1
|
IRIDP-2/RNG/DW-13
|
a) Improvement of Almarbazer to Totar more (Ch.00-1000) m. b) Construction of 1nos 0.625m x0.600m U Drain culvert at ch. 535m on the same road. 15-Feb-16
|
1.0000
|
58.620
|
Md. Khairul Kabir Rana
|
58.620
|
|
30/05/2017
|
100
|
02/04/2019
|
|
2
|
IRIDP-2/RNG/DW-12
|
a) Improvement of W/S Kaliamin Mosque-Moniram Mosque (Ch. 00-1000m). b) Construction of 1nos 0.625m x0.600m U Drain culvert at ch. 60m on the same road. 16-Feb-16
|
1.0000
|
51.480
|
Md. Abdul Malek
|
51.480
|
|
20/09/2016
|
100
|
02/04/2019
|
|
3
|
IRIDP-2/RNG/DW-11
|
Improvement of Khalifar Bazar-Hazirbazar (Ch.1000-3000m).
|
2.0000
|
105.340
|
Md.Hafijur Rahaman
|
105.340
|
|
12/05/2016
|
100
|
02/04/2019
|
|
4
|
IRIDP-2/RNG/DW-15
|
a) Improvement of Chandaner hat –Khilalgonj Bazar Ch.00-4000m. b) Construction of 2nos 0.625m x0.600m U Drain culvert at ch. 1610m & 1850m on the same road.
|
4.0000
|
197.600
|
Md. Abdul Malek
|
197.600
|
|
|
100
|
20/03/2019
|
|
5
|
IRIDP-2/RNG/DW-14
|
a) Improvement of Kolkond VGD godoun to Gongachara Kachua FRB Ch. 00-1000 m. b) Construction of 1nos 0.625m x0.600m U Drain culvert at ch. 215m on the same road.
|
1.0000
|
53.880
|
Md. Abdul Malek
|
53.880
|
|
|
100
|
20/03/2019
|
|