Lalmonirhat

LGED LALMONIRHAT , District Scheme Details

Project Name
Upazila

District Scheme Details

SL No. Package No. Package Name Project Name Upazila Name Road ID Length of Road (Km) Length of Bridge (M) Building Qauntity (No) Estimated Amount (Lac) Name of Contractor Contract Amount (Lac) Date of Contract Date of Commencement Date of Completion Physical Progress (%) Financial Progress (Amt) Financial Progress (%) Date of Progress Update Remarks
1 CIB-Lal-W-76 Const. of 220m long PSC Girder Bridge over Saniajan river on Goddimari Union Connecting road at Ch. 4100m under Upazilla: Hatibandha, District: Lalmonirhat. CIBRR hatibandha [Road ID:152333016] 220.00 93 0.00 M/S Islam Traders,1/D Central road,Ghop,Jossore. 2239.96 06/05/2019 13/05/2019 31/01/2023 99 2087.53 93 04/09/2024 work is ongoing
2 CRMIDP/LAMH/W-32 Shaptibari Hat CRMIDP aditmari 98 211.00 kmab&mcjv@gmail.com Sadar, Kurigram 175.18 21/01/2020 27/07/2021 99 167.42 98 20/07/2022
3 CRMIDP/LAMH/W-33 Borokata Hat CRMIDP hatibandha 19 330.00 M/S S.S Enterprise 266.03 14/05/2020 20/10/2021 40 50.00 19 20/07/2022
4 CRMIDP/LAMH/W-35 Jiber Hat CRMIDP kaliganj 39 213.00 M/S Shital & Tahity JV Kamal Kachna, Sadar, Rangpur. 176.69 15/01/2020 22/07/2021 65 68.57 39 20/07/2022
5 CRMIDP/LAMH/W-34 Rosulgonj Bazar Hat CRMIDP patgram 89 230.00 Susree Rani Roy 183.24 14/05/2020 20/05/2021 98 163.99 89 20/07/2022
6 GSIDP/LAL/DW-15 Improvement of Dowani Chake Post Jame Mosque,Under Goddimari Union. Latitude :26.1834, Longitude :89.0571. GSIDP hatibandha 100 3.00 H.S. Enterprise 2.85 100 100 02/04/2019
7 GSIDP/LAL/DW-16 Improvement of Nirala Hori Mondir,Under Goddimari Union,Latitude:26.1631, Longitude:89.1192. GSIDP hatibandha 100 3.00 H.S. Enterprise 2.85 100 100 02/04/2019
8 GSIDP/LAL/DW-23 Improvement of Central Graveyeard ,Under Singimari Union. Latitude :26.12381, Longitude :89.13927. GSIDP hatibandha 99 4.04 Abul & Brothers 3.84 100 99 02/04/2019
9 GSIDP/LAL/DW-25 Improvement of Purbo Bezgram Sarbojanin Hori Mondir,Under Tonvangha Union. Latitude :26.0982, Longitude :89.1700. GSIDP hatibandha 99 3.20 H.S. Enterprise 3.04 100 99 02/04/2019
10 GSIDP/LAL/DW-29 Improvement of Bhatiapara Jame Mosque,Under Patikapara Union.Latitude :26.05776, Longitude :89.14756. GSIDP hatibandha 99 3.00 M/S. Hena Traders 2.85 100 99 02/04/2019
11 IRIDP-2/LAL/DW-1 A )Improvement of road from Shaniajan R&H-Moriom Nessa GPS (ch. 00-2000m) B) Construction of U-Drain on Shaniajan R&H-Moriom Nessa GPS at ch.638m. IRIDP-2 hatibandha 152334102 2.00 119.65 Md. Alahe Baks 103.51 07/01/2016 100 20/03/2019
12 IRIDP-2/LAL/DW-2 Improvement of road from Nagir Hossain Khandoker Junmior school to Kamartari Road (ch. 00-1000m) IRIDP-2 hatibandha 152334066 1.00 51.66 Md. Monayem Khan 43.90 14/01/2016 100 20/03/2019
13 IRIDP-2/LAL/DW-3 Improvement of road from Kasim Bazar-Jawrani Hat via Sardartari Road (ch. 2000-2425m) IRIDP-2 hatibandha 152334023 0.43 21.23 M/s. Abu Taleb Milu 18.26 20/01/2016 100 20/03/2019
14 IRIDP-2/LAL/DW-4 Improvement of road from Bhabanipur Madrasha-Daikhowa Road (ch. 5820-6820m) IRIDP-2 hatibandha 152333002 1.00 49.33 M/s. Abu Taleb Milu 43.41 20/01/2016 100 20/03/2019
15 IRIDP-2/LAL/DW-5 Improvement of road from Patikabari GPS H/O Shoban uddin-Parulia Adorsho high school Road (ch. 00-1000m) IRIDP-2 hatibandha 152334082 1.00 52.91 M/s. Alomgir Hossain 47.00 17/01/2016 100 20/03/2019
16 e-Tender/NBIDGPS/LAL/ADI/2017-2018/W1-00455 TEPA PALASHI GOVT PARIMARY SCHOOL NBIDGPS-1 aditmari 51.71 S.Annonto Bikash Tripura 48.20 17/05/2018 03/02/2019 70 1 school
17 e-Tender/NBIDGPS/LAL/HAT/2017-2018/W1-00623 BHABANI PUR NBIDGPS-1 hatibandha 38.54 M/S S.S Enterprise 36.61 22/04/2018 30/01/2019 100 1 school
18 e-Tender/NBIDGPS/LAL/HAT/2017-2018/W1-00986 BISAN DAI NBIDGPS-1 hatibandha 31.06 M/S Jayardar Construction 29.51 23/05/2018 23/01/2019 95 1 school
19 e-Tender/NBIDGPS/LAL/HAT/2017-2018/W1-00987 PURBA BEJGRAM NBIDGPS-1 hatibandha 31.06 Md.Elias Hossain 29.51 04/06/2018 05/02/2019 95 1 school
20 e-Tender/NBIDGPS/LAL/HAT/2017-2018/W1-01363 UTTOR SINGI MARI NBIDGPS-1 hatibandha 38.54 Md. Mizanur Rahman Milon 36.61 18/07/2018 19/03/2019 95 1 school
21 e-Tender/NBIDGPS/LAL/HAT/2017-2018/W1-01364 PARULIA NBIDGPS-1 hatibandha 38.54 M/S Sumaya Traders 36.61 11/06/2018 12/02/2019 95 1 school
22 e-Tender/NBIDGPS/LAL/HAT/2017-2018/W1-01684 PSCHIM BISANDAI NBIDGPS-1 hatibandha 72.96 M/S medha Const. 74.10 12/08/2018 12/05/2019 70 1 school
23 e-Tender/NBIDGPS/LAL/HAT/2017-2018/W1-01685 CHAR GODDIMARI NBIDGPS-1 hatibandha 54.81 M/S. S.S. Construction 53.02 22/10/2018 30/07/2019 20 1 school
24 e-Tender/NBIDGPS/LAL/HAT/2018-2019/W1-02754 PASCHIM KADMA NBIDGPS-1 hatibandha 42.19 M/S Khairul Enterprise 39.13 01/01/2019 08/10/2019 20 1 school
25 e-Tender/NBIDGPS/LAL/KAL/2017-2018/W1-00686 CHALBALA DALGRAM NBIDGPS-1 kaliganj 50.61 RUDRA ENTERPRISE 48.88 19/04/2018 19/01/2019 95 1 school
26 e-Tender/NBIDGPS/LAL/PAT/2017-2018/W1-00453 SAT PANBARI GOVT. PRIMARY SCHOOL NBIDGPS-1 patgram 33.02 Md.Saleh ahmed 29.71 05/04/2018 04/01/2019 97 1 school
27 e-Tender/NBIDGPS/LAL/PAT/2017-2018/W1-00454 2NO. GHONABARI GOVT. PRIMARY SCHOOL NBIDGPS-1 patgram 56.20 Md.Saleh ahmed 49.71 05/04/2018 05/01/2019 95 1 school
28 e-Tender/NBIDGPS/LAL/PAT/2017-2018/W1-00624 BAMON PARA GOVT. PRIMARY SCHOOL NBIDGPS-1 patgram 68.46 Faria Construction 66.22 30/04/2018 30/04/2019 95 1 school
29 e-Tender/NBIDGPS/LAL/PAT/2017-2018/W1-00625 KASHIR DANGA GOVT. PRIMARY SCHOOL NBIDGPS-1 patgram 65.25 LD Trading 62.48 24/04/2018 24/01/2019 100 1 school
30 e-Tender/NBIDGPS/LAL/PAT/2018-2019/W1-02928 SAT GHALANGI GOVT. PRIMARY SCHOOL NBIDGPS-1 patgram 90.27 M/S-Sadman Traders 85.75 01/01/2019 01/09/2019 20 1 school
31 WNOBI-LAL(ADT)-UZRU-45 Improvement of Mohishkhocha GC-Namurihat Zila Road at Ch:0+000km-5+974km under Aditmari Upazila, District: Lalmonirhat (Road ID No: 152022007). NOBIDEP aditmari 152022007 5.95 0.00 0 595.84 Rafiq Construction Co. (Pvt.) Ltd, 18/1, Nayapaltan, Dhaka-1000 530.72 06/06/2016 13/06/2016 30/06/2018 100 524.64 0 12/07/2020  
32 WNOBI-LAL(ADT)-UNRU-117 Improvement of Amena Bazar UZR-2 to Dulali Bazar Road. Ch. 0+000km to Ch. 6+314km [Excluded part-Ch.1+506km to 1+796Km] (ID: 152023031) NOBIDEP aditmari 152023031 6.02 0.00 0 505.34 Islam Traders & Milon Construction (JV), 1/583, Kanastay Monjil, Guratipara, Rangpur 447.22 31/12/2017 07/01/2018 06/01/2019 100 436.63 0 12/07/2020  
33 WNOBI-LAL(ADT)-UNRU-117 Improvement of Amena Bazar UZR-2 to Dulali Bazar Road. Ch. 0+000km to Ch. 6+314km [Excluded part-Ch.1+506km to 1+796Km] (ID: 152023031) NOBIDEP aditmari 152023031 6.02 0.00 0 505.34 Islam Traders & Milon Construction (JV), 1/583, Kanastay Monjil, Guratipara, Rangpur 447.22 31/12/2017 07/01/2018 06/01/2019 100 436.63 0 12/07/2020  
34 WNOBI-LAL(ADIT)-UZRR-GOB-27 Rehabilitation of Durgapur GC-Durakuti GC via Mogolhat road Ch.00-6290m. Road ID No. 152022005. NOBIDEP aditmari 152022005 6.29 0.00 0 749.09 M/S. Abdul Hakim, Aditmari, Lalmonirhat. 649.44 04/08/2019 11/08/2019 10/08/2020 80 0.00 0 12/07/2020  
35 WNOBI-LAL(ADT)-UNRU-117 Improvement of Amena Bazar UZR-2 to Dulali Bazar Road. Ch. 0+000km to Ch. 6+314km [Excluded part-Ch.1+506km to 1+796Km] (ID: 152023031) NOBIDEP aditmari 152023031 6.02 0.00 0 505.34 Islam Traders & Milon Construction (JV), 1/583, Kanastay Monjil, Guratipara, Rangpur 447.22 31/12/2017 07/01/2018 06/01/2019 100 436.63 0 12/07/2020  
36 WNOBI-LAL(ADT)-UNRU-117 Improvement of Amena Bazar UZR-2 to Dulali Bazar Road. Ch. 0+000km to Ch. 6+314km [Excluded part-Ch.1+506km to 1+796Km] (ID: 152023031) NOBIDEP aditmari 152023031 6.02 0.00 0 505.34 Islam Traders & Milon Construction (JV), 1/583, Kanastay Monjil, Guratipara, Rangpur 447.22 31/12/2017 07/01/2018 06/01/2019 100 436.63 0 12/07/2020  
37 WNOBI-LAL(ADT)-UNRU-117 Improvement of Amena Bazar UZR-2 to Dulali Bazar Road. Ch. 0+000km to Ch. 6+314km [Excluded part-Ch.1+506km to 1+796Km] (ID: 152023031) NOBIDEP aditmari 152023031 6.02 0.00 0 505.34 Islam Traders & Milon Construction (JV), 1/583, Kanastay Monjil, Guratipara, Rangpur 447.22 31/12/2017 07/01/2018 06/01/2019 100 436.63 0 12/07/2020  
38 WNOBI-LAL(ADT)-UNRU-117 Improvement of Amena Bazar UZR-2 to Dulali Bazar Road. Ch. 0+000km to Ch. 6+314km [Excluded part-Ch.1+506km to 1+796Km] (ID: 152023031) NOBIDEP aditmari 152023031 6.02 0.00 0 505.34 Islam Traders & Milon Construction (JV), 1/583, Kanastay Monjil, Guratipara, Rangpur 447.22 31/12/2017 07/01/2018 06/01/2019 100 436.63 0 12/07/2020  
39 WNOBI-LAL(ADT)-UNRU-117-B Construction of 20m Long RCC Girder Bridge on Amana Bazar UZR-2 to Dulai Bazar Road. Ch. 01+635km Under Aditmari Upazila, District: Lalmonirhar. (Road ID No. 152023031) NOBIDEP aditmari 152023031 20.00 0 188.92 Islam Traders & Milon Construction (JV), 1/583, Kanastay Monjil, Guratipara, Rangpur 157.74 29/11/2017 06/12/2017 05/12/2018 100 154.04 0 12/07/2020  
40 WNOBI-LAL(HAT)-UNRU-97 Improvement of Dakalibandha to fepranogre (Dawabari up) via ketkibari road at Ch:0+000km- 10+398km under Hatibandha Upazila, District: Lalmonirhat. Road ID: 152333010). NOBIDEP hatibandha 152333010 10.40 0.00 0 710.00 Md. Khairul Kabir Rana, S.M.C. Road, Guptapara, Rangpur 649.50 06/06/2016 13/06/2016 31/10/2019 90 516.13 0 12/07/2020  
41 WNOBI-LAL(HAT)-UNRU-97 Improvement of Dakalibandha to fepranogre (Dawabari up) via ketkibari road at Ch:0+000km- 10+398km under Hatibandha Upazila, District: Lalmonirhat. Road ID: 152333010). NOBIDEP hatibandha 152333010 10.40 0.00 0 710.00 Md. Khairul Kabir Rana, S.M.C. Road, Guptapara, Rangpur 649.50 06/06/2016 13/06/2016 31/10/2019 90 516.13 0 12/07/2020  
42 WNOBI-LAL(HAT)-UNRU-97 Improvement of Dakalibandha to fepranogre (Dawabari up) via ketkibari road at Ch:0+000km- 10+398km under Hatibandha Upazila, District: Lalmonirhat. Road ID: 152333010). NOBIDEP hatibandha 152333010 10.40 0.00 0 710.00 Md. Khairul Kabir Rana, S.M.C. Road, Guptapara, Rangpur 649.50 06/06/2016 13/06/2016 31/10/2019 90 516.13 0 12/07/2020  
43 WNOBI-LAL(HAT)-UNRU-97 Improvement of Dakalibandha to fepranogre (Dawabari up) via ketkibari road at Ch:0+000km- 10+398km under Hatibandha Upazila, District: Lalmonirhat. Road ID: 152333010). NOBIDEP hatibandha 152333010 10.40 0.00 0 710.00 Md. Khairul Kabir Rana, S.M.C. Road, Guptapara, Rangpur 649.50 06/06/2016 13/06/2016 31/10/2019 90 516.13 0 12/07/2020  
44 WNOBI-LAL(HAT)-UNRU-97 Improvement of Dakalibandha to fepranogre (Dawabari up) via ketkibari road at Ch:0+000km- 10+398km under Hatibandha Upazila, District: Lalmonirhat. Road ID: 152333010). NOBIDEP hatibandha 152333010 10.40 0.00 0 710.00 Md. Khairul Kabir Rana, S.M.C. Road, Guptapara, Rangpur 649.50 06/06/2016 13/06/2016 31/10/2019 90 516.13 0 12/07/2020  
45 WNOBI-LAL(HAT)-UNRU-97 Improvement of Dakalibandha to fepranogre (Dawabari up) via ketkibari road at Ch:0+000km- 10+398km under Hatibandha Upazila, District: Lalmonirhat. Road ID: 152333010). NOBIDEP hatibandha 152333010 10.40 0.00 0 710.00 Md. Khairul Kabir Rana, S.M.C. Road, Guptapara, Rangpur 649.50 06/06/2016 13/06/2016 31/10/2019 90 516.13 0 12/07/2020  
46 WNOBI-LAL(HAT)-UNRU-97-B Construction of 16m Long RCC Girder Bridge on Dakalibandha to Fepranogore (Dauwabari UP) via Khetibari Road at Ch. 8+412km Under Hatibandha Upazila, District: Lalmonirhat. Road ID:152333010 NOBIDEP hatibandha 152333010 16.00 0 146.06 M/S. Abu Taleb Milu, Kaliganj, Lalmonirhat 137.18 19/12/2017 26/12/2017 25/12/2018 100 136.72 0 12/07/2020  
47 WNOBI-LAL(KLG)-UZRU-46 Improvement of Durakuti GC-Zila Road at Bhularhat via Chaparhat. at Ch. 0+000km to Ch. 10+736km Under Kaliganj Upazila, District: Lalmonirhat. (ID No. 152392008) NOBIDEP kaliganj 152392008 10.74 0.00 0 640.25 M/s. Abu Taleb Milu, Kaliganj, Lalmonirhat 671.87 31/07/2016 07/08/2016 10/03/2019 100 548.75 0 12/07/2020  
48 WNOBI-LAL(KALI)-UZRR-82 Rehabilitation of Zila Road at Kakina-Duhuli Jorgacha GC Road (Ch. 0+000km to 8+900km (152392006) NOBIDEP kaliganj 152392006 8.90 0.00 0 1022.22 Md. Abul Hossain & M/S Paradise Traders JV, Shaheb Bazar, Ghoramara, Rajshahi, Bangladesh. 827.10 10/03/2020 17/03/2020 0 0.00 0 12/07/2020  
49 WNOBI-LAL(SAD)-UZRU-47 Improvement of Lalmonirhat Upazila H/Q at Purbo Thanapara to Mohendranagar GC via Dhebdhebir Hat Road at Ch. 0+000km.- 10+883km (Excluding Ch. 0+390km - 2+883km.) under Sadar Upazila, District: Lalmonirhat. (ID No. 152552010) NOBIDEP lalmonirhat-s 152552010 8.39 0.00 0 655.41 Hakim-Nufa (JV), Aditmari, Lalmonirhat 620.01 24/11/2015 01/12/2015 31/05/2017 100 614.88 0 12/07/2020  
50 WNOBI-LAL(SAD)-UZRR-73 Rehabilitation of Mustofir Hat ZR - Mohendranagar GC Road at ch. 0+000 - 5+530 km under Sadar Upazila, District: Lalmonirhat (Road ID NO. 152552002) NOBIDEP lalmonirhat-s 152552002 5.53 0.00 0 515.09 Sujib Ranjan Das, 197 Proukta Akota, Bagbari, Sylhet. 435.66 17/01/2016 24/01/2016 15/06/2017 100 431.00 0 12/07/2020  
51 WNOBI-LAL(SAD)-UZRR-GOB-25 Rehabilitation of Barobarihat GC-Rajarhat Upazila H/Q via Sindurmoti Ch.00-7810m. Road ID No. 152552004. NOBIDEP lalmonirhat-s 152552004 7.81 0.00 0 732.55 Nufa-ZHD JV, Hhoshpara, Sadar, Kurigram 715.75 04/08/2019 11/08/2019 10/08/2020 80 0.00 0 12/07/2020  
52 WNOBI-LAL(PAT)-UNRU-98 Improvement of Patgram UP to Varverirhat via Kawamarihat and Kalirhat Road. at Ch.0+000 to 12+126km. Under Patgram Upazila, District: Lalmonirhat. (ID No. 152703005) NOBIDEP patgram 152703005 12.13 0.00 0 839.06 Md. Moyenuddin (Bashi), Jail road, Ghope, Jessore 761.32 24/04/2016 01/05/2016 05/03/2019 100 748.31 0 12/07/2020  
53 WNOBI-LAL(PAT)-UNRB-189 Construction of 284m long PC Girder Bridge on Patgram UP-Ververy hat via Kawamarihat and Kalirhat Road over Dhaka River. at Ch.3+175m Under Patgram Upazila, District:Lalmonirhat.(Road ID No.152703005) NOBIDEP patgram 152703005 284.00 0 1466.21 IT & FT JV, Central Road, Ghope, Jessore.Mobile: 01912941144 E-mail: msislam.traders@yahoo.com 1237.90 05/02/2017 12/02/2017 30/06/2020 87 1219.17 0 12/07/2020  
54 WNOBI-LAL(PAT)-UNRU-98 Improvement of Patgram UP to Varverirhat via Kawamarihat and Kalirhat Road. at Ch.0+000 to 12+126km. Under Patgram Upazila, District: Lalmonirhat. (ID No. 152703005) NOBIDEP patgram 152703005 12.13 0.00 0 839.06 Md. Moyenuddin (Bashi), Jail road, Ghope, Jessore 761.32 24/04/2016 01/05/2016 05/03/2019 100 748.31 0 12/07/2020  
55 WNOBI-LAL(PAT)-UNRU-98 Improvement of Patgram UP to Varverirhat via Kawamarihat and Kalirhat Road. at Ch.0+000 to 12+126km. Under Patgram Upazila, District: Lalmonirhat. (ID No. 152703005) NOBIDEP patgram 152703005 12.13 0.00 0 839.06 Md. Moyenuddin (Bashi), Jail road, Ghope, Jessore 761.32 24/04/2016 01/05/2016 05/03/2019 100 748.31 0 12/07/2020  
56 WNOBI-LAL(PAT)-UNRU-98 Improvement of Patgram UP to Varverirhat via Kawamarihat and Kalirhat Road. at Ch.0+000 to 12+126km. Under Patgram Upazila, District: Lalmonirhat. (ID No. 152703005) NOBIDEP patgram 152703005 12.13 0.00 0 839.06 Md. Moyenuddin (Bashi), Jail road, Ghope, Jessore 761.32 24/04/2016 01/05/2016 05/03/2019 100 748.31 0 12/07/2020  
57 WNOBI-LAL(PAT)-UNRU-98 Improvement of Patgram UP to Varverirhat via Kawamarihat and Kalirhat Road. at Ch.0+000 to 12+126km. Under Patgram Upazila, District: Lalmonirhat. (ID No. 152703005) NOBIDEP patgram 152703005 12.13 0.00 0 839.06 Md. Moyenuddin (Bashi), Jail road, Ghope, Jessore 761.32 24/04/2016 01/05/2016 05/03/2019 100 748.31 0 12/07/2020  
58 WNOBI-LAL(PAT)-UNRU-98 Improvement of Patgram UP to Varverirhat via Kawamarihat and Kalirhat Road. at Ch.0+000 to 12+126km. Under Patgram Upazila, District: Lalmonirhat. (ID No. 152703005) NOBIDEP patgram 152703005 12.13 0.00 0 839.06 Md. Moyenuddin (Bashi), Jail road, Ghope, Jessore 761.32 24/04/2016 01/05/2016 05/03/2019 100 748.31 0 12/07/2020  
59 WNOBI-LAL(PAT)-UNRU-98-B Construction of 30m Long RCC Girder Bridge on Patgram UP-Ververihat via Kawamarihat and Kalihat Road at CH. 01+850km Under Patgram Upazila, District: Lalmonirhat. (Road ID No.152703005) NOBIDEP patgram 152703005 30.00 0 200.89 M/S Bashundhara, R.K. road, Thikaderpara, Kurigram. 209.94 01/12/2016 07/12/2016 08/04/2019 100 209.91 0 12/07/2020  
60 PRO/LAL/PAT/UNR/19-20/W-57 Improvement of Bituminous carpeting Road Sadhur Bazar-Guddimari Road at Ch: 1500m-3700m including Construction of 4Nos 1x 0.90mX0.900 m RCC Box Culvert at Ch: 2475m,2600m,3200m & 3640.00m and 1Nos 1x 2.0mX1.50 m RCC Box Culvert at Ch: 3030m Under Hatibandha Upazila ,District Lalmonirhat PROVATi hatibandha 152333016 2.20 5.20 0 82.19 Taheti & Shital (ZV), Kamal kachnu, Rangpur 73.97 15/04/2020 22/04/2020 21/04/2021 5 48.98 0 31/07/2020 প্যালাসাইডিং এর পোষ্ট এর কাজ চলমান। প্রি-ওয়াক নেওয়া হবে।
61 PRO/LAL/PAT/VR/19-20/W-77 Improvement of Singimari Nebru House-Uttor Baraipara Masque Rd. Road Ch: 1150m -3260m including Construction of 2Nos 7.00x 0.900m x 0.900m Cross-Drain at Ch: 2122 m & 2952m Under Upazila: Hatibandha, District:Lalmonirhat. PROVATi hatibandha 152334090 2.11 2.70 0 236.55   195.20 01/01/1900 0 0.00 0 31/07/2020 Estimate approved on June-20
62 PRO/LAL/PAT/MM/2019-20/W-63 Improvement of Karbalardighi R&H Road-Dakhalibandha Hat Road. Road Ch: 0.00m-2550.00m including Construction of 2Nos 2.00m x 1.50m Box culvert on Karbalardighi R&H Road-Dakhalibandha Hat Road. C/D st Ch: 1072 m & 2500m. Under Upazila: Hatibandha, District:Lalmonirhat. PROVATi hatibandha 152334018 2.55 5.00 0 17.61   17.61 01/01/1900 0 0.00 0 31/07/2020 Estimate approved on 16-8-20
63 PRO/LAL/PAT/MM/2019-20/W-64 Construction of Muktijoddha Bazar (LCS-1,2,3) PROVATi hatibandha   0.00 0 14.94   14.94 01/01/1900 0 0.00 0 31/07/2020 Estimate approved on 13-8-20
64 PRO/LAL/ HATI/VR/18-19/W-33 Construction of Nawdabash Hat (LCS-1,2,3) PROVATi hatibandha   0.00 0 77.69   73.80 01/01/1900 0 71.31 0 31/07/2020 Estimate approved on 13-8-20
65 PRO/LAL/HATI/VR/18-19/W-34 i) Jongra UP office (Futir Doba) to Shafinagar hat road. Ii) Aftab More to Shofinogorhat via Hosnabad Community Clinic & Mokbul Jahanara Hossain GPS road. iii) Olerpar to Dahagram Chairman bari road. PROVATi hatibandha 152703020 3.17 0.00 0 176.69   156.35 01/01/1900 0 115.38 0 31/07/2020 Estimate approved on July-20
66 PRO/LAL/HATI/VR/18-19/W-36 Improvement of Niz Sheck Sundor Jameh Mosue Applax Embankment road. Ch. 500m-1765m. including Construction of 7.00x0.900mx 0.900m Cross drain at Ch. 995m under Hatibandha Upazila, District Lalmonirhat. PROVATi hatibandha 152335060 1.27 0.90 0 150.03 Ali Mostafiz ZV, Patgram, Lalmonirhat. 130.52 11/04/2019 18/04/2019 17/03/2020 100 118.60 0 31/07/2020 ফাইনাল বিল হয়েছে। ‡cf‡g›U Gi mKj †jqv‡ii KvR mgvß n‡q‡Q| BD‡Wªb Gi KvR mgvß n‡q‡Q|‡cÖv‡Uw±f IqvK© Gi KvR †kl n‡q‡Q, Nvm jvMv‡bv nqwb| mg¯Í wej wRIwe n‡Z cÖ`vb Kiv i‡q‡Q|
67 PRO/LAL/HATI/VR/18-19/W-45 Improvement of Bituminous Carpeting Road on WAPDA Pucea road to Dimla Bordar road at Ch.0.00m-3000.0m. including Construction of 2.00x 2.00 Cross drain at Ch. 2415.00m and Construction of 2 Nos 7x0.900mx0.900m Cross drain at Ch. 295.00m & 930.00m Under Hatibandha Upazila, District Lalmonirhat. PROVATi hatibandha 152334015 3.00 4.20 0 133.08 M/S Islam Traders, Ghop Jossor, Lalmonirhat. 115.75 10/04/2019 17/04/2019 01/09/2020 98 103.68 0 31/07/2020 কার্পেটিং শেষ। টার্পিং এর কাজ চলমান।
68 PRO/LAL/HATI/VR/18-19/W-46 Improvement of Bituminous carpeting Road on Patikapara Dowabari Up Boder To Kapil Member house Road at Ch. 00-1000m. including Construction of 2.00 Nos 0.900m x 0.900m Cross drain at Ch. 295.00m & 930.00m Under Hatibandha Upazila, District Lalmonirhat. PROVATi hatibandha 152335034 1.00 1.80 0 188.47 Borsha Enterprise, Patgram, Lalmonirhat 163.89 30/04/2019 10/06/2019 09/06/2020 97 107.15 0 31/07/2020 ‡cf‡g›U Gi mKj ‡jqv‡ii KvR mgvß| gvwU I Uvwc©s Gi KvR Aviv¤¢ Ki‡e||জামানত ‡`Iqv n‡q‡Q|
69 PRO/LAL/HATI/VR/18-19/W-47 Improvement of Bituminous carpeting Road on East Side Singimari Up Kalam Chatal to Goddimari Elahir Chatal at Ch. 0.00-2000.00m. Under Hatibanhda Upazila, District Lalmonirhat. including(D): Construction of 2.00 Nos (2.50x2.50) m Cross Drainges Structure on East Side Singimari Up Kalam Chatal to Goddimari Elahir Chatal at Ch. 0.00-2000.00m. Under Hatibanhda Upazila, District Lalmonirhat.(Structure)(E): Construction of 1.00 Nos (3.00x2.50) m Cross Drainges Structure on East Side Singimari Up Kalam Chatal to Goddimari Elahir Chatal at Ch. 0.00-2000.00m. Under Hatibanhda Upazila, District Lalmonirhat. (Structure) PROVATi hatibandha 152334068 2.00 8.00 0 188.95 Anta & SH ZV, Patgram, Lalmonirhat 164.08 09/06/2019 10/06/2019 09/11/2019 99 93.93 0 31/07/2020 কার্পেটিং শেষ। টার্পিং এর কাজ চলমান।
70 PRO/JAM/DEW/RMP/19-20/MW-99 Improvement of Bituminous carpeting Road R&H Nowabab Uddin House-Laxmi Kanto Chokider House at Ch.0.00m-1000.00m. including Construction of 1.00 Nos (3.00x2.50) m Cross Drainges Structure at Ch.661.00m. Under Hatibanhda Upazila, District Lalmonirhat. PROVATi hatibandha 152334088 1.00 3.00 0 34.67 Nakshi Mobail Palace, Sadar, Kurigram 0.00 14/05/2019 21/05/2019 01/03/2020 100 0.00 0 31/07/2020 ফাইনাল বিল হয়েছে।
71 PRO/JAM/DEW/RMP/19-20/MW-100 Improvement of Bituminous carpeting Road Paschim Bisondai Mouza To Sattar Chairman House Road Ch 0.00m-2000.00m including Construction of 4.00 Nos 7.00x0.900x0.900 Cross drain At Ch.113m, 417m, 1280m, &2560m Under Hatibandha Upazila, District Lalmonirhat. PROVATi hatibandha 152335033 2.00 3.60 0 8.45 M/S Alahi Box, Kaligonj, Lalmonirhat 0.00 19/06/1919 26/06/2019 25/05/2020 98 0.00 0 31/07/2020 ‡cf‡g›U Gi mKj ‡jqv‡ii KvR mgvß| †cÖv‡Uv±f IqvK© Gi KvR n‡e bv, Kvib Ab¨ cÖKí n‡Z eªxR n‡e|| BD †Wªb Gi KvR mgvß n‡q‡Q|
72 PRO/JAM/BAK/VR/18-19/W-29 Improvement of Bituminous carpeting Road on Applax Badth to Dimla Border Road at Ch 0.00m-1800.0m including Construction of 3.00 Nos 0.900 X 0.900 Cross drain at Ch. 400.00m, 700.00m & 1000.00m on Applax Badth to Dimla Border Road. Under Hatibanhda Upazila, District Lalmonirhat. PROVATi hatibandha 152335061 1.80 2.70 0 275.00 Ali Mostafiz ZV, Patgram, Lalmonirhat. 277.36 24/07/2019 31/07/2019 16/06/2020 100 54.15 0 31/07/2020 ফাইনাল বিল প্রেরন করেছেন।
73 PRO/LAL/HATI/UNR/19-20/W-78 Improvement of Bituminous carpeting Road on Patgram Zila Road at Koborstan to Sarkarhat Jongra UP Road at Ch. 00-2185m. Under Patgram Upazila, District Lalmonirhat. PROVATi patgram 152703010 2.19 0.00 0 234.00 M/S fahim Traders, Kurigram Sadar, Kurigram. 192.76 01/01/1900 18/04/2019 17/03/2020 100 0.00 0 31/07/2020 কার্পেটিং শেষ। টার্পিং এর কাজ চলমান।
74 PRO/LAL/PAT/UNR/19-20/W-55 Improvement of Bituminous carpeting Road Jongra UP office (Futir Doba) to Sofinagadhat Road at Ch 00m-1000m. Under Patgram Upazila, District Lalmonirhat. PROVATi patgram 152703020 1.00 0.00 0 208.96 M/S Zahurul Haque, Kurigram Sadar, Kurigram 188.06 18/02/2020 25/02/2020 24/02/2021 68 0.00 0 31/07/2020 WveøyweGg G KvR Pjgvb|
75 PRO/LAL/PAT/UNR/19-20/W-56 Improvement of Bituminous carpeting Road on Patgram Zila Road at Kabarstanhat to Lalitarhat Kuchlibari UP Road at Ch: 1435m-3435m including Construction of 4Nos (1x2.00x1.50)m RCC.Box Culvert and 1 No (2x4.50x2.50)m RCC.Box Culvert Under Patgram Upazila ,District Lalmonirhat . PROVATi patgram 152703019 2.00 20.50 0 98.42 M/S Zahurul Haque, Kurigram Sadar, Kurigram 88.58 18/02/2020 25/02/2020 24/02/2021 30 55.35 0 31/07/2020 সাববেজ চলমান
76 PRO/LAL/HATI/VR/19-20/W-127 Improvement of Bituminous carpeting Road on Kamerarhat Sreerampur UP via Dr.Hamidur Islam House Road at Ch: 900m-1995m Under Patgram Upazila ,District Lalmonirhat . PROVATi patgram 152703007 1.10 0.00 0 187.70 M/S Zahurul Haque, Kurigram Sadar, Kurigram 0.00 28/02/2020 25/02/2020 24/02/2021 65 0.00 0 31/07/2020 WveøyweGg G KvR Pjgvb|
77 PRO/LAL/PAT/VR/19-20/W-76 Improvement of Bituminous carpeting Road on Kasirdanga-Bazar to 3 no Vothatkhata GPS Road at Ch: 00m-2000m including Construction of 6Nos 1x1.50x1.00 m RCC Box Culvert at Ch: 830m, 870m,1120m, 1200m,1566m &1800m and 3Nos 1x3.00x2.00 m RCC Box Culvert under Patgram Upazila ,District Lalmonirhat PROVATi patgram 152704084 2.00 15.50 0 251.99 Taheti & Shital (ZV), Kamal kachnu, Rangpur 211.42 15/04/2020 22/04/2020 21/04/2021 5 0.00 0 31/07/2020 Sand filling চলমান।
78 PRO/LAL/PAT/VR/19-20/W-75 Improvement of Bituminous carpeting Road on Nayerhat Mosque to Zero point of Dhagram UP Road at Ch: 1000m-4000m including construction of 1Nos 1x2.00x2.50 m RCC Box Culvert at Ch: 1310m Under Patgram Upazila ,District Lalmonirhat PROVATi patgram 152705059 3.00 2.50 0 82.46 Md. Abdul Hossain, Ghoramara Rangpur. 69.82 30/04/2020 05/07/2020 02/06/2021 10 0.00 0 31/07/2020 Sand filling চলমান।
79 PRO/LAL/PAT/MM/2019-20/W-67 Improvement of Bituminous carpeting Road on Lolitarhat – Liakot Prodhan House Via Kolshirmuk BOP & Graipul Road at Ch: 4000m-4950m Under Patgram Upazila ,District Lalmonirhat PROVATi patgram 152705121 0.95 0.00 0 10.25 GRP & RT (ZV), GL Roy Road, Rangpur. 10.25 15/04/2020 22/04/2020 21/04/2021 40 3.78 0 31/07/2020 সাববেজ চলমান
80 PRO/LAL/PAT/RMP/20-21/ MW-131 Construction of Sharkarar Hat (LCS-1,2,3) PROVATi patgram   0.00 0 20.12   0.00 01/01/1900 0 0.00 0 31/07/2020 Estimate approved on 13-8-20
81 PRO/LAL/PAT/VR/18-19/W-03 Construction of Shafinagar Hat, Upazila: Patgram, District: Lalmonirhat PROVATi patgram   0.00 0 69.75   66.27 01/01/1900 0 66.25 0 31/07/2020 অগ্রিম কিস্তি 50% প্রদান করা হয়েছে। ভ্যাট, আইটি, ল্যাব ও 10% ঠিকাদারের মুনাফা কেটে রাখা হয়েছে। (5,00,000.00 টাকার চাহিদার মধ্যে)। Est Approved on 21-11-19
82 PRO/LAL/HATI/VR//18-19/W-04 Construction of Kamarer Hat Bazar, Upazila: Patgram, District: Lalmonirhat PROVATi patgram   0.00 0 101.21   88.40 01/01/1900 0 88.40 0 31/07/2020 LCS Training Completed. Contract will be signed soon, Est Approved on 21-11-19
83 PRO/LAL/HATI/VR/18-19/W-05 Construction of Kamarer Hat Bazar, Upazila: Patgram, District: Lalmonirhat PROVATi patgram   0.00 0 276.20   244.05 01/01/1900 0 221.87 0 31/07/2020 LCS Training Completed. Contract will be signed soon, Est Approved on 21-11-19
84 PRO/LAL/HATI/VR/18-19/W-35 Improvement of Bituminous Carpeting Road on Altab More to Safinagarhat via Hasnabad Community Clinik & Mokbul Jahanara Hossin GPS at Ch. 700-1700m. Under Patgram Upazila, District Lalmonirhat. PROVATi patgram 152705151 1.00 0.00 0 82.65 M/S RML Enterprise, Hatibandha, Lalmonirhat. 78.51 18/03/2019 25/03/2019 24/03/2020 100 74.23 0 31/07/2020 ফাইনাল বিল হয়েছে। জামানত প্রদান করা হয়েছে।
85 PRO/JAM/BAK/VR/18-19/W-30 Improvement of Bituminous carpeting Road on Sarkarerhat Mosque to Borovita at Ch 0.00m-2500.0m. Under Patgram Upazila, District Lalmonirhat. PROVATi patgram 152704023 2.50 0.00 0 176.22 Fahim Traders, Kurigram Sadar, Kurigram 158.00 24/07/2019 31/07/2019 65 164.83 0 31/07/2020 XEN issued letter to Contractor RE: Time ext./performance Security WvweøDweGg Gi KvR Pigvb|
86 PRO/JAM/ ISL/VR/18-19/W-31 Improvement of Bituminous carpeting Road Dhobolsuti Mosque to Kamararhat Road at Ch 0.500m-3050.0m. Under Patgram Upazila, District Lalmonirhat. PROVATi patgram 152704034 2.55 0.00 0 223.68 Fahim Traders, Kurigram Sadar, Kurigram 206.25 24/07/2019 31/07/2019 60 129.31 0 31/07/2020 XEN issued letter to Contractor RE: Time ext./performance Security সাববেজ চলমান
87 CW-34/RCIP/LAL 1. Improvement of Hatibandha-Daikhowa Hat (Road ID152332002, Upazila: Hatibandha, District: Lalmonirhat) 2. Improvement of ZR at Baninagar to DaiKhowa GC. (Road ID152392003, Upazila: Kaligonj, District: Lalmonirhat) 3. Improvement of ZR at Baninagar-Durakuti GC. (Road ID152392001, Upazila: Kaligonj, District: Lalmonirhat) 4. Improvement of Burirhat GC-Bhelabari GC Road (Road ID152022003, Upazila: Aditmari, District: Lalmonirhat) RCIP hatibandha 152332002 33.61 0.00 92 4168.16 Mir Habibul Alam-M/S. Rupantor-Abdul Hakim (JV), House No-116/1, Road No-10 Dhap Chikli Vata, Gangachara Road, Rangpur. 4153.66 23/09/2019 01/10/2019 17/11/2022 100 3540.11 92 05/01/2023 Carpeting Completed
88 RDRIIP/LAL/ UZ -060 Improvement of Zila Road at Saptibari-Mohishocha GC Road (Ch. 3234-4234m). RDRIIP aditmari 1.00 70.59 M/S S.S Enterprise Khatapara, Aditmari Lalmonirhat. 65.10 09/04/2015 15/04/2016 100  
89 RDRIIP/LAL/ UZ -061 Improvement of Zila Road at Saptibari-Mohishocha GC Road (Ch. 4234-5234m). RDRIIP aditmari 1.00 68.22 M/S Nufa Construction Aditmari Lalmonirhat. 66.26 09/04/2015 30/06/2016 100  
90 RDRIIP/LAL/ UZ -092 Improvement of Zila Road at Saptibari-Mohishocha GC Road (Ch. 2600-2834m & 5234-5409m). RDRIIP aditmari 0.41 27.78 M/S Abdul Hakim, Aditmari, Lalmonirhat. 27.76 09/04/2015 30/10/2017 100  
91 RDRIIP/LAL/ UN-022 Improvement of Sharpukur UP - Bhelabari UP Road (Ch. 00-1000m). RDRIIP aditmari 1.00 62.86 M/S Sheikh Traders Sadar, Lalmonirhat. 57.46 12/08/2014 20/01/2016 100  
92 RDRIIP/LAL/ UN - 217 Improvement of Bhadai UP office (Kachari Bazar) - Galandhi hat via House of Suresh Master Road (Ch. 3320-4320m). RDRIIP aditmari 1.00 58.03 M/S Milon Construction, Guratipara, Rangpur. 49.80 06/04/2016 30/12/2017 100  
93 RDRIIP/LAL/ UN - 218 Improvement of Moshiskhocha UP office (Akabarer Chowpotee) - Palashi Bazer via Chowdhury Bazer Road (Ch. 1300-2300m). RDRIIP aditmari 1.00 64.98 M/S Nufa Construction, Aditmari, Lalmonirhat. 54.38 06/04/2016 30/10/2017 100  
94 RDRIIP/LAL/ UN - 219 Improvement of Durgapur UP Office -Moshistali Ferrey Ghat Road (Ch. 00-1000m). RDRIIP aditmari 1.00 62.39 M/S Abdul Hakim, Aditmari, Lalmonirhat. 55.88 06/04/2016 30/10/2017 100  
95 RDRIIP/LAL/ UN -260 Improvement of Durgapur UP Office - Moshistali Ferrey Ghat road ( Israiler Chatal - Mohistoli hat road) (Ch. 00-500m). RDRIIP aditmari 0.50 46.21 Md. Hasibul Hassan, Robertsongonj, Alamnagar, Rangpur. 40.79 28/06/2016 30/06/2018 100  
96 RDRIIP/LAL/ UN -261 Improvement of Saptibari UP (Chowrasta ZR Road) - Kumrirhat.Road (Ch. 534-943m & 1257-1348m). RDRIIP aditmari 0.50 29.46 M/S Rahid Traders, Purbo Thana Para, Sadar, Lalmonirhat. 26.09 28/06/2016 30/06/2018 100  
97 RDRIIP/LAL/ UN -262 Improvement of Durgapur UP at Shatibari Bazer -Mogalhat via G/Morua school.Road (Ch. 123-623m). RDRIIP aditmari 0.50 29.90 Md. Hasibul Hassan, Robertsongonj, Alamnagar, Rangpur. 26.61 28/06/2016 30/06/2018 100  
98 RDRIIP/LAL/ UN-346 Improvement Of Sakowar Bazar - Shaptibari UPC Debirpat Bazar Road Ch. 2430 - 3490m RDRIIP aditmari 71.41 M/S Onto Enterprise, Thanapara, Lalmonirhat. 64.27 29/03/2018 05/08/2018 100  
99 RDRIIP/LAL/ VR -147 Improvement of Purboo Dailjhor - Durakuti Road (Ch. 00-500m). RDRIIP aditmari 0.50 27.45 M/S S.S Enterprise Khatapara, Aditmari Lalmonirhat. 25.50 09/04/2015 16/06/2016 100  
100 RDRIIP/LAL/ VR -148 Improvement of Hurmurirhat - Anandabazar Road (Ch. 00-500m). RDRIIP aditmari 0.50 28.57 M/S S.S Enterprise Khatapara, Aditmari Lalmonirhat. 26.40 09/04/2015 30/06/2016 100  
101 RDRIIP/LAL/ VR -205 Improvement of Bamaner Basha – Lohakuchi via Sahidul dilar house (Burirdighirhat – UZR-2 near Bamuner Chowpati) Road (Ch. 00-1100m). RDRIIP aditmari 1.10 57.71 M/S Abu Taleb Milu Kaligonj, Lalmonirhat. 51.34 09/07/2015 15/01/2016 100  
102 RDRIIP/LAL/ VR -254 Improvement of Boshiltari Amtola more - Ferduser Chatal Road (Mogolhat Ziran Mondir - Boshintari Bodar Chowpotee) (Ch. 00-500m). RDRIIP aditmari 0.50 35.38 Md. Jahirul Islam Titu, Rail Bazar, Lalmonirhat. 29.51 05/04/2016 15/06/2018 100  
103 RDRIIP/LAL/ VR -319 Improvement of Mohishkhocha LGED Godawn - Ablar bazar Road (Ch. 00-500m). RDRIIP aditmari 0.50 30.59 M/S Nufa Construction, Aditmari, Lalmonirhat. 32.09 30/07/2016 30/10/2017 100  
104 RDRIIP/LAL/ VR -320 Improvement of UZR-3 at Hazirthan - UZR-2 at Amena bazar Road (Ch. 00-500m). RDRIIP aditmari 0.50 38.75 M/S Nufa Construction, Aditmari, Lalmonirhat. 40.65 20/07/2016 30/10/2017 100  
105 RDRIIP/LAL/ LCS-27 jvjgwbinvU †Rjvi Avw`Zgvix Dc‡Rjvaxb 8wU BDwbq‡bi MÖvgxY `yt¯’ gwnjv‡`i Øviv moK iÿYv‡eÿY KvR| RDRIIP aditmari 154.22 92.53 LCS 87.25 01/07/2015 30/06/2017 100  
106 RDRIIP/LAL/ TR-017 Tree Plantation work on Bhadai UP office (Manan’s Mill) - Burrirdigirhat road.(Ch.00-2000m).(effective length=2000m). RDRIIP aditmari 2.00 3.01 LCS women 3.01 30/06/2016 100  
107 RDRIIP/LAL/ UZ-046 Improvement of Barakhata GC – Boura GC Road via Tjhangjhara ( Rail corssing - Dalapara Via Thanghara Road (Ch. 00-1000m). RDRIIP hatibandha 1.00 62.53 Md. Samsul Haque, Patgram, Lalmonirhat. 68.48 31/12/2014 30/12/2015 100  
108 RDRIIP/LAL/ UZ-047 Improvement of Barakhata GC – Boura GC Road via Tjhangjhara ( Rail corssing - Dalapara Via Thanghara Road (Ch. 1000-1925 & 3940-4515m). RDRIIP hatibandha 1.50 88.71 M/S Nufa Construction, Aditmari, Lalmonirhat. 109.34 05/01/2015 30/05/2016 100  
109 RDRIIP/LAL/ UN -126 Improvement of Barakhata – Patgram Thana Border Road (Ch. 2380-2880m). RDRIIP hatibandha 0.50 25.66 M/S Abu Taleb Milu Kaligonj, Lalmonirhat. 27.08 07/05/2015 13/11/2015 100  
110 RDRIIP/LAL/ UN - 205 Improvement of Hatiabndha Auditorium - Jahir Miah House Via BGP Camp Road (Hatibandha Auditorium - Dhubni Primary School) Road (Ch. 945-1945m). RDRIIP hatibandha 1.00 56.57 A.K.M. Majedur Rahman, Hatibandha, Lalmonirhat. 47.26 07/03/2016 13/09/2016 100  
111 RDRIIP/LAL/ UN - 206 Improvement of Velaguri UP - Jawranir Hat (Boderhat to Velaguri UP Via Jawranir hat) Road (Ch. 1000-2000m). RDRIIP hatibandha 1.00 58.89 M/S Rifat Traders, House No-491, G.L. Roy Road, Rangpur. 50.94 13/03/2016 30/03/2017 100  
112 RDRIIP/LAL/ UN - 207 Improvement of Gotamari GC - Chetnai hat Road (Ch. 1110-2110m). RDRIIP hatibandha 1.00 59.56 A.K.M. Majedur Rahman, Hatibandha, Lalmonirhat. 49.86 07/03/2016 30/04/2017 100  
113 RDRIIP/LAL/ UN -322 Improvement of Zosnar Bazar to Chaparhat via Bhelaguri UP Road (Ch. 00-500m). RDRIIP hatibandha 0.50 26.76 M/S Abu Taleb Milu Kaligonj, Lalmonirhat. 26.66 30/08/2017 28/06/2018 100  
114 RDRIIP/LAL/ UN -323 Improvement of Gotamari GC to Chetnai hat - Near Abdul Kalam Vice-Chairman house Road (Ch. 3100-3800m). RDRIIP hatibandha 0.70 37.40 M/S Rifat Traders, House No-491, G.L. Roy Road, Rangpur. 39.09 22/08/2017 28/06/2018 100  
115 RDRIIP/LAL/ VR-019 Improvement of Hafiz Sahabuddin Mazar – Goddimarihat U.P office Pucca Road (Ch. 1748-2248m). RDRIIP hatibandha 0.50 25.03 Kazi Nazrul Islam, Goshala Bazar Lalmonirhat. 24.57 20/08/2014 27/02/2015 100  
116 RDRIIP/LAL/ VR-020 Improvement of Milon Bazar – Singimari BOP Camp Road (Ch. 00-500m). RDRIIP hatibandha 0.50 25.03 Kazi Nazrul Islam, Goshala Bazar Lalmonirhat. 25.57 20/08/2014 16/08/2015 100  
117 RDRIIP/LAL/ VR-021 Improvement of Hatibandha Hat – Chaddabari via Salbari Road (Ch. 00-700m). RDRIIP hatibandha 0.70 36.44 Md. Kolam Rabbani Prodhan, Patgram, Lalmonirhat. 34.89 20/08/2014 15/10/2015 100  
118 RDRIIP/LAL/ VR-022 Improvement of Goddimari Doctor Para Jame Mosque to Pandit Para GPS Road (Ch. 00-500m). RDRIIP hatibandha 0.50 25.03 Md. Kolam Rabbani Prodhan, Patgram, Lalmonirhat. 24.53 20/08/2014 30/11/2015 100  
119 RDRIIP/LAL/ VR-100 Improvement of Barakhata BOP – Singimari BOP Road ( Barakhata Bazar – Dolapara BOP camp Khabibor Army House) (Ch. 1000-2000m). RDRIIP hatibandha 1.00 51.25 M/S Abul Hakim Aditmari, Lalmonirhat. 49.97 15/01/2015 21/07/2015 100  
120 RDRIIP/LAL/ VR-101 Improvement of Barakhata BOP – Singimari BOP Road ( Barakhata Bazar – Dolapara BOP camp Khabibor Army House) (Ch. 00-1000m). RDRIIP hatibandha 1.00 57.21 M/S Alomgir Hossain Kaligonj, Lalmonirhat. 54.00 05/01/2015 11/07/2015 100  
121 RDRIIP/LAL/ VR -161 Improvement of Fakirpara UP Office – Fakirpara GPS Road (Ch. 500-1000m). RDRIIP hatibandha 0.50 25.25 M/S Abu Taleb Milu Kaligonj, Lalmonirhat. 26.47 07/04/2014 13/11/2015 100  
122 RDRIIP/LAL/ VR -162 Improvement of East side of Gendukuri Hat – North side Daikhowa Hat Road (Ch. 500-1000m). RDRIIP hatibandha 0.50 25.25 M/S Abu Taleb Milu Kaligonj, Lalmonirhat. 26.52 07/05/2015 13/11/2015 100  
123 RDRIIP/LAL/ VR-191 Improvement of Barakhata Paikertati GPS – Vangha Mosque Road (Ch. 500-2410m). RDRIIP hatibandha 1.91 125.47 M/S Alomgir Hossain Kaligonj, Lalmonirhat. 112.30 19/07/2015 24/07/2016 100  
124 RDRIIP/LAL/ VR-244 Improvement of Barakhata BOP – Singimari BOP Road ( Barakhata Bazar – Dolapara BOP camp Khabibor Army House) (Ch. 2000-3200m). RDRIIP hatibandha 1.20 67.31 M/S Abu Taleb Milu Kaligonj, Lalmonirhat. 57.15 13/03/2016 19/09/2016 100  
125 RDRIIP/LAL/ VR -307 Improvement of Jorapukur - Dalalpara GPS Road (Jhora Pukur R&H - Makligonj road) (Ch. 495-995m). RDRIIP hatibandha 1.20 26.86 Md. Golam Rabbani Prodhan, Patgram, Lalmonirhat. 26.81 26/06/2016 30/06/2017 100  
126 RDRIIP/LAL/ VR -308 Improvement of Saniajan Pucca road - Badher Par Road (Ch. 1210-1710m). RDRIIP hatibandha 1.20 28.94 A.K.M Majedur Rahman, Hatibandha, Lalmonirhat. 25.98 12/07/2016 30/06/2017 100  
127 RDRIIP/LAL/ VR -382 Improvement of Votemari Bazar - Site of River Road (Ch. 00-465m). RDRIIP hatibandha 0.47 19.36 M/S Asrafi Traders, Tushbhander, Kaligonj, Lalmonirhat. 16.18 03/11/2016 09/05/2017 100  
128 RDRIIP/LAL/ VR -383 Improvement of IDB Road Tarur more - Goddimari Road (Ch. 500-1075m). RDRIIP hatibandha 0.58 36.11 M/S Khandakaer Traders, Thana Road, Lalmonirhat. 30.69 06/11/2016 12/05/2017 100  
129 RDRIIP/LAL/ VR -504 Improvement of Jaurani hat - Latabor Mouza Road (Ch. 00-500m). RDRIIP hatibandha 0.50 26.38 M/S Rifat Traders, House No-491, G.L. Roy Road, Rangpur. 27.56 22/08/2017 28/06/2018 75  
130 RDRIIP/LAL/ VR -505 Improvement of Daikhowahat - Amjhol Pry.School Road (Ch. 1500-2000m). RDRIIP hatibandha 0.50 26.72 M/S Rifat Traders, House No-491, G.L. Roy Road, Rangpur. 27.92 12/08/2017 28/06/2018 100  
131 RDRIIP/LAL/ BR-023 Construction of 42.00m Long RCC Girder Bridge on Shadur Bazar - Goddimari raod at Ch. 2800.00m. RDRIIP hatibandha 42.00 188.78 M/S K M Abu Bakar, College Road, Kurigram. 155.00 08/09/2016 31/05/2018 45  
132 RDRIIP/LAL/ M-018 Maintenance of Barakhata GC - Hatibandha GC Road (Ch. 00-6108m). RDRIIP hatibandha 6.11 82.40 Bijoy Kumar Sur, Patgram, Lalmonirhat. 56.14 31/05/2016 06/12/2016 100  
133 RDRIIP/LAL/ HB-05 Improvement of Digirhat Rural Market under Singimari UP. RDRIIP hatibandha 1.00 29.99 Md. Zahedul Islam, Patgram, Lalmonirhat. 23.32 26/06/2016 02/01/2017 100  
134 RDRIIP/LAL/ LCS-29 jvjgwbinvU †Rjvi nvwZevÜv Dc‡Rjvaxb 12wU BDwbq‡bi MÖvgxY `yt¯’ gwnjv‡`i Øviv moK iÿYv‡eÿY KvR| RDRIIP hatibandha 228.28 136.97 LCS 136.04 01/07/2015 30/06/2017 100  
135 RDRIIP/LAL/ UN-118 Improvement of Boirati Kashur Bari - Mojiborer Bari Road (Zila road near Kaliganj – Kakina UP office via Aminganj. (Ch. 380-1380m). RDRIIP kaliganj 1.00 61.32 Md. Allhe Baks, Kaligonj, Lalmonirhat. 61.19 04/03/2015 31/01/2016 100  
136 RDRIIP/LAL/ UN -125 Improvement of Zila Road at Kaligonj to Kakina UP Uttar Bangla Collage via Amingonj Hat Road (Ch. 8791-9800m, Effective Length = 1000m). RDRIIP kaliganj 1.00 51.80 Md. Allhe Baks, Kaligonj, Lalmonirhat. 44.96 23/04/2015 31/01/2016 100  
137 RDRIIP/LAL/ UN -196 Improvement of Chanrdopur UP - Lohakuchi via Bolairhat Road (Ch. 00-1000m). RDRIIP kaliganj 1.00 63.96 M/S Rifat Traders, House No-491, G.L. Roy Road, Rangpur. 52.45 25/02/2016 31/12/2017 100  
138 RDRIIP/LAL/ UN -324 Improvement of Tushbander UP - Dalagram UP Road (Ch. 4300-5996m). RDRIIP kaliganj 1.70 106.77 Md. Allhe Baks, Kaligonj, Lalmonirhat. 96.09 30/08/2018 30/06/2018 100  
139 RDRIIP/LAL/ UN -325 Improvement of Madati UP Office - Valabari UP Office Via Dado Bairagi Bridge Road (Ch. 1400-2400m). RDRIIP kaliganj 1.00 56.44 Md. Allhe Baks, Kaligonj, Lalmonirhat. 50.80 30/08/2017 28/06/2018 100  
140 RDRIIP/LAL/ VR-024 Improvement of Kazirhat Baninogre at Gopal Roy GPS – H/O Md Babor Ali Road (Ch. 00-500m). RDRIIP kaliganj 0.50 26.90 M/S Alomgir Hossain Kaligonj, Lalmonirhat. 22.48 12/08/2014 27/02/2015 100  
141 RDRIIP/LAL/ VR-025 Improvement of Pachmata bazar - uttar gopal raye Md. Abdur Rashid house (Chapartal R&H – Baninagar Namurirhat UZR at Kazirhat via Panchabati) Road (Ch. 00-500m). RDRIIP kaliganj 0.50 26.90 Md. Alahe Baks Kaligonj, Lalmonirhat. 24.17 27/07/2014 31/01/2016 100  
142 RDRIIP/LAL/ VR-135 Improvement of Kaligonj Bazar Petrol Pump – H/O Sadar Moktar (Kaliganj Substation – Sreekhata) Road (Ch. 220-1226m). (Effective Length = 1000m). RDRIIP kaliganj 1.00 58.11 M/S Abu Taleb Milu Kaligonj, Lalmonirhat. 60.87 25/03/2015 30/11/2015 100  
143 RDRIIP/LAL/ VR-153 Improvement of R&H - Hospital - Chamta via H/O Nosiuddin at Balapara Mosque Road (Ch. 00-1650m) at Ch. 500m & 643m Connecting road 165m & 380m Length). RDRIIP kaliganj 2.20 122.46 M/S Abu Taleb Milu Kaligonj, Lalmonirhat. 106.55 09/04/2015 15/04/2016 100  
144 RDRIIP/LAL/ VR-160 Improvement of Hazrania R&H - Baburbari Hat Road (Ch. 00-500m). RDRIIP kaliganj 0.50 28.54 Md. Allhe Baks, Kaligonj, Lalmonirhat. 22.02 23/04/2015 31/01/2016 100  
145 RDRIIP/LAL/ VR -323 Improvement of Keranipara Milu House -Gegra GPS (Rubeya Sorok) road (Ch. 00-650m). RDRIIP kaliganj 0.65 56.85 Md. Alahe Baks, Kaliganj, Lalmonirhat. 49.17 09/08/2016 30/06/2017 100  
146 RDRIIP/LAL/ VR -324 Improvement of Kaliganj H/Q - Dologram UP Road at H/O Pintu - Sreekhata via Gegra Road (Ch. 00-750m). RDRIIP kaliganj 0.75 42.49 M/S Alomgir Hossain, Kaliganj, Lalmonirhat. 36.55 09/08/2016 13/01/2017 100  
147 RDRIIP/LAL/ VR-361 Improvement of Baninagar- Durakuti (Chaparhat)-Chandrapurhat via Kadamtoli Bridge(Baninagar-Durakuti(Chaparhat) to Kadamtola Bridge via Latabor Dakhil Madrasha) Road (Ch.00-500m). RDRIIP kaliganj 0.50 28.41 Md. Alahe Baks, Kaliganj, Lalmonirhat. 24.35 28/09/2016 30/07/2017 100  
148 RDRIIP/LAL/ BR-027 Construction of 36.00m Long RCC Girder Bridge on Tushbhandar UP - Awliarhat via Aminganj road at Ch.4620.00m. RDRIIP kaliganj 36.00 146.34 M/S Basundhara, RK Road, Kurigram. 113.17 04/10/2016 31/05/2018 50  
149 RDRIIP/LAL/ M-048 Maintenance of Kakina R&H - Shankardah - Mohipur - Burirhat GC Road (Ch. 00-5280m). RDRIIP kaliganj 5.28 974.63 Kamal Associates, New Airport Road, Banani, Dhaka. 877.17 20/06/2017 25/05/2018 100  
150 RDRIIP/LAL/ LCS-28 jvjgwbinvU †Rjvi KvjxMÄ Dc‡Rjvaxb 8wU BDwbq‡bi MÖvgxY `yt¯’ gwnjv‡`i Øviv moK iÿYv‡eÿY KvR| RDRIIP kaliganj 154.22 92.53 LCS 89.95 01/07/2015 30/06/2017 100  
151 RDRIIP/LAL/ TR-018 Tree Plantation work on Kazirhat – Chandrapur UP via Chalbala UP road.(Ch.00-3000m).(effective length=3000m). RDRIIP kaliganj 3.00 4.49 LCS women 4.49 30/06/2016 100  
152 RDRIIP/LAL/ UN-097 Improvement of Gokunda UP at Kharkharia Bridge – Rajpur UP Road (1620-2620m). RDRIIP lalmonirhat-s 1.00 50.34 M/S Alomgir Hossain Kaligonj, Lalmonirhat. 53.18 08/02/2015 30/03/2017 100  
153 RDRIIP/LAL/ UN - 216