Habiganj

LGED HABIGANJ , District Scheme Details

Project Name
Upazila

District Scheme Details

SL No. Package No. Package Name Project Name Upazila Name Road ID Length of Road (Km) Length of Bridge (M) Building Qauntity (No) Estimated Amount (Lac) Name of Contractor Contract Amount (Lac) Date of Contract Date of Commencement Date of Completion Physical Progress (%) Financial Progress (Amt) Financial Progress (%) Date of Progress Update Remarks
1 CRMIDP/HBG/W-373 Mohashoyer Bazar CRMIDP bahubal 46 235.00 "M/S Md. Abdulla-M/S Md. Abdur Rahman Rupa Villa, College Quarter’s Habiganj. " 219.33 06/07/2022 04/07/2022 55 100.00 46 27/07/2022
2 CRMIDP/HBG/W-371 Puraikhola Bazar CRMIDP habiganj-s 73 286.00 Md.Mizanur Rahman Shamim 261.69 19/07/2022 29/06/2022 75 190.00 73 27/07/2022
3 CRMIDP/HBG/W-378 Paniumda Bazar CRMIDP nabiganj 367.00 M/S Mortuja Hasan 350.34 15/07/2021 05/07/2022 20 27/07/2022
4 UMC/HAB/14/C-141 Construction of Upazila Muktijuddah Complex Bhabn CUMCP azmiriganj 70 274.50 FR-MH(JV) 296.15 09/11/2014 16/11/2014 30/06/2015 80 181.17 70 30/09/2015
5 UMC/HAB/14/C-159 Construction of Upazila Muktijuddah Complex Bhaban CUMCP nabiganj 201.51 RAN Enterprise 198.48 15/01/2015 24/01/2015 30/06/2015 0 30/09/2015 Land Problem
6 W03 Pakuria battala Asampara bazar via khatamara saizzar ferryghat Road FDDRIRP chunarughat 636262004 12.11 71293057.00 M/S Hasan Enterprise, T.A Road, Brahmanbaria 66914472.63 24/01/2019 24/01/2019 14/08/2019 30 106.27 23/08/2020 Time Expired
7 FDR/Hab/18-19/UZR/W01 Rehabilitation of Dhuliakhal-Mirpur Road (sadar Part) FDDRIRP habiganj-s 636442006 7.45 100 641.41 M/S. Niaz Traders, 154, Matijeel Commercial Area, Masjid Market(2nd Floor), Room No. 301-303, Dhaka-1000 597.06 25/08/2018 25/08/2018 09/06/2019 100 597.06 100 23/08/2020 Completed
8 BW04 Chatian bazar-Bagasura Bazar-Shahajibazar road FDDRIRP madhabpur 636712011 0.01 100 8975867.00 M/S Jobeda Enterprise, Lanzapara, Shaistaganj, Habiganj 8527073.65 09/01/2019 09/01/2019 14/08/2019 100 834.00 100 23/08/2020 Completed
9 FDR/HAB/18-19/BW05 Jagodishpur - Temunia - Shahajibazar road Ch 7480m to 7505m FDDRIRP madhabpur 636712003 25.00 152.43 M/S. Mostafa Kamal, Niaz park, Kawtali, Brahmanbaria 142.20 09/09/2019 09/09/2019 09/08/2020 65 23/08/2020 On going
10 FDR/HAB/18-19/BW06 Surma R&H-Montala-Chowmuhani bazar road ch 2334m, to 2359m FDDRIRP madhabpur 636712009 25.00 226.35 Md. Mizarur Rahman Shamim Nasratpur, Habiganj 205.59 12/08/2019 12/08/2019 12/07/2020 55 105.10 23/08/2020 On going
11 FDR/HAB/19-20/BW07 Surma R&H-Montala-Chowmuhani bazar road ch 6160m to 6185m FDDRIRP madhabpur 636712009 22.00 0 243.34 M/S Hasan Enterprise, T.A Road, Brahmanbaria 212.70 19/04/2020 19/04/2020 18/04/2021 0 0.00 0 23/08/2020
12 FDR/Hab/18-19/UZR/W02 Rehabilitation of Nabigonj-Rudra Gram Road. FDDRIRP nabiganj 636772007 10.04 100 908.71 M/S Hassan Builders - Mizanur Rahman Shamim JV, Nasratpur Habiganj 851.92 05/12/2018 05/12/2018 18/01/2020 100 851.92 100 23/08/2020 Completed
13 GSIDP/HOB/DW-5 Improvement of Kabirpur Eidgah under 9 No Pukra Union, Latitude: 24.403741, Longitude: 91.406310] GSIDP baniachong 53.82 M/S Maa Traders 0.00 04/07/2018 28/02/2019 100  
14 GSIDP/HOB/DW-6 Improvement of Athukura Graveyard. under 10 No Subidpur Union, [Latitude: 24.403819, Longitude: 91.405784] GSIDP baniachong 11.12 M/s Shadi Traders 0.00 04/07/2018 28/02/2019 100  
15 GSIDP/HOB/DW-7 Improvement of Askarullah Mosque at Jatrapasha Village. Under 4 no Baniachong-South-West Union, [Latitude: 24.509179, Longitude:91.34990 GSIDP baniachong 7.31 M/S. SUYAB ENTERPRISE 0.00 04/07/2018 30/12/2018 100  
16 GSIDP/HOB/DW-8 Improvement of Mukambari Graveyard at Mukambari Village under 9 No Pukra Union, [Latitude: 24.440474, Longitude:91.418710] GSIDP baniachong 6.69 M/s Moznu Enterprise 0.00 04/07/2018 28/02/2019 100  
17 GSIDP/HOB/DW-1 Improvement of Paschim Noagaon Jame Mosque under Shankhola Union, [Latitude: 24.225427, Longitude:91.427396] GSIDP chunarughat 4.93 M/s Mamun telecom 0.00 04/07/2018 30/12/2018 100  
18 GSIDP/HOB/DW-2 Improvement of Durgapur Jame Mosque under Ubahata Union, [Latitude: 24.251956, Longitude:91.491640] GSIDP chunarughat 5.00 Md. Mohibul Islam Shahin 0.00 04/07/2018 30/12/2018 100  
19 GSIDP/HOB/DW-3 Improvement of Lalchand Durga Mondir under Shankhola Union, [Latitude: 24.239880, Longitude:91.413815] GSIDP chunarughat 5.00   0.00 04/07/2018 30/12/2018 100  
20 GSIDP/HOB/DW-4 Improvement of Nalmuk Bazar Jame Mosque under Mirashi Union, [Latitude:24.169761, Longitude:91.554414] GSIDP chunarughat 5.00 M/S Jobeda Enterprise 0.00 04/07/2018 30/12/2018 100  
21 GSIDP/HOB/DW-10 Improvement of Mohanpur Central Jame Mosque under Habigonj Pouroshava, [Latitude: 24.3690, Longitude:914124] GSIDP habiganj-s 5.00 M/S. Suyab Rnterprise, 0.00 04/07/2018 30/12/2018 100  
22 GSIDP/HOB/DW-11 Improvement of Bogla Bazar Iskcon Mondir under Habigonj Pouroshava, [Latitude: 24.3899, Longitude:91.40741822] GSIDP habiganj-s 5.00 M/S. Sumon Enterprise, 0.00 04/07/2018 30/12/2018 100  
23 GSIDP/HOB/DW-12 Improvement of Richi Airakona Graveyard under Richi Union, [Latitude: 24.366098, Longitude:91.371018] GSIDP habiganj-s 5.00 M/s Shadi Traders 0.00 04/07/2018 30/12/2018 100  
24 GSIDP/HOB/DW-13 Improvement of Shaistanagar Graveyard under Habigonj Pouroshava, [Latitude: 24.367159, Longitude:91.419231] GSIDP habiganj-s 5.00 M/S Maa Traders 0.00 04/07/2018 30/12/2018 100  
25 GSIDP/HOB/DW-14 Improvement of Rajnagar Graveyard under Habigonj Pouroshava, [Latitude: 24.380171, Longitude:91.4076960] GSIDP habiganj-s 5.00 M/s Shadi Traders 0.00 04/07/2018 30/12/2018 100  
26 GSIDP/HOB/DW-15 Improvement of Bagla Bazar Gopal Jiour Mondir under Habigonj Pouroshava, [Latitude: 24.390039, Longitude:91.414598] GSIDP habiganj-s 5.00 M/s Moznu Enterprise 0.00 04/07/2018 30/12/2018 100  
27 HFMLIP/Habi/16-17/W-119 Improvement of Kakailsow GCCR-Rasulpur Road from Ch 00-2720m by RCC HFMLIP azmiriganj 636025023 2.72 4.50 100 212.75 M/S Hasan Enterprise 174.77 15/02/2017 22/02/2017 31/05/2020 100 169.39 100 23/05/2024
28 HFMLIP/Habi/15-16/EW-79 Re-excavation of Kayerdala Khal from Jolsukha to Shibpasa at Ch 00-2370m Upazila: Ajmiriganj, District: Habigang HFMLIP azmiriganj 2.37 100 2410508.00 LCS 2410508.00 22/03/2016 30/06/2016 100 23.63 100 23/05/2024
29 HFMLIP/Habi/16-17/EW-137 Re-excavation of Shapla Khal at Upazila -Azmiriganj Dist. Habigang. HFMLIP azmiriganj 4.00 100 6438553.00 LCS 6438553.00 15/03/2017 25/11/2017 100 63.52 100 23/05/2024
30 HFMLIP/Habi/16-17/EW-146 Re-excavation of Dhangong Ganga Beel connecting khal at ch: 00-2100m under Azmiriganj Dist. Habigang. HFMLIP azmiriganj 2.10 100 3567788.00 LCS 3567788.00 19/03/2017 25/12/2017 100 14.56 100 23/05/2024
31 HFMLIP/Habi/16-17/EW-133 Re-excavation of Dhan Gang Beel Ganga Beel at Upazila -Azmirigonj, Dist. Habigang. HFMLIP azmiriganj 100 871593.00 LCS 871593.00 19/03/2017 25/11/2017 100 8.61 100 23/05/2024
32 HFMLIP/ Habi/17-18/W-219 Improvement of Azmiriganj-Paharpur Road at ch. 12000-15890m by RCC under Dist. Habiganj. (Road ID: 636022003) HFMLIP azmiriganj 636022003 3.89 16.10 46 757.61 Shahil-Mortuja (JV), Habiganj 693.78 15/04/2018 22/04/2018 04/10/2020 50 315.76 46 13/08/2020 Work is ongoing
33 HFMLIP/Habi/17-18/W-178 Improvement of Bong Road-Paddy Land Road at Ch. 2000m-5000m by RCC under , Dist. Habiganj. (Road ID: 636025006), Submergible HFMLIP azmiriganj 636025006 3.00 3.60 6 313.02 RBL-MRS JV 266.05 20/11/2017 27/11/2017 26/11/2018 100 16.31 6 13/08/2020 Work canceled
34 HFMLIP/Habi/17-18/W-252 Improvement of Paschimbag-Azmiriganj Road at ch. 5400-9030 m by RCC under Dist. Habiganj. (Road ID: 636023001) HFMLIP azmiriganj 636023001 3.63 8.20 54 484.44 M/S Hasan Enterprise 426.30 17/07/2018 01/09/2018 31/08/2019 65 230.97 54 13/08/2020 Work is ongoing
35 HFMLIP/Habi/15-16/W-63 Improvement of Kamalpur Ghat to Kamalpur primary school Road at Ch 00-2750 m by RCC ,District: Hobiganj (Road ID: 636025026), Submergible HFMLIP azmiriganj 636025026 2.75 7.80 94 214.17 Challenger & M.Hasan (JV) 194.89 12/04/2016 19/04/2016 19/04/2017 100 183.83 94 13/08/2020 FB U/P
36 HFMLIP/Habi/15-16/W-52 Improvement of Azmiriganj-Paharpur Road at Ch 6400-8600 m by RCC , District: Hobiganj (Road ID: 636022003), Submergible HFMLIP azmiriganj 636022003 2.20 5.70 100 237.73 HE-UM(JV) 215.73 23/03/2016 29/03/2016 29/03/2017 100 215.65 100 13/08/2020 Final Bill paid
37 HFMLIP/Habi/16-17/W-120 Improvement of Pirojpur-Launch Ghat-Jalshuka Bazar Road at Ch 00-2000m by RCC underDistrict:Habiganj (Road ID: 636024002) HFMLIP azmiriganj 636024002 2.00 6.00 100 159.91 LCS 159.91 13/02/2017 13/02/2017 12/10/2017 100 159.64 100 13/08/2020 FinaL Bill Paid
38 HFMLIP/Habi/16-17/W-139 Improvement of Solori-Shibpasa Road at Ch 5868-7148 m by RCC , , District: Hobiganj (Road ID: 636025035), Submergible HFMLIP azmiriganj 636025035 1.28 42 109.66 SE-MA JVC 86.04 18/05/2017 25/05/2017 30/03/2018 100 36.44 42 12/08/2020 FB U/P
39 HFMLIP/Habi/15-16/W-62 Improvement of Solori-Shibpasa Road at Ch 3000-6000 m by RCC , , District: Hobiganj (Road ID: 636025035), Submergible HFMLIP azmiriganj 636025035 3.00 4.80 100 197.15 Challenger & M.Hasan (JV) 176.52 31/05/2016 07/06/2016 06/06/2017 100 176.50 100 12/08/2020 Final Bill paid
40 HFMLIP/Habi/15-16/W-51 Improvement of Azmiriganj-Paharpur Road at Ch 4200-6400 m by RCC ,District: Hobiganj (Road ID: 636022003), Submergible HFMLIP azmiriganj 636022003 2.20 9.30 100 324.55 M/S Hasan Enterprise 264.64 23/03/2016 29/03/2016 29/03/2017 100 264.60 100 12/08/2020 Final Bill paid
41 HFMLIP/Habi/16-17/W-127 Improvement of Bong Road-Paddy Land Road from Ch 00-2000m by under District:Habiganj (Road ID: 636025006), Submergible HFMLIP azmiriganj 636025006 2.00 1.80 100 144.15 Challenger & M.Hasan (JV) 124.50 04/04/2017 11/04/2017 05/02/2018 100 124.48 100 12/08/2020 FinaL Bill Paid
42 HFMLIP/ Habi/17-18/W-173 Improvement of Azmiriganj-Paharpur Road at Ch. 8600m-12000m by RCC under Dist. Habiganj. (Road ID: 636022003) Submergible HFMLIP azmiriganj 636022003 3.40 21.10 42 727.79 Shahil-Mortuja (JV), Habiganj 669.80 12/03/2018 19/03/2018 18/03/2019 50 279.39 42 12/08/2020 Work is ongoing
43 (Pack No: HFMLIP/Habi/17-18/W-186) Maintenance of Azmiriganj-Kakailsew Road at Ch. 1000m-6500m under Azmiriganj Upazila, Dist. Habiganj. (Road ID: 636022002) HFMLIP azmiriganj 636022002 5.50 99 205.28 M/S Mostofa Kamal 175.27 10/12/2017 17/12/2017 16/12/2018 100 173.60 99 12/08/2020 final bill paid
44 HFMLIP/Habi/16-17/W-119 Improvement of Kakailsow GCCR-Rasulpur Road from Ch 00-2720m by RCC under District:Habiganj (Road ID: 636025023) HFMLIP azmiriganj 636025023 2.72 4.95 73 212.75 M/S Hasan Enterprise 174.77 15/02/2017 15/02/2017 21/02/2018 90 127.71 73 12/08/2020 Work is ongoing
45 HFMLIP/Habi/17-18/W-176 Improvement of Anandapur Ghat-Anandapur Village Road at Ch. 00-2600 by RCC under Dist. Habiganj.(Road ID: 636025034), Submergible HFMLIP azmiriganj 636025034 1.67 2.25 57 168.05 Md Golam Faruk 142.00 01/01/2018 07/01/2018 31/12/2019 70 80.42 57 12/08/2020 Work is ongoing
46 HFMLIP/ Habi/17-18/W-198 Improvement of Azmiriganj-Paharpur Road at ch. 2000-6400m by slope protection work with CC block under Dist. Habiganj. (Road ID: 636112008) HFMLIP azmiriganj 636112008 100 103.01 M/S Mostofa kamal, Niaz Park,B'baria 86.50 11/02/2018 18/02/2018 17/02/2019 100 86.21 100 12/08/2020 Final bill paid
47 HFMLIP/Habi/15-16/W-50 Improvement of Azmiriganj-Paharpur Road at Ch 2000-4200 m by RCC HFMLIP azmiriganj 636022003 2.20 10.90 100 341.47 M/S Hasan Enterprise 321.28 23/03/2016 29/03/2016 29/03/2017 100 319.91 100 09/08/2020 Final Bill paid
48 HFMLIP/Habi/15-16/W-51 Improvement of Azmiriganj-Paharpur Road at Ch 4200-6400 m by RCC HFMLIP azmiriganj 636022003 2.20 9.30 100 324.55 M/S Hasan Enterprise 264.64 23/03/2016 29/03/2016 15/03/2018 100 264.60 100 09/08/2020 Final Bill paid
49 HFMLIP/Habi/15-16/W-52 Improvement of Azmiriganj-Paharpur Road at Ch 6400-8600 m by RCC HFMLIP azmiriganj 636022003 2.20 5.70 100 237.73 HE-UM(JV) 215.73 23/03/2016 29/03/2016 29/03/2017 100 215.65 100 09/08/2020 Final Bill paid
50 HFMLIP/Habi/15-16/W-62 Improvement of Solori-Shibpasa Road at Ch 3000-6000 m by RCC , HFMLIP azmiriganj 636025035 3.00 4.80 100 197.15 Challenger & M.Hasan (JV) 176.52 31/05/2016 07/06/2016 06/06/2017 100 176.50 100 09/08/2020 Final Bill paid
51 HFMLIP/Habi/15-16/W-63 Improvement of Kamalpur Ghat to Kamalpur primary school Road at Ch 00-2750 m by RCC HFMLIP azmiriganj 636025026 2.75 7.80 94 214.17 Challenger & M.Hasan (JV) 194.89 12/04/2016 19/04/2016 31/03/2018 100 183.83 94 09/08/2020 FB U/P
52 HFMLIP/Habi/16-17/W-120 Improvement of Pirojpur-Launch Ghat-Jalshuka Bazar Road at Ch 00-2000m by RCC HFMLIP azmiriganj 636024002 2.00 6.00 100 159.91 LCS 159.91 13/02/2017 13/02/2017 12/10/2017 100 159.64 100 09/08/2020 FinaL Bill Paid
53 HFMLIP/Habi/16-17/W-127 Improvement of Bong Road-Paddy Land Road from Ch 00-2000m HFMLIP azmiriganj 636025006 2.00 1.80 100 144.15 Challenger & M.Hasan (JV) 124.50 04/04/2017 11/04/2017 05/02/2018 100 124.48 100 09/08/2020 FinaL Bill Paid
54 HFMLIP/Habi/16-17/W-139 Improvement of Solori-Shibpasa Road at Ch 5868-7148 m by RCC HFMLIP azmiriganj 636025035 1.28 42 109.66 SE-MA JVC 86.04 18/05/2017 25/05/2017 30/06/2019 100 36.44 42 09/08/2020 FB U/P
55 HFMLIP/Habi/16-17/W-114 Maintenane of Baniachong GC -Kumri Durgapur GC via Jonab Ali College and Bithangol GC from Ch 00-2000 m HFMLIP azmiriganj 636112002 2.00 100 118.82 Md. Taz Uddin 100.75 19/12/2016 04/12/2016 01/05/2017 100 100.37 100 09/08/2020 Final bill paid
56 HFMLIP/Habi/16-17/W-118 Improvement of Guharua Pry. School -Panchparia Road via Sluice gate Durgapur at Ch 00-5000 m by BC HFMLIP bahubal 636054079 5.00 3.90 100 266.99 M/s. Maitry Builders & RS Construction -JV 238.82 22/02/2017 22/02/2017 21/02/2018 100 96.06 100 23/05/2024
57 HFMLIP/Habi/16-17/W-131 Improvement of Shuaiya Bazar-Ruyail Road by RCC at Ch 1000-2000 m by RCC under Upazila: Bahubal, District:Habiganj (Road ID: 636055058) HFMLIP bahubal 636055058 1.00 6.85 100 101.11 M/s Vigilant Construction 86.00 10/04/2017 17/04/2017 30/06/2020 100 85.92 100 23/05/2024
58 HFMLIP/Habi/14-15/EW-14 Re-excavation of Nidhonpur-Kalisiri Khal at Ch. 00-3600m Upazila: Bahubal HFMLIP bahubal 3.60 100 3302342.00 LCS 3302342.00 21/05/2015 30/06/2015 100 29.65 100 23/05/2024
59 HFMLIP/Kishore/15-16/W-35 Improvement of Ujanchar Bazar-Halimpur UP Road by BC at Ch 4226-6516m District: Kihoregonj (Road ID: 348063001) HFMLIP bahubal 348063001 2.29 8.70 99 160.12 M/S Momo Construction 151.81 28/01/2016 03/02/2016 27/01/2017 100 149.90 99 18/08/2020 Final bill paid
60 HFMLIP/Habi/15-16/W-39 Improvement of Satkapon UP Office (Chalitatala) Bakterpur via Shoaia Bazar Road at Ch 8920-10320 m , , District: Hobiganj ( Road ID: 636053004), Submergible HFMLIP bahubal 636053004 1.40 98 138.58 MS RS Construction 109.57 13/03/2016 20/03/2016 05/07/2018 100 107.19 98 13/08/2020 Final Bill paid
61 HFMLIP/Habi/16-17/W-118 Improvement of Guharua Pry. School -Panchparia Road via Sluice gate Durgapur at Ch 00-5000 m by BC ,District: Hobiganj (Road ID: 636054079) HFMLIP bahubal 636054079 5.00 3.90 40 266.99 M/s. Maitry Builders & RS Construction -JV 238.82 22/02/2017 22/02/2017 21/02/2018 70 96.06 40 13/08/2020 Conflict with BWDB
62 HFMLIP/Habi/16-17/W-131 Improvement of Shuaiya Bazar-Ruyail Road by RCC at Ch 1000-2000 m by RCC under District:Habiganj (Road ID: 636055058) , Submergible HFMLIP bahubal 636055058 1.00 6.85 70 101.11 M/s Vigilant Construction 86.00 10/04/2017 17/04/2017 11/02/2018 90 60.53 70 13/08/2020 Work is ongoing
63 HFMLIP/Habi/14-15/W-16 Improvement of Khagaura-Bagdair road at Ch. 00-2000m & construction of 8 Nos. RCC structure at 1480m (Road ID: 636025035), Submergible HFMLIP bahubal 636025035 1.99 13.35 93 114.00 LCS 114.00 26/05/2015 26/05/2015 25/06/2016 100 106.20 93 13/08/2020 Final bill paid
64 HFMLIP/Habi/15-16/W-89 Construction of 4.00mx4.00m size RCC Box Culvert at Ch: 300m and 2.50mx2.50m size RCC Box Culvert at Ch: 1988m of Khagura-Bagdair Road, Dist: Habiganj. HFMLIP bahubal 0.05 3.60 100 31.86 Md Abdul Quayum 28.45 21/08/2016 21/09/2016 20/03/2017 100 27.51 100 13/08/2020 Final Bill paid
65 HFMLIP/Habi/17-18/W-175 Improvement of Satkapon UP Office (Chalitatala)-Bakterpur Via Shoaia Bazar Road at Ch. 10320-12580m by RCC under Dist. Habiganj. (Road ID: 636053004), Submergible HFMLIP bahubal 636053004 2.26 31.50 32 436.94 M/S Hasan Enterprise, T.A Road, B'Baria 410.82 21/11/2017 28/11/2017 27/11/2018 40 130.18 32 13/08/2020 Work is ongoing
66 HFMLIP/Habi/15-16/W-39 Improvement of Satkapon UP Office (Chalitatala) Bakterpur via Shoaia Bazar Road at Ch 8920-10320 m HFMLIP bahubal 636053004 1.40 98 138.58 MS RS Construction 109.57 13/03/2016 21/03/2016 05/07/2018 100 107.19 98 10/08/2020 Final Bill paid
67 HFMLIP/Habi/15-16/W-89 Construction of 4.00mx4.00m size RCC Box Culvert at Ch: 300m and 2.50mx2.50m size RCC Box Culvert at Ch: 1988m of Khagura-Bagdair Road HFMLIP bahubal 0.05 3.60 100 31.86 Md Abdul Quayum 28.45 21/08/2016 21/09/2016 20/03/2017 100 27.51 100 10/08/2020 Final Bill paid
68 HFMLIP/Habi/14-15/W-16 Improvement of Khagaura-Bagdair road at Ch. 00-2000m & construction of 8 Nos. RCC structure at 1480m HFMLIP bahubal 636025035 1.99 93 114.00 LCS 114.00 26/05/2015 26/05/2015 25/06/2016 100 106.20 93 09/08/2020 Final bill paid
69 HFMLIP/Habi/14-15/W-13 Re-excavation of Dhorial Khal at Ch. 00-900m Upazila: Bahubal HFMLIP bahubal 0.90 898682.00 LCS 0.00 0  
70 HFMLIP/Habi/15-16/EW-54 Re-excavation of Mara Khal from Choto Boroiuri to Ponarabda at Ch 00-2000m Upazila: Bahubal, District: Habigang HFMLIP bahubal 2.00 1111870.00 LCS 1111870.00 0 work delayed due to flood
71 HFMLIP/Habi/15-16/EW-55 Re-excavation of Jainal Khal from Chok Habijpur to Goharoa at Ch 00-4000m Upazila: Bahubal, District: Habigang HFMLIP bahubal 4.00 3411774.00 LCS 3411774.00 0 work delayed due to flood
72 HFMLIP/Habi/15-16/EW-56 Re-excavation of Ratna Khal from Pukra to Chapbill at Ch 00-2500m Upazila: Baniachong, District: Habigang HFMLIP baniachong 2.50 100 2654885.00 LCS 2654885.00 17/02/2016 30/06/2016 100 23.20 100 23/05/2024
73 HFMLIP/Habi/15-16/EW-57 Re-excavation of Battuna Khal from Burajura to Sutki River at Ch 00-800m Upazila: Baniachong, District: Habigang HFMLIP baniachong 0.80 100 1232539.00 LCS 1232539.00 100 10.16 100 23/05/2024
74 HFMLIP/Habi/15-16/EW-58 Re-excavation of Phataria Khal in Mokar Haor at Ch 00-635m Upazila: Baniachong, District: Habigang HFMLIP baniachong 0.64 100 1057746.00 LCS 1057746.00 17/02/2016 30/06/2016 100 7.27 100 23/05/2024
75 HFMLIP/Habi/15-16/EW-59 Re-excavation of Majhergul Khal at Ch 00-600m Upazila: Baniachong, District: Habigang HFMLIP baniachong 0.60 100 863872.00 LCS 863872.00 17/02/2016 30/06/2016 100 8.08 100 23/05/2024
76 HFMLIP/Habi/16-17/EW-124 Re-excavation of Sudam Khali Khal at Ch 00-1500m Upazila: Baniachong, District: Habigang HFMLIP baniachong 1.50 100 2554432.00 LCS 2554432.00 23/03/2016 15/12/2017 100 22.50 100 23/05/2024
77 HFMLIP/Habi/16-17/EW-134 Re-excavation of Kacha Singra Beel at Upazila Baniachongj, Dist. Habigang. HFMLIP baniachong 100 1050531.00 LCS 1050531.00 100 10.34 100 23/05/2024
78 HFMLIP/Habi/16-17/EW-135 Re-excavation of Kutiara Beel at Upazila Baniachongj, Dist. Habigang. HFMLIP baniachong 100 1405377.00 LCS 1405377.00 100 13.82 100 23/05/2024
79 HFMLIP/Habi/16-17/EW-136 Re-excavation of Choto Beri Beel at Upazila -Baniachong, Dist. Habigang. HFMLIP baniachong 100 1227954.00 LCS 1227954.00 100 12.17 100 23/05/2024
80 HFMLIP/Habi/17-18/W-184 Improvement of Subidpur UP Office-Awal Mohal Bazar via Kabirpur Niamatpur Road at Ch. 3000-4749m by RCC under, Dist. Habiganj. (Road ID: 636113013), Submergible HFMLIP baniachong 636113013 1.75 5.00 43 758.86 M/S Challenger & M. Hasan JV 688.47 20/11/2017 27/11/2017 07/02/2020 50 296.01 43 18/08/2020 Work is ongoing
81 HFMLIP/Habi/17-18/W-177) Improvement of Pukra UP Office-Kandipura Village Road Via Darowa, Sathgram High School at Ch. 00-2150m by BC under Dist. Habiganj.(Road ID: 636114049), Submergible HFMLIP baniachong 636114049 2.15 5.50 100 153.76 MRS-AKC (JV), Habiganj 144.17 03/12/2017 10/12/2017 09/12/2018 100 143.52 100 18/08/2020 Final bill paid
82 HFMLIP/Habi/16-17/W-128 Improvement of Subidpur UP Office Aowal Mohal Bazar via Kabirpur Niamatpur Road at Ch 4704-6704 m by RCC under District:Habiganj (Road ID: 636113013), Submergible HFMLIP baniachong 636113013 2.00 4.40 96 182.05 MAM CONSTRUCTION LTD. 158.81 04/04/2017 11/04/2017 05/02/2018 100 152.87 96 13/08/2020 FinaL Bill Paid
83 (Pack No: HFMLIP/Habi/17-18/W-187 Maintenance of Pukra Bazar-Pukra UP Office Road at Ch. 00m-3139 m under Baniachong Upazila, Dist. Habiganj. (Road ID: 636113005) ) HFMLIP baniachong 636113005 3.14 100 145.88 M/S Jamal Enterprise 124.73 05/12/2017 12/12/2017 11/12/2018 100 124.27 100 13/08/2020 final bill paid
84 (Pack No: HFMLIP/Habi/17-18/W-189) Maintenance of Baniachong GC-Paharpur GC Via Adarsha Bazar Ariamugur Road at Ch. 00m-1260 m under Baniachong Upazila, Dist. Habiganj. (Road ID: 636112008) HFMLIP baniachong 636112008 1.26 99 186.15 HE-UM (JV) 157.17 14/12/2017 21/12/2017 20/12/2018 100 155.68 99 13/08/2020 final bill paid
85 (Pack No: HFMLIP/Habi/17-18/W-191) Maintenance of Ilias Academy- Sharifuddin Road at Ch. 1100m-1411m under Baniachong Upazila, Dist. Habiganj. (Road ID No. 636114015) HFMLIP baniachong 636114015 0.31 87 37.73 Md Ahsan Uddin Chowdhury 30.65 14/12/2017 21/12/2017 19/06/2018 100 26.76 87 13/08/2020 FB u/p
86 HFMLIP/Habi/15-16/W-40 Improvement of Hobiganj Baniachong RHD via Sonaro Village Road by RCC at Ch 1000-1850 m , District: Hobiganj (Road ID: 636114013), Submergible HFMLIP baniachong 636114013 0.85 94 52.26 LCS 52.26 10/02/2016 07/03/2016 30/04/2017 100 49.09 94 13/08/2020 Final Bill paid
87 HFMLIP/Habi/15-16/W-53 Improvement of Kadirganu GC-Paharpur GC via Karcha Road at Ch 1300-5920 m by BC , District: Hobiganj (Road ID: 636112007), Non-Submergible HFMLIP baniachong 636112007 4.62 7.00 100 366.65 Md Mizanur Rahman Shamim 348.32 10/03/2016 17/03/2016 28/05/2017 100 337.17 100 13/08/2020 Final Bill paid
88 HFMLIP/Habi/16-17/W-132 Improvement of Shibgonj Bazar to Halderpur Chilori Road by RCC at Ch 00-3000 m by RCC under District:Habiganj (Road ID: 636114019), Submergible HFMLIP baniachong 636114019 3.00 1.35 100 228.30 Md. Mizanur Rahman Shamim 187.20 04/04/2017 11/04/2017 16/01/2018 100 187.10 100 13/08/2020 FinaL Bill Paid
89 HFMLIP/Habi/15-16/W-41 Improvement of Subidpur UP Office Aowar Mohal Bazar via Kabirpur, Niamatpur Road at Ch 2000-3000 m by BC ,District: Hobiganj (Road ID: 636113013), Non-Submergible HFMLIP baniachong 636113013 1.00 1.35 100 76.32 M/S Mason Ent 64.11 04/04/2017 20/03/2016 16/01/2018 100 187.10 100 13/08/2020 FinaL Bill Paid
90 HFMLIP/Habi/15-16/W-40 Improvement of Hobiganj Baniachong RHD via Sonaro Village Road by RCC at Ch 1000-1850 m HFMLIP baniachong 636114013 0.85 94 52.26 LCS 52.26 10/02/2016 07/06/2016 30/04/2017 100 49.09 94 10/08/2020 Final Bill paid
91 HFMLIP/Habi/15-16/W-41 Improvement of Subidpur UP Office Aowar Mohal Bazar via Kabirpur, Niamatpur Road at Ch 2000-3000 m by BC HFMLIP baniachong 636113013 1.00 3.00 100 76.32 M/S Mason Ent 64.11 20/03/2016 27/03/2016 31/10/2018 100 64.06 100 10/08/2020 final Bill paid
92 HFMLIP/Habi/15-16/W-53 Improvement of Kadirganu GC-Paharpur GC via Karcha Road at Ch 1300-5920 m by BC HFMLIP baniachong 636112007 4.62 7.00 100 366.65 Md Mizanur Rahman Shamim 348.32 10/03/2016 17/03/2016 28/05/2017 100 337.17 100 10/08/2020 Final Bill paid
93 HFMLIP/Habi/16-17/W-128 Improvement of Subidpur UP Office Aowal Mohal Bazar via Kabirpur Niamatpur Road at Ch 4704-6704 m by RCC HFMLIP baniachong 636113013 2.00 4.40 96 182.05 MAM CONSTRUCTION LTD. 158.81 04/04/2017 11/04/2017 28/02/2018 100 152.87 96 10/08/2020 FinaL Bill Paid
94 HFMLIP/Habi/16-17/W-132 Improvement of Shibgonj Bazar to Halderpur Chilori Road by RCC at Ch 00-3000 m by RCC HFMLIP baniachong 636114019 3.00 1.35 100 228.30 Md. Mizanur Rahman Shamim 187.20 04/04/2017 11/04/2017 16/01/2018 100 187.10 100 10/08/2020 FinaL Bill Paid
95 HFMLIP/Habi/15-16/W-36 Improvement of Poli-Pachparia Road by BC at Ch 1500-5700 m HFMLIP habiganj-s 636444035 4.20 12.80 91 293.25 FS JV 256.59 29/05/2016 05/07/2016 30/06/2018 100 232.26 91 31/01/2021 Final Bill paid
96 (Road ID: 636444047) (Pack No: HFMLIP/Habi/17-18/W-185) Maintenance of Biswa Road to Ladia Road Via Morora Kazirgonj Road at Ch. 00m-975m under Sadar Upazila, Dist. Habiganj. HFMLIP habiganj-s 636444047 0.98 100 40.26 M/S Mukhis Traders 32.11 30/11/2017 07/12/2017 29/03/2018 100 31.67 100 18/08/2020 final bill paid
97 (Pack No: HFMLIP/Habi/17-18/W-188) Maintenance of Lakhai R&H-Rajiura UP-Uchail Bazar Road at Ch. 00m-3636 m under Sadar Upazila, Dist. Habiganj. (Road ID: 636443011) HFMLIP habiganj-s 636443011 1.57 99 87.78 Md Golam Faruk 69.79 03/12/2017 03/12/2017 09/12/2018 100 69.15 99 18/08/2020 final bill paid
98 HFMLIP/Habi/15-16/W-36 Improvement of Poli-Pachparia Road by BC at Ch 1500-5700 m , District: Hobiganj (Road ID: 636444035), Non-Submergible HFMLIP habiganj-s 636444035 4.20 12.80 91 293.25 FS JV 256.59 29/05/2016 05/07/2016 30/06/2018 100 232.26 91 18/08/2020 Final Bill paid
99 HFMLIP/Habi/16-17/W-101 Improvemen Poil Natun Bazar Hat t HFMLIP habiganj-s 96 79.79 M/S Mason Enterprise 66.86 06/11/2016 12/11/2016 11/05/2017 100 63.95 96 09/08/2020 Final bill paid
100 HILIP/HAB/UZR-003 Azmirigonj Paharpur Road by RCC Pavement at Ch. 00.00m-1000.00m under Azmirigonj Upazila. HILIP azmiriganj 1.00 103.39 Md. Moksod Ahmed 88.06 100  
101 HILIP/13/WD4/HAB-4 Improvement of Baniachong GC - Paharpur GC via Adarsha Bazar Road at Ch. 1250m-2250m under Baniachong Upazila HILIP baniachong 1.00 84.09 MA-Ak(J.V) Shaistanagar, Habiganj 84.09 02/03/2015 100  
102 HILIP/14/WD4/UZR-HAB/Ban-04 Improvement of Baniachang GC - Phaharpur GC Road Via Adarsha BazarAriamugor at ,(Ch.2250 m-4250 m )under Baniachang Upazila ,Habiganj . HILIP baniachong 2.00 165.98 M/S Hasan Enterprise 165.98 06/10/2016 100  
103 HILIP/15/WD4/UZR-HAB/Ban-06 Improvement of Baniachang GC – Pharpur GC road via Adarsha Bazar Ariamugur at ch. 4250-6250m. with 1 no 2x4.00mx4.00mm Box Culvert at ch. 4315m and 3 nos Box Culvert 0.75mx0.75m at ch.5100m,5650m,6000m under Baniachang Upazila, Dist.- Habiganj. ID NO-636112008 HILIP baniachong 2.00 195.72 M/S Maitry Builders, B. Baria 195.72 28/03/2017 100  
104 HILIP/15/WD2/UZR-Hab/Ban-10 Improvement of Habigonj Nabigonj R&H at Imambari – Baniachang via Gunnee, Barauria road under ch: 6035-803.00m under Baniachang Upazila, Dist.- Habiganj. HILIP baniachong 2.00 174.15 Md. Mizanur Rahman Shamim, Nasratpur, Habiganj 174.15 27/07/2017 100  
105 HILIP/15/WD2/UZR-Hab/Ban-12 (A)   Improvement of Baniachang GC- Paharpur GC road via Adarsha Bazaar Ariamugor at ch: 6250m-8630.00m & under Baniachang Upazila, Dist.- Habiganj. (B) Const. of 3 nos. RCC box-culvert size 0.75mx0.75 at ch 6350m, 6800m & 8250m no the same alignmant. HILIP baniachong 2.38 224.28 M/S Maitry Builders, Brahmanbaria 218.94 100  
106 HILIP/HAB/UNR-001 (i) Improvement of Bithangal GC-Monduri UP Office Road via Bijoypur at Ch. 1080.00m - 2040.00m (ii) Construction of 6 Nos Drain Culvert 1 x 1.00m x 1.00m on the Same at Ch. 1294m, 1414m, 1744m, 2064m, 2444m & 2714.00m (iii) Construction of Protection work at Ch. 1220m at culvert approach on the Same Road. HILIP baniachong 0.96 94.80 Md. Kohinoor Alam, Bogla Bazar, Habiganj. 85.12 28/05/2014 100  
107 HILIP/13/WD5/HAB-9 Improvement of Bithangal GC-Monduri UP Office Road via Bijoypur at Ch. 2040m-3080m under Baniachong Upazila. HILIP baniachong 1.04 90.36 M/S. Rabbi Traders, Shahrashti, Chandpur. 75.05 31/03/2016 100  
108 HILIP/14/WD5/UNR-HAB/Ban-03 Improvement of Bithangal GC-Monduri UP Office Road via Bijoypur at (Ch. 3080 m - 5080 m), & 5 Nos Box Culvert Size-1X1.50mX1.5m.Ch2980m, 3420m,3640m,3705m,4150m on same road under Baniachong Upazila.Habiganj, HILIP baniachong 2.00 181.33 M/S Hasan Enterprise.T.A. Road Brahmanbaria. 159.39 06/10/2016 100  
109 HILIP/14/WD5/UNR-HAB/Ban-20 Improvement of Kagapasha UP Office - Chamakpur Bazar at (Ch. 4440 m - 6440 m), With 4 Nos U-Drains at Ch .5170 m ,5440 m,5865m, &6410m under under Baniachong Upazila.Habiganj, HILIP baniachong 2.00 160.91 M/S Hasan Enterprise, B.Baria 159.39 26/04/2016 87  
110 HILIP/15/WD5/UNR-HAB/Ban-10 Improvement of Bithangal GC – Monduri UP Office Road at ch. 5080 – 6086m under Baniachang Upazila, Dist.- Hobigonj. HILIP baniachong 1.01 74.34 M/S Hasan Enterprise, TA road, B. Baria. 69.44 14/02/2017 0  
111 HILIP/15/WD5/UNR-HAB/Ban-14 Improvement of Kagapasha UP Office – Chamakpur Bazar road at ch. 1440-4440m. with 2 nos Box Culvert size (4.00mx4.00m) at ch. 3670m, 4290m and 3 nos Box Culvert size (0.75mx0.75m) at ch. 1800m, 2650m, 3200m under Baniachang Upazila, Dist.- Habiganj. HILIP baniachong 3.00 295.39 Challenger M. Hasan. B. Jaman Road, Habiganj 271.59 29/04/2017 0  
112 HILIP/15/WD3/UNR-HAB/Ban-19 Part-A) Improvement of Kagapasha UP office -Chamakpur bazaar at ch 00m- 1440m under Baniachang Upazila, Dist.- Habiganj. ID: 636113010 Part-B)Const. of 2 nos. RCC box culvert at ch. 350m & 1300m on the same alignment. HILIP baniachong 1.44 118.89 M/S Zillur Enterprise, 3/10 Gulisthan Shopping Complex, Dhaka-1000 128.66 30/06/2016 100  
113 HILIP/13/WD15/HAB-3 Construction of Community CC Block work on Karcha - Araimugur Road at Ch 0+00m - 2+000m HILIP baniachong 2.00 106.71 LCS 106.71 18/03/2014 100  
114 HILIP/14/WD15/VR-HAB/Ban-26 Improvement of Community Road by Habiganj-Sujatpur Road to Mokrompur Road at( Ch 0.00 m - 2000 m),with 65 m Protection Work HILIP baniachong 2.00 121.64 LCS 121.64 17/01/2016 100  
115 HILIP/14/WD15/VR-HAB/Ban-53 Improvement of Korcha Ariamugur road at CH-1980m - 4480m under Baniachanj Upazila , Dist- Hobiganj HILIP baniachong 2.50 141.10 LCS 141.10 07/03/2016 100  
116 HILIP/14/WD15/VR-HAB/Ban-55 Improvement of Community RCC Road Ekram Bazar-Balla Madhupur Road at Ch. 0.00-1600.00m under Baniachanj Upazila , Dist- Hobiganj HILIP baniachong 1.60 88.28 LCS 88.28 15/04/2016 80  
117 HILIP/14/WD15/VR-HAB/Ban-56 Improvement of Community RCC Road Ekram Bazar--Balla Madhupur Road at Ch. 1600-3000m .under Baniachanj Upazila , Dist- Hobiganj HILIP baniachong 1.40 75.61 LCS 75.61 15/04/2016 80  
118 HILIP/14/WD15/VR-HAB/Ban-78 Improvement of Korcha Ariamugur road at CH-4480m - 5080 m with 01 nos. U-Drain in size 0.75m x 0.75 m at Ch. 3930 m under Baniachanj Upazila , Dist- Hobiganj HILIP baniachong 0.60 36.38 LCS 36.38 25/06/2016 80  
119 HILIP/15/WD4/VR-HAB/Ban-25 Part-A) Improvement of Ekrampur Bazar – Balla Madhupur Road at (Ch.3000 - 4500m) under Baniachang Upazila, Dist.-Habiganj. HILIP baniachong 1.50 94.32 LCS 94.32 100  
120   Part-B) Improvement of Ekrampur Bazar – Balla Madhupur Road at (Ch.4500 - 6000m) under Baniachang Upazila, Dist.-Habiganj. HILIP baniachong 1.50 94.05 LCS 94.05 100  
121 HILIP/15/WD4/VR-HAB/Ban-38 Improvement of Ekrampur Bazar – Balla Madhupur Road at (Ch.6000 - 8000m) with 4 nos U-Drain size 0.75m×0.75 at ch. 6300m, 6800m, 7250m & 7800m under Baniachang Upazila, Dist.-Habiganj. HILIP baniachong 2.00 133.87 LCS 133.87 100  
122 HILIP/15/WD4/VR-HAB/Ban-39 Improvement of Ekrampur Bazar – Balla Madhupur Road at (Ch.8000 - 10000m) with 4 nos U-Drain size 0.75m×0.75 at ch. 8250m, 8800m, 9250m & 9750m under Baniachang Upazila, Dist.-Habiganj HILIP baniachong 2.00 133.82 LCS 133.82 100  
123 HILIP/16/WD3/UNR-HAB/Azm-02 Part-A Improvement of Shibpasha UP – Pasimbag Bazar via Mokleszen Road at ch. 2660 – 5560m under Azmiriganj Upazila, Dist.- Hobigonj. Part-B) Const. of 1 no RCC Box Culvert size (4.00mx4.00m) at ch.5550m on the same alignment. Part-C) Const. of 3 nos RCC Box Culvert size (2.50mx2.50m) at ch. 2670m, 2870m & 3250m on the same alignment. Part-D) Const. of 2 nos RCC Box Culvert size (1.50mx1.50m) at ch. 2970m & 5010m on the same alignment. HILIP habiganj-s 2.90 230.15 MAMCL-MAKC JV 223.17 07/04/2018 100  
124 HILIP/15/WD3/UNR-HAB/Azm-21 Improvement of Shibpasha UP – Pasimbag Bazar via Mokleszen Road at ch. 2000 – 2660m under Azmiriganj Upazila, Dist.- Hobigonj. HILIP lakhai 0.66 57.40 Md. Mizanur Rahman 48.50 27/07/2017 100  
125 HILIP/HAB/UZR-001 (i) Improvement of Lokra-Madna Bazar Road at Ch. 4615.00m - 6565.00m (ii) Construction of 5 Nos 0.625m Span U-Drain on the Same Road at Ch. 3048m, 5345m, 5755m, 6265m & 6515m (iii) Construction of Top Slab for 1.85m Span Culvert on the Same Road at Ch. 4825m HILIP lakhai 1.96 197.36 Md. Golam Faruk, Shaistanagar, Habiganj. 193.67 14/12/2014 100  
126 HILIP/HAB/UZR-002 Improvement of Lokra-Madna Bazar Road (03-Nos Bridge Approach) by Earth Filling, RCC Pavement & Slope Protection work at Ch. 1190m-1225m, 1454m-1519m, 2941m-3048m, 3275m-3414m, 3494m-3525m & 3565.50m – 3600.50m (Effective Length 481.00m) under Lakhai Upazila. HILIP lakhai 0.89 85.55 M/S. Longon Enterprise, Nashir Nagar, B-Baria. 75.27 09/12/2014 100  
127 HILIP/14/WD4/UZR-HAB/Lak-12 Improvement of Lokra - Madna Bazar Road at (Ch. 6865-7865m). With 3nos U-Drain at ch. 7035m,7257m,7280m, & 1 nos Box Culvert at ch.7322m Under Lakhai Upzila, Dist.-Habiganj. HILIP lakhai 1.00 107.07 Md. Taz Uddin Anwarpur , Habiganj 94.30 27/04/2016 100  
128 HILIP/16/WD2/UZR-HAB/Lak-02 Part-A) Improvement of Lokra – Madna Bazar Road at ch. 7865.00 - 12200.00m). under Lakhai Upazila, Dist.-Habiganj HILIP lakhai 4.34 407.99 M/S Hasan Enterprise, B.Baria 342.71 100  
129 HILIP/HAB/UNR-002 Improvement of Murakori UP Office – Lakhai UP Office via Krisnapur Bazar Road at Ch. 0.00m – 264.00m & 400.00m – 2140.00m under Lakhai Upazila. HILIP lakhai 1.96 182.58 Md. Taj Uddin, Anowarpur, Habiganj. 161.10 28/11/2014 100  
130 HILIP/14/WD5/UNR-HAB/Lak-13 Improvement of Murakuri UP Office - Lakhai UP Office Via Krishnopur Bazar Road at (Ch. 2200 m - 3200 m), & 2 Nos U-Drains at Ch .426 m ,471 m. under Lakhai Upazila.Habiganj, HILIP lakhai 1.00 90.97 M/S Longon Enterprise, Nasir Nagar, B.Baria 79.99 01/03/2016 100  
131 HILIP/14/WD5/UNR-HAB/Lak-25 Improvement of Murakuri UP Office - Lakhai UP Office Via Krishnopur Bazar Road at (Ch. 3200 m - 4700 m), with 2 Nos RCC Culvert & 03 nos. U-Drain at Ch-4100m, 4500m 4170m, 4560m and 4695m under Lakhai Upazila.Habiganj, HILIP lakhai 1.50 133.28 M/S Hasan Enterprise, B.Baria 119.86 20/09/2016 90  
132 HILIP/15/WD5/UNR-HAB/Lak-11 Improvement of Murakari UP Office – Lakhaii UP Office via Krishnapur Bazar Road at ch. 4700 – 5200m at ch. under Lakhai Upazila, Dist.- Hobigonj. HILIP lakhai 0.50 40.75 Md. Golam Faruk, Shaistanagor, Habiganj. 32.20 22/01/2017 100  
133 HILIP/13/WD15/HAB-1 Construction of Community CC Block work on Bulla Dc Road – East Bulla Road at Ch 0+00m - 1+000m HILIP lakhai 1.00 61.71 LCS 61.71 15/04/2015 100  
134 HILIP/13/WD15/HAB-2 Construction of Community CC Block work on Lakhai H/Q – Lakhai Bazar via Lakhai UP Office Road at Ch 0+00m - 1+080m HILIP lakhai 1.08 66.69 LCS 66.69 30/04/2015 100  
135 HILIP/14/WD15/VR-HAB-01 Improvement of DC road Hazi Bari -Sutang River from (Ch-0.00m- 1830 m) HILIP lakhai 1.83 112.01 LCS 112.01 20/01/2016 92  
136 HILIP/14/WD15/VR-HAB/Lak-41 Improvement of Bulla DC Road to East Bulla Road at( Ch 1000 m - 1200 m) under Lakhai Upazila , Dist- Hobiganj HILIP lakhai 0.20 11.90 LCS 11.90 10/12/2016 100  
137 HILIP/15/WD5/UNR-HAB/Azm-12 Improvement of Shibpasha UP – Pasimbag Bazarv via Mokleszen Road at ch. 1000 – 2000m with 2 nos U-Drain size (0.625mx0.600m) at ch. 1480m & 1746m) under Azmiriganj Upazila, Dist.- Hobigonj. HILIP madhabpur 1.00 97.04 M/S Hasan Enterprise 84.40 12/02/2017 100  
138 HILIP/14/WD5/UNR-HAB/Azm-12 Improvement of Shibpasha UP Office - Paschimbag Bazar Via Mokleszam Road at (Ch.0.00 m - 1000 m), under Ajmeriganj Upazila District: Habiganj. HILIP nabiganj 1.00 85.12 M/S S. Alam Enterprise, 77.75 24/02/2016 100  
139 IRIDP-2/HOB/DW-1 Improvement of Mirpur-Tungeshawer-Satiajuri Road at (Ch:- 0.00-600.00 m) IRIDP-2 bahubal 0.60 33.22 M/S. Chowdhary Enterprise 28.15 18/02/2016 02/03/2017 100  
140 IRIDP-2/HOB/DW-2 Improvement of Nandanpur Bazar to Lamagoan via Nandanpur Pri. School to Jangalia Road at (Ch:- 0.00-500.00 m) IRIDP-2 bahubal 0.50 23.20 M/S. Chowdhary Enterprise 19.66 18/02/2016 08/12/2016 100  
141 IRIDP-2/HOB/DW-3 Improvement of Bahubal–Rampur Road via Noagaon Joynabad Mowri Road at (Ch:- 0.00-900.00 m) IRIDP-2 bahubal 0.90 36.75 M/S. Chowdhary Enterprise 31.15 18/02/2016 02/03/2017 100  
142 IRIDP-2/HOB/DW-4 (a) Improvement of Bahubal–Zila Parishad–Karangi River road via House of Shofiq saheb Road at (Ch:- 0.00-400.00 m) (b) Construction of 01 no RCC Box Culvert on the Same Road at (Ch: 05m, 1x2.00x2.00m.) IRIDP-2 bahubal 0.40 22.50 M/S. Neon Enterprise 19.31 21/02/2016 30/03/2017 100  
143 IRIDP-2/HOB/DW-5 Improvement of Islampur-Goalgaon Sundartiki-West Vadeswar Kasba Karimpur Road at (Ch:- 0.00-1000.00 m) IRIDP-2 bahubal 1.00 46.40 M/S. Chowdhary Enterprise 38.40 18/02/2016 02/03/2017 100  
144 IRIDP-2/HOB/DW-6 Improvement of Vugali-Lakuri Para Road at (Ch:- 0.00-500.00 m) IRIDP-2 bahubal 0.50 44.06 M/S. Chowdhary Enterprise 37.34 18/02/2016 02/03/2017 100  
145 IRIDP-2/HOB/DW-7 (a) Improvement of Kurshi Bas Stand-MP Abdul Munim Chowdhary Babu Road via Kurshi Mukum road ( Kurshi Bas Stand-Kurshi House of Rabban Khan Road via Kurshi Mukum) at Ch:- 0.00-1200.00m (b) Construction of 3 nos Drain Culvert Same as Road at (Ch: 320m,625m IRIDP-2 nabiganj 1.20 65.69 M/S. Neon Enterprise 57.44 21/02/2016 15/05/2017 100  
146 IRIDP-2/HOB/DW-8 (a) Improvement of Sader Ghat Natun Bazar–Itakhola Islampur Road at Ch:- 0.00-925m.(b) Construction of Drain Culvert on the Same Road at (Ch: 243m, 1.00x0.600x0.600m Road Way 7.00m.) IRIDP-2 nabiganj 0.93 46.45 M/S. Neon Enterprise 40.16 21/02/2016 02/03/2017 100  
147 IRIDP-2/HOB/DW-9 (a) Improvement of Nabigonj Sherpur road–Maspara via Choitpur Road at Ch:- 691.00-1466.00m. (b) Construction of 1 No Drain Culvert on the Same Road at (Ch: 864m, 1.00x0.600x0.600m Road Way 7.00m). IRIDP-2 nabiganj 0.78 37.19 M/S. Neon Enterprise 32.53 21/02/2016 02/03/2017 100  
148 IRIDP-2/HOB/DW-10 (a) Improvement of Inathgonj Bazar – Inathganj Collage ( By pass) Road at (Ch:- 73.00- 583.00m) (b) Construction of 1 No Drain Culvert on the Same Road at (Ch: 223m 1.00x0.600x0.600m Road Way 7.00m). IRIDP-2 nabiganj -0.15 26.37 Md. Abdul Quayum 23.65 28/02/2016 15/05/2017 100  
149 IRIDP-2/HOB/DW-11 Improvement of Goplar Bazar–Gurarai Bazar Road Boithakhal GPS-South Fakir Bari House via Mukam Connecting Road at (Ch: 0.00- 500.00m). IRIDP-2 nabiganj 0.50 20.67 M/S. Nishath Enterprise 20.67 18/02/2016 15/05/2017 100  
150 IRIDP-2/HOB/DW-12 Improvement of Nabigonj Habigonj Road –Purangaon Halim Ullah house to Purangaon Dakkin Road at (Ch:- 0.00- 500.00m). IRIDP-2 nabiganj 0.50 27.07 M/S. Kuhinoor Enterprise 25.49 31/03/2016 01/04/2017 100  
151 IRIDP-2/HOB/DW-13 (a) Improvement of Sayedpur–Inathgonj Road Kamargaon– Durgapur Bazar–Nurgaon Madrasha Road at (Ch:1000.00- 2000.00m). (b) Construction of 1 No Drain Culvert on the Same Road at (Ch: 1502m, 1.00x0.600x0.600mRoadWay7.00m). IRIDP-2 nabiganj 1.00 47.60 M/S. Neon Enterprise 46.71 21/02/2016 30/11/2017 100  
152 IRIDP-2/HOB/DW-14 (a) Improvement of Nabigonj-Rudragram Road Chowdory Bazar via Nich Chowki Road at (Ch:- 0.00- 1000.00m). (b) Construction of 2 Nos Drain Culvert on the Same Road at (Ch:- 618m& 695m 1.00x0.600x0.600m RoadWay 7.00m). IRIDP-2 nabiganj 1.00 52.09 M/S. Mortuja Hasan 47.09 21/02/2016 02/03/2017 100  
153 IRIDP-2/HOB/DW-15 (a) Improvement of Jabaida Katun Atimkhana Road – Heibotpur Via Zahorpur Road at (Ch:- 0.00- 500.00m). (b) Construction of 1 No Drain Culvert on the Same Road at (Ch: 75m -1.00x0.600x0.600mRoadWay7.00m). IRIDP-2 nabiganj 0.50 24.54 Mr. Robindra kumer paul 22.58 21/02/2016 02/03/2017 100  
154