Bagerhat

LGED BAGERHAT , District Scheme Details

Project Name
Upazila

District Scheme Details

SL No. Package No. Package Name Project Name Upazila Name Road ID Length of Road (Km) Length of Bridge (M) Building Qauntity (No) Estimated Amount (Lac) Name of Contractor Contract Amount (Lac) Date of Contract Date of Commencement Date of Completion Physical Progress (%) Financial Progress (Amt) Financial Progress (%) Date of Progress Update Remarks
1 CIB-Bag-W-22 Const. of 200m long PSC Girder Bridge over Madar Tola Khal river on Snaitola-Katakhali Bazar road at Ch. 4400m under Mongla Upazila, Dist. Bagerhat CIBRR mongla 201583003 200.00 100 2027.69 AK- MA ( JV) 2250.26 12/02/2018 19/02/2018 30/11/2022 100 2142.71 100 05/01/2025 Final bill paid.
2 CIB-Bag-W-116 Const. of 360m long PC Girder Bridge over Daudkhali river on Rampal-Bashtoli UP Road at Ch. 2131m under Rampal Upazila, Dist. Bagerhat CIBRR rampal 201733006 360.00 25 5336.97 MAX INFRASTRUCTURE LTD 5759.52 19/06/2022 26/06/2022 25/06/2025 40 1452.29 25 05/01/2025 Work is on going
3 CRMIDP/BGRH/W-132 Talesshor Hat CRMIDP kachua 81 258.00 M/S Atahar Enterprise 257.51 02/06/2020 30/06/2022 90 208.39 81 25/07/2022
4 CRMIDP/BGRH/W-133 Chunkhola Bazar CRMIDP mollahat 22 258.00 BCSK(JV) 214.00 22/04/2021 28/09/2022 25 46.61 22 25/07/2022
5 GSIDP/BGT/DW-1 Improvement of Ranjitpur High School Field in Khanpur Union Under Sadar Upazila, Bagerhat.[Latitude:22.7077 Longitude: 89.6419] GSIDP bagerhat-s 5.46 MS. Metu Enterprise 5.18 30/05/2018 14/01/2019 100  
6 GSIDP/BGT/DW-2 Improvment of Ranjitpur Gucchagram Jam-e-Mosque under Khanpur Union, Sadar Upazila, Dist.Bagerhat. [Latitude:22.6488 Longitude: 89.6975] GSIDP bagerhat-s 11.90 Wasim Ul Axim 11.30 27/05/2018 11/01/2019 0  
7 GSIDP/BGT/DW-3 Improvement of Gobordia Graveyard Under Karapara Union, Under Sadar Upazila, Dist.Bagerhat. .[Latitude:22.6469 Longitude: 89.7894] GSIDP bagerhat-s 11.10 MS. MD. Tarequzzama 10.55 15/05/2018 30/12/2018 0  
8 GSIDP/BGT/DW-4 Improvement of Sugandhi Madrasha attached Mosque Union Rakhalgachi, Under Sadar Upazila, Dist. Bagerhat.Latitude:22.6722 Longitude: 89.7083] GSIDP bagerhat-s 23.01 MS.Joy Enterprise 21.86 30/05/2018 14/01/2019 0  
9 GSIDP/BGT/DW-5 Improvement of Boundary wall at Kachua Cental Graveyard Under Kachua UP Kachua Upazila, Dist. Bagerhat.[Latitude:22.65082 Longitude: 89.88272] GSIDP kachua 10.00 Ms.Metu Enterprise 9.50 27/05/2018 10/01/2019 10  
10 GSIDP/BGT/DW-6 Improvement of Tengrakhali-Hazrapara Jame Mosque Under Kachua UP, Kachua Upazila, Dist.Bagerhat.[Latitude:22.54874 Longitude: 89.89636]. GSIDP kachua 10.00 MS. Metu Enterprise 9.90 02/07/2018 01/01/2019 50  
11 GSIDP/BGT/DW-7 Improvement of Shailkathi Jame Mosque Under Dopakhali UP Kachua Upazila, Dist. Bagerhat.[Latitude:22.71012 Longitude: 89.86205]. GSIDP kachua 5.00 MS. Metu Enterprise 4.75 21/06/2018 04/02/2019 100  
12 GSIDP/BGT/DW-8 Improvement of of Poschim Moghia Jame Mosque Under Moghia UP, Kachua Upazila, Dist. Bagerhat.[Latitude:22.67658 Longitude: 89.86863] GSIDP kachua 5.00 M/S Rumi Enterprise 4.75 21/06/2018 04/02/2019 100  
13 GSIDP/BGT/DW-9 Improvement of Gimatakhati-Shoshanghat Under Kachua UP, Kachua Upazila, Dist. Bagerhat.[Latitude:22.71012 Longitude: 89.86205] GSIDP kachua 5.00 MS. Metu Enterprise, 4.91 27/05/2018 10/01/2019 100  
14 GSIDP/BGT/DW-10 Improvement of Shibpur Mondir Under Raripara UP, Kachua Upazila, Dist. Bagerhat. .[Latitude:22.67829 Longitude: 89.85205] GSIDP kachua 10.00 Md.Nazrul Islam 9.50 15/05/2018 30/12/2018 35  
15 GSIDP/BGT/DW-11 Improvement of Moshni Surbojonin Durga Mondir Under Badal UP, Kachua Upazila, Dist. Bagerhat.[Latitude:22.59794 Longitude: 89.87902]. GSIDP kachua 5.00 MS.Rime Enterprise 4.75 20/05/2018 03/01/2019 100  
16 GSIDP/BGT/DW-12 Improvement of Boro Andermanik Surbojonin Durga Mondir Under Moghia UP, Kachua Upazila, Dist Bagerhat.[Latitude:22.68121 Longitude: 89.85205] GSIDP kachua 5.00 MS. Joy Enterprise 4.75 27/05/2018 10/01/2019 100  
17 GSIDP/BGT/DW-13 Improvement of of Rampal Central Mondir Under Rampal Sadar, Under Rampal Upazila, Dist.Bagerhat.[Latitude:22.5586124 Longitude: 89.6623701] GSIDP rampal 6.46 MS. Metu Enterprise 6.78 18/06/2018 17/12/2018 100  
18 GSIDP/BGT/DW-14 Improvement of Gilatola Purbopara Jame Mosque Under Bashtoli Union, Rampal Upazila, Dist.Bagerhat. [Latitude:22.5806672 Longitude: 89.7023304] GSIDP rampal 6.92 MS. Metu Enterprise 7.27 18/06/2018 17/12/2018 100  
19 GSIDP/BGT/DW-15 Improvement of Rampal Central Crematorium Under Rampal Sadar Union Under Rampal Upazila, Dist.Bagerhat. [Latitude:22.58185667 Longitude: 89.65672500] GSIDP rampal 7.18 MS. Metu Enterprise 7.54 18/06/2018 17/12/2018 0  
20 IRIDP-2/BGT/MW-92 Maintenance of Afra-Komorpur CARE Road (Ch. 00m-2500m) IRIDP-2 bagerhat-s 201084049 2.50 46.71 M/S Shovo Enterprise 41.79 06/03/2017 05/04/2017 100 20/05/2019
21 IRIDP-2/BGT/MW-93 Maintenance of Rakhalgachi UP-Chulkathi bazar via Ranjeetpur road (Ch. 00m-1000m) IRIDP-2 bagerhat-s 201084074 1.00 15.96 Md. Shariful Alam 13.81 06/03/2017 10/12/2017 100 20/05/2019
22 IRIDP-2/BGT/MW-94 Maintenance of Bottala bazar (Joygaci)-Kachua UP via Taleswar bazar (sadar portion) from Ch. Road (Ch.00m-2472m). IRIDP-2 bagerhat-s 201084075 2.48 44.30 M/S. Alif Store 39.31 26/02/2017 08/05/2017 100 20/05/2019
23 IRIDP-2/BGT/SDW-98 (a) Improvement of Jattapur Rathkhola_Jattrapur bridge via annodothakur Moinder Road (Ch.00m-1000m.(b) Construction of 1No 0.625mx0.60m Culvert at Ch. 93m on the same road. IRIDP-2 bagerhat-s 201085261 1.00 0.62 46.03 M/S. E.M Enterprise 47.99 07/05/2017 22/02/2018 100 20/05/2019
24 IRIDP-2/BGT/MW-110 Maintenance of Morga bazar-Bagerhat-Rupsha D.C.Road( Ch.700m-1700m).ID No. 201084034 IRIDP-2 bagerhat-s 201084034 1.00 20.78 M/S. Makka Traders 21.77 04/07/2017 04/12/2017 100 20/05/2019
25 IRIDP-2/BGT/MW-111 Maintenance of Karapara UP office - Karapara bazar via Magnitala bazar road ( Ch.00m-870m & 1167m-1994m).ID No. 201083022 IRIDP-2 bagerhat-s 201083022 1.70 27.76 M/S. Alif Store 29.12 05/07/2017 20/11/2017 100 20/05/2019
26 IRIDP-2/BGT/MW-112 Maintenance of Kandapara GC(Parnowapara)-Betkhali bazar-Taleswar bazar road( Ch.00m-1000m & 1780m-2485m).ID No. 201084019 IRIDP-2 bagerhat-s 201084019 1.71 28.97 M/S. Avanova Enterprise 30.18 22/08/2017 30/12/2018 100 20/05/2019
27 IRIDP-2/BGT/MW-113 Maintenance of Syedpur Madrasha road ( Ch.00m-1283m).ID No. 201085008 IRIDP-2 bagerhat-s 201085008 1.28 20.28 SK. Idrish Ali 20.23 22/06/2017 12/11/2017 100 20/05/2019
28 IRIDP-2/BGT/MW-114 Maintenance of Dema UP office - Hedayetpur bazar road ( Ch.00m-3207m).ID No. 201083021 IRIDP-2 bagerhat-s 201083021 3.21 48.67 M/S. Sohel Construction 50.96 21/06/2017 27/02/2018 100 20/05/2019
29 IRIDP-2/BGT/DW-122 Construction of 1No 3.0mx3.0m Culvert at Ch.1050m on Bishnapur UP-Bakerganj bazar Road. ID No. 201083007 IRIDP-2 bagerhat-s 201083007 3.00 16.26 M/S. Munna Enterprise 15.49 04/07/2017 09/04/2018 100 20/05/2019
30 IRIDP-2/BGT/DW-123 Construction of 1No 3.0mx3.0m Culvert at Ch.800m on Sugandi Primary schol-Late Dr. Abu syed H/O road ID No. 201085076 IRIDP-2 bagerhat-s 201085076 3.00 9.57 M/S. Rahamat Traders 9.40 12/06/2017 18/04/2018 100 20/05/2019
31 IRIDP-2/BGT/DW-124 Construction of 1No 3.0mx3.0m Culvert at Ch.808m on Madrasha bazar-Bisnupur via Fathapur GPS road. ID No. 201085278 IRIDP-2 bagerhat-s 201085278 3.00 9.57 M/S. Rahamat Traders 9.40 12/06/2017 30/07/2018 100 20/05/2019
32 IRIDP-2/BGT/SDW-131 Improvement of Koramara Moddapara Road (Ch.00m-271m).ID No. 201085322 IRIDP-2 bagerhat-s 201085322 0.27 26.03 M/S. Alif Store 24.44 08/11/2017 12/04/2018 100 20/05/2019
33 IRIDP-2/BGT/SMW-157 Maintenance of Bade Karapara Southpara Road (Ch.00-623m) IRIDP-2 bagerhat-s 201085080 0.62 8.62 M/S. Mijan Enterprise 9.05 07/03/2018 10/10/2018 100 20/05/2019
34 IRIDP-2/BGT/DW-44 Improvement of Khagra Ghat Primary School-Sarkardanga BWDB road (ch.00m-1000m). IRIDP-2 bagerhat-s 201084053 1.00 46.02 M/S. Sohel Construction 41.64 26/05/2016 01/12/2016 0 20/05/2019
35 IRIDP-2/BGT/DW-120 Improvement of Rupsha Bagerhat R& H-Provach shel House-Rakhalgachi bazar via Molla bari road ( Ch.1440m-2550m).ID No. 201085208 IRIDP-2 bagerhat-s 201085208 1.11 62.64 M/S. Mizan Enterprise 65.69 22/08/2017 29/05/2018 45 20/05/2019
36 IRIDP-2/BGT/DW-121 Improvement of Khudra chaksree pry. School-C&B bazar via Gobinda mondir road ( Ch.00m-1250m).ID No. 201085123 IRIDP-2 bagerhat-s 201085123 1.25 66.81 M/S. Mizan Enterprise 70.06 22/08/2017 29/05/2018 60 20/05/2019
37 IRIDP-2/BGT/MW-40 Maintenance of Mathabhanga R & H-Sukdara bus stand via Sunagar from road (ch.00m-850m). IRIDP-2 bagerhat-s 201084005 0.85 16.70 M/S. Sohel Construction 15.30 26/05/2016 31/12/2016 100 19/05/2019
38 IRIDP-2/BGT/MW-41 Maintenance of Paschim Shara BWD-Chaksree road (ch.00m - 2000m). IRIDP-2 bagerhat-s 201084012 2.00 38.21 M/S. Sohel Construction 35.05 26/05/2016 11/12/2016 100 19/05/2019
39 IRIDP-2/BGT/DW-43 Improvement of Madrasha Bazar - Bishnupur via Fatapur GPS road (ch.00m-750m). IRIDP-2 bagerhat-s 201085278 0.75 33.48 M/S. Sohel Construction 33.40 26/05/2016 02/01/2017 100 19/05/2019
40 IRIDP-2/BGT/DW-68 (a)Improvement of Khanpur UP (at polerhat)-Utkul bazar via Sreeghat bazar.road (Ch.4240m - 5905m). ID No. 201083002(b) Construction of 3No 0.625mx0.60m Culvert at Ch.885m,1032m&1170 on the Same Road. IRIDP-2 bagerhat-s 201083002 1.67 1.87 102.55 M/S. Habib Enterprise 107.65 06/11/2016 29/04/2018 100 19/05/2019
41 IRIDP-2/BGT/DW-69 (a)Improvement of Keshobpur-Chargram-Kondola-Talswar road (Ch.4100m - 5350m). ID No. 201085013(b) Construction of 1No 0.625mx0.60m Culvert at Ch.4950 on the Same Road. IRIDP-2 bagerhat-s 201085013 1.25 0.62 56.98 M/S. Bhuiyan Construction 56.96 23/10/2016 18/09/2017 100 19/05/2019
42 IRIDP-2/BGT/DW-12 (a) Improvement of West Saera bazar-Sreeghat bazar via sadullahpur Road from Ch. 00m-1000m. (b) Construction of 2Nos 0.600x0.625m Culvert at Ch. 100m & 285m on the Same Road. (c) Construction of 3.00x3.00mCulvert at Ch. 620m on the Same Road. IRIDP-2 bagerhat-s 201084069 1.00 4.20 61.91 M/S. Sohel Construction 52.91 17/01/2016 08/08/2016 100 14/05/2019
43 IRIDP-2/BGT/DW-13 (a) Improvement of Bishnapur UP-Bakerganj bazar Road from Ch. 6670m-7670m. (b) Construction of 0.600x0.625m Culvert at Ch. 7513m on the Same Road. IRIDP-2 bagerhat-s 201083007 1.00 0.60 79.96 Sardar Jashim 69.03 24/01/2016 08/12/2016 100 14/05/2019
44 IRIDP-2/BGT/DW-14 (a) Improvement of Hakimpur Pry. School-Chandromahol Road from Ch. 00m-1000m. (b) Construction of 0.600x0.625m Culvert at Ch. 760m on the Same Road. IRIDP-2 bagerhat-s 201085191 1.00 0.60 50.54 M/S Jharna Enterprise 43.46 27/01/2016 08/08/2016 100 14/05/2019
45 IRIDP-2/BGT/DW-15 (a) Improvement of Jattrapur UP-Baroipara bazar via Baghdia Road from Ch. 1650m-2900m. (b) Construction of 3Nos 0.600x0.625m Culvert at Ch. 1670m, 1925m & 2490m on the Same Road. IRIDP-2 bagerhat-s 201084072 1.25 1.80 68.50 M/S. Moon Enterprise 58.52 24/01/2016 27/10/2016 100 14/05/2019
46 IRIDP-2/BGT/MW-97 Maintenance of Durgapur RHD-Khaserhat GC-Kaligonj GC-Gazalia GC (CHT. Part) road (Ch.1070m-3710m) IRIDP-2 chitalmari 201142003 2.64 94.32 M/S. F.K Trade 79.43 06/03/2017 15/07/2017 100 14/05/2019
47 IRIDP-2/BGT/DW-99 (a) Improvement of Mollahat-Borabaria-Kananchak Road ( Ch.5556m-6302m).(b) Construction of 1No 0.625mx0.60m Culvert at Ch. 5775m on the Same Road. IRIDP-2 chitalmari 201142011 0.74 0.62 51.18 MS Deep Bricks 50.12 30/05/2017 03/06/2018 100 14/05/2019
48 IRIDP-2/BGT/DW-100 Improvement of Doriumajuri more - Doriumajuri Kali Mondir road( Ch.00m-750m).ID No. 201145117 IRIDP-2 chitalmari 201145117 0.75 59.20 M/S. Alif Store 53.28 30/05/2017 01/11/2017 100 14/05/2019
49 IRIDP-2/BGT/DW-4 (a) Improvement of Barabaria- Badamtala-Daluagunia Road from Ch. 1000m-2030m. (b) Construction of 5 Nos 0.625x0.600m Culvert at Ch. 1270m, 1490m, 1755m, 1825m & 2010m on the Same Road. IRIDP-2 chitalmari 201144033 1.03 3.12 51.91 M/S. F.K Trade Link 44.36 24/01/2016 08/08/2016 100 14/05/2019
50 IRIDP-2/BGT/DW-1 (a) Improvement of Bhannabara -Sonakhali Road from Ch. 00m-850m. (b) Construction of 3 Nos 0.625x0.600m Culvert at Ch. 320m, 604m & 763m on the Same Road. IRIDP-2 chitalmari 201145084 0.85 1.87 44.40 M/S. F.K Trade Link 39.50 24/01/2016 28/07/2016 100 13/05/2019
51 IRIDP-2/BGT/DW-2 (a) Improvement of Shampara-Kudari Via Panchpara Hat Road from Ch. 00m-1000m. (b) Construction of 2 Nos 0.625x0.600m Culvert at Ch. 491m & 626m on the Same Road. (c) Construction of 3 vent 4.00x4.00m Culvert at Ch. 312m on the Same Road. IRIDP-2 chitalmari 201144033 1.00 13.25 78.07 M/S. F.K Trade Link 66.71 24/01/2016 28/09/2016 100 13/05/2019
52 IRIDP-2/BGT/DW-3 Improvement of Moidah Shibpur Club - Kaligati Road from Ch. 878m-1678m. IRIDP-2 chitalmari 201144011 0.80 36.66 M/S. Sohel Construction 32.13 17/01/2016 27/08/2016 100 13/05/2019
53 IRIDP-2/BGT/DW-6 (a) Improvement of Basbaria-Umajuri Road from Ch. 1337m-1750m. (b) Construction of 1 No 0.625x0.600m Culvert at Ch. 1720m on the Same Road. IRIDP-2 chitalmari 201144019 0.41 0.62 23.74 M/S Faisal Traders 19.94 31/01/2016 08/08/2016 100 13/05/2019
54 RIDP-2/BGT/DW-5 (a) Improvement of Kuraltala-Boalia Road-WDB Embk. Road from Ch. 00m-750m. (b) Construction of 2 Nos 0.625x0.600m Culvert at Ch. 119m & 197m on the Same Road (c) Construction of 1 vent 4.30x3.60m Culvert at Ch. 269m on the Same Road. IRIDP-2 chitalmari 201144005 0.75 5.55 55.50 M/S. F.K Trade Link 47.69 24/01/2016 29/09/2016 100 13/05/2019
55 IRIDP-2/BGT/DW-48 (a) Improvement of Char Chinguri- Jalil Sheikh's House - Kalatala Road Ch. (700m-1494m) (b) Construction of 1 No 0.625x0.600m Culvert at Ch. 991m on the Same Road. IRIDP-2 chitalmari 201144055 0.79 0.62 38.30 M/S. F.K Trade Link 32.55 08/08/2016 100 13/05/2019
56 IRIDP-2/BGT/DW-53 (a) Improvement of Besharkhola (Bottola) - Bottola Abdul Gazi house road via Sultan Chairman house road (Ch.00m - 750m). ID No. 201145114(b) Construction of 2No 0.625mx0.60m Culvert at Ch.420m& 740m on the Same Road. IRIDP-2 chitalmari 201145114 0.75 1.25 43.50 M/S. F.K Trade Link 38.25 24/09/2016 22/08/2017 100 13/05/2019
57 IRIDP-2/BGT/MW-96 Maintenance of Khaserhat - Asoknagar road (Ch.1300m-2300m) IRIDP-2 chitalmari 201144032 1.00 17.04 M/S. Reza Enterprise 14.73 06/03/2017 07/12/2017 100 13/05/2019
58 IRIDP-2/BGT/DW-5 (a) Improvement of Kuraltala-Boalia Road-WDB Embk. Road from Ch. 00m-750m. (b) Construction of 2 Nos 0.625x0.600m Culvert at Ch. 119m & 197m on the Same Road (c) Construction of 1 vent 4.30x3.60m Culvert at Ch. 269m on the Same Road. IRIDP-2 chitalmari 201144005 0.75 55.50 M/S. F.K Trade Link 47.69 24/01/2016 100 20/03/2019
59 IRIDP-2/BGT/DW-106 (a)Improvement of Nawapara Pry. School-Syambagat road( Ch.00m-1200m).ID No. 201344060(b) Construction of 2No 0.60mx0.60m Culvert at Ch.360m&970 on the Same Road.(c) Construction of 1No 3.50mx3.0m Culvert at Ch.130m on the Same Road. IRIDP-2 fakirhat 201344060 1.20 4.70 65.85 M/S. M.M Brothers 64.69 10/07/2017 18/05/2018 100 14/05/2019
60 IRIDP-2/BGT/DW-107 (a)Improvement of Betaga Village road( Ch.00m-500m).ID No. 201345048(b) Construction of 2No 0.60mx0.60m Culvert at Ch.270m&420 on the Same Road. IRIDP-2 fakirhat 201345048 0.50 1.20 25.80 M/S. M.M Brothers 25.37 17/07/2017 31/05/2018 100 14/05/2019
61 IRIDP-2/BGT/DW-109 (a)Improvement of Shaitsika Village road( Ch.500m-1500m).ID No. 201345030(b) Construction of 3No 0.60mx0.60m Culvert at Ch.515m,815m&1120 on the Same Road. IRIDP-2 fakirhat 201345030 1.00 1.80 47.38 M/S. M.M Brothers 46.61 17/07/2017 02/06/2018 100 14/05/2019
62 IRIDP-2/BGT/SDW-134 (a)Improvement of Dhaka Khulna RHD ( Balurmat)-Lokhpur GC Road (Ch.1500m-2500m).ID No. 201344099(b) Construction of 4No 0.60mx0.60m Culvert at Ch.1653m,1794m,1981m&2450m on the Same Road. IRIDP-2 fakirhat 201344099 1.00 2.40 63.07 M/S. S.S Traders 59.90 12/12/2017 17/10/2018 100 14/05/2019
63 IRIDP-2/BGT/SDW-154 (a)Improvement of Dhaka Khulna RHD ( Balurmat)-Lokhpur GC Road (Ch.2500m-3700m).ID No. 201344099(b) Construction of 2No 0.60mx0.60m Culvert at Ch.2878m&3399m on the Same Road. IRIDP-2 fakirhat 201344099 1.20 1.20 71.68 M/S. S.S Traders 65.58 06/02/2018 15/10/2018 100 14/05/2019
64 IRIDP-2/BGT/SDW-155 (a)Improvement of Bailtoly-Lalchandrapur Road (Ch.00m-794m).ID No. 201344037(b) Construction of 1No 0.60mx0.60m Culvert at Ch.599m on the Same Road.(c) Construction of 1No 2.0mx2.0m Culvert at Ch.375m on the Same Road. IRIDP-2 fakirhat 201344037 0.79 2.60 50.88 M/S. Mijan Enterprise 46.27 30/01/2018 25/10/2018 100 14/05/2019
65 IRIDP-2/BGT/SDW-156 (a) Improvement of Bailtoly-Lalchandrapur road (Ch.794m-1520m)(b) Construction of 4Nos 0.60mx0.60m Culvert at Ch.874m. 1040m, 1189m, & 13463 on the same road. IRIDP-2 fakirhat 201344037 0.73 2.40 44.14 M/S. S.S Traders 39.86 19/08/2018 15/10/2018 100 14/05/2019
66 IRIDP-2/BGT/SDW-158 (a)Improvement of Baliadanga Natun mat - Police fari Road (Ch.00m-1116m).ID No. 201344101(b) Construction of 4No 0.60mx0.60m Culvert at Ch.78m,533m,717m&1065m on the Same Road. IRIDP-2 fakirhat 201344101 1.12 2.40 67.54 M/S Betaga traders 67.58 05/04/2018 11/12/2018 100 14/05/2019
67 IRIDP-2/BGT/DW-165 (a)Improvement of Khulna- Dhaka RHD(Ziel Tola)-Morolpara- Boiltali Sluice Gate road (Ch.00m- 1620m).ID No. 201344128(b) Construction of 05No 0.60mx0.60m Culvert at Ch.220m, 514m,756m,790m,1220m on the Same Road. 0 0 13,726,908.00 0.00 0 IRIDP-2 fakirhat 201344128 1.62 3.00 137.26 0.00 0 14/05/2019
68 IRIDP-2/BGT/DW-166 (a)Improvement of Piljong UP-Dhaka-khulna RHD ( Kolomer Dokan) road (Ch.00m- 2800m).ID No. 201344120(b) Construction of 08No 0.60mx0.60m Culvert at Ch.509m, 760m,910m,970m,1059m,1217m,1535m,2770m on the Same Road. 0 0 19,943,877.00 0.00 0 IRIDP-2 fakirhat 201344120 2.80 4.80 199.43 0.00 0 14/05/2019
69 IRIDP-2/BGT/DW-9 (a) Improvement of Naugiabari more RHD-Hosla-Bahirdia UP Road from Ch. 1000m-2100m. (b) Construction of 2Nos 0.600x0.600m Culvert at Ch. 1040m & 1590m on the Same Road. IRIDP-2 fakirhat 201343010 1.10 1.20 61.23 M/S. Mizan Enterprise 51.39 31/01/2016 06/12/2016 100 13/05/2019
70 IRIDP-2/BGT/DW-11 Improvement of Khulna Mollaharhat house building Road from Ch. 640m-823m. IRIDP-2 fakirhat 201345013 0.18 10.43 M/S. Mizan Enterprise 9.07 31/01/2016 03/08/2016 100 13/05/2019
71 IRIDP-2/BGT/MW-33 Maintenance of Shibbari - Dhar Moubhog road (ch.00m-1620m). IRIDP-2 fakirhat 201344013 1.62 37.51 M/S. Shovo Enterprise 29.58 24/02/2016 09/01/2016 100 13/05/2019
72 IRIDP-2/BGT/MW-34 Maintenance of Betaga life sub-centre - H/O Laxmikamti dash road (ch.00m - 2200m) IRIDP-2 fakirhat 201344030 2.20 37.39 M/S. Shovo Enterprise 29.51 31/07/2016 31/07/2016 100 13/05/2019
73 IRIDP-2/BGT/MW-35 Maintenance of Moubhog - Dohormoubhog road (ch.00m - 2855m) IRIDP-2 fakirhat 201344035 2.86 50.69 M/S. Shovo Enterprise 39.94 24/02/2016 20/01/2016 100 13/05/2019
74 IRIDP-2/BGT/MW-36 (a) Maintenance of Kuroltala kheyaghat - kalitala road (ch.00m-655m & 1920m- 3550m) (b) Construction of 01No 0.60mx0.60m Culvert at ch.449m on the Same Road. IRIDP-2 fakirhat 201344016 2.29 0.60 27.57 M/S. Shovo Enterprise 21.72 24/02/2016 11/04/2016 100 13/05/2019
75 IRIDP-2/BGT/DW-51 (a) Improvement of Betaga - Datneymari via Nicklaypur road (Ch: 00-1203m). (b) Construction of 3Nos 0.600x0.600m Culvert at Ch.228m,828m & 993m on the Same Road. IRIDP-2 fakirhat 201345085 1.20 1.80 57.49 Md. Shariful Alam 53.72 30/06/2016 20/09/2017 100 13/05/2019
76 IRIDP-2/BGT/DW-57 Improvement of Sattala-Bigai Shool via Nona Pukur road (Ch:1000-2000m). ID No. 201345083 IRIDP-2 fakirhat 201345083 1.00 50.78 M/S. Mijan Enterprise 49.76 09/01/2017 15/10/2017 100 13/05/2019
77 IRIDP-2/BGT/DW-58 Improvement of Faltita-Kathal bari Rd (Starting from Baniakhali toot Bridge) (Ch: 00-1000m).. ID No. 201344057 IRIDP-2 fakirhat 201344057 1.00 80.46 M/S. Mizan Enterprise 76.03 21/11/2016 27/08/2017 100 13/05/2019
78 IRIDP-2/BGT/DW-59 (a) Improvement of Khthaltala High school to Mokbul sk, house road (Ch.375m - 948m). ID No. 20114095(b) Construction of 3No 0.625mx0.60m Culvert at Ch.405m,510m& 870m on the Same Road. IRIDP-2 fakirhat 201344095 0.57 1.87 27.66 M/S. Mijan Enterprise 27.66 09/01/2017 09/04/2018 100 13/05/2019
79 IRIDP-2/BGT/DW-72 Construction of 1No 4.50mx3.0m Culvert at Ch.1950 on the Gazalia-Bishar khola Road. IRIDP-2 kachua 201384042 4.50 11.55 M/S. Bhuiyan Construction 11.53 23/10/2016 26/02/2017 100 20/05/2019
80 IRIDP-2/BGT/DW-73 Construction of 1No 4.50mx3.50m Culvert at Ch.950 on the B.Andermanik-S.Club-Kuchibaga-Andermanik H. school Road. IRIDP-2 kachua 201385014 4.50 12.06 M/S. Bhuiyan Construction 12.05 23/10/2016 12/02/2017 100 20/05/2019
81 IRIDP-2/BGT/DW-74 Construction of 1No 5.0mx3.50m Culvert at Ch.1000 on the Uttar-GopalpurFWC-Kachua Iron Bridge Road. IRIDP-2 kachua 201384043 5.00 12.43 M/S. Bhuiyan Construction 12.41 23/10/2016 02/01/2017 100 20/05/2019
82 IRIDP-2/BGT/DW-75 Construction of 1No 4.50mx3.50m Culvert at Ch.00 on the Sonakur-Charsonakur(Bot-tala)Primary School Road. IRIDP-2 kachua 201385015 4.50 12.06 M/S. Faruqe Enterprise 12.04 24/10/2016 08/01/2017 100 20/05/2019
83 IRIDP-2/BGT/DW-76 Construction of 1No 4.50mx3.00m Culvert at Ch.00 on the Kombolpur Road IRIDP-2 kachua 201385021 4.50 11.55 M/S. Tasfia Construction 12.03 24/10/2016 25/08/2017 100 20/05/2019
84 IRIDP-2/BGT/DW-84 (a) Improvement of Natun hat – bagmara Road ( Ch.00m-1008m).ID No. 201384012(b) Construction of 2No 2.00mx2.00m Culvert at Ch. 10m & 918 on the Same Road.(c) Construction of 1No 0.625mx0.60m Culvert at Ch.275m on the Same Road. IRIDP-2 kachua 201384012 1.01 4.62 87.74 M/S. Alif Store 75.20 04/01/2017 05/06/2017 100 20/05/2019
85 IRIDP-2/BGT/SDW-91 a) Improvement of Padmanagor Bridge - Ejara Padmanagor road (Ch.00m-1807m)b) Construction of 1no 2x4.0mx4.0m Culvert at Ch. 914m on the same on the same road.c) Construction of 1no 4.50mx3.0m Culvert at Ch. 536m on the same on the same road. d) Construction of 2no 0.625mx0.60m Culvert at Ch. 1068m, 1200m on the same on the same road. e) Construction of 1no 2.0mx2.0m Culvert at Ch. 1528m on the same road. IRIDP-2 kachua 201384065 1.81 15.75 115.93 Sardar Jashim 102.88 26/02/2017 28/01/2018 100 20/05/2019
86 IRIDP-2/BGT/MW-95 Maintenance of Vasha-Citabari Road (Ch. 00m-1030m) IRIDP-2 kachua 201384010 1.03 17.76 M/S Shovo Enterprise 15.95 06/03/2017 20/04/2017 100 20/05/2019
87 IRIDP-2/BGT/MW-115 Maintenance of Hazrakhali Bazar – Joygaashi Taleshwar road ( Ch.00m-1300m).ID No. 201384120 IRIDP-2 kachua 201384120 1.30 20.94 M/S. Shawon Enterprise 21.97 05/07/2017 30/10/2017 100 20/05/2019
88 IRIDP-2/BGT/MW-116 Maintenance of Vasha bazar-Boga bazar road ( Ch.00m-245m).ID No. 201384055 IRIDP-2 kachua 201384055 0.25 6.78 M/S. Shawon Enterprise 7.12 05/07/2017 29/10/2017 100 20/05/2019
89 IRIDP-2/BGT/MW-117 Maintenance of Goalmath - Raripara Palpara road ( Ch.00m-1000m).ID No. 201384004 IRIDP-2 kachua 201384004 1.00 19.63 M/S. Shawon Enterprise 20.59 05/07/2017 14/11/2017 100 20/05/2019
90 IRIDP-2/BGT/MW-118 Maintenance of Mosni Bazar-Bishkhali-Ragudattokati road ( Ch.00m-668m).ID No. 201384073 IRIDP-2 kachua 201384073 0.67 10.64 M/S. Shawon Enterprise 11.16 05/07/2017 17/10/2017 100 20/05/2019
91 IRIDP-2/BGT/MW-119 Maintenance of Mosni Bazar – Bodhobhumi (Rogudottokati Kali Bari-Nimay Asram )road ( Ch.00m-1500m).ID No. 201384085 IRIDP-2 kachua 201384085 1.50 25.05 M/S. Shawon Enterprise 26.27 22/06/2017 15/10/2017 100 20/05/2019
92 IRIDP-2/BGT/DW-125 Improvement of Mogia UP Office-Kathalia Ghat road( Ch.00m-1300m).ID No. 201384058 IRIDP-2 kachua 201384058 1.30 67.18 M/S. Alif Store 70.50 05/07/2017 25/10/2017 100 20/05/2019
93 IRIDP-2/BGT/DW-126 Construction of 1No 4.50mx3.0m Culvert at Ch.1450m on Khalishakhali-Venderkhola-Narandoropur road.ID No. 201384075 IRIDP-2 kachua 201384075 4.50 10.91 M/S. Munna Enterprise 10.39 04/07/2017 20/02/2018 100 20/05/2019
94 IRIDP-2/BGT/DW-127 Construction of 1No 5.0mx3.50m Culvert at Ch.500m on Chairkati-Baraikhali school road ID No. 201384077 IRIDP-2 kachua 201384077 5.00 11.93 M/S. Munna Enterprise 10.88 04/07/2017 11/02/2018 100 20/05/2019
95 IRIDP-2/BGT/DW-128 a) Improvement of Madertola - Larakul road (Ch.00m-891m & link road 70.00m).b) Construction of 1No 4.50mx3.0m Culvert at Ch. 630 on the Same Road.c) Construction of 1No 0.625mx0.60m Culvert at Ch. 293m on the Same Road. d) Construction of 1No 2.0mx2.0m Culvert at Ch. 403m the Same Road. IRIDP-2 kachua 201384067 0.96 7.12 61.49 M/S. Masud Enterprise 64.55 12/07/2017 20/11/2017 100 20/05/2019
96 IRIDP-2/BGT/SDW-130 a) Improvement of Kachua Upazila Central Eidgah-Shahid Zia RNGPS Via Near The H/O Shahid Bhai Road (Ch.00-236m)b) Construction of 1No 5.0mx3.50m Culvert at Ch.365m on the same road IRIDP-2 kachua 201385054 0.24 5.00 38.15 M/S. Ahamed Steel Industries 36.77 26/07/2017 03/01/2019 100 20/05/2019
97 IRIDP-2/BGT/DW-132 Construction of 1No 1.0mx2.00m Culvert at Ch.700m on the Kachua-Gazalia road. ID No. 2012382001 IRIDP-2 kachua 201382001 1.00 7.13 M/S. Tasfia Construction 6.43 31/10/2017 26/11/2017 100 20/05/2019
98 IRIDP-2/BGT/DW-20 (a) Improvement of Laraahat-Lararkul Road from Ch. 00m-286m. (b) Construction of 4.50x3.50m Culvert at Ch. 900m on the Same Road. (c) Construction of 0.625x0.600m Culvert at Ch. 150m on the Same Road. IRIDP-2 kachua 201384045 0.29 5.12 27.46 M/S Masud Enterprise 23.57 18/01/2016 08/08/2016 100 19/05/2019
99 IRIDP-2/BGT/DW-21 Construction of 4.50x3.50m Culvert on Kachua UP-Taleshwer bazar Road at Ch. 5m. IRIDP-2 kachua 201384054 4.50 12.13 M/S. Sohel Construction 9.68 24/01/2016 08/08/2016 100 19/05/2019
100 IRIDP-2/BGT/MW-42 (a)Maintenance of Kachua-Badhal FRB to Tagrakhal river Ghat(Football field) road (ch.1090m - 2430m) (b) Construction of 01 no 2.0m x 2.0m Culvert at Ch:2260m on the same road (c) Construction of 01 no 0.625m x 0.60m Culvert at Ch:2090m on the same road IRIDP-2 kachua 201384014 1.34 2.62 38.83 M/S Shawon Enterprise 37.26 26/05/2016 15/11/2016 100 19/05/2019
101 IRIDP-2/BGT/DW-45 Improvement of Fatehpur bazar-Gopalpur UP-Fultala bazar road (ch.5210m-6153m). IRIDP-2 kachua 201383005 0.94 41.28 M/S Shawon Enterprise 41.12 26/05/2016 01/12/2016 100 19/05/2019
102 IRIDP-2/BGT/DW-46 (a)Improvement of Bakultala-Moshni road (ch.800m-1529m). (b) Construction of 01 no 4.50m x 3.50m Culvert at Ch:959m on the same road (c) Construction of 01 no 0.625m x 0.60m Culvert at Ch:1272m on the same road IRIDP-2 kachua 201384017 0.73 5.12 45.13 M/S Shawon Enterprise 44.83 26/05/2016 28/11/2016 100 19/05/2019
103 IRIDP-2/BGT/DW-47 (a)Improvement of Kachua UP-Talwshwer bazar road (ch.2461m-3190m). (b) Construction of 01 no 4.50m x 3.50m Culvert at Ch:3474m on the same road (c) Construction of 01 no 0.625m x 0.60m Culvert at Ch:2631m on the same road IRIDP-2 kachua 201383009 0.73 5.12 45.12 M/S Shawon Enterprise 41.67 26/05/2016 08/08/2016 100 19/05/2019
104 IRIDP-2/BGT/SDW-52 Improvement of Shibpur - Chadropara Road Ch. (00m-350m) IRIDP-2 kachua 201384078 0.35 30.96 M/S Masud Enterprise 30.96 30/06/2016 27/02/2017 100 19/05/2019
105 IRIDP-2/BGT/DW-70 (a)Improvement of Madertala-Jobai road (Ch.432m - 972m). ID No. 201384019(b) Construction of 1No 2.0mx2.0m Culvert at Ch.931 on the Same Road.(c) Construction of 1No 0.625mx0.60m Culvert at Ch.832 on the Same Road. IRIDP-2 kachua 201384019 0.54 2.62 43.12 M/S. Alif Store 43.11 24/10/2016 19/06/2017 100 19/05/2019
106 IRIDP-2/BGT/DW-71 Improvement of Laraahat-Lararkul road (Ch:290-686m). ID No. 201384045 IRIDP-2 kachua 201384045 0.40 30.76 M/S. Alif Store 30.77 24/10/2016 15/06/2017 100 19/05/2019
107 IRIDP-2/BGT/DW-16 (a) Improvement of Maliporton school-Bishkhali Road from Ch. 00m-408m. (b) Construction of 2.00x2.00m Culvert at Ch. 800m on the Same Road. IRIDP-2 kachua 201384044 0.41 2.00 23.54 M/S Masud Enterprise 23.17 18/01/2016 07/06/2016 100 14/05/2019
108 IRIDP-2/BGT/DW-17 (a)Improvement of B.Andermanik-S.Club-Kuchibaga-Andermanik H. school Road from Ch. 00m-274m. (b) Construction of 4.50x3.50m Culvert at Ch. 950m on the Same Road. (c) Construction of 2.00x2.00m Culvert at Ch. 143m on the Same Road. (d) Construction of 0.625x0.600m Culvert at Ch. 744m on the Same Road. IRIDP-2 kachua 201385014 0.27 7.12 30.43 M/S Masud Enterprise 26.17 18/01/2016 08/06/2016 100 14/05/2019
109 IRIDP-2/BGT/DW-18 (a) Improvement of Guzarpara-Baleshsor River Ghat Road from Ch. 00m-558m. (b) Construction of 4.50x3.50mCulvert at Ch. 1000m on the Same Road. (c) Construction of 2Nos 0.625x0.600m Culvert at Ch. 226m & 322m on the Same Road. IRIDP-2 kachua 201384103 0.56 5.75 42.71 Sardar Jashim 39.00 24/01/2016 07/12/2016 100 14/05/2019
110 IRIDP-2/BGT/DW-19 (a) Improvement of Hazrapara-Tulatola Road from Ch. 1100m-1714m. (b) Construction of 4.50x3.50m Culvert at Ch. 1532m on the Same Road. (c) Construction of 0.625x0.600m Culvert at Ch. 1220m on the Same Road. IRIDP-2 kachua 201385006 0.61 5.12 42.44 M/S Masud Enterprise 39.18 18/01/2016 04/10/2016 100 14/05/2019
111 IRIDP-2/BGT/DW-102 Improvement of Garfa-Girishnagar-Kadamtala Khayaghat road( Ch.00m-1610m).ID No. 201564047 IRIDP-2 mollahat 201564047 1.61 46.22 M/S. Khan Enterprise 42.02 06/06/2017 04/01/2018 100 14/05/2019
112 RIDP-2/BGT/DW-104 (a)Improvement of Atjuri UP-Kadamtala Kheyaghat road( Ch.1287m-2800m).ID No. 201564016(b) Construction of 3No 0.60mx1.125m Culvert at Ch.1352m,1810m& 2465 on the Same Road.(c) Construction of 2No 0.625mx0.60m Culvert at Ch.2535m& 2773m on the Same Road. IRIDP-2 mollahat 201564016 1.51 3.05 86.41 M/S. Kamrul & Brothers 77.77 28/06/2017 20/12/2018 100 14/05/2019
113 IRIDP-2/BGT/DW-105 (a)Improvement of H/o Tofazzel Molla to H/o Monirul Molla at aruakandiroad( Ch.00m-860m).ID No. 201565077(b) Construction of 1No 0.60mx1.125m Culvert at Ch.395 on the Same Road.c) Construction of 2No 0.625mx0.60m Culvert at Ch.549m & 590m on the same road IRIDP-2 mollahat 201565077 0.86 1.85 41.75 MS Deep Bricks 41.57 15/06/2017 12/12/2017 100 14/05/2019
114 IRIDP-2/BGT/DW-108 (a)Improvement of Ghanashampur-Bashbaria village road( Ch.00m-1000m).ID No. 201344092(b) Construction of 2No 0.60mx0.60m Culvert at Ch.62m&120 on the Same Road. IRIDP-2 mollahat 201344092 1.00 1.20 49.40 M/S. M.M Brothers 48.63 17/07/2017 21/06/2018 100 14/05/2019
115 IRIDP-2/BGT/SDW-129 Improvement of Approch road to Laila Azad College from Old Khulna – Dhaka road (Ch.00m-270m).ID No. 201565106 &link T&T Office from Bridge poinr – College Campaus240m& Along bank of Nalua Khal 190.0m IRIDP-2 mollahat 201565106 0.51 41.96 M/S. Khan Enterprise 38.44 20/07/2017 07/03/2018 100 14/05/2019
116 IRIDP-2/BGT/SDW-153 Construction of 01No 2x4.5mx3.0m Culvert at Ch.4090m on Kodalia U.P Office - Aruadehi hat Road.ID No. 201563004 IRIDP-2 mollahat 201563004 9.00 17.32 M/S. Bhai Bhai Enterprise 15.58 04/01/2018 05/03/2018 100 14/05/2019
117 IRIDP-2/BGT/DW-55 Improvement of Burigangni Kalam Kazi- house- Abdul Fakir house road (Ch.00m - 1000m). ID No. 201565093 IRIDP-2 mollahat 201565093 1.00 45.77 S.M Nurul Islam 38.45 10/10/2016 31/07/2018 60 14/05/2019
118 IRIDP-2/BGT/DW-56 Improvement of Rahmotpara-Panipara road (Ch.00m - 1000m). ID No. 201564056 IRIDP-2 mollahat 201564056 1.00 45.77 S.M Nurul Islam 38.06 10/10/2016 31/07/2018 60 14/05/2019
119 IRIDP-2/BGT/DW-101 (a)Improvement of Gatbila Bridge-Rajpat Bil road( Ch.00m-1250m).ID No. 201564030(b) Construction of 1No 0.625mx0.60m Culvert at Ch.100m on the Same Road. IRIDP-2 mollahat 201564030 1.25 0.62 57.43 M/S. Monir Traders 51.77 15/06/2017 02/06/2018 30 14/05/2019
120 RIDP-2/BGT/DW-103 (a)Improvement of Rajpat Chairmanbari – Bishowroad road( Ch.00m-560m).ID No. 201565104(b) Construction of 1No 0.625mx0.60m Culvert at Ch.540m on the Same Road. IRIDP-2 mollahat 201565104 0.56 0.62 28.46 M/S. Monir Traders 25.61 15/06/2017 02/06/2018 60 14/05/2019
121 IRIDP-2/BGT/DW-7 (a)Improvement of Shason Sobed Molla house – Jamai more Road from Ch. 00m-1000m. (b) Construction of 2 Nos 0.60x0.75m Culvert at Ch.300m&900m on the Same Road. IRIDP-2 mollahat 201565079 1.00 1.20 50.00 Shikder Zahidul Islam 42.28 31/01/2016 15/01/2017 100 13/05/2019
122 IRIDP-2/BGT/DW-8 (a) Improvement of Mollahat Nalua UZR-Aruadehi parchim para govt.pry.school Road by BC from Ch. 00m-1106m. (b) Construction of 0.600x0.750m Culvert at Ch. 350m on the Same Road. IRIDP-2 mollahat 201565049 1.11 0.60 50.00 M/S. Mizan Enterprise 42.50 31/01/2016 05/11/2016 100 13/05/2019
123 IRIDP-2/BGT/DW-10 (a) Improvement of Sambagat R&H-Jaria Mitkumra Shardar house mosque Road by BC from Ch. 00m-1000m. (b) Construction of 3Nos 0.600x0.600m Culvert at Ch. 200m, 300m & 350m on the Same Road. IRIDP-2 mollahat 201344067 1.00 1.80 47.17 M/S. Mizan Enterprise 39.62 31/01/2016 02/02/2017 100 13/05/2019
124 IRIDP-2/BGT/DW-49 Improvement of Sarospur Road (Ch. 1200m-2060.5m) IRIDP-2 mollahat 201565008 0.86 47.76 M/S. S.S. Brothers 50.13 21/06/2016 27/03/2017 100 13/05/2019
125 IRIDP-2/BGT/DW-50 (a)Improvement of Dabra-Madartala - Dabra govt.pry.school road (Ch. 00m-1020.50m) (b) Construction of 1 No 0.60x0.75m Culvert at Ch.300m on the Same Road. IRIDP-2 mollahat 201565065 1.02 0.60 48.12 M/S Iqbal & Brothers 39.88 21/06/2016 19/05/2017 100 13/05/2019
126 IRIDP-2/BGT/DW-54 Improvement of Kachna wapda-Sukur daria house road (Ch.00m - 1000m). ID No. 201564099 IRIDP-2 mollahat 201564099 1.00 45.77 M/S. Molla Enterprise 38.01 29/09/2016 28/08/2017 100 13/05/2019
127 IRIDP-2/BGT/DW-25 (a) Improvement of Holdibunia (Baliar more) - Burburia via Malgazi-Hid office Road from Ch. 755m-1365m. (b) Construction of 3 Nos 1.00x1.00m Culvert at Ch. 965m, 1083m & 1337m on the Same Road. IRIDP-2 mongla 201584044 0.61 3.00 32.10 M/S A.R. Enterprise 28.74 26/01/2016 13/10/2016 100 21/05/2019
128 IRIDP-2/BGT/DW-37 (a) Improvement of Digiraj – Jhalmalia dhigi via Burirdanga union parishad road (Ch.2500m - 4040m). (b) Construction of 1No 1.0mx1.0m Culvert at Ch.3390m on the Same Road. IRIDP-2 mongla 201582007 1.54 1.00 117.62 M/S. Shovo Enterprise 100.60 25/02/2016 30/12/2017 100 21/05/2019
129 IRIDP-2/BGT/DW-63 (a) Improvement of Shabermet (Vogomaner more) – Lakhmikhali (shadhur bare) road (Ch:00-1700m). ID No. 201584039(b) Construction of 3No 1.0mx1.0m Culvert at Ch.10m,549m,718m & 01 no 2.0mx 2.0 m Culvert at Ch.1620m on the Same Road. IRIDP-2 mongla 201584039 1.70 5.00 117.01 M/S. Mohiuddin Ahmed 122.80 22/11/2016 31/12/2017 100 21/05/2019
130 IRIDP-2/BGT/DW-89 (a) Improvement of Mongla - Chatterhat GC at Tatibunia --Burburia School..Road ( Ch.00m-3200m).ID No. 201584017(b) Construction of 4No 1.0mx1.0m Culvert at Ch. 2395m,2550m,2600m&2825m on the Same Road. IRIDP-2 mongla 201584017 3.20 4.00 131.36 M/S. Bhai Bhai Enterprise 137.92 15/01/2017 20/03/2018 100 21/05/2019
131 IRIDP-2/BGT/DW-90 (a) Improvement of Digraj bazar - Madurpalta Govt. Pond Road. ( Ch.00m-1307m).ID No. 201584094(b) Construction of 2No 1.0mx1.0m Culvert at Ch. 105m&135m on the Same Road. IRIDP-2 mongla 201584094 1.31 2.00 57.39 57.39 15/01/2017 26/06/2017 100 21/05/2019
132 IRIDP-2/BGT/DW-150 Improvement of Chandpai UP-Chila hat road (Ch.00m-250m).ID No. 201583001 0 IRIDP-2 mongla 201583001 0.25 2091.00 M/S. Bhai Bhai Enterprise 21.28 04/01/2018 06/10/2018 100 21/05/2019
133 IRIDP-2/BGT/DW-149 (a)Improvement of Haldibunia-Dasherkhando road (Ch.00m-1750m).ID No. 201584050(b) Construction of 05No 1.0mx1.0m Culvert at Ch.142m,175m,1100m,1326m &1415m on the Same Road. IRIDP-2 mongla 201584050 1.75 5.00 99.00 M/S. Iqbal Enterprise 103.27 18/03/2018 18/10/2018 100 21/05/2019
134 IRIDP-2/BGT/DW-24 (a) Improvement of Sundarban UP - Madurpalta Bazar Road from Ch. 1900m-3000m. (b) Construction of 4 Nos 1.00x1.00m Culvert at Ch. 1600m, 1915m, 2105m & 2 240m on the Same Road. IRIDP-2 mongla 201583005 1.10 4.00 49.09 M/S. Sohel Construction 44.68 17/01/2016 08/08/2016 100 20/05/2019
135 IRIDP-2/BGT/DW-28 (a) Improvement of Pollerhat GC - Chingrakhali UP-Zianagar RHD (Morel Part) (UP to UP Office) Road from Ch. 3629m-4110m & 5143m-5662m. (b) Construction of Single vent 4.0x4.0m Culvert at Ch. 1750m on the Same Road. (c) Construction of 4Nos 0.625x0.600m Culvert at Ch. 950m, 2370m, 2700m & 3250m on the Same Road. IRIDP-2 morrelganj 201602006 1.00 6.50 5091.00 M/S. Moon Enterprise 44.42 26/01/2016 30/08/2017 100 22/05/2019
136 IRIDP-2/BGT/DW-29 Improvement of Chingrakhali GC - Daibajnahati GC Road from Ch. 2794m-6734m & 9200m-9420m. IRIDP-2 morrelganj 201602002 4.16 226.62 M/S Jharna Enterprise 206.11 26/01/2016 09/04/2018 100 22/05/2019
137 IRIDP-2/BGT/DW-30 Improvement of Amtoli Madrasa - Wapda Embankment via South Kumarkhali RNGPS Road from Ch. 850m-3000m. IRIDP-2 morrelganj 201605118 2.15 48.79 M/S. Chan Enterprise 45.13 06/03/2016 08/08/2016 100 22/05/2019
138 IRIDP-2/BGT/DW-38 Improvement of Herma Mondal bari Aurjon bahor Shimna road (Ch.00m - 2500m). IDNo.201605160 IRIDP-2 morrelganj 201605160 2.50 85.97 M/S. S.S. Brothers 90.27 12/05/2016 24/08/2016 100 22/05/2019
139 IRIDP-2/BGT/SDW-39 Improvement of Shrenikhali (Munshir hat) – Sonakhali bazar road (Ch.2200m - 2900m). IDNo.201604161 IRIDP-2 morrelganj 201604161 0.70 18.89 M/S Monir Bricks Enterprise 16.24 05/05/2016 10/11/2016 100 22/05/2019
140 IRIDP-2/BGT/DW-65 (a) Improvement of East Chandripur Badsha Mia Shop-Dakuar Khal bridge via Ramchandrapur Bazar Road (ch.1500m-2863m)ID No. 201605050(b) Construction of 2No 0.625mx0.60m Culvert at Ch.1635m & 2026m on the Same Road. IRIDP-2 morrelganj 201605050 1.36 1.25 13.47 M/S. Masum Billah Enterprise 13.47 16/10/2016 11/04/2019 100 22/05/2019
141 IRIDP-2/BGT/DW-66 (a) Improvement of Nurullahpur at Sardar Bari-Keshorampur GPS Road (ch.00m-1360m)ID No. 201605038(b) Construction of 2No 1.60mx1.60m Culvert at Ch.200m & 1500m on the Same Road. IRIDP-2 morrelganj 201605038 1.36 3.20 67.29 Sardar Jashim 65.24 06/10/2016 30/12/2017 100 22/05/2019
142 IRIDP-2/BGT/DW-26 (a) Improvement of Putikhali U.P - Panchakaran UP via Gazalia bazar from Ch. 3100m-5160m.&5480m-5500m. (b) Construction of 2Nos 0.90x0.90m Culvert at Ch. 4475m & 5225m on the Same Road. IRIDP-2 morrelganj 201603021 2.08 1.80 81.35 M/S. S.S. Brothers 75.01 03/03/2016 07/08/2016 100 21/05/2019
143 IRIDP-2/BGT/DW-27 (a) Improvement of Balvhadrapur RHD - Bishkhali GPS Road from Ch. 00m-1170m. (b) Construction of 1No 1.60x1.60m Culvert at Ch. 760m on the Same Road. (c) Construction of 2Nos 4.00x4.0m Culvert at Ch. 157m & 1174m on the Same Road. IRIDP-2 morrelganj 201604058 1.17 9.60 86.24 M/S Shahadat Enterprise 72.98 08/02/2016 25/09/2016 100 21/05/2019
144 IRIDP-2/BGT/DW-61 Improvement of Maderdia GPS – Lunch ghat road (Ch.00m - 520m). ID No. 201735086 IRIDP-2 rampal 201735086 0.52 27.72 M/S. Habib Enterprise 29.10 06/10/2016 28/12/2017 100 21/05/2019
145 IRIDP-2/BGT/DW-62 Improvement of Sarafput – Durgapur – Khayaghat road (Ch.1310m - 1975m). ID No. 201734074 IRIDP-2 rampal 201734074 0.67 31.65 M/S. Habib Enterprise 33.24 06/10/2016 30/12/2017 100 21/05/2019
146 IRIDP-2/BGT/DW-85 Improvement of Pipulbunia-Kalakher Ber Westpara Road ( Ch.1020m-2670m).ID No. 201734001 IRIDP-2 rampal 201734001 1.65 57.02 M/S. Amirun Enterprise 59.85 29/01/2017 05/03/2019 100 21/05/2019
147 IRIDP-2/BGT/DW-86 Improvement of Telikhali-Baruipara Road ( Ch.1150m-3300m).ID No. 201734032 & Link 342.0m IRIDP-2 rampal 201734032 2.49 85.64 M/S. Bhai Bhai Enterprise 89.92 15/01/2017 10/12/2017 100 21/05/2019
148 IRIDP-2/BGT/DW-88 (a) Improvement of Bujbunia bazar-Sonakur bazar G.C.R.Road ( Ch.00m-1600m).ID No. 201734067b) Construction of 1 No 0.625mx0.600m Culvert at ch. 262m on the Same Road. IRIDP-2 rampal 201734067 1.60 0.62 51.97 M/S. Amirun Enterprise 54.55 29/01/2017 24/11/2017 100 21/05/2019
149 IRIDP-2/BGT/DW-135 Improvement of Rajnagor UP via Rajnagor Junior High School-Chalkgona Kheyaghat Road (Ch.2450m-3500m).ID No. 201734037 IRIDP-2 rampal 201734037 1.05 44.94 M/S. Alif Traders 44.49 06/12/2018 20/03/2019 100 21/05/2019
150 IRIDP-2/BGT/DW-136 Improvement of Mollikerber Mosque - Montu Tallukder House Road (Ch.00m-398m).ID No. 201735101 IRIDP-2 rampal 201735101 0.40 38.39 M/S. Jhorna Enterprise 40.30 05/04/2018 28/11/2018 100 21/05/2019
151 IRIDP-2/BGT/DW-137 Improvement of Dhakin Mallikerber Khayghat-Daliprara Road (Ch.00m-390m).ID No. 201734088 IRIDP-2 rampal 201734088 0.39 11.21 M/S. Bebakanandho Enterprise 11.74 08/08/2018 05/12/2018 100 21/05/2019
152 IRIDP-2/BGT/DW-138 (a)Improvement of Tangramari-Garer KhalRoad (Ch.260m-1500m).ID No. 201734112(b) Construction of 02No 0.625mx0.60m Culvert at Ch.900m&1110m on the Same Road. IRIDP-2 rampal 201734112 1.24 1.25 68.31 M/S. Shovo Enterprise 68.29 04/01/2018 06/05/2018 100 21/05/2019
153 IRIDP-2/BGT/DW-139 (a)Improvement of Horishova Mondir - Bedan babu House (Orabunia) road (Ch.00m-450m).ID No. 201735188b) Construction of 01No 0.625mx0.60m Culvert at Ch.700m on the Same Road. IRIDP-2 rampal 201735188 0.45 0.62 16.07 M/S. Sohel Enterprise 16.72 08/08/2018 20/11/2018 100 21/05/2019
154 IRIDP-2/BGT/DW-142 Improvement of Sakurhat zame mosque -Saguna uttaarpara mondir road (Ch.1054m-1640m).ID No. 201734028 IRIDP-2 rampal 201734028 0.59 42.60 M/S. Shovo Enterprise 42.57 04/01/2018 15/03/2018 100 21/05/2019
155 IRIDP-2/BGT/DW-143 Improvement of Foyla hat-Chaksree GC road (Ch.00m-870m).ID No. 201732004 IRIDP-2 rampal 201732004 0.87 19.37 M/S. Shovo Enterprise 19.35 04/06/2018 15/03/2018 100 21/05/2019
156 IRIDP-2/BGT/DW-145 (a)Improvement of Vaga Betkata Kali Mondir- Babu Pa Hous via Betkata Hori Mondir road (Ch.00m-775m).ID No. 201735139(b) Construction of 01No 0.625mx0.60m Culvert at Ch.700m on the Same Road. IRIDP-2 rampal 201735139 0.78 0.62 34.53 M/S. Shovo Enterprise 34.50 04/01/2018 12/03/2018 100 21/05/2019
157 IRIDP-2/BGT/DW-147 Improvement of Gilatale G.C-Bhospatia UP road (Ch.00m-122m).ID No. 201733002 IRIDP-2 rampal 201733002 0.12 21.53 M/S. Shovo Enterprise 21.51 31/12/2017 10/11/2018 100 21/05/2019
158 IRIDP-2/BGT/DW-148 Improvement of Kundopara Durga Mondir- Shreefaltola Bottola road (Ch.00m-660m).ID No. 201735070 IRIDP-2 rampal 201735070 0.64 46.20 M/S Khandakar Brothers 45.90 08/04/2018 10/04/2019 100 21/05/2019
159 IRIDP-2/BGT/DW-87 Improvement of Mongla-Mithakhali-Mollikerber Road (Rampal portion)Road ( Ch.7055m-8250m).ID No. 201732009 IRIDP-2 rampal 201732009 1.20 57.08 M/S. Amirun Enterprise 59.92 29/01/2017 19/12/2018 100 21/05/2019
160 IRIDP-2/BGT/DW-60 Improvement of Srifaltala new market – Veternary hospital via sarner field road (Ch.00m - 1900m). ID No. 201734139 IRIDP-2 rampal 201734139 1.90 146.56 M/S. Himel Enterprise 130.42 10/10/2016 0 21/05/2019
161 IRIDP-2/BGT/DW-140 Improvement of Foyla Bazar Kundo Para moar - Biman Bondor road (Ch.610m-875m).ID No. 201735124 IRIDP-2 rampal 201735124 0.27 11.78 M/S. Molla Enterprise 11.30 08/02/2018 14/11/2018 40 21/05/2019
162 IRIDP-2/BGT/DW-141 (a)Improvement of Bhojpatia Uttar Para Road (Ch.00m-750m).ID No. 201735016b) Construction of 01No 0.625mx0.60m Culvert at Ch.650m on the Same Road. IRIDP-2 rampal 201735016 0.75 0.62 38.42