1
|
CIB-Dha-W-05
|
Const. of 105m long PSC Girder Bridge over Dhaleshwari Branch river on Dhaka-Aricha Highway at Kalia to Araria road (Kella RHD-Vum Dakkhin Joyomontop GC) at Ch. 9000m,
|
CIBRR
|
dhamrai
|
326142010
|
|
105.00
|
100
|
896.48
|
Prakushal Projukti Ltd. House#C10, Road#4,B, Banasree,Rampura,Dhaka-1219.
|
935.03
|
17/09/2018
|
23/09/2018
|
13/10/2022
|
100
|
843.60
|
100
|
05/02/2025
|
|
2
|
CIB-Dha-W-51
|
Const.of 252m long RCC BOX Girder ( 100m RCC Viaduct) Bridge over Dhaleshwari-2 river on Dhaka-Mowwa at Thaghoria-Shaper Bazar via Deber Bazar & Mollar Hat road at Ch.5540m under Upazilla: Keraniganj, District: Dhaka
|
CIBRR
|
keraniganj
|
[Road ID: 326382005]
|
|
252.00
|
69
|
3262.51
|
M/S Surma Enterprise and Muhammad Aminul Haque(PVT)ltd(JV)
|
3327.42
|
31/05/2018
|
06/06/2018
|
09/11/2023
|
70
|
2285.68
|
69
|
05/02/2025
|
|
3
|
CIB-Dha-W-51(b)
|
Const.of 100m Viaduct on 252m long RCC BOX Girder Bridge Bridge over Dhaleshwari-2 river on Dhaka-Mowwa at Thaghoria-Shaper Bazar via Bibir Bazar & Mollar Hat road at Ch.5540m under Upazilla: Keraniganj, District: Dhaka
|
CIBRR
|
keraniganj
|
326382005
|
|
100.00
|
35
|
1677.54
|
KINGDOM BUILDERS LIMITED
|
1677.54
|
23/01/2022
|
30/01/2022
|
01/01/2025
|
37
|
599.20
|
35
|
05/02/2025
|
|
4
|
CIB-Dha-W-106
|
Const. of 90m long PSC Girder Bridge over Ichamoti river on Horishkul bazaar (at Kolakopa UP office)-Jontrail UP office-Dhapari Bazar-Gobindopur Bilpolli-Bangla bazaar road at Ch.2230m under Nababganj Upazila, District: Dhaka
|
CIBRR
|
nawabganj
|
[Road ID: 326623003
|
|
90.00
|
88
|
610.03
|
M/S. Kohinoor and Khosheda Enterprise(JV
|
614.00
|
28/03/2018
|
03/04/2018
|
30/12/2022
|
96
|
541.54
|
88
|
05/02/2025
|
|
5
|
CIB-Dha-W-63
|
Const. of 250m long PSC Girder Bridge over Bongshi river on Dhaka-Aricha (RHD) 22 Mile Shimulia GC via Nolam road at Ch. 3500m under Savar Upazila District: Dhaka
|
CIBRR
|
savar
|
326722005
|
|
250.00
|
76
|
2051.62
|
M/S Kohinur and Khosheda Enterprise(JV)
|
2153.17
|
11/03/2019
|
17/03/2019
|
30/06/2025
|
78
|
1655.70
|
76
|
05/02/2025
|
|
6
|
CIB-Dha-W-125
|
"Const. of 498m long Bridge (Prottasha) over Turag River on Banglabazar lcharkandi road at Ch. 0.00m under Upazila:Savar, District: Dhaka [Road ID: 326724079]
CIB-Dha-W-125"
|
CIBRR
|
savar
|
326724079
|
|
498.00
|
77
|
6831.38
|
NATIONAL DEVELOPMENT ENGINEERING LTD, House No.22, Road NO. 04, Block-C, Banani,Dhaka-1213.
|
6800.00
|
24/10/2022
|
31/10/2022
|
15/10/2025
|
78
|
5257.01
|
77
|
05/02/2025
|
|
7
|
CRDP-II/LGED/DHAKA/SAVAR/NCB/2018/W-03
|
i) Improvement of Kornapara - Nama Genda Road (Ch. 0-2770m) (Road ID # 326724016) including 80m Link Road.ii) Construction of 51m Long RCC Girder Bridge at Ch. 2580m on Kornapara - Nama Genda Road (Road ID # 326724016), iii) Construction of RCC drain along the Kornapara - Nama Genda Road (Ch. 0-250m & Ch.1450-2560m) (Road ID #326724016) , iv) Improvement of Dhaka-Aricha RHD at Savar Upazila H/Q - Shadhapur -Bongaon UP Road (Ch.0 - 4675m) (Road ID # 326723001) including 360m Link Road.v) Construction of 42m Long RCC Girder Bridge at Ch. 2800m on Dhaka-Aricha RHD at Savar Upazila H/Q - Shadhapur -Bongaon UP Road (Road ID # 326723001), vi) Construction of RCC drain along the Dhaka-Aricha RHD at Savar Upazila H/Q - Shadhapur -Bongaon UP Road (Ch.0-1825m) (Road ID #326723001) including 380m Link Drain.vii) Improvement of Shadhapur Ishrafil Haoladader's House - Goperbari - Razashon Bridge Road (Ch.0-2170m) (Road ID # 326724057), viii) Construction of RCC drain along the Shadhapur Ishrafil Haoladader's House - Goperbari - Razashon Bridge Road (Ch.1630-2170m) (Road ID #326724057)
|
CRDP-2
|
savar
|
326724016, 326723001, 326724057
|
9.93
|
93.00
|
0
|
4966.33
|
Modern Structures Ltd.
|
4761.46
|
04/11/2019
|
|
12/03/2021
|
5
|
476.15
|
0
|
30/06/2020
|
|
8
|
CRDP-II/LGED/DHAKA/SAVAR/NCB/2018/W-04
|
i) Improvement of Balivadhra GC - Dhamshona UP - Simulia UP Road (Ch. 770-6180m) (Road ID # 326723025); ii) Construction of 5 nos. Box Culvert (2.0m x 2.5m) at Ch.1880m, Ch.2430m, Ch.2540m, Ch.2710m & Ch.3220m on Balivadhra GC - Dhamshona UP - Simulia UP Road (Road ID # 326723025); iii) Construction of 3 x 5.00m x 5.00m Box Culvert at Ch. 5100m on Balivadhra GC - Dhamshona UP - Simulia UP Road (Road ID # 326723025); iv) Construction of RCC drain along the Balivadhra GC - Dhamshona UP - Simulia UP Road (Ch.770-1215m) (Road ID # 326723025); v) Improvement of Nabinagar - Kaliakoir RHD - Kaichabari Road (Ch. 460-2122m) (Road ID # 326724288); vi) Construction of 3 x 5.0m x 5.0m Box Culvert at Ch. 925m on Nabinagar - Kaliakoir RHD - Kaichabari Road (Road ID # 326724288); vii) Improvement of Polashbari - Kaichabari - Dogortoli Road (Ch.0-3950m) (Road ID # 326724096) including 493m link Road, viii) Construction of 2.0m x 2.5m Box Culvert at Ch.1260m on Polashbari - Kaichabari - Dogortoli Road (Road ID # 326724096), ix) Construction of 3 nos. Box Culvert (1.0m x 1.2m) at Ch:3420m, Ch.3570m & Ch.3620m on Polashbari - Kaichabari - Dogortoli Road (Road ID # 326724096), x) Improvement of Ghorapir High School - Bashbari Primary School Road (Ch.0-1772m) (Road ID # 326724047); xi) Construction of 1.00m x 1.20m Box Culvert at Ch. 410m on Ghorapir High School - Bashbari Primary School Road (Road ID # 326724047)
|
CRDP-2
|
savar
|
326723025, 326724288, 326724096, 326724047
|
13.29
|
46.00
|
10
|
2940.89
|
M. M. Builders & Engineers Ltd-Fast Build JV
|
3081.64
|
16/03/2020
|
30/03/2020
|
|
0
|
308.16
|
10
|
30/06/2020
|
|
9
|
CRMIDP/DHK/W-289
|
Kushora Bazar
|
CRMIDP
|
dhamrai
|
|
|
|
|
332.00
|
M/S Ifad Enterprise
|
284.69
|
06/12/2020
|
|
05/06/2022
|
40
|
|
|
26/07/2022
|
|
10
|
CRMIDP/DHK/W-290
|
Palamgonj
|
CRMIDP
|
dohar
|
|
|
|
23
|
298.00
|
"M/S. Manir & Co and M/S. Joyti Traders (JV) Nurpur, Dohar Pouroshova, Dohar, Dhaka. "
|
260.38
|
04/04/2020
|
|
04/11/2022
|
40
|
60.00
|
23
|
26/07/2022
|
|
11
|
GDP-3/D-3
|
Improvement of Ghorakanda-Gopalkrisnapur road via Chouna GPS at Ch.00-2080m under Upazila Dhamrai Dist: Dhaka. Road ID: 326145028.
|
GDP-3
|
dhamrai
|
|
2.08
|
|
|
144.22
|
M/S. Khosheda Enterprise
|
137.01
|
|
28/06/2018
|
05/06/2019
|
70
|
|
|
28/06/2022
|
|
12
|
GDP-3/D-20
|
Improvement of Joypura-Bansshor Munsirs house to Azahar Chairman house via Lal mia house Road at Ch 00-2240m under Dhamrai Upazila Dhaka. Road ID no 326145076.
|
GDP-3
|
dhamrai
|
|
2.24
|
|
|
162.60
|
M/S. Zaman Enterprise
|
154.47
|
|
10/09/2018
|
15/09/2019
|
100
|
|
|
28/06/2022
|
|
13
|
GDP-3/D-23
|
A) Improvement of Tetail-Dakaitmara at (Ch.2500-3500m) Under Upazila Dhamrai, Dist- Dhaka. Road ID No.326144004. B) Improvement of Balia RHD to Balia High school Road at (Ch.00-1000m) Under Upazila Dhamrai, Dist- Dhaka. Road ID No.3326144039
|
GDP-3
|
dhamrai
|
|
2.00
|
|
|
152.52
|
M/S. Israt Builders
|
144.89
|
|
|
|
100
|
|
|
28/06/2022
|
|
14
|
GDP-3/D-27
|
1. Construction of 45m Long PC Girder bridge Over Gazikhali Khal Near Naogaon HIgh School at (Ch. 7+800km) Under Upazila: Dhamrai, District: Dhaka. ID No. 326142011.
|
GDP-3
|
dhamrai
|
|
45.00
|
|
|
458.20
|
M/S Joint Bricks Traders
|
421.54
|
|
|
|
90
|
|
|
28/06/2022
|
|
15
|
GDP-3/D-28
|
2. Construction of 98.10m Long PC Girder bridge Over Banshai River on Kalampur UZR at Sombug GPS-Dhamrai RHD via Asulia Road at 0+200km Under Upazila: Dhamrai, District: Dhaka. ID No. 326144125.
|
GDP-3
|
dhamrai
|
|
98.10
|
|
|
617.04
|
M/S Surma & Khosheda Enterprise JV
|
570.06
|
|
|
|
70
|
|
|
28/06/2022
|
|
16
|
GDP-3/D-29
|
Constuction of 75m Long PC Girder Bridge over Bangshi River on Depashai Shantir Dokan-Noapar Khalifa Bari Road-ShaburJoypara GC-Majhir Char Bazar-Kutubpur-Debinagar-Kulachari-Kazir Char R&H Road at Ch.1150m under Upazila Dhamrai District Dhaka Road ID No.
|
GDP-3
|
dhamrai
|
|
|
75.00
|
|
489.16
|
Noona Traders-Fast Build JV
|
453.70
|
|
|
|
85
|
|
|
28/06/2022
|
|
17
|
GDP-3/D-40
|
a) Improvement of Chapil River Ghat-Chapil Road by BC at Ch.00-2170m under Upazila Dhamrai District Dhaka Road ID No. 326145010. b) Improvement of Chapil-Nawagaon Road by BC at ch. 00-1500m under Upazila Dhamrai, District Dhaka Road ID No. 326145008. c) Improvement of Amta UP Office (Rafiq shop) to Saturia Upazila H/Q (Dhamrai Portion) Road by BC at Ch.00-2200m under Upazila Dhamrai District Dhaka Road ID No. 326143023.
|
GDP-3
|
dhamrai
|
|
3.67
|
|
|
473.17
|
Fast Builders
|
472.88
|
|
|
|
70
|
|
|
28/06/2022
|
|
18
|
GDP-3/D-93
|
Construction of 54.00m Long RCC Girder Bridge on Jalsa RHB (R&HW)-Suapur GC Road Near Rajnagar Bazar Over Gazikhali River at Ch.10700m under Upazila: Dhamrai District: Dhaka Road ID No. 326142011
Package no: GDP-3/D-93
|
GDP-3
|
dhamrai
|
|
|
54.00
|
|
412.44
|
M/S Kofil Enterprise & M/S Islam Construction (JV)
|
391.36
|
|
|
|
70
|
|
|
28/06/2022
|
|
19
|
GDP-3/D-110
|
Improvement of Masdia (Minzar house) Bridge-Dhuljhuri-Mizan House (Masdai Bridge-Dhulijhuri Mezzanur Rahman) road by BC from Ch. 00-1950m (Road Id- 326144148) under union Chuhat upazila, Dist: Dhaka.
|
GDP-3
|
dhamrai
|
326144148
|
1.95
|
|
|
183.18
|
NHB Traders
|
160.21
|
13/09/2021
|
|
|
100
|
|
|
28/06/2022
|
|
20
|
GDP-3/D-55
|
2. Improvement of Dighol Gram Zohir (Uddin) House Eidgha Field via Syaed para Morarchar Connecting road at Ch. 00-1000m under Upazila Dhamrai District Dhaka. ID no326144112. (326144117).
|
GDP-3
|
dhamrai
|
326144112.(326144117)
|
1.00
|
|
|
79.52
|
M/S. S.S Enterprise
|
75.37
|
28/07/2019
|
|
|
100
|
|
|
19/06/2022
|
|
21
|
GDP-3/D-53
|
Improvement of Chapil-Dhamrai- Dhantara Road from Ch. 00-2500m Road ID No. 326144018 Salvage Cost 325468.00 under Upazila Dhamrai District Dhaka
|
GDP-3
|
dhamrai
|
326144018
|
2.50
|
|
|
215.89
|
M/S. Anika Enterprise
|
209.13
|
|
|
|
100
|
|
|
19/06/2022
|
|
22
|
GDP-3/D-88
|
a) Improvement of Digholgram Sobed Ali house to Digholgram Govt. Primary School Road at Ch. 00 -500m by BC under Upazila: Dhamrai, District: Dhaka Road ID No. 326144114(326144119)
b) Improvement of Sayeed para Govt. Primary School to Bocharbari Govt. Primary School via Morar char Road (Sahaid para to BMP Bazar) at Ch. 00 -1000m by BC under Upazila: Dhamrai, District: Dhaka Road ID No. 326144030
|
GDP-3
|
dhamrai
|
326144114(326144119),326144030
|
1.50
|
|
|
122.64
|
Tangid Traders
|
116.51
|
18/03/2020
|
|
|
100
|
|
|
19/06/2022
|
|
23
|
GDP-3/D-115
|
Improvement of Atimaithan graveyard to jobbar Master house road by BC from Ch.00-1000m under Union: Rowail Upazila: Dhamrai District: Dhaka. Road ID No. 326144156
|
GDP-3
|
dhamrai
|
326144156
|
1.00
|
|
|
80.66
|
Trade Vox International
|
76.62
|
|
|
|
0
|
|
|
19/06/2022
|
|
24
|
GDP-3/D-116
|
Improvement of Nayapara to Charpara Via Asrayan Prokalpo road by BC from Ch.00-1000m under Union: Sombhag Upazila: Dhamrai District: Dhaka. Road ID No. 326145094
|
GDP-3
|
dhamrai
|
326145094
|
1.00
|
|
|
82.09
|
M/S Majhrul Traders
|
77.99
|
17/02/2022
|
|
|
0
|
|
|
19/06/2022
|
|
25
|
GDP-3/D-117
|
Improvement of Amtola to Asrayan Prokalpo road by BC from Ch.380-880m under Union: Rowail Upazila: Dhamrai District: Dhaka. Road ID No. 326144156
|
GDP-3
|
dhamrai
|
326144156
|
0.50
|
|
|
40.24
|
M/S Rahman & Sons
|
38.23
|
17/02/2022
|
|
|
0
|
|
|
17/02/2022
|
|
26
|
GDP-3/D-14
|
Improvement of Shailan Foot Bridge-Kulinda Bridge via Kulinda Madrasha road Ch.00.00- 1000.00m. Road ID no 326144111 under Upazila Dhamrai, Dist Dhaka.
|
GDP-3
|
dhamrai
|
|
1.00
|
|
|
70.25
|
M/S. Khosheda Enterprise
|
66.74
|
|
03/06/2018
|
08/06/2019
|
100
|
|
|
06/10/2021
|
|
27
|
GDP-3/D-35
|
1.a) Improvement of Attulla Korban's house to Notun Kahela GPS Road at Ch.00-600m under Upazila Dhamrai District Dhaka Road ID No. 326144077. b) Improvement of Joga Market-Atullar Bazar Road at
|
GDP-3
|
dhamrai
|
|
1.60
|
|
|
132.11
|
R.S Trading Corporation, Address:Shop # 86 , 87, Misco Super Market, 4 No. Darus Salam Road , Mirpur, Dhaka-1216
|
125.50
|
|
|
|
65
|
|
|
06/10/2021
|
|
28
|
GDP-3/D-36
|
2.a) Improvement of Khararchar Bazar to Kangsha Kheya ghat via Pachu Fakir Bari Road at Ch.00-2000m by BC under Upazila Dhamrai District Dhaka Road ID No. 326144063. b) Improvement of Fakir Bar
|
GDP-3
|
dhamrai
|
|
3.50
|
|
|
252.16
|
Fast Builders
|
264.48
|
|
|
|
100
|
|
|
06/10/2021
|
|
29
|
GDP-3/D-39
|
5.a) Improvement of Kaimtara Atimatin (Atimaithan) Khararchar Bazar Road by BC at Ch.00-1750m under Upazila Dhamrai District Dhaka Road ID No. 326144012.
|
GDP-3
|
dhamrai
|
|
4.25
|
|
|
330.77
|
FASTBUILD
|
335.44
|
17/06/2019
|
|
|
100
|
|
|
06/10/2021
|
|
30
|
GDP-3/D-87
|
a a) Improvement of Shombag UP office to Bharaia UP Office Road at Ch. 6+200km -6+800km by Bituminous Carpeting under Union: Shombag/ Bhararia, Upazila: Dhamrai, District: Dhaka Road ID No. 326143014
b) Improvement of Digholgram Emarot (Uddin) house to Abdul Mannan Master house Road at Ch. 00 -500m by BC under Union: Bhararia, Upazila: Dhamrai, District: Dhaka Road ID No. 326144113(326144118)
|
GDP-3
|
dhamrai
|
|
1.10
|
|
|
98.61
|
Trade Vox International Address: House-41, Road-7, Block-C, Rampura Banasree, Dhaka
|
93.68
|
19/03/2020
|
|
24/12/2020
|
100
|
|
|
04/10/2021
|
|
31
|
GDP-3/D- 49
|
a) Improvement Shiti Bazar to Nowgaon Kait Bazar Road from Ch. 00-1000m Under Upazila Dhamrai, District: Dhaka. ID no:326144084 Salvage Amount Tk 3,04,328.00
b) Improvement Fakir Bari Mosque to Chairman Bari Road from Ch. 00-1200m Under Upazila Dhamrai, District: Dhaka. ID no:326154116 (326145116) Salvage Amount Tk 1,07,743.00
c) Improvement Kutirchar BC to Rouha Imamuddin house via Karim Kaimtara hat road by BC at Ch. 00-2000m Under Upazila Dhamrai, District: Dhaka. ID no:326144048
Package no: GDP-3/D- 49.
|
GDP-3
|
dhamrai
|
|
4.20
|
|
|
335.96
|
Fastbuild Address: House- 15 (2nd Floor), Road-12 (New), Dhanmondi, Dhaka-1209
|
335.90
|
|
|
|
70
|
|
|
04/02/2021
|
|
32
|
GDP-3/D-38
|
4. Improvement of Amta U.P. Office (Nayarchar bridge) to Basta Bazar Road at Ch.2300-5000m under Upazila Dhamrai District Dhaka Road ID No. 326143007.
|
GDP-3
|
dhamrai
|
|
2.70
|
75.00
|
|
211.39
|
Khorsheda and RM JV
|
206.45
|
|
|
|
100
|
|
|
09/08/2020
|
|
33
|
GDP-3/D-5
|
Improvement of Betuail four corner to Barapuika via Mr. Mahhabub & Sabus House road BC at Ch. 00-2150m under Upazila Dhamrai Dist: Dhaka. Road ID 326144124.
|
GDP-3
|
dhamrai
|
|
2.15
|
|
|
140.53
|
Nursat Trade internation
|
133.50
|
|
27/05/2018
|
01/06/2019
|
100
|
|
|
10/02/2020
|
|
34
|
GDP-3/D-4
|
Improvement of Dhamrai Fire Service Office to Kulla UP office road at Ch.00-500m under Upazila Dhamrai Dist: Dhaka. Road ID 326145111.
|
GDP-3
|
dhamrai
|
|
0.50
|
|
|
36.61
|
S.S Enterprise
|
34.78
|
|
16/05/2018
|
20/11/2018
|
100
|
|
|
09/10/2019
|
|
35
|
GDP-3/D-8
|
Improvement of RHD Dip Textile to Kaitamara GPS road at Ch. 450-2000m under Upazila Dhamrai Dist: Dhaka. Road ID 326145075.
|
GDP-3
|
dhamrai
|
|
1.55
|
|
|
115.66
|
M/S. Khosheda Enterprise
|
109.88
|
|
28/06/2018
|
05/06/2019
|
100
|
|
|
09/09/2019
|
|
36
|
GDP-3/D-24
|
A0 Improvement of Chowhat Kumarpara -Pikpara High school Road at (Ch.250-1000m) Under Upazila Dhamrai, Dist- Dhaka. Road ID No.326144090. B) Improvement of Bannal Mosqe-Paikpara Bazar via Sholabaria Road at (Ch.00-1500m) Under Upazila Dhamrai, Dist- Dha
|
GDP-3
|
dhamrai
|
|
2.25
|
|
|
163.92
|
M/S. Geneva International
|
155.72
|
|
13/11/2018
|
20/11/2019
|
100
|
|
|
08/07/2019
|
|
37
|
GDP-3/D-25
|
A) Improvement of Ghora Kanda - Gopalkrisnapur Road at (Ch.2080-4030m) Under Upazila Dhamrai, Dist- Dhaka. Road ID No.326145028. B) Improvement of Valum River Ghat to kalampur Dhantra Road. (Near the H/O Mohila Member) at (Ch.00-800m) Under Upazila Dhamr
|
GDP-3
|
dhamrai
|
|
3.35
|
|
|
239.11
|
M/S Geneva International
|
226.67
|
14/02/2019
|
|
|
100
|
|
|
08/07/2019
|
|
38
|
GDP-3/D-13
|
Improvement of Chowhat UP Office to Mokimpur Bazar Dimukha Bus Stand-Nodi Ghat Road at Ch. 4500-6500m Road ID no326143017 under Upazila, Dhamrai Dist Dhaka.
|
GDP-3
|
dhamrai
|
|
2.00
|
|
|
138.70
|
M/S. Zaman Enterprise
|
131.76
|
|
12/06/2018
|
11/06/2019
|
70
|
|
|
06/05/2019
|
|
39
|
GDP-3/D-6
|
Improvement of Gaowail NHW to Shombag U.P office road by BC at Ch. 00-2000m under Upazila Dhamrai Dist: Dhaka. Road ID 326143022.
|
GDP-3
|
dhamrai
|
|
2.00
|
|
|
145.58
|
Adib Engineering
|
138.27
|
|
14/05/2018
|
19/05/2019
|
100
|
|
|
03/04/2019
|
|
40
|
GDP-3/D-7
|
Improvement of Muktijodha Fazlur Rahman House to Sutipara Nannam road at Ch. 00-1300m under Upazila Dhamrai Dist: Dhaka. Road ID 326144075.
|
GDP-3
|
dhamrai
|
|
1.30
|
|
|
92.15
|
M/S. Atik Construction
|
87.54
|
|
27/05/2018
|
02/03/2019
|
100
|
|
|
03/04/2019
|
|
41
|
GDP-3/D-9
|
Rehabilitation of Joypura RHD Nannar GC via Jalsin bazar road Ch.00-1280m under Upazila Dhamrai Dist: Dhaka. Road ID 326142019.
|
GDP-3
|
dhamrai
|
|
1.28
|
|
|
88.07
|
M/S. Zaman Enterprise
|
83.67
|
|
23/05/2018
|
28/02/2019
|
100
|
|
|
07/03/2019
|
|
42
|
GDP-3/D-41
|
7.a) Improvement of Amta UP Office (Rafiq shop) to Saturia Upazila H/Q (Dhamrai Portion) Road by BC at Ch.00-2200m under Upazila Dhamrai District Dhaka Road ID No. 326143023.
|
GDP-3
|
dhamrai
|
|
2.20
|
|
|
177.18
|
|
0.00
|
|
|
|
0
|
|
|
|
|
43
|
Package no: GDP-3/D-85
|
Construction of 42.00m Long RCC Slab Bridge on Joypara RHW-Bilashpur UP Office Road at Ch.1400m under Union: Bilashpur Upazila: Dohar District: Dhaka Road ID No. 326183004
Package no: GDP-3/D-85
|
GDP-3
|
dohar
|
|
|
42.00
|
|
300.29
|
M/S Surma Enterprise;
|
274.63
|
|
|
|
85
|
|
|
28/06/2022
|
|
44
|
GDP-3/D-86
|
Construction of 50.00m Long RCC Girder Bridge on Joypara GC Majhichar Bazar-Kutubpur Debinagar-Kulchari-Kazirchar RHW Road at Ch.1130m under Union Bilashpur, Upazila: Dohar, District: Dhaka Road ID No. 326182008
Package no: GDP-3/D-86
|
GDP-3
|
dohar
|
|
|
50.00
|
|
377.85
|
Prince-Mamun JV, Address: College Road, Poura Kathali, Bhola
|
338.23
|
|
|
|
35
|
|
|
28/06/2022
|
|
45
|
GDP-3/D-50
|
a) Improvement of Muksudpur UP's Shinepukur- Borobari Graveyard- Shahi Mosque road (Shinepukur Graveyard- H/O Dr. A.R Khan -RHW near Padma College Road) at Ch. 560-690m & 1080-1150m under Upazila: Dohar, District Dhaka Road ID No. 326184075
b) Improvement of Muksudpur UP's Padma College Chatra Bash- (Shahid Mahfuj Hostel Academica) Shantinagar connecting Road (Muksudpur Khoria Padma College Chtra Bash-Shantinagar Modhur Khola Bipass road) at Ch.00-336m under Upazila: Dohar, District Dhaka Road ID No. 326184061
|
GDP-3
|
dohar
|
326184075,326184061
|
0.54
|
|
|
68.65
|
Dia Construction
|
65.22
|
16/12/2019
|
|
|
100
|
|
|
19/06/2022
|
|
46
|
GDP-3/D-118
|
Construction of 22.00m Long RCC Girder Bridge on Joypara GC Majhichar Bazar-Kutubpur Debinagar-Kulchari-Kazirchar RHW Road at Ch.2150m under Upazila Dohar District Dhaka Road ID No. 326182008
|
GDP-3
|
dohar
|
326182008
|
|
22.00
|
|
202.12
|
M/S Jakaullah & Brothers
|
197.82
|
03/01/2022
|
|
|
0
|
|
|
19/06/2022
|
|
47
|
GDP-3/D-138
|
Construction of 20.00m Long RCC Girder Bridge on Joypara GC -Darogabari-palamganj RHW Road at Ch.1650m under Upazila Dohar District Dhaka Road ID No. 326182007
|
GDP-3
|
dohar
|
326182007
|
|
20.00
|
|
222.68
|
Nirapad International
|
195.07
|
03/01/2022
|
|
|
0
|
|
|
19/06/2022
|
|
48
|
GDP-3/D-142
|
Improvement of Raipara UP Office-Bow Bazar Road By BC from Ch. 00-510m Road under Upazila Dohar District Dhaka. Road ID no. 326183008
|
GDP-3
|
dohar
|
326183008
|
0.50
|
|
|
53.62
|
Gazi Enterprise
|
50.94
|
17/04/2022
|
|
|
0
|
|
|
19/06/2022
|
|
49
|
GDP-3/D-143
|
Improvement of Raipara UP Office-Jamal Char-Kartikpur Bazar Road By BC from Ch. 00-1300m Road under Upazila Dohar District Dhaka. Road ID no. 326183009
|
GDP-3
|
dohar
|
326183009
|
1.30
|
|
|
113.67
|
Eriq Tech
|
107.98
|
|
|
|
0
|
|
|
19/06/2022
|
|
50
|
GDP-3/D-144
|
Improvement of Raipara 3 No Khal Para Dewan bari Math-Dewan bari Graveyard-Janu Member bari Road By BC from Ch. 00-700m Road under Upazila Dohar District Dhaka. Road ID no. 326185074
|
GDP-3
|
dohar
|
326185074
|
0.70
|
|
|
66.63
|
JM Construction
|
0.00
|
|
|
|
0
|
|
|
19/06/2022
|
|
51
|
Package no: GDP-3/D- 47
|
a) Improvement of Meghula pry. School RHW-Dakshin Shimulia Pry. School-Dhitpur Padma bypass road from Ch. 3087-4480m Under Upazila Dohar, District: Dhaka. ID no:326184060 Salvage Amount Tk 67,415.00 b) Improvement of Char Kushai-Bhuya Bari Road (Char Kushai Main Road-Char Kushai Parimary School) from Ch. 00-695m Under Upazila Dohar, District: Dhaka. ID no:326185007 Salvage Amount Tk 97,837.00
c) Improvement of Uttar Moura Buchir Bill-H/O Kalu Dewan- Hurarbill- H/O Imran Road from Ch. 00-1000m Under Upazila Dohar, District: Dhaka. ID no:326184084 Salvage Amount Tk 6,28,431.00
d) Improvement of Charkushai H/O Nur Mohammad (Amina Doctor House)- Dewbhog Pry. School- H/O Alal (H/O Khalak- H/O Karim Bepary- H/O Munsur from Ch. 850-1455m Under Upazila Dohar, District: Dhaka. ID no:326184187
Package no: GDP-3/D- 47.
|
GDP-3
|
dohar
|
|
3.69
|
|
|
296.67
|
Asian Traffic Technologies Limited.
|
292.17
|
|
|
|
100
|
|
|
04/10/2020
|
|
52
|
GDP3/D-21
|
Improvement of Parankhali shop of Shorhab - H/O Manik Fakir H/O-Modhu Khan Bari Parankhali Bridge Rasta Pannur Bari Road Ch. 00-750m Road under Upazila Dohar District Dhaka. Road ID no. 326184127 B. Improvement of Doair Bari- Sirajul Islam Bhulu-MopielMof
|
GDP-3
|
dohar
|
|
2.65
|
|
|
203.88
|
Asian Traffic Technologies Ltd.
|
189.69
|
|
20/11/2019
|
25/11/2019
|
100
|
|
|
02/06/2020
|
|
53
|
GDP-3/D-Reh-1
|
Rehabilitation of Joypara-Yousufpur Arial Bil road Ch.00-1960m Road ID 326184022 under Dohar Upazila District: Dhaka.
|
GDP-3
|
dohar
|
|
1.96
|
|
|
64.62
|
M/S. Diba Enterprise
|
61.38
|
|
23/05/2018
|
27/11/2018
|
100
|
|
|
08/07/2019
|
|
54
|
Package no: GDP-3/D-75
|
Construction of 60.00m Long RCC Girder Bridge on Natunchar Kharakandi Ghat-Hoglagati Road at Ch.200m under Union: Kalatia, Upazila: Keraniganj, District: Dhaka Road ID No. 326384057
Package no: GDP-3/D-75
|
GDP-3
|
keraniganj
|
|
|
60.00
|
|
357.95
|
Prince-Mamun JV, Address: College Road, Poura Kathali, Bhola
|
320.26
|
|
|
|
35
|
|
|
28/06/2022
|
|
55
|
GDP-3/D-76
|
Construction of 75.0m Long PSC Girder Bridge on Subarnasur Graveyard-Char Ruhitpur Road at Ch.950m Under Union: Kalatia Upazila: Keraniganj, District: Dhaka. Road ID No. 326385356
Package no: GDP-3/D-76
|
GDP-3
|
keraniganj
|
|
|
75.00
|
|
495.92
|
ASCL & RCCL JV
|
520.00
|
|
|
|
80
|
|
|
28/06/2022
|
|
56
|
GDP-3/D-97
|
Construction of 39.00m Long RCC Girder Bridge on Near Goista Bazar Over Baghoir Khal Road at Ch.3170m under Union: Teghuria, Upazila: Keraniganj, District: Dhaka Road ID No. 326385487 (326384052)
Package no: GDP-3/D-97
|
GDP-3
|
keraniganj
|
|
|
39.00
|
|
273.42
|
TN-ASI(JV),
|
228.43
|
|
|
|
80
|
|
|
28/06/2022
|
|
57
|
GDP-3/D-45
|
a) Improvement of BastatiP Dakkin Rajabari mainroad via Dakkin Malivita to Abdullahpur road by BCfrom Ch. 0000km-1000km under Upazila Keraniganj District Dhaka. Road ID No326385311
b) Improvement of Ruhithpur UP Lakerchar main road to Mugarchar main road via H/O. Amir Ali Master house road by BC from Ch. 0000km-1000km under Upazila Keraniganj District Dhaka. Road ID No326385331
c) Improvement of Kalatia UP Noyagao School to Uhl Rosen Janga Bari Noyagao School- Khaskandi Rishibari road by BC from Ch. 0000km-0750km under Upazila Keranigarij District Dhaka Road ID No326385354.
|
GDP-3
|
keraniganj
|
326385311,326385331,326385354
|
2.75
|
|
|
226.63
|
M/S Belal & Brothers
|
218.13
|
08/09/2019
|
|
|
70
|
|
|
28/06/2022
|
|
58
|
GDP-3/D-109
|
Improvement of Dhaka-Mawa Main road (Char Kunduila H/Q.Mostofa) to Sonakanda GPS road by BC from Ch. 00-2000.00m Dist: Dhaka
|
GDP-3
|
keraniganj
|
|
2.00
|
|
|
223.22
|
Voice Communication
|
195.80
|
30/12/2021
|
|
|
30
|
|
|
28/06/2022
|
|
59
|
GDP-3/D-44
|
a) Improvement of Taranagor UP Beuta bridge mor to Sirajnagar Main road from Ch. 00-1140m under Upazila Keraniganj District Dhaka. Road ID No326385419
b) Improvement Taranagar UP Joynagar Emergaon to Ghatar Char Market road from Ch. 00-790m under Upazila Keraniganj District Dhaka. Road ID No326385087
c) Improvement of Taranagar UP Uttar Baher char Main road to Bridge road from Ch. 00-620m under Upazila Keranigarij District Dhaka Road ID No326385360
d) Improvement of Hazratpur UP Baluchar-Bounakandi road via Rasulpur by BC Road from Ch. 0000km-1000km under Upazila KeraniganjDistrict Dhaka. Road ID No326384004 salvage amount Tk. 477774.00
e) Improvement of Kalindi UP Vagna choto Bridge to vagna GPS via Mojib nagar Road by BC Road at Ch. 0000km-0525km under Upazila Keraniganj District Dhaka. Road ID No326385303
f) Improvement of Basta UP Keraniganj T&T Office via Olatia to Goalkhali Gohaikhali Bazar by BC Road from Ch. 0000km-0460km under Basta UP Upazila Keraniganj District Dhaka. ID no326385061 .
|
GDP-3
|
keraniganj
|
326385419,326385087,326385360,326384004,326385303,326385061
|
4.53
|
|
|
361.36
|
Jakaullah & Broders
|
361.26
|
10/07/2019
|
|
|
100
|
|
|
20/06/2022
|
|
60
|
GDP-3/D-46
|
a) Improvement of Kalatiya UP Kathal Bagan mainroad to Kharakandi bazar road by BC from Ch.0000km-0775km under Upazila Keraniganj District Dhaka. Road ID No326385349 salvage amount Tk. 74140.00.
b) Improvement of Kalatiya UP Char Aksait Kheyaghat to H/o Aziz road by BC from Ch. 0000km-0750km under Upazila Keraniganj District Dhaka. Road ID No326385348
c) Improvement of Kalatia UP Kharakandi main road to Graveyeard road Natun Char Kharakandi Kashi Fokirer Mazar to via hati by BC from Ch. 0000km-1000km under Upazila Keranigarij District Dhaka Road ID No326385353
d Improvement of Bosila bridge Approach road to Motalib Company road from Ch.00-750m by BC under Upazila Keranigarij District Dhaka Road ID No326385459.
|
GDP-3
|
keraniganj
|
326385349,326385348,326385353,326385459
|
3.28
|
|
|
266.01
|
S.M Constraction
|
251.67
|
13/08/2019
|
|
|
100
|
|
|
20/06/2022
|
|
61
|
GDP-3/D-80
|
Improvement of Taranagar Bara Monaharia Belaboot Road Chota Vaowal Chota Monoharia Road at Ch.00-700m under Taranagor Union Upazila Keraniganj District Dhaka Road ID No. 326385205 366385455. T.ID: 376666
|
GDP-3
|
keraniganj
|
326385205,366385455
|
0.70
|
|
|
78.57
|
K.M.R.M Enterprise
|
74.64
|
03/02/2020
|
|
|
100
|
|
|
20/06/2022
|
|
62
|
GDP-3/D-99
|
Improvement of Baghaspur Main Road to Shapur main road via Madrasha Baghapur High School Road by BC at Ch 00-987m. under Upazila Keraniganj District Dhaka Road ID No. 326385312. Salvage amount Tk.1214428.00
|
GDP-3
|
keraniganj
|
326385312
|
0.99
|
|
|
88.39
|
R.S Trading Corporation
|
82.92
|
12/04/2020
|
|
|
100
|
|
|
20/06/2022
|
|
63
|
GDP-3/D-119
|
Improvement of Ruhitpur Bazar-Motaleb house road by RCC from Ch.00-300m under Union: Ruhitpur Upazila: Keraniganj District: Dhaka Road ID No. 326385464
|
GDP-3
|
keraniganj
|
326385464
|
0.30
|
|
|
73.78
|
Kamal Enterprise
|
70.09
|
03/02/2022
|
|
20/12/2022
|
0
|
|
|
20/06/2022
|
|
64
|
GDP-3/D-120
|
Improvement of Baghasur Main road to Sahpur main road via Madrasha Baghasur High School Road by BC from Ch.1000.00-1200.000m under Union: Ruhitpur Upazila: Keraniganj District: Dhaka Road ID No.326385312
|
GDP-3
|
keraniganj
|
326385312
|
0.20
|
|
|
18.78
|
M/S Berdo
|
17.84
|
06/02/2022
|
|
|
100
|
|
|
20/06/2022
|
|
65
|
GDP-3/D-121
|
Improvement of Mekail Main Road to Mondir road by BC from Ch.00.00-650.000m Sakta UP under Union: Sakta Upazila: Keranizanj District: Dhaka Road ID No. 326385462
|
GDP-3
|
keraniganj
|
326385462
|
0.65
|
|
|
52.12
|
Arefin Enterprise
|
49.51
|
03/02/2022
|
|
|
0
|
|
|
20/06/2022
|
|
66
|
GDP-3/D-122
|
Improvement of Nekrozbag R&H to Borhanibag Bridge road by RCC from Ch.500.00-2000.00m Kalindi UP under Union: Kalindi Upazila: Keraniganj District: Dhaka Road ID No. 326384154
|
GDP-3
|
keraniganj
|
326384154
|
1.50
|
|
|
269.88
|
M/S Lorin Enterprise
|
242.89
|
01/03/2022
|
|
|
0
|
|
|
20/06/2022
|
|
67
|
GDP-3/D-123
|
Improvement of Sonakanda Paina Ati to Sonakanada Math via H/O Sulimullah Chairman Road by RCC from Ch.00.00-1255.000m Ruhitpur UP under Union: Ruhitpur Upazila: Keraniganj District: Dhaka Road ID No. 326385329 .
|
GDP-3
|
keraniganj
|
326385329
|
1.25
|
|
|
220.16
|
M/S Lorin Enterprise
|
198.15
|
01/03/2022
|
|
|
0
|
|
|
20/06/2022
|
|
68
|
GDP-3/D-133
|
Improvement of Road from Alukanda to Bakterchar College Road by RCC from Ch.00-700m under Union: Konda Upazila: Keraniganj District: Dhaka Road ID No. 26385178 .
|
GDP-3
|
keraniganj
|
26385178
|
0.70
|
|
|
119.83
|
Manha Traders
|
113.84
|
23/02/2022
|
|
|
100
|
|
|
20/06/2022
|
|
69
|
GDP-3/D-139
|
Improvement of Mollapara Mondir To Zulhas Member to R&H Road by RCC from Ch.00-360m under Union: Kalindi Upazila: Keraniganj District: Dhaka Road ID No. 326385310 .
|
GDP-3
|
keraniganj
|
326385310
|
0.36
|
|
|
65.16
|
Shourov Enterprise
|
61.90
|
22/03/2022
|
|
|
0
|
|
|
20/06/2022
|
|
70
|
GDP-3/D-140
|
Improvement of Shuvadda UP Begunbari Road by RCC from Ch.00-683m under Union: Shuvaddai Upazila: Keraniganj District: Dhaka Road ID No. 326385121.
|
GDP-3
|
keraniganj
|
326385121
|
0.68
|
|
|
143.86
|
A J Trade International
|
136.67
|
11/03/2022
|
|
|
0
|
|
|
20/06/2022
|
|
71
|
GDP-3/D-141
|
Improvement of Taranagar UP Nimtoly to Guita Bridge via Kashari vawal Road by RCC from Ch.00-1000m under Union: Taranagar Upazila: Keraniganj District: Dhaka Road ID No. 326385361.
|
GDP-3
|
keraniganj
|
326385361
|
1.00
|
|
|
202.12
|
M/S Kazi Traders
|
159.65
|
10/05/2022
|
|
|
0
|
|
|
20/06/2022
|
|
72
|
GDP-3/D-100
|
Improvement of Suvaddha UP Golam Bazar-Suvaddha School road by RCC at Ch. 00-504m. under Upazila: Union: Suvaddha, Keraniganj District: Dhaka Road ID No. 326385147
Package no: GDP-3/D-100
|
GDP-3
|
keraniganj
|
|
0.50
|
|
|
108.75
|
H M Enterprise
|
103.31
|
|
|
|
100
|
|
|
06/10/2021
|
|
73
|
GDP-3/D-Market-83
|
Rehabilitation of Kalatia GC under Union: Kalatia, Upazila: Keraniganj, District: Dhaka
Package no: GDP-3/D-Market-83
|
GDP-3
|
keraniganj
|
|
|
|
|
15.00
|
J N ENTERPRISE
|
14.25
|
|
|
|
100
|
|
|
06/10/2021
|
|
74
|
GDP-3/D-104
|
Improvement of Zinzira PM Pilot School & College to Nado Bapari Ghat Road by RCC at Ch. 00-300m. under Union: Zinzira Upazila: Keraniganj District: Dhaka Road ID No. 326385484 (326385483)
Package no: GDP-3/D-104
|
GDP-3
|
keraniganj
|
|
0.30
|
|
|
63.13
|
M/S. Kazi Traders
|
59.98
|
|
|
|
100
|
|
|
06/10/2021
|
|
75
|
GDP-3/D-98
|
Improvement of Notun Char Kharakandi Ghat-Hoglagathi Ghat (Notun Char Kharakandi Latif Madhbor house-Rongu Hazi house via Madbor Bari Mosque Road) by BC at Ch. 00-950m. under Upazila: Keraniganj District: Dhaka Road ID No. 326384057 Salvage Cost. 1,64,484.00
Package no: GDP-3/D-98
|
GDP-3
|
keraniganj
|
|
0.95
|
|
|
79.05
|
M/S BROTHERS AND SONS,
|
75.10
|
|
|
|
100
|
|
|
06/12/2020
|
|
76
|
GDP-3/D-Market-84
|
Rehabilitation of Bibir Bazar GC under Union: Konda, Upazila: Keraniganj, District: Dhaka
Package no: GDP-3/D-Market-84
|
GDP-3
|
keraniganj
|
|
|
|
|
17.68
|
M/S. Boishakhi Enterprise, Address: B#25, Mannan Plaza (2nd floor), Khilkhet Bazar, Shop-22, Dhaka-1229
|
16.80
|
10/02/2020
|
|
15/11/2020
|
100
|
|
|
06/12/2020
|
|
77
|
Package no: GDP-3/D-Market-83
|
Rehabilitation of Kalatia GC under Union: Kalatia, Upazila: Keraniganj, District: Dhaka
Package no: GDP-3/D-Market-83
|
GDP-3
|
keraniganj
|
|
|
|
|
15.00
|
J N ENTERPRISE, Address: # 35/F/3/1, Road # 2, Shaymoli, Dhaka-1207.
|
14.25
|
01/02/2020
|
|
15/11/2020
|
100
|
|
|
07/09/2020
|
|
78
|
GDP-3/D-57
|
a) Improvement of Zinzira UP’s Zinzira- Sayedpur (RHD) Parzoar GPS to Nojorganj road by RCC from Ch. 00-460m under Union: Zinzira, Upazila: Keraniganj, District: Dhaka Road ID No. 326385052
b) Improvement of Mirrerbag Madrasha to Orient Textile High School Road by RCC from Ch. 00-96m under Union: Suvaddya, Upazila: Keraniganj, District: Dhaka Road ID No. 326385144
Package no: GDP-3/D- 57.
|
GDP-3
|
keraniganj
|
|
0.56
|
|
|
143.01
|
M/S Ethika Enterprise, Address: Golam Bazar, South Keraniganj, Dhaka.
|
123.70
|
|
|
|
100
|
|
|
02/03/2020
|
|
79
|
GDP-3/D-18
|
a Improvement of Ruhitpur UP Mughrchair Churasta to Kaligong road by BC at Ch. 00-1000m under Ruhitpur UP Upazila Karaniganj Dist Dhaka. Road ID no 326385330. b Improvement of Ruhitpur Abdul Jalil Chairman Bari to H/0 Muntu Gopal Road by BC at Chaingae 00
|
GDP-3
|
keraniganj
|
|
3.46
|
|
|
255.59
|
Jakaullah & Brothers
|
228.50
|
11/11/2018
|
|
|
100
|
|
|
01/01/2020
|
|
80
|
GDP-3/D-31
|
Improvement of Shakta Up Road from Bosila bridge approach road to Bhangabari Bridge at Ch.0 to 500m. under Sakta UP Upazila Keranigonj District Dhaka. ID no326385276.
|
GDP-3
|
keraniganj
|
|
0.50
|
|
|
43.64
|
|
0.00
|
|
|
|
100
|
|
|
06/05/2019
|
|
81
|
GDP-3/D-22.
|
Improvement of Road from Sholla UP Office- Dattakhonda- Balukhonda Bazar via Chukuria Sholla UP Office- Dattakhanda- via Patilja Bazar Ch. 1750-3750m road under Upazila Nawabganj District Dhaka. Road ID no. 326623013 B. Improvement of Road from Nawabganj
|
GDP-3
|
nawabganj
|
|
3.00
|
|
|
221.71
|
Asian Traffic Technologies Ltd.
|
205.71
|
|
20/11/2018
|
25/11/2019
|
100
|
|
|
28/06/2022
|
|
82
|
Package no: GDP-3/D-58
|
Improvement of Baruakhali Union Brammonkhali – Bairchar Mosque Road (Brammonkhali to Baher Char Mosque via Bahercahr GPS Road) at Ch. 00-2000m under Upazila: Nawabganj District: Dhaka Road ID No. 326624164 (326624215)
Salvage amount Tk.13,23,307.000
Package no: GDP-3/D-58
|
GDP-3
|
nawabganj
|
|
2.00
|
|
|
136.72
|
Asian Traffic Technologies Limited., Address: House- 67, Road-27, Suit-5/A, Gulshan Circle-1, Dhaka.
|
132.85
|
|
|
|
70
|
|
|
28/06/2022
|
|
83
|
Package no: GDP-3/D-79
|
Improvement of Koilial UP Office –Agla Bazar (Koilil Union -Koilil Madrasha- Koilil Lonchghat) Road at Ch.1000-2500m under Union: Koilal, Upazila:Nawabganj District: Dhaka Road ID No. 326623015
Package no: GDP-3/D- 79
|
GDP-3
|
nawabganj
|
|
1.50
|
|
|
135.11
|
Mayer Doya Construction, Address:Lotakhola, Palamganj, Dohar, Dhaka-1330.
|
128.36
|
05/02/2020
|
|
10/11/2021
|
100
|
|
|
28/06/2022
|
|
84
|
Package no: GDP-3/D-90
|
Improvement of Jinjira Dohar R&H-Komargonj Rishipara Road at Ch. 00-1000m under Union: Boxnagar Upazila: Nawabganj District: Dhaka Road ID No. 326624080
Salvage Cost. 4,32,386.00
Package no: GDP-3/D-90
|
GDP-3
|
nawabganj
|
326624080
|
1.00
|
|
|
68.55
|
Shadab Construction, Address:46/2/KO, Zigatola, Dhanmondi, Dhaka.
|
65.12
|
07/06/2020
|
|
05/08/2021
|
100
|
|
|
28/06/2022
|
|
85
|
Package no: GDP-3/D-91
|
Improvement of Nawabganj Upazila HQ- Dohar Upazila HQ via Rajpara, Saheb Bazar road from Ch. 3200-5400m under Upazila: Nawabganj District: Dhaka Road ID No. 326622017
Package no: GDP-3/D-91
|
GDP-3
|
nawabganj
|
326622017
|
2.20
|
|
|
172.25
|
M/S. Salim Enterprise, Address: Joypara, Dohar Dhaka.
|
160.71
|
07/06/2020
|
|
20/04/2021
|
100
|
|
|
28/06/2022
|
|
86
|
Package no: GDP-3/D-51
|
Improvement of Barrah-Kandamatra- Endrakhaly to Vawalia Graveyard to UZR Road at Ch. 00 -2000m under Unioun Barrah, Upazila: Nawabganj District: Dhaka Road ID No. 326143029
Salvage amount Tk. 4,17,056.00
Package no: GDP-3/D-51
|
GDP-3
|
nawabganj
|
|
2.00
|
|
|
160.37
|
Faruk-Diba-JV; Address: Barrah, Nawabganj, Dhaka
|
159.94
|
|
|
|
100
|
|
|
28/06/2022
|
|
87
|
GDP-3/D-73
|
Improvement of Vangavita Ferryghat to Nawabganj Paragram hat via Masail Rich (Rishipara via Dignara) by BC Road at Ch. 1000-3000m under Under Union: Koilail Upazila: Nawabganj District: Dhaka Road ID No. 326624075
Salvage amount Tk. 11,98,916.00
Package no: GDP-3/D-73
|
GDP-3
|
nawabganj
|
|
2.00
|
|
|
153.26
|
R.S Trading Corporation
|
151.96
|
|
|
|
100
|
|
|
28/06/2022
|
|
88
|
GDP-3/D-102
|
Improvement of road from Baruakhali High School to Panilkower Embankment via Nabogram Kalimondir Baruakhali Nabogram road via Painkower Road at Ch. 1100- 2300m.under Baruakhali union Upazila Nawabganj District Dhaka. Road ID 326624111 Package No. GDP-3/D-102
|
GDP-3
|
nawabganj
|
326624111
|
1.20
|
|
|
97.29
|
Chisty Trading Enterprise
|
92.43
|
13/07/2020
|
|
|
35
|
|
|
28/06/2022
|
|
89
|
GDP-3/D-113
|
Improvement of Jontrail UP Office (Horiskul Bazar)- Chondrokhola Bazar via Chondrokhola Kali Mondir Bazar Road (Horiskul Chondrokhola - Kaii Mondir Road) (Jontrail UP-Chondrokhola Bazar Road) by BC from Ch.2000-4000m under Union: Jontrail, Upazila: Nawabganj District: Dhaka. Road ID No. 326623036
|
GDP-3
|
nawabganj
|
326623036
|
2.00
|
|
|
167.49
|
M/S S. Alam Construction
|
159.12
|
19/01/2022
|
|
|
25
|
|
|
28/06/2022
|
|
90
|
GDP-3/D-114
|
Improvement of Churain Graveyard to Play Ground Road by BC from Ch.00- 1080m under Union: Churain Upazila: Nawabganj District: Dhaka. Road ID No. 326624284 Salvage amount Tk. 4,13,209.00 .
|
GDP-3
|
nawabganj
|
326624284
|
1.08
|
|
|
72.79
|
M/S Nabil International.
|
69.15
|
25/01/2022
|
|
|
30
|
|
|
28/06/2022
|
|
91
|
GDP-3/D-78
|
a Improvement of Baruakhali Bheramuria Borhan Mollah House to Darikandi Jalal House Road at Ch. 00-775m under Baruakhali Union Upazila Nawabganj District Dhaka Road ID No. 326625217, 326624213
b Improvement of Baruakhali House of Sultan Khan Bhangapara Bridge Road at Ch. 00-670m. under Baruakhali Union Upazila Nawabganj District Dhaka Road ID No. 326625212 326624219 Salvage Cost 200977.00.
|
GDP-3
|
nawabganj
|
326624213,326625212,326624219
|
1.45
|
|
|
106.03
|
Dewan Construction
|
100.73
|
09/02/2020
|
|
|
100
|
|
|
20/06/2022
|
|
92
|
GDP-3/D-101
|
Improvement of road from Solla UP Atkahania Gucchogram-Graveyard Road at Ch. 00-600m under Solla union Upazila Nawabganj District Dhaka. Road ID 326625221 326624288 Package No. GDP-3/D-101
|
GDP-3
|
nawabganj
|
326625221,326624288
|
0.60
|
|
|
39.12
|
A J Trade International
|
20.12
|
13/07/2020
|
|
|
65
|
|
|
20/06/2022
|
|
93
|
GDP-3/D-124
|
Construction of 30.0m Long Slab with PSC Girder Bridge on Kandabrilla GPS Alalpur Vuterghat vai Osman Memorial Hospital Road at Ch.1000m under Union: Barwakhali Upazila: Nawabganj District: Dhaka Road ID No. 326624220
|
GDP-3
|
nawabganj
|
326624220
|
|
30.00
|
|
163.91
|
Tanvir Construction International.
|
155.71
|
23/01/2022
|
|
|
20
|
|
|
20/06/2022
|
|
94
|
GDP-3/D-77
|
Improvement of Baruyakhali Dirghogram Adam Ali House to Mohamod Ali House Road at Ch.00-1000m. under Baruakhali Union Upazila Nawabganj District Dhaka Road ID No. 326625218,326624218
|
GDP-3
|
nawabganj
|
326625218,326624218
|
1.00
|
|
|
65.04
|
Shadab Construction
|
61.79
|
02/11/2020
|
|
|
100
|
|
|
19/06/2022
|
|
95
|
GDP-3/D-56
|
a) Improvement of Kolakopa RHD (amtala) to Poddar Bazar (Kolakopa UP Amtola to Poddar Bazar Road) (Harvanga RHD at (Amtola) – Poddar Bazar near Shoeb house Road) at Ch. 00-800m under Upazila: Nawabganj District: Dhaka Road ID No. 326625193
Salvage amount Tk. 15,21,946.00
b) Improvement of KalaKopa UP Samshabad Kaowmi Madrasha to Sub-Station (Thana road –Purba Shamsabad house of Ali Member Road at Ch. 00-1500m under Upazila: Nawabganj District: Dhaka Road ID No. 326624121
Package no: GDP-3/D-56
|
GDP-3
|
nawabganj
|
|
2.23
|
|
|
152.35
|
M/s Farok & Brothers,
|
141.16
|
|
|
|
80
|
|
|
09/11/2021
|
|
96
|
GDP-3/D-42.
|
8.Improvement of Kartikpur-(Dohar). Awaliabad-Kacharighat-Bandura Bazar-Majhirkanda (R&H) Road at (Ch.3750-5750m) under Upazila Nawabganj Dist Dhaka. Road ID no 326622008. b. Improvement of Noapara village to (Noa Mailal road) (Naopara village road) at C
|
GDP-3
|
nawabganj
|
|
4.50
|
|
|
331.76
|
Kofil and Joyti Enterprise JV
|
319.95
|
|
|
|
100
|
|
|
06/10/2021
|
|
97
|
Package no: GDP-3/D-60
|
Improvement of Komorgonj G.C- Paragram GC via Koilail U.P Road at Ch. 4250-7425m under Union: Koilail, Upazila: Nawabganj District: Dhaka Road ID No. 326622015
Salvage amount Tk. 4,86,141.00
Package no: GDP-3/D-60
|
GDP-3
|
nawabganj
|
|
3.18
|
|
|
296.04
|
Asian Traffic Technologies Limited., Address: House-67, Road -27, Suit-5/A, Gulshan Circle-1, Dhaka
|
290.03
|
|
|
|
100
|
|
|
06/10/2021
|
|
98
|
Package no: GDP-3/D-61
|
Improvement of Komorgonj G.C- Paragram G.C via Koilail U.P Road at Ch. 7425-10600m under Union: Brraha Upazila: Nawabganj District: Dhaka Road ID No. 326622015
Salvage amount Tk. 6,92,822.00
Package no: GDP-3/D-61
|
GDP-3
|
nawabganj
|
|
3.18
|
|
|
287.05
|
Surma-Isamoti JV, Address: Thikana Apartment, House # 6 Flat#A-2, Green Corner, Green Road, Dhaka-1205
|
273.61
|
|
|
|
100
|
|
|
06/10/2021
|
|
99
|
Package no: GDP-3/D-59
|
a) Improvement of Kumarbarilla Govt. Pramary School to Karpara Bridge road at Ch. 00-580m under Upazila: Nawabganj District: Dhaka Road ID No. 326624181 (326624221)
Salvage amount Tk. 3,35,637.00
b Improvement of Kandabarilla GPS to Alalpur Bhuterghat -Usman memorial Hospital road at Ch. 00-1600m under Upazila: Nawabganj District: Dhaka Road ID No. 326624182 (326624220)
Salvage amount Tk. 10,24,464.00
Package no: GDP-3/D-59
|
GDP-3
|
nawabganj
|
|
2.18
|
|
|
138.45
|
Asian Traffic Technologies Limited., Address: House- 67, Road-27, Suit-5/A, Gulshan Circle-1, Dhaka.
|
134.46
|
|
|
|
100
|
|
|
06/10/2021
|
|
100
|
Package no: GDP-3/D-92
|
Improvement of Jantral (Nantrail) Gachirvita Nolkura (Nolgura) – Sukchan (Tea) Shop road at Ch. 00-2000m under Union: Jontrail Upazila: Nawabganj District: Dhaka Road ID No. 326624168
Salvage Cost. 15,63,096.00
Package no: GDP-3/D-92
|
GDP-3
|
nawabganj
|
326624168
|
2.00
|
|
|
126.82
|
Life Enterprise, Address: Gazir Tek, Dohar, Dhaka-1330
|
120.48
|
11/03/2020
|
|
16/12/2020
|
100
|
|
|
06/10/2021
|
|
101
|
GDP-3/D- 74
|
Improvement of Dr. Sirajul Islam – Algichar Graveyard via Miah Bari Mosque to Late Abdul Wadud House road by BC Road at Ch. 00-1000m under Union: Braha, Upazila: Nawabganj District: Dhaka Road ID No. 326624166 (326624277)
Salvage Cost. 3,54,622.00
Package no: GDP-3/D- 74
|
GDP-3
|
nawabganj
|
|
1.00
|
71.57
|
|
67.99
|
M/S MAZ BUSINESS SYNDICATE,
|
0.00
|
|
|
|
100
|
|
|
06/10/2021
|
|
102
|
GDP-3/D-26.
|
Improvement of Nawabgonj Paragam UZR-Mashail-Modhopur P/S via Durika Road at (Ch.00-970m) under Upazila Karaniganj Dist Dhaka. Road ID no 326624031
|
GDP-3
|
nawabganj
|
|
0.97
|
|
|
65.47
|
M/S. Isamoti Traders
|
62.20
|
|
20/11/2018
|
26/07/2019
|
100
|
|
|
04/02/2021
|
|
103
|
GDP-3/D-43.
|
9.a) Improvement of Nawabgonj-Paragram (Hat) UZR-Sonapur Sholla-Aowna (Unr Connected Road) UP Road at (Ch.900-2000m) under Upazila Nawabganj Dist Dhaka. Road ID no 326624152.
|
GDP-3
|
nawabganj
|
|
3.10
|
|
|
226.85
|
Khorsheda and RM JV
|
226.45
|
|
|
|
100
|
|
|
04/02/2021
|
|
104
|
GDP-3/D-54
|
Improvement Shankarkhali-Shantirbazar-Meghula (Sonahazra Tafiz member house – Shankarkhali Mizan house) Road at Ch. 00 -1000m under Upazila: Nawabganj District: Dhaka Road ID No. 326624126
Package no: GDP-3/D- 54
|
GDP-3
|
nawabganj
|
|
1.00
|
|
|
82.53
|
M/S. Bonna Enterprise, Prop: Mr. Moksed, Address: Botia Joypara, Dohar, Dhaka
|
78.40
|
|
|
|
100
|
|
|
04/02/2021
|
|
105
|
GDP-3/D-11.
|
Improvement of road from Kumarbarilla Gravyard to Ichamoti river ghat at ch.00-745m.Id no:326624180 under Upazila Nawabganj Dist Dhaka. T.ID: 207394
|
GDP-3
|
nawabganj
|
|
0.75
|
|
|
50.14
|
M/S. Nizam Uddin Enterprise.
|
47.63
|
|
25/09/2018
|
30/09/2019
|
100
|
|
|
03/09/2020
|
|
106
|
GDP-3/D-15.
|
a. Improvement of Sirajpur Hat to Matabpur Ferry Ghat Road from Ch. 00-2000m under Upazila Nawabganj Dist Dhaka. ID no 326624032. b. Improvement of Pragram Graveyard-Ferryghat Road Ch. 00-2300. N.gonj P.hat UZR at Pragram Graveyard-Malikanda via Modhupur
|
GDP-3
|
nawabganj
|
|
2.30
|
|
|
291.20
|
M/S. Khosheda Enterprise
|
284.39
|
|
26/11/2018
|
01/12/2019
|
70
|
|
|
07/07/2020
|
|
107
|
GDP-3/D-16.
|
a. Improvement of Janttail UP Office-Dhapari Bazar-Gobindopur-Billpally-Bangla Bazar road at Ch.6000- 7000m & Ch. 7200-82000m. under Upazila Nawabganj Dist Dhaka. ID no 326623003. b. Improvement of Tikorpur RHD at H/O Omer Ali to Durgapur Bridge road at C
|
GDP-3
|
nawabganj
|
|
2.00
|
|
|
202.62
|
M/S. Bhuiyan & Brothers
|
189.11
|
|
28/10/2018
|
02/11/2019
|
30
|
|
|
05/11/2019
|
|
108
|
GDP-3/D-17.
|
a. Improvement of road from Alalpur Bazar to Joykrishnapur UP office road Ch. 2450-4730m. under Upazila Nawabganj Dist Dhaka. ID no 326623004. b. Improvement of road from Soto Kowniakandhi-Godaraghat-Boro-Kawniakandi Govt. Pry. School Soto Kowniakandhi-Ka
|
GDP-3
|
nawabganj
|
|
4.28
|
|
|
264.12
|
M/S. Bhuiyan & Brothers
|
246.56
|
|
28/10/2018
|
02/11/2019
|
30
|
|
|
05/10/2019
|
|
109
|
GDP-3/D-10.
|
Improvement of road from Baruakhali Govt. Primary School to Jamir Dewan house. by carpeting(Ch:00-560m) Id no: 326625089 under Upazila Nawabganj Dist Dhaka. T.ID: 207393
|
GDP-3
|
nawabganj
|
|
0.56
|
|
|
37.57
|
M/S. Nihon Trade International
|
35.69
|
|
05/09/2018
|
10/09/2019
|
100
|
|
|
08/07/2019
|
|
110
|
GDP-3/D-12.
|
Improvement of road from Shikaripara-Jamsha (Amtala)-Horikrishna Bari road ch.00-1000m. ID no:326624169 under Upazila Nawabganj Dist Dhaka. T.ID: 207395
|
GDP-3
|
nawabganj
|
|
1.00
|
|
|
61.35
|
M/S.Razia Enterprise
|
58.28
|
|
05/09/2018
|
10/09/2019
|
100
|
|
|
09/06/2019
|
|
111
|
GDP3/DReh-2.
|
Rehabilitation of Komorganj GC-Paragram GC via Koilail UP road Ch. 00-3700m Road ID 326622015 under Upazila Nawabganj District Dhaka. Salvage Amount Tk. 194150.00.
|
GDP-3
|
nawabganj
|
|
1.50
|
|
|
59.04
|
M/S. H.A.M Traders
|
56.09
|
|
16/05/2018
|
20/11/2018
|
100
|
|
|
|
|
112
|
GDP-3/D-65
|
a a) Improvement of Road from Jamgora Bottola Rupayoun Gate ( DEPZ road at Rion Complex (sytola)- Pabnertek via Jamgora Bottola Road by RCC at Ch. 680-1340m under Union: Yearpur, Upazila: Savar District: Dhaka Road ID No. 326724005
b) Improvement of Road from Gosbag H/O Faruk Khan- Hazibari Mosque-Dewan Filling station (Norshinghpur H/O Faruk Khan – Hajibari Mosque- Dewan Filling Station Rd) by BC Ch. 00-1050m under Union: Yearpur, Upazila: Savar District: Dhaka Road ID No. 326724351
Package no: GDP-3/D-65
|
GDP-3
|
savar
|
|
1.71
|
|
|
208.91
|
M/S. Boishakhi Enterprise
|
180.23
|
|
|
|
85
|
|
|
28/06/2022
|
|
113
|
Package no: GDP-3/D-64
|
a) Improvement of Road from BKSP- Koltasuti Road by RCC Ch. 00-932m under Union: Shimulia, Upazila: Savar District: Dhaka Road ID No. 326724083
b) Improvement of Road from Shimulia UP Rangamati Bridge to Shamerteshi (Shamerteki) Govt. Primary School by BC Ch. 00-1090m under Union: Shimulia, Upazila: Savar District: Dhaka Road ID No. 326725434
Package no: GDP-3/D-64
|
GDP-3
|
savar
|
|
2.02
|
|
|
267.13
|
M/S H. M. HELAL ENTERPRISE, Address: 885, East Shewrapara, Mirpur, Dhaka-1216
|
232.72
|
28/01/2020
|
|
25/12/2020
|
85
|
|
|
28/06/2022
|
|
114
|
Package no: GDP-3/D-82
|
a) Improvement of Nabi Textile Pacca Road at Shop of Abul to Kakratek (Kakrabak) by BC Road at Ch. 00-460m under Union: Shimulia, Upazila: Savar District: Dhaka Road ID No. 326725387 ( 326725474)
b) Improvement of Sadarpur Bottola Bazar Road H/O Azim Saheb- Uttor Walia Bridge Via Monohorpur Bridge ( Kalabagan- Walia road) by BC at Ch. 680-1405m. under Union: Pathalia, Upazila: Savar District: Dhaka Road ID No. 326725033
Package no: GDP-3/D-82
|
GDP-3
|
savar
|
|
0.46
|
|
|
91.49
|
M/S. Halimi Trade International, Address: 120/A C/A, Z, Shah House (3rd Floor), Motijheel, Dhaka-1000, Bangladesh
|
86.92
|
11/02/2020
|
|
17/11/2020
|
70
|
|
|
28/06/2022
|
|
115
|
GDP-3/D-66
|
Improvement of Harun Shaheb Dhakaria Factory to Boraibari Mosque Road by RCC Ch. 00-900m under Union: Shimulia, Upazila: Savar District: Dhaka Road ID No. 326724093 (326724439)
Package no: GDP-3/D-66
|
GDP-3
|
savar
|
|
0.90
|
|
|
155.37
|
M/S. Zillur Enterprise
|
132.01
|
|
|
|
35
|
|
|
28/06/2022
|
|
116
|
GDP-3/D-94
|
Improvement of Moddo Kolma Jame Mosque-East Kolma Amir Hossain (Hamja) House (Kolma winter Dress- Akter house via Fazol house) Road by RCC at Ch. 00-800m. under Union: Savar, Upazila: Savar District: Dhaka Road ID No. 326725157
Salvage amount Tk. 3,32,989.00
Package no: GDP-3/D-94
|
GDP-3
|
savar
|
|
0.80
|
|
|
190.02
|
A. S. M Mahabubur Rahman
|
163.89
|
|
|
|
35
|
|
|
28/06/2022
|
|
117
|
GDP-3/D-103
|
Improvement of Tulatuli-Jhaochar Road by BC at Ch. 00-1150m. under Union: Vakurta Upazila: Savar District: Dhaka Road ID No. 326724180
Package no: GDP-3/D-103
|
GDP-3
|
savar
|
|
1.15
|
|
|
94.90
|
R. P. Engineers
|
90.16
|
|
|
|
100
|
|
|
28/06/2022
|
|
118
|
GDP-3/D-89
|
Improvement of Vakurta High School Bilamalia Mouza Road Hindu Vakurta Kalidas house to Azim Uddin Land Road by BC at Ch. 00-810m. under Vakurta Union Upazila Savar District Dhaka. Road ID No.326724226
|
GDP-3
|
savar
|
326724226
|
0.81
|
|
|
67.85
|
Supti Construction
|
64.46
|
|
|
|
70
|
|
|
28/06/2022
|
|
119
|
GDP-3/D-106
|
a) Improvement of Jaduchar-Hemayetpur Bazar (Jadurchar Three Road More-Idrish Ali) Road at Ch.2415.00-2800.00m under Upazila: Savar District: Dhaka Road ID No. 326724009
b) Improvement of Varari-Tawel Factory Road By BC at Ch.800-1200.00m (Tetuljhora Three Road more Notunpara Mosque via Betor house road) under Upazila: Savar District: Dhaka Road ID No. 326725077
|
GDP-3
|
savar
|
326724009,326725077
|
0.78
|
|
|
71.08
|
Ifad Enterprise
|
67.47
|
02/09/2021
|
|
|
15
|
|
|
28/06/2022
|
|
120
|
GDP-3/D-107
|
a) Improvement of Moitri Sango field-Samsu Miah House Road By BC at Ch.600-825.00m (Shympur Moitri Sango Field-Nazma Afrin house via Dakkin Meitka road) under Upazila: Savar District: Dhaka Road ID No. 326724273
b) Improvement of Vakurta Madrasha-Abu Hujur Masjid Road By BC at Ch.00-165.00m (Vakurta ataur Rahman house to Kandi Vakurta Showkot Madbar Bari Mozammel Pokur road) under Upazila: Savar District: Dhaka Road ID No. 326724274)
|
GDP-3
|
savar
|
326724273,326724274
|
0.38
|
|
|
34.66
|
M/S Brothers &Son
|
33.88
|
12/09/2021
|
|
|
30
|
|
|
28/06/2022
|
|
121
|
GDP-3/D-108
|
Improvement of Amin Bazar Truck Terminal Cornal-Bordeshi Purbopara Mosque road by HBB Double layer from Ch.245-750.00mm (road ID No. 326725264)
|
GDP-3
|
savar
|
326725264
|
0.51
|
|
|
69.79
|
S N Associates
|
66.30
|
04/10/2021
|
|
|
80
|
|
|
28/06/2022
|
|
122
|
GDP-3/D-111
|
Improvement of Vakurta Dotto Market-Muktijoddha Siddiki Ullah road by RCC from Ch.00-1265.00mm (road ID No. 326724446)
|
GDP-3
|
savar
|
326724446
|
1.27
|
|
|
205.86
|
AR Enterprise
|
178.72
|
02/03/2022
|
|
|
20
|
|
|
28/06/2022
|
|
123
|
GDP-3/D-112
|
Improvement of Vakurta Dotto Market-Muktijoddha Siddiki Ullah road to Mazhrul Monir Road by RCC from Ch.00-732.00mm (road ID No. 326724447)
|
GDP-3
|
savar
|
326724447
|
0.73
|
|
|
136.31
|
Authentic Design & Development
|
129.23
|
22/12/2021
|
|
|
20
|
|
|
28/06/2022
|
|
124
|
GDP-3/D-125
|
Improvement of Madertek to Dickrirtek Molla Para Road by RCC from Ch.0.00- 174m &253-513m Pattalia UP under Union: Pattalia Upazila: Savar District: Dhaka Road ID No. 326725177
|
GDP-3
|
savar
|
326725177
|
0.43
|
|
|
75.44
|
M/S. Shampa Construction
|
71.66
|
01/03/2022
|
|
|
15
|
|
|
28/06/2022
|
|
125
|
GDP-3/D-71
|
Improvement of Gazirchat Dakshin Bapari Nabinagar (Baipaile) to – Kaliakoir (RHD) Connecting Road (Dendabar Officer’s Housing Montaj General Hospital to Gramin Tower road) by RCC at Ch. 750-1120m. under Upazila: Savar District: Dhaka Road ID No. 326724238
|
GDP-3
|
savar
|
326724238
|
0.75
|
|
|
87.19
|
RM Construction
|
82.83
|
28/11/2019
|
|
|
100
|
|
|
21/06/2022
|
|
126
|
GDP-3/D-68
|
a Improvement of Shimulia Up Rangamaty- Amtola Pacca Road to South Side of Chalapara Mosque Rangamaty- Amtola BC Road to South Side of Chalapara Mosque Road by RCC at Ch. 00-550m under Shimulia Union Upazila Savar District Dhaka Road ID No. 326725436.
b Improvement of Mollerbag Doctor Vila to H/O Hazi Elias Ali via kaltasuti Pacca Mollerbag vila to Kaltasuti Pacca Road via H/O Hazi Elias Road by BC Ch. 00-500m under Shimulia Union Upazila Savar District Dhaka Road ID No. 326725388
|
GDP-3
|
savar
|
326725436,326725388
|
1.50
|
|
|
135.54
|
M/S. Mem Enterprise
|
164.44
|
29/10/2019
|
|
|
100
|
|
|
21/06/2022
|
|
127
|
GDP-3/D-81
|
Improvement of Borowalia Tin Raster More Bashjar- Dakhinwalia Salam Shop via H/O Hakim via Dakhin Walia Graveyard Road by BC at Ch. 00-1000m. under Pathalia Union Upazila Savar District Dhaka Road ID No. 326725470 Salvage Cost 377233.0. T.ID: 376667
|
GDP-3
|
savar
|
326725470
|
1.00
|
|
|
74.06
|
Shadab Construction
|
70.35
|
02/11/2020
|
|
|
100
|
|
|
21/06/2022
|
|
128
|
GDP-3/D-105
|
a. Improvement of Savar DOHS Pollybiddut Gat-Shritishodho Gate (Niribili) Road by BC at Ch. 00-1250.00m. (Double lane- 2 x 1250.00m = 2500.00m) under Upazila: Savar District: Dhaka Road ID No. 326724444
b Improvement of Savar DOHS – Cantonment Road by BC at Ch. 00-865.00m. under Upazila: Savar District: Dhaka Road ID No. 326724452
|
GDP-3
|
savar
|
326724444,326724452
|
2.11
|
|
|
338.44
|
Ayesha Enterprise
|
312.72
|
02/08/2021
|
|
|
20
|
|
|
21/06/2022
|
|
129
|
GDP-3/D-126
|
Improvement of Sreepur Bazar-Gohail Bari via Subondi and Dhamsona UP Road by RCC from Ch.4660-5410m under Union: Dhamsona Upazila: Savar District: Dhaka Road ID No. 326723007
|
GDP-3
|
savar
|
326723007
|
0.75
|
|
|
136.22
|
Eshan Enterprise
|
129.41
|
01/03/2022
|
|
|
0
|
|
|
21/06/2022
|
|
130
|
GDP-3/D-127
|
Improvement of Dhamsona-Gopalbari-Unail Road (Unail Madrasha Market to Goal tek shop) by RCC from Ch.300-1020m under Union: Dhamsona Upazila: Savar District: Dhaka Road ID No. 326724341 .
|
GDP-3
|
savar
|
326724341
|
0.72
|
|
|
136.90
|
Purnima Traders
|
130.05
|
01/03/2022
|
|
|
10
|
|
|
21/06/2022
|
|
131
|
GDP-3/D-128
|
Improvement of (Nayer Hat) Bongshi Clinic-North Side Mosque Road by RCC from Ch.00-170m under Union: Pattalia Upazila: Savar District: Dhaka Road ID No. 326725421
|
GDP-3
|
savar
|
326725421
|
0.17
|
|
|
31.49
|
Rixon Digital
|
29.91
|
01/03/2022
|
|
|
0
|
|
|
21/06/2022
|
|
132
|
GDP-3/D-129
|
Improvement of Dhorenda Bazar to Sadullapur Bazar via Kolma Road (Dharenda BC Road to YWCA) Road by RCC from Ch.00-570m under Union: Dhamsona Upazila: Savar District: Dhaka Road ID No. 326724092
|
GDP-3
|
savar
|
326724092
|
0.57
|
|
|
92.24
|
M/S. Saracen Corporation
|
87.63
|
13/02/2022
|
|
|
50
|
|
|
21/06/2022
|
|
133
|
GDP-3/D-130
|
Improvement of Nimertek shab Uddin's More purbo chak via Mohabbot hazi chak Road by RCC from Ch.00-180m under Union: Tetulzura Upazila: Savar District: Dhaka Road ID No. 326725262
|
GDP-3
|
savar
|
326725262
|
0.18
|
|
|
27.76
|
Aamaira Construction & Co.
|
26.37
|
09/02/2022
|
|
|
100
|
|
|
21/06/2022
|
|
134
|
GDP-3/D-131
|
Improvement of Polashbari Bottola-Kamal Garments via H/O Sanaullah Road by RCC from Ch.00-420m under Union: Dhamsona Upazila: Savar District: Dhaka Road ID No. 326724292
|
GDP-3
|
savar
|
326724292
|
0.42
|
|
|
125.69
|
SIGN ENGINEERING LIMITED
|
119.40
|
13/03/2022
|
|
|
0
|
|
|
21/06/2022
|
|
135
|
GDP-3/D-132
|
Improvement of Hemayetpur Bazar (Jadur Char)-Vakurta UP (Hindu Vakurta) Road by RCC from Ch.750-1492m under Union: Dhamsona Upazila: Savar District: Dhaka Road ID No. 326723008 .
|
GDP-3
|
savar
|
326723008
|
0.74
|
|
|
166.24
|
Atik Construction
|
157.93
|
28/02/2022
|
|
|
0
|
|
|
21/06/2022
|
|
136
|
GDP-3/D-134
|
Improvement of Dendabor-Falgoni Road by RCC from Ch.00-1110m under Union: Dhamsona Upazila: Savar District: Dhaka Road ID No. 326724298
|
GDP-3
|
savar
|
326724298
|
1.11
|
|
|
228.00
|
Mohammed Eunus & Brothers (Pvt.) Ltd.
|
204.71
|
23/03/2022
|
|
|
0
|
|
|
21/06/2022
|
|
137
|
GDP-3/D-48
|
Improvement of Dandabor MP. Checkpost- Niribili RHD. Road from Ch. 280-905m under Basta UP Upazila Keraniganj District Dhaka. ID no326724087 salvage amount Tk. 367331.00.
|
GDP-3
|
savar
|
326724087
|
0.62
|
|
|
52.02
|
Mayer Doya Construction
|
49.42
|
31/07/2019
|
|
|
100
|
|
|
20/06/2022
|
|
138
|
GDP-3/D-69
|
Improvement of Fulbaria Busstand bazar-Bongaon UP (Konda bazar) via Balighata (Rajaghat Anwar Engineer House-Khatrapara Mdrasha Road by RCC at Ch. 1480-2230. under Upaila: Savar District: Dhaka. Road ID No. 326723014.
|
GDP-3
|
savar
|
326723014
|
0.77
|
|
|
144.45
|
Voice Communication
|
137.23
|
28/11/2019
|
|
|
100
|
|
|
20/06/2022
|
|
139
|
GDP-3/D-70
|
Improvement of Uttar Gazirchat Sharif Villa- Burir Bazar by RCC Road at Ch. 00-445m under Upazila: Savar District: Dhaka Road ID No. 326725444
|
GDP-3
|
savar
|
326725444
|
0.45
|
|
|
87.50
|
Kamal Enterprise
|
83.13
|
28/11/2019
|
|
|
100
|
|
|
20/06/2022
|
|
140
|
GDP-3/D-136
|
Improvement of DEPZ-Secretariat Housing Socity-Pabnartek Road by RCC from Ch.00-1120m under Union: Dhamsona Upazila: Savar District: Dhaka Road ID No. 326724060
|
GDP-3
|
savar
|
326724060
|
1.12
|
|
|
397.00
|
LE-ARE JV
|
356.73
|
08/03/2022
|
|
16/09/2023
|
0
|
|
|
16/06/2022
|
|
141
|
GDP-3/D-137
|
Improvement of Hemayetpur Bazar (Jadur Char)-Vakurta UP (Hindu Vakurta) Road by RCC from Ch.2037-3407m under Union: Dhamsona Upazila: Savar District: Dhaka Road ID No. 326723008
|
GDP-3
|
savar
|
326723008
|
1.37
|
|
|
304.00
|
AR Enterprise
|
27279548.10
|
08/03/2022
|
|
16/09/2023
|
0
|
|
|
15/06/2022
|
|
142
|
Package no: GDP-3/D-72
|
Improvement of Unique Munshibari via Gazirchat high School road (Gazirchat Unique- School road) Road by RCC at Ch. 750-1750m. under Union: Dhamsona, Upazila: Savar District: Dhaka Road ID No. 326724052
Package no: GDP-3/D-72
|
GDP-3
|
savar
|
|
1.00
|
|
|
190.28
|
M/S. Boishakhi Enterprise, Address: B#25, Mannan Plaza (2nd floor), Khilkhet Bazar, Shop-22, Dhaka-1229
|
164.81
|
26/01/2020
|
|
01/02/2021
|
75
|
|
|
09/11/2021
|
|
143
|
GDP-3/D-19
|
Improvement of Kobirpur BazarShimulia UP via Baidgaon High School Road by RCC Ch. 2850-3700m under Upazila Savar District Dhaka. Road ID no 326723028 B. Improvement of Mograkanda Poultry firm-Solaimarket via H/O. Ansar Ali road Ch. 00-625m under Upazila S
|
GDP-3
|
savar
|
|
1.76
|
|
|
274.23
|
M/S. Boishakhi Enterprise
|
258.96
|
|
|
|
45
|
|
|
06/10/2021
|
|
144
|
Package no: GDP-3/D-62
|
Improvement of Gomail Pacca road to Shin Shin App.-Gorat Satter Market by BC at ch. 00-800m .under Union : Yearpur ,Upazila: Savar ,District: Dhaka Road ID No. 326725362 Salvage amount Tk. 7,32,236.00
Package no: GDP-3/D- 62
|
GDP-3
|
savar
|
|
0.85
|
|
|
66.88
|
Brothers Enterprise Prop: Mr. Mohammad Aminul Islam, Address: Sutar Para, Halar Bazar, Dohar, Dhaka
|
63.54
|
24/09/2019
|
|
29/05/2020
|
75
|
|
|
04/10/2021
|
|
145
|
GDP-3/D-95
|
Improvement of Kolma 2no. Busstand-Shohan Pultry farm rd. (Kolma 02 no Modon house-Mozum Ali house via Zabber house) Road by RCC at Ch. 00-240m under Union : Savar Upazila: Savar District: Dhaka Road ID No. 326725226
Package no: GDP-3/D-95
|
GDP-3
|
savar
|
|
0.24
|
|
|
56.89
|
Buildex International
|
54.05
|
|
|
|
100
|
|
|
04/10/2021
|
|
146
|
Package no: GDP-3/D-63
|
Improvement of Boro Walia Mehegoni Bagan (H/O Hazi Md. Intaz Ali) - Socity Taru Madbar- Islam nagar New Carpeting Via H/O Malek Mridha) ((Boro Walia Mehegoni Bagan – Taru Madbar socity – Islamnagar Road)) by RCC at ch. 00-850m under Union: Pathalia, Upazila: Savar, District: Dhaka Road ID No. 326725471
Package no: GDP-3/D-63
|
GDP-3
|
savar
|
|
0.85
|
|
|
123.96
|
M/S M S A Construction & Engineering, Address: 596, West Shewrapara, Mirpur, Dhaka-1216
|
107.41
|
|
|
|
100
|
|
|
04/02/2021
|
|
147
|
GDP-3/D- 70
|
Improvement of Uttar Gazirchat Sharif Villa- Burir Bazar by RCC Road at Ch. 00-445m under Union: Dhamsona, Upazila: Savar District: Dhaka Road ID No. 326725444
Package no: GDP-3/D- 70
|
GDP-3
|
savar
|
|
0.45
|
|
|
87.50
|
Kamal Enterprise
|
83.12
|
|
|
|
100
|
|
|
06/12/2020
|
|
148
|
GDP-3/D- 67
|
Improvement of Sathy Textile to Muslimtek road by RCC at Ch. 00-690m under Union: Shimulia, Upazila: Savar, District: Dhaka Road ID No. 326724094 (326725476)
Package no: GDP-3/D- 67
|
GDP-3
|
savar
|
|
0.69
|
|
|
147.27
|
M/S. Nizam Uddin Enterprise
|
139.90
|
|
|
|
100
|
|
|
06/12/2020
|
|
149
|
GDP-3/D-96
|
Improvement of Khejurtack Bishas para (Khejurtack Bazar pacca road- Bishas para) Road by RCC at Ch. 00-295m. under Union: Pathalia Upazila: Savar District: Dhaka Road ID No. 326725427
Package no: GDP-3/D-96
|
GDP-3
|
savar
|
|
0.30
|
|
|
70.06
|
M/S. Mem Enterprise
|
66.56
|
|
|
|
100
|
|
|
07/09/2020
|
|
150
|
GDP-3/D-Reh-32.
|
a) Maintenance of Varalipara Shamlashi- Baherpur (Baherchar) Road at (Ch.0+000-1+844km) under Savar Upazila, District Dhaka Road ID No. 326724035
b) Maintenance of Hemaetpur Bus stand Joynabari varai Road at (Ch.1650-2650m.) under Savar Upazila, District Dhaka Road ID No. 326724101
c) Maintenance of Chan Mia Member house-Firing Renge via Usha Poultry Farm Road at (Ch.00-670m.) under Savar Upazila, District Dhaka Road ID No. 326724243
|
GDP-3
|
savar
|
|
3.51
|
|
|
115.45
|
FASTBUILD, Prop: Mr. Mohammad Jewel, Address: 43/R-10, Indira Road, Panthpath, Dhaka
|
109.67
|
29/01/2019
|
|
|
100
|
|
|
01/01/2020
|
|
151
|
GDP-3/D-30
|
a Improvement of Kaisharchar-Nonder Khamar Kheaghat Road Kaisharchar pucca road via Domrakanda madrasha Nonder Khamar Ch. 00 to 1000m under Upazila Savar District Dhaka. Road ID no 326724270. Total salvage amount Tk. 348995.00 b Improvement of Chunarchar
|
GDP-3
|
savar
|
|
1.00
|
|
|
128.86
|
M/S Sumon Enterprise
|
122.42
|
|
|
|
100
|
|
|
09/10/2019
|
|
152
|
GDP-IV/DHK/DHAM/WR-32.
|
1.Improvement of Sutipara UP Office to Ganggotia UP Office road by BC at Ch.1000-3130m 2.Improvement of Vatarkhola Nawga road by BC at Ch.00-1750m
|
GDP-4
|
dhamrai
|
326143011 326145068
|
3.88
|
|
|
306.62
|
AR-Enterprise
|
285.12
|
09/12/2019
|
|
14/12/2020
|
30
|
|
|
01/10/2020
|
|
153
|
GDP-IV/DHK/DHAM/WR-252.
|
Improvement of Aralia Bazar to Mohonpur Kheyaghat road by BC at Ch.00-2321m Salvage amount180412.00
|
GDP-4
|
dhamrai
|
326144138
|
2.62
|
|
|
173.80
|
Fast Build
|
173.45
|
09/12/2019
|
|
02/11/2020
|
60
|
|
|
01/10/2020
|
|
154
|
GDP-IV/DHK/DHAM/WR-253.
|
1.Improvement of Kelia Bhum south road Palli Salam house to Nawga Kait bazar road by BC at Ch.00-2000m 2.Improvement of Dhamrai Fire Service Office to Kolla UP Office road by BC at Ch.500-1500m . Salvage amount560920.00
|
GDP-4
|
dhamrai
|
326144139 326145111
|
3.00
|
|
|
228.66
|
H.M Trade
|
206.54
|
13/01/2020
|
|
20/12/2020
|
5
|
|
|
01/10/2020
|
|
155
|
GDP-IV/DHK/DHAM/WR-254.
|
1.Improvement of Batholi Steel Bridge to Dhaka Aricha Road via Lolitnagor and Kandapara road Dhamrai Side road by BC at Ch.00-1500m 2.Improvement of Batholi Dharai Dhamtara GC Sharifbag Akkash Bari to Sharifbag Chorapara river ghat road by BC at Ch.00-800m Salvage amount453952.00
|
GDP-4
|
dhamrai
|
|
|
|
|
179.88
|
M/S Maisha Construction (PVT) LTD
|
162.92
|
26/12/2019
|
|
20/01/2021
|
10
|
|
|
01/10/2020
|
|
156
|
GDP-IV/ DHK/DHAM/W(R)-255
|
1.Improvement of Bordail to Chowtail road by BC at Ch.00-2070m 2.Improvement of Shitakali bazar to Barigaw road by BC at Ch.00-450mSalvage amount1151465.00
|
GDP-4
|
dhamrai
|
326145072 326145058
|
2.52
|
|
|
199.33
|
M/S Maisha Construction (PVT) LTD
|
185.74
|
26/12/2019
|
|
02/11/2020
|
10
|
|
|
01/10/2020
|
|
157
|
GDP-IV/ DHK/DHAM/W(R)-263
|
1. Improvement of Joypura Mohammad Ali House to Kaitamara Bridge via Awlad Mill road from Ch. 0000km-2820km by Bituminous Carpeting 2.Improvement of Nayapara to Charpara via Asrayan Prokolpo road from Ch. 0000km-0910km by Bituminous Carpeting Salvage amount Tk.1505047.00
|
GDP-4
|
dhamrai
|
326144162 326145094
|
2.82
|
|
|
279.72
|
Sraboni Construction
|
251.98
|
06/04/2020
|
|
13/04/2021
|
15
|
|
|
01/10/2020
|
|
158
|
GDP-IV/DHK/DHAM/WR-266
|
1.Improvement of Jalsha to Datto Nalaj road from Ch. 1000km-2064km by Bituminous Carpeting 2.Improvement of Kawalipara Bridge to Jalsha High school road Ch. 0000km-1816km by Bituminous Carpeting
|
GDP-4
|
dhamrai
|
326144068 326145123
|
2.88
|
|
|
219.02
|
Sraboni Construction
|
202.37
|
12/04/2020
|
|
13/04/2021
|
15
|
|
|
01/10/2020
|
|
159
|
GDP-IV/DHK/DHAM/WR-331.
|
1. Improvement of Chowhat Bazar Palpara More to Paragram RHD road at Ch. 00-1215km by Bituminous Carpeting 2. Improvement of Chowhat Bazar to Bangala Bazar road at Ch. 1000-1955km by Bituminous Carpeting under 3.Improvement of Faringa Mamun house to Battola Crematorium Ghat road at Ch 00-450m by Bituminous Carpeting Salvage amount Tk 388080.00
|
GDP-4
|
dhamrai
|
326144136 326145047 326144174
|
1.96
|
|
65
|
198.06
|
Geneva International
|
196.94
|
01/01/2020
|
|
15/12/2020
|
70
|
108.00
|
65
|
01/10/2020
|
|
160
|
GDP-IV/DHK/DHAM/WR-338.
|
Construction of 54.00m Long RCC Girder Bridge on Dhamrai GC - Shimulia GC via Kakran Bazar at Ch. 550m
|
GDP-4
|
dhamrai
|
326142013
|
|
54.00
|
|
446.48
|
M/S Kofil Enterprise & M/S Islam Construction (JV)
|
445.30
|
14/07/2020
|
|
20/07/2021
|
0
|
|
|
01/10/2020
|
|
161
|
GDP-IV/DHK/DHAM/WR-339.
|
Construction of 32.00m Long PC Girder Bridge on Khararchar Bazar Kansha Kheyaghat Road via Pachufakir House at Ch. 290m
|
GDP-4
|
dhamrai
|
326144063
|
|
32.00
|
|
208.05
|
M/S Abser Construction
|
222.15
|
|
|
|
0
|
|
|
01/10/2020
|
|
162
|
GDP-IV/ DHK/DHAM/W(R)-340
|
Construction of 46.00m Long RCC Girder Bridge on Jalsin Bazar - Laruakundo Pucca Road via Shawrail Village at Ch. 1000m
|
GDP-4
|
dhamrai
|
326144135
|
|
46.00
|
|
296.18
|
M/S. Shahana Enterprise Sazzad Barkat Construction & Engineens Ltd (JV)
|
300.00
|
30/06/2020
|
|
06/10/2021
|
0
|
|
|
01/10/2020
|
|
163
|
GDP-IV/DHK/DOH/WR-197
|
1.Improvement of Charboita Mosque to Chardewvog road by BC at Ch.00-2060m Road ID 326184044 under Dohar Upazila Dist Dhaka.2.Rehabilitation of Kharia-Dhalarpar-Goraban road by BC at Ch.00-540m Road ID 326184002 under Dohar Upazila Dist Dhaka. 3.Rehabilitation of Teen Dokan Bainnarbara Fultala Moksodpur Teen Dokan Bainnarbara road by BC at Ch.340-1580m Road ID 326184004 under Dohar Upazila Dist Dhaka.Salvage amount 48604.00
|
GDP-4
|
dohar
|
326184044, 326184002, 326184004
|
2.94
|
0.00
|
100
|
264.97
|
M/s. Zillur Ent
|
242.31
|
26/12/2019
|
|
01/01/2021
|
100
|
242.24
|
100
|
07/11/2022
|
|
164
|
GDP-IV/DHK/DOH/WR-201
|
1.Improvement of Shilakotha Monai Fakir House to Afzal Shikder House Via Charporolia Govt. Primary School road by BC at Ch.00-1220m Road ID 326185058 under Dohar Upazila Dist Dhaka. 2.Improvement of Banaghata Bashir House - Nikra Paka Bridge South Para- Nikra Koborsthan to Padma Baipas road by BC at Ch.800-1430m Road ID 326184178 under Dohar Upazila Dist Dhaka.3.Improvement of Holer Bazar-Alami Bazar to Mizan Nagor road by BC at Ch.3450-3843m Road ID 326184061 under Dohar Upazila Dist Dhaka. Salvage amount2633616.00
|
GDP-4
|
dohar
|
326185058, 326184178, 326184061
|
2.24
|
|
50
|
264.97
|
M/s. Zillur Enterprise
|
172.61
|
22/12/2019
|
|
28/12/2020
|
80
|
93.39
|
50
|
07/11/2022
|
|
165
|
Package No- GDP-IV/DHK/DOH/WR-199
|
1. Improvement of Goraban Mosque-Mahamainka Mosque-Dhalarpar H/O Mostaque Road. By BC Ch00-850m under Dohar Upazila Dist Dhaka. 2. Improvement of Haller Bazar-Modhurchar Ashram Road Sutarpara Haller Bazar- Gandhiji Ashram By BC Ch615-1000m 3. Improvement of Alamin Bazar H/O Murad Khan -Shop Of Hossain Molla Road. Sutarpara Hossain Mollah Shop - Murad Member House - Alamin Bazar Graveyard Road By BC at Ch.00-1070m under Dohar Upazila Dist Dhaka. Salvage amount 478414.00.
|
GDP-4
|
dohar
|
326184128, 326184043, 326184170
|
0.62
|
|
|
183.55
|
R/S Trading Corporation, Mirpur , Dhaka
|
181.63
|
|
|
|
0
|
|
|
07/09/2020
|
|
166
|
GDP-IV/ DHK/DOH/W(R)-204
|
1.Improvement of MazhircharPurbo char Samad Member house to Mohon Mridha House road by BC at Ch.00-915m ,under Dohar Upazila Dist Dhaka.2. Improvement of Radhnagor Bridge to Mazhirchar Madrasha road by BC at Ch.00-1200m under Dohar Upazila Dist Dhaka. Salvage amount1763833.00
|
GDP-4
|
dohar
|
326184201 326184034
|
2.12
|
|
|
177.82
|
M/S. Prime International & Class One Traders (JV)
|
162.39
|
23/01/2020
|
|
30/01/2021
|
0
|
|
|
07/09/2020
|
|
167
|
GDP-IV/DHK/DOH/WR-196
|
Construction of 2x3.50x4.00m Span RCC Box Culvert on Tin Dokan Bainna Bari road at Ch. 400m. under Dohar Upazila District Dhaka. Road ID 326184004
|
GDP-4
|
dohar
|
326184004
|
|
0.04
|
100
|
21.46
|
Mayer Doya Construction
|
20.38
|
30/06/2019
|
|
31/12/2019
|
100
|
20.32
|
100
|
06/09/2020
|
|
168
|
GDP-IV/DHK/KERA/WR-231
|
Development of Kalindi Girls School to Jinzira Sayadpur Road via Borishur Bazar Road by RCC from Ch. 00-790 m
|
GDP-4
|
keraniganj
|
326384038
|
|
|
|
243.00
|
M/S Rashid & Brothers
|
184.20
|
|
|
|
0
|
|
|
01/10/2020
|
|
169
|
GDP-IV/ DHK/KERA/ W(R)-234
|
Development of Dhaka Mawa Road to Khejurbag Road By RCC from Ch. 0m-850.50m
|
GDP-4
|
keraniganj
|
326384040
|
0.85
|
|
|
258.12
|
M/S Rashid & Brothers
|
0.00
|
|
|
|
0
|
|
|
01/10/2020
|
|
170
|
GDP-IV/DHK/KERA/WR-343
|
a. Improvement of Aksail Sutkir teck to Kathaltoli road by BC from ch. 1000m-2500m b. Improvement of Natunchar Foot Bridge to West Mugarchar road by BC from Ch. 0m- 1500m c. Improvement of Modhurchar Natun Bazar to Modhurchar River Ghat Road at Ch. 00m-750m
|
GDP-4
|
keraniganj
|
|
3.75
|
|
|
283.57
|
Mis Basori Traders
|
283.54
|
16/07/2020
|
|
30/06/2021
|
0
|
|
|
01/10/2020
|
|
171
|
GDP-IV/DHK/KER/WR-230
|
1.Improvement of Potkajor Awal Shaheber Bari - Rahim Chowdhury Bari Via Madaripur Mosque road by RCC at Ch.00-400m 2. Improvement of Ruhitpur Bazar to Modho Dharmosur road by BC at Ch.00-1500m Salvage amount265584.00 3.Improvement of Kalatiya Niloy Bus Stand to Ashamdipur via T&T UP Office road by RCC at Ch.1000-2200m. Salvage amount187243.00
|
GDP-4
|
keraniganj
|
|
3.10
|
|
|
394.16
|
|
0.00
|
|
|
|
0
|
|
|
01/10/2020
|
|
172
|
GDP-IV/DHK/KERA/WR-232
|
1.Improvement of Road from Razeandropur Graveyard to H/O Bodi road by RCC at Ch.00-500m 2.Improvement of road from Dhaka - Mawa Highway to Paina Khalpar via Nayagaon road by BC at Ch.00-2500m 3.Improvement of Maniknagar - Dhalikandi road by BC at Ch.00-950m Salvage amount 360647.00 4.Improvement of Hasnabad Government Primary School Road by RCC and Sewerage line at Ch.00-215m
|
GDP-4
|
keraniganj
|
326385154 ,326384049, 326385001, 326385071
|
3.22
|
|
|
433.62
|
|
0.00
|
|
|
|
0
|
|
|
01/10/2020
|
|
173
|
GDP-IV/DHK/KERA/WR-233
|
1.Improvement of Hasnabad Chairman Bari Road by RCC and Sewerage line at Ch.00-250m 2.Improvement of road from Hasnabad Hospital to Hasnabad Mazar road by RCC and Sewerage line at Ch.00-500m 3.Improvement of Road from Zinzira - Syedpur R&H to H/O Mr. Montu road by RCC at Ch.00-538m 4.Improvement of road from Notun Bakterchar H/O Rahman Member to Bakul KG School Road by RCC at Ch.00-400m
|
GDP-4
|
keraniganj
|
326385162 326385072 326385093 326384147
|
1.69
|
|
|
370.90
|
|
0.00
|
|
|
|
0
|
|
|
01/10/2020
|
|
174
|
GDP-IV/KERA/WR-235
|
1.Improvement of road from Hasnabad power station to Mollarhat road via bibir bazar Hasnabad Part by RCC and Sewerage line at Ch.00-400m 2.Improvement of road from Sirajnagar Main Road to River Ghat road by RCC Ch.00-522.45m 3.Improvement of Road from Golam Bazar Khalpar to Habib Nagar road by RCC at Ch.00-194.40m
|
GDP-4
|
keraniganj
|
326382002 326385210 326385509
|
1.12
|
|
|
277.44
|
|
0.00
|
|
|
|
0
|
|
|
01/10/2020
|
|
175
|
GDP-IV/DHK/KERA/WR-229
|
a. Development of Ghatter Char School More to Basila Bridge Approch road by RCC from Ch. 0m-900m under Taranagor union upazila Keraniganj Dist Dhaka. b Development of Golam Bazar Khalpara to Habibnagor road by RCC from Ch. 0m-194.40 m under Suvaddya union upazila Keraniganj Dist Dhaka. Improvement of Mandail Durgamondir - Abu Hazis house via Kali Mondir under Zinzira union by RCC pavement
|
GDP-4
|
keraniganj
|
326385125, 326385511
|
1.09
|
|
|
235.17
|
M/S Rashid & Brothers
|
186.96
|
|
|
|
0
|
|
|
07/09/2020
|
|
176
|
GDP-IV/ DHK/NAW/W(R)-211
|
Improvement of road from Tetenga Govt. Primary School Road - Meleng Bazar Road Under Unioun Koilail Upazila. Nawabganj Dist. Dhaka. Ch.1500-3000m By BC . under Nawabganj Upazila Dist Dhaka. Salvage amount 826340.00.
|
GDP-4
|
nawabganj
|
326625142
|
1.50
|
|
100
|
118.78
|
M/S Nobi Enterprise
|
112.84
|
09/02/2020
|
|
23/12/2020
|
100
|
112.69
|
100
|
07/11/2022
|
|
177
|
GDP-IV/DHK/NAW/WR-226.
|
1.Improvement of Barowakhali union Kumar Barilla School attached Alal Matbar house to Kazi Bari Kandabarilla to Dawotpur bridge road by BC at Ch.00-1600m under Nawabganj Upazila Dist Dhaka.2.Improvement of Barowakhali union Chatrapur Main Road to Kalimondir road by BC at Ch.00-500m under Nawabganj Upazila Dist Dhaka.
|
GDP-4
|
nawabganj
|
326624327, 326624328
|
2.10
|
|
|
150.76
|
M/S. Prime International & Class One Traders (JV)
|
139.20
|
23/01/2020
|
|
30/01/2021
|
0
|
|
|
07/09/2020
|
|
178
|
GDP-IV/DHK/NAW/WR-225
|
1.Improvement of Wazzuddin Member House to Ansar Madbar house via Anis Member house At Noyonshre road by Carpeting at Ch.00-900m under Nawabganj Upazila Dist Dhaka.2.Improvement of Boktar Nagor Jamider House Bridge to Surendra Halder House via Panji Prohori road by Carpeting at Ch.00-725m under Nawabganj Upazila Dist Dhaka. Salvage amount 227430.00
|
GDP-4
|
nawabganj
|
326624329 ,326625087
|
1.63
|
|
|
115.01
|
M/S. Prime International & Class One Traders (JV)
|
105.74
|
23/01/2020
|
|
30/01/2021
|
0
|
|
|
07/09/2020
|
|
179
|
GDP-IV/ DHK/NAW/ W(R)-30
|
a Improvement of Barrah-Kandamatra-Indrokhali- Vaoalia road by BC at Ch 00-800m under Upazila Nawabganj Dist Dhaka.b) Improvement road from RHD at PKB High School to House of Yousuf Professor road by BC at Ch.00-1000m under Upazila Nawabganj Dist Dhaka.c) Improvement of of Bardhonpara RHD to Gayanhati park road RHD at Bardhanpara Isamoti River Ghat-Gayanhati Boxonagar UP road. by BC at Ch.00-1000m under Upazila Nawabganj Dist Dhaka. Salvage 1876485.00
|
GDP-4
|
nawabganj
|
326623029 326624150 326624150
|
2.80
|
|
|
217.90
|
Purnima-Toaha (JV) komorgonj, Nawabganj,Dhaka
|
217.22
|
|
|
|
0
|
|
|
07/09/2020
|
|
180
|
GDP-IV/DHK/NAW/WR-3
|
Improvement of road from Nawabganj GC to Komorganj GC via Barrah UP Office under Upazila Nawabganj District Dhaka Ch.940 to 3050 m By BC . Salvage amount 2138128.00
|
GDP-4
|
nawabganj
|
326622010
|
|
|
|
206.87
|
M/S Saymum Traders
|
189.30
|
19/02/2020
|
|
10/01/2021
|
0
|
|
|
07/09/2020
|
|
181
|
GDP-IV/DHK/SAV/WR-250
|
1. Improvement of Dewan Chowrasta- Sudorshon house road by HBB at Ch.00-240m Road ID 326725480 under Savar upazila Dist Dhaka.
2. Improvement of Kashipur Beparipara- Borowalia Kendrio Kabarsthan road kashipur- Dewantek-Beparipara road road by HBB at Ch.00-345m Road ID 326725038 under Savar upazila Dist Dhaka.
3. Improvement Gokulnagar-Nampara-Monohar Bridge road by HBB at Ch.00-490m Road ID 326724212 under Savar upazila Dist Dhaka. 4. Improvement of Madertek- Chouaripara-Noadda road by HBB at Ch.40-840m Road ID 326725191 under Savar upazila Dist Dhaka. Salvage amount 151650.00
|
GDP-4
|
savar
|
326725480, 326725038, 326724212, 326725191
|
1.88
|
|
85
|
139.55
|
M/S. Shanaj International
|
132.58
|
27/11/2019
|
|
30/06/2021
|
100
|
64.85
|
85
|
30/10/2022
|
|
182
|
GDP-IV/DHA/SAV/W(R)-241.ID-315706
|
Improvement of Nekibari Shastha Complex- Kabarsthan-2no. Word Burirtek Abdul Aziz Shaheb house road at Ch. 00-360m by RCC pavement & Pipe drain.
Road ID- 326724442
|
GDP-4
|
savar
|
326724442
|
0.36
|
0.00
|
100
|
67.87
|
M/S Labib Enterprise
|
64.48
|
01/01/1900
|
|
22/02/2020
|
100
|
64.43
|
100
|
10/10/2022
|
|
183
|
GDP-IV/DHA/SAV/W(R)-247.ID-315707
|
1. Improvement by RCC Boro Walia Engineer Market- Nazmul Villa RD. Islamnagar Rahman Market- Walia Lalon Shahebhouse- Nazmul Villa Rd. at Ch. 00-236m.
(Road ID- 326725487)
2. Improvement by HBB Mirertek- Shadarpur Tinraster Mor road From Ch. 00-1000m with Connecting to Graveyard.
(Road ID- 326725030)
|
GDP-4
|
savar
|
|
1.00
|
0.00
|
100
|
102.63
|
RM Constraction
|
97.50
|
01/01/1900
|
|
22/12/2019
|
100
|
96.89
|
100
|
10/10/2022
|
|
184
|
GDP-IV/DHA/SAV/WR-237
|
1. Improvement of Goshbag Bus Stand to Bhuyan para Jame Mosque road by RCC at under Savar Upazila Dist Dhaka. 2. Improvement of Jamgora Anower Filling West Side-Sin Sin Garments Via Dorgapara via Dorgapara road by RCC at under Savar Upazila Dist Dhaka. Salvage amount 184880.00
|
GDP-4
|
savar
|
326724276 , 3326724407
|
0.75
|
|
100
|
122.06
|
M/S Shampa Construction
|
115.96
|
24/11/2019
|
|
30/11/2020
|
100
|
115.90
|
100
|
10/10/2022
|
|
185
|
GDP-IV/DHA/SAV/WR-238
|
1. Improvement of Kotapara Mahigoal Tea shop to Konda Hindupara Bashir house road by RCC at Ch.00-770m Road ID 326724441 under Savar Upazila Dist Dhaka. 2. Improvement of Dendabar Gramin Tower to Officers Housing Mosque road by RCC at Ch.105-385m Road ID 326725477 under Savar Upazila Dist Dhaka. Salvage amount 444224.00
|
GDP-4
|
savar
|
326724441, 326725477
|
1.05
|
0.00
|
100
|
216.76
|
M/S AR Enterprise
|
187.73
|
15/01/2020
|
|
21/01/2021
|
100
|
187.72
|
100
|
10/10/2022
|
|
186
|
GDP-IV/DHA/SAV/WR-239
|
1. Improvement of Purbo Islam nagor Enam road Culvert-H/O Nuru Hazi via Dr. Afzal Kashipur H/O Mohammad Ali - Boaliapara Pucca road via Kalimondir road by RCC at Ch.00-280m Road ID 326725492 under Savar Upazila Dist Dhaka. 2. Improvement of Nabinagar Bazar - Pathalia UP via Charigram & Gopinathpur Road by RCC at Ch.435-615m Road ID 326723023 under Savar Upazila Dist Dhaka. 3. Improvement of Gerua bazar-Jamshing road by RCC at Ch.200-500m Road ID 326724190 under Savar Upazila Dist Dhaka. Salvage amount 246627.00
|
GDP-4
|
savar
|
326725492, 326723023, 326724190
|
0.76
|
|
100
|
168.96
|
M/S AR Enterprise
|
151.34
|
15/01/2020
|
|
21/01/2021
|
100
|
149.45
|
100
|
10/10/2022
|
|
187
|
GDP-IV/DHA/SAV/WR-243
|
Improvement of Mograkanda Uttarpara- Shahab Uddin Firm to Mograkanda Hazi Ibrahim road by RCC at under Savar Upazila Dist Dhaka. Salvage amount 193967.00
|
GDP-4
|
savar
|
326725483
|
0.21
|
|
100
|
48.69
|
M/S Sikder Enterprise
|
46.26
|
19/11/2019
|
|
30/10/2020
|
100
|
46.20
|
100
|
10/10/2022
|
|
188
|
GDP-IV/DHA/SAV/WR-245
|
1. Improvement of Zirani Amtoli road- Meshen par- Digir par road by BC at Ch.00-362 m Road ID 326724239 under Savar upazila Dist Dhaka. 2. Improvement of Madertek-Ghoradia via-Noadda road by BC at Ch.00-770m Road ID 326724193 under Savar upazila Dist Dhaka. Salvage amount 1279592.00
|
GDP-4
|
savar
|
326724239, 326724193
|
1.13
|
|
100
|
97.37
|
Abdullah International Builders
|
92.50
|
24/11/2019
|
|
01/06/2020
|
100
|
91.56
|
100
|
10/10/2022
|
|
189
|
GDP-IV/DHA/SAV/WR-236.
|
Improvement of Nabinagar - Kaliakoir road Baipail Mosque to Baipail Aziz filling station road by RCC at Ch. 00-840m under Upazila Savar District Dhaka
|
GDP-4
|
savar
|
326725018
|
0.84
|
0.00
|
100
|
137.64
|
AR Enterprise
|
119.70
|
28/07/2019
|
|
08/02/2020
|
100
|
118.34
|
100
|
31/08/2020
|
|
190
|
GDP-IV/DHA/SAV/WR-249
|
1. Improvement of Charigram GPS- Mirza Golam Hafiz College road by RCC at Ch.1386-1600m Road ID 326724355 under Savar upazila Dist Dhaka. 2. Improvement of Rahimpur- Nolam Khoshaibari Bridge Pathalia Mirpur road - Rahim nolam Khoshaibari road by RCC at Ch.00-174m Road ID 326724445 under Savar upazila Dist Dhaka
|
GDP-4
|
savar
|
326724355, 326724445
|
0.39
|
|
0
|
69.96
|
Md. Abdul Based Zihadi
|
66.46
|
21/11/2019
|
|
20/04/2020
|
0
|
0.00
|
0
|
31/08/2020
|
|
191
|
GDP-IV/DHA/SAV/WR-248
|
1. Improvement of Islamnagar Bazar- Borowalia road at H/O Arju Mia Kathalbagan Monjur bari via Forhad bari road by RCC at under Savar upazila Dist Dhaka. 2. Improvement of Kurgaon Main road - Kurgaon Puranpara Mosque- H/O. Fazlul Saheb road by RCC at under Savar upazila Dist Dhaka. Salvage amount 693302.00
|
GDP-4
|
savar
|
326725486, 3326725092
|
0.61
|
|
100
|
97.76
|
M/S Safia Enterprise
|
92.87
|
24/11/2019
|
|
01/06/2020
|
100
|
91.56
|
100
|
19/08/2020
|
|
192
|
GSIDP/DHK/DW-22
|
Improvement of Anta Rakkha Kali Mondir. Union: Nayabari, Latitude: 23.6438, Longitude: 90.0471
|
GSIDP
|
dohar
|
|
|
|
|
5.00
|
M/S. Sheikh Nayan Enterprise
|
4.75
|
06/06/2018
|
|
09/08/2018
|
30
|
|
|
02/04/2019
|
|
193
|
GSIDP/DHK/DW-4
|
Improvement of Dighirpar Graveyard. Union: Boxnagar, Latitude: 23.6389, Longitude: 90.1683
|
GSIDP
|
nawabganj
|
|
|
|
|
5.00
|
Prashanta Builders
|
0.00
|
|
|
|
0
|
|
|
20/03/2019
|
|
194
|
GSIDP/DHK/DW-1
|
Improvement of Mohisida Graveyard. Union: Sholla, Latitude: 23.7430, Longitude: 90.1413
|
GSIDP
|
nawabganj
|
|
|
|
|
5.00
|
M/S. Dawan Enterprise
|
4.75
|
|
11/01/2018
|
10/10/2018
|
100
|
|
|
|
|
195
|
GSIDP/DHK/DW-2
|
Improvement of Kuthury Graveyard. Union: Joykrisnopur, Latitude: 23.6851, Longitude: 90.0506
|
GSIDP
|
nawabganj
|
|
|
|
|
5.00
|
Mehek Enterprise
|
4.75
|
|
11/06/2018
|
10/08/2018
|
100
|
|
|
|
|
196
|
GSIDP/DHK/DW-3
|
Improvement of Andarkota Graveyard. Union: Galimpur, Latitude: 23.6389, Longitude: 90.1683
|
GSIDP
|
nawabganj
|
|
|
|
|
5.00
|
M/S. Rahman Enterprise
|
4.75
|
|
04/06/2018
|
02/08/2018
|
100
|
|
|
|
|
197
|
GSIDP/DHK/DW-5
|
Improvement of Chatia Mohonpur Graveyard. Union: Agla, Latitude: 23.6073, Longitude: 90.2108
|
GSIDP
|
nawabganj
|
|
|
|
|
5.00
|
M/S. Rahman Enterprise
|
4.75
|
|
04/06/2018
|
02/08/2018
|
100
|
|
|
|
|
198
|
GSIDP/DHK/DW-6
|
Improvement of Meleng Khalpar Graveyard. Union: Koilayl, Latitude: 23.6995, Longitude: 90.2197
|
GSIDP
|
nawabganj
|
|
|
|
|
5.00
|
Dewan Enterprise
|
4.75
|
|
11/06/2018
|
10/08/2018
|
100
|
|
|
|
|
199
|
GSIDP/DHK/DW-7
|
Improvement of Sinjor Kendrio Graveyard. Union: Sholla, Latitude: 23.7219, Longitude: 90.1005
|
GSIDP
|
nawabganj
|
|
|
|
|
5.00
|
Mehek Enterprise
|
4.75
|
|
11/06/2018
|
10/10/2018
|
100
|
|
|
|
|
200
|
GSIDP/DHK/DW-8
|
Improvement of Boro Rajpara Pir Mahmudia Graveyard. Union: Kalakopa, Latitude: 23.6490, Longitude: 90.1546
|
GSIDP
|
nawabganj
|
|
|
|
|
5.00
|
M/S. Rahman Enterprise
|
4.75
|
|
04/06/2018
|
01/08/2018
|
100
|
|
|
|
|
201
|
GSIDP/DHK/DW-9
|
Improvement of Kamarkhola Graveyard. Union: Curain, Latitude: 23.6433, Longitude: 90.1976
|
GSIDP
|
nawabganj
|
|
|
|
|
10.00
|
Prashanta Builders
|
9.50
|
|
04/06/2018
|
10/08/2018
|
100
|
|
|
|
|
202
|
GSIDP/DHK/DW-10
|
Improvement of Jannatul Baki Graveyard at Laxmiprasad road side. Union: Bandura, Latitude: 23.6477, Longitude: 90.1174
|
GSIDP
|
nawabganj
|
|
|
|
|
9.71
|
M/S. Rahman Enterprise
|
9.23
|
|
27/05/2018
|
02/08/2018
|
100
|
|
|
|
|
203
|
GSIDP/DHK/DW-11
|
Improvement of Firingikanda Kabarsthan. Union: Bhakurta, Latitude: 23.7499, Longitude: 90.2606
|
GSIDP
|
savar
|
|
|
|
|
4.00
|
M/S. Ruma Enterprise
|
3.80
|
|
06/06/2018
|
04/08/2018
|
100
|
|
|
|
|
204
|
GSIDP/DHK/DW-12
|
Improvement of Aminbazar Kendrio Kabarsthan. Union: Aminbazar, Latitude: 23.7826, Longitude: 90.3284
|
GSIDP
|
savar
|
|
|
|
|
10.00
|
M/S. Ruma Enterprise
|
9.50
|
|
06/06/2018
|
04/08/2018
|
100
|
|
|
|
|
205
|
GSIDP/DHK/DW-13
|
Improvement of Jadurchar Play Ground. Union: Tetuljhora, Latitude: 23.7905, Longitude: 90.2803
|
GSIDP
|
savar
|
|
|
|
|
4.00
|
M/S. Sumon Enterprise Prop: Md. Liakat Hossain
|
3.80
|
|
17/06/2018
|
16/08/2018
|
100
|
|
|
|
|
206
|
GSIDP/DHK/DW-14
|
Improvement of Sree Sree Rammkrishno & Ponchaboti Mondir. Union: Savar Pourashava, Latitude: 23.8476, Longitude: 90.2484
|
GSIDP
|
savar
|
|
|
|
|
30.00
|
M/S. Saba Enterprise
|
28.50
|
|
07/06/2018
|
05/08/2018
|
100
|
|
|
|
|
207
|
GSIDP/DHK/DW-15
|
Improvement of Baitul Najat Talbag Kabarsthan Jame Mosque. Union: Savar Pourashava, Latitude: 23.8376, Longitude: 90.2581
|
GSIDP
|
savar
|
|
|
|
|
20.00
|
M/S. Saba Enterprise
|
19.00
|
|
07/06/2018
|
05/08/2018
|
100
|
|
|
|
|
208
|
IRIDP-2/DHK/DW-108
|
Construction of 90.00m Long RCC Girder Bridge Over Bangshi River on Kantahati GPS to Norshingpur Pucca Road via Paragram Road at ch. 2250m.
|
IRIDP-2
|
dhamrai
|
326144085
|
|
90.00
|
|
390.29
|
Purakaushal Projukti Ltd
|
390.29
|
08/12/2016
|
|
30/06/2018
|
100
|
|
|
25/04/2019
|
|
209
|
IRIDP-2/DHK/DW-141
|
Improvement of RHD (Radio office) to Khatra via Kulla UP Office Road from Ch. 00-1000m.
|
IRIDP-2
|
dhamrai
|
326144069
|
1.00
|
|
|
63.62
|
M/S. Era Trade International
|
60.44
|
12/08/2018
|
|
10/02/2016
|
100
|
|
|
25/04/2019
|
|
210
|
IRIDP-2/DHK/DW-154
|
a) Improvement of Dhaka Aricha NHW at Sutipara Bus stand (Boratia) to Dhantara GC Road from Ch. 8000-9600m.b) Construction of 01 no 1x4.00x4.00m culvert at ch.9260m on the same road.
|
IRIDP-2
|
dhamrai
|
326142023
|
1.60
|
4.00
|
|
114.38
|
AR Enterprise
|
102.94
|
14/05/2017
|
|
29/05/2018
|
100
|
|
|
25/04/2019
|
|
211
|
IRIDP-2/DHK/DW-189
|
Improvement of Azahar Ali Chairmans house to Kaithamara GPS Road from (Ch.800-1950m)
|
IRIDP-2
|
dhamrai
|
326145149
|
1.15
|
|
|
71.06
|
AR Enterprise
|
63.95
|
21/09/2017
|
|
28/05/2018
|
100
|
|
|
25/04/2019
|
|
212
|
IRIDP-2/DHK/DW-213
|
Improvement of Nannar-kalidas Potty Road frpm Ch. 00-1500m.
|
IRIDP-2
|
dhamrai
|
326145020
|
1.50
|
|
|
102.98
|
M/S. Ekhlas Enterprise
|
92.73
|
29/01/2018
|
|
20/01/2019
|
100
|
|
|
25/04/2019
|
|
213
|
IRIDP-2/DHK/SDW-242
|
Improvement of Sreerampur - Makarkhola Belishawar Road from Ch. 1300-2400m.
|
IRIDP-2
|
dhamrai
|
326145071
|
1.10
|
|
|
64.44
|
M/S. Kofil Enterprise
|
58.00
|
18/04/2018
|
|
20/12/2018
|
100
|
|
|
25/04/2019
|
|
214
|
IRIDP-2/DHK/DW-86
|
Improvement of Kawalipara RHD - Kushura GC Road from Ch. 1442-2212m.
|
IRIDP-2
|
dhamrai
|
326142022
|
0.77
|
|
|
49.79
|
M/S. Nizam Uddin Enterprise
|
47.30
|
19/08/2018
|
|
26/02/2019
|
75
|
|
|
25/04/2019
|
|
215
|
IRIDP-2/DHK/DW-188
|
Improvement of Kaimtara-Atimthan Khararchar Bazar Road from (Ch.3000-5000m)
|
IRIDP-2
|
dhamrai
|
326144012
|
2.00
|
|
|
123.10
|
M/S. Atik Construction, Prop: Atikur Rahman
|
110.79
|
19/09/2017
|
|
31/01/2019
|
70
|
|
|
25/04/2019
|
|
216
|
IRIDP-2/DHK/MW-106
|
Maintenance of Dhamrai GC to Shimulia GC via Kakran Bazar Road from Ch. 236-2060m.
|
IRIDP-2
|
dhamrai
|
326142013
|
|
|
|
88.67
|
1.824
|
0.00
|
|
|
|
0
|
|
|
25/04/2019
|
|
217
|
IRIDP-2/DHK/DW-45
|
Estimate for Improvement of Kantahati GPS-Norsinghopur B.C road via Paragram road from Ch. 00-2150m.
|
IRIDP-2
|
dhamrai
|
326144085
|
2.15
|
|
|
124.85
|
Padma Construction & Supplying Firm, Prop: Md. Abdus Salam Khan
|
113.46
|
04/04/2016
|
|
09/08/2016
|
100
|
|
|
24/04/2019
|
|
218
|
IRIDP-2/DHK/DW-46
|
a) Improvement of Jalsa brcick field-Durgapur Garail road from Ch. 00-2000m. ) b) Construction of 02 nos 1x4.00x4.00m culvert at 970 & 1240m on the same road.
|
IRIDP-2
|
dhamrai
|
326145055
|
2.00
|
8.00
|
|
150.83
|
M/S. Dolly Construction, Prop: Mohammad Nasir Uddin
|
128.18
|
24/03/2016
|
|
25/06/2016
|
100
|
|
|
24/04/2019
|
|
219
|
IRIDP-2/DHK/DW-47
|
a) Improvement of Hatkora Bazar to Dhaka-Aricha NHW via Deluar chairman house road from Ch. 00-1000m.b) Construction of 01 no 600mm dia pipe culvert at 920m on the same road.
|
IRIDP-2
|
dhamrai
|
326144088
|
1.00
|
0.60
|
|
67.01
|
M/S. Dolly Construction, Prop: Mohammad Nasir Uddin
|
58.40
|
24/03/2016
|
|
05/06/2018
|
100
|
|
|
24/04/2019
|
|
220
|
IRIDP-2/DHK/DW-48
|
Improvement of Haridashpur Graveyard-Amcimur Gomgram (Haridashpur to Gomgram Bazar from Ch. 1000-2000m.
|
IRIDP-2
|
dhamrai
|
326144005
|
1.00
|
|
|
61.42
|
M/S. Dolly Construction, Prop: Mohammad Nasir Uddin
|
54.98
|
24/03/2016
|
|
01/12/2016
|
100
|
|
|
24/04/2019
|
|
221
|
IRIDP-2/DHK/DW-49
|
Improvement of Chowhat Kumerpara-Paikpara High school road from Ch. 00-1000m.
|
IRIDP-2
|
dhamrai
|
326144090
|
1.00
|
|
|
62.01
|
M/S. Dolly Construction, Prop: Mohammad Nasir Uddin
|
52.65
|
24/03/2016
|
|
30/11/2017
|
100
|
|
|
24/04/2019
|
|
222
|
IRIDP-2/DHK/DW-50
|
Improvement of Doutia RHD-Goaldi Government Primary school road from Ch. 1000-1470m.
|
IRIDP-2
|
dhamrai
|
326144033
|
0.47
|
|
|
30.47
|
M/S. Dolly Construction, Prop: Mohammad Nasir Uddin
|
26.79
|
24/03/2016
|
|
09/08/2016
|
100
|
|
|
24/04/2019
|
|
223
|
IRIDP-2/DHK/DW-51
|
Improvement of Dhantara-Gojaria road from Ch. 1235-1675m. 0 Aug 2016 100
|
IRIDP-2
|
dhamrai
|
326144023
|
0.44
|
|
|
27.48
|
Padma Construction & Supplying Firm, Prop: Md. Abdus Salam Khan
|
24.98
|
04/04/2016
|
|
10/08/2016
|
100
|
|
|
24/04/2019
|
|
224
|
IRIDP-2/DHK/DW-88
|
Improvement of Sreerampur to Makokhola-Beliswar road from Ch. 500-1300m and link 250m.
|
IRIDP-2
|
dhamrai
|
326145071
|
1.05
|
|
|
67.91
|
M/S. Islam Construction, Prop: Shaleh Islam
|
59.67
|
13/04/2016
|
|
20/11/2017
|
100
|
|
|
24/04/2019
|
|
225
|
IRIDP-2/DHK/DW-89
|
Improvement of Sreerampur to Makokhola-Beliswar road from Ch. 3500-4000m.
|
IRIDP-2
|
dhamrai
|
326145071
|
0.50
|
|
|
30.29
|
M/S. Atik Construction, Prop: Atikur Rahman
|
26.79
|
13/04/2016
|
|
16/06/2016
|
100
|
|
|
24/04/2019
|
|
226
|
IRIDP-2/DHK/MW-91
|
Maintenance of Upazila H/Q to Kalampur GC road from Ch. 1165-4625m. 0
|
IRIDP-2
|
dhamrai
|
326142017
|
3.46
|
|
|
82.76
|
M/S. Jewel Engineers, Prop: Md. Abdur Rahman
|
71.77
|
16/05/2016
|
|
09/08/2016
|
100
|
|
|
24/04/2019
|
|
227
|
IRIDP-2/DHK/MW-92
|
Maintenance of Mohishasi RHD-Kushura GC road from Ch. 00-2000m.
|
IRIDP-2
|
dhamrai
|
326142018
|
2.00
|
|
|
30.58
|
M/S. Anika Enterprise Prop: Md. Anisur Rahman
|
27.45
|
24/05/2016
|
|
09/08/2016
|
100
|
|
|
24/04/2019
|
|
228
|
IRIDP-2/DHK/DW-93
|
a) Improvement of Kalampur GC to Kushura GC road from Ch. 00-2150m.b) Construction of 600mm pipe culvert at ch.1300m on the same road.
|
IRIDP-2
|
dhamrai
|
326142020
|
2.15
|
0.60
|
|
139.01
|
M/S. Islam Construction, Prop: Shaleh Islam
|
124.35
|
12/06/2016
|
|
09/08/2016
|
100
|
|
|
24/04/2019
|
|
229
|
IRIDP-2/DHK/DW-94
|
Improvement of Dhaka-Aricha road-Highway Kalampur (Dankan) to H/O Hanif road from ch. 00-310m.
|
IRIDP-2
|
dhamrai
|
326145140
|
0.31
|
|
|
19.46
|
M/S. Tushar Construction, Prop: HM Khorshed Alam
|
17.25
|
24/05/2016
|
|
31/08/2016
|
100
|
|
|
24/04/2019
|
|
230
|
IRIDP-2/DHK/DW-95
|
Improvement of Noyapara-Demran road from ch. 00-500m.
|
IRIDP-2
|
dhamrai
|
326145011
|
0.50
|
|
|
31.12
|
M/S. Kazali Enterprise, Prop: Md. Abul Hossain
|
29.54
|
10/05/2016
|
|
10/08/2016
|
100
|
|
|
24/04/2019
|
|
231
|
IRIDP-2/DHK/DW-96
|
Improvement of Chandishor Govt. Primary school to Santinogor Bazar road from ch. 1750-2500m.
|
IRIDP-2
|
dhamrai
|
326145088
|
0.75
|
|
|
44.95
|
M/S. Rubel Enterprise, Prop: Md. Maksudur Rahman
|
41.97
|
12/06/2016
|
|
10/08/2016
|
100
|
|
|
24/04/2019
|
|
232
|
IRIDP-2/DHK/DW-97
|
Improvement of Bandimara to Uttor Kelia road from ch. 3010-4200m and Link road 260m.
|
IRIDP-2
|
dhamrai
|
326144055
|
1.45
|
|
|
88.90
|
Infinity Engineering Limited Mohanmed Khorshed Alam
|
79.37
|
27/06/2016
|
|
10/08/2016
|
100
|
|
|
24/04/2019
|
|
233
|
IRIDP-2/DHK/DW-98
|
a) Improvement of Choto Kalampur Asraoyn Project-Depashai Karabil Farhader House road from Ch. 00-1300m.b) Construction of 03 nos 0.600x0.600m culvert at ch. 385,470 & 850m on the same road.
|
IRIDP-2
|
dhamrai
|
326144091
|
1.30
|
1.80
|
|
79.25
|
Imperial Consultance & Developement Ltd. Md. Sayed Shamim Reja
|
66.36
|
28/06/2016
|
|
12/05/2018
|
100
|
|
|
24/04/2019
|
|
234
|
IRIDP-2/DHK/DW-99
|
Improvement of Balitha-Dhaka Aricha RHD road from Ch. 650-1370m.
|
IRIDP-2
|
dhamrai
|
326145069
|
0.72
|
|
|
46.78
|
M/S. Jinat Enterprise, Prop: Md. Muhammad Shamsuzzaman
|
41.97
|
26/06/2016
|
|
10/08/2016
|
100
|
|
|
24/04/2019
|
|
235
|
IRIDP-2/DHK/SMW-233
|
Maintenance of Shinepukur graveyard-Srinagor Dohar road west side of Shahi Jam-e-Mosque - H/O Major General A.R Khan (Shinepukur graveyard-H/O A.R Khan- Padma college Road) from Ch.400-560m & 660-710m.
|
IRIDP-2
|
dohar
|
326184075
|
0.21
|
|
|
50.93
|
M/S H.M. HELAL ENTERPRISE
|
45.84
|
03/04/2018
|
|
06/06/2018
|
100
|
|
|
02/04/2019
|
|
236
|
IRIDP-2/DHK/SMW-234
|
Maintenance of GCCR (Battala)-Jamalchar Madrasha-Karimgonj GCCR Road from Ch. 00-350m.
|
IRIDP-2
|
dohar
|
326184047
|
0.35
|
|
|
14.46
|
M/S Asad Enterprise
|
13.01
|
01/04/2018
|
|
15/11/2018
|
100
|
|
|
02/04/2019
|
|
237
|
IRIDP-2/DHK/DW-125
|
Improvement of Mazhirchar Osman Morol House-Hazarbigha-Choto Ramnatpur Chandur Bridge Road (Mazhirchar H/O Osman Morol-H/O Eskan Member-H/O Azar Ali Molia Road Ch.00-970m.
|
IRIDP-2
|
dohar
|
326184197
|
0.97
|
|
|
53.68
|
M/S. Nusrat Traders
|
53.68
|
31/01/2017
|
|
30/08/2018
|
99
|
|
|
02/04/2019
|
|
238
|
IRIDP-2/DHK/DW-193
|
Improvement of Dohar Ghata Halipad-H/O Abu Tendal-(Sultankha Mosque) Sarengabari Mosque-H/O Aowlia Munshi Road from Ch. 40-158m.
|
IRIDP-2
|
dohar
|
326184177
|
0.12
|
|
|
28.39
|
H.M. Traders
|
27.55
|
28/11/2017
|
|
30/12/2018
|
93
|
|
|
02/04/2019
|
|
239
|
IRIDP-2/DHK/DW-24
|
Improvement of Dohar RHW H/O Hasan Chokdar (H/O Aftakazi) H/O Paran Chokdar (H/O Motalab at Village Sonarbangla)-Dohar Bazar RHW Road from ch. 00-505m.
|
IRIDP-2
|
dohar
|
326184181
|
0.51
|
|
|
27.33
|
M/S. Usha Enterprise, Prop: Md. Julhas Uddin
|
22.40
|
14/03/2016
|
|
11/07/2016
|
100
|
|
|
31/03/2019
|
|
240
|
IRIDP-2/DHK/DW-25
|
Improvement of Dohar Ghata Halipad-H/O Abu Tendal-(Sultankha Mosque) Sarengabari Mosque-H/O Aowlia Munshi Road from Ch. 00-40m and 158-850m.
|
IRIDP-2
|
dohar
|
326184177
|
0.73
|
|
|
42.32
|
M/S. Usha Enterprise, Prop: Md. Julhas Uddin
|
42.32
|
14/03/2016
|
|
08/08/2016
|
100
|
|
|
31/03/2019
|
|
241
|
IRIDP-2/DHK/MW-90
|
Maintenance of Chowdhury Bazar-Laskarkanda-Rasulpur-Nawabgonj Boarder (Chowdhury Bazar-Laskarkanda-Rasulpur to Saheb khali) road from Ch. 00-1630m.
|
IRIDP-2
|
dohar
|
326184021
|
1.63
|
|
|
44.74
|
Asian Traffic Technologies Limited Md. Engr. Mehboob Kabir
|
37.39
|
05/05/2016
|
|
08/08/2016
|
100
|
|
|
31/03/2019
|
|
242
|
IRIDP-2/DHK/DW-123
|
Improvement of Mahmudpur UP Office-Mosaraf Khan House-Munshibari Main Road (Mahmudpur H/O Selim Khan-Mahmudpur Mosque-H/O Mosharaf Khan-Bridge near H/O Dulu Khan Road) from Ch. 00-905m.
|
IRIDP-2
|
dohar
|
326184194
|
0.91
|
|
|
56.83
|
M/s. Monir Enterprise
|
50.82
|
18/01/2017
|
|
30/12/2017
|
100
|
|
|
31/03/2019
|
|
243
|
IRIDP-2/DHK/DW-124
|
a) Improvement of Char Koshi Lal Moullahr Bottola-Porankhali Bridge (Pushpakhali-Joymangal-Charkushai GC) Road from Ch. 00-1685m. b) Construction of 02 nos 0.625mx0.600m culvert at ch.280 & 1620m on the same road.
|
IRIDP-2
|
dohar
|
326184030
|
1.69
|
|
|
76.78
|
M/s. Monir Enterprise
|
68.68
|
18/01/2017
|
|
26/07/2017
|
100
|
|
|
31/03/2019
|
|
244
|
IRIDP-2/DHK/DW-190
|
Improvement of Charkushai H/O Nur Mohammad-(H/O Amana Doctor)-Dewbhog pry. School-H/O Alal-H/O-H/O Khalek H/O karim Bepary-H/O Munsur Road from Ch.00-850m.
|
IRIDP-2
|
dohar
|
326184187
|
0.85
|
|
|
46.90
|
M/S. Joyti Traders
|
46.35
|
08/01/2018
|
|
06/03/2018
|
100
|
|
|
31/03/2019
|
|
245
|
IRIDP-2/DHK/DW-191
|
Improvement of Moura Graveyard-H/O Moslem Majhi-H/O Hamed-Chatrae Bhog Road from Ch.00-685m.
|
IRIDP-2
|
dohar
|
326184130
|
0.69
|
|
|
31.53
|
M/S. Sajib Enterprise, Prop: Md. Shamsuddin Bhuiyan
|
28.37
|
29/10/2017
|
|
20/09/2018
|
100
|
|
|
31/03/2019
|
|
246
|
IRIDP-2/DHK/DW-192
|
Improvement of Shilakotha Graveyard-Eidgaon-H/O Mondal Road from Ch.00-750m.
|
IRIDP-2
|
dohar
|
326184126
|
0.75
|
|
|
42.50
|
M/S. Sheikh Enterprise
|
43.35
|
04/01/2018
|
|
07/10/2018
|
100
|
|
|
31/03/2019
|
|
247
|
IRIDP-2/DHK/DW-26
|
Improvement of Khejurbag Halimer bari to Khejurbag Primary School road from Ch. 475-680m & Link 120m.
|
IRIDP-2
|
keraniganj
|
326385166
|
0.33
|
|
|
21.96
|
M/S. Kazi Treaders, Prop: Kazi Mohammad Hossain
|
19.33
|
15/03/2016
|
|
08/08/2016
|
100
|
|
|
25/04/2019
|
|
248
|
IRIDP-2/DHK/DW-32
|
Improvement of road from Razendropur Eidgaon to Paina bazar via H/O Bodi Bhai (Freedom fighter Bodi) road from Ch 00-287m.
|
IRIDP-2
|
keraniganj
|
326385202
|
0.29
|
|
|
27.22
|
M/S. Lucky Traders, Prop: Salah Uddin Liton
|
24.22
|
14/03/2016
|
|
08/08/2016
|
100
|
|
|
08/04/2019
|
|
249
|
IRIDP-2/DHK/DW-33
|
Improvement of road from Dokkinpangaon Dewanbari pukurghat to River ghat from Ch. 00-815m.
|
IRIDP-2
|
keraniganj
|
326385195
|
0.82
|
|
|
54.84
|
M/S. Sanjeeb Enterprise, Prop: Sayed Uddin Sanjeeb
|
50.96
|
27/03/2016
|
|
23/06/2016
|
100
|
|
|
08/04/2019
|
|
250
|
IRIDP-2/DHK/DW-34
|
Improvement of Hukkapotti Zinzira Pilot School to Zinzira girls school via Masum Bekari road from Ch. 00-253m.
|
IRIDP-2
|
keraniganj
|
326385168
|
0.25
|
|
|
23.47
|
M/S. Bismillah Traders, Prop: Md. Sakur Hossain
|
21.83
|
05/04/2016
|
|
08/08/2016
|
100
|
|
|
08/04/2019
|
|
251
|
IRIDP-2/DHK/DW-35
|
Development of Zinzira-Syedpur R&H to Kuisharbag Mosque road via Amirabag School (Amirabag main road to Kuisharbag ghat road) from ch. 00-711m.
|
IRIDP-2
|
keraniganj
|
326385104
|
0.71
|
|
|
177.75
|
M/S. Israth Builders, Prop: Md. Santo Rahman
|
155.85
|
24/03/2016
|
|
30/07/2016
|
100
|
|
|
08/04/2019
|
|
252
|
IRIDP-2/DHK/DW-36
|
Improvement Work Zinzira-Konda Via Mirerbag Bazar road from Ch. 2200-2860m.
|
IRIDP-2
|
keraniganj
|
326382008
|
0.66
|
|
|
72.37
|
M/S. Kazi Treaders, Prop: Kazi Mohammad Hossain
|
64.05
|
15/03/2016
|
|
14/06/2016
|
100
|
|
|
08/04/2019
|
|
253
|
IRIDP-2/DHK/DW-137
|
Improvement of Bokterchar GPS to Khumarchar H/O Lokman Member Road from Ch. 00-750m.
|
IRIDP-2
|
keraniganj
|
326385197
|
0.75
|
|
|
90.14
|
M/S. Rashid and Brothers
|
81.31
|
12/03/2017
|
|
30/06/2017
|
100
|
|
|
08/04/2019
|
|
254
|
IRIDP-2/DHK/DW-138
|
Improvement of Bokterchar to Kondarchar Road from Ch. 1000-1850m.
|
IRIDP-2
|
keraniganj
|
326384072
|
0.85
|
|
|
51.14
|
M/S. Arshi Enterprise
|
46.03
|
16/04/2017
|
|
23/11/2017
|
100
|
|
|
08/04/2019
|
|
255
|
IRIDP-2/DHK/DW-139
|
Improvement of Standbazar Kingdom mor GCCR Road to Mollar bazar Road via Chirmanbari from Ch.00-815m.
|
IRIDP-2
|
keraniganj
|
326385524
|
0.82
|
|
|
101.10
|
M/S. Rashid and Brothers
|
90.99
|
12/03/2017
|
|
28/06/2017
|
100
|
|
|
08/04/2019
|
|
256
|
IRIDP-2/DHK/DW-156
|
Improvement of Aminpara Tota Dr. House to SP Mosque road from ch. 00-492m.
|
IRIDP-2
|
keraniganj
|
326385165
|
0.49
|
|
|
68.27
|
M/S. Ethika Enterprise, Prop: Md.Humaon Kabir
|
61.44
|
05/06/2017
|
|
18/12/2017
|
100
|
|
|
08/04/2019
|
|
257
|
IRIDP-2/DHK/DW-180
|
Improvement of Chunkutia Madapara Road (Chunkutia RHD to Kaliganj Bazar) Road from ch. 00-1200m.
|
IRIDP-2
|
keraniganj
|
326384185
|
1.20
|
|
|
332.03
|
Mars Syndicate
|
298.82
|
16/07/2017
|
|
27/07/2018
|
100
|
|
|
08/04/2019
|
|
258
|
IRIDP-2/DHK/DW-181
|
Improvement of Khajurbag kanapotti shapla nagar to Mirerbag Primary school road from ch. 00-800m.
|
IRIDP-2
|
keraniganj
|
326385218
|
0.80
|
|
|
13.33
|
M/S. Ethika Enterprise
|
11.99
|
12/07/2017
|
|
10/07/2018
|
100
|
|
|
08/04/2019
|
|
259
|
IRIDP-2/DHK/DW-182
|
Improvement of Aminpara darga to Muslim nagar via Monohori potti Road from ch. 00-500m.
|
IRIDP-2
|
keraniganj
|
326385067
|
0.50
|
|
|
79.32
|
M/S. Ethika Enterprise
|
71.39
|
12/07/2017
|
|
12/04/2018
|
100
|
|
|
08/04/2019
|
|
260
|
IRIDP-2/DHK/DW-183
|
Improvement of Kaliganj Bro majid-Santopara Road from ch. 00-840m.
|
IRIDP-2
|
keraniganj
|
326385062
|
0.84
|
|
|
151.25
|
Mars Syndicate
|
136.12
|
16/07/2017
|
|
20/07/2018
|
100
|
|
|
08/04/2019
|
|
261
|
IRIDP-2/DHK/DW-185
|
Improvement of H/O Abdullapur Korerghou Alahi Member to H/O Korban Ali Road from ch. 00-890m.
|
IRIDP-2
|
keraniganj
|
326385153
|
0.89
|
|
|
52.84
|
M/S. Ethika Enterprise
|
47.56
|
30/07/2017
|
|
21/07/2018
|
100
|
|
|
08/04/2019
|
|
262
|
IRIDP-2/DHK/DW-186
|
Improvement of Zinzira-Sydpur RHD at Parjoar GPS to Khalerghat Road via Kaitun Factory (Bondh Najorgonj H/O Moti to Khal ghat via Kanaitul factory) road from ch. 00-492m.
|
IRIDP-2
|
keraniganj
|
326385382
|
0.49
|
|
|
91.45
|
M/S. Ethika Enterprise
|
82.31
|
30/07/2017
|
|
24/01/2018
|
100
|
|
|
08/04/2019
|
|
263
|
IRIDP-2/DHK/DW-187
|
Improvement of Ayenta Bazar to Basundara river view via play ground (GCCR Road to Graveyard via play ground) Road from ch. 00-751m.
|
IRIDP-2
|
keraniganj
|
326384165
|
0.75
|
|
|
97.22
|
M/S. Rashid and Brothers
|
87.50
|
16/07/2017
|
|
22/07/2018
|
100
|
|
|
08/04/2019
|
|
264
|
IRIDP-2/DHK/SDW-235
|
Improvement of Dhaka-Mawa Road at Baghoir Bus Stand to Shargapuri Dev Mondir Road from Ch. 00 - 160m
|
IRIDP-2
|
keraniganj
|
326385485
|
0.16
|
|
|
32.04
|
M/S kazi Traders,Prop: Kazi Mohammod hossain
|
28.83
|
08/04/2018
|
|
13/10/2018
|
100
|
|
|
08/04/2019
|
|
265
|
IRIDP-2/DHK/DW-184
|
Improvement of Chunkutia Zia Nagar Road from ch. 30-798m.
|
IRIDP-2
|
keraniganj
|
326385170
|
0.77
|
|
|
84.78
|
M/S. Ethika Enterprise
|
76.30
|
30/07/2017
|
|
28/08/2018
|
100
|
|
|
08/04/2019
|
|
266
|
IRIDP-2/DHK/DW-236
|
Improvement of Mawa Road-Darigaon Bazar (Darigaon Bazar to Dhaka-Mawa Road ) Road from Ch.736-1307m.
|
IRIDP-2
|
keraniganj
|
326384126
|
0.57
|
|
|
85.79
|
M/S. Uchchol Construction
|
77.21
|
04/04/2018
|
|
01/06/2018
|
100
|
|
|
07/04/2019
|
|
267
|
IRIDP-2/DHK/DW-237
|
Improvement of Dharmasur H/O Vasani to Goalkhali Road from Ch.1350-2026m.
|
IRIDP-2
|
keraniganj
|
326385139
|
0.68
|
|
|
40.84
|
M/S Asad Enterprise
|
36.76
|
11/04/2018
|
|
16/10/2018
|
100
|
|
|
07/04/2019
|
|
268
|
IRIDP-2/DHK/DW-239
|
Improvement of Bamonsur Bridge to Rayerchar Baheyar pacca Road from Ch.00-385m.
|
IRIDP-2
|
keraniganj
|
326385335
|
0.39
|
|
|
50.08
|
M/S. Kazi Treaders, Prop: Kazi Mohammad Hossain
|
45.07
|
27/03/2018
|
|
30/09/2018
|
100
|
|
|
07/04/2019
|
|
269
|
IRIDP-2/DHK/DW-153
|
Improvement of Kamlarchar Pacca Road to Kamlarchar H/O Anwer Road from Ch.00-925m.
|
IRIDP-2
|
keraniganj
|
326385367
|
0.93
|
|
|
54.65
|
M/S. Saad Construction
|
49.19
|
18/05/2017
|
|
27/07/2018
|
100
|
|
|
07/04/2019
|
|
270
|
IRIDP-2/DHK/DW-238
|
Improvement of Subornosur Graveyard to Char Ruhitpur Road from Ch.00-1475m.
|
IRIDP-2
|
keraniganj
|
326385356
|
1.48
|
|
|
84.94
|
M/S. Basori Traders Prop: Abdul Barek
|
84.79
|
05/04/2018
|
|
10/01/2019
|
75
|
|
|
07/04/2019
|
|
271
|
IRIDP-2/DHK/DW-240
|
Improvement of Sakta Arshinagar h/o Afsar uddin Member to h/o Kari Shaheb via River Ghat from Ch.00-350m.
|
IRIDP-2
|
keraniganj
|
326385448
|
0.35
|
|
|
19.97
|
M/S Toaha Enterprise Prop: Md. Kamruzzaman Pathankanda
|
17.97
|
21/03/2018
|
|
26/09/2018
|
99
|
|
|
07/04/2019
|
|
272
|
IRIDP-2/DHK/DW-27
|
Improvement of Chunkitia Muharipatti to Muslimnagar jame Mosque road (Chumkotia Rabinacar-Khejurbas Dhaka Mawa road from Ch. 00-600m.
|
IRIDP-2
|
keraniganj
|
326385219
|
0.60
|
|
|
60.90
|
M/S. Kazi Treaders, Prop: Kazi Mohammad Hossain
|
53.88
|
05/04/2016
|
|
08/08/2016
|
100
|
|
|
07/04/2019
|
|
273
|
IRIDP-2/DHK/DW-28
|
Improvement of Char Kaligonj madrasha to h/o Helal Member via Hazi Nurul Haque shop road from Ch. 00-560m.
|
IRIDP-2
|
keraniganj
|
326385189
|
0.56
|
|
|
15.46
|
M/S. Utsho Enterprise, Prop: Mr. Sayed Uddin Sanjeeb
|
14.46
|
27/03/2016
|
|
05/05/2016
|
100
|
|
|
07/04/2019
|
|
274
|
IRIDP-2/DHK/DW-29
|
Improvement of road from Purbo Doleshwar H/O Sayed to Begunpotti from Ch. 00-320m.
|
IRIDP-2
|
keraniganj
|
326385174
|
0.32
|
|
|
24.76
|
M/S. Anika Enterprise Prop: Md. Anisur Rahman
|
22.56
|
24/05/2016
|
|
08/08/2016
|
100
|
|
|
07/04/2019
|
|
275
|
IRIDP-2/DHK/DW-30
|
Improvement of road from Purbo Zazira River ghat to Primary school road from Ch. 00-998m.
|
IRIDP-2
|
keraniganj
|
326385196
|
1.00
|
|
|
82.92
|
M/S. Ethika Enterprise, Prop: Md. Humaion Kabir
|
76.97
|
16/03/2016
|
|
22/06/2016
|
100
|
|
|
07/04/2019
|
|
276
|
IRIDP-2/DHK/DW-31
|
Improvement of road from Teghuria Baghbari to H/O Aminul Via Beara bazar road from Ch. 00-1311m.
|
IRIDP-2
|
keraniganj
|
326384071
|
1.31
|
|
|
90.21
|
M/S. Dolly Construction, Prop: Mohammad Nasir Uddin
|
80.29
|
24/03/2016
|
|
10/02/2016
|
100
|
|
|
07/04/2019
|
|
277
|
IRIDP-2/DHK/DW-55
|
Improvement of road from char Chamdoh River ghat road (Char Chamardoh) from ch. 1000-1700m.
|
IRIDP-2
|
keraniganj
|
326384003
|
0.70
|
|
|
40.08
|
M/S. Basori Traders Prop: Abdul Barek
|
37.08
|
10/03/2016
|
|
09/09/2016
|
100
|
|
|
03/04/2019
|
|
278
|
IRIDP-2/DHK/DW-57
|
Improvement of road from coto Basta-Boail-Baghasur R&H road (Boailia-Baghasur-Atharopaika) road from Ch.00-500m.
|
IRIDP-2
|
keraniganj
|
326384066
|
0.50
|
|
|
31.88
|
M/S. Shampa Construction, Prop: Mr Mohidur Rahman
|
31.88
|
09/03/2016
|
|
08/08/2016
|
100
|
|
|
03/04/2019
|
|
279
|
IRIDP-2/DHK/DW-58
|
Improvement of road from Ruhitpur Bazar to Char Ruhitpur road from Ch. 00-910m.
|
IRIDP-2
|
keraniganj
|
326385138
|
0.91
|
|
|
51.17
|
M/S. Utsho Enterprise, Prop: Mr. Sayed Uddin Sanjeeb
|
47.02
|
27/03/2016
|
|
08/08/2016
|
100
|
|
|
03/04/2019
|
|
280
|
IRIDP-2/DHK/DW-59
|
Improvement of Uttar Baher Char RHD to Borikandi Primary School road (Borikandi Rahman Member House to Uttar Baher char Pacca road) via Borikandi School road from Ch. 00-1225m.
|
IRIDP-2
|
keraniganj
|
326384153
|
1.23
|
|
|
67.70
|
M/S. Lucky Traders, Prop: Salah Uddin Liton
|
64.32
|
14/03/2016
|
|
08/08/2016
|
100
|
|
|
03/04/2019
|
|
281
|
IRIDP-2/DHK/DW-111
|
Improvement of road from telepur graveyard to H/O Younus Ali Ch.00m-223m.
|
IRIDP-2
|
keraniganj
|
326385160
|
0.22
|
|
|
21.49
|
M/S Utsho Enterprise
|
18.13
|
09/01/2017
|
|
17/05/2017
|
100
|
|
|
03/04/2019
|
|
282
|
IRIDP-2/DHK/DW-112
|
Improvement of road from Shingasur to belna Bridge road Ch.1200m-2000m.
|
IRIDP-2
|
keraniganj
|
326384142
|
0.80
|
|
|
49.01
|
M/S. Basori Traders Prop: Abdul Barek
|
42.07
|
08/01/2017
|
|
17/07/2017
|
100
|
|
|
03/04/2019
|
|
283
|
IRIDP-2/DHK/DW-143
|
Improvement of road from Purbo Horiveta (Dhaka-Bandura RHD)-Agrokhola road from at (Ch.00-1320m).
|
IRIDP-2
|
keraniganj
|
326384035
|
1.32
|
|
|
76.22
|
M/S Raj Enterprise
|
68.60
|
19/09/2017
|
|
06/02/2018
|
100
|
|
|
03/04/2019
|
|
284
|
IRIDP-2/DHK/DW-144
|
Improvement of road from Hizia Primary School to Mollabari via Purbopara mosque at (Ch.000-285m).
|
IRIDP-2
|
keraniganj
|
326385116
|
0.29
|
|
|
37.36
|
M/S. Ethika Enterprise, Prop: Md.Humaon Kabir
|
33.62
|
13/01/2017
|
|
19/12/2017
|
100
|
|
|
03/04/2019
|
|
285
|
IRIDP-2/DHK/DW-145
|
Improvement of road from Belna to Nishan Bari road at (Ch:00-2240m).
|
IRIDP-2
|
keraniganj
|
326385350
|
2.24
|
|
|
129.36
|
Mars Syndicate
|
117.00
|
08/06/2017
|
|
10/06/2018
|
100
|
|
|
03/04/2019
|
|
286
|
IRIDP-2/DHK/DW-146
|
Improvement of road from Hazratpur main road Begumabad road at (Ch: 00-940m).
|
IRIDP-2
|
keraniganj
|
326385394
|
0.94
|
|
|
54.85
|
M/s. Rubel Enterprise
|
49.37
|
03/08/2017
|
|
09/02/2018
|
100
|
|
|
03/04/2019
|
|
287
|
IRIDP-2/DHK/DW-171
|
Improvement of Kanarchar kheaghat to Kadomtoli (H/O Hilton to Riverght) road from Ch: 00m-920m.
|
IRIDP-2
|
keraniganj
|
326385046
|
0.92
|
|
|
53.12
|
M/S. Sumon Enterprise Prop: Md. Liakat Hossain
|
51.69
|
13/07/2017
|
|
02/03/2018
|
100
|
|
|
03/04/2019
|
|
288
|
IRIDP-2/DHK/DW-172
|
Improvement of Belurchar-Bounakandi road via Rasul Pur with Bituminous carpeting road from Ch: 00-1500m.
|
IRIDP-2
|
keraniganj
|
326384004
|
1.50
|
|
|
98.19
|
M/S. Israth Builders
|
88.37
|
13/07/2017
|
|
10/07/2018
|
100
|
|
|
03/04/2019
|
|
289
|
IRIDP-2/DHK/DW-52
|
Improvement of road from Khagail GPS to Kholampura GPS (Khagail School to Kholampura main road via Kholampura School road from Ch. 00-730m.
|
IRIDP-2
|
keraniganj
|
326385092
|
0.73
|
|
|
53.24
|
M/S. Usha Enterprise, Prop: Md. Julhas Uddin
|
49.46
|
27/03/2016
|
|
08/08/2016
|
100
|
|
|
02/04/2019
|
|
290
|
IRIDP-2/DHK/DW-53
|
Improvement of road from Nekrojbug Graveyard-Dhitpur-Muchiasur (Zinzira-Syedpur RHD at Nekrozbug Graveyard to Godabuj gram) road from ch. 00-500m.
|
IRIDP-2
|
keraniganj
|
326384063
|
0.50
|
|
|
39.88
|
M/S. Ethika Enterprise, Prop: Md.Humaon Kabir
|
37.05
|
15/03/2016
|
|
08/08/2016
|
100
|
|
|
02/04/2019
|
|
291
|
IRIDP-2/DHK/DW-54
|
Emergency Repair of Dhaka-Mawa RHD to Roshulpur (Ch. 00-611m) & Improvement of Same road at (Ch. 611-1700m.
|
IRIDP-2
|
keraniganj
|
326385024
|
1.70
|
|
|
65.08
|
M/S. Israth Builders, Prop: Md. Santo Rahman
|
60.27
|
06/04/2016
|
|
08/08/2016
|
100
|
|
|
02/04/2019
|
|
292
|
IRIDP-2/DHK/DW-218
|
Improvement of Vowlia (Futu mia house)-Barrah-Awona Bazar Road from Ch.400-1900m.
|
IRIDP-2
|
nawabganj
|
326624186
|
1.50
|
|
|
75.74
|
M/S Toaha Enterprise
|
68.17
|
17/01/2018
|
|
23/09/2018
|
75
|
|
|
25/04/2019
|
|
293
|
IRIDP-2/DHK/DW-56
|
Improvement of Itavara-Langkerchar road from Ch. 00-1320m.
|
IRIDP-2
|
nawabganj
|
326385141
|
1.32
|
|
|
76.11
|
Fahim Construction, Prop: Md. Kamrul Hasan
|
76.11
|
07/04/2016
|
|
05/10/2017
|
100
|
|
|
03/04/2019
|
|
294
|
IRIDP-2/DHK/DW-203
|
Improvement of Mokshedpur(Dohar)-Pollybazar-Moura bazar-Morichpatty-Kamarkhola-Churain-Benukhali(Nawabgonj) Road from ch. 3065-4650m.
|
IRIDP-2
|
nawabganj
|
326622012
|
1.59
|
|
|
82.32
|
M/S. Khosheda Enterprise, Prop: Md. Foysal Sayed Bhuiyan
|
74.09
|
30/10/2017
|
|
10/06/2018
|
100
|
|
|
02/04/2019
|
|
295
|
IRIDP-2/DHK/DW-204
|
Improvement of Dewtola Mosque-Dewtola Main road (Nayansree-Banglabazar UZR Faqure Bari-Ex. MP Harun Saheb House via Dewtola GPS Road) from ch. 00-815m.
|
IRIDP-2
|
nawabganj
|
326625052
|
0.82
|
|
|
53.00
|
M/S Raj Enterprise
|
47.70
|
30/10/2017
|
|
30/06/2018
|
100
|
|
|
02/04/2019
|
|
296
|
IRIDP-2/DHK/SDW-215
|
Improvement of Samsabad Taher member House to panalia Samaj Kallan Road from Ch.00-950m.
|
IRIDP-2
|
nawabganj
|
326624190
|
0.95
|
|
|
52.01
|
M/S. Kazi Treaders, Prop: Kazi Mohammad Hossain
|
46.81
|
16/01/2018
|
|
01/10/2018
|
100
|
|
|
02/04/2019
|
|
297
|
IRIDP-2/DHK/SDW-216
|
Improvement of Bagmara bazar-Amirpur (Amirpur Chowrasta-Char Amirpur Mosque-Rajpara) Road from Ch.00-1070m.
|
IRIDP-2
|
nawabganj
|
326624015
|
1.07
|
|
|
54.38
|
M/S. H.A.M. Traders
|
48.94
|
17/01/2018
|
|
22/09/2018
|
100
|
|
|
02/04/2019
|
|
298
|
IRIDP-2/DHK/SDW-241
|
Improvement of Shingzor Govt. Primary School - Ruparchar via Shingzor Nuria Islamia Madrasha - Khotia Shofy Dewaner (Khotia) ghat Road from Ch. 100 - 210m & 1510-2319m.
|
IRIDP-2
|
nawabganj
|
326625196
|
0.92
|
|
|
48.60
|
Md. Atiar Rahman
|
48.60
|
15/04/2018
|
|
04/10/2018
|
100
|
|
|
02/04/2019
|
|
299
|
IRIDP-2/DHK/SDW-103
|
a) Improvement of Bakshanagar UP Office-Surgonj Bazar RHD at Ferry Ghat via Dighirpar Balurchar road from Ch. 00-1000m.b) Improvement of Boxnagar-Jelypara road from Ch. 00-362m
|
IRIDP-2
|
nawabganj
|
326625208
|
1.36
|
|
|
79.90
|
Imperial Consultance & Developement Ltd. Md. Sayed Shamim Reja
|
69.71
|
16/09/2016
|
|
30/06/2018
|
80
|
|
|
02/04/2019
|
|
300
|
IRIDP-2/DHK/DW-116
|
Improvement of Jantrail U.P office-dhapari bazar-Gobindopur-Billpally-Bangla Bazar Road from Ch. 8810-10810m.
|
IRIDP-2
|
nawabganj
|
326623003
|
2.00
|
|
|
123.16
|
Swapan Trading Corporation
|
117.00
|
11/09/2018
|
|
16/09/2019
|
0
|
|
|
02/04/2019
|
|
301
|
IRIDP-2/DHK/DW-117
|
Improvement of Shikaripara UP office-Baruakhali GC via Pangiprithori Road from Ch. 315-2010m.
|
IRIDP-2
|
nawabganj
|
326623035
|
1.70
|
|
|
124.94
|
M/S. Khosheda Enterprise, Prop: Md. Foysal Sayed Bhuiyan
|
118.69
|
03/06/2018
|
|
08/06/2019
|
0
|
|
|
02/04/2019
|
|
302
|
IRIDP-2/DHK/DW-118
|
Improvement of Boxnagor UP Office-Surgonj Bazar RHD at Ferry Ghat via Digirpar Balurchar Road from Ch.1000-2526m & 3200-4000m.
|
IRIDP-2
|
nawabganj
|
326624079
|
2.33
|
|
|
131.45
|
M/S. Khosheda Enterprise, Prop: Md. Foysal Sayed Bhuiyan
|
118.30
|
12/01/2017
|
|
18/01/2018
|
90
|
|
|
02/04/2019
|
|
303
|
IRIDP-2/DHK/DW-194
|
Improvement of Nayansree Khejurbag to Kholsi More Road from Ch.00-1500m.
|
IRIDP-2
|
nawabganj
|
326625224
|
1.50
|
|
|
70.68
|
M/S. Sajib Enterprise, Prop: Md. Shamsuddin Bhuiyan
|
63.61
|
29/10/2017
|
|
30/03/2019
|
65
|
|
|
02/04/2019
|
|
304
|
IRIDP-2/DHK/DW-201
|
Improvement of Komorgonj G.C - Nawabganj UZR near Sholla UP Road (Barrah Moyan Uddin Mredha house-Chak Barrah Anower Ali House) from ch. 1000-2500m.
|
IRIDP-2
|
nawabganj
|
326624018
|
1.50
|
|
|
95.74
|
M/S. Khosheda Enterprise, Prop: Md. Foysal Sayed Bhuiyan
|
86.16
|
30/10/2017
|
|
30/05/2019
|
55
|
|
|
02/04/2019
|
|
305
|
IRIDP-2/DHK/DW-202
|
Improvement of Jantrail UP ( Jalal char) - Gasir Vita - Baishnal Bazar UZR Road from ch. 1500-3539m.
|
IRIDP-2
|
nawabganj
|
326624151
|
|
|
|
118.90
|
M/S. Khosheda Enterprise, Prop: Md. Foysal Sayed Bhuiyan
|
107.02
|
30/10/2017
|
|
30/05/2019
|
65
|
|
|
02/04/2019
|
|
306
|
IRIDP-2/DHK/SDW-214
|
Improvement of Jinzira Dohar R&H at K.P H/School-Bagmara bazar (Kolakopa RHD – Harvanga Saiful Master House-Madhobpur Mosque- Kolakopa Kokilpari) Road from Ch.00-1250m.b) Construction of 900mm dia Pipe Culvert at ch. 150m on the same road.
|
IRIDP-2
|
nawabganj
|
326624059
|
1.25
|
|
|
74.57
|
|
0.00
|
|
|
|
0
|
|
|
02/04/2019
|
|
307
|
IRIDP-2/DHK/DW-21
|
Improvement of Nayonsree UP office-Tuitail Bazar-Banglabazar road from Ch. 00-3976m.
|
IRIDP-2
|
nawabganj
|
326623006
|
3.98
|
|
|
239.13
|
M/S Salim Enterprise Prop: Md. Abul Hossain
|
201.93
|
29/02/2016
|
|
11/04/2018
|
100
|
|
|
31/03/2019
|
|
308
|
IRIDP-2/DHK/DW-22
|
Improvement of gobidapur GC-Churain UNR at Rishipara-Benukhali UZR at churain GPS via Churain Girls High school road from Ch. 00-840m.
|
IRIDP-2
|
nawabganj
|
326624149
|
0.84
|
|
|
54.08
|
M/S Toaha Enterprise Prop: Md. Kamruzzaman Pathankanda
|
49.96
|
15/02/2016
|
|
08/08/2016
|
100
|
|
|
31/03/2019
|
|
309
|
IRIDP-2/DHK/DW-23
|
a) Improvement of Vangavita – Ferryghat - Nawabganj Paragramhat at Mashail Rishipara via Dignara road from Ch. 00-4020m.b) Construction of 01 no 0.300mx0.450m culvert at ch.2030m on the same road.
|
IRIDP-2
|
nawabganj
|
326624075
|
4.02
|
|
|
128.18
|
M/S. Sarmin Enterprise Prop: Md. Siraj Mia
|
115.07
|
22/03/2016
|
|
08/08/2016
|
100
|
|
|
31/03/2019
|
|
310
|
IRIDP-2/DHK/DW-119
|
Improvement of Bagmara Akhra-Jalalpur Udawan School ( Surganj pucca road-Udawan School-Ghosh bari) Road from Ch. 00-844m
|
IRIDP-2
|
nawabganj
|
326624119
|
0.84
|
|
|
78.08
|
M/S Toaha Enterprise
|
66.67
|
09/01/2017
|
|
14/09/2017
|
100
|
|
|
31/03/2019
|
|
311
|
IRIDP-2/DHK/DW-120
|
Improvement of Malikanda of Mashil-Tulshikhali UZR to Hoglagathi Modhurchar Road from Ch. 00-300m.
|
IRIDP-2
|
nawabganj
|
326624164
|
0.30
|
|
|
19.71
|
M/S Toaha Enterprise
|
16.90
|
09/01/2017
|
|
16/07/2017
|
100
|
|
|
31/03/2019
|
|
312
|
IRIDP-2/DHK/SDW-130
|
Improvement of Shikaripara college-Hagradi from Ch. 1280-2280m.
|
IRIDP-2
|
nawabganj
|
326625077
|
1.00
|
|
|
38.88
|
M/S. Asad Enterprise
|
57.83
|
31/01/2017
|
|
26/12/2017
|
100
|
|
|
31/03/2019
|
|
313
|
IRIDP-2/DHK/DW-195
|
Improvement of Dewtola Graveyard-Gollah Gobindopur Bazar road from Ch.1000-1500m.
|
IRIDP-2
|
nawabganj
|
326624009
|
0.50
|
|
|
28.15
|
M/S Toaha Enterprise
|
25.34
|
18/10/2017
|
|
20/04/2018
|
100
|
|
|
31/03/2019
|
|
314
|
IRIDP-2/DHK/DW-196
|
Improvement of Boxnagor U.P Office - Surgonj Bazar RHD at Ferry Ghat via Digirpar Balurchar road from Ch.1355-1729m & 2710-2836m.
|
IRIDP-2
|
nawabganj
|
326624079
|
0.50
|
|
|
29.31
|
M/S. Zaman Enterprese
|
27.85
|
20/05/2018
|
|
25/10/2018
|
100
|
|
|
31/03/2019
|
|
315
|
IRIDP-2/DHK/DW-198
|
Improvement of Balenga Bazar-Kantartec Battala Road from Ch.00-800m
|
IRIDP-2
|
nawabganj
|
326625219
|
0.80
|
|
|
43.66
|
M/S Toaha Enterprise
|
39.30
|
11/03/2018
|
|
18/09/2018
|
100
|
|
|
31/03/2019
|
|
316
|
IRIDP-2/DHK/DW-199
|
Improvement of Mokim Sheikher Jola to Mahmudia Mosque Road from ch. 00-400m.
|
IRIDP-2
|
nawabganj
|
326625223
|
0.40
|
|
|
29.63
|
M/S Toaha Enterprise
|
26.66
|
18/10/2017
|
|
24/04/2018
|
100
|
|
|
31/03/2019
|
|
317
|
IRIDP-2/DHK/DW-200
|
Improvement of Durgapur village Horithakur Ghat - Ruhul Amin house Road (Durgapur main Road House of Bazlu Kazi road) from ch. 00-600m.
|
IRIDP-2
|
nawabganj
|
326625150
|
0.60
|
|
|
28.67
|
M/S Toaha Enterprise
|
25.80
|
18/10/2017
|
|
22/04/2018
|
100
|
|
|
31/03/2019
|
|
318
|
IRIDP-2/DHK/DW-40
|
Improvement of Bagsatra Shohid Shop-Rob’s House road from Ch. 00-345m.
|
IRIDP-2
|
savar
|
326725341
|
0.35
|
|
|
26.24
|
M/S. M S A Constrution & Engineering, Prop: Md. Mokhlesur Rahman
|
25.74
|
07/04/2016
|
|
09/08/2016
|
100
|
|
|
25/04/2019
|
|
319
|
IRIDP-2/DHK/DW-13
|
Improvement of Dendabor (PBS)-Corapir Mazar road from Ch. 00-2013m.
|
IRIDP-2
|
savar
|
326724199
|
2.01
|
|
|
147.90
|
M/S. M.B Traders, Prop: Md.Masudur Rahman Khan
|
132.84
|
16/03/2016
|
|
09/08/2016
|
100
|
|
|
24/04/2019
|
|
320
|
IRIDP-2/DHK/DW-14
|
a) Improvement of Balivadra GC-Dhamsona UP-Shimulia UP road from Ch. 3179-4044m.b) Construction of 01 no 0.900mx1.000m culvert at ch.3537m on the same road.
|
IRIDP-2
|
savar
|
326723025
|
0.87
|
0.90
|
|
63.57
|
M/S. M.B Traders, Prop: Md.Masudur Rahman Khan
|
56.23
|
16/03/2016
|
|
10/08/2016
|
100
|
|
|
24/04/2019
|
|
321
|
IRIDP-2/DHK/DW-15
|
Improvement of Jahangir Nagar Bhashani Hall-Dakshin Shindhuria Road from Ch. 500-1500m.
|
IRIDP-2
|
savar
|
326724003
|
1.00
|
|
|
57.30
|
M/S. Shahjahan Traders Prop: Mr. Shawkat Hossain
|
52.85
|
09/03/2016
|
|
20/01/2017
|
100
|
|
|
24/04/2019
|
|
322
|
IRIDP-2/DHK/DW-254
|
Improvement of Beltoli Pond Sobam mia house-Shingashar GPS-Beltoli (Beltoli Gravies Pond -H/O Soban MUP via Zia Kanon Baitul Mosque) Road from Ch.00-450m.
|
IRIDP-2
|
savar
|
326725360
|
0.45
|
|
|
72.54
|
Promixco Limited
|
68.92
|
27/08/2019
|
|
18/04/2019
|
99
|
|
|
24/04/2019
|
|
323
|
IRIDP-2/DHK/DW-16
|
a) Improvement of Dhaka-Aricha Highway-(Savar Bus Stand)-Kolma Bazar via Savr UP road from Ch. 2900-3038m & Ch. 3314-4213m.b) Construction of 01 no 0.900mx1.000m culvert at ch.3794m on the same road.
|
IRIDP-2
|
savar
|
326723029
|
1.04
|
0.90
|
|
73.62
|
M/S. Shahjahan Traders Prop: Mr. Shawkat Hossain
|
66.95
|
09/03/2016
|
|
09/08/2016
|
100
|
|
|
24/04/2019
|
|
324
|
IRIDP-2/DHK/DW-17
|
Improvement of Kazipara-Shadhapur Primary School road from Ch. 00-900m.
|
IRIDP-2
|
savar
|
326724065
|
0.90
|
|
|
51.10
|
M/S. Boishakhi Enterprise
|
49.54
|
13/03/2016
|
|
09/08/2016
|
100
|
|
|
24/04/2019
|
|
325
|
IRIDP-2/DHK/DW-18
|
Improvement of Ashulia UP-Katgora Bazar via Baro Rangamatia road from Ch. 3065-3600m.
|
IRIDP-2
|
savar
|
326723010
|
0.54
|
|
|
30.55
|
M/S. Boishakhi Enterprise
|
28.84
|
13/03/2016
|
|
09/08/2016
|
100
|
|
|
24/04/2019
|
|
326
|
IRIDP-2/DHK/DW-19
|
Improvement of Nabinagar-Kaliakoir RHD-Kabirpur Dewanpara road from Ch. 610-1360m & Link-44.00m.
|
IRIDP-2
|
savar
|
326724241
|
0.79
|
|
|
45.28
|
M/S. Boishakhi Enterprise
|
43.82
|
13/03/2016
|
|
09/08/2016
|
100
|
|
|
24/04/2019
|
|
327
|
IRIDP-2/DHK/DW-20
|
Improvement of Polli Janoni-Abdul Mannan Collage road from Ch. 788-1370m.
|
IRIDP-2
|
savar
|
326724103
|
0.58
|
|
|
33.19
|
M/S. Tangid Traders, Prop: Md. Abdul Awal
|
33.01
|
22/03/2016
|
|
31/01/2018
|
100
|
|
|
24/04/2019
|
|
328
|
IRIDP-2/DHK/DW-78
|
a) Improvement of Dendabor Purbopara Yeakub Sarkar House road from Ch. 00-708m & Link 135m.b) Construction of 01 no 0.900mx1.00m culvert at ch.280m on the same road.
|
IRIDP-2
|
savar
|
326725125
|
0.84
|
0.90
|
|
37.08
|
M/S Dwen Enterprise Prop: Md. Dewan Habibur Rahman
|
33.28
|
28/04/2016
|
|
09/08/2016
|
100
|
|
|
24/04/2019
|
|
329
|
IRIDP-2/DHK/DW-79
|
Improvement Chitrashail twin Tower-Kathaltola Firoz Kabir House road from Ch. 00-800m.
|
IRIDP-2
|
savar
|
326724311
|
0.80
|
|
|
45.79
|
M/S. Hanif Enterprise, Prop: Md. Hanif Sheikh
|
46.65
|
03/05/2016
|
|
20/09/2017
|
100
|
|
|
24/04/2019
|
|
330
|
IRIDP-2/DHK/DW-80
|
Improvement Dhanaid Yousuf Market-Sharker Market via Gorat road from Ch. 1700-2515m.
|
IRIDP-2
|
savar
|
326724203
|
0.82
|
|
|
104.39
|
M/S. Kofil Enterprise, Prop: Md. Mosaraf Hossain
|
97.79
|
18/04/2016
|
|
09/08/2016
|
100
|
|
|
24/04/2019
|
|
331
|
IRIDP-2/DHK/DW-81
|
Improvement Zinjira Abbase house-Miton road via Fileria Hospital from Ch. 165-1500m.
|
IRIDP-2
|
savar
|
326724066
|
1.34
|
|
|
27.12
|
M/S. Hawlader Enterprise & Supply, Prop: Md. Abdul Hannan
|
27.10
|
22/05/2016
|
|
09/08/2016
|
100
|
|
|
24/04/2019
|
|
332
|
IRIDP-2/DHK/DW-100
|
Improvement of Dendabor Kafil Uddin House-Gazirchot Bottola via Kaborsthan road from Ch. 00-1110m.
|
IRIDP-2
|
savar
|
326724055
|
1.11
|
|
|
152.65
|
Kingdom Builders Limited Md. Nusrot Hossan
|
135.77
|
27/06/2016
|
|
09/08/2016
|
100
|
|
|
24/04/2019
|
|
333
|
IRIDP-2/DHK/DW-136
|
Improvement of Anwar Jung (Anarkoli)-Kuturia Road from Ch. 00-1750m.
|
IRIDP-2
|
savar
|
326724081
|
1.75
|
|
|
99.61
|
M/s. Rubel Enterprise
|
99.61
|
09/04/2017
|
|
15/04/2017
|
100
|
|
|
24/04/2019
|
|
334
|
IRIDP-2/DHK/SDW-155
|
Improvement of Dhanaid Yousuf Market-Tajpur Road from Ch.500-1040m. 0 0 0 3,805,326.89
05 Jun 2017
3,509,999.89 30 Dec 2018 24 Dec 2018 100
|
IRIDP-2
|
savar
|
326724173
|
0.54
|
|
|
38.05
|
M/S. Gazi Construction
|
35.09
|
05/06/2017
|
|
24/12/2018
|
100
|
|
|
24/04/2019
|
|
335
|
IRIDP-2/DHK/DW-211
|
Improvement of Nabinagar- Kaliakoir RHD (Sambar filling Station)-Kaichabari Road from Ch. 00-450m.
|
IRIDP-2
|
savar
|
326724288
|
0.45
|
|
|
59.69
|
M/s. Rubel Enterprise
|
53.72
|
30/11/2017
|
|
07/05/2018
|
100
|
|
|
24/04/2019
|
|
336
|
IRIDP-2/DHK/DW-212
|
Improvement of Gonakbari (Pucca Road) - DEPZ Road from Ch. 00-430m.
|
IRIDP-2
|
savar
|
326725235
|
0.43
|
|
|
59.98
|
M/s. Rubel Enterprise
|
53.98
|
30/11/2017
|
|
04/04/2018
|
100
|
|
|
24/04/2019
|
|
337
|
IRIDP-2/DHK/DW-220
|
Improvement of Dhaka - Aaricha H. way at Niribili housing - Enaetpur Road from Ch. 00-450m.
|
IRIDP-2
|
savar
|
326724343
|
0.45
|
|
|
61.04
|
M/S. Uchchal Construction
|
54.93
|
16/01/2018
|
|
28/03/2018
|
100
|
|
|
24/04/2019
|
|
338
|
IRIDP-2/DHK/DW-221
|
Improvement of OISCA - Norshingpur Bus stand via Bottola Road from Ch. 00-625m.
|
IRIDP-2
|
savar
|
326724077
|
0.63
|
|
|
75.98
|
AR Enterprise
|
68.38
|
31/01/2018
|
|
14/06/2018
|
100
|
|
|
24/04/2019
|
|
339
|
IRIDP-2/DHK/DW-223
|
Improvement of Ambagan-Islam Nagar-Bottola-Gerua Bazar Road from Ch. 1800-2425m. 0 0 0 3,881,297.98
07 Feb 2018
3,493,168.18 14 Aug 2018 29 Feb 2020 100
|
IRIDP-2
|
savar
|
326724192
|
0.63
|
|
|
38.81
|
AR Enterprise
|
34.93
|
07/02/2018
|
|
29/02/2020
|
100
|
|
|
24/04/2019
|
|
340
|
IRIDP-2/DHK/DW-225
|
Improvement of Zamgora chowrasta to Gajirchat High School Road from Ch. 00-700m.
|
IRIDP-2
|
savar
|
326724183
|
0.70
|
|
|
111.06
|
M/S. Khosheda Enterprise, Prop: Md. Foysal Sayed Bhuiyan
|
99.96
|
14/02/2018
|
|
19/02/2019
|
100
|
|
|
24/04/2019
|
|
341
|
IRIDP-2/DHK/DW-226
|
Improvement of Narshigpur Sharmin garments - Chitrashail Akib garments via Beron Shimultola Road from Ch. 1000-1276m & 1306-1610m.
|
IRIDP-2
|
savar
|
326725028
|
0.58
|
|
|
35.05
|
M/S. Tangid Traders, Prop: Md. Abdul Awal
|
34.92
|
07/02/2018
|
|
25/10/2018
|
100
|
|
|
24/04/2019
|
|
342
|
IRIDP-2/DHK/DW-227
|
Improvement of Beron Tetul tola - Chirashail Road from Ch. 00-450m.
|
IRIDP-2
|
savar
|
326725328
|
0.45
|
|
|
27.52
|
AR Enterprise
|
24.77
|
27/02/2018
|
|
13/09/2018
|
100
|
|
|
24/04/2019
|
|
343
|
IRIDP-2/DHK/SDW-43
|
Improvement of Beraid Baharullah house-Bangla Vision Chenel Plote Road from ch. 00-300m.
|
IRIDP-2
|
savar
|
326725491
|
0.30
|
|
|
19.53
|
M/S. Wadud Enterprise
|
18.56
|
26/02/2019
|
|
05/09/2019
|
10
|
|
|
24/04/2019
|
|
344
|
IRIDP-2/DHK/SDW-44
|
Improvement of Joynabari Golden Bangla School and College-Razaghat Village Road Ch. 00-250m.
|
IRIDP-2
|
savar
|
326725494
|
0.25
|
|
|
16.80
|
M/S. Polash Construction
|
15.96
|
25/02/2019
|
|
01/08/2019
|
20
|
|
|
24/04/2019
|
|
345
|
IRIDP-2/DHK/SDW-109
|
Improvement of Niribili-Kurgaon Bazar Road from Ch. 00-850m 0 0 0 4,817,503.20 24 Nov 2016 4,817,503.20 31 Jul 2017 50
|
IRIDP-2
|
savar
|
326725197
|
0.85
|
|
|
48.17
|
M/S. Boishakhi Enterprise
|
48.17
|
24/11/2016
|
|
31/07/2017
|
50
|
|
|
24/04/2019
|
|
346
|
IRIDP-2/DHK/DW-219
|
Improvement of Bishmile Zirabo road at Ratul garments - DEPZ at Bottola Road from Ch. 00-1367m.
|
IRIDP-2
|
savar
|
326724336
|
1.37
|
|
|
185.55
|
M/S. Mallik Enterprise
|
167.00
|
31/01/2018
|
|
05/02/2019
|
70
|
|
|
24/04/2019
|
|
347
|
IRIDP-2/DHK/DW-222
|
Improvement of Gorat-Sarker market Road To Banglabazar - Gomail School Road from Ch. 600-1500m.
|
IRIDP-2
|
savar
|
326724246
|
0.90
|
|
|
48.33
|
Forkan Ahmde Khan Co. LTD.
|
48.24
|
31/01/2018
|
|
05/06/2018
|
40
|
|
|
24/04/2019
|
|
348
|
IRIDP-2/DHK/DW-224
|
Improvement of Fulbaria Bus Stand Bazar-Bongaon UP (Konda Bazar) via Balighata Road from Ch. 4500-5450m.
|
IRIDP-2
|
savar
|
326723014
|
0.95
|
|
|
114.71
|
M/S. Khosheda Enterprise, Prop: Md. Foysal Sayed Bhuiyan
|
103.24
|
11/03/2018
|
|
16/03/2019
|
55
|
|
|
24/04/2019
|
|
349
|
IRIDP-2/DHK/DW-228
|
Improvement of Narshinghapur-Kashimpur Road at Gumail culvert - Diakhali GPS Road from Ch. 00-800m.
|
IRIDP-2
|
savar
|
326725043
|
0.80
|
|
|
50.39
|
M/S. Zaman Enterprese
|
47.87
|
20/08/2018
|
|
17/03/2019
|
85
|
|
|
24/04/2019
|
|
350
|
IRIDP-2/DHK/DW-229
|
Improvement of Nabi textile Mill (Nabinagar-Kaliakoir RHD)-Koltasuti-Barol Kaborasthan via PM Hospital Road from Ch. 2000-2700m.
|
IRIDP-2
|
savar
|
326724259
|
0.70
|
|
|
39.48
|
M/S Cosmo Construction
|
35.53
|
10/04/2018
|
|
30/12/2018
|
80
|
|
|
24/04/2019
|
|
351
|
IRIDP-2/DHK/MW-230
|
Maintenance of Anoarjung Road (Anarkoli)- Kuturia Road from Ch. 3600-4600m.
|
IRIDP-2
|
savar
|
326724081
|
1.00
|
|
|
35.31
|
M/s. Rubel Enterprise
|
31.77
|
25/08/2018
|
|
|
0
|
|
|
24/04/2019
|
|
352
|
IRIDP-2/DHK/MW-231
|
Maintenance of Kalma no-1 - Belma Dairy Farm boundary wall Road from Ch. 800-2285m.
|
IRIDP-2
|
savar
|
326724017
|
1.49
|
|
|
47.63
|
M/s. Rubel Enterprise
|
42.87
|
18/02/2018
|
|
25/08/2018
|
0
|
|
|
24/04/2019
|
|
353
|
IRIDP-2/DHK/DW-255
|
Improvement of Bongaon UP office-Pujaghata Road from Ch.00-350m.
|
IRIDP-2
|
savar
|
326724128
|
0.35
|
|
|
55.17
|
Promixco Limited
|
52.41
|
27/08/2018
|
|
18/02/2019
|
70
|
|
|
24/04/2019
|
|
354
|
IRIDP-2/DHK/DW-256
|
a) Improvement of Beraid Primary school-Pujaghata Road from Ch.00-757m.b) Construction of 04 no 1.00x1.00m culvert at ch.60,90,137 & 210 m on the same road.
|
IRIDP-2
|
savar
|
326724064
|
0.76
|
4.00
|
|
62.66
|
M/S. Nizam Uddin Enterprise
|
59.53
|
19/08/2018
|
|
18/03/2019
|
60
|
|
|
24/04/2019
|
|
355
|
IRIDP-2/DHK/SDW-257
|
a) Improvement of shandip pry. School-Shandip Vill Road from Ch. 00-645m.b) Construction of 0.600x0.600m culvert at ch.03m on the same road.
|
IRIDP-2
|
savar
|
326725037
|
0.65
|
0.60
|
|
47.93
|
Gathuni
|
45.53
|
10/10/2018
|
|
03/04/2019
|
30
|
|
|
24/04/2019
|
|
356
|
IRIDP-2/DHK/DW-248
|
Improvement of Kaundia H/O. Atikur Rahman Chairman- H/O Bablu Mia-Shadubari-Khal (Sadarbari-Kaundia via Nayabazar) Road from Ch.00-260m.
|
IRIDP-2
|
savar
|
326724145
|
0.26
|
|
|
57.63
|
M/S. Sumon Enterprise Prop: Md. Liakat Hossain
|
54.75
|
29/08/2018
|
|
08/01/2019
|
100
|
|
|
18/04/2019
|
|
357
|
IRIDP-2/DHK/DW-132
|
Improvement of Paharibari-Majirdia Ghat Mohonur Pond Road from Ch. 00-385m & Link Road 165m.
|
IRIDP-2
|
savar
|
326724001
|
0.55
|
|
|
93.97
|
M/s. Rubel Enterprise
|
84.57
|
04/04/2017
|
|
11/04/2018
|
99
|
|
|
18/04/2019
|
|
358
|
IRIDP-2/DHK/DW-246
|
Improvement of Kaundia High School-Culvert-North side (Kaundia High School - Dakshik Kaundia) Road from Ch.300-1100m.
|
IRIDP-2
|
savar
|
326724350
|
0.80
|
|
|
95.22
|
M/S. Boishakhi Enterprise
|
90.45
|
16/08/2018
|
|
18/08/2019
|
99
|
|
|
18/04/2019
|
|
359
|
IRIDP-2/DHK/DW-247
|
Improvement of Kaundia Pachkani ghat – Beltoli-SI Monjur Hossain House Road from Ch.00-450m.
|
IRIDP-2
|
savar
|
326725243
|
0.45
|
|
|
76.46
|
M/S. Khosheda Enterprise, Prop: Md. Foysal Sayed Bhuiyan
|
72.64
|
30/08/2018
|
|
18/04/2019
|
10
|
|
|
18/04/2019
|
|
360
|
IRIDP-2/DHK/DW-249
|
Improvement of Kaundia School Chandpur Shop-Kashem house-Madrasha-Polash House-Wabaydullah (Kaundia School - H/O. Ali Mia - H/O.Arob Ali) Road from Ch.00-240m.
|
IRIDP-2
|
savar
|
326725173
|
0.24
|
|
|
37.11
|
M/S. Israth Builders
|
35.25
|
16/08/2018
|
|
18/02/2019
|
40
|
|
|
18/04/2019
|
|
361
|
IRIDP-2/DHK/DW-250
|
Improvement of Paschim Kaundia Ruhul Amin Hawladar house-Selim house-Master plot-Khalpar (Paschim Kaundia H/O. Salim uddin - Land of Master) Road from Ch.00-150m. 0
|
IRIDP-2
|
savar
|
326725174
|
0.15
|
|
|
29.16
|
M/S. MAZ Business Syndicate
|
27.70
|
16/08/2018
|
|
18/02/2019
|
99
|
|
|
18/04/2019
|
|
362
|
IRIDP-2/DHK/DW-251
|
Improvement of Bagshatra Monju house-Monir Hossain house Bagshatra Uttarpara Khal (Bagshatra H/O. Tayeb Ali - Bagshatra Uttarpara Ghatla) Road from Ch.00-203m. 0
|
IRIDP-2
|
savar
|
326725168
|
0.20
|
|
|
32.68
|
M/S. Mohua Enterprise
|
31.05
|
29/08/2018
|
|
03/03/2019
|
60
|
|
|
18/04/2019
|
|
363
|
IRIDP-2/DHK/DW-252
|
Improvement of Beltoli Shish mia road-Mofij Uddin house-Akter house Dewanpara Mosque (Kaundia H/O Sismia- Beltoli H/O Goyal Babu) Road from Ch.00-370m and Link 60m.
|
IRIDP-2
|
savar
|
326725361
|
0.43
|
|
|
84.54
|
M/S. Boishakhi Enterprise
|
80.31
|
16/08/2018
|
|
22/05/2018
|
80
|
|
|
18/04/2019
|
|
364
|
IRIDP-2/DHK/DW-253
|
Improvement of Koundia Melartek Mirjabari-Nayabazar Bridge-Shadurbari Ghat (Kaundia Melar tek Mirjabari-Khalil's house) Road from Ch.00-440m.
|
IRIDP-2
|
savar
|
326725057
|
0.44
|
|
|
90.29
|
M/S. Srijoni Construction
|
85.78
|
29/08/2018
|
|
18/08/2018
|
60
|
|
|
18/04/2019
|
|
365
|
IRIDP-2/DHK/DW-37
|
Improvement of Dakshin Kaundia Mosque-Burirtek road from Ch. 0.00-450m, link road-40m.
|
IRIDP-2
|
savar
|
326725054
|
0.49
|
|
|
72.38
|
M/S. Hawlader Enterprise & Supply, Prop: Md. Abdul Hannan
|
72.33
|
10/04/2016
|
|
09/08/2016
|
100
|
|
|
17/04/2019
|
|
366
|
IRIDP-2/DHK/DW-38
|
Improvement of Kaundia H/O Sismia-Beltoli H/O Goyal bari road from Ch. 00-500m.
|
IRIDP-2
|
savar
|
326725361
|
0.50
|
|
|
49.80
|
M/S. Hafiz Traders, Prop: Md. Hafizur Rahman
|
49.63
|
04/03/2016
|
|
29/06/2017
|
100
|
|
|
17/04/2019
|
|
367
|
RIDP-2/DHK/DW-39
|
Improvement of Kaundia Pachkani ghat-Beltoli road from Ch. 00-205m.
|
IRIDP-2
|
savar
|
326725243
|
0.21
|
|
|
40.58
|
M/S. Hawlader Enterprise & Supply, Prop: Md. Abdul Hannan
|
40.58
|
10/04/2016
|
|
09/08/2016
|
100
|
|
|
17/04/2019
|
|
368
|
IRIDP-2/DHK/DW-41
|
Improvement of Kaundia Bosundhara Plote (Shohel’s Shope)-Khalpar road from Ch. 00-500m.
|
IRIDP-2
|
savar
|
32672534
|
0.50
|
|
|
39.73
|
M/S. Hawlader Enterprise & Supply, Prop: Md. Abdul Hannan
|
39.72
|
10/04/2016
|
|
18/12/2016
|
100
|
|
|
17/04/2019
|
|
369
|
IRIDP-2/DHK/DW-42
|
Improvement of Melartee-Kaundia river ghat via Kaundia UP office road from Ch. 00-400m, 755-855m & 1180-1280m.
|
IRIDP-2
|
savar
|
326723006
|
0.60
|
|
|
57.36
|
M/S. Hanif Enterprise, Prop: Md. Hanif Sheikh
|
57.30
|
03/04/2016
|
|
15/12/2016
|
100
|
|
|
17/04/2019
|
|
370
|
IRIDP-2/DHK/DW-131
|
Improvement of Kaundia ghat-Pry-School Road from Ch. 00-532m.
|
IRIDP-2
|
savar
|
326723021
|
0.53
|
|
|
111.11
|
M/s. Monir Enterprise
|
99.99
|
11/04/2017
|
|
05/09/2018
|
100
|
|
|
17/04/2019
|
|
371
|
IRIDP-2/DHK/DW-133
|
Improvement of Sadarbari-Kaundia via Nayabazar Road from Ch. 00-425m.
|
IRIDP-2
|
savar
|
326724145
|
0.43
|
|
|
64.17
|
H.M. Traders
|
58.49
|
05/04/2017
|
|
12/12/2017
|
100
|
|
|
17/04/2019
|
|
372
|
IRIDP-2/DHK/DW-134
|
Improvement of Paschim Kaundia H/O. Changani River Ghat Road Ch. 00-312m & Link Road 68m.
|
IRIDP-2
|
savar
|
326725175
|
0.38
|
|
|
56.41
|
H.M. Traders
|
51.29
|
05/04/2017
|
|
01/01/2018
|
100
|
|
|
17/04/2019
|
|
373
|
IRIDP-2/DHK/DW-135
|
Improvement of H/O Mostofa Dewon-Sarbasertek Rd via Awal House from Ch. 00-236m & Link road 137m.
|
IRIDP-2
|
savar
|
326725359
|
0.37
|
|
|
68.98
|
H.M. Traders
|
62.09
|
05/04/2017
|
|
12/12/2017
|
100
|
|
|
17/04/2019
|
|
374
|
IRIDP-2/DHK/DW-206
|
Improvement of Pachkani Ghat – Kaundia UP Office Road from Ch.00-225m.
|
IRIDP-2
|
savar
|
326725052
|
0.23
|
|
|
44.82
|
Geneva International
|
40.34
|
15/11/2017
|
|
21/05/2018
|
100
|
|
|
17/04/2019
|
|
375
|
IRIDP-2/DHK/DW-207
|
Improvement of Bagshatra Eidgah Chandertek-Purbapara Turag river (Bagshatra- Chandertek) Road Ch.00-600m.
|
IRIDP-2
|
savar
|
326725053
|
0.60
|
|
|
96.95
|
H.M. Traders
|
87.25
|
10/04/2018
|
|
15/04/2019
|
100
|
|
|
17/04/2019
|
|
376
|
IRIDP-2/DHK/DW-208
|
Improvement of Ghashirdia Eidgah Ghatla - Haji Nur Mohammad house Road from Ch.00-150m.
|
IRIDP-2
|
savar
|
326725405
|
0.15
|
|
|
29.14
|
Geneva International
|
26.22
|
31/01/2018
|
|
04/06/2018
|
100
|
|
|
17/04/2019
|
|
377
|
IRIDP-2/DHK/DW-209
|
Improvement of Bagshatra Alinagar Tayeb Ali house- Turag river ghat road (Shaihid shop-Rab house-Alinagar Turag river ghat road (Shaihid shop-Rab house-Alinagar turag river ghat road) from Ch.350-500m.
|
IRIDP-2
|
savar
|
326725341
|
0.15
|
|
|
29.41
|
H.M. Traders
|
27.00
|
28/11/2017
|
|
01/04/2018
|
100
|
|
|
17/04/2019
|
|
378
|
IRIDP-2/DHK/DW-210
|
Improvement of Melartek Bazar- Kaundia Bazar via Kaundia UP office Road from Ch.400-755m.
|
IRIDP-2
|
savar
|
326723006
|
0.36
|
|
|
56.92
|
H.M. Traders
|
51.30
|
28/11/2017
|
|
30/10/2018
|
100
|
|
|
17/04/2019
|
|
379
|
IRIDP-2/DHK/DW-173
|
Improvement of road from Musurikhola Chowrasta More-South Jhawchar H/O Jalil Member (Mushuriakhola-Jhawchar Bazar road) at Ch: 00-1593.00m.
|
IRIDP-2
|
savar
|
326724074
|
1.59
|
|
|
51.89
|
M/S. Sumon Enterprise Prop: Md. Liakat Hossain
|
52.41
|
13/07/2017
|
|
09/02/2018
|
100
|
|
|
07/04/2019
|
|
380
|
IRIDP-2/DHK/DW-174
|
Improvement of road from Dhaka Aricha Kalatiapara Pucca road at Vakurta union house Ibrahim Hazi-Culvert near of Mia Chand’s house (Mograkanda uttarpara Hajibari-Bilamalia Mouza road) from Ch: 150-350m.
|
IRIDP-2
|
savar
|
326725099
|
0.20
|
|
|
82.27
|
M/S. Nowshad Enterprise
|
79.99
|
15/11/2017
|
|
01/04/2018
|
100
|
|
|
07/04/2019
|
|
381
|
IRIDP-2/DHK/DW-176
|
Improvement of Shampur Moitri Sango Field to H/O, Nazma Arifin via South Maitka (Moitri Sango Field-Samsu Miah house road) from Ch: 200-1100m.
|
IRIDP-2
|
savar
|
326724273
|
0.90
|
|
|
113.43
|
M/S. Fazlur Rahaman
|
102.08
|
19/07/2017
|
|
25/03/2018
|
100
|
|
|
07/04/2019
|
|
382
|
IRIDP-2/DHK/DW-177
|
Improvement of road from Jhowchar Bazar to 3rd gate of Bisic (Jhowchar village road) from Ch: 00-744m.
|
IRIDP-2
|
savar
|
326724024
|
0.74
|
|
|
105.97
|
M/S. Sumon Enterprise Prop: Md. Liakat Hossain
|
95.36
|
13/07/2017
|
|
05/03/2018
|
100
|
|
|
07/04/2019
|
|
383
|
IRIDP-2/DHK/DW-178
|
Improvement of Dhaka-Aricha RHD at Hemayetpur village road (Hemayetpur-chandulia road via Madrasha) from Ch: 00-475m. Link: 120m
|
IRIDP-2
|
savar
|
326725075
|
0.60
|
|
|
99.75
|
AR Enterprise
|
89.77
|
09/07/2017
|
|
25/03/2018
|
100
|
|
|
07/04/2019
|
|
384
|
IRIDP-2/DHK/DW-179
|
Improvement of road from H/O, Anwar Engineer at Rajaghat to Khatrapara Madrasha (Fulbaria Bus Stand Bazar-Bongaon UP (Kondabazar) via Balighata from ch. 940-1175m, Link road: 185m.
|
IRIDP-2
|
savar
|
326723014
|
0.42
|
|
|
72.01
|
AR Enterprise
|
64.80
|
25/02/2018
|
|
27/09/2018
|
100
|
|
|
07/04/2019
|
|
385
|
IRIDP-2/DHK/DW-148
|
Improvement of road from Firingikanda Bazar-Nonderkhmar & Chunarchar Kheaghat via Ansar Fakir’s Mazar road (Baherchar Bazar-Chunarchar-Firingikanda Cilinic road) at (Ch: 00-2175.00m).
|
IRIDP-2
|
savar
|
326724076
|
2.18
|
|
|
77.74
|
Marzi Enterprise
|
69.96
|
04/09/2017
|
|
11/05/2018
|
65
|
|
|
07/04/2019
|
|
386
|
IRIDP-2/DHK/SDW-101
|
Improvement of Joinabari pucca road more-Chandulia Sugandha Housing 14no gate (RHD) Varari-Chandulia via Joinabari road from Ch. 00-772m.
|
IRIDP-2
|
savar
|
326724120
|
|
|
|
12.76
|
Imperial Consultance & Developement Ltd. Md. Sayed Shamim Reja
|
12.76
|
26/06/2016
|
|
02/04/2017
|
100
|
|
|
03/04/2019
|
|
387
|
IRIDP-2/DHK/RSDW-101
|
Improvement of Remaining Work of Joinabari pucca road more-Chandulia Sugandha Housing 14no gate (RHD) Varari-Chandulia via Joinabari road from Ch. 00-772m.
|
IRIDP-2
|
savar
|
326724120
|
0.77
|
|
|
65.50
|
M/S. Khosheda Enterprise, Prop: Md. Foysal Sayed Bhuiyan
|
58.95
|
01/01/2017
|
|
02/12/2017
|
100
|
|
|
03/04/2019
|
|
388
|
IRIDP-2/DHK/DW-102
|
Improvement of Nimertek shabuddin more-Purbahak via Mohabbat Hajir chak road from Ch. 00-270m and Link 43.00m
|
IRIDP-2
|
savar
|
326725262
|
0.31
|
|
|
22.96
|
M/S. Sumon Enterprise Prop: Md. Liakat Hossain
|
21.70
|
18/07/2016
|
|
30/05/2017
|
100
|
|
|
03/04/2019
|
|
389
|
IRIDP-2/DHK/DW-107
|
Improvement of Dhaka-Aricha RHD-Dhobaroy Road, Aminbazar Morichartek Road H/O Altaf- Dhobaroy School Road from Ch. 00-27m, 540-644m & Link120m.
|
IRIDP-2
|
savar
|
326725084
|
0.25
|
|
|
17.78
|
M/S. Failsal Enterprise
|
16.47
|
30/10/2016
|
|
17/05/2017
|
100
|
|
|
03/04/2019
|
|
390
|
IRIDP-2/DHK/DW-147
|
Improvement of road from South Shampur Tetuljihora union & Vakurta union Connection road-Harulia-Shachib Bar (Shampur-Haruil road) at (Ch: 00-1585m).
|
IRIDP-2
|
savar
|
326724227
|
1.59
|
|
|
54.12
|
Unison Trade International
|
48.71
|
12/10/2017
|
|
10/02/2018
|
100
|
|
|
03/04/2019
|
|
391
|
IRIDP-2/DHK/DW-149
|
Improvement of road from Dhaka Aricha RHD-Hizla Boro Mosque Anoar’s Godi (Dhaka Aricha RHD- Hizia Boro Mosque) road at (Ch: 00-220-00m).
|
IRIDP-2
|
savar
|
326724359
|
0.22
|
|
|
41.89
|
M/S. Asad Enterprise
|
37.82
|
26/07/2017
|
|
01/02/2018
|
100
|
|
|
03/04/2019
|
|
392
|
IRIDP-2/DHK/DW-150
|
Improvement of road from Dhaka Aricha RHD at Ibrahimpur H/O Hakim – H/O lilas (Aminbazar Bordeshi village) road at (Ch: 0.00-184m).
|
IRIDP-2
|
savar
|
326725229
|
0.18
|
|
|
18.81
|
Marzi Enterprise
|
16.93
|
23/07/2017
|
|
29/01/2018
|
100
|
|
|
03/04/2019
|
|
393
|
IRIDP-2/DHK/DW-151
|
Improvement of road from Metka Babur Ali’s Pond to South Metks Sarder Bari (South Shampur-South Mitka) road at (Ch: 00-816m).
|
IRIDP-2
|
savar
|
326724024
|
0.82
|
|
|
121.47
|
M/S. Fazlur Rahaman
|
109.32
|
13/07/2017
|
|
20/06/2018
|
100
|
|
|
03/04/2019
|
|
394
|
IRIDP-2/DHK/DW-60
|
Improvement of Kosaibari main road-Infront of Siddique member house Via Jalal member house-Rail gate road (Kosaibari main H/O Siddique house 4no. Sector Rail Gate road from ch. 00-470m.
|
IRIDP-2
|
tejgaon circle
|
326734657
|
0.47
|
|
|
92.38
|
M/S. Shovo Engineering & Builders, Prop: Md. Mannan Kabir
|
76.19
|
11/04/2016
|
|
16/06/2016
|
100
|
|
|
24/04/2019
|
|
395
|
IRIDP-2/DHK/DW-61
|
Improvement of Muktijuddha Saroni main road - West side of Udayan school Gate - North side of Mr. Ali Munshi Market via Azompur main rd. - Railgate raod from Ch.00-540m
|
IRIDP-2
|
tejgaon circle
|
326734650
|
0.54
|
|
|
115.63
|
M/S. Khosheda Enterprise, Prop: Md. Foysal Sayed Bhuiyan
|
94.74
|
17/04/2016
|
|
16/06/2016
|
100
|
|
|
24/04/2019
|
|
396
|
IRIDP-2/DHK/DW-62
|
Improvement of CNG Pump raod - south side of Hazi Billat Ali school via Gawair madrasa road (Gawair main rd.- Gawair Billat Ali High School road via Madrasa) from ch. 00-986m and Link- 212m and 71m.
|
IRIDP-2
|
tejgaon circle
|
326734656
|
1.27
|
|
|
175.47
|
M/S. Boishakhi Enterprise
|
175.54
|
03/04/2016
|
|
09/08/2016
|
100
|
|
|
24/04/2019
|
|
397
|
IRIDP-2/DHK/DW-63
|
Improvement of Azampur Mazar main road Katcha bazar super market - TIC Kolony more (Mirjakanon bari) road from ch. 00-600m. 0 0 0 7,322,125.00
11 Apr 2016
6,002,989.20 26 May 2016 26 May 2016 100
|
IRIDP-2
|
tejgaon circle
|
326734085
|
0.60
|
|
|
73.22
|
M/S. Shovo Engineering & Builders, Prop: Md. Mannan Kabir
|
60.02
|
11/04/2016
|
|
26/05/2016
|
100
|
|
|
24/04/2019
|
|
398
|
IRIDP-2/DHK/DW-64
|
Improvement of Bonrupa Houseiing-Kawlar Samsul Alam Madrasa-Nurul Islam Mollar house road from Ch. 00-185m.
|
IRIDP-2
|
tejgaon circle
|
32673460
|
0.18
|
|
|
24.71
|
M/S. Boishakhi Enterprise
|
21.68
|
18/04/2016
|
|
26/10/2016
|
100
|
|
|
24/04/2019
|
|
399
|
IRIDP-2/DHK/DW-121
|
Improvement of Dakkhin Khan UP Anawara Degree College-Askona Bazar Main Road via Ainunbagh Shahi mosque Road (Askona Prodhan Sarak-Askona Amtola) Road from Ch. 00-400m, 627-1150m & College Connecting Road 110m.
|
IRIDP-2
|
tejgaon circle
|
326733019
|
1.03
|
|
|
193.84
|
M/S. Boishakhi Enterprise
|
193.84
|
30/11/2016
|
|
06/06/2017
|
100
|
|
|
24/04/2019
|
|
400
|
IRIDP-2/DHK/DW-122
|
Hajicamp-Shovo Hotel to Prem Bagan via Dakkhin Khan Main Road (Prembagan Mor-End of Haji Razzak Ali Road) from ch. 00-675m.
|
IRIDP-2
|
tejgaon circle
|
326734579
|
0.68
|
|
|
106.99
|
M/S. Boishakhi Enterprise
|
106.99
|
30/11/2016
|
|
06/05/2017
|
100
|
|
|
24/04/2019
|
|
401
|
IRIDP-2/DHK/DW-140
|
Improvement of Pakuria Main road (Uttara 14No Sactor-Pakuria Westmatha Muktijoddha Romer House) Road from Ch. 420-1500m.
|
IRIDP-2
|
tejgaon circle
|
326734096
|
1.08
|
|
|
169.13
|
Shafique & Brothers
|
152.25
|
05/03/2017
|
|
18/10/2017
|
100
|
|
|
24/04/2019
|
|
402
|
IRIDP-2/DHK/DW-142
|
Improvement of Bounia Bazar-Kalibari Road From ch. 720-1020m.
|
IRIDP-2
|
tejgaon circle
|
326734081
|
0.30
|
|
|
34.23
|
M/s. Rubel Enterprise
|
31.15
|
26/03/2017
|
|
02/10/2017
|
100
|
|
|
24/04/2019
|
|
403
|
IRIDP-2/DHK/DW-159
|
Improvement of Kosaibari-Sekender marker-Eastside of Railline via Azampur Main road (Sekender Market-Joynal Market via Railline sode) Road from Ch.00-1350m.
|
IRIDP-2
|
tejgaon circle
|
326734658
|
1.35
|
|
|
207.49
|
M/S. Boishakhi Enterprise
|
207.48
|
28/07/2017
|
|
21/01/2018
|
100
|
|
|
24/04/2019
|
|
404
|
IRIDP-2/DHK/DW-205
|
Improvement of Kosai bari-Katchkura road (Dakhinkhan Sekandar Market Rail Gate-Katchkura Bridge) Road from Ch. 00-830m and 917-1612m.
|
IRIDP-2
|
tejgaon circle
|
326733001
|
1.53
|
|
|
397.08
|
M/S. Khosheda Enterprise, Prop: Md. Foysal Sayed Bhuiyan
|
397.08
|
23/11/2017
|
|
29/08/2018
|
100
|
|
|
24/04/2019
|
|
405
|
IRIDP-2/DHK/DW-217
|
Improvement of Kosai bari-Katchkura road (Dakhinkhan Sekandar Market Rail Gate-Katchkura Bridge) Road from Ch. 1612-1652m and 1910-3050m.
|
IRIDP-2
|
tejgaon circle
|
326733001
|
1.18
|
|
|
301.44
|
M/S. Boishakhi Enterprise
|
301.44
|
23/11/2017
|
|
29/07/2018
|
100
|
|
|
24/04/2019
|
|
406
|
RIDP-2/DHK/DW-243
|
Construction of 0.900x1.50m Service Culvert on Sekender Market-Joynal Market via Railline side road via Azampur Main road at Ch.908m
|
IRIDP-2
|
tejgaon circle
|
326734658
|
0.90
|
|
|
22.99
|
M/S. Boishakhi Enterprise
|
20.69
|
15/04/2018
|
|
31/05/2018
|
100
|
|
|
24/04/2019
|
|
407
|
IRIDP-2/DHK/SDW-258
|
Improvement of Abdullapur-moynarteck road at east side of training center to H/O Hazi hadi Buyan via H/O Jalil and Admiral Nazimuddin Road from ch. 00-1000m.
|
IRIDP-2
|
tejgaon circle
|
326734768
|
1.00
|
|
|
75.19
|
FAST BUILD
|
71.43
|
12/11/2018
|
|
17/02/2019
|
100
|
|
|
24/04/2019
|
|
408
|
IRIDP-2/DHK/SDW-259
|
a) Improvement of Katchkura UP-Mausaid Bazar Ghat Road from ch. 00-3850m.b) Improvement of Ninirtek (Moynertek) to Uzanpur launch Ghat Road from ch. 00-500m.
|
IRIDP-2
|
tejgaon circle
|
326734293
|
4.35
|
|
|
28.77
|
KSBL-ARE Joint Venture
|
24.16
|
24/02/2019
|
|
02/12/2019
|
5
|
|
|
24/04/2019
|
|
409
|
IRIDP-2/DHK/DW-1
|
Improvement from Uttar Badda Progoti Sharani-Beraid Road at. (Ch. 70-2000m.)
|
IRIDP-2
|
tejgaon circle
|
326732002
|
1.93
|
|
|
376.66
|
Navana-Geneva-JV
|
376.66
|
14/02/2016
|
|
09/08/2016
|
100
|
|
|
17/04/2019
|
|
410
|
IRIDP-2/DHK/DW-4
|
Improvement of Nandipara Faruk shaheb house to Al-Aska Jama mosjeed road from ch. 00-880m.
|
IRIDP-2
|
tejgaon circle
|
326735114
|
0.88
|
|
|
128.13
|
M/S. Mahin Enterprise, Prop: Hamida Begum
|
116.57
|
13/03/2016
|
|
09/08/2016
|
100
|
|
|
17/04/2019
|
|
411
|
IRIDP-2/DHK/DW-161
|
Improvement of road from Dakhingaon Nondipara Main road to Jamiatul-Ulum Madrasa via Mr. Kibria Mozunder house Road from ch. 00-500m.
|
IRIDP-2
|
tejgaon circle
|
326734623
|
0.50
|
|
|
85.94
|
M/S. Khosheda Enterprise, Prop: Md. Foysal Sayed Bhuiyan
|
77.34
|
05/07/2017
|
|
11/04/2018
|
95
|
|
|
17/04/2019
|
|
412
|
IRIDP-2/DHK/DW-166
|
Improvement of Trimohoni Main Road Nagdarpar to Graveyard road via Jorvita from ch. 00-120m.
|
IRIDP-2
|
tejgaon circle
|
326734102
|
0.12
|
|
|
13.07
|
M/S. Sajib Enterprise, Prop: Md. Shamsuddin Bhuiyan
|
11.76
|
05/07/2017
|
|
01/01/2018
|
100
|
|
|
17/04/2019
|
|
413
|
IRIDP-2/DHK/DW-164
|
Improvement of Trimohoni Main Road to H/O Mr. Abdul Ali via Bepari Bari from ch. 00-530m.
|
IRIDP-2
|
tejgaon circle
|
326734685
|
0.53
|
|
|
65.49
|
M/S. Sajib Enterprise, Prop: Md. Shamsuddin Bhuiyan
|
58.94
|
05/07/2017
|
|
30/05/2018
|
65
|
|
|
17/04/2019
|
|
414
|
IRIDP-2/DHK/DW-65
|
Improvement from Uttar Badda Progoti Sharani-Beraid Road at. (Ch. 2155-4500m.)
|
IRIDP-2
|
tejgaon circle
|
326732002
|
2.35
|
|
|
705.57
|
Navana-Geneva-JV
|
705.25
|
16/02/2016
|
|
09/08/2016
|
100
|
|
|
17/04/2019
|
|
415
|
IRIDP-2/DHK/DW-104
|
Improvement of Beraid Hazi Rohim Mollar Bari-Natun 100ft Road via Chinadi bridge Road from Ch. 00-180m, 541-981m and 1076-1391m.
|
IRIDP-2
|
tejgaon circle
|
326734561
|
0.94
|
|
|
102.69
|
M/S. Isha Enterprise
|
102.69
|
10/01/2017
|
|
23/12/2017
|
100
|
|
|
17/04/2019
|
|
416
|
IRIDP-2/DHK/DW-105
|
Improvement of Solmaid Khandakar Barir More-Purbapara Graveyard & Kazi Bari Road from Ch. 00-940m.
|
IRIDP-2
|
tejgaon circle
|
326734305
|
0.94
|
|
|
136.13
|
M/S. Ifad Enterprise
|
111.54
|
31/10/2016
|
|
25/06/2017
|
100
|
|
|
17/04/2019
|
|
417
|
IRIDP-2/DHK/DW-152
|
Improvement of Anandanagar Ansar Camp-Mr, Kader House Bazar & Master Bari Road from Ch. 00-420 and link 80m.
|
IRIDP-2
|
tejgaon circle
|
326735131
|
0.50
|
|
|
27.52
|
M/S. Isha Enterprise
|
27.52
|
10/07/2017
|
|
18/04/2018
|
100
|
|
|
17/04/2019
|
|
418
|
IRIDP-2/DHK/DW-158
|
Improvement of Uttar Badda Progoti Sharani-Beraid road From Ch.4500-7185m.
|
IRIDP-2
|
tejgaon circle
|
326732002
|
2.69
|
|
|
703.20
|
Geneva International
|
703.16
|
03/08/2017
|
|
30/07/2018
|
100
|
|
|
17/04/2019
|
|
419
|
IRIDP-2/DHK/SDW-232
|
Improvement of Branch Road of Adarsaw Nagar Water Pump Road from Ch. 00-450m.
|
IRIDP-2
|
tejgaon circle
|
326734045
|
0.45
|
|
|
90.51
|
M/S. Khosheda Enterprise, Prop: Md. Foysal Sayed Bhuiyan
|
81.46
|
22/02/2018
|
|
18/06/2018
|
100
|
|
|
17/04/2019
|
|
420
|
IRIDP-2/DHK/SDW-244
|
Improvement of Satarkul South side of Taltola Jame Mosque - Nodulertek Road from Ch. 65-460m & Link 30m+170m.
|
IRIDP-2
|
tejgaon circle
|
326735135
|
0.60
|
|
|
122.55
|
Proteva Enterprise
|
116.41
|
19/07/2018
|
|
24/04/2019
|
60
|
|
|
17/04/2019
|
|
421
|
IRIDP-2/DHK/SDW-245
|
Improvement Link of Satarkul South side of Taltola Jame Mosque - Nodulertek Road from Ch. 00-340m.
|
IRIDP-2
|
tejgaon circle
|
326735135
|
0.34
|
|
|
57.30
|
M/S. Boishakhi Enterprise
|
54.43
|
03/05/2018
|
|
29/11/2018
|
50
|
|
|
17/04/2019
|
|
422
|
IRIDP-2/DHK/DW-8
|
Improvement of 4 no ward Mona meya house to Fajal bapari house from ch.00-160m.
|
IRIDP-2
|
tejgaon circle
|
326735121
|
0.16
|
|
|
17.13
|
M/S. B. M. Trading, Prop: Kazi Mohammad Badrul Huda
|
15.93
|
23/02/2016
|
|
07/04/2016
|
100
|
|
|
16/04/2019
|
|
423
|
IRIDP-2/DHK/DW-9
|
Improvement of 5 no ward Main road to Mosque road from ch.00-150m.
|
IRIDP-2
|
tejgaon circle
|
326735122
|
0.15
|
|
|
9.42
|
M/S. Shovo Engineering & Builders, Prop: Md. Mannan Kabir
|
8.98
|
29/02/2016
|
|
21/06/2016
|
100
|
|
|
16/04/2019
|
|
424
|
IRIDP-2/DHK/DW-10
|
Improvement of 6 no ward Main road to Army hause(Danob goli) road from ch.00-300m.
|
IRIDP-2
|
tejgaon circle
|
326734236
|
0.30
|
|
|
24.07
|
M/S. B. M. Trading, Prop: Kazi Mohammad Badrul Huda
|
23.26
|
23/02/2016
|
|
05/05/2016
|
100
|
|
|
16/04/2019
|
|
425
|
IRIDP-2/DHK/DW-11
|
Improvement of 7 no ward kabul Hause to Latkar Majar road road from ch.00-190m.
|
IRIDP-2
|
tejgaon circle
|
IRIDP-2/DHK/DW-11
|
0.19
|
|
|
17.92
|
M/S. AR Enterprise, Prop: Md. Mofizul Islam
|
14.33
|
03/11/2016
|
|
30/03/2017
|
100
|
|
|
16/04/2019
|
|
426
|
IRIDP-2/DHK/DW-12
|
Improvement of 9 no ward Mujaffar shahab house to Jafar shahab house to Anwar shahab house road from ch.00-225m.
|
IRIDP-2
|
tejgaon circle
|
326735124
|
0.23
|
|
|
13.81
|
M/S. AR Enterprise, Prop: Md. Mofizul Islam
|
11.42
|
24/11/2016
|
|
14/03/2017
|
100
|
|
|
16/04/2019
|
|
427
|
IRIDP-2/DHK/DW-7
|
Improvement of Shakar jaiga main road to Akkas Ali Matabbar house from ch.00-310m.
|
IRIDP-2
|
tejgaon circle
|
326734687
|
0.31
|
|
|
27.01
|
M/S. Mahin Enterprise, Prop: Hamida Begum
|
23.78
|
24/03/2016
|
|
09/08/2016
|
100
|
|
|
16/04/2019
|
|
428
|
RIDP-2/DHK/DW-8
|
Improvement of 4 no ward Mona meya house to Fajal bapari house from ch.00-160m.
|
IRIDP-2
|
tejgaon circle
|
326735121
|
0.16
|
|
|
17.13
|
M/S. B. M. Trading, Prop: Kazi Mohammad Badrul Huda
|
15.93
|
23/02/2016
|
|
07/04/2016
|
100
|
|
|
16/04/2019
|
|
429
|
IRIDP-2/DHK/DW-157
|
Improvement of Nondipara Main road to Dokhingaon & 3No road (Titas Road) from Ch.00-410m.
|
IRIDP-2
|
tejgaon circle
|
326734620
|
0.41
|
|
|
77.87
|
M/S. Khosheda Enterprise, Prop: Md. Foysal Sayed Bhuiyan
|
70.08
|
13/07/2017
|
|
18/04/2018
|
100
|
|
|
16/04/2019
|
|
430
|
IRIDP-2/DHK/DW-160
|
Improvement of road from Manikdia Graveyard to Dolai Nodi Bridge (Dakkhingaon Joinobbagh-Manikdia Graveyard) Road from ch. 00-660m.
|
IRIDP-2
|
tejgaon circle
|
326734115
|
0.66
|
|
|
67.87
|
M/S. Khosheda Enterprise, Prop: Md. Foysal Sayed Bhuiyan
|
61.08
|
05/07/2017
|
|
17/12/2017
|
100
|
|
|
16/04/2019
|
|
431
|
IRIDP-2/DHK/DW-162
|
Improvement of Inner Rashidbag road (Uttar Nandipara Rasulbag Jame Mosjid-Batul Sobahan Jame Mosque) from Ch.00-670m.
|
IRIDP-2
|
tejgaon circle
|
326734436
|
0.67
|
|
|
104.70
|
M/S. Khosheda Enterprise, Prop: Md. Foysal Sayed Bhuiyan
|
94.23
|
03/07/2017
|
|
11/07/2018
|
100
|
|
|
16/04/2019
|
|
432
|
IRIDP-2/DHK/DW-163
|
Improvement of Vaikdia Bridge to Jame Mosque via H/O Mr. Rahmat Ullah from ch.00-315m.
|
IRIDP-2
|
tejgaon circle
|
326734686
|
0.32
|
|
|
31.53
|
M/S. Khosheda Enterprise, Prop: Md. Foysal Sayed Bhuiyan
|
28.38
|
05/07/2017
|
|
13/11/2017
|
100
|
|
|
16/04/2019
|
|
433
|
IRIDP-2/DHK/DW-165
|
Improvement of H/O Awal Master at 8 no. word to Nasirabad Tekpara from Ch.00-500m.
|
IRIDP-2
|
tejgaon circle
|
326734689
|
0.50
|
|
|
47.10
|
M/S. Sajib Enterprise, Prop: Md. Shamsuddin Bhuiyan
|
42.39
|
05/07/2017
|
|
30/10/2017
|
100
|
|
|
16/04/2019
|
|
434
|
IRIDP-2/DHK/DW-167
|
Improvement of Manda main road from Ch. 00-1150m.
|
IRIDP-2
|
tejgaon circle
|
326733020
|
1.15
|
|
|
110.80
|
M/S. Khosheda Enterprise, Prop: Md. Foysal Sayed Bhuiyan
|
99.72
|
05/07/2017
|
|
20/02/2018
|
100
|
|
|
16/04/2019
|
|
435
|
IRIDP-2/DHK/DW-168
|
Improvement of Manda Payer Ali road from Ch.00-330m.
|
IRIDP-2
|
tejgaon circle
|
326734237
|
0.33
|
|
|
22.88
|
M/S. Khosheda Enterprise, Prop: Md. Foysal Sayed Bhuiyan
|
20.59
|
05/07/2017
|
|
26/10/2017
|
100
|
|
|
16/04/2019
|
|
436
|
IRIDP-2/DHK/DW-169
|
Improvement of Shahibag Bottala to Begunbari Bridge (Rajarbag Kalibari - Begunbari Bridge road) from ch.690-930m.
|
IRIDP-2
|
tejgaon circle
|
326734435
|
0.24
|
|
|
59.76
|
M/S. Sajib Enterprise, Prop: Md. Shamsuddin Bhuiyan
|
53.78
|
05/07/2017
|
|
25/05/2018
|
100
|
|
|
16/04/2019
|
|
437
|
IRIDP-2/DHK/DW-2
|
Improvement of Dakkhingaon Bottla to Bagunbari to Gani Sardar mosque road from ch.00-410m.
|
IRIDP-2
|
tejgaon circle
|
326734618
|
0.41
|
|
|
41.54
|
M/S. Khosheda Enterprise, Prop: Md. Foysal Sayed Bhuiyan
|
38.21
|
25/02/2016
|
|
09/08/2016
|
100
|
|
|
10/04/2019
|
|
438
|
IRIDP-2/DHK/DW-3
|
Improvement of Nandipara Chotobottola Bridge to Jahangir shaheb House Road from ch. 00-715m and School Connecting 98.00m and Mosque Road 80.00m.
|
IRIDP-2
|
tejgaon circle
|
326734746
|
0.89
|
|
|
106.62
|
M/S. Mahin Enterprise, Prop: Hamida Begum
|
106.62
|
17/02/2016
|
|
30/12/2017
|
100
|
|
|
10/04/2019
|
|
439
|
IRIDP-2/DHK/DW-5
|
Improvement of East Nandipara Main road to Nandipara Ideal School road from ch.00-170m (link 37).
|
IRIDP-2
|
tejgaon circle
|
326735115
|
0.21
|
|
|
22.48
|
M/S. Hawlader Enterprise & Supply, Prop: Md. Abdul Hannan
|
20.21
|
11/04/2016
|
|
19/09/2016
|
100
|
|
|
10/04/2019
|
|
440
|
IRIDP-2/DHK/DW-70
|
Improvement of Matuail UP Office - Shishu Matrisadan Hospital road from Ch. 00-210m.
|
IRIDP-2
|
tejgaon circle
|
326733022
|
0.21
|
|
|
24.60
|
M/S. Sajib Enterprise, Prop: Md. Shamsuddin Bhuiyan
|
22.55
|
21/04/2016
|
|
12/05/2016
|
100
|
|
|
10/04/2019
|
|
441
|
IRIDP-2/DHK/DW-71
|
Improvement of Dogair uttar Nutunpara - Paschimpara - Hizoltala (Mazar road) Road from ch. 00-405m.
|
IRIDP-2
|
tejgaon circle
|
326735053
|
0.41
|
|
|
65.11
|
M/S. Synthia Enterprise, Prop: Md. Shahidur Rahman
|
58.41
|
20/04/2016
|
|
09/08/2016
|
100
|
|
|
10/04/2019
|
|
442
|
IRIDP-2/DHK/DW-72
|
Improvement of Matuail Muslim Nagar Main Road from Ch.0.00-250m.
|
IRIDP-2
|
tejgaon circle
|
326734196
|
0.25
|
|
|
39.05
|
M/S. Khosheda Enterprise, Prop: Md. Foysal Sayed Bhuiyan
|
35.13
|
20/04/2016
|
|
31/05/2016
|
100
|
|
|
10/04/2019
|
|
443
|
IRIDP-2/DHK/DW-73
|
Improvement of Bahir Tengra - Nimai Kashari Via Taleyb Ali Mosque road from Ch. 00-550m.
|
IRIDP-2
|
tejgaon circle
|
326734320
|
0.55
|
|
|
75.18
|
Shahidul Islam Builders Ltd. Prop: Md. Shahidul Islam
|
67.42
|
20/04/2016
|
|
09/08/2016
|
100
|
|
|
10/04/2019
|
|
444
|
IRIDP-2/DHK/DW-74
|
Improvement of Zia Shorony Islami Jame Mosque - PNP School Road from ch. 00-500m.
|
IRIDP-2
|
tejgaon circle
|
326735108
|
0.50
|
|
|
25.64
|
M/S. S. Lovelu Enterprise Prop: Mohammad Salauddin Lovelu
|
21.79
|
20/04/2016
|
|
09/08/2016
|
100
|
|
|
10/04/2019
|
|
445
|
IRIDP-2/DHK/DW-75
|
Improvement of Matuail Mogalnagar Main Road from ch. 00-350m.
|
IRIDP-2
|
tejgaon circle
|
326735096
|
0.35
|
|
|
49.37
|
M/S. Synthia Enterprise, Prop: Md. Shahidur Rahman
|
43.30
|
20/04/2016
|
|
09/08/2016
|
100
|
|
|
10/04/2019
|
|
446
|
IRIDP-2/DHK/DW-76
|
Improvement of East Shekhdi Al-hera Mosque to Shekhdi School Road from ch. 00-240m.
|
IRIDP-2
|
tejgaon circle
|
326734645
|
0.24
|
|
|
29.50
|
M/S. Khosheda Enterprise, Prop: Md. Foysal Sayed Bhuiyan
|
26.37
|
20/04/2016
|
|
30/06/2017
|
100
|
|
|
10/04/2019
|
|
447
|
IRIDP-2/DHK/MW-77
|
Maintenance of Demra Kayetpara GC road from Ch. 00-1300m.
|
IRIDP-2
|
tejgaon circle
|
326732001
|
1.30
|
|
|
38.01
|
M/S. Sajib Enterprise, Prop: Md. Shamsuddin Bhuiyan
|
33.92
|
21/04/2016
|
|
09/08/2016
|
100
|
|
|
10/04/2019
|
|
448
|
IRIDP-2/DHK/DW-110
|
Improvement of Sanarpar London Market Road-Mohakash via Uttar Sanarpar Jame Mosque Road (Bytul Maraj Jame Mosque Potuakhaly Hotel to Mohakash Khalpar Road) from Ch. 00-520m.
|
IRIDP-2
|
tejgaon circle
|
326734679
|
0.52
|
|
|
64.12
|
MR Khan Engineering
|
63.99
|
22/11/2016
|
|
28/01/2017
|
100
|
|
|
10/04/2019
|
|
449
|
IRIDP-2/DHK/DW-113
|
Improvement of Matuyal UP Office-Shishu Matrisadan Hospital Road from Ch. 210-3068m
|
IRIDP-2
|
tejgaon circle
|
326733022
|
2.86
|
|
|
417.23
|
M/S. Khosheda Enterprise, Prop: Md. Foysal Sayed Bhuiyan
|
417.21
|
17/11/2016
|
|
03/06/2017
|
100
|
|
|
10/04/2019
|
|
450
|
IRIDP-2/DHK/DW-114
|
Improvement of Matuyal Maddrasha Road from Ch. 350-2310m.
|
IRIDP-2
|
tejgaon circle
|
326734186
|
1.96
|
|
|
277.30
|
|
277.24
|
17/11/2016
|
|
31/08/2017
|
100
|
|
|
10/04/2019
|
|
451
|
IRIDP-2/DHK/DW-115
|
Improvement of Matuyal Dakhinpara via Dogair Road from Ch. 00-730m.
|
IRIDP-2
|
tejgaon circle
|
326734219
|
0.73
|
|
|
111.56
|
M/S. Synthia Enterprise, Prop: Md. Shahidur Rahman
|
111.50
|
21/11/2016
|
|
12/05/2017
|
100
|
|
|
10/04/2019
|
|
452
|
RIDP-2/DHK/DW-6
|
Improvement of Trimohoni main road to Taharia madrasa to khokon shahab house road at ch.00-610m (link 170m.)
|
IRIDP-2
|
tejgaon circle
|
326734119
|
0.78
|
|
|
81.97
|
Fahim Construction, Prop: Md. Kamrul Hasan
|
81.97
|
14/03/2016
|
|
09/08/2016
|
100
|
|
|
10/04/2019
|
|
453
|
IRIDP-2/DHK/DW-69
|
Improvement of Polashpur (Donia) north south 4 no Road from ch. 00-980m.
|
IRIDP-2
|
tejgaon circle
|
326734389
|
0.98
|
|
|
88.73
|
M/S. Zaman Traders, Prop: Md. Mohammed Nuruzzaman
|
82.37
|
20/04/2016
|
|
09/08/2016
|
100
|
|
|
09/04/2019
|
|
454
|
IRIDP-2/DHK/DW-82
|
Improvement of Shampur Ralline to Dhaka Poinishkation (Dhaka WASA) North side road from Ch. 00-500m.
|
IRIDP-2
|
tejgaon circle
|
326734558
|
0.50
|
|
|
148.44
|
Kazi & Brothers, Prop: Md. Masud Kazi
|
131.92
|
26/04/2016
|
|
09/08/2016
|
100
|
|
|
08/04/2019
|
|
455
|
IRIDP-2/DHK/DW-83
|
Improvement of Name Shampur-Front of Mr. Bashu Mia Houe road from Ch. 00-530m.
|
IRIDP-2
|
tejgaon circle
|
326734527
|
0.53
|
|
|
164.61
|
M/S. AR Enterprise, Prop: Md. Mofizul Islam
|
137.81
|
25/04/2016
|
|
09/08/2016
|
100
|
|
|
08/04/2019
|
|
456
|
IRIDP-2/DHK/DW-84
|
Improvement of H/O Mr. Piar Ali to H/O Mr. Sabuz Mia road from Ch. 00-180m.
|
IRIDP-2
|
tejgaon circle
|
326734530
|
0.18
|
|
|
56.66
|
M/S. AR Enterprise, Prop: Md. Mofizul Islam
|
47.50
|
25/04/2016
|
|
09/08/2016
|
100
|
|
|
08/04/2019
|
|
457
|
IRIDP-2/DHK/DW-85
|
Improvement of Shampur H/O Moina-Shasu shaheb road from Ch. 00-180m.
|
IRIDP-2
|
tejgaon circle
|
326734532
|
0.18
|
|
|
56.72
|
M/S. Shaque Enterprise, Prop: Md. Manwar Hossain
|
50.36
|
19/04/2016
|
|
09/08/2016
|
100
|
|
|
08/04/2019
|
|
458
|
IRIDP-2/DHK/DW-87
|
Improvement of Dhaka Narayangonj road to Dhaka Match Bazar via Dhaka Match New colony road from Ch. 450-800m.
|
IRIDP-2
|
tejgaon circle
|
326734514
|
0.35
|
|
|
100.32
|
M/S. Khosheda Enterprise, Prop: Md. Foysal Sayed Bhuiyan
|
89.92
|
20/04/2016
|
|
28/04/2017
|
100
|
|
|
08/04/2019
|
|
459
|
IRIDP-2/DHK/DW-127
|
Estimate for Improvement of Road From Marajnagar Bazar - Zia shoroni via Madrasha road from Ch.00-500m.
|
IRIDP-2
|
tejgaon circle
|
326735110
|
0.50
|
|
|
114.33
|
M/S. Saad Construction
|
93.47
|
11/01/2017
|
|
13/05/2017
|
100
|
|
|
08/04/2019
|
|
460
|
IRIDP-2/DHK/DW-128
|
Estimate for Improvement of Road From Cement shop of Sumon to WASA Board Factory (Mukti Sarani - Shampur WASA road ) from ch. 00 - 584m.
|
IRIDP-2
|
tejgaon circle
|
326735051
|
0.58
|
|
|
86.23
|
8,623,778.02 M/S. Israth Builders
|
86.23
|
01/02/2017
|
|
29/01/2018
|
100
|
|
|
08/04/2019
|
|
461
|
IRIDP-2/DHK/DW-129
|
Estimate for Improvement of Janata Bank to Rail Line Road ( Dhaka Narayaningong road to Boritola via H/O Lutfor Rahaman ) from Ch.00 - 730m.
|
IRIDP-2
|
tejgaon circle
|
326734516
|
0.73
|
|
|
65.69
|
M/S. Asad Enterprise
|
57.83
|
02/03/2017
|
|
20/06/2017
|
100
|
|
|
08/04/2019
|
|
462
|
IRIDP-2/DHK/DW-126
|
Estimate for Improvement of H/O Shajib (Corner of WASA) to Cormer of Bridge at 7no. Ward Road (Shampur Railline to Dhaka Poinishkation (Dhaka Washa) North from Ch.500-775m.
|
IRIDP-2
|
tejgaon circle
|
326734558
|
0.28
|
|
|
72.43
|
M/S. Israth Builders
|
57.80
|
01/02/2017
|
|
30/12/2017
|
35
|
|
|
08/04/2019
|
|
463
|
IRIDP-2/DHK/DW-66
|
Improvement of Matuil Madrasa road from ch.00-374m.
|
IRIDP-2
|
tejgaon circle
|
326734186
|
0.37
|
|
|
47.34
|
M/S. AR Enterprise, Prop: Md. Mofizul Islam
|
47.34
|
25/04/2016
|
|
09/08/2016
|
100
|
|
|
08/04/2019
|
|
464
|
IRIDP-2/DHK/DW-67
|
Construction of 2x2.50x3.50m Box Culvert on Dogair Poschimpara to Noapara via Rustom Ali School road at ch. 420m.
|
IRIDP-2
|
tejgaon circle
|
326734324
|
|
5.00
|
|
15.39
|
M/S. Intisar Traders, Prop: Md. Shakawat Hossain
|
15.39
|
20/04/2016
|
|
30/06/2017
|
100
|
|
|
08/04/2019
|
|
465
|
IRIDP-2/DHK/DW-68
|
Improvement of Demra Jute mill 4No gate to Demra Mala Market from Ch. 00-570m.
|
IRIDP-2
|
tejgaon circle
|
326734379
|
0.57
|
|
|
65.46
|
M/S. Khosheda Enterprise, Prop: Md. Foysal Sayed Bhuiyan
|
55.95
|
20/04/2016
|
|
29/12/2016
|
100
|
|
|
08/04/2019
|
|
466
|
IRIDP-2/DHK/DW-6
|
Improvement of Trimohoni main road to Taharia madrasa to khokon shahab house road at ch.00-610m (link 170m.)
|
IRIDP-2
|
tejgaon circle
|
|
0.61
|
|
|
81.98
|
Fahim Construction, Prop: Md. Kamrul Hasan
|
81.98
|
|
21/03/2016
|
30/11/2016
|
100
|
|
|
|
|
467
|
IRIDP-2/DHK/DW-7
|
Improvement of Shakar jaiga main road to Akkas Ali Matabbar house from ch.00-310m.
|
IRIDP-2
|
tejgaon circle
|
|
0.31
|
|
|
27.02
|
M/S. Mahin Enterprise, Prop: Hamida Begum
|
23.78
|
|
01/04/2016
|
12/06/2016
|
100
|
|
|
|
|
468
|
e-Tender/NBIDNNGPS/DHA/DOH/2018-2019/W1-02692
|
MADHUR CHAR GPS
|
NBIDNNGPS
|
dohar
|
|
|
|
|
27.02
|
Dia Construction
|
25.67
|
|
08/01/2019
|
|
0
|
|
|
|
|
469
|
e-Tender/NBIDNNGPS/DHA/DOH/2018-2019/W1-02693
|
CHARKUSHAI
|
NBIDNNGPS
|
dohar
|
|
|
|
|
79.83
|
M/S Kafil Enterprise
|
75.84
|
|
20/01/2019
|
|
0
|
|
|
|
|
470
|
e-Tender/NBIDNNGPS/DHA/DOH/2018-2019/W1-2113
|
UTTOR JOYPARA NON GOVT PRIMARY SCHOOL
|
NBIDNNGPS
|
dohar
|
|
|
|
|
91.79
|
M/S Alif Enterprise
|
87.20
|
|
08/01/2019
|
|
0
|
|
|
|
|
471
|
e-Tender/NBIDNNGPS/DHA/NAW/2017-2018/W1-00543
|
DHAKIN SHOLLA REG. NON GOVERNMENT PRIMARY SCHOOL
|
NBIDNNGPS
|
nawabganj
|
|
|
|
|
74.65
|
M/S Pattandar Enterprise
|
70.92
|
|
25/04/2018
|
30/04/2019
|
60
|
|
|
|
|
472
|
e-Tender/NBIDNNGPS/DHA/NAW/2017-2018/W1-00659
|
MOLLAH KANDA RPS
|
NBIDNNGPS
|
nawabganj
|
|
|
|
|
79.53
|
M/S Pattandar Enterprise
|
75.56
|
|
20/05/2018
|
25/05/2019
|
55
|
|
|
|
|
473
|
e-Tender/NBIDNNGPS/DHA/NAW/2017-2018/W1-00660
|
HARISHKUL REG. NON GOVERNMENT PRIMARY SCHOOL
|
NBIDNNGPS
|
nawabganj
|
|
|
|
|
50.42
|
Mehek Enterprise
|
47.90
|
|
20/05/2018
|
25/05/2019
|
65
|
|
|
|
|
474
|
e-Tender/NBIDNNGPS/DHA/NAW/2018-2019/W1-01966
|
KHAMAR KHOLA
|
NBIDNNGPS
|
nawabganj
|
|
|
|
|
72.61
|
M/S. Manjila Traders
|
68.98
|
|
28/11/2018
|
05/10/2019
|
0
|
|
|
|
|
475
|
e-Tender/NBIDNNGPS/DHA/NAW/2018-2019/W1-02274
|
DIRGOGRAM REG. NON GOVERNMENT PRIMARY SCHOOL
|
NBIDNNGPS
|
nawabganj
|
|
|
|
|
56.94
|
Rowjat Enterpride
|
54.09
|
|
23/12/2018
|
05/10/2019
|
0
|
|
|
|
|
476
|
e-Tender/NBIDNNGPS/DHA/NAW/2018-2019/W1-02275
|
RAIPUR REGISTER PRIMARY SCHOOL
|
NBIDNNGPS
|
nawabganj
|
|
|
|
|
84.68
|
M.S. Tamim Enterprise
|
80.45
|
|
23/12/2018
|
05/10/2019
|
0
|
|
|
|
|
477
|
e-Tender/NBIDNNGPS/DHA/NAW/2018-2019/W1-02276
|
PURBO PATILJHAP GOVT PRIMARY SCHOOL
|
NBIDNNGPS
|
nawabganj
|
|
|
|
|
57.68
|
M/S. Salem Enterprise
|
54.90
|
|
23/12/2018
|
05/10/2019
|
0
|
|
|
|
|
478
|
e-Tender/NBIDNNGPS/DHA/NAW/2018-2019/W1-02604
|
BHANGA BHITA GPS
|
NBIDNNGPS
|
nawabganj
|
|
|
|
|
83.54
|
M/S. H.A.M.Traders
|
79.36
|
|
10/01/2019
|
17/10/2019
|
0
|
|
|
|
|
479
|
RERMP-3/DH AKA/W-40
|
Maintenance of Rural
Roads Dhaka ()
|
RERMP-3
|
savar
|
N/A
|
|
|
36
|
2263.00
|
N/A
|
2263.00
|
|
|
|
40
|
819.00
|
36
|
26/12/2021
|
|
480
|
RTIP-II/DHA/UNR-12(a)
|
a) Dhamrai Pourasava to Savar Bazar via Mamura Road
|
RTIP-2
|
dhamrai
|
|
3.05
|
|
83
|
406.04
|
M/S.Ashik Enterprise & Nusrat Trade International [(Ashik-Nusrat (JV)]
|
352.12
|
|
14/03/2016
|
15/12/2018
|
100
|
|
83
|
08/04/2019
|
|
481
|
RTIP-II/DHA/UNR-12
|
b) Dhamrai Pourasava (Bata gate) to Jalsin bazar Road
|
RTIP-2
|
dhamrai
|
|
4.05
|
|
|
301.00
|
National Shafique & Brother (JV)
|
1005.65
|
|
13/08/2014
|
20/02/2017
|
100
|
|
|
|
|
482
|
RTIP-II/DHA/UNR-12-STR-2
|
a) Construction of 30m bridge at Ch. 3+000 km on Dhamrai Pourasava (Bata gate) to Jalsin bazar road
|
RTIP-2
|
dhamrai
|
|
30.00
|
|
|
174.60
|
Joint Venture of M/S. Surma Enterprise & M/S. Hossain Construction (SE-HC JV)
|
554.12
|
|
23/07/2015
|
16/05/2017
|
100
|
|
|
|
|
483
|
RTIP-II/DHA/UZR-8-STR-26
|
Construction of 75 m Long RCC Girder Bridge at Ch. 12+700 km on Dhantara GC to Pakutia GC (Nagarpur, Tangail) road
|
RTIP-2
|
dhamrai
|
|
75.00
|
|
|
381.58
|
Fahim Construction
|
339.84
|
|
06/12/2015
|
30/04/2018
|
50
|
|
|
|
|
484
|
RTIP-II/DHA/UNR-12(a)-STR-37
|
b) Construction of 2x4.0x3.0 m Box culvert at Ch. 7+800 km on Dhamrai Pourasava to Savar Bazar via Mamura road
|
RTIP-2
|
dhamrai
|
|
50.00
|
|
|
72.19
|
|
0.00
|
|
18/07/2016
|
30/11/2018
|
85
|
|
|
|
|
485
|
RTIP-II/DHA/RPM-198
|
a) Dhantara GC-Kushura GC Road
|
RTIP-2
|
dhamrai
|
|
7.90
|
|
|
226.53
|
JV of M/S. Salim Enterprise & M/S. Usha Enterprise (Salim & Usha JV)
|
403.40
|
|
07/09/2015
|
31/07/2017
|
100
|
|
|
|
|
486
|
RTIP-II/DHA/RPM-330
|
Dhamrai RHD - Dhantara GC Road
|
RTIP-2
|
dhamrai
|
|
6.20
|
|
|
301.85
|
Padma Construction & Supplying firm
|
261.73
|
|
11/10/2016
|
10/10/2017
|
32
|
|
|
|
|
487
|
RTIP-II/DHA/RPM-348
|
Jalsa RHD-Suapur GC via Sutipara UP office Road
|
RTIP-2
|
dhamrai
|
|
12.68
|
|
|
571.03
|
M/S. Kohinoor and Kofil Enterprise JV
|
531.39
|
|
14/03/2017
|
22/01/2018
|
100
|
|
|
|
|
488
|
RTIP-II/DHA/RPM-198
|
b) Mokshedpur Bazar (Dohar)-Pollybazar-Moura Bazar-Marichpatty-Kamarkhola-Churain-Benukhali(Nawabgonj) road (Dohar portion).
|
RTIP-2
|
dohar
|
|
6.25
|
|
|
232.33
|
|
0.00
|
|
07/09/2015
|
31/07/2017
|
100
|
|
|
|
|
489
|
RTIP-II/DHA/RPM-331
|
Joypara GC-Majhirchar bazar-Kutubpur-Debinagar-Kulchari-Kazirchar RHW Road
|
RTIP-2
|
dohar
|
|
7.29
|
|
|
213.91
|
Padma Construction & Supplying firm
|
191.39
|
|
11/10/2016
|
10/10/2017
|
66
|
|
|
|
|
490
|
RTIP-II/DHA/UZR-61
|
b) Dhalikandi RHD to Paragram GC via Dhalikandi Ferry Ghat Road
|
RTIP-2
|
keraniganj
|
|
3.07
|
|
|
503.53
|
|
0.00
|
|
15/11/2016
|
30/06/2018
|
0
|
|
|
|
|
491
|
RTIP-II/DHA/UNR-12
|
d) Nekrozebag R&H to Dhaka Mawa road at Abdullahpur via Muktirbag & Firm of Raton Road
|
RTIP-2
|
keraniganj
|
|
2.77
|
|
|
250.55
|
|
0.00
|
|
13/08/2014
|
20/02/2017
|
100
|
|
|
|
|
492
|
RTIP-II/DHA/RPM-74.1
|
Hasnabad Power Station-Mollarhat Road via Bibir Bazar, Mawa, Paina Bazar, Purbadi Ghoshbar
|
RTIP-2
|
keraniganj
|
|
5.50
|
|
|
110.75
|
M/S. Hanif Enterprise
|
122.18
|
|
18/07/2013
|
01/03/2014
|
100
|
|
|
|
|
493
|
RTIP-II/DHA/RPM-74.2
|
Hasnabad Power Station-Mollarhat Road via Bibir Bazar, Mawa, Paina Bazar, Purbadi Ghoshbar
|
RTIP-2
|
keraniganj
|
|
6.30
|
|
|
143.39
|
M/S. Star Builders
|
151.03
|
|
02/05/2013
|
20/04/2014
|
100
|
|
|
|
|
494
|
RTIP-II/DHA/RPM-105
|
Kolatia GC-Amin Bazar GC via Dhalikandi & Algir char road
|
RTIP-2
|
keraniganj
|
|
8.57
|
|
|
196.48
|
M/S. Hanif Enterprise
|
209.58
|
|
26/01/2014
|
25/01/2015
|
100
|
|
|
|
|
495
|
RTIP-II/DHA/UNR-12-STR-2
|
c) Construction of 25m bridge at Ch. 1+785km on Nekrozebag R&H to Dhaka Mawa road at Abdullahpur via Muktirbag & Firm of Raton road
|
RTIP-2
|
keraniganj
|
|
50.00
|
|
|
191.59
|
|
0.00
|
|
23/07/2015
|
16/05/2017
|
100
|
|
|
|
|
496
|
RTIP-II/DHA/RPM-332
|
Kalatia-Baluartack Bishaw Road via Ramerkanda, Ruhitpur Sonakanda.
|
RTIP-2
|
keraniganj
|
|
14.00
|
|
|
962.98
|
M/S. Dolly Construction & Infratech Construction Company [(Dolly Construction-Infratech (JV)]
|
820.91
|
|
01/10/2016
|
30/09/2017
|
100
|
|
|
|
|
497
|
RTIP-II/DHA/UZR-61
|
a) Paragram GC to Kolatia GC rd via Dhalikandi F.Ghat (N.Por).
|
RTIP-2
|
nawabganj
|
|
3.20
|
|
44
|
546.87
|
Al Amin Construction Co. Ltd & Kingdom Builders Limited (AL-Amin-Kingdom-JVA)
|
1010.23
|
11/08/2016
|
15/11/2016
|
30/04/2019
|
50
|
|
44
|
08/04/2019
|
|
498
|
RTIP-II/DHA/UNR-74
|
Barrah U.P office-Aowna bazar via Mahtabpur Nawabgram hat UZR road.
|
RTIP-2
|
nawabganj
|
|
5.90
|
|
|
660.56
|
M/S. Nawal Construction
|
576.80
|
|
12/01/2017
|
31/03/2019
|
70
|
|
|
|
|
499
|
RTIP-II/DHA/RPM-75.1
|
Nawabgonj-Paragramhat GC
|
RTIP-2
|
nawabganj
|
|
8.00
|
|
|
193.57
|
M/S. Hanif Enterprise
|
213.27
|
|
16/07/2013
|
07/11/2014
|
100
|
|
|
|
|
500
|
RTIP-II/DHA/RPM-75.2
|
Nawabgonj-Paragramhat GC
|
RTIP-2
|
nawabganj
|
|
8.43
|
|
|
197.83
|
M/S. Bashary Traders & Al Huda Enterprise (JV)
|
219.49
|
|
16/07/2013
|
01/06/2014
|
100
|
|
|
|
|
501
|
RTIP-II/DHA/RPM-107
|
b) Shikaripara U.P office-Jamsha Bazar via Bishompur road
|
RTIP-2
|
nawabganj
|
|
6.10
|
|
|
137.66
|
|
0.00
|
|
09/03/2014
|
17/07/2016
|
100
|
|
|
|
|
502
|
RTIP-II/DHA/RPM-333
|
Bandura (Alalpur)-Baruakhali-Sikaripara road (UZR #42)
|
RTIP-2
|
nawabganj
|
|
5.34
|
|
|
154.81
|
Padma Construction & Supplying firm
|
109.24
|
|
11/10/2016
|
25/04/2018
|
100
|
|
|
|
|
503
|
RTIP-II/DHA/RPM-347
|
Dohar-Katakhali-Nikara-Gobindapur-Tikarpur-Galimpur road
|
RTIP-2
|
nawabganj
|
|
3.30
|
|
|
121.68
|
M/S. Israth Builders
|
113.59
|
|
02/02/2017
|
01/02/2018
|
100
|
|
|
|
|
504
|
RTIP-II/DHA/UNR-12
|
c) Dhaka-Aricha RHD 20 Mile Army check post-Pathalaia UP (Ghugudia) Road
|
RTIP-2
|
savar
|
|
3.55
|
|
|
313.90
|
|
0.00
|
|
13/08/2014
|
20/02/2017
|
100
|
|
|
|
|
505
|
RTIP-II/DHA/RPM-106
|
Ashulia UP Office-Rustumpur bazar road
|
RTIP-2
|
savar
|
|
3.33
|
|
|
110.67
|
M/S. Aunica International
|
120.57
|
|
19/03/2014
|
08/11/2015
|
100
|
|
|
|
|
506
|
RTIP-II/DHA/UNR-12-STR-2
|
d) Construction of 2x4.00x5.50m RCC Box Culvert at Ch. 2+150km on Dhaka-Aricha RHD 20 Mile Army check post-Pathalaia UP (Ghugudia) Road
|
RTIP-2
|
savar
|
|
8.00
|
|
|
48.19
|
|
0.00
|
|
23/07/2015
|
16/05/2017
|
100
|
|
|
|
|
507
|
RTIP-II/DHA/RPM-199
|
Zirani Bazar-Shimulia Bazar Road
|
RTIP-2
|
savar
|
|
8.25
|
|
|
749.53
|
AL_AMIN-KINGDOM-JVA
|
786.29
|
|
07/08/2016
|
28/02/2019
|
80
|
|
|
|
|
508
|
RTIP-II/DHA/RPM-346
|
Bhakurta UP-Mugrakanda-Mohammad Pur. City protection embankment Rd.
|
RTIP-2
|
savar
|
|
1.30
|
|
|
329.20
|
Western Engineering (Pvt.) Ltd
|
63.49
|
|
20/03/2017
|
19/12/2017
|
100
|
|
|
|
|
509
|
RTIP-II/DHA/RPM-392
|
Savar Bazar Bus Stand-Birulia UP-Birulia bazar Rd
|
RTIP-2
|
savar
|
|
2.68
|
|
|
214.37
|
Topline
|
192.75
|
|
25/04/2017
|
30/06/2018
|
100
|
|
|
|
|
510
|
RTIP-II/DHA/RPM-107
|
a) Khelkhet-Isapur road
|
RTIP-2
|
tejgaon circle
|
|
6.11
|
|
|
127.50
|
M/S. Tanvir Traders
|
282.03
|
|
09/03/2014
|
17/07/2016
|
100
|
|
|
|
|
511
|
SP23045
|
Manukhali Subproject :Re-excavation of Manukhali Branch 1.40 km Khal (Ch.0+000km to Ch.1+400km)
|
SSWRDP-JICA-2
|
dhamrai
|
|
1.40
|
0.00
|
100
|
9.59
|
LCS
|
9.59
|
08/05/2019
|
|
31/05/2019
|
100
|
9.59
|
100
|
30/06/2020
|
|
512
|
w.449
|
Construction of Vararia UP Complex
|
UCCP-2
|
dhamrai
|
|
|
|
100
|
100.34
|
|
92.92
|
10/07/2016
|
|
10/02/2017
|
100
|
92.85
|
100
|
17/08/2020
|
|
513
|
140/246
|
Construction of Gangutia UP
|
UCCP-2
|
dhamrai
|
|
|
|
100
|
35.00
|
|
35.00
|
07/04/2005
|
|
30/06/2011
|
100
|
34.58
|
100
|
16/07/2020
|
|
514
|
87/176
|
Construction of joykrishnapur UP Complex
|
UCCP-2
|
nawabganj
|
|
|
|
|
153.97
|
|
147.32
|
24/10/2019
|
|
31/05/2020
|
15
|
0.00
|
|
03/09/2020
|
|
515
|
139/246
|
CONSTRUCTION OF GALIMPUR UP
|
UCCP-2
|
nawabganj
|
|
|
|
0
|
25.00
|
|
26.32
|
13/01/2001
|
|
13/02/2002
|
0
|
0.00
|
0
|
16/07/2020
|
|
516
|
w.300
|
Construction of Dhamsona (sanirvor)UP Complex
|
UCCP-2
|
savar
|
|
|
|
100
|
98.83
|
|
103.72
|
22/10/2013
|
|
16/06/2017
|
100
|
103.70
|
100
|
17/08/2020
|
|
517
|
w.359
|
Construction of Uttarkhan UP Complex
|
UCCP-2
|
tejgaon circle
|
|
|
|
100
|
119.57
|
|
114.92
|
23/10/2014
|
|
16/06/2017
|
100
|
114.86
|
100
|
17/08/2020
|
|
518
|
CBU-100/ Purto-01
|
ঢাকা জেলার ধামরাই উপজেলাধীন আরএইচডি(দিপ টেক্সটাইল) -কাইঠামারা সড়কের ১৭৪০মিটার চেইনেজে গাজখালী খালের উপর RCC ব্রিজ নির্মাণ (রোড আইডি: ৩২৬১৪৫০৭৫)
|
UHBP
|
dhamrai
|
326145075
|
|
51.00
|
0
|
431.68
|
M/S Shahana Enterprise-Faridpur Jannat Construction Ltd (JV), West Goalchamut, Faridpur Sadar, Faridpur.
|
405.63
|
04/05/2021
|
|
30/09/2024
|
95
|
332.21
|
0
|
28/09/2024
|
|
519
|
CBU-100/ Purto-02
|
ঢাকা জেলার ধামরাই উপজেলাধীন সোমভাগ ইউপি অফিস-বাড়ারিয়া ইউপি অফিস রোয এ ৬৫০মিঃ চেইনেজে বংশী নদীর উপর PSC ব্রিজ নির্মাণ (রোড আইডিঃ ৩২৬১৪৩০১৪)
|
UHBP
|
dhamrai
|
326143014
|
|
96.00
|
0
|
1051.78
|
Kamarjani-Anowara(JV), 15No Shreeangan Market, Goalchamot, Faridpur.
|
965.21
|
24/10/2020
|
24/10/2020
|
30/03/2024
|
85
|
800.84
|
0
|
28/09/2024
|
|
520
|
CBU-100/ Purto-341
|
ঢাকা জেলার ধামরাই উপজেলাধীন ছোট কালামপুর আশ্রয়ন বিসি সড়কের ১১৫ মিঃ চেইনেজে দেপাশাই করাবিল ফরহাদের বাড়ী বংশী নদীর উপর সেতু নির্মাণ (রোড আইডি-৩২৬১৪৪০৯১)।
|
UHBP
|
dhamrai
|
326144091
|
|
58.00
|
0
|
676.68
|
M/S Upakul Construction
|
664.16
|
01/01/1900
|
|
|
0
|
0.00
|
0
|
28/09/2024
|
|
521
|
CBU-100/ Purto-08
|
ঢাকা জেলার দোহার উপজেলাধীন জয়পাড়া জিসি-বৌবাজার-কাঠালীঘাটা-মাঝিরকান্দা (RHW) (দোহার অংশ) পর্যন্ত সড়কে ১৩৫০ মিটার চেইনেজে সাহেবখালী খালের উপর RCC ব্রিজ নির্মাণ (রোড আইডি : ৩২৬১৮৪১১০)
|
UHBP
|
dohar
|
326184110
|
|
48.00
|
0
|
430.46
|
Eastland_Isamoti (JV), Bagmara Bazar, Nawabganj, Dhaka.
|
435.82
|
03/02/2020
|
09/02/2020
|
30/09/2022
|
100
|
435.80
|
0
|
28/09/2024
|
|
522
|
CBU-100/ Purto-09
|
ঢাকা জেলার দোহার উপজেলাধীন চরকুশাই RHW- দেলোয়ারের বাড়ী-ছোরমান বেপারী বাড়ী পর্যন্ত সড়কে ৪০০মিটার চেইনেজে RCC ব্রিজ নির্মাণ (রোড আইডি: ৩২৬১৮৪১১৫)
|
UHBP
|
dohar
|
326184115
|
|
42.00
|
0
|
489.04
|
Asian Traffic Technologies Ltd, 5/1/M, Mohonpur, Ring Road, Shamoli, Dhaka.
|
444.41
|
05/02/2020
|
12/02/2020
|
27/08/2023
|
100
|
442.37
|
0
|
28/09/2024
|
|
523
|
CBU-100/ Purto-10
|
ঢাকা জেলার দোহার উপজেলাধীন মাঝিরচর (পূর্ব চর)-সামাদ মেম্বারের বাড়ী-মোহন মৃধার বাড়ী-ওমর মৃধা বাড়ী পর্যন্ত সড়কে ১০৫০ মিটার চেইনেজে RCC ব্রিজ নির্মাণ (রোড আইডিঃ ৩২৬১৮৪২০১)
|
UHBP
|
dohar
|
326184201
|
|
48.00
|
0
|
399.24
|
M/S Kofil & Joyti Enterprise JV, Holding No. 64/7, Shop No. 00, Dogormora, CRP Road, Savar, Dhaka.
|
402.58
|
27/01/2020
|
02/02/2020
|
30/11/2022
|
100
|
402.48
|
0
|
28/09/2024
|
|
524
|
CBU-100/ Purto-03
|
ঢাকা জেলার নবাবগঞ্জ উপজেলাধীন মোকশেদপুর (দোহার) - পল্লীবাজার-মাওয়াবাজার-মরিচপট্টি -কামারখোলা-চুরাইন-বেনুখালী সড়কে ৯৮০ মিটার চেইনেজে RCC সেতু পুনঃনির্মাণ (রোড আইডিঃ ৩২৬৬২২০১২)
|
UHBP
|
nawabganj
|
326622012
|
|
18.00
|
0
|
239.58
|
Sikder-Samrat JV, C#10, 144 New Baily Road, Dhaka.
|
200.10
|
05/02/2020
|
11/02/2020
|
30/06/2022
|
100
|
196.06
|
0
|
28/09/2024
|
|
525
|
CBU-100/ Purto-04
|
ঢাকা জেলার নবাবগঞ্জ উপজেলাধীন কৈলাইল ইউপি অফিস-তুলশিখালী (মরিচা) ফেরীঘাট বাজার সড়কে ৩৯০০ মিটার চেইনেজে RCC সেতু নির্মাণ (রোড আইডিঃ ৩২৬৬২৩০১৮)
|
UHBP
|
nawabganj
|
326623018
|
|
0.00
|
100
|
511.31
|
M/S. Saymum Teaders-M/S. M.A Engineering (JV), South Charicha Bazar, Charfassain, Bhola.
|
277.08
|
20/01/2020
|
26/01/2020
|
06/08/2024
|
100
|
277.08
|
100
|
28/09/2024
|
|
526
|
CBU-100/ Purto-04(A)
|
ঢাকা জেলার নবাবগঞ্জ উপজেলাধীন কৈলাইল ইউপি অফিস-তুলশিখালী (মরিচা) ফেরীঘাট বাজার সড়কে ৩৯০০ মিটার চেইনেজে অসমাপ্ত সেতু নির্মাণ (রোড আইডিঃ ৩২৬৬২৩০১৮)
|
UHBP
|
nawabganj
|
326623018
|
|
42.00
|
0
|
220.45
|
M/S. Isamoti Traders
|
238.36
|
17/09/2023
|
17/09/2023
|
06/08/2024
|
65
|
127.50
|
0
|
28/09/2024
|
|
527
|
CBU-100/ Purto-05
|
ঢাকা জেলার নবাবগঞ্জ উপজেলাধীন পাতিলঝাপ বাজার-দত্তকখন্ড -চারিগ্রাম হাট ভায়া কুমুল্লী সড়কে ১০০০ মিটার চেইনেজে RCC সেতু নির্মাণ (রোড আইডিঃ ৩২৬৬২৪১০০)
|
UHBP
|
nawabganj
|
326624100
|
|
20.00
|
0
|
249.56
|
Farok and Brothers, Barrah, Nawabganj, Dhaka.
|
205.47
|
05/02/2020
|
12/02/2020
|
30/04/2022
|
100
|
204.35
|
0
|
28/09/2024
|
|
528
|
CBU-100/ Purto-06
|
ঢাকা জেলার নবাবগঞ্জ উপজেলাধীন পাড়াগ্রাম হাট ইউজেডআর মাহাতাবপুর-আউনা বাজার ভায়া কবরস্থান সড়কে ৫৫৬ মিটার চেইনেজে আরসিসি ভেরিয়েবল ডেপথ গার্ডার সেতু নির্মাণ (রোড আইডিঃ ৩২৬৬২৪০৬৯)
|
UHBP
|
nawabganj
|
326624069
|
|
32.00
|
0
|
596.21
|
|
0.00
|
01/01/1900
|
|
|
0
|
0.00
|
0
|
28/09/2024
|
|
529
|
CBU-100/ Purto-07
|
(ক) ঢাকা জেলার নবাবগঞ্জ উপজেলাধীন পাতিলঝাপ বাজার-দত্তখন্ড-চারিগ্রাম হাট টার্নিং পয়েন্ট রাস্তা ভায়া কুমুল্লী সড়কে ১৭০০ মিটার চেইনেজে (রোড আইডিঃ ৩২৬৬২৪১০০) সেতু নির্মাণ।
|
UHBP
|
nawabganj
|
326624100
|
|
36.00
|
0
|
439.74
|
Isamoti-Islamb (JV)
|
911.74
|
20/11/2022
|
20/11/2022
|
19/11/2024
|
97
|
879.78
|
0
|
28/09/2024
|
|
530
|
|
(গ) ঢাকা জেলার নবাবগঞ্জ উপজেলাধীন কৈলাইল ইউপি তুলশিখালী (মরিচা) ফেরীঘাট বাজার সড়কে ৬৫০০ মিটার চেইনেজে ব্রিজ নির্মাণ (রোড আইডি-৩২৬৬২৩০১৮)।
|
UHBP
|
nawabganj
|
326623018
|
|
20.00
|
0
|
286.67
|
|
0.00
|
01/01/1900
|
|
|
100
|
0.00
|
0
|
28/09/2024
|
|
531
|
CBU-100/ Purto-342
|
ঢাকা জেলার নবাবগঞ্জ উপজেলাধীন মরিচপট্টি মেইন সড়ক হতে মিজান মেম্বারের বাড়ি-মরিচপট্টি ঈদগা সড়কে ২০০মিটার চেইনেজে ব্রিজ নির্মাণ (রোড আইডি-৩২৬৬২৪২৯২)।
|
UHBP
|
nawabganj
|
326624292
|
|
24.00
|
0
|
421.18
|
Anita Enterprise
|
396.60
|
25/03/2024
|
|
25/05/2025
|
0
|
0.00
|
0
|
28/09/2024
|
|
532
|
CBU-100/ Purto-343
|
ঢাকা জেলার নবাবগঞ্জ উপজেলাধীন শোল্লা ইউপি অফিস-দত্তখন্ড- বালুখন্ড বাজার রোড ভায়া পাটিলঝাপ বাজার সড়কে ৫৬০০মিটার চেইনেজে সেতু নির্মাণ (রোড আইডি-৩২৬৬২৩০১৩)।
|
UHBP
|
nawabganj
|
326623013
|
|
39.00
|
0
|
439.31
|
M/S. Saymum Teaders-M/S. M.A Engineering (JV).South Charicha bazar, Charfassain, Bhola.
|
402.56
|
19/12/2021
|
|
25/06/2024
|
92
|
340.16
|
0
|
28/09/2024
|
|
533
|
UIIP-BC/PCO/W-215
|
1) Improvement of RCC road at Banpukar Main road joynal abedin house to kamal garments road (Ch. 0.00+000-0+505.00m) & Partly Drain top slab, in ward no - 03, Savar, Pourashava, Dhaka2) Improvement of RCC road starting from rajashoin Palowan para more to house to sufia bakary in w and no - 08, Savar Pourashava, Savar, Dhaka (Ch. 0.00+000-0+525.00m)
|
UIIP
|
savar
|
|
1.03
|
0.00
|
100
|
160.93
|
M/S JAHAN ENTERPRISE
|
141.07
|
26/11/2020
|
03/12/2020
|
25/05/2021
|
100
|
141.02
|
100
|
17/10/2024
|
|
534
|
UIIP-PCO/BCO/W-469
|
Construction of RCC Drain with slab at starting from Kotbari Kamal Garments Road Kobba Mosque to Balumath to Paramount school in ward no - 02, SavarPourashava, Savar, Dhaka. (Ch. 0.00-345.00m)
Construction of R.C.C Road at starting from Kotbari Kamal Garments Road Kobba Mosque to Balumath to Paramount school in ward no - 02, SavarPourashava, Savar, Dhaka. (Ch. 0.00-345.00m)
|
UIIP
|
savar
|
|
0.35
|
0.00
|
100
|
120.46
|
G2G Tech Limited
|
104.21
|
24/04/2022
|
07/05/2022
|
28/04/2023
|
100
|
98.33
|
100
|
17/10/2024
|
|
535
|
UIIP-PCO/BCO/W-470
|
Construction of RCC Drain with slab at starting from Dhaka-Aricha Road JamanTreders(Near Rana Plaza) to RobindronathBabu to Mojidpur Road Mridha Bari. (ch-0.00-235.00 m)
2.Construction of R.C.C Road at starting from Dhaka-Aricha Road JamanTreders(Near Rana Plaza) to RobindronathBabu to Mojidpur Road Mridha Bari. (ch-0.00-235.00 m)
|
UIIP
|
savar
|
|
0.24
|
0.00
|
100
|
72.71
|
M/S JAHAN ENTERPRISE
|
62.89
|
24/04/2022
|
07/05/2022
|
28/04/2023
|
100
|
56.33
|
100
|
17/10/2024
|
|
536
|
UIIP-PCO/BCO/W-471
|
1.Construction of RCC u-Drain Starting from Dhaka-Aricha high way near Talbag Grave yeard to Thana road near woman collage. (Ch- 0.00+000-0+215.00m), in ward no - 06, SavarPourashava, Savar, Dhaka. 2.Improvement of RCC Road from Dhaka-Aricha high way near Talbag Grave yeard to Thana road near woman collage. (Ch- 0.00+000-0+215.00m), in ward no - 06, SavarPourashava, Savar, Dhaka.
|
UIIP
|
savar
|
|
0.22
|
0.00
|
100
|
75.00
|
Buildex & MNC (JV.)
|
64.52
|
24/04/2022
|
07/05/2022
|
28/04/2023
|
100
|
59.49
|
100
|
17/10/2024
|
|
537
|
UIIP-BC/PCO/W-619
|
Improvement of BC road at starting from Dhaka-Aricha Road Chourongi Super Market to Rajasion Vission Garments in ward no-08 under Savar Pourashava ( Ch.30.00-2565.00m) Salvage Amount=6,24,461.00)
|
UIIP
|
savar
|
|
2.54
|
|
100
|
301.32
|
Shikder Builders
|
264.86
|
17/02/2024
|
18/02/2024
|
17/02/2025
|
45
|
259.38
|
100
|
17/10/2024
|
|
538
|
UIIP-BC/PCO/W-621
|
Improvement of RCC Road starting from Ganda Mr. Roton Matbor Store to Engr. Abul Kalam Azad house in ward no-09, Savar Pourashava, Savar Dhaka
|
UIIP
|
savar
|
|
|
|
0
|
21.94
|
|
0.00
|
|
|
|
0
|
0.00
|
0
|
17/10/2024
|
|
539
|
UIIP-BC/PCO/W-70
|
A) Construction of RCC Road Starting from Care Bridge to Mohendra ghosh shop in w ard no - 02 Savar Pourashava Savar Dhaka. Ch. 0.00000-0200.00m232672-20-20008
B) Improvement of DBC & RCC Road Starting from Jamsing Nobin Market to Joypara Hasmot Alis house Ch. 0.00000-0500.00m. Link-1 North Jamsing Samsul Aloms hose to Hazi Md. Momtaz Uddin house Ch. 0.00000-0295.00m in ward no - 01 Savar Pourashava Savar Dhaka.
|
UIIP
|
savar
|
|
1.00
|
0.00
|
58
|
129.42
|
M/S Sumon Enterprise
|
100.80
|
26/07/2020
|
04/08/2020
|
31/08/2022
|
100
|
58.82
|
58
|
29/09/2022
|
|
540
|
UIIP-BC/PCO/W-71
|
Improvement of R.C.C Road Starting from Imandipur chowrasta mor to Khokon Traders more ch.0600-1350m via councilor house at UpazilaSAVARward no 07 under savar pourashava.
|
UIIP
|
savar
|
|
0.75
|
0.00
|
90
|
127.36
|
M/S Kofil Enterprise
|
112.00
|
26/07/2020
|
02/08/2020
|
01/08/2021
|
100
|
101.04
|
90
|
29/09/2022
|
|
541
|
UIIP-BC/PCO/W-214
|
1) Construction of RCC raod starting form Chapain road ala uddin charman market to dogomora house ara house via samad molla house in w and no-07, savar pourashava, savar, dhaka (Ch. 0.00+000-0.250.00m)2) Construction of RCC road & Vertical extension of Brick drain with slab from bank colony alom shaheb house to thana road mohila college via treepti chanachur more, in ward no -05, Savar pourashava, Savar, Dhaka, (Ch. 0.00+000-0+250m)
|
UIIP
|
savar
|
|
0.50
|
0.00
|
84
|
87.33
|
Raka Enterprise
|
75.10
|
26/07/2020
|
03/08/2020
|
03/08/2021
|
100
|
63.47
|
84
|
29/09/2022
|
|
542
|
UIIP-BC/PCO/W-216
|
(1) Improvement of RCC Road Starting from Moddah Rajashion Eidgah more to Soleman Mosque, in w ard no - 08, Savar Pourashava, Savar, Dhaka. (Ch. .00+000-0+600.00m)(2) Construction of RCC Road & Brick Drain up with slab from Savar south para Ad. Usuf shaheb's house to Chandon babu house in ward no-04, Savar Pourashava, Savar, Dhaka. (Ch. 0.00+000-0+301.00m), in ward no-04, Savar Pourashava, Savar, Dhaka.
|
UIIP
|
savar
|
|
0.90
|
0.00
|
85
|
141.36
|
M/S JAHAN ENTERPRISE
|
122.29
|
26/11/2020
|
03/12/2020
|
30/06/2021
|
100
|
104.39
|
85
|
29/09/2022
|
|
543
|
UIIP-PCO/BCO/W-468
|
1.Construction of RCC Drain with slab at starting from Nama Bazar Jet Ghat Road to KheyaGhatFokirstore in ward no - 02, SavarPourashava, Savar, Dhaka. (Ch. 0.00-205.00m) 2.Construction of R.C.C Road at starting from Nama Bazar Jet Ghat Road to KheyaGhatFokir store in ward no -02, SavarPourashava, Savar, Dhaka. (Ch. 0.00-205.00m) 3.Construction of RCC Drain with slab at starting from Nama Bazar Banjaramraic via taramollah to bongsirever (Ch. 0.00-75.00m) & Link-1-tara mollah-vandary (Ch. 0.00-50.00m) & link-2,4,5,6 (Link-2,4,5,6-Ch. 0.00-18.75m x 4= 75.00m) in ward no -02, SavarPourashava, Savar, Dhaka. 4.Construction of R.C.C Road at starting from Nama Bazar Banjaramraic via taramollah to bongsirever (Ch. 0.00-75.00m) & Link-1-tara mollah-vandary (Ch. 0.00-50.00m) & R.C.C Road at link-2,4,5,6 (Link-2,4,5,6-Ch. 0.00-18.75m x 4= 75.00m) in ward no - 02, SavarPourashava, Savar, Dhaka.5.Construction of RCC Drain with slab at starting from Nama Bazar Jonu store to Bongsi River in ward no - 02, SavarPourashava, Savar, Dhaka. (Ch. 0.00-105.00m)
|
UIIP
|
savar
|
|
0.41
|
0.00
|
0
|
165.18
|
M/S JAHAN ENTERPRISE
|
142.88
|
28/04/2022
|
07/05/2022
|
28/04/2023
|
0
|
0.00
|
0
|
29/09/2022
|
|