1
|
MGSP/SHA/W-01
|
a) Construction of RCC road starting from Pourashava BC road to (house of Mr.Onu Chaudhary) to house of Mojid Chairman via Sadar Hospital via house of Salma Councilor (Ch.0.00-270) (Total Length: 270.00m)
b) Construction of carpeting road from starting from RHD Road brside BWDB Office to Nilkandi via RHD road to house of Mr.Opu Ghos.(Ch. 0.00.-1980m) (Total Length: 1980m)
c) Construction of Box Culvert (2.50m*2.50mm) at Ch.1282m on of carpeting road from starting from RHD Road beside BWDB Office to Nilkandi via RHD road to house of Mr.Opu Ghos.(Ch. 0.00.-1980m)
d) Construction of Box Culvert (3.50m*3.50mm) at Ch.1743m on Carpeting road starting from RHD Road beside BWDB Office to Nilkandi via RHD road to house of Mr.Opu Ghos.(Ch. 0.00.-1980m)
e) Construction of Carpeting road starting from Police Line RHD to house of Mr.Siddik Munshi via Shariatpur Stadium via house of Mr.Abdul Hai Sikder (Ch.0.00-982m) (Total Length: 982m)
f) Construction of Carpeting road starting from RHD road beside BRAC Office to RHD road beside Billal Sader via H/O Iman Khan (Ch.0.00-620m) (Total Length: 620m)
g) Improvement of BC road Police Box at DC Office to Ansar VDP Barak (Uttar Bazar Mosque) via Paccar Matha, Bot-tala and Pubali Bank (Ch. 0.00-1800m) (Total Length: 1800m)
|
7.6320
|
50832749.000
|
M/S Waliur Rahman & KSA (JV)
|
50832749.000
|
03/06/2015
|
25/05/2016
|
100
|
27/09/2017
|
Completed
|