Project Scheme Detail List
SL No. Package No. Name Length (Km) Allotment (Lac) Name of Contractor Contract Amount (Lac) Date of Commencement Date of Completion Physical Progress (%) Date of Progress Update Remarks
1 Anwara
1 LGED/MDSP/CHI/15-16/W-01 Improvement of 130 nos existing disaster shelters 1705.180 MR-RT (JV) 1705.180 06/10/2017 30/06/2021 66 20/02/2021 Only one package for entire district. Improvement of 23 Shelters in Anowara, 20in Banshkhali, 2 in Boalkhali, 4 in Chandnaish, 6 in Fatikchhari, 4 in Hathazari, 4 in Lohagora, 14 in Mirsharai, 6 in Patiya, 4 in Rangunia, 4 in Satkania, 11 in Sitakunda and 28 in Sandwip upazila.
2 Banskhali
1 LGED/MDSP/CHI/14-15/NW-03A Construction of 25 nos GPS cum Disaster Shelters. 11927.810 Sarker Steel Ltd. 11927.810 29/03/2020 31/07/2021 10 20/02/2021 Only one package for entire district covering 5 Upazilas.Construction of 6 Shelters in Anowara, 8 in Banshkhali, 3 in Boalkhali,2 in Patiya and 6 in Sandwip upazila.
3 Mirsharai
1 LGED/MDSP/CHI/14-15/NW-03B Construction of 25 nos GPS cum Disaster Shelters. 10705.140 Sarker Steel Ltd. 10705.140 29/03/2020 31/07/2021 11 20/02/2021 Only one package for entire district covering 10 Upazilas.Construction of 2 Shelters in Chandnaish, 4 in Fatikchhari,2 in Hathazari, 2 in Lohagora, 5 in Mirsharai,2 in Rangunia,2 in Satkania,2 in Raozan upazila and 4 in Karnaphuli upazila.
4 Sandwip
1 LGED/MDSP/CHI/14-15/NW-10 Construction of 73 nos GPS cum Disaster Shelters with connecting Road 7.0800 32616.340 Wahid Construction Ltd. 32616.340 16/06/2020 31/12/2021 10 20/02/2021 Only one package for entire district covering 15 Upazilas.. Construction of 8 Shelters in Anowara, 9 in Banshkhali, 5 in Boalkhali, 2 in Chandnaish, 2 in Fatikchhari, 4 in Hathazari, 1 in Lohagora, 8 in Mirsharai, 6 in Patiya, 2 in Rangunia, 4 in Satkania, 6 in Sitakunda, 1 in Raozan and 15 in Sandwip upazila.
Total : 7.0800 (Km) 56954.47 (Lac) 56954.47 (Lac)