Second Rural Transport Improvement Project

Serial District Name District Code/ID Upazila Name Upazila Code/ID Project ID Package No Scheme Name Road ID Length of Scheme(Km) - Road Length of Scheme(m) - Bridge/Culverts Building Quantity Estimated Amount(LAC) Contractor Name Contract Amount(LAC) Date of Contract (DD/MM/YYYY) Date of commencement (DD/MM/YYYY) Date of Completion (DD/MM/YYYY) Physical Progress(%) Financial Progress (Amount) (LAC) Financial Progress(%) Date of Progress Update (DD/MM/YYYY) Remarks
1 B.baria 14 akhaura 102 273 RTIP-II/BRA/RPM-175 Akhaura Bara Bazar (GC)-Singer Beel GC road 5.45 202.61 M/S. Zaman Construction 162.49 19/04/2015 20/11/2015 100 23/12/2018 Final
2 B.baria 14 akhaura 102 273 RTIP-II/BRA/RPM-136 b) Mogra Bazar (GC)-Satpara R&H road via Kornel Bazar, Dhaturpohela road 9.00 312.60   0.00 27/02/2014 01/02/2015 100 23/12/2018  
3 B.baria 14 ashuganj 76 273 RTIP-II/BRA/GCM-1 Improvement of Talsahar GCM 1.00 67.45 M/S. Bengal Construction 50.40 15/02/2015 14/02/2016 100 23/12/2018 Final
4 B.baria 14 ashuganj 76 273 RTIP-II/BRA/RPM-135 b) Ashugonj R&H-Khariala Road via Fire Service, Bahadurpur GC road 5.40 147.04   0.00 19/02/2014 30/04/2016 100 23/12/2018  
5 B.baria 14 b.baria-s 104 273 RTIP-II/BRA/RPM-410 Pairtala R&H-Gosaipur bazar road. (Sadar portion) 3.02 163.42 M/S. Maitry Builders 138.32 15/01/2018 29/03/2018 100 23/12/2018  
6 B.baria 14 b.baria-s 104 273 RTIP-II/BRA/RPM-277 Pairtala R&H-Gosaipur bazar road. (Sadar portion) 5.66 224.90 M/S. Hasan Enterprise. 189.06 29/08/2016 28/08/2017 100 23/12/2018  
7 B.baria 14 b.baria-s 104 273 RTIP-II/BRA/RPM-177 a) Bodal Up-Bariura bazar via Majlishpur up rd. 6.40 238.92 M/S. Mostafa Kalmal 583.22 24/05/2015 01/01/2018 100 23/12/2018  
8 B.baria 14 b.baria-s 104 273 RTIP-II/BRA/UNR-1 b) Ramrail Bazar-Sultanpur UP upto Sultanpur chawmahani Rd. 2.53 180.75 M/S. Shahil Enterprise 383.71 19/10/2014 30/11/2017 100 23/12/2018  
9 B.baria 14 b.baria-s 104 273 RTIP-II/BRA/UZR-47.1 Panchabati R&H road-Akhaura Bara bazar road. (Haliday road) 2.78 958.05 Rana Builders (Pvt.) Ltd 886.75 17/12/2015 03/12/2018 100 23/12/2018  
10 B.baria 14 bancharampur 103 273 RTIP-II/BRA/UZR-2-STR-15 Construction of 22m RCC Girder Bridge at Ch. 0+075 km on Morichakandi GC- Doshani R&H Road via Kanainagar, Charmorichakandi, Santipur, lchapur & Shibpur Road 238.00 167.19   0.00 19/12/2016 28/02/2019 82 71 09/04/2019  
11 B.baria 14 bancharampur 103 273 RTIP-II/BRA/RPM-411 Bancharampur H/Q-Morichakandi GC road via Dariadaulat UP & Kadamtali 6.79 553.87 M/S. Mostafa Kamal & M/S. Mamun Enterprise (JV) 487.41 15/01/2018 02/12/2018 100 23/12/2018  
12 B.baria 14 bancharampur 103 273 RTIP-II/BRA/RPM-278 Salimabad UP-Purba Rupashdi UP (Faradabad) Road 13.45 531.90 M/S. Hasan Enterprise. 478.19 29/08/2016 17/08/2017 100 23/12/2018 Final
13 B.baria 14 bancharampur 103 273 RTIP-II/BRA/UNR-1(A)-STR-23 Construction of 55m RCC Girder Bridge at ch. 3+004km on Salimabad UP (Asrafbad)- Rupasdi Bazar Road via Hoglakanda including approach road (Ch. 2+000-3+550km) 55.00 538.64 M/S. Mozahar Enterprise 516.95 22/06/2015 20/03/2018 100 23/12/2018  
14 B.baria 14 bancharampur 103 273 RTIP-II/BRA/RPM-136 a) Purba SaifullaKandi UP (R&H)-Imamnagar-Ananda bazar road start from R&H 5.67 193.48 Mohammed Eunus & Brothers (Pvt.) 453.45 27/02/2014 01/02/2015 100 23/12/2018 Final
15 B.baria 14 bancharampur 103 273 RTIP-II/BRA/RPM-41.2 Bancharampur GC-Jibonganj GC Road via Sonarampur Bazar 6.37 189.51 M/S Mamun Enterprise 169.70 20/02/2013 30/01/2014 100 23/12/2018 Final
16 B.baria 14 bancharampur 103 273 RTIP-II/BRA/RPM-41.1 Bancharampur GC-Jibonganj GC Road via Sonarampur Bazar 5.41 98.40 M/S Shaki Enterprise 88.57 03/03/2013 15/09/2013 100 23/12/2018 Final
17 B.baria 14 bancharampur 103 273 RTIP-II/BRA/UZR-2 Morichakandi GC - Doshani R&H Road via Kanainagar, Charmorichakandi, Santipur, Ichapur & Shibpur Road 6.10 1422.02 Rana Builders (Pvt.) Ltd. 1395.30 01/02/2016 30/04/2017 100 23/12/2018 Final
18 B.baria 14 BijoyNagar 487 273 RTIP-II/BRA/UZR-48.2 Nurpur GC-Kalibari R&H (B.Baria) Rd. 4.17 2365.05 M/S. Dolly Construction & Infratech Construction Company JV, [(Dolly Construction-Infratech (JV)] 2054.04 15/09/2016 28/02/2019 63 39 08/04/2019  
19 B.baria 14 BijoyNagar 487 273 RTIP-II/BRA/UZR-48.1 Nurpur GC-Kalibari R&H (B.Baria) Rd. 4.28 1962.30 M/S. Dolly Construction & Infratech Construction Company JV, [(Dolly Construction-Infratech (JV)] 1668.97 15/09/2016 28/02/2019 70 48 08/04/2019  
20 B.baria 14 BijoyNagar 487 273 RTIP-II/BRA/RPM-178 b) Mirzapur (Ichapur (N. UP)-Harashpur hat 6.65 209.31   0.00 27/07/2015 10/10/2016 100 23/12/2018  
21 B.baria 14 BijoyNagar 487 273 RTIP-II/BRA/UNR-3-STR-22 Construction of 32 m RCC girder bridge at ch. 9+170km on Rampur Bazar-Laxmimura bazar via char Islampur UP road including 900m approach road 32.00 436.13 JV of M/S. Hasan Enterprise & M/S. Shahil Enterprise [M/S. HE & SE (JV)] 390.69 05/03/2015 20/04/2017 100 23/12/2018 Final
22 B.baria 14 BijoyNagar 487 273 RTIP-II/BRA/RPM-137 Singerbeel-Harashpur road via paharpur UP road 17.57 343.27 M/S. Mozahar Enterprise 336.79 19/02/2014 10/12/2014 100 23/12/2018  
23 B.baria 14 BijoyNagar 487 273 RTIP-II/BRA/UNR-3 Rampur Bazar-Laxmimura bazar via Char Islampur UP 7.64 1234.03 Rana Builders (Pvt.) Ltd. 1202.77 10/11/2014 30/11/2017 100 23/12/2018  
24 B.baria 14 kasba 105 273 RTIP-II/BRA/RPM-279 Kuti-Shimrail Road 6.54 307.28 M/S. Hasan Enterprise 253.51 30/10/2016 10/01/2018 100 23/12/2018  
25 B.baria 14 kasba 105 273 RTIP-II/BRA/RPM-176 Tinlacpir R&H to Shimrail GC via Chargas Bazar & Bhallabpur Road 9.80 614.00 M/S. HE&SE (JV) 512.81 18/05/2015 26/04/2018 100 23/12/2018  
26 B.baria 14 kasba 105 273 RTIP-II/BRA/RPM-135 a) Kasba-Akhaura road 7.10 382.66 M/S. Mozahar Enterprise 544.66 19/02/2014 30/04/2016 100 23/12/2018 Final
27 B.baria 14 kasba 105 273 RTIP-II/BRA/UNR-1 c) Badair UP Office (Mandarpur Bazar)-Niamatpur Bazar via Mulogram Bazar Road 1.70 172.07   0.00 19/10/2014 30/11/2017 100 23/12/2018  
28 B.baria 14 kasba 105 273 RTIP-II/BRA/UZR-47.2 Kharera R&H to Shimrail GC via Kheora Bazar Road 2.86 659.38 Rana Builders (Pvt.) Ltd 592.12 17/12/2015 30/12/2017 100 23/12/2018  
29 B.baria 14 kasba 105 273 RTIP-II/BRA/UZR-1 Tinlacpir R&H to Shimrail GC via Chargas Bazar & Bhallabpur Road 2.98 597.36 M/S. Hasan Enterprise & M/S. Shahil Enterprise [M/S. HE & SE (JV)] 571.88 11/12/2014 30/03/2017 100 23/12/2018  
30 B.baria 14 nabinagar 106 273 RTIP-II/BRA/UZR-44-STR-16 Construction of 180 m Pre-stress girder bridge at Ch. 10+792 km on Nabinagar-B.Baria Rd-Border of Sadekpur U.P including 670 m approach road 180.00 1494.58 M/S. Hasan Enterprise & M/S. Mominul Hoque, [(HE-MH (JV)] 1432.08 10/12/2015 28/02/2019 96 94 08/04/2019  
31 B.baria 14 nabinagar 106 273 RTIP-II/BRA/UZR-91 Bitghar Hat to B.Baria R&H road via Kurighar Hat 3.78 2131.49 M/S. Hasan Enterprise & UDC Construction Ltd. (Hasan Ent.- UDC Con. (Ltd) JV 1971.63 02/01/2017 28/02/2019 78 75 08/04/2019  
32 B.baria 14 nabinagar 106 273 RTIP-II/BRA/RPM-178 a) Sreeghar GC to Jibongonj R&H road via Kadoir & Badda 4.20 138.71 M/S. MA Zaher & M/S Pintu Construction JV (MAZ-PC JV) 271.84 27/07/2015 10/10/2016 100 23/12/2018  
33 B.baria 14 nabinagar 106 273 RTIP-II/BRA/UZR-44 Nabinagar-B.Baria Road-Border of Sadekpur UP 4.80 1255.16 Rana Builders (Pvt.) Ltd. 1296.57 30/11/2014 08/03/2018 100 23/12/2018 Final
34 B.baria 14 nasirnagar 83 273 RTIP-II/BRA/UZR-46.4 Nasirnagar R&H-Bholakot Bazar-Chatalpar GC-Aurail Road (Nasirnagar Part) 4.57 1681.05 M/S. Hasan Enterprise & UDC Construction Ltd. (Hasan Ent.- UDC Con. (Ltd) JV 1640.06 23/07/2017 29/03/2018 80 75 08/04/2019  
35 B.baria 14 nasirnagar 83 273 RTIP-II/BRA/UZR-46.3 Nasirnagar R&H-Bholakot Bazar-Chatalpar GC-Aurail Road (Nasirnagar Part) 4.63 1448.01 Rana Builders (Pvt.) Ltd & M/S. Hassan Builders [(Rana Builders-Hassan Builders (JV)] 1386.89 28/05/2017 02/12/2018 98 86 08/04/2019  
36 B.baria 14 nasirnagar 83 273 RTIP-II/BRA/UZR-46.2 Nasirnagar R&H-Bholakot Bazar-Chatalpar GC-Aurail Road (Nasirnagar Part) 5.24 1573.33 Mozahar Enterprise (Pvt.) Ltd 1627.11 20/06/2017 28/01/2019 95 60 08/04/2019  
37 B.baria 14 nasirnagar 83 273 RTIP-II/BRA/UNR-2-STR-14 Construction of 36 m RCC Girder Bridge at Ch. 6+463 km on Dharmondal UP Office -Marakut Bazar Road (Fandauk Bazar) 91.50 0.00   0.00 31/05/2015 07/10/2017 100 23/12/2018  
38 B.baria 14 nasirnagar 83 273 RTIP-II/BRA/RPM-42.2 Nasirnagar R&H-Haripur GC-Madhabpur R&H Road via Chairkuri GC 9.16 375.96 M/S Shahil Enterprise 373.01 03/03/2013 30/08/2014 100 23/12/2018 Final
39 B.baria 14 nasirnagar 83 273 RTIP-II/BRA/RPM-42.1 Nasirnagar R&H-Haripur GC-Madhabpur R&H Road via Chairkuri GC 4.90 175.58 M/S Vigilant Construction 161.35 13/02/2013 14/06/2014 100 23/12/2018 Final
40 B.baria 14 nasirnagar 83 273 RTIP-II/BRA/UNR-2 Dharmondal UP Office-Marakut Bazar Road (Fundauk Bazar) 9.40 1135.89 M/S. Mohammad Eunus & Brothers (Pvt), Ltd 1209.96 27/10/2014 15/08/2017 100 23/12/2018  
41 B.baria 14 nasirnagar 83 273 RTIP-II/BRA/UZR-46.1 Nasirnagar R&H-Bholakot Bazar-Chatalpar GC-Aurail Road (Nasirnagar Part) 6.46 2402.44 Rana Builders (Pvt) Ltd & M/S. Hassan Builders (Rana Builders-Hassan Builders JV) 2306.01 18/04/2017 02/12/2018 84 23/12/2018  
42 B.baria 14 sarail 98 273 RTIP-II/BRA/RPM-177B Sarail-Arail hat Rd. 2.95 783.74 M/S Hasan Enterprise 813.13 17/09/2018 13/04/2019 0 23/12/2018  
43 B.baria 14 sarail 98 273 RTIP-II/BRA/RPM-177 b) Sarail-Arail hat Rd. 11.23 455.47 M/S. Mostafa Kalmal 0.00 24/05/2015 01/01/2018 100 23/12/2018  
44 Chandpur 12 chandpur-s 77 273 RTIP-II/CHA/RPM-180 b) Kallayanpur UP (Baburhat G.C)-Upazila H/Q (Bishnadi) Road via Kasim Bazar. 5.68 134.78   0.00 06/05/2015 30/05/2017 100 23/12/2018  
45 Chandpur 12 chandpur-s 77 273 RTIP-II/CHA/GCM-2 a) Improvement of Mohamaya GCM 2.00 85.82 Joint Venture of M/S. Aziz Brothers & Md. Mizanur Rahman Liton (JV of AB-MRL) 131.15 26/01/2015 28/12/2016 100 23/12/2018 Final
46 Chandpur 12 chandpur-s 77 273 RTIP-II/CHA/RPM-43.1 Chandpur (Bagadi R&H)-Chandra GC 8.25 162.80 Mizanur Rahman Liton 175.28 20/02/2013 11/02/2014 100 23/12/2018 Final
47 Chandpur 12 faridganj 78 273 CHA/RPM-179 Rehabilitation and periodic Maintenance of Faridgonj R&H-Rampur GC-Sollakhali R&H Road (Ch-0+000 15+475km) 0 15.48 0.00 0.00 43500000.00 Appolo Engineering Constraction Ltd 34243541.50 04/06/2015 11/06/2015 30/04/2017 75 4183000.00 36 08/04/2019 Cancel
48 Chandpur 12 faridganj 78 273 CHA/UNR-4 (A) Improvement of Latifgonj Bazar-Paschim Subidpur UP (Uttali) Road via Guher Bazar (Faridgonj Upazila). (B) Improvement of Khila Bazar (Khila Eidgah)-Shahrasti Bazar Road via Gabtoli (Shahrasti Upazila). (C) Improvement of Matlab-Master Bazar Ghosherhat Road (Matlab South Upazila) 13.40 0.00 0.00 82130047.00 Mohammed Eunus & Brothers (Pvt.) Ltd 93610298.80 13/10/2014 20/10/2014 30/06/2017 100 50.00 100 08/04/2019
49 Chandpur 12 faridganj 78 273 RTIP-II/CHA/RPM-339 Faridganj GC-Chandra GC Road. 9.35 661.48 Mohammed Eunus & Brothers (Pvt.) Ltd 616.82 19/02/2017 30/06/2018 94 23/12/2018  
50 Chandpur 12 faridganj 78 273 RTIP-II/CHA/RPM-179 Faridgonj R&H-Rampur GC-Sollakhali R&H Road 15.48 419.76 Appollo Engineering & Construction Ltd. 342.44 11/06/2015 30/04/2017 75 23/12/2018  
51 Chandpur 12 faridganj 78 273 RTIP-II/CHA/RPM-43.2 Faridganj GC-Rupsha GC 5.40 89.76 M/S. Aziz & Brothers 98.25 24/02/2013 05/05/2014 100 23/12/2018 Final
52 Chandpur 12 faridganj 78 273 RTIP-II/CHA/UNR-4 a) Latifgonj Bazar-Paschim Subidpur UP (Uttali) Road via Guher Bazar 4.70 274.18 M/S. Mohammad Eunus & Brothers (Pvt), Ltd 910.87 26/10/2014 30/06/2017 100 23/12/2018 Final
53 Chandpur 12 faridganj 78 273 CHA/RPM-339 Rehabilitation and periodic Maintenance of Faridganj GC-Chandra GC Road at (Ch.0+000 - 9+350km) 0 9.35 0.00 0.00 66147557.00 0 0.00 0 01/02/2017 NOA Issued
54 Chandpur 12 haimchar 79 273 CHA/UZR-96.2 Improvement of Chandpur puran bazar (Nayani bazar)-Haimchar-Charbhairabi Road (ch. 6+953-12+083km) 0 5.13 0.00 0.00 89452696.00 Mashiure Rahman Chowdhury 83394637.80 31/01/2017 07/02/2017 14/03/2018 52 0.00 24 08/04/2019 WMM is on going
55 Chandpur 12 haimchar 79 273 CHA/UZR-96.1 Improvement of Chandpur puran bazar (Nayani bazar)-Haimchar-Charbhairabi Road (ch. 0+ 000-6+953km) 0 6.95 0.00 0.00 106702459.00 M/S Paradise Tra. & Mashiure Rahman JV 99269796.17 31/01/2017 07/02/2017 14/03/2018 85 0.00 69 08/04/2019 WMM complete
56 Chandpur 12 haimchar 79 273 RTIP-II/CHA/RPM-340 Haimchar Upazila H/Q-Madina market R&H via Ananda bazar Road. 5.12 358.86 RAB-RC (PVT) Limited-M/S. Patwary Construction (JV) 328.78 06/02/2017 11/12/2017 100 23/12/2018 Final
57 Chandpur 12 haimchar 79 273 RTIP-II/CHA/RPM-138 b) Charbharabi U.P Office-Shahorali Mour road 3.05 72.51   0.00 25/05/2014 19/07/2015 100 23/12/2018  
58 Chandpur 12 haimchar 79 273 RTIP-II/CHA/UZR-96.2 Chandpur Puran bazar-Haimchar-Charbhairabi Road (Haimchar Part) 5.13 894.53 Moshiur Rahman Chowdhury 833.95 07/02/2017 30/06/2018 49 23/12/2018  
59 Chandpur 12 haimchar 79 273 RTIP-II/CHA/UZR-96.1 Chandpur Puran bazar-Haimchar-Charbhairabi Road (Haimchar Part) 6.95 1067.02 M/S. Paradise Traders & Moshiur Rahman Chowdhury JV 992.70 07/02/2017 30/06/2018 81 23/12/2018  
60 Chandpur 12 haziganj 80 273 RTIP-II/CHA/RPM-45.2 Balakhal-Rampur-Narayanpur 5.35 157.46 M/S. Amena International 163.92 18/02/2013 08/12/2013 100 23/12/2018 Final
61 Chandpur 12 haziganj 80 273 RTIP-II/CHA/UZR-45 Belchow-Ramchandrapur-Sameshpur-Nadighat road. 7.75 1076.32 RBL-HB-ZT JV 1063.23 15/03/2015 16/12/2015 100 23/12/2018 Final
62 Chandpur 12 haziganj 80 273 CHA/UZR-45 Improvement of Belchow-Ramchandrapur-Sameshpur-Nadighat road (Ch. 00-7+785km) 0 7.75 0.00 0.00 107632405.00 RBL-HBZT JV 106375347.00 08/03/2015 15/03/2015 05/09/2016 100 102828000.00 100 01/02/2017
63 Chandpur 12 kachua 90 273 RTIP-II/CHA/RPM-337 Pathair-Mazigacha-Nandanpur bazar road. 4.96 265.71 Pioneer Construction 254.16 06/02/2017 30/06/2018 59 23/12/2018  
64 Chandpur 12 kachua 90 273 RTIP-II/CHA/RPM-334 Sachar-Bardail-Nayergoan road (Kachua portion) 5.83 307.21 A.A Trading Construction 265.87 30/06/2016 12/08/2017 41 23/12/2018  
65 Chandpur 12 kachua 90 273 RTIP-II/CHA/RPM-181 b) Asrafpur (Kathal bagan)-Jagatpur bazar road. Via Asrafpur UP 3.83 117.84   0.00 14/06/2015 10/02/2019 0 23/12/2018  
66 Chandpur 12 kachua 90 273 RTIP-II/CHA/RPM-139 a) Kachua-Raghunathpur G.C road 6.50 112.71 JV of Tania & Shahid 123.56 01/04/2014 11/06/2015 100 23/12/2018 Final
67 Chandpur 12 kachua 90 273 CHA/RPM-334 Rehabilitation and periodic Maintenance of Sachar-Bardali-Nayergoan Road (Kachua Portion