Project Scheme Detail List
SL No. Package No. Name Length (Km) Allotment (Lac) Name of Contractor Contract Amount (Lac) Date of Commencement Date of Completion Physical Progress (%) Date of Progress Update Remarks
1 Austagram
1 HILIP/17/WD4/VR-KIS/Aus -02 Improvement of Dalarkandi road (Ch.5500 - 5850m); 0.3500 17.349 LCS; 1 no group 17.349 24/04/2019 10 19/01/2019 Community Road
2 HILIP/16/WD4/VR-KIS/Aus -28 Improvement of Adampur - Shibpur Ferryghat road (Ch.2000 - 3000m); 1.0000 49.570 LCS; 3 nos groups 49.570 30/11/2018 10 19/01/2019 Community Road
3 HILIP/16/WD4/VR-KIS/Aus -27 Improvement of Adampur - Shibpur Ferryghat road (Ch.1000 - 2000m); 1.0000 49.570 LCS; 3 nos groups 49.570 30/11/2018 10 19/01/2019 Community Road
4 HILIP/16/WD4/VR-KIS/Aus-25 Part-A) Improvement of Adampur - Shibpur Ferryghat road (Ch.5000 - 6000m); Part-B) Improvement of Adampur - Shibpur Ferryghat road (Ch.6000 - 7015m); 1.0000 49.570 LCS; 3 nos groups 49.570 30/11/2018 10 19/01/2019 Community Road
5 HILIP/16/WD4/VR-KIS/Aus-24 Part-A) Improvement of Adampur - Shibpur Ferryghat road (Ch.3000 - 4000m); Part-B) Improvement of Adampur - Shibpur Ferryghat road (Ch.4000 - 5000m); 1.0000 49.570 LCS; 3 nos groups 49.570 30/11/2018 45 19/01/2019 Community Road
6 HILIP/14/WD15/ VR-KIS/Aus-81 Improvement of Dalarkandi Road (Ch 3000-5500m) with 6 nos U-Drain size 0.625mx0.60m at ch. 3060m, 6260m, 4260m, 4560m, 4965m & 5200m; 2.5000 123.925 LCS; 6 nos groups 123.925 30/04/2017 100 19/01/2019 Community Road
7 HILIP/14/WD15/ VR-KIS/Aus-80 Improvement of Kariral Ferryghat-Shibpur Ferryghat Road (Ch.3100-4250m); 1.1500 57.005 LCS; 3 nos groups 57.005 30/04/2017 100 19/01/2019 Community Road
8 HILIP/14/WD15/ VR-KIS/Aus-79 Improvement of Batinagar - Paon Road (Ch 2000-3850m) with 5 nos RCC U-Drain size 0.625mx0.60m at ch. 2120m, 2445m,2740m,3360m & 5570m: 1.8500 91.704 LCS; 5 nos groups 91.704 30/04/2017 100 19/01/2019 Community Road
9 HILIP/14/WD15/ VR-KIS/Aus-75 Improvement of Batinagar - Paon Road (Ch 3850-5700m) with 5 nos RCC U-Drain at ch.4650m, 5050m, 5235m,5540m & 5570m; 1.8500 91.704 LCS; 5 nos groups 91.704 30/04/2017 100 19/01/2019 Community Road
10 HILIP/14/WD15/ VR-KIS/Aus-52 Improvement of Kariral Ferryghat-Shibpur Ferryghat Road (Ch.1350-3100m); 1.7500 86.747 LCS; 6 nos groups 86.747 09/03/2016 100 19/01/2019 Community Road
11 HILIP/14/WD15/ VR-KIS/Aus-51 Improvement of Kariral Ferryghat-Shibpur Ferryghat Road (Ch 00-1350m); 1.3500 66.919 LCS; 4 nos groups 66.919 30/04/2017 100 19/01/2019 Community Road
12 HILIP/14/WD15/ VR-KIS/Aus-33 Improvement of Dalarkandi Road (Ch 1000-3000m); 2.0000 99.140 LCS; 6 nos groups 99.140 02/11/2015 100 19/01/2019 Community Road
13 HILIP/14/WD15/ VR-KIS/Aus-32 Improvement of Austagram - Hablibari Road (Ch.1300-2633m); 1.3330 66.076 LCS; 4 nos groups 66.076 01/12/2015 100 19/01/2019 Community Road
14 HILIP/14/WD15/ VR-KIS/Aus-31 Improvement of Batinagar - Paon Road (Ch 00-2000m); 2.0000 99.140 LCS; 7 nos groups 99.140 22/11/2015 100 19/01/2019 Community Road
15 HILIP/13/WD5/KIS-29 Improvement of Dalarkandi Road (Ch. 00-1000 m): 1.0000 49.570 LCS; 7 nos groups 49.570 07/05/2015 100 19/01/2019 Community Road
16 HILIP/KIS/COM-002 Improvement of Purba Austagram UP Office -Pukurpar Mor Road (Ch. 00-780m); 0.7800 38.664 LCS; 8 nos groups 38.664 25/05/2014 100 19/01/2019 Community Road
17 HILIP/KIS/COM-001 Improvement of Austagram - Hablibari Road (Ch. 546-1300m); 0.7540 37.375 LCS; 8 nos groups 37.375 25/05/2014 100 19/01/2019 Community Road
18 HILIP/15/WD5/UNR-KIS/Aus-02 Part-A)Improvement of Bangalpara-Humayunpur UP Office Road (ch.7100-8200m) with 5 nos U-drain at ch.7130m,7545m,7880m, 8110m & 8150m; Part-B)Improvement of Bangalpara-Humayunpur UP Office Road (ch.8200-9150m) with 3 nos U-drain at ch.8308m,8385m & 8650m; 1.1000 143.500 M/S Zillur Enterprise, 45/1/A purana Pultan,Dhaka 143.500 26/05/2017 100 19/01/2019 Union Road
19 HILIP/15/WD5/UNR-KIS/Aus-01 Part-A) Improvement of Abdullahpur-Adampur UP Office via Meghna Ferryghat Road (ch.4175-5675m) with 8 nos U-drain at ch. 4395m, 4490m, 4625m, 4810m, 5045m, 5285m & 5435m; Part-B) Improvement of Abdullahpur-Adampur UP Office via Meghna Ferryghat Road (ch. 5675-7240m) with 2 nos U-drain at ch. 5975m & 6090m; Part-C) Improvement of Abdullahpur-Adampur UP office via Meghna Ferryghat Road (ch. 7240-8940m) with 2 nos U-drain at ch.7590m & 7840m; 1.5000 333.900 M/S Mominul Haque, Bhairab, Kishoreganj 333.900 19/03/2017 75 19/01/2019 Union Road
20 HILIP/14/WD5/UNR-KIS/Aus-11 Improvement of Bangalpara-Humayunpur UP Office Road (ch. 5100-7100m) with 375m Slop Protection work & 5 nos U-drain at ch. 5340m, 5560m, 5707m, 6900m, 7100m; 2.0000 140.000 M/S Shamim Construction, Pakundia, Kishoreganj 140.000 04/04/2016 100 19/01/2019 Union Road
21 HILIP/14/WD5/UNR-KIS/Aus-10 Improvement of Abdullahpur-Adampur UP Office via Meghna Ferryghat Road (ch.1175-4175m) with 8 nos U-drain ch.1275m,1965m, 2080m, 2575m, 3000m, 3500m, 3700m & 3950m; 3.0000 210.000 M/S Mominul Haque, Bhairab, Kishoreganj 210.000 30/06/2018 100 19/01/2019 Union Road
22 HILIP/13/WD5/KIS-17 Improvement of Bangalpara-Humayunpur Road (Ch. 3065-3648 & 3689-4100m); 0.9940 69.580 M/S Challenger, Batrish, Kishoreganj 69.580 29/12/2014 100 19/01/2019 Union Road
23 HILIP/13/WD5/KIS-16 Improvement of Bangalpara-Humayunpur Road (Ch. 2195-3065m); 0.8700 60.900 M/S Challenger, Batrish, Kishoreganj 60.900 29/12/2014 100 19/01/2019 Union Road
24 HILIP/13/WD5/KIS-15 Improvement of Bangalpara-Humayunpur Road (Ch.1400-1635 & 1695-2195m); 0.7350 51.450 M/S Mominul Haque, Bhairab, Kishoreganj 51.450 09/03/2015 100 19/01/2019 Union Road
25 HILIP/13/WD5/KIS-14 Improvement of Bangalpara-Humayunpur Road (Ch. 565-1400m); 0.8350 58.450 M/S Mithamoin Builders, Mithamoin, Kishoreganj 58.450 25/02/2015 100 19/01/2019 Union Road
26 HILIP/KIS/UNR-003 Improvement of Abdullahpur-Adampur UP office via Meghna Ferryghat Road (Ch.00-1000m); 1.0000 70.000 M/S Shahidul Islam James, Austagram, Kishoreganj. 70.000 26/03/2014 100 19/01/2019 Union Road
27 HILIP/15/WD3/UZR-KIS/Aus-09 Part-A)Improvement of Austagram-Mohishertillia-Gagra GC -Mithamoin road (Ch. 3570m-11490m); Part-B)Const. of 1x2.00mx2.00m RCC Box Culvert Ch. 3620m on the same alignment; Part-C) Const. of 28 nos U-drain size .625mx0..06m in Diff. Chainage on the same alignment; Part-D)Const. of 20 nos Pipe Culvert in Diff. Chainage on the same alignment; 7.9200 1108.403 Shamim Enterprise (Pvt.) Ltd, Mymensingh 1108.403 30/12/2017 39 19/01/2019 Ongoing (Upazila Road)
28 HILIP/15/WD4/UZR-KIS /Aus-03 Improvement of Austagram – Adampur GC Road (ch. 7430m-8110m); 0.6800 54.400 Escon Trading and Construction, 57/14,Tejturi Bazar, Chalk Lane, East Raza Bazar, Dhaka 54.400 30/05/2017 100 19/01/2019 Upazila Road
29 HILIP/14/WD4/UZR-Kis /Aus-09 Part-A: Improvement of Austagram-Adampur GC Road (Ch. 11750m-13500m); Part-B: Const. of 1x2.00mx2.00m & 3x4.00mx3.30m RCC Box Culvert at ch.10910m,12650m at same road; 1.7500 140.000 M/S Challenger, Batrish, Kishoreganj 140.000 31/12/2016 100 19/01/2019 Upazila Road
30 HILIP/14/WD4/UZR-Kis /Aus-08 Improvement of Austagram-Adampur GC Road (Ch. 9550m-11750m); 2.2000 176.000 M/S Challenger, Batrish, Kishoreganj 176.000 22/03/2016 100 19/01/2019 Upazila Road
31 HILIP/13/WD-4/KIS-7 Improvement of Austagram-Adampur GC Road (Ch.14500-15500m); 1.0000 80.000 M/S Shamim Construction, Pakundia,Kishoreganj 80.000 10/03/2015 100 19/01/2019 Upazila Road
32 HILIP/13/WD-4/KIS-6 Improvement of Austagram-Adampur GC Road (Ch. 13500-14500m); 1.0000 80.000 M/S Shamim Construction, Pakundia, Kishoreganj 80.000 04/02/2015 100 19/01/2019 Upazila Road
33 HILIP/KIS/UZR-001 Improvement of Austagram-Adampur GC Road (Ch. 8200-9200m); 1.0000 80.000 M/S Shahidul Islam James, Austagram, Kishoregonj. 80.000 30/03/2014 100 19/01/2019 Upazila Road
2 Itna
1 HILIP/14/WD15/ VR-KIS/Itn-70 Improvement of Dram Ferryghat -Arailia Ferryghat Road (ch 4412m -5712) with 4 nos RCC U-Drain 1X0.625mX0.550m at ch.4602m,4782m,4932m & 5022m; 1.3000 64.441 LCS; 4 nos groups 64.441 31/05/2017 100 19/01/2019 Community Road
2 HILIP/14/WD15/ VR-KIS/Itn-69 Improvement of Dram Ferryghat -Arailia Ferryghat Road(ch 3000 - 4412m) with 5 nos RCC U-Drain 1X0.625mX0.550m at ch.3090m,3981m,4062m,4182m & 4332m; 1.4120 69.992 LCS; 4 nos groups 69.992 31/05/2017 100 19/01/2019 Community Road
3 HILIP/14/WD15/ VR-KIS/Itn-68 Improvement of Dram Ferryghat -Arailia Ferryghat Road (ch. 2000- 3000m) with 4 nos RCC U-Drain 1X0.625mX0.550m at ch. 20602m,2390m, 2765m & 2880; 1.0000 49.570 LCS; 3 nos groups 49.570 31/05/2017 100 19/01/2019 Community Road
4 HILIP/14/WD15 /VR-KIS/Itna-46 Improvement of Dram Ferryghat -Arailia Ferryghat Road (ch.00 -2000m); 2.0000 99.140 LCS; 5 nos groups 99.140 31/12/2016 100 19/01/2019 Community Road
5 HILIP/14/WD15 /VR-KIS/Itna-45 Improvement of Baribari-Shaila Road(ch.00- 2000m); 2.0000 99.140 LCS; 6 nos groups 99.140 28/02/2017 100 19/01/2019 Community Road
6 HILIP/14/WD15 /VR-KIS/Itna-37 Improvement of Dailong -Kathair Road (Ch.00-3500m); 3.5000 173.495 LCS; 10 nos groups 173.495 28/02/2017 100 19/01/2019 Community Road
7 HILIP/13/WD15/ KIS-12 Improvement of Haripur-Pongdulan – Uttar Razi Hat Road (Ch. 00-2500m); 2.5000 123.925 LCS; 18 nos groups 123.925 31/05/2015 84 19/01/2019 Community Road
8 HILIP/17/WD3/UNR-KIS/Itn - 02 Part-A) Improvement of Raytuti UP-Uttar Razi - Kalna Hat Road (ch. 00 – 1125m); Part-B) Const. of 4 nos U-Drain (Size 0.60mx0.60m) at ch. 30m, 360m, 730m & 860m on the same road; 1.1250 78.750 Md.Sarwar Jahan, Jahangirpur, Madan, Netrakona 78.750 05/06/2019 50 19/01/2019 Union Road
9 HILIP/16/WD3/UNR-KIS/Itn-03 Improvement of Itna - Silni-Elongjuri Road (ch.00 - 1000m & 6500 - 6990m) with 5 Nos U-drain (Size: 0.60mx0.625m) at ch.150m, 875m, 930m, 6700m & 6850m; 1.4900 104.300 bbejvroy, Ukilpara, Kishoreganj 104.300 05/11/2018 0 19/01/2019 Union Road
10 HILIP/14/WD5/UNR-KIS/Itn-18 Improvement of Raytuti UP-Uttar Razi- Kalan Hat Road at Ch.3870-4870m with 3 nos U-drain at ch. 4086m, 4127m & 4434m; 1.0000 70.000 M/S Shameem Construction Pakundia,Kishoreganj 70.000 23/02/2016 100 19/01/2019 Union Road
11 HILIP/14/WD5/UNR-KIS/Itn-17 Improvement of Chowganga UP- Chandpur Hat road at (Ch.00-1165m); 1.1650 81.550 M/S Challenger, Batrish, Kishoreganj. 81.550 23/02/2016 100 19/01/2019 Union Road
12 HILIP/14/WD5/UNR-KIS/Itn-09 Improvement of Itna-Silni-Elongjuri road (Ch.3000-4900m) with 6 nos U-drain at ch.3085m, 3500m,3950m, 4375m, 4650m, & 4800m; 1.9000 133.000 M/S Bhati Bangla Enterprise Ukilpara, Kishoreganj. 133.000 21/02/2016 100 19/01/2019 Union Road
13 HILIP/13/WD5/KIS-19 Improvement of Chowganga UP-Chandrapur hat Road (Ch.1500-3000m); 1.5000 105.000 M/S Osman Gani, Tarapasha, Kishoreganj 105.000 25/12/2014 100 19/01/2019 Union Road
14 HILIP/13/WD5/KIS-18 Improvement of Itna-Silni-Elongjuri Road (Ch.4900-6500m); 1.6000 112.000 M/S Shahil Enterprise, Station Road, Kishoreganj 112.000 29/12/2014 100 19/01/2019 Union Road
15 HILIP/KIS/UNR-002 Improvement of Itna -Silni-Elongjuri Road (Ch.2000-3000m); 1.0000 70.000 M/S Bhati Bangla Enterprise, Ukilpara, Kishoreganj 70.000 01/04/2014 100 19/01/2019 Union Road
16 HILIP/KIS/UNR-001 Improvement of Itna -Silni-Elongjuri Road (Ch.1000-2000m); 1.0000 70.000 M/S J. A Traders, Harua, Kishoreganj 70.000 30/03/2014 100 19/01/2019 Union Road
17 HILIP/16/WD2/UZR-KIS/Itn-01 Part-A)Improvement of Itna – Jawar hat via Raituty Hizaljani Road (ch.10745- 14200m); Part-B) Const. of 1 no RCC Box Culvert Size: 1.00m x 1.00m & 2 vent 3.00mx3.00m RCC Box Culvert at ch. 11115m & 13681 on same road; Part-C) Const. of 9 nos U-Drain Size : 1.00m x 1.00m at ch.11295m, 11395m, 11810m, 12205m,12550m, 12580m, 12832m, 12900m & 14030m on the same road; 3.4550 276.400 maw.mc.jv@gmail.com,Pakundia,Kishoreganj 276.400 17/02/2018 42 19/01/2019 Upazila Road
18 HILIP/15/WD4/UZR-KIS/Itn-05 Improvement of Jawar hat via Raituty Hazaijani Road (Ch. 7685-10695m) with 7 nos (size .075mx0.75m) U-drain at ch. 8400m,8777m,9296m,9634m,9907m & 10011m; 3.0100 240.800 M/S Mominul Haque, Bhairab, Kishoreganj 240.800 10/05/2017 95 19/01/2019 Upazila Road
19 HILIP/14/WD4/UZR-Kis/Itna-15 Improvement of Itna -Jawar hat via Raituti Hazaljani Road (ch.6685 -7685m) with 2 nos 1X0.625mX0.550m U-drain at ch-6775m & 7321m ; 1.0000 80.000 M/S Challenger, Batrish, Kishoreganj. 80.000 31/03/2017 100 19/01/2019 Upazila Road
20 HILIP/14/WD4/UZR-Kis/Itna-14 Improvement of Itna -Jawar hat via Raituti Hazaljani Road (ch.5685 -6685m) with 5 nos 1X0.625mX0.550m U-drain at ch-5835m,5885m,5995m,6215m,6580m; 1.0000 80.000 M/S Challenger, Batrish, Kishoreganj. 80.000 31/03/2017 100 19/01/2019 Upazila Road
21 HILIP/14/WD4/UZR-Kis/Itna-11 Improvement of Itna -Azmiriganj GC Road (ch.12000 -14250m); 2.2500 180.000 MAW-RJ (JV), Madan, Netrakona 180.000 25/07/2016 100 19/01/2019 Upazila Road
3 Mithamoin
1 HILIP/15/WD4/VR-KIS/Mit-30 Improvement of Kewarjure UP Office to Kazirkhala Ferry Ghat Road (ch.2000 - 4075m) with 3 nos RCC U-Drain (Size:0.60mx0.625m) at ch. 3885m, 3825m, & 4070m; 2.0750 102.857 LCS; 7 nos groups 102.857 02/09/2017 77 19/01/2019 Community Road
2 HILIP/14/WD15/ VR-KIS/Mit-84 Improvement of Mithamoin Bazar - Sadar Road (Ch.2000-4000m); 2.0000 99.140 LCS; 14 nos groups 99.140 31/05/2018 99 19/01/2019 Community Road
3 HILIP/15/WD15 /VR-KIS/Mit-11 Improvement of Kulkulir Khal to Noabad Road (Ch 2760--3760m) with 2 nos RCC U-Drain at ch. 3050m & 3300m; 1.0000 49.570 LCS; 3 nos groups 49.570 19/09/2016 100 19/01/2019 Community Road
4 HILIP/14/WD15/ VR-KIS/Mit-81 Improvement of Kewarjure UP Office to Kazir khala Feri ghat Road (ch.00 -2000m) with 6 nos U-Drain (size: 0.625m x 0.60m) at ch.235m,375m,575m,1200m,1452m & 1680m; 2.0000 99.140 LCS; 6 nos groups 99.140 28/02/2017 100 19/01/2019 Community Road
5 HILIP/14/WD15/ VR-KIS/Mit-76 Improvement of Kulkulir Khal to Noabad Road (Ch. 3760-5134m) with 1 nos RCC U-Drain at ch. 4920m; 1.3740 68.109 LCS; 4 nos groups 68.109 20/06/2016 100 19/01/2019 Community Road
6 HILIP/14/WD15 /VR-KIS/Mit-47 Improvement of Kewarjure UP Office to Kazir khala Feri ghat Road (ch.3490-4240m); 0.7500 37.177 LCS; 2 nos groups 37.177 02/02/2016 100 19/01/2019 Community Road
7 HILIP/14/WD15 /VR-KIS/Mit-30 Improvement of Kulkulir Khal to Noabad Road (Ch.1760-2760m); 1.0000 49.570 LCS; 3 nos groups 49.570 16/11/2015 100 19/01/2019 Community Road
8 HILIP/15/WD3/UNR-KIS /Mit-17 Part-A) Improvement of Dhaki UP Office - Katkhal UP Office Road (ch. 4000 – 7860m); 3.8600 270.200 M/S Nishat Trading Company, Kishoreganj 270.200 05/11/2017 50 19/01/2019 Union Road
9 HILIP/15/WD5/UNR-KIS /Mit-15 Improvement of Dhaki UP Office - Katkhal UP Office Road (ch. 2000 – 4000m) with 4 nos U-Drain (size: 0.625m x 0.60m ) at ch. 2580m, 3050m, 3550m & 3860m; 2.0000 140.000 M/S. Bhati Bangla Enterprise, Ukilpara, Kishorgonj. 140.000 09/03/2017 100 19/01/2019 Union Road
10 HILIP/14/WD5/UNR-KIS/Mit-16 Improvement of Dhaki UP Office - Katkhal UP Office Road (ch. 00-2000m) with 8 nos U-drain at ch.110m, 440m, 580m, 970m,1230m,1430m,1690m & 1880m; 2.0000 140.000 M/S Nishat Trading Company, 9 New Eskaton, Dhaka-1000 140.000 28/07/2016 100 19/01/2019 Union Road
11 HILIP/13/WD5/KIS-6 Improvement of Gopedighi UP Office - Baghadia bazar Road (Ch. 4000-5174m); 1.1740 82.180 M/S Shahil Enterprise, Station Road, Kishoreganj 82.180 30/12/2014 100 19/01/2019 Union Road
12 HILIP/KIS/UNR-006 Improvement of Gopedighi UP Office - Baghadia Bazar Road (Ch.2774-4000m); 1.2260 85.820 M/S Al-Gilani Construction, Motijheel, Dhaka. 85.820 20/03/2014 100 19/01/2019 Union Road
13 HILIP/KIS/UNR-005 Improvement of Gopedighi UP Office - Baghadia bazar Road (Ch.1774-2774m); 1.0000 70.000 M/S Bhati Bangla Enterprise, Ukilpara, Kishoreganj. 70.000 01/04/2014 100 19/01/2019 Union Road
14 HILIP/KIS/UNR-004 Improvement of Gopedighi UP Office - Baghadia Bazar Road (Ch.774-1774m); 1.0000 70.000 M/S Shiplo Traders, Rathkola, Kishoreganj 70.000 03/04/2014 100 19/01/2019 Union Road
4 Nikli
1 HILIP/16/WD4/VR-KIS/Nik-23 Improvement of Dampara Bazar - Aliapara Road (ch. 3050 -5850m) with 3 Nos U-Drain (Size: 0.60mx.0.625m) at ch. 5240m, 4530m & 5760m; 2.8000 138.796 LCS; 10 nos groups 138.796 30/11/2018 70 19/01/2019 Community Road
2 HILIP/16/WD4/VR-KIS/Nik-22 Part-A) Improvement of Singpur to Vtivoratiya Road (Ch.3100 - 5100m) with 6 Nos U-drain (Size:0.60mx0.625m) at ch. 3250m, 3720m, 4330m, 4650m, 4760m, & 5040m; Part-B) Improvement of Singpur to Vtivoratiya Road (Ch.5100 -7150m) with 3 Nos U-drain (Size:0.60mx0.625m) at ch. 5330m, 5850m, 6580m & 6900m; 2.0000 99.140 LCS; 7 nos groups 99.140 27/04/2018 100 19/01/2019 Community Road
3 HILIP/15/WD15 /VR-KIS/Nikli-13 Improvement of H/O Iman Ad - Nikli Bazar Road (Ch. 510-810m). Effective Length = 300 m ; 0.3000 14.871 LCS; 1 no group 14.871 23/08/2016 100 19/01/2019 Community Road
4 HILIP/15/WD15 /VR-KIS/Nikli-10 Improvement of Sajanpur FWC to Boiddarkanda Road (Ch 2000-4150m); 2.1500 106.575 LCS; 7 nos groups 106.575 23/05/2017 100 19/01/2019 Community Road
5 HILIP/15/WD15 /VR-KIS/Nikli-09 Improvement of Singpur -Vatioratia Pajghat Road (Ch 00-3100m); 3.1000 153.667 LCS; 9 nos groups 153.667 15/04/2017 100 19/01/2019 Community Road
6 HILIP/15/WD15 /VR-KIS/Nikli-08 Improvement of Karpasa UP- Jalalpur Bazar Road (Ch 2000-2500m); 0.5000 24.785 LCS; 2 nos groups 24.785 03/02/2017 100 19/01/2019 Community Road
7 HILIP/15/WD15 /VR-KIS/Nikli-07 Improvement of Dampara Bazar Ali para Road (Ch 2000-3050m); 1.0500 52.048 LCS; 3 nos groups 52.048 04/02/2017 100 19/01/2019 Community Road
8 HILIP/14/WD15 /VR-KIS/Nikli-43 Improvement of Karpasa UP -Jalalpur Bazar Road(Ch.0-2000m); 2.0000 99.140 LCS; 6 nos groups 99.140 28/02/2017 100 19/01/2019 Community Road
9 HILIP/14/WD15 /VR-KIS/Nikli-42 Improvement of Sajanpur FWC to Boiddarkanda Road (Ch. 0-2000m); 1.9590 97.107 LCS; 7 nos groups 97.107 15/01/2017 100 19/01/2019 Community Road
10 HILIP/14/WD15 /VR-KIS/Nikli-39 Improvement of Doulatpur - parabazitpur Road (Ch. 0-2500m); 2.5000 123.925 LCS; 8 nos groups 123.925 30/11/2015 100 19/01/2019 Community Road
11 HILIP/14/WD15 /VR-KIS/Nikli-38 Improvement of Dampara Bazar Ali para Road (Ch 0-2000m); 1.9400 96.165 LCS; 7 nos groups 96.165 15/01/2017 100 19/01/2019 Community Road
12 HILIP/13/WD15/ KIS-14 Improvement of Chatir Char-Sapmari Road (Ch. 108-2608m); 2.5000 123.925 LCS; 16 nos groups 123.925 15/03/2015 100 19/01/2019 Community Road
13 HILIP/KIS/COM-003 Improvement of H/O Iman Ad - Nikli Bazar Road (Ch. 00-845m). Effective Length = 510.00m; 0.5100 25.280 LCS; 6 nos groups 25.280 30/09/2014 100 19/01/2019 Community Road
14 HILIP/14/WD4/UZR-Kis/Nikli-10 Improvement of Nikli Bazar - Singpur Bazar Road (ch.2635-2775m, 2900-3765m & 6465-7575m); 2.1150 169.200 M/S Shahil Enterprise, Station Road, Kishoreganj 169.200 15/07/2016 100 19/01/2019 Upazila Road
Total : 134.3410 (Km) 9030.07 (Lac) 9030.07 (Lac)