1
|
BDIRWSP/BAR/BAK/DW-12
|
Widening & Strengthening of Bakergonj-Gobindopur Hat. [From RHD Bakerganj-Gobindopur via Rabipur, Shialguni, Kakorda, Vathshala Kalisuri road at Ch. 5590-17248m including 05 Nos. 4.00mx4.00m RCC Box Culvert at 6562m, 7933m, 9041m, 15050m & 16158m under Bakerganj Upazila, District-Barishal. Road ID No: 506072002. Salvage Materials Cost Tk. 4846796.00
|
BDIRWSP
|
bakerganj
|
506072002
|
11.66
|
|
|
2417.06
|
EFTE.ETCL (PVT.) LIMITED-M/S. Amir Engineering Corporation (JV), Horinpala, Bhandaria, Pirojpur & College Row, Barisal, Bangladesh
|
2175.35
|
|
|
|
0
|
|
|
18/11/2024
|
|
2
|
BDIRWSP/BAR/BAN/DW-01
|
Widening & Strengthening of Chowmohona GC via Biserkandi, Umarerper, Baitakghata, Wazedia- RHD (Baisari) road at Ch. 6407-15746m and RCC Road-100m (Ch. 12614-12714m wazidia bazar) including 01 No. 1-vent 4.00mx4.00m RCC Box Culvert at ch. 15634m and 03 Nos. 1.00mx1.00m RCC Box Culvert at ch. 7480m, 10878m & 13274m and 01 No. Double vent 4.00mx4.00m RCC Box Culvert at ch. 15739m under Banaripara Upazila, District-Barishal. Road ID No: 506102001. Salvage Materials Cost Tk. 20504124.00
|
BDIRWSP
|
banaripara
|
506102001
|
9.34
|
|
|
2518.42
|
M/S. Kohinoor Enterprise Dadpur Lodge, Kawnia 1st Lane, Barishal Sadar, Barishal
|
2266.58
|
|
|
|
0
|
|
|
11/11/2024
|
|
3
|
BDIRWSP/BAR/BAN/DW-02
|
Widening & Strengthening of (Danduat) RHD via Bangla Bazar, Aower Hat.-Harta GC road at Ch. 0.00-5000m including 01 No. 1.00mx1.00m RCC Box Culvert at ch. 1008m and 02 Nos. 2.00mx2.00m RCC Box Culvert at ch. 1338m & 7734m and 03 Nos. 1-vent 3.00mx3.00m RCC Box Culvert at ch. 757m, 1700m & 4830m and 01 No. 1-vent 4.00mx4.00m RCC Box Culvert at ch. 2350m under Banaripara Upazila, District-Barishal. Road ID No: 506102003. Salvage Materials Cost Tk. 6024928.00
|
BDIRWSP
|
banaripara
|
506102003
|
5.00
|
|
|
1741.92
|
M/S. Kohinoor Enterprise Dadpur Lodge, Kawnia 1st Lane, Barishal Sadar, Barishal
|
1567.73
|
|
|
|
0
|
|
|
11/11/2024
|
|
4
|
BDIRWSP/BAR/SAD/DW-13
|
Widening & Strengthening of Charkawa Karnokati to Ranirhat via Napter hat , Char Aicha Poler hat road at Ch. 3941 - 8036m & 180m RCC Road including 02 Nos. 2.00m x 2.00m RCC Box Culvert at Ch. 4135m & 4357m under Sadar Upazila, District : Barishal. [Salvage Materials Cost Tk. 1008277] [Road ID No. 506512005].
|
BDIRWSP
|
barishal-s
|
506512005
|
4.95
|
|
|
770.35
|
M/S Dhara Enterprise-MS Upakul ConstructionJV, Baptist Mission Road, Barisal
|
693.32
|
|
|
|
0
|
|
|
18/11/2024
|
|
5
|
BDIRWSP/BAR/SAD/DW-14
|
Part 1 : Construction for the vertical Extension of Office Building of Additional Chief Engineer, Barishal Division, LGED, Barishal. Part 2 : Construction for the vertical Extension of Office Building cum Dormitory Bhaban of Executive Engineer, LGED, Barishal. [Package No : BDIRWSP/BAR/SAD/DW- 14]
|
BDIRWSP
|
barishal-s
|
|
|
|
|
1094.45
|
M/S. Amir Engineering Corporation, College Row, Barisal, Bangladesh
|
1070.04
|
|
|
|
0
|
|
|
18/11/2024
|
|
6
|
BDIRWSP/BAR/MEH/DW-08
|
Widening & Strengthening of Shaestabad GC (Barisal Sadar)- Hizla Upzila HQ Via Gazirhat, Kazirhat GC, Miarhat & Ekkoterhat road at Ch. 10000-14700m and 150m RCC Road (Gabtoli Bazar portion Ch. 12273-12423m) under Mehendiganj Upazila, District-barishal. Road ID No: 506622008. Salvage Materials Cost Tk. 1846750.00
|
BDIRWSP
|
mehendiganj
|
506622008
|
4.70
|
|
|
977.70
|
M/S. Kohinoor Enterprise, Dadpur Lodge, Kawnia 1st Lane, Barishal Sadar, Barishal
|
879.93
|
|
|
|
0
|
|
|
18/11/2024
|
|
7
|
BDIRWSP/BAR/MEH/DW-09
|
Widening & Strengthening of Ulania GC-Aliganj GC Road (Mehendigonj part) road at Ch. 0.00-3000m including 01 No. 4.00mx4.00m RCC Box Culvert at 2412m under Mehendiganj Upazila, District-barishal. Road ID No: 506622007. Salvage Materials Cost Tk. 6468993.00
|
BDIRWSP
|
mehendiganj
|
506622007
|
3.00
|
|
|
892.96
|
M/S. Amir Engineering Corporation College Row, Barisal, Bangladesh
|
803.67
|
|
|
|
0
|
|
|
11/11/2024
|
|
8
|
BDIRWSP/BAR/MEH/DW-10
|
Widening & Strengthening of Ulania GC-Aliganj GC Road (Mehendigonj part) road at Ch. 3000-5600m including 03 No. 2.00mx2.00m RCC Box Culvert at3155m, 3922m & 4655m under Mehendiganj Upazila, District-barishal. Road ID No: 506622007. Salvage Materials Cost Tk. 4948400.00
|
BDIRWSP
|
mehendiganj
|
506622007
|
2.60
|
|
|
787.12
|
M/S. Amir Engineering Corporation College Row, Barisal, Bangladesh
|
757.99
|
|
|
|
0
|
|
|
11/11/2024
|
|
9
|
BDIRWSP/BAR/MEH/DW-06
|
Widening & Strengthening of Shaestabad GC (Barisal Sadar)- Hizla Upzila HQ Via Gazirhat, Kazirhat GC, Miarhat & Ekkoterhat road at Ch. 300-5200m and 235m RCC Road (Dafader Bazar portion Ch. 3150-3385m & 50m RCC Road (Banghata Bazar portion Ch. 5150-5200m) including 01 No. 2.00mx2.00m RCC Box Culvert at 668m under Mehendiganj Upazila, District-barishal. Road ID No: 506622008. Salvage Materials Cost Tk. 1908322.00
|
BDIRWSP
|
mehendiganj
|
506622008
|
2.20
|
|
|
1083.61
|
M/S. Kohinoor Enterprise, Dadpur Lodge, Kawnia 1st Lane, Barishal Sadar, Barishal
|
975.25
|
|
|
|
0
|
|
|
11/11/2024
|
|
10
|
BDIRWSP/BAR/MEH/DW-07
|
Widening & Strengthening of Shaestabad GC (Barisal Sadar)- Hizla Upzila HQ Via Gazirhat, Kazirhat GC, Miarhat & Ekkoterhat road at Ch. 5200-10000m and 100m RCC Road (Banghata Bazar portion Ch. 5200-5300m) under Mehendiganj Upazila, District-barishal. Road ID No: 506622008. Salvage Materials Cost Tk. 1865023.00
|
BDIRWSP
|
mehendiganj
|
506622008
|
4.80
|
|
|
943.31
|
M/S. Kohinoor Enterprise, Dadpur Lodge, Kawnia 1st Lane, Barishal Sadar, Barishal
|
848.98
|
|
|
|
0
|
|
|
11/11/2024
|
|
11
|
BDIRWSP/BAR/MUL/DW-11
|
Widening & Strengthening of Muladi GC- Talukder Hat- Bashtala Bazar- Mirdar Hat upto Muladi Boarder road at Ch. 5640-9840m including 03 Nos. Double Vent- 4.00mx4.00m RCC Box Culvert at 7200m, 8250m & 9120m and 02 Nos. Single Vent- 3.00mx3.00m RCC Box Culvert at 5700m & 6700m and 01 No. Single Vent- 4.00mx4.00m RCC Box Culvert at 6000m under Muladi Upazila, District-barishal. Road ID No: 506692001. Salvage Materials Cost Tk. 1055990.00
|
BDIRWSP
|
muladi
|
506692001
|
4.20
|
|
|
1111.48
|
Mohammed Eunus & Brothers (Pvt.) Ltd. Fortune Mall (7th Fl.), Baizid Bostami Road, Nasirabad, Panchlaish, Chattogram
|
1000.33
|
|
|
|
0
|
|
|
18/11/2024
|
|
12
|
BDIRWSP/BAR/UZI/DW-03
|
Widening & Strengthening of Sanuhar R& H -Dhamura GC- Jalla- Satla GC Road at Ch. 0.00-8000m including 06 Nos. 0.900mx0.900m Drainage Culvert at Ch. 735m, 1210m, 3080m, 5800m, 6581m & 7950m and 01 No. 2.00mx2.00m RCC Box Culvert at Ch. 6764m under Uzirpur Upazila, District-Barishal. Road ID No: 506942003. Salvage Materials Cost Tk. 3040750.00
|
BDIRWSP
|
uzirpur
|
506942003
|
8.00
|
|
|
1764.44
|
EFTE.ETCL (PVT.) LIMITED Horinpala, Bhandaria, Pirojpur
|
1588.00
|
|
|
|
0
|
|
|
11/11/2024
|
|
13
|
BDIRWSP/BAR/UZI/DW-04
|
Widening & Strengthening of Sanuhar R& H -Dhamura GC- Jalla- Satla GC Road at Ch. 8000-15000m under Uzirpur Upazila, District-Barishal. Road ID No: 506942003. Salvage Materials Cost Tk. 2324241.00
|
BDIRWSP
|
uzirpur
|
506942003
|
7.00
|
|
|
1498.43
|
EFTE.ETCL (PVT.) LIMITED Horinpala, Bhandaria, Pirojpur
|
1348.59
|
|
|
|
0
|
|
|
11/11/2024
|
|
14
|
BDIRWSP/BAR/UZI/DW-05
|
Widening & Strengthening of Sanuhar R& H -Dhamura GC- Jalla- Satla GC Road at Ch. 15000-22965m under Uzirpur Upazila, District-Barishal. Road ID No: 506942003. Salvage Materials Cost Tk. 1897465.00
|
BDIRWSP
|
uzirpur
|
506942003
|
7.97
|
|
|
1884.66
|
M. M. Builders & Engineers Ltd-M/S. Amir Engineering Corporation (JV)
|
1696.19
|
|
|
|
0
|
|
|
11/11/2024
|
|
15
|
BDRIDP/BAR/AGL/CCA-Rd/02
|
Improvement of Road from Seral-Goila road viaShahid Serniabad House- Tamer Jame Mosjid (Tamer Girls High School - Seral Community Center by BC From Ch. 0.0m-975m under Agailjhara Upazila,Barisal.
|
BDRIDP
|
agailjhara
|
|
0.98
|
|
|
55.27
|
M/S Mitushi Traders
|
45.84
|
|
|
|
100
|
|
|
08/04/2019
|
|
16
|
BDRIDP/BAR/AGL/CCA-Rd/08
|
Improvement of road from Hazi Mokbul Sardar House via Sardar Mohabubul Alom & Sardar Harun - Jainger Gomosta House road. at Ch.00 to 208m under Agailjhara Upazila Barisal.
|
BDRIDP
|
agailjhara
|
|
0.21
|
|
|
21.68
|
M/S Sharif Enterprise
|
22.77
|
|
22/03/2018
|
22/09/2018
|
100
|
|
|
08/04/2019
|
|
17
|
BDRIDP/BAR/AGL/Gha/01
|
Construction of Ghat at Paisarhat Paschim par under Agailjhara Upazila Barisal
|
BDRIDP
|
agailjhara
|
|
|
|
|
29.00
|
M/S Sharif Enterprise
|
29.58
|
|
29/03/2018
|
29/09/2018
|
60
|
|
|
08/04/2019
|
|
18
|
BDRIDP/BAR/AGL/UZ-RdR/03
|
Maintenance of Barthi- Valiukshi-Magura Bakal Hat Roada Earthwark from Ch. 9860- 11860m.b Carpeting DC 21.3 sqm.c 12mm SC-5237.7 sqm. d Palisading Work 103.00m. Under Agailjhara Upazila District- Barishal.
|
BDRIDP
|
agailjhara
|
506022008
|
|
|
|
1265178.00
|
|
0.00
|
|
|
|
0
|
|
|
08/04/2019
|
|
19
|
BDRIDP/BAR/AGL/ UZ-RdR/04
|
Maintenance of Road From Nimtola RHD-Dhamura GC viaRatnapur UP Road at Ch 5265m-7383m Agailjhara Under Agailjhara Upazila District- Barishal.
|
BDRIDP
|
agailjhara
|
506022010
|
|
|
|
2249883.00
|
|
0.00
|
|
|
|
0
|
|
|
08/04/2019
|
|
20
|
BDRIDP/BAR/AGL/UN-RdR/03
|
Maintenance of Road From Goila UP Office to Billogram Bazar via Rajer Bari Road at Ch 00m-2000mm Agailjhara Under Agailjhara Upazila District- Barishal.
|
BDRIDP
|
agailjhara
|
506023008
|
|
|
|
2890888.00
|
|
0.00
|
|
|
|
0
|
|
|
08/04/2019
|
|
21
|
BDRIDP/BAR/AGL/UN-RdR/02
|
Maintenance of Road From Basail Hat Rajihar UP-Batra Bazar viiiia Basail Pachchim Para Bazar Road at Ch 00m-1000m Agailjhara Under Agailjhara Upazila District - Barishal.
|
BDRIDP
|
agailjhara
|
506023006
|
|
|
|
3511387.00
|
|
0.00
|
|
|
|
0
|
|
|
08/04/2019
|
|
22
|
BDRIDP/ BAR/AGL/ CCA-Rd/09
|
A Improvement of Temar Bastaila Nagar GPS-West Mollapara-Ohchiarmad Bazar. i Earthwark Ch.650m-1865m.ii Carpeting DC Ch. 650m-1865m. iii Palsading 641m.B Choto Basail Kander Bepari House to East Valukshi Bridge.Salvaged Cost Tk 37835.00i Earthwark Ch.0.00m-360m.ii Carpeting DC Ch.0.00m-360m. iii Palsading 120m. Under Agailjhara upazila District Barishal.
|
BDRIDP
|
agailjhara
|
"506024009 506025045 "
|
|
|
|
15112800.00
|
|
0.00
|
|
|
|
0
|
|
|
08/04/2019
|
|
23
|
BDRIDP/BAR /AGL/CCA-Rd/01
|
Improvement of Road by BC from Rathkhola Bazar-Bhadrapara Road (ch. 0m-1000m) Under Agailjhara Upazila, District-Barisal.
|
BDRIDP
|
agailjhara
|
|
1.00
|
|
|
50.98
|
M/S Talukder Enterprise
|
56.00
|
|
30/10/2014
|
30/04/2015
|
100
|
|
|
|
|
24
|
BDRIDP/BAR/AGL/CCA-Rd(R)/06
|
Rehabilitation of road from Temar Bastala to Hawla bridge via Nagar GPS-Talbazar-Oichermath bazar road by BC from Ch. 3840m-4840m with 3 Nos U-Drain at Ch. 4410m, 4590m & 4740m.
|
BDRIDP
|
agailjhara
|
|
1.00
|
|
|
49.14
|
M/S Sharif Enterprise
|
51.58
|
|
29/04/2015
|
28/01/2016
|
100
|
|
|
|
|
25
|
BDRIDP/BAR/AGL/CCA-St/01
|
Construction of road from 2 vent 4.00m×4.00m RCC Box Culvert on Ashkor Puraton Kalibari Baily Bridge to Kishore Bissas's house road at Ch. 841m with Dranage Culvert at Ch. 930m.
|
BDRIDP
|
agailjhara
|
|
|
|
|
16.78
|
M/S Sharif Enterprise
|
17.72
|
|
|
|
100
|
|
|
|
|
26
|
BDRIDP/BAR/AGL/UN-Rd(R)/01
|
Rehabilitation of road from Goila (DR) to Teimukhi via Bakal hat & Kodaldhoa bazar road by BC form Ch. 11192m-13954m.
|
BDRIDP
|
agailjhara
|
|
2.76
|
|
|
147.39
|
M/S Sharif Enterprise
|
155.93
|
|
|
30/05/2015
|
100
|
|
|
|
|
27
|
BDRIDP/BAR/AGL/UZ-Rd/02
|
Improvement of road from Paisharhat GC to Shatla GC via Bagdha GC road by BC from Ch. 3800m-5800m.
|
BDRIDP
|
agailjhara
|
|
2.00
|
|
|
107.71
|
M/S Sraboni Construction
|
112.88
|
|
|
|
100
|
|
|
|
|
28
|
BDRIDP/BAR/AGL/CCA-Rd/03
|
Improvement of road from Boro Magra Sluice to Ramshil Bazar via Kodaldhoa road by BC from Ch. 0.00m-1000m with on Boromagra Stuice to Ramshil Bazar via Dodaldhoa road from Ch. 280m
|
BDRIDP
|
agailjhara
|
|
1.00
|
|
|
60.17
|
M/S Sarniabad Enterprise
|
63.76
|
|
|
|
100
|
|
|
|
|
29
|
BDRIDP/BAR/AGL/CCA-Rd/04
|
Improvement of road from Poiser hat GC-Ramshil Bazar via Trimukhi road by BC from Ch. 0.00m-1000m.
|
BDRIDP
|
agailjhara
|
|
1.00
|
|
|
49.26
|
M/S Shafique Brothers
|
55.39
|
|
28/05/2015
|
28/11/2015
|
100
|
|
|
|
|
30
|
BDRIDP/BAR/AGL/CCA-Rd(R)/05
|
Rehabilitation of road from Ashkor Puraton Kalibari Baily Bridge to Kishore Bissas's house road from Ch. 0.00m-1200m.
|
BDRIDP
|
agailjhara
|
|
1.20
|
|
|
41.59
|
M/S Helal Traders
|
44.00
|
|
|
|
100
|
|
|
|
|
31
|
BDRIDP/BAR/AGL/UZ-Rd(R)/01
|
Rehabilitation of Barthi - Valukshi - Magura- Ambari-Bakalhat road by BC at ch.5870-7880m.
|
BDRIDP
|
agailjhara
|
|
2.01
|
|
|
127.47
|
M/S Santu Traders
|
133.83
|
|
15/07/2015
|
14/07/2016
|
100
|
|
|
|
|
32
|
BDRIDP/BAR/AGL/CCA-Rd/07
|
Improvement of road from Biplob Serniabad House to Hazi Musa House road By BC from ch.00-400m.
|
BDRIDP
|
agailjhara
|
|
0.40
|
|
|
19.17
|
M/S Serniabad Enterprise
|
20.13
|
|
|
|
100
|
|
|
|
|
33
|
BDRIDP/BAR/AGL/CCA-Rd/ 02
|
Improvement of road from Seral - Goila road via Shahid Serniabad House - Tamer Jame Mosjid(Tamer Girls High School-Seral Community Center) by BC (Ch.0.0 - 975m) under Agailjhara Upazila,Barisal.
|
BDRIDP
|
agailjhara
|
|
0.98
|
|
|
72.33
|
M/S Serniabad Traders
|
72.30
|
|
16/03/2017
|
16/10/2017
|
100
|
|
|
|
|
34
|
BDRIDP/BAR/AGL/CCA-EW/01
|
Resectioning of Road from Seral-Goila road via Shahid Serniabad House-Tamer Jame Mosjid (Tamer Girls High School-Seral Community Center) by Earth at Ch. 0.00m-975m.
|
BDRIDP
|
agailjhara
|
|
0.98
|
|
|
3.18
|
Md. Babul Sikder
|
3.18
|
|
30/03/2017
|
30/04/2017
|
100
|
|
|
|
|
35
|
BDRIDP/BAR/AGL/CCA-EW/02
|
Improvement of road from Ashkor Puraton Kalibari Baily Bridge to Kishore Bissas’s House by Earth work from Ch. 00-1200m under Agailjhara Upazila, Barisal.
|
BDRIDP
|
agailjhara
|
|
1.20
|
|
|
4.49
|
Abdul Hakim Molla
LCS No-1
|
2.17
|
|
|
30/04/2015
|
100
|
|
|
|
|
36
|
BDRIDP/BAR/AGL/CCA-EW/03
|
Resectioning of road from Temar Bastala to Hawla Bridge via Nagar GPS-Talbazar-lichermath Bazar road from Ch. 3840-4840m.
|
BDRIDP
|
agailjhara
|
|
1.00
|
|
|
3.45
|
Nolini Halder
LCS No-1
|
3.45
|
|
15/01/2017
|
30/04/2017
|
100
|
|
|
|
|
37
|
BDRIDP/BAR/AGL/UZ-EW/01
|
Improvement of road from Paisharhat GC to Shatla GC via Bagdha GC road by Earth work from Ch. 3800-5800m under Agailjhara Upazila, Barisal.
|
BDRIDP
|
agailjhara
|
|
2.00
|
|
|
10.92
|
Md. Sohrab Howlader
LCS No-1
|
1.24
|
|
20/02/2015
|
30/04/2015
|
100
|
|
|
|
|
38
|
BDRIDP/BAR/AGL/UN-EW/01
|
Improvement of road from Goila (DR) to Teimukhi via Bakal hat & Kodaldhoa bazar road by Earth work form Ch. 11192-13954m under Agailjhara Upazila, Barisal.
|
BDRIDP
|
agailjhara
|
|
2.76
|
|
|
16.05
|
Mahim Baishnab
LCS No-1
|
2.01
|
|
20/02/2015
|
30/04/2015
|
100
|
|
|
|
|
39
|
|
|
BDRIDP
|
agailjhara
|
|
|
|
|
16.05
|
Pangkoj Joydhor
LCS No-7
|
2.06
|
|
20/02/2015
|
30/04/2015
|
100
|
|
|
|
|
40
|
BDRIDP/BAR/BAB/CCA-RdR/06
|
Improvement of Road from Telerchar GPS -Najamrari Bari - Jahungirnagar UP road Start ch.1700m Satter Mirar Bari -Thakur. From Ch.0.0m - 550mSalvaged Cost Tk 192766.00
|
BDRIDP
|
babuganj
|
"506035103 506034109"
|
|
|
|
35.08
|
M/S Niaz Traders
|
31.57
|
|
18/01/2018
|
18/07/2018
|
50
|
|
|
08/04/2019
|
|
41
|
BDRIDP/BAR/BAB/CCA-Rd/07
|
Improvement of road from Jahapur Shilondia Bridge -Uttor Mujafforpur Peda Master bari under Jahangir Nagar Union a Bituminous Surfacing -wearing courseDC ch.190m -1190m b 1No. 2.0m x 2.0m & 1No.1.0m x1.0m RCC Box Culvert at Ch.273m & 615m under Babuganj U
|
BDRIDP
|
babuganj
|
506035018
|
1.00
|
|
|
69.55
|
M/S Amir Engineering Corporation
|
64.50
|
|
|
|
100
|
|
|
08/04/2019
|
|
42
|
BDRIDP/BAR/BAB/UN-Ew/01
|
Improvement of road from Dehergothi UP office to Kalir Bazar road by Earth Work from Ch. 1960m-3710m.
|
BDRIDP
|
babuganj
|
|
1.75
|
|
|
1.96
|
Md. Masum Hossain GaziLCS No-1
|
1.96
|
|
15/05/2015
|
30/09/2015
|
100
|
|
|
08/04/2019
|
|
43
|
BDRIDP/BAR/BAB/CCA-Ew/01
|
Improvement of road Shajahan Sikder Farm to Najam Mridha House via Idel Kathi High School By Earth Work under Dehergothi UP at Ch. 0.00m-2+350km.
|
BDRIDP
|
babuganj
|
|
2.35
|
|
|
2.85
|
TaslimaLCS No-1
|
2.85
|
|
15/05/2015
|
30/09/2015
|
100
|
|
|
08/04/2019
|
|
44
|
BDRIDP/BAR/BAB/CCA-Ew/02
|
Improvement of road Dehergothi in High School-Rahamotpur Krishi College via Khalik member's house by Earth Work under Dehergothi UP at Ch. 0.00m-4+320km.
|
BDRIDP
|
babuganj
|
|
4.32
|
|
|
3.81
|
Rajib HossainLCS No-1
|
3.81
|
|
15/05/2015
|
30/09/2015
|
80
|
|
|
08/04/2019
|
|
45
|
BDRIDP/BAR/BAB/CCA-Ew/03
|
Improvement of road Jayinpur madrasha to Dhaka Barisal RHD via Molla Bari by Earth Work under Dehergothi UP at Ch. 0.00m-2+600km.
|
BDRIDP
|
babuganj
|
|
2.60
|
|
|
3.01
|
Md. Liton HossainLCS No-1
|
3.01
|
|
15/05/2015
|
30/09/2015
|
100
|
|
|
08/04/2019
|
|
46
|
BDRIDP/BAR/BAB/CCA-EW/04
|
Improvement of road From Daroger hat to Shandha river bank via Battala Bazar road by Earth work from Ch. 0.00m-3900m.
|
BDRIDP
|
babuganj
|
|
3.90
|
|
|
3.55
|
Md. Kabir SikderLCS No-1
|
3.55
|
|
15/05/2015
|
30/09/2015
|
100
|
|
|
08/04/2019
|
|
47
|
BDRIDP/ BAR/BAB/ CCA-Rd/08
|
Improvement of Road from Ramjankathi GPS to Charalgi GPS. a Earthwark from Ch. 0- 1500m.b Carpeting DC from Ch. 0- 1500m.c Construction of 2 Nos 625mmx600mm U-Drain at Ch. 736m & 1285m.d Palisading Work 150.00m. Under Babuganj District- Barishal.
|
BDRIDP
|
babuganj
|
506035132
|
|
|
|
11562581.00
|
|
0.00
|
|
|
|
0
|
|
|
08/04/2019
|
|
48
|
BDRIDP/ BAR/BAB/ CCA-Rd/09
|
Improvement of from Khudrokathi Freedom Fighter Mogibor Rahaman Sikder House to Baige Comander Abdul Mojid Khan house. At Ch. 00m-1100m.Salvaged Cost Tk 285357.00i Earthwark Ch.0.00m-1100m.ii Carpeting DC Ch.0.00m-1100m. iii Construction of 02 Nos 0.625mx0.600m U-Drain. at Ch.110m & 400m.iv Palsading 46m.Under Babuganj Upazila Barishal District.
|
BDRIDP
|
babuganj
|
506034155
|
|
|
|
7945251.00
|
|
0.00
|
|
|
|
0
|
|
|
08/04/2019
|
|
49
|
BDRIDP/BAR/BABU/CCA-Rd/01
|
Improvement of road from Babugonj Agorpur GC to Mr. Younusur Rahman (Divisional Commissioner) house via Clubgonj hat by Carpeting from Ch. 750-1400m & 0.00-1550m.
|
BDRIDP
|
babuganj
|
|
0.80
|
|
|
97.92
|
M/S Lutful Kobir
|
107.50
|
|
17/07/2014
|
16/04/2015
|
100
|
|
|
|
|
50
|
BDRIDP/BAR/BAB/CCA-Rd(R)/02
|
Rehabilitation of road Shajahan Sikder Farm to Najam Mridha House via idel Kathi High School by Carpeting under dehergothi UP at Ch 00-2+350km.
|
BDRIDP
|
babuganj
|
|
2.35
|
|
|
97.19
|
M/S Atique Construction
|
101.73
|
|
|
|
100
|
|
|
|
|
51
|
BDRIDP/BAR/BAB/CCA-Rd(R)/03
|
Rehabilitation of road Dehergothi in High School-Rahamotpur Krishi College via Khalik member's house by Carpeting under Dehergoti UP at Ch. 00m-4+320km
|
BDRIDP
|
babuganj
|
|
4.32
|
|
|
185.18
|
M/S Atique Construction
|
193.87
|
|
|
|
100
|
|
|
|
|
52
|
BDRIDP/BAR/BABU/CCA-Rd/04
|
Improvement of road Jayinpur Madrasha to Dhaka Barisal RHD via Molla Bari by Carpeting under dehergoti UP at Ch. 00-2+600km.
|
BDRIDP
|
babuganj
|
|
2.60
|
|
|
99.59
|
M/S Atique Construction
|
104.29
|
|
|
|
100
|
|
|
|
|
53
|
BDRIDP/BAR/BAB/CCA-St/01
|
Construction of 4Nos RCC Box Culvert on road Shajahan Sikder Farm to Najam Mridha House via Idel Kathi High School Under Dehergothi UP at Ch 248m, 715m, 1414m & 1543m.
|
BDRIDP
|
babuganj
|
|
|
|
|
29.32
|
M/S Atique Construction
|
30.71
|
|
|
|
100
|
|
|
|
|
54
|
BDRIDP/BAR/BAB/CCA-St/02
|
Construction of 11Nos RCC Box Culvert on road from Dehergothi in High school-Rahamotpur Krishi College via Khalik member's house under Dehergothi UP at Ch. 797m, 1455m, 1602m, 1875m, 1965m, 2362m, 2535m, 2655m, 4140m & Link road 2250m & 380m.
|
BDRIDP
|
babuganj
|
|
|
|
|
47.44
|
M/S Atique Construction
|
49.69
|
|
|
|
100
|
|
|
|
|
55
|
BDRIDP/BAR/BAB/CCA-St/03
|
Construction of 5Nos RCC Box Culvert on road Jayipuri Madrasha to Dhaka Barisal RHD via Molla Bari Under Dehergothi UP at Ch. 1135m, 1612m, 2272m, 2375m, 2540m.
|
BDRIDP
|
babuganj
|
|
|
|
|
20.01
|
M/S Atique Construction
|
20.96
|
|
|
|
100
|
|
|
|
|
56
|
BDRIDP/BAR/BAB/CCA-St/04
|
Construction of 3.00m×3.00m 3 Nos 1.00m×1.00m 1Nos 2.00m×2.00m RCC Box Culvert on Daroger hat to Shandha river bank via Battala Bazar road at Ch. 33m, 2820m, 2980m, 3155m & 1785m.
|
BDRIDP
|
babuganj
|
|
|
|
|
19.82
|
M/S Atique Construction
|
20.76
|
|
|
|
100
|
|
|
|
|
57
|
BDRIDP/BAR/BAB/UN-St/01
|
Construction of 2 Nos 2.00×2.00m 1 No 1.60m×1.60m 1No 1.00m×1.00m RCC Box Culvert on Dehergothi UP office to Kalir Bazar road at Ch. 2475m, 2693m, 2860m & 3035m.
|
BDRIDP
|
babuganj
|
|
|
|
|
14.43
|
M/S Lutful Kobir
|
10.30
|
|
|
25/10/2015
|
100
|
|
|
|
|
58
|
BDRIDP/BAR/BAB/UN-Rd(R)/01
|
Rehabilitation of road from Dehergothi UP office to Kalir Bazar by BC from Ch. 1930m-3710m.
|
BDRIDP
|
babuganj
|
|
1.78
|
|
|
64.57
|
M/S Alvi Construction
|
51.94
|
|
|
|
100
|
|
|
|
|
59
|
BDRIDP/BAR/BAB/CCA-Rd/05
|
Improvement of road from Daroger hat to Shandha river bank via Battala bazar road By BC from Ch. 00-3800m under Babuganj Upazila, Barisal District.
|
BDRIDP
|
babuganj
|
|
3.80
|
|
|
143.08
|
M/S Atique Construction
|
149.79
|
|
|
|
100
|
|
|
|
|
60
|
BDRIDP/BAR/BAB/UN-RD/02
|
Improvement of Road from Agorpur UP Office (Chairman Hat) to Miar Hat via Jahapur under Jahangirnagor (Agorpur) UP at Ch. 0.00m-2110m
|
BDRIDP
|
babuganj
|
|
2.11
|
|
|
124.21
|
M/S Hasan Construction
|
115.70
|
|
29/11/2016
|
28/06/2017
|
100
|
|
|
|
|
61
|
BDRIDP/BAR/BAB/UN-St/02
|
Construction of No 6.00m Span OFC, 3 Nos 2.00m×2.00m & 2 Nos 1.60m×1.60m RCC Box Culvert on Road From Agorpur UP Office (Chairman Hat) to Miar Hat via Jahapur under Jahangirnagor (Agorpur) UP at Ch. 0.00m, 0.00m, 125m, 1101m, 1907m & 708m.
|
BDRIDP
|
babuganj
|
|
|
|
|
41.83
|
M/S Saifuddin Traders
|
41.80
|
|
20/11/2016
|
19/09/2017
|
100
|
|
|
|
|
62
|
BDRIDP/BAR/BAB/UN-EW/02
|
Resectioning of Road from Agorpur UP Office (Chairman Hat) to Miar Hat via Jahapur under Jahangirnagor (Agorpur) UP at Ch. 0.00m-2110m
|
BDRIDP
|
babuganj
|
|
2.11
|
|
|
2.91
|
Md. Habibur Rohman
LCS No-1
|
2.91
|
|
20/06/2016
|
20/10/2016
|
100
|
|
|
|
|
63
|
BDRIDP/BAR/BAK/CCA-Rd/01
|
Improvement of road from South side Dhola Sluice Gate to Alim Meridha Bari (Vary) via Sikder Bari, Manik Member Bari, Shatghor & Mannan Princhpal Bari (East side of Hanua Bridge to Shatghor via Shikder Bari) By HBB from Ch. 0.00-1013m.
|
BDRIDP
|
bakerganj
|
506075221
|
1.01
|
|
|
35.59
|
M/S Nahid Enterprise
|
39.86
|
|
24/07/2014
|
24/01/2015
|
100
|
|
|
08/04/2019
|
|
64
|
BDRIDP/BAR/BAK/UN-Rd(R)/01
|
Rehabilitation of Road from Kalaskati UP Office (Vumi Office) to Arshed Khayaghat via Kumarbari Bridge & Bagdia GPS road By BC from Ch. 00-1000m. (Salvage Cost Tk. 9,46,801.00) e-ID : 22666
|
BDRIDP
|
bakerganj
|
506073023
|
|
|
|
45.67
|
M/S Khondokear Brothers
|
35.24
|
|
28/07/2015
|
27/04/2016
|
75
|
|
|
08/04/2019
|
|
65
|
BDRIDP/BAR/BAK/CCA-Rd/03
|
Improvement of Dudhalmou Ferryghat(RHD) to Kanki Govt.Pry.School Road by Earth Work and HBB under Bakergonj Upazila, District -Barisal.
|
BDRIDP
|
bakerganj
|
506074120
|
|
|
|
176.42
|
Md. Sumsudhoa Mollick
|
161.39
|
|
28/12/2016
|
27/06/2017
|
100
|
|
|
08/04/2019
|
|
66
|
BDRIDP/BAR/BAK/CCA-Rd/04
|
Improvement of road from west Faridpur Ajgor Sikder Bari to DC road Ferry-ghat via H/O Rahim Mrida Road, a Earth Work from Ch. 0.0 - 1300.00m. b Bituminus Carpeting from Ch. 0.0 - 1300m c Construction of 1 No. 4.0m x 4.0m RCC Box Culvert at Ch. 425m. unde
|
BDRIDP
|
bakerganj
|
506074151
|
1.30
|
|
|
99.94
|
M/S Islam Brothers
|
89.95
|
|
|
|
100
|
|
|
08/04/2019
|
|
67
|
BDRIDP/BAR/BAK/CCA-Rd(R)/05
|
Improvement of road from ATIMKHANA to Bothra Road via Mr. Matiur Rahman (ASP) at Ch. 0.00m-500.00m (Efective Length= 475.00m) (ID No.506074225) under Bakergonj Upazila, Dist : Barisal [Salvaged cost : Tk1049647.00]
|
BDRIDP
|
bakerganj
|
|
0.50
|
|
|
33.05
|
M/S Osin Enterprise
|
29.74
|
|
24/01/2018
|
24/05/2018
|
100
|
|
|
08/04/2019
|
|
68
|
BDRIDP/BAR/BAK/CCA-Rd/07
|
Improvement of road from Sampur Ray Barir Culvert to Birangal Digirpar Kader Hohlade Bari via Karim Gaji Bari a Earth work 0.0 - 1500m b Bituminous Surfacing - wearing course DC 0.0m - 1500m c 1.5 m x 1.5m RCC Box Culvert at Ch.900m
|
BDRIDP
|
bakerganj
|
506075125
|
1.50
|
|
|
91.26
|
M/S Abul Kalam Azad
|
82.13
|
|
29/01/2018
|
29/10/2018
|
60
|
|
|
08/04/2019
|
|
69
|
BDRIDP/BAR/BAK/CCA-Rd/09
|
Improvement of Aulia DargabariRHD to Shyampur Hat via Dhokati Madrasha & Dhokati Govt.Pry.school Auliapur Dargabari RHD-Sampur Road Howlader Bari Trimohini to Syampur Hat via Ali Khan Bari a Earth work at Ch.4500-6000m b Carpeting BC at Ch.4500 - 6000m c
|
BDRIDP
|
bakerganj
|
506074119
|
1.50
|
|
|
147.92
|
Md. Nasir Uddin
|
137.43
|
|
|
|
100
|
|
|
08/04/2019
|
|
70
|
BDRIDP/BAR/BAK/UZ-Rd/01
|
Improvement of Rahamgonj RHD via Dhokati GPS & Bakergonj-Sampur Road to BoaliaGC Bakergonj-Sampur Road Mill Ghar to Auliapur Dargabari RHD-Sampur Road Howlader Bari Trimohini a Earth work at Ch.1913-2775mb CarpetingBC at Ch.1913-2775mc Construction of 1No
|
BDRIDP
|
bakerganj
|
506072014
|
0.86
|
|
|
85.83
|
M/s Kazi Holdings
|
79.95
|
|
|
|
90
|
|
|
08/04/2019
|
|
71
|
BDRIDP/BAR/BAK/Gha/01
|
Construction of Ghatla at Kaligonj Bazar Khal under Bakergonj Upazila Barisal .
|
BDRIDP
|
bakerganj
|
|
|
|
|
19.33
|
M/S S H Enterprise
|
18.85
|
|
|
|
40
|
|
|
08/04/2019
|
|
72
|
BDRIDP/BAR/BAK/CCA-RdR/10
|
Improvement of Road from Hanua UP Office Bridge to Sarder Bari Foot Bridge via Jainpuri Khanka Sarif Bari & Khodaboxkati Eshak Member Bari Char a Earth work at Ch.0.0 - 2000m b CarpettingBC Ch.0.0 -2000m c Construction of 1 No Box culvert 1.0m x 1.0m at ch.1310m d Protective worksPalisading 60m under Bakergonj UpazilaBarishal District. Salvaged Cost TK.1943192.00
|
BDRIDP
|
bakerganj
|
506074199
|
2.00
|
1.00
|
|
14520624.67
|
M/S Sikder Enterprise
|
0.00
|
|
|
|
15
|
|
|
08/04/2019
|
|
73
|
BDRIDP/BAR/BAK/UN-EW/01
|
Improvement of road from Kalaskati UP Office (Vumi Office) to Arshed Khaya Ghat via Kumarbari Bridge & Bagdia Govt. Pry. Schoo. Road by Earth Filling Work at Ch. 00m-4870m.
|
BDRIDP
|
bakerganj
|
506073023
|
4.87
|
|
|
2228745.00
|
|
0.00
|
16/04/2015
|
|
|
100
|
|
|
08/04/2019
|
|
74
|
BDRIDP/BAR/BAK/UZ-St/01
|
Construction of 23.00m Long RCC Girder Bridge over road from Kamarkali GC to Baharchar GC via Sarsi Pollice Farry Patkati L/G Faridpur UP Office & Janota Bajarat at Ch. 5847m Under Bakerganj Upazila District Barisal Road ID 506072012
|
BDRIDP
|
bakerganj
|
506072012
|
|
23.00
|
|
13048406.72
|
M/S SUN TRADERS
|
12395986.38
|
23/08/2018
|
23/08/2018
|
04/08/2019
|
80
|
|
|
08/04/2019
|
|
75
|
BDRIDP/BAR/BAK/CCA-Rd/11
|
Improvement of Road from Goma Amtala to Chatra Hat via Gajir Hat DKP High School & Sowdakar Bari Road by BC at Ch. 1600m-2100. Effective Length 500m.Under Bakerganj Upazila District- Barishal.
|
BDRIDP
|
bakerganj
|
506074136
|
0.50
|
|
|
3243472.30
|
|
0.00
|
|
|
|
0
|
|
|
08/04/2019
|
|
76
|
BDRIDP/BAR/BAK/CCA-Rd/12
|
Improvement of road from Kabiraj Altaf Chairman Bari near Madrasha to East Dhudal Community Pry School via Shahajahan Howlader & Alomgir Mollik Bari road by BC Ch. 736m-2000m. Under Bakerganj Upazila District- Barishal.
|
BDRIDP
|
bakerganj
|
506074148
|
1.26
|
|
|
8566686.78
|
|
0.00
|
|
|
|
0
|
|
|
08/04/2019
|
|
77
|
BDRIDP/BAR/BAK/CCA-Rd/13
|
Improvement of Road from Kabai Dhola Riazuddin Madrasha to Khodaboxkati Govt. Pry. School by BC work at Ch.00m-500 with 1 No. 900mx900m U-Drain. Under Bakerganj Upazila District- Barishal.
|
BDRIDP
|
bakerganj
|
506075432
|
0.50
|
0.90
|
|
3857006.71
|
|
0.00
|
|
|
|
0
|
|
|
08/04/2019
|
|
78
|
BDRIDP/BAR/BAK/CCA-Rd/14
|
A Improvement of road from Rabipur Ali Hossain Khan Bari UZR to Sharif Bari via Ayeb Boyati Bari i Earthwork Ch.0.0m-500m ii CarpetingDC Ch.0.0 - 500m.iii Palisading work-50m B Improvement of road from S/Side of Kabai HatNear Chunakhali Sluice Get to E/S of Pearpur Iron BridgeUZR via Chunakhali HatDhola Madrasa & Dhola Sluice Get i Earthwork Ch.4000m-5000m ii Carpeting DC Ch.4000m-5000m iii Construction of 2Nos 1.0m x 1.0m Box Culvert at Ch.4666m 4951m & 1No. U-Drain at Ch.4830m iv Palisading work-55m Under Bakergonj Upazila Barishal District
|
BDRIDP
|
bakerganj
|
"506075099 506074155"
|
2.00
|
3.00
|
|
11940345.81
|
|
0.00
|
|
|
|
0
|
|
|
08/04/2019
|
|
79
|
BDRIDP/BAR/BAK/CCA-Rd/15
|
Improvement of road East Bathsala UZR to Dhulia River Bank via Bathsala Karikornagar GPS infront of Amir Khan Bari Mosque Salvaged Cost Tk 331586.00 i Earthwark Ch.0.00m-1450m. ii Carpeting DC Ch.0.00m-1450m. iii Construction of 01 No U-Drain 0.9mx0.9m at Ch.1250m.iv Palasading 79m. Under Bakergonj Upazila Barishal District.
|
BDRIDP
|
bakerganj
|
506075379
|
1.45
|
0.90
|
|
10466500.00
|
|
0.00
|
|
|
|
0
|
|
|
08/04/2019
|
|
80
|
BDRIDP/BAR/BAK/CCA-Rd/16
|
Part A Improvement of road from H/O Sujauddin Halta F.H. high School. Halta Mouza Sholoshath to Surath Memorial GPS. i Earthwark Ch.0.00m-850m. ii Carpeting DC Ch.0.00m-850m. iii Construction of 02 Nos RCC Culvert1.6mx1.6m at Ch 4m845m 3 Nos U-Drain 0.9mx0.9m at Ch.120m190m235m.iv Palsading 96mPart B Improvement of road from Mokimabad Bajar S/Side of Culvert to East Side of BIP Siuce Get via Dilip Master Bari.Oza Bari to Thakur Bari via Naboraz Biswas bari i Earthwark Ch.2500m-3250m. ii Carpeting DC Ch. 2500m-3250m. iii Construction of 01 No RCC Culvert 1.6mx1.6m at Ch 3125m.iv Palsading 38m.Under Bakergonj Upazila District Barishal.
|
BDRIDP
|
bakerganj
|
"506075180 506075229"
|
0.75
|
1.60
|
|
14776000.00
|
|
0.00
|
|
|
|
0
|
|
|
08/04/2019
|
|
81
|
BDRIDP/BAR/BAK/CCA-Rd/17
|
Part A Improvement of road from Padrishibpur GPSUZR to Bismillah Bazar via Sikder Bari Kowabunia khal & Dhulal sadu Bari Salvaged Cost Tk 921459.76i Earthwark Ch.0.0m-900m. ii Carpeting DC Ch. 0.0 - 900m. iii Construction of 01 No 2.0 m x 2.0m RCC Box Culvert & 1No.U-Drain at Ch 482m.& 28m iv Palsading 59m.Under Bakergonj Upazila District Barishal. Part B Improvement of road from East side of Bangla bazar Box Culvert to Wapder Khal Ghorar Bridge Bothra via Biharipur Madrasha road. i Earthwark Ch.3250m-3850m. ii Carpeting DC Ch.3250m-3850m. iii Construction of 01 No 2.0 m x 2.0m RCC Box Culvert at Ch.3255m & 01 No 1.6 m x 1.6m RCC Box Culvert at Ch.3716m iv Palsading 28m.Under Bakergonj Upazila District Barishal.Part C Improvement of road from Padrishibpur Sunddartala Baily Bridge UZR to Aowal Sikderbari i Earthwark Ch.0.0m-500m. ii Carpeting DC Ch. 0.0 - 500m. Under Bakergonj Upazila District Barishal.
|
BDRIDP
|
bakerganj
|
"506074057 506074182 506075155"
|
1.90
|
|
|
16443000.00
|
|
0.00
|
|
|
|
0
|
|
|
08/04/2019
|
|
82
|
BDRIDP/ BAR/BAK/ CCA-Rd/18
|
Improvement of Road UZR Rabipur GPS UNR Younous Sharif Bari Via Rabipur. Salvaged Cost Tk 641271.00i Earthwark Ch.0.00m-500m. ii Carpeting DC Ch.0.00m-500m. iii Palsading 50m. Under Bakergonj Upazila Barishal District.
|
BDRIDP
|
bakerganj
|
506074267
|
|
|
|
3691293.00
|
|
0.00
|
|
|
|
0
|
|
|
08/04/2019
|
|
83
|
BDRIDP/BAR/BAK/UN-St/01
|
Construction of RCC Box Culvert over road from Kaloskati UP Office (Vumi Office) to Arshed Khayaghat via Kumarbari Bridge & Bagdia GPS with 7 Nos. 1.60mx1.60m at Ch. 850m, 1110m, 1456m, 1608m, 2507m, 3520m, 4245m & 2 Nos. 2vent 4.00mx4.00m at Ch. 1242m &
|
BDRIDP
|
bakerganj
|
|
|
|
|
73.40
|
M/S Khondokear Brothers
|
53.45
|
|
21/06/2015
|
20/06/2016
|
100
|
|
|
|
|
84
|
BDRIDP/BAR/BAK/UN-Rd(R)/02
|
Improvement of road from Kalaskati UP Office (Vumi Office) to Arshed Khayaghat via Kumarbari Bridge & Bagdia GPS road By BC from Ch. 1000m-4870m. e-ID : 22667
|
BDRIDP
|
bakerganj
|
|
|
|
|
180.93
|
M/S Khondokear Brothers
|
146.83
|
|
|
|
100
|
|
|
|
|
85
|
BDRIDP/BAR/BAK/CCA-Rd(R)/02
|
Rehabilitation of road from Gavikola Mannan Sikder Bari Foot Bridge to West side of Nilganj Foot Bridge via Moksad Khan,Kumarghudi & Kaptain Saye Bari by BC from Ch.00-810m [Salvaged Value Tk.10,53,654.00] e-ID : 29366
|
BDRIDP
|
bakerganj
|
|
0.81
|
|
|
35.54
|
Md. Nasir Uddin
|
26.20
|
|
|
|
100
|
|
|
|
|
86
|
BDRIDP/BAR/BAK/UN-Rd/03
|
Improvement of road from Faridpur Hat Kheya Ghat Durgapasa UP office Gobindapur Bothtala via Kakordha Bazar Road, a Earth Work from Ch. 4860m 7320m.b Bituminus Carpeting from Ch. 4860m 7470m.c Construction of 1 No. 1.60mx1.60m RCC Box Culvert at Ch. 7435
|
BDRIDP
|
bakerganj
|
|
2.46
|
|
|
164.60
|
Md Mafuz Khan
|
148.14
|
|
|
30/11/2018
|
100
|
|
|
|
|
87
|
BDRIDP/BAR/BAK/CCA-Rd/06
|
Improvement of road from Shashi Bazar Bridge-Telani Lunch Ghat Najrul Talukder Bari. under Bakergonj Upazila Dist:Barisal. a) HBB from Ch. 00m-1000m b) Protection Work 108m c) Earth work from Ch. 00m-1000m
|
BDRIDP
|
bakerganj
|
|
1.00
|
|
|
46.09
|
Md. Zakir Hossain Mia
|
45.63
|
|
24/01/2018
|
24/07/2018
|
100
|
|
|
|
|
88
|
BDRIDP/BAR/BAK/CCA-Rd/08
|
Improvement of Extended Portion of Dudhalmou Ferryghat (RHD) to Kanki Govt. Pry. School Road (Connecting Road Sheikh Hasina Cantonment).
|
BDRIDP
|
bakerganj
|
|
|
|
|
43.33
|
M/S Amir Engineering Corporation
|
28.78
|
|
20/01/2018
|
15/02/2018
|
100
|
|
|
|
|
89
|
BDRIDP/BAR/BAN/UZ-Rd/01
|
Improvement of road from Banaripara - Harta, At Ch.5865 -6865m under Banaripara Upazila, District Barisal.
|
BDRIDP
|
banaripara
|
|
1.00
|
|
|
70.14
|
M/S Saleha Enterprise
|
53.50
|
|
|
|
50
|
|
|
08/04/2019
|
|
90
|
BDRIDP/BAR/BAN/UZ-St/01
|
Construction of 1No.2.0m x 2.0m ,1 No.3.0m x 3.0m , 2Nos.4.0m x 4.0m , 1No.1.0m x 1.0m RCC Box Culvert & 3 Nos 0.625m x 0.625m U-Drain at Ch.5950m, 6787m, 6145m, 6230m, 6407m, 5871m, 6555m & 6622m on Banaripara-Harta Road.
|
BDRIDP
|
banaripara
|
|
|
|
|
75.32
|
M/S Soma Enterprise
|
54.62
|
|
|
|
100
|
|
|
08/04/2019
|
|
91
|
BDRIDP/BAR/BAN/UZ-St/02
|
Construction of 15.00m RCC Girder Bridge on Banaripara to Harta road at ch.8642km over B.Bari Khal under Banaripara UpazilaBarisal District
|
BDRIDP
|
banaripara
|
|
|
|
|
118.50
|
Md Mahfuz Khan
|
106.65
|
|
|
|
90
|
|
|
08/04/2019
|
|
92
|
BDRIDP/BAR/BAN/UZ-St/03
|
Construction of 15.00m RCC Girder Bridge on Banaripara to Harta road at ch.7162 km over Onil Ghat Khal under Banaripara UpazilaBarisal District
|
BDRIDP
|
banaripara
|
|
|
|
|
98.14
|
Md Mahfuz Khan
|
88.33
|
|
|
|
70
|
|
|
08/04/2019
|
|
93
|
BDRIDP/BAR/BAN/Gha/01
|
Construction of RCC Ghat at Mohish Katakhali Kheya Ghat under Banaripara Upazila Barisal .
|
BDRIDP
|
banaripara
|
|
|
|
|
29.12
|
M/S Amir Engineering Corporation
|
26.21
|
|
|
|
20
|
|
|