Construction of Cleaners’ Colony of Dhaka City Corporation Project (CCCP)

Components

The project will have the following components:


(a)  Construction of Flats


LGED design unit’s Architects and Engineers have developed three designs for Dhalpur, Dayagonj and Sutrapur. There are 13 new Ten Storied Buildings will be constructed. Provision for lifts has been considered in all the proposed ten storied buildings. Each flat to be constructed under the project will have 472 square foot of floor space including common space and stair. A flat will have a bed room, a common room, a kitchen, a toilet and a small verandah.


(b)Demolition of Existing Buildings


DCC had constructed 9 four storied buildings at Dholpur, Dayagonj and Sutrapur cleaners’ colony. One of the under construction buildings at Dayagonj partially collapsed after considerable progress of work. Under the circumstances BUET commented that strengthening of the already constructed buildings is not technically feasible. This has necessitated demolishing of the buildings. 


(c)Extraction of Existing Piles:


LGED has prepared fresh designs of the cleaners’ colony buildings. Considering land constraint and future need all buildings prepared ten storied. The column alignments of the proposed buildings vary with that of the existing buildings. The BUET in its report on the existing building said that existing columns are not suitable to carry load of four storied buildings. Thus it has necessitated extracting at least 50 percent of the existing piles.


(d)Relocation of Utility Services


The project will need relocation of a number of utility services for construction of the buildings.


(e)Temporary Relocation of Cleaner Families


A number of cleaners will have to be relocated temporarily to facilitate construction of the buildings and to avoid any probable accident. This will require construction of a few sheds to relocate the concerned cleaners temporarily. 

At a Glance
Short Title: CCCP
Ministry: LGRD
Executing Agency: LGED
Approval Ref: 46.093.014.01.033. 2012-708
Project Code: 05-3731-5103
Sector: Urban
Status: Ongoing Investment Project
Funded By: GOB.
Budget: 27492.42
Start Date: Jan-2013
Completion Date: Jun-2020
Name of PD: Md. Abdur Rashid Miah