1
|
GCC2-01
|
Repairing & Widening of Road by BC from Vanuya to Banomala rail crossing via Joydebpur-Dhirasram, Haydarabad. (Ch-0+00 to Ch-15+259)
|
CGP
|
gazipur-s
|
|
15.26
|
|
|
3335.92
|
RAB-RC(pvt) Ltd & Dawn Corporation(JV)
|
3283.43
|
|
16/11/2017
|
10/11/2018
|
0
|
|
|
|
|
2
|
GCC2-02
|
a. Repairing & Widening of BC road from Maleker bari (Dhaka-Mymanshingh Highway) to Bashan sarak via Ojerpara & Haque Market. (Ch. 00+000 to 6+650 & a link Ch-0.0 to 0+763).
b. Construction of RCC drain along the side of Maleker bari raod (Dhaka-Mymanshingh Highway) to Bashan sarak via Ojerpara & Haque Market. (Ch.0.0 to -1+950),
|
CGP
|
gazipur-s
|
|
12.72
|
|
|
1972.08
|
CDC-NPL(JV)
|
1744.78
|
|
22/06/2017
|
28/08/2018
|
0
|
|
|
|
|
3
|
GCC2-03
|
Repairing & widening of Tongi Vadam road by RCC work (Ch-1+651 to Ch-4+150 & Link-1 road by BC ch-0+100 to Ch-0+950 & Link-2 road by RCC Ch-0+625)
|
CGP
|
gazipur-s
|
|
3.97
|
|
|
993.78
|
MRC-MKH (JV )
|
953.86
|
|
17/04/2017
|
11/04/2018
|
0
|
|
|
|
|
4
|
GCC2-05
|
a) Repairing & Widening of BC Road from Kashimpur to Sreepur connecting road (UP to Mother Textile). (RCC Road Ch. 0+000-4+500)(Link-1 BC Road Ch.0+380-1+277.7) and 530m link-2 RCC road with side drain (Engineer bari road starting from Gacha polasona main road) b) Construction of RCC drain at Kashimpur to Sreepur connecting road (Zitermoor to Mother textile) (Ch.0+000 to 4+500) & Link (Ch.0+000-
|
CGP
|
gazipur-s
|
|
11.82
|
|
|
2337.09
|
MKE-CDC-NPIL Jv
|
2123.94
|
|
29/11/2017
|
23/11/2018
|
0
|
|
|
|
|
5
|
GCC2-06
|
Repairing & Widening of Joybangla road by RCC/BC (Barobari to Maghdubi bypass via Akkas marker) including a Link Road L=8280m
|
CGP
|
gazipur-s
|
|
10.03
|
|
|
1434.04
|
Wahid Construction ltd
|
1349.78
|
|
18/05/2017
|
23/01/2019
|
0
|
|
|
|
|
6
|
GCC2-08
|
Repairing & Widening of BC Road from Shibbari Moor to Zoorpukur & Repairing and Widening of Road from Zoorpukur Moor to Titarkul. (Ch.0+045 to 3+625) & Repairing and widening of BC road from Surabari Rice mill to Kashimpur-Sreepur Road Kazi Market Mr.Malek House via Shaildubi Member Market. Ward No (04 & 05).
|
CGP
|
gazipur-s
|
|
6.75
|
|
|
1105.02
|
NT-MMB(JV)
|
994.51
|
|
31/01/2018
|
26/01/2019
|
0
|
|
|
|
|
7
|
GCC2-09
|
Repairing & Widening of BC road from Dhaka-Pubail road at Markun K2 factory to Harbaid Bazar via Maruka. (Ch. 0+00 to Ch-5+950)
|
CGP
|
gazipur-s
|
|
5.95
|
|
|
921.26
|
MAQ Engineering ltd.
|
882.83
|
|
30/03/2017
|
04/06/2018
|
0
|
|
|
|
|
8
|
GCC2-10
|
Repairing & widening of Khapara road (starting from Dhaka -Mymenshinhg road to Vadam road via Tilargati) (Ch-0+00 to Ch-3+810 ) By RCC Work
|
CGP
|
gazipur-s
|
|
4.36
|
|
|
1237.65
|
Wahid Construction ltd
|
1167.30
|
|
17/04/2017
|
22/12/2018
|
0
|
|
|
|
|
9
|
GCC2-12
|
Repairing & Widening of BC road from Nowzour to Zirani Bazar (starting from Zitermour to west direction up to 6.75. Km). (Ch. 0+00 to 6+750)
|
CGP
|
gazipur-s
|
|
6.75
|
|
|
1210.07
|
NT-RA(JV)
|
1062.33
|
|
14/05/2017
|
30/11/2018
|
0
|
|
|
|
|
10
|
GCC2-04
|
Construction of RCC Drain along side of Tongi Vadam road at Ch. 0+00 to Ch-4+125
|
CGP
|
gazipur-s
|
|
5.22
|
|
|
854.54
|
MRC-MKH(JV)
|
740.58
|
|
26/02/2017
|
21/04/2018
|
0
|
|
|
|
|
11
|
GCC2-07
|
Cosntruction of drain from Dhaka-Mymensingh highway to Dhaka bypass road via Gorib & Gorib factory & vogra bazar. (Ch. 00+00 to 1+400) b) Construction of drain from Mogorkhal to Kadda-Turag Khal along Dhaka By pass road Ch.0+0 to 3+950
|
CGP
|
gazipur-s
|
|
5.18
|
|
|
1500.77
|
MDJ Associates
|
1373.73
|
|
19/05/2017
|
25/06/2018
|
19
|
|
|
|
|
12
|
GCC2-11
|
Construction of RCC Drain along side of Khapara road lasr part (up to Tilargati road ) Ch. 1+375 to Ch-3+810
|
CGP
|
gazipur-s
|
|
3.19
|
|
|
643.76
|
MRC-MKH(JV)
|
575.00
|
|
26/02/2017
|
21/04/2018
|
0
|
|
|
|
|
13
|
GCC2-13
|
Construction of drain along the side of Nowzour to Zirani Bazar (starting from Zitermour to west direction up to 6.75 Km). (Ch. 00+000 to 6+750)
|
CGP
|
gazipur-s
|
|
6.75
|
|
|
1664.38
|
Wahid Construction ltd
|
1572.38
|
|
26/02/2017
|
14/09/2018
|
0
|
|
|
|
|
14
|
GCC2-14
|
Installation of 3 Nos Production Tube wells,Pump house,Necessary electrical work with 10.00km distribution pipe line at Zone-2,4 5 respectively
|
CGP
|
gazipur-s
|
|
|
|
|
1900.21
|
RFL Plastics Limited
|
1595.35
|
|
|
|
0
|
|
|
|
|
15
|
CIB-Gaz-W-121
|
Const. of 584m long PSC Girder Bridge over Shitalakhya river on Kapasia GC-Raniganj GC to Aralia-Lakhpur RHD road at Ch.7500m under Kapasia Upazila District: Gazipur
|
CIBRR
|
kapasia
|
333362002
|
|
584.00
|
100
|
6513.27
|
Navana Construction Ltd. Hous#28/A, Road#83, Gulshan-2, Dhaka-1212
|
422.86
|
15/05/2019
|
09/06/2019
|
27/05/2022
|
100
|
326.25
|
100
|
05/02/2025
|
|
16
|
CIB-Gaz-W-121(b)
|
"Const. of 584m long PSC Girder Bridge over Shitalakhya river on Kapasia GC-Raniganj GC to Aralia-Lakhpur RHD road at Ch.7500m under Kapasia Upazila District: Gazipur
[Road ID: 333362002]. CIB-Gaz-W-121"
|
CIBRR
|
kapasia
|
333362002
|
|
584.00
|
20
|
7167.67
|
M.M. Builders & Engineers Ltd-Confidence Infrastructure Limited JV, House#127 (6th Floor), Road-10, Block-C, Niketon,Gulshan-1, Dhaka-1212.
|
7200.96
|
12/01/2023
|
19/01/2023
|
18/01/2026
|
22
|
1394.22
|
20
|
05/02/2025
|
|
17
|
CRMIDP/GAZ/W-305
|
Amraid Bazar
|
CRMIDP
|
kapasia
|
|
|
|
92
|
295.00
|
"MCJVSTAR Harua, Kishoreganj Sadar, Kishoregonj "
|
266.78
|
21/11/2019
|
10/07/2022
|
15/01/2022
|
99
|
245.84
|
92
|
27/07/2022
|
|
18
|
CRMIDP/GAZ/W-306
|
Kawraid Bazar
|
CRMIDP
|
sreepur
|
|
|
|
66
|
212.00
|
Faisal Mollik JV
|
201.59
|
19/04/2020
|
|
08/02/2022
|
93
|
132.16
|
66
|
27/07/2022
|
|
19
|
GDP-3/Gaz-96
|
Construction of 30.00m Long PC Girder Bridge of Baria UP Office Bandhakhola Kaligonj via Baria Sonarhat Road at Ch.1300m Under Upazila: Sadar, District:Gazipur Road ID: 333303002
|
GDP-3
|
gazipur-s
|
333303002
|
|
30.00
|
|
27922542.00
|
M/S Heaven Enterprise
|
26467694.21
|
06/02/2022
|
|
|
10
|
|
|
28/06/2022
|
|
20
|
GDP-3/Gaz-89
|
Improvement of Harinal (RHD)-Pubail GC via Bari UP Office (St.from Titarkul Bridge) by BC road at Ch. 6350-8087m under Upazila : Sadar Dist: Gazipur Road ID No.333302012 Salvage Cost Tk.32,10,748.00
|
GDP-3
|
gazipur-s
|
333302012
|
1.74
|
|
|
61781929.44
|
M/S.Mostafa Kamal
|
54743622.83
|
31/01/2022
|
|
|
10
|
|
|
22/06/2022
|
|
21
|
GDP-3/Gaz-81
|
Improvement of Pirujali Alimpara Road-Baridhara Corporation Road by BC from Ch. 00-510m under Upazila : Sadar Dist: Gazipur Road ID No.333305117
Salvage Cost. 21,163.00
Package no: GDP-3/Gaz-81
|
GDP-3
|
gazipur-s
|
|
0.51
|
|
|
39.35
|
M/s Setu Enterprise
|
37.38
|
|
|
|
75
|
|
|
10/11/2021
|
|
22
|
GDP-3/Gaz-87
|
Improvement of Bashakoir KNB Bazar- Goalchala GPS via Kombolpara GPS road by BC at Ch. 3730-4620m under Upazila : Kaliakoir Dist: Gazipur Road ID No.333325057
|
GDP-3
|
kaliakoir
|
333325057
|
0.89
|
|
|
8559753.00
|
M/S. FAHIA ENTER PRISE, Pro: Hosen Ahamed, Post- Latifpur, Kaliakoir-1750, Powroshava, Kaliakoir, Gazipur
|
8131765.00
|
24/11/2021
|
|
|
40
|
|
|
28/06/2022
|
|
23
|
GDP-3/Gaz-88
|
Improvement of Fulbaria UP-Paburiachala Bazar road by BC at Ch. 5125-6000m under Upazila : Kaliakoir Dist: Gazipur Road ID No.333323003
|
GDP-3
|
kaliakoir
|
333323003
|
0.88
|
|
|
7793105.00
|
M/S Khan Revive, Pro: Md. Moshiur Rahman, 795, Begum Rokeya Saroni, Kazi Para, Mirpur-Dhaka
|
7403449.75
|
15/11/2021
|
|
|
70
|
|
|
28/06/2022
|
|
24
|
GDP-3/Gaz-79
|
Improvement of Bahadurshadi –Soiladi via Jamalpur Road by BC from Ch. 00-1995m under Union: Bahadurshadi/Jamalpur Upazila : Kaliganj Dist: Gazipur Road ID No.333344007
Salvage amount Tk. 8,60,989.00 Package no: GDP-3/Gaz-79
|
GDP-3
|
kaliakoir
|
|
2.00
|
|
|
170.06
|
M/S Amzad Traders
|
159.13
|
|
|
|
100
|
|
|
20/06/2022
|
|
25
|
GDP-3/Gaz-86
|
Improvement of Rayerchala-Golachipa school Road by BC at Ch. 1250-2250m under Upazila : Kaliakoir Dist: Gazipur Road ID No.333324042 Salvage Cost Tk 9,51,563.00
|
GDP-3
|
kaliakoir
|
333324042
|
1.00
|
|
|
9368294.00
|
Ahad Nur Enterprise, Pro: Md. Sheikh Aziz, Post- Kaliakoir, Kaliakoir Gazipur
|
8899879.00
|
24/11/2021
|
|
|
15
|
|
|
20/06/2022
|
|
26
|
235008 GDP-3/GAZ-(Reh)-24
|
a) Maintenance Of Kanchanpur bazar (R&H) Hatkhola bazar Via Rashidpur beelbaria ajgana Village road From Ch.0.00-4000m under Kaliakoir Upazila District :Gazipur Road ID No 333324014 b) Maintenance Of Muradpur Sakassor road From Ch.0.00-0.800kmm unde
|
GDP-3
|
kaliakoir
|
|
4.80
|
|
|
159.09
|
|
165.54
|
|
|
|
100
|
|
|
19/06/2022
|
|
27
|
GDP-3/Gaz-32
|
5.a) Improvement Of Talchala Bazar -Fulbaria Up Road (Fulbaria-Talchala Bazar)at Ch.3000-5050m.Under Kaliakoir Upazila District>GazipurRoad Id No. 333323004 b) Improvement Of NHW Janata Bank -Mouchak Railw
|
GDP-3
|
kaliakoir
|
|
3.87
|
|
|
295.15
|
M/S D.A Enterprise
|
274.54
|
|
|
|
80
|
|
|
19/06/2022
|
|
28
|
Package no: GDP-3/Gaz-40
|
Constuction of 63m Long RCC Girder Bridge of Benupur- Dhantara road at Ch.0+450km. over Bongshai River under Union: Dhalzora, Upazila: Kaliakoir, District: Gazipur Road ID no.333324058
Package no: GDP-3/Gaz-40
|
GDP-3
|
kaliakoir
|
|
|
63.00
|
|
410.52
|
M/s. Durga Enterprise, Pro: Shamol Chandra Saha, Dewangonj Bazar, Jamalpur
|
384.31
|
|
|
|
100
|
|
|
19/06/2022
|
|
29
|
Package no: GDP-3/Gaz- 49
|
Improvement of Kundaghata-Naloa Bazar via Golua G.P.S (Kundaghata village-Naloa bazar) Road at Ch.750-2850m. under Upazila Kaliakoir, District: Gazipur Road ID no.333324001
Salvage amount Tk. 17,16,939.00
Package no: GDP-3/Gaz- 49
|
GDP-3
|
kaliakoir
|
|
2.10
|
|
|
193.49
|
M/s. D A Enterprise, Pro: Ezarder Mukitur Rahaman, 554, West Nakhal Para, Shaheenbag, Dhaka-1215
|
181.33
|
|
|
|
65
|
|
|
19/06/2022
|
|
30
|
Package no: GDP-3/Gaz- 54
|
Improvement of Kaliakoir Dhamrai road near Khan para- Nalua Mosque Road ( Boliadi- Chandabaha) Road at Ch. 00-1465m under Union: Atabah, Upazila : Kaliakoir, Dist: Gazipur Road ID No.333324108
Salvage Cost. 5,76,047.00
Package no: GDP-3/Gaz- 54
|
GDP-3
|
kaliakoir
|
|
1.47
|
|
|
137.53
|
M/S. M.M Traders, Pro: Md. Abdur Razzak, Ward No: 02, Area: Latifpur, Kaliakair, Gazipur.
|
130.66
|
|
|
|
70
|
|
|
19/06/2022
|
|
31
|
Package no: GDP-3/Gaz-41
|
Constuction of 63m Long RCC Girder Bridge on Boraibari G.C- Boali UP road over Norakhali River at Ch.3790m. under Upazila Kaliakoir, District: Gazipur Road ID no.333322012
Package no: GDP-3/Gaz-41
|
GDP-3
|
kaliakoir
|
|
|
63.00
|
|
478.95
|
M/S Durga Enterprise, Pro: Shamol Chandra Saha, Dewangonj Bazar, Jamalpur
|
458.23
|
28/10/2020
|
|
28/09/2020
|
70
|
|
|
19/06/2022
|
|
32
|
Package no: GDP-3/Gaz-55
|
Improvement of Mazukhan Bazar Vannara Bazar Road from Ch. 00-850m under Upazila : Kaliakoir Dist: Gazipur Road ID No.333325029
Salvage Cost. 14,81,338.00
Package no: GDP-3/Gaz-55
|
GDP-3
|
kaliakoir
|
|
0.85
|
|
|
87.32
|
Geonex Builders, Pro: Mr. S.M. Jahidul Islam, Kaliakoir, Gazipur
|
82.95
|
17/11/2019
|
|
30/08/2019
|
100
|
|
|
19/06/2022
|
|
33
|
GDP-3/Gaz-65
|
Construction of 92.00m Long RCC Girder Bridge on Gachbari-Nalua Amtoli Mozidchala Road over Goalia River at ch:3450m Under Upazila: Kaliakoir, District:Gazipur Road ID: 333325155. GDP-3/Gaz-65
|
GDP-3
|
kaliakoir
|
|
|
92.00
|
|
757.70
|
Orient Trade
|
825.68
|
|
|
|
95
|
|
|
19/06/2022
|
|
34
|
GDP-3/Gaz-82
|
Improvement of Kaliakoir -Fulbaria R&H (Borachala) –Baghair Road by BC from Ch. 00-1500m under Upazila : Kaliakoir Dist: Gazipur Road ID No.333324078.
Package no: GDP-3/Gaz-82
|
GDP-3
|
kaliakoir
|
|
1.50
|
|
|
125.48
|
M/S Morol Enterprise
|
119.21
|
|
|
|
100
|
|
|
19/06/2022
|
|
35
|
GDP-3/Gaz-78
|
Improvement of NHW Mouchak-Fulbaria (GC) (Mojid Market) – Turag river ghat via misir Ali High School & Collage Road by BC from Ch. 00-1000m under Upazila : Kaliakoir Dist: Gazipur Road ID No.333324118
Salvage Cost. 7,80,581.00
Package no: GDP-3/Gaz-78
|
GDP-3
|
kaliakoir
|
|
1.00
|
|
|
104.18
|
Khan Builders,
|
98.97
|
|
|
|
100
|
|
|
19/06/2022
|
|
36
|
GDP-3/Gaz-80
|
Improvement of Bashakoir KNB Bazar- Goalchala GPS via Kombolpara GPS Road from Ch. 00-3730m under Union: Fulbaria Upazila : Kaliakoir, Dist: Gazipur Road ID No.333325057
Salvage amount Tk. 12,52,469.00 Package no: GDP-3/Gaz-80
|
GDP-3
|
kaliakoir
|
|
3.73
|
|
|
376.17
|
AMT STAR JV
|
372.28
|
|
|
|
100
|
|
|
19/06/2022
|
|
37
|
GDP-3/Gaz- 56
|
Improvement of K. N. B bazar- Janpara GPS road from Ch. 00-2000m under Union: Fulbaria, Upazila : Kaliakoir, Dist: Gazipur Road ID No.333324099
Package no: GDP-3/Gaz- 56
|
GDP-3
|
kaliakoir
|
|
2.00
|
|
|
152.17
|
AMT STAR JV,
|
158.77
|
|
|
|
100
|
|
|
11/10/2021
|
|
38
|
GDP-3/Gaz- 57
|
Improvement of Solonga-Saldah para Road from Ch. 00-3000m under Union: Fulbaria, Upazila : Kaliakoir, Dist: Gazipur. Road ID No.333324012
Salvage amount Tk. 24,31,844.00
Package no: GDP-3/Gaz- 57
|
GDP-3
|
kaliakoir
|
|
3.00
|
|
|
301.17
|
AMT STAR JV,
|
314.86
|
|
|
|
100
|
|
|
11/10/2021
|
|
39
|
Package no: GDP-3/Gaz- 37
|
Improvement of NHW, Ansar Academy – Habibpur Road at Ch.1100-2000m. under Upazila Kaliakoir, District: Gazipur Road ID no.333325191
Salvage Cost. 5,91,022.00
Package no: GDP-3/Gaz- 37
|
GDP-3
|
kaliakoir
|
|
0.90
|
|
|
68.91
|
M/S SHANAJ INTERNATIONAL, Pro: KABIR AHAMED KHAN, 795, (4TH FLOOR), KAZIPARA, MIRPUR, DHAKA-1216
|
65.47
|
|
|
|
100
|
|
|
04/02/2021
|
|
40
|
GDP-3/Gaz Market-59
|
Improvement of Fulbaria GC Under Upazila: Kaliakoir, District: Gazipur.
Package no: GDP-3/Gaz
Market-59
|
GDP-3
|
kaliakoir
|
|
|
|
|
15.00
|
CHOTUSKHON ENTERPRISE, Pro:MD.
|
14.25
|
|
|
|
100
|
100.00
|
|
09/08/2020
|
|
41
|
GDP-3/Gaz-31
|
4.a) Improvement Of R&H Haburchala Bottola -Nalua Bazar Via Gosai Bari Gps Road at Ch. 1000-2000m Under Kaliakoir Upazila District Gazipur.Road id no.333324127 b) mprovement Of Sirajpur - Kathchura (Shop Of Mofazzal -R&H -Biman Bihari Kalimondir )Road
|
GDP-3
|
kaliakoir
|
|
2.00
|
|
|
158.16
|
M/S Nurzaahan Enterprise
|
150.25
|
|
|
|
100
|
|
|
02/03/2020
|
|
42
|
GDP-3/Gaz- 43
|
Improvement of Sakashor- Akulichala Road (Sakashor Konabari GC- Akulichla Road) at Ch. 00-1000m under Upazila Kaliakoir, District: Gazipur Road ID no.333325076
Package no: GDP-3/Gaz- 43
|
GDP-3
|
kaliakoir
|
|
1.00
|
|
|
82.16
|
M/S. Jui Enterprise, Pro: Md. Jaynal Abdin, Jugitala, PS. BRRI, Joydebpur, Gazipur.
|
78.05
|
|
|
|
100
|
|
|
10/02/2020
|
|
43
|
235007 GDP-3/GAZ-(Reh)-23
|
a) Maintenance Of Ramchandropur bazar - Boheratoli School Road From Ch. 0.00-1860m Under Upazila District :Gazipur Road ID No 333324064. b) Maintenance Of kaliakoir GCCR Goalchala Road From Ch.0.00-0.468Km
|
GDP-3
|
kaliakoir
|
|
2.33
|
|
|
109.54
|
|
104.07
|
|
|
|
100
|
|
|
08/07/2019
|
|
44
|
182013 GDP-3/GAZ-(Reh)-3
|
Maintenance work of Ramchandrapur Bazar-Fulbaria UP Road (Ch.0+000-2+100km) (Road ID-333323010)
|
GDP-3
|
kaliakoir
|
|
2.10
|
|
|
55.61
|
M/S R & R Ent
|
52.83
|
|
04/06/2018
|
30/10/2018
|
100
|
|
|
|
|
45
|
GDP-3/Gaz-106
|
Improvement of Jangalia UP- Alauddin Tek Bazar road via Bonna GPS by BC at ch.1900-2865m under Upazila Kaligonj Dist.Gazipur Rooad ID No.333343019
|
GDP-3
|
kaliganj
|
333343019
|
0.97
|
|
|
100.61
|
Gorai Engineering and Construction Compani Limited
|
95.58
|
28/04/2022
|
|
|
0
|
|
|
28/06/2022
|
|
46
|
GDP-3/Gaz-107
|
Improvement of Rayerdia- Kolun road by BC at ch.00-850m under Upazila Kaligonj Dist.Gazipur Rooad ID No.333344086
|
GDP-3
|
kaliganj
|
333344086
|
0.85
|
|
|
93.01
|
Sinha Enterprise
|
88.36
|
|
|
|
0
|
|
|
28/06/2022
|
|
47
|
GDP-3/ Gaz-Reh-77
|
Maintenance of Tumulia UP-Tek Manikpur Bazar Road Via Chuarikhola Bazar Road at Ch.00-1200m under Upazila : Kaliganj Dist: Gazipur Road ID No.333343005 Salvage amount tk.1,70,538.00
|
GDP-3
|
kaliganj
|
333343005
|
1.20
|
|
|
7498024.00
|
M/S Hazi Traders
|
7123127.00
|
11/06/2020
|
|
|
100
|
|
|
20/06/2022
|
|
48
|
GDP-3/Gaz- Reh-58
|
a) Maintenance of Nagori UP H/Q – New Nawtana Bazar RHD Rd. Via Petrobangla (Kamta Gas Field) Road at Ch. 900-1900m under Upazila : Kaliganj Dist: Gazipur Road ID No.333343006
b) Maintenance of Tumuli Mission –Nagori Road at Point of Shop of Monjur – Chorakhola Non govt. Primary School (Tumuli-Nagori road Beribandth at Shop of Suraj- H/o Chandu Via Chorakhola Non govt. Primary School Road at Ch. 00-600m under Upazila : Kaliganj Dist: Gazipur Road ID No.333344124
Salvage Cost. 95,479.00
Package no: GDP-3/Gaz- Reh-58
|
GDP-3
|
kaliganj
|
|
1.60
|
|
|
116.83
|
M/S MEEM TRADEIMPEX, Pro:NAHID AHMED, BOALI, KALIGANJ, GAZIPUR
|
110.98
|
|
|
|
100
|
|
|
19/06/2022
|
|
49
|
Package no: GDP-3/Gaz-72
|
Improvement of Mazu Khan – Vatira Bazar Road from Ch. 500-1280m under Union: Upazila : Boktarpur Kaliganj Dist: Gazipur Road ID No.333344056
Salvage Cost. 14,15,997.00
Package no: GDP-3/Gaz-72
|
GDP-3
|
kaliganj
|
|
0.78
|
|
|
70.91
|
M/S MEEM TRADEIMPEX, Pro: MD. NAHID AHMED, BOALI, KALIGANJ, GAZIPUR
|
67.37
|
12/04/2020
|
|
31/01/2021
|
100
|
|
|
19/06/2022
|
|
50
|
Package no: GDP-3/Gaz-73
|
Improvement of Narun P/School-Batenhati & Narun Bazar Pucca Road- Narun Post Office Road from Ch. 500-1450m under Uniong: Jangalia, Upazila : Kaliganj Dist: Gazipur Road ID No.333345009
Salvage Cost. 5,43,076.00
Package no: GDP-3/Gaz-73
|
GDP-3
|
kaliganj
|
|
0.95
|
|
|
79.59
|
Masud Construction, Pro: Sheikh Mohammad Masud, Gazipur Sadar, Gazipur
|
75.61
|
12/04/2020
|
|
31/01/2021
|
60
|
|
|
19/06/2022
|
|
51
|
GDP-3/Gaz-71
|
Improvement of Sharsarchala Mistri Bari-Boraid Road from Ch. 1000-3000m under Upazila : Kaliganj Dist: Gazipur Road ID No.333344012
Salvage amount Tk. 9,21,018.00
Package no: GDP-3/Gaz-71
|
GDP-3
|
kaliganj
|
|
2.00
|
|
|
176.76
|
M/S Heaven Enterprise
|
170.21
|
|
|
|
55
|
|
|
19/06/2022
|
|
52
|
Package no: GDP-3/Gaz-Reh- 60
|
Maintenance of RK Jute Mill Uttar Gow Tatibazar Road at Ch.00-1000m under Upazila : Kaliganj Dist: Gazipur Road ID No.333344058
Package no: GDP-3/Gaz-Reh-60
|
GDP-3
|
kaliganj
|
|
1.00
|
|
|
30.86
|
M/S MEEM TRADEIMPEX, Pro: MD. NAHID AHMED, BOALI, KALIGANJ, GAZIPUR
|
29.32
|
10/02/2020
|
|
20/07/2020
|
100
|
|
|
07/02/2021
|
|
53
|
235010GDP-3/Gaz-(Reh)-26
|
a) maintenance Of Khalpara police capm Eidgha ch.0+00-1+125km.Under Kaligonj Upazila District:Gazipur Road ID no 33334405. b) maintenance Of Chupair -kapaisa Rd Ch. 0+00-1+430km Under Kaligonj Upazila
|
GDP-3
|
kaliganj
|
|
1.26
|
|
|
85.38
|
M/S Vhuiyan Builders
|
81.11
|
14/01/2019
|
|
|
100
|
|
|
04/11/2020
|
|
54
|
GDP-3/Gaz-(Reh)-34
|
1.a) Maintenance Of Dolian Bazar BY PASS.Road At Ch.00-305m, Under Kaligong Uapzilla District. Gazipur.Road Id No.333344051
|
GDP-3
|
kaliganj
|
|
0.31
|
|
|
54.49
|
M/S Tehcno Construction
|
51.76
|
|
|
|
100
|
|
|
08/09/2020
|
|
55
|
GDP-3/Gaz-Market-66
|
Rehabilitation of Borgaon Hat Upazila: Kaliganj, District: Gazipur
Package no: GDP-3/Gaz-Market-66
|
GDP-3
|
kaliganj
|
|
|
|
|
14.97
|
SHAHIDULLAH ENTERPRISE
|
14.22
|
|
|
|
100
|
|
|
09/08/2020
|
|
56
|
Package no: GDP-3/Gaz- 38
|
2. a) Improvement of Mukterpur UP – Akota Ferry Ghat Bazar Road via Kalihashi Road at Ch.800-1500m. under Upazila Kaliganj, District: Gazipur Road ID no.333343021
b) Improvement of Showraid GC- Dolon Bzar Road via Borogaon Bazar Road at Ch.2250-3920m. under Upazila Kaliganj, District: Gazipur Road ID no.333343008 Salvage Cost Tk. 5,56,293.00
c) Improvement of Ulukhola – Termokh Bridge Jelepara Dineshbari via Karaihati Monshibari Mosjid Road at Ch.00-1250m. under Upazila Kaliganj, District: Gazipur Road ID no.333345176
Salvage Cost Tk. 1,26,331.00
Package no: GDP-3/Gaz- 38
|
GDP-3
|
kaliganj
|
|
3.62
|
|
|
311.04
|
M/S. Amzad Traders
|
298.18
|
|
|
|
100
|
|
|
01/01/2020
|
|
57
|
GDP-3/Gaz-Reh-27
|
Maintenance Of Bhaiasuti-Bhat Para (Bangla) Road at Ch. 00-1150m Under Kaligonj Upazila, District.Gazipur.Road Id No. 333344022
|
GDP-3
|
kaliganj
|
|
1.15
|
|
|
39.25
|
M/S Nahid Enterprise
|
37.28
|
|
|
|
100
|
|
|
04/12/2019
|
|
58
|
189819 GDP-3/Gaz-15
|
Improvement of Azmotpur Morol Bari Pacca road to Tilsuniya Khideertack Road Ch.0+00-1+500km (Road ID-333345177)
|
GDP-3
|
kaliganj
|
|
1.50
|
|
|
106.85
|
M/S Mukul Ent.
|
101.51
|
|
25/06/2018
|
31/03/2019
|
100
|
|
|
09/10/2019
|
|
59
|
235009GDP-3/Gaz-(Reh)-25
|
a) maintenance Of Showraid GC -Dolon bazar Rd via Borogaon Bazar .Ch.4+060-5+150km Under Kaligonj Upazila District .Gazipur Road ID no 333343008. b) maintenance Of Tumulia Mishion-Piprar Shair Rd.Ch.00-750m.
|
GDP-3
|
kaliganj
|
|
2.35
|
|
|
64.18
|
M/S Amzad Traders
|
60.97
|
|
|
|
100
|
|
|
08/07/2019
|
|
60
|
191526 GDP-3/Gaz-8
|
Improvement of Sanmania Etimkhana Madrasha-Gabtoli More Via Mollah Bari Road (Ch.00-1040m) (Road ID-333364235)
|
GDP-3
|
kapasia
|
|
1.04
|
|
|
79.93
|
M/S MERCY Enterprise
|
75.93
|
|
|
|
100
|
|
|
28/06/2022
|
|
61
|
GDP-3/ Gaz-85
|
Improvement of Kapasia Kaliganj RHD Road Osinir Bari-Rajabari GC- Chandpur GC road by BC at Ch. 00-1500m under Upazila : Kapasia Dist: Gazipur Road ID No.333364137
|
GDP-3
|
kapasia
|
333364137
|
1.50
|
|
|
12617559.00
|
M/S Tarim Enterprise
|
11986681.50
|
29/09/2021
|
|
|
45
|
|
|
28/06/2022
|
|
62
|
GDP-3/Gaz-93
|
Improvement of Dhandia Kalibari–Bhabani Ghat (Dhandia Kalibari St. from BC road – Hijolia Pacca) Road by BC at Ch. 00-930m under Upazila : Kapasia Dist: Gazipur Road ID No.333365259
Salvage Cost BDT: 56,944.00
Package no: GDP-3/Gaz-93
|
GDP-3
|
kapasia
|
333365259
|
0.93
|
|
|
8709045.00
|
Aamaira Construction & Co.
|
8273592.00
|
02/01/2022
|
|
|
60
|
|
|
28/06/2022
|
|
63
|
GDP-3/Gaz-94
|
Improvement of Rampur High School – Pirozpur Dakhin Para Via Sikder Bari Jame Mosque Road by BC at Ch. 00-600m under Upazila : Kapasia Dist: Gazipur Road ID No.333365031
Salvage Cost BDT: 5,47,517.00
Package no: GDP-3/Gaz-94
|
GDP-3
|
kapasia
|
333365031
|
0.60
|
|
|
5817641.00
|
MS M.R. ENTERPRISE
|
5526758.00
|
05/01/2022
|
|
|
40
|
|
|
28/06/2022
|
|
64
|
GDP-3/Gaz-97
|
Improvement of Aral Hatirdia R&H Road Shabeb Ali Market – Aral Kamar Bari Via Tetultala more ( Aral Profulla bari Pucca Road Connecting – Mirza Nagar Girls high School-Mirzanagar Bazar Pucca Road by BC at Ch. 0.00-3000.00m under Upazila : Kapasia Dist: Gazipur Road ID No.333364097 Salvage Cost: BDT. 8,08,385.00
Package no: GDP-3/Gaz-97
|
GDP-3
|
kapasia
|
333364097
|
3.00
|
|
|
23861640.00
|
m/s ibrahim construction
|
21475476.00
|
22/02/2022
|
|
|
25
|
|
|
28/06/2022
|
|
65
|
GDP-3/Gaz-99
|
Improvement of Torgoan Purbopara Eidgah Jamee Mosque –Nobipur (Noradia) Road by BC at Ch. 00-1350.00m under Upazila : Kapasia Dist: Gazipur Road ID No.333365216
|
GDP-3
|
kapasia
|
333365216
|
1.35
|
|
|
12075339.00
|
M/S. S. ALAM CONSTRUCTION
|
11471572.00
|
24/01/2022
|
|
|
40
|
|
|
28/06/2022
|
|
66
|
GDP-3/Gaz-101
|
Improvement Sanmania lta Khola to Mendir Baper Bari via Boro Kandha (Kaliabo Hafizia Madrasha Near of Paca Road – Dokhingha- Kalibo Dakhil Madrasha Near of Paca Road) by BC at Ch. 00-2100.00m under Upazila : Kapasia Dist: Gazipur Road ID No.333365232
Salvage Cost BDT: 3,13,417.00
Package no: GDP-3/Gaz-101
|
GDP-3
|
kapasia
|
333365232
|
2.10
|
|
|
17644938.00
|
M/S MAHMUD ENTERPRISE
|
16762691.00
|
27/01/2022
|
|
|
55
|
|
|
28/06/2022
|
|
67
|
GDP-3/Gaz-105
|
Construction of 30.00m Long PSC Girder Bridge on Moysa Dhamna Bazar -Charpara road at ch.24m Under Upazila Kapasia,District.gazipur Road ID No.333364036
|
GDP-3
|
kapasia
|
333364036
|
|
30.00
|
|
272.25
|
Faridpur Jannat Construction
|
254.10
|
18/04/2022
|
|
|
0
|
|
|
28/06/2022
|
|
68
|
GDP-3/Gaz-95
|
Improvement of Durgapur Union H/Q Kamramashuk Siniar Madrasha Road (Abdullah House) – Chatarbag Bus Stand (Madrasha Road (Abdullah House) Chatarbag Bus Stand) Road by BC at Ch. 850-1400m under Upazila : Kapasia Dist: Gazipur Road ID No.333365071
Salvage Cost BDT: 6,10,864.00
Package no: GDP-3/Gaz-95
|
GDP-3
|
kapasia
|
333365071
|
0.55
|
|
|
4529764.00
|
M/S Jalil Enterprise
|
4303275.00
|
05/01/2022
|
|
|
40
|
|
|
22/06/2022
|
|
69
|
GDP-3/Gaz-98
|
Improvement of Dakhingaon RHD Road Ramij Uddin Mkt-Dakhingaon Hazi Bari Mosque RHD Road.( Dokhin Gha Hazibari Mosque ( Ebrahim Prodhan) Near of Paca Road-Dokhin Gha Kaliar Dakhil Madrasha to Misu Mistre House Road) Road by BC at Ch. 00-838.00m under Upazila : Kapasia Dist: Gazipur Road ID No.333365256
Salvage Cost BDT: 42,610.00
Package no: GDP-3/Gaz-98
|
GDP-3
|
kapasia
|
333365256
|
0.84
|
|
|
9445199.00
|
M/s Setu Enterprise
|
8972939.00
|
31/01/2022
|
|
|
25
|
|
|
22/06/2022
|
|
70
|
GDP-3/Gaz-100
|
Improvement of Barishabo Nurar Pul-Banar River Purchim Side Batna LGED Pacca Road by BC at Ch. 0.00-2000.00m under Upazila : Kapasia Dist: Gazipur Road ID No.333365346
Salvage Cost BDT: 3,24,014.00
Package no: GDP-3/Gaz-100
|
GDP-3
|
kapasia
|
333365346
|
2.00
|
|
|
16379384.00
|
M/S. Jaman Enterprise
|
15560414.00
|
25/01/2022
|
|
|
5
|
|
|
22/06/2022
|
|
71
|
GDP-3/Gaz-102
|
Construction of 20.00m Long RCC Girder Bridge on Taragonj Bazar-Ghatkuri Bazar Road at Ch.3000m Under Upazila: Kapasia, District: Gazipur Road ID: 333362011
Salvage Cost: BDT. 82,194.00
Package no: GDP-3/Gaz-102
|
GDP-3
|
kapasia
|
333362011
|
|
20.00
|
|
23962599.00
|
M/S Musfiqur Rahman (Kanchan)
|
21566339.00
|
24/02/2022
|
|
|
5
|
|
|
22/06/2022
|
|
72
|
GDP-3/Gaz-103
|
Construction of 20.00m Long RCC Girder Bridge on Kapasia GC-Kaligonj GC Road at Ch.9500m Under Upazila: Kapasia, District: Gazipur Road ID: 333362004
Salvage Cost: BDT. 79,816.00
Package no: GDP-3/Gaz-103
|
GDP-3
|
kapasia
|
333362004
|
|
20.00
|
|
21079791.00
|
M/S Musfiqur Rahman (Kanchan)
|
18971811.00
|
24/02/2022
|
|
|
5
|
|
|
22/06/2022
|
|
73
|
GDP-3/Gaz-104
|
Construction of 25.00m Long PSC Girder Bridge on Rayed UP H/Q – Dulalpur Bazar via Moision Miar Bazar Road at Ch.10700km Under Upazila: Kapasia, District: Gazipur Road ID: 333363001
Salvage Cost: BDT. 64,407.00
Package no: GDP-3/Gaz-104
|
GDP-3
|
kapasia
|
333363001
|
|
25.00
|
10
|
22938145.00
|
M/S Musfiqur Rahman (Kanchan)
|
20644330.00
|
24/02/2022
|
|
|
10
|
|
10
|
22/06/2022
|
|
74
|
189816 GDP-3/Gaz-12
|
Improvement of Aral to Aralia Pucca Road (H/Q Awal)-Kamargaon School via Zab Village road at (Ch.1200-2200m) (Road ID-333365042)
|
GDP-3
|
kapasia
|
|
1.00
|
|
|
65.51
|
M/S MR Ent.
|
62.23
|
|
05/06/2018
|
12/11/2018
|
100
|
|
|
19/06/2022
|
|
75
|
225723 GDP-3/Gaz-21
|
a) Improvement of Toke Union H/Q -(Toke GC More )- Hariadi Kheya Ghata Via Shohagpur Bazar Road Ulusara Bazar at Ch.4400-6350 m And Ch. 8850-9650m. Under Upazila Kapasia, District Gazipur.Road ID no333363018.
|
GDP-3
|
kapasia
|
|
2.95
|
|
|
253.38
|
Sreete Enterprise
|
250.07
|
|
|
|
100
|
|
|
19/06/2022
|
|
76
|
Package no: GDP-3/Gaz- 47
|
Improvement of Toke Union H/Q- Pachua Bazar Road at Ch. 3300-5700m under Union: Toke, Upazila : Kapasia, Dist: Gazipur Road ID No.333363020
Salvage Cost Tk. 10,62,921.00
Package no: GDP-3/Gaz- 47
|
GDP-3
|
kapasia
|
|
2.40
|
|
|
179.81
|
m.s. belal & brothers, Pro: Md. billal Hossain, House-407, Road-29, New DOHS, Mohakhali, Dhaka-1206.
|
170.82
|
|
|
|
100
|
|
|
10/11/2021
|
|
77
|
GDP-3/Gaz-28
|
1.a) Improvement Of Aral Bazar -Aralia R&H Road (St. From Mia Para GPS )- Kamargoan Bazar Road At Ch. 2000-3670m. Under Upazila Kapasia District.Gazipur.Road Id No. 333364074. b) Improvement Of Chandpur Ba
|
GDP-3
|
kapasia
|
|
4.77
|
|
|
344.54
|
M/S shanta Enterprise
|
342.47
|
|
|
|
100
|
|
|
11/10/2021
|
|
78
|
GDP-3/Gaz-35
|
Construction of 48.00m Long RCC Girder Bridge on Manik Bazar Charmonohordi -Sonmania Bazar Road at Ch.1150, Under Kapasia Upaziala ,District:Gazipur Road Id no.333365114
|
GDP-3
|
kapasia
|
|
|
48.00
|
|
342.47
|
RHB JV
|
335.81
|
|
|
|
100
|
|
|
29/08/2021
|
|
79
|
Package no: GDP-3/Gaz- 48
|
Construction of 20m Long RCC Girder Bridge on Deona Kachair Bazar – Borhor Bazar Road at Ch.00m Under Upazila: Kapasia, District: Gazipur Road ID No. 333364047
Package no: GDP-3/Gaz- 48
|
GDP-3
|
kapasia
|
|
|
20.00
|
|
161.28
|
Bachchu Hamid JVCA, Kapasia, Gazipur
|
150.18
|
|
|
|
100
|
14836353.00
|
|
29/08/2021
|
|
80
|
214126 GDP-3/Gaz-19
|
a)Improvement of Aral bazar -Aralia R&H Road (St. From Mia para GPS )- Kamargoan Bazar Road. at (Ch.1000-2000m) (Road ID-333364074 b)Improvement of Bulesshor khalpar Pacca Rasta Bala Banga bazar Via Mofiz chairman h
|
GDP-3
|
kapasia
|
|
2.80
|
|
|
193.36
|
M/S Sharafat Ent.
|
183.69
|
|
28/10/2018
|
04/09/2019
|
100
|
|
|
08/10/2020
|
|
81
|
Package no: GDP-3/Gaz- 36
|
1. a) Improvement of Dhakhingoan goni Market- Aral-Hatirdia Road via Shahiddullah bari( Dhakhingoan goni Market(St.from RHD Road) –Aral- Hatirdia Road) at Ch. 00-1500m. under Upazila Kapasia, District: Gazipur Road ID no 333364009(333365233)
b) Improvement of Barjana-Pabur Bazar Road at Ch.4360-5500m. under Upazila Kapasia, District: Gazipur Road ID no.333364020
c) Improvement of Ballkhalar Bazar-Moragangi Road at Ch.3240-4740m. under Upazila Kapasia District: Gazipur Road ID no.333364002
Salvage Cost Tk. 4,58,765.00
Package no: GDP-3/Gaz- 36
|
GDP-3
|
kapasia
|
|
4.14
|
|
|
303.09
|
M/S. Shanta Enterprise
|
292.17
|
|
|
|
100
|
|
|
08/10/2020
|
|
82
|
GDP-3/Gaz-29
|
2.a) Improvement Of Rayed Union H/Q -Dulalpur Bazar Via Maison Miar Bazar Road at Ch.7600-9600m. Under Upazila Kapasia,District.Gazipur.Road ID No.333363001. b) Improvement Of Rayed Union H/Q -Dulalpur Bazar Via Maison Mi
|
GDP-3
|
kapasia
|
|
2.95
|
|
|
222.06
|
M/S Bishal Khurshid
|
218.78
|
|
|
|
100
|
|
|
09/08/2020
|
|
83
|
Package no: GDP-3/Gaz- 45
|
Improvement of Kapasia GC (Risibari More)-Gee Ghat (RHD) via Equria Bazar Road at Ch. 7700-9850m under Union: Korihata Sanmania, Upazila: Kapasia, District: Gazipur Road ID no.333362014
Package no: GDP-3/Gaz- 45
|
GDP-3
|
kapasia
|
|
2.15
|
|
|
159.57
|
AK (JV) M/s. Alam Enterprise & Khorshed Enterprise (JV) Kapasia, Gazipur
|
151.08
|
|
|
|
100
|
|
|
09/08/2020
|
|
84
|
225724GDP-3/Gaz-22
|
a) Improvement of Palaspur Bazar - Fulbaria Bazar Road at Ch. 500-2200 Under Upazila:Kapasia : District Gazipur.Road ID no:333364049 b) Improvement Of Maision Miar Bazar -Uttor Khamaer Pakrir Bazar Road at Ch. 00-880m Under Upazila:Kapasia
|
GDP-3
|
kapasia
|
|
3.17
|
|
|
216.88
|
M/S Amzad Traders
|
213.80
|
|
|
|
100
|
|
|
07/07/2020
|
|
85
|
189817 GDP-3/Gaz-13
|
Improvement of Kapasia-Surjanarayanpur Bazar Road at (Ch.3950-5450m) (Road ID-333364012)
|
GDP-3
|
kapasia
|
|
1.50
|
|
|
100.95
|
M/S Sharafat Ent.
|
95.90
|
|
21/06/2018
|
29/03/2019
|
100
|
|
|
10/02/2020
|
|
86
|
GDP-3/Gaz-30
|
3.a) Improvement Of Dashuarayanpur Bazar -Rawtkona Bazar Via BRAC Office Road Ch. 2050-4050m. Under upazila Kapasia District.Gazipur.Road Id No.333364013. b) Improvement Of Baoride Pacca Road -Baoride Gov.Pry.S
|
GDP-3
|
kapasia
|
|
4.00
|
|
|
297.81
|
M/S Rahman Brothers
|
278.78
|
|
|
|
100
|
|
|
10/02/2020
|
|
87
|
214124 GDP-3/Gaz-17
|
a)Improvement of Jamirarchar Petrol Pump (RHD) - Kapasia GC (Kapasia Ranigonj Road Tatulia) Via Rowtkona, Kandania, Khodadia, Borjona Road.(Ch.00-1060m) (Part-a) b) Improvement of Jamirarchar Petrol Pump (RHD) - Kapasia GC (Kapasia Ranigonj Road Tatu
|
GDP-3
|
kapasia
|
|
2.86
|
|
|
243.44
|
M/S. Rahman Brothers
|
254.85
|
29/11/2018
|
|
|
100
|
|
|
01/01/2020
|
|
88
|
191521 GDP-3/Gazi-6
|
Maniker mar Bridge-Khoirapara Eidgah Field Road (Ch.1000-2000m) (Road ID-333364113)
|
GDP-3
|
kapasia
|
|
1.00
|
|
|
66.80
|
M/S Maa Ent.
|
63.46
|
|
10/06/2008
|
17/12/2018
|
100
|
|
|
04/12/2019
|
|
89
|
214125 GDP-3/Gaz-18
|
Improvement of Jamirarchar Petrol Pump (RHD) - Kapasia GC (Kapasia Ranigonj Road Tatulia) Via Rowtkona, Kandania, Khodadia, Borjona Road.(Ch.2864-6057m) (Part-b) Road ID-333362020)
|
GDP-3
|
kapasia
|
|
3.19
|
|
|
169.59
|
SM Enterprice
|
161.11
|
|
18/10/2018
|
24/08/2019
|
100
|
|
|
04/12/2019
|
|
90
|
191522 GDP-3/Gaz-7
|
Ghoshabo Bazar-Sanmania Bazar road (Ch.00-2500m) (Road ID-333364088)
|
GDP-3
|
kapasia
|
|
2.50
|
|
|
164.50
|
M/S Nazmul Hque
|
156.28
|
|
05/06/2018
|
12/01/2019
|
100
|
|
|
09/10/2019
|
|
91
|
191520 GDP-3/Gazi-5
|
Kamargoan Bazar-Shaldoi Bazar Road Via Kamargoan High & Govt. Primary School Road (Ch.1000-3000m) (Road ID-333364131)
|
GDP-3
|
kapasia
|
|
2.00
|
|
|
135.82
|
M/S Sharafat Ent.
|
129.03
|
|
12/06/2018
|
19/03/2019
|
100
|
|
|
06/09/2019
|
|
92
|
196729 GDP-3/Gaz-16
|
Improvement of Moishadhamna Bazar - Chakpara(Charpara) Road at (Ch.00-780m) (Road ID-333364036)
|
GDP-3
|
kapasia
|
|
0.78
|
|
|
52.43
|
Mayer Dua
|
49.81
|
|
01/08/2018
|
08/01/2019
|
100
|
|
|
08/07/2019
|
|
93
|
225722 GDP-3/Gaz-20
|
a)a) Improvement of kapasia GC (Risibari More )-Gee Ghat (RHD) via Equria Bazar Road at Ch.5700-7700m Under Upazila Kapasia, District Gazipur.Road ID no: 333362014. b) Improvement of Baghia Chinaduli Bazar – Trimohan
|
GDP-3
|
kapasia
|
|
4.00
|
|
|
267.82
|
Bishal Khurshid JV
|
259.17
|
|
|
|
100
|
|
|
08/07/2019
|
|
94
|
191530 GDP-3/GAZ-(Reh)-10
|
Maintenance of Balkhelar Bazar-Moragangi Road (Ch.00-3040m) (Road ID-333364002)
|
GDP-3
|
kapasia
|
|
3.04
|
|
|
37.92
|
M/S ripon Ent.
|
36.02
|
|
13/08/2018
|
20/01/2019
|
100
|
|
|
06/05/2019
|
|
95
|
191529 GDP-3/Gaz-9
|
Manik Bazar-Charmonohordi-Sanmania Bazar Link Road (Charmonohordi Part) Road (Ch.1000-1800m) (Road ID-333364114)
|
GDP-3
|
kapasia
|
|
0.80
|
|
|
55.03
|
M/S Maa Ent.
|
52.28
|
|
10/06/2018
|
17/12/2018
|
100
|
|
|
07/03/2019
|
|
96
|
191538 GDP-3/GAZ-(Reh)-11
|
Maintenance of Kamargaon Bazar-Shaldoi Bazar Road (Ch.00-820m) (Road ID-333364007)
|
GDP-3
|
kapasia
|
|
0.82
|
|
|
15.94
|
M/S Star Ent.
|
15.14
|
|
10/06/2018
|
17/08/2018
|
100
|
|
|
|
|
97
|
189818 GDP-3/Gaz-14
|
Improvement of Toke UP-Aralia Road Ponchoboti Bridge via Shimaltali Bridge Road at (Ch.00-500m) (Road ID-333365248)
|
GDP-3
|
kapasia
|
|
0.50
|
|
|
34.48
|
M/S S.S Builders
|
32.76
|
|
10/06/2018
|
17/09/2018
|
100
|
|
|
|
|
98
|
GDP-3/Gaz-84
|
Construction of 27.00m Long PSC Girder Bridge on Sreepur GC to Bormi GC Road at Ch.7900m Under Upazila: Sreepur, District:Gazipur Road ID: 333862001
|
GDP-3
|
sreepur
|
333862001
|
|
27.00
|
|
26053221.00
|
M/S Musfiqure Rahman (Kanchan)
|
23673005.52
|
04/10/2021
|
|
|
15
|
|
|
28/06/2022
|
|
99
|
GDP-3/Gaz-90
|
Improvement of Bormi UPC- Bauni Bazar Road by BC at Ch. 00-1800m under Upazila : Sreepur Dist: Gazipur Road ID No.333863005
|
GDP-3
|
sreepur
|
333863005
|
|
|
|
14219505.00
|
M/S Sohel Enterprise
|
13508529.00
|
02/01/2022
|
|
|
25
|
|
|
28/06/2022
|
|
100
|
GDP-3/Gaz-91
|
Improvement of Jahangirpur - Jogirsit Road by BC at Ch. 2000-3000m under Upazila : Sreepur Dist: Gazipur Road ID No.333865007
|
GDP-3
|
sreepur
|
333865007
|
1.00
|
|
|
8396785.00
|
M/S SHARAFAT ENTERPRISE,
|
7976945.00
|
02/01/2022
|
|
|
50
|
|
|
28/06/2022
|
|
101
|
GDP-3/Gaz-92
|
Improvement of Soilat - Southpara Road by BC at Ch. 00-1000m under Upazila : Sreepur Dist: Gazipur Road ID No.333865070
|
GDP-3
|
sreepur
|
333865070
|
1.00
|
|
|
8242267.00
|
SARIFA ENTERPRISE
|
7830153.00
|
02/01/2022
|
|
|
70
|
|
|
28/06/2022
|
|
102
|
GDP-3/Gaz-76
|
Improvement of Damloi (H/Q) Mofiz Master primary School via Fokir Bazar Bagmara Bridge road from Ch. 00-530m under Union: Kawraid, Upazila : Sreepur Dist: Gazipur Road ID No.333865322
Package no: GDP-3/Gaz-76
|
GDP-3
|
sreepur
|
|
0.53
|
|
|
46.04
|
ALAM ENTERPRISE,
|
43.74
|
|
|
|
100
|
|
|
20/06/2022
|
|
103
|
GDP-3/Gaz-83
|
Construction of 90.00m Long PSC Girder Bridge on Kawraid on UPC – Lalpokurepar Bazar via Shimul toly Bazar Over Matikata River Road at Ch.2700m Under Upazila: Sreepur, District:Gazipur Road ID: 333863022
|
GDP-3
|
sreepur
|
333863022
|
|
90.00
|
|
72954530.00
|
M/S MERCY Enterprise
|
66049862.34
|
21/10/2021
|
|
|
40
|
|
|
20/06/2022
|
|
104
|
203867 GDP3/Gazi-1
|
Improvement of Udoykhali-Pelaid Road (Ch.2000-3500m) (Road ID-333865045).
|
GDP-3
|
sreepur
|
|
1.50
|
|
|
97.98
|
Nawar Trade
|
93.08
|
|
05/09/2018
|
12/05/2019
|
100
|
|
|
19/06/2022
|
|
105
|
GDP-3/Gazi-33
|
a) Improvement Of Fawgun -bashkopa Road At ch.00-1000m Under Sreepur Upazila ,District.GazipurRoad iD No.333865227 b) Improvement Of Mauna Fulbaria badnevanga GPS & Noton Bazaar Via Kitab Ali market Road (Gazipur Ful
|
GDP-3
|
sreepur
|
|
2.99
|
|
|
242.11
|
|
239.50
|
|
|
|
100
|
8500000.00
|
|
19/06/2022
|
|
106
|
Package no: GDP-3/Gaz- 51
|
Improvement of Sonabo kawraid- Galdapara Shimanta Bazar Road From Ch. 00-2000m under Union: Kawraid, Upazila : Sreepur, Dist: Gazipur Road ID No.333865105
Salvage amount Tk. 1,62,068.00
Package no: GDP-3/Gaz-51
|
GDP-3
|
sreepur
|
|
2.00
|
|
|
208.32
|
M/s. D A Enterprise, Pro: Ezarder Mukitur Rahaman, 554, West Nakhal Para, Shaheenbag, Dhaka-1215
|
195.55
|
10/12/2019
|
|
30/12/2020
|
45
|
|
|
19/06/2022
|
|
107
|
GDP-3/Gaz-63
|
Improvement of Bapta-Kawraid Road from Ch. 600-2000m under Upazila : Sreepur Dist: Gazipur Road ID No.333864060
Salvage Cost. 5,81,880.00
Package no: GDP-3/Gaz-63
|
GDP-3
|
sreepur
|
|
1.40
|
|
|
118.82
|
R. P. Engineers
|
112.88
|
|
|
|
100
|
|
|
19/06/2022
|
|
108
|
GDP-3/Gaz-74
|
Improvement of Baldighat Bazar-Haydebpur via Goldapara Road from Ch. 500-1500m under Union: Pohladpur, Upazila : Sreepur, Dist: Gazipur Road ID No.333865109
Salvage Cost. 96,366.00
Package no: GDP-3/Gaz-74
|
GDP-3
|
sreepur
|
|
1.00
|
|
|
77.85
|
TANVIR ENTERPRISE
|
73.96
|
|
|
|
100
|
|
|
19/06/2022
|
|
109
|
GDP-3/Gaz-68
|
Improvement of Patharpara –Indrapur Road from Ch. 2000-3420m under Upazila : Sreepur Dist: Gazipur Road ID No.333864016
Package no: GDP-3/Gaz-68
|
GDP-3
|
sreepur
|
|
1.42
|
|
|
117.88
|
M/S MOMEN ENTERPRISE
|
111.99
|
|
|
|
100
|
|
|
19/06/2022
|
|
110
|
GDP-3/Gaz-69
|
Improvement of Fawgun-Bashkopa link Road from Ch. 1000-1870m under Upazila: Sreepur Dist: Gazipur Road ID No.333865227
Salvage Cost. 2,04,237.00
Package no: GDP-3/Gaz-69
|
GDP-3
|
sreepur
|
|
0.87
|
|
|
70.81
|
MS. S.R ENTERPRISE
|
67.27
|
|
|
|
100
|
|
|
19/06/2022
|
|
111
|
GDP-3/Gaz-70
|
Improvement of Fawgun-Nircchentopur Road from Ch. 00-1000m under Upazila : Sreepur Dist: Gazipur Road ID No.333865317
Package no: GDP-3/Gaz-70
|
GDP-3
|
sreepur
|
|
1.00
|
|
|
77.55
|
SAKIB ENTERPRISE
|
73.68
|
|
|
|
100
|
|
|
19/06/2022
|
|
112
|
GDP-3/Gaz-75
|
Improvement of Shimlapara Bat tala-Badni banga Ali!s house bridge Road from Ch. 00-1000m under Union: Mawna, Upazila : Sreepur Dist: Gazipur Road ID No.333864037
Salvage Cost. 1,11,069.00
Package no: GDP-3/Gaz-75
|
GDP-3
|
sreepur
|
|
1.00
|
|
|
80.18
|
Masud Construction
|
76.17
|
|
|
|
100
|
|
|
19/06/2022
|
|
113
|
GDP-3/Gaz-62
|
Improvement of Nagorhaola Village Muktijodha Iman Ali Road from Ch. 00-1000m under Upazila : Sreepur Dist: Gazipur Road ID No.333865318
Salvage Cost. 1,43,002.00
Package no: GDP-3/Gaz-62
|
GDP-3
|
sreepur
|
|
1.00
|
|
|
85.28
|
SHAHIDULIAH ENTERPRISE
|
81.01
|
|
|
|
100
|
|
|
11/10/2021
|
|
114
|
GDP-3/Gaz-67
|
Improvement of Kasempur (Bazar)-Barotopa via Goldapara GPS Road from Ch. 00-1000m under Upazila : Sreepur Dist: Gazipur Road ID No.333865308
Salvage Cost. 4,90,972.00
Package no: GDP-3/Gaz-67
|
GDP-3
|
sreepur
|
|
1.00
|
|
|
81.27
|
M/S Nehim Enterprise
|
77.20
|
|
|
|
70
|
|
|
10/10/2021
|
|
115
|
GDP-3/Gaz-64
|
Improvement of Izzatpur-Halukaid Road from Ch. 00-1580m under Upazila : Sreepur Dist: Gazipur Road ID No.333865072
Salvage Cost. 3,59,765.00
Package no: GDP-3/Gaz-64
|
GDP-3
|
sreepur
|
|
1.58
|
|
|
121.30
|
M/S.Ataur & Brothers, Pro: Md. Ataur Rahman, Cadda Bazar, Joydebpur, Gazipur-17000
|
115.23
|
|
|
|
100
|
11522821.00
|
|
29/08/2021
|
|
116
|
Package no: GDP-3/Gaz- 53
|
Improvement of Tirmohini (Bhumihin) Busstand – Satkhamair Road From Ch. 00-1620m under Union: Barmi , Upazila : Sreepur, Dist: Gazipur Road ID No.333865013
Salvage Cost. 10,75,101.00
Package no: GDP-3/Gaz- 53
|
GDP-3
|
sreepur
|
|
1.62
|
|
|
129.63
|
M/S. Chowdhury Trading Corporation, Pro: Monir Hossain Chowdhury, Village- Kadda, P/O. Kadda Bazar, Gazipur Sadar, Gazipur
|
123.15
|
|
|
|
100
|
|
|
04/02/2021
|
|
117
|
GDP-3/Gaz-61
|
Improvement of Nagar Hawla Primary School-Nasir Glass (Factori) Road from Ch. 00-1000m under Upazila: Sreepur Dist: Gazipur Road ID No.333865320
Package no: GDP-3/Gaz-61
|
GDP-3
|
sreepur
|
|
1.00
|
|
|
81.79
|
M/s Almas Construction and Gas Co,
|
77.70
|
|
|
|
100
|
|
|
02/02/2021
|
|
118
|
GDP-3/Gaz-42
|
a) Improvement of Kawraid UPC-Lalpokure Bazar via Simul toly Bazar Road at Ch. 2500-4600m under Union: Kawraid, Upazila: Sreepur, District: Gazipur Road ID no.333863022
Salvage Cost 33,367.00
b) Improvement of Kawraid UPC-Lalpokure Bazar via Simul toly Bazar Road at Ch.4600-6400m & 7400-7620m. under Union: Kawraid, Upazila: Sreepur, District: Gazipur Road ID no.333863022
Salvage Cost 7,87,530.00
Package no: GDP-3/Gaz-42
|
GDP-3
|
sreepur
|
|
4.12
|
|
|
357.70
|
M/S Kohinoor Enterprise and Combined Development Corporation JV
|
357.62
|
|
|
|
100
|
|
|
06/12/2020
|
|
119
|
Package no: GDP-3/Gaz- 50
|
Improvement of Bapta GPS Ghuniaguri Railway line Road at Ch. 00-1390m under Union: Kawraid, Upazila : Sreepur, Dist: Gazipur Road ID No.333865151
Salvage Cost. 8,84,703.00
Package no: GDP-3/Gaz- 50
|
GDP-3
|
sreepur
|
|
1.39
|
|
|
105.04
|
SHAHIDULLAH ENTERPRISE, Pro: Md. SHAHIDULLAH SARDAR, RAJARAMPUR, BHAWAL, RAJBARI, SREEPUR, GZIPUR.
|
99.79
|
|
|
|
100
|
|
|
06/12/2020
|
|
120
|
GDP-3/Gaz-44
|
a) Improvement of Bormi UPC (PUC)-Bauni Bazar Road at Ch.5525-7575m. under Union: Urme/Goshinga, Upazila : Sreepur, District: Gazipur Road ID no.333863005
Salvage Cost 1,89,988.00
b) Improvement of Goshinga-Savarchala (P/School) Road at Ch.00-1000m. under Union:Goshinga, Upazila : Sreepur, District: Gazipur Road ID no.333865121
Package no: GDP-3/Gaz-44
|
GDP-3
|
sreepur
|
|
3.05
|
|
|
254.62
|
M/S Kohinoor Enterprise and Combined Development Corporation JV,
|
254.48
|
|
|
|
100
|
|
|
04/11/2020
|
|
121
|
Package no: GDP-3/Gaz- 52
|
Improvement of Bawni Montaz Dr.More - Rahman Monshi bari (Bawni Bazar – Lohagach ) Road From Ch. 00-1000m under Union: Gosinga, Upazila : Sreepur, Dist: Gazipur Road ID No.333865222
Package no: GDP-3/Gaz- 52
|
GDP-3
|
sreepur
|
|
1.00
|
|
|
79.63
|
M. Sarkar & CO Pro: Md. Sahadat Hossain Mukul, Akata Super Market, Thana Council, Gazipur
|
75.65
|
|
|
|
100
|
|
|
09/08/2020
|
|
122
|
Package no: GDP-3/Gaz- 46
|
Improvement of Gazipur UPC-Shimlapara Bazar Road at Ch. 1500-3670m under Union: Gazipur, Upazila Sreepur, District: Gazipur Road ID no.333863015
Salvage Cost 13,19,769.00
Package no: GDP-3/Gaz- 46
|
GDP-3
|
sreepur
|
|
2.17
|
|
|
164.44
|
M/s. Amzad Traders, Pro: Md. Faruk Mia, Mulganj, Kaliganj, Gazipur
|
162.88
|
|
|
|
100
|
|
|
07/07/2020
|
|
123
|
189606 GDP-3/Gazi-4
|
Improvement of Faugan-Lakkipur Road Ch.973-1663m (Road ID-333865073)
|
GDP-3
|
sreepur
|
|
0.69
|
|
|
47.21
|
M/S S.S Ent.
|
44.85
|
|
25/06/2018
|
31/12/2018
|
100
|
|
|
10/02/2020
|
|
124
|
GDP-3/Gaz- 39
|
a) Improvement of Uttar Palaid Mandaimour- Eman Ali Road at Ch.00-850m. under Upazila Sreepur, District: Gazipur Road ID no.333865316 Salvage Cost Tk. 13,81,072.00
b) Improvement of Potka-Chawbon Road at Ch.00-1000m. under Upazila Sreepur, District: Gazipur Road ID no.333865075
Package no: GDP-3/Gaz- 39
|
GDP-3
|
sreepur
|
|
1.85
|
|
|
135.36
|
M/S. Almas Construction and Gas Co Pro: Md. Almas Ali, Khandaker Market, Sign Board, National University, Gasipur.
|
128.59
|
|
|
|
100
|
|
|
10/02/2020
|
|
125
|
203868 GDP3/Gazi-2
|
Improvement of Murgir Bazar-Pelaid Road (Ch.00-1000m) (Road ID-333865304).
|
GDP-3
|
sreepur
|
|
1.00
|
|
|
76.95
|
Nawar Trade
|
73.10
|
|
05/09/2018
|
12/05/2019
|
100
|
|
|
01/01/2020
|
|
126
|
GDP- IV/Gaz/KALI/W(R)-117
|
Improvement of Shaturia Sholahati Bridge - Gobindopur via Aliarchala Govt Primary School at Ch. 00 - 630m by HBB & Ch. 630 -1980m by BC
with 3 Nos U-Drain 0.600*0.600m at Ch.580, 720 & 1280m under Kaliakoir Upazilla, District: Gazipur. (Road ID No: 333324041) [Salvage Cost: Tk. 5,03,346.00]
|
GDP-4
|
kaliakoir
|
333324041
|
1.98
|
|
|
160.31
|
"M/S Belal & Brothers "
|
153.90
|
15/10/2019
|
|
30/04/2020
|
35
|
|
|
01/10/2020
|
|
127
|
GDP-IV/ GAZ/KALI/W(R)-123
|
(1). Improvement of Thangarbandh H/o Nazmul Alam - Pailot Mossha Khama via house of Shamsul Haque (X Minister house) at Ch. 00 - 1000m by BC with 2 Nos U-Drain 0.600*0.600m at Ch. 365 & 650m under Kaliakoir Upazilla, District: Gazipur. (Road ID No: 333325316) [Salvage Cost: Tk. 6,34,857.00] (2). Improvement of Bareque Market Kusholnath (Kuwarchala) Near at Mozammel Dukan more - Dubail Mossho Khamar road Via H/O Azim Bari at Ch. 00 - 760m by BC under Kaliakoir Upazilla, District: Gazipur. (Road ID No: 333325318) [Salvage Cost: Tk. 3,71,570.00]
|
GDP-4
|
kaliakoir
|
333325316 333325318
|
1.76
|
|
|
132.43
|
"M/S Belal & Brothers "
|
127.13
|
15/10/2019
|
|
30/04/2020
|
45
|
|
|
01/10/2020
|
|
128
|
GDP-1V/ Gaz/Kali/W(R)-115
|
Improvement of Dubail Bridge to Pakurail Road( Dubail Bridge -Dokkhin Bandhabari Jame Mosque Roadat ch.00-2415m Under Upazila: Kaliakoir, District: Gazipur. (Road ID No: 333324057).
|
GDP-4
|
kaliakoir
|
333324057
|
2.45
|
|
|
259.50
|
Bishal & Sourav Enterprise (JV)
|
282.33
|
12/04/2020
|
|
25/04/2021
|
30
|
|
|
01/10/2020
|
|
129
|
GDP-IV/ GAZ/KALI/ W(R)-120
|
1) Improvement of Dainkini Chandra saw mill road Dainkini GPS Walton Bridge Via Mojibor Chairman bari road by BC ch.00-1130m 2) Improvement of barishabo pacca road Mullukbari Mosque Community Clinic Bariabaha GPS Connecting Road by BC ch.00- 1000m
|
GDP-4
|
kaliakoir
|
333325037 333325314
|
2.13
|
|
|
176.72
|
|
0.00
|
|
|
|
0
|
|
|
01/10/2020
|
|
130
|
GDP-1V/ Gaz/Kali/(R)-337
|
Improvement of Chapair up - Bangla Bazar Via Joina Bazar road (Chapair UP Office puccja road - boro Gobindopur Boura Chala -sath kura Advocate mojibur house road at ch.1500- 3500m
|
GDP-4
|
kaliakoir
|
333323015
|
2.00
|
|
|
279.57
|
M/S Nero & Brothers
|
293.09
|
13/04/2020
|
|
30/04/2021
|
35
|
|
|
01/10/2020
|
|
131
|
GDP-IV/ GAZ/KALI/ W(R)-125
|
Improvement of Gabtoly belaler house- master Bari jame Mosque road at ch.00-750m
|
GDP-4
|
kaliakoir
|
333325323
|
0.75
|
|
|
70.07
|
Maer Doa Enterprise
|
66.57
|
20/02/2020
|
|
26/12/2020
|
80
|
|
|
01/10/2020
|
|
132
|
GDP-IV/GAZ/ KAli/W(R)-342
|
(1) Maintenance of Sawraid GC-mukterpur monir udddin house - Islam sarkar house road at ch.00- 450m (2) Maintenance of Nagori - borkaw road Tiuri panjora road at ch.00- 500m (3) Maintenance of Jamalpur college - medipur (Feritola) road at ch.00-1100m
|
GDP-4
|
kaliganj
|
333345119 333345061 333344106
|
2.05
|
|
100
|
55.00
|
M/S Shapnil Traders
|
52.25
|
16/03/2020
|
|
25/01/2021
|
100
|
52.07
|
100
|
07/11/2022
|
|
133
|
GDP-IV/GAZ/ KAli/W(R)-341
|
(1) Maintanace of Sawraid GC-Muktarpur UP H/Q Road Via taragong Bazar road at ch.2100-3200m , (2) Maintanace of Borogaon Bazar- Bagun road at ch.00-2260m (3) Maintanace of Jangalia Bazar- Janggalia molla bari road at ch.00-600m
|
GDP-4
|
kaliganj
|
333343007 333344074 333345052
|
3.96
|
|
|
128.16
|
M/S. B.N.S Construction
|
121.75
|
27/02/2020
|
|
20/01/2021
|
20
|
|
|
01/10/2020
|
|
134
|
GDP-IV/GAZ/ KAP/W(R)-131
|
(1) Improvement of Dashunarayanpur Pabur Bazar Road by BC at Ch. 800-1250m under Upazila : Kapasia, District : Gazipur. (Road ID No: 333364010), (2) Improvement of Kapasia Sreepur Road (St. from Mollah Bari) to Late Latif and Engineer Mosharraf House Road by BC at Ch. 00- 480m under Upazila : Kapasia, District : Gazipur. (Road ID No: 333365162), (3) Improvement of B.SC Bus Stand Bishnopur GPS Chandalhata Madrasha via Morilla Teke Road by BC at Ch. 00- 425m under Upazila : Kapasia, District : Gazipur. (Road ID No: 333364090), (4) Improvement of Kamergaon Barishabo (St. from Boru Bari Mozid College) Baner River Ghat via Khirati Purbopara GPS, Community Clinic Road by BC at Ch. 00- 480m under Upazila : Kapasia, District : Gazipur. (Road ID No: 333365161), (5) Improvement of Bhuleshwar Chowrasta Barahar Majid Molla Dakhil Madrasha Road by BC at Ch. 00-455m under Upazila : Kapasia, District : Gazipur. (Road ID No: 333365017) [Salvage Cost 6,30,954.00]
|
GDP-4
|
kapasia
|
333364010 333365162 333364090 333365161 333365017
|
2.29
|
|
|
174.59
|
M/S Hamid Builders
|
161.06
|
27/02/2020
|
|
20/01/2021
|
20
|
|
|
04/10/2020
|
|
135
|
GDP-IV/ GAZ/ KAP/ W(R)-10
|
a) Rayed Union H/Q-Barishabo bazar via Kotamani bazar Rd b).Kapasia upazila H/Q (Hospital More )-Rayed GC Via dordoria Bazer road
|
GDP-4
|
kapasia
|
333363023 333365098
|
3.00
|
|
100
|
232.61
|
M/S Bishal Enterprise & M/S. Hamid Builders (JV)
|
214.20
|
31/07/2019
|
|
02/07/2020
|
100
|
212.19
|
100
|
01/10/2020
|
|
136
|
GDP-IV/ GAZ/KAP/ W(R)-132
|
Kamergaon Barishabo Road (St From Boru bari Mozid College) - Baner River Ghat Via Khirati Purbopara GPS, Commiunity Clinic Road.
|
GDP-4
|
kapasia
|
333365161
|
1.00
|
|
30
|
68.97
|
M/S Mim Enterprise
|
65.52
|
04/07/2019
|
|
11/12/2019
|
70
|
17.87
|
30
|
01/10/2020
|
|
137
|
GDP-IV/ GAZ/KAP /W(R)-20
|
Improvement of Deona Kachari Bazar-Borahar Bazar Road at Ch. 1000-1950m.
|
GDP-4
|
kapasia
|
333364047
|
0.95
|
|
100
|
69.95
|
M/S. Mohana Enterprise
|
66.45
|
25/09/2019
|
|
30/12/2019
|
100
|
64.59
|
100
|
01/10/2020
|
|
138
|
GDP-IV/GAZ/ KAP/W(R)-126.
|
(1) Improvement of Kapasia-Vakudia Road. St. From Borun High School to Dist. Judge Solaimans House Road at Ch. 00-1000m. (2) Improvement of Rowtkona Madrasha - Ibrahim Market Road at Ch. 2200- 3600m. (3) Improvement of Kapasia Pabur R&H Road.Rautkona - Pabur Bazar Via Chairman House BRDB Road at Ch. 00- 900m.(Salvage cost TK. 119134.00 )
|
GDP-4
|
kapasia
|
333364066 333365028 333364073
|
3.30
|
|
|
243.13
|
M/S Amzad Traders
|
225.40
|
23/10/2019
|
|
23/10/2019
|
85
|
|
|
01/10/2020
|
|
139
|
GDP-IV/ GAZ/KAP/ W(R)-127
|
(1) Improvement of Shanmania Bazar Gabtoli More - Tetultola More via Kazi bari More Road at Ch. 00-1000m. (2) Improvement of Durgapur Union H/Q- Kamramashuk Senior Madrasha Via Chapat Bazar Rawnat Bazar Fulbaria Natun Bazar Road at Ch. 9770-10970m.
|
GDP-4
|
kapasia
|
333364098 333363011
|
2.20
|
|
25
|
159.30
|
M/S Heaven Enterprise
|
156.78
|
23/10/2019
|
|
30/04/2020
|
70
|
40.00
|
25
|
01/10/2020
|
|
140
|
GDP-IV/ GAZ/KAP/ W(R)-128
|
(1) Improvement of Ballkhalar Bazar - Nalgaon Bazar Rd. St. from Kazi Bari - Pabur kazahazi Connecting Rd.Via H/O Jhangir Road at Ch. 00- 1000m.(2) Improvement of Ranigonj GC - Gazipur Road Kazahaji to Nalgaon Bazar Road at Ch. 2000-3000m. [Salvage cost TK. 486489.00]
|
GDP-4
|
kapasia
|
333365095 333365084
|
2.00
|
|
31
|
144.09
|
"Sretee Enterprise "
|
132.29
|
23/10/2019
|
|
30/03/2020
|
85
|
41.00
|
31
|
01/10/2020
|
|
141
|
GDP-IV/GAZ/ Sree/W(R)-18
|
1) Improvement of Joina Bazar - Gazipur UPC road by BC Ch.3750-5750m 2) Improvement of Gazopur UPC Bashbari Bazar road by BC Ch.00-1000m 3) Improvement of Kawraid UPC Lalpukur bazar via Simultoly Bazar road by BC 8500-10500m
|
GDP-4
|
sreepur
|
333863019 333863020 333863022
|
5.00
|
|
100
|
417.67
|
M/S Kohinoor Enterprise and Combined Development Corporation JV
|
415.00
|
15/07/2020
|
|
30/07/2021
|
100
|
414.25
|
100
|
07/11/2022
|
|
142
|
GDP-IV/ GAZ/SREE/ W(R)-103
|
1)Improvement of Bormi-nandia sangun Road by BC ch.00-1000m Road ID No.333865104Under Upazila Sreepur District Gazipur 2) Improvement of Mitalu Sahjahanpur Road by BC ch. 3250- 4250m Road ID No.333865074 Under Upazila Sreepur District Gazipur 3) Improvement of Izzatpur sahajanpur Bazar via Mosque of suruj mastar bari road ch.990-2100m Road ID No.333865083 Under Upazila Sreepur District Gazipur
|
GDP-4
|
sreepur
|
333865104 333865074 333865083
|
3.11
|
|
|
255.55
|
M/S Kohinoor Enterprise
|
266.48
|
|
|
|
0
|
|
|
05/10/2020
|
|
143
|
GDP-IV/ GAZ/SREE/ W(R)-108
|
1) Improvement of Vitipara Joynarayonpur road by BC 1900-2900m 2) Improvement of joyna Kawraid road karani bari road lacjchatol via natoker Bazar road by BC ch. 00-1000m 3)Improvement of sathkhamair Gulaghat road by BC ch.4000-5000m
|
GDP-4
|
sreepur
|
333865002 333865328 333864008
|
3.00
|
|
|
244.49
|
Mitho Enterprise
|
240.17
|
|
|
|
0
|
|
|
05/10/2020
|
|
144
|
GSIDP/GAZ/DW-11
|
Improvement of Ulukhola Ram Kanai Kali Mondir. Union: Nagari Latitude: 23.74625, Longitude: 90.54783
|
GSIDP
|
kaliganj
|
|
|
|
|
5.00
|
M/S Semul Enterprise
|
4.75
|
|
12/06/2018
|
12/07/2018
|
0
|
|
|
|
|
145
|
GSIDP/GAZ/DW-12
|
Improvement of kaliganj Central Jame Mosque. Union: kaliganj Latitude: 23.92435, Longitude: 90.57387
|
GSIDP
|
kaliganj
|
|
|
|
|
5.01
|
M/S Semul Enterprise
|
4.76
|
|
12/06/2018
|
12/09/2018
|
100
|
|
|
|
|
146
|
GSIDP/GAZ/DW-13
|
Improvement of Royen-Dhunun-Gararia Eidgha Union: Nagori Latitude: 23.89385, Longitude: 90.55092
|
GSIDP
|
kaliganj
|
|
|
|
|
5.00
|
M/S. Maa Enterprise
|
4.75
|
|
24/06/2018
|
17/08/2018
|
100
|
|
|
|
|
147
|
GSIDP/GAZ/DW-14
|
Improvement of Kholapara Famous Eidgha Field. Union: bahadursadi Latitude: 23.93969, Longitude: 90.6092
|
GSIDP
|
kaliganj
|
|
|
|
|
5.00
|
M/S. Maa Enterprise
|
4.75
|
|
14/06/2018
|
13/08/2018
|
100
|
|
|
|
|
148
|
GSIDP/GAZ/DW-15
|
Improvement of Fuldi Eidgha Field. Union: Bokterpur Latitude: 23.97603, Longitude: 90.5526
|
GSIDP
|
kaliganj
|
|
|
|
|
5.00
|
M/S Rahman Brothers.
|
4.75
|
|
13/06/2018
|
13/08/2018
|
100
|
|
|
|
|
149
|
GSIDP/GAZ/DW-1
|
Improvement of Pakurdiya Jame Mosque Union: Toke, Latitude: 24.25775, Longitude: 90.64039
|
GSIDP
|
kapasia
|
|
|
|
|
5.00
|
MS Ma Moni Enterprise
|
4.75
|
|
13/06/2018
|
13/08/2018
|
100
|
|
|
|
|
150
|
GSIDP/GAZ/DW-2
|
Improvement of Singasree Bazar Center Jame Masque Union: Singasree, Latitude: 24.23010, Longitude: 90.54756
|
GSIDP
|
kapasia
|
|
|
|
|
7.83
|
M/S. Morol Enterprise. Prop: Md. Suruj Mondol
|
7.43
|
|
13/06/2018
|
28/08/2018
|
100
|
|
|
|
|
151
|
GSIDP/GAZ/DW-3
|
Improvement of Kapasia Darul Ulum Madrasia Mosque Union: Kapasia, Latitude: 24.11301, Longitude: 90.55607
|
GSIDP
|
kapasia
|
|
|
|
|
5.42
|
Sretee Enterprise
|
5.14
|
|
19/06/2018
|
19/08/2018
|
50
|
|
|
|
|
152
|
GSIDP/GAZ/DW-4
|
Improvement of Fakir Bari Bazar Jame Mosque Union: Korihata, Latitude: 24.12910, Longitude: 90.61840
|
GSIDP
|
kapasia
|
|
|
|
|
5.00
|
Sretee Enterprise
|
4.75
|
|
19/06/2018
|
18/08/2018
|
100
|
|
|
|
|
153
|
GSIDP/GAZ/DW-5
|
Improvement of Aral Bazar Jame Mosque Union: Sonmania, Latitude: 24.11145, Longitude: 90.70139
|
GSIDP
|
kapasia
|
|
|
|
|
5.22
|
Sretee Enterprise
|
4.96
|
|
19/06/2018
|
19/08/2018
|
100
|
|
|
|
|
154
|
GSIDP/GAZ/DW-6
|
Improvement of Gagutiachala Bazar Jame Mosque Union: Gagtia, Latitude: 24.11515, Longitude: 90.68440
|
GSIDP
|
kapasia
|
|
|
|
|
5.07
|
MS Ma Moni Enterprise
|
4.82
|
|
12/06/2018
|
13/08/2018
|
100
|
|
|
|
|
155
|
GSIDP/GAZ/DW-7
|
Improvement of Vakodia Kedrio Jame Masque Union: Chadpur, Latitude: 24.04548, Longitude: 90.57476
|
GSIDP
|
kapasia
|
|
|
|
|
5.00
|
M/S. Maa Enterprise
|
4.75
|
|
14/06/2018
|
17/08/2018
|
50
|
|
|
|
|
156
|
GSIDP/GAZ/DW-8
|
Improvement of Beltoly Bazar Jame Mosque Union: Barishabo, Latitude: 24.19410, Longitude: 90.67818
|
GSIDP
|
kapasia
|
|
|
|
|
5.42
|
M/S M.R Enterprise
|
5.14
|
|
13/06/2018
|
06/05/2019
|
20
|
|
|
|
|
157
|
GSIDP/GAZ/DW-9
|
Improvement of Torgaon Rishipara Shashanghat Roof & Stair (Remening Work) Union: Torgaon, Latitude: 24.16661, Longitude: 90.5825
|
GSIDP
|
kapasia
|
|
|
|
|
5.37
|
M/S M.R Enterprise
|
5.10
|
|
12/06/2018
|
12/08/2018
|
10
|
|
|
|
|
158
|
GSIDP/GAZ/DW-10
|
Improvement of Dordoria Eidgah Fild Union: Rayed, Latitude: 24.18132, Longitude: 90.55518
|
GSIDP
|
kapasia
|
|
|
|
|
5.13
|
M/S M.R Enterprise
|
4.88
|
|
12/06/2018
|
12/08/2018
|
20
|
|
|
|
|
159
|
IRIDP-2/GAZ/DW-1
|
a) Improvemrnt of Saturia Solahati High School-Gopinpur via Tanerchala Road from ch.00-1500m.b) Construction of 06 nos 0.625mx0.600m culvert at ch.294,387,650,754,950 & 1380m on the same road.
|
IRIDP-2
|
kaliakoir
|
|
1.50
|
|
|
103.02
|
M/S. Arju Construction. Pro-Md Hedayet Ullah
|
90.15
|
|
23/02/2016
|
30/06/2017
|
100
|
|
|
|
|
160
|
IRIDP-2/GAZ/DW-2
|
a) Improvement of NHW Dhaka-Tangail Road-Akhra (Noapara Road) Road from ch.00-1000m. b) Construction of 05 nos 0.625mx0.600m culvert at ch.50,100,235,775 & 862m on the same road.
|
IRIDP-2
|
kaliakoir
|
|
1.00
|
|
|
69.82
|
M/S. Ataur & Brothers. Pro: Md.Ataur Rahman
|
58.54
|
|
09/02/2016
|
30/03/2017
|
100
|
|
|
|
|
161
|
IRIDP-2/GAZ/DW-3
|
a) Improvement of Amdair - Mazukhan Road from ch.600-1600.00m.b) Construction of 05 nos 0.625mx0.600m culvert at ch.610,900,1050,1400 & 1250m on the same road.
|
IRIDP-2
|
kaliakoir
|
|
1.00
|
|
|
64.21
|
M/S. Refat Enterprise, Prop: Md. Salimullah Sarker
|
59.33
|
|
11/02/2016
|
08/08/2016
|
100
|
|
|
|
|
162
|
IRIDP-2/GAZ/DW-4
|
a) Improvement of Paikpara Bite Office-Sarkar Bari via Dholshumodre GPS& Dholshumodre Girls high school road from ch. 00-1200.00m.b) Construction of 04 nos 0.625mx0.600m culvert at ch.110,740,820 & 970m on the same road.
|
IRIDP-2
|
kaliakoir
|
|
1.20
|
|
|
75.58
|
MS Turag Trader sPro-Md.Bir Muktijoddah Alhaj Md Abu Sayed
|
64.13
|
|
17/02/2016
|
31/01/2017
|
100
|
|
|
|
|
163
|
IRIDP-2/GAZ/DW-5
|
a) Improvement of Vingraj High School-Rail Line via Baz Hijoltoli Madrasha Road from ch.300-1300m.b) Construction of 03 nos 0.625mx0.600m culvert at ch.580,620 & 1249m on the same road.
|
IRIDP-2
|
kaliakoir
|
|
1.00
|
|
|
74.75
|
M/S. Sourav Enterprise. Pro-Md. Shamim Ahmed
|
64.81
|
|
24/02/2016
|
24/09/2016
|
100
|
|
|
|
|
164
|
IRIDP-2/GAZ/DW-6
|
a) Improvement of Dong Bang Factory Habibpur road from ch. 00-1000.00m.b) Construction of 06 nos 0.625mx0.600m culvert at ch.17,80,230,425,586 & 849m on the same road.
|
IRIDP-2
|
kaliakoir
|
|
1.00
|
|
|
65.66
|
MS. C. H. Enterprise, Pro: Md. Emrul Kayes Faruk
|
58.60
|
|
10/02/2016
|
17/04/2017
|
100
|
|
|
|
|
165
|
IRIDP-2/GAZ/DW-7
|
Improvement of Kapasia Monohordi Road (St. from Nabipur Karim’s Mill)- Torgaon River Par Road from Ch.1500-2250m.
|
IRIDP-2
|
kapasia
|
|
0.75
|
|
|
49.52
|
M/S.Shohag Traders.Pro-Md.Mojibur Rahman Chowdury
|
40.68
|
|
17/03/2016
|
30/04/2017
|
100
|
|
|
|
|
166
|
IRIDP-2/GAZ/DW-8
|
Improvement of Toke Union H/Q (Toke GC More)- Hariadi Kheya Ghat via Sohagpur Bazar, Ulusara Bazar Road from Ch.10800 -11940m.
|
IRIDP-2
|
kapasia
|
|
1.14
|
|
|
66.04
|
M/S Sharafat Enterprise.Pro-Md.Kutobul Alam
|
54.68
|
|
15/03/2016
|
14/09/2016
|
100
|
|
|
|
|
167
|
IRIDP-2/GAZ/DW-9
|
Improvement of Kapasia-Ranigonj GC (St. From Arshad Master)- Ranigonj-Gazipur Canecting Road from Ch.200-1200m.
|
IRIDP-2
|
kapasia
|
|
1.00
|
|
|
56.86
|
M/S. Morol Enterprise. Prop: Md. Suruj Mondol
|
47.62
|
|
06/03/2016
|
05/09/2016
|
100
|
|
|
|
|
168
|
IRIDP-2/GAZ/DW-10
|
Improvement of Ranigonj GC- Gazipur Road from Kazahaji to Nalgaon Bazar Road from Ch.150-650m.=
|
IRIDP-2
|
kapasia
|
|
0.50
|
|
|
28.43
|
Al-Fyroo Engineering Co.Pro-Md.Faroque Hossain Sarker
|
24.93
|
|
05/05/2016
|
16/10/2016
|
100
|
|
|
|
|
169
|
IRIDP-2/GAZ/DW-11
|
Improvement of Kamargoan Bazar-Barishabo Bazar (Khirat Mojid House-Khirati Bazar) Road from Ch.2248-2748m.
|
IRIDP-2
|
kapasia
|
|
0.50
|
|
|
28.43
|
M/S. Moriom Enterprise.Pro-Md.Iqbal Hossain Riton
|
24.29
|
|
13/03/2016
|
15/11/2016
|
100
|
|
|
|
|
170
|
IRIDP-2/GAZ/DW-12
|
Improvement of Sanmania Sayeb Ali Bazar to LGED Road Sanmania Dakhil Madrasha to Majhi Barir Parsa C & B More from Ch.00-510m.
|
IRIDP-2
|
kapasia
|
|
0.51
|
|
|
29.20
|
M/S. New Acme Builders.Prop-Md.Anower Hossain
|
24.51
|
|
04/03/2016
|
30/08/2016
|
100
|
|
|
|
|
171
|
IRIDP-2/GAZ/DW-13
|
Improvement of Singhasree Union H/Q-Amraid Bazar road (Tallapara Mogartake Bazar-Belashi Senior Madrasha Road) from Ch.6550-7050m.
|
IRIDP-2
|
kapasia
|
|
0.50
|
|
|
28.97
|
M/S. Khorshed Enterprise. Pro: Md. Mahabubul Alam
|
23.98
|
|
24/07/2016
|
24/01/2017
|
100
|
|
|
|
|
172
|
IRIDP-2/GAZ/DW-14
|
Improvement of Biruzuli Amtoly Bazar (Uzuli Bazar)-Toke Nagor Pubali Bazar Road from at Ch.1000-1500m.
|
IRIDP-2
|
kapasia
|
|
0.50
|
|
|
28.43
|
M/S. Mojnu Traders.Pro-Md.Monnu Mia(Karim)
|
23.54
|
|
15/03/2016
|
13/09/2016
|
100
|
|
|
|
|
173
|
IRIDP-2/GAZ/DW-15
|
Improvement of Surjanarayanpur Bazar (Dhopar Bad)- Pabur nama Bazar Road from Ch.300-800m.
|
IRIDP-2
|
kapasia
|
|
0.50
|
|
|
28.43
|
M/S Nadim Nahid Enterprise.Pro-Md.Mohibur Rahman
|
23.84
|
|
20/03/2016
|
19/09/2016
|
100
|
|
|
|
|
174
|
e-Tender/NBIDNNGPS/GAZ/GAZ/2017-2018/W1-00141
|
UPAZILA PATHSHALA GOVT. PRIMARY SCHOOL
|
NBIDNNGPS
|
gazipur-s
|
|
|
|
|
68.55
|
MD Aktaruzzaman
|
61.69
|
|
10/04/2018
|
20/04/2019
|
70
|
|
|
|
|
175
|
e-Tender/NBIDNNGPS/GAZ/GAZ/2017-2018/W1-00142
|
MERARGAONG
|
NBIDNNGPS
|
gazipur-s
|
|
|
|
|
71.31
|
M/S Olive Enterprise
|
64.18
|
|
09/04/2018
|
20/04/2019
|
60
|
|
|
|
|
176
|
e-Tender/NBIDNNGPS/GAZ/GAZ/2018-2019/W1-02187
|
KANJANUL GOVT. PRIMARY SCHOOL
|
NBIDNNGPS
|
gazipur-s
|
|
|
|
|
73.32
|
M/S Nurjahan Enterprise
|
69.66
|
|
|
|
0
|
|
|
|
|
177
|
e-Tender/NBIDNNGPS/GAZ/GAZ/2018-2019/W1-02210
|
B.K. BARI HOSSANIYA RPS
|
NBIDNNGPS
|
gazipur-s
|
|
|
|
|
71.54
|
M/S Shahidullah Enterprise
|
67.96
|
|
|
|
0
|
|
|
|
|
178
|
e-Tender/NBIDNNGPS/GAZ/GAZ/2018-2019/W1-02211
|
SATPOBHA TALTIYA RPS
|
NBIDNNGPS
|
gazipur-s
|
|
|
|
|
73.25
|
M/S Bhuiyan Builders
|
69.59
|
|
|
|
0
|
|
|
|
|
179
|
e-Tender/NBIDNNGPS/GAZ/GAZ/2018-2019/W1-02212
|
JYERTAKE GOVERMENT PRIMARY SCHOOL
|
NBIDNNGPS
|
gazipur-s
|
|
|
|
|
72.67
|
M/S Lata Enterprise
|
69.04
|
|
|
|
0
|
|
|
|
|
180
|
e-Tender/NBIDNNGPS/GAZ/KAL/2017-2018/W1-00545
|
KARI CHALA REG PRIMARY SCHOOL
|
NBIDNNGPS
|
kaliakoir
|
|
|
|
|
70.95
|
M/s Ma Moni Enterprsie
|
67.52
|
|
30/05/2018
|
30/05/2019
|
65
|
|
|
|
|
181
|
e-Tender/NBIDNNGPS/GAZ/KAL/2017-2018/W1-00546
|
GOJARIACALA GOVT. PRIMARY SCHOOL
|
NBIDNNGPS
|
kaliakoir
|
|
|
|
|
70.84
|
M/s Sabbir Enterprise
|
67.42
|
|
31/05/2018
|
30/05/2019
|
60
|
|
|
|
|
182
|
e-Tender/NBIDNNGPS/GAZ/KAL/2017-2018/W1-00547
|
MURADPUR
|
NBIDNNGPS
|
kaliakoir
|
|
|
|
|
53.36
|
M/s Sahera Enterprise
|
50.69
|
|
04/06/2018
|
30/05/2019
|
50
|
|
|
|
|
183
|
e-Tender/NBIDNNGPS/GAZ/KAP/2017-2018/W1-00143
|
BORI BARI RPS
|
NBIDNNGPS
|
kapasia
|
|
|
|
|
69.02
|
M/S Sretee enterprise
|
65.46
|
|
04/04/2018
|
03/04/2019
|
78
|
|
|
|
|
184
|
e-Tender/NBIDNNGPS/GAZ/KAP/2017-2018/W1-00144
|
PACHUIYA PURBA PARA RPS
|
NBIDNNGPS
|
kapasia
|
|
|
|
|
69.67
|
M/S Santa Enterprise
|
62.70
|
|
06/04/2018
|
08/04/2019
|
41
|
|
|
|
|
185
|
e-Tender/NBIDNNGPS/GAZ/KAP/2017-2018/W1-00145
|
DAKSHIN GAURAR RPS
|
NBIDNNGPS
|
kapasia
|
|
|
|
|
69.02
|
M/S Sretee Enterprise
|
68.68
|
|
13/04/2018
|
18/04/2019
|
63
|
|
|
|
|
186
|
e-Tender/NBIDNNGPS/GAZ/KAP/2017-2018/W1-00146
|
PAYRIGHT OHABIYA RPS
|
NBIDNNGPS
|
kapasia
|
|
|
|
|
69.02
|
M/S Santa Enterprise
|
62.12
|
|
22/03/2018
|
26/03/2019
|
86
|
|
|
|
|
187
|
e-Tender/NBIDNNGPS/GAZ/KAP/2017-2018/W1-00147
|
SORSURPUR RPS
|
NBIDNNGPS
|
kapasia
|
|
|
|
|
69.02
|
M/S Sretee Enterprise
|
62.12
|
|
13/04/2018
|
17/04/2019
|
81
|
|
|
|
|
188
|
e-Tender/NBIDNNGPS/GAZ/KAP/2017-2018/W1-00148
|
TAN CHOURA PARA RPS
|
NBIDNNGPS
|
kapasia
|
|
|
|
|
66.19
|
M/S Sretee enterprise
|
63.62
|
|
08/04/2018
|
08/04/2019
|
65
|
|
|
|
|
189
|
e-Tender/NBIDNNGPS/GAZ/KAP/2017-2018/W1-00149
|
SURJANARAYANPUR DAKHSINPARA RPS
|
NBIDNNGPS
|
kapasia
|
|
|
|
|
69.02
|
M/S Sretee enterprise
|
68.56
|
|
22/03/2018
|
21/03/2019
|
45
|
|
|
|
|
190
|
e-Tender/NBIDNNGPS/GAZ/KAP/2017-2018/W1-00150
|
BARA PUSHIYA RPS
|
NBIDNNGPS
|
kapasia
|
|
|
|
|
66.19
|
M/S RifatEnterprise
|
65.94
|
|
06/04/2018
|
14/04/2019
|
44
|
|
|
|
|
191
|
e-Tender/NBIDNNGPS/GAZ/KAP/2017-2018/W1-00151
|
RAUTKONA BHUYAN BARI RPS
|
NBIDNNGPS
|
kapasia
|
|
|
|
|
70.25
|
M/S Nahar enterprise
|
63.23
|
|
15/03/2018
|
14/03/2019
|
48
|
|
|
|
|
192
|
e-Tender/NBIDNNGPS/GAZ/KAP/2017-2018/W1-00607
|
CHARSANMANIYA RPS
|
NBIDNNGPS
|
kapasia
|
|
|
|
|
58.01
|
M/S M.R Enterprise
|
55.11
|
|
20/05/2018
|
26/05/2019
|
68
|
|
|
|
|
193
|
e-Tender/NBIDNNGPS/GAZ/KAP/2018-2019/W1-01947
|
NOBIPUR PURBAPARA RPS
|
NBIDNNGPS
|
kapasia
|
|
|
|
|
35.43
|
M/s Bhuiyan Corporation
|
33.66
|
|
27/12/2018
|
|
10
|
|
|
|
|
194
|
e-Tender/NBIDNNGPS/GAZ/KAP/2018-2019/W1-02143
|
NOLGOAN KHOIRA PARA RPS
|
NBIDNNGPS
|
kapasia
|
|
|
|
|
73.18
|
M/S Bhuiyan & Brothers
|
69.52
|
|
27/12/2018
|
|
10
|
|
|
|
|
195
|
e-Tender/NBIDNNGPS/GAZ/KAP/2018-2019/W1-02144
|
FATALIYA RPS
|
NBIDNNGPS
|
kapasia
|
|
|
|
|
73.18
|
M/S Dihan Enterprise
|
69.52
|
|
27/12/2018
|
|
10
|
|
|
|
|
196
|
e-Tender/NBIDNNGPS/GAZ/KAP/2018-2019/W1-02145
|
BHATPARA RPS
|
NBIDNNGPS
|
kapasia
|
|
|
|
|
70.72
|
M/S M.R. Enterprise
|
67.19
|
|
|
|
10
|
|
|
|
|
197
|
e-Tender/NBIDNNGPS/GAZ/KAP/2018-2019/W1-02146
|
MASUK UTTAR PARA RPS
|
NBIDNNGPS
|
kapasia
|
|
|
|
|
71.48
|
M/s Momtaj Enterprise
|
67.90
|
|
|
|
0
|
|
|
|
|
198
|
e-Tender/NBIDNNGPS/GAZ/KAP/2018-2019/W1-02147
|
PAPLA CHAMURKHI GOVT. PRIMARY SCHOOL
|
NBIDNNGPS
|
kapasia
|
|
|
|
|
69.03
|
M/S Mukul construction
|
65.58
|
|
24/12/2018
|
|
10
|
|
|
|
|
199
|
e-Tender/NBIDNNGPS/GAZ/KAP/2018-2019/W1-02148
|
SULTANPUR RPS
|
NBIDNNGPS
|
kapasia
|
|
|
|
|
72.39
|
M/S Khan Traders
|
68.77
|
|
27/12/2018
|
|
10
|
|
|
|
|
200
|
e-Tender/NBIDNNGPS/GAZ/KAP/2018-2019/W1-02149
|
TALTOLA RPS
|
NBIDNNGPS
|
kapasia
|
|
|
|
|
70.25
|
M/S S.R. Enterprise
|
66.74
|
|
27/12/2018
|
|
15
|
|
|
|
|
201
|
e-Tender/NBIDNNGPS/GAZ/KAP/2018-2019/W1-02150
|
TARUN POSCHIM PARA RPS
|
NBIDNNGPS
|
kapasia
|
|
|
|
|
69.43
|
M/S Tasmia Talha Enterprise
|
65.96
|
|
|
|
0
|
|
|
|
|
202
|
e-Tender/NBIDNNGPS/GAZ/SRE/2017-2018/W1-00152
|
PURBO GAZIPUR
|
NBIDNNGPS
|
sreepur
|
|
|
|
|
68.92
|
M/S Rana Enterprise
|
62.02
|
|
03/04/2018
|
10/04/2019
|
91
|
|
|
|
|
203
|
e-Tender/NBIDNNGPS/GAZ/SRE/2017-2018/W1-00153
|
GAZIPUR DAKKIN PARA RPS
|
NBIDNNGPS
|
sreepur
|
|
|
|
|
52.55
|
M/S Rupali Construction
|
47.30
|
|
16/04/2018
|
23/04/2019
|
5
|
|
|
|
|
204
|
e-Tender/NBIDNNGPS/GAZ/SRE/2017-2018/W1-00154
|
GODARCHALA
|
NBIDNNGPS
|
sreepur
|
|
|
|
|
66.80
|
M/S Rupali Construction
|
61.92
|
|
16/04/2018
|
23/04/2019
|
70
|
|
|
|
|
205
|
e-Tender/NBIDNNGPS/GAZ/SRE/2017-2018/W1-00155
|
NIMAICHALA
|
NBIDNNGPS
|
sreepur
|
|
|
|
|
66.28
|
M/S Nahar Enterprise
|
62.81
|
|
11/04/2018
|
18/04/2019
|
80
|
|
|
|
|
206
|
e-Tender/NBIDNNGPS/GAZ/SRE/2017-2018/W1-00156
|
NIJ KHOJEKHANI GOVERNMENT PRIMARY SCHOOL
|
NBIDNNGPS
|
sreepur
|
|
|
|
|
71.22
|
M/S Nahar Enterprise
|
64.10
|
|
11/04/2018
|
18/04/2019
|
90
|
|
|
|
|
207
|
e-Tender/NBIDNNGPS/GAZ/SRE/2017-2018/W1-00157
|
KANOPUR GUCHOGRAM PRS
|
NBIDNNGPS
|
sreepur
|
|
|
|
|
69.78
|
M/Karim & Karim Enterprise
|
62.80
|
|
25/04/2018
|
02/05/2019
|
0
|
|
|
|
|
208
|
e-Tender/NBIDNNGPS/GAZ/SRE/2017-2018/W1-00548
|
SAILAT POSCHIM PARA RPS
|
NBIDNNGPS
|
sreepur
|
|
|
|
|
51.42
|
M/S Olive Enterprise
|
48.85
|
|
04/06/2018
|
11/06/2019
|
50
|
|
|
|
|
209
|
e-Tender/NBIDNNGPS/GAZ/SRE/2017-2018/W1-00608
|
BELTOIL
|
NBIDNNGPS
|
sreepur
|
|
|
|
|
69.05
|
M/S Rahima Enterprise
|
65.60
|
|
04/06/2018
|
11/06/2019
|
80
|
|
|
|
|
210
|
e-Tender/NBIDNNGPS/GAZ/SRE/2018-2019/W1-02156
|
INDRAPUR SOUTH PARA CHANBANU REG. PRIMARY SCHOOL
|
NBIDNNGPS
|
sreepur
|
|
|
|
|
70.49
|
M/S Trade Vox international
|
66.97
|
|
|
|
0
|
|
|
|
|
211
|
e-Tender/NBIDNNGPS/GAZ/SRE/2018-2019/W1-02157
|
KEWA POSCHIM KHANDO DORGARCHALA
|
NBIDNNGPS
|
sreepur
|
|
|
|
|
85.62
|
M/S Professor Builders
|
81.33
|
|
|
|
0
|
|
|
|
|
212
|
e-Tender/NBIDNNGPS/GAZ/SRE/2018-2019/W1-02158
|
CHAWBON
|
NBIDNNGPS
|
sreepur
|
|
|
|
|
83.79
|
M/S Nahar Enterprise
|
79.60
|
|
|
|
0
|
|
|
|
|
213
|
e-Tender/NBIDNNGPS/GAZ/SRE/2018-2019/W1-02159
|
HERA POTKA
|
NBIDNNGPS
|
sreepur
|
|
|
|
|
84.59
|
M/S AL- Fyroo Engineeing CO
|
80.36
|
|
|
|
0
|
|
|
|
|
214
|
e-Tender/NBIDNNGPS/GAZ/SRE/2018-2019/W1-02175
|
DOMRARI CHALA
|
NBIDNNGPS
|
sreepur
|
|
|
|
|
84.53
|
M/S Trade Vox international
|
80.30
|
|
|
|
0
|
|
|
|
|
215
|
e-Tender/NBIDNNGPS/GAZ/SRE/2018-2019/W1-02176
|
GAZIARON
|
NBIDNNGPS
|
sreepur
|
|
|
|
|
84.00
|
M/S Faysal Enterprise
|
79.80
|
|
|
|
0
|
|
|
|
|
216
|
e-Tender/NBIDNNGPS/GAZ/SRE/2018-2019/W1-02177
|
NEHALIA RNGPS
|
NBIDNNGPS
|
sreepur
|
|
|
|
|
69.08
|
M/S Nahar Enterprise
|
65.62
|
|
|
|
0
|
|
|
|
|
217
|
e-Tender/NBIDNNGPS/GAZ/SRE/2018-2019/W1-02178
|
CHAR DAMDAMA NON GOVT. PRIMARY SCHOOL
|
NBIDNNGPS
|
sreepur
|
|
|
|
|
72.57
|
M/S Sakib Enterprise
|
68.95
|
|
|
|
0
|
|
|
|
|
218
|
e-Tender/NBIDNNGPS/GAZ/SRE/2018-2019/W1-02179
|
MEHANDIPUR RPS
|
NBIDNNGPS
|
sreepur
|
|
|
|
|
70.53
|
M/S Almas Construction and Gas Co.
|
67.00
|
|
|
|
0
|
|
|
|
|
219
|
e-Tender/NBIDNNGPS/GAZ/SRE/2018-2019/W1-02180
|
2NO. NAYAPUAR RPS
|
NBIDNNGPS
|
sreepur
|
|
|
|
|
72.40
|
M/S Noha Enterprise
|
68.78
|
|
|
|
0
|
|
|
|
|
220
|
e-Tender/NBIDNNGPS/GAZ/SRE/2018-2019/W1-02181
|
BIDHAI ABDER BATANIYA RPS
|
NBIDNNGPS
|
sreepur
|
|
|
|
|
67.86
|
M/S T. A Traders
|
64.47
|
|
|
|
0
|
|
|
|
|
221
|
RERMP-3/GA ZI/W-43
|
Maintenance of Rural
Roads Gazipur ()
|
RERMP-3
|
gazipur-s
|
N/A
|
|
|
39
|
1277.50
|
N/A
|
1277.50
|
|
|
|
40
|
498.00
|
39
|
26/12/2021
|
|
222
|
397 & GAZ/ RPM-8
|
Rehabilitation and Periodic maintenance of Hotapara -Perojali Hatkhola Bazar Road (Ch.0+000-6+700km).
|
RTIP-2
|
gazipur-s
|
|
6.70
|
|
95
|
22892915.62
|
M/S Dhiman Construction, Kapasia, Gazipur
|
26162213.02
|
12/06/2013
|
18/06/2013
|
01/06/2014
|
98
|
|
95
|
01/01/2016
|
|
223
|
RTIP-II/GAZ/RPM-8
|
Hotapara-Perojali Hatkhola bazar
|
RTIP-2
|
gazipur-s
|
|
6.70
|
|
|
228.93
|
M/S. Dhiman Construction
|
265.83
|
|
18/06/2013
|
11/12/2014
|
100
|
|
|
|
|
224
|
RTIP-II/GAZ/RPM-108
|
Mirzapur GC-Bhabanipur bazar at Dhaka-Mymensingh NHW
|
RTIP-2
|
gazipur-s
|
|
2.30
|
|
|
95.32
|
M/S. Olive Enterprise
|
82.68
|
|
16/03/2014
|
07/12/2014
|
100
|
|
|
|
|
225
|
6280 & GAZ /UNR -14
|
Improvement of Mediasolay(Chapair UP) -Bangla Bazar Via Boraibari Paikpara Via Kotbari Chowrasta Bazar Road Chainage: 0-950-2+641km & 5+937-12+838km =8.592km.
|
RTIP-2
|
kaliakoir
|
|
8.59
|
|
52
|
58611225.00
|
MDC-MIT JV 163, Shopping Center (3rd floor, Gulshan-1, Dhaka-1212
|
64266918.92
|
27/05/2014
|
02/06/2014
|
01/12/2015
|
85
|
|
52
|
01/01/2016
|
|
226
|
RTIP-II/GAZ/UZR-11
|
Boardghar (R&H)-Chandabaha G.C.
|
RTIP-2
|
kaliakoir
|
|
10.78
|
|
|
1597.00
|
JV of M/S. Rafeea Construction & Shraboni Construction (M/S. Rafeea Construction-SC JV)
|
1821.85
|
|
20/09/2015
|
30/11/2018
|
100
|
|
|
|
|
227
|
RTIP-II/GAZ/UZR-62
|
Latifpur Bridge (R&H)-Vowel Mirzapur GC via Boraibari
|
RTIP-2
|
kaliakoir
|
|
6.70
|
|
|
1658.21
|
Western Engineering (Pvt.) Ltd
|
1632.91
|
|
14/08/2016
|
30/01/2019
|
100
|
|
|
|
|
228
|
RTIP-II/GAZ/UNR-14
|
Mediasolay (Chapair UP)-Bangla bazar Via Boraibari Paikpara Via kotbari Chowrasta Bazar
|
RTIP-2
|
kaliakoir
|
|
8.59
|
|
|
586.11
|
M/S. Dhiman Construction & M/S. Islam Traders Joint Venture (MDC-MIT JV)
|
640.35
|
|
02/06/2014
|
29/03/2016
|
100
|
|
|
|
|
229
|
RTIP-II/GAZ/RPM-109
|
b) R&H Boliadi Bazar-Dhantara G.C via Dhaljora UP road
|
RTIP-2
|
kaliakoir
|
|
5.27
|
|
|
161.99
|
|
0.00
|
|
14/02/2014
|
10/06/2015
|
100
|
|
|
|
|
230
|
RTIP-II/GAZ/RPM-202
|
Safipur-Boraibari Road
|
RTIP-2
|
kaliakoir
|
|
9.27
|
|
|
479.44
|
M/S. Hanif Enterprise
|
415.84
|
|
28/07/2015
|
05/03/2017
|
100
|
|
|
|
|
231
|
RTIP-II/GAZ/RPM-351
|
Boardghar (R&H)-Chandabaha G.C.
|
RTIP-2
|
kaliakoir
|
|
4.52
|
|
|
287.60
|
M/S. Dhiman Construction
|
244.50
|
|
14/04/2017
|
30/06/2018
|
90
|
|
|
|
|
232
|
392 & GAZ/ RPM-7-7.2
|
Rehabilitation and Periodic maintenance of Kaliganj- Kapasia Road (Ch.6+600-16+100km).
|
RTIP-2
|
kaliganj
|
|
9.50
|
|
100
|
19450410.75
|
M/S Amzad Traders, Kaliganj, Gazipur.
|
18844769.98
|
06/12/2013
|
18/06/2013
|
15/04/2014
|
100
|
100.00
|
100
|
01/01/2016
|
|
233
|
7411 & GAZ/ UNR-15
|
Improvement of (a) Muktarpur UP - Moisher Bazar via Chopair, Dolan Bazar Road. (Ch.0+000-1+490 km & 16+220 -17+ 860 km) Total Length= 3.130km. (b) Rajendra pur Prahladpur via Lohagachia Road (Ch.5+000 - 9+812 km) Total Length =4.812 km.
|
RTIP-2
|
kaliganj
|
|
7.94
|
|
29
|
54785219.00
|
MDC-MIT JV 163, Shopping Center (3rd floor, Gulshan-1, Dhaka-1212
|
53444309.61
|
20/07/2014
|
24/07/2014
|
23/01/2016
|
50
|
|
29
|
01/01/2016
|
|
234
|
RTIP-II/GAZ/UNR-15
|
a) Muktarpur UP-Moisher Bazar via Chopair, Dollan Bazar Road
|
RTIP-2
|
kaliganj
|
|
3.13
|
|
|
225.80
|
M/S. Dhiman Construction & M/S. Islam Traders Joint Venture (MDC-MIT JV)
|
534.44
|
|
24/07/2014
|
30/07/2018
|
100
|
|
|
|
|
235
|
RTIP-II/GAZ/RPM-7.2
|
Kaliganj-Kapasia
|
RTIP-2
|
kaliganj
|
|
9.50
|
|
|
194.50
|
M/S. Amzad Traders
|
200.20
|
|
18/06/2013
|
15/04/2014
|
100
|
|
|
|
|
236
|
RTIP-II/GAZ/RPM-110
|
b) Kaligonj-Jangalia road
|
RTIP-2
|
kaliganj
|
|
6.50
|
|
|
175.83
|
|
0.00
|
|
10/02/2014
|
14/01/2016
|
100
|
|
|
|
|
237
|
RTIP-II/GAZ/GCM-31
|
Improvement of Shaoraid GCM
|
RTIP-2
|
kaliganj
|
|
1.00
|
|
|
132.91
|
M/S. Alam Traders
|
129.52
|
|
25/11/2015
|
30/11/2017
|
80
|
|
|
|
|
238
|
RTIP-II/GAZ/RJ-1
|
b) Shaheed Moyezuddin ferry ghat
|
RTIP-2
|
kaliganj
|
|
2.00
|
|
|
126.27
|
|
0.00
|
|
21/12/2015
|
30/03/2018
|
100
|
|
|
|
|
239
|
RTIP-II/GAZ/RPM-203
|
Jangalia GC-Jamalpur GC Road
|
RTIP-2
|
kaliganj
|
|
8.42
|
|
|
334.54
|
M/S. Amzad Traders
|
287.93
|
|
02/11/2015
|
30/12/2016
|
100
|
|
|
|
|
240
|
RTIP-II/GAZ/RPM-290
|
Kaligonj-Jamalpur-Showraid-Kalihasi-Taraganj (Raniganj) Road (From RHD #10)
|
RTIP-2
|
kaliganj
|
|
14.69
|
|
|
701.90
|
M/S. M.R. Construction, M/S. Amzad Traders & M/S. Rahman Brothers JV [(MRC-AMZAD-RB JV)]
|
638.63
|
|
15/09/2016
|
26/11/2017
|
100
|
|
|
|
|
241
|
RTIP-II/GAZ/RPM-350
|
Jangalia-Dhuburia Rd.
|
RTIP-2
|
kaliganj
|
|
5.22
|
|
|
238.01
|
M/S. Zaman Construction
|
206.90
|
|
05/02/2017
|
28/12/2017
|
6
|
|
|
|
|
242
|
398 & GAZ/ RPM-9-9.1
|
Rehabilitation and Periodic maintenance of kapasia GC- Monohordi Road (Ch.0+000 7+100km)
|
RTIP-2
|
kapasia
|
|
7.10
|
|
85
|
21850761.65
|
M/S Dhiman Construction, Kapasia, Gazipur
|
20676833.64
|
12/06/2013
|
18/06/2013
|
01/06/2014
|
100
|
|
85
|
01/01/2016
|
|
243
|
2625 & GAZ/ RPM-110
|
Maintenance of (a) Kapasia Union H/Q- Chandpur Union H/Q Road (Ch.0+000 -7+400km) & (b) Kaliganj -jangalia Road (Ch.0+000 -6+500km)
|
RTIP-2
|
kapasia
|
|
13.90
|
|
|
48882298.00
|
M/S Hanif Enterprise, Station Road, Faridpur.
|
49685065.00
|
06/02/2014
|
10/02/2014
|
|
100
|
90.00
|
|
01/01/2016
|
|
244
|
RTIP-II/GAZ/UNR-16
|
Singhasree Union H/Q-Amraid bazar via Sohagpurbazar Road
|
RTIP-2
|
kapasia
|
|
11.20
|
|
|
720.45
|
M/S. Dhiman Construction & M/S. Islam Traders JV (MDC-MIT JV)
|
688.91
|
|
30/06/2014
|
29/12/2016
|
100
|
|
|
|
|
245
|
RTIP-II/GAZ/RPM-9.1
|
Kapasia GC-Monohordi
|
RTIP-2
|
kapasia
|
|
7.10
|
|
|
218.51
|
M/S. Dhiman Construction
|
205.66
|
|
18/06/2013
|
15/11/2014
|
100
|
|
|
|
|
246
|
RTIP-II/GAZ/RPM-9.2
|
Kapasia GC-Monohordi
|
RTIP-2
|
kapasia
|
|
6.90
|
|
|
243.06
|
M/S. Dhiman Construction
|
227.97
|
|
18/06/2013
|
15/11/2014
|
100
|
|
|
|
|
247
|
RTIP-II/GAZ/RPM-110
|
a) Kapasia Union H/Q-Chandpur Union H/Q road
|
RTIP-2
|
kapasia
|
|
7.40
|
|
|
312.99
|
M/S. Hanif Enterprise
|
516.69
|
|
10/02/2014
|
14/01/2016
|
100
|
|
|
|
|
248
|
RTIP-II/GAZ/RPM-204
|
Singhasree Union H/Q-Pachua bazar Rd.
|
RTIP-2
|
kapasia
|
|
13.70
|
|
|
493.05
|
JV of M/S. Amzad Traders & M/S. Rahman Brothers (AMTRB JV)
|
439.73
|
|
02/11/2015
|
06/02/2017
|
100
|
|
|
|
|
249
|
RTIP-II/GAZ/RPM-291
|
Taragonj bazar-Ghatkuri bazar Rd.
|
RTIP-2
|
kapasia
|
|
6.37
|
|
|
314.76
|
A.A Trading Construction
|
264.51
|
|
12/09/2016
|
12/09/2017
|
65
|
|
|
|
|
250
|
RTIP-II/GAZ/UZR-10
|
Goshinga-Rajabari
|
RTIP-2
|
sreepur
|
|
7.25
|
|
|
1077.14
|
Western Engineering (Pvt.) Ltd
|
1005.23
|
|
09/05/2016
|
31/12/2017
|
100
|
|
|
|
|
251
|
RTIP-II/GAZ/UNR-15
|
b) Rajendrapur-Prahladpur via Lohagachia
|
RTIP-2
|
sreepur
|
|
4.81
|
|
|
322.06
|
|
0.00
|
|
24/07/2014
|
30/07/2018
|
100
|
|
|
|
|
252
|
RTIP-II/GAZ/UNR-17
|
Sreepur-Kawraid
|
RTIP-2
|
sreepur
|
|
10.12
|
|
|
713.75
|
N. Amin & Sons Limited
|
701.17
|
|
10/06/2014
|
30/06/2017
|
86
|
|
|
|
|
253
|
RTIP-II/GAZ/RPM-109
|
a) Goshinga-Kapasia road
|
RTIP-2
|
sreepur
|
|
5.50
|
|
|
104.38
|
M/S. Amzad Traders
|
265.56
|
|
14/02/2014
|
10/06/2015
|
100
|
|
|
|
|
254
|
RTIP-II/GAZ/RJ-1
|
a) Bormi Bazar ghat
|
RTIP-2
|
sreepur
|
|
2.00
|
|
|
75.75
|
M/S. Faruk Traders
|
232.93
|
|
21/12/2015
|
30/03/2018
|
100
|
|
|
|
|
255
|
RTIP-II/GAZ/UNR-17-STR-3
|
Construction of 75m long RCC bridge on Sreepur-Kawraid road at Ch. 6+620 km
|
RTIP-2
|
sreepur
|
|
75.00
|
|
|
346.16
|
M/S. Nayed Ali Khan & Bachchu JVCA
|
297.35
|
|
21/04/2015
|
15/06/2017
|
75
|
|
|
|
|
256
|
RTIP-II/GAZ/RPM-275
|
Sreepur-Barmi Bazar
|
RTIP-2
|
sreepur
|
|
2.00
|
|
|
499.30
|
M/S. Hamim International
|
118.04
|
|
03/12/2015
|
02/11/2017
|
100
|
|
|
|
|
257
|
RTIP-II/GAZ/RPM-275A
|
Sreepur-Barmi Bazar
|
RTIP-2
|
sreepur
|
|
5.00
|
|
|
1230.83
|
Al Amin Construction Co. Ltd. & Kingdom Builders Limited, (Al-Amin- Kingdom- JVA)
|
984.60
|
|
10/08/2017
|
09/05/2018
|
50
|
|
|
|
|
258
|
RTIP-II/GAZ/RPM-349
|
Bormi-Nayanpur
|
RTIP-2
|
sreepur
|
|
16.44
|
|
|
618.68
|
Western Engineering (Pvt.) Ltd
|
553.24
|
|
19/03/2017
|
30/01/2019
|
100
|
|
|
|
|
259
|
RTIP-II/GAZ/RPM-393
|
Bormi GC - Pachoua Hazi Bazar via Singhasree UPC (Sreepur part)
|
RTIP-2
|
sreepur
|
|
1.80
|
|
|
184.52
|
M/S. Dhiman Construction
|
156.92
|
|
18/04/2017
|
30/06/2018
|
95
|
|
|
|
|
260
|
W.37
|
Construction of Vaowalgor UP Complex
|
UCCP-2
|
gazipur-s
|
|
|
|
0
|
129.94
|
|
119.27
|
24/10/2019
|
|
30/06/2020
|
0
|
0.00
|
0
|
20/08/2020
|
|
261
|
149/246
|
Construction of KONABARI UP
|
UCCP-2
|
gazipur-s
|
|
|
|
100
|
59.00
|
|
58.87
|
10/08/2010
|
|
15/06/2011
|
100
|
58.87
|
100
|
16/07/2020
|
|
262
|
W.302
|
Construction of Atabaha UP Complex
|
UCCP-2
|
kaliakoir
|
|
|
|
100
|
86.68
|
|
90.93
|
23/06/2013
|
|
27/09/2014
|
100
|
90.92
|
100
|
20/08/2020
|
|
263
|
W.166
|
Construction of Boali UP Complex
|
UCCP-2
|
kaliakoir
|
|
|
|
100
|
87.14
|
|
91.50
|
23/06/2013
|
|
27/09/2014
|
100
|
91.24
|
100
|
20/08/2020
|
|
264
|
150/246
|
Construction of KALIAKOIR UP
|
UCCP-2
|
kaliakoir
|
|
|
|
100
|
35.86
|
|
37.62
|
07/04/2011
|
|
04/08/2012
|
100
|
37.52
|
100
|
16/07/2020
|
|
265
|
W.157
|
Construction of Chandpur UP Complex
|
UCCP-2
|
kapasia
|
|
|
|
100
|
83.31
|
|
87.29
|
12/03/2013
|
|
30/06/2017
|
100
|
87.17
|
100
|
20/08/2020
|
|
266
|
W.023
|
Construction of Korihata UP Complex
|
UCCP-2
|
kapasia
|
|
|
|
75
|
92.30
|
|
87.14
|
07/12/2015
|
|
30/06/2017
|
95
|
67.63
|
75
|
20/08/2020
|
|
267
|
W.55
|
Construction of Kapasia UP Complex
|
UCCP-2
|
kapasia
|
|
|
|
0
|
171.38
|
|
171.07
|
24/10/2019
|
|
31/05/2020
|
20
|
0.00
|
0
|
20/08/2020
|
|
268
|
W.286
|
Construction of Goshinga UP Complex
|
UCCP-2
|
sreepur
|
|
|
|
100
|
83.30
|
|
79.13
|
14/01/2013
|
|
30/06/2016
|
100
|
79.12
|
100
|
20/08/2020
|
|
269
|
CBU-100/ Purto-12
|
গাজীপুর জেলার সদর উপজেলাধীন বাজেন্দ্রপুর -মির্জাপুর সড়কে তরাগ নদীর উপর PSC সেতু (রোড আইডিঃ ৩৩৩৩০২০০৫)
|
UHBP
|
gazipur-s
|
333302005
|
|
0.00
|
100
|
842.06
|
DAE-UDC (JV), 554, West Nakhal para, Shaheenbag, Dhaka.
|
275.56
|
25/03/2020
|
|
12/12/2024
|
100
|
275.56
|
100
|
28/06/2024
|
|
270
|
CBU-100/ Purto-12(A)
|
গাজীপুর জেলার সদর উপজেলাধীন রাজেন্দ্রপুর -মির্জাপুর সড়কে ৬১৪০মিটার চেইনেজে তুরাগ নদীর উপর অসমাপ্ত সেতু নির্মাণ (রোড আইডিঃ ৩৩৩৩০২০০৫)
|
UHBP
|
gazipur-s
|
333302005
|
|
90.00
|
0
|
631.45
|
M/S. Musfiqur Rahman (Kanchan)
737, abir house, Solakia, Kishoreganj.
|
598.81
|
19/06/2023
|
|
12/12/2024
|
48
|
111.61
|
0
|
28/06/2024
|
|
271
|
CBU-100/ Purto-352
|
গাজীপুর জেলার কালিয়াকৈর উপজেলাধীন দেওয়াইর বাজার-মহরাবহ সড়কে আশাপুর ইস্্রাফিলের দোকান হতে আশাপুর গ্রামের আলহাজ¦ ফজর আলী মাষ্টারের সড়কে ২৫০০মিটার চেইনেজে (রোড আইডি-৩৩৩৩২৪০১৭) সেতু নির্মাণ।
|
UHBP
|
kaliakoir
|
333324017
|
|
54.00
|
0
|
578.81
|
Orient Trade International.17/18 Akhoy das Lane, Gendariya, Sutrapur, Dhaka-1204.
|
557.37
|
12/12/2021
|
|
30/04/2023
|
100
|
474.41
|
0
|
28/06/2024
|
|
272
|
CBU-100/ Purto-353
|
গাজীপুর জেলার কালিয়াকৈর উপজেলাধীন শালদহ ব্রিজের গোড়া হতে কাথাচুরা সরকারী প্রাথমিক বিদ্যালয় সড়কে (রোড আইডি-৩৩৩৩২৪০২৯) সেতু নির্মাণ।
|
UHBP
|
kaliakoir
|
333324029
|
|
31.00
|
0
|
416.21
|
M/S. Mostafa Kamal.
Niaz park, Kawtali, B.baria-3400.
|
399.01
|
24/01/2022
|
|
31/12/2024
|
95
|
327.52
|
0
|
28/06/2024
|
|
273
|
CBU-100/ Purto-475
|
Access Road to the Construction of 54m long RCC Girder Bridge on Deowaire Bazar Mohoraboh road from Ashapur Israfil's Shop to Alhaj Fojor Ali Master's road of Ashapur Village at Ch. 2500m. (Road ID 333324017) Upazila: Kaliakoir, District: Gazipur. (Total
|
UHBP
|
kaliakoir
|
333324017
|
0.38
|
0.00
|
0
|
159.46
|
M/S. Shammi Builders
|
143.52
|
01/01/1900
|
|
|
0
|
0.00
|
0
|
28/06/2024
|
|
274
|
CBU-100/ Purto-14
|
গাজীপুর জেলার কালীগঞ্জ উপজেলাধীন কালীগঞ্জ হেডকোয়ার্টার হতে নোন বাজার ভায়া বক্তারপুর বাজার রাস্তায় ৬০৫০ মিটার চেইনেজে RCC ব্রিজ নির্মাণ (রোড আইডিঃ ৩৩৩৩৪২০০৩)
|
UHBP
|
kaliganj
|
333342003
|
|
45.00
|
0
|
445.38
|
MTB-MME (JV), Pall Bari Road, Sadar, Jhalakathi.
|
417.33
|
28/01/2020
|
|
14/03/2024
|
100
|
391.76
|
0
|
28/06/2024
|
|
275
|
CBU-100/ Purto-351
|
ক) গাজীপুর জেলার কালিগঞ্জ উপজেলাধীন নয়াবাজার (রাজনগর বাজার)- জয়রামবেড় সড়কে ২৭৩৫মি. চেইনেজে (রোড আইডি-৩৩৩৩৪৫০৯৭) সেতু নির্মাণ ।
|
UHBP
|
kaliganj
|
333345097
|
|
36.00
|
0
|
511.33
|
Mohammed Eunus & Brothers (Pvt.) Ltd.
|
721.59
|
01/03/2022
|
|
15/04/2024
|
60
|
424.61
|
0
|
28/06/2024
|
|
276
|
|
খ) গাজীপুর জেলার কালিগঞ্জ উপজেলাধীন নাগরী ইউপি -নাওটানা সওজ ভায়া পেট্রোবাংলা কামতা গ্যাস ফিল্ড সড়কে কেটুুন কেণেলের উপর ১৭৮০মি. চেইনেজে (রোড আইডি-৩৩৩৩৪৩০০৬) সেতু নির্মাণ ।
|
UHBP
|
kaliganj
|
333343006
|
|
20.00
|
0
|
252.26
|
|
0.00
|
01/01/1900
|
|
|
94
|
0.00
|
0
|
28/06/2024
|
|
277
|
CBU-100/ Purto-15
|
গাজীপুর জেলার কাপাসিয়া উপজেলাধীন ভিটীপাড়া-কুড়িয়াদী মাহা ব্যাপারীর বাড়ীর নিকট হাড়ি খালের উপর ২০০০ মিটার চেইনেজে RCC সেতু নির্মাণ (রোড আইডিঃ ৩৩৩৬৪১১৩)
|
UHBP
|
kapasia
|
33364113
|
|
20.00
|
0
|
272.59
|
MTB-MME (JV), Pall Bari Road, Sadar, Jhalakathi.
|
232.72
|
28/01/2020
|
|
15/05/2022
|
100
|
232.40
|
0
|
28/06/2024
|
|
278
|
CBU-100/ Purto-16
|
গাজীপুর জেলার কাপাসিয়া উপজেলাধীন রায়েদ ইউনিয়ন হেড কোয়াটার-দুলালপুর বাজার ভায়া মৈশন মিয়ার বাজার সড়কে ৮৫০০ মিটার চেইনেজে সেতু নির্মাণ (রোড আইডিঃ ৩৩৩৩৩০০১)
|
UHBP
|
kapasia
|
33333001
|
|
36.00
|
0
|
406.57
|
Md. Khairul Kabir Rana,S.M.C Road, Guptapara, Rangpur.
|
383.46
|
25/03/2020
|
|
18/03/2022
|
100
|
375.45
|
0
|
28/06/2024
|
|
279
|
CBU-100/ Purto-17
|
গাজীপুর জেলার কাপাসিয়া উপজেলাধীন টোক ইউনিয়ন হেড কোয়াটার-সিংগুয়া বাজার সড়কে ৫১০০ মিটার চেইনেজ PSC সেতু নির্মাণ (রোড আইডিঃ ৩৩৩৩৬৩০১০)
|
UHBP
|
kapasia
|
333363010
|
|
27.00
|
0
|
327.77
|
Rana Builders (Pvt.) Ltd. & M/S. A.B.M. Delwar Hosain (JV)
|
305.53
|
10/02/2020
|
|
14/08/2021
|
100
|
294.59
|
0
|
28/06/2024
|
|
280
|
CBU-100/ Purto-19
|
গাজীপুর জেলার শ্রীপুর উপজেলাধীন রাজাবাড়ী জিসি-জিসি অফিস আরএইচডি ভায়া ডুমনি বাজার সড়কে ১২৫৫০ মিটার চেইনেজে RCC সেতু নির্মান (রোড আইডিঃ৩৩৩৮৬২০২২)
|
UHBP
|
sreepur
|
333862022
|
|
0.00
|
100
|
553.63
|
DAE-UDC (JV), 554, West Nakhal para, Shaheenbag, Dhaka.
|
205.25
|
22/01/2020
|
|
04/03/2025
|
100
|
205.25
|
100
|
28/06/2024
|
|
281
|
CBU-100/ Purto-19(A)
|
গাজীপুর জেলার শ্রীপুর উপজেলাধীন রাজাবাড়ী জিসি-জিসি অফিস আরএইচডি ভায়া ডুমনি বাজার সড়কে ১২৫৫০ মিটার চেইনেজে অসমাপ্ত সেতু নির্মান (রোড আইডিঃ৩৩৩৮৬২০২২)
|
UHBP
|
sreepur
|
333862022
|
|
60.00
|
0
|
301.71
|
M/S. Bhati Bangla Enterprise, 750, Uakilpara, Kishoreganj.
|
297.12
|
06/06/2023
|
|
04/12/2024
|
90
|
240.59
|
0
|
28/06/2024
|
|
282
|
CBU-100/ Purto-20
|
গাজীপুর জেলার শ্রীপুর উপজেলাধীন শ্রীপুর জিসি -গয়েশপুর জিসি ভায়া কাওরাইদ-ইউপিসি সড়কে ১৩০০০ মিটার চেইনেজে (রোড আইডিঃ ৩৩৩৮৬২০১৮) সেতু নির্মাণ।
|
UHBP
|
sreepur
|
333862018
|
|
96.00
|
0
|
952.89
|
ASCL & RCCL (JV). H-39, R-6, B-C, Niketon, Gulshan, Dhaka.
|
880.00
|
23/01/2022
|
|
20/12/2024
|
67
|
468.78
|
0
|
28/06/2024
|
|
283
|
UTMIDP- KAPA/ GAZI/ WR-62
|
1. Improvement of Bituminous Carpeting Road from Kapasia-Kaliganj RHD (Banarhawla Kadamtala) College Road near Subud Professor house at Ch. 00m-675m Under Kapasia Upazila, Dist: Gazipur. (Road ID:333365290) 2. Improvement of Bituminous Carpeting Road from Kapasia Shitalakha Hospital– Dhaka–Kapasia RHD via Kolmartek Bazlu Master Bari Road at Ch. 00m-1215m Under Kapasia Upazila, Dist: Gazipur. (Road ID: 333365289)
|
UTMIDP
|
kapasia
|
|
1.89
|
|
|
139.99
|
M/S Sharafat Enterprise
|
134.08
|
|
|
|
0
|
|
|
08/12/2019
|
|