Loading...

Project Scheme Detail List
SL No. Package No. Name Length (Km) Allotment (Lac) Name of Contractor Contract Amount (Lac) Date of Commencement Date of Completion Physical Progress (%) Date of Progress Update Remarks
1 Madaripur-s
1 MGSP/MAD/2015-16/W-03 (a) Improvement of (BISIC road) Bachchu Sarak to main road (Ch.0+00 to 0+862m) by BC Pavement. (b) Improvement of (BISIC road) Bachchu Sarak to main road by RCC Pavement (Ch.0+00 to 0+208m) by BC (bypus road) (c ) Construction of RCC Drain start from Shahid Bachchu Sarak (BISIC road side drain) (R/S) with foothpath Ch. 0+000 to 0+867m under Madaripur Pourashava. (d) Environmental work on road and drain at Bisic road starting from Bachchu Sarak to main road (Ch. 0+000m to 0+862m) under Madaripur Pourashava, Madaripur. Fixed cost-01 (e) Environmental work on road and drain at Bisic road starting from Bachchu Sarak to main road (Ch. 0+000m to 0+862m) under Madaripur Pourashava, Madaripur. Fixed cost-02 1.9370 35397555.710 M.A.H. Construction Ltd. 35397555.710 06/11/2016 05/11/2017 41 27/09/2017  
2 MGSP/MAD/W-02 a) Construction of RCC Road at Shahid Harun Sarak Starting from Madaripur Main Road to Dorgha Sharif Road. (Ch. 0.00-365.00m) (Total Length: 365m) b) Construction of RCC Road at Pakdi Peshker Bari road starting from Charmuguria Puraton road to Beri badh (Ch0.00m to 280.00m) (Total Length: 280m) c) Construction of RCC Road at Bankers Colony starting from Madaripur Shariatpur road to Posu Hospital (Ch. 0.00-465.00m) (Total Length: 465m) d) Construction of Drain at Bankers Colony starting from Madaripur Shariatpur road to Posu Hospital (Ch. 4.00-465.00m) (Total Length: 461m) e) Construction of RCC Road at L. Faruk Sarak starting from RHD Road to End of Poura Area. (Ch. 0.00-270.00m) (Total Length: 270m) f) Construction of RCC Road starting from Badamtola Hamid Akind Srak to U.I School (Ch. 0.00-270.00m) (Total Length: 270m) g) Construction of Drain starting from Badamtola Hamid Akind Srak to U.I School (Ch. 0.00-270.00m) (Total Length: 270m) h) Construction of RCC Road at the Nasim Nagar Charity Hospital road starting from Charmuguria Main road to Grave Yard road (Ch. 0.00-290.00m) (Total Length: 290m) i) Construction of drain at the Nasim Nagar Charity Hospital road starting from Charmuguria Main road to Grave Yard road (Ch. 0.00-290.00m) (Total Length: 290m) 2.9610 26222469.000 M/S Atahar EnterPrise 26222469.000 05/02/2015 17/04/2016 100 27/09/2017 Completed
3 MGSP/MAD/W-01 a) Construction of RCC Road at Shahid Bachu Sarak Starting from Kazir More to Howlader Godi. (Ch. 1230.00-1572.00m) (Total Length: 342m) b) Construction of Drain (Both side) at Shahid Bachu Sarak Starting from Kazir More to Howlader Godi. (Ch. 1230.00-1572.00m) (Total Length: 684m) c) Construction of RCC Road at Uttoron Club Road (Ch.000-90.00m) (Total Length: 90m) d) Construction of Drain at Uttoron Club Road (Both side) (Ch.000-90.00m) (Total Length: 180m) e) Construction of RCC road at Amin Uddin Howlader Sarak. (Ch. 0.00-430.00) (Total Length: 430m) f) Construction of Drain at Amin Uddin Howlader Sarak. (Ch. 0.00-430.00) (Total Length: 430m) g) Construction of RCC Road at Sardar Colony Hamid Sikder Sarak Starting from Hamid Akond Sarak. to RHD main Road (Ch. 0.00-420.00m) (Total Length: 420m) h) Construction of of Drain at Sardar Colony Hamid Sikder Sarak Starting from Hamid Akond Sarak. to RHD main Road (Ch. 0.00-420.00m) (Total Length: 253m) 2.9960 28598735.000 Md. Kabir Hossain 28598735.000 05/02/2015 30/07/2016 100 27/09/2017 Completed
Total : 7.8940 (Km) 90218759.71 (Lac) 90218759.71 (Lac)