1
|
GCC2-14
|
Installation of 3 Nos Production Tube wells,Pump house,Necessary electrical work with 10.00km distribution pipe line at Zone-2,4 5 respectively
|
|
1900.210
|
RFL Plastics Limited
|
1900.210
|
|
|
0
|
07/02/2019
|
NOA Issued
|
2
|
GCC2-13
|
Construction of drain along the side of Nowzour to Zirani Bazar (starting from Zitermour to west direction up to 6.75 Km). (Ch. 00+000 to 6+750)
|
6.7500
|
1664.382
|
Wahid Construction ltd
|
1664.382
|
26/02/2017
|
14/09/2018
|
0
|
07/02/2019
|
|
3
|
GCC2-11
|
Construction of RCC Drain along side of Khapara road lasr part (up to Tilargati road ) Ch. 1+375 to Ch-3+810
|
3.1850
|
643.764
|
MRC-MKH(JV)
|
643.764
|
26/02/2017
|
21/04/2018
|
0
|
07/02/2019
|
|
4
|
GCC2-07
|
Cosntruction of drain from Dhaka-Mymensingh highway to Dhaka bypass road via Gorib & Gorib factory & vogra bazar. (Ch. 00+00 to 1+400) b) Construction of drain from Mogorkhal to Kadda-Turag Khal along Dhaka By pass road Ch.0+0 to 3+950
|
5.1780
|
1500.765
|
MDJ Associates
|
1500.765
|
19/05/2017
|
25/06/2018
|
19
|
07/02/2019
|
|
5
|
GCC2-04
|
Construction of RCC Drain along side of Tongi Vadam road at Ch. 0+00 to Ch-4+125
|
5.2180
|
854.543
|
MRC-MKH(JV)
|
854.543
|
26/02/2017
|
21/04/2018
|
0
|
07/02/2019
|
|
6
|
GCC2-12
|
Repairing & Widening of BC road from Nowzour to Zirani Bazar (starting from Zitermour to west direction up to 6.75. Km). (Ch. 0+00 to 6+750)
|
6.7500
|
1210.074
|
NT-RA(JV)
|
1210.074
|
14/05/2017
|
30/11/2018
|
0
|
07/02/2019
|
|
7
|
GCC2-10
|
Repairing & widening of Khapara road (starting from Dhaka -Mymenshinhg road to Vadam road via Tilargati) (Ch-0+00 to Ch-3+810 ) By RCC Work
|
4.3600
|
1237.649
|
Wahid Construction ltd
|
1237.649
|
17/04/2017
|
22/12/2018
|
0
|
07/02/2019
|
|
8
|
GCC2-09
|
Repairing & Widening of BC road from Dhaka-Pubail road at Markun K2 factory to Harbaid Bazar via Maruka. (Ch. 0+00 to Ch-5+950)
|
5.9500
|
921.257
|
MAQ Engineering ltd.
|
921.257
|
30/03/2017
|
04/06/2018
|
0
|
07/02/2019
|
|
9
|
GCC2-08
|
Repairing & Widening of BC Road from Shibbari Moor to Zoorpukur & Repairing and Widening of Road from Zoorpukur Moor to Titarkul. (Ch.0+045 to 3+625) & Repairing and widening of BC road from Surabari Rice mill to Kashimpur-Sreepur Road Kazi Market Mr.Malek House via Shaildubi Member Market. Ward No (04 & 05).
|
6.7500
|
1105.015
|
NT-MMB(JV)
|
1105.015
|
31/01/2018
|
26/01/2019
|
0
|
07/02/2019
|
|
10
|
GCC2-06
|
Repairing & Widening of Joybangla road by RCC/BC (Barobari to Maghdubi bypass via Akkas marker) including a Link Road L=8280m
|
10.0300
|
1434.038
|
Wahid Construction ltd
|
1434.038
|
18/05/2017
|
23/01/2019
|
0
|
07/02/2019
|
|
11
|
GCC2-05
|
a) Repairing & Widening of BC Road from Kashimpur to Sreepur connecting road (UP to Mother Textile). (RCC Road Ch. 0+000-4+500)(Link-1 BC Road Ch.0+380-1+277.7) and 530m link-2 RCC road with side drain (Engineer bari road starting from Gacha polasona main road) b) Construction of RCC drain at Kashimpur to Sreepur connecting road (Zitermoor to Mother textile) (Ch.0+000 to 4+500) & Link (Ch.0+000-
|
11.8220
|
2337.088
|
MKE-CDC-NPIL Jv
|
2337.088
|
29/11/2017
|
23/11/2018
|
0
|
07/02/2019
|
|
12
|
GCC2-03
|
Repairing & widening of Tongi Vadam road by RCC work (Ch-1+651 to Ch-4+150 & Link-1 road by BC ch-0+100 to Ch-0+950 & Link-2 road by RCC Ch-0+625)
|
3.9740
|
993.775
|
MRC-MKH (JV )
|
993.775
|
17/04/2017
|
11/04/2018
|
0
|
07/02/2019
|
|
13
|
GCC2-02
|
a. Repairing & Widening of BC road from Maleker bari (Dhaka-Mymanshingh Highway) to Bashan sarak via Ojerpara & Haque Market. (Ch. 00+000 to 6+650 & a link Ch-0.0 to 0+763).
b. Construction of RCC drain along the side of Maleker bari raod (Dhaka-Mymanshingh Highway) to Bashan sarak via Ojerpara & Haque Market. (Ch.0.0 to -1+950),
|
12.7180
|
1972.084
|
CDC-NPL(JV)
|
1972.084
|
22/06/2017
|
28/08/2018
|
0
|
07/02/2019
|
|
14
|
GCC2-01
|
Repairing & Widening of Road by BC from Vanuya to Banomala rail crossing via Joydebpur-Dhirasram, Haydarabad. (Ch-0+00 to Ch-15+259)
|
15.2590
|
3335.920
|
RAB-RC(pvt) Ltd & Dawn Corporation(JV)
|
3335.920
|
16/11/2017
|
10/11/2018
|
0
|
07/02/2019
|
|