Project Scheme Detail List
SL No. Package No. Name Length (Km) Allotment (Lac) Name of Contractor Contract Amount (Lac) Date of Commencement Date of Completion Physical Progress (%) Date of Progress Update Remarks
1 Galachipa
1 e-GP/CTEIP/2017-18/GAL/BLS-01 Construction of 02 nos Boat Landing Station at Galachipa Ferry Ghat and Arrotpotti Ghat under Galachipa Pourashava, District: Patuakhali 2.0000 214.513 M/S Palli Stors -M/S Gazi Construction (JV) 214.513 25/07/2018 20/03/2021 100 11/05/2022  
2 e-GP/CTEIP/2017-18/GAL/MM-01 Construction of Multi Purpose Super Market Complex, Ward # 04, Galachipa Pourashava, District: Patuakhali 1.0000 135.744 KE-MC JVCA 135.744 19/06/2018 18/01/2020 100 11/05/2022 Completed
3 e-GP/CTEIP/2017-18/GAL/BR-01 Construction of 04 nos RCC Bridge at Galachipa Pourashava, District: Patuakhali 57.0000 481.301 QC-PS-DCL (JV) 481.301 13/06/2018 20/03/2021 100 11/05/2022  
4 e-GP/CTEIP/2017-18/GAL/RD/03 Improvement / Construction of Five (05) Nos Road Total length 3.89 Km with 246m Road side Drain, 08 Nos Box Culvert, 07 Nos Cross drain, 30 Nos RCC Sitting Bench & 445m Protection work under Galachipa Pourashava, Patuakhali. 3.8900 492.616 M/S Palli Stores 492.616 15/03/2018 13/09/2019 91 11/05/2022  
5 e-GP/CTEIP/2015-16/GAL/DR-01 Re excavation of 3 nos. Khal totaling 2.833 Km and Constructing of 4 nos. RCC drain, totaling 1.88 Km under Galachipa Pourashava, District: Patuakhali 4.7100 371.082 MN Mallik-Monalisa Ltd (JV) 371.082 16/02/2016 31/12/2021 100 11/05/2022  
6 e-GP/CTEIP/2014-15/GAL/WS-01 Construction of Two Production TW; One OHT, Pipeline (30 km Distribution and Transmission; 3.4 km Replaced Pipeline and 2500 Service Connection); Two Pump Houses; Supply of O & M tools and Supply, fitting, fixing and commissioning of Electro-mechanical wo 33.5000 1121.296 M/S. Zilani Traders 1121.296 14/01/2016 25/12/2020 100 11/05/2022 Completed
7 e-GP/CTEIP/2018-19/GAL/RD-04 Construction/ Improvement of 4 no. Road with 407m Road Side Drain under Galachipa Pourashava 1.9800 459.390 M/S. Kohinoor Enterprise & Mizanur Alom (JV) 459.390 30/10/2019 30/10/2020 100 09/05/2022 Works Ongoing
8 CTEIP/2014-15/GAL/CS-01 Construction of 3 nos. Multipurpose Cyclone Shelters at (1) Furfura Sharif Talimul Quran Madrasha (Ward-02); (2) Galachipa Degree College Compound (Ward-09); and (3) Sarshina Khanka Hafezia Madrasha (Ward-03), under Galachipa Pourashava, Upazila Galachipa 3.0000 1171.688 MK-MF (JV) 1171.688 02/01/2015 31/12/2017 100 04/04/2021 Completed
9 e-GP/CTEIP/2016-17/GAL/PT-01 Construction of 3 nos Public Toilets under Galachipa Pourashava, District: Patuakhali 3.0000 74.893 M/S Siam Ent. 74.893 31/05/2017 30/11/2018 100 04/04/2021 Completed
10 e-GP/CTEIP/2014-15/GAL/RD-02 Improvement of 02 nos. Roads (1) Feeder road (Ward-07); and (2) Samudabad Road (Ward-06-08), totaling 1.195 km and 02 nos. Roadside Drains, totaling 0.923 km under Galachipa Pourashava, Upazila – Galachipa, District: Patuakhali 1.1950 295.241 M.M. Enterprise 295.241 15/11/2015 30/04/2017 100 04/04/2021 Completed
11 CTEIP/2014-15/GAL/RD-01 Construction / Improvement of 5 roads; total length 6.555 km, under Galachipa Pourashava, Upazila Galachipa, District: Patuakhali 6.5550 1035.121 M/S. S M Construction 1035.121 03/02/2015 31/12/2016 100 04/04/2021 Completed
2 Kalapara
1 e-GP/CTEIP/2017-18/KAL/BT-01 Construction of Bus terminal (Two storied Terminal Building with 3 storied foundation) at Kalapara Pourashava, District: Patuakhali 1.0000 269.667 M/S Palli Stores 269.667 09/04/2018 30/10/2021 100 11/05/2022  
2 e-GP/CTEIP/2017-18/KAL/BLS-01 Construction of 01 no Boat Landing Stations with approach road at Kalapara Pourashava, District: Patuakhali 1.0000 63.161 M/S Abul Kalam Azad 63.161 22/06/2018 21/12/2019 100 11/05/2022 Completed
3 e-GP/CTEIP/2017-18/KAL/RD-03 Improvement of Three (03) Nos Road by rigid pavement totaling 0.870 Km with road Side drain at Kalapara Pourashava, District: Patuakhaii 0.8700 211.352 M/S Palli Stores 211.352 15/05/2018 30/10/2021 100 11/05/2022  
4 e-GP/CTEIP/2016-17/KAL/WS-01 lnstallation of one Production TW, One OHT, Pipeline (23.30 km Distribution and Transmission , 5.76 km replaced Pipeline and 1800 Service Connection , 500 Replaced Service connection) One Pump House Supply of O & M tools and Supply, fitting, fixing and Co 28.6000 1254.104 M/S Zilani Traders 1254.104 01/12/2016 13/12/2020 100 11/05/2022 Completed
5 e-GP/CTEIP/2016-17/KAL/DR/01 Construction of 10 nos RCC drain at kalapara pourashava 3.7830 728.078 Md. Eunus Al Mamun 728.078 16/02/2017 30/09/2019 100 11/05/2022  
6 e-GP/CTEIP/2016-17/KAL/RD-01 Improvement of 10 nos. Road, totaling 6.070 Kms, including 0.132 km road side drain at kalapara pourashava. 6.0700 770.794 M/S. Palli Store 770.794 25/10/2016 30/09/2019 100 11/05/2022 Completed
7 e-GP/CTEIP/2017-18/KAL/PT-01 Construction of 02 nos Public Toilets at kalapara Pourashava, District: Patuakhali 2.0000 64.618 M/S Palli Stores 64.618 22/06/2018 21/12/2019 100 09/05/2022  
8 e-Gp/CTEIP/2018-19/KAL/RD-04 Improvement of Four (04) Nos. Road Total 1808 m Rigid and 834 m Flexible Pavement 2.6400 374.650 M/S SH Enterprise- M/S Athai Enterprise 374.650 14/02/2019 13/08/2020 100 04/04/2021 WorkS Completed
9 eGP/CTEIP/2016-17/KAL/DR/02 Construction of 7 Nos RCC Drain Totaling 1.503 km at Kalapara Pourashava, District: Patuakhali 1.5000 199.757 RC-SHE-AK (JV) 199.757 24/03/2017 24/09/2018 100 04/04/2021 Completed
10 e-GP/CTEIP/2015-16/KAL/CS-01 Construction of Two Multipurpose Cyclone Shelters at (1) Basonti Mondol Government Primary School (ward no-01) and (2) Badurtali Government Primary School (ward no-09) under Kalapara Pourashava 2.0000 788.021 M/S. Palli Store 788.021 30/06/2016 10/09/2018 100 04/04/2021 Completed
11 e-GP/CTEIP/2016-17/KAL/BR-01 Construction of 03 vent Box culvert over Notun Bazar canal (Atimkhana) near Salam vendor office Mohallah (war no-02,04) and Construction of 03 vnet Box culvert over Nazrul Islam road near Mosque (ward n0-04,05) at Kalapara Pourashava 12.0000 85.156 Md. Reaz Uddin 85.156 08/12/2016 07/12/2017 100 04/04/2021 Completed
12 e-GP/CTEIP/2016-17/KAL/RD-02 Improvement of 3 nos road totaling 8.438km at kalapara pourashava. 8.4380 568.854 M/S. Rupali Construction & SHE (JV) 568.854 16/10/2017 26/03/2019 100 04/04/2021 Completed
3 Patuakhali-s
1 e-GP/CTEIP/2021-22/PAT/RD-06 1) Construction of Road by placing Uniblock with Sidewalk from DFO Banjlow to Dc Banglow in Ward No.07, Total Length:290m+160m=450m 2) Construction of RCC Drain with Sidewalk and Cycle Lane from Circuit house to DC Banglow in Ward No.07, Total Length : 290m+160m=450m3) Widening of RCC Road and Cycle Lane from south side of DCBanglow to B-Type Bazar in Ward No.07,Total Length:450m 4) Construction oc RCC Darin with Sidewalk stating from B-Type Road to Sonali Bank turning in Ward No.08, Ch0.00-360m.Total Length 360m. 1.7100 971.000 971.000 26/12/2021 26/04/2022 36 18/05/2022 work Ongoing
2 e-GP/CTEIP/2017-18/PAT/RD-04 Improvement of 04 nos Road under Patuakhali Pourashava 2.9000 593.398 M/S Quashem Construction- M/S Palli Store (JV) 593.398 30/08/2018 01/03/2020 100 11/05/2022  
3 e-GP/CTEIP/2017-18/PAT/CSR-01 Construction of Cyclone Shelter at Hazi Hamej Uddin Mridha College Under Ward 01 with Access Road namely Donavan School at 2 no. Bandh to Al- Amin Lillah Boarding at Sluice Gate via Hamej Uddin Mridha College. 1.0000 554.492 M/S Abul Kalam Azad 554.492 07/05/2018 03/01/2020 100 11/05/2022  
4 e-GP/CTEIP/2017-18/PAT/RD-02 Improvement of College Road from Patuakhali Govt. Mohila College to 02 no Sluice Gate (Bandh Ghat) via Patuakhali Govt. College by Rigid Pavement (Ward no 05, 02 & 04) under Patuakhali Pourashava 1.6700 562.428 M/S Palli Store 562.428 23/04/2018 22/10/2019 96 11/05/2022  
5 e-GP/CTEIP/2017-18/PAT/RDR-01 Improvement of Three (03) Nos. Road Total 2258 m Rigid and 1727 m Flexible Pavement with 877 m drain, 02 Nos Cross drain ,16 nos Box Culvert and 74.4 m Protection Work under Patuakhali Pourashava. 3.9900 803.023 DCL-MPS-MGC (JV) 803.023 18/06/2018 31/05/2021 100 11/05/2022  
6 e-GP/CTEIP/2016-17/PAT/RD-03 Improvement of 1 (one) no RCC road totaling 850m with 705m road side drain 04 nos cross drain 03 nos pipe cross drain and 68.20m C.C block at Patuakhali Pourashava, District: Patuakhali 0.8500 355.808 M.M Builders & Engineers 355.808 25/05/2017 30/01/2020 100 11/05/2022  
7 e-GP/CTEIP/2016-17/PAT/DR-01 Construction of 05 (Five) nos. RCC Drain totaling 3.549 kms. With 1.569 kms. foothpath, 02-nos box culvert and 04-nos RCC cross drain Under patuakhali Pourashava, District: Patuakhali under Coastal Towns Environmental Infrastructure Project. 3.5670 728.921 Md Reaz Uddin JV 728.921 26/07/2017 25/07/2019 100 09/05/2022  
Total : 203.4180 (Km) 15800.17 (Lac) 15800.17 (Lac)