1
|
MGSP/SHE/2015-16/W-03
|
(a)Construction of RCC Drain starting from Ulipur to National highway ( Sherpur Hospital Road) via Darkipara Ch.0+000-2+715 under Sherpur Pourashava, Bogra
(b) Supplying, fitting and fixing of street light in road side from Ulipur to National highway ( Sherpur Hospital Road) via Darkipara Ch.0+000-2+715 under Sherpur Pourashava, Bogra
|
5.4300
|
114268901.080
|
MS Appollo Engineering & Construction Ltd.
|
114268901.080
|
29/09/2016
|
29/09/2017
|
5
|
27/09/2017
|
|
2
|
MGSP/SHE/W-02
|
a) Construction of BC Road at Dhunat road Doctor Clinic to Hazipur Highway road vai Sherpur Thana (Ch. 0.00-2600m) under Sherpur Pourashava. Total length = 2600m
b) Construction of BC Road start from College road to near house of Hamed via near house of Razu Profficer (Ch. 0.00-370m & Link 130.0) In Ward no. 06 under Sherpur Pourashava. Total length = 500m
c) Construction of RCC drain start from National Highway (Alamgir shop) to near Sarkar shop via Poura shishu park under Sherpur Pourashava (ch.0.00-760m) Total length=760m
d) Construction of BC Road start from National Highway (Alamgir shop) to near house of Dinu Babu in Ward no-05 under Sherpur Pourashava (ch.0.00-90.0m) Total length=90m
e) Construction of BC Road start from (National Highway Dhaka-Bogra) to Near Dalal office in Ward no-07 (ch.0.00-320.0m) under Sherpur Pourashava Total length=320m
|
4.2700
|
32597048.000
|
M/S. Ataur Rahman Khan
|
32597048.000
|
20/08/2015
|
15/08/2016
|
100
|
27/09/2017
|
Completed
|
3
|
MGSP/SHE/W-01
|
a) Construction of BC Road start from National Highway (Pals Clinic) to near house of Nowsher via Mottri NGO office (ch.0.00-370m & Link 130.0) in Word no-09, under Sherpur Pourashava,. Total length=500m
b) Construction of RCC drain start from National Highway (Pals Clinic) road to Baroduary poura mosque via Katcha Bazar under Sherpur Pourashava (ch.0.00-520m), Total length=520m.
c) Construction of RCC Drain start from near Uttara Plaza to Korotoa river via AC-Land Office under Sherpur Pourashava (Ch. 0.00-630m). Total length = 630m
d) Construction of BC Road at Darkipara Existing BC road to Hazipur (Highway road) via Nayapara (ch.0.00-1600m), under Sherpur Pourashava. Total length =1600m.
|
3.2500
|
31526275.000
|
M/S MTE & MMRM JOINT VENTURE
|
31526275.000
|
20/08/2015
|
15/08/2016
|
100
|
27/09/2017
|
Completed
|