SL No.
|
Package No.
|
Name
|
Length (Km)
|
Allotment (Lac)
|
Name of Contractor
|
Contract Amount (Lac)
|
Date of Commencement
|
Date of Completion
|
Physical Progress (%)
|
Date of Progress Update
|
Remarks
|
1
|
Bakshiganj
|
1
|
WNOBI-JAM(BAK)-UZRU-01
|
Improvement of Dotterchar R&H Sarmara GC Road at ch. 0+000 to 6+350 Km. under Bakshiganj Upazila, District: Jamalpur.Road ID. 339072008
|
6.3500
|
591.874
|
Taher & Sons (Pvt.) Ltd., 55 West Panthapath, Sheltech Tower (7th Floor). Dhaka-1205.
|
591.874
|
07/06/2015
|
18/02/2017
|
100
|
12/07/2020
|
|
|
2
|
Dewanganj
|
1
|
WNOBI-DEWAN(JAMAL)-PIII(3)
|
a)Improvement of 72m RCC road at Junction area of Beltoli more bazar, Dewanganj Pourashava, Jamalpur.
b)Improvement of foothpath for Junction, length = 345m and foothpath with drain, length = 106m at Beltoli more bazar, Dewanganj Pourashava, Jamalpur.c)Im
|
|
132.931
|
M/S Lokman Hossain, Choybari, Brahmanbaria.
|
132.931
|
22/10/2018
|
28/11/2019
|
92
|
12/07/2020
|
Pourashava Infrastructure
|
2
|
WNOBI-DEWAN(JAMAL)-P/III(1)
|
(a) Improvement of Road From Beltoli Bazar to Dewanganj Bazar via Charkalikapur Rofiq Doctors House (0+00 to 2+590 km) [Road ID No. SR-339157018]
(b) Improvement of Road Start from Dewanganj A.K.M College to Pumptola Rail Gate (Road) (0+00 to 0+950 km) [
|
4.0900
|
307.629
|
Akram Enterprise, Nawhata, Sherpur Sadar, Dist: Sherpur.
|
307.629
|
22/10/2018
|
30/11/2019
|
98
|
12/07/2020
|
Pourashava Infrastructure
|
3
|
WNOBI-DEWAN(JAMAL)-P/III(2)
|
a)Suppying Rickshaw Van, b)Garbage Pit,c)Improvement of Tubewell for toilet depth-100m (nos. 02) at Rishipara slum area.d)Improvement of Twin Cabin toilet (nos. 02) at Rishipara slum area.e)Suppying Sewing Machine
f)Improvement of 1m Width RCC road at Ris
|
|
224.540
|
M/S Lokman Hossain, Choybari, Brahmanbaria.
|
224.540
|
23/10/2018
|
28/11/2019
|
100
|
12/07/2020
|
Pourashava Infrastructure
|
4
|
WNOBI-DEWAN(JAM)-P/III(4)
|
a) Improvement of road start from pumpotola rail crossoing to Beltoli bazar gatepara via Dewanganj rail station. Ch. 0+000 to 0+833km & link Ch. 0+000 to 0+035km ID No. LR-127388017 (PDP)
b) Development of Passenger shed (No.-1) at Dewanganj bus terminal,
|
|
105.431
|
M/S Lokman Hossain, Choybaria, Brahmanbaria.
|
105.431
|
|
28/11/2019
|
100
|
12/07/2020
|
Pourashava Infrastructure
|
5
|
WNOBI-DEWAN(JAMAL)-P/II(2)
|
(A) Construction of the Drain from Rampura More to old Brahmaputra River via Kamil Madrasha (410m), (SDR-339157004) (B) Construction of the Drain from Chikajani Chowrasta (AKM College) to Gohati (175m) (SDR-339157009)
|
585.0000
|
83.260
|
M/S LOKMAN HOSSAIN, Schaibaria, Brahmanbaria
|
83.260
|
09/10/2017
|
30/09/2019
|
100
|
12/07/2020
|
Pourashava Infrastructure
|
6
|
WNOBI-DEWAN(JAMAL)-P/1(1)
|
A) Improvement of Chikajani House of Nazimuddin Master -Pourashava End Point road (RCC Road) Ch 0+000km to 0+480 Km (ID-LR-339158101) B) Rehabilitation of Jambil Bazar - House of Sultan Mia Road Ch 0+000Km -0+554 Km (ID-PR-339156002) C) Improvement
|
3.3750
|
206.584
|
M/S. Mozahar Enterprise, 260 Rail Road, Dashpara Moar,Basabati, Bagerhat
|
206.584
|
03/05/2015
|
13/12/2016
|
100
|
12/07/2020
|
Pourashava Infrastructure
|
7
|
WNOBI-DEWAN(JAMAL)-P/II(1)
|
Rehabilitation of Road by B.C to Beltoli Bazar to Mollah Para at Ch. 0+000km to Ch. 1+820km).(SR-339157021)
|
1.8200
|
117.511
|
M/S LOKMAN HOSSAIN, 987 No. Choybaria, Brahmanbaria
|
117.511
|
24/09/2017
|
19/09/2018
|
100
|
12/07/2020
|
Pourashava Infrastructure
|
8
|
WNOBI-DEWAN(JAMAL)-P/III(5)
|
(a) Construction of RCC road from Animal hospital more to Kacharicipal Mosque(road). Ch:0+000 to 0+250 km. Road ID No: LR-339158107.
(b) Construction of RCC drain from Pourashava gate to connect existing drain near H/O Ehsan Shah.Ch:0+000 to 0+200 km. Roa
|
450.0000
|
63.471
|
M/S Lokman Hossain, Choybaria, Brahmanbaria.
|
63.471
|
|
15/10/2019
|
100
|
12/07/2020
|
Pourashava Infrastructure
|
|
3
|
Islampur
|
1
|
WNOBI-JAM(ISLAM)-UZRR-GOB-33
|
Rehabilitation of Islampur HQ-Mahmudpur GC via Pachabahala GC road Ch: 0+000km to 7+600km under Islampur Upazila, District: Jamalpur. (Road ID-339292004)
|
7.6000
|
840.971
|
Mohammed Eunus & Brothers (Pvt).
|
840.971
|
|
20/10/2020
|
11
|
12/07/2020
|
|
2
|
WNOBI/JAM/GC/107(B)
|
Development of Dharmakura Bazar Growth Center Market at Upazila: Islampur, District:Jamalpur
|
|
166.853
|
M/S Kundu Trades, Gopalpur, Tangail.
|
166.853
|
04/08/2016
|
30/04/2018
|
100
|
12/07/2020
|
|
3
|
WNOBI/JAM/GC/107(A)
|
Development of Guthail Bazar Growth Center Market at Upazila:Islampur, District:Jamalpur
|
|
157.345
|
Islam Brothers, 7 Court Road, Jhalakathi.
|
157.345
|
28/07/2016
|
31/01/2018
|
100
|
12/07/2020
|
|
4
|
WNOBI-JAM(IS)-UNRU-109-B
|
Construction of 30m Long RCC Girder Bridge on Char Goalini UP to Porarchar Bazar via Kandarchar Bazar road at Ch.3+665km Under Islampur Upazila, District: Jamalpur.
(Road ID No. 339293001)
|
|
199.864
|
M/S Dhrod Trade Agency, Madhya Shery, Sherpur Toen, Sherpur.
|
199.864
|
08/08/2016
|
30/06/2018
|
100
|
12/07/2020
|
|
5
|
WNOBI-JAM(IS)-UNRU-109
|
Improvement of Char Goalini UP to Porarchar Bazar via Kandarchar Bazar Road. Ch. 0+000km to 7+080km. (Effective length 6.638km) Under Islampur Upazila, District: Jamalpur
(ID No. 3392930010
|
6.6400
|
617.255
|
MAE & DCL (JV), House No. 22, Road No. 12, Nikunja-2, Dhaka.
|
617.255
|
30/06/2016
|
30/09/2018
|
100
|
12/07/2020
|
|
6
|
WNOBI-JAM(IS)-UNRU-109
|
Improvement of Char Goalini UP to Porarchar Bazar via Kandarchar Bazar Road. Ch. 0+000km to 7+080km. (Effective length 6.638km) Under Islampur Upazila, District: Jamalpur
(ID No. 3392930010
|
6.6400
|
617.255
|
MAE & DCL (JV), House No. 22, Road No. 12, Nikunja-2, Dhaka.
|
617.255
|
30/06/2016
|
30/09/2018
|
100
|
12/07/2020
|
|
7
|
WNOBI-JAM(IS)-UNRU-109
|
Improvement of Char Goalini UP to Porarchar Bazar via Kandarchar Bazar Road. Ch. 0+000km to 7+080km. (Effective length 6.638km) Under Islampur Upazila, District: Jamalpur
(ID No. 3392930010
|
6.6400
|
617.255
|
MAE & DCL (JV), House No. 22, Road No. 12, Nikunja-2, Dhaka.
|
617.255
|
30/06/2016
|
30/09/2018
|
100
|
12/07/2020
|
|
8
|
WNOBI-JAM(IS)-UNRU-109
|
Improvement of Char Goalini UP to Porarchar Bazar via Kandarchar Bazar Road. Ch. 0+000km to 7+080km. (Effective length 6.638km) Under Islampur Upazila, District: Jamalpur
(ID No. 3392930010
|
6.6400
|
617.255
|
MAE & DCL (JV), House No. 22, Road No. 12, Nikunja-2, Dhaka.
|
617.255
|
30/06/2016
|
30/09/2018
|
100
|
12/07/2020
|
|
9
|
WNOBI-JAM(IS)-UNRU-109
|
Improvement of Char Goalini UP to Porarchar Bazar via Kandarchar Bazar Road. Ch. 0+000km to 7+080km. (Effective length 6.638km) Under Islampur Upazila, District: Jamalpur
(ID No. 3392930010
|
6.6400
|
617.255
|
MAE & DCL (JV), House No. 22, Road No. 12, Nikunja-2, Dhaka.
|
617.255
|
30/06/2016
|
30/09/2018
|
100
|
12/07/2020
|
|
10
|
WNOBI-JAM(IS)-UNRU-109
|
Improvement of Char Goalini UP to Porarchar Bazar via Kandarchar Bazar Road. Ch. 0+000km to 7+080km. (Effective length 6.638km) Under Islampur Upazila, District: Jamalpur
(ID No. 3392930010
|
6.6400
|
617.255
|
MAE & DCL (JV), House No. 22, Road No. 12, Nikunja-2, Dhaka.
|
617.255
|
30/06/2016
|
30/09/2018
|
100
|
12/07/2020
|
|
|
4
|
Jamalpur-s
|
1
|
WNOBI-JAM(SAD)-UNRU-110(A)
|
Improvement of Digpaith UP to Ram Krishnapur Bazar via Chanpur Bazar road. (ID-339363004) (Sontia GC to Bashchara GC Road, ID – 339362015) Ch. 0+000km to Ch. 8+600Km under Sadar Upazila, District: Jamalpur)
|
8.6000
|
704.992
|
MBE-MAE JV, Melandah Bazar, Melandah, Jamalpur.
|
704.992
|
28/10/2017
|
30/05/2019
|
90
|
12/07/2020
|
|
2
|
WNOBI-JAM(SAD)-UNRU-110(B)
|
Improvement of Digpaith UP to Ram Krishnapur Bazar via Chanpur Bazar road. (ID-339363004) (Sontia GC to Bashchara GC Road, ID – 339362015) Ch. 8+600km to Ch. 16+335Km under Sadar Upazila, District: Jamalpur)
|
7.7350
|
773.947
|
M/S Durga Enterprise, Madrasha Road, Dewangonj Bazar, Dewangonj, Jamalpur
|
773.947
|
25/10/2017
|
30/05/2019
|
100
|
12/07/2020
|
|
|
5
|
Madarganj
|
1
|
WNOBI-JAM(MA)-UZRU-04(A)-B
|
Construction of 98m Long RCC Girder Bridge on Rayaganj GC to Simla Bazar RHD via Royerchara Bazar Road (Madarganj Part) over Jenai river. Ch.1+095km Under Madarganj Upazila, District: Jamalpur
(Road ID NO. 339582009)
|
|
406.252
|
MCE-MBE(JV), Melandha, Jamalpur.
|
406.252
|
11/09/2016
|
30/06/2019
|
100
|
12/07/2020
|
|
2
|
WNOBI-JAM(MA)-UZRU-04(A)
|
Improvement of Rayaganj GC-Simla Bazar RHD Road via Royerchara Bazar Road (Madarganj Part) at Ch. 0+000km.- 4+900km. under Madarganj Upazila, District: Jamalpur.
(ID No. 339582009)
|
4.9000
|
654.078
|
SEL-MMC JV, Medical Road, Jamalpur
|
654.078
|
23/11/2015
|
30/06/2017
|
100
|
12/07/2020
|
|
3
|
WNOBI-JAM(MA)-UZRU-04(A)
|
Improvement of Rayaganj GC-Simla Bazar RHD Road via Royerchara Bazar Road (Madarganj Part) at Ch. 0+000km.- 4+900km. under Madarganj Upazila, District: Jamalpur.
(ID No. 339582009)
|
4.9000
|
654.078
|
SEL-MMC JV, Medical Road, Jamalpur
|
654.078
|
23/11/2015
|
30/06/2017
|
100
|
12/07/2020
|
|
4
|
WNOBI-JAM(MA)-UZRU-04(A)
|
Improvement of Rayaganj GC-Simla Bazar RHD Road via Royerchara Bazar Road (Madarganj Part) at Ch. 0+000km.- 4+900km. under Madarganj Upazila, District: Jamalpur.
(ID No. 339582009)
|
4.9000
|
654.078
|
SEL-MMC JV, Medical Road, Jamalpur
|
654.078
|
23/11/2015
|
30/06/2017
|
100
|
12/07/2020
|
|
5
|
WNOBI-JAM(MA)-UZRU-04(A)
|
Improvement of Rayaganj GC-Simla Bazar RHD Road via Royerchara Bazar Road (Madarganj Part) at Ch. 0+000km.- 4+900km. under Madarganj Upazila, District: Jamalpur.
(ID No. 339582009)
|
4.9000
|
654.078
|
SEL-MMC JV, Medical Road, Jamalpur
|
654.078
|
23/11/2015
|
30/06/2017
|
100
|
12/07/2020
|
|
6
|
WNOBI-JAM(MA)-UZRU-04(A)
|
Improvement of Rayaganj GC-Simla Bazar RHD Road via Royerchara Bazar Road (Madarganj Part) at Ch. 0+000km.- 4+900km. under Madarganj Upazila, District: Jamalpur.
(ID No. 339582009)
|
4.9000
|
654.078
|
SEL-MMC JV, Medical Road, Jamalpur
|
654.078
|
23/11/2015
|
30/06/2017
|
100
|
12/07/2020
|
|
7
|
WNOBI-JAM(MA)-UZRU-04(A)
|
Improvement of Rayaganj GC-Simla Bazar RHD Road via Royerchara Bazar Road (Madarganj Part) at Ch. 0+000km.- 4+900km. under Madarganj Upazila, District: Jamalpur.
(ID No. 339582009)
|
4.9000
|
654.078
|
SEL-MMC JV, Medical Road, Jamalpur
|
654.078
|
23/11/2015
|
30/06/2017
|
100
|
12/07/2020
|
|
|
6
|
Melendah
|
1
|
WNOBI-MELAN(JAMAL)-P/II(2)
|
Providing of Solid Waste Collection-Van and Community Toilets in Slum Areas in Melendah Pourashava.
|
9.0000
|
22.524
|
M/S MINAN ENTERPRISE,Melandah, Jamalpur
|
22.524
|
|
18/10/2017
|
100
|
12/07/2020
|
Pourashava Infrastructure
|
2
|
WNOBI-MELAN(JAMAL)-P/III(2)
|
Improvement of 4 Slum Area, (Uttar Adipoit Baparipara, Chakdhah Guchhagram, Chakdhah Shadarbari-1, 2, Ghutkapara), Under Melandah Pourashava, District: Jamalpur.
|
4.0000
|
273.725
|
Mohammed Eunus & Brothers(Pvt) Ltd. A.S Tower (8th Floor), Road No-01, Plot No-553, Hill View, Panchlaish, Chittagang.
|
273.725
|
|
31/12/2019
|
100
|
12/07/2020
|
Pourashava Infrastructure
|
3
|
WNOBI-MELAN(JAMAL)-P/II(1)
|
A) Rehabilitation of Sahajadpur RHD to Shop of Asir via BADC Godown Road, (Ch. 0+000 km to Ch. 0+900km), (Road ID-LR-339618018)
B) Rehabilitation of Malikdanga Mufti Madrasha to Jamalpur RHD via Baroipara Road, (Ch. 0+000km to Ch. 2+519km), (Road ID-SR-33
|
5.4900
|
305.813
|
M/S. S.R.S. CONSTRUCTION, Tomaltola Road, Jamalpur.
|
305.813
|
01/01/2017
|
15/09/2018
|
100
|
12/07/2020
|
Pourashava Infrastructure
|
4
|
WNOBI-MELAN(JAMAL)-P/III(3)
|
a) Improvement of RCC road from Natushah mour to Bokul Commander house, Ch. 0+000 to 0+300 km. ID. SR-339617013
b) Improvement of Slaughter house & Office room at Melandah Pourashava, Jamalpur.
|
|
99.598
|
S. Ananta Bikash Tripura, Milonpur, 262, Golabari, Khagrachhari.
|
99.598
|
02/08/2018
|
31/12/2019
|
100
|
12/07/2020
|
Pourashava Infrastructure
|
5
|
WNOBI-MELAN(JAMAL)-P/III(5)
|
Installation of Street Light on Chakdoh Bottala more to Noya Nagar RHD road at Melandah Pourashava, District: Jamalpur.
|
|
22.022
|
M/S. Dhrob Trade Agency, Moddhoshery, Sherpur.
|
22.022
|
|
|
0
|
12/07/2020
|
Pourashava Infrastructure
|
6
|
WNOBI-MELAN(JAMAL)-P/1(1)
|
(A) Rehabilitation of Melandah Bazar nutu Sahar More – Dewangonj RHD via Baghar Itvata road. ( Ch 0+000Km -2+104Km) ID-SR -339617010, (B) Rehabilitation of Nayanagar RHD – House of Lal Mastar road. (Ch 0+000Km-0+995 Km) ID- LR -339618001 (C)Reha
|
4.7160
|
226.286
|
M/S. Bhawal Construction, 40 Sehra Chamra Goodam, Mymensingh.
|
226.286
|
30/04/2015
|
01/08/2016
|
100
|
12/07/2020
|
Pourashava Infrastructure
|
7
|
WNOBI-MELAN(JAMAL)-P/III(1)
|
a)Improvement of road from Bottala morr to Valuka road end Pourashava (Ch. 0+000 to 1+125km). ID: SR-339617004.
b)Improvement of road from Kazipara morr to Bottala morr (Ch. 0+000 to 0+180km). ID: PA-339617001.
c)Improvement of road from Chakodh Bottala m
|
5.5150
|
340.025
|
Mohammed Eunus & Brothers (Pvt.) Ltd. A.S. Tower (8th Floor) Road No-01, Plot No-553, Hill View, Panchlaish, Chittagang.
|
340.025
|
|
29/02/2020
|
100
|
12/07/2020
|
Pourashava Infrastructure
|
8
|
WNOBI-MELAN(JAM)-P/III(4)
|
a) Construction of RCC Road from Nangla Union Porishad to Kandepbari more under Melandah Pourashava. Ch. 0+000-0+425km. ID. No. SR-339617014.
b) Construction of RCC Road from Rupali Bank to Thana more. Ch. 0+000-0+125km. ID. No. SR-339617050.
|
|
79.257
|
M/S. Dhrob Trade Agency, Pro: Syed Ariful Islam, Moddho Shawari, Sherpur Sadar, Sherpur.
|
79.257
|
25/03/2019
|
15/01/2020
|
100
|
12/07/2020
|
Pourashava Infrastructure
|
9
|
WNOBI-JAM-RM-130(C)
|
Development of Beltail Bazar, Rural Market At Upazila: Melendah, District: Jamalpur.
|
|
90.311
|
M/S Akram Enterprise, Khorapara, Sherpur.
|
90.311
|
03/07/2016
|
13/09/2017
|
100
|
12/07/2020
|
|
10
|
WNOBI/JAM/GC/107(C)
|
Development of Hazrabari Growth Center Market At Upazila :Melandah, District: Jamalpur
|
|
124.574
|
M/S Laboni Enterprise, Madarganj.
|
124.574
|
06/08/2016
|
05/08/2017
|
100
|
12/07/2020
|
|
11
|
WNOBI-JAM(MEL)-UNRU-114
|
Improvement of Melandah Rail station-Shihata via Nayanagar UP Road. Ch. 0+000km to Ch. 5+545km (ID: 339613003)
|
5.5450
|
499.622
|
Dolly Construction Ltd-Infratech (JV), Sena Kalyan Bhaban, 195 Mothijheel C/A, Suit # 1602, Dhaka-1000
|
499.622
|
22/01/2018
|
31/03/2020
|
85
|
12/07/2020
|
|
12
|
WNOBI-JAM(ME)-UZRU-02(B)
|
Improvement of Tonkey GC to Durmut GC (Shundara fasal) Road. Ch. 0+000 to 2+050 Km. under Melandha Upazila, District: Jamalpur. (ID No. 339612010)
|
2.0500
|
170.693
|
MST-MUC JV, Sarishabari, Boro Bazar, Sarishabari, Jamalpur.
|
170.693
|
20/07/2015
|
14/12/2016
|
100
|
12/07/2020
|
|
|
7
|
Sarishabari
|
1
|
WNOBI/JAM/GC/107(D)
|
Development of Aram Nagar Hat Growth Center Market At Upazila: Sarishabari, District: Jamalpur
|
|
128.593
|
M/S Alamgir Enterprise K.B. Ismail Road, Sadar, Mymensingh.
|
128.593
|
07/09/2016
|
31/03/2018
|
100
|
12/07/2020
|
|
2
|
WNOBI-JAM(SAR)-UZRU-04(B)-B
|
Construction of 24m Long RCC Girder Bridge on Simla Bazar RHD to Rayagonj GC road via Borobaria road over Digripasha Khal at Ch.3+425km Under Sarishabari Upazila, District: Jamalpur. (ID No. 339852009)
|
|
204.371
|
Bilkis Enterprise, Melamdah, Jamalpur.
|
204.371
|
30/07/2016
|
15/01/2019
|
100
|
12/07/2020
|
|
3
|
WNOBI-JAM(SAR)-UZRU-04(B)
|
Improvement of Shimla Bazar (RHD)- Raygonj GC Road via Borobaria at Ch. 0+000km.- 5+108km under Sarishabari Upazila, District: Jamalpur. (ID No. 339852009)
|
5.1080
|
558.577
|
M/S. Mitu tenders & Akram enterprise (JV), Baro Bazar, Sharishabari, Jamalpur
|
558.577
|
29/11/2015
|
30/06/2017
|
100
|
12/07/2020
|
|
4
|
WNOBI-JAM(SAR)-UZRU-04(B)
|
Improvement of Shimla Bazar (RHD)- Raygonj GC Road via Borobaria at Ch. 0+000km.- 5+108km under Sarishabari Upazila, District: Jamalpur. (ID No. 339852009)
|
5.1080
|
558.577
|
M/S. Mitu tenders & Akram enterprise (JV), Baro Bazar, Sharishabari, Jamalpur
|
558.577
|
29/11/2015
|
30/06/2017
|
100
|
12/07/2020
|
|
5
|
WNOBI-JAM(SAR)-UZRU-04(B)
|
Improvement of Shimla Bazar (RHD)- Raygonj GC Road via Borobaria at Ch. 0+000km.- 5+108km under Sarishabari Upazila, District: Jamalpur. (ID No. 339852009)
|
5.1080
|
558.577
|
M/S. Mitu tenders & Akram enterprise (JV), Baro Bazar, Sharishabari, Jamalpur
|
558.577
|
29/11/2015
|
30/06/2017
|
100
|
12/07/2020
|
|
6
|
WNOBI-JAM(SAR)-UZRU-04(B)
|
Improvement of Shimla Bazar (RHD)- Raygonj GC Road via Borobaria at Ch. 0+000km.- 5+108km under Sarishabari Upazila, District: Jamalpur. (ID No. 339852009)
|
5.1080
|
558.577
|
M/S. Mitu tenders & Akram enterprise (JV), Baro Bazar, Sharishabari, Jamalpur
|
558.577
|
29/11/2015
|
30/06/2017
|
100
|
12/07/2020
|
|
7
|
WNOBI-JAM(SAR)-UZRU-04(B)
|
Improvement of Shimla Bazar (RHD)- Raygonj GC Road via Borobaria at Ch. 0+000km.- 5+108km under Sarishabari Upazila, District: Jamalpur. (ID No. 339852009)
|
5.1080
|
558.577
|
M/S. Mitu tenders & Akram enterprise (JV), Baro Bazar, Sharishabari, Jamalpur
|
558.577
|
29/11/2015
|
30/06/2017
|
100
|
12/07/2020
|
|
8
|
WNOBI-JAM(SAR)-UZRU-04(B)
|
Improvement of Shimla Bazar (RHD)- Raygonj GC Road via Borobaria at Ch. 0+000km.- 5+108km under Sarishabari Upazila, District: Jamalpur. (ID No. 339852009)
|
5.1080
|
558.577
|
M/S. Mitu tenders & Akram enterprise (JV), Baro Bazar, Sharishabari, Jamalpur
|
558.577
|
29/11/2015
|
30/06/2017
|
100
|
12/07/2020
|
|
9
|
WNOBI-JAM(SAR)-UZRU-72(A)
|
Improvement of Norpara RHD to Dowali – Kendua GC Road, (Sarishabari Part) Ch. 0+000 km - Ch. 10+000km Under Sarishabari Upazila, District: Jamalpur, (ID No. 339852006)
|
10.0000
|
877.288
|
Dolly Construction Ltd-Infratech (JV), Sena Kalyan Bhaban, 195 Mothijheel C/A, Suit # 1602, Dhaka-1000
|
877.288
|
22/01/2018
|
31/03/2020
|
90
|
12/07/2020
|
|
10
|
WNOBI-JAM(SAR)-UZRU-72(B)
|
Improvement of Norpara RHD to Dowail-Kendua GC Road (Sarishabari Part) at Ch. 10+000km to 17+794km under Sarishabari Upazila, District: Jamalpur. (ID No. 339852006)
|
7.7940
|
570.466
|
MBE-MMT[JV], Sarishabari Boro Bazar, Sarishabari, Jamalpur
|
570.466
|
13/01/2018
|
12/01/2019
|
100
|
12/07/2020
|
|
|
Total :
|
1228.5680 (Km)
|
20098.08 (Lac)
|
20098.08 (Lac)
|
|
|
|
|
|
|