1
|
CIB-Bag-W-22
|
Const. of 200m long PSC Girder Bridge over Madar Tola Khal river on Snaitola-Katakhali Bazar road at Ch. 4400m under Mongla Upazila, Dist. Bagerhat
|
CIBRR
|
mongla
|
201583003
|
|
200.00
|
100
|
2027.69
|
AK- MA ( JV)
|
2250.26
|
12/02/2018
|
19/02/2018
|
30/11/2022
|
100
|
2142.71
|
100
|
05/01/2025
|
|
2
|
CIB-Bag-W-116
|
Const. of 360m long PC Girder Bridge over Daudkhali river on Rampal-Bashtoli UP Road at Ch. 2131m under Rampal Upazila, Dist. Bagerhat
|
CIBRR
|
rampal
|
201733006
|
|
360.00
|
25
|
5336.97
|
MAX INFRASTRUCTURE LTD
|
5759.52
|
19/06/2022
|
26/06/2022
|
25/06/2025
|
40
|
1452.29
|
25
|
05/01/2025
|
|
3
|
CRMIDP/BGRH/W-132
|
Talesshor Hat
|
CRMIDP
|
kachua
|
|
|
|
81
|
258.00
|
M/S Atahar Enterprise
|
257.51
|
02/06/2020
|
|
30/06/2022
|
90
|
208.39
|
81
|
25/07/2022
|
|
4
|
CRMIDP/BGRH/W-133
|
Chunkhola Bazar
|
CRMIDP
|
mollahat
|
|
|
|
22
|
258.00
|
BCSK(JV)
|
214.00
|
22/04/2021
|
|
28/09/2022
|
25
|
46.61
|
22
|
25/07/2022
|
|
5
|
GSIDP/BGT/DW-1
|
Improvement of Ranjitpur High School Field in Khanpur Union Under Sadar Upazila, Bagerhat.[Latitude:22.7077 Longitude: 89.6419]
|
GSIDP
|
bagerhat-s
|
|
|
|
|
5.46
|
MS. Metu Enterprise
|
5.18
|
|
30/05/2018
|
14/01/2019
|
100
|
|
|
|
|
6
|
GSIDP/BGT/DW-2
|
Improvment of Ranjitpur Gucchagram Jam-e-Mosque under Khanpur Union, Sadar Upazila, Dist.Bagerhat. [Latitude:22.6488 Longitude: 89.6975]
|
GSIDP
|
bagerhat-s
|
|
|
|
|
11.90
|
Wasim Ul Axim
|
11.30
|
|
27/05/2018
|
11/01/2019
|
0
|
|
|
|
|
7
|
GSIDP/BGT/DW-3
|
Improvement of Gobordia Graveyard Under Karapara Union, Under Sadar Upazila, Dist.Bagerhat. .[Latitude:22.6469 Longitude: 89.7894]
|
GSIDP
|
bagerhat-s
|
|
|
|
|
11.10
|
MS. MD. Tarequzzama
|
10.55
|
|
15/05/2018
|
30/12/2018
|
0
|
|
|
|
|
8
|
GSIDP/BGT/DW-4
|
Improvement of Sugandhi Madrasha attached Mosque Union Rakhalgachi, Under Sadar Upazila, Dist. Bagerhat.Latitude:22.6722 Longitude: 89.7083]
|
GSIDP
|
bagerhat-s
|
|
|
|
|
23.01
|
MS.Joy Enterprise
|
21.86
|
|
30/05/2018
|
14/01/2019
|
0
|
|
|
|
|
9
|
GSIDP/BGT/DW-5
|
Improvement of Boundary wall at Kachua Cental Graveyard Under Kachua UP Kachua Upazila, Dist. Bagerhat.[Latitude:22.65082 Longitude: 89.88272]
|
GSIDP
|
kachua
|
|
|
|
|
10.00
|
Ms.Metu Enterprise
|
9.50
|
|
27/05/2018
|
10/01/2019
|
10
|
|
|
|
|
10
|
GSIDP/BGT/DW-6
|
Improvement of Tengrakhali-Hazrapara Jame Mosque Under Kachua UP, Kachua Upazila, Dist.Bagerhat.[Latitude:22.54874 Longitude: 89.89636].
|
GSIDP
|
kachua
|
|
|
|
|
10.00
|
MS. Metu Enterprise
|
9.90
|
|
02/07/2018
|
01/01/2019
|
50
|
|
|
|
|
11
|
GSIDP/BGT/DW-7
|
Improvement of Shailkathi Jame Mosque Under Dopakhali UP Kachua Upazila, Dist. Bagerhat.[Latitude:22.71012 Longitude: 89.86205].
|
GSIDP
|
kachua
|
|
|
|
|
5.00
|
MS. Metu Enterprise
|
4.75
|
|
21/06/2018
|
04/02/2019
|
100
|
|
|
|
|
12
|
GSIDP/BGT/DW-8
|
Improvement of of Poschim Moghia Jame Mosque Under Moghia UP, Kachua Upazila, Dist. Bagerhat.[Latitude:22.67658 Longitude: 89.86863]
|
GSIDP
|
kachua
|
|
|
|
|
5.00
|
M/S Rumi Enterprise
|
4.75
|
|
21/06/2018
|
04/02/2019
|
100
|
|
|
|
|
13
|
GSIDP/BGT/DW-9
|
Improvement of Gimatakhati-Shoshanghat Under Kachua UP, Kachua Upazila, Dist. Bagerhat.[Latitude:22.71012 Longitude: 89.86205]
|
GSIDP
|
kachua
|
|
|
|
|
5.00
|
MS. Metu Enterprise,
|
4.91
|
|
27/05/2018
|
10/01/2019
|
100
|
|
|
|
|
14
|
GSIDP/BGT/DW-10
|
Improvement of Shibpur Mondir Under Raripara UP, Kachua Upazila, Dist. Bagerhat. .[Latitude:22.67829 Longitude: 89.85205]
|
GSIDP
|
kachua
|
|
|
|
|
10.00
|
Md.Nazrul Islam
|
9.50
|
|
15/05/2018
|
30/12/2018
|
35
|
|
|
|
|
15
|
GSIDP/BGT/DW-11
|
Improvement of Moshni Surbojonin Durga Mondir Under Badal UP, Kachua Upazila, Dist. Bagerhat.[Latitude:22.59794 Longitude: 89.87902].
|
GSIDP
|
kachua
|
|
|
|
|
5.00
|
MS.Rime Enterprise
|
4.75
|
|
20/05/2018
|
03/01/2019
|
100
|
|
|
|
|
16
|
GSIDP/BGT/DW-12
|
Improvement of Boro Andermanik Surbojonin Durga Mondir Under Moghia UP, Kachua Upazila, Dist Bagerhat.[Latitude:22.68121 Longitude: 89.85205]
|
GSIDP
|
kachua
|
|
|
|
|
5.00
|
MS. Joy Enterprise
|
4.75
|
|
27/05/2018
|
10/01/2019
|
100
|
|
|
|
|
17
|
GSIDP/BGT/DW-13
|
Improvement of of Rampal Central Mondir Under Rampal Sadar, Under Rampal Upazila, Dist.Bagerhat.[Latitude:22.5586124 Longitude: 89.6623701]
|
GSIDP
|
rampal
|
|
|
|
|
6.46
|
MS. Metu Enterprise
|
6.78
|
|
18/06/2018
|
17/12/2018
|
100
|
|
|
|
|
18
|
GSIDP/BGT/DW-14
|
Improvement of Gilatola Purbopara Jame Mosque Under Bashtoli Union, Rampal Upazila, Dist.Bagerhat. [Latitude:22.5806672 Longitude: 89.7023304]
|
GSIDP
|
rampal
|
|
|
|
|
6.92
|
MS. Metu Enterprise
|
7.27
|
|
18/06/2018
|
17/12/2018
|
100
|
|
|
|
|
19
|
GSIDP/BGT/DW-15
|
Improvement of Rampal Central Crematorium Under Rampal Sadar Union Under Rampal Upazila, Dist.Bagerhat. [Latitude:22.58185667 Longitude: 89.65672500]
|
GSIDP
|
rampal
|
|
|
|
|
7.18
|
MS. Metu Enterprise
|
7.54
|
|
18/06/2018
|
17/12/2018
|
0
|
|
|
|
|
20
|
IRIDP-2/BGT/MW-92
|
Maintenance of Afra-Komorpur CARE Road (Ch. 00m-2500m)
|
IRIDP-2
|
bagerhat-s
|
201084049
|
2.50
|
|
|
46.71
|
M/S Shovo Enterprise
|
41.79
|
06/03/2017
|
|
05/04/2017
|
100
|
|
|
20/05/2019
|
|
21
|
IRIDP-2/BGT/MW-93
|
Maintenance of Rakhalgachi UP-Chulkathi bazar via Ranjeetpur road (Ch. 00m-1000m)
|
IRIDP-2
|
bagerhat-s
|
201084074
|
1.00
|
|
|
15.96
|
Md. Shariful Alam
|
13.81
|
06/03/2017
|
|
10/12/2017
|
100
|
|
|
20/05/2019
|
|
22
|
IRIDP-2/BGT/MW-94
|
Maintenance of Bottala bazar (Joygaci)-Kachua UP via Taleswar bazar (sadar portion) from Ch. Road (Ch.00m-2472m).
|
IRIDP-2
|
bagerhat-s
|
201084075
|
2.48
|
|
|
44.30
|
M/S. Alif Store
|
39.31
|
26/02/2017
|
|
08/05/2017
|
100
|
|
|
20/05/2019
|
|
23
|
IRIDP-2/BGT/SDW-98
|
(a) Improvement of Jattapur Rathkhola_Jattrapur bridge via annodothakur Moinder Road (Ch.00m-1000m.(b) Construction of 1No 0.625mx0.60m Culvert at Ch. 93m on the same road.
|
IRIDP-2
|
bagerhat-s
|
201085261
|
1.00
|
0.62
|
|
46.03
|
M/S. E.M Enterprise
|
47.99
|
07/05/2017
|
|
22/02/2018
|
100
|
|
|
20/05/2019
|
|
24
|
IRIDP-2/BGT/MW-110
|
Maintenance of Morga bazar-Bagerhat-Rupsha D.C.Road( Ch.700m-1700m).ID No. 201084034
|
IRIDP-2
|
bagerhat-s
|
201084034
|
1.00
|
|
|
20.78
|
M/S. Makka Traders
|
21.77
|
04/07/2017
|
|
04/12/2017
|
100
|
|
|
20/05/2019
|
|
25
|
IRIDP-2/BGT/MW-111
|
Maintenance of Karapara UP office - Karapara bazar via Magnitala bazar road ( Ch.00m-870m & 1167m-1994m).ID No. 201083022
|
IRIDP-2
|
bagerhat-s
|
201083022
|
1.70
|
|
|
27.76
|
M/S. Alif Store
|
29.12
|
05/07/2017
|
|
20/11/2017
|
100
|
|
|
20/05/2019
|
|
26
|
IRIDP-2/BGT/MW-112
|
Maintenance of Kandapara GC(Parnowapara)-Betkhali bazar-Taleswar bazar road( Ch.00m-1000m & 1780m-2485m).ID No. 201084019
|
IRIDP-2
|
bagerhat-s
|
201084019
|
1.71
|
|
|
28.97
|
M/S. Avanova Enterprise
|
30.18
|
22/08/2017
|
|
30/12/2018
|
100
|
|
|
20/05/2019
|
|
27
|
IRIDP-2/BGT/MW-113
|
Maintenance of Syedpur Madrasha road ( Ch.00m-1283m).ID No. 201085008
|
IRIDP-2
|
bagerhat-s
|
201085008
|
1.28
|
|
|
20.28
|
SK. Idrish Ali
|
20.23
|
22/06/2017
|
|
12/11/2017
|
100
|
|
|
20/05/2019
|
|
28
|
IRIDP-2/BGT/MW-114
|
Maintenance of Dema UP office - Hedayetpur bazar road ( Ch.00m-3207m).ID No. 201083021
|
IRIDP-2
|
bagerhat-s
|
201083021
|
3.21
|
|
|
48.67
|
M/S. Sohel Construction
|
50.96
|
21/06/2017
|
|
27/02/2018
|
100
|
|
|
20/05/2019
|
|
29
|
IRIDP-2/BGT/DW-122
|
Construction of 1No 3.0mx3.0m Culvert at Ch.1050m on Bishnapur UP-Bakerganj bazar Road. ID No. 201083007
|
IRIDP-2
|
bagerhat-s
|
201083007
|
|
3.00
|
|
16.26
|
M/S. Munna Enterprise
|
15.49
|
04/07/2017
|
|
09/04/2018
|
100
|
|
|
20/05/2019
|
|
30
|
IRIDP-2/BGT/DW-123
|
Construction of 1No 3.0mx3.0m Culvert at Ch.800m on Sugandi Primary schol-Late Dr. Abu syed H/O road ID No. 201085076
|
IRIDP-2
|
bagerhat-s
|
201085076
|
|
3.00
|
|
9.57
|
M/S. Rahamat Traders
|
9.40
|
12/06/2017
|
|
18/04/2018
|
100
|
|
|
20/05/2019
|
|
31
|
IRIDP-2/BGT/DW-124
|
Construction of 1No 3.0mx3.0m Culvert at Ch.808m on Madrasha bazar-Bisnupur via Fathapur GPS road. ID No. 201085278
|
IRIDP-2
|
bagerhat-s
|
201085278
|
|
3.00
|
|
9.57
|
M/S. Rahamat Traders
|
9.40
|
12/06/2017
|
|
30/07/2018
|
100
|
|
|
20/05/2019
|
|
32
|
IRIDP-2/BGT/SDW-131
|
Improvement of Koramara Moddapara Road (Ch.00m-271m).ID No. 201085322
|
IRIDP-2
|
bagerhat-s
|
201085322
|
0.27
|
|
|
26.03
|
M/S. Alif Store
|
24.44
|
08/11/2017
|
|
12/04/2018
|
100
|
|
|
20/05/2019
|
|
33
|
IRIDP-2/BGT/SMW-157
|
Maintenance of Bade Karapara Southpara Road (Ch.00-623m)
|
IRIDP-2
|
bagerhat-s
|
201085080
|
0.62
|
|
|
8.62
|
M/S. Mijan Enterprise
|
9.05
|
07/03/2018
|
|
10/10/2018
|
100
|
|
|
20/05/2019
|
|
34
|
IRIDP-2/BGT/DW-44
|
Improvement of Khagra Ghat Primary School-Sarkardanga BWDB road (ch.00m-1000m).
|
IRIDP-2
|
bagerhat-s
|
201084053
|
1.00
|
|
|
46.02
|
M/S. Sohel Construction
|
41.64
|
26/05/2016
|
|
01/12/2016
|
0
|
|
|
20/05/2019
|
|
35
|
IRIDP-2/BGT/DW-120
|
Improvement of Rupsha Bagerhat R& H-Provach shel House-Rakhalgachi bazar via Molla bari road ( Ch.1440m-2550m).ID No. 201085208
|
IRIDP-2
|
bagerhat-s
|
201085208
|
1.11
|
|
|
62.64
|
M/S. Mizan Enterprise
|
65.69
|
22/08/2017
|
|
29/05/2018
|
45
|
|
|
20/05/2019
|
|
36
|
IRIDP-2/BGT/DW-121
|
Improvement of Khudra chaksree pry. School-C&B bazar via Gobinda mondir road ( Ch.00m-1250m).ID No. 201085123
|
IRIDP-2
|
bagerhat-s
|
201085123
|
1.25
|
|
|
66.81
|
M/S. Mizan Enterprise
|
70.06
|
22/08/2017
|
|
29/05/2018
|
60
|
|
|
20/05/2019
|
|
37
|
IRIDP-2/BGT/MW-40
|
Maintenance of Mathabhanga R & H-Sukdara bus stand via Sunagar from road (ch.00m-850m).
|
IRIDP-2
|
bagerhat-s
|
201084005
|
0.85
|
|
|
16.70
|
M/S. Sohel Construction
|
15.30
|
26/05/2016
|
|
31/12/2016
|
100
|
|
|
19/05/2019
|
|
38
|
IRIDP-2/BGT/MW-41
|
Maintenance of Paschim Shara BWD-Chaksree road (ch.00m - 2000m).
|
IRIDP-2
|
bagerhat-s
|
201084012
|
2.00
|
|
|
38.21
|
M/S. Sohel Construction
|
35.05
|
26/05/2016
|
|
11/12/2016
|
100
|
|
|
19/05/2019
|
|
39
|
IRIDP-2/BGT/DW-43
|
Improvement of Madrasha Bazar - Bishnupur via Fatapur GPS road (ch.00m-750m).
|
IRIDP-2
|
bagerhat-s
|
201085278
|
0.75
|
|
|
33.48
|
M/S. Sohel Construction
|
33.40
|
26/05/2016
|
|
02/01/2017
|
100
|
|
|
19/05/2019
|
|
40
|
IRIDP-2/BGT/DW-68
|
(a)Improvement of Khanpur UP (at polerhat)-Utkul bazar via Sreeghat bazar.road (Ch.4240m - 5905m). ID No. 201083002(b) Construction of 3No 0.625mx0.60m Culvert at Ch.885m,1032m&1170 on the Same Road.
|
IRIDP-2
|
bagerhat-s
|
201083002
|
1.67
|
1.87
|
|
102.55
|
M/S. Habib Enterprise
|
107.65
|
06/11/2016
|
|
29/04/2018
|
100
|
|
|
19/05/2019
|
|
41
|
IRIDP-2/BGT/DW-69
|
(a)Improvement of Keshobpur-Chargram-Kondola-Talswar road (Ch.4100m - 5350m). ID No. 201085013(b) Construction of 1No 0.625mx0.60m Culvert at Ch.4950 on the Same Road.
|
IRIDP-2
|
bagerhat-s
|
201085013
|
1.25
|
0.62
|
|
56.98
|
M/S. Bhuiyan Construction
|
56.96
|
23/10/2016
|
|
18/09/2017
|
100
|
|
|
19/05/2019
|
|
42
|
IRIDP-2/BGT/DW-12
|
(a) Improvement of West Saera bazar-Sreeghat bazar via sadullahpur Road from Ch. 00m-1000m. (b) Construction of 2Nos 0.600x0.625m Culvert at Ch. 100m & 285m on the Same Road. (c) Construction of 3.00x3.00mCulvert at Ch. 620m on the Same Road.
|
IRIDP-2
|
bagerhat-s
|
201084069
|
1.00
|
4.20
|
|
61.91
|
M/S. Sohel Construction
|
52.91
|
17/01/2016
|
|
08/08/2016
|
100
|
|
|
14/05/2019
|
|
43
|
IRIDP-2/BGT/DW-13
|
(a) Improvement of Bishnapur UP-Bakerganj bazar Road from Ch. 6670m-7670m. (b) Construction of 0.600x0.625m Culvert at Ch. 7513m on the Same Road.
|
IRIDP-2
|
bagerhat-s
|
201083007
|
1.00
|
0.60
|
|
79.96
|
Sardar Jashim
|
69.03
|
24/01/2016
|
|
08/12/2016
|
100
|
|
|
14/05/2019
|
|
44
|
IRIDP-2/BGT/DW-14
|
(a) Improvement of Hakimpur Pry. School-Chandromahol Road from Ch. 00m-1000m. (b) Construction of 0.600x0.625m Culvert at Ch. 760m on the Same Road.
|
IRIDP-2
|
bagerhat-s
|
201085191
|
1.00
|
0.60
|
|
50.54
|
M/S Jharna Enterprise
|
43.46
|
27/01/2016
|
|
08/08/2016
|
100
|
|
|
14/05/2019
|
|
45
|
IRIDP-2/BGT/DW-15
|
(a) Improvement of Jattrapur UP-Baroipara bazar via Baghdia Road from Ch. 1650m-2900m. (b) Construction of 3Nos 0.600x0.625m Culvert at Ch. 1670m, 1925m & 2490m on the Same Road.
|
IRIDP-2
|
bagerhat-s
|
201084072
|
1.25
|
1.80
|
|
68.50
|
M/S. Moon Enterprise
|
58.52
|
24/01/2016
|
|
27/10/2016
|
100
|
|
|
14/05/2019
|
|
46
|
IRIDP-2/BGT/MW-97
|
Maintenance of Durgapur RHD-Khaserhat GC-Kaligonj GC-Gazalia GC (CHT. Part) road (Ch.1070m-3710m)
|
IRIDP-2
|
chitalmari
|
201142003
|
2.64
|
|
|
94.32
|
M/S. F.K Trade
|
79.43
|
06/03/2017
|
|
15/07/2017
|
100
|
|
|
14/05/2019
|
|
47
|
IRIDP-2/BGT/DW-99
|
(a) Improvement of Mollahat-Borabaria-Kananchak Road ( Ch.5556m-6302m).(b) Construction of 1No 0.625mx0.60m Culvert at Ch. 5775m on the Same Road.
|
IRIDP-2
|
chitalmari
|
201142011
|
0.74
|
0.62
|
|
51.18
|
MS Deep Bricks
|
50.12
|
30/05/2017
|
|
03/06/2018
|
100
|
|
|
14/05/2019
|
|
48
|
IRIDP-2/BGT/DW-100
|
Improvement of Doriumajuri more - Doriumajuri Kali Mondir road( Ch.00m-750m).ID No. 201145117
|
IRIDP-2
|
chitalmari
|
201145117
|
0.75
|
|
|
59.20
|
M/S. Alif Store
|
53.28
|
30/05/2017
|
|
01/11/2017
|
100
|
|
|
14/05/2019
|
|
49
|
IRIDP-2/BGT/DW-4
|
(a) Improvement of Barabaria- Badamtala-Daluagunia Road from Ch. 1000m-2030m. (b) Construction of 5 Nos 0.625x0.600m Culvert at Ch. 1270m, 1490m, 1755m, 1825m & 2010m on the Same Road.
|
IRIDP-2
|
chitalmari
|
201144033
|
1.03
|
3.12
|
|
51.91
|
M/S. F.K Trade Link
|
44.36
|
24/01/2016
|
|
08/08/2016
|
100
|
|
|
14/05/2019
|
|
50
|
IRIDP-2/BGT/DW-1
|
(a) Improvement of Bhannabara -Sonakhali Road from Ch. 00m-850m. (b) Construction of 3 Nos 0.625x0.600m Culvert at Ch. 320m, 604m & 763m on the Same Road.
|
IRIDP-2
|
chitalmari
|
201145084
|
0.85
|
1.87
|
|
44.40
|
M/S. F.K Trade Link
|
39.50
|
24/01/2016
|
|
28/07/2016
|
100
|
|
|
13/05/2019
|
|
51
|
IRIDP-2/BGT/DW-2
|
(a) Improvement of Shampara-Kudari Via Panchpara Hat Road from Ch. 00m-1000m. (b) Construction of 2 Nos 0.625x0.600m Culvert at Ch. 491m & 626m on the Same Road. (c) Construction of 3 vent 4.00x4.00m Culvert at Ch. 312m on the Same Road.
|
IRIDP-2
|
chitalmari
|
201144033
|
1.00
|
13.25
|
|
78.07
|
M/S. F.K Trade Link
|
66.71
|
24/01/2016
|
|
28/09/2016
|
100
|
|
|
13/05/2019
|
|
52
|
IRIDP-2/BGT/DW-3
|
Improvement of Moidah Shibpur Club - Kaligati Road from Ch. 878m-1678m.
|
IRIDP-2
|
chitalmari
|
201144011
|
0.80
|
|
|
36.66
|
M/S. Sohel Construction
|
32.13
|
17/01/2016
|
|
27/08/2016
|
100
|
|
|
13/05/2019
|
|
53
|
IRIDP-2/BGT/DW-6
|
(a) Improvement of Basbaria-Umajuri Road from Ch. 1337m-1750m. (b) Construction of 1 No 0.625x0.600m Culvert at Ch. 1720m on the Same Road.
|
IRIDP-2
|
chitalmari
|
201144019
|
0.41
|
0.62
|
|
23.74
|
M/S Faisal Traders
|
19.94
|
31/01/2016
|
|
08/08/2016
|
100
|
|
|
13/05/2019
|
|
54
|
RIDP-2/BGT/DW-5
|
(a) Improvement of Kuraltala-Boalia Road-WDB Embk. Road from Ch. 00m-750m. (b) Construction of 2 Nos 0.625x0.600m Culvert at Ch. 119m & 197m on the Same Road (c) Construction of 1 vent 4.30x3.60m Culvert at Ch. 269m on the Same Road.
|
IRIDP-2
|
chitalmari
|
201144005
|
0.75
|
5.55
|
|
55.50
|
M/S. F.K Trade Link
|
47.69
|
24/01/2016
|
|
29/09/2016
|
100
|
|
|
13/05/2019
|
|
55
|
IRIDP-2/BGT/DW-48
|
(a) Improvement of Char Chinguri- Jalil Sheikh's House - Kalatala Road Ch. (700m-1494m) (b) Construction of 1 No 0.625x0.600m Culvert at Ch. 991m on the Same Road.
|
IRIDP-2
|
chitalmari
|
201144055
|
0.79
|
0.62
|
|
38.30
|
M/S. F.K Trade Link
|
32.55
|
|
08/08/2016
|
|
100
|
|
|
13/05/2019
|
|
56
|
IRIDP-2/BGT/DW-53
|
(a) Improvement of Besharkhola (Bottola) - Bottola Abdul Gazi house road via Sultan Chairman house road (Ch.00m - 750m). ID No. 201145114(b) Construction of 2No 0.625mx0.60m Culvert at Ch.420m& 740m on the Same Road.
|
IRIDP-2
|
chitalmari
|
201145114
|
0.75
|
1.25
|
|
43.50
|
M/S. F.K Trade Link
|
38.25
|
24/09/2016
|
|
22/08/2017
|
100
|
|
|
13/05/2019
|
|
57
|
IRIDP-2/BGT/MW-96
|
Maintenance of Khaserhat - Asoknagar road (Ch.1300m-2300m)
|
IRIDP-2
|
chitalmari
|
201144032
|
1.00
|
|
|
17.04
|
M/S. Reza Enterprise
|
14.73
|
06/03/2017
|
|
07/12/2017
|
100
|
|
|
13/05/2019
|
|
58
|
IRIDP-2/BGT/DW-5
|
(a) Improvement of Kuraltala-Boalia Road-WDB Embk. Road from Ch. 00m-750m. (b) Construction of 2 Nos 0.625x0.600m Culvert at Ch. 119m & 197m on the Same Road (c) Construction of 1 vent 4.30x3.60m Culvert at Ch. 269m on the Same Road.
|
IRIDP-2
|
chitalmari
|
201144005
|
0.75
|
|
|
55.50
|
M/S. F.K Trade Link
|
47.69
|
24/01/2016
|
|
|
100
|
|
|
20/03/2019
|
|
59
|
IRIDP-2/BGT/DW-106
|
(a)Improvement of Nawapara Pry. School-Syambagat road( Ch.00m-1200m).ID No. 201344060(b) Construction of 2No 0.60mx0.60m Culvert at Ch.360m&970 on the Same Road.(c) Construction of 1No 3.50mx3.0m Culvert at Ch.130m on the Same Road.
|
IRIDP-2
|
fakirhat
|
201344060
|
1.20
|
4.70
|
|
65.85
|
M/S. M.M Brothers
|
64.69
|
10/07/2017
|
|
18/05/2018
|
100
|
|
|
14/05/2019
|
|
60
|
IRIDP-2/BGT/DW-107
|
(a)Improvement of Betaga Village road( Ch.00m-500m).ID No. 201345048(b) Construction of 2No 0.60mx0.60m Culvert at Ch.270m&420 on the Same Road.
|
IRIDP-2
|
fakirhat
|
201345048
|
0.50
|
1.20
|
|
25.80
|
M/S. M.M Brothers
|
25.37
|
17/07/2017
|
|
31/05/2018
|
100
|
|
|
14/05/2019
|
|
61
|
IRIDP-2/BGT/DW-109
|
(a)Improvement of Shaitsika Village road( Ch.500m-1500m).ID No. 201345030(b) Construction of 3No 0.60mx0.60m Culvert at Ch.515m,815m&1120 on the Same Road.
|
IRIDP-2
|
fakirhat
|
201345030
|
1.00
|
1.80
|
|
47.38
|
M/S. M.M Brothers
|
46.61
|
17/07/2017
|
|
02/06/2018
|
100
|
|
|
14/05/2019
|
|
62
|
IRIDP-2/BGT/SDW-134
|
(a)Improvement of Dhaka Khulna RHD ( Balurmat)-Lokhpur GC Road (Ch.1500m-2500m).ID No. 201344099(b) Construction of 4No 0.60mx0.60m Culvert at Ch.1653m,1794m,1981m&2450m on the Same Road.
|
IRIDP-2
|
fakirhat
|
201344099
|
1.00
|
2.40
|
|
63.07
|
M/S. S.S Traders
|
59.90
|
12/12/2017
|
|
17/10/2018
|
100
|
|
|
14/05/2019
|
|
63
|
IRIDP-2/BGT/SDW-154
|
(a)Improvement of Dhaka Khulna RHD ( Balurmat)-Lokhpur GC Road (Ch.2500m-3700m).ID No. 201344099(b) Construction of 2No 0.60mx0.60m Culvert at Ch.2878m&3399m on the Same Road.
|
IRIDP-2
|
fakirhat
|
201344099
|
1.20
|
1.20
|
|
71.68
|
M/S. S.S Traders
|
65.58
|
06/02/2018
|
|
15/10/2018
|
100
|
|
|
14/05/2019
|
|
64
|
IRIDP-2/BGT/SDW-155
|
(a)Improvement of Bailtoly-Lalchandrapur Road (Ch.00m-794m).ID No. 201344037(b) Construction of 1No 0.60mx0.60m Culvert at Ch.599m on the Same Road.(c) Construction of 1No 2.0mx2.0m Culvert at Ch.375m on the Same Road.
|
IRIDP-2
|
fakirhat
|
201344037
|
0.79
|
2.60
|
|
50.88
|
M/S. Mijan Enterprise
|
46.27
|
30/01/2018
|
|
25/10/2018
|
100
|
|
|
14/05/2019
|
|
65
|
IRIDP-2/BGT/SDW-156
|
(a) Improvement of Bailtoly-Lalchandrapur road (Ch.794m-1520m)(b) Construction of 4Nos 0.60mx0.60m Culvert at Ch.874m. 1040m, 1189m, & 13463 on the same road.
|
IRIDP-2
|
fakirhat
|
201344037
|
0.73
|
2.40
|
|
44.14
|
M/S. S.S Traders
|
39.86
|
19/08/2018
|
|
15/10/2018
|
100
|
|
|
14/05/2019
|
|
66
|
IRIDP-2/BGT/SDW-158
|
(a)Improvement of Baliadanga Natun mat - Police fari Road (Ch.00m-1116m).ID No. 201344101(b) Construction of 4No 0.60mx0.60m Culvert at Ch.78m,533m,717m&1065m on the Same Road.
|
IRIDP-2
|
fakirhat
|
201344101
|
1.12
|
2.40
|
|
67.54
|
M/S Betaga traders
|
67.58
|
05/04/2018
|
|
11/12/2018
|
100
|
|
|
14/05/2019
|
|
67
|
IRIDP-2/BGT/DW-165
|
(a)Improvement of Khulna- Dhaka RHD(Ziel Tola)-Morolpara- Boiltali Sluice Gate road (Ch.00m- 1620m).ID No. 201344128(b) Construction of 05No 0.60mx0.60m Culvert at Ch.220m, 514m,756m,790m,1220m on the Same Road. 0 0 13,726,908.00 0.00 0
|
IRIDP-2
|
fakirhat
|
201344128
|
1.62
|
3.00
|
|
137.26
|
|
0.00
|
|
|
|
0
|
|
|
14/05/2019
|
|
68
|
IRIDP-2/BGT/DW-166
|
(a)Improvement of Piljong UP-Dhaka-khulna RHD ( Kolomer Dokan) road (Ch.00m- 2800m).ID No. 201344120(b) Construction of 08No 0.60mx0.60m Culvert at Ch.509m, 760m,910m,970m,1059m,1217m,1535m,2770m on the Same Road. 0 0 19,943,877.00 0.00 0
|
IRIDP-2
|
fakirhat
|
201344120
|
2.80
|
4.80
|
|
199.43
|
|
0.00
|
|
|
|
0
|
|
|
14/05/2019
|
|
69
|
IRIDP-2/BGT/DW-9
|
(a) Improvement of Naugiabari more RHD-Hosla-Bahirdia UP Road from Ch. 1000m-2100m. (b) Construction of 2Nos 0.600x0.600m Culvert at Ch. 1040m & 1590m on the Same Road.
|
IRIDP-2
|
fakirhat
|
201343010
|
1.10
|
1.20
|
|
61.23
|
M/S. Mizan Enterprise
|
51.39
|
31/01/2016
|
|
06/12/2016
|
100
|
|
|
13/05/2019
|
|
70
|
IRIDP-2/BGT/DW-11
|
Improvement of Khulna Mollaharhat house building Road from Ch. 640m-823m.
|
IRIDP-2
|
fakirhat
|
201345013
|
0.18
|
|
|
10.43
|
M/S. Mizan Enterprise
|
9.07
|
31/01/2016
|
|
03/08/2016
|
100
|
|
|
13/05/2019
|
|
71
|
IRIDP-2/BGT/MW-33
|
Maintenance of Shibbari - Dhar Moubhog road (ch.00m-1620m).
|
IRIDP-2
|
fakirhat
|
201344013
|
1.62
|
|
|
37.51
|
M/S. Shovo Enterprise
|
29.58
|
24/02/2016
|
|
09/01/2016
|
100
|
|
|
13/05/2019
|
|
72
|
IRIDP-2/BGT/MW-34
|
Maintenance of Betaga life sub-centre - H/O Laxmikamti dash road (ch.00m - 2200m)
|
IRIDP-2
|
fakirhat
|
201344030
|
2.20
|
|
|
37.39
|
M/S. Shovo Enterprise
|
29.51
|
31/07/2016
|
|
31/07/2016
|
100
|
|
|
13/05/2019
|
|
73
|
IRIDP-2/BGT/MW-35
|
Maintenance of Moubhog - Dohormoubhog road (ch.00m - 2855m)
|
IRIDP-2
|
fakirhat
|
201344035
|
2.86
|
|
|
50.69
|
M/S. Shovo Enterprise
|
39.94
|
24/02/2016
|
|
20/01/2016
|
100
|
|
|
13/05/2019
|
|
74
|
IRIDP-2/BGT/MW-36
|
(a) Maintenance of Kuroltala kheyaghat - kalitala road (ch.00m-655m & 1920m- 3550m) (b) Construction of 01No 0.60mx0.60m Culvert at ch.449m on the Same Road.
|
IRIDP-2
|
fakirhat
|
201344016
|
2.29
|
0.60
|
|
27.57
|
M/S. Shovo Enterprise
|
21.72
|
24/02/2016
|
|
11/04/2016
|
100
|
|
|
13/05/2019
|
|
75
|
IRIDP-2/BGT/DW-51
|
(a) Improvement of Betaga - Datneymari via Nicklaypur road (Ch: 00-1203m). (b) Construction of 3Nos 0.600x0.600m Culvert at Ch.228m,828m & 993m on the Same Road.
|
IRIDP-2
|
fakirhat
|
201345085
|
1.20
|
1.80
|
|
57.49
|
Md. Shariful Alam
|
53.72
|
30/06/2016
|
|
20/09/2017
|
100
|
|
|
13/05/2019
|
|
76
|
IRIDP-2/BGT/DW-57
|
Improvement of Sattala-Bigai Shool via Nona Pukur road (Ch:1000-2000m). ID No. 201345083
|
IRIDP-2
|
fakirhat
|
201345083
|
1.00
|
|
|
50.78
|
M/S. Mijan Enterprise
|
49.76
|
09/01/2017
|
|
15/10/2017
|
100
|
|
|
13/05/2019
|
|
77
|
IRIDP-2/BGT/DW-58
|
Improvement of Faltita-Kathal bari Rd (Starting from Baniakhali toot Bridge) (Ch: 00-1000m).. ID No. 201344057
|
IRIDP-2
|
fakirhat
|
201344057
|
1.00
|
|
|
80.46
|
M/S. Mizan Enterprise
|
76.03
|
21/11/2016
|
|
27/08/2017
|
100
|
|
|
13/05/2019
|
|
78
|
IRIDP-2/BGT/DW-59
|
(a) Improvement of Khthaltala High school to Mokbul sk, house road (Ch.375m - 948m). ID No. 20114095(b) Construction of 3No 0.625mx0.60m Culvert at Ch.405m,510m& 870m on the Same Road.
|
IRIDP-2
|
fakirhat
|
201344095
|
0.57
|
1.87
|
|
27.66
|
M/S. Mijan Enterprise
|
27.66
|
09/01/2017
|
|
09/04/2018
|
100
|
|
|
13/05/2019
|
|
79
|
IRIDP-2/BGT/DW-72
|
Construction of 1No 4.50mx3.0m Culvert at Ch.1950 on the Gazalia-Bishar khola Road.
|
IRIDP-2
|
kachua
|
201384042
|
|
4.50
|
|
11.55
|
M/S. Bhuiyan Construction
|
11.53
|
23/10/2016
|
|
26/02/2017
|
100
|
|
|
20/05/2019
|
|
80
|
IRIDP-2/BGT/DW-73
|
Construction of 1No 4.50mx3.50m Culvert at Ch.950 on the B.Andermanik-S.Club-Kuchibaga-Andermanik H. school Road.
|
IRIDP-2
|
kachua
|
201385014
|
|
4.50
|
|
12.06
|
M/S. Bhuiyan Construction
|
12.05
|
23/10/2016
|
|
12/02/2017
|
100
|
|
|
20/05/2019
|
|
81
|
IRIDP-2/BGT/DW-74
|
Construction of 1No 5.0mx3.50m Culvert at Ch.1000 on the Uttar-GopalpurFWC-Kachua Iron Bridge Road.
|
IRIDP-2
|
kachua
|
201384043
|
|
5.00
|
|
12.43
|
M/S. Bhuiyan Construction
|
12.41
|
23/10/2016
|
|
02/01/2017
|
100
|
|
|
20/05/2019
|
|
82
|
IRIDP-2/BGT/DW-75
|
Construction of 1No 4.50mx3.50m Culvert at Ch.00 on the Sonakur-Charsonakur(Bot-tala)Primary School Road.
|
IRIDP-2
|
kachua
|
201385015
|
|
4.50
|
|
12.06
|
M/S. Faruqe Enterprise
|
12.04
|
24/10/2016
|
|
08/01/2017
|
100
|
|
|
20/05/2019
|
|
83
|
IRIDP-2/BGT/DW-76
|
Construction of 1No 4.50mx3.00m Culvert at Ch.00 on the Kombolpur Road
|
IRIDP-2
|
kachua
|
201385021
|
|
4.50
|
|
11.55
|
M/S. Tasfia Construction
|
12.03
|
24/10/2016
|
|
25/08/2017
|
100
|
|
|
20/05/2019
|
|
84
|
IRIDP-2/BGT/DW-84
|
(a) Improvement of Natun hat – bagmara Road ( Ch.00m-1008m).ID No. 201384012(b) Construction of 2No 2.00mx2.00m Culvert at Ch. 10m & 918 on the Same Road.(c) Construction of 1No 0.625mx0.60m Culvert at Ch.275m on the Same Road.
|
IRIDP-2
|
kachua
|
201384012
|
1.01
|
4.62
|
|
87.74
|
M/S. Alif Store
|
75.20
|
04/01/2017
|
|
05/06/2017
|
100
|
|
|
20/05/2019
|
|
85
|
IRIDP-2/BGT/SDW-91
|
a) Improvement of Padmanagor Bridge - Ejara Padmanagor road (Ch.00m-1807m)b) Construction of 1no 2x4.0mx4.0m Culvert at Ch. 914m on the same on the same road.c) Construction of 1no 4.50mx3.0m Culvert at Ch. 536m on the same on the same road. d) Construction of 2no 0.625mx0.60m Culvert at Ch. 1068m, 1200m on the same on the same road. e) Construction of 1no 2.0mx2.0m Culvert at Ch. 1528m on the same road.
|
IRIDP-2
|
kachua
|
201384065
|
1.81
|
15.75
|
|
115.93
|
Sardar Jashim
|
102.88
|
26/02/2017
|
|
28/01/2018
|
100
|
|
|
20/05/2019
|
|
86
|
IRIDP-2/BGT/MW-95
|
Maintenance of Vasha-Citabari Road (Ch. 00m-1030m)
|
IRIDP-2
|
kachua
|
201384010
|
1.03
|
|
|
17.76
|
M/S Shovo Enterprise
|
15.95
|
06/03/2017
|
|
20/04/2017
|
100
|
|
|
20/05/2019
|
|
87
|
IRIDP-2/BGT/MW-115
|
Maintenance of Hazrakhali Bazar – Joygaashi Taleshwar road ( Ch.00m-1300m).ID No. 201384120
|
IRIDP-2
|
kachua
|
201384120
|
1.30
|
|
|
20.94
|
M/S. Shawon Enterprise
|
21.97
|
05/07/2017
|
|
30/10/2017
|
100
|
|
|
20/05/2019
|
|
88
|
IRIDP-2/BGT/MW-116
|
Maintenance of Vasha bazar-Boga bazar road ( Ch.00m-245m).ID No. 201384055
|
IRIDP-2
|
kachua
|
201384055
|
0.25
|
|
|
6.78
|
M/S. Shawon Enterprise
|
7.12
|
05/07/2017
|
|
29/10/2017
|
100
|
|
|
20/05/2019
|
|
89
|
IRIDP-2/BGT/MW-117
|
Maintenance of Goalmath - Raripara Palpara road ( Ch.00m-1000m).ID No. 201384004
|
IRIDP-2
|
kachua
|
201384004
|
1.00
|
|
|
19.63
|
M/S. Shawon Enterprise
|
20.59
|
05/07/2017
|
|
14/11/2017
|
100
|
|
|
20/05/2019
|
|
90
|
IRIDP-2/BGT/MW-118
|
Maintenance of Mosni Bazar-Bishkhali-Ragudattokati road ( Ch.00m-668m).ID No. 201384073
|
IRIDP-2
|
kachua
|
201384073
|
0.67
|
|
|
10.64
|
M/S. Shawon Enterprise
|
11.16
|
05/07/2017
|
|
17/10/2017
|
100
|
|
|
20/05/2019
|
|
91
|
IRIDP-2/BGT/MW-119
|
Maintenance of Mosni Bazar – Bodhobhumi (Rogudottokati Kali Bari-Nimay Asram )road ( Ch.00m-1500m).ID No. 201384085
|
IRIDP-2
|
kachua
|
201384085
|
1.50
|
|
|
25.05
|
M/S. Shawon Enterprise
|
26.27
|
22/06/2017
|
|
15/10/2017
|
100
|
|
|
20/05/2019
|
|
92
|
IRIDP-2/BGT/DW-125
|
Improvement of Mogia UP Office-Kathalia Ghat road( Ch.00m-1300m).ID No. 201384058
|
IRIDP-2
|
kachua
|
201384058
|
1.30
|
|
|
67.18
|
M/S. Alif Store
|
70.50
|
05/07/2017
|
|
25/10/2017
|
100
|
|
|
20/05/2019
|
|
93
|
IRIDP-2/BGT/DW-126
|
Construction of 1No 4.50mx3.0m Culvert at Ch.1450m on Khalishakhali-Venderkhola-Narandoropur road.ID No. 201384075
|
IRIDP-2
|
kachua
|
201384075
|
|
4.50
|
|
10.91
|
M/S. Munna Enterprise
|
10.39
|
04/07/2017
|
|
20/02/2018
|
100
|
|
|
20/05/2019
|
|
94
|
IRIDP-2/BGT/DW-127
|
Construction of 1No 5.0mx3.50m Culvert at Ch.500m on Chairkati-Baraikhali school road ID No. 201384077
|
IRIDP-2
|
kachua
|
201384077
|
|
5.00
|
|
11.93
|
M/S. Munna Enterprise
|
10.88
|
04/07/2017
|
|
11/02/2018
|
100
|
|
|
20/05/2019
|
|
95
|
IRIDP-2/BGT/DW-128
|
a) Improvement of Madertola - Larakul road (Ch.00m-891m & link road 70.00m).b) Construction of 1No 4.50mx3.0m Culvert at Ch. 630 on the Same Road.c) Construction of 1No 0.625mx0.60m Culvert at Ch. 293m on the Same Road. d) Construction of 1No 2.0mx2.0m Culvert at Ch. 403m the Same Road.
|
IRIDP-2
|
kachua
|
201384067
|
0.96
|
7.12
|
|
61.49
|
M/S. Masud Enterprise
|
64.55
|
12/07/2017
|
|
20/11/2017
|
100
|
|
|
20/05/2019
|
|
96
|
IRIDP-2/BGT/SDW-130
|
a) Improvement of Kachua Upazila Central Eidgah-Shahid Zia RNGPS Via Near The H/O Shahid Bhai Road (Ch.00-236m)b) Construction of 1No 5.0mx3.50m Culvert at Ch.365m on the same road
|
IRIDP-2
|
kachua
|
201385054
|
0.24
|
5.00
|
|
38.15
|
M/S. Ahamed Steel Industries
|
36.77
|
26/07/2017
|
|
03/01/2019
|
100
|
|
|
20/05/2019
|
|
97
|
IRIDP-2/BGT/DW-132
|
Construction of 1No 1.0mx2.00m Culvert at Ch.700m on the Kachua-Gazalia road. ID No. 2012382001
|
IRIDP-2
|
kachua
|
201382001
|
|
1.00
|
|
7.13
|
M/S. Tasfia Construction
|
6.43
|
31/10/2017
|
|
26/11/2017
|
100
|
|
|
20/05/2019
|
|
98
|
IRIDP-2/BGT/DW-20
|
(a) Improvement of Laraahat-Lararkul Road from Ch. 00m-286m. (b) Construction of 4.50x3.50m Culvert at Ch. 900m on the Same Road. (c) Construction of 0.625x0.600m Culvert at Ch. 150m on the Same Road.
|
IRIDP-2
|
kachua
|
201384045
|
0.29
|
5.12
|
|
27.46
|
M/S Masud Enterprise
|
23.57
|
18/01/2016
|
|
08/08/2016
|
100
|
|
|
19/05/2019
|
|
99
|
IRIDP-2/BGT/DW-21
|
Construction of 4.50x3.50m Culvert on Kachua UP-Taleshwer bazar Road at Ch. 5m.
|
IRIDP-2
|
kachua
|
201384054
|
|
4.50
|
|
12.13
|
M/S. Sohel Construction
|
9.68
|
24/01/2016
|
|
08/08/2016
|
100
|
|
|
19/05/2019
|
|
100
|
IRIDP-2/BGT/MW-42
|
(a)Maintenance of Kachua-Badhal FRB to Tagrakhal river Ghat(Football field) road (ch.1090m - 2430m) (b) Construction of 01 no 2.0m x 2.0m Culvert at Ch:2260m on the same road (c) Construction of 01 no 0.625m x 0.60m Culvert at Ch:2090m on the same road
|
IRIDP-2
|
kachua
|
201384014
|
1.34
|
2.62
|
|
38.83
|
M/S Shawon Enterprise
|
37.26
|
26/05/2016
|
|
15/11/2016
|
100
|
|
|
19/05/2019
|
|
101
|
IRIDP-2/BGT/DW-45
|
Improvement of Fatehpur bazar-Gopalpur UP-Fultala bazar road (ch.5210m-6153m).
|
IRIDP-2
|
kachua
|
201383005
|
0.94
|
|
|
41.28
|
M/S Shawon Enterprise
|
41.12
|
26/05/2016
|
|
01/12/2016
|
100
|
|
|
19/05/2019
|
|
102
|
IRIDP-2/BGT/DW-46
|
(a)Improvement of Bakultala-Moshni road (ch.800m-1529m). (b) Construction of 01 no 4.50m x 3.50m Culvert at Ch:959m on the same road (c) Construction of 01 no 0.625m x 0.60m Culvert at Ch:1272m on the same road
|
IRIDP-2
|
kachua
|
201384017
|
0.73
|
5.12
|
|
45.13
|
M/S Shawon Enterprise
|
44.83
|
26/05/2016
|
|
28/11/2016
|
100
|
|
|
19/05/2019
|
|
103
|
IRIDP-2/BGT/DW-47
|
(a)Improvement of Kachua UP-Talwshwer bazar road (ch.2461m-3190m). (b) Construction of 01 no 4.50m x 3.50m Culvert at Ch:3474m on the same road (c) Construction of 01 no 0.625m x 0.60m Culvert at Ch:2631m on the same road
|
IRIDP-2
|
kachua
|
201383009
|
0.73
|
5.12
|
|
45.12
|
M/S Shawon Enterprise
|
41.67
|
26/05/2016
|
|
08/08/2016
|
100
|
|
|
19/05/2019
|
|
104
|
IRIDP-2/BGT/SDW-52
|
Improvement of Shibpur - Chadropara Road Ch. (00m-350m)
|
IRIDP-2
|
kachua
|
201384078
|
0.35
|
|
|
30.96
|
M/S Masud Enterprise
|
30.96
|
30/06/2016
|
|
27/02/2017
|
100
|
|
|
19/05/2019
|
|
105
|
IRIDP-2/BGT/DW-70
|
(a)Improvement of Madertala-Jobai road (Ch.432m - 972m). ID No. 201384019(b) Construction of 1No 2.0mx2.0m Culvert at Ch.931 on the Same Road.(c) Construction of 1No 0.625mx0.60m Culvert at Ch.832 on the Same Road.
|
IRIDP-2
|
kachua
|
201384019
|
0.54
|
2.62
|
|
43.12
|
M/S. Alif Store
|
43.11
|
24/10/2016
|
|
19/06/2017
|
100
|
|
|
19/05/2019
|
|
106
|
IRIDP-2/BGT/DW-71
|
Improvement of Laraahat-Lararkul road (Ch:290-686m). ID No. 201384045
|
IRIDP-2
|
kachua
|
201384045
|
0.40
|
|
|
30.76
|
M/S. Alif Store
|
30.77
|
24/10/2016
|
|
15/06/2017
|
100
|
|
|
19/05/2019
|
|
107
|
IRIDP-2/BGT/DW-16
|
(a) Improvement of Maliporton school-Bishkhali Road from Ch. 00m-408m. (b) Construction of 2.00x2.00m Culvert at Ch. 800m on the Same Road.
|
IRIDP-2
|
kachua
|
201384044
|
0.41
|
2.00
|
|
23.54
|
M/S Masud Enterprise
|
23.17
|
18/01/2016
|
|
07/06/2016
|
100
|
|
|
14/05/2019
|
|
108
|
IRIDP-2/BGT/DW-17
|
(a)Improvement of B.Andermanik-S.Club-Kuchibaga-Andermanik H. school Road from Ch. 00m-274m. (b) Construction of 4.50x3.50m Culvert at Ch. 950m on the Same Road. (c) Construction of 2.00x2.00m Culvert at Ch. 143m on the Same Road. (d) Construction of 0.625x0.600m Culvert at Ch. 744m on the Same Road.
|
IRIDP-2
|
kachua
|
201385014
|
0.27
|
7.12
|
|
30.43
|
M/S Masud Enterprise
|
26.17
|
18/01/2016
|
|
08/06/2016
|
100
|
|
|
14/05/2019
|
|
109
|
IRIDP-2/BGT/DW-18
|
(a) Improvement of Guzarpara-Baleshsor River Ghat Road from Ch. 00m-558m. (b) Construction of 4.50x3.50mCulvert at Ch. 1000m on the Same Road. (c) Construction of 2Nos 0.625x0.600m Culvert at Ch. 226m & 322m on the Same Road.
|
IRIDP-2
|
kachua
|
201384103
|
0.56
|
5.75
|
|
42.71
|
Sardar Jashim
|
39.00
|
24/01/2016
|
|
07/12/2016
|
100
|
|
|
14/05/2019
|
|
110
|
IRIDP-2/BGT/DW-19
|
(a) Improvement of Hazrapara-Tulatola Road from Ch. 1100m-1714m. (b) Construction of 4.50x3.50m Culvert at Ch. 1532m on the Same Road. (c) Construction of 0.625x0.600m Culvert at Ch. 1220m on the Same Road.
|
IRIDP-2
|
kachua
|
201385006
|
0.61
|
5.12
|
|
42.44
|
M/S Masud Enterprise
|
39.18
|
18/01/2016
|
|
04/10/2016
|
100
|
|
|
14/05/2019
|
|
111
|
IRIDP-2/BGT/DW-102
|
Improvement of Garfa-Girishnagar-Kadamtala Khayaghat road( Ch.00m-1610m).ID No. 201564047
|
IRIDP-2
|
mollahat
|
201564047
|
1.61
|
|
|
46.22
|
M/S. Khan Enterprise
|
42.02
|
06/06/2017
|
|
04/01/2018
|
100
|
|
|
14/05/2019
|
|
112
|
RIDP-2/BGT/DW-104
|
(a)Improvement of Atjuri UP-Kadamtala Kheyaghat road( Ch.1287m-2800m).ID No. 201564016(b) Construction of 3No 0.60mx1.125m Culvert at Ch.1352m,1810m& 2465 on the Same Road.(c) Construction of 2No 0.625mx0.60m Culvert at Ch.2535m& 2773m on the Same Road.
|
IRIDP-2
|
mollahat
|
201564016
|
1.51
|
3.05
|
|
86.41
|
M/S. Kamrul & Brothers
|
77.77
|
28/06/2017
|
|
20/12/2018
|
100
|
|
|
14/05/2019
|
|
113
|
IRIDP-2/BGT/DW-105
|
(a)Improvement of H/o Tofazzel Molla to H/o Monirul Molla at aruakandiroad( Ch.00m-860m).ID No. 201565077(b) Construction of 1No 0.60mx1.125m Culvert at Ch.395 on the Same Road.c) Construction of 2No 0.625mx0.60m Culvert at Ch.549m & 590m on the same road
|
IRIDP-2
|
mollahat
|
201565077
|
0.86
|
1.85
|
|
41.75
|
MS Deep Bricks
|
41.57
|
15/06/2017
|
|
12/12/2017
|
100
|
|
|
14/05/2019
|
|
114
|
IRIDP-2/BGT/DW-108
|
(a)Improvement of Ghanashampur-Bashbaria village road( Ch.00m-1000m).ID No. 201344092(b) Construction of 2No 0.60mx0.60m Culvert at Ch.62m&120 on the Same Road.
|
IRIDP-2
|
mollahat
|
201344092
|
1.00
|
1.20
|
|
49.40
|
M/S. M.M Brothers
|
48.63
|
17/07/2017
|
|
21/06/2018
|
100
|
|
|
14/05/2019
|
|
115
|
IRIDP-2/BGT/SDW-129
|
Improvement of Approch road to Laila Azad College from Old Khulna – Dhaka road (Ch.00m-270m).ID No. 201565106 &link T&T Office from Bridge poinr – College Campaus240m& Along bank of Nalua Khal 190.0m
|
IRIDP-2
|
mollahat
|
201565106
|
0.51
|
|
|
41.96
|
M/S. Khan Enterprise
|
38.44
|
20/07/2017
|
|
07/03/2018
|
100
|
|
|
14/05/2019
|
|
116
|
IRIDP-2/BGT/SDW-153
|
Construction of 01No 2x4.5mx3.0m Culvert at Ch.4090m on Kodalia U.P Office - Aruadehi hat Road.ID No. 201563004
|
IRIDP-2
|
mollahat
|
201563004
|
9.00
|
|
|
17.32
|
M/S. Bhai Bhai Enterprise
|
15.58
|
04/01/2018
|
|
05/03/2018
|
100
|
|
|
14/05/2019
|
|
117
|
IRIDP-2/BGT/DW-55
|
Improvement of Burigangni Kalam Kazi- house- Abdul Fakir house road (Ch.00m - 1000m). ID No. 201565093
|
IRIDP-2
|
mollahat
|
201565093
|
1.00
|
|
|
45.77
|
S.M Nurul Islam
|
38.45
|
10/10/2016
|
|
31/07/2018
|
60
|
|
|
14/05/2019
|
|
118
|
IRIDP-2/BGT/DW-56
|
Improvement of Rahmotpara-Panipara road (Ch.00m - 1000m). ID No. 201564056
|
IRIDP-2
|
mollahat
|
201564056
|
1.00
|
|
|
45.77
|
S.M Nurul Islam
|
38.06
|
10/10/2016
|
|
31/07/2018
|
60
|
|
|
14/05/2019
|
|
119
|
IRIDP-2/BGT/DW-101
|
(a)Improvement of Gatbila Bridge-Rajpat Bil road( Ch.00m-1250m).ID No. 201564030(b) Construction of 1No 0.625mx0.60m Culvert at Ch.100m on the Same Road.
|
IRIDP-2
|
mollahat
|
201564030
|
1.25
|
0.62
|
|
57.43
|
M/S. Monir Traders
|
51.77
|
15/06/2017
|
|
02/06/2018
|
30
|
|
|
14/05/2019
|
|
120
|
RIDP-2/BGT/DW-103
|
(a)Improvement of Rajpat Chairmanbari – Bishowroad road( Ch.00m-560m).ID No. 201565104(b) Construction of 1No 0.625mx0.60m Culvert at Ch.540m on the Same Road.
|
IRIDP-2
|
mollahat
|
201565104
|
0.56
|
0.62
|
|
28.46
|
M/S. Monir Traders
|
25.61
|
15/06/2017
|
|
02/06/2018
|
60
|
|
|
14/05/2019
|
|
121
|
IRIDP-2/BGT/DW-7
|
(a)Improvement of Shason Sobed Molla house – Jamai more Road from Ch. 00m-1000m. (b) Construction of 2 Nos 0.60x0.75m Culvert at Ch.300m&900m on the Same Road.
|
IRIDP-2
|
mollahat
|
201565079
|
1.00
|
1.20
|
|
50.00
|
Shikder Zahidul Islam
|
42.28
|
31/01/2016
|
|
15/01/2017
|
100
|
|
|
13/05/2019
|
|
122
|
IRIDP-2/BGT/DW-8
|
(a) Improvement of Mollahat Nalua UZR-Aruadehi parchim para govt.pry.school Road by BC from Ch. 00m-1106m. (b) Construction of 0.600x0.750m Culvert at Ch. 350m on the Same Road.
|
IRIDP-2
|
mollahat
|
201565049
|
1.11
|
0.60
|
|
50.00
|
M/S. Mizan Enterprise
|
42.50
|
31/01/2016
|
|
05/11/2016
|
100
|
|
|
13/05/2019
|
|
123
|
IRIDP-2/BGT/DW-10
|
(a) Improvement of Sambagat R&H-Jaria Mitkumra Shardar house mosque Road by BC from Ch. 00m-1000m. (b) Construction of 3Nos 0.600x0.600m Culvert at Ch. 200m, 300m & 350m on the Same Road.
|
IRIDP-2
|
mollahat
|
201344067
|
1.00
|
1.80
|
|
47.17
|
M/S. Mizan Enterprise
|
39.62
|
31/01/2016
|
|
02/02/2017
|
100
|
|
|
13/05/2019
|
|
124
|
IRIDP-2/BGT/DW-49
|
Improvement of Sarospur Road (Ch. 1200m-2060.5m)
|
IRIDP-2
|
mollahat
|
201565008
|
0.86
|
|
|
47.76
|
M/S. S.S. Brothers
|
50.13
|
21/06/2016
|
|
27/03/2017
|
100
|
|
|
13/05/2019
|
|
125
|
IRIDP-2/BGT/DW-50
|
(a)Improvement of Dabra-Madartala - Dabra govt.pry.school road (Ch. 00m-1020.50m) (b) Construction of 1 No 0.60x0.75m Culvert at Ch.300m on the Same Road.
|
IRIDP-2
|
mollahat
|
201565065
|
1.02
|
0.60
|
|
48.12
|
M/S Iqbal & Brothers
|
39.88
|
21/06/2016
|
|
19/05/2017
|
100
|
|
|
13/05/2019
|
|
126
|
IRIDP-2/BGT/DW-54
|
Improvement of Kachna wapda-Sukur daria house road (Ch.00m - 1000m). ID No. 201564099
|
IRIDP-2
|
mollahat
|
201564099
|
1.00
|
|
|
45.77
|
M/S. Molla Enterprise
|
38.01
|
29/09/2016
|
|
28/08/2017
|
100
|
|
|
13/05/2019
|
|
127
|
IRIDP-2/BGT/DW-25
|
(a) Improvement of Holdibunia (Baliar more) - Burburia via Malgazi-Hid office Road from Ch. 755m-1365m. (b) Construction of 3 Nos 1.00x1.00m Culvert at Ch. 965m, 1083m & 1337m on the Same Road.
|
IRIDP-2
|
mongla
|
201584044
|
0.61
|
3.00
|
|
32.10
|
M/S A.R. Enterprise
|
28.74
|
26/01/2016
|
|
13/10/2016
|
100
|
|
|
21/05/2019
|
|
128
|
IRIDP-2/BGT/DW-37
|
(a) Improvement of Digiraj – Jhalmalia dhigi via Burirdanga union parishad road (Ch.2500m - 4040m). (b) Construction of 1No 1.0mx1.0m Culvert at Ch.3390m on the Same Road.
|
IRIDP-2
|
mongla
|
201582007
|
1.54
|
1.00
|
|
117.62
|
M/S. Shovo Enterprise
|
100.60
|
25/02/2016
|
|
30/12/2017
|
100
|
|
|
21/05/2019
|
|
129
|
IRIDP-2/BGT/DW-63
|
(a) Improvement of Shabermet (Vogomaner more) – Lakhmikhali (shadhur bare) road (Ch:00-1700m). ID No. 201584039(b) Construction of 3No 1.0mx1.0m Culvert at Ch.10m,549m,718m & 01 no 2.0mx 2.0 m Culvert at Ch.1620m on the Same Road.
|
IRIDP-2
|
mongla
|
201584039
|
1.70
|
5.00
|
|
117.01
|
M/S. Mohiuddin Ahmed
|
122.80
|
22/11/2016
|
|
31/12/2017
|
100
|
|
|
21/05/2019
|
|
130
|
IRIDP-2/BGT/DW-89
|
(a) Improvement of Mongla - Chatterhat GC at Tatibunia --Burburia School..Road ( Ch.00m-3200m).ID No. 201584017(b) Construction of 4No 1.0mx1.0m Culvert at Ch. 2395m,2550m,2600m&2825m on the Same Road.
|
IRIDP-2
|
mongla
|
201584017
|
3.20
|
4.00
|
|
131.36
|
M/S. Bhai Bhai Enterprise
|
137.92
|
15/01/2017
|
|
20/03/2018
|
100
|
|
|
21/05/2019
|
|
131
|
IRIDP-2/BGT/DW-90
|
(a) Improvement of Digraj bazar - Madurpalta Govt. Pond Road. ( Ch.00m-1307m).ID No. 201584094(b) Construction of 2No 1.0mx1.0m Culvert at Ch. 105m&135m on the Same Road.
|
IRIDP-2
|
mongla
|
201584094
|
1.31
|
2.00
|
|
57.39
|
|
57.39
|
15/01/2017
|
|
26/06/2017
|
100
|
|
|
21/05/2019
|
|
132
|
IRIDP-2/BGT/DW-150
|
Improvement of Chandpai UP-Chila hat road (Ch.00m-250m).ID No. 201583001 0
|
IRIDP-2
|
mongla
|
201583001
|
0.25
|
|
|
2091.00
|
M/S. Bhai Bhai Enterprise
|
21.28
|
04/01/2018
|
|
06/10/2018
|
100
|
|
|
21/05/2019
|
|
133
|
IRIDP-2/BGT/DW-149
|
(a)Improvement of Haldibunia-Dasherkhando road (Ch.00m-1750m).ID No. 201584050(b) Construction of 05No 1.0mx1.0m Culvert at Ch.142m,175m,1100m,1326m &1415m on the Same Road.
|
IRIDP-2
|
mongla
|
201584050
|
1.75
|
5.00
|
|
99.00
|
M/S. Iqbal Enterprise
|
103.27
|
18/03/2018
|
|
18/10/2018
|
100
|
|
|
21/05/2019
|
|
134
|
IRIDP-2/BGT/DW-24
|
(a) Improvement of Sundarban UP - Madurpalta Bazar Road from Ch. 1900m-3000m. (b) Construction of 4 Nos 1.00x1.00m Culvert at Ch. 1600m, 1915m, 2105m & 2 240m on the Same Road.
|
IRIDP-2
|
mongla
|
201583005
|
1.10
|
4.00
|
|
49.09
|
M/S. Sohel Construction
|
44.68
|
17/01/2016
|
|
08/08/2016
|
100
|
|
|
20/05/2019
|
|
135
|
IRIDP-2/BGT/DW-28
|
(a) Improvement of Pollerhat GC - Chingrakhali UP-Zianagar RHD (Morel Part) (UP to UP Office) Road from Ch. 3629m-4110m & 5143m-5662m. (b) Construction of Single vent 4.0x4.0m Culvert at Ch. 1750m on the Same Road. (c) Construction of 4Nos 0.625x0.600m Culvert at Ch. 950m, 2370m, 2700m & 3250m on the Same Road.
|
IRIDP-2
|
morrelganj
|
201602006
|
1.00
|
6.50
|
|
5091.00
|
M/S. Moon Enterprise
|
44.42
|
26/01/2016
|
|
30/08/2017
|
100
|
|
|
22/05/2019
|
|
136
|
IRIDP-2/BGT/DW-29
|
Improvement of Chingrakhali GC - Daibajnahati GC Road from Ch. 2794m-6734m & 9200m-9420m.
|
IRIDP-2
|
morrelganj
|
201602002
|
4.16
|
|
|
226.62
|
M/S Jharna Enterprise
|
206.11
|
26/01/2016
|
|
09/04/2018
|
100
|
|
|
22/05/2019
|
|
137
|
IRIDP-2/BGT/DW-30
|
Improvement of Amtoli Madrasa - Wapda Embankment via South Kumarkhali RNGPS Road from Ch. 850m-3000m.
|
IRIDP-2
|
morrelganj
|
201605118
|
2.15
|
|
|
48.79
|
M/S. Chan Enterprise
|
45.13
|
06/03/2016
|
|
08/08/2016
|
100
|
|
|
22/05/2019
|
|
138
|
IRIDP-2/BGT/DW-38
|
Improvement of Herma Mondal bari Aurjon bahor Shimna road (Ch.00m - 2500m). IDNo.201605160
|
IRIDP-2
|
morrelganj
|
201605160
|
2.50
|
|
|
85.97
|
M/S. S.S. Brothers
|
90.27
|
12/05/2016
|
|
24/08/2016
|
100
|
|
|
22/05/2019
|
|
139
|
IRIDP-2/BGT/SDW-39
|
Improvement of Shrenikhali (Munshir hat) – Sonakhali bazar road (Ch.2200m - 2900m). IDNo.201604161
|
IRIDP-2
|
morrelganj
|
201604161
|
0.70
|
|
|
18.89
|
M/S Monir Bricks Enterprise
|
16.24
|
05/05/2016
|
|
10/11/2016
|
100
|
|
|
22/05/2019
|
|
140
|
IRIDP-2/BGT/DW-65
|
(a) Improvement of East Chandripur Badsha Mia Shop-Dakuar Khal bridge via Ramchandrapur Bazar Road (ch.1500m-2863m)ID No. 201605050(b) Construction of 2No 0.625mx0.60m Culvert at Ch.1635m & 2026m on the Same Road.
|
IRIDP-2
|
morrelganj
|
201605050
|
1.36
|
1.25
|
|
13.47
|
M/S. Masum Billah Enterprise
|
13.47
|
16/10/2016
|
|
11/04/2019
|
100
|
|
|
22/05/2019
|
|
141
|
IRIDP-2/BGT/DW-66
|
(a) Improvement of Nurullahpur at Sardar Bari-Keshorampur GPS Road (ch.00m-1360m)ID No. 201605038(b) Construction of 2No 1.60mx1.60m Culvert at Ch.200m & 1500m on the Same Road.
|
IRIDP-2
|
morrelganj
|
201605038
|
1.36
|
3.20
|
|
67.29
|
Sardar Jashim
|
65.24
|
06/10/2016
|
|
30/12/2017
|
100
|
|
|
22/05/2019
|
|
142
|
IRIDP-2/BGT/DW-26
|
(a) Improvement of Putikhali U.P - Panchakaran UP via Gazalia bazar from Ch. 3100m-5160m.&5480m-5500m. (b) Construction of 2Nos 0.90x0.90m Culvert at Ch. 4475m & 5225m on the Same Road.
|
IRIDP-2
|
morrelganj
|
201603021
|
2.08
|
1.80
|
|
81.35
|
M/S. S.S. Brothers
|
75.01
|
03/03/2016
|
|
07/08/2016
|
100
|
|
|
21/05/2019
|
|
143
|
IRIDP-2/BGT/DW-27
|
(a) Improvement of Balvhadrapur RHD - Bishkhali GPS Road from Ch. 00m-1170m. (b) Construction of 1No 1.60x1.60m Culvert at Ch. 760m on the Same Road. (c) Construction of 2Nos 4.00x4.0m Culvert at Ch. 157m & 1174m on the Same Road.
|
IRIDP-2
|
morrelganj
|
201604058
|
1.17
|
9.60
|
|
86.24
|
M/S Shahadat Enterprise
|
72.98
|
08/02/2016
|
|
25/09/2016
|
100
|
|
|
21/05/2019
|
|
144
|
IRIDP-2/BGT/DW-61
|
Improvement of Maderdia GPS – Lunch ghat road (Ch.00m - 520m). ID No. 201735086
|
IRIDP-2
|
rampal
|
201735086
|
0.52
|
|
|
27.72
|
M/S. Habib Enterprise
|
29.10
|
06/10/2016
|
|
28/12/2017
|
100
|
|
|
21/05/2019
|
|
145
|
IRIDP-2/BGT/DW-62
|
Improvement of Sarafput – Durgapur – Khayaghat road (Ch.1310m - 1975m). ID No. 201734074
|
IRIDP-2
|
rampal
|
201734074
|
0.67
|
|
|
31.65
|
M/S. Habib Enterprise
|
33.24
|
06/10/2016
|
|
30/12/2017
|
100
|
|
|
21/05/2019
|
|
146
|
IRIDP-2/BGT/DW-85
|
Improvement of Pipulbunia-Kalakher Ber Westpara Road ( Ch.1020m-2670m).ID No. 201734001
|
IRIDP-2
|
rampal
|
201734001
|
1.65
|
|
|
57.02
|
M/S. Amirun Enterprise
|
59.85
|
29/01/2017
|
|
05/03/2019
|
100
|
|
|
21/05/2019
|
|
147
|
IRIDP-2/BGT/DW-86
|
Improvement of Telikhali-Baruipara Road ( Ch.1150m-3300m).ID No. 201734032 & Link 342.0m
|
IRIDP-2
|
rampal
|
201734032
|
2.49
|
|
|
85.64
|
M/S. Bhai Bhai Enterprise
|
89.92
|
15/01/2017
|
|
10/12/2017
|
100
|
|
|
21/05/2019
|
|
148
|
IRIDP-2/BGT/DW-88
|
(a) Improvement of Bujbunia bazar-Sonakur bazar G.C.R.Road ( Ch.00m-1600m).ID No. 201734067b) Construction of 1 No 0.625mx0.600m Culvert at ch. 262m on the Same Road.
|
IRIDP-2
|
rampal
|
201734067
|
1.60
|
0.62
|
|
51.97
|
M/S. Amirun Enterprise
|
54.55
|
29/01/2017
|
|
24/11/2017
|
100
|
|
|
21/05/2019
|
|
149
|
IRIDP-2/BGT/DW-135
|
Improvement of Rajnagor UP via Rajnagor Junior High School-Chalkgona Kheyaghat Road (Ch.2450m-3500m).ID No. 201734037
|
IRIDP-2
|
rampal
|
201734037
|
1.05
|
|
|
44.94
|
M/S. Alif Traders
|
44.49
|
06/12/2018
|
|
20/03/2019
|
100
|
|
|
21/05/2019
|
|
150
|
IRIDP-2/BGT/DW-136
|
Improvement of Mollikerber Mosque - Montu Tallukder House Road (Ch.00m-398m).ID No. 201735101
|
IRIDP-2
|
rampal
|
201735101
|
0.40
|
|
|
38.39
|
M/S. Jhorna Enterprise
|
40.30
|
05/04/2018
|
|
28/11/2018
|
100
|
|
|
21/05/2019
|
|
151
|
IRIDP-2/BGT/DW-137
|
Improvement of Dhakin Mallikerber Khayghat-Daliprara Road (Ch.00m-390m).ID No. 201734088
|
IRIDP-2
|
rampal
|
201734088
|
0.39
|
|
|
11.21
|
M/S. Bebakanandho Enterprise
|
11.74
|
08/08/2018
|
|
05/12/2018
|
100
|
|
|
21/05/2019
|
|
152
|
IRIDP-2/BGT/DW-138
|
(a)Improvement of Tangramari-Garer KhalRoad (Ch.260m-1500m).ID No. 201734112(b) Construction of 02No 0.625mx0.60m Culvert at Ch.900m&1110m on the Same Road.
|
IRIDP-2
|
rampal
|
201734112
|
1.24
|
1.25
|
|
68.31
|
M/S. Shovo Enterprise
|
68.29
|
04/01/2018
|
|
06/05/2018
|
100
|
|
|
21/05/2019
|
|
153
|
IRIDP-2/BGT/DW-139
|
(a)Improvement of Horishova Mondir - Bedan babu House (Orabunia) road (Ch.00m-450m).ID No. 201735188b) Construction of 01No 0.625mx0.60m Culvert at Ch.700m on the Same Road.
|
IRIDP-2
|
rampal
|
201735188
|
0.45
|
0.62
|
|
16.07
|
M/S. Sohel Enterprise
|
16.72
|
08/08/2018
|
|
20/11/2018
|
100
|
|
|
21/05/2019
|
|
154
|
IRIDP-2/BGT/DW-142
|
Improvement of Sakurhat zame mosque -Saguna uttaarpara mondir road (Ch.1054m-1640m).ID No. 201734028
|
IRIDP-2
|
rampal
|
201734028
|
0.59
|
|
|
42.60
|
M/S. Shovo Enterprise
|
42.57
|
04/01/2018
|
|
15/03/2018
|
100
|
|
|
21/05/2019
|
|
155
|
IRIDP-2/BGT/DW-143
|
Improvement of Foyla hat-Chaksree GC road (Ch.00m-870m).ID No. 201732004
|
IRIDP-2
|
rampal
|
201732004
|
0.87
|
|
|
19.37
|
M/S. Shovo Enterprise
|
19.35
|
04/06/2018
|
|
15/03/2018
|
100
|
|
|
21/05/2019
|
|
156
|
IRIDP-2/BGT/DW-145
|
(a)Improvement of Vaga Betkata Kali Mondir- Babu Pa Hous via Betkata Hori Mondir road (Ch.00m-775m).ID No. 201735139(b) Construction of 01No 0.625mx0.60m Culvert at Ch.700m on the Same Road.
|
IRIDP-2
|
rampal
|
201735139
|
0.78
|
0.62
|
|
34.53
|
M/S. Shovo Enterprise
|
34.50
|
04/01/2018
|
|
12/03/2018
|
100
|
|
|
21/05/2019
|
|
157
|
IRIDP-2/BGT/DW-147
|
Improvement of Gilatale G.C-Bhospatia UP road (Ch.00m-122m).ID No. 201733002
|
IRIDP-2
|
rampal
|
201733002
|
0.12
|
|
|
21.53
|
M/S. Shovo Enterprise
|
21.51
|
31/12/2017
|
|
10/11/2018
|
100
|
|
|
21/05/2019
|
|
158
|
IRIDP-2/BGT/DW-148
|
Improvement of Kundopara Durga Mondir- Shreefaltola Bottola road (Ch.00m-660m).ID No. 201735070
|
IRIDP-2
|
rampal
|
201735070
|
0.64
|
|
|
46.20
|
M/S Khandakar Brothers
|
45.90
|
08/04/2018
|
|
10/04/2019
|
100
|
|
|
21/05/2019
|
|
159
|
IRIDP-2/BGT/DW-87
|
Improvement of Mongla-Mithakhali-Mollikerber Road (Rampal portion)Road ( Ch.7055m-8250m).ID No. 201732009
|
IRIDP-2
|
rampal
|
201732009
|
1.20
|
|
|
57.08
|
M/S. Amirun Enterprise
|
59.92
|
29/01/2017
|
|
19/12/2018
|
100
|
|
|
21/05/2019
|
|
160
|
IRIDP-2/BGT/DW-60
|
Improvement of Srifaltala new market – Veternary hospital via sarner field road (Ch.00m - 1900m). ID No. 201734139
|
IRIDP-2
|
rampal
|
201734139
|
1.90
|
|
|
146.56
|
M/S. Himel Enterprise
|
130.42
|
10/10/2016
|
|
|
0
|
|
|
21/05/2019
|
|
161
|
IRIDP-2/BGT/DW-140
|
Improvement of Foyla Bazar Kundo Para moar - Biman Bondor road (Ch.610m-875m).ID No. 201735124
|
IRIDP-2
|
rampal
|
201735124
|
0.27
|
|
|
11.78
|
M/S. Molla Enterprise
|
11.30
|
08/02/2018
|
|
14/11/2018
|
40
|
|
|
21/05/2019
|
|
162
|
IRIDP-2/BGT/DW-141
|
(a)Improvement of Bhojpatia Uttar Para Road (Ch.00m-750m).ID No. 201735016b) Construction of 01No 0.625mx0.60m Culvert at Ch.650m on the Same Road.
|
IRIDP-2
|
rampal
|
201735016
|
0.75
|
0.62
|
|
38.42
|
|