LGED BARISHAL , District Scheme Details

Project Name
Upazila

District Scheme Details

SL No. Package No. Package Name Project Name Upazila Name Road ID Length of Road (Km) Length of Bridge (M) Building Qauntity (No) Estimated Amount (Lac) Name of Contractor Contract Amount (Lac) Date of Contract Date of Commencement Date of Completion Physical Progress (%) Financial Progress (Amt) Financial Progress (%) Date of Progress Update Remarks
1 BDIRWSP/BAR/BAK/DW-12 Widening & Strengthening of Bakergonj-Gobindopur Hat. [From RHD Bakerganj-Gobindopur via Rabipur, Shialguni, Kakorda, Vathshala Kalisuri road at Ch. 5590-17248m including 05 Nos. 4.00mx4.00m RCC Box Culvert at 6562m, 7933m, 9041m, 15050m & 16158m under Bakerganj Upazila, District-Barishal. Road ID No: 506072002. Salvage Materials Cost Tk. 4846796.00 BDIRWSP bakerganj 506072002 11.66 2417.06 EFTE.ETCL (PVT.) LIMITED-M/S. Amir Engineering Corporation (JV), Horinpala, Bhandaria, Pirojpur & College Row, Barisal, Bangladesh 2175.35 0 18/11/2024
2 BDIRWSP/BAR/BAN/DW-01 Widening & Strengthening of Chowmohona GC via Biserkandi, Umarerper, Baitakghata, Wazedia- RHD (Baisari) road at Ch. 6407-15746m and RCC Road-100m (Ch. 12614-12714m wazidia bazar) including 01 No. 1-vent 4.00mx4.00m RCC Box Culvert at ch. 15634m and 03 Nos. 1.00mx1.00m RCC Box Culvert at ch. 7480m, 10878m & 13274m and 01 No. Double vent 4.00mx4.00m RCC Box Culvert at ch. 15739m under Banaripara Upazila, District-Barishal. Road ID No: 506102001. Salvage Materials Cost Tk. 20504124.00 BDIRWSP banaripara 506102001 9.34 2518.42 M/S. Kohinoor Enterprise Dadpur Lodge, Kawnia 1st Lane, Barishal Sadar, Barishal 2266.58 0 11/11/2024
3 BDIRWSP/BAR/BAN/DW-02 Widening & Strengthening of (Danduat) RHD via Bangla Bazar, Aower Hat.-Harta GC road at Ch. 0.00-5000m including 01 No. 1.00mx1.00m RCC Box Culvert at ch. 1008m and 02 Nos. 2.00mx2.00m RCC Box Culvert at ch. 1338m & 7734m and 03 Nos. 1-vent 3.00mx3.00m RCC Box Culvert at ch. 757m, 1700m & 4830m and 01 No. 1-vent 4.00mx4.00m RCC Box Culvert at ch. 2350m under Banaripara Upazila, District-Barishal. Road ID No: 506102003. Salvage Materials Cost Tk. 6024928.00 BDIRWSP banaripara 506102003 5.00 1741.92 M/S. Kohinoor Enterprise Dadpur Lodge, Kawnia 1st Lane, Barishal Sadar, Barishal 1567.73 0 11/11/2024
4 BDIRWSP/BAR/SAD/DW-13 Widening & Strengthening of Charkawa Karnokati to Ranirhat via Napter hat , Char Aicha Poler hat road at Ch. 3941 - 8036m & 180m RCC Road including 02 Nos. 2.00m x 2.00m RCC Box Culvert at Ch. 4135m & 4357m under Sadar Upazila, District : Barishal. [Salvage Materials Cost Tk. 1008277] [Road ID No. 506512005]. BDIRWSP barishal-s 506512005 4.10 770.35 M/S Dhara Enterprise-MS Upakul ConstructionJV, Baptist Mission Road, Barisal 393.32 0 30/01/2025
5 BDIRWSP/BAR/SAD/DW-14 Part 1 : Construction for the vertical Extension of Office Building of Additional Chief Engineer, Barishal Division, LGED, Barishal. Part 2 : Construction for the vertical Extension of Office Building cum Dormitory Bhaban of Executive Engineer, LGED, Barishal. [Package No : BDIRWSP/BAR/SAD/DW- 14] BDIRWSP barishal-s 1094.45 M/S. Amir Engineering Corporation, College Row, Barisal, Bangladesh 1070.04 0 18/11/2024
6 BDIRWSP/BAR/MEH/DW-08 Widening & Strengthening of Shaestabad GC (Barisal Sadar)- Hizla Upzila HQ Via Gazirhat, Kazirhat GC, Miarhat & Ekkoterhat road at Ch. 10000-14700m and 150m RCC Road (Gabtoli Bazar portion Ch. 12273-12423m) under Mehendiganj Upazila, District-barishal. Road ID No: 506622008. Salvage Materials Cost Tk. 1846750.00 BDIRWSP mehendiganj 506622008 4.70 977.70 M/S. Kohinoor Enterprise, Dadpur Lodge, Kawnia 1st Lane, Barishal Sadar, Barishal 879.93 0 18/11/2024
7 BDIRWSP/BAR/MEH/DW-09 Widening & Strengthening of Ulania GC-Aliganj GC Road (Mehendigonj part) road at Ch. 0.00-3000m including 01 No. 4.00mx4.00m RCC Box Culvert at 2412m under Mehendiganj Upazila, District-barishal. Road ID No: 506622007. Salvage Materials Cost Tk. 6468993.00 BDIRWSP mehendiganj 506622007 3.00 892.96 M/S. Amir Engineering Corporation College Row, Barisal, Bangladesh 803.67 0 11/11/2024
8 BDIRWSP/BAR/MEH/DW-10 Widening & Strengthening of Ulania GC-Aliganj GC Road (Mehendigonj part) road at Ch. 3000-5600m including 03 No. 2.00mx2.00m RCC Box Culvert at3155m, 3922m & 4655m under Mehendiganj Upazila, District-barishal. Road ID No: 506622007. Salvage Materials Cost Tk. 4948400.00 BDIRWSP mehendiganj 506622007 2.60 787.12 M/S. Amir Engineering Corporation College Row, Barisal, Bangladesh 757.99 0 11/11/2024
9 BDIRWSP/BAR/MEH/DW-06 Widening & Strengthening of Shaestabad GC (Barisal Sadar)- Hizla Upzila HQ Via Gazirhat, Kazirhat GC, Miarhat & Ekkoterhat road at Ch. 300-5200m and 235m RCC Road (Dafader Bazar portion Ch. 3150-3385m & 50m RCC Road (Banghata Bazar portion Ch. 5150-5200m) including 01 No. 2.00mx2.00m RCC Box Culvert at 668m under Mehendiganj Upazila, District-barishal. Road ID No: 506622008. Salvage Materials Cost Tk. 1908322.00 BDIRWSP mehendiganj 506622008 2.20 1083.61 M/S. Kohinoor Enterprise, Dadpur Lodge, Kawnia 1st Lane, Barishal Sadar, Barishal 975.25 0 11/11/2024
10 BDIRWSP/BAR/MEH/DW-07 Widening & Strengthening of Shaestabad GC (Barisal Sadar)- Hizla Upzila HQ Via Gazirhat, Kazirhat GC, Miarhat & Ekkoterhat road at Ch. 5200-10000m and 100m RCC Road (Banghata Bazar portion Ch. 5200-5300m) under Mehendiganj Upazila, District-barishal. Road ID No: 506622008. Salvage Materials Cost Tk. 1865023.00 BDIRWSP mehendiganj 506622008 4.80 943.31 M/S. Kohinoor Enterprise, Dadpur Lodge, Kawnia 1st Lane, Barishal Sadar, Barishal 848.98 0 11/11/2024
11 BDIRWSP/BAR/MUL/DW-11 Widening & Strengthening of Muladi GC- Talukder Hat- Bashtala Bazar- Mirdar Hat upto Muladi Boarder road at Ch. 5640-9840m including 03 Nos. Double Vent- 4.00mx4.00m RCC Box Culvert at 7200m, 8250m & 9120m and 02 Nos. Single Vent- 3.00mx3.00m RCC Box Culvert at 5700m & 6700m and 01 No. Single Vent- 4.00mx4.00m RCC Box Culvert at 6000m under Muladi Upazila, District-barishal. Road ID No: 506692001. Salvage Materials Cost Tk. 1055990.00 BDIRWSP muladi 506692001 4.20 1111.48 Mohammed Eunus & Brothers (Pvt.) Ltd. Fortune Mall (7th Fl.), Baizid Bostami Road, Nasirabad, Panchlaish, Chattogram 1000.33 0 18/11/2024
12 BDIRWSP/BAR/UZI/DW- 15 Widening & Strengthening of Dhamura GC (Post Office) - Sholak Bazar - Batajore R & H road at Ch. 0.00m - 3620m including 06 Nos. 0.900m x 0.900m RCC Box Culvert at Ch.885m, 1395m, 1947m, 3385m , 3483m & 3770m and 05 Nos. 2.00m x 2.00m RCC Box Culvert at Ch.123m, 743m, 1620m, 2014m & 3303m and 1 No.2-vent 4.00m x 4.00m RCC Box Culvert at Ch.2411m under Uzirpur Upazila, District : Barishal. [Salvage Materials Cost Tk. 2980155.00] [Road ID No. 506942005]. BDIRWSP uzirpur 506942005 3.62 1299.71 Barendra Construction Ltd. H-146, Shaheb Bazar, Ghoramara; Boalia PS; Rajshahi 1169.74 0 30/01/2025
13 BDIRWSP/BAR/UZI/DW-03 Widening & Strengthening of Sanuhar R& H -Dhamura GC- Jalla- Satla GC Road at Ch. 0.00-8000m including 06 Nos. 0.900mx0.900m Drainage Culvert at Ch. 735m, 1210m, 3080m, 5800m, 6581m & 7950m and 01 No. 2.00mx2.00m RCC Box Culvert at Ch. 6764m under Uzirpur Upazila, District-Barishal. Road ID No: 506942003. Salvage Materials Cost Tk. 3040750.00 BDIRWSP uzirpur 506942003 8.00 1764.44 EFTE.ETCL (PVT.) LIMITED Horinpala, Bhandaria, Pirojpur 1588.00 0 11/11/2024
14 BDIRWSP/BAR/UZI/DW-04 Widening & Strengthening of Sanuhar R& H -Dhamura GC- Jalla- Satla GC Road at Ch. 8000-15000m under Uzirpur Upazila, District-Barishal. Road ID No: 506942003. Salvage Materials Cost Tk. 2324241.00 BDIRWSP uzirpur 506942003 7.00 1498.43 EFTE.ETCL (PVT.) LIMITED Horinpala, Bhandaria, Pirojpur 1348.59 0 11/11/2024
15 BDIRWSP/BAR/UZI/DW-05 Widening & Strengthening of Sanuhar R& H -Dhamura GC- Jalla- Satla GC Road at Ch. 15000-22965m under Uzirpur Upazila, District-Barishal. Road ID No: 506942003. Salvage Materials Cost Tk. 1897465.00 BDIRWSP uzirpur 506942003 7.97 1884.66 M. M. Builders & Engineers Ltd-M/S. Amir Engineering Corporation (JV) 1696.19 0 11/11/2024
16 BDRIDP/BAR/AGL/CCA-Rd/02 Improvement of Road from Seral-Goila road viaShahid Serniabad House- Tamer Jame Mosjid (Tamer Girls High School - Seral Community Center by BC From Ch. 0.0m-975m under Agailjhara Upazila,Barisal. BDRIDP agailjhara 0.98 55.27 M/S Mitushi Traders 45.84 100 08/04/2019 W/O Cancel
17 BDRIDP/BAR/AGL/CCA-Rd/08 Improvement of road from Hazi Mokbul Sardar House via Sardar Mohabubul Alom & Sardar Harun - Jainger Gomosta House road. at Ch.00 to 208m under Agailjhara Upazila Barisal. BDRIDP agailjhara 0.21 21.68 M/S Sharif Enterprise 22.77 22/03/2018 22/09/2018 100 08/04/2019  
18 BDRIDP/BAR/AGL/Gha/01 Construction of Ghat at Paisarhat Paschim par under Agailjhara Upazila Barisal BDRIDP agailjhara 29.00 M/S Sharif Enterprise 29.58 29/03/2018 29/09/2018 60 08/04/2019  
19 BDRIDP/BAR/AGL/UZ-RdR/03 Maintenance of Barthi- Valiukshi-Magura Bakal Hat Roada Earthwark from Ch. 9860- 11860m.b Carpeting DC 21.3 sqm.c 12mm SC-5237.7 sqm. d Palisading Work 103.00m. Under Agailjhara Upazila District- Barishal. BDRIDP agailjhara 506022008 1265178.00 0.00 0 08/04/2019 E-Tender Under Process.
20 BDRIDP/BAR/AGL/ UZ-RdR/04 Maintenance of Road From Nimtola RHD-Dhamura GC viaRatnapur UP Road at Ch 5265m-7383m Agailjhara Under Agailjhara Upazila District- Barishal. BDRIDP agailjhara 506022010 2249883.00 0.00 0 08/04/2019 E-Tender Under Process.
21 BDRIDP/BAR/AGL/UN-RdR/03 Maintenance of Road From Goila UP Office to Billogram Bazar via Rajer Bari Road at Ch 00m-2000mm Agailjhara Under Agailjhara Upazila District- Barishal. BDRIDP agailjhara 506023008 2890888.00 0.00 0 08/04/2019
22 BDRIDP/BAR/AGL/UN-RdR/02 Maintenance of Road From Basail Hat Rajihar UP-Batra Bazar viiiia Basail Pachchim Para Bazar Road at Ch 00m-1000m Agailjhara Under Agailjhara Upazila District - Barishal. BDRIDP agailjhara 506023006 3511387.00 0.00 0 08/04/2019
23 BDRIDP/ BAR/AGL/ CCA-Rd/09 A Improvement of Temar Bastaila Nagar GPS-West Mollapara-Ohchiarmad Bazar. i Earthwark Ch.650m-1865m.ii Carpeting DC Ch. 650m-1865m. iii Palsading 641m.B Choto Basail Kander Bepari House to East Valukshi Bridge.Salvaged Cost Tk 37835.00i Earthwark Ch.0.00m-360m.ii Carpeting DC Ch.0.00m-360m. iii Palsading 120m. Under Agailjhara upazila District Barishal. BDRIDP agailjhara "506024009 506025045 " 15112800.00 0.00 0 08/04/2019
24 BDRIDP/BAR /AGL/CCA-Rd/01 Improvement of Road by BC from Rathkhola Bazar-Bhadrapara Road (ch. 0m-1000m) Under Agailjhara Upazila, District-Barisal. BDRIDP agailjhara 1.00 50.98 M/S Talukder Enterprise 56.00 30/10/2014 30/04/2015 100 Final
25 BDRIDP/BAR/AGL/CCA-Rd(R)/06 Rehabilitation of road from Temar Bastala to Hawla bridge via Nagar GPS-Talbazar-Oichermath bazar road by BC from Ch. 3840m-4840m with 3 Nos U-Drain at Ch. 4410m, 4590m & 4740m. BDRIDP agailjhara 1.00 49.14 M/S Sharif Enterprise 51.58 29/04/2015 28/01/2016 100 Final
26 BDRIDP/BAR/AGL/CCA-St/01 Construction of road from 2 vent 4.00m×4.00m RCC Box Culvert on Ashkor Puraton Kalibari Baily Bridge to Kishore Bissas's house road at Ch. 841m with Dranage Culvert at Ch. 930m. BDRIDP agailjhara 16.78 M/S Sharif Enterprise 17.72 100 Final
27 BDRIDP/BAR/AGL/UN-Rd(R)/01 Rehabilitation of road from Goila (DR) to Teimukhi via Bakal hat & Kodaldhoa bazar road by BC form Ch. 11192m-13954m. BDRIDP agailjhara 2.76 147.39 M/S Sharif Enterprise 155.93 30/05/2015 100  
28 BDRIDP/BAR/AGL/UZ-Rd/02 Improvement of road from Paisharhat GC to Shatla GC via Bagdha GC road by BC from Ch. 3800m-5800m. BDRIDP agailjhara 2.00 107.71 M/S Sraboni Construction 112.88 100 Final
29 BDRIDP/BAR/AGL/CCA-Rd/03 Improvement of road from Boro Magra Sluice to Ramshil Bazar via Kodaldhoa road by BC from Ch. 0.00m-1000m with on Boromagra Stuice to Ramshil Bazar via Dodaldhoa road from Ch. 280m BDRIDP agailjhara 1.00 60.17 M/S Sarniabad Enterprise 63.76 100 Final
30 BDRIDP/BAR/AGL/CCA-Rd/04 Improvement of road from Poiser hat GC-Ramshil Bazar via Trimukhi road by BC from Ch. 0.00m-1000m. BDRIDP agailjhara 1.00 49.26 M/S Shafique Brothers 55.39 28/05/2015 28/11/2015 100 Final
31 BDRIDP/BAR/AGL/CCA-Rd(R)/05 Rehabilitation of road from Ashkor Puraton Kalibari Baily Bridge to Kishore Bissas's house road from Ch. 0.00m-1200m. BDRIDP agailjhara 1.20 41.59 M/S Helal Traders 44.00 100  
32 BDRIDP/BAR/AGL/UZ-Rd(R)/01 Rehabilitation of Barthi - Valukshi - Magura- Ambari-Bakalhat road by BC at ch.5870-7880m. BDRIDP agailjhara 2.01 127.47 M/S Santu Traders 133.83 15/07/2015 14/07/2016 100 Final
33 BDRIDP/BAR/AGL/CCA-Rd/07 Improvement of road from Biplob Serniabad House to Hazi Musa House road By BC from ch.00-400m. BDRIDP agailjhara 0.40 19.17 M/S Serniabad Enterprise 20.13 100 Final
34 BDRIDP/BAR/AGL/CCA-Rd/ 02 Improvement of road from Seral - Goila road via Shahid Serniabad House - Tamer Jame Mosjid(Tamer Girls High School-Seral Community Center) by BC (Ch.0.0 - 975m) under Agailjhara Upazila,Barisal. BDRIDP agailjhara 0.98 72.33 M/S Serniabad Traders 72.30 16/03/2017 16/10/2017 100 Final
35 BDRIDP/BAR/AGL/CCA-EW/01 Resectioning of Road from Seral-Goila road via Shahid Serniabad House-Tamer Jame Mosjid (Tamer Girls High School-Seral Community Center) by Earth at Ch. 0.00m-975m. BDRIDP agailjhara 0.98 3.18 Md. Babul Sikder 3.18 30/03/2017 30/04/2017 100  
36 BDRIDP/BAR/AGL/CCA-EW/02 Improvement of road from Ashkor Puraton Kalibari Baily Bridge to Kishore Bissas’s House by Earth work from Ch. 00-1200m under Agailjhara Upazila, Barisal. BDRIDP agailjhara 1.20 4.49 Abdul Hakim Molla LCS No-1 2.17 30/04/2015 100  
37 BDRIDP/BAR/AGL/CCA-EW/03 Resectioning of road from Temar Bastala to Hawla Bridge via Nagar GPS-Talbazar-lichermath Bazar road from Ch. 3840-4840m. BDRIDP agailjhara 1.00 3.45 Nolini Halder LCS No-1 3.45 15/01/2017 30/04/2017 100  
38 BDRIDP/BAR/AGL/UZ-EW/01 Improvement of road from Paisharhat GC to Shatla GC via Bagdha GC road by Earth work from Ch. 3800-5800m under Agailjhara Upazila, Barisal. BDRIDP agailjhara 2.00 10.92 Md. Sohrab Howlader LCS No-1 1.24 20/02/2015 30/04/2015 100 Final
39 BDRIDP/BAR/AGL/UN-EW/01 Improvement of road from Goila (DR) to Teimukhi via Bakal hat & Kodaldhoa bazar road by Earth work form Ch. 11192-13954m under Agailjhara Upazila, Barisal. BDRIDP agailjhara 2.76 16.05 Mahim Baishnab LCS No-1 2.01 20/02/2015 30/04/2015 100  
40     BDRIDP agailjhara 16.05 Pangkoj Joydhor LCS No-7 2.06 20/02/2015 30/04/2015 100  
41 BDRIDP/BAR/BAB/CCA-RdR/06 Improvement of Road from Telerchar GPS -Najamrari Bari - Jahungirnagar UP road Start ch.1700m Satter Mirar Bari -Thakur. From Ch.0.0m - 550mSalvaged Cost Tk 192766.00 BDRIDP babuganj "506035103 506034109" 35.08 M/S Niaz Traders 31.57 18/01/2018 18/07/2018 50 08/04/2019  
42 BDRIDP/BAR/BAB/CCA-Rd/07 Improvement of road from Jahapur Shilondia Bridge -Uttor Mujafforpur Peda Master bari under Jahangir Nagar Union a Bituminous Surfacing -wearing courseDC ch.190m -1190m b 1No. 2.0m x 2.0m & 1No.1.0m x1.0m RCC Box Culvert at Ch.273m & 615m under Babuganj U BDRIDP babuganj 506035018 1.00 69.55 M/S Amir Engineering Corporation 64.50 100 08/04/2019  
43 BDRIDP/BAR/BAB/UN-Ew/01 Improvement of road from Dehergothi UP office to Kalir Bazar road by Earth Work from Ch. 1960m-3710m. BDRIDP babuganj 1.75 1.96 Md. Masum Hossain GaziLCS No-1 1.96 15/05/2015 30/09/2015 100 08/04/2019  
44 BDRIDP/BAR/BAB/CCA-Ew/01 Improvement of road Shajahan Sikder Farm to Najam Mridha House via Idel Kathi High School By Earth Work under Dehergothi UP at Ch. 0.00m-2+350km. BDRIDP babuganj 2.35 2.85 TaslimaLCS No-1 2.85 15/05/2015 30/09/2015 100 08/04/2019  
45 BDRIDP/BAR/BAB/CCA-Ew/02 Improvement of road Dehergothi in High School-Rahamotpur Krishi College via Khalik member's house by Earth Work under Dehergothi UP at Ch. 0.00m-4+320km. BDRIDP babuganj 4.32 3.81 Rajib HossainLCS No-1 3.81 15/05/2015 30/09/2015 80 08/04/2019  
46 BDRIDP/BAR/BAB/CCA-Ew/03 Improvement of road Jayinpur madrasha to Dhaka Barisal RHD via Molla Bari by Earth Work under Dehergothi UP at Ch. 0.00m-2+600km. BDRIDP babuganj 2.60 3.01 Md. Liton HossainLCS No-1 3.01 15/05/2015 30/09/2015 100 08/04/2019  
47 BDRIDP/BAR/BAB/CCA-EW/04 Improvement of road From Daroger hat to Shandha river bank via Battala Bazar road by Earth work from Ch. 0.00m-3900m. BDRIDP babuganj 3.90 3.55 Md. Kabir SikderLCS No-1 3.55 15/05/2015 30/09/2015 100 08/04/2019  
48 BDRIDP/ BAR/BAB/ CCA-Rd/08 Improvement of Road from Ramjankathi GPS to Charalgi GPS. a Earthwark from Ch. 0- 1500m.b Carpeting DC from Ch. 0- 1500m.c Construction of 2 Nos 625mmx600mm U-Drain at Ch. 736m & 1285m.d Palisading Work 150.00m. Under Babuganj District- Barishal. BDRIDP babuganj 506035132 11562581.00 0.00 0 08/04/2019 E-Tender Under Process.
49 BDRIDP/ BAR/BAB/ CCA-Rd/09 Improvement of from Khudrokathi Freedom Fighter Mogibor Rahaman Sikder House to Baige Comander Abdul Mojid Khan house. At Ch. 00m-1100m.Salvaged Cost Tk 285357.00i Earthwark Ch.0.00m-1100m.ii Carpeting DC Ch.0.00m-1100m. iii Construction of 02 Nos 0.625mx0.600m U-Drain. at Ch.110m & 400m.iv Palsading 46m.Under Babuganj Upazila Barishal District. BDRIDP babuganj 506034155 7945251.00 0.00 0 08/04/2019 E-Tender Under Process.
50 BDRIDP/BAR/BABU/CCA-Rd/01 Improvement of road from Babugonj Agorpur GC to Mr. Younusur Rahman (Divisional Commissioner) house via Clubgonj hat by Carpeting from Ch. 750-1400m & 0.00-1550m. BDRIDP babuganj 0.80 97.92 M/S Lutful Kobir 107.50 17/07/2014 16/04/2015 100 Final
51 BDRIDP/BAR/BAB/CCA-Rd(R)/02 Rehabilitation of road Shajahan Sikder Farm to Najam Mridha House via idel Kathi High School by Carpeting under dehergothi UP at Ch 00-2+350km. BDRIDP babuganj 2.35 97.19 M/S Atique Construction 101.73 100 Final
52 BDRIDP/BAR/BAB/CCA-Rd(R)/03 Rehabilitation of road Dehergothi in High School-Rahamotpur Krishi College via Khalik member's house by Carpeting under Dehergoti UP at Ch. 00m-4+320km BDRIDP babuganj 4.32 185.18 M/S Atique Construction 193.87 100 Final
53 BDRIDP/BAR/BABU/CCA-Rd/04 Improvement of road Jayinpur Madrasha to Dhaka Barisal RHD via Molla Bari by Carpeting under dehergoti UP at Ch. 00-2+600km. BDRIDP babuganj 2.60 99.59 M/S Atique Construction 104.29 100 Final
54 BDRIDP/BAR/BAB/CCA-St/01 Construction of 4Nos RCC Box Culvert on road Shajahan Sikder Farm to Najam Mridha House via Idel Kathi High School Under Dehergothi UP at Ch 248m, 715m, 1414m & 1543m. BDRIDP babuganj 29.32 M/S Atique Construction 30.71 100 715wgt †PB‡b‡R KvR Kiv hv‡e bv|
55 BDRIDP/BAR/BAB/CCA-St/02 Construction of 11Nos RCC Box Culvert on road from Dehergothi in High school-Rahamotpur Krishi College via Khalik member's house under Dehergothi UP at Ch. 797m, 1455m, 1602m, 1875m, 1965m, 2362m, 2535m, 2655m, 4140m & Link road 2250m & 380m. BDRIDP babuganj 47.44 M/S Atique Construction 49.69 100  
56 BDRIDP/BAR/BAB/CCA-St/03 Construction of 5Nos RCC Box Culvert on road Jayipuri Madrasha to Dhaka Barisal RHD via Molla Bari Under Dehergothi UP at Ch. 1135m, 1612m, 2272m, 2375m, 2540m. BDRIDP babuganj 20.01 M/S Atique Construction 20.96 100  
57 BDRIDP/BAR/BAB/CCA-St/04 Construction of 3.00m×3.00m 3 Nos 1.00m×1.00m 1Nos 2.00m×2.00m RCC Box Culvert on Daroger hat to Shandha river bank via Battala Bazar road at Ch. 33m, 2820m, 2980m, 3155m & 1785m. BDRIDP babuganj 19.82 M/S Atique Construction 20.76 100  
58 BDRIDP/BAR/BAB/UN-St/01 Construction of 2 Nos 2.00×2.00m 1 No 1.60m×1.60m 1No 1.00m×1.00m RCC Box Culvert on Dehergothi UP office to Kalir Bazar road at Ch. 2475m, 2693m, 2860m & 3035m. BDRIDP babuganj 14.43 M/S Lutful Kobir 10.30 25/10/2015 100 Final
59 BDRIDP/BAR/BAB/UN-Rd(R)/01 Rehabilitation of road from Dehergothi UP office to Kalir Bazar by BC from Ch. 1930m-3710m. BDRIDP babuganj 1.78 64.57 M/S Alvi Construction 51.94 100 Final
60 BDRIDP/BAR/BAB/CCA-Rd/05 Improvement of road from Daroger hat to Shandha river bank via Battala bazar road By BC from Ch. 00-3800m under Babuganj Upazila, Barisal District. BDRIDP babuganj 3.80 143.08 M/S Atique Construction 149.79 100 Final
61 BDRIDP/BAR/BAB/UN-RD/02 Improvement of Road from Agorpur UP Office (Chairman Hat) to Miar Hat via Jahapur under Jahangirnagor (Agorpur) UP at Ch. 0.00m-2110m BDRIDP babuganj 2.11 124.21 M/S Hasan Construction 115.70 29/11/2016 28/06/2017 100 Final
62 BDRIDP/BAR/BAB/UN-St/02 Construction of No 6.00m Span OFC, 3 Nos 2.00m×2.00m & 2 Nos 1.60m×1.60m RCC Box Culvert on Road From Agorpur UP Office (Chairman Hat) to Miar Hat via Jahapur under Jahangirnagor (Agorpur) UP at Ch. 0.00m, 0.00m, 125m, 1101m, 1907m & 708m. BDRIDP babuganj 41.83 M/S Saifuddin Traders 41.80 20/11/2016 19/09/2017 100 Final
63 BDRIDP/BAR/BAB/UN-EW/02 Resectioning of Road from Agorpur UP Office (Chairman Hat) to Miar Hat via Jahapur under Jahangirnagor (Agorpur) UP at Ch. 0.00m-2110m BDRIDP babuganj 2.11 2.91 Md. Habibur Rohman LCS No-1 2.91 20/06/2016 20/10/2016 100  
64 BDRIDP/BAR/BAK/CCA-Rd/01 Improvement of road from South side Dhola Sluice Gate to Alim Meridha Bari (Vary) via Sikder Bari, Manik Member Bari, Shatghor & Mannan Princhpal Bari (East side of Hanua Bridge to Shatghor via Shikder Bari) By HBB from Ch. 0.00-1013m. BDRIDP bakerganj 506075221 1.01 35.59 M/S Nahid Enterprise 39.86 24/07/2014 24/01/2015 100 08/04/2019 Final
65 BDRIDP/BAR/BAK/UN-Rd(R)/01 Rehabilitation of Road from Kalaskati UP Office (Vumi Office) to Arshed Khayaghat via Kumarbari Bridge & Bagdia GPS road By BC from Ch. 00-1000m. (Salvage Cost Tk. 9,46,801.00) e-ID : 22666 BDRIDP bakerganj 506073023 45.67 M/S Khondokear Brothers 35.24 28/07/2015 27/04/2016 75 08/04/2019  
66 BDRIDP/BAR/BAK/CCA-Rd/03 Improvement of Dudhalmou Ferryghat(RHD) to Kanki Govt.Pry.School Road by Earth Work and HBB under Bakergonj Upazila, District -Barisal. BDRIDP bakerganj 506074120 176.42 Md. Sumsudhoa Mollick 161.39 28/12/2016 27/06/2017 100 08/04/2019  
67 BDRIDP/BAR/BAK/CCA-Rd/04 Improvement of road from west Faridpur Ajgor Sikder Bari to DC road Ferry-ghat via H/O Rahim Mrida Road, a Earth Work from Ch. 0.0 - 1300.00m. b Bituminus Carpeting from Ch. 0.0 - 1300m c Construction of 1 No. 4.0m x 4.0m RCC Box Culvert at Ch. 425m. unde BDRIDP bakerganj 506074151 1.30 99.94 M/S Islam Brothers 89.95 100 08/04/2019  
68 BDRIDP/BAR/BAK/CCA-Rd(R)/05 Improvement of road from ATIMKHANA to Bothra Road via Mr. Matiur Rahman (ASP) at Ch. 0.00m-500.00m (Efective Length= 475.00m) (ID No.506074225) under Bakergonj Upazila, Dist : Barisal [Salvaged cost : Tk1049647.00] BDRIDP bakerganj 0.50 33.05 M/S Osin Enterprise 29.74 24/01/2018 24/05/2018 100 08/04/2019  
69 BDRIDP/BAR/BAK/CCA-Rd/07 Improvement of road from Sampur Ray Barir Culvert to Birangal Digirpar Kader Hohlade Bari via Karim Gaji Bari a Earth work 0.0 - 1500m b Bituminous Surfacing - wearing course DC 0.0m - 1500m c 1.5 m x 1.5m RCC Box Culvert at Ch.900m BDRIDP bakerganj 506075125 1.50 91.26 M/S Abul Kalam Azad 82.13 29/01/2018 29/10/2018 60 08/04/2019  
70 BDRIDP/BAR/BAK/CCA-Rd/09 Improvement of Aulia DargabariRHD to Shyampur Hat via Dhokati Madrasha & Dhokati Govt.Pry.school Auliapur Dargabari RHD-Sampur Road Howlader Bari Trimohini to Syampur Hat via Ali Khan Bari a Earth work at Ch.4500-6000m b Carpeting BC at Ch.4500 - 6000m c BDRIDP bakerganj 506074119 1.50 147.92 Md. Nasir Uddin 137.43 100 08/04/2019  
71 BDRIDP/BAR/BAK/UZ-Rd/01 Improvement of Rahamgonj RHD via Dhokati GPS & Bakergonj-Sampur Road to BoaliaGC Bakergonj-Sampur Road Mill Ghar to Auliapur Dargabari RHD-Sampur Road Howlader Bari Trimohini a Earth work at Ch.1913-2775mb CarpetingBC at Ch.1913-2775mc Construction of 1No BDRIDP bakerganj 506072014 0.86 85.83 M/s Kazi Holdings 79.95 90 08/04/2019  
72 BDRIDP/BAR/BAK/Gha/01 Construction of Ghatla at Kaligonj Bazar Khal under Bakergonj Upazila Barisal . BDRIDP bakerganj 19.33 M/S S H Enterprise 18.85 40 08/04/2019  
73 BDRIDP/BAR/BAK/CCA-RdR/10 Improvement of Road from Hanua UP Office Bridge to Sarder Bari Foot Bridge via Jainpuri Khanka Sarif Bari & Khodaboxkati Eshak Member Bari Char a Earth work at Ch.0.0 - 2000m b CarpettingBC Ch.0.0 -2000m c Construction of 1 No Box culvert 1.0m x 1.0m at ch.1310m d Protective worksPalisading 60m under Bakergonj UpazilaBarishal District. Salvaged Cost TK.1943192.00 BDRIDP bakerganj 506074199 2.00 1.00 14520624.67 M/S Sikder Enterprise 0.00 15 08/04/2019
74 BDRIDP/BAR/BAK/UN-EW/01 Improvement of road from Kalaskati UP Office (Vumi Office) to Arshed Khaya Ghat via Kumarbari Bridge & Bagdia Govt. Pry. Schoo. Road by Earth Filling Work at Ch. 00m-4870m. BDRIDP bakerganj 506073023 4.87 2228745.00 0.00 16/04/2015 100 08/04/2019
75 BDRIDP/BAR/BAK/UZ-St/01 Construction of 23.00m Long RCC Girder Bridge over road from Kamarkali GC to Baharchar GC via Sarsi Pollice Farry Patkati L/G Faridpur UP Office & Janota Bajarat at Ch. 5847m Under Bakerganj Upazila District Barisal Road ID 506072012 BDRIDP bakerganj 506072012 23.00 13048406.72 M/S SUN TRADERS 12395986.38 23/08/2018 23/08/2018 04/08/2019 80 08/04/2019
76 BDRIDP/BAR/BAK/CCA-Rd/11 Improvement of Road from Goma Amtala to Chatra Hat via Gajir Hat DKP High School & Sowdakar Bari Road by BC at Ch. 1600m-2100. Effective Length 500m.Under Bakerganj Upazila District- Barishal. BDRIDP bakerganj 506074136 0.50 3243472.30 0.00 0 08/04/2019
77 BDRIDP/BAR/BAK/CCA-Rd/12 Improvement of road from Kabiraj Altaf Chairman Bari near Madrasha to East Dhudal Community Pry School via Shahajahan Howlader & Alomgir Mollik Bari road by BC Ch. 736m-2000m. Under Bakerganj Upazila District- Barishal. BDRIDP bakerganj 506074148 1.26 8566686.78 0.00 0 08/04/2019 Tender Process
78 BDRIDP/BAR/BAK/CCA-Rd/13 Improvement of Road from Kabai Dhola Riazuddin Madrasha to Khodaboxkati Govt. Pry. School by BC work at Ch.00m-500 with 1 No. 900mx900m U-Drain. Under Bakerganj Upazila District- Barishal. BDRIDP bakerganj 506075432 0.50 0.90 3857006.71 0.00 0 08/04/2019 Tender Process
79 BDRIDP/BAR/BAK/CCA-Rd/14 A Improvement of road from Rabipur Ali Hossain Khan Bari UZR to Sharif Bari via Ayeb Boyati Bari i Earthwork Ch.0.0m-500m ii CarpetingDC Ch.0.0 - 500m.iii Palisading work-50m B Improvement of road from S/Side of Kabai HatNear Chunakhali Sluice Get to E/S of Pearpur Iron BridgeUZR via Chunakhali HatDhola Madrasa & Dhola Sluice Get i Earthwork Ch.4000m-5000m ii Carpeting DC Ch.4000m-5000m iii Construction of 2Nos 1.0m x 1.0m Box Culvert at Ch.4666m 4951m & 1No. U-Drain at Ch.4830m iv Palisading work-55m Under Bakergonj Upazila Barishal District BDRIDP bakerganj "506075099 506074155" 2.00 3.00 11940345.81 0.00 0 08/04/2019 Tender Process
80 BDRIDP/BAR/BAK/CCA-Rd/15 Improvement of road East Bathsala UZR to Dhulia River Bank via Bathsala Karikornagar GPS infront of Amir Khan Bari Mosque Salvaged Cost Tk 331586.00 i Earthwark Ch.0.00m-1450m. ii Carpeting DC Ch.0.00m-1450m. iii Construction of 01 No U-Drain 0.9mx0.9m at Ch.1250m.iv Palasading 79m. Under Bakergonj Upazila Barishal District. BDRIDP bakerganj 506075379 1.45 0.90 10466500.00 0.00 0 08/04/2019 Ternder Process
81 BDRIDP/BAR/BAK/CCA-Rd/16 Part A Improvement of road from H/O Sujauddin Halta F.H. high School. Halta Mouza Sholoshath to Surath Memorial GPS. i Earthwark Ch.0.00m-850m. ii Carpeting DC Ch.0.00m-850m. iii Construction of 02 Nos RCC Culvert1.6mx1.6m at Ch 4m845m 3 Nos U-Drain 0.9mx0.9m at Ch.120m190m235m.iv Palsading 96mPart B Improvement of road from Mokimabad Bajar S/Side of Culvert to East Side of BIP Siuce Get via Dilip Master Bari.Oza Bari to Thakur Bari via Naboraz Biswas bari i Earthwark Ch.2500m-3250m. ii Carpeting DC Ch. 2500m-3250m. iii Construction of 01 No RCC Culvert 1.6mx1.6m at Ch 3125m.iv Palsading 38m.Under Bakergonj Upazila District Barishal. BDRIDP bakerganj "506075180 506075229" 0.75 1.60 14776000.00 0.00 0 08/04/2019
82 BDRIDP/BAR/BAK/CCA-Rd/17 Part A Improvement of road from Padrishibpur GPSUZR to Bismillah Bazar via Sikder Bari Kowabunia khal & Dhulal sadu Bari Salvaged Cost Tk 921459.76i Earthwark Ch.0.0m-900m. ii Carpeting DC Ch. 0.0 - 900m. iii Construction of 01 No 2.0 m x 2.0m RCC Box Culvert & 1No.U-Drain at Ch 482m.& 28m iv Palsading 59m.Under Bakergonj Upazila District Barishal. Part B Improvement of road from East side of Bangla bazar Box Culvert to Wapder Khal Ghorar Bridge Bothra via Biharipur Madrasha road. i Earthwark Ch.3250m-3850m. ii Carpeting DC Ch.3250m-3850m. iii Construction of 01 No 2.0 m x 2.0m RCC Box Culvert at Ch.3255m & 01 No 1.6 m x 1.6m RCC Box Culvert at Ch.3716m iv Palsading 28m.Under Bakergonj Upazila District Barishal.Part C Improvement of road from Padrishibpur Sunddartala Baily Bridge UZR to Aowal Sikderbari i Earthwark Ch.0.0m-500m. ii Carpeting DC Ch. 0.0 - 500m. Under Bakergonj Upazila District Barishal. BDRIDP bakerganj "506074057 506074182 506075155" 1.90 16443000.00 0.00 0 08/04/2019
83 BDRIDP/ BAR/BAK/ CCA-Rd/18 Improvement of Road UZR Rabipur GPS UNR Younous Sharif Bari Via Rabipur. Salvaged Cost Tk 641271.00i Earthwark Ch.0.00m-500m. ii Carpeting DC Ch.0.00m-500m. iii Palsading 50m. Under Bakergonj Upazila Barishal District. BDRIDP bakerganj 506074267 3691293.00 0.00 0 08/04/2019
84 BDRIDP/BAR/BAK/UN-St/01 Construction of RCC Box Culvert over road from Kaloskati UP Office (Vumi Office) to Arshed Khayaghat via Kumarbari Bridge & Bagdia GPS with 7 Nos. 1.60mx1.60m at Ch. 850m, 1110m, 1456m, 1608m, 2507m, 3520m, 4245m & 2 Nos. 2vent 4.00mx4.00m at Ch. 1242m & BDRIDP bakerganj 73.40 M/S Khondokear Brothers 53.45 21/06/2015 20/06/2016 100 Final
85 BDRIDP/BAR/BAK/UN-Rd(R)/02 Improvement of road from Kalaskati UP Office (Vumi Office) to Arshed Khayaghat via Kumarbari Bridge & Bagdia GPS road By BC from Ch. 1000m-4870m. e-ID : 22667 BDRIDP bakerganj 180.93 M/S Khondokear Brothers 146.83 100 Final
86 BDRIDP/BAR/BAK/CCA-Rd(R)/02 Rehabilitation of road from Gavikola Mannan Sikder Bari Foot Bridge to West side of Nilganj Foot Bridge via Moksad Khan,Kumarghudi & Kaptain Saye Bari by BC from Ch.00-810m [Salvaged Value Tk.10,53,654.00] e-ID : 29366 BDRIDP bakerganj 0.81 35.54 Md. Nasir Uddin 26.20 100 Final
87 BDRIDP/BAR/BAK/UN-Rd/03 Improvement of road from Faridpur Hat Kheya Ghat Durgapasa UP office Gobindapur Bothtala via Kakordha Bazar Road, a Earth Work from Ch. 4860m 7320m.b Bituminus Carpeting from Ch. 4860m 7470m.c Construction of 1 No. 1.60mx1.60m RCC Box Culvert at Ch. 7435 BDRIDP bakerganj 2.46 164.60 Md Mafuz Khan 148.14 30/11/2018 100  
88 BDRIDP/BAR/BAK/CCA-Rd/06 Improvement of road from Shashi Bazar Bridge-Telani Lunch Ghat Najrul Talukder Bari. under Bakergonj Upazila Dist:Barisal. a) HBB from Ch. 00m-1000m b) Protection Work 108m c) Earth work from Ch. 00m-1000m BDRIDP bakerganj 1.00 46.09 Md. Zakir Hossain Mia 45.63 24/01/2018 24/07/2018 100  
89 BDRIDP/BAR/BAK/CCA-Rd/08 Improvement of Extended Portion of Dudhalmou Ferryghat (RHD) to Kanki Govt. Pry. School Road (Connecting Road Sheikh Hasina Cantonment). BDRIDP bakerganj 43.33 M/S Amir Engineering Corporation 28.78 20/01/2018 15/02/2018 100 Final
90 BDRIDP/BAR/BAN/UZ-Rd/01 Improvement of road from Banaripara - Harta, At Ch.5865 -6865m under Banaripara Upazila, District Barisal. BDRIDP banaripara 1.00 70.14 M/S Saleha Enterprise 53.50 50 08/04/2019  
91 BDRIDP/BAR/BAN/UZ-St/01 Construction of 1No.2.0m x 2.0m ,1 No.3.0m x 3.0m , 2Nos.4.0m x 4.0m , 1No.1.0m x 1.0m RCC Box Culvert & 3 Nos 0.625m x 0.625m U-Drain at Ch.5950m, 6787m, 6145m, 6230m, 6407m, 5871m, 6555m & 6622m on Banaripara-Harta Road. BDRIDP banaripara 75.32 M/S Soma Enterprise 54.62 100 08/04/2019  
92 BDRIDP/BAR/BAN/UZ-St/02 Construction of 15.00m RCC Girder Bridge on Banaripara to Harta road at ch.8642km over B.Bari Khal under Banaripara UpazilaBarisal District BDRIDP banaripara 118.50 Md Mahfuz Khan 106.65 90 08/04/2019  
93 BDRIDP/BAR/BAN/UZ-St/03 Construction of 15.00m RCC Girder Bridge on Banaripara to Harta road at ch.7162 km over Onil Ghat Khal under Banaripara UpazilaBarisal District BDRIDP banaripara 98.14 Md Mahfuz Khan 88.33 70 08/04/2019  
94 BDRIDP/BAR/BAN/Gha/01 Construction of RCC Ghat at Mohish Katakhali Kheya Ghat under Banaripara Upazila Barisal . BDRIDP banaripara 29.12 M/S Amir Engineering Corporation 26.21 20 08/04/2019  
95 BDRIDP/BAR/BAN/UZ-EW/01 Resectioning of Banaripara-Harta Road at Ch. 4665m-6066m. BDRIDP banaripara 1.40 4.42 Zakir HossainLCS No: 1 4.42 30/03/2017 100 08/04/2019  
96 BDRIDP/ BAR/BAN/ CCA-Rd/01 Improvement of road by BC Gordder Abu Taher Shop to Kachua Madrasha. Salvaged Cost Tk 448135.00i Earthwark Ch.600m-1600m. ii Carpeting DC Ch.600m-1600m. iii Construction of 03 Nos. 1.5mx1.5m Box Culvert at Ch.667m742m & 938m & U-Drain 0.6mx0.6m at Ch.870m973m & 1550m. under Banaripara UpazilaBarishal District BDRIDP banaripara 506105098 8974998.00 0.00 0 08/04/2019 E-Tender Under Process.
97 BDRIDP/BAR/SDR/CCA-Rd(R)/05 Rehabilitation of road from Jaliabari Pool via Mujaffar Hazi Bari road by BC from Ch. 0.00m-2782m. BDRIDP barishal-s 506514048 2.78 109.10 M/S Hasan Construction 87.73 17/05/2015 17/02/2016 100 08/04/2019  
98 BDRIDP/BAR/SDR/UZ-Rd/01 Improvement of Shehaber Hat Singherkati Chandramohon road from Ch. 729m - 1308m.under Sadar Upazila Barisal. BDRIDP barishal-s 506512003 0.58 42.10 M/S Niaz Traders 37.89 70 08/04/2019  
99 BDRIDP/BAR/SDR/CCA-Rd(R)/11 Improvement of road from Charmonai Talukder Bari-West Razarchar Club by BC. at Ch. 0.00m-1203.00m under Charmonai Union, Upazila : Sadar, Dist-Barisal [Salvaged cost- Tk 231155.00] BDRIDP barishal-s 506515109 1.20 87.69 M/S Kohinoor Enterprise 78.92 25/01/2018 25/11/2018 40 08/04/2019  
100 BDRIDP/BAR/SDR/Gha/01 Construction of Ghat & CC Road at Shaheber Bazar under Sadar Upazila Barisal . BDRIDP barishal-s 32.79 M/S S H Enterprise 31.03 05/05/2018 12/05/2018 12/11/2018 20 08/04/2019
101 BDRIDP/BAR/SDR/CCA-Rd/13 Improvement of Shibpasha Sarder bari Sholna Tarunclub Road Road Part-A Earth work at Ch. 0.00 -1505.00m Part-B Carpeting BC work at Ch. 0.00-1505.00m Salvage Amount Tk. 2626839.00 Part-C Construction of 2Nos U-Drain 1.00mx1.00m at Ch. 140m & 380m Under B BDRIDP barishal-s 506514007 1.51 106.04 M/S Noor & Sons 100.74 18/06/2018 18/05/2019 35 08/04/2019  
102 BDRIDP/BAR/SDR/CCA-RdR/14 Improvement of Shibpasha Sarder bari-Sholna Tarunclub road a Earth work at Ch.1505-2392m b Carpetting BC Ch.1505 -2392m c Construction of 1 No Double vent Box culvert 4.0m x 4.0m at ch.1901m d Protective worksPalisading 134m e Link Road Baitul Mamur Jame BDRIDP barishal-s 0.82 101.12   0.00 0 08/04/2019 E-Tender Under Process.
103 BDRIDP/BAR/SDR/CCA-EW/04 Resectioning of Road from Shaheber Hat to Bairagibari via Gourchandar Bridge (Bisharad GPS cum CS) at Ch. 2557m-3280m. BDRIDP barishal-s 4.09 7.52 Md. Hemayet HowladerLCS No-1Md. Mojibor Rohman SikderLCS No-2Mosharof Hossain ShikderLCS No-3 7.52 28/03/2017 30/04/2017 70 08/04/2019 10 % 100% 100%
104 BDRIDP/BAR/SDW/UZ-Ew/01 Resectioning of Shehaber Hat-Singherkati Chandramohon Road at Ch. 1009m-1309m BDRIDP barishal-s 506512003 12.09 3.56 LCS No-2 3.56 100 08/04/2019 Final
105 BDRIDP/BAR/SDR/CCA-Rd/10 Improvement of Road from Shaheber Hat to Bairagibari Via Gourchandra Bridge (Bisharad GPS cum CS) from Ch.5103 - 6647m including 1 No.1.0m x1.0m U-Drain & 1No.3.m x 3.0m RCC Box Culvert at Ch.5479m & 6141m under Sadar Upazila,Barisal. BDRIDP barishal-s 506514137 1.54 4.00 9500469.00 M/S Sirajul Alam Sikder 8550422.10 22/05/2017 29/05/2017 08/04/2019 65 08/04/2019
106 BDRIDP/BAR/SDR/UN-Rd/01 a .Improvement of road from Gilatali Kheyaghat - Biswasher hat via Model Madrasha. from Ch.1500 - 4260m under Sadar UpazilaDistrict-Barisal. b. Construction of 3 Nos 1.6m x 1.6m RCC Box culvert at ch.2568m 3530m & 4033m and 1No.4m x4m RCC Box Culvert at ch.3640m on the same road. BDRIDP barishal-s 506513003 2.76 5.00 18760504.00 Md Mafuz Khan 16884454.00 18/01/2018 18/01/2018 30/11/2019 20 08/04/2019
107 BDRIDP/BAR/SDR/CCA-Rd/04 Improvement of road from Chownatha Toabu Chowkider Bari via Clinic road by BC from Ch. 0.00m-1000m with 1 No 1.60m×1.60m Box Culvert at Ch. 366m. BDRIDP barishal-s 506514059 1.00 45.44 M/S Lutful Kabir 40.37 100 15/04/2015 Final
108 BDRIDP/BAR/SDR/UN-St/01 Construction of 20.00m Long RCC Girder Bridge on Nishatala Tunglbaria UP office-Shaheberhat via Bisharad road at Ch. 136m. BDRIDP barishal-s 506513002 0.02 20.00 0 127.73 M/S Rupali Construction 100.88 11/03/2015 17/03/2015 17/03/2016 100 0 15/04/2015  
109 BDRIDP/BAR/SDR/CCA-EW/01 Rehabiliation of road from of Narokati Altaf Mollah Bari-Moslem Howlader Dokan via GPS (Narokati GPS) road by BC from Ch. 0.00m-732m. BDRIDP barishal-s 506514059 0.73 30 2.38 Md. Giush Uddin LCS No-1 2.38 29/01/2015 15/02/2015 30/04/2015 100 0.71 30 15/04/2015 Final
110 BDRIDP/BAR/SDR/CCA-Rd/01 Improvement of Bukhainagar Bridge to Abdul Aziz Khan's House via Shaluka GPS Road (Ch. 00-500m). BDRIDP barishal-s 506514170 0.50 0 20.46 M/S Talukder Enterprise 16.13 09/06/2014 16/06/2014 16/09/2014 100 0.00 0 31/03/2015 Final
111 BDRIDP/BAR/SDR/CCA-Rd/02 Improvement of Chandpura Mojidderhat-Saheberhat via Khontakhali School road from Ch. 1635-3192m. BDRIDP barishal-s 506514154 1.56 0 74.67 M/S G M Construction 62.80 10/08/2014 17/08/2014 16/05/2015 100 0.00 0 31/03/2015 Final
112 BDRIDP/BAR/SDR/CCA-Rd/03 Improvement of Road form Karnakathi Puraton Hat-Char Aicha Sabuz Memerer Bari By BC Ch. 0.00-513m BDRIDP barishal-s 506514148 0.51 0 28.10 M/S Serajul Islam Hanif 22.94 24/07/2014 100 0.00 0 31/03/2015 Final
113 BDRIDP/BAR/SDR/CCA-St/04 Construction of 4 Nos 2.00×1.60m Box Culvert on Jaliabari Pool via Mujaffar Hazi Bari road at Ch. 391m, 910m, 1740, & 1860m. BDRIDP barishal-s 13.34 M/S Khondokar Borthers 10.27 28/07/2015 27/01/2016 100 Final
114 BDRIDP/BAR/SDR/CCA-St/02 Construction of 1.0 x 1.0m and 1.6 x1.6m RCC Box culvert on Kasem Defader Bari - Karnokati High School & College road at ch.773m & 526m e-ID: 17457 BDRIDP barishal-s 5.16 M/S Khondokar Borthers 4.28 23/06/2015 22/12/2015 100 Final
115 BDRIDP/BAR/SDR/CCA-Rd(R)/06 Rehabilitation of road from Kasem Defader Bari - Karnokati High School & College road By BC from ch.310 - 1125m under Sadar upazila ,Barisal District [Salvaged Cost-Tk 4,97,038.00] BDRIDP barishal-s 0.82 33.86 M/S Oshin Enterprise 31.16 18/05/2015 18/02/2016 100 Final
116 BDRIDP/BAR/SDR/CCA-Rd/07 Improvement of road from Charkawa Nayani - Shaberhat via Durgapur hat (Barisal Sadar Upazila 7no. Charkawa union 1no.word nurul islam to Bank Jalal Bari Pull) road By HBB from Ch.0.0 - 1000m under Barisal-S Upazila,Barisal District. e-ID : 29367 BDRIDP barishal-s 1.00 24.31 M/S Apu Enterprise 20.63 100 Final
117 BDRIDP/BAR/SDR/CCA-Rd/09 (a) Improvement of road Shibpasha-Sholna Talukder Bari via Malek Police Bari at Ch. 0.00m-1600m (Sholna DC Road-Tulatola-Badantola with link road Tulatola-Ghorami Bari Bridge) (b) Construction of 1.60m×1.60m Box Culvert and U-Type Culvert at Ch. 694m & 13 BDRIDP barishal-s 1.60 125.90 M/S Khondokear Enterprise 108.02 30/06/2016 26/06/2017 100  
118 BDRIDP/BAR/SDR/UN-Rd/02 Improvement of Charkawa Kheyaghat - Durgapur hat road from Ch. 3000m - 3600m.under Sadar Upazila Barisal District. BDRIDP barishal-s 0.60 34.65 M/S Niaz Traders 31.18 60  
119 BDRIDP/BAR/SDR/CCA-RdR/12 Improvement of road Shibpasha - Sholna Talukder bari via H/O Malek Police at ch.1600km - 2020km under Sadar Upazila Barisal. BDRIDP barishal-s 0.42 27.20 M/S Kohinoor Enterprise 24.48 100  
120 BDRIDP/BAR/SDR/CCA-EW/02 Resectioning of road from Charkawa Nayami-Shaheber hat via Durgapur hat (Barisal Sadar Upzila 7no. Charkawa union 1no word nurul islam to Bank Jalal Bari Pull) road from Ch. 0.00m-1000m. BDRIDP barishal-s 1.55 Md. Anowar Hossain Mridha LCS No-1 1.55 16/04/2015 16/05/2015 100  
121 BDRIDP/BAR/SDR/CCA-EW/03 Resectioning of road Shibpasha-Sholna Talukder Bari via Malek Police Bari at Ch. 0.00m-1600m (Sholna DC Road-Tulatola-Badantola with link road Tulatola-Ghorami Bari Bridge). BDRIDP barishal-s 1.60 4.00 Fatema Begum LCS No-1 4.00 29/02/2016 30/04/2016 100  
122 BDRIDP/BAR/SDR/UN-EW/01 Resectioning of Road from Gilatali Kheyaghat-Biswasherhat via Model Madrasha at Ch. 1500m-2700m BDRIDP barishal-s 1.20 4.38 LCS No-1 4.38 100 Final
123 BDRIDP/BAR/SDW/UZ-Ew/01 Resectioning of Shehaber Hat-Singherkati Chandramohon Road at Ch. 729m-1009m BDRIDP barishal-s 0.28 2.55 LCS No-1 2.55 100 Final
124 BDRIDP/BAR/GOR/UZ-ST/01 Construction of 30.00m PSC Girder Bridge on Barti Bazar to Gournadi GC at Ch.5000km over Anandhapur Khal under Gournadi UpazilaDistrict-Barisal BDRIDP gouranadi 506322005 30.00 249.34 M/S Kohinoor Enterprise 271.73 18/03/2018 18/03/2019 75 08/04/2019  
125 BDRIDP/BAR/GOR/UZ-ST/02 Construction of 32.00m PSC Girder Bridge on Barti BazarNHW to Gournadi GC via Torky GC at Ch.9340km over Kashba Khal under Gournadi Upazila District-Barisal BDRIDP gouranadi 506322005 32.00 241.97 M/S Kohinoor Enterprise 263.70 18/03/2018 18/03/2019 65 08/04/2019  
126 BDRIDP/BAR/GOR/UZ-RdR/05 Periodic Maintenance of Batazore-Agarpur-Sarikal via Hosnabad Nalchira-Miarchar road. a Earthwark from Ch. 8725- 17177m.b Carpeting DC 17361.14 sqm.c 12mm SC-13906.56 sqm. Under Gournadi Upazila District - Barishal. BDRIDP gouranadi 506322002 16020946.00 0.00 0 08/04/2019 E-Tender Under Process.
127 BDRIDP/BAR/GOR/UZ-RdR/06 Periodic Maintenance of iIlah Bas stand NHW to Agailjhara H/Q via Bakai & Rajihar Bazar in/c Nutun Bazar Connecting road.a Earthwark from Ch. 0- 3832m.b Carpeting DC 3224.409 sqm.c 12mm SC-11191.1 sqm. Under Gournadi Upazila District - Barishal. BDRIDP gouranadi 506322006 5915176.00 0.00 0 08/04/2019 E-Tender Under Process.
128 BDRIDP/BAR/GOR/UZ-RdR/07 Periodic Maintenance of Batazore GCNHW to Dhamura GC via Solak Bazar road.a Earthwark from Ch. 0- 2145m.b Carpeting 40mm-DC 6403.2 sqm.c Palisading Work297.00m. Under Gournadi Upazila District - Barishal. BDRIDP gouranadi 506322011 8824294.00 0.00 0 08/04/2019 E-Tender Under Process.
129 BDRIDP/BAR/GOR/UN-RdR/05 Periodic Maintenance of Chadshi UP Office-Goila UP Office Road.a Earthwark from Ch. 0- 830m.b Carpeting DC 322.5 sqm.c 12mm SC-2208.35 sqm. Under Gournadi Upazila District - Barishal. BDRIDP gouranadi 506323020 1001243.00 0.00 0 08/04/2019 E-Tender Under Process.
130 BDRIDP/BAR/GOR/CCA-Rd/02 Improvement of road from Gournadi Highway Thana Connecting road under Gournadi Upazila. BDRIDP gouranadi 15.44 M/S Tamim Enterprise 16.12 21/06/2015 20/11/2015 100 Final
131 BDRIDP/BAR /GOU/UN-Rd/01 (a) Improvement of Road from Sarikal GC to Shaheber char Bazar via Nalchira Bazar ch. 5555m-7055m), (b) Construction of 2 nos U-drain at ch.599m & 6555m on the same road Under Gournadi Upazila, District-Barisal. BDRIDP gouranadi 1.50 97.85 M/S Islam Brothers 103.58 23/11/2014 23/05/2015 100 Final
132 BDRIDP/BAR /GOU/UZ-Rd/01 (a) Improvement of Road from Gournadi Bandar GC to Muladi GC via Kutubpur Bazar at ch. 0m-630m), (b) Construction of 2 nos U-drain at ch. 205m & 364m on the same road Under Gournadi Upazila, District-Barisal. BDRIDP gouranadi 0.63 51.23 M/S Islam Brothers 53.99 23/11/2014 23/05/2015 100 Final
133 BDRIDP/BAR /GOU/UZ-Rd/02 Improvement of illah (NHW) to Kalkini Upazila HQ via Tulatala Bazar at ch.2413m-3213m), Under Gournadi Upazila, District-Barisal. BDRIDP gouranadi 0.80 46.43 M/S Sadman Builders 48.99 16/11/2014 15/05/2015 100 Final
134 BDRIDP/BAR /GOU/UN-Rd/02 (a) Improvement of Batazore GC to Pinglakathi Bazar via Pachim Chandrahar GPS at ch. 0m-1000m), (b)Construction of 1 nos U-drain at at ch.14m on the same road, (c) Construction 1v-2.3mx2.30m RCC Box Culvert at ch.527m & 1583m on the same road Under Gourna BDRIDP gouranadi 1.00 78.05 M/S Islam Brothers 82.37 23/11/2014 23/05/2015 100 Final
135 BDRIDP/BAR/GOR/CCA-Rd/01 Improvement of road from Maddam Hosnabad Nabarun RPS to Nezamuddin College by HBB at Ch.481-1492m (Nizamuddin Degree College road from freedom fighter Nizamuddin Shaheber Kaborstan via Madha hosnabad UP Member Md.Matiur Rahman Sarif Bari Bridge under Gour BDRIDP gouranadi 1.01 28.39 Md. Sirazul Islam Hanif 26.01 27/11/2014 27/04/2015 100 Final
136 BDRIDP/BAR/GOR/UZ-Rd/03 Improvement of Barthi Bazar (NHW) to Gournadi GC via Torky GC at ch.2150 - 4150m. BDRIDP gouranadi 2.00 131.46 M/S Santu Traders 138.02 15/07/2015 14/07/2016 100 Final
137 BDRIDP/BAR/GOR/UN-Rd/03 Rehabilitation of road from Mahilara UP Office to Chadshi Hat via Bilogram Bazar (A. Rob Chokder House to Chadshi Hat road) road By BC from Ch. 5370-6900m. BDRIDP gouranadi 1.53 58.34 M/S Santu Traders 61.25 15/07/2015 14/04/2016 100 Final
138 BDRIDP/BAR/GOR/UN-Rd(R)/04 Rehabilitation of road from Mahilara UP office to Chadshi hat via Billogram Bazar road from Ch. 3740-4850m (Salvage Material Cost Tk. 11,01,418.00) BDRIDP gouranadi 1.11 53.59 M/S Santu Traders 56.24 15/07/2015 14/04/2016 100  
139 BDRIDP/BAR/GOR/UN-St/01 Construction of 2-Vent 4.30mx4.30m RCC Box Culvert on Mahilara UP office to Chadshi hat via Billogram Bazar road at Ch. 4200m. BDRIDP gouranadi 19.71 M/S Santu Traders 20.69 15/07/2015 14/12/2015 100 Final
140 BDRIDP/BAR/GOR/CCA-St/01 Construction of 3 Nos Single Vent 4.30mx4.30m RCC Box Culvert & 2 nos U-Drain on Battala Kapali bari Bridge (NHW) to Khanjapur High School road at ch. 95m,270m,1276m564m&970m Under Gournadi Upazila, District-Barisal e-ID : 22284 BDRIDP gouranadi 66.81 M/S Siam Enterprise 69.47 100 Final
141 BDRIDP/BAR/GOR/CCA-Rd/03 Improvement of road from Battala Kapali bari Bridge (NHW) to Khanjapur High School road by BC from Ch.00 - 1656m Under Gournadi Upazila, District-Barisal e-ID : 22285 BDRIDP gouranadi 1.66 70.61 M/S Siam Enterprise 73.43 100 Final
142 BDRIDP/BAR/GOR/UZ-Rd/04 Improvement of Barthi Bazar (NHW) to Burghata bus Stand (NHW) via Amanagong hat at Ch. 450-2450m. e-ID : 19611 BDRIDP gouranadi 2.00 128.75 M/S Howlader Constructure 131.73 100 Final
143 BDRIDP/BAR/GOR/UN-EW/01 Improvement of road from Mahilara UP Office to Chadshi hat via Billogram Bazar road By Earth Filling Work from Ch. 3740m-4850m. BDRIDP gouranadi 1.11 3.50 Anjur Ali Sarder LCS No-1 3.50 15/11/2015 30/03/2016 100  
144 BDRIDP/BAR/GOR/UZ-EW/01 Resectioning of road from Brthi Bazar (NHW) to Burghata Bus Stand (NHW) via Amanothgonj hat at Ch. 450m-2450m by earth. BDRIDP gouranadi 2.00 3.00 Md Mahabub Khan LCS-1 3.00 100  
145     BDRIDP gouranadi 2.10 Md Mohasin Sharder LCS-2 2.10 100  
146 BDRIDP/BAR/HZL/CCA-Rd/01 Improvement of Kowria- Moulavirhat UZR Poschim koralia road under Hizla Upazila District Barisal aEarth work from Ch.0.0 -900m b Dense Carpeting Ch.0.0 -900m c Two vent 4m x 4m RCC Box Culvert at Ch.252m BDRIDP hizla 0.90 0.00 Md. Mahafuz Khan 79.51 35 08/04/2019  
147 BDRIDP/BAR/HZL/CCA-Rd/02 Improvement of Hizla Muladi road to Motiar Dewan Bari via Sergent Dula Bari roadRHD via Surgeant Dulal- Kathal BeganUZR under Hizla Upazila Barisal District.ID No.506364003 Salvaged Cost Tk.2186650.00a Earth work Ch.0.0 - 1500mb Carpetting Ch. 0.0 - 1500m BDRIDP hizla 1.50 100.53 M/S R S Construction 95.51 28/06/2018 28/12/2018 25 08/04/2019  
148 BDRIDP/BAR/HZL/Gha/01 Construction of RCC Boat land Station at Abupur Ghat under Hizla Upazila Barisal BDRIDP hizla 32.55 M/S S H Enterprise 31.47 100 08/04/2019  
149 BDRIDP/BAR/HZL/CCA-Rd/03 Improvement of Khunna Hospital RHD via Kawmi Madrasha - Baherchar UZR Barajalia Board GPS CS Connecting road a Earthwork from Ch.850 -1820m b Carpetting BC from Ch.850 -1820m under Hizla Upazila District Barishal Salvaged Cost TK 2343371.00 BDRIDP hizla 0.97 67.98   0.00 20 08/04/2019  
150 BDRIDP/BAR/HZL/CCA-Rd/04 Improvement of road from Horinathpur Koshaipotti UZR - Zetighat GPS UZR ID No. a Earthwork from Ch.0.0 -1500m b Carpetting BC from Ch.0.0 -1500m under Hizla Upazila District Barishal Salvaged Cost TK 112128.00 BDRIDP hizla 1.50 99.37   0.00 10 08/04/2019  
151 BDRIDP/BAR/HZL/UZ-EW/01 Resectioning of road from Dhanusikder Hat to Muladi Upazila Road at Ch. 0.00m-325m BDRIDP hizla 0.33 2.27 Md. Humaun KabirLCS No-1 2.27 15/11/2015 30/03/2016 100 08/04/2019  
152 BDRIDP/ BAR/HZL/ CCA-Rd/05 Improvement of road from UZR -6 Mohishkhola Madrasha to VRA-15 Uttor Guabaria GPS via house of Abdul Gafur Sarder road by BC From Ch. 00m-1760.00m. Salvage Amount TK 296023.00 Under Hizla Upazila District- Barishal. BDRIDP hizla 506364034 12738507.00 0.00 0 08/04/2019 E-Tender Under Process.
153 BDRIDP/BAR/HZL/CCA-Rd/06 Improvement of Kawria Bazar Danushikder hat road - Noroshingpur road Start Mollah Bari Shop Salvaged Cost Tk.309333.54 i Earth work Ch.0.0 - 760miiCarpeting DC Ch.0.0 - 760m under Hizla Upazila District Barishal. BDRIDP hizla 506365051 1255934.00 0.00 0 08/04/2019 E-Tender Under Process.
154 BDRIDP/BAR/HZL/UZ-St/01 Dhunusikder Hat to Memania Taker Hat road via Abupur Kheyaghat i Construction of Diuble vent 2 x 4.50 x 6.50m RCC Box Culvert at Ch.2600mii Construction of Diuble vent 2 x 4.00 x 5.00m RCC Box Culvert at Ch.3380mUnder Hizla Upazila Barishal District. BDRIDP hizla 506362005 5693472.00 0.00 0 08/04/2019 E-Tender Under Process.
155 BDRIDP/ BAR/HZL/ CCA-Rd/07 Improvement of Purbo Kandi WDB Embt. Salvaged Cost Tk 257546.00i Earthwark Ch.0.00m-900m. ii Carpeting DC Ch.0.00m-900m. iii Palsading 95m.Under Hizla Upazila Barishal District. BDRIDP hizla 506365003 6755327.00 0.00 0 08/04/2019 E-Tender Under Process.
156 BDRIDP/BAR/HZL/UZ-Rd(R)/01 Rehabilitation of road from of Dhanusikder Hat-Muladi Upazila road by BC from Ch. 0.00m-1000m. BDRIDP hizla 1.00 70.95 M/S Oshin Enterprise 56.45 28/05/2015 28/02/2016 100 Final
157 BDRIDP/BAR/MHN/CCA-Rd/02 Improvement of road Purbo Yearbeg (Paloun Bari) - Trimohoni Big Road via Howlader Bari,Jamadder Bari Ebtadi Madrasha from ch.0.00 - 1610m with U-Drain (0.625m x 0.90m) at ch.1051m. BDRIDP mehendiganj 1.61 68.64 M/S Hasan Construction 68.60 19/01/2017 19/09/2017 70 08/04/2019  
158 BDRIDP/BAR/MHN/UZ-Rd/02 Improvement of Ulania GC Aligonj(Hizla) road from Ch.1000-4000m under Mehandigonj Upazila,Barisal. BDRIDP mehendiganj 3.00 105.45 M/S Lutful Kabir 104.93 14/05/2017 14/02/2018 100 08/04/2019  
159 BDRIDP/BAR/MHN/CCA-Rd/03 Improvement of Road from Posshim Yearbeg Dadpur GPS under Mehendiganj Upazila District Barisal ID 506625062aEarthwork Ch.1000 2760m b HBB Ch.1000 -2760m BDRIDP mehendiganj 1.76 59.60 M/S Amir Engineering Corporation 56.62 100 08/04/2019  
160 BDRIDP/BAR/MHN/GC/01 Constructionof Langutia G C (i) Fish Shed (Size : 12m x 6m) (ii) 2 Nos Waste collection Pit (Dustbin) (Size : 1.4m x 1.4m) (iii) Multipurpose Shed (Size : 12m x 6m) (iv) Logistic Support for Langutia Bazar (v) Toilet Block (Size : 5.75m x 3.07m) (vi) 2 No BDRIDP mehendiganj 49.90   0.00 0 08/04/2019 Evaluation on going
161 BDRIDP/BAR/MHN/CCA-EW/01 Resectioning of Purbo Yearbeg (Paloun Bari)-Trimohoni Big Road via Howlader Bari, Jamadder Bari Ebtadi Madrasha at Ch. 0.00m-600m by Earth. BDRIDP mehendiganj 0.60 3.46 Nizam Uddin TalukderLCS No-1 3.46 18/12/2016 18/03/2017 100 08/04/2019  
162 BDRIDP/BAR/MHN/UZ-EW/01 Resectioning of Ulania GC-Aligonj GC (Hizla) Road at Ch. 1000m-1600m BDRIDP mehendiganj 0.60 1.65 LCS No-1 1.65 100 08/04/2019  
163 BDRIDP/BAR/MHN/UZR(R)-Rd/01 Rehabilitation of Patherhat GC - Kazirhat GC Road by BC at Ch.1500 - 2610m Under Mehendigonj Upazila, District-Barisal. BDRIDP mehendiganj 1.11 58.54 M/S Santu Traders 49.73 27/11/2014 27/04/2015 100 Final
164 BDRIDP/BAR/MHN/CCA-Rd/01 Improvement of Mothertoli Bazar - Uttarchar road via Charekkaria road by BC (Ch.2170-3220m, Road Under Mehendigonj Upazila, District-Barisal. BDRIDP mehendiganj 1.05 53.27 M/S Nahid Enterprise 45.15 23/11/2014 23/04/2015 100 Final
165 BDRIDP/BAR/MHN/CCA-St/01 Construction of 1.0 x 1.0m RCC Box culvert at Ch.3042 on Mothertoli Bazar - Uttarchar road via Charekkaria UP road Under Mehendigonj Upazila, District-Barisal. BDRIDP mehendiganj 2.23 M/S Hasib Enterprise 1.85 16/11/2014 15/03/2015 100 Final
166 BDRIDP/BAR/MUL/UZ-St/01 Construction of 4 Nos Box Culvert on Mirdarhat GC-Nazirpur GCCR via Madrasharhat Nomorhat & Bangla Bazar road at Ch. 1020m, 1950m, 2360m & 3435m. BDRIDP muladi 506692004 77.98 M/S Misi Construction 87.72 28/07/2014 27/03/2015 100 08/04/2019 Final
167 BDRIDP/BAR/MUL/UZ-Rd/01 Improvement of road from Mirdarhat GC-Nazirpur GCCR via Madrasharhat Nomorhat & Bangla Bazar road Ch. 0.00-3450m. BDRIDP muladi 3.45 244.06 M/S Lutful Kobir 207.44 20/08/2014 20/05/2015 100 08/04/2019 Final
168 BDRIDP/BAR/MUL/CCA-Rd/01 Rehabilitation of road Raguya Kazirchar R & H - Joynal Master via H/O Sahajahan Dafader (Ch.0.00- 1000.00m. Road under Muladi upazila, Barisal District. BDRIDP muladi 506695135 1.00 41.73 M/S Santu Traders 35.45 27/11/2014 27/04/2015 100 08/04/2019 Final
169 BDRIDP/BAR/MUL/UN-St/02 Construction of 20.00m long RCC Girder Bridge on Boropatherchar GPS at Ch. 0+650km Over Uttar Dakathia khal under Muladi Upazila, Barisal District. BDRIDP muladi 506693005 143.13 PTSL-MOTREE (PVT) LTD 128.81 16/08/2017 15/08/2018 100 08/04/2019  
170 BDRIDP/BAR/MUL/UZ-St/03 Construction of 20.00m long RCC Girder Bridge on Mirdhar hat GC-Nazirpur GC at Ch. 4+500km Over Charkalekhan khal under Muladi Upazila, Barisal District. BDRIDP muladi 506692004 179.24 PTSL-MOTREE (PVT) LTD 161.32 16/08/2017 15/08/2018 100 08/04/2019  
171 BDRIDP/BAR/MUL/UN-St/01 Construction of 21.00m long RCC Girder Bridge on Boropatherchar GPS at Ch.0900km over Uttar Char Dakatia Khal under Muladi Upazila Barisal District. BDRIDP muladi 157.96 M/S Islam Brothers 142.16 95 08/04/2019  
172 BDRIDP/BAR/MUL/UZ-St/02 Construction of 45.00m long RCC Girder Bridge on Mirdhar hat GC-Harinathpur GC - Muladi Border at Ch.3+596km. Over Char Dumuritala khal under Muladi Upazila,Barisal District. BDRIDP muladi 506692002 45.00 244.35 M/S Islam Brothers 219.91 80 08/04/2019  
173 BDRIDP/BAR/MUL/UZ-St/04 Construction of 25.00m long PC Girder Bridge on Mirdhar Hat GC-Nazirpur GC at ch.8380km over Banimardhan khal under Muladi Upazila Barisal. BDRIDP muladi 506692004 25.00 235.04 Orien Trading & Builders 211.53 90 08/04/2019  
174 BDRIDP/BAR/MUL/UZ-St/05 Construction of 30.00m PC Girder Bridge on Mirdhar Hat GC-Nazirpur GC at Ch.7620km over Banimardhan Khal under Muladi UpazilaDistrict-Barisal BDRIDP muladi 506692004 30.00 210.22 M/S Amir Engineering Corporation and M.M Builders & Engineers 189.20 95 08/04/2019  
175 BDRIDP/BAR/MUL/CCA-Rd/07 Improvement of road from Muladi-Mirdar Hat GCCR Kazi Ali Ahmed Bari Grostan Alauddin Dewan Bari under Muladi UpazilaBarisal.a Bituminus Surfacing wearing courseDC 0.0m - 375mb 1 No.1.3m x 1.3m RCC Box Culvert at ch.170m BDRIDP muladi 506695137 0.38 1.30 25.91 M/S Kohinoor Enterprise 23.32 25/01/2018 25/07/2018 25 08/04/2019  
176 BDRIDP/BAR/MUL/UZ-Rd/02 a Improvement of Mirdar Hat GC Bashtala Bazar - Poddar hat- dumuritala -Dhanu Shikder Hat GC Horinathpur Road from Ch.2150m - 4415m under Muladi Upazila Barisal District.b Construction of 1 Nos. 1vent 2.0m x 2.0m RCC box culvert on Mirdar Hat GC Bashtala BDRIDP muladi 506692002 2.27 4.00 171.70 Orien Trading & Builders 154.53 40 08/04/2019  
177 BDRIDP/BAR/MUL/CCA-Rd/09 Improvement of road from Talukder HatKhejurtala Ali Sikder bari by BC Start Pokhi Rostom fokir bari to Nomor hat via Sumsun Nahar Chowdhury Bari at Ch.0.0m -1000m under Muladi Upazila Barisal District.Salvaged Cost Tk 591644.00Improvement of road from Tal BDRIDP muladi 506694016 1.00 58.85 Orien Trading & Builders 52.97 60 08/04/2019  
178 BDRIDP/BAR/MUL/CCA-Rd/08 Improvement of road from Batamara Paderhat Launch Ghat -Salimpur Bazar via Batamara Regd.Primary School via Aminul Haque Kabir Bari by BC at ch.200m - 1252m under Muladi Upazila Barisal. BDRIDP muladi 506695001 1.05 60.00 Md. Mahafuz Khan 54.00 15 08/04/2019  
179 BDRIDP/BAR/MUL/CCA-Rd/10 Improvement of road from Balarmpur Bazar-Dumurtala GPS-Char Dumuritala Bissas Bari Mosque UNRG by BC at Ch. 0.000km-1.000km. under muladi upazila Barisal District BDRIDP muladi 506694094 1.00 57.02 M/S Ferdousi Construction 54.17 10 08/04/2019  
180 BDRIDP/BAR/MUL/CCA-Rd/11 Improvement of road from Muladi-Bara Patarchar Ferry Ghat M by BC at Ch. 3.500km-4.065km. ID No.506694017 under muladi upazila Barisal District BDRIDP muladi 0.57 33.39 M/S AK Buidlers 31.72 14/06/2018 14/11/2018 10 08/04/2019  
181 BDRIDP/BAR/MUL/CCA-Rd/12 Improvement of road from Haraz Sikder Bari to Laxmipur Nutun hat via Rashid Dhali Bari by BC at Ch. 0.900km-2.400km under muladi upazila Barisal District.Salvaged cost Tk.888105.00 BDRIDP muladi 506695010 1.50 91.47 M/S R.S Construction 86.90 15 08/04/2019  
182 LCS Improvement of road by earth work from Mirdarhat GC-Nazirpur GCCR via Madrasharhat, Nomorhat & Bangla Bazar Ch.0-3450m. BDRIDP muladi 506692004 3.45 4.28 LCS No 01 to LCS No-10 4.28 22/05/2014 22/10/2014 100 08/04/2019  
183 BDRIDP/BAR/MUL/CCA-EW/01 Earth work of road Raguya Kazirchar R&H-Joynal Master via H/Q Sahajahan Dafader Ch. 0.00m-1000m under Muladi upazila, Barisal District. BDRIDP muladi 1.00 2.22 Md Fazlu TafaderLCS No-1 2.22 18/11/2014 18/02/2015 100 08/04/2019 Final
184 BDRIDP/BAR/MUL/CCA-EW/02 Earth work of road from Boraiya R&D to Prokas Mondol bari via Boraiya GPS at Ch. 0.00-585m under Muladi upazila, Barisal District. BDRIDP muladi 0.59 2.40 Md Kabir HossainLCS No-1 2.40 18/11/2014 18/02/2015 100 08/04/2019 Final
185 BDRIDP/BAR/MUL/CCA-EW/03 Improvement of road from Bepari Bridge to Char Padma hat via Habib noli at Safipur UP (South Side of Amir Sarif Bridge to Madrasha Bazar via Front of Mojibur Rahaman Noli Bari) road by Earth work from Ch. 00-1250m under Muladi upazila, Barisal District. BDRIDP muladi 1.25 3.23 Fokrul AhosanLCS No-1 3.23 31/05/2015 30/09/2015 50 08/04/2019  
186 BDRIDP/BAR/MUL/CCA-EW/04 Resectioning of road from Char Kalekhan Goni Bari-khalil Bepari bari road by Earth work from Ch. 0.00m-1550m. BDRIDP muladi 1.55 1.01 Md. Mojibor RohmanLCS No-1 1.01 30/08/2015 30/12/2015 100 08/04/2019 Final
187 BDRIDP/BAR/UZP/UN-EW/01 Resectioning of Mirdar Hat GC (Bashtala Bazar)-Poddar hat-Dumuritala-Dhanu Shikder Hat GC (Horinatpur) at Ch. 2150m-2750m. BDRIDP muladi 0.60 2.50 LCS No-1 2.50 80 08/04/2019 Final
188 BDRIDP/BAR/MUL/CCA-Rd/02 Improvement of Road from Boraiya R & HD to Prokas Mondol bari via Boraiya GPS at Ch.0+00km to 0+585km ,Road under Muladi upazila, Barisal District. BDRIDP muladi 0.59 27.63 M/S Santu Traders 23.48 27/11/2014 27/04/2015 100 Final
189 BDRIDP/BAR/MUL/CCA-St/02 Construction of 1 No 4.00m×4.00m (3 Vent) RCC Box Culvert on Madrashar Hat (Start from Char Kalekhan College gate) to Charmalia Beparir Hat Road at ch. 0.00m. BDRIDP muladi 25.44 M/S Lutful Kobir 17.62 25/10/2015 100 Final
190 BDRIDP/BAR/MUL/CCA-St/03 Construction of 2 Nos 4.00m×4.00m (2 Vent) RCC Box Culvert on Kashem Sharder Barir Pool-Kaetmara Kader Mirda Bari road at Ch. 750m & 1402m BDRIDP muladi 51.16 M/S Lutful Kobir 36.83 25/10/2015 100 Final
191 BDRIDP/BAR/MUL/CCA-Rd(R)/04 Rehabilitation of road from Madrashar Hat (Start from Char Kalekhan College gate) to Charmalia Beparir Hat road by BC from Ch. 0.00m-2175m. BDRIDP muladi 2.18 89.69 M/S Topu Enterprise 71.05 18/05/2015 18/10/2016 100 Final
192 BDRIDP/BAR/MUL/CCA-Rd/05 Improvement of road from Kashem Sharder Barir Pool-Kaetmara Kader Mirda Bari road by BC road Ch. 750m-2100m. BDRIDP muladi 1.35 54.50 M/S Topu Enterprise 48.25 18/05/2015 18/10/2016 100 Final
193 BDRIDP/BAR/MUL/CCA-Rd/03 Improvement of road from Bepari Bridge to Char Padma hat via Habib noli at Safipur UP (South Side of Amir Sarif Bridge to Madrasha Bazar via Front of Mojibur Rahaman Noli Bari) road from Ch. 0.00m-1250m. BDRIDP muladi 1.25 33.10 Md Sirazul Islam Hanif 29.47 25/05/2015 25/05/2016 100 Final
194 BDRIDP/BAR/MUL/CCA-St/01 Construction of 1 no 1 Vent 2.00m×2.00m RCC Box Culvert on Bepari Bridge to Char Padma hat via Habib noli at Safipur UP (South Side of Amir Sarif Bridge to Madrasha Bazar via Front of Mojibur Rahaman Noli Bari) road at Ch. 750m BDRIDP muladi 5.06 M/S Sraboni Enterprise 3.69 28/06/2015 27/12/2015 100 Final
195 BDRIDP/BAR/MUL/CCA-Rd/06 Improvement of road from Char Kalekhan Goni Bari-Khalil Bepari Bari road by BC from Ch. 0.00m-1550m. BDRIDP muladi 1.55 89.33 Md. Khair Hossain 70.59 15/10/2015 15/04/2016 100 Final
196 BDRIDP/BAR/MUL/CCA-St/04 Construction of 1 vent 4.00m×4.00m and 1 vent 1.00m×1.00m RCC Box Culvert on Char Kalekhan Goni Bari-Khalil Bepari Bari road at Ch.182m & 330m. BDRIDP muladi 19.37 Md. Khair Hossain 14.63 15/10/2015 15/04/2016 100 Final
197 BDRIDP/BAR/MUL/CCA-St/05 Construction of 12.00m RCC Slab Bridge on Char Pakkia GPS at Ch.0+000km over Char Pakkia Khal. BDRIDP muladi 100.68 M/S Shafi Enterprise 77.28 13/02/2017 13/12/2017 100 Final
198 BDRIDP/BAR/UZP/CCA-St/02 Construction of 1No.0.625m x 0.600m U-Drain & 1No.2 x 4.0m x 4.0m RCC Box Culvert on Goria Natunhat to Fakirbari via Gomostabari Corner, H/O Hazi Makbul Molla, Santu Market ,Nurani Madrasha & H/O Mr.Habibur Rahman road at Ch.650m & 816m. BDRIDP uzirpur 5.00 25.86 Md Zakir Hossain Mia 20.15 30/11/2014 30/05/2015 100 08/04/2019 Final
199 BDRIDP/BAR/UZP/UZ-Rd /02 Improvement of Road from Satla -Chowmuhani (Bisherkandi upto Banaripara Upazila) [Satla GC (Satla H. School) -Razapur Chowmohoni-Bisherkandi GC Road) At Ch.0.0m -2605m under uzirpur Upazila, Barisal. BDRIDP uzirpur 506942007 2.61 183.15 M/S Hasan Construction 142.76 60 08/04/2019  
200 BDRIDP/BAR/UZP/UZ-Rd/03 Improvement of Road from Kalirbazar GC - Barisal Dhaka NHW - Sikerpur R & H Road at Ch.1754 - 4050m under Uzirpur Upazila, Barisal. BDRIDP uzirpur 506942015 2.30 147.54 M/S Hasan Construction 115.01 75 08/04/2019  
201 BDRIDP/BAR/UZP/UZ-RdR/04 Rehabilitation of Harta Chowmuhani Bisherkandi Harta GC - Bisharkandi GC Road at Ch.0.00m - 2600m including 04 Nos 0.625m x 0.600 Drainage CulvertU-Drain at ch.805m 933m 1148m & 1248m under Uzirpur Upazila Barisal District Salvaged Value 4053176.00 BDRIDP uzirpur 506942009 2.60 178.27 M/S S H Enterprise 184.00 15/03/2018 15/03/2019 70 08/04/2019  
202 BDRIDP/BAR/UZP/UN-Rd/01 a Improvement of Uzirpur H/Q-Bamrail UP Office -Gondesor BazarUzirpur UZHQ Girls School-Kholna More-Bamrail R&H from Ch.3400m - 5740m under Banaripara UpazilaBarisal District. b Construction of 2Nos U-Drain on the same road at Ch.4695m & 5090m. BDRIDP uzirpur 506943007 506942018 2.34 150.61 M/S Niaz Traders 135.55 40 08/04/2019  
203 BDRIDP/BAR/UZP/UN-St/01 Construction of 12.00m Long RCC Girder Bridge over Chowdhuri Hat - Hasti Shundi via Daberkul road infront of A. Latif MasterDaberkul Chowmohani - Chowmohini Sere Bangla road at ch. 00.0m under Uzirpur Upazila Barisal District. BDRIDP uzirpur 506943004 12.00 0.00 M.M Builders & Engineers 75.35 100 08/04/2019  
204 BDRIDP/BAR/UZP/CCA-Rd/04 Improvement of Old Sikerpur Bandar-Abul Hasan Mridhas House Connecting road under Uzirpur Upazila Barisal a Earthwork Ch.0.0m - 360m b Bituminous Carpetting Ch.0.0m - 360m c U-Drain 01 no at Ch.117. BDRIDP uzirpur 506945281 0.36 27.39 M/S Kohinoor Enterprise 24.65 29/04/2018 29/08/2018 35 08/04/2019  
205 BDRIDP/BAR/UZP/CCA-Rd/03 Improvement of road from Guthia kakradhari Connecting road North side of Khaleque Mollas House of Dahorpara GPS via Mojid Masters House under Uzirpur Upazila Barisal a Earthwork Ch.0.0m -1550m b Bituminous Carpetting Ch.0.0m - 1550m c U-Drain 04 nos at Ch BDRIDP uzirpur 506944084 1.55 120.43 Md. Mahafuz Khan 108.39 65 08/04/2019  
206 BDRIDP/BAR/UZP/Gha/01 Construction of Typical Ghat at Satla Bazar under Uzirpur Upazila Barisal . BDRIDP uzirpur 25.65 M/S S H Enterprise 24.61 40 08/04/2019  
207 BDRIDP/BAR/UZP/UZ-EW/01 Resectioning of road from Dhamura-Sholok Batajore (Upto Gouranadi Upazila Border) Road from Ch. 0.00m-700m. BDRIDP uzirpur 506942005 0.70 2.59 Yasin SarderLCS No-1 2.59 15/02/2016 30/04/2016 100 08/04/2019 Final
208 BDRIDP/BAR/UZP/UZ-EW/02 Resectioning of Road from Satla-Chowmuhani (Bisherkandi upto Banaripara Upazila) {Satla GC (Satla H. School)-Razapur Chowmohoni-Bisherkandi GC Road} at Ch. 0.00m-1100m. BDRIDP uzirpur 506942007 1.10 4.19 Md. Shahidul IslamLCS No-1 4.19 30/04/2017 80 08/04/2019  
209 BDRIDP/BAR/UZP/UZ-EW/03 Resectioning of Road from Kalirbazar GC-Barisal Dhaka NHW-Sikerpur R&H Road Ch. 1754m-2850m. BDRIDP uzirpur 506942015 1.10 4.22 Kamrun NesaLCS No-1 4.22 18/12/2016 18/03/2017 75 08/04/2019  
210 BDRIDP/BAR/UZP/UN-EW/01 Resectioning of Uzirpur H/Q Bamril UP Office-Gondesor Bazar (Uzirpur UZHQ Girls School-Kholna More-Bamril R&H) From Ch. 3400m-3900m By Earth. BDRIDP uzirpur 506943007 506942018 0.50 4.35 Md. Ziaul HaqueLCS No-1 4.35 31/05/2017 31/10/2017 100 08/04/2019 Final
211 BDRIDP/BAR/UZP/UZ-EW/04 Resectioning of Harta Chowmuhani (Bisherkandi) {Harta GC-Bisherkandi GC} Road at Ch. 0.00m-1000m BDRIDP uzirpur 506942009 1.00 5.13 Shilpi BiswasLCS No-1 5.13 30/10/2017 30/03/2018 80 08/04/2019  
212 BDRIDP/BAR/UZP/CCA-Rd/05 Part A Improvement of road from Muktijodda Milon Kendra Connecting road Harasia road.i Carpeting DC Ch. 0.00m-900m. ii 3 Nos.0.625mx0.600m U-Drain at Ch.10m365m665m.Part B Improvement of road from East Joysree Village road.i Carpeting DC Ch. 0.00m-1000m.ii 2 Nos.0.625mx0.600m U-Drain at Ch.605m865m. Salvaged Cost Tk 141267.00Part C Improvement of road from Jugihati-Chokder bari Jame Mosque to Damodarkathi Tri mukhi Atok road by DC at Ch.0.00m-1050.00m with 1 No.4.30mx4.30m RCC Box Culvert at Ch.560m. 3 Nos.0.625mx0.600m U-Drain at Ch.130m760m & 835m. Under Uzirpur Upazila Barishal District. BDRIDP uzirpur 506945170 506945028 506945172 2.50 6.00 23428700.00 0.00 0 08/04/2019 Tender Processing
213 BDRIDP/BAR/UZ/CCA-St/01 Construction of 15.00m RCC Girder Bridge at Ch. 1600m on Daberkul-Dhamura Road over the Thandar Khal infornt of Wazed Ali Sikder GPS. BDRIDP uzirpur 15.00 0 65.44 M/S Safi Enterprise 55.68 11/06/2014 18/06/2014 17/06/2015 100 0.00 0 15/04/2015 Final
214 BDRIDP/BAR/UZP/CCA-Rd/01 Improvement of road from Goria Natunhat to Fakirbari via Gomostabari Corner, H/O Hazi Makbul Molla, Santu Market, Nurani Madrasha & H/O Mr.Habibur Rahman (Beer Protik) by BC from Ch.0.00-1500m under Uzirpur Upazila, Barisal. BDRIDP uzirpur 1.50 63.78 Md Sirazul Islam Hanif 51.68 100 Final
215 BDRIDP/BAR/UZP/CCA-Rd/02 Improvement of road from Paschim Satla WAPDA to Satla Kheyaghat via H/O Fazlul Hoque Hawlader & Mosque By HBB from Ch. 0.00-375m. BDRIDP uzirpur 0.38 13.16 M/S Lutful Kabir 12.26 100 Final
216 BDRIDP/BAR/UZP/CCA-St/03 Construction of 2 Nos 1 Vent 2.00×2.00m RCC Box Culvert on the Khal on the road from Mosang Bazar South side of river towards the west (Mosang Khal GCCR to Mosang Jamey Mosque road) at Ch 10m & 400m. BDRIDP uzirpur 33.97 Md Zakir Hossain Mia 26.83 18/05/2015 18/10/2015 100 Final
217 BDRIDP/BAR/UZP/UZ-Rd(R)/01 Rehabilitation of road from Dhamura-Sholok Batajore (Upto Gouranadi Upazila Border) road from Ch. 0.00m-2100m. BDRIDP uzirpur 2.10 102.15 M/S G M Construction 85.23 100 Final
218 CIB-Bar-W-132 Construction of 24.00 m RCC Girder Bridge on Sharikol Bondor Khal of Tiler Char Pacca Bridge to Suren Sikder Hat Road at Ch.2100 m Under Babugong Upazila, Dist. Barishal [Road ID: 506034040]. CIB-Bar-W-132 CIBRR babuganj 506034040 24.00 65 257.33 M/S. Amir Engineering Corporation. 231.59 14/11/2022 21/11/2022 05/05/2024 98 150.50 65 05/02/2025 Work is on going
219 CIB-Bar-W-82 "Construction of 619.00m Long Arch & RCC Girder Bridge Over Purbo Char Kutubpur Arial kha River on Gournadi Bandar GC to Muladi via Kutubpur Road at Ch.630m Under Gournadi Upazila, Dist. Barishal [Road ID: 506322016]. CIB-Bar-W-82" CIBRR gouranadi 506322016 619.00 16 8066.86 Nabarun Traders Ltd. 9135.81 15/06/2023 22/06/2023 21/06/2026 19 1442.00 16 05/02/2025 Work is on going
220 CIB-Bar-W-23 Const. of 440m long PSC Girder Bridge over Kodomtola (Naya Bhagoni) river on Shaestabad GC (Brisal Sadar) Hizla Upazila HQ via Gazirhat, Kazirhat GC, Miachat and Ekkotarhat at Ch. 00.00m under Mehendiganj Upazila, Dist. Barishal CIBRR mehendiganj 506622008 440.00 100 3901.17 MD.MAHAFUZ KHAN-PROJECT BUILDERS LIMITED(JV) 3700.00 09/08/2018 16/08/2018 04/10/2022 100 3677.69 100 05/02/2025 Final Bill Not Paid
221 CIB-Bar-W-131 "Construction of 280.00m Long Arch & RCC Girder Bridge Over Jyanti Branch river near Talukderhat Bazar ( Khejurtala Bazar) on Muladi-Barapatachar Ferry Ghat Road at Ch.5900m Under Muladi Upazila, Dist. Barishal" CIBRR muladi 506694017 280.00 36 4146.37 Md.Mahfug Khan Ltd,Prop: Md.Mahfug Khan. 3858.46 13/06/2023 20/06/2023 20/06/2026 43 1393.70 36 05/02/2025 Work is on going
222 CRMIDP/BAR/W-193 Jamvita Hat CRMIDP banaripara 38 360.00 "M/S. Amir Engineering Corporation College Row, Barishal. " 313.10 27/06/2022 17/07/2022 50 118.00 38 27/07/2022
223 CRMIDP/BAR/W-196 Badamtoli Bazar CRMIDP mehendiganj 54 231.00 M/S Layla Builders 196.35 26/06/2022 05/06/2021 70 107.00 54 26/07/2022
224 CRMIDP/BAR/W-198 Shikarpur Hat & Bazar CRMIDP uzirpur 252.00 M/S Rupali Construction & Shad Enterprise(JV) 206.40 15/10/2020 15/10/2020 25 26/07/2022
225 GSIDP/BRS/DW-1 Improvement of Kathira Sree Sree Radha Gobindo Mondir, Union: Under Goila.[Latitude:22.94826, Longitude: 90.13975.] GSIDP agailjhara 5.00 M/S. Sharif Enterprise 5.25 21/06/2018 0  
226 GSIDP/BRS/DW-2 Improvement of RamanandarAk High School kali Mondir, Union: Rajihar.[Latitude:23.00438, Longitude: 90.14028.] GSIDP agailjhara 5.00 M/S. Yamin Traders 5.25 21/06/2018 21/09/2018 0  
227 GSIDP/BRS/DW-3 Improvement of Uttar Somayerpar kali Mondir, Union: Bagda.[Latitude:22.96699, Longitude: 90.09489.] GSIDP agailjhara 5.00 M/S. Sharif Enterprise 5.25 21/06/2018 21/09/2018 100  
228 GSIDP/BRS/DW-4 Improvement of Oichar math Radha Gobindo Mondir, Union: Goila.[Latitude:22.9383, Longitude: 90.16049.] GSIDP agailjhara 5.00 M/S. Sharif Enterprise 5.25 21/06/2018 21/09/2018 0  
229 GSIDP/BRS/DW-5 Improvement of East Bakal Gobindo Mondir, Union: Bakal.[Latitude:22.98346, Longitude: 90.146.] GSIDP agailjhara 5.00 M/S. Yamin Traders 5.25 21/06/2018 21/09/2018 0  
230 GSIDP/BRS/DW-6 Improvement of Vajna Jamay Mosque, Union: Rajihar.[Latitude:23.03356, Longitude: 90.15457.] GSIDP agailjhara 5.00 M/S. Yamin Traders 5.25 21/06/2018 21/09/2018 0  
231 GSIDP/BRS/DW-7 Improvement of Sorbari Sorbojonin Durga Mondir, Union: Bakal.[Latitude:22.96423, Longitude: 90.11635.] GSIDP agailjhara 5.00 M/S. Yamin Traders 5.25 21/06/2018 21/09/2018 100  
232 GSIDP/BRS/DW-128 Improvement of Baltun Noor Jame Mosjid , Union: Sayedkati , Latitude: 22.8425, Longitude:90.1349 . GSIDP banaripara 3.00 M/S. Khan Store 2.85 10/02/2019 17/05/2019 100 08/04/2019
233 GSIDP/BRS/DW-112 Improvement of Brammonkathi Nesaria Sador Jame Mosjid , Union: Banaripara , Latitude: 22.7722, Longitude: 90.1379 GSIDP banaripara 3.00 M/S. Laily Enterprise 2.85 0 08/04/2019
234 GSIDP/BRS/DW-113 Improvement of Darbesh Meseria Jame Mosjid , Union: Banaripara , Latitude:22.7636 , Longitude: 90.1559. GSIDP banaripara 3.00 kathalia Builders 2.85 0 08/04/2019
235 GSIDP/BRS/DW-114 Improvement of Kajlaher Sharbojonin durga Mondir , Union: Banaripara , Latitude: 22.7702, Longitude: 90.1265. GSIDP banaripara 3.00 M/S. Mothers Construction 2.85 0 08/04/2019
236 GSIDP/BRS/DW-115 Improvement of Banaripara College Field , Union: Banaripara , Latitude: 22.7821 , Longitude: 90.1558. GSIDP banaripara 3.00 M/S. Ma enterprise 2.85 0 08/04/2019
237 GSIDP/BRS/DW-116 Improvement of Dakhin Najirpur High School Field under Dakhin Najirpur union [Latitude: 22.7801, Longitude: 90.1540] GSIDP banaripara 3.00 M/S. Kazi Holding 2.85 0 08/04/2019
238 GSIDP/BRS/DW-117 Improvement of Banaripara Muslim Graveyeard Jame Mosjid , Union: Banaripara , Latitude: 22.7883, Longitude:90.1560 . GSIDP banaripara 3.00 M/S. Ma enterprise 2.85 0 08/04/2019
239 GSIDP/BRS/DW-118 Improvement of Banaripara Central Sarbojania Durga Mondir, Union: Banaripara , Latitude: 12.7850, Longitude: 90.158. GSIDP banaripara 4.00 M/S. Laily Enterprise 3.80 0 08/04/2019
240 GSIDP/BRS/DW-119 Improvement of Kachua Gharami Bari Jame Mosjid , Union: Baisari , Latitude: 22.7984, Longitude: 90.1333. GSIDP banaripara 3.00 M/S. Khan Store 2.85 0 08/04/2019
241 GSIDP/BRS/DW-120 Improvement of Baisary Bozlul Hoque Collage Field , Union: Baisary , Latitude: 22.7987, Longitude:90.1224 . GSIDP banaripara 3.00 M/S. Khan Store 2.85 10/02/2019 17/05/2019 10 08/04/2019
242 GSIDP/BRS/DW-121 Improvement of Narottompur Baitunnur Jame Mosjid , Union: Saliabakpur , Latitude: 22.7791, Longitude: 90.1698. GSIDP banaripara 4.00 M/S. Meem Emterprise 3.80 17/01/2019 24/04/2019 0 08/04/2019
243 GSIDP/BRS/DW-122 Improvement of Maddho Morichbunia Edgha , Union: Bisarkandi , Latitude:22.8352 , Longitude: 90.0525. GSIDP banaripara 3.00 M/S. Khan Store 2.85 10/02/2019 17/05/2019 10 08/04/2019
244 GSIDP/BRS/DW-123 Improvement of Moluhar Poboner Hat Shahe Jame Mosjid , Union: Iluhar , Latitude:22.8001 , Longitude: 90.0700. GSIDP banaripara 3.00 M/S. Laily Enterprise 2.85 0 08/04/2019
245 GSIDP/BRS/DW-124 Improvement of Jame Mosjid Near Moluhar High School , Union: Iluhar , Latitude: 22.8068 , Longitude: 90.0585. GSIDP banaripara 3.00 M/S. Twice a Construction 2.85 0 08/04/2019
246 GSIDP/BRS/DW-125 Improvement of Udaykati Bottola Jame Mosjid , Union: Banaripara , Latitude:22.7986 , Longitude: 90.1247. GSIDP banaripara 3.00 M/S. Khan Store 2.85 10/02/2019 17/05/2019 10 08/04/2019
247 GSIDP/BRS/DW-126 Improvement of Tetla Central Sarbojanin Durga Mondir , Union: Udaykati , Latitude: 22.8171, Longitude: 90.1077. GSIDP banaripara 3.00 M/S. Nusrat Traders, 2.85 07/02/2019 14/05/2019 10 08/04/2019
248 GSIDP/BRS/DW-127 Improvement of Lobonsara Eidga , Union Udaykati, Latitude: 22.8014 , Longitude: 90.1233. GSIDP banaripara 3.00 M/S. Nusrat Traders, 2.85 07/02/2019 14/05/2019 10 08/04/2019
249 GSIDP/BRS/DW-129 Improvement of Chakhar Kalir Bazar Sarbojanin Durga Mondir , Union: Udaykati, Latitude: 22.8150, Longitude: 90.1762. GSIDP banaripara 3.00 M/S. Kazi Holding 2.85 0 08/04/2019
250 GSIDP/BRS/DW-130 Improvement of Jame Mosjid at Chakhar Bazar, Union: Chakhar , Latitude: 22.8069 , Longitude: 90.1924. GSIDP banaripara 4.00 M/S. Twice a Construction 3.80 24/01/2019 01/05/2019 10 08/04/2019
251 GSIDP/BRS/DW-131 Improvement of Kachua Shalia jame Mosjid , Union : Baisari , Latitude: 22.7969, Longitude: 90.1392. GSIDP banaripara 3.00 kathalia Builders 2.85 0 08/04/2019
252 GSIDP/BRS/SDW-155 Improvement of Billogram jamey-E-Mosque ,Union : Mahilara .[ Latitude: 22.9459,Longitude: 90.2085] GSIDP gouranadi 3.00 0.00 0 08/04/2019
253 GSIDP/BRS/SDW-164 Improvement of Poschim Hosnabad Jamey-E-Mosque,Union: Sorikal.[ Latitude: 22.925757,Longitude: 90.31471.] GSIDP gouranadi 3.00 0.00 0 08/04/2019
254 GSIDP/BRS/DW-8 Improvement of Gournadi Government College Mosque, Union: Gournadi Pourashava. [Latitude:22.973337, Longitude: 90.221418.] GSIDP gouranadi 5.00 M/S Talukder Enterprise 5.25 14/06/2018 14/09/2018 50  
255 GSIDP/BRS/DW-9 Improvement of Uttar Nathoi Mohammadia Jam-E-Mosque, Union: Gournadi Pourashava [Latitude:23.46339, Longitude: 90.415936.] GSIDP gouranadi 5.00 M/S Talukder Enterprise 5.25 14/06/2018 14/09/2018 50  
256 GSIDP/BRS/DW-10 Improvement of Matubberbari Jam-E-Mosque, Union: Gournadi Pourashava.[ Latitude:22.961328, Longitude: 90.238885.] GSIDP gouranadi 10.00 M/S Talukder Enterprise 10.50 14/06/2018 14/09/2018 10  
257 GSIDP/BRS/DW-11 Improvement of Dakkhin Palordi Shasan, Union: Gournadi Pourashava. [Latitude :23.075097, Longitude: 90.163662.] GSIDP gouranadi 5.00 M/S Talukder Enterprise 5.25 14/06/2018 14/09/2018 100  
258 GSIDP/BRS/DW-12 Improvement of Bangila Mosque, Union: Barthi.[Latitude:23.074401, Longitude:90.163094.] GSIDP gouranadi 5.00 M/S Talukder Enterprise 5.25 14/06/2018 14/09/2018 90  
259 GSIDP/BRS/DW-13 Improvement of Dakkhin Kashemabad Mosque, Union: Gournadi Pourashava. [Latitude:22.941808, Longitude: 90.233536.] GSIDP gouranadi 5.00 M/S Talukder Enterprise 5.25 14/06/2018 14/09/2018 100  
260 GSIDP/BRS/DW-14 Improvement of Jangalputty Gomosta Para Jam-E-Mosque, Union:Mahilara. [Latitude:22.954000, Longitude: 90.217169.] GSIDP gouranadi 3.00   0.00 14/06/2018 14/09/2018 100  
261 GSIDP/BRS/DW-15 Improvement of Showara Village in front of Captain Harolal Gangoli ShibMondir, Union:Gournadi. [Latitude:22.961328, Longitude: 90.238885.] GSIDP gouranadi 3.00   0.00 14/06/2018 14/09/2018 100  
262 GSIDP/BRS/SDW-156 Improvement of Bhamura Bazar Sarbojonin Horee Durga Mondir,Union : Solok .[ Latitude: 22.891529,Longitude: 90.1978644.] GSIDP uzirpur 3.00 0.00 0 08/04/2019
263 IBRP/Bari/Gour/main/Brg-07 Maintenance of 22.00m Long Iron Bridge on Tarakupi Fakir bari NHW to Madra GPS Road at Ch.650m IBRP gouranadi 506324046 22.00 99 14.28 M/S Kohinoor Enterprise 15.00 06/05/2019 20/05/2019 13/09/2019 100 14.88 99 15/07/2020
264 Package No: IBRP/Bari/Gour/main/Brg-07 Maintenance of 22.00m Long Iron Bridge on Tarakupi Fakir bari NHW to Madra GPS Road at Ch.650m IBRP gouranadi 506324046 22.00 55 352.04 M/S Amin Engineer 307.33 11/04/2019 25/04/2019 20/04/2020 60 168.00 55 14/07/2020
265 IBRP/Bari/Hiz/Rehab/Brg-05 Rehabilitation of 15m Long Iron Bridge on Chaygown Bazar - Gangapur GPS Road near the H/O Md. Nurul Islam Palowan at Ch.4380m IBRP hizla 506365034 15.00 100 19.15 M/S Akon Enterprise 18.19 30/04/2019 14/05/2019 07/10/2020 100 18.19 100 15/07/2020
266 IBRP/Bari/Hiz/main/Brg-06 Rehabilitation of 25m Long Iron Bridge on Chaygown Bazar - Gangapur GPS Road Near the H/O Md. Mannan Bepari at Ch.5500m IBRP hizla 506365034 25.00 100 31.69 Kathalia Builders 30.11 25/04/2019 09/05/2019 02/11/2019 100 30.11 100 15/07/2020
267 IBRP/Bari/Hiz/Rehab/Brg-03 Rehabilitation of 25m Long Iron Bridge on Hizla Gourabdi UP office via Ekota Bazar - Sankorpasha Bazar Road near the H/O Jahangir Bagha at Ch.3850m IBRP hizla 506363001 25.00 100 35.47 M/S Tuhuria & Rafi Enterprise 33.70 07/05/2019 22/05/2020 13/11/2019 100 33.65 100 14/07/2020
268 IBRP/Bari/Hiz/Rehab/Brg-04 Maintenance of 26m Long Iron Bridge on Hizla Gourabdi UP office via Ekota Bazar-Sankorpasha Bazar Road near the H/O Khalil Maji at Ch.4150m IBRP hizla 506363001 26.00 100 9.03 M/S SAGAR ENTERPRISE, 8.58 25/04/2019 09/05/2020 02/09/2019 100 8.58 100 14/07/2020
269 IBRP/Bari/ Uzir/Brg-02 Construction of 44.0m Long RCC Girder Bridge on Dhamura - Satla Road IBRP uzirpur 506942004 44.00 0 352.04 M/S Amir Engineering 307.33 17/03/2019 28/03/2019 15/10/2020 2 0.00 0 02/04/2019 work ongoing
270 IRIDP-2/BRS/DW-183 Construction of 16.00m Bridge on Sabikhar par Needs office-Nagarbari GPS-Paschim Sujankati Narayan Boiragir's house over Agailjhara Poiserhat khal at ch.1450m. ID NO 506025070 M/S IRIDP-2 agailjhara 506025070 121.89 Mother Engineering 124.32 04/04/2018 11/04/2019 40 02/04/2019
271 IRIDP-2/BRS/DW-184 Construction of 16.00m Bridge on Muktijodda Complex-Upazila H.Q via livestock office Road.at ch.12.0m ID NO 506025225 IRIDP-2 agailjhara 506025225 118.28 M/S Mother Engineering 120.84 04/04/2018 11/03/2019 50 02/04/2019
272 IRIDP-2/BRS/DW-57 Improvement of Choddyamada Changutia Shihipasharoad,( Ch. 00m - 4567m) (b) Construction of 01 no 3.00mx3.0m culvert at ch.2421m on the same road. (c) Construction of 01 no 2x4.50mx4.50m culvert at ch.3120m on the same road. IRIDP-2 agailjhara 506024005 4.57 264.18 MSE-MYT (JV) 277.27 26/05/2016 10/03/2018 100 31/03/2019
273 IRIDP-2/BRS/DW-76 Improvement Of Goila Guptar hat Road N/S - Uttar Shehepasha road ( Revinew office – goilabazar road).(Ch.00m - 1100m) IRIDP-2 agailjhara 506024027 1.10 56.92 M/S. Sharif Enterprise 59.66 20/03/2017 30/05/2018 100 31/03/2019
274 IRIDP-2/BRS/DW-77 Improvement Of Rajihar Post office - Bosubari.road .(Ch.00m - 300m) IRIDP-2 agailjhara 506025083 0.30 17.16 M/S. Yamin Traders 17.99 20/03/2017 28/02/2018 100 31/03/2019
275 IRIDP-2/BRS/MW-144 Maintenance of Bagdha GC - Shatla GC via Khajuria road (Ch.500m - 2600m) ID NO 506022009 IRIDP-2 agailjhara 506022009 2.10 59.64 M/S. Shafique Brothers 62.59 15/10/2017 30/11/2018 100 31/03/2019
276 IRIDP-2/BRS/DW-4 a) Improvement of Road from Guptar hat- Jobsen Sehepasha High School road,( Ch. 1650-3500m) b) Improvement of Road from Nuremodina Mosque {Amjad Sarder's bari}-Jobsen GPS road, (Ch. 255-960m) (Guptar hat Jobsen via Uttar Shehepasha High School) IRIDP-2 agailjhara 1.85 120.86 M/S. Sharif Enterprise 126.81 11/02/2016 10/11/2016 100  
277 IRIDP-2/BRS/DW-5 Improvement of Road from Bagdha GC Amboula Paishar hat GC.00-2220m) IRIDP-2 agailjhara 2.22 153.85 M/S. Sharif Enterprise 161.44 07/02/2016 06/11/2016 100  
278 IRIDP-2/BRS/DW-90 (a)Improvement of Darogerhat - Musuria senior Madrasha via Musuria Abason Project road (Ch.00m - 4450m)(b) Construction of 02no 2.0mx2.0m culvert at ch.512m & 2025m on the same road.(c)Construction of 02no 1.0mx1.0m culvert at ch.2138m &2755m on the same road. IRIDP-2 babuganj 506034047 4.45 68.53 M/S. Talukder Enterprise 68.53 10/01/2017 19/02/2019 100 03/04/2019
279 IRIDP-2/BRS/DW-91 Improvement of Lakutia-Babugonj road (Battola) to Maidaner hat via Secratery janab serajuddin house road (ch..00-254m & 1254m-2240m) IRIDP-2 babuganj 506034064 1.24 70.82 Md. Sirajul Islam Hanif 63.74 02/05/2017 09/12/2017 100 03/04/2019
280 IRIDP-2/BRS/DW-92 Construction of 01no 3.60mx3.0m culvert at ch.1320m on Baherchar bazar – baherchar hospital link road infront of uttar baherchar Goni master's house (Baherchar bazar – baherchar hospital) IRIDP-2 babuganj 506034027 10.96 M/S. Md. Shamsul Alam 8.29 25/01/2017 30/05/2017 100 03/04/2019
281 IRIDP-2/BRS/DW-93 Improvement of Agorpur UP – Silondia Bazar – Agorur GC road.(Ch.00m - 1830m) IRIDP-2 babuganj 506033011 1.83 102.81 M/S. Faruk Enterprise 94.56 12/01/2017 28/02/2018 100 03/04/2019
282 IRIDP-2/BRS/DW-153 (a)Improvement of Chandpsa Sabuz chairman's house Madrasha - Alfaz master's house via Gazipur Bottola road (Ch.00m - 2650m) ID NO 506034112(b)Construction of 05no 1.0mx1.0m culvert at ch.90m,525m,700m,1350m&1610m on the same road.(c)Construction of 01no 2.0mx2.0m culvert at ch.285m on the same road. IRIDP-2 babuganj 506034112 2.65 106.59 Md. Sirajul Islam Hanif 111.87 05/02/2018 28/12/2018 100 03/04/2019
283 IRIDP-2/BRS/DW-206 Improvement of RHD Agorpur - tangrakhali bridge road (Ch.00m - 800m) ID NO 506034041 IRIDP-2 babuganj 506034041 0.80 50.32 M/S.Ma Babar Doa Traders 47.80 31/07/2018 25/01/2019 100 03/04/2019
284 IRIDP-2/BRS/SDW-220 (a)Improvement of RHD Rafiqul Islam khan house - Pangsha Community clinic road (Ch.00m - 1225m) ID NO 506034150(b)Construction of 01no 0.625mx0.60m culvert at ch.805m on the same road.(c)Improvement of Gazalia club-7 Milles RHD.road (Ch.277m - 447m) ID NO 506034036 IRIDP-2 babuganj 506034036 1.40 93.74 M/S. Nipa Traders 89.05 25/10/2018 02/04/2019 30 03/04/2019
285 IRIDP-2/BRS/DW-222 (a)Improvement of Madhabpasha Gojalia -Mollah Bari - Md.sobhan Mollik(Master)house- East Pangsha GPS.road (Ch.00m - 800m) ID NO 506035104(b)Construction of 02no 1.50mx1.50m culvert at ch.100m,642m on the same road. IRIDP-2 babuganj 506035104 0.80 39.77 Md. Asadur Rahman 37.78 13/02/2019 20/07/2019 20 03/04/2019
286 IRIDP-2/BRS/DW-223 Improvement Madhabpasha Mozomderbari - Gudarha kheyaghat -Hadibashkathi road (Ch.500m - 1500m) ID NO 506034157 IRIDP-2 babuganj 506034157 1.00 39.50 M/S. Sohel Enterprise 37.52 27/02/2019 27/08/2019 20 03/04/2019
287 IRIDP-2/BRS/SDW-227 (a)Improvement Thakur Mallik-Sharikal .road (Ch.00m - 1000m) ID NO 506945017(b)Construction of 01no 3.0mx3.0m culvert at ch.969m on the same road. IRIDP-2 babuganj 506034003 1.00 76.13 M/S. H.R Enterprise 72.32 20/02/2019 27/11/2019 5 03/04/2019
288 IRIDP-2/BRS/RDW-90 Improvement of Darogerhat - Musuria senior Madrasha via Musuria Abason Project road (Ch.00m - 4450m) IRIDP-2 babuganj 506034047 193.84 0.00 0 03/04/2019
289 IRIDP-2/BRS/DW-6 (a) Improvement of road from Maddhy Kudrokathi Govt. Deghi west side (Bottola) to Sangramer Khal via Professar Golam Hossain house (Ch. 00m-1000m (Maddhy Kudrokathi Govt. Deghi west bank Rahamatpur-Mirgonj road attached Vetenary College) (b) Construction IRIDP-2 babuganj 1.00 47.50 Md. Shamsul Alam 35.15 10/03/2016 10/12/2016 100  
290 IRIDP-2/BRS/DW-7 (a)Improvement of road Manikkathi RHD Mobarak Hossain Islamia Academy to Amir Mollik's house (Ch. 00-1000m ) (b) Construction of 01no 1.0mx1.0m culvert at ch.360m on the same road. IRIDP-2 babuganj 1.00 46.21 Md. Shamsul Alam 34.42 10/03/2016 10/12/2016 100  
291 IRIDP-2/BRS/DW-8 (a) Improvement of road from Khodaboxsha Baherchar Adersho High School's from Pucca road to Suzon Ahamad's house by BC (Ch. 00-355m & Ch. 355-500m) (b) Construction of 01no 1.0mx1.0m culvert at ch.5m on the same road. IRIDP-2 babuganj 0.36 21.41 M/S. Nazrul Enterprise 16.94 14/03/2016 13/08/2016 100  
292 IRIDP-2/BRS/DW-9 (a) Improvement of road from Agorpur UP Office-House of Char Uttar Sabuj via Post Office Culvert, Aziz Master's house (Start Steel Bridge from Ch. 3682m Agorpur-Silondia road towards back ie. Chairman hat)(Thakur Mollik Kabirajbari-Post Office north side IRIDP-2 babuganj 1.87 53.97 M/S. Atique Construction 46.37 21/02/2016 19/08/2016 100  
293 IRIDP-2/BRS/DW-132 Improvement of Parshibpur-katakhali road (Ch.500m - 1220m) ID NO 506075220 IRIDP-2 bakerganj 506075220 0.72 38.94 M/S Oshin Enterprise 35.05 17/09/2017 30/09/2018 100 09/04/2019
294 IRIDP-2/BRS/DW-133 Improvement of North Side of Darial Mia Bari to Bangla Bajar foot Bridge Via Char Darial Govt. Pry. School.road (Ch.1425m - 2750m) ID NO 506074033 IRIDP-2 bakerganj 506074033 1.33 44.96 Md. Khair Hossain 42.19 18/09/2017 24/04/2018 100 09/04/2019
295 IRIDP-2/BRS/DW-134 (a)Improvement of East Krishnonagar khondaker Bari RCC Foot Bridge (UZR) to Bothra Hat via Biharipur Mad rasa Road (Ch.00m - 1018m) ID NO 506074084(b)Construction of 01no 1.6mx1.6 m culvert at ch.793 on the same road. IRIDP-2 bakerganj 506074084 1.02 35.86 M/s. Lutfur Kabir 34.21 12/09/2017 30/05/2018 100 09/04/2019
296 IRIDP-2/BRS/DW-135 Improvement of Holta UP Office (Bajar Bridge) to DKP Hat(Balykati Kalitara GPS) via Makimabad Bajar, Dhanshiri Baro Sikder Bari, & Balaikati govt. pry. Schoolroad (Ch.4625m - 5250m) ID NO 506073035 IRIDP-2 bakerganj 506073035 0.63 30.24 M/S Amir Engineering corporation 27.22 20/09/2017 19/04/2018 100 09/04/2019
297 IRIDP-2/BRS/DW-136 Improvement of North Side Nilganj Khaya Ghat to Char Goma Govt. Pry. School via Faruk Moller Bari (River Side Road)..road (Ch.00m - 1576m) ID NO 506074209 IRIDP-2 bakerganj 506074209 1.58 54.83 M/S. Apu Enterprise 50.99 13/12/2017 10/05/2018 100 09/04/2019
298 IRIDP-2/BRS/DW-137 Improvement of Krishnokati Jugi Bari Culvcert to Krishnokati High shool via Krishnokati Govt Pry. School,& Nijamkali Khal Foot Bridge.road (Ch.550m - 1480m) ID NO 506074128b)Construction of 01no 3.0mx3.0m culvert at ch.950m on the same road.c)Construction of 01no 1.60mx1.60m culvert at ch.790m on the same road. IRIDP-2 bakerganj 506074128 0.93 53.96 Md. Mahafuz Khan 48.56 13/12/2017 24/10/2018 100 09/04/2019
299 IRIDP-2/BRS/MW-138 Maintenance of C&B road - Kaloskati Khayaghat via Munir Bari. (Bharpasa UP Office (Atakati Vangar pool) RHD via Jaynal Member Bari,Jabatunnasa Govt. Pry. School to Samitty Ghar) road (Ch.2300m - 4350m) ID NO 506073033 IRIDP-2 bakerganj 506073033 2.05 52.88 Md. Mahafuz Khan 47.59 13/09/2017 18/12/2018 100 09/04/2019
300 IRIDP-2/BRS/DW-188 (a)Improvement of Jerail Lunch Ghat - Bhatshala Lunch Ghat via Vosmahal Govt Pry. School road (Ch.657m - 1277m) ID NO 506074107(b)Construction of 01no 0.90mx0.90m culvert at ch.867m on the same road. IRIDP-2 bakerganj 506074107 0.62 25.15 M/S. Ferdousi Construction 23.89 19/07/2018 30/12/2018 100 09/04/2019
301 IRIDP-2/BRS/DW-189 Improvement of N/ Side of Kamarkhali GC(Darial Dafader Bari) - Nababer Hat via Bishwas Bari road (Ch.00m - 780m) ID NO 506074202 IRIDP-2 bakerganj 506074202 0.78 29.98 MS. Haque Traders 28.48 18/07/2018 30/11/2018 100 09/04/2019
302 IRIDP-2/BRS/DW-193 Improvement of E / Side of Gholder Bari (RHD) Sakander Ali Howlader Bari - Charer Bari Via Montaj Mamber Bari road (Ch.150m - 650m) ID NO 506075314 IRIDP-2 bakerganj 506075314 0.50 20.37 M/S Mother Engineering 19.35 17/07/2018 08/01/2019 100 09/04/2019
303 IRIDP-2/BRS/DW-198 Improvement of Dhudhal madrasha - satraj bazar road (Ch.240m - 1500m) ID NO 506075331 IRIDP-2 bakerganj 506075331 1.26 48.05 M/S. Sadia Enterprise 45.64 26/07/2018 29/10/2018 100 09/04/2019
304 IRIDP-2/BRS/DW-201 Improvement of Katadia Bus Stand - kanaipura Bajar via katadia Govt. Pry. School road(Ch.450m - 1120m) ID NO 506074134 IRIDP-2 bakerganj 506074134 0.67 37.07 M/S. Sikder Arian Enterprise 35.22 30/07/2018 03/01/2019 100 09/04/2019
305 IRIDP-2/BRS/DW-32 Improvement of road from Char Darial Ferry Ghat Pucca Road to Char Darial Kheyaghat Bridge via Moti Mastarer Bari, Kamarkhali Bazar Motahar Mastarer Bari (Kamarkhali GC to Chandramohon GC via Nahalgonj Khayghat (Shingerkati {Barisal Sadar} to Kamarkhali Bazar Road {Bakergonj Upazila} at Ch. 3130m-3940m. IRIDP-2 bakerganj 506072013 0.81 42.15 M/S. Farid Uddin 31.55 28/04/2016 19/11/2016 100 09/04/2019
306 IRIDP-2/BRS/DW-104 (a)Improvement of Let.Abdul barek Sikdarbarir Infront GPS to faridpur bandar via jahngir sikdar Bari. (Mongolshi H/O Sorab Ali Khan via Faridpur Hat. to Howlader Bari (UJR) Near Janata bazar) road.(Ch.3900m - 4900m)(b)Construction of 01no 0.625mx0.90m culvert at ch.4540m on the same road. IRIDP-2 bakerganj 506074122 1.00 31.40 M/S. Hasan Construction 29.20 20/04/2017 30/11/2018 100 09/04/2019
307 IRIDP-2/BRS/DW-196 Improvement of East side of Nimtala station Alom khan police bari - Sarder bari bridge via Mollik bari, Abdur Rashid khan bari ,infornt of Fakirbari road (Ch.00m - 500m) ID NO 506075436 IRIDP-2 bakerganj 506075436 0.50 20.39 MS Disha Enterprise 19.37 30/07/2018 05/02/2019 100 09/04/2019
308 IRIDP-2/BRS/DW-197 (a)Improvement of Halta UP Office (Kander Barir Foot Bridge)-Ranir Hat via Burir Hat, Caradi Satalite Regd. Pry. School & West Caradi Sikder Bari.road (Ch.00m - 900m) ID NO 506073026(b)Construction of 02no 1.60mx1.60m culvert at ch.540m,690m on the same road.(c)Construction of 01no 0.90mx0.90m culvert at ch.301mon the same road. IRIDP-2 bakerganj 506073026 0.90 41.21 M/S. Talukder Construction 39.15 01/08/2018 13/01/2019 100 09/04/2019
309 IRIDP-2/BRS/DW-200 (a)Improvement of Krishnanagar bazar - Sonabaru high School via Jabed Khan Madrasa road (Ch.00m - 380m) ID NO 506074053(b)Construction of 01no 2.0mx2.0m culvert at ch.90m on the same road.(c)Construction of 01no 0.90mx0.90m culvert at ch.333mon the same road. IRIDP-2 bakerganj 506074053 0.38 20.27 M/S. Sohel Enterprise 19.25 23/07/2018 28/02/2019 100 09/04/2019
310 IRIDP-2/BRS/DW-31 Improvement of road from Dudal Senior Madrasha to Sarshi Police Fari via Satraj Bazar (Goma Hat {UZR} via Pilkhana GPS, West Dhudal Regd. Primary School Dhudal UP Office, Madal GPS, Chatra Hat & Sarshi GPS to Sharshi Police Camp) at Ch. 3850m-5400m. IRIDP-2 bakerganj 506073028 1.55 39.98 M/S. Esad & Emad Enterprise 33.44 09/05/2016 02/04/2019 70 09/04/2019
311 IRIDP-2/BRS/DW-53 (a)Improvement of Ruhul Amin road (Shibghata) to Nilgonj Khayaghat (Kalaskati UP Office (bazar) to Satraj Bazar via Vadarikati Govt. Pry. School, Garuria Bazar, Nilganj Hat , Krishnokati Hi & Goma Shibghata Culvert.) (ch.8435m – 9390m) IRIDP-2 bakerganj 506073003 0.96 52.86 M/S. Electro Globe 38.63 20/04/2016 30/12/2017 60 09/04/2019
312 IRIDP-2/BRS/SDW-185 (a)Improvement of Katadia Bus Stand - kanaipura Bajar via katadia Govt. Pry. School road (Ch.1120m - 2500m) ID NO 506074134(b)Construction of 04no 0.90mx0.90m culvert at ch.1610m,2020m,2090m,2420m on the same road. IRIDP-2 bakerganj 506074134 1.38 97.40 M/S. Mirza Enterprise 92.53 18/07/2018 25/04/2019 65 09/04/2019
313 IRIDP-2/BRS/DW-190 (a)Improvement of Bander hat-Bhatshala Govt Pry. School via Principal Bari & Sowkath Sannamath Bari road (Ch.00m - 500m) ID NO 506074059(b)Construction of 01no 3.0mx3.0m culvert at ch.91m on the same road.(c)Construction of 02no 0.90mx0.90m culvert at ch.43m,302m on the same road. IRIDP-2 bakerganj 506074059 0.50 29.89 M/S. Akon Enterprise 28.39 18/07/2018 18/12/2018 40 09/04/2019
314 IRIDP-2/BRS/DW-191 (a)Improvement of Boalia GC (Bahadurpur Gho Hat) to Bakerganj-Neamati GCCR via Kusangal Hat,Syampur Hat,Botra hat,Kafila Hat & Moller Hat.road (Ch.7228m - 7495m) ID NO 506072011(b)Construction of 01no 3.0mx3.0m culvert at ch.7490m on the same road. IRIDP-2 bakerganj 506072011 0.27 20.01 M/S Mother Engineering 19.01 17/07/2018 24/12/2018 60 09/04/2019
315 IRIDP-2/BRS/DW-192 (a)Improvement of Nalua UP Office via Kafilatala High school, Vumi Office - Simultala Bazar.(RHD)road (Ch.900m - 2000m) ID NO 506073048(b)Construction of 01no 2.0mx2.0m culvert at ch.1220m on the same road. IRIDP-2 bakerganj 506073048 1.10 40.06 M/S. Sayed Siddiquer Rahman 38.06 18/07/2018 25/12/2018 0 09/04/2019
316 IRIDP-2/BRS/DW-194 (a)Improvement of Kalaskati Khaya Ghat Haji Bari - Ghanddi Achram road (Ch.00m - 760m) ID NO 506075073(b)Construction of 01no 0.90mx0.90m culvert at ch.580m on the same road. IRIDP-2 bakerganj 506075073 0.76 29.99 M/S. Sikder Arian Enterprise 28.49 17/07/2018 24/12/2018 70 09/04/2019
317 IRIDP-2/BRS/DW-195 Improvement of Kamarkhali GC - Chandramohon GC via Nahalganj Khaya Ghat.[Shingerkati (Barisal Sadar) - Kamarkhali Bazar Road (Bakerganj Upazila)road (Ch.00m - 450m) ID NO 506072013 2,871,637.00 23-Jul-18 2,728,055.15 30-Jan-19 IRIDP-2 bakerganj 506072013 0.45 28.71 M/S. H.R Trading 27.28 23/07/2018 30/01/2019 20 09/04/2019
318 IRIDP-2/BRS/DW-199 Improvement of Dhaporkati High School - Kalu khan Bari via Khondoker Bari road (Ch.650m - 1300m) ID NO 506074161 IRIDP-2 bakerganj 506074161 0.65 25.00 M/S. MA Enterprise 23.75 24/07/2018 24/07/2018 90 09/04/2019
319 IRIDP-2/BRS/DW-202 (a)Improvement of Boro Ragunathpur Ahamad's hat - chairman hat.road (Ch.00m - 800m) ID NO 506075301(b)Construction of 01no 0.90mx0.90m culvert at ch.630m on the same road. IRIDP-2 bakerganj 506075301 0.80 30.25 MS. Doel Enterprise 28.74 23/07/2018 30/12/2018 80 09/04/2019
320 IRIDP-2/BRS/DW-203 (a)Improvement of Niamoti pucca bridge - chanta nutan hat road (Ch.00m - 730m) ID NO 506075246(b)Construction of 01no 1.60mx1.60m culvert at ch.415m on the same road.(c)Construction of 02no 0.90mx0.90m culvert at ch.337m,710m on the same road. IRIDP-2 bakerganj 506075246 0.73 34.97 Progati Traders 33.22 24/07/2018 01/02/2019 0 09/04/2019
321 IRIDP-2/BRS/DW-204 (a)Improvement of Barisal - Patuakhali RHD - Baherchar GC Kalaskati Hat, Chairman Hat & Kastoganj road (Ch.11170m -11830m) ID NO 506072010(b)Construction of 01no 3.0mx3.0m culvert at ch.11450m on the same road.(c)Construction of 01no 1.00mx1.00m culvert at ch.11171m on the same road. 3,604,206.00 1-Aug-18 3,423,995.70 7-Feb-19 IRIDP-2 bakerganj 506072010 0.66 36.04 M/S. Jabana Enterprise 34.23 01/08/2018 07/02/2019 20 09/04/2019
322 IRIDP-2/BRS/DW-205 Improvement of Kalaskati UP Office(Bajar) - Laxmipasa Hat t via Kumar bari bridge, Ammtali ghat & Sadish Govt. Pry. School.road(Ch.800m - 1250m) ID NO 506073021 2,852,152.00 1-Aug-18 2,709,544.40 8-Feb-19 IRIDP-2 bakerganj 506073021 0.45 28.52 M/S. R.S Construction 27.09 01/08/2018 28/02/2019 45 09/04/2019
323 IRIDP-2/BRS/DW-229 Improvement Nalua UP Office via Afalkati Clinic east char Gojalia regd pry school & Nabankhali Bazar to old Mallik Hat(afalkati Lunch Ghat)(Ch.1500m - 1960m) ID NO 506073039 Link. Aziz Mollah bari Panjegana Mosque to Dewli 110.0m IRIDP-2 bakerganj 506073039 0.57 24.89 Md. Anwar Hossain Howlader 23.64 11/02/2019 18/07/2019 0 09/04/2019
324 IRIDP-2/BRS/DW-99 Improvement of Shialghuni Bazar-DC Road-Foraji bari-Chunakhali High School-Kobai Bazar road (ch. 1400m-3400m) IRIDP-2 bakerganj 506074123 2.00 51.80 0.00 0 09/04/2019
325 IRIDP-2/BRS/DW-20 (a)Improvement of road from North Krishnokati GPS - Krishnokati High School via Chowdhuri bari - Siraj Khan Master Bari (Krishnokati Jugi Bari Culver to Krishnokati High School via Krishnokati GPS & Nijamkali Khal Foot Bridge at Ch. 729m-1889m b) Construction of 01no 1.0mx1.0m culvert at ch.828m on the same road. IRIDP-2 bakerganj 506074128 1.16 34.79 Md. Zakir Hossain Mia 34.92 29/06/2016 28/02/2018 100 08/04/2019
326 IRIDP-2/BRS/DW-21 (a)Improvement of road from C&B road - Kaloskati Khayghat road via monir bari (kaleshkati UP office (Vumi Office) - Kaligonj Bazar Bridge via Kalaskati Khayaghat Battala (RHD), Talukder Bari & Asmath Ali Khan (Chowdhury Bari) at Ch. 1450m-2179m b) Construction of 01no 3.0mx3.0m culvert at ch.1889m on the same road. IRIDP-2 bakerganj 506073002 0.73 26.54 M/S. Nibir Traders 19.93 26/04/2016 06/08/2016 100 08/04/2019
327 IRIDP-2/BRS/DW-22 Improvement of road from kanki Bazar Bridge - nurnagar Bazar via Amena Khatun Junior High School (Kanki Bazar to Middle Mahespur Hat via Durgapur & Nurnagar Hat) at Ch. 600m-1680m. IRIDP-2 bakerganj 506074106 1.08 29.97 M/S. Apu Enterprise 28.16 30/06/2016 06/08/2016 100 08/04/2019
328 IRIDP-2/BRS/DW-23 Improvement of road from back side of Nowroj Mia's house - Bangla Bazar via Durgapur GPS & Laxmighar (Padrisibpur UP Office to Bangla Bazar Sluice gate via Puiauta Junior High School) at Ch. 1867m-2817m IRIDP-2 bakerganj 506073007 0.95 24.55 Md. Zakir Hossain Mia 25.74 29/06/2016 30/12/2017 100 08/04/2019
329 IRIDP-2/BRS/DW-24 Improvement of Ragunathpur Go-hat (Kajir hat) - Katuajhuri Khal, (506074246 Upazila Border) at Ch. 00m-400m. IRIDP-2 bakerganj 506074246 0.40 10.34 Md. Zakir Hossain Mia 10.83 29/06/2016 22/08/2016 100 08/04/2019
330 IRIDP-2/BRS/DW-25 (a)Improvement of road from Sattar Mridha Bari - Torab Ali Bhuyan Bari via Esahak Howlader Bari & Gazi Kalu Mosque at Ch. 00m-700m. b) Construction of 01no 4.0mx4.0m culvert at ch.660m on the same road. IRIDP-2 bakerganj 506075425 0.70 29.12 M/S. Farid Uddin 24.85 28/04/2016 30/04/2018 100 08/04/2019
331 IRIDP-2/BRS/DW-26 (a)Improvement of road from Hasem Chairman Bari - Madariar par via Jahangir Khondokar Bari (East side of Hasem Chairman (old) Bari via Kadaria Madrasha, Saympur Kadaria Govt. Primary School, Ansan Member & Masum to Saympur Basabari Bridge) at Ch. 00m-1000m b) Construction of 01no 2.0mx2.0m culvert at ch.445m on the same road. c) Construction of 01no 1.60mx1.60m culvert at ch.880m on the same road. IRIDP-2 bakerganj 506074229 1.00 33.46 M/S. Farid Uddin 28.73 28/04/2016 02/06/2018 100 08/04/2019
332 IRIDP-2/BRS/DW-27 Improvement of road from Robipur D.C Road near Aziz Howlader Shop - Anondo Dhopa Bari (Ward No.02) ( Khairabad hat {Garuria UP Office} to Daporkati Bazar (Godown) via Nilganj Hat, Rabipur GPS (Pearpur Bridge) at Ch.6000m-7435m. IRIDP-2 bakerganj 506073001 1.44 36.94 M/S. Apu Enterprise 31.35 08/05/2016 30/09/2016 100 08/04/2019
333 IRIDP-2/BRS/DW-28 Improvement of road from Abu Sharif house - Bangla Bazar via Lal Sharif house (Kafila Makbul Mira Bari Girder Bridge to Kafila Bazar Saw Mill via Kafila Salehia Khatun Junior High School) at Ch. 00m-1380m. IRIDP-2 bakerganj 506074181 1.38 38.41 Md. Zakir Hossain Mia 34.37 01/08/2016 28/07/2018 100 08/04/2019
334 IRIDP-2/BRS/DW-29 (a)Improvement of road from Kabai Union Islamia College - Hanua Motizan High School via South way Isahak Member bari (Hanua UP Office Bridge to Sarder Bari Foot Bridge via Jainpuri Khanka Sarif Bari ) at Ch. 00m-710m b) Construction of 01no 1.60mx1.60m culvert at ch.210m on the same road. IRIDP-2 bakerganj 506074199 0.71 21.57 M/S. Esad & Emad Enterprise 17.76 09/05/2016 26/06/2016 100 08/04/2019
335 IRIDP-2/BRS/DW-30 Improvement of Mokimabad Atahar Uddin Degree College - Dakhin Balalkati Kalitara GPS via Abdul Kader Howlader Bari (Halta UP Office {Bazar} to DKP Hat {Balaykati Kalitara GPS) via Makimabad Bazar, Dhanshiri Baro Sikder Bari, & Balaikati GPS at Ch. 3800m-4625m. IRIDP-2 bakerganj 506073035 0.83 37.76 M/S. Saad Construction 27.92 12/05/2016 29/11/2016 100 08/04/2019
336 IRIDP-2/BRS/DW-33 Improvement of road from Banglabazar - Biharipur Hossainia Alim Madrasha via Abul Daroga Bari (East side of Bangla Bazar Box Culvert to Wapdder Khal Ghorar Bridge {Bothra} via Biharipur Madrasha) at Ch. 00m-775m. IRIDP-2 bakerganj 506074182 0.78 19.99 Md. Zakir Hossain Mia 17.99 01/08/2016 30/11/2017 100 08/04/2019
337 IRIDP-2/BRS/DW-98 Improvement of Beltola bridge - Bhabanipur Bazar via Aribaki GPS. (Rangashiree UP Office (Baltala Bridge) via Araibagi G. P.S, Bhabanipur G. P.S. School, Karitas Bridge & Gandu Master Bari to Durgapur Sluice Bazar.) road (Ch.00m - 1500m) IRIDP-2 bakerganj 506073043 1.50 39.43 M/S. Esad & Emad Enterprise 34.01 20/02/2017 18/06/2017 100 08/04/2019
338 IRIDP-2/BRS/DW-100 (a)Improvement of Bhorpasha UP Office to Narangol Khayaghat via Dhudal mow bazar side very (Naragal Khaya Ghat Via Krishnokati Jalil Akon Bari.) (ch. 00-1280m)(b) Construction of 01no 1.0mx1.0m culvert at ch.256m on the same road IRIDP-2 bakerganj 506074091 1.28 38.18 M/S. Apu Enterprise 32.35 19/02/2017 14/06/2017 100 08/04/2019
339 IRIDP-2/BRS/DW-101 (a)Improvement of C &B Bhanga pool – Khezura khalgora via md.Joynal Member & Jabbair sikder Bari.(Bharpasa UP Office (Atakati Vangar pool) RHD via Jaynal Member Bari,Jabatunnasa Govt. Pry. School to Samitty Ghar) road.(Ch.00m - 1712m)(b) Construction of 01no 3.0mx3.0m culvert at ch.1062m on the same road IRIDP-2 bakerganj 506073033 1.71 55.53 Md. Jamal Sarder 46.09 12/02/2017 27/02/2018 100 08/04/2019
340 IRIDP-2/BRS/DW-102 (a)Improvement of Balai kati Uttampur kheya ghat – Abdur Rob mollar bari via DKP kheya ghat (Halta Board Govt. Pry. School to Khipaituler Hat.). road.(Ch.3711m - 5020m)(b)Construction of 01no 1.60mx1.60m culvert at ch.5006m on the same road. IRIDP-2 bakerganj 506074184 1.31 40.00 Anukul Chandra Sarkar 33.09 02/03/2017 07/06/2018 100 08/04/2019
341 IRIDP-2/BRS/DW-103 Improvement of Garuria GPS to Dighir par GPS. (Khayrabad Makbul sikder Bari (Justice) to Garuria Govt. Pry. School Via Digir par Govt. Pry. School & lahajuddin howlader Barir Foot Bridge.)road.(Ch00m -1440m) IRIDP-2 bakerganj 506075273 1.44 39.96 M/S. Sayed Siddiquer Rahman 34.66 05/03/2017 27/07/2018 100 08/04/2019
342 IRIDP-2/BRS/DW-105 Improvement of fridpur union vhumi office - hemayet ponditer bari via Khn barir zame mosque. (Faripur hat-kakorda road-east site & Rustom gaji.) road.(Ch.00m - 1400m) IRIDP-2 bakerganj 506075389 1.40 39.77 M/S. Hasan Construction 36.48 01/03/2017 24/06/2018 100 08/04/2019
343 IRIDP-2/BRS/DW-106 Improvement of Zirail Mojumdar Barir South side pucca road - Alauddin talukdarer bridge via madrasa atim khana,durgapasa zirail high school. (Bander Hat to Jirail Ajijia madrasa) road.(Ch.800m - 2300m) IRIDP-2 bakerganj 506074064 1.50 40.90 M/S. Hasan Construction 36.73 30/03/2017 02/05/2018 100 08/04/2019
344 IRIDP-2/BRS/DW-107 Improvement of Hiradhar Bazar - Dewli Azizul haque Mollar Bari via sarot sreetiGPS. (West Side of Dauli Jalil Khan Bari (UZR) via sharoth Shirity Govt. Pry. School. to Kharabad Makbul Sikder Bari.) road.(Ch.975m - 2140m) IRIDP-2 bakerganj 506074174 1.17 29.99 M/S. Sayed Siddiquer Rahman 26.01 05/03/2017 15/06/2017 100 08/04/2019
345 IRIDP-2/BRS/DW-108 (a)Improvement of Meur pucca road attached Salamer mill - Aziz mastarer bari. (Garuria Mayur(sawmill) to Dawli GPS(Dighirpar) road.(Ch.00m - 1260m)(b)Construction of 02no 1.0mx1.0 m culvert at ch.625m & 1255m on the same road. IRIDP-2 bakerganj 506074248 1.26 42.49 M/S. Hasan Construction 39.92 20/02/2017 26/09/2018 100 08/04/2019
346 IRIDP-2/BRS/DW-109 (a)Improvement of Ruhul Amin road – Shatar bazar via Kalikola, Sialguni kundar hat bridge road.(Ch.00m - 592m)(b)Construction of 01no 2x4.0mx4.0 m culvert at ch.141m on the same road. IRIDP-2 bakerganj 506074095 0.59 32.87 M/S. Nibir Traders 29.58 11/01/2017 16/04/2017 100 08/04/2019
347 IRIDP-2/BRS/DW-128 Improvement of Kabai UP office via Kabai Bazar (Islamia College) to Molla bari (Bazar RHHD).( Kabai union Islamia college via Hanua mortijan high school – Khodabox khati Ishaq member bari)road (Ch.00m - 2000m) ID NO 506073014 IRIDP-2 bakerganj 506073014 2.00 67.27 M/s. Lutfur Kabir 63.56 18/09/2017 30/03/2018 100 08/04/2019
348 IRIDP-2/BRS/DW-129 Improvement of Sealghuni bazar - Kabai Hat via East shialguni Govt. Pry. .School, kastoganj Sluice Get, & Kabai Govt. Pry. School..road (Ch.1300m - 2300m) ID NO 506074079 IRIDP-2 bakerganj 506074079 1.00 63.74 M/S. Abul Kalam Azad 57.37 10/09/2017 05/05/2018 100 08/04/2019
349 IRIDP-2/BRS/DW-130 (a)Improvement of Masuakhali Khaya Ghat (UJR) – Moller hat via Masuakhali high School.road (Ch.00m – 850m) ID NO 506514211b)Construction of 01no 2.0mx2.0m culvert at ch.168m on the same road. IRIDP-2 bakerganj 506074211 0.85 37.04 M/S Nahid Enterprise 33.33 14/09/2017 30/07/2018 100 08/04/2019
350 IRIDP-2/BRS/DW-131 (a) Improvement of Padrisibpurp U.P office - Bangla Bajar Sluice Get via Puiauta Junior High School. Road (Ch.5400m - 6200m) ID NO 506073007(b)Construction of 01no 3.0mx3.0 m culvert at ch.5538mon the same road.(c)Construction of 01no 2.0mx2.0 m culvert at ch.6045mon the same road.(d)Construction of 01no 0.625mx0.60m culvert at ch.5450m on the same road. IRIDP-2 bakerganj 506073007 0.80 45.24 M/S Amir Engineering corporation 40.71 20/09/2017 13/01/2019 100 08/04/2019
351 IRIDP-2/BRS/DW-132 Improvement of Parshibpur-katakhali road (Ch.500m - 1220m) ID NO 506075220 IRIDP-2 bakerganj 506075220 0.72 38.94 M/S Oshin Enterprise 35.05 12/09/2017 30/09/2018 100 08/04/2019
352 IRIDP-2/BRS/DW-178 (a) Improvement of UZR(Nanduhar Bridge)-Udoykati UPC road (Ch.00m - 1400m) ID NO 506105084(b)Construction of 01no 3.0mx3.0m culvert at ch.188m on the same road.(c)Construction of 02no 2.0mx2.0m culvert at ch.366m, 520 on the same road.(d)Construction of 04no 0.625mx0.60m culvert at ch.586m,740m,825m,886m on the same road. IRIDP-2 banaripara 506105084 1.40 103.44 M.M. Builders & Engineers LTD. 93.09 26/12/2017 18/02/2019 60 03/04/2019
353 IRIDP-2/BRS/DW-182 (a)Improvement of Alta Sikderbari-Sanker Sikder House Via Norerkati road (Ch.1519m - 2244m) ID NO 506104027(b)Construction of 04no 4.0mx4.0m culvert at ch.221m,1223m,1710m,2234m on the same road.(c)Construction of 01no 3.0mx3.0m culvert at ch.1802m on the same road.(d)Construction of 04no 2.0mx2.0m culvert at ch.526m,593m,684m,1600m on the same road.(d)Construction of 03no 0.625mx0.60m culvert at ch.93m,100m,1112m on the same road. IRIDP-2 banaripara 506104027 0.72 124.20 Md. Mahafuz Khan 111.78 16/04/2018 23/04/2019 30 03/04/2019
354 IRIDP-2/BRS/DW-216 (a)Improvement of Baisari Dak Bangla-Kachua Madrasha Road .(Ch.1955m - 2765m) ID NO 506104033(b)Construction of 01no 0.625mx0.60m culvert at ch.2141m on the same road.(c)Construction of 01no 1.0mx1.0m culvert at ch.2294m on the same road.(d)Construction of 01no 2.0mx2.0m culvert at ch.2415m on the same road. IRIDP-2 banaripara 506104033 0.81 64.05 M/S. Ma Babar Doa Traders 60.84 30/09/2018 07/07/2019 50 03/04/2019
355 IRIDP-2/BRS/DW-217 (a)Improvement of Udaykati union border - bokshobari jume masque - north tetla RNGPS Road .(Ch.00m - 850m) ID NO 506105089(b)Construction of 01no 0.625mx0.60m culvert at ch.346m on the same road.(c)Construction of 02no 1.0mx1.0m culvert at ch.605m,817m on the same road.(d)Construction of 02no 3.0mx3.0m culvert at ch.471m,854m on the same road.(e)Construction of 01no 4.0mx4.0m culvert at ch.290m on the same road. IRIDP-2 banaripara 506105089 0.85 95.06 M/S. Ashraf Builders 90.30 16/09/2018 23/07/2019 40 03/04/2019
356 IRIDP-2/BRS/DW-218 (a)Improvement of Boro Chowlakati Talukder Bari Jam-E-Mosque-Jangalia H/S Road .(Ch.00m - 1060m) ID NO 506104081 and Link-250m(b)Construction of 02no 1.30mx1.30m culvert at ch.350m,850m on the same road.(c)Construction of 01no 3.0mx3.0m culvert at ch.545m on the same road.(d)Construction of 01no 4.50mx4.50m culvert at ch.3430m on Sayedkati UPC-Baisari Bazar Road.ID NO 5061043022 IRIDP-2 banaripara 506103022 1.31 102.89 M/S. Sagar Enterprise 102.89 04/10/2018 11/09/2019 55 03/04/2019
357 IRIDP-2/BRS/DW-219 Improvement of Masrong RHD-Nazirpur Road via H/O Shaajahan Chokder Road .(Ch.820m - 1320m) ID NO 506104059 IRIDP-2 banaripara 506104059 0.50 31.92 M/S. Mitro & Co. 30.32 01/10/2018 08/04/2019 60 03/04/2019
358 IRIDP-2/BRS/MW-177 (a) Maintenance of Baisari Dak Bangla-Kachua Madrasha. road (Ch.00m - 1955m) ID NO (b)Construction of 04no 0.625mx0.60m culvert at ch.42m,137m,1249m & 1730m on the same road. 506104033 IRIDP-2 banaripara 506104033 1.96 42.50 M/S Amir Engineering corporation 38.25 04/01/2018 30/08/2018 100 02/04/2019
359 IRIDP-2/BRS/DW-175 (a)Improvement of Boro Baithsar GPS - Darikar Mohila Madrasha road (Ch.786m - 1255m) ID NO 506104048(b)Construction of 01no 0.625mx0.60m culvert at ch.1113m on the same road. IRIDP-2 banaripara 506104048 0.47 30.02 M/S. Abul Kalam Azad 27.89 24/12/2017 30/11/2018 100 02/04/2019
360 IRIDP-2/BRS/DW-87 (a)Improvement of Royarhat Bridge (East side) - Jhalokati Border Via Gava H/School road(Ch.00m - 1000m) (b) Construction of 03no 0.625mx0.60m culvert at ch.30m,300m&500m on the same road. IRIDP-2 banaripara 506105060 1.00 61.55 M/S. Mitro & Co. 46.36 06/03/2017 30/12/2018 80 02/04/2019
361 IRIDP-2/BRS/DW-88 (a)Improvement of Elluhar UPC - Chander hat road(Ch.00m - 1321m) (b) Construction of 03no 3.0mx3.0m culvert at ch.200m,617m&754m on the same road.(c)Construction of 01no 1.0mx1.0m culvert at ch.520m on the same road. (d)Construction of 02no 0.625mx0.60m culvert at ch.450m&845m on the same road. IRIDP-2 banaripara 506103003 1.32 102.82 M/S. M.T Builders 79.93 06/03/2017 30/03/2019 75 02/04/2019
362 IRIDP-2/BRS/DW-89 (a)Improvement of Masrong RHD - Alta Nesaria Madrasha road(Ch.00m - 1700m) (b) Construction of 01no 2.0mx2.0m culvert at ch.1400m on the same road.(c)Construction of 01no 4.0mx4.0m culvert at ch.1278m on the same road.(d)Construction of 01no 0.625mx0.60m culvert at ch.520m on the same road. IRIDP-2 banaripara 506105053 1.70 113.87 M/S. Talukder Enterprise 85.97 06/03/2017 28/08/2018 80 02/04/2019
363 IRIDP-2/BRS/SDW-160 (a) Improvement of Khodaboxsha GPS to Paschim Chakhar GPS via H/O Aneyt Member, Goailbari Comunity school, H/O A Rob Chowkider BC road (Ch. 500m-1150m)b) Construction of 1No 2.00mx2.0m Culvert at Ch. 764 on the Same Road. c) Construction of 1No 1.0mmx1.0m Culvert at Ch. 811 on the Same Road. d) Improvement of Chakhar bazar-Kalir bazar Via Goterer bari road (Ch. 400m-900m) IRIDP-2 banaripara 506104030 1.15 78.20 PTSL-MAITREE (PVT) LTD 70.38 28/09/2017 28/11/2018 75 02/04/2019
364 IRIDP-2/BRS/MW-176 (a) Maintenance of Bangla Bazar-Zirarkati road (Ch.872m - 3720m) ID NO 506104038(b)Construction of 05no 0.625mx0.60m culvert at ch.1608m,1760m, 1895m, 2240m,3224m on the same road.(c)Construction of 01no 2.0mx2.0m culvert at ch.2370m on the same road. IRIDP-2 banaripara 506104038 2.85 69.53 M/S. Kohinoor Enterprise 62.57 01/01/2018 08/11/2018 80 02/04/2019
365 IRIDP-2/BRS/DW-12 (a) Improvement of road from Baisary UPC to Uttar Nazirpur Dhanhat Road (Dandowat to Baisari Dhakbanglo road via Bauser hat UP. (Proposed Ch. 00m-720m) (b) Construction of 01no 0.625mx0.6m culvert at ch.655m on the same road. (c) Construction of 01no 2.0m IRIDP-2 banaripara 0.72 47.69 M/S. Esad & Emad Enterprise 35.68 10/04/2016 30/12/2017 100  
366 IRIDP-2/BRS/DW-13 Improvement of road from Laskarpur to Mirerhat via Uddan Madrasha (Proposed Ch.500m-1020m) IRIDP-2 banaripara 0.52 29.82 M/S. Farid Uddin 23.22 14/04/2016 10/10/2017 100  
367 IRIDP-2/BRS/DW-14 Improvement of road from Khodaboxsha GPS to Paschim Chakhar GPS via H/O Aneyet Member, Goailbari Community School, H/O A Rob Chowkider BC Road (Ch. 752 m-1300 m) IRIDP-2 banaripara 0.55 33.03 M/S. Esad & Emad Enterprise 24.71 10/04/2016 30/12/2016 100  
368 IRIDP-2/BRS/MW-52 (a)Maintenance of Jagua Mollar Dokan - Amir Hossain house nearTaher Ali Bari-Panchgaon Bazar Road (Ch.00m - 2000m) (b) Construction of 01 no 1.60mx1.60m culvert at ch.1994 on the same road. IRIDP-2 barishal-s 506514124 2.00 37.81 M/S. Electro Globe 27.61 20/04/2016 06/08/2016 100 08/04/2019
369 IRIDP-2/BRS/DW-114 Improvement of Jagua Union Parishad - Karapur Steel Bridge - Bousherhat GC road (Ch.3766m - 4905m) IRIDP-2 barishal-s 506513012 1.14 59.25 M/S. Serajul Alam Sikder 56.97 22/05/2017 11/03/2019 100 08/04/2019
370 IRIDP-2/BRS/DW-115 (a)Improvement of Bousher Hat - Madha Karappur GPS road (Ch.00m - 1355m)(b)Construction of 02no 1.6mx1.6 m culvert at ch.804m &1130 on the same road. IRIDP-2 barishal-s 506515092 1.36 83.84 Orient Trading & Builders LTD. 75.45 07/06/2017 30/11/2018 100 08/04/2019
371 IRIDP-2/BRS/DW-116 (a)Improvement of Chandpura Kerani Bari Pol-Chandpura Maksuda Member Bari River Side Via Mazid How. Hat road (Ch.00m - 1496m)(b)Construction of 02no 1.0mx1.0 m culvert at ch.300m&547m on the same road.(c)Construction of 02no 1.60mx1.0m culvert at ch.792m&1056m on the same road. IRIDP-2 barishal-s 506514094 1.50 93.48 Orient Trading & Builders LTD. 84.13 01/06/2017 10/01/2019 100 08/04/2019
372 IRIDP-2/BRS/DW-117 Construction of 02no 1.6mx1.6 m culvert at ch.67.0m & 135m Jagua Sher-E-Bangla Hat-Jashim Uddin Talukder House.road IRIDP-2 barishal-s 506514118 6.50 M/S. Santu Traders 6.50 10/08/2017 30/05/2018 100 08/04/2019
373 IRIDP-2/BRS/DW-118 Improvement of Ramkati-Ramkati Bazar Via Panbaria Adarsha Gram & Panbaria Madrasha.road (Ch.1090m - 3126m) ID NO 506514013 IRIDP-2 barishal-s 506514013 2.04 59.81 M/S. Rupali Construction 62.79 10/08/2017 30/11/2018 100 08/04/2019
374 IRIDP-2/BRS/DW-122 (a)Improvement of Raipasha H/S-kulakana Son Field Via Fakir Hat road (Ch.00m - 1310m) ID NO 506514003(b)Construction of 03no 2.0mx2.0 m culvert at ch.350m,598m&873m on the same road.(c)Construction of 02no 1.00mx1.00m culvert at ch.652m&798m on the same road. 10,226,139.04 10-Aug-17 9,203,525.12 IRIDP-2 barishal-s 506514003 1.31 102.26 M/S. Mohiuddin Ahmed 92.03 10/08/2017 28/02/2019 100 08/04/2019
375 IRIDP-2/BRS/DW-124 (a)Improvement of Taltoli Bazar-Lamchari hat road (Ch.5000m - 6700m) ID NO 506514139(b)Construction of 01no 2x4.0mx4.0m culvert at ch.5550m on the same road.(c)Construction of 03no 1.60mx1.60m culvert at ch.5565m,6203m&6688m on the same road. IRIDP-2 barishal-s 506514139 1.70 140.04 M/S. Mohiuddin Ahmed 126.03 10/08/2017 15/01/2019 100 08/04/2019
376 IRIDP-2/BRS/DW-44 Improvement of Charbaria Gilatoli Kheyaghat – End of Natunchar Via Natunchar GPS road (Ch.0.00m-1600m) 6,991,508.00 20-Apr-16 5,133,816.96 IRIDP-2 barishal-s 506515073 1.60 69.91 M/S. Electro Globe 51.33 20/04/2016 30/12/2017 45 08/04/2019
377 IRIDP-2/BRS/DW-45 Improvement of Nehalganjhat - Baroikandi road (ch.00m-1100m) IRIDP-2 barishal-s 506515036 1.10 50.94 M/S. Electro Globe 37.18 20/04/2016 30/12/2017 75 08/04/2019
378 IRIDP-2/BRS/DW-47 (a)Improvement of Jagua Hogla H/S - Najor Ali Chaprashi Bari Via Mohammad Ali H/S road (ch.650m-1650m) (b) Construction of 01no 1.60mx1.60m culvert atch.1130 m on the same road. IRIDP-2 barishal-s 506514117 1.00 49.50 M/S. Electro Globe 36.37 20/04/2016 30/12/2017 35 08/04/2019
379 IRIDP-2/BRS/DW-48 (a)Improvement of Bukhainagor GC-Charmonai Lanchghat road (Ch.00m-1000m) (b) Construction of 01 no 1.60mx1.60m culvert at ch.595 on the same road. IRIDP-2 barishal-s 506514022 1.00 56.76 M/S. Electro Globe 41.52 20/04/2016 30/12/2017 75 08/04/2019
380 IRIDP-2/BRS/DW-49 (a)Improvement of Chandromohan UP Office-Veduria Lanchghat via Chandromohan GC.road (Ch.1850m-3075m) IRIDP-2 barishal-s 506513011 1.23 56.10 M/S. Electro Globe 56.10 20/04/2016 30/12/2017 40 08/04/2019
381 IRIDP-2/BRS/DW-50 (a)Improvement of Chandpura Bairagi Bari R&H Durgapur hat Via Chandpur UP road (Ch.2500m-3500m) (b) Construction of 01no 1.00mx1.0m culvert at ch.3116m on the same road. IRIDP-2 barishal-s 506513005 1.00 56.23 M/S. Electro Globe 41.01 19/05/2016 30/12/2017 70 08/04/2019
382 IRIDP-2/BRS/DW-51 Improvement of Charkaremji Mora Nadi - Charaicha Poler hat road (ch.1200m - 2630m) IRIDP-2 barishal-s 506515029 1.43 61.60 M/S. Electro Globe 41.75 19/05/2016 30/12/2017 70 08/04/2019
383 IRIDP-2/BRS/SDW-59 (a)Improvement of Bisarad C&B – Barakandi C&B road via Patang Bipon doctor bari (Patang Sukhoronjon master bari Radha krishno seba asrom to sadu goaler bari)Road (Ch.3817m - 5100m) Asrom & Mondir link road 100.0m (b) Construction of 01 no 1.60mx1.60m culvert at ch.4811m on the same road. IRIDP-2 barishal-s 506514062 1.38 62.40 M/S. Auditi Enterprise 51.36 16/06/2016 15/06/2017 15 08/04/2019
384 IRIDP-2/BRS/DW-111 (a)Improvement of Charkawa UP Officee -Charkaramji Asrayn Project Via Diner Pry. schoo,Ghoper Hat.road (Ch.00m - 1558m)(b)Construction of 01no 1.6mx1.6 m culvert at ch.805.0m on the same road. IRIDP-2 barishal-s 506514025 1.56 87.08 Orient Trading & Builders LTD. 78.37 01/06/2017 15/10/2018 95 08/04/2019
385 IRIDP-2/BRS/DW-112 (a)Improvement of Char Aicha Gazi Bari School-Ghoper hat (West Side).road (Ch.671m - 1671m)(b)Construction of 01no 3.0mx3.0 m culvert at ch.1384m on the same road. IRIDP-2 barishal-s 506514028 1.00 65.06 M/S. Rupali Construction 58.56 01/06/2017 07/01/2018 70 08/04/2019
386 IRIDP-2/BRS/DW-119 Improvement of Kashipur Bakarir Poll - Purbo Billa Bari GPS - Mukondropotty GPS..road (Ch.00m – 1000m) ID NO 506514186 IRIDP-2 barishal-s 506514186 1.00 59.16 M/S. Nupur Store 53.25 13/08/2017 20/05/2018 55 08/04/2019
387 IRIDP-2/BRS/DW-120 (a) Improvement of Karnokati Red Crecent to Karnokati Anowar Hossain Bari road (Ch.00m - 1275m) ID NO 506514079(b)Construction of 02no 1.6mx1.6 m culvert at ch.982m &1073mon the same road. IRIDP-2 barishal-s 506514079 1.28 77.87 M/S. Mohiuddin Ahmed 70.08 10/08/2017 14/10/2018 70 08/04/2019
388 IRIDP-2/BRS/DW-121 (a)Improvement of Veduria Lanch Ghat-Khorshed Chowkider Bari – East Veduria GPS road (Ch.1550m - 2000m) ID NO 506515054(b)Construction of 01no 1.6mx1.6 m culvert at ch.1775 on the same road. IRIDP-2 barishal-s 506515054 0.45 31.91 M/S. Santu Traders 28.72 19/10/2017 05/12/2018 65 08/04/2019
389 IRIDP-2/BRS/DW-125 Improvement of Karapur Mira Bari Poll-Afjal Khan Bari Via Mia Khar Bari Mosque.road (Ch.00m - 564m) ID NO 506515089 IRIDP-2 barishal-s 506515089 0.56 56.55 M/S. Mohiuddin Ahmed 5089.00 10/08/2017 30/05/2019 45 08/04/2019
390 IRIDP-2/BRS/SDW-187 Improvement of Moulavir hat Dhopa Barir More-Shaheber hat Gabtala Via Biswash Bari. road (Ch.1150m-1700m) ID NO.506514155 IRIDP-2 barishal-s 506514155 0.55 33.75 M/S. Ma Babar Doa Traders 32.06 26/06/2018 03/01/2019 70 08/04/2019
391 IRIDP-2/BRS/SDW-207 (a)Improvement of Karnokati RR GPS - Abdul Sabur Khan Bari - Muktijoddah Abul Basharer Bari road (Ch.00m - 335m) ID NO 506515172(b)Construction of 01no 0.90mx0.90m culvert at ch.300m on the same road. IRIDP-2 barishal-s 506515172 0.34 26.13 M/S. Siam Enterprise 24.82 30/08/2018 07/03/2019 0 08/04/2019
392 IRIDP-2/BRS/DW-228 (a)Improvement Ramkati-Ramkati Bazar Via Panbaria Adarsha Gram & Panbaria Madrasha.road (Ch.3126m - 4610m) ID NO 506514013(b)Construction of 02no 1.60mx1.60m culvert at ch.3529m,3567m on the same road. 6,884,094.00 18-Feb-19 6,539,889.30 IRIDP-2 barishal-s 506514013 1.48 68.84 M/S. Rahat Enterprise 65.39 18/02/2019 25/11/2019 10 08/04/2019
393 IRIDP-2/BRS/DW-230 (a)Chandipur Achintala Mosque - Muktijoddah Ahsan Ali Bari Ch.603m - 980m) ID NO 506515211 & link towards khanbari185.0m, Muktijoddah Ahasan, Shajahan bari 152.0m(b)Construction of 01no 1.0mx1.0m culvert at ch.755m on the same road. IRIDP-2 barishal-s 506515211 0.71 52.19 0.00 0 08/04/2019
394 IRIDP-2/BRS/MW-58 (a)Maintenance of Uttar Karapur Sikder Bari Mosque -Hazi Bari Road (Ch.00m - 1495m) (b) Construction of 01 no 1.60mx1.60m culvert at ch.501m on the same road. IRIDP-2 barishal-s 506515009 1.50 33.01 M/S. Auditi Enterprise 26.18 16/06/2016 18/11/2018 100 07/04/2019
395 IRIDP-2/BRS/DW-60 (a)Improvement of Dharmadi molar bridge – Maydan khola via Katurakati Salam Khandojar house Road (Ch.500m - 1464m) Link. Mohila madrasha 180.0m, Darul Ulum madrasha 170.0m & Mosque 30.0m(b) Construction of 03no 1.60mx1.60m culvert at ch.684m,748m & 1224m on the same road.(c) Construction of 01no 0.375mx0.45m culvert at ch.938m on the same road. 7,085,057.00 Mir Jasim Uddin 31-Oct-16 5,313,517.01 IRIDP-2 barishal-s 506514142 1.34 70.85 Mir Jasim Uddin 53.13 31/10/2016 30/03/2018 100 07/04/2019
396 IRIDP-2/BRS/SDW-62 (a) Improvement of Taltali-Sayestabad Bazar Via West Char Aicha road (Ch.00m - 1000m) & Link road 120m.(b) Construction of 01no 2x4.0mx4.0m culvert at ch.10.0m on the same road.(c) Construction of 02no 1.60mx1.60m culvert at ch.750m & 995m on the same road. IRIDP-2 barishal-s 506515017 1.12 88.48 M/S. Khan Engineering Corporation 68.78 24/01/2017 12/02/2018 100 07/04/2019
397 IRIDP-2/BRS/DW-46 (a)Improvement of Kashipur Six Mil0e-Lakutia Babur hat road (ch.1000m-2000m) (b) Construction of 01 no 1.60mx1.60m culvert at ch.1675 on the same road. IRIDP-2 barishal-s 506514140 1.00 65.38 Md. Shamsul Alam 47.24 20/04/2016 30/03/2018 100 07/04/2019
398 IRIDP-2/BRS/DW-46 (a)Improvement of Kashipur Six Mile-Lakutia Babur hat road (ch.1000m-2000m) (b) Construction of 01 no 1.60mx1.60m culvert at ch.1675 on the same road. IRIDP-2 barishal-s 506514140 1.00 65.38 Md. Shamsul Alam 47.24 20/04/2016 30/03/2018 100 04/04/2019
399 IRIDP-2/BRS/DW-110 (a)Improvement of Charkawa Karnokati Bhola Road Delowerer Bari - late Mazed Khan Bari via AL-Aksha Mosque.road (Ch.00m - 1052m) & Link road 90.0m(b)Construction of 02no 1.0mx1.0 m culvert at ch.203m &465m on the same road. 6,399,130.10 6-Mar-17 4,479,468.13 IRIDP-2 barishal-s 506515160 1.14 63.99 M/S. Shuley Traders 44.79 06/03/2017 30/12/2017 100 04/04/2019
400 IRIDP-2/BRS/DW-113 Improvement of Darmadi Rattron Holader Bari To 27No Word Via kalam khan Bari.road (Ch.00m – 490.0m) 2,470,035.00 24-May-17 2,470,035.00 IRIDP-2 barishal-s 506515132 0.49 24.70 M/S. Khondokar Brothers 24.70 24/05/2017 25/05/2018 100 04/04/2019
401 IRIDP-2/BRS/DW-123 (a)Improvement of Gilatoli Mina brick field- Shahalom khan bari Road (Ch.00m - 584m) ID NO 506515504(b)Construction of 01no 1.6mx1.6 m culvert at ch.350 on the same road. IRIDP-2 barishal-s 506515504 0.58 34.95 M/S. Kohinoor Enterprise 31.46 26/07/2017 15/06/2018 100 04/04/2019
402 IRIDP-2/BRS/MW-126 a) Maintenance of Textile-Lakutia Road via Amirgonj Bazar.road (Ch.4144m - 6314m) ID NO 506514138b) Construction of 01no 0.625mx0.60m culvert at ch.4622m on the same road. IRIDP-2 barishal-s 506514138 2.17 68.50 M/S. Mohiuddin Ahmed 61.65 10/08/2017 15/11/2018 100 04/04/2019
403 IRIDP-2/BRS/MW-127 a) Maintenance of Taltoli Bazar-Lamchari hat road (Ch.2610m - 4000m) ID NO 506514139b)Construction of 01no 1.60mx1.60m culvert at ch.3645m on the same road. IRIDP-2 barishal-s 506514139 1.39 51.37 M/S. Mohiuddin Ahmed 46.23 10/08/2017 15/12/2018 100 04/04/2019
404 IRIDP-2/BRS/MW-158 a) Maintenance of C & B Raintree tala (RHD) - Basher hat via Sholnahat road (Ch.2000m -4000m) ID NO 506514141.(b) Construction of 01no 2.0m x 2.0 m culvert at ch.2269m on the same road.(c) Construction of 01no 1.60 m x 1.60 m culvert at ch.3119m & 3486m on the same road. IRIDP-2 barishal-s 506514141 2.00 64.13 M/S. Khandaker Shahin Ahmed 57.72 10/08/2017 15/11/2018 100 04/04/2019
405 IRIDP-2/BRS/DW-140 (a)Improvement of Chandrahar Bazar-Noapara GPS road (Ch.00m - 1700m) ID NO 506324118(b)Construction of 01no 0.625mx0.6 m culvert at ch.132 on the same road. IRIDP-2 gouranadi 506324118 1.70 102.66 Nojiron Corporation 107.74 15/11/2017 07/01/2019 55 02/04/2019
406 IRIDP-2/BRS/DW-54 Improvement of Road Chandrahar bazar - Nalchira Bazar via Kali bari Bazar road (ch.00m-1850m) IRIDP-2 gouranadi 506324016 1.85 102.79 M/S. Feroj Alom 106.36 23/06/2016 27/02/2018 100 31/03/2019
407 IRIDP-2/BRS/DW-55 Improvement of North Magura Eidga – North Magura forkania madrasha. road(Ch.00-1300m.) IRIDP-2 gouranadi 506324036 1.30 79.08 M/S. Talukder Enterprise 82.98 19/06/2016 19/05/2017 100 31/03/2019
408 IRIDP-2/BRS/DW-56 Improvement of Kalabariah RPS - Nalchira hospital via kutubshar mazar road (Ch. 00-1020m) IRIDP-2 gouranadi 506324062 1.02 58.31 M/S. Talukder Enterprise 61.18 19/06/2016 13/04/2017 100 31/03/2019
409 IRIDP-2/BRS/DW-74 (a)Improvement Of Bagar - DSB hat via Baghar GPS Road (Ch.00m - 1198m)(b) Maitenance of 01no. 14.00m Bridge at ch.1171m on the same road. IRIDP-2 gouranadi 506324087 1.20 72.55 M/S. Sharif Enterprise 72.55 08/01/2017 28/07/2018 100 31/03/2019
410 IRIDP-2/BRS/DW-75 (a)Improvement Of Labutoli Bazar-Badarpur GC Road via Mir Kutub Shah Mazar (Mahilara Up office old Kasemabad (RHD)-Nalchira Bazar) Road (Ch.1750m - 3762m)(b) Construction of 01no 0.625mx0.60m culvert at ch.2756m on the same road. IRIDP-2 gouranadi 506324104 2.01 115.26 M/S. G.M. Construction 120.94 20/03/2017 30/11/2018 100 31/03/2019
411 IRIDP-2/BRS/DW-139 (a)Improvement of Salta Bazar-Vallukshi Bazar.road (Ch.00m - 1010m) ID NO 506324116b)Construction of 01no 0.625mx0.60m culvert at ch.508m on the same road.c)Construction of 01no 2x4.0mx4.0m culvert at ch.797m on the same road. IRIDP-2 gouranadi 506324116 1.01 76.60 Nojiron Corporation 80.39 15/11/2017 14/02/2018 100 31/03/2019
412 IRIDP-2/BRS/DW-141 Improvement of Illa Vanga - East Dumuria Govt Primary school Via Karikorpara road (Ch.00m – 1246m) IRIDP-2 gouranadi ID NO 506325025 1.25 87.88 Nojiron Corporation 87.88 15/11/2017 30/11/2018 100 31/03/2019
413 IRIDP-2/BRS/DW-143 Improvement of Tara High School(NHW) - Tarakupi GPS via Abdul Hye Master House road (Ch.00m - 1000m) ID NO 506325038 IRIDP-2 gouranadi 506325038 1.00 63.34 Nojiron Corporation 66.57 15/11/2017 28/02/2019 100 31/03/2019
414 IRIDP-2/BRS/SDW-157 Conastruction of 3x4.50mx5.0m culvert at ch:1410m on Donerkandi purbapara Kalimondir - Bisnowkarati Rice mill road. IRIDP-2 gouranadi 506324080 28.44 Nojiron Corporation 29.85 15/11/2017 20/04/2018 100 31/03/2019
415 IRIDP-2/BRS/DW-1 (a) Improvement of Road from Batazore GC to Laxmonkathi bazar via Dhakhin Pashim para.(Batazor GC to sholok bazar via jugikathi from ch.1013-2013m. (b) Construction of 02nos 0.625mx0.0.60m culvert at ch.1120m & 1455m on the same road. IRIDP-2 gouranadi 1.00 68.83 M/S. Pizush Enterprise 57.76 21/02/2016 19/11/2016 100  
416 IRIDP-2/BRS/DW-2 (a) Improvement of road from Nalchira up office to Diasur bazar via Char Ramjanpur GPS (Ch.750-1750m.) (b) Construction of 01no 0.625mx0.0.60m culvert at ch.1305m on the same road. IRIDP-2 gouranadi 1.00 61.91 M/S. Pizush Enterprise 51.28 21/02/2016 19/11/2016 100  
417 IRIDP-2/BRS/DW-3 Improvement of road from Satkabla to Gournadi Utter Chandsi GPS-Gournadi Bondor Via Utter palordi GPS (Ch. 00-1415m) IRIDP-2 gouranadi 1.41 88.66 M/S. Pizush Enterprise 74.45 21/02/2016 19/11/2016 100  
418 IRIDP-2/BRS/DW-152 (a)Improvement of Moultala High School(RHD)-Kilerhat (UZR)Via Rezbi Khan Bari road (Ch.00m - 1700m) ID NO 506365006(b)Construction of 02no 0.625mx0.60m culvert at ch.337m&1155m on the same road. IRIDP-2 hizla 506365006 1.70 96.59 M/S. Dawn Corporation 86.93 28/09/2017 04/07/2018 85 07/04/2019
419 IRIDP-2/BRS/DW-181 (a) Improvement of Baherchar-Baushia Road (Ch.2700m - 3200m) ID NO 506365012(b)Construction of 02no 0.625mx0.60m culvert at ch.183m,435m on the same road. IRIDP-2 hizla 506365012 0.50 32.68 Md. Mahafuz Khan 32.62 16/04/2018 23/10/2018 90 07/04/2019
420 IRIDP-2/BRS/DW-41 (a)Improvement of road from Abda Bazar-Kakuria Bazar (Ch. 00m-1000m.) (b) Construction of 01no 0.625mx0.9m culvert at ch.825m on the same road. IRIDP-2 hizla 506365054 1.00 36.80 M/S. Islam Brothers 30.41 07/04/2016 06/08/2016 100 04/04/2019
421 IRIDP-2/BRS/DW-42 Improvement of road from Bander Hat - Molovir Hat(Ch. 1600m-2957m.) IRIDP-2 hizla 506364009 1.37 47.67 M/S. B B International 38.84 03/04/2016 09/10/2016 100 04/04/2019
422 IRIDP-2/BRS/DW-43 (a) Improvement of road from Khunna Hospital(RHD) via Kawmi Madrasha -Baherchar (UZR) (Ch.1500m-2693m.) (b) Construction of 01 no 3.0mX3.0m culvert at ch. 1546m on the same road. 4,732,192.00 3-Apr-16 3,188,158.46 IRIDP-2 hizla 506365049 1.19 47.32 M/S. B B International 31.88 03/04/2016 30/06/2016 100 04/04/2019
423 IRIDP-2/BRS/DW-65 (a)Improvement Of Dhanushikder Hat Via Abupur Kheya Ghat - Memania Taker Hat Road (Ch.6605m - 7255m)(b) Construction of 01no 0.625mx0.60m culvert at ch.6630m on the same road. 2,048,814.00 1,934,287.40 IRIDP-2 hizla 506362005 0.65 20.48 M/S. Apu Enterprise 19.34 29/01/2017 30/05/2017 100 04/04/2019
424 IRIDP-2/BRS/DW-66 Improvement Of Dhanushikder Hat Via Abupur Kheya Ghat - Memania Taker Hat Road (Ch.7515m - 8705m) IRIDP-2 hizla 506362005 1.19 42.87 M/S. B.B International 41.73 16/01/2017 30/03/2017 100 04/04/2019
425 IRIDP-2/BRS/DW-67 (a)Improvement Of Hizla Taker Bazar (Upazila H/Q)-Mehendigonj Upazila Road (Via Moddah Bawsia Gps) (Ch.628m-2692m)(b) Construction of 01no 4.0mx4.0m culvert at ch.1900m on the same road. IRIDP-2 hizla 506362010 2.06 74.80 Md. Sirajul Islam Hanif 74.79 28/02/2017 30/12/2017 100 04/04/2019
426 IRIDP-2/BRS/DW-68 Improvement Of Char Pattni vanga Jalil Bapary Bari via Reg Pry School (Ch.00m - 3000m) IRIDP-2 hizla 506365040 3.00 83.65 M/S. Lutful Kabir 75.29 02/04/2017 21/01/2018 100 04/04/2019
427 IRIDP-2/BRS/DW-151 Improvement of Barjalia UP office -Kaisma Bazar via Food Goudaun & College road (Ch.00m - 1010m) ID NO 506363003 IRIDP-2 hizla 506363003 1.01 29.76 M/S Amir Engineering corporation 26.78 04/10/2017 28/03/2018 100 04/04/2019
428 IRIDP-2/BRS/DW-169 (a)Improvement of Kawria - Bandorhat road (Ch.00m - 2000m) ID NO 506365020(b)Construction of 01no 0.625mx0.60m culvert at ch.1090m on the same road. 7,897,069.46 26-Nov-17 7,107,362.51 IRIDP-2 hizla 506365020 2.00 78.97 M/S Amir Engineering corporation 71.07 26/11/2017 04/04/2018 100 04/04/2019
429 IRIDP-2/BRS/DW-170 (a)Improvement of Goler Hat (RHD) Via Moddah Mashkata Ali Ahmed GPS - Bander Hat road (Ch.00m - 1945m) ID NO 506365062(b)Construction of 02no 0.625mx0.60m culvert at ch.595m & 1403 on the same road. IRIDP-2 hizla 506365062 1.95 62.23 M/S Amir Engineering corporation 56.00 26/11/2017 20/05/2018 100 04/04/2019
430 IRIDP-2/BRS/DW-63 Improvement Of Dhanushikder Hat Via Abupur Kheya Ghat - Memania Taker Hat Road (Ch.400m - 995m) 1,559,755.00 29-Jan-17 1,472,567.23 IRIDP-2 hizla 506362005 0.60 15.59 M/S. Apu Enterprise 14.72 29/01/2017 30/03/2017 100 04/04/2019
431 IRIDP-2/BRS/DW-64 Improvement Of Dhanushikder Hat Via Abupur Kheya Ghat - Memania Taker Hat Road (Ch.2545m - 6500m) IRIDP-2 hizla 506362005 3.96 109.52 M/S. Lutful Kabir 108.40 29/01/2017 28/02/2019 100 04/04/2019
432 IRIDP-2/BRS/DW-168 (a)Improvement of Maulavir hut(UZR) Via Uttor Guabatia Gps- Kawria Bazer Dhanusikder hut road(UZR) road (Ch.00m - 2460m) ID NO 506364015(b)Construction of 02no 0.625mx0.60m culvert at ch.1110m & 2205m on the same road. IRIDP-2 hizla 506364015 2.46 134.23 M/S. Kohinoor Enterprise 120.80 26/11/2017 30/01/2019 100 04/04/2019
433 IRIDP-2/BRS/DW-171 (a)Improvement of Harinathpur Farid Khonder Bari(UZR) -Veri Bandth (UZR) road (Ch.00m - 1110m) ID NO 506364022(b)Construction of 02no 0.625mx0.60m culvert at ch.520m & 835 on the same road. IRIDP-2 hizla 506364022 1.11 33.28 M/S Amir Engineering corporation 29.95 26/11/2017 11/09/2018 100 04/04/2019
434 IRIDP-2/BRS/DW-145 Improvement of Noyakhali-Aligonj GC .road (Ch.800m - 1800m) ID NO 506625095 IRIDP-2 mehendiganj 506625095 1.00 36.30 M/S. Hasan Construction 34.47 27/09/2017 04/03/2018 70 07/04/2019
435 IRIDP-2/BRS/DW-146 Improvement of Biddanondopur UP-Dafaderhat (Baro Bridge) road (Ch.00m - 2100m) ID NO IRIDP-2 mehendiganj 506623020 2.10 69.56 M/S. Hasan Construction 66.07 27/09/2017 30/05/2018 60 07/04/2019
436 IRIDP-2/BRS/DW-149 (a)Improvement of Mathertoly Bazar- Fokiraer pool Via keshipur High School Road(Ch.650m - 2500m) ID NO 506625345(b)Construction of 02no 0.625mx0.6 m culvert at ch.1500m&1700m on the same road. IRIDP-2 mehendiganj 506625345 1.85 69.64 M/S. Hasan Construction 65.45 27/09/2017 04/03/2018 15 07/04/2019
437 IRIDP-2/BRS/DW-179 Improvement of Char Ekkaria Uttarchar Brick Field (RAMB) – Hijla River Ghat Road (Ch.000m - 490m) ID NO 506625419 IRIDP-2 mehendiganj 506625419 0.49 29.98 M/S Amir Engineering corporation 28.47 28/03/2018 05/10/2018 40 07/04/2019
438 IRIDP-2/BRS/DW-180 Improvement of Gabtoli Bazar-Posshim Bongga GPS Via Hurarhat,Adarsha Gram,Noli Bari road (Ch.300m - 3025m) ID NO 506625025 IRIDP-2 mehendiganj 506625025 2.73 73.81 M/S Mother Engineering 70.12 24/07/2018 01/05/2019 30 07/04/2019
439 IRIDP-2/BRS/DW-40 Improvement of road from Jangalia RHD - Mainuddin Majhi Bari ( Ch. 00m-600m.) IRIDP-2 mehendiganj 506625341 0.60 19.90 M/S. Hasan Construction 17.08 02/03/2016 06/08/2016 100 04/04/2019
440 IRIDP-2/BRS/DW-61 Improvement of Muktijodda Mostafa Kamal H/S – Natun Bazar Road (Ch.00m - 800m) 2,529,605.00 2,440,309.12 IRIDP-2 mehendiganj 506625357 0.80 25.29 M/S. Talukder Enterprise 24.40 22/11/2016 15/03/2017 100 04/04/2019
441 IRIDP-2/BRS/DW-70 (a)Improvement Of Shonamukhi Mazikandi house – Kasem sir house bridge road .(Ch.00m - 702m)(b) Construction of 01no 2.0mx2.0m culvert at ch.304m on the same road. IRIDP-2 mehendiganj 506625418 0.70 29.49 M/S. Lutful Kabir 27.72 07/05/2017 30/10/2018 100 04/04/2019
442 IRIDP-2/BRS/DW-148 (a)Improvement of Lata UP (Gabtoli Bazar)- Notun Kasherhat via Hurar hat Road (Ch.2038m - 3840m) ID NO 506623019(b)Construction of 01no 0.625mx0.6 m culvert at ch.2501 on the same road. 5,855,712.13 4-Oct-17 5,270,140.91 IRIDP-2 mehendiganj 506623019 1.80 58.55 M/S Amir Engineering corporation 52.70 04/10/2017 04/05/2018 100 04/04/2019
443 IRIDP-2/BRS/DW-150 Improvement of Sikdererhat-H/O Khales Bhuiyan road (Ch.00m - 1370m) ID NO 506625054 IRIDP-2 mehendiganj 506625054 1.37 35.66 M/S. Lutful Kabir 33.31 10/10/2017 30/05/2018 100 04/04/2019
444 IRIDP-2/BRS/DW-165 (a)Improvement Dhakin Charhogla GPS-Moddo Charhogla Mosqueroad (Ch.00m - 1000m) ID NO 506625107(b)Construction of 01no 0.625mx0.60m culvert at ch.618m on the same road. 3,103,569.48 12-Nov-17 2,948,391.00 IRIDP-2 mehendiganj 506625107 1.00 31.03 M/S Amir Engineering corporation 29.48 12/11/2017 30/07/2018 100 04/04/2019
445 IRIDP-2/BRS/DW-166 Improvement South Char Hogla GPS - North side Gopal sikder Bari via kalimondir, patarhat - kajirhat GC..road (Ch.00m - 576m) ID NO 506625360 IRIDP-2 mehendiganj 506625360 0.58 17.12 M/S Amir Engineering corporation 16.26 12/11/2017 22/05/2018 100 04/04/2019
446 IRIDP-2/BRS/DW-167 Improvement of Char hogla fridom fighter Sayed vhoya Bari - Nijamuddin Bepari Bari Road.(Ch.00m - 630m) ID NO 506625362 IRIDP-2 mehendiganj 506625362 0.63 18.73 M/S Amir Engineering corporation 17.80 12/11/2017 30/09/2018 100 04/04/2019
447 IRIDP-2/BRS/DW-35 (a)Improvement of road from Bangla Bazar to Notun Kasherhat via Lata UP (Gabtoli Bazar) to Hurar hat ( Ch. 580m-2080m.) b) Construction of 01no 2.0mx2.0m culvert at ch.874m on the same road. (c) Construction of 03nos 0.625mx0.60m culvert at ch.1169m,1394m&1614m on the same road. IRIDP-2 mehendiganj 506623002 1.50 55.90 M/S. Hasan Construction 47.99 02/03/2016 28/11/2016 100 04/04/2019
448 IRIDP-2/BRS/DW-39 (a)Improvement of road from Darichar Khajuria Senior Madrasha-Orakul road via Gazirhat (Ch. 00m-1500m.) (b) Construction of 01no 1.50mx1.50m culvert at ch.100m on the same road. 4,689,777.00 2-Mar-16 4,036,562.21 IRIDP-2 mehendiganj 506625237 1.50 46.89 M/S. Hasan Construction 40.36 02/03/2016 28/02/2019 100 04/04/2019
449 IRIDP-2/BRS/DW-69 (a)Improvement Of H/O Hanif Bepari - Bajidkha Kheyaghat via Char Bhouduba Jame -Mosque.(Ch.00m - 664m) IRIDP-2 mehendiganj 506625247 0.66 17.47 M/S. Hasan Construction 17.47 29/01/2017 30/08/2018 100 04/04/2019
450 IRIDP-2/BRS/DW-147 (a)Improvement of Lata UP (Gabtoli Bazar)-Bangla Bazar road (Ch.680m – 3441m) ID NO 506623002(b)Construction of 01no 0.625mx0.6 m culvert at ch.1089 on the same road. IRIDP-2 mehendiganj 506623002 2.76 84.68 M/S Amir Engineering corporation 76.21 04/10/2017 10/02/2019 100 04/04/2019
451 IRIDP-2/BRS/DW-38 (a)Improvement of road from Kasipur High School-Sahid Babul Sarok via Sree Hori Narawon Nath Bari ( Ch. 00m-1510m.) (b) Construction of 01no 0.625mx0.60m culvert at ch.973 m on the same road. 5,179,695.00 2-Mar-16 4,482,405.73 IRIDP-2 mehendiganj 506625356 1.51 51.79 M/S. Hasan Construction 44.82 02/03/2016 20/04/2018 100 04/04/2019
452 IRIDP-2/BRS/DW-71 Improvement Of Charhogla Shonamukhi Ukil bari – Pokki mai bari .(Ch.00m - 1360m) IRIDP-2 mehendiganj 506625417 1.36 51.80 M/S. Hasan Construction 43.98 29/01/2017 30/01/2019 95 04/04/2019
453 IRIDP-2/BRS/DW-72 Improvement Of Vandarighata to Kashipur High school..(Ch.00m - 2275m) 8,692,121.00 15-Jan-17 7,382,654.46 IRIDP-2 mehendiganj 506625227 2.27 86.92 M/S. Hasan Construction 73.82 15/01/2017 30/03/2019 80 04/04/2019
454 IRIDP-2/BRS/DW-73 Improvement of Patnighata Bridge (Sadekpur) - Razzak kabiraz House via Akon house. .(Ch.00m - 940m) IRIDP-2 mehendiganj 506625296 0.94 32.25 M/S. Lutful Kabir 30.47 07/05/2017 19/10/2018 75 04/04/2019
455 IRIDP-2/BRS/DW-34 (a)Improvement of road from Andermanik UP - Bonikerhat Bazar via Ekkoterhat Bazar & Khunna Bazar ( Ch. 315m-4000m.) b) Construction of 01no 2.0mx2.0m culvert at ch.2772m on the same road. (c) Construction of 03nos 0.625mx0.60m culvert at ch.860m,2240m&2643m on the same road. IRIDP-2 mehendiganj 506623001 3.69 102.40 M/S. Lutful Kabir 94.72 27/06/2016 04/03/2017 100 03/04/2019
456 IRIDP-2/BRS/DW-36 (a)Improvement of Road from Alimabad UP (Majkajir char Bazar)-Sreepur Bazar via Gaguria Bazar, Mohisa Khayaghat (Ch. 1625m -3190m.) (b) Construction of 03nos 0.625mx0.60m culvert at ch.1835m,2323m & 3025m on the same road. IRIDP-2 mehendiganj 506623003 1.57 56.97 M/S. Hasan Construction 48.87 02/03/2016 30/11/2016 100 03/04/2019
457 IRIDP-2/BRS/DW-37 (a)Improvement of road from Nasirkha Hat Khayaghat-Union Complex via Chilmari Sluice Gate (Ch. 00m-1870m.) (b) Construction of 03nos 0.625mx0.60m culvert at ch.832m,976m&1690 m on the same road. IRIDP-2 mehendiganj 506625152 1.87 55.02 M/S. Hasan Construction 47.20 02/03/2016 30/12/2017 100 03/04/2019
458 IRIDP-2/BRS/DW-97 (a)Improvement of Laxmipur high school – Dakkin Laxmipur Lanch ghat via Laxmipur Rahman master bari, Mordon hawladar bari mosque gate , community clinic, joybangla bazar road.(Ch.00m - 4500m)(b) Construction of 01no 4.0mx4.0m culvert at ch.4500m on the same road.(a)Improvement of Mirdar hat GC-Nazirpur GCCR via Madrashar hat,Bangla Bazar road.(Ch.5580m - 6500m)(b) Construction of 01no 4.0mx4.0m culvert at ch.5580m on the same road.(c) Construction of 01no 2.0mx2.0m culvert at ch.6050m on the same road. IRIDP-2 muladi 506692004 5.42 291.61 M/S. Dhara Enterprise 240.55 19/01/2017 28/08/2018 100 03/04/2019
459 IRIDP-2/BRS/SDW-159 (a)Improvement of Jamdder bari - Akoter hat via Bahadurpur H/S (K).road (Ch.00m - 1300m) ID NO 506695025(b)Construction of 01no 2.0mx2.0m culvert at ch.2269m on the same road. IRIDP-2 muladi 506695025 1.30 88.22 Orient Trading & Builders LTD. 79.39 10/09/2017 28/11/2018 100 03/04/2019
460 IRIDP-2/BRS/DW-163 Improvement of Yousaf Ali Khan bari-Sholaghar Tozom Ali bari (C). road (Ch.00m - 510m) ID NO 506695012 IRIDP-2 muladi 506695012 0.51 16.23 Md. Khair Hossain 15.62 20/12/2017 02/04/2018 100 03/04/2019
461 IRIDP-2/BRS/DW-155 (a)Improvement of Char Malia Beparir Hat - Kaetmara GPS - Sherajul haq Bhuyan bari Charkalekhan UP UNR road (Ch.1350m - 1950m) ID NO 506694095(b)Construction of 01no 4.0mx4.0m culvert at ch.1650m on the same road. IRIDP-2 muladi 506694095 0.60 45.67 Orient Trading & Builders LTD. 41.10 10/09/2017 10/03/2019 100 03/04/2019
462 IRIDP-2/BRS/DW-156 Improvement of Khasher Hat - Repotar Khan Kabir bari via Bangla bazar(M).road (Ch.3900m - 4410m) ID NO 506694003 IRIDP-2 muladi 506694003 0.51 27.55 M/S. Monalisa 27.55 11/09/2017 28/02/2019 100 03/04/2019
463 IRIDP-2/BRS/DW-161 Improvement of Talukdar(Khajurtala) Hat to Poyeaka Rastom Fokir bari via Ali Sikder bari bridge(G).road (Ch.1800m - 3500m) ID NO 506694016 IRIDP-2 muladi 506694016 1.70 100.32 Orient Trading & Builders LTD. 90.29 06/12/2017 28/02/2019 100 03/04/2019
464 IRIDP-2/BRS/DW-164 (a) Improvement of Laxmipur H/S -Near Bridge Kaitmara Registry School road (Ch.00m - 1000m) ID NO 506694030(b)Construction of 01no 1.30mx1.30m culvert at ch.380m on the same road. IRIDP-2 muladi 506694030 1.00 34.43 M/S Amir Engineering corporation 30.99 17/12/2017 28/02/2019 100 03/04/2019
465 IRIDP-2/BRS/DW-94 (a)Improvement of Kazir Char High School - Moddho Kazirchar Dakhil Madrasah at Kazir Char Union road.(Ch.00m - 1000m)(b)Construction of 01no 2.0mx2.0m culvert at ch.125m on the same road. IRIDP-2 muladi 506694082 1.00 62.59 M/S. Dhara Enterprise 46.00 19/01/2017 30/10/2018 70 03/04/2019
466 IRIDP-2/BRS/DW-95 (a)Improvement of Talukder hat( khajurtala) - Safipur UP via Charkaleka UP baparir hat road.(Ch13850m -15050m)(b) Construction of 01no 4.0mx4.0m culvert at ch.14643.00m on the same road. IRIDP-2 muladi 506693001 1.20 81.67 M/S. Dhara Enterprise 60.44 19/01/2017 30/11/2018 70 03/04/2019
467 IRIDP-2/BRS/DW-96 Improvement of Safipur UP-Montazpur Bazar- Dorgabari –Uttar char Padda GPS – Bhoai bazar road.(Ch.00m - 1550m) IRIDP-2 muladi 506693010 1.55 89.27 M/S. Dhara Enterprise 66.05 19/01/2017 30/10/2018 70 03/04/2019
468 IRIDP-2/BRS/DW-154 (a)Improvement of Boalia Natun hat - West Boalia GPS - Taleb kari Moydan bridge (S).road (Ch.150m - 1150m) ID NO 506694028(b)Construction of 01no 1.3mx1.30m culvert at ch.480m on the same road. IRIDP-2 muladi 506694028 1.00 59.48 M/S. Serajul Alam Sikder 53.53 30/08/2017 18/04/2019 70 03/04/2019
469 IRIDP-2/BRS/DW-162 (a)Improvement of Char Malia Beparir Hat - Kaetmara GPS - Sherajul haq Bhuyan bari Charkalekhan UP UNR .road (Ch.00m - 1350m) ID NO 506694095(b)Construction of 01no 1.30mx1.30m culvert at ch.400m on the same road.(c)Construction of 01no 3.0mx3.0m culvert at ch.500m on the same road. IRIDP-2 muladi 506694095 1.35 55.27 M/S Amir Engineering corporation 49.74 17/12/2017 02/11/2018 90 03/04/2019
470 IRIDP-2/BRS/DW-186 (a)Improvement of Charkalekha UP - Mirder hat G.C.Via Nomokanda-Ekotar hat.road (Ch.2000m - 3078m) ID NO 506693007(b)Construction of 01no 4.0mx4.0m culvert at ch.1750m on the same road.(c)Construction of 02no 1.30mx1.30m culvert at ch.2005m &2310 on the same road. IRIDP-2 muladi 506693007 1.08 78.79 M/S. Habib Sons 74.85 27/08/2018 04/06/2019 30 03/04/2019
471 IRIDP-2/BRS/DW-224 Improvement of Muladi Barak Master bari-Char Laxmipur Borro Moaidan (M)road (Ch.370m - 770m) ID NO 506695045 IRIDP-2 muladi 506695045 0.40 17.60 M/S. Momin Enterprise 16.72 10/02/2019 17/07/2019 10 03/04/2019
472 IRIDP-2/BRS/DW-225 Improvement of Chilmari Kowsar Sader bari-M P hat via Rasid Khan bari(N-B).road (Ch.00m - 1724m) ID NO 506694031 IRIDP-2 muladi 506694031 1.72 72.55 M/S. Rahat Enterprise 68.92 18/02/2019 25/11/2019 20 03/04/2019
473 IRIDP-2/BRS/DW-10 Improvement of road from Mirdar hat GC-Nazirpur GC via Madrashar hat, Bangla Bazar at Ch. 7500 - 10350 m (Starting Banimordan Hat -MP hat) IRIDP-2 muladi 2.85 113.63 M/S. Lutful Kabir 99.42 14/03/2016 13/12/2016 100  
474 IRIDP-2/BRS/DW-11 (a) Improvement of road from Talukder hat (Khajurtala) to Safipur UP via Charkalakhan UP-Beparirhat (Ch. 2850-5750m) (b) Construction of 01no 3.0mx3.0m culvert at ch.5112m on the same road. (c) Construction of 03nos 1.3mx1.3m culvert at ch. 3580m, 4050m & IRIDP-2 muladi 2.90 183.91 M/S. Alvi Construction 146.33 04/03/2016 02/12/2016 100  
475 IRIDP-2/BRS/DW-208 (a)Improvement of Narayanpur-Nitayandi road (Ch.00m - 1000m) ID NO 506945039(b)Construction of 02no 0.625mx0.60m culvert at ch.250m,455m on the same road. IRIDP-2 uzirpur 506945039 1.00 71.76 M/S. Sardar Trading 68.18 04/11/2018 11/07/2019 0 03/04/2019
476 IRIDP-2/BRS/DW-209 Improvement of Mulpain – Hostisundo road (Ch.1000m - 2013m) ID NO 506945243 IRIDP-2 uzirpur 506945243 1.01 65.12 M/S. Sikder Construction 61.87 30/09/2018 07/06/2019 0 03/04/2019
477 IRIDP-2/BRS/DW-210 Improvement of Satla GC (Akota Bazar) - Kandi R&H road (Ch.00m - 180m) ID NO 506942006 IRIDP-2 uzirpur 506942006 0.18 15.33 M/S. Sadia Enterprise 14.56 30/09/2018 03/04/2019 5 03/04/2019
478 IRIDP-2/BRS/DW-211 Improvement of Otra Raster matha Bazar - Jugirkanda Gala Hat road (Ch.00m - 810m) ID NO 506945216 IRIDP-2 uzirpur 506945216 0.81 48.29 M/S. Saira Enterprise 45.87 01/10/2018 08/04/2019 30 03/04/2019
479 IRIDP-2/BRS/DW-212 (a)Improvement of Boharkati H/O Akkas Molla - Uzirpur Dhamura road Battola Steel bridge. Road .(Ch.00m - 640m) ID NO 506945203(b)Construction of 01no 0.625mx0.60m culvert at ch.425m on the same road. IRIDP-2 uzirpur 506945203 0.64 30.14 M/S. Sardar Trading 28.63 30/09/2018 07/04/2019 0 03/04/2019
480 IRIDP-2/BRS/DW-213 (a)Improvement of Ballabpur - H/O Rashid Molla- Bairkathi - Tatipara GPS Road .(Ch.500m - 1050m) ID NO 506945237(b)Construction of 01no 3.0mx3.0m culvert at ch.630m on the same road. IRIDP-2 uzirpur 506945237 0.55 44.61 M/S. Habib Sons 42.38 04/11/2018 11/05/2019 0 03/04/2019
481 IRIDP-2/BRS/MW-214 Maintenance of Uzirpur UZ HQ - Daserhat Kheyaghat - Narayanpur R&H road (Ch.00m - 1000m) IRIDP-2 uzirpur 506942020 1.00 33.95 M/S. Ferdousi Construction 32.25 09/10/2019 16/02/2019 20 03/04/2019
482 IRIDP-2/BRS/SDW-221 a) Improvenment of Baherghat H/O Jahirul Master towards northroad (Ch.00m-480m) ID NO 506945287b) Construction of 01 no 3.0mx3.0m culvert at ch. 280m on the same road(b) Construction of 1no 0.625mx0.60m culvert at ch.195m on the same road. IRIDP-2 uzirpur 506945287 0.48 43.17 M/S. Mitro & Co. 41.01 22/10/2018 29/04/2019 10 03/04/2019
483 IRIDP-2/BRS/SDW-226 (a) Improvement Gazirpar Kader Market – Ohab Master House (Barakhota – Gazirpar) Road (Ch.00m - 600m) ID NO 506945017(b)Construction of 02no 0.625mx0.60m culvert at ch.205m,465m on the same road. IRIDP-2 uzirpur 506945017 0.60 47.59 M/S. Warisha Enterprise 45.21 17/02/2019 24/08/2019 20 03/04/2019
484 IRIDP-2/BRS/DW-16 Improvement of road from Kalir Bazar GC-Barisal-dhaka NHW-GC School (Kalir Bazar GC-Barisal-Dhaka NHW, Shikerpur) at Ch. 1254m-1754m. IRIDP-2 uzirpur 506942015 0.50 37.07 M/S. Mitro & Co. 28.49 07/04/2016 30/12/2016 100 02/04/2019
485 IRIDP-2/BRS/DW-17 Improvement of road from Dhamura GC-Satla GC via Ramerkathi-Muribari at Ch. 4930m-5430m. IRIDP-2 uzirpur 506943009 0.50 39.97 M/S. Mitro & Co. 32.07 07/04/2016 30/03/2017 100 02/04/2019
486 IRIDP-2/BRS/DW-19 (a) Improvement of road from Kuchiarpar Wabda-Jamirbari GPS Road (Kuchiarpar GCCR to North Kalvila Road) at Ch. 00m-500m (b) Construction of 01no 0.625mx0.60m culvert at ch.210m on the same road IRIDP-2 uzirpur 506945123 0.50 33.97 M/S. Talukder Enterprise 26.82 11/04/2016 18/11/2016 100 02/04/2019
487 IRIDP-2/BRS/DW-78 Improvement Of Dhamra GC (kacha Bazar) - Harta GC- Satla GC - Paisarhat GC Road (Ch.25950m - 27400m) IRIDP-2 uzirpur 506942004 1.45 90.32 M/S. Lutful Kabir 69.38 02/02/2017 30/05/2018 100 02/04/2019
488 IRIDP-2/BRS/DW-79 (a)Improvement Chawdhury hat - Malikanda Madrasha via Uzirpur satla Battala road (Ch.00m - 680m)(b) Construction of 01no 0.625mx0.60m culvert at ch.580m on the same IRIDP-2 uzirpur 506945058 0.68 37.47 M/S. Mitro & Co. 27.93 06/03/2017 30/03/2018 100 02/04/2019
489 IRIDP-2/BRS/DW-82 (a)Improvement of Ideal College Panchagrame Ballobpur bridge - Bairkathi Jamtala school road.(Ch.00m - 500m)(b) Construction of 01no 0.625mx0.60m culvert at ch.330m on the same road. IRIDP-2 uzirpur 506945237 0.50 27.06 M/S. Sarfuddin Trading & Co 20.63 01/03/2017 24/11/2018 100 02/04/2019
490 IRIDP-2/BRS/DW-84 (a)Improvement of Joysree bazar-Sattar Dhalir shop - Bharshakati Cyclone shelter road.(Ch.00m - 1050m)(b) Construction of 01no 0.625mx0.60m culvert at ch.809m on the same road. IRIDP-2 uzirpur 506945209 1.05 54.05 M/S. Talukder Enterprise 40.98 02/03/2017 30/11/2018 100 02/04/2019
491 IRIDP-2/BRS/MW-215 Maintenance of Otra UP (Habibpur) - Munshirtaluk - Kuralia Bazar road (Ch.00m - 2068m) ID NO 506943003 IRIDP-2 uzirpur 506943003 2.06 48.57 M/S. Ferdousi Construction 46.14 01/11/2018 28/02/2019 100 02/04/2019
492 IRIDP-2/BRS/DW-18 Improvement of road from Uzirpur H/Q - Bamrail UP Office - Ghandeshor Bazar at Ch. 4120m-4720 IRIDP-2 uzirpur 506943007 0.60 35.69 Md. Sirajul Islam Hanif 27.53 04/04/2016 30/07/2018 65 02/04/2019
493 IRIDP-2/BRS/DW-80 (a)Improvement of Habibpur Talimul Quran madrasha - Habibpur Hindupara Sarbojanin kalimondir road (Ch.00m - 780m)(b) Construction of 01no 0.625mx0.60m culvert at ch.400m on the same road. IRIDP-2 uzirpur 506945210 0.78 42.99 M/S. Mitro & Co. 32.99 06/03/2017 28/02/2018 75 02/04/2019
494 IRIDP-2/BRS/DW-81 (a)Improvement of Agailjara Border (Datrabad) - Sholok Hazi M.A. Rashid Secondery School road.(Ch.00m - 650m)(b) Construction of 02no 0.625mx0.60m culvert at ch.115m& 330m on the same road. 2-Mar-17 2,854,591.82 IRIDP-2 uzirpur 506945214 0.65 34.92 M/S. Sharif Enterprise 28.54 02/03/2017 30/12/2018 60 02/04/2019
495 IRIDP-2/BRS/DW-83 (a)Improvement of Sanuhar - Atipara road.(Ch.00m - 900m)(b) Construction of 02no 0.625mx0.60m culvert at ch.212 & 545m on the same road. IRIDP-2 uzirpur 506945087 0.90 45.99 M/S.Sharif Enterprise 37.59 02/03/2017 30/03/2018 60 02/04/2019
496 IRIDP-2/BRS/DW-85 (a)Improvement of Gojendro Wapda bridge- Ramerkathi Bayddo bari mondir road.(Ch.00m - 517m)(b) Construction of 01no 4.0mx4.0m culvert at ch.00m on the same road. IRIDP-2 uzirpur 506945026 0.52 38.29 M/S. Mitro & Co. 29.24 06/03/2017 28/02/2018 45 02/04/2019
497 IRIDP-2/BRS/DW-86 (a)Improvement of Sikarpur RHD to mulpain Via Nurmohamad master house road.(Ch.00m - 1000m) link.150.0m(b) Construction of 03no 0.625mx0.60m culvert at ch.150m,340m&520m on the same road. IRIDP-2 uzirpur 506945105 1.15 56.83 M/S. Sharif Enterprise 46.45 02/03/2017 04/12/2018 65 02/04/2019
498 IRIDP-2/BRS/DW-172 (a) Improvement of Mulpain Thakurhat - Uttar Sakral GPS - Norshingha Munshibari bridge - Sukragoda - Hawladerbari bridge - Barakota UP( Daberkul chowmohoni road) Road (Ch.4250m - 4850m) ID NO 506944095(b)Construction of 02no 0.625mx0.60m culvert at ch.4315m,4720m on the same road. IRIDP-2 uzirpur 506944095 0.60 46.51 M/S. Kohinoor Enterprise 41.86 01/01/2018 18/05/2019 60 02/04/2019
499 IRIDP-2/BRS/DW-173 (a)Improvement of Bamrail-Boharkati road (Ch.00m - 1000m) ID NO 506944026(b)Construction of 04no 0.625mx0.90m culvert at ch.205m,305m,870m &920m on the same road.(c)Construction of 01no 4.0mx4.0m culvert at ch.12m on the same road. IRIDP-2 uzirpur 506944026 1.00 82.53 M.M. Builders & Engineers LTD. 74.28 26/12/2017 18/02/2019 80 02/04/2019
500 IRIDP-2/BRS/DW-174 (a)Improvement of Goria Setla khola - Mugakathi Govt. Primary School road..(Ch.00m - 1020m) ID NO 506945261(b)Construction of 04no 0.625mx0.90m culvert at ch.103m,376m,580m &720m on the same road.(c)Construction of 01no 2.0mx2.0m culvert at ch.870m on the same road. IRIDP-2 uzirpur 506945261 1.02 79.42 M.M. Builders & Engineers LTD. 71.48 26/12/2017 18/02/2019 40 02/04/2019
501 IRIDP-2/BRS/DW-15 (a) Improvement of road from Satla Bazar-Bagda Bazar Road (Satla H/S-Bagda Border) at Ch. 00m-539m. (b) Construction of 01no 4.0mx4.0m culvert at ch.5m on the same road. IRIDP-2 uzirpur 0.54 43.61 M/S. Sadman Builders 34.23 11/04/2016 30/12/2016 100  
502 MDSP-II-7-LPL-0-NW-01 Construction of 58 nos GPS cum Disaster Shelters with connecting Road MDSP barishal-s 44.20 29381.28 Navana Construction Ltd. 34500.14 11/12/2016 30/06/2021 95 28/02/2023 Only One Package for entire district covering 8 Upazilas. 4 shelters in Babuganj, 14 shelters in Bajerganj, 12 shelters in Banaripara, 5 shelters in Gauranadi, 5 shelters in Hizla, 8 shelters in Mehendiganj, 5 shelters in Muladi and 5 shelters in Barisal Sadar Upazila.
503 e-Tender/NBIDNNGPS/BAR/AGA/2017-2018/W1-00289 SOUTH EAST ASHKAR NBIDNNGPS agailjhara 78.43 M/S. Sharif Enterprise 82.31 26/08/2018 31/08/2019 30  
504 e-Tender/NBIDNNGPS/BAR/AGA/2017-2018/W1-00290 PURBO BAG DHADAS PARA PRIMARY SCHOOL NBIDNNGPS agailjhara 70.51 M/S. sharif Enterprise 74.00 19/08/2018 19/08/2019 0  
505 e-Tender/NBIDNNGPS/BAR/AGA/2017-2018/W1-01152 DOKKHIN ASKOR PRIMARY SCHOOL NBIDNNGPS agailjhara 74.46 M/S. Sharif Enterprise 78.15 30/05/2018 30/05/2019 45  
506 e-Tender/NBIDNNGPS/BAR/AGA/2017-2018/W1-01155 UTTAR BARPAIKA PRIMARY SCHOOL NBIDNNGPS agailjhara 81.40 M/S. sharif Enterprise 85.43 06/06/2018 30/05/2019 55  
507 e-Tender/NBIDNNGPS/BAR/BAB/2017-2018/W1-01140 UTTAR ROHOMOTPUR PRIMARY SCHOOL NBIDNNGPS babuganj 78.57 Md Jakir Hossain Mia 74.64 26/06/2018 25/06/2019 5  
508 e-Tender/NBIDNNGPS/BAR/BAB/2017-2018/W1-01158 UTTAR BANGLA PRIMARY SCHOOL NBIDNNGPS babuganj 50.26 Rupali Construction 47.76 01/07/2018 30/06/2019 10  
509 e-Tender/NBIDNNGPS/BAR/BAB/2017-2018/W1-01160 DOKKHIN VUTERDIYA ADORSO PRIMARY SCHOOL NBIDNNGPS babuganj 78.57 M/S Ferdousi construction 74.64 18/06/2018 18/06/2019 5  
510 e-Tender/NBIDNNGPS/BAR/BAB/2017-2018/W1-01163 MAJHER CHAR NON GOVT PRIMARY SCHOOL NBIDNNGPS babuganj 70.51 Rupali Construction 66.99 01/07/2018 30/06/2019 25  
511 e-Tender/NBIDNNGPS/BAR/BAB/2018-2019/W1-01161 POCHIM BAHERCHOR GOSHKATHI PRIMARY SCHOOL NBIDNNGPS babuganj 58.57 M/S Jagua Khan brothers 55.64 28/11/2018 27/08/2019 0  
512 e-Tender/NBIDNNGPS/BAR/BAB/2018-2019/W1-02512 UTTAR VUTERDIA PRIMARY SCHOOL NBIDNNGPS babuganj 103.81 M/S Brommo Enterprise,Prop- Narayan Chandra 98.62 0  
513 e-Tender/NBIDNNGPS/BAR/BAB/2018-2019/W1-02513 PURBO VUTERDIA NOBARUN PRIMARY SCHOOL NBIDNNGPS babuganj 62.38 M/S Parves Traders,Prop-Mainul Hossain Parves 59.26 0  
514 e-Tender/NBIDNNGPS/BAR/BAB/2018-2019/W1-02514 PURBO KEDARPUR PRIMARY SCHOOL NBIDNNGPS babuganj 71.95 M/S Brommo Enterprise,Prop- Narayan Chandra 68.36 0  
515 e-Tender/NBIDNNGPS/BAR/BAK/2017-2018/W1-00291 MOLLAPARA FARUQUE PRIMARY SCHOOL NBIDNNGPS babuganj 70.51 M/s Jagua Khan Brothers. 66.99 35  
516 e-Tender/NBIDNNGPS/BAR/BAK/2017-2018/W1-01135 UTTAR KAZLA KATHI PRIMARY SCHOOL NBIDNNGPS babuganj 74.99 M/s Jagua Khan Brothers. 71.24 35  
517 e-Tender/NBIDNNGPS/BAR/BAK/2017-2018/W1-01137 POCHIM DUDHOL PRIMARY SCHOOL NBIDNNGPS babuganj 53.30 M/s oshin Enterprise. 50.64 0  
518 e-Tender/NBIDNNGPS/BAR/BAK/2017-2018/W1-01138 DOKKHIN NARANGOL PRIMARY SCHOOL NBIDNNGPS babuganj 92.63 M/s sikder and Sons. 88.00 30  
519 e-Tender/NBIDNNGPS/BAR/BAN/2017-2018/W1-01133 DARIABAD PRIMARY SCHOOL NBIDNNGPS banaripara 83.60 M/S. SR Enterprise 79.42 29/05/2018 28/05/2019 0  
520 e-Tender/NBIDNNGPS/BAR/BAN/2017-2018/W1-01144 CHIRAPARA SER- BANGAL PRIMARY SCHOOL NBIDNNGPS banaripara 79.05 M/S. Khan Store 75.10 10/07/2018 09/07/2019 0  
521 e-Tender/NBIDNNGPS/BAR/BAN/2017-2018/W1-01145 WEST BAGHRA NGPS NBIDNNGPS banaripara 73.64 M/S. Mahi Enterprise 69.96 28/05/2018 28/05/2019 0  
522 e-Tender/NBIDNNGPS/BAR/BAN/2017-2018/W1-01146 GHATAPARA PRIMARY SCHOOL NBIDNNGPS banaripara 83.32 M/S. Shovo Traders 79.15 28/05/2018 28/05/2019 10  
523 e-Tender/NBIDNNGPS/BAR/BAN/2017-2018/W1-1143 UTTAR SYED KATHI PRIMARY SCHOOL NBIDNNGPS banaripara 82.53 M/S. Khan Store 78.41 10/07/2018 09/07/2019 10  
524 e-Tender/NBIDNNGPS/BAR/BAR/2017-2018/W1-01187 PARCHAIM CHANDPURA CAMMUNITY PRIMARY SCHOOL NBIDNNGPS barishal-s 95.65 M/S. Nabil Enterprise 90.87 07/06/2018 09/06/2019 25  
525 e-Tender/NBIDNNGPS/BAR/BAR/2017-2018/W1-01679 A. KADER KHAN PRIMARY SCHOOL NBIDNNGPS barishal-s 50.26 M/S. Desh Builders 47.75 21/05/2018 26/05/2019 40  
526 e-Tender/NBIDNNGPS/BAR/BAR/2018-2019/W1-02331 DOKKHIN KORAPUR ADRSO PRIMARY SCHOOL NBIDNNGPS barishal-s 77.48 M/S Barisal Construction 73.61 0  
527 e-Tender/NBIDNNGPS/BAR/MEH/2017-2018/W1-00038 POCHIM AZIMPUR PRIMARY SCHOOL NBIDNNGPS mehendiganj 78.43 M/S. Kohinoor Enterprise 70.59 11/04/2018 19/04/2019 82  
528 e-Tender/NBIDNNGPS/BAR/MEH/2017-2018/W1-00039 SOLDI PRIMARY SCHOOL NBIDNNGPS mehendiganj 78.43 M/S. Mohiuddin Ahmed 70.59 04/04/2018 12/04/2019 72  
529 e-Tender/NBIDNNGPS/BAR/MEH/2017-2018/W1-00040 MODDHO CHOR ROY PRIMARY SCHOOL NBIDNNGPS mehendiganj 78.43 M/S. Kohinoor Enterprise 70.59 04/04/2018 12/04/2019 85  
530 e-Tender/NBIDNNGPS/BAR/MEH/2017-2018/W1-00041 BIDDANONDO PUR PRIMARY SCHOOL NBIDNNGPS mehendiganj 70.51 M/S. Kohinoor Enterprise 63.46 04/04/2018 12/04/2019 64  
531 e-Tender/NBIDNNGPS/BAR/MEH/2017-2018/W1-00042 KOLISAR PAR PRIMARY SCHOOL NBIDNNGPS mehendiganj 78.43 M/S. Mohiuddin Ahmed 70.59 11/04/2018 19/04/2019 90  
532 e-Tender/NBIDNNGPS/BAR/MEH/2017-2018/W1-00043 DOKKHIN JANGALIYA PRIMARY SCHOOL NBIDNNGPS mehendiganj 78.43 M/S. Apu Enterprise 23.39 10/09/2018 10/06/2019 0  
533 e-Tender/NBIDNNGPS/BAR/MEH/2017-2018/W1-00044 CHOR POCHIM PRIMARY SCHOOL NBIDNNGPS mehendiganj 82.82 M/s A Ali & sons 78.68 01/11/2018 05/11/2019 20  
534 e-Tender/NBIDNNGPS/BAR/MEH/2017-2018/W1-00045 ASOK ALI HALDER MEMORIYAL NBIDNNGPS mehendiganj 81.29 M/S. Mohiuddin Ahmed 73.17 04/04/2018 19/04/2019 90  
535 e-Tender/NBIDNNGPS/BAR/MEH/2017-2018/W1-00046 MODDHO CHANPUR PRIMARY SCHOOL NBIDNNGPS mehendiganj 78.43 Md. Zakir Hossain Mia 23.39 10/09/2018 10/06/2019 0  
536 e-Tender/NBIDNNGPS/BAR/MUL/2017-2018/W1-00294 UTTAR TEROCHOR PRIMARY SCHOOL NBIDNNGPS muladi 78.43 M/S Sirajul Alom Sikder 75.83 31/05/2018 31/05/2019 5  
537 e-Tender/NBIDNNGPS/BAR/MUL/2017-2018/W1-01190 PAIKPARA PRIMARY SCHOOL NBIDNNGPS muladi 84.76 M/S Mezba Construction 80.52 30/05/2018 31/05/2019 15  
538 RERMP-3/BA RIS/W-27 Maintenance of Rural Roads Barisal() RERMP-3 barishal-s N/A 36 3175.50 N/A 3175.50 40 1146.00 36 26/12/2021 Ongoing
539 SP14200/Chandrapara FCD Subproject Chandrapara khal re-excavation(ch.00-3340m) Baka khal re-excavation(ch.00-1020m) Mushuria branch khal re-excavation(ch.00-990m) Referenced line section(5 Nos.) Chandrapara Embankment re-sectioning(ch.1300-2914m) SSSWRDP babuganj   6.96 100 88.01 LCS parveen begum 88.01 29/04/2018 02/04/2018 30/04/2019 100 87.20 100 30/11/2022 Completed
540 SP25314/Madhabpasa Subproject Uttar Lafadi khal re-excavation(ch.00-3500m) Birpasha khal re-excavation(ch.00-950m) Sultan master barir khal re-excavation(ch.00-2200m) Referenced line section(9 Nos.) Bamboo bridge(11 Nos.) Shibbari Khal re-xcavation (Ch:0.00m - 2760.00m) 2023-24 Badamtali Khal re-xcavation (Ch:0.00m - 2300.00m) 2023-24 Kashaghata Khal re-xcavation (Ch:0.00m - 1500.00m) 2023-24 Kalikhala Khal re-xcavation (Ch:0.00m - 1260.00m) 2023-24 Const. of 10 Nos. Ref. lined Section on 04 Khals, SP Identf. sign board 2, SP Area Indication Post 2 Nos. | 2023-24 SSSWRDP babuganj   14.47 83 171.88 zayeda begum 171.88 20/03/2024 31/03/2024 30/04/2024 79 143.16 83 30/11/2022 Ongoing
541 SP43043/Dehergati Subproject Vuter Khal Re-excavation (Ch: 0.00 - 4600 m) Mullar Khal Re-excavation (Ch: 0.00 - 2860 m) Reference Lined Section (8 nos.) + SP Identification Signboard (2 nos.) Purba Rabindranagar Khal re-xcavation (Ch:0.00m - 2540m) 2023-24 Kalibari Khal re-xcavation (Ch:0.00m - 1280m) 2023-24 Chairman Bari Khal re-xcavation (Ch:0.00m - 1260m) 2023-24 Nomarjhuri Khal re-xcavation (Ch:0.00m - 1880m) 2023-24 Daragabari Khal re-xcavation (Ch:0.00m - 1500m) 2023-24 Chairman Bari Branch Khal re-xcavation (Ch:0.00m - 1080m) 2023-24 Const. of 11 Nos. Ref. lined Section on 06 Khals, SP Identf. sign board 2, SP Area Indication Post 2 Nos.| 2023-24 SSSWRDP babuganj   16.96 76 113.75 LCS 113.75 12/03/2024 25/03/2024 30/04/2024 79 87.45 76 30/11/2022 Ongoing
542 SP44081/Thakur Mollik Subproject Re-excavation of Maniruddin Khal (Ch: 0.00 - 1170 m) Re-excavation of Char Hogal Patia Khal (Ch: 0.00 - 1340 m) Re-excavation of Padar Barir Khal (Ch: 0.00 - 700 m) Re-excavation of Sarishar Khal (Ch: 0.00 - 900 m) Re-excavation of Silandia Khal (Ch: 0.00 - 1570 m) Maintenance of WMCA Office, Ref Line Section (10 nos.) and SP Signboard (2 nos.) - SSSWRDP babuganj   5.68 85 46.72 Shahin & Jahanara 46.72 28/10/2020 01/12/2020 30/04/2021 100 39.99 85 30/11/2022 Completed
543 SP45150/Chandpasha Subproject Re-excavation of Daria badh Khal (Ch: 0 m - 2200 m) Re-excavation of Kolatola Khal (Ch: 0 m - 1150 m) Re-excavation of Molla barir Khal (Ch: 0 m - 1050 m) Re-excavation of Napit barir Khal (Ch: 0 m - 900 m) Re-excavation of Khan bari hota Khal (Ch: 0 m - 700 m) Ref lined Section (13nos.) and SP Signboard (2nos.) SSSWRDP babuganj   6.00 96 56.01 LCS 56.01 19/11/2020 18/01/2021 30/04/2021 100 54.20 96 30/11/2022 Completed
544 SP62051/BaherChar Khudrakathi Subproject Re-excavation of Amtalir Khal (Ch. 0+000 to Ch. 1+630 km) Re-excavation of Moragangir Khal (Ch. 0+000 to Ch. 2+350 km). Re-excavation of Madartola Khal (Ch. 0+000 to Ch. 1+300 km). Re-excavation of Sadhukathi Khal (Ch. 0+000 to Ch. 1+200m). Re-excavation of Sadhukathi Br. Khal (Ch. 0+000 to Ch. 0+300m). Const. of 7 Nos. Ref. lined Section on 5 Khals, SP Identf. sign board 2 Nos., Demercation Post 12 Nos. and SP Indication Post 2 Nos. Const. of Culvert (2V-4.0m X 4.0m) on Moragangir Khal Const. of WMCA office (12.0mx6.0m) SSSWRDP babuganj   6.78 82 164.06 M/S S H Enterprise 159.14 27/03/2023 30/03/2023 31/05/2023 82 131.15 82 30/11/2022 Ongoing
545 SP62052/Rakudia Subproject Re-excavation of Bangla Kata Khal (Ch. 0+000 to Ch. 1+460 km) Re-excavation of Kalir Bazar Khal (Ch. 0+000 to Ch. 0+400 km). Re-excavation of Mominuddir Khal (Ch. 0+000 to Ch. 0+705 km) Re-excavation of Mominuddir Br. Khal (Ch. 0+000 to Ch. 0+732 km). Re-excavation of Narayan Dasher Khal (Ch. 0+000 to Ch. 0+595m) Re-excavation of Nurdir Khal (Ch. 0+000 to Ch. 1+866m) Re-excavation of Rakudia Sluice Gate Khal (Ch. 0+000 to Ch. 1+625m) Re-excavation of Yasiner Khal (Ch. 0+000 to Ch. 0+880m) Const. of 11 Nos. Reference lined Section on 8 Khals, SP Identf. sign board 2 Nos., Demercation Post 48 Nos. and SP Indication Post 2 Nos. Const. of WMCA office (12.00mx6.00m) SSSWRDP babuganj   8.26 82 131.09 M/S S H Enterprise 128.74 27/03/2023 27/04/2023 31/05/2023 90 105.72 82 30/11/2022 Ongoing
546 SP24133/Padrishibpur Subproject Mollar Danga Branch Khal Re-excavation(ch0.00-2200m) Sundor Khali Khal Re-excavation(ch0.00-1900m) Andar Manik Khal Re-excavation(ch0.00-1320m) Sundor Khali Brach Khal Re-excavation(ch0.00-525m) Referenced Line Section(10nos), Subproject Identification signboard (2nos.) Construction of WMCA Building (Semi pacca) SSSWRDP bakerganj   5.94 94 81.12 LCS 79.03 25/03/2020 21/01/2021 30/04/2021 100 74.63 94 30/11/2022 Completed
547 SP61024/Boalia Bakhorkathi Subproject Re-excavation of Sonamukhi Khal (Ch-1+000km to 1+530km) Re-excavation of Jugibari Khal (Ch-1+000km to 1+500km) Re-excavation of Napitbari Khal (Ch-0+000km to 1+772km) Ref. Lined Section 2 Nos. On 3 Khals, And SP Identf. Signboard 2 Nos. Construction of Sonamukhi Khal Regulator (1V-1.50m X1.80m) at Ch. 0+145km of Khal Construction of Jugibari Khal Regulator (1V-1.50m X 1.80m) at Ch. 0+215km of Khal Construction of Napitbari Khal Regulator (1V-1.50 m X 1.50m) at Ch.0+450Km of Khal Construction of WMCA office SSSWRDP bakerganj   2.80 72 237.85 M/S Mohiuddin Ahmed 216.27 07/03/2022 21/07/2022 30/04/2023 82 157.16 72 30/11/2022 Ongoing
548 SP14123/Niamati FCD Subproject Rehabilitation of Niamati Khal Regulator at ch.310m Embankment Rehabilitation of Matiadubi Khal Regulator at ch.5800m Embankment Rehabilitation of Tengrakhali Khal Regulator at ch.6300m Embankment Rehabilitation of Samaddar Khal Regulator at ch.36600m Embankment. SSSWRDP bakerganj   0.00 0 32.29 OTM 29.06 05/11/2023 16/01/2024 15/07/2024 0 0.00 0 30/11/2022 Ongoing
549 SP15294/Kabai FCD Subproject Kathalbari Khal re-xcavation (Ch:0.00m - 1250m) Hariram Khal re-xcavation (Ch:0.00m - 5930m) Kabai Embankment re-sectioning(ch: 9.720 - 11170m) Const. of 09 Nos. Ref. lined Section on 02 Khals, SP Identf. sign board 2, SP Area Indication Post 2 Nos. SSSWRDP bakerganj   8.63 45 74.76 LCS 74.81 14/03/2024 24/04/2024 31/05/2024 62 33.97 45 30/11/2022 Ongoing
550 SP44097/Dudhal Subproject Beg Barir Khal re-excavation (Ch:0.00-1500m) Jele Barir Khal re-excavation (Ch:0.00-1100m) Gani Hawladar Barir Khal re-excavation (Ch:0.00-500m) Hawladar Barir Khal re-excavation (Ch:0.00-370m) Const. of 04 Nos. Ref. lined Section on 4 Khals, SP Identf. sign board 2, SP Indication Post 2 Nos. Dudhal Embankment re-sectioning (Ch:0.00 - 3750m) 2020-23 SSSWRDP bakerganj   7.22 62 79.42 LCS 79.42 13/11/2023 03/04/2024 30/04/2024 96 49.48 62 30/11/2022 Ongoing
551 SP22020/Kachua Subproject Re-excavation of Baishari khal (Ch: 0.00 - 2540 m) Re-excavation of Kachua khal (Ch: 0.00 - 1320 m) Re-excavation of Kachua Branch khal (Ch: 0.00 - 500 m) Re-excavation of Sabuj Biplob khal (Ch: 0.00 - 1670 m) and Provisional Sum. Reference Lined Section (7 nos.) and SP Identification Signboard (2 nos.) Construction of WMCA Building (Semi pacca) SSSWRDP banaripara   6.03 93 83.45 LCS omor ali 80.80 16/02/2020 21/01/2021 30/04/2020 100 75.34 93 30/11/2022 Completed
552 SP22041/Jambudwip Subproject Re-excavation of Machrang Khal (Ch: 0.00 - 2230 m) Re-excavation of Rajjakpur Khal (Ch: 0.00 - 2180 m) Re-excavation of NapitBarir Khal (Ch: 0.00 - 1330 m) Re-excavation of Union Parishad Khal (Ch: 0.00 - 750 m) and Provisional Sum. Reference Lined Section (10 nos.) and SP Identification Signboard (2 nos.) Construction of WMCA Office (Semi pacca) SSSWRDP banaripara   6.49 94 79.69 LCS SOROYAR HOSSEN 76.94 09/03/2020 21/01/2021 31/12/2020 100 72.50 94 30/11/2022 Ongoing
553 SP44125/Chakhar Subproject Re-exacavation of Chakhar Bazar khal (Ch-0+00km to 2+950km) Re-exacavation of Pashchim Chakhar Khal (Ch-0+000km to 1+00km) Re-exacavation of Chakhar College khal (Ch-0+000km to 0+580km) Re-exacavation of Doctor Barir khal (Ch-0+000km to 0+350km) Re-exacavation of U P khal (Ch-0+000km to 0+400km) Ref. Lined Section 08 Nos. On 5 Khals, And SP Identf. Signboard (2 nos.) Construction of WMCA office building SSSWRDP banaripara   5.28 41 64.10 S H Enterprise 63.61 25/01/2022 10/02/2022 30/04/2022 83 26.17 41 30/11/2022 Ongoing
554 SP61002/Char Icha Subproject Re-excavation of Mora Nadi (Ch. 2+200Km to 5+850Km) Re-excavation of Mukshiganjer Khal (Ch. 0+000Km to 2+670Km) Re-excavation of Chand Kati Khal (Ch. 0+000Km to 0+570Km) Re-excavation of Char Icha Varanir Khal (Ch. 0+000Km to 1+030Km) Re-excavation of Jiler Khal (Ch. 0+000Km to 2+100Km) Re-excavation of Jiler Branch-1 Khal (Ch. 0+000Km to 0+660Km) Re-excavation of Jiler Branch-2 Khal (Ch. 0+000Km to 1+475Km) Re-excavation of Karna Kati Khal (Ch. 0+900Km to 2+160Km) Construction of Reference Lined sections ( 14 Nos. ), Provisional Sum Construction of Bamboo bridge (14 Nos. ), Sub-Project Identification Signboard Construction of WMCA Building (Semi pacca) SSSWRDP barishal-s   13.41 91 152.52 S H Enterprise 150.39 06/08/2020 19/06/2022 30/04/2022 100 138.34 91 30/11/2022 Completed
555 SP44111/Kasipur Subproject Tulatala Khal re-excavation (Ch:0.00 - 1950m) Sharshi Khal re-excavation (Ch:0.00 - 1600m) Sharshi Branch Khal re-excavation (Ch:0.00 - 1170m) Magorpara Khal re-excavation (Ch:0.00 - 1330m) Const. of 09 Nos. Ref. lined Section on 4 Khals, SP Identf. sign board 2, SP Area Indication Post 2 Nos. SSSWRDP barishal-s   6.05 34 54.35 LCS 54.35 17/01/2024 16/03/2024 30/04/2024 50 18.62 34 30/11/2022 Ongoing
556 SP62056/Tungi Baria Subproject Memania Khal Re-Excavation from Ch. 0+900km to Ch. 7+168km with 1 Nos Fish Sanctury Ch.9m 1+700km) Kumar Barir Khal Re-Excavation from Ch. 0+200km to Ch. 4+038km Kanai Pura Khal Re-Excavation from Ch. 0+000km to Ch. 0+761km Const. of 13 Nos. Ref. lined Section on 03 Khals, SP Identf. sign board 2, SP Area Indication Post 2 Nos. Const. of WMCA office SSSWRDP barishal-s   10.86 0 128.69 OTM 128.69 01/01/1900 0 0.00 0 30/11/2022 Ongoing
557 SP15306/Mahilara FCD Subproject Lebutoli khal re-excavation(ch.00-3500m) Mahilara embankment re-sectioning(ch.6600-10900m) Referenced line section(4 Nos.) Bamboo Bridge(3 Nos.) Sharifabad Khal re-xcavation (Ch:0.00m - 2450m) 2023-24 Char Diyashur Khal re-xcavation (Ch:0.00m - 1600m) 2023-24 Ramzanpur Khal re-xcavation (Ch:0.00m - 1950m) 2023-24 Ramzanpur Branch Khal re-xcavation (Ch:0.00m - 800m) 2023-24 Const. of 04 Nos. Ref. lined Section on 04 Khals, SP Identf. sign board 2, SP Area Indication Post 2 Nos. | 2023-24 Construction of WMCA Office SSSWRDP gouranadi   14.60 64 185.72 Sorowar Sarder 185.71 19/03/2019 31/03/2019 30/04/2024 50 120.17 64 30/11/2022 Ongoing
558 SP15307/Sarikal FCD Subproject Char sarikal khal re-excavation(ch.00-1600m) Maddha Hasnabad khal re-excavation(ch.00-1400m) Patur khal re-excavation(ch.00-1600m) Referenced line section(5 Nos.) Bamboo bridge(3 Nos.) Embankment re-sectioning(ch.00-1200m) WMCA office & Irrigation Canal Hasnabad Khal re-xcavation (Ch:2500.00m - 3300.00m) 2023-24 Nalgura AB Khal re-xcavation (Ch:0.00m - 4500.00m) 2023-24 Const. of 07 Nos. Ref. lined Section on 02 Khals, SP Identf. sign board 2, SP Area Indication Post 2 Nos. | 2023-24 SSSWRDP gouranadi   11.10 79 173.44 OTM 175.09 16/10/2018 20/11/2018 30/04/2024 92 140.06 79 30/11/2022 Ongoing
559 SP15308/Nalchira FCD Subproject Gorangal khal re-excavation(ch.00-6200m) Referenced line section(6 Nos.) Bamboo bridge (6 Nos.) WMCA Office SSSWRDP gouranadi   6.20 92 130.66 M/S Mega Ripa Enterprise 131.70 16/10/2018 14/07/2019 30/04/2019 100 121.62 92 30/11/2022 Completed
560 SP61006/Hosnabad Subproject Re-exacavation of Kurir Char Khal (Ch-0+000km to 3+300km) Re-exacavation of Paschim Kurir Char Khal (Ch 0+000km to 3+310km) Re-exacavation of Miar Char khal (Ch-0+800km to 3+000km) Re-exacavation of Miar Char Branch khal (Ch 0+000km to 1+900km) Construction of 10 Nos. Reference Lined sections and SP idenf. SB 2 No. Construction of WMCA office building. SSSWRDP gouranadi   10.71 95 151.71 Mother Engineering 152.83 19/12/2022 17/05/2022 30/04/2022 100 146.45 95 30/11/2022 Completed
561 SP13040/Chilmari FCD Subproject Naktir Khal Re-excavation (Ch: 0 - 1700 m) Beparir Khal Re-excavation (Ch: 0 - 1800 m) Khal Bunia Khal Re-excavation (Ch: 0 - 1300 m) Chilmari Embankment Re-sectioning(1500m) Refferenced line section (6 Nos.) WMCA Office and Others SSSWRDP mehendiganj   6.30 96 114.49 salma akter 112.42 24/02/2019 07/08/2019 30/04/2019 100 108.68 96 30/11/2022 Completed
562 SP14171/Khajuria FCD Subproject Char khajuria khal re-excavation(ch.00-2600m) Tulatoli khal re-excavation(ch.00-2300m) Majer khal re-excavation(ch.00-1700m) Referenced line section(6 Nos.) Bamboo bridge(1 Nos.) Embankment re-sectioning(ch.00-3200m) WMCA Office SSSWRDP mehendiganj   9.80 96 142.45 selim 141.79 27/09/2018 22/11/2018 30/04/2019 100 136.92 96 30/11/2022 Completed
563 SP61017/Kazirhat Subproject Re-Sectioning of Kazirhat Embankment (ch.0+000km to 3+600km) Re-excavation of Kazirhat Khal (Ch-1+000km to 2+400km) Re-excavation of Kazirhat Branch-1 Khal (Ch-0+000km to 1+850km) Re-excavation of Kazirhat Branch-2 Khal (Ch-0+000km to 1+500km) Re-excavation of Kazirhat Branch-3 Khal (Ch-0+200km to 1+825km) Re-excavation of Kazirhat Branch-4 Khal (Ch-0+000km to 1+585km) Re-excavation of Kataltali khal (Ch-2+800km to 4+620km) Re-excavation of Kataltali Branch khal (Ch-0+000km to 0+600km) Re-excavation of Masjid bari khal (Ch-0+000km to 2+175km) (Ch-0+000km to 0+600km) Re-excavation of Munshi bari khal (Ch-0+000km to 0+600km) Ref. Lined Section 16 Nos. On 9 Khals And SP Identf. Signboard (2 nos.) Construction of WMCA office building SSSWRDP mehendiganj   16.75 94 136.54 S H Enterprise 134.56 26/12/2022 28/04/2022 30/04/2022 100 127.49 94 30/11/2022 Completed
564 SP44136/Paschim Cheyam Takta Shayem Takta Khal re-xcavation (Ch:0.00m - 2130m) Paschim Shayem Takta Khal re-xcavation (Ch:0.00m - 2200m) Jahir Uddin Khal re-xcavation (Ch:0.00m - 1930m) Const. of 09Nos. Ref. lined Section on 03 Khals, SP Identf. sign board 2, SP Area Indication Post 2 Nos. SSSWRDP mehendiganj   6.26 0 49.99 LCS 49.99 01/01/1900 0 0.00 0 30/11/2022 Ongoing
565 SP13073/Kazir Char DR Subproject Construction of WMCA Building (Semi pacca). Re-excavation of Boroier khal-1 (Ch: 0.00 - 1130 m) Re-excavation of Boroier khal-2 (Ch: 0.00 - 1050 m) Re-excavation of Pangashia branch khal (Ch: 0.00 - 1130 m) Re-excavation of Haolader barir branch khal (Ch: 0.00 - 1600 m) Reference lined section (9nos.) and Subproject Identification signboard (2nos.) SSSWRDP muladi   4.91 66 88.56 LCS sowkat hossen 86.42 05/02/2020 21/01/2021 30/04/2020 83 57.13 66 30/11/2022 Ongoing
566 SP14196/Toyka FCD Subproject Re-excavation of Purba silimpur khal (Ch. 0.00 - 1620 m) Re-excavation of Sajir khal (Ch. 0.00 - 500 m) Re-sectioning of Toika embankment (Ch. 5900 - 9000 m) Refence lined section (4nos.) and SP identification Signboard (2nos.) SSSWRDP muladi   5.22 96 73.69 LCS tofajjel hossen 73.69 13/01/2020 12/02/2020 30/04/2020 100 71.28 96 30/11/2022 Completed
567 SP15274/Sreemoti FCD Subproject Re-excavation of Goloi Bhanga Khal (Ch 0 - 5150m) Re-excavation of Chardumuri tola Khal (Ch 0 - 1375m) Reference line section (3 nos.) Basher Shako (7 nos.) SSSWRDP muladi   6.52 94 56.48 yasmin begum 56.48 03/02/2019 04/03/2019 30/04/2019 100 53.59 94 30/11/2022 Completed
568 SP25313/Char Batamara & Shafipur Subproject Re-excavation of Boalia khal (Ch. 0.00 - 4600 m) Re-excavation of Boalia branch khal (Ch. 0.00 - 900 m) Reference Lined Section (7nos.), Bamboo bridge (4nos.), SP Signboard (2nos.) Maintenance of office. SSSWRDP muladi   5.50 91 88.61 md.siddikul 88.61 10/12/2020 12/02/2020 30/04/2020 100 81.16 91 30/11/2022 Completed
569 SP62049/Kurir Char Miar Char Subproject Re-excavation of Kadamtalar Khal (Ch. 0+100 to Ch. 2+410 km) Re-excavation of Khokon Master Bari Khal (Ch. 0+000 to Ch. 1+300 km). Re-excavation of Mostofa Bari Khal (Ch. 0+000 to Ch. 0+780 km) Re-excavation of Natachora Khal (Ch. 0+000 to Ch. 1+652m) Re-excavation of Natachora Br.1 Khal (Ch. 0+000 to Ch. 0+400m) Re-excavation of Natachora Br.2 Khal (Ch. 0+000 to Ch. 0+400m) Const. of 07 Nos Reference lined Section 6 Khals, SP Identf. sign board 2 Nos., Demercation Post 22 Nos. and SP Indication Post 2 Nos. Const. of Culvert (2V-4.0m X 4.0m) on Kadamtalar khal Const. of WMCA office (12.0mx6.0m) SSSWRDP muladi   6.84 97 161.30 M/S Amir Engineering Corporation 156.48 27/03/2023 29/03/2023 31/05/2023 100 152.20 97 30/11/2022 Completed
570 051/176 Construction of kobai UP Complex UCCP-2 bakerganj 100 98.89 93.94 09/07/2014 30/12/2015 100 92.57 100 31/08/2020 final
571 050/176 Construction of muladi UP Complex UCCP-2 bakerganj 100 90.91 79.72 17/05/2016 23/02/2017 100 78.98 100 31/08/2020 final
572 w.510 Construction of DUDHOL UP Complex UCCP-2 bakerganj 100 109.45 98.50 09/08/2017 08/05/2018 100 98.33 100 10/08/2020 final
573 w-507 Construction of FARIDPUR UP Complex UCCP-2 bakerganj 100 107.85 97.07 09/08/2017 08/05/2018 100 96.97 100 09/08/2020 final
574 070/246 Cons. of durgapasa up UCCP-2 bakerganj 100 79.89 80.53 17/12/2009 28/06/2010 100 80.42 100 10/07/2020 revised & final
575 (70/246) Construction of DURGAPASA UP Complex UCCP-2 bakerganj 100 79.89 80.53 17/12/2009 23/12/2009 28/06/2010 100 80.42 100 15/04/2015 Completed
576 Kobai Kobai UCCP-2 bakerganj 0 98.89 93.94 09/07/2014 15/07/2014 50 0.00 0 15/04/2015
577 w.254 Construction of banaripara UP Complex UCCP-2 banaripara 100 86.94 86.91 11/09/2014 14/06/2016 100 86.91 100 10/08/2020 final
578 Banaripara Banaripara UCCP-2 banaripara 0 86.94 86.91 11/09/2014 16/11/2014 85 0.00 0 15/04/2015
579 069/246 Cons. of jagua up UCCP-2 barishal-s 100 81.00 97.11 25/04/2011 30/05/2016 100 96.54 100 10/07/2020 Cons. of Remakri up
580 w.245 Construction of mahilara UP Complex UCCP-2 gouranadi 100 92.62 87.99 03/09/2013 31/12/2015 100 87.99 100 10/08/2020 final
581 Mahilara Mahilara UCCP-2 gouranadi 92.62 87.99 03/09/2013 08/09/2013 50 6.00 15/04/2015
582 w.480 Construction of dulkhola UP Complex UCCP-2 hizla 100 132.76 132.55 01/06/2017 13/03/2018 100 132.55 100 10/08/2020 final
583 w.425 Construction of gaurbodi UP Complex UCCP-2 hizla 100 116.45 122.28 16/04/2014 15/01/2016 100 122.14 100 10/08/2020 final
584 Gourobdi Gourobdi UCCP-2 hizla 116.45 122.28 16/04/2014 21/04/2014 75 15/04/2015
585 W.334 Construction of 3 no CHARAKKORIA UP Complex UCCP-2 mehendiganj 100 114.98 123.95 26/06/2014 16/09/2015 100 121.18 100 12/08/2020 final
586 w.210 Construction of 11 no chanpur UP Complex UCCP-2 mehendiganj 100 129.99 105.01 31/01/2016 30/06/2017 100 103.34 100 10/08/2020 final
587 3No Charakkoria 3No Charakkoria UCCP-2 mehendiganj 114.98 123.95 26/06/2014 30/06/2014 80 15/04/2015
588 w.375 Construction of SAFIPUR UP Complex UCCP-2 muladi 100 90.91 86.36 25/11/2013 29/02/2016 100 89.38 100 13/08/2020 final
589 Safipur Safipur UCCP-2 muladi 90.91 86.36 25/11/2013 30/11/2013 70 3.00 15/04/2015
590 W.321 Construction of 7 no bamrail UP Complex UCCP-2 uzirpur 100 87.79 87.79 24/06/2013 30/11/2016 100 100.00 100 13/08/2020 final
591 w.497 Construction of satla UP Complex UCCP-2 uzirpur 100 106.18 95.56 24/06/2018 04/02/2019 100 95.56 100 13/08/2020 final
592 CBU-100/ Purto-200 বরিশাল জেলার বাবুগঞ্জ উপজেলাধীন বীরশ্রেষ্ঠ জাহাঙ্গীরনগর ইউনিয়নের অর্ন্তগত বাবুগঞ্জ জিসি রাস্তার পার্শ্বে ০.০০মিটার চেইনেজে লাশঘাটা খালের উপর ব্রিজ নির্মাণ (রোড আইডিঃ ৫০৬০৩৫০১১) UHBP babuganj 506035011 50.00 0 540.48 M/S. Progoti Enterprise, Dasherjangal, Gohairhat, Shariatpur. 438.95 18/05/2021 25/05/2021 31/12/2024 35 146.03 0 28/06/2024  
593 CBU-100/ Purto-201 বরিশাল জেলার বাবুগঞ্জ উপজেলাধীন বাবুগঞ্জহাট - আগরপুরহাট সড়কে ১৯৮৮মিটার চেইনেজে ব্রিজ নির্মাণ (রোড আইডিঃ ৫০৬০৩২০০২) UHBP babuganj 506032002 28.00 0 402.42 Barendra Construction Ltd. 362.18 15/07/2024 22/07/2024 21/07/2025 0 0.00 0 28/06/2024  
594 CBU-100/ Purto-198 বরিশাল জেলার বাকেরগঞ্জ উপজেলাধীন দক্ষিণ কানকি কিঞ্চাকাঠি জিপিএস এবং উওর কানকি বাজার সড়কে শ্রীমন্থা নদীর উপর ব্রিজ নির্মাণ (রোড আইডিঃ ৫০৬০৭৫১১৯) UHBP bakerganj 506075119 72.00 0 975.91 M/S. Hazi Enterprise, Bakergonj, Barisal. 865.42 05/05/2021 11/05/2021 26/07/2023 45 380.00 0 28/06/2024  
595 CBU-100/ Purto-194 বরিশাল জেলার বানরীপাড়া উপজেলাধীন উদয়কাটি ইউপিসি ভায়া গঙ্গামনি জিপিএস - মুরারবাড়ী ত্রিমুখি হাট সড়কে ০০ মিটার চেইনেজে হাশির খালের উপর RCC ব্রিজ নির্মাণ। (রোড আইডিঃ ৫০৬১০৩০১২) UHBP banaripara 506103012 60.00 0 758.33 M/S. Kohinoor Enterprise, Dadpur Lodge, Barishal 818.31 25/10/2020 02/11/2020 15/07/2022 100 817.84 0 28/06/2024  
596 CBU-100/ Purto-195 বরিশাল জেলার বানরীপাড়া উপজেলাধীন দক্ষিণ নাজিরপুর হতে মহিষাপোতা আবাসন ভায়া বানারীপাড়া লঞ্চঘাট সড়কে ১২৩৫ মিটার চেইনেজে RCC ব্রিজ নির্মাণ। (রোড আইডিঃ ৫০৬১০৩৪০৮৪) UHBP banaripara 5061034084 45.00 0 350.90 M/S. Islam Brothers Ltd-M/S. Meem & Co (JV), 42-43, Shiddeshwari Circular Road(4th Floor, Dhaka-1217. 343.26 17/05/2021 24/05/2021 05/12/2022 100 342.92 0 28/06/2024  
597 CBU-100/ Purto-404 বরিশাল জেলার বানারীপাড়া উপজেলাধীন দক্ষিণ নাজিরপুর হাইস্কুল ভায়া বানারীপাড়া লঞ্চঘাট-মহিশাপোতা আবাস সড়কে ৯২মিটার চেইনেজে (রোড আইডি-৫০৬১০৪০৮৪) সেতু নির্মাণ। UHBP banaripara 506104084 99.00 0 1198.51 Mohammed Eunus & Brothers(Pvt.) Ltd 1078.66 10/01/2023 17/01/2023 16/07/2024 45 333.94 0 28/06/2024  
598 CBU-100/ Purto-405 বরিশাল জেলার বানারীপাড়া উপজেলাধীন মধুরভিটা স্কুল হতে মোল্লাবাড়ী বাজার ভায়া তেললা মাঝির বাড়ী মাদ্রাসা সড়কে ৩০০মিটার চেইনেজে সেতু নির্মাণ (রোড আইডি-৫০৬১০৫০৫০)। UHBP banaripara 506105050 52.00 0 782.99 EFTE-Poly (JV) 40, West Tejturi Bazar, Tejgaon, Dhaka. 702.99 19/06/2022 26/06/2022 23/10/2024 95 522.12 0 28/06/2024  
599 CBU-100/ Purto-468 Access Road to the Bridge Construction of 60.00m Long RCC Girder Bridge On Udaykati UPC via Gongamoni GPS-Murarbari Trimukhi hat road ar Ch. 00m. (Road ID: 506103012) Under Banaripara Upazila, District: Barishal. UHBP banaripara 506103012 0.40 0.00 0 511.79 M/S. Sifat Enterprise 460.61 02/08/2023 08/08/2024 08/08/2024 69 316.25 0 28/06/2024  
600 CBU-100/ Purto-403 বরিশাল জেলার গৌরনদী উপজেলাধীন বিথি বাজার (এনএইচডব্লিও) হতে ভুরগাথা বাস-ষ্টেন (এনএইচডব্লিও) ভায়া আমানটাগঞ্জ হাট সড়কে ৮০০মিটার চেইনেজে সেতু নির্মাণ (রোড আইডি-৫০৬৩২২০১৭)। UHBP gouranadi 506322017 24.00 0 345.84 M/S. Kohinoor Enterprise 380.21 25/08/2022 02/09/2022 10/02/2023 0 0.00 0 28/06/2024  
601 CBU-100/ Purto-199 বরিশাল জেলার হিজলা উপজেলাধীন হোসনাবাদ মেমানিয়া ইউপি হতে ডিগ্রীরচর বাজার ভায়া খাগেরচর আশ্রায়ন রাস্তায় তেনাছিড়া ব্রিজ নির্মাণ (রোড আইডিঃ ৫০৬৩৫৩০১২) UHBP hizla 506353012 60.00 0 704.07 M/S. Progoti Enterprise, Dasherjangal, Gohairhat, Shariatpur. 572.05 12/08/2021 19/08/2021 30/12/2023 40 203.00 0 28/06/2024  
602 CBU-100/ Purto-203 বরিশাল জেলার মেহেন্দিগঞ্জ উপজেলাধীন শায়েস্তাবাদ জিসি(বরিশাল সদর)-হিজলা উপজেলা হেড কোয়ার্টার ভায়া গাজীরহাট, কাজীরহাট জিসি মিয়ারহাট এবং একতারহাট (একতার রাস্তার ব্রিজ) ২৪১৫০মিটার চেইনেজে (রোড আইডিঃ ৫০৬৬২২০০৮) সেতু নির্মাণ। UHBP mehendiganj 506624080 60.00 0 657.01 Md. Mahfug khan Ltd & M/S. Layla Builders(JV) 511.49 18/11/2021 25/11/2021 30/05/2024 35 148.35 0 28/06/2024  
603 CBU-100/ Purto-402 বরিশাল জেলার উজিরপুর উপজেলাধীন যোগীরকান্দা গালা বাজার-ওয়েষ্ট সাইড খেয়াঘাট-ওয়েষ্ট সাইড পাকা সড়কে ০.০০মিটার চেইনেজে সেতু নির্মাণ (রোড আইডি-৫০৬৯৪৫২৯৬)। UHBP uzirpur 506945296 96.00 0 1292.22 M/S. Kohinoor Enterprise Dadpur Lodge, Barishal. 1259.92 29/06/2022 06/07/2022 23/10/2024 45 520.80 0 28/06/2024  
604 UIIP-BC/PCO/W-520 A) Construction of Shed for Public Transport Passenger (28.00sqm) Beside R&H Road Connecting point on Bus stand at ward No.01 Under Bakerganj Pourashava. B) Construction of One Storied Public Toilet (Type A=56.00sqm) Beside R&H Road & Jelkhana Khal at ward No.02 Under Bakerganj Pourashava. UIIP bakerganj 87 47.11 M/S Enterprise 51.51 12/09/2022 19/09/2022 11/09/2023 97 44.94 87 07/10/2024
605 UIIP-BC/PCO/W-551 A)       Construction of RCC Road from Sadar road to Betagi Road (Ch: 0.00-62.00m) Under R&H Bridge at ward No.-02, Under Bakerganj Paurashava. B) Construction of RCC road from Aga baker road to Bongobondhu Road (Ch:0.00-156.00m) Under R&H bridge Bank of Srimonto River at ward No.-08, Under Bakerganj Paurashava. C) Construction of RCC road from Sahebganj road to Sabujbag road west side of twin quarter (Ch: 0.00 -157.00m & Link 7m+7m=14m, Total Length=171m) at ward no 05, Under Bakerganj Paurashava D) Construction of Rustum ali road by RCC from R&H road to T&T road, Ch:0.00-122.00m at ward No.- 04, Under Bakerganj Paurashava E) Construction of RCC road from aga baker khan link road to aga baker khan road west side of Pourashava road (Ch:0.00-119.00m) at ward no. 04, Under Bakerganj Paurashava Construction of RCC road from Talukder bari road to Mollik bari road (Brave Freedom Fighter Abdus Sobhan Mallik Road) (Maim Road Ch: 0.00-120.00m & Link-01=20m, Link-02=80m, Link-03=15m) at ward no 09, Under Bakerganj Paurashva G) Construction of aga baker khan Main Road by RCC (Ch:0.00-51.00=51m) from T&T Road to R&H road at ward No. 04, Under Bakerganj Paurashava. (Dropped) UIIP bakerganj 0.88 85 145.86 M/S Enterprise 143.47 03/06/2023 03/07/2023 02/06/2024 100 122.18 85 07/10/2024
606 UIIP/PCO/G-34 Implementation & Supply 765 nos Waste Basket (120 ltr) & 10 nos Non-motorized vehicle (van) under Bakerganj Pourashava District: Barishal. UIIP bakerganj 39.97 RFL Plastrics Limited 27.60 10 07/10/2024
607 UIIP-BC/PCO/W-123 Construction of R.C.C. road from Bakerganj Betagi road to Baroi Bari Bridge infront of B.I.P. Colony.Ward No-01.Under Bakerganj Pourashava.Ch00.00-885.00m. Estimate for Construction of B.C road from Shahebganj road to Shahebganj West Side of Tween Quarter. Ch157-257.00 m100.00 m. Ward no-05.Under Bakerganj Pourashava UIIP bakerganj   0.99 0.00 100 91.15 M/S Muhib Construction 91.14 06/10/2020 15/10/2021 100 91.01 100 29/09/2022 0.01% Less
608 UIIP-BC/PCO/W-124 Construction of B.C road from Ruhiterpar R & H to Padma Dighi via Fiha Bricks.Ward No-06. Under Bakerganj Pourashava.Ch 00m - 682m. construction of BC road from R & H road to Hasan Mekar house. Ward No-01. Under Bakerganj Pourashava. Ch00m to ch320 m. UIIP bakerganj   1.00 0.00 99 90.17 M/S T M Enterprise 90.17 04/10/2020 15/10/2022 100 89.01 99 29/09/2022 As Per
609 UIIP-BC/PCO/W-125 Estimate for RCC road of Post Office road to Varani Khal.LGED Approch and Hospital Ch00m-310m and Post Office road to LGED Bridge Approch towards North- East Ch00-240 m.Ward No-05. Under Bakerganj Pourashava. Estimate for Construction of R.C.C road from Bakerganj Betagi road to B.I.P road North Side of Miraz House.Ch 00m to 362 m. Ward No-01.Under Bakerganj Pourashava. UIIP bakerganj   0.60 0.00 100 109.23 M/S Muhib Construction 109.22 04/10/2020 15/10/2021 100 109.14 100 29/09/2022 0.01% Less
610 UIIP-BC/PCO/W-126 Construction of R.C.C road from Sree dhanto bariroad to Atharogasiagami road via Nagor Mollah house.Ward No-0809. Under Bakerganj Pourashava.Ch 00 m- 885 m UIIP bakerganj   0.89 0.00 100 99.93 M/S Muhib Construction 99.93 06/10/2020 15/10/2021 100 99.91 100 29/09/2022 As Per
611 UIIP-BC/PCO/W-159 Construction of RCC Drain left side of B.I.P Road from Bakerganj Betagi road to Khalifa Bari Khal ChOO.OOm to 510m.Ward No-O1.Under Bakerganj Pourashava and Agabaker Road to High School Road ChOO.OOm to 60m.Ward no- 04Under Bakerganj Pourahava. UIIP bakerganj   0.00 100 89.11 S/M Enterprise 89.00 01/11/2020 08/11/2020 30/10/2021 100 88.94 100 29/09/2022 0.047% less
612 UIIP-BC/PCO/W-160 Construction of RCC Road from Akon Bari Road to Talukder Bari Road. Ch0.00-590.00m590.00m and Link Akon 3ari Mosque Ch 0.00-90.00 m. Total Length 680m Ward no- 09.Under Bakerganj Pourashava. UIIP bakerganj   0.68 0.00 100 84.68 S/M Enterprise 84.68 01/11/2020 08/11/2020 30/10/2021 100 84.66 100 29/09/2022 As Per
613 UIIP-BC/PCO/W-161 A Construction of RCC Road from Bakerganj Betagi Road to Runshi varry Road West side of Kundo Bari towards North ChO.OO-480m480m Ward No-01. Under Bakerganj Pourashava B Construction of RCC Road from Bakerganj Betagi Road to Runshi varry Road infront of Kalarn Councilor house toward west ChO.OO-165m165m. Ward no 01. Under Bakerganj Pourashava C Construction of Graveyard Road by RCC Ch 199-326 m. At ward No 07.Under Bakerganj Pourashava. UIIP bakerganj   0.77 0.00 100 95.37 M/S Muhib Construction 95.31 01/11/2020 08/11/2020 30/10/2021 100 94.45 100 29/09/2022 0.063% Less
614 UIIP-BC/PCO/W-291 A Construction of RCC Road from high School road to Primary School and JSU High School.Bakerganj Pourashava.Ward No-04. Under Bakerganj Pourashava B Construction of RCC Road fromR & H road to M. Rahman Sarok. North side of Muzahidia Madrasha Ward No- 02. Under Bakerganj Pourashava. ChOOm-266m266m. C Construction of RCC Road from Sadar road to Ripon Councilors house. Ward No-02. Under Bakerganj Pourashava. ChOOm-244m.D Construction of RCC Road from Sadar road to Tulatoli River & house of ton Chakraborti twowards West. Ward No- 02. Under Bakerganj Pourashava. ChOOm 153m .Link30m UIIP bakerganj   1.03 0.00 86 121.91 S/M Enterprise 121.86 01/08/2021 01/08/2021 31/07/2022 100 104.79 86 29/09/2022 0.048% Less
615 UIIP-BC/PCO/W-292 A. Construction of RCC Drain from West side of Rony house to R and H ditch Ward 0 I. Under Bakerganj Pourashava. ChO.00-153.00m 153.00m. B. Construction of RCC Drain from Skin Mridha shop to Thana more Chourasta existing RCC Drain Ch 00-98.00m D I from West side of Skin Mridha shop to Tulatoli River. Ch 00-122.00m D2 from Skin Mridha house to proposed D2 drain Ch 00-92m92m D3.At ward No-03. Under Bakerganj Pourashava C. Construction of RCC Drain from Emdad Khandoker house to R and Khal. At Ward No-07. Under Bakerganj Pourashava.ChOO- 107m. D. Construction of RCC Drain from Md. Kalarn house to Sreemonto river East side of Madrasha Road and West side of Girls School at ward No-05. Under Bakerganj Pourashava. D I ChOO-285m. D2 ChOO-60m. UIIP bakerganj   0.00 82 136.59 M/S Muhib Construction 139.35 01/08/2021 01/08/2021 31/07/2022 100 114.05 82 29/09/2022 2.024% Above
616 UIIP-BC/PCO/W-293 A construction of Single Vent RCC 3.00 x 3.00 Box Culvert in khal from R H road to North Azimpur Kshashem Mazi Bari Road. Ward No-07. Under Bakerganj Pourashava B. construction of Single Vent RCC 2.00x2.00 Box Culvert In khal side of Runshi road to West side of Kalam Councilors house. Ward No-O1. Under Bakerganj Pourashava C. construction of Single Vent RCC 2.00x2.00Box Culvert in Varani Khal West side of Bari market. Ward No-OS. Under BakerganjPourashava D. construction of Single Vent RCC 2.00x2.00Box Culvert in Khal Padma Dighivarry road . Ward No-06. Under Bakerganj Pourashava. E. construction of Single Vent RCC 2.00x2.00 Box Culvert in Khal Runshiivarry road to Shampurgami road in front of Unus Hawladers house Ward No-01. Under Bakerganj Pourashava. F construction of Single Vent RCC 2.00x2.00 Box Culvert in Khal Ruhiter par road towards South in front of Akkas Gazi House Ward No-09. Under Bakerganj Pourashava. UIIP bakerganj   13.00 95 76.70 M/S Jamal Sarder 76.68 01/08/2021 01/08/2021 31/07/2022 100 72.87 95 29/09/2022 0.028% Less
617 UIIP-BC/PCO/W-136 (A) Improvement of road from Torki Omor Roy House Bridge to Profullo Chokroborti House Ch 0.00m to 775m by Bituminous Dense Carpeting DC Gournadi Pourashava District Barishal. (B) Rehabilitation of BC road from Torki High School to Kali Khola ch 0.00m to 450m by Bituminous Dense Carpeting DC with Three U-Drain Under Gournadi Pourashava District Barishal. (C) Improvement of road from Sundardi Abdul Mozid Pre-Cadet School to Md. Alomgir Shikder house Ch 0.00m to 558m by Bituminous Dense Carpeting DC Gournadi Pourashava District Barishal. (D) Rehabilitation of BC road from Torki Bandor Goat Market to Anondopur Bridge Ch 0.00m to1328m by Bituminous Dense Carpeting DC Gournadi Pourashava District Barishal. UIIP gouranadi 3.11 0.00 100 161.73 M/S Howleder enterprise 155.88 27/10/2020 03/11/2020 30/06/2022 100 155.71 100 07/10/2024
618 UIIP-BC/PCO/W-233 (a) Improvement of road from Tikashar Khan Bari Mosque to Upazila Dormetory (Ch 0.00m to 391m) by Bituminous Dense Carpeting (DC), Gournadi Pourashava, District : Barishal. (b) Repairing of BC road from Gournadi Upazila Gate to Gournadi Bazar via Azad Professor House (Ch 0.00m to 673m) by Bituminous Dense Carpeting (DC), Gournadi Pourashava, District : Barishal. (c) Rehabilitation of BC road from Upazilla Public Health Office to Dewan Bari (Ch 0.00m to 240m) by Bituminous Dense Carpeting (DC), Gournadi Pourashava, District : Barishal. (e) Rehabilitation of BC road from Hizoltala Paik Bari road to Bokultala road (Ch 0.00m to 318m) by Bituminous Dense Carpeting (DC), Gournadi Pourashava, District : Barishal UIIP gouranadi 1.50 0.00 100 158.69 M/S Howleder Enterprise 70.27 24/11/2020 01/12/2020 30/06/2022 100 70.27 100 07/10/2024
619 UIIP-BC/PCO/W-491 A) Improvement of road from Madbor Bari Jame-Mosque to Bangla Bazar road (Ch: 0.00m to 518m) by Bituminous Dense Carpeting (DC) with three U-Drain at Ch:100m 196m 350m of Gournadi Pourashava District : Barishal. B) Rehabilitation of BC road South Bijoypur Mamun Furniture to R&H road (Ch: 0.00m to 566m) by Bituminous Dense Carpeting (DC) Gournadi Pourashava District : Barishal. C) Construction of RCC road from Food Godown to Fish Market Bridge (Ch: 0.00m to 135m) Under Gournadi Pourashava District: Barishal D) Repairing of BC road from Gournadi Thanar More to ASP Office Via Rob CEO House (Ch: 0.00m to 330m) by Bituminus Dense Carpeting (DC) Under Gournadi Pourashava District: Barishal UIIP gouranadi 1.55 0.00 100 91.59 M/S Howleder enterprise 91.58 23/05/2022 30/05/2022 22/05/2023 100 90.02 100 07/10/2024 0.01% Less
620 UIIP-BC/PCO/W-492 A) Repairing of BC road from Diasur Joshim Shop to Banglabazer road (Ch: 0.00m to 766m) by Bituminus Dense Carpeting (DC) Under Gournadi Pourashava District: Barishal B) Repairing of BC road from Gerakul Govt. Primary School to Dulal Khan Shop (Ch: 0.00m to 1160.00m) by Bituminus Dense Carpeting (DC) and Three U-drain at Ch. 296m 533m 722m ward No.08 Under Gournadi Pourashava District: Barishal C) Construction of RCC road from Diasur kobiraj House to Alamin Howlader House(Ch: 0.00m to 190m) via Shohid Gazi House (Ch: 176.00m to 236m) Under Gournadi Pourashava District: Barishal D) Construction and Installing Palisading for road side development at Pourashava road Tikasar Mintu Howlader House adjacent Pond (201m) by Masonry Brick work and Pre-Cast RCC Post Palisading ward No.05 under Gournadi Pourashava District : Barishal. UIIP gouranadi 2.28 0.00 100 115.13 M/S Howleder enterprise 115.11 23/05/2022 30/05/2022 22/05/2023 100 114.63 100 07/10/2024 0.015% Less
621 UIIP-BC/PCO/W-493 A (i) Construciton of RCC Drain from Gournadi-Sarikal GC road North Side of Khan Shoping to via Bhuiya Store to Birendash store to Gournadi river (Ch: 0.00-195m D1) (ii) Ice factory to Shathi Garments (Ch: 0.00-95m D2) (iii) Birendash Store to Sochin Gosh Sweet factory near cannel (Ch: 0.00-95 D3) (iv) Shathi Garments to front of Registry Office (Ch: 0.00-85m D4) (v) Bhuiya Store to Gournadi Cannel ( Ch: 0.00-35m D5) Ward No. 05 Under Gournadi Pourashava Dist: Barishal. B(i) Construciton of RCC Drain Torki Bandor Liton khan store to near by Sheraz Member shop cannel (Ch: 0.00-275m D1) (ii) Torki Bandor High School gate to Fish Market South Corner (Ch: 0.00-155m D2) (iii) Bagdad Hotel near by pond to south side of fish market Main drain (Ch: 0.00-100 D3) (iv) Torki Bandor Mosque to South side main drain (Ch: 0.00-60 D4) at ward No. 01 Under Gournadi Pourashava Dist: Barishal. C (i) Construciton of RCC Drain from Gournadi - Sorikal GC road North side Karim Professor House to Chargadhatali Baitul Noor Mosque (Ch: 0.00-230m D1) (ii) Banker Akbar House to Baitul Noor Masque Main Drain (Ch: 0.00-120m D2) (iii) Baizid Akon House to Ekram Professor House near main Drain (Ch: 4.00-36m D3) (iv) X-Drain Near By Ekram Professor House (Ch: 0.00-04m) Ward No. 05 Under Gournadi Pourashava Dist: Barishal. UIIP gouranadi 0.00 94 231.90 M/S Howleder enterprise 231.90 06/06/2022 09/06/2022 31/08/2024 98 218.51 94 07/10/2024 0.001% Less
622 UIIP-BC/PCO/W-494 A) Construction of Single Vent (2.00x2.00m) RCC Box Culvert at Ashokati-Gerakul Road infront of Paik Bari Ward No.08 Under Gournadi Pourashava Dist: Barishal. B) Construction of Single Vent (2.00x2.60m) RCC Box Culvert at Torkir Char Kashir Mistir Dokan Ward No.02 Under Gournadi Pourashava Dist: Barishal. C) Construction of Single Vent (4.30x4.30m) RCC Box Culvert Over Khal at Torki Vozon Kundu Oil Mil Ward No.02 Under Gournadi Pourashava Dist: Barishal. D) Construction of Single Vent (3.00x3.00m) RCC Box Culvert Over Cannel infront of Torki Omor Roy House Ward No.01 Under Gournadi Pourashava Dist: Barishal. E) Construction of Single Vent (1.30x1.30m) RCC Box Culvert Over Cannel infront of Diashur Chowkider House Road Ward No.08 Under Gournadi Pourashava Dist: Barishal. UIIP gouranadi 14.76 100 85.00 M/S Howleder enterprise 84.98 06/06/2022 09/06/2022 05/06/2023 100 83.86 100 07/10/2024
623 UIIP-BC/PCO/W-518 A) Construction of One Storied Public Toilet (Type A=56.00sqm) at ward No.06 Under Gournadi Pourashava, Dist: Barishal B)Construction of Shed for Public Transport Passenger (28.00sqm) at ward No.06 Under Gournadi Pourashava, Dist: Barishal. UIIP gouranadi 0.00 100 49.90 M/S Howleder enterprise 49.89 03/07/2022 10/07/2022 29/02/2024 100 48.80 100 07/10/2024
624 UIIP-BC/PCO/W-553 A) Improvement of Road from Goat Market Road to Torki Bondor Mutual Trust Bank via Torki High School (Ch. 22.00 to 280.00m) by RCC with a Cross Drain at Ward no. 01, under Gournadi Pourashava, Barishal. B) Improvement of Road from Sawra Shahjahan Howlader House to Sawra Govt. Primary School (Ch 0.00m to 146m) by RCC and One Road cross Drain at Ch.3.00m, Ward No. 06, Gournadi Pourashava, District : Barishal. C) Improvement of BC Road from Hizoltala Paik Bari to Bokultala Road (Ch:174-318m) by Bituminous Dense Carpeting (DC) at Ward No:06 under Gournadi Pourashava, District: Barishal UIIP gouranadi 0.54 85 75.88 M/S Howleder enterprise 75.86 28/05/2023 28/05/2023 27/05/2024 99 216.31 85 07/10/2024
625 UIIP/PCO/G-35 Implementation & Supply 602 nos Waste Basket (120 ltr) & 20 nos Non-motorized vehicle (van) under Gournadi Pourashava District: Barishal. UIIP gouranadi 0 39.98 RFL Plastrics Limited 29.99 03/04/2024 03/04/2024 02/07/2024 0 0.00 0 07/10/2024
626 UIIP-BC/PCO/W-137 (A) Improvement of road from Boro Kasba R&H to West side of Allah Mosque via Ex-Counsilor Alebali House Ch 0.00m to 480m by Bituminous Dense Carpeting DC with One U-Drain Gournadi Pourashava District Barishal. (B) Rehabilitation of BC road from Torki Cow Hat to Firoz Howlader House Tin Kona Via Sazol Kazi Counsilor House ch 0.00m to 825m by Bituminous Dense Carpeting DC Under Gournadi Pourashava District Barishal.(C) Improvement of road from Gournadi Goinaghata Bridge to Gournadi Bondar Katcha Bazar via Abdur rob Serniabad Hostel Ch 0.00m to 930m by Bituminous Dense Carpeting DC with Four U-Drain Gournadi Pourashava District Barishal. UIIP gouranadi   2.24 0.00 0 149.30 M/S Howleder Enterprise 149.28 27/10/2020 03/11/2020 30/06/2022 100 0.00 0 29/09/2022 0.01% Less, Recast done (Time Extended)
627 UIIP-BC/PCO/W-234 (a) Improvement of road from Ashokathi Bazar to Rasel Councilor House (Ch 0.00m to 510m) by Bituminous Dense Carpeting (DC), Gournadi Pourashava, District : Barishal (b) Repairing of BC road from Ashokathi Kacha Bazar to Gerakul Joshim's Shop (Ch 0.00m to 1470m) by Bituminous Dense Carpeting (DC), Gournadi Pourashava, District : Barisha (c) Rehabilitation of BC road from Ashokathi Filling Station to Gerakul Govt. Primary School (Ch 0.00m to 1315m) by Bituminous Dense Carpeting (DC), Gournadi Pourashava, District : Barishal UIIP gouranadi   3.30 0.00 52 128.15 M/S Howleder Enterprise 127.67 24/11/2020 01/12/2020 30/06/2022 100 66.14 52 29/09/2022 0.02% Less, Recast done Progress is less for the Scheme No. (b) & (c) due to negligence of the assigned Contractor
628 UIIP-BC/PCO/W-416 A) Construction of RCC Road Starting from Bosar Howlader House To Kazi Kamal House Ch. 0.00-350 m.Ward No.09.Under Muladi Pourashava District Barishal. B) Construction of RCC Road Starting from Arif Shop To Praimary School Ch. 0.00-385m.Ward No.06 Under Muladi Pourashava District. Barishal. UIIP muladi 0.74 0.00 100 123.61 M/S. DEIP ENTERPRISE 123.32 17/01/2022 23/01/2022 16/01/2023 100 123.30 100 10/10/2024 0.23% Less
629 UIIP-BC/PCO/W-555 (A) Improvement of RCC Road from Boro Mosque Delwar Shop To Graveyard (Ch. 0.00-105 m) at ward no. 06 Under Muladi Pourashova District. Barishal. (B) Improvement of RCC Road from Main Road To H/O Ketab Ali Bapary/Jakir Bapary (Ch. 0.00-160 m) at ward No.02.Under Muladi Pourashava District Barishal. (C) Improvement of RCC Road from Main Road Shah Alam Kha House To Habib Sikder (Paner Bor) (Ch. 0.00-305m) at ward No.03.Under Muladi Pourashava District Barishal. (D) Improvement of RCC Road from Main Road To H/O Khalek Kha To Masud Mollah (Ch. 0.00-100m) ward No.04.Under Muladi Pourashava District Barishal. (E) Improvement of RCC Road from CMB To Ajom Bapary & Bappy House (Ch. 0.00-320m) at ward No.07.Under Muladi Pourashava District Barishal. (F) Improvement of RCC Road from Main Road To H/O Shipu Kha (Ch. 0.00-250 m) at ward No.02.Under Muladi Pourashava District Barishal. UIIP muladi 1.29 100 206.23 AKA-PC (JV) 214.56 06/06/2023 12/06/2023 05/06/2024 100 214.09 100 10/10/2024
630 UIIP/PCO/G-36 Implementation & Supply 439 nos Waste Basket (120 ltr) & 30 nos Non-motorized vehicle (van) under Muladi Pourashava District: Barishal. UIIP muladi 0 39.98 RFL Plastrics Limited 0.00 0 0.00 0 08/10/2024
631 UIIP-BC/PCO/W-115 01.Construction of RCC Road in CMB Road To Poura Border.In Ward No.07.Under Muladi.Pourashava.Ch.000-0892m 02.Construction of RCC Road in Siklone Centre To Stadium.In Ward No.04.Under Muladi Pourashava.Ch.000-0450m. UIIP muladi   1.34 0.00 100 119.40 M/S Rupali Construction 124.16 09/08/2020 12/08/2021 100 124.09 100 29/09/2022 3.98% above, Revised done
632 UIIP-BC/PCO/W-116 01.Construction of RCC Road in Launch Ghat To Brick Field Via Mosque In Ward No.05.Under Muladi Pourashava.Ch.000-0780m. 02.Construction of RCC Road in GP Tower To CMB Road Via Sopon House In Ward No.07.Under Muladi.Pourashava.Ch.000-0450m. UIIP muladi   1.23 0.00 100 112.74 M/S Rupali Construction 112.51 08/09/2020 13/08/2020 12/08/2020 100 112.47 100 29/09/2022 0.20% Less
633 UIIP-BC/PCO/W-231 01.Construction Of Rcc Road In East Side of Taltola Bajar To Anwar Shikder House.In Ward No.08.Under Muladi Pourashava.Ch.000-0813.(Salvage Tk=196102.00) 02.Construction of RCC Road in Main Road To Atik House House.In Ward No.02.Under Muladi Pourashava.Ch.000-0450m.(Salvage Tk=129515.00) UIIP muladi   1.26 0.00 100 120.25 M/S KHAN ABDUS SABUR 120.00 30/11/2020 07/12/2020 06/12/2021 100 119.88 100 29/09/2022 0.21% Less
634 UIIP-BC/PCO/W-232 01.Construction of RCC Road in Mollah Bazar Bridge To Rastar Matha End Of The River Via Vranir Khal.In Ward No.03.Under Muladi.Pourashava.Ch.000-0820m. 02.Construction of RCC Road in Boroi Tola To Salam mal House Via Sardar Bari.In Ward No.07.Under Muladi Pourashava.Ch.000-0645m. UIIP muladi   1.47 0.00 100 135.56 M/S KHAN ABDUS SABUR 135.22 30/11/2020 07/12/2020 06/12/2020 100 135.18 100 29/09/2022 0.25% Less
635 UIIP-BC/PCO/W-415 A.Construction Of Rcc Road starting from Mira Bari Mosque To Bapary bari House End of River. Ward No.06.Under Muladi Pourashava.Ch.0+00-0+410m.l. B.Rehabilitation Of BC Road Strarting from Terochar Madrasha To Farid Howlader House Ch. 0.00-560m.by Bituminous Dense Carpeting.Ward No.02 Under Muladi Pourashava District. Barisha UIIP muladi   0.97 0.00 100 98.44 M/S KHAN ABDUS SABUR 98.28 17/01/2022 23/01/2022 16/01/2023 100 98.24 100 29/09/2022 0.17% :Less
636 UIIP-BC/PCO/W-417 A) Construction Of RCC Drain starting from Mithur Bari Culvert To Canel Ward No-04 Under Muladi Pourashava.Ch.0.00-306m B) Construction Of RCC Drain starting from Poura Kitchen Market To Kheya Ghat Ward No-06 Under Muladi Pourashava Ch.0.00-400m UIIP muladi   0.00 100 123.10 m/s Khan Abdus Sabur 122.92 07/12/2021 14/12/2021 06/12/2022 100 122.87 100 29/09/2022 0.14% Less
637 UIIP-BC/PCO/W-418 Construction Of RCC Drain starting from Dhali Market To East Bajar Ward No-06 Under Muladi Pourashava. Ch.0.00-336m UIIP muladi   0.00 100 58.60 M/S. DEIP ENTERPRISE 58.23 07/12/2021 14/12/2021 06/12/2022 100 58.21 100 29/09/2022 0.63% Less
638 UIIP-BC/PCO/W-419 A) Constructin Of 1-Vent 4.00 X4.00m Rcc Box Culvert on Mira Bari Canel.In Ward No.06.Under Muladi Pourashava B) Constructin Of 1-Vent 4.00 X4.00m Rcc Box Culvert on Akkas Howlader Canel Ward No.06 Under Muladi Pourashava C) Constructin Of 1-Vent 3.00 X3.00m Rcc Box Culvert on Monosagong Ghat Canel Ward No.01 Under Muladi Pourashava D) Constructin Of 1-Vent 4.00 X4.00m Rcc Box Culvert on Babul Sardar House Canel Ward No. 08 Under Muladi Pourashava UIIP muladi   15.00 100 88.72 M/S Al Mamun Entr. 88.57 07/12/2021 14/12/2021 06/12/2022 100 88.55 100 29/09/2022 0.17% Less
639 UTMIDP- AGAI/ BARI/ WD-6 Constructionof U-Drain Culvert and Internal Drain Road on Muktijhodda Complex- Upazila H/Q.Hellepad via Livestock Office. UTMIDP agailjhara 0.13 0 13.56 M/S Mother Engineering 14.17 23/07/2019 30/10/2019 0 0.00 0 30/07/2019