Loading...

Thakurgaon

LGED THAKURGAON , District Scheme Details

Project Name
Upazila

District Scheme Details

SL No. Package No. Package Name Project Name Upazila Name Road ID Length of Road (Km) Length of Bridge (M) Building Qauntity (No) Estimated Amount (Lac) Name of Contractor Contract Amount (Lac) Date of Contract Date of Commencement Date of Completion Physical Progress (%) Financial Progress (Amt) Financial Progress (%) Date of Progress Update Remarks
1 CRMIDP/THKR/W-07 Schooler Hat CRMIDP baliadangi 80 23700000.00 M/S Khan Enterprise Setabgonj, Dinajpur 19132986.33 06/02/2020 31/05/2022 31/05/2022 82 15300358.00 80 18/07/2022
2 CRMIDP/THKR/W-08 Zadurani Hat CRMIDP haripur 19 35700000.00 Shikder Construction & B 26633750.81 26/01/2021 12/01/2022 22/03/2022 25 5170638.00 19 18/07/2022
3 CRMIDP/THKR/W-09 Borchuna CRMIDP pirganj 83 32500000.00 M. Ehteshamul Haque Jail Road, Dinajpur. 27536477.14 03/11/2020 11/05/2021 92 22809814.00 83 18/07/2022
4 CRMIDP/THKR/W-10 Nekmorod CRMIDP ranisankail 28 31900000.00 M. H Corporation & MSE (JV), Boda, Panchagarh. 26607723.48 30/01/2020 29/04/2021 50 7434067.00 28 18/07/2022
5 GSIDP/THAK/DW-11 Improvement of Boundary wall at Vornia Gorosthan.Under Dharmogarh Union, Ranisankail Upazila. Latitude:25.96916, Longitude;88.19696. GSIDP ranisankail 6.00 Md. Abdul Quddus 5.70 21/05/2018 20/10/2018 100  
6 GSIDP/THAK/DW-12 Improvement of Boundary wall at Ranisankail Eidgah. Under Ranisankail Union , Ranisankail Upazila. Latitude:25.875247, Longitude;88.263304. GSIDP ranisankail 5.00   4.75 17/05/2018 16/10/2018 100  
7 GSIDP/THAK/DW-13 Improvement of Ranisankail Gorkoi Giue Mondir & Boundary wall .Under Dharmogarh Union, Ranisankail Upazila Latitude:25.97032, Longitude; 88.22066. GSIDP ranisankail 6.00 Md. Abdul Quddus 5.70 21/05/2018 20/10/2018 100  
8 GSIDP/THAK/DW-14 Improvement of Boundary Wall of East side of Kasipur Eidgah.Under Kasipur Union, Ranisankail Upazila. Latitude:26.05347, Longitude;88.22367. GSIDP ranisankail 6.50 MS Khalil Traders 6.18 20/05/2018 19/10/2018 90  
9 GSIDP/THAK/DW-15 Improvement of Ranisankail Soshan Ghat .Under Ranisankail Union, Ranisankail Upazila. Latitude:25.894874, Longitude; 88.263000. GSIDP ranisankail 5.00 M/S. Al Saad Construction 4.75 27/05/2018 26/10/2018 100  
10 GSIDP/THAK/DW-1 Improvement of Maddhajhargaon Jame Mosque.Under Akhanagar Union, Sadar Upazila. Latitude:26.1356, Longitude;88.3525. GSIDP thakurgaon-s 5.00 M/S. R.M Enterprise 4.75 17/05/2018 16/10/2018 100  
11 GSIDP/THAK/DW-2 Improvement of Bakpur barunirghat Shahang.Under Akcha Union,Sadar Upazila. Latitude:26.0764, Longitude;88.4435. GSIDP thakurgaon-s 5.00 M/S. Shohid Traders 4.75 17/05/2018 16/10/2018 100  
12 GSIDP/THAK/DW-3 Improvement of Keshurbari Nathpara Shashan ghat West side of Senua River.Under Borogaon Union,Sadar Upazila. Latitude:26.1242, Longitude ; 88.4370. GSIDP thakurgaon-s 5.00 Md. Abdullah 4.75 14/05/2018 13/10/2018 100  
13 GSIDP/THAK/DW-4 Improvement of Boundary Wall of East side of Bully nazar Graveyard.Under Balia Union,Sadar Upazila. Latitude:26.1242, Longitude;88.5370. GSIDP thakurgaon-s 5.00 Md. Abdul Quddus 4.75 21/05/2018 20/10/2018 100  
14 GSIDP/THAK/DW-5 Improvement of Rasulpur Asrom.Under Jamalpur Union, Sadar Upazila. Latitude:25.9843, Longitude;88.4218. GSIDP thakurgaon-s 5.00 Md. Tojammul Haque 4.75 24/05/2018 23/11/2018 100  
15 GSIDP/THAK/DW-6 Improvement of Improvement of Boundary Wall of of Uttar Asannagor Graveyard ,Under Rajagaon Union, Sadar Upazila.Latitude:26.2548, Longitude ;88.6271. GSIDP thakurgaon-s 5.00 Md. Javed Sikdar 4.75 21/05/2018 20/10/2018 100  
16 GSIDP/THAK/DW-7 Improvement of Kalikagaon Shoshanghat & room.Under Shukhanpukuri Union,Sadar Upazila. Latitude:26.4987, Longitude;88.1542. GSIDP thakurgaon-s 5.00 Md. Tojammul Haque 4.75 24/05/2018 23/11/2018 100  
17 GSIDP/THAK/DW-8 Improvement of Gorlal Chowdhari Mondir,Under Dholarhat Union,Sadar Upazila. Latitude:26.12701, Longitude;88.8244. GSIDP thakurgaon-s 5.00   0.00 0  
18 GSIDP/THAK/DW-9 Improvement of Babuar Pukur Shashan Ghat Boundari wall,Under Ruhia Pashim Union,Sadar Upazila. Latitude:26.1709, Longitude ;88.4038. GSIDP thakurgaon-s 5.00   0.00 0  
19 GSIDP/THAK/DW-10 Improvement of Boundary Wall of Mohespur (Kalibari) Graveyard , Under Akhanagar Union,Sadar Upazila. Latitude:26.1459, Longitude;88.3603. GSIDP thakurgaon-s 5.00   0.00 0  
20 IRIDP-2/THAK/DW-8 (a) Improvement of Road By Bituminous Carpeting on Molani hat (RHD)-Ramnath GC Road via Akhanagar UP Office (Ch. 6800-7885m.) (b) Construction of 03 Nos 0.625x0.60m U-Type Culvert at ch. 6850m, 6990m & 7425m. IRIDP-2 thakurgaon-s 194943031 1.09 59.64 Md. Bozlur Rahman 49.51 25/01/2016 100 19/03/2019
21 IRIDP-2/THAK/DW-9 (a) Improvement of Road By Bituminus Carpating on Auliapur up-Sukhanpukur UP Road (Ch. 8218-8973m) (b) Construction of 01 Nos 0.625x0.60m U-Type Culvert at ch. 8425m IRIDP-2 thakurgaon-s 194943008 0.76 42.30 Md khairul Islam Roman 36.48 20/01/2019 100 19/03/2019
22 IRIDP-2/THAK/DW-10 (a) Improvement of Road By Bituminus Carpating on Goreya G.C-Zatibhanga hat via Sukhanpukhari UP Office Road (Ch. 0.00-1000m) (b) Construction of 04 Nos 0.625x0.60m U-Type Culvert at ch. 6880m,6950m,7543m & 7631m IRIDP-2 thakurgaon-s 194943018 1.00 57.89 Md. Abu Helal 49.76 05/01/2016 100 19/03/2019
23 IRIDP-2/THAK/DW-11 (a) Improvement of Road By Bituminous Carpeting on Salundar UP Office (Shingpara NHW)-Turukpathar hat Road.(Shingpara-Araji Matigara Road) ( ch. 0.00-1000m) (b) Construction of RCC Box Culvert 1.50mx1.00m at Ch. 13.00m (c) Construction of 01 Nos 0.625x0.60m U-Type Culvert at ch. 815.00m IRIDP-2 thakurgaon-s 194943016 1.00 61.95 Md. Jamal Hossain (T) 50.91 13/01/2016 100 19/03/2019
24 IRIDP-2/THAK/DW-12 Imprvement of Road By Bituminus Carpating from Bhelazan hat (RHD)-Chilarong UP Road.(ch. 1324-2324m) IRIDP-2 thakurgaon-s 194943003 1.00 54.98 Md. Bozlur Rahman 45.57 25/01/2016 100 19/03/2019
25 IRIDP-2/THAK/DW-13 (a) Improvement of Road By Bituminous Carpating on Chilarang UP Road - Chilarang Rail Line Ghunty Road (Ch. 2150-2990m) (b) Construction of 01 Nos 0.625x0.60m U-Type Culvert at ch. 2825m IRIDP-2 thakurgaon-s 194945132 0.84 47.85 Md. Bozlur Rahman 39.66 25/01/2016 100 19/03/2019
26 WNOBI-THA(BAL)-UZRU-62 Improvement of Kalomagh GC-Nekmord Hat via Bisharampur Road. Ch. 00+000km to Ch. 11+105km under Baliadangi Upazila, District: Thakurgaon. (ID No. 194082005) NOBIDEP baliadangi 194082005 11.11 0.00 0 837.58 Ram Babu-Hori Ram JV,Guduri Bazar, Thakurgaon. 698.84 31/07/2017 07/08/2017 28/01/2019 100 692.84 0 12/07/2020  
27 WNOBI-THA(BAL)-UZRU-58(B) Improvement of Lahiri GC - Ramnath GC via Chowrangi hat Road at Ch. 0+000km - 7+342km . under Baliadangi Upazila, District: Thakurgaon, (ID No. 194082004) NOBIDEP baliadangi 194082004 7.34 0.00 0 647.47 Ram Babu & Hari Ram(JV), Guduri Bazar, Thakurgaon 549.69 23/09/2015 01/10/2015 29/09/2016 100 544.01 0 12/07/2020  
28 WNOBI/THA/GC/129(A) Development of Lahirl GCGrowth Center Market at Upazila: Baliadangi, District: Thakurgaon NOBIDEP baliadangi   0.00 0 125.65 Md. Kamruzzaman, Baliadangi, Thakurgaon. 125.60 16/06/2016 23/06/2016 22/06/2017 100 125.27 0 12/07/2020  
29 WNOBI-THAKUR(BALI)-UZRR-GOB-4 Rehabilitation of Lahiri GC to Kalmegh GC via Dogachi Hat road at Ch. 00-3583m. ID No. 194082009. NOBIDEP baliadangi 194082009 3.58 0.00 0 110.68 M/S Islam Traders, Central Road, Ghope, Jessore. 99.18 21/08/2019 28/08/2019 19/05/2020 100 0.00 0 12/07/2020  
30 WNOBI-THA(HAR)-UNRU-106 Improvement of Bakua UP office to Chapdhahat road via Buzrok , singhari Road at Ch. 0+000km to 7+780km Under Haripur Up[azila, District: Thakurgaon(ID No.194513008) NOBIDEP haripur 194513008 7.78 0.00 0 540.84 M.H-RI(JV), Bazarpara, Thakurgaon 445.67 06/12/2016 13/12/2016 15/05/2019 100 443.49 0 12/07/2020  
31 WNOBI-THA(HAR)-UNRU-106 Improvement of Bakua UP office to Chapdhahat road via Buzrok , singhari Road at Ch. 0+000km to 7+780km Under Haripur Up[azila, District: Thakurgaon(ID No.194513008) NOBIDEP haripur 194513008 7.78 0.00 0 540.84 M.H-RI(JV), Bazarpara, Thakurgaon 445.67 06/12/2016 13/12/2016 15/05/2019 100 443.49 0 12/07/2020  
32 WNOBI/THA/GC/128(A) Development of Jadurani Growth Center Market(GCM) at Haripur, Dist: Thakurgaon NOBIDEP haripur   0.00 0 99.76 Hari Ram, Gudri Bazar, Thakurgaon 83.15 14/03/2016 21/03/2016 31/12/2017 100 76.95 0 12/07/2020  
33 WNOBI-THA(HAR)-UNRU-106 Improvement of Bakua UP office to Chapdhahat road via Buzrok , singhari Road at Ch. 0+000km to 7+780km Under Haripur Up[azila, District: Thakurgaon(ID No.194513008) NOBIDEP haripur 194513008 7.78 0.00 0 540.84 M.H-RI(JV), Bazarpara, Thakurgaon 445.67 06/12/2016 13/12/2016 15/05/2019 100 443.49 0 12/07/2020  
34 WNOBI-THA(HAR)-UNRU-106 Improvement of Bakua UP office to Chapdhahat road via Buzrok , singhari Road at Ch. 0+000km to 7+780km Under Haripur Up[azila, District: Thakurgaon(ID No.194513008) NOBIDEP haripur 194513008 7.78 0.00 0 540.84 M.H-RI(JV), Bazarpara, Thakurgaon 445.67 06/12/2016 13/12/2016 15/05/2019 100 443.49 0 12/07/2020  
35 WNOBI-THA(HAR)-UNRU-106 Improvement of Bakua UP office to Chapdhahat road via Buzrok , singhari Road at Ch. 0+000km to 7+780km Under Haripur Up[azila, District: Thakurgaon(ID No.194513008) NOBIDEP haripur 194513008 7.78 0.00 0 540.84 M.H-RI(JV), Bazarpara, Thakurgaon 445.67 06/12/2016 13/12/2016 15/05/2019 100 443.49 0 12/07/2020  
36 WNOBI-THA(HAR)-UNRU-106 Improvement of Bakua UP office to Chapdhahat road via Buzrok , singhari Road at Ch. 0+000km to 7+780km Under Haripur Up[azila, District: Thakurgaon(ID No.194513008) NOBIDEP haripur 194513008 7.78 0.00 0 540.84 M.H-RI(JV), Bazarpara, Thakurgaon 445.67 06/12/2016 13/12/2016 15/05/2019 100 443.49 0 12/07/2020  
37 WNOBI-THA(HAR)-UNRU-106-B Construction of 33m Long RCC Girder Bridge on Bakua UP office - chapdahat road via Buzrok, singhari over Jamuna Khal. at Ch.03+092km Under Haripur Upazila, District: Thakurgaon. (Road ID No.194513008) NOBIDEP haripur 194513008 33.00 0 175.64 Hari Ram, Gudri Bazar, Thakurgaon. 147.28 06/12/2016 13/12/2016 12/12/2017 100 147.03 0 12/07/2020  
38 WNOBI-THA(PIR)-UZRU-59(A) Improvement of Nakkatihat GC - Sinua RHD Road at Ch. 0+444 to 2+190 km. under Pirganj Upazila, District:Thakurgaon Road ID. 194822007 NOBIDEP pirganj 194822007 1.75 0.00 0 178.91 M/S. Rolex Construction, Guptapara, Rangpur. 163.57 12/07/2015 20/07/2015 19/07/2016 100 163.56 0 12/07/2020  
39 WNOBI/THA/ GC/128(B) Development of Growth Center Market(GCM) at Jabor Hat Upazila: Pirganj, District: Thakurgaon NOBIDEP pirganj   0.00 0 79.93 SMA Moin, Thakurgaon road, Thakurgaon 62.66 20/01/2016 27/01/2016 26/01/2017 100 60.19 0 12/07/2020  
40 WNOBI-THAKUR(PIR)-UZRR-GOB-8 Rehabilitation of jaborhat GC to Narabari GC (Birol) via Ranirghat road at Ch. 7150-10225m. ID No. 194822010. NOBIDEP pirganj 194822010 3.08 0.00 0 126.16 M.A. Mukta Sarkar, Thakurgaon Sadar, Thakurgaon. 100.61 28/08/2019 04/09/2019 24/05/2020 100 0.00 0 12/07/2020  
41 WNOBI-THAKUR(PIR)-UZRR-GOB-9 Rehabilitation of Jaborhat GC to Narabari GC (Birol) via Ranirghat road at Ch. 10225-14800m. ID No. 194822010. NOBIDEP pirganj 194822010 4.58 0.00 0 410.26 Ram Babu, Guduri Bazar, Thakurgaon. 325.00 14/08/2019 21/08/2019 20/08/2020 80 0.00 0 12/07/2020  
42 WNOBI-THAKUR(PIR)-UZRR-GOB-7 Rehabilitation of jaborhat GC to Narabari GC (Birol) via Ranirghat road at Ch. 00-7150m. ID No. 194822010. NOBIDEP pirganj 194822010 7.15 0.00 0 384.22 B & S JV, College Road, Thakurgaon. 383.97 11/07/2019 18/07/2019 17/07/2020 75 0.00 0 12/07/2020  
43 WNOBI-PIRG(THAKUR)-P/III(4) a)Construction of Drain from Pirganj Birholy to Lachchi river via RDRS more. Ch. 0+050 to 0+606 km. ID. No. DS-127128035. b)Improvement of road from Birganj road Ashraf chowdhury house of ward no. 7 Ch. 0+000 to 0+300 km. c)Improvement of foothpath by con NOBIDEP pirganj   0.00 0 159.43 Md. Habibur Rahman, Mushidhat, Setabgonj, Bochagonj, Dinajpur. 158.32 10/06/2019 08/03/2020 100 157.51 0 12/07/2020 Pourashava Infrastructure
44 WNOBI-PIRG(THAKUR)-P/II(1) A) Rehab. of Road From 1 No. Ward Mitrabati Setabganj Road to Kazi Nazrul Islam Road, (Ch. 0+000 km to Ch. 1+325km) [SR-194827015] B) Rehab. of Road from Jogtha Station Road to MP Para, ( Ch. 0+000km to Ch. 1+350km) SR-194827015 C) Rehabilitation of Road NOBIDEP pirganj   6.61 0.00 0 349.34 KE-AC(JV), Bochagonj, Dinajpur 324.59 29/06/2017 03/07/2017 03/07/2018 100 324.14 0 12/07/2020 Pourashava Infrastructure
45 WNOBI-PIRG(THAKUR)-P/III-(2) Improvement of 4 Slum Area, (Khogen, Khalpara, Porkhoya, Hatathpara) and Rickshaw Van, Waste Collection Pit, Pirganj.Upazila: Pirganj District: Thakurgaon. NOBIDEP pirganj   0.00 0 197.97 S.M.A. Moin, Thakurgaon Road, Thakurgaon. 160.93 20/09/2018 07/01/2020 97 116.01 0 12/07/2020 Pourashava Infrastructure
46 WNOBI-PIRG(THAKUR)-P/III(3) Improvement of 2 Junction areas (Pourashava mour & Bus Stand Porbo Chowrasta mour) and Shahid Ishak Ali Road from East Chowrasta to Pallibidyut mour Under Pirganj Pourashava, District: Thakurgaon. NOBIDEP pirganj   0.00 0 234.30 M/S Rolex Construction, Propiter: Md. Anwarul Islam Rolex, Munshipara, Rangpur. 203.42 16/06/2018 29/02/2020 87 165.81 0 12/07/2020 Pourashava Infrastructure
47 WNOBI-PIRG(THAKUR)-P/III(1) Construction of 3 Storied Pirganj Poura Supur Market. NOBIDEP pirganj   0.00 0 414.45 Md. Khairul kabir Rana, S.M.C road, Guptapara, Rangpur. 414.25 24/04/2018 05/01/2020 100 340.04 0 12/07/2020 Pourashava Infrastructure
48 WNOBI-PIRG(THAKUR)-P/II(3) Construction of RCC Drain from a) Banglalink tower to Jogtha Pachim chowrasta (925m) Ch.0+000 to Ch.0+925km ID-DR-194829020 and b) Jogtha Pachim chowrasta to Lacchi nadi (590m) Ch.0+00 to Ch.0+605km ID-DR-194829025 NOBIDEP pirganj   1530.00 0.00 0 288.58 M. Ehteshamul Haque, Jail Road, Sadar, Dinajpur 215.71 18/12/2017 08/07/2019 97 184.81 0 12/07/2020 Pourashava Infrastructure
49 WNOBI-PIRG(THAKUR)-P/1(1) (A) Rehabilitation of Raghunathpur Bangabandhu Road Ramananda miil to Kazi Nazrul Islam Road Via south Eidgah Math road(Ch. 0+000-0+678km). ID-LR-194828040 (B) Improvement of Pirgonj Setabganj road to West College bazar Jame Mosque road (Ch.0+000-0+21 NOBIDEP pirganj   3.60 0.00 0 305.77 KE-AC (JV) Setabganj, Dinajpur. Mobile: 01713760506 250.58 22/06/2015 28/06/2015 28/06/2016 100 248.64 0 12/07/2020 Pourashava Infrastructure
50 WNOBI-THAKUR(RANI)-UZRR-GOB-6 Rehabilitation of Ranisankail H/Q to Katiharhat GC road at Ch. 2500-5420m. ID No. 194862001. NOBIDEP pirganj 194862001 2.92 272.24 Ram Babu, Guduri Bazar, Thakurgaon. 0.00 0 27/08/2019
51 WNOBI-THA(RANL)-UZRU-59(B) Improvement of Nekmord College R&H to Moharaja GC Road. Ch. 1+000 to 5+390Km. under Ranisankail Upazila, District: Thakurgaon, (ID No. 194862008) NOBIDEP ranisankail 194862008 4.39 0.00 0 601.33 Ram Babu, Goudri Bazar, Thakurgaon 505.01 05/08/2015 12/08/2015 31/12/2017 100 486.62 0 12/07/2020  
52 WNOBI-THA(RAN)-UNRU-131 Improvement of Kahipur UP Chowrasta-Hatpukur Near 100m Bridge via Dholpukurhat Road. Ch. 0+000km. to Ch. 4+853km [Ecluded Part-Ch. 0+262.65km to Ch. 0+442.65km] Under Ranisankail Upazila, District: Thakurgaon. (Road ID No. 194863004). NOBIDEP ranisankail 194863004 4.67 0.00 0 337.17 Md. Jamal Hossain, N.C Road, Thakurgaon 287.10 13/05/2018 20/05/2018 19/05/2019 100 286.93 0 12/07/2020  
53 WNOBI-THAKUR(RANI)-UZRR-GOB-5 Rehabilitation of Ranisankail H/Q to Katiharhat GC road at Ch. 00-2500m. ID No. 194862001. NOBIDEP ranisankail 194862001 2.50 0.00 0 222.74 Md. Aynul Haque, Kalibari, Thakurgaon. 222.34 10/07/2019 17/07/2019 16/07/2020 85 0.00 0 12/07/2020  
54 WNOBI-RANIS(THAKUR)-P/II(1) A) Rehabilitation of Road From Diabetics Hospital Road to Horipur Road via Rangpuria Market, Dakhil Madrasha & Kathaidangi Road, (Ch. 0+000 km to Ch. 2+375km) (SR- 194867011) B) Rehabilitation of Road from 3 No. Hosengaon Union Daibetics Hospital Morr (Ka NOBIDEP ranisankail   6.37 0.00 0 306.37 M/S Mirza construction, Proprietor. Mirza Md. Saiful Islm, J.C. Road-Dhanbandhi, Sirajganj 290.70 06/09/2017 12/09/2017 31/03/2019 100 261.76 0 12/07/2020 Pourashava Infrastructure
55 WNOBI-RANIS(THAKUR)-P/1(1) (A) Rehabilitation of Ranisankiail - Pirganj Road Abad Takia Madrasha more to Pilot School Road via Joykali hat road.(Ch. 0+207-0+700km) ID-SR-194867026 & ID-SR-194867036 (B) Improvement of Dabtali more to Mill of Anamul via Kali mondhir (union Connectin NOBIDEP ranisankail   3.58 0.00 0 224.03 Md.Deloar Hossain & M.H Corporation (JV) , Boda, Panchagarh. Mob: 01740624180, 01720121327 193.65 23/06/2015 29/06/2015 21/06/2016 100 192.03 0 12/07/2020 Pourashava Infrastructure
56 WNOBI-RANIS(THAKUR)-P/II(2) (A) Construction of RCC Drain with cover Slab from 1 No. Ward in front of Mukta Cinema Hall to Kulki River via Chowrasta Morre (345m). Ch. 0+000 to 0+345km. (ID No.: D- 194869005,07,17,18) NOBIDEP ranisankail   345.00 0.00 0 45.84 S.M.A Moin, Thakurgaon road, Sadar, Thakurgaon. 35.87 16/05/2018 22/05/2018 20/05/2019 90 11.49 0 12/07/2020 Pourashava Infrastructure
57 WNOBI-RANIS(THAKUR)-P/III(4) Junction Improvement for Ranisankail Pourashava Under Thakurgaon District. NOBIDEP ranisankail   0.00 0 244.37 Md. Mahibul Islam, Birol, Dinajpur. 213.34 01/11/2018 07/11/2018 07/11/2019 55 95.87 0 12/07/2020 Pourashava Infrastructure
58 WNOBI-RANIS(THAKUR)-P/III-DR(1) (a) Constructin of RCC Master Drain with footpath from Shibdighi mour to Mukta Cinema Hall via Ranisankail Degree College, Ch. 0+00 km to 0+657km (657m), Upazila: Ranisankail, District: Thakurgaon. (b) Constructin of RCC Drain from Ranisankail Degree C NOBIDEP ranisankail   0.75 0.00 0 198.68 MH Corporation & Md. Deloar Hossain JV, Upazila: Boda, District: Panchagarh. 161.48 15/04/2018 21/03/2018 19/04/2019 100 129.98 0 12/07/2020 Pourashava Infrastructure
59 WNOBI-RANIS(THAKUR)-P/III-(5) a)Rehabilitation of Road from karim Store to Joinal Store via Nazmul House. (Ch. 0+00 to 0+800km). LR-194868099,50,71,19 b)Rehabilitation of Road from House of Jillu Biswas to public Labrary.(ch.0+00 to 0+220 km).LR-194868034 c)Rehabilitation of Road from NOBIDEP ranisankail   2.28 0.00 0 123.06 S M A. Moin, Thakurgaon road, Sadar,Thakurgaon. Cell: 01710215112 111.40 12/05/2019 12/05/2020 92 89.97 0 12/07/2020 Pourashava Infrastructure
60 WNOBI-RANIS(THAKUR)-P/III(3) Improvement of 3 slum area (Adibashipara, Jugipara, Purbo Dashpara) Ranisankail Pourashava, District: Thakurgaon. NOBIDEP ranisankail   0.00 0 85.59 M.H Corporation, Pro: Md. Mostak Ahmed, Upazila: Boda, District: Panchagarh. 69.10 08/05/2018 14/05/2018 12/05/2019 92 49.15 0 12/07/2020 Pourashava Infrastructure
61 WNOBI-RANIS(THAKUR)-P/III-PR(1) a)Rehablitation of road from Chadni (main road) to south Rangpuriya market near house of Musa and Bashjhar of Makaram house to Mosque of Thofa (link road) Ch. 0+000 km to 0+790 km (Road ID: LR-194868017, 020). b)Rehablitation of road from 03 no. ward Kase NOBIDEP ranisankail   1.95 0.00 0 91.94 M.H Corporation, Pro: Md. Mostak Ahmed, Upazila: Boda, District: Panchagarh. 91.40 02/05/2018 08/05/2018 06/05/2019 100 91.25 0 12/07/2020 Pourashava Infrastructure
62 WNOBI-THAKUR(RANI)-UZRR-GOB-6 Rehabilitation of Ranisankail H/Q to Katiharhat GC road at Ch. 2500-5420m. ID No. 194862001. NOBIDEP ranisankail 194862001 2.92 0.00 0 272.25 Ram Babu, Guduri Bazar, Thakurgaon. 272.18 03/07/2019 10/07/2019 09/07/2020 100 0.00 0 12/07/2020  
63 WNOBI-THA(SAD)-UZRU-58(A) Improvement of Parpugi RHD to Neckmorad GC road Ch. 0+000 to 4+210 km. under Sadar Upazila, District: Thakurgaon. (ID No. 194942015) NOBIDEP thakurgaon-s 194942015 4.21 0.00 0 631.83 Ram Babu,Gudribazar, Thakurgaon. 523.95 26/08/2015 01/09/2015 15/08/2017 100 522.30 0 12/07/2020  
64 WNOBI/THA/GC/129(B) Development of Shibganj Growth Center Market(GCM) at Upazila Sadar, District: Thakurgaon NOBIDEP thakurgaon-s   0.00 0 112.83 M/S Sohel Enterprise, Kalibari, Thakurgaon 112.48 10/04/2016 17/04/2016 16/04/2017 100 111.71 0 12/07/2020  
65 CW-54.a/RCIP/TKG 1.Improvement of Baliadangi-Lahiri G.C. Road (Road ID194082001, Upazila: Baliadangi , District: Thakurgaon ) 2. Improvement of Charol UP Office(Lahiri GC)-Dogachi hat via Patilabhasha Road (Road ID194083011, Upazila: Baliadangi, District: Thakurgaon) RCIP baliadangi 194082001 15.43 0.00 91 2139.97 Md. Mejanur Rahman, Bhotergati, Jhenaidah 1973.69 07/07/2020 21/07/2020 27/10/2022 93 1792.33 91 05/01/2023 Carpeting Ongoing
66 CW-19.b/RCIP/TKG 1. Improvement of Lahiri G.C-Fakirganj. G C. Road (Road ID194082007, Upazila: Baliadangi, District: Thakurgaon ) 2. Improvement of Baliadangi-DhirgonJ G.C .via Badambarihat Road (Road ID194082006, Upazila: Baliadangi, District: Thakurgaon) RCIP baliadangi 194082007 21.31 0.00 91 2292.33 DON Enterprise-RAM Babu-JV, Gudri Bazar, Sadar, Thakurgaon 2217.42 23/03/2021 23/03/2021 12/09/2022 95 2010.79 91 05/01/2023  
67 CW-54.b/RCIP/TKG 1. Improvement of Jadurani GC-Dangipara UP Office Road. (Road ID194513004, Upazila: Haripur, District: Thakurgaon) RCIP haripur 194513004 4.28 0.00 87 552.16 Md. Jamal Hossain, North Circular Road, Thakurgaon, 01714-051762 437.00 25/07/2021 08/08/2021 06/02/2023 95 377.55 87 05/01/2023  
68 CW-54.d/RCIP/TKG 1. Improvement of Pirganj-Nasibganj G.C Road (Road ID194822001, Upazila: Pirganj, District: Thakurgaon ) 2. Improvement of Baliadangi GC - Dhirganj (Horipur) via Dharmogarh Check Post Road. (Road ID194862007, Upazila: Ranisankail, District: Thakurgaon ) RCIP pirganj   12.98 0.00 17 1439.00 Masud Hi-tech Engineering Ltd. Parvez construction Limited (JV) 1189.00 22/09/2021 06/10/2021 06/04/2023 29 201.67 17 05/01/2023  
69 CW-54.c/RCIP/TKG 1. Improvement of Thakurgaon-Farabari GC Road. (Road ID194942005, Upazila: Thakurgaon-S, District: Thakurgaon ) RCIP thakurgaon-s 194942005 8.50 0.00 84 1202.18 DE-RE-JV, Gudri Bazar, Thakurgaon-5100, Thakurgaon Pourasova, Sadar, Thakurgaon. 1015.05 07/07/2020 21/07/2020 05/06/2022 100 852.37 84 05/01/2023 Work Completed
70 CW-19.a/RCIP/TKG 1.Improvement of Bhawlar hat GC-Bhelazan RHD Road. (Road ID194942011, Upazila: Thakurgaon-S, District: Thakurgaon ) 2. Improvement of Barabari UP Office (Dangi)-Noyar hat via Jorkali Madhupur Road (Road ID194083004, Upazila: Baliadangi, District: Thakurgaon) RCIP thakurgaon-s 194942011 14.90 0.00 79 1848.43 M/S. Kohinoor Enterprise, Dadpur Lodge, Kawnia Line, Sadar, Barishal 1818.40 25/03/2020 08/04/2020 14/09/2022 85 1438.69 79 05/01/2023  
71 RDRIIP/THA/ UZ-018 Improvement of Lahiri GC - Kalmegh GC Via Dogachi Hat Road (Ch. 6979-7979m). RDRIIP baliadangi 1.00 73.18 Md. Tozammel Haque, Baliadangi, Thakurgaon. 60.01 12/10/2014 18/10/2015 100  
72 RDRIIP/THA/ UZ-019 Improvement of Lahiri GC - Kalmegh GC Via Dogachi Hat Road (Ch. 7979-9479m). RDRIIP baliadangi 1.50 110.34 Md. Abdul Gofur, Baliadangi, Thakurgaon. 86.07 12/10/2014 18/10/2015 100  
73 RDRIIP/THA/ UZ-020 Improvement of Kalmegh GC -Neckmord Hat via Bishrampur Road (Ch. 2662-4162m). RDRIIP baliadangi 1.50 101.45 Md. Abdul Gofur, Baliadangi, Thakurgaon. 79.91 12/10/2014 18/01/2016 100  
74 RDRIIP/THA/ UZ-076 Improvement of Lahiri G.C – Horinmari GC via Paria hat Road (Ch. 5970-6970m). RDRIIP baliadangi 1.00 73.76 Md. Abdul Aziz, Ranisankail, Thakurgaon. 61.03 30/09/2015 06/10/2016 100  
75 RDRIIP/THA/ UZ-085 Improvement of Lahiri G.C – Horinmari GC via Paria hat Road (Ch. 6970-7970m). RDRIIP baliadangi 1.00 80.84 Md. Abdul Gofur, Baliadangi, Thakurgaon. 69.96 14/03/2016 20/03/2017 100  
76 RDRIIP/THA/ UZ-091 Improvement of Lahri GC-Horinmari GC Via Paria hat Road at Ch. 7970-8940m under Baliadangi Upazila, Dist.Thakurgaon (ID No. 194082003). RDRIIP baliadangi 0.97 88.54 M/S Richi Enterprise Kalibari, Thakurgaon 88.44 26/06/2016 01/07/2017 100  
77 RDRIIP/THA/UZ-104 Improvement of Baliadangi-Dhirgonj GC via Badambarihat Road at ch.11575-12075m RDRIIP baliadangi 0.50 34.79 M/S Risha Enterprise Baliadangi, Thakurgaon 33.99 18/06/2017 19/06/2018 100  
78 RDRIIP/THA/ UN-002 Improvement of Paria UP Office (Paria hat - Ranbag) –Futanir hat via Lohagara hat Road (Ch. 00-1000m). RDRIIP baliadangi 1.00 61.47 Md. Rajab Ali, Hazipara, Thakurgaon. 52.49 23/04/2014 28/04/2015 100  
79 RDRIIP/THA/ UN-050 Improvement of Boter Hat -Charol UP Office (Lahiri GC) via Chatta Lahiri Dhakil Madrasha Road (Ch. 00-1000m). RDRIIP baliadangi 1.00 55.21 Md. Anamul Haque, Thakurgaon Road, Thakurgaon. 43.67 12/10/2014 18/10/2015 100  
80 RDRIIP/THA/UN-298 Improvement of Badambari hat-Amjankhore UP Office (School hat) via Kanchir hat Road at ch.10720-11220m RDRIIP baliadangi 0.50 28.66 M/s Ranco Traders Ashrampara, Thakurgaon 28.00 05/06/2017 05/06/2018 100  
81 RDRIIP/THA/UN-299 Improvement of Badambari hat-Amjankhore UP Office (School hat)-B.D.R (Mondumala) hat via Surma hat Road at ch.00-500m RDRIIP baliadangi 0.50 0.00 Md. Abu Helal, Ghoshpara, Thakurgaon. 23.89 100  
82 RDRIIP/THA/ VR-009 Improvement of Lahiri G.C - Futanir Hat Via Bottali & Grampara Road (Ch. 00-800m). RDRIIP baliadangi 0.80 45.66 Md. Rajab Ali Hazipara, Thakurgaon 38.24 23/04/2014 28/04/2015 100  
83 RDRIIP/THA/ VR-171 Improvement of Paria UP Office (Pariahat-Ranbag)-Futanir hat via Lohagara hat Road (Ch.2432-3432m) RDRIIP baliadangi 1.00 52.60 Md. Abdul Gafur, Baliadangil, Thakurgaon. 52.49 25/10/2015 24/08/2016 100  
84 RDRIIP/THA/ VR-217 Improvement of Lahiri G.C - Futanir Hat Via Bottali & Grampara Road (Ch. 800-1000m). RDRIIP baliadangi 1.00 50.65 Md. Rajab Ali Hazipara, Thakurgaon 42.04 30/09/2015 21/08/2016 100  
85 RDRIIP/THA/ VR-229 Improvement of Lahiri GC – Futanir hat Via Bottali & Grampara road at ch.(1800-2800m) RDRIIP baliadangi 4.50 56.18 Md, Rajab Ali, Hazipara, Thakurgaon 46.40 20/01/2016 26/01/2016 100  
86 RDRIIP/THA/ VR-293 Improvement of Lahri GC-Futanir hat via Bottali & Grampara Road at Ch. 2800-4120m RDRIIP baliadangi 1.32 73.49 Hariram, Guduribazar, Thakurgaon 73.48 19/06/2016 25/06/2017 100  
87 RDRIIP/THA/ VR-359 Improvement of Laxmidangi Dholabasti-Thokbosti Road at ch 00-1000m RDRIIP baliadangi 1.00 59.89 Md. Murad Hossain, Bazarpara,Thakurgaon. 50.61 29/10/2016 05/10/2017 100  
88 RDRIIP/THA/ VR-360 Improvement of Moharajpur-Nagor vita via Roton Dhighi Road at ch 927-2127m RDRIIP baliadangi 1.20 64.86 Md. Murad Hossain, Bazarpara,Thakurgaon. 54.48 29/10/2016 05/10/2017 100  
89 RDRIIP/THA/ VR-364 Improvement of Dogachihat-Khalipur Pukurpara via Khalipur Road at ch 878-2878m RDRIIP baliadangi 2.00 117.19 A.H.M Sadequl Islam Ashramoara, Thakurgaon 97.24 08/11/2016 14/11/2017 100  
90 RDRIIP/THA/VR-416 Improvement of Boglabari-Mondumala via Coat para Road at Ch. 00-500m RDRIIP baliadangi 0.50 28.73 Md. Abu Halal, Goshpara, Thakurgaon. 26.64 17/05/2017 22/05/2018 100  
91 RDRIIP/THA/VR-417 Improvement of Laxmi dangi Dholai bosti-Thok bosti Road at Ch. 1000-1500m RDRIIP baliadangi 0.50 0.00 Ram Babu Goduri Bazar Thakurgaon. 32.82 17/05/2017 22/05/2018 100  
92 RDRIIP/THA/VR-418 Improvement of Peaz pukur-Bangrol jia bari via Madhobpur Govt.Pry.School Road at Ch. 00-500m RDRIIP baliadangi 0.50 29.61 M/s Risha Enterprise Balidangi, Thakurgaon. 26.65 21/05/2017 27/05/2018 100  
93 RDRIIP/THA/VR-419 Improvement of Dangi-Jaunia via Paschim goalkari G.P.S Road at Ch. 1500-2000m RDRIIP baliadangi 5.00 28.08 M/s Risha Enterprise Balidangi, Thakurgaon. 26.45 21/05/2017 27/05/2018 100  
94 RDRIIP/THA/VR-420 Improvement of Kasibari-Moradhar Road at Ch. 00-500m RDRIIP baliadangi 0.50 33.50 Md. Abu Halal, Goshpara, Thakurgaon. 31.10 17/05/2017 08/05/2018 100  
95 RDRIIP/THA/VR-517 Improvement of Dharia Bosti-Belshara Furkania Madrasha Road at ch. 380-980m RDRIIP baliadangi 0.60 0.00 Md. Abu Halal, Goshpara, Thakurgaon. 36.70 100  
96 RDRIIP/THA/VR-518 Improvement of Januia -Shahabazpur-Poschimpara via Shahabazpur GPS Road at ch. 00-500m RDRIIP baliadangi 0.50 30.32 M/s Renco Trader's, Ashramoara, Thakurgaon 27.81 07/06/2017 07/06/2018 100  
97 RDRIIP/THA/VR-519 Improvement of Baliapukur-Amtola via Janta saw mill Road at ch. 380-880m RDRIIP baliadangi 0.50 26.15 Md. Haider Ali,Ashrompara Thakurgaon 23.54 15/06/2017 17/06/2018 100  
98 RDRIIP/THA/VR-520 Improvement of Bhanor Dhonibosti BDR mara more-Shaptir hat via Dalimpara Road at ch. 00-500m RDRIIP baliadangi 0.50 27.71 Provat kumar Ray Balidangi, Thakurgaon. 24.94 11/06/2017 11/06/2018 100  
99 RDRIIP/THA/VR-521 Improvement of Nagorvita-Mymensingh para via Masaldangi Road at ch. 00-500m RDRIIP baliadangi 0.50 31.34 M/s Risha Enterprise Balidangi, Thakurgaon. 31.34 18/06/2017 19/06/2018 100  
100 RDRIIP/THA/VR-411 Improvement of Baliadangi-Gandigari Telipara via Amtola GPS Road at ch. 00-500m RDRIIP baliadangi 0.50 0.00 Provat kumar Ray Balidangi, Thakurgaon. 30.21 10/06/2017 11/06/2018 100  
101 RDRIIP/THA/VR-413 Improvement of Sarbomongla - Hauda via Taraute Road at ch. 3318-4318m RDRIIP baliadangi 1.00 61.03 Md Belal Hossain, College Road, Thakurgaon. 59.34 14/06/2017 15/06/2018 100  
102 RDRIIP/THA/VR-410 Improvement of Kushaldangi hat-Kashuakhademgonj hat via Barapalashbari Madrasha Road at ch. 3318-3818m RDRIIP baliadangi 0.50 0.00 Md. Abu Halal, Goshpara, Thakurgaon. 31.58 100  
103 RDRIIP/THA/VR-412 Improvement of Duo Suo Neyar hat-Alakchipi via chagoldangi RNGPS Road at ch. 1520-2020m RDRIIP baliadangi 0.50 31.79 Md. Aminul Islam Balidangi, Thakurgaon. 28.61 100  
104 RDRIIP/THA/ BR-003 Construction of 63.00m Long RCC Girder Bridge over Tirnal River on Lahiri GC – Kalmegh GC via Dogachi Hat road at Ch.3370.00m. RDRIIP baliadangi 63.00 248.11 Md. Nurul Islam, Balubari, Dinajpur. 230.12 23/12/2014 31/03/2016 100  
105 RDRIIP/THA/ BR-008 Construction of 34.00m Long RCC Girder Bridge over Nohona River on Baliadangi Lahiri GC road at Ch.4516m. RDRIIP baliadangi 34.00 181.80 Md. Khairul kabir Rana, SMC Road, Guptapara, Rangpur. 152.16 14/03/2016 20/03/2017 100  
106 RDRIIP/THA/BR-032 Construction of 69.05m Long RCC Girder Bridge Over Timai River on Baliadangi -Lahiri GC Road at ch.905. RDRIIP baliadangi 69.05 325.48 Ram Babu, Guduribazar, Thakurgaon 292.93 08/06/2017 09/06/2018 100  
107 RDRIIP/THA/BR-004 Construction of 90.00m Long RCC Girder Bridge over Tirnai River on Barapolashbari Alim Madrasha - Lakshampara & Chikonmati Village Road at Ch.36.00m. RDRIIP baliadangi 90.00 467.51 HoriRam, Guduribazar, Thakurgaon 392.34 20/01/2016 26/01/2017 100  
108 RDRIIP/THA/M-051 Maintenance of Baliadangi Dangi-Horinmary GC via Adhardigi hat Road ch. 00-9036m. RDRIIP baliadangi 9.04 133.57 Ram Babu,Guduri Bazar,Thakurgaon 120.22 10/10/2017 16/10/2018 100  
109 RDRIIP/THA/ TR-012 Tree Plantation work on Paria UP office (Paria Hat) Futanir Hat via Lohagara Hat road.(Ch.00-1000m).(effective length=1000m). RDRIIP baliadangi 1.00 1.50 LCS women 1.50 15/09/2014 14/09/2016 100  
110 RDRIIP/THA/ TR-013 Tree Plantation work on Lahiri GC – Futanir Hat via Botali & Grampara road. (Ch.00-100m).(effective length=800m). RDRIIP baliadangi 0.80 1.43 LCS women 1.43 15/09/2014 14/09/2016 100  
111 RDRIIP/THA/ TR-039 Tree Plantation work on Kalmegh GC – -Nekmord hat via Bishrampur road (Ch.2662-4162m).(effective length=1412m). RDRIIP baliadangi 1.41 1.80 LCS women 1.80 01/10/2016 30/07/2017 100  
112 RDRIIP/THA/ UN-001 Improvement of Horipur UP Office - Dhirgonj GC Road (Ch. 00-1000m). RDRIIP haripur 1.00 53.20 Md. Rajab Ali, Hazipara, Thakurgaon. 45.97 08/09/2014 14/09/2015 100  
113 RDRIIP/THA/ UN-048 Improvement of Horipur UP Office -Dhirganj GC Road (Ch. 2000-3500m). RDRIIP haripur 1.50 83.32 Md. Rajab Ali, Hazipara, Thakurgaon. 68.99 24/09/2014 30/12/2015 100  
114 RDRIIP/THA/ UN-049 Improvement of Horipur UP Office -Dhirganj GC Road (Ch. 1000-2000m). RDRIIP haripur 1.00 51.99 Md. Rajab Ali, Hazipara, Thakurgaon. 43.05 24/09/2014 30/09/2015 100  
115 RDRIIP/THA/ UN-184 Improvement of Haripur UP Office-Torrahat Road via Tinua Minapur road (CH: 1080-4080m) RDRIIP haripur 3.00 175.04 Md, Abdul quddus, kaiibari, Thakurgaon 148.56 25/01/2016 30/01/2017 100  
116 RDRIIP/THA/UN-300 Improvement of Haripur UP Office-Dhirganj GC Road at Ch. 4230-4730m RDRIIP haripur 0.50 27.90 Md. Hamidur Rahman, Haripur, Thakurgaon 25.11 22/05/2017 28/05/2018 100  
117 RDRIIP/THA/ VR-005 Improvement of Kathaldangi GC - Kulik River Road (Ch. 00-500m). RDRIIP haripur 0.50 26.72 M/S Swapon Enterprise, Ranisankail, Thakurgaon. 22.18 18/09/2014 24/06/2015 100  
118 RDRIIP/THA/ VR-067 Improvement of Jamunhat - Medinisagor Road (Ch. 00-700m). RDRIIP haripur 0.70 39.27 Md. Abdul Aziz, Ranisankail, Thakurgaon. 32.01 12/10/2014 18/10/2015 100  
119 RDRIIP/THA/ UZ-012 Improvement of Gonirhat R&H – Katiher hat GC Road (Ch. 1000-2000m). RDRIIP pirganj 1.00 66.72 Md. Abu Siddique Tota, Kalibari, Thakurgaon. 57.87 08/09/2014 14/09/2015 100  
120 RDRIIP/THA/ UZ-013 Improvement of Gonirhat R&H – Katiher hat GC Road (Ch. 00-1000m). RDRIIP pirganj 1.00 66.35 Md. Abu Siddique Tota, Kalibari, Thakurgaon. 57.25 08/09/2014 14/09/2015 100  
121 RDRIIP/THA/ UZ-014 Improvement of Jaborhat GC - Narabari GC (Birol) via Ranirghat Road (Ch. 8910-10410m). RDRIIP pirganj 1.50 102.45 M/S Rolex Construction, Goptapara, Rangpur. 89.40 16/09/2014 21/12/2015 100  
122 RDRIIP/THA/ UZ-015 Improvement of Jaborhat GC - Narabari GC (Birol) via Ranirghat Road (Ch. 7410-8910m). RDRIIP pirganj 1.50 104.38 A.H.M Sadequl Islam Ashrompara, Thakurgaon. 90.80 08/09/2014 14/12/2015 100  
123 RDRIIP/THA/UN-176 Improvement of Bhomradaha UP-Sinuahat Road (CH: 850-1850m) RDRIIP pirganj 1.00 59.49 Md, Abdul Aziz, Ranisankail, Thakurgaon 47.61 27/01/2016 02/02/2017 100  
124 RDRIIP/THA/UN-175 Improvement of Hajipur UP-Birashir hat Via khotsings hat & shindagar Road (CH: 1750-2750m) RDRIIP pirganj 1.00 53.72 M/S Sahajahan Traders, Pirganj, Thakurgaon 43.46 25/01/2016 30/01/2017 100  
125 RDRIIP/THA/UN-280 Improvement of Saidpur UP (Kalopir Pucca Road)-Danarhat Road at ch 2930-3930m RDRIIP pirganj 1.00 59.96 Md. Tozamal Haque, Baliadangi, Thakurgaon 49.00 06/11/2016 12/11/2017 100  
126 RDRIIP/THA/UN-301 Improvement of Jaborhat UP-Ronashiahat via Malancha, Bridhigaon Road at Ch. 1000-2000m RDRIIP pirganj 1.00 59.23 Md. Sadaqul Islam, Ashrampara, Thakurgaon 57.43 31/05/2016 06/06/2018 100  
127 RDRIIP/THA/UN-335 Improvement of Sengaon UP Office-JaborhatGC via Nashibganj GC ,Bolaihat,Tamlai Dighi Road ch. 11400-12400m RDRIIP pirganj 1.00 56.11 M/s Khan Enterprtise, Satabgonj, Dinajpur 54.82 19/06/2017 25/06/2018 100  
128 RDRIIP/THA/ VR-006 Improvement of Thakurgaon R&H (Tetultala) - Khangaon Road (Ch. 2450-3250m). RDRIIP pirganj 0.80 41.35 Md. Rajab Ali 35.07 23/04/2014 28/04/2015 100  
129 RDRIIP/THA/ VR-060 Improvement of Godargari hat - Ronasia Club hat (Danazpur) Road (Ch. 2800-3300m). RDRIIP pirganj 0.50 26.00 M/S Rolex Construction, Goptapara, Rangpur. 22.64 16/09/2014 21/06/2015 100  
130 RDRIIP/THA/ VR-061 Improvement of Pirganj - Vabnaganj Hat - Thakurgaon Sadar Sialdanga Hat Road (Ch. 500-1000m). RDRIIP pirganj 0.50 25.76 M/S Rolex Construction, Goptapara, Rangpur. 22.42 16/09/2014 21/06/2015 100  
131 RDRIIP/THA/ VR-272 Improvement of Madhobpur More To Sirail Via Birdohi Village Road at (Ch.00m-2500m) . RDRIIP pirganj 2.50 141.11 M/s Mamun Traders Muktapur, Rajshahi 121.25 18/04/2016 25/04/2016 100  
132 RDRIIP/THA/ VR-273 Improvement of Thumnia Hadayetullah Chairman House-Raniganj UZR Via Vobanipur Road at (Ch.00m-2000m). RDRIIP pirganj 2.00 125.11 M/s Ranco Traders Ashrampara, Thakurgaon 125.11 24/04/2016 02/05/2017 100  
133 RDRIIP/THA/ VR-274 Improvement of Bonbari R&H-Elarhat via Shimulbar Road at Ch.00-500m. RDRIIP pirganj 0.50 30.19 S.M Raza, Thakurgaon Road, Thakurgaon 26.72 27/04/2016 03/05/2017 100  
134 RDRIIP/THA/ VR-275 Improvement of Basgara FRB (Bora Dham)-Tamlay Dhigi via kastor Road at Ch.00-500m. RDRIIP pirganj 0.50 31.41 M/s Provat Samir Shahajan Alam, Pirganj, Thakurgaon 27.56 27/04/2016 03/05/2017 100  
135 RDRIIP/THA/VR-421 Improvement of Begungaon-Mashiandopur Road at ch. 8300-9000m RDRIIP pirganj 0.70 38.47 M/s Khan Enterprtise, Satabgonj, Dinajpur 36.83 19/06/2017 25/06/2018 100  
136 RDRIIP/THA/ VR-422 Improvement of Pirgaon-Birganj RHD (Porapukur)-Begunbari hat Road at ch.1000-200m RDRIIP pirganj 1.00 55.21 Md. Haider Ali, Thakurgaon 53.71 31/05/2016 06/06/2018 100  
137 RDRIIP/THA/ VR-423 Improvement of Begunbarj –Mashlandopur Road at ch. 10000-11000m RDRIIP pirganj 1.00 56.98 Md. Haider Ali, Thakurgaon 55.57 31/05/2017 06/06/2018 100  
138 RDRIIP/THA/VR-425 Improvement of Kismot Saidpur Tematha (GPS)-Kazipara Village Road at ch. 00-500m RDRIIP pirganj 0.50 28.78 M/s Khan Enterprtise, Satabgonj, Dinajpur 27.63 19/06/2017 25/06/2018 100  
139 RDRIIP/THA/ VR-426 Improvement of Bishaspur-Rangolikura Road at Ch. 1500-2500m RDRIIP pirganj 1.00 56.98 Md. Abu Halal, Goshpara, Thakurgaon. 59.28 23/05/2017 02/06/2018 100  
140 RDRIIP/THA/VR-427 Improvement of Birholi-Nakkati Road (Sobhan College)-Upazilla Chairman para Road at ch. 00-700m RDRIIP pirganj 0.70 40.14 M/s Khan Enterprtise, Satabgonj, Dinajpur 37.95 23/05/2017 25/06/2018 100  
141 RDRIIP/THA/VR-522 Improvement of Kachaon Domuria-Gorura Road at ch. 2500-3000m RDRIIP pirganj 0.50 28.21 M/s Khan Enterprtise, Satabgonj, Dinajpur 26.58 19/06/2017 25/06/2018 100  
142 RDRIIP/THA/VR-544 Improvement of Bhabnaganj hat –Kinu choudhury Road ch. 1550-3050m RDRIIP pirganj 1.50 80.20 Md. Abu Halal, Goshpara, Thakurgaon. 80.01 05/06/2017 05/06/2018 100  
143 RDRIIP/THA/VR-563 Improvement of Chapor Arunima Auto Rice Mill-Chapor GPS Road Ch 00-500m ID 194825311 Pirganj Upazila District. Thakurgaon (Salvage Cost 57,075.00) RDRIIP pirganj 0.50 30.80 M/S Ambition Trading Hazipara, Thakurgaon 29.26 20/09/2018 26/09/2018 10  
144 RDRIIP/ THA/ M-008 Maintenance of Bishnopur FWC - jabarhat GC Road Ch. 00-4500m RDRIIP pirganj 4.50 61.55 Narayani Debi, Gudribazar, Thakurgaon 49.19 20/01/2016 26/01/2017 100  
145 RDRIIP/THA/ TR-011 Tree Plantation work on Nakkatihat GC – Sinua RHD road.(Ch.2500-3800m).(effective length=1000m) RDRIIP pirganj 1.00 1.50 LCS women 1.50 15/09/2014 14/09/2016 100  
146 RDRIIP/THA/ UZ-011 Improvement of Nekmord College R&H – Moharaja GC Road (Ch. 00-1000m). RDRIIP ranisankail 1.00 65.46 Md. Abu Siddique Tota, Kalibari, Thakurgaon. 51.64 08/09/2014 14/09/2015 100  
147 RDRIIP/THA/UZ-103 Improvement of Mirdangi hat R&H-Jadurani GC Road at Ch. 5950-7180m RDRIIP ranisankail 1.23 83.98 Md. Jamal Hossain, N. C Road Thakurgaon 75.58 16/05/2017 22/05/2018 100  
148 RDRIIP/THA/ UN-043 Improvement of Ranisankail Bandar Bazarhat - Choral Bazar Road (Ch. 2163-3163m). RDRIIP ranisankail 1.00 57.31 M.H Corporation, Boda, Panchagorh. 47.23 08/09/2014 14/09/2015 100  
149 RDRIIP/THA/ UN-044 Improvement of Dharmogarh UP office - Laxmirhat Road (Ch. 2370-3370m). RDRIIP ranisankail 1.00 53.54 M/S Swapon Enterprise, Ranisankail, Thakurgaon. 42.27 08/09/2014 14/09/2015 100  
150 RDRIIP/THA/UN-178 Improvement of Dharmagaor UP Office-Shaptirhat Road at ch.(CH: 1220-2220m) RDRIIP ranisankail 1.00 55.90 M/S Swapon Enterprise, Ranisankail, Thakurgaon. 44.81 27/01/2016 02/02/2017 100  
151 RDRIIP/THA/UN-179 Improvement of Nekmord hat GC (WDB Office) – Vorniahat road (CH: 00-1002m) RDRIIP ranisankail 1.02 55.72 M/S Swapon Enterprise, Ranisankail, Thakurgaon. 43.60 27/01/2016 02/02/2017 100  
152 RDRIIP/THA/UN-180 Improvement of Ranishankail Chadni R&H – Bhabanandopur Nekmord UP Via Sandoarai MP Para (CH: 1250-2250m) RDRIIP ranisankail 1.00 54.37 Md, Abdul Aziz, Ranisankail, Thakurgaon 43.51 27/01/2016 02/02/2017 100  
153 RDRIIP/THA/UN-244 Improvement of Sandharay R&H- Bongoan (Nanduar UP) Road at Ch. 00-1000m. RDRIIP ranisankail 1.00 59.30 Md, Abdul Aziz, Ranisankail, Thakurgaon 50.39 10/05/2016 16/05/2017 100  
154 RDRIIP/THA/UN-245 Improvement of Ranisankail-Jawgaonhat Via Kumuria Jatrabari Road at Ch.200-1200m). RDRIIP ranisankail 1.00 57.52 M/S Swapon Enterprise, Ranisankail, Thakurgaon. 48.89 15/05/2016 22/05/2017 100  
155 RDRIIP/THA/ VR-007 Improvement of Ranishankail Baliadangi Pacca Road Kornite More - Gazirhat GC Road (Ch. 00-500m). RDRIIP ranisankail 0.50 25.97 M H Corporation 21.49 23/04/2014 28/01/2015 100  
156 RDRIIP/THA/ VR-008 Improvement of Hatpukur Pacca Road – Maradhar (President Khamar) via Rajhadihi Road (Ch. 00-500m). RDRIIP ranisankail 0.50 25.97 A.H.M Sadequl Islam 23.37 23/04/2014 28/01/2015 100  
157 RDRIIP/THA/VR-228 Improvement of Moharajahat-Lohagara Canal Road (CH: 1000-1500m) RDRIIP ranisankail 0.50 37.35 M/S, R,R Enterprize, Bhully Bazar, Thakurgaon 21.90 20/01/2016 26/01/2017 100  
158 RDRIIP/THA/VR-227 Improvement of Molnahat BD Junior high School RHD-Bokradangi Math Tematha via Chairman House Road (CH: 620-1120m) RDRIIP ranisankail 0.50 21.64 M/S, R,R Enterprize, Bhully Bazar, Thakurgaon 17.06 20/01/2016 26/01/2017 100  
159 RDRIIP/THA/VR-282 Improvement of RHD Horipur Near Shamsul shop-keutown FRB Road via Hossengaon UP Road at Ch. 00-500m) RDRIIP ranisankail 5.00 30.31 M/S Bhai Bhai Traders, Ranisankail, Thakurgaon 30.28 22/06/2016 28/06/2017 100  
160 RDRIIP/THA/VR-283 Improvement of Ratore UP shafikuls Mill-Attkara Communtity clinic via vetai Rashid Road at Ch. 00-500m) RDRIIP ranisankail 0.50 30.37 M/S Sowapon Enterprise, Ranisankail, Thakurgaon 30.33 21/06/2016 27/06/2017 100  
161 RDRIIP/THA/VR-357 Improvement of Kornite R&H-Gagirhat via Alsiahat Road at ch 1000-2000m Under Ranisanakil Upazila, Dist Thakurgaon Road ID 194864006 RDRIIP ranisankail 1.00 56.49 M.H. Corporation, Boda,Panchagarh. 46.46 24/09/2016 30/09/2017 100  
162 RDRIIP/THA/VR-414 Improvement of Tojam Brick Field-Bhotharam house via Nadabari Dr. para Road at Ch. 00-500m RDRIIP ranisankail 0.50 36.78 M/s Bhai Bhai Traders, Ranisankail, Thakurgaon 33.10 21/05/2017 27/05/2018 100  
163 RDRIIP/THA/VR-415 Improvement of Nuntor-Vhornia Hat Road at Ch. 00-500m RDRIIP ranisankail 0.50 29.36 M/s Bhai Bhai Traders, Ranisankail, Thakurgaon 26.43 21/05/2017 28/05/2018 100  
164 RDRIIP/THA/VR-405 Improvement of Gangua Solaiman house Pacca Road –Gangua Borrow Mosque Via Brigediar General Road at Ch. 00-503m RDRIIP ranisankail 0.50 30.32 Md. Hamidur Rahman, Haripur, Thakurgaon 27.28 22/05/2017 28/05/2018 100  
165 RDRIIP/THA/VR-406 Improvement of KD Girls School Mor-Bakradangi Eidga mat via Primiuam sead Ltd.Road at Ch. 300-800m RDRIIP ranisankail 0.50 28.62 M/S Sowapon Enterprise, Ranisankail, Thakurgaon 25.75 12/06/2017 14/06/2018 100  
166 RDRIIP/THA/VR-514 Improvement of Enamul Chairman Hasking Mill-Purboapara Pucca Road at ch. 00-500m RDRIIP ranisankail 0.50 36.78 Md.Hamidur Rahman,Haripur Thakurgaon 25.84 06/06/2017 12/06/2018 100  
167 RDRIIP/THA/VR-515 Improvement of Gandogram Ibrahim Member House-Jadur UZR Road at ch. 00-500m RDRIIP ranisankail 0.50 29.31 Md.Hamidur Rahman,Haripur Thakurgaon 26.38 06/06/2017 12/06/2018 100  
168 RDRIIP/THA/ BR-012 Construction of 60.00m Long RCC Girder Bridge on vhornia hat –Bongaon via Bindhalbari Ghat Road at Ch. 1350m Nuna River RDRIIP ranisankail 60.00 267.22 Md. Jamal Hossain, N.C Road, Thakurgaon 217.05 16/06/2016 22/06/2017 100  
169 RDRIIP/THA/ UN-021 Improvement of Balia UP (Khuraghor NHW) – Sabdal Hat Road (Ch. 00-500m). RDRIIP thakurgaon-s 0.50 25.61 Md. Humayun Kabir Kalibari, Thakurgaon. 25.53 29/06/2014 05/05/2015 100  
170 RDRIIP/THA/ UN-047 Improvement of Balia U.P. (Kureghar) NHW - Sabdalhat Road (Ch. 500-1500m). RDRIIP thakurgaon-s 1.00 53.00 M.A. Mukta Sarkar, Thakurgaon Road, Thakurgaon. 43.95 12/10/2014 18/10/2015 100  
171 RDRIIP/THA/ UN-027 Improvement of Dholorhat - Rajagaon U.P Road (Ch. 00-1000m). RDRIIP thakurgaon-s 1.00 52.90 M/S M.B Motors, Sarkarpara, Thakurgaon. 43.91 17/11/2014 28/11/2015 100  
172 RDRIIP/THA/ UN-078 Improvement of Balia U.P. Office - (Bhully-Farabari) - Dholorhat Road (Ch. 3369-4373m). RDRIIP thakurgaon-s 1.00 63.55 Md. Abu Helal, Goshpara, Thakurgaon. 55.32 20/11/2014 26/11/2015 100  
173 RDRIIP/THA/ UN-079 Improvement of Balia U.P. Office - (Bhully-Farabari) - Dholorhat Road (Ch. 4373-5400m). RDRIIP thakurgaon-s 1.00 52.90 M/S M.B Motors, Sarkarpara, Thakurgaon. 43.91 17/11/2014 23/11/2015 100  
174 RDRIIP/THA/ UN-085 Improvement of Auliapur agaon U.P-Borogaon U.P Office Road (Ch. 00-1000m). RDRIIP thakurgaon-s 1.00 47.70 Md. Abdul Quddus, Kalibari, Thakurgaon. 44.01 18/03/2015 24/03/2016 100  
175 RDRIIP/THA/ UN-086 Improvement of Auliapur agaon U.P-Borogaon U.P Office Road (Ch. 1000-2000m). RDRIIP thakurgaon-s 1.00 50.76 Md. Abdul Quddus, Kalibari, Thakurgaon. 46.96 18/03/2015 24/03/2016 100  
176 RDRIIP/THA/ UN-137 Improvement of Balia U.P. (Kureghar) NHW - Sabdalhat Road (Ch. 1500-3000m). RDRIIP thakurgaon-s 1.50 76.64 A.H.M Shadaqul Islam, Ashrampara, Thakurgaon 72.13 08/06/2015 10/07/2016 100  
177 RDRIIP/THA/ UN-138 Improvement of Balia UP Office (Bhully – Farabari) – Dholor Hat Road (Ch. 00-1500m, Effective Length = 1483m). RDRIIP thakurgaon-s 1.48 81.49 A.H.M Shadaqul Islam, Ashrampara, Thakurgaon 74.88 08/06/2015 10/07/2016 100  
178 RDRIIP/THA/ UN-139 Improvement of Balia UP Office (Bhully – Farabari) – Dholor Hat Road (Ch. 1500-3000m, Effective Length = 1496m). RDRIIP thakurgaon-s 1.50 90.49 Md.Khairul Islam (Roman),Chanmaripara,Thakurgaon. 85.99 04/06/2015 10/05/2016 100  
179 RDRIIP/THA/ UN-140 Improvement of Dholorhat – Rajagaon UP Road (Ch. 1000-2650m). RDRIIP thakurgaon-s 1.65 87.22 A.H.M Shadaqul Islam, Ashrampara, Thakurgaon 81.00 01/06/2015 10/07/2016 100  
180 RDRIIP/THA/ UN-166 Improvement of Dholorhat – Rajagaon UP Road (Ch. 2650-4000m). RDRIIP thakurgaon-s 1.35 75.85 M/s Richi Enterprise, Hazipara, Thakurgaon 63.84 06/10/2015 11/10/2016 100  
181 RDRIIP/THA/UN-181 Improvement of Mohammadpur UP office–P–Mohammadpur hat Road (Ch.00-1000m) RDRIIP thakurgaon-s 1.00 59.59 Md, Abdul quddus, kaiibari, Thakurgaon 49.66 21/01/2016 26/01/2017 100  
182 RDRIIP/THA/UN-277 Improvement of Dholarhat-Razagaon UP Road (Ch.4000-4300m) RDRIIP thakurgaon-s 0.30 15.96 Md, Aynul Haque, kaiibari, Thakurgaon 14.34 04/10/2016 10/10/2017 100  
183 RDRIIP/THA/UN-297 Improvement of Jagannathpur UP Office (Khochabari GC)-Danar hat Road at Ch. 1870-2870m RDRIIP thakurgaon-s 1.00 72.87 M/s M.B Motor's Goalpara, Thakurgaon 69.20 29/05/2017 01/06/2018 100  
184 RDRIIP/THA/UN-331 Improvement of Dhalorhat-Akhanagar UP (Dhalorhat-Madhabpur) Road at ch.00-500m RDRIIP thakurgaon-s 0.50 30.75 Md. Humayun Kabir, Kalibari, Thakurgaon. 30.44 08/06/2017 14/06/2018 100  
185 RDRIIP/THA/UN-332 Improvement of Chilarang UP Office Chowrangi Pucca Road (Dogachi hat-Chilarang UP office Road at ch. 3300-3800m I RDRIIP thakurgaon-s 0.50 37.04 M/s Mizan Trader's, Chanmaripara, Thakurgaon. 36.48 11/06/2017 17/06/2018 100  
186 RDRIIP/THA/ VR-001 Improvement of Senpara Horimondir - Ruhiya Food Godown Road (Ch. 00-500m). RDRIIP thakurgaon-s 0.50 22.27 A.H.M Sadequl Islam, Ashrampara, Thakurgaon 20.33 23/04/2014 28/01/2015 100  
187 RDRIIP/THA/ VR-047 Improvement of Laluthuti - Puratan Gorea road (Goreya Bhaully Pucca - Iskon mondir road) (Ch. 4400-4900m). RDRIIP thakurgaon-s 0.50 25.13 Md. Humayun Kabir Kalibari, Thakurgaon. 25.04 29/06/2015 05/05/2015 100  
188 RDRIIP/THA/ VR-091 Improvement of Bangladesh Open University – Bahadurpara Road (Ch. 900-1400m). RDRIIP thakurgaon-s 0.50 26.27 M/S M.B Motors, Sarkarpara, Thakurgaon. 21.82 17/11/2014 23/09/2015 100  
189 RDRIIP/THA/ VR-105 Improvement Ruhia RHD (Ginni Debi Mohila Collage) – Senihari Dighi (Senihari Pukur – Ruhia Pucca) Road (Ch. 950-1550m). RDRIIP thakurgaon-s 0.60 37.80 M/S Bozlur Rahman, Thakurgaon Road, Thakurgaon. 31.54 27/11/2014 03/10/2015 100  
190 RDRIIP/THA/ VR-106 Improvement of Akhanagar Rail Station - Dogachi Bazar Road (Ch. 2000-2707m). RDRIIP thakurgaon-s 0.70 36.90 Md. Humayun Kabir, Kalibari, Thakurgaon. 30.81 23/11/2014 30/09/2015 100  
191 RDRIIP/THA/ VR-177 Improvement of Lauthuty – Puratan Goreya (Iskon Mondir) Road (Ch. 500-1800m). RDRIIP thakurgaon-s 1.30 83.10 Md. Abu Halal, Goshpara, Thakurgaon. 74.12 07/06/2015 10/07/2016 100  
192 RDRIIP/THA/ VR-214 Improvement of Ruhia Food Gogown road – Senpara (Shenpara Harimandir – Ruhia Food Godown) Road (Ch. 60-271m & 797-1372m). RDRIIP thakurgaon-s 0.79 36.48 Md. Rajab Ali Hazipara, Thakurgaon 31.01 30/09/2015 21/07/2016 100  
193 RDRIIP/THA/ VR-278 Improvement of Ruhia RHD (Gini Debi Mohila Collage)-Senihari Pukur-Ruhia Pucca) Road at Ch.00-925m. RDRIIP thakurgaon-s 0.93 51.04 M/s Ranco Traders Ashrampara, Thakurgaon 44.66 05/05/2016 11/05/2017 100  
194 RDRIIP/THA/VR-408 Improvement of Abdur Rahmans house-Sonibular house via Chilargong boro Mosque Road at Ch. 00-497m RDRIIP thakurgaon-s 0.50 28.70 Md. Bazlur Rahman, Thakurgaon Road, Thakurgaon 30.13 07/06/2017 09/06/2018 100  
195 RDRIIP/THA/VR-409 Improvement of Bhowlar hat-Tetulia Road at Ch. 87-607m RDRIIP thakurgaon-s 0.52 30.34 M.d Haider Ali, Ashrampara, Thakurgaon 29.87 31/05/2017 06/06/2018 100  
196 RDRIIP/THA/VR-516 Improvement of Fershadangi hat-Arazi matrigaon Road at ch. 700-1200m RDRIIP thakurgaon-s 0.50 27.42 Md. Humayun Kabir Kalibari, Thakurgaon. 27.14 08/06/2017 14/06/2018 100  
197 RDRIIP/ THA/ M-028 Maintenance of Goreya GC-Bhully GC Road at ch 00-5000m RDRIIP thakurgaon-s 5.00 115.13 Ram Babu, Gudribazar, Thakurgaon 81.11 06/11/2016 12/11/2017 100  
198 RDRIIP/THA/M-049 Maintenance of Collegepara-Ruhia RHD Road ch.00-4820 RDRIIP thakurgaon-s 4.82 102.94 Md. Jamal Hossain, N.C Road, Thakurgaon 92.65 06/06/2017 06/06/2018 100  
199 RDRIIP-2/W- UNR-002 Improvement of Bhanor Up office(Haldibari) Shidorkalonda hat via kalir Road ch. 00-1500m under Baliadangi Upazila, Dist:- Thakurgaon ID No.194083020 (Tender ID. 179898) RDRIIP2 baliadangi ID No.194083020 1.50 0.00 0 106.78 Md. Forhadur Raza, Ashrampara, Thakurgaon. 101.44 01/01/1900 27/05/2018 16/10/2018 100 101.32 0 17/09/2023 Final Bill
200 RDRIIP-2/W- UNR-076 Improvement of Amjankhore UP office -School hat-BDR (Mondumala) hat via Surma hat Road Ch. 500-2000m .ID .194083021 RDRIIP2 baliadangi ID .194083021 1.50 0.00 0 125.60 M/s Monowara Hasking Mill, Baliadangi, Thakurgaon. 119.32 01/01/1900 14/08/2018 23/12/2018 100 119.15 0 17/09/2023 Final Bill
201 RDRIIP-2/W- UNR-083 A) Improvement of Paria UP office (Pariahat) - Horinmary GC via Amjankhore GPS Road Ch.00 - 1200m under Baliadangi Upazila, Dist:- Thakurgaon ID No.194083016.B) Improvement of Baliadangi - Duosuo UP office (Kalmegh) via terokona Regd.Non.Govt.Pry.Scho RDRIIP2 baliadangi ID No.194083016. 1.20 0.00 0 194.98 M/s Mizan Traders, Chadmari para , Thakurgaon 185.23 01/01/1900 07/08/2018 27/11/2018 100 184.79 0 17/09/2023 Final Bill
202 RDRIIP-2/W-UNR-104 Improvement of Paria UP Office ( pariahat) - Futanir hat via lohagara hat Road (Ch.10480m-12480m).ID No-194083014. Under Baliadangi Upazila, Dist: Thakurgaon RDRIIP2 baliadangi ID No-194083014. 2.00 0.00 0 188.97 M/s Karib Enterprise, Chanmarypara,Thakurgaon. 179.52 01/01/1900 11/10/2018 15/07/2019 100 178.30 0 17/09/2023 Final bill
203 RDRIIP-2/W-UNR-112 A) Improvement of 'Baliadangi (Rupganj)- Amjankhore UP office (School hat) via Moralhat Road (Ch:8210-9510m). ID No- 194083001.B) Improvement of CharolUP office (Lahiri GC)- Futanirhat via Tegachia Road (Ch:4257-4900m). ID No-194083007.C) Improvement of B RDRIIP2 baliadangi ID No- 194083001. ID No-194083007. ID No- 194083012. 3.19 0.00 0 253.84 M/S Mondol Traders,Chowkbaria,Nowgaon 253.84 01/01/1900 17/04/2019 02/01/2020 100 253.77 0 17/09/2023 Final bill
204 RDRIIP-2/W- UNR-153 A)Improvement of Baliadangi Girls H/school-Noyar hat via Mohajon hat Road at( ch. 2030-3230m)ID No-194083003 Under Baliadangi Upazila, Dist:- Thakurgaon RDRIIP2 baliadangi ID No-194083003 1.20 0.00 0 90.80 M/s Monowara Hasking Mill, Baliadangi, Thakurgaon. 86.26 01/01/1900 13/01/2019 29/04/2019 100 86.26 0 17/09/2023 Final Bill
205 RDRIIP-2/W-VRA-004 Improvement of Lahiri GC-Futanirhat Via Bottali & Grampara Road ch. 4120-5620m under Baliadangi Upazila, Dist:- Thakurgaon ID No.194084037 (Tender ID. 179893) RDRIIP2 baliadangi ID No.194084037 1.50 0.00 0 121.31 Dilruba Akter Sorna, Kalibari, Thakurgaon 115.25 01/01/1900 14/05/2018 13/10/2018 100 115.14 0 17/09/2023 Final Bill
206 RDRIIP-2/W-VRA-005 Improvement of Horipur Govt Pry. School-Beurjhary hat via Kiruamaldaghpara Road ch. 1790-3190m under Baliadangi Upazila, Dist:- Thakurgaon ID No.194084029 (Tender ID 199894) RDRIIP2 baliadangi ID No.194084029 1.40 0.00 0 103.33 S.M.A Moin, Thakurgaon Road,Thakurgaon 98.16 01/01/1900 30/05/2018 24/06/2018 100 98.07 0 17/09/2023 Final Bill
207 RDRIIP-2/W-VRA-006 Improvement of Baliadangi Sugar can-Maddah Baliadangi Regd. P/School Road ch. 00-1410m & 1586-2432m under Baliadangi Upazila, Dist:- Thakurgaon ID No.194084033 (Tender ID. 179895) RDRIIP2 baliadangi ID No.194084033 2.26 0.00 0 159.11 Md. Firoz Biswas, Thakurgaon 151.16 01/01/1900 31/05/2018 28/10/2018 100 150.63 0 17/09/2023 Final Bill
208 RDRIIP-2/W-VRA-035 Improvement of Baliadangi-Gandigari Telipara via Amtoli GPS Road at ch. 500-4000m under Baliadangi Upazila, Dist:- Thakurgaon ID No.194084004 (Tender ID. 186092) RDRIIP2 baliadangi ID No.194084004 3.50 0.00 0 271.67 Ram Babu, Guduribazat, Thakurgaon 271.67 01/01/1900 12/06/2018 24/10/2018 100 271.47 0 17/09/2023 Final Bill
209 RDRIIP-2/W-VRA-036 Improvement of Chakdha Pukur Bamonia via Ray Mahal Road at ch. 175-3675m under Baliadangi Upazila, Dist:- Thakurgaon ID No.194084009 (Tender ID 186095) RDRIIP2 baliadangi ID No.194084009 3.50 0.00 0 251.60 Ram Babu, Guduribazat, Thakurgaon 251.59 01/01/1900 07/06/2018 11/11/2018 100 242.30 0 17/09/2023 Final Bill
210 RDRIIP-2/W-VRA-037 Improvement of Shoula Bandor Machkhuria via Badh michil Regd. P/School Road at ch. 00-1705 & 2605-3900m under Baliadangi Upazila, Dist:- Thakurgaon ID No.194084026 (Tender ID 186095) RDRIIP2 baliadangi ID No.194084026 3.00 0.00 0 232.21 Ram Babu, Guduribazat, Thakurgaon 232.20 01/01/1900 10/06/2018 15/12/2018 100 226.88 0 17/09/2023 Final Bill
211 RDRIIP-2/W-VRA-107 Improvement of Peaz Pukur -Bangrol jia Bari via Madhobpur Govt.Pry.School Road Ch.1800 - 3300m under Baliadangi Upazila, Dist:- Thakurgaon ID No.194084023.(Tender ID 201423) RDRIIP2 baliadangi ID No.194084023 1.50 0.00 0 116.86 Md. Romjan ali, Chandmaripara, Thakurgoan 111.02 01/01/1900 21/08/2018 29/04/2019 100 110.93 0 17/09/2023 Final Bill
212 RDRIIP-2/W-VRA-147 Improvement of Moharajpur Regd. Non.Govt.Pry School-Badambari hat via Rahim Uddin junior school Road (Ch. 904m-2004m).ID No-194084025. Under Baliadangi Upazila, Dist: Thakurgaon RDRIIP2 baliadangi ID No-194084025. 1.10 0.00 0 87.16 AHM Sadekul Islam.Ashrompara Thakurgaon. 82.80 01/01/1900 20/09/2018 18/11/2018 100 82.73 0 17/09/2023 Final Bill
213 RDRIIP-2/W-VRA-203 A) Improvement of Junia Bandor-Belhara Via Kaldanga Madrasha Road ( ch.2804-4504m) under Baliadangi Upazila, Dist:- Thakurgaon ID No.194084011. B) Improvement of Badambari Sarker Para-Kashua Timoy GHat Via Nagar Vita BOP Road ( ch.00-1600m) under Baliada RDRIIP2 baliadangi ID No.194084011 ID No.194084015. 3.30 0.00 0 278.29 Ram Babu, Guduribazat, Thakurgaon 278.00 01/01/1900 16/01/2019 09/11/2020 100 275.06 0 17/09/2023 Final Bill
214 RDRIIP-2/W-VRA-204 A) Improvement of Dhonir hat -Gandhigari via Kalirhat Road ( ch. 00-1500m,1650-2550m) under Baliadangi Upazila, Dist:- Thakurgaon ID No.194084001. RDRIIP2 baliadangi ID No.194084001. 2.80 0.00 0 216.23 M/S Juel Electronics,Mojaffor Biponi Bitan,Main Road,Nawgaon. 216.00 01/01/1900 13/01/2019 30/05/2019 100 215.98 0 17/09/2023 Final bill
215 RDRIIP-2/W-VRA-259 A) Improvement of Chakdah Pukur to Bamonia Via Ray mahal Road Ch. 3630m to4110m Road ID No.194084009. B) Improvement of Sarbomongla to Hauda via Taraute Road Ch. 4318m to 5350m Road ID No.194084010.C) Improvement of Jaunia to Chockdhagh NGPs Road Ch. 200 RDRIIP2 baliadangi ID No.194084009 Road ID No.194084010 ID No.194084059. 2.79 0.00 0 249.74 Md. Jamal Hossain NC Road Thakugaon. 196.79 01/01/1900 30/10/2020 12/11/2020 100 197.37 0 17/09/2023 Final bill
216 RDRIIP-2/W-VRB-004 A) Improvement of Tapradangi-Shadubada Pukur Road ch. 00-1100m under Baliadangi Upazila, Dist:- Thakurgaon ID No.194085130. b) Improvement of Mohismary-Amtola Govt.Pry School Via Samir uddin College Road ch. 1150-2650m under Baliadangi Upazila, Dist:- Th RDRIIP2 baliadangi ID No.194085130. ID No.194085009 2.60 0.00 0 172.95 Md. Aynul Haque, Kalibari Thakurgaon 164.30 01/01/1900 27/05/2018 03/05/2019 100 164.15 0 17/09/2023 Final Bill
217 RDRIIP-2/W-VRB-005 A) Improvement of Dogachi Molani Pukur-Khalipur Botgass Road ch. 00-1050m under Baliadangi Upazila, Dist:- Thakurgaon ID No.194085134. B) Improvement of Udaypur Balubari-Jugihar Neya bosti via Gadughat Road ch. 600-1950m under Baliadangi Upazila, Dist:- RDRIIP2 baliadangi ID No.194085134. ID No.194085006 2.40 0.00 0 164.05 M/S. Khalil Traders, Gobindanagar, Thakurgaon. 155.85 01/01/1900 14/05/2018 01/04/2019 100 155.82 0 17/09/2023 Final Bill
218 RDRIIP-2/W- VRB-076 Improvement of Kalirthan -Raypur Road Ch.00- 2510m under Baliadangi Upazila, Dist:- Thakurgaon ID No.194085034 (Tender ID 201413) RDRIIP2 baliadangi ID No.194085034 2.51 0.00 0 204.97 Md. Abdul awal, Bus Stand Thakurgaon 194.72 01/01/1900 28/08/2018 28/08/2019 100 194.58 0 17/09/2023 Final Bill
219 RDRIIP-2/W- VRB-077 A) Improvement of Choto Polasbari -Sarkarpara Jamirul Master Road Ch.00 - 850m under Baliadangi Upazila, Dist:- Thakurgaon ID No.194085135. B) Improvement of Sorolia GPS - Purbo Sorolia Amirul Islam house Road Ch.00 - 1000m under Baliadangi Upazila, Dis RDRIIP2 baliadangi ID No.194085135. ID No.194085136 1.85 0.00 0 128.24 Naimuddin and sons, Kochupara, Thakurgaon. 121.83 01/01/1900 14/08/2018 03/07/2019 100 121.10 0 17/09/2023 Final Bill
220 RDRIIP-2/W- VRB-078 A) Improvement of Kadashuka kazibosti -bardhaly Regd Pry.School Road Ch.00 - 1000m under Baliadangi Upazila, Dist:- Thakurgaon ID No.194085053.B) Improvement of Balia BOP - Nitoldoba Uttarpa;ra via Grampara & Sobhanpara Road Ch.00 - 500m under Baliada RDRIIP2 baliadangi ID No.194085053. ID No.194085072 1.50 0.00 0 122.97 Md. Khairul islam Ruma, Chand maripara, Thakurgaon 116.82 01/01/1900 02/08/2018 07/08/2019 100 116.71 0 17/09/2023 Final bill
221 RDRIIP-2/W- VRB-079 A) Improvement of Baliapukur - Amtola via Janta saw Mill Road Ch.930 - 1430m under Baliadangi Upazila, Dist:- Thakurgaon ID No.194085058.B) Improvement of ruhimari - Dighipara GPS Road Ch.00 - 1210m under Baliadangi Upazila, Dist:- Thakurgaon ID No.194 RDRIIP2 baliadangi ID No.194085058. ID No.194085086 1.71 0.00 0 118.99 Md. Anamul Houqe,Thakurgaon road, Thakurgaon 113.04 01/01/1900 07/08/2018 02/12/2018 100 109.99 0 17/09/2023 Final bill
222 RDRIIP-2/W-VRB-098 A) Improvement of Patila Bhasa -Chowrangi hat Road (Ch.00-850m) ID No-194085063. B) Improvement of Morolbasti Rice Mill -Dishari GPS via Medhapara Road (Ch.00-1000m) ID No-194085132 C) Improvement of Paria Hat - kaldanga Madrasha Road (Ch.00-1600m) ID RDRIIP2 baliadangi ID No-194085063. ID No-194085132 ID No-194085100 ID No-194085078. 4.45 0.00 0 360.36 AHM Sadekul Islam.& Nazir Hossein JV.Ashrompara Thakurgaon. 388.93 01/01/1900 04/10/2018 15/04/2019 100 388.46 0 17/09/2023 Final Bill
223 RDRIIP-2/W-VRB-097 A) Improvement of Korua Maldah para - Goriali Hindupara via Sathsuria Road (Ch.650-1650m) ID No-194085019. B) Improvement of Duosuo Napitpara - Mahish mari Mistripara via Lolpukur D.M School Road (Ch.2265-3300m) ID No-194085052C) Improvement of Dharia B RDRIIP2 baliadangi ID No-194085019. ID No-194085052 ID No-194085127 ID No-194085137. 3.85 0.00 0 320.51 Ram Babu, Guduribazat, Thakurgaon 349.10 01/01/1900 16/10/2018 09/05/2019 100 348.46 0 17/09/2023 Final Bill
224 RDRIIP-2/W-VRB-151 A) Improvement of Jaunia- Chackdagh Regd P/school Road( ch. 1480-2080m) under Baliadangi Upazila, Dist:- Thakurgaon ID No.194085057. B) Improvement of Nagar Vita-Moimonsing Para via Musuldangi Road ( ch. 500-1900m) under Baliadangi Upazila, Dist:- Thaku RDRIIP2 baliadangi ID No.194085057. ID No.194085129. ID No.194085035 3.30 0.00 0 262.01 AHM Sadekul Islam.Ashrompara Thakurgaon. 261.80 01/01/1900 13/01/2019 25/07/2019 100 261.77 0 17/09/2023 Final Bill
225 RDRIIP-2/W-VRB-152 A) Improvement of Kaldanga Madrasha-Pashchim Machkuria via Kattik para Road ( ch. 00-1400m) under Baliadangi Upazila, Dist:- Thakurgaon ID No.194085016. B) Improvement of Takahara hindupara-Thumnia morolpara via tegechia puni pukur Road ( ch. 00-1200m) u RDRIIP2 baliadangi ID No.194085016. ID No.194085074 ID No.194085011. ID No.194085023 4.30 0.00 0 329.84 Ram Babu, Guduribazat, Thakurgaon 329.41 01/01/1900 20/01/2019 04/05/2019 100 329.39 0 17/09/2023 Final Bill
226 RDRIIP-2/W-VRB-153 A) Improvement of Adhardighi Hat-Bobra Eidgha via Eyadi bosti Road ( ch.00-1700m) under Baliadangi Upazila, Dist:- Thakurgaon ID No.194085012. B) Improvement of Ratandighi -Beltola Road ( ch. 00-1300m) under Baliadangi Upazila, Dist:- Thakurgaon ID No.1 RDRIIP2 baliadangi ID No.194085012. ID No.194085088. 3.00 0.00 0 224.97 Ram Babu, Guduribazat, Thakurgaon 224.77 01/01/1900 20/01/2019 26/06/2019 100 224.76 0 17/09/2023 Final Bill
227 RDRIIP-2/W-VRB-211 A) Improvement of Nagarvita to Kanchir hat Via Chochpara Road Ch. 00 to 2585m ID No.194085069. B) Improvement of Tapra dangi to Sadubandhapukur Road Ch. 1100 to 1395m ID No.194085130 under Baliadangi upazila dist. Thakurgaon ]BALIADANGI] RDRIIP2 baliadangi ID No.194085069. ID No.194085130 2.89 0.00 0 251.75 Ram Babu, Guduribazat, Thakurgaon 191.20 01/01/1900 01/12/2019 30/11/2020 100 182.19 0 17/09/2023 Final Bill
228 RDRIIP-2/W-VRB-258 A) Improvement of Dogachi Girls School - Kamar Pukur via Mondolpara Road at ch. 00m to 1200m [Road ID No. 194085138] B) Improvement of Horipur (Kanchamoni) - Udaypur RNGPS Road at ch. 00m to 1600m [Road ID No. 194085070] under Baliadangi Upazila Dist.Thak RDRIIP2 baliadangi ID No. 194085138 ID No. 194085070 2.80 0.00 0 229.12 Kharul Kabir Rana Guptapara, Rangpur 206.21 01/01/1900 70 131.38 0 17/09/2023  
229 RDRIIP-2/W-SCH-09 A) Improvement of Kasua Khadengonj Govt.Primary School Connecting Road at ch. 5030-6130m School Code-102030406 Under Baliadangi Upazila, Dist:- ThakurgaonB) Improvement of Choto Singia Govt.Primary School Connecting Road at ch. 1000-23200m School Code-991 RDRIIP2 baliadangi School Code-102030406 School Code-99102030201 2.42 0.00 0 209.70 Mh-RI JV Bazar Para Thakurgaon 168.08 01/01/1900 22/01/2019 20/01/2020 100 168.07 0 17/09/2023 Final bill
230 RDRIIP-2/W-SCH-11 A) Improvement of Belbari Govt. Primary School Connecting Road at ch. 00-1200m School Code-70203900402 Under Baliadangi Upazila, Dist:- ThakurgaonB) Improvement of Horinmary Govt. Primary School Connecting Road at ch. 1200-2400m School Code-102030702 Und RDRIIP2 baliadangi School Code-70203900402 School Code-102030702 School Code-102030238 School Code-102030106 4.80 0.00 0 375.65 m/s monalisa 37/1/d/1 union road west rampura dhaka 28953535.77 01/01/1900 20/01/2019 26/01/2020 100 28944880.00 0 17/09/2023  
231 RDRIIP-2/W-SCH-12 A) Improvement of Kadam Tola Govt. Primary School Connecting Road at ch. 1000-2250m School Code-70203920302 Under Baliadangi Upazila, Dist:- ThakurgaonB)Improvement of Shoradangi Govt. Primary School Connecting Road at ch. 6880-82320m School Code-9910203 RDRIIP2 baliadangi School Code-70203920302 School Code-99102030314 School Code-102030707 3.90 0.00 0 314.44 Ram Babu, Guduribazat, Thakurgaon 314.06 01/01/1900 07/01/2019 23/05/2019 100 313.84 0 17/09/2023 Final Bill
232 RDRIIP-2/W-SCH-13 A)Improvement of Mahatpara Govt. Primary School Connecting Road at ch. 00-1220m School Code-1102030205 Under Baliadangi Upazila, Dist:- ThakurgaonB)Improvement of Chagajdangi Govt. Primary School Connecting Road at ch. 500-2000m School Code-10203051802 Un RDRIIP2 baliadangi School Code-1102030205 School Code-10203051802 School Code-102030209 School Code-10203030902 4.64 0.00 0 358.76 m/s monalisa 37/1/d/1 union road west rampura dhaka 358.08 01/01/1900 14/01/2019 30/11/2020 100 33.82 0 17/09/2023 Finall Bill
233 RDRIIP-2/W-SCH-14 A)Improvement of Mohajan para Govt. Primary School Connecting Road at ch. 00-1200m School Code-10203081402 Under Baliadangi Upazila, Dist:- ThakurgaonB)Improvement of Bhotpara Govt. Primary School Connecting Road at ch. 00-1350m School Code-102030209 Unde RDRIIP2 baliadangi School Code-10203081402 School Code-102030209 School Code-99102030409 3.90 0.00 0 304.22 RAm Babu, Guduribazat, Thakurgaon 303.84 01/01/1900 07/01/2019 25/05/2019 100 306.74 0 17/09/2023 Final Bill
234 RDRIIP-2/W-BRI-004 Construction of 45.00m Long PC Girder Bridge over Amandhaman River on Baliadangi (Rupganj) - Amjankhore UP Office (School hat) via Morathat Road at ch. 7850m ID. No. 194083001 Under Baliadangi Upazila, Dist: Thakurgaon. RDRIIP2 baliadangi ID. No. 194083001 45.00 0 385.33 Md Khairul Kabir Rana SMC Road Guptopara Rangpur 377.62 01/01/1900 15/11/2019 10/12/2021 100 314.13 0 17/09/2023 Final Bill
235 RDRIIP-2/W-BRI-005 Construction of 81.00m Long PC Girder Bridge over Amandhaman River on Nagarvita - Kanchir hat via chochpara Road at ch. 3200m ID. No. 194085069 Under Baliadangi Upazila, Dist: Thakurgaon. RDRIIP2 baliadangi ID. No. 194085069 81.00 0 491.63 Ram Babu Gudribazar Thakurgaon 481.11 01/01/1900 30/10/2018 27/12/2020 100 449.15 0 17/09/2023 Final Bill
236 RDRIIP-2/W-BRI-006 Construction of 70.00m Long PC Girder Bridge over Tirnai River on Charol UP Office (Lahiri GC) -Dogachi hat via Patilabasha Road at ch. 3925m ID. No. 194083011 Under Baliadangi Upazila, Dist: Thakurgaon. RDRIIP2 baliadangi ID. No. 194083011 70.00 0 375.39 Ram Babu Gudribazar Thakurgaon 356.12 01/01/1900 05/11/2018 23/12/2020 100 344.91 0 17/09/2023 Final bill
237 RDRIIP-2/W-BRI-012 Construction of 54.00m Long RCC Girder Bridge over Singia Khal on Lahiri GC -Kalmegh GC via Dhogachi hat Road at Ch.1036m ID. No. 194082009 Under Baliadangi Upazila, Dist: Thakurgaon. RDRIIP2 baliadangi ID. No. 194082009 54.00 0 272.41 Ram Babu Gudribazar Thakurgaon 272.21 01/01/1900 20/01/2019 28/12/2019 100 271.97 0 17/09/2023 Final bill
238 RDRIIP-2/W-BRI-007 Construction of 45.00m Long PC Girder Bridge over Nohona River on on Baliadangi (Dangi) - Horinmary GC via Adhardighi hat Road at ch. 258m. ID No- 194082002. RDRIIP2 baliadangi ID No- 194082002. 45.00 0 346.35 Md Khairul Kabir Rana SMC Road Guptopara Rangpur 327.65 01/01/1900 15/11/2018 24/04/2022 100 299.03 0 17/09/2023 Final bill
239 RDRIIP-2/W-BRI-008 Construction of 70.00m Long PC Girder Bridge at Tirnai River on Baliadangi - Dhirgonj GC via Badambarihat Road at ch. 1040m. ID No-194082006. RDRIIP2 baliadangi ID No-194082006. 70.00 0 422.60 Md Khairul Kabir Rana SMC Road Guptopara Rangpur 400.47 01/01/1900 15/11/2018 21/11/2019 100 393.88 0 17/09/2023 Final bill
240 RDRIIP-2/W-BRI-018 Construction of 51.00m Long RCC Girder Bridge Over Nitoldoba khal on Nitoldoba Uttarpara Road at ch 450m Road ID No. 194085056 under Baliadangi Upazila Dist-Thakurgaon RDRIIP2 baliadangi ID No. 194085056 51.00 0 292.05 Ram Babu, Guduribazat, Thakurgaon 291.97 01/01/1900 07/10/2019 06/10/2021 100 289.55 0 17/09/2023 Final bill
241 RDRIIP-2/W-CUL-01 Part-A(1) Construction of 01 no 3v-4.0X3.0m RCC box culvert at ch.1722 m on Lahiri G.C Road.ID No.194082007Part-A(2) Construction of 01 no 3v-4.0X3.0m RCC box culvert at ch.1600 m on Khalipur pukurpara-Charol Patilavasha Road.ID No.194085131Part-B(1) Con RDRIIP2 baliadangi ID No.194082007 ID No.194085131 ID No.194082006 ID No.194082006 48.00 0 201.55 Ram Babu, Guduribazat, Thakurgaon 154.97 01/01/1900 07/10/2019 05/08/2020 100 154.89 0 17/09/2023 Final bill
242 RDRIIP-2/W-CUL-03 A) Construction of 01 no 2v.-4.5x3.0m RCC box culvert at ch. 550m on BeurJhari BOP-Chorayghati Road ID No. 194085046. B) Construction of 01 no 3v.-4.5x3.0m RCC box culvert at ch. 1500m on Nayadighi Madrasha to Madhupur Katchnapara Road ID No. 194085015. C RDRIIP2 baliadangi Road ID No. 194085046. ID No. 194085015. ID No. 194085025. ID No. 194085072 45.00 0 135.56 M/S Khan Enterprice, Satabganj, Dinajpur. 100.76 01/01/1900 30/10/2019 26/04/2020 100 100.54 0 17/09/2023 Final bill
243 RDRIIP-2/W-HAT-001 a) Improvement of Haldibari Rural hat bazar b) Improvement of Kushaldangi Rural hat bazarc) Improvement of Dhogachi Rural hat bazarc) Improvement of Dhogachi Rural hat bazard) Improvement of Beurjhari (Amjankhore) Rural hat bazar e) Improvement of Khoch RDRIIP2 baliadangi   0.00 0 174.43 M/s Ali Construction Satabganj, Dinajpur 165.72 01/01/1900 31/05/2018 24/02/2019 100 155.44 0 17/09/2023 Final Bill
244 RDRIIP-2/W-UNR-088 A) Improvement of Haripur-Bhaturia UP office Road (Ch.5960-7960m) ID No-194513002. B) Improvement of Jadurani GC-Amgaon UP office via Nilgaon Road (Ch.00-1500m) ID No-194513006 RDRIIP2 haripur ID No-194513002. ID No-194513006 ID No-1945130012 8.40 0.00 0 124.09 Ram Babu, Guduribazat, Thakurgaon 408.29 01/01/1900 03/10/2018 09/10/2019 100 407.49 0 17/09/2023 Final Bill
245 RDRIIP-2/W-UNR-162 A) Improvement of Haripur UP Office-Dhirgaonj GC Road at ch. 4730-5650m ID. No. 194513001 Under Haripur Upazila, Dist:- Thakurgaon. RDRIIP2 haripur ID. No. 194513001 0.92 0.00 0 66.45 M/S Monowar Hossain Goalpara Thakurgaon 63.12 01/01/1900 19/03/2019 06/02/2020 100 54.67 0 17/09/2023 Final Bill
246 RDRIIP-2/W-VRA-114 A) Improvement of Jamun hat-Balua Road (Ch.00-3000m) ID No-194514002. B) Improvement of Holdibari-Kathaldangi Road (Ch.00-1000m) ID No-194514007 Under Haripur Upazila, District Thakurgaon, RDRIIP2 haripur ID No-194514002. ID No-194514007 4.00 0.00 0 276.78 M/S Progoti Enterprise,Md Abdul Aziz JV Chadni Road Thakurgaon 298.90 01/01/1900 16/10/2018 18/08/2019 100 292.41 0 17/09/2023 Finall bill
247 RDRIIP-2/W-VRA-277 Improvement of Holdibari-Kathaldangi Road (Ch.1000-2510m) ID No-194514007 Under Haripur Upazila, District Thakurgaon, Improvement of Bohiti to Tajigaon via Tangaria BOP Road at (Ch.2550-4740m) ID No-194514019 Under Haripur Upazila, District Thakurgaon, RDRIIP2 haripur ID No-194514007 ID No-194514019 3.70 0.00 0 370.02 M/S Khan Enterprise, Satabgonj, Dinajpur. 308.69 01/01/1900 17/06/2020 25/05/2021 100 297.17 0 17/09/2023 Final Bill
248 RDRIIP-2/W-VRB 231 Improvement of vanta to Kamarpukur Road at ch. 00m-1100m ID No- 194515012 Under Haripur Upazilla, Dist. Thakurgaon. RDRIIP2 haripur ID No- 194515012 1.10 0.00 0 89.93 A H m Sadakul Islam,Asrampara. Thakurgaon. 85.43 01/01/1900 29/10/2020 06/04/2021 100 85.35 0 17/09/2023 Final Bill
249 RDRIIP-2/W-UZR-001 Improvement of Milon Bazar R&H-Katiherhat GC via Bolga Road ch. 2600-5130m under Pirganj Upazila, Dist:- Thakurgaon ID No.194822015, (Tender ID. 180191) RDRIIP2 pirganj ID No.194822015 2.53 0.00 0 199.27 Md. Nur-Nobi, Jaganathpur, Thakurgaon 189.30 01/01/1900 14/06/2018 12/06/2019 100 189.07 0 17/09/2023 Final
250 RDRIIP-2/W-UNR-003 a) Improvement of Jaborhat UP-Ranasia Clubhat via Golongaon Road ch. 500-2500m under Pirganj Upazila, Dist:- Thakurgaon ID No.194823009 b) Improvement of Lohagara GC-Khangaon UP Office Road ch. 00-668m under Pirganj Upazila, Dist:- Thakurgaon ID No.19 RDRIIP2 pirganj ID No.194823009 ID No.194823017 2.67 0.00 0 184.80 M.H Corporation, Boda,Panchagor 179.36 01/01/1900 31/05/2018 05/05/2019 100 179.10 0 17/09/2023 Final Bill
251 RDRIIP-2/W-UNR-106 a) Improvement of Saidpur UP-Danarhat Road (ch-3930-4558m) ID No.194823021 b) Improvement of Hajipur UP-Daulapur UP (Kalipukur FRB Road) (2600-3304m) ID No.194823006c) Improvement of Jaborhat UP-Ronashiahat via Malacha Bridhigoan Road (ch 2000-3000m) I RDRIIP2 pirganj ID No.194823021 ID No.194823006 ID No.194823004 ID No.194823023 5.33 0.00 0 397.84 Md Younus &Brothers (Pvt)Ltd.A.S.Tower(8th Floor Road -01 Plot553 Hillvew R/A Panchlish.Chottogram 356.07 01/01/1900 22/11/2018 09/06/2021 100 352.14 0 17/09/2023 Final Bill
252 RDRIIP-2/ W -UNR-125 A) Improvement of Sengaon UP-Dahanagor hat via Farm, kanari Road ch. 3930-5400m ID. No. 194823011 Under Pirganj Upazila, Dist:- Thakurgaon RDRIIP2 pirganj ID. No. 194823011 1.47 0.00 0 122.91 M.H Corporation,JVMd Delwar Hossein Boda,Panchagor 101.70 01/01/1900 23/01/2019 15/06/2020 100 101.70 0 17/09/2023 Final Bill
253   B) Improvement of Boirchuna UP-Rachgachi hat via Dopali Komaria Road ch. 2000-3348m ID. No. 194823007 Under Pirganj Upazila, Dist:- Thakurgaon RDRIIP2 pirganj ID. No. 194823007 1.35 0.00 0 99.76   82.55 01/01/1900 100 82.55 0 17/09/2023  
254 RDRIIP-2/W-UNR-171 A) Improvement of Hajupur UP- Senua hat via Futanitawn, Vakura P/School Road (Link Road 400m) (Ch. 5400-6850m) ID No- 194823016 Under Pirganj Upozila, Thakurgaon. RDRIIP2 pirganj ID No- 194823016 1.85 0.00 0 125.09 A S T-MS JV, Kalibari,Thakurgaon 125.00 01/01/1900 07/05/2019 30/12/2019 100 124.95 0 17/09/2023 Final Bill
255 RDRIIP-2/W-VRA-007 a) Improvement of Begongaon Madrash-Maslandapur road 8180-8300m and 10500 -11205m under Pirganj Upazila, Dist:- Thakurgaon ID No.194824011 b) Improvement of Nakkati-Sania UZR (Khachon Dumuria Boro Mosque)-Birholi-Nakkati UZR (H/O) Yousuf) via South Kach RDRIIP2 pirganj ID No.194824011 ID No.194824051 2.83 0.00 0 179.73 M/s.F.H. Traders, Pirganj, Thakurgaon 170.71 01/01/1900 14/06/2018 19/05/2019 100 170.52 0 17/09/2023 Final Bill
256 RDRIIP-2/W-VRA-072 Improvement of Pirganj-Birganj R&H Porapukur-Begunbari hat Road at ch. 2000-4000m ID No.194824029 under Pirganj Upazila, Dist:- Thakurgaon (Tender ID 194387) RDRIIP2 pirganj ID No.194824029 2.00 0.00 0 15.22 M/s Loral Construction, Goailpara, Thakurgaon 143.65 01/01/1900 03/07/2018 03/06/2019 100 142.15 0 17/09/2023 Final Bill
257 RDRIIP-2/W-VRA-148 A) Improvement of Thakurgaon R&H ( Tetultala)-khangaon hat Road (Ch. 1500m-2403m).ID No-194824019) B) Improvement of Jabarhat Tamatha -Sadamahalhat Road (Ch. 00m-850m).ID No-194824022. Under Pirganj Upazila, Dist: Thakurgaon RDRIIP2 pirganj ID No-194824019) ID No-194824022. 1.75 0.00 0 117.11 M/s Uttra Construction.Thakurgaon Road Thakurgaon. 111.26 01/01/1900 26/09/2018 12/05/2019 100 111.01 0 17/09/2023 Final Bill
258 RDRIIP-2/ W -VRA-171 A) Improvement of Jogaon-Dt. Elarhat Road ch. 700-1268m & 1865-2610m ID. No. 194824002 Under Pirganj Upazila, Dist:- ThakurgaonB) Improvement of Dhakhin Narawnpur Chowresta-Gaorgaon Non-Govt. P/School Road ch. 00-1400m ID. No. 194824012 Under Pirganj Upa RDRIIP2 pirganj ID. No. 194824002 ID. No. 194824012 ID. No. 194824015 ID. No. 194824021 4.82 0.00 0 373.17 M.H Corporation,JVMd Delwar Hossein Boda,Panchagor 306.74 01/01/1900 23/01/2019 10/09/2020 100 303.14 0 17/09/2023 Final Bill
259 RDRIIP-2/ W -VRA-202 A) Improvement of Kachaondomuria-Goura Road( ch.700-1755m) ID. No. 194824008 Under Pirganj Upazila, Dist:- ThakurgaonB) Improvement of Bhomradha UP Office-Khatherhat FRB Road( ch.00-1120m) ID. No. 194824027 Under Pirganj Upazila, Dist:- Thakurgaon RDRIIP2 pirganj ID. No. 194824008 ID. No. 194824027 2.18 0.00 0 162.76 Md Jamal Hossein North Circuler Road, Thakurgaon 154.62 01/01/1900 16/01/2019 06/08/2019 100 151.32 0 17/09/2023 Final Bill
260 RDRIIP-2/W-VRB-003 a) Improvement of Jaborhat-Narabari Road (Dakkhin Noapara Mosque)-Rajvita Ghat Road ch. 00-250m under Pirganj Upazila, Dist:- Thakurgaon ID No.194825148 b) Improvement of Khongaon Shahpara (H/O Kafi Member)-Araji Matrigaon Road ch. 00-1000m under Pir RDRIIP2 pirganj ID No.194825148 ID No.194825145 ID No.194825009 2.85 0.00 0 194.32 M.H Corporation, Boda,Panchagarh 184.61 01/01/1900 27/05/2018 10/11/2020 100 184.42 0 17/09/2023 Final bill
261 RDRIIP-2/W-VRB-048 a) Improvement of Bishaspur-Rangolikura Road at ch. 1000-1940m ID No.194825022 b) Improvement of Birholi Nakkati Road at Shobahan Collage -Upazila Chairmanpara Road at ch. 00-750m under Pirgonj Upazila, Dist:- Thakurgaon Package No-ID No.194825119 (Te RDRIIP2 pirganj ID No.194825022 ID No.194825119 1.69 0.00 0 164.70 Mrs. Salina Akter, Chainmaripara, Thakurgaon 156.47 01/01/1900 01/07/2018 05/04/2019 100 156.32 0 17/09/2023 Final bill
262 RDRIIP-2/W-VRB-047 a) Improvement of Darasul House-Ruhia pukur Road at ch. 500-1100m ID No.194825013 b) ) Improvement of Kachon shah Alom Hasking Mill to Alampur Tazim Member Tematha Pucca Road at ch. 00-815m ID No. 194825136b) ) Improvement of Kachon shah Alom Hasking Mill RDRIIP2 pirganj ID No.194825013 ID No. 194825136 ID No. 194825142 ID No. 194825143 1.87 0.00 0 128.14 Md. Arfan Ali Gobindonagar, Thakurgaon 157.37 01/01/1900 03/07/2018 15/03/2019 100 126.93 0 17/09/2023 Final Bill
263 RDRIIP-2/W-VRB-108 a) Improvement of Pirganj Thakurgaon –R&H Bottolly lohagara Collage Road (ch 00-1515m) ID No.194825063 b) Improvement of Nowdanga Mosque (Noapara-Jaganatpur 84 Bigha Road (00-1650m) under Pirganj Upazila, Dist:- Thakurgaon ID No.194825073 RDRIIP2 pirganj ID No.194825063 ID No.194825073 3.17 0.00 0 211.73 AHM Sadekul Islam SM Moin JV College Road Thakurgaon. 202.98 01/01/1900 06/11/2018 29/08/2020 100 202.25 0 17/09/2023 Final Bill
264 RDRIIP-2/ W -VRB-149 A)Improvement of Singraul Dohoga- Hazipur FWC. Road at (ch. 1850m-3000m) ID No.194825080 B)Improvement of Pirganj-Nasibgonj pucca Road at shapon Godaon/Shop Basgara Goalpara Robin house Road at( ch. 00-1988m) ID No.194825139 under Pirganj Upazila, Dist:- RDRIIP2 pirganj ID No.194825080 ID No.194825139 ID No.194825051 4.18 0.00 0 315.08 Md Khairul Kabir Rana SMC Road Guptopara Rangpur 314.90 01/01/1900 23/01/2019 01/01/2020 100 313.40 0 17/09/2023 Final Bill
265 RDRIIP-2/ W -VRB-150 A) Improvement of Shirail Obaidur Shop More-Shirail Guccho Gram dangapara -Marfoth house Road( ch.00-1300m) ID. No. 194825078 Under Pirganj Upazila, Dist:- ThakurgaonB) Improvement of Phokirgonj BOP -Autapohar hat Road( ch.00-1200m) ID. No. 194825092 Unde RDRIIP2 pirganj ID. No. 194825078 ID. No. 194825092 2.50 0.00 0 221.68 M Ehteshamul Haque,Zail Road ,Dinajpur 221.55 01/01/1900 23/01/2019 25/11/2020 100 221.33 0 17/09/2023 Final bill
266 RDRIIP-2/W-VRB-207 A) Improvement of Sinua R&h to Talipukur road Ch 1000m to 1590m Road ID No 194825091. B) Improvement of Nowdanga mosque Noapara to Jaganathpur 84 Bigha Road Ch 1650m to 2550m Road ID No 194825073. [PIRGANJ] RDRIIP2 pirganj ID No 194825091. ID No 194825073 1.49 0.00 0 104.69 S.M.A.Moin.Thakurgaon Road, Thakurgaon. 85.71 01/01/1900 30/11/2019 30/10/2020 100 85.69 0 17/09/2023 Final bill
267 RDRIIP-2/W-SCH-24 A) Improvement of Singarol (2) Govt Primary School Connecting Road. School Code-10202060301(Ch. 2000-3000m) Under Pirganj Upozila, Thakurgaon.B) Improvement of Mohanpur (Chairman para) Govt Primary School Connecting Road. School Code-10202130502(Ch. 1000- RDRIIP2 pirganj School Code-10202060301 School Code-10202130502 School Code-10202100501 2.85 0.00 0 233.71 Ms. Juel Eleactronics, Naogaon 233.61 01/01/1900 23/05/2019 21/04/2020 100 232.79 0 17/09/2023 Final Bill
268 RDRIIP-2/W-SCH-25 A) Improvement of Bhelatoir (Uttar para) Govt Primary School Connecting Road. School Code-99102020815(Ch. 7100-8150m) Under Pirganj Upozila, Thakurgaon.B) Improvement of Khangon Biswaspur Govt Primary School Connecting Road. School Code-10202011701(Ch.335 RDRIIP2 pirganj School Code-99102020815 School Code-10202011701 School Code-10202050601 3.27 0.00 0 239.96 Jamal Hossain, NC Road, Thakurgaon 239.92 01/01/1900 16/05/2019 01/05/2020 100 238.17 0 17/09/2023 Final Bill
269 RDRIIP-2/W-SCH-21 A) Improvement of Nandanpur Govt Primary School Connecting Road. School Code-10202061001(Ch.00-1000m) Under Pirganj Upozila, Thakurgaon.B) Improvement of Narayanpur Govt Primary School Connecting Road. School Code-10202110401(Ch. 8430-9430m) Under Pirganj RDRIIP2 pirganj School Code-10202061001 School Code-10202110401 School Code-9110202010 School Code-10202070201 3.85 0.00 0 280.11 M Ehteshamul Haque,Zail Road ,Dinajpur 294.98 01/01/1900 20/05/2019 27/04/2022 100 294.96 0 17/09/2023 Final Bill
270 RDRIIP-2/W-SCH-34 A) Improvement of Dostom pur Govt. Primary School Connecting Road Ch. 1130 to 2500m School Code-10202080301 Salvage amount Tk. 44042.00 [PIRGANJ]B) Improvement of Vakura Govt. Primary School Connecting Road Ch. 9430 to 10810m School Code-91102021102. [P RDRIIP2 pirganj School Code-10202080301 School Code-91102021102. School Code-10202010901. 3.75 0.00 0 288.62 AHM Sadekul Islam SM Moin JV College Road Thakurgaon. 229.91 01/01/1900 07/11/2019 06/11/2020 100 158.98 0 17/09/2023  
271 RDRIIP-2/W-BRI-022 Construction of 32.00 m Long PC Girder Bridge On Hazipur UP to Senua hat Via Futanirtown Vakura P/School Road (Begungaon to Velatoir Bridge) at ch, 12100m Road ID No 194823016 Upazila,Pirganj Dist: Thakurgaon. RDRIIP2 pirganj ID No 194823016 32.00 0 342.47 Ram Babu Gudribazar, Thakurgaon. 305.13 01/01/1900 01/02/2020 31/08/2020 100 303.53 0 17/09/2023 Final
272 RDRIIP-2/W-BRI-021 Construction of 32.00 m Long PC Girder Bridge over Tangonj River on Begungaon Madrasha to Maslandapur Road Begungaon Munsipara Bridge at ch.650m. Road ID No 194824011 Upazila, PirganjDist: Thakurgaon. RDRIIP2 pirganj ID No 194824011 32.00 0 286.14 Ram Babu Gudribazar, Thakurgaon. 256.77 01/01/1900 01/02/2020 31/08/2021 100 255.43 0 17/09/2023 Final
273 RDRIIP-2/W-BRI-045 Construction of 160.00m Long PSC Girder Bridge on Chaurkur ghat-Danarhat GC via Shalgara Road at Ch. 1200m under Pirganj Upazila, District: Thakurgaon [Road ID -194824024] RDRIIP2 pirganj ID -194824024 0.00 0 1750.96 M/s Dawn Corporation-Md. Jamal Hossain JV 1884.77 01/01/1900 03/05/2022 24/10/2023 0 0.00 0 17/09/2023  
274 RDRIIP-2/W-UZR-049 Improvement of Katiharhat GC to Ganirhat R&H via Nutun bosti Road. Ch 00m to 2100m Road ID No 194862016 [RANISANKAIL] RDRIIP2 ranisankail ID No 194862016 2.10 0.00 0 192.83 S A & R A T (JV) Nilphamari. 152.11 01/01/1900 01/12/2019 30/11/2020 100 152.04 0 17/09/2023 Final bill
275 RDRIIP-2/W-UNR-037 Improvement of Futanir Town hat Bhawlar hat GC via Rator hat & Rator UP Road at ch. 1900m-3400m ID No.194863017 under Ranisankail Upazila, Dist:- Thakurgaon (Tender ID 186097) RDRIIP2 ranisankail ID No.194863017 1.50 0.00 0 102.46 M/s Monoara Hasking Mil, Thakurgaon 97.34 01/01/1900 10/06/2018 20/12/2018 100 97.10 0 17/09/2023 Final Bill
276 RDRIIP-2/W-UNR-101 A) Improvement of Ranisankail HQ at joykali hat - Futanir Town hat Road at ch. 3500-4504m ID. No. 194863002 B) Improvement of Ranisankail HQ at Degree College - Banglagarh hat via Bachor UP Road at ch. 3230-4252m ID. No. 194863003 Under Ranisankail Upa RDRIIP2 ranisankail ID. No. 194863002 ID. No. 194863003 2.03 0.00 0 148.94 Atik Enterprise,Goalpara,Thakurgaon. 141.50 01/01/1900 26/09/2018 12/06/2019 100 141.24 0 17/09/2023 Final Bill
277 RDRIIP-2/W-UNR 176 Improvement of Ranisankail Chandi R&H to Bhabanandopur Nekmord UP via Sandharai MP Para Road at ch 1250m to 4163m ID No. 194863009. under Ranisankail Upazila Dist-Thakurgaon. [ RANISANKAIL] RDRIIP2 ranisankail ID No. 194863009. 2.91 0.00 0 113.96 M/S Khan Enterprice Satabjanj , Dinajpur. 90.52 01/01/1900 03/06/2020 100 90.50 0 17/09/2023 Final Bill
278 RDRIIP-2/W-VRA-141 A) Improvement of Bhedail - jaduar Moheshpur Road via kader Ch. House Road at ch. 1900-3400m ID. No. 194864010. B) Improvement of Khutiotuli Bazar R&H - Madhabpur UZR via Bich pakhri chowrasta & Bachor UP Road at ch. 00-1000m ID. No. 194864015 Under Ran RDRIIP2 ranisankail ID. No. 194864010. ID. No. 194864015 2.50 0.00 0 157.62 M/s Rezwanul Haque Biplob,Pirgonj, Thakurgaon. 149.74 01/01/1900 12/10/2018 22/12/2019 100 149.63 0 17/09/2023 Final Bill
279 RDRIIP-2/W-VRA-188 Improvment of Nekmorod Boropukur R&H-Durlabepur kodompukur Road(Ch.00-1300m). ID No-194864059 RDRIIP2 ranisankail ID No-194864059 1.30 0.00 0 105.09 M/S Saud Traders,Munshipara,Dinajpur 99.84 01/01/1900 23/01/2019 01/01/2020 100 99.67 0 17/09/2023 Final Bill
280 RDRIIP-2/W-VRA-249 A) Improvement of Birashi hat-Routhnogarh hat via Kulik River Road (Ch 3000-3800m) ID No. 194864072B) Improvement of Ranisankail H/Q (Bondar hat)-Birashi hat Road at ch. 2400-3400m ID No. 194864029Under Ranisankail Upazila, Dist:- Thakurgaon RDRIIP2 ranisankail ID No. 194864072 ID No. 194864029 1.80 0.00 0 124.29 Ram Babu Gudribazar Thakurgaon 124.15 01/01/1900 07/08/2019 04/08/2020 100 124.14 0 17/09/2023 Final Bill
281 RDRIIP-2/W-VRA-250 A) Improvement of KD Girls School Mor-Bakradangi Eidga mat via Primiuam sead Ltd Road Ch(800-1800m) ID No. -1948640236 B) Improvement of Rampurhat R&H –Gazirhat UZR via Jowgahat Road (Ch 4100-5100m) ID No. 194864028.. Under Ranisankail Upazila, Dist:- Tha RDRIIP2 ranisankail ID No. -1948640236 ID No. 194864028 2.00 0.00 0 156.12 M H Corporation, Boda, Panchaghor 156.01 01/01/1900 14/08/2019 31/05/2021 100 155.99 0 17/09/2023 Final Bill
282 RDRIIP-2/W-VRB-023 a) Improvement of Gangua Pry school patgaon Road at ch. 00-1000m ID No.194865032 under Ranisankail Upazila, Dist:- Thakurgaon b) Improvement of Dhamor Jhonogaon via Bhadail Lathuar bari Road at ch. 00-1310m ID No.194865180 under Ranisankail Upazila, Di RDRIIP2 ranisankail ID No.194865032 ID No.194865180 2.31 0.00 0 162.53 Mrs. Rahana Shingpara, Salandor, Thakurgaon 154.40 01/01/1900 11/06/2018 15/05/2019 100 154.36 0 17/09/2023 Final Bill
283 RDRIIP-2/W-VRB-024 a) Improvement of Gogor bazar Uttar para Jame Mosque via kalam house Road at ch. 00-1058m ID No.194865157 b) Improvement of Hatpukur Pacca road Maradhar President khamar via Rajdighi Road at ch.500-1500m ID No.194865171 under Ranisankail Upazila Dist:Thak RDRIIP2 ranisankail ID No.194865157 ID No.194865171 2.06 0.00 0 130.89 M.Ehteshamul Haque, Jail Road, Dinajpur 124.35 01/01/1900 11/06/2018 08/12/2018 100 124.11 0 17/09/2023 FInal Bill
284 RDRIIP-2/W-VRB-022 Improvement of Goliapara kashidanga via Bottoli hat Road at ch. 2500-4000m ID No.194865045 under Ranisankail Upazila, Dist:- Thakurgaon (Tender ID. 186100) RDRIIP2 ranisankail ID No.194865045 1.50 0.00 0 104.64 M/s Dipu Enterprise, Hazipara, Thakurgaon 99.40 01/01/1900 20/06/2018 28/04/2019 100 99.27 0 17/09/2023 Final bill
285 RDRIIP-2/W-VRB-104 A) Improvement of Graveyeard R&H - Sirazul Ghunti via Bongano volapara GPS Road at ch. 2600-3100m ID. No. 194865026 B) Improvement of Sandharai MP para Clinic more - Sandharai Uttortola via N/H of Baki- Babor Road at ch. 00-1840m ID. No. 194865036C) Im RDRIIP2 ranisankail ID. No. 194865026 ID. No. 194865036 ID. No. 194865078 ID. No. 194865181 3.87 0.00 0 237.37 Md Khairul Kabir Rana SMC Road Guptopara Rangpur 213.04 01/01/1900 15/11/2018 20/09/2021 100 212.28 0 17/09/2023 Final bill
286 RDRIIP-2/W-VRB-141 A)Improvment of Nekmorod Mazar-Jaduar Road(Ch.1010-1440m).ID No-194865012B) Improvment of Sandaray Satghoria -Kulik river Road(Ch.00-1047m) ID No-194865065C) Improvement of Gandogram Ibrahim member House- Jaduar UZR Road (Ch.500-723m) ID No-194865084 RDRIIP2 ranisankail ID No-194865012 ID No-194865065 ID No-194865084 1.70 0.00 0 138.08 M/S Central Engineering Works,Horihorpur ,Rohimanpur,Thakurgaon Road,Thakurgaon 131.17 01/01/1900 20/01/2019 25/11/2020 100 131.06 0 17/09/2023 Final Bill
287 RDRIIP-2/W-VRB 195 A) Improvement of Tojam brick field – Bhotharam house via Nadabari Dr. para Road at ch 500-1000m ID No. 194865120 B) Improvement of Amjuan Chowrasta more – Madhabpur Sankor Ray Road at ch 830-1835m ID No. 194865152. C) Improvement of Ghoghodara R&H – RDRIIP2 ranisankail ID No. 194865120 ID No. 194865152. ID No. 194865092. 2.55 0.00 0 200.51 Rafique construction(PVT) Co.Ltd 18/1 Nayapalton, Dhaka 200.41 01/01/1900 14/08/2019 13/08/2020 100 200.29 0 17/09/2023 Final bill
288 RDRIIP-2/W-VRB 194 Improvement of Fakirgonj Road (Dianagaor hat) – Kathaldangi hat (Bhutdangi ghat) Road (BOP Road) at ch 1500-4695m ID No. 194865038. under Ranisankail Upazila Dist-Thakurgaon. RDRIIP2 ranisankail ID No. 194865038 3.20 0.00 0 259.73 M H Corporation, Boda, Panchaghor 259.49 01/01/1900 14/08/2019 03/05/2021 100 259.43 0 17/09/2023 Final Bill
289 RDRIIP-2/W-VRB-242 Improvement of Nutor-Vhornia Hat Road at Ch. 500-2785m under Ranisankail Upazila, District: Thakurgaon [Road ID -194865004] RDRIIP2 ranisankail ID -194865004 2.29 0.00 0 183.96 M/S Shuvo Saw Mill Shingpara,Thakurgaon 174.76 01/01/1900 22/06/2022 100 174.74 0 17/09/2023 Final Bill
290 RDRIIP-2/W-SCH-31 A) Improvement of Lehemba Govt Primary School Connecting Road. School Code-102040403(Ch. 1410-2410m) Under Ranishainkol Upozila, Thakurgaon.B) Improvement of Bhornia Govt Primary School Connecting Road. School Code-102040103(Ch. 1500-2500m) Under Ranisha RDRIIP2 ranisankail School Code-102040403 School Code-102040103 2.00 0.00 0 149.73 M H Corporation, Boda, Panchaghor 123.25 01/01/1900 23/07/2019 29/06/2020 100 120.45 0 17/09/2023 Finall Bill
291 RDRIIP-2/W-BRI-046 Construction of 135.00m Long PSC Girder Bridge on Birashi hat-Routhnogarh hat over Kulik River Road at Ch. 3400m under Ranisankail Upazila, District: Thakurgaon [Road ID-194864072] RDRIIP2 ranisankail ID-194864072 135.00 0 1566.37 Development Construction Ltd. 1465.22 01/01/1900 26/05/2022 16/11/2023 0 0.00 0 17/09/2023  
292 RDRIIP-2/W-UNR-061 A) Improvement of Mohammedpur UP office - P- Mohammedpur hat Road ch. 3090-4400m under Sadar Upazila, Dist:- Thakurgaon ID No.194943034 B) Improvement of Dhalorhat - Akhanagar UP (Dhalorhat - Madhabpur) Road ch. 500-2000m under Sadar Upazila, Dist:- RDRIIP2 thakurgaon-s ID No.194943034 ID No.194943005 2.81 0.00 0 186.02 M/s Risha Enterprise Baliadangi, Thakurgaon 176.72 01/01/1900 03/07/2018 14/02/2019 100 176.56 0 17/09/2023 Final Bill
293 RDRIIP-2/W-UNR-077 Improvement of Chilarang UP Office - Farabari GC via Bokesh hat, Akhanagar Rail Station Bazar Road at ch.00 - 48 & 190-1650m under Sadar Upazila, Dist:- Thakurgaon ID No.194943028, Package No-RDRIIP-2/W-UNR-077 (Tender ID 201406) RDRIIP2 thakurgaon-s ID No.194943028, 1.50 0.00 0 122.58 Md, Humaun Kabir, Kalibari, Thakurgaon. 116.45 01/01/1900 24/07/2018 12/06/2019 100 116.26 0 17/09/2023 Final Bill
294 RDRIIP-2/W-UNR-078 Improvement of Salandar UP Office - Thakurgaon Town (Senua bazar) Road at ch.00 - 1500m under Sadar Upazila, Dist:- Thakurgaon ID No.194943042 Package No-RDRIIP-2/W-UNR-078(Tender ID 201407) RDRIIP2 thakurgaon-s ID No.194943042 1.50 0.00 0 101.99 Sahida Begum, Asrampara, Thakurgaon 96.89 01/01/1900 23/07/2018 05/12/2018 100 96.83 0 17/09/2023 Final Bill
295 RDRIIP-2/W-UNR-080 Improvement of Jagannathpur UP Office - kalitola Bazar Road at ch.2000-4000m under Sadar Upazila, Dist:- Thakurgaon ID No.194943044, Package No-RDRIIP-2/W-UNR-080 (Tender ID 201409) RDRIIP2 thakurgaon-s ID No.194943044, 2.00 0.00 0 150.56 Naraon Devi, Gudribazar, Thakurgaon. 143.04 01/01/1900 19/07/2018 07/03/2019 100 142.92 0 17/09/2023 Final Bill
296 RDRIIP-2/W-UNR-105 a) Akcha UP Offie-Cheradangi Bazar Road (ch 1000-1700m) ID No.194943041 b) Improvement of Chowdary Bazar –Thakurgaon Dist H/Q Road (ch 00-1565m) ID No.194943013c) Improvment of Mohammedpur UP office-P Mohammedpur Hat Road (Ch.1590-3090m).ID No-194943034 RDRIIP2 thakurgaon-s ID No.194943041 ID No.194943013 ID No-194943034 3.77 0.00 0 278.04 MH-RI JV Bazar Para Thakurgaon 244.12 01/01/1900 24/12/2018 31/12/2019 100 210.84 0 17/09/2023 Final Bill
297 RDRIIP-2/W-UNR-001 Improvement of Beragaon UP- Depipur UP office Road (Ch:00-1500) RDRIIP2 thakurgaon-s   1.50 0.00 0 106.33 Md.Bazlur Rahman.Thakurgaon Road Thakurgaon. 101.01 01/01/1900 16/10/2018 17/09/2019 100 100.84 0 17/09/2023 Final Bill
298 RDRIIP-2/W-UNR-130 a)Improvment of Shabdal hat-Shukanpukur UO Office Road(Ch.3000-5180m).ID No-194943023b) Improvment of Rajagaon UP Office-Atowari Road (Ch.1000-2795m).Id No194943037 RDRIIP2 thakurgaon-s ID No-194943023 Id No194943037 3.98 0.00 0 203.71 Rafique construction(PVT) Co.Ltd 18/L Naya Palton Dhaka -1000 344.59 01/01/1900 08/01/2019 26/11/2019 100 341.50 0 17/09/2023 Final Bill
299 RDRIIP-2/W-UNR-164 A) Improvement of Dinajpur NHW-Khochabari GC via Nargun UP Office Road at ch. 00-3000m ID. No. 194943019 Under Sadar Upazila, Dist:- Thakurgaon. RDRIIP2 thakurgaon-s ID. No. 194943019 3.00 0.00 0 219.84 Ram Babu, Guduribazat, Thakurgaon 174.70 01/01/1900 12/05/2019 11/08/2019 100 174.67 0 17/09/2023 Final Bill
300 RDRIIP-2/W-VRA-001 a) Improvement of Bhelazan-Dangi hat Road ch. 1000-2000m under Sadar Upazila, Dist:- Thakurgaon ID No.194944049 b) Improvement of Akhanagar Dhonipara Cmmunity School Velarhat Road ch. 00-1462m under Sadar Upazila, Dist:- Thakurgaon ID No.194944116,( RDRIIP2 thakurgaon-s ID No.194944049 ID No.194944116 2.46 0.00 0 178.33 Sankar Babu, Guduribazar, Thakurgaon 169.41 01/01/1900 23/05/2018 25/03/2019 100 168.81 0 17/09/2023 Final bIll
301 RDRIIP-2/W-VRA-002 a) Improvement of Fershadangi hat-Arazi Matrigaon Road ch. 00-700m under Sadar Upazila, Dist:- Thakurgaon ID No.194944063 b) Improvement of Shibganj Amtoli RHD-29 mail hat Road ch. 10975-12475m under Sadar Upazila, Dist:- Thakurgaon ID No.194944077, 9 RDRIIP2 thakurgaon-s ID No.194944063 ID No.194944077 2.20 0.00 0 167.43 Jui Hossain, Bazarpara, Thakurgaon 159.06 01/01/1900 30/05/2018 06/06/2019 100 137.64 0 17/09/2023 Final bIll
302 RDRIIP-2/W-VRA-003 Improvement of Kumapara-Kalikagaon via Ebar Uddin Chairman house Road ch. 00-2050m under Sadar Upazila, Dist:- Thakurgaon ID No.194944136, (Tender ID. 180186) RDRIIP2 thakurgaon-s ID No.194944136 2.05 0.00 0 167.33 Sahida Begum, Asrampara, Thakurgaon 158.96 01/01/1900 23/05/2018 20/02/2019 100 158.58 0 17/09/2023 Final Bill
303 RDRIIP-2/W-VRA-067 Improvement of Shibganj Amotoli RHD-29 mail hat Road at Ch. 32000 - 5590m under Sadar Upazila, Dist:- Thakurgaon ID No.194944077, Package No- RDRIIP-2/W-VRA-067 (Tender ID 201405) RDRIIP2 thakurgaon-s ID No.194944077 2.39 0.00 0 175.91 Sahida Begum, Asrampara, Thakurgaon 167.11 01/01/1900 23/07/2018 11/05/2019 100 166.91 0 17/09/2023 Final Bill
304 RDRIIP-2/W- VRA-109 Improvement of Akhanagar Bolitapara Adarsha Madrasha - khulifapara pucca Road Ch.00 - 2055m under Sadar Upazila, Dist:- Thakurgaon ID No.194944115 (Tender ID 201417) RDRIIP2 thakurgaon-s ID No.194944115 2.06 0.00 0 146.13 M/s Monowara Hasking Mill, Baliadangi, Thakurgaon. 138.83 01/01/1900 14/08/2018 17/06/2019 100 138.33 0 17/09/2023 Final Bill
305 RDRIIP-2/W- VRA-108 A) Improvement of Puratan Goreya - Purba Sukanpukuri Road Ch.6900- 8000m under Sadar Upazila, Dist:- Thakurgaon ID No.194944007B) Improvement of Dehon High School - Motra high School Road Ch.00- 1500m under Sadar Upazila, Dist:- Thakurgaon ID No.19494 RDRIIP2 thakurgaon-s ID No.194944007 ID No.194944025 2.60 0.00 0 178.72 Md. Emrus Hauqe, Thakurgaon road, Thakurgaon. 169.79 01/01/1900 08/08/2018 28/08/2020 100 171.08 0 17/09/2023 Final Bill
306 RDRIIP-2/W- VRA-110 Improvement of Dholar hat road (Sannayasi par) - tangon River Barrage Road Ch.5100 - 7200m under Sadar Upazila, Dist:- Thakurgaon ID No.194944038. (Tender ID 201419) RDRIIP2 thakurgaon-s ID No.194944038. 2.10 0.00 0 131.57 M/s Moutushy Enterprise, Bus Stand, Thakurgaon 124.99 01/01/1900 28/08/2018 03/04/2019 100 124.65 0 17/09/2023 Final Bill
307 RDRIIP-2/W- VRA-111 Improvement of Mathurapur Public High Schllo - Bhoularhat (Simultola) Road Ch.00 - 1370m under Sadar Upazila, Dist:- Thakurgaon ID No.194944174 (Tender ID 201421) RDRIIP2 thakurgaon-s ID No.194944174 1.37 0.00 0 103.31 Md, Lablu, NC Road Thakurgaon. 98.15 01/01/1900 06/08/2018 24/11/2018 100 98.07 0 17/09/2023 Final Bill
308 RDRIIP-2/W- VRA-112 Improvement of Danar hat - Sardarpara Morh - Ferozipara Road Ch.00 - 1500m under Sadar Upazila, Dist:- Thakurgaon ID No.194944104 (Tender ID 201422) RDRIIP2 thakurgaon-s ID No.194944104 1.50 0.00 0 106.88 M/s Dilruba akhter Sorna, Kalibari Thakurgaon 101.54 01/01/1900 02/08/2018 30/04/2019 100 100.47 0 17/09/2023 Final Bill
309 RDRIIP-2/W-VRA-149 A) Improvement of Golim Bobur hat-Nilar hat Road (Ch. 2650-4150m). ID No- 194944097 B) Improvement of Egaro Mile Shafiuddin Foundation- khokishakuri prodhanpara Road (Ch. 00-1500m). ID No- 194944251C) Improvement of Rajarampur GPS - Darajgaon Road ( RDRIIP2 thakurgaon-s ID No- 194944097 ID No- 194944251 ID No- 194944247 ID No- 194944042 ID No- 194944072. 6.00 0.00 0 408.52 MH-RI JV Bazar Para Thakurgaon 363.18 01/01/1900 24/12/2018 31/12/2019 100 277.60 0 17/09/2023  
310 RDRIIP-2/W VRA-175 A) Improvement of munsir hat NHW-sabdal hat road( Ch.00-1500m) ID.194944074B) Improvement of vulli luxmirhat UNR(Sujalipara)-Bhully -Farabari UZR (H/O khairul dr.) via azizul haji house road (Ch.2390-3000m)ID-194944245C) Improvement of Turukpathar hat-Zat RDRIIP2 thakurgaon-s ID.194944074 ID-194944245 ID. No. 194944071 3.71 0.00 0 288.10 AHM Sadekul Islam Asrompara Thakurgaon 287.75 01/01/1900 03/01/2019 25/04/2019 100 287.62 0 17/09/2023 Final Bill
311 RDRIIP-2/W-VRA-221 A) Improvement of Sashla Piala-Milanpur Road ch. 00-1500m ID. No. 194944016 Under Sadar Upazila, Dist:- ThakurgaonB) Improvement of Salandar Radio Centre pucca road-Alam Chowdhury Firm via Nazrul Member house Road at ch. 00-1500m ID. No. 194944223 Under RDRIIP2 thakurgaon-s ID. No. 194944016 ID. No. 194944223 3.00 0.00 0 278.22 Hori Ram, GuduriBazar, Thakurgaon 218.12 01/01/1900 09/05/2019 30/06/2020 100 217.93 0 17/09/2023 Final Bill
312 RDRIIP-2/W-VRA-222 A) Improvement of Mascantapara Choturcvuz bazar-Bhully Panchpir Pucca road via Kandorpara Reg. Pry. School Road at ch. 1200-2700m ID. No. 194944209 Under Sadar Upazila, Dist:- Thakurgaon. B) Improvement of Shanti Bania Morh of Dholor hat -Rajagaon UP road RDRIIP2 thakurgaon-s ID. No. 194944209 ID. No. 194944153 3.00 0.00 0 223.07 Ram Babu, Guduribazat, Thakurgaon 177.12 01/01/1900 09/05/2019 15/06/2020 100 175.19 0 17/09/2023 Finall bill
313 RDRIIP-2/W-VRA-273 Improvement of Begrot GPS to Bonkoki Jhatibhanga Pucca Road via Pathanpara and Pathraj River Road at Ch.3253m to 4753m Road Id No-194944203Improvement of Thakurgaon Police line to Valukai Road at Ch.685m to685m Road Id No-194944085 Under Sadar Upazila, Di RDRIIP2 thakurgaon-s Id No-194944203 Id No-194944085 2.50 0.00 0 230.17 B&S (jv), Collage Road ,Thakurgaon. 184.45 01/01/1900 01/04/2020 29/03/2021 100 183.19 0 17/09/2023 Final Bill
314 RDRIIP-2/W-VRA-290 Improvement of Danarhat-Balapara GPS via Hatidova Morh Road at Ch. 00-1000m under Thakurgaon-S Upazila District: Thakurgaon [Road ID-194944134] RDRIIP2 thakurgaon-s ID-194944134 1.00 0.00 0 79.70 Md. Firoj Biswas Rahimanpur,Thakurgaon 75.71 01/01/1900 08/02/2022 22/06/2022 0 75.71 0 17/09/2023 Final Bill
315 RDRIIP-2/W-VRB-001 a) Improvement of Taltoli-Sutapir Madhupur Road ch. 1600-2600m under Sadar Upazila, Dist:- Thakurgaon ID No.194945009 b) Improvement of Motra hat-Balia Dangi Border Road via house of Nurul Islam Chairman Road ch. 00-1000m under Sadar Upazila, Dist:- Th RDRIIP2 thakurgaon-s ID No.194945009 ID No.194945217 2.00 0.00 0 140.11 M/s Mowli Enterprise, Thakurgaon Road, Thakurgaon 133.11 01/01/1900 30/05/2018 20/11/2018 100 132.73 0 17/09/2023 Final Bill
316 RDRIIP-2/W-VRB-002 a) Improvement of Araji Fakdanpur-Bhoular hat Road ch. 00-1000m under Sadar Upazila, Dist:- Thakurgaon ID No.194945188 b) Improvement of Rajagaon UP-Asannagar Road ch. 00-1000m under Sadar Upazila, Dist:- Thakurgaon ID No.194945104, (Tender ID 180183) RDRIIP2 thakurgaon-s ID No.194945188 ID No.194945104 2.00 0.00 0 138.00 Md. Aynul Haque, Kalibari Thakurgaon 131.10 01/01/1900 27/05/2018 14/05/2019 100 130.97 0 17/09/2023 Final Bill
317 RDRIIP-2/W-VRB-046 A) Improvement of Sialdangi hat Pucca Road - H/O yousuf Road ch. 00-920m under Sadar Upazila, Dist:- Thakurgaon ID No.194945238, B) Improvement of Ruhia RHD - Kajipara pry. school Road ch. 00-1000m under Sadar Upazila, Dist:- Thakurgaon ID No.1949 RDRIIP2 thakurgaon-s ID No.194945238, ID No.194945187 1.92 0.00 0 128.57 M/s Tabib Labib Brothers 122.14 01/01/1900 08/07/2018 14/02/2019 100 122.04 0 17/09/2023 Final Bill
318 RDRIIP-2/W-VRB-133 A) Improvement of Bhully hat Farabari hat road -Auliapur GPS Road ch. 00-1000m ID. No. 194945122 Under Sadar Upazila, Dist:- ThakurgaonB) Improvement of Debipur Mujaborni Sarkarpara Zame Mosque-Munshir hat H/Q Quddus Road ch. 00-530m ID. No. 194945375 Un RDRIIP2 thakurgaon-s ID. No. 194945122 ID. No. 194945375 ID. No. 194945318 2.13 0.00 0 171.32 MB Motors Goalpara Thakurgaon 162.75 01/01/1900 03/01/2019 10/12/2019 100 160.87 0 17/09/2023 Final bill
319 RDRIIP-2/W-VRB-168 A) Improvement of Aladir hat-basgara Road at ch. 00-1000m ID. No. 194945135 Under Sadar Upazila, Dist:- Thakurgaon. B) Improvement of Singia Nurgundegi-Birganj Road at ch. 00-1400m ID. No. 194945090 Under Sadar Upazila, Dist:- Thakurgaon RDRIIP2 thakurgaon-s ID. No. 194945135 ID. No. 194945090 2.40 0.00 0 196.59 Ram Babu, Guduribazat, Thakurgaon 156.09 01/01/1900 12/05/2019 100 0.00 0 17/09/2023 Final Bill
320 RDRIIP-2/W-VRB-175 A) Improvement of Motra hat - Baliadangi Border road via house of Nurul Islam Chairman Road at ch. 1000-1690m ID. No. 194945217 Under Sadar Upazila, Dist:- Thakurgaon. RDRIIP2 thakurgaon-s ID. No. 194945217 0.69 0.00 0 51.19 Mrs Fouziara Begum,Shibgonj Thakurgaon 48.63 01/01/1900 04/04/2019 15/03/2020 100 53.77 0 17/09/2023 Final Bill
321 RDRIIP-2/W-VRB-243 Improvement of Boda Atwari pucca Road-Rangiani hat Road at Ch. 00-1000m under Thakurgaon-S Upazila, District: Thakurgaon [Road ID -194945373] RDRIIP2 thakurgaon-s ID -194945373 1.00 0.00 0 86.87 M/S Risha Enterprise Baliadangi,Thakurgaon 82.52 01/01/1900 23/06/2022 100 82.49 0 17/09/2023 Final Bill
322 RDRIIP-2/W-VRB-245 Improvement of Salandar pucca Road-Arazi sing para Road at Ch. 00-1000m under Thakurgaon-S Upazila, District: Thakurgaon [Road ID -194945043] RDRIIP2 thakurgaon-s Road ID -194945043 1.00 0.00 0 79.23 Ripon Trading Cor. Islambag,Thakurgaon 75.27 01/01/1900 20/02/2022 24/10/2022 100 75.20 0 17/09/2023 Final Bill
323 RDRIIP-2/W-SCH-04 A) Improvement of Parkhupia Govt. Primary School Connecting Road. School code-10201061001 B) Improvement of Boro Balia Govt. Primary School Connecting Road.School code-10201050601 C) Improvement of Boguladangi Govt. Primary School Connecting Road. S RDRIIP2 thakurgaon-s School code-10201061001 School code-10201050601 School code-10201050301 School code-10201080702. 3.10 0.00 0 223.52 Rofique Construction pvt Ltd18/1 Nayapolton Dhaka-1000 194.52 01/01/1900 15/11/2018 21/11/2019 100 193.56 0 17/09/2023 Final Bill
324 RDRIIP-2/W-SCH-30 Improvement of Boalia Govt Primary School Connecting Road. School Code-10201020402(Ch. 1990-2690m) Under Sadar, Upozila, Thakurgaon. RDRIIP2 thakurgaon-s School Code-10201020402 0.70 0.00 0 50.41 Bhai Bhai Husking mill, Baliadangi, Thakurgaon 47.89 01/01/1900 20/05/2019 14/05/2020 100 47.84 0 17/09/2023 Final Bill
325 RDRIIP-2/W-SCH-59 Improvement of Fakdanpur-Paharbhanga Govt. Primary School Connecting Road at Ch. 11200-12200m under Thakurgaon-S Upazila District: Thakurgaon [School Code-10201070801] RDRIIP2 thakurgaon-s School Code-10201070801 1.00 0.00 0 79.63 Md. Khairul Islam Roman Chanmaripara,Thakurgaon 75.65 01/01/1900 20/05/2019 25/05/2020 100 75.53 0 17/09/2023 Final Bill
326 RDRIIP-2/W-BRI-001 Re-Construction of 70.09m Long RCC Girder Bridge at Senua on Thakurgaon-Ranirbandar hat Road at ch. 375m under Sadar Upazila Dist:Thakurgaon ID 1949452005 (Tender ID No. 181869) RDRIIP2 thakurgaon-s ID 1949452005 70.09 0 306.19 Mr Hariram, Guduribazar, Thakurgaon 270.14 01/01/1900 07/06/2018 15/08/2019 100 261.67 0 17/09/2023 Final bill Paid.
327 RDRIIP-2/W-BRI-003 Construction of 98.10m Long PC Girder Bridge over Tangon River on Collegepara -Ruhia UZR Road at ch. 1600m ID. No. 194944270 Under Sadar Upazila, Dist: Thakurgaon. RDRIIP2 thakurgaon-s ID. No. 194944270 98.10 0 743.89 Md Younus &Brothers (Pvt)Ltd.A.S.Tower(8th Floor Road -01 Plot553 Hillvew R/A Panchlish.Chottogram 680.41 01/01/1900 22/11/2018 14/10/2019 100 680.22 0 17/09/2023 Final Bill
328 RDRIIP-2/W-BRI-002 Construction of 50.00m Long PC Girder Bridge over Pathraj River on Kumarpara - Kalikagaon via Ebar Uddin Chairman House Road at ch. 2150m ID. No. 194944136 Under Sadar Upazila, Dist: Thakurgaon. RDRIIP2 thakurgaon-s ID. No. 194944136 50.00 0 429.59 Md Younus &Brothers (Pvt)Ltd.A.S.Tower(8th Floor Road -01 Plot553 Hillvew R/A Panchlish.Chottogram 383.38 01/01/1900 22/11/2018 17/12/2020 100 383.37 0 17/09/2023 Final bill
329 RDRIIP-2/W-BRI-015 Construction of 90.10m Long PC Girder Bridge over Tangonj River on RajagaonUP-Asannagor Road at ch. 2500m ID. No. 194945104 Under Sadar Upazila, Dist: Thakurgaon. RDRIIP2 thakurgaon-s ID. No. 194945104 90.10 0 603.50 DC-JH JV, Thakurgaon 526.45 01/01/1900 14/05/2019 20/05/2020 100 526.25 0 17/09/2023 Final bill
330 RDRIIP-2/W-CUL-04 Costruction of 2X3.00X2.50m RCC Box Culvert on Chilarang UP office to Farabari GC Via Bokesh hat Akhanagar rail station Bazar Road at Ch. 7507m.ID No-194943028 RDRIIP2 thakurgaon-s ID No-194943028 6.00 0 18.41 M/S Jali Enterprize, Shantinagar, Thakurgaon 17.49 01/01/1900 15/03/2020 25/05/2021 100 17.49 0 17/09/2023 Final Bill
331   Costruction of 1X2.00X1.50m RCC Box Culvert on Mohammadpur UP office- P-Mohammadpur hat Road at Ch.1760m . Id No-194943034Costruction of 2X3.00X2.50m RCC Box Culvert on Golim Babur hat to Nilar hat road at Ch.5200m. Id No-194944097 Under Sadar Upazila, Di RDRIIP2 thakurgaon-s Id No-194943034 Id No-194944097 8.00 0 25.79   24.50 01/01/1900 100 24.49 0 17/09/2023  
332 RDRIIP-2/W-CUL-08 1) Construction of 01 No 3x4.50mx3.00m RCC box culvert on Dogachi hat-Chilarang UP Office Road at Ch.1983m under Thakurgaon-S Upazila, District: Thakurgaon [Road ID -194943029] 2) Construction of 02 Nos 2x4.00mx2.50m RCC box culvert on Shibganj GC-Choto K RDRIIP2 thakurgaon-s ID -194942013] 3 37.50 0 141.04 Md.Younus Ali Birampur,Dinajpur 133.99 01/01/1900 17/02/2022 16/02/2023 100 133.99 0 17/09/2023 Final bill
333 RDRIIP-2/W-HAT-006 A) Improvment of Patiadangi Hat. B) Improvment of Rongiani Hat RDRIIP2 thakurgaon-s   2.00 0.00 0 77.94 Md.Humaun Kabir,Kalibari ,Thakurgaon 74.06 01/01/1900 04/04/2019 10/04/2020 100 73.98 0 17/09/2023 Final
334 RDRIIP-2/W-MAI-019 Periodic Maintenance of Road from Hatpara Madrasha (Kornai) - Chaindaria (Nakkarhat) Road from Ch. 00m - 3260m under Pirganj Upazila, District-Thakurgaon [Road ID-194824007] Package: RDRIIP-2/W-MAI-019 RDRIIP2 thakurgaon-s ID-194824007 3.20 0.00 0 37.85 M/S Souronil Const. Sujalpur,Dinajpur 35.96 01/01/1900 09/01/2022 24/04/2022 100 35.94 0 17/09/2023 Final
335 RERMP-3/TH AKUR/W-02 Maintenance of Rural Roads Thakurgaon() RERMP-3 thakurgaon-s N/A 36 1934.50 N/A 1934.50 40 709.00 36 26/12/2021 Ongoing
336 SP24183 Amandhaman Khal Subpoject:Construction of Amandhaman Khal WRS (at Ch.6+200km), Re-excavation of Amandhaman Khal (Ch.0+000km to Ch. 14+800 km) SSWRDP-JICA-2 baliadangi   14.80 0.00 0 334.58 LCS 0.00 01/01/1900 100 0.00 0 30/06/2020 On going
337 W.209 Construction of Barabari UP Complex UCCP-2 baliadangi 100 87.57 83.18 25/09/2013 28/12/2014 100 83.18 100 26/08/2020 Final
338 W.293 Construction of 6 no Bhaturia UP Complex UCCP-2 haripur 100 87.18 82.82 25/03/2014 30/06/2016 100 82.58 100 26/08/2020 Final
339 W.174 Construction of Dangipara UP Complex UCCP-2 haripur 100 88.08 87.96 03/03/2015 30/06/2016 100 87.62 100 26/08/2020 Final
340 W.325 Construction of 1 no Bhomradah UP Complex UCCP-2 pirganj 100 84.49 80.26 01/08/2013 30/10/2014 100 80.23 100 26/08/2020 Final
341 005/246 Construction of BACHOR UP Complex UCCP-2 ranisankail 100 56.05 56.05 23/08/2010 100 55.53 100 09/08/2020 final
342 004/246 Construction of dharmogarh UP Complex UCCP-2 ranisankail 100 58.96 58.96 25/11/2009 30/04/2011 100 58.77 100 09/08/2020 final
343 003/246 Construction of lehamba UP Complex UCCP-2 ranisankail 100 56.05 56.05 25/02/2010 18/03/2011 100 55.69 100 09/08/2020 final
344 W.382 Construction of Dholarhat UP Complex UCCP-2 thakurgaon-s 100 94.96 87.01 12/07/2015 30/09/2016 100 86.76 100 26/08/2020 Final
345 W.344 Construction of Jamalpur UP Complex UCCP-2 thakurgaon-s 100 83.38 79.21 22/05/2013 15/10/2015 100 79.09 100 26/08/2020 Final
346 W.102 Construction of Ruhia Paschim UP Complex UCCP-2 thakurgaon-s 100 94.14 87.50 10/09/2015 01/08/2016 100 87.29 100 26/08/2020 Final
347 W.220 Construction of Salandar UP Complex UCCP-2 thakurgaon-s 100 83.30 79.13 22/05/2013 15/10/2015 100 78.99 100 26/08/2020 Final
348 002/246 Construction of balia UP Complex UCCP-2 thakurgaon-s 100 59.00 64.83 15/02/2010 31/12/2012 100 64.78 100 09/08/2020 revised & final
349 CBU-100/ Purto-152 ঠাকুরগাঁও জেলার হরিপুর উপজেলাধীন জাদুরানী জিসি-আমগাঁও ইউপি অফিস ভায়া নীলগাঁও সড়কে ১২৭৭মিটার চেইনেজে ব্রিজ নির্মাণ (রোড আইডিঃ ১৯৪৫১৩০০৬) UHBP haripur 194513006 20.00 0 233.46 Unique Construction (Pvt.) Ltd & M/S. Khan Enterprise (JV) 184.68 25/08/2021 04/12/2023 100 184.30 0 28/06/2024