Project Scheme Detail List
SL No. Package No. Name Length (Km) Allotment (Lac) Name of Contractor Contract Amount (Lac) Date of Commencement Date of Completion Physical Progress (%) Date of Progress Update Remarks
1 Bagerhat-s
1 IRIDP-2/BGT/DW-121 Improvement of Khudra chaksree pry. School-C&B bazar via Gobinda mondir road ( Ch.00m-1250m).ID No. 201085123 1.2500 66.810 M/S. Mizan Enterprise 66.810 29/05/2018 60 20/05/2019
2 IRIDP-2/BGT/DW-120 Improvement of Rupsha Bagerhat R& H-Provach shel House-Rakhalgachi bazar via Molla bari road ( Ch.1440m-2550m).ID No. 201085208 1.1100 62.640 M/S. Mizan Enterprise 62.640 29/05/2018 45 20/05/2019
3 IRIDP-2/BGT/DW-44 Improvement of Khagra Ghat Primary School-Sarkardanga BWDB road (ch.00m-1000m). 1.0000 46.020 M/S. Sohel Construction 46.020 01/12/2016 0 20/05/2019
4 IRIDP-2/BGT/SMW-157 Maintenance of Bade Karapara Southpara Road (Ch.00-623m) 0.6230 8.620 M/S. Mijan Enterprise 8.620 10/10/2018 100 20/05/2019
5 IRIDP-2/BGT/SDW-131 Improvement of Koramara Moddapara Road (Ch.00m-271m).ID No. 201085322 0.2710 26.030 M/S. Alif Store 26.030 12/04/2018 100 20/05/2019
6 IRIDP-2/BGT/DW-124 Construction of 1No 3.0mx3.0m Culvert at Ch.808m on Madrasha bazar-Bisnupur via Fathapur GPS road. ID No. 201085278 9.570 M/S. Rahamat Traders 9.570 30/07/2018 100 20/05/2019
7 IRIDP-2/BGT/DW-123 Construction of 1No 3.0mx3.0m Culvert at Ch.800m on Sugandi Primary schol-Late Dr. Abu syed H/O road ID No. 201085076 9.570 M/S. Rahamat Traders 9.570 18/04/2018 100 20/05/2019
8 IRIDP-2/BGT/DW-122 Construction of 1No 3.0mx3.0m Culvert at Ch.1050m on Bishnapur UP-Bakerganj bazar Road. ID No. 201083007 16.260 M/S. Munna Enterprise 16.260 09/04/2018 100 20/05/2019
9 IRIDP-2/BGT/MW-114 Maintenance of Dema UP office - Hedayetpur bazar road ( Ch.00m-3207m).ID No. 201083021 3.2070 48.670 M/S. Sohel Construction 48.670 27/02/2018 100 20/05/2019
10 IRIDP-2/BGT/MW-113 Maintenance of Syedpur Madrasha road ( Ch.00m-1283m).ID No. 201085008 1.2830 20.280 SK. Idrish Ali 20.280 12/11/2017 100 20/05/2019
11 IRIDP-2/BGT/MW-112 Maintenance of Kandapara GC(Parnowapara)-Betkhali bazar-Taleswar bazar road( Ch.00m-1000m & 1780m-2485m).ID No. 201084019 1.7050 28.970 M/S. Avanova Enterprise 28.970 30/12/2018 100 20/05/2019
12 IRIDP-2/BGT/MW-111 Maintenance of Karapara UP office - Karapara bazar via Magnitala bazar road ( Ch.00m-870m & 1167m-1994m).ID No. 201083022 1.6970 27.760 M/S. Alif Store 27.760 20/11/2017 100 20/05/2019
13 IRIDP-2/BGT/MW-110 Maintenance of Morga bazar-Bagerhat-Rupsha D.C.Road( Ch.700m-1700m).ID No. 201084034 1.0000 20.780 M/S. Makka Traders 20.780 04/12/2017 100 20/05/2019
14 IRIDP-2/BGT/SDW-98 (a) Improvement of Jattapur Rathkhola_Jattrapur bridge via annodothakur Moinder Road (Ch.00m-1000m.(b) Construction of 1No 0.625mx0.60m Culvert at Ch. 93m on the same road. 1.0000 46.030 M/S. E.M Enterprise 46.030 22/02/2018 100 20/05/2019
15 IRIDP-2/BGT/MW-94 Maintenance of Bottala bazar (Joygaci)-Kachua UP via Taleswar bazar (sadar portion) from Ch. Road (Ch.00m-2472m). 2.4750 44.300 M/S. Alif Store 44.300 08/05/2017 100 20/05/2019
16 IRIDP-2/BGT/MW-93 Maintenance of Rakhalgachi UP-Chulkathi bazar via Ranjeetpur road (Ch. 00m-1000m) 1.0000 15.960 Md. Shariful Alam 15.960 10/12/2017 100 20/05/2019
17 IRIDP-2/BGT/MW-92 Maintenance of Afra-Komorpur CARE Road (Ch. 00m-2500m) 2.5000 46.710 M/S Shovo Enterprise 46.710 05/04/2017 100 20/05/2019
18 IRIDP-2/BGT/DW-69 (a)Improvement of Keshobpur-Chargram-Kondola-Talswar road (Ch.4100m - 5350m). ID No. 201085013(b) Construction of 1No 0.625mx0.60m Culvert at Ch.4950 on the Same Road. 1.2500 56.980 M/S. Bhuiyan Construction 56.980 18/09/2017 100 19/05/2019
19 IRIDP-2/BGT/DW-68 (a)Improvement of Khanpur UP (at polerhat)-Utkul bazar via Sreeghat bazar.road (Ch.4240m - 5905m). ID No. 201083002(b) Construction of 3No 0.625mx0.60m Culvert at Ch.885m,1032m&1170 on the Same Road. 1.6650 102.550 M/S. Habib Enterprise 102.550 29/04/2018 100 19/05/2019
20 IRIDP-2/BGT/DW-43 Improvement of Madrasha Bazar - Bishnupur via Fatapur GPS road (ch.00m-750m). 0.7500 33.480 M/S. Sohel Construction 33.480 02/01/2017 100 19/05/2019
21 IRIDP-2/BGT/MW-41 Maintenance of Paschim Shara BWD-Chaksree road (ch.00m - 2000m). 2.0000 38.210 M/S. Sohel Construction 38.210 11/12/2016 100 19/05/2019
22 IRIDP-2/BGT/MW-40 Maintenance of Mathabhanga R & H-Sukdara bus stand via Sunagar from road (ch.00m-850m). 0.8500 16.700 M/S. Sohel Construction 16.700 31/12/2016 100 19/05/2019
23 IRIDP-2/BGT/DW-15 (a) Improvement of Jattrapur UP-Baroipara bazar via Baghdia Road from Ch. 1650m-2900m. (b) Construction of 3Nos 0.600x0.625m Culvert at Ch. 1670m, 1925m & 2490m on the Same Road. 1.2500 68.500 M/S. Moon Enterprise 68.500 27/10/2016 100 14/05/2019
24 IRIDP-2/BGT/DW-14 (a) Improvement of Hakimpur Pry. School-Chandromahol Road from Ch. 00m-1000m. (b) Construction of 0.600x0.625m Culvert at Ch. 760m on the Same Road. 1.0000 50.540 M/S Jharna Enterprise 50.540 08/08/2016 100 14/05/2019
25 IRIDP-2/BGT/DW-13 (a) Improvement of Bishnapur UP-Bakerganj bazar Road from Ch. 6670m-7670m. (b) Construction of 0.600x0.625m Culvert at Ch. 7513m on the Same Road. 1.0000 79.960 Sardar Jashim 79.960 08/12/2016 100 14/05/2019
26 IRIDP-2/BGT/DW-12 (a) Improvement of West Saera bazar-Sreeghat bazar via sadullahpur Road from Ch. 00m-1000m. (b) Construction of 2Nos 0.600x0.625m Culvert at Ch. 100m & 285m on the Same Road. (c) Construction of 3.00x3.00mCulvert at Ch. 620m on the Same Road. 1.0000 61.910 M/S. Sohel Construction 61.910 08/08/2016 100 14/05/2019
2 Chitalmari
1 IRIDP-2/BGT/DW-4 (a) Improvement of Barabaria- Badamtala-Daluagunia Road from Ch. 1000m-2030m. (b) Construction of 5 Nos 0.625x0.600m Culvert at Ch. 1270m, 1490m, 1755m, 1825m & 2010m on the Same Road. 1.0300 51.910 M/S. F.K Trade Link 51.910 08/08/2016 100 14/05/2019
2 IRIDP-2/BGT/DW-100 Improvement of Doriumajuri more - Doriumajuri Kali Mondir road( Ch.00m-750m).ID No. 201145117 0.7500 59.200 M/S. Alif Store 59.200 01/11/2017 100 14/05/2019
3 IRIDP-2/BGT/DW-99 (a) Improvement of Mollahat-Borabaria-Kananchak Road ( Ch.5556m-6302m).(b) Construction of 1No 0.625mx0.60m Culvert at Ch. 5775m on the Same Road. 0.7370 51.180 MS Deep Bricks 51.180 03/06/2018 100 14/05/2019
4 IRIDP-2/BGT/MW-97 Maintenance of Durgapur RHD-Khaserhat GC-Kaligonj GC-Gazalia GC (CHT. Part) road (Ch.1070m-3710m) 2.6400 94.320 M/S. F.K Trade 94.320 15/07/2017 100 14/05/2019
5 IRIDP-2/BGT/MW-96 Maintenance of Khaserhat - Asoknagar road (Ch.1300m-2300m) 1.0000 17.040 M/S. Reza Enterprise 17.040 07/12/2017 100 13/05/2019
6 IRIDP-2/BGT/DW-53 (a) Improvement of Besharkhola (Bottola) - Bottola Abdul Gazi house road via Sultan Chairman house road (Ch.00m - 750m). ID No. 201145114(b) Construction of 2No 0.625mx0.60m Culvert at Ch.420m& 740m on the Same Road. 0.7500 43.500 M/S. F.K Trade Link 43.500 22/08/2017 100 13/05/2019
7 IRIDP-2/BGT/DW-48 (a) Improvement of Char Chinguri- Jalil Sheikh's House - Kalatala Road Ch. (700m-1494m) (b) Construction of 1 No 0.625x0.600m Culvert at Ch. 991m on the Same Road. 0.7940 38.300 M/S. F.K Trade Link 38.300 08/08/2016 100 13/05/2019
8 IRIDP-2/BGT/DW-6 (a) Improvement of Basbaria-Umajuri Road from Ch. 1337m-1750m. (b) Construction of 1 No 0.625x0.600m Culvert at Ch. 1720m on the Same Road. 0.4130 23.740 M/S Faisal Traders 23.740 08/08/2016 100 13/05/2019
9 RIDP-2/BGT/DW-5 (a) Improvement of Kuraltala-Boalia Road-WDB Embk. Road from Ch. 00m-750m. (b) Construction of 2 Nos 0.625x0.600m Culvert at Ch. 119m & 197m on the Same Road (c) Construction of 1 vent 4.30x3.60m Culvert at Ch. 269m on the Same Road. 0.7500 55.500 M/S. F.K Trade Link 55.500 29/09/2016 100 13/05/2019
10 IRIDP-2/BGT/DW-3 Improvement of Moidah Shibpur Club - Kaligati Road from Ch. 878m-1678m. 0.8000 36.660 M/S. Sohel Construction 36.660 27/08/2016 100 13/05/2019
11 IRIDP-2/BGT/DW-2 (a) Improvement of Shampara-Kudari Via Panchpara Hat Road from Ch. 00m-1000m. (b) Construction of 2 Nos 0.625x0.600m Culvert at Ch. 491m & 626m on the Same Road. (c) Construction of 3 vent 4.00x4.00m Culvert at Ch. 312m on the Same Road. 1.0000 78.070 M/S. F.K Trade Link 78.070 28/09/2016 100 13/05/2019
12 IRIDP-2/BGT/DW-1 (a) Improvement of Bhannabara -Sonakhali Road from Ch. 00m-850m. (b) Construction of 3 Nos 0.625x0.600m Culvert at Ch. 320m, 604m & 763m on the Same Road. 0.8500 44.400 M/S. F.K Trade Link 44.400 28/07/2016 100 13/05/2019
13 IRIDP-2/BGT/DW-5 (a) Improvement of Kuraltala-Boalia Road-WDB Embk. Road from Ch. 00m-750m. (b) Construction of 2 Nos 0.625x0.600m Culvert at Ch. 119m & 197m on the Same Road (c) Construction of 1 vent 4.30x3.60m Culvert at Ch. 269m on the Same Road. 0.7500 55.500 M/S. F.K Trade Link 55.500 100 20/03/2019
3 Fakirhat
1 IRIDP-2/BGT/DW-166 (a)Improvement of Piljong UP-Dhaka-khulna RHD ( Kolomer Dokan) road (Ch.00m- 2800m).ID No. 201344120(b) Construction of 08No 0.60mx0.60m Culvert at Ch.509m, 760m,910m,970m,1059m,1217m,1535m,2770m on the Same Road. 0 0 19,943,877.00 0.00 0 2.8000 199.430 199.430 0 14/05/2019
2 IRIDP-2/BGT/DW-165 (a)Improvement of Khulna- Dhaka RHD(Ziel Tola)-Morolpara- Boiltali Sluice Gate road (Ch.00m- 1620m).ID No. 201344128(b) Construction of 05No 0.60mx0.60m Culvert at Ch.220m, 514m,756m,790m,1220m on the Same Road. 0 0 13,726,908.00 0.00 0 1.6200 137.260 137.260 0 14/05/2019
3 IRIDP-2/BGT/SDW-158 (a)Improvement of Baliadanga Natun mat - Police fari Road (Ch.00m-1116m).ID No. 201344101(b) Construction of 4No 0.60mx0.60m Culvert at Ch.78m,533m,717m&1065m on the Same Road. 1.1160 67.540 M/S Betaga traders 67.540 11/12/2018 100 14/05/2019
4 IRIDP-2/BGT/SDW-156 (a) Improvement of Bailtoly-Lalchandrapur road (Ch.794m-1520m)(b) Construction of 4Nos 0.60mx0.60m Culvert at Ch.874m. 1040m, 1189m, & 13463 on the same road. 0.7260 44.140 M/S. S.S Traders 44.140 15/10/2018 100 14/05/2019
5 IRIDP-2/BGT/SDW-155 (a)Improvement of Bailtoly-Lalchandrapur Road (Ch.00m-794m).ID No. 201344037(b) Construction of 1No 0.60mx0.60m Culvert at Ch.599m on the Same Road.(c) Construction of 1No 2.0mx2.0m Culvert at Ch.375m on the Same Road. 0.7940 50.880 M/S. Mijan Enterprise 50.880 25/10/2018 100 14/05/2019
6 IRIDP-2/BGT/SDW-154 (a)Improvement of Dhaka Khulna RHD ( Balurmat)-Lokhpur GC Road (Ch.2500m-3700m).ID No. 201344099(b) Construction of 2No 0.60mx0.60m Culvert at Ch.2878m&3399m on the Same Road. 1.2000 71.680 M/S. S.S Traders 71.680 15/10/2018 100 14/05/2019
7 IRIDP-2/BGT/SDW-134 (a)Improvement of Dhaka Khulna RHD ( Balurmat)-Lokhpur GC Road (Ch.1500m-2500m).ID No. 201344099(b) Construction of 4No 0.60mx0.60m Culvert at Ch.1653m,1794m,1981m&2450m on the Same Road. 1.0000 63.070 M/S. S.S Traders 63.070 17/10/2018 100 14/05/2019
8 IRIDP-2/BGT/DW-109 (a)Improvement of Shaitsika Village road( Ch.500m-1500m).ID No. 201345030(b) Construction of 3No 0.60mx0.60m Culvert at Ch.515m,815m&1120 on the Same Road. 1.0000 47.380 M/S. M.M Brothers 47.380 02/06/2018 100 14/05/2019
9 IRIDP-2/BGT/DW-107 (a)Improvement of Betaga Village road( Ch.00m-500m).ID No. 201345048(b) Construction of 2No 0.60mx0.60m Culvert at Ch.270m&420 on the Same Road. 0.5000 25.800 M/S. M.M Brothers 25.800 31/05/2018 100 14/05/2019
10 IRIDP-2/BGT/DW-106 (a)Improvement of Nawapara Pry. School-Syambagat road( Ch.00m-1200m).ID No. 201344060(b) Construction of 2No 0.60mx0.60m Culvert at Ch.360m&970 on the Same Road.(c) Construction of 1No 3.50mx3.0m Culvert at Ch.130m on the Same Road. 1.2000 65.850 M/S. M.M Brothers 65.850 18/05/2018 100 14/05/2019
11 IRIDP-2/BGT/DW-59 (a) Improvement of Khthaltala High school to Mokbul sk, house road (Ch.375m - 948m). ID No. 20114095(b) Construction of 3No 0.625mx0.60m Culvert at Ch.405m,510m& 870m on the Same Road. 0.5730 27.660 M/S. Mijan Enterprise 27.660 09/04/2018 100 13/05/2019
12 IRIDP-2/BGT/DW-58 Improvement of Faltita-Kathal bari Rd (Starting from Baniakhali toot Bridge) (Ch: 00-1000m).. ID No. 201344057 1.0000 80.460 M/S. Mizan Enterprise 80.460 27/08/2017 100 13/05/2019
13 IRIDP-2/BGT/DW-57 Improvement of Sattala-Bigai Shool via Nona Pukur road (Ch:1000-2000m). ID No. 201345083 1.0000 50.780 M/S. Mijan Enterprise 50.780 15/10/2017 100 13/05/2019
14 IRIDP-2/BGT/DW-51 (a) Improvement of Betaga - Datneymari via Nicklaypur road (Ch: 00-1203m). (b) Construction of 3Nos 0.600x0.600m Culvert at Ch.228m,828m & 993m on the Same Road. 1.2030 57.490 Md. Shariful Alam 57.490 20/09/2017 100 13/05/2019
15 IRIDP-2/BGT/MW-36 (a) Maintenance of Kuroltala kheyaghat - kalitala road (ch.00m-655m & 1920m- 3550m) (b) Construction of 01No 0.60mx0.60m Culvert at ch.449m on the Same Road. 2.2850 27.570 M/S. Shovo Enterprise 27.570 11/04/2016 100 13/05/2019
16 IRIDP-2/BGT/MW-35 Maintenance of Moubhog - Dohormoubhog road (ch.00m - 2855m) 2.8550 50.690 M/S. Shovo Enterprise 50.690 20/01/2016 100 13/05/2019
17 IRIDP-2/BGT/MW-34 Maintenance of Betaga life sub-centre - H/O Laxmikamti dash road (ch.00m - 2200m) 2.2000 37.390 M/S. Shovo Enterprise 37.390 31/07/2016 100 13/05/2019
18 IRIDP-2/BGT/MW-33 Maintenance of Shibbari - Dhar Moubhog road (ch.00m-1620m). 1.6200 37.510 M/S. Shovo Enterprise 37.510 09/01/2016 100 13/05/2019
19 IRIDP-2/BGT/DW-11 Improvement of Khulna Mollaharhat house building Road from Ch. 640m-823m. 0.1830 10.430 M/S. Mizan Enterprise 10.430 03/08/2016 100 13/05/2019
20 IRIDP-2/BGT/DW-9 (a) Improvement of Naugiabari more RHD-Hosla-Bahirdia UP Road from Ch. 1000m-2100m. (b) Construction of 2Nos 0.600x0.600m Culvert at Ch. 1040m & 1590m on the Same Road. 1.1000 61.230 M/S. Mizan Enterprise 61.230 06/12/2016 100 13/05/2019
4 Kachua
1 IRIDP-2/BGT/DW-132 Construction of 1No 1.0mx2.00m Culvert at Ch.700m on the Kachua-Gazalia road. ID No. 2012382001 7.130 M/S. Tasfia Construction 7.130 26/11/2017 100 20/05/2019
2 IRIDP-2/BGT/SDW-130 a) Improvement of Kachua Upazila Central Eidgah-Shahid Zia RNGPS Via Near The H/O Shahid Bhai Road (Ch.00-236m)b) Construction of 1No 5.0mx3.50m Culvert at Ch.365m on the same road 0.2360 38.150 M/S. Ahamed Steel Industries 38.150 03/01/2019 100 20/05/2019
3 IRIDP-2/BGT/DW-128 a) Improvement of Madertola - Larakul road (Ch.00m-891m & link road 70.00m).b) Construction of 1No 4.50mx3.0m Culvert at Ch. 630 on the Same Road.c) Construction of 1No 0.625mx0.60m Culvert at Ch. 293m on the Same Road. d) Construction of 1No 2.0mx2.0m Culvert at Ch. 403m the Same Road. 0.9610 61.490 M/S. Masud Enterprise 61.490 20/11/2017 100 20/05/2019
4 IRIDP-2/BGT/DW-127 Construction of 1No 5.0mx3.50m Culvert at Ch.500m on Chairkati-Baraikhali school road ID No. 201384077 11.930 M/S. Munna Enterprise 11.930 11/02/2018 100 20/05/2019
5 IRIDP-2/BGT/DW-126 Construction of 1No 4.50mx3.0m Culvert at Ch.1450m on Khalishakhali-Venderkhola-Narandoropur road.ID No. 201384075 10.910 M/S. Munna Enterprise 10.910 20/02/2018 100 20/05/2019
6 IRIDP-2/BGT/DW-125 Improvement of Mogia UP Office-Kathalia Ghat road( Ch.00m-1300m).ID No. 201384058 1.3000 67.180 M/S. Alif Store 67.180 25/10/2017 100 20/05/2019
7 IRIDP-2/BGT/MW-119 Maintenance of Mosni Bazar – Bodhobhumi (Rogudottokati Kali Bari-Nimay Asram )road ( Ch.00m-1500m).ID No. 201384085 1.5000 25.050 M/S. Shawon Enterprise 25.050 15/10/2017 100 20/05/2019
8 IRIDP-2/BGT/MW-118 Maintenance of Mosni Bazar-Bishkhali-Ragudattokati road ( Ch.00m-668m).ID No. 201384073 0.6680 10.640 M/S. Shawon Enterprise 10.640 17/10/2017 100 20/05/2019
9 IRIDP-2/BGT/MW-117 Maintenance of Goalmath - Raripara Palpara road ( Ch.00m-1000m).ID No. 201384004 1.0000 19.630 M/S. Shawon Enterprise 19.630 14/11/2017 100 20/05/2019
10 IRIDP-2/BGT/MW-116 Maintenance of Vasha bazar-Boga bazar road ( Ch.00m-245m).ID No. 201384055 0.2450 6.780 M/S. Shawon Enterprise 6.780 29/10/2017 100 20/05/2019
11 IRIDP-2/BGT/MW-115 Maintenance of Hazrakhali Bazar – Joygaashi Taleshwar road ( Ch.00m-1300m).ID No. 201384120 1.3000 20.940 M/S. Shawon Enterprise 20.940 30/10/2017 100 20/05/2019
12 IRIDP-2/BGT/MW-95 Maintenance of Vasha-Citabari Road (Ch. 00m-1030m) 1.0300 17.760 M/S Shovo Enterprise 17.760 20/04/2017 100 20/05/2019
13 IRIDP-2/BGT/SDW-91 a) Improvement of Padmanagor Bridge - Ejara Padmanagor road (Ch.00m-1807m)b) Construction of 1no 2x4.0mx4.0m Culvert at Ch. 914m on the same on the same road.c) Construction of 1no 4.50mx3.0m Culvert at Ch. 536m on the same on the same road. d) Construction of 2no 0.625mx0.60m Culvert at Ch. 1068m, 1200m on the same on the same road. e) Construction of 1no 2.0mx2.0m Culvert at Ch. 1528m on the same road. 1.8070 115.930 Sardar Jashim 115.930 28/01/2018 100 20/05/2019
14 IRIDP-2/BGT/DW-84 (a) Improvement of Natun hat – bagmara Road ( Ch.00m-1008m).ID No. 201384012(b) Construction of 2No 2.00mx2.00m Culvert at Ch. 10m & 918 on the Same Road.(c) Construction of 1No 0.625mx0.60m Culvert at Ch.275m on the Same Road. 1.0080 87.740 M/S. Alif Store 87.740 05/06/2017 100 20/05/2019
15 IRIDP-2/BGT/DW-76 Construction of 1No 4.50mx3.00m Culvert at Ch.00 on the Kombolpur Road 11.550 M/S. Tasfia Construction 11.550 25/08/2017 100 20/05/2019
16 IRIDP-2/BGT/DW-75 Construction of 1No 4.50mx3.50m Culvert at Ch.00 on the Sonakur-Charsonakur(Bot-tala)Primary School Road. 12.060 M/S. Faruqe Enterprise 12.060 08/01/2017 100 20/05/2019
17 IRIDP-2/BGT/DW-74 Construction of 1No 5.0mx3.50m Culvert at Ch.1000 on the Uttar-GopalpurFWC-Kachua Iron Bridge Road. 12.430 M/S. Bhuiyan Construction 12.430 02/01/2017 100 20/05/2019
18 IRIDP-2/BGT/DW-73 Construction of 1No 4.50mx3.50m Culvert at Ch.950 on the B.Andermanik-S.Club-Kuchibaga-Andermanik H. school Road. 12.060 M/S. Bhuiyan Construction 12.060 12/02/2017 100 20/05/2019
19 IRIDP-2/BGT/DW-72 Construction of 1No 4.50mx3.0m Culvert at Ch.1950 on the Gazalia-Bishar khola Road. 11.550 M/S. Bhuiyan Construction 11.550 26/02/2017 100 20/05/2019
20 IRIDP-2/BGT/DW-71 Improvement of Laraahat-Lararkul road (Ch:290-686m). ID No. 201384045 0.3960 30.760 M/S. Alif Store 30.760 15/06/2017 100 19/05/2019
21 IRIDP-2/BGT/DW-70 (a)Improvement of Madertala-Jobai road (Ch.432m - 972m). ID No. 201384019(b) Construction of 1No 2.0mx2.0m Culvert at Ch.931 on the Same Road.(c) Construction of 1No 0.625mx0.60m Culvert at Ch.832 on the Same Road. 0.5400 43.120 M/S. Alif Store 43.120 19/06/2017 100 19/05/2019
22 IRIDP-2/BGT/SDW-52 Improvement of Shibpur - Chadropara Road Ch. (00m-350m) 0.3500 30.960 M/S Masud Enterprise 30.960 27/02/2017 100 19/05/2019
23 IRIDP-2/BGT/DW-47 (a)Improvement of Kachua UP-Talwshwer bazar road (ch.2461m-3190m). (b) Construction of 01 no 4.50m x 3.50m Culvert at Ch:3474m on the same road (c) Construction of 01 no 0.625m x 0.60m Culvert at Ch:2631m on the same road 0.7290 45.120 M/S Shawon Enterprise 45.120 08/08/2016 100 19/05/2019
24 IRIDP-2/BGT/DW-46 (a)Improvement of Bakultala-Moshni road (ch.800m-1529m). (b) Construction of 01 no 4.50m x 3.50m Culvert at Ch:959m on the same road (c) Construction of 01 no 0.625m x 0.60m Culvert at Ch:1272m on the same road 0.7290 45.130 M/S Shawon Enterprise 45.130 28/11/2016 100 19/05/2019
25 IRIDP-2/BGT/DW-45 Improvement of Fatehpur bazar-Gopalpur UP-Fultala bazar road (ch.5210m-6153m). 0.9430 41.280 M/S Shawon Enterprise 41.280 01/12/2016 100 19/05/2019
26 IRIDP-2/BGT/MW-42 (a)Maintenance of Kachua-Badhal FRB to Tagrakhal river Ghat(Football field) road (ch.1090m - 2430m) (b) Construction of 01 no 2.0m x 2.0m Culvert at Ch:2260m on the same road (c) Construction of 01 no 0.625m x 0.60m Culvert at Ch:2090m on the same road 1.3400 38.830 M/S Shawon Enterprise 38.830 15/11/2016 100 19/05/2019
27 IRIDP-2/BGT/DW-21 Construction of 4.50x3.50m Culvert on Kachua UP-Taleshwer bazar Road at Ch. 5m. 12.130 M/S. Sohel Construction 12.130 08/08/2016 100 19/05/2019
28 IRIDP-2/BGT/DW-20 (a) Improvement of Laraahat-Lararkul Road from Ch. 00m-286m. (b) Construction of 4.50x3.50m Culvert at Ch. 900m on the Same Road. (c) Construction of 0.625x0.600m Culvert at Ch. 150m on the Same Road. 0.2860 27.460 M/S Masud Enterprise 27.460 08/08/2016 100 19/05/2019
29 IRIDP-2/BGT/DW-19 (a) Improvement of Hazrapara-Tulatola Road from Ch. 1100m-1714m. (b) Construction of 4.50x3.50m Culvert at Ch. 1532m on the Same Road. (c) Construction of 0.625x0.600m Culvert at Ch. 1220m on the Same Road. 0.6140 42.440 M/S Masud Enterprise 42.440 04/10/2016 100 14/05/2019
30 IRIDP-2/BGT/DW-18 (a) Improvement of Guzarpara-Baleshsor River Ghat Road from Ch. 00m-558m. (b) Construction of 4.50x3.50mCulvert at Ch. 1000m on the Same Road. (c) Construction of 2Nos 0.625x0.600m Culvert at Ch. 226m & 322m on the Same Road. 0.5580 42.710 Sardar Jashim 42.710 07/12/2016 100 14/05/2019
31 IRIDP-2/BGT/DW-17 (a)Improvement of B.Andermanik-S.Club-Kuchibaga-Andermanik H. school Road from Ch. 00m-274m. (b) Construction of 4.50x3.50m Culvert at Ch. 950m on the Same Road. (c) Construction of 2.00x2.00m Culvert at Ch. 143m on the Same Road. (d) Construction of 0.625x0.600m Culvert at Ch. 744m on the Same Road. 0.2740 30.430 M/S Masud Enterprise 30.430 08/06/2016 100 14/05/2019
32 IRIDP-2/BGT/DW-16 (a) Improvement of Maliporton school-Bishkhali Road from Ch. 00m-408m. (b) Construction of 2.00x2.00m Culvert at Ch. 800m on the Same Road. 0.4080 23.540 M/S Masud Enterprise 23.540 07/06/2016 100 14/05/2019
5 Mollahat
1 RIDP-2/BGT/DW-103 (a)Improvement of Rajpat Chairmanbari – Bishowroad road( Ch.00m-560m).ID No. 201565104(b) Construction of 1No 0.625mx0.60m Culvert at Ch.540m on the Same Road. 0.5600 28.460 M/S. Monir Traders 28.460 02/06/2018 60 14/05/2019
2 IRIDP-2/BGT/DW-101 (a)Improvement of Gatbila Bridge-Rajpat Bil road( Ch.00m-1250m).ID No. 201564030(b) Construction of 1No 0.625mx0.60m Culvert at Ch.100m on the Same Road. 1.2500 57.430 M/S. Monir Traders 57.430 02/06/2018 30 14/05/2019
3 IRIDP-2/BGT/DW-56 Improvement of Rahmotpara-Panipara road (Ch.00m - 1000m). ID No. 201564056 1.0000 45.770 S.M Nurul Islam 45.770 31/07/2018 60 14/05/2019
4 IRIDP-2/BGT/DW-55 Improvement of Burigangni Kalam Kazi- house- Abdul Fakir house road (Ch.00m - 1000m). ID No. 201565093 1.0000 45.770 S.M Nurul Islam 45.770 31/07/2018 60 14/05/2019
5 IRIDP-2/BGT/SDW-153 Construction of 01No 2x4.5mx3.0m Culvert at Ch.4090m on Kodalia U.P Office - Aruadehi hat Road.ID No. 201563004 9.0000 17.320 M/S. Bhai Bhai Enterprise 17.320 05/03/2018 100 14/05/2019
6 IRIDP-2/BGT/SDW-129 Improvement of Approch road to Laila Azad College from Old Khulna – Dhaka road (Ch.00m-270m).ID No. 201565106 &link T&T Office from Bridge poinr – College Campaus240m& Along bank of Nalua Khal 190.0m 0.5100 41.960 M/S. Khan Enterprise 41.960 07/03/2018 100 14/05/2019
7 IRIDP-2/BGT/DW-108 (a)Improvement of Ghanashampur-Bashbaria village road( Ch.00m-1000m).ID No. 201344092(b) Construction of 2No 0.60mx0.60m Culvert at Ch.62m&120 on the Same Road. 1.0000 49.400 M/S. M.M Brothers 49.400 21/06/2018 100 14/05/2019
8 IRIDP-2/BGT/DW-105 (a)Improvement of H/o Tofazzel Molla to H/o Monirul Molla at aruakandiroad( Ch.00m-860m).ID No. 201565077(b) Construction of 1No 0.60mx1.125m Culvert at Ch.395 on the Same Road.c) Construction of 2No 0.625mx0.60m Culvert at Ch.549m & 590m on the same road 0.8600 41.750 MS Deep Bricks 41.750 12/12/2017 100 14/05/2019
9 RIDP-2/BGT/DW-104 (a)Improvement of Atjuri UP-Kadamtala Kheyaghat road( Ch.1287m-2800m).ID No. 201564016(b) Construction of 3No 0.60mx1.125m Culvert at Ch.1352m,1810m& 2465 on the Same Road.(c) Construction of 2No 0.625mx0.60m Culvert at Ch.2535m& 2773m on the Same Road. 1.5130 86.410 M/S. Kamrul & Brothers 86.410 20/12/2018 100 14/05/2019
10 IRIDP-2/BGT/DW-102 Improvement of Garfa-Girishnagar-Kadamtala Khayaghat road( Ch.00m-1610m).ID No. 201564047 1.6100 46.220 M/S. Khan Enterprise 46.220 04/01/2018 100 14/05/2019
11 IRIDP-2/BGT/DW-54 Improvement of Kachna wapda-Sukur daria house road (Ch.00m - 1000m). ID No. 201564099 1.0000 45.770 M/S. Molla Enterprise 45.770 28/08/2017 100 13/05/2019
12 IRIDP-2/BGT/DW-50 (a)Improvement of Dabra-Madartala - Dabra govt.pry.school road (Ch. 00m-1020.50m) (b) Construction of 1 No 0.60x0.75m Culvert at Ch.300m on the Same Road. 1.0200 48.120 M/S Iqbal & Brothers 48.120 19/05/2017 100 13/05/2019
13 IRIDP-2/BGT/DW-49 Improvement of Sarospur Road (Ch. 1200m-2060.5m) 0.8600 47.760 M/S. S.S. Brothers 47.760 27/03/2017 100 13/05/2019
14 IRIDP-2/BGT/DW-10 (a) Improvement of Sambagat R&H-Jaria Mitkumra Shardar house mosque Road by BC from Ch. 00m-1000m. (b) Construction of 3Nos 0.600x0.600m Culvert at Ch. 200m, 300m & 350m on the Same Road. 1.0000 47.170 M/S. Mizan Enterprise 47.170 02/02/2017 100 13/05/2019
15 IRIDP-2/BGT/DW-8 (a) Improvement of Mollahat Nalua UZR-Aruadehi parchim para govt.pry.school Road by BC from Ch. 00m-1106m. (b) Construction of 0.600x0.750m Culvert at Ch. 350m on the Same Road. 1.1060 50.000 M/S. Mizan Enterprise 50.000 05/11/2016 100 13/05/2019
16 IRIDP-2/BGT/DW-7 (a)Improvement of Shason Sobed Molla house – Jamai more Road from Ch. 00m-1000m. (b) Construction of 2 Nos 0.60x0.75m Culvert at Ch.300m&900m on the Same Road. 1.0000 50.000 Shikder Zahidul Islam 50.000 15/01/2017 100 13/05/2019
6 Mongla
1 IRIDP-2/BGT/DW-149 (a)Improvement of Haldibunia-Dasherkhando road (Ch.00m-1750m).ID No. 201584050(b) Construction of 05No 1.0mx1.0m Culvert at Ch.142m,175m,1100m,1326m &1415m on the Same Road. 1.7500 99.000 M/S. Iqbal Enterprise 99.000 18/10/2018 100 21/05/2019
2 IRIDP-2/BGT/DW-150 Improvement of Chandpai UP-Chila hat road (Ch.00m-250m).ID No. 201583001 0 0.2500 2091.000 M/S. Bhai Bhai Enterprise 2091.000 06/10/2018 100 21/05/2019
3 IRIDP-2/BGT/DW-90 (a) Improvement of Digraj bazar - Madurpalta Govt. Pond Road. ( Ch.00m-1307m).ID No. 201584094(b) Construction of 2No 1.0mx1.0m Culvert at Ch. 105m&135m on the Same Road. 1.3070 57.390 57.390 26/06/2017 100 21/05/2019
4 IRIDP-2/BGT/DW-89 (a) Improvement of Mongla - Chatterhat GC at Tatibunia --Burburia School..Road ( Ch.00m-3200m).ID No. 201584017(b) Construction of 4No 1.0mx1.0m Culvert at Ch. 2395m,2550m,2600m&2825m on the Same Road. 3.2000 131.360 M/S. Bhai Bhai Enterprise 131.360 20/03/2018 100 21/05/2019
5 IRIDP-2/BGT/DW-63 (a) Improvement of Shabermet (Vogomaner more) – Lakhmikhali (shadhur bare) road (Ch:00-1700m). ID No. 201584039(b) Construction of 3No 1.0mx1.0m Culvert at Ch.10m,549m,718m & 01 no 2.0mx 2.0 m Culvert at Ch.1620m on the Same Road. 1.7000 117.010 M/S. Mohiuddin Ahmed 117.010 31/12/2017 100 21/05/2019
6 IRIDP-2/BGT/DW-37 (a) Improvement of Digiraj – Jhalmalia dhigi via Burirdanga union parishad road (Ch.2500m - 4040m). (b) Construction of 1No 1.0mx1.0m Culvert at Ch.3390m on the Same Road. 1.5400 117.620 M/S. Shovo Enterprise 117.620 30/12/2017 100 21/05/2019
7 IRIDP-2/BGT/DW-25 (a) Improvement of Holdibunia (Baliar more) - Burburia via Malgazi-Hid office Road from Ch. 755m-1365m. (b) Construction of 3 Nos 1.00x1.00m Culvert at Ch. 965m, 1083m & 1337m on the Same Road. 0.6100 32.100 M/S A.R. Enterprise 32.100 13/10/2016 100 21/05/2019
8 IRIDP-2/BGT/DW-24 (a) Improvement of Sundarban UP - Madurpalta Bazar Road from Ch. 1900m-3000m. (b) Construction of 4 Nos 1.00x1.00m Culvert at Ch. 1600m, 1915m, 2105m & 2 240m on the Same Road. 1.1000 49.090 M/S. Sohel Construction 49.090 08/08/2016 100 20/05/2019
7 Morrelganj
1 IRIDP-2/BGT/DW-66 (a) Improvement of Nurullahpur at Sardar Bari-Keshorampur GPS Road (ch.00m-1360m)ID No. 201605038(b) Construction of 2No 1.60mx1.60m Culvert at Ch.200m & 1500m on the Same Road. 1.3600 67.290 Sardar Jashim 67.290 30/12/2017 100 22/05/2019
2 IRIDP-2/BGT/DW-65 (a) Improvement of East Chandripur Badsha Mia Shop-Dakuar Khal bridge via Ramchandrapur Bazar Road (ch.1500m-2863m)ID No. 201605050(b) Construction of 2No 0.625mx0.60m Culvert at Ch.1635m & 2026m on the Same Road. 1.3630 13.470 M/S. Masum Billah Enterprise 13.470 11/04/2019 100 22/05/2019
3 IRIDP-2/BGT/SDW-39 Improvement of Shrenikhali (Munshir hat) – Sonakhali bazar road (Ch.2200m - 2900m). IDNo.201604161 0.7000 18.890 M/S Monir Bricks Enterprise 18.890 10/11/2016 100 22/05/2019
4 IRIDP-2/BGT/DW-38 Improvement of Herma Mondal bari Aurjon bahor Shimna road (Ch.00m - 2500m). IDNo.201605160 2.5000 85.970 M/S. S.S. Brothers 85.970 24/08/2016 100 22/05/2019
5 IRIDP-2/BGT/DW-30 Improvement of Amtoli Madrasa - Wapda Embankment via South Kumarkhali RNGPS Road from Ch. 850m-3000m. 2.1500 48.790 M/S. Chan Enterprise 48.790 08/08/2016 100 22/05/2019
6 IRIDP-2/BGT/DW-29 Improvement of Chingrakhali GC - Daibajnahati GC Road from Ch. 2794m-6734m & 9200m-9420m. 4.1600 226.620 M/S Jharna Enterprise 226.620 09/04/2018 100 22/05/2019
7 IRIDP-2/BGT/DW-28 (a) Improvement of Pollerhat GC - Chingrakhali UP-Zianagar RHD (Morel Part) (UP to UP Office) Road from Ch. 3629m-4110m & 5143m-5662m. (b) Construction of Single vent 4.0x4.0m Culvert at Ch. 1750m on the Same Road. (c) Construction of 4Nos 0.625x0.600m Culvert at Ch. 950m, 2370m, 2700m & 3250m on the Same Road. 1.0000 5091.000 M/S. Moon Enterprise 5091.000 30/08/2017 100 22/05/2019
8 IRIDP-2/BGT/DW-27 (a) Improvement of Balvhadrapur RHD - Bishkhali GPS Road from Ch. 00m-1170m. (b) Construction of 1No 1.60x1.60m Culvert at Ch. 760m on the Same Road. (c) Construction of 2Nos 4.00x4.0m Culvert at Ch. 157m & 1174m on the Same Road. 1.1700 86.240 M/S Shahadat Enterprise 86.240 25/09/2016 100 21/05/2019
9 IRIDP-2/BGT/DW-26 (a) Improvement of Putikhali U.P - Panchakaran UP via Gazalia bazar from Ch. 3100m-5160m.&5480m-5500m. (b) Construction of 2Nos 0.90x0.90m Culvert at Ch. 4475m & 5225m on the Same Road. 2.0800 81.350 M/S. S.S. Brothers 81.350 07/08/2016 100 21/05/2019
8 Rampal
1 IRIDP-2/BGT/DW-159 (a)Improvement of H/O Aziz Chowkider at Madardia - Hular WAPDA road (Ch.00m- 900m).ID No. 201734157(b) Construction of 01No 3.0mx3.0m Culvert at Ch.480m on the Same Road. 0 0.9000 49.960 M/S. Jhorna Enterprise 49.960 0 21/05/2019
2 IRIDP-2/BGT/DW-146 (a)Improvement of Gilatala bazar G.C-Kaligonj bazar via Bashtali road (Ch.00m-2210m).ID No. 201734076b) Construction of 02No 0.625mx0.60m Culvert at Ch.1600m &1950m on the Same Road. 2.2100 146.390 G.B.C. International 146.390 04/05/2019 40 21/05/2019
3 IRIDP-2/BGT/DW-144 Improvement of Telikhali Govt. Pry. School house of Liakot Member road (Ch.2250m-3300m).ID No. 201734116 1.0500 55.630 M/S. Mijan Enterprise 55.630 0 21/05/2019
4 IRIDP-2/BGT/DW-141 (a)Improvement of Bhojpatia Uttar Para Road (Ch.00m-750m).ID No. 201735016b) Construction of 01No 0.625mx0.60m Culvert at Ch.650m on the Same Road. 0.7500 38.420 Abul Kalam Azad 38.420 31/12/2019 25 21/05/2019
5 IRIDP-2/BGT/DW-140 Improvement of Foyla Bazar Kundo Para moar - Biman Bondor road (Ch.610m-875m).ID No. 201735124 0.2650 11.780 M/S. Molla Enterprise 11.780 14/11/2018 40 21/05/2019
6 IRIDP-2/BGT/DW-60 Improvement of Srifaltala new market – Veternary hospital via sarner field road (Ch.00m - 1900m). ID No. 201734139 1.9000 146.560 M/S. Himel Enterprise 146.560 0 21/05/2019
7 IRIDP-2/BGT/DW-87 Improvement of Mongla-Mithakhali-Mollikerber Road (Rampal portion)Road ( Ch.7055m-8250m).ID No. 201732009 1.1950 57.080 M/S. Amirun Enterprise 57.080 19/12/2018 100 21/05/2019
8 IRIDP-2/BGT/DW-148 Improvement of Kundopara Durga Mondir- Shreefaltola Bottola road (Ch.00m-660m).ID No. 201735070 0.6440 46.200 M/S Khandakar Brothers 46.200 10/04/2019 100 21/05/2019
9 IRIDP-2/BGT/DW-147 Improvement of Gilatale G.C-Bhospatia UP road (Ch.00m-122m).ID No. 201733002 0.1220 21.530 M/S. Shovo Enterprise 21.530 10/11/2018 100 21/05/2019
10 IRIDP-2/BGT/DW-145 (a)Improvement of Vaga Betkata Kali Mondir- Babu Pa Hous via Betkata Hori Mondir road (Ch.00m-775m).ID No. 201735139(b) Construction of 01No 0.625mx0.60m Culvert at Ch.700m on the Same Road. 0.7750 34.530 M/S. Shovo Enterprise 34.530 12/03/2018 100 21/05/2019
11 IRIDP-2/BGT/DW-143 Improvement of Foyla hat-Chaksree GC road (Ch.00m-870m).ID No. 201732004 0.8700 19.370 M/S. Shovo Enterprise 19.370 15/03/2018 100 21/05/2019
12 IRIDP-2/BGT/DW-142 Improvement of Sakurhat zame mosque -Saguna uttaarpara mondir road (Ch.1054m-1640m).ID No. 201734028 0.5860 42.600 M/S. Shovo Enterprise 42.600 15/03/2018 100 21/05/2019
13 IRIDP-2/BGT/DW-139 (a)Improvement of Horishova Mondir - Bedan babu House (Orabunia) road (Ch.00m-450m).ID No. 201735188b) Construction of 01No 0.625mx0.60m Culvert at Ch.700m on the Same Road. 0.4500 16.070 M/S. Sohel Enterprise 16.070 20/11/2018 100 21/05/2019
14 IRIDP-2/BGT/DW-138 (a)Improvement of Tangramari-Garer KhalRoad (Ch.260m-1500m).ID No. 201734112(b) Construction of 02No 0.625mx0.60m Culvert at Ch.900m&1110m on the Same Road. 1.2400 68.310 M/S. Shovo Enterprise 68.310 06/05/2018 100 21/05/2019
15 IRIDP-2/BGT/DW-137 Improvement of Dhakin Mallikerber Khayghat-Daliprara Road (Ch.00m-390m).ID No. 201734088 0.3900 11.210 M/S. Bebakanandho Enterprise 11.210 05/12/2018 100 21/05/2019
16 IRIDP-2/BGT/DW-136 Improvement of Mollikerber Mosque - Montu Tallukder House Road (Ch.00m-398m).ID No. 201735101 0.3980 38.390 M/S. Jhorna Enterprise 38.390 28/11/2018 100 21/05/2019
17 IRIDP-2/BGT/DW-135 Improvement of Rajnagor UP via Rajnagor Junior High School-Chalkgona Kheyaghat Road (Ch.2450m-3500m).ID No. 201734037 1.0500 44.940 M/S. Alif Traders 44.940 20/03/2019 100 21/05/2019
18 IRIDP-2/BGT/DW-88 (a) Improvement of Bujbunia bazar-Sonakur bazar G.C.R.Road ( Ch.00m-1600m).ID No. 201734067b) Construction of 1 No 0.625mx0.600m Culvert at ch. 262m on the Same Road. 1.6000 51.970 M/S. Amirun Enterprise 51.970 24/11/2017 100 21/05/2019
19 IRIDP-2/BGT/DW-86 Improvement of Telikhali-Baruipara Road ( Ch.1150m-3300m).ID No. 201734032 & Link 342.0m 2.4920 85.640 M/S. Bhai Bhai Enterprise 85.640 10/12/2017 100 21/05/2019
20 IRIDP-2/BGT/DW-85 Improvement of Pipulbunia-Kalakher Ber Westpara Road ( Ch.1020m-2670m).ID No. 201734001 1.6500 57.020 M/S. Amirun Enterprise 57.020 05/03/2019 100 21/05/2019
21 IRIDP-2/BGT/DW-62 Improvement of Sarafput – Durgapur – Khayaghat road (Ch.1310m - 1975m). ID No. 201734074 0.6650 31.650 M/S. Habib Enterprise 31.650 30/12/2017 100 21/05/2019
22 IRIDP-2/BGT/DW-61 Improvement of Maderdia GPS – Lunch ghat road (Ch.00m - 520m). ID No. 201735086 0.5200 27.720 M/S. Habib Enterprise 27.720 28/12/2017 100 21/05/2019
23 IRIDP-2/BGT/DW-23 (a) Improvement of Gilatale G.C - Bhospatia UP Road from Ch. 5930m-8955m. (b) Construction of 1 vent 4.00x4.00m RCC Box Culvert at Ch. 6125m on the Same Road. (c) Construction of 2 vent 4.00x4.00m RCC Box Culvert at Ch. 6500m on the Same Road. 3.0250 19.710 M/S Jharna Enterprise 19.710 09/06/2018 100 20/05/2019
24 IRIDP-2/BGT/DW-22 Improvement of Tatulia bridge - Kadirkhola Road from Ch. 2835m-4485m. 1.6500 119.580 M/S. Habib Enterprise 119.580 30/11/2017 100 20/05/2019
9 Sharankhola
1 IRIDP-2/BGT/DW-32 a) Improvement of Baniakhali GC - Pollanbari R&H (Sharankhola Part) Road from Ch. 2945m-3500m. (b) Construction of 3Nos 0.625x0.600m Culvert at Ch. 2982m, 3225m & 3315m on the Same Road. 0.5550 16.900 M/S. Shovo Enterprise 16.900 08/08/2016 100 22/05/2019
2 IRIDP-2/BGT/DW-31 Improvement of Uttar Badhal - Pallanbari Road from Ch. 723m-1098m. 0.3750 9.280 M/S. Habib Enterprise 9.280 08/08/2016 100 22/05/2019
Total : 166.9030 (Km) 14364.13 (Lac) 14364.13 (Lac)