Project Scheme Detail List
SL No. Package No. Name Length (Km) Allotment (Lac) Name of Contractor Contract Amount (Lac) Date of Commencement Date of Completion Physical Progress (%) Date of Progress Update Remarks
1 Gangachara
1 IRIDP-2/RNG/DW-13 a) Improvement of Almarbazer to Totar more (Ch.00-1000) m. b) Construction of 1nos 0.625m x0.600m U Drain culvert at ch. 535m on the same road. 15-Feb-16 1.0000 58.620 Md. Khairul Kabir Rana 58.620 30/05/2017 100 02/04/2019
2 IRIDP-2/RNG/DW-12 a) Improvement of W/S Kaliamin Mosque-Moniram Mosque (Ch. 00-1000m). b) Construction of 1nos 0.625m x0.600m U Drain culvert at ch. 60m on the same road. 16-Feb-16 1.0000 51.480 Md. Abdul Malek 51.480 20/09/2016 100 02/04/2019
3 IRIDP-2/RNG/DW-11 Improvement of Khalifar Bazar-Hazirbazar (Ch.1000-3000m). 2.0000 105.340 Md.Hafijur Rahaman 105.340 12/05/2016 100 02/04/2019
4 IRIDP-2/RNG/DW-15 a) Improvement of Chandaner hat –Khilalgonj Bazar Ch.00-4000m. b) Construction of 2nos 0.625m x0.600m U Drain culvert at ch. 1610m & 1850m on the same road. 4.0000 197.600 Md. Abdul Malek 197.600 100 20/03/2019
5 IRIDP-2/RNG/DW-14 a) Improvement of Kolkond VGD godoun to Gongachara Kachua FRB Ch. 00-1000 m. b) Construction of 1nos 0.625m x0.600m U Drain culvert at ch. 215m on the same road. 1.0000 53.880 Md. Abdul Malek 53.880 100 20/03/2019
Total : 9.0000 (Km) 466.92 (Lac) 466.92 (Lac)