1
|
BDIRWSP/BAR/BAK/DW-12
|
Widening & Strengthening of Bakergonj-Gobindopur Hat. [From RHD Bakerganj-Gobindopur via Rabipur, Shialguni, Kakorda, Vathshala Kalisuri road at Ch. 5590-17248m including 05 Nos. 4.00mx4.00m RCC Box Culvert at 6562m, 7933m, 9041m, 15050m & 16158m under Bakerganj Upazila, District-Barishal. Road ID No: 506072002. Salvage Materials Cost Tk. 4846796.00
|
BDIRWSP
|
bakerganj
|
506072002
|
11.66
|
|
|
2417.06
|
EFTE.ETCL (PVT.) LIMITED-M/S. Amir Engineering Corporation (JV), Horinpala, Bhandaria, Pirojpur & College Row, Barisal, Bangladesh
|
2175.35
|
|
|
|
0
|
|
|
18/11/2024
|
|
2
|
BDIRWSP/BAR/BAN/DW-01
|
Widening & Strengthening of Chowmohona GC via Biserkandi, Umarerper, Baitakghata, Wazedia- RHD (Baisari) road at Ch. 6407-15746m and RCC Road-100m (Ch. 12614-12714m wazidia bazar) including 01 No. 1-vent 4.00mx4.00m RCC Box Culvert at ch. 15634m and 03 Nos. 1.00mx1.00m RCC Box Culvert at ch. 7480m, 10878m & 13274m and 01 No. Double vent 4.00mx4.00m RCC Box Culvert at ch. 15739m under Banaripara Upazila, District-Barishal. Road ID No: 506102001. Salvage Materials Cost Tk. 20504124.00
|
BDIRWSP
|
banaripara
|
506102001
|
9.34
|
|
|
2518.42
|
M/S. Kohinoor Enterprise Dadpur Lodge, Kawnia 1st Lane, Barishal Sadar, Barishal
|
2266.58
|
|
|
|
0
|
|
|
11/11/2024
|
|
3
|
BDIRWSP/BAR/BAN/DW-02
|
Widening & Strengthening of (Danduat) RHD via Bangla Bazar, Aower Hat.-Harta GC road at Ch. 0.00-5000m including 01 No. 1.00mx1.00m RCC Box Culvert at ch. 1008m and 02 Nos. 2.00mx2.00m RCC Box Culvert at ch. 1338m & 7734m and 03 Nos. 1-vent 3.00mx3.00m RCC Box Culvert at ch. 757m, 1700m & 4830m and 01 No. 1-vent 4.00mx4.00m RCC Box Culvert at ch. 2350m under Banaripara Upazila, District-Barishal. Road ID No: 506102003. Salvage Materials Cost Tk. 6024928.00
|
BDIRWSP
|
banaripara
|
506102003
|
5.00
|
|
|
1741.92
|
M/S. Kohinoor Enterprise Dadpur Lodge, Kawnia 1st Lane, Barishal Sadar, Barishal
|
1567.73
|
|
|
|
0
|
|
|
11/11/2024
|
|
4
|
BDIRWSP/BAR/SAD/DW-13
|
Widening & Strengthening of Charkawa Karnokati to Ranirhat via Napter hat , Char Aicha Poler hat road at Ch. 3941 - 8036m & 180m RCC Road including 02 Nos. 2.00m x 2.00m RCC Box Culvert at Ch. 4135m & 4357m under Sadar Upazila, District : Barishal. [Salvage Materials Cost Tk. 1008277] [Road ID No. 506512005].
|
BDIRWSP
|
barishal-s
|
506512005
|
4.10
|
|
|
770.35
|
M/S Dhara Enterprise-MS Upakul ConstructionJV, Baptist Mission Road, Barisal
|
393.32
|
|
|
|
0
|
|
|
30/01/2025
|
|
5
|
BDIRWSP/BAR/SAD/DW-14
|
Part 1 : Construction for the vertical Extension of Office Building of Additional Chief Engineer, Barishal Division, LGED, Barishal. Part 2 : Construction for the vertical Extension of Office Building cum Dormitory Bhaban of Executive Engineer, LGED, Barishal. [Package No : BDIRWSP/BAR/SAD/DW- 14]
|
BDIRWSP
|
barishal-s
|
|
|
|
|
1094.45
|
M/S. Amir Engineering Corporation, College Row, Barisal, Bangladesh
|
1070.04
|
|
|
|
0
|
|
|
18/11/2024
|
|
6
|
BDIRWSP/BAR/MEH/DW-08
|
Widening & Strengthening of Shaestabad GC (Barisal Sadar)- Hizla Upzila HQ Via Gazirhat, Kazirhat GC, Miarhat & Ekkoterhat road at Ch. 10000-14700m and 150m RCC Road (Gabtoli Bazar portion Ch. 12273-12423m) under Mehendiganj Upazila, District-barishal. Road ID No: 506622008. Salvage Materials Cost Tk. 1846750.00
|
BDIRWSP
|
mehendiganj
|
506622008
|
4.70
|
|
|
977.70
|
M/S. Kohinoor Enterprise, Dadpur Lodge, Kawnia 1st Lane, Barishal Sadar, Barishal
|
879.93
|
|
|
|
0
|
|
|
18/11/2024
|
|
7
|
BDIRWSP/BAR/MEH/DW-09
|
Widening & Strengthening of Ulania GC-Aliganj GC Road (Mehendigonj part) road at Ch. 0.00-3000m including 01 No. 4.00mx4.00m RCC Box Culvert at 2412m under Mehendiganj Upazila, District-barishal. Road ID No: 506622007. Salvage Materials Cost Tk. 6468993.00
|
BDIRWSP
|
mehendiganj
|
506622007
|
3.00
|
|
|
892.96
|
M/S. Amir Engineering Corporation College Row, Barisal, Bangladesh
|
803.67
|
|
|
|
0
|
|
|
11/11/2024
|
|
8
|
BDIRWSP/BAR/MEH/DW-10
|
Widening & Strengthening of Ulania GC-Aliganj GC Road (Mehendigonj part) road at Ch. 3000-5600m including 03 No. 2.00mx2.00m RCC Box Culvert at3155m, 3922m & 4655m under Mehendiganj Upazila, District-barishal. Road ID No: 506622007. Salvage Materials Cost Tk. 4948400.00
|
BDIRWSP
|
mehendiganj
|
506622007
|
2.60
|
|
|
787.12
|
M/S. Amir Engineering Corporation College Row, Barisal, Bangladesh
|
757.99
|
|
|
|
0
|
|
|
11/11/2024
|
|
9
|
BDIRWSP/BAR/MEH/DW-06
|
Widening & Strengthening of Shaestabad GC (Barisal Sadar)- Hizla Upzila HQ Via Gazirhat, Kazirhat GC, Miarhat & Ekkoterhat road at Ch. 300-5200m and 235m RCC Road (Dafader Bazar portion Ch. 3150-3385m & 50m RCC Road (Banghata Bazar portion Ch. 5150-5200m) including 01 No. 2.00mx2.00m RCC Box Culvert at 668m under Mehendiganj Upazila, District-barishal. Road ID No: 506622008. Salvage Materials Cost Tk. 1908322.00
|
BDIRWSP
|
mehendiganj
|
506622008
|
2.20
|
|
|
1083.61
|
M/S. Kohinoor Enterprise, Dadpur Lodge, Kawnia 1st Lane, Barishal Sadar, Barishal
|
975.25
|
|
|
|
0
|
|
|
11/11/2024
|
|
10
|
BDIRWSP/BAR/MEH/DW-07
|
Widening & Strengthening of Shaestabad GC (Barisal Sadar)- Hizla Upzila HQ Via Gazirhat, Kazirhat GC, Miarhat & Ekkoterhat road at Ch. 5200-10000m and 100m RCC Road (Banghata Bazar portion Ch. 5200-5300m) under Mehendiganj Upazila, District-barishal. Road ID No: 506622008. Salvage Materials Cost Tk. 1865023.00
|
BDIRWSP
|
mehendiganj
|
506622008
|
4.80
|
|
|
943.31
|
M/S. Kohinoor Enterprise, Dadpur Lodge, Kawnia 1st Lane, Barishal Sadar, Barishal
|
848.98
|
|
|
|
0
|
|
|
11/11/2024
|
|
11
|
BDIRWSP/BAR/MUL/DW-11
|
Widening & Strengthening of Muladi GC- Talukder Hat- Bashtala Bazar- Mirdar Hat upto Muladi Boarder road at Ch. 5640-9840m including 03 Nos. Double Vent- 4.00mx4.00m RCC Box Culvert at 7200m, 8250m & 9120m and 02 Nos. Single Vent- 3.00mx3.00m RCC Box Culvert at 5700m & 6700m and 01 No. Single Vent- 4.00mx4.00m RCC Box Culvert at 6000m under Muladi Upazila, District-barishal. Road ID No: 506692001. Salvage Materials Cost Tk. 1055990.00
|
BDIRWSP
|
muladi
|
506692001
|
4.20
|
|
|
1111.48
|
Mohammed Eunus & Brothers (Pvt.) Ltd. Fortune Mall (7th Fl.), Baizid Bostami Road, Nasirabad, Panchlaish, Chattogram
|
1000.33
|
|
|
|
0
|
|
|
18/11/2024
|
|
12
|
BDIRWSP/BAR/UZI/DW- 15
|
Widening & Strengthening of Dhamura GC (Post Office) - Sholak Bazar - Batajore R & H road at Ch. 0.00m - 3620m including 06 Nos. 0.900m x 0.900m RCC Box Culvert at Ch.885m, 1395m, 1947m, 3385m , 3483m & 3770m and 05 Nos. 2.00m x 2.00m RCC Box Culvert at Ch.123m, 743m, 1620m, 2014m & 3303m and 1 No.2-vent 4.00m x 4.00m RCC Box Culvert at Ch.2411m under Uzirpur Upazila, District : Barishal. [Salvage Materials Cost Tk. 2980155.00] [Road ID No. 506942005].
|
BDIRWSP
|
uzirpur
|
506942005
|
3.62
|
|
|
1299.71
|
Barendra Construction Ltd. H-146, Shaheb Bazar, Ghoramara; Boalia PS; Rajshahi
|
1169.74
|
|
|
|
0
|
|
|
30/01/2025
|
|
13
|
BDIRWSP/BAR/UZI/DW-03
|
Widening & Strengthening of Sanuhar R& H -Dhamura GC- Jalla- Satla GC Road at Ch. 0.00-8000m including 06 Nos. 0.900mx0.900m Drainage Culvert at Ch. 735m, 1210m, 3080m, 5800m, 6581m & 7950m and 01 No. 2.00mx2.00m RCC Box Culvert at Ch. 6764m under Uzirpur Upazila, District-Barishal. Road ID No: 506942003. Salvage Materials Cost Tk. 3040750.00
|
BDIRWSP
|
uzirpur
|
506942003
|
8.00
|
|
|
1764.44
|
EFTE.ETCL (PVT.) LIMITED Horinpala, Bhandaria, Pirojpur
|
1588.00
|
|
|
|
0
|
|
|
11/11/2024
|
|
14
|
BDIRWSP/BAR/UZI/DW-04
|
Widening & Strengthening of Sanuhar R& H -Dhamura GC- Jalla- Satla GC Road at Ch. 8000-15000m under Uzirpur Upazila, District-Barishal. Road ID No: 506942003. Salvage Materials Cost Tk. 2324241.00
|
BDIRWSP
|
uzirpur
|
506942003
|
7.00
|
|
|
1498.43
|
EFTE.ETCL (PVT.) LIMITED Horinpala, Bhandaria, Pirojpur
|
1348.59
|
|
|
|
0
|
|
|
11/11/2024
|
|
15
|
BDIRWSP/BAR/UZI/DW-05
|
Widening & Strengthening of Sanuhar R& H -Dhamura GC- Jalla- Satla GC Road at Ch. 15000-22965m under Uzirpur Upazila, District-Barishal. Road ID No: 506942003. Salvage Materials Cost Tk. 1897465.00
|
BDIRWSP
|
uzirpur
|
506942003
|
7.97
|
|
|
1884.66
|
M. M. Builders & Engineers Ltd-M/S. Amir Engineering Corporation (JV)
|
1696.19
|
|
|
|
0
|
|
|
11/11/2024
|
|
16
|
BDRIDP/BAR/AGL/CCA-Rd/02
|
Improvement of Road from Seral-Goila road viaShahid Serniabad House- Tamer Jame Mosjid (Tamer Girls High School - Seral Community Center by BC From Ch. 0.0m-975m under Agailjhara Upazila,Barisal.
|
BDRIDP
|
agailjhara
|
|
0.98
|
|
|
55.27
|
M/S Mitushi Traders
|
45.84
|
|
|
|
100
|
|
|
08/04/2019
|
|
17
|
BDRIDP/BAR/AGL/CCA-Rd/08
|
Improvement of road from Hazi Mokbul Sardar House via Sardar Mohabubul Alom & Sardar Harun - Jainger Gomosta House road. at Ch.00 to 208m under Agailjhara Upazila Barisal.
|
BDRIDP
|
agailjhara
|
|
0.21
|
|
|
21.68
|
M/S Sharif Enterprise
|
22.77
|
|
22/03/2018
|
22/09/2018
|
100
|
|
|
08/04/2019
|
|
18
|
BDRIDP/BAR/AGL/Gha/01
|
Construction of Ghat at Paisarhat Paschim par under Agailjhara Upazila Barisal
|
BDRIDP
|
agailjhara
|
|
|
|
|
29.00
|
M/S Sharif Enterprise
|
29.58
|
|
29/03/2018
|
29/09/2018
|
60
|
|
|
08/04/2019
|
|
19
|
BDRIDP/BAR/AGL/UZ-RdR/03
|
Maintenance of Barthi- Valiukshi-Magura Bakal Hat Roada Earthwark from Ch. 9860- 11860m.b Carpeting DC 21.3 sqm.c 12mm SC-5237.7 sqm. d Palisading Work 103.00m. Under Agailjhara Upazila District- Barishal.
|
BDRIDP
|
agailjhara
|
506022008
|
|
|
|
1265178.00
|
|
0.00
|
|
|
|
0
|
|
|
08/04/2019
|
|
20
|
BDRIDP/BAR/AGL/ UZ-RdR/04
|
Maintenance of Road From Nimtola RHD-Dhamura GC viaRatnapur UP Road at Ch 5265m-7383m Agailjhara Under Agailjhara Upazila District- Barishal.
|
BDRIDP
|
agailjhara
|
506022010
|
|
|
|
2249883.00
|
|
0.00
|
|
|
|
0
|
|
|
08/04/2019
|
|
21
|
BDRIDP/BAR/AGL/UN-RdR/03
|
Maintenance of Road From Goila UP Office to Billogram Bazar via Rajer Bari Road at Ch 00m-2000mm Agailjhara Under Agailjhara Upazila District- Barishal.
|
BDRIDP
|
agailjhara
|
506023008
|
|
|
|
2890888.00
|
|
0.00
|
|
|
|
0
|
|
|
08/04/2019
|
|
22
|
BDRIDP/BAR/AGL/UN-RdR/02
|
Maintenance of Road From Basail Hat Rajihar UP-Batra Bazar viiiia Basail Pachchim Para Bazar Road at Ch 00m-1000m Agailjhara Under Agailjhara Upazila District - Barishal.
|
BDRIDP
|
agailjhara
|
506023006
|
|
|
|
3511387.00
|
|
0.00
|
|
|
|
0
|
|
|
08/04/2019
|
|
23
|
BDRIDP/ BAR/AGL/ CCA-Rd/09
|
A Improvement of Temar Bastaila Nagar GPS-West Mollapara-Ohchiarmad Bazar. i Earthwark Ch.650m-1865m.ii Carpeting DC Ch. 650m-1865m. iii Palsading 641m.B Choto Basail Kander Bepari House to East Valukshi Bridge.Salvaged Cost Tk 37835.00i Earthwark Ch.0.00m-360m.ii Carpeting DC Ch.0.00m-360m. iii Palsading 120m. Under Agailjhara upazila District Barishal.
|
BDRIDP
|
agailjhara
|
"506024009 506025045 "
|
|
|
|
15112800.00
|
|
0.00
|
|
|
|
0
|
|
|
08/04/2019
|
|
24
|
BDRIDP/BAR /AGL/CCA-Rd/01
|
Improvement of Road by BC from Rathkhola Bazar-Bhadrapara Road (ch. 0m-1000m) Under Agailjhara Upazila, District-Barisal.
|
BDRIDP
|
agailjhara
|
|
1.00
|
|
|
50.98
|
M/S Talukder Enterprise
|
56.00
|
|
30/10/2014
|
30/04/2015
|
100
|
|
|
|
|
25
|
BDRIDP/BAR/AGL/CCA-Rd(R)/06
|
Rehabilitation of road from Temar Bastala to Hawla bridge via Nagar GPS-Talbazar-Oichermath bazar road by BC from Ch. 3840m-4840m with 3 Nos U-Drain at Ch. 4410m, 4590m & 4740m.
|
BDRIDP
|
agailjhara
|
|
1.00
|
|
|
49.14
|
M/S Sharif Enterprise
|
51.58
|
|
29/04/2015
|
28/01/2016
|
100
|
|
|
|
|
26
|
BDRIDP/BAR/AGL/CCA-St/01
|
Construction of road from 2 vent 4.00m×4.00m RCC Box Culvert on Ashkor Puraton Kalibari Baily Bridge to Kishore Bissas's house road at Ch. 841m with Dranage Culvert at Ch. 930m.
|
BDRIDP
|
agailjhara
|
|
|
|
|
16.78
|
M/S Sharif Enterprise
|
17.72
|
|
|
|
100
|
|
|
|
|
27
|
BDRIDP/BAR/AGL/UN-Rd(R)/01
|
Rehabilitation of road from Goila (DR) to Teimukhi via Bakal hat & Kodaldhoa bazar road by BC form Ch. 11192m-13954m.
|
BDRIDP
|
agailjhara
|
|
2.76
|
|
|
147.39
|
M/S Sharif Enterprise
|
155.93
|
|
|
30/05/2015
|
100
|
|
|
|
|
28
|
BDRIDP/BAR/AGL/UZ-Rd/02
|
Improvement of road from Paisharhat GC to Shatla GC via Bagdha GC road by BC from Ch. 3800m-5800m.
|
BDRIDP
|
agailjhara
|
|
2.00
|
|
|
107.71
|
M/S Sraboni Construction
|
112.88
|
|
|
|
100
|
|
|
|
|
29
|
BDRIDP/BAR/AGL/CCA-Rd/03
|
Improvement of road from Boro Magra Sluice to Ramshil Bazar via Kodaldhoa road by BC from Ch. 0.00m-1000m with on Boromagra Stuice to Ramshil Bazar via Dodaldhoa road from Ch. 280m
|
BDRIDP
|
agailjhara
|
|
1.00
|
|
|
60.17
|
M/S Sarniabad Enterprise
|
63.76
|
|
|
|
100
|
|
|
|
|
30
|
BDRIDP/BAR/AGL/CCA-Rd/04
|
Improvement of road from Poiser hat GC-Ramshil Bazar via Trimukhi road by BC from Ch. 0.00m-1000m.
|
BDRIDP
|
agailjhara
|
|
1.00
|
|
|
49.26
|
M/S Shafique Brothers
|
55.39
|
|
28/05/2015
|
28/11/2015
|
100
|
|
|
|
|
31
|
BDRIDP/BAR/AGL/CCA-Rd(R)/05
|
Rehabilitation of road from Ashkor Puraton Kalibari Baily Bridge to Kishore Bissas's house road from Ch. 0.00m-1200m.
|
BDRIDP
|
agailjhara
|
|
1.20
|
|
|
41.59
|
M/S Helal Traders
|
44.00
|
|
|
|
100
|
|
|
|
|
32
|
BDRIDP/BAR/AGL/UZ-Rd(R)/01
|
Rehabilitation of Barthi - Valukshi - Magura- Ambari-Bakalhat road by BC at ch.5870-7880m.
|
BDRIDP
|
agailjhara
|
|
2.01
|
|
|
127.47
|
M/S Santu Traders
|
133.83
|
|
15/07/2015
|
14/07/2016
|
100
|
|
|
|
|
33
|
BDRIDP/BAR/AGL/CCA-Rd/07
|
Improvement of road from Biplob Serniabad House to Hazi Musa House road By BC from ch.00-400m.
|
BDRIDP
|
agailjhara
|
|
0.40
|
|
|
19.17
|
M/S Serniabad Enterprise
|
20.13
|
|
|
|
100
|
|
|
|
|
34
|
BDRIDP/BAR/AGL/CCA-Rd/ 02
|
Improvement of road from Seral - Goila road via Shahid Serniabad House - Tamer Jame Mosjid(Tamer Girls High School-Seral Community Center) by BC (Ch.0.0 - 975m) under Agailjhara Upazila,Barisal.
|
BDRIDP
|
agailjhara
|
|
0.98
|
|
|
72.33
|
M/S Serniabad Traders
|
72.30
|
|
16/03/2017
|
16/10/2017
|
100
|
|
|
|
|
35
|
BDRIDP/BAR/AGL/CCA-EW/01
|
Resectioning of Road from Seral-Goila road via Shahid Serniabad House-Tamer Jame Mosjid (Tamer Girls High School-Seral Community Center) by Earth at Ch. 0.00m-975m.
|
BDRIDP
|
agailjhara
|
|
0.98
|
|
|
3.18
|
Md. Babul Sikder
|
3.18
|
|
30/03/2017
|
30/04/2017
|
100
|
|
|
|
|
36
|
BDRIDP/BAR/AGL/CCA-EW/02
|
Improvement of road from Ashkor Puraton Kalibari Baily Bridge to Kishore Bissas’s House by Earth work from Ch. 00-1200m under Agailjhara Upazila, Barisal.
|
BDRIDP
|
agailjhara
|
|
1.20
|
|
|
4.49
|
Abdul Hakim Molla
LCS No-1
|
2.17
|
|
|
30/04/2015
|
100
|
|
|
|
|
37
|
BDRIDP/BAR/AGL/CCA-EW/03
|
Resectioning of road from Temar Bastala to Hawla Bridge via Nagar GPS-Talbazar-lichermath Bazar road from Ch. 3840-4840m.
|
BDRIDP
|
agailjhara
|
|
1.00
|
|
|
3.45
|
Nolini Halder
LCS No-1
|
3.45
|
|
15/01/2017
|
30/04/2017
|
100
|
|
|
|
|
38
|
BDRIDP/BAR/AGL/UZ-EW/01
|
Improvement of road from Paisharhat GC to Shatla GC via Bagdha GC road by Earth work from Ch. 3800-5800m under Agailjhara Upazila, Barisal.
|
BDRIDP
|
agailjhara
|
|
2.00
|
|
|
10.92
|
Md. Sohrab Howlader
LCS No-1
|
1.24
|
|
20/02/2015
|
30/04/2015
|
100
|
|
|
|
|
39
|
BDRIDP/BAR/AGL/UN-EW/01
|
Improvement of road from Goila (DR) to Teimukhi via Bakal hat & Kodaldhoa bazar road by Earth work form Ch. 11192-13954m under Agailjhara Upazila, Barisal.
|
BDRIDP
|
agailjhara
|
|
2.76
|
|
|
16.05
|
Mahim Baishnab
LCS No-1
|
2.01
|
|
20/02/2015
|
30/04/2015
|
100
|
|
|
|
|
40
|
|
|
BDRIDP
|
agailjhara
|
|
|
|
|
16.05
|
Pangkoj Joydhor
LCS No-7
|
2.06
|
|
20/02/2015
|
30/04/2015
|
100
|
|
|
|
|
41
|
BDRIDP/BAR/BAB/CCA-RdR/06
|
Improvement of Road from Telerchar GPS -Najamrari Bari - Jahungirnagar UP road Start ch.1700m Satter Mirar Bari -Thakur. From Ch.0.0m - 550mSalvaged Cost Tk 192766.00
|
BDRIDP
|
babuganj
|
"506035103 506034109"
|
|
|
|
35.08
|
M/S Niaz Traders
|
31.57
|
|
18/01/2018
|
18/07/2018
|
50
|
|
|
08/04/2019
|
|
42
|
BDRIDP/BAR/BAB/CCA-Rd/07
|
Improvement of road from Jahapur Shilondia Bridge -Uttor Mujafforpur Peda Master bari under Jahangir Nagar Union a Bituminous Surfacing -wearing courseDC ch.190m -1190m b 1No. 2.0m x 2.0m & 1No.1.0m x1.0m RCC Box Culvert at Ch.273m & 615m under Babuganj U
|
BDRIDP
|
babuganj
|
506035018
|
1.00
|
|
|
69.55
|
M/S Amir Engineering Corporation
|
64.50
|
|
|
|
100
|
|
|
08/04/2019
|
|
43
|
BDRIDP/BAR/BAB/UN-Ew/01
|
Improvement of road from Dehergothi UP office to Kalir Bazar road by Earth Work from Ch. 1960m-3710m.
|
BDRIDP
|
babuganj
|
|
1.75
|
|
|
1.96
|
Md. Masum Hossain GaziLCS No-1
|
1.96
|
|
15/05/2015
|
30/09/2015
|
100
|
|
|
08/04/2019
|
|
44
|
BDRIDP/BAR/BAB/CCA-Ew/01
|
Improvement of road Shajahan Sikder Farm to Najam Mridha House via Idel Kathi High School By Earth Work under Dehergothi UP at Ch. 0.00m-2+350km.
|
BDRIDP
|
babuganj
|
|
2.35
|
|
|
2.85
|
TaslimaLCS No-1
|
2.85
|
|
15/05/2015
|
30/09/2015
|
100
|
|
|
08/04/2019
|
|
45
|
BDRIDP/BAR/BAB/CCA-Ew/02
|
Improvement of road Dehergothi in High School-Rahamotpur Krishi College via Khalik member's house by Earth Work under Dehergothi UP at Ch. 0.00m-4+320km.
|
BDRIDP
|
babuganj
|
|
4.32
|
|
|
3.81
|
Rajib HossainLCS No-1
|
3.81
|
|
15/05/2015
|
30/09/2015
|
80
|
|
|
08/04/2019
|
|
46
|
BDRIDP/BAR/BAB/CCA-Ew/03
|
Improvement of road Jayinpur madrasha to Dhaka Barisal RHD via Molla Bari by Earth Work under Dehergothi UP at Ch. 0.00m-2+600km.
|
BDRIDP
|
babuganj
|
|
2.60
|
|
|
3.01
|
Md. Liton HossainLCS No-1
|
3.01
|
|
15/05/2015
|
30/09/2015
|
100
|
|
|
08/04/2019
|
|
47
|
BDRIDP/BAR/BAB/CCA-EW/04
|
Improvement of road From Daroger hat to Shandha river bank via Battala Bazar road by Earth work from Ch. 0.00m-3900m.
|
BDRIDP
|
babuganj
|
|
3.90
|
|
|
3.55
|
Md. Kabir SikderLCS No-1
|
3.55
|
|
15/05/2015
|
30/09/2015
|
100
|
|
|
08/04/2019
|
|
48
|
BDRIDP/ BAR/BAB/ CCA-Rd/08
|
Improvement of Road from Ramjankathi GPS to Charalgi GPS. a Earthwark from Ch. 0- 1500m.b Carpeting DC from Ch. 0- 1500m.c Construction of 2 Nos 625mmx600mm U-Drain at Ch. 736m & 1285m.d Palisading Work 150.00m. Under Babuganj District- Barishal.
|
BDRIDP
|
babuganj
|
506035132
|
|
|
|
11562581.00
|
|
0.00
|
|
|
|
0
|
|
|
08/04/2019
|
|
49
|
BDRIDP/ BAR/BAB/ CCA-Rd/09
|
Improvement of from Khudrokathi Freedom Fighter Mogibor Rahaman Sikder House to Baige Comander Abdul Mojid Khan house. At Ch. 00m-1100m.Salvaged Cost Tk 285357.00i Earthwark Ch.0.00m-1100m.ii Carpeting DC Ch.0.00m-1100m. iii Construction of 02 Nos 0.625mx0.600m U-Drain. at Ch.110m & 400m.iv Palsading 46m.Under Babuganj Upazila Barishal District.
|
BDRIDP
|
babuganj
|
506034155
|
|
|
|
7945251.00
|
|
0.00
|
|
|
|
0
|
|
|
08/04/2019
|
|
50
|
BDRIDP/BAR/BABU/CCA-Rd/01
|
Improvement of road from Babugonj Agorpur GC to Mr. Younusur Rahman (Divisional Commissioner) house via Clubgonj hat by Carpeting from Ch. 750-1400m & 0.00-1550m.
|
BDRIDP
|
babuganj
|
|
0.80
|
|
|
97.92
|
M/S Lutful Kobir
|
107.50
|
|
17/07/2014
|
16/04/2015
|
100
|
|
|
|
|
51
|
BDRIDP/BAR/BAB/CCA-Rd(R)/02
|
Rehabilitation of road Shajahan Sikder Farm to Najam Mridha House via idel Kathi High School by Carpeting under dehergothi UP at Ch 00-2+350km.
|
BDRIDP
|
babuganj
|
|
2.35
|
|
|
97.19
|
M/S Atique Construction
|
101.73
|
|
|
|
100
|
|
|
|
|
52
|
BDRIDP/BAR/BAB/CCA-Rd(R)/03
|
Rehabilitation of road Dehergothi in High School-Rahamotpur Krishi College via Khalik member's house by Carpeting under Dehergoti UP at Ch. 00m-4+320km
|
BDRIDP
|
babuganj
|
|
4.32
|
|
|
185.18
|
M/S Atique Construction
|
193.87
|
|
|
|
100
|
|
|
|
|
53
|
BDRIDP/BAR/BABU/CCA-Rd/04
|
Improvement of road Jayinpur Madrasha to Dhaka Barisal RHD via Molla Bari by Carpeting under dehergoti UP at Ch. 00-2+600km.
|
BDRIDP
|
babuganj
|
|
2.60
|
|
|
99.59
|
M/S Atique Construction
|
104.29
|
|
|
|
100
|
|
|
|
|
54
|
BDRIDP/BAR/BAB/CCA-St/01
|
Construction of 4Nos RCC Box Culvert on road Shajahan Sikder Farm to Najam Mridha House via Idel Kathi High School Under Dehergothi UP at Ch 248m, 715m, 1414m & 1543m.
|
BDRIDP
|
babuganj
|
|
|
|
|
29.32
|
M/S Atique Construction
|
30.71
|
|
|
|
100
|
|
|
|
|
55
|
BDRIDP/BAR/BAB/CCA-St/02
|
Construction of 11Nos RCC Box Culvert on road from Dehergothi in High school-Rahamotpur Krishi College via Khalik member's house under Dehergothi UP at Ch. 797m, 1455m, 1602m, 1875m, 1965m, 2362m, 2535m, 2655m, 4140m & Link road 2250m & 380m.
|
BDRIDP
|
babuganj
|
|
|
|
|
47.44
|
M/S Atique Construction
|
49.69
|
|
|
|
100
|
|
|
|
|
56
|
BDRIDP/BAR/BAB/CCA-St/03
|
Construction of 5Nos RCC Box Culvert on road Jayipuri Madrasha to Dhaka Barisal RHD via Molla Bari Under Dehergothi UP at Ch. 1135m, 1612m, 2272m, 2375m, 2540m.
|
BDRIDP
|
babuganj
|
|
|
|
|
20.01
|
M/S Atique Construction
|
20.96
|
|
|
|
100
|
|
|
|
|
57
|
BDRIDP/BAR/BAB/CCA-St/04
|
Construction of 3.00m×3.00m 3 Nos 1.00m×1.00m 1Nos 2.00m×2.00m RCC Box Culvert on Daroger hat to Shandha river bank via Battala Bazar road at Ch. 33m, 2820m, 2980m, 3155m & 1785m.
|
BDRIDP
|
babuganj
|
|
|
|
|
19.82
|
M/S Atique Construction
|
20.76
|
|
|
|
100
|
|
|
|
|
58
|
BDRIDP/BAR/BAB/UN-St/01
|
Construction of 2 Nos 2.00×2.00m 1 No 1.60m×1.60m 1No 1.00m×1.00m RCC Box Culvert on Dehergothi UP office to Kalir Bazar road at Ch. 2475m, 2693m, 2860m & 3035m.
|
BDRIDP
|
babuganj
|
|
|
|
|
14.43
|
M/S Lutful Kobir
|
10.30
|
|
|
25/10/2015
|
100
|
|
|
|
|
59
|
BDRIDP/BAR/BAB/UN-Rd(R)/01
|
Rehabilitation of road from Dehergothi UP office to Kalir Bazar by BC from Ch. 1930m-3710m.
|
BDRIDP
|
babuganj
|
|
1.78
|
|
|
64.57
|
M/S Alvi Construction
|
51.94
|
|
|
|
100
|
|
|
|
|
60
|
BDRIDP/BAR/BAB/CCA-Rd/05
|
Improvement of road from Daroger hat to Shandha river bank via Battala bazar road By BC from Ch. 00-3800m under Babuganj Upazila, Barisal District.
|
BDRIDP
|
babuganj
|
|
3.80
|
|
|
143.08
|
M/S Atique Construction
|
149.79
|
|
|
|
100
|
|
|
|
|
61
|
BDRIDP/BAR/BAB/UN-RD/02
|
Improvement of Road from Agorpur UP Office (Chairman Hat) to Miar Hat via Jahapur under Jahangirnagor (Agorpur) UP at Ch. 0.00m-2110m
|
BDRIDP
|
babuganj
|
|
2.11
|
|
|
124.21
|
M/S Hasan Construction
|
115.70
|
|
29/11/2016
|
28/06/2017
|
100
|
|
|
|
|
62
|
BDRIDP/BAR/BAB/UN-St/02
|
Construction of No 6.00m Span OFC, 3 Nos 2.00m×2.00m & 2 Nos 1.60m×1.60m RCC Box Culvert on Road From Agorpur UP Office (Chairman Hat) to Miar Hat via Jahapur under Jahangirnagor (Agorpur) UP at Ch. 0.00m, 0.00m, 125m, 1101m, 1907m & 708m.
|
BDRIDP
|
babuganj
|
|
|
|
|
41.83
|
M/S Saifuddin Traders
|
41.80
|
|
20/11/2016
|
19/09/2017
|
100
|
|
|
|
|
63
|
BDRIDP/BAR/BAB/UN-EW/02
|
Resectioning of Road from Agorpur UP Office (Chairman Hat) to Miar Hat via Jahapur under Jahangirnagor (Agorpur) UP at Ch. 0.00m-2110m
|
BDRIDP
|
babuganj
|
|
2.11
|
|
|
2.91
|
Md. Habibur Rohman
LCS No-1
|
2.91
|
|
20/06/2016
|
20/10/2016
|
100
|
|
|
|
|
64
|
BDRIDP/BAR/BAK/CCA-Rd/01
|
Improvement of road from South side Dhola Sluice Gate to Alim Meridha Bari (Vary) via Sikder Bari, Manik Member Bari, Shatghor & Mannan Princhpal Bari (East side of Hanua Bridge to Shatghor via Shikder Bari) By HBB from Ch. 0.00-1013m.
|
BDRIDP
|
bakerganj
|
506075221
|
1.01
|
|
|
35.59
|
M/S Nahid Enterprise
|
39.86
|
|
24/07/2014
|
24/01/2015
|
100
|
|
|
08/04/2019
|
|
65
|
BDRIDP/BAR/BAK/UN-Rd(R)/01
|
Rehabilitation of Road from Kalaskati UP Office (Vumi Office) to Arshed Khayaghat via Kumarbari Bridge & Bagdia GPS road By BC from Ch. 00-1000m. (Salvage Cost Tk. 9,46,801.00) e-ID : 22666
|
BDRIDP
|
bakerganj
|
506073023
|
|
|
|
45.67
|
M/S Khondokear Brothers
|
35.24
|
|
28/07/2015
|
27/04/2016
|
75
|
|
|
08/04/2019
|
|
66
|
BDRIDP/BAR/BAK/CCA-Rd/03
|
Improvement of Dudhalmou Ferryghat(RHD) to Kanki Govt.Pry.School Road by Earth Work and HBB under Bakergonj Upazila, District -Barisal.
|
BDRIDP
|
bakerganj
|
506074120
|
|
|
|
176.42
|
Md. Sumsudhoa Mollick
|
161.39
|
|
28/12/2016
|
27/06/2017
|
100
|
|
|
08/04/2019
|
|
67
|
BDRIDP/BAR/BAK/CCA-Rd/04
|
Improvement of road from west Faridpur Ajgor Sikder Bari to DC road Ferry-ghat via H/O Rahim Mrida Road, a Earth Work from Ch. 0.0 - 1300.00m. b Bituminus Carpeting from Ch. 0.0 - 1300m c Construction of 1 No. 4.0m x 4.0m RCC Box Culvert at Ch. 425m. unde
|
BDRIDP
|
bakerganj
|
506074151
|
1.30
|
|
|
99.94
|
M/S Islam Brothers
|
89.95
|
|
|
|
100
|
|
|
08/04/2019
|
|
68
|
BDRIDP/BAR/BAK/CCA-Rd(R)/05
|
Improvement of road from ATIMKHANA to Bothra Road via Mr. Matiur Rahman (ASP) at Ch. 0.00m-500.00m (Efective Length= 475.00m) (ID No.506074225) under Bakergonj Upazila, Dist : Barisal [Salvaged cost : Tk1049647.00]
|
BDRIDP
|
bakerganj
|
|
0.50
|
|
|
33.05
|
M/S Osin Enterprise
|
29.74
|
|
24/01/2018
|
24/05/2018
|
100
|
|
|
08/04/2019
|
|
69
|
BDRIDP/BAR/BAK/CCA-Rd/07
|
Improvement of road from Sampur Ray Barir Culvert to Birangal Digirpar Kader Hohlade Bari via Karim Gaji Bari a Earth work 0.0 - 1500m b Bituminous Surfacing - wearing course DC 0.0m - 1500m c 1.5 m x 1.5m RCC Box Culvert at Ch.900m
|
BDRIDP
|
bakerganj
|
506075125
|
1.50
|
|
|
91.26
|
M/S Abul Kalam Azad
|
82.13
|
|
29/01/2018
|
29/10/2018
|
60
|
|
|
08/04/2019
|
|
70
|
BDRIDP/BAR/BAK/CCA-Rd/09
|
Improvement of Aulia DargabariRHD to Shyampur Hat via Dhokati Madrasha & Dhokati Govt.Pry.school Auliapur Dargabari RHD-Sampur Road Howlader Bari Trimohini to Syampur Hat via Ali Khan Bari a Earth work at Ch.4500-6000m b Carpeting BC at Ch.4500 - 6000m c
|
BDRIDP
|
bakerganj
|
506074119
|
1.50
|
|
|
147.92
|
Md. Nasir Uddin
|
137.43
|
|
|
|
100
|
|
|
08/04/2019
|
|
71
|
BDRIDP/BAR/BAK/UZ-Rd/01
|
Improvement of Rahamgonj RHD via Dhokati GPS & Bakergonj-Sampur Road to BoaliaGC Bakergonj-Sampur Road Mill Ghar to Auliapur Dargabari RHD-Sampur Road Howlader Bari Trimohini a Earth work at Ch.1913-2775mb CarpetingBC at Ch.1913-2775mc Construction of 1No
|
BDRIDP
|
bakerganj
|
506072014
|
0.86
|
|
|
85.83
|
M/s Kazi Holdings
|
79.95
|
|
|
|
90
|
|
|
08/04/2019
|
|
72
|
BDRIDP/BAR/BAK/Gha/01
|
Construction of Ghatla at Kaligonj Bazar Khal under Bakergonj Upazila Barisal .
|
BDRIDP
|
bakerganj
|
|
|
|
|
19.33
|
M/S S H Enterprise
|
18.85
|
|
|
|
40
|
|
|
08/04/2019
|
|
73
|
BDRIDP/BAR/BAK/CCA-RdR/10
|
Improvement of Road from Hanua UP Office Bridge to Sarder Bari Foot Bridge via Jainpuri Khanka Sarif Bari & Khodaboxkati Eshak Member Bari Char a Earth work at Ch.0.0 - 2000m b CarpettingBC Ch.0.0 -2000m c Construction of 1 No Box culvert 1.0m x 1.0m at ch.1310m d Protective worksPalisading 60m under Bakergonj UpazilaBarishal District. Salvaged Cost TK.1943192.00
|
BDRIDP
|
bakerganj
|
506074199
|
2.00
|
1.00
|
|
14520624.67
|
M/S Sikder Enterprise
|
0.00
|
|
|
|
15
|
|
|
08/04/2019
|
|
74
|
BDRIDP/BAR/BAK/UN-EW/01
|
Improvement of road from Kalaskati UP Office (Vumi Office) to Arshed Khaya Ghat via Kumarbari Bridge & Bagdia Govt. Pry. Schoo. Road by Earth Filling Work at Ch. 00m-4870m.
|
BDRIDP
|
bakerganj
|
506073023
|
4.87
|
|
|
2228745.00
|
|
0.00
|
16/04/2015
|
|
|
100
|
|
|
08/04/2019
|
|
75
|
BDRIDP/BAR/BAK/UZ-St/01
|
Construction of 23.00m Long RCC Girder Bridge over road from Kamarkali GC to Baharchar GC via Sarsi Pollice Farry Patkati L/G Faridpur UP Office & Janota Bajarat at Ch. 5847m Under Bakerganj Upazila District Barisal Road ID 506072012
|
BDRIDP
|
bakerganj
|
506072012
|
|
23.00
|
|
13048406.72
|
M/S SUN TRADERS
|
12395986.38
|
23/08/2018
|
23/08/2018
|
04/08/2019
|
80
|
|
|
08/04/2019
|
|
76
|
BDRIDP/BAR/BAK/CCA-Rd/11
|
Improvement of Road from Goma Amtala to Chatra Hat via Gajir Hat DKP High School & Sowdakar Bari Road by BC at Ch. 1600m-2100. Effective Length 500m.Under Bakerganj Upazila District- Barishal.
|
BDRIDP
|
bakerganj
|
506074136
|
0.50
|
|
|
3243472.30
|
|
0.00
|
|
|
|
0
|
|
|
08/04/2019
|
|
77
|
BDRIDP/BAR/BAK/CCA-Rd/12
|
Improvement of road from Kabiraj Altaf Chairman Bari near Madrasha to East Dhudal Community Pry School via Shahajahan Howlader & Alomgir Mollik Bari road by BC Ch. 736m-2000m. Under Bakerganj Upazila District- Barishal.
|
BDRIDP
|
bakerganj
|
506074148
|
1.26
|
|
|
8566686.78
|
|
0.00
|
|
|
|
0
|
|
|
08/04/2019
|
|
78
|
BDRIDP/BAR/BAK/CCA-Rd/13
|
Improvement of Road from Kabai Dhola Riazuddin Madrasha to Khodaboxkati Govt. Pry. School by BC work at Ch.00m-500 with 1 No. 900mx900m U-Drain. Under Bakerganj Upazila District- Barishal.
|
BDRIDP
|
bakerganj
|
506075432
|
0.50
|
0.90
|
|
3857006.71
|
|
0.00
|
|
|
|
0
|
|
|
08/04/2019
|
|
79
|
BDRIDP/BAR/BAK/CCA-Rd/14
|
A Improvement of road from Rabipur Ali Hossain Khan Bari UZR to Sharif Bari via Ayeb Boyati Bari i Earthwork Ch.0.0m-500m ii CarpetingDC Ch.0.0 - 500m.iii Palisading work-50m B Improvement of road from S/Side of Kabai HatNear Chunakhali Sluice Get to E/S of Pearpur Iron BridgeUZR via Chunakhali HatDhola Madrasa & Dhola Sluice Get i Earthwork Ch.4000m-5000m ii Carpeting DC Ch.4000m-5000m iii Construction of 2Nos 1.0m x 1.0m Box Culvert at Ch.4666m 4951m & 1No. U-Drain at Ch.4830m iv Palisading work-55m Under Bakergonj Upazila Barishal District
|
BDRIDP
|
bakerganj
|
"506075099 506074155"
|
2.00
|
3.00
|
|
11940345.81
|
|
0.00
|
|
|
|
0
|
|
|
08/04/2019
|
|
80
|
BDRIDP/BAR/BAK/CCA-Rd/15
|
Improvement of road East Bathsala UZR to Dhulia River Bank via Bathsala Karikornagar GPS infront of Amir Khan Bari Mosque Salvaged Cost Tk 331586.00 i Earthwark Ch.0.00m-1450m. ii Carpeting DC Ch.0.00m-1450m. iii Construction of 01 No U-Drain 0.9mx0.9m at Ch.1250m.iv Palasading 79m. Under Bakergonj Upazila Barishal District.
|
BDRIDP
|
bakerganj
|
506075379
|
1.45
|
0.90
|
|
10466500.00
|
|
0.00
|
|
|
|
0
|
|
|
08/04/2019
|
|
81
|
BDRIDP/BAR/BAK/CCA-Rd/16
|
Part A Improvement of road from H/O Sujauddin Halta F.H. high School. Halta Mouza Sholoshath to Surath Memorial GPS. i Earthwark Ch.0.00m-850m. ii Carpeting DC Ch.0.00m-850m. iii Construction of 02 Nos RCC Culvert1.6mx1.6m at Ch 4m845m 3 Nos U-Drain 0.9mx0.9m at Ch.120m190m235m.iv Palsading 96mPart B Improvement of road from Mokimabad Bajar S/Side of Culvert to East Side of BIP Siuce Get via Dilip Master Bari.Oza Bari to Thakur Bari via Naboraz Biswas bari i Earthwark Ch.2500m-3250m. ii Carpeting DC Ch. 2500m-3250m. iii Construction of 01 No RCC Culvert 1.6mx1.6m at Ch 3125m.iv Palsading 38m.Under Bakergonj Upazila District Barishal.
|
BDRIDP
|
bakerganj
|
"506075180 506075229"
|
0.75
|
1.60
|
|
14776000.00
|
|
0.00
|
|
|
|
0
|
|
|
08/04/2019
|
|
82
|
BDRIDP/BAR/BAK/CCA-Rd/17
|
Part A Improvement of road from Padrishibpur GPSUZR to Bismillah Bazar via Sikder Bari Kowabunia khal & Dhulal sadu Bari Salvaged Cost Tk 921459.76i Earthwark Ch.0.0m-900m. ii Carpeting DC Ch. 0.0 - 900m. iii Construction of 01 No 2.0 m x 2.0m RCC Box Culvert & 1No.U-Drain at Ch 482m.& 28m iv Palsading 59m.Under Bakergonj Upazila District Barishal. Part B Improvement of road from East side of Bangla bazar Box Culvert to Wapder Khal Ghorar Bridge Bothra via Biharipur Madrasha road. i Earthwark Ch.3250m-3850m. ii Carpeting DC Ch.3250m-3850m. iii Construction of 01 No 2.0 m x 2.0m RCC Box Culvert at Ch.3255m & 01 No 1.6 m x 1.6m RCC Box Culvert at Ch.3716m iv Palsading 28m.Under Bakergonj Upazila District Barishal.Part C Improvement of road from Padrishibpur Sunddartala Baily Bridge UZR to Aowal Sikderbari i Earthwark Ch.0.0m-500m. ii Carpeting DC Ch. 0.0 - 500m. Under Bakergonj Upazila District Barishal.
|
BDRIDP
|
bakerganj
|
"506074057 506074182 506075155"
|
1.90
|
|
|
16443000.00
|
|
0.00
|
|
|
|
0
|
|
|
08/04/2019
|
|
83
|
BDRIDP/ BAR/BAK/ CCA-Rd/18
|
Improvement of Road UZR Rabipur GPS UNR Younous Sharif Bari Via Rabipur. Salvaged Cost Tk 641271.00i Earthwark Ch.0.00m-500m. ii Carpeting DC Ch.0.00m-500m. iii Palsading 50m. Under Bakergonj Upazila Barishal District.
|
BDRIDP
|
bakerganj
|
506074267
|
|
|
|
3691293.00
|
|
0.00
|
|
|
|
0
|
|
|
08/04/2019
|
|
84
|
BDRIDP/BAR/BAK/UN-St/01
|
Construction of RCC Box Culvert over road from Kaloskati UP Office (Vumi Office) to Arshed Khayaghat via Kumarbari Bridge & Bagdia GPS with 7 Nos. 1.60mx1.60m at Ch. 850m, 1110m, 1456m, 1608m, 2507m, 3520m, 4245m & 2 Nos. 2vent 4.00mx4.00m at Ch. 1242m &
|
BDRIDP
|
bakerganj
|
|
|
|
|
73.40
|
M/S Khondokear Brothers
|
53.45
|
|
21/06/2015
|
20/06/2016
|
100
|
|
|
|
|
85
|
BDRIDP/BAR/BAK/UN-Rd(R)/02
|
Improvement of road from Kalaskati UP Office (Vumi Office) to Arshed Khayaghat via Kumarbari Bridge & Bagdia GPS road By BC from Ch. 1000m-4870m. e-ID : 22667
|
BDRIDP
|
bakerganj
|
|
|
|
|
180.93
|
M/S Khondokear Brothers
|
146.83
|
|
|
|
100
|
|
|
|
|
86
|
BDRIDP/BAR/BAK/CCA-Rd(R)/02
|
Rehabilitation of road from Gavikola Mannan Sikder Bari Foot Bridge to West side of Nilganj Foot Bridge via Moksad Khan,Kumarghudi & Kaptain Saye Bari by BC from Ch.00-810m [Salvaged Value Tk.10,53,654.00] e-ID : 29366
|
BDRIDP
|
bakerganj
|
|
0.81
|
|
|
35.54
|
Md. Nasir Uddin
|
26.20
|
|
|
|
100
|
|
|
|
|
87
|
BDRIDP/BAR/BAK/UN-Rd/03
|
Improvement of road from Faridpur Hat Kheya Ghat Durgapasa UP office Gobindapur Bothtala via Kakordha Bazar Road, a Earth Work from Ch. 4860m 7320m.b Bituminus Carpeting from Ch. 4860m 7470m.c Construction of 1 No. 1.60mx1.60m RCC Box Culvert at Ch. 7435
|
BDRIDP
|
bakerganj
|
|
2.46
|
|
|
164.60
|
Md Mafuz Khan
|
148.14
|
|
|
30/11/2018
|
100
|
|
|
|
|
88
|
BDRIDP/BAR/BAK/CCA-Rd/06
|
Improvement of road from Shashi Bazar Bridge-Telani Lunch Ghat Najrul Talukder Bari. under Bakergonj Upazila Dist:Barisal. a) HBB from Ch. 00m-1000m b) Protection Work 108m c) Earth work from Ch. 00m-1000m
|
BDRIDP
|
bakerganj
|
|
1.00
|
|
|
46.09
|
Md. Zakir Hossain Mia
|
45.63
|
|
24/01/2018
|
24/07/2018
|
100
|
|
|
|
|
89
|
BDRIDP/BAR/BAK/CCA-Rd/08
|
Improvement of Extended Portion of Dudhalmou Ferryghat (RHD) to Kanki Govt. Pry. School Road (Connecting Road Sheikh Hasina Cantonment).
|
BDRIDP
|
bakerganj
|
|
|
|
|
43.33
|
M/S Amir Engineering Corporation
|
28.78
|
|
20/01/2018
|
15/02/2018
|
100
|
|
|
|
|
90
|
BDRIDP/BAR/BAN/UZ-Rd/01
|
Improvement of road from Banaripara - Harta, At Ch.5865 -6865m under Banaripara Upazila, District Barisal.
|
BDRIDP
|
banaripara
|
|
1.00
|
|
|
70.14
|
M/S Saleha Enterprise
|
53.50
|
|
|
|
50
|
|
|
08/04/2019
|
|
91
|
BDRIDP/BAR/BAN/UZ-St/01
|
Construction of 1No.2.0m x 2.0m ,1 No.3.0m x 3.0m , 2Nos.4.0m x 4.0m , 1No.1.0m x 1.0m RCC Box Culvert & 3 Nos 0.625m x 0.625m U-Drain at Ch.5950m, 6787m, 6145m, 6230m, 6407m, 5871m, 6555m & 6622m on Banaripara-Harta Road.
|
BDRIDP
|
banaripara
|
|
|
|
|
75.32
|
M/S Soma Enterprise
|
54.62
|
|
|
|
100
|
|
|
08/04/2019
|
|
92
|
BDRIDP/BAR/BAN/UZ-St/02
|
Construction of 15.00m RCC Girder Bridge on Banaripara to Harta road at ch.8642km over B.Bari Khal under Banaripara UpazilaBarisal District
|
BDRIDP
|
banaripara
|
|
|
|
|
118.50
|
Md Mahfuz Khan
|
106.65
|
|
|
|
90
|
|
|
08/04/2019
|
|
93
|
BDRIDP/BAR/BAN/UZ-St/03
|
Construction of 15.00m RCC Girder Bridge on Banaripara to Harta road at ch.7162 km over Onil Ghat Khal under Banaripara UpazilaBarisal District
|
BDRIDP
|
banaripara
|
|
|
|
|
98.14
|
Md Mahfuz Khan
|
88.33
|
|
|
|
70
|
|
|
08/04/2019
|
|
94
|
BDRIDP/BAR/BAN/Gha/01
|
Construction of RCC Ghat at Mohish Katakhali Kheya Ghat under Banaripara Upazila Barisal .
|
BDRIDP
|
banaripara
|
|
|
|
|
29.12
|
M/S Amir Engineering Corporation
|
26.21
|
|
|
|
20
|
|
|
08/04/2019
|
|
95
|
BDRIDP/BAR/BAN/UZ-EW/01
|
Resectioning of Banaripara-Harta Road at Ch. 4665m-6066m.
|
BDRIDP
|
banaripara
|
|
1.40
|
|
|
4.42
|
Zakir HossainLCS No: 1
|
4.42
|
|
|
30/03/2017
|
100
|
|
|
08/04/2019
|
|
96
|
BDRIDP/ BAR/BAN/ CCA-Rd/01
|
Improvement of road by BC Gordder Abu Taher Shop to Kachua Madrasha. Salvaged Cost Tk 448135.00i Earthwark Ch.600m-1600m. ii Carpeting DC Ch.600m-1600m. iii Construction of 03 Nos. 1.5mx1.5m Box Culvert at Ch.667m742m & 938m & U-Drain 0.6mx0.6m at Ch.870m973m & 1550m. under Banaripara UpazilaBarishal District
|
BDRIDP
|
banaripara
|
506105098
|
|
|
|
8974998.00
|
|
0.00
|
|
|
|
0
|
|
|
08/04/2019
|
|
97
|
BDRIDP/BAR/SDR/CCA-Rd(R)/05
|
Rehabilitation of road from Jaliabari Pool via Mujaffar Hazi Bari road by BC from Ch. 0.00m-2782m.
|
BDRIDP
|
barishal-s
|
506514048
|
2.78
|
|
|
109.10
|
M/S Hasan Construction
|
87.73
|
|
17/05/2015
|
17/02/2016
|
100
|
|
|
08/04/2019
|
|
98
|
BDRIDP/BAR/SDR/UZ-Rd/01
|
Improvement of Shehaber Hat Singherkati Chandramohon road from Ch. 729m - 1308m.under Sadar Upazila Barisal.
|
BDRIDP
|
barishal-s
|
506512003
|
0.58
|
|
|
42.10
|
M/S Niaz Traders
|
37.89
|
|
|
|
70
|
|
|
08/04/2019
|
|
99
|
BDRIDP/BAR/SDR/CCA-Rd(R)/11
|
Improvement of road from Charmonai Talukder Bari-West Razarchar Club by BC. at Ch. 0.00m-1203.00m under Charmonai Union, Upazila : Sadar, Dist-Barisal [Salvaged cost- Tk 231155.00]
|
BDRIDP
|
barishal-s
|
506515109
|
1.20
|
|
|
87.69
|
M/S Kohinoor Enterprise
|
78.92
|
|
25/01/2018
|
25/11/2018
|
40
|
|
|
08/04/2019
|
|
100
|
BDRIDP/BAR/SDR/Gha/01
|
Construction of Ghat & CC Road at Shaheber Bazar under Sadar Upazila Barisal .
|
BDRIDP
|
barishal-s
|
|
|
|
|
32.79
|
M/S S H Enterprise
|
31.03
|
05/05/2018
|
12/05/2018
|
12/11/2018
|
20
|
|
|
08/04/2019
|
|
101
|
BDRIDP/BAR/SDR/CCA-Rd/13
|
Improvement of Shibpasha Sarder bari Sholna Tarunclub Road Road Part-A Earth work at Ch. 0.00 -1505.00m Part-B Carpeting BC work at Ch. 0.00-1505.00m Salvage Amount Tk. 2626839.00 Part-C Construction of 2Nos U-Drain 1.00mx1.00m at Ch. 140m & 380m Under B
|
BDRIDP
|
barishal-s
|
506514007
|
1.51
|
|
|
106.04
|
M/S Noor & Sons
|
100.74
|
|
18/06/2018
|
18/05/2019
|
35
|
|
|
08/04/2019
|
|
102
|
BDRIDP/BAR/SDR/CCA-RdR/14
|
Improvement of Shibpasha Sarder bari-Sholna Tarunclub road a Earth work at Ch.1505-2392m b Carpetting BC Ch.1505 -2392m c Construction of 1 No Double vent Box culvert 4.0m x 4.0m at ch.1901m d Protective worksPalisading 134m e Link Road Baitul Mamur Jame
|
BDRIDP
|
barishal-s
|
|
0.82
|
|
|
101.12
|
|
0.00
|
|
|
|
0
|
|
|
08/04/2019
|
|
103
|
BDRIDP/BAR/SDR/CCA-EW/04
|
Resectioning of Road from Shaheber Hat to Bairagibari via Gourchandar Bridge (Bisharad GPS cum CS) at Ch. 2557m-3280m.
|
BDRIDP
|
barishal-s
|
|
4.09
|
|
|
7.52
|
Md. Hemayet HowladerLCS No-1Md. Mojibor Rohman SikderLCS No-2Mosharof Hossain ShikderLCS No-3
|
7.52
|
|
28/03/2017
|
30/04/2017
|
70
|
|
|
08/04/2019
|
|
104
|
BDRIDP/BAR/SDW/UZ-Ew/01
|
Resectioning of Shehaber Hat-Singherkati Chandramohon Road at Ch. 1009m-1309m
|
BDRIDP
|
barishal-s
|
506512003
|
12.09
|
|
|
3.56
|
LCS No-2
|
3.56
|
|
|
|
100
|
|
|
08/04/2019
|
|
105
|
BDRIDP/BAR/SDR/CCA-Rd/10
|
Improvement of Road from Shaheber Hat to Bairagibari Via Gourchandra Bridge (Bisharad GPS cum CS) from Ch.5103 - 6647m including 1 No.1.0m x1.0m U-Drain & 1No.3.m x 3.0m RCC Box Culvert at Ch.5479m & 6141m under Sadar Upazila,Barisal.
|
BDRIDP
|
barishal-s
|
506514137
|
1.54
|
4.00
|
|
9500469.00
|
M/S Sirajul Alam Sikder
|
8550422.10
|
22/05/2017
|
29/05/2017
|
08/04/2019
|
65
|
|
|
08/04/2019
|
|
106
|
BDRIDP/BAR/SDR/UN-Rd/01
|
a .Improvement of road from Gilatali Kheyaghat - Biswasher hat via Model Madrasha. from Ch.1500 - 4260m under Sadar UpazilaDistrict-Barisal. b. Construction of 3 Nos 1.6m x 1.6m RCC Box culvert at ch.2568m 3530m & 4033m and 1No.4m x4m RCC Box Culvert at ch.3640m on the same road.
|
BDRIDP
|
barishal-s
|
506513003
|
2.76
|
5.00
|
|
18760504.00
|
Md Mafuz Khan
|
16884454.00
|
18/01/2018
|
18/01/2018
|
30/11/2019
|
20
|
|
|
08/04/2019
|
|
107
|
BDRIDP/BAR/SDR/CCA-Rd/04
|
Improvement of road from Chownatha Toabu Chowkider Bari via Clinic road by BC from Ch. 0.00m-1000m with 1 No 1.60m×1.60m Box Culvert at Ch. 366m.
|
BDRIDP
|
barishal-s
|
506514059
|
1.00
|
|
|
45.44
|
M/S Lutful Kabir
|
40.37
|
|
|
|
100
|
|
|
15/04/2015
|
|
108
|
BDRIDP/BAR/SDR/UN-St/01
|
Construction of 20.00m Long RCC Girder Bridge on Nishatala Tunglbaria UP office-Shaheberhat via Bisharad road at Ch. 136m.
|
BDRIDP
|
barishal-s
|
506513002
|
0.02
|
20.00
|
0
|
127.73
|
M/S Rupali Construction
|
100.88
|
11/03/2015
|
17/03/2015
|
17/03/2016
|
100
|
|
0
|
15/04/2015
|
|
109
|
BDRIDP/BAR/SDR/CCA-EW/01
|
Rehabiliation of road from of Narokati Altaf Mollah Bari-Moslem Howlader Dokan via GPS (Narokati GPS) road by BC from Ch. 0.00m-732m.
|
BDRIDP
|
barishal-s
|
506514059
|
0.73
|
|
30
|
2.38
|
Md. Giush Uddin
LCS No-1
|
2.38
|
29/01/2015
|
15/02/2015
|
30/04/2015
|
100
|
0.71
|
30
|
15/04/2015
|
|
110
|
BDRIDP/BAR/SDR/CCA-Rd/01
|
Improvement of Bukhainagar Bridge to Abdul Aziz Khan's House via Shaluka GPS Road (Ch. 00-500m).
|
BDRIDP
|
barishal-s
|
506514170
|
0.50
|
|
0
|
20.46
|
M/S Talukder Enterprise
|
16.13
|
09/06/2014
|
16/06/2014
|
16/09/2014
|
100
|
0.00
|
0
|
31/03/2015
|
|
111
|
BDRIDP/BAR/SDR/CCA-Rd/02
|
Improvement of Chandpura Mojidderhat-Saheberhat via Khontakhali School road from Ch. 1635-3192m.
|
BDRIDP
|
barishal-s
|
506514154
|
1.56
|
|
0
|
74.67
|
M/S G M Construction
|
62.80
|
10/08/2014
|
17/08/2014
|
16/05/2015
|
100
|
0.00
|
0
|
31/03/2015
|
|
112
|
BDRIDP/BAR/SDR/CCA-Rd/03
|
Improvement of Road form Karnakathi Puraton Hat-Char Aicha Sabuz Memerer Bari By BC Ch. 0.00-513m
|
BDRIDP
|
barishal-s
|
506514148
|
0.51
|
|
0
|
28.10
|
M/S Serajul Islam Hanif
|
22.94
|
24/07/2014
|
|
|
100
|
0.00
|
0
|
31/03/2015
|
|
113
|
BDRIDP/BAR/SDR/CCA-St/04
|
Construction of 4 Nos 2.00×1.60m Box Culvert on Jaliabari Pool via Mujaffar Hazi Bari road at Ch. 391m, 910m, 1740, & 1860m.
|
BDRIDP
|
barishal-s
|
|
|
|
|
13.34
|
M/S Khondokar Borthers
|
10.27
|
|
28/07/2015
|
27/01/2016
|
100
|
|
|
|
|
114
|
BDRIDP/BAR/SDR/CCA-St/02
|
Construction of 1.0 x 1.0m and 1.6 x1.6m RCC Box culvert on Kasem Defader Bari - Karnokati High School & College road at ch.773m & 526m e-ID: 17457
|
BDRIDP
|
barishal-s
|
|
|
|
|
5.16
|
M/S Khondokar Borthers
|
4.28
|
|
23/06/2015
|
22/12/2015
|
100
|
|
|
|
|
115
|
BDRIDP/BAR/SDR/CCA-Rd(R)/06
|
Rehabilitation of road from Kasem Defader Bari - Karnokati High School & College road By BC from ch.310 - 1125m under Sadar upazila ,Barisal District [Salvaged Cost-Tk 4,97,038.00]
|
BDRIDP
|
barishal-s
|
|
0.82
|
|
|
33.86
|
M/S Oshin Enterprise
|
31.16
|
|
18/05/2015
|
18/02/2016
|
100
|
|
|
|
|
116
|
BDRIDP/BAR/SDR/CCA-Rd/07
|
Improvement of road from Charkawa Nayani - Shaberhat via Durgapur hat (Barisal Sadar Upazila 7no. Charkawa union 1no.word nurul islam to Bank Jalal Bari Pull) road By HBB from Ch.0.0 - 1000m under Barisal-S Upazila,Barisal District. e-ID : 29367
|
BDRIDP
|
barishal-s
|
|
1.00
|
|
|
24.31
|
M/S Apu Enterprise
|
20.63
|
|
|
|
100
|
|
|
|
|
117
|
BDRIDP/BAR/SDR/CCA-Rd/09
|
(a) Improvement of road Shibpasha-Sholna Talukder Bari via Malek Police Bari at Ch. 0.00m-1600m (Sholna DC Road-Tulatola-Badantola with link road Tulatola-Ghorami Bari Bridge) (b) Construction of 1.60m×1.60m Box Culvert and U-Type Culvert at Ch. 694m & 13
|
BDRIDP
|
barishal-s
|
|
1.60
|
|
|
125.90
|
M/S Khondokear Enterprise
|
108.02
|
|
30/06/2016
|
26/06/2017
|
100
|
|
|
|
|
118
|
BDRIDP/BAR/SDR/UN-Rd/02
|
Improvement of Charkawa Kheyaghat - Durgapur hat road from Ch. 3000m - 3600m.under Sadar Upazila Barisal District.
|
BDRIDP
|
barishal-s
|
|
0.60
|
|
|
34.65
|
M/S Niaz Traders
|
31.18
|
|
|
|
60
|
|
|
|
|
119
|
BDRIDP/BAR/SDR/CCA-RdR/12
|
Improvement of road Shibpasha - Sholna Talukder bari via H/O Malek Police at ch.1600km - 2020km under Sadar Upazila Barisal.
|
BDRIDP
|
barishal-s
|
|
0.42
|
|
|
27.20
|
M/S Kohinoor Enterprise
|
24.48
|
|
|
|
100
|
|
|
|
|
120
|
BDRIDP/BAR/SDR/CCA-EW/02
|
Resectioning of road from Charkawa Nayami-Shaheber hat via Durgapur hat (Barisal Sadar Upzila 7no. Charkawa union 1no word nurul islam to Bank Jalal Bari Pull) road from Ch. 0.00m-1000m.
|
BDRIDP
|
barishal-s
|
|
|
|
|
1.55
|
Md. Anowar Hossain Mridha
LCS No-1
|
1.55
|
|
16/04/2015
|
16/05/2015
|
100
|
|
|
|
|
121
|
BDRIDP/BAR/SDR/CCA-EW/03
|
Resectioning of road Shibpasha-Sholna Talukder Bari via Malek Police Bari at Ch. 0.00m-1600m (Sholna DC Road-Tulatola-Badantola with link road Tulatola-Ghorami Bari Bridge).
|
BDRIDP
|
barishal-s
|
|
1.60
|
|
|
4.00
|
Fatema Begum
LCS No-1
|
4.00
|
|
29/02/2016
|
30/04/2016
|
100
|
|
|
|
|
122
|
BDRIDP/BAR/SDR/UN-EW/01
|
Resectioning of Road from Gilatali Kheyaghat-Biswasherhat via Model Madrasha at Ch. 1500m-2700m
|
BDRIDP
|
barishal-s
|
|
1.20
|
|
|
4.38
|
LCS No-1
|
4.38
|
|
|
|
100
|
|
|
|
|
123
|
BDRIDP/BAR/SDW/UZ-Ew/01
|
Resectioning of Shehaber Hat-Singherkati Chandramohon Road at Ch. 729m-1009m
|
BDRIDP
|
barishal-s
|
|
0.28
|
|
|
2.55
|
LCS No-1
|
2.55
|
|
|
|
100
|
|
|
|
|
124
|
BDRIDP/BAR/GOR/UZ-ST/01
|
Construction of 30.00m PSC Girder Bridge on Barti Bazar to Gournadi GC at Ch.5000km over Anandhapur Khal under Gournadi UpazilaDistrict-Barisal
|
BDRIDP
|
gouranadi
|
506322005
|
|
30.00
|
|
249.34
|
M/S Kohinoor Enterprise
|
271.73
|
|
18/03/2018
|
18/03/2019
|
75
|
|
|
08/04/2019
|
|
125
|
BDRIDP/BAR/GOR/UZ-ST/02
|
Construction of 32.00m PSC Girder Bridge on Barti BazarNHW to Gournadi GC via Torky GC at Ch.9340km over Kashba Khal under Gournadi Upazila District-Barisal
|
BDRIDP
|
gouranadi
|
506322005
|
|
32.00
|
|
241.97
|
M/S Kohinoor Enterprise
|
263.70
|
|
18/03/2018
|
18/03/2019
|
65
|
|
|
08/04/2019
|
|
126
|
BDRIDP/BAR/GOR/UZ-RdR/05
|
Periodic Maintenance of Batazore-Agarpur-Sarikal via Hosnabad Nalchira-Miarchar road. a Earthwark from Ch. 8725- 17177m.b Carpeting DC 17361.14 sqm.c 12mm SC-13906.56 sqm. Under Gournadi Upazila District - Barishal.
|
BDRIDP
|
gouranadi
|
506322002
|
|
|
|
16020946.00
|
|
0.00
|
|
|
|
0
|
|
|
08/04/2019
|
|
127
|
BDRIDP/BAR/GOR/UZ-RdR/06
|
Periodic Maintenance of iIlah Bas stand NHW to Agailjhara H/Q via Bakai & Rajihar Bazar in/c Nutun Bazar Connecting road.a Earthwark from Ch. 0- 3832m.b Carpeting DC 3224.409 sqm.c 12mm SC-11191.1 sqm. Under Gournadi Upazila District - Barishal.
|
BDRIDP
|
gouranadi
|
506322006
|
|
|
|
5915176.00
|
|
0.00
|
|
|
|
0
|
|
|
08/04/2019
|
|
128
|
BDRIDP/BAR/GOR/UZ-RdR/07
|
Periodic Maintenance of Batazore GCNHW to Dhamura GC via Solak Bazar road.a Earthwark from Ch. 0- 2145m.b Carpeting 40mm-DC 6403.2 sqm.c Palisading Work297.00m. Under Gournadi Upazila District - Barishal.
|
BDRIDP
|
gouranadi
|
506322011
|
|
|
|
8824294.00
|
|
0.00
|
|
|
|
0
|
|
|
08/04/2019
|
|
129
|
BDRIDP/BAR/GOR/UN-RdR/05
|
Periodic Maintenance of Chadshi UP Office-Goila UP Office Road.a Earthwark from Ch. 0- 830m.b Carpeting DC 322.5 sqm.c 12mm SC-2208.35 sqm. Under Gournadi Upazila District - Barishal.
|
BDRIDP
|
gouranadi
|
506323020
|
|
|
|
1001243.00
|
|
0.00
|
|
|
|
0
|
|
|
08/04/2019
|
|
130
|
BDRIDP/BAR/GOR/CCA-Rd/02
|
Improvement of road from Gournadi Highway Thana Connecting road under Gournadi Upazila.
|
BDRIDP
|
gouranadi
|
|
|
|
|
15.44
|
M/S Tamim Enterprise
|
16.12
|
|
21/06/2015
|
20/11/2015
|
100
|
|
|
|
|
131
|
BDRIDP/BAR /GOU/UN-Rd/01
|
(a) Improvement of Road from Sarikal GC to Shaheber char Bazar via Nalchira Bazar ch. 5555m-7055m), (b) Construction of 2 nos U-drain at ch.599m & 6555m on the same road Under Gournadi Upazila, District-Barisal.
|
BDRIDP
|
gouranadi
|
|
1.50
|
|
|
97.85
|
M/S Islam Brothers
|
103.58
|
|
23/11/2014
|
23/05/2015
|
100
|
|
|
|
|
132
|
BDRIDP/BAR /GOU/UZ-Rd/01
|
(a) Improvement of Road from Gournadi Bandar GC to Muladi GC via Kutubpur Bazar at ch. 0m-630m), (b) Construction of 2 nos U-drain at ch. 205m & 364m on the same road Under Gournadi Upazila, District-Barisal.
|
BDRIDP
|
gouranadi
|
|
0.63
|
|
|
51.23
|
M/S Islam Brothers
|
53.99
|
|
23/11/2014
|
23/05/2015
|
100
|
|
|
|
|
133
|
BDRIDP/BAR /GOU/UZ-Rd/02
|
Improvement of illah (NHW) to Kalkini Upazila HQ via Tulatala Bazar at ch.2413m-3213m), Under Gournadi Upazila, District-Barisal.
|
BDRIDP
|
gouranadi
|
|
0.80
|
|
|
46.43
|
M/S Sadman Builders
|
48.99
|
|
16/11/2014
|
15/05/2015
|
100
|
|
|
|
|
134
|
BDRIDP/BAR /GOU/UN-Rd/02
|
(a) Improvement of Batazore GC to Pinglakathi Bazar via Pachim Chandrahar GPS at ch. 0m-1000m), (b)Construction of 1 nos U-drain at at ch.14m on the same road, (c) Construction 1v-2.3mx2.30m RCC Box Culvert at ch.527m & 1583m on the same road Under Gourna
|
BDRIDP
|
gouranadi
|
|
1.00
|
|
|
78.05
|
M/S Islam Brothers
|
82.37
|
|
23/11/2014
|
23/05/2015
|
100
|
|
|
|
|
135
|
BDRIDP/BAR/GOR/CCA-Rd/01
|
Improvement of road from Maddam Hosnabad Nabarun RPS to Nezamuddin College by HBB at Ch.481-1492m (Nizamuddin Degree College road from freedom fighter Nizamuddin Shaheber Kaborstan via Madha hosnabad UP Member Md.Matiur Rahman Sarif Bari Bridge under Gour
|
BDRIDP
|
gouranadi
|
|
1.01
|
|
|
28.39
|
Md. Sirazul Islam Hanif
|
26.01
|
|
27/11/2014
|
27/04/2015
|
100
|
|
|
|
|
136
|
BDRIDP/BAR/GOR/UZ-Rd/03
|
Improvement of Barthi Bazar (NHW) to Gournadi GC via Torky GC at ch.2150 - 4150m.
|
BDRIDP
|
gouranadi
|
|
2.00
|
|
|
131.46
|
M/S Santu Traders
|
138.02
|
|
15/07/2015
|
14/07/2016
|
100
|
|
|
|
|
137
|
BDRIDP/BAR/GOR/UN-Rd/03
|
Rehabilitation of road from Mahilara UP Office to Chadshi Hat via Bilogram Bazar (A. Rob Chokder House to Chadshi Hat road) road By BC from Ch. 5370-6900m.
|
BDRIDP
|
gouranadi
|
|
1.53
|
|
|
58.34
|
M/S Santu Traders
|
61.25
|
|
15/07/2015
|
14/04/2016
|
100
|
|
|
|
|
138
|
BDRIDP/BAR/GOR/UN-Rd(R)/04
|
Rehabilitation of road from Mahilara UP office to Chadshi hat via Billogram Bazar road from Ch. 3740-4850m (Salvage Material Cost Tk. 11,01,418.00)
|
BDRIDP
|
gouranadi
|
|
1.11
|
|
|
53.59
|
M/S Santu Traders
|
56.24
|
|
15/07/2015
|
14/04/2016
|
100
|
|
|
|
|
139
|
BDRIDP/BAR/GOR/UN-St/01
|
Construction of 2-Vent 4.30mx4.30m RCC Box Culvert on Mahilara UP office to Chadshi hat via Billogram Bazar road at Ch. 4200m.
|
BDRIDP
|
gouranadi
|
|
|
|
|
19.71
|
M/S Santu Traders
|
20.69
|
|
15/07/2015
|
14/12/2015
|
100
|
|
|
|
|
140
|
BDRIDP/BAR/GOR/CCA-St/01
|
Construction of 3 Nos Single Vent 4.30mx4.30m RCC Box Culvert & 2 nos U-Drain on Battala Kapali bari Bridge (NHW) to Khanjapur High School road at ch. 95m,270m,1276m564m&970m Under Gournadi Upazila, District-Barisal e-ID : 22284
|
BDRIDP
|
gouranadi
|
|
|
|
|
66.81
|
M/S Siam Enterprise
|
69.47
|
|
|
|
100
|
|
|
|
|
141
|
BDRIDP/BAR/GOR/CCA-Rd/03
|
Improvement of road from Battala Kapali bari Bridge (NHW) to Khanjapur High School road by BC from Ch.00 - 1656m Under Gournadi Upazila, District-Barisal e-ID : 22285
|
BDRIDP
|
gouranadi
|
|
1.66
|
|
|
70.61
|
M/S Siam Enterprise
|
73.43
|
|
|
|
100
|
|
|
|
|
142
|
BDRIDP/BAR/GOR/UZ-Rd/04
|
Improvement of Barthi Bazar (NHW) to Burghata bus Stand (NHW) via Amanagong hat at Ch. 450-2450m. e-ID : 19611
|
BDRIDP
|
gouranadi
|
|
2.00
|
|
|
128.75
|
M/S Howlader Constructure
|
131.73
|
|
|
|
100
|
|
|
|
|
143
|
BDRIDP/BAR/GOR/UN-EW/01
|
Improvement of road from Mahilara UP Office to Chadshi hat via Billogram Bazar road By Earth Filling Work from Ch. 3740m-4850m.
|
BDRIDP
|
gouranadi
|
|
1.11
|
|
|
3.50
|
Anjur Ali Sarder
LCS No-1
|
3.50
|
|
15/11/2015
|
30/03/2016
|
100
|
|
|
|
|
144
|
BDRIDP/BAR/GOR/UZ-EW/01
|
Resectioning of road from Brthi Bazar (NHW) to Burghata Bus Stand (NHW) via Amanothgonj hat at Ch. 450m-2450m by earth.
|
BDRIDP
|
gouranadi
|
|
2.00
|
|
|
3.00
|
Md Mahabub Khan
LCS-1
|
3.00
|
|
|
|
100
|
|
|
|
|
145
|
|
|
BDRIDP
|
gouranadi
|
|
|
|
|
2.10
|
Md Mohasin Sharder
LCS-2
|
2.10
|
|
|
|
100
|
|
|
|
|
146
|
BDRIDP/BAR/HZL/CCA-Rd/01
|
Improvement of Kowria- Moulavirhat UZR Poschim koralia road under Hizla Upazila District Barisal aEarth work from Ch.0.0 -900m b Dense Carpeting Ch.0.0 -900m c Two vent 4m x 4m RCC Box Culvert at Ch.252m
|
BDRIDP
|
hizla
|
|
0.90
|
|
|
0.00
|
Md. Mahafuz Khan
|
79.51
|
|
|
|
35
|
|
|
08/04/2019
|
|
147
|
BDRIDP/BAR/HZL/CCA-Rd/02
|
Improvement of Hizla Muladi road to Motiar Dewan Bari via Sergent Dula Bari roadRHD via Surgeant Dulal- Kathal BeganUZR under Hizla Upazila Barisal District.ID No.506364003 Salvaged Cost Tk.2186650.00a Earth work Ch.0.0 - 1500mb Carpetting Ch. 0.0 - 1500m
|
BDRIDP
|
hizla
|
|
1.50
|
|
|
100.53
|
M/S R S Construction
|
95.51
|
|
28/06/2018
|
28/12/2018
|
25
|
|
|
08/04/2019
|
|
148
|
BDRIDP/BAR/HZL/Gha/01
|
Construction of RCC Boat land Station at Abupur Ghat under Hizla Upazila Barisal
|
BDRIDP
|
hizla
|
|
|
|
|
32.55
|
M/S S H Enterprise
|
31.47
|
|
|
|
100
|
|
|
08/04/2019
|
|
149
|
BDRIDP/BAR/HZL/CCA-Rd/03
|
Improvement of Khunna Hospital RHD via Kawmi Madrasha - Baherchar UZR Barajalia Board GPS CS Connecting road a Earthwork from Ch.850 -1820m b Carpetting BC from Ch.850 -1820m under Hizla Upazila District Barishal Salvaged Cost TK 2343371.00
|
BDRIDP
|
hizla
|
|
0.97
|
|
|
67.98
|
|
0.00
|
|
|
|
20
|
|
|
08/04/2019
|
|
150
|
BDRIDP/BAR/HZL/CCA-Rd/04
|
Improvement of road from Horinathpur Koshaipotti UZR - Zetighat GPS UZR ID No. a Earthwork from Ch.0.0 -1500m b Carpetting BC from Ch.0.0 -1500m under Hizla Upazila District Barishal Salvaged Cost TK 112128.00
|
BDRIDP
|
hizla
|
|
1.50
|
|
|
99.37
|
|
0.00
|
|
|
|
10
|
|
|
08/04/2019
|
|
151
|
BDRIDP/BAR/HZL/UZ-EW/01
|
Resectioning of road from Dhanusikder Hat to Muladi Upazila Road at Ch. 0.00m-325m
|
BDRIDP
|
hizla
|
|
0.33
|
|
|
2.27
|
Md. Humaun KabirLCS No-1
|
2.27
|
|
15/11/2015
|
30/03/2016
|
100
|
|
|
08/04/2019
|
|
152
|
BDRIDP/ BAR/HZL/ CCA-Rd/05
|
Improvement of road from UZR -6 Mohishkhola Madrasha to VRA-15 Uttor Guabaria GPS via house of Abdul Gafur Sarder road by BC From Ch. 00m-1760.00m. Salvage Amount TK 296023.00 Under Hizla Upazila District- Barishal.
|
BDRIDP
|
hizla
|
506364034
|
|
|
|
12738507.00
|
|
0.00
|
|
|
|
0
|
|
|
08/04/2019
|
|
153
|
BDRIDP/BAR/HZL/CCA-Rd/06
|
Improvement of Kawria Bazar Danushikder hat road - Noroshingpur road Start Mollah Bari Shop Salvaged Cost Tk.309333.54 i Earth work Ch.0.0 - 760miiCarpeting DC Ch.0.0 - 760m under Hizla Upazila District Barishal.
|
BDRIDP
|
hizla
|
506365051
|
|
|
|
1255934.00
|
|
0.00
|
|
|
|
0
|
|
|
08/04/2019
|
|
154
|
BDRIDP/BAR/HZL/UZ-St/01
|
Dhunusikder Hat to Memania Taker Hat road via Abupur Kheyaghat i Construction of Diuble vent 2 x 4.50 x 6.50m RCC Box Culvert at Ch.2600mii Construction of Diuble vent 2 x 4.00 x 5.00m RCC Box Culvert at Ch.3380mUnder Hizla Upazila Barishal District.
|
BDRIDP
|
hizla
|
506362005
|
|
|
|
5693472.00
|
|
0.00
|
|
|
|
0
|
|
|
08/04/2019
|
|
155
|
BDRIDP/ BAR/HZL/ CCA-Rd/07
|
Improvement of Purbo Kandi WDB Embt. Salvaged Cost Tk 257546.00i Earthwark Ch.0.00m-900m. ii Carpeting DC Ch.0.00m-900m. iii Palsading 95m.Under Hizla Upazila Barishal District.
|
BDRIDP
|
hizla
|
506365003
|
|
|
|
6755327.00
|
|
0.00
|
|
|
|
0
|
|
|
08/04/2019
|
|
156
|
BDRIDP/BAR/HZL/UZ-Rd(R)/01
|
Rehabilitation of road from of Dhanusikder Hat-Muladi Upazila road by BC from Ch. 0.00m-1000m.
|
BDRIDP
|
hizla
|
|
1.00
|
|
|
70.95
|
M/S Oshin Enterprise
|
56.45
|
|
28/05/2015
|
28/02/2016
|
100
|
|
|
|
|
157
|
BDRIDP/BAR/MHN/CCA-Rd/02
|
Improvement of road Purbo Yearbeg (Paloun Bari) - Trimohoni Big Road via Howlader Bari,Jamadder Bari Ebtadi Madrasha from ch.0.00 - 1610m with U-Drain (0.625m x 0.90m) at ch.1051m.
|
BDRIDP
|
mehendiganj
|
|
1.61
|
|
|
68.64
|
M/S Hasan Construction
|
68.60
|
|
19/01/2017
|
19/09/2017
|
70
|
|
|
08/04/2019
|
|
158
|
BDRIDP/BAR/MHN/UZ-Rd/02
|
Improvement of Ulania GC Aligonj(Hizla) road from Ch.1000-4000m under Mehandigonj Upazila,Barisal.
|
BDRIDP
|
mehendiganj
|
|
3.00
|
|
|
105.45
|
M/S Lutful Kabir
|
104.93
|
|
14/05/2017
|
14/02/2018
|
100
|
|
|
08/04/2019
|
|
159
|
BDRIDP/BAR/MHN/CCA-Rd/03
|
Improvement of Road from Posshim Yearbeg Dadpur GPS under Mehendiganj Upazila District Barisal ID 506625062aEarthwork Ch.1000 2760m b HBB Ch.1000 -2760m
|
BDRIDP
|
mehendiganj
|
|
1.76
|
|
|
59.60
|
M/S Amir Engineering Corporation
|
56.62
|
|
|
|
100
|
|
|
08/04/2019
|
|
160
|
BDRIDP/BAR/MHN/GC/01
|
Constructionof Langutia G C (i) Fish Shed (Size : 12m x 6m) (ii) 2 Nos Waste collection Pit (Dustbin) (Size : 1.4m x 1.4m) (iii) Multipurpose Shed (Size : 12m x 6m) (iv) Logistic Support for Langutia Bazar (v) Toilet Block (Size : 5.75m x 3.07m) (vi) 2 No
|
BDRIDP
|
mehendiganj
|
|
|
|
|
49.90
|
|
0.00
|
|
|
|
0
|
|
|
08/04/2019
|
|
161
|
BDRIDP/BAR/MHN/CCA-EW/01
|
Resectioning of Purbo Yearbeg (Paloun Bari)-Trimohoni Big Road via Howlader Bari, Jamadder Bari Ebtadi Madrasha at Ch. 0.00m-600m by Earth.
|
BDRIDP
|
mehendiganj
|
|
0.60
|
|
|
3.46
|
Nizam Uddin TalukderLCS No-1
|
3.46
|
|
18/12/2016
|
18/03/2017
|
100
|
|
|
08/04/2019
|
|
162
|
BDRIDP/BAR/MHN/UZ-EW/01
|
Resectioning of Ulania GC-Aligonj GC (Hizla) Road at Ch. 1000m-1600m
|
BDRIDP
|
mehendiganj
|
|
0.60
|
|
|
1.65
|
LCS No-1
|
1.65
|
|
|
|
100
|
|
|
08/04/2019
|
|
163
|
BDRIDP/BAR/MHN/UZR(R)-Rd/01
|
Rehabilitation of Patherhat GC - Kazirhat GC Road by BC at Ch.1500 - 2610m Under Mehendigonj Upazila, District-Barisal.
|
BDRIDP
|
mehendiganj
|
|
1.11
|
|
|
58.54
|
M/S Santu Traders
|
49.73
|
|
27/11/2014
|
27/04/2015
|
100
|
|
|
|
|
164
|
BDRIDP/BAR/MHN/CCA-Rd/01
|
Improvement of Mothertoli Bazar - Uttarchar road via Charekkaria road by BC (Ch.2170-3220m, Road Under Mehendigonj Upazila, District-Barisal.
|
BDRIDP
|
mehendiganj
|
|
1.05
|
|
|
53.27
|
M/S Nahid Enterprise
|
45.15
|
|
23/11/2014
|
23/04/2015
|
100
|
|
|
|
|
165
|
BDRIDP/BAR/MHN/CCA-St/01
|
Construction of 1.0 x 1.0m RCC Box culvert at Ch.3042 on Mothertoli Bazar - Uttarchar road via Charekkaria UP road Under Mehendigonj Upazila, District-Barisal.
|
BDRIDP
|
mehendiganj
|
|
|
|
|
2.23
|
M/S Hasib Enterprise
|
1.85
|
|
16/11/2014
|
15/03/2015
|
100
|
|
|
|
|
166
|
BDRIDP/BAR/MUL/UZ-St/01
|
Construction of 4 Nos Box Culvert on Mirdarhat GC-Nazirpur GCCR via Madrasharhat Nomorhat & Bangla Bazar road at Ch. 1020m, 1950m, 2360m & 3435m.
|
BDRIDP
|
muladi
|
506692004
|
|
|
|
77.98
|
M/S Misi Construction
|
87.72
|
|
28/07/2014
|
27/03/2015
|
100
|
|
|
08/04/2019
|
|
167
|
BDRIDP/BAR/MUL/UZ-Rd/01
|
Improvement of road from Mirdarhat GC-Nazirpur GCCR via Madrasharhat Nomorhat & Bangla Bazar road Ch. 0.00-3450m.
|
BDRIDP
|
muladi
|
|
3.45
|
|
|
244.06
|
M/S Lutful Kobir
|
207.44
|
|
20/08/2014
|
20/05/2015
|
100
|
|
|
08/04/2019
|
|
168
|
BDRIDP/BAR/MUL/CCA-Rd/01
|
Rehabilitation of road Raguya Kazirchar R & H - Joynal Master via H/O Sahajahan Dafader (Ch.0.00- 1000.00m. Road under Muladi upazila, Barisal District.
|
BDRIDP
|
muladi
|
506695135
|
1.00
|
|
|
41.73
|
M/S Santu Traders
|
35.45
|
|
27/11/2014
|
27/04/2015
|
100
|
|
|
08/04/2019
|
|
169
|
BDRIDP/BAR/MUL/UN-St/02
|
Construction of 20.00m long RCC Girder Bridge on Boropatherchar GPS at Ch. 0+650km Over Uttar Dakathia khal under Muladi Upazila, Barisal District.
|
BDRIDP
|
muladi
|
506693005
|
|
|
|
143.13
|
PTSL-MOTREE (PVT) LTD
|
128.81
|
|
16/08/2017
|
15/08/2018
|
100
|
|
|
08/04/2019
|
|
170
|
BDRIDP/BAR/MUL/UZ-St/03
|
Construction of 20.00m long RCC Girder Bridge on Mirdhar hat GC-Nazirpur GC at Ch. 4+500km Over Charkalekhan khal under Muladi Upazila, Barisal District.
|
BDRIDP
|
muladi
|
506692004
|
|
|
|
179.24
|
PTSL-MOTREE (PVT) LTD
|
161.32
|
|
16/08/2017
|
15/08/2018
|
100
|
|
|
08/04/2019
|
|
171
|
BDRIDP/BAR/MUL/UN-St/01
|
Construction of 21.00m long RCC Girder Bridge on Boropatherchar GPS at Ch.0900km over Uttar Char Dakatia Khal under Muladi Upazila Barisal District.
|
BDRIDP
|
muladi
|
|
|
|
|
157.96
|
M/S Islam Brothers
|
142.16
|
|
|
|
95
|
|
|
08/04/2019
|
|
172
|
BDRIDP/BAR/MUL/UZ-St/02
|
Construction of 45.00m long RCC Girder Bridge on Mirdhar hat GC-Harinathpur GC - Muladi Border at Ch.3+596km. Over Char Dumuritala khal under Muladi Upazila,Barisal District.
|
BDRIDP
|
muladi
|
506692002
|
|
45.00
|
|
244.35
|
M/S Islam Brothers
|
219.91
|
|
|
|
80
|
|
|
08/04/2019
|
|
173
|
BDRIDP/BAR/MUL/UZ-St/04
|
Construction of 25.00m long PC Girder Bridge on Mirdhar Hat GC-Nazirpur GC at ch.8380km over Banimardhan khal under Muladi Upazila Barisal.
|
BDRIDP
|
muladi
|
506692004
|
|
25.00
|
|
235.04
|
Orien Trading & Builders
|
211.53
|
|
|
|
90
|
|
|
08/04/2019
|
|
174
|
BDRIDP/BAR/MUL/UZ-St/05
|
Construction of 30.00m PC Girder Bridge on Mirdhar Hat GC-Nazirpur GC at Ch.7620km over Banimardhan Khal under Muladi UpazilaDistrict-Barisal
|
BDRIDP
|
muladi
|
506692004
|
|
30.00
|
|
210.22
|
M/S Amir Engineering Corporation and M.M Builders & Engineers
|
189.20
|
|
|
|
95
|
|
|
08/04/2019
|
|
175
|
BDRIDP/BAR/MUL/CCA-Rd/07
|
Improvement of road from Muladi-Mirdar Hat GCCR Kazi Ali Ahmed Bari Grostan Alauddin Dewan Bari under Muladi UpazilaBarisal.a Bituminus Surfacing wearing courseDC 0.0m - 375mb 1 No.1.3m x 1.3m RCC Box Culvert at ch.170m
|
BDRIDP
|
muladi
|
506695137
|
0.38
|
1.30
|
|
25.91
|
M/S Kohinoor Enterprise
|
23.32
|
|
25/01/2018
|
25/07/2018
|
25
|
|
|
08/04/2019
|
|
176
|
BDRIDP/BAR/MUL/UZ-Rd/02
|
a Improvement of Mirdar Hat GC Bashtala Bazar - Poddar hat- dumuritala -Dhanu Shikder Hat GC Horinathpur Road from Ch.2150m - 4415m under Muladi Upazila Barisal District.b Construction of 1 Nos. 1vent 2.0m x 2.0m RCC box culvert on Mirdar Hat GC Bashtala
|
BDRIDP
|
muladi
|
506692002
|
2.27
|
4.00
|
|
171.70
|
Orien Trading & Builders
|
154.53
|
|
|
|
40
|
|
|
08/04/2019
|
|
177
|
BDRIDP/BAR/MUL/CCA-Rd/09
|
Improvement of road from Talukder HatKhejurtala Ali Sikder bari by BC Start Pokhi Rostom fokir bari to Nomor hat via Sumsun Nahar Chowdhury Bari at Ch.0.0m -1000m under Muladi Upazila Barisal District.Salvaged Cost Tk 591644.00Improvement of road from Tal
|
BDRIDP
|
muladi
|
506694016
|
1.00
|
|
|
58.85
|
Orien Trading & Builders
|
52.97
|
|
|
|
60
|
|
|
08/04/2019
|
|
178
|
BDRIDP/BAR/MUL/CCA-Rd/08
|
Improvement of road from Batamara Paderhat Launch Ghat -Salimpur Bazar via Batamara Regd.Primary School via Aminul Haque Kabir Bari by BC at ch.200m - 1252m under Muladi Upazila Barisal.
|
BDRIDP
|
muladi
|
506695001
|
1.05
|
|
|
60.00
|
Md. Mahafuz Khan
|
54.00
|
|
|
|
15
|
|
|
08/04/2019
|
|
179
|
BDRIDP/BAR/MUL/CCA-Rd/10
|
Improvement of road from Balarmpur Bazar-Dumurtala GPS-Char Dumuritala Bissas Bari Mosque UNRG by BC at Ch. 0.000km-1.000km. under muladi upazila Barisal District
|
BDRIDP
|
muladi
|
506694094
|
1.00
|
|
|
57.02
|
M/S Ferdousi Construction
|
54.17
|
|
|
|
10
|
|
|
08/04/2019
|
|
180
|
BDRIDP/BAR/MUL/CCA-Rd/11
|
Improvement of road from Muladi-Bara Patarchar Ferry Ghat M by BC at Ch. 3.500km-4.065km. ID No.506694017 under muladi upazila Barisal District
|
BDRIDP
|
muladi
|
|
0.57
|
|
|
33.39
|
M/S AK Buidlers
|
31.72
|
|
14/06/2018
|
14/11/2018
|
10
|
|
|
08/04/2019
|
|
181
|
BDRIDP/BAR/MUL/CCA-Rd/12
|
Improvement of road from Haraz Sikder Bari to Laxmipur Nutun hat via Rashid Dhali Bari by BC at Ch. 0.900km-2.400km under muladi upazila Barisal District.Salvaged cost Tk.888105.00
|
BDRIDP
|
muladi
|
506695010
|
1.50
|
|
|
91.47
|
M/S R.S Construction
|
86.90
|
|
|
|
15
|
|
|
08/04/2019
|
|
182
|
LCS
|
Improvement of road by earth work from Mirdarhat GC-Nazirpur GCCR via Madrasharhat, Nomorhat & Bangla Bazar Ch.0-3450m.
|
BDRIDP
|
muladi
|
506692004
|
3.45
|
|
|
4.28
|
LCS No 01 to LCS No-10
|
4.28
|
|
22/05/2014
|
22/10/2014
|
100
|
|
|
08/04/2019
|
|
183
|
BDRIDP/BAR/MUL/CCA-EW/01
|
Earth work of road Raguya Kazirchar R&H-Joynal Master via H/Q Sahajahan Dafader Ch. 0.00m-1000m under Muladi upazila, Barisal District.
|
BDRIDP
|
muladi
|
|
1.00
|
|
|
2.22
|
Md Fazlu TafaderLCS No-1
|
2.22
|
|
18/11/2014
|
18/02/2015
|
100
|
|
|
08/04/2019
|
|
184
|
BDRIDP/BAR/MUL/CCA-EW/02
|
Earth work of road from Boraiya R&D to Prokas Mondol bari via Boraiya GPS at Ch. 0.00-585m under Muladi upazila, Barisal District.
|
BDRIDP
|
muladi
|
|
0.59
|
|
|
2.40
|
Md Kabir HossainLCS No-1
|
2.40
|
|
18/11/2014
|
18/02/2015
|
100
|
|
|
08/04/2019
|
|
185
|
BDRIDP/BAR/MUL/CCA-EW/03
|
Improvement of road from Bepari Bridge to Char Padma hat via Habib noli at Safipur UP (South Side of Amir Sarif Bridge to Madrasha Bazar via Front of Mojibur Rahaman Noli Bari) road by Earth work from Ch. 00-1250m under Muladi upazila, Barisal District.
|
BDRIDP
|
muladi
|
|
1.25
|
|
|
3.23
|
Fokrul AhosanLCS No-1
|
3.23
|
|
31/05/2015
|
30/09/2015
|
50
|
|
|
08/04/2019
|
|
186
|
BDRIDP/BAR/MUL/CCA-EW/04
|
Resectioning of road from Char Kalekhan Goni Bari-khalil Bepari bari road by Earth work from Ch. 0.00m-1550m.
|
BDRIDP
|
muladi
|
|
1.55
|
|
|
1.01
|
Md. Mojibor RohmanLCS No-1
|
1.01
|
|
30/08/2015
|
30/12/2015
|
100
|
|
|
08/04/2019
|
|
187
|
BDRIDP/BAR/UZP/UN-EW/01
|
Resectioning of Mirdar Hat GC (Bashtala Bazar)-Poddar hat-Dumuritala-Dhanu Shikder Hat GC (Horinatpur) at Ch. 2150m-2750m.
|
BDRIDP
|
muladi
|
|
0.60
|
|
|
2.50
|
LCS No-1
|
2.50
|
|
|
|
80
|
|
|
08/04/2019
|
|
188
|
BDRIDP/BAR/MUL/CCA-Rd/02
|
Improvement of Road from Boraiya R & HD to Prokas Mondol bari via Boraiya GPS at Ch.0+00km to 0+585km ,Road under Muladi upazila, Barisal District.
|
BDRIDP
|
muladi
|
|
0.59
|
|
|
27.63
|
M/S Santu Traders
|
23.48
|
|
27/11/2014
|
27/04/2015
|
100
|
|
|
|
|
189
|
BDRIDP/BAR/MUL/CCA-St/02
|
Construction of 1 No 4.00m×4.00m (3 Vent) RCC Box Culvert on Madrashar Hat (Start from Char Kalekhan College gate) to Charmalia Beparir Hat Road at ch. 0.00m.
|
BDRIDP
|
muladi
|
|
|
|
|
25.44
|
M/S Lutful Kobir
|
17.62
|
|
|
25/10/2015
|
100
|
|
|
|
|
190
|
BDRIDP/BAR/MUL/CCA-St/03
|
Construction of 2 Nos 4.00m×4.00m (2 Vent) RCC Box Culvert on Kashem Sharder Barir Pool-Kaetmara Kader Mirda Bari road at Ch. 750m & 1402m
|
BDRIDP
|
muladi
|
|
|
|
|
51.16
|
M/S Lutful Kobir
|
36.83
|
|
|
25/10/2015
|
100
|
|
|
|
|
191
|
BDRIDP/BAR/MUL/CCA-Rd(R)/04
|
Rehabilitation of road from Madrashar Hat (Start from Char Kalekhan College gate) to Charmalia Beparir Hat road by BC from Ch. 0.00m-2175m.
|
BDRIDP
|
muladi
|
|
2.18
|
|
|
89.69
|
M/S Topu Enterprise
|
71.05
|
|
18/05/2015
|
18/10/2016
|
100
|
|
|
|
|
192
|
BDRIDP/BAR/MUL/CCA-Rd/05
|
Improvement of road from Kashem Sharder Barir Pool-Kaetmara Kader Mirda Bari road by BC road Ch. 750m-2100m.
|
BDRIDP
|
muladi
|
|
1.35
|
|
|
54.50
|
M/S Topu Enterprise
|
48.25
|
|
18/05/2015
|
18/10/2016
|
100
|
|
|
|
|
193
|
BDRIDP/BAR/MUL/CCA-Rd/03
|
Improvement of road from Bepari Bridge to Char Padma hat via Habib noli at Safipur UP (South Side of Amir Sarif Bridge to Madrasha Bazar via Front of Mojibur Rahaman Noli Bari) road from Ch. 0.00m-1250m.
|
BDRIDP
|
muladi
|
|
1.25
|
|
|
33.10
|
Md Sirazul Islam Hanif
|
29.47
|
|
25/05/2015
|
25/05/2016
|
100
|
|
|
|
|
194
|
BDRIDP/BAR/MUL/CCA-St/01
|
Construction of 1 no 1 Vent 2.00m×2.00m RCC Box Culvert on Bepari Bridge to Char Padma hat via Habib noli at Safipur UP (South Side of Amir Sarif Bridge to Madrasha Bazar via Front of Mojibur Rahaman Noli Bari) road at Ch. 750m
|
BDRIDP
|
muladi
|
|
|
|
|
5.06
|
M/S Sraboni Enterprise
|
3.69
|
|
28/06/2015
|
27/12/2015
|
100
|
|
|
|
|
195
|
BDRIDP/BAR/MUL/CCA-Rd/06
|
Improvement of road from Char Kalekhan Goni Bari-Khalil Bepari Bari road by BC from Ch. 0.00m-1550m.
|
BDRIDP
|
muladi
|
|
1.55
|
|
|
89.33
|
Md. Khair Hossain
|
70.59
|
|
15/10/2015
|
15/04/2016
|
100
|
|
|
|
|
196
|
BDRIDP/BAR/MUL/CCA-St/04
|
Construction of 1 vent 4.00m×4.00m and 1 vent 1.00m×1.00m RCC Box Culvert on Char Kalekhan Goni Bari-Khalil Bepari Bari road at Ch.182m & 330m.
|
BDRIDP
|
muladi
|
|
|
|
|
19.37
|
Md. Khair Hossain
|
14.63
|
|
15/10/2015
|
15/04/2016
|
100
|
|
|
|
|
197
|
BDRIDP/BAR/MUL/CCA-St/05
|
Construction of 12.00m RCC Slab Bridge on Char Pakkia GPS at Ch.0+000km over Char Pakkia Khal.
|
BDRIDP
|
muladi
|
|
|
|
|
100.68
|
M/S Shafi Enterprise
|
77.28
|
|
13/02/2017
|
13/12/2017
|
100
|
|
|
|
|
198
|
BDRIDP/BAR/UZP/CCA-St/02
|
Construction of 1No.0.625m x 0.600m U-Drain & 1No.2 x 4.0m x 4.0m RCC Box Culvert on Goria Natunhat to Fakirbari via Gomostabari Corner, H/O Hazi Makbul Molla, Santu Market ,Nurani Madrasha & H/O Mr.Habibur Rahman road at Ch.650m & 816m.
|
BDRIDP
|
uzirpur
|
|
|
5.00
|
|
25.86
|
Md Zakir Hossain Mia
|
20.15
|
|
30/11/2014
|
30/05/2015
|
100
|
|
|
08/04/2019
|
|
199
|
BDRIDP/BAR/UZP/UZ-Rd /02
|
Improvement of Road from Satla -Chowmuhani (Bisherkandi upto Banaripara Upazila) [Satla GC (Satla H. School) -Razapur Chowmohoni-Bisherkandi GC Road) At Ch.0.0m -2605m under uzirpur Upazila, Barisal.
|
BDRIDP
|
uzirpur
|
506942007
|
2.61
|
|
|
183.15
|
M/S Hasan Construction
|
142.76
|
|
|
|
60
|
|
|
08/04/2019
|
|
200
|
BDRIDP/BAR/UZP/UZ-Rd/03
|
Improvement of Road from Kalirbazar GC - Barisal Dhaka NHW - Sikerpur R & H Road at Ch.1754 - 4050m under Uzirpur Upazila, Barisal.
|
BDRIDP
|
uzirpur
|
506942015
|
2.30
|
|
|
147.54
|
M/S Hasan Construction
|
115.01
|
|
|
|
75
|
|
|
08/04/2019
|
|
201
|
BDRIDP/BAR/UZP/UZ-RdR/04
|
Rehabilitation of Harta Chowmuhani Bisherkandi Harta GC - Bisharkandi GC Road at Ch.0.00m - 2600m including 04 Nos 0.625m x 0.600 Drainage CulvertU-Drain at ch.805m 933m 1148m & 1248m under Uzirpur Upazila Barisal District Salvaged Value 4053176.00
|
BDRIDP
|
uzirpur
|
506942009
|
2.60
|
|
|
178.27
|
M/S S H Enterprise
|
184.00
|
|
15/03/2018
|
15/03/2019
|
70
|
|
|
08/04/2019
|
|
202
|
BDRIDP/BAR/UZP/UN-Rd/01
|
a Improvement of Uzirpur H/Q-Bamrail UP Office -Gondesor BazarUzirpur UZHQ Girls School-Kholna More-Bamrail R&H from Ch.3400m - 5740m under Banaripara UpazilaBarisal District. b Construction of 2Nos U-Drain on the same road at Ch.4695m & 5090m.
|
BDRIDP
|
uzirpur
|
506943007 506942018
|
2.34
|
|
|
150.61
|
M/S Niaz Traders
|
135.55
|
|
|
|
40
|
|
|
08/04/2019
|
|
203
|
BDRIDP/BAR/UZP/UN-St/01
|
Construction of 12.00m Long RCC Girder Bridge over Chowdhuri Hat - Hasti Shundi via Daberkul road infront of A. Latif MasterDaberkul Chowmohani - Chowmohini Sere Bangla road at ch. 00.0m under Uzirpur Upazila Barisal District.
|
BDRIDP
|
uzirpur
|
506943004
|
|
12.00
|
|
0.00
|
M.M Builders & Engineers
|
75.35
|
|
|
|
100
|
|
|
08/04/2019
|
|
204
|
BDRIDP/BAR/UZP/CCA-Rd/04
|
Improvement of Old Sikerpur Bandar-Abul Hasan Mridhas House Connecting road under Uzirpur Upazila Barisal a Earthwork Ch.0.0m - 360m b Bituminous Carpetting Ch.0.0m - 360m c U-Drain 01 no at Ch.117.
|
BDRIDP
|
uzirpur
|
506945281
|
0.36
|
|
|
27.39
|
M/S Kohinoor Enterprise
|
24.65
|
|
29/04/2018
|
29/08/2018
|
35
|
|
|
08/04/2019
|
|
205
|
BDRIDP/BAR/UZP/CCA-Rd/03
|
Improvement of road from Guthia kakradhari Connecting road North side of Khaleque Mollas House of Dahorpara GPS via Mojid Masters House under Uzirpur Upazila Barisal a Earthwork Ch.0.0m -1550m b Bituminous Carpetting Ch.0.0m - 1550m c U-Drain 04 nos at Ch
|
BDRIDP
|
uzirpur
|
506944084
|
1.55
|
|
|
120.43
|
Md. Mahafuz Khan
|
108.39
|
|
|
|
65
|
|
|
08/04/2019
|
|
206
|
BDRIDP/BAR/UZP/Gha/01
|
Construction of Typical Ghat at Satla Bazar under Uzirpur Upazila Barisal .
|
BDRIDP
|
uzirpur
|
|
|
|
|
25.65
|
M/S S H Enterprise
|
24.61
|
|
|
|
40
|
|
|
08/04/2019
|
|
207
|
BDRIDP/BAR/UZP/UZ-EW/01
|
Resectioning of road from Dhamura-Sholok Batajore (Upto Gouranadi Upazila Border) Road from Ch. 0.00m-700m.
|
BDRIDP
|
uzirpur
|
506942005
|
0.70
|
|
|
2.59
|
Yasin SarderLCS No-1
|
2.59
|
|
15/02/2016
|
30/04/2016
|
100
|
|
|
08/04/2019
|
|
208
|
BDRIDP/BAR/UZP/UZ-EW/02
|
Resectioning of Road from Satla-Chowmuhani (Bisherkandi upto Banaripara Upazila) {Satla GC (Satla H. School)-Razapur Chowmohoni-Bisherkandi GC Road} at Ch. 0.00m-1100m.
|
BDRIDP
|
uzirpur
|
506942007
|
1.10
|
|
|
4.19
|
Md. Shahidul IslamLCS No-1
|
4.19
|
|
|
30/04/2017
|
80
|
|
|
08/04/2019
|
|
209
|
BDRIDP/BAR/UZP/UZ-EW/03
|
Resectioning of Road from Kalirbazar GC-Barisal Dhaka NHW-Sikerpur R&H Road Ch. 1754m-2850m.
|
BDRIDP
|
uzirpur
|
506942015
|
1.10
|
|
|
4.22
|
Kamrun NesaLCS No-1
|
4.22
|
|
18/12/2016
|
18/03/2017
|
75
|
|
|
08/04/2019
|
|
210
|
BDRIDP/BAR/UZP/UN-EW/01
|
Resectioning of Uzirpur H/Q Bamril UP Office-Gondesor Bazar (Uzirpur UZHQ Girls School-Kholna More-Bamril R&H) From Ch. 3400m-3900m By Earth.
|
BDRIDP
|
uzirpur
|
506943007 506942018
|
0.50
|
|
|
4.35
|
Md. Ziaul HaqueLCS No-1
|
4.35
|
|
31/05/2017
|
31/10/2017
|
100
|
|
|
08/04/2019
|
|
211
|
BDRIDP/BAR/UZP/UZ-EW/04
|
Resectioning of Harta Chowmuhani (Bisherkandi) {Harta GC-Bisherkandi GC} Road at Ch. 0.00m-1000m
|
BDRIDP
|
uzirpur
|
506942009
|
1.00
|
|
|
5.13
|
Shilpi BiswasLCS No-1
|
5.13
|
|
30/10/2017
|
30/03/2018
|
80
|
|
|
08/04/2019
|
|
212
|
BDRIDP/BAR/UZP/CCA-Rd/05
|
Part A Improvement of road from Muktijodda Milon Kendra Connecting road Harasia road.i Carpeting DC Ch. 0.00m-900m. ii 3 Nos.0.625mx0.600m U-Drain at Ch.10m365m665m.Part B Improvement of road from East Joysree Village road.i Carpeting DC Ch. 0.00m-1000m.ii 2 Nos.0.625mx0.600m U-Drain at Ch.605m865m. Salvaged Cost Tk 141267.00Part C Improvement of road from Jugihati-Chokder bari Jame Mosque to Damodarkathi Tri mukhi Atok road by DC at Ch.0.00m-1050.00m with 1 No.4.30mx4.30m RCC Box Culvert at Ch.560m. 3 Nos.0.625mx0.600m U-Drain at Ch.130m760m & 835m. Under Uzirpur Upazila Barishal District.
|
BDRIDP
|
uzirpur
|
506945170 506945028 506945172
|
2.50
|
6.00
|
|
23428700.00
|
|
0.00
|
|
|
|
0
|
|
|
08/04/2019
|
|
213
|
BDRIDP/BAR/UZ/CCA-St/01
|
Construction of 15.00m RCC Girder Bridge at Ch. 1600m on Daberkul-Dhamura Road over the Thandar Khal infornt of Wazed Ali Sikder GPS.
|
BDRIDP
|
uzirpur
|
|
|
15.00
|
0
|
65.44
|
M/S Safi Enterprise
|
55.68
|
11/06/2014
|
18/06/2014
|
17/06/2015
|
100
|
0.00
|
0
|
15/04/2015
|
|
214
|
BDRIDP/BAR/UZP/CCA-Rd/01
|
Improvement of road from Goria Natunhat to Fakirbari via Gomostabari Corner, H/O Hazi Makbul Molla, Santu Market, Nurani Madrasha & H/O Mr.Habibur Rahman (Beer Protik) by BC from Ch.0.00-1500m under Uzirpur Upazila, Barisal.
|
BDRIDP
|
uzirpur
|
|
1.50
|
|
|
63.78
|
Md Sirazul Islam Hanif
|
51.68
|
|
|
|
100
|
|
|
|
|
215
|
BDRIDP/BAR/UZP/CCA-Rd/02
|
Improvement of road from Paschim Satla WAPDA to Satla Kheyaghat via H/O Fazlul Hoque Hawlader & Mosque By HBB from Ch. 0.00-375m.
|
BDRIDP
|
uzirpur
|
|
0.38
|
|
|
13.16
|
M/S Lutful Kabir
|
12.26
|
|
|
|
100
|
|
|
|
|
216
|
BDRIDP/BAR/UZP/CCA-St/03
|
Construction of 2 Nos 1 Vent 2.00×2.00m RCC Box Culvert on the Khal on the road from Mosang Bazar South side of river towards the west (Mosang Khal GCCR to Mosang Jamey Mosque road) at Ch 10m & 400m.
|
BDRIDP
|
uzirpur
|
|
|
|
|
33.97
|
Md Zakir Hossain Mia
|
26.83
|
|
18/05/2015
|
18/10/2015
|
100
|
|
|
|
|
217
|
BDRIDP/BAR/UZP/UZ-Rd(R)/01
|
Rehabilitation of road from Dhamura-Sholok Batajore (Upto Gouranadi Upazila Border) road from Ch. 0.00m-2100m.
|
BDRIDP
|
uzirpur
|
|
2.10
|
|
|
102.15
|
M/S G M Construction
|
85.23
|
|
|
|
100
|
|
|
|
|
218
|
CIB-Bar-W-132
|
Construction of 24.00 m RCC Girder Bridge on Sharikol Bondor Khal of Tiler Char Pacca Bridge to Suren Sikder Hat Road at Ch.2100 m Under Babugong Upazila, Dist. Barishal
[Road ID: 506034040]. CIB-Bar-W-132
|
CIBRR
|
babuganj
|
506034040
|
|
24.00
|
65
|
257.33
|
M/S. Amir Engineering Corporation.
|
231.59
|
14/11/2022
|
21/11/2022
|
05/05/2024
|
98
|
150.50
|
65
|
05/02/2025
|
|
219
|
CIB-Bar-W-82
|
"Construction of 619.00m Long Arch & RCC Girder Bridge Over Purbo Char Kutubpur Arial kha River on Gournadi Bandar GC to Muladi via Kutubpur Road at Ch.630m Under Gournadi Upazila, Dist. Barishal
[Road ID: 506322016].
CIB-Bar-W-82"
|
CIBRR
|
gouranadi
|
506322016
|
|
619.00
|
16
|
8066.86
|
Nabarun Traders Ltd.
|
9135.81
|
15/06/2023
|
22/06/2023
|
21/06/2026
|
19
|
1442.00
|
16
|
05/02/2025
|
|
220
|
CIB-Bar-W-23
|
Const. of 440m long PSC Girder Bridge over Kodomtola (Naya Bhagoni) river on Shaestabad GC (Brisal Sadar) Hizla Upazila HQ via Gazirhat, Kazirhat GC, Miachat and Ekkotarhat at Ch. 00.00m under Mehendiganj Upazila, Dist. Barishal
|
CIBRR
|
mehendiganj
|
506622008
|
|
440.00
|
100
|
3901.17
|
MD.MAHAFUZ KHAN-PROJECT BUILDERS LIMITED(JV)
|
3700.00
|
09/08/2018
|
16/08/2018
|
04/10/2022
|
100
|
3677.69
|
100
|
05/02/2025
|
|
221
|
CIB-Bar-W-131
|
"Construction of 280.00m Long Arch & RCC Girder Bridge Over Jyanti Branch river near Talukderhat Bazar ( Khejurtala Bazar) on Muladi-Barapatachar Ferry Ghat Road at Ch.5900m Under Muladi Upazila, Dist. Barishal"
|
CIBRR
|
muladi
|
506694017
|
|
280.00
|
36
|
4146.37
|
Md.Mahfug Khan Ltd,Prop: Md.Mahfug Khan.
|
3858.46
|
13/06/2023
|
20/06/2023
|
20/06/2026
|
43
|
1393.70
|
36
|
05/02/2025
|
|
222
|
CRMIDP/BAR/W-193
|
Jamvita Hat
|
CRMIDP
|
banaripara
|
|
|
|
38
|
360.00
|
"M/S. Amir Engineering Corporation College Row, Barishal. "
|
313.10
|
27/06/2022
|
|
17/07/2022
|
50
|
118.00
|
38
|
27/07/2022
|
|
223
|
CRMIDP/BAR/W-196
|
Badamtoli Bazar
|
CRMIDP
|
mehendiganj
|
|
|
|
54
|
231.00
|
M/S Layla Builders
|
196.35
|
26/06/2022
|
|
05/06/2021
|
70
|
107.00
|
54
|
26/07/2022
|
|
224
|
CRMIDP/BAR/W-198
|
Shikarpur Hat & Bazar
|
CRMIDP
|
uzirpur
|
|
|
|
|
252.00
|
M/S Rupali Construction & Shad Enterprise(JV)
|
206.40
|
15/10/2020
|
|
15/10/2020
|
25
|
|
|
26/07/2022
|
|
225
|
GSIDP/BRS/DW-1
|
Improvement of Kathira Sree Sree Radha Gobindo Mondir, Union: Under Goila.[Latitude:22.94826, Longitude: 90.13975.]
|
GSIDP
|
agailjhara
|
|
|
|
|
5.00
|
M/S. Sharif Enterprise
|
5.25
|
|
21/06/2018
|
|
0
|
|
|
|
|
226
|
GSIDP/BRS/DW-2
|
Improvement of RamanandarAk High School kali Mondir, Union: Rajihar.[Latitude:23.00438, Longitude: 90.14028.]
|
GSIDP
|
agailjhara
|
|
|
|
|
5.00
|
M/S. Yamin Traders
|
5.25
|
|
21/06/2018
|
21/09/2018
|
0
|
|
|
|
|
227
|
GSIDP/BRS/DW-3
|
Improvement of Uttar Somayerpar kali Mondir, Union: Bagda.[Latitude:22.96699, Longitude: 90.09489.]
|
GSIDP
|
agailjhara
|
|
|
|
|
5.00
|
M/S. Sharif Enterprise
|
5.25
|
|
21/06/2018
|
21/09/2018
|
100
|
|
|
|
|
228
|
GSIDP/BRS/DW-4
|
Improvement of Oichar math Radha Gobindo Mondir, Union: Goila.[Latitude:22.9383, Longitude: 90.16049.]
|
GSIDP
|
agailjhara
|
|
|
|
|
5.00
|
M/S. Sharif Enterprise
|
5.25
|
|
21/06/2018
|
21/09/2018
|
0
|
|
|
|
|
229
|
GSIDP/BRS/DW-5
|
Improvement of East Bakal Gobindo Mondir, Union: Bakal.[Latitude:22.98346, Longitude: 90.146.]
|
GSIDP
|
agailjhara
|
|
|
|
|
5.00
|
M/S. Yamin Traders
|
5.25
|
|
21/06/2018
|
21/09/2018
|
0
|
|
|
|
|
230
|
GSIDP/BRS/DW-6
|
Improvement of Vajna Jamay Mosque, Union: Rajihar.[Latitude:23.03356, Longitude: 90.15457.]
|
GSIDP
|
agailjhara
|
|
|
|
|
5.00
|
M/S. Yamin Traders
|
5.25
|
|
21/06/2018
|
21/09/2018
|
0
|
|
|
|
|
231
|
GSIDP/BRS/DW-7
|
Improvement of Sorbari Sorbojonin Durga Mondir, Union: Bakal.[Latitude:22.96423, Longitude: 90.11635.]
|
GSIDP
|
agailjhara
|
|
|
|
|
5.00
|
M/S. Yamin Traders
|
5.25
|
|
21/06/2018
|
21/09/2018
|
100
|
|
|
|
|
232
|
GSIDP/BRS/DW-128
|
Improvement of Baltun Noor Jame Mosjid , Union: Sayedkati , Latitude: 22.8425, Longitude:90.1349 .
|
GSIDP
|
banaripara
|
|
|
|
|
3.00
|
M/S. Khan Store
|
2.85
|
10/02/2019
|
|
17/05/2019
|
100
|
|
|
08/04/2019
|
|
233
|
GSIDP/BRS/DW-112
|
Improvement of Brammonkathi Nesaria Sador Jame Mosjid , Union: Banaripara , Latitude: 22.7722, Longitude: 90.1379
|
GSIDP
|
banaripara
|
|
|
|
|
3.00
|
M/S. Laily Enterprise
|
2.85
|
|
|
|
0
|
|
|
08/04/2019
|
|
234
|
GSIDP/BRS/DW-113
|
Improvement of Darbesh Meseria Jame Mosjid , Union: Banaripara , Latitude:22.7636 , Longitude: 90.1559.
|
GSIDP
|
banaripara
|
|
|
|
|
3.00
|
kathalia Builders
|
2.85
|
|
|
|
0
|
|
|
08/04/2019
|
|
235
|
GSIDP/BRS/DW-114
|
Improvement of Kajlaher Sharbojonin durga Mondir , Union: Banaripara , Latitude: 22.7702, Longitude: 90.1265.
|
GSIDP
|
banaripara
|
|
|
|
|
3.00
|
M/S. Mothers Construction
|
2.85
|
|
|
|
0
|
|
|
08/04/2019
|
|
236
|
GSIDP/BRS/DW-115
|
Improvement of Banaripara College Field , Union: Banaripara , Latitude: 22.7821 , Longitude: 90.1558.
|
GSIDP
|
banaripara
|
|
|
|
|
3.00
|
M/S. Ma enterprise
|
2.85
|
|
|
|
0
|
|
|
08/04/2019
|
|
237
|
GSIDP/BRS/DW-116
|
Improvement of Dakhin Najirpur High School Field under Dakhin Najirpur union [Latitude: 22.7801, Longitude: 90.1540]
|
GSIDP
|
banaripara
|
|
|
|
|
3.00
|
M/S. Kazi Holding
|
2.85
|
|
|
|
0
|
|
|
08/04/2019
|
|
238
|
GSIDP/BRS/DW-117
|
Improvement of Banaripara Muslim Graveyeard Jame Mosjid , Union: Banaripara , Latitude: 22.7883, Longitude:90.1560 .
|
GSIDP
|
banaripara
|
|
|
|
|
3.00
|
M/S. Ma enterprise
|
2.85
|
|
|
|
0
|
|
|
08/04/2019
|
|
239
|
GSIDP/BRS/DW-118
|
Improvement of Banaripara Central Sarbojania Durga Mondir, Union: Banaripara , Latitude: 12.7850, Longitude: 90.158.
|
GSIDP
|
banaripara
|
|
|
|
|
4.00
|
M/S. Laily Enterprise
|
3.80
|
|
|
|
0
|
|
|
08/04/2019
|
|
240
|
GSIDP/BRS/DW-119
|
Improvement of Kachua Gharami Bari Jame Mosjid , Union: Baisari , Latitude: 22.7984, Longitude: 90.1333.
|
GSIDP
|
banaripara
|
|
|
|
|
3.00
|
M/S. Khan Store
|
2.85
|
|
|
|
0
|
|
|
08/04/2019
|
|
241
|
GSIDP/BRS/DW-120
|
Improvement of Baisary Bozlul Hoque Collage Field , Union: Baisary , Latitude: 22.7987, Longitude:90.1224 .
|
GSIDP
|
banaripara
|
|
|
|
|
3.00
|
M/S. Khan Store
|
2.85
|
10/02/2019
|
|
17/05/2019
|
10
|
|
|
08/04/2019
|
|
242
|
GSIDP/BRS/DW-121
|
Improvement of Narottompur Baitunnur Jame Mosjid , Union: Saliabakpur , Latitude: 22.7791, Longitude: 90.1698.
|
GSIDP
|
banaripara
|
|
|
|
|
4.00
|
M/S. Meem Emterprise
|
3.80
|
17/01/2019
|
|
24/04/2019
|
0
|
|
|
08/04/2019
|
|
243
|
GSIDP/BRS/DW-122
|
Improvement of Maddho Morichbunia Edgha , Union: Bisarkandi , Latitude:22.8352 , Longitude: 90.0525.
|
GSIDP
|
banaripara
|
|
|
|
|
3.00
|
M/S. Khan Store
|
2.85
|
10/02/2019
|
|
17/05/2019
|
10
|
|
|
08/04/2019
|
|
244
|
GSIDP/BRS/DW-123
|
Improvement of Moluhar Poboner Hat Shahe Jame Mosjid , Union: Iluhar , Latitude:22.8001 , Longitude: 90.0700.
|
GSIDP
|
banaripara
|
|
|
|
|
3.00
|
M/S. Laily Enterprise
|
2.85
|
|
|
|
0
|
|
|
08/04/2019
|
|
245
|
GSIDP/BRS/DW-124
|
Improvement of Jame Mosjid Near Moluhar High School , Union: Iluhar , Latitude: 22.8068 , Longitude: 90.0585.
|
GSIDP
|
banaripara
|
|
|
|
|
3.00
|
M/S. Twice a Construction
|
2.85
|
|
|
|
0
|
|
|
08/04/2019
|
|
246
|
GSIDP/BRS/DW-125
|
Improvement of Udaykati Bottola Jame Mosjid , Union: Banaripara , Latitude:22.7986 , Longitude: 90.1247.
|
GSIDP
|
banaripara
|
|
|
|
|
3.00
|
M/S. Khan Store
|
2.85
|
|
10/02/2019
|
17/05/2019
|
10
|
|
|
08/04/2019
|
|
247
|
GSIDP/BRS/DW-126
|
Improvement of Tetla Central Sarbojanin Durga Mondir , Union: Udaykati , Latitude: 22.8171, Longitude: 90.1077.
|
GSIDP
|
banaripara
|
|
|
|
|
3.00
|
M/S. Nusrat Traders,
|
2.85
|
07/02/2019
|
|
14/05/2019
|
10
|
|
|
08/04/2019
|
|
248
|
GSIDP/BRS/DW-127
|
Improvement of Lobonsara Eidga , Union Udaykati, Latitude: 22.8014 , Longitude: 90.1233.
|
GSIDP
|
banaripara
|
|
|
|
|
3.00
|
M/S. Nusrat Traders,
|
2.85
|
07/02/2019
|
|
14/05/2019
|
10
|
|
|
08/04/2019
|
|
249
|
GSIDP/BRS/DW-129
|
Improvement of Chakhar Kalir Bazar Sarbojanin Durga Mondir , Union: Udaykati, Latitude: 22.8150, Longitude: 90.1762.
|
GSIDP
|
banaripara
|
|
|
|
|
3.00
|
M/S. Kazi Holding
|
2.85
|
|
|
|
0
|
|
|
08/04/2019
|
|
250
|
GSIDP/BRS/DW-130
|
Improvement of Jame Mosjid at Chakhar Bazar, Union: Chakhar , Latitude: 22.8069 , Longitude: 90.1924.
|
GSIDP
|
banaripara
|
|
|
|
|
4.00
|
M/S. Twice a Construction
|
3.80
|
24/01/2019
|
|
01/05/2019
|
10
|
|
|
08/04/2019
|
|
251
|
GSIDP/BRS/DW-131
|
Improvement of Kachua Shalia jame Mosjid , Union : Baisari , Latitude: 22.7969, Longitude: 90.1392.
|
GSIDP
|
banaripara
|
|
|
|
|
3.00
|
kathalia Builders
|
2.85
|
|
|
|
0
|
|
|
08/04/2019
|
|
252
|
GSIDP/BRS/SDW-155
|
Improvement of Billogram jamey-E-Mosque ,Union : Mahilara .[ Latitude: 22.9459,Longitude: 90.2085]
|
GSIDP
|
gouranadi
|
|
|
|
|
3.00
|
|
0.00
|
|
|
|
0
|
|
|
08/04/2019
|
|
253
|
GSIDP/BRS/SDW-164
|
Improvement of Poschim Hosnabad Jamey-E-Mosque,Union: Sorikal.[ Latitude: 22.925757,Longitude: 90.31471.]
|
GSIDP
|
gouranadi
|
|
|
|
|
3.00
|
|
0.00
|
|
|
|
0
|
|
|
08/04/2019
|
|
254
|
GSIDP/BRS/DW-8
|
Improvement of Gournadi Government College Mosque, Union: Gournadi Pourashava. [Latitude:22.973337, Longitude: 90.221418.]
|
GSIDP
|
gouranadi
|
|
|
|
|
5.00
|
M/S Talukder Enterprise
|
5.25
|
|
14/06/2018
|
14/09/2018
|
50
|
|
|
|
|
255
|
GSIDP/BRS/DW-9
|
Improvement of Uttar Nathoi Mohammadia Jam-E-Mosque, Union: Gournadi Pourashava [Latitude:23.46339, Longitude: 90.415936.]
|
GSIDP
|
gouranadi
|
|
|
|
|
5.00
|
M/S Talukder Enterprise
|
5.25
|
|
14/06/2018
|
14/09/2018
|
50
|
|
|
|
|
256
|
GSIDP/BRS/DW-10
|
Improvement of Matubberbari Jam-E-Mosque, Union: Gournadi Pourashava.[ Latitude:22.961328, Longitude: 90.238885.]
|
GSIDP
|
gouranadi
|
|
|
|
|
10.00
|
M/S Talukder Enterprise
|
10.50
|
|
14/06/2018
|
14/09/2018
|
10
|
|
|
|
|
257
|
GSIDP/BRS/DW-11
|
Improvement of Dakkhin Palordi Shasan, Union: Gournadi Pourashava. [Latitude :23.075097, Longitude: 90.163662.]
|
GSIDP
|
gouranadi
|
|
|
|
|
5.00
|
M/S Talukder Enterprise
|
5.25
|
|
14/06/2018
|
14/09/2018
|
100
|
|
|
|
|
258
|
GSIDP/BRS/DW-12
|
Improvement of Bangila Mosque, Union: Barthi.[Latitude:23.074401, Longitude:90.163094.]
|
GSIDP
|
gouranadi
|
|
|
|
|
5.00
|
M/S Talukder Enterprise
|
5.25
|
|
14/06/2018
|
14/09/2018
|
90
|
|
|
|
|
259
|
GSIDP/BRS/DW-13
|
Improvement of Dakkhin Kashemabad Mosque, Union: Gournadi Pourashava. [Latitude:22.941808, Longitude: 90.233536.]
|
GSIDP
|
gouranadi
|
|
|
|
|
5.00
|
M/S Talukder Enterprise
|
5.25
|
|
14/06/2018
|
14/09/2018
|
100
|
|
|
|
|
260
|
GSIDP/BRS/DW-14
|
Improvement of Jangalputty Gomosta Para Jam-E-Mosque, Union:Mahilara. [Latitude:22.954000, Longitude: 90.217169.]
|
GSIDP
|
gouranadi
|
|
|
|
|
3.00
|
|
0.00
|
|
14/06/2018
|
14/09/2018
|
100
|
|
|
|
|
261
|
GSIDP/BRS/DW-15
|
Improvement of Showara Village in front of Captain Harolal Gangoli ShibMondir, Union:Gournadi. [Latitude:22.961328, Longitude: 90.238885.]
|
GSIDP
|
gouranadi
|
|
|
|
|
3.00
|
|
0.00
|
|
14/06/2018
|
14/09/2018
|
100
|
|
|
|
|
262
|
GSIDP/BRS/SDW-156
|
Improvement of Bhamura Bazar Sarbojonin Horee Durga Mondir,Union : Solok .[ Latitude: 22.891529,Longitude: 90.1978644.]
|
GSIDP
|
uzirpur
|
|
|
|
|
3.00
|
|
0.00
|
|
|
|
0
|
|
|
08/04/2019
|
|
263
|
IBRP/Bari/Gour/main/Brg-07
|
Maintenance of 22.00m Long Iron Bridge on Tarakupi Fakir bari NHW to Madra GPS Road at Ch.650m
|
IBRP
|
gouranadi
|
506324046
|
|
22.00
|
99
|
14.28
|
M/S Kohinoor Enterprise
|
15.00
|
06/05/2019
|
20/05/2019
|
13/09/2019
|
100
|
14.88
|
99
|
15/07/2020
|
|
264
|
Package No: IBRP/Bari/Gour/main/Brg-07
|
Maintenance of 22.00m Long Iron Bridge on Tarakupi Fakir bari NHW to Madra GPS Road at Ch.650m
|
IBRP
|
gouranadi
|
506324046
|
|
22.00
|
55
|
352.04
|
M/S Amin Engineer
|
307.33
|
11/04/2019
|
25/04/2019
|
20/04/2020
|
60
|
168.00
|
55
|
14/07/2020
|
|
265
|
IBRP/Bari/Hiz/Rehab/Brg-05
|
Rehabilitation of 15m Long Iron Bridge on Chaygown Bazar - Gangapur GPS Road near the H/O Md. Nurul Islam Palowan at Ch.4380m
|
IBRP
|
hizla
|
506365034
|
|
15.00
|
100
|
19.15
|
M/S Akon Enterprise
|
18.19
|
30/04/2019
|
14/05/2019
|
07/10/2020
|
100
|
18.19
|
100
|
15/07/2020
|
|
266
|
IBRP/Bari/Hiz/main/Brg-06
|
Rehabilitation of 25m Long Iron Bridge on Chaygown Bazar - Gangapur GPS Road Near the H/O Md. Mannan Bepari at Ch.5500m
|
IBRP
|
hizla
|
506365034
|
|
25.00
|
100
|
31.69
|
Kathalia Builders
|
30.11
|
25/04/2019
|
09/05/2019
|
02/11/2019
|
100
|
30.11
|
100
|
15/07/2020
|
|
267
|
IBRP/Bari/Hiz/Rehab/Brg-03
|
Rehabilitation of 25m Long Iron Bridge on Hizla Gourabdi UP office via Ekota Bazar - Sankorpasha Bazar Road near the H/O Jahangir Bagha at Ch.3850m
|
IBRP
|
hizla
|
506363001
|
|
25.00
|
100
|
35.47
|
M/S Tuhuria & Rafi Enterprise
|
33.70
|
07/05/2019
|
22/05/2020
|
13/11/2019
|
100
|
33.65
|
100
|
14/07/2020
|
|
268
|
IBRP/Bari/Hiz/Rehab/Brg-04
|
Maintenance of 26m Long Iron Bridge on Hizla Gourabdi UP office via Ekota Bazar-Sankorpasha Bazar Road near the H/O Khalil Maji at Ch.4150m
|
IBRP
|
hizla
|
506363001
|
|
26.00
|
100
|
9.03
|
M/S SAGAR ENTERPRISE,
|
8.58
|
25/04/2019
|
09/05/2020
|
02/09/2019
|
100
|
8.58
|
100
|
14/07/2020
|
|
269
|
IBRP/Bari/ Uzir/Brg-02
|
Construction of 44.0m Long RCC Girder Bridge on Dhamura - Satla Road
|
IBRP
|
uzirpur
|
506942004
|
|
44.00
|
0
|
352.04
|
M/S Amir Engineering
|
307.33
|
17/03/2019
|
28/03/2019
|
15/10/2020
|
2
|
0.00
|
0
|
02/04/2019
|
|
270
|
IRIDP-2/BRS/DW-183
|
Construction of 16.00m Bridge on Sabikhar par Needs office-Nagarbari GPS-Paschim Sujankati Narayan Boiragir's house over Agailjhara Poiserhat khal at ch.1450m. ID NO 506025070 M/S
|
IRIDP-2
|
agailjhara
|
506025070
|
|
|
|
121.89
|
Mother Engineering
|
124.32
|
04/04/2018
|
|
11/04/2019
|
40
|
|
|
02/04/2019
|
|
271
|
IRIDP-2/BRS/DW-184
|
Construction of 16.00m Bridge on Muktijodda Complex-Upazila H.Q via livestock office Road.at ch.12.0m ID NO 506025225
|
IRIDP-2
|
agailjhara
|
506025225
|
|
|
|
118.28
|
M/S Mother Engineering
|
120.84
|
04/04/2018
|
|
11/03/2019
|
50
|
|
|
02/04/2019
|
|
272
|
IRIDP-2/BRS/DW-57
|
Improvement of Choddyamada Changutia Shihipasharoad,( Ch. 00m - 4567m) (b) Construction of 01 no 3.00mx3.0m culvert at ch.2421m on the same road. (c) Construction of 01 no 2x4.50mx4.50m culvert at ch.3120m on the same road.
|
IRIDP-2
|
agailjhara
|
506024005
|
4.57
|
|
|
264.18
|
MSE-MYT (JV)
|
277.27
|
26/05/2016
|
|
10/03/2018
|
100
|
|
|
31/03/2019
|
|
273
|
IRIDP-2/BRS/DW-76
|
Improvement Of Goila Guptar hat Road N/S - Uttar Shehepasha road ( Revinew office – goilabazar road).(Ch.00m - 1100m)
|
IRIDP-2
|
agailjhara
|
506024027
|
1.10
|
|
|
56.92
|
M/S. Sharif Enterprise
|
59.66
|
20/03/2017
|
|
30/05/2018
|
100
|
|
|
31/03/2019
|
|
274
|
IRIDP-2/BRS/DW-77
|
Improvement Of Rajihar Post office - Bosubari.road .(Ch.00m - 300m)
|
IRIDP-2
|
agailjhara
|
506025083
|
0.30
|
|
|
17.16
|
M/S. Yamin Traders
|
17.99
|
20/03/2017
|
|
28/02/2018
|
100
|
|
|
31/03/2019
|
|
275
|
IRIDP-2/BRS/MW-144
|
Maintenance of Bagdha GC - Shatla GC via Khajuria road (Ch.500m - 2600m) ID NO 506022009
|
IRIDP-2
|
agailjhara
|
506022009
|
2.10
|
|
|
59.64
|
M/S. Shafique Brothers
|
62.59
|
15/10/2017
|
|
30/11/2018
|
100
|
|
|
31/03/2019
|
|
276
|
IRIDP-2/BRS/DW-4
|
a) Improvement of Road from Guptar hat- Jobsen Sehepasha High School road,( Ch. 1650-3500m) b) Improvement of Road from Nuremodina Mosque {Amjad Sarder's bari}-Jobsen GPS road, (Ch. 255-960m) (Guptar hat Jobsen via Uttar Shehepasha High School)
|
IRIDP-2
|
agailjhara
|
|
1.85
|
|
|
120.86
|
M/S. Sharif Enterprise
|
126.81
|
|
11/02/2016
|
10/11/2016
|
100
|
|
|
|
|
277
|
IRIDP-2/BRS/DW-5
|
Improvement of Road from Bagdha GC Amboula Paishar hat GC.00-2220m)
|
IRIDP-2
|
agailjhara
|
|
2.22
|
|
|
153.85
|
M/S. Sharif Enterprise
|
161.44
|
|
07/02/2016
|
06/11/2016
|
100
|
|
|
|
|
278
|
IRIDP-2/BRS/DW-90
|
(a)Improvement of Darogerhat - Musuria senior Madrasha via Musuria Abason Project road (Ch.00m - 4450m)(b) Construction of 02no 2.0mx2.0m culvert at ch.512m & 2025m on the same road.(c)Construction of 02no 1.0mx1.0m culvert at ch.2138m &2755m on the same road.
|
IRIDP-2
|
babuganj
|
506034047
|
4.45
|
|
|
68.53
|
M/S. Talukder Enterprise
|
68.53
|
10/01/2017
|
|
19/02/2019
|
100
|
|
|
03/04/2019
|
|
279
|
IRIDP-2/BRS/DW-91
|
Improvement of Lakutia-Babugonj road (Battola) to Maidaner hat via Secratery janab serajuddin house road (ch..00-254m & 1254m-2240m)
|
IRIDP-2
|
babuganj
|
506034064
|
1.24
|
|
|
70.82
|
Md. Sirajul Islam Hanif
|
63.74
|
02/05/2017
|
|
09/12/2017
|
100
|
|
|
03/04/2019
|
|
280
|
IRIDP-2/BRS/DW-92
|
Construction of 01no 3.60mx3.0m culvert at ch.1320m on Baherchar bazar – baherchar hospital link road infront of uttar baherchar Goni master's house (Baherchar bazar – baherchar hospital)
|
IRIDP-2
|
babuganj
|
506034027
|
|
|
|
10.96
|
M/S. Md. Shamsul Alam
|
8.29
|
25/01/2017
|
|
30/05/2017
|
100
|
|
|
03/04/2019
|
|
281
|
IRIDP-2/BRS/DW-93
|
Improvement of Agorpur UP – Silondia Bazar – Agorur GC road.(Ch.00m - 1830m)
|
IRIDP-2
|
babuganj
|
506033011
|
1.83
|
|
|
102.81
|
M/S. Faruk Enterprise
|
94.56
|
12/01/2017
|
|
28/02/2018
|
100
|
|
|
03/04/2019
|
|
282
|
IRIDP-2/BRS/DW-153
|
(a)Improvement of Chandpsa Sabuz chairman's house Madrasha - Alfaz master's house via Gazipur Bottola road (Ch.00m - 2650m) ID NO 506034112(b)Construction of 05no 1.0mx1.0m culvert at ch.90m,525m,700m,1350m&1610m on the same road.(c)Construction of 01no 2.0mx2.0m culvert at ch.285m on the same road.
|
IRIDP-2
|
babuganj
|
506034112
|
2.65
|
|
|
106.59
|
Md. Sirajul Islam Hanif
|
111.87
|
05/02/2018
|
|
28/12/2018
|
100
|
|
|
03/04/2019
|
|
283
|
IRIDP-2/BRS/DW-206
|
Improvement of RHD Agorpur - tangrakhali bridge road (Ch.00m - 800m) ID NO 506034041
|
IRIDP-2
|
babuganj
|
506034041
|
0.80
|
|
|
50.32
|
M/S.Ma Babar Doa Traders
|
47.80
|
31/07/2018
|
|
25/01/2019
|
100
|
|
|
03/04/2019
|
|
284
|
IRIDP-2/BRS/SDW-220
|
(a)Improvement of RHD Rafiqul Islam khan house - Pangsha Community clinic road (Ch.00m - 1225m) ID NO 506034150(b)Construction of 01no 0.625mx0.60m culvert at ch.805m on the same road.(c)Improvement of Gazalia club-7 Milles RHD.road (Ch.277m - 447m) ID NO 506034036
|
IRIDP-2
|
babuganj
|
506034036
|
1.40
|
|
|
93.74
|
M/S. Nipa Traders
|
89.05
|
25/10/2018
|
|
02/04/2019
|
30
|
|
|
03/04/2019
|
|
285
|
IRIDP-2/BRS/DW-222
|
(a)Improvement of Madhabpasha Gojalia -Mollah Bari - Md.sobhan Mollik(Master)house- East Pangsha GPS.road (Ch.00m - 800m) ID NO 506035104(b)Construction of 02no 1.50mx1.50m culvert at ch.100m,642m on the same road.
|
IRIDP-2
|
babuganj
|
506035104
|
0.80
|
|
|
39.77
|
Md. Asadur Rahman
|
37.78
|
13/02/2019
|
|
20/07/2019
|
20
|
|
|
03/04/2019
|
|
286
|
IRIDP-2/BRS/DW-223
|
Improvement Madhabpasha Mozomderbari - Gudarha kheyaghat -Hadibashkathi road (Ch.500m - 1500m) ID NO 506034157
|
IRIDP-2
|
babuganj
|
506034157
|
1.00
|
|
|
39.50
|
M/S. Sohel Enterprise
|
37.52
|
27/02/2019
|
|
27/08/2019
|
20
|
|
|
03/04/2019
|
|
287
|
IRIDP-2/BRS/SDW-227
|
(a)Improvement Thakur Mallik-Sharikal .road (Ch.00m - 1000m) ID NO 506945017(b)Construction of 01no 3.0mx3.0m culvert at ch.969m on the same road.
|
IRIDP-2
|
babuganj
|
506034003
|
1.00
|
|
|
76.13
|
M/S. H.R Enterprise
|
72.32
|
20/02/2019
|
|
27/11/2019
|
5
|
|
|
03/04/2019
|
|
288
|
IRIDP-2/BRS/RDW-90
|
Improvement of Darogerhat - Musuria senior Madrasha via Musuria Abason Project road (Ch.00m - 4450m)
|
IRIDP-2
|
babuganj
|
506034047
|
|
|
|
193.84
|
|
0.00
|
|
|
|
0
|
|
|
03/04/2019
|
|
289
|
IRIDP-2/BRS/DW-6
|
(a) Improvement of road from Maddhy Kudrokathi Govt. Deghi west side (Bottola) to Sangramer Khal via Professar Golam Hossain house (Ch. 00m-1000m (Maddhy Kudrokathi Govt. Deghi west bank Rahamatpur-Mirgonj road attached Vetenary College) (b) Construction
|
IRIDP-2
|
babuganj
|
|
1.00
|
|
|
47.50
|
Md. Shamsul Alam
|
35.15
|
|
10/03/2016
|
10/12/2016
|
100
|
|
|
|
|
290
|
IRIDP-2/BRS/DW-7
|
(a)Improvement of road Manikkathi RHD Mobarak Hossain Islamia Academy to Amir Mollik's house (Ch. 00-1000m ) (b) Construction of 01no 1.0mx1.0m culvert at ch.360m on the same road.
|
IRIDP-2
|
babuganj
|
|
1.00
|
|
|
46.21
|
Md. Shamsul Alam
|
34.42
|
|
10/03/2016
|
10/12/2016
|
100
|
|
|
|
|
291
|
IRIDP-2/BRS/DW-8
|
(a) Improvement of road from Khodaboxsha Baherchar Adersho High School's from Pucca road to Suzon Ahamad's house by BC (Ch. 00-355m & Ch. 355-500m) (b) Construction of 01no 1.0mx1.0m culvert at ch.5m on the same road.
|
IRIDP-2
|
babuganj
|
|
0.36
|
|
|
21.41
|
M/S. Nazrul Enterprise
|
16.94
|
|
14/03/2016
|
13/08/2016
|
100
|
|
|
|
|
292
|
IRIDP-2/BRS/DW-9
|
(a) Improvement of road from Agorpur UP Office-House of Char Uttar Sabuj via Post Office Culvert, Aziz Master's house (Start Steel Bridge from Ch. 3682m Agorpur-Silondia road towards back ie. Chairman hat)(Thakur Mollik Kabirajbari-Post Office north side
|
IRIDP-2
|
babuganj
|
|
1.87
|
|
|
53.97
|
M/S. Atique Construction
|
46.37
|
|
21/02/2016
|
19/08/2016
|
100
|
|
|
|
|
293
|
IRIDP-2/BRS/DW-132
|
Improvement of Parshibpur-katakhali road (Ch.500m - 1220m) ID NO 506075220
|
IRIDP-2
|
bakerganj
|
506075220
|
0.72
|
|
|
38.94
|
M/S Oshin Enterprise
|
35.05
|
17/09/2017
|
|
30/09/2018
|
100
|
|
|
09/04/2019
|
|
294
|
IRIDP-2/BRS/DW-133
|
Improvement of North Side of Darial Mia Bari to Bangla Bajar foot Bridge Via Char Darial Govt. Pry. School.road (Ch.1425m - 2750m) ID NO 506074033
|
IRIDP-2
|
bakerganj
|
506074033
|
1.33
|
|
|
44.96
|
Md. Khair Hossain
|
42.19
|
18/09/2017
|
|
24/04/2018
|
100
|
|
|
09/04/2019
|
|
295
|
IRIDP-2/BRS/DW-134
|
(a)Improvement of East Krishnonagar khondaker Bari RCC Foot Bridge (UZR) to Bothra Hat via Biharipur Mad rasa Road (Ch.00m - 1018m) ID NO 506074084(b)Construction of 01no 1.6mx1.6 m culvert at ch.793 on the same road.
|
IRIDP-2
|
bakerganj
|
506074084
|
1.02
|
|
|
35.86
|
M/s. Lutfur Kabir
|
34.21
|
12/09/2017
|
|
30/05/2018
|
100
|
|
|
09/04/2019
|
|
296
|
IRIDP-2/BRS/DW-135
|
Improvement of Holta UP Office (Bajar Bridge) to DKP Hat(Balykati Kalitara GPS) via Makimabad Bajar, Dhanshiri Baro Sikder Bari, & Balaikati govt. pry. Schoolroad (Ch.4625m - 5250m) ID NO 506073035
|
IRIDP-2
|
bakerganj
|
506073035
|
0.63
|
|
|
30.24
|
M/S Amir Engineering corporation
|
27.22
|
20/09/2017
|
|
19/04/2018
|
100
|
|
|
09/04/2019
|
|
297
|
IRIDP-2/BRS/DW-136
|
Improvement of North Side Nilganj Khaya Ghat to Char Goma Govt. Pry. School via Faruk Moller Bari (River Side Road)..road (Ch.00m - 1576m) ID NO 506074209
|
IRIDP-2
|
bakerganj
|
506074209
|
1.58
|
|
|
54.83
|
M/S. Apu Enterprise
|
50.99
|
13/12/2017
|
|
10/05/2018
|
100
|
|
|
09/04/2019
|
|
298
|
IRIDP-2/BRS/DW-137
|
Improvement of Krishnokati Jugi Bari Culvcert to Krishnokati High shool via Krishnokati Govt Pry. School,& Nijamkali Khal Foot Bridge.road (Ch.550m - 1480m) ID NO 506074128b)Construction of 01no 3.0mx3.0m culvert at ch.950m on the same road.c)Construction of 01no 1.60mx1.60m culvert at ch.790m on the same road.
|
IRIDP-2
|
bakerganj
|
506074128
|
0.93
|
|
|
53.96
|
Md. Mahafuz Khan
|
48.56
|
13/12/2017
|
|
24/10/2018
|
100
|
|
|
09/04/2019
|
|
299
|
IRIDP-2/BRS/MW-138
|
Maintenance of C&B road - Kaloskati Khayaghat via Munir Bari. (Bharpasa UP Office (Atakati Vangar pool) RHD via Jaynal Member Bari,Jabatunnasa Govt. Pry. School to Samitty Ghar) road (Ch.2300m - 4350m) ID NO 506073033
|
IRIDP-2
|
bakerganj
|
506073033
|
2.05
|
|
|
52.88
|
Md. Mahafuz Khan
|
47.59
|
13/09/2017
|
|
18/12/2018
|
100
|
|
|
09/04/2019
|
|
300
|
IRIDP-2/BRS/DW-188
|
(a)Improvement of Jerail Lunch Ghat - Bhatshala Lunch Ghat via Vosmahal Govt Pry. School road (Ch.657m - 1277m) ID NO 506074107(b)Construction of 01no 0.90mx0.90m culvert at ch.867m on the same road.
|
IRIDP-2
|
bakerganj
|
506074107
|
0.62
|
|
|
25.15
|
M/S. Ferdousi Construction
|
23.89
|
19/07/2018
|
|
30/12/2018
|
100
|
|
|
09/04/2019
|
|
301
|
IRIDP-2/BRS/DW-189
|
Improvement of N/ Side of Kamarkhali GC(Darial Dafader Bari) - Nababer Hat via Bishwas Bari road (Ch.00m - 780m) ID NO 506074202
|
IRIDP-2
|
bakerganj
|
506074202
|
0.78
|
|
|
29.98
|
MS. Haque Traders
|
28.48
|
18/07/2018
|
|
30/11/2018
|
100
|
|
|
09/04/2019
|
|
302
|
IRIDP-2/BRS/DW-193
|
Improvement of E / Side of Gholder Bari (RHD) Sakander Ali Howlader Bari - Charer Bari Via Montaj Mamber Bari road (Ch.150m - 650m) ID NO 506075314
|
IRIDP-2
|
bakerganj
|
506075314
|
0.50
|
|
|
20.37
|
M/S Mother Engineering
|
19.35
|
17/07/2018
|
|
08/01/2019
|
100
|
|
|
09/04/2019
|
|
303
|
IRIDP-2/BRS/DW-198
|
Improvement of Dhudhal madrasha - satraj bazar road (Ch.240m - 1500m) ID NO 506075331
|
IRIDP-2
|
bakerganj
|
506075331
|
1.26
|
|
|
48.05
|
M/S. Sadia Enterprise
|
45.64
|
26/07/2018
|
|
29/10/2018
|
100
|
|
|
09/04/2019
|
|
304
|
IRIDP-2/BRS/DW-201
|
Improvement of Katadia Bus Stand - kanaipura Bajar via katadia Govt. Pry. School road(Ch.450m - 1120m) ID NO 506074134
|
IRIDP-2
|
bakerganj
|
506074134
|
0.67
|
|
|
37.07
|
M/S. Sikder Arian Enterprise
|
35.22
|
30/07/2018
|
|
03/01/2019
|
100
|
|
|
09/04/2019
|
|
305
|
IRIDP-2/BRS/DW-32
|
Improvement of road from Char Darial Ferry Ghat Pucca Road to Char Darial Kheyaghat Bridge via Moti Mastarer Bari, Kamarkhali Bazar Motahar Mastarer Bari (Kamarkhali GC to Chandramohon GC via Nahalgonj Khayghat (Shingerkati {Barisal Sadar} to Kamarkhali Bazar Road {Bakergonj Upazila} at Ch. 3130m-3940m.
|
IRIDP-2
|
bakerganj
|
506072013
|
0.81
|
|
|
42.15
|
M/S. Farid Uddin
|
31.55
|
28/04/2016
|
|
19/11/2016
|
100
|
|
|
09/04/2019
|
|
306
|
IRIDP-2/BRS/DW-104
|
(a)Improvement of Let.Abdul barek Sikdarbarir Infront GPS to faridpur bandar via jahngir sikdar Bari. (Mongolshi H/O Sorab Ali Khan via Faridpur Hat. to Howlader Bari (UJR) Near Janata bazar) road.(Ch.3900m - 4900m)(b)Construction of 01no 0.625mx0.90m culvert at ch.4540m on the same road.
|
IRIDP-2
|
bakerganj
|
506074122
|
1.00
|
|
|
31.40
|
M/S. Hasan Construction
|
29.20
|
20/04/2017
|
|
30/11/2018
|
100
|
|
|
09/04/2019
|
|
307
|
IRIDP-2/BRS/DW-196
|
Improvement of East side of Nimtala station Alom khan police bari - Sarder bari bridge via Mollik bari, Abdur Rashid khan bari ,infornt of Fakirbari road (Ch.00m - 500m) ID NO 506075436
|
IRIDP-2
|
bakerganj
|
506075436
|
0.50
|
|
|
20.39
|
MS Disha Enterprise
|
19.37
|
30/07/2018
|
|
05/02/2019
|
100
|
|
|
09/04/2019
|
|
308
|
IRIDP-2/BRS/DW-197
|
(a)Improvement of Halta UP Office (Kander Barir Foot Bridge)-Ranir Hat via Burir Hat, Caradi Satalite Regd. Pry. School & West Caradi Sikder Bari.road (Ch.00m - 900m) ID NO 506073026(b)Construction of 02no 1.60mx1.60m culvert at ch.540m,690m on the same road.(c)Construction of 01no 0.90mx0.90m culvert at ch.301mon the same road.
|
IRIDP-2
|
bakerganj
|
506073026
|
0.90
|
|
|
41.21
|
M/S. Talukder Construction
|
39.15
|
01/08/2018
|
|
13/01/2019
|
100
|
|
|
09/04/2019
|
|
309
|
IRIDP-2/BRS/DW-200
|
(a)Improvement of Krishnanagar bazar - Sonabaru high School via Jabed Khan Madrasa road (Ch.00m - 380m) ID NO 506074053(b)Construction of 01no 2.0mx2.0m culvert at ch.90m on the same road.(c)Construction of 01no 0.90mx0.90m culvert at ch.333mon the same road.
|
IRIDP-2
|
bakerganj
|
506074053
|
0.38
|
|
|
20.27
|
M/S. Sohel Enterprise
|
19.25
|
23/07/2018
|
|
28/02/2019
|
100
|
|
|
09/04/2019
|
|
310
|
IRIDP-2/BRS/DW-31
|
Improvement of road from Dudal Senior Madrasha to Sarshi Police Fari via Satraj Bazar (Goma Hat {UZR} via Pilkhana GPS, West Dhudal Regd. Primary School Dhudal UP Office, Madal GPS, Chatra Hat & Sarshi GPS to Sharshi Police Camp) at Ch. 3850m-5400m.
|
IRIDP-2
|
bakerganj
|
506073028
|
1.55
|
|
|
39.98
|
M/S. Esad & Emad Enterprise
|
33.44
|
09/05/2016
|
|
02/04/2019
|
70
|
|
|
09/04/2019
|
|
311
|
IRIDP-2/BRS/DW-53
|
(a)Improvement of Ruhul Amin road (Shibghata) to Nilgonj Khayaghat (Kalaskati UP Office (bazar) to Satraj Bazar via Vadarikati Govt. Pry. School, Garuria Bazar, Nilganj Hat , Krishnokati Hi & Goma Shibghata Culvert.) (ch.8435m – 9390m)
|
IRIDP-2
|
bakerganj
|
506073003
|
0.96
|
|
|
52.86
|
M/S. Electro Globe
|
38.63
|
20/04/2016
|
|
30/12/2017
|
60
|
|
|
09/04/2019
|
|
312
|
IRIDP-2/BRS/SDW-185
|
(a)Improvement of Katadia Bus Stand - kanaipura Bajar via katadia Govt. Pry. School road (Ch.1120m - 2500m) ID NO 506074134(b)Construction of 04no 0.90mx0.90m culvert at ch.1610m,2020m,2090m,2420m on the same road.
|
IRIDP-2
|
bakerganj
|
506074134
|
1.38
|
|
|
97.40
|
M/S. Mirza Enterprise
|
92.53
|
18/07/2018
|
|
25/04/2019
|
65
|
|
|
09/04/2019
|
|
313
|
IRIDP-2/BRS/DW-190
|
(a)Improvement of Bander hat-Bhatshala Govt Pry. School via Principal Bari & Sowkath Sannamath Bari road (Ch.00m - 500m) ID NO 506074059(b)Construction of 01no 3.0mx3.0m culvert at ch.91m on the same road.(c)Construction of 02no 0.90mx0.90m culvert at ch.43m,302m on the same road.
|
IRIDP-2
|
bakerganj
|
506074059
|
0.50
|
|
|
29.89
|
M/S. Akon Enterprise
|
28.39
|
18/07/2018
|
|
18/12/2018
|
40
|
|
|
09/04/2019
|
|
314
|
IRIDP-2/BRS/DW-191
|
(a)Improvement of Boalia GC (Bahadurpur Gho Hat) to Bakerganj-Neamati GCCR via Kusangal Hat,Syampur Hat,Botra hat,Kafila Hat & Moller Hat.road (Ch.7228m - 7495m) ID NO 506072011(b)Construction of 01no 3.0mx3.0m culvert at ch.7490m on the same road.
|
IRIDP-2
|
bakerganj
|
506072011
|
0.27
|
|
|
20.01
|
M/S Mother Engineering
|
19.01
|
17/07/2018
|
|
24/12/2018
|
60
|
|
|
09/04/2019
|
|
315
|
IRIDP-2/BRS/DW-192
|
(a)Improvement of Nalua UP Office via Kafilatala High school, Vumi Office - Simultala Bazar.(RHD)road (Ch.900m - 2000m) ID NO 506073048(b)Construction of 01no 2.0mx2.0m culvert at ch.1220m on the same road.
|
IRIDP-2
|
bakerganj
|
506073048
|
1.10
|
|
|
40.06
|
M/S. Sayed Siddiquer Rahman
|
38.06
|
18/07/2018
|
|
25/12/2018
|
0
|
|
|
09/04/2019
|
|
316
|
IRIDP-2/BRS/DW-194
|
(a)Improvement of Kalaskati Khaya Ghat Haji Bari - Ghanddi Achram road (Ch.00m - 760m) ID NO 506075073(b)Construction of 01no 0.90mx0.90m culvert at ch.580m on the same road.
|
IRIDP-2
|
bakerganj
|
506075073
|
0.76
|
|
|
29.99
|
M/S. Sikder Arian Enterprise
|
28.49
|
17/07/2018
|
|
24/12/2018
|
70
|
|
|
09/04/2019
|
|
317
|
IRIDP-2/BRS/DW-195
|
Improvement of Kamarkhali GC - Chandramohon GC via Nahalganj Khaya Ghat.[Shingerkati (Barisal Sadar) - Kamarkhali Bazar Road (Bakerganj Upazila)road (Ch.00m - 450m) ID NO 506072013 2,871,637.00 23-Jul-18 2,728,055.15 30-Jan-19
|
IRIDP-2
|
bakerganj
|
506072013
|
0.45
|
|
|
28.71
|
M/S. H.R Trading
|
27.28
|
23/07/2018
|
|
30/01/2019
|
20
|
|
|
09/04/2019
|
|
318
|
IRIDP-2/BRS/DW-199
|
Improvement of Dhaporkati High School - Kalu khan Bari via Khondoker Bari road (Ch.650m - 1300m) ID NO 506074161
|
IRIDP-2
|
bakerganj
|
506074161
|
0.65
|
|
|
25.00
|
M/S. MA Enterprise
|
23.75
|
24/07/2018
|
|
24/07/2018
|
90
|
|
|
09/04/2019
|
|
319
|
IRIDP-2/BRS/DW-202
|
(a)Improvement of Boro Ragunathpur Ahamad's hat - chairman hat.road (Ch.00m - 800m) ID NO 506075301(b)Construction of 01no 0.90mx0.90m culvert at ch.630m on the same road.
|
IRIDP-2
|
bakerganj
|
506075301
|
0.80
|
|
|
30.25
|
MS. Doel Enterprise
|
28.74
|
23/07/2018
|
|
30/12/2018
|
80
|
|
|
09/04/2019
|
|
320
|
IRIDP-2/BRS/DW-203
|
(a)Improvement of Niamoti pucca bridge - chanta nutan hat road (Ch.00m - 730m) ID NO 506075246(b)Construction of 01no 1.60mx1.60m culvert at ch.415m on the same road.(c)Construction of 02no 0.90mx0.90m culvert at ch.337m,710m on the same road.
|
IRIDP-2
|
bakerganj
|
506075246
|
0.73
|
|
|
34.97
|
Progati Traders
|
33.22
|
24/07/2018
|
|
01/02/2019
|
0
|
|
|
09/04/2019
|
|
321
|
IRIDP-2/BRS/DW-204
|
(a)Improvement of Barisal - Patuakhali RHD - Baherchar GC Kalaskati Hat, Chairman Hat & Kastoganj road (Ch.11170m -11830m) ID NO 506072010(b)Construction of 01no 3.0mx3.0m culvert at ch.11450m on the same road.(c)Construction of 01no 1.00mx1.00m culvert at ch.11171m on the same road. 3,604,206.00 1-Aug-18 3,423,995.70 7-Feb-19
|
IRIDP-2
|
bakerganj
|
506072010
|
0.66
|
|
|
36.04
|
M/S. Jabana Enterprise
|
34.23
|
01/08/2018
|
|
07/02/2019
|
20
|
|
|
09/04/2019
|
|
322
|
IRIDP-2/BRS/DW-205
|
Improvement of Kalaskati UP Office(Bajar) - Laxmipasa Hat t via Kumar bari bridge, Ammtali ghat & Sadish Govt. Pry. School.road(Ch.800m - 1250m) ID NO 506073021 2,852,152.00 1-Aug-18 2,709,544.40 8-Feb-19
|
IRIDP-2
|
bakerganj
|
506073021
|
0.45
|
|
|
28.52
|
M/S. R.S Construction
|
27.09
|
01/08/2018
|
|
28/02/2019
|
45
|
|
|
09/04/2019
|
|
323
|
IRIDP-2/BRS/DW-229
|
Improvement Nalua UP Office via Afalkati Clinic east char Gojalia regd pry school & Nabankhali Bazar to old Mallik Hat(afalkati Lunch Ghat)(Ch.1500m - 1960m) ID NO 506073039 Link. Aziz Mollah bari Panjegana Mosque to Dewli 110.0m
|
IRIDP-2
|
bakerganj
|
506073039
|
0.57
|
|
|
24.89
|
Md. Anwar Hossain Howlader
|
23.64
|
11/02/2019
|
|
18/07/2019
|
0
|
|
|
09/04/2019
|
|
324
|
IRIDP-2/BRS/DW-99
|
Improvement of Shialghuni Bazar-DC Road-Foraji bari-Chunakhali High School-Kobai Bazar road (ch. 1400m-3400m)
|
IRIDP-2
|
bakerganj
|
506074123
|
2.00
|
|
|
51.80
|
|
0.00
|
|
|
|
0
|
|
|
09/04/2019
|
|
325
|
IRIDP-2/BRS/DW-20
|
(a)Improvement of road from North Krishnokati GPS - Krishnokati High School via Chowdhuri bari - Siraj Khan Master Bari (Krishnokati Jugi Bari Culver to Krishnokati High School via Krishnokati GPS & Nijamkali Khal Foot Bridge at Ch. 729m-1889m b) Construction of 01no 1.0mx1.0m culvert at ch.828m on the same road.
|
IRIDP-2
|
bakerganj
|
506074128
|
1.16
|
|
|
34.79
|
Md. Zakir Hossain Mia
|
34.92
|
29/06/2016
|
|
28/02/2018
|
100
|
|
|
08/04/2019
|
|
326
|
IRIDP-2/BRS/DW-21
|
(a)Improvement of road from C&B road - Kaloskati Khayghat road via monir bari (kaleshkati UP office (Vumi Office) - Kaligonj Bazar Bridge via Kalaskati Khayaghat Battala (RHD), Talukder Bari & Asmath Ali Khan (Chowdhury Bari) at Ch. 1450m-2179m b) Construction of 01no 3.0mx3.0m culvert at ch.1889m on the same road.
|
IRIDP-2
|
bakerganj
|
506073002
|
0.73
|
|
|
26.54
|
M/S. Nibir Traders
|
19.93
|
26/04/2016
|
|
06/08/2016
|
100
|
|
|
08/04/2019
|
|
327
|
IRIDP-2/BRS/DW-22
|
Improvement of road from kanki Bazar Bridge - nurnagar Bazar via Amena Khatun Junior High School (Kanki Bazar to Middle Mahespur Hat via Durgapur & Nurnagar Hat) at Ch. 600m-1680m.
|
IRIDP-2
|
bakerganj
|
506074106
|
1.08
|
|
|
29.97
|
M/S. Apu Enterprise
|
28.16
|
30/06/2016
|
|
06/08/2016
|
100
|
|
|
08/04/2019
|
|
328
|
IRIDP-2/BRS/DW-23
|
Improvement of road from back side of Nowroj Mia's house - Bangla Bazar via Durgapur GPS & Laxmighar (Padrisibpur UP Office to Bangla Bazar Sluice gate via Puiauta Junior High School) at Ch. 1867m-2817m
|
IRIDP-2
|
bakerganj
|
506073007
|
0.95
|
|
|
24.55
|
Md. Zakir Hossain Mia
|
25.74
|
29/06/2016
|
|
30/12/2017
|
100
|
|
|
08/04/2019
|
|
329
|
IRIDP-2/BRS/DW-24
|
Improvement of Ragunathpur Go-hat (Kajir hat) - Katuajhuri Khal, (506074246 Upazila Border) at Ch. 00m-400m.
|
IRIDP-2
|
bakerganj
|
506074246
|
0.40
|
|
|
10.34
|
Md. Zakir Hossain Mia
|
10.83
|
29/06/2016
|
|
22/08/2016
|
100
|
|
|
08/04/2019
|
|
330
|
IRIDP-2/BRS/DW-25
|
(a)Improvement of road from Sattar Mridha Bari - Torab Ali Bhuyan Bari via Esahak Howlader Bari & Gazi Kalu Mosque at Ch. 00m-700m. b) Construction of 01no 4.0mx4.0m culvert at ch.660m on the same road.
|
IRIDP-2
|
bakerganj
|
506075425
|
0.70
|
|
|
29.12
|
M/S. Farid Uddin
|
24.85
|
28/04/2016
|
|
30/04/2018
|
100
|
|
|
08/04/2019
|
|
331
|
IRIDP-2/BRS/DW-26
|
(a)Improvement of road from Hasem Chairman Bari - Madariar par via Jahangir Khondokar Bari (East side of Hasem Chairman (old) Bari via Kadaria Madrasha, Saympur Kadaria Govt. Primary School, Ansan Member & Masum to Saympur Basabari Bridge) at Ch. 00m-1000m b) Construction of 01no 2.0mx2.0m culvert at ch.445m on the same road. c) Construction of 01no 1.60mx1.60m culvert at ch.880m on the same road.
|
IRIDP-2
|
bakerganj
|
506074229
|
1.00
|
|
|
33.46
|
M/S. Farid Uddin
|
28.73
|
28/04/2016
|
|
02/06/2018
|
100
|
|
|
08/04/2019
|
|
332
|
IRIDP-2/BRS/DW-27
|
Improvement of road from Robipur D.C Road near Aziz Howlader Shop - Anondo Dhopa Bari (Ward No.02) ( Khairabad hat {Garuria UP Office} to Daporkati Bazar (Godown) via Nilganj Hat, Rabipur GPS (Pearpur Bridge) at Ch.6000m-7435m.
|
IRIDP-2
|
bakerganj
|
506073001
|
1.44
|
|
|
36.94
|
M/S. Apu Enterprise
|
31.35
|
08/05/2016
|
|
30/09/2016
|
100
|
|
|
08/04/2019
|
|
333
|
IRIDP-2/BRS/DW-28
|
Improvement of road from Abu Sharif house - Bangla Bazar via Lal Sharif house (Kafila Makbul Mira Bari Girder Bridge to Kafila Bazar Saw Mill via Kafila Salehia Khatun Junior High School) at Ch. 00m-1380m.
|
IRIDP-2
|
bakerganj
|
506074181
|
1.38
|
|
|
38.41
|
Md. Zakir Hossain Mia
|
34.37
|
01/08/2016
|
|
28/07/2018
|
100
|
|
|
08/04/2019
|
|
334
|
IRIDP-2/BRS/DW-29
|
(a)Improvement of road from Kabai Union Islamia College - Hanua Motizan High School via South way Isahak Member bari (Hanua UP Office Bridge to Sarder Bari Foot Bridge via Jainpuri Khanka Sarif Bari ) at Ch. 00m-710m b) Construction of 01no 1.60mx1.60m culvert at ch.210m on the same road.
|
IRIDP-2
|
bakerganj
|
506074199
|
0.71
|
|
|
21.57
|
M/S. Esad & Emad Enterprise
|
17.76
|
09/05/2016
|
|
26/06/2016
|
100
|
|
|
08/04/2019
|
|
335
|
IRIDP-2/BRS/DW-30
|
Improvement of Mokimabad Atahar Uddin Degree College - Dakhin Balalkati Kalitara GPS via Abdul Kader Howlader Bari (Halta UP Office {Bazar} to DKP Hat {Balaykati Kalitara GPS) via Makimabad Bazar, Dhanshiri Baro Sikder Bari, & Balaikati GPS at Ch. 3800m-4625m.
|
IRIDP-2
|
bakerganj
|
506073035
|
0.83
|
|
|
37.76
|
M/S. Saad Construction
|
27.92
|
12/05/2016
|
|
29/11/2016
|
100
|
|
|
08/04/2019
|
|
336
|
IRIDP-2/BRS/DW-33
|
Improvement of road from Banglabazar - Biharipur Hossainia Alim Madrasha via Abul Daroga Bari (East side of Bangla Bazar Box Culvert to Wapdder Khal Ghorar Bridge {Bothra} via Biharipur Madrasha) at Ch. 00m-775m.
|
IRIDP-2
|
bakerganj
|
506074182
|
0.78
|
|
|
19.99
|
Md. Zakir Hossain Mia
|
17.99
|
01/08/2016
|
|
30/11/2017
|
100
|
|
|
08/04/2019
|
|
337
|
IRIDP-2/BRS/DW-98
|
Improvement of Beltola bridge - Bhabanipur Bazar via Aribaki GPS. (Rangashiree UP Office (Baltala Bridge) via Araibagi G. P.S, Bhabanipur G. P.S. School, Karitas Bridge & Gandu Master Bari to Durgapur Sluice Bazar.) road (Ch.00m - 1500m)
|
IRIDP-2
|
bakerganj
|
506073043
|
1.50
|
|
|
39.43
|
M/S. Esad & Emad Enterprise
|
34.01
|
20/02/2017
|
|
18/06/2017
|
100
|
|
|
08/04/2019
|
|
338
|
IRIDP-2/BRS/DW-100
|
(a)Improvement of Bhorpasha UP Office to Narangol Khayaghat via Dhudal mow bazar side very (Naragal Khaya Ghat Via Krishnokati Jalil Akon Bari.) (ch. 00-1280m)(b) Construction of 01no 1.0mx1.0m culvert at ch.256m on the same road
|
IRIDP-2
|
bakerganj
|
506074091
|
1.28
|
|
|
38.18
|
M/S. Apu Enterprise
|
32.35
|
19/02/2017
|
|
14/06/2017
|
100
|
|
|
08/04/2019
|
|
339
|
IRIDP-2/BRS/DW-101
|
(a)Improvement of C &B Bhanga pool – Khezura khalgora via md.Joynal Member & Jabbair sikder Bari.(Bharpasa UP Office (Atakati Vangar pool) RHD via Jaynal Member Bari,Jabatunnasa Govt. Pry. School to Samitty Ghar) road.(Ch.00m - 1712m)(b) Construction of 01no 3.0mx3.0m culvert at ch.1062m on the same road
|
IRIDP-2
|
bakerganj
|
506073033
|
1.71
|
|
|
55.53
|
Md. Jamal Sarder
|
46.09
|
12/02/2017
|
|
27/02/2018
|
100
|
|
|
08/04/2019
|
|
340
|
IRIDP-2/BRS/DW-102
|
(a)Improvement of Balai kati Uttampur kheya ghat – Abdur Rob mollar bari via DKP kheya ghat (Halta Board Govt. Pry. School to Khipaituler Hat.). road.(Ch.3711m - 5020m)(b)Construction of 01no 1.60mx1.60m culvert at ch.5006m on the same road.
|
IRIDP-2
|
bakerganj
|
506074184
|
1.31
|
|
|
40.00
|
Anukul Chandra Sarkar
|
33.09
|
02/03/2017
|
|
07/06/2018
|
100
|
|
|
08/04/2019
|
|
341
|
IRIDP-2/BRS/DW-103
|
Improvement of Garuria GPS to Dighir par GPS. (Khayrabad Makbul sikder Bari (Justice) to Garuria Govt. Pry. School Via Digir par Govt. Pry. School & lahajuddin howlader Barir Foot Bridge.)road.(Ch00m -1440m)
|
IRIDP-2
|
bakerganj
|
506075273
|
1.44
|
|
|
39.96
|
M/S. Sayed Siddiquer Rahman
|
34.66
|
05/03/2017
|
|
27/07/2018
|
100
|
|
|
08/04/2019
|
|
342
|
IRIDP-2/BRS/DW-105
|
Improvement of fridpur union vhumi office - hemayet ponditer bari via Khn barir zame mosque. (Faripur hat-kakorda road-east site & Rustom gaji.) road.(Ch.00m - 1400m)
|
IRIDP-2
|
bakerganj
|
506075389
|
1.40
|
|
|
39.77
|
M/S. Hasan Construction
|
36.48
|
01/03/2017
|
|
24/06/2018
|
100
|
|
|
08/04/2019
|
|
343
|
IRIDP-2/BRS/DW-106
|
Improvement of Zirail Mojumdar Barir South side pucca road - Alauddin talukdarer bridge via madrasa atim khana,durgapasa zirail high school. (Bander Hat to Jirail Ajijia madrasa) road.(Ch.800m - 2300m)
|
IRIDP-2
|
bakerganj
|
506074064
|
1.50
|
|
|
40.90
|
M/S. Hasan Construction
|
36.73
|
30/03/2017
|
|
02/05/2018
|
100
|
|
|
08/04/2019
|
|
344
|
IRIDP-2/BRS/DW-107
|
Improvement of Hiradhar Bazar - Dewli Azizul haque Mollar Bari via sarot sreetiGPS. (West Side of Dauli Jalil Khan Bari (UZR) via sharoth Shirity Govt. Pry. School. to Kharabad Makbul Sikder Bari.) road.(Ch.975m - 2140m)
|
IRIDP-2
|
bakerganj
|
506074174
|
1.17
|
|
|
29.99
|
M/S. Sayed Siddiquer Rahman
|
26.01
|
05/03/2017
|
|
15/06/2017
|
100
|
|
|
08/04/2019
|
|
345
|
IRIDP-2/BRS/DW-108
|
(a)Improvement of Meur pucca road attached Salamer mill - Aziz mastarer bari. (Garuria Mayur(sawmill) to Dawli GPS(Dighirpar) road.(Ch.00m - 1260m)(b)Construction of 02no 1.0mx1.0 m culvert at ch.625m & 1255m on the same road.
|
IRIDP-2
|
bakerganj
|
506074248
|
1.26
|
|
|
42.49
|
M/S. Hasan Construction
|
39.92
|
20/02/2017
|
|
26/09/2018
|
100
|
|
|
08/04/2019
|
|
346
|
IRIDP-2/BRS/DW-109
|
(a)Improvement of Ruhul Amin road – Shatar bazar via Kalikola, Sialguni kundar hat bridge road.(Ch.00m - 592m)(b)Construction of 01no 2x4.0mx4.0 m culvert at ch.141m on the same road.
|
IRIDP-2
|
bakerganj
|
506074095
|
0.59
|
|
|
32.87
|
M/S. Nibir Traders
|
29.58
|
11/01/2017
|
|
16/04/2017
|
100
|
|
|
08/04/2019
|
|
347
|
IRIDP-2/BRS/DW-128
|
Improvement of Kabai UP office via Kabai Bazar (Islamia College) to Molla bari (Bazar RHHD).( Kabai union Islamia college via Hanua mortijan high school – Khodabox khati Ishaq member bari)road (Ch.00m - 2000m) ID NO 506073014
|
IRIDP-2
|
bakerganj
|
506073014
|
2.00
|
|
|
67.27
|
M/s. Lutfur Kabir
|
63.56
|
18/09/2017
|
|
30/03/2018
|
100
|
|
|
08/04/2019
|
|
348
|
IRIDP-2/BRS/DW-129
|
Improvement of Sealghuni bazar - Kabai Hat via East shialguni Govt. Pry. .School, kastoganj Sluice Get, & Kabai Govt. Pry. School..road (Ch.1300m - 2300m) ID NO 506074079
|
IRIDP-2
|
bakerganj
|
506074079
|
1.00
|
|
|
63.74
|
M/S. Abul Kalam Azad
|
57.37
|
10/09/2017
|
|
05/05/2018
|
100
|
|
|
08/04/2019
|
|
349
|
IRIDP-2/BRS/DW-130
|
(a)Improvement of Masuakhali Khaya Ghat (UJR) – Moller hat via Masuakhali high School.road (Ch.00m – 850m) ID NO 506514211b)Construction of 01no 2.0mx2.0m culvert at ch.168m on the same road.
|
IRIDP-2
|
bakerganj
|
506074211
|
0.85
|
|
|
37.04
|
M/S Nahid Enterprise
|
33.33
|
14/09/2017
|
|
30/07/2018
|
100
|
|
|
08/04/2019
|
|
350
|
IRIDP-2/BRS/DW-131
|
(a) Improvement of Padrisibpurp U.P office - Bangla Bajar Sluice Get via Puiauta Junior High School. Road (Ch.5400m - 6200m) ID NO 506073007(b)Construction of 01no 3.0mx3.0 m culvert at ch.5538mon the same road.(c)Construction of 01no 2.0mx2.0 m culvert at ch.6045mon the same road.(d)Construction of 01no 0.625mx0.60m culvert at ch.5450m on the same road.
|
IRIDP-2
|
bakerganj
|
506073007
|
0.80
|
|
|
45.24
|
M/S Amir Engineering corporation
|
40.71
|
20/09/2017
|
|
13/01/2019
|
100
|
|
|
08/04/2019
|
|
351
|
IRIDP-2/BRS/DW-132
|
Improvement of Parshibpur-katakhali road (Ch.500m - 1220m) ID NO 506075220
|
IRIDP-2
|
bakerganj
|
506075220
|
0.72
|
|
|
38.94
|
M/S Oshin Enterprise
|
35.05
|
12/09/2017
|
|
30/09/2018
|
100
|
|
|
08/04/2019
|
|
352
|
IRIDP-2/BRS/DW-178
|
(a) Improvement of UZR(Nanduhar Bridge)-Udoykati UPC road (Ch.00m - 1400m) ID NO 506105084(b)Construction of 01no 3.0mx3.0m culvert at ch.188m on the same road.(c)Construction of 02no 2.0mx2.0m culvert at ch.366m, 520 on the same road.(d)Construction of 04no 0.625mx0.60m culvert at ch.586m,740m,825m,886m on the same road.
|
IRIDP-2
|
banaripara
|
506105084
|
1.40
|
|
|
103.44
|
M.M. Builders & Engineers LTD.
|
93.09
|
26/12/2017
|
|
18/02/2019
|
60
|
|
|
03/04/2019
|
|
353
|
IRIDP-2/BRS/DW-182
|
(a)Improvement of Alta Sikderbari-Sanker Sikder House Via Norerkati road (Ch.1519m - 2244m) ID NO 506104027(b)Construction of 04no 4.0mx4.0m culvert at ch.221m,1223m,1710m,2234m on the same road.(c)Construction of 01no 3.0mx3.0m culvert at ch.1802m on the same road.(d)Construction of 04no 2.0mx2.0m culvert at ch.526m,593m,684m,1600m on the same road.(d)Construction of 03no 0.625mx0.60m culvert at ch.93m,100m,1112m on the same road.
|
IRIDP-2
|
banaripara
|
506104027
|
0.72
|
|
|
124.20
|
Md. Mahafuz Khan
|
111.78
|
16/04/2018
|
|
23/04/2019
|
30
|
|
|
03/04/2019
|
|
354
|
IRIDP-2/BRS/DW-216
|
(a)Improvement of Baisari Dak Bangla-Kachua Madrasha Road .(Ch.1955m - 2765m) ID NO 506104033(b)Construction of 01no 0.625mx0.60m culvert at ch.2141m on the same road.(c)Construction of 01no 1.0mx1.0m culvert at ch.2294m on the same road.(d)Construction of 01no 2.0mx2.0m culvert at ch.2415m on the same road.
|
IRIDP-2
|
banaripara
|
506104033
|
0.81
|
|
|
64.05
|
M/S. Ma Babar Doa Traders
|
60.84
|
30/09/2018
|
|
07/07/2019
|
50
|
|
|
03/04/2019
|
|
355
|
IRIDP-2/BRS/DW-217
|
(a)Improvement of Udaykati union border - bokshobari jume masque - north tetla RNGPS Road .(Ch.00m - 850m) ID NO 506105089(b)Construction of 01no 0.625mx0.60m culvert at ch.346m on the same road.(c)Construction of 02no 1.0mx1.0m culvert at ch.605m,817m on the same road.(d)Construction of 02no 3.0mx3.0m culvert at ch.471m,854m on the same road.(e)Construction of 01no 4.0mx4.0m culvert at ch.290m on the same road.
|
IRIDP-2
|
banaripara
|
506105089
|
0.85
|
|
|
95.06
|
M/S. Ashraf Builders
|
90.30
|
16/09/2018
|
|
23/07/2019
|
40
|
|
|
03/04/2019
|
|
356
|
IRIDP-2/BRS/DW-218
|
(a)Improvement of Boro Chowlakati Talukder Bari Jam-E-Mosque-Jangalia H/S Road .(Ch.00m - 1060m) ID NO 506104081 and Link-250m(b)Construction of 02no 1.30mx1.30m culvert at ch.350m,850m on the same road.(c)Construction of 01no 3.0mx3.0m culvert at ch.545m on the same road.(d)Construction of 01no 4.50mx4.50m culvert at ch.3430m on Sayedkati UPC-Baisari Bazar Road.ID NO 5061043022
|
IRIDP-2
|
banaripara
|
506103022
|
1.31
|
|
|
102.89
|
M/S. Sagar Enterprise
|
102.89
|
04/10/2018
|
|
11/09/2019
|
55
|
|
|
03/04/2019
|
|
357
|
IRIDP-2/BRS/DW-219
|
Improvement of Masrong RHD-Nazirpur Road via H/O Shaajahan Chokder Road .(Ch.820m - 1320m) ID NO 506104059
|
IRIDP-2
|
banaripara
|
506104059
|
0.50
|
|
|
31.92
|
M/S. Mitro & Co.
|
30.32
|
01/10/2018
|
|
08/04/2019
|
60
|
|
|
03/04/2019
|
|
358
|
IRIDP-2/BRS/MW-177
|
(a) Maintenance of Baisari Dak Bangla-Kachua Madrasha. road (Ch.00m - 1955m) ID NO (b)Construction of 04no 0.625mx0.60m culvert at ch.42m,137m,1249m & 1730m on the same road. 506104033
|
IRIDP-2
|
banaripara
|
506104033
|
1.96
|
|
|
42.50
|
M/S Amir Engineering corporation
|
38.25
|
04/01/2018
|
|
30/08/2018
|
100
|
|
|
02/04/2019
|
|
359
|
IRIDP-2/BRS/DW-175
|
(a)Improvement of Boro Baithsar GPS - Darikar Mohila Madrasha road (Ch.786m - 1255m) ID NO 506104048(b)Construction of 01no 0.625mx0.60m culvert at ch.1113m on the same road.
|
IRIDP-2
|
banaripara
|
506104048
|
0.47
|
|
|
30.02
|
M/S. Abul Kalam Azad
|
27.89
|
24/12/2017
|
|
30/11/2018
|
100
|
|
|
02/04/2019
|
|
360
|
IRIDP-2/BRS/DW-87
|
(a)Improvement of Royarhat Bridge (East side) - Jhalokati Border Via Gava H/School road(Ch.00m - 1000m) (b) Construction of 03no 0.625mx0.60m culvert at ch.30m,300m&500m on the same road.
|
IRIDP-2
|
banaripara
|
506105060
|
1.00
|
|
|
61.55
|
M/S. Mitro & Co.
|
46.36
|
06/03/2017
|
|
30/12/2018
|
80
|
|
|
02/04/2019
|
|
361
|
IRIDP-2/BRS/DW-88
|
(a)Improvement of Elluhar UPC - Chander hat road(Ch.00m - 1321m) (b) Construction of 03no 3.0mx3.0m culvert at ch.200m,617m&754m on the same road.(c)Construction of 01no 1.0mx1.0m culvert at ch.520m on the same road. (d)Construction of 02no 0.625mx0.60m culvert at ch.450m&845m on the same road.
|
IRIDP-2
|
banaripara
|
506103003
|
1.32
|
|
|
102.82
|
M/S. M.T Builders
|
79.93
|
06/03/2017
|
|
30/03/2019
|
75
|
|
|
02/04/2019
|
|
362
|
IRIDP-2/BRS/DW-89
|
(a)Improvement of Masrong RHD - Alta Nesaria Madrasha road(Ch.00m - 1700m) (b) Construction of 01no 2.0mx2.0m culvert at ch.1400m on the same road.(c)Construction of 01no 4.0mx4.0m culvert at ch.1278m on the same road.(d)Construction of 01no 0.625mx0.60m culvert at ch.520m on the same road.
|
IRIDP-2
|
banaripara
|
506105053
|
1.70
|
|
|
113.87
|
M/S. Talukder Enterprise
|
85.97
|
06/03/2017
|
|
28/08/2018
|
80
|
|
|
02/04/2019
|
|
363
|
IRIDP-2/BRS/SDW-160
|
(a) Improvement of Khodaboxsha GPS to Paschim Chakhar GPS via H/O Aneyt Member, Goailbari Comunity school, H/O A Rob Chowkider BC road (Ch. 500m-1150m)b) Construction of 1No 2.00mx2.0m Culvert at Ch. 764 on the Same Road. c) Construction of 1No 1.0mmx1.0m Culvert at Ch. 811 on the Same Road. d) Improvement of Chakhar bazar-Kalir bazar Via Goterer bari road (Ch. 400m-900m)
|
IRIDP-2
|
banaripara
|
506104030
|
1.15
|
|
|
78.20
|
PTSL-MAITREE (PVT) LTD
|
70.38
|
28/09/2017
|
|
28/11/2018
|
75
|
|
|
02/04/2019
|
|
364
|
IRIDP-2/BRS/MW-176
|
(a) Maintenance of Bangla Bazar-Zirarkati road (Ch.872m - 3720m) ID NO 506104038(b)Construction of 05no 0.625mx0.60m culvert at ch.1608m,1760m, 1895m, 2240m,3224m on the same road.(c)Construction of 01no 2.0mx2.0m culvert at ch.2370m on the same road.
|
IRIDP-2
|
banaripara
|
506104038
|
2.85
|
|
|
69.53
|
M/S. Kohinoor Enterprise
|
62.57
|
01/01/2018
|
|
08/11/2018
|
80
|
|
|
02/04/2019
|
|
365
|
IRIDP-2/BRS/DW-12
|
(a) Improvement of road from Baisary UPC to Uttar Nazirpur Dhanhat Road (Dandowat to Baisari Dhakbanglo road via Bauser hat UP. (Proposed Ch. 00m-720m) (b) Construction of 01no 0.625mx0.6m culvert at ch.655m on the same road. (c) Construction of 01no 2.0m
|
IRIDP-2
|
banaripara
|
|
0.72
|
|
|
47.69
|
M/S. Esad & Emad Enterprise
|
35.68
|
|
10/04/2016
|
30/12/2017
|
100
|
|
|
|
|
366
|
IRIDP-2/BRS/DW-13
|
Improvement of road from Laskarpur to Mirerhat via Uddan Madrasha (Proposed Ch.500m-1020m)
|
IRIDP-2
|
banaripara
|
|
0.52
|
|
|
29.82
|
M/S. Farid Uddin
|
23.22
|
|
14/04/2016
|
10/10/2017
|
100
|
|
|
|
|
367
|
IRIDP-2/BRS/DW-14
|
Improvement of road from Khodaboxsha GPS to Paschim Chakhar GPS via H/O Aneyet Member, Goailbari Community School, H/O A Rob Chowkider BC Road (Ch. 752 m-1300 m)
|
IRIDP-2
|
banaripara
|
|
0.55
|
|
|
33.03
|
M/S. Esad & Emad Enterprise
|
24.71
|
|
10/04/2016
|
30/12/2016
|
100
|
|
|
|
|
368
|
IRIDP-2/BRS/MW-52
|
(a)Maintenance of Jagua Mollar Dokan - Amir Hossain house nearTaher Ali Bari-Panchgaon Bazar Road (Ch.00m - 2000m) (b) Construction of 01 no 1.60mx1.60m culvert at ch.1994 on the same road.
|
IRIDP-2
|
barishal-s
|
506514124
|
2.00
|
|
|
37.81
|
M/S. Electro Globe
|
27.61
|
20/04/2016
|
|
06/08/2016
|
100
|
|
|
08/04/2019
|
|
369
|
IRIDP-2/BRS/DW-114
|
Improvement of Jagua Union Parishad - Karapur Steel Bridge - Bousherhat GC road (Ch.3766m - 4905m)
|
IRIDP-2
|
barishal-s
|
506513012
|
1.14
|
|
|
59.25
|
M/S. Serajul Alam Sikder
|
56.97
|
22/05/2017
|
|
11/03/2019
|
100
|
|
|
08/04/2019
|
|
370
|
IRIDP-2/BRS/DW-115
|
(a)Improvement of Bousher Hat - Madha Karappur GPS road (Ch.00m - 1355m)(b)Construction of 02no 1.6mx1.6 m culvert at ch.804m &1130 on the same road.
|
IRIDP-2
|
barishal-s
|
506515092
|
1.36
|
|
|
83.84
|
Orient Trading & Builders LTD.
|
75.45
|
07/06/2017
|
|
30/11/2018
|
100
|
|
|
08/04/2019
|
|
371
|
IRIDP-2/BRS/DW-116
|
(a)Improvement of Chandpura Kerani Bari Pol-Chandpura Maksuda Member Bari River Side Via Mazid How. Hat road (Ch.00m - 1496m)(b)Construction of 02no 1.0mx1.0 m culvert at ch.300m&547m on the same road.(c)Construction of 02no 1.60mx1.0m culvert at ch.792m&1056m on the same road.
|
IRIDP-2
|
barishal-s
|
506514094
|
1.50
|
|
|
93.48
|
Orient Trading & Builders LTD.
|
84.13
|
01/06/2017
|
|
10/01/2019
|
100
|
|
|
08/04/2019
|
|
372
|
IRIDP-2/BRS/DW-117
|
Construction of 02no 1.6mx1.6 m culvert at ch.67.0m & 135m Jagua Sher-E-Bangla Hat-Jashim Uddin Talukder House.road
|
IRIDP-2
|
barishal-s
|
506514118
|
|
|
|
6.50
|
M/S. Santu Traders
|
6.50
|
10/08/2017
|
|
30/05/2018
|
100
|
|
|
08/04/2019
|
|
373
|
IRIDP-2/BRS/DW-118
|
Improvement of Ramkati-Ramkati Bazar Via Panbaria Adarsha Gram & Panbaria Madrasha.road (Ch.1090m - 3126m) ID NO 506514013
|
IRIDP-2
|
barishal-s
|
506514013
|
2.04
|
|
|
59.81
|
M/S. Rupali Construction
|
62.79
|
10/08/2017
|
|
30/11/2018
|
100
|
|
|
08/04/2019
|
|
374
|
IRIDP-2/BRS/DW-122
|
(a)Improvement of Raipasha H/S-kulakana Son Field Via Fakir Hat road (Ch.00m - 1310m) ID NO 506514003(b)Construction of 03no 2.0mx2.0 m culvert at ch.350m,598m&873m on the same road.(c)Construction of 02no 1.00mx1.00m culvert at ch.652m&798m on the same road. 10,226,139.04 10-Aug-17 9,203,525.12
|
IRIDP-2
|
barishal-s
|
506514003
|
1.31
|
|
|
102.26
|
M/S. Mohiuddin Ahmed
|
92.03
|
10/08/2017
|
|
28/02/2019
|
100
|
|
|
08/04/2019
|
|
375
|
IRIDP-2/BRS/DW-124
|
(a)Improvement of Taltoli Bazar-Lamchari hat road (Ch.5000m - 6700m) ID NO 506514139(b)Construction of 01no 2x4.0mx4.0m culvert at ch.5550m on the same road.(c)Construction of 03no 1.60mx1.60m culvert at ch.5565m,6203m&6688m on the same road.
|
IRIDP-2
|
barishal-s
|
506514139
|
1.70
|
|
|
140.04
|
M/S. Mohiuddin Ahmed
|
126.03
|
10/08/2017
|
|
15/01/2019
|
100
|
|
|
08/04/2019
|
|
376
|
IRIDP-2/BRS/DW-44
|
Improvement of Charbaria Gilatoli Kheyaghat – End of Natunchar Via Natunchar GPS road (Ch.0.00m-1600m) 6,991,508.00 20-Apr-16 5,133,816.96
|
IRIDP-2
|
barishal-s
|
506515073
|
1.60
|
|
|
69.91
|
M/S. Electro Globe
|
51.33
|
20/04/2016
|
|
30/12/2017
|
45
|
|
|
08/04/2019
|
|
377
|
IRIDP-2/BRS/DW-45
|
Improvement of Nehalganjhat - Baroikandi road (ch.00m-1100m)
|
IRIDP-2
|
barishal-s
|
506515036
|
1.10
|
|
|
50.94
|
M/S. Electro Globe
|
37.18
|
20/04/2016
|
|
30/12/2017
|
75
|
|
|
08/04/2019
|
|
378
|
IRIDP-2/BRS/DW-47
|
(a)Improvement of Jagua Hogla H/S - Najor Ali Chaprashi Bari Via Mohammad Ali H/S road (ch.650m-1650m) (b) Construction of 01no 1.60mx1.60m culvert atch.1130 m on the same road.
|
IRIDP-2
|
barishal-s
|
506514117
|
1.00
|
|
|
49.50
|
M/S. Electro Globe
|
36.37
|
20/04/2016
|
|
30/12/2017
|
35
|
|
|
08/04/2019
|
|
379
|
IRIDP-2/BRS/DW-48
|
(a)Improvement of Bukhainagor GC-Charmonai Lanchghat road (Ch.00m-1000m) (b) Construction of 01 no 1.60mx1.60m culvert at ch.595 on the same road.
|
IRIDP-2
|
barishal-s
|
506514022
|
1.00
|
|
|
56.76
|
M/S. Electro Globe
|
41.52
|
20/04/2016
|
|
30/12/2017
|
75
|
|
|
08/04/2019
|
|
380
|
IRIDP-2/BRS/DW-49
|
(a)Improvement of Chandromohan UP Office-Veduria Lanchghat via Chandromohan GC.road (Ch.1850m-3075m)
|
IRIDP-2
|
barishal-s
|
506513011
|
1.23
|
|
|
56.10
|
M/S. Electro Globe
|
56.10
|
20/04/2016
|
|
30/12/2017
|
40
|
|
|
08/04/2019
|
|
381
|
IRIDP-2/BRS/DW-50
|
(a)Improvement of Chandpura Bairagi Bari R&H Durgapur hat Via Chandpur UP road (Ch.2500m-3500m) (b) Construction of 01no 1.00mx1.0m culvert at ch.3116m on the same road.
|
IRIDP-2
|
barishal-s
|
506513005
|
1.00
|
|
|
56.23
|
M/S. Electro Globe
|
41.01
|
19/05/2016
|
|
30/12/2017
|
70
|
|
|
08/04/2019
|
|
382
|
IRIDP-2/BRS/DW-51
|
Improvement of Charkaremji Mora Nadi - Charaicha Poler hat road (ch.1200m - 2630m)
|
IRIDP-2
|
barishal-s
|
506515029
|
1.43
|
|
|
61.60
|
M/S. Electro Globe
|
41.75
|
19/05/2016
|
|
30/12/2017
|
70
|
|
|
08/04/2019
|
|
383
|
IRIDP-2/BRS/SDW-59
|
(a)Improvement of Bisarad C&B – Barakandi C&B road via Patang Bipon doctor bari (Patang Sukhoronjon master bari Radha krishno seba asrom to sadu goaler bari)Road (Ch.3817m - 5100m) Asrom & Mondir link road 100.0m (b) Construction of 01 no 1.60mx1.60m culvert at ch.4811m on the same road.
|
IRIDP-2
|
barishal-s
|
506514062
|
1.38
|
|
|
62.40
|
M/S. Auditi Enterprise
|
51.36
|
16/06/2016
|
|
15/06/2017
|
15
|
|
|
08/04/2019
|
|
384
|
IRIDP-2/BRS/DW-111
|
(a)Improvement of Charkawa UP Officee -Charkaramji Asrayn Project Via Diner Pry. schoo,Ghoper Hat.road (Ch.00m - 1558m)(b)Construction of 01no 1.6mx1.6 m culvert at ch.805.0m on the same road.
|
IRIDP-2
|
barishal-s
|
506514025
|
1.56
|
|
|
87.08
|
Orient Trading & Builders LTD.
|
78.37
|
01/06/2017
|
|
15/10/2018
|
95
|
|
|
08/04/2019
|
|
385
|
IRIDP-2/BRS/DW-112
|
(a)Improvement of Char Aicha Gazi Bari School-Ghoper hat (West Side).road (Ch.671m - 1671m)(b)Construction of 01no 3.0mx3.0 m culvert at ch.1384m on the same road.
|
IRIDP-2
|
barishal-s
|
506514028
|
1.00
|
|
|
65.06
|
M/S. Rupali Construction
|
58.56
|
01/06/2017
|
|
07/01/2018
|
70
|
|
|
08/04/2019
|
|
386
|
IRIDP-2/BRS/DW-119
|
Improvement of Kashipur Bakarir Poll - Purbo Billa Bari GPS - Mukondropotty GPS..road (Ch.00m – 1000m) ID NO 506514186
|
IRIDP-2
|
barishal-s
|
506514186
|
1.00
|
|
|
59.16
|
M/S. Nupur Store
|
53.25
|
13/08/2017
|
|
20/05/2018
|
55
|
|
|
08/04/2019
|
|
387
|
IRIDP-2/BRS/DW-120
|
(a) Improvement of Karnokati Red Crecent to Karnokati Anowar Hossain Bari road (Ch.00m - 1275m) ID NO 506514079(b)Construction of 02no 1.6mx1.6 m culvert at ch.982m &1073mon the same road.
|
IRIDP-2
|
barishal-s
|
506514079
|
1.28
|
|
|
77.87
|
M/S. Mohiuddin Ahmed
|
70.08
|
10/08/2017
|
|
14/10/2018
|
70
|
|
|
08/04/2019
|
|
388
|
IRIDP-2/BRS/DW-121
|
(a)Improvement of Veduria Lanch Ghat-Khorshed Chowkider Bari – East Veduria GPS road (Ch.1550m - 2000m) ID NO 506515054(b)Construction of 01no 1.6mx1.6 m culvert at ch.1775 on the same road.
|
IRIDP-2
|
barishal-s
|
506515054
|
0.45
|
|
|
31.91
|
M/S. Santu Traders
|
28.72
|
19/10/2017
|
|
05/12/2018
|
65
|
|
|
08/04/2019
|
|
389
|
IRIDP-2/BRS/DW-125
|
Improvement of Karapur Mira Bari Poll-Afjal Khan Bari Via Mia Khar Bari Mosque.road (Ch.00m - 564m) ID NO 506515089
|
IRIDP-2
|
barishal-s
|
506515089
|
0.56
|
|
|
56.55
|
M/S. Mohiuddin Ahmed
|
5089.00
|
10/08/2017
|
|
30/05/2019
|
45
|
|
|
08/04/2019
|
|
390
|
IRIDP-2/BRS/SDW-187
|
Improvement of Moulavir hat Dhopa Barir More-Shaheber hat Gabtala Via Biswash Bari. road (Ch.1150m-1700m) ID NO.506514155
|
IRIDP-2
|
barishal-s
|
506514155
|
0.55
|
|
|
33.75
|
M/S. Ma Babar Doa Traders
|
32.06
|
26/06/2018
|
|
03/01/2019
|
70
|
|
|
08/04/2019
|
|
391
|
IRIDP-2/BRS/SDW-207
|
(a)Improvement of Karnokati RR GPS - Abdul Sabur Khan Bari - Muktijoddah Abul Basharer Bari road (Ch.00m - 335m) ID NO 506515172(b)Construction of 01no 0.90mx0.90m culvert at ch.300m on the same road.
|
IRIDP-2
|
barishal-s
|
506515172
|
0.34
|
|
|
26.13
|
M/S. Siam Enterprise
|
24.82
|
30/08/2018
|
|
07/03/2019
|
0
|
|
|
08/04/2019
|
|
392
|
IRIDP-2/BRS/DW-228
|
(a)Improvement Ramkati-Ramkati Bazar Via Panbaria Adarsha Gram & Panbaria Madrasha.road (Ch.3126m - 4610m) ID NO 506514013(b)Construction of 02no 1.60mx1.60m culvert at ch.3529m,3567m on the same road. 6,884,094.00 18-Feb-19 6,539,889.30
|
IRIDP-2
|
barishal-s
|
506514013
|
1.48
|
|
|
68.84
|
M/S. Rahat Enterprise
|
65.39
|
18/02/2019
|
|
25/11/2019
|
10
|
|
|
08/04/2019
|
|
393
|
IRIDP-2/BRS/DW-230
|
(a)Chandipur Achintala Mosque - Muktijoddah Ahsan Ali Bari Ch.603m - 980m) ID NO 506515211 & link towards khanbari185.0m, Muktijoddah Ahasan, Shajahan bari 152.0m(b)Construction of 01no 1.0mx1.0m culvert at ch.755m on the same road.
|
IRIDP-2
|
barishal-s
|
506515211
|
0.71
|
|
|
52.19
|
|
0.00
|
|
|
|
0
|
|
|
08/04/2019
|
|
394
|
IRIDP-2/BRS/MW-58
|
(a)Maintenance of Uttar Karapur Sikder Bari Mosque -Hazi Bari Road (Ch.00m - 1495m) (b) Construction of 01 no 1.60mx1.60m culvert at ch.501m on the same road.
|
IRIDP-2
|
barishal-s
|
506515009
|
1.50
|
|
|
33.01
|
M/S. Auditi Enterprise
|
26.18
|
16/06/2016
|
|
18/11/2018
|
100
|
|
|
07/04/2019
|
|
395
|
IRIDP-2/BRS/DW-60
|
(a)Improvement of Dharmadi molar bridge – Maydan khola via Katurakati Salam Khandojar house Road (Ch.500m - 1464m) Link. Mohila madrasha 180.0m, Darul Ulum madrasha 170.0m & Mosque 30.0m(b) Construction of 03no 1.60mx1.60m culvert at ch.684m,748m & 1224m on the same road.(c) Construction of 01no 0.375mx0.45m culvert at ch.938m on the same road. 7,085,057.00 Mir Jasim Uddin 31-Oct-16 5,313,517.01
|
IRIDP-2
|
barishal-s
|
506514142
|
1.34
|
|
|
70.85
|
Mir Jasim Uddin
|
53.13
|
31/10/2016
|
|
30/03/2018
|
100
|
|
|
07/04/2019
|
|
396
|
IRIDP-2/BRS/SDW-62
|
(a) Improvement of Taltali-Sayestabad Bazar Via West Char Aicha road (Ch.00m - 1000m) & Link road 120m.(b) Construction of 01no 2x4.0mx4.0m culvert at ch.10.0m on the same road.(c) Construction of 02no 1.60mx1.60m culvert at ch.750m & 995m on the same road.
|
IRIDP-2
|
barishal-s
|
506515017
|
1.12
|
|
|
88.48
|
M/S. Khan Engineering Corporation
|
68.78
|
24/01/2017
|
|
12/02/2018
|
100
|
|
|
07/04/2019
|
|
397
|
IRIDP-2/BRS/DW-46
|
(a)Improvement of Kashipur Six Mil0e-Lakutia Babur hat road (ch.1000m-2000m) (b) Construction of 01 no 1.60mx1.60m culvert at ch.1675 on the same road.
|
IRIDP-2
|
barishal-s
|
506514140
|
1.00
|
|
|
65.38
|
Md. Shamsul Alam
|
47.24
|
20/04/2016
|
|
30/03/2018
|
100
|
|
|
07/04/2019
|
|
398
|
IRIDP-2/BRS/DW-46
|
(a)Improvement of Kashipur Six Mile-Lakutia Babur hat road (ch.1000m-2000m) (b) Construction of 01 no 1.60mx1.60m culvert at ch.1675 on the same road.
|
IRIDP-2
|
barishal-s
|
506514140
|
1.00
|
|
|
65.38
|
Md. Shamsul Alam
|
47.24
|
20/04/2016
|
|
30/03/2018
|
100
|
|
|
04/04/2019
|
|
399
|
IRIDP-2/BRS/DW-110
|
(a)Improvement of Charkawa Karnokati Bhola Road Delowerer Bari - late Mazed Khan Bari via AL-Aksha Mosque.road (Ch.00m - 1052m) & Link road 90.0m(b)Construction of 02no 1.0mx1.0 m culvert at ch.203m &465m on the same road. 6,399,130.10 6-Mar-17 4,479,468.13
|
IRIDP-2
|
barishal-s
|
506515160
|
1.14
|
|
|
63.99
|
M/S. Shuley Traders
|
44.79
|
06/03/2017
|
|
30/12/2017
|
100
|
|
|
04/04/2019
|
|
400
|
IRIDP-2/BRS/DW-113
|
Improvement of Darmadi Rattron Holader Bari To 27No Word Via kalam khan Bari.road (Ch.00m – 490.0m) 2,470,035.00 24-May-17 2,470,035.00
|
IRIDP-2
|
barishal-s
|
506515132
|
0.49
|
|
|
24.70
|
M/S. Khondokar Brothers
|
24.70
|
24/05/2017
|
|
25/05/2018
|
100
|
|
|
04/04/2019
|
|
401
|
IRIDP-2/BRS/DW-123
|
(a)Improvement of Gilatoli Mina brick field- Shahalom khan bari Road (Ch.00m - 584m) ID NO 506515504(b)Construction of 01no 1.6mx1.6 m culvert at ch.350 on the same road.
|
IRIDP-2
|
barishal-s
|
506515504
|
0.58
|
|
|
34.95
|
M/S. Kohinoor Enterprise
|
31.46
|
26/07/2017
|
|
15/06/2018
|
100
|
|
|
04/04/2019
|
|
402
|
IRIDP-2/BRS/MW-126
|
a) Maintenance of Textile-Lakutia Road via Amirgonj Bazar.road (Ch.4144m - 6314m) ID NO 506514138b) Construction of 01no 0.625mx0.60m culvert at ch.4622m on the same road.
|
IRIDP-2
|
barishal-s
|
506514138
|
2.17
|
|
|
68.50
|
M/S. Mohiuddin Ahmed
|
61.65
|
10/08/2017
|
|
15/11/2018
|
100
|
|
|
04/04/2019
|
|
403
|
IRIDP-2/BRS/MW-127
|
a) Maintenance of Taltoli Bazar-Lamchari hat road (Ch.2610m - 4000m) ID NO 506514139b)Construction of 01no 1.60mx1.60m culvert at ch.3645m on the same road.
|
IRIDP-2
|
barishal-s
|
506514139
|
1.39
|
|
|
51.37
|
M/S. Mohiuddin Ahmed
|
46.23
|
10/08/2017
|
|
15/12/2018
|
100
|
|
|
04/04/2019
|
|
404
|
IRIDP-2/BRS/MW-158
|
a) Maintenance of C & B Raintree tala (RHD) - Basher hat via Sholnahat road (Ch.2000m -4000m) ID NO 506514141.(b) Construction of 01no 2.0m x 2.0 m culvert at ch.2269m on the same road.(c) Construction of 01no 1.60 m x 1.60 m culvert at ch.3119m & 3486m on the same road.
|
IRIDP-2
|
barishal-s
|
506514141
|
2.00
|
|
|
64.13
|
M/S. Khandaker Shahin Ahmed
|
57.72
|
10/08/2017
|
|
15/11/2018
|
100
|
|
|
04/04/2019
|
|
405
|
IRIDP-2/BRS/DW-140
|
(a)Improvement of Chandrahar Bazar-Noapara GPS road (Ch.00m - 1700m) ID NO 506324118(b)Construction of 01no 0.625mx0.6 m culvert at ch.132 on the same road.
|
IRIDP-2
|
gouranadi
|
506324118
|
1.70
|
|
|
102.66
|
Nojiron Corporation
|
107.74
|
15/11/2017
|
|
07/01/2019
|
55
|
|
|
02/04/2019
|
|
406
|
IRIDP-2/BRS/DW-54
|
Improvement of Road Chandrahar bazar - Nalchira Bazar via Kali bari Bazar road (ch.00m-1850m)
|
IRIDP-2
|
gouranadi
|
506324016
|
1.85
|
|
|
102.79
|
M/S. Feroj Alom
|
106.36
|
23/06/2016
|
|
27/02/2018
|
100
|
|
|
31/03/2019
|
|
407
|
IRIDP-2/BRS/DW-55
|
Improvement of North Magura Eidga – North Magura forkania madrasha. road(Ch.00-1300m.)
|
IRIDP-2
|
gouranadi
|
506324036
|
1.30
|
|
|
79.08
|
M/S. Talukder Enterprise
|
82.98
|
19/06/2016
|
|
19/05/2017
|
100
|
|
|
31/03/2019
|
|
408
|
IRIDP-2/BRS/DW-56
|
Improvement of Kalabariah RPS - Nalchira hospital via kutubshar mazar road (Ch. 00-1020m)
|
IRIDP-2
|
gouranadi
|
506324062
|
1.02
|
|
|
58.31
|
M/S. Talukder Enterprise
|
61.18
|
19/06/2016
|
|
13/04/2017
|
100
|
|
|
31/03/2019
|
|
409
|
IRIDP-2/BRS/DW-74
|
(a)Improvement Of Bagar - DSB hat via Baghar GPS Road (Ch.00m - 1198m)(b) Maitenance of 01no. 14.00m Bridge at ch.1171m on the same road.
|
IRIDP-2
|
gouranadi
|
506324087
|
1.20
|
|
|
72.55
|
M/S. Sharif Enterprise
|
72.55
|
08/01/2017
|
|
28/07/2018
|
100
|
|
|
31/03/2019
|
|
410
|
IRIDP-2/BRS/DW-75
|
(a)Improvement Of Labutoli Bazar-Badarpur GC Road via Mir Kutub Shah Mazar (Mahilara Up office old Kasemabad (RHD)-Nalchira Bazar) Road (Ch.1750m - 3762m)(b) Construction of 01no 0.625mx0.60m culvert at ch.2756m on the same road.
|
IRIDP-2
|
gouranadi
|
506324104
|
2.01
|
|
|
115.26
|
M/S. G.M. Construction
|
120.94
|
20/03/2017
|
|
30/11/2018
|
100
|
|
|
31/03/2019
|
|
411
|
IRIDP-2/BRS/DW-139
|
(a)Improvement of Salta Bazar-Vallukshi Bazar.road (Ch.00m - 1010m) ID NO 506324116b)Construction of 01no 0.625mx0.60m culvert at ch.508m on the same road.c)Construction of 01no 2x4.0mx4.0m culvert at ch.797m on the same road.
|
IRIDP-2
|
gouranadi
|
506324116
|
1.01
|
|
|
76.60
|
Nojiron Corporation
|
80.39
|
15/11/2017
|
|
14/02/2018
|
100
|
|
|
31/03/2019
|
|
412
|
IRIDP-2/BRS/DW-141
|
Improvement of Illa Vanga - East Dumuria Govt Primary school Via Karikorpara road (Ch.00m – 1246m)
|
IRIDP-2
|
gouranadi
|
ID NO 506325025
|
1.25
|
|
|
87.88
|
Nojiron Corporation
|
87.88
|
15/11/2017
|
|
30/11/2018
|
100
|
|
|
31/03/2019
|
|
413
|
IRIDP-2/BRS/DW-143
|
Improvement of Tara High School(NHW) - Tarakupi GPS via Abdul Hye Master House road (Ch.00m - 1000m) ID NO 506325038
|
IRIDP-2
|
gouranadi
|
506325038
|
1.00
|
|
|
63.34
|
Nojiron Corporation
|
66.57
|
15/11/2017
|
|
28/02/2019
|
100
|
|
|
31/03/2019
|
|
414
|
IRIDP-2/BRS/SDW-157
|
Conastruction of 3x4.50mx5.0m culvert at ch:1410m on Donerkandi purbapara Kalimondir - Bisnowkarati Rice mill road.
|
IRIDP-2
|
gouranadi
|
506324080
|
|
|
|
28.44
|
Nojiron Corporation
|
29.85
|
15/11/2017
|
|
20/04/2018
|
100
|
|
|
31/03/2019
|
|
415
|
IRIDP-2/BRS/DW-1
|
(a) Improvement of Road from Batazore GC to Laxmonkathi bazar via Dhakhin Pashim para.(Batazor GC to sholok bazar via jugikathi from ch.1013-2013m. (b) Construction of 02nos 0.625mx0.0.60m culvert at ch.1120m & 1455m on the same road.
|
IRIDP-2
|
gouranadi
|
|
1.00
|
|
|
68.83
|
M/S. Pizush Enterprise
|
57.76
|
|
21/02/2016
|
19/11/2016
|
100
|
|
|
|
|
416
|
IRIDP-2/BRS/DW-2
|
(a) Improvement of road from Nalchira up office to Diasur bazar via Char Ramjanpur GPS (Ch.750-1750m.) (b) Construction of 01no 0.625mx0.0.60m culvert at ch.1305m on the same road.
|
IRIDP-2
|
gouranadi
|
|
1.00
|
|
|
61.91
|
M/S. Pizush Enterprise
|
51.28
|
|
21/02/2016
|
19/11/2016
|
100
|
|
|
|
|
417
|
IRIDP-2/BRS/DW-3
|
Improvement of road from Satkabla to Gournadi Utter Chandsi GPS-Gournadi Bondor Via Utter palordi GPS (Ch. 00-1415m)
|
IRIDP-2
|
gouranadi
|
|
1.41
|
|
|
88.66
|
M/S. Pizush Enterprise
|
74.45
|
|
21/02/2016
|
19/11/2016
|
100
|
|
|
|
|
418
|
IRIDP-2/BRS/DW-152
|
(a)Improvement of Moultala High School(RHD)-Kilerhat (UZR)Via Rezbi Khan Bari road (Ch.00m - 1700m) ID NO 506365006(b)Construction of 02no 0.625mx0.60m culvert at ch.337m&1155m on the same road.
|
IRIDP-2
|
hizla
|
506365006
|
1.70
|
|
|
96.59
|
M/S. Dawn Corporation
|
86.93
|
28/09/2017
|
|
04/07/2018
|
85
|
|
|
07/04/2019
|
|
419
|
IRIDP-2/BRS/DW-181
|
(a) Improvement of Baherchar-Baushia Road (Ch.2700m - 3200m) ID NO 506365012(b)Construction of 02no 0.625mx0.60m culvert at ch.183m,435m on the same road.
|
IRIDP-2
|
hizla
|
506365012
|
0.50
|
|
|
32.68
|
Md. Mahafuz Khan
|
32.62
|
16/04/2018
|
|
23/10/2018
|
90
|
|
|
07/04/2019
|
|
420
|
IRIDP-2/BRS/DW-41
|
(a)Improvement of road from Abda Bazar-Kakuria Bazar (Ch. 00m-1000m.) (b) Construction of 01no 0.625mx0.9m culvert at ch.825m on the same road.
|
IRIDP-2
|
hizla
|
506365054
|
1.00
|
|
|
36.80
|
M/S. Islam Brothers
|
30.41
|
07/04/2016
|
|
06/08/2016
|
100
|
|
|
04/04/2019
|
|
421
|
IRIDP-2/BRS/DW-42
|
Improvement of road from Bander Hat - Molovir Hat(Ch. 1600m-2957m.)
|
IRIDP-2
|
hizla
|
506364009
|
1.37
|
|
|
47.67
|
M/S. B B International
|
38.84
|
03/04/2016
|
|
09/10/2016
|
100
|
|
|
04/04/2019
|
|
422
|
IRIDP-2/BRS/DW-43
|
(a) Improvement of road from Khunna Hospital(RHD) via Kawmi Madrasha -Baherchar (UZR) (Ch.1500m-2693m.) (b) Construction of 01 no 3.0mX3.0m culvert at ch. 1546m on the same road. 4,732,192.00 3-Apr-16 3,188,158.46
|
IRIDP-2
|
hizla
|
506365049
|
1.19
|
|
|
47.32
|
M/S. B B International
|
31.88
|
03/04/2016
|
|
30/06/2016
|
100
|
|
|
04/04/2019
|
|
423
|
IRIDP-2/BRS/DW-65
|
(a)Improvement Of Dhanushikder Hat Via Abupur Kheya Ghat - Memania Taker Hat Road (Ch.6605m - 7255m)(b) Construction of 01no 0.625mx0.60m culvert at ch.6630m on the same road. 2,048,814.00 1,934,287.40
|
IRIDP-2
|
hizla
|
506362005
|
0.65
|
|
|
20.48
|
M/S. Apu Enterprise
|
19.34
|
29/01/2017
|
|
30/05/2017
|
100
|
|
|
04/04/2019
|
|
424
|
IRIDP-2/BRS/DW-66
|
Improvement Of Dhanushikder Hat Via Abupur Kheya Ghat - Memania Taker Hat Road (Ch.7515m - 8705m)
|
IRIDP-2
|
hizla
|
506362005
|
1.19
|
|
|
42.87
|
M/S. B.B International
|
41.73
|
16/01/2017
|
|
30/03/2017
|
100
|
|
|
04/04/2019
|
|
425
|
IRIDP-2/BRS/DW-67
|
(a)Improvement Of Hizla Taker Bazar (Upazila H/Q)-Mehendigonj Upazila Road (Via Moddah Bawsia Gps) (Ch.628m-2692m)(b) Construction of 01no 4.0mx4.0m culvert at ch.1900m on the same road.
|
IRIDP-2
|
hizla
|
506362010
|
2.06
|
|
|
74.80
|
Md. Sirajul Islam Hanif
|
74.79
|
28/02/2017
|
|
30/12/2017
|
100
|
|
|
04/04/2019
|
|
426
|
IRIDP-2/BRS/DW-68
|
Improvement Of Char Pattni vanga Jalil Bapary Bari via Reg Pry School (Ch.00m - 3000m)
|
IRIDP-2
|
hizla
|
506365040
|
3.00
|
|
|
83.65
|
M/S. Lutful Kabir
|
75.29
|
02/04/2017
|
|
21/01/2018
|
100
|
|
|
04/04/2019
|
|
427
|
IRIDP-2/BRS/DW-151
|
Improvement of Barjalia UP office -Kaisma Bazar via Food Goudaun & College road (Ch.00m - 1010m) ID NO 506363003
|
IRIDP-2
|
hizla
|
506363003
|
1.01
|
|
|
29.76
|
M/S Amir Engineering corporation
|
26.78
|
04/10/2017
|
|
28/03/2018
|
100
|
|
|
04/04/2019
|
|
428
|
IRIDP-2/BRS/DW-169
|
(a)Improvement of Kawria - Bandorhat road (Ch.00m - 2000m) ID NO 506365020(b)Construction of 01no 0.625mx0.60m culvert at ch.1090m on the same road. 7,897,069.46 26-Nov-17 7,107,362.51
|
IRIDP-2
|
hizla
|
506365020
|
2.00
|
|
|
78.97
|
M/S Amir Engineering corporation
|
71.07
|
26/11/2017
|
|
04/04/2018
|
100
|
|
|
04/04/2019
|
|
429
|
IRIDP-2/BRS/DW-170
|
(a)Improvement of Goler Hat (RHD) Via Moddah Mashkata Ali Ahmed GPS - Bander Hat road (Ch.00m - 1945m) ID NO 506365062(b)Construction of 02no 0.625mx0.60m culvert at ch.595m & 1403 on the same road.
|
IRIDP-2
|
hizla
|
506365062
|
1.95
|
|
|
62.23
|
M/S Amir Engineering corporation
|
56.00
|
26/11/2017
|
|
20/05/2018
|
100
|
|
|
04/04/2019
|
|
430
|
IRIDP-2/BRS/DW-63
|
Improvement Of Dhanushikder Hat Via Abupur Kheya Ghat - Memania Taker Hat Road (Ch.400m - 995m) 1,559,755.00 29-Jan-17 1,472,567.23
|
IRIDP-2
|
hizla
|
506362005
|
0.60
|
|
|
15.59
|
M/S. Apu Enterprise
|
14.72
|
29/01/2017
|
|
30/03/2017
|
100
|
|
|
04/04/2019
|
|
431
|
IRIDP-2/BRS/DW-64
|
Improvement Of Dhanushikder Hat Via Abupur Kheya Ghat - Memania Taker Hat Road (Ch.2545m - 6500m)
|
IRIDP-2
|
hizla
|
506362005
|
3.96
|
|
|
109.52
|
M/S. Lutful Kabir
|
108.40
|
29/01/2017
|
|
28/02/2019
|
100
|
|
|
04/04/2019
|
|
432
|
IRIDP-2/BRS/DW-168
|
(a)Improvement of Maulavir hut(UZR) Via Uttor Guabatia Gps- Kawria Bazer Dhanusikder hut road(UZR) road (Ch.00m - 2460m) ID NO 506364015(b)Construction of 02no 0.625mx0.60m culvert at ch.1110m & 2205m on the same road.
|
IRIDP-2
|
hizla
|
506364015
|
2.46
|
|
|
134.23
|
M/S. Kohinoor Enterprise
|
120.80
|
26/11/2017
|
|
30/01/2019
|
100
|
|
|
04/04/2019
|
|
433
|
IRIDP-2/BRS/DW-171
|
(a)Improvement of Harinathpur Farid Khonder Bari(UZR) -Veri Bandth (UZR) road (Ch.00m - 1110m) ID NO 506364022(b)Construction of 02no 0.625mx0.60m culvert at ch.520m & 835 on the same road.
|
IRIDP-2
|
hizla
|
506364022
|
1.11
|
|
|
33.28
|
M/S Amir Engineering corporation
|
29.95
|
26/11/2017
|
|
11/09/2018
|
100
|
|
|
04/04/2019
|
|
434
|
IRIDP-2/BRS/DW-145
|
Improvement of Noyakhali-Aligonj GC .road (Ch.800m - 1800m) ID NO 506625095
|
IRIDP-2
|
mehendiganj
|
506625095
|
1.00
|
|
|
36.30
|
M/S. Hasan Construction
|
34.47
|
27/09/2017
|
|
04/03/2018
|
70
|
|
|
07/04/2019
|
|
435
|
IRIDP-2/BRS/DW-146
|
Improvement of Biddanondopur UP-Dafaderhat (Baro Bridge) road (Ch.00m - 2100m) ID NO
|
IRIDP-2
|
mehendiganj
|
506623020
|
2.10
|
|
|
69.56
|
M/S. Hasan Construction
|
66.07
|
27/09/2017
|
|
30/05/2018
|
60
|
|
|
07/04/2019
|
|
436
|
IRIDP-2/BRS/DW-149
|
(a)Improvement of Mathertoly Bazar- Fokiraer pool Via keshipur High School Road(Ch.650m - 2500m) ID NO 506625345(b)Construction of 02no 0.625mx0.6 m culvert at ch.1500m&1700m on the same road.
|
IRIDP-2
|
mehendiganj
|
506625345
|
1.85
|
|
|
69.64
|
M/S. Hasan Construction
|
65.45
|
27/09/2017
|
|
04/03/2018
|
15
|
|
|
07/04/2019
|
|
437
|
IRIDP-2/BRS/DW-179
|
Improvement of Char Ekkaria Uttarchar Brick Field (RAMB) – Hijla River Ghat Road (Ch.000m - 490m) ID NO 506625419
|
IRIDP-2
|
mehendiganj
|
506625419
|
0.49
|
|
|
29.98
|
M/S Amir Engineering corporation
|
28.47
|
28/03/2018
|
|
05/10/2018
|
40
|
|
|
07/04/2019
|
|
438
|
IRIDP-2/BRS/DW-180
|
Improvement of Gabtoli Bazar-Posshim Bongga GPS Via Hurarhat,Adarsha Gram,Noli Bari road (Ch.300m - 3025m) ID NO 506625025
|
IRIDP-2
|
mehendiganj
|
506625025
|
2.73
|
|
|
73.81
|
M/S Mother Engineering
|
70.12
|
24/07/2018
|
|
01/05/2019
|
30
|
|
|
07/04/2019
|
|
439
|
IRIDP-2/BRS/DW-40
|
Improvement of road from Jangalia RHD - Mainuddin Majhi Bari ( Ch. 00m-600m.)
|
IRIDP-2
|
mehendiganj
|
506625341
|
0.60
|
|
|
19.90
|
M/S. Hasan Construction
|
17.08
|
02/03/2016
|
|
06/08/2016
|
100
|
|
|
04/04/2019
|
|
440
|
IRIDP-2/BRS/DW-61
|
Improvement of Muktijodda Mostafa Kamal H/S – Natun Bazar Road (Ch.00m - 800m) 2,529,605.00 2,440,309.12
|
IRIDP-2
|
mehendiganj
|
506625357
|
0.80
|
|
|
25.29
|
M/S. Talukder Enterprise
|
24.40
|
22/11/2016
|
|
15/03/2017
|
100
|
|
|
04/04/2019
|
|
441
|
IRIDP-2/BRS/DW-70
|
(a)Improvement Of Shonamukhi Mazikandi house – Kasem sir house bridge road .(Ch.00m - 702m)(b) Construction of 01no 2.0mx2.0m culvert at ch.304m on the same road.
|
IRIDP-2
|
mehendiganj
|
506625418
|
0.70
|
|
|
29.49
|
M/S. Lutful Kabir
|
27.72
|
07/05/2017
|
|
30/10/2018
|
100
|
|
|
04/04/2019
|
|
442
|
IRIDP-2/BRS/DW-148
|
(a)Improvement of Lata UP (Gabtoli Bazar)- Notun Kasherhat via Hurar hat Road (Ch.2038m - 3840m) ID NO 506623019(b)Construction of 01no 0.625mx0.6 m culvert at ch.2501 on the same road. 5,855,712.13 4-Oct-17 5,270,140.91
|
IRIDP-2
|
mehendiganj
|
506623019
|
1.80
|
|
|
58.55
|
M/S Amir Engineering corporation
|
52.70
|
04/10/2017
|
|
04/05/2018
|
100
|
|
|
04/04/2019
|
|
443
|
IRIDP-2/BRS/DW-150
|
Improvement of Sikdererhat-H/O Khales Bhuiyan road (Ch.00m - 1370m) ID NO 506625054
|
IRIDP-2
|
mehendiganj
|
506625054
|
1.37
|
|
|
35.66
|
M/S. Lutful Kabir
|
33.31
|
10/10/2017
|
|
30/05/2018
|
100
|
|
|
04/04/2019
|
|
444
|
IRIDP-2/BRS/DW-165
|
(a)Improvement Dhakin Charhogla GPS-Moddo Charhogla Mosqueroad (Ch.00m - 1000m) ID NO 506625107(b)Construction of 01no 0.625mx0.60m culvert at ch.618m on the same road. 3,103,569.48 12-Nov-17 2,948,391.00
|
IRIDP-2
|
mehendiganj
|
506625107
|
1.00
|
|
|
31.03
|
M/S Amir Engineering corporation
|
29.48
|
12/11/2017
|
|
30/07/2018
|
100
|
|
|
04/04/2019
|
|
445
|
IRIDP-2/BRS/DW-166
|
Improvement South Char Hogla GPS - North side Gopal sikder Bari via kalimondir, patarhat - kajirhat GC..road (Ch.00m - 576m) ID NO 506625360
|
IRIDP-2
|
mehendiganj
|
506625360
|
0.58
|
|
|
17.12
|
M/S Amir Engineering corporation
|
16.26
|
12/11/2017
|
|
22/05/2018
|
100
|
|
|
04/04/2019
|
|
446
|
IRIDP-2/BRS/DW-167
|
Improvement of Char hogla fridom fighter Sayed vhoya Bari - Nijamuddin Bepari Bari Road.(Ch.00m - 630m) ID NO 506625362
|
IRIDP-2
|
mehendiganj
|
506625362
|
0.63
|
|
|
18.73
|
M/S Amir Engineering corporation
|
17.80
|
12/11/2017
|
|
30/09/2018
|
100
|
|
|
04/04/2019
|
|
447
|
IRIDP-2/BRS/DW-35
|
(a)Improvement of road from Bangla Bazar to Notun Kasherhat via Lata UP (Gabtoli Bazar) to Hurar hat ( Ch. 580m-2080m.) b) Construction of 01no 2.0mx2.0m culvert at ch.874m on the same road. (c) Construction of 03nos 0.625mx0.60m culvert at ch.1169m,1394m&1614m on the same road.
|
IRIDP-2
|
mehendiganj
|
506623002
|
1.50
|
|
|
55.90
|
M/S. Hasan Construction
|
47.99
|
02/03/2016
|
|
28/11/2016
|
100
|
|
|
04/04/2019
|
|
448
|
IRIDP-2/BRS/DW-39
|
(a)Improvement of road from Darichar Khajuria Senior Madrasha-Orakul road via Gazirhat (Ch. 00m-1500m.) (b) Construction of 01no 1.50mx1.50m culvert at ch.100m on the same road. 4,689,777.00 2-Mar-16 4,036,562.21
|
IRIDP-2
|
mehendiganj
|
506625237
|
1.50
|
|
|
46.89
|
M/S. Hasan Construction
|
40.36
|
02/03/2016
|
|
28/02/2019
|
100
|
|
|
04/04/2019
|
|
449
|
IRIDP-2/BRS/DW-69
|
(a)Improvement Of H/O Hanif Bepari - Bajidkha Kheyaghat via Char Bhouduba Jame -Mosque.(Ch.00m - 664m)
|
IRIDP-2
|
mehendiganj
|
506625247
|
0.66
|
|
|
17.47
|
M/S. Hasan Construction
|
17.47
|
29/01/2017
|
|
30/08/2018
|
100
|
|
|
04/04/2019
|
|
450
|
IRIDP-2/BRS/DW-147
|
(a)Improvement of Lata UP (Gabtoli Bazar)-Bangla Bazar road (Ch.680m – 3441m) ID NO 506623002(b)Construction of 01no 0.625mx0.6 m culvert at ch.1089 on the same road.
|
IRIDP-2
|
mehendiganj
|
506623002
|
2.76
|
|
|
84.68
|
M/S Amir Engineering corporation
|
76.21
|
04/10/2017
|
|
10/02/2019
|
100
|
|
|
04/04/2019
|
|
451
|
IRIDP-2/BRS/DW-38
|
(a)Improvement of road from Kasipur High School-Sahid Babul Sarok via Sree Hori Narawon Nath Bari ( Ch. 00m-1510m.) (b) Construction of 01no 0.625mx0.60m culvert at ch.973 m on the same road. 5,179,695.00 2-Mar-16 4,482,405.73
|
IRIDP-2
|
mehendiganj
|
506625356
|
1.51
|
|
|
51.79
|
M/S. Hasan Construction
|
44.82
|
02/03/2016
|
|
20/04/2018
|
100
|
|
|
04/04/2019
|
|
452
|
IRIDP-2/BRS/DW-71
|
Improvement Of Charhogla Shonamukhi Ukil bari – Pokki mai bari .(Ch.00m - 1360m)
|
IRIDP-2
|
mehendiganj
|
506625417
|
1.36
|
|
|
51.80
|
M/S. Hasan Construction
|
43.98
|
29/01/2017
|
|
30/01/2019
|
95
|
|
|
04/04/2019
|
|
453
|
IRIDP-2/BRS/DW-72
|
Improvement Of Vandarighata to Kashipur High school..(Ch.00m - 2275m) 8,692,121.00 15-Jan-17 7,382,654.46
|
IRIDP-2
|
mehendiganj
|
506625227
|
2.27
|
|
|
86.92
|
M/S. Hasan Construction
|
73.82
|
15/01/2017
|
|
30/03/2019
|
80
|
|
|
04/04/2019
|
|
454
|
IRIDP-2/BRS/DW-73
|
Improvement of Patnighata Bridge (Sadekpur) - Razzak kabiraz House via Akon house. .(Ch.00m - 940m)
|
IRIDP-2
|
mehendiganj
|
506625296
|
0.94
|
|
|
32.25
|
M/S. Lutful Kabir
|
30.47
|
07/05/2017
|
|
19/10/2018
|
75
|
|
|
04/04/2019
|
|
455
|
IRIDP-2/BRS/DW-34
|
(a)Improvement of road from Andermanik UP - Bonikerhat Bazar via Ekkoterhat Bazar & Khunna Bazar ( Ch. 315m-4000m.) b) Construction of 01no 2.0mx2.0m culvert at ch.2772m on the same road. (c) Construction of 03nos 0.625mx0.60m culvert at ch.860m,2240m&2643m on the same road.
|
IRIDP-2
|
mehendiganj
|
506623001
|
3.69
|
|
|
102.40
|
M/S. Lutful Kabir
|
94.72
|
27/06/2016
|
|
04/03/2017
|
100
|
|
|
03/04/2019
|
|
456
|
IRIDP-2/BRS/DW-36
|
(a)Improvement of Road from Alimabad UP (Majkajir char Bazar)-Sreepur Bazar via Gaguria Bazar, Mohisa Khayaghat (Ch. 1625m -3190m.) (b) Construction of 03nos 0.625mx0.60m culvert at ch.1835m,2323m & 3025m on the same road.
|
IRIDP-2
|
mehendiganj
|
506623003
|
1.57
|
|
|
56.97
|
M/S. Hasan Construction
|
48.87
|
02/03/2016
|
|
30/11/2016
|
100
|
|
|
03/04/2019
|
|
457
|
IRIDP-2/BRS/DW-37
|
(a)Improvement of road from Nasirkha Hat Khayaghat-Union Complex via Chilmari Sluice Gate (Ch. 00m-1870m.) (b) Construction of 03nos 0.625mx0.60m culvert at ch.832m,976m&1690 m on the same road.
|
IRIDP-2
|
mehendiganj
|
506625152
|
1.87
|
|
|
55.02
|
M/S. Hasan Construction
|
47.20
|
02/03/2016
|
|
30/12/2017
|
100
|
|
|
03/04/2019
|
|
458
|
IRIDP-2/BRS/DW-97
|
(a)Improvement of Laxmipur high school – Dakkin Laxmipur Lanch ghat via Laxmipur Rahman master bari, Mordon hawladar bari mosque gate , community clinic, joybangla bazar road.(Ch.00m - 4500m)(b) Construction of 01no 4.0mx4.0m culvert at ch.4500m on the same road.(a)Improvement of Mirdar hat GC-Nazirpur GCCR via Madrashar hat,Bangla Bazar road.(Ch.5580m - 6500m)(b) Construction of 01no 4.0mx4.0m culvert at ch.5580m on the same road.(c) Construction of 01no 2.0mx2.0m culvert at ch.6050m on the same road.
|
IRIDP-2
|
muladi
|
506692004
|
5.42
|
|
|
291.61
|
M/S. Dhara Enterprise
|
240.55
|
19/01/2017
|
|
28/08/2018
|
100
|
|
|
03/04/2019
|
|
459
|
IRIDP-2/BRS/SDW-159
|
(a)Improvement of Jamdder bari - Akoter hat via Bahadurpur H/S (K).road (Ch.00m - 1300m) ID NO 506695025(b)Construction of 01no 2.0mx2.0m culvert at ch.2269m on the same road.
|
IRIDP-2
|
muladi
|
506695025
|
1.30
|
|
|
88.22
|
Orient Trading & Builders LTD.
|
79.39
|
10/09/2017
|
|
28/11/2018
|
100
|
|
|
03/04/2019
|
|
460
|
IRIDP-2/BRS/DW-163
|
Improvement of Yousaf Ali Khan bari-Sholaghar Tozom Ali bari (C). road (Ch.00m - 510m) ID NO 506695012
|
IRIDP-2
|
muladi
|
506695012
|
0.51
|
|
|
16.23
|
Md. Khair Hossain
|
15.62
|
20/12/2017
|
|
02/04/2018
|
100
|
|
|
03/04/2019
|
|
461
|
IRIDP-2/BRS/DW-155
|
(a)Improvement of Char Malia Beparir Hat - Kaetmara GPS - Sherajul haq Bhuyan bari Charkalekhan UP UNR road (Ch.1350m - 1950m) ID NO 506694095(b)Construction of 01no 4.0mx4.0m culvert at ch.1650m on the same road.
|
IRIDP-2
|
muladi
|
506694095
|
0.60
|
|
|
45.67
|
Orient Trading & Builders LTD.
|
41.10
|
10/09/2017
|
|
10/03/2019
|
100
|
|
|
03/04/2019
|
|
462
|
IRIDP-2/BRS/DW-156
|
Improvement of Khasher Hat - Repotar Khan Kabir bari via Bangla bazar(M).road (Ch.3900m - 4410m) ID NO 506694003
|
IRIDP-2
|
muladi
|
506694003
|
0.51
|
|
|
27.55
|
M/S. Monalisa
|
27.55
|
11/09/2017
|
|
28/02/2019
|
100
|
|
|
03/04/2019
|
|
463
|
IRIDP-2/BRS/DW-161
|
Improvement of Talukdar(Khajurtala) Hat to Poyeaka Rastom Fokir bari via Ali Sikder bari bridge(G).road (Ch.1800m - 3500m) ID NO 506694016
|
IRIDP-2
|
muladi
|
506694016
|
1.70
|
|
|
100.32
|
Orient Trading & Builders LTD.
|
90.29
|
06/12/2017
|
|
28/02/2019
|
100
|
|
|
03/04/2019
|
|
464
|
IRIDP-2/BRS/DW-164
|
(a) Improvement of Laxmipur H/S -Near Bridge Kaitmara Registry School road (Ch.00m - 1000m) ID NO 506694030(b)Construction of 01no 1.30mx1.30m culvert at ch.380m on the same road.
|
IRIDP-2
|
muladi
|
506694030
|
1.00
|
|
|
34.43
|
M/S Amir Engineering corporation
|
30.99
|
17/12/2017
|
|
28/02/2019
|
100
|
|
|
03/04/2019
|
|
465
|
IRIDP-2/BRS/DW-94
|
(a)Improvement of Kazir Char High School - Moddho Kazirchar Dakhil Madrasah at Kazir Char Union road.(Ch.00m - 1000m)(b)Construction of 01no 2.0mx2.0m culvert at ch.125m on the same road.
|
IRIDP-2
|
muladi
|
506694082
|
1.00
|
|
|
62.59
|
M/S. Dhara Enterprise
|
46.00
|
19/01/2017
|
|
30/10/2018
|
70
|
|
|
03/04/2019
|
|
466
|
IRIDP-2/BRS/DW-95
|
(a)Improvement of Talukder hat( khajurtala) - Safipur UP via Charkaleka UP baparir hat road.(Ch13850m -15050m)(b) Construction of 01no 4.0mx4.0m culvert at ch.14643.00m on the same road.
|
IRIDP-2
|
muladi
|
506693001
|
1.20
|
|
|
81.67
|
M/S. Dhara Enterprise
|
60.44
|
19/01/2017
|
|
30/11/2018
|
70
|
|
|
03/04/2019
|
|
467
|
IRIDP-2/BRS/DW-96
|
Improvement of Safipur UP-Montazpur Bazar- Dorgabari –Uttar char Padda GPS – Bhoai bazar road.(Ch.00m - 1550m)
|
IRIDP-2
|
muladi
|
506693010
|
1.55
|
|
|
89.27
|
M/S. Dhara Enterprise
|
66.05
|
19/01/2017
|
|
30/10/2018
|
70
|
|
|
03/04/2019
|
|
468
|
IRIDP-2/BRS/DW-154
|
(a)Improvement of Boalia Natun hat - West Boalia GPS - Taleb kari Moydan bridge (S).road (Ch.150m - 1150m) ID NO 506694028(b)Construction of 01no 1.3mx1.30m culvert at ch.480m on the same road.
|
IRIDP-2
|
muladi
|
506694028
|
1.00
|
|
|
59.48
|
M/S. Serajul Alam Sikder
|
53.53
|
30/08/2017
|
|
18/04/2019
|
70
|
|
|
03/04/2019
|
|
469
|
IRIDP-2/BRS/DW-162
|
(a)Improvement of Char Malia Beparir Hat - Kaetmara GPS - Sherajul haq Bhuyan bari Charkalekhan UP UNR .road (Ch.00m - 1350m) ID NO 506694095(b)Construction of 01no 1.30mx1.30m culvert at ch.400m on the same road.(c)Construction of 01no 3.0mx3.0m culvert at ch.500m on the same road.
|
IRIDP-2
|
muladi
|
506694095
|
1.35
|
|
|
55.27
|
M/S Amir Engineering corporation
|
49.74
|
17/12/2017
|
|
02/11/2018
|
90
|
|
|
03/04/2019
|
|
470
|
IRIDP-2/BRS/DW-186
|
(a)Improvement of Charkalekha UP - Mirder hat G.C.Via Nomokanda-Ekotar hat.road (Ch.2000m - 3078m) ID NO 506693007(b)Construction of 01no 4.0mx4.0m culvert at ch.1750m on the same road.(c)Construction of 02no 1.30mx1.30m culvert at ch.2005m &2310 on the same road.
|
IRIDP-2
|
muladi
|
506693007
|
1.08
|
|
|
78.79
|
M/S. Habib Sons
|
74.85
|
27/08/2018
|
|
04/06/2019
|
30
|
|
|
03/04/2019
|
|
471
|
IRIDP-2/BRS/DW-224
|
Improvement of Muladi Barak Master bari-Char Laxmipur Borro Moaidan (M)road (Ch.370m - 770m) ID NO 506695045
|
IRIDP-2
|
muladi
|
506695045
|
0.40
|
|
|
17.60
|
M/S. Momin Enterprise
|
16.72
|
10/02/2019
|
|
17/07/2019
|
10
|
|
|
03/04/2019
|
|
472
|
IRIDP-2/BRS/DW-225
|
Improvement of Chilmari Kowsar Sader bari-M P hat via Rasid Khan bari(N-B).road (Ch.00m - 1724m) ID NO 506694031
|
IRIDP-2
|
muladi
|
506694031
|
1.72
|
|
|
72.55
|
M/S. Rahat Enterprise
|
68.92
|
18/02/2019
|
|
25/11/2019
|
20
|
|
|
03/04/2019
|
|
473
|
IRIDP-2/BRS/DW-10
|
Improvement of road from Mirdar hat GC-Nazirpur GC via Madrashar hat, Bangla Bazar at Ch. 7500 - 10350 m (Starting Banimordan Hat -MP hat)
|
IRIDP-2
|
muladi
|
|
2.85
|
|
|
113.63
|
M/S. Lutful Kabir
|
99.42
|
|
14/03/2016
|
13/12/2016
|
100
|
|
|
|
|
474
|
IRIDP-2/BRS/DW-11
|
(a) Improvement of road from Talukder hat (Khajurtala) to Safipur UP via Charkalakhan UP-Beparirhat (Ch. 2850-5750m) (b) Construction of 01no 3.0mx3.0m culvert at ch.5112m on the same road. (c) Construction of 03nos 1.3mx1.3m culvert at ch. 3580m, 4050m &
|
IRIDP-2
|
muladi
|
|
2.90
|
|
|
183.91
|
M/S. Alvi Construction
|
146.33
|
|
04/03/2016
|
02/12/2016
|
100
|
|
|
|
|
475
|
IRIDP-2/BRS/DW-208
|
(a)Improvement of Narayanpur-Nitayandi road (Ch.00m - 1000m) ID NO 506945039(b)Construction of 02no 0.625mx0.60m culvert at ch.250m,455m on the same road.
|
IRIDP-2
|
uzirpur
|
506945039
|
1.00
|
|
|
71.76
|
M/S. Sardar Trading
|
68.18
|
04/11/2018
|
|
11/07/2019
|
0
|
|
|
03/04/2019
|
|
476
|
IRIDP-2/BRS/DW-209
|
Improvement of Mulpain – Hostisundo road (Ch.1000m - 2013m) ID NO 506945243
|
IRIDP-2
|
uzirpur
|
506945243
|
1.01
|
|
|
65.12
|
M/S. Sikder Construction
|
61.87
|
30/09/2018
|
|
07/06/2019
|
0
|
|
|
03/04/2019
|
|
477
|
IRIDP-2/BRS/DW-210
|
Improvement of Satla GC (Akota Bazar) - Kandi R&H road (Ch.00m - 180m) ID NO 506942006
|
IRIDP-2
|
uzirpur
|
506942006
|
0.18
|
|
|
15.33
|
M/S. Sadia Enterprise
|
14.56
|
30/09/2018
|
|
03/04/2019
|
5
|
|
|
03/04/2019
|
|
478
|
IRIDP-2/BRS/DW-211
|
Improvement of Otra Raster matha Bazar - Jugirkanda Gala Hat road (Ch.00m - 810m) ID NO 506945216
|
IRIDP-2
|
uzirpur
|
506945216
|
0.81
|
|
|
48.29
|
M/S. Saira Enterprise
|
45.87
|
01/10/2018
|
|
08/04/2019
|
30
|
|
|
03/04/2019
|
|
479
|
IRIDP-2/BRS/DW-212
|
(a)Improvement of Boharkati H/O Akkas Molla - Uzirpur Dhamura road Battola Steel bridge. Road .(Ch.00m - 640m) ID NO 506945203(b)Construction of 01no 0.625mx0.60m culvert at ch.425m on the same road.
|
IRIDP-2
|
uzirpur
|
506945203
|
0.64
|
|
|
30.14
|
M/S. Sardar Trading
|
28.63
|
30/09/2018
|
|
07/04/2019
|
0
|
|
|
03/04/2019
|
|
480
|
IRIDP-2/BRS/DW-213
|
(a)Improvement of Ballabpur - H/O Rashid Molla- Bairkathi - Tatipara GPS Road .(Ch.500m - 1050m) ID NO 506945237(b)Construction of 01no 3.0mx3.0m culvert at ch.630m on the same road.
|
IRIDP-2
|
uzirpur
|
506945237
|
0.55
|
|
|
44.61
|
M/S. Habib Sons
|
42.38
|
04/11/2018
|
|
11/05/2019
|
0
|
|
|
03/04/2019
|
|
481
|
IRIDP-2/BRS/MW-214
|
Maintenance of Uzirpur UZ HQ - Daserhat Kheyaghat - Narayanpur R&H road (Ch.00m - 1000m)
|
IRIDP-2
|
uzirpur
|
506942020
|
1.00
|
|
|
33.95
|
M/S. Ferdousi Construction
|
32.25
|
09/10/2019
|
|
16/02/2019
|
20
|
|
|
03/04/2019
|
|
482
|
IRIDP-2/BRS/SDW-221
|
a) Improvenment of Baherghat H/O Jahirul Master towards northroad (Ch.00m-480m) ID NO 506945287b) Construction of 01 no 3.0mx3.0m culvert at ch. 280m on the same road(b) Construction of 1no 0.625mx0.60m culvert at ch.195m on the same road.
|
IRIDP-2
|
uzirpur
|
506945287
|
0.48
|
|
|
43.17
|
M/S. Mitro & Co.
|
41.01
|
22/10/2018
|
|
29/04/2019
|
10
|
|
|
03/04/2019
|
|
483
|
IRIDP-2/BRS/SDW-226
|
(a) Improvement Gazirpar Kader Market – Ohab Master House (Barakhota – Gazirpar) Road (Ch.00m - 600m) ID NO 506945017(b)Construction of 02no 0.625mx0.60m culvert at ch.205m,465m on the same road.
|
IRIDP-2
|
uzirpur
|
506945017
|
0.60
|
|
|
47.59
|
M/S. Warisha Enterprise
|
45.21
|
17/02/2019
|
|
24/08/2019
|
20
|
|
|
03/04/2019
|
|
484
|
IRIDP-2/BRS/DW-16
|
Improvement of road from Kalir Bazar GC-Barisal-dhaka NHW-GC School (Kalir Bazar GC-Barisal-Dhaka NHW, Shikerpur) at Ch. 1254m-1754m.
|
IRIDP-2
|
uzirpur
|
506942015
|
0.50
|
|
|
37.07
|
M/S. Mitro & Co.
|
28.49
|
07/04/2016
|
|
30/12/2016
|
100
|
|
|
02/04/2019
|
|
485
|
IRIDP-2/BRS/DW-17
|
Improvement of road from Dhamura GC-Satla GC via Ramerkathi-Muribari at Ch. 4930m-5430m.
|
IRIDP-2
|
uzirpur
|
506943009
|
0.50
|
|
|
39.97
|
M/S. Mitro & Co.
|
32.07
|
07/04/2016
|
|
30/03/2017
|
100
|
|
|
02/04/2019
|
|
486
|
IRIDP-2/BRS/DW-19
|
(a) Improvement of road from Kuchiarpar Wabda-Jamirbari GPS Road (Kuchiarpar GCCR to North Kalvila Road) at Ch. 00m-500m (b) Construction of 01no 0.625mx0.60m culvert at ch.210m on the same road
|
IRIDP-2
|
uzirpur
|
506945123
|
0.50
|
|
|
33.97
|
M/S. Talukder Enterprise
|
26.82
|
11/04/2016
|
|
18/11/2016
|
100
|
|
|
02/04/2019
|
|
487
|
IRIDP-2/BRS/DW-78
|
Improvement Of Dhamra GC (kacha Bazar) - Harta GC- Satla GC - Paisarhat GC Road (Ch.25950m - 27400m)
|
IRIDP-2
|
uzirpur
|
506942004
|
1.45
|
|
|
90.32
|
M/S. Lutful Kabir
|
69.38
|
02/02/2017
|
|
30/05/2018
|
100
|
|
|
02/04/2019
|
|
488
|
IRIDP-2/BRS/DW-79
|
(a)Improvement Chawdhury hat - Malikanda Madrasha via Uzirpur satla Battala road (Ch.00m - 680m)(b) Construction of 01no 0.625mx0.60m culvert at ch.580m on the same
|
IRIDP-2
|
uzirpur
|
506945058
|
0.68
|
|
|
37.47
|
M/S. Mitro & Co.
|
27.93
|
06/03/2017
|
|
30/03/2018
|
100
|
|
|
02/04/2019
|
|
489
|
IRIDP-2/BRS/DW-82
|
(a)Improvement of Ideal College Panchagrame Ballobpur bridge - Bairkathi Jamtala school road.(Ch.00m - 500m)(b) Construction of 01no 0.625mx0.60m culvert at ch.330m on the same road.
|
IRIDP-2
|
uzirpur
|
506945237
|
0.50
|
|
|
27.06
|
M/S. Sarfuddin Trading & Co
|
20.63
|
01/03/2017
|
|
24/11/2018
|
100
|
|
|
02/04/2019
|
|
490
|
IRIDP-2/BRS/DW-84
|
(a)Improvement of Joysree bazar-Sattar Dhalir shop - Bharshakati Cyclone shelter road.(Ch.00m - 1050m)(b) Construction of 01no 0.625mx0.60m culvert at ch.809m on the same road.
|
IRIDP-2
|
uzirpur
|
506945209
|
1.05
|
|
|
54.05
|
M/S. Talukder Enterprise
|
40.98
|
02/03/2017
|
|
30/11/2018
|
100
|
|
|
02/04/2019
|
|
491
|
IRIDP-2/BRS/MW-215
|
Maintenance of Otra UP (Habibpur) - Munshirtaluk - Kuralia Bazar road (Ch.00m - 2068m) ID NO 506943003
|
IRIDP-2
|
uzirpur
|
506943003
|
2.06
|
|
|
48.57
|
M/S. Ferdousi Construction
|
46.14
|
01/11/2018
|
|
28/02/2019
|
100
|
|
|
02/04/2019
|
|
492
|
IRIDP-2/BRS/DW-18
|
Improvement of road from Uzirpur H/Q - Bamrail UP Office - Ghandeshor Bazar at Ch. 4120m-4720
|
IRIDP-2
|
uzirpur
|
506943007
|
0.60
|
|
|
35.69
|
Md. Sirajul Islam Hanif
|
27.53
|
04/04/2016
|
|
30/07/2018
|
65
|
|
|
02/04/2019
|
|
493
|
IRIDP-2/BRS/DW-80
|
(a)Improvement of Habibpur Talimul Quran madrasha - Habibpur Hindupara Sarbojanin kalimondir road (Ch.00m - 780m)(b) Construction of 01no 0.625mx0.60m culvert at ch.400m on the same road.
|
IRIDP-2
|
uzirpur
|
506945210
|
0.78
|
|
|
42.99
|
M/S. Mitro & Co.
|
32.99
|
06/03/2017
|
|
28/02/2018
|
75
|
|
|
02/04/2019
|
|
494
|
IRIDP-2/BRS/DW-81
|
(a)Improvement of Agailjara Border (Datrabad) - Sholok Hazi M.A. Rashid Secondery School road.(Ch.00m - 650m)(b) Construction of 02no 0.625mx0.60m culvert at ch.115m& 330m on the same road. 2-Mar-17 2,854,591.82
|
IRIDP-2
|
uzirpur
|
506945214
|
0.65
|
|
|
34.92
|
M/S. Sharif Enterprise
|
28.54
|
02/03/2017
|
|
30/12/2018
|
60
|
|
|
02/04/2019
|
|
495
|
IRIDP-2/BRS/DW-83
|
(a)Improvement of Sanuhar - Atipara road.(Ch.00m - 900m)(b) Construction of 02no 0.625mx0.60m culvert at ch.212 & 545m on the same road.
|
IRIDP-2
|
uzirpur
|
506945087
|
0.90
|
|
|
45.99
|
M/S.Sharif Enterprise
|
37.59
|
02/03/2017
|
|
30/03/2018
|
60
|
|
|
02/04/2019
|
|
496
|
IRIDP-2/BRS/DW-85
|
(a)Improvement of Gojendro Wapda bridge- Ramerkathi Bayddo bari mondir road.(Ch.00m - 517m)(b) Construction of 01no 4.0mx4.0m culvert at ch.00m on the same road.
|
IRIDP-2
|
uzirpur
|
506945026
|
0.52
|
|
|
38.29
|
M/S. Mitro & Co.
|
29.24
|
06/03/2017
|
|
28/02/2018
|
45
|
|
|
02/04/2019
|
|
497
|
IRIDP-2/BRS/DW-86
|
(a)Improvement of Sikarpur RHD to mulpain Via Nurmohamad master house road.(Ch.00m - 1000m) link.150.0m(b) Construction of 03no 0.625mx0.60m culvert at ch.150m,340m&520m on the same road.
|
IRIDP-2
|
uzirpur
|
506945105
|
1.15
|
|
|
56.83
|
M/S. Sharif Enterprise
|
46.45
|
02/03/2017
|
|
04/12/2018
|
65
|
|
|
02/04/2019
|
|
498
|
IRIDP-2/BRS/DW-172
|
(a) Improvement of Mulpain Thakurhat - Uttar Sakral GPS - Norshingha Munshibari bridge - Sukragoda - Hawladerbari bridge - Barakota UP( Daberkul chowmohoni road) Road (Ch.4250m - 4850m) ID NO 506944095(b)Construction of 02no 0.625mx0.60m culvert at ch.4315m,4720m on the same road.
|
IRIDP-2
|
uzirpur
|
506944095
|
0.60
|
|
|
46.51
|
M/S. Kohinoor Enterprise
|
41.86
|
01/01/2018
|
|
18/05/2019
|
60
|
|
|
02/04/2019
|
|
499
|
IRIDP-2/BRS/DW-173
|
(a)Improvement of Bamrail-Boharkati road (Ch.00m - 1000m) ID NO 506944026(b)Construction of 04no 0.625mx0.90m culvert at ch.205m,305m,870m &920m on the same road.(c)Construction of 01no 4.0mx4.0m culvert at ch.12m on the same road.
|
IRIDP-2
|
uzirpur
|
506944026
|
1.00
|
|
|
82.53
|
M.M. Builders & Engineers LTD.
|
74.28
|
26/12/2017
|
|
18/02/2019
|
80
|
|
|
02/04/2019
|
|
500
|
IRIDP-2/BRS/DW-174
|
(a)Improvement of Goria Setla khola - Mugakathi Govt. Primary School road..(Ch.00m - 1020m) ID NO 506945261(b)Construction of 04no 0.625mx0.90m culvert at ch.103m,376m,580m &720m on the same road.(c)Construction of 01no 2.0mx2.0m culvert at ch.870m on the same road.
|
IRIDP-2
|
uzirpur
|
506945261
|
1.02
|
|
|
79.42
|
M.M. Builders & Engineers LTD.
|
71.48
|
26/12/2017
|
|
18/02/2019
|
40
|
|
|
02/04/2019
|
|
501
|
IRIDP-2/BRS/DW-15
|
(a) Improvement of road from Satla Bazar-Bagda Bazar Road (Satla H/S-Bagda Border) at Ch. 00m-539m. (b) Construction of 01no 4.0mx4.0m culvert at ch.5m on the same road.
|
IRIDP-2
|
uzirpur
|
|
0.54
|
|
|
43.61
|
M/S. Sadman Builders
|
34.23
|
|
11/04/2016
|
30/12/2016
|
100
|
|
|
|
|
502
|
MDSP-II-7-LPL-0-NW-01
|
Construction of 58 nos GPS cum Disaster Shelters with connecting Road
|
MDSP
|
barishal-s
|
|
44.20
|
|
|
29381.28
|
Navana Construction Ltd.
|
34500.14
|
|
11/12/2016
|
30/06/2021
|
95
|
|
|
28/02/2023
|
|
503
|
e-Tender/NBIDNNGPS/BAR/AGA/2017-2018/W1-00289
|
SOUTH EAST ASHKAR
|
NBIDNNGPS
|
agailjhara
|
|
|
|
|
78.43
|
M/S. Sharif Enterprise
|
82.31
|
|
26/08/2018
|
31/08/2019
|
30
|
|
|
|
|
504
|
e-Tender/NBIDNNGPS/BAR/AGA/2017-2018/W1-00290
|
PURBO BAG DHADAS PARA PRIMARY SCHOOL
|
NBIDNNGPS
|
agailjhara
|
|
|
|
|
70.51
|
M/S. sharif Enterprise
|
74.00
|
|
19/08/2018
|
19/08/2019
|
0
|
|
|
|
|
505
|
e-Tender/NBIDNNGPS/BAR/AGA/2017-2018/W1-01152
|
DOKKHIN ASKOR PRIMARY SCHOOL
|
NBIDNNGPS
|
agailjhara
|
|
|
|
|
74.46
|
M/S. Sharif Enterprise
|
78.15
|
|
30/05/2018
|
30/05/2019
|
45
|
|
|
|
|
506
|
e-Tender/NBIDNNGPS/BAR/AGA/2017-2018/W1-01155
|
UTTAR BARPAIKA PRIMARY SCHOOL
|
NBIDNNGPS
|
agailjhara
|
|
|
|
|
81.40
|
M/S. sharif Enterprise
|
85.43
|
|
06/06/2018
|
30/05/2019
|
55
|
|
|
|
|
507
|
e-Tender/NBIDNNGPS/BAR/BAB/2017-2018/W1-01140
|
UTTAR ROHOMOTPUR PRIMARY SCHOOL
|
NBIDNNGPS
|
babuganj
|
|
|
|
|
78.57
|
Md Jakir Hossain Mia
|
74.64
|
|
26/06/2018
|
25/06/2019
|
5
|
|
|
|
|
508
|
e-Tender/NBIDNNGPS/BAR/BAB/2017-2018/W1-01158
|
UTTAR BANGLA PRIMARY SCHOOL
|
NBIDNNGPS
|
babuganj
|
|
|
|
|
50.26
|
Rupali Construction
|
47.76
|
|
01/07/2018
|
30/06/2019
|
10
|
|
|
|
|
509
|
e-Tender/NBIDNNGPS/BAR/BAB/2017-2018/W1-01160
|
DOKKHIN VUTERDIYA ADORSO PRIMARY SCHOOL
|
NBIDNNGPS
|
babuganj
|
|
|
|
|
78.57
|
M/S Ferdousi construction
|
74.64
|
|
18/06/2018
|
18/06/2019
|
5
|
|
|
|
|
510
|
e-Tender/NBIDNNGPS/BAR/BAB/2017-2018/W1-01163
|
MAJHER CHAR NON GOVT PRIMARY SCHOOL
|
NBIDNNGPS
|
babuganj
|
|
|
|
|
70.51
|
Rupali Construction
|
66.99
|
|
01/07/2018
|
30/06/2019
|
25
|
|
|
|
|
511
|
e-Tender/NBIDNNGPS/BAR/BAB/2018-2019/W1-01161
|
POCHIM BAHERCHOR GOSHKATHI PRIMARY SCHOOL
|
NBIDNNGPS
|
babuganj
|
|
|
|
|
58.57
|
M/S Jagua Khan brothers
|
55.64
|
|
28/11/2018
|
27/08/2019
|
0
|
|
|
|
|
512
|
e-Tender/NBIDNNGPS/BAR/BAB/2018-2019/W1-02512
|
UTTAR VUTERDIA PRIMARY SCHOOL
|
NBIDNNGPS
|
babuganj
|
|
|
|
|
103.81
|
M/S Brommo Enterprise,Prop- Narayan Chandra
|
98.62
|
|
|
|
0
|
|
|
|
|
513
|
e-Tender/NBIDNNGPS/BAR/BAB/2018-2019/W1-02513
|
PURBO VUTERDIA NOBARUN PRIMARY SCHOOL
|
NBIDNNGPS
|
babuganj
|
|
|
|
|
62.38
|
M/S Parves Traders,Prop-Mainul Hossain Parves
|
59.26
|
|
|
|
0
|
|
|
|
|
514
|
e-Tender/NBIDNNGPS/BAR/BAB/2018-2019/W1-02514
|
PURBO KEDARPUR PRIMARY SCHOOL
|
NBIDNNGPS
|
babuganj
|
|
|
|
|
71.95
|
M/S Brommo Enterprise,Prop- Narayan Chandra
|
68.36
|
|
|
|
0
|
|
|
|
|
515
|
e-Tender/NBIDNNGPS/BAR/BAK/2017-2018/W1-00291
|
MOLLAPARA FARUQUE PRIMARY SCHOOL
|
NBIDNNGPS
|
babuganj
|
|
|
|
|
70.51
|
M/s Jagua Khan Brothers.
|
66.99
|
|
|
|
35
|
|
|
|
|
516
|
e-Tender/NBIDNNGPS/BAR/BAK/2017-2018/W1-01135
|
UTTAR KAZLA KATHI PRIMARY SCHOOL
|
NBIDNNGPS
|
babuganj
|
|
|
|
|
74.99
|
M/s Jagua Khan Brothers.
|
71.24
|
|
|
|
35
|
|
|
|
|
517
|
e-Tender/NBIDNNGPS/BAR/BAK/2017-2018/W1-01137
|
POCHIM DUDHOL PRIMARY SCHOOL
|
NBIDNNGPS
|
babuganj
|
|
|
|
|
53.30
|
M/s oshin Enterprise.
|
50.64
|
|
|
|
0
|
|
|
|
|
518
|
e-Tender/NBIDNNGPS/BAR/BAK/2017-2018/W1-01138
|
DOKKHIN NARANGOL PRIMARY SCHOOL
|
NBIDNNGPS
|
babuganj
|
|
|
|
|
92.63
|
M/s sikder and Sons.
|
88.00
|
|
|
|
30
|
|
|
|
|
519
|
e-Tender/NBIDNNGPS/BAR/BAN/2017-2018/W1-01133
|
DARIABAD PRIMARY SCHOOL
|
NBIDNNGPS
|
banaripara
|
|
|
|
|
83.60
|
M/S. SR Enterprise
|
79.42
|
|
29/05/2018
|
28/05/2019
|
0
|
|
|
|
|
520
|
e-Tender/NBIDNNGPS/BAR/BAN/2017-2018/W1-01144
|
CHIRAPARA SER- BANGAL PRIMARY SCHOOL
|
NBIDNNGPS
|
banaripara
|
|
|
|
|
79.05
|
M/S. Khan Store
|
75.10
|
|
10/07/2018
|
09/07/2019
|
0
|
|
|
|
|
521
|
e-Tender/NBIDNNGPS/BAR/BAN/2017-2018/W1-01145
|
WEST BAGHRA NGPS
|
NBIDNNGPS
|
banaripara
|
|
|
|
|
73.64
|
M/S. Mahi Enterprise
|
69.96
|
|
28/05/2018
|
28/05/2019
|
0
|
|
|
|
|
522
|
e-Tender/NBIDNNGPS/BAR/BAN/2017-2018/W1-01146
|
GHATAPARA PRIMARY SCHOOL
|
NBIDNNGPS
|
banaripara
|
|
|
|
|
83.32
|
M/S. Shovo Traders
|
79.15
|
|
28/05/2018
|
28/05/2019
|
10
|
|
|
|
|
523
|
e-Tender/NBIDNNGPS/BAR/BAN/2017-2018/W1-1143
|
UTTAR SYED KATHI PRIMARY SCHOOL
|
NBIDNNGPS
|
banaripara
|
|
|
|
|
82.53
|
M/S. Khan Store
|
78.41
|
|
10/07/2018
|
09/07/2019
|
10
|
|
|
|
|
524
|
e-Tender/NBIDNNGPS/BAR/BAR/2017-2018/W1-01187
|
PARCHAIM CHANDPURA CAMMUNITY PRIMARY SCHOOL
|
NBIDNNGPS
|
barishal-s
|
|
|
|
|
95.65
|
M/S. Nabil Enterprise
|
90.87
|
|
07/06/2018
|
09/06/2019
|
25
|
|
|
|
|
525
|
e-Tender/NBIDNNGPS/BAR/BAR/2017-2018/W1-01679
|
A. KADER KHAN PRIMARY SCHOOL
|
NBIDNNGPS
|
barishal-s
|
|
|
|
|
50.26
|
M/S. Desh Builders
|
47.75
|
|
21/05/2018
|
26/05/2019
|
40
|
|
|
|
|
526
|
e-Tender/NBIDNNGPS/BAR/BAR/2018-2019/W1-02331
|
DOKKHIN KORAPUR ADRSO PRIMARY SCHOOL
|
NBIDNNGPS
|
barishal-s
|
|
|
|
|
77.48
|
M/S Barisal Construction
|
73.61
|
|
|
|
0
|
|
|
|
|
527
|
e-Tender/NBIDNNGPS/BAR/MEH/2017-2018/W1-00038
|
POCHIM AZIMPUR PRIMARY SCHOOL
|
NBIDNNGPS
|
mehendiganj
|
|
|
|
|
78.43
|
M/S. Kohinoor Enterprise
|
70.59
|
|
11/04/2018
|
19/04/2019
|
82
|
|
|
|
|
528
|
e-Tender/NBIDNNGPS/BAR/MEH/2017-2018/W1-00039
|
SOLDI PRIMARY SCHOOL
|
NBIDNNGPS
|
mehendiganj
|
|
|
|
|
78.43
|
M/S. Mohiuddin Ahmed
|
70.59
|
|
04/04/2018
|
12/04/2019
|
72
|
|
|
|
|
529
|
e-Tender/NBIDNNGPS/BAR/MEH/2017-2018/W1-00040
|
MODDHO CHOR ROY PRIMARY SCHOOL
|
NBIDNNGPS
|
mehendiganj
|
|
|
|
|
78.43
|
M/S. Kohinoor Enterprise
|
70.59
|
|
04/04/2018
|
12/04/2019
|
85
|
|
|
|
|
530
|
e-Tender/NBIDNNGPS/BAR/MEH/2017-2018/W1-00041
|
BIDDANONDO PUR PRIMARY SCHOOL
|
NBIDNNGPS
|
mehendiganj
|
|
|
|
|
70.51
|
M/S. Kohinoor Enterprise
|
63.46
|
|
04/04/2018
|
12/04/2019
|
64
|
|
|
|
|
531
|
e-Tender/NBIDNNGPS/BAR/MEH/2017-2018/W1-00042
|
KOLISAR PAR PRIMARY SCHOOL
|
NBIDNNGPS
|
mehendiganj
|
|
|
|
|
78.43
|
M/S. Mohiuddin Ahmed
|
70.59
|
|
11/04/2018
|
19/04/2019
|
90
|
|
|
|
|
532
|
e-Tender/NBIDNNGPS/BAR/MEH/2017-2018/W1-00043
|
DOKKHIN JANGALIYA PRIMARY SCHOOL
|
NBIDNNGPS
|
mehendiganj
|
|
|
|
|
78.43
|
M/S. Apu Enterprise
|
23.39
|
|
10/09/2018
|
10/06/2019
|
0
|
|
|
|
|
533
|
e-Tender/NBIDNNGPS/BAR/MEH/2017-2018/W1-00044
|
CHOR POCHIM PRIMARY SCHOOL
|
NBIDNNGPS
|
mehendiganj
|
|
|
|
|
82.82
|
M/s A Ali & sons
|
78.68
|
|
01/11/2018
|
05/11/2019
|
20
|
|
|
|
|
534
|
e-Tender/NBIDNNGPS/BAR/MEH/2017-2018/W1-00045
|
ASOK ALI HALDER MEMORIYAL
|
NBIDNNGPS
|
mehendiganj
|
|
|
|
|
81.29
|
M/S. Mohiuddin Ahmed
|
73.17
|
|
04/04/2018
|
19/04/2019
|
90
|
|
|
|
|
535
|
e-Tender/NBIDNNGPS/BAR/MEH/2017-2018/W1-00046
|
MODDHO CHANPUR PRIMARY SCHOOL
|
NBIDNNGPS
|
mehendiganj
|
|
|
|
|
78.43
|
Md. Zakir Hossain Mia
|
23.39
|
|
10/09/2018
|
10/06/2019
|
0
|
|
|
|
|
536
|
e-Tender/NBIDNNGPS/BAR/MUL/2017-2018/W1-00294
|
UTTAR TEROCHOR PRIMARY SCHOOL
|
NBIDNNGPS
|
muladi
|
|
|
|
|
78.43
|
M/S Sirajul Alom Sikder
|
75.83
|
|
31/05/2018
|
31/05/2019
|
5
|
|
|
|
|
537
|
e-Tender/NBIDNNGPS/BAR/MUL/2017-2018/W1-01190
|
PAIKPARA PRIMARY SCHOOL
|
NBIDNNGPS
|
muladi
|
|
|
|
|
84.76
|
M/S Mezba Construction
|
80.52
|
|
30/05/2018
|
31/05/2019
|
15
|
|
|
|
|
538
|
RERMP-3/BA RIS/W-27
|
Maintenance of Rural
Roads Barisal()
|
RERMP-3
|
barishal-s
|
N/A
|
|
|
36
|
3175.50
|
N/A
|
3175.50
|
|
|
|
40
|
1146.00
|
36
|
26/12/2021
|
|
539
|
SP14200/Chandrapara FCD Subproject
|
Chandrapara khal re-excavation(ch.00-3340m) Baka khal re-excavation(ch.00-1020m) Mushuria branch khal re-excavation(ch.00-990m) Referenced line section(5 Nos.) Chandrapara Embankment re-sectioning(ch.1300-2914m)
|
SSSWRDP
|
babuganj
|
|
|
6.96
|
100
|
88.01
|
LCS parveen begum
|
88.01
|
29/04/2018
|
02/04/2018
|
30/04/2019
|
100
|
87.20
|
100
|
30/11/2022
|
|
540
|
SP25314/Madhabpasa Subproject
|
Uttar Lafadi khal re-excavation(ch.00-3500m) Birpasha khal re-excavation(ch.00-950m) Sultan master barir khal re-excavation(ch.00-2200m) Referenced line section(9 Nos.) Bamboo bridge(11 Nos.) Shibbari Khal re-xcavation (Ch:0.00m - 2760.00m) 2023-24 Badamtali Khal re-xcavation (Ch:0.00m - 2300.00m) 2023-24 Kashaghata Khal re-xcavation (Ch:0.00m - 1500.00m) 2023-24 Kalikhala Khal re-xcavation (Ch:0.00m - 1260.00m) 2023-24 Const. of 10 Nos. Ref. lined Section on 04 Khals, SP Identf. sign board 2, SP Area Indication Post 2 Nos. | 2023-24
|
SSSWRDP
|
babuganj
|
|
|
14.47
|
83
|
171.88
|
zayeda begum
|
171.88
|
20/03/2024
|
31/03/2024
|
30/04/2024
|
79
|
143.16
|
83
|
30/11/2022
|
|
541
|
SP43043/Dehergati Subproject
|
Vuter Khal Re-excavation (Ch: 0.00 - 4600 m) Mullar Khal Re-excavation (Ch: 0.00 - 2860 m) Reference Lined Section (8 nos.) + SP Identification Signboard (2 nos.) Purba Rabindranagar Khal re-xcavation (Ch:0.00m - 2540m) 2023-24 Kalibari Khal re-xcavation (Ch:0.00m - 1280m) 2023-24 Chairman Bari Khal re-xcavation (Ch:0.00m - 1260m) 2023-24 Nomarjhuri Khal re-xcavation (Ch:0.00m - 1880m) 2023-24 Daragabari Khal re-xcavation (Ch:0.00m - 1500m) 2023-24 Chairman Bari Branch Khal re-xcavation (Ch:0.00m - 1080m) 2023-24 Const. of 11 Nos. Ref. lined Section on 06 Khals, SP Identf. sign board 2, SP Area Indication Post 2 Nos.| 2023-24
|
SSSWRDP
|
babuganj
|
|
|
16.96
|
76
|
113.75
|
LCS
|
113.75
|
12/03/2024
|
25/03/2024
|
30/04/2024
|
79
|
87.45
|
76
|
30/11/2022
|
|
542
|
SP44081/Thakur Mollik Subproject
|
Re-excavation of Maniruddin Khal (Ch: 0.00 - 1170 m) Re-excavation of Char Hogal Patia Khal (Ch: 0.00 - 1340 m) Re-excavation of Padar Barir Khal (Ch: 0.00 - 700 m) Re-excavation of Sarishar Khal (Ch: 0.00 - 900 m) Re-excavation of Silandia Khal (Ch: 0.00 - 1570 m) Maintenance of WMCA Office, Ref Line Section (10 nos.) and SP Signboard (2 nos.) -
|
SSSWRDP
|
babuganj
|
|
|
5.68
|
85
|
46.72
|
Shahin & Jahanara
|
46.72
|
28/10/2020
|
01/12/2020
|
30/04/2021
|
100
|
39.99
|
85
|
30/11/2022
|
|
543
|
SP45150/Chandpasha Subproject
|
Re-excavation of Daria badh Khal (Ch: 0 m - 2200 m) Re-excavation of Kolatola Khal (Ch: 0 m - 1150 m) Re-excavation of Molla barir Khal (Ch: 0 m - 1050 m) Re-excavation of Napit barir Khal (Ch: 0 m - 900 m) Re-excavation of Khan bari hota Khal (Ch: 0 m - 700 m) Ref lined Section (13nos.) and SP Signboard (2nos.)
|
SSSWRDP
|
babuganj
|
|
|
6.00
|
96
|
56.01
|
LCS
|
56.01
|
19/11/2020
|
18/01/2021
|
30/04/2021
|
100
|
54.20
|
96
|
30/11/2022
|
|
544
|
SP62051/BaherChar Khudrakathi Subproject
|
Re-excavation of Amtalir Khal (Ch. 0+000 to Ch. 1+630 km) Re-excavation of Moragangir Khal (Ch. 0+000 to Ch. 2+350 km). Re-excavation of Madartola Khal (Ch. 0+000 to Ch. 1+300 km). Re-excavation of Sadhukathi Khal (Ch. 0+000 to Ch. 1+200m). Re-excavation of Sadhukathi Br. Khal (Ch. 0+000 to Ch. 0+300m). Const. of 7 Nos. Ref. lined Section on 5 Khals, SP Identf. sign board 2 Nos., Demercation Post 12 Nos. and SP Indication Post 2 Nos. Const. of Culvert (2V-4.0m X 4.0m) on Moragangir Khal Const. of WMCA office (12.0mx6.0m)
|
SSSWRDP
|
babuganj
|
|
|
6.78
|
82
|
164.06
|
M/S S H Enterprise
|
159.14
|
27/03/2023
|
30/03/2023
|
31/05/2023
|
82
|
131.15
|
82
|
30/11/2022
|
|
545
|
SP62052/Rakudia Subproject
|
Re-excavation of Bangla Kata Khal (Ch. 0+000 to Ch. 1+460 km) Re-excavation of Kalir Bazar Khal (Ch. 0+000 to Ch. 0+400 km). Re-excavation of Mominuddir Khal (Ch. 0+000 to Ch. 0+705 km) Re-excavation of Mominuddir Br. Khal (Ch. 0+000 to Ch. 0+732 km). Re-excavation of Narayan Dasher Khal (Ch. 0+000 to Ch. 0+595m) Re-excavation of Nurdir Khal (Ch. 0+000 to Ch. 1+866m) Re-excavation of Rakudia Sluice Gate Khal (Ch. 0+000 to Ch. 1+625m) Re-excavation of Yasiner Khal (Ch. 0+000 to Ch. 0+880m) Const. of 11 Nos. Reference lined Section on 8 Khals, SP Identf. sign board 2 Nos., Demercation Post 48 Nos. and SP Indication Post 2 Nos. Const. of WMCA office (12.00mx6.00m)
|
SSSWRDP
|
babuganj
|
|
|
8.26
|
82
|
131.09
|
M/S S H Enterprise
|
128.74
|
27/03/2023
|
27/04/2023
|
31/05/2023
|
90
|
105.72
|
82
|
30/11/2022
|
|
546
|
SP24133/Padrishibpur Subproject
|
Mollar Danga Branch Khal Re-excavation(ch0.00-2200m) Sundor Khali Khal Re-excavation(ch0.00-1900m) Andar Manik Khal Re-excavation(ch0.00-1320m) Sundor Khali Brach Khal Re-excavation(ch0.00-525m) Referenced Line Section(10nos), Subproject Identification signboard (2nos.) Construction of WMCA Building (Semi pacca)
|
SSSWRDP
|
bakerganj
|
|
|
5.94
|
94
|
81.12
|
LCS
|
79.03
|
25/03/2020
|
21/01/2021
|
30/04/2021
|
100
|
74.63
|
94
|
30/11/2022
|
|
547
|
SP61024/Boalia Bakhorkathi Subproject
|
Re-excavation of Sonamukhi Khal (Ch-1+000km to 1+530km) Re-excavation of Jugibari Khal (Ch-1+000km to 1+500km) Re-excavation of Napitbari Khal (Ch-0+000km to 1+772km) Ref. Lined Section 2 Nos. On 3 Khals, And SP Identf. Signboard 2 Nos. Construction of Sonamukhi Khal Regulator (1V-1.50m X1.80m) at Ch. 0+145km of Khal Construction of Jugibari Khal Regulator (1V-1.50m X 1.80m) at Ch. 0+215km of Khal Construction of Napitbari Khal Regulator (1V-1.50 m X 1.50m) at Ch.0+450Km of Khal Construction of WMCA office
|
SSSWRDP
|
bakerganj
|
|
|
2.80
|
72
|
237.85
|
M/S Mohiuddin Ahmed
|
216.27
|
07/03/2022
|
21/07/2022
|
30/04/2023
|
82
|
157.16
|
72
|
30/11/2022
|
|
548
|
SP14123/Niamati FCD Subproject
|
Rehabilitation of Niamati Khal Regulator at ch.310m Embankment Rehabilitation of Matiadubi Khal Regulator at ch.5800m Embankment Rehabilitation of Tengrakhali Khal Regulator at ch.6300m Embankment Rehabilitation of Samaddar Khal Regulator at ch.36600m Embankment.
|
SSSWRDP
|
bakerganj
|
|
|
0.00
|
0
|
32.29
|
OTM
|
29.06
|
05/11/2023
|
16/01/2024
|
15/07/2024
|
0
|
0.00
|
0
|
30/11/2022
|
|
549
|
SP15294/Kabai FCD Subproject
|
Kathalbari Khal re-xcavation (Ch:0.00m - 1250m) Hariram Khal re-xcavation (Ch:0.00m - 5930m) Kabai Embankment re-sectioning(ch: 9.720 - 11170m) Const. of 09 Nos. Ref. lined Section on 02 Khals, SP Identf. sign board 2, SP Area Indication Post 2 Nos.
|
SSSWRDP
|
bakerganj
|
|
|
8.63
|
45
|
74.76
|
LCS
|
74.81
|
14/03/2024
|
24/04/2024
|
31/05/2024
|
62
|
33.97
|
45
|
30/11/2022
|
|
550
|
SP44097/Dudhal Subproject
|
Beg Barir Khal re-excavation (Ch:0.00-1500m) Jele Barir Khal re-excavation (Ch:0.00-1100m) Gani Hawladar Barir Khal re-excavation (Ch:0.00-500m) Hawladar Barir Khal re-excavation (Ch:0.00-370m) Const. of 04 Nos. Ref. lined Section on 4 Khals, SP Identf. sign board 2, SP Indication Post 2 Nos. Dudhal Embankment re-sectioning (Ch:0.00 - 3750m) 2020-23
|
SSSWRDP
|
bakerganj
|
|
|
7.22
|
62
|
79.42
|
LCS
|
79.42
|
13/11/2023
|
03/04/2024
|
30/04/2024
|
96
|
49.48
|
62
|
30/11/2022
|
|
551
|
SP22020/Kachua Subproject
|
Re-excavation of Baishari khal (Ch: 0.00 - 2540 m) Re-excavation of Kachua khal (Ch: 0.00 - 1320 m) Re-excavation of Kachua Branch khal (Ch: 0.00 - 500 m) Re-excavation of Sabuj Biplob khal (Ch: 0.00 - 1670 m) and Provisional Sum. Reference Lined Section (7 nos.) and SP Identification Signboard (2 nos.) Construction of WMCA Building (Semi pacca)
|
SSSWRDP
|
banaripara
|
|
|
6.03
|
93
|
83.45
|
LCS omor ali
|
80.80
|
16/02/2020
|
21/01/2021
|
30/04/2020
|
100
|
75.34
|
93
|
30/11/2022
|
|
552
|
SP22041/Jambudwip Subproject
|
Re-excavation of Machrang Khal (Ch: 0.00 - 2230 m) Re-excavation of Rajjakpur Khal (Ch: 0.00 - 2180 m) Re-excavation of NapitBarir Khal (Ch: 0.00 - 1330 m) Re-excavation of Union Parishad Khal (Ch: 0.00 - 750 m) and Provisional Sum. Reference Lined Section (10 nos.) and SP Identification Signboard (2 nos.) Construction of WMCA Office (Semi pacca)
|
SSSWRDP
|
banaripara
|
|
|
6.49
|
94
|
79.69
|
LCS SOROYAR HOSSEN
|
76.94
|
09/03/2020
|
21/01/2021
|
31/12/2020
|
100
|
72.50
|
94
|
30/11/2022
|
|
553
|
SP44125/Chakhar Subproject
|
Re-exacavation of Chakhar Bazar khal (Ch-0+00km to 2+950km) Re-exacavation of Pashchim Chakhar Khal (Ch-0+000km to 1+00km) Re-exacavation of Chakhar College khal (Ch-0+000km to 0+580km) Re-exacavation of Doctor Barir khal (Ch-0+000km to 0+350km) Re-exacavation of U P khal (Ch-0+000km to 0+400km) Ref. Lined Section 08 Nos. On 5 Khals, And SP Identf. Signboard (2 nos.) Construction of WMCA office building
|
SSSWRDP
|
banaripara
|
|
|
5.28
|
41
|
64.10
|
S H Enterprise
|
63.61
|
25/01/2022
|
10/02/2022
|
30/04/2022
|
83
|
26.17
|
41
|
30/11/2022
|
|
554
|
SP61002/Char Icha Subproject
|
Re-excavation of Mora Nadi (Ch. 2+200Km to 5+850Km) Re-excavation of Mukshiganjer Khal (Ch. 0+000Km to 2+670Km) Re-excavation of Chand Kati Khal (Ch. 0+000Km to 0+570Km) Re-excavation of Char Icha Varanir Khal (Ch. 0+000Km to 1+030Km) Re-excavation of Jiler Khal (Ch. 0+000Km to 2+100Km) Re-excavation of Jiler Branch-1 Khal (Ch. 0+000Km to 0+660Km) Re-excavation of Jiler Branch-2 Khal (Ch. 0+000Km to 1+475Km) Re-excavation of Karna Kati Khal (Ch. 0+900Km to 2+160Km) Construction of Reference Lined sections ( 14 Nos. ), Provisional Sum Construction of Bamboo bridge (14 Nos. ), Sub-Project Identification Signboard Construction of WMCA Building (Semi pacca)
|
SSSWRDP
|
barishal-s
|
|
|
13.41
|
91
|
152.52
|
S H Enterprise
|
150.39
|
06/08/2020
|
19/06/2022
|
30/04/2022
|
100
|
138.34
|
91
|
30/11/2022
|
|
555
|
SP44111/Kasipur Subproject
|
Tulatala Khal re-excavation (Ch:0.00 - 1950m) Sharshi Khal re-excavation (Ch:0.00 - 1600m) Sharshi Branch Khal re-excavation (Ch:0.00 - 1170m) Magorpara Khal re-excavation (Ch:0.00 - 1330m) Const. of 09 Nos. Ref. lined Section on 4 Khals, SP Identf. sign board 2, SP Area Indication Post 2 Nos.
|
SSSWRDP
|
barishal-s
|
|
|
6.05
|
34
|
54.35
|
LCS
|
54.35
|
17/01/2024
|
16/03/2024
|
30/04/2024
|
50
|
18.62
|
34
|
30/11/2022
|
|
556
|
SP62056/Tungi Baria Subproject
|
Memania Khal Re-Excavation from Ch. 0+900km to Ch. 7+168km with 1 Nos Fish Sanctury Ch.9m 1+700km) Kumar Barir Khal Re-Excavation from Ch. 0+200km to Ch. 4+038km Kanai Pura Khal Re-Excavation from Ch. 0+000km to Ch. 0+761km Const. of 13 Nos. Ref. lined Section on 03 Khals, SP Identf. sign board 2, SP Area Indication Post 2 Nos. Const. of WMCA office
|
SSSWRDP
|
barishal-s
|
|
|
10.86
|
0
|
128.69
|
OTM
|
128.69
|
01/01/1900
|
|
|
0
|
0.00
|
0
|
30/11/2022
|
|
557
|
SP15306/Mahilara FCD Subproject
|
Lebutoli khal re-excavation(ch.00-3500m) Mahilara embankment re-sectioning(ch.6600-10900m) Referenced line section(4 Nos.) Bamboo Bridge(3 Nos.) Sharifabad Khal re-xcavation (Ch:0.00m - 2450m) 2023-24 Char Diyashur Khal re-xcavation (Ch:0.00m - 1600m) 2023-24 Ramzanpur Khal re-xcavation (Ch:0.00m - 1950m) 2023-24 Ramzanpur Branch Khal re-xcavation (Ch:0.00m - 800m) 2023-24 Const. of 04 Nos. Ref. lined Section on 04 Khals, SP Identf. sign board 2, SP Area Indication Post 2 Nos. | 2023-24 Construction of WMCA Office
|
SSSWRDP
|
gouranadi
|
|
|
14.60
|
64
|
185.72
|
Sorowar Sarder
|
185.71
|
19/03/2019
|
31/03/2019
|
30/04/2024
|
50
|
120.17
|
64
|
30/11/2022
|
|
558
|
SP15307/Sarikal FCD Subproject
|
Char sarikal khal re-excavation(ch.00-1600m) Maddha Hasnabad khal re-excavation(ch.00-1400m) Patur khal re-excavation(ch.00-1600m) Referenced line section(5 Nos.) Bamboo bridge(3 Nos.) Embankment re-sectioning(ch.00-1200m) WMCA office & Irrigation Canal Hasnabad Khal re-xcavation (Ch:2500.00m - 3300.00m) 2023-24 Nalgura AB Khal re-xcavation (Ch:0.00m - 4500.00m) 2023-24 Const. of 07 Nos. Ref. lined Section on 02 Khals, SP Identf. sign board 2, SP Area Indication Post 2 Nos. | 2023-24
|
SSSWRDP
|
gouranadi
|
|
|
11.10
|
79
|
173.44
|
OTM
|
175.09
|
16/10/2018
|
20/11/2018
|
30/04/2024
|
92
|
140.06
|
79
|
30/11/2022
|
|
559
|
SP15308/Nalchira FCD Subproject
|
Gorangal khal re-excavation(ch.00-6200m) Referenced line section(6 Nos.) Bamboo bridge (6 Nos.) WMCA Office
|
SSSWRDP
|
gouranadi
|
|
|
6.20
|
92
|
130.66
|
M/S Mega Ripa Enterprise
|
131.70
|
16/10/2018
|
14/07/2019
|
30/04/2019
|
100
|
121.62
|
92
|
30/11/2022
|
|
560
|
SP61006/Hosnabad Subproject
|
Re-exacavation of Kurir Char Khal (Ch-0+000km to 3+300km) Re-exacavation of Paschim Kurir Char Khal (Ch 0+000km to 3+310km) Re-exacavation of Miar Char khal (Ch-0+800km to 3+000km) Re-exacavation of Miar Char Branch khal (Ch 0+000km to 1+900km) Construction of 10 Nos. Reference Lined sections and SP idenf. SB 2 No. Construction of WMCA office building.
|
SSSWRDP
|
gouranadi
|
|
|
10.71
|
95
|
151.71
|
Mother Engineering
|
152.83
|
19/12/2022
|
17/05/2022
|
30/04/2022
|
100
|
146.45
|
95
|
30/11/2022
|
|
561
|
SP13040/Chilmari FCD Subproject
|
Naktir Khal Re-excavation (Ch: 0 - 1700 m) Beparir Khal Re-excavation (Ch: 0 - 1800 m) Khal Bunia Khal Re-excavation (Ch: 0 - 1300 m) Chilmari Embankment Re-sectioning(1500m) Refferenced line section (6 Nos.) WMCA Office and Others
|
SSSWRDP
|
mehendiganj
|
|
|
6.30
|
96
|
114.49
|
salma akter
|
112.42
|
24/02/2019
|
07/08/2019
|
30/04/2019
|
100
|
108.68
|
96
|
30/11/2022
|
|
562
|
SP14171/Khajuria FCD Subproject
|
Char khajuria khal re-excavation(ch.00-2600m) Tulatoli khal re-excavation(ch.00-2300m) Majer khal re-excavation(ch.00-1700m) Referenced line section(6 Nos.) Bamboo bridge(1 Nos.) Embankment re-sectioning(ch.00-3200m) WMCA Office
|
SSSWRDP
|
mehendiganj
|
|
|
9.80
|
96
|
142.45
|
selim
|
141.79
|
27/09/2018
|
22/11/2018
|
30/04/2019
|
100
|
136.92
|
96
|
30/11/2022
|
|
563
|
SP61017/Kazirhat Subproject
|
Re-Sectioning of Kazirhat Embankment (ch.0+000km to 3+600km) Re-excavation of Kazirhat Khal (Ch-1+000km to 2+400km) Re-excavation of Kazirhat Branch-1 Khal (Ch-0+000km to 1+850km) Re-excavation of Kazirhat Branch-2 Khal (Ch-0+000km to 1+500km) Re-excavation of Kazirhat Branch-3 Khal (Ch-0+200km to 1+825km) Re-excavation of Kazirhat Branch-4 Khal (Ch-0+000km to 1+585km) Re-excavation of Kataltali khal (Ch-2+800km to 4+620km) Re-excavation of Kataltali Branch khal (Ch-0+000km to 0+600km) Re-excavation of Masjid bari khal (Ch-0+000km to 2+175km) (Ch-0+000km to 0+600km) Re-excavation of Munshi bari khal (Ch-0+000km to 0+600km) Ref. Lined Section 16 Nos. On 9 Khals And SP Identf. Signboard (2 nos.) Construction of WMCA office building
|
SSSWRDP
|
mehendiganj
|
|
|
16.75
|
94
|
136.54
|
S H Enterprise
|
134.56
|
26/12/2022
|
28/04/2022
|
30/04/2022
|
100
|
127.49
|
94
|
30/11/2022
|
|
564
|
SP44136/Paschim Cheyam Takta
|
Shayem Takta Khal re-xcavation (Ch:0.00m - 2130m) Paschim Shayem Takta Khal re-xcavation (Ch:0.00m - 2200m) Jahir Uddin Khal re-xcavation (Ch:0.00m - 1930m) Const. of 09Nos. Ref. lined Section on 03 Khals, SP Identf. sign board 2, SP Area Indication Post 2 Nos.
|
SSSWRDP
|
mehendiganj
|
|
|
6.26
|
0
|
49.99
|
LCS
|
49.99
|
01/01/1900
|
|
|
0
|
0.00
|
0
|
30/11/2022
|
|
565
|
SP13073/Kazir Char DR Subproject
|
Construction of WMCA Building (Semi pacca). Re-excavation of Boroier khal-1 (Ch: 0.00 - 1130 m) Re-excavation of Boroier khal-2 (Ch: 0.00 - 1050 m) Re-excavation of Pangashia branch khal (Ch: 0.00 - 1130 m) Re-excavation of Haolader barir branch khal (Ch: 0.00 - 1600 m) Reference lined section (9nos.) and Subproject Identification signboard (2nos.)
|
SSSWRDP
|
muladi
|
|
|
4.91
|
66
|
88.56
|
LCS sowkat hossen
|
86.42
|
05/02/2020
|
21/01/2021
|
30/04/2020
|
83
|
57.13
|
66
|
30/11/2022
|
|
566
|
SP14196/Toyka FCD Subproject
|
Re-excavation of Purba silimpur khal (Ch. 0.00 - 1620 m) Re-excavation of Sajir khal (Ch. 0.00 - 500 m) Re-sectioning of Toika embankment (Ch. 5900 - 9000 m) Refence lined section (4nos.) and SP identification Signboard (2nos.)
|
SSSWRDP
|
muladi
|
|
|
5.22
|
96
|
73.69
|
LCS tofajjel hossen
|
73.69
|
13/01/2020
|
12/02/2020
|
30/04/2020
|
100
|
71.28
|
96
|
30/11/2022
|
|
567
|
SP15274/Sreemoti FCD Subproject
|
Re-excavation of Goloi Bhanga Khal (Ch 0 - 5150m) Re-excavation of Chardumuri tola Khal (Ch 0 - 1375m) Reference line section (3 nos.) Basher Shako (7 nos.)
|
SSSWRDP
|
muladi
|
|
|
6.52
|
94
|
56.48
|
yasmin begum
|
56.48
|
03/02/2019
|
04/03/2019
|
30/04/2019
|
100
|
53.59
|
94
|
30/11/2022
|
|
568
|
SP25313/Char Batamara & Shafipur Subproject
|
Re-excavation of Boalia khal (Ch. 0.00 - 4600 m) Re-excavation of Boalia branch khal (Ch. 0.00 - 900 m) Reference Lined Section (7nos.), Bamboo bridge (4nos.), SP Signboard (2nos.) Maintenance of office.
|
SSSWRDP
|
muladi
|
|
|
5.50
|
91
|
88.61
|
md.siddikul
|
88.61
|
10/12/2020
|
12/02/2020
|
30/04/2020
|
100
|
81.16
|
91
|
30/11/2022
|
|
569
|
SP62049/Kurir Char Miar Char Subproject
|
Re-excavation of Kadamtalar Khal (Ch. 0+100 to Ch. 2+410 km) Re-excavation of Khokon Master Bari Khal (Ch. 0+000 to Ch. 1+300 km). Re-excavation of Mostofa Bari Khal (Ch. 0+000 to Ch. 0+780 km) Re-excavation of Natachora Khal (Ch. 0+000 to Ch. 1+652m) Re-excavation of Natachora Br.1 Khal (Ch. 0+000 to Ch. 0+400m) Re-excavation of Natachora Br.2 Khal (Ch. 0+000 to Ch. 0+400m) Const. of 07 Nos Reference lined Section 6 Khals, SP Identf. sign board 2 Nos., Demercation Post 22 Nos. and SP Indication Post 2 Nos. Const. of Culvert (2V-4.0m X 4.0m) on Kadamtalar khal Const. of WMCA office (12.0mx6.0m)
|
SSSWRDP
|
muladi
|
|
|
6.84
|
97
|
161.30
|
M/S Amir Engineering Corporation
|
156.48
|
27/03/2023
|
29/03/2023
|
31/05/2023
|
100
|
152.20
|
97
|
30/11/2022
|
|
570
|
051/176
|
Construction of kobai UP Complex
|
UCCP-2
|
bakerganj
|
|
|
|
100
|
98.89
|
|
93.94
|
09/07/2014
|
|
30/12/2015
|
100
|
92.57
|
100
|
31/08/2020
|
|
571
|
050/176
|
Construction of muladi UP Complex
|
UCCP-2
|
bakerganj
|
|
|
|
100
|
90.91
|
|
79.72
|
17/05/2016
|
|
23/02/2017
|
100
|
78.98
|
100
|
31/08/2020
|
|
572
|
w.510
|
Construction of DUDHOL UP Complex
|
UCCP-2
|
bakerganj
|
|
|
|
100
|
109.45
|
|
98.50
|
09/08/2017
|
|
08/05/2018
|
100
|
98.33
|
100
|
10/08/2020
|
|
573
|
w-507
|
Construction of FARIDPUR UP Complex
|
UCCP-2
|
bakerganj
|
|
|
|
100
|
107.85
|
|
97.07
|
09/08/2017
|
|
08/05/2018
|
100
|
96.97
|
100
|
09/08/2020
|
|
574
|
070/246
|
Cons. of durgapasa up
|
UCCP-2
|
bakerganj
|
|
|
|
100
|
79.89
|
|
80.53
|
17/12/2009
|
|
28/06/2010
|
100
|
80.42
|
100
|
10/07/2020
|
|
575
|
(70/246)
|
Construction of DURGAPASA UP Complex
|
UCCP-2
|
bakerganj
|
|
|
|
100
|
79.89
|
|
80.53
|
17/12/2009
|
23/12/2009
|
28/06/2010
|
100
|
80.42
|
100
|
15/04/2015
|
|
576
|
Kobai
|
Kobai
|
UCCP-2
|
bakerganj
|
|
|
|
0
|
98.89
|
|
93.94
|
09/07/2014
|
15/07/2014
|
|
50
|
0.00
|
0
|
15/04/2015
|
|
577
|
w.254
|
Construction of banaripara UP Complex
|
UCCP-2
|
banaripara
|
|
|
|
100
|
86.94
|
|
86.91
|
11/09/2014
|
|
14/06/2016
|
100
|
86.91
|
100
|
10/08/2020
|
|
578
|
Banaripara
|
Banaripara
|
UCCP-2
|
banaripara
|
|
|
|
0
|
86.94
|
|
86.91
|
11/09/2014
|
16/11/2014
|
|
85
|
0.00
|
0
|
15/04/2015
|
|
579
|
069/246
|
Cons. of jagua up
|
UCCP-2
|
barishal-s
|
|
|
|
100
|
81.00
|
|
97.11
|
25/04/2011
|
|
30/05/2016
|
100
|
96.54
|
100
|
10/07/2020
|
|
580
|
w.245
|
Construction of mahilara UP Complex
|
UCCP-2
|
gouranadi
|
|
|
|
100
|
92.62
|
|
87.99
|
03/09/2013
|
|
31/12/2015
|
100
|
87.99
|
100
|
10/08/2020
|
|
581
|
Mahilara
|
Mahilara
|
UCCP-2
|
gouranadi
|
|
|
|
|
92.62
|
|
87.99
|
03/09/2013
|
08/09/2013
|
|
50
|
6.00
|
|
15/04/2015
|
|
582
|
w.480
|
Construction of dulkhola UP Complex
|
UCCP-2
|
hizla
|
|
|
|
100
|
132.76
|
|
132.55
|
01/06/2017
|
|
13/03/2018
|
100
|
132.55
|
100
|
10/08/2020
|
|
583
|
w.425
|
Construction of gaurbodi UP Complex
|
UCCP-2
|
hizla
|
|
|
|
100
|
116.45
|
|
122.28
|
16/04/2014
|
|
15/01/2016
|
100
|
122.14
|
100
|
10/08/2020
|
|
584
|
Gourobdi
|
Gourobdi
|
UCCP-2
|
hizla
|
|
|
|
|
116.45
|
|
122.28
|
16/04/2014
|
21/04/2014
|
|
75
|
|
|
15/04/2015
|
|
585
|
W.334
|
Construction of 3 no CHARAKKORIA UP Complex
|
UCCP-2
|
mehendiganj
|
|
|
|
100
|
114.98
|
|
123.95
|
26/06/2014
|
|
16/09/2015
|
100
|
121.18
|
100
|
12/08/2020
|
|
586
|
w.210
|
Construction of 11 no chanpur UP Complex
|
UCCP-2
|
mehendiganj
|
|
|
|
100
|
129.99
|
|
105.01
|
31/01/2016
|
|
30/06/2017
|
100
|
103.34
|
100
|
10/08/2020
|
|
587
|
3No Charakkoria
|
3No Charakkoria
|
UCCP-2
|
mehendiganj
|
|
|
|
|
114.98
|
|
123.95
|
26/06/2014
|
30/06/2014
|
|
80
|
|
|
15/04/2015
|
|
588
|
w.375
|
Construction of SAFIPUR UP Complex
|
UCCP-2
|
muladi
|
|
|
|
100
|
90.91
|
|
86.36
|
25/11/2013
|
|
29/02/2016
|
100
|
89.38
|
100
|
13/08/2020
|
|
589
|
Safipur
|
Safipur
|
UCCP-2
|
muladi
|
|
|
|
|
90.91
|
|
86.36
|
25/11/2013
|
30/11/2013
|
|
70
|
3.00
|
|
15/04/2015
|
|
590
|
W.321
|
Construction of 7 no bamrail UP Complex
|
UCCP-2
|
uzirpur
|
|
|
|
100
|
87.79
|
|
87.79
|
24/06/2013
|
|
30/11/2016
|
100
|
100.00
|
100
|
13/08/2020
|
|
591
|
w.497
|
Construction of satla UP Complex
|
UCCP-2
|
uzirpur
|
|
|
|
100
|
106.18
|
|
95.56
|
24/06/2018
|
|
04/02/2019
|
100
|
95.56
|
100
|
13/08/2020
|
|
592
|
CBU-100/ Purto-200
|
বরিশাল জেলার বাবুগঞ্জ উপজেলাধীন বীরশ্রেষ্ঠ জাহাঙ্গীরনগর ইউনিয়নের অর্ন্তগত বাবুগঞ্জ জিসি রাস্তার পার্শ্বে ০.০০মিটার চেইনেজে লাশঘাটা খালের উপর ব্রিজ নির্মাণ (রোড আইডিঃ ৫০৬০৩৫০১১)
|
UHBP
|
babuganj
|
506035011
|
|
50.00
|
0
|
540.48
|
M/S. Progoti Enterprise, Dasherjangal, Gohairhat, Shariatpur.
|
438.95
|
18/05/2021
|
25/05/2021
|
31/12/2024
|
35
|
146.03
|
0
|
28/06/2024
|
|
593
|
CBU-100/ Purto-201
|
বরিশাল জেলার বাবুগঞ্জ উপজেলাধীন বাবুগঞ্জহাট - আগরপুরহাট সড়কে ১৯৮৮মিটার চেইনেজে ব্রিজ নির্মাণ (রোড আইডিঃ ৫০৬০৩২০০২)
|
UHBP
|
babuganj
|
506032002
|
|
28.00
|
0
|
402.42
|
Barendra Construction Ltd.
|
362.18
|
15/07/2024
|
22/07/2024
|
21/07/2025
|
0
|
0.00
|
0
|
28/06/2024
|
|
594
|
CBU-100/ Purto-198
|
বরিশাল জেলার বাকেরগঞ্জ উপজেলাধীন দক্ষিণ কানকি কিঞ্চাকাঠি জিপিএস এবং উওর কানকি বাজার সড়কে শ্রীমন্থা নদীর উপর ব্রিজ নির্মাণ (রোড আইডিঃ ৫০৬০৭৫১১৯)
|
UHBP
|
bakerganj
|
506075119
|
|
72.00
|
0
|
975.91
|
M/S. Hazi Enterprise, Bakergonj, Barisal.
|
865.42
|
05/05/2021
|
11/05/2021
|
26/07/2023
|
45
|
380.00
|
0
|
28/06/2024
|
|
595
|
CBU-100/ Purto-194
|
বরিশাল জেলার বানরীপাড়া উপজেলাধীন উদয়কাটি ইউপিসি ভায়া গঙ্গামনি জিপিএস - মুরারবাড়ী ত্রিমুখি হাট সড়কে ০০ মিটার চেইনেজে হাশির খালের উপর RCC ব্রিজ নির্মাণ। (রোড আইডিঃ ৫০৬১০৩০১২)
|
UHBP
|
banaripara
|
506103012
|
|
60.00
|
0
|
758.33
|
M/S. Kohinoor Enterprise, Dadpur Lodge, Barishal
|
818.31
|
25/10/2020
|
02/11/2020
|
15/07/2022
|
100
|
817.84
|
0
|
28/06/2024
|
|
596
|
CBU-100/ Purto-195
|
বরিশাল জেলার বানরীপাড়া উপজেলাধীন দক্ষিণ নাজিরপুর হতে মহিষাপোতা আবাসন ভায়া বানারীপাড়া লঞ্চঘাট সড়কে ১২৩৫ মিটার চেইনেজে RCC ব্রিজ নির্মাণ। (রোড আইডিঃ ৫০৬১০৩৪০৮৪)
|
UHBP
|
banaripara
|
5061034084
|
|
45.00
|
0
|
350.90
|
M/S. Islam Brothers Ltd-M/S. Meem & Co (JV), 42-43, Shiddeshwari Circular Road(4th Floor, Dhaka-1217.
|
343.26
|
17/05/2021
|
24/05/2021
|
05/12/2022
|
100
|
342.92
|
0
|
28/06/2024
|
|
597
|
CBU-100/ Purto-404
|
বরিশাল জেলার বানারীপাড়া উপজেলাধীন দক্ষিণ নাজিরপুর হাইস্কুল ভায়া বানারীপাড়া লঞ্চঘাট-মহিশাপোতা আবাস সড়কে ৯২মিটার চেইনেজে (রোড আইডি-৫০৬১০৪০৮৪) সেতু নির্মাণ।
|
UHBP
|
banaripara
|
506104084
|
|
99.00
|
0
|
1198.51
|
Mohammed Eunus & Brothers(Pvt.) Ltd
|
1078.66
|
10/01/2023
|
17/01/2023
|
16/07/2024
|
45
|
333.94
|
0
|
28/06/2024
|
|
598
|
CBU-100/ Purto-405
|
বরিশাল জেলার বানারীপাড়া উপজেলাধীন মধুরভিটা স্কুল হতে মোল্লাবাড়ী বাজার ভায়া তেললা মাঝির বাড়ী মাদ্রাসা সড়কে ৩০০মিটার চেইনেজে সেতু নির্মাণ (রোড আইডি-৫০৬১০৫০৫০)।
|
UHBP
|
banaripara
|
506105050
|
|
52.00
|
0
|
782.99
|
EFTE-Poly (JV)
40, West Tejturi Bazar, Tejgaon, Dhaka.
|
702.99
|
19/06/2022
|
26/06/2022
|
23/10/2024
|
95
|
522.12
|
0
|
28/06/2024
|
|
599
|
CBU-100/ Purto-468
|
Access Road to the Bridge Construction of 60.00m Long RCC Girder Bridge On Udaykati UPC via Gongamoni GPS-Murarbari Trimukhi hat road ar Ch. 00m. (Road ID: 506103012) Under Banaripara Upazila, District: Barishal.
|
UHBP
|
banaripara
|
506103012
|
0.40
|
0.00
|
0
|
511.79
|
M/S. Sifat Enterprise
|
460.61
|
02/08/2023
|
08/08/2024
|
08/08/2024
|
69
|
316.25
|
0
|
28/06/2024
|
|
600
|
CBU-100/ Purto-403
|
বরিশাল জেলার গৌরনদী উপজেলাধীন বিথি বাজার (এনএইচডব্লিও) হতে ভুরগাথা বাস-ষ্টেন (এনএইচডব্লিও) ভায়া আমানটাগঞ্জ হাট সড়কে ৮০০মিটার চেইনেজে সেতু নির্মাণ (রোড আইডি-৫০৬৩২২০১৭)।
|
UHBP
|
gouranadi
|
506322017
|
|
24.00
|
0
|
345.84
|
M/S. Kohinoor Enterprise
|
380.21
|
25/08/2022
|
02/09/2022
|
10/02/2023
|
0
|
0.00
|
0
|
28/06/2024
|
|
601
|
CBU-100/ Purto-199
|
বরিশাল জেলার হিজলা উপজেলাধীন হোসনাবাদ মেমানিয়া ইউপি হতে ডিগ্রীরচর বাজার ভায়া খাগেরচর আশ্রায়ন রাস্তায় তেনাছিড়া ব্রিজ নির্মাণ (রোড আইডিঃ ৫০৬৩৫৩০১২)
|
UHBP
|
hizla
|
506353012
|
|
60.00
|
0
|
704.07
|
M/S. Progoti Enterprise, Dasherjangal, Gohairhat, Shariatpur.
|
572.05
|
12/08/2021
|
19/08/2021
|
30/12/2023
|
40
|
203.00
|
0
|
28/06/2024
|
|
602
|
CBU-100/ Purto-203
|
বরিশাল জেলার মেহেন্দিগঞ্জ উপজেলাধীন শায়েস্তাবাদ জিসি(বরিশাল সদর)-হিজলা উপজেলা হেড কোয়ার্টার ভায়া গাজীরহাট, কাজীরহাট জিসি মিয়ারহাট এবং একতারহাট (একতার রাস্তার ব্রিজ) ২৪১৫০মিটার চেইনেজে (রোড আইডিঃ ৫০৬৬২২০০৮) সেতু নির্মাণ।
|
UHBP
|
mehendiganj
|
506624080
|
|
60.00
|
0
|
657.01
|
Md. Mahfug khan Ltd & M/S. Layla Builders(JV)
|
511.49
|
18/11/2021
|
25/11/2021
|
30/05/2024
|
35
|
148.35
|
0
|
28/06/2024
|
|
603
|
CBU-100/ Purto-402
|
বরিশাল জেলার উজিরপুর উপজেলাধীন যোগীরকান্দা গালা বাজার-ওয়েষ্ট সাইড খেয়াঘাট-ওয়েষ্ট সাইড পাকা সড়কে ০.০০মিটার চেইনেজে সেতু নির্মাণ (রোড আইডি-৫০৬৯৪৫২৯৬)।
|
UHBP
|
uzirpur
|
506945296
|
|
96.00
|
0
|
1292.22
|
M/S. Kohinoor Enterprise
Dadpur Lodge, Barishal.
|
1259.92
|
29/06/2022
|
06/07/2022
|
23/10/2024
|
45
|
520.80
|
0
|
28/06/2024
|
|
604
|
UIIP-BC/PCO/W-520
|
A) Construction of Shed for Public Transport Passenger (28.00sqm) Beside R&H Road Connecting point on Bus stand at ward No.01 Under Bakerganj Pourashava.
B) Construction of One Storied Public Toilet (Type A=56.00sqm) Beside R&H Road & Jelkhana Khal at ward No.02 Under Bakerganj Pourashava.
|
UIIP
|
bakerganj
|
|
|
|
87
|
47.11
|
M/S Enterprise
|
51.51
|
12/09/2022
|
19/09/2022
|
11/09/2023
|
97
|
44.94
|
87
|
07/10/2024
|
|
605
|
UIIP-BC/PCO/W-551
|
A) Construction of RCC Road from Sadar road to Betagi Road (Ch: 0.00-62.00m) Under R&H Bridge at ward No.-02, Under Bakerganj Paurashava.
B) Construction of RCC road from Aga baker road to Bongobondhu Road (Ch:0.00-156.00m) Under R&H bridge Bank of Srimonto River at ward No.-08, Under Bakerganj Paurashava.
C) Construction of RCC road from Sahebganj road to Sabujbag road west side of twin quarter (Ch: 0.00 -157.00m & Link 7m+7m=14m, Total Length=171m) at ward no 05, Under Bakerganj Paurashava
D) Construction of Rustum ali road by RCC from R&H road to T&T road, Ch:0.00-122.00m at ward No.- 04, Under Bakerganj Paurashava
E) Construction of RCC road from aga baker khan link road to aga baker khan road west side of Pourashava road (Ch:0.00-119.00m) at ward no. 04, Under Bakerganj Paurashava
Construction of RCC road from Talukder bari road to Mollik bari road (Brave Freedom Fighter Abdus Sobhan Mallik Road) (Maim Road Ch: 0.00-120.00m & Link-01=20m, Link-02=80m, Link-03=15m) at ward no 09, Under Bakerganj Paurashva
G) Construction of aga baker khan Main Road by RCC (Ch:0.00-51.00=51m) from T&T Road to R&H road at ward No. 04, Under Bakerganj Paurashava. (Dropped)
|
UIIP
|
bakerganj
|
|
0.88
|
|
85
|
145.86
|
M/S Enterprise
|
143.47
|
03/06/2023
|
03/07/2023
|
02/06/2024
|
100
|
122.18
|
85
|
07/10/2024
|
|
606
|
UIIP/PCO/G-34
|
Implementation & Supply 765 nos Waste Basket (120 ltr) & 10 nos Non-motorized vehicle (van) under Bakerganj Pourashava District: Barishal.
|
UIIP
|
bakerganj
|
|
|
|
|
39.97
|
RFL Plastrics Limited
|
27.60
|
|
|
|
10
|
|
|
07/10/2024
|
|
607
|
UIIP-BC/PCO/W-123
|
Construction of R.C.C. road from Bakerganj Betagi road to Baroi Bari Bridge infront of B.I.P. Colony.Ward No-01.Under Bakerganj Pourashava.Ch00.00-885.00m.
Estimate for Construction of B.C road from Shahebganj road to Shahebganj West Side of Tween Quarter. Ch157-257.00 m100.00 m. Ward no-05.Under Bakerganj Pourashava
|
UIIP
|
bakerganj
|
|
0.99
|
0.00
|
100
|
91.15
|
M/S Muhib Construction
|
91.14
|
06/10/2020
|
|
15/10/2021
|
100
|
91.01
|
100
|
29/09/2022
|
|
608
|
UIIP-BC/PCO/W-124
|
Construction of B.C road from Ruhiterpar R & H to Padma Dighi via Fiha Bricks.Ward No-06. Under Bakerganj Pourashava.Ch 00m - 682m.
construction of BC road from R & H road to Hasan Mekar house. Ward No-01. Under Bakerganj Pourashava. Ch00m to ch320 m.
|
UIIP
|
bakerganj
|
|
1.00
|
0.00
|
99
|
90.17
|
M/S T M Enterprise
|
90.17
|
04/10/2020
|
|
15/10/2022
|
100
|
89.01
|
99
|
29/09/2022
|
|
609
|
UIIP-BC/PCO/W-125
|
Estimate for RCC road of Post Office road to Varani Khal.LGED Approch and Hospital Ch00m-310m and Post Office road to LGED Bridge Approch towards North- East Ch00-240 m.Ward No-05. Under Bakerganj Pourashava.
Estimate for Construction of R.C.C road from Bakerganj Betagi road to B.I.P road North Side of Miraz House.Ch 00m to 362 m. Ward No-01.Under Bakerganj Pourashava.
|
UIIP
|
bakerganj
|
|
0.60
|
0.00
|
100
|
109.23
|
M/S Muhib Construction
|
109.22
|
04/10/2020
|
|
15/10/2021
|
100
|
109.14
|
100
|
29/09/2022
|
|
610
|
UIIP-BC/PCO/W-126
|
Construction of R.C.C road from Sree dhanto bariroad to Atharogasiagami road via Nagor Mollah house.Ward No-0809. Under Bakerganj Pourashava.Ch 00 m- 885 m
|
UIIP
|
bakerganj
|
|
0.89
|
0.00
|
100
|
99.93
|
M/S Muhib Construction
|
99.93
|
06/10/2020
|
|
15/10/2021
|
100
|
99.91
|
100
|
29/09/2022
|
|
611
|
UIIP-BC/PCO/W-159
|
Construction of RCC Drain left side of B.I.P Road from Bakerganj Betagi road to Khalifa Bari Khal ChOO.OOm to 510m.Ward No-O1.Under Bakerganj Pourashava and Agabaker Road to High School Road ChOO.OOm to 60m.Ward no- 04Under Bakerganj Pourahava.
|
UIIP
|
bakerganj
|
|
|
0.00
|
100
|
89.11
|
S/M Enterprise
|
89.00
|
01/11/2020
|
08/11/2020
|
30/10/2021
|
100
|
88.94
|
100
|
29/09/2022
|
|
612
|
UIIP-BC/PCO/W-160
|
Construction of RCC Road from Akon Bari Road to Talukder Bari Road. Ch0.00-590.00m590.00m and Link Akon 3ari Mosque Ch 0.00-90.00 m. Total Length 680m Ward no- 09.Under Bakerganj Pourashava.
|
UIIP
|
bakerganj
|
|
0.68
|
0.00
|
100
|
84.68
|
S/M Enterprise
|
84.68
|
01/11/2020
|
08/11/2020
|
30/10/2021
|
100
|
84.66
|
100
|
29/09/2022
|
|
613
|
UIIP-BC/PCO/W-161
|
A Construction of RCC Road from Bakerganj Betagi Road to Runshi varry Road West side of Kundo Bari towards North ChO.OO-480m480m Ward No-01. Under Bakerganj Pourashava
B Construction of RCC Road from Bakerganj Betagi Road to Runshi varry Road infront of Kalarn Councilor house toward west ChO.OO-165m165m. Ward no 01. Under Bakerganj Pourashava
C Construction of Graveyard Road by RCC Ch 199-326 m. At ward No 07.Under Bakerganj Pourashava.
|
UIIP
|
bakerganj
|
|
0.77
|
0.00
|
100
|
95.37
|
M/S Muhib Construction
|
95.31
|
01/11/2020
|
08/11/2020
|
30/10/2021
|
100
|
94.45
|
100
|
29/09/2022
|
|
614
|
UIIP-BC/PCO/W-291
|
A Construction of RCC Road from high School road to Primary School and JSU High School.Bakerganj Pourashava.Ward No-04. Under Bakerganj Pourashava B Construction of RCC Road fromR & H road to M. Rahman Sarok. North side of Muzahidia Madrasha Ward No- 02. Under Bakerganj Pourashava. ChOOm-266m266m. C Construction of RCC Road from Sadar road to Ripon Councilors house. Ward No-02. Under Bakerganj Pourashava. ChOOm-244m.D Construction of RCC Road from Sadar road to Tulatoli River & house of ton Chakraborti twowards West. Ward No- 02. Under Bakerganj Pourashava. ChOOm 153m .Link30m
|
UIIP
|
bakerganj
|
|
1.03
|
0.00
|
86
|
121.91
|
S/M Enterprise
|
121.86
|
01/08/2021
|
01/08/2021
|
31/07/2022
|
100
|
104.79
|
86
|
29/09/2022
|
|
615
|
UIIP-BC/PCO/W-292
|
A. Construction of RCC Drain from West side of Rony house to R and H ditch Ward 0 I. Under Bakerganj Pourashava. ChO.00-153.00m 153.00m.
B. Construction of RCC Drain from Skin Mridha shop to Thana more Chourasta existing RCC Drain Ch 00-98.00m D I from West side of Skin Mridha shop to Tulatoli River. Ch 00-122.00m D2 from Skin Mridha house to proposed D2 drain Ch 00-92m92m D3.At ward No-03. Under Bakerganj Pourashava
C. Construction of RCC Drain from Emdad Khandoker house to R and Khal. At Ward No-07. Under Bakerganj Pourashava.ChOO- 107m.
D. Construction of RCC Drain from Md. Kalarn house to Sreemonto river East side of Madrasha Road and West side of Girls School at ward No-05. Under Bakerganj Pourashava. D I ChOO-285m. D2 ChOO-60m.
|
UIIP
|
bakerganj
|
|
|
0.00
|
82
|
136.59
|
M/S Muhib Construction
|
139.35
|
01/08/2021
|
01/08/2021
|
31/07/2022
|
100
|
114.05
|
82
|
29/09/2022
|
|
616
|
UIIP-BC/PCO/W-293
|
A construction of Single Vent RCC 3.00 x 3.00 Box Culvert in khal from R H road to North Azimpur Kshashem Mazi Bari Road. Ward No-07. Under Bakerganj Pourashava
B. construction of Single Vent RCC 2.00x2.00 Box Culvert In khal side of Runshi road to West side of Kalam Councilors house. Ward No-O1. Under Bakerganj Pourashava
C. construction of Single Vent RCC 2.00x2.00Box Culvert in Varani Khal West side of Bari market. Ward No-OS. Under BakerganjPourashava
D. construction of Single Vent RCC 2.00x2.00Box Culvert in Khal Padma Dighivarry road . Ward No-06. Under Bakerganj Pourashava.
E. construction of Single Vent RCC 2.00x2.00 Box Culvert in Khal Runshiivarry road to Shampurgami road in front of Unus Hawladers house Ward No-01. Under Bakerganj Pourashava.
F construction of Single Vent RCC 2.00x2.00 Box Culvert in Khal Ruhiter par road towards South in front of Akkas Gazi House Ward No-09. Under Bakerganj Pourashava.
|
UIIP
|
bakerganj
|
|
|
13.00
|
95
|
76.70
|
M/S Jamal Sarder
|
76.68
|
01/08/2021
|
01/08/2021
|
31/07/2022
|
100
|
72.87
|
95
|
29/09/2022
|
|
617
|
UIIP-BC/PCO/W-136
|
(A) Improvement of road from Torki Omor Roy House Bridge to Profullo Chokroborti House Ch 0.00m to 775m by Bituminous Dense Carpeting DC Gournadi Pourashava District Barishal.
(B) Rehabilitation of BC road from Torki High School to Kali Khola ch 0.00m to 450m by Bituminous Dense Carpeting DC with Three U-Drain Under Gournadi Pourashava District Barishal.
(C) Improvement of road from Sundardi Abdul Mozid Pre-Cadet School to Md. Alomgir Shikder house Ch 0.00m to 558m by Bituminous Dense Carpeting DC Gournadi Pourashava District Barishal.
(D) Rehabilitation of BC road from Torki Bandor Goat Market to Anondopur Bridge Ch 0.00m to1328m by Bituminous Dense Carpeting DC Gournadi Pourashava District Barishal.
|
UIIP
|
gouranadi
|
|
3.11
|
0.00
|
100
|
161.73
|
M/S Howleder enterprise
|
155.88
|
27/10/2020
|
03/11/2020
|
30/06/2022
|
100
|
155.71
|
100
|
07/10/2024
|
|
618
|
UIIP-BC/PCO/W-233
|
(a) Improvement of road from Tikashar Khan Bari Mosque to Upazila Dormetory (Ch 0.00m to 391m) by Bituminous Dense Carpeting (DC), Gournadi Pourashava, District : Barishal.
(b) Repairing of BC road from Gournadi Upazila Gate to Gournadi Bazar via Azad Professor House (Ch 0.00m to 673m) by Bituminous Dense Carpeting (DC), Gournadi Pourashava, District : Barishal.
(c) Rehabilitation of BC road from Upazilla Public Health Office to Dewan Bari (Ch 0.00m to 240m) by Bituminous Dense Carpeting (DC), Gournadi Pourashava, District : Barishal.
(e) Rehabilitation of BC road from Hizoltala Paik Bari road to Bokultala road (Ch 0.00m to 318m) by Bituminous Dense Carpeting (DC), Gournadi Pourashava, District : Barishal
|
UIIP
|
gouranadi
|
|
1.50
|
0.00
|
100
|
158.69
|
M/S Howleder Enterprise
|
70.27
|
24/11/2020
|
01/12/2020
|
30/06/2022
|
100
|
70.27
|
100
|
07/10/2024
|
|
619
|
UIIP-BC/PCO/W-491
|
A) Improvement of road from Madbor Bari Jame-Mosque to Bangla Bazar road (Ch: 0.00m to 518m) by Bituminous Dense Carpeting (DC) with three U-Drain at Ch:100m 196m 350m of Gournadi Pourashava District : Barishal.
B) Rehabilitation of BC road South Bijoypur Mamun Furniture to R&H road (Ch: 0.00m to 566m) by Bituminous Dense Carpeting (DC) Gournadi Pourashava District : Barishal.
C) Construction of RCC road from Food Godown to Fish Market Bridge (Ch: 0.00m to 135m) Under Gournadi Pourashava District: Barishal
D) Repairing of BC road from Gournadi Thanar More to ASP Office Via Rob CEO House (Ch: 0.00m to 330m) by Bituminus Dense Carpeting (DC) Under Gournadi Pourashava District: Barishal
|
UIIP
|
gouranadi
|
|
1.55
|
0.00
|
100
|
91.59
|
M/S Howleder enterprise
|
91.58
|
23/05/2022
|
30/05/2022
|
22/05/2023
|
100
|
90.02
|
100
|
07/10/2024
|
|
620
|
UIIP-BC/PCO/W-492
|
A) Repairing of BC road from Diasur Joshim Shop to Banglabazer road (Ch: 0.00m to 766m) by Bituminus Dense Carpeting (DC) Under Gournadi Pourashava District: Barishal
B) Repairing of BC road from Gerakul Govt. Primary School to Dulal Khan Shop (Ch: 0.00m to 1160.00m) by Bituminus Dense Carpeting (DC) and Three U-drain at Ch. 296m 533m 722m ward No.08 Under Gournadi Pourashava District: Barishal
C) Construction of RCC road from Diasur kobiraj House to Alamin Howlader House(Ch: 0.00m to 190m) via Shohid Gazi House (Ch: 176.00m to 236m) Under Gournadi Pourashava District: Barishal
D) Construction and Installing Palisading for road side development at Pourashava road Tikasar Mintu Howlader House adjacent Pond (201m) by Masonry Brick work and Pre-Cast RCC Post Palisading ward No.05 under Gournadi Pourashava District : Barishal.
|
UIIP
|
gouranadi
|
|
2.28
|
0.00
|
100
|
115.13
|
M/S Howleder enterprise
|
115.11
|
23/05/2022
|
30/05/2022
|
22/05/2023
|
100
|
114.63
|
100
|
07/10/2024
|
|
621
|
UIIP-BC/PCO/W-493
|
A (i) Construciton of RCC Drain from Gournadi-Sarikal GC road North Side of Khan Shoping to via Bhuiya Store to Birendash store to Gournadi river (Ch: 0.00-195m D1) (ii) Ice factory to Shathi Garments (Ch: 0.00-95m D2) (iii) Birendash Store to Sochin Gosh Sweet factory near cannel (Ch: 0.00-95 D3) (iv) Shathi Garments to front of Registry Office (Ch: 0.00-85m D4) (v) Bhuiya Store to Gournadi Cannel ( Ch: 0.00-35m D5) Ward No. 05 Under Gournadi Pourashava Dist: Barishal.
B(i) Construciton of RCC Drain Torki Bandor Liton khan store to near by Sheraz Member shop cannel (Ch: 0.00-275m D1) (ii) Torki Bandor High School gate to Fish Market South Corner (Ch: 0.00-155m D2) (iii) Bagdad Hotel near by pond to south side of fish market Main drain (Ch: 0.00-100 D3) (iv) Torki Bandor Mosque to South side main drain (Ch: 0.00-60 D4) at ward No. 01 Under Gournadi Pourashava Dist: Barishal.
C (i) Construciton of RCC Drain from Gournadi - Sorikal GC road North side Karim Professor House to Chargadhatali Baitul Noor Mosque (Ch: 0.00-230m D1) (ii) Banker Akbar House to Baitul Noor Masque Main Drain (Ch: 0.00-120m D2) (iii) Baizid Akon House to Ekram Professor House near main Drain (Ch: 4.00-36m D3) (iv) X-Drain Near By Ekram Professor House (Ch: 0.00-04m) Ward No. 05 Under Gournadi Pourashava Dist: Barishal.
|
UIIP
|
gouranadi
|
|
|
0.00
|
94
|
231.90
|
M/S Howleder enterprise
|
231.90
|
06/06/2022
|
09/06/2022
|
31/08/2024
|
98
|
218.51
|
94
|
07/10/2024
|
|
622
|
UIIP-BC/PCO/W-494
|
A) Construction of Single Vent (2.00x2.00m) RCC Box Culvert at Ashokati-Gerakul Road infront of Paik Bari Ward No.08 Under Gournadi Pourashava Dist: Barishal.
B) Construction of Single Vent (2.00x2.60m) RCC Box Culvert at Torkir Char Kashir Mistir Dokan Ward No.02 Under Gournadi Pourashava Dist: Barishal.
C) Construction of Single Vent (4.30x4.30m) RCC Box Culvert Over Khal at Torki Vozon Kundu Oil Mil Ward No.02 Under Gournadi Pourashava Dist: Barishal.
D) Construction of Single Vent (3.00x3.00m) RCC Box Culvert Over Cannel infront of Torki Omor Roy House Ward No.01 Under Gournadi Pourashava Dist: Barishal.
E) Construction of Single Vent (1.30x1.30m) RCC Box Culvert Over Cannel infront of Diashur Chowkider House Road Ward No.08 Under Gournadi Pourashava Dist: Barishal.
|
UIIP
|
gouranadi
|
|
|
14.76
|
100
|
85.00
|
M/S Howleder enterprise
|
84.98
|
06/06/2022
|
09/06/2022
|
05/06/2023
|
100
|
83.86
|
100
|
07/10/2024
|
|
623
|
UIIP-BC/PCO/W-518
|
A) Construction of One Storied Public Toilet (Type A=56.00sqm) at ward No.06 Under Gournadi Pourashava, Dist: Barishal
B)Construction of Shed for Public Transport Passenger (28.00sqm) at ward No.06 Under Gournadi Pourashava, Dist: Barishal.
|
UIIP
|
gouranadi
|
|
|
0.00
|
100
|
49.90
|
M/S Howleder enterprise
|
49.89
|
03/07/2022
|
10/07/2022
|
29/02/2024
|
100
|
48.80
|
100
|
07/10/2024
|
|
624
|
UIIP-BC/PCO/W-553
|
A) Improvement of Road from Goat Market Road to Torki Bondor Mutual Trust Bank via Torki High School (Ch. 22.00 to 280.00m) by RCC with a Cross Drain at Ward no. 01, under Gournadi Pourashava, Barishal.
B) Improvement of Road from Sawra Shahjahan Howlader House to Sawra Govt. Primary School (Ch 0.00m to 146m) by RCC and One Road cross Drain at Ch.3.00m, Ward No. 06, Gournadi Pourashava, District : Barishal.
C) Improvement of BC Road from Hizoltala Paik Bari to Bokultala Road (Ch:174-318m) by Bituminous Dense Carpeting (DC) at Ward No:06 under Gournadi Pourashava, District: Barishal
|
UIIP
|
gouranadi
|
|
0.54
|
|
85
|
75.88
|
M/S Howleder enterprise
|
75.86
|
28/05/2023
|
28/05/2023
|
27/05/2024
|
99
|
216.31
|
85
|
07/10/2024
|
|
625
|
UIIP/PCO/G-35
|
Implementation & Supply 602 nos Waste Basket (120 ltr) & 20 nos Non-motorized vehicle (van) under Gournadi Pourashava District: Barishal.
|
UIIP
|
gouranadi
|
|
|
|
0
|
39.98
|
RFL Plastrics Limited
|
29.99
|
03/04/2024
|
03/04/2024
|
02/07/2024
|
0
|
0.00
|
0
|
07/10/2024
|
|
626
|
UIIP-BC/PCO/W-137
|
(A) Improvement of road from Boro Kasba R&H to West side of Allah Mosque via Ex-Counsilor Alebali House Ch 0.00m to 480m by Bituminous Dense Carpeting DC with One U-Drain Gournadi Pourashava District Barishal. (B) Rehabilitation of BC road from Torki Cow Hat to Firoz Howlader House Tin Kona Via Sazol Kazi Counsilor House ch 0.00m to 825m by Bituminous Dense Carpeting DC Under Gournadi Pourashava District Barishal.(C) Improvement of road from Gournadi Goinaghata Bridge to Gournadi Bondar Katcha Bazar via Abdur rob Serniabad Hostel Ch 0.00m to 930m by Bituminous Dense Carpeting DC with Four U-Drain Gournadi Pourashava District Barishal.
|
UIIP
|
gouranadi
|
|
2.24
|
0.00
|
0
|
149.30
|
M/S Howleder Enterprise
|
149.28
|
27/10/2020
|
03/11/2020
|
30/06/2022
|
100
|
0.00
|
0
|
29/09/2022
|
|
627
|
UIIP-BC/PCO/W-234
|
(a) Improvement of road from Ashokathi Bazar to Rasel Councilor House (Ch 0.00m to 510m) by Bituminous Dense Carpeting (DC), Gournadi Pourashava, District : Barishal
(b) Repairing of BC road from Ashokathi Kacha Bazar to Gerakul Joshim's Shop (Ch 0.00m to 1470m) by Bituminous Dense Carpeting (DC), Gournadi Pourashava, District : Barisha
(c) Rehabilitation of BC road from Ashokathi Filling Station to Gerakul Govt. Primary School (Ch 0.00m to 1315m) by Bituminous Dense Carpeting (DC), Gournadi Pourashava, District : Barishal
|
UIIP
|
gouranadi
|
|
3.30
|
0.00
|
52
|
128.15
|
M/S Howleder Enterprise
|
127.67
|
24/11/2020
|
01/12/2020
|
30/06/2022
|
100
|
66.14
|
52
|
29/09/2022
|
|
628
|
UIIP-BC/PCO/W-416
|
A) Construction of RCC Road Starting from Bosar Howlader House To Kazi Kamal House Ch. 0.00-350 m.Ward No.09.Under Muladi Pourashava District Barishal.
B) Construction of RCC Road Starting from Arif Shop To Praimary School Ch. 0.00-385m.Ward No.06 Under Muladi Pourashava District. Barishal.
|
UIIP
|
muladi
|
|
0.74
|
0.00
|
100
|
123.61
|
M/S. DEIP ENTERPRISE
|
123.32
|
17/01/2022
|
23/01/2022
|
16/01/2023
|
100
|
123.30
|
100
|
10/10/2024
|
|
629
|
UIIP-BC/PCO/W-555
|
(A) Improvement of RCC Road from Boro Mosque Delwar Shop To Graveyard (Ch. 0.00-105 m) at ward no. 06 Under Muladi Pourashova District. Barishal.
(B) Improvement of RCC Road from Main Road To H/O Ketab Ali Bapary/Jakir Bapary (Ch. 0.00-160 m) at ward No.02.Under Muladi Pourashava District Barishal.
(C) Improvement of RCC Road from Main Road Shah Alam Kha House To Habib Sikder (Paner Bor) (Ch. 0.00-305m) at ward No.03.Under Muladi Pourashava District Barishal.
(D) Improvement of RCC Road from Main Road To H/O Khalek Kha To Masud Mollah (Ch. 0.00-100m) ward No.04.Under Muladi Pourashava District Barishal.
(E) Improvement of RCC Road from CMB To Ajom Bapary & Bappy House (Ch. 0.00-320m) at ward No.07.Under Muladi Pourashava District Barishal.
(F) Improvement of RCC Road from Main Road To H/O Shipu Kha (Ch. 0.00-250 m) at ward No.02.Under Muladi Pourashava District Barishal.
|
UIIP
|
muladi
|
|
1.29
|
|
100
|
206.23
|
AKA-PC (JV)
|
214.56
|
06/06/2023
|
12/06/2023
|
05/06/2024
|
100
|
214.09
|
100
|
10/10/2024
|
|
630
|
UIIP/PCO/G-36
|
Implementation & Supply 439 nos Waste Basket (120 ltr) & 30 nos Non-motorized vehicle (van) under Muladi Pourashava District: Barishal.
|
UIIP
|
muladi
|
|
|
|
0
|
39.98
|
RFL Plastrics Limited
|
0.00
|
|
|
|
0
|
0.00
|
0
|
08/10/2024
|
|
631
|
UIIP-BC/PCO/W-115
|
01.Construction of RCC Road in CMB Road To Poura Border.In Ward No.07.Under Muladi.Pourashava.Ch.000-0892m
02.Construction of RCC Road in Siklone Centre To Stadium.In Ward No.04.Under Muladi Pourashava.Ch.000-0450m.
|
UIIP
|
muladi
|
|
1.34
|
0.00
|
100
|
119.40
|
M/S Rupali Construction
|
124.16
|
09/08/2020
|
|
12/08/2021
|
100
|
124.09
|
100
|
29/09/2022
|
|
632
|
UIIP-BC/PCO/W-116
|
01.Construction of RCC Road in Launch Ghat To Brick Field Via Mosque In Ward No.05.Under Muladi Pourashava.Ch.000-0780m.
02.Construction of RCC Road in GP Tower To CMB Road Via Sopon House In Ward No.07.Under Muladi.Pourashava.Ch.000-0450m.
|
UIIP
|
muladi
|
|
1.23
|
0.00
|
100
|
112.74
|
M/S Rupali Construction
|
112.51
|
08/09/2020
|
13/08/2020
|
12/08/2020
|
100
|
112.47
|
100
|
29/09/2022
|
|
633
|
UIIP-BC/PCO/W-231
|
01.Construction Of Rcc Road In East Side of Taltola Bajar To Anwar Shikder House.In Ward No.08.Under Muladi Pourashava.Ch.000-0813.(Salvage Tk=196102.00)
02.Construction of RCC Road in Main Road To Atik House House.In Ward No.02.Under Muladi Pourashava.Ch.000-0450m.(Salvage Tk=129515.00)
|
UIIP
|
muladi
|
|
1.26
|
0.00
|
100
|
120.25
|
M/S KHAN ABDUS SABUR
|
120.00
|
30/11/2020
|
07/12/2020
|
06/12/2021
|
100
|
119.88
|
100
|
29/09/2022
|
|
634
|
UIIP-BC/PCO/W-232
|
01.Construction of RCC Road in Mollah Bazar Bridge To Rastar Matha End Of The River Via Vranir Khal.In Ward No.03.Under Muladi.Pourashava.Ch.000-0820m.
02.Construction of RCC Road in Boroi Tola To Salam mal House Via Sardar Bari.In Ward No.07.Under Muladi Pourashava.Ch.000-0645m.
|
UIIP
|
muladi
|
|
1.47
|
0.00
|
100
|
135.56
|
M/S KHAN ABDUS SABUR
|
135.22
|
30/11/2020
|
07/12/2020
|
06/12/2020
|
100
|
135.18
|
100
|
29/09/2022
|
|
635
|
UIIP-BC/PCO/W-415
|
A.Construction Of Rcc Road starting from Mira Bari Mosque To Bapary bari House End of River. Ward No.06.Under Muladi Pourashava.Ch.0+00-0+410m.l.
B.Rehabilitation Of BC Road Strarting from Terochar Madrasha To Farid Howlader House Ch. 0.00-560m.by Bituminous Dense Carpeting.Ward No.02 Under Muladi Pourashava District. Barisha
|
UIIP
|
muladi
|
|
0.97
|
0.00
|
100
|
98.44
|
M/S KHAN ABDUS SABUR
|
98.28
|
17/01/2022
|
23/01/2022
|
16/01/2023
|
100
|
98.24
|
100
|
29/09/2022
|
|
636
|
UIIP-BC/PCO/W-417
|
A) Construction Of RCC Drain starting from Mithur Bari Culvert To Canel Ward No-04 Under Muladi Pourashava.Ch.0.00-306m
B) Construction Of RCC Drain starting from Poura Kitchen Market To Kheya Ghat Ward No-06 Under Muladi Pourashava Ch.0.00-400m
|
UIIP
|
muladi
|
|
|
0.00
|
100
|
123.10
|
m/s Khan Abdus Sabur
|
122.92
|
07/12/2021
|
14/12/2021
|
06/12/2022
|
100
|
122.87
|
100
|
29/09/2022
|
|
637
|
UIIP-BC/PCO/W-418
|
Construction Of RCC Drain starting from Dhali Market To East Bajar Ward No-06 Under Muladi Pourashava. Ch.0.00-336m
|
UIIP
|
muladi
|
|
|
0.00
|
100
|
58.60
|
M/S. DEIP ENTERPRISE
|
58.23
|
07/12/2021
|
14/12/2021
|
06/12/2022
|
100
|
58.21
|
100
|
29/09/2022
|
|
638
|
UIIP-BC/PCO/W-419
|
A) Constructin Of 1-Vent 4.00 X4.00m Rcc Box Culvert on Mira Bari Canel.In Ward No.06.Under Muladi Pourashava
B) Constructin Of 1-Vent 4.00 X4.00m Rcc Box Culvert on Akkas Howlader Canel Ward No.06 Under Muladi Pourashava
C) Constructin Of 1-Vent 3.00 X3.00m Rcc Box Culvert on Monosagong Ghat Canel Ward No.01 Under Muladi Pourashava
D) Constructin Of 1-Vent 4.00 X4.00m Rcc Box Culvert on Babul Sardar House Canel Ward No. 08 Under Muladi Pourashava
|
UIIP
|
muladi
|
|
|
15.00
|
100
|
88.72
|
M/S Al Mamun Entr.
|
88.57
|
07/12/2021
|
14/12/2021
|
06/12/2022
|
100
|
88.55
|
100
|
29/09/2022
|
|
639
|
UTMIDP- AGAI/ BARI/ WD-6
|
Constructionof U-Drain Culvert and Internal Drain Road on Muktijhodda Complex- Upazila H/Q.Hellepad via Livestock Office.
|
UTMIDP
|
agailjhara
|
|
0.13
|
|
0
|
13.56
|
M/S Mother Engineering
|
14.17
|
23/07/2019
|
|
30/10/2019
|
0
|
0.00
|
0
|
30/07/2019
|
|