Improvement Of Aral Bazar -Aralia R&H Road (St. From Mia Para GPS )- Kamargoan Bazar Road At Ch. 2000-3670m. Under Upazila Kapasia District.Gazipur.Road Id No. 333364074. b) Improvement Of Chandpur Ba
|
GDP-3
|
kapasia
|
|
4.77
|
|
|
344.54
|
M/S shanta Enterprise
|
342.47
|
|
|
|
100
|
|
|
11/10/2021
|
|
78
|
GDP-3/Gaz-35
|
Construction of 48.00m Long RCC Girder Bridge on Manik Bazar Charmonohordi -Sonmania Bazar Road at Ch.1150, Under Kapasia Upaziala ,District:Gazipur Road Id no.333365114
|
GDP-3
|
kapasia
|
|
|
48.00
|
|
342.47
|
RHB JV
|
335.81
|
|
|
|
100
|
|
|
29/08/2021
|
|
79
|
Package no: GDP-3/Gaz- 48
|
Construction of 20m Long RCC Girder Bridge on Deona Kachair Bazar – Borhor Bazar Road at Ch.00m Under Upazila: Kapasia, District: Gazipur Road ID No. 333364047
Package no: GDP-3/Gaz- 48
|
GDP-3
|
kapasia
|
|
|
20.00
|
|
161.28
|
Bachchu Hamid JVCA, Kapasia, Gazipur
|
150.18
|
|
|
|
100
|
14836353.00
|
|
29/08/2021
|
|
80
|
214126 GDP-3/Gaz-19
|
a)Improvement of Aral bazar -Aralia R&H Road (St. From Mia para GPS )- Kamargoan Bazar Road. at (Ch.1000-2000m) (Road ID-333364074 b)Improvement of Bulesshor khalpar Pacca Rasta Bala Banga bazar Via Mofiz chairman h
|
GDP-3
|
kapasia
|
|
2.80
|
|
|
193.36
|
M/S Sharafat Ent.
|
183.69
|
|
28/10/2018
|
04/09/2019
|
100
|
|
|
08/10/2020
|
|
81
|
Package no: GDP-3/Gaz- 36
|
1. a) Improvement of Dhakhingoan goni Market- Aral-Hatirdia Road via Shahiddullah bari( Dhakhingoan goni Market(St.from RHD Road) –Aral- Hatirdia Road) at Ch. 00-1500m. under Upazila Kapasia, District: Gazipur Road ID no 333364009(333365233)
b) Improvement of Barjana-Pabur Bazar Road at Ch.4360-5500m. under Upazila Kapasia, District: Gazipur Road ID no.333364020
c) Improvement of Ballkhalar Bazar-Moragangi Road at Ch.3240-4740m. under Upazila Kapasia District: Gazipur Road ID no.333364002
Salvage Cost Tk. 4,58,765.00
Package no: GDP-3/Gaz- 36
|
GDP-3
|
kapasia
|
|
4.14
|
|
|
303.09
|
M/S. Shanta Enterprise
|
292.17
|
|
|
|
100
|
|
|
08/10/2020
|
|
82
|
GDP-3/Gaz-29
|
2.a) Improvement Of Rayed Union H/Q -Dulalpur Bazar Via Maison Miar Bazar Road at Ch.7600-9600m. Under Upazila Kapasia,District.Gazipur.Road ID No.333363001. b) Improvement Of Rayed Union H/Q -Dulalpur Bazar Via Maison Mi
|
GDP-3
|
kapasia
|
|
2.95
|
|
|
222.06
|
M/S Bishal Khurshid
|
218.78
|
|
|
|
100
|
|
|
09/08/2020
|
|
83
|
Package no: GDP-3/Gaz- 45
|
Improvement of Kapasia GC (Risibari More)-Gee Ghat (RHD) via Equria Bazar Road at Ch. 7700-9850m under Union: Korihata Sanmania, Upazila: Kapasia, District: Gazipur Road ID no.333362014
Package no: GDP-3/Gaz- 45
|
GDP-3
|
kapasia
|
|
2.15
|
|
|
159.57
|
AK (JV) M/s. Alam Enterprise & Khorshed Enterprise (JV) Kapasia, Gazipur
|
151.08
|
|
|
|
100
|
|
|
09/08/2020
|
|
84
|
225724GDP-3/Gaz-22
|
a) Improvement of Palaspur Bazar - Fulbaria Bazar Road at Ch. 500-2200 Under Upazila:Kapasia : District Gazipur.Road ID no:333364049 b) Improvement Of Maision Miar Bazar -Uttor Khamaer Pakrir Bazar Road at Ch. 00-880m Under Upazila:Kapasia
|
GDP-3
|
kapasia
|
|
3.17
|
|
|
216.88
|
M/S Amzad Traders
|
213.80
|
|
|
|
100
|
|
|
07/07/2020
|
|
85
|
189817 GDP-3/Gaz-13
|
Improvement of Kapasia-Surjanarayanpur Bazar Road at (Ch.3950-5450m) (Road ID-333364012)
|
GDP-3
|
kapasia
|
|
1.50
|
|
|
100.95
|
M/S Sharafat Ent.
|
95.90
|
|
21/06/2018
|
29/03/2019
|
100
|
|
|
10/02/2020
|
|
86
|
GDP-3/Gaz-30
|
3.a) Improvement Of Dashuarayanpur Bazar -Rawtkona Bazar Via BRAC Office Road Ch. 2050-4050m. Under upazila Kapasia District.Gazipur.Road Id No.333364013. b) Improvement Of Baoride Pacca Road -Baoride Gov.Pry.S
|
GDP-3
|
kapasia
|
|
4.00
|
|
|
297.81
|
M/S Rahman Brothers
|
278.78
|
|
|
|
100
|
|
|
10/02/2020
|
|
87
|
214124 GDP-3/Gaz-17
|
a)Improvement of Jamirarchar Petrol Pump (RHD) - Kapasia GC (Kapasia Ranigonj Road Tatulia) Via Rowtkona, Kandania, Khodadia, Borjona Road.(Ch.00-1060m) (Part-a) b) Improvement of Jamirarchar Petrol Pump (RHD) - Kapasia GC (Kapasia Ranigonj Road Tatu
|
GDP-3
|
kapasia
|
|
2.86
|
|
|
243.44
|
M/S. Rahman Brothers
|
254.85
|
29/11/2018
|
|
|
100
|
|
|
01/01/2020
|
|
88
|
191521 GDP-3/Gazi-6
|
Maniker mar Bridge-Khoirapara Eidgah Field Road (Ch.1000-2000m) (Road ID-333364113)
|
GDP-3
|
kapasia
|
|
1.00
|
|
|
66.80
|
M/S Maa Ent.
|
63.46
|
|
10/06/2008
|
17/12/2018
|
100
|
|
|
04/12/2019
|
|
89
|
214125 GDP-3/Gaz-18
|
Improvement of Jamirarchar Petrol Pump (RHD) - Kapasia GC (Kapasia Ranigonj Road Tatulia) Via Rowtkona, Kandania, Khodadia, Borjona Road.(Ch.2864-6057m) (Part-b) Road ID-333362020)
|
GDP-3
|
kapasia
|
|
3.19
|
|
|
169.59
|
SM Enterprice
|
161.11
|
|
18/10/2018
|
24/08/2019
|
100
|
|
|
04/12/2019
|
|
90
|
191522 GDP-3/Gaz-7
|
Ghoshabo Bazar-Sanmania Bazar road (Ch.00-2500m) (Road ID-333364088)
|
GDP-3
|
kapasia
|
|
2.50
|
|
|
164.50
|
M/S Nazmul Hque
|
156.28
|
|
05/06/2018
|
12/01/2019
|
100
|
|
|
09/10/2019
|
|
91
|
191520 GDP-3/Gazi-5
|
Kamargoan Bazar-Shaldoi Bazar Road Via Kamargoan High & Govt. Primary School Road (Ch.1000-3000m) (Road ID-333364131)
|
GDP-3
|
kapasia
|
|
2.00
|
|
|
135.82
|
M/S Sharafat Ent.
|
129.03
|
|
12/06/2018
|
19/03/2019
|
100
|
|
|
06/09/2019
|
|
92
|
196729 GDP-3/Gaz-16
|
Improvement of Moishadhamna Bazar - Chakpara(Charpara) Road at (Ch.00-780m) (Road ID-333364036)
|
GDP-3
|
kapasia
|
|
0.78
|
|
|
52.43
|
Mayer Dua
|
49.81
|
|
01/08/2018
|
08/01/2019
|
100
|
|
|
08/07/2019
|
|
93
|
225722 GDP-3/Gaz-20
|
a)a) Improvement of kapasia GC (Risibari More )-Gee Ghat (RHD) via Equria Bazar Road at Ch.5700-7700m Under Upazila Kapasia, District Gazipur.Road ID no: 333362014. b) Improvement of Baghia Chinaduli Bazar – Trimohan
|
GDP-3
|
kapasia
|
|
4.00
|
|
|
267.82
|
Bishal Khurshid JV
|
259.17
|
|
|
|
100
|
|
|
08/07/2019
|
|
94
|
191530 GDP-3/GAZ-(Reh)-10
|
Maintenance of Balkhelar Bazar-Moragangi Road (Ch.00-3040m) (Road ID-333364002)
|
GDP-3
|
kapasia
|
|
3.04
|
|
|
37.92
|
M/S ripon Ent.
|
36.02
|
|
13/08/2018
|
20/01/2019
|
100
|
|
|
06/05/2019
|
|
95
|
191529 GDP-3/Gaz-9
|
Manik Bazar-Charmonohordi-Sanmania Bazar Link Road (Charmonohordi Part) Road (Ch.1000-1800m) (Road ID-333364114)
|
GDP-3
|
kapasia
|
|
0.80
|
|
|
55.03
|
M/S Maa Ent.
|
52.28
|
|
10/06/2018
|
17/12/2018
|
100
|
|
|
07/03/2019
|
|
96
|
191538 GDP-3/GAZ-(Reh)-11
|
Maintenance of Kamargaon Bazar-Shaldoi Bazar Road (Ch.00-820m) (Road ID-333364007)
|
GDP-3
|
kapasia
|
|
0.82
|
|
|
15.94
|
M/S Star Ent.
|
15.14
|
|
10/06/2018
|
17/08/2018
|
100
|
|
|
|
|
97
|
189818 GDP-3/Gaz-14
|
Improvement of Toke UP-Aralia Road Ponchoboti Bridge via Shimaltali Bridge Road at (Ch.00-500m) (Road ID-333365248)
|
GDP-3
|
kapasia
|
|
0.50
|
|
|
34.48
|
M/S S.S Builders
|
32.76
|
|
10/06/2018
|
17/09/2018
|
100
|
|
|
|
|
98
|
GDP-3/Gaz-84
|
Construction of 27.00m Long PSC Girder Bridge on Sreepur GC to Bormi GC Road at Ch.7900m Under Upazila: Sreepur, District:Gazipur Road ID: 333862001
|
GDP-3
|
sreepur
|
333862001
|
|
27.00
|
|
26053221.00
|
M/S Musfiqure Rahman (Kanchan)
|
23673005.52
|
04/10/2021
|
|
|
15
|
|
|
28/06/2022
|
|
99
|
GDP-3/Gaz-90
|
Improvement of Bormi UPC- Bauni Bazar Road by BC at Ch. 00-1800m under Upazila : Sreepur Dist: Gazipur Road ID No.333863005
|
GDP-3
|
sreepur
|
333863005
|
|
|
|
14219505.00
|
M/S Sohel Enterprise
|
13508529.00
|
02/01/2022
|
|
|
25
|
|
|
28/06/2022
|
|
100
|
GDP-3/Gaz-91
|
Improvement of Jahangirpur - Jogirsit Road by BC at Ch. 2000-3000m under Upazila : Sreepur Dist: Gazipur Road ID No.333865007
|
GDP-3
|
sreepur
|
333865007
|
1.00
|
|
|
8396785.00
|
M/S SHARAFAT ENTERPRISE,
|
7976945.00
|
02/01/2022
|
|
|
50
|
|
|
28/06/2022
|
|
101
|
GDP-3/Gaz-92
|
Improvement of Soilat - Southpara Road by BC at Ch. 00-1000m under Upazila : Sreepur Dist: Gazipur Road ID No.333865070
|
GDP-3
|
sreepur
|
333865070
|
1.00
|
|
|
8242267.00
|
SARIFA ENTERPRISE
|
7830153.00
|
02/01/2022
|
|
|
70
|
|
|
28/06/2022
|
|
102
|
GDP-3/Gaz-76
|
Improvement of Damloi (H/Q) Mofiz Master primary School via Fokir Bazar Bagmara Bridge road from Ch. 00-530m under Union: Kawraid, Upazila : Sreepur Dist: Gazipur Road ID No.333865322
Package no: GDP-3/Gaz-76
|
GDP-3
|
sreepur
|
|
0.53
|
|
|
46.04
|
ALAM ENTERPRISE,
|
43.74
|
|
|
|
100
|
|
|
20/06/2022
|
|
103
|
GDP-3/Gaz-83
|
Construction of 90.00m Long PSC Girder Bridge on Kawraid on UPC – Lalpokurepar Bazar via Shimul toly Bazar Over Matikata River Road at Ch.2700m Under Upazila: Sreepur, District:Gazipur Road ID: 333863022
|
GDP-3
|
sreepur
|
333863022
|
|
90.00
|
|
72954530.00
|
M/S MERCY Enterprise
|
66049862.34
|
21/10/2021
|
|
|
40
|
|
|
20/06/2022
|
|
104
|
203867 GDP3/Gazi-1
|
Improvement of Udoykhali-Pelaid Road (Ch.2000-3500m) (Road ID-333865045).
|
GDP-3
|
sreepur
|
|
1.50
|
|
|
97.98
|
Nawar Trade
|
93.08
|
|
05/09/2018
|
12/05/2019
|
100
|
|
|
19/06/2022
|
|
105
|
GDP-3/Gazi-33
|
a) Improvement Of Fawgun -bashkopa Road At ch.00-1000m Under Sreepur Upazila ,District.GazipurRoad iD No.333865227 b) Improvement Of Mauna Fulbaria badnevanga GPS & Noton Bazaar Via Kitab Ali market Road (Gazipur Ful
|
GDP-3
|
sreepur
|
|
2.99
|
|
|
242.11
|
|
239.50
|
|
|
|
100
|
8500000.00
|
|
19/06/2022
|
|
106
|
Package no: GDP-3/Gaz- 51
|
Improvement of Sonabo kawraid- Galdapara Shimanta Bazar Road From Ch. 00-2000m under Union: Kawraid, Upazila : Sreepur, Dist: Gazipur Road ID No.333865105
Salvage amount Tk. 1,62,068.00
Package no: GDP-3/Gaz-51
|
GDP-3
|
sreepur
|
|
2.00
|
|
|
208.32
|
M/s. D A Enterprise, Pro: Ezarder Mukitur Rahaman, 554, West Nakhal Para, Shaheenbag, Dhaka-1215
|
195.55
|
10/12/2019
|
|
30/12/2020
|
45
|
|
|
19/06/2022
|
|
107
|
GDP-3/Gaz-63
|
Improvement of Bapta-Kawraid Road from Ch. 600-2000m under Upazila : Sreepur Dist: Gazipur Road ID No.333864060
Salvage Cost. 5,81,880.00
Package no: GDP-3/Gaz-63
|
GDP-3
|
sreepur
|
|
1.40
|
|
|
118.82
|
R. P. Engineers
|
112.88
|
|
|
|
100
|
|
|
19/06/2022
|
|
108
|
GDP-3/Gaz-74
|
Improvement of Baldighat Bazar-Haydebpur via Goldapara Road from Ch. 500-1500m under Union: Pohladpur, Upazila : Sreepur, Dist: Gazipur Road ID No.333865109
Salvage Cost. 96,366.00
Package no: GDP-3/Gaz-74
|
GDP-3
|
sreepur
|
|
1.00
|
|
|
77.85
|
TANVIR ENTERPRISE
|
73.96
|
|
|
|
100
|
|
|
19/06/2022
|
|
109
|
GDP-3/Gaz-68
|
Improvement of Patharpara –Indrapur Road from Ch. 2000-3420m under Upazila : Sreepur Dist: Gazipur Road ID No.333864016
Package no: GDP-3/Gaz-68
|
GDP-3
|
sreepur
|
|
1.42
|
|
|
117.88
|
M/S MOMEN ENTERPRISE
|
111.99
|
|
|
|
100
|
|
|
19/06/2022
|
|
110
|
GDP-3/Gaz-69
|
Improvement of Fawgun-Bashkopa link Road from Ch. 1000-1870m under Upazila: Sreepur Dist: Gazipur Road ID No.333865227
Salvage Cost. 2,04,237.00
Package no: GDP-3/Gaz-69
|
GDP-3
|
sreepur
|
|
0.87
|
|
|
70.81
|
MS. S.R ENTERPRISE
|
67.27
|
|
|
|
100
|
|
|
19/06/2022
|
|
111
|
GDP-3/Gaz-70
|
Improvement of Fawgun-Nircchentopur Road from Ch. 00-1000m under Upazila : Sreepur Dist: Gazipur Road ID No.333865317
Package no: GDP-3/Gaz-70
|
GDP-3
|
sreepur
|
|
1.00
|
|
|
77.55
|
SAKIB ENTERPRISE
|
73.68
|
|
|
|
100
|
|
|
19/06/2022
|
|
112
|
GDP-3/Gaz-75
|
Improvement of Shimlapara Bat tala-Badni banga Ali!s house bridge Road from Ch. 00-1000m under Union: Mawna, Upazila : Sreepur Dist: Gazipur Road ID No.333864037
Salvage Cost. 1,11,069.00
Package no: GDP-3/Gaz-75
|
GDP-3
|
sreepur
|
|
1.00
|
|
|
80.18
|
Masud Construction
|
76.17
|
|
|
|
100
|
|
|
19/06/2022
|
|
113
|
GDP-3/Gaz-62
|
Improvement of Nagorhaola Village Muktijodha Iman Ali Road from Ch. 00-1000m under Upazila : Sreepur Dist: Gazipur Road ID No.333865318
Salvage Cost. 1,43,002.00
Package no: GDP-3/Gaz-62
|
GDP-3
|
sreepur
|
|
1.00
|
|
|
85.28
|
SHAHIDULIAH ENTERPRISE
|
81.01
|
|
|
|
100
|
|
|
11/10/2021
|
|
114
|
GDP-3/Gaz-67
|
Improvement of Kasempur (Bazar)-Barotopa via Goldapara GPS Road from Ch. 00-1000m under Upazila : Sreepur Dist: Gazipur Road ID No.333865308
Salvage Cost. 4,90,972.00
Package no: GDP-3/Gaz-67
|
GDP-3
|
sreepur
|
|
1.00
|
|
|
81.27
|
M/S Nehim Enterprise
|
77.20
|
|
|
|
70
|
|
|
10/10/2021
|
|
115
|
GDP-3/Gaz-64
|
Improvement of Izzatpur-Halukaid Road from Ch. 00-1580m under Upazila : Sreepur Dist: Gazipur Road ID No.333865072
Salvage Cost. 3,59,765.00
Package no: GDP-3/Gaz-64
|
GDP-3
|
sreepur
|
|
1.58
|
|
|
121.30
|
M/S.Ataur & Brothers, Pro: Md. Ataur Rahman, Cadda Bazar, Joydebpur, Gazipur-17000
|
115.23
|
|
|
|
100
|
11522821.00
|
|
29/08/2021
|
|
116
|
Package no: GDP-3/Gaz- 53
|
Improvement of Tirmohini (Bhumihin) Busstand – Satkhamair Road From Ch. 00-1620m under Union: Barmi , Upazila : Sreepur, Dist: Gazipur Road ID No.333865013
Salvage Cost. 10,75,101.00
Package no: GDP-3/Gaz- 53
|
GDP-3
|
sreepur
|
|
1.62
|
|
|
129.63
|
M/S. Chowdhury Trading Corporation, Pro: Monir Hossain Chowdhury, Village- Kadda, P/O. Kadda Bazar, Gazipur Sadar, Gazipur
|
123.15
|
|
|
|
100
|
|
|
04/02/2021
|
|
117
|
GDP-3/Gaz-61
|
Improvement of Nagar Hawla Primary School-Nasir Glass (Factori) Road from Ch. 00-1000m under Upazila: Sreepur Dist: Gazipur Road ID No.333865320
Package no: GDP-3/Gaz-61
|
GDP-3
|
sreepur
|
|
1.00
|
|
|
81.79
|
M/s Almas Construction and Gas Co,
|
77.70
|
|
|
|
100
|
|
|
02/02/2021
|
|
118
|
GDP-3/Gaz-42
|
a) Improvement of Kawraid UPC-Lalpokure Bazar via Simul toly Bazar Road at Ch. 2500-4600m under Union: Kawraid, Upazila: Sreepur, District: Gazipur Road ID no.333863022
Salvage Cost 33,367.00
b) Improvement of Kawraid UPC-Lalpokure Bazar via Simul toly Bazar Road at Ch.4600-6400m & 7400-7620m. under Union: Kawraid, Upazila: Sreepur, District: Gazipur Road ID no.333863022
Salvage Cost 7,87,530.00
Package no: GDP-3/Gaz-42
|
GDP-3
|
sreepur
|
|
4.12
|
|
|
357.70
|
M/S Kohinoor Enterprise and Combined Development Corporation JV
|
357.62
|
|
|
|
100
|
|
|
06/12/2020
|
|
119
|
Package no: GDP-3/Gaz- 50
|
Improvement of Bapta GPS Ghuniaguri Railway line Road at Ch. 00-1390m under Union: Kawraid, Upazila : Sreepur, Dist: Gazipur Road ID No.333865151
Salvage Cost. 8,84,703.00
Package no: GDP-3/Gaz- 50
|
GDP-3
|
sreepur
|
|
1.39
|
|
|
105.04
|
SHAHIDULLAH ENTERPRISE, Pro: Md. SHAHIDULLAH SARDAR, RAJARAMPUR, BHAWAL, RAJBARI, SREEPUR, GZIPUR.
|
99.79
|
|
|
|
100
|
|
|
06/12/2020
|
|
120
|
GDP-3/Gaz-44
|
a) Improvement of Bormi UPC (PUC)-Bauni Bazar Road at Ch.5525-7575m. under Union: Urme/Goshinga, Upazila : Sreepur, District: Gazipur Road ID no.333863005
Salvage Cost 1,89,988.00
b) Improvement of Goshinga-Savarchala (P/School) Road at Ch.00-1000m. under Union:Goshinga, Upazila : Sreepur, District: Gazipur Road ID no.333865121
Package no: GDP-3/Gaz-44
|
GDP-3
|
sreepur
|
|
3.05
|
|
|
254.62
|
M/S Kohinoor Enterprise and Combined Development Corporation JV,
|
254.48
|
|
|
|
100
|
|
|
04/11/2020
|
|
121
|
Package no: GDP-3/Gaz- 52
|
Improvement of Bawni Montaz Dr.More - Rahman Monshi bari (Bawni Bazar – Lohagach ) Road From Ch. 00-1000m under Union: Gosinga, Upazila : Sreepur, Dist: Gazipur Road ID No.333865222
Package no: GDP-3/Gaz- 52
|
GDP-3
|
sreepur
|
|
1.00
|
|
|
79.63
|
M. Sarkar & CO Pro: Md. Sahadat Hossain Mukul, Akata Super Market, Thana Council, Gazipur
|
75.65
|
|
|
|
100
|
|
|
09/08/2020
|
|
122
|
Package no: GDP-3/Gaz- 46
|
Improvement of Gazipur UPC-Shimlapara Bazar Road at Ch. 1500-3670m under Union: Gazipur, Upazila Sreepur, District: Gazipur Road ID no.333863015
Salvage Cost 13,19,769.00
Package no: GDP-3/Gaz- 46
|
GDP-3
|
sreepur
|
|
2.17
|
|
|
164.44
|
M/s. Amzad Traders, Pro: Md. Faruk Mia, Mulganj, Kaliganj, Gazipur
|
162.88
|
|
|
|
100
|
|
|
07/07/2020
|
|
123
|
189606 GDP-3/Gazi-4
|
Improvement of Faugan-Lakkipur Road Ch.973-1663m (Road ID-333865073)
|
GDP-3
|
sreepur
|
|
0.69
|
|
|
47.21
|
M/S S.S Ent.
|
44.85
|
|
25/06/2018
|
31/12/2018
|
100
|
|
|
10/02/2020
|
|
124
|
GDP-3/Gaz- 39
|
a) Improvement of Uttar Palaid Mandaimour- Eman Ali Road at Ch.00-850m. under Upazila Sreepur, District: Gazipur Road ID no.333865316 Salvage Cost Tk. 13,81,072.00
b) Improvement of Potka-Chawbon Road at Ch.00-1000m. under Upazila Sreepur, District: Gazipur Road ID no.333865075
Package no: GDP-3/Gaz- 39
|
GDP-3
|
sreepur
|
|
1.85
|
|
|
135.36
|
M/S. Almas Construction and Gas Co Pro: Md. Almas Ali, Khandaker Market, Sign Board, National University, Gasipur.
|
128.59
|
|
|
|
100
|
|
|
10/02/2020
|
|
125
|
203868 GDP3/Gazi-2
|
Improvement of Murgir Bazar-Pelaid Road (Ch.00-1000m) (Road ID-333865304).
|
GDP-3
|
sreepur
|
|
1.00
|
|
|
76.95
|
Nawar Trade
|
73.10
|
|
05/09/2018
|
12/05/2019
|
100
|
|
|
01/01/2020
|
|
126
|
GDP- IV/Gaz/KALI/W(R)-117
|
Improvement of Shaturia Sholahati Bridge - Gobindopur via Aliarchala Govt Primary School at Ch. 00 - 630m by HBB & Ch. 630 -1980m by BC
with 3 Nos U-Drain 0.600*0.600m at Ch.580, 720 & 1280m under Kaliakoir Upazilla, District: Gazipur. (Road ID No: 333324041) [Salvage Cost: Tk. 5,03,346.00]
|
GDP-4
|
kaliakoir
|
333324041
|
1.98
|
|
|
160.31
|
"M/S Belal & Brothers "
|
153.90
|
15/10/2019
|
|
30/04/2020
|
35
|
|
|
01/10/2020
|
|
127
|
GDP-IV/ GAZ/KALI/W(R)-123
|
(1). Improvement of Thangarbandh H/o Nazmul Alam - Pailot Mossha Khama via house of Shamsul Haque (X Minister house) at Ch. 00 - 1000m by BC with 2 Nos U-Drain 0.600*0.600m at Ch. 365 & 650m under Kaliakoir Upazilla, District: Gazipur. (Road ID No: 333325316) [Salvage Cost: Tk. 6,34,857.00] (2). Improvement of Bareque Market Kusholnath (Kuwarchala) Near at Mozammel Dukan more - Dubail Mossho Khamar road Via H/O Azim Bari at Ch. 00 - 760m by BC under Kaliakoir Upazilla, District: Gazipur. (Road ID No: 333325318) [Salvage Cost: Tk. 3,71,570.00]
|
GDP-4
|
kaliakoir
|
333325316 333325318
|
1.76
|
|
|
132.43
|
"M/S Belal & Brothers "
|
127.13
|
15/10/2019
|
|
30/04/2020
|
45
|
|
|
01/10/2020
|
|
128
|
GDP-1V/ Gaz/Kali/W(R)-115
|
Improvement of Dubail Bridge to Pakurail Road( Dubail Bridge -Dokkhin Bandhabari Jame Mosque Roadat ch.00-2415m Under Upazila: Kaliakoir, District: Gazipur. (Road ID No: 333324057).
|
GDP-4
|
kaliakoir
|
333324057
|
2.45
|
|
|
259.50
|
Bishal & Sourav Enterprise (JV)
|
282.33
|
12/04/2020
|
|
25/04/2021
|
30
|
|
|
01/10/2020
|
|
129
|
GDP-IV/ GAZ/KALI/ W(R)-120
|
1) Improvement of Dainkini Chandra saw mill road Dainkini GPS Walton Bridge Via Mojibor Chairman bari road by BC ch.00-1130m 2) Improvement of barishabo pacca road Mullukbari Mosque Community Clinic Bariabaha GPS Connecting Road by BC ch.00- 1000m
|
GDP-4
|
kaliakoir
|
333325037 333325314
|
2.13
|
|
|
176.72
|
|
0.00
|
|
|
|
0
|
|
|
01/10/2020
|
|
130
|
GDP-1V/ Gaz/Kali/(R)-337
|
Improvement of Chapair up - Bangla Bazar Via Joina Bazar road (Chapair UP Office puccja road - boro Gobindopur Boura Chala -sath kura Advocate mojibur house road at ch.1500- 3500m
|
GDP-4
|
kaliakoir
|
333323015
|
2.00
|
|
|
279.57
|
M/S Nero & Brothers
|
293.09
|
13/04/2020
|
|
30/04/2021
|
35
|
|
|
01/10/2020
|
|
131
|
GDP-IV/ GAZ/KALI/ W(R)-125
|
Improvement of Gabtoly belaler house- master Bari jame Mosque road at ch.00-750m
|
GDP-4
|
kaliakoir
|
333325323
|
0.75
|
|
|
70.07
|
Maer Doa Enterprise
|
66.57
|
20/02/2020
|
|
26/12/2020
|
80
|
|
|
01/10/2020
|
|
132
|
GDP-IV/GAZ/ KAli/W(R)-342
|
(1) Maintenance of Sawraid GC-mukterpur monir udddin house - Islam sarkar house road at ch.00- 450m (2) Maintenance of Nagori - borkaw road Tiuri panjora road at ch.00- 500m (3) Maintenance of Jamalpur college - medipur (Feritola) road at ch.00-1100m
|
GDP-4
|
kaliganj
|
333345119 333345061 333344106
|
2.05
|
|
100
|
55.00
|
M/S Shapnil Traders
|
52.25
|
16/03/2020
|
|
25/01/2021
|
100
|
52.07
|
100
|
07/11/2022
|
|
133
|
GDP-IV/GAZ/ KAli/W(R)-341
|
(1) Maintanace of Sawraid GC-Muktarpur UP H/Q Road Via taragong Bazar road at ch.2100-3200m , (2) Maintanace of Borogaon Bazar- Bagun road at ch.00-2260m (3) Maintanace of Jangalia Bazar- Janggalia molla bari road at ch.00-600m
|
GDP-4
|
kaliganj
|
333343007 333344074 333345052
|
3.96
|
|
|
128.16
|
M/S. B.N.S Construction
|
121.75
|
27/02/2020
|
|
20/01/2021
|
20
|
|
|
01/10/2020
|
|
134
|
GDP-IV/GAZ/ KAP/W(R)-131
|
(1) Improvement of Dashunarayanpur Pabur Bazar Road by BC at Ch. 800-1250m under Upazila : Kapasia, District : Gazipur. (Road ID No: 333364010), (2) Improvement of Kapasia Sreepur Road (St. from Mollah Bari) to Late Latif and Engineer Mosharraf House Road by BC at Ch. 00- 480m under Upazila : Kapasia, District : Gazipur. (Road ID No: 333365162), (3) Improvement of B.SC Bus Stand Bishnopur GPS Chandalhata Madrasha via Morilla Teke Road by BC at Ch. 00- 425m under Upazila : Kapasia, District : Gazipur. (Road ID No: 333364090), (4) Improvement of Kamergaon Barishabo (St. from Boru Bari Mozid College) Baner River Ghat via Khirati Purbopara GPS, Community Clinic Road by BC at Ch. 00- 480m under Upazila : Kapasia, District : Gazipur. (Road ID No: 333365161), (5) Improvement of Bhuleshwar Chowrasta Barahar Majid Molla Dakhil Madrasha Road by BC at Ch. 00-455m under Upazila : Kapasia, District : Gazipur. (Road ID No: 333365017) [Salvage Cost 6,30,954.00]
|
GDP-4
|
kapasia
|
333364010 333365162 333364090 333365161 333365017
|
2.29
|
|
|
174.59
|
M/S Hamid Builders
|
161.06
|
27/02/2020
|
|
20/01/2021
|
20
|
|
|
04/10/2020
|
|
135
|
GDP-IV/ GAZ/ KAP/ W(R)-10
|
a) Rayed Union H/Q-Barishabo bazar via Kotamani bazar Rd b).Kapasia upazila H/Q (Hospital More )-Rayed GC Via dordoria Bazer road
|
GDP-4
|
kapasia
|
333363023 333365098
|
3.00
|
|
100
|
232.61
|
M/S Bishal Enterprise & M/S. Hamid Builders (JV)
|
214.20
|
31/07/2019
|
|
02/07/2020
|
100
|
212.19
|
100
|
01/10/2020
|
|
136
|
GDP-IV/ GAZ/KAP/ W(R)-132
|
Kamergaon Barishabo Road (St From Boru bari Mozid College) - Baner River Ghat Via Khirati Purbopara GPS, Commiunity Clinic Road.
|
GDP-4
|
kapasia
|
333365161
|
1.00
|
|
30
|
68.97
|
M/S Mim Enterprise
|
65.52
|
04/07/2019
|
|
11/12/2019
|
70
|
17.87
|
30
|
01/10/2020
|
|
137
|
GDP-IV/ GAZ/KAP /W(R)-20
|
Improvement of Deona Kachari Bazar-Borahar Bazar Road at Ch. 1000-1950m.
|
GDP-4
|
kapasia
|
333364047
|
0.95
|
|
100
|
69.95
|
M/S. Mohana Enterprise
|
66.45
|
25/09/2019
|
|
30/12/2019
|
100
|
64.59
|
100
|
01/10/2020
|
|
138
|
GDP-IV/GAZ/ KAP/W(R)-126.
|
(1) Improvement of Kapasia-Vakudia Road. St. From Borun High School to Dist. Judge Solaimans House Road at Ch. 00-1000m. (2) Improvement of Rowtkona Madrasha - Ibrahim Market Road at Ch. 2200- 3600m. (3) Improvement of Kapasia Pabur R&H Road.Rautkona - Pabur Bazar Via Chairman House BRDB Road at Ch. 00- 900m.(Salvage cost TK. 119134.00 )
|
GDP-4
|
kapasia
|
333364066 333365028 333364073
|
3.30
|
|
|
243.13
|
M/S Amzad Traders
|
225.40
|
23/10/2019
|
|
23/10/2019
|
85
|
|
|
01/10/2020
|
|
139
|
GDP-IV/ GAZ/KAP/ W(R)-127
|
(1) Improvement of Shanmania Bazar Gabtoli More - Tetultola More via Kazi bari More Road at Ch. 00-1000m. (2) Improvement of Durgapur Union H/Q- Kamramashuk Senior Madrasha Via Chapat Bazar Rawnat Bazar Fulbaria Natun Bazar Road at Ch. 9770-10970m.
|
GDP-4
|
kapasia
|
333364098 333363011
|
2.20
|
|
25
|
159.30
|
M/S Heaven Enterprise
|
156.78
|
23/10/2019
|
|
30/04/2020
|
70
|
40.00
|
25
|
01/10/2020
|
|
140
|
GDP-IV/ GAZ/KAP/ W(R)-128
|
(1) Improvement of Ballkhalar Bazar - Nalgaon Bazar Rd. St. from Kazi Bari - Pabur kazahazi Connecting Rd.Via H/O Jhangir Road at Ch. 00- 1000m.(2) Improvement of Ranigonj GC - Gazipur Road Kazahaji to Nalgaon Bazar Road at Ch. 2000-3000m. [Salvage cost TK. 486489.00]
|
GDP-4
|
kapasia
|
333365095 333365084
|
2.00
|
|
31
|
144.09
|
"Sretee Enterprise "
|
132.29
|
23/10/2019
|
|
30/03/2020
|
85
|
41.00
|
31
|
01/10/2020
|
|
141
|
GDP-IV/GAZ/ Sree/W(R)-18
|
1) Improvement of Joina Bazar - Gazipur UPC road by BC Ch.3750-5750m 2) Improvement of Gazopur UPC Bashbari Bazar road by BC Ch.00-1000m 3) Improvement of Kawraid UPC Lalpukur bazar via Simultoly Bazar road by BC 8500-10500m
|
GDP-4
|
sreepur
|
333863019 333863020 333863022
|
5.00
|
|
100
|
417.67
|
M/S Kohinoor Enterprise and Combined Development Corporation JV
|
415.00
|
15/07/2020
|
|
30/07/2021
|
100
|
414.25
|
100
|
07/11/2022
|
|
142
|
GDP-IV/ GAZ/SREE/ W(R)-103
|
1)Improvement of Bormi-nandia sangun Road by BC ch.00-1000m Road ID No.333865104Under Upazila Sreepur District Gazipur 2) Improvement of Mitalu Sahjahanpur Road by BC ch. 3250- 4250m Road ID No.333865074 Under Upazila Sreepur District Gazipur 3) Improvement of Izzatpur sahajanpur Bazar via Mosque of suruj mastar bari road ch.990-2100m Road ID No.333865083 Under Upazila Sreepur District Gazipur
|
GDP-4
|
sreepur
|
333865104 333865074 333865083
|
3.11
|
|
|
255.55
|
M/S Kohinoor Enterprise
|
266.48
|
|
|
|
0
|
|
|
05/10/2020
|
|
143
|
GDP-IV/ GAZ/SREE/ W(R)-108
|
1) Improvement of Vitipara Joynarayonpur road by BC 1900-2900m 2) Improvement of joyna Kawraid road karani bari road lacjchatol via natoker Bazar road by BC ch. 00-1000m 3)Improvement of sathkhamair Gulaghat road by BC ch.4000-5000m
|
GDP-4
|
sreepur
|
333865002 333865328 333864008
|
3.00
|
|
|
244.49
|
Mitho Enterprise
|
240.17
|
|
|
|
0
|
|
|
05/10/2020
|
|
144
|
GSIDP/GAZ/DW-11
|
Improvement of Ulukhola Ram Kanai Kali Mondir. Union: Nagari Latitude: 23.74625, Longitude: 90.54783
|
GSIDP
|
kaliganj
|
|
|
|
|
5.00
|
M/S Semul Enterprise
|
4.75
|
|
12/06/2018
|
12/07/2018
|
0
|
|
|
|
|
145
|
GSIDP/GAZ/DW-12
|
Improvement of kaliganj Central Jame Mosque. Union: kaliganj Latitude: 23.92435, Longitude: 90.57387
|
GSIDP
|
kaliganj
|
|
|
|
|
5.01
|
M/S Semul Enterprise
|
4.76
|
|
12/06/2018
|
12/09/2018
|
100
|
|
|
|
|
146
|
GSIDP/GAZ/DW-13
|
Improvement of Royen-Dhunun-Gararia Eidgha Union: Nagori Latitude: 23.89385, Longitude: 90.55092
|
GSIDP
|
kaliganj
|
|
|
|
|
5.00
|
M/S. Maa Enterprise
|
4.75
|
|
24/06/2018
|
17/08/2018
|
100
|
|
|
|
|
147
|
GSIDP/GAZ/DW-14
|
Improvement of Kholapara Famous Eidgha Field. Union: bahadursadi Latitude: 23.93969, Longitude: 90.6092
|
GSIDP
|
kaliganj
|
|
|
|
|
5.00
|
M/S. Maa Enterprise
|
4.75
|
|
14/06/2018
|
13/08/2018
|
100
|
|
|
|
|
148
|
GSIDP/GAZ/DW-15
|
Improvement of Fuldi Eidgha Field. Union: Bokterpur Latitude: 23.97603, Longitude: 90.5526
|
GSIDP
|
kaliganj
|
|
|
|
|
5.00
|
M/S Rahman Brothers.
|
4.75
|
|
13/06/2018
|
13/08/2018
|
100
|
|
|
|
|
149
|
GSIDP/GAZ/DW-1
|
Improvement of Pakurdiya Jame Mosque Union: Toke, Latitude: 24.25775, Longitude: 90.64039
|
GSIDP
|
kapasia
|
|
|
|
|
5.00
|
MS Ma Moni Enterprise
|
4.75
|
|
13/06/2018
|
13/08/2018
|
100
|
|
|
|
|
150
|
GSIDP/GAZ/DW-2
|
Improvement of Singasree Bazar Center Jame Masque Union: Singasree, Latitude: 24.23010, Longitude: 90.54756
|
GSIDP
|
kapasia
|
|
|
|
|
7.83
|
M/S. Morol Enterprise. Prop: Md. Suruj Mondol
|
7.43
|
|
13/06/2018
|
28/08/2018
|
100
|
|
|
|
|
151
|
GSIDP/GAZ/DW-3
|
Improvement of Kapasia Darul Ulum Madrasia Mosque Union: Kapasia, Latitude: 24.11301, Longitude: 90.55607
|
GSIDP
|
kapasia
|
|
|
|
|
5.42
|
Sretee Enterprise
|
5.14
|
|
19/06/2018
|
19/08/2018
|
50
|
|
|
|
|
152
|
GSIDP/GAZ/DW-4
|
Improvement of Fakir Bari Bazar Jame Mosque Union: Korihata, Latitude: 24.12910, Longitude: 90.61840
|
GSIDP
|
kapasia
|
|
|
|
|
5.00
|
Sretee Enterprise
|
4.75
|
|
19/06/2018
|
18/08/2018
|
100
|
|
|
|
|
153
|
GSIDP/GAZ/DW-5
|
Improvement of Aral Bazar Jame Mosque Union: Sonmania, Latitude: 24.11145, Longitude: 90.70139
|
GSIDP
|
kapasia
|
|
|
|
|
5.22
|
Sretee Enterprise
|
4.96
|
|
19/06/2018
|
19/08/2018
|
100
|
|
|
|
|
154
|
GSIDP/GAZ/DW-6
|
Improvement of Gagutiachala Bazar Jame Mosque Union: Gagtia, Latitude: 24.11515, Longitude: 90.68440
|
GSIDP
|
kapasia
|
|
|
|
|
5.07
|
MS Ma Moni Enterprise
|
4.82
|
|
12/06/2018
|
13/08/2018
|
100
|
|
|
|
|
155
|
GSIDP/GAZ/DW-7
|
Improvement of Vakodia Kedrio Jame Masque Union: Chadpur, Latitude: 24.04548, Longitude: 90.57476
|
GSIDP
|
kapasia
|
|
|
|
|
5.00
|
M/S. Maa Enterprise
|
4.75
|
|
14/06/2018
|
17/08/2018
|
50
|
|
|
|
|
156
|
GSIDP/GAZ/DW-8
|
Improvement of Beltoly Bazar Jame Mosque Union: Barishabo, Latitude: 24.19410, Longitude: 90.67818
|
GSIDP
|
kapasia
|
|
|
|
|
5.42
|
M/S M.R Enterprise
|
5.14
|
|
13/06/2018
|
06/05/2019
|
20
|
|
|
|
|
157
|
GSIDP/GAZ/DW-9
|
Improvement of Torgaon Rishipara Shashanghat Roof & Stair (Remening Work) Union: Torgaon, Latitude: 24.16661, Longitude: 90.5825
|
GSIDP
|
kapasia
|
|
|
|
|
5.37
|
M/S M.R Enterprise
|
5.10
|
|
12/06/2018
|
12/08/2018
|
10
|
|
|
|
|
158
|
GSIDP/GAZ/DW-10
|
Improvement of Dordoria Eidgah Fild Union: Rayed, Latitude: 24.18132, Longitude: 90.55518
|
GSIDP
|
kapasia
|
|
|
|
|
5.13
|
M/S M.R Enterprise
|
4.88
|
|
12/06/2018
|
12/08/2018
|
20
|
|
|